INCEPTION REPORT
“Green Urban Lighting”
UNDP-GEF 00074869
Full Size Project
Prepared for UNDP-GEF
Yerevan, Armenia
February 2014
2 “Green Urban Lighting” UNDP-GEF/00074869 project
C o n t e n t
ACRONYMS ......................................................................................................................................................... 3
I. BASIC PROJECT INFORMATION ........................................................................................................ 4
II. PROJECT INCEPTION UPDATE ........................................................................................................... 4
II.1 INTRODUCTION ..................................................................................................................................... 4
II.2 PROJECT OVERVIEW ............................................................................................................................. 5
II.3 PROJECT ACTIVITIES CARRIED OUT OVER THE INCEPTION PHASE ....................................................... 5
II.4 INCEPTION WORKSHOP......................................................................................................................... 6
II.4.1 Discussions Related to 2014 Work Plan ......................................................................................... 8
II.4.2 UNDP-GEF Requirements Update ................................................................................................. 8
II.5 CHANGES IN CIRCUMSTANCES THAT MAY AFFECT PROJECT IMPLEMENTATION .................................. 8
II.6 CIRCUMSTANCES THAT POSE A RISK TO SUCCESSFUL PROJECT IMPLEMENTATION .............................. 9
III. CONCLUSIONS OF THE IW .............................................................................................................. 9
III.1 RECOMMENDATIONS TO THE PROJECT TEAM ....................................................................................... 9
III.2 REVISION OF THE LOGICAL FRAMEWORK MATRIX ............................................................................. 14
IV. SCHEDULE FOR REVIEWS, REPORTS AND EVALUATIONS ................................................ 19
V. LIST OF ANNEXES ................................................................................................................................. 20
ANNEX A. AGENDA OF THE INCEPTION WORKSHOP ....................................................................................... 21
ANNEX B. LIST OF PARTICIPANTS OF THE INCEPTION WORKSHOP ................................................................. 23
ANNEX C. PRESENTATIONS FROM THE INCEPTION WORKSHOP ...................................................................... 27
ANNEX D. MINUTES OF THE INCEPTION WORKSHOP ...................................................................................... 28
ANNEX E. ANNUAL WORK PLAN FOR 2014 .................................................................................................... 32
ANNEX F. CO2 EMISSION SAVINGS CALCULATION ......................................................................................... 38
3 “Green Urban Lighting” UNDP-GEF/00074869 project
ACRONYMS
AUA American University of Armenia
AWP Annual Work Plan
CEO Chief Executive Officer
CIS Commonwealth of Independent States
EE Energy Efficiency
EU European Union
FSP Full-Sized Project
GDP Gross Domestic Product
GEF Global Environment Facility
GHG Greenhouse gases
GoA Government of Armenia
IE International Expert
IW Inception Workshop
LPAC Local Project Advisory Committee
ME Ministry of Economy
MENR Ministry of Energy and Natural Resources of RA
MNP Ministry of Nature Protection of RA
MTE Ministry of Territorial Administration of RA
MUD Ministry of Urban Development of RA
NIS National Institute of Standards CJSC
NGO Non-governmental Organization
PB Project Board
PPG Project Preparation Grant
ProDoc Project Document
R2E2 Fund Armenia Renewable Resources and Energy Efficiency Fund
RE Renewable Energy
RTA Regional Technical Advisor
RoA Republic of Armenia
SEUA State Engineering University of Armenia
SRIE Scientific Research Institute of Energy
TAC Technical Advisory Committee
tCO2e Tons of CO2 equivalent
ToR Terms of Reference
UNDP United Nations Development Programme
UNDP CO United Nations Development Programme Country Office
UNFCCC UN Framework Convention on Climate Change
USAID United States Agency for International Development
USD the U.S. Dollar
WT Workshop-Training on Strategic and Programmatic Issues under UNDP-GEF
Mitigation Programme
YCM Yerevan city Municipality
YSUAC Yerevan State University of Architecture and Construction
4 “Green Urban Lighting” UNDP-GEF/00074869 project
I. Basic Project Information
Programme or project number and title: PIMS 4669 “Green Urban Lighting” UNDP-GEF/00074869
Designated institutions
(Executing Agencies): Ministry of Nature Protection of the Republic of Armenia (MNP)
Implementing agency: UNDP
Project starting date
Originally planned: November 2013 (as approved in FSP proposal)
Actual: the same
Project completion date
Originally planned: October 2017 (approved 48 months duration)
Total budget (US$): GEF: 1 600 000 ;
UNDP: 1 120 000 (including 1 000 000 in kind);
GoA: 320 000 (in kind);
Local Administrations: 7 055 000 ;
Other: 95 000 .
Original: the same
ProDoc signature date: November 8, 2014 by the Ministry of Nature Protection of RA
November 15, 2014 by UNDP Armenia
Date of the Inception Workshop: January 15, 2014
II. Project Inception Update
II.1 Introduction
The project inception phase, lasting 4 months, marks the launch of the implementation of the “Green
Urban Lighting” UNDP-GEF project. Thus far, the following has been achieved.
Local Project Advisory Committee (LPAC) was held on 23th of September, 2013. Based on the result
of discussions and positive feedback from the stakeholders, considering the importance of the project
outcomes for the national policy making process, recognizing its timeliness and consistency with
national and global development goals, LPAC recommended FSP document for further approval by
GEF Implementing Agency and National Implementing Partner.
The Ministry of Nature Protection (MNP) – оn 8th of November 2013, and UNDP Armenia – on 15
th of
November 2013, signed the ProDoc; the AWP was signed on December 31, 2013.
Establishment of project management structure:
In line with the project document the project will be implemented under the UNDP Climate
Change Programme which will ensure smooth start of the project using the well-established
facilities and administrative resources of the Unit. Project Task Leader has been hired based on
a competitive selection process to lead, supervise, and monitor project implementation process
and work under direct supervision of the UNDP Climate Change Programme Coordinator.
According to the ProDoc, the Project Board (PB) consists of the UNDP Environment
Governance Portfolio National Director, Mr.S.Papyan, a representative of government and
implementing partner, the Ministry of Nature Protection; a focal person nominated from the
municipality of Yerevan as main beneficiary and counterpart of the project, Mr.A.Harutyunyan;
5 “Green Urban Lighting” UNDP-GEF/00074869 project
and RR or DRR of UNDP Armenia. The Technical Advisory Committee (TAC) comprises
MENR, MUD, MTE, ME, MNP, R2E2 Fund, SRIE, NIS and YSUAC. The PB activities rely
heavily on the TAC findings with their meetings timed closely to each other.
Initial engagement with partners and stakeholders:
During the inception phase, intensive negotiations were conducted with MNP as the national
responsible partner of the Project and Yerevan city municipality as the Project’s major
counterpart for pilot projects. Importantly, talks were held with city/town municipalities in the
marzes of Armenia and consultations were held with YCM, R2E2 fund and private sector.
II.2 Project Overview
The overarching goal of the project is to save energy and to reduce emissions of greenhouse gases by
increasing energy efficiency of municipal lighting in the cities of Armenia via implementation of
municipal investment programs and national policies. The proposed project is in compliance with the
national priorities to strengthen the economic and energy independence of the Republic of Armenia
by promoting resources efficient and climate resilient growth.
These activities will contribute to UNDP’s goal of increasing access to sustainable energy services by
introducing regulatory and institutions frameworks, promoting technology transfer for extension of
application and market penetration of energy efficient technologies..
The project approach of institutionalizing improved energy efficiency in lighting sector through
introduction of minimum energy performance requirements, standards, regulation, trainings and
demonstration directly contributes to the pursuit of Millennium Goal Number 7: Integrate the
principles of sustainable development into country policies and programmes and reverse the loss of
environmental resources. The project approach also builds on one of the key areas of the UNDP
Armenia Country Programme: to “strengthen synergies of environmental, governance and socio-
economic issues to ensure integrated solutions.”
Lighting is the second largest source of municipal GHG emissions in Armenia (after heating),
accounting for about one-third of municipalities’ GHG emissions and up to 50 percent of their
electricity bill. Urban lighting costs of Armenian municipalities account for more than US $5 million
per annum (power costs and maintenance). Municipal lighting in the capital city of Yerevan accounts
for the largest consumption in the country: about 80 per cent of all urban lighting energy use
nationwide, or about 56,000 MWh/year. At the same time, there is considerable technical potential for
cost-effective efficiency improvements in public lighting in Yerevan and other Armenian cities. Street
lighting power use in Yerevan is 1.3-1.5 times higher than the average street lighting power
consumption in European cities and towns. The vast majority of bulbs used in street lighting in
Yerevan are high pressure sodium bulb (HPS) of 250W capacity (about 93% of total street lights),
whereas in the other cities street lighting is “divided” among three main types of lights, namely HPS
(46%), mercury bulbs (40%) and CFLs (13%).
In pursuit of the objective, the project will deliver the following outcomes:
i) Municipal energy audits and technical capacity-building;
ii) Demonstration projects;
iii) Replication via municipal lighting programs and associated financial instruments;
iv) National policies, codes, and standards on lighting;
v) Project implementation, monitoring and evaluation.
Collectively, these components seek to put in place cornerstone policy instruments at both the
municipal and national level, supported by technical, policy-related, educational, and financial
measures to raise capacity, reduce investor risk, and help assure successful implementation.
II.3 Project Activities Carried Out Over the Inception Phase
The following activities were carried out in the 2013:
6 “Green Urban Lighting” UNDP-GEF/00074869 project
ToR for the Project Task Leader was developed, selection process was completed on competi-
tive basis and the respective contract was signed in November 2013.
International expert (IE) on energy efficient lighting for inception phase was hired.
Multi-year AWP (2014-2017) was developed and adopted by MNP and UNDP, as well as
detailed work plan for 2014 was prepared.
Project TAC establishment initiated by the MNP as the national executing agency.
Project team establishment was initiated, the preliminary list of experts includes:
o International Expert on Energy Efficient Lighting
o Local Expert on Lighting System Audit
o Local Expert on Municipal EE Lighting Pilot Projects
o Local Expert on Lighting System Audit
o Local Capacity Building and Training Specialist
o Local Expert on Municipal EE Lighting Pilot Projects
o Local Expert on Public Outreach
o Local Expert on Energy Efficient Lighting Market and Technologies
o Local Capacity Building and Training Specialist
o Local Expert on Economy and Finance
o Local Expert on Pilot Projects Monitoring
Preparation for and organization of the Inception Workshop was completed.
The Project’s Task Leader held talks with the Mayors of Vanadzor city and Spitak and
Alaverdi towns, to verify information on the potential pilot projects to facilitate identification
of the pilot project sites in the respective communities (November 2013).
Monitoring and reporting documentation was developed in accordance with the UNDP
Project Results and Resources Framework requirements: quarterly progress reports for 2013
were prepared and submitted to GEF and MNP; Annual Standard Progress Report was
developed, submitted and presented at the UNDP Outcome Board on December 3, 2013.
The Logical Framework Matrix was revised substantially based on recommendations of
Regional Technical Advisor (RTA) and the IE; the revised LogFrame is included in section
III.2 below.
The ProDoc, IW information and related materials were posted on a separate web-page of the
Project integrated into the web-site of the Climate Change Information Center of Armenia
(http://www.nature-ic.am/green-urban-lighting/).
II.4 Inception Workshop
The Inception Workshop (IW) took place on 15th January, 2014 in Yerevan, Armenia. The IW was co-
chaired by Mr.A.Harutyunyan, Minister of Nature Protection of the RA, Mr.B.Busetto, UN RC,
UNDP RR, Mr.K.Areyan, First Deputy Mayor of Yerevan city. The IW was led by the RTA on
Energy, Infrastructure, Technology and Transport of UNDP Regional Centre for Europe and the CIS.
The 94 participants included representatives of PB, UNDP RBEC and several COs, relevant
government agencies, town/city municipalities, scientific and educational institutions, private sector,
international organizations and other interested parties – current and potential partners considering the
recent developments in the sector. During the IW, the Project implementation approaches were
discussed and approved of as based on the ProDoc. The purpose of the IW was to present jointly with
stakeholders the project management arrangements, discuss the Project’s implementation approaches,
and identify the key areas of cooperation. In addition, the agenda was discussed with the RTA and
invitations were sent to similar projects’ implementing UNDP COs in Russia, Ukraine and
Kazakhstan, and representatives of “Philips” company and UNEP en.lighten.
Presentations of participants from UNDP COs emphasized the identified gaps and lessons learned.
The GEF-oriented outcomes of the similar projects in Eastern Europe were briefly presented by the
RTA. The international expert presented the best practice in improving energy efficiency and ensuring
7 “Green Urban Lighting” UNDP-GEF/00074869 project
energy saving in urban lighting, including a reference to an Australian energy efficient street lighting
trial in 2008-2012.
The participants greeted inception of the project implementation and expressed their willingness to
support the project activities.
Global transition to Energy Efficient Lighting: Guidance for Specialists UNEP publication was
reprinted in limited numbers (in Russian) and provided to the Project’s key partners. The package
presented to the participants included CDs with the said publication along with the ProDoc brief and
at hand documents to all the participants.
The IW agenda is included in the Annex A. The list of participants is included in Annex B.
