NOTICE OF REGULAR MEETING - Encina Wastewater Authority

175
NOTICE OF REGULAR MEETING ENCINA WASTEWATER AUTHORITY BOARD OF DIRECTORS WEDNESDAY, JULY 22, 2020 8:00 A.M. Teleconference Meeting Ref: Admin. 2014169 The next regular meeting of the Encina Wastewater Authority Board of Directors is scheduled for 8:00 A.M. on Wednesday, July 22, 2020. Requests for disabilityrelated accommodations to assist or enable any person with a disability to participate in this meeting, or requests for agenda materials relating to this meeting, should be directed to Michael Steinlicht, General Manager. ______________________________________ Michael Steinlicht General Manager (760) 4383941 Scheduled Upcoming Meetings All meetings will be held telephonically unless otherwise noted. POLICY & FINANCE COMMITTEE – Tuesday, August 11, 2020 at 10:00 A.M. CAPITAL IMPROVEMENT COMMITTEE – Wednesday, August 19, 2020 at 7:30 A.M. REGULAR EWA BOARD OF DIRECTORS – Wednesday, August 26, 2020 at 8:00 A.M.

Transcript of NOTICE OF REGULAR MEETING - Encina Wastewater Authority

N O T I C E  O F  R E G U L A R  M E E T I N G  

E N C I N A   W A S T E W A T E R   A U T H O R I T Y      

B O A R D   O F   D I R E C T O R S  

 

WEDNESDAY, JULY 22, 2020 

8:00 A.M. 

 

Teleconference Meeting 

                    Ref: Admin. 20‐14169 

The next regular meeting of the Encina Wastewater Authority Board of Directors is scheduled for 8:00 

A.M. on Wednesday,  July 22, 2020.   Requests  for disability‐related  accommodations  to  assist or 

enable any person with a disability to participate in this meeting, or requests for agenda materials 

relating to this meeting, should be directed to Michael Steinlicht, General Manager.  

 

 

______________________________________ 

Michael Steinlicht 

General Manager 

(760) 438‐3941 

Scheduled Upcoming Meetings 

All meetings will be held telephonically unless otherwise noted. 

POLICY & FINANCE COMMITTEE – Tuesday, August 11, 2020 at 10:00 A.M. 

CAPITAL IMPROVEMENT COMMITTEE – Wednesday, August 19, 2020 at 7:30 A.M. 

REGULAR EWA BOARD OF DIRECTORS – Wednesday, August 26, 2020 at 8:00 A.M. 

 

 

Ref: Admin.20-14170

A G E N D A

E N C I N A W A S T E W A T E R A U T H O R I T Y

B O A R D O F D I R E C T O R S

DATE: July 22, 2020 MEETING TIME: 8:00 A.M. Deadline to Request for Public Comment: 7:30 A.M. Public Dial-In Number: (888) 788-0099 Conference ID: 991 6114 6078

The Encina Wastewater Authority Mission Statement: “As an environmental leader, EWA provides reliable and fiscally responsible wastewater services to the

communities we serve while optimizing the use of renewable resources.”

A G E N D A

Telephonic Participation by the Public. In light of the COVID-19 Pandemic and under the direction of Governor Newsom’s Executive Order N-29-20, all EWA Board and Committee public meetings shall only be accessible to members of the public telephonically. All members of the public wishing to observe the public meeting must dial in to the telephone number indicated above, and when prompted, use the Conference ID identified above. Please note all members of the public shall be muted by the EWA telephone conference coordinator (the “Coordinator”) in order to minimize disruption and background noise. Members of the public that wish to do so may address the Board of Directors via the telephone conference for up to 3 minutes on any item; anyone wishing to address the Board of Directors must submit an email to [email protected] with the subject line “Request to Address Board of Directors” by no later than 7:30 A.M. the day of the meeting. In the email, please include your name, the item you wish to speak about, and the telephone number that you will be calling from so that the Coordinator can un-mute your line when you are called upon to speak. Alternatively, you can call Joseph Spence at (760) 268-8820 by no later than 7:30 A.M. and request an opportunity to address the Board of Directors during public comment. Those making public comment requests via phone will be asked to provide your name, the item you wish to speak about, and the telephone number that you will be calling from so that the Coordinator can un-mute your line when you are called upon to speak. Once the public meeting has commenced, the Chair will invite you to speak and ask the Coordinator to un-mute your line at the appropriate time.

Persons with disabilities that require modifications or accommodations should email [email protected] or call (760) 268-8820 by no later than 7:30 A.M. to request reasonable modifications or accommodations consistent with the Americans with Disabilities Act and EWA shall promptly work with you to resolve the matter in favor of accessibility.

In the case of an emergency, items may be added to the agenda by a majority vote of the Board of Directors. An emergency is defined as a work stoppage; a crippling disaster; or other activity, which severely imperils public health, safety, or both. Also, items that arise after the posting of the agenda may be added by a two-thirds vote of the Board of Directors.

Encina Wastewater Authority Board of Directors

July 22, 2020

ii Ref: Admin.20-14170

1. Call to Order

2. Director Mosca will lead the Pledge of Allegiance

3. General Public Comment Period

4. Approval of Agenda

5. Presentation and Awards

• Mr. Gabriel Mendez for selection as EWA’s Employee of the Quarter for the 2nd quarter of the 2020 calendar year.

~~~ C O N S E N T C A L E N D A R ~~~

Items 6-15 will be enacted in one motion in accordance with the recommendation unless removed from the Consent Calendar by the Board of Directors, Staff or Public. If a member of the public wishes to remove an item, they should submit a “Request to Address JAC/EWA Board of Directors” form to the Board Secretary prior to the meeting. Items removed from the Consent Calendar will be considered in the original agenda order immediately following adoption of the Consent Calendar.

6. Minutes of June 24, 2020 Attachment Page 6

The minutes are the permanent record of the Encina Wastewater Authority Board of Directors meeting held on June 24, 2020.

Recommendation:

Approve the June 24, 2020 EWA Board of Directors Meeting Minutes.

Staff Reference: Michael Steinlicht, General Manager

7. Operations Report for June 2020 Attachment Page 7

This report summarizes EWA’s permit status, public relations activities, and safety record for June 2020.

Recommendation:

Receive and file the EWA Operations Report for June 2020.

Staff Reference: Octavio Navarrete, Director of Operations

8. EWA Monthly Flow and Capacity Management Report for June 2020 Attachment Page 8

This report summarizes member agency wastewater flows during June 2020.

Recommendation:

Receive and File the EWA Monthly Flow and Capacity Management Report for June 2020.

Staff Reference: Doug Campbell, Director of Environmental Compliance

Encina Wastewater Authority Board of Directors

July 22, 2020

iii Ref: Admin.20-14170

9. Approval of Demands for June 2020 Attachment Page 9

This item provides for Board of Directors approval of all demands paid from EWA’s Treasury during the month of June 2020.

Recommendation:

Approve checks and electronic payments for June 2020.

Staff Reference: LeeAnn Warchol, Treasurer/Auditor

10. Treasurer’s Cash and Investment Report for June 2020 Attachment Page 10

This report discloses EWA’s cash and investments as of the prior month’s end.

Recommendation:

Receive and file the Treasurer’s Cash and Investment Report for June 2020.

Staff Reference: LeeAnn Warchol, Treasurer/Auditor

11. Fiscal Year-to-Date Operating Budget Performance Report for June 2020

No Attachment

This report is deferred to the August 2020 Board of Directors meeting.

Recommendation: None

Staff Reference: LeeAnn Warchol, Treasurer/Auditor

12. June 2020 Tactical Plan Status Report Attachment Page 12

The 2020 Tactical Plan describes specific activities staff will undertake during the calendar year in support of the EWA Board of Directors approved 2018-2023 Five Year Strategic Business Plan. The Tactical Plan consists of forty-five (45) tactical goals distributed through eight (8) Strategic Initiatives and serves as the performance evaluation basis for the General Manager and staff. This report summarizes staff’s progress toward completing the program objectives specified in the 2020 Tactical Plan.

Recommendation:

Receive and file the June 2020 Tactical Plan Status Report.

Staff Reference: Michael Steinlicht, General Manager

Encina Wastewater Authority Board of Directors

July 22, 2020

iv Ref: Admin.20-14170

13. Auditors’ Communication with Those Charged with Governance Attachment Page 13

Section 13.1.9 of the Revised Basic Agreement requires the preparation of an annual independent audit of EWA’s financial statements. Section 2.9.2 of the Revised Establishment Document requires EWA’s annual independent audit to conform to requirements established for special districts by the State Controller and generally accepted accounting principles (GAAP). Statements on Auditing Standards (SAS) are promulgated by the Auditing Standards Board of the American Institute of Certified Public Accountants and provide guidance to independent auditors on GAAP. SAS No. 114 establishes standards for the Independent Auditors’ Communication with Those Charged with Governance in relation to an audit of financial statements. The Board of Directors is charged with governance in relation to EWA’s annual independent audit.

Recommendation:

Receive and file the Independent Auditors’ Communication in relation to the annual audit of EWA’s financial statements.

Staff Reference: Michael Steinlicht, General Manager

14. FY 2022 E-CAMP Update Award Attachment Page 14

Established in 1993, the Encina Comprehensive Asset Management Plan (E-CAMP) is a planning tool that is updated every two years to cost effectively manage assets over their full life cycle by planning and prioritizing asset rehabilitation and replacement for the Encina Water Pollution Control Facility (EWPCF). A new E-CAMP update is needed to prepare for the FY 2022 budgeting effort. On March 22, 2017, the Board of Directors authorized the General Manager to execute a professional services agreement with Kennedy/Jenks Consultants (K/J) for the FY 2018 E-CAMP Update, with the option to extend those services for additional years for additional E-CAMP efforts. Based on K/J’s ability to effectively complete the effort, staff recommends K/J continue to be utilized for the FY 2022 E-CAMP. This authorization exceeds the General Manager’s authority and therefore requires Board approval.

Recommendation:

Authorize the General Manager to execute a Professional Services Agreement with Kennedy/Jenks Consultants (K/J) in the amount not to exceed $149,985 for Engineering Services for the FY 2022 E-CAMP Update.

Staff Reference: Michael Steinlicht, General Manager

Encina Wastewater Authority Board of Directors

July 22, 2020

v Ref: Admin.20-14170

15. FY 2021 Annual SCADA Support Services Attachment Page 15

Encina Wastewater Authority’s (EWA) Supervisory Control and Data Acquisition (SCADA) System is a critical asset that monitors, controls, and collects critical data necessary for the operation of the wastewater treatment process. Like any other critical asset and piece of technology, SCADA requires routine maintenance and minor upgrades to sustain system performance. In October 2017, the Board awarded an As-Needed Professional Services Agreement to Enterprise Automation (EA) for programmatic SCADA systems integration and support. Under this effort, EA will provide SCADA integration and support services for that routine maintenance and upkeep. The recommendation exceeds the General Manger’s authority and therefore requires Board of Directors’ approval.

Recommendation:

Authorize the General Manager to award a Task Order to Enterprise Automation (EA) in the amount of $160,007 for FY 2021 Annual SCADA Support Services.

Staff Reference: Michael Steinlicht, General Manager

~~~END OF CONSENT CALENDAR~~~

~~~BOARD OF DIRECTORS ACTION ITEMS ~~~

16. Resolution 2020-04 Appropriating Funds for Fiscal Year 2021 Pension Policy, Operating and Capital Program Budgets and Establishing Controls Thereon

Attachment Page 16

On April 22, 2020, the Board of Directors approved the Fiscal Year 2021 Pension Policy, Operating and Capital Program Budgets and forwarded said budgets to the Encina Joint Advisory Committee which recommended that the Boards and Councils of the Encina Member Agencies approve the budgets. Each of the Member Agencies has approved the budgets in conformance with Section 13.1.2 of the Revised Basic Agreement (Attachment 3). Adoption of the proposed resolution (Attachment 2) will appropriate and authorize expenditure of $4,096,100 in pension policy funds, $19,173,359 in operating funds and $24,249,023 in capital funds for the fiscal year ending June 30, 2021 as estimated in the Fiscal Year 2021 budget document.

Recommendation:

1. Adopt Resolution No. 2020-04 appropriating funds for Fiscal Year 2021 Pension Policy, Operating and Capital Program Budgets and establishing controls thereon.

2. Discuss and take other action as appropriate.

Staff Reference: Michael Steinlicht, General Manager

Encina Wastewater Authority Board of Directors

July 22, 2020

vi Ref: Admin.20-14170

17. Primary Area Improvements Project Change Order Attachment Page 17

On February 27, 2019, the Board of Directors awarded a contract to Gateway Pacific Contractors, Inc. (Gateway) for the construction of the Primary Area Improvements Project (PAIP). This project includes upgrades and rehabilitation of the existing grit and screenings facilities and process equipment located in the primary treatment area of the Encina Water Pollution Control Facility (EWPCF). The total cost of the proposed Change Order exceeds the General Manager’s authority and therefore requires Board of Directors approval.

Recommendation:

1. Authorize the General Manager to approve a Change Order to the construction contract between the Encina Wastewater Authority with Gateway Pacific Contractors, Inc. in the amount of $424,532.

2. Discuss and take other action as appropriate.

Staff Reference: Michael Steinlicht, General Manager

~~~END OF DIRECTORS ACTION ITEMS~~~

~~~INFORMATION ITEMS~~~

18. Officer Report

Treasurer/Auditor – LeeAnn Warchol

No Attachment

~~~ END OF INFORMATION ITEMS~~~

~~~NEW BUSINESS~~~

Items to be added to the Agenda must meet all applicable provisions of the Brown Act.

19. General Manager’s Report No Attachment

20. General Counsel’s Report No Attachment

21. Committee Reports

a. Policy & Finance Committee next telephonic meeting date is August 11, 2020 at 10:00 a.m.

b. Capital Improvement Committee next telephonic meeting date is August 19, 2020 at 7:30 a.m.

22. Board of Directors Comments

23. Other Business

Encina Wastewater Authority Board of Directors

July 22, 2020

vii Ref: Admin.20-14170

~~~END OF AGENDA~~~

24. Adjournment

I, Michael Steinlicht, General Manager for Encina Wastewater Authority, hereby certify that the following agenda was posted at the Encina Water Pollution Control Facility at 6200 Avenida Encinas in Carlsbad, California at approximately 3:00 p.m. local time on July 15, 2020.

_____________________________ Michael Steinlicht, General Manager Encina Wastewater Authority (760) 438-3941

MINUTES 

ENCINA WASTEWATER AUTHORITY BOARD OF DIRECTORS MEETING 

WEDNESDAY, JUNE 24, 2020 

ENCINA WATER POLLUTION CONTROL FACILITY VIA TELECONFERENCE 

Ref: Admin.20‐14175 

ALLAN JULIUSSEN, CHAIR  KEITH BLACKBURN, VICE CHAIR 

PRESENT 

City of Carlsbad  Keith Blackburn 

City of Carlsbad  Cori Schumacher 

City of Vista/Buena Sanitation District    Judy Ritter  

City of Vista/Buena Sanitation District  Amanda Rigby 

Vallecitos Water District  Hal Martin 

Vallecitos Water District Jim Hernandez 

Leucadia Wastewater District  Elaine Sullivan 

Leucadia Wastewater District  Allan Juliussen 

City of Encinitas   Catherine Blakespear 

City of Encinitas  Joe Mosca (arrived at 8:10 a.m.) 

General Manager  Michael F. Steinlicht 

Assistant General Manager   Scott McClelland 

General Counsel  Adriana Ochoa 

Auditor/Treasurer  LeeAnn Warchol 

ABSENT 

None. 

ALSO PRESENT 

City of Vista/Buena Sanitation District  Elmer Alex 

City of Carlsbad  Ken Knatz 

City of Encinitas  Isam Hireish, Carl Quiram 

Leucadia Wastewater District  Paul Bushee 

Woodard & Curran  Scott Goldman 

EWA Staff  Jennifer  Basco,  Doug  Campbell,  Vaughn  DeGolyer 

James Kearns, Octavio Navarrete, Tucker Southern, 

Joe Spence, Lindsey Stephenson 

1. CALL TO ORDER

Chair Juliussen called the meeting to order at 8:00 a.m.

2. PLEDGE OF ALLEGIANCE

Director Martin led the Pledge of Allegiance.

6-1

 July 22, 2020 

Encina Wastewater Authority (EWA) Board of Directors Minutes of June 24, 2020 

 

Ref: Admin.20‐14175 

3. GENERAL PUBLIC COMMENT PERIOD 

None. 

4. APPROVAL OF AGENDA  

Upon a motion by Director Martin, seconded by Director Rigby, and carried by the following vote, 

the Board of Directors: 

  Approved the June 24, 2020 agenda. 

Representative  Agency  Vote 

Chair Juliussen  Leucadia Wastewater District  Aye 

Vice Chair Blackburn  City of Carlsbad  Aye 

Director Schumacher  City of Carlsbad  Aye 

Director Rigby  City of Vista  Aye 

Director Ritter  City of Vista  Aye 

Director Rigby  Buena Sanitation District  Aye 

Director Ritter  Buena Sanitation District  Aye 

Director Blakespear  City of Encinitas  Aye 

Director Mosca  City of Encinitas  Absent 

Director Sullivan  Leucadia Wastewater District  Aye 

Director Martin  Vallecitos Water District  Aye 

Director Hernandez  Vallecitos Water District  Aye 

 

5. PRESENTATIONS AND AWARDS 

None. 

~~~CONSENT CALENDAR~~~  

6.  MINUTES OF MAY 27, 2020 

7. OPERATIONS REPORT FOR MAY 2020 

8. EWA MONTHLY FLOW AND CAPACITY MANAGEMENT REPORT FOR MAY 2020 

9. APPROVAL OF DEMANDS FOR MAY 2020 

10. TREASURER’S CASH AND INVESTMENT REPORT FOR MAY 2020 

11. FISCAL YEAR‐TO‐DATE OPERATING BUDGET PERFORMANCE REPORT FOR MAY 2020 

12. FY2020 FOURTH QUARTER OPERATING PROGRAM BUDGET TRANSFERS 

13. ORF 1 FAN REPLACEMENT, EFFLUENT PIPE COATING REPAIR AND MISCELLANEOUS SURGE TOWER 

REPAIRS AWARD 

Upon a motion by Director Ritter, seconded by Director Hernandez, and carried by the following 

vote, the Board of Directors: 

  Approved the Consent Calendar. 

6-2

 July 22, 2020 

Encina Wastewater Authority (EWA) Board of Directors Minutes of June 24, 2020 

 

Ref: Admin.20‐14175 

Representative  Agency  Vote 

Chair Juliussen  Leucadia Wastewater District  Aye 

Vice Chair Blackburn  City of Carlsbad  Aye 

Director Schumacher  City of Carlsbad  Aye 

Director Rigby  City of Vista  Aye 

Director Ritter  City of Vista  Aye 

Director Rigby  Buena Sanitation District  Aye 

Director Ritter  Buena Sanitation District  Aye 

Director Blakespear  City of Encinitas  Aye 

Director Mosca  City of Encinitas  Absent 

Director Sullivan  Leucadia Wastewater District  Aye 

Director Martin  Vallecitos Water District  Aye 

Director Hernandez  Vallecitos Water District  Aye 

 ~~~END OF CONSENT CALENDAR~~~ 

~~~BOARD OF DIRECTORS ACTION ITEMS~~~ 

14. SECONDARY CLARIFIERS AND STRAINERS IMPROVEMENTS CONSTRUCTION AWARD 

Engineering  Services  Manager,  Lindsey  Stephenson  provided  a  brief  history  on  the  Secondary 

Clarifiers and Strainers. The secondary clarifiers are used as the final step in wastewater treatment at 

the EWPCF prior to ocean discharge. The Secondary Clarifiers and Strainers  Improvements Project 

(Project)  will  complete  rehabilitation  in  all  seven  active  clarifiers,  including  coatings,  gate 

rehabilitation  and  replacement,  and minor  structural,  electrical,  and  controls  improvements.  In 

addition, the Project will replace the entire mechanical systems in Clarifiers 5, 6, and 8, which have 

been in service for nearly 30 years, as well as two strainers for the plant water strainers, which have 

been  in  service  for  nearly  40  years.  Each  of  the  proposed  authorizations  exceeds  the  General 

Manager’s authority and  therefore  requires Board of Directors’ approval. The  fiscal  impact of  the 

combined  recommendations  is $7,275,117.  Sufficient  appropriations  are  available  in  the  FY 2021 

Capital Budget to initiate the Project, with additional funding to be included in the future fiscal years. 

Member Agency Managers were briefed on the status of this project in the June meeting. The Capital 

Improvement  Committee  reviewed  this  item  in  their  June  meeting  and  approved  staff’s 

recommendation. 

Upon a motion by Director Hernandez, seconded by Director Ritter, and carried by the following 

vote, the Board of Directors: 

1. Authorized  the  General Manager  to  execute  a  contract with  J.R.  Filanc  Construction 

Company,  Inc.  (Filanc)  in  the amount of $6,202,111  for construction of  the Secondary 

Clarifiers and Strainer Improvements Project (Project). 

2. Authorized  the General Manager  to execute a professional  services agreement  in  the 

amount  not  to  exceed  $831,251  to  Carollo  Engineers  (Carollo)  for  construction 

management services for the Project. 

6-3

 July 22, 2020 

Encina Wastewater Authority (EWA) Board of Directors Minutes of June 24, 2020 

 

Ref: Admin.20‐14175 

3. Authorized  the  General Manager  to  execute  a  professional  services  agreement with 

Woodard & Curran, Inc. (Woodard & Curran) in the amount not to exceed $241,755 for 

engineering services during construction for the Project. 

Representative  Agency  Vote 

Chair Juliussen  Leucadia Wastewater District  Aye 

Vice Chair Blackburn  City of Carlsbad  Aye 

Director Schumacher  City of Carlsbad  Aye 

Director Rigby  City of Vista   

Director Ritter  City of Vista  Aye 

Director Rigby  Buena Sanitation District   

Director Ritter  Buena Sanitation District  Aye 

Director Blakespear  City of Encinitas  Aye 

Director Mosca  City of Encinitas  Aye 

Director Sullivan  Leucadia Wastewater District  Aye 

Director Martin  Vallecitos Water District  Aye 

Director Hernandez  Vallecitos Water District  Aye 

15. COGENERATION BUILDING STRUCTURAL REPAIR PROJECT – TASK ORDER NO. 2 DEMOLITION AND INSTALLATION OF NEW WEST WALL 

Capital Projects Manager, James Kearns provided a brief history of the Cogeneration Building. The 

Cogeneration Building is a critical component of the Encina Water Pollution Control Facility (EWPCF). 

A building condition assessment identified corrosion of the air intake louvers located on the west side 

of the second floor and  irregularities  in the external wall stucco finish. Further  investigation found 

deterioration  and  corrosion  to be  so  advanced  that  the  structural  integrity of  the west wall,  the 

support of the roof and second floor, had been compromised and needed extensive repair. Filanc has 

now  completed  the  shoring  system  installation  and  is  now moving  to  the  demolition  and  wall 

replacement  phase of  the project.  To  expedite  construction  activities,  the General Manager, per 

Section 4.8 of EWA’s Purchasing Policy, authorized the award of Task Order No.2 for the demolition 

and  installation  of  the west wall.  The  total  combined  cost  of  these  actions  exceeds  the General 

Manager’s authority and therefore requires Board of Directors’ approval. Member Agency Managers 

were  briefed  on  this  project  in  their  June  meeting  and  provided  their  support.  The  Capital 

Improvement  Committee  reviewed  this  item  in  their  June  meeting  and  approved  staff’s 

recommendation. The combined fiscal impact of these actions is $2,013,649. Sufficient appropriations 

are available in the Capital Budget to fund this project. 

Director Rigby thanked staff for the report and for showing photos of the extensive damage, which 

justified the need for repairs for the safety of the facility and staff. Director Mosca thanked staff for 

highlighting the issue and inquired about the integrity of the other walls. Mr. Kearns explained that 

condensation  from the marine environment dripped down behind the  louvres and  the stucco and 

migrated into the block wall.  The new west wall will have a longer life than the rest of the building. 

The rebar which is going back inside the wall will be treated. Staff is implementing measures to make 

sure that this will not happen again. All buildings in the facility were subsequently fully assessed to 

confirm that no other similar issues exist. Additional minor corrosion was found in another building, 

which will be repaired. Director Mosca inquired about the new wall structure’s ability to withstand 

6-4

 July 22, 2020 

Encina Wastewater Authority (EWA) Board of Directors Minutes of June 24, 2020 

 

Ref: Admin.20‐14175 

seismic activity. Mr. Kearns  stated  that Carollo Engineers  conducted a  structural analysis and per 

California structural codes, concrete and rebar is the best approach. Director Mosca questioned why 

this project is still considered an emergency if it has been progressing over several years. Mr. Kearns 

informed the Board Members that even though the shoring system is in place, there is still a significant 

risk to the agency with a potential catastrophic failure of the building and the shoring system. Also, 

due to a lot of unknowns with the project, bidding the project out for a fixed price would be unwise 

and would likely include many change orders. The shoring phase was a very complex process and the 

project has been slow and painstaking. EWA wants to ensure that the facility is protected due to the 

critical nature of the equipment in the building.    

Upon a motion by Director Rigby, seconded by Director Hernandez, and carried by the following 

vote, the Board of Directors: 

1. Authorized the General Manager to award a Task Order in the amount of $1,598,465 to 

J.R. Filanc Construction Company Inc. for Cogeneration Building Structural Repair Project 

Demolition and Installation of the West Wall. 

2. Authorized  the  General Manager  to  execute  a  continuation  of  engineering  services 

agreement with Carollo Engineers in the amount not to exceed $415,184 for engineering 

support during construction and construction management services. 

3. Authorized the General Manager to approve the transfer of unexpended appropriations 

from  the  Capital  Improvement  Program  budget  in  the  amount  of  $513,649  to  the 

Cogeneration Building Structural Repair Project. 

Representative  Agency  Vote 

Chair Juliussen  Leucadia Wastewater District  Aye 

Vice Chair Blackburn  City of Carlsbad  Aye 

Director Schumacher  City of Carlsbad  Aye 

Director Rigby  City of Vista  Aye 

Director Ritter  City of Vista  Aye 

Director Rigby  Buena Sanitation District  Aye 

Director Ritter  Buena Sanitation District  Aye 

Director Blakespear  City of Encinitas  Aye 

Director Mosca  City of Encinitas  Aye 

Director Sullivan  Leucadia Wastewater District  Aye 

Director Martin  Vallecitos Water District  Aye 

Director Hernandez  Vallecitos Water District  Aye 

