KEG-BROCHURE-2020.pdf - Kuwaiti Engineering Group

135

Transcript of KEG-BROCHURE-2020.pdf - Kuwaiti Engineering Group

C O N S U L T A N T P R O F I L E & F I R M D A T A

Table of Contents

Consultant Profile & Firm Data Description of Firm

− Profile− Philosophy

Team − Keg Organization Chart− Principals− Planning & Architectural Design− Ecological and Environmental− Civil & Structural− Electrical & Low Voltage− Mechanical & Air-conditioning− Quantity Surveying & Tender Documents− C.M. & Site Supervision− Foremen & Inspectors− Draftsmen− Secretaries− Administration

Licenses & Qualification Certificates

Computer Facilities − Computer System− Software− Peripherals− Desktop video presentation system− Computer system for structural calculations− Computer system for system calculations− Office applications− Vehicles

KEG ORGANIZATION CHART

CONSTRUCTION DEPT.

QU. SUR.& SPECS. DEPT.

ELECTRICAL DEPT. MECHANICAL DEPT. STRUCTURAL DEPT. ARCHITECTURAL DEPT.

INTERIOR DESIGN DEPT.

LANDSCAPE DEPT.

Mahmoud El Sayed

CHAIRMAN

DEPUTY CHAIRWOMAN

EXECUTIVE MANAGER

Rafat Saleh Ellen Al Rashed

K. Palaniyandi

Ghassan Ghandour

M.Ali Jainulabdeen Isaac Fayek Mohammed Mustafa Mohamed Daaoush

TECHNICAL SUPPORT STAFF

COORDINATOR /LIASON

Graphic Designers / Junior Engineers / Surveyors / Desk Research / Analyst / Statistics / CAD Drafters / Others.

Abd ul Hameed Al Abhar

Othman Al Rashed

Hana Al Rashed

CON

TRO

L PAN

EL

General Manager

Ellen Al Rashed

C O N S U L T A N T P R O F I L E & F I R M D A T A

Firm Name KUWAITI ENGINEERING GROUP (KEG)

Office Address Main Office

Year Established

Type of Organization

Kuwaiti Engineering Company Hawally, Al Othman Str at 3rd Ring Road Burj Abdulla Al Othman (The Promenade) - 3rd Floor Office No. B P.O. Box 960, Safat 13010 Kuwait

Tel: (00965) 222789 06/07/08 Fax: 222789 09 E-mail: [email protected] Web Site: www.kegkuwait.com

1971

Kuwaiti Engineering Consulting Firm

Owned by Mr. Othman Saud Al-Rashed

Type of Service - Urban Planning- Architectural, Structural and Civil Engineering- Interior Design and Decoration- Electrical and Low Voltage Engineering- Mechanical Engineering (Air-conditioning, Plumbing,

Fire Fighting Infrastructure)- Construction Management, Construction Supervision- Ecological and Environmental

C O N S U L T A N T P R O F I L E & F I R M D A T A

Principal Members

1. OTHMAN AL-RASHED, B.S.C.E Civil 1967, M.S.C.E. Civil1970, Owner & Chairman

2. HANA AL-RASHED, Environmental Engineer, DeputyChairwoman

3. ABDUL HAMID M. ALABHAR, Architect, 1980 ExecutiveManager

4. ELLEN AL-RASHEDGeneral Manager, Head Interior Design

KEG Key Members

1. MOHAMMED JAINULABDEENElectro-Mechanical Chief Engineer

2. KUMARSAMY PALANIYANDIPrincipal Electrical Engineer

3. RAAFAT SALEHPrincipal Supervision Engineer

4. Mohammed MustafaPrincipal Landscape Engineer

5. GHASSAN GHANDOURCoordinator / Liaison

6. ISSAC FAYEKHOD- Structural

7. MOHAMMED DAAOUSHHOD- Architectural

C O N S U L T A N T P R O F I L E & F I R M D A T A

DESCRIPTION OF FIRM

Profile Kuwaiti Engineering Group (KEG) has been in continuous practice since its establishment in 1971. It is now a fully integrated Architectural and Engineering practice. The Firm’s portfolio includes over 150 major projects of various types. The estimated construction value of the completed projects exceeds $2 billion. The interests of the firm at the time of its institution were in Civil/Structural Engineering and Architectural services, but the scope of its activities has since widened considerably. The practice now includes all skills necessary for the complete engineering design of buildings including their interiors, project planning, building economics, traffic engineering and transportation, damage assessment, claims preparation and environmental impact assessment. These skills, in addition to others, enable K.E.G. to provide multi- disciplinary engineering services covering a broad spectrum. The firm’s interest in development expansion and the latest technologies in design strategies is a key role to its 5 decades of success.

KEG is up to date with all the demands of the engineering world. In this regard, The Firm has dedicated a small branch of its efforts towards the much-needed environmental service sector in order to support the growing environmental requirements related to pre/post development projects.

Philosophy Our philosophy has been and continues to be working with our clients to plan and design buildings that contribute value to the environment in general with emphasis on the concept of “quality of life”. The latter is aimed at providing users of the facility with the appropriate surrounding which will provide for high efficiency in performance and enhanced productivity. Each individual project provides solutions to the client’s demands and caters to the various key parameters; such as context, function and finance. The ingredients used to achieve our goals are commitment, accountability and team work.

Our approach is to identify the requirements and recognize professional expertise (whether in- house or other assistance) thus yielding services stemming from the cumulative management processes in decision-making and logical analysis leading to successful solutions. It is essentially a dynamic process of transforming concepts into reality with efficient buildings that are easy to operate and maintain.

Our facilities play a key role in the realization of our design concepts. The latest hardware and software aid in sustaining a balance between innovation and technology. They further enhance the integrated planning and design capabilities by permitting concept alternatives to be thoroughly explored.

Team Our team consists of Professionals- incorporating Planners, Architects, Interior Architects and Perspective Draftsmen, Civil/Structural/Electrical/Mechanical and Environmental Engineers & Quantity Surveyors among others, all of whom are qualified to offer a complete and personalized service to every client while keeping the cost of projected work under strict control, particularly in rehabilitation works, which normally are relatively more expensive.

��l �� vk � 2005/5 �) vfo�l OA 27 1�wt OA 7 ijull OA --4 �4 d� W �,

;.2007/6/25 �J� .(2007 I 15 / 954 / 4;,.;,. /� ;,.) �J ��l �l Jlfol �_,,

;,.2018/4/29 �J� .(2018/193) �J ��l ;.LL .».� �Jl�¥l Jl� �,

.�.a.a.II wl.J' tr i r)U 1 ! iJ�I �.a.a.II "-JA ?If / Jl� �l � �J�l Jl� � �� �

. ..:at,-11 .aja. �� / vi�l �W

.{d(:u wL-1.,.i) 11 aaii �� wL.t�- ��J ��� w�� -iJ.W �J wl.si-..!J �4-t /� ��l �l .il_,lyu

;,. 2022 I 4 I 28 � ;,. 2018 / 4 I 29, 06 lJ�l �l� &J't i� ..ill�-9

� 2018/5/6, JL��l �)� 9/_. • - 75/11/� •, �l �)

11 6 JAN 2020 Date: .................................................................. : �_;�I

.................................................................. : �1_,.J.I

Ref. . .............................. 1.7...0 .. t .............. : �_;�l

55/16/ I'

, .! ,ut �.;GJ Ministry of Finance

183172 :�I iJ.;

j ! oii J �.)Ui.o �i w� wl...o.:?:i ,,,4 �Lui�� LA ,L-...o_A.1 �.,_.w1 o\5' �

uyWJ ��I �Ylll 0-4 (37,16) �1_,_1.1 r�i Jlo.c.1--9�1 � � �..9,�.,_.w1

b.:b,;..tl\ J ��1 t, 1" :01 o)�l .)Lh>!J 1955 � 3 r�y-J.J J..La.1.1 2008 � 2

� � M-'-4 1.,-o ..Hi u-..o i.,,ll o�� �� JS' 0-4 ..9i ...L..LJI � 0-4 % 5 � � � J

.w>t4W ..9i w�WI ..9i

--9�1 � d.+,ll.b.o 4UI o)J_,J..9 .�"ii 0��1 �� "il wl.i..'?:i ,,.,4 �i __j�"i..9

.2008 � 2 uyWJ ��I �Ylll 0-4 ( 39) o�UI r�� li.s..9 .4 ;; ?: i 11,tl ���

.�..,...,;II o.o Slu.o..9 a.i�l ":-'>40 J,,> u.o �t.il oJ�I: �':)l..

�l..9 ��1 �I S..Jb!

anaham

nt•t•Yo: �ls - www.mof.gov.kw- u.JPI 13001 -(i>�t) �: '-!·� -u!)u,lt �

Ministries Complex - P.O.Box : 9 (Safat) - Postal Code 13001 Kuwait - www.mof.gov.kw • Fax : 22404025

C O N S U L T A N T P R O F I L E & F I R M D A T A

TECHNICAL STAFF

Planning & Architectural Design

1. Ghassan Ghandour

2. Rafat Hassan Saleh

3.

Senior Architect/Planner

Sr. Architect

Lebanese B.Sc. Arch. Lebanon 1980

Lebanese BSc. Arch. Yugoslavia 1993

Egyptian B.Sc. Civil Egypt 2016

Ecological & Environmental

Hana Al-Rashed Associate Consultant Kuwaiti M.Sc. (EcologicalEnvironmentalEngineer, andWater

AUB , Lebanon

1996

B.Sc. Bio Med. Boston Uni, Engineering USA

Civil & Structural

1. Mahmoud El Sayed

2. Obay El Sayed3. Oumany Mokhtar4. Mohammed Gharib

Civil Engineer

Civil EngineerCivil EngineerCivil Engineer

Egyptian

Egyptian Egyptian Egyptian

B.Sc. CivilB.Sc. CivilB.Sc. CivilB.Sc. Civil

EgyptianEgyptian

EgyptianEgyptian

2012

2012

20172013

Electrical & Low Voltage

1. Kumarasamy PalaniyandiSenior Electrical

Engineer

Mechanical

Indian B.Sc.

ElectricalIndia 1968

1. Mohamed Jainulabdeen Senior Mechanical Engineer

Indian B.Sc.

Mechanical

India 1978

Name Position Nationality Degree From Year

Amr Adel Elhamy Sr. Architect

1.

1992

C O N S U L T A N T P R O F I L E & F I R M D A T A

Quantity Surveying & Tender Documents

1. Mahmoud El Sayed Senior Quantity Surveyor B .Sc. Civil 2012

C.M. & Site Supervision

Egyptian B.Sc. Civil Egypt 19741. Fayek Isaac

2. Abdelmegid Hassan

Resident Engineer

Resident Engineer Egyptian B.Sc.Architect Egypt 1969

Foremen & Inspectors

Civil Inspector Egyptian Diploma Civil Engineering

Egypt 1965

Civil Inspector Egyptian Diploma Civil Egypt 1971 Engineering

1. Alaa Eldin Rachad Ali

2. Najib Abou Gendi

3. Hamdan Mahmoud Electrical Inspector Egyptian Diploma Egypt 1986 ElectricalEngineering

Mechanical Inspector Indian Diploma Mech. Engineering

India 19744. Kazi Khalil

5. Kamal Khamis Civil Inspector Egyptian Egypt 1970

Name Position Nationality Degree From Year

Egyptian Egypt

Diploma Civil Engineering

Mechanical_______________________________________________________________________________________________

1. Mohamed Jainulabdeen2. Roin Banerji

Senior Mechanical Eng.Senior Mechanical Eng.

IndianIndian

B.Sc. Mech.B.Sc. Mech.

IndiaIndia

19782011

Electrical & Low Voltage____________________________________________________________________________________

1. Kumarasamy Palaniyandi Senior Electrical Eng. Indian B.Sc. Electrical India 1968

C O N S U L T AN T P R O F I L E & F I R M D A T A

Draftsmen

Indian Diploma India 1974 Electrical

Indian

Egyptian

Engineering Drafting Diploma Drafting Diploma

India 1999

Egypt 1987

Secretaries

Secretary Secretary

Egyptian B.Sc. Egypt 2002

Administration

Egyptian Egyptian

Egypt

Egyptian

Sri Lankan

Labor Sri Lankan

Labor Egyptian

Name Position Nationality Degree From Year

Syrian DraftingDiploma

Syria 1994

1. K.V. Gangadharan

2. Praveen. K. J

3. Nasr El-Din

4. Asma Kheir El-Din

5. Soliman Ahmed Ali Egyptian Drafting Egypt 1980Diploma

6. Tarek Mahmoud Ablsamea

Electrical Draftsman

Mechanical Draftsman

Architectural Structural

Draftsman Electrical

Draftsman Structural

Draftsman Pakistani Drafting Pakistan 1974

Diploma Egypt 1980

H.S.C

H.S.C

Egypt

Egypt

1962

1. Tarek Abd El-Aziz Liaison

2. Mohamed Hamdy AdulHameed Liaison

Liaison

Driver

Driver

3. Mohammed Mustafa

4. Gamal Helmy

5. Mohath Adam Sahib

6. Ashraf Mohamed

7. Al Hayl Salah Fahmy

Osama Gaber Hussain Adelwahed Mohammed Ali Waleed Bahloul

3.4.