Presentations at the IW are listed in Annex C (provided electronically). The IW materials are shared
via Events page at Climate Change Information Center of Armenia web-site (http://www.nature-
ic.am/green-urban-lighting-events/)
The IW participants considered the Project’s implementation approaches acceptable in general with
no major clarifications or modifications needed. The following remarks, comments and suggestions
were recorded, which have to be taken into consideration during the project implementation as much
as possible:
It is important to avoid duplication, repeat the work and activities planned under other donor
assistance projects, as well as to ensure timely communication on project plans and outputs
with counterparts;
The UNDP COs representatives from similar energy efficient lighting projects in Ukrainm
Kazakhstan and Russian Federation invited for the IW expressed their willingness to share their
experience in identifying cost-effective options for pilot projects, to present their lessons
learned and good practice followed, including their publications to be used as a basis for the
project’s similar tasks;
It is desirable to cover different communities with the demonstration component of the project.
Mayors of two towns expressed their willingness to co-finance the cooperation;
It was proposed to consider co-financing opportunities through involvement of environmental
subventions provided to the communities for implantation of environmental projects, into a
potential financial mechanism to be established for funding energy efficiency improvement in
lighting sector;
Involve corresponding specialists and/or private sector representatives in Technical Advisory
Committee meetings when needed;
State Engineering University of Armenia proposed cooperation framework for introduction of
energy efficiency lighting technologies as a separate course at one of their departments;
A private company proposed a cost-sharing option for establishing a laboratory for testing and
certification of lighting appliances (joint funding of equipment procurement by the company
and the project and operation by a third party);
Proper planning and implementation of the pilot project activities should be done to ensure their
replicability;
It is desirable to initiate demonstration component as soon as possible in order to provide
enough time for on-site monitoring and analysis of the outcome;
Importance of conducting trainings on EE lighting is mentioned.
The minutes of the IW are included in the Annex D and shared with the stakeholders.
Following the IW, the Workshop-Training on Strategic and Programmatic Issues under UNDP-GEF
Mitigation Programme (WT) was organized by the RTA and held in the UN House on January 16,
2014. UNDP CO representatives in Armenia, Russia and Kazakhstan, UNDP Armenia Environmental
Portfolio project coordinators, and national and international experts took part in the WT. The key
lessons learned during several years of GEF-funded projects’ management were presented by the
RTA. WT focused on GEF outcome relevant issues and LogFrame compilation in support to the
appropriate long-term positioning of UNDP in mitigation sector. The major recommendation of the
8 “Green Urban Lighting” UNDP-GEF/00074869 project
WT was to keep the indicators adequate and measurable, the baselines reliable and accurate, the
targets realistic and time-bound etc. In general, the LogFrame formulations should be concise and
GEF outcome oriented to facilitate and clearly demonstrate their necessary linkages with achieving
global targets set forth for the respective GEF focal area.
II.4.1 Discussions Related to 2014 Work Plan
Following the IW, a meeting of the International Expert with the YCM as the project’s major
beneficiary was held to update priorities, WP, pilot projects and financial commitments of the YCM
towards establishing an Energy Efficiency Fund from savings gained through the pilot projects. The
annual work plan 2014 of the Project was outlined during the IW and the follow-up meetings with no
substantial comments/remarks received (see Annex E).
II.4.2 UNDP-GEF Requirements Update
During the IW and the WT the participants were updated on the GEF requirements and regulations
regarding the project implementation, including: monitoring and evaluation requirements (adaptive
management, progress monitoring, progress reporting, evaluation, budget), risk management
(environmental, financial, operational, organizational, regulatory, political, etc.), UNDP-GEF project
implementation responsibilities; monitoring and evaluation responsibilities; changes allowed in the
project, etc.
II.5 Identified changes to be considered in the project baseline and targets
Baseline
During the inception phase discussions it was agreed that the baseline of the project should be
amended to incorporate also а new indicator representing specific power consumption per one lighting
fixture (Watt/fixture). This will enable accounting of the actual project impact by making more
precise estimation of improvement of street lighting efficiency, rather than just basing on energy
consumption data which will incorporate the natural growth of the street lighting stock and changes to
the national electrical grid emission factor.
At the same time it was decided to address the problem of suppressed demand (i.e. the reduced level
of public lighting services that do not meet the requirements of lighting standards because of low
quality or inappropriate operation of lighting equipment) during baseline situation assessment via
introduction of respective correction factors that will allow bring baseline situation in compliance
with the requirements of acting lighting norms and standards.
Hence, the project baseline will be accurately established based on available statistical information,
surveys, actual measurements of power consumption, illumination level and other parameters made
within scopes of energy audits, application of the above mentioned correction factors.
Targets
During the consultations held with the Yerevan city municipality within the Inception phase, it was
identified that LED-based street lighting is considered as a priority technology to be tested under the
pilot projects. In particular, the Municipality proposed to implement a LED-based street lighting
demonstration project on one of the major avenues involving about 884 fixtures. Given the reduced
number of fixtures affordable within the budget due to the relatively high capital cost of LED lighting
technologies, the initially estimated direct energy saving from implementation of pilot projects was
revised and reduced accordingly: from 1.4 GWh/y to 1.2 GWh/y.
In order to bring the project target setting in line the latest GEF-STAP Guidelines on GHG emission
reduction from energy efficient projects it has been decided to revise the project target via joining
direct energy savings from demonstration projects and indirect energy savings from replication of
demonstration projects into a one group of direct energy saving.
For more details please see Annex F.
Barriers analysis
9 “Green Urban Lighting” UNDP-GEF/00074869 project
No change in the main barriers was recorded within the Inception phase of the project as compared to
the ProDoc.
II.6 Circumstances that Pose a Risk to Successful Project Implementation
No objection arose and no recommendation was delivered per the project related risk categories as
spelled out in the ProDoc during the inception phase. In accordance with the UNDP-GEF
requirements, Logs were prepared for the project, including identification of risks, their impact and
probability, and the respective management response (see Annex F).
III. Conclusions of the IW
III.1 Recommendations to the Project Team
Based on the project inception review carried out at the IW (section II. above) the general
recommendations to the Project Team were the following:
The detailed WP 2014 and the LogFrame should be revised and amended in accordance with
the provided recommendations of RTA and IE (see below);
The Inception Report should be prepared for submissions after the IW and must follow the GEF
template provided and submitted to the UNDP CO;
The 2014-2017 multi-year AWP shall be revised and the AWP for 2014 be subjected to a
revision based on the changes in the pilot project implementation timelines.
The RTA’s recommendations concerned the following:
In selection of pilots, visibility issues of the project’s impact must be considered and discussed
and agreed with YCM;
Financial sustainability of the proposed and piloted technologies must be ensured through the
relevant legal/regulatory improvements;
Timely planning of the study tour to Eastern Europe, including ToR elaboration and submitting
an application to leverage respective funds from Czech Trust Fund or Slovak Aid is advised;
Indicators set in the Logfram shall be adequate and measurable, baseline shall be reliable and
accurate and targets shall be realistic and time bound;
The lessons learned and experience of the UNDP lighting projects in the CIS countries must be
studied and considered by project team while planning project activities;
The educational and public outreach materials can be utilized as appropriate;
The resources and networking opportunities with UNEP en-lighten programme must be utilized
to the most practical extent possible;
Direct energy saving and associated GHG emissions reduction shall be estimated by impact of
savings and reductions achieved both from pilot projects implemented under GEF funding and
from replication of piloted activities and introduced technical assistance.
The IE’s recommendations to the Project Management included:
Technical Capacity Building and Stakeholder Engagement
The critical spine to the entire project is technical capacity building and there is no better way
to achieve this with key representatives from stakeholders than by having them gain practical
experience by participating in the implementation of the project. The two main areas where
capacity building will be required are technical operations and financial operations/modelling.
Therefore, a Financial Working Group and a Technical Working Group have to be established,
with each Working Group comprising of representatives from the Project team, local
independent experts (one technical expert for TWG and one finance expert for FWG),
international independent expert (as appropriate) and Yerevan Municipality representatives
(including Yerevan Illumination Company and department responsible for construction works),
10 “Green Urban Lighting” UNDP-GEF/00074869 project
representatives from 3 other municipalities (selected by likelihood of them conducting future
pilots or commencing transformation) and representatives of the Ministry of Energy and
Natural Resources of RA.
These two working groups will take ownership, contributing to the decision-making processes
during project implementation, and ultimately provide endorsement of findings and adopted
practices. Documentation of the decision-making processes undertaken and procedures of
technical analysis of lamp performance and financial modelling within the working groups will
become important resources for the continued roll out of green urban lighting throughout the
Republic of Armenia.
Well-structured and coordinated pilots will provide a suite of documentation for training and
ensuing transformation of street lighting to feasible energy efficient lamp technologies.
Demonstration Projects
Before changes to urban lighting practices can be proposed with justification, a detailed
understanding of the baseline (current) situation is required. This entails gaining an insight into
the technical and financial operations (a business profile) of urban lighting within the
municipalities. To do this a municipal lighting service audit, not just an energy audit, is
required. The terms of reference for providing such a service should include obtaining
information in relation to: installation requirements, lighting surveys, maintenance practices,
procurement practices and financial aspects (annual). Analysis of the lighting audits will
provide an insight into the opportunities for improving the energy efficiency and cost reduction
of operating the urban lighting (for more information please see the Mission Report presented
in Annex H).
Another mechanism that could be utilized is the street lighting tool developed by SEAD, the
Super-Efficient Equipment and Appliance Deployment (SEAD) initiative. SEAD is an initiative
under the Clean Energy Ministerial and the International Partnership for Energy Efficiency
Cooperation and aims to make it easier for governments and the private sector to reduce energy
demand and carbon emissions.
In street lighting, the problem is that with new fixture choices, wattage and light distribution
classifications have less correlation with fixture performance on a specific road. Improved
performance and energy savings depend on proper fixture selection. The street lighting tool
provides simplified photometric analysis, integrated with energy and life cycle cost
considerations, to allow lighting specifies to find better fixtures for their lighting upgrades. The
latest version (version 1.6.0) also includes financial analysis in the form of a “Return on
Investment”, ROI, calculated for each year. This new feature will assist with the assessment of
the feasibility of the piloted lamp technologies and future technology transformations by
verifying its applicability to the Armenian situation.
The currently available information for street lighting lamp stock in the Republic of Armenia is
very limited. Updating this information through a questionnaire survey to the municipalities
supplemented by expert assessment would be beneficial to the planning of future pilots and
understanding the opportunity for financial and energy efficiency improvements in their
operations. It also provides an opportunity to promote the “Green Urban Lighting Project” and
foster engagement by the municipalities.
The energy efficiency opportunities will be determined by evaluation of the technical features
of alternate lamp technologies and their suitability for replacing existing lamps in the local
environmental (e.g. temperature, vibration & humidity) and electricity supply (voltage spikes &
drops) conditions. These technical features include such parameters as: white light appearance,
Colour Rendering Index (CRI), lamp efficacy, OMR cost, capital cost, lamp survival, lumen
depreciation and lamp life.
Cost reduction opportunities will be determined by evaluation of the asset (including
procurement practices) and electricity costs, and predicted changes to maintenance practices
(frequency of lamp/fixture replacements and cleaning). In terms of a pilot, all of these elements
11 “Green Urban Lighting” UNDP-GEF/00074869 project
must be recorded in some form of work log to allow a full and proper financial analysis of the
adoption of a new lamp technology to be undertaken.
A Technology Selection Report should then document the process up to and including
preliminary selection of lamp technologies for the pilots. A request for information forms the
next step of the procurement process this will ensure that manufacturers/suppliers are provided
the opportunity to inform the Technical Working Group of any lamp technologies not currently
considered. Following an analysis of the information provided in this process, manufacturers/suppliers are
to be given a further opportunity to inform Technical Working Group members of available
technologies through a Supplier/Manufacturer Workshop. The final decision on the lamp
technologies to be piloted will have then been informed based on information provided through
a Public Request for Information and a Supplier/Manufacturer Workshop. This process will
ensure that the selection process considers all relevant information in its decision making
process.
The procurement of lamps should be publicly offered for tender in the weeks following the
workshop. Even though luminaires will be procured, the pilot monitoring will only be in
relation to the performance of the lamp technology, not the brand. This is an important
philosophy to remain mindful of with any pilot demonstration, otherwise the competition to be
the supplier of the lamps for the pilots can damage future market competition. Therefore, there
is to be no commercial advantage (inside running) for future projects to the supplier of the
luminaires or lamps for the pilots. That is, the pilots are promoted as being based on the lamp
technology (not brand) performance only, so that other quality lamp manufacturers who are not
selected for the pilots will still be able to benefit from the results of the trial, as the trial data
should be made public. The tender specifications should state a requirement for the supply of:
independent accredited laboratory reports of lamp/luminaire performance
lighting design plans verifying compliance with specified lighting requirements for the
nominated pilot sites
a satisfactory warranty
commitment to availability of replacement components
For LED products, evidence of compliance to IEA 4E SSL Outdoor Lighting Tier 2
Performance levels.
A completed luminaire information form to assist the tender review panel should also
accompany a tender submission (sample form is given in the Mission Report).
