KELLER ISD CITIZENS' BOND ADVISORY COMMITTEE
-
Upload
khangminh22 -
Category
Documents
-
view
0 -
download
0
Transcript of KELLER ISD CITIZENS' BOND ADVISORY COMMITTEE
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
BILLY KIDDDIRECTOR OF PROPERTY MANAGEMENT & GROUNDSKELLER ISD
INTRODUCTIONSINTRODUCTIONS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
AGENDAAGENDABOND PROPOSITION VALUE DISCUSSION Q&A
Q&A
PROJECT ESTIMATE STRUCTUREPROJECT SCOPE DESCRIPTIONS
NEXT MEETING STRUCTURE
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
CONSIDERATIONS
NON NEGOTIABLE
“There will be no increase in the Tax Rate”- Dr. Rick Westfall & KISD Board of Trustees
BOND PROPOSITION VALUEBOND PROPOSITION VALUE
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
• Deliberate Project Decisions
• Further Out Projects = More Unknowns
• LRFP is a Living Document
• All Stakeholders Involved in the Promise
CONSIDERATIONSBOND PROPOSITION VALUEBOND PROPOSITION VALUE
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
• Table Discussions
• Q&A
• Main Take Away from Tables
CONSIDERATIONSBOND PROPOSITION VALUEBOND PROPOSITION VALUE
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
OPINION OF PROBABLE COSTPROJECT ESTIMATE STRUCTUREPROJECT ESTIMATE STRUCTUREKeller Independent School District
Built: 1962 Orig., Roof Total Building Area SF: 144,597 OPINION OF PROBABLE COST
Construction CostCapital Improvements:
Site 354,160$ Exterior 223,300$ Interior 3,660,727$ Roofing -$ Security -$ Safety -$ Mechancial 2,622,000$ Electrical 2,148,350$ Plumbing 840,500$ Technology
Subtotal 6,598,855$
Additions and Renovations:Academic Addition 4,870 SF 225$ 1,095,750$ Academic Major Renovations 390 SF 150$ 58,500$ Academic Minor Renovations 6,320 SF 80$ 505,600$ Admin Minor Renovations 3,200 SF 80$ 256,000$ Fine Arts Addition 14,310 SF 250$ 3,577,500$ Fine Arts Major Renovations 2,606 SF 200$ 521,200$ Fine Arts Minor Renovations 2,260 SF 125$ 282,500$ Science Minor Renovations 3,300 SF 125$ 412,500$ Athletics Major Renovation 11,840 SF 200$ 2,368,000$ New Tennis Courts 4 EA 125,000$ 500,000$ Parking Addition 21,070 SF 8$ 168,560$
Subtotal 9,746,110$
Design Contingency 10.0% 974,611$ On-Site Contingency 10.0% 974,611$ Off-Site Construction Cost 5.0% 487,306$ Subtotal (CSP TOTAL) 18,781,492$
Contingency /AllowanceOwner's Betterment 2.0% 375,630$ Contractor's Contingency 2.0% 375,630$ Subtotal 751,260$
CONSTRUCTION TOTAL (GMP) 5/1/2017 19,532,752$
Keller Middle SchoolJune 25, 2019
Description 2019 Unit Cost BASELINE
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
OPINION OF PROBABLE COSTPROJECT ESTIMATE STRUCTUREPROJECT ESTIMATE STRUCTURE
Professional Fee Budget(Includes costs, fees, tests and studies required to satisfy all governing authorities and codes)
Subtotal 10% 1,953,275$
Fixtures, Furniture & Equipment (FF&E) 8% 887,708$
Technology 5$ SF 245,480$
TOTAL PROJECT COST | MAY 2019 6/1/2017 22,619,215$
Bid Project November 2020 Escalation @ 2 Years 25,414,950$
Site Survey, Subsurface Utility Engineering, Due Dilligence / Property Evaluation, Geotechnical Engineering, Architectural Engineering, TDLR / TAS / ADA Review and Inspection, Food Service Design, On-Site Civil Engineering, Material Testing, HVAC Test and Balance, Building Permit / Review and Inspections
Keller Independent School District
Built: 1962 Orig., Roof Total Building Area SF: 144,597 OPINION OF PROBABLE COST
Construction CostCapital Improvements:
Site 354,160$ Exterior 223,300$ Interior 3,660,727$ Roofing -$ Security -$ Safety -$ Mechancial 2,622,000$ Electrical 2,148,350$ Plumbing 840,500$ Technology
Subtotal 6,598,855$
Additions and Renovations:Academic Addition 4,870 SF 225$ 1,095,750$ Academic Major Renovations 390 SF 150$ 58,500$ Academic Minor Renovations 6,320 SF 80$ 505,600$ Admin Minor Renovations 3,200 SF 80$ 256,000$ Fine Arts Addition 14,310 SF 250$ 3,577,500$ Fine Arts Major Renovations 2,606 SF 200$ 521,200$ Fine Arts Minor Renovations 2,260 SF 125$ 282,500$ Science Minor Renovations 3,300 SF 125$ 412,500$ Athletics Major Renovation 11,840 SF 200$ 2,368,000$ New Tennis Courts 4 EA 125,000$ 500,000$ Parking Addition 21,070 SF 8$ 168,560$
Subtotal 9,746,110$
Design Contingency 10.0% 974,611$ On-Site Contingency 10.0% 974,611$ Off-Site Construction Cost 5.0% 487,306$ Subtotal (CSP TOTAL) 18,781,492$
Contingency /AllowanceOwner's Betterment 2.0% 375,630$ Contractor's Contingency 2.0% 375,630$ Subtotal 751,260$
CONSTRUCTION TOTAL (GMP) 5/1/2017 19,532,752$
Keller Middle SchoolJune 25, 2019
Description 2019 Unit Cost BASELINE
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
WHITLEY ROAD ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
BUILT: 1985FCI SCORE: 0.57EDUCATIONAL ADEQUACY SCORE: 1.90FUNCTIONAL/MAXIMUM CAPACITY: 594/660 students
Projected Enrollment 466 (19/20)478 (20/21)474 (21/22)491 (22/23)495 (23/24)496 (24/25)
SCOPE OF WORK:New Facility designed for 540 students
$32,328,758
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
