NOTICE OF REGULAR MEETING - Encina Wastewater Authority
-
Upload
khangminh22 -
Category
Documents
-
view
4 -
download
0
Transcript of NOTICE OF REGULAR MEETING - Encina Wastewater Authority
N O T I C E O F R E G U L A R M E E T I N G
E N C I N A W A S T E W A T E R A U T H O R I T Y
B O A R D O F D I R E C T O R S
WEDNESDAY, JULY 22, 2020
8:00 A.M.
Teleconference Meeting
Ref: Admin. 20‐14169
The next regular meeting of the Encina Wastewater Authority Board of Directors is scheduled for 8:00
A.M. on Wednesday, July 22, 2020. Requests for disability‐related accommodations to assist or
enable any person with a disability to participate in this meeting, or requests for agenda materials
relating to this meeting, should be directed to Michael Steinlicht, General Manager.
______________________________________
Michael Steinlicht
General Manager
(760) 438‐3941
Scheduled Upcoming Meetings
All meetings will be held telephonically unless otherwise noted.
POLICY & FINANCE COMMITTEE – Tuesday, August 11, 2020 at 10:00 A.M.
CAPITAL IMPROVEMENT COMMITTEE – Wednesday, August 19, 2020 at 7:30 A.M.
REGULAR EWA BOARD OF DIRECTORS – Wednesday, August 26, 2020 at 8:00 A.M.
Ref: Admin.20-14170
A G E N D A
E N C I N A W A S T E W A T E R A U T H O R I T Y
B O A R D O F D I R E C T O R S
DATE: July 22, 2020 MEETING TIME: 8:00 A.M. Deadline to Request for Public Comment: 7:30 A.M. Public Dial-In Number: (888) 788-0099 Conference ID: 991 6114 6078
The Encina Wastewater Authority Mission Statement: “As an environmental leader, EWA provides reliable and fiscally responsible wastewater services to the
communities we serve while optimizing the use of renewable resources.”
A G E N D A
Telephonic Participation by the Public. In light of the COVID-19 Pandemic and under the direction of Governor Newsom’s Executive Order N-29-20, all EWA Board and Committee public meetings shall only be accessible to members of the public telephonically. All members of the public wishing to observe the public meeting must dial in to the telephone number indicated above, and when prompted, use the Conference ID identified above. Please note all members of the public shall be muted by the EWA telephone conference coordinator (the “Coordinator”) in order to minimize disruption and background noise. Members of the public that wish to do so may address the Board of Directors via the telephone conference for up to 3 minutes on any item; anyone wishing to address the Board of Directors must submit an email to [email protected] with the subject line “Request to Address Board of Directors” by no later than 7:30 A.M. the day of the meeting. In the email, please include your name, the item you wish to speak about, and the telephone number that you will be calling from so that the Coordinator can un-mute your line when you are called upon to speak. Alternatively, you can call Joseph Spence at (760) 268-8820 by no later than 7:30 A.M. and request an opportunity to address the Board of Directors during public comment. Those making public comment requests via phone will be asked to provide your name, the item you wish to speak about, and the telephone number that you will be calling from so that the Coordinator can un-mute your line when you are called upon to speak. Once the public meeting has commenced, the Chair will invite you to speak and ask the Coordinator to un-mute your line at the appropriate time.
Persons with disabilities that require modifications or accommodations should email [email protected] or call (760) 268-8820 by no later than 7:30 A.M. to request reasonable modifications or accommodations consistent with the Americans with Disabilities Act and EWA shall promptly work with you to resolve the matter in favor of accessibility.
In the case of an emergency, items may be added to the agenda by a majority vote of the Board of Directors. An emergency is defined as a work stoppage; a crippling disaster; or other activity, which severely imperils public health, safety, or both. Also, items that arise after the posting of the agenda may be added by a two-thirds vote of the Board of Directors.
Encina Wastewater Authority Board of Directors
July 22, 2020
ii Ref: Admin.20-14170
1. Call to Order
2. Director Mosca will lead the Pledge of Allegiance
3. General Public Comment Period
4. Approval of Agenda
5. Presentation and Awards
• Mr. Gabriel Mendez for selection as EWA’s Employee of the Quarter for the 2nd quarter of the 2020 calendar year.
~~~ C O N S E N T C A L E N D A R ~~~
Items 6-15 will be enacted in one motion in accordance with the recommendation unless removed from the Consent Calendar by the Board of Directors, Staff or Public. If a member of the public wishes to remove an item, they should submit a “Request to Address JAC/EWA Board of Directors” form to the Board Secretary prior to the meeting. Items removed from the Consent Calendar will be considered in the original agenda order immediately following adoption of the Consent Calendar.
6. Minutes of June 24, 2020 Attachment Page 6
The minutes are the permanent record of the Encina Wastewater Authority Board of Directors meeting held on June 24, 2020.
Recommendation:
Approve the June 24, 2020 EWA Board of Directors Meeting Minutes.
Staff Reference: Michael Steinlicht, General Manager
7. Operations Report for June 2020 Attachment Page 7
This report summarizes EWA’s permit status, public relations activities, and safety record for June 2020.
Recommendation:
Receive and file the EWA Operations Report for June 2020.
Staff Reference: Octavio Navarrete, Director of Operations
8. EWA Monthly Flow and Capacity Management Report for June 2020 Attachment Page 8
This report summarizes member agency wastewater flows during June 2020.
Recommendation:
Receive and File the EWA Monthly Flow and Capacity Management Report for June 2020.
Staff Reference: Doug Campbell, Director of Environmental Compliance
Encina Wastewater Authority Board of Directors
July 22, 2020
iii Ref: Admin.20-14170
9. Approval of Demands for June 2020 Attachment Page 9
This item provides for Board of Directors approval of all demands paid from EWA’s Treasury during the month of June 2020.
Recommendation:
Approve checks and electronic payments for June 2020.
Staff Reference: LeeAnn Warchol, Treasurer/Auditor
10. Treasurer’s Cash and Investment Report for June 2020 Attachment Page 10
This report discloses EWA’s cash and investments as of the prior month’s end.
Recommendation:
Receive and file the Treasurer’s Cash and Investment Report for June 2020.
Staff Reference: LeeAnn Warchol, Treasurer/Auditor
11. Fiscal Year-to-Date Operating Budget Performance Report for June 2020
No Attachment
This report is deferred to the August 2020 Board of Directors meeting.
Recommendation: None
Staff Reference: LeeAnn Warchol, Treasurer/Auditor
12. June 2020 Tactical Plan Status Report Attachment Page 12
The 2020 Tactical Plan describes specific activities staff will undertake during the calendar year in support of the EWA Board of Directors approved 2018-2023 Five Year Strategic Business Plan. The Tactical Plan consists of forty-five (45) tactical goals distributed through eight (8) Strategic Initiatives and serves as the performance evaluation basis for the General Manager and staff. This report summarizes staff’s progress toward completing the program objectives specified in the 2020 Tactical Plan.
Recommendation:
Receive and file the June 2020 Tactical Plan Status Report.
Staff Reference: Michael Steinlicht, General Manager
Encina Wastewater Authority Board of Directors
July 22, 2020
iv Ref: Admin.20-14170
13. Auditors’ Communication with Those Charged with Governance Attachment Page 13
Section 13.1.9 of the Revised Basic Agreement requires the preparation of an annual independent audit of EWA’s financial statements. Section 2.9.2 of the Revised Establishment Document requires EWA’s annual independent audit to conform to requirements established for special districts by the State Controller and generally accepted accounting principles (GAAP). Statements on Auditing Standards (SAS) are promulgated by the Auditing Standards Board of the American Institute of Certified Public Accountants and provide guidance to independent auditors on GAAP. SAS No. 114 establishes standards for the Independent Auditors’ Communication with Those Charged with Governance in relation to an audit of financial statements. The Board of Directors is charged with governance in relation to EWA’s annual independent audit.
Recommendation:
Receive and file the Independent Auditors’ Communication in relation to the annual audit of EWA’s financial statements.
Staff Reference: Michael Steinlicht, General Manager
14. FY 2022 E-CAMP Update Award Attachment Page 14
Established in 1993, the Encina Comprehensive Asset Management Plan (E-CAMP) is a planning tool that is updated every two years to cost effectively manage assets over their full life cycle by planning and prioritizing asset rehabilitation and replacement for the Encina Water Pollution Control Facility (EWPCF). A new E-CAMP update is needed to prepare for the FY 2022 budgeting effort. On March 22, 2017, the Board of Directors authorized the General Manager to execute a professional services agreement with Kennedy/Jenks Consultants (K/J) for the FY 2018 E-CAMP Update, with the option to extend those services for additional years for additional E-CAMP efforts. Based on K/J’s ability to effectively complete the effort, staff recommends K/J continue to be utilized for the FY 2022 E-CAMP. This authorization exceeds the General Manager’s authority and therefore requires Board approval.
Recommendation:
Authorize the General Manager to execute a Professional Services Agreement with Kennedy/Jenks Consultants (K/J) in the amount not to exceed $149,985 for Engineering Services for the FY 2022 E-CAMP Update.
Staff Reference: Michael Steinlicht, General Manager
Encina Wastewater Authority Board of Directors
July 22, 2020
v Ref: Admin.20-14170
15. FY 2021 Annual SCADA Support Services Attachment Page 15
Encina Wastewater Authority’s (EWA) Supervisory Control and Data Acquisition (SCADA) System is a critical asset that monitors, controls, and collects critical data necessary for the operation of the wastewater treatment process. Like any other critical asset and piece of technology, SCADA requires routine maintenance and minor upgrades to sustain system performance. In October 2017, the Board awarded an As-Needed Professional Services Agreement to Enterprise Automation (EA) for programmatic SCADA systems integration and support. Under this effort, EA will provide SCADA integration and support services for that routine maintenance and upkeep. The recommendation exceeds the General Manger’s authority and therefore requires Board of Directors’ approval.
Recommendation:
Authorize the General Manager to award a Task Order to Enterprise Automation (EA) in the amount of $160,007 for FY 2021 Annual SCADA Support Services.
Staff Reference: Michael Steinlicht, General Manager
~~~END OF CONSENT CALENDAR~~~
~~~BOARD OF DIRECTORS ACTION ITEMS ~~~
16. Resolution 2020-04 Appropriating Funds for Fiscal Year 2021 Pension Policy, Operating and Capital Program Budgets and Establishing Controls Thereon
Attachment Page 16
On April 22, 2020, the Board of Directors approved the Fiscal Year 2021 Pension Policy, Operating and Capital Program Budgets and forwarded said budgets to the Encina Joint Advisory Committee which recommended that the Boards and Councils of the Encina Member Agencies approve the budgets. Each of the Member Agencies has approved the budgets in conformance with Section 13.1.2 of the Revised Basic Agreement (Attachment 3). Adoption of the proposed resolution (Attachment 2) will appropriate and authorize expenditure of $4,096,100 in pension policy funds, $19,173,359 in operating funds and $24,249,023 in capital funds for the fiscal year ending June 30, 2021 as estimated in the Fiscal Year 2021 budget document.
Recommendation:
1. Adopt Resolution No. 2020-04 appropriating funds for Fiscal Year 2021 Pension Policy, Operating and Capital Program Budgets and establishing controls thereon.
2. Discuss and take other action as appropriate.
Staff Reference: Michael Steinlicht, General Manager
Encina Wastewater Authority Board of Directors
July 22, 2020
vi Ref: Admin.20-14170
17. Primary Area Improvements Project Change Order Attachment Page 17
On February 27, 2019, the Board of Directors awarded a contract to Gateway Pacific Contractors, Inc. (Gateway) for the construction of the Primary Area Improvements Project (PAIP). This project includes upgrades and rehabilitation of the existing grit and screenings facilities and process equipment located in the primary treatment area of the Encina Water Pollution Control Facility (EWPCF). The total cost of the proposed Change Order exceeds the General Manager’s authority and therefore requires Board of Directors approval.
Recommendation:
1. Authorize the General Manager to approve a Change Order to the construction contract between the Encina Wastewater Authority with Gateway Pacific Contractors, Inc. in the amount of $424,532.
2. Discuss and take other action as appropriate.
Staff Reference: Michael Steinlicht, General Manager
~~~END OF DIRECTORS ACTION ITEMS~~~
~~~INFORMATION ITEMS~~~
18. Officer Report
Treasurer/Auditor – LeeAnn Warchol
No Attachment
~~~ END OF INFORMATION ITEMS~~~
~~~NEW BUSINESS~~~
Items to be added to the Agenda must meet all applicable provisions of the Brown Act.
19. General Manager’s Report No Attachment
20. General Counsel’s Report No Attachment
21. Committee Reports
a. Policy & Finance Committee next telephonic meeting date is August 11, 2020 at 10:00 a.m.
b. Capital Improvement Committee next telephonic meeting date is August 19, 2020 at 7:30 a.m.
22. Board of Directors Comments
23. Other Business
Encina Wastewater Authority Board of Directors
July 22, 2020
vii Ref: Admin.20-14170
~~~END OF AGENDA~~~
24. Adjournment
I, Michael Steinlicht, General Manager for Encina Wastewater Authority, hereby certify that the following agenda was posted at the Encina Water Pollution Control Facility at 6200 Avenida Encinas in Carlsbad, California at approximately 3:00 p.m. local time on July 15, 2020.
_____________________________ Michael Steinlicht, General Manager Encina Wastewater Authority (760) 438-3941
MINUTES
ENCINA WASTEWATER AUTHORITY BOARD OF DIRECTORS MEETING
WEDNESDAY, JUNE 24, 2020
ENCINA WATER POLLUTION CONTROL FACILITY VIA TELECONFERENCE
Ref: Admin.20‐14175
ALLAN JULIUSSEN, CHAIR KEITH BLACKBURN, VICE CHAIR
PRESENT
City of Carlsbad Keith Blackburn
City of Carlsbad Cori Schumacher
City of Vista/Buena Sanitation District Judy Ritter
City of Vista/Buena Sanitation District Amanda Rigby
Vallecitos Water District Hal Martin
Vallecitos Water District Jim Hernandez
Leucadia Wastewater District Elaine Sullivan
Leucadia Wastewater District Allan Juliussen
City of Encinitas Catherine Blakespear
City of Encinitas Joe Mosca (arrived at 8:10 a.m.)
General Manager Michael F. Steinlicht
Assistant General Manager Scott McClelland
General Counsel Adriana Ochoa
Auditor/Treasurer LeeAnn Warchol
ABSENT
None.
ALSO PRESENT
City of Vista/Buena Sanitation District Elmer Alex
City of Carlsbad Ken Knatz
City of Encinitas Isam Hireish, Carl Quiram
Leucadia Wastewater District Paul Bushee
Woodard & Curran Scott Goldman
EWA Staff Jennifer Basco, Doug Campbell, Vaughn DeGolyer
James Kearns, Octavio Navarrete, Tucker Southern,
Joe Spence, Lindsey Stephenson
1. CALL TO ORDER
Chair Juliussen called the meeting to order at 8:00 a.m.
2. PLEDGE OF ALLEGIANCE
Director Martin led the Pledge of Allegiance.
6-1
July 22, 2020
Encina Wastewater Authority (EWA) Board of Directors Minutes of June 24, 2020
Ref: Admin.20‐14175
3. GENERAL PUBLIC COMMENT PERIOD
None.
4. APPROVAL OF AGENDA
Upon a motion by Director Martin, seconded by Director Rigby, and carried by the following vote,
the Board of Directors:
Approved the June 24, 2020 agenda.
Representative Agency Vote
Chair Juliussen Leucadia Wastewater District Aye
Vice Chair Blackburn City of Carlsbad Aye
Director Schumacher City of Carlsbad Aye
Director Rigby City of Vista Aye
Director Ritter City of Vista Aye
Director Rigby Buena Sanitation District Aye
Director Ritter Buena Sanitation District Aye
Director Blakespear City of Encinitas Aye
Director Mosca City of Encinitas Absent
Director Sullivan Leucadia Wastewater District Aye
Director Martin Vallecitos Water District Aye
Director Hernandez Vallecitos Water District Aye
5. PRESENTATIONS AND AWARDS
None.
~~~CONSENT CALENDAR~~~
6. MINUTES OF MAY 27, 2020
7. OPERATIONS REPORT FOR MAY 2020
8. EWA MONTHLY FLOW AND CAPACITY MANAGEMENT REPORT FOR MAY 2020
9. APPROVAL OF DEMANDS FOR MAY 2020
10. TREASURER’S CASH AND INVESTMENT REPORT FOR MAY 2020
11. FISCAL YEAR‐TO‐DATE OPERATING BUDGET PERFORMANCE REPORT FOR MAY 2020
12. FY2020 FOURTH QUARTER OPERATING PROGRAM BUDGET TRANSFERS
13. ORF 1 FAN REPLACEMENT, EFFLUENT PIPE COATING REPAIR AND MISCELLANEOUS SURGE TOWER
REPAIRS AWARD
Upon a motion by Director Ritter, seconded by Director Hernandez, and carried by the following
vote, the Board of Directors:
Approved the Consent Calendar.
6-2
July 22, 2020
Encina Wastewater Authority (EWA) Board of Directors Minutes of June 24, 2020
Ref: Admin.20‐14175
Representative Agency Vote
Chair Juliussen Leucadia Wastewater District Aye
Vice Chair Blackburn City of Carlsbad Aye
Director Schumacher City of Carlsbad Aye
Director Rigby City of Vista Aye
Director Ritter City of Vista Aye
Director Rigby Buena Sanitation District Aye
Director Ritter Buena Sanitation District Aye
Director Blakespear City of Encinitas Aye
Director Mosca City of Encinitas Absent
Director Sullivan Leucadia Wastewater District Aye
Director Martin Vallecitos Water District Aye
Director Hernandez Vallecitos Water District Aye
~~~END OF CONSENT CALENDAR~~~
~~~BOARD OF DIRECTORS ACTION ITEMS~~~
14. SECONDARY CLARIFIERS AND STRAINERS IMPROVEMENTS CONSTRUCTION AWARD
Engineering Services Manager, Lindsey Stephenson provided a brief history on the Secondary
Clarifiers and Strainers. The secondary clarifiers are used as the final step in wastewater treatment at
the EWPCF prior to ocean discharge. The Secondary Clarifiers and Strainers Improvements Project
(Project) will complete rehabilitation in all seven active clarifiers, including coatings, gate
rehabilitation and replacement, and minor structural, electrical, and controls improvements. In
addition, the Project will replace the entire mechanical systems in Clarifiers 5, 6, and 8, which have
been in service for nearly 30 years, as well as two strainers for the plant water strainers, which have
been in service for nearly 40 years. Each of the proposed authorizations exceeds the General
Manager’s authority and therefore requires Board of Directors’ approval. The fiscal impact of the
combined recommendations is $7,275,117. Sufficient appropriations are available in the FY 2021
Capital Budget to initiate the Project, with additional funding to be included in the future fiscal years.
Member Agency Managers were briefed on the status of this project in the June meeting. The Capital
Improvement Committee reviewed this item in their June meeting and approved staff’s
recommendation.
Upon a motion by Director Hernandez, seconded by Director Ritter, and carried by the following
vote, the Board of Directors:
1. Authorized the General Manager to execute a contract with J.R. Filanc Construction
Company, Inc. (Filanc) in the amount of $6,202,111 for construction of the Secondary
Clarifiers and Strainer Improvements Project (Project).
2. Authorized the General Manager to execute a professional services agreement in the
amount not to exceed $831,251 to Carollo Engineers (Carollo) for construction
management services for the Project.
6-3
July 22, 2020
Encina Wastewater Authority (EWA) Board of Directors Minutes of June 24, 2020
Ref: Admin.20‐14175
3. Authorized the General Manager to execute a professional services agreement with
Woodard & Curran, Inc. (Woodard & Curran) in the amount not to exceed $241,755 for
engineering services during construction for the Project.
Representative Agency Vote
Chair Juliussen Leucadia Wastewater District Aye
Vice Chair Blackburn City of Carlsbad Aye
Director Schumacher City of Carlsbad Aye
Director Rigby City of Vista
Director Ritter City of Vista Aye
Director Rigby Buena Sanitation District
Director Ritter Buena Sanitation District Aye
Director Blakespear City of Encinitas Aye
Director Mosca City of Encinitas Aye
Director Sullivan Leucadia Wastewater District Aye
Director Martin Vallecitos Water District Aye
Director Hernandez Vallecitos Water District Aye
15. COGENERATION BUILDING STRUCTURAL REPAIR PROJECT – TASK ORDER NO. 2 DEMOLITION AND INSTALLATION OF NEW WEST WALL
Capital Projects Manager, James Kearns provided a brief history of the Cogeneration Building. The
Cogeneration Building is a critical component of the Encina Water Pollution Control Facility (EWPCF).
A building condition assessment identified corrosion of the air intake louvers located on the west side
of the second floor and irregularities in the external wall stucco finish. Further investigation found
deterioration and corrosion to be so advanced that the structural integrity of the west wall, the
support of the roof and second floor, had been compromised and needed extensive repair. Filanc has
now completed the shoring system installation and is now moving to the demolition and wall
replacement phase of the project. To expedite construction activities, the General Manager, per
Section 4.8 of EWA’s Purchasing Policy, authorized the award of Task Order No.2 for the demolition
and installation of the west wall. The total combined cost of these actions exceeds the General
Manager’s authority and therefore requires Board of Directors’ approval. Member Agency Managers
were briefed on this project in their June meeting and provided their support. The Capital
Improvement Committee reviewed this item in their June meeting and approved staff’s
recommendation. The combined fiscal impact of these actions is $2,013,649. Sufficient appropriations
are available in the Capital Budget to fund this project.
Director Rigby thanked staff for the report and for showing photos of the extensive damage, which
justified the need for repairs for the safety of the facility and staff. Director Mosca thanked staff for
highlighting the issue and inquired about the integrity of the other walls. Mr. Kearns explained that
condensation from the marine environment dripped down behind the louvres and the stucco and
migrated into the block wall. The new west wall will have a longer life than the rest of the building.
The rebar which is going back inside the wall will be treated. Staff is implementing measures to make
sure that this will not happen again. All buildings in the facility were subsequently fully assessed to
confirm that no other similar issues exist. Additional minor corrosion was found in another building,
which will be repaired. Director Mosca inquired about the new wall structure’s ability to withstand
6-4
July 22, 2020
Encina Wastewater Authority (EWA) Board of Directors Minutes of June 24, 2020
Ref: Admin.20‐14175
seismic activity. Mr. Kearns stated that Carollo Engineers conducted a structural analysis and per
California structural codes, concrete and rebar is the best approach. Director Mosca questioned why
this project is still considered an emergency if it has been progressing over several years. Mr. Kearns
informed the Board Members that even though the shoring system is in place, there is still a significant
risk to the agency with a potential catastrophic failure of the building and the shoring system. Also,
due to a lot of unknowns with the project, bidding the project out for a fixed price would be unwise
and would likely include many change orders. The shoring phase was a very complex process and the
project has been slow and painstaking. EWA wants to ensure that the facility is protected due to the
critical nature of the equipment in the building.
Upon a motion by Director Rigby, seconded by Director Hernandez, and carried by the following
vote, the Board of Directors:
1. Authorized the General Manager to award a Task Order in the amount of $1,598,465 to
J.R. Filanc Construction Company Inc. for Cogeneration Building Structural Repair Project
Demolition and Installation of the West Wall.
2. Authorized the General Manager to execute a continuation of engineering services
agreement with Carollo Engineers in the amount not to exceed $415,184 for engineering
support during construction and construction management services.
3. Authorized the General Manager to approve the transfer of unexpended appropriations
from the Capital Improvement Program budget in the amount of $513,649 to the
Cogeneration Building Structural Repair Project.
Representative Agency Vote
Chair Juliussen Leucadia Wastewater District Aye
Vice Chair Blackburn City of Carlsbad Aye
Director Schumacher City of Carlsbad Aye
Director Rigby City of Vista Aye
Director Ritter City of Vista Aye
Director Rigby Buena Sanitation District Aye
Director Ritter Buena Sanitation District Aye
Director Blakespear City of Encinitas Aye
Director Mosca City of Encinitas Aye
Director Sullivan Leucadia Wastewater District Aye
Director Martin Vallecitos Water District Aye
Director Hernandez Vallecitos Water District Aye
~~~END OF BOARD OF DIRECTORS ACTION ITEMS~~~
~~~INFORMATION ITEMS~~~
16. OFFICER’S REPORT
Auditor/Treasurer, LeeAnn Warchol reported on the following items:
2020 Budget performance is projecting 97% spent. Over half of our operating budget is labor
related which is coming in right on target.
6-5
July 22, 2020
Encina Wastewater Authority (EWA) Board of Directors Minutes of June 24, 2020
Ref: Admin.20‐14175
Independent Auditors’ have successfully completed preliminary field testing. They will return
in September for final field testing. Everything went smoothly.
17. GENERAL MANAGER’S REPORT
General Manager, Michael Steinlicht, reported on the following items:
EWA continues working under modified operations. No infections have been reported by
staff to date; however, a construction employee did test positive. Due to EWA’s safe work
practices, it does not appear that transmission was spread to staff.
For the upcoming month of July, PFC, CIC, MAM, and Board meetings will continue on the
online platform.
Director Mosca inquired about the Investment Policy discussion at this month’s PFC meeting.
General Manager Steinlicht stated that staff is working on the Committee’s direction to look
outside the organization at investment policies from the member agencies as well as other
wastewater agencies. Staff plans on bringing the policy back for board consideration in
August.
18. GENERAL COUNSEL’S REPORT
None.
19. COMMITTEE REPORTS
a. Policy and Finance Committee: Director Schumacher stated the PFC met on June 9, 2020 and
discussed the May 2020 Tactical Plan Status Report; FY2020 Fourth Quarter Operating
Program Budget Transfers; and Investment Policy Annual Review. The next meeting is
scheduled for July 14, 2020 at 10:00 a.m.
b. Capital Improvement Committee: Vice Chair Blackburn stated the CIC met on June 17, 2020
and discussed the Capital Improvement Projects Status Report; Secondary Clarifiers and
Strainers Improvements Construction Award; ORF 1 Fan Replacement, Effluent Pipe Coatings
Repair and Miscellaneous Surge Tower Repairs Award; and Cogeneration Building Structural
Repair Project – Task Order No. 2 Demolition and Installation of New West Wall. The next
meeting is scheduled for July 15, 2020 at 7:30 a.m.
20. BOARD OF DIRECTORS COMMENTS
Director Sullivan apologized for interruption to the meeting due to the loss of her internet connection.
She was able to phone into the meeting, heard all items discussed, and would like the record to reflect
that she voted “yes” to all items that required a vote. Director Sullivan also stated that she will be
6-6
July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors
Minutes of June 24, 2020
Ref: Admin.20‐14175
attending the two‐day WateReuse Annual Conference, which starts today. Chair Juliussen thanked
staff for a great job and thanked the Board of Directors for their patience.
21. OTHER BUSINESS
None.
22. ADJOURNMENT
The meeting was adjourned at 8:48 a.m.
ATTEST: ATTEST:
______________________________ ______________________________
Allan Juliussen, Board Chair Michael Steinlicht, General Manager
Encina Wastewater Authority Encina Wastewater Authority
6-7
Ref: 20-14176
ENCINA WASTEWATER AUTHORITY
BOARD OF DIRECTORS
Item : 7
Date : July 22, 2020
To : Honorable Chair and Board of Directors
From : Octavio Navarrete, Director of Operations
Issue : OPERATIONS REPORT FOR JUNE 2020
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Receive and file the Operations Report for June 2020.
FIVE YEAR STRATEGIC BUSINESS PLAN REFERENCE
Strategic Initiative No. 8 requires EWA to provide consistent communication to key stakeholders regarding the operation, maintenance and administration of the Encina Water Pollution Control Facility (EWPCF) and contract operated remote facilities.
DISCUSSION
The Operations Report provides a summary of EWPCF performance metrics, significant activities at the EWPCF and contract operated remote facilities, public outreach activities, odor complaints, completed safety training and recordable injuries.
THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Receive and file the Operations Report for June 2020.
Attachment 1: Operations Report June 2020
Prepared by: Blake Bechtold, Operations Shift Supervisor Reviewed by: Joseph Cipollini, Resource Recovery Manager Approved by: Octavio Navarrete, Director of Operations
7-1
ENCINA WASTEWATER AUTHORITY OPERATIONS REPORT
June 2020
Agenda Item No. 7
1. Wastewater Treatment
The EWPCF maintained 100% compliance with its National Pollutant Discharge Elimination System(NPDES) ocean discharge permit.
The EWPCF treated on average 20.69 million gallons per day (MGD) of wastewater.
The EWPCF’s removal efficiency averaged 98.18% for Total Suspended Solids (TSS) and 98.09% forCarbonaceous Biochemical Oxygen Demand (CBOD). EWPCF’s NPDES Permit requires 85% averageremoval efficiency for both TSS and CBOD.
The EWPCF reclaimed on average 5.70 MGD of water for in‐plant use.
A total of 113.61 million gallons (MG) of EWPCF secondary effluent was diverted to the CarlsbadWater Reclamation Facility (CWRF) for reuse.
A total of 16.59 MG of EWPCF secondary effluent was diverted to Leucadia Wastewater District’sGafner Water Reclamation Facility for reuse.
2. Biosolids Treatment
Processed 8.40 MG of digested sludge through centrifuges as biosolids.
Produced 462.4 dry tons of Class A Exceptional Quality biosolids meeting EPA Part 503 regulationsfor unrestricted reuse.
Produced 136.9 dry tons of Class B biosolids for land application in Yuma.
Produced approximately 23.52 million cubic feet of digester gas with 58.84% methane content foruse in the cogeneration facility and heat dryer.
Biosolids production/distribution:
Dry Tons Percentage of Total
Class A Exceptional Quality 462.4 77.2%
Class B 136.9 22.8%
Pure Green (Fertilizer) 129.5 21.6%
Land Application (Yuma) 469.8 78.4%
7-3
July 22, 2020
Encina Wastewater Authority (EWA) Board of Directors Operations Report – June 2020
Page 2
Ref: Admin. 20‐14176a
3. Cogeneration Facility
Produced 1,180,612 kWh of electricity or 85% of total electricity used.
Generated on average 11,463 cubic feet per minute (CFM) of air for secondary treatment.
Energy Management Program (EMP) implemented daily from 16:00 to 21:00 for the month of June. During this period, the EWPCF is isolated from the San Diego Gas and Electric (SDG&E) electrical grid to reduce costs.
Major overhaul on engine generator #2 completed.
4. Significant Operations Activities
Member Agency vactor truck crews disposed of 4 loads of debris from collection line cleaning, totaling 1,100 gallons of sewage.
Received 32 deliveries of fats, oils, and grease (FOG) totaling 127,920 gallons. Received several trial loads of screened and thickened FOG for evaluation as alternative fuel.
Received 88 deliveries of brewery waste totaling 429,005 gallons.
REMOTE FACILITIES
Carlsbad Water Recycling Facility (CWRF)
CWRF reclaimed a total of 86.16 MG.
Ultra‐Filtration System feed pump #4 returned to service.
Raceway Basin Pump Station (RBPS)
Monthly generator test performed.
Generator refueled by Bay City.
Buena Vista Pump Station (BVPS):
Monthly generator test performed.
Generator refueled by Bay City.
Vandalized fence repaired by contractors.
Buena Creek Pump Station (BCPS):
Monthly generator test performed.
Generator refueled by Bay City.
7-4
July 22, 2020
Encina Wastewater Authority (EWA) Board of Directors Operations Report – June 2020
Page 3
Ref: Admin. 20‐14176a
Agua Hedionda Pump Station (AHPS):
Monthly generator test performed.
Monthly bypass pump test performed.
Agua Hedionda Lift Station (AHLS):
Monthly generator test performed.
PUBLIC OUTREACH
EWA did not perform any public outreach during the month of June.
ODOR COMPLAINTS
EWA received one odor complaint during the month of June. The complaint was from the Altamira neighborhood east of the EWPCF. Staff performed both plant and site inspections and spoke with the complainant. Staff investigations identified break through of the carbon media for ORF III. Prominent Systems replaced the carbon media in the West tower and will be replacing the carbon media in the East tower next month.
COMPLETION OF SAFETY TRAINING:
Topic OPS TS EC ADMIN
HAZWOPER # 4 100% 100% 100% 100%
Heat Dryer SOP 63/ Andritz Module # 7 100%
EWA COVID‐19 100% 100% 100% 89%
NEO 100%
INJURY REPORT:
There was one OSHA recordable incident for the month of June.
7-5
July 22, 2020
Encina Wastewater Authority (EWA) Board of Directors Operations Report – June 2020
Page 4
Ref: Admin. 20‐14176a
5
10
15
20
25
30
35
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2020
MGD Influent Distribution
EWPCF CWRF GWRF Outfall
85%
0%
25%
50%
75%
100%
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2020
Plant Efficiency
TSS Removal CBOD Removal
Gafner was offline in January and February.
NPDES permit requires a minimum of 85% removal.
100
200
300
400
500
600
700
800
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2020
Dry Tons Biosolids Distribution
Tier I Tier II Class B Tier II demand is less during winter months
Class B production due to dryer outages.
83%
82% 84
%
85%
85%
85%
84%
84%
84%
83%
85%
85%
0%
25%
50%
75%
100%
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2020
Electricity Source
Produced Purchased
Normalized for number of days in each month.
7-6
ENCINA WASTEWATER AUTHORITY | Key Performance Indicators FY2020 June 30, 2020
ref: Admin: 20 1417 b
hours per employee(annualized)
% of salaries total injury rate employee turnover %(excluding retirements)
complaints
Training Overtime Safety Attrition Odor
PureGreen Class A Production The Operations Team uses the heat drying process to produce a Class A Biosolidknown as PureGreen fertilizer which can be directly applied to land. This metricillustrates the percentage of wastewater solids converted into Class A. This maygradually decline as solids receiving increases and heat dryer capacity is reached.
Alternative Fuel Receiving The Alternative Fuel Receiving Facility receives deliveries of Fats, Oils, Grease(FOG) and Brewery Waste. EWA earns tipping fees for receiving these andgenerates additional methane gas by feeding it into the digesters. This metricillustrates the monthly average gallons of FOG and Brewery Waste received.
Operating Costs per Million Gallons Treated This metric depicts each month's rolling 12 month costper million gallons treated. EWA's operating costs arelargely driven by labor, energy and chemical consumption.Because much of this is commodity price driven, weanticipate the cost per million gallons to increasing by aninflationary rate, all else being equal. This graphillustrates FY2018 costs gradually increasing as a result oftwo additional staff coming onboard to reduceoperational safety risks. In FY2019, energy costsescalated, though these costs were offset by additionalgallons being treated at a low marginal cost. FY2020 costsremain relatively steady.