~~~END OF BOARD OF DIRECTORS ACTION ITEMS~~~ 

~~~INFORMATION ITEMS~~~ 

16. OFFICER’S REPORT 

Auditor/Treasurer, LeeAnn Warchol reported on the following items: 

2020 Budget performance is projecting 97% spent. Over half of our operating budget is labor 

related which is coming in right on target. 

6-5

 July 22, 2020 

Encina Wastewater Authority (EWA) Board of Directors Minutes of June 24, 2020 

 

Ref: Admin.20‐14175 

Independent Auditors’ have successfully completed preliminary field testing. They will return 

in September for final field testing. Everything went smoothly. 

17. GENERAL MANAGER’S REPORT 

General Manager, Michael Steinlicht, reported on the following items: 

EWA continues working under modified operations. No infections have been reported by 

staff to date; however, a construction employee did test positive. Due to EWA’s safe work 

practices, it does not appear that transmission was spread to staff. 

For the upcoming month of July, PFC, CIC, MAM, and Board meetings will continue on the 

online platform. 

Director Mosca inquired about the Investment Policy discussion at this month’s PFC meeting. 

General Manager Steinlicht stated that staff is working on the Committee’s direction to look 

outside the organization at investment policies from the member agencies as well as other 

wastewater  agencies.  Staff  plans  on  bringing  the  policy  back  for  board  consideration  in 

August. 

18. GENERAL COUNSEL’S REPORT 

None. 

19. COMMITTEE REPORTS 

a. Policy and Finance Committee: Director Schumacher stated the PFC met on June 9, 2020 and 

discussed  the May  2020  Tactical  Plan  Status  Report;  FY2020  Fourth  Quarter  Operating 

Program  Budget  Transfers;  and  Investment  Policy  Annual  Review.  The  next  meeting  is 

scheduled for July 14, 2020 at 10:00 a.m. 

b. Capital Improvement Committee: Vice Chair Blackburn stated the CIC met on June 17, 2020 

and  discussed  the  Capital  Improvement  Projects  Status  Report;  Secondary  Clarifiers  and 

Strainers Improvements Construction Award; ORF 1 Fan Replacement, Effluent Pipe Coatings 

Repair and Miscellaneous Surge Tower Repairs Award; and Cogeneration Building Structural 

Repair Project – Task Order No. 2 Demolition and  Installation of New West Wall. The next 

meeting is scheduled for July 15, 2020 at 7:30 a.m.  

20. BOARD OF DIRECTORS COMMENTS 

Director Sullivan apologized for interruption to the meeting due to the loss of her internet connection. 

She was able to phone into the meeting, heard all items discussed, and would like the record to reflect 

that she voted “yes” to all  items that required a vote. Director Sullivan also stated that she will be 

6-6

July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors 

Minutes of June 24, 2020 

Ref: Admin.20‐14175 

attending the two‐day WateReuse Annual Conference, which starts today. Chair Juliussen thanked 

staff for a great job and thanked the Board of Directors for their patience. 

21. OTHER BUSINESS

None.

22. ADJOURNMENT

The meeting was adjourned at 8:48 a.m.

ATTEST:  ATTEST:  

______________________________  ______________________________ 

Allan Juliussen, Board Chair  Michael Steinlicht, General Manager 

Encina Wastewater Authority  Encina Wastewater Authority 

6-7

Ref: 20-14176

ENCINA WASTEWATER AUTHORITY

BOARD OF DIRECTORS

Item : 7

Date : July 22, 2020

To : Honorable Chair and Board of Directors

From : Octavio Navarrete, Director of Operations

Issue : OPERATIONS REPORT FOR JUNE 2020

STAFF RECOMMENDS THE BOARD OF DIRECTORS:

Receive and file the Operations Report for June 2020.

FIVE YEAR STRATEGIC BUSINESS PLAN REFERENCE

Strategic Initiative No. 8 requires EWA to provide consistent communication to key stakeholders regarding the operation, maintenance and administration of the Encina Water Pollution Control Facility (EWPCF) and contract operated remote facilities.

DISCUSSION

The Operations Report provides a summary of EWPCF performance metrics, significant activities at the EWPCF and contract operated remote facilities, public outreach activities, odor complaints, completed safety training and recordable injuries.

THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:

Receive and file the Operations Report for June 2020.

Attachment 1: Operations Report June 2020

Prepared by: Blake Bechtold, Operations Shift Supervisor Reviewed by: Joseph Cipollini, Resource Recovery Manager Approved by: Octavio Navarrete, Director of Operations

7-1

ATTACHMENT 1

OPERATIONS REPORT

JUNE 2020

July 22, 2020

7-2

ENCINA WASTEWATER AUTHORITY OPERATIONS REPORT  

June 2020 

Agenda Item No.  7 

1. Wastewater Treatment

The EWPCF maintained 100% compliance with  its National Pollutant Discharge Elimination System(NPDES) ocean discharge permit.

The EWPCF treated on average 20.69 million gallons per day (MGD) of wastewater.

The EWPCF’s removal efficiency averaged 98.18% for Total Suspended Solids (TSS) and 98.09% forCarbonaceous Biochemical Oxygen Demand (CBOD).  EWPCF’s NPDES Permit requires 85% averageremoval efficiency for both TSS and CBOD.

The EWPCF reclaimed on average 5.70 MGD of water for in‐plant use.

A  total of 113.61 million gallons  (MG) of EWPCF secondary effluent was diverted  to  the CarlsbadWater Reclamation Facility (CWRF) for reuse.

A total of 16.59 MG of EWPCF secondary effluent was diverted to Leucadia Wastewater District’sGafner Water Reclamation Facility for reuse.

2. Biosolids Treatment

Processed 8.40 MG of digested sludge through centrifuges as biosolids.

Produced 462.4 dry tons of Class A Exceptional Quality biosolids meeting EPA Part 503 regulationsfor unrestricted reuse.

Produced 136.9 dry tons of Class B biosolids for land application in Yuma.

Produced approximately 23.52 million cubic feet of digester gas with 58.84% methane content foruse in the cogeneration facility and heat dryer.

Biosolids production/distribution:

Dry Tons  Percentage of Total 

Class A Exceptional Quality  462.4  77.2% 

Class B  136.9  22.8% 

Pure Green (Fertilizer)  129.5  21.6% 

Land Application (Yuma)  469.8  78.4% 

7-3

 July 22, 2020 

Encina Wastewater Authority (EWA) Board of Directors Operations Report – June 2020 

Page 2 

Ref: Admin. 20‐14176a        

 

3. Cogeneration Facility 

Produced 1,180,612 kWh of electricity or 85% of total electricity used.   

Generated on average 11,463 cubic feet per minute (CFM) of air for secondary treatment. 

Energy Management Program (EMP) implemented daily from 16:00 to 21:00 for the month of June.  During this period, the EWPCF is isolated from the San Diego Gas and Electric (SDG&E) electrical grid to reduce costs.   

Major overhaul on engine generator #2 completed. 

4. Significant Operations Activities 

Member Agency  vactor  truck  crews  disposed  of  4  loads  of  debris  from  collection  line  cleaning, totaling 1,100 gallons of sewage. 

Received 32 deliveries of fats, oils, and grease (FOG) totaling 127,920 gallons.  Received several trial loads of screened and thickened FOG for evaluation as alternative fuel. 

Received 88 deliveries of brewery waste totaling 429,005 gallons. 

REMOTE FACILITIES 

Carlsbad Water Recycling Facility (CWRF)  

CWRF reclaimed a total of 86.16 MG.  

Ultra‐Filtration System feed pump #4 returned to service. 

Raceway Basin Pump Station (RBPS) 

Monthly generator test performed. 

Generator refueled by Bay City. 

Buena Vista Pump Station (BVPS):  

Monthly generator test performed. 

Generator refueled by Bay City. 

Vandalized fence repaired by contractors. 

Buena Creek Pump Station (BCPS): 

Monthly generator test performed. 

Generator refueled by Bay City. 

 

 

7-4

 July 22, 2020 

Encina Wastewater Authority (EWA) Board of Directors Operations Report – June 2020 

Page 3 

Ref: Admin. 20‐14176a        

 

Agua Hedionda Pump Station (AHPS):  

Monthly generator test performed.   

Monthly bypass pump test performed.  

Agua Hedionda Lift Station (AHLS): 

Monthly generator test performed.  

PUBLIC OUTREACH 

EWA did not perform any public outreach during the month of June. 

ODOR COMPLAINTS 

EWA received one odor complaint during the month of June.  The complaint was from the Altamira neighborhood east of the EWPCF.  Staff performed both plant and site inspections and spoke with the complainant.  Staff investigations identified break through of the carbon media for ORF III.  Prominent Systems replaced the carbon media in the West tower and will be replacing the carbon media in the East tower next month. 

COMPLETION OF SAFETY TRAINING:   

Topic  OPS  TS  EC  ADMIN 

HAZWOPER # 4  100%  100%  100%  100% 

Heat Dryer SOP 63/ Andritz Module # 7  100%       

EWA COVID‐19  100%  100%  100%  89% 

NEO  100%       

 

INJURY REPORT: 

There was one OSHA recordable incident for the month of June.   

 

 

7-5

 July 22, 2020 

Encina Wastewater Authority (EWA) Board of Directors Operations Report – June 2020 

Page 4 

Ref: Admin. 20‐14176a        

 

5

10

15

20

25

30

35

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2020

MGD Influent Distribution

EWPCF CWRF GWRF Outfall  

85%

0%

25%

50%

75%

100%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2020

Plant Efficiency

TSS Removal CBOD Removal  

Gafner was offline in January and February. 

 

NPDES permit requires a minimum of 85% removal.

100

200

300

400

500

600

700

800

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2020

Dry Tons Biosolids Distribution

Tier I Tier II Class B   Tier II demand is less during winter months 

Class B production due to dryer outages. 

83%

82% 84

%

85%

85%

85%

84%

84%

84%

83%

85%

85%

0%

25%

50%

75%

100%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2020

Electricity Source

Produced Purchased 

 

Normalized for number of days in each month.

 

7-6

ENCINA WASTEWATER AUTHORITY | Key Performance Indicators FY2020 June 30, 2020

ref: Admin: 20 1417 b

hours per employee(annualized)

% of salaries total injury rate employee turnover %(excluding retirements)

complaints

Training Overtime Safety Attrition Odor

PureGreen Class A Production The Operations Team uses the heat drying process to produce a Class A Biosolidknown as PureGreen fertilizer which can be directly applied to land. This metricillustrates the percentage of wastewater solids converted into Class A. This maygradually decline as solids receiving increases and heat dryer capacity is reached.

Alternative Fuel Receiving The Alternative Fuel Receiving Facility receives deliveries of Fats, Oils, Grease(FOG) and Brewery Waste. EWA earns tipping fees for receiving these andgenerates additional methane gas by feeding it into the digesters. This metricillustrates the monthly average gallons of FOG and Brewery Waste received.

Operating Costs per Million Gallons Treated This metric depicts each month's rolling 12 month costper million gallons treated. EWA's operating costs arelargely driven by labor, energy and chemical consumption.Because much of this is commodity price driven, weanticipate the cost per million gallons to increasing by aninflationary rate, all else being equal. This graphillustrates FY2018 costs gradually increasing as a result oftwo additional staff coming onboard to reduceoperational safety risks. In FY2019, energy costsescalated, though these costs were offset by additionalgallons being treated at a low marginal cost. FY2020 costsremain relatively steady.

Encina Water Pollution Control Facility

Proactive Maintenance The Technical Services Team focuses on performing preventive maintenance in aneffort to support equipment reliability and service life, and in turn, reducereactive costs. It is standard for two thirds of maintenance activities in treatmentplants to be proactive in nature, but staff has self imposed a higher goal.

These key performance indicators illustrate various aspects of the EWA's operations with historical performance,industry benchmarks and self imposed goals.

NPDES Permit Compliance EWA holds a National Pollutant Discharge Elimination System (NPDES) Permitissued by the Regional Water Quality Control Board for discharge from the EncinaOcean Outfall. In March 2018, the facility received a permit violation afterexperiencing a plant upset for the first time in nine years.

Electricity Onsite Generation EWA generates the majority of its Treatment Plant electricity demand onsitethrough its Cogeneration System whereby methane gas is used as an alternativefuel source. Historical onsite generation has been at 80%, but staff implementedoperational changes in FY2019 in hopes of making 90% the future benchmark.

Item 7

32.1EWA yrs

Goal yrs

88%86%

84%FY 2020

GoalFY 2019

$1,350

$1,450

$1,550

Jul Oct Jan Apr

FY 2018 FY 2019 FY 2020

75%77%78%FY 2020

GoalFY 2019

73%76%

85%FY 2020

GoalFY 2019

545,000585,555

475,032FY 2020 Avg.

GoalFY 2019 Avg.

3040 38

FY20Goal FY19

3 3 2

FY20Goal FY19

<2.3% 2.9% 7.0%

FY20Goal FY19

3.0

0FY20Goal FY19

<1.6 7.0

8.6 1FY20

Goal FY19

<<

galgal

gal

7-7

 Ref: Admin.20‐14174 

ENCINA WASTEWATER AUTHORITY 

BOARD OF DIRECTORS 

Item   :  8 

Date  :  July 22, 2020 

To  :  Honorable Chair and Board of Directors 

From  :  Doug Campbell, Director of Environmental Compliance 

Issue    :  EWA MONTHLY FLOW AND CAPACITY MANAGEMENT REPORT FOR JUNE 2020 

STAFF RECOMMENDS THE BOARD OF DIRECTORS:  

Receive and file the Flow and Capacity Management Report for June 2020. 

FIVE‐YEAR STRATEGIC BUSINESS PLAN REFERENCE 

Strategic Initiative No. 8: Engage key stakeholders. 

DISCUSSION 

Attachment  1  is  the  Member  Agency  Flow  and  Capacity  Management  Report  for  June  2020.  EWA continues to ensure adequate capacity to meet projected needs. 

THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

Receive and file the Flow and Capacity Management Report for June 2020. 

Attachment 1:  EWA Flow and Capacity Management Report for June 2020 

Prepared by:  Jeff Parks, Laboratory Manager Reviewed by:  Rachael Morgan, Associate Chemist Approved by:   Doug Campbell, Director of Environmental Compliance 

8-1

                        

  

    

 

ATTACHMENT 1 

EWA FLOW AND CAPACITY MANAGEMENT REPORT FOR  

JUNE 2020 

 

 

 

              

       

July 22, 2020 

8-2

Agenda Item No. 8

Ref: Admin. 20 14174

Phase V % of Capacity

Member Current Projected Available % of Capacity Used and

Agency Flow Committed Capacity Capacity (a) Used (b) Committed (c)

Vista * 5.75 0.084 10.67 4.84 54% 55%

Carlsbad 6.35 1.694 10.26 2.22 62% 78%

Buena* 1.91 0.012 3.00 1.08 64% 64%

Vallecitos* 3.55 0.017 7.67 4.10 46% 47%

Leucadia 3.88 0.055 7.11 3.17 55% 55%

Encinitas 0.91 0.155 1.80 0.73 51% 59%

Total 22.35 2.02 40.51 16.14 55% 60%

Phase V % of Capacity

Member Current Projected Available % of Capacity Used and

Agency Flow Committed Capacity Capacity (a) Used (b) Committed (c)

Vista* 5.75 0.084 10.67 4.84 54% 55%

Carlsbad 6.35 1.694 10.26 2.22 62% 78%

Buena (d)* 1.91 0.012 3.00 1.08 64% 64%

Vallecitos (d)* 6.98 0.017 10.47 3.47 67% 67%

Leucadia (d) 3.88 0.055 7.11 3.17 55% 55%

Encinitas 0.91 0.155 1.80 0.73 51% 59%

Total 25.78 2.02 43.31 15.51 60% 64%

Phase V % of Capacity

Member Current Projected Available % of Capacity Used and

Agency Flow Committed Capacity Capacity (a) Used (b) Committed (c)

Vista* 5.75 0.084 10.67 4.84 54% 55%

Carlsbad (f) 3.48 1.694 10.26 5.09 34% 50%

Buena (e) * 1.91 0.012 3.00 1.08 64% 64%

Vallecitos (e) * 3.55 0.017 10.47 6.90 34% 34%

Leucadia (f) 3.49 0.055 7.11 3.56 49% 50%

Encinitas 0.91 0.155 1.80 0.73 51% 59%

Total 19.09 2.02 43.31 22.20 44% 49%

All units are in Million Gallons Per Day (MGD) unless specified otherwise.

(a) Available capacity = (Member Agency Phase V Projected Capacity) (Current + Committed Flows)

(b) % Capacity Used = Current Flow / Member Agency Phase V Projected Capacity

(c) % Capacity Used and Committed = (Current Flow + Committed) / Member Agency Phase V Projected Capacity

(d) To determine the total solids flow, the plant influent from the reclamation facilities is added to the raw wastewater flow.

(e) To determine the total outfall flow, the reclamation failsafe line flow is added to the raw wastewater flow.

(f) To determine LWD and CARLSBAD Outfall Flow, the corresponding recycled flow is subtracted from influent flows.

* Arbor Ranch Flows and Rancho Santalina Flows are subtracted from Vista and Buena and are added to Vallecitos

ENCINA WATER POLLUTION CONTROL FACILITIES CAPACITY MANAGEMENT REPORT

June 2020

TREATMENT PLANT LIQUID

TREATMENT PLANT SOLIDS

OUTFALL FLOW

8-3

ITEM 9 APPROVAL OF DEMANDS DASHBOARD FOR JUNE 2020

Operating 1,933,855$

Capital 3,246,966$

June Demands 5,180,820$

YTD Demands 47,280,605$

FY2020 Budget 38,086,184$

FY19 Cap. Carryforward 19,563,429$

Total 57,649,613$

646 invoices processed

*124% of the 2020 budget spent asa result of the FY 2019 CapitalCarryforward being used

Summary

14% 124%51%

49%

YTD

2020 Budget*37%

63%

June

2020 Budget

$1532 K

$110 K$120 K$151 K$157 K$215 K$236 K$256 K$327 K$399 K$309K

OTHER

CDM SMITH

STANEK CONSTRUCTORS, INC.

LOGICALIS

JR FILANC CONSTRUCTION COMPANY INC

CAROLLO ENGINEERS, INC.

CDW GOVERNMENT

KENNEDY JENKS CONSULTING

SAN DIEGO GAS & ELECTRIC

GATEWAY PACIFIC CONTRACTORS, INC.

HAWTHORNE POWER SYSTEMS

Top 10 VendorsDemands Mix

$4,192K

Vendors81%

$989K

Payroll19%

$3.2 M

$1.9 M

$1.0 M

$2.0 M

$3.0 M

$4.0 M

$5.0 M

$6.0 M

$7.0 M

$8.0 M

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY2020

Historical Trend

This represents unaudited data. 9-1

Ref: F&HR.20 4028

ENCINA WASTEWATER AUTHORITY

BOARD OF DIRECTORS

Item : 9

Date : July 22, 2020

To : Honorable Chair and Board of Directors

From : LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor

Issue : APPROVAL OF DEMANDS FOR JUNE 2020

STAFF RECOMMENDS THE BOARD OF DIRECTORS:

Approve checks and electronic payments totaling $5,180,820.46.

FIVE YEAR STRATEGIC BUSINESS PLAN REFERENCE

Strategic Initiative No. 6: Continue fiscal responsibility and revenue generation.

DISCUSSION

Attached are Warrants for Payment and Check Registers describing all payments made by EWA for themonth ended June 2020.

The Operating Program expenses totaled $1,933,854.92 and the Capital Improvement Program expensestotaled $3,246,965.54. Properly authorized current or prior year appropriations are budgeted to fundeach payment presented. Questions should be directed to LeeAnn Warchol at (760) 268 8849.

THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:

Approve checks and electronic payments totaling $5,180,820.46.

Attachment 1 Summary of Demands by Account June 2020Attachment 2 Payroll Warrant for Payment & Check Register June 01, 2020Attachment 3 Payroll Warrant for Payment & Check Register June 03, 2020Attachment 4 Payroll Warrant for Payment & Check Register June 05, 2020Attachment 5 Payroll Warrant for Payment & Check Register June 17, 2020Attachment 6 Payroll Warrant for Payment & Check Register June 24, 2020Attachment 7 Flex Benefit Reimbursement Check Register June 2020Attachment 8 Accounts Payable Check Register June 2020

Prepared by: Grace Gilberg, Accounting Technician IIReviewed by: Mariana Grindley, Accounting Technician IIApproved by: LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor

9-2

ATTACHMENT 1

SUMMARY OF DEMANDS BY ACCOUNT

JUNE 2020

July 22, 2020

9-3

Date Class Description and Check #s Amounts

06.01.20 PR Misc Payroll Tax $ 130.53PR Misc Calpers Retirement $ 195.99

AP AP Regular Cks 189074 189116, EFT's 4232 4279 $ 947,267.93PR AP Payroll Cks 189095,189098,189113, EFT's 4240,4261,4271,4272 $ 151,904.64PR Flex Cks 294.00

PR Payroll Direct Deposit $ 203,410.75PR Payroll Tax $ 56,960.01PR Calpers Retirement $ 56,948.10PR Misc PR Cks 3360 $ 441.17

06.05.20 PR Misc Payroll tax $ 6.94

06.12.20 PR Flex Cks $ 1,565.41

06.16.20 PR Flex Cks $ 280.06

06.17.20 AP AP Regular Cks 189117 189177, EFT's 4280 4330 $ 1,923,648.85PR AP Payroll Cks 189127, EFT's 4293,4307,4308,4315 $ 67,531.19PR Payroll Direct Deposit $ 198,057.35PR Payroll Cks 3361 $ 1,671.95PR Payroll Tax $ 55,781.82PR Calpers Retirement $ 55,807.24

06.18.20 PR Flex Cks $ 30.00

06.22.20 PR Flex Cks $ 445.00

06.24.20 AP VOID Check 4324 $ (846.44)PR Misc PR cks 3362 $ 349.75

06.25.20 AP Bank Fee $ 1,266.80

06.17.20 AP AP Regular Cks 189178 189227, EFT's 4331 4733 $ 1,320,370.15PR AP Payroll Cks 189189,189211, EFT's 4358,4367,4369 $ 137,301.27

Total $ 5,180,820.46

Payroll $ 989,113.17Operating & Capital $ 4,191,707.29

Total $ 5,180,820.46

SUMMARY OF DEMANDSJUNE 2020

06.02.20

06.03.20

9-4

ATTACHMENT 2

PAYROLL WARRANT FOR PAYMENT & CHECK REGISTER

JUNE 01, 2020

July 22, 2020

9-5

Employee ID /Vendor #

Vendor Name Check Date Net Amount Advice #/Check #

INTERNAL REVENUE SERVICE 6/1/2020 130.53CALIFORNIA STATE TAX 6/1/2020 195.99SUBTOTAL TAX LIABILITY $ 326.52

PAYROLL GRAND TOTAL $ 326.52

MISC PAYROLL 6/01/2020CHECK DATE 6/01/2020

9-6

ATTACHMENT 3

PAYROLL WARRANT FOR PAYMENT & CHECK REGISTER

JUNE 03, 2020

July 22, 2020

9-7

Employee ID /Vendor #

Vendor Name Check Date Net Amount Advice #/Check #

2093 6/3/2020 2,189.33 270902089 6/3/2020 2,110.75 270912092 6/3/2020 2,045.28 270922085 6/3/2020 5,558.25 270938191 6/3/2020 2,567.26 270942083 6/3/2020 3,576.87 270958081 6/3/2020 5,765.83 270968180 6/3/2020 4,100.03 270975200 6/3/2020 1,524.85 270985192 6/3/2020 3,020.45 270998182 6/3/2020 2,537.57 271005056 6/3/2020 3,167.72 271015177 6/3/2020 3,834.39 271025197 6/3/2020 2,138.08 271035204 6/3/2020 2,566.94 271045185 6/3/2020 3,579.43 271055188 6/3/2020 3,345.46 271065209 6/3/2020 1,715.15 271072065 6/3/2020 2,456.77 271088150 6/3/2020 2,670.53 271095171 6/3/2020 2,913.93 271105198 6/3/2020 2,441.11 271115174 6/3/2020 4,023.43 271125202 6/3/2020 3,519.39 271135193 6/3/2020 2,931.75 271145208 6/3/2020 2,139.55 271155195 6/3/2020 3,158.04 271165191 6/3/2020 2,778.27 271175190 6/3/2020 2,490.91 271185207 6/3/2020 2,067.96 271195176 6/3/2020 3,669.12 271205178 6/3/2020 2,895.68 271215203 6/3/2020 3,154.67 271225181 6/3/2020 3,067.51 271235161 6/3/2020 4,985.89 271245184 6/3/2020 2,727.72 271255206 6/3/2020 2,114.36 271268189 6/3/2020 2,051.33 271278208 6/3/2020 2,014.36 271282056 6/3/2020 2,630.04 271298215 6/3/2020 2,548.22 271308192 6/3/2020 3,049.86 271318200 6/3/2020 3,314.83 271328188 6/3/2020 2,962.88 271338168 6/3/2020 3,748.79 271348217 6/3/2020 1,769.85 27135

PAY PERIOD 5/14/2020 5/27/2020CHECK DATE 6/3/2020

9-8

PAY PERIOD 5/14/2020 5/27/2020CHECK DATE 6/3/2020

2063 6/3/2020 2,163.43 271368184 6/3/2020 3,136.00 271378178 6/3/2020 3,407.88 271388203 6/3/2020 2,126.69 271392058 6/3/2020 2,260.45 271408196 6/3/2020 3,325.04 271418186 6/3/2020 2,282.88 271422087 6/3/2020 4,696.25 271438201 6/3/2020 2,677.59 271442091 6/3/2020 3,685.58 271458216 6/3/2020 2,709.22 271468171 6/3/2020 3,348.65 271472090 6/3/2020 1,001.87 271483117 6/3/2020 4,266.82 271493201 6/3/2020 2,407.79 271503203 6/3/2020 1,698.51 271513184 6/3/2020 3,619.34 271523185 6/3/2020 2,473.86 271533177 6/3/2020 2,604.50 271543202 6/3/2020 1,990.45 271553189 6/3/2020 3,413.75 271563198 6/3/2020 2,993.77 271573197 6/3/2020 2,033.20 271582071 6/3/2020 3,446.84 27159

SUBTOTAL DIRECT DEPOSIT $ 203,410.75

2065 6/3/2020 441.17 3360SUBTOTAL MISC PAYROLL CHECKS $ 441.17

INTERNAL REVENUE SERVICE 6/3/2020 43,834.46CALIFORNIA STATE TAX 6/3/2020 13,125.55SUBTOTAL TAX LIABILITY $ 56,960.01

CALPERS RETIREMENT 6/3/2020 56,948.10SUBTOTAL CALPERS $ 56,948.10

PAYROLL GRAND TOTAL $ 317,760.03

9-9

ATTACHMENT 4

PAYROLL WARRANT FOR PAYMENT & CHECK REGISTER

JUNE 05, 2020

July 22, 2020

9-10

Employee ID /Vendor #

Vendor Name Check Date Net Amount Advice #/Check #

INTERNAL REVENUE SERVICE 6/5/2020 6.94SUBTOTAL TAX LIABILITY $ 6.94

PAYROLL GRAND TOTAL $ 6.94

MISC PAYROLL 6/05/2020CHECK DATE 6/05/2020

9-11

ATTACHMENT 5

PAYROLL WARRANT FOR PAYMENT & CHECK REGISTER

JUNE 17, 2020

July 22, 2020

9-12

Employee ID /Vendor #

Vendor Name Check Date Net Amount Advice #/Check #

2093 6/17/2020 2,189.33 271662089 6/17/2020 2,110.75 271672092 6/17/2020 2,045.28 271682085 6/17/2020 5,558.25 271698191 6/17/2020 2,567.26 271702083 6/17/2020 3,576.87 271718081 6/17/2020 5,765.83 271728180 6/17/2020 4,565.16 271735200 6/17/2020 1,611.65 271745192 6/17/2020 3,165.71 271758182 6/17/2020 2,249.24 271765056 6/17/2020 2,817.81 271775177 6/17/2020 3,834.39 271785197 6/17/2020 1,850.87 271795204 6/17/2020 2,735.94 271805185 6/17/2020 3,136.44 271815188 6/17/2020 2,864.66 271825209 6/17/2020 1,778.59 271832065 6/17/2020 2,916.69 271848150 6/17/2020 3,554.81 271855171 6/17/2020 2,913.94 271865198 6/17/2020 2,490.61 271875174 6/17/2020 4,023.43 271885202 6/17/2020 2,632.02 271895193 6/17/2020 2,687.53 271905208 6/17/2020 2,077.94 271915195 6/17/2020 2,641.60 271925191 6/17/2020 2,858.59 271935190 6/17/2020 2,490.97 271945207 6/17/2020 1,778.63 271955176 6/17/2020 3,489.40 271965178 6/17/2020 2,990.75 271975203 6/17/2020 2,323.30 271985181 6/17/2020 3,067.50 271995161 6/17/2020 5,246.63 272005184 6/17/2020 2,358.63 272015206 6/17/2020 2,052.62 272028189 6/17/2020 2,006.29 272038208 6/17/2020 1,681.45 272042056 6/17/2020 2,630.04 272058215 6/17/2020 2,147.67 272068192 6/17/2020 3,244.74 272078200 6/17/2020 3,225.48 272088188 6/17/2020 2,310.61 272098168 6/17/2020 3,748.78 272108217 6/17/2020 1,769.85 27211

PAY PERIOD 5/28/2020 6/10/2020CHECK DATE 6/17/2020

9-13

PAY PERIOD 5/28/2020 6/10/2020CHECK DATE 6/17/2020

2063 6/17/2020 2,007.16 272128184 6/17/2020 2,002.48 272138178 6/17/2020 3,407.87 272148203 6/17/2020 2,126.69 272152058 6/17/2020 2,260.46 272168196 6/17/2020 3,325.04 272178186 6/17/2020 2,282.88 272182087 6/17/2020 4,696.25 272198201 6/17/2020 2,456.19 272202091 6/17/2020 3,685.58 272218216 6/17/2020 2,709.22 272228171 6/17/2020 3,348.65 272232090 6/17/2020 1,147.79 272243117 6/17/2020 4,266.82 272253201 6/17/2020 2,587.96 272263203 6/17/2020 1,816.28 272273184 6/17/2020 3,619.34 272283185 6/17/2020 2,658.33 272293177 6/17/2020 2,604.50 272303202 6/17/2020 1,990.46 272313189 6/17/2020 3,413.76 272323198 6/17/2020 2,379.07 272333197 6/17/2020 2,033.20 272342071 6/17/2020 3,446.84 27235

SUBTOTAL DIRECT DEPOSIT $ 198,057.35

5210 6/17/2020 1,671.95 3361SUBTOTAL PAYROLL CHECKS $ 1,671.95

INTERNAL REVENUE SERVICE 6/17/2020 42,996.58CALIFORNIA STATE TAX 6/17/2020 12,785.24SUBTOTAL TAX LIABILITY $ 55,781.82

CALPERS RETIREMENT 6/17/2020 55,807.24SUBTOTAL CALPERS $ 55,807.24

PAYROLL GRAND TOTAL $ 311,318.36

9-14

ATTACHMENT 6

PAYROLL WARRANT FOR PAYMENT & CHECK REGISTER

JUNE 24, 2020

July 22, 2020

9-15

Employee ID /Vendor #

Vendor Name Check Date Net Amount Advice #/Check #

5198 6/24/2020 349.75 3362SUBTOTAL MISC PAYROLL CHECKS $ 349.75

PAYROLL GRAND TOTAL $ 349.75

MISC PAYROLL 6/24/2020CHECK DATE 6/24/2020

9-16

ATTACHMENT 7

FLEX BENEFIT REIMBURSEMENT CHECK REGISTER

JUNE 2020

July 22, 2020

9-17

Check No. Employee No. Check Date Amount Plan Year

7472539 3117 6/2/2020 $ 294.00 2020$ 294.00

7512763 2091 6/12/2020 $ 1,565.41 2020$ 1,565.41

7526849 8081 6/16/2020 $ 280.06 2020$ 280.06

7536473 8196 6/18/2020 $ 30.00 2020$ 30.00

7545502 8201 6/22/2020 $ 445.00 2020$ 445.00

Total for Month $ 2,614.47

Encina Wastewater AuthorityFlexible Spending Reimbursement Register for the Month Ended June 2020

9-18

ATTACHMENT 8

ACCOUNTS PAYABLE CHECK REGISTER

JUNE 2020

July 22, 2020

9-19

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

1689

AFFO

RDAB

LEDR

AIN

SERV

ICE

INC

1158

8045

042

326/

2/20

2072

0.00

2214

AMAN

DAYO

UNG

RIGB

YRI

GBY

BOD

05/2

042

336/

2/20

2021

3.21

2214

AMAN

DAYO

UNG

RIGB

YRI

GBY

PFC

05/2

042

336/

2/20

2021

3.21

2254

AMER

ICAN

SECU

RITY

GROU

P26

472

4234

6/2/

2020

4,06

1.76

1759

AMET

EKAR

IZON

AIN

STRU

MEN

T,LL

CA0

0000

3532

7742

356/

2/20

2013

,912

.04

1623

ANDR

ITZ

SEPA

RATI

ONIN

C84

8009

8878

4236

6/2/

2020

9,00

9.96

1623

ANDR

ITZ

SEPA

RATI

ONIN

C84

8009

8879

4236

6/2/

2020

4,85

4.65

1623

ANDR

ITZ

SEPA

RATI

ONIN

C84

8009

8880

4236

6/2/

2020

2,64

7.74

2207

ARBO

NEQ

UIPM

ENT

CORP

ORAT

ION

2280

877

4237

6/2/

2020

3,15

2.97

977

CALI

FORN

IAEN

VIRO

NMEN

TALC

ONTR

OLS

INC

4225

4238

6/2/

2020

481.

0297

7CA

LIFO

RNIA

ENVI

RONM

ENTA

LCON

TROL

SIN

C42

2642

386/

2/20

202,

806.

0413

64CA

LIFO

RNIA

WAT

ERTE

CHNO

LOGI

ES37

481

4239

6/2/

2020

5,68

2.56

1364

CALI

FORN

IAW

ATER

TECH

NOLO

GIES

3748

942

396/

2/20

206,

066.

5513

64CA

LIFO

RNIA

WAT

ERTE

CHNO

LOGI

ES37

408

4239

6/2/

2020

6,64

9.91

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8691

842

416/

2/20

204,

542.

0017

96CA

ROLL

OEN

GINE

ERS,

INC.

0186

919

4241

6/2/

2020

7,83

6.75

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8715

842

416/

2/20

209,

123.

9017

96CA

ROLL

OEN

GINE

ERS,

INC.

0187

159

4241

6/2/

2020

2,93

8.50

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8716

142

416/

2/20

202,

333.

7517

96CA

ROLL

OEN

GINE

ERS,

INC.

0187

162

4241

6/2/

2020

950.

0017

96CA

ROLL

OEN

GINE

ERS,

INC.

0187

163

4241

6/2/

2020

6,62

5.00

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8716

442

416/

2/20

201,

522.

5017

96CA

ROLL

OEN

GINE

ERS,

INC.

0187

483

4241

6/2/

2020

21,4

37.2

517

96CA

ROLL

OEN

GINE

ERS,

INC.

0187

486

4241

6/2/

2020

12,1

54.3

122

91CA

THER

INE

BLAK

ESPE

ARBL

AKES

PEAR

BOD

05/2

042

426/

2/20

2021

3.21

2291

CATH

ERIN

EBL

AKES

PEAR

BLAK

ESPE

ARPF

C05

/20

4242

6/2/

2020

213.

2123

11CD

MSM

ITH

9009

9159

4243

6/2/

2020

9,59

5.00

1440

CDW

GOVE

RNM

ENT

XWN5

715

4244

6/2/

2020

55.1

014

40CD

WGO

VERN

MEN

TXW

Q47

242

446/

2/20

201,

473.

6814

40CD

WGO

VERN

MEN

TXS

K121

242

446/

2/20

201,

477.

4714

40CD

WGO

VERN

MEN

TXT

V941

742

446/

2/20

2041

7.04

1440

CDW

GOVE

RNM

ENT

XTV9

782

4244

6/2/

2020

2,61

9.27

1440

CDW

GOVE

RNM

ENT

XTW

9590

4244

6/2/

2020

1,55

9.55

1440

CDW

GOVE

RNM

ENT

XTX5

275

4244

6/2/

2020

687.

5414

40CD

WGO

VERN

MEN

TXT

X531

642

446/

2/20

201,

411.

2314

40CD

WGO

VERN

MEN

TXV

F014

242

446/

2/20

2012

1,92

1.13

1440

CDW

GOVE

RNM

ENT

XVJ9

979

4244

6/2/

2020

2,46

8.92

1440

CDW

GOVE

RNM

ENT

XVL2

018

4244

6/2/

2020

513.

74C

1440

CDW

GOVE

RNM

ENT

XVP3

660

4244

6/2/

2020

4,39

0.22

1440

CDW

GOVE

RNM

ENT

XVQ

1531

4244

6/2/

2020

4,25

7.00

118

CONS

OLID

ATED

ELEC

TRIC

ALDI

STRI

BUTO

RS,I

NC.

0949

5508

9942

456/

2/20

2072

.06

118

CONS

OLID

ATED

ELEC

TRIC

ALDI

STRI

BUTO

RS,I

NC.

0949

5509

2742

456/

2/20

2049

.39

118

CONS

OLID

ATED

ELEC

TRIC

ALDI

STRI

BUTO

RS,I

NC.

0949

5556

3242

456/

2/20

2034

.58

2486

CORI

NNE

SCHU

MAC

HER

SCHU

MAC

HER

BOD

05/2

042

466/

2/20

2021

3.21

2486

CORI

NNE

SCHU

MAC

HER

SCHU

MAC

HER

PFC

05/2

042

476/

2/20

2021

3.21

1520

DGS

OFS

SERV

ICE

REVO

LVIN

GFU

ND14

1845

942

486/

2/20

2041

,806

.08

2182

DSSE

RVIC

ESOF

AMER

ICA

INC

1394

9775

0515

2042

496/

2/20

2038

4.95

1722

ELAI

NESU

LLIV

ANSU

LLIV

ANBO

D05

/20

4250

6/2/

2020

213.

2117

22EL

AINE

SULL

IVAN

SULL

IVAN

PFC

05/2

042

506/

2/20

2021

3.21

208

ELEC

TRIC

ALSA

LES

INC.

0542

0803

4251

6/2/

2020

195.

3020

8EL

ECTR

ICAL

SALE

SIN

C.05

6883

0242

516/

2/20

2019

2.87

208

ELEC

TRIC

ALSA

LES

INC

0568

8304

4251

6/2/

2020

219.

7623

58EN

TERP

RISE

AUTO

MAT

ION

7883

4252

6/2/

2020

5,24

3.75

1430

ENTE

RPRI

SEIN

DUST

RIAL

SUPP

LYIN

C66

545

4253

6/2/

2020

980.

3414

30EN

TERP

RISE

INDU

STRI

ALSU

PPLY

INC

6655

842

536/

2/20

203,

059.

6814

30EN

TERP

RISE

INDU

STRI

ALSU

PPLY

INC

6652

342

536/

2/20

201,

995.

7921

9EN

VIRO

NMEN

TALR

ESOU

RCE

ASSO

CIAT

ES93

8846

4254

6/2/

2020

2,11

9.58

221

ESCO

NDID

OM

ETAL

SUPP

LY73

7917

4255

6/2/

2020

1,33

6.10

2320

FINA

LTOU