2.SecretarySecretary

EgyptianEgyptianEgyptian

B.Sc H.S.cB.Sc

EgyptEgyptEgypt

200019802012

C O N S U L T A N T P R O F I L E & F I R M D A T A LIST OF SCIENTIFIC & TECHNICAL APPARATUS, EQUIPMENT’S, WORKSHOPS AND

LABORATORIES.

Item Sl Name Type Manufacture Specification No. Unit Price

1.TECHNICAL EQUIPMENTS (Available at KEG offices) Computers 01 Network

ServerGIGABYTE China Intel Core I7 2.8 Ghz

Computer with 8 GB RAM, 2Nos.500 GB Hard disk, 21” LG LCD Color Monitor

2 800

02 Desktop Computer

China Intel Core I5 3.33 Ghz Computer with 6GB RAM, 2Nos.500 GB Hard disk, 21” LG LCD Color Monitor

9 400

03 Desktop Computer

China Intel Core I3 3.1 Ghz Computer with 6 GB RAM, 320 GB Hard disk, 17” SAMSUNG LCD Color Monitor

8 300

04 Desktop Computer

China Intel Core I3 3.06 Ghz Computer with 4 GB RAM, 260 GB Hard disk, 17” SAMSUNG LCD Color Monitor

8 250

05 Laptop Computer

China Intel Core I5 3.33 Ghz Computer with 6GB RAM, 2Nos.500 GB Hard disk.

3 350

Plotters and Printers

06 OCE-300 Black Plotter

OCE China Plotter and Scanner A0 to A4

2 6000

07 Plotter HP China HP 800 Design jet A-0 size Color Plotter

3 600

08 Printer HP China HP Desk Jet Color Printers

8 100

09 Printer Epson China Epson Printers (Stylus Photo)A3&A4

6 120

10 Printer HP, Canon China Various Laser Printers (HP, Canon).

4 200

11 Back-up driver

HP China CD ROM drives for access to large library of drawings, photos, documents and software applications

4 50

12 Back-up driver

HP China HP CD Writers(external) 6 20

Software 13 Drafting Software

USA Auto CAD 2016 for Design Drafting

14 Drafting Software

USA Revit Architecture 2016 Revit MEP2016

C O N S U L T A N T P R O F I L E & F I R M D A T A

LIST OF SCIENTIFIC & TECHNICAL APPARATUS, EQUIPMENT’S, WORKSHOPS AND LABORATORIES.

Item Sl Name Type Manufacture Specification No. Unit Price

Visual Software Programs

15 3D & Animation

USA 3D Studio Max and, Adobe Premiere for rendering and

4

16 3D & USA 4 Animation Adobe Photoshop CS

6, Corel DRAW GraphicSuite 14, Photo Paint/Illustrate, Adobe Acrobat 10.0Professional /imageprocessing and report printing, MicrosoftPower Point,Macromedia director for Client presentations

Structure 17 Structure, USA -Various software for 2 Software Drafting structural analysis and

and designs such as SAPCalculations 2000, STAAD PRO

-EtaBs

-SafeSecretary 18 Secretary USA Software for both Arabic 5 Software Programs and English using bi-

and lingual packages of Document Windows, Microsoft Control Office 2016.Primavera

and Microsoft Office project 2016

Accounting Software

19 Al-Shamel Pro. Kuwait

Administration Software

20 Al-Shamel Pro. M.S. OfficeAdobe Acrobatpro.

Kuwait USA USA

Anti-Virus Software

21 KasperSky Antivirus 2017

External Communication

22 Telephone Fax

Kuwait 3 2

Internal Communication

23 Extensions Lines

42

Internet 24 DSL and Rooter

2.Environmental Equipment- List of Scientific & Technical Apparatus, Equipment’s, Workshops and laboratories are available with theInternational Associate(RSK)

C O N S U L T A N T P R O F I L E & F I R M D A T A

LIST OF PROJECTS CATEGORIES

A. TOWN PLANNING & URBAN DEVELOPMENT

B. COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

C. HOTELS / RECREATIONS

D. HOSPITALS & CLINICS

E. MILITARY PROJECTS

F. INFRASTRUCTURE & LANDSCAPE

G. INDUSTRIAL PROJECTS

H. PUBLIC & SPORTS FACILITIES

I. ENGINEERING DESIGN

J. REHABILITATION PROJECTS

K. INTERIOR DESIGN

L. ENVIRONMENTAL ASSESSMENT

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR) TOTAL PROJECT

COST NAME(S) OF ASSOCIATED

FIRMS % OF TOTAL

WORK DONE BY YOUR FIRM FROM TO

TOWN PLANNING & URBAN DEVELOPMENT:

2015 Ongoing 2 Billion PMDC 25% Design and Construction Management Consultancy Services

Planning Consultancy 2012 Ongoing 0.513 Milllion 100%

Design and Supervision

Ministry of Public Work - Mega Projectors Section

Public Authority for Agriculture Affairs & Fish Resources

Ministry of Interior, Kuwait

2012 2015 60 Million AIS 70%

1. A/11/2013Professional Program, design, and Construction Management Consultancy Services (Mubarak Al Kabeer Port Project)

2. Study and Design Kuwait Agricultural Master Plan

3.

4.

Administration and Support Facility Buildings Al-Kazma Shooting RangeNational Bank of Kuwait Branches (14) in Kuwait

5. Seven Sub-Regional Physical Plan

6. Development and Revision of the Comprehensive Strategy for Industrial AreasSaudi Arabia

7. Khafji Development project

Design and Construction Supervision

Planning Studies

Planning Studies

Master Plan and detailed Architectural Concept

National Bank of Kuwait,

Kuwait

Kuwait Municipality

Kuwait Municipality

Al – Maousherji Catering, Kuwait

2005

2006

2006

2006

2009

2009

2009

2009

10 Million

40,000,000

100%

100%

100%

100%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR) TOTAL PROJECT COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

Comprehensive Kuwait Municipality

Government of Kazakhstan (Kuwait Fund Financed)

2003

2001

2006

2004

Colin Buchanan & Partners U. K

Dal Al-Handasah Shair & Partners, Beirut-U.K. and ORTA Kazakhstan

60%

30%

9. Review of Third Kuwait Master Plan. The Project is in three levels:- National level- Metropolitan areas Kuwait City

10. Feasibility Study of the Major Utilities at Left Bank of Isim River ofthe New Astana (Expansion Areas Transport Network Expansion Water Supply

11. Hydraulic Program for Village & Pastures –Republic of Senegal

Ministry of mines and energy of the Republic of Senegal / financed by Kuwait Fund for Arab Economic Devolvement Project

2001 2003 14,000

12. Public Shelter Master Plan 1996 1998 345,000 30%

13. Shuwaikh Industrial AreaRedevelopment II

study in 3 phases: 1 - Data collection. 2 - Planning studies. 3 - Plan preparation

Feasibility Study

Determination of the wells, construction & supervision

Study and preparation of recommendation report

Preplanning on short and long-term basis

Ministry of Public Works, Civil Defense, Ministry of Interior

Kuwait Municipality 1993 1994 14 Million

Senegal company SETICO ‟Sahel Etudes Ingineurs Conseils"

Dar Al-Handasah Shair & Partners, Beirut – Cairo- U.K.

Dar Al-Handasah Shair & Partners, Beirut – Cairo– U.K.

90%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

14. Fintas Major Center(4 Contracts)

Planning, Design and Tender Doc

Kuwait Municipality

1985 1987 40,000,000 Dar Al-Handasah Shair & Partners, Beirut – Cairo– U. K

80%

15. Shuwaikh Industrial AreaRe-development – I Re-planning on short

and long-term basis Ministry of Planning Kuwait

1982 1984 172 Million Dar Al-Handasah Shair & Partners, Beirut – Cairo– U.K.

55%

16. Subiya New Town,Kuwait Phase I

Physical/Architectural Planning Infrastructure

Ministry of Planning Kuwait

1982 1983 3.7 Billion Dar Al-Handasah Shair & Partners, Beirut – Cairo– U.K.

40%

17. Bubiyan Island, Kuwait Geotechnical Survey and Development Recommendations

Ministry of Planning Kuwait

1981 1982 1 Billion Dar Al-Handasah Shair & Partners, Beirut – Cairo– U.K.

40%

18. Local Plan Review,Transportation plan ofSalmiya, Kuwait

Study, Analysis and Design of New Center

Kuwait Municipality

1981 1983 20,000,000 D.C.I. Int. USA (Traffic) 90%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

19. Salmiya transportation

local plan view- plan design of the center

Planning studies, landscaping, design, transporting study, utilities studies, planning design, tender documents for Salmiya new center and feasibility studies.

Kuwait

Municipality 1981 1983 1,700,0000 Dar Al-Handasah ‟Shair &

Partners & D.C.I Int. USA (traffic)

100%

TOWN PLANNING & URBAN DEVELOPMENT

PROFESSIONAL PROGRAM, DESIGN AND CONSTRUCTION MANAGEMENT CONSULTANCY SERVICES MUBARAK AL KABEER PORT PROJECT

Client Ministry of Public Work - Mega Projects Section

Consultant Kuwaiti Engineering Group in associated with PMDC

Project The project is to provide program management, design and construction management services in respect to the Mubrak Al-Kabeer Seaport Development program

Services Design and Construction Management Consultancy Services

Total Cost KWD 2 Billion

Design Period - 2015

Completed -

TOWN PLANNING & URBAN DEVELOPMENT

STUDY, DESIGN AND THE DEMARCATION OF LAND AND ALLOCATED TO THE BODY, CLARIFIED AND SITE WITHIN

THE STRUCTURAL THIRD PLANNED FOR KUWAIT

Services Planning Studies Includes

- Specified Agriculture studies (plant,animal, fisheries beautificationresources)

- Demographic and social studies- Economic Studies- Urban Studies- Infrastructural Studies- Logistic Studies- Final Plan for Agriculture land use &

2040

Total Cost KWD 0.513 Million

Client Public Authority for Agriculture Affairs & Fish Resources

Consultant Kuwaiti Engineering Group

Project The project purpose is to prepare general future plans to develop PAAF's sites and projects for the geographical distribution within the framework of its territorial Kuwait, also to develop the economic sector, Agriculture, Animals, Fisheries, beautification and environmental protection of resources. Everything includes development of recent and future main infrastructure that could be sufficient to achieve the targeted purposes including requirements for urban development all supplied with necessary utilities and services to the targeted term 2040.

Design Period - 2012 Completed - Ongoing

TOWN PLANNING & URBAN DEVELOPMENT

TECHNICAL REQUIREMENT FOR THE SEVEN S UB REGIONAL PHYSICAL PLAN

Client Kuwait Municipality

Consultant Kuwaiti Engineering Group

Project The objectives of the project are:

- To achieve the vision that has been set outin the 3KMPR for each sub-regional area.

- To identify the development potential &constraints in each sub-region.

- To outline the technical requirements foreach sub• regional area.

Services

- Social & Economical Studies- Urban Planning- Town Planning- Housing- Commercial Floor Space- Industrial Lands- Environmental Studies- Traffic and Transportation- Services- Utilities (Power, Water, Drainage, Sewage, Irrigation, etc.

Study Period Completed - 2006

TOWN PLANNING & URBAN DEVELOPMENT

DEVELOPMENT AND REVISION OF THE COMPREHENSIVE STRATEGY FOR INDUSTRIAL AREAS

Client Kuwait Municipality

Consultant Kuwaiti Engineering Group

Project The Objectives & the Project are:

- To lay down Master Plan for industrial Area up toyear 2030

- To Identify Classification of different IndustrialActivities

- To Propose Development Control Tools- To Propose Detail Plans for three Industrial Areas

Services - Urban Planning- Social & Economical

Studies- Landscape Studies- Environmental Studies- Traffic and Transportation- Utilities Studies

Total Cost KWD 60 Million

Design Period - 2012

Completed - Ongoing

TOWN PLANNING & URBAN DEVELOPMENT

KHAFJI DEVELOPMENT PROJECT KINGDOM OF SAUDI ARABIA

Client KSA

Consultant Kuwaiti Engineering Group

Project The Objectives & the Project are:

- To Lay down Master Plan for industrial Area up toyear 2030

- To Identify Classification of different IndustrialActivities

- To Propose Development Control Tools- To Propose Detail Plans for three Industrial Areas

Services - Urban Planning- Social & Economical Studies- Landscape Studies- Environmental Studies

- Traffic and Transportation- Utilities Studies

Total Cost KWD 40 Million

Design Period - 2012

Completed - Ongoing

TOWN PLANNING & URBAN DEVELOPMENT

THIRD KUWAIT MASTER PLAN REVIEW (3KMPR)

Client Kuwait Municipality

Consultant Kuwaiti Engineering Group (KEG) in Association with Colin Buchanan & Partners (CBP)

Project Review and update of the previous Kuwait Master Plans (KMP2 1983 & KMP3 1997) and presenting recommendations, policies and strategies at three planning levels:

- National Physical Plan- Metropolitan Structure Plan- Kuwait City Structure Plan

Services - Social & Economical Studies- Urban Planning- Town Planning- Housing- Commercial Floor Space- Industrial Lands- Environmental Studies- Traffic and Transportation- Services- Utilities (Power, Water, Drainage, Sewage, Irrigation,etc.)