WHITLEY ROAD ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
WHITLEY ROAD ELEMENTARY SCHOOL
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
WHITLEY ROAD ELEMENTARY SCHOOL
WHITLEY ROAD ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
WHITLEY ROAD ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
WHITLEY ROAD ELEMENTARY SCHOOL
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
WHITLEY ROAD ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
WHITLEY ROAD ELEMENTARY SCHOOL
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
WHITLEY ROAD ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
WHITLEY ROAD ELEMENTARY SCHOOL
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
FLORENCE ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:New Facility designed for 540 students
BUILT: 1975FCI SCORE: 0.45EDUCATIONAL ADEQUACY SCORE: 1.83FUNCTIONAL/MAXIMUM CAPACITY: 515/572 students
Projected Enrollment 471 (19/20)486 (20/21)485 (21/22)500 (22/23)504 (23/24)504 (24/25)
$30,091,373
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
FLORENCE ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
N
FLORENCE ELEMENTARY SCHOOL
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
FLORENCE ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
N
FLORENCE ELEMENTARY SCHOOL
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
DISTRICT-WIDE SAFETY & SECURITY UPGRADESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
• Raptor Scanner Upgrades
• Vestibule Check-In System
• Security Vestibule Rework
• Ballistic Film on Glazing at School Entrances
• Access Controls Expansion and Upgrades
• Additional Security Camera
• Classroom Intercom Upgrades
• Crisis / Counseling Suites in each feeder pattern
*Applies to every campus in the District except those being replaced at the top of the Priority List
SCOPE OF WORK
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PARKVIEW ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:New Facility designed for 600 students
BUILT: 1980FCI SCORE: 0.17EDUCATIONAL ADEQUACY SCORE: 1.17FUNCTIONAL/MAXIMUM CAPACITY: 614/682 students
Projected Enrollment 546 (19/20)548 (20/21)553 (21/22)570 (22/23)566 (23/24)565 (24/25)
$33,521,597
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEEN
PARKVIEW ELEMENTARY SCHOOL
PARKVIEW ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEEN
PARKVIEW ELEMENTARY SCHOOL
PARKVIEW ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEEN
PARKVIEW ELEMENTARY SCHOOL
PARKVIEW ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEEN
PARKVIEW ELEMENTARY SCHOOL
PARKVIEW ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEEN
PARKVIEW ELEMENTARY SCHOOL
PARKVIEW ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
HERITAGE ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:New Facility designed for 540 students
BUILT: 1987FCI SCORE: 0.43EDUCATIONAL ADEQUACY SCORE: 2.11FUNCTIONAL/MAXIMUM CAPACITY: 515/572 students
Projected Enrollment 474 (19/20)490 (20/21)493 (21/22)503 (22/23)506 (23/24)505 (24/25)
$30,091,373
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
N
HERITAGE ELEMENTARY SCHOOL
HERITAGE ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
HERITAGE ELEMENTARY SCHOOL
HERITAGE ESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
DISTRICT-WIDE MEP & LIFE SAFETY UPGRADES PKG 1PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
• HVAC System Replacement
• Primary Power equipment replacement
• Fire Alarm System replacement
• PA System replacement
Keller HS, Fossil Ridge HS, Bear Creek IS, Chisholm Trail IS, Willis Lane ES, North Riverside ES
SCOPE OF WORK
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
DISTRICT-WIDE TECHNOLOGY UPGRADESPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
• Cabling Infrastructure Replacement
• HVAC Upgrades/Additions in MDF and IDF Rooms
• MDF/IDF Room Renovations
• WAN Expansion
• Primary Power and UPS Upgrades
*Applies to every campus in the District except those being replaced at the top of the Priority List
SCOPE OF WORK
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
OPTION 1 KELLER MS ADD/RENO: ATH, FA, ADMINPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:Fine arts additions and renovations, athletics additions and renovations, administration renovations. All capital improvements.
BUILT: 1966FCI SCORE: 0.25EDUCATIONAL ADEQUACY SCORE: 1.89FUNCTIONAL/MAXIMUM CAPACITY: 1,094/1,250 students
Projected Enrollment 1,017 (19/20)1,021 (20/21)1,037 (21/22)998 (22/23)985 (23/24)998 (24/25)
$25,414,950
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
OPTION 1 KELLER MS ADD/RENO: ATH, FA, ADMINPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
LEVEL 1 - ADDITIONS
LEVEL 2 - ADDITIONS
CR
ScienceCR
T
Boys
Girls
Mech.
LifeSkillsLoungeCR CR
CR CR CR CR
ScienceLab
ScienceLab
Mech.
T TIDFWR
Prep
CR CR CR ScienceLab
ScienceCRCR CR CR CR
CRAVIDScienceCRCRScience
CR
Mech.
T
CRCRCRCRCRCRCR
Mech.
E
Jan.Office
Test
Off.
WRWRMDFSt.
Library
Stor. St. Cou. Cou.Cou.
Conf.Rec. CoolDown
S SPED PLC
SPED.Off.