Encina Water Pollution Control Facility
Proactive Maintenance The Technical Services Team focuses on performing preventive maintenance in aneffort to support equipment reliability and service life, and in turn, reducereactive costs. It is standard for two thirds of maintenance activities in treatmentplants to be proactive in nature, but staff has self imposed a higher goal.
These key performance indicators illustrate various aspects of the EWA's operations with historical performance,industry benchmarks and self imposed goals.
NPDES Permit Compliance EWA holds a National Pollutant Discharge Elimination System (NPDES) Permitissued by the Regional Water Quality Control Board for discharge from the EncinaOcean Outfall. In March 2018, the facility received a permit violation afterexperiencing a plant upset for the first time in nine years.
Electricity Onsite Generation EWA generates the majority of its Treatment Plant electricity demand onsitethrough its Cogeneration System whereby methane gas is used as an alternativefuel source. Historical onsite generation has been at 80%, but staff implementedoperational changes in FY2019 in hopes of making 90% the future benchmark.
Item 7
32.1EWA yrs
Goal yrs
88%86%
84%FY 2020
GoalFY 2019
$1,350
$1,450
$1,550
Jul Oct Jan Apr
FY 2018 FY 2019 FY 2020
75%77%78%FY 2020
GoalFY 2019
73%76%
85%FY 2020
GoalFY 2019
545,000585,555
475,032FY 2020 Avg.
GoalFY 2019 Avg.
3040 38
FY20Goal FY19
3 3 2
FY20Goal FY19
<2.3% 2.9% 7.0%
FY20Goal FY19
3.0
0FY20Goal FY19
<1.6 7.0
8.6 1FY20
Goal FY19
<<
galgal
gal
7-7
Ref: Admin.20‐14174
ENCINA WASTEWATER AUTHORITY
BOARD OF DIRECTORS
Item : 8
Date : July 22, 2020
To : Honorable Chair and Board of Directors
From : Doug Campbell, Director of Environmental Compliance
Issue : EWA MONTHLY FLOW AND CAPACITY MANAGEMENT REPORT FOR JUNE 2020
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Receive and file the Flow and Capacity Management Report for June 2020.
FIVE‐YEAR STRATEGIC BUSINESS PLAN REFERENCE
Strategic Initiative No. 8: Engage key stakeholders.
DISCUSSION
Attachment 1 is the Member Agency Flow and Capacity Management Report for June 2020. EWA continues to ensure adequate capacity to meet projected needs.
THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Receive and file the Flow and Capacity Management Report for June 2020.
Attachment 1: EWA Flow and Capacity Management Report for June 2020
Prepared by: Jeff Parks, Laboratory Manager Reviewed by: Rachael Morgan, Associate Chemist Approved by: Doug Campbell, Director of Environmental Compliance
8-1
Agenda Item No. 8
Ref: Admin. 20 14174
Phase V % of Capacity
Member Current Projected Available % of Capacity Used and
Agency Flow Committed Capacity Capacity (a) Used (b) Committed (c)
Vista * 5.75 0.084 10.67 4.84 54% 55%
Carlsbad 6.35 1.694 10.26 2.22 62% 78%
Buena* 1.91 0.012 3.00 1.08 64% 64%
Vallecitos* 3.55 0.017 7.67 4.10 46% 47%
Leucadia 3.88 0.055 7.11 3.17 55% 55%
Encinitas 0.91 0.155 1.80 0.73 51% 59%
Total 22.35 2.02 40.51 16.14 55% 60%
Phase V % of Capacity
Member Current Projected Available % of Capacity Used and
Agency Flow Committed Capacity Capacity (a) Used (b) Committed (c)
Vista* 5.75 0.084 10.67 4.84 54% 55%
Carlsbad 6.35 1.694 10.26 2.22 62% 78%
Buena (d)* 1.91 0.012 3.00 1.08 64% 64%
Vallecitos (d)* 6.98 0.017 10.47 3.47 67% 67%
Leucadia (d) 3.88 0.055 7.11 3.17 55% 55%
Encinitas 0.91 0.155 1.80 0.73 51% 59%
Total 25.78 2.02 43.31 15.51 60% 64%
Phase V % of Capacity
Member Current Projected Available % of Capacity Used and
Agency Flow Committed Capacity Capacity (a) Used (b) Committed (c)
Vista* 5.75 0.084 10.67 4.84 54% 55%
Carlsbad (f) 3.48 1.694 10.26 5.09 34% 50%
Buena (e) * 1.91 0.012 3.00 1.08 64% 64%
Vallecitos (e) * 3.55 0.017 10.47 6.90 34% 34%
Leucadia (f) 3.49 0.055 7.11 3.56 49% 50%
Encinitas 0.91 0.155 1.80 0.73 51% 59%
Total 19.09 2.02 43.31 22.20 44% 49%
All units are in Million Gallons Per Day (MGD) unless specified otherwise.
(a) Available capacity = (Member Agency Phase V Projected Capacity) (Current + Committed Flows)
(b) % Capacity Used = Current Flow / Member Agency Phase V Projected Capacity
(c) % Capacity Used and Committed = (Current Flow + Committed) / Member Agency Phase V Projected Capacity
(d) To determine the total solids flow, the plant influent from the reclamation facilities is added to the raw wastewater flow.
(e) To determine the total outfall flow, the reclamation failsafe line flow is added to the raw wastewater flow.
(f) To determine LWD and CARLSBAD Outfall Flow, the corresponding recycled flow is subtracted from influent flows.
* Arbor Ranch Flows and Rancho Santalina Flows are subtracted from Vista and Buena and are added to Vallecitos
ENCINA WATER POLLUTION CONTROL FACILITIES CAPACITY MANAGEMENT REPORT
June 2020
TREATMENT PLANT LIQUID
TREATMENT PLANT SOLIDS
OUTFALL FLOW
8-3
ITEM 9 APPROVAL OF DEMANDS DASHBOARD FOR JUNE 2020
Operating 1,933,855$
Capital 3,246,966$
June Demands 5,180,820$
YTD Demands 47,280,605$
FY2020 Budget 38,086,184$
FY19 Cap. Carryforward 19,563,429$
Total 57,649,613$
646 invoices processed
*124% of the 2020 budget spent asa result of the FY 2019 CapitalCarryforward being used
Summary
14% 124%51%
49%
YTD
2020 Budget*37%
63%
June
2020 Budget
$1532 K
$110 K$120 K$151 K$157 K$215 K$236 K$256 K$327 K$399 K$309K
OTHER
CDM SMITH
STANEK CONSTRUCTORS, INC.
LOGICALIS
JR FILANC CONSTRUCTION COMPANY INC
CAROLLO ENGINEERS, INC.
CDW GOVERNMENT
KENNEDY JENKS CONSULTING
SAN DIEGO GAS & ELECTRIC
GATEWAY PACIFIC CONTRACTORS, INC.
HAWTHORNE POWER SYSTEMS
Top 10 VendorsDemands Mix
$4,192K
Vendors81%
$989K
Payroll19%
$3.2 M
$1.9 M
$1.0 M
$2.0 M
$3.0 M
$4.0 M
$5.0 M
$6.0 M
$7.0 M
$8.0 M
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
FY2020
Historical Trend
This represents unaudited data. 9-1
Ref: F&HR.20 4028
ENCINA WASTEWATER AUTHORITY
BOARD OF DIRECTORS
Item : 9
Date : July 22, 2020
To : Honorable Chair and Board of Directors
From : LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor
Issue : APPROVAL OF DEMANDS FOR JUNE 2020
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Approve checks and electronic payments totaling $5,180,820.46.
FIVE YEAR STRATEGIC BUSINESS PLAN REFERENCE
Strategic Initiative No. 6: Continue fiscal responsibility and revenue generation.
DISCUSSION
Attached are Warrants for Payment and Check Registers describing all payments made by EWA for themonth ended June 2020.
The Operating Program expenses totaled $1,933,854.92 and the Capital Improvement Program expensestotaled $3,246,965.54. Properly authorized current or prior year appropriations are budgeted to fundeach payment presented. Questions should be directed to LeeAnn Warchol at (760) 268 8849.
THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Approve checks and electronic payments totaling $5,180,820.46.
Attachment 1 Summary of Demands by Account June 2020Attachment 2 Payroll Warrant for Payment & Check Register June 01, 2020Attachment 3 Payroll Warrant for Payment & Check Register June 03, 2020Attachment 4 Payroll Warrant for Payment & Check Register June 05, 2020Attachment 5 Payroll Warrant for Payment & Check Register June 17, 2020Attachment 6 Payroll Warrant for Payment & Check Register June 24, 2020Attachment 7 Flex Benefit Reimbursement Check Register June 2020Attachment 8 Accounts Payable Check Register June 2020
Prepared by: Grace Gilberg, Accounting Technician IIReviewed by: Mariana Grindley, Accounting Technician IIApproved by: LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor
9-2
Date Class Description and Check #s Amounts
06.01.20 PR Misc Payroll Tax $ 130.53PR Misc Calpers Retirement $ 195.99
AP AP Regular Cks 189074 189116, EFT's 4232 4279 $ 947,267.93PR AP Payroll Cks 189095,189098,189113, EFT's 4240,4261,4271,4272 $ 151,904.64PR Flex Cks 294.00
PR Payroll Direct Deposit $ 203,410.75PR Payroll Tax $ 56,960.01PR Calpers Retirement $ 56,948.10PR Misc PR Cks 3360 $ 441.17
06.05.20 PR Misc Payroll tax $ 6.94
06.12.20 PR Flex Cks $ 1,565.41
06.16.20 PR Flex Cks $ 280.06
06.17.20 AP AP Regular Cks 189117 189177, EFT's 4280 4330 $ 1,923,648.85PR AP Payroll Cks 189127, EFT's 4293,4307,4308,4315 $ 67,531.19PR Payroll Direct Deposit $ 198,057.35PR Payroll Cks 3361 $ 1,671.95PR Payroll Tax $ 55,781.82PR Calpers Retirement $ 55,807.24
06.18.20 PR Flex Cks $ 30.00
06.22.20 PR Flex Cks $ 445.00
06.24.20 AP VOID Check 4324 $ (846.44)PR Misc PR cks 3362 $ 349.75
06.25.20 AP Bank Fee $ 1,266.80
06.17.20 AP AP Regular Cks 189178 189227, EFT's 4331 4733 $ 1,320,370.15PR AP Payroll Cks 189189,189211, EFT's 4358,4367,4369 $ 137,301.27
Total $ 5,180,820.46
Payroll $ 989,113.17Operating & Capital $ 4,191,707.29
Total $ 5,180,820.46
SUMMARY OF DEMANDSJUNE 2020
06.02.20
06.03.20
9-4
Employee ID /Vendor #
Vendor Name Check Date Net Amount Advice #/Check #
INTERNAL REVENUE SERVICE 6/1/2020 130.53CALIFORNIA STATE TAX 6/1/2020 195.99SUBTOTAL TAX LIABILITY $ 326.52
PAYROLL GRAND TOTAL $ 326.52
MISC PAYROLL 6/01/2020CHECK DATE 6/01/2020
9-6
Employee ID /Vendor #
Vendor Name Check Date Net Amount Advice #/Check #
2093 6/3/2020 2,189.33 270902089 6/3/2020 2,110.75 270912092 6/3/2020 2,045.28 270922085 6/3/2020 5,558.25 270938191 6/3/2020 2,567.26 270942083 6/3/2020 3,576.87 270958081 6/3/2020 5,765.83 270968180 6/3/2020 4,100.03 270975200 6/3/2020 1,524.85 270985192 6/3/2020 3,020.45 270998182 6/3/2020 2,537.57 271005056 6/3/2020 3,167.72 271015177 6/3/2020 3,834.39 271025197 6/3/2020 2,138.08 271035204 6/3/2020 2,566.94 271045185 6/3/2020 3,579.43 271055188 6/3/2020 3,345.46 271065209 6/3/2020 1,715.15 271072065 6/3/2020 2,456.77 271088150 6/3/2020 2,670.53 271095171 6/3/2020 2,913.93 271105198 6/3/2020 2,441.11 271115174 6/3/2020 4,023.43 271125202 6/3/2020 3,519.39 271135193 6/3/2020 2,931.75 271145208 6/3/2020 2,139.55 271155195 6/3/2020 3,158.04 271165191 6/3/2020 2,778.27 271175190 6/3/2020 2,490.91 271185207 6/3/2020 2,067.96 271195176 6/3/2020 3,669.12 271205178 6/3/2020 2,895.68 271215203 6/3/2020 3,154.67 271225181 6/3/2020 3,067.51 271235161 6/3/2020 4,985.89 271245184 6/3/2020 2,727.72 271255206 6/3/2020 2,114.36 271268189 6/3/2020 2,051.33 271278208 6/3/2020 2,014.36 271282056 6/3/2020 2,630.04 271298215 6/3/2020 2,548.22 271308192 6/3/2020 3,049.86 271318200 6/3/2020 3,314.83 271328188 6/3/2020 2,962.88 271338168 6/3/2020 3,748.79 271348217 6/3/2020 1,769.85 27135
PAY PERIOD 5/14/2020 5/27/2020CHECK DATE 6/3/2020
9-8
PAY PERIOD 5/14/2020 5/27/2020CHECK DATE 6/3/2020
2063 6/3/2020 2,163.43 271368184 6/3/2020 3,136.00 271378178 6/3/2020 3,407.88 271388203 6/3/2020 2,126.69 271392058 6/3/2020 2,260.45 271408196 6/3/2020 3,325.04 271418186 6/3/2020 2,282.88 271422087 6/3/2020 4,696.25 271438201 6/3/2020 2,677.59 271442091 6/3/2020 3,685.58 271458216 6/3/2020 2,709.22 271468171 6/3/2020 3,348.65 271472090 6/3/2020 1,001.87 271483117 6/3/2020 4,266.82 271493201 6/3/2020 2,407.79 271503203 6/3/2020 1,698.51 271513184 6/3/2020 3,619.34 271523185 6/3/2020 2,473.86 271533177 6/3/2020 2,604.50 271543202 6/3/2020 1,990.45 271553189 6/3/2020 3,413.75 271563198 6/3/2020 2,993.77 271573197 6/3/2020 2,033.20 271582071 6/3/2020 3,446.84 27159
SUBTOTAL DIRECT DEPOSIT $ 203,410.75
2065 6/3/2020 441.17 3360SUBTOTAL MISC PAYROLL CHECKS $ 441.17
INTERNAL REVENUE SERVICE 6/3/2020 43,834.46CALIFORNIA STATE TAX 6/3/2020 13,125.55SUBTOTAL TAX LIABILITY $ 56,960.01
CALPERS RETIREMENT 6/3/2020 56,948.10SUBTOTAL CALPERS $ 56,948.10
PAYROLL GRAND TOTAL $ 317,760.03
9-9
Employee ID /Vendor #
Vendor Name Check Date Net Amount Advice #/Check #
INTERNAL REVENUE SERVICE 6/5/2020 6.94SUBTOTAL TAX LIABILITY $ 6.94
PAYROLL GRAND TOTAL $ 6.94
MISC PAYROLL 6/05/2020CHECK DATE 6/05/2020
9-11
Employee ID /Vendor #
Vendor Name Check Date Net Amount Advice #/Check #
2093 6/17/2020 2,189.33 271662089 6/17/2020 2,110.75 271672092 6/17/2020 2,045.28 271682085 6/17/2020 5,558.25 271698191 6/17/2020 2,567.26 271702083 6/17/2020 3,576.87 271718081 6/17/2020 5,765.83 271728180 6/17/2020 4,565.16 271735200 6/17/2020 1,611.65 271745192 6/17/2020 3,165.71 271758182 6/17/2020 2,249.24 271765056 6/17/2020 2,817.81 271775177 6/17/2020 3,834.39 271785197 6/17/2020 1,850.87 271795204 6/17/2020 2,735.94 271805185 6/17/2020 3,136.44 271815188 6/17/2020 2,864.66 271825209 6/17/2020 1,778.59 271832065 6/17/2020 2,916.69 271848150 6/17/2020 3,554.81 271855171 6/17/2020 2,913.94 271865198 6/17/2020 2,490.61 271875174 6/17/2020 4,023.43 271885202 6/17/2020 2,632.02 271895193 6/17/2020 2,687.53 271905208 6/17/2020 2,077.94 271915195 6/17/2020 2,641.60 271925191 6/17/2020 2,858.59 271935190 6/17/2020 2,490.97 271945207 6/17/2020 1,778.63 271955176 6/17/2020 3,489.40 271965178 6/17/2020 2,990.75 271975203 6/17/2020 2,323.30 271985181 6/17/2020 3,067.50 271995161 6/17/2020 5,246.63 272005184 6/17/2020 2,358.63 272015206 6/17/2020 2,052.62 272028189 6/17/2020 2,006.29 272038208 6/17/2020 1,681.45 272042056 6/17/2020 2,630.04 272058215 6/17/2020 2,147.67 272068192 6/17/2020 3,244.74 272078200 6/17/2020 3,225.48 272088188 6/17/2020 2,310.61 272098168 6/17/2020 3,748.78 272108217 6/17/2020 1,769.85 27211
PAY PERIOD 5/28/2020 6/10/2020CHECK DATE 6/17/2020
9-13
PAY PERIOD 5/28/2020 6/10/2020CHECK DATE 6/17/2020
2063 6/17/2020 2,007.16 272128184 6/17/2020 2,002.48 272138178 6/17/2020 3,407.87 272148203 6/17/2020 2,126.69 272152058 6/17/2020 2,260.46 272168196 6/17/2020 3,325.04 272178186 6/17/2020 2,282.88 272182087 6/17/2020 4,696.25 272198201 6/17/2020 2,456.19 272202091 6/17/2020 3,685.58 272218216 6/17/2020 2,709.22 272228171 6/17/2020 3,348.65 272232090 6/17/2020 1,147.79 272243117 6/17/2020 4,266.82 272253201 6/17/2020 2,587.96 272263203 6/17/2020 1,816.28 272273184 6/17/2020 3,619.34 272283185 6/17/2020 2,658.33 272293177 6/17/2020 2,604.50 272303202 6/17/2020 1,990.46 272313189 6/17/2020 3,413.76 272323198 6/17/2020 2,379.07 272333197 6/17/2020 2,033.20 272342071 6/17/2020 3,446.84 27235
SUBTOTAL DIRECT DEPOSIT $ 198,057.35
5210 6/17/2020 1,671.95 3361SUBTOTAL PAYROLL CHECKS $ 1,671.95
INTERNAL REVENUE SERVICE 6/17/2020 42,996.58CALIFORNIA STATE TAX 6/17/2020 12,785.24SUBTOTAL TAX LIABILITY $ 55,781.82
CALPERS RETIREMENT 6/17/2020 55,807.24SUBTOTAL CALPERS $ 55,807.24
PAYROLL GRAND TOTAL $ 311,318.36
9-14
Employee ID /Vendor #
Vendor Name Check Date Net Amount Advice #/Check #
5198 6/24/2020 349.75 3362SUBTOTAL MISC PAYROLL CHECKS $ 349.75
PAYROLL GRAND TOTAL $ 349.75
MISC PAYROLL 6/24/2020CHECK DATE 6/24/2020
9-16
Check No. Employee No. Check Date Amount Plan Year
7472539 3117 6/2/2020 $ 294.00 2020$ 294.00
7512763 2091 6/12/2020 $ 1,565.41 2020$ 1,565.41
7526849 8081 6/16/2020 $ 280.06 2020$ 280.06
7536473 8196 6/18/2020 $ 30.00 2020$ 30.00
7545502 8201 6/22/2020 $ 445.00 2020$ 445.00
Total for Month $ 2,614.47
Encina Wastewater AuthorityFlexible Spending Reimbursement Register for the Month Ended June 2020
9-18
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
1689
AFFO
RDAB
LEDR
AIN
SERV
ICE
INC
1158
8045
042
326/
2/20
2072
0.00
2214
AMAN
DAYO
UNG
RIGB
YRI
GBY
BOD
05/2
042
336/
2/20
2021
3.21
2214
AMAN
DAYO
UNG
RIGB
YRI
GBY
PFC
05/2
042
336/
2/20
2021
3.21
2254
AMER
ICAN
SECU
RITY
GROU
P26
472
4234
6/2/
2020
4,06
1.76
1759
AMET
EKAR
IZON
AIN
STRU
MEN
T,LL
CA0
0000
3532
7742
356/
2/20
2013
,912
.04
1623
ANDR
ITZ
SEPA
RATI
ONIN
C84
8009
8878
4236
6/2/
2020
9,00
9.96
1623
ANDR
ITZ
SEPA
RATI
ONIN
C84
8009
8879
4236
6/2/
2020
4,85
4.65
1623
ANDR
ITZ
SEPA
RATI
ONIN
C84
8009
8880
4236
6/2/
2020
2,64
7.74
2207
ARBO
NEQ
UIPM
ENT
CORP
ORAT
ION
2280
877
4237
6/2/
2020
3,15
2.97
977
CALI
FORN
IAEN
VIRO
NMEN
TALC
ONTR
OLS
INC
4225
4238
6/2/
2020
481.
0297
7CA
LIFO
RNIA
ENVI
RONM
ENTA
LCON
TROL
SIN
C42
2642
386/
2/20
202,
806.
0413
64CA
LIFO
RNIA
WAT
ERTE
CHNO
LOGI
ES37
481
4239
6/2/
2020
5,68
2.56
1364
CALI
FORN
IAW
ATER
TECH
NOLO
GIES
3748
942
396/
2/20
206,
066.
5513
64CA
LIFO
RNIA
WAT
ERTE
CHNO
LOGI
ES37
408
4239
6/2/
2020
6,64
9.91
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8691
842
416/
2/20
204,
542.
0017
96CA
ROLL
OEN
GINE
ERS,
INC.
0186
919
4241
6/2/
2020
7,83
6.75
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8715
842
416/
2/20
209,
123.
9017
96CA
ROLL
OEN
GINE
ERS,
INC.
0187
159
4241
6/2/
2020
2,93
8.50
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8716
142
416/
2/20
202,
333.
7517
96CA
ROLL
OEN
GINE
ERS,
INC.
0187
162
4241
6/2/
2020
950.
0017
96CA
ROLL
OEN
GINE
ERS,
INC.
0187
163
4241
6/2/
2020
6,62
5.00
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8716
442
416/
2/20
201,
522.
5017
96CA
ROLL
OEN
GINE
ERS,
INC.
0187
483
4241
6/2/
2020
21,4
37.2
517
96CA
ROLL
OEN
GINE
ERS,
INC.
0187
486
4241
6/2/
2020
12,1
54.3
122
91CA
THER
INE
BLAK
ESPE
ARBL
AKES
PEAR
BOD
05/2
042
426/
2/20
2021
3.21
2291
CATH
ERIN
EBL
AKES
PEAR
BLAK
ESPE
ARPF
C05
/20
4242
6/2/
2020
213.
2123
11CD
MSM
ITH
9009
9159
4243
6/2/
2020
9,59
5.00
1440
CDW
GOVE
RNM
ENT
XWN5
715
4244
6/2/
2020
55.1
014
40CD
WGO
VERN
MEN
TXW
Q47
242
446/
2/20
201,
473.
6814
40CD
WGO
VERN
MEN
TXS
K121
242
446/
2/20
201,
477.
4714
40CD
WGO
VERN
MEN
TXT
V941
742
446/
2/20
2041
7.04
1440
CDW
GOVE
RNM
ENT
XTV9
782
4244
6/2/
2020
2,61
9.27
1440
CDW
GOVE
RNM
ENT
XTW
9590
4244
6/2/
2020
1,55
9.55
1440
CDW
GOVE
RNM
ENT
XTX5
275
4244
6/2/
2020
687.
5414
40CD
WGO
VERN
MEN
TXT
X531
642
446/
2/20
201,
411.
2314
40CD
WGO
VERN
MEN
TXV
F014
242
446/
2/20
2012
1,92
1.13
1440
CDW
GOVE
RNM
ENT
XVJ9
979
4244
6/2/
2020
2,46
8.92
1440
CDW
GOVE
RNM
ENT
XVL2
018
4244
6/2/
2020
513.
74C
1440
CDW
GOVE
RNM
ENT
XVP3
660
4244
6/2/
2020
4,39
0.22
1440
CDW
GOVE
RNM
ENT
XVQ
1531
4244
6/2/
2020
4,25
7.00
118
CONS
OLID
ATED
ELEC
TRIC
ALDI
STRI
BUTO
RS,I
NC.
0949
5508
9942
456/
2/20
2072
.06
118
CONS
OLID
ATED
ELEC
TRIC
ALDI
STRI
BUTO
RS,I
NC.
0949
5509
2742
456/
2/20
2049
.39
118
CONS
OLID
ATED
ELEC
TRIC
ALDI
STRI
BUTO
RS,I
NC.
0949
5556
3242
456/
2/20
2034
.58
2486
CORI
NNE
SCHU
MAC
HER
SCHU
MAC
HER
BOD
05/2
042
466/
2/20
2021
3.21
2486
CORI
NNE
SCHU
MAC
HER
SCHU
MAC
HER
PFC
05/2
042
476/
2/20
2021
3.21
1520
DGS
OFS
SERV
ICE
REVO
LVIN
GFU
ND14
1845
942
486/
2/20
2041
,806
.08
2182
DSSE
RVIC
ESOF
AMER
ICA
INC
1394
9775
0515
2042
496/
2/20
2038
4.95
1722
ELAI
NESU
LLIV
ANSU
LLIV
ANBO
D05
/20
4250
6/2/
2020
213.
2117
22EL
AINE
SULL
IVAN
SULL
IVAN
PFC
05/2
042
506/
2/20
2021
3.21
208
ELEC
TRIC
ALSA
LES
INC.
0542
0803
4251
6/2/
2020
195.
3020
8EL
ECTR
ICAL
SALE
SIN
C.05
6883
0242
516/
2/20
2019
2.87
208
ELEC
TRIC
ALSA
LES
INC
0568
8304
4251
6/2/
2020
219.
7623
58EN
TERP
RISE
AUTO
MAT
ION
7883
4252
6/2/
2020
5,24
3.75
1430
ENTE
RPRI
SEIN
DUST
RIAL
SUPP
LYIN
C66
545
4253
6/2/
2020
980.
3414
30EN
TERP
RISE
INDU
STRI
ALSU
PPLY
INC
6655
842
536/
2/20
203,
059.
6814
30EN
TERP
RISE
INDU
STRI
ALSU
PPLY
INC
6652
342
536/
2/20
201,
995.
7921
9EN
VIRO
NMEN
TALR
ESOU
RCE
ASSO
CIAT
ES93
8846
4254
6/2/
2020
2,11
9.58
221
ESCO
NDID
OM
ETAL
SUPP
LY73
7917
4255
6/2/
2020
1,33
6.10
2320
FINA
LTOU
CHLA
NDSC
APIN
G16
842
566/
2/20
203,
500.
0023
20FI
NALT
OUCH
LAND
SCAP
ING
169
4256
6/2/
2020
1,88
0.00
240
FISH
ERSC
IENT
IFIC
8706
452
4257
6/2/
2020
860.
8124
0FI
SHER
SCIE
NTIF
IC91
4757
542
576/
2/20
2049
4.58
268
GRAI
NGER
INC
9526
3080
0342
586/
2/20
2024
.22
LAND
SCAP
ING
SERV
ICES
LAND
SCAP
ING
SERV
ICES
LAB
SUPP
LIES
EQUI
PMEN
TPH
REPL
ACEM
ENT
PROB
ESGE
NERA
LPLA
NTRE
PAIR
PART
S
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESHE
ATLO
OPPU
MP
MOT
ORIN
VENT
ORY
MOT
ORFO
ULAI
RIN
VENT
ORY
BEAR
INGS
FOR
CENT
FEED
PUM
PLA
BSU
PPLI
ESER
AQ
CSE
COND
ARIE
SEF
FLUE
NTPU
MP
REHA
BILI
TATI
ON
PFC
MEE
TING
05/1
2/20
AERA
TION
PROJ
ECT
PIPI
NG&
ELEC
TRIC
ALRE
PAIR
PIPI
NG&
ELEC
TRIC
ALRE
PAIR
TASK
ORDE
RNO
.17
SCAD
ADE
SIGN
SUPP
ORT
ONNE
TWOR
KIM
PROV
EMEN
TSPR
OJEC
TDE
SIGN
BOD
MEE
TING
05/2
7/20
PFC
MEE
TING
05/1
2/20
NATU
RALG
ASAP
RIL
FY20
20DR
INKI
NGW
ATER
SERV
ICES
BOD
MEE
TING
05/2
7/20
CIP
PLAN
TSE
CURI
TYCA
MER
ASSE
RVER
SCI
PPL
ANT
SECU
RITY
CAM
ERAS
SERV
ERS
PIPI
NGAN
DEL
ECTR
ICAL
REPA
IRPI
PING
AND
ELEC
TRIC
ALRE
PAIR
PIPI
NGAN
DEL
ECTR
ICAL
REPA
IR
INFO
RMAT
ION
SYST
EMS
POCK
ETTH
ERM
ALCA
MER
AIN
FORM
ATIO
NSY
STEM
SGR
APHI
CCA
RDCI
PHO
STSE
RVER
REPL
ACEM
ENT
INFO
RMAT
ION
SYST
EMS
IPAD
AND
APPL
EPE
NCIL
INFO
RMAT
ION
SYST
EMS
IPAD
AND
APPL
EPE
NCIL
INFO
RMAT
ION
SYST
EMS
HARD
WAR
EIN
FORM
ATIO
NSY
STEM
SBA
TTER
IES
AND
CHAN
GING
MOD
INFO
RMAT
ION
SYST
EMS
HARD
WAR
EIN
FORM
ATIO
NSY
STEM
SSO
FTW
ARE
WAT
CHGU
ARD
FIRE
BOX
INFO
RMAT
ION
SYST
EMS
CANO
NSC
ANNE
R
COGE
NBL
DGST
RUCT
URAL
REPA
IRPR
OJEC
TES
DC&
CMBO
DM
EETI
NG05
/27/
20PF
CM
EETI
NG05
/20/
20SC
ADA
NETW
ORK
INFR
ASTR
UCTU
REIM
PROV
EMEN
TSPR
OJEC
TPH
ASE
1ES
DCPI
PING
AND
ELEC
TRIC
ALRE
PAIR
SURG
EPR
OTEC
TOR
LAND
OUTF
ALLR
EPAI
RPR
OJEC
TES
DCSI
MUL
TANE
OUS
CLAS
SA/
BLO
ADOU
TFY
2020
ASNE
EDED
CONS
TRUC
TABI
LITY
REVI
EWOR
F1FA
NRE
PLAC
EMEN
TEV
ALUA
TION
UPDA
TERE
VENU
EAN
DFI
NANC
IALP
ROGR
AM
FY20
20FE
RRIC
CHLO
RIDE
EQUA
LIZA
TION
BASI
NSE
TTLE
MEN
TEQ
UALI
ZATI
ONBA
SIN
SETT
LEM
ENT
ODOR
CONT
ROLM
ASTE
RPL
ANEN
GINE
ERIN
GSE
RVIC
ESCO
GEN
BLDG
.STR
UCTU
RALR
EPAI
RPR
OJEC
TES
DC&
CM
SPEC
IALT
YSE
RVIC
ESNO
RTH
BARN
DOOR
REPA
IRIN
VENT
ORY
PLAT
EIN
VENT
ORY
REST
OCK
FY20
20FE
RRIC
CHLO
RIDE
FY20
20FE
RRIC
CHLO
RIDE
PAR
INST
ALLA
TION
OFSE
CURI
TYCA
MER
ASSP
ECIA
LTY
SERV
ICES
CIP
CONV
EYOR
INVE
NTOR
YBU
CKET
ELEV
ATOR
BELT
INVE
NTOR
Y
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
JETT
ING
SERV
ICES
BOD
MEE
TING
05/2
7/20
PFC
MEE
TING
05/1
2/20
9-20
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
268
GRAI
NGER
INC
9529
4247
9942
586/
2/20
2035
.20
268
GRAI
NGER
INC
9531
7329
6542
586/
2/20
2014
9.25
268
GRAI
NGER
INC
9537
7850
7442
586/
2/20
2036
6.43
268
GRAI
NGER
INC
9538
1801
4342
586/
2/20
2025
1.76
710
HARO
LDJM
ARTI
NM
ARTI
NBO
D05
/20
4259
6/2/
2020
213.
2171
0HA
ROLD
JMAR
TIN
MAR
TIN
PFC
05/2
042
596/
2/20
2021
3.21
275
HARD
YDI
AGNO
STIC
S23
1302
142
606/
2/20
2085
.49
275
HARD
YDI
AGNO
STIC
S23
1380
042
606/
2/20
2035
.96
298
IDEX
XLA
BORA
TORI
ESIN
C30
6416
5008
4262
6/2/
2020
766.
8429
8ID
EXX
LABO
RATO
RIES
INC
3064
3436
3542
626/
2/20
202,
748.
8912
42JO
SEPH
MIC
HAEL
MOS
CAM
OSCA
PFC
05/2
042
636/
2/20
2021
3.21
1242
JOSE
PHM
ICHA
ELM
OSCA
MOS
CABO
D05
/20
4263
6/2/
2020
213.
2117
23JU
DYRI
TTER
RITT
ERBO
D05
/20
4264
6/2/
2020
213.
2117
23JU
DYRI
TTER
RITT
ERCI
C05
/20
4264
6/2/
2020
213.
2131
9JW
CEN
VIRO
NMEN
TALI
NC.
1021
3742
656/
2/20
2013
,189
.96
1724
KEIT
HBL
ACKB
URN
BLAC
KBUR
NBO
D05
/20
4266
6/2/
2020
213.
2117
24KE
ITH
BLAC
KBUR
NBL
ACKB
URN
CIC
05/2
042
666/
2/20
2021
3.21
1873
SKYH
AWK
INDU
STRI
ESIN
C28
825
4267
6/2/
2020
143.
2523
23M
A LLO
RYSA
FETY
AND
SUPP
LYLL
C48
4580
542
686/
2/20
2011
1.25
299
MAT
HESO
NTR
IGAS
2168
7076
4269
6/2/
2020
620.
2529
9M
ATHE
SON
TRIG
AS21
7055
4242
696/
2/20
2066
9.25
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
3342
1242
706/
2/20
2013
4.29
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
3493
9042
706/
2/20
2033
1.20
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
4038
7142
706/
2/20
2067
8.16
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
4093
3942
706/
2/20
2073
2.14
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
4851
8042
706/
2/20
2023
.98
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
6215
4942
706/
2/20
2020
4.82
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
6786
0742
706/
2/20
2079
4.18
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
6899
8142
706/
2/20
2023
5.53
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
8132
9042
706/
2/20
2095
3.28
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
8255
3942
706/
2/20
2022
9.44
372
MCM
ASTE
RCA
RRSU
PPLY
CO39
8965
4442
706/
2/20
201,
446.