CHLA

NDSC

APIN

G16

842

566/

2/20

203,

500.

0023

20FI

NALT

OUCH

LAND

SCAP

ING

169

4256

6/2/

2020

1,88

0.00

240

FISH

ERSC

IENT

IFIC

8706

452

4257

6/2/

2020

860.

8124

0FI

SHER

SCIE

NTIF

IC91

4757

542

576/

2/20

2049

4.58

268

GRAI

NGER

INC

9526

3080

0342

586/

2/20

2024

.22

LAND

SCAP

ING

SERV

ICES

LAND

SCAP

ING

SERV

ICES

LAB

SUPP

LIES

EQUI

PMEN

TPH

REPL

ACEM

ENT

PROB

ESGE

NERA

LPLA

NTRE

PAIR

PART

S

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESHE

ATLO

OPPU

MP

MOT

ORIN

VENT

ORY

MOT

ORFO

ULAI

RIN

VENT

ORY

BEAR

INGS

FOR

CENT

FEED

PUM

PLA

BSU

PPLI

ESER

AQ

CSE

COND

ARIE

SEF

FLUE

NTPU

MP

REHA

BILI

TATI

ON

PFC

MEE

TING

05/1

2/20

AERA

TION

PROJ

ECT

PIPI

NG&

ELEC

TRIC

ALRE

PAIR

PIPI

NG&

ELEC

TRIC

ALRE

PAIR

TASK

ORDE

RNO

.17

SCAD

ADE

SIGN

SUPP

ORT

ONNE

TWOR

KIM

PROV

EMEN

TSPR

OJEC

TDE

SIGN

BOD

MEE

TING

05/2

7/20

PFC

MEE

TING

05/1

2/20

NATU

RALG

ASAP

RIL

FY20

20DR

INKI

NGW

ATER

SERV

ICES

BOD

MEE

TING

05/2

7/20

CIP

PLAN

TSE

CURI

TYCA

MER

ASSE

RVER

SCI

PPL

ANT

SECU

RITY

CAM

ERAS

SERV

ERS

PIPI

NGAN

DEL

ECTR

ICAL

REPA

IRPI

PING

AND

ELEC

TRIC

ALRE

PAIR

PIPI

NGAN

DEL

ECTR

ICAL

REPA

IR

INFO

RMAT

ION

SYST

EMS

POCK

ETTH

ERM

ALCA

MER

AIN

FORM

ATIO

NSY

STEM

SGR

APHI

CCA

RDCI

PHO

STSE

RVER

REPL

ACEM

ENT

INFO

RMAT

ION

SYST

EMS

IPAD

AND

APPL

EPE

NCIL

INFO

RMAT

ION

SYST

EMS

IPAD

AND

APPL

EPE

NCIL

INFO

RMAT

ION

SYST

EMS

HARD

WAR

EIN

FORM

ATIO

NSY

STEM

SBA

TTER

IES

AND

CHAN

GING

MOD

INFO

RMAT

ION

SYST

EMS

HARD

WAR

EIN

FORM

ATIO

NSY

STEM

SSO

FTW

ARE

WAT

CHGU

ARD

FIRE

BOX

INFO

RMAT

ION

SYST

EMS

CANO

NSC

ANNE

R

COGE

NBL

DGST

RUCT

URAL

REPA

IRPR

OJEC

TES

DC&

CMBO

DM

EETI

NG05

/27/

20PF

CM

EETI

NG05

/20/

20SC

ADA

NETW

ORK

INFR

ASTR

UCTU

REIM

PROV

EMEN

TSPR

OJEC

TPH

ASE

1ES

DCPI

PING

AND

ELEC

TRIC

ALRE

PAIR

SURG

EPR

OTEC

TOR

LAND

OUTF

ALLR

EPAI

RPR

OJEC

TES

DCSI

MUL

TANE

OUS

CLAS

SA/

BLO

ADOU

TFY

2020

ASNE

EDED

CONS

TRUC

TABI

LITY

REVI

EWOR

F1FA

NRE

PLAC

EMEN

TEV

ALUA

TION

UPDA

TERE

VENU

EAN

DFI

NANC

IALP

ROGR

AM

FY20

20FE

RRIC

CHLO

RIDE

EQUA

LIZA

TION

BASI

NSE

TTLE

MEN

TEQ

UALI

ZATI

ONBA

SIN

SETT

LEM

ENT

ODOR

CONT

ROLM

ASTE

RPL

ANEN

GINE

ERIN

GSE

RVIC

ESCO

GEN

BLDG

.STR

UCTU

RALR

EPAI

RPR

OJEC

TES

DC&

CM

SPEC

IALT

YSE

RVIC

ESNO

RTH

BARN

DOOR

REPA

IRIN

VENT

ORY

PLAT

EIN

VENT

ORY

REST

OCK

FY20

20FE

RRIC

CHLO

RIDE

FY20

20FE

RRIC

CHLO

RIDE

PAR

INST

ALLA

TION

OFSE

CURI

TYCA

MER

ASSP

ECIA

LTY

SERV

ICES

CIP

CONV

EYOR

INVE

NTOR

YBU

CKET

ELEV

ATOR

BELT

INVE

NTOR

Y

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

JETT

ING

SERV

ICES

BOD

MEE

TING

05/2

7/20

PFC

MEE

TING

05/1

2/20

9-20

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

268

GRAI

NGER

INC

9529

4247

9942

586/

2/20

2035

.20

268

GRAI

NGER

INC

9531

7329

6542

586/

2/20

2014

9.25

268

GRAI

NGER

INC

9537

7850

7442

586/

2/20

2036

6.43

268

GRAI

NGER

INC

9538

1801

4342

586/

2/20

2025

1.76

710

HARO

LDJM

ARTI

NM

ARTI

NBO

D05

/20

4259

6/2/

2020

213.

2171

0HA

ROLD

JMAR

TIN

MAR

TIN

PFC

05/2

042

596/

2/20

2021

3.21

275

HARD

YDI

AGNO

STIC

S23

1302

142

606/

2/20

2085

.49

275

HARD

YDI

AGNO

STIC

S23

1380

042

606/

2/20

2035

.96

298

IDEX

XLA

BORA

TORI

ESIN

C30

6416

5008

4262

6/2/

2020

766.

8429

8ID

EXX

LABO

RATO

RIES

INC

3064

3436

3542

626/

2/20

202,

748.

8912

42JO

SEPH

MIC

HAEL

MOS

CAM

OSCA

PFC

05/2

042

636/

2/20

2021

3.21

1242

JOSE

PHM

ICHA

ELM

OSCA

MOS

CABO

D05

/20

4263

6/2/

2020

213.

2117

23JU

DYRI

TTER

RITT

ERBO

D05

/20

4264

6/2/

2020

213.

2117

23JU

DYRI

TTER

RITT

ERCI

C05

/20

4264

6/2/

2020

213.

2131

9JW

CEN

VIRO

NMEN

TALI

NC.

1021

3742

656/

2/20

2013

,189

.96

1724

KEIT

HBL

ACKB

URN

BLAC

KBUR

NBO

D05

/20

4266

6/2/

2020

213.

2117

24KE

ITH

BLAC

KBUR

NBL

ACKB

URN

CIC

05/2

042

666/

2/20

2021

3.21

1873

SKYH

AWK

INDU

STRI

ESIN

C28

825

4267

6/2/

2020

143.

2523

23M

A LLO

RYSA

FETY

AND

SUPP

LYLL

C48

4580

542

686/

2/20

2011

1.25

299

MAT

HESO

NTR

IGAS

2168

7076

4269

6/2/

2020

620.

2529

9M

ATHE

SON

TRIG

AS21

7055

4242

696/

2/20

2066

9.25

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

3342

1242

706/

2/20

2013

4.29

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

3493

9042

706/

2/20

2033

1.20

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

4038

7142

706/

2/20

2067

8.16

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

4093

3942

706/

2/20

2073

2.14

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

4851

8042

706/

2/20

2023

.98

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

6215

4942

706/

2/20

2020

4.82

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

6786

0742

706/

2/20

2079

4.18

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

6899

8142

706/

2/20

2023

5.53

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

8132

9042

706/

2/20

2095

3.28

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

8255

3942

706/

2/20

2022

9.44

372

MCM

ASTE

RCA

RRSU

PPLY

CO39

8965

4442

706/

2/20

201,

446.

2837

2M

CMAS

TER

CARR

SUPP

LYCO

3996

1686

4270

6/2/

2020

223.

8012

98ON

ESOU

RCE

DIST

RIBU

TORS

LLC

S642

3831

.003

4273

6/2/

2020

3,60

4.50

1298

ONES

OURC

EDI

STRI

BUTO

RSLL

CS6

4378

28.0

0242

736/

2/20

2023

.09

1298

ONES

OURC

EDI

STRI

BUTO

RSLL

CS6

4419

05.0

0142

736/

2/20

201,

394.

7212

98ON

ESOU

RCE

DIST

RIBU

TORS

LLC

S644

7437

.001

4273

6/2/

2020

424.

3312

98ON

ESOU

RCE

DIST

RIBU

TORS

LLC

S645

3344

.001

4273

6/2/

2020

12,2

78.1

045

3PO

LYDY

NEIN

C14

5427

342

746/

2/20

2048

,754

.72

1432

PROC

OPIO

CORY

HARG

REAV

ES&

SAVI

TCH

LLP

7137

7842

756/

2/20

202,

242.

5014

32PR

OCOP

IOCO

RYHA

RGRE

AVES

&SA

VITC

HLL

P71

3779

4275

6/2/

2020

3,43

2.00

1432

PROC

OPIO

CORY

HARG

REAV

ES&

SAVI

TCH

LLP

7137

8042

756/

2/20

207,

466.

5025

13SE

PARA

TION

PROC

ESS,

INC.

9754

4276

6/2/

2020

612.

0015

09TI

MBE

RLIN

EEN

GINE

ERIN

G,IN

C.82

01.0

914

4277

6/2/

2020

8,11

2.50

1509

TIM

BERL

INE

ENGI

NEER

ING,

INC.

8201

.11

0742

776/

2/20

205,

087.

5015

09TI

MBE

RLIN

EEN

GINE

ERIN

G,IN

C.82

01.1

204

4277

6/2/

2020

4,67

5.00

1509

TIM

BERL

INE

ENGI

NEER

ING,

INC.

8201

.13

0442

776/

2/20

2012

,650

.00

2392

UNIV

ARUS

AIN

C48

5845

8042

786/

2/20

201,

704.

6123

92UN

IVAR

USA

INC

4858

4581

4278

6/2/

2020

950.

3623

92UN

IVAR

USA

INC

4858

4582

4278

6/2/

2020

862.

0018

74HD

SUPP

LYFA

CILI

TIES

MAI

NTEN

ANCE

LTD

2386

2242

796/

2/20

2087

5.36

21AI

RGAS

USA

LLC

9101

1303

0018

9074

6/2/

2020

1,85

9.88

2532

ALGA

ESO

LUTI

ONS

2578

9218

9075

6/2/

2020

9,03

7.69

1718

ALLA

NJU

LIUS

SEN

JULI

USSE

NBO

D05

/20

1890

766/

2/20

2021

3.21

1718

ALLA

NJU

LIUS

SEN

JULI

USSE

NCI

C05

/20

1890

766/

2/20

2021

3.21

1718

ALLA

NJU

LIUS

SEN

JULI

USSE

NAG

E04

/20

1890

766/

2/20

2021

3.21

1718

ALLA

NJU

LIUS

SEN

JULI

USSE

NAG

E05

/20

1890

766/

2/20

2021

3.21

951

ANAL

YTIC

ALTE

CHNO

LOGY

INC

4260

2618

9077

6/2/

2020

1,42

2.79

803

APPL

IED

INDU

STRI

ALTE

CHNO

LOGI

ES70

1890

0021

1890

786/

2/20

2051

0.37

925

ARAM

ARK

UNIF

ORM

&CA

REER

APPA

REL

1451

2940

6718

9079

6/2/

2020

435.

8792

5AR

AMAR

KUN

IFOR

M&

CARE

ERAP

PARE

L14

5130

4870

1890

796/

2/20

2055

5.23

925

ARAM

ARK

UNIF

ORM

&CA

REER

APPA

REL

1451

3158

6818

9079

6/2/

2020

448.

4392

5AR

AMAR

KUN

IFOR

M&

C ARE

ERAP

PARE

L14

5132

6585

1890

796/

2/20

2052

0.68

FY20

20UN

IFOR

MRE

NTAL

AND

CLEA

NING

FY20

20UN

IFOR

MRE

NTAL

AND

CLEA

NING

FY20

20UN

IFOR

MRE

NTAL

AND

CLEA

NING

AGEN

DARE

VIEW

04/2

1/20

AGEN

DARE

VIEW

05/2

6/20

MIN

ORRE

HABI

LITA

TION

CWRF

CHLO

RINE

MET

ERPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

FY20

20UN

IFOR

MRE

NTAL

AND

CLEA

NING

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESSA

FETY

EQUI

PMEN

TPR

OTEC

TIVE

CLOT

HING

CIP

IDCA

RDPR

INTE

RBO

DM

EETI

NG05

/27/

20CI

CM

EETI

NG05

/20/

20

TASK

ORDE

RNO

.12

DIGE

STER

IMPR

OVEM

ENT

FINA

LDES

IGN

TASK

ORDE

RNO

.13

NETW

ORK

IMPR

OVEM

ENTS

PHAS

E1

PROJ

ECT

CHEM

ICAL

SCI

TRIC

ACID

FOR

CWRF

CHEM

ICAL

SCA

USTI

CFO

RCW

RFCH

EMIC

ALS

SODI

UMBI

SULF

ATE

FOR

CWRF

LEGA

LSER

VICE

SLE

GALS

ERVI

CES

CWRF

RECY

CLE

WAT

ERST

ORAG

EBA

SIN

TASK

ORDE

RNO

.9PR

IMAR

IES

ELEC

TRIC

ALEN

GINE

ERIN

GAN

DSC

ADA

SUPP

ORT

TASK

ORDE

RNO

.11

FY20

20AS

NEED

EDEN

GINE

ERIN

GSE

RVIC

ES

DRYE

RBL

DLI

GHTI

NGRE

PLAC

EM

CCBU

CKET

TIM

ERPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

MIN

ORRE

HABI

LITA

TION

SYST

EMS

FY20

20SL

UDGE

DEW

ATER

ING

POLY

MER

LEGA

LSER

VICE

S

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

TURB

OCO

OLAN

TLI

NES

SAFE

TYSU

PPLI

ESCI

PDR

YER

CORR

ECTI

VEM

AINT

ENAN

CEPI

PING

&EL

ECTR

ICAL

REPA

IR

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESPL

ANNE

DM

AINT

ENAN

CECW

RFUF

SYST

EMCO

GEN

SUPP

LIES

PLAN

NED

MAI

NTEN

ANCE

CWRF

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESTR

ANSF

ERHO

SEFO

RFO

G

FY20

20LI

QUI

DNI

TROG

ENPI

PING

AND

ELEC

TRIC

ALRE

PAIR

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESHO

SE

BOD

MEE

TING

05/2

7/20

CIC

MEE

TING

05/2

0/20

PFC

AGEN

DADE

LIVE

RIES

SAFE

TYEQ

UIPM

ENT

FY20

20LI

QUI

DNI

TROG

EN

PFC

MEE

TING

05/1

2/20

BOD

MEE

TING

05/2

7/20

BOD

MEE

TING

05/2

7/20

CIC

MEE

TING

05/2

0/20

INVE

NTOR

YPR

IMAR

YGR

INDE

R&

REDU

CER

PFC

MEE

TING

05/1

2/20

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

COLI

LERT

REAG

ENT

SAFE

TYEQ

UIPM

ENT

SPEC

IALT

YEQ

UIPM

ENT

SAFE

TYEQ

UIPM

ENT

JANI

TORI

ALSU

PPLI

ESBO

DM

EETI

NG05

/27/

20

9-21

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

2056

ARIZ

ONA

DEPA

RTM

ENT

OFAG

RICU

LTUR

EFY

2067

6218

9080

6/2/

2020

175.

0047

ASBU

RYEN

VIRO

NMEN

TALS

ERVI

CES

I500

0056

0589

1890

816/

2/20

2022

7.80

107

CALT

ROLI

NCCD

9910

3133

1890

826/

2/20

2046

2.24

112

CITY

OFCA

RLSB

AD05

0026

0000

04/2

018

9083

6/2/

2020

987.

5311

2CI

TYOF

CARL

SBAD

0111

8100

0004

/20

1890

836/

2/20

2064

.87

1459

SUNB

ELT

RENT

ALS

INC

1012

4527

900

0118

9084

6/2/

2020

737.

3015

14DE

NALI

WAT

ERSO

LUTI

ONS

LLC

0027

059

IN18

9085

6/2/

2020

5,08

4.61

1514

DENA

LIW

ATER

SOLU

TION

SLL

C00

2706

0IN

1890

856/

2/20

208,

514.

0115

14DE

NALI

WAT

ERSO

LUTI

ONS

LLC

0027

061

IN18

9085

6/2/

2020

1,26

9.99

1955

DFK

SOLU

TION

SGR

OUP

LLC

1513

318

9086

6/2/

2020

2,25

0.00

1882

DIRE

CTV

3745

3080

123

1890

876/

2/20

2010

3.99

229

FEDE

RALE

XPRE

SSCO

RP7

012

3841

418

9088

6/2/

2020

149.

1325

1FR

ONTI

ERFE

NCE

CORP

0596

4018

9089

6/2/

2020

1,50

0.00

283

HOM

EDE

POT

CRED

ITSE

RVIC

ES31

7041

818

9090

6/2/

2020

54.0

428

3HO

ME

DEPO

TCR

EDIT

SERV

ICES

6170

372

1890

906/

2/20

2054

.83

2028

JIMHE

RNAN

DEZ

HERN

ANDE

ZCI

C05

/20

1890

916/

2/20

2021

3.21

2028

JIMHE

RNAN

DEZ

HERN

ANDE

ZBO

D05

/20

1890

916/

2/20

2021

3.21

1924

JOHN

FETU

FETU

REIM

B05

/20

1890

926/

2/20

2043

7.87

234

JRFI

LANC

CONS

TRUC

TION

COM

PANY

INC

505

/20

1890

936/

2/20

2068

,287

.32

325

KENN

EDY

JENK

SCO

NSUL

TING

1380

3518

9094

6/2/

2020

37,3

10.5

832

5KE

NNED

YJE

NKS

CONS

ULTI

NG13

8643

1890

946/

2/20

2053

,093

.89

325

KENN

EDY

JENK

SCO

NSUL

TING

1386

4418

9094

6/2/

2020

9,11

1.00

325

KENN

EDY

JENK

SCO

NSUL

TING

1386

4518

9094

6/2/

2020

20,9

27.8

032

5KE

NNED

YJE

NKS

CONS

ULTI

NG13

8728

1890

946/

2/20

208,

146.

2514

45LO

WVO

LTAG

EIN

TEGR

ATED

SYST

EMS

3769

718

9096

6/2/

2020

210.

0070

6M

AGSY

STEM

SIN

C24

017

6031

1890

976/

2/20

2021

4.40

706

MAG

SYST

EMS

INC

2403

260

3318

9097

6/2/

2020

171.

3012

82M

ICRO

MOT

ION

INC

4059

0534

1890

996/

2/20

202,

542.

2616

30M

INE

SAFE

TYAP

PLIA

NCES

COM

PANY

9610

5216

118

9100

6/2/

2020

707.

8625

18M

OUSE

REL

ECTR

ONIC

S,IN

C.56

7346

1618

9101

6/2/

2020

807.

2323

63NA

UMAN

NHO

BBS

MAT

ERIA

LHAN

DLIN

GFS

6011

1884

1891

026/

2/20

2051

8.40

417

OFFI

CEDE

POT

INC

4903

8036

3001

1891

036/

2/20

2055

2.62

417

OFFI

CEDE

POT

INC

4903

8072

3001

1891

036/

2/20

2024

.13

417

OFFI

CEDE

POT

INC

4916

9173

9001

1891

036/

2/20

2021

8.81

417

OFFI

CEDE

POT

INC

4916

9234

5001

1891

036/

2/20

2034

.47

2075

OLIN

CORP

ORAT

ION

2825

519

1891

046/

2/20

203,

904.

0820

75OL

INCO

RPOR

ATIO

N28

2759

618

9104

6/2/

2020

3,85

5.98

2075

OLIN

CORP

ORAT

ION

2828

623

1891

046/

2/20

203,

678.

0120

75OL

INCO

RPOR

ATIO

N28

3027

118

9104

6/2/

2020

3,92

4.92

2075

OLIN

CORP

ORAT

ION

2832

200

1891

046/

2/20

203,

965.

0123

78Q

UALI

TYSE

CURI

TYSE

RVIC

ES54

334

1891

056/

2/20

2054

6.44

1818

ROCK

WEL

LENG

INEE

RING

&EQ

UIPM

ENT

1889

518

9106

6/2/

2020

25,9

87.6

214

07JO

ESA

LLAY

SALL

AYED

REIM

4/20

418

9107

6/2/

2020

70.0

060

5SA

NDI

EGO

GAS

&EL

ECTR

IC95

7505

/20

1891

086/

2/20

2094

,243

.21

605

SAN

DIEG

OGA

S&

ELEC

TRIC

6192

05/2

018

9108

6/2/

2020

624.

6860

5SA

NDI

EGO

GAS

&EL

ECTR

IC46

1605

/20

1891

086/

2/20

207,

574.

7660

5SA

NDI

EGO

GAS

&EL

ECTR

IC87

4705

/20

1891

086/

2/20

209,

554.

3360

5SA

NDI

EGO

GAS

&EL

ECTR

IC20

5505

/20

1891

086/

2/20

2011

.84

605

SAN

DIEG

OGA

S&

ELEC

TRIC

2781

05/2

018

9108

6/2/

2020

31,3

66.3

260

5SA

NDI

EGO

GAS

&EL

ECTR

IC13

1905

/20

1891

086/

2/20

203,

052.

0619

29SI

EMEN

SIN

DUST

RIES

5604

3661

5918

9109

6/2/

2020

6,51

0.26

1929

SIEM

ENS

INDU

STRI

ES56

0436

8064

1891

096/

2/20

2010

,783

.62

1849

SOUT

HERN

COUN

TIES

LUBR

ICAN

TS,L

LC82

0572

1891

106/

2/20

204,

284.

1452

1SW

RCB

DZW

IGAL

SKIG

R120

1891

116/

2/20

2015

0.00

521

SWRC

BJO

HNSO

NGR

II20

1891

116/

2/20

2015

0.00

184

TEST

AMER

ICA

LABO

RATO

RIES

INC

4400

0393

5518

9112

6/2/

2020

27.5

055

9VA

LIN

CORP

ORAT

ION

3434

267

1891

146/

2/20

201,

242.

2520

50VE

RIZO

NW

IREL

ESS

9854

3144

0718

9115

6/2/

2020

125.

1022

37W

ILLI

AMSV

ECSV

ECRE

IMB

05/2

018

9116

6/2/

2020

86.1

5$9

47,2

67.9

315

30CA

LPER

SHE

ALTH

1000

0001

6044

812

4240

6/2/

2020

83,4

96.8

017

16IC

MA

#303

941

5076

642

616/

2/20

2030

.20

1716

ICM

A#3

0394

150

767

4261

6/2/

2020

32,1

44.0

9Pa

yrol

lRun

2W

arra

nt06

0320

Payr

ollR

un1

War

rant

0603

20

CWRF

MIN

ORRE

HABI

LITA

TION

TRAI

NAI

RCO

RDRE

PAIR

SFY

2020

TELE

PHON

EW

IREL

ESS

LAB

SUPP

LIES

HEAL

THIN

SURA

NCE

PREM

IUM

SJU

NE

FUEL

AND

LUBE

ENGI

NEOI

LCE

RTIF

ICAT

ION

CERT

IFIC

ATIO

NOU

TSID

ELA

BAN

ALYS

ISEW

AEF

FLUE

NT

ELEC

TRIC

ITY

AHPS

ELEC

TRIC

ITY

BVPS

ELEC

TRIC

ITY

AHPS

CIP

BUBB

LER

REPL

ACEM

ENT

SECO

NDAR

YSC

UMPI

TCI

PBU

BBLE

RRE

PLAC

EMEN

TSE

COND

ARY

SCUM

PIT

TUIT

ION

REIM

BURS

EMEN

TEL

ECTR

ICIT

YEW

PCF

ELEC

TRIC

ITY

CWRF

ELEC

TRIC

ITY

CWRF

ELEC

TRIC

ITY

AHPS

FY20

20SO

DIUM

HYPO

CHLO

RITE

FY20

20SO

DIUM

HYPO

CHLO

RITE

FY20

20SO

DIUM

HYPO

CHLO

RITE

SPEC

IALT

YSE

RVIC

ESPR

IMAR

IES

REPL

ACE

PRIM

ARY

SLUD

GEPU

MP

MIS

CELL

ANEO

USOF

FICE

SUPP

LIES

MIS

CELL

ANEO

USOF

FICE

SUPP

LIES

MIS

CELL

ANEO

USOF

FICE

SUPP

LIES

FY20

20SO

DIUM

HYPO

CHLO

RITE

FY20

20SO

DIUM

HYPO

CHLO

RITE

CIP

2WFL

OWCO

NTRO

LVAL

VERE

PLAC

EMEN

TPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

INFO

RMAT

ION

SYST

EMS

HARD

WAR

EM

OBIL

EEQ

UIPM

ENT

REPA

IRSC

ISSO

RLI

FTRE

PAIR

MIS

CELL

ANEO

USOF

FICE

SUPP

LIES

TASK

ORDE

RNO

.4NE

TWOR

KIM

PROV

EMEN

TSPH

ASE

1PR

OJEC

TCM

SFY

2021

RCA

MP

UPDA

TESP

ECIA

LTY

SERV

ICES

SAFE

TYSU

PPLI

ESSA

FETY

SUPP

LIES

JANI

TORI

ALSU

PPLI

ESTA

SKOR

DER

NO.1

COGE

NST

RUCT

URAL

REPA

IRSH

ORIN

GSY

STEM

INST

ALLA

TION

FY20

21R

CAM

PUP

DATE

TASK

ORDE

RNO

.1PR

IMAR

YAR

EAIM

PROV

EMEN

TSCM

STA

SKOR

DER

NO.3

DIGE

STER

CLEA

NING

&CO

ATIN

GPR

OJEC

TCM

S

SPEC

IALT

YSE

RVIC

ESPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESCI

CM

EETI

NG05

/20/

20BO

DM

EETI

NG05

/27/

20

FY20

20BI

OSOL

IDS

HAUL

ING

AND

HAND

LING

SERV

ICES

FY20

20BI

OSOL

IDS

HAUL

ING

AND

HAND

LING

SERV

ICES

SAFE

TYCO

VID

19EX

POSU

RECO

NTRO

LPLA

NFY

2020

DIRE

CTV

SERV

ICES

EFFL

UENT

TEST

ING

PIPI

NGAN

DEL

ECTR

ICAL

REPA

IRFY

2020

POTA

BLE

WAT

ERFY

2020

POTA

BLE

WAT

EREQ

UIPM

ENT

RENT

ALFY

2020

BIOS

OLID

SHA

ULIN

GAN

DHA

NDLI

NGSE

RVIC

ES

PERM

ITS

SPEC

IALT

YSE

RVIC

ES

9-22

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

1716

ICM

A#3

0394

150

770

4261

6/2/

2020

10,9

10.7

323

07M

UTUA

LOF

OMAH

A00

1080

1748

9642

716/

2/20

207,

787.

8723

07M

UTUA

LOF

OMAH

A00

1088

0839

2942

716/

2/20

207,

787.

8717

17NA

TION

WID

E#0

0409

9900

150

768

4272

6/2/

2020

3,88

2.61

2276

LEGA

LSHI

ELD

0147

531

05/2

018

9095

6/2/

2020

33.9

021

02M

ESVI

SION

2012

9295

0501

1890

986/

2/20

2089

2.17

2131

UNIT

EDCO

NCOR

DIA

DENT

ALPL

ANS

OFCA

1550

0132

818

9113

6/2/

2020

4,93

8.40

$151

,904

.64

13AD

SEN

VIRO

NMEN

TALS

ERVI

CES

2209

1.22

0520

4280

6/17

/202

010

,788

.71

411

AJIL

ON11

3601

6742

816/

17/2

020

998.

4022

14AM

ANDA

YOUN

GRI

GBY

RIGB

YPF

C06

/20

4282

6/17

/202

021

3.21

2254

AMER

ICAN

SECU

RITY

GROU

P26

734

4283

6/17

/202

03,

394.

4822

54AM

ERIC

ANSE

CURI

TYGR

OUP

2673

542

836/

17/2

020

3,49

4.48

2254

AMER

ICAN

SECU

RITY

GROU

P26

737

4283

6/17

/202

02,

778.

8717

59AM

ETEK

ARIZ

ONA

INST

RUM

ENT,

LLC

A000

0035

3594

4284

6/17

/202

049

5.65

2436

AZTE

CLE

ASIN

G,IN

CIN

1689

642

856/

17/2

020

937.

0910

06BA

KER

ELEC

TRIC

,INC

2054

742

866/

17/2

020

15,5

06.2

891

BROW

N&

CALD

WEL

L44

3731

6642

876/

17/2

020

27,9

93.5

013

64CA

LIFO

RNIA

WAT

ERTE

CHNO

LOGI

ES37

572

4288

6/17

/202

06,

535.

4613

64CA

LIFO

RNIA

WAT

ERTE

CHNO

LOGI

ES37

519

4288

6/17

/202

06,

276.

5317

96CA

R OLL

OEN

GINE

ERS,

INC.

0187

160

4289

6/17

/202

049

,806

.60

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8770

242

896/

17/2

020

2,17

0.00

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8770

342

896/

17/2

020

30,3

20.0

023

11CD

MSM

ITH

9010

0788

4290

6/17

/202

012

,680

.00

2311

CDM

SMIT

H90

0991

7742

916/

17/2

020

29,3

62.8

814

40CD

WGO

VERN

MEN

TXW

S629

742

926/

17/2

020

3,64

4.35

1440

CDW

GOVE

RNM

ENT

XXC9

162

4292

6/17

/202

07,

135.

7814

40CD

WGO

VERN

MEN

TXX

D206

942

926/

17/2

020

237.

2414

40CD

WGO

VERN

MEN

TXZ

H186

842

926/

17/2

020

4,54

4.45

1440

CDW

GOVE

RNM

ENT

XZK9

517

4292

6/17

/202

01,

073.

4314

40CD

WGO

VERN

MEN

TXZ

L308

042

926/

17/2

020

1,76

8.92

1440

CDW

GOVE

RNM

ENT

XZL5

950

4292

6/17

/202

032

9.86

1440

CDW

GOVE

RNM

ENT

XZR6

387

4292

6/17

/202

069

5.00

1440

CDW

GOVE

RNM

ENT

XZS0

073

4292

6/17

/202

02,

260.

6714

40CD

WGO

VERN

MEN

TXZ

S117

842

926/

17/2

020

342.

6314

40CD

WGO

VERN

MEN

TXZ

S118

642

926/

17/2

020

1,01

9.76

1440

CDW

GOVE

RNM

ENT

XZZ3

225

4292

6/17

/202

02,

427.

5814

40CD

WGO

VERN

MEN

TZB

G430

442

926/

17/2

020

91.3

514

40CD

WGO

VERN

MEN

TZB

H194

842

926/

17/2

020

309.

9214

40CD

WGO

VERN

MEN

TZB

N519

542

926/

17/2

020

4,48

1.82

1440

CDW

GOVE

RNM

ENT

ZBT8

429

4292

6/17

/202

057

5.49

1440

CDW

GOVE

RNM

ENT

ZBV7

579

4292

6/17

/202

02,

427.

5814

40CD

WGO

VERN

MEN

TZC

B626

842

926/

17/2

020

487.

9414

40CD

WGO

VERN

MEN

TXW

C429

042

926/

17/2

020

9,45

3.24

1440

CDW

GOVE

RNM

ENT

ZCL6

670

4292

6/17

/202

089

7.67

1440

CDW

GOVE

RNM

ENT

XTZ6

325

4292

6/17

/202

026

4.80

1440

CDW

GOVE

RNM

ENT

WZH

9228

4292

6/17

/202

059

.64

1440

CDW

GOVE

RNM

ENT

XDB2

085

4292

6/17

/202

093

9.38

1440

CDW

GOVE

RNM

ENT

XHC5

284

4292

6/17

/202

01,

419.

9614

40CD

WGO

VERN

MEN

TXM

R455

842

926/

17/2

020

910.

9724

86CO

RINN

ESC

H UM

ACHE

RSC

HUM

ACHE

RPF

C06

/20

4294

6/17

/202

021

3.21

1850

COX

COM

MUN

ICAT

IONS

INC

0113

1101

1377

6701

0620

4295

6/17

/202

01,

550.

0017

22EL

AINE

SULL

IVAN

SULL

IVAN

PFC

06/2

042

966/

17/2

020

213.

2123

58EN

TERP

RISE

AUTO

MAT

ION

7910

4297

6/17

/202

02,

877.

5023

58EN

TERP

RISE

AUTO

MAT

ION

7911

4297

6/17

/202

04,

557.

5023

58EN

TERP

RISE

AUTO

MAT

ION

7912

4297

6/17

/202

02,

981.

2523

58EN

TERP

RISE

AUTO

MAT

ION

7913

4297

6/17

/202

08,

480.

0023

58EN

TERP

RISE

AUTO

MAT

ION

7931

4297

6/17

/202

032

,682

.30

1430

ENTE

RPRI

SEIN

DUST

RIAL

SUPP

LYIN

C66

529

4298

6/17

/202

01,

549.

7114

30EN

TERP

RISE

INDU

STRI

ALSU

PPLY

INC

6664

442

986/

17/2

020

419.

2610

11EN

VIRO

NMEN

TALE

XPRE

SS10

0060

2784

4299

6/17

/202

032

2.77

1011

ENVI

RONM

ENTA

LEXP

RESS

1000

6035

3742

996/

17/2

020

273.

9610

11EN

VIRO

NMEN

TALE

XPRE

SS10

0060

3673

4299

6/17

/202

043

1.82

DAF

REPL

ACE

HOSE

SLA

BSU

PPLI

ESLA

BSU

PPLI

ESLA

BSU

PPLI

ES

TASK

ORDE

RNO

.18

FY20

20IN

TEGR

ATIO

NSE

RVIC

ESAN

NUAL

STA

SKOR

DER

NO.2

1SO

LIDS

THIC

KENI

NGPR

IMAR

YDE

SIGN

S UPP

ORT

TASK

ORDE

RNO

.23

SCAD

ASY

STEM

INTE

GRAT

ION

SERV

ICES

&HA

RDW

ARE

PROC

UREM

ENT

TASK

ORDE

RNO

.14

PRIM

ARIE

SSC

ADA

INTE

GRAT

ION

AND

PROG

RAM

MIN

GSE

RVIC

ESPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

DRUM

MOB

ILE

OIL

INFO

RMAT

ION

SYST

EMS

UPS

SMAR

TAP

PPF

CM

EETI

NG06

/09/

20FY

2020

INTE

RNET

SERV

ICE

PFC

MEE

TING

06/0

9/20

TASK

ORDE

RNO

.22

INTE

GRAT

ION

DESI

GNSE

RVIC

ESFO

RTH

EDI

GEST

ER

INFO

RMAT

ION

SYST

EMS

INFO

RMAT

ION

SYST

EMS

SOFT

WAR

EIN

FORM

ATIO

NSY

STEM

SHA

RDW

ARE

INFO

RMAT

ION

SYST

EMS

OPS

CONT

ROLP

RINT

ERIN

FORM

ATIO

NSY

STEM

SSO

FTW

ARE

AUTO

DESK

FUSI

ON

PLAN

TW

IDE

DOOR

CAM

ERA

MON

ITOR

SCI

PBO

ARD

ROOM

REHA

BILI

TATI

ONRB

PSM

INOR

REHA

BILI

TATI

ONUP

GRAD

EDO

ORSE

CURI

TYIN

FORM

ATIO

NSY

STEM

SSO

FTW

ARE

CIP

PLAN

TSE

CURI

TYCA

MER

ASSE

RVER

S

PLAN

TW

IDE

DOOR

CAM

ERA

MON

ITOR

SIN

FORM

ATIO

NSY

STEM

SSO

FTW

ARE

RBPS

MIN

ORRE

HABI

LITA

TION

UPGR

ADE

DOOR

SECU

RITY

RBPS

MI N

ORRE

HABI

LITA

TION

UPGR

ADE

DOOR

SECU

RITY

INFO

RMAT

ION

SYST

EMS

SOFT

WAR

E

INFO

RMAT

ION

SYST

EMS

CWRF

MON

ITOR

SIN

FORM

ATIO

NSY

STEM

SSO

FTW

ARE

COM

PUTE

RRE

PLAC

EMEN

TCI

PBO

ARD

ROOM

REHA

BILI

TATI

ONIN

FORM

ATIO

NSY

STEM

SSO

FTW

ARE

CISC

ONE

TWOR

KLI

CENS

ECI

PBO

ARD

ROOM

REHA

BILI

TATI

ON

DESI

GNBU

ILD

DOCU

MEN

TSFO

RSC

ADA

NETW

ORK

DESI

GNPR

OJEC

TIN

FORM

ATIO

NSY

STEM

SSO

FTW

ARE

SOFT

WAR

ERE

NEW

ALCI

PPL

ANT

SECU

RITY

CAM

ERAS

SERV

ERS

INFO

RMAT

ION

SYST

EMS

CIP

PLAN

TSE

CURI

TYCA

MER

ASSE

RVER

S

F Y20

20FE

RRIC

CHLO

RIDE

SOLI

DSTH

ICKE

NING

DESI

GNPR

OJEC

TEQ

UALI

ZATI

ONBA

SIN

SETT

LEM

ENT

EQUA

LIZA

TION

BASI

NSE

TTLE

MEN

TSC

ADA

NETW

ORK

INFR

ASTR

UCTU

REIM

PROV

EMEN

TSPR

OJEC

TPH

ASE

1ES

DC

SPEC

IALT

YSE

RVIC

ESSH

ARP

COPI

ERS

LEAS

ENE

MAP

PLIC

ATIO

NPR

OJEC

TDI

GEST

ERRE

HABI

LITA

TION

AND

IMPR

OVEM

ENTS

PROJ

ECT

FY20

20FE

RRIC

CHLO

RIDE

TEM

PORA

RYLA

BOR

RECE

PTIO

NIST

PFC

MEE

TING

06/0

9/20

BVPS

MIN

ORRE

HABI

LITA

TON

INST

ALLA

TION

OFSE

CURI

TYCA

MER

ASAH

PSM

INOR

REHA

BILI

TATO

NIN

STAL

LATI

ONOF

SECU

RITY

CAM

ERAS

INFO

RMAT

ION

SYST

EMS

NETW

ORK

CAM

ERA

Payr

ollR

un1

War

rant

0603

20LE

GALS

ERVI

CES

VISI

ONIN

SURA

NCE

PREM

IUM

SM

AY

ADS

FLOW

MET

ERIN

GSE

RVIC

ES

Payr

ollR

un2

War

rant

0527

20LI

FEIN

SURA

NCE

PREM

IUM

LIFE

INSU

RANC

EPR

EMIU

M

DENT

ALPR

EMIU

MJU

NE

9-23

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

219

ENVI

RONM

ENTA

LRES

OURC

EAS

SOCI

ATES

9393

7943

006/

17/2

020

207.

2521

9EN

VIRO

NMEN

TALR

ESOU

RCE

ASSO

CIAT

ES93

9457

4300

6/17

/202

065

3.96

2058

EVAN

TEC

CORP

ORAT

ION

2020

1775

4301

6/17

/202

068

1.67

2058

EVAN

TEC

CORP

ORAT

ION

2020

1969

4301

6/17

/202

017

6.23

240

FISH

ERSC

IENT

IFIC

0310

393

4302

6/17

/202

01,

585.

7924

0FI

SHER

SCIE

NTIF

IC04

2398

443

026/

17/2

020

49.6

724

0FI

SHER

SCIE

NTIF

IC01

1491

343

026/

17/2

020

848.

4524

0FI

SHER

SCIE

NTIF

IC01

9622

743

026/

17/2

020

14.4

024

0FI

SHER

SCIE

NTIF

IC00

4354

343

026/

17/2

020

39.9

724

0FI

SHER

SCIE

NTIF

IC94

1006

443

026/

17/2

020

139.

3824

0FI

SHER

SCIE

NTIF

IC94

6424

843

026/

17/2

020

229.

1024

0FI

SHER

SCIE

NTIF

IC95

1588

243

026/

17/2

020

1,78

3.57

240

FISH

ERSC

IENT

IFIC

9515

883

4302

6/17

/202

070

9.43

240

FISH

ERSC

IENT

IFIC

9303

273

4302

6/17

/202

017

8.60

240

FISH

ERSC

IENT

IFIC

9688

083

4302

6/17

/202

049

.67

240

FISH

ERSC

IENT

IFIC

9688

084

4302

6/17

/202

051

8.67

240

FISH

ERSC

IENT

IFIC

9688

086

4302

6/17

/202

037

9.80

240

FISH

ERSC

IENT

IFIC

9569

322

4302

6/17

/202

020

7.13

240

FISH

ERSC

IENT

IFIC

9569

323

4302

6/17

/202

025

8.60

240

FISH

ERSC

IENT

IFIC

9569

329

4302

6/17

/202

060

0.00

240

FISH

ERSC

IENT

IFIC

9961

793

4302

6/17

/202

014

3.96

240

FISH

ERSC

IENT

IFIC

9961

797

4302

6/17

/202

095

8.60

268

GRAI

NGER

INC

9546

1219

2343

036/

17/2

020

119.

5726

8GR

AING

ERIN

C95

3903

4992

4303

6/17

/202

016

8.09

268

GRAI

NGER

INC

9540

6534

0043

036/

17/2

020

23.0

426

8GR

AING

ERIN

C95

4117

3713

4303

6/17

/202

030

1.98

268

GRAI

NGER

INC

9545

5270

9643

036/

17/2

020

173.

1627

3HA

CHCO

MPA

NY11

9677

5543

046/

17/2

020

1,20

1.31

273

HACH

COM

PANY

1197

0176

4304

6/17

/202

028

8.55

273

HACH

COM

PANY

1197

1308

4304

6/17

/202

038

8.33

273

HACH

COM

PANY

1197

3726

4304

6/17

/202

070

3.46

273

HACH

COM

PANY

1197

5140

4304

6/17

/202

033

4.40

273

HACH

COM

P ANY

1197

5999

4304

6/17

/202

03,

200.

2227

3HA

CHCO

MPA

NY11

9781

2043

046/

17/2

020

313.

7971

0HA

ROLD

JMAR

TIN

MAR

TIN

PFC

06/2

043

056/

17/2

020

213.

2113

80HA

WTH

ORNE

POW

ERSY

STEM

SSS

1100

1203

3043

066/

17/2

020

351,

978.

8112

42JO

SEPH

MIC

HAEL

MOS

CAM

OSCA

PFC

06/2

043

096/

17/2

020

213.

2132

0KA

MAN

INDU

STRI

ALTE

CHCO

RPD4

5878

043

106/

17/2

020

411.

3429

9M

ATHE

SON

TRIG

AS21

7956

6643

116/

17/2

020

1,01

4.35

372

MCM

ASTE

RCA

RRSU

PPLY

CO40

5276

1543

126/

17/2

020

182.

4837

2M

CMAS

TER

CARR

SUPP

LYCO

4010

9981

4312

6/17

/202

010

1.57

372

MCM

ASTE

RCA

RRSU

PPLY

CO40

3255

3743

126/

17/2

020

2,18

8.79

1699

MIN

UTEM

ANPR

ESS

5627

843

136/

17/2

020

317.

8622

48M

WM

ECHA

NICA

LINC

1057

7522

4314

6/17

/202

02,

804.

0022

48M

WM

ECHA

NICA

LINC

1057

7590

4314

6/17

/202

033

8.02

2512

NEXI

NITE

LLC

INV

0004

6343

166/

17/2

020

19,2

75.0

012

98ON

ESOU

RCE

DIST

RIBU

TORS

LLC

S644

7732

.001

4317

6/17

/202

077

1.17

1298

ONES

OURC

EDI

STRI

BUTO

RSLL

CS6

4533

42.0

0143

176/

17/2

020

36,8

31.1

112

98ON

ESOU

RCE

DIST

RIBU

TORS

LLC

S645

3344

.002

4317

6/17

/202

03,

067.

2312

98ON

ESOU

RCE

DIST

RIBU

TORS

LLC

S645

4025

.001

4317

6/17

/202

026

3.29

2183

PAYN

EPE

STM

ANAG

EMEN

T23

1329

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

1378

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

0763

4318

6/17

/202

060

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

1115

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

1963

4318

6/17

/202

060

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

2127

4318

6/17

/202

017

9.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

2128

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

3230

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

3293

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

3349

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

3587

4318

6/17

/202

075

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

3949

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

4081

4318

6/17

/202

060

.00

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SEW

A

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SEW

AFY

2020

PEST

CONT

ROLS

ERVI

CES

EWA

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESRA

DIO

BATT

ERIE

SBV

PSM

INOR

REHA

BILI

TATI

ONLO

GIPR

OCES

SM

ODUL

EM

INOR

REHA

BILI

TATI

ONSY

STEM

SPI

PING

ELEC

TRIC

ALRE

PAIR

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

PLAN

NED

MAI

NTEN

ANCE

COGE

NERA

TION

SUPP

LIES

PRIN

TING

AND

REPR

ODUC

TION

SPEC

IALT

YSE

RVIC

ESSP

ECIA

LTY

SERV

ICES

DOCU

MEN

TM

ANAG

EMEN

TSE

RVIC

ES

PFC

MEE

TING

06/0

9/20

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESFY

2020

LIQ

UID

NITR

OGEN

SAFE

TYSU

PPLI

ESJA

NITO

RIAL

SUPP

LIES

LAB

SUPP

LIES

MIN

ORRE

HABI

LITA

TION

SEEP

SFL

OWM

ETER

REPL

ACEM

ENT

LAB

S UPP

LIES

PFC

MEE

TING

06/0

9/20

MAJ

OROV

ERHA

ULPR

OJEC

TFO

REN

GINE

NO.2

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESLA

BSU

PPLI

ESLA

BSU

PPLI

ESLA

BSU

PPLI

ESLA

BEQ

UIPM

ENT

REPA

IRTU

BING

BOD

SENS

OR

LAB

SUPP

LIES

SAFE

TYEQ

UIPM

ENT

PLAN

NED

MAI

NTEN

ANCE

SAFE

TYSU

PPLI

ESSA

FETY

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

9-24

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

2183

PAYN

EPE

STM

ANAG

EMEN

T23

4169

4318

6/17

/202

017

9.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

4546

4318

6/17

/202

060

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

5800

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

6030

4318

6/17

/202

017

9.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

6467

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

6607

4318

6/17

/202

060

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

6906

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

6972

4318

6/17

/202

035

.00

2183

PAYN

EPE

STM

ANAG

EMEN

T23

6985

4318

6/17

/202

060

.00

453

POLY

DYNE

INC

1459

783

4319

6/17

/202

011