Gymnasium
Boys Girls
T
Off.T
Off.
Storage
B
G LobbyMech.
Jan.
Cafeteria Platform
KitchenGymasium
GreenRoom
T
G
Theatre
ArtGT
Art
Dys. Dys.
Yearbook
ISTISS
Shop
St. Off
St.St.
B
GJ
Band
Off.
Ens.
Ens.
Lib. P
PP
PP
P E
TTS
WR/Lounge
AP APT
Clinic
Office
St.
AAAtt. Rec.
St.
Principal I.C.
Stor
age
CRCR
CR
ScienceCR CR Choir
CR CR CR
CR
CRScienceCR
ScienceCR
Mech. Mech.
B G
B G B G
Stor
age
Sec.
St. Kiln
St.
Stor.Diag.
B
SCALE: 0.4367" = 6' 0"
ENS.509 sf
TLT181 sf
CHOIR1,010 sf
OFF.152 sf
ML151 sf
RISER219 sf
ENS.591 sf
TLT181 sf
UNI.151 sf
1,093 sf
PERC502 sf
SMALL ENS.297 sf
CG ST.193 sf
SP71 sf
SP71 sf
SP71 sf
SP71 sf
SP71 sf
UNI.326 sf
RIS
ER13
3 sf
INS.
STO
R13
3 sf
BAND2,513 sf
OFF.150 sf
ML246 sf
STOR151 sf
OFF.150 sf
OFF.150 sf
LP242 sf
LARGE ENS.502 sf
STOR.74 sf
STAGE3,814 sf
PROP STOR.604 sf
SCENE SHOP752 sf
SCENE STOR.303 sf
SHEL
L ST
OR
.20
3 sf
PIAN
O S
TOR
.15
5 sf
COSTUME STOR.223 sf
DRESSING301 sf
TOILET150 sf
CONTROL614 sf
9,321 sf
STAGE STOR.591 sf
ORCHESTRA
INS
SHARED OFF.
INS
CHOIRMAKERSPACE
LIBRARY
STOR.
WP
OFF.
D.LAB SCIENCELAB
SCIENCELAB
SCIENCELAB
PREP
YEARBOOK
SCIENCELAB
PRACTICE HALL
PCT
HA
LL
P. HALL
BAND
PRACTICE HALL
OPTION 1 KELLER MS ADD/RENO: ATH, FA, ADMINPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSNEW ADDITION
ROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
OPTION 2 KELLER MS FULL ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:Fine arts additions and renovations, athletics additions and renovations, administration renovations. All capital improvements. Academic additions and renovations.
BUILT: 1966FCI SCORE: 0.25EDUCATIONAL ADEQUACY SCORE: 1.89FUNCTIONAL/MAXIMUM CAPACITY: 1,094/1,250 students
Projected Enrollment 1,017 (19/20)1,021 (20/21)1,037 (21/22)998 (22/23)985 (23/24)998 (24/25)
$31,957,502
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
OPTION 2 KELLER MS FULL ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
LEVEL 1 - ADDITIONS
LEVEL 2 - ADDITIONS
CR
ScienceCR
T
Boys
Girls
Mech.
LifeSkillsLoungeCR CR
CR CR CR CR
ScienceLab
ScienceLab
Mech.
T TIDFWR
Prep
CR CR CR ScienceLab
ScienceCRCR CR CR CR
CRAVIDScienceCRCRScience
CR
Mech.
T
CRCRCRCRCRCRCR
Mech.
E
Jan.Office
Test
Off.
WRWRMDFSt.
Library
Stor. St. Cou. Cou.Cou.
Conf.Rec. CoolDown
S SPED PLC
SPED.Off.
Gymnasium
Boys Girls
T
Off.T
Off.
Storage
B
G LobbyMech.
Jan.
Cafeteria Platform
KitchenGymasium
GreenRoom
T
G
Theatre
ArtGT
Art
Dys. Dys.
Yearbook
ISTISS
Shop
St. Off
St.St.
B
GJ
Band
Off.
Ens.
Ens.
Lib. P
PP
PP
P E
TTS
WR/Lounge
AP APT
Clinic
Office
St.
AAAtt. Rec.
St.
Principal I.C.
Stor
age
CRCR
CR
ScienceCR CR Choir
CR CR CR
CR
CRScienceCR
ScienceCR
Mech. Mech.
B G
B G B G
Stor
age
Sec.
St. Kiln
St.
Stor.Diag.
B
SCALE: 0.4367" = 6' 0"
ENS.509 sf
TLT181 sf
CHOIR1,010 sf
OFF.152 sf
ML151 sf
RISER219 sf
ENS.591 sf
TLT181 sf
UNI.151 sf ORCHESTRA
INS
SHARED OFF.
INS
CHOIR
REC
MAKERSPACE
LIBRARY
STOR.
WP
OFF.
IMPACT
D.LAB
IMPACT
D.LAB EXC
HA
NG
E
D.LAB SCIENCELAB
CAFETERIACAFETERIA
STA
GE
EXT
CR
CR
CR
EXCHANGE EXCHANGE
SCIENCELAB
SCIENCELAB
PREP
ART WKRM& OFF.
ART
THEATERCR K
ILN
CR
CR
CR
EXCHANGE
YEARBOOK
EXCHANGE
SCIENCELAB
SCIENCELAB
PREP
PRACTICE HALL
PCT
HA
LL
P. HALL
OUTDOORCR
OU
TDO
OR
AR
T
BAND
PRACTICE HALL
COLORGUARD1,093 sf
PERC502 sf
SMALL ENS.297 sf
CG ST.193 sf
SP71 sf
SP71 sf
SP71 sf
SP71 sf
SP71 sf
UNI.326 sf
RIS
ER13
3 sf
INS.