- Updating GIS Land useStudy and Design Period The study is in three stages (2003 - 2005)

- Stage one Data and Issues Analysis- Stage two Planning Studies- Stage three Plans Preparation

IRAO

= New Sea Port

TOWN PLANNING & URBAN DEVELOPMENT

ASTANA CITY INFRA STRUCTURE DEVELOPM ENT FEASIBILITY STUDY-REPUBLIC OF KAZAKHSTAN

Client The Government of Republic of Kazakhstan Represented by the municipality of Astana City

Consultant Dar Al Handasah (Share & Partners) in Association with Kuwaiti Engineering Group and Kazakhstan from ORTA

Project The project consists of a feasibility study of major perspective lines of infrastructure development on the left – river bank part of the city of Astana

Services Financial and Economic Section - Country Economic background- Project Justification- Financial Analysis- Economic AnalysisTechnical Section- Section Information- Project Information

Execution Period 2001 - 2004

TOWN PLANNING & URBAN DEVELOPMENT

PUBLIC SHELTER MASTER PLAN-KUWAIT

Services - Studies- Alternative Design- Shelter Master Plan for Civil Defense

- Organization and System

- Cost of Program

Client Ministry of interior, General Civil Defense Department

Consultant

Kuwaiti Engineering Group (KEG) in Association with Dar al Handasah. (Shair and Partners)

Project

Consists of Master Plan for the State of Kuwait

Completed: 1999

TOWN PLANNING & URBAN DEVELOPMENT

FINTAS CENTER-KUWAIT EASTERN BLOCK DEVELOPMENT

Client Municipality of Kuwait Ministry of Public Works

Consultant Kuwaiti Engineering Group in Association with Dar Al Handasah (Shair & Partners)

Project Town Planning for 280,000 sqm built up area, roads and bridges of 50,000 sqm area in Kuwait - Fintas (Eastern Block). The Project consists of a Bus Terminal, a Shopping Complex with Souk and Fresh Food Market, a Regional Mosque, Public Service buildings, Local Offices, Polyclinic, Post Office, Police Station and Car park for 1,800 cars.

Services Urban Planning

Landscaping Design

Roads/ Brides and Infrastructure Design

Transportation Study (Roads &Traffic)

Feasibility & Economical Study

Tender Documents

Total Cost US $ 40 million

Design Period 1985 - 1987

TOWN PLANNING & URBAN DEVELOPMENT

SUBIYA NEW TOWN PHASE I - KUWAIT

Client Municipality of Kuwait

Consultant Kuwaiti Engineering Group in Association with Dar Al Handasah (Shair & Partners)

Project Planning for a new town including urban development for Kuwait - Subiya near the Bubiyan Island. The project consists of a complete study of all activities, facilities and utilities.

Services

Feasibility Study Socio -Economical Studies Geotechnical Studies Urban Planning Traffic Planning Roads and Bridges Design Infrastructure Design (Power, Water, Drainage, Sewage, Irrigation etc.) Landscape design and Cost Estimation

Study and Design Period All Phases 1984-1990

TOWN PLANNING & URBAN DEVELOPMENT

HYDRAULIC PROGRAM CEAO FOR VILLAGES & PASTURES - REPUBLIC OF SENEGAL

Services • Determination of the Walls• Construction Supervision

Total Cost KD 14,000

Completed in 2003

Client Ministry of Mines and Energy of The Republic of Senegal

Financing Kuwait Fund for Arab Economic Development Project

Consultant Kuwaiti Engineering Group in Association with the Senegal Company SETICO (Sahel Etudes lngenieurs Conseils)

Project The water supply in the rural areas, in the Republic of Senegal is one of the major, problems. The ground water table is lowering every year. New deep Wells are needed. The Project consists of 168 deep wells and the Reforestation of the Wells in rural areas.

, I

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTIONOF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE

FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR) TOTAL

PROJECT COST (KD)

NAME(S) OF ASSOCIATED

FIRMS

% OF TOTAL WORK DONE

BY YOUR FIRM

FROM TO

B. COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES:

1.Steel Structure Works Review & Development for ShootingRange (100 m)

2.Design and Review for SteelStructure Works forAdministration Buildings -Kuwait University, Shaddadyah

3. Design of Car Park Storage

Design

Design

Design

Ministry of Defense

Khaled Ali Al-

Kharafi & Bros

Agility - Kuwait

2017

2017

2017

2017

2017

Ongoing 8,000,000

100%

100%

100%

4.Al Awadhy Villa at Salwa

5.VIP rest building-structuralstudies

6.Al-Rashed Complex, Fintas

7.Nine prestigious compoundvillas

8.Design of New Al TameerBuilding

9.Mcdonald Complex, Alrihab10. Consultancy agreement to

merge, re-sort, planning anddesign plots from 123 to 157 atAl Siddique area & south suraresidence area

Design

Design

Design and Supervision

Design

Complete design for Architectural Structural Mechanical & Electrical

Design and Supervision

Design and planning

Yousef Al Awadhy

ACICO CO.

Al-Rashed Group

Sherif Al Sabah

Kuwait Oil Company

ABC real estate

Sheikh Mubarak Al Jaber Al Ahmed Al Subah

2015

2015

2014

2012

2011

2010

2010

2016

2015

Design completed

2013

2015

2012

2011

4 Million

8,000,000

36 Million

500,000

100%

100%

100%

100%

100%

100%

100 %

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTIONOF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE

FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED

FIRMS

% OF TOTAL WORK DONE

BY YOUR FIRM

FROM TO

11.Mercedes Benz Service Center

12.Kuwait Ministry of Awqafand Islamic Affairs “TheRenovation of AwqafCommercial Complexes.” Kuwait

Design, Audio v. Syst., Security Syst Tender Documents and Supervision

Full Design and Supervision

Alkazemi Co

Kuwait Ministry of Awqaf and Islamic Affairs

2006

2006

2009

2008

2,500,000

3,700,000

100%

100%

Design and Construction Supervision

Full Design and Supervision

Design and Construction Supervision

Design and Construction Supervision

Design and Construction Supervision

Design and Supervision

Full Design and Supervision

National Bank of Kuwait, Kuwait

Al Babtain Family

Kuwait Flour Mills and Bakeries Co.

Kuwait Flour Mills and Bakeries Co.

Kuwait Flour Mills and Bakeries Co.

Khaled Al- Roubayan

PAAF

2005

2002

2010

3,700,000

100%

100%

2001

2005

1,800,000 100%

2000

2000

2004

2002

500,000

349,000

100%

100%

2000 2001 250,000 10 0%

13.National Bank of KuwaitBranches (14) in Kuwait

14.Al Babtain Library, Kuwait

15.Kuwait Flour Mills- Office andCar park

16.Food Product Stores

17.Security Offices, Mosque, Lab.,Electrical sub-station

18.Khaled Al-Roubayan Villa

19.Public Authority for AgricultureAffairs and Resources NewHeadquarters

1998 2005 8,000,000 100%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTIONOF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED

FIRMS

% OF TOTAL WORK DONE

BY YOUR FIRM

FROM TO

Full Design and Supervision

Design

Design

Study, Design and Supervision

Design and Construction Supervision

Design

Construction Supervision

Design

Design & Supervision

Design & Supervision

Design & Supervision

Site Supervision

1998

1998

1998

1997

2001

1999

1999

2001

1,200,000

1,000,000

300,000

3,400,000

100%

100% 100% 100%

1997 1998 450,000 100%

1996 1997 3,000,000 100%

1995 1997 1,000,000 100%

1995 1995 1,100,000 100%

1994 1995 2,000,000 100%

Kuwait Flour Mills and Bakeries Co.

Balasem Company

Balasem Company

H.S. Al-Homaizi Grandsons Real Est. Co

Salhiya Real Estate Co.

Salhiya Real Estate Co

United Realty Co.

United Realty Co.

Majed & Essam Nafisi

Balasem General Trading Company

1994 1995 750,000 100%

20.Kuwait Flour Mills and BakeriesNew Headquarters

21.Balasem Towers

22.Balasem Diwaniya

23.Hamad Al-Homaizi CommercialTower

24.Salhiya Police Station Building

25.Golden Towers

26.Oudha Al-Mohanna Comm.Complex, Hawally

27.Al-Sharq Showrooms

28.Nafisi Villas

29.Sheika Basma Sabah Al-SalemAl-Sabah Villa

30.Al-Rashed Villa, Adeliya

31.Villas for Hadiya Sultan at Surraand Yarmouk

Mohsin Al- Rashed

Hadiya Sultan

1992

1992

1993

1999

500,000

1,500,000

100%

100%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTIONOF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED

BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

32.KAC New HQ Building 45,000sqm office area for 1200

Architectural, Structural and Services design, Tender Documents and Specification

Design and Working Drawings

Design and Supervision

Design

Design

Planning, Design and construction supervision

Design & construction supervision

Design & construction supervision

Kuwait Airways Corporation

Marafi Contract. and Trading Co.

Kuwait Airways Corporation, Kuwait

Salhiya Real Estate Co.

Shaker Al- Othman

Ministry of Public Works

Kuwait

Municipality

Kuwait Airways Corporation, Kuwait

1991 1998 11,000,000 100%

Two underground tunnels. Carfor 1200 cars. Infrastructure for13000 sqm Roads, Sewage,Storm water

33.TV Station, Abdaly 1990 1991 3,000,000 100%

34.KAC Security Building atKuwait Airport

1988 1989 50,000 100%

35.Fintas Residential Complex1988 1990 3,000,000 100%

36.Private Villas 1987 1990 300,000 100%

37.Audit Bureau HeadquartersBuilding

1986 1996 8,000,000 80%

38.Arab Town 1986 1993 1,500,000

Dar Al-Handasah (Shair & Partners) Beirut – Cairo– U.K.

100% Organization Building, Kuwait.

39.KAC Computer Center,Kuwait1986 1987 1,500,000 100%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTIONOF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED

BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

40. Shuwaikh Marine Adm.Bldg Design 1986 1989 500,000 100%

41. Al-Othman Center, Residential/ Full Design and 1986 1995 10,000,000 100% CommercialProject, Kuwait construction

supervision

Design and Supervision

1985 1989 600,000 100%

Design and Supervision

1985 1986 400,000 100%

Design and 1985 Cancelled 1,000,000 100% Supervision

Design and Final Tender

1985 1987 3,980,000 100%

Design and Final Tender

1985 1987 1,900,000 100%

Design and Final Tender

1985 1987 1,600,000 100%

Design and Final Tender

1985 1987 1,850,000 100%

Design 1985 1987 8,200,000 100%

Design and 1984 1986 1,200,000 100%

41. Private Villa CompoundMessila, Kuwait

42. Hawally Building (2) (Res. & Commercial, Kuwait

43. Commercial & ResidentialBuildings, Kuwait

44. Two Office Buildings, FintasMajor Center

45. Police Compound Fintas MajorCenter

46. Post Office Building FintasMajor Center

47. Fresh Food Market Fintas MajorCenter

48. Souk Complex Fintas MajorCenter

49. Mahboula Complex Kuwait construction supervision

Ports Authority

Public Authority for Minors Affairs

Sheikh Salem Al- Sabah

Ministry of Justice, Kuwait

M. Al Dalati

Kuwait Municipality

Kuwait Municipality

Kuwait Municipality

Kuwait Municipality

Kuwait Municipality

Public Authority for Minors Affairs, Kuwait

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTIONOF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED

BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

Design and Supervision

Public Authority for Minors Affairs, Kuwait

1983 1985 7,000,000 100%

Supervision 1983 1984 4,000,000 30% Kuwait Airways Corporation, Kuwait

Design and Supervision 1982 1985 1,000,000 100% Kuwait Airways

Corporation, Kuwait

Design and Civil Aviation, 1982 1985 650,000 100%

Supervision Kuwait

Design and Supervision

Kuwait Airways Corporation, Kuwait

1982 1986 3,000,000 100%

Kuwait Airways Corporation, Kuwait

1982 1986 4,000,000 100%

K.R.E.I.C., 1982 1986 2,000,000 100% Kuwait

1981 1983 1,500,000 100% Kuwait Airways Corporation, Kuwait

1979 1983 1,200,000 100%

50. Al-Othman Center (3) Res.& Commercial, Kuwait

51. K.A.C. Jet Engine Test Cell,Kuwait Airport

52. K.A.C. Service Building,Kuwait

53. Radar Building, Kuwait

54. K.A.C. Technical StoresKuwait Airport

55. K.A.C. Maintenance, KuwaitAirport

56. Kuwait Embassy, Muscat

57. K.A.C. AdministrationBuilding, Kuwait

58. HawallyComplex-No.(1)(Res & Commercial) Kuwait

Design and Supervision

Design, Construction Management

Design and Supervision

Design and Supervision

Ministry of Justice, Kuwait

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTIONOF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED

BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

Design, tender doc. Feasibility studies, & Cons. supervision

Design and Supervision

Design and working drawing

Design, Const. Management and Supervision

Design and Supervision

Design and Supervision

1978 1981 2,600,000

Ove-Arup, U.K. (Structure only)

100%

1978 1980 3,000,000 100%

1977 1977 75,000 100%

1977 1980 11,000,000 80%

1976 1978 3,000,000 100%

59. Al Shawafat Office Building,Kuwait

60. Office Buildings, Kuwait

61. Civil Aviation Building,Sanaa, Yemen

62. Salhiya Commercial Complex,Kuwait

63. Teachers Residential Complex,Kuwait

64. Office for Kuwait Society forBlind

Kuwait Foreign Trade, contracting investments

K.F.T.C.I.C. Kuwait

Gen. Board for South and Arabian Gulf Salhiya Real Estate Co. Kuwait K.F.T.C.I.C., Kuwait

Kuwait Society for Blind 1974 1976 177,990 100%

COMMERCIAL, RESIDENTIAL AND COMMERCIAL OFFICES

AL RASHED COMPLEX - HEADQUARTERS KUWAIT

Client Al-Rashed Group (Kuwait)

Consultant Kuwaiti Engineering Group

Project The impressively grand residential building comprised of different levels of residential towers, two basement levels car park, external open parking, open large court yard, three internal swimming pools, etc.