Once the inefficient lamp technologies that it is proposed to replace have been identified,
suitable pilot sites for monitoring and demonstrating the energy savings and financial feasibility
of such a technology change need to be identified. The criteria for selecting these pilot sites
should include consideration for:
Temperature, humidity and wind (vibration) extremes
Voltage supply variations (voltage spikes and voltage drops)
Typical road lighting configurations (including lighting level requirements, pole heights,
road widths)
Separate electrical feed to pilot light poles (exclusive of billboard and commercial signage
lighting) to enable energy monitoring
Ability to conduct lighting level audit (physical measurements) on road during pilot period
Conspicuity of the pilot to the general public for promoting the energy efficiency projects
The pilot site to be typical for labor practices involved with the maintenance of the
poles/fixtures. (i.e. no excessive degree of difficulty associated with accessing the
poles/fixtures) This is so that maintenance costs documented from the pilot are indicative
of typical installations allowing for reasonable financial analysis.
Any pilot sites and replacement lamp technologies that have already been proposed for
upcoming demonstrations scheduled in the first 12 month work plan, should be ratified by the
Working Groups, using the processes outlined above. This will secure stakeholder support and
12 “Green Urban Lighting” UNDP-GEF/00074869 project
provide documentation of the process that will become part of the pilot/transformation
establishment procedures and training material for municipalities beyond Yerevan.
Monitoring of the pilots should be conducted on a scientific measurement basis, which will
require a factoring in of a cost within the pilots. This monitoring must be reliable and transparent
measurement of key lamp performance criteria of and therefore conducted under the supervision
of a local independent competent lighting professional. This monitoring will entail:
Periodic in-situ light and color measurements (this will require some traffic control during
measurement) with calibrated equipment
Energy consumption monitoring (either at single poles or, if possible to isolate, the entire
distribution of the pilot area) with calibrated equipment
Weather data (temp, humidity, wind) for pilot location (possibly acquired from the Bureau
of Meteorology)
Installation, failure and maintenance logs (dates, times, pole location)
Failure cause analysis (failed lamps/fixtures should be recovered and returned to workshop
for failure cause analysis)
All data should be collected as automatically as feasible to ensure data integrity (e.g. a data-logger
for energy consumption). Data should be downloaded frequently (monthly) for security purposes
and so that analysis can be aggregated and monitored throughout the duration of the pilot. This
assists with identifying either data collection or lamp operation issues before an entire pilot
project is compromised.
The periodic lighting surveys along with weather and electrical supply conditions provide good
information to facilitate predictive lumen depreciation performance and lamp survival statistics.
The reports should be delivered in a manner that provides independence, objectivity and
technology generality (in terms of non-brand specific) so the results can be applied, without
favor, to as many situations/locations as appropriate.
The project has funds for asset changeover for the pilots proposed within the Green Urban
lighting Project. Identifying funding opportunities for the enduring sustainability of the street
lighting transformation is a critical component to this project. The funds within this project are
significant enough to provide the opportunity, (after robust technology assessment and
operational finance modelling) for an ongoing fixed budget commitment from the Municipality
of Yerevan to achieve savings that are reinvested into a rolling energy efficient technology
upgrade of the streetlight assets. This will be an effective demonstration of an initial investment
providing an increasing return.
During the project, other finance mechanisms for obtaining the initial stimulus funds need to be
discovered and promoted. Another alternative mechanism worthy of consideration, which does
not require a significant initial financial outlay, is the outsourcing (contracting) to a 3rd
party
(i.e. commercial entity) for the provision (ownership, operation and maintenance) of street
lighting to a municipality. The Finance Working Group could initially examine this model
(with prospective suitors) prior to facilitating a demonstration with an entire municipality. One
private entity providing such a service is Citelum (http://www.citelum.com/en).
Replication of Municipal Lighting Programs
There are three key steps to the replication of municipal lighting programs: (i) Detailed
knowledge of the baseline stock model, (ii) A methodology (with supporting documentation
and templates) and trained personnel for assessing the feasibility (financial and technical) for an
energy efficient technology upgrade, and (iii) Seed funding to deliver the stimulus finance for
the initial partial asset upgrade that creates the savings to establish the rolling fund for
progressive asset upgrades.
All three of these steps have been well covered above, but this highlights the necessity for all
steps before a municipal lighting program can be successfully initiated.
13 “Green Urban Lighting” UNDP-GEF/00074869 project
National Policies, Codes, and Standards on Lighting
In order to justify the adoption of energy efficiency standards and codes for the purpose of
energy saving and associated greenhouse gas reduction, a relatively accurate stock model of the
lamps in use is required.
In developing a national stock model for lamps used in the residential sector for this project, it
was identified that there was very little data that could be sourced to assist with the required
calculations for either of the accepted approaches to modelling. Using a top down approach, the
percentage of electricity used in the residential sector (as opposed to sectors such as industrial,
commercial and rural) is required along with the percentage of household electricity consumed
by lighting (as opposed to heating, cooling and appliances). No figures could be sourced for the
latter of these parameters and the general consensus of the project team is that the values
published for the European Union, USA, Australia and global are lower than could be expected
in the republic of Armenia, (see Mission Report). Using a bottom up approach, details are
required of the typical lamp inventory for a home in the Republic of Armenia and the typical
hours of use for each lamp. Again, none of this information appears to be available.
Any implementation of an energy efficient lamp phase in will require a detailed understanding
of the lamp stock currently in use and any actual or perceived barriers to such a transition.
It is recommended that a phone survey be conducted on a selected sample of homes in various
demographic regions of the Republic of Armenia in to obtain the necessary information to build
a representative residential stock model and hours of use by room type. Questions should also
be designed to gain an insight into potential barriers to an energy efficient lamp transition.
These questions may need some initial market research to identify the key issues to engage on
(e.g. price, light color, life etc.).
An energy audit could also be conducted on a smaller sample set of homes to obtain the
percentage of electricity consumed for lighting in homes. This would then allow verification of
a calculation of the national residential lighting energy consumption by both a top-down and
bottom-up approach.
Another key strategy to implementing new national standards and codes in energy efficient
lighting is to consider harmonizing with neighboring or trading economies. This will facilitate
trade and maintain market competition in lighting products. It is recommended to conduct a
review of the programs for energy efficient lighting equipment in various countries (e.g. CIS
countries, EU, China, USA.) for the last 5 years, including the analysis of the regulatory basis
of the programs (legislation, standards in force, methodologies accepted) and the tendencies of
their harmonization or transformation.
Other Considerations
Efficiency and quality of LED-based street lighting products is improving constantly along
with gradual reduction of technology costs. Hence, piloting of this technology at a later stage
of the project may result in higher cost efficiency due to possibility of procurement of street
lighting equipment with better energy performance and relatively lower price.
International practice shows that after adoption of appropriate legislation the process of
complete phase-out of incandescent lighting usually takes quite long (sometimes up to 10
years). This shall be taken into consideration for evaluation of indirect energy saving and
GHG emission reduction due to adoption and implementation of similar legislation.
Evaluation of energy saving in the residential sector due to implication of new norms on EE
lighting (including phase-out of IL) shall consider availability of comparable (in terms of
price and application) alternative lighting technology (e.g. halogen) on the local market, as
well as need for additional effort to change in consumer behavior.
14 “Green Urban Lighting” UNDP-GEF/00074869 project
III.2 Revision of the Logical Framework Matrix
The table below gives a comparison between indicators, baseline, targets, sources of verification, and risks and assumptions included in the Project Document and
those initiated at the Workshop-Training on Strategic and Programmatic Issues under UNDP-GEF Mitigation Programme (following the IW; held on January 16,
2014) and agreed in the immediate follow-up of the IW in close cooperation with the International Expert.
Indicator Baseline Targets: End of Project Source of verification Risks and Assumptions
as in the
ProDoc
as per the IW
amendments
as in the
ProDoc
as per the IW
amendments
as in the ProDoc as per the IW
amendments
as in the
ProDoc
as per the IW
amendments
as in the
ProDoc
as per the
IW
amendments
Project
Objective
To remove
barriers to
energy-
efficient
lighting in
Armenia, by
means of
technical
assessment,
facilitation of
financing,
and
development
and
implementati
on of
municipal
programs and
national
policy
Quantity of
energy
saved and
GHG
emissions
avoided
no change
recommen-
ded at this
time
40 GWh of
electricity
consumed for
street lighting
in 2011,
accounting
for about
16,000
tonnes of
CO2
emissions.
550 GWh
consumed for
residential
lighting in
2011,
accounting
for about
220,000
tonnes of
CO2
emissions
Street
lighting:
40 GWh of
electricity
consumed for
street lighting
in 2011,
accounting
for about
16,000 tons
of CO2
emissions.
Average
fixture power
consumption
is 210W in
2011.
Residential
lighting:
550 GWh
consumed for
residential
lighting in
2011,
accounting
for about
220,000 tons
of CO2
emissions.
Direct energy
savings of 1.4
GWh per year
from
demonstration
projects (560
tonnes of CO2
emissions)
Indirect energy
savings of 20
GWh per year
from
replication of
demonstration
projects via
municipal
programs (8000
tonnes of CO2
emissions)
Indirect energy
savings of 125
GWh per year
from
implementation
of national
lighting policy
(50,000 tonnes
of CO2
emissions)
Direct energy
savings of 1.2
GWh per year
from
demonstration
projects (474
tonnes of CO2
emissions)
Direct energy
savings of 20
GWh per year
from replication
of demonstration
projects via
municipal
programs (8000
tonnes of CO2
emissions).
Indirect energy
savings of 125
GWh per year
from
implementation of
national lighting
policy (50,000
tonnes of CO2
emissions)
Direct
energy
savings and
savings from
municipal
programs:
meter
readings and
power
company
invoices.
Savings
from
national
policy:
calculations
based on
regulatory
requirement,
data from
national
agencies and
suppliers on
import and
other market
indicators
Reports on energy
audits conducted by
the project (baseline
data verification,
adjustment to the
required lighting
standards)
Reports on GHG
reduction according
to the GEF
Guidelines.
Pilot project
monitoring reports.
Survey reports on
status of municipal
street lighting done
at the project
midterm and last
year.
Residential sector
survey reports on
indoor lighting.
Achievemen
t of these
targets
depends on
adoption and
timely
implementati
on of
municipal
programs
and national
policies,
which in
turn require
sufficient
political will
and
financing.
no change
recommen-
ded at this
time
15 “Green Urban Lighting” UNDP-GEF/00074869 project
Indicator Baseline Targets: End of Project Source of verification Risks and Assumptions
as in the
ProDoc
as per the IW
amendments
as in the
ProDoc
as per the IW
amendments
as in the ProDoc as per the IW
amendments
as in the
ProDoc
as per the IW
amendments
as in the
ProDoc
as per the
IW
amendments
Outcome 1
Municipal
energy audits
and technical
capacity-
building
Number of
municipal
energy
audits
conducted
Number of
specialists
and agency
representati
ves trained
Methodolog
y for ener-
gy/lighting
audit
Number of
municipal
lighting
systems
energy
audits
conducted
no change
recommen-
ded at this
time
Public media
exposure
Comprehensi
ve energy
audits are not
part of
normal
practice for
public
lighting in
Armenia
No
specialized
training on
EE lighting is
offered in
Armenia
Lack of
methodology
for assessing
the feasibility
(financial and
technical) of
an energy
efficient
lighting
technology
upgrade
Municipalitie
s are not
aware of
energy saving
potential in
lighting
sector
No
specialized
training or
training
materials on
EE lighting is
offered in
Armenia
Limited
broadcasting
of
information
on EE
lighting
At least 10
comprehensive
audits of public
lighting
completed in
Yerevan and
other cities.
Training on EE
lighting
delivered to the
municipal
specialists and
agency
representatives
in Yerevan and
at least 10 other
cities
By the project
midterm the
methodology will
be established and
shared with
municipalities
At least 10
comprehensive
audits of public
lighting
(including pilots)
completed in
Yerevan and other
cities (including
baseline analysis
and
recommendations
for improvement)
At least 20
specialists from
private sector and
municipalities are
trained on EE
lighting and
energy audit
Media releases on
outcomes of each
pilot. Awareness
raising materials
available for
general public
Completed
audit
documentati
on
Training
materials,
participant
rosters,
summaries
of
proceedings
Project annual
reports.
Methodology guide.
Audit reports
Public outreach
materials and
publications
Project web-site
Not
observed
no change
recommen-
ded at this
time
16 “Green Urban Lighting” UNDP-GEF/00074869 project
Indicator Baseline Targets: End of Project Source of verification Risks and Assumptions
as in the
ProDoc
as per the IW
amendments
as in the
ProDoc
as per the IW
amendments
as in the ProDoc as per the IW
amendments
as in the
ProDoc
as per the IW
amendments
as in the
ProDoc
as per the
IW
amendments
Outcome 2
Demonstratio
n projects
Pilot projects
yield cost-
effective
energy
savings,
raising the
confidence
and capacity
of investors
and decision-
makers about
EE lighting
Efficiency
and energy
savings of
installed
EE lighting
Share of
LED in
demo-
projects
no change
recommen-
ded at this
time
Various
levels for
existing types
of lighting –
baseline
technologies
include older
250W HPS
lamps, 400W
mercury-
vapor lamps,
incandescents
and
fluorescent
tubes.
(Baselines to
be updated
during the
inception
period.)
The majority
of fixtures in
municipal
outdoor
lighting
sector
incorporate
inefficient
250W HPS
lamps or
400W
mercury-
vapor lamps.
The indoor
lighting
sector is
dominated by
inefficient
incandescent
lamps and
fluorescent
tubes.
At least five
demonstration
projects
completed,
covering
various
technologies
including
LEDs, and
various
applications
including both
street lighting
and buildings.