STO
R13
3 sf
BAND2,513 sf
OFF.150 sf
ML246 sf
STOR151 sf
OFF.150 sf
OFF.150 sf
LP242 sf
LARGE ENS.502 sf
STOR.74 sf
STAGE3,814 sf
PROP STOR.604 sf
SCENE SHOP752 sf
SCENE STOR.303 sf
SHEL
L ST
OR
.20
3 sf
PIAN
O S
TOR
.15
5 sf
COSTUME STOR.223 sf
DRESSING301 sf
TOILET150 sf
CONTROL614 sf
9,321 sf
STAGE STOR.591 sf
BAND
PRACTICE HALL
OPTION 2 KELLER MS FULL ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSNEW ADDITION
ROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
OPTION 1 FOSSIL HILL MS FINE ARTS ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:Fine arts additions and renovations, minor academic renovations, all capital improvements.
BUILT: 1987FCI SCORE: 0.28EDUCATIONAL ADEQUACY SCORE: 2.17FUNCTIONAL/MAXIMUM CAPACITY: 937/1,071 students
Projected Enrollment 863 (19/20)915 (20/21)919 (21/22)838 (22/23)824 (23/24)828 (24/25)
$18,321,041
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
OPTION 1 FOSSIL HILL MS FINE ARTS ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
Cafetorium
Platform
Band
St.
Kitchen
P
B
G
Art
Mech.
Kiln
St.
P
P
Perc. Off.
Off.
Lib.
Choir
LoungeSt.
Jan.
Mech.
Library
Off.
CR
TCR
CR
CR
CR
CR
ScienceLab
ScienceLab
ScienceLab
ScienceLab
Prep
CR
CR
CR
CR
CR
CR
CR
CR
CR
ScienceCR
CR
CRAVIDTheatre
CR
ISTDys.
Dys.Mech.Off.
TechOff.
TMJ
M
T
BG
CR
CR
CR
CR
Quest
CR
QuestCR
CR
CRIST
CR
ESL
CR
CR
Resource
Gymnasium
Off.T
Stor.
GirlsPE
BoysAthletics
Laund.
WeightRoomSt.
CTE
Off.T
St. St.
GirlsAthletics
Con. St. Test
M
BoysPE
St.St.
Rec.
Clinic
Off. T J Prin. Test AP
C
S
AP
Book
s
APDiag.IC
Att.
WRTTCC
Conf. S AA
(Two courts)
CIS
SCALE: 0.3947" = 6' 0"
990 sf
ENS.503 sfUNI STOR
273 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
BAND2,439 sf
PERCUSION487 sf
LARGE ENS.487 sf
SMALL ENS.301 sf
UNI STOR305 sf
OFF.148 sf
OFF.148 sf
OFF.148 sf
ML158 sf
STOR161 sf
BAND
PRA
CTI
CE
RO
OM
S
UNI
TOILET
ENS
TOILET
COLORGUARD
SCIENCELAB
LIBRARY
MAKERSPACE
OFF.
WR.
TECH
ST.
ST.TT OFF. ST.
DYS.
DYS.
CHOIR
CO
RR
IDO
R
CO
RR
IDO
R
CIS
8,024 sf5,616 sf
1,389 sf
CR CR
CRCR
BANDPR
AC
TIC
ER
OO
MS
UNI
TOILET
ENS
TOILET
CHOIR
Platform
Band
St.P
Art
Mech.
Kiln
St.
P
P
Perc. Off.
Off.
Lib.
Choir
LoungeSt.
MSt.St.
OFF.OFF. ST.
ORCHESTRA
ML
INSTRUMENTSTORAGE
P P P P ENSE
MB
LE K
PS
ARTST.
ST.
STAGE EXT
PRACTHALL
OPTION 1 FOSSIL HILL MS FINE ARTS ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSNEW ADDITION
ROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
OPTION 2 FOSSIL HILL MS FULL ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:Fine arts additions and renovations, minor academic renovations, all capital improvements, new science lab additions and all academic additions and renovations.
BUILT: 1987FCI SCORE: 0.28EDUCATIONAL ADEQUACY SCORE: 2.17FUNCTIONAL/MAXIMUM CAPACITY: 937/1,071 students
Projected Enrollment 863 (19/20)915 (20/21)919 (21/22)838 (22/23)824 (23/24)828 (24/25)
$28,247,155
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS OPTION 2 FOSSIL HILL MS FULL ADD/RENO
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
Cafetorium
Platform
Band
St.
Kitchen
P
B
G
Art
Mech.
Kiln
St.
P
P
Perc. Off.
Off.
Lib.
Choir
LoungeSt.
Jan.
Mech.
Library
Off.
CR
TCR
CR
CR
CR
CR
ScienceLab
ScienceLab
ScienceLab
ScienceLab
Prep
CR
CR
CR
CR
CR
CR
CR
CR
CR
ScienceCR
CR
CRAVIDTheatre
CR
ISTDys.
Dys.Mech.Off.
TechOff.
TMJ
M
T
BG
CR
CR
CR
CR
Quest
CR
QuestCR
CR
CRIST
CR
ESL
CR
CR
Resource
Gymnasium
Off.T
Stor.
GirlsPE
BoysAthletics
Laund.
WeightRoomSt.
CTE
Off.T
St. St.
GirlsAthletics
Con. St. Test
M
BoysPE
St.St.
Rec.
Clinic
Off. T J Prin. Test AP
C
S
AP
Book
s
APDiag.IC
Att.