2837
2M
CMAS
TER
CARR
SUPP
LYCO
3996
1686
4270
6/2/
2020
223.
8012
98ON
ESOU
RCE
DIST
RIBU
TORS
LLC
S642
3831
.003
4273
6/2/
2020
3,60
4.50
1298
ONES
OURC
EDI
STRI
BUTO
RSLL
CS6
4378
28.0
0242
736/
2/20
2023
.09
1298
ONES
OURC
EDI
STRI
BUTO
RSLL
CS6
4419
05.0
0142
736/
2/20
201,
394.
7212
98ON
ESOU
RCE
DIST
RIBU
TORS
LLC
S644
7437
.001
4273
6/2/
2020
424.
3312
98ON
ESOU
RCE
DIST
RIBU
TORS
LLC
S645
3344
.001
4273
6/2/
2020
12,2
78.1
045
3PO
LYDY
NEIN
C14
5427
342
746/
2/20
2048
,754
.72
1432
PROC
OPIO
CORY
HARG
REAV
ES&
SAVI
TCH
LLP
7137
7842
756/
2/20
202,
242.
5014
32PR
OCOP
IOCO
RYHA
RGRE
AVES
&SA
VITC
HLL
P71
3779
4275
6/2/
2020
3,43
2.00
1432
PROC
OPIO
CORY
HARG
REAV
ES&
SAVI
TCH
LLP
7137
8042
756/
2/20
207,
466.
5025
13SE
PARA
TION
PROC
ESS,
INC.
9754
4276
6/2/
2020
612.
0015
09TI
MBE
RLIN
EEN
GINE
ERIN
G,IN
C.82
01.0
914
4277
6/2/
2020
8,11
2.50
1509
TIM
BERL
INE
ENGI
NEER
ING,
INC.
8201
.11
0742
776/
2/20
205,
087.
5015
09TI
MBE
RLIN
EEN
GINE
ERIN
G,IN
C.82
01.1
204
4277
6/2/
2020
4,67
5.00
1509
TIM
BERL
INE
ENGI
NEER
ING,
INC.
8201
.13
0442
776/
2/20
2012
,650
.00
2392
UNIV
ARUS
AIN
C48
5845
8042
786/
2/20
201,
704.
6123
92UN
IVAR
USA
INC
4858
4581
4278
6/2/
2020
950.
3623
92UN
IVAR
USA
INC
4858
4582
4278
6/2/
2020
862.
0018
74HD
SUPP
LYFA
CILI
TIES
MAI
NTEN
ANCE
LTD
2386
2242
796/
2/20
2087
5.36
21AI
RGAS
USA
LLC
9101
1303
0018
9074
6/2/
2020
1,85
9.88
2532
ALGA
ESO
LUTI
ONS
2578
9218
9075
6/2/
2020
9,03
7.69
1718
ALLA
NJU
LIUS
SEN
JULI
USSE
NBO
D05
/20
1890
766/
2/20
2021
3.21
1718
ALLA
NJU
LIUS
SEN
JULI
USSE
NCI
C05
/20
1890
766/
2/20
2021
3.21
1718
ALLA
NJU
LIUS
SEN
JULI
USSE
NAG
E04
/20
1890
766/
2/20
2021
3.21
1718
ALLA
NJU
LIUS
SEN
JULI
USSE
NAG
E05
/20
1890
766/
2/20
2021
3.21
951
ANAL
YTIC
ALTE
CHNO
LOGY
INC
4260
2618
9077
6/2/
2020
1,42
2.79
803
APPL
IED
INDU
STRI
ALTE
CHNO
LOGI
ES70
1890
0021
1890
786/
2/20
2051
0.37
925
ARAM
ARK
UNIF
ORM
&CA
REER
APPA
REL
1451
2940
6718
9079
6/2/
2020
435.
8792
5AR
AMAR
KUN
IFOR
M&
CARE
ERAP
PARE
L14
5130
4870
1890
796/
2/20
2055
5.23
925
ARAM
ARK
UNIF
ORM
&CA
REER
APPA
REL
1451
3158
6818
9079
6/2/
2020
448.
4392
5AR
AMAR
KUN
IFOR
M&
C ARE
ERAP
PARE
L14
5132
6585
1890
796/
2/20
2052
0.68
FY20
20UN
IFOR
MRE
NTAL
AND
CLEA
NING
FY20
20UN
IFOR
MRE
NTAL
AND
CLEA
NING
FY20
20UN
IFOR
MRE
NTAL
AND
CLEA
NING
AGEN
DARE
VIEW
04/2
1/20
AGEN
DARE
VIEW
05/2
6/20
MIN
ORRE
HABI
LITA
TION
CWRF
CHLO
RINE
MET
ERPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
FY20
20UN
IFOR
MRE
NTAL
AND
CLEA
NING
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESSA
FETY
EQUI
PMEN
TPR
OTEC
TIVE
CLOT
HING
CIP
IDCA
RDPR
INTE
RBO
DM
EETI
NG05
/27/
20CI
CM
EETI
NG05
/20/
20
TASK
ORDE
RNO
.12
DIGE
STER
IMPR
OVEM
ENT
FINA
LDES
IGN
TASK
ORDE
RNO
.13
NETW
ORK
IMPR
OVEM
ENTS
PHAS
E1
PROJ
ECT
CHEM
ICAL
SCI
TRIC
ACID
FOR
CWRF
CHEM
ICAL
SCA
USTI
CFO
RCW
RFCH
EMIC
ALS
SODI
UMBI
SULF
ATE
FOR
CWRF
LEGA
LSER
VICE
SLE
GALS
ERVI
CES
CWRF
RECY
CLE
WAT
ERST
ORAG
EBA
SIN
TASK
ORDE
RNO
.9PR
IMAR
IES
ELEC
TRIC
ALEN
GINE
ERIN
GAN
DSC
ADA
SUPP
ORT
TASK
ORDE
RNO
.11
FY20
20AS
NEED
EDEN
GINE
ERIN
GSE
RVIC
ES
DRYE
RBL
DLI
GHTI
NGRE
PLAC
EM
CCBU
CKET
TIM
ERPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
MIN
ORRE
HABI
LITA
TION
SYST
EMS
FY20
20SL
UDGE
DEW
ATER
ING
POLY
MER
LEGA
LSER
VICE
S
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
TURB
OCO
OLAN
TLI
NES
SAFE
TYSU
PPLI
ESCI
PDR
YER
CORR
ECTI
VEM
AINT
ENAN
CEPI
PING
&EL
ECTR
ICAL
REPA
IR
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESPL
ANNE
DM
AINT
ENAN
CECW
RFUF
SYST
EMCO
GEN
SUPP
LIES
PLAN
NED
MAI
NTEN
ANCE
CWRF
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESTR
ANSF
ERHO
SEFO
RFO
G
FY20
20LI
QUI
DNI
TROG
ENPI
PING
AND
ELEC
TRIC
ALRE
PAIR
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESHO
SE
BOD
MEE
TING
05/2
7/20
CIC
MEE
TING
05/2
0/20
PFC
AGEN
DADE
LIVE
RIES
SAFE
TYEQ
UIPM
ENT
FY20
20LI
QUI
DNI
TROG
EN
PFC
MEE
TING
05/1
2/20
BOD
MEE
TING
05/2
7/20
BOD
MEE
TING
05/2
7/20
CIC
MEE
TING
05/2
0/20
INVE
NTOR
YPR
IMAR
YGR
INDE
R&
REDU
CER
PFC
MEE
TING
05/1
2/20
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
COLI
LERT
REAG
ENT
SAFE
TYEQ
UIPM
ENT
SPEC
IALT
YEQ
UIPM
ENT
SAFE
TYEQ
UIPM
ENT
JANI
TORI
ALSU
PPLI
ESBO
DM
EETI
NG05
/27/
20
9-21
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
2056
ARIZ
ONA
DEPA
RTM
ENT
OFAG
RICU
LTUR
EFY
2067
6218
9080
6/2/
2020
175.
0047
ASBU
RYEN
VIRO
NMEN
TALS
ERVI
CES
I500
0056
0589
1890
816/
2/20
2022
7.80
107
CALT
ROLI
NCCD
9910
3133
1890
826/
2/20
2046
2.24
112
CITY
OFCA
RLSB
AD05
0026
0000
04/2
018
9083
6/2/
2020
987.
5311
2CI
TYOF
CARL
SBAD
0111
8100
0004
/20
1890
836/
2/20
2064
.87
1459
SUNB
ELT
RENT
ALS
INC
1012
4527
900
0118
9084
6/2/
2020
737.
3015
14DE
NALI
WAT
ERSO
LUTI
ONS
LLC
0027
059
IN18
9085
6/2/
2020
5,08
4.61
1514
DENA
LIW
ATER
SOLU
TION
SLL
C00
2706
0IN
1890
856/
2/20
208,
514.
0115
14DE
NALI
WAT
ERSO
LUTI
ONS
LLC
0027
061
IN18
9085
6/2/
2020
1,26
9.99
1955
DFK
SOLU
TION
SGR
OUP
LLC
1513
318
9086
6/2/
2020
2,25
0.00
1882
DIRE
CTV
3745
3080
123
1890
876/
2/20
2010
3.99
229
FEDE
RALE
XPRE
SSCO
RP7
012
3841
418
9088
6/2/
2020
149.
1325
1FR
ONTI
ERFE
NCE
CORP
0596
4018
9089
6/2/
2020
1,50
0.00
283
HOM
EDE
POT
CRED
ITSE
RVIC
ES31
7041
818
9090
6/2/
2020
54.0
428
3HO
ME
DEPO
TCR
EDIT
SERV
ICES
6170
372
1890
906/
2/20
2054
.83
2028
JIMHE
RNAN
DEZ
HERN
ANDE
ZCI
C05
/20
1890
916/
2/20
2021
3.21
2028
JIMHE
RNAN
DEZ
HERN
ANDE
ZBO
D05
/20
1890
916/
2/20
2021
3.21
1924
JOHN
FETU
FETU
REIM
B05
/20
1890
926/
2/20
2043
7.87
234
JRFI
LANC
CONS
TRUC
TION
COM
PANY
INC
505
/20
1890
936/
2/20
2068
,287
.32
325
KENN
EDY
JENK
SCO
NSUL
TING
1380
3518
9094
6/2/
2020
37,3
10.5
832
5KE
NNED
YJE
NKS
CONS
ULTI
NG13
8643
1890
946/
2/20
2053
,093
.89
325
KENN
EDY
JENK
SCO
NSUL
TING
1386
4418
9094
6/2/
2020
9,11
1.00
325
KENN
EDY
JENK
SCO
NSUL
TING
1386
4518
9094
6/2/
2020
20,9
27.8
032
5KE
NNED
YJE
NKS
CONS
ULTI
NG13
8728
1890
946/
2/20
208,
146.
2514
45LO
WVO
LTAG
EIN
TEGR
ATED
SYST
EMS
3769
718
9096
6/2/
2020
210.
0070
6M
AGSY
STEM
SIN
C24
017
6031
1890
976/
2/20
2021
4.40
706
MAG
SYST
EMS
INC
2403
260
3318
9097
6/2/
2020
171.
3012
82M
ICRO
MOT
ION
INC
4059
0534
1890
996/
2/20
202,
542.
2616
30M
INE
SAFE
TYAP
PLIA
NCES
COM
PANY
9610
5216
118
9100
6/2/
2020
707.
8625
18M
OUSE
REL
ECTR
ONIC
S,IN
C.56
7346
1618
9101
6/2/
2020
807.
2323
63NA
UMAN
NHO
BBS
MAT
ERIA
LHAN
DLIN
GFS
6011
1884
1891
026/
2/20
2051
8.40
417
OFFI
CEDE
POT
INC
4903
8036
3001
1891
036/
2/20
2055
2.62
417
OFFI
CEDE
POT
INC
4903
8072
3001
1891
036/
2/20
2024
.13
417
OFFI
CEDE
POT
INC
4916
9173
9001
1891
036/
2/20
2021
8.81
417
OFFI
CEDE
POT
INC
4916
9234
5001
1891
036/
2/20
2034
.47
2075
OLIN
CORP
ORAT
ION
2825
519
1891
046/
2/20
203,
904.
0820
75OL
INCO
RPOR
ATIO
N28
2759
618
9104
6/2/
2020
3,85
5.98
2075
OLIN
CORP
ORAT
ION
2828
623
1891
046/
2/20
203,
678.
0120
75OL
INCO
RPOR
ATIO
N28
3027
118
9104
6/2/
2020
3,92
4.92
2075
OLIN
CORP
ORAT
ION
2832
200
1891
046/
2/20
203,
965.
0123
78Q
UALI
TYSE
CURI
TYSE
RVIC
ES54
334
1891
056/
2/20
2054
6.44
1818
ROCK
WEL
LENG
INEE
RING
&EQ
UIPM
ENT
1889
518
9106
6/2/
2020
25,9
87.6
214
07JO
ESA
LLAY
SALL
AYED
REIM
4/20
418
9107
6/2/
2020
70.0
060
5SA
NDI
EGO
GAS
&EL
ECTR
IC95
7505
/20
1891
086/
2/20
2094
,243
.21
605
SAN
DIEG
OGA
S&
ELEC
TRIC
6192
05/2
018
9108
6/2/
2020
624.
6860
5SA
NDI
EGO
GAS
&EL
ECTR
IC46
1605
/20
1891
086/
2/20
207,
574.
7660
5SA
NDI
EGO
GAS
&EL
ECTR
IC87
4705
/20
1891
086/
2/20
209,
554.
3360
5SA
NDI
EGO
GAS
&EL
ECTR
IC20
5505
/20
1891
086/
2/20
2011
.84
605
SAN
DIEG
OGA
S&
ELEC
TRIC
2781
05/2
018
9108
6/2/
2020
31,3
66.3
260
5SA
NDI
EGO
GAS
&EL
ECTR
IC13
1905
/20
1891
086/
2/20
203,
052.
0619
29SI
EMEN
SIN
DUST
RIES
5604
3661
5918
9109
6/2/
2020
6,51
0.26
1929
SIEM
ENS
INDU
STRI
ES56
0436
8064
1891
096/
2/20
2010
,783
.62
1849
SOUT
HERN
COUN
TIES
LUBR
ICAN
TS,L
LC82
0572
1891
106/
2/20
204,
284.
1452
1SW
RCB
DZW
IGAL
SKIG
R120
1891
116/
2/20
2015
0.00
521
SWRC
BJO
HNSO
NGR
II20
1891
116/
2/20
2015
0.00
184
TEST
AMER
ICA
LABO
RATO
RIES
INC
4400
0393
5518
9112
6/2/
2020
27.5
055
9VA
LIN
CORP
ORAT
ION
3434
267
1891
146/
2/20
201,
242.
2520
50VE
RIZO
NW
IREL
ESS
9854
3144
0718
9115
6/2/
2020
125.
1022
37W
ILLI
AMSV
ECSV
ECRE
IMB
05/2
018
9116
6/2/
2020
86.1
5$9
47,2
67.9
315
30CA
LPER
SHE
ALTH
1000
0001
6044
812
4240
6/2/
2020
83,4
96.8
017
16IC
MA
#303
941
5076
642
616/
2/20
2030
.20
1716
ICM
A#3
0394
150
767
4261
6/2/
2020
32,1
44.0
9Pa
yrol
lRun
2W
arra
nt06
0320
Payr
ollR
un1
War
rant
0603
20
CWRF
MIN
ORRE
HABI
LITA
TION
TRAI
NAI
RCO
RDRE
PAIR
SFY
2020
TELE
PHON
EW
IREL
ESS
LAB
SUPP
LIES
HEAL
THIN
SURA
NCE
PREM
IUM
SJU
NE
FUEL
AND
LUBE
ENGI
NEOI
LCE
RTIF
ICAT
ION
CERT
IFIC
ATIO
NOU
TSID
ELA
BAN
ALYS
ISEW
AEF
FLUE
NT
ELEC
TRIC
ITY
AHPS
ELEC
TRIC
ITY
BVPS
ELEC
TRIC
ITY
AHPS
CIP
BUBB
LER
REPL
ACEM
ENT
SECO
NDAR
YSC
UMPI
TCI
PBU
BBLE
RRE
PLAC
EMEN
TSE
COND
ARY
SCUM
PIT
TUIT
ION
REIM
BURS
EMEN
TEL
ECTR
ICIT
YEW
PCF
ELEC
TRIC
ITY
CWRF
ELEC
TRIC
ITY
CWRF
ELEC
TRIC
ITY
AHPS
FY20
20SO
DIUM
HYPO
CHLO
RITE
FY20
20SO
DIUM
HYPO
CHLO
RITE
FY20
20SO
DIUM
HYPO
CHLO
RITE
SPEC
IALT
YSE
RVIC
ESPR
IMAR
IES
REPL
ACE
PRIM
ARY
SLUD
GEPU
MP
MIS
CELL
ANEO
USOF
FICE
SUPP
LIES
MIS
CELL
ANEO
USOF
FICE
SUPP
LIES
MIS
CELL
ANEO
USOF
FICE
SUPP
LIES
FY20
20SO
DIUM
HYPO
CHLO
RITE
FY20
20SO
DIUM
HYPO
CHLO
RITE
CIP
2WFL
OWCO
NTRO
LVAL
VERE
PLAC
EMEN
TPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
INFO
RMAT
ION
SYST
EMS
HARD
WAR
EM
OBIL
EEQ
UIPM
ENT
REPA
IRSC
ISSO
RLI
FTRE
PAIR
MIS
CELL
ANEO
USOF
FICE
SUPP
LIES
TASK
ORDE
RNO
.4NE
TWOR
KIM
PROV
EMEN
TSPH
ASE
1PR
OJEC
TCM
SFY
2021
RCA
MP
UPDA
TESP
ECIA
LTY
SERV
ICES
SAFE
TYSU
PPLI
ESSA
FETY
SUPP
LIES
JANI
TORI
ALSU
PPLI
ESTA
SKOR
DER
NO.1
COGE
NST
RUCT
URAL
REPA
IRSH
ORIN
GSY
STEM
INST
ALLA
TION
FY20
21R
CAM
PUP
DATE
TASK
ORDE
RNO
.1PR
IMAR
YAR
EAIM
PROV
EMEN
TSCM
STA
SKOR
DER
NO.3
DIGE
STER
CLEA
NING
&CO
ATIN
GPR
OJEC
TCM
S
SPEC
IALT
YSE
RVIC
ESPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESCI
CM
EETI
NG05
/20/
20BO
DM
EETI
NG05
/27/
20
FY20
20BI
OSOL
IDS
HAUL
ING
AND
HAND
LING
SERV
ICES
FY20
20BI
OSOL
IDS
HAUL
ING
AND
HAND
LING
SERV
ICES
SAFE
TYCO
VID
19EX
POSU
RECO
NTRO
LPLA
NFY
2020
DIRE
CTV
SERV
ICES
EFFL
UENT
TEST
ING
PIPI
NGAN
DEL
ECTR
ICAL
REPA
IRFY
2020
POTA
BLE
WAT
ERFY
2020
POTA
BLE
WAT
EREQ
UIPM
ENT
RENT
ALFY
2020
BIOS
OLID
SHA
ULIN
GAN
DHA
NDLI
NGSE
RVIC
ES
PERM
ITS
SPEC
IALT
YSE
RVIC
ES
9-22
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
1716
ICM
A#3
0394
150
770
4261
6/2/
2020
10,9
10.7
323
07M
UTUA
LOF
OMAH
A00
1080
1748
9642
716/
2/20
207,
787.
8723
07M
UTUA
LOF
OMAH
A00
1088
0839
2942
716/
2/20
207,
787.
8717
17NA
TION
WID
E#0
0409
9900
150
768
4272
6/2/
2020
3,88
2.61
2276
LEGA
LSHI
ELD
0147
531
05/2
018
9095
6/2/
2020
33.9
021
02M
ESVI
SION
2012
9295
0501
1890
986/
2/20
2089
2.17
2131
UNIT
EDCO
NCOR
DIA
DENT
ALPL
ANS
OFCA
1550
0132
818
9113
6/2/
2020
4,93
8.40
$151
,904
.64
13AD
SEN
VIRO
NMEN
TALS
ERVI
CES
2209
1.22
0520
4280
6/17
/202
010
,788
.71
411
AJIL
ON11
3601
6742
816/
17/2
020
998.
4022
14AM
ANDA
YOUN
GRI
GBY
RIGB
YPF
C06
/20
4282
6/17
/202
021
3.21
2254
AMER
ICAN
SECU
RITY
GROU
P26
734
4283
6/17
/202
03,
394.
4822
54AM
ERIC
ANSE
CURI
TYGR
OUP
2673
542
836/
17/2
020
3,49
4.48
2254
AMER
ICAN
SECU
RITY
GROU
P26
737
4283
6/17
/202
02,
778.
8717
59AM
ETEK
ARIZ
ONA
INST
RUM
ENT,
LLC
A000
0035
3594
4284
6/17
/202
049
5.65
2436
AZTE
CLE
ASIN
G,IN
CIN
1689
642
856/
17/2
020
937.
0910
06BA
KER
ELEC
TRIC
,INC
2054
742
866/
17/2
020
15,5
06.2
891
BROW
N&
CALD
WEL
L44
3731
6642
876/
17/2
020
27,9
93.5
013
64CA
LIFO
RNIA
WAT
ERTE
CHNO
LOGI
ES37
572
4288
6/17
/202
06,
535.
4613
64CA
LIFO
RNIA
WAT
ERTE
CHNO
LOGI
ES37
519
4288
6/17
/202
06,
276.
5317
96CA
R OLL
OEN
GINE
ERS,
INC.
0187
160
4289
6/17
/202
049
,806
.60
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8770
242
896/
17/2
020
2,17
0.00
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8770
342
896/
17/2
020
30,3
20.0
023
11CD
MSM
ITH
9010
0788
4290
6/17
/202
012
,680
.00
2311
CDM
SMIT
H90
0991
7742
916/
17/2
020
29,3
62.8
814
40CD
WGO
VERN
MEN
TXW
S629
742
926/
17/2
020
3,64
4.35
1440
CDW
GOVE
RNM
ENT
XXC9
162
4292
6/17
/202
07,
135.
7814
40CD
WGO
VERN
MEN
TXX
D206
942
926/
17/2
020
237.
2414
40CD
WGO
VERN
MEN
TXZ
H186
842
926/
17/2
020
4,54
4.45
1440
CDW
GOVE
RNM
ENT
XZK9
517
4292
6/17
/202
01,
073.
4314
40CD
WGO
VERN
MEN
TXZ
L308
042
926/
17/2
020
1,76
8.92
1440
CDW
GOVE
RNM
ENT
XZL5
950
4292
6/17
/202
032
9.86
1440
CDW
GOVE
RNM
ENT
XZR6
387
4292
6/17
/202
069
5.00
1440
CDW
GOVE
RNM
ENT
XZS0
073
4292
6/17
/202
02,
260.
6714
40CD
WGO
VERN
MEN
TXZ
S117
842
926/
17/2
020
342.
6314
40CD
WGO
VERN
MEN
TXZ
S118
642
926/
17/2
020
1,01
9.76
1440
CDW
GOVE
RNM
ENT
XZZ3
225
4292
6/17
/202
02,
427.
5814
40CD
WGO
VERN
MEN
TZB
G430
442
926/
17/2
020
91.3
514
40CD
WGO
VERN
MEN
TZB
H194
842
926/
17/2
020
309.
9214
40CD
WGO
VERN
MEN
TZB
N519
542
926/
17/2
020
4,48
1.82
1440
CDW
GOVE
RNM
ENT
ZBT8
429
4292
6/17
/202
057
5.49
1440
CDW
GOVE
RNM
ENT
ZBV7
579
4292
6/17
/202
02,
427.
5814
40CD
WGO
VERN
MEN
TZC
B626
842
926/
17/2
020
487.
9414
40CD
WGO
VERN
MEN
TXW
C429
042
926/
17/2
020
9,45
3.24
1440
CDW
GOVE
RNM
ENT
ZCL6
670
4292
6/17
/202
089
7.67
1440
CDW
GOVE
RNM
ENT
XTZ6
325
4292
6/17
/202
026
4.80
1440
CDW
GOVE
RNM
ENT
WZH
9228
4292
6/17
/202
059
.64
1440
CDW
GOVE
RNM
ENT
XDB2
085
4292
6/17
/202
093
9.38
1440
CDW
GOVE
RNM
ENT
XHC5
284
4292
6/17
/202
01,
419.
9614
40CD
WGO
VERN
MEN
TXM
R455
842
926/
17/2
020
910.
9724
86CO
RINN
ESC
H UM
ACHE
RSC
HUM
ACHE
RPF
C06
/20
4294
6/17
/202
021
3.21
1850
COX
COM
MUN
ICAT
IONS
INC
0113
1101
1377
6701
0620
4295
6/17
/202
01,
550.
0017
22EL
AINE
SULL
IVAN
SULL
IVAN
PFC
06/2
042
966/
17/2
020
213.
2123
58EN
TERP
RISE
AUTO
MAT
ION
7910
4297
6/17
/202
02,
877.
5023
58EN
TERP
RISE
AUTO
MAT
ION
7911
4297
6/17
/202
04,
557.
5023
58EN
TERP
RISE
AUTO
MAT
ION
7912
4297
6/17
/202
02,
981.
2523
58EN
TERP
RISE
AUTO
MAT
ION
7913
4297
6/17
/202
08,
480.
0023
58EN
TERP
RISE
AUTO
MAT
ION
7931
4297
6/17
/202
032
,682
.30
1430
ENTE
RPRI
SEIN
DUST
RIAL
SUPP
LYIN
C66
529
4298
6/17
/202
01,
549.
7114
30EN
TERP
RISE
INDU
STRI
ALSU
PPLY
INC
6664
442
986/
17/2
020
419.
2610
11EN
VIRO
NMEN
TALE
XPRE
SS10
0060
2784
4299
6/17
/202
032
2.77
1011
ENVI
RONM
ENTA
LEXP
RESS
1000
6035
3742
996/
17/2
020
273.
9610
11EN
VIRO
NMEN
TALE
XPRE
SS10
0060
3673
4299
6/17
/202
043
1.82
DAF
REPL
ACE
HOSE
SLA
BSU
PPLI
ESLA
BSU
PPLI
ESLA
BSU
PPLI
ES
TASK
ORDE
RNO
.18
FY20
20IN
TEGR
ATIO
NSE
RVIC
ESAN
NUAL
STA
SKOR
DER
NO.2
1SO
LIDS
THIC
KENI
NGPR
IMAR
YDE
SIGN
S UPP
ORT
TASK
ORDE
RNO
.23
SCAD
ASY
STEM
INTE
GRAT
ION
SERV
ICES
&HA
RDW
ARE
PROC
UREM
ENT
TASK
ORDE
RNO
.14
PRIM
ARIE
SSC
ADA
INTE
GRAT
ION
AND
PROG
RAM
MIN
GSE
RVIC
ESPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
DRUM
MOB
ILE
OIL
INFO
RMAT
ION
SYST
EMS
UPS
SMAR
TAP
PPF
CM
EETI
NG06
/09/
20FY
2020
INTE
RNET
SERV
ICE
PFC
MEE
TING
06/0
9/20
TASK
ORDE
RNO
.22
INTE
GRAT
ION
DESI
GNSE
RVIC
ESFO
RTH
EDI
GEST
ER
INFO
RMAT
ION
SYST
EMS
INFO
RMAT
ION
SYST
EMS
SOFT
WAR
EIN
FORM
ATIO
NSY
STEM
SHA
RDW
ARE
INFO
RMAT
ION
SYST
EMS
OPS
CONT
ROLP
RINT
ERIN
FORM
ATIO
NSY
STEM
SSO
FTW
ARE
AUTO
DESK
FUSI
ON
PLAN
TW
IDE
DOOR
CAM
ERA
MON
ITOR
SCI
PBO
ARD
ROOM
REHA
BILI
TATI
ONRB
PSM
INOR
REHA
BILI
TATI
ONUP
GRAD
EDO
ORSE
CURI
TYIN
FORM
ATIO
NSY
STEM
SSO
FTW
ARE
CIP
PLAN
TSE
CURI
TYCA
MER
ASSE
RVER
S
PLAN
TW
IDE
DOOR
CAM
ERA
MON
ITOR
SIN
FORM
ATIO
NSY
STEM
SSO
FTW
ARE
RBPS
MIN
ORRE
HABI
LITA
TION
UPGR
ADE
DOOR
SECU
RITY
RBPS
MI N
ORRE
HABI
LITA
TION
UPGR
ADE
DOOR
SECU
RITY
INFO
RMAT
ION
SYST
EMS
SOFT
WAR
E
INFO
RMAT
ION
SYST
EMS
CWRF
MON
ITOR
SIN
FORM
ATIO
NSY
STEM
SSO
FTW
ARE
COM
PUTE
RRE
PLAC
EMEN
TCI
PBO
ARD
ROOM
REHA
BILI
TATI
ONIN
FORM
ATIO
NSY
STEM
SSO
FTW
ARE
CISC
ONE
TWOR
KLI
CENS
ECI
PBO
ARD
ROOM
REHA
BILI
TATI
ON
DESI
GNBU
ILD
DOCU
MEN
TSFO
RSC
ADA
NETW
ORK
DESI
GNPR
OJEC
TIN
FORM
ATIO
NSY
STEM
SSO
FTW
ARE
SOFT
WAR
ERE
NEW
ALCI
PPL
ANT
SECU
RITY
CAM
ERAS
SERV
ERS
INFO
RMAT
ION
SYST
EMS
CIP
PLAN
TSE
CURI
TYCA
MER
ASSE
RVER
S
F Y20
20FE
RRIC
CHLO
RIDE
SOLI
DSTH
ICKE
NING
DESI
GNPR
OJEC
TEQ
UALI
ZATI
ONBA
SIN
SETT
LEM
ENT
EQUA
LIZA
TION
BASI
NSE
TTLE
MEN
TSC
ADA
NETW
ORK
INFR
ASTR
UCTU
REIM
PROV
EMEN
TSPR
OJEC
TPH
ASE
1ES
DC
SPEC
IALT
YSE
RVIC
ESSH
ARP
COPI
ERS
LEAS
ENE
MAP
PLIC
ATIO
NPR
OJEC
TDI
GEST
ERRE
HABI
LITA
TION
AND
IMPR
OVEM
ENTS
PROJ
ECT
FY20
20FE
RRIC
CHLO
RIDE
TEM
PORA
RYLA
BOR
RECE
PTIO
NIST
PFC
MEE
TING
06/0
9/20
BVPS
MIN
ORRE
HABI
LITA
TON
INST
ALLA
TION
OFSE
CURI
TYCA
MER
ASAH
PSM
INOR
REHA
BILI
TATO
NIN
STAL
LATI
ONOF
SECU
RITY
CAM
ERAS
INFO
RMAT
ION
SYST
EMS
NETW
ORK
CAM
ERA
Payr
ollR
un1
War
rant
0603
20LE
GALS
ERVI
CES
VISI
ONIN
SURA
NCE
PREM
IUM
SM
AY
ADS
FLOW
MET
ERIN
GSE
RVIC
ES
Payr
ollR
un2
War
rant
0527
20LI
FEIN
SURA
NCE
PREM
IUM
LIFE
INSU
RANC
EPR
EMIU
M
DENT
ALPR
EMIU
MJU
NE
9-23
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
219
ENVI
RONM
ENTA
LRES
OURC
EAS
SOCI
ATES
9393
7943
006/
17/2
020
207.
2521
9EN
VIRO
NMEN
TALR
ESOU
RCE
ASSO
CIAT
ES93
9457
4300
6/17
/202
065
3.96
2058
EVAN
TEC
CORP
ORAT
ION
2020
1775
4301
6/17
/202
068
1.67
2058
EVAN
TEC
CORP
ORAT
ION
2020
1969
4301
6/17
/202
017
6.23
240
FISH
ERSC
IENT
IFIC
0310
393
4302
6/17
/202
01,
585.
7924
0FI
SHER
SCIE
NTIF
IC04
2398
443
026/
17/2
020
49.6
724
0FI
SHER
SCIE
NTIF
IC01
1491
343
026/
17/2
020
848.
4524
0FI
SHER
SCIE
NTIF
IC01
9622
743
026/
17/2
020
14.4
024
0FI
SHER
SCIE
NTIF
IC00
4354
343
026/
17/2
020
39.9
724
0FI
SHER
SCIE
NTIF
IC94
1006
443
026/
17/2
020
139.
3824
0FI
SHER
SCIE
NTIF
IC94
6424
843
026/
17/2
020
229.
1024
0FI
SHER
SCIE
NTIF
IC95
1588
243
026/
17/2
020
1,78
3.57
240
FISH
ERSC
IENT
IFIC
9515
883
4302
6/17
/202
070
9.43
240
FISH
ERSC
IENT
IFIC
9303
273
4302
6/17
/202
017
8.60
240
FISH
ERSC
IENT
IFIC
9688
083
4302
6/17
/202
049
.67
240
FISH
ERSC
IENT
IFIC
9688
084
4302
6/17
/202
051
8.67
240
FISH
ERSC
IENT
IFIC
9688
086
4302
6/17
/202
037
9.80
240
FISH
ERSC
IENT
IFIC
9569
322
4302
6/17
/202
020
7.13
240
FISH
ERSC
IENT
IFIC
9569
323
4302
6/17
/202
025
8.60
240
FISH
ERSC
IENT
IFIC
9569
329
4302
6/17
/202
060
0.00
240
FISH
ERSC
IENT
IFIC
9961
793
4302
6/17
/202
014
3.96
240
FISH
ERSC
IENT
IFIC
9961
797
4302
6/17
/202
095
8.60
268
GRAI
NGER
INC
9546
1219
2343
036/
17/2
020
119.
5726
8GR
AING
ERIN
C95
3903
4992
4303
6/17
/202
016
8.09
268
GRAI
NGER
INC
9540
6534
0043
036/
17/2
020
23.0
426
8GR
AING
ERIN
C95
4117
3713
4303
6/17
/202
030
1.98
268
GRAI
NGER
INC
9545
5270
9643
036/
17/2
020
173.
1627
3HA
CHCO
MPA
NY11
9677
5543
046/
17/2
020
1,20
1.31
273
HACH
COM
PANY
1197
0176
4304
6/17
/202
028
8.55
273
HACH
COM
PANY
1197
1308
4304
6/17
/202
038
8.33
273
HACH
COM
PANY
1197
3726
4304
6/17
/202
070
3.46
273
HACH
COM
PANY
1197
5140
4304
6/17
/202
033
4.40
273
HACH
COM
P ANY
1197
5999
4304
6/17
/202
03,
200.
2227
3HA
CHCO
MPA
NY11
9781
2043
046/
17/2
020
313.