,746

.91

1432

PROC

OPIO

CORY

HARG

REAV

ES&

SAVI

TCH

LLP

7171

8943

206/

17/2

020

16,3

86.8

514

32PR

OCOP

IOCO

RYHA

RGRE

AVES

&SA

VITC

HLL

P71

7190

4320

6/17

/202

05,

175.

0014

32PR

OCOP

IOCO

RYHA

RGRE

AVES

&SA

VITC

HLL

P71

7191

4320

6/17

/202

01,

552.

5014

32PR

OCOP

IOCO

RYHA

RGRE

AVES

&SA

VITC

HLL

P71

3777

4320

6/17

/202

022

,218

.00

1835

PURE

TEC

INDU

STRI

ALW

ATER

1801

811

4321

6/17

/202

040

2.12

1835

PURE

TEC

INDU

STRI

ALW

ATER

1804

528

4321

6/17

/202

025

6.71

1835

PURE

TEC

INDU

STRI

ALW

ATER

1804

529

4321

6/17

/202

071

.01

2513

SEPA

RATI

ONPR

OCES

S,IN

C.97

8443

226/

17/2

020

272.

0024

25SH

ARP

ELEC

TRON

ICS

CORP

ORAT

ION

9002

7822

5443

236/

17/2

020

125.

4850

9SK

CW

EST

INC

0332

257A

IN43

246/

17/2

020

846.

44LA

BSU

PPLI

ES20

91SI

GNAL

HILL

AUTO

ENTE

RPRI

SES

1310

3843

256/

17/2

020

646.

4154

6TR

IDEN

TTE

CHNO

LOGI

ESIN

C29

8115

743

266/

17/2

020

1,23

8.38

2392

UNIV

ARUS

AIN

C48

6060

9743

276/

17/2

020

950.

3623

92UN

IVAR

USA

INC

4860

6098

4327

6/17

/202

086

2.00

1551

WES

TAIR

GASE

S&

EQUI

PMEN

TIN

C80

3114

9343

286/

17/2

020

105.

0915

51W

ESTA

IRGA

SES

&EQ

UIPM

ENT

INC

4103

043

286/

17/2

020

(98.

95)

1865

WOO

DARD

&CU

RRAN

INC

1764

2143

296/

17/2

020

2,93

5.50

1865

WOO

DARD

&CU

RRAN

INC

1765

7043

296/

17/2

020

42,9

57.2

518

65W

OODA

RD&

CURR

ANIN

C17

6626

4329

6/17

/202

07,

414.

2518

65W

OODA

RD&

CURR

ANIN

C17

6631

4329

6/17

/202

02,

889.

2525

38W

ESTE

RNEL

ECTR

ICIT

YCO

ORDI

NATI

NGCO

UNCI

LCI

POLL

INIR

EG06

/20

4330

6/17

/202

010

0.00

21AI

RGAS

USA

LLC

9101

2616

8518

9117

6/17

/202

01,

324.

7695

1AN

ALYT

ICAL

TECH

NOLO

GYIN

C42

6689

1891

186/

17/2

020

1,49

5.49

1622

ANIX

TER

INC

18K4

4093

618

9119

6/17

/202

01,

065.

5744

AQUA

TIC

BIOA

SSAY

&CO

NSUL

TING

LAB

INC

ENC0

520.

0425

1891

206/

17/2

020

945.

0047

ASBU

RYEN

VIRO

NMEN

TALS

ERVI

CES

I500

0056

5934

1891

216/

17/2

020

95.0

068

2AS

COSE

RVIC

ESIN

C14

7855

718

9122

6/17

/202

094

0.00

1587

AT&

T00

0014

8373

7718

9123

6/17

/202

03,

816.

8815

87AT

&T

0000

1483

7378

1891

236/

17/2

020

40.1

315

87AT

&T

0000

1483

7379

1891

236/

17/2

020

40.1

315

87AT

&T

0000

1483

7380

1891

236/

17/2

020

59.3

714

61AT

&T

MOB

ILIT

Y87

7870

430X

0601

2020

1891

246/

17/2

020

2,18

6.63

2463

BLUE

BEAM

,INC

.12

5288

718

9125

6/17

/202

01,

646.

0081

BOOT

WOR

LDIN

C29

104

1891

266/

17/2

020

646.

7110

7CA

LTRO

LINC

CD99

1039

2118

9128

6/17

/202

021

1.06

107

CALT

ROLI

NCCD

9910

4395

1891

286/

17/2

020

1,16

8.65

2327

CBIO

NE01

1172

4IN

1891

296/

17/2

020

3,25

0.00

2534

CHRI

SGA

TEW

OOD

INDU

STRI

ES,I

NC.

2019

127

1891

306/

17/2

020

752.

1316

2CH

ARLE

SP

CROW

LEY

COIN

C26

962

1891

316/

17/2

020

3,17

9.81

112

CITY

OFCA

RLSB

AD97

4070

000

04/2

018

9132

6/17

/202

039

.42

112

CITY

OFCA

RLSB

AD97

4070

200

04/2

018

9132

6/17

/202

071

.08

112

CITY

OFCA

RLSB

AD50

8800

0000

04/2

018

9132

6/17

/202

012

,371

.57

133

COAS

TW

ASTE

MAN

AGEM

ENT

1258

246

0274

718

9133

6/17

/202

096

4.06

164

CSRM

A65

9018

9134

6/17

/202

04,

074.

0049

4DA

ILY

JOUR

NALC

ORPO

RATI

ONA3

3677

4418

9135

6/17

/202

083

.20

2530

DXP

ENTE

RPRI

SES,

INC

5140

7373

1891

366/

17/2

020

823.

8622

9FE

DERA

LEXP

RESS

CORP

698

851

626

1891

376/

17/2

020

325.

5622

9FE

DERA

LEXP

RESS

CORP

700

063

381

1891

376/

17/2

020

12.6

222

9FE

DERA

LEXP

RESS

CORP

700

660

244

1891

376/

17/2

020

74.8

924

1FL

OSY

STEM

SIN

CF1

7919

20D1

4318

9138

6/17

/202

02,

942.

1024

40GA

TEW

AYPA

CIFI

CCO

NTRA

CTOR

SIN

C90

2312

05/2

0ES

CROW

1891

396/

17/2

020

21,0

25.2

924

50GA

TEW

AYPA

CIFI

CCO

NTRA

CTOR

S,IN

C.90

2312

05/2

018

9140

6/17

/202

039

9,48

0.80

2500

GILM

ANCO

NSTR

UCTI

ONM

EDIA

,LLC

1605

1891

416/

17/2

020

339.

00

SOLI

DSPR

OCES

SUN

ITCE

NTRI

FUGE

FEED

PUM

PPR

IMAR

YAR

EAIM

PROV

EMEN

TSES

CROW

PRIM

ARY

AREA

IMPR

OVEM

ENTS

PROJ

ECT

CONS

TRUC

TION

PROJ

ECT

VIDE

OGRA

PHY

SERV

ICES

ADVE

RTIS

EMEN

TIN

VENT

ORY

DAF

POLY

PUM

PSH

IPPI

NGSH

IPPI

NGSH

IPPI

NG

FY20

20M

ETER

FOR

FIRE

MAI

NBL

DGFY

2020

MET

ERFO

RFI

REM

AIN

BLDG

FY20

20PO

TABL

EW

ATER

FY20

20TR

ASH

PICK

UPW

CPA

YROL

LAUD

IT

PIPI

NGAN

DEL

ECTR

ICAL

REPA

IRPI

PING

AND

ELEC

TRIC

ALRE

PAIR

SPEC

IALT

YSE

RVIC

ESPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

CWRF

PLAN

NED

MAI

NTEN

ANCE

UFSY

STEM

PUM

PRE

PLAC

EMEN

T

FY20

20M

ONTH

LYPH

ONE

SERV

ICE

FY20

20M

ONTH

LYPH

ONE

SERV

ICE

FY20

20W

IREL

ESS

SERV

ICE

INFO

RMAT

ION

SYST

EMS

BLUE

BEAM

REVU

LICE

NSES

SAFE

TYEQ

UIPM

ENT

SAFE

TYBO

OTS

TOXI

CITY

TEST

ING

SPEC

IALT

YSE

RVIC

ESSP

ECIA

LTY

SERV

ICES

FY20

20M

ONTH

LYPH

ONE

SERV

ICE

FY20

20M

ONTH

LYPH

ONE

SERV

ICE

EWPC

FBI

OSOL

IDS

MAN

AGEM

ENT

SUM

MAR

YSP

ECIA

LTY

SERV

ICES

SAFE

TYSU

PPLI

ESIN

VENT

ORY

D.O.

SENS

ING

MOD

ULE

SPEC

IALT

YSE

RVIC

ES

LAB

SUPP

LIES

CRED

ITM

EMO

HVAC

UPGR

ADES

DESI

GNBU

ILD

PROC

UREM

ENT

SUPP

ORT

FY20

20CA

PITA

LIM

PROV

EMEN

TPR

OGRA

MM

ANAG

EMEN

TSU

PPOR

THE

ATDR

YER

SYST

EMAS

SESS

MEN

T

SHAR

PCO

PIER

USAG

E

JANI

TORI

ALSU

PPLI

ESCH

EMIC

ALS

CHEM

ICAL

SSO

DIUM

HYDR

OXID

EFO

RCW

RFCH

EMIC

ALS

SODI

UMBI

SULF

ATE

SODI

UMBI

SULF

ITE

25%

LEGA

LSER

VICE

SPU

RETE

CLA

BDI

SERV

ICE

PURE

TEC

LAB

DISE

RVIC

EPU

RETE

CLA

BDI

SERV

ICES

PRET

REAT

MEN

TCW

RFR E

CYCL

EW

ATER

STOR

AGE

BASI

N

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20CE

PTPO

LYM

ERLE

GALS

ERVI

CES

LEGA

LSER

VICE

SLE

GALS

ERVI

CES

FY20

20PE

STCO

NTRO

LSER

VICE

SEW

AFY

2020

PEST

CONT

ROLS

ERVI

CES

PUM

PST

ATIO

NSFY

2020

PEST

CONT

ROLS

ERVI

CES

EWA

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

FY20

20PE

STCO

NTRO

LSER

VICE

SEW

AFY

2020

PEST

CONT

ROLS

ERVI

CES

EWA

FY20

20PE

STCO

NTRO

LSER

VICE

SPU

MP

STAT

IONS

9-25

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

2428

HAZE

NAN

DSA

WYE

R20

145

000

918

9142

6/17

/202

02,

963.

9624

28HA

ZEN

AND

SAW

YER

2014

500

11

1891

426/

17/2

020

7,24

6.35

234

JRFI

LANC

CONS

TRUC

TION

COM

PANY

INC

606

/20

1891

436/

17/2

020

74,4

63.8

319

5KE

NGR

ODY

FORD

INC

3132

1318

9144

6/17

/202

053

.84

325

KENN

EDY

JENK

SCO

NSUL

TING

1392

2918

9145

6/17

/202

05,

395.

0021

74LA

RRY

WAL

KER

ASSO

CIAT

ESIN

C00

538.

027

1891

466/

17/2

020

1,91

4.00

1173

LOGI

CALI

SS0

1186

918

9147

6/17

/202

095

,756

.00

1173

LOGI

CALI

SS0

1187

018

9147

6/17

/202

011

,865

.00

1247

JAM

ESM

ATTE

RNM

ATTE

RNED

REIM

B5/

2018

9148

6/17

/202

018

1.40

2419

MIC

HAEL

BARR

ANON

BARR

ANON

EDRE

IM5/

2018

9149

6/17

/202

020

7.00

2467

NORT

HERN

TOOL

&EQ

UIPM

ENT

CATA

LOG

HOLD

INGS

,INC

4453

5642

1891

506/

17/2

020

199.

3341

7OF

FICE

DEPO

TIN

C49

6096

5220

0118

9151

6/17

/202

090

2.54

417

OFFI

CEDE

POT

INC

4960

9695

3001

1891

516/

17/2

020

435.

2920

75OL

INCO

RPOR

ATIO

N28

3476

318

9152

6/17

/202

03,

916.

9120

75OL

INCO

RPOR

ATIO

N28

3766

618

9152

6/17

/202

03,

973.

0220

75OL

INCO

RPOR

ATIO

N28

3838

718

9152

6/17

/202

03,

726.

1144

6PE

RKIN

ELM

ERHE

ALT H

SCIE

NCES

5304

5151

3818

9153

6/17

/202

01,

039.

0244

6PE

RKIN

ELM

ERHE

ALTH

SCIE

NCES

5304

5180

3318

9153

6/17

/202

014

0.91

1914

PETT

YCA

SHPE

TTY

CASH

06/2

018

9154

6/17

/202

061

0.31

451

PITN

EYBO

WES

INC

3103

9847

3818

9155

6/17

/202

026

0.97

2322

PROM

INEN

TSY

STEM

SIN

C23

852R

EV18

9156

6/17

/202

050

,292

.75

2013

RADW

ELLI

NTER

NATI

ONAL

INC

3140

6089

1891

576/

17/2

020

653.

7946

7RE

DW

ING

SHOE

STOR

E19

22

4202

118

9158

6/17

/202

034

8.19

467

RED

WIN

GSH

OEST

ORE

564

143

5018

9158

6/17

/202

014

6.03

2252

REPU

BLIC

SERV

ICES

OFSA

NDI

EGO

0529

0031

7923

018

9159

6/17

/202

07,

385.

2720

32RI

GHT

OFW

AYEN

GINE

ERIN

GSE

RVIC

ESIN

C83

5418

9160

6/17

/202

084

0.00

1679

RMAU

TOM

ATIO

NIN

C00

0229

2018

9161

6/17

/202

03,

052.

3614

07JO

ESA

LLAY

SALL

AYED

REIM

05/2

018

9162

6/17

/202

070

.00

1407

JOE

SALL

AYSA

LLAY

EDRE

IM4/

205

1891

626/

17/2

020

70.0

014

07JO

ESA

LLAY

SALL

AYED

REIM

4/20

618

9162

6/17

/202

070

.00

1407

JOE

SALL

AYSA

LLAY

EDRE

IM5/

202

1891

626/

17/2

020

70.0

014

07JO

ESA

LLAY

SALL

AYED

REIM

5/20

318

9162

6/17

/202

070

.00

605

SAN

DIEG

OGA

S&

ELEC

TRIC

7938

05/2

018

9163

6/17

/202

02,

239.

1760

5SA

NDI

EGO

GAS

&EL

ECTR

IC84

9305

/20

1891

636/

17/2

020

12,0

56.4

324

61SA

VING

SACR

EDSI

TES

SSS

EPA

2A04

/20

1891

646/

17/2

020

279.

4470

4SD

G&E

SUND

RY51

2612

8018

9165

6/17

/202

029

.34

483

SSM

ECHA

NICA

LCON

STRU

CTIO

NCO

RP.

9081

0418

9166

6/17

/202

010

7,54

5.86

2473

STAN

EKCO

NSTR

UCTO

RS,I

NC.

007

05/2

018

9167

6/17

/202

012

0,09

9.09

2475

BANN

ERBA

NK00

705

/20

ESCR

OW18

9168

6/17

/202

06,

621.

0152

1SW

RCB

AVIL

ADI

AZOI

TIFY

2018

9169

6/17

/202

012

5.00

1017

TELE

DYNE

INST

RUM

ENTS

,INC

.S0

2039

9608

1891

706/

17/2

020

1,86

2.03

184

TEST

AMER

ICA

LABO

RATO

RIES

INC

4400

0397

0618

9171

6/17

/202

013

2.50

184

TEST

AMER

ICA

L ABO

RATO

RIES

INC

4400

0399

5018

9171

6/17

/202

067

.50

184

TEST

AMER

ICA

LABO

RATO

RIES

INC

4400

0399

8918

9171

6/17

/202

054

4.00

184

TEST

AMER

ICA

LABO

RATO

RIES

INC

4400

0400

8818

9171

6/17

/202

01,

383.

0018

4TE

STAM

ERIC

ALA

BORA

TORI

ESIN

C44

0004

0110

1891

716/

17/2

020

42.5

018

4TE

STAM

ERIC

ALA

BORA

TORI

ESIN

C44

0004

0111

1891

716/

17/2

020

132.

5018

4TE

STAM

ERIC

ALA

BORA

TORI

ESIN

C44

0004

0112

1891

716/

17/2

020

67.5

054

9SA

NDI

EGO

UNIO

NTR

IBUN

E45

8004

1805

/20

1891

726/

17/2

020

650.

4224

39UN

IVER

SALP

ROTE

CTIO

NSE

RVIC

ELP

1012

6865

1891

736/

17/2

020

10,4

27.0

214

60US

BANK

CORP

ORAT

EPA

YMEN

TSY

STEM

S42

4604

4555

6538

5005

2018

9174

6/17

/202

03,

154.

5856

7VI

STA

IRRI

GATI

ONDI

STRI

CT99

1400

2300

05/2

018

9175

6/17

/202

015

7.75

2354

WAY

NEGO

SSET

TFO

RD60

320

0218

1891

766/

17/2

020

36,6

06.3

823

54W

AYNE

GOSS

ETT

FORD

603

2002

181

1891

766/

17/2

020

3,75

6.42

1980

WHI

TENE

LSON

DIEH

LEVA

NSLL

P20

5122

1891

776/

17/2

020

5,70

9.60

$1,9

23,6

48.8

513

7CO

LONI

ALIN

SURA

NCE

CO93

4969

705

1338

942

936/

17/2

020

394.

2817

16IC

MA

#303

941

5106

543

076/

17/2

020

33,1

54.3

060

9IG

OE&

COM

PANY

INC

2170

2143

086/

17/2

020

100.

0017

17NA

TION

WID

E#0

0409

9900

151

066

4315

6/17

/202

03,

882.

6117

55CA

LPER

SFI

SCAL

SERV

DIV

OPEB

FY20

1891

276/

17/2

020

30,0

00.0

0$6

7,53

1.19

509

SKC

WES

TIN

C03

3225

7AIN

4324

6/24

/202

0(8

46.4

4)VO

IDCH

ECK

LIFE

INSU

RANC

EPR

EMIU

MS

MAY

Payr

ollR

un1

War

rant

0617

20FY

2020

EMPL

OYEE

REIM

BURS

EMEN

TBE

NEFI

TSPa

yrol

lRun

1W

arra

nt06

1720

END

OFFY

2020

OPEB

TRUS

TFU

NDCO

NTRI

BUTI

ON

FY20

20PO

TABL

EW

ATER

CIP

VEHI

CLES

NEW

2020

FORD

VAN

CIP

VEHI

CLES

NEW

2020

FORD

VAN

FY20

20FI

NANC

IALS

ERVI

CES

OUTS

IDE

LAB

ANAL

YSIS

OUTS

IDE

LAB

ANAL

YSIS

ADVE

RTIS

MEN

TSPL

ANT

SECU

RITY

CAL

CARD

CHAR

GES

MAY

OUTS

IDE

LAB

ANAL

YSIS

OUTS

IDE

LAB

ANAL

YSIS

OUTS

IDE

LAB

ANAL

YSIS

OUTS

IDE

LAB

ANAL

YSIS

OUTS

IDE

LAB

ANAL

YSIS

SCAD

ANE

TWOR

KIN

FRAS

TRUC

TURE

IDI

GEST

ERCL

EANI

NGAN

DCO

ATIN

GDI

GEST

ERCL

EANI

NGAN

DCO

ATIN

GES

CROW

CERT

IFIC

ATIO

NLA

BEQ

UIPM

ENT

REPA

IRAU

TOSA

MPL

ERSU

PPLI

ES

TUIT

ION

REIM

BURS

EMEN

TEL

ECTR

ICIT

YRB

PSEL

ECTR

ICIT

YBC

PSCU

LTUR

ALM

ONIT

ORIN

GSE

RVIC

ESM

E TER

ING

CHAR

GES

PIPI

NGAN

DEL

ECTR

ICAL

REPA

IRTU

ITIO

NRE

IMBU

RSEM

ENT

TUIT

ION

REIM

BURS

EMEN

TTU

ITIO

NRE

IMBU

RSEM

ENT

TUIT

ION

REIM

BURS

EMEN

T

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESCW

RFUF

SYST

EMS

SAFE

TYSU

PPLI

ESSA

FETY

SUPP

LIES

FY20

20GR

ITHA

ULIN

GSE

TTLE

MEN

TM

ONIT

ORIN

G

LAB

EQUI

PMEN

TRE

PAIR

LAB

EQUI

PMEN

TRE

PAIR

PETT

YCA

SH(0

3/27

/20

06/0

1/20

)FY

2020

POST

AGE

MAC

HINE

LEAS

EOD

ORRE

DUCT

ION

FACI

LITY

NO.1

C

MIS

CELL

ANEO

USOF

FICE

SUPP

LIES

MIS

CELL

ANEO

USOF

FICE

SUPP

LIES

FY20

20SO

DIUM

HYPO

CHLO

RITE

FY20

20SO

DIUM

HYPO

CHLO

RITE

FY20

20SO

DIUM

HYPO

CHLO

RITE

NEW

SERV

ERRO

OMPR

OJEC

TBU

SINE

SSNE

TWOR

KIM

PROV

EMEN

TSTU

ITIO

NRE

IMBU

RSEM

ENT

TUIT

ION

REIM

BURS

EMEN

TJA

NITO

RIAL

SUPP

LIES

ASSE

TRE

NEW

ALM

ANAG

EMEN

TPI

LOT

TASK

ORDE

RNO

.1CO

GEN

STRU

CTUR

ALRE

PAIR

SHOR

ING

SYST

EMIN

STAL

LATI

ONM

OBIL

EEQ

UIPM

ENT

REPA

IRVE

HICL

EIN

SPEC

TION

FY20

21R

CAM

PUP

DATE

PROF

ESSI

ONAL

SERV

ICES

DATA

,PRA

CTIC

ESAN

DPR

OCES

SESS

9-26

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

(846

.44)

UNIO

NBA

NKAN

ALYS

ISDE

FICI

TM

AY6/

25/2

020

$1,2

66.8

0BA

NKFE

E$1

,266

.80

1683

ACCO

UNTI

NGPR

INCI

PALS

INC

1108

6420

4331

6/30

/202

093

1.00

1683

ACCO

UNTI

NGPR

INCI

PALS

INC

1110

2105

4331

6/30

/202

01,

087.

8016

83AC

COUN

TING

PRIN

CIPA

LSIN

C11

1202

1343

316/

30/2

020

1,07

8.00

1683

ACCO

UNTI

NGPR

INCI

PALS

INC

1115

4857

4331

6/30

/202

01,

068.

2016

83AC

COUN

TING

PRIN

CIPA

LSIN

C11

1709

7143

316/

30/2

020

1,08

7.80

1683

ACCO

UNTI

NGPR

INCI

PALS

INC

1121

4164

4331

6/30

/202

01,

097.

6016

83AC

COUN

TING

PRIN

CIPA

LSIN

C11

2223

1743

316/

30/2

020

294.

0016

83AC

COUN

TING

PRIN

CIPA

LSIN

C11

2067

9243

316/

30/2

020

1,09

7.60

411

AJIL

ON11

2072

2643

326/

30/2

020

499.

2041

1AJ

ILON

1139

434

4332

6/30

/202

01,

146.

6041

1AJ

ILON

1139

9461

4332

6/30

/202

01,

248.

0041

1AJ

ILON

1128

1051

4332

6/30

/202

01,

248.

0041

1AJ

ILON

1117

1738

4332

6/30

/202

01,

154.

4041

1AJ

ILON

1118

9245

4332

6/30

/202

01,

248.

0041

1AJ

ILON

1115

5280

4332

6/30

/202

084

2.40

411

AJIL

ON11

1210

1943

326/

30/2

020

1,24

8.00

411

AJIL

ON11

1023

0943

326/

30/2

020

998.

4041

1AJ

ILON

1108

6518

4332

6/30

/202

099

8.40

2214

AMAN

DAYO

UNG

RIGB

YRI

GBY

BOD

06/2

043

336/

30/2

020

213.

2122

54AM

ERIC

ANSE

CURI

TYGR

OUP

2685

243

346/

30/2

020

4,72

1.71

2254

AMER

ICAN

SECU

RITY

GROU

P26

905

4334

6/30

/202

01,

500.

0022

07AR

BON

EQUI

PMEN

TCO

RPOR

ATIO

N24

0351

A43

356/

30/2

020

4,99

6.27

2207

ARBO

NEQ

UIPM

ENT

CORP

ORAT

ION

2403

56A

4335

6/30

/202

04,

996.

2722

07AR

BON

EQUI

PMEN

TCO

RPOR

ATIO

N24

7625

A43

356/

30/2

020

4,50

5.93

2207

ARBO

NEQ

UIPM

ENT

CORP

ORAT

ION

2476

37A

4335

6/30

/202

03,

878.

1810

06BA

KER

ELEC

TRIC

,INC

2054

7*02

4336

6/30

/202

015

,506

.27

91BR

OWN

&CA

LDW

ELL

4437

0650

4337

6/30

/202

039

,476

.87

1364

CALI

FORN

IAW

ATER

TECH

NOLO

GIES

3759

443

386/

30/2

020

6,40

9.88

1364

CALI

FORN

IAW

ATER

TECH

NOLO

GIES

3763

843

386/

30/2

020

6,43

2.55

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8806

443

396/

30/2

020

2,13

7.50

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8806

543

396/

30/2

020

2,27

4.00

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8806

643

396/

30/2

020

13,2

05.0

017

96CA

ROLL

OEN

GINE

ERS,

INC.

0188

067

4339

6/30

/202

012

,858

.75

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8806

843

396/

30/2

020

5,01

2.03

1796

CARO

LLO

ENGI

NEER

S,IN

C.01

8806

943

396/

30/2

020

11,7

52.9

417

96CA

ROLL

OEN

GINE

ERS,

INC.

0188

070

4339

6/30

/202

07,

452.

9017

96CA

ROLL

OEN

GINE

ERS,

INC.

0188

368

4339

6/30

/202

08,

723.

5522

91CA

THER

INE

BLAK

ESPE

ARBL

AKES

PEAR

BOD

06/2

043

406/

30/2

020

213.

2122

91CA

THER

INE

BLAK

ESPE

ARBL

AKES

PEAR

CIC

06/2

043

406/

30/2

020

213.

2123

11CD

MSM

ITH

9009

9374

4341

6/30

/202

022

,583

.50

2311

CDM

SMIT

H90

1012

5543

416/

30/2

020

30,3

37.0

023

11CD

MSM

ITH

9010

1274

4341

6/30

/202

05,

574.

2514

40CD

WGO

VERN

MEN

TZC

D797

043

426/

30/2

020

10,9

95.0

014

40CD

WGO

VERN

MEN

TZC

J667

643

426/

30/2

020

141.

2714

40CD

WGO

VERN

MEN

TZC

Q76

7243

426/

30/2

020

26,5

35.1

414

40CD

WGO

VERN

MEN

TZC

W88

9743

426/

30/2

020

1,93

4.11

1440

CDW

GOVE

RNM

ENT

ZDG0

095

4342

6/30

/202

018

0.89

1440

CDW

GOVE

RNM

ENT

ZDG0

691

4342

6/30

/202

01,

600.

4514

40CD

WGO

VERN

MEN

TZD

H224

943

426/

30/2

020

3,50

5.91

1440

CDW

GOVE

RNM

ENT

ZDM

8104

4342

6/30

/202

054

2.67

2486

CORI

NNE

SCHU

MAC

HER

SCHU

MAC

HER

BOD

06/2

043

436/

30/2

020

213.

2115

20DG

SOF

SSE

RVIC

ERE

VOLV

ING

FUND

1418

758

4344

6/30

/202

035

,929

.30

2182

DSSE

RVIC

ESOF

AMER

ICA

INC

1394

9775

0612

2043

456/

30/2

020

44.0

017

22EL

AINE

SULL

IVAN

SULL

IVAN

BOD

06/2

043

466/

30/2

020

213.

2120

8EL

ECTR

ICAL

SALE

SIN

C05

4208

0243

476/

30/2

020

2,90

7.90

1430

ENTE

RPRI

SEIN

DUST

RIAL

SUPP

LYIN

C66

489

4348

6/30

/202

02,

549.

3714

30EN

TERP

RISE

INDU

STRI

ALSU

PPLY

INC

6670

743

486/

30/2

020

1,57

8.38

219

ENVI

RONM

ENTA

LRES

OURC

EAS

SOCI

ATES

9404

0843

496/

30/2

020

934.

7220

58EV

ANTE

CCO

RPOR

ATIO

N20

2019

8843

506/

30/2

020

357.

8620

58EV

ANTE

CCO

RPOR

ATIO

N20

2020

7843

506/

30/2

020

95.2

6LA

BSU

PPLI

ES

AERA

TION

PROJ

ECT

SOLI

DSPR

OCES

SUN

ITS

HOSE

REPL

ACEM

ENT

DRYE

RCA

KEPU

MP

DAF

WIP

ERAR

MS

MAI

NTEN

ANCE

LAB

SUPP

LIES

LAB

SUPP

LIES

CIP

BOAR

DRO

OMRE

HABI

LITA

TION

BOD

MEE

TING

06/2

4/20

NATU

RALG

ASM

AY20

20FY

2020

DRIN

KING

WAT

ERSE

RVIC

ESBO

DM

EETI

NG06

/24/

20

INFO

RMAT

ION

SYST

EMS

COM

PUTE

RRE

PLAC

EMEN

TSIN

FORM

ATIO

NSY

STEM

SDE

LLTO

WER

SOFT

WAR

EBO

ARD

ROOM

REHA

BILI

TATI

ONIN

FORM

ATIO

NSY

STEM

SCO

MPU

TER

REPL

ACEM

ENTS

INFO

RMAT

ION

SYST

EMS

COM

PUTE

RRE

PLAC

EMEN

TS

PRIM

ARY

AREA

IMPR

OVEM

ENTS

ESDC

PRIM

ARY

AREA

IMPR

OVEM

ENTS

ESDC

DESI

GNBU

ILD

DOCU

MEN

TSFO

RSC

ADA

NETW

ORK

DESI

GNPR

OJEC

TIN

FORM

ATIO

NSY

STEM

SM

AINT

ENAN

CESO

FTW

ARE

RENE

WAL

PLAN

TW

IDE

DOOR

CAM

ERA

MON

ITOR

S

COGE

NBL

DGST

RUCT

URAL

REPA

IRPR

OJEC

TES

DC&

CMCO

GEN

BLDG

STRU

CTUR

ALRE

PAIR

PROJ

ECT

ESDC

&CM

ODOR

CONT

ROLM

ASTE

RPL

ANEN

GINE

ERIN

GSE

RVIC

ESBO

DM

EETI

NG06

/24/

20CI

CM

EETI

NG06

/17/

20

ENGI

NEER

ING

SERV

ICES

FOR

RAS

BOR

F1FA

NRE

PLAC

EMEN

TEV

ALUA

TION

REVE

NUE

AND

FINA

NCIA

LPRO

GRAM

EVAL

UATI

ONUP

DATE

LAND

OUTF

ALLR

EPAI

RPR

OJEC

TES

DCSO

LIDS

THIC

KENI

NGDE

SIGN

PROJ

ECT

PLAN

TW

IDE

HING

EAN

DCO

NTRO

LLER

REPL

ACEM

ENT

NEM

APPL

ICAT

ION

PROJ

ECT

DIGE

STER

CLEA

NING

AND

COAT

ING

ENGI

NEER

ING

SERV

ICES

DURI

NGCO

NSTR

UCTI

ONFY

2020

FERR

ICCH

LORI

DEFY

2020

FERR

ICCH

LORI

DE

CWRF

MIN

ORRE

HABI

LITA

TION

DOOR

SECU

RITY

CIP

MIG

RATE

SURV

EILA

NCE

SERV

ERCW

RFM

INOR

REHA

BILI

TATI

ONPE

DEST

RIAN

DOOR

REPA

IRCW

RFM

INOR

R EHA

BILI

TATI

ONPE

DEST

RIAN

DOOR

REPA

IRRB

PSM

INOR

REHA

BILI

TATI

ONST

ATIO

NDO

ORRE

PAIR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

BOD

MEE

TING

6/24

/20

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

TEM

PORA

RYLA

BOR

9-27

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

1005

FCIF

LUID

COM

PONE

NTS

INTE

RNAT

IONA

L11

3333

343

516/

30/2

020

870.

0023

20FI

NALT

OUCH

LAND

SCAP

ING

170

4352

6/30

/202

01,

880.

0024

0FI

SHER

SCIE

NTIF

IC13

0353

843

536/

30/2

020

50.9

224

0FI

SHER

SCIE

NTIF

IC10

9050

543

536/

30/2

020

464.

4324

0FI

SHER

SCIE

NTIF

IC11

8910

143

536/

30/2

020

219.

5824

0FI

SHER

SCIE

NTIF

IC11

8911

143

536/

30/2

020

70.5

224

0FI

SHER

SCIE

NTIF

IC05

3452

843

536/

30/2

020

2,35

8.65

240

FISH

ERSC

IENT

IFIC

0534

529

4353

6/30

/202

01,

058.

1624

0FI

SHER

SCIE

NTIF

IC06

3713

443

536/

30/2

020

23.9

224

0FI

SHER

SCIE

NTIF

IC07

3947

343

536/

30/2

020

143.

9624

0FI

SHER

SCIE

NTIF

IC07

3947

543

536/

30/2

020

627.

0924

0FI

SHER

SCIE

NTIF

IC01

9623

243

536/

30/2

020

848.

4426

3GI

ERLI

CHM

ITCH

ELLI

NC15

768

4354

6/30

/202

02,

411.

4026

8GR

AING

ERIN

C95

5724

7534

4355

6/30

/202

036

8.59

268

GRAI

NGER

INC

9564

6814

2843

556/

30/2

020

303.

7526

8GR

AING

ERIN

C95

4576

1398

4355

6/30

/202

056

.30

268

GRAI

NGER

INC

9546

1219

1543

556/

30/2

020

112.

6071

0HA

ROLD

JMAR

TIN

MAR

TIN

BOD

06/2

043

566/

30/2

020

213.

2113

80HA

WTH

ORNE

POW

ERSY

STEM

SSS

1001

2074

943

576/

30/2

020

335,

877.

3012

42JO

SEPH

MIC

HAEL

MOS

CAM

OSCA

BOD

06/2

043

596/

30/2

020

213.

2117

23JU

DYRI

TTER

RITT

ERCI

C06

/20

4360

6/30

/202

021

3.21

1723

JUDY

RITT

ERRI

TTER

BOD

06/2

043

606/

30/2

020

213.

2117

24KE

ITH

BLAC

KBUR

NBL

ACKB

URN

CIC

06/2

043

616/

30/2

020

213.

2117

24KE

ITH

BLAC

KBUR

NBL

ACKB

URN

BOD

06/2

043

616/

30/2

020

213.

2118

73SK

YHAW

KIN

DUST

RIES

INC

2916

943

626/

30/2

020

143.

2518

73SK

YHAW

KIN

DUST

RIES

INC

2902

343

626/

30/2

020

143.

2523

23M

ALLO

RYSA

FETY

AND

SUPP

LYLL

C48

6008

243

636/

30/2

020

183.

1823

23M

ALLO

RYSA

FETY

AND

SUPP

LYLL

C48

6008

343

636/

30/2

020

366.

3529

9M

ATHE

SON

TRIG

AS21

8236

3643

646/

30/2

020

618.

5137

2M

CMAS

TER

CARR

SUPP

LYCO

4052

2171

4365

6/30

/202

011

9.94

372

MCM

ASTE

RCA

RRSU

PPLY

CO41

3401

0943

656/

30/2

020

133.

7137

2M

CMAS

TER

CARR

SUPP

LYCO

4092

7546

4365

6/30

/202

01,

427.

8122

48M

WM

ECHA

NICA

LINC

1057

7599

4366

6/30

/202

02,

409.

0024

13ON

SIGH

TSA

FETY

OPTI

CSLL

C20

0143

686/

30/2

020

400.

0014

32PR

OCOP

IOCO

RYHA

RGRE

AVES

&SA

VITC

HLL

P71

7192

4370

6/30

/202

017

,698

.50

2514

SERV

ICE

FILT

RATI

ONCO

RPOR

ATIO

N28

2147

4371

6/30

/202

072

9.13

509

SKC

WES

TIN

C00

3225

7AIN

R43

726/

30/2

020

846.

4423

92UN

IVAR

USA

INC

4862

6560

4373

6/30

/202

095

0.36

2392

UNIV

ARUS

AIN

C48

6272

4243

736/

30/2

020

900.

7912

22VA

UGHA

NSIN

DUST

RIAL

REPA

IRCO

INC

0271

5443

746/

30/2

020

13,3

38.7

715

51W

ESTA

IRGA

SES

&EQ

UIPM

ENT

INC

1104

6635

4375

6/30

/202

013

0.66

1865

WOO

DARD

&CU

RRAN

INC

1773

4843

766/

30/2

020

500.

0025

38W

ESTE

RNEL

ECTR

ICIT

YCO

ORDI

NATI

NGCO

UNCI

LCI

POLI

NIRE

G06

/20

243

776/

30/2

020

25.0

083

53W

IRE,

LLC

0041

567

1891

786/

30/2

020

196.

3521

AIRG

ASUS

ALL

C90

9290

5703

1891

796/

30/2

020

1,72

9.05

21AI

RGAS

USA

LLC

9100

5827

1118

9180

6/30

/202

086

.36

1718

ALLA

NJU

LIUS

SEN

JULI

USSE

NCI

C06

/20

1891

816/

30/2

020

213.

2117

18AL

LAN

JULI

USSE

NJU

LIUS

SEN

BOD

06/2

018

9181

6/30

/202

021

3.21

1718

ALLA

NJU

LIUS

SEN

JULI

USSE

NAG

E06

/20

1891

816/

30/2

020

213.

2123

56AL

LIAN

CECO

RPOR

ATIO

N20

2981

1891

826/

30/2

020

3,62

8.15

1622

ANIX

TER

INC

18K4

4149

218

9183

6/30

/202

01,

490.

2816

22AN

IXTE

RIN

C18

K441

493

1891

836/

30/2

020

1,85

4.56

1622

ANIX

TER

INC

18K4

4187

118

9183

6/30

/202

01,

390.

8516

22AN

IXTE

RIN

C18

K443

013

1891

836/

30/2

020

1,49

0.28

1622

ANIX

TER

INC

18K4

4335

018

9183

6/30

/202

02,

965.

2280

3AP

PLIE

DIN

DUST

RIAL

TECH

NOLO

GIES

7019

1134

9518

9184

6/30

/202

015

1.68

925

ARAM

ARK

UNIF

ORM

&CA

REER

APPA

REL

0014

5133

7575

1891

856/

30/2

020

444.

9892

5AR

AMAR

KUN

IFOR

M&

CARE

ERAP

PARE

L00

1451

3600

8018

9185

6/30

/202

059

2.74

925

ARAM

ARK

UNIF

ORM

&CA

REER

APPA

REL

1451

3485

4918

9185

6/30

/202

037

4.78

925

ARAM

ARK

UNIF

ORM

&CA

REER

APPA

REL

1451

3719

5018

9185

6/30

/202

042

0.06

682

ASCO

SERV

ICES

INC

1489

694

1891

866/

30/2

020

16,1

28.7

123

95AT

&T

4274

8055

0118

9187

6/30

/202

056

2.04

863

BAY

CITY

ELEC

TW

ORKS

INC

W22

5904

1891

886/

30/2

020

1,83

5.78

FY20

20UN

IFOR

MRE

NTAL

&CL

EANI

NGBC

PSM

INOR

REHA

BILI

TATI

ONAU

TOM

ATIC

TRAN

SFER

SWIT

CHRE

PLAC

EMEN

TFY

2020

SWIT

CHED

ETHE

RNET

SERV

ICES

GENE

RATO

RTE

STIN

G

PLAN

TW

IDE

KEY

PAD

REPL

ACEM

ENT

DOOR

SPL

ANT

REPA

IRS

PART

SAN

DSU

PPLI

ESFY

2020

UNIF

ORM

RENT

AL&

CLEA

NING

FY20

20UN

IFOR

MRE

NTAL

&CL

EANI

NGFY

2020

UNIF

ORM

RENT

AL&

CLEA

NING

RTO

MAI

NTEN

ANCE

PLAN

TW

IDE

DOOR

LOCK

SPL

ANT

WID

EDO

ORLO

CKS

PLAN

TW

IDE

KEY

PAD

REPL

ACEM

ENT

DOOR

SPL

ANT

WID

EDO

ORLO

CKS

SAFE

TYEQ

UIPM

ENT

PROT

ECTI

VECL

OTHI

NGSA

FETY

EQUI

PMEN

TCI

CM

EETI

NG06

/17/

20BO

DM

EETI

NG06

/24/

20AG

ENDA

REVI

EW06

/23/

20

MIN

ORRE

HABI

LITA

TION

FLOW

AYVE

RTIC

ALPU

MP

REPA

IRPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

PRIM

ARY

AREA

IMPR

OVEM

ENTS

CEQ

ACO

MPL

IANC

ESP

ECIA

LTY

SERV

ICES

LAB

SUPP

LIES

LEGA

LSER

VICE

SPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

MEC

HANI

CALS

EAL

LAB

SUPP

LIES

CHEM

ICAL

SSO

DIUM

HYDR

OXID

E25

%FO

RCW

RFCH

EMIC

ALS

SODI

UMBI

SULF

ITE

25%

FOR

CWRF

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESPU

REGR

EEN

MAR

KETI

NGZI

PTI

ESPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

SPEC

IALT

YSE

RVIC

ESSA

FETY

EQUI

PMEN

T

AGEN

DADE

LIVE

RIES

PFC

&CI

CAG

ENDA

DELI

VERI

ESSA

FETY

SUPP

LIES

SAFE

TYSU

PPLI

ESFY

2020

LIQ

UID

NITR

OGEN

BOD

MEE

TING

06/2

4/20

CIC

MEE

TING

06/1

7/20

BOD

MEE

TING

06/2

4/20

CIC

MEE

TING

06/1

7/20

BOD

MEE

TING

06/2

4/20

SAFT

EYSU

PPLI

ESSA

FTEY

SUPP

LIES

SAFT

EYSU

PPLI

ESBO

DM

EETI

NG06

/24/

20M

AJOR

OVER

HAUL

PROJ

ECT

FOR

ENGI

NENO

.1

LAB

SUPP

LIES

LAB

S UPP

LIES

LAB

SUPP

LIES

PRIM

ARY

SEDI

MEN

TARY

TANK

SSA

FETY

SUPP

LIES

LAB

SUPP

LIES

LAB

SUPP

LIES

LAB

MIN

OREQ

UIPM

ENT

REPL

ACEM

ENT

OVEN

LAB

SUPP

LIES

LAB

SUPP

LIES

SPEC

IALT

YSE

RVIC

ESFY

2020

LAND

SCAP

ING

LAB

SUPP

LIES

LAB

SUPP

LIES

9-28

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

863

BAY

CITY

ELEC

TW

ORKS

INC

W22

5905

1891

886/

30/2

020

751.

1486

3BA

YCI

TYEL

ECT

WOR

KSIN

CW

2259

0618

9188

6/30

/202

01,

557.

1286

3BA

YCI

TYEL

ECT

WOR

KSIN

CW

2259

0718

9188

6/30

/202

058

6.56

863

BAY

CITY

ELEC

TW

ORKS

INC

W22

6146

1891

886/

30/2

020

475.

1286

3BA

YCI

TYEL

ECT

WOR

KSIN

CW

2261

4718

9188

6/30

/202

072

0.63

863

BAY

CITY

ELEC

TW

ORKS

INC

W22

6148

1891

886/

30/2

020

877.

8286

3BA

YCI

TYEL

ECT

WOR

KSIN

CW

2261

4918

9188

6/30

/202

067

5.60

2528

CIRA

APPS

LIM

ITED

2344

618

9190

6/30

/202

01,

200.

0011

2CI

TYOF

CARL

SBAD

0050

9000

0005

/20

1891

916/

30/2

020

73.5

211

2CI

TYOF

CARL

SBAD

0111

8100

0005

/20

1891

916/

30/2

020

135.

0516

9CW

EACH

AMBE

RSCE

RT20

1891

926/

30/2

020

94.0

049

4DA

ILY

JOUR

NALC

ORPO

RATI

ONA3

3662

4018

9193

6/30

/202

074

.10

2536

DAPR

ACO

RPOR

ATIO

N51

1954

818

9194

6/30

/202

07,

624.

0515

14DE

NALI

WAT

ERSO

LUTI

ONS

LLC

0027

450

IN18

9195

6/30

/202

019

,764

.71

1514

DENA

LIW

ATER

SOLU

TION

SLL

C00

2705

6IN

1891

956/

30/2

020

12,5

49.5

215

14DE

NALI

WAT

ERSO

LUTI

ONS

LLC

0027

057

IN18

9195

6/30

/202

05,

089.

7515

14DE

NALI

WAT

ERSO

LUTI

ONS

LLC

0027

058

IN18

9195

6/30

/202

02,

502.

3918

82DI

RECT

V37

5384

6229

318

9196

6/30

/202

010

3.99

1005

FCIF

LUID

COM

PONE

NTS

INTE

RNAT

IONA

L11

3333

418

9197

6/30

/202

056

0.00

229

FEDE

RALE

XPRE

SSCO

RP7

036

5024

518

9198

6/30

/202

077

.82

229

FEDE

RALE

XPRE

SSCO

RP7

042

7370

518

9198

6/30

/202

012

7.78

241

FLO

SYST

EMS

INC

F179

1220

D150

1891

996/

30/2

020

12,1

00.8

126

0GL

OBAL

POW

ERGR

OUP

INC.

6870

218

9200

6/30

/202

015

,836

.41

260

GLOB

ALPO

WER

GROU

PIN

C.68

724

1892

006/

30/2

020

15,8

36.4

126

0GL

OBAL

POW

ERGR

OUP

INC.

6899

218

9200

6/30

/202

011

,769

.66

2256

HARO

LDBE

CK&

SON

INC

3236

5518

9201

6/30

/202

09,

967.

2524

28HA

ZEN

AND

SAW

Y ER

2014

500

12

1892

026/

30/2

020

8,63

5.00

283

HOM

EDE

POT

CRED

ITSE

RVIC

ES50

5502

118

9203

6/30

/202

032

.38

283

HOM

EDE

POT

CRED

ITSE

RVIC

ES90

1126

318

9203

6/30

/202

033

4.49

2386

HVAC

MEC

HANA

LYSI

S,IN

C16

4454

0418

9204

6/30

/202

045

0.00

2028

JIMHE

RNAN

DEZ

HERN

ANDE

ZBO

D06

/20

1892

056/

30/2

020

213.

2120

28JIM

HERN

ANDE

ZHE

RNAN

DEZ

CIC

06/2

018

9205

6/30

/202

021

3.21

234

JRFI

LANC

CONS

TRUC

TION

COM

PANY

INC

706

/20

1892

066/

30/2

020

14,2

60.9

219

5KE

NGR

ODY

FORD

INC

3144

4918

9207

6/30

/202

055

.57

195

KEN

GROD

YFO

RDIN

C31

3273

1892

076/

30/2

020

1,17

5.00

325

KENN

EDY

JENK

SCO

NSUL

TING

1394

8218

9208

6/30

/202

062

,658

.55

325

KENN

EDY

JENK

SCO

NSUL

TING

1394

8318

9208

6/30

/202

025

,367

.90

325

KENN

EDY

JENK

SCO

NSUL

TING

1394

8418

9208

6/30

/202

033

,810

.30

330

KONE

CRAN

ES,I

NC15

4296

925

1892

096/

30/2

020

1,29

6.75

2174

LARR

YW

ALKE

RAS

SOCI

ATES

INC

0053

8.02

818

9210

6/30

/202

01,

751.

0011

73LO

GICA

LIS

S011

871

1892

126/

30/2

020

14,4

30.0

011

73LO

GICA

LIS

S011

872

1892

126/

30/2

020

2,45

0.00

1173

LOGI

CALI

SS0

1187

318

9212

6/30

/202

013

,837

.50

1173

LOGI

CALI

SS 0

1187

418

9212

6/30

/202

012

,235

.00

2096

MIC

HAEL

BONI

FACI

NIBO

NIFA

CINI

EDRE

IM5/

2018

9213

6/30

/202

039

0.65

2518

MOU

SER

ELEC

TRON

ICS,

INC.

5679

0218

1892

146/

30/2

020

722.

1924

17OC

CUPA

TION

ALHE

ALTH

CENT

ERS

OFCA

LIFO

RNIA

,68

1990

1918

9215

6/30

/202

010

8.00

417

OFFI

CEDE

POT

INC

4960

9695

4001

1892

166/

30/2

020

52.9

841

7OF

FICE

DEPO

TIN

C50

9147

6580

0118

9216

6/30

/202

01,

487.

4541

7OF

FICE

DEPO

TIN

C49

3894

9760

0118

9216

6/30

/202

038

5.30

2075

OLIN

CORP

ORAT

ION

2840

273

1892

176/

30/2

020

3,77

2.61

2075

OLIN

CORP

ORAT

ION

2843

240

1892

176/

30/2

020

3,89

2.86

2081

PERK

INEL

MER

HEAL

THSC

IENC

ESIN

C53

0452

4809

1892

186/

30/2

020

422.

6023

22PR

OMIN

ENT

SYST

EMS

INC

2391

818