WRTTCC
Conf. S AA
(Two courts)
CIS
SCALE: 0.3947" = 6' 0"
990 sf
ENS.503 sfUNI STOR
273 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
SP68 sf
BAND2,439 sf
PERCUSION487 sf
LARGE ENS.487 sf
SMALL ENS.301 sf
UNI STOR305 sf
OFF.148 sf
OFF.148 sf
OFF.148 sf
ML158 sf
STOR161 sf
ENSEMBLE
SCIENCELAB
OFF.OFF. ST.
ORCHESTRA
ML
INSTRUMENTSTORAGE
P P P P ENSE
MB
LE K
PS
ARTST.
ST.
CR
CR CR
CR CR
SCIENCE LAB SCIENCE LAB
PREP
EXCHANGE
D.L
AB
IMPA
CT
STAGE EXT LIBRARY
MAKERSPACE
OFF.
WR.
TECH
ST.
ST.TT OFF. ST.
DYS.
DYS.
ST.TOILET
CSDL IMP
ART
SCIENCELAB
SCIENCELABPR
EP CR CR CR CR CR
OFF.
ST. ST.
EXC
HA
NG
E
EXC
HA
NG
E
CIS
OUTDOORCR
PREP
.
SCIENCELAB
ST.
CR CR
PRACTHALL
COLORGRD
CHOIRBAND BAND
ST.
8,024 sf5,616 sf
1,389 sf
BAND
PRA
CTI
CE
RO
OM
S
UNI
TOILET
ENS
TOILET
SCIENCELAB
CHOIR
PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS OPTION 2 FOSSIL HILL MS FULL ADD/RENO
NEW ADDITIONROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
CENTRAL HS PROJECT IPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:Fine arts additions and renovations, athletic additions and renovations, minor administration renovations, all capital improvements.
BUILT: 2003FCI SCORE: 0.15EDUCATIONAL ADEQUACY SCORE: 2.30FUNCTIONAL/MAXIMUM CAPACITY: 2,239/2,985 students
Projected Enrollment 2,574 (19/20)2,667 (20/21)2,702 (21/22)2,725 (22/23)2,735 (23/24)2,685 (24/25)
$ 46,999,698
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
CENTRAL HS PROJECT IPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
CENTRAL HS PROJECT IPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
CTECTEMech.
CTECTECTECTECTE
Mech.
Test/Off.
St.St.
St.AVID Off.AVID
CTE
AVID
CTE
St.
Ele.
STACCB GSt.Mech.
SPED SPEDSt.
TT ROTC
STACC
LifeSkillsCOREROTC
ROTC
ROTC
Book
Storage
S
Off.Off.Office
MConfConf
Cou.Cou.Cou.Cou.Cou.Off.
Reception
CareerCTR St.Lo
unge
J
Reg. Cou. Cou.
IDF
MSt.
TT
Lobby
CR
CR
CR
CR
CR
CR
Book
GCRCR
CR CR CR Mech.
Storage E IDF B DataT
T
T TClinic
Off.IDF
AP AP AP AP APConf.
St.
Rec.
Mech.
SPED KitchenCTEWR
Off.St.St.
CTE
CTE
G BSt.
Jan.
Rec.Att.
Sec.Prin.
Bus.
Peim
s
Storage Storage
St.
AP
BALCONY
SPED CORE
WR
WR
NEW ADDITIONROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
CENTRAL HS PROJECT IPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
OFF
.
ART
GAL
LER
Y
TH CR TH CR
TH CR TH CR
LAU
N.
STOR
STOR
RESTROOMCOMPUTER LAB
BLACK BOXINSTRUMENT
STORAGE
SM PR x10
LG PR
CONFL ENS
S EN
S
STO
R
OFF
.O
FF.
OFF
.O
FF.
OFF
.
OFF. STORMUS. LIB
NEW BAND HALL
UNIFORMSTOR
PERCUSSIONSTORAGE
PER
CU
SSIO
NEN
SAM
BLE
CO
LOR
GU
ARD
RO
OM
C.G
UAR
DST
OR
MAR
CH
ING
STO
R
ART
SHO
P
ART
S.ST
OR
WORKROOM
St. Kiln
St.
Art
Art
Art
St.
St.
Off.
Choir
Off.
Off.Off.
Off.
ColorGuard
Band
BlackBox
TheaterIDF
E
Off.St.
Off.
St.Ens.
TTSceneShop
StageSt.
St.T
G
B
Lobby
Theatre WRTechTheater
Off.
CTECTECTES
ArtArt
TEM
Mech.
Studio
GBCafeteriaKitchen
Mech.Mech.Mech.
Mech.M
PECR
CTEOff.Off.
GirlsPE
BoysPE
WeightRoom
Wrestling
Training
GymnasiumGymnasium
Off.St.
StorageE Laundry T
BoysAthletics
GirlsAthletics
CTRL
TKTS
St.
G
B
TMIDF
Cons.
Lobby
AuditoriumSt.
SceneShop
St. St.
St.
St.St.St.St.
St.
E
Off. Off. Off.
Cheer
St.
St.
Training
CONC.
TICKETBOOTH
MLUNIFORMIN
S ST
OR
STOR
PIANO
DANCE LKR
OFF.
CHEERLKR
DN
CE
ST
CH
EER
ST
OFF. M
STST
FAC
OU
RTY
AR
D
ART
COLORGUARD
STOR
BAND
BLACKBLOX
RESTROOM
COMPUTERLAB
THEATRE
LAU
N.
DA
NC
E / C
HEE
R
CONC. STOR
UNIFORMINS
STO
R.