7971
0HA
ROLD
JMAR
TIN
MAR
TIN
PFC
06/2
043
056/
17/2
020
213.
2113
80HA
WTH
ORNE
POW
ERSY
STEM
SSS
1100
1203
3043
066/
17/2
020
351,
978.
8112
42JO
SEPH
MIC
HAEL
MOS
CAM
OSCA
PFC
06/2
043
096/
17/2
020
213.
2132
0KA
MAN
INDU
STRI
ALTE
CHCO
RPD4
5878
043
106/
17/2
020
411.
3429
9M
ATHE
SON
TRIG
AS21
7956
6643
116/
17/2
020
1,01
4.35
372
MCM
ASTE
RCA
RRSU
PPLY
CO40
5276
1543
126/
17/2
020
182.
4837
2M
CMAS
TER
CARR
SUPP
LYCO
4010
9981
4312
6/17
/202
010
1.57
372
MCM
ASTE
RCA
RRSU
PPLY
CO40
3255
3743
126/
17/2
020
2,18
8.79
1699
MIN
UTEM
ANPR
ESS
5627
843
136/
17/2
020
317.
8622
48M
WM
ECHA
NICA
LINC
1057
7522
4314
6/17
/202
02,
804.
0022
48M
WM
ECHA
NICA
LINC
1057
7590
4314
6/17
/202
033
8.02
2512
NEXI
NITE
LLC
INV
0004
6343
166/
17/2
020
19,2
75.0
012
98ON
ESOU
RCE
DIST
RIBU
TORS
LLC
S644
7732
.001
4317
6/17
/202
077
1.17
1298
ONES
OURC
EDI
STRI
BUTO
RSLL
CS6
4533
42.0
0143
176/
17/2
020
36,8
31.1
112
98ON
ESOU
RCE
DIST
RIBU
TORS
LLC
S645
3344
.002
4317
6/17
/202
03,
067.
2312
98ON
ESOU
RCE
DIST
RIBU
TORS
LLC
S645
4025
.001
4317
6/17
/202
026
3.29
2183
PAYN
EPE
STM
ANAG
EMEN
T23
1329
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
1378
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
0763
4318
6/17
/202
060
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
1115
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
1963
4318
6/17
/202
060
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
2127
4318
6/17
/202
017
9.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
2128
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
3230
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
3293
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
3349
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
3587
4318
6/17
/202
075
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
3949
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
4081
4318
6/17
/202
060
.00
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SEW
A
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SEW
AFY
2020
PEST
CONT
ROLS
ERVI
CES
EWA
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESRA
DIO
BATT
ERIE
SBV
PSM
INOR
REHA
BILI
TATI
ONLO
GIPR
OCES
SM
ODUL
EM
INOR
REHA
BILI
TATI
ONSY
STEM
SPI
PING
ELEC
TRIC
ALRE
PAIR
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
PLAN
NED
MAI
NTEN
ANCE
COGE
NERA
TION
SUPP
LIES
PRIN
TING
AND
REPR
ODUC
TION
SPEC
IALT
YSE
RVIC
ESSP
ECIA
LTY
SERV
ICES
DOCU
MEN
TM
ANAG
EMEN
TSE
RVIC
ES
PFC
MEE
TING
06/0
9/20
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESFY
2020
LIQ
UID
NITR
OGEN
SAFE
TYSU
PPLI
ESJA
NITO
RIAL
SUPP
LIES
LAB
SUPP
LIES
MIN
ORRE
HABI
LITA
TION
SEEP
SFL
OWM
ETER
REPL
ACEM
ENT
LAB
S UPP
LIES
PFC
MEE
TING
06/0
9/20
MAJ
OROV
ERHA
ULPR
OJEC
TFO
REN
GINE
NO.2
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESLA
BSU
PPLI
ESLA
BSU
PPLI
ESLA
BSU
PPLI
ESLA
BEQ
UIPM
ENT
REPA
IRTU
BING
BOD
SENS
OR
LAB
SUPP
LIES
SAFE
TYEQ
UIPM
ENT
PLAN
NED
MAI
NTEN
ANCE
SAFE
TYSU
PPLI
ESSA
FETY
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
9-24
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
2183
PAYN
EPE
STM
ANAG
EMEN
T23
4169
4318
6/17
/202
017
9.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
4546
4318
6/17
/202
060
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
5800
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
6030
4318
6/17
/202
017
9.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
6467
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
6607
4318
6/17
/202
060
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
6906
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
6972
4318
6/17
/202
035
.00
2183
PAYN
EPE
STM
ANAG
EMEN
T23
6985
4318
6/17
/202
060
.00
453
POLY
DYNE
INC
1459
783
4319
6/17
/202
011
,746
.91
1432
PROC
OPIO
CORY
HARG
REAV
ES&
SAVI
TCH
LLP
7171
8943
206/
17/2
020
16,3
86.8
514
32PR
OCOP
IOCO
RYHA
RGRE
AVES
&SA
VITC
HLL
P71
7190
4320
6/17
/202
05,
175.
0014
32PR
OCOP
IOCO
RYHA
RGRE
AVES
&SA
VITC
HLL
P71
7191
4320
6/17
/202
01,
552.
5014
32PR
OCOP
IOCO
RYHA
RGRE
AVES
&SA
VITC
HLL
P71
3777
4320
6/17
/202
022
,218
.00
1835
PURE
TEC
INDU
STRI
ALW
ATER
1801
811
4321
6/17
/202
040
2.12
1835
PURE
TEC
INDU
STRI
ALW
ATER
1804
528
4321
6/17
/202
025
6.71
1835
PURE
TEC
INDU
STRI
ALW
ATER
1804
529
4321
6/17
/202
071
.01
2513
SEPA
RATI
ONPR
OCES
S,IN
C.97
8443
226/
17/2
020
272.
0024
25SH
ARP
ELEC
TRON
ICS
CORP
ORAT
ION
9002
7822
5443
236/
17/2
020
125.
4850
9SK
CW
EST
INC
0332
257A
IN43
246/
17/2
020
846.
44LA
BSU
PPLI
ES20
91SI
GNAL
HILL
AUTO
ENTE
RPRI
SES
1310
3843
256/
17/2
020
646.
4154
6TR
IDEN
TTE
CHNO
LOGI
ESIN
C29
8115
743
266/
17/2
020
1,23
8.38
2392
UNIV
ARUS
AIN
C48
6060
9743
276/
17/2
020
950.
3623
92UN
IVAR
USA
INC
4860
6098
4327
6/17
/202
086
2.00
1551
WES
TAIR
GASE
S&
EQUI
PMEN
TIN
C80
3114
9343
286/
17/2
020
105.
0915
51W
ESTA
IRGA
SES
&EQ
UIPM
ENT
INC
4103
043
286/
17/2
020
(98.
95)
1865
WOO
DARD
&CU
RRAN
INC
1764
2143
296/
17/2
020
2,93
5.50
1865
WOO
DARD
&CU
RRAN
INC
1765
7043
296/
17/2
020
42,9
57.2
518
65W
OODA
RD&
CURR
ANIN
C17
6626
4329
6/17
/202
07,
414.
2518
65W
OODA
RD&
CURR
ANIN
C17
6631
4329
6/17
/202
02,
889.
2525
38W
ESTE
RNEL
ECTR
ICIT
YCO
ORDI
NATI
NGCO
UNCI
LCI
POLL
INIR
EG06
/20
4330
6/17
/202
010
0.00
21AI
RGAS
USA
LLC
9101
2616
8518
9117
6/17
/202
01,
324.
7695
1AN
ALYT
ICAL
TECH
NOLO
GYIN
C42
6689
1891
186/
17/2
020
1,49
5.49
1622
ANIX
TER
INC
18K4
4093
618
9119
6/17
/202
01,
065.
5744
AQUA
TIC
BIOA
SSAY
&CO
NSUL
TING
LAB
INC
ENC0
520.
0425
1891
206/
17/2
020
945.
0047
ASBU
RYEN
VIRO
NMEN
TALS
ERVI
CES
I500
0056
5934
1891
216/
17/2
020
95.0
068
2AS
COSE
RVIC
ESIN
C14
7855
718
9122
6/17
/202
094
0.00
1587
AT&
T00
0014
8373
7718
9123
6/17
/202
03,
816.
8815
87AT
&T
0000
1483
7378
1891
236/
17/2
020
40.1
315
87AT
&T
0000
1483
7379
1891
236/
17/2
020
40.1
315
87AT
&T
0000
1483
7380
1891
236/
17/2
020
59.3
714
61AT
&T
MOB
ILIT
Y87
7870
430X
0601
2020
1891
246/
17/2
020
2,18
6.63
2463
BLUE
BEAM
,INC
.12
5288
718
9125
6/17
/202
01,
646.
0081
BOOT
WOR
LDIN
C29
104
1891
266/
17/2
020
646.
7110
7CA
LTRO
LINC
CD99
1039
2118
9128
6/17
/202
021
1.06
107
CALT
ROLI
NCCD
9910
4395
1891
286/
17/2
020
1,16
8.65
2327
CBIO
NE01
1172
4IN
1891
296/
17/2
020
3,25
0.00
2534
CHRI
SGA
TEW
OOD
INDU
STRI
ES,I
NC.
2019
127
1891
306/
17/2
020
752.
1316
2CH
ARLE
SP
CROW
LEY
COIN
C26
962
1891
316/
17/2
020
3,17
9.81
112
CITY
OFCA
RLSB
AD97
4070
000
04/2
018
9132
6/17
/202
039
.42
112
CITY
OFCA
RLSB
AD97
4070
200
04/2
018
9132
6/17
/202
071
.08
112
CITY
OFCA
RLSB
AD50
8800
0000
04/2
018
9132
6/17
/202
012
,371
.57
133
COAS
TW
ASTE
MAN
AGEM
ENT
1258
246
0274
718
9133
6/17
/202
096
4.06
164
CSRM
A65
9018
9134
6/17
/202
04,
074.
0049
4DA
ILY
JOUR
NALC
ORPO
RATI
ONA3
3677
4418
9135
6/17
/202
083
.20
2530
DXP
ENTE
RPRI
SES,
INC
5140
7373
1891
366/
17/2
020
823.
8622
9FE
DERA
LEXP
RESS
CORP
698
851
626
1891
376/
17/2
020
325.
5622
9FE
DERA
LEXP
RESS
CORP
700
063
381
1891
376/
17/2
020
12.6
222
9FE
DERA
LEXP
RESS
CORP
700
660
244
1891
376/
17/2
020
74.8
924
1FL
OSY
STEM
SIN
CF1
7919
20D1
4318
9138
6/17
/202
02,
942.
1024
40GA
TEW
AYPA
CIFI
CCO
NTRA
CTOR
SIN
C90
2312
05/2
0ES
CROW
1891
396/
17/2
020
21,0
25.2
924
50GA
TEW
AYPA
CIFI
CCO
NTRA
CTOR
S,IN
C.90
2312
05/2
018
9140
6/17
/202
039
9,48
0.80
2500
GILM
ANCO
NSTR
UCTI
ONM
EDIA
,LLC
1605
1891
416/
17/2
020
339.
00
SOLI
DSPR
OCES
SUN
ITCE
NTRI
FUGE
FEED
PUM
PPR
IMAR
YAR
EAIM
PROV
EMEN
TSES
CROW
PRIM
ARY
AREA
IMPR
OVEM
ENTS
PROJ
ECT
CONS
TRUC
TION
PROJ
ECT
VIDE
OGRA
PHY
SERV
ICES
ADVE
RTIS
EMEN
TIN
VENT
ORY
DAF
POLY
PUM
PSH
IPPI
NGSH
IPPI
NGSH
IPPI
NG
FY20
20M
ETER
FOR
FIRE
MAI
NBL
DGFY
2020
MET
ERFO
RFI
REM
AIN
BLDG
FY20
20PO
TABL
EW
ATER
FY20
20TR
ASH
PICK
UPW
CPA
YROL
LAUD
IT
PIPI
NGAN
DEL
ECTR
ICAL
REPA
IRPI
PING
AND
ELEC
TRIC
ALRE
PAIR
SPEC
IALT
YSE
RVIC
ESPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
CWRF
PLAN
NED
MAI
NTEN
ANCE
UFSY
STEM
PUM
PRE
PLAC
EMEN
T
FY20
20M
ONTH
LYPH
ONE
SERV
ICE
FY20
20M
ONTH
LYPH
ONE
SERV
ICE
FY20
20W
IREL
ESS
SERV
ICE
INFO
RMAT
ION
SYST
EMS
BLUE
BEAM
REVU
LICE
NSES
SAFE
TYEQ
UIPM
ENT
SAFE
TYBO
OTS
TOXI
CITY
TEST
ING
SPEC
IALT
YSE
RVIC
ESSP
ECIA
LTY
SERV
ICES
FY20
20M
ONTH
LYPH
ONE
SERV
ICE
FY20
20M
ONTH
LYPH
ONE
SERV
ICE
EWPC
FBI
OSOL
IDS
MAN
AGEM
ENT
SUM
MAR
YSP
ECIA
LTY
SERV
ICES
SAFE
TYSU
PPLI
ESIN
VENT
ORY
D.O.
SENS
ING
MOD
ULE
SPEC
IALT
YSE
RVIC
ES
LAB
SUPP
LIES
CRED
ITM
EMO
HVAC
UPGR
ADES
DESI
GNBU
ILD
PROC
UREM
ENT
SUPP
ORT
FY20
20CA
PITA
LIM
PROV
EMEN
TPR
OGRA
MM
ANAG
EMEN
TSU
PPOR
THE
ATDR
YER
SYST
EMAS
SESS
MEN
T
SHAR
PCO
PIER
USAG
E
JANI
TORI
ALSU
PPLI
ESCH
EMIC
ALS
CHEM
ICAL
SSO
DIUM
HYDR
OXID
EFO
RCW
RFCH
EMIC
ALS
SODI
UMBI
SULF
ATE
SODI
UMBI
SULF
ITE
25%
LEGA
LSER
VICE
SPU
RETE
CLA
BDI
SERV
ICE
PURE
TEC
LAB
DISE
RVIC
EPU
RETE
CLA
BDI
SERV
ICES
PRET
REAT
MEN
TCW
RFR E
CYCL
EW
ATER
STOR
AGE
BASI
N
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20CE
PTPO
LYM
ERLE
GALS
ERVI
CES
LEGA
LSER
VICE
SLE
GALS
ERVI
CES
FY20
20PE
STCO
NTRO
LSER
VICE
SEW
AFY
2020
PEST
CONT
ROLS
ERVI
CES
PUM
PST
ATIO
NSFY
2020
PEST
CONT
ROLS
ERVI
CES
EWA
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
FY20
20PE
STCO
NTRO
LSER
VICE
SEW
AFY
2020
PEST
CONT
ROLS
ERVI
CES
EWA
FY20
20PE
STCO
NTRO
LSER
VICE
SPU
MP
STAT
IONS
9-25
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
2428
HAZE
NAN
DSA
WYE
R20
145
000
918
9142
6/17
/202
02,
963.
9624
28HA
ZEN
AND
SAW
YER
2014
500
11
1891
426/
17/2
020
7,24
6.35
234
JRFI
LANC
CONS
TRUC
TION
COM
PANY
INC
606
/20
1891
436/
17/2
020
74,4
63.8
319
5KE
NGR
ODY
FORD
INC
3132
1318
9144
6/17
/202
053
.84
325
KENN
EDY
JENK
SCO
NSUL
TING
1392
2918
9145
6/17
/202
05,
395.
0021
74LA
RRY
WAL
KER
ASSO
CIAT
ESIN
C00
538.
027
1891
466/
17/2
020
1,91
4.00
1173
LOGI
CALI
SS0
1186
918
9147
6/17
/202
095
,756
.00
1173
LOGI
CALI
SS0
1187
018
9147
6/17
/202
011
,865
.00
1247
JAM
ESM
ATTE
RNM
ATTE
RNED
REIM
B5/
2018
9148
6/17
/202
018
1.40
2419
MIC
HAEL
BARR
ANON
BARR
ANON
EDRE
IM5/
2018
9149
6/17
/202
020
7.00
2467
NORT
HERN
TOOL
&EQ
UIPM
ENT
CATA
LOG
HOLD
INGS
,INC
4453
5642
1891
506/
17/2
020
199.
3341
7OF
FICE
DEPO
TIN
C49
6096
5220
0118
9151
6/17
/202
090
2.54
417
OFFI
CEDE
POT
INC
4960
9695
3001
1891
516/
17/2
020
435.
2920
75OL
INCO
RPOR
ATIO
N28
3476
318
9152
6/17
/202
03,
916.
9120
75OL
INCO
RPOR
ATIO
N28
3766
618
9152
6/17
/202
03,
973.
0220
75OL
INCO
RPOR
ATIO
N28
3838
718
9152
6/17
/202
03,
726.
1144
6PE
RKIN
ELM
ERHE
ALT H
SCIE
NCES
5304
5151
3818
9153
6/17
/202
01,
039.
0244
6PE
RKIN
ELM
ERHE
ALTH
SCIE
NCES
5304
5180
3318
9153
6/17
/202
014
0.91
1914
PETT
YCA
SHPE
TTY
CASH
06/2
018
9154
6/17
/202
061
0.31
451
PITN
EYBO
WES
INC
3103
9847
3818
9155
6/17
/202
026
0.97
2322
PROM
INEN
TSY
STEM
SIN
C23
852R
EV18
9156
6/17
/202
050
,292
.75
2013
RADW
ELLI
NTER
NATI
ONAL
INC
3140
6089
1891
576/
17/2
020
653.
7946
7RE
DW
ING
SHOE
STOR
E19
22
4202
118
9158
6/17
/202
034
8.19
467
RED
WIN
GSH
OEST
ORE
564
143
5018
9158
6/17
/202
014
6.03
2252
REPU
BLIC
SERV
ICES
OFSA
NDI
EGO
0529
0031
7923
018
9159
6/17
/202
07,
385.
2720
32RI
GHT
OFW
AYEN
GINE
ERIN
GSE
RVIC
ESIN
C83
5418
9160
6/17
/202
084
0.00
1679
RMAU
TOM
ATIO
NIN
C00
0229
2018
9161
6/17
/202
03,
052.
3614
07JO
ESA
LLAY
SALL
AYED
REIM
05/2
018
9162
6/17
/202
070
.00
1407
JOE
SALL
AYSA
LLAY
EDRE
IM4/
205
1891
626/
17/2
020
70.0
014
07JO
ESA
LLAY
SALL
AYED
REIM
4/20
618
9162
6/17
/202
070
.00
1407
JOE
SALL
AYSA
LLAY
EDRE
IM5/
202
1891
626/
17/2
020
70.0
014
07JO
ESA
LLAY
SALL
AYED
REIM
5/20
318
9162
6/17
/202
070
.00
605
SAN
DIEG
OGA
S&
ELEC
TRIC
7938
05/2
018
9163
6/17
/202
02,
239.
1760
5SA
NDI
EGO
GAS
&EL
ECTR
IC84
9305
/20
1891
636/
17/2
020
12,0
56.4
324
61SA
VING
SACR
EDSI
TES
SSS
EPA
2A04
/20
1891
646/
17/2
020
279.
4470
4SD
G&E
SUND
RY51
2612
8018
9165
6/17
/202
029
.34
483
SSM
ECHA
NICA
LCON
STRU
CTIO
NCO
RP.
9081
0418
9166
6/17
/202
010
7,54
5.86
2473
STAN
EKCO
NSTR
UCTO
RS,I
NC.
007
05/2
018
9167
6/17
/202
012
0,09
9.09
2475
BANN
ERBA
NK00
705
/20
ESCR
OW18
9168
6/17
/202
06,
621.
0152
1SW
RCB
AVIL
ADI
AZOI
TIFY
2018
9169
6/17
/202
012
5.00
1017
TELE
DYNE
INST
RUM
ENTS
,INC
.S0
2039
9608
1891
706/
17/2
020
1,86
2.03
184
TEST
AMER
ICA
LABO
RATO
RIES
INC
4400
0397
0618
9171
6/17
/202
013
2.50
184
TEST
AMER
ICA
L ABO
RATO
RIES
INC
4400
0399
5018
9171
6/17
/202
067
.50
184
TEST
AMER
ICA
LABO
RATO
RIES
INC
4400
0399
8918
9171
6/17
/202
054
4.00
184
TEST
AMER
ICA
LABO
RATO
RIES
INC
4400
0400
8818
9171
6/17
/202
01,
383.
0018
4TE
STAM
ERIC
ALA
BORA
TORI
ESIN
C44
0004
0110
1891
716/
17/2
020
42.5
018
4TE
STAM
ERIC
ALA
BORA
TORI
ESIN
C44
0004
0111
1891
716/
17/2
020
132.
5018
4TE
STAM
ERIC
ALA
BORA
TORI
ESIN
C44
0004
0112
1891
716/
17/2
020
67.5
054
9SA
NDI
EGO
UNIO
NTR
IBUN
E45
8004
1805
/20
1891
726/
17/2
020
650.
4224
39UN
IVER
SALP
ROTE
CTIO
NSE
RVIC
ELP
1012
6865
1891
736/
17/2
020
10,4
27.0
214
60US
BANK
CORP
ORAT
EPA
YMEN
TSY
STEM
S42
4604
4555
6538
5005
2018
9174
6/17
/202
03,
154.
5856
7VI
STA
IRRI
GATI
ONDI
STRI
CT99
1400
2300
05/2
018
9175
6/17
/202
015
7.75
2354
WAY
NEGO
SSET
TFO
RD60
320
0218
1891
766/
17/2
020
36,6
06.3
823
54W
AYNE
GOSS
ETT
FORD
603
2002
181
1891
766/
17/2
020
3,75
6.42
1980
WHI
TENE
LSON
DIEH
LEVA
NSLL
P20
5122
1891
776/
17/2
020
5,70
9.60
$1,9
23,6
48.8
513
7CO
LONI
ALIN
SURA
NCE
CO93
4969
705
1338
942
936/
17/2
020
394.
2817
16IC
MA
#303
941
5106
543
076/
17/2
020
33,1
54.3
060
9IG
OE&
COM
PANY
INC
2170
2143
086/
17/2
020
100.
0017
17NA
TION
WID
E#0
0409
9900
151
066
4315
6/17
/202
03,
882.
6117
55CA
LPER
SFI
SCAL
SERV
DIV
OPEB
FY20
1891
276/
17/2
020
30,0
00.0
0$6
7,53
1.19
509
SKC
WES
TIN
C03
3225
7AIN
4324
6/24
/202
0(8
46.4
4)VO
IDCH
ECK
LIFE
INSU
RANC
EPR
EMIU
MS
MAY
Payr
ollR
un1
War
rant
0617
20FY
2020
EMPL
OYEE
REIM
BURS
EMEN
TBE
NEFI
TSPa
yrol
lRun
1W
arra
nt06
1720
END
OFFY
2020
OPEB
TRUS
TFU
NDCO
NTRI
BUTI
ON
FY20
20PO
TABL
EW
ATER
CIP
VEHI
CLES
NEW
2020
FORD
VAN
CIP
VEHI
CLES
NEW
2020
FORD
VAN
FY20
20FI
NANC
IALS
ERVI
CES
OUTS
IDE
LAB
ANAL
YSIS
OUTS
IDE
LAB
ANAL
YSIS
ADVE
RTIS
MEN
TSPL
ANT
SECU
RITY
CAL
CARD
CHAR
GES
MAY
OUTS
IDE
LAB
ANAL
YSIS
OUTS
IDE
LAB
ANAL
YSIS
OUTS
IDE
LAB
ANAL
YSIS
OUTS
IDE
LAB
ANAL
YSIS
OUTS
IDE
LAB
ANAL
YSIS
SCAD
ANE
TWOR
KIN
FRAS
TRUC
TURE
IDI
GEST
ERCL
EANI
NGAN
DCO
ATIN
GDI
GEST
ERCL
EANI
NGAN
DCO
ATIN
GES
CROW
CERT
IFIC
ATIO
NLA
BEQ
UIPM
ENT
REPA
IRAU
TOSA
MPL
ERSU
PPLI
ES
TUIT
ION
REIM
BURS
EMEN
TEL
ECTR
ICIT
YRB
PSEL
ECTR
ICIT
YBC
PSCU
LTUR
ALM
ONIT
ORIN
GSE
RVIC
ESM
E TER
ING
CHAR
GES
PIPI
NGAN
DEL
ECTR
ICAL
REPA
IRTU
ITIO
NRE
IMBU
RSEM
ENT
TUIT
ION
REIM
BURS
EMEN
TTU
ITIO
NRE
IMBU
RSEM
ENT
TUIT
ION
REIM
BURS
EMEN
T
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESCW
RFUF
SYST
EMS
SAFE
TYSU
PPLI
ESSA
FETY
SUPP
LIES
FY20
20GR
ITHA
ULIN
GSE
TTLE
MEN
TM
ONIT
ORIN
G
LAB
EQUI
PMEN
TRE
PAIR
LAB
EQUI
PMEN
TRE
PAIR
PETT
YCA
SH(0
3/27
/20
06/0
1/20
)FY
2020
POST
AGE
MAC
HINE
LEAS
EOD
ORRE
DUCT
ION
FACI
LITY
NO.1
C
MIS
CELL
ANEO
USOF
FICE
SUPP
LIES
MIS
CELL
ANEO
USOF
FICE
SUPP
LIES
FY20
20SO
DIUM
HYPO
CHLO
RITE
FY20
20SO
DIUM
HYPO
CHLO
RITE
FY20
20SO
DIUM
HYPO
CHLO
RITE
NEW
SERV
ERRO
OMPR
OJEC
TBU
SINE
SSNE
TWOR
KIM
PROV
EMEN
TSTU
ITIO
NRE
IMBU
RSEM
ENT
TUIT
ION
REIM
BURS
EMEN
TJA
NITO
RIAL
SUPP
LIES
ASSE
TRE
NEW
ALM
ANAG
EMEN
TPI
LOT
TASK
ORDE
RNO
.1CO
GEN
STRU
CTUR
ALRE
PAIR
SHOR
ING
SYST
EMIN
STAL
LATI
ONM
OBIL
EEQ
UIPM
ENT
REPA
IRVE
HICL
EIN
SPEC
TION
FY20
21R
CAM
PUP
DATE
PROF
ESSI
ONAL
SERV
ICES
DATA
,PRA
CTIC
ESAN
DPR
OCES
SESS
9-26
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
(846
.44)
UNIO
NBA
NKAN
ALYS
ISDE
FICI
TM
AY6/
25/2
020
$1,2
66.8
0BA
NKFE
E$1
,266
.80
1683
ACCO
UNTI
NGPR
INCI
PALS
INC
1108
6420
4331
6/30
/202
093
1.00
1683
ACCO
UNTI
NGPR
INCI
PALS
INC
1110
2105
4331
6/30
/202
01,
087.
8016
83AC
COUN
TING
PRIN
CIPA
LSIN
C11
1202
1343
316/
30/2
020
1,07
8.00
1683
ACCO
UNTI
NGPR
INCI
PALS
INC
1115
4857
4331
6/30
/202
01,
068.
2016
83AC
COUN
TING
PRIN
CIPA
LSIN
C11
1709
7143
316/
30/2
020
1,08
7.80
1683
ACCO
UNTI
NGPR
INCI
PALS
INC
1121
4164
4331
6/30
/202
01,
097.
6016
83AC
COUN
TING
PRIN
CIPA
LSIN
C11
2223
1743
316/
30/2
020
294.
0016
83AC
COUN
TING
PRIN
CIPA
LSIN
C11
2067
9243
316/
30/2
020
1,09
7.60
411
AJIL
ON11
2072
2643
326/
30/2
020
499.
2041
1AJ
ILON
1139
434
4332
6/30
/202
01,
146.
6041
1AJ
ILON
1139
9461
4332
6/30
/202
01,
248.
0041
1AJ
ILON
1128
1051
4332
6/30
/202
01,
248.
0041
1AJ
ILON
1117
1738
4332
6/30
/202
01,
154.
4041
1AJ
ILON
1118
9245
4332
6/30
/202
01,
248.
0041
1AJ
ILON
1115
5280
4332
6/30
/202
084
2.40
411
AJIL
ON11
1210
1943
326/
30/2
020
1,24
8.00
411
AJIL
ON11
1023
0943
326/
30/2
020
998.
4041
1AJ
ILON
1108
6518
4332
6/30
/202
099
8.40
2214
AMAN
DAYO
UNG
RIGB
YRI
GBY
BOD
06/2
043
336/
30/2
020
213.
2122
54AM
ERIC
ANSE
CURI
TYGR
OUP
2685
243
346/
30/2
020
4,72
1.71
2254
AMER
ICAN
SECU
RITY
GROU
P26
905
4334
6/30
/202
01,
500.
0022
07AR
BON
EQUI
PMEN
TCO
RPOR
ATIO
N24
0351
A43
356/
30/2
020
4,99
6.27
2207
ARBO
NEQ
UIPM
ENT
CORP
ORAT
ION
2403
56A
4335
6/30
/202
04,
996.
2722
07AR
BON
EQUI
PMEN
TCO
RPOR
ATIO
N24
7625
A43
356/
30/2
020
4,50
5.93
2207
ARBO
NEQ
UIPM
ENT
CORP
ORAT
ION
2476
37A
4335
6/30
/202
03,
878.
1810
06BA
KER
ELEC
TRIC
,INC
2054
7*02
4336
6/30
/202
015
,506
.27
91BR
OWN
&CA
LDW
ELL
4437
0650
4337
6/30
/202
039
,476
.87
1364
CALI
FORN
IAW
ATER
TECH
NOLO
GIES
3759
443
386/
30/2
020
6,40
9.88
1364
CALI
FORN
IAW
ATER
TECH
NOLO
GIES
3763
843
386/
30/2
020
6,43
2.55
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8806
443
396/
30/2
020
2,13
7.50
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8806
543
396/
30/2
020
2,27
4.00
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8806
643
396/
30/2
020
13,2
05.0
017
96CA
ROLL
OEN
GINE
ERS,
INC.
0188
067
4339
6/30
/202
012
,858
.75
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8806
843
396/
30/2
020
5,01
2.03
1796
CARO
LLO
ENGI
NEER
S,IN
C.01
8806
943
396/
30/2
020
11,7
52.9
417
96CA
ROLL
OEN
GINE
ERS,
INC.
0188
070
4339
6/30
/202
07,
452.
9017
96CA
ROLL
OEN
GINE
ERS,
INC.
0188
368
4339
6/30
/202
08,
723.
5522
91CA
THER
INE
BLAK
ESPE
ARBL
AKES
PEAR
BOD
06/2
043
406/
30/2
020
213.
2122
91CA
THER
INE
BLAK
ESPE
ARBL
AKES
PEAR
CIC
06/2
043
406/
30/2
020
213.
2123
11CD
MSM
ITH
9009
9374
4341
6/30
/202
022
,583
.50
2311
CDM
SMIT
H90
1012
5543
416/
30/2
020
30,3
37.0
023
11CD
MSM
ITH
9010
1274
4341
6/30
/202
05,
574.
2514
40CD
WGO
VERN
MEN
TZC
D797
043
426/
30/2
020
10,9
95.0
014
40CD
WGO
VERN
MEN
TZC
J667
643
426/
30/2
020
141.
2714
40CD
WGO
VERN
MEN
TZC
Q76
7243
426/
30/2
020
26,5
35.1
414
40CD
WGO
VERN
MEN
TZC
W88
9743
426/
30/2
020
1,93
4.11
1440
CDW
GOVE
RNM
ENT
ZDG0
095
4342
6/30
/202
018
0.89
1440
CDW
GOVE
RNM
ENT
ZDG0
691
4342
6/30
/202
01,
600.
4514
40CD
WGO
VERN
MEN
TZD
H224
943
426/
30/2
020
3,50
5.91
1440
CDW
GOVE
RNM
ENT
ZDM
8104
4342
6/30
/202
054
2.67
2486
CORI
NNE
SCHU
MAC
HER
SCHU
MAC
HER
BOD
06/2
043
436/
30/2
020
213.
2115
20DG
SOF
SSE
RVIC
ERE
VOLV
ING
FUND
1418
758
4344
6/30
/202
035
,929
.30
2182
DSSE
RVIC
ESOF
AMER
ICA
INC
1394
9775
0612
2043
456/
30/2
020
44.0
017
22EL
AINE
SULL
IVAN
SULL
IVAN
BOD
06/2
043
466/
30/2
020
213.
2120
8EL
ECTR
ICAL
SALE
SIN
C05
4208
0243
476/
30/2
020
2,90
7.90
1430
ENTE
RPRI
SEIN
DUST
RIAL
SUPP
LYIN
C66
489
4348
6/30
/202
02,
549.
3714
30EN
TERP
RISE
INDU
STRI
ALSU
PPLY
INC
6670
743
486/
30/2
020
1,57
8.38
219
ENVI
RONM
ENTA
LRES
OURC
EAS
SOCI
ATES
9404
0843
496/
30/2
020
934.
7220
58EV
ANTE
CCO
RPOR
ATIO
N20
2019
8843
506/
30/2
020
357.