Direct energy
savings of 1.4
GWh per year
100% LED for
new outdoor
and indoor
lighting.
5% LED for
outdoor
lighting
retrofits
At least five
demonstration
projects on a
number of
efficient lighting
technologies
completed for
indoor, outdoor
and street
lighting.
Direct energy
savings of up to
0.95 GWh per
year by
completion of all
pilots (subject to
final selection of
pilot size and
technologies)
100% LED for
outdoor (park)
and indoor
lighting pilots
40% LED
included in street
lighting pilots
Field
verification,
metering,
and other
documen-
tation
Field verification,
metering, and other
documentation
Project reports and
audits.
Fulfillment
of the target
will depend
on planning,
financing,
and
implementati
on according
to strict
timetables
agreed upon
by the
project and
its partners.
Fulfillment
of the
target will
depend on
planning
(e.g. final
selection
of pilot
size and
technolo-
gies),
financing,
and
implement
ation
according
to strict
timetables
agreed
upon by
the project
and its
partners.
17 “Green Urban Lighting” UNDP-GEF/00074869 project
Indicator Baseline Targets: End of Project Source of verification Risks and Assumptions
as in the
ProDoc
as per the IW
amendments
as in the
ProDoc
as per the IW
amendments
as in the ProDoc as per the IW
amendments
as in the
ProDoc
as per the IW
amendments
as in the
ProDoc
as per the
IW
amendments
Outcome 3
Replication
via municipal
programs and
associated
financial
instruments
Municipal
lighting
programs
lead to
widespread
deployment
of EE
lighting and
associated
energy
savings
Adoption
and
financing
of
municipal
programs
for EE
public
lighting
Energy
savings
from these
programs
Financial
commitmen
ts for
energy-
efficient
municipal
lighting
Municipal
programs for
EE public
lighting
no change
recommen-
ded at this
time
Municipal
programs for
EE public
lighting are
desired but
not com-
prehensively
designed,
financed, or
implemented
no change
recommen-
ded at this
time
Municipality of
Yerevan
develops and
adopts program
for upgrades of
municipal
lighting, with
secured
financing
Similar
programs are
adopted in at
least five other
cities of
Armenia
Savings of 20
GWh per year
from municipal
lighting
programs
US $10 million
for energy-
efficient
municipal
lighting secured
Municipality of
Yerevan develops
and adopts
program for
upgrades of
municipal
lighting.
Similar programs
are adopted in
other cities of
Armenia
Savings of 20
GWh per year
from municipal
lighting programs
US $10 million
for energy-
efficient
municipal lighting
secured.
Establishment of
financing
mechanisms for
Yerevan and other
municipalities
(e.g. revolving
fund) from
savings achieved
from piloted EE
measures.
Support in
preparation of
funding proposals
(including tenders
for ESCOs) for
cities of Armenia
Official
documenta-
tion of
adoption of
programs
and
financing
agreements.
Municipal plans on
EE lighting upgrades
Established separate
account/
budget line in
Yerevan Lighting
Company for
funding of EE
lighting projects/
upgrades.
Number of
investment proposals
applied for funding
Adoption of
municipal
programs
requires
sufficient
funds from
municipal
budgets
and/or
public and
private
sources of
financing
no change
recommen-
ded at this
time
18 “Green Urban Lighting” UNDP-GEF/00074869 project
Indicator Baseline Targets: End of Project Source of verification Risks and Assumptions
as in the
ProDoc
as per the IW
amendments
as in the
ProDoc
as per the IW
amendments
as in the ProDoc as per the IW
amendments
as in the
ProDoc
as per the IW
amendments
as in the
ProDoc
as per the
IW
amendments
Outcome 4
National
policies,
codes, and
standards on
lighting
New national
policies
mandate
significantly
greater
energy
efficiency and
ensure
product
quality for
lighting,
particularly
in residential
buildings
Adoption
and entry
into force
of phase-
out of
convention
al
incandesce
nt lighting
Adoption
and
implementa
tion of
other
needed
policies to
promote EE
lighting in
various
areas,
including
codes,
standards,
and pro-
curement
rules
Existence of
regulations
that mandate
improved
energy
efficiency of
lighting
products and
installations,
including
codes,
standards,
and pro-
curement
rules
Conventional
incandescent
lighting is
available
without
restrictions
and consti-
tutes 85
percent of
residential
lighting in
Armenia
Conventional
incandescent
lighting is
available
without
restrictions
and consti-
tutes 85
percent of
residential
lighting in
Armenia
There is no
regulation on
energy
performance
of lighting
products in
Armenia
A national
phase-out of
conventional
incandescent
lighting is
adopted and
enters into
force
Lamps with at
least 25 percent
greater
luminous
efficacy replace
conventional
incandescents
according to
the timetables
of the adopted
phase-out
Other adopted
policies and
standards
support the
phase-out
Proposed
improvement to
existing
legislation
addressing
minimum energy
performance
requirements for
lighting appliances
A national phase-
out plan of conven-
tional incandescent
lighting is adopted
Other adopted
policies and
supporting
standards
New criteria
(including
performance and
life cycle costs) for
incorporation in
state procurement
procedures for
lighting
applications are
developed
Official
documentati
on of
adopted
legislation,
standards, or
other state
policy and
regulations.
Revised legal and
normative
documents
National program
on phase out of
incandescent
lighting
Technical
specifications for
ensuring MEPS for
public procurement
of lighting
equipment
Adoption of
national
policy
requires
sufficient
political will
and
addressing
of
stakeholder
concerns
about
lighting
quality, cost
to
consumers,
and mercury
containment.
no change
recommen-
ded at this
time
19 “Green Urban Lighting” UNDP-GEF/00074869 project
IV. Schedule for Reviews, Reports and Evaluations 1. Inception Report February 2014
2. Annual Project Review (APR) and Project
Implementation Report (PIR) (on annual basis)
The 1st APR is recommended, not mandatory,
by 1st
of July 2014
3. Mid Term External Evaluation December 2015
4. Final External Evaluation and Project Review August 2017
5. Terminal Report December 2017
In addition to the above mentioned, quarterly, mid-year annual progress, financial reports and work-
plans should be prepared as per UNDP-GEF and national executing agency/partner requirements.
Date report prepared: February, 2014
Diana Harutyunyan,
Climate Change Program Coordinator
UNDP Armenia
Artem Kharazyan,
Task Leader,
UNDP-GEF/00074869 Project
UNDP Armenia
20 “Green Urban Lighting” UNDP-GEF/00074869 project
V. List of Annexes
A. Agenda of the Inception Workshop
B. List of participants of the Inception Workshop
C. Presentations from Inception Workshop (available electronically)
D. Minutes of the Inception Workshop
E. Annual work plan for 2014
F. CO2 Emission Savings Calculation
21 “Green Urban Lighting” UNDP-GEF/00074869 project
ANNEX A
Agenda of the Inception Workshop
The RA Ministry of Nature Protection
Inception Workshop “Green Urban Lighting” UNDP-GEF/00074869 Full-sized Project
Picasso Hall of Best Western Congress Hotel, Yerevan
January 15, 2014
Agenda
9:30-10:00 Registration
10:00-10:20 Welcome address
Mr. Aram Harutyunyan, Minister of Nature Protection of the RA
Mr. Bradley Busetto, UN Resident Coordinator, UNDP Resident Representative
Municipality of Yerevan
10:20-10:35 Energy saving potential in urban lighting sector of Armenia: financial and
institutional means of its realization under UNDP-GEF project
Diana Harutyunyan
Climate Change Programme Coordinator, UNDP Armenia
10:35-10:50 Overview of UNDP-GEF mitigation projects in Eastern Europe and CIS
Ms. Marina Olshanskaya Regional Technical Advisor on Energy, Infrastructure, Technology and Transport, UNDP
Regional Centre for Europe and the CIS
10:50-11:10 Main components of the project, log frame, indicators and 2014 work plan
Artem Kharazyan
Project Task Leader
11:10-11:40 International best practice in improving energy efficiency and achieving energy
saving in urban lighting
Steven Coyne
International Consultant, “Light Naturally” Consulting Company
11:40-12:00 Q&A, Discussions
12:00-13:00 Lunch
13:00-14:00 Experience of UNDP-GEF lighting project implementation in Kazakhstan
Syrym Nurgaliev
Project Manager, UNDP-GEF Project “Promotion of Energy Efficient Lighting in
Kazakhstan”
Experience of UNDP-GEF lighting project implementation in Russia
Anatoly Shevchenko
Project Manager, UNDP-GEG Project ”Transforming the Market for Efficient Lighting in
22 “Green Urban Lighting” UNDP-GEF/00074869 project
Russia”
Transforming the market for efficient lighting in Ukraine: experience, lessons and
opportunities
Sergii Varga
Project Manager, UNDP-GEF Project “Transforming the Market for Efficient Lighting in
Ukraine”
14:00-14:15 Philips regional experience in implementation of municipal lighting projects
Natalia Yeremeeva
Philips Ukraine LLC, Director Outdoor Segment
14:15-14:30 Donor funded municipal lighting projects in the Armenian communities
Hrant Ter-Gabrielyan
Energy Efficiency Expert, Renewable Resources and Energy Efficiency Fund
14:30-15:00 Q&A, Discussions
15:00 Closing of the session
23 “Green Urban Lighting” UNDP-GEF/00074869 project
ANNEX B
List of Participants of the Inception Workshop
The RA Ministry of Nature Protection
Inception Workshop “Green Urban Lighting” UNDP-GEF/00074869 Full-sized Project
Picasso Hall of Best Western Congress Hotel, Yerevan
January 15, 2014
List of Participants
Name, Surname Organization Position
Ministries, State Authorities
1. Aram Harutyunyan Ministry of Nature Protection
of the RA
Minister
GEF National Focal Point
2. Simon Papyan Ministry of Nature Protection
of the RA
First Deputy Minister
3. Khachik Hakobyan Ministry of Nature Protection
of the RA
Deputy Minister
4. Volodya Danielyan Ministry of Nature Protection
of the RA
Chief Assistant to the Minister
5. Viktor Martirosyan Ministry of Nature Protection
of the RA
Director a.i., “Environmental project
implementation unit” State Agency
6. Gagik Saroyan Ministry of Nature Protection
of the RA
Head of Legal Department
7. Armen Vardanyan Ministry of Nature Protection
of the RA
Head of Information and Public Relation
Department
8. Hasmik Grigoryan Ministry of Nature Protection
of the RA
Head of Foreign Relations Department
9. Hermine Arakelyan Ministry of Nature Protection
of the RA
Chief Specialist of Public Relations Division,
Information and Public Relations Department
10. Nune Hovhannisyan Ministry of Nature Protection
of the RA
Head of International Program Management and
Monitoring Division, Monitoring of Environental Strategic Programs Department
11. Martiros Tsarukyan Ministry of Nature Protection
of the RA
Head of Atmospheric Air Policy Division
12. Artashes Bakhshyan Ministry of Territorial
Administration of the RA
Deputy Minister
13. Hrachya Tsughunyan Ministry of Energy and Natural
Resources of the RA
Development Department Head
14. Samvel Srapyan Ministry of Urban Development
of the RA
Head of Housing Stock and Municipal
Infrastructures Division, Housing Policy and Municipal Infrastructures Department
15. Aram Gabrielyan UNFCCC National Coordinator
24 “Green Urban Lighting” UNDP-GEF/00074869 project
Name, Surname Organization Position
16. Mesrop Gharibyan Public Services Regulatory
Commission of the RA
Chief Specialist of Investment Programs
Division
Municipalities and Adjacent Agencies
17. Kamo Areyan Yerevan Municipality First Deputy Mayor
18. Armen Harutyunyan Yerevan Municipality Head of Development and Investment Programs
Department
19. Nune Sahakyan Yerevan Municipality Head of International Investment and other
Institutions Projects Coordination Division
20. Meri Harutyunyan Yerevan Municipality Leading Specialist of International Investment
and other Institutions Projects Coordination Division
21. Arevhat Abrahamyan Yerevan Project CJSC Chief Specialist
22. Samvel Gabrielyan Yerevan Illumination CJSC Director
23. Vladislav Harutyunyan Yerevan Illumination CJSC Chief Engineer
24. Vardan Harutyunyan Gyumri Municipality Director, In-city Illumination Implementing
Company
25. Karen Igityan Gyumri Municipality Chief Engineer, In-city Illumination
Implementing Company
26. Georgi Yeremyan Aparan Municipality Deputy Mayor
27. Gagik Hayrapetyan Tsaghkadzor Municipality Deputy Mayor
28. Hrach Husikyan Hrazdan Municipality Chief Advisor to the Mayor
29. Artavazd Varosyan Alaverdi Municipality Mayor
30. Anahit Gyulazyan Spitak Municipality Deputy Mayor
31. Karen Hayrapetyan Spitak Municipality Deputy Head of Construction Department
32. Artashes Badalyan Sevan Municipality Head of Architecture and Construction Division
33. Samvel Galstyan Sevan Municipality Chief Specialist
34. Vladimir Ivanyan Abovyan Municipality Assistant to the Mayor
35. Gagik Hovhannisyan Abovyan Municipality Head on Municipal Economy Section
36. Vardan Gevorgyan Kajaran Municipality Mayor
37. Vardan Muradkhanyan Yeghvard Municipality Secretary of the Staff
UNDP-GEF
38. Bradley Busetto UN RC, UNDP RR UN RC, UNDP RR
39. Marina Olshanskaya UNDP-GEF Regional Technical Advisor on Energy,
Infrastructure, Technology and Transport
40. Armen Martirosyan UNDP Armenia Environmental Governance Portfolio Analyst
41. Anatoly Shevchenko UNDP Russia Project Manager at EE Lighting Project
42. Sergey Volkov UNDP Ukraine Head of EE Program
43. Sergei Varga UNDP Ukraine Project Manager at EE Lighting Project
44. Syrym Nurgaliev UNDP Kazakhstan Project Manager at EE Lighting Project
45. Hovhannes Sarajyan UNDP Armenia Communications Associate
25 “Green Urban Lighting” UNDP-GEF/00074869 project
Name, Surname Organization Position
46. Hovhannes Ghazaryan UNDP Armenia GEF Small Grants Program Coordinator
47. Babken Babayan UNDP Armenia Community Development Project Coordinator
48. Andrey Harutyunyan UNDP Armenia Community Development Project
Infrastructure/Public Work Specialist
49. Steven Coyne Light Naturally International Expert on Energy Efficient Lighting
for Inception Phase