9219

6/30

/202

050

,770

.63

2378

QUA

LITY

SECU

RITY

SERV

ICES

5448

318

9220

6/30

/202

04,

155.

0023

78Q

UALI

TYSE

CURI

TYSE

RVIC

ES54

484

1892

206/

30/2

020

4,95

6.50

1407

JOE

SALL

AYSA

LLAY

EDRE

IM5/

204

1892

216/

30/2

020

70.0

014

07JO

ESA

LLAY

SALL

AYED

REIM

5/20

518

9221

6/30

/202

070

.00

1407

JOE

SALL

AYSA

LLAY

EDRE

IM5/

206

1892

216/

30/2

020

70.0

014

07JO

ESA

LLAY

SALL

AYED

REIM

5/20

718

9221

6/30

/202

070

.00

605

SAN

DIEG

OGA

S&

ELEC

TRIC

9575

06/2

018

9222

6/30

/202

090

,034

.45

605

SAN

DIEG

OGA

S&

ELEC

TRIC

6192

06/2

018

9222

6/30

/202

070

6.02

605

SAN

DIEG

OGA

S&

ELEC

TRIC

4616

06/2

018

9222

6/30

/202

08,

838.

85EL

ECTR

ICIT

YCW

RFEL

ECTR

ICIT

YCW

RF

TUIT

ION

REIM

BURS

EMEN

TTU

ITIO

NRE

IMBU

RSEM

ENT

TUIT

ION

REIM

BURS

EMEN

TTU

ITIO

NRE

IMBU

RSEM

ENT

ELEC

TRIC

ITY

EWPC

F

FY20

20SO

DIUM

HYPO

CHLO

RITE

LAB

EQUI

PMEN

TRE

PAIR

ICP

PROB

EOD

ORRE

DUCT

ION

FACI

LITY

NO.1

CCW

RFM

NOR

REHA

BILI

TATI

ONIN

STAL

LCON

DUIT

TOCO

NNEC

TDO

ORS

PLAN

TW

IDE

HING

EAN

DCO

NTRO

LLER

REPL

ACEM

ENT

SAFE

TYAN

DM

EDIC

ALSE

RVIC

ESM

ISCE

LLAN

EOUS

OFFI

CESU

PPLI

ESM

ISCE

LLAN

EOUS

OFFI

CESU

PPLY

MIS

CELL

ANEO

USOF

FICE

SUPP

LIES

FY20

20SO

DIUM

HYPO

CHLO

RITE

BUSI

NESS

NETW

ORK

IMPR

OVEM

ENTS

BUSI

NESS

NETW

ORK

IMPR

OVEM

ENTS

BUSI

NESS

NETW

ORK

IMPR

OVEM

ENTS

TUIT

ION

REIM

BURS

EMEN

TIN

FORM

ATIO

NSY

STEM

SHA

RDW

ARE

TASK

ORDE

RNO

.3DI

GEST

ERCL

EANI

NG&

COAT

ING

PROJ

ECT

CMS

SERV

ICES

TASK

ORDE

RNO

.4NE

TWOR

KIM

PROV

EMEN

TPH

ASE

1PR

OJEC

TCM

SSP

ECIA

LTY

SERV

ICES

PROF

ESSI

ONAL

SERV

ICES

BUSI

NESS

NETW

ORK

IMPR

OVEM

ENTS

CIC

MEE

TING

06/1

7/20

TASK

ORDE

RNO

.1CO

GEN

STRU

CTUR

ALRE

PAIR

SHOR

ING

SYST

EMIN

STAL

LATI

ONM

OBIL

EEQ

UIPM

ENT

REPA

IRM

OBIL

EEQ

UIPM

ENT

REPA

IRTA

SKOR

DER

NO.1

PRIM

ARY

AREA

IMPR

OVEM

ENTS

CMS

ASSE

TRE

NEW

ALM

ANAG

EMEN

TPI

LOT

PLAN

TRE

PAIR

PART

SAN

DSU

PPLI

ESPL

ANT

REPA

IRPA

RTS

AND

SUPP

LIES

SPEC

IALT

YSE

RVIC

ESBO

DM

EETI

NG06

/24/

20

PRIM

ARIE

SM

OYNO

2000

PUM

PRE

BUIL

DCO

GEN

REPL

ACE

UPS

BATT

ERIE

SCO

GEN

REPL

ACE

UPS

BATT

ERIE

SCO

GEN

SHUT

TRIP

BREA

KER

INST

ALLA

TION

CIP

2WFL

OWCO

NTRO

LVAL

VERE

PLAC

EMEN

T

FY20

20BI

OSOL

IDS

HAUL

ING

AND

HAND

LING

SERV

ICES

FY20

20DI

RECT

VSE

RVIC

ESSP

ECIA

LTY

SERV

ICES

EFFL

UENT

TEST

ING

EFFL

UENT

TEST

ING

ADVE

RTIS

EMEN

TSTE

CHNI

CALS

ERVI

CES

ASSE

TID

MAR

KING

MAC

HINE

FY20

20BI

OSOL

IDS

HAUL

ING

AND

HAND

LING

SERV

ICES

FY20

20BI

OSOL

IDS

HAUL

ING

AND

HAND

LING

SERV

ICES

FY20

20BI

OSOL

IDS

HAUL

ING

AND

HAND

LING

SERV

ICES

FUEL

FOR

GENE

RATO

RSIN

FORM

ATIO

NSY

STEM

SCI

RASY

NCSU

BSCR

IPTI

ONFY

2020

POTA

BLE

WAT

ERFY

2020

POTA

BLE

WAT

ERCE

RTIF

ICAT

ION

GENE

RATO

RTE

STIN

GGE

NERA

TOR

TEST

ING

FUEL

FOR

GENE

RATO

RSFU

ELFO

RGE

NERA

TORS

FUEL

FOR

GENE

RATO

RS

GENE

RATO

RTE

STIN

G

9-29

VEND

OR

NAM

EIN

VOIC

ECH

ECK

NOCH

ECK

DATE

INVO

ICE

NET

ACCO

UNTS

PAYA

BLE

CHEC

KRE

GIST

ERJU

NE20

20

INVO

ICE

DESC

RIPT

ION

605

SAN

DIEG

OGA

S&

ELEC

TRIC

8493

06/2

018

9222

6/30

/202

011

,501

.49

605

SAN

DIEG

OGA

S&

ELEC

TRIC

8747

06/2

018

9222

6/30

/202

010

,286

.59

605

SAN

DIEG

OGA

S&

ELEC

TRIC

8488

06/2

018

9222

6/30

/202

011

,254

.81

605

SAN

DIEG

OGA

S&

ELEC

TRIC

2055

06/2

018

9222

6/30

/202

012

.08

605

SAN

DIEG

OGA

S&

ELEC

TRIC

2781

06/2

018

9222

6/30

/202

031

,008

.02

605

SAN

DIEG

OGA

S&

ELEC

TRIC

1319

06/2

018

9222

6/30

/202

03,

121.

0620

66SL

OAN

ELEC

TROM

ECHA

NICA

LSER

VICE

5716

5918

9223

6/30

/202

04,

913.

9710

17TE

LEDY

NEIN

STRU

MEN

TS,I

NC.

S020

4033

7518

9224

6/30

/202

039

1.35

184

TEST

AMER

ICA

LABO

RATO

RIES

INC

4400

0407

7018

9225

6/30

/202

037

.50

184

TEST

AMER

ICA

LABO

RATO

RIES

INC

4400

0408

1618

9225

6/30

/202

019

5.00

184

TEST

AMER

ICA

LABO

RATO

RIES

INC

4400

0408

2018

9225

6/30

/202

067

.50

184

TEST

AMER

ICA

LABO

RATO

RIES

INC

4400

0410

4518

9225

6/30

/202

027

.50

1635

THE

NYHA

RTCO

MPA

NYR1

6000

818

9226

6/30

/202

02,

250.

0024

39UN

IVER

SALP

ROT E

CTIO

NSE

RVIC

ELP

1015

9477

1892

276/

30/2

020

10,1

86.0

320

50VE

RIZO

NW

IREL

ESS

9856

3581

5718

9228

6/30

/202

012

5.12

$1,3

20,3

70.1

517

16IC

MA

#303

941

5130

943

586/

30/2

020

32,7

48.6

117

17NA

TION

WID

E#0

0409

9900

151

310

4367

6/30

/202

03,

918.

7699

7PI

CKER

ING

INSU

RANC

ESE

RVIC

ESIN

C99

6943

696/

30/2

020

300.

0099

7PI

CKER

ING

INSU

RANC

ESE

RVIC

ESIN

C99

7043

696/

30/2

020

300.

0017

55CA

LPER

SFI

SCAL

SERV

DIV

PEPR

AUA

L06/

2018

9189

6/30

/202

04,

469.

0017

55CA

LPER

SFI

SCAL

SERV

DIV

CLAS

SIC

UAL0

6/20

1891

896/

30/2

020

95,5

31.0

022

76LE

GALS

HIEL

D01

4753

106

/20

1892

116/

30/2

020

33.9

0$1

37,3

01.2

7$4

,548

,444

.39

$1,3

01,4

78.8

5$3

,246

,965

.54

$4,5

48,4

44.3

9CA

PITA

LFUN

DTO

TAL

GRAN

DTO

TAL

TOTA

LACC

OUN

TSPA

YABL

EDI

SBUR

SEM

ENTS

OPE

RATI

NGFU

NDTO

TAL

EMPL

OYEE

BENE

FITS

BROK

ERAG

EEM

PLOY

EEBE

NEFI

TSBR

OKER

AGE

CALP

ERS

UNFU

NDED

LIAB

ILIT

YPE

PRA

PLAN

2714

0CA

LPER

SUN

FUND

EDLI

ABIL

ITY

CLAS

SIC

PLAN

1586

LEGA

LSER

VICE

S

PLAN

TSE

CURI

TYFY

2020

TELE

PHON

EW

IREL

ESS

Payr

ollR

un1

War

rant

0701

20Pa

yrol

lRun

1W

arra

nt07

0120

OUTS

IDE

LAB

ANAL

YSIS

OUTS

IDE

LAB

ANAL

YSIS

OUTS

IDE

LAB

ANAL

YSIS

OUTS

IDE

LAB

ANAL

YSIS

GASB

74/7

5OP

EBRE

PORT

ING

&AC

TUAR

IALV

ALUA

TION

ELEC

TRIC

ITY

AHPS

ELEC

TRIC

ITY

BVPS

ELEC

TRIC

ITY

AHPS

SPEC

IALT

YSE

RVIC

ESLA

BEQ

UIPM

ENT

REPA

IR

ELEC

TRIC

ITY

BCPS

ELEC

TRIC

ITY

AHPS

ELEC

TRIC

ITY

CWRF

9-30

ITEM 10 TREASURER'S CASH AND INVESTMENTSREPORT DASHBOARD FOR JUNE 2020

$0.3M$2M

$4M

$6M

$8M

$10M

$12M

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY2020

Receipts

$5.2M

$2M

$4M

$6M

$8M

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY2020

Disbursements

$96K

$677K

$279K$2M

$4M

$6M

$8M

$10M

$12M

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY2020

Cash & Investments

Total LAIF CAMP Cash

This represents unaudited data. 10-1

Ref: F&HR.20 4029

ENCINA WASTEWATER AUTHORITY

BOARD OF DIRECTORS

Item : 10

Date : July 22, 2020

To : Honorable Chair and Board of Directors

From : LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor

Issue : TREASURER’S CASH AND INVESTMENT REPORT FOR JUNE 2020

STAFF RECOMMENDS THE BOARD OF DIRECTORS:

Receive and file the Treasurer’s Cash and Investment Report for June 2020.

FIVE YEAR STRATEGIC BUSINESS PLAN REFERENCE

Strategic Initiative No. 6: Continue fiscal responsibility and revenue generation.

DISCUSSION

Cash. EWA’s cash book balance on June 30, 2020 was $676,607.34.

Reserves. EWA’s Financial Reserve Policy was last amended on June 26, 2019 by Resolution No. 2019 02funding EWA’s operating, remote facility, capital, and inventory reserves to meet anticipated cashrequirements.

Investments. EWA’s investments consist of funds deposited with the LAIF and CAMP. The total LAIF balanceat the end of June was $279,130.55 and the total CAMP balance at the end of June was $95,791.84. Themost recent LAIF and CAMP statement for the month of June 2020 is attached for your reference.

Total Cash & Investments. Cash and investments on June 30, 2020 total $1,051,529.73.

June 30, 2020 May 31, 2020

Operating Account $675,607.34 $5,764,820.82

Petty Cash $1,000.00 $1,000.00

Sub Total: Cash $676,607.34 $5,765,820.82

LAIF Investments $279,130.55 $82,130.55

CAMP Investments $95,791.84 $95,751.58

Total Cash and Investments $1,051,529.73 $5,943,702.95

10-2

Cash Receipts. EWA received payments for Source Control violations, Lab Services, Puregreen Sales, FOGand Brewery Waste, South Parcel Lease, and miscellaneous receipts totaling $74,286.51. CAMP dividendsincome for $40.26 were received for the month of June 2020.

Cash Disbursements. Checks and electronic payments were issued totaling $5,180,820.46.

Endorsements. By the signature affixed above, I, LeeAnn Warchol, Administrative Services Manager andTreasurer/Auditor of the Encina Wastewater Authority hereby certify that:

Michael Steinlicht, General Manager, received this report on July 13, 2020.

The Board of Directors will consider this report on July 22, 2020.

All investments comply with EWA’s Investment Policy adopted by Resolution No. 2019 02 on June26, 2019.

THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS:

Receive and file the Treasurer’s Cash and Investment Report for June 2020.

Attachment 1: Statement of Investment Information June 2020 and Monthly YieldAttachment 2: Local Agency Investment Fund June 2020 StatementAttachment 3: California Asset Management Program June 2020 Statement

Prepared by: Grace Gilberg, Accounting Technician IIReviewed by: Mariana Grindley, Accounting Technician IIApproved by: LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor

10-3

ATTACHMENT 1

STATEMENT OF INVESTMENT INFORMATION

AND MONTHLY YIELD

JUNE 2020

July 22, 2020

10-4

FUNDS ON DEPOSIT WITH AMOUNT

LOCAL AGENCY INVESTMENT FUNDJUNE 2020 YIELD 1.217%

TOTAL DEPOSIT 4,097,000.00$TOTAL WITHDRAWAL 3,900,000.00$CLOSING BALANCE 279,130.55$

CALIFORNIA ASSET MANAGEMENT PROGRAMJUNE 2020 YIELD .51%

TOTAL DEPOSIT 40.26$TOTAL WITHDRAWAL $CLOSING BALANCE 95,791.84$

TOTAL INVESTMENT FUNDS 374,922.39$

STATEMENT OFINVESTMENT INFORMATION

AS OF JUNE 30, 2020

10-5

ATTACHMENT 2

LOCAL AGENCY INVESTMENT FUND

JUNE 2020 STATEMENT

July 22, 2020

10-6

Local Agency Investment Fund P.O. Box 942809Sacramento, CA 94209-0001(916) 653-3001

July 11, 2020

LAIF HomePMIA Average Monthly Yields

ENCINA WASTEWATER AUTHORITY

TREASURER 6200 AVENIDA ENCINAS CARLSBAD, CA 92009-0171

Account Number: 40-37-004

June 2020 Statement

Tran Type Definitions

Effective Date

Transaction Date

Tran Type Confirm

Number

Web Confirm Number Authorized Caller Amount

6/5/2020 6/4/2020 RD 1643050 1603118 LEEANN WARCHOL 4,097,000.00 6/17/2020 6/16/2020 RW 1643678 1603761 LEEANN WARCHOL -2,100,000.00 6/30/2020 6/30/2020 RW 1644586 1604677 LEEANN WARCHOL -1,800,000.00

Account Summary

Total Deposit: 4,097,000.00 Beginning Balance: 82,130.55

Total Withdrawal: -3,900,000.00 Ending Balance: 279,130.55

Page 1 of 1LAIF Regular Monthly Statement

7/11/2020https://laifms.treasurer.ca.gov/RegularStatement.aspx

10-7

Jun 1.217May 1.363Apr 1.648

PMIA Quarter to Date(1): 1.89%208PMIA Average Life(1):

2.03LAIF Apportionment Rate(2):0.000055354606930461.007481015

LAIF Earnings Ratio(2): LAIF Fair Value Factor(1):

PMIA Daily(1): 1.73%

Treasuries52.38%

Agencies20.78%

Certificates of Deposit/Bank Notes

13.17%

Time Deposits5.44%

Commercial Paper7.64%

Loans0.57%

Notes: The apportionment rate includes interest earned on the CalPERS Supplemental Pension Payment pursuant to Government Code 20825 (c)(1) and interest earned on the Wildfire Fund loan pursuant to Public Utility Code 3288 (a).

Source:(1) State of California, Office of the Treasurer(2) State of Calfiornia, Office of the Controller

PMIA Average Monthly Effective Yields(1)

PMIA/LAIF Performance Reportas of 07/09/20

Daily rates are now available here. View PMIA Daily Rates

Quarterly PerformanceQuarter Ended 03/31/20

Percentages may not total 100% due to rounding

Pooled Money Investment AccountMonthly Portfolio Composition (1)

06/30/20$101.0 billion

10-8

ATTACHMENT 3

CALIFORNIA ASSET MANAGEMENT PROGRAM

JUNE 2020 STATEMENT

July 22, 2020

10-9

10-10

10-11

Website www.camponline.com Phone (800) 729-7665 Fax (415) 982-4513 Email [email protected]

2. The Trust also may publish a “monthly distribution yield.” The monthly distribution yield represents the net change inthe value of a hypothetical account with a value of one share (normally $1.00 per share) resulting from all dividendsdeclared during a month by the Pool expressed as a percentage of the value of one share at the beginning of themonth. This resulting net change is then annualized by multiplying it by 365 and dividing it by the number of calendardays in the month.

This information is for institutional investor use only, not for further distribution to retail investors, and does not representan offer to sell or a solicitation of an offer to buy or sell any fund or other security. Investors should consider the Trust’sinvestment objectives, risks, charges and expenses before investing in the Trust. This and other information about theTrust is available in the Trust’s current Information Statement, which should be read carefully before investing. A copy ofthe Trust’s Information Statement may be obtained by calling 1-800-729-7665 or is available on the Trust’s website atwww.camponline.com. While the Trust seeks to maintain a stable net asset value of $1.00 per share, it is possible to losemoney investing in the Trust. An investment in the Trust is not insured or guaranteed by the Federal Deposit InsuranceCorporation or any other government agency. Shares of the Trust are distributed by PFM Fund Distributors, Inc.,member Financial Industry Regulatory Authority (FINRA) (www.finra.org) and Securities Investor Protection Corporation(SIPC) (www.sipc.org). PFM Fund Distributors, Inc. is a wholly owned subsidiary of PFM Asset Management LLC.

CAMP Cash Reserve Portfolio

Current Annualized Yield1: 0.48%

Monthly Distribution Yields2

1. As of June 30, 2020. Past performance is not indicative of future results and yields may vary. The “current annualizedyield” of the Pool may, from time to time, be quoted in reports, literature and advertisements published by the Trust.Current annualized yield represents the net change, exclusive of capital changes and income other than investmentincome, in the value of a hypothetical account with a balance of one share (normally $1.00 per share) over a seven-daybase period expressed as a percentage of the value of one share at the beginning of the seven-day period. Thisresulting net change in account value is then annualized by multiplying it by 365 and dividing the result by 7.

.

2014 2015 2016 2017 2018 2019 2020

January 0.06% 0.07% 0.38% 0.85% 1.43% 2.62% 1.78%

February 0.07% 0.06% 0.45% 0.85% 1.50% 2.64% 1.75%

March 0.06% 0.07% 0.50% 0.89% 1.62% 2.61% 1.50%

April 0.05% 0.08% 0.48% 0.96% 1.84% 2.55% 0.98%

May 0.06% 0.08% 0.49% 0.97% 1.95% 2.52% 0.67%

June 0.06% 0.09% 0.51% 1.05% 2.05% 2.48% 0.51%

July 0.05% 0.10% 0.55% 1.12% 2.11% 2.42%

August 0.06% 0.11% 0.64% 1.14% 2.12% 2.28%

September 0.05% 0.13% 0.64% 1.15% 2.14% 2.22%

October 0.05% 0.14% 0.66% 1.17% 2.27% 2.05%

November 0.05% 0.15% 0.66% 1.20% 2.36% 1.88%

December 0.05% 0.23% 0.72% 1.29% 2.46% 1.80%

10-12

Ref: Admin.20‐14171 

ENCINA WASTEWATER AUTHORITY 

BOARD OF DIRECTORS 

Item   :  12 

Date  :  July 22, 2020 

To  :  Honorable Chair and Board of Directors 

From  :  Michael Steinlicht, General Manager 

Issue  :  JUNE 2020 TACTICAL PLAN STATUS REPORT  

STAFF RECOMMENDS THE BOARD OF DIRECTORS:

Receive and file the June 2020 Tactical Plan Status Report. 

BACKGROUND 

The 2020 Tactical Plan describes specific activities staff will undertake during the calendar year in support of the EWA Board of Directors approved 2018‐2023 Five Year Strategic Business Plan.  The Tactical Plan consists of forty‐five (45) tactical goals distributed through eight (8) Strategic Initiatives and serves as the performance evaluation basis for the General Manager and staff.  This report summarizes staff’s progress toward completing the program objectives specified in the 2020 Tactical Plan. 

FIVE‐YEAR BUSINESS PLAN REFERENCE 

Strategic Initiative No. 8 requires EWA to provide meaningful transparency and engage key stakeholders.  

DISCUSSION 

As  detailed  in  the  June  2020  Tactical  Plan  Status  Report  (Attachment  2),  seven  (7)  of  the  Strategic Initiatives are listed as Completed, twenty‐six (26) are In‐Progress, and twelve (12) show No Progress.   

FISCAL IMPACT 

There is no fiscal impact associated with this report. 

COMMITTEE REVIEW 

The Policy & Finance Committee  reviewed  this  item  in  their  July meeting and provided  their support.  Director Sullivan asked whether EWA is witnessing any delays or setbacks as a result of COVID‐19.  General Manager  Steinlicht  responded  stating  contractors  were  asked  to  exit  the  EWA  plant  in  March  and therefore setback two to four weeks while pandemic plans and safety protocals were put into place.  Other than  these  delays,  progress  on  the  Tactical  Plan’s  Strategic  Initiatives  continues  to move  forward  as planned. 

THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

Receive and file the June 2020 Tactical Plan Status Report. 

12-1

July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors 

June 2020 Tactical Plan Status Report 

Ref: Admin. 20‐14171 

Attachment 1:   June 2020 Tactical Plan Status Report 

Prepared by:   Joseph Spence, Assistant to the General Manager Reviewed by:   Scott McClelland, Assistant General Manager Approved by:   Michael Steinlicht, General Manager 

12-2

ATTACHMENT 1 

JUNE 2020 TACTICAL PLAN STATUS REPORT 

July 22, 2020 

12-3

1 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a

OUR STRATEGIC INITIATIVES EWA relies upon the strategic business planning process to align the Vision, Mission, Core Values, and Business Principles with the strategies, objectives, goals, and tasks of everyday operations. The Strategic Business Plan is a valuable tool that provides focus and direction for all employees to ensure we achieve our operational goals. Each Strategic Initiative identified below provides structure and forward guidance on items that may come before EWA’s Board of Directors and is supported by a team of employees with diverse backgrounds, skill sets and areas of expertise. Our strategic business plan represents the future of EWA.

S I – 1 Enhance Workp lace Sa fe ty , Hea l th , and Wel lness

S I – 2 Remain an Employer o f Cho ice

S I – 3 Ma inta in Regula tory Compl iance

S I – 4 Improve In f rast ruc ture Per formance and Re l iab i l i t y

S I – 5 Expand Waste Resource Recovery E f for t s

S I – 6 Cont inue F i s ca l Respons ib i l i t y and Revenue Generat ion

S I – 7 Opt imize Operat iona l Per formance

S I – 8 Engage Key S takeho lders

12-4

2 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a

2020 TACTICAL PLAN Purpose of the Tactical Plan The 2020 Tactical Plan describes specific activities staff will undertake during the calendar year in support of the Strategic Initiatives identified in EWA’s Board of Directors approved 2018-2023 Five-Year Strategic Business Plan.

Completed

 = COMPLETED    |  In Progress

 = IN PROGRESS    |  Delayed

 = DELAYED    |  Not

Completed

 = NOT COMPLETED 

STRATEGIC INITIATIVE NO. 1: ENHANCE WORKPLACE SAFETY, HEALTH, AND WELLNESS

ID # Tactical Goal Key Performance Indicator Team Lead Target

2020 SI-1-1

Integrate the operation of the new Agua Hedionda Pump Station (AHPS) into EWA’s standardized policies & safety procedures.

Complete the AHPS lockout/tagout (LOTO), standard operating procedures and emergency response plan.

Operations Manager

July 2020

Completed

Status and Notes: Staff developed Standard Operating Procedures No. 99 documenting EWA’s policies and procedures for AHPS. With this process, staff developed seven LOTO procedures and updated the plant’s emergency bypass plan.

2020 SI-1-2

Update Encina Water Pollution Control Facility (EWPCF) Professional Qualification Standards to include Lead Operator.

Implementation of succession planning strategies through new procedures and standards with subsequent training of operational personnel.

Operations Manager

October 2020

In Progress

Status and Notes: Updating EWA’s Professional Qualification Standards is currently underway and is being tailored to more closely align with EWA’s organizational chart and expectations for incoming & advancing staff. The initial draft has been completed and is currently being reviewed.

2020 SI-1-3

Implement physical site security assessment recommendation.

Complete fortified site access (Phase I) in accordance with the newly developed site security policy.

Systems Manager

October 2020

Status and Notes:

2020 SI-1-4

Implement Heat Dryer Hazardous Operations Assessment Recommendations.

Include recommendations into the FY 2022 E-CAMP Update.

Engineering Services Manager

October 2020

Status and Notes:

12-5

3 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a   

STRATEGIC INITIATIVE NO. 2: REMAIN AN EMPLOYER OF CHOICE

ID # Tactical Goal Key Performance Indicator Team Lead Target

2020 SI-2-1

Facilitate EWA’s annual health benefits fair.

Successful flex-plan enrollment of EWA employees.

Human Resources Manager

September 2020

In Progress

Status and Notes: EWA staff is working on a modified approach to hosting its annual benefits fair due to the pandemic and social distancing requirements.

2020 SI-2-2

Initiate labor relations negotiations process.

Convene representatives from employee group and execute a professional services agreement for a salary survey.

Human Resources Manager

October 2020

Status and Notes:

2020 SI-2-3

Enhance EWA’s training and succession planning efforts.

Implement job shadowing and training-up efforts to expand institutional knowledge for EWA staff.

Human Resources Manager

December 2020

Status and Notes:

 

STRATEGIC INITIATIVE NO. 3: MAINTAIN REGULATORY COMPLIANCE

ID # Tactical Goal Key Performance Indicator Team Lead Target

2020 SI-3-1

Develop a joint Plume Tracking Monitoring Plan (PTMP) with San Elijo Joint Powers Authority and the City of Escondido to address permit requirements for EWA’s ocean discharge permit.

Submit the PTMP to the San Diego Regional Water Quality Control Board for approval.

Director of Environmental

Compliance

April 2020

In Progress

Status and Notes: The State Water Board received and reviewed EWA’s Plume Tracking Monitoring Plan and has provided initial guidance. The resubmittal was delivered to the SWB on 6/18.

2020 SI-3-2

Complete the Sediment Monitoring Study and the Intensive Ocean Monitoring requirements in accordance with Regional Water Quality Control Board approved plans.

Submit final studies to Regional Water Quality Control Board for approval.

Director of Environmental

Compliance

December 2020

In Progress

Status and Notes: Staff initiated these efforts and anticipates advertising a Request for Proposals in August to meet the NPDES permit requirements.

12-6

4 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a   

2020 SI-3-3

Review and update the Rules and Regulations for Conducting Encina Joint Advisory Committee, Encina Wastewater Authority Board of Directors, and Related Joint System Governance Committee Meetings.

Policy Finance Committee and Board of Director adoption of approved amendments.

Administrative Services Manager

October 2020

In Progress

Status and Notes: Staff is working on updating the Rules and Regulations for Conducting Encina Joint Advisory Committee, Encina Wastewater Authority Board of Directors and Related Joint System Governance Committee Meeting and will be bring these forward to the PFC for initial review once complete.

2020 SI-3-4

Determine necessary elements to modernize end‐user source control repor ng. 

Assess the value that the EPA Cross-Media Electronic Reporting Rule (CROMERR) for industrial user reporting would provide to EWA’s pretreatment program.

Source Control Manager

December 2020

Status and Notes: The National Association of Clean Water Agencies (NACWA) canceled their annual conference which was instrumental in providing the needed information and guidance. Staff is reassessing other avenues to find out information.

2020 SI-3-5

Complete EWPCF Odor Control Master Plan.

Present Plan findings to the Board of Directors and include recommendations in the FY 2022 E-CAMP Update.

Capital Projects Manager

June 2020

Completed

Status and Notes: The Odor Control Master Plan has been completed. Staff presented its findings to the Board of Directors who received and filed it in their May meeting.

STRATEGIC INITIATIVE NO. 4: IMPROVE INFRASTRUCTURE PERFORMANCE AND RELIABILITY

ID # Tactical Goal Key Performance Indicator Team Lead Target

2020 SI-4-1

Complete FY 2021 R-CAMP Present R-CAMP results to the Member Agencies (Carlsbad and Vista) and include recommendations in the FY 2021 budget.

Engineering Services Manager

April 2020

Completed

Status and Notes: The FY2021 R-CAMP is complete and has been reviewed by the respective Member Agencies. The report’s financial impact and feedback received from the Member Agencies were incorporated in to the FY2021 budget.

2020 SI-4-2

Complete EWPCF condition assessments.

Present assessment results to the Capital Improvements Committee and incorporate into future annual budgets as appropriate.

Engineering Services Manager

April 2020

Completed

Status and Notes: The condition assessments are complete and their findings were presented to the CIC in their May meeting.

   

12-7

5 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a   

2020 SI-4-3

Initiate FY 2022 E-CAMP Award professional services for the Project. Engineering

Services Manager

August 2020

Status and Notes:

2020 SI-4-4

Initiate construction on the Secondary Clarifiers Improvements Project.

Award construction contract for the Project. Engineering

Services Manager

June 2020

Completed

Status and Notes: In June, the Board of Directors awarded construction of the Secondary Clarifier Project to JR Filanc Construction Company Inc.

2020 SI-4-5

Initiate final design to remediate ground settlement at Flow Equalization basin.

Award final design services for the Project. Engineering

Services Manager

May 2020

Completed

Status and Notes: The Board of Directors awarded the Flow Equalization Basin Settlement Project Design in their February meeting.

2020 SI-4-6

Initiate final design on Solids Rotary Drum Thickening (RDT) Project

Award final design services for the Project. Director of Technical Services

July 2020

Status and Notes:

2020 SI-4-7

Complete the Cogen Emergency Wall Repair Project.

Obtain EWA Board of Directors Final Acceptance for the Project.

Capital Projects Manager

December 2020

In Progress

Status and Notes: The Cogen Emergency Wall Repair Project is currently in progress and staff regularly updates the Capital Improvement Committee on project progress. In June, the Board of Directors cured the General Manager’s award of Task Order No.2 for demolition and installation of new west wall. Currently, the contractor is in the process of replacing two of the four sections of the compromised wall.

2020 SI-4-8

Complete construction on Digester Cleaning and Coating Project.

Obtain EWA Board of Directors Final Acceptance for the Project.

Capital Projects Manager

October 2020

In Progress

Status and Notes: The Digester Cleaning and Coating Project is currently in progress and staff regularly updates the Capital Improvement Committee on project progress.

2020 SI-4-9

Complete the Primary Area Improvements Project’s phase one-of-three equipment installation.

EWA beneficial use of new equipment for Project.

Capital Projects Manager

December 2020

In Progress

Status and Notes: The Primary Area Improvements Project phase one is currently in progress and staff regularly updates the Capital Improvement Committee on project progress.

   

12-8

6 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a   

2020 SI-4-10

Surge Tower 60-inch bypass pipe replacement Project.

Award construction contract for Project. Capital Projects Manager

October 2020

Completed

Status and Notes: In June, the Board of Directors authorized the award of a Task Order to EWA’s As-Needed General Contractor for the construction of this project.  

STRATEGIC INITIATIVE NO. 5: EXPAND WASTE RESOURCE RECOVERY EFFORTS

ID # Tactical Goal Key Performance Indicator Team Lead Target

2020 SI-5-1

Initiate the development of the Biosolids Management Plan.

Award services for the Project. Engineering

Services Manager

September 2020

Status and Notes:

2020 SI-5-2

Meet with regional and key stakeholders in support of EWA’s Water Reuse initiatives.

Lobby key stakeholders to include EWA’s water resources into future water management planning and provide feedback to the Board of Directors on Water Reuse networking efforts.

Assistant General Manager

December 2020

In Progress

Status and Notes: A group of Water agencies in North County have submitted a project description and potential water supply needs that would be satisfied with an EWA Reuse Project. The group has decided to call the project North County One Water. EWA actively participates in these discussions.

 

STRATEGIC INITIATIVE NO. 6: CONTINUE FISCAL RESPONSIBILITY AND REVENUE GENERATION

ID # Tactical Goal Key Performance Indicator Team Lead Target

2020 SI-6-1

Update EWA’s 1993 Revenue and Financial Program.

Present findings to the Member Agency Managers, Policy & Finance Committee, and Board of Directors.

Director of Environmental

Compliance

December 2020

In Progress

Status and Notes: Staff and consultants started the update and testing process for the Revenue and Financial Program Project in late January. Carollo provided the MAM a review of the project scope, an update on the project timeline and an update on the sampling program review performed to-date during the MAM’s June meeting. Staff anticipates another progress update being provided to the MAM in August. Carollo and staff continue to review and update sampling and financial components of the program.

   

12-9

7 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a   

2020 SI-6-2

Conduct Independent 3rd Party Annual Financial Audit and complete EWA’s Comprehensive Annual Financial Report (CAFR)

Board of Directors receive and file final report.

Administrative Services Manager

December 2020

In Progress

Status and Notes: Staff has engaged with Vasquez & Company LLP for a one-year extension for independent financial auditing services. Staff held a kick off meeting with the Independent Auditors and had preliminary field testing conducted in May.

2020 SI-6-3

South Parcel leasing and revenue generation.

Continue to engage interested parties and the EWA Board of Directors on potential leasing opportunities.

Director of Technical Services

December 2020

In Progress

Status and Notes: The Board of Directors authorized the execution of lease options with both the Energy Storage and Vehicle Storage. Staff, EWA’s General Counsel and EWA’s Broker continue to negotiate terms of the ground leases.

2020 SI-6-4

Implement Net Energy Metering options with SDG&E to reduce EWA’s electrical cost.

Obtain new energy cost structure from SDG&E.

Director of Technical Services

November 2020

In Progress

Status and Notes: Baker Electric continue the installation of the hardware required to obtain Net Energy Metering from SDG&E.

2020 SI-6-5

Prepare and publish the Recommended Fiscal Year 2021 Operating and Capital Budget.

Apply for the Government Finance Officers Association (GFOA) Distinguished Budget Presentation Award Program.

Assistant to the General Manager

July 2020

In Progress

Status and Notes: The Board approved the FY 2021 budget unanimously in their April meeting. Staff anticipates submitting the budget to the GFOA for the presentation award once the budget has been fully adopted by the Member Agencies.

2020 SI-6-6

Provide increased financial transparency with regards to South Parcel leasing.