Services Design and Detailed Working Drawing

Architectural Structural Interior Electro-Mechanical Roads Landscaping Tender

Documents Construction Supervision

Total Cost KWD 4 Million

Design Period - 2014

Completed

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

MULTI PURPOSE HALL - KUWAIT

Services Design and Detailed Working Drawing

Architectural Structural Electro-Mechanical Roads Landscape Audio Visual Systems Security System

Tender Documents Construction Supervision

Total Cost

Client Ministry of Defense Military Engineering Projects

Consultant Kuwaiti Engineering Group (KEG)

Project A new conference complex was built keeping in mind the richness of Kuwait. It is a symbol of new age in the nation's history. Each and every facility included is state of the art, fully monitored and built to the highest standards with cutting edge features in design and functionality. This major work reveals how this design reflects Kuwait's turbulent past as well as the hopes for the future. The building brings forward an opportunity to significantly change the state of Kuwait and possibly the region. Inspiration for this project was drawn from the Kuwaiti cultural phenomenon, the regional architectural heritage, and the site architecture and campus surrounding.

KWD 9.5 Million

Design Period: 2003-2008

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

CONSTRUCTION OF NEW AL-TAMEER BUILDING HEADQUARTERS - KUWAIT

Services Design and Detailed Working Drawing

Architectural Structural Interior Electro-Mechanical Roads Landscaping

Documents Construction Supervision

Client Kuwait Oil Company

Consultant Kuwaiti Engineering Group

Project The purpose of this project was to review and design detailed working drawings for the new Al-Tameer Building (KOC)

Total Cost KWD 36 Million

Design Period - 2011

Completed

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

NATIONAL BANK OF KUWAIT BRANCHES

Client National Bank of Kuwait

Consultant Kuwaiti Engineering Group

Project National Bank of Kuwait has New Branches at Several Locations (10) In Kuwait. Each Branch Consists of 3 Floors (Basement, and Mezzanine Floor) to accommodate the Office, Teller Area, Service Counter, ATM Outlets, Strong Room, Etc. The Building Consists of Aluminum Curtain Wall Facade and Luxurious Interior Finishes in Marble/Granite, Decorative False Ceiling, Etc. The Building is provided with Packaged DX Ac Units and has sophisticated Security and IT systems.

Services Design and Detailed Working Drawing

-ArchitecturalStructuralMechanicalElectrical

RoadsLandscapingTender DocumentsConstruction Supervision

Total Cost KD 10 million

Completed- 2007

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

KUWAIT FLOUR MILLS-OFFICE BUILDING & CAR PARK

A A A A D S F S D FDDF

Client Kuwait Flour Mills & Bakeries Company

Consultant Kuwaiti Engineering Group

Project The office buildings & car park have two floors (basement and ground floor for 150 cars). The mezzanine as office area. Each floor is 2,500 m2. The building has an architectural precast facade.

Services -Design and Detailed WorkingDrawing

-Architectural-Structural-Mechanical-Electrical-Roads-Landscaping

-Tender Documents-Construction Supervision

Total Cost KD 1,800,000

Completed 2005

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

COAST GUARD HEADQUARTERS & FACILITIES KUWAIT

Client Ministry of Public Works

Consultant Kuwaiti Engineering Group in Association with Dar Al Handasah (Shair & Partners)

Project The new Coastguard Headquarters and facilities of 72,500 sqm area is located In Kuwait - Fintas. The project consists of a deep-water port with helicopter landing pad. Office buildings, education facilities, canteen and kitchen facilities, physical training facilities, workshops, maintenance docks, Mosque and car park.

Services - Design and Detailed Working Drawing

- Architectural- Structural- Mechanical- Electrical- Infrastructure- Roads- Landscaping

- Tender documents

- Construction Supervision

Completed 2004

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

PUBLIC AUTHORITY FOR AGRICULTURE AFFAIRS & FISH RESOURCES HEADQUARTERS - KUWAIT

Client P.A.A.F.

Consultant Kuwaiti Engineering Group

Project New Headquarter Atrium Building of 30,000 sqm with 4 Floors Located at Fifth Ring Road• Ghazali Street in Kuwait - Rabih. The Project Consists of Office Space, an Exhibition Hall of 600 sqm, a Conference Hall for 200 Persons, Cafeteria, other services with surface parking.

Services

- Design and Detailed Working Drawing

ArchitecturalStructural Interior Electro-Mechanical Roads Landscaping Tender Documents Construction Supervision

Total CostKD 8,000,000

Design Period - 1998-2000

Completed 2 0 0 5

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

KUWAIT FLOUR MILLS HEAD Q U A R T E R S

Services Client Kuwait Flour Mills & Bakeries Company

Consultant Kuwaiti Engineering Group

Project New office building of 3700 sqm with a built-up area consisting of 10 floors. It is located at GamaI Abdul Nasser Street in Kuwait-Shuwaikh. The structure of the building is concrete. The facade to the street is constructed as a curtain wall and on the backside it has pre-fabricated concrete cladding. The top management floor is a masterpiece and was designed to the highest standard of technology.

- Design and Detailed Working Drawings- Architecture- Structural- Mechanical- Electrical- Roads- Landscaping

- Tender Documents- Construction Supervision

Total Cost KD 1,200,000

Completed: 2001

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

AL-HOMAIZI TOWER-KUWAIT

Client Abbrar Company for General and Contracting

Consultant Kuwaiti Engineering Group

Project New commercial building of 7,590 sqm area of 28 floors is located at Fahed Al Salem Street, near Sheraton Hotel at the center of Kuwait. The project consists of 4 floors shopping center and 25 floors of areas, services with panoramic elevators and all facilities.

Services

Design and Detailed Working Drawing

Architectural Structural Electro-Mechanical Interior Design

Total Cost KD 3,400,000

Design Period 1995-1998

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

KUWAIT AIRWAYS CORPORATION NEW HEADQUARTERS KUWAIT

Client K.A.C.

Consultant Kuwaiti Engineering Group

Project New Headquarters Building of 45,000 sqm area for 1200 Employees, which is located between the Sixth Ring Road and the Airport. The project Includes Two Underground Tunnels, A Car-Park for 1200 Cars and External Works for 13,000 sqm, Roads, Sewage, Storm Water, landscaping and irrigation.

Services Design and Detailed Working Drawing Architectural Structural Electro-Mechanical Services Roads Landscaping Tender Documents Feasibility and Economical Studies Construction Supervision

Total Cost KD 11,000,000

Project Completed 1998

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

AUDIT BUREAU HEADQUARTERS - KUWAIT

Client Ministry of Public Work s

Consultant Kuwaiti Engineering Group in Association with Dar Al Handasah (Shair & Partners)

Project Office building of 11,250 sqm area of 14 floors and one basement, which is located at Ahmad Al Jaber Street in the center of Kuwait. The project consists of office space, a conference hall for 200 persons, a library, a safety shelter for 500 persons and a car park for 650 cars of 27,250 sqm area.

Services Design and Detailed Working Drawing

Architectural Structural Electro-Mechanical

Tender Documents Feasibility and Economical Studies Construction Supervision

Total Cost KD 8,000,000

Completed: 1996

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

ARAB TOWN ORGANIZATION BUILDING - KUWAIT

Client Kuwait Municipality

Consultant Kuwaiti Engineering Group

Project Office building of 5,820 sqm area, which is located at the Airport Road in Kuwait - Shuwaikh. The project consists of a prestigious hall for 150 persons, several meeting rooms, office areas, services and a car park. The Interior and facades are designed in the spirit to express the Kuwait and Islamic heritage.

Services

Design and Detailed Working Drawing

Architectural Structural Electro-Mechanical Landscaping Design Interior Design and Loose FurnishingsTender Documents Construction Supervision

Total Cost KD 1,500,000

Completed 1993

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

AL OTHMAN CENTER - KUWAIT

Client Public Authority for Minors Affairs

Consultant Kuwaiti Engineering Group

Project Commercial and Residential Complex located at Al-Othman & lbn-Khaldoun streets intersection at Hawally. It consists of three floors shopping and office areas, ten floors residential twin towers and multi story car park for 350 cars.

Services Design and Detailed Working Drawing Architecture Structural Electro-Mechanical Interior Design Tender Documents Feasibility and Economical Studies Construction Supervision

Total Cost KD 10,000,000

Completed 1995

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

K.A.C SERVICE BUILDING - KUWAIT

Client Kuwait Airways Corporation

Consultant Kuwait Engineering Group

Project (Total Built-up Area 4400m2)

Stores Clinic Bank Post Office Stewards

Ticketing

Services Design and Detailed Working Drawing Architectural Structural Mechanical (NC, Water Supply, Drainage, Fire Fighting, Etc.) Electrical (Power Supply, Fire Alarm, Lighting, Security System) Tender Documents Feasibility and Economical Studies Construction Supervision

Total Cost KD 1,000,000 Completed 1985

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

KUWAIT AIRWAYS TECHNICAL STORE

Design and Construction:

Completed 1991-1992

Total Cost: KD 3,000,000

Client Kuwait Airways Corporation

Consultant Kuwait Engineering Group

Project - Damage Assessment and Report- Restore all the building including Architectural,

Structural and Services

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

KUWAIT EMBASSY COMPLEX MUSCAT - OMAN

Client Kuwait Real East Consortium

Consultant Kuwaiti Engineering Group

Project The Kuwait Embassy Complex in Muscat of 5,400 sqm built up area consists of three buildings, the Embassy, the Ambassador’s and Employee's Residences. The two storey complex was designed in the spirit to express Kuwait and especially the Islamic heritage and to suit the architectural environment of Oman. It contains state of art technology while keeping ample reserves for future expansion.

Services Design and Detailed Working Drawing Architectural Interior Design Structural Mechanical (NC, Water Supply Drainage, Fire Fighter, Etc.) Electrical (Power Supply, Fire Alarm, Lighting, Security System) Landscape Design Tender Documents Feasibility and Economical Studies Construction Supervision

Total Cost KD 2,000,000 Completed 1986

· ·

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

SALHIYA COMMERCIAL COMPLEX - KUWAIT

Client Salhiya Real Estate Company

Consultant Kuwaiti Engineering Group in Association with ove-Arup U.K (Structure Only)

Project The Salhiya Commercial Complex of 61,000 sqm built-up area adjacent to the Meridian Hotel Complex in Kuwait City. It consists of 8 floors above ground level and 3 basements with a car park for 400 cars. Three floors are reserved for the prestigious shopping center and the other floors are luxury office space.

Services Design and Detailed Working Drawing

Architectural Structural Electro-Mechanical Interior Design Tender Documents Feasibility and Economical Studies Construction Supervision

Total Cost KD 11,000,000 Completed 1980

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

KUWAIT AWQAF PUBLIC FOUNDATION THE RENOVATION OF AWQAF COMMERCIAL COMPLEXES

KUWAIT

Services Full Design and Supervision

Total Cost KD 3,700,000

Client Kuwait Awqaf Public Foundation

Consultant Kuwaiti Engineering Group Office of Consultation and Career development College of Engineering Kuwait University

Project The projects identity is a new vision which upgrades the image of The Awqaf Commercial Complex to be able to compete with the current new commercial malls in Kuwait.