International Organizations and Private Sector
50. Arthur
Cherednichenko
Philips Ukraine LLC Regional Senior Sales Manager, Caucasus and
Central Asia countries
51. Natalya Eremeeva Philips Ukraine LLC Director Outdoor Segment Manager
52. Bella Andriasyan KfW Armenia Energy and financial programs senior coordinator
53. Gohar Mousaelyan ADB Senior Project Officer
54. Anna Hambaryan EBRD Analyst, Yerevan Office
55. Carel Hofsta Counterpart International
Armenia
Chief of Party
56. Hayastan Stepanyan Counterpart International
Armenia
Community Development Sr. Manager and Local
Government Advisor
57. Harutyun Vardanyan Counterpart International
Armenia
CPI Civil Engineer
58. Marina Vardanyan USAID Team Leader for Energy, Water and
Environmental Portfolio
59. Nora Martirosyan Sustainable Urban
Development Investment Program
Project Director
60. Hrant Ter-Gabrielyan Armenia R2E2 Fund Expert
61. Sergey Abrahamyan Armenia R2E2 Fund Energy Saving Project Coordinator
Educational and Scientific Research Institutions
62. Eduard Kurghinyan State Engineering University of
Armenia
Docent, Chair of Electrical Machines and
Apparatus
63. Pepo Khachatryan State Engineering University of
Armenia
Chair of Electrical Machines and Apparatuses
64. Eduard Martikyan State Engineering University of
Armenia
Chair of Electrical Machines and Apparatuses
65. Ara Zakaryan Yerevan State University of
Architecture and Construction
Head of Information Technologies Coordination
Division
66. Anna Orbelyan Yerevan State University of Architecture and Construction
Head of Laboratory
67. Levon Aghekyan Scientific Research Institute of
Energy
General Director
68. Tigran Gnuni Scientific Research Institute of
Energy
First Deputy Director
69. Vahan Sargsyan Scientific Research Institute of
Energy
Director of Energy Strategy Center
26 “Green Urban Lighting” UNDP-GEF/00074869 project
Name, Surname Organization Position
70. Gevorg Nazaryan National Institute of Standards
CJSC
Deputy Director
71. Artak Hambaryan American University of Armenia Professor
72. Nelli Igityan Student
Private Sector and Design Institutions
73. Anzhela Davtyan CONSEL, Representation of
Philips Lighting in Armenia
Head of Commerce Division
74. Davit Danielyan CONSEL, Representation of
Philips Lighting in Armenia
Chief Specialist on Design and Sales of Lighting
Systems
75. Hrant Manukyan Kam.Arsi LLC, Representation
of OSRAM Lighting in Armenia
Deputy Director
76. Stepan Shahbazyan ELJEN LLC Director, Co-owner
77. Ashot Harutyunyan ELJEN LLC Executive Director
78. Vanik Baghdasaryan Sky Hawk LLC Director
79. Levon Margaryan Energy Net Project Institute
CJSC
Director
80. Mari Sofyan Hazarashen Co. Ltd. Electric Engineer
Climate Change Program, UNDP Armenia
81. Diana Harutyunyan Climate Change Program Coordinator
82. Artem Kharazyan Task leader, “Green Urban Lighting” UNDP-GEF project
83. Vahram Jalalyan Task leader, “Improving Energy Efficiency in Buildings”
UNDP-GEF project
84. Mikhail Vermishev National expert on GHG Mitigation Policy and Measures
85. Marina Sargsyan National expert on Energy Sector Economics
86. Gurgen Khostikyan National Expert, Energy Efficient Lighting
87. Armen Gulkanyan National Expert on Lighting Sector Market
88. Arsen Karapetyan National expert on Building Codes and Standards
89. Tigran Sekoyan National expert on assessment of energy saving in buildings,
quality assurance/quality control of construction and insulation
materials
90. Apres Nazaryan National expert on Architecture and Design
91. Artur Tsughunyan National expert on energy auditing and evaluation of the energy
efficiency potential
92. Anna Dira National Expert on Public Outreach
93. Tatevik Vahradyan Climate Change Program Expert Team Assistant
94. Marianna Arzangulyan Climate Change Program Expert Team Assistant
27 “Green Urban Lighting” UNDP-GEF/00074869 project
ANNEX C
Presentations from the Inception Workshop
Presentations from the IW are available electronically at the web-site of Armenia Climate Change
Information Center, http://www.nature-ic.am/green-urban-lighting/ .
28 “Green Urban Lighting” UNDP-GEF/00074869 project
ANNEX D
Minutes of the Inception Workshop
“Urban Green Lighting” UNDP-GEF/00074869 project
I N C E P T I O N W O R K S H O P
“Picasso” hall of “Congress” hotel
January 15, 2014, 10am
PARTICIPANTS: The workshop was attended by 94 participants (see the list attached).
PURPOSE: The purpose of the IW was to launch the project’s implementation with participation
of the stakeholder parties as required by the GEF procedures, to present the project’s
management arrangements, discuss the project’s implementation approaches, and
identify the key areas of cooperation.
The workshop proceeded mainly in accordance with the agenda.
I. Presentations
Welcoming remarks were delivered by Mr.A.Harutyunyan, Minister of Nature Protection of the RA,
Mr.B.Busetto, UN RC, UNDP RR, Mr.K.Areyan, First Deputy Mayor of Yerevan city, Mr.S.Papyan, First
Deputy Minister of Nature Protection. The speakers attached high importance to the project, especially legal
reform in the field of energy efficiency and support to introduction of “green” technologies, highly
appreciated the joint efforts and expressed their willingness for the continuous cooperation.
Then Ms.D.Harutyunyan welcomed participation of UNDP representatives from Russia, Ukraine and
Kazakhstan and noted the favorable opportunity to yield of their implemented projects’ experience. She
presented energy saving potential in the urban lighting sector of Armenia, especially financial and
institutional frames of UNDP-GEF project implementation.
Ms.M.Olshanskaya presented UNDP experience in the field of energy efficiency in Eastern Europe and
Central Asia, stressing multifold impact of improvements ion energy efficiency, including on human health,
as well as importance of cooperation with authorities on local, regional and national levels.
Mr.A.Kharazyan addressed the key components of the project and its log-frame and presented activities
envisaged for 2014 and briefly described the tactics of the pilot projects.
Mr.S.Coyne presented the best international practice in improving energy efficiency and ensuring energy
saving in urban lighting, in particular, emphasized the issue of harmonization of the local regulating
frameworks with international ones, recommended to use Minimum Energy Performance Standards as a
guidance considered a reliable basis for the sector’s development, referred to phase-out process of inefficient
technologies in Australia, stressing the importance of supporting policies and programs. With a separate
presentation, he referred to the energy efficient street lighting trial in South-Eastern Queensland in 2008 to
2012, describing its structure and results, and formulated options for transition to energy efficient lighting
solutions.
Mr.S.Nurgaliev addressed the experience of a similar UNDP-GEF project under implementation in
Kazakhstan, with special attention to the legal basis of safe and energy efficient lighting, and the current and
completed pilots, particularly, aiming at proper recycling of mercury containing lamps. He also presented
promotional materials produced within the project, including brochures and leaflets.
29 “Green Urban Lighting” UNDP-GEF/00074869 project
Mr.A.Shevchenko presented Russian experience implementing the UNDP-GEF project in urban lighting, in
particular, assessment of energy saving potential, main issues in market development of lighting technology
based produce, opportunities for expansion of energy services and complex modernization of street lighting.
He also referred to the publications produced within the project.
Mr.S.Varga addressed mid-term experience, lessons learned and opportunities of the UNDP-GEF project
under implementation in Ukraine, stressing the importance of national policies, quality control, recycling of
mercury containing waste, public awareness raising, and impact of pilots (in urban lighting management
systems, for entrances of residential buildings, streets, parks, signal lighting etc.) for transforming the market
for efficient lighting.
Ms.N.Yeremeeva presented Philips’s regional experience in implementation of municipal lighting projects,
especially the company’s potential for reaching higher comfort levels in urban settlements via improving
lighting systems/services. She detailed on urban lighting management systems, including their introduction,
invited the participants’ attention to LED options and presented the company’s projects implemented in
China, Belarus, Niderlands, Spain, Poland, Great Britain, and Argentina.
Mr.H.Ter-Gabrielyan addressed the experience of Armenia Renewable Resources and Energy Efficiency
Fund, emphasizing that the works are implemented in kindergartens, secondary and higher education
institutions (e.g., Armenian National Agrarian University Foundation), administrative buildings, street
lighting sector in Dilijan and Vayk towns. A necessary condition of pilots’ implementation is presence of
some lighting operational in an urban area – to ensure payback. He noted that LED options were rejected
both due to their high costs and because of the outdated, but still effective requirement of the RA
Construction Norms II-8.03-96 – mandatory use of high pressure sodium lamps for street lighting.
II. Questions and recommendations
The participants greeted inception of the project implementation and expressed their willingness to support
the project activities.
The participants discussed possible mechanisms of produce standardization, and noted that High Efficiency
Performance Standards are necessarily applied voluntarily as a means of promoting a produce (so the
assessment process is initiated by the producer to finally achieve the respective labelling of the products),
while Minimum Energy Performance Standards could be applied mandatorily. (A.Gabrielyan, S.Coyne,
D.Harutyunyan)
The participants highly appreciated the manual on energy efficient electrical lighting for higher education
institutions presented by the colleagues from Russia (“Energy Efficient Electrical Lighting”, 2013,
http://issuu.com/undprussia/docs/ee_lighting_textbook). Acknowledging weak possibility of major
amendments to the manual’s contents, it may be reprinted in Armenia with. (A.Shevchenko, D.Harutyunyan,
A.Kharazyan)
Mr.V.Baghdasaryan, Director of “Sky Hawk” Co Ltd., inquired of availability of scientific studies on LED
options’ impact on human health. On that, Mr.S.Nurgaliev informed that the project he presented used
guidance of Scientific Research Institute of Hygiene and Health Care of Children and Adolescents of
Russian Academy of Medical Sciences (www.niigd.ru). Particularly, their activities were underpinned by the
three-year long study by the Institute that revealed no harm of LED for human health if all the technical
requirements were met. Mr.A.Shevchenko briefly presented application of reflectors and diffusers, use of
data on color heat and specter, referring to scientific studies on eye physiology currently performed in
Russia.
Mr.M.Vermishev proposed the following issue for the participants’ discussion: (1) harmonization of
regulations and standards in the frames of European Neighbourhood Policy and Customs Union of Eurasian
Economic Community, (2) options for realization of presumably high energy efficiency potential in
residential buildings’ lighting systems, (3) quality certification of imported produce using services of testing
laboratories.
30 “Green Urban Lighting” UNDP-GEF/00074869 project
Mr.S.Nurgaliev informed on point (1) that several standards are in the adoption process in Kazakhstan, in
particular, one on ecodesign enters into force in 2016, continuous comparisons are performed between
European and Eurasian normative and regulatory bases to avoid duplications and discrepancies; and clarified
on point (3) that Kazakhstan does not use a focused control over LED quality, however, a standard
framework procedure of checking compliance certification documentation operates on the country’s borders.
Mr.A.Cherednichenko noted on point (2) that administrative pressure in residential sector may yield adverse
results, especially given the wide presence of counterfeit produce in the market, and briefly presented the
“soft impact” experience of Phillips in Ukraine: due to informational and awareness raising measures, in
particular, info-graphics and explanatory activities in sales points, the company sold about 50 million energy
efficient lamps and fixtures.
Commenting on the project presentation, Mr.V.Gevorgyan, Mayor of Kajaran, stressed the importance of the
works to be performed in communities throughout Armenia, as vital solutions usually come from
communities. He noted that long-term experience with UNDP and GEF allows expecting positive results of
this newly launched project, too, for the RA communities. He referred to the cooperation between the private
sector and the project, in particular, in terms of involving the copper-molybdenum plant of Kajaran into
pilots to implement in health care and educational facilities of the town and vicinity. Saved funds could be
then used for other improvement projects.
Dr.A.Hambaryan, professor of American University of Armenia, inquired of Phillips representatives on
measurability and comparability of energy efficiency of lighting and on assessment of the respective trend
(e.g., monetary value of one lumen decreased). Mr.A.Cherednichenko had no data on one lumen value as the
company was selling solutions as a complex, in particular, examining the set of used devices and developing
a range of possible solutions each stressing a fixture, a management system etc. Ms.D.Harutyunyan
suggested not dwelling on a particular company’s prices. Mr.A.Cherednichenko noted that educated
application is particularly important in the case of the company’s actively promoted “white lights” (LED).