OFFICE
ST.ST.
BALCONY
ARTART
CHOIRUNISTOR
ORCHESTRA DR
ESSI
NG
DR
ESSI
NG
ENS
COSTUMESTOR
SHELL STOR
CTE
STOR
(ABOVE)
DANCE / CHEER
ART
ARTSHOP
CAFE
NEWTHIRDGYM
OUTDOORCR
ATH
LETI
CST
OR
AG
E
NEW ADDITIONROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
FOSSIL RIDGE HS PROJECT IPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:Fine arts additions and renovations, athletic additions and renovations, CTE renovations and additions for PTEC Campus, all capital improvements.
BUILT: 1994FCI SCORE: 0.17EDUCATIONAL ADEQUACY SCORE: 2.63FUNCTIONAL/MAXIMUM CAPACITY: 2,361/3,149 students
Projected Enrollment 2,308 (19/20)2,312 (20/21)2,366 (21/22)2,477 (22/23)2,571 (23/24)2,568 (24/25)
$49,636,976
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
FOSSIL RIDGE HS PROJECT IPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
FOSSIL RIDGE HS PROJECT IPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
CRCR
CRCRCR
CRCR
CR
CRCR
CTE
CRCR
CRCR
CRCR
CRCR
CRCR
CRCR
CR
CR
CR
CRStorageMech.T TJ
E
Mech.B
G
CTE
CTE
CTE
CTE
CTEOff.St.
Test.
EM
Mech.B
G
IDFSt.
JLecture
AVIDCR
CR
Jan.Off.
Off.
Conf.
Inter.Off. Mech.
WRSt.
St.SPEDOff.
Diag.
SPED SPED
SPED
SPED
SPED
SPED SPED
SPED
CRCR
CTE
CTE
CTECTE
CTE
CTE
Mech.
Mech.
CTE
CRCR
CR
St.
St.St.
TSt.
St.St.
St.St.
Store
SPED
SpeechLSSPSt.
B
GET T J
T
T T
GB
CRCR
APAP
APRec.
Mech.
M
AP AP
APAP
TTT
T
St.
S
Clinic
Off.
Rec.Att.
St.WR
St.P
Sec.Bus.
SRO
S
TE
JBookRoom Comp.Lab
St. St.WR
Off.MDF
Testing
Testing TS
Library
CafeteriaKitchen
Auditorium
Stage
LoungeMechanical
Yearbook Theatre
Theatre
Theatre
St.S S S T
TJan.
St.
St.
Mech.
T
G B
T
Storage
StorageSt. St. St.
Shop
St. Off.
BlackBox
GB
Art
Art
ArtSt. St.
Kiln
ESt.IDF
Mech.
Band
Cheer
Percu
ssion
GB
P P P
PPP
St. St. Off.
St. CTE
Studio
Contr
ol
Choir
PPPP
St.Ens.Lib
rary
Off.
Off.Ens.
St.St.St.
ESt.
CTE
Art
St. St.
E Off. CTESt.
St.Off.
St.
Tkt.
Dance
Off.
GB
Off.
Libra
ry
J
Gymnasium AGymnasium BWrestling
CR Piano St. Off.TMESt.
Off.Off.T T
T
Off. Off.T
Off.
WeightRoom
Training
Train
ing
St. St.St. Laun
dry
St.
Off.T T
St.
Mech.
Conc.
St.
B G
B G G
St.
St.
SCALE: 0.324" = 6' 0"
OUT DOOR ART
STOR168 sf
DRAMAADD.
ART ADD.
BAND ADD.
PR.
CG STOR.
UNI. ST.
TB
BALCONY
(ABOVE)
CR
CRSTAIR
STAIR
INS.
STO
R. U
NI.
CO
LOR
GU
AR
D
ORCHESTRA
CO
NS. LO
BBY
CR
CR
DANCE /CHEER
WEIGHTROOM
WRESTLING
3RD GYM
NEW ADDITIONROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
FOSSIL RIDGE HS PROJECT IPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSComp.Lab
Comp.Lab
Comp.Lab CR CR CR CR CR
Mech.CTESci. LabCTE
CRSci.
Sci. Lab
Sci. Lab Sci. LabPrep.Prep.
CTE CRSci.
CRSci.
BG
E T T J
CDataReg.Int.
LoungeIDF
M ETT
T
CCCCConf.St.
Rec. MC
CRSci.
CRSci.
Mech.
GB
CR CR CR CR CR CR CR CRCRSci.
T T
CR CR CR
CRCRCR
St.
CR CRCR
SPED
BOOK
S
CR CR CR
Sci.
CRSci.
CRSci.
CRSci.
Sci. Lab
Sci. LabSci. Lab
Sci. LabPrep.
Prep.CRSci.
CRSci.
CR CR CR
CR
CR
CR
CR
WRMech. St.
WRWR
WR JIDF
SPED B G
JE TT
CTE
Comp.Lab CRSci. CR
Sci. CRSci.
CR
WR
St.
E
Mech.
B G
St.Off.Off.
Sci.CR
BALCONY
CR
STAIR
CRCR
CR
NEW ADDITIONROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PARK GLEN, LONE STAR, SHADY GROVE, KELLER-HARVEL ES ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:Classroom additions, new curriculum and instructional spaces, fine arts renovations, building maintenance upgrades.