8620
58EV
ANTE
CCO
RPOR
ATIO
N20
2020
7843
506/
30/2
020
95.2
6LA
BSU
PPLI
ES
AERA
TION
PROJ
ECT
SOLI
DSPR
OCES
SUN
ITS
HOSE
REPL
ACEM
ENT
DRYE
RCA
KEPU
MP
DAF
WIP
ERAR
MS
MAI
NTEN
ANCE
LAB
SUPP
LIES
LAB
SUPP
LIES
CIP
BOAR
DRO
OMRE
HABI
LITA
TION
BOD
MEE
TING
06/2
4/20
NATU
RALG
ASM
AY20
20FY
2020
DRIN
KING
WAT
ERSE
RVIC
ESBO
DM
EETI
NG06
/24/
20
INFO
RMAT
ION
SYST
EMS
COM
PUTE
RRE
PLAC
EMEN
TSIN
FORM
ATIO
NSY
STEM
SDE
LLTO
WER
SOFT
WAR
EBO
ARD
ROOM
REHA
BILI
TATI
ONIN
FORM
ATIO
NSY
STEM
SCO
MPU
TER
REPL
ACEM
ENTS
INFO
RMAT
ION
SYST
EMS
COM
PUTE
RRE
PLAC
EMEN
TS
PRIM
ARY
AREA
IMPR
OVEM
ENTS
ESDC
PRIM
ARY
AREA
IMPR
OVEM
ENTS
ESDC
DESI
GNBU
ILD
DOCU
MEN
TSFO
RSC
ADA
NETW
ORK
DESI
GNPR
OJEC
TIN
FORM
ATIO
NSY
STEM
SM
AINT
ENAN
CESO
FTW
ARE
RENE
WAL
PLAN
TW
IDE
DOOR
CAM
ERA
MON
ITOR
S
COGE
NBL
DGST
RUCT
URAL
REPA
IRPR
OJEC
TES
DC&
CMCO
GEN
BLDG
STRU
CTUR
ALRE
PAIR
PROJ
ECT
ESDC
&CM
ODOR
CONT
ROLM
ASTE
RPL
ANEN
GINE
ERIN
GSE
RVIC
ESBO
DM
EETI
NG06
/24/
20CI
CM
EETI
NG06
/17/
20
ENGI
NEER
ING
SERV
ICES
FOR
RAS
BOR
F1FA
NRE
PLAC
EMEN
TEV
ALUA
TION
REVE
NUE
AND
FINA
NCIA
LPRO
GRAM
EVAL
UATI
ONUP
DATE
LAND
OUTF
ALLR
EPAI
RPR
OJEC
TES
DCSO
LIDS
THIC
KENI
NGDE
SIGN
PROJ
ECT
PLAN
TW
IDE
HING
EAN
DCO
NTRO
LLER
REPL
ACEM
ENT
NEM
APPL
ICAT
ION
PROJ
ECT
DIGE
STER
CLEA
NING
AND
COAT
ING
ENGI
NEER
ING
SERV
ICES
DURI
NGCO
NSTR
UCTI
ONFY
2020
FERR
ICCH
LORI
DEFY
2020
FERR
ICCH
LORI
DE
CWRF
MIN
ORRE
HABI
LITA
TION
DOOR
SECU
RITY
CIP
MIG
RATE
SURV
EILA
NCE
SERV
ERCW
RFM
INOR
REHA
BILI
TATI
ONPE
DEST
RIAN
DOOR
REPA
IRCW
RFM
INOR
R EHA
BILI
TATI
ONPE
DEST
RIAN
DOOR
REPA
IRRB
PSM
INOR
REHA
BILI
TATI
ONST
ATIO
NDO
ORRE
PAIR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
BOD
MEE
TING
6/24
/20
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
TEM
PORA
RYLA
BOR
9-27
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
1005
FCIF
LUID
COM
PONE
NTS
INTE
RNAT
IONA
L11
3333
343
516/
30/2
020
870.
0023
20FI
NALT
OUCH
LAND
SCAP
ING
170
4352
6/30
/202
01,
880.
0024
0FI
SHER
SCIE
NTIF
IC13
0353
843
536/
30/2
020
50.9
224
0FI
SHER
SCIE
NTIF
IC10
9050
543
536/
30/2
020
464.
4324
0FI
SHER
SCIE
NTIF
IC11
8910
143
536/
30/2
020
219.
5824
0FI
SHER
SCIE
NTIF
IC11
8911
143
536/
30/2
020
70.5
224
0FI
SHER
SCIE
NTIF
IC05
3452
843
536/
30/2
020
2,35
8.65
240
FISH
ERSC
IENT
IFIC
0534
529
4353
6/30
/202
01,
058.
1624
0FI
SHER
SCIE
NTIF
IC06
3713
443
536/
30/2
020
23.9
224
0FI
SHER
SCIE
NTIF
IC07
3947
343
536/
30/2
020
143.
9624
0FI
SHER
SCIE
NTIF
IC07
3947
543
536/
30/2
020
627.
0924
0FI
SHER
SCIE
NTIF
IC01
9623
243
536/
30/2
020
848.
4426
3GI
ERLI
CHM
ITCH
ELLI
NC15
768
4354
6/30
/202
02,
411.
4026
8GR
AING
ERIN
C95
5724
7534
4355
6/30
/202
036
8.59
268
GRAI
NGER
INC
9564
6814
2843
556/
30/2
020
303.
7526
8GR
AING
ERIN
C95
4576
1398
4355
6/30
/202
056
.30
268
GRAI
NGER
INC
9546
1219
1543
556/
30/2
020
112.
6071
0HA
ROLD
JMAR
TIN
MAR
TIN
BOD
06/2
043
566/
30/2
020
213.
2113
80HA
WTH
ORNE
POW
ERSY
STEM
SSS
1001
2074
943
576/
30/2
020
335,
877.
3012
42JO
SEPH
MIC
HAEL
MOS
CAM
OSCA
BOD
06/2
043
596/
30/2
020
213.
2117
23JU
DYRI
TTER
RITT
ERCI
C06
/20
4360
6/30
/202
021
3.21
1723
JUDY
RITT
ERRI
TTER
BOD
06/2
043
606/
30/2
020
213.
2117
24KE
ITH
BLAC
KBUR
NBL
ACKB
URN
CIC
06/2
043
616/
30/2
020
213.
2117
24KE
ITH
BLAC
KBUR
NBL
ACKB
URN
BOD
06/2
043
616/
30/2
020
213.
2118
73SK
YHAW
KIN
DUST
RIES
INC
2916
943
626/
30/2
020
143.
2518
73SK
YHAW
KIN
DUST
RIES
INC
2902
343
626/
30/2
020
143.
2523
23M
ALLO
RYSA
FETY
AND
SUPP
LYLL
C48
6008
243
636/
30/2
020
183.
1823
23M
ALLO
RYSA
FETY
AND
SUPP
LYLL
C48
6008
343
636/
30/2
020
366.
3529
9M
ATHE
SON
TRIG
AS21
8236
3643
646/
30/2
020
618.
5137
2M
CMAS
TER
CARR
SUPP
LYCO
4052
2171
4365
6/30
/202
011
9.94
372
MCM
ASTE
RCA
RRSU
PPLY
CO41
3401
0943
656/
30/2
020
133.
7137
2M
CMAS
TER
CARR
SUPP
LYCO
4092
7546
4365
6/30
/202
01,
427.
8122
48M
WM
ECHA
NICA
LINC
1057
7599
4366
6/30
/202
02,
409.
0024
13ON
SIGH
TSA
FETY
OPTI
CSLL
C20
0143
686/
30/2
020
400.
0014
32PR
OCOP
IOCO
RYHA
RGRE
AVES
&SA
VITC
HLL
P71
7192
4370
6/30
/202
017
,698
.50
2514
SERV
ICE
FILT
RATI
ONCO
RPOR
ATIO
N28
2147
4371
6/30
/202
072
9.13
509
SKC
WES
TIN
C00
3225
7AIN
R43
726/
30/2
020
846.
4423
92UN
IVAR
USA
INC
4862
6560
4373
6/30
/202
095
0.36
2392
UNIV
ARUS
AIN
C48
6272
4243
736/
30/2
020
900.
7912
22VA
UGHA
NSIN
DUST
RIAL
REPA
IRCO
INC
0271
5443
746/
30/2
020
13,3
38.7
715
51W
ESTA
IRGA
SES
&EQ
UIPM
ENT
INC
1104
6635
4375
6/30
/202
013
0.66
1865
WOO
DARD
&CU
RRAN
INC
1773
4843
766/
30/2
020
500.
0025
38W
ESTE
RNEL
ECTR
ICIT
YCO
ORDI
NATI
NGCO
UNCI
LCI
POLI
NIRE
G06
/20
243
776/
30/2
020
25.0
083
53W
IRE,
LLC
0041
567
1891
786/
30/2
020
196.
3521
AIRG
ASUS
ALL
C90
9290
5703
1891
796/
30/2
020
1,72
9.05
21AI
RGAS
USA
LLC
9100
5827
1118
9180
6/30
/202
086
.36
1718
ALLA
NJU
LIUS
SEN
JULI
USSE
NCI
C06
/20
1891
816/
30/2
020
213.
2117
18AL
LAN
JULI
USSE
NJU
LIUS
SEN
BOD
06/2
018
9181
6/30
/202
021
3.21
1718
ALLA
NJU
LIUS
SEN
JULI
USSE
NAG
E06
/20
1891
816/
30/2
020
213.
2123
56AL
LIAN
CECO
RPOR
ATIO
N20
2981
1891
826/
30/2
020
3,62
8.15
1622
ANIX
TER
INC
18K4
4149
218
9183
6/30
/202
01,
490.
2816
22AN
IXTE
RIN
C18
K441
493
1891
836/
30/2
020
1,85
4.56
1622
ANIX
TER
INC
18K4
4187
118
9183
6/30
/202
01,
390.
8516
22AN
IXTE
RIN
C18
K443
013
1891
836/
30/2
020
1,49
0.28
1622
ANIX
TER
INC
18K4
4335
018
9183
6/30
/202
02,
965.
2280
3AP
PLIE
DIN
DUST
RIAL
TECH
NOLO
GIES
7019
1134
9518
9184
6/30
/202
015
1.68
925
ARAM
ARK
UNIF
ORM
&CA
REER
APPA
REL
0014
5133
7575
1891
856/
30/2
020
444.
9892
5AR
AMAR
KUN
IFOR
M&
CARE
ERAP
PARE
L00
1451
3600
8018
9185
6/30
/202
059
2.74
925
ARAM
ARK
UNIF
ORM
&CA
REER
APPA
REL
1451
3485
4918
9185
6/30
/202
037
4.78
925
ARAM
ARK
UNIF
ORM
&CA
REER
APPA
REL
1451
3719
5018
9185
6/30
/202
042
0.06
682
ASCO
SERV
ICES
INC
1489
694
1891
866/
30/2
020
16,1
28.7
123
95AT
&T
4274
8055
0118
9187
6/30
/202
056
2.04
863
BAY
CITY
ELEC
TW
ORKS
INC
W22
5904
1891
886/
30/2
020
1,83
5.78
FY20
20UN
IFOR
MRE
NTAL
&CL
EANI
NGBC
PSM
INOR
REHA
BILI
TATI
ONAU
TOM
ATIC
TRAN
SFER
SWIT
CHRE
PLAC
EMEN
TFY
2020
SWIT
CHED
ETHE
RNET
SERV
ICES
GENE
RATO
RTE
STIN
G
PLAN
TW
IDE
KEY
PAD
REPL
ACEM
ENT
DOOR
SPL
ANT
REPA
IRS
PART
SAN
DSU
PPLI
ESFY
2020
UNIF
ORM
RENT
AL&
CLEA
NING
FY20
20UN
IFOR
MRE
NTAL
&CL
EANI
NGFY
2020
UNIF
ORM
RENT
AL&
CLEA
NING
RTO
MAI
NTEN
ANCE
PLAN
TW
IDE
DOOR
LOCK
SPL
ANT
WID
EDO
ORLO
CKS
PLAN
TW
IDE
KEY
PAD
REPL
ACEM
ENT
DOOR
SPL
ANT
WID
EDO
ORLO
CKS
SAFE
TYEQ
UIPM
ENT
PROT
ECTI
VECL
OTHI
NGSA
FETY
EQUI
PMEN
TCI
CM
EETI
NG06
/17/
20BO
DM
EETI
NG06
/24/
20AG
ENDA
REVI
EW06
/23/
20
MIN
ORRE
HABI
LITA
TION
FLOW
AYVE
RTIC
ALPU
MP
REPA
IRPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
PRIM
ARY
AREA
IMPR
OVEM
ENTS
CEQ
ACO
MPL
IANC
ESP
ECIA
LTY
SERV
ICES
LAB
SUPP
LIES
LEGA
LSER
VICE
SPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
MEC
HANI
CALS
EAL
LAB
SUPP
LIES
CHEM
ICAL
SSO
DIUM
HYDR
OXID
E25
%FO
RCW
RFCH
EMIC
ALS
SODI
UMBI
SULF
ITE
25%
FOR
CWRF
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESPU
REGR
EEN
MAR
KETI
NGZI
PTI
ESPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
SPEC
IALT
YSE
RVIC
ESSA
FETY
EQUI
PMEN
T
AGEN
DADE
LIVE
RIES
PFC
&CI
CAG
ENDA
DELI
VERI
ESSA
FETY
SUPP
LIES
SAFE
TYSU
PPLI
ESFY
2020
LIQ
UID
NITR
OGEN
BOD
MEE
TING
06/2
4/20
CIC
MEE
TING
06/1
7/20
BOD
MEE
TING
06/2
4/20
CIC
MEE
TING
06/1
7/20
BOD
MEE
TING
06/2
4/20
SAFT
EYSU
PPLI
ESSA
FTEY
SUPP
LIES
SAFT
EYSU
PPLI
ESBO
DM
EETI
NG06
/24/
20M
AJOR
OVER
HAUL
PROJ
ECT
FOR
ENGI
NENO
.1
LAB
SUPP
LIES
LAB
S UPP
LIES
LAB
SUPP
LIES
PRIM
ARY
SEDI
MEN
TARY
TANK
SSA
FETY
SUPP
LIES
LAB
SUPP
LIES
LAB
SUPP
LIES
LAB
MIN
OREQ
UIPM
ENT
REPL
ACEM
ENT
OVEN
LAB
SUPP
LIES
LAB
SUPP
LIES
SPEC
IALT
YSE
RVIC
ESFY
2020
LAND
SCAP
ING
LAB
SUPP
LIES
LAB
SUPP
LIES
9-28
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
863
BAY
CITY
ELEC
TW
ORKS
INC
W22
5905
1891
886/
30/2
020
751.
1486
3BA
YCI
TYEL
ECT
WOR
KSIN
CW
2259
0618
9188
6/30
/202
01,
557.
1286
3BA
YCI
TYEL
ECT
WOR
KSIN
CW
2259
0718
9188
6/30
/202
058
6.56
863
BAY
CITY
ELEC
TW
ORKS
INC
W22
6146
1891
886/
30/2
020
475.
1286
3BA
YCI
TYEL
ECT
WOR
KSIN
CW
2261
4718
9188
6/30
/202
072
0.63
863
BAY
CITY
ELEC
TW
ORKS
INC
W22
6148
1891
886/
30/2
020
877.
8286
3BA
YCI
TYEL
ECT
WOR
KSIN
CW
2261
4918
9188
6/30
/202
067
5.60
2528
CIRA
APPS
LIM
ITED
2344
618
9190
6/30
/202
01,
200.
0011
2CI
TYOF
CARL
SBAD
0050
9000
0005
/20
1891
916/
30/2
020
73.5
211
2CI
TYOF
CARL
SBAD
0111
8100
0005
/20
1891
916/
30/2
020
135.
0516
9CW
EACH
AMBE
RSCE
RT20
1891
926/
30/2
020
94.0
049
4DA
ILY
JOUR
NALC
ORPO
RATI
ONA3
3662
4018
9193
6/30
/202
074
.10
2536
DAPR
ACO
RPOR
ATIO
N51
1954
818
9194
6/30
/202
07,
624.
0515
14DE
NALI
WAT
ERSO
LUTI
ONS
LLC
0027
450
IN18
9195
6/30
/202
019
,764
.71
1514
DENA
LIW
ATER
SOLU
TION
SLL
C00
2705
6IN
1891
956/
30/2
020
12,5
49.5
215
14DE
NALI
WAT
ERSO
LUTI
ONS
LLC
0027
057
IN18
9195
6/30
/202
05,
089.
7515
14DE
NALI
WAT
ERSO
LUTI
ONS
LLC
0027
058
IN18
9195
6/30
/202
02,
502.
3918
82DI
RECT
V37
5384
6229
318
9196
6/30
/202
010
3.99
1005
FCIF
LUID
COM
PONE
NTS
INTE
RNAT
IONA
L11
3333
418
9197
6/30
/202
056
0.00
229
FEDE
RALE
XPRE
SSCO
RP7
036
5024
518
9198
6/30
/202
077
.82
229
FEDE
RALE
XPRE
SSCO
RP7
042
7370
518
9198
6/30
/202
012
7.78
241
FLO
SYST
EMS
INC
F179
1220
D150
1891
996/
30/2
020
12,1
00.8
126
0GL
OBAL
POW
ERGR
OUP
INC.
6870
218
9200
6/30
/202
015
,836
.41
260
GLOB
ALPO
WER
GROU
PIN
C.68
724
1892
006/
30/2
020
15,8
36.4
126
0GL
OBAL
POW
ERGR
OUP
INC.
6899
218
9200
6/30
/202
011
,769
.66
2256
HARO
LDBE
CK&
SON
INC
3236
5518
9201
6/30
/202
09,
967.
2524
28HA
ZEN
AND
SAW
Y ER
2014
500
12
1892
026/
30/2
020
8,63
5.00
283
HOM
EDE
POT
CRED
ITSE
RVIC
ES50
5502
118
9203
6/30
/202
032
.38
283
HOM
EDE
POT
CRED
ITSE
RVIC
ES90
1126
318
9203
6/30
/202
033
4.49
2386
HVAC
MEC
HANA
LYSI
S,IN
C16
4454
0418
9204
6/30
/202
045
0.00
2028
JIMHE
RNAN
DEZ
HERN
ANDE
ZBO
D06
/20
1892
056/
30/2
020
213.
2120
28JIM
HERN
ANDE
ZHE
RNAN
DEZ
CIC
06/2
018
9205
6/30
/202
021
3.21
234
JRFI
LANC
CONS
TRUC
TION
COM
PANY
INC
706
/20
1892
066/
30/2
020
14,2
60.9
219
5KE
NGR
ODY
FORD
INC
3144
4918
9207
6/30
/202
055
.57
195
KEN
GROD
YFO
RDIN
C31
3273
1892
076/
30/2
020
1,17
5.00
325
KENN
EDY
JENK
SCO
NSUL
TING
1394
8218
9208
6/30
/202
062
,658
.55
325
KENN
EDY
JENK
SCO
NSUL
TING
1394
8318
9208
6/30
/202
025
,367
.90
325
KENN
EDY
JENK
SCO
NSUL
TING
1394
8418
9208
6/30
/202
033
,810
.30
330
KONE
CRAN
ES,I
NC15
4296
925
1892
096/
30/2
020
1,29
6.75
2174
LARR
YW
ALKE
RAS
SOCI
ATES
INC
0053
8.02
818
9210
6/30
/202
01,
751.
0011
73LO
GICA
LIS
S011
871
1892
126/
30/2
020
14,4
30.0
011
73LO
GICA
LIS
S011
872
1892
126/
30/2
020
2,45
0.00
1173
LOGI
CALI
SS0
1187
318
9212
6/30
/202
013
,837
.50
1173
LOGI
CALI
SS 0
1187
418
9212
6/30
/202
012
,235
.00
2096
MIC
HAEL
BONI
FACI
NIBO
NIFA
CINI
EDRE
IM5/
2018
9213
6/30
/202
039
0.65
2518
MOU
SER
ELEC
TRON
ICS,
INC.
5679
0218
1892
146/
30/2
020
722.
1924
17OC
CUPA
TION
ALHE
ALTH
CENT
ERS
OFCA
LIFO
RNIA
,68
1990
1918
9215
6/30
/202
010
8.00
417
OFFI
CEDE
POT
INC
4960
9695
4001
1892
166/
30/2
020
52.9
841
7OF
FICE
DEPO
TIN
C50
9147
6580
0118
9216
6/30
/202
01,
487.
4541
7OF
FICE
DEPO
TIN
C49
3894
9760
0118
9216
6/30
/202
038
5.30
2075
OLIN
CORP
ORAT
ION
2840
273
1892
176/
30/2
020
3,77
2.61
2075
OLIN
CORP
ORAT
ION
2843
240
1892
176/
30/2
020
3,89
2.86
2081
PERK
INEL
MER
HEAL
THSC
IENC
ESIN
C53
0452
4809
1892
186/
30/2
020
422.
6023
22PR
OMIN
ENT
SYST
EMS
INC
2391
818
9219
6/30
/202
050
,770
.63
2378
QUA
LITY
SECU
RITY
SERV
ICES
5448
318
9220
6/30
/202
04,
155.
0023
78Q
UALI
TYSE
CURI
TYSE
RVIC
ES54
484
1892
206/
30/2
020
4,95
6.50
1407
JOE
SALL
AYSA
LLAY
EDRE
IM5/
204
1892
216/
30/2
020
70.0
014
07JO
ESA
LLAY
SALL
AYED
REIM
5/20
518
9221
6/30
/202
070
.00
1407
JOE
SALL
AYSA
LLAY
EDRE
IM5/
206
1892
216/
30/2
020
70.0
014
07JO
ESA
LLAY
SALL
AYED
REIM
5/20
718
9221
6/30
/202
070
.00
605
SAN
DIEG
OGA
S&
ELEC
TRIC
9575
06/2
018
9222
6/30
/202
090
,034
.45
605
SAN
DIEG
OGA
S&
ELEC
TRIC
6192
06/2
018
9222
6/30
/202
070
6.02
605
SAN
DIEG
OGA
S&
ELEC
TRIC
4616
06/2
018
9222
6/30
/202
08,
838.
85EL
ECTR
ICIT
YCW
RFEL
ECTR
ICIT
YCW
RF
TUIT
ION
REIM
BURS
EMEN
TTU
ITIO
NRE
IMBU
RSEM
ENT
TUIT
ION
REIM
BURS
EMEN
TTU
ITIO
NRE
IMBU
RSEM
ENT
ELEC
TRIC
ITY
EWPC
F
FY20
20SO
DIUM
HYPO
CHLO
RITE
LAB
EQUI
PMEN
TRE
PAIR
ICP
PROB
EOD
ORRE
DUCT
ION
FACI
LITY
NO.1
CCW
RFM
NOR
REHA
BILI
TATI
ONIN
STAL
LCON
DUIT
TOCO
NNEC
TDO
ORS
PLAN
TW
IDE
HING
EAN
DCO
NTRO
LLER
REPL
ACEM
ENT
SAFE
TYAN
DM
EDIC
ALSE
RVIC
ESM
ISCE
LLAN
EOUS
OFFI
CESU
PPLI
ESM
ISCE
LLAN
EOUS
OFFI
CESU
PPLY
MIS
CELL
ANEO
USOF
FICE
SUPP
LIES
FY20
20SO
DIUM
HYPO
CHLO
RITE
BUSI
NESS
NETW
ORK
IMPR
OVEM
ENTS
BUSI
NESS
NETW
ORK
IMPR
OVEM
ENTS
BUSI
NESS
NETW
ORK
IMPR
OVEM
ENTS
TUIT
ION
REIM
BURS
EMEN
TIN
FORM
ATIO
NSY
STEM
SHA
RDW
ARE
TASK
ORDE
RNO
.3DI
GEST
ERCL
EANI
NG&
COAT
ING
PROJ
ECT
CMS
SERV
ICES
TASK
ORDE
RNO
.4NE
TWOR
KIM
PROV
EMEN
TPH
ASE
1PR
OJEC
TCM
SSP
ECIA
LTY
SERV
ICES
PROF
ESSI
ONAL
SERV
ICES
BUSI
NESS
NETW
ORK
IMPR
OVEM
ENTS
CIC
MEE
TING
06/1
7/20
TASK
ORDE
RNO
.1CO
GEN
STRU
CTUR
ALRE
PAIR
SHOR
ING
SYST
EMIN
STAL
LATI
ONM
OBIL
EEQ
UIPM
ENT
REPA
IRM
OBIL
EEQ
UIPM
ENT
REPA
IRTA
SKOR
DER
NO.1
PRIM
ARY
AREA
IMPR
OVEM
ENTS
CMS
ASSE
TRE
NEW
ALM
ANAG
EMEN
TPI
LOT
PLAN
TRE
PAIR
PART
SAN
DSU
PPLI
ESPL
ANT
REPA
IRPA
RTS
AND
SUPP
LIES
SPEC
IALT
YSE
RVIC
ESBO
DM
EETI
NG06
/24/
20
PRIM
ARIE
SM
OYNO
2000
PUM
PRE
BUIL
DCO
GEN
REPL
ACE
UPS
BATT
ERIE
SCO
GEN
REPL
ACE
UPS
BATT
ERIE
SCO
GEN
SHUT
TRIP
BREA
KER
INST
ALLA
TION
CIP
2WFL
OWCO
NTRO
LVAL
VERE
PLAC
EMEN
T
FY20
20BI
OSOL
IDS
HAUL
ING
AND
HAND
LING
SERV
ICES
FY20
20DI
RECT
VSE
RVIC
ESSP
ECIA
LTY
SERV
ICES
EFFL
UENT
TEST
ING
EFFL
UENT
TEST
ING
ADVE
RTIS
EMEN
TSTE
CHNI
CALS
ERVI
CES
ASSE
TID
MAR
KING
MAC
HINE
FY20
20BI
OSOL
IDS
HAUL
ING
AND
HAND
LING
SERV
ICES
FY20
20BI
OSOL
IDS
HAUL
ING
AND
HAND
LING
SERV
ICES
FY20
20BI
OSOL
IDS
HAUL
ING
AND
HAND
LING
SERV
ICES
FUEL
FOR
GENE
RATO
RSIN
FORM
ATIO
NSY
STEM
SCI
RASY
NCSU
BSCR
IPTI
ONFY
2020
POTA
BLE
WAT
ERFY
2020
POTA
BLE
WAT
ERCE
RTIF
ICAT
ION
GENE
RATO
RTE
STIN
GGE
NERA
TOR
TEST
ING
FUEL
FOR
GENE
RATO
RSFU
ELFO
RGE
NERA
TORS
FUEL
FOR
GENE
RATO
RS
GENE
RATO
RTE
STIN
G
9-29
VEND
OR
NAM
EIN
VOIC
ECH
ECK
NOCH
ECK
DATE
INVO
ICE
NET
ACCO
UNTS
PAYA
BLE
CHEC
KRE
GIST
ERJU
NE20
20
INVO
ICE
DESC
RIPT
ION
605
SAN
DIEG
OGA
S&
ELEC
TRIC
8493
06/2
018
9222
6/30
/202
011
,501
.49
605
SAN
DIEG
OGA
S&
ELEC
TRIC
8747
06/2
018
9222
6/30
/202
010
,286
.59
605
SAN
DIEG
OGA
S&
ELEC
TRIC
8488
06/2
018
9222
6/30
/202
011
,254
.81
605
SAN
DIEG
OGA
S&
ELEC
TRIC
2055
06/2
018
9222
6/30
/202
012
.08
605
SAN
DIEG
OGA
S&
ELEC
TRIC
2781
06/2
018
9222
6/30
/202
031
,008
.02
605
SAN
DIEG
OGA
S&
ELEC
TRIC
1319
06/2
018
9222
6/30
/202
03,
121.
0620
66SL
OAN
ELEC
TROM
ECHA
NICA
LSER
VICE
5716
5918
9223
6/30
/202
04,
913.
9710
17TE
LEDY
NEIN
STRU
MEN
TS,I
NC.
S020
4033
7518
9224
6/30
/202
039
1.35
184
TEST
AMER
ICA
LABO
RATO
RIES
INC
4400
0407
7018
9225
6/30
/202
037
.50
184
TEST
AMER
ICA
LABO
RATO
RIES
INC
4400
0408
1618
9225
6/30
/202
019
5.00
184
TEST
AMER
ICA
LABO
RATO
RIES
INC
4400
0408
2018
9225
6/30
/202
067
.50
184
TEST
AMER
ICA
LABO
RATO
RIES
INC
4400
0410
4518
9225
6/30
/202
027
.50
1635
THE
NYHA
RTCO
MPA
NYR1
6000
818
9226
6/30
/202
02,
250.
0024
39UN
IVER
SALP
ROT E
CTIO
NSE
RVIC
ELP
1015
9477
1892
276/
30/2
020
10,1
86.0
320
50VE
RIZO
NW
IREL
ESS
9856
3581
5718
9228
6/30
/202
012
5.12
$1,3
20,3
70.1
517
16IC
MA
#303
941
5130
943
586/
30/2
020
32,7
48.6
117
17NA
TION
WID
E#0
0409
9900
151
310
4367
6/30
/202
03,
918.
7699
7PI
CKER
ING
INSU
RANC
ESE
RVIC
ESIN
C99
6943
696/
30/2
020
300.
0099
7PI
CKER
ING
INSU
RANC
ESE
RVIC
ESIN
C99
7043
696/
30/2
020
300.
0017
55CA
LPER
SFI
SCAL
SERV
DIV
PEPR
AUA
L06/
2018
9189
6/30
/202
04,
469.
0017
55CA
LPER
SFI
SCAL
SERV
DIV
CLAS
SIC
UAL0
6/20
1891
896/
30/2
020
95,5
31.0
022
76LE
GALS
HIEL
D01
4753
106
/20
1892
116/
30/2
020
33.9
0$1
37,3
01.2
7$4
,548
,444
.39
$1,3
01,4
78.8
5$3
,246
,965
.54
$4,5
48,4
44.3
9CA
PITA
LFUN
DTO
TAL
GRAN
DTO
TAL
TOTA
LACC
OUN
TSPA
YABL
EDI
SBUR
SEM
ENTS
OPE
RATI
NGFU
NDTO
TAL
EMPL
OYEE
BENE
FITS
BROK
ERAG
EEM
PLOY
EEBE
NEFI
TSBR
OKER
AGE
CALP
ERS
UNFU
NDED
LIAB
ILIT
YPE
PRA
PLAN
2714
0CA
LPER
SUN
FUND
EDLI
ABIL
ITY
CLAS
SIC
PLAN
1586
LEGA
LSER
VICE
S
PLAN
TSE
CURI
TYFY
2020
TELE
PHON
EW
IREL
ESS
Payr
ollR
un1
War
rant
0701
20Pa
yrol
lRun
1W
arra
nt07
0120
OUTS
IDE
LAB
ANAL
YSIS
OUTS
IDE
LAB
ANAL
YSIS
OUTS
IDE
LAB
ANAL
YSIS
OUTS
IDE
LAB
ANAL
YSIS
GASB
74/7
5OP
EBRE
PORT
ING
&AC
TUAR
IALV
ALUA
TION
ELEC
TRIC
ITY
AHPS
ELEC
TRIC
ITY
BVPS
ELEC
TRIC
ITY
AHPS
SPEC
IALT
YSE
RVIC
ESLA
BEQ
UIPM
ENT
REPA
IR
ELEC
TRIC
ITY
BCPS
ELEC
TRIC
ITY
AHPS
ELEC
TRIC
ITY
CWRF
9-30
ITEM 10 TREASURER'S CASH AND INVESTMENTSREPORT DASHBOARD FOR JUNE 2020
$0.3M$2M
$4M
$6M
$8M
$10M
$12M
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
FY2020
Receipts
$5.2M
$2M
$4M
$6M
$8M
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
FY2020
Disbursements
$96K
$677K
$279K$2M
$4M
$6M
$8M
$10M
$12M
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
FY2020
Cash & Investments
Total LAIF CAMP Cash
This represents unaudited data. 10-1
Ref: F&HR.20 4029
ENCINA WASTEWATER AUTHORITY
BOARD OF DIRECTORS
Item : 10
Date : July 22, 2020
To : Honorable Chair and Board of Directors
From : LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor
Issue : TREASURER’S CASH AND INVESTMENT REPORT FOR JUNE 2020
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Receive and file the Treasurer’s Cash and Investment Report for June 2020.
FIVE YEAR STRATEGIC BUSINESS PLAN REFERENCE
Strategic Initiative No. 6: Continue fiscal responsibility and revenue generation.
DISCUSSION
Cash. EWA’s cash book balance on June 30, 2020 was $676,607.34.
Reserves. EWA’s Financial Reserve Policy was last amended on June 26, 2019 by Resolution No. 2019 02funding EWA’s operating, remote facility, capital, and inventory reserves to meet anticipated cashrequirements.
Investments. EWA’s investments consist of funds deposited with the LAIF and CAMP. The total LAIF balanceat the end of June was $279,130.55 and the total CAMP balance at the end of June was $95,791.84. Themost recent LAIF and CAMP statement for the month of June 2020 is attached for your reference.
Total Cash & Investments. Cash and investments on June 30, 2020 total $1,051,529.73.
June 30, 2020 May 31, 2020
Operating Account $675,607.34 $5,764,820.82
Petty Cash $1,000.00 $1,000.00
Sub Total: Cash $676,607.34 $5,765,820.82
LAIF Investments $279,130.55 $82,130.55
CAMP Investments $95,791.84 $95,751.58
Total Cash and Investments $1,051,529.73 $5,943,702.95
10-2
Cash Receipts. EWA received payments for Source Control violations, Lab Services, Puregreen Sales, FOGand Brewery Waste, South Parcel Lease, and miscellaneous receipts totaling $74,286.51. CAMP dividendsincome for $40.26 were received for the month of June 2020.
Cash Disbursements. Checks and electronic payments were issued totaling $5,180,820.46.
Endorsements. By the signature affixed above, I, LeeAnn Warchol, Administrative Services Manager andTreasurer/Auditor of the Encina Wastewater Authority hereby certify that:
Michael Steinlicht, General Manager, received this report on July 13, 2020.
The Board of Directors will consider this report on July 22, 2020.
All investments comply with EWA’s Investment Policy adopted by Resolution No. 2019 02 on June26, 2019.
THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Receive and file the Treasurer’s Cash and Investment Report for June 2020.
Attachment 1: Statement of Investment Information June 2020 and Monthly YieldAttachment 2: Local Agency Investment Fund June 2020 StatementAttachment 3: California Asset Management Program June 2020 Statement
Prepared by: Grace Gilberg, Accounting Technician IIReviewed by: Mariana Grindley, Accounting Technician IIApproved by: LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor
10-3
FUNDS ON DEPOSIT WITH AMOUNT
LOCAL AGENCY INVESTMENT FUNDJUNE 2020 YIELD 1.217%
TOTAL DEPOSIT 4,097,000.00$TOTAL WITHDRAWAL 3,900,000.00$CLOSING BALANCE 279,130.55$
CALIFORNIA ASSET MANAGEMENT PROGRAMJUNE 2020 YIELD .51%
TOTAL DEPOSIT 40.26$TOTAL WITHDRAWAL $CLOSING BALANCE 95,791.84$
TOTAL INVESTMENT FUNDS 374,922.39$
STATEMENT OFINVESTMENT INFORMATION
AS OF JUNE 30, 2020
10-5
Local Agency Investment Fund P.O. Box 942809Sacramento, CA 94209-0001(916) 653-3001
July 11, 2020
LAIF HomePMIA Average Monthly Yields
ENCINA WASTEWATER AUTHORITY
TREASURER 6200 AVENIDA ENCINAS CARLSBAD, CA 92009-0171
Account Number: 40-37-004
June 2020 Statement
Tran Type Definitions
Effective Date
Transaction Date
Tran Type Confirm
Number
Web Confirm Number Authorized Caller Amount
6/5/2020 6/4/2020 RD 1643050 1603118 LEEANN WARCHOL 4,097,000.00 6/17/2020 6/16/2020 RW 1643678 1603761 LEEANN WARCHOL -2,100,000.00 6/30/2020 6/30/2020 RW 1644586 1604677 LEEANN WARCHOL -1,800,000.00
Account Summary
Total Deposit: 4,097,000.00 Beginning Balance: 82,130.55
Total Withdrawal: -3,900,000.00 Ending Balance: 279,130.55
Page 1 of 1LAIF Regular Monthly Statement
7/11/2020https://laifms.treasurer.ca.gov/RegularStatement.aspx
10-7
Jun 1.217May 1.363Apr 1.648
PMIA Quarter to Date(1): 1.89%208PMIA Average Life(1):
2.03LAIF Apportionment Rate(2):0.000055354606930461.007481015
LAIF Earnings Ratio(2): LAIF Fair Value Factor(1):
PMIA Daily(1): 1.73%
Treasuries52.38%
Agencies20.78%
Certificates of Deposit/Bank Notes
13.17%
Time Deposits5.44%
Commercial Paper7.64%
Loans0.57%
Notes: The apportionment rate includes interest earned on the CalPERS Supplemental Pension Payment pursuant to Government Code 20825 (c)(1) and interest earned on the Wildfire Fund loan pursuant to Public Utility Code 3288 (a).