Mr.A.Gabrielyan recalled that during the project’s preparatory phase financial mechanisms of project imple-
mentation were envisaged that were not included into the approved Project Document and that should be
innovative, especially in terms of addressing adaptation and mitigation issues. Moreover, lately, the RA
Government approved an activity plan towards this goal (protocol decisions #16-8 and #47-6 of the RA
Government sessions of April 25, 2013 and of November 14, 2013 respectively; available in Armenian
language at www.e-gov.am/gov-decrees/). Besides, Green Climate Fund is established in the frames of
UNFCCC that provides incremental funding. The project could create an environment for implementing
pilots that would reveal feasibility and prospective of revolving funds collected of the environmental fees as
community subventions.
Mr.A.Kharazyan noted that the financial mechanisms reviewed at the project’s preparatory phase were both
more precise and more diverse: (1) establishment or involving of an energy services providing company to
contract municipalities and perform the envisaged measures with its own or lent financing, (2) operation of
lighting system’s section by a company under a concessional contract with obligation to modernize the
section and return it to municipality afterwards, (3) establishment and operation of a soft loan mechanism
and/or a revolving fund. However, based on consistent studies and consultations with an international expert,
the present legal and regulatory framework was considered not sufficient for successful completion of such
an exercise. Nevertheless, the project intends to use certain financial mechanisms, in particular, option (3)
was discussed with Yerevan city Municipality and preliminary consent was reached with them on
implementing energy efficiency improvement measures in lighting with the saved amounts returned to the
fund and used for new projects. That was for Yerevan city only. Besides, the project shall support the applied
municipalities to prepare a request to international funding organizations/facilities (WB, IFC, EBRD etc.). In
addition, the project shall support developing an energy efficient lighting program in Yerevan city; the
program shall come as a feasibility study written in banking/financial language and shall be submitted to
donors for funding. In general, the present/approved formulations are more realistic and more in line with the
current context.
31 “Green Urban Lighting” UNDP-GEF/00074869 project
Mr.A.Varosyan, Mayor of Alaverdi, wished to the project to come into action as soon as possible and inform
communities on participation requirements including financial terms. He hoped that works aiming at energy
efficiency improvement would involve large producers in community programs, e.g. within their corporate
social responsibility. He saw kernel of sense in establishing a fund collected of the environmental fees as
community subventions, which was repeatedly discussed at Alaverdi municipality and vicinal communities.
As for environmental funds to be established to replace the current mechanism of environmental
subventions, it would be far more effective to finance not only communities within their respective territory,
but also the respective ecosystem – with border communities to be involved into cross-border cooperation.
Municipality of Alaverdi is committed to allot funds towards that purpose.
Mr.A.Kharazyan expressed his appreciation to Mr.A.Varosyan and noted that the project currently develops
pilot project selection criteria to be presented to the partner towns, including Alaverdi town Municipality.
According to the GEF procedures, co-financing commitment is a key requirement with the project ensuring
energy efficiency component of the town’s development activities, in particular, providing fixtures, lamps,
and other relevant equipment. As the project aims at cooperation with communities, no energy efficiency
improvement measures are intended for industrial actors. However, involvement of large producers as
possible donors is definitely advisable. In administrative terms, he added that the project’s Inception Report
shall be provided to the participants electronically within two weeks.
III. Decision:
The workshop participants shall be provided with the inception report (by posting that on the project’s page
of www.nature-ic.am web-site) that would, in particular, reflect amendments to the project document based
on the participants’ expressed views and made recommendations.
32 “Green Urban Lighting” UNDP-GEF/00074869 project
ANNEX E
Annual Work Plan for 2014
ANNUAL WORKPLAN 2014
“Green Urban Lighting” UNDP-GEF project
Award ID: 00074869, Project ID: 00087057
Outcomes/Outputs/Activities 2014
Output 1 2 3 4 5 6 7 8 9 10 11 12
1: Knowledge and capacities for urban green lighting
1.1: Audits of public lighting systems
Activities:
Organize the design and execution of technical audits of public
lighting systems to define baseline technical information and
energy saving potential for municipal plans and financial proposals
for specific sets of upgrades to be carried out.
X X X X X X X X X
Completed energy audit of at least 1 public
(municipal) lighting system. Target municipality is
informed on the results of the audit. Results provide
baseline information of Component 2
(Demonstration Projects).
Development of a methodological guidance (manual) for energy
audit of municipal lighting systems based on the best international
practice and with consideration of local specificities. X X X X
A municipal lighting energy audit methodology
manual developed, discussed with stakeholders and
provided to municipalities as recommended
guidance.
1.2: Study tour to GEF Public Lighting project in Central Europe
Activities:
Organize a study tour to CEE on best practices in urban lighting
design, organization and financing for key personnel of involved
municipalities and other responsible agencies.
Completed study tour to GEF Public Lighting
project in CE Europe (100% co-financed).
1.3: Technical training and capacity building for the respective specialists
Activities:
Development of training and capacity building materials on EE
lighting including information on practical application of the
municipal lighting energy audit methodology manual developed
under subcomponent 1.1and available material from pilot projects
interim results.
X X X X Training and capacity building materials are
developed.
Organize and deliver at least two half-day capacity-building
seminars on energy efficient lighting for technical specialists from
municipal agencies, lighting companies, and building design
institutes.
Technical training and capacity building on EE
lighting for appropriate technical specialists
delivered.
33 “Green Urban Lighting” UNDP-GEF/00074869 project
Outcomes/Outputs/Activities 2014
Output 1 2 3 4 5 6 7 8 9 10 11 12
1.4: Increased awareness and support among the general public for green urban lighting programs.
Activities:
Organize media coverage and other public outreach on energy-
efficient lighting, to build support for the urban programs and also
to promote EE lighting in the residential sector.
X X X X X X X X X X X Media coverage and public outreach on energy
efficiency lighting is organized.
2: Pilot urban green lighting projects
2.1: Design, completion, and documentation of demonstration projects on street lighting
Activities:
Identification of pilot streets, collection of baseline information,
development of design for pilot demonstration projects. X X X X
At least one pilot street in Yerevan is identified and
pilot project is designed and agreed with relevant
stakeholders.
Implementation of pilot energy efficient street lighting projects in
municipalities of Armenia. X X X X X X X
At least one demonstration project on application of
EE technologies completed for street lighting in
Yerevan.
Monitoring and documentation of the achieved results. X X X X
Implemented pilot(s) is(are) monitored and the
achieved results are documented.
Dissemination of the results achieved through pilots to the relevant
stakeholders.
Results are analyzed and disseminated among
stakeholders and incorporated into updated training
materials.
2.2: Design, completion, and documentation of demonstration project in municipal public buildings
Activities:
Identification of public buildings, collection of baseline
information, development of design and implementation of pilot
demonstration projects.
Pilot public buildings are identified and pilot
projects activities are initiated.
Monitoring, documentation and dissemination of the achieved
results to the relevant stakeholders.
Implemented pilots are monitored and the achieved
results are documented and disseminated and
incorporated into updated training materials.
2.3: Design, completion, and documentation of demonstration project on lighting of outdoor spaces
Activities:
Identification of pilot outdoor spaces, collection of baseline
information, development of design and implementation of pilot
demonstration projects.
X X X X At least one pilot outdoor lighting space is identified
and pilot project activities are initiated.
34 “Green Urban Lighting” UNDP-GEF/00074869 project
Outcomes/Outputs/Activities 2014
Output 1 2 3 4 5 6 7 8 9 10 11 12
Monitoring, documentation and dissemination of the achieved
results to the relevant stakeholders. X X X
Implemented pilot(s) is(are) monitored and the
achieved results are documented and disseminated
and incorporated into updated training materials.
3: Financial and institutional mechanisms for scaling up municipal EE lighting programs
3.1: Support for private, international, and innovative municipal financing for EE urban lighting programs.
Activities:
Design of a financial mechanism (e.g. a municipal revolving fund)
for recovery and reinvestment of funds saved from the energy
efficiency lighting upgrades in Yerevan.
X X X X X Potential options for establishment of a financial
mechanism are identified and documented.
Assistance to the Municipality of Yerevan and other interested
municipalities in development and delivery of applications to
financial institutes and facilities for credit for energy efficient
lighting investments.
X X X X
Potential financial institutes and facilities for
financing implementation of EE lighting activities in
municipalities are identified and documented.
Organization of a tender for at least one ESCO to provide and
install energy-efficiency upgrades for part or all of the municipal
lighting program in at least one city outside Yerevan, and if
applicable, also for Yerevan itself.
A tender for one ESCO for provision and
installation of EE upgrades in at least one city
outside Yerevan is organized.
3.2: Development and approval of the city-wide program on public lighting in Yerevan
Activities:
Assistance to the Municipality of Yerevan in development and
adoption of a program for upgrades of public lighting system.
A city-wide program for upgrades of public lighting
in Yerevan developed and proved.
3.3: Facilitation of analogous programs in other cities in Armenia
Activities:
Support to the interested municipalities in Armenia in development
and implementation of public lighting upgrades programs
analogous to the Yerevan program.
Analogous public lighting upgrades programs are
facilitated.
4: National policies, codes, and standards on EE lighting
4.1: Phase-out of incandescent lighting and/or other major national policies on EE lighting
Activities:
Development of a comprehensive review of the present best
international practice with regard to phase-out of inefficient
incandescent lighting, including overview of the experience in
neighboring countries.
X X X X A review on best international practice in
incandescent lighting phase-out is developed.
Development of technical and policy justification for a phase-out of
inefficient incandescent lamps in Armenia. X X X
Justification of incandescent lighting phase-out in
Armenia is developed and submitted to the relevant
stakeholders for consideration.
35 “Green Urban Lighting” UNDP-GEF/00074869 project
Outcomes/Outputs/Activities 2014
Output 1 2 3 4 5 6 7 8 9 10 11 12
Support to the Government of RA in drafting and adoption of the
proposed legislation and enforcement mechanism of phase-out of
conventional incandescent lighting.
A national policy on incandescent lighting phase-out
is adopted.
4.2: Development and adoption of new standards for lighting quality, lighting design in buildings and construction, and lighting issues in public health
Activities:
Support the development of relevant legislation, standards and
requirements on quality and performance of lighting equipment also
covering testing procedures and public health aspects.
X X X X
New legislation, standards and regulation on EE
lighting (including street lighting fixtures) are
drafted.
Development of recommendations for environmentally safe
collection and disposal of used mercury-containing lighting
equipment.
Existing international best practice on
environmentally safe collection and disposal of used
mercury-containing lighting equipment is studied
and a strategy for RA proposed.
4.3: Development and adoption of new rules for state agencies on procurement of energy-efficient lighting
Activities:
Elaboration and provision of recommended processes and criteria
for selection of EE products to be incorporated in state procurement
procedures for lighting applications.
X X
New EE and quality criteria for incorporation in
state procurement procedures for lighting
applications are drafted.
5: Project Management
5.1. Project Board composition and the first meeting X X
5.2. The Technical Advisory Committee set-up and the first meeting X
5.3. Establishment of Project Team X X
5.4. Development of Inception Report X X
5.4. Development of quarterly and annual progress reports X X X X
5.5. Conduct regular field visits X X X X
5.6. Monitoring and evaluation X X X X
5.7. Mid-term and final evaluation
36 “Green Urban Lighting” UNDP-GEF/00074869 project
ANNEX F
Project Risk Log
Project Title: “Green Urban Lighting” Award ID: 00074869 Date: Apr-14
Description Date
Identified
Type Impact & Countermeasures / Mngt response Owner Submitted,
updated by
Last
Update
Status
Probability
(In Atlas, use
the Description
field. Note: This
field cannot be
modified after
first data entry)
(In Atlas,
select date.
Note: date
cannot be
modified
after initial
entry)
(In Atlas,
select from
list)
(in Atlas, use the
Management
Response box. Check
“critical” if the
impact and
probability are
high)
(in Atlas, use the Management
Response box. This field can be
modified at any time. Create separate
boxes as necessary using “+”, for
instance to record updates at
different times)
(In Atlas,
automatically
recorded)
Financing for
demonstration
projects and/or
municipal
programs proves
to be
unavailable
13.04.2013 financial Fail to demonstrate
financial and energy
saving benefits from
introduction of
energy efficient
technology in
municipal lighting
sector.
P = 2
I = 4
Starting during or immediately after
demonstration projects are confirmed
during the Inception Period, the
project will negotiate memoranda of
understanding with responsible
agencies and partners. Then, during
the project design stage, specific
sums for co-financing responsibility
will be agreed upon and confirmed by
contract. Municipality of Yerevan
and UNDP have both confirmed their
commitment to support
demonstration projects. In addition,
UNDP and the R2E2 Fund have
agreed to try to provide mutual
support where possible, which could
prove very helpful in the orderly and
timely securing of financing.
Yerevan
Municipality
Other target
cities'
municipalities
Stakeholders,
e.g. USAID,
WB, UNDP
RBEC
EG Portfolio
Analyst
Project Task
Leader
13.05.2014 pending
37 “Green Urban Lighting” UNDP-GEF/00074869 project
Proposed policy
changes are not
adopted or not
sufficiently
enforced
13.04.2013 political /
regulatory
Energy efficiency is
not legally
mandatory enforced:
low incentives for
energy performance
improvement; low
replicability of
energy efficiency
lighting
demonstration
projects.