Early adoption of Government Accounting Standards Board Statement No. 87 regarding lease accounting and disclosures.

Assistant to the General Manager

December 2020

In Progress

Status and Notes: GASB 87 standards are being adopted to provide transparent accounting of South Parcel leasing revenues and anticipates reporting back to the Policy & Finance Committee on disclosure and revenue impacts once the Comprehensive Annual Financial Report has been fully drafted.

2020 SI-6-7

Assess potential alternative power providers.

Contact potential power providers and provide update to the Board of Directors.

Assistant General Manager

December 2020

Status and Notes:

   

12-10

8 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a   

STRATEGIC INITIATIVE NO. 7: OPTIMIZE OPERATIONAL PERFORMANCE

ID # Tactical Goal Key Performance Indicator Team Lead Target

2020 SI-7-1

Maximize digester gas utilization at EWPCF Cogen and Heat Dryer facilities.

Maintain digester gas utilization above 80% in EWPCF processes.

Operations Manager

August 2020

In Progress

Status and Notes: Digester gas utilization is being monitoring and is being maintained above the benchmark with the year-to-date utilization currently at 83%.

2020 SI-7-2

Develop an EWA Business Con nuity Plan.

Approved service agreement in place with consultant.

Administrative Services Manager

December 2020

 Status and Notes:

2020 SI-7-3

Develop Disaster Recovery Plan to recover critical systems and services in a timely manner.

Perform a simulated disaster to test the data recovery process. Present findings to the Board of Directors and include in Business Continuity Plan.

Systems Manager

December 2020

In Progress

Status and Notes: EWA’s disaster recovery simulation has been performed. Findings are being evaluated and will be incorporated into the Business Continuity Plan.

 

2020 SI-7-4

Formalize the Information Technology Strategic Plan and Standard Operating & Maintenance Procedures in response to 2019 IT audit findings.

Implement cyber security protocols and develop long term priorities to maintain security posture.

Systems Manager

September 2020

In Progress

Status and Notes: The IT Strategic Plan has been developed and has identified goals and corresponding key performance indicators (KPI) to achieve those goals. This establishes a road map for implementation of each recommendation. As a result of this plan, staff recommended, and the Board of Directors awarded, the near-term Business Network Improvements Project in April and this effort is scheduled to be completed this summer.

2020 SI-7-5

Update Emergency Bypass Plans for new Agua Hedionda Lift Station.

Submit Emergency Bypass Plans to Member Agencies for review and approval.

Operations Manager

September 2020

Status and Notes: Existing bypass plans have been reviewed and no updates were necessary. These have been posted onsite and made available to operations staff. Further updates are pending the construction status of the new station.

2020 SI-7-6

Establish standardized methods for monitoring secondary clarifier performance

Develop and implement standardized procedures for measuring solids blanket and controlling hydraulic overflow rates.

Operations Manager

September 2020

In Progress

Status and Notes: Standardized procedures for monitoring the secondary clarifier performance are currently being developed.

12-11

9 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a   

2020 SI-7-7

Assess and update EWA’s critical spares inventory.

Identify critical spares required to reduce operational down-time risks and incorporate into FY2022 budget.

CMMS Administrator

November 2020

In Progress

Status and Notes: Critical spares for each process area are being reviewed with special attention provided for systems like the heat dryer which have the potential to interrupt normal operations.

2020 SI-7-8

Implement Phase II upgrades to EWA’s Computerized Maintenance Management System (CMMS).

Develop process for cataloging all known assets and capturing their related resource management metrics in CMMS.

CMMS Administrator

August 2020

In Progress

Status and Notes: The demonstration project, which is being used to develop the process of capturing and managing assets going forward, continues and is anticipated to be completed by mid-August.

2020 SI-7-9

Provide operation, maintenance, and administrative support of EWA contract-operated remote facilities.

Submit quarterly reports to Member Agencies and hold meetings as required.

Director of Operations

December 2020

In Progress

Status and Notes: Regular reporting and virtual meetings continue to be developed and made available to the Member Agencies.

2020 SI-7-10

Digi ze EWA’s historical paper archives.

Determine the appropriate enterprise pla orm and develop a Request for Proposals.  Incorporate so ware and hardware costs in FY2022 budget.

Administrative Services Manager

December 2020

In Progress

Status and Notes: Staff is working on developing the scope of work for the implementation of a Sharepoint platform. Staff anticipates bring a recommendation forward to PFC or CIC in August or September.

STRATEGIC INITIATIVE NO. 8: ENGAGE KEY STAKEHOLDERS

ID # Tactical Goal Key Performance Indicator Team Lead Target

2020 SI-8-1

Update CWRF Memorandum of Understanding (MOU) with Carlsbad to reflect new UF system operations.

Obtain EWA Board of Directors, Joint Advisory Committee, and City of Carlsbad City Council approval of CWRF MOU.

Director of Operations

September 2020

In Progress

Status and Notes: The CWRF MOU has been updated and is currently being reviewed by the City of Carlsbad.

2020 SI-8-2

Conduct risk assessments for remote pump station facilities.

Engage Member Agency staff to jointly conduct pump station risk assessments and integrate into annual pump station report.

Director of Operations

July 2020

Status and Notes:

   

12-12

10 | E n c i n a W a s t e w a t e r A u t h o r i t y 2 0 2 0 T a c t i c a l P l a n R e f : A d m i n . 2 0 - 1 4 1 7 1 a   

2020 SI-8-3

Investigate the effects of PFAS on waste resource recovery efforts.

Provide feedback on findings and recommendations to Member Agencies and develop PFAS public informational flyer.

Director of Operations

August 2020

In Progress

Status and Notes: The State Water Board Continues to develop PFAS Investigative Order Phase 3 for sampling of Wastewater Treatment Plants. Water Board’s PFAS investigative team will meet in June to discuss sampling requirements of their forthcoming Phase 3 Order. US EPA extended the comment period from May 11 to June 10 for a preliminary regulatory determination to regulate PFOS and PFOA in drinking water.

2020 SI-8-4

Engage key stakeholders to address the flood control channel’s flow impedance and downstream vegetation growth.

Coordinate with key stakeholders to develop plan to remediate the Flood Control Channel’s restricted flow capacity.

Assistant General Manager

December 2020

In Progress

Status and Notes: Staff has contacted Sea Pointe Development and North County Transit District to discuss actions to remediate the flow capacity. Staff will continue to work with these entities to make progress on addressing the situation.

12-13

Ref: Admin.20‐14165 

ENCINA WASTEWATER AUTHORITY 

BOARD OF DIRECTORS 

Item   :  13 

Date  :  July 22, 2020 

To  :  Honorable Chair and Board Members 

From  :  Michael Steinlicht, General Manager 

Issue    :  AUDITORS’ COMMUNICATION WITH THOSE CHARGED WITH GOVERNANCE  

STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

Receive  and  file  the  Independent Auditors’  Communication  in  relation  to  the  annual  audit  of  EWA’s 

financial statements. 

BACKGROUND 

Section 13.1.9 of the Revised Basic Agreement requires the preparation of an annual independent audit 

of  EWA’s  financial  statements.  Section 2.9.2 of  the Revised  Establishment Document  requires  EWA’s 

annual  independent  audit  to  conform  to  requirements  established  for  special  districts  by  the  State 

Controller and generally accepted accounting principles (GAAP). Statements on Auditing Standards (SAS) 

are  promulgated  by  the  Auditing  Standards  Board  of  the  American  Institute  of  Certified  Public 

Accountants and provide guidance to independent auditors on GAAP. SAS No. 114 establishes standards 

for the Independent Auditors’ Communication with Those Charged with Governance in relation to an audit 

of financial statements. The Board of Directors is charged with governance in relation to EWA’s annual 

independent audit.   

FIVE‐YEAR STRATEGIC BUSINESS PLAN REFERENCE 

Tactical Goal No.  2020‐SI‐6‐2  requires  EWA  to  have  an  independent  3rd  party  annual  financial  audit 

conducted. 

DISCUSSION 

On  January 25, 2017,  the Board of Directors approved an agreement with Vasquez & Company,  LLP, 

Certified Public Accountants (Vasquez), to provide EWA with independent financial auditing services for 3 

years with the option to renew for up to 2 additional 1‐year periods. Vasquez has initiated the preliminary 

review portion of the FY2020  independent audit of EWA’s financial statements. As EWA’s  independent 

auditor,  Vasquez  is  responsible  for  forming  and  expressing  an  opinion  about whether  the  financial 

statements that have been prepared by management are fairly stated and presented in conformity with 

GAAP.   

SAS  are  promulgated  by  the  Auditing  Standards  Board  of  the  American  Institute  of  Certified  Public 

Accountants and provide guidance to independent auditors on GAAP. SAS No. 114 establishes standards 

for the Independent Auditors’ Communication with Those Charged with Governance in relation to an audit 

13-1

July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors 

Auditors’ Communication with Those Charged with Governance  Page 2 

Ref: Admin.20‐14165 

of financial statements. The Board of Directors is charged with governance in relation to EWA’s annual 

independent audit.   

SAS 114 further provides a framework for the Independent Auditors’ Communication with the Board of 

Directors  and  identifies  specific matters  to  be  communicated with  them.  The  principal  purposes  of 

communication with those charged with governance are to: 

I. Communicate clearly with those charged with governance the responsibilities of the independent

auditor in relation to the audit of EWA’s financial statements and an overview of the scope and

timing of the audit.

II. Obtain from those charged with governance information that is relevant to the audit.

III. Provide those charged with governance with timely observations arising from the audit that are

relevant to their responsibilities in overseeing the financial reporting process.

Vasquez SAS 114 communication letter dated May 20, 2020 is presented as Attachment 2. This letter is 

intended  to  encourage  two‐way  dialogue  between  Vasquez  and  the  Board  of  Directors,  and  to 

communicate important information related to the independent audit to the Board of Directors including: 

the independent auditors’ responsibilities under GAAP; the planned scope and timing of the independent 

audit; and how to contact Vasquez in the event a member of the Board of Directors is aware of matters 

that have a material bearing on EWA’s financial statements.  

Vasquez  will  communicate  significant  findings  to  the  Board  of  Directors  at  the  conclusion  of  its 

independent audit – typically in the November – December timeframe. However, some matters may be 

communicated  sooner  particularly  if  significant  difficulties  are  encountered  during  the  audit  or  if  it 

appears that there are significant internal control or other issues that could lead to a modified opinion.    

COMMITTEE REVIEW  

The  Policy  and  Finance  Committee  reviewed  this  item  in  their  July  meeting  and  approved  staff’s 

recommendation. 

FISCAL IMPACT 

There is no fiscal impact associated with this item. 

THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

Receive  and  file  the  Independent Auditors’  Communication  in  relation  to  the  annual  audit  of  EWA’s 

financial statements. 

Attachment 1:  Auditors’ Communication with Those Charged with Governance 

Prepared by:  LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor Reviewed by:  Scott McClelland, Assistant General Manager Approved by:  Michael Steinlicht, General Manager  

13-2

ATTACHMENT  1 

AUDITORS’ COMMUNICATION WITH THOSE CHARGED WITH GOVERNANCE 

July 22, 2020 

13-3

13-4

13-5

13-6

Ref: Admin.20‐14166 

ENCINA WASTEWATER AUTHORITY 

BOARD OF DIRECTORS 

Item   :  14

Date  :  July 22, 2020 

To  :  Honorable Chair and Board of Directors   

From  :  Michael Steinlicht, General Manager 

Issue  :  FY 2022 E‐CAMP UPDATE AWARD  

STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

Authorize  the  General  Manager  to  execute  a  Professional  Services  Agreement  with  Kennedy/Jenks Consultants (K/J) in the amount not to exceed $149,985 for Engineering Services for the FY 2022 E‐CAMP Update. 

BACKGROUND 

Established in 1993, the Encina Comprehensive Asset Management Plan (E‐CAMP) is a planning tool that is updated every  two years  to cost effectively manage assets over  their  full  life cycle by planning and prioritizing asset rehabilitation and replacement for the Encina Water Pollution Control Facility (EWPCF). A new E‐CAMP update  is needed to prepare for the FY 2022 budgeting effort. On March 22, 2017, the Board of Directors authorized the General Manager to execute a professional services agreement with Kennedy/Jenks Consultants (K/J) for the FY 2018 E‐CAMP Update, with the option to extend those services for additional years for additional E‐CAMP efforts. Based on K/J’s ability to effectively complete the effort, staff recommends K/J continue  to be utilized  for  the FY 2022 E‐CAMP. This authorization exceeds  the General Manager’s authority and therefore requires Board approval. 

FIVE‐YEAR STRATEGIC BUSINESS PLAN REFERENCE 

Strategic Initiative SI‐4‐3: Initiate FY 2022 E‐CAMP. 

DISCUSSION 

EWA strives to conduct sound planning to maintain reliable and cost‐effective service, as well as to invest appropriately to fully fund the cost of service, including capital improvements. The E‐CAMP is regularly updated to help EWA establish a roadmap and budget for the upcoming years to more effectively manage infrastructure at EWPCF.  

The  E‐CAMP  process  includes  five  task  elements:  project  identification;  project  evaluation;  cost estimating; prioritization; and  implementation  schedule. The  focus of most projects  identified  for  the EWPCF in the E‐CAMP are safety, regulatory compliance, reliability, public and EWA impacts, energy or organizational related. The projects are prioritized, and a six‐year project implementation schedule for FY 2022 through FY 2027 is developed using sound engineering and financial planning principles. While the 

14-1

July 22,2020 Encina Wastewater Authority (EWA) Board of Directors 

FY 2022 E‐CAMP Update Award 

Ref: Admin.20‐14166 

E‐CAMP is independent of the budgeting process, the information is leveraged in the budgeting process and provides direction to allow staff at EWA to address infrastructure needs.  

On March 22, 2017, the Board of Directors authorized the General Manager to execute a professional services agreement with K/J for the FY 2018 E‐CAMP Update.  K/J was selected from five consultants that submitted proposals  in  the Request  for  Proposals  (RFP)  for  E‐CAMP  and R‐CAMP Updates.    The RFP identified that the selected consultant could be eligible for additional years of similar services if EWA is satisfied with their effort. In each subsequent year since the original selection, K/J has completed the E‐CAMP or R‐CAMP. Although this current effort is beyond the original duration identified in the RFP, staff recommends K/J be utilized for the FY 2022 E‐CAMP because of their depth of knowledge and ability to effectively complete the effort without the need to educate a different consultant on EWPCF and the E‐CAMP process. Under  this authorization,  the E‐CAMP update will consist of meetings with EWA  staff, document  review,  site  assessments,  project  development,  project  scoring,  cost  estimating,  and implementation schedule development. Staff has negotiated the attached scope and fee for the proposed authorization.    

FISCAL IMPACT 

The fiscal impact of this recommendation is $149,985.  Sufficient appropriations are available in the FY 2021 Capital Improvement Program budget to support this action. 

MEMBER AGENCY MANAGER REVIEW 

The Member Agency Managers were briefed on this item in their July meeting and provided their support.  

COMMITTEE REVIEW 

The  Capital  Improvement  Committee  reviewed  this  item  in  their  July  meeting  and  approved  staff’s recommendation. 

THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

Authorize  the  General  Manager  to  execute  a  Professional  Services  Agreement  with  Kennedy/Jenks Consultants (K/J) in the amount not to exceed $149,985 for Engineering Services for the FY 2022 E‐CAMP Update. 

Attachment 1:  FY 2022 E‐Camp Update Proposal 

Prepared by:  Lindsey Stephenson, Engineering Services Manager Reviewed by:  Scott McClelland, Assistant General ManagerApproved by:  Michael Steinlicht, General Manager 

14-2

ATTACHMENT  1 

FY 2022 E‐CAMP UPDATE PROPOSAL 

July 22, 2020 

14-3

9325 Sky Park Court, Suite 300 | San Diego, CA 92123

858-676-7505 | [email protected]:\2019\1944105.00_ewa_fy2021 r-camp\01-prejobinfo\fy2022 e-camp\cover letter_fy2022 e-camp update_062420.docx

24 June 2020

Mr. Tucker Southern Director of Technical ServicesEncina Wastewater Authority 6200 Avenida EncinasCarlsbad, California 92011-1009

Subject: Proposal for Professional Engineering ServicesFY2022 Encina Comprehensive Asset Management Plan

Dear Mr. Southern:

Kennedy/Jenks Consultants (Kennedy Jenks) is pleased to submit this proposal to Encina Wastewater Authority (EWA) for professional engineering services for the FY2022 Encina Comprehensive Asset Management Plan (E-CAMP). The major elements to be included in this update consist of the following:

Document review and site assessmentDevelop and update project descriptions.Develop and update project scoring, costs, and implementation schedule.Prepare the FY2022 E-CAMP.

Attached is our detailed scope of services and proposed fee spreadsheet. If there is any additional information you need or any matter you wish to discuss, please feel free to contact Tim Waters at 858-676-7528, or myself at 858-676-7505.

Very truly yours,

KENNEDY/JENKS CONSULTANTS, INC.

Corey YoungVice President

Enclosures (2)

14-4

ATTACHMENT ASCOPE OF SERVICES

14-5

Page 1 of 5

ATTACHMENT A

Encina Wastewater Authority

FY2022 Encina Comprehensive Asset Management Plan

Kennedy Jenks Scope of Services

GENERAL

The Encina Comprehensive Asset Management Plan (E-CAMP) is used to develop a comprehensive and reliable budgeting process to successfully address the Encina Water Pollution Control Facility (EWPCF) infrastructure needs and challenges. The major elements to be included in the FY2022 E-CAMP consist of the following:

Document review and site assessment. Develop and update project descriptions. Develop and update project scoring, costs, and implementation schedule. Prepare the FY2022 E-CAMP.

The following describes Kennedy Jenks’ proposed scope of services for the FY2022 Encina Comprehensive Asset Management Plan.

SCOPE OF WORK

Task 1 – Document Review and Site Assessment

1.1 Document Review EWA will provide Kennedy Jenks with previous condition assessments, facility needs assessments, recent studies, and the existing major asset register for the EWPCF. Kennedy Jenks will review the documents provided by EWA prior to performing the site assessment (Task 1.2). 1.2 Site Assessment

Kennedy Jenks will perform a visual condition assessment of the EWPCF by a multi-disciplinary team of mechanical, structural, and/or electrical/instrumentation engineers to understand project concepts being discussed and confirm conditions in the field. The assessment will be performed over a two (2) day period. The visual assessment will include documenting and evaluating the major assets of the EWPCF. Kennedy Jenks’ team will note deficiencies not identified in the previous condition assessments that are identified during the site assessment, such as deterioration or degradation of structural, electrical, instrumentation, and/or mechanical items. It is assumed that EWA staff will accompany the Kennedy Jenks team during the condition assessment. Kennedy Jenks will summarize the conclusions of the site assessment for review with EWA staff regarding incorporation into the FY2022 E-CAMP. It is assumed that the conclusions of the site assessments will be reviewed and discussed as part of one of the monthly progress meetings (Task 5.3). It is also assumed that the visual condition assessment of the EWPCF by the Kennedy Jenks team over the two (2) day period will be a high-level assessment for the purposes of identifying major projects that may be included in the FY2022 E-CAMP and informing what additional and more detailed condition assessments of the EWPCF facilities may be required (to be

14-6

Page 2 of 5

performed under a separate contract). It is anticipated that EWA will use the results of the visual condition assessment to help draft the upcoming condition assessment plan.

Task 2 – Develop Project Descriptions

2.1 Project Descriptions

Kennedy Jenks will develop project descriptions for new projects that were not included in the FY2020 E-CAMP. This will include new projects identified by EWA staff, condition assessments, studies, reports, and other engineering services performed for EWA. Each project will be assigned a number and the description will be formatted to be consistent with the existing descriptions (background, description, justification and project delivery method). It is assumed that project descriptions for up fifteen (15) new projects will be developed. Project descriptions for existing projects will be used from their source documents.

2.2 Project Review Meeting

Kennedy Jenks will meet with EWA (assumed to be one 4-hour workshop) to review and discuss the draft project descriptions.

Task 3 – Develop Project Scoring, Costs and Implementation Schedule

3.1 Project Scoring Workshop

Kennedy Jenks will meet with EWA staff in a workshop setting (assumed to be one 4-hour workshop) to walk through the FY2022 E-CAMP projects and assign impact factors for each project against the established evaluation criteria. From the outcome of this workshop, projects to be included in the FY2022 E-CAMP will be assigned an evaluation score.

3.2 Cost Estimates

Kennedy Jenks will develop cost tables for each new project (up to 15) with enough detail to determine the basis for each estimate. Cost estimates will be tied to the Engineering News Record Construction Cost Index (ENR CCI) for the Los Angeles area. Existing cost estimates for previously identified projects that are in the FY2020 E-CAMP, and will be in the FY2022 E-CAMP, will be updated based on the ENR CCI.

3.3 Implementation Schedule

Identified projects will be ranked, and priorities set, in conjunction with EWA staff using the evaluation scoring results and cost estimates. After the project prioritization process, a six-year implementation schedule, with projected cost estimates, will be developed by Kennedy Jenks with assistance from EWA staff and within the constraints of the EWA capital budgeting process. It is assumed that the presentation format and breakdown of costs in the implementation plan for the FY2022 E-CAMP will be similar to the presentation in the FY2020 E-CAMP. The cost loaded implementation schedule will be reviewed with EWA staff in consideration of its overall financial plan to confirm funding availability. Subsequent adjustments to the cost loaded schedule will then be made to keep project scheduling in line with funding availability.

14-7

Page 3 of 5

Task 4 – Prepare FY2022 E-CAMP

4.1 Draft Report

Utilizing the information developed in Tasks 1-3 above, Kennedy Jenks will prepare the Draft FY2022 E-CAMP, which will include updates to the contents of the FY2020 E-CAMP, including the following sections and appendices:

Executive Summary Introduction Encina Comprehensive Asset Management Plan Process Condition Assessment Summary Studies and Other Professional Services Identification of Projects Project Evaluation and Prioritization Recommended Project Implementation Schedule & Cost Summary Appendices

o Historical Project List o Capital Project List o Basis of Estimate o Project Cost Tables o Condition Assessment Summary o Major Asset Register

The Draft FY2022 E-CAMP will be electronically submitted in WORD and a compiled PDF format to EWA for one round of review and comments.

4.2 Final Report

It is assumed that Kennedy Jenks will receive one set of consolidated comments on the Draft FY2022 E-CAMP from EWA and will discuss EWA’s comments on the Draft FY2022 E-CAMP as part of one of the monthly progress meetings (Task 5.3). Kennedy Jenks will then address comments received from EWA and the Final FY2022 E-CAMP will be electronically submitted in PDF format, and up to ten (10) hardcopies provided, to EWA. Additionally, an electronic version of the native files (WORD, EXCEL, etc.) of the Final FY2022 E-CAMP will be provided to EWA.

Task 5 – Project Management and QA/QC

5.1 Management

This task addresses the management responsibilities associated with proper scheduling review, budget control, invoice preparation and coordination with EWA’s and Kennedy Jenks’ project team.

5.2 Project Kick-Off Meeting

The project kickoff meeting will be held within one week from receipt of a NTP. This meeting will include representatives from the EWA and Kennedy Jenks. At this kickoff meeting, project reporting/communication protocols will be established, the schedule will be reviewed, information requests will be made, and any key issues will be discussed.

14-8

Page 4 of 5

5.3 Monthly Progress Meetings

Kennedy Jenks will attend up to five (5) monthly progress meetings with EWA staff to provide updates on project deliverables and allow further discussion of the project. Kennedy Jenks will prepare an agenda and presentations slides (as appropriate) for EWA’s review prior to each meeting/workshop. Draft meeting minutes with action items will be distributed within five (5) working days following the meeting. Kennedy Jenks will incorporate EWA’s comments and distribute a final record of the meeting minutes.

5.4 QA/QC

Kennedy/Jenks will perform a review of all deliverables including reports, calculations, cost estimates, etc. prior to delivery.

FEE ESTIMATE

The fee estimate for the above described services is in included in Attachment B.

SCHEDULE

The following summarizes the anticipated project schedule for the FY2022 E-CAMP assuming EWA authorizes Kennedy Jenks to proceed by the end of July 2020, an EWA review time of fourteen (14) calendar days, and the other applicable assumptions listed below. Based on this anticipated schedule, Kennedy Jenks will submit the Final FY2022 E-CAMP by February 2021.

Authorization to Proceed July 2020

Perform Condition Assessment Study August 2020

Submit Draft Project Descriptions September 2020

Submit Final Project Descriptions October 2020

Submit Draft Cost Estimates October 2020

Submit Final Cost Estimates November 2020

Submit Draft E-CAMP December 2020

Submit Final E-CAMP February 2021

ASSUMPTIONS

1. The structure of the FY2022 E-CAMP will be similar to that of the FY2020 E-CAMP.

2. All materials (TMs, condition assessments, reports, cost estimates, new projects identified by EWA staff, etc.) will be provided by EWA to Kennedy Jenks within one week of the authorization to proceed.

3. The condition assessment will be a visual assessment only. No destructive testing will be performed as part of the condition assessment.

4. EWA staff will accompany the Kennedy Jenks team during the condition assessment.

14-9

Page 5 of 5

5. The visual condition assessment of the EWPCF by the Kennedy Jenks team over the two (2) day period will be a high-level assessment for the purposes of identifying major projects that may be included in the FY2022 E-CAMP and informing what additional and more detailed condition assessments of the EWPCF facilities may be required (to be performed under a separate contract). It is anticipated that EWA will use the results of the visual condition assessment to help draft the upcoming condition assessment plan.

6. The project evaluation criteria used in the FY2020 E-CAMP will be used in the FY2022 E-CAMP with no changes made.

7. After the project review meeting and final project descriptions are submitted to EWA, no additional projects identified will be included in the FY2022 E-CAMP.

8. If a cost estimate has already been prepared for a project by others, Kennedy Jenks will use that cost estimate in the FY2022 E-CAMP. Kennedy Jenks will develop Class IV cost estimates only for new projects with no previous cost estimate developed.

9. The scope of work includes one round of review and comments by EWA for the project descriptions, cost estimates, and E-CAMP. For each review, Kennedy Jenks will receive one set of consolidated comments from EWA.

10. EWA will provide Kennedy Jenks with the following:

a. List of assets that will be included in the FY2022 through FY2027 Condition Assessments.

b. List and description of studies and professional services to be included in the FY2022 E-CAMP that are not included as, or part of, an E-CAMP project.

c. Input on updates to the historical projects list appendix in the E-CAMP.

d. Updated Major Asset Register which is maintained by EWA.

EXCLUSIONS

The following services are not included within the Kennedy Jenks's current Scope of Work:

1. Any additional and more detailed condition assessments of the EWPCF facilities are not included and would be performed under a separate contract.

14-10

ATTACHMENT BPROPOSED FEE

14-11

Task

1 -

Subt

otal

Task

2 -

Subt

otal

Task

3 -

Subt

otal

Task

4 -

Subt

otal

Task

5 -

Subt

otal

14-12

Ref: Admin.20‐14167 

ENCINA WASTEWATER AUTHORITY 

BOARD OF DIRECTORS 

Item   :  15 

Date  :  July 22, 2020 

To  :  Honorable Chair and Board of Directors 

From  :  Michael Steinlicht, General Manager 

Issue  :  FY 2021 ANNUAL SCADA SUPPORT SERVICES 

STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

Authorize the General Manager to award a Task Order to Enterprise Automation (EA) in the amount of $160,007 for FY 2021 Annual SCADA Support Services. 

BACKGROUND 

Encina Wastewater Authority’s  (EWA)  Supervisory  Control  and Data Acquisition  (SCADA)  System  is  a critical  asset  that  monitors,  controls,  and  collects  critical  data  necessary  for  the  operation  of  the wastewater  treatment process.  Like any other  critical asset and piece of  technology, SCADA  requires routine maintenance and minor upgrades to sustain system performance.  In October 2017, the Board awarded  an  As‐Needed  Professional  Services  Agreement  to  Enterprise  Automation  (EA)  for programmatic  SCADA  systems  integration  and  support.  Under  this  effort,  EA  will  provide  SCADA integration  and  support  services  for  that  routine  maintenance  and  upkeep.  The  recommendation exceeds the General Manger’s authority and therefore requires Board of Directors’ approval. 

FIVE‐YEAR BUSINESS PLAN REFERENCE 

Strategic Initiative No. 4: Improve Infrastructure Performance and Reliability 

DISCUSSION 