Source:(1) State of California, Office of the Treasurer(2) State of Calfiornia, Office of the Controller
PMIA Average Monthly Effective Yields(1)
PMIA/LAIF Performance Reportas of 07/09/20
Daily rates are now available here. View PMIA Daily Rates
Quarterly PerformanceQuarter Ended 03/31/20
Percentages may not total 100% due to rounding
Pooled Money Investment AccountMonthly Portfolio Composition (1)
06/30/20$101.0 billion
10-8
Website www.camponline.com Phone (800) 729-7665 Fax (415) 982-4513 Email [email protected]
2. The Trust also may publish a “monthly distribution yield.” The monthly distribution yield represents the net change inthe value of a hypothetical account with a value of one share (normally $1.00 per share) resulting from all dividendsdeclared during a month by the Pool expressed as a percentage of the value of one share at the beginning of themonth. This resulting net change is then annualized by multiplying it by 365 and dividing it by the number of calendardays in the month.
This information is for institutional investor use only, not for further distribution to retail investors, and does not representan offer to sell or a solicitation of an offer to buy or sell any fund or other security. Investors should consider the Trust’sinvestment objectives, risks, charges and expenses before investing in the Trust. This and other information about theTrust is available in the Trust’s current Information Statement, which should be read carefully before investing. A copy ofthe Trust’s Information Statement may be obtained by calling 1-800-729-7665 or is available on the Trust’s website atwww.camponline.com. While the Trust seeks to maintain a stable net asset value of $1.00 per share, it is possible to losemoney investing in the Trust. An investment in the Trust is not insured or guaranteed by the Federal Deposit InsuranceCorporation or any other government agency. Shares of the Trust are distributed by PFM Fund Distributors, Inc.,member Financial Industry Regulatory Authority (FINRA) (www.finra.org) and Securities Investor Protection Corporation(SIPC) (www.sipc.org). PFM Fund Distributors, Inc. is a wholly owned subsidiary of PFM Asset Management LLC.
CAMP Cash Reserve Portfolio
Current Annualized Yield1: 0.48%
Monthly Distribution Yields2
1. As of June 30, 2020. Past performance is not indicative of future results and yields may vary. The “current annualizedyield” of the Pool may, from time to time, be quoted in reports, literature and advertisements published by the Trust.Current annualized yield represents the net change, exclusive of capital changes and income other than investmentincome, in the value of a hypothetical account with a balance of one share (normally $1.00 per share) over a seven-daybase period expressed as a percentage of the value of one share at the beginning of the seven-day period. Thisresulting net change in account value is then annualized by multiplying it by 365 and dividing the result by 7.
.
2014 2015 2016 2017 2018 2019 2020
January 0.06% 0.07% 0.38% 0.85% 1.43% 2.62% 1.78%
February 0.07% 0.06% 0.45% 0.85% 1.50% 2.64% 1.75%
March 0.06% 0.07% 0.50% 0.89% 1.62% 2.61% 1.50%
April 0.05% 0.08% 0.48% 0.96% 1.84% 2.55% 0.98%
May 0.06% 0.08% 0.49% 0.97% 1.95% 2.52% 0.67%
June 0.06% 0.09% 0.51% 1.05% 2.05% 2.48% 0.51%
July 0.05% 0.10% 0.55% 1.12% 2.11% 2.42%
August 0.06% 0.11% 0.64% 1.14% 2.12% 2.28%
September 0.05% 0.13% 0.64% 1.15% 2.14% 2.22%
October 0.05% 0.14% 0.66% 1.17% 2.27% 2.05%
November 0.05% 0.15% 0.66% 1.20% 2.36% 1.88%
December 0.05% 0.23% 0.72% 1.29% 2.46% 1.80%
10-12
Ref: Admin.20‐14171
ENCINA WASTEWATER AUTHORITY
BOARD OF DIRECTORS
Item : 12
Date : July 22, 2020
To : Honorable Chair and Board of Directors
From : Michael Steinlicht, General Manager
Issue : JUNE 2020 TACTICAL PLAN STATUS REPORT
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Receive and file the June 2020 Tactical Plan Status Report.
BACKGROUND
The 2020 Tactical Plan describes specific activities staff will undertake during the calendar year in support of the EWA Board of Directors approved 2018‐2023 Five Year Strategic Business Plan. The Tactical Plan consists of forty‐five (45) tactical goals distributed through eight (8) Strategic Initiatives and serves as the performance evaluation basis for the General Manager and staff. This report summarizes staff’s progress toward completing the program objectives specified in the 2020 Tactical Plan.
FIVE‐YEAR BUSINESS PLAN REFERENCE
Strategic Initiative No. 8 requires EWA to provide meaningful transparency and engage key stakeholders.
DISCUSSION
As detailed in the June 2020 Tactical Plan Status Report (Attachment 2), seven (7) of the Strategic Initiatives are listed as Completed, twenty‐six (26) are In‐Progress, and twelve (12) show No Progress.
FISCAL IMPACT
There is no fiscal impact associated with this report.
COMMITTEE REVIEW
The Policy & Finance Committee reviewed this item in their July meeting and provided their support. Director Sullivan asked whether EWA is witnessing any delays or setbacks as a result of COVID‐19. General Manager Steinlicht responded stating contractors were asked to exit the EWA plant in March and therefore setback two to four weeks while pandemic plans and safety protocals were put into place. Other than these delays, progress on the Tactical Plan’s Strategic Initiatives continues to move forward as planned.
THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Receive and file the June 2020 Tactical Plan Status Report.
12-1
July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors
June 2020 Tactical Plan Status Report
Ref: Admin. 20‐14171
Attachment 1: June 2020 Tactical Plan Status Report
Prepared by: Joseph Spence, Assistant to the General Manager Reviewed by: Scott McClelland, Assistant General Manager Approved by: Michael Steinlicht, General Manager
12-2
1 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a
OUR STRATEGIC INITIATIVES EWA relies upon the strategic business planning process to align the Vision, Mission, Core Values, and Business Principles with the strategies, objectives, goals, and tasks of everyday operations. The Strategic Business Plan is a valuable tool that provides focus and direction for all employees to ensure we achieve our operational goals. Each Strategic Initiative identified below provides structure and forward guidance on items that may come before EWA’s Board of Directors and is supported by a team of employees with diverse backgrounds, skill sets and areas of expertise. Our strategic business plan represents the future of EWA.
S I – 1 Enhance Workp lace Sa fe ty , Hea l th , and Wel lness
S I – 2 Remain an Employer o f Cho ice
S I – 3 Ma inta in Regula tory Compl iance
S I – 4 Improve In f rast ruc ture Per formance and Re l iab i l i t y
S I – 5 Expand Waste Resource Recovery E f for t s
S I – 6 Cont inue F i s ca l Respons ib i l i t y and Revenue Generat ion
S I – 7 Opt imize Operat iona l Per formance
S I – 8 Engage Key S takeho lders
12-4
2 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a
2020 TACTICAL PLAN Purpose of the Tactical Plan The 2020 Tactical Plan describes specific activities staff will undertake during the calendar year in support of the Strategic Initiatives identified in EWA’s Board of Directors approved 2018-2023 Five-Year Strategic Business Plan.
Completed
= COMPLETED | In Progress
= IN PROGRESS | Delayed
= DELAYED | Not
Completed
= NOT COMPLETED
STRATEGIC INITIATIVE NO. 1: ENHANCE WORKPLACE SAFETY, HEALTH, AND WELLNESS
ID # Tactical Goal Key Performance Indicator Team Lead Target
2020 SI-1-1
Integrate the operation of the new Agua Hedionda Pump Station (AHPS) into EWA’s standardized policies & safety procedures.
Complete the AHPS lockout/tagout (LOTO), standard operating procedures and emergency response plan.
Operations Manager
July 2020
Completed
Status and Notes: Staff developed Standard Operating Procedures No. 99 documenting EWA’s policies and procedures for AHPS. With this process, staff developed seven LOTO procedures and updated the plant’s emergency bypass plan.
2020 SI-1-2
Update Encina Water Pollution Control Facility (EWPCF) Professional Qualification Standards to include Lead Operator.
Implementation of succession planning strategies through new procedures and standards with subsequent training of operational personnel.
Operations Manager
October 2020
In Progress
Status and Notes: Updating EWA’s Professional Qualification Standards is currently underway and is being tailored to more closely align with EWA’s organizational chart and expectations for incoming & advancing staff. The initial draft has been completed and is currently being reviewed.
2020 SI-1-3
Implement physical site security assessment recommendation.
Complete fortified site access (Phase I) in accordance with the newly developed site security policy.
Systems Manager
October 2020
Status and Notes:
2020 SI-1-4
Implement Heat Dryer Hazardous Operations Assessment Recommendations.
Include recommendations into the FY 2022 E-CAMP Update.
Engineering Services Manager
October 2020
Status and Notes:
12-5
3 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a
STRATEGIC INITIATIVE NO. 2: REMAIN AN EMPLOYER OF CHOICE
ID # Tactical Goal Key Performance Indicator Team Lead Target
2020 SI-2-1
Facilitate EWA’s annual health benefits fair.
Successful flex-plan enrollment of EWA employees.
Human Resources Manager
September 2020
In Progress
Status and Notes: EWA staff is working on a modified approach to hosting its annual benefits fair due to the pandemic and social distancing requirements.
2020 SI-2-2
Initiate labor relations negotiations process.
Convene representatives from employee group and execute a professional services agreement for a salary survey.
Human Resources Manager
October 2020
Status and Notes:
2020 SI-2-3
Enhance EWA’s training and succession planning efforts.
Implement job shadowing and training-up efforts to expand institutional knowledge for EWA staff.
Human Resources Manager
December 2020
Status and Notes:
STRATEGIC INITIATIVE NO. 3: MAINTAIN REGULATORY COMPLIANCE
ID # Tactical Goal Key Performance Indicator Team Lead Target
2020 SI-3-1
Develop a joint Plume Tracking Monitoring Plan (PTMP) with San Elijo Joint Powers Authority and the City of Escondido to address permit requirements for EWA’s ocean discharge permit.
Submit the PTMP to the San Diego Regional Water Quality Control Board for approval.
Director of Environmental
Compliance
April 2020
In Progress
Status and Notes: The State Water Board received and reviewed EWA’s Plume Tracking Monitoring Plan and has provided initial guidance. The resubmittal was delivered to the SWB on 6/18.
2020 SI-3-2
Complete the Sediment Monitoring Study and the Intensive Ocean Monitoring requirements in accordance with Regional Water Quality Control Board approved plans.
Submit final studies to Regional Water Quality Control Board for approval.
Director of Environmental
Compliance
December 2020
In Progress
Status and Notes: Staff initiated these efforts and anticipates advertising a Request for Proposals in August to meet the NPDES permit requirements.
12-6
4 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a
2020 SI-3-3
Review and update the Rules and Regulations for Conducting Encina Joint Advisory Committee, Encina Wastewater Authority Board of Directors, and Related Joint System Governance Committee Meetings.
Policy Finance Committee and Board of Director adoption of approved amendments.
Administrative Services Manager
October 2020
In Progress
Status and Notes: Staff is working on updating the Rules and Regulations for Conducting Encina Joint Advisory Committee, Encina Wastewater Authority Board of Directors and Related Joint System Governance Committee Meeting and will be bring these forward to the PFC for initial review once complete.
2020 SI-3-4
Determine necessary elements to modernize end‐user source control repor ng.
Assess the value that the EPA Cross-Media Electronic Reporting Rule (CROMERR) for industrial user reporting would provide to EWA’s pretreatment program.
Source Control Manager
December 2020
Status and Notes: The National Association of Clean Water Agencies (NACWA) canceled their annual conference which was instrumental in providing the needed information and guidance. Staff is reassessing other avenues to find out information.
2020 SI-3-5
Complete EWPCF Odor Control Master Plan.
Present Plan findings to the Board of Directors and include recommendations in the FY 2022 E-CAMP Update.
Capital Projects Manager
June 2020
Completed
Status and Notes: The Odor Control Master Plan has been completed. Staff presented its findings to the Board of Directors who received and filed it in their May meeting.
STRATEGIC INITIATIVE NO. 4: IMPROVE INFRASTRUCTURE PERFORMANCE AND RELIABILITY
ID # Tactical Goal Key Performance Indicator Team Lead Target
2020 SI-4-1
Complete FY 2021 R-CAMP Present R-CAMP results to the Member Agencies (Carlsbad and Vista) and include recommendations in the FY 2021 budget.
Engineering Services Manager
April 2020
Completed
Status and Notes: The FY2021 R-CAMP is complete and has been reviewed by the respective Member Agencies. The report’s financial impact and feedback received from the Member Agencies were incorporated in to the FY2021 budget.
2020 SI-4-2
Complete EWPCF condition assessments.
Present assessment results to the Capital Improvements Committee and incorporate into future annual budgets as appropriate.
Engineering Services Manager
April 2020
Completed
Status and Notes: The condition assessments are complete and their findings were presented to the CIC in their May meeting.
12-7
5 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a
2020 SI-4-3
Initiate FY 2022 E-CAMP Award professional services for the Project. Engineering
Services Manager
August 2020
Status and Notes:
2020 SI-4-4
Initiate construction on the Secondary Clarifiers Improvements Project.
Award construction contract for the Project. Engineering
Services Manager
June 2020
Completed
Status and Notes: In June, the Board of Directors awarded construction of the Secondary Clarifier Project to JR Filanc Construction Company Inc.
2020 SI-4-5
Initiate final design to remediate ground settlement at Flow Equalization basin.
Award final design services for the Project. Engineering
Services Manager
May 2020
Completed
Status and Notes: The Board of Directors awarded the Flow Equalization Basin Settlement Project Design in their February meeting.
2020 SI-4-6
Initiate final design on Solids Rotary Drum Thickening (RDT) Project
Award final design services for the Project. Director of Technical Services
July 2020
Status and Notes:
2020 SI-4-7
Complete the Cogen Emergency Wall Repair Project.
Obtain EWA Board of Directors Final Acceptance for the Project.
Capital Projects Manager
December 2020
In Progress
Status and Notes: The Cogen Emergency Wall Repair Project is currently in progress and staff regularly updates the Capital Improvement Committee on project progress. In June, the Board of Directors cured the General Manager’s award of Task Order No.2 for demolition and installation of new west wall. Currently, the contractor is in the process of replacing two of the four sections of the compromised wall.
2020 SI-4-8
Complete construction on Digester Cleaning and Coating Project.
Obtain EWA Board of Directors Final Acceptance for the Project.
Capital Projects Manager
October 2020
In Progress
Status and Notes: The Digester Cleaning and Coating Project is currently in progress and staff regularly updates the Capital Improvement Committee on project progress.
2020 SI-4-9
Complete the Primary Area Improvements Project’s phase one-of-three equipment installation.
EWA beneficial use of new equipment for Project.
Capital Projects Manager
December 2020
In Progress
Status and Notes: The Primary Area Improvements Project phase one is currently in progress and staff regularly updates the Capital Improvement Committee on project progress.
12-8
6 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a
2020 SI-4-10
Surge Tower 60-inch bypass pipe replacement Project.
Award construction contract for Project. Capital Projects Manager
October 2020
Completed
Status and Notes: In June, the Board of Directors authorized the award of a Task Order to EWA’s As-Needed General Contractor for the construction of this project.
STRATEGIC INITIATIVE NO. 5: EXPAND WASTE RESOURCE RECOVERY EFFORTS
ID # Tactical Goal Key Performance Indicator Team Lead Target
2020 SI-5-1
Initiate the development of the Biosolids Management Plan.
Award services for the Project. Engineering
Services Manager
September 2020
Status and Notes:
2020 SI-5-2
Meet with regional and key stakeholders in support of EWA’s Water Reuse initiatives.
Lobby key stakeholders to include EWA’s water resources into future water management planning and provide feedback to the Board of Directors on Water Reuse networking efforts.
Assistant General Manager
December 2020
In Progress
Status and Notes: A group of Water agencies in North County have submitted a project description and potential water supply needs that would be satisfied with an EWA Reuse Project. The group has decided to call the project North County One Water. EWA actively participates in these discussions.
STRATEGIC INITIATIVE NO. 6: CONTINUE FISCAL RESPONSIBILITY AND REVENUE GENERATION
ID # Tactical Goal Key Performance Indicator Team Lead Target
2020 SI-6-1
Update EWA’s 1993 Revenue and Financial Program.
Present findings to the Member Agency Managers, Policy & Finance Committee, and Board of Directors.
Director of Environmental
Compliance
December 2020
In Progress
Status and Notes: Staff and consultants started the update and testing process for the Revenue and Financial Program Project in late January. Carollo provided the MAM a review of the project scope, an update on the project timeline and an update on the sampling program review performed to-date during the MAM’s June meeting. Staff anticipates another progress update being provided to the MAM in August. Carollo and staff continue to review and update sampling and financial components of the program.
12-9
7 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a
2020 SI-6-2
Conduct Independent 3rd Party Annual Financial Audit and complete EWA’s Comprehensive Annual Financial Report (CAFR)
Board of Directors receive and file final report.
Administrative Services Manager
December 2020
In Progress
Status and Notes: Staff has engaged with Vasquez & Company LLP for a one-year extension for independent financial auditing services. Staff held a kick off meeting with the Independent Auditors and had preliminary field testing conducted in May.
2020 SI-6-3
South Parcel leasing and revenue generation.
Continue to engage interested parties and the EWA Board of Directors on potential leasing opportunities.
Director of Technical Services
December 2020
In Progress
Status and Notes: The Board of Directors authorized the execution of lease options with both the Energy Storage and Vehicle Storage. Staff, EWA’s General Counsel and EWA’s Broker continue to negotiate terms of the ground leases.
2020 SI-6-4
Implement Net Energy Metering options with SDG&E to reduce EWA’s electrical cost.
Obtain new energy cost structure from SDG&E.
Director of Technical Services
November 2020
In Progress
Status and Notes: Baker Electric continue the installation of the hardware required to obtain Net Energy Metering from SDG&E.
2020 SI-6-5
Prepare and publish the Recommended Fiscal Year 2021 Operating and Capital Budget.
Apply for the Government Finance Officers Association (GFOA) Distinguished Budget Presentation Award Program.
Assistant to the General Manager
July 2020
In Progress
Status and Notes: The Board approved the FY 2021 budget unanimously in their April meeting. Staff anticipates submitting the budget to the GFOA for the presentation award once the budget has been fully adopted by the Member Agencies.
2020 SI-6-6
Provide increased financial transparency with regards to South Parcel leasing.
Early adoption of Government Accounting Standards Board Statement No. 87 regarding lease accounting and disclosures.
Assistant to the General Manager
December 2020
In Progress
Status and Notes: GASB 87 standards are being adopted to provide transparent accounting of South Parcel leasing revenues and anticipates reporting back to the Policy & Finance Committee on disclosure and revenue impacts once the Comprehensive Annual Financial Report has been fully drafted.
2020 SI-6-7
Assess potential alternative power providers.
Contact potential power providers and provide update to the Board of Directors.
Assistant General Manager
December 2020
Status and Notes:
12-10
8 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a
STRATEGIC INITIATIVE NO. 7: OPTIMIZE OPERATIONAL PERFORMANCE
ID # Tactical Goal Key Performance Indicator Team Lead Target
2020 SI-7-1
Maximize digester gas utilization at EWPCF Cogen and Heat Dryer facilities.
Maintain digester gas utilization above 80% in EWPCF processes.
Operations Manager
August 2020
In Progress
Status and Notes: Digester gas utilization is being monitoring and is being maintained above the benchmark with the year-to-date utilization currently at 83%.
2020 SI-7-2
Develop an EWA Business Con nuity Plan.
Approved service agreement in place with consultant.
Administrative Services Manager
December 2020
Status and Notes:
2020 SI-7-3
Develop Disaster Recovery Plan to recover critical systems and services in a timely manner.
Perform a simulated disaster to test the data recovery process. Present findings to the Board of Directors and include in Business Continuity Plan.
Systems Manager
December 2020
In Progress
Status and Notes: EWA’s disaster recovery simulation has been performed. Findings are being evaluated and will be incorporated into the Business Continuity Plan.
2020 SI-7-4
Formalize the Information Technology Strategic Plan and Standard Operating & Maintenance Procedures in response to 2019 IT audit findings.
Implement cyber security protocols and develop long term priorities to maintain security posture.
Systems Manager
September 2020
In Progress
Status and Notes: The IT Strategic Plan has been developed and has identified goals and corresponding key performance indicators (KPI) to achieve those goals. This establishes a road map for implementation of each recommendation. As a result of this plan, staff recommended, and the Board of Directors awarded, the near-term Business Network Improvements Project in April and this effort is scheduled to be completed this summer.
2020 SI-7-5
Update Emergency Bypass Plans for new Agua Hedionda Lift Station.
Submit Emergency Bypass Plans to Member Agencies for review and approval.
Operations Manager
September 2020
Status and Notes: Existing bypass plans have been reviewed and no updates were necessary. These have been posted onsite and made available to operations staff. Further updates are pending the construction status of the new station.
2020 SI-7-6
Establish standardized methods for monitoring secondary clarifier performance
Develop and implement standardized procedures for measuring solids blanket and controlling hydraulic overflow rates.
Operations Manager
September 2020
In Progress
Status and Notes: Standardized procedures for monitoring the secondary clarifier performance are currently being developed.
12-11
9 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a
2020 SI-7-7
Assess and update EWA’s critical spares inventory.
Identify critical spares required to reduce operational down-time risks and incorporate into FY2022 budget.
CMMS Administrator
November 2020
In Progress
Status and Notes: Critical spares for each process area are being reviewed with special attention provided for systems like the heat dryer which have the potential to interrupt normal operations.
2020 SI-7-8
Implement Phase II upgrades to EWA’s Computerized Maintenance Management System (CMMS).
Develop process for cataloging all known assets and capturing their related resource management metrics in CMMS.
CMMS Administrator
August 2020
In Progress
Status and Notes: The demonstration project, which is being used to develop the process of capturing and managing assets going forward, continues and is anticipated to be completed by mid-August.
2020 SI-7-9
Provide operation, maintenance, and administrative support of EWA contract-operated remote facilities.
Submit quarterly reports to Member Agencies and hold meetings as required.
Director of Operations
December 2020
In Progress
Status and Notes: Regular reporting and virtual meetings continue to be developed and made available to the Member Agencies.
2020 SI-7-10
Digi ze EWA’s historical paper archives.
Determine the appropriate enterprise pla orm and develop a Request for Proposals. Incorporate so ware and hardware costs in FY2022 budget.
Administrative Services Manager
December 2020
In Progress
Status and Notes: Staff is working on developing the scope of work for the implementation of a Sharepoint platform. Staff anticipates bring a recommendation forward to PFC or CIC in August or September.
STRATEGIC INITIATIVE NO. 8: ENGAGE KEY STAKEHOLDERS
ID # Tactical Goal Key Performance Indicator Team Lead Target
2020 SI-8-1
Update CWRF Memorandum of Understanding (MOU) with Carlsbad to reflect new UF system operations.
Obtain EWA Board of Directors, Joint Advisory Committee, and City of Carlsbad City Council approval of CWRF MOU.
Director of Operations
September 2020
In Progress
Status and Notes: The CWRF MOU has been updated and is currently being reviewed by the City of Carlsbad.
2020 SI-8-2
Conduct risk assessments for remote pump station facilities.
Engage Member Agency staff to jointly conduct pump station risk assessments and integrate into annual pump station report.
Director of Operations
July 2020
Status and Notes:
12-12
10 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a
2020 SI-8-3
Investigate the effects of PFAS on waste resource recovery efforts.
Provide feedback on findings and recommendations to Member Agencies and develop PFAS public informational flyer.
Director of Operations
August 2020
In Progress
Status and Notes: The State Water Board Continues to develop PFAS Investigative Order Phase 3 for sampling of Wastewater Treatment Plants. Water Board’s PFAS investigative team will meet in June to discuss sampling requirements of their forthcoming Phase 3 Order. US EPA extended the comment period from May 11 to June 10 for a preliminary regulatory determination to regulate PFOS and PFOA in drinking water.
2020 SI-8-4
Engage key stakeholders to address the flood control channel’s flow impedance and downstream vegetation growth.
Coordinate with key stakeholders to develop plan to remediate the Flood Control Channel’s restricted flow capacity.
Assistant General Manager
December 2020
In Progress
Status and Notes: Staff has contacted Sea Pointe Development and North County Transit District to discuss actions to remediate the flow capacity. Staff will continue to work with these entities to make progress on addressing the situation.
12-13
Ref: Admin.20‐14165
ENCINA WASTEWATER AUTHORITY
BOARD OF DIRECTORS
Item : 13
Date : July 22, 2020
To : Honorable Chair and Board Members
From : Michael Steinlicht, General Manager
Issue : AUDITORS’ COMMUNICATION WITH THOSE CHARGED WITH GOVERNANCE
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Receive and file the Independent Auditors’ Communication in relation to the annual audit of EWA’s
financial statements.
BACKGROUND
Section 13.1.9 of the Revised Basic Agreement requires the preparation of an annual independent audit
of EWA’s financial statements. Section 2.9.2 of the Revised Establishment Document requires EWA’s
annual independent audit to conform to requirements established for special districts by the State
Controller and generally accepted accounting principles (GAAP). Statements on Auditing Standards (SAS)
are promulgated by the Auditing Standards Board of the American Institute of Certified Public
Accountants and provide guidance to independent auditors on GAAP. SAS No. 114 establishes standards
for the Independent Auditors’ Communication with Those Charged with Governance in relation to an audit
of financial statements. The Board of Directors is charged with governance in relation to EWA’s annual
independent audit.
FIVE‐YEAR STRATEGIC BUSINESS PLAN REFERENCE
Tactical Goal No. 2020‐SI‐6‐2 requires EWA to have an independent 3rd party annual financial audit
conducted.
DISCUSSION
On January 25, 2017, the Board of Directors approved an agreement with Vasquez & Company, LLP,
Certified Public Accountants (Vasquez), to provide EWA with independent financial auditing services for 3
years with the option to renew for up to 2 additional 1‐year periods. Vasquez has initiated the preliminary
review portion of the FY2020 independent audit of EWA’s financial statements. As EWA’s independent
auditor, Vasquez is responsible for forming and expressing an opinion about whether the financial
statements that have been prepared by management are fairly stated and presented in conformity with
GAAP.
SAS are promulgated by the Auditing Standards Board of the American Institute of Certified Public
Accountants and provide guidance to independent auditors on GAAP. SAS No. 114 establishes standards
for the Independent Auditors’ Communication with Those Charged with Governance in relation to an audit
13-1
July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors
Auditors’ Communication with Those Charged with Governance Page 2
Ref: Admin.20‐14165
of financial statements. The Board of Directors is charged with governance in relation to EWA’s annual
independent audit.
SAS 114 further provides a framework for the Independent Auditors’ Communication with the Board of
Directors and identifies specific matters to be communicated with them. The principal purposes of
communication with those charged with governance are to:
I. Communicate clearly with those charged with governance the responsibilities of the independent
auditor in relation to the audit of EWA’s financial statements and an overview of the scope and
timing of the audit.
II. Obtain from those charged with governance information that is relevant to the audit.
III. Provide those charged with governance with timely observations arising from the audit that are
relevant to their responsibilities in overseeing the financial reporting process.
Vasquez SAS 114 communication letter dated May 20, 2020 is presented as Attachment 2. This letter is
intended to encourage two‐way dialogue between Vasquez and the Board of Directors, and to
communicate important information related to the independent audit to the Board of Directors including:
the independent auditors’ responsibilities under GAAP; the planned scope and timing of the independent
audit; and how to contact Vasquez in the event a member of the Board of Directors is aware of matters
that have a material bearing on EWA’s financial statements.
Vasquez will communicate significant findings to the Board of Directors at the conclusion of its
independent audit – typically in the November – December timeframe. However, some matters may be
communicated sooner particularly if significant difficulties are encountered during the audit or if it
appears that there are significant internal control or other issues that could lead to a modified opinion.
COMMITTEE REVIEW
The Policy and Finance Committee reviewed this item in their July meeting and approved staff’s
recommendation.
FISCAL IMPACT
There is no fiscal impact associated with this item.
THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Receive and file the Independent Auditors’ Communication in relation to the annual audit of EWA’s
financial statements.
Attachment 1: Auditors’ Communication with Those Charged with Governance
Prepared by: LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor Reviewed by: Scott McClelland, Assistant General Manager Approved by: Michael Steinlicht, General Manager
13-2
Ref: Admin.20‐14166
ENCINA WASTEWATER AUTHORITY
BOARD OF DIRECTORS
Item : 14
Date : July 22, 2020
To : Honorable Chair and Board of Directors
From : Michael Steinlicht, General Manager
Issue : FY 2022 E‐CAMP UPDATE AWARD
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Authorize the General Manager to execute a Professional Services Agreement with Kennedy/Jenks Consultants (K/J) in the amount not to exceed $149,985 for Engineering Services for the FY 2022 E‐CAMP Update.
BACKGROUND
Established in 1993, the Encina Comprehensive Asset Management Plan (E‐CAMP) is a planning tool that is updated every two years to cost effectively manage assets over their full life cycle by planning and prioritizing asset rehabilitation and replacement for the Encina Water Pollution Control Facility (EWPCF). A new E‐CAMP update is needed to prepare for the FY 2022 budgeting effort. On March 22, 2017, the Board of Directors authorized the General Manager to execute a professional services agreement with Kennedy/Jenks Consultants (K/J) for the FY 2018 E‐CAMP Update, with the option to extend those services for additional years for additional E‐CAMP efforts. Based on K/J’s ability to effectively complete the effort, staff recommends K/J continue to be utilized for the FY 2022 E‐CAMP. This authorization exceeds the General Manager’s authority and therefore requires Board approval.
FIVE‐YEAR STRATEGIC BUSINESS PLAN REFERENCE
Strategic Initiative SI‐4‐3: Initiate FY 2022 E‐CAMP.
DISCUSSION
EWA strives to conduct sound planning to maintain reliable and cost‐effective service, as well as to invest appropriately to fully fund the cost of service, including capital improvements. The E‐CAMP is regularly updated to help EWA establish a roadmap and budget for the upcoming years to more effectively manage infrastructure at EWPCF.
The E‐CAMP process includes five task elements: project identification; project evaluation; cost estimating; prioritization; and implementation schedule. The focus of most projects identified for the EWPCF in the E‐CAMP are safety, regulatory compliance, reliability, public and EWA impacts, energy or organizational related. The projects are prioritized, and a six‐year project implementation schedule for FY 2022 through FY 2027 is developed using sound engineering and financial planning principles. While the
14-1
July 22,2020 Encina Wastewater Authority (EWA) Board of Directors
FY 2022 E‐CAMP Update Award
Ref: Admin.20‐14166
E‐CAMP is independent of the budgeting process, the information is leveraged in the budgeting process and provides direction to allow staff at EWA to address infrastructure needs.
On March 22, 2017, the Board of Directors authorized the General Manager to execute a professional services agreement with K/J for the FY 2018 E‐CAMP Update. K/J was selected from five consultants that submitted proposals in the Request for Proposals (RFP) for E‐CAMP and R‐CAMP Updates. The RFP identified that the selected consultant could be eligible for additional years of similar services if EWA is satisfied with their effort. In each subsequent year since the original selection, K/J has completed the E‐CAMP or R‐CAMP. Although this current effort is beyond the original duration identified in the RFP, staff recommends K/J be utilized for the FY 2022 E‐CAMP because of their depth of knowledge and ability to effectively complete the effort without the need to educate a different consultant on EWPCF and the E‐CAMP process. Under this authorization, the E‐CAMP update will consist of meetings with EWA staff, document review, site assessments, project development, project scoring, cost estimating, and implementation schedule development. Staff has negotiated the attached scope and fee for the proposed authorization.
FISCAL IMPACT
The fiscal impact of this recommendation is $149,985. Sufficient appropriations are available in the FY 2021 Capital Improvement Program budget to support this action.
MEMBER AGENCY MANAGER REVIEW
The Member Agency Managers were briefed on this item in their July meeting and provided their support.
COMMITTEE REVIEW
The Capital Improvement Committee reviewed this item in their July meeting and approved staff’s recommendation.
THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Authorize the General Manager to execute a Professional Services Agreement with Kennedy/Jenks Consultants (K/J) in the amount not to exceed $149,985 for Engineering Services for the FY 2022 E‐CAMP Update.
Attachment 1: FY 2022 E‐Camp Update Proposal
Prepared by: Lindsey Stephenson, Engineering Services Manager Reviewed by: Scott McClelland, Assistant General ManagerApproved by: Michael Steinlicht, General Manager
14-2
9325 Sky Park Court, Suite 300 | San Diego, CA 92123
858-676-7505 | [email protected]:\2019\1944105.00_ewa_fy2021 r-camp\01-prejobinfo\fy2022 e-camp\cover letter_fy2022 e-camp update_062420.docx
24 June 2020
Mr. Tucker Southern Director of Technical ServicesEncina Wastewater Authority 6200 Avenida EncinasCarlsbad, California 92011-1009
Subject: Proposal for Professional Engineering ServicesFY2022 Encina Comprehensive Asset Management Plan
Dear Mr. Southern:
Kennedy/Jenks Consultants (Kennedy Jenks) is pleased to submit this proposal to Encina Wastewater Authority (EWA) for professional engineering services for the FY2022 Encina Comprehensive Asset Management Plan (E-CAMP). The major elements to be included in this update consist of the following:
Document review and site assessmentDevelop and update project descriptions.Develop and update project scoring, costs, and implementation schedule.Prepare the FY2022 E-CAMP.
Attached is our detailed scope of services and proposed fee spreadsheet. If there is any additional information you need or any matter you wish to discuss, please feel free to contact Tim Waters at 858-676-7528, or myself at 858-676-7505.
Very truly yours,
KENNEDY/JENKS CONSULTANTS, INC.