P = 3
I = 3
All proposed policy changes are
aligned with stated national priorities
and objectives in the areas of climate
change mitigation and energy
efficiency. With specific regard to the
phase-out of incandescents, the
project is already anticipating
proposing a more moderate
alternative approach if stakeholder
opposition to an aggressive phase-out
is prohibitively strong.
RA
Government
RA National
Assembly
EG Portfolio
Analyst
Project Task
Leader
13.05.2014 pending
Involvement of the Ministry of
Energy and Natural Resources and
the Municipality of Yerevan as key
national implementing partners will
secure required political
backstopping to the proposed policy
changes at the national and municipal
level. UNDP has a successful track
record in Armenia with promoting
policy reforms, such as in district
heating sector, and will build on its
past experience and lessons learnt.
Inadequate
project
implementation
and
coordination
with other
initiatives
13.04.2013 strategic Ineffective efforts in
the fields due to lack
of cooperation,
overlap of functions.
P = 2
I = 2
In particular, for design and
implementation of demonstration
projects, implementation time-frame
and coordination with other partners
and providers of co-financing is
critical. UNDP Armenia has
experience with implementing
similarly complex projects for
construction of pilot EE buildings;
the same model and institutional
arrangement for procurement will be
adopted for green lighting projects.
Project Team,
Stakeholders
EG Portfolio
Analyst
Project Task
Leader
13.05.2014 pending
39 “Green Urban Lighting” UNDP-GEF/00074869 project
A series of consultation were held with the Municipality of Yerevan during the inceptions phase of
the project aimed at clarification of plans regarding organization of pilot demonstration projects.
During the meetings a number of proposals were made by the Municipality regarding selection of
pilot streets and proposed pilot lighting technologies. As the result of consultations the scope of the
proposed demonstration projects as well as estimation of energy saving and GHG emission reduction
potential have revised as shown below.
Estimation of direct emission reduction from implementation of the proposed pilot projects
Pilot 1A: Replacement of 250W HPS lamps with 150W HPS lamps
The majority of basic parameters, technical solutions and assumption for this pilot remain the same;
however, the total number of lamps to be replaced has been reduced from 2323 to 1300. This led to
the following changes in GHG emission saving assessment.
Parameters Unit ProDoc Scenario Revised Scenario
Type of lights (fixtures) type ZHKU-250 (old) to Osram/Philips/GE
Type of bulbs type DNAT 250 to HPS bulbs
Capacity of bulbs W 250 to 150
Number of lights to be replaced psc. 2323 1300
Annual energy consumption saving MWh/y 847 522
Annual GHG emission reduction tCO2/y 339 208.8
Total energy consumption reduction during 15
year technology lifetime MWh 12705 7830
Total GHG emission reduction during 15 year
technology lifetime tCO2 5082 3132
Initial GEF cost of the pilot implementation USD 400000 237900
Pilot 1B: Replacement of 400W mercury-vapor lamps and fixtures with 150W HPS
The majority of basic parameters, technical solutions and assumption for this pilot remain the same;
however, the total number of lamps to be replaced has been reduced from 581 to 200. This led to the
following changes in GHG emission saving assessment.
Parameters Unit ProDoc Scenario Revised Scenario
Type of lights (fixtures) type RKU-003-400 to Osram/Philips/GE
Type of bulbs type Mercury-vapor to HPS bulbs
Capacity of bulbs W 400 to 150
Number of lights to be replaced psc. 581 200
Annual energy consumption saving MWh/y 371 140.5
Annual GHG emission reduction tCO2/y 148.4 56.2
Total energy consumption reduction during 15
year technology lifetime MWh 5565 2108
Total GHG emission reduction during 15 year
technology lifetime tCO2 2226 843
Initial GEF cost of the pilot implementation USD 100000 36600
Pilot 1C: Replacement of 250W HPS with LED street lights
The majority of basic parameters, technical solutions and assumption for this pilot remain the same;
however, installed capacity of new LED based lamps has been increase from 110W to 150W, the total
40 “Green Urban Lighting” UNDP-GEF/00074869 project
number of lamps to be replaced has been increased from 162 to 884 as well as technology lifetime
was reduced from 20 to 15 years . This led to the following changes in GHG emission saving
assessment.
Parameters Unit ProDoc Scenario Revised Scenario
Type of lights (fixtures) type ZHKU-250 (old) to Osram/Philips/GE
Type of bulbs type DNAT 250 to LED
Capacity of bulbs W 250 to 110 250 to 150
Number of lights to be replaced psc. 162 884
Technology lifetime year 20 15
Annual energy consumption saving MWh/y 83 403.3
Annual GHG emission reduction tCO2/y 33 161.3
Total energy consumption reduction during
technology lifetime MWh 1657 6050
Total GHG emission reduction during
technology lifetime tCO2 663 2420
Initial GEF cost of the pilot implementation USD 150000 406640
Pilot 2: 150W HPS instead of 250W HPS on a new street
This pilot project has been omitted.
Pilot 3: EE lighting in buildings
The majority of basic parameters, technical solutions and assumption for this pilot remain the same;
however, installed capacity of new LED based lamps has been slightly revised which led to the
following changes in GHG emission saving assessment.
Parameters Unit ProDoc Scenario Revised Scenario
Type of lights (fixtures) type IL and FL to LED and LED Tube Shape
Capacity of bulbs W 60 to 12; 40 to 20;
20 to 10
60 to 10; 10 to 21;
10 to 9
Number of lights to be replaced psc. 1378 1378
Annual energy consumption saving MWh/y 88 91
Annual GHG emission reduction tCO2/y 35.2 36.4
Total energy consumption reduction during 15
year technology lifetime MWh 1320 1365
Total GHG emission reduction during 15 year
technology lifetime tCO2 528 546
Initial GEF cost of the pilot implementation USD 25000 44500
Pilot 4: LED illumination of outdoor spaces
For this pilot project only the installed capacity of newly installed LED based lamps has been
increased from 60W to 90W which led to the following changes in GHG emission saving assessment.
Parameters Unit ProDoc Scenario Revised Scenario
Type of lights (fixtures) type ZHKU-150 (old) to Osram/Philips/GE
Type of bulbs type DNAT 150 to LED
Capacity of bulbs W 150 to 60 150 to 90
Number of lights to be replaced psc. 108 108
Annual energy consumption saving MWh/y 35 29.6
41 “Green Urban Lighting” UNDP-GEF/00074869 project
Annual GHG emission reduction tCO2/y 14.2 11.8
Total energy consumption reduction during 15
year technology lifetime MWh 532 444
Total GHG emission reduction during 15 year
technology lifetime tCO2 213 177
Initial GEF cost of the pilot implementation USD 50000 24400
In the table below summary of total direct energy saving and avoided emission from implementation
of the proposed pilot project is given for both initial and revised scenarios.
Summary of direct energy saving and avoided emissions from the initial and revised pilot projects
Parameters Unit ProDoc Scenario Revised Scenario
Total energy consumption reduction during 15
year technology lifetime MWh 25064 17796
Total GHG emission reduction during 15 year
technology lifetime tCO2 10026 7118
Initial GEF cost of the pilot implementation USD 850000 750000
Estimation of direct emission reduction replication of the proposed pilot projects
Along with revision of direct energy saving and GHG emission reduction from pilot projects also
energy saving and emission reduction potential from replication of pilot project have been revised in
order to consider reinvestment of funds saved from implementation of the proposed pilots.
Replication of the proposed energy efficiency measures in the lighting sector are conditionally divided
into two groups:
1. Replication activities financed from savings achieved by the municipalities due to
implementation of project pilots under Green Urban Lighting project;
2. Replication financed from direct funding provided by the municipalities from community
budgets or other sources.
The results of calculations of direct annual energy saving and GHG emission reduction from
replication of the pilots achieved by the end of the project implementation year (2017) due to
reinvestments of saved funds (e.g. via Energy Efficient Lighting Revolving Fund) are introduced
below.
Energy saving and emission reduction achieved via replication of the proposed EE measures
financed by municipalities from savings achieved via pilot projects
2015 2016 2017
Reinvestment, USD 79,891 88,401 97,817
Annual electricity consumption reduction, MWh/y 126.4 266.2 420.9
Annual GHG emissions reduction, tCO2/y 50.5 106.5 168.4
In such a way, by the end of project implementation annual GHG emission reduction from the
replication of proposed energy efficiency measures due to reinvestment of saved funds will achieve
about 170 tCO2/y.
If the proposed municipal energy efficient lighting reinvestment mechanism continues to operate after
completion of the project then by 2029 the annual energy saving in municipal lighting sector will
amount about 4230 MWh/y and associated annual GHG emission reduction will be about 1690 t
CO2/y.
It should be noted that all estimations are made for a fixed emission factor.
42 “Green Urban Lighting” UNDP-GEF/00074869 project
The rest of the projections and estimations of direct (replication of the proposed pilot measures via
municipal and other programs) and indirect (national cross-sectorial policy, including IL phase out)
energy saving and emission reduction potential made in the ProDoc remain unchanged.
The table below summarizes the projected global environmental benefits from the project
Emissions reduction type
and relevant output
Amount
(tonnes of CO2)
Time frame over which reductions are to
be achieved
Direct (revised)
Demonstration projects 7,118
Measures installed during project period;
savings achieved over various measure
lifetimes
Indirect bottom-up
Replication of pilot projects
via municipal programs
135,000
Programs adopted and launched during
project period; savings achieved over various
measure lifetimes
Indirect top-down
National cross-sectoral
policy, including IL phase-
out
500,000
(moderate phase-out)
to 1,000,000
(aggressive phase-
out)
Policies to be developed and adopted during
project period. Reductions calculated for 10
years from project inception. Further savings
may reasonably be expected beyond 10
years, but are not shown here.
43 “Green Urban Lighting” UNDP-GEF/00074869 project
ANNEX H
Mission Report of the
International Expert on EE Lighting for Inception Phase
44 “Green Urban Lighting” UNDP-GEF/00074869 project
Mission Report
Republic of Armenia
“Green Urban Lighting”
(UNDP/GEF/00074869 Project)
Mission Report
Feb 2014
Suite 1B, 17 Peel St, South Brisbane T: +61 7 3844 0602
PO Box 3458, South Bank QLD 4101 AUSTRALIA F: +61 7 3844 8161
www.lightnaturally.com.au
45 “Green Urban Lighting” UNDP-GEF/00074869 project
Contents
1 INTRODUCTION 46
2 SITUATION ANALYSIS 46
3 PROPOSED STRATEGY 46
3.1 TECHNICAL CAPACITY BUILDING AND STAKEHOLDER ENGAGEMENT .......................................................... 9
3.2 DEMONSTRATION PROJECTS ....................................................................................................................... 47
3.2.1 Municipal Lighting Audits ................................................................................................................. 47
3.2.2 Technology (Lamp) Selection and Procurement Process .................................................................. 48
3.2.3 Pilot Site Selection Process ............................................................................................................... 51
3.2.4 Ratification of Lamps and Pilot Sites Selections ............................................................................... 51
3.2.5 Monitoring Protocols ........................................................................................................................ 51
3.2.6 Pilot Performance Analysis and Reporting ....................................................................................... 51
3.2.7 Financing the Asset Changeover ....................................................................................................... 52
3.3 REPLICATION OF MUNICIPAL LIGHTING PROGRAMS ................................................................................... 12
3.4 NATIONAL POLICIES, CODES, AND STANDARDS ON LIGHTING .................................................................... 13
3.4.1 National Stock Model ........................................................................................................................ 52
3.4.2 International Review of Standards and Codes .................................................................................. 53
4 SUMMARY OF RECOMMENDED ACTIONS 54
5 APPENDICES 55
5.1 APPENDIX A: IEA 4E SSL OUTDOOR LIGHTING PERFORMANCE TIERS ...................................................... 55
5.2 APPENDIX B: RESIDENTIAL SECTOR ELECTRICITY USE FOR LIGHTING ....................................................... 57
5.2.1 USA: .................................................................................................................................................. 57
5.2.2 European Union: ............................................................................................................................... 57
5.2.3 Lights Labours Lost (IEA Publication) ............................................................................................. 57
5.2.4 Australia: ........................................................................................................................................... 57
46 “Green Urban Lighting” UNDP-GEF/00074869 project
Introduction The objectives of the mission were to:
1. Develop and present, at the project’s inception workshop, a presentation on international best
practice and technologies in improving energy efficiency and achieving energy saving in urban
lighting sector. Special attention shall be drawn to cost effective energy efficient lighting
technologies for outdoor and indoor application that may ensure feasibility and replicability of
the proposed measures for the local urban communities.
2. Analyse existing project related documents as well as recommendations and opinions provided by
stakeholders during and after the Inception Workshop in order to prepare recommendations on
the full-sized project implementation strategy.
3. Provide recommendations on the project implementation strategy based on the outcomes of the
inception workshop, international practice and existing project documents
Situation Analysis The project will carry out several activities that will deliver specific outputs. The work will be organized in
four interrelated components:
municipal energy audits and technical capacity-building
demonstration projects
replication via municipal lighting programs and associated financial instruments
national policies, codes, and standards on lighting.