Design Completed: 2007

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

MERCEDES BENZ SERVICE CENTER

Client Abdul Rahman AJ Bisher & Laid AJ Kazemi Co.

Consultant Kuwaiti Engineering Group (KEG)

Project The new Service center was built keeping in mind the convenience and comfort for Mercedes Benz Customers. It is a state of the art facility with cutting edge features in design and functionality derived from the core values of the Mercedes Benz brand. The building incorporates the main Service Reception & Customer Contact Area, an Express Service area housing with 6 Work Bays enclosed in glass, 4 Dialogue Reception Bays and the Customer Vehicle Delivery area on the ground floor. The Mercedes Benz Boutique, Accessories area and Cafeteria are located on the ground floor. On the first floor is offices, training facilities and administration.

Services Design and Detailed Working Drawing

Architectural Structural Electro-Mechanical Landscaping Design Roads Security system Interior Design and Loose Furniture Tender Documents Construction Supervision

Total Cost: KD 2.5 million

Design Period: Completed: 2009

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

AL SHAWAFAT OFFICE BUILDING - KUWAIT

Client Kuwait Foreign Trading, Contracting & Investment Co.

Consultant Kuwaiti Engineering Group

Project Total Built-up Area: 19000 m2 Office Building Consists of:

- Office Space- Shops- Stores

Services - Architectural

- Structural

- Mechanical (A/C, Water Supply)- Drainage, Firefighting, etc.

- Electrical (Power Supply, Fire Alarm,Lighting, Security System

- Tender Documents

- Feasibility and Economical Studies

- Construction Supervision

Total Cost KD 2,600,000

Completed 1981

COMMERCIAL, RESIDENTIAL AND OFFICE COMPLEXES

AL BABTAIN LIBRARY- KUWAIT

Client AL BABTAIN FAMILY

Consultant Kuwaiti Engineering Group

Project The Building Consists of 3 Floors including a Basement Car Park and a Modern Multipurpose Hall to Accommodate 500 Persons in addition to a Separate

Administration Building. The Facade has

an aluminum curtain wall and natural marble stone cladding covering in harmony with the surrounding environment. The external landscape is vast and inviting with a necessary Irrigation System.

Services:

Construction Supervision

Total Cost:

KD 3.7 million

Completed: 2005

, I

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

C. HOTELS / RECREATIONS:

Design and Moh.Saud Al Homizi recreation & touristic Co.

A B C Real State Company

2009

2008

2011

2011

12,000,00

14,000,000

Ove Arup, U.K. (Struc. only)

100%

100%

K.F.T.C.I.C. 1982 1986 3,000,000 100%

K.N.P.C. Kuwait. 1979 1981 1,750,000 100%

1.Saud Al Homizi Recreation &Touristic complex

2.Entertainment Complex‟ARABELLA"

3.Airport Transit Hotel(200-Rooms), Kuwait

4.K.N.P.C. Sea Club, Kuwait

5.Meridian (400-Room) Hotel

construction supervision

Design, detailed working drawings, const. supervision Design and construction supervision Design and Supervision

Design, Const. Management and Supervision

Salhia Real Estate Co.

1978 1981 11,000,000 90%

HOTELS / RECREATIONS

HOTEL MERIDIEN - KUWAIT

Client Salhiya Real Estate Company, Kuwait

Consultant Kuwaiti Engineering Group in Association with ove-Arup, U.K. (Structure Only)

Project A Five Stars Hotel building of 32,800 sqm area with 18 floors, located at Shuhada Street in the center of Kuwait City. The project consists of 366 bedrooms, 29 Suites, Prestigious Restaurants, Swimming Pool on top floor, Health club, Conference room and Large Ballroom (with press facilities).

Services

Design and Detailed Working Drawing

Architectural Electro-Mechanical Interior Design

Tender Documents Feasibility and Economical Study Construction Supervision

Total Cost KD 110 million

Project Completed: 1981

HOTELS & RECREATIONS

ENTERTAINMENT COMPLEX ARABELLA

Client ABC Real Estate Company

Consultant Kuwaiti Engineering Group

Project An Entertainment facility built with a site area of 13,075 m2 with a total built-up area of about 27,650 m2.The site is located in Al-Bida area directly on the seaside. The first floor, ground floor and half of the 1st basement contains Restaurants, Cafes, Boutique dining, Beach area, and all services and facilities serving this complex.

Services Design and detailed working drawings Architectural

Structural Mechanical Electrical Traffic Study Landscape Audio Visual Systems Security System Tender Documents Construction Supervision

Design Completed: 2009 Construction completed: 2014

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

D. HOSPITALS & CLINICS:

Design and Supervision

Design and Supervision

2013

2003

2015

2007

2,500,000

2,000,000

Norman + Dawbarn Ltd., UK

100%

100%

Design and Supervision

2001 2004 250,000 100%

Study, Design and construction supervision

1994 2004 12,000,000 70%

Design and Final Tender Documents

1985 1987 1,900,000 100%

Design and Supervision

1979 1982 800,000 100%

Design, Tender Documents and Construction Supervision

1979 1981 16,000,000 30 %

1. Construction & supervision of group health at Jahra

2. Kuwait Autism Center

3. Clinic and Laboratory

4. Care Center for the Mentallychallenged

5. PolyclinicFintas Major Center

6. Allergy Research Centre

7. Military Hospital

8. Administration, Pollutionscontrol Medical Center &Mosque

Design, Tender Documents and Construction Supervision

Ministry of Public works

Ministry of Awqaf

Kuwait Flour Mills and Bakeries. Co.

Ministry of Social Affairs and Labour

Kuwait Municipality

Abdul Mohsin Al- Rashed

Wista Area, Kuwait

Shuaibah Industrial Area, Kuwait

1978 1980 1,750,000 30 %

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

9. Pollution Control MedicalCentre in Industrial Area,Shuaiba

10. Al-Farwaniya GeneralHospital

Shuaiba Area Authority, Kuwait

Al-Farwaniya,

Kuwait

1977

1975

1980

1977

2,000,000

10,000,000

100%

30 %

11. Al-Jahra GeneralHospital

Design and Supervision

Design, Tender Documents and Construction Supervision Design, Tender Documents and Construction Supervision

Al-Farwaniya, Kuwait

1975 1977 10,000,000 30 %

HOSPITALS & CLINIC

KUWAIT CENTER FOR AUTISM MISHREF - KUWAIT

Client Kuwait Awqaf Public Foundation Tel: 25375018-17 Fax: 25375108

Consultant Kuwaiti Engineering Group Office of Consultation and Career Development- College of Engineering Kuwait University

Project Care Center Autism

Services Full Design and Supervision

Total Cost: KD 2.0 million

Period:

Design : 2003-2004

Construction Completed: 2008

HOSPITALS & CLINIC

CARE CENTER FOR MENTALLY RETARDED SOUTH SABAHIYA - KUWAIT

Client Ministry of Public Works

Consultant Kuwaiti Engineering Group in Association with Norman + Dawbarn Ltd.,U.K.

Project The center is built on an area of 55,000 sqm with 25 clusters and a central building for clinical, daycare services with swimming pool, rooms for administration, dining hall, kitchen and laundry services. Each cluster should accommodate a minimum of 20 patients. The project will house 180 men and 320 women and children. All clusters are linked with an air-conditioned corridor to the central building.

Services Design and Detailed Working Drawing

Architectural Structural MechanicalElectrical Roads Landscaping Design

Tender Documents Construction Supervision

Total Cost KD 12 million

Design Period: 1994-2000

Completed 2004

HOSPITALS & CLINIC

HOSPITALS & CLINIC

HOSPITALS & CLINIC

MILITARY HOSPITAL - KUWAIT

HOSPITALS & CLINIC

HOSPITALS & CLINIC

ALFARWANIYA GENERAL HOSPITAL - KUWAIT

HOSPITALS & CLINIC

AL JAHRA GENERAL HOSPITAL - KUWAIT

I

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

E. MILITARY PROJECTS:

Design and construction supervision

Design and Supervision

National Guard General Headquarter

National Guard

National Guard

2016

2015

2011

Ongoing

Ongoing

2011

9.5 million

15 Million

9,000,000

Dar Al-Handasah Shair & Partners, Beirut – Cairo– U.K.

NBBJ, USA

100%

100%

100%

Ministry of Interior

National Guard

1994

2009

2015

2010

67 million

14,000,000

30%

100%

Design review & value engineering

Design and construction supervision

Design and Supervision

Design and construction

supervision Ministry of Interior 2006 2013 70,000,000 40%

1. Samoud Camp

2. Spare Parts and AdministrativeBuilding for Simulation building

3. Review of design,specification,documents and valve engineeringwork for Samoud CampCompound Project

4. Special Forces Facilities

5. Construction of (4) mechanicshangers at National Guard camp

6. Criminal Evidence Headquarters

7. Multipurpose Hall at Mubarakiya Design and construction supervision

Ministry of Defense, Kuwait

2005 Ongoing 9 million 100%

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

100%

100%

100%

8. Helicopter Hangar andAdministration Building

9. Coastguard Headquarters andFacilities

10. 15th Brigade Camp ProjectKuwait

Design and construction supervision

Design and construction supervision

Supervision and Coordination

Ministry of Interior

Ministry of Interior

Ministry of Defense, Kuwait

2001

1993

1978

2002

2004

1985

800,000

30,000,000

33,000,000

MILITARY PROJECTS

ADMINISTRATIVE AND SUPPORT FACILITY BUILDINGS AL-KAZMA SHOOTING RANGE HEAD QUARTERS

KUWAIT

Client Ministry of Interior, Kuwait

Consultant Kuwaiti Engineering Group

Project The project consists of various buildings such as Observation and Control Tower, Lecture Building, Multipurpose Hall, Mosque, Central kitchen, Male Dormitory, Female Dormitory, Dormitory for Engineering Staff and Laborer’s, Play fields, Workshops, Armaments Main Store, etc. totaling 12,535 M2 built up area in the southwest part of the Shooting Range.

Services Design and Detailed Working Drawing

Architectural Structural Interior Electro-Mechanical Roads Landscaping Tender DocumentsConstruction Supervision

Total Cost KWD 60 Million Design

Period - 2012 - ongoing

MILITARY PROJECTS

GENERAL DEPARTMENT OF CRIMINAL EVIDENCE HEADQUATERS - KUWAIT

Client Ministry of Public Works

End user Ministry of Interior- General Department of Criminal Evidence

Consultant Kuwaiti Engineering Group(KEG) in Association with NBBJ and Crime Lab design (CLD).

Project A new Kuwait Criminal Evidence Headquarter is being built with a site area of 24,750 m2 and total built-up area of about 86000 m2. The building is 5 floors heights and 2 basements located at the six ring roads. It consists of two separate building and a sophisticated meaning; it is an iconic presence in its surroundings, physically and spiritually. The architecture of the building is looking for both the regional heritage as well as global prospects for inspiration and connection.

Services Design and Detailed Working Drawing

Programming Architectural Structural Electro-Mechanical Traffic Study Landscape Audio Visual Systems Security System Lab Design Tender Documents Construction Supervision

Total Cost

KD 70 Million

Design completed: 2009

Under Tender Stage

MILITARY PROJECTS

SPARE PARTS AND ADMINISTRATIVE BUILDING FOR SIMULATION BUILDING - KUWAIT

Administration Building

Spare parts store

Client National Guard

Consultant Kuwaiti Engineering Group

Project The project lies in Kazma area (Kazma Camp) and consists of two buildings, the administrative building and for simulation building Ground floor area- 1372.794 m2, first floor area- 1372.792, second floor area-1372.794 m2 & roof-99.46 m2,,substation area-113.92 m2.total area -4331.662 m2. The other building for spare parts store is de s ig ned in ground (1786.75 m2), mezzanine floors (288.58 m2) & Roof (79.09 m2) having total area of 3941.17m2

Services Design and Detailed Working Drawing Architectural External works, connect with existing services, roads and shades Structural Electro-Mechanical Tender Documents Construction Supervision

Total Cost KWD 15 Million

Design Period - 2015 - 2016

MILITARY PROJECTS

SPECIAL FORCES FACILITY SULAIBIYA KUWAIT

Client Ministry of Public Works

Consultant Kuwaiti Engineering Group in Association with Dar Al Handasah (Shair & Partners)

New Special Forces Facility of 630,000 sqm site area located in Kuwait Sulaibya. The project consists of several buildings and facilities such as Multipurpose Hall, Office Building, Educational Buildings, Sport Center, Restaurants, Workshops Outdoors physical activity area, Indoor / Outdoor Shooting Ranges and other Facilities.