Corey YoungVice President
Enclosures (2)
14-4
Page 1 of 5
ATTACHMENT A
Encina Wastewater Authority
FY2022 Encina Comprehensive Asset Management Plan
Kennedy Jenks Scope of Services
GENERAL
The Encina Comprehensive Asset Management Plan (E-CAMP) is used to develop a comprehensive and reliable budgeting process to successfully address the Encina Water Pollution Control Facility (EWPCF) infrastructure needs and challenges. The major elements to be included in the FY2022 E-CAMP consist of the following:
Document review and site assessment. Develop and update project descriptions. Develop and update project scoring, costs, and implementation schedule. Prepare the FY2022 E-CAMP.
The following describes Kennedy Jenks’ proposed scope of services for the FY2022 Encina Comprehensive Asset Management Plan.
SCOPE OF WORK
Task 1 – Document Review and Site Assessment
1.1 Document Review EWA will provide Kennedy Jenks with previous condition assessments, facility needs assessments, recent studies, and the existing major asset register for the EWPCF. Kennedy Jenks will review the documents provided by EWA prior to performing the site assessment (Task 1.2). 1.2 Site Assessment
Kennedy Jenks will perform a visual condition assessment of the EWPCF by a multi-disciplinary team of mechanical, structural, and/or electrical/instrumentation engineers to understand project concepts being discussed and confirm conditions in the field. The assessment will be performed over a two (2) day period. The visual assessment will include documenting and evaluating the major assets of the EWPCF. Kennedy Jenks’ team will note deficiencies not identified in the previous condition assessments that are identified during the site assessment, such as deterioration or degradation of structural, electrical, instrumentation, and/or mechanical items. It is assumed that EWA staff will accompany the Kennedy Jenks team during the condition assessment. Kennedy Jenks will summarize the conclusions of the site assessment for review with EWA staff regarding incorporation into the FY2022 E-CAMP. It is assumed that the conclusions of the site assessments will be reviewed and discussed as part of one of the monthly progress meetings (Task 5.3). It is also assumed that the visual condition assessment of the EWPCF by the Kennedy Jenks team over the two (2) day period will be a high-level assessment for the purposes of identifying major projects that may be included in the FY2022 E-CAMP and informing what additional and more detailed condition assessments of the EWPCF facilities may be required (to be
14-6
Page 2 of 5
performed under a separate contract). It is anticipated that EWA will use the results of the visual condition assessment to help draft the upcoming condition assessment plan.
Task 2 – Develop Project Descriptions
2.1 Project Descriptions
Kennedy Jenks will develop project descriptions for new projects that were not included in the FY2020 E-CAMP. This will include new projects identified by EWA staff, condition assessments, studies, reports, and other engineering services performed for EWA. Each project will be assigned a number and the description will be formatted to be consistent with the existing descriptions (background, description, justification and project delivery method). It is assumed that project descriptions for up fifteen (15) new projects will be developed. Project descriptions for existing projects will be used from their source documents.
2.2 Project Review Meeting
Kennedy Jenks will meet with EWA (assumed to be one 4-hour workshop) to review and discuss the draft project descriptions.
Task 3 – Develop Project Scoring, Costs and Implementation Schedule
3.1 Project Scoring Workshop
Kennedy Jenks will meet with EWA staff in a workshop setting (assumed to be one 4-hour workshop) to walk through the FY2022 E-CAMP projects and assign impact factors for each project against the established evaluation criteria. From the outcome of this workshop, projects to be included in the FY2022 E-CAMP will be assigned an evaluation score.
3.2 Cost Estimates
Kennedy Jenks will develop cost tables for each new project (up to 15) with enough detail to determine the basis for each estimate. Cost estimates will be tied to the Engineering News Record Construction Cost Index (ENR CCI) for the Los Angeles area. Existing cost estimates for previously identified projects that are in the FY2020 E-CAMP, and will be in the FY2022 E-CAMP, will be updated based on the ENR CCI.
3.3 Implementation Schedule
Identified projects will be ranked, and priorities set, in conjunction with EWA staff using the evaluation scoring results and cost estimates. After the project prioritization process, a six-year implementation schedule, with projected cost estimates, will be developed by Kennedy Jenks with assistance from EWA staff and within the constraints of the EWA capital budgeting process. It is assumed that the presentation format and breakdown of costs in the implementation plan for the FY2022 E-CAMP will be similar to the presentation in the FY2020 E-CAMP. The cost loaded implementation schedule will be reviewed with EWA staff in consideration of its overall financial plan to confirm funding availability. Subsequent adjustments to the cost loaded schedule will then be made to keep project scheduling in line with funding availability.
14-7
Page 3 of 5
Task 4 – Prepare FY2022 E-CAMP
4.1 Draft Report
Utilizing the information developed in Tasks 1-3 above, Kennedy Jenks will prepare the Draft FY2022 E-CAMP, which will include updates to the contents of the FY2020 E-CAMP, including the following sections and appendices:
Executive Summary Introduction Encina Comprehensive Asset Management Plan Process Condition Assessment Summary Studies and Other Professional Services Identification of Projects Project Evaluation and Prioritization Recommended Project Implementation Schedule & Cost Summary Appendices
o Historical Project List o Capital Project List o Basis of Estimate o Project Cost Tables o Condition Assessment Summary o Major Asset Register
The Draft FY2022 E-CAMP will be electronically submitted in WORD and a compiled PDF format to EWA for one round of review and comments.
4.2 Final Report
It is assumed that Kennedy Jenks will receive one set of consolidated comments on the Draft FY2022 E-CAMP from EWA and will discuss EWA’s comments on the Draft FY2022 E-CAMP as part of one of the monthly progress meetings (Task 5.3). Kennedy Jenks will then address comments received from EWA and the Final FY2022 E-CAMP will be electronically submitted in PDF format, and up to ten (10) hardcopies provided, to EWA. Additionally, an electronic version of the native files (WORD, EXCEL, etc.) of the Final FY2022 E-CAMP will be provided to EWA.
Task 5 – Project Management and QA/QC
5.1 Management
This task addresses the management responsibilities associated with proper scheduling review, budget control, invoice preparation and coordination with EWA’s and Kennedy Jenks’ project team.
5.2 Project Kick-Off Meeting
The project kickoff meeting will be held within one week from receipt of a NTP. This meeting will include representatives from the EWA and Kennedy Jenks. At this kickoff meeting, project reporting/communication protocols will be established, the schedule will be reviewed, information requests will be made, and any key issues will be discussed.
14-8
Page 4 of 5
5.3 Monthly Progress Meetings
Kennedy Jenks will attend up to five (5) monthly progress meetings with EWA staff to provide updates on project deliverables and allow further discussion of the project. Kennedy Jenks will prepare an agenda and presentations slides (as appropriate) for EWA’s review prior to each meeting/workshop. Draft meeting minutes with action items will be distributed within five (5) working days following the meeting. Kennedy Jenks will incorporate EWA’s comments and distribute a final record of the meeting minutes.
5.4 QA/QC
Kennedy/Jenks will perform a review of all deliverables including reports, calculations, cost estimates, etc. prior to delivery.
FEE ESTIMATE
The fee estimate for the above described services is in included in Attachment B.
SCHEDULE
The following summarizes the anticipated project schedule for the FY2022 E-CAMP assuming EWA authorizes Kennedy Jenks to proceed by the end of July 2020, an EWA review time of fourteen (14) calendar days, and the other applicable assumptions listed below. Based on this anticipated schedule, Kennedy Jenks will submit the Final FY2022 E-CAMP by February 2021.
Authorization to Proceed July 2020
Perform Condition Assessment Study August 2020
Submit Draft Project Descriptions September 2020
Submit Final Project Descriptions October 2020
Submit Draft Cost Estimates October 2020
Submit Final Cost Estimates November 2020
Submit Draft E-CAMP December 2020
Submit Final E-CAMP February 2021
ASSUMPTIONS
1. The structure of the FY2022 E-CAMP will be similar to that of the FY2020 E-CAMP.
2. All materials (TMs, condition assessments, reports, cost estimates, new projects identified by EWA staff, etc.) will be provided by EWA to Kennedy Jenks within one week of the authorization to proceed.
3. The condition assessment will be a visual assessment only. No destructive testing will be performed as part of the condition assessment.
4. EWA staff will accompany the Kennedy Jenks team during the condition assessment.
14-9
Page 5 of 5
5. The visual condition assessment of the EWPCF by the Kennedy Jenks team over the two (2) day period will be a high-level assessment for the purposes of identifying major projects that may be included in the FY2022 E-CAMP and informing what additional and more detailed condition assessments of the EWPCF facilities may be required (to be performed under a separate contract). It is anticipated that EWA will use the results of the visual condition assessment to help draft the upcoming condition assessment plan.
6. The project evaluation criteria used in the FY2020 E-CAMP will be used in the FY2022 E-CAMP with no changes made.
7. After the project review meeting and final project descriptions are submitted to EWA, no additional projects identified will be included in the FY2022 E-CAMP.
8. If a cost estimate has already been prepared for a project by others, Kennedy Jenks will use that cost estimate in the FY2022 E-CAMP. Kennedy Jenks will develop Class IV cost estimates only for new projects with no previous cost estimate developed.
9. The scope of work includes one round of review and comments by EWA for the project descriptions, cost estimates, and E-CAMP. For each review, Kennedy Jenks will receive one set of consolidated comments from EWA.
10. EWA will provide Kennedy Jenks with the following:
a. List of assets that will be included in the FY2022 through FY2027 Condition Assessments.
b. List and description of studies and professional services to be included in the FY2022 E-CAMP that are not included as, or part of, an E-CAMP project.
c. Input on updates to the historical projects list appendix in the E-CAMP.
d. Updated Major Asset Register which is maintained by EWA.
EXCLUSIONS
The following services are not included within the Kennedy Jenks's current Scope of Work:
1. Any additional and more detailed condition assessments of the EWPCF facilities are not included and would be performed under a separate contract.
14-10
Task
1 -
Subt
otal
Task
2 -
Subt
otal
Task
3 -
Subt
otal
Task
4 -
Subt
otal
Task
5 -
Subt
otal
14-12
Ref: Admin.20‐14167
ENCINA WASTEWATER AUTHORITY
BOARD OF DIRECTORS
Item : 15
Date : July 22, 2020
To : Honorable Chair and Board of Directors
From : Michael Steinlicht, General Manager
Issue : FY 2021 ANNUAL SCADA SUPPORT SERVICES
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Authorize the General Manager to award a Task Order to Enterprise Automation (EA) in the amount of $160,007 for FY 2021 Annual SCADA Support Services.
BACKGROUND
Encina Wastewater Authority’s (EWA) Supervisory Control and Data Acquisition (SCADA) System is a critical asset that monitors, controls, and collects critical data necessary for the operation of the wastewater treatment process. Like any other critical asset and piece of technology, SCADA requires routine maintenance and minor upgrades to sustain system performance. In October 2017, the Board awarded an As‐Needed Professional Services Agreement to Enterprise Automation (EA) for programmatic SCADA systems integration and support. Under this effort, EA will provide SCADA integration and support services for that routine maintenance and upkeep. The recommendation exceeds the General Manger’s authority and therefore requires Board of Directors’ approval.
FIVE‐YEAR BUSINESS PLAN REFERENCE
Strategic Initiative No. 4: Improve Infrastructure Performance and Reliability
DISCUSSION
The Supervisory Control and Data Acquisition (SCADA) system provides EWA staff with the ability to monitor, control, and store data for the wastewater treatment process and pump station operation. EWA has embarked on a multi‐year effort to create a more standardized, centralized, and upgraded SCADA system that entails a more programmatic approach to the operational technology. In support of this effort, EA was brought on in October of 2017 to provide programmatic SCADA integration services for five years. Since then, EA has provided annual services for routine SCADA maintenance and upgrades.
Under this authorization, EA will once again provide the following SCADA integration and support services through fiscal year 2021:
15-1
July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors
FY 2021 Annual SCADA Support Services
Ref: Admin.20‐14167
1. On Call Support: This task is for miscellaneous support services, including phone calls, technical investigations, 24 hours a day – 7 days per week support, annual planning meetings, and miscellaneous meetings in which EA is requested to participate.
2. Windows Server Update Services (WSUS) Updates: This effort will implement the latest Windows Server Updates.
3. SCADA Training: This task includes efforts to train staff on the SCADA system, with an emphasis on the new SCADA platform.
4. Programming Change Requests (CR): This effort includes the collection, management, and implementation of programming changes identified to improve SCADA operation or function.
5. Software Support Renewals: This item extends service support for multiple versions of software on the new SCADA platform.
These annual services are important efforts to maintain SCADA system performance and improve functionality.
MEMBER AGENCY MANAGER REVIEW
The Member Agency Managers were briefed on this item in their July meeting and provided their support.
COMMITTEE REVIEW
The Capital Improvement Committee reviewed this item in their July meeting and approved staff’s recommendation.
FISCAL IMPACT
The total fiscal impact of staff’s recommendation is $160,007. Sufficient appropriations are available in the Fiscal Year 2021 Capital Improvement Program Budget.
THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:
Authorize the General Manager to award a Task Order to Enterprise Automation (EA) in the amount of $160,007 for FY 2021 Annual SCADA Support Services.
Attachment 1: EA Proposal for FY 2021 Support Services
Prepared by: Lindsey Stephenson, Engineering Services Manager Reviewed by: Scott McClelland, Assistant General Manager Approved by: Michael Steinlicht, General Manager
15-2
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 1 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
Scope of WorkFY2021 Annual Support
for
Encina Wastewater Authority
Job Number EA20EWA063
Document Revision 1.0.0
Effective Date 7/1/2020
Author Marshall McElroy
15-4
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 2 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
History
Revision Date Description of Change Author Reviewed
1.0.0 7/1/2020 Original MM LS
Table of Contents 1 Proposal Background ............................................................................................................................ 4 2 Scope of Work ....................................................................................................................................... 5
2.1 Project Management ..................................................................................................................... 5 2.2 On Call Support ............................................................................................................................. 5 2.3 WSUS Updates ............................................................................................................................. 8 2.4 SCADA Training ............................................................................................................................ 9 2.5 CRs ............................................................................................................................................... 9 2.6 Software Support .......................................................................................................................... 9
3 Assumptions & Clarifications ............................................................................................................... 10 4 Cost Estimate ...................................................................................................................................... 10
4.1 Materials ...................................................................................................................................... 10 4.2 Travel .......................................................................................................................................... 10
5 Terms & Conditions ............................................................................................................................. 11 6 Conclusion ........................................................................................................................................... 11 Appendix A: Cost Estimate Details ............................................................................................................. 12
15-5
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 3 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
Acronyms and Terms For the remainder of the document the following acronyms will be used.
Term Description
CR SCADA Change Request
EA Enterprise Automation (Integrator)
FAT Factory Acceptance Test
HMI Human Machine Interface
O&M Operation and maintenance manuals
OIT Operator Interface Terminal, stand-alone graphical interface typically found on standalone equipment or remote sites
PLC Programmable Logic Controller
PM Project Manager
SAT Site Acceptance Test
SCADA Supervisory Control and Data Acquisition (refers to the entire automation system)
Encina, the Authority
Encina Wastewater Authority
15-6
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 4 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
1 Proposal Background Enterprise Automation (EA) has been providing support for Encina Wastewater Authority SCADA assets since October 2017.
Originally, EA was engaged help develop a new SCADA system, while providing as needed support for legacy items. Throughout several projects with the Authority, EA has gained extensive knowledge and experience with all the Authority’s SCADA assets.
This document has been drafted to provide the Authority with the close cooperation and comprehensive coverage they are seeking to maintain the health of their SCADA control system.
This proposal includes budget from Annual Planning for the following items:
Annual General Support 2021
Annual WSUS Updates 2021
Annual SCADA Training 2021
Annual EWPCF CR Budgets 2021
Annual Software Support 2021
Along with the Annual Planning items, this proposal’s budget may also be used for ad-hoc and miscellaneous meetings which do not strictly fall under a specific project but are requested by the Authority.
15-7
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 5 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
2 Scope of Work This section details the scope of work for tasks included in the estimate in Appendix A.
2.1 Project Management EA will provide standard project management support for the duration of this annual support.
2.2 On Call Support
2.2.1 Basis This SCADA Support Contract provides details of the agreement between:
Encina Wastewater Authority
and
Enterprise Automation
2.2.2 Facilities Covered The services provided under this SCADA Support Contract are solely for the following facilities:
a) Encina Water Pollution Control Facility 6200 Avenida Encinas Carlsbad, CA 92011
2.2.3 Contact Details The Engineering Services Manager contact for the Authority is:
The Systems Manager contact for the Authority is:
15-8
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 6 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
2.2.4 Nature of Services The services provided by Enterprise Automation under this SCADA Support Contract are limited to the following systems:
a) SCADA software a. Schneider Electric
i. EcoStruxure Hybrid DCS ii. Wonderware Historian iii. Top View Alarm Paging Software iv. SCADA SSRS Reports
b) Rockwell/Allen Bradley a. RSView 32 b. Factory Talk SE c. Historian
c) PLC types and brands a. Schneider Electric
i. M580 PLCs b. Allen Bradley
i. PLC-5 ii. SLC-500 iii. ControLogix iv. Flex I/O v. Micrologix
d) OITs Types and Brands a. Allen Bradley
i. Panel View e) SCADA Domain PCs, Virtual Machines f) Associated SCADA networking (Cat 5/6 and fiber) g) Associated SCADA panels and I/O h) Schneider Electric VFDs i) Schenider Electric TeSys-Ts
2.2.5 Excluded Equipment The Authority has some specialized equipment with which EA does not have specific expertise. As these systems interact with the supported equipment, EA will assist with
15-9
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 7 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
diagnosing problems where possible; however the equipment is not supported by Enterprise Automation under this agreement. Equipment not supported is as follows:
a) General process equipment (Valves, pumps, motors, etc.)
b) Security systems
c) Electrical systems (MCC buckets, medium/high voltage equipment)
2.2.6 Services Provided As the Authority makes support requests, the EA project manager will work with the Authority to set an initial scope and budget for the support call, obtain approval from the Authority to proceed, and create a new budget item to track support on a case by case basis. This procedure is intended to ensure that the budget is used with discretion. If the initial budget for a support call will exceed the original estimate, the EA project manager will discuss the matter with the Authority.
2.2.6.1 Phone Support
Phone support will be provided 24 hours 7 days a week. After hours support is for critical problems only that are threatening safety or production.
Phone support is the first tier of support provided
2.2.6.2 Remote Support
Although remote support is not currently in place for the Authority, Enterprise Automation would like the opportunity to discuss setting up remote support.
To implement remote support, EA would like to establish a remote access connection to the WTP. EA intends to work with the Authority to implement the remote access connection so it can be leveraged in the future.
Remote support is the second tier of support provided, and will be provided when phone support options have been exhausted.
2.2.6.3 On-site Support
Where necessary, EA engineers will be available for on-site support, with the Authority receiving priority scheduling.
On-site support is the third tier of support provided, and will be provided when phone support and remote support options have been exhausted.
15-10
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 8 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
2.2.7 Requesting Support
2.2.7.1 Phone Call Response Times
EA will attempt to respond to any phone call within one hour. In general, Enterprise Automation will be able to begin troubleshooting a problem immediately after being contacted.
2.2.7.2 On-Site Response Times
The Authority will receive priority scheduling should on-site support be required. An engineer will therefore be dispatched to site as soon as practical.
Note that EA is located approximately 50 miles from the Authority’s facilities, and that travel time can vary from 45 minutes to 2 hours, depending on traffic conditions. Time must also be allowed for the engineer to prepare for the trip.
2.3 WSUS Updates
2.3.1 Microsoft Updates The Authority’s SCADA system consists of many computers, which require updates from Microsoft on a regular basis. The Authority’s SCADA system uses a Microsoft server-grade operating system service called Windows Server Update Services (WSUS) to manage the updates. The Authority’s IS is in control of the WSUS server onsite, Enterprise Automation (EA) controls the WSUS server on the test platform.
The key steps to the WSUS update process are:
1. EA will install and test all updates on the Authority’s test platform
2. Once the updates are proven to not interfere, EA will supply a summary report tothe Authority’s IS confirming which updates are safe for release.
3. The Authority’s IS can install updates according to EA’s report
The key advantage of this process is that it allows EA to test all updates on a replica of the onsite system, ensuring the updates do not interfere with SCADA operations (e.g. communication drivers, Windows firewalls, etc.), prior to them being installed onsite.
2.3.2 Update Failure Should an update affect the integrity of the SCADA system, EA will investigate the issue and identify a solution. Solutions may include skipping installation of the specific update(s), requesting SCADA software manufacturer support (patches, hotfixes, etc.), or identifying alternatives as recommended by Microsoft.
15-11
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 9 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
If required, EA will perform all safe updates on-site, excluding the failed update, so that the SCADA system on-site is as current as possible. This is to be confirmed by the Encina IT department.
Budget to fix failed updates would be handled as a separate CR.
2.3.3 Test Platform Updates EA has included time to apply firmware updates and VMware ESXi updates (“Remediation”) on the Authority’s test platform servers.
All onsite updates will be carried out by the Authority’s IS.
2.4 SCADA Training EA will prepare a training manual or manuals for each topic to be covered under this training portion. Topics will be decided upon via conference call with the Authority’s personnel.
EA will perform as many training sessions for the Authority’s staff onsite in one day as the budget in Attachment A allows.
2.5 CRs CRs will be investigated per EWA SPECC CR System Process 1.0.0 for each request, and then estimates provided to EWA to authorize proposed solutions. Significant efforts may be authorized via separate task order.
2.6 Software Support EA will procure the following software items for the Authority during FY21:
HDCS Support Renewal – 18 months, New exp 12/31/2021
Historian Renewal – 12 months, New exp 12/23/2021
TopView Support Renewal – 12 months, New exp 12/31/2021
Citect Anywhere Renewal – 12 months, New exp 1/31/2022
EA will work to get these software support items on the same cycle (Dec. renewals) during this FY, where previously HDCS was not.
15-12
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 10 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
3 Assumptions & Clarifications The following assumptions and clarifications were used in preparing this proposal:
1. The Authority must approve all use of this support budget, it is assumed approval must come from Lindsey Stephenson and Dave Ummel. The Authority may add additional personnel with authority to approve support requests by contacting the EA project manager.
2. The WSUS portion of the scope only applies to the new Hybrid DCS SCADA Servers and VMs
3. The Authority’s SCADA test platform is located at EA’s office in Irvine, CA
4. In some cases, EA may recommend a partial list of SCADA computers to update, typically because ongoing project work on the test platform prevents the proper testing procedure. This will be explained in all reports sent to the Authority’s IS
5. The Authority’s IS is responsible for installing updates, firmware, remediation on the production SCADA computers
6. The scope does not include time to troubleshoot extended problems, should a significant issue arise, EA will work with the Authority management and the Authority’s IS to resolve the issue using an alternate source of funding
4 Cost Estimate The tasks to be performed along with the estimated time to complete the tasks are detailed in the attached cost estimate (Appendix A).
4.1 Materials Budget has been included for EA to procure the annual software support items. These items are in the attached cost estimate (Appendix A).
4.2 Travel All travel is billed at cost according to the U.S. General Services Administration (GSA) for hotel and per diem rates and the IRS standard mileage rate as of 7/1/2020.
15-13
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 11 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
5 Terms & Conditions Terms and conditions are as per the following contract dated October 25th, 2017:
PROFESSIONAL SERVICES AGREEMENT
BETWEEN ENCINA WASTEWATER AUTHORITY
AND ENTERPRISE AUTOMATION
FOR AS-NEEDED PROFESSIONAL SERVICES FOR
SCADA SYSTEM INTEGRATION AND SUPPORT
6 Conclusion I welcome any further discussion that may facilitate the refinement of this scope of work. Please contact me at (949) 769-6000 or alternatively on my cell phone at (702) 497-4505 with any questions.
Submitted by
Luke Stephenson
15-14
Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com
Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 12 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx
Appendix A: Cost Estimate Details
15-15
Clie
nt:
En
cin
aP
roje
ct:
F
Y20
21 A
nn
ual
Su
pp
ort
Num
ber:
EA
20E
WA
063
D
ate:
7/1
/202
0
Rev
isio
n: 1
.0.0
A
utho
r: M
M
Rev
iew
ed B
y: L
S
Su
mm
ary
Pro
ject
En
g.
Le
ad
En
g.
PM
Arc
hite
ctP
roje
ct E
ng
.L
ea
d E
ng
.P
MA
rch
itect
Ho
urs
Pri
ce
EN
G O
n C
all S
uppo
rt60
2420
016
1610
014
6$3
2,18
0E
NG
WS
US
Upd
ates
503
80
00
00
61$1
2,87
5E
NG
SC
AD
A T
rain
ing
3612
90
012
00
69$1
5,18
0E
NG
CR
s10
690
290
00
00
225
$49,
840
En
gin
eeri
ng
Lab
or
To
tals
252
129
660
1628
100
501
$110
,075
Exp
ense
sP
rice
$49,
420
$513
To
tal E
xpen
ses
$49,
932
Gra
nd
To
tal
$160
,007
To
tals
Ou
t o
f O
ffic
eE
ng
inee
rin
g L
abo
r
TR
V T
rave
l
#In
Off
ice
MA
T S
oftw
are
Sup
port
EA
20E
WA
063
ES
TIM
AT
E F
Y20
21 A
nnua
l Sup
port
1.0
.0.x
lsm
Sum
mar
y1
of 7
15-16
Clie
nt:
E
nci
na
Pro
ject
: F
Y20
21 A
nn
ual
Su
pp
ort
Num
ber:
EA
20E
WA
063
D
ate:
7/1
/202
0
Rev
isio
n: 1
.0.0
A
utho
r: M
M
Rev
iew
ed B
y: L
S
Pro
ject
En
g.
Le
ad
En
g.
PM
Arc
hite
ctP
roje
ct E
ng
.L
ea
d E
ng
.P
MA
rch
itect
65
0O
n c
all s
up
po
rt14
6$3
2,18
0ph
one
calls
, tec
hnic
al in
vest
igat
ions
, ons
ite s
uppo
rt60
2420
1616
10<
incl
udes
pro
ject
man
agem
ent a
s ne
eded
to h
andl
e su
ppor
t>an
nual
pla
nnin
g m
eetin
gsad
-hoc
mee
tings
Ho
urs
6024
200
1616
100
146
Pri
ce$1
2,30
0$5
,640
$4,8
00$0
$3,2
80$3
,760
$2,4
00$0
$32,
180
WB
SD
esc
riptio
nH
ou
rsP
rice
On
Cal
l Su
pp
ort
En
gin
eeri
ng
Lab
or
In O
ffic
eO
ut
of
Off
ice
To
tals
EA
20E
WA
063
ES
TIM
AT
E F
Y20
21 A
nnua
l Sup
port
1.0
.0.x
lsm
EN
G O
n C
all S
uppo
rt2
of 7
15-17
Clie
nt:
E
nci
na
Pro
ject
: F
Y20
21 A
nn
ual
Su
pp
ort
Num
ber:
EA
20E
WA
063
D
ate:
7/1
/202
0
Rev
isio
n: 1
.0.0
A
utho
r: M
M
Rev
iew
ed B
y: L
S
Pro
ject
En
g.
Le
ad
En
g.
PM
Arc
hite
ctP
roje
ct E
ng
.L
ea
d E
ng
.P
MA
rch
itect
23
0W
SU
S u
pd
ates
an
d p
latf
orm
mai
nte
nan
ce53
$10,
955
upda
tes
inst
alla
tion
24up
date
s re
port
to E
WA
IS8
plat
form
test
pla
tfor
m b
acku
ps10
test
pla
form
rem
edia
tion
and
firm
war
e up
date
s8
3
Pro
ject
man
agem
ent
8$1
,920
99
0co
ordi
natio
n, p
roje
ct m
anag
emen
t, ov
erhe
ad, m
eetin
gs8
Ho
urs
503
80
00
00
61
Pri
ce$1
0,25
0$7
05$1
,920
$0$0
$0$0
$0$1
2,87
5
WB
SD
esc
riptio
nH
ou
rsP
rice
WS
US
Up
dat
esE
ng
inee
rin
g L
abo
rIn
Off
ice
Ou
t o
f O
ffic
eT
ota
ls
EA
20E
WA
063
ES
TIM
AT
E F
Y20
21 A
nnua
l Sup
port
1.0
.0.x
lsm
EN
G W
SU
S U
pdat
es3
of 7
15-18
Clie
nt:
E
nci
na
Pro
ject
: F
Y20
21 A
nn
ual
Su
pp
ort
Num
ber:
EA
20E
WA
063
D
ate:
7/1
/202
0
Rev
isio
n: 1
.0.0
A
utho
r: M
M
Rev
iew
ed B
y: L
S
Pro
ject
En
g.
Le
ad
En
g.
PM
Arc
hite
ctP
roje
ct E
ng
.L
ea
d E
ng
.P
MA
rch
itect
En
gin
eeri
ng
60$1
3,02
08
70
prep
are
trai
ning
man
uals
3612
87
0au
thor
ity s
taff
trai
ning
12
Pro
ject
man
agem
ent
9$2
,160
99
0co
ordi
natio
n, p
roje
ct m
anag
emen
t, ov
erhe
ad, m
eetin
gs9
Ho
urs
3612
90
012
00
69
Pri
ce$7
,380
$2,8
20$2
,160
$0$0
$2,8
20$0
$0$1
5,18
0
WB
SD
esc
riptio
nH
ou
rsP
rice
SC
AD
A T
rain
ing
En
gin
eeri
ng
Lab
or
In O
ffic
eO
ut
of
Off
ice
To
tals
EA
20E
WA
063
ES
TIM
AT
E F
Y20
21 A
nnua
l Sup
port
1.0
.0.x
lsm
EN
G S
CA
DA
Tra
inin
g4
of 7
15-19
Clie
nt:
E
nci
na
Pro
ject
: F
Y20
21 A
nn
ual
Su
pp
ort
Num
ber:
EA
20E
WA
063
D
ate:
7/1
/202
0
Rev
isio
n: 1
.0.0
A
utho
r: M
M
Rev
iew
ed B
y: L
S
Pro
ject
En
g.
Le
ad
En
g.
PM
Arc
hite
ctP
roje
ct E
ng
.L
ea
d E
ng
.P
MA
rch
itect
60
0S
CA
DA
CR
man
agem
ent
and
mai
nte
nan
ce19
6$4
2,88
0C
R m
anag
emen
t56
40as
-nee
ded
budg
et f
or C
Rs
5050
stan
dard
s m
odifi
catio
nsex
ecut
ion,
man
agem
ent
Pro
ject
man
agem
ent
29$6
,960
99
0co
ordi
natio
n, p
roje
ct m
anag
emen
t, ov
erhe
ad, m
eetin
gs29
Ho
urs
106
9029
00
00
022
5
Pri
ce$2
1,73
0$2
1,15
0$6
,960
$0$0
$0$0
$0$4
9,84
0
WB
SD
esc
riptio
nH
ou
rsP
rice
CR
sE
ng
inee
rin
g L
abo
rIn
Off
ice
Ou
t o
f O
ffic
eT
ota
ls
EA
20E
WA
063
ES
TIM
AT
E F
Y20
21 A
nnua
l Sup
port
1.0
.0.x
lsm
EN
G C
Rs
5 of
7
15-20
Cli
ent:
En
cin
aP
roje
ct:
F
Y20
21 A
nn
ual
Su
pp
ort
Num
ber:
EA
20E
WA
063
D
ate:
7/1
/202
0
Rev
isio
n: 1
.0.0
A
utho
r: M
M
Rev
iew
ed B
y: L
S
So
ftw
are
Su
pp
ort
To
tals
No.
Des
crip
tion
Man
ufac
ture
rP
art N
o.Q
ty.
Uni
t Cos
tE
xt. C
ost
Mar
kup
Uni
t Sel
lE
xt. S
ell
Pric
e
So
ftw
are
Su
pp
ort
$49,
420
1.S
chne
ider
HD
CS
Sup
port
, Gol
d Le
vel,
8x5
phon
e, s
oftw
are
upgr
ades
(18
mos
) -
Exp
12/
31/2
021
B&
KH
DC
S S
uppo
rt1
$20,
944
$20,
944
8%$2
2,62
0$2
2,62
02.
Cus
tom
er F
IRS
T #
1258
67 -
Sta
ndar
d -
Ren
ewal
- H
isto
rian
- E
xp 1
2/23
/202
1W
WC
AC
F-S
TA
ND
RD
-R-H
ST
1$2
2,50
0$2
2,50
08%
$24,
300
$24,
300
3.T
opV
iew
Sup
port
Ren
ewal
- E
xp 1
2/31
/202
1W
WC
AT
V-S
UP
T-R
1$9
26$9
268%
$1,0
00$1
,000
4.C
itect
Any
whe
re -
Cus
tom
er F
IRS
T #
7630
9 -
Sta
ndar
d Le
vel -
Ren
ewal
, Exp
1/3
1/20
22W
WC
AC
F-C
IT-1
0-70
01R
1$1
,389
$1,3
898%
$1,5
00$1
,500
Pri
ce$4
5,75
9$4
9,42
0
Bill
of
Mat
eria
lsS
ale
Info
rmat
ion
EA
20E
WA
063
ES
TIM
AT
E F
Y20
21 A
nnua
l Sup
port
1.0
.0.x
lsm
MA
T S
oftw
are
Sup
port
6 of
7
15-21
Clie
nt:
E
nci
na
Pro
ject
: F
Y20
21 A
nn
ual
Su
pp
ort
Num
ber:
EA
20E
WA
063
Dat
e: 7
/1/2
020
Rev
isio
n: 1
.0.0
Aut
hor:
MM
Rev
iew
ed B
y: L
S
On
Cal
l Su
pp
ort
Tra
vel (
as n
eed
ed)
$385
mile
age
to s
ite 1
(e.
g. E
A to
hot
el)
roun
d tr
ip, 1
10.5
mi.,
$0.
58/m
i.6
$64
$385
Tra
inin
g$1
28m
ileag
e to
site
1 (
e.g.
EA
to h
otel
)ro
und
trip
, 110
.5 m
i., $
0.58
/mi.
2$6
4$1
28
Pri
ce$5
13
Tra
vel
Des
crip
tion
Rat
e D
etai
lsQ
ty.
Uni
t Cos
tE
xt. C
ost
Pric
e
EA
20E
WA
063
ES
TIM
AT
E F
Y20
21 A
nnua
l Sup
port
1.0
.0.x
lsm
TR
V T
rave
l7
of 7
15-22
Ref: Admin. 20‐14172
ENCINA WASTEWATER AUTHORITY
BOARD OF DIRECTORS
Item : 16
Date : July 22, 2020
To : Honorable Chair and Board of Directors
From : Michael Steinlicht, General Manager
Issue : RESOLUTION 2020‐04 APPROPRIATING FUNDS FOR FISCAL YEAR 2021 PENSION
POLICY, OPERATING AND CAPITAL PROGRAM BUDGETS AND ESTABLISHING
CONTROLS THEREON
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
1. Adopt Resolution No. 2020‐04 appropriating funds for Fiscal Year 2021 Pension Policy, Operating
and Capital Program Budgets and establishing controls thereon.