Documents provided for analysis included:
Overview of Baseline Information for GUL Project_08.01.2013.docx
Green Lighting Prodoc_ENG_signed.pdf
PIMS 4669 Armenia Green Lighting PIF 21 Dec 2011_eng_final.pdf
Report on Review of Market and Legislation_21 01 2013.docx
Calculation of IL phase-out effects Armenia Chao Feb 2013.xlsx
Armenia Lighting LogFrame.docx
Annual Work Plan for GUL for 2014 (ENG).docx
Proposed Strategy In order to maximise the success of this project in terms of sustainable energy savings with community
acceptance of the transformation outcomes, there is an opportunity now to strategically plan the integration
of the technical capacity building throughout the project’s other specified activities.
Technical Capacity Building and Stakeholder Engagement The critical spine to the entire project is technical capacity building and there is no better way to achieve this
with key representatives from stakeholders than by having them gain practical experience by participating in
the implementation of the project.
The two main areas where capacity building will be required are technical operations and financial
operations/modelling. Therefore, a Financial Working Group and a Technical Working Group should be
established, with each Working Group comprising of representatives from:
Green Urban Lighting Project team
Local independent experts (one technical expert for TWG and one finance expert for FWG)
International independent expert (as appropriate)
Yerevan Municipality representatives
o Mayor’s office
o Yerevan Illumination Company
47 “Green Urban Lighting” UNDP-GEF/00074869 project
o Yerevan Municipality department responsible for construction works
representatives from 3 other municipalities (selected by likelihood of them conducting future pilots
or commencing transformation)
Ministry of Energy, Republic of Armenia representative
These two working groups will take ownership, contributing to the decision-making processes during project
implementation, and ultimately provide endorsement of findings and adopted practices. Documentation of
the decision-making processes undertaken and procedures of technical analysis of lamp performance and
financial modelling within the working groups will become important resources for the continued roll out of
green urban lighting throughout the Republic of Armenia.
Well-structured and co-ordinated pilots will provide a suite of documentation for training and ensuing
transformation of street lighting to feasible energy efficient lamp technologies.
Demonstration Projects
Municipal Lighting Audits
Before changes to urban lighting practices can be proposed with justification, a detailed understanding of the
baseline (current) situation is required. This entails gaining an insight into the technical and financial
operations (a business profile) of urban lighting within the municipalities. To do this a municipal lighting
service audit, not just an energy audit, is required. The terms of reference for providing such a service should
include obtaining information in relation to:
Installation requirements
o Lighting level
o Operating hours
Lighting Surveys
o Current lamp stocks (including wattage)
o Current light levels of selected pilot areas
o Current energy consumption of selected pilot areas
Maintenance practices
o Spot replacement of failures
Identification/notification mechanisms of failed lamps/fixtures
Response time for replacements
o Bulk replacement of aged (but operational) lamps/fixtures
Replacement cycle
Scheduling
o Fixture cleaning cycles
Procurement practices
o Lamp/fixture performance specifications
o Warranty requirements
o Tendering/supplier panel arrangements
Financial aspects (annual)
o Lighting component costs
o Lighting maintenance labour costs
o Electricity usage/costs breakdown for lighting, illuminated commercial signage,
communication cabling
Analysis of the lighting audits will provide an insight into the opportunities for improving the energy
efficiency and cost reduction of operating the urban lighting.
1. Street lighting assessment tool
Another mechanism that could be utilised is the street lighting tool developed by SEAD ,the Super-Efficient
Equipment and Appliance Deployment (SEAD) initiative. SEAD is an initiative under the Clean Energy
48 “Green Urban Lighting” UNDP-GEF/00074869 project
Ministerial and the International Partnership for Energy Efficiency Cooperation and aims to make it easier
for governments and the private sector to reduce energy demand and carbon emissions.
In street lighting, the problem is that with new fixture choices, wattage and light distribution classifications
have less correlation with fixture performance on a specific road. Improved performance and energy savings
depend on proper fixture selection. The street lighting tool provides simplified photometric analysis,
integrated with energy and life cycle cost considerations, to allow lighting specifiers to find better fixtures
for their lighting upgrades.
The latest version (vers 1.6.0) also includes financial analysis in the form of a “Return on Investment”, ROI,
calculated for each year. This new feature will assist with the assessment of the feasibility of the piloted lamp
technologies and future technology transformations by verifying its applicability to the Armenian situation.
The tool, in the form of an excel spreadsheet is freely available from, http://superefficient.org/sltool.
Also a presentation on the features of the tool is available from
http://www.superefficient.org/en/Activities/Procurement/~/media/Files/Chennai%20SL%20Workshop%20Pr
esentations/Chennai%20Workshop_Demonstration%20of%20SEAD%20SL%20tool.pptx
2. Armenia Street Lighting Stock Model
The currently available information for street lighting lamp stock in the Republic of Armenia is very limited.
Updating this information through a questionnaire survey to the municipalities supplemented by expert
assessment would be beneficial to the planning of future pilots and understanding the opportunity for
financial and energy efficiency improvements in their operations. It also provides an opportunity to promote
the “Green Urban Lighting Project” and foster engagement by the municipalities. The currently developed
streetlight stock model and proposed pilots is provided in an accompanying excel file
(Pilots_analyses_and_Stock_model_v3.xlsx) to this report.
Technology (Lamp) Selection and Procurement Process
The energy efficiency opportunities will be determined by evaluation of the technical features of alternate
lamp technologies and their suitability for replacing existing lamps in the local environmental (eg
temperature, vibration & humidity) and electricity supply (voltage spikes & drops) conditions. These
technical features include:
White light appearance Capital cost
Colour Rendering Index (CRI) Lamp survival
Lamp efficacy Lumen Depreciation
OMR cost Lamp Life
Cost reduction opportunities will be determined by evaluation of the asset (including procurement practices)
and electricity costs, and predicted changes to maintenance practices (frequency of lamp/fixture
replacements and cleaning). In terms of a pilot, all of these elements must be recorded in some form of work
log to allow a full and proper financial analysis of the adoption of a new lamp technology to be undertaken.
A Technology Selection Report should then document the process up to and including preliminary selection
of lamp technologies for the pilots. A request for information forms the next step of the procurement process
this will ensure that manufacturers/suppliers are provided the opportunity to inform the Technical Working
Group of any lamp technologies not currently considered.
Following an analysis of the information provided in this process, manufacturers/suppliers are to be given a
further opportunity to inform Technical Working Group members of available technologies through a
Supplier/Manufacturer Workshop. The final decision on the lamp technologies to be piloted will have then
been informed based on information provided through a Public Request for Information and a
Supplier/Manufacturer Workshop. This process will ensure that the selection process considers all relevant
information in its decision making process.
Request for Information and analysis of information
Supplier / Manufacturer Workshop
Tender preparation and release
49 “Green Urban Lighting” UNDP-GEF/00074869 project
The procurement of lamps should be publicly offered for tender in the weeks following the workshop. Even
though luminaires will be procured, the pilot monitoring will only be in relation to the performance of the
lamp technology, not the brand. This is an important philosophy to remain mindful of with any pilot
demonstration, otherwise the competition to be the supplier of the lamps for the pilots can damage future
market competition. Therefore, there is to be no commercial advantage (inside running) for future projects to
the supplier of the luminaires or lamps for the pilots. That is, the pilots are promoted as being based on the
lamp technology (not brand) performance only, so that other quality lamp manufacturers who are not
selected for the pilots will still be able to benefit from the results of the trial, as the trial data should be made
public.
The tender specifications should state a requirement for the supply of:
independent accredited laboratory reports of lamp/luminaire performance
lighting design plans verifying compliance with specified lighting requirements for the nominated
pilot sites
a satisfactory warranty
commitment to availability of replacement components
For LED products, evidence of compliance to IEA 4E SSL Outdoor Lighting Tier 2 Performance
levels (ssl.iea-4e.org/files/otherfiles/0000/0056/Outdoor_Lighting_Performance_Tiers_Oct_2013.pdf) See
Appendix A.
A completed luminaire information form to assist the tender review panel should also accompany a tender
submission. Below is an example of such a form. The information requested may require adaption to the
local requirements.
50 “Green Urban Lighting” UNDP-GEF/00074869 project
Standard LED Luminaire Information Form
Company name
Product name
Model:
Total lamp lumen package (lumens):
Total electrical input power (Watts):
Sail area of fixture:
Weight of fixture:
Position of mounting of PE cell on fixture: select
Use of captive screws/clips on fixture for maintenance: select
Spiggott entry designed for 5 degree outreach upcast: select
IP rating: select
Electrical supply input of 230 Vac (+10% - 6%) at 50 Hz: select
Double insulation: select
IES or CIE files have been supplied electronically: select
Control gear modular cassette: select
UV stabilised acrylic cover/lens: select
Toughened glass cover/lens: select
Ability to self clean cover/lens: select
Unit price:
Fixture warranty for 3 year life of trial: select
Delivery time:
Note: For information only:
(Not to be
completed)
The fixture photometric performance will be assessed for maximum pole spacing for 8.0m
pole height with 20m road reserve with default poles positions of one quarter of road reserve.
Feedback will be given in the form of the table below with a "x" in the calculated spacing.
P5 compliant pole spacing (m).
<40 40 50 60 70
T
"T" indicates the target spacing for existing installations
Disclaimer: We reserve the right to extend the tender assessment criteria
51 “Green Urban Lighting” UNDP-GEF/00074869 project
Pilot Site Selection Process
Once the inefficient lamp technologies that it is proposed to replace have been identified, suitable pilot sites
for monitoring and demonstrating the energy savings and financial feasibility of such a technology change
need to be identified. The criteria for selecting these pilot sites should include consideration for:
Temperature, humidity and wind (vibration) extremes
Voltage supply variations (voltage spikes and voltage drops)
Typical road lighting configurations (including lighting level requirements, pole heights, road
widths)
Separate electrical feed to pilot light poles (exclusive of billboard and commercial signage lighting)
to enable energy monitoring
Ability to conduct lighting level audit (physical measurements) on road during pilot period
Conspicuity of the pilot to the general public for promoting the energy efficiency projects
The pilot site to be typical for labour practices involved with the maintenance of the poles/fixtures.
(ie no excessive degree of difficulty associated with accessing the poles/fixtures) This is so that
maintenance costs documented from the pilot are indicative of typical installations allowing for
reasonable financial analysis.
Ratification of Lamps and Pilot Sites Selections
Any pilot sites and replacement lamp technologies, that have already been proposed for upcoming
demonstrations scheduled in the first 12 month work plan, should be ratified by the Working Groups, using
the processes outlined above. This will secure stakeholder support and provide documentation of the process
that will become part of the pilot/transformation establishment procedures and training material for
municipalities beyond Yerevan.
Monitoring Protocols
Monitoring of the pilots should be conducted on a scientific measurement basis, which will require a factoring
in of a cost within the pilots. This monitoring must be reliable and transparent measurement of key lamp
performance criteria of and therefore conducted under the supervision of a local independent competent
lighting professional. This monitoring will entail
Periodic in-situ light and colour measurements (this will require some traffic control during
measurement) with calibrated equipment
Energy consumption monitoring (either at single poles or, if possible to isolate, the entire
distribution of the pilot area) with calibrated equipment
Weather data (temp, humidity, wind) for pilot location (possibly acquired from the Bureau of
Meteorology)
Installation, failure and maintenance logs (dates, times, pole location)
Failure cause analysis (failed lamps/fixtures should be recovered and returned to workshop for
failure cause analysis)
All data should be collected as automatically as feasible to ensure data integrity (eg a data-logger for energy
consumption). Data should be downloaded frequently (monthly) for security purposes and so that analysis can
be aggregated and monitored throughout the duration of the pilot. This assists with identifying either data
collection or lamp operation issues before an entire pilot project is compromised.
Pilot Performance Analysis and Reporting
The periodic lighting surveys along with weather and electrical supply conditions provide good information
to facilitate predictive lumen depreciation performance and lamp survival statistics. The reports should be
delivered in a manner that provides independence, objectivity and technology generality (in terms of non-
brand specific) so the results can be applied, without favour, to as many situations/locations as appropriate.
An example of an extensive long term streetlight trial can be found at: www.energex.com.au/about-
us/community-support/south-east-queensland-energy-efficient-street-lighting-trial.
52 “Green Urban Lighting” UNDP-GEF/00074869 project
Financing the Asset Changeover
The project has funds for asset changeover for the pilots proposed within the Green Urban lighting Project.
Identifying funding opportunities for the enduring sustainability of the street lighting transformation is a
critical component to this project.
The funds within this project are significant enough to provide the opportunity, (after robust technology
assessment and operational finance modelling) for an ongoing fixed budget commitment from the
Municipality of Yerevan to achieve savings that are reinvested into a rolling energy efficient technology
upgrade of the streetlight assets. This will be an effective demonstration of an initial investment providing an
increasing return.
During the project, other finance mechanisms for obtaining the initial stimulus funds need to be discovered
and promoted.
Another alternative mechanism worthy of consideration, which does not require a significant initial financial
outlay, is the outsourcing (contracting) to a 3rd
party (ie commercial entity) for the provision (ownership,
operation and maintenance) of street lighting to a municipality. The Finance Working Group could initially
examine this model (with prospective suitors) prior to facilitating a demonstration with an entire
municipality. One private entity providing such a service is Citelum (http://www.citelum.com/en).
Replication of Municipal Lighting