Services • Design and Detailed Working Drawing

Mechanical / Plumbing / Fire Fighting

Electrical / Low CurrentInfrastructure, Irrigation andlandscaping

• Tender Documents

• Construction Supervision

Project:

Total Cost KD 465 million

Design Complete: 1994-2015

., I

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY

THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL

WORK DONE BY

YOUR FIRM FROM TO

F. INFRASTRUCTURE & LANDSCAPE

Full Design

Full Design and Supervision

2016

2006

Ongoing

2014

4,500,000

3,000,000

Dar Al- Handasa Shair And Partners

100%

100%

1. Design of Pedestrain Bridges indifferent locations in Kuwait

2. Public Authority forAgriculture Affairs and FishResources -New design forInfrastructure

3. Study, Design and Supervisionof Construction of Um Al-Hyman Treatment PlantExtension and Related works(State of Kuwait)

Design, Detailed working Drawings & supervision of construction for stage1 * Part I – of new um al- hyman treatment plant andrelated works.(wastewater treatment &TSE network for flows=400000m3/d* Part II – for the plantextension and relatedworks, (Wastewatertreatment & TSE networkfor flows= 250000m3/d.*Emergency TSE line

* preparation of tenderdocuments for stage 1 andother works

Khaled Ali Al-Kharafi & Bros.

Public Authority for Agriculture Affairs and Fish Resources, Kuwait

Ministry of Public Works - Kuwait

2009 2011 465,000000 20%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

3. Construction of Zigar-Khostav-

Shkev road in Tajikistan

4. Supervision, Study, Design andpreparing Documents ofPlanting. Maintenance andoperation of Kuwait EffluentUtilization Project, ForestryIrrigation Areas. Phase II.(State of Kuwait).

Design, detailed working drawings, tender doc., feasibility &economic studies, and cons. supervision.

Supervision

Ministry of transport and management of the republic of Tajikistan (Financed of Kuwait Fund)

Public Authority of Agriculture Affairs and Fish resources -Kuwait

2006

2004

2008

2006

6,900,000

3,500,000

15%

100%

5. Construction of Zigar - Khostav-Shkev Road in Tajikistan

Detailed Design of 36 km road in difficult terrain, Tender and Site supervision

Republic of Tajikistan, Ministry of Transport

2001 2004 8,000,000 15%

6. Feasibility study for

Construction of Zigar- Khostav-Shkev Road in Tajikistan(Concept Design of road aligned to the Pyani River Valley, Traffic Study etc.

Feasibility Study Republic of Tajikistan, Ministry of Transport

1999 2001 8,000,000

Dar Al-Handasah (Shair & Partners), and Tajikistan Company Tajgjigiprotransstory. Dar Al-Handasah Shair & Partners, Beirut – Cairo– U.K. Tajigiprotransstroy, Dushanbe

Dar Al-Handasah Shair & Partners, Beirut – Cairo– U.K. Tajigiprotransstroy, Dushanbe 15%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

7. Study, Design and Preparation of Documents;

Documents of Planting. Maintenance and operation of Kuwait Effluent Utilization Project, Forestry Irrigation Areas. Phase II.(State of Kuwait)

Public Authority of Agriculture Affairs and Fish Resources -Kuwait

1998 2001 570,000 Mott Mac Donald‟s Ltd. U. K 80%

Ministry of Public Works, Kuwait

1979 1982 5,500,000 Polytechnic, Czechoslovakia 50%

Ministry of Public Works, Kuwait

1979 1982 11,000,000 Ove Arup, U.K. 50%

8. Roads & Storm waterDrainage for Low IncomeHousing Areas of Jahra &Mina Abdullah, Kuwait

9. Mina Abdullah-N'wayseebRoad Project, Kuwait

10. Extension to KuwaitMain Sewage Scheme,Kuwait

Design, detailed working drawings & supervision of construction. -Full automatic irrigation system Linear parks (53 hectare) eastern side of king Fahad motorway and Forestry plantations (151) hectare western side of king Fahad motorway

Design and Supervision

Design and Supervision

Design and Supervision

Ministry of Public Works,

Kuwait

1973 1976 20,000,000 Typsa, SPAIN 35%

INFRASTRUCTURE AND LANDSCAPE

PUBLIC AUTHORITY FOR AGRICULTURE AFFAIRS & FISH RESOURCES INFRASTRUCTURE AND LANDSCAPING - KUWAIT

Client Public Authority for Agriculture Affairs & Fish Resources

Consultant Kuwaiti Engineering Group

Project The project consists of three floors for different complexes and offices and reviewer’s halls. Infrastructure works (Roads, assemblage and drainage of storm/sewage water, electrical, telephone and information systems). External boundary walls and main gates constructions.

Services

Design and Detailed Working Drawing Architectural Structural Interior Electro-Mechanical Roads Landscaping Tender Documents

Construction Supervision

Total Cost

Design Period - 2012

Completed 2014

KWD 3 Million

INFRASTRUCTURE & LANDSCAPE

CONSTRUCTION OF UM AL- HYMAN TREATMENT PLANT EXTENSION AND RELATED WORKS - KUWAIT

Client Ministry of Public Works – Kuwait

Project

.

INFRASTRUCTURE & LANDSCAPE

KHOSTAV-CONSTRUCTION OF ZIGAR- SHKEV ROAD REPUBLIC OF TAJIKISTAN

Services Design and Detailed Working Drawings

Client Ministry of Transport and Management of the Republic of Tajikistan

Financing Kuwait Fund for Arab Economic Development Project

Consultant Dar Al Handasah (Shair & Partners) in Association with Kuwait Engineering Group and Tajikistan Company Tagjigiprotransstroy

Project The actual road track between Zigar and Shkev is impassable during wintertime. Therefore 36 km of new road planned in difficult terrain with Galleries and Bridges. This road, aligned to the Pyani River, border to Afghanistan, allows for the transport of essential food during the whole year from Dushanbe to East Tajikistan. The deviation over high mountains is no longer needed.

Road Design Structural Design Drainage Design Economic Analysis

Tender documents

Feasibility and Economic Studies

Construction Supervision

Total Cost KD 80 million

Completed in: 2008

INFRASTRUCTURE & LANDSCAPE

MINA ABDULLA - NUWASEEB ROAD - KUWAIT

Client

Ministry of Public Works

Consultant

Kuwaiti Engineering Group

Project

- 58 km - 2 x 11 m Dual Carriage Way- Mina Saud SPUR- 10 km- 2 x 8 Dual Carriage W ay

Services

Design and Detailed Working Drawing

Architectural Structural Mechanical Electrical Landscape Design

Tender Documents Feasibility and Economic Studies Construction Supervision Planning Infrastructure design

Total Cost KD 110 million

Completed in 1980

INFRASTRUCTURE & LANDSCAPE

KUWAIT EFFLUENT UTILIZATION PROJECT FORESTRY IRRIGATION AREAS PHASE II

Client Public Authority for Agriculture Affairs and Resources

Consultant Kuwaiti Engineering Group in Association with Mott Mac Donald ltd. U.K.

Project The project was commissioned to increase the productivity of agriculture resources of Kuwait by utilizing the treated sewage effluent (TSE) for irrigation purposes. It consists of 53 ha of linear park area located east of King Fahed Motorway. 151 ha of forestry area located west of King Fahad Motorway near the Kuwait Sabah Al- Salem area have further facilities tor physical activities such as walking, jogging, football, volleyball and other activities.

Services

Design and Detailed Working Drawing

Architectural Structural Mechanical,Electrical, Roads, Landscaping Design

Tender Documents Construction Supervision

Total Cost

KD 5.7 million

Design Period: 1998-2001

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED

BY THE FIRM CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

NAME(S) OF ASSOCIATED

% OF TOTAL

FROM TO G. INDUSTRIAL PROJECTS:

1.Manufacturer of oil drillingequipment

2.Cold storage

3.Main Stores (13,14,15)

4.Carton Factory

5.Kuwait Flour Mills CarMaintenance Work shop andlabour residence- jleeb AlShuyoukh

6.Site survey for plot boundary andcomplete design package

7.Vegetable wholesale market

8.

9.

10.

Boundary wall for Vegetablewholesale marketBoundary wall for Shuwaikh Port LandConstruction of New workshop for well surveillance Group in South & East Kuwait Area

Design and Construction Supervision

Design and Construction Supervision

Design and Construction Supervision

Design and Construction Supervision

Design and Construction

Supervision

Design

Design

Design

Design

Design and Construction

Al Rashed Holding Company, Shwaiba industrial area - Kuwait

Kuwait Flour Mill Co

Kuwait Flour Mill Co

Ceasors General trading contracting co. -Anghara

Kuwait Flour Mill Co

Al Rashed Holding Company,

Kuwait Flour Mill Co

Kuwait Flour Mill Co

Kuwait Flour Mill Co

Turki Al Dabbous and Sons Trading and Contracting Company

2016

2016

2016

2011

2016

2015

2015

2015

2015

2015

2018

2018 2018

Ongoing

2019

2015

2015

2016

2016

Ongoing

4 Million

500,000

1,900,000

5 Million

3 Million

1.5 Million

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

NAME(S) OF ASSOCIATED

% OF TOTAL

FROM TO

11.Cleaning Detergent factory

12.Kuwait Flour Mills Warehouses,Kuwait

13.Fahd Al-Ahmed Bakery

14.Construction of cold storage andLaboratory # Al-Ahmadi

15.Cleaning Equipment Factory

16.New access control building

17.Construction of New building forwell surveillance Group in South& East Kuwait Area

18.Kuwait Flour Mills Workshopcomplex at Shewaikh

19.Kuwait Flour Mills New Stores,Shuwaikh

20.Kuwait Flour MillsSilo – 2001

Design and Construction Supervision

Planning, design, tender documents, const. supervision.

Design and Supervision

Design & Supervision

Design & Supervision

Design & Supervision

Design and Construction

Design & Supervision

Design & Supervision

Licenses & Construction Supervision

Seven Seas Navigation Company

Kuwait Supply Co. S.A.K.

Kuwait Flour Mill Co.

KOC

Abdulaziz Abdul Mohsin Al Rahed sons co.wll

KNPC

Turki Al Dabbous and Sons Trading and Contracting Company

Kuwait Flour Mills and Bakeries Company

Kuwait Flour Mills and Bakeries Company

Kuwait Flour Mills and Bakeries Company

2014

Phase I 2005 Phase II 2007 Phase III2016

2014

2012

2012

2012

2012

2005

2002

2001

2016

2007 2009 2018

Ongoing

2014

2014

2015

2013

2008

2011

2005

1.5 Million

3 Million 3 Million 2 Million

4.5 Million

1,000,000

300,000

7,000,000

4,000,000

2,500,000

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

BRIEF DESCRIPTIONOF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED

BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

21. New Catalyst WarehouseExtension

22. Helamin Factory and Office Building

23. Carton Factory

24. Petroleum HydrotreatingCatalyst Plant and Office

25. Central Warehouse

26. Central Laundry

27. Al-Magwa TV Station

28. KABD Broadcasting Station

29. Control Building GC-IIKuwait Airport

Design and construction supervision

Design and construction supervision

Design and construction supervision

Design and construction supervision

Full Design

Full Design

Structural Design

Full Design

Architectural, Structural and Services Design

Kuwait Catalyst Company

Kuwait Catalyst Company

Ceasars General Trading. & Contracting Co

Kuwait Catalyst Company

Azzad Catering and Services Company Azzad Catering and Services Company

Ministry of Information

Ministry of Planning

Bechtel/ Arab Contractors

2001

2001

2001

1998

1997

1997

1996

1994

1991

2001

2004

2003

2001

1998

1998

1997

1997

1991

2000,000

200,000

1,000,000

14,000,000

5,000,000

2,500,000

3,000,000

5,000,000

500,000

Kraemer & Partners, Engineers, Switzerland

S.H. Behbehani

Electrowatt Eng. Services, Switzerland

40%

100%

100%

100%

100%

30%

80%

100%

100%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTIONOF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED

BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD) NAME(S) OF

ASSOCIATED FIRMS % OF TOTAL

WORK DONE BY YOUR FIRM FROM TO

30. Simulator Building Kuwait Airport

31. Shuaiba, Security Fence Building

32. KNPC Maintenance and Workshop

33. Reverse Osmosis Project Kuwait.

34. Fiber Glass Factory, Kuwait

35. Gasoline Stations

36. Chemical Factory & Stores

37. Fire Station, Shuaiba Kuwait

Damage assessment design and supervision for restarting works

Design Turnkey Project

Design Turnkey Project

Turn-key Project

Full Design

Full Design

Design and Supervision

Design and Supervision

Kuwait Airways

S.A.A.

K.N.P.C.

K.I.S.R. Kuwait

U.T.G. Kuwait

U.T.G. Kuwait

Al Rashed, Kuwait

Ministry of Public Works, Kuwait

1989

1988

1987

1982

1980

1978

1978

1976

1993

1989

1988

1983

1981

1981

1980

1978

180,000

500,000

2,500,000

2,000,000

1,500,000

150,000

2,500,000

125,000

Al-Othman Const.Co. Dabbous Const. Co. Kuwait Projects Co.