BUILT: Park Glen: 1990 Lone Star: 2000Shady Grove: 1990Keller-Harvel: 1995
FCI SCORE: Park Glen: 0.24Lone Star: 0.26Shady Grove: 0.24Keller-Harvel: 0.19
EDUCATIONAL ADEQUACY SCORE: Park Glen: 2.13Lone Star: 2.80Shady Grove: 2.26Keller-Harvel: 2.18
PARK GLEN:$11,734,528
LONE STAR:$16,099,616
SHADY GROVE:$13,542,583
KELLER-HARVEL:$12,119,972
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PARK GLEN, LONESTAR, SHADY GROVE, KELLER-HARVILLE ES ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PARK GLEN, LONESTAR, SHADY GROVE, KELLER-HARVILLE ES ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
WR
K
K
1
1 1 2
2
Library Copy
Lounge
2
21 2
33 3K
K
4 4 4 4
4 44 ESL3
33Mech.
MM
E
IST
Book K Art
STACC STACC M
1
Theatre
St.
Mech.
Mech.
WROff.
St.
TT
Speech K 1
Coun.
TT
Sec.
AP
St.
ClinicRec.
Conf. Diag.
PLC
ComputerTT
MTest
Platform
Kitchen
Gymnasium
Girls
Boys
Office
St.
Off.
Mech.
MusicSt.
Jan.SPED
PTA
St.
Cafetorium
St.
St.
EJan.
St.
Resource
PTTSt.
St.
Storage
B
B G
G
St.
ESt.
St.
Mech.Mech.
1
1 2 ST.
K K DISCOVERY
3 3
ART ST RESTROOM
4 4 4
ESL
D.L
AB
IMPA
CT T
ST.
EXCHANCE
THEATER
EXCHANGE
T
3
D.L
AB
IMPA
CT
MAKERSPACE
2
2 EXCHANGE
T
T
STAGE EXT.
MUSIC
OUTDOORCR
NEW ADDITIONROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
INDOOR EXTRA CURRICULAR PROGRAM FACILITIES AT HIGH SCHOOLSPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
$48,626,734
SCOPE OF WORK:Indoor Extra Curricular Program Facilities at High Schools, includes restrooms, 100 yard turf field, equipment for all outdoor sports.
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS INDOOR EXTRA CURRICULAR PROGRAME FACILITIES AT HIGH SCHOOLS
CENTRAL HS
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS INDOOR EXTRA CURRICULAR PROGRAME FACILITIES AT HIGH SCHOOLS
FOSSIL RIDGE HS
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS INDOOR EXTRA CURRICULAR PROGRAME FACILITIES AT HIGH SCHOOLS
KELLER HS
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS INDOOR EXTRA CURRICULAR PROGRAME FACILITIES AT HIGH SCHOOLS
TIMBER CREEK HS
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
NEW AGRICULTURAL SCIENCE CENTERPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSDesign Concepts: The Ag Avengers
Site Plan
$21,509,217
SCOPE OF WORK:New Science Center programs with laboratory, shop and research space for agriscience programs, emerging technologies, transportation and logistics and trades such as construction, HVAC, electrical, plumbing, etc.
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
NEW ADULT TRANSITION CENTERPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS$17,634,819
SCOPE OF WORK:Additional instructional space to accommodate 9th and 10th grade studentSecure entry vestibule at the main entrance of New Direction High School and DAEP. Additional space to support special education and resource instructionAdditional counselor offices and conference rooms to meet with students and families
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
BEAR CREEK IS ACADEMIC ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
SCOPE OF WORK:New curriculum and instruction spaces, building maintenance upgrades.
BUILT: 1973FCI SCORE: 0.20EDUCATIONAL ADEQUACY SCORE: 2.05FUNCTIONAL/MAXIMUM CAPACITY: 943/1,078 students
Projected Enrollment 989 (19/20)963 (20/21)947 (21/22)963 (22/23)949 (23/24)954 (24/25)
$6,991,512
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
BEAR CREEK IS ACADEMIC ADD/RENOPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONSCR
G
B
Jan.
Kitchen
Cafeteria
CR
CR
CR
Coun.
Coun.
CR
CR CR WR CRSpeech
Resource
Res.
Library
St.
ScienceCR
TTOff.Lounge
IDF
Courtyard
G B
ISS CR CR
Coun.
Comp.
ScienceCR
ScienceCR
ComboSci. Lab
CR
St.
St.Off.
CR CR OT/PT CR CR CRESL St.
G
B
Jan.
Collab. Collab.
Collab. ScienceCR
ScienceCR
CR
B
G
SROE
ResourceS
S
Books
CR CR ScienceCR Collab.
Dys. Dys. GT
CR CR ScienceCR GT IST
IST
CR
CRScienceCR
T
TSLife
SkillsLife
Skills St.Jan.Jan.
T
TT
St.St.
CR CR
CR CRCR
B GJ
Gymnasium
BandO
St.Pra.PPPP
St.Off.Choir
Test
GymnasiumSt.
St.PlatformSt.
PLCSt. T T T S
AP AP
Conf.
Prin.Sec.
Att.WRCou.
Cou.T T
Rec.ClinicOff.M
E
Diag.
E
Dys.ComboSci. Lab
ComboSci. Lab
ComboSci. Lab
Art
Thea
tre
Off.
St.
St.
MAKERSPACE
DESIGN LAB
D.LAB
D.LAB
CRISIS SUITE
CR CROUTDOORCR
NEW ADDITIONROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS FREEDOM, HIDDEN LAKES, WILLIS LANE, N RIVERSIDE ES ADD/RENO
SCOPE OF WORK:Classroom additions, new curriculum and instructional spaces, fine arts renovations, building maintenance upgrades.