2. Discuss and take other action as appropriate.
BACKGROUND
On April 22, 2020, the Board of Directors approved the Fiscal Year 2021 Pension Policy, Operating and
Capital Program Budgets and forwarded said budgets to the Encina Joint Advisory Committee which
recommended that the Boards and Councils of the Encina Member Agencies approve the budgets. Each
of the Member Agencies has approved the budgets in conformance with Section 13.1.2 of the Revised
Basic Agreement (Attachment 3). Adoption of the proposed resolution (Attachment 2) will appropriate
and authorize expenditure of $4,096,100 in pension policy funds, $19,173,359 in operating funds and
$24,249,023 in capital funds for the fiscal year ending June 30, 2021 as estimated in the Fiscal Year 2021
budget document.
FIVE‐YEAR STRATEGIC BUSINESS PLAN REFERENCE
Tactical Goal No. 2020‐SI‐6‐5 requires EWA to prepare and complete the annual Appropriations
Resolution in completing the Fiscal Year 2021 Operating and Capital Budget process.
DISCUSSION
Resolution 2020‐04, as proposed, accomplishes the following:
1. Appropriates $4,096,100 in pension policy funds, $19,173,359 in operating funds and $24,249,023
in capital funds for the fiscal year ending June 30, 2021 as authorized by the Boards and Councils
of the Encina Member Agencies.
2. Estimates $4,096,100 in Member Agency pension funding policy revenue.
3. Estimates $18,211,359 in Member Agency operating revenue, $962,000 in other operating
revenue, and total operating revenue of $19,173,359.
16-1
July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors
Resolution Appropriating Funds for Fiscal Year 2021
Ref: Admin. 20‐14172
4. Estimates $24,249,023 Member Agency capital program revenue.
5. Authorizes expenditure of appropriated and budgeted funds subject to a $50,000 per transaction
limit and all other controls established in the proposed Resolution.
6. Limits full‐time equivalent positions to seventy‐one (71) and authorizes the General Manager to
hire temporary or part‐time staff within the aggregate Operating and Capital Program expense
budget. The Board of Directors can adjust staffing at its discretion.
7. Authorizes the General Manager to approve transfers of budgeted funds up to $50,000 and make
transfers for purpose of administratively consolidating accounts.
8. Authorizes the General Manager to approve change orders to contracts and agreements up to
$50,000 subject to an aggregate limit of $100,000 on any particular contract or agreement.
9. Authorizes the General Manager to execute contracts for continuing services provided the FY
2021 Operating or Capital Budget includes the underlying appropriation.
10. Authorizes, subject to Board of Directors approval, expenditures necessary to reconstruct the
Joint System in an emergency.
11. Carries forward budgeted and unexpended prior year Capital Improvements appropriations.
12. Carries forward budgeted and unexpended prior year Capital Program appropriations for the
following incomplete Planned Asset Replacement or Capital Acquisitions:
13. Identifies appropriate Capital Reserve amount established by the Financial Reserve Policy
Resolution.
14. Authorizes the General Manager to delegate authority given to him by the Appropriation
Resolution.
MEMBER AGENCY MANAGER REVIEW
The Member Agency Managers were briefed on this item in their July meeting and provided their support.
COMMITTEE REVIEW
The Policy & Finance Committee reviewed this item in their July meeting and approved staff’s
recommendation. Director Sullivan asked whether EWA’s purchasing and budget transfer threshold of
$50,000 needs to be revisited. General Manager Steinlicht stated staff examined this concern and found
only a few items in recent years that were slightly above this threshold. Staff aims to balance having the
Account Description Balance
32002‐7750‐70890 BVPS ‐ Spare Pump 65,000$
80002‐8050‐80860 EWPCF ‐ Primary Sedimentary Tank Parts 42,000
80002‐8020‐80780 EWPCF ‐ DAF Pressurization Pump Rebuild 8,500
115,500$
16-2
July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors
Resolution Appropriating Funds for Fiscal Year 2021
Ref: Admin. 20‐14172
appropriate level of control protocols with transparency and believes EWA should maintain the $50,000
threshold for an additional year.
Director Mosca asked whether EWA needs any additional internal controls in light of COVID‐19 causing
more work to be conducted remotely. Mr. Spence responded stating EWA’s internal controls have
consistently been ahead of the curve and EWA was prepared for work‐from‐home initiatives due to the
fact that EWA transitioned years ago to a paperless, digitized workflow to document, review, and approve
financial transactions. EWA’s independent auditors have tested these procedures in the past and have
praised the internal control environment. Staff invites further recommendations for improvement each
year though.
FISCAL IMPACT
The recommendation appropriates and authorizes the Fiscal Year 2021 Pension Funding Policy Budget
totaling $4,096,100, Operating Budget totaling $19,173,359 and Capital Program Budget of $24,249,023
in addition to certain unexpended Fiscal Year 2020 appropriations consistent with the approved Budget
document and the controls established by Resolution No. 2020‐04.
THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:
1. Adopt Resolution No. 2020‐04 appropriating funds for Fiscal Year 2021 Pension Policy, Operating
and Capital Program Budgets and establishing controls thereon.
2. Discuss and take other action as appropriate.
Attachment 1: Presentation Attachment 2: Proposed Resolution 2020‐04 Appropriating Funds for Fiscal Year 2021 Pension Policy, Operating
& Capital Program Budgets and Establishing Controls Thereon Attachment 3: Member Agency Budget Adoption Resolutions Prepared by: Joseph Spence, Assistant to the General Manager Reviewed by: LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor Reviewed by: Scott McClelland, Assistant General Manager Approved by: Michael Steinlicht, General Manager
16-3
Resolution 2020-04Appropriating Funds for Fiscal Year 2021 Pension Policy, Operating and Capital Program Budgets and Establishing Controls Thereon
BOARD OF DIRECTORS7/22/2020
16-5
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
1. Adopt Resolution No. 2020‐04 appropriating funds for Fiscal Year 2021Pension Policy, Operating and Capital Program Budgets and establishingcontrols thereon.
2. Discuss and take other action as appropriate.
Resolution 2020-04: Appropriating FY2021
16-6
Background
• Appropriations Resolution is final step of budgetimplementation process
• Establishes control parameters around the funds
• FY2021 Budget approved by Board of Directors andJoint Advisory Committee (April 22nd)
• Budget approved by each Member Agency (May-June)
Resolution 2020-04: Appropriating FY2021
16-7
Proposed Resolution 2020-04
1. Appropriates $4,096,100 in pension policy funds, $19,173,359 in operating funds and $24,249,023 in capital funds for the fiscal year ending June 30, 2021 as authorized by the Boards and Councils of the Encina Member Agencies.
2. Estimates $4,096,100 in Member Agency pension funding policy revenue.
3. Estimates $18,211,359 in Member Agency operating revenue, $962,000 in other operating revenue, and total operating revenue of $19,173,359.
Resolution 2020-04: Appropriating FY2021
16-8
Proposed Resolution 2020-04
4. Estimates $24,249,023 Member Agency capital program revenue.
5. Authorizes expenditure of appropriated and budgeted funds subject toa $50,000 per transaction limit and all other controls established in theproposed Resolution.
6. Limits full‐time equivalent positions to seventy‐one (71) and authorizesthe General Manager to hire temporary or part‐time staff within theaggregate Operating and Capital Program expense budget. The Boardof Directors can adjust staffing at its discretion.
Resolution 2020-04: Appropriating FY2021
16-9
Proposed Resolution 2020-04
7. Authorizes the General Manager to approve transfers of budgetedfunds up to $50,000 and make transfers for the purpose ofadministratively consolidating accounts.
8. Authorizes the General Manager to approve change orders to contractsand agreements up to $50,000 subject to an aggregate limit of$100,000 on any particular contract or agreement.
9. Authorizes the General Manager to execute contracts for continuingservices provided the FY 2021 Operating or Capital Budget includes theunderlying appropriation.
Resolution 2020-04: Appropriating FY2021
16-10
Proposed Resolution 2020-04
10. Authorizes, subject to Board of Directors approval, expendituresnecessary to reconstruct the Joint System in an emergency.
11. Carries forward budgeted and unexpended prior year CapitalImprovements appropriations.
Resolution 2020-04: Appropriating FY2021
16-11
Proposed Resolution 2020-04
12. Carries forward budgeted and unexpended prior year Capital Programappropriations for the following incomplete Planned AssetReplacement or Capital Acquisitions:
Resolution 2020-04: Appropriating FY2021
Account Description Balance
32002‐7750‐70890 BVPS ‐ Spare Pump 65,000$ 80002‐8050‐80860 EWPCF ‐ Primary Sedimentary Tank Parts 42,000
80002‐8020‐80780 EWPCF ‐ DAF Pressurization Pump Rebuild 8,500
115,500$
16-12
Proposed Resolution 2020-04
13. Identifies appropriate Capital Reserve amount established by theFinancial Reserve Policy Resolution.
14. Authorizes the General Manager to delegate authority given to him bythe Appropriation Resolution.
Resolution 2020-04: Appropriating FY2021
Financial Reserve Balance Operating Reserve 2,750,000$ Remote Facilities Reserve 250,000
Inventory Reserve 1,300,000
Capital Reserve 8,100,000
12,400,000$
16-13
THEREFORE, STAFF RECOMMENDS BOARD OF DIRECTORS:
1. Adopt Resolution No. 2020‐04 appropriating funds for Fiscal Year 2021Pension Policy, Operating and Capital Program Budgets and establishingcontrols thereon.
2. Discuss and take other action as appropriate.
Resolution 2020-04: Appropriating FY2021
16-14
ATTACHMENT 2
PROPOSED RESOLUTION 2020‐04 APPROPRIATING FUNDS FOR FISCAL YEAR 2021 PENSION POLICY, OPERATING & CAPITAL PROGRAM
BUDGETS AND ESTABLISHING CONTROLS THERON
July 22, 2020
16-15
RESOLUTION No. 2020‐04
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE ENCINA WASTEWATER AUTHORITY APPROPRIATING FUNDS FOR FISCAL YEAR 2021 PENSION POLICY, OPERATING AND CAPITAL
PROGRAM BUDGETS AND ESTABLISHING CONTROLS THEREON
Ref: Admin. 20‐14151b
WHEREAS, the Revised Basic Agreement and Revised Establishment Document governing the
administration of the Encina Wastewater Authority (Authority) require the preparation and approval of
Estimated Operating and Capital Program budgets on an annual basis; and,
WHEREAS, the Authority’s Fiscal Year 2021 Pension Policy, Operating and Capital Program
Budgets were approved by the Authority’s Board of Directors and the Encina Joint Advisory Committee
on April 22, 2020; and,
WHEREAS, the Authority has received certified copies of approving resolutions or minute orders
from the governing bodies of each of the Member Agencies confirming their approval of the Authority’s
Fiscal Year 2021 Pension Policy, Operating and Capital Program Budgets as required by the Revised Basic
Agreement.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Encina Wastewater Authority
as follows:
Section 1. Pension Policy funds totaling $4,096,100, Operations, Maintenance, and
Administration Program funds totaling $19,173,359 and Capital Program funds totaling $24,249,023 are
hereby appropriated for Fiscal Year 2021.
Section 2. Estimated Member Agency Pension Policy revenues of $4,096,100 are hereby
appropriated for Fiscal Year 2021.
Section 3. Estimated Member Agency Operating revenues of $18,211,359, Other Operating
revenues of $962,000, and total Operating revenues of $19,173,359 are hereby appropriated for Fiscal
Year 2021.
Section 4. Estimated Member Agency Capital Program revenues totaling $24,249,023 are
hereby appropriated for Fiscal Year 2021.
Section 5. Subject to a $50,000 single transaction limit and as modified by other applicable
controls established herein, the General Manager is hereby authorized to expend appropriated funds in
accordance with the Authority’s Fiscal Year 2021 Operating and Capital Program Budgets. 16-16
EWA Board of Directors Resolution No. 2020‐04 Fiscal Year 2021 Budget Appropriation and Controls Resolution
Ref: Admin. 20‐14151b
Section 6. Seventy‐one (71) full‐time equivalent positions are authorized for Fiscal Year 2021.
Only the Board of Directors may authorize any increase in the number of authorized positions. The
General Manager is hereby authorized to hire temporary or part‐time staff as necessary, within the
aggregate Operating and Capital Program expense budget appropriations.
Section 7. The General Manager is hereby authorized to transfer funds between accounts within
the Operating or Capital Program in an amount up to $50,000 per transfer. Any transfer of funds from
the Operating Program to the Capital Program, from the Capital Program to the Operating Program, or, in
excess of $50,000, must be approved by the Board of Directors. Any transfer of funds between identical
project codes for the purpose of consolidating accounts is hereby authorized and is not subject to the
transfer limit.
Section 8. Where sufficient budgeted funds are available, the General Manager is hereby
authorized to approve change orders on contracts and agreements provided, however, that no single
change order shall exceed $50,000 and that the aggregate value of change orders on any particular
contract or agreement shall not exceed $100,000. The Board of Directors must approve all change orders
exceeding these limits.
Section 9. The General Manager is authorized to execute contracts and agreements for
appropriated programs between the Authority and: [a] the California Sanitation Risk Management
Authority for insurance; [b] each and every contractor necessary to ensure continuous execution of all
existing and subsequently effective employee retirement, health, and other employee welfare benefits as
specified in Board of Directors approved labor agreement resolutions; [c] the California Public Employees’
Retiree Benefit Trust for continuous execution of the Irrevocable Trust as specified in Board of Directors
approved resolutions; [d] Universal Protection Service L.P. or subsequently effective provider of onsite
security patrol services; [e] ADS Environmental Services for flow metering services; [f] Prominent Systems
Inc. for carbon replacement within the Odor Reduction Facilities; [g] Procopio, Cory, Hargreaves, and
Savitch for legal services; [h] Woodard & Curran for as needed engineering services; [i] Hawthorne Power
Systems for engine overhaul maintenance services; [j] Parada Painting Inc. for as needed coating services;
[k] Tyler Technologies for accounting support services; [l] Accounting Principles or subsequently effective
provider of temporary staffing services; and, [m] White Nelson Diehl Evans LLP for professional financial
management staff services.
16-17
EWA Board of Directors Resolution No. 2020‐04 Fiscal Year 2021 Budget Appropriation and Controls Resolution
Ref: Admin. 20‐14151b
Section 10. In an emergency, the General Manager is hereby authorized to expend those funds
necessary to reconstruct, or cause to be reconstructed, any portion of the Joint system when
reconstruction is immediately required to permit the Joint System to continue to function. Any such
expenditure must be approved by the Board of Directors.
Section 11. All funds budgeted for Capital Improvements remaining unexpended at June 30, 2020
are hereby appropriated and budgeted for Fiscal Year 2021.
Section 12. Funds budgeted and unexpended in Fiscal Year 2020 for the following Planned Asset
Replacement or Capital Acquisition project are hereby appropriated and budgeted in Fiscal Year 2021:
Section 13. The Financial Reserve amounts for Fiscal Year 2021 are established as follows:
Section 14. The General Manager may delegate any authority granted pursuant to this resolution.
Account Description Balance
32002‐7750‐70890 BVPS ‐ Spare Pump 65,000$ 80002‐8050‐80860 EWPCF ‐ Primary Sedimentary Tank Parts 42,000
80002‐8020‐80780 EWPCF ‐ DAF Pressurization Pump Rebuild 8,500
115,500$
Financial Reserve Balance Operating Reserve 2,750,000$ Remote Facilities Reserve 250,000
Inventory Reserve 1,300,000
Capital Reserve 8,100,000
12,400,000$
16-18
EWA Board of Directors Resolution No. 2020‐04 Fiscal Year 2021 Budget Appropriation and Controls Resolution
Ref: Admin. 20‐14151b
PASSED AND ADOPTED at a meeting of the Board of Directors of the Encina Wastewater Authority
held July 22, 2020, by the following vote:
Representative Agency Vote Chair Juliussen Leucadia Wastewater District
Vice Chair Blackburn City of Carlsbad Director Schumacher City of Carlsbad Director Rigby City of Vista Director Ritter City of Vista Director Rigby Buena Sanitation District Director Ritter Buena Sanitation District Director Blakespear City of Encinitas Director Mosca City of Encinitas Director Sullivan Leucadia Wastewater District Director Martin Vallecitos Water District Director Hernandez Vallecitos Water District
ATTEST:
Chair Allan Juliussen Michael Steinlicht Board of Directors Board Secretary Encina Wastewater Authority Encina Wastewater Authority
16-19
EXHIBIT 10
RESOLUTION NO. 2020-131
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, APPROVING THE CITY OF CARLSBAD'S SHARE OF THE
FISCAL YEAR 2020-21 OPERATING AND CAPITAL BUDGETS OF THE
ENCINA WASTEWATER AUTHORITY
WHEREAS, the City of Carlsbad is a Member Agency to the Encina Joint Powers
Agreement (the Encina Agreement) entered into on July 13, 1961, for the acquisition, construction,
ownership, operation and maintenance of the Encina Joint Sewer System; and
WHEREAS, the Encina Agreement requires approval for the budget of the Encina
Wastewater Authority (EWA) by the Member Agencies following the recommendation of the Joint
Advisory Committee (JAC); and
WHEREAS, the City Council of the City of Carlsbad desires to approve said budget and
provide for the payment of its share of such expenses in accordance with the allocation provided in
the Encina Agreement; and
WHEREAS, the Wastewater Fund is projected to have sufficient funds for the payments
as they become due.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
1. That the above recitations are true and correct.
2. That the City of Carlsbad's estimated share of the FY 2020-21 Operating Budget
of the EWA as approved by the JAC on April 22, 2020, in the amount of $4,145,972 for Wastewater
Plant Operations, $953,505 for Wastewater Plant Operations pension pay-down (year two of three),
$1,392,864 for the Carlsbad Water Recycling Facility Operations, and $256,601 for Carlsbad Water
Recycling Facility Operations pension pay-down (year two of three) is approved.
3. That the City of Carlsbad's estimated share of the FY 2020-21 Capital Budget of
June 23, 2020 Item #9 Page 117 of 124 16-21
Ref: Admin.20‐14168
ENCINA WASTEWATER AUTHORITY
BOARD OF DIRECTORS
Item : 17
Date : July 22, 2020
To : Honorable Chair and Board Members
From : Michael Steinlicht, General Manager
Issue : PRIMARY AREA IMPROVEMENTS PROJECT CHANGE ORDER
STAFF RECOMMENDS THE BOARD OF DIRECTORS:
1. Authorize the General Manager to approve a Change Order to the construction contract between
the Encina Wastewater Authority with Gateway Pacific Contractors, Inc. in the amount of
$424,532.
2. Discuss and take other action as appropriate.
BACKGROUND
On February 27, 2019, the Board of Directors awarded a contract to Gateway Pacific Contractors, Inc.
(Gateway) for the construction of the Primary Area Improvements Project (PAIP). This project includes
upgrades and rehabilitation of the existing grit and screenings facilities and process equipment located in
the primary treatment area of the Encina Water Pollution Control Facility (EWPCF). The total cost of the
proposed Change Order exceeds the General Manager’s authority and therefore requires Board of
Directors approval.
FIVE‐YEAR STRATEGIC BUSINESS PLAN REFERENCE
Strategic Initiative SI‐4‐9: Complete the Primary Area Improvements Projects Phase One of Three
Equipment Installations.
DISCUSSION
On February 27, 2019, the Board of Directors awarded a contract to Gateway for the construction of the
PAIP. The majority of the existing grit and screenings facilities were constructed and placed into service
as part of the 1982 Phase III Expansion Project. Additional facilities to include Grit Tank No.3,
Sedimentation Tanks No.7 through No.10 and associated channels were subsequently constructed and
placed in service as part of the 1992 Phase IV Expansion Project. The PAIP is a critical plant upgrade and
improvements construction project that rehabilitates the aging channels and structures, upgrades
preliminary treatment equipment, and replaces deteriorating electrical and control systems in the primary
area. The Project is comprised of the following elements:
Replacement of screening and grit handling equipment, including construction of a new Grit and
Screenings Annex.
17-1
July 22, 2020
Encina Wastewater Authority (EWA) Board of Directors Primary Area Improvements Project Change Order
Ref: Admin.20‐14168
Repair, rehabilitation, and replacement of aging infrastructure including concrete repair and
coatings of tanks and channels.
Earthwork, grading, paving, yard piping, and construction of a new soil‐nailed retaining wall.
Replacement of isolation gates throughout the primary area.
Replacement of Motor Control Centers (MCC’s), replacement of conduit and wiring, and upgrades
to the primary area instrumentation and control systems including integration into the plant‐wide
Gateway is currently mobilized on‐site executing this scope of work with the project nearing 50%
completion. The Change Orders to date includes costs related to several changes in the project
construction scope resulting from design modifications made due to field conditions identified during
construction. These items include; alternate conduit and piping system routing due to conflicts with
existing below grade utilities, installation of waterproofing over the masonry block finish on the
Screenings Annex walls in lieu of the stucco finish as originally designed, increased height of the soil nail
wall, additional effort associated with duct bank routing based on existing below grade utilities and
installation of a temporary potable water bypass while the soil nail wall was under construction. These
and several other additional design enhancements included in the proposed Change Order ensure the
operational success of the facilities being installed. The contractor is currently working on the scope
elements that must be completed during the dry weather season. These include the replacement of
isolation gates and rehabilitation of the concrete channels and tanks.
Based on the age of the criticality of the facilities and the nature of the remaining scope elements the
proposed Change Order also includes an allowance in the amount of $250,000 to be utilized for
unforeseen conditions as they arise during construction. This allowance will provide the General Manager
the flexibility to authorize additional scope based on field conditions and minimize costly delays by
allowing construction to continue without interruption. This scope expansion would be reflected as
Change Order No. 4. Details of the PAIP financial performance are presented in the table below:
Primary Area Improvements Project Fiscal Performance
Amount Approval Authority Comments
Original Contract
Award $11,225,520 Board of Directors
Change Order No.1 $32,771
General Manager
Changes in contractor scope to
accommodate actual field conditions &
design clarifications/enhancements
Change Order No.2 $44,229 General Manager Change Annex from stucco finish to
decorative masonry block finish
Change Order No.3 $22,093 General Manager
Changes in contractor scope to
accommodate actual field conditions &
design clarifications/enhancements
17-2
July 22, 2020
Encina Wastewater Authority (EWA) Board of Directors Primary Area Improvements Project Change Order
Ref: Admin.20‐14168
Proposed Change
Order No.4 $424,532
Board of Directors
(pending)
Changes in contractor scope to
accommodate actual field conditions &
design clarifications/enhancements
Contract Value $11,749,145 Sufficient appropriations exist in Capital
Budget
* Total Change Orders to date including proposed Change Order No.4 are approx. 4.66% of the original $11.2 million
contract value.
FISCAL IMPACT
The fiscal impact of the proposed Change Order is $424,532 Sufficient appropriations are available in the
FY 2021 Capital Budget to support this action.
MEMBER AGENCY MANAGERS REVIEW
Member Agency Managers were briefed on this item in their July meeting and provided their support.
COMMITTEE REVIEW
The Capital Improvement Committee reviewed this item in their July meeting and approved staff’s
recommendation.
THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:
1. Authorize the General Manager to approve a Change Order to the construction contract between
the Encina Wastewater Authority with Gateway Pacific Contractors, Inc. in the amount of
$424,532.
2. Discuss and take other action as appropriate.
Attachment 1: Presentation Attachment 2: Primary Area Improvements Project Change Order No.4 Prepared by: James Kearns, Capital Projects Manger
Reviewed by: Scott McClelland, Assistant General Manager
Approved by: Michael Steinlicht, General Manager
17-3
Primary Area Improvements Project Change Order
B O A R D O F D I R EC T O R S 7 / 2 2 / 2 0 2 0
17-5
Recommendation
• Authorize the General Manager to approve a Change Order to the construction contract between the Encina Wastewater Authority and Gateway Pacific Contractors, Inc. in the amount of $424,532
• Discuss and take other action as appropriate
17-6
FIVE-YEAR STRATEGIC BUSINESS PLAN REFERENCE
Strategic Initiative No.4: “Improve Infrastructure Performance and Reliability ”
SI-4-9 Complete the Primary Area Improvements Projects Phase One of Three Equipment Installations
17-7
Primary Area Improvements Project (PAIP) - Background
Old Screenings Building
Screenings Building Equipment
• BOD Award Gateway Pacific Feb 2019
• Original Contract Value $11,225,520• Contract Duration – 730 Calendar
Days • 1982 Phase III Facilities (40 years old)
17-8
Project Scope
• Barscreen replacement • Channel concrete repair & coatings• Grit Tank & Sedimentation Tank concrete
repair & coatings • Screenings conveyance & handling
equipment replacement • Construction of a new Grit & Screening
Annex • Grit & Sedimentation Tank Isolation gate
replacements• MCC Replacement• Building HVAC Improvements • SCADA Upgrades
Sed Tank Influent Channel
New Conduit Routing
17-9
Construction in Progress
Sed Tank Influent Channel
New Isolation Gates
New Retaining Wall
New Screenings Annex
17-10
Primary Area Improvements Project Fiscal Performance
Amount Approval Authority Comments
Original Contract Award
$11,225,520 Board of Directors
Change Order No.1 $32,771General Manager
Changes in contractor scope to accommodate actual field conditions & design clarifications/enhancements
Change Order No.2 $44,229 General ManagerChange Annex from stucco finish to decorative masonry block finish
Change Order No.3 $22,093 General ManagerChanges in contractor scope to accommodate actual field conditions & design clarifications/enhancements
Proposed Change Order No.4
$424,532Board of Directors(pending)
Changes in contractor scope to accommodate actual field conditions & design clarifications/enhancements
Contract Value $11,749,145 Sufficient appropriations exist in Capital Budget
Total Change Orders to date including proposed Change Order No.4 are approx. 4.66% of theoriginal $11.2 million contract value
17-11
Fiscal Impact
• The fiscal impact of the proposed Change Order is $424,532 Sufficient appropriations are available in the FY 2021 Capital Budget to support this action
17-12
Recommendation
• Authorize the General Manager to approve a Change Order to the construction contract between the Encina Wastewater Authority and Gateway Pacific Contractors, Inc. in the amount of $424,532
• Discuss and take other action as appropriate
17-13
DATE OF CONTRACT: April 15, 2019PROJECT TITLE: Primary Area Improvements Project
TO CONTRACTOR: Gateway Pacific Contractors Inc.8055 Freeport Blvd.Sacramento, CA 95832
Item 1 is an ADD / DEDUCT / NO CHANGE in the amount of 12,653.83$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 2
Item 2 is an ADD / DEDUCT / NO CHANGE in the amount of 3,436.58$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 3
Item 3 is an ADD / DEDUCT / NO CHANGE in the amount of 7,821.42$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 4
Item 4 is an ADD / DEDUCT / NO CHANGE in the amount of 4,722.89$ and requires 0 calendar days ADDED / DEDUCTED
CHANGE ORDER FORM
DESCRIPTION: PCO #6 / RFI #32 – Wash Water Manifold Drains. Add piping for 3-inch drains from Huber Screening Wash Press Units. Drains were not shown on Bid Drawings and need to be connected to in slab under slab drain piping in the Grit and Screenings Annex Building.
DESCRIPTION: PCO #7 / Field Order #3 – Revised Door Lintel Steel Beam Detail. Change door lintel to concrete beam at Grit and Screenings Annex Building, Door DA-100A. Original door lintel was a steel beam that would have been exposed to view.
DESCRIPTION: PCO #10B / Field Order #7 – Delete Dumpster Lidding and Grit Screw Conveyor Modifications. Dumpster lidding system was deleted from scope due to potential operational challenges. Modifications to the Grit Screw Conveyor are required for leveling in the grit bin. Cost proposal included credit for the deleted equipment and additional cost for design changes.
DESCRIPTION: PCO #4 / RFI #29 – Temporary Water Bypass. Install temporary water line for 6-inch potable water line during construction of Soil Nail Wall. Existing pipeline alignment conflicted with Soil Nail Wall.
CHANGE ORDER NO. 4DATE: July 8, 2020
Ref: Admin.20-1416
When this change order has been approved by Encina Wastewater Authority, you are directed to make the following
changes under the Contract, subject to all Contract provisions.
ITEM 1
Page 1 of 517-16
ITEM 5
Item 5 is an ADD / DEDUCT / NO CHANGE in the amount of 17,065.81$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 6
Item 6 is an ADD / DEDUCT / NO CHANGE in the amount of 2,000.00$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 7
Item 7 is an ADD / DEDUCT / NO CHANGE in the amount of 10,113.00$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 8
Item 8 is an ADD / DEDUCT / NO CHANGE in the amount of 14,690.65$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 9
Item 9 is an ADD / DEDUCT / NO CHANGE in the amount of 9,014.25$ and requires 0 calendar days ADDED / DEDUCTED
DESCRIPTION: PCO #20A / Field Order #5 – FRP Ducting in Screening Building. Modify FRP ducting by adding offsets. Changes made to provide maximum clearance on the South side of the Existing Screenings Building between the new Mezzanine level steel framing and FRP foul air ducts.
DESCRIPTION: PCO #13 – Change All Handrail to Aluminum. Change handrail from galvanized steel to an aluminum three-rail system to match existing. Also, change Mezzanine handrail to removable and add cable guard railing to Soil Nail Wall.
DESCRIPTION: PCO #17 / Field Order #6 – Annex Building Under lab Pipe Encasement. Add concrete encasement for under slab drain piping at the Grit and Screenings Annex Building. Bid Addendum was unclear about encasement. Additional work was performed and tracked on time and materials.
DESCRIPTION: PCO #16 / RFI #24 – Counterfort Wall Widening. Grit and Screenings Building Annex Building foundation concrete walls needed widening to account for rebar clearance. Additional cost is for rebar subcontractor work without General Contractor markup.
DESCRIPTION: PCO #15 / RFI #25 – Modify Trench Drain in Annex Building. Change the trench drain to have stainless steel grating in lieu of fiberglass reinforced plastic. Bid addendum was not clear on trench drain construction.
Page 2 of 517-17
ITEM 10
Item 10 is an ADD / DEDUCT / NO CHANGE in the amount of 2,502.14$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 11
Item 11 is an ADD / DEDUCT / NO CHANGE in the amount of 5,289.47$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 12
Item 12 is an ADD / DEDUCT / NO CHANGE in the amount of 35,357.99$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 13
Item 13 is an ADD / DEDUCT / NO CHANGE in the amount of 11,939.42$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 14
Item 14 is an ADD / DEDUCT / NO CHANGE in the amount of 2,332.14$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 15
DESCRIPTION: PCO #26 – Electrical MH/HH Conduit Routing. Additional work on time and materials due to unforeseen conditions. Unforeseen existing underground duct banks required tunneling and air-lancing for the new duct banks near Electrical manhole and handholes MH-18 and HH-18.
DESCRIPTION: PCO #28 – Additional Rebar at Annex SOG. Additional work on time and materials for reinforcing steel added in the Grit and Screenings Annex Building slab on graded as directed by the Engineer and Inspector. Added reinforcing steel were provided as clarification to the Contract Drawing Details.
DESCRIPTION: PCO #30 / RFI #51 HDPE Pipe Cost. Changes to the HDPE grit piping routing and added insulation. Cost proposal includes credit for original pipe supports, additions for the new supports and insulation wrapping for the exposed HDPE pipe.
DESCRIPTION: PCO #31 / RFI #80 – Extend Soil Nail Wall. The Soil Nail Wall field dimensions were greater in height and width due to existing slope conditions differing from the Contract Drawings.
DESCRIPTION: PCO #34 / RFI #85 – Annex Building Structural Beam Bearing Plates and Masonry Rebar Interferences. Unforeseen conflict between the mezzanine and roof deck structural steel bearing plates and the masonry reinforcing. Steel bearing plates were field modified on time and materials to mitigate the conflict.
DESCRIPTION: PCO #40 / RFI #90 – Supply NEMA 6/7 Operator for Overhead Door. Changed the rating of the overhead door operators at the Grit and Screenings Annex Building due to classified area. Specifications for the door operator where not appropriate for the environment of Screenings Building.
Page 3 of 517-18
Item 15 is an ADD / DEDUCT / NO CHANGE in the amount of 11,234.86$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 16
Item 16 is an ADD / DEDUCT / NO CHANGE in the amount of 5,040.91$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 17
Item 17 is an ADD / DEDUCT / NO CHANGE in the amount of 5,000.00$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 18
Item 18 is an ADD / DEDUCT / NO CHANGE in the amount of 14,316.75$ and requires 0 calendar days ADDED / DEDUCTED
ITEM 19
Item 19 is an ADD / DEDUCT / NO CHANGE in the amount of 250,000.00$ and requires 0 calendar days ADDED / DEDUCTED
DESCRIPTION: PCO #46 – Annex Building Trolley Hoist. Proposal by Gateway Pacific to add a trolley hoist beam in the Grit and Screenings Annex Building. Cost for added beam is split between Gateway Pacific and EWA since Gateway Pacific will use the hoist during construction.
DESCRIPTION: PCO #53 – Waterproof Exterior Walls of Annex Building. Added a waterproof coated to the exterior of the Grit and Screening Annex Building. The recommendation to add waterproof coating was suggested by the masonry subcontractor due to the porous finish of the CMU. This recommendation was confirmed by CDM Smith and approved material was provided.
DESCRIPTION: Unforeseen Conditions Allowance - For this Item, payment will be by Force Account or Extra Work Procedures identified in GC-4 of the General Conditions, not to exceed the stipulated dollar amount shown
DESCRIPTION: PCO #44 / RFI #94 – Revise Checkered Plate Handles. Change checkered plate handle detail to match handles provided on previous Primary Effluent Conveyance Project as requested by EWA Operations.
Page 4 of 517-19
CONTRACT SUMMARY1. Original Contract sum 11,225,520.00$ 2. Net Change through previous Change Orders 99,093.31$ 3. Contract sum prior to this Change Order 11,324,613.31$ 4. Contract sum increased / decreased / unchanged by this Change Order 424,532.11$ 5. New Contract sum, including this Change Order 11,749,145.42$ 6. Contract time increased / decreased / unchanged by this Change Order 0 Calendar Days7. New date of completion of contract as of this Change Order June 4, 2021
Approvals:
1. Contractor By________________________________ Date:_____________________
2. Construction Manager By________________________________ Date:_____________________
3. EWA By________________________________ Date:_____________________
The above adjustments in time and cost include all compensation and adjustments for changes in sequence of work, equipment delivery, rescheduling, impact, and costs for extended overhead.
Page 5 of 517-20