100%

100%

100%

100%

100%

100%

100%

100%

INDUSTRIAL PROJECTS

FAHAD AL- AHMED BAKERY KUWAIT

Services Design and Detailed Working Drawing

Architectural Structural, Electro-Mechanical

Tender Documents Construction Supervision

Total Cost KWD 4.5 Million

Design Period - 2014 - 2015

Client Kuwait Flour Mill Company

Consultant Kuwaiti Engineering Group

Project

The project lies in Fahad Al Ahmed Residential area (Block-1). The building i s designed for auto bakery and consists of Basement, Ground floor, First Floor & Roof with a Total plot area of 10000m2

INDUSTRIAL PROJECTS

KUWAIT FLOUR MILLS - SILO

Client Kuwait Flour Mills & Bakeries Company

Consultant Kuwaiti Engineering Group

Project The project Consists of 4 Silos Containing 36 Bins. Height 65M Occupying an Area of 2100 m2 Slip Form Method of Concreting was Employed. Foundation Consisted of 159 Nos.of 1.2 x 1.20M Concrete Piles.20M Depth.

Services

Design and Detailed Working Drawing Architectural Structural Mechanical Electrical

Tender Documents, Construction and Supervision

Total Cost KD 2,500,000

Completed : 2006

INDUSTRIAL PROJECTS

PETROLEUM HYDRO TREATING CATALYST PLANT KUWAIT

Client Kuwait Catalyst Company

Consultant Kuwaiti Engineering Group

Project The project consists of:

1200 m2 Administration building, 5400 m2

Manufacturing plant, 5920 m2

Warehouse, 540m2 Electrical Sub-Station

Services Design and Detailed Working Drawing ArchitecturalStructural Mechanical Electrical Roads and Landscaping Design

Construction Supervision

Total Cost: KD 14,000,000 Project Completed 2001

COMMERCIAL RESIDENTIAL AND OFFICE COMPLEXES

KUWAIT FLOUR MILLS - WAREHOUSES

Client Kuwait Supply CO. S.A.K

Consultant Kuwaiti Engineering Group

Project The Warehouses Complex Consist of 23 Storage Buildings, Executed in Phases. The First Phase Consists of 7 Stores {32.00M2) and The Second Stage 16 Stores (65,000M2). The Buildings are Single•storied Kirby Steel Structural system with RC columns and Block Work Infill. The First Phase Construction included an Administrative block, Workers Rest Area, Mosque, Security Building, Main Plant Room etc. The Store for Milk Products is Provided with AC System.All stores have a Fire Fighting System, Smoke ventilation and External Fire Hydrants for Fire Protection.

Services

Planning and Design

Architectural, Structural, Electro- Mechanical

Tender Document Construction Supervision

Total Cost KD 2.4 million

Phase1 Completed: 2007 Phase 2 in Progress: 2009

INDUSTRIAL P R O J E C T S

KABD BROADCASTING STATION KUWAIT

Client Ministry of Public WorksMinistry of Information

Consultant Kuwaiti Engineering Group in Association with Electro Watt Engineering Ltd.

Project New Broadcasting Building of 16,600 m2 Area Located at Sulaibiya Road Outside Kuwait - Sulaiblya, The Project Consists of 4 Medium Wave Transmitters, 16 Short wave Transmitters, 2 combines and Matri Hall, Electrical Substation, Administration, Lecture Hall, Exhibition Hall and Accommodations.

Services

Design and Detailed Working Drawing

Architectural Structural Electro Mechanical Services Broadcasting Security System Building Automation System Roads Landscaping Tender Documents Construction Supervision

Total Cost KD 5,000,000 Design completed 1997

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

H. PUBLIC & SPORTS FACILITIES:

1.Sabah Al-Ahmed Club for handicap Sports

2.Mosque at Kuwait Flour Mills and Bakeries Co.

Design and Supervision

Design and Supervision

Public Authority for youth and sports-Kuwait

Kuwait Flour Mills and Bakeries Company

2015

2001

Ongoing

Ongoing

30 million

100,000

100%

100%

Design and Final Tender Documents

Kuwait Municipality

1985 1987 2,100,000 100%

Design and Final Tender Documents

Kuwait Municipality

1985 1987 280,000 100%

Design and Supervision

Salhiya Real Estate Company.

1982 1986 1,100,000 100%

3. Regional MosqueFintas Major Center

4. Al-Froud Mosque, Fintas Major Center (500 prayers)

5. Al Salhia New Mosque

6. Sheikh Nasser Mosque Design and Supervision

Late Sheikh Nasser

1979 1981 1,000,000 100%

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

Design and Contraction Supervision

Kuwait Flour Mills and Bakeries Co.

2001 2005 1,000,000 100%

Design and Supervision

Kuwait Airways Corporation, Kuwait.

1986 1987 450,000 100%

Design and Supervision

Ministry of Justice, Kuwait

1986 1996 100%

Final Tender Documents

Kuwait Municipality

1985 1986 19,500,000 100%

Design Salhia Real Estate Co.

1983 1987 100%

Design Kuwait Municipality

1981 1983 4,150,000 100%

7. Carpark for Staff

8. Surface Car Park/Services, Kuwait Airport

9. Al-Othman Commercial and Residential CenterCar Park (350 cars), Kuwait

10.Fintas Major Center2 Basement Car Park,(2715 cars), Kuwait

11.Salhia Car Park(500 cars), Kuwait

12.Salmiya New Center. 2 Car Park (1000 cars), Kuwait

13.Salhia Commercial Complex Car Park (400 cars), Kuwait

Design and Construction

Supervision Salhia Real Estate Company, Kuwait

1977 1980 100%

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED

FIRMS

% OF TOTAL WORK DONE

BY YOUR FIRM

FROM TO

14.Consultancy services &construction services for theeducation buildings in Beirut- Lebanon

Study, Review / Modify Design & Tender Documents. Management & Construction Supervision

Lebanese Government: CDR & AFAED

2008 2014 5 Million Lebanese Engineering Group with QUANTAS Engineering- (SARL) Lebanon

70%

15.Kuwait Autism Center Design and Supervision Ministry of Public works

2003 2007 2,000,000 100%

16.Care Center for the MentallyChallenged

Study, Design and construction supervision

Ministry of Social Affairs and Labor

1994 2004 12,000,000 Norman + Dawbarn Ltd. UK

70%

1981 1983 800,000 100%

1979 1979 250,000 100%

1978 1984 2,000,000 100%

Design and construction supervision

Full Design

Design and Supervision

Full Design 1978 1978 265,000 100%

17.New English SchoolExtension, Kuwait

18.Public Library South, Yemen

19.Teacher's Training Center

20.Ministry of EducationYemen

21.New English School, Kuwait Design and Supervision

Tarek Rajab, Kuwait

Gen. Board for South & Arabian Gulf

M.P.W. Kuwait

Gen. Board for South & Arabian Gulf

Tarek Rajab, Kuwait 1974 1974 250,000 100%

PUBLIC &SPORTS FACILITIES

SABAH AL-AHMED CLUB FOR HANDICAP SPORTS KUWAIT

Client Public Authority for Youth and Sport, Kuwait

Consultant Kuwaiti Engineering Group

Project 1. The project consists of three floors for

different complex offices and reviewer’shalls.

2. Infrastructure works (Roads, assemblageand drainage of storm/sewage water,electrical, telephone and informationsystems.

3. External boundary walls and main gatesconstructions.

Services Design and Detailed Working Drawing

Architectural Structural Interior Electro-Mechanical Documents Construction Supervision

Total Cost KWD 30 Million

Design Period 2015- Ongoing

PUBLIC & SPORTS FACILITIES

CONSULTANCY SERVICES & CONSTRUCTION SERVICES FOR THE EDUCATION BUILDINGS IN BEIRUT - LEBANON

Client

Lebanese Government:

• Council for Development &Reconstruction (CDR).

• Kuwait Fund for ArabEconomic Development(AFAED).

Consultant Kuwaiti Engineering Group / Lebanese Engineering Group with QUANTAS Engineering- (SARL) Lebanon

Project Educational sector development program Lebanon funded by (AFAED). Packages: Schools (6,26,24) – School (7) & School (13) in Beirut. Rehabilitation, Extension andconstruction of new schools. Upgradingsecondary schools with all requiredadministration, classes, libraries, data &computer center, playgrounds & facilities.

Services

Study, Review / Modify Design & Tender Documents. Management & Construction Supervision

Total Cost $16 million

Period: 2008-2014

Completed: Schools (6, 26 & 24)

PUBLIC &SPORTS FACILITIES

SALHIA MOSQUE - KUWAIT

Client Salhia Real State

Consultant Kuwaiti Engineering Group

Project Mosque of 2,000 m2 built up area is located in Kuwait - Salhia. The interior and the marble facade together with the minaret are very carefully designed in the spirit to express Kuwait and especially the Islamic heritage and to suit the architectural environment.

Services

Design and Detailed Working Drawing Architectural Structural Electro-Mechanical (Power Supply, Fire Alarm, Lighting) Mechanical (HVAC, Water Supply) Tender Documents Construction Supervision

Total Cost KD 1,100,000

Project Completed: 1986

PUBLIC &SPORTS FACILITIES

SHEIKH NASSER MOSQUE - KUWAIT

Client Sheikh Nasser

Consultant Kuwaiti Engineering Group

Project Mosque of 2950 m2 built up area is located in Kuwait - Ras - Salmiya. The project consists of a visually unusual modern Mosque with a stepped roof, which is reaching near to the ground. Even the top of the minaret has the same shape. The building is fitting well in the surrounding neighborhood of modern architecture and landscaping.

Services

Design and Detailed Working Drawing Architectural Structural Electro-Mechanical (Power Supply, Fire Alarm, Lighting) Mechanical (HVAC, Water Supply) Tender Documents Construction Supervision

Total Cost KD 1,000,000 Project Completed on: 1981

PUBLIC &SPORTS FACILITIES

TEACHERS TRAINING CENTER - KUWAIT

Client M.P.W

Consultant Kuwaiti Engineering Group

Project - 32 Class rooms- Lab & Workshops- Multipurpose Hall- Administration- Library

Services

Design and detailed working drawings

Architectural Structural Mechanical Electrical Landscape Design

Tender Documents

Feasibility and Economical Studies Construction

Supervision

Total Cost KD 2,000,000

Completed: 1984

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE

AND LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD

(YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF

TOTAL WORK

DONE BY YOUR FIRM

FROM TO

I. ENGINEERING DESIGN:

1.Design & Permitting for Electrical Works At Salmiya Yacht Club

2.Design of External Fire FightingSystem at Solybiah Facilities

Design

Design

Touristic Enterprises Company

Agility - Kuwait

2017

2017

Ongoing

2017

200,000

1,000,000

100%

100%

3.HVAC work order no.EPF-120/LPO/1547

4.Substation for KFM

5.NAS Workshop

Full design of HVAC System

Design and Supervision of Electromechanical works

Design and Supervision of Electromechanical works

* Design and detailed working drawingsArchitectural, Structural, Electrical+ Low Current system includingTelecommunication facilities, Mechanical(HVAC, Plumbing & Fire Fighting)* Tender Documents* ConstructionSupervision

Al-Rashed Holding

Kuwait Flour Mills

National Aviation Services

2015

2013

2014

2007

2000

2015

2014

2015

Ongoing

2001

200,000

250,000

8.5,000,000

1,500,000

100%

100%

100%

100%

100%

2000 2001 3,500,000 ASA Consultants, Egypt 35%

5.Renovation of the existing main building (Telecom)in Kuwait City with new Architectural Finishes and Telecommunication Facilities including value added floors. Total Built Up area 1400M2

6.JO Head Office at Wafra

7.Meridian Hotel15 &16th floors Renovation

8.Telephone Network for Shuaiba Authority, Kuwait

Full design of HVAC System

Design and supervision of Electromechanical works

Design and Supervision

Ministry of Communication

Joint Operations (KOC & TEXACO)

Salhia Real Estate Company

Shuaiba Area Authority

1981 1985 1,000,000 100%

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

1979

1976

1976

1981

1977

1977

16,000,000

5,000,000

6,000,000

AART SETAP

Middle East Consultants

Electrical / Mechanical

1975 1977 20,000,000

1975

1977 1977

1981 3,500,000

6,500,000 Gulf Consulting Office, Kuwait Electrical /

Mechanical

1975 1977 50,000,000

1974 11,000,000 100%

9. Military Hospital, Kuwait

10. Doctor's and Nurse’sAccommodation, Kuwait

11. Safat CommercialComplex Kuwait

12. Farwaniya & Jahra General Hospitals, Kuwait

13. K.I.I.C. Car park andCommercial Office

14. Ministries ComplexKuwait

15. Workers' Town, Kuwait

16. Al-Rashed & AnjariCommercial & Office Complex,Kuwait

Electrical and Telephone Systems

Electrical, Telephone & A/C Design

Electrical & Air- conditioning Design

Electrical and Telephone Co- ordination Electrical, Telephone, A/C Design and Supervision

Team Leaders for Electrical & A/C Design

Electrical and Telephone Design

Electrical and Telephone Design

Ministry of Public Work

Ministry of Public Works, Kuwait

Inherants of Late Sheikh Ahmed Jaber

Ministry of Public Works, Kuwait

K.I.I.C. Kuwait

Ministry of Public Works, Kuwait

K.F.T.C.I.C. Kuwait

Al-Rashed & Anjari, Kuwait

1972 1974 11,000,000 100%

ENGINEERING DESIGN

RENOVATION OF EXISTING TELECOMMUNICATION B U I L D I N G

Client Ministry of Communications

Consultant Kuwaiti Engineering Group

Project Renovation of The Existing Main Building (Telecom) in Kuwait City with New Architectural Finishes and Telecommunication Facilities Including Value Added Floors. Total Built-Up Area 1400 m2

Services Design and Detailed Working Drawing

Architectural StructuralElectrical + Low Current System, Including Telecommunication Facilities, Mechanical (HVAC, Plumbing, Fire Fighting)

Tender Documents Construction Supervision

Total Cost: KD 6,000,000

Design Completed: 2008

ENGINEERING DESIGN

HOTEL MERIDIEN- KUWAIT

Client Salhiya Real Estate Company, Kuwait

Consultant Kuwaiti Engineering Group in Association with ove-Arup. U.K. (Structure Only)

Project Five stars hotel building of 32,800 m2

area of 16 floors. Which is located at Shuhada street in the center of Kuwait. The project consists of 366 bedrooms, 29 suites, Prestigious restaurants, Swimming pool in top floor, Health club, Conference room and large ballroom (with press facilities).