BUILT: Freedom: 2002 Hidden Lakes: 2001Willis Lane: 1998N Riverside: 1998
FCI SCORE: Freedom: 0.32 Hidden Lakes: 0.28Willis Lane: 0.26N Riverside: 0.24
EDUCATIONAL ADEQUACY SCORE: Freedom: 2.89 Hidden Lakes: 2.71Willis Lane: 2.88N Riverside: 2.85
FREEDOM:$17,117,828
HIDDEN LAKES:$11,112,192
WILLIS LANE:$5,333,874
N RIVERSIDE:$5,316,708
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS FREEDOM, HIDDEN LAKES, WILLIS LANE, N RIVERSIDE ES ADD/RENO
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
N
DEMO BUILDING
DEMO PAVING
NEW BUILDING
NEW PAVING
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS FREEDOM, HIDDEN LAKES, WILLIS LANE, N RIVERSIDE ES ADD/RENO
1
Lobby
Library
1
1
1
1
STARS
K K
DiscoveryK
MotorLab
LifeSkills
LifeSkills
Gymnasium
Cafetorium
Kitchen
ISTResource
LiteracyLibrary
Art
Music Platf
orm
Lounge
SpeechDys.
St. St.ESt. Cool
Down
WR
T TSt. St.
Kiln
G B
St.
IDF
St. T TJ
G B
St.
Off.
J
St.TTT
T
TT T
T
WR
Off.MDF
St.BooksJ
Science
2
2
22
Open
Open
ESLStorage
StorageSt.
GT444
4 ELM PTA4
VideoAnnoun.
Storage
3
3
Coun.
3 3
3
Coun.
G B
Coun.
Diag.CoolDown
TestE
J T
T
File
Conference AP P S
Rec.ClinicT
OfficeSt.
St.E
Mech.
TT T
T
TT
SCALE: 7.0482" = 95'-8"
IST CR
IMPA
CT
D.L
AB
EXCHANGET
D.L
AB
ST.
IMPA
CT
THIN
K
EXCHANGE
MAKERSPACE
LITLIBRARY
THEATER
PLA
TFO
RM
EXT.
DYS RESOURCE
2
2
2
2
NEW ADDITIONROOMS & SPACES
NEW ADDITIONCORRIDOR
RENOVATIONHEAVY
RENOVATIONLIGHT
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
CORRIDOREGRESS
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
DISTRICT-WIDE MEP & LIFE SAFETY UPGRADES PKG 2PROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
• HVAC System Replacement
• Primary Power equipment replacement
• Fire Alarm System replacement
• PA System replacement
Independence ES, Trinity Meadows IS, Bluebonnet ES, Woodland Springs ES, Friendship ES, Bette Perot ES, Trinity Springs MS
SCOPE OF WORK
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
SCHEDULEPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS2019 2022
J JF FM MA AM MJ JJ JA AS SO ON ND D
2020 20232021
DesignConstruction
2024
J JJ JF FF FM MM MA AA AM MM MJ JJ JJ JJ JA AA AS SS SO OO ON NN ND DD D
KELLER ISD 2019 BOND PROPOSITIONPROPOSED PHASING SCHEDULE
DISTRICT-WIDE TECHNOLOGY UPGRADES
DISTRICT-WIDE MEP AND LIFE SAFETY SYSTEM UPGRADES PACKAGE 1 - GROUP 2
PARKVIEW ES REPLACEMENT
WHITLEY ROAD ES REPLACEMENT
CENTRAL HS ADDITIONS AND RENOVATIONS
NORTH RIVERSIDE ES ADDITIONS AND RENOVATIONSDISTRICT-WIDE MEP AND LIFE SAFETY SYSTEMS PACKAGE II
FOSSILL RIDGE HS ADDITIONS AND RENOVATIONSPARK GLEN ES ADDITIONS AND RENOVATIONSLONE STAR ES ADDITIONS AND RENOVATIONSSHADY GROVE ES ADDITIONS AND RENOVATIONSKELLER HARVEL ES ADDITIONS AND RENOVATIONS
HIDDEN LAKES ES ADDITIONS AND RENOVATIONS
WILLS LANE ES ADDITIONS AND RENOVATIONS
DISTRICT-WIDE SAFETY AND SECURITY UPGRADES
FLORENCE ES REPLACEMENT
HERITAGE ES REPLACEMENT
KELLER MS ADDITIONS AND RENOVATIONS
DISTRICT-WIDE MEP AND LIFE SAFETY SYSTEM UPGRADES PACKAGE 1 - GROUP 1
FOSSILL HILL MS ADDITIONS AND RENOVATIONS
INDOOR EXTRA CURRICULAR PROGRAM FACILITIES AT HIGH SCHOOLS
NEW AGRICULTURE SCIENCE CENTER
NEW ADULT TRANSITION CENTER
BEAR CREEK INTERMEDIATE SCHOOL ACADEMIC RENOVATIONS
FREEDOM ES ADDITIONS AND RENOVATIONS COMPLETION AUGUST 2025
COMPLETION AUGUST 2025
COMPLETION AUGUST 2025
COMPLETION AUGUST 2025
SUMMER 2025
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
LRFP PROJECTSPROJECT SCOPE DESCRIPTIONSPROJECT SCOPE DESCRIPTIONS
• Table Discussions
• Q&A
• Main Take Away from Tables
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
CO-VOICEBOND PROPOSITION BUILDINGBOND PROPOSITION BUILDING
• Work in Tables
• Consensus Based Model
• Interactive, Live Voter Application
KELLER ISDCITIZENS’ BOND ADVISORY COMMITTEE
CO-VOICEBOND PROPOSITION BUILDINGBOND PROPOSITION BUILDING
• Alternatives if Absent:
July 16th, 6:00-8:00pm | Lone Star Rooms