The  Supervisory Control  and Data Acquisition  (SCADA)  system provides  EWA  staff with  the  ability  to monitor,  control,  and  store data  for  the wastewater  treatment process  and pump  station operation. EWA has embarked on  a multi‐year effort  to  create  a more  standardized,  centralized,  and upgraded SCADA system that entails a more programmatic approach to the operational technology. In support of this effort, EA was brought on in October of 2017 to provide programmatic SCADA integration services for  five  years.  Since  then,  EA  has  provided  annual  services  for  routine  SCADA  maintenance  and upgrades.   

Under  this  authorization,  EA  will  once  again  provide  the  following  SCADA  integration  and  support services through fiscal year 2021: 

15-1

July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors 

FY 2021 Annual SCADA Support Services  

Ref: Admin.20‐14167  

1. On  Call  Support:    This  task  is  for  miscellaneous  support  services,  including  phone  calls, technical  investigations,  24  hours  a  day  –  7  days  per  week  support,  annual  planning meetings, and miscellaneous meetings in which EA is requested to participate. 

2. Windows Server Update Services  (WSUS) Updates:   This effort will  implement  the  latest Windows Server Updates. 

3. SCADA  Training:    This  task  includes  efforts  to  train  staff  on  the  SCADA  system,  with  an emphasis on the new SCADA platform.  

4. Programming Change Requests (CR):  This effort includes the collection, management, and implementation  of  programming  changes  identified  to  improve  SCADA  operation  or function. 

5. Software  Support  Renewals:    This  item  extends  service  support  for multiple  versions  of software on the new SCADA platform.  

These  annual  services  are  important  efforts  to  maintain  SCADA  system  performance  and  improve functionality.  

MEMBER AGENCY MANAGER REVIEW 

The  Member  Agency  Managers  were  briefed  on  this  item  in  their  July  meeting  and  provided  their support. 

COMMITTEE REVIEW 

The  Capital  Improvement  Committee  reviewed  this  item  in  their  July  meeting  and  approved  staff’s recommendation. 

FISCAL IMPACT 

The total fiscal impact of staff’s recommendation is $160,007. Sufficient appropriations are available in the Fiscal Year 2021 Capital Improvement Program Budget.  

THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

Authorize the General Manager to award a Task Order to Enterprise Automation (EA) in the amount of $160,007 for FY 2021 Annual SCADA Support Services.  

 

Attachment 1:  EA Proposal for FY 2021 Support Services  

Prepared by: Lindsey Stephenson, Engineering Services Manager Reviewed by: Scott McClelland, Assistant General Manager Approved by: Michael Steinlicht, General Manager 

15-2

 

 

ATTACHMENT  1  

EA PROPOSAL FOR FY 2021 SUPPORT SERVICES       

              

 July 22, 2020 

    

15-3

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 1 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

Scope of WorkFY2021 Annual Support

for

Encina Wastewater Authority

Job Number EA20EWA063

Document Revision 1.0.0

Effective Date 7/1/2020

Author Marshall McElroy

15-4

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 2 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

History

Revision Date Description of Change Author Reviewed

1.0.0 7/1/2020 Original MM LS

Table of Contents 1 Proposal Background ............................................................................................................................ 4 2 Scope of Work ....................................................................................................................................... 5

2.1 Project Management ..................................................................................................................... 5 2.2 On Call Support ............................................................................................................................. 5 2.3 WSUS Updates ............................................................................................................................. 8 2.4 SCADA Training ............................................................................................................................ 9 2.5 CRs ............................................................................................................................................... 9 2.6 Software Support .......................................................................................................................... 9

3 Assumptions & Clarifications ............................................................................................................... 10 4 Cost Estimate ...................................................................................................................................... 10

4.1 Materials ...................................................................................................................................... 10 4.2 Travel .......................................................................................................................................... 10

5 Terms & Conditions ............................................................................................................................. 11 6 Conclusion ........................................................................................................................................... 11 Appendix A: Cost Estimate Details ............................................................................................................. 12

15-5

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 3 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

Acronyms and Terms For the remainder of the document the following acronyms will be used.

Term Description

CR SCADA Change Request

EA Enterprise Automation (Integrator)

FAT Factory Acceptance Test

HMI Human Machine Interface

O&M Operation and maintenance manuals

OIT Operator Interface Terminal, stand-alone graphical interface typically found on standalone equipment or remote sites

PLC Programmable Logic Controller

PM Project Manager

SAT Site Acceptance Test

SCADA Supervisory Control and Data Acquisition (refers to the entire automation system)

Encina, the Authority

Encina Wastewater Authority

15-6

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 4 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

1 Proposal Background Enterprise Automation (EA) has been providing support for Encina Wastewater Authority SCADA assets since October 2017.

Originally, EA was engaged help develop a new SCADA system, while providing as needed support for legacy items. Throughout several projects with the Authority, EA has gained extensive knowledge and experience with all the Authority’s SCADA assets.

This document has been drafted to provide the Authority with the close cooperation and comprehensive coverage they are seeking to maintain the health of their SCADA control system.

This proposal includes budget from Annual Planning for the following items:

Annual General Support 2021

Annual WSUS Updates 2021

Annual SCADA Training 2021

Annual EWPCF CR Budgets 2021

Annual Software Support 2021

Along with the Annual Planning items, this proposal’s budget may also be used for ad-hoc and miscellaneous meetings which do not strictly fall under a specific project but are requested by the Authority.

15-7

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 5 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

2 Scope of Work This section details the scope of work for tasks included in the estimate in Appendix A.

2.1 Project Management EA will provide standard project management support for the duration of this annual support.

2.2 On Call Support

2.2.1 Basis This SCADA Support Contract provides details of the agreement between:

Encina Wastewater Authority

and

Enterprise Automation

2.2.2 Facilities Covered The services provided under this SCADA Support Contract are solely for the following facilities:

a) Encina Water Pollution Control Facility 6200 Avenida Encinas Carlsbad, CA 92011

2.2.3 Contact Details The Engineering Services Manager contact for the Authority is:

The Systems Manager contact for the Authority is:

15-8

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 6 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

2.2.4 Nature of Services The services provided by Enterprise Automation under this SCADA Support Contract are limited to the following systems:

a) SCADA software a. Schneider Electric

i. EcoStruxure Hybrid DCS ii. Wonderware Historian iii. Top View Alarm Paging Software iv. SCADA SSRS Reports

b) Rockwell/Allen Bradley a. RSView 32 b. Factory Talk SE c. Historian

c) PLC types and brands a. Schneider Electric

i. M580 PLCs b. Allen Bradley

i. PLC-5 ii. SLC-500 iii. ControLogix iv. Flex I/O v. Micrologix

d) OITs Types and Brands a. Allen Bradley

i. Panel View e) SCADA Domain PCs, Virtual Machines f) Associated SCADA networking (Cat 5/6 and fiber) g) Associated SCADA panels and I/O h) Schneider Electric VFDs i) Schenider Electric TeSys-Ts

2.2.5 Excluded Equipment The Authority has some specialized equipment with which EA does not have specific expertise. As these systems interact with the supported equipment, EA will assist with

15-9

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 7 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

diagnosing problems where possible; however the equipment is not supported by Enterprise Automation under this agreement. Equipment not supported is as follows:

a) General process equipment (Valves, pumps, motors, etc.)

b) Security systems

c) Electrical systems (MCC buckets, medium/high voltage equipment)

2.2.6 Services Provided As the Authority makes support requests, the EA project manager will work with the Authority to set an initial scope and budget for the support call, obtain approval from the Authority to proceed, and create a new budget item to track support on a case by case basis. This procedure is intended to ensure that the budget is used with discretion. If the initial budget for a support call will exceed the original estimate, the EA project manager will discuss the matter with the Authority.

2.2.6.1 Phone Support

Phone support will be provided 24 hours 7 days a week. After hours support is for critical problems only that are threatening safety or production.

Phone support is the first tier of support provided

2.2.6.2 Remote Support

Although remote support is not currently in place for the Authority, Enterprise Automation would like the opportunity to discuss setting up remote support.

To implement remote support, EA would like to establish a remote access connection to the WTP. EA intends to work with the Authority to implement the remote access connection so it can be leveraged in the future.

Remote support is the second tier of support provided, and will be provided when phone support options have been exhausted.

2.2.6.3 On-site Support

Where necessary, EA engineers will be available for on-site support, with the Authority receiving priority scheduling.

On-site support is the third tier of support provided, and will be provided when phone support and remote support options have been exhausted.

15-10

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 8 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

2.2.7 Requesting Support

2.2.7.1 Phone Call Response Times

EA will attempt to respond to any phone call within one hour. In general, Enterprise Automation will be able to begin troubleshooting a problem immediately after being contacted.

2.2.7.2 On-Site Response Times

The Authority will receive priority scheduling should on-site support be required. An engineer will therefore be dispatched to site as soon as practical.

Note that EA is located approximately 50 miles from the Authority’s facilities, and that travel time can vary from 45 minutes to 2 hours, depending on traffic conditions. Time must also be allowed for the engineer to prepare for the trip.

2.3 WSUS Updates

2.3.1 Microsoft Updates The Authority’s SCADA system consists of many computers, which require updates from Microsoft on a regular basis. The Authority’s SCADA system uses a Microsoft server-grade operating system service called Windows Server Update Services (WSUS) to manage the updates. The Authority’s IS is in control of the WSUS server onsite, Enterprise Automation (EA) controls the WSUS server on the test platform.

The key steps to the WSUS update process are:

1. EA will install and test all updates on the Authority’s test platform

2. Once the updates are proven to not interfere, EA will supply a summary report tothe Authority’s IS confirming which updates are safe for release.

3. The Authority’s IS can install updates according to EA’s report

The key advantage of this process is that it allows EA to test all updates on a replica of the onsite system, ensuring the updates do not interfere with SCADA operations (e.g. communication drivers, Windows firewalls, etc.), prior to them being installed onsite.

2.3.2 Update Failure Should an update affect the integrity of the SCADA system, EA will investigate the issue and identify a solution. Solutions may include skipping installation of the specific update(s), requesting SCADA software manufacturer support (patches, hotfixes, etc.), or identifying alternatives as recommended by Microsoft.

15-11

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 9 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

If required, EA will perform all safe updates on-site, excluding the failed update, so that the SCADA system on-site is as current as possible. This is to be confirmed by the Encina IT department.

Budget to fix failed updates would be handled as a separate CR.

2.3.3 Test Platform Updates EA has included time to apply firmware updates and VMware ESXi updates (“Remediation”) on the Authority’s test platform servers.

All onsite updates will be carried out by the Authority’s IS.

2.4 SCADA Training EA will prepare a training manual or manuals for each topic to be covered under this training portion. Topics will be decided upon via conference call with the Authority’s personnel.

EA will perform as many training sessions for the Authority’s staff onsite in one day as the budget in Attachment A allows.

2.5 CRs CRs will be investigated per EWA SPECC CR System Process 1.0.0 for each request, and then estimates provided to EWA to authorize proposed solutions. Significant efforts may be authorized via separate task order.

2.6 Software Support EA will procure the following software items for the Authority during FY21:

HDCS Support Renewal – 18 months, New exp 12/31/2021

Historian Renewal – 12 months, New exp 12/23/2021

TopView Support Renewal – 12 months, New exp 12/31/2021

Citect Anywhere Renewal – 12 months, New exp 1/31/2022

EA will work to get these software support items on the same cycle (Dec. renewals) during this FY, where previously HDCS was not.

15-12

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 10 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

3 Assumptions & Clarifications The following assumptions and clarifications were used in preparing this proposal:

1. The Authority must approve all use of this support budget, it is assumed approval must come from Lindsey Stephenson and Dave Ummel. The Authority may add additional personnel with authority to approve support requests by contacting the EA project manager.

2. The WSUS portion of the scope only applies to the new Hybrid DCS SCADA Servers and VMs

3. The Authority’s SCADA test platform is located at EA’s office in Irvine, CA

4. In some cases, EA may recommend a partial list of SCADA computers to update, typically because ongoing project work on the test platform prevents the proper testing procedure. This will be explained in all reports sent to the Authority’s IS

5. The Authority’s IS is responsible for installing updates, firmware, remediation on the production SCADA computers

6. The scope does not include time to troubleshoot extended problems, should a significant issue arise, EA will work with the Authority management and the Authority’s IS to resolve the issue using an alternate source of funding

4 Cost Estimate The tasks to be performed along with the estimated time to complete the tasks are detailed in the attached cost estimate (Appendix A).

4.1 Materials Budget has been included for EA to procure the annual software support items. These items are in the attached cost estimate (Appendix A).

4.2 Travel All travel is billed at cost according to the U.S. General Services Administration (GSA) for hotel and per diem rates and the IRS standard mileage rate as of 7/1/2020.

15-13

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 11 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

5 Terms & Conditions Terms and conditions are as per the following contract dated October 25th, 2017:

PROFESSIONAL SERVICES AGREEMENT

BETWEEN ENCINA WASTEWATER AUTHORITY

AND ENTERPRISE AUTOMATION

FOR AS-NEEDED PROFESSIONAL SERVICES FOR

SCADA SYSTEM INTEGRATION AND SUPPORT

6 Conclusion I welcome any further discussion that may facilitate the refinement of this scope of work. Please contact me at (949) 769-6000 or alternatively on my cell phone at (702) 497-4505 with any questions.

Submitted by

Luke Stephenson

15-14

Enterprise Automation 210 Goddard Irvine CA 92618 USA Tel 949-769-6000 Fax 949-769-6005 www.eaintegrator.com

Customer: Encina Wastewater Authority Effective Date: 7/1/2020 Revision: 1.0.0 Page Number: 12 of 12 Filename: EA20EWA063 SCOPE FY2021 Annual Support 2.0.0.docx

Appendix A: Cost Estimate Details

15-15

Clie

nt:

En

cin

aP

roje

ct:

F

Y20

21 A

nn

ual

Su

pp

ort

Num

ber:

EA

20E

WA

063

D

ate:

7/1

/202

0

Rev

isio

n: 1

.0.0

A

utho

r: M

M

Rev

iew

ed B

y: L

S

Su

mm

ary

Pro

ject

En

g.

Le

ad

En

g.

PM

Arc

hite

ctP

roje

ct E

ng

.L

ea

d E

ng

.P

MA

rch

itect

Ho

urs

Pri

ce

EN

G O

n C

all S

uppo

rt60

2420

016

1610

014

6$3

2,18

0E

NG

WS

US

Upd

ates

503

80

00

00

61$1

2,87

5E

NG

SC

AD

A T

rain

ing

3612

90

012

00

69$1

5,18

0E

NG

CR

s10

690

290

00

00

225

$49,

840

En

gin

eeri

ng

Lab

or

To

tals

252

129

660

1628

100

501

$110

,075

Exp

ense

sP

rice

$49,

420

$513

To

tal E

xpen

ses

$49,

932

Gra

nd

To

tal

$160

,007

To

tals

Ou

t o

f O

ffic

eE

ng

inee

rin

g L

abo

r

TR

V T

rave

l

#In

Off

ice

MA

T S

oftw

are

Sup

port

EA

20E

WA

063

ES

TIM

AT

E F

Y20

21 A

nnua

l Sup

port

1.0

.0.x

lsm

Sum

mar

y1

of 7

15-16

Clie

nt:

E

nci

na

Pro

ject

: F

Y20

21 A

nn

ual

Su

pp

ort

Num

ber:

EA

20E

WA

063

D

ate:

7/1

/202

0

Rev

isio

n: 1

.0.0

A

utho

r: M

M

Rev

iew

ed B

y: L

S

Pro

ject

En

g.

Le

ad

En

g.

PM

Arc

hite

ctP

roje

ct E

ng

.L

ea

d E

ng

.P

MA

rch

itect

65

0O

n c

all s

up

po

rt14

6$3

2,18

0ph

one

calls

, tec

hnic

al in

vest

igat

ions

, ons

ite s

uppo

rt60

2420

1616

10<

incl

udes

pro

ject

man

agem

ent a

s ne

eded

to h

andl

e su

ppor

t>an

nual

pla

nnin

g m

eetin

gsad

-hoc

mee

tings

Ho

urs

6024

200

1616

100

146

Pri

ce$1

2,30

0$5

,640

$4,8

00$0

$3,2

80$3

,760

$2,4

00$0

$32,

180

WB

SD

esc

riptio

nH

ou

rsP

rice

On

Cal

l Su

pp

ort

En

gin

eeri

ng

Lab

or

In O

ffic

eO

ut

of

Off

ice

To

tals

EA

20E

WA

063

ES

TIM

AT

E F

Y20

21 A

nnua

l Sup

port

1.0

.0.x

lsm

EN

G O

n C

all S

uppo

rt2

of 7

15-17

Clie

nt:

E

nci

na

Pro

ject

: F

Y20

21 A

nn

ual

Su

pp

ort

Num

ber:

EA

20E

WA

063

D

ate:

7/1

/202

0

Rev

isio

n: 1

.0.0

A

utho

r: M

M

Rev

iew

ed B

y: L

S

Pro

ject

En

g.

Le

ad

En

g.

PM

Arc

hite

ctP

roje

ct E

ng

.L

ea

d E

ng

.P

MA

rch

itect

23

0W

SU

S u

pd

ates

an

d p

latf

orm

mai

nte

nan

ce53

$10,

955

upda

tes

inst

alla

tion

24up

date

s re

port

to E

WA

IS8

plat

form

test

pla

tfor

m b

acku

ps10

test

pla

form

rem

edia

tion

and

firm

war

e up

date

s8

3

Pro

ject

man

agem

ent

8$1

,920

99

0co

ordi

natio

n, p

roje

ct m

anag

emen

t, ov

erhe

ad, m

eetin

gs8

Ho

urs

503

80

00

00

61

Pri

ce$1

0,25

0$7

05$1

,920

$0$0

$0$0

$0$1

2,87

5

WB

SD

esc

riptio

nH

ou

rsP

rice

WS

US

Up

dat

esE

ng

inee

rin

g L

abo

rIn

Off

ice

Ou

t o

f O

ffic

eT

ota

ls

EA

20E

WA

063

ES

TIM

AT

E F

Y20

21 A

nnua

l Sup

port

1.0

.0.x

lsm

EN

G W

SU

S U

pdat

es3

of 7

15-18

Clie

nt:

E

nci

na

Pro

ject

: F

Y20

21 A

nn

ual

Su

pp

ort

Num

ber:

EA

20E

WA

063

D

ate:

7/1

/202

0

Rev

isio

n: 1

.0.0

A

utho

r: M

M

Rev

iew

ed B

y: L

S

Pro

ject

En

g.

Le

ad

En

g.

PM

Arc

hite

ctP

roje

ct E

ng

.L

ea

d E

ng

.P

MA

rch

itect

En

gin

eeri

ng

60$1

3,02

08

70

prep

are

trai

ning

man

uals

3612

87

0au

thor

ity s

taff

trai

ning

12

Pro

ject

man

agem

ent

9$2

,160

99

0co

ordi

natio

n, p

roje

ct m

anag

emen

t, ov

erhe

ad, m

eetin

gs9

Ho

urs

3612

90

012

00

69

Pri

ce$7

,380

$2,8

20$2

,160

$0$0

$2,8

20$0

$0$1

5,18

0

WB

SD

esc

riptio

nH

ou

rsP

rice

SC

AD

A T

rain

ing

En

gin

eeri

ng

Lab

or

In O

ffic

eO

ut

of

Off

ice

To

tals

EA

20E

WA

063

ES

TIM

AT

E F

Y20

21 A

nnua

l Sup

port

1.0

.0.x

lsm

EN

G S

CA

DA

Tra

inin

g4

of 7

15-19

Clie

nt:

E

nci

na

Pro

ject

: F

Y20

21 A

nn

ual

Su

pp

ort

Num

ber:

EA

20E

WA

063

D

ate:

7/1

/202

0

Rev

isio

n: 1

.0.0

A

utho

r: M

M

Rev

iew

ed B

y: L

S

Pro

ject

En

g.

Le

ad

En

g.

PM

Arc

hite

ctP

roje

ct E

ng

.L

ea

d E

ng

.P

MA

rch

itect

60

0S

CA

DA

CR

man

agem

ent

and

mai

nte

nan

ce19

6$4

2,88

0C

R m

anag

emen

t56

40as

-nee

ded

budg

et f

or C

Rs

5050

stan

dard

s m

odifi

catio

nsex

ecut

ion,

man

agem

ent

Pro

ject

man

agem

ent

29$6

,960

99

0co

ordi

natio

n, p

roje

ct m

anag

emen

t, ov

erhe

ad, m

eetin

gs29

Ho

urs

106

9029

00

00

022

5

Pri

ce$2

1,73

0$2

1,15

0$6

,960

$0$0

$0$0

$0$4

9,84

0

WB

SD

esc

riptio

nH

ou

rsP

rice

CR

sE

ng

inee

rin

g L

abo

rIn

Off

ice

Ou

t o

f O

ffic

eT

ota

ls

EA

20E

WA

063

ES

TIM

AT

E F

Y20

21 A

nnua

l Sup

port

1.0

.0.x

lsm

EN

G C

Rs

5 of

7

15-20

Cli

ent:

En

cin

aP

roje

ct:

F

Y20

21 A

nn

ual

Su

pp

ort

Num

ber:

EA

20E

WA

063

D

ate:

7/1

/202

0

Rev

isio

n: 1

.0.0

A

utho

r: M

M

Rev

iew

ed B

y: L

S

So

ftw

are

Su

pp

ort

To

tals

No.

Des

crip

tion

Man

ufac

ture

rP

art N

o.Q

ty.

Uni

t Cos

tE

xt. C

ost

Mar

kup

Uni

t Sel

lE

xt. S

ell

Pric

e

So

ftw

are

Su

pp

ort

$49,

420

1.S

chne

ider

HD

CS

Sup

port

, Gol

d Le

vel,

8x5

phon

e, s

oftw

are

upgr

ades

(18

mos

) -

Exp

12/

31/2

021

B&

KH

DC

S S

uppo

rt1

$20,

944

$20,

944

8%$2

2,62

0$2

2,62

02.

Cus

tom

er F

IRS

T #

1258

67 -

Sta

ndar

d -

Ren

ewal

- H

isto

rian

- E

xp 1

2/23

/202

1W

WC

AC

F-S

TA

ND

RD

-R-H

ST

1$2

2,50

0$2

2,50

08%

$24,

300

$24,

300

3.T

opV

iew

Sup

port

Ren

ewal

- E

xp 1

2/31

/202

1W

WC

AT

V-S

UP

T-R

1$9

26$9

268%

$1,0

00$1

,000

4.C

itect

Any

whe

re -

Cus

tom

er F

IRS

T #

7630

9 -

Sta

ndar

d Le

vel -

Ren

ewal

, Exp

1/3

1/20

22W

WC

AC

F-C

IT-1

0-70

01R

1$1

,389

$1,3

898%

$1,5

00$1

,500

Pri

ce$4

5,75

9$4

9,42

0

Bill

of

Mat

eria

lsS

ale

Info

rmat

ion

EA

20E

WA

063

ES

TIM

AT

E F

Y20

21 A

nnua

l Sup

port

1.0

.0.x

lsm

MA

T S

oftw

are

Sup

port

6 of

7

15-21

Clie

nt:

E

nci

na

Pro

ject

: F

Y20

21 A

nn

ual

Su

pp

ort

Num

ber:

EA

20E

WA

063

Dat

e: 7

/1/2

020

Rev

isio

n: 1

.0.0

Aut

hor:

MM

Rev

iew

ed B

y: L

S

On

Cal

l Su

pp

ort

Tra

vel (

as n

eed

ed)

$385

mile

age

to s

ite 1

(e.

g. E

A to

hot

el)

roun

d tr

ip, 1

10.5

mi.,

$0.

58/m

i.6

$64

$385

Tra

inin

g$1

28m

ileag

e to

site

1 (

e.g.

EA

to h

otel

)ro

und

trip

, 110

.5 m

i., $

0.58

/mi.

2$6

4$1

28

Pri

ce$5

13

Tra

vel

Des

crip

tion

Rat

e D

etai

lsQ

ty.

Uni

t Cos

tE

xt. C

ost

Pric

e

EA

20E

WA

063

ES

TIM

AT

E F

Y20

21 A

nnua

l Sup

port

1.0

.0.x

lsm

TR

V T

rave

l7

of 7

15-22

Ref: Admin. 20‐14172 

ENCINA WASTEWATER AUTHORITY 

BOARD OF DIRECTORS 

Item   :  16 

Date  :  July 22, 2020 

To  :  Honorable Chair and Board of Directors 

From  :  Michael Steinlicht, General Manager 

Issue    :  RESOLUTION 2020‐04 APPROPRIATING FUNDS FOR FISCAL YEAR 2021 PENSION 

POLICY, OPERATING AND CAPITAL PROGRAM BUDGETS AND ESTABLISHING 

CONTROLS THEREON 

STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

1. Adopt Resolution No. 2020‐04 appropriating funds for Fiscal Year 2021 Pension Policy, Operating

and Capital Program Budgets and establishing controls thereon.

2. Discuss and take other action as appropriate.

BACKGROUND 

On April 22, 2020, the Board of Directors approved the Fiscal Year 2021 Pension Policy, Operating and 

Capital Program Budgets  and  forwarded  said budgets  to  the  Encina  Joint Advisory Committee which 

recommended that the Boards and Councils of the Encina Member Agencies approve the budgets.  Each 

of the Member Agencies has approved the budgets  in conformance with Section 13.1.2 of the Revised 

Basic Agreement (Attachment 3).  Adoption of the proposed resolution (Attachment 2) will appropriate 

and authorize expenditure of $4,096,100  in pension policy  funds, $19,173,359  in operating  funds and 

$24,249,023 in capital funds for the fiscal year ending June 30, 2021 as estimated in the Fiscal Year 2021 

budget document. 

FIVE‐YEAR STRATEGIC BUSINESS PLAN REFERENCE 

Tactical  Goal  No.  2020‐SI‐6‐5  requires  EWA  to  prepare  and  complete  the  annual  Appropriations 

Resolution in completing the Fiscal Year 2021 Operating and Capital Budget process. 

DISCUSSION 

Resolution 2020‐04, as proposed, accomplishes the following:

1. Appropriates $4,096,100 in pension policy funds, $19,173,359 in operating funds and $24,249,023

in capital funds for the fiscal year ending June 30, 2021 as authorized by the Boards and Councils

of the Encina Member Agencies.

2. Estimates $4,096,100 in Member Agency pension funding policy revenue.

3. Estimates  $18,211,359  in  Member  Agency  operating  revenue,  $962,000  in  other  operating

revenue, and total operating revenue of $19,173,359.

16-1

July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors 

Resolution Appropriating Funds for Fiscal Year 2021 

  Ref: Admin. 20‐14172 

4. Estimates $24,249,023 Member Agency capital program revenue. 

5. Authorizes expenditure of appropriated and budgeted funds subject to a $50,000 per transaction 

limit and all other controls established in the proposed Resolution. 

6. Limits full‐time equivalent positions to seventy‐one (71) and authorizes the General Manager to 

hire temporary or part‐time staff within the aggregate Operating and Capital Program expense 

budget. The Board of Directors can adjust staffing at its discretion.  

7. Authorizes the General Manager to approve transfers of budgeted funds up to $50,000 and make 

transfers for purpose of administratively consolidating accounts. 

8. Authorizes the General Manager to approve change orders to contracts and agreements up to 

$50,000 subject to an aggregate limit of $100,000 on any particular contract or agreement.   

9. Authorizes  the General Manager  to execute contracts  for continuing  services provided  the FY 

2021 Operating or Capital Budget includes the underlying appropriation. 

10. Authorizes,  subject  to Board of Directors approval, expenditures necessary  to  reconstruct  the 

Joint System in an emergency. 

11. Carries forward budgeted and unexpended prior year Capital Improvements appropriations. 

12. Carries  forward budgeted  and unexpended prior  year Capital Program  appropriations  for  the 

following incomplete Planned Asset Replacement or Capital Acquisitions: 

 

 

13. Identifies  appropriate  Capital  Reserve  amount  established  by  the  Financial  Reserve  Policy 

Resolution. 

14. Authorizes  the  General  Manager  to  delegate  authority  given  to  him  by  the  Appropriation 

Resolution. 

MEMBER AGENCY MANAGER REVIEW 

The Member Agency Managers were briefed on this item in their July meeting and provided their support.  

COMMITTEE REVIEW 

The  Policy  &  Finance  Committee  reviewed  this  item  in  their  July  meeting  and  approved  staff’s 

recommendation.   Director Sullivan asked whether EWA’s purchasing and budget transfer threshold of 

$50,000 needs to be revisited.  General Manager Steinlicht stated staff examined this concern and found 

only a few items in recent years that were slightly above this threshold.  Staff aims to balance having the 

Account Description Balance

32002‐7750‐70890 BVPS ‐ Spare Pump 65,000$          

80002‐8050‐80860 EWPCF ‐ Primary Sedimentary Tank Parts 42,000            

80002‐8020‐80780 EWPCF ‐ DAF Pressurization Pump Rebuild 8,500              

115,500$        

16-2

July 22, 2020 Encina Wastewater Authority (EWA) Board of Directors 

Resolution Appropriating Funds for Fiscal Year 2021 

  Ref: Admin. 20‐14172 

appropriate level of control protocols with transparency and believes EWA should maintain the $50,000 

threshold for an additional year. 

Director Mosca asked whether EWA needs any additional internal controls in light of COVID‐19 causing 

more work  to  be  conducted  remotely.   Mr.  Spence  responded  stating  EWA’s  internal  controls  have 

consistently been ahead of the curve and EWA was prepared for work‐from‐home initiatives due to the 

fact that EWA transitioned years ago to a paperless, digitized workflow to document, review, and approve 

financial transactions.  EWA’s independent auditors have tested these procedures in the past and have 

praised the internal control environment.  Staff invites further recommendations for improvement each 

year though.  

FISCAL IMPACT 

The recommendation appropriates and authorizes the Fiscal Year 2021 Pension Funding Policy Budget 

totaling $4,096,100, Operating Budget totaling $19,173,359 and Capital Program Budget of $24,249,023 

in addition to certain unexpended Fiscal Year 2020 appropriations consistent with the approved Budget 

document and the controls established by Resolution No. 2020‐04. 

THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

1. Adopt Resolution No. 2020‐04 appropriating funds for Fiscal Year 2021 Pension Policy, Operating 

and Capital Program Budgets and establishing controls thereon. 

2. Discuss and take other action as appropriate. 

 Attachment 1:  Presentation Attachment 2:  Proposed Resolution 2020‐04 Appropriating Funds for Fiscal Year 2021 Pension Policy, Operating 

& Capital Program Budgets and Establishing Controls Thereon Attachment 3:  Member Agency Budget Adoption Resolutions   Prepared by:  Joseph Spence, Assistant to the General Manager    Reviewed by:  LeeAnn Warchol, Director of Administrative Services/Treasurer/Auditor Reviewed by:  Scott McClelland, Assistant General Manager Approved by:  Michael Steinlicht, General Manager  

16-3

ATTACHMENT  1 

PRESENTATION 

July 22, 2020 

16-4

Resolution 2020-04Appropriating Funds for Fiscal Year 2021 Pension Policy, Operating and Capital Program Budgets and Establishing Controls Thereon

BOARD OF DIRECTORS7/22/2020

16-5

STAFF RECOMMENDS THE BOARD OF DIRECTORS:

1. Adopt Resolution No. 2020‐04 appropriating funds for Fiscal Year 2021Pension Policy, Operating and Capital Program Budgets and establishingcontrols thereon.

2. Discuss and take other action as appropriate.

Resolution 2020-04: Appropriating FY2021

16-6

Background

• Appropriations Resolution is final step of budgetimplementation process

• Establishes control parameters around the funds