Services

Design and Detailed Working Drawing

Architectural Electromechanical Interior Design

Tender Documents Feasibility and Economical Study Construction Supervision

Total Cost KD 11,000,000

Project Completed: 1981

ENGINEERING DESIGN

MILITRY HOSPITAL - KUWAIT

Client Ministry of Planning and Public Works

Consultant Kuwaiti Engineering Group in Association with AART SETAP

Project A Hospital Building Consisting of 500 Beds with Operation Rooms, Labs and Other Services and Facilities Located in Middle Area Near Six Ring Road

Services Design and Detailed Working Drawing.

Mechanical (HVAC, Water Supply, Drainage, etc.)

Electrical (Lighting, Power, Low Voltage, etc.)

Tender Documents

Construction Supervision

Total Cost KD 16 Million Design Period: 1979 - 1981

Completed 1982

ENGINEERING DESIGN

AL JAHRA GENERAL HOSPITAL - KUWAIT

Client Ministry of Planning and Public Works

Consultant Kuwaiti Engineering Group in Association with AART SETAP

Project A Hospital Building Consisting of 500 Beds with Operation Rooms, Labs and Other Services and Facilities Located in Al Jahra

Services

Design and Detailed Working Drawing

Mechanical (HVAC, Water Supply, Drainage, etc.) Electrical

(Lighting, Power, Low Voltage, etc.)

Tender Documents

Construction Supervision

Total Cost KD 10 Million

Design Period:1975 -1977 Completed 1978

ENGINEERING DESIGN

AL FARWANIYA GENERAL HOSPITAL- KUWAIT

Client Ministry of Planning and Public Works

Consultant Kuwaiti Engineering Group in Association with

AART SETAP

Project A Hospital Building Consisting of 500 Beds with Operation Rooms, Labs and Other Services and Facilities Located in Al Farwaniya

Services Design and Detailed Working Drawing

Mechanical (HVAC, Water Supply, Drainage, etc.) Electrical

(Lighting, Power, Low Voltage, etc.)

Tender Documents

Construction Supervision

Total Cost KD 10.000

Million

DesignPeriod: 1975 -1977

Completed 1976

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

J. REHABILITATION P R O J E C T S :

Kuwait Airways Corporation

1992 1993 900,000

ASA Consultant

100%

Kuwait Airways Corporation

1991 1991 700,000 100%

KREIC/Kuwait Int'l Hotels

1991 1992 800,000 100%

Kuwait Airways Corporation

1991 1991 500,000 100%

Kuwait Airways Corporation

1991 1992 4,000,000 100%

1. Export Cargo Bldg. KAC

2. Kuwait Airways Office Building at Hilali Street.

3. Transit Hotel at the Kuwait Airport

4. Fahaheel Sea Club

5. Miscellaneous rehabilitation works at Kuwait Airport for various buildings.

6. Al-Siddique School

Arch. Struc. + Services Design and Supervision

Design and supervision of rehabilitation work

Damage assessment Supervision of rehabilitation works

Design and Supervision of Rehabilitation works

Project management Design and Supervision

Archi. & Struct. Design

for rehabilitation and change to offices

Ministry of Interior/ Arab Contractor

1991 1992 1,500,000 100%

7. Meridian Hotel (400 rooms)5 Star

Design and Supervision of rehabilitation works

Salhiya Real Estate Co.

1991 1991 3,000,000 50%

REHABILITATION PROJECTS

AIRPORT TRANSIT HOTEL - KUWAIT

Client K.F.T.C.I.C.

Consultant Kuwaiti Engineering Group

Project The Airport Transit Hotel at Kuwait Airport with a built up area of 9,200 m2 and it consists of 200 single bedrooms, a restaurant for 150 persons, a cafeteria for 200 persons, a reception lobby for 200 persons, a TV lounge for 50 persons, a main kitchen and all necessary facilities.

Services

Design and Detailed Working Drawing

Architectural Structural Electro -Mechanical LandscapingInterior Design

Tender Documents

Feasibility and Economical Studies

Construction Supervision

Total Cost US $9 million

Completed in:1986

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

FIRM FROM TO

K. INTERIOR DESIGN:

Design and Supervision

Ministry of Awqaf 2006 2007

N & D, London

100%

Design and Supervision

Public Authority for Agriculture Affairs and Fish Resources

2003 2005 2,000,000 100%

Design and Supervision

Ministry of Public Works

1998 2,000,000 40%

1. Kuwait Center for Autism

2. PAAF Headquarter LooseFurniture

3. Care Center for theMentally Handicapped –Loose Furniture andMedical

4. Khaled Al-Roubayan VillaDesign and Supervision

Khaled Al- Roubayan

1998 2000 500,000 100%

5. JC Penney Collection Storesat Al-Othman & Al-FannarComplexes, Kuwait

Design and Supervision

Al-Sabria Liwa Trading Co. Abu Dhabi

1996 1997 1,900

Design and Supervision

Kuwait Oil Tanker Co.

1995 1995 100,000 100%

Design and Supervision

Ministry of Public Works

1993 1996 500,000 100%

Design and Supervision

KREIC. 1992 1994 250,000 100%

5.

6. KOTC Head Office

7. Audit Bureau Headquarters Building.

8. Transit Hotel Kuwait Airport

9. Arab Towns Organization New Headquarters Design and

Supervision Arab Town Organization

1992 1995 300,000 100%

INTERIOR DESIGN

PUBLIC AUTHORITY FOR AGRICULTURE AFFAIRS & FISH RESOURCES, HEADQUARTERS - KUWAIT

Client P.A.A.F.

Consultant Kuwaiti Engineering Group

Project New Headquarter Atrium Building of 30,000 m2

of 4 Floors Located at Fifth Ring Road Ghazali Street in Kuwait - Rabih. The Project Consists of Office Space an Exhibition Hall of 600 m2, a Conference Hall for 200 Persons Cafeteria, other services and surface parking.

Services Design and Detailed Working Drawing Architectural Structural Interior Electro -Mechanical Roads landscaping

Tender Documents

Construction Supervision

Total Cost KD 2,000,000

Design Period - 1998-2000 Completed 2005

INTERIOR DESIGN

AUDIT BUREAU HEADQUARTERS-KUWAIT

Client Ministry of Public Works

Consultant Kuwaiti Engineering Group in Association with Dar Al Handasah (Shair & Partners)

Project New office building of 11250 m2 area of 14 floors and one basement, which is located at Ahmad Al Jaber Street in the center of Kuwait. The project consists of office space, a conference hall for 200 persons, library, a safety shelter for 500 persons and a car park for 650 cars of 27250 m2 area.

Services Design and Detailed Working Drawing Architectural Structural Electro Mechanical

Tender Documents Feasibility and Economical Studies Construction Supervision

Total Cost KD 500,000 Completed :1996

- .-- ·-- t· - •=--'=-

INTERIOR DESIGN

AIRPORT TRANSIT HOTEL-KUWAIT

Client K.F.T.C.I.C.

Consultant Kuwaiti Engineering Group

Project The Airport Transit Hotel at Kuwait Airport is of built up area of 9,200 m2 and it consists of 200 single bedrooms. a restaurant for 150 persons, a cafeteria for 200 persons, a reception lobby for 200 persons, a TV lounge for 50 persons, a main kitchen and all necessary facilities.

Services Design and Detailed Working Drawing

Architectural Structural Electro-Mechanical Landscaping Interior Design

Tender Documents Feasibility and Economic Studies Construction Supervision

Total Cost KD 250,000 Completed in: 1986

INTERIOR DESIGN

ARAB TOWN ORGANIZATION BUILDING-KUWAIT

Client Kuwait Municipality

Consultant Kuwaiti Engineering Group

Project New office building of 5,820 m2 area, located at the Airport Road in Kuwait Shuwaikh, the project consists of a prestigious hall for 150 persons, several meeting rooms, office area, services and car parks. The Interior and facades are designed in the spirit of Kuwait and Islamic heritage.

Services Design and Detailed Working DrawingArchitectural Structural Electro-MechanicalLandscaping DesignInterior Design and Loose Furniture

Tender Document Construction Supervision

Total Cost KD 300,000

Completed 1995

L I S T O F P R O J E C T S E X E C U T E D B Y K U W A I T I E N G I N E E R I N G G R O U P

BRIEF DESCRIPTION OF PROJECT, TITLE AND

LOCATION

SERVICES PERFORMED BY THE FIRM

CLIENT'S NAME & ADDRESS

PERIOD (YEAR)

TOTAL PROJECT

COST (KD)

NAME(S) OF ASSOCIATED FIRMS

% OF TOTAL WORK DONE BY

YOUR FIRM FROM TO

L. ENVIRONMENTAL ASSESSMENT:

1. PAC Monitoring &Assessment Program for Kuwait result from Iraqi aggression clusters of Marine and Costal, Terrestrial Damages and development and construction of the necessary facilities, laboratories, equipment and data management systems to properly monitor and assess these damages

- EnvironmentalAssessment

- Monitoring- Remediation- Technologies

Assessment- Information

ManagementSystems and relatedservices

Public Authority for Assessment of Compensation (PAAC) & United Nations Compensation Commission (UNCC)

Jan 2002 2007 25,000,000 Consortium of International Consultants (CIC)- USA

SAFEGE – Ingenieurs Conseils- France RSK Environment - UK

15%

2 Gulf war environmental damage assessment for Kuwait (Phase II)

Damage assessment and claims preparation for submission to UNCC

Public Authority for Assessment of Compensation

1995 1999 1,800,900 Ecology and Environment Inc., U.S.A.

30%

3. Gulf war environmentaldamage assessment forKuwait (Phase I)

Damage assessment and claims preparation for submission to UNCC

Public Authority for Assessment of Compensation

1993 1995 900,000 Ecology and Environment Inc., U.S.A.

30%

ENVIRONMENTAL ASSESSMENT

PROGRAM FOR THE MONITORING AND ASSESSMENT OF THE ENVIRONMENTAL CONSEQUENCES OF THE IRAQI

AGGRESSION IN KUWAIT

Terrestrial Cluster

Client Public Authority for Assessment of Compensation (P.A.A.C)

Consultant Consortium of International Consultants (C.I.C) Kuwaiti Engineering Group

Project Among the Kuwait Environmental Claims are certain Claims Which Pertain to Environmental Monitoring and Assessment Programs (the Programs) which Programs Include, but are not Limited to, the Monitoring and Assessment of Marine and Coastal, Terrestrial Damages, as Well as the Development and Construction of the Necessary Facilities, Laboratories Equipment and Data Management Systems to Properly Monitor and Assess these Damages.

Central Environmental Laboratory

Marine and Coastal Cluster

Services

Environmental Assessment Monitoring Remedial Measures Technologies Assessment Information Management Systems and Related Services

Starting Date: June 2002

Completed in: 2007

Total Cost: 25,000,000

ENVIRONMENTAL ASSESSMENT

GULF WAR ENVIRONMENTAL DAMAGE ASSESSMENT FOR KUWAIT- PHASE 1&11

Dying trees because of the crude that covered the farms

Oil wells were torched by the lraq

Client Public Authority for Assessment of Compensation (P.A.A.C)

Consultant Ecology & Environment (E&E) /Kuwaiti Engineering Group

Project Damage Assessment and claim Preparation for Submission to U.N.C.C

Oil fire gushing smoke and flames into the sky

Services Land Underground Water Health Marine Pollution

Cost Phase I: KD 1,800,000 Phase II: KD 900,000

Period Phase I: 1993-1996 Phase II: 1996-1999