• FY2021 Budget approved by Board of Directors andJoint Advisory Committee (April 22nd)

• Budget approved by each Member Agency (May-June)

Resolution 2020-04: Appropriating FY2021

16-7

Proposed Resolution 2020-04

1. Appropriates $4,096,100 in pension policy funds, $19,173,359 in operating funds and $24,249,023 in capital funds for the fiscal year ending June 30, 2021 as authorized by the Boards and Councils of the Encina Member Agencies.

2. Estimates $4,096,100 in Member Agency pension funding policy revenue.

3. Estimates $18,211,359 in Member Agency operating revenue, $962,000 in other operating revenue, and total operating revenue of $19,173,359.

Resolution 2020-04: Appropriating FY2021

16-8

Proposed Resolution 2020-04

4. Estimates $24,249,023 Member Agency capital program revenue.

5. Authorizes expenditure of appropriated and budgeted funds subject toa $50,000 per transaction limit and all other controls established in theproposed Resolution.

6. Limits full‐time equivalent positions to seventy‐one (71) and authorizesthe General Manager to hire temporary or part‐time staff within theaggregate Operating and Capital Program expense budget. The Boardof Directors can adjust staffing at its discretion.

Resolution 2020-04: Appropriating FY2021

16-9

Proposed Resolution 2020-04

7. Authorizes the General Manager to approve transfers of budgetedfunds up to $50,000 and make transfers for the purpose ofadministratively consolidating accounts.

8. Authorizes the General Manager to approve change orders to contractsand agreements up to $50,000 subject to an aggregate limit of$100,000 on any particular contract or agreement.

9. Authorizes the General Manager to execute contracts for continuingservices provided the FY 2021 Operating or Capital Budget includes theunderlying appropriation.

Resolution 2020-04: Appropriating FY2021

16-10

Proposed Resolution 2020-04

10. Authorizes, subject to Board of Directors approval, expendituresnecessary to reconstruct the Joint System in an emergency.

11. Carries forward budgeted and unexpended prior year CapitalImprovements appropriations.

Resolution 2020-04: Appropriating FY2021

16-11

Proposed Resolution 2020-04

12. Carries forward budgeted and unexpended prior year Capital Programappropriations for the following incomplete Planned AssetReplacement or Capital Acquisitions:

Resolution 2020-04: Appropriating FY2021

Account Description Balance

32002‐7750‐70890 BVPS ‐ Spare Pump 65,000$          80002‐8050‐80860 EWPCF ‐ Primary Sedimentary Tank Parts 42,000            

80002‐8020‐80780 EWPCF ‐ DAF Pressurization Pump Rebuild 8,500              

115,500$        

16-12

Proposed Resolution 2020-04

13. Identifies appropriate Capital Reserve amount established by theFinancial Reserve Policy Resolution.

14. Authorizes the General Manager to delegate authority given to him bythe Appropriation Resolution.

Resolution 2020-04: Appropriating FY2021

Financial Reserve  Balance Operating Reserve 2,750,000$        Remote Facilities Reserve 250,000              

Inventory Reserve 1,300,000          

Capital Reserve 8,100,000          

12,400,000$     

16-13

THEREFORE, STAFF RECOMMENDS BOARD OF DIRECTORS:

1. Adopt Resolution No. 2020‐04 appropriating funds for Fiscal Year 2021Pension Policy, Operating and Capital Program Budgets and establishingcontrols thereon.

2. Discuss and take other action as appropriate.

Resolution 2020-04: Appropriating FY2021

16-14

ATTACHMENT 2 

PROPOSED RESOLUTION 2020‐04 APPROPRIATING FUNDS FOR FISCAL YEAR 2021 PENSION POLICY, OPERATING & CAPITAL PROGRAM 

BUDGETS AND ESTABLISHING CONTROLS THERON 

July 22, 2020 

16-15

RESOLUTION No. 2020‐04 

A RESOLUTION OF THE BOARD OF DIRECTORS OF THE ENCINA WASTEWATER AUTHORITY APPROPRIATING FUNDS FOR FISCAL YEAR 2021 PENSION POLICY, OPERATING AND CAPITAL 

PROGRAM BUDGETS AND ESTABLISHING CONTROLS THEREON 

Ref: Admin. 20‐14151b 

WHEREAS,  the Revised Basic Agreement and Revised Establishment Document governing  the 

administration of the Encina Wastewater Authority (Authority) require the preparation and approval of 

Estimated Operating and Capital Program budgets on an annual basis; and, 

WHEREAS,  the  Authority’s  Fiscal  Year  2021  Pension  Policy,  Operating  and  Capital  Program 

Budgets were approved by the Authority’s Board of Directors and the Encina Joint Advisory Committee 

on April 22, 2020; and, 

WHEREAS, the Authority has received certified copies of approving resolutions or minute orders 

from the governing bodies of each of the Member Agencies confirming their approval of the Authority’s 

Fiscal Year 2021 Pension Policy, Operating and Capital Program Budgets as required by the Revised Basic 

Agreement. 

NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Encina Wastewater Authority 

as follows: 

Section 1.  Pension  Policy  funds  totaling  $4,096,100,  Operations,  Maintenance,  and 

Administration Program funds totaling $19,173,359 and Capital Program funds totaling $24,249,023 are 

hereby appropriated for Fiscal Year 2021. 

Section 2.  Estimated  Member  Agency  Pension  Policy  revenues  of  $4,096,100  are  hereby 

appropriated for Fiscal Year 2021. 

Section  3.    Estimated Member  Agency Operating  revenues  of  $18,211,359, Other  Operating 

revenues of $962,000, and total Operating revenues of $19,173,359 are hereby appropriated for Fiscal 

Year 2021. 

Section 4.  Estimated  Member  Agency  Capital  Program  revenues  totaling  $24,249,023  are 

hereby appropriated for Fiscal Year 2021. 

Section 5.  Subject  to  a  $50,000  single  transaction  limit  and  as modified by other  applicable 

controls established herein, the General Manager is hereby authorized to expend appropriated funds in 

accordance with the Authority’s Fiscal Year 2021 Operating and Capital Program Budgets. 16-16

EWA Board of Directors Resolution No. 2020‐04 Fiscal Year 2021 Budget Appropriation and Controls Resolution 

Ref: Admin. 20‐14151b 

Section 6.  Seventy‐one (71) full‐time equivalent positions are authorized for Fiscal Year 2021. 

Only  the Board of Directors may authorize any  increase  in  the number of authorized positions.   The 

General Manager  is  hereby  authorized  to  hire  temporary  or  part‐time  staff  as  necessary, within  the 

aggregate Operating and Capital Program expense budget appropriations. 

Section 7.  The General Manager is hereby authorized to transfer funds between accounts within 

the Operating or Capital Program in an amount up to $50,000 per transfer.  Any transfer of funds from 

the Operating Program to the Capital Program, from the Capital Program to the Operating Program, or, in 

excess of $50,000, must be approved by the Board of Directors.  Any transfer of funds between identical 

project codes for the purpose of consolidating accounts  is hereby authorized and  is not subject to the 

transfer limit. 

Section 8.  Where  sufficient  budgeted  funds  are  available,  the  General  Manager  is  hereby 

authorized  to approve change orders on contracts and agreements provided, however,  that no single 

change order  shall  exceed  $50,000  and  that  the  aggregate  value of  change orders on  any particular 

contract or agreement shall not exceed $100,000.  The Board of Directors must approve all change orders 

exceeding these limits.    

Section 9.  The  General  Manager  is  authorized  to  execute  contracts  and  agreements  for 

appropriated  programs  between  the  Authority  and:  [a]  the  California  Sanitation  Risk  Management 

Authority for  insurance; [b] each and every contractor necessary to ensure continuous execution of all 

existing and subsequently effective employee retirement, health, and other employee welfare benefits as 

specified in Board of Directors approved labor agreement resolutions; [c] the California Public Employees’ 

Retiree Benefit Trust for continuous execution of the Irrevocable Trust as specified in Board of Directors 

approved resolutions; [d] Universal Protection Service L.P. or subsequently effective provider of onsite 

security patrol services; [e] ADS Environmental Services for flow metering services; [f] Prominent Systems 

Inc.  for  carbon  replacement within  the Odor Reduction Facilities;  [g] Procopio, Cory, Hargreaves, and 

Savitch for legal services; [h] Woodard & Curran for as needed engineering services; [i] Hawthorne Power 

Systems for engine overhaul maintenance services; [j] Parada Painting Inc. for as needed coating services; 

[k] Tyler Technologies for accounting support services; [l] Accounting Principles or subsequently effective 

provider of temporary staffing services; and, [m] White Nelson Diehl Evans LLP for professional financial 

management staff services.   

 

 

16-17

EWA Board of Directors Resolution No. 2020‐04 Fiscal Year 2021 Budget Appropriation and Controls Resolution 

Ref: Admin. 20‐14151b 

Section 10.  In an emergency, the General Manager is hereby authorized to expend those funds 

necessary  to  reconstruct,  or  cause  to  be  reconstructed,  any  portion  of  the  Joint  system  when 

reconstruction  is  immediately  required  to permit  the  Joint System  to continue  to  function.   Any  such 

expenditure must be approved by the Board of Directors. 

Section 11. All funds budgeted for Capital Improvements remaining unexpended at June 30, 2020 

are hereby appropriated and budgeted for Fiscal Year 2021. 

Section 12. Funds budgeted and unexpended in Fiscal Year 2020 for the following Planned Asset 

Replacement or Capital Acquisition project are hereby appropriated and budgeted in Fiscal Year 2021: 

Section 13. The Financial Reserve amounts for Fiscal Year 2021 are established as follows: 

   

Section 14. The General Manager may delegate any authority granted pursuant to this resolution. 

 

 

 

 

 

 

 

 

Account Description Balance

32002‐7750‐70890 BVPS ‐ Spare Pump 65,000$          80002‐8050‐80860 EWPCF ‐ Primary Sedimentary Tank Parts 42,000            

80002‐8020‐80780 EWPCF ‐ DAF Pressurization Pump Rebuild 8,500              

115,500$        

Financial Reserve  Balance Operating Reserve 2,750,000$        Remote Facilities Reserve 250,000              

Inventory Reserve 1,300,000          

Capital Reserve 8,100,000          

12,400,000$     

16-18

EWA Board of Directors Resolution No. 2020‐04 Fiscal Year 2021 Budget Appropriation and Controls Resolution 

Ref: Admin. 20‐14151b 

  PASSED AND ADOPTED at a meeting of the Board of Directors of the Encina Wastewater Authority 

held July 22, 2020, by the following vote: 

Representative  Agency  Vote Chair Juliussen  Leucadia Wastewater District   

Vice Chair Blackburn  City of Carlsbad  Director Schumacher  City of Carlsbad  Director Rigby  City of Vista  Director Ritter  City of Vista  Director Rigby  Buena Sanitation District  Director Ritter  Buena Sanitation District  Director Blakespear  City of Encinitas  Director Mosca  City of Encinitas  Director Sullivan  Leucadia Wastewater District  Director Martin  Vallecitos Water District  Director Hernandez  Vallecitos Water District 

 

 

ATTEST: 

                             Chair Allan Juliussen            Michael Steinlicht Board of Directors             Board Secretary Encina Wastewater Authority          Encina Wastewater Authority   

16-19

ATTACHMENT 3 

MEMBER AGENCY BUDGET ADOPTION RESOLUTIONS 

July 22, 2020 

16-20

EXHIBIT 10

RESOLUTION NO. 2020-131

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,

CALIFORNIA, APPROVING THE CITY OF CARLSBAD'S SHARE OF THE

FISCAL YEAR 2020-21 OPERATING AND CAPITAL BUDGETS OF THE

ENCINA WASTEWATER AUTHORITY

WHEREAS, the City of Carlsbad is a Member Agency to the Encina Joint Powers

Agreement (the Encina Agreement) entered into on July 13, 1961, for the acquisition, construction,

ownership, operation and maintenance of the Encina Joint Sewer System; and

WHEREAS, the Encina Agreement requires approval for the budget of the Encina

Wastewater Authority (EWA) by the Member Agencies following the recommendation of the Joint

Advisory Committee (JAC); and

WHEREAS, the City Council of the City of Carlsbad desires to approve said budget and

provide for the payment of its share of such expenses in accordance with the allocation provided in

the Encina Agreement; and

WHEREAS, the Wastewater Fund is projected to have sufficient funds for the payments

as they become due.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,

California, as follows:

1. That the above recitations are true and correct.

2. That the City of Carlsbad's estimated share of the FY 2020-21 Operating Budget

of the EWA as approved by the JAC on April 22, 2020, in the amount of $4,145,972 for Wastewater

Plant Operations, $953,505 for Wastewater Plant Operations pension pay-down (year two of three),

$1,392,864 for the Carlsbad Water Recycling Facility Operations, and $256,601 for Carlsbad Water

Recycling Facility Operations pension pay-down (year two of three) is approved.

3. That the City of Carlsbad's estimated share of the FY 2020-21 Capital Budget of

June 23, 2020 Item #9 Page 117 of 124 16-21

16-22

16-23

16-24

16-25

16-26

16-27

16-28

16-29

16-30

16-31

16-32

16-33

16-34

16-35

Ref: Admin.20‐14168 

ENCINA WASTEWATER AUTHORITY 

BOARD OF DIRECTORS 

Item   :  17 

Date  :  July 22, 2020 

To  :  Honorable Chair and Board Members 

From  :  Michael Steinlicht, General Manager 

Issue    :  PRIMARY AREA IMPROVEMENTS PROJECT CHANGE ORDER  

STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

1. Authorize the General Manager to approve a Change Order to the construction contract between

the  Encina  Wastewater  Authority  with  Gateway  Pacific  Contractors,  Inc.  in  the  amount  of

$424,532.

2. Discuss and take other action as appropriate.

BACKGROUND 

On February 27, 2019, the Board of Directors awarded a contract to Gateway Pacific Contractors,  Inc. 

(Gateway) for the construction of the Primary Area  Improvements Project (PAIP). This project  includes 

upgrades and rehabilitation of the existing grit and screenings facilities and process equipment located in 

the primary treatment area of the Encina Water Pollution Control Facility (EWPCF). The total cost of the 

proposed  Change  Order  exceeds  the  General Manager’s  authority  and  therefore  requires  Board  of 

Directors approval. 

FIVE‐YEAR STRATEGIC BUSINESS PLAN REFERENCE 

Strategic  Initiative  SI‐4‐9:  Complete  the  Primary  Area  Improvements  Projects  Phase  One  of  Three 

Equipment Installations.  

DISCUSSION 

On February 27, 2019, the Board of Directors awarded a contract to Gateway for the construction of the 

PAIP. The majority of the existing grit and screenings facilities were constructed and placed into service 

as  part  of  the  1982  Phase  III  Expansion  Project.  Additional  facilities  to  include  Grit  Tank  No.3, 

Sedimentation Tanks No.7 through No.10 and associated channels were subsequently constructed and 

placed in service as part of the 1992 Phase IV Expansion Project. The PAIP is a critical plant upgrade and 

improvements  construction  project  that  rehabilitates  the  aging  channels  and  structures,  upgrades 

preliminary treatment equipment, and replaces deteriorating electrical and control systems in the primary 

area. The Project is comprised of the following elements:  

Replacement of screening and grit handling equipment, including construction of a new Grit and

Screenings Annex.

17-1

 July 22, 2020 

Encina Wastewater Authority (EWA) Board of Directors  Primary Area Improvements Project Change Order 

 

Ref: Admin.20‐14168 

 

Repair,  rehabilitation,  and  replacement  of  aging  infrastructure  including  concrete  repair  and 

coatings of tanks and channels.  

Earthwork, grading, paving, yard piping, and construction of a new soil‐nailed retaining wall. 

Replacement of isolation gates throughout the primary area. 

Replacement of Motor Control Centers (MCC’s), replacement of conduit and wiring, and upgrades 

to the primary area instrumentation and control systems including integration into the plant‐wide  

Gateway  is  currently mobilized  on‐site  executing  this  scope  of  work  with  the  project  nearing  50% 

completion.  The  Change  Orders  to  date  includes  costs  related  to  several  changes  in  the  project 

construction  scope  resulting  from design modifications made due  to  field conditions  identified during 

construction.  These  items  include;  alternate  conduit  and  piping  system  routing  due  to  conflicts with 

existing  below  grade  utilities,  installation  of  waterproofing  over  the  masonry  block  finish  on  the 

Screenings Annex walls in lieu of the stucco finish as originally designed, increased height of the soil nail 

wall,  additional  effort  associated with  duct  bank  routing  based  on  existing  below  grade  utilities  and 

installation of a temporary potable water bypass while the soil nail wall was under construction. These 

and several other additional design enhancements  included  in the proposed Change Order ensure the 

operational  success of  the  facilities being  installed. The  contractor  is  currently working on  the  scope 

elements  that must be  completed during  the dry weather  season. These  include  the  replacement of 

isolation gates and rehabilitation of the concrete channels and tanks.  

Based on the age of the criticality of the facilities and the nature of the remaining scope elements the 

proposed  Change  Order  also  includes  an  allowance  in  the  amount  of  $250,000  to  be  utilized  for 

unforeseen conditions as they arise during construction. This allowance will provide the General Manager 

the  flexibility  to  authorize  additional  scope  based  on  field  conditions  and minimize  costly  delays  by 

allowing  construction  to  continue without  interruption.  This  scope  expansion would  be  reflected  as 

Change Order No. 4. Details of the PAIP financial performance are presented in the table below: 

Primary Area Improvements Project Fiscal Performance  

 Amount  Approval Authority  Comments  

Original Contract 

Award  $11,225,520  Board of Directors   

Change Order No.1   $32,771  

General Manager 

Changes in contractor scope to 

accommodate actual field conditions & 

design clarifications/enhancements 

Change Order No.2  $44,229  General Manager Change Annex from stucco finish to 

decorative masonry block finish 

Change Order No.3   $22,093  General Manager 

Changes in contractor scope to 

accommodate actual field conditions & 

design clarifications/enhancements 

17-2

 July 22, 2020 

Encina Wastewater Authority (EWA) Board of Directors  Primary Area Improvements Project Change Order 

 

Ref: Admin.20‐14168 

 

Proposed Change 

Order No.4 $424,532 

Board of Directors 

(pending) 

Changes in contractor scope to 

accommodate actual field conditions & 

design clarifications/enhancements 

Contract Value   $11,749,145   Sufficient appropriations exist in Capital 

Budget 

* Total Change Orders to date including proposed Change Order No.4 are approx. 4.66% of the original $11.2 million 

contract value.  

FISCAL IMPACT 

The fiscal impact of the proposed Change Order is $424,532 Sufficient appropriations are available in the 

FY 2021 Capital Budget to support this action.    

MEMBER AGENCY MANAGERS REVIEW 

Member Agency Managers were briefed on this item in their July meeting and provided their support.  

COMMITTEE REVIEW 

The  Capital  Improvement  Committee  reviewed  this  item  in  their  July meeting  and  approved  staff’s 

recommendation. 

THEREFORE, STAFF RECOMMENDS THE BOARD OF DIRECTORS: 

1. Authorize the General Manager to approve a Change Order to the construction contract between 

the  Encina  Wastewater  Authority  with  Gateway  Pacific  Contractors,  Inc.  in  the  amount  of 

$424,532. 

2. Discuss and take other action as appropriate. 

 Attachment 1:  Presentation  Attachment 2:  Primary Area Improvements Project Change Order No.4    Prepared by:  James Kearns, Capital Projects Manger 

Reviewed by:  Scott McClelland, Assistant General Manager 

Approved by:  Michael Steinlicht, General Manager 

17-3

 

17-4  

ATTACHMENT  1  

PRESENTATION       

            

 July 22, 2020 

 

Primary Area Improvements Project Change Order

B O A R D O F D I R EC T O R S 7 / 2 2 / 2 0 2 0

17-5

Recommendation

• Authorize the General Manager to approve a Change Order to the construction contract between the Encina Wastewater Authority and Gateway Pacific Contractors, Inc. in the amount of $424,532

• Discuss and take other action as appropriate

17-6

FIVE-YEAR STRATEGIC BUSINESS PLAN REFERENCE

Strategic Initiative No.4: “Improve Infrastructure Performance and Reliability ”

SI-4-9 Complete the Primary Area Improvements Projects Phase One of Three Equipment Installations

17-7

Primary Area Improvements Project (PAIP) - Background

Old Screenings Building

Screenings Building Equipment

• BOD Award Gateway Pacific Feb 2019

• Original Contract Value $11,225,520• Contract Duration – 730 Calendar

Days • 1982 Phase III Facilities (40 years old)

17-8

Project Scope 

• Barscreen replacement • Channel concrete repair & coatings• Grit Tank & Sedimentation Tank concrete

repair & coatings • Screenings conveyance & handling

equipment replacement • Construction of a new Grit & Screening

Annex • Grit & Sedimentation Tank Isolation gate

replacements• MCC Replacement• Building HVAC Improvements • SCADA Upgrades

Sed Tank Influent Channel

New Conduit Routing

17-9

Construction in Progress 

Sed Tank Influent Channel

New Isolation Gates

New Retaining Wall

New Screenings Annex

17-10

Primary Area Improvements Project Fiscal Performance

Amount Approval Authority Comments

Original Contract Award

$11,225,520 Board of Directors

Change Order No.1 $32,771General Manager

Changes in contractor scope to accommodate actual field conditions & design clarifications/enhancements

Change Order No.2 $44,229 General ManagerChange Annex from stucco finish to decorative masonry block finish

Change Order No.3 $22,093 General ManagerChanges in contractor scope to accommodate actual field conditions & design clarifications/enhancements

Proposed Change Order No.4

$424,532Board of Directors(pending)

Changes in contractor scope to accommodate actual field conditions & design clarifications/enhancements

Contract Value $11,749,145 Sufficient appropriations exist in Capital Budget

Total Change Orders to date including proposed Change Order No.4 are approx. 4.66% of theoriginal $11.2 million contract value

17-11

Fiscal Impact

• The fiscal impact of the proposed Change Order is $424,532 Sufficient appropriations are available in the FY 2021 Capital Budget to support this action

17-12

Recommendation

• Authorize the General Manager to approve a Change Order to the construction contract between the Encina Wastewater Authority and Gateway Pacific Contractors, Inc. in the amount of $424,532

• Discuss and take other action as appropriate

17-13

Questions

17-14

 

17-15  

ATTACHMENT  2  

PRIMARY AREA IMPROVEMENTS PROJECT CHANGE ORDER NO.4 

      

           

 July 22, 2020 

 

DATE OF CONTRACT: April 15, 2019PROJECT TITLE: Primary Area Improvements Project

TO CONTRACTOR: Gateway Pacific Contractors Inc.8055 Freeport Blvd.Sacramento, CA 95832

Item 1 is an ADD / DEDUCT / NO CHANGE in the amount of 12,653.83$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 2

Item 2 is an ADD / DEDUCT / NO CHANGE in the amount of 3,436.58$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 3

Item 3 is an ADD / DEDUCT / NO CHANGE in the amount of 7,821.42$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 4

Item 4 is an ADD / DEDUCT / NO CHANGE in the amount of 4,722.89$ and requires 0 calendar days ADDED / DEDUCTED

CHANGE ORDER FORM

DESCRIPTION: PCO #6 / RFI #32 – Wash Water Manifold Drains. Add piping for 3-inch drains from Huber Screening Wash Press Units. Drains were not shown on Bid Drawings and need to be connected to in slab under slab drain piping in the Grit and Screenings Annex Building.

DESCRIPTION: PCO #7 / Field Order #3 – Revised Door Lintel Steel Beam Detail. Change door lintel to concrete beam at Grit and Screenings Annex Building, Door DA-100A. Original door lintel was a steel beam that would have been exposed to view.

DESCRIPTION: PCO #10B / Field Order #7 – Delete Dumpster Lidding and Grit Screw Conveyor Modifications. Dumpster lidding system was deleted from scope due to potential operational challenges. Modifications to the Grit Screw Conveyor are required for leveling in the grit bin. Cost proposal included credit for the deleted equipment and additional cost for design changes.

DESCRIPTION: PCO #4 / RFI #29 – Temporary Water Bypass. Install temporary water line for 6-inch potable water line during construction of Soil Nail Wall. Existing pipeline alignment conflicted with Soil Nail Wall.

CHANGE ORDER NO. 4DATE: July 8, 2020

Ref: Admin.20-1416

When this change order has been approved by Encina Wastewater Authority, you are directed to make the following

changes under the Contract, subject to all Contract provisions.

ITEM 1

Page 1 of 517-16

ITEM 5

Item 5 is an ADD / DEDUCT / NO CHANGE in the amount of 17,065.81$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 6

Item 6 is an ADD / DEDUCT / NO CHANGE in the amount of 2,000.00$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 7

Item 7 is an ADD / DEDUCT / NO CHANGE in the amount of 10,113.00$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 8

Item 8 is an ADD / DEDUCT / NO CHANGE in the amount of 14,690.65$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 9

Item 9 is an ADD / DEDUCT / NO CHANGE in the amount of 9,014.25$ and requires 0 calendar days ADDED / DEDUCTED

DESCRIPTION: PCO #20A / Field Order #5 – FRP Ducting in Screening Building. Modify FRP ducting by adding offsets. Changes made to provide maximum clearance on the South side of the Existing Screenings Building between the new Mezzanine level steel framing and FRP foul air ducts.

DESCRIPTION: PCO #13 – Change All Handrail to Aluminum. Change handrail from galvanized steel to an aluminum three-rail system to match existing. Also, change Mezzanine handrail to removable and add cable guard railing to Soil Nail Wall.

DESCRIPTION: PCO #17 / Field Order #6 – Annex Building Under lab Pipe Encasement. Add concrete encasement for under slab drain piping at the Grit and Screenings Annex Building. Bid Addendum was unclear about encasement. Additional work was performed and tracked on time and materials.

DESCRIPTION: PCO #16 / RFI #24 – Counterfort Wall Widening. Grit and Screenings Building Annex Building foundation concrete walls needed widening to account for rebar clearance. Additional cost is for rebar subcontractor work without General Contractor markup.

DESCRIPTION: PCO #15 / RFI #25 – Modify Trench Drain in Annex Building. Change the trench drain to have stainless steel grating in lieu of fiberglass reinforced plastic. Bid addendum was not clear on trench drain construction.

Page 2 of 517-17

ITEM 10

Item 10 is an ADD / DEDUCT / NO CHANGE in the amount of 2,502.14$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 11

Item 11 is an ADD / DEDUCT / NO CHANGE in the amount of 5,289.47$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 12

Item 12 is an ADD / DEDUCT / NO CHANGE in the amount of 35,357.99$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 13

Item 13 is an ADD / DEDUCT / NO CHANGE in the amount of 11,939.42$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 14

Item 14 is an ADD / DEDUCT / NO CHANGE in the amount of 2,332.14$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 15

DESCRIPTION: PCO #26 – Electrical MH/HH Conduit Routing. Additional work on time and materials due to unforeseen conditions. Unforeseen existing underground duct banks required tunneling and air-lancing for the new duct banks near Electrical manhole and handholes MH-18 and HH-18.

DESCRIPTION: PCO #28 – Additional Rebar at Annex SOG. Additional work on time and materials for reinforcing steel added in the Grit and Screenings Annex Building slab on graded as directed by the Engineer and Inspector. Added reinforcing steel were provided as clarification to the Contract Drawing Details.

DESCRIPTION: PCO #30 / RFI #51 HDPE Pipe Cost. Changes to the HDPE grit piping routing and added insulation. Cost proposal includes credit for original pipe supports, additions for the new supports and insulation wrapping for the exposed HDPE pipe.

DESCRIPTION: PCO #31 / RFI #80 – Extend Soil Nail Wall. The Soil Nail Wall field dimensions were greater in height and width due to existing slope conditions differing from the Contract Drawings.

DESCRIPTION: PCO #34 / RFI #85 – Annex Building Structural Beam Bearing Plates and Masonry Rebar Interferences. Unforeseen conflict between the mezzanine and roof deck structural steel bearing plates and the masonry reinforcing. Steel bearing plates were field modified on time and materials to mitigate the conflict.

DESCRIPTION: PCO #40 / RFI #90 – Supply NEMA 6/7 Operator for Overhead Door. Changed the rating of the overhead door operators at the Grit and Screenings Annex Building due to classified area. Specifications for the door operator where not appropriate for the environment of Screenings Building.

Page 3 of 517-18

Item 15 is an ADD / DEDUCT / NO CHANGE in the amount of 11,234.86$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 16

Item 16 is an ADD / DEDUCT / NO CHANGE in the amount of 5,040.91$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 17

Item 17 is an ADD / DEDUCT / NO CHANGE in the amount of 5,000.00$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 18

Item 18 is an ADD / DEDUCT / NO CHANGE in the amount of 14,316.75$ and requires 0 calendar days ADDED / DEDUCTED

ITEM 19

Item 19 is an ADD / DEDUCT / NO CHANGE in the amount of 250,000.00$ and requires 0 calendar days ADDED / DEDUCTED

DESCRIPTION: PCO #46 – Annex Building Trolley Hoist. Proposal by Gateway Pacific to add a trolley hoist beam in the Grit and Screenings Annex Building. Cost for added beam is split between Gateway Pacific and EWA since Gateway Pacific will use the hoist during construction.

DESCRIPTION: PCO #53 – Waterproof Exterior Walls of Annex Building. Added a waterproof coated to the exterior of the Grit and Screening Annex Building. The recommendation to add waterproof coating was suggested by the masonry subcontractor due to the porous finish of the CMU. This recommendation was confirmed by CDM Smith and approved material was provided.

DESCRIPTION: Unforeseen Conditions Allowance - For this Item, payment will be by Force Account or Extra Work Procedures identified in GC-4 of the General Conditions, not to exceed the stipulated dollar amount shown

DESCRIPTION: PCO #44 / RFI #94 – Revise Checkered Plate Handles. Change checkered plate handle detail to match handles provided on previous Primary Effluent Conveyance Project as requested by EWA Operations.

Page 4 of 517-19

CONTRACT SUMMARY1. Original Contract sum 11,225,520.00$ 2. Net Change through previous Change Orders 99,093.31$ 3. Contract sum prior to this Change Order 11,324,613.31$ 4. Contract sum increased / decreased / unchanged by this Change Order 424,532.11$ 5. New Contract sum, including this Change Order 11,749,145.42$ 6. Contract time increased / decreased / unchanged by this Change Order 0 Calendar Days7. New date of completion of contract as of this Change Order June 4, 2021

Approvals:

1. Contractor By________________________________ Date:_____________________

2. Construction Manager By________________________________ Date:_____________________

3. EWA By________________________________ Date:_____________________

The above adjustments in time and cost include all compensation and adjustments for changes in sequence of work, equipment delivery, rescheduling, impact, and costs for extended overhead.

Page 5 of 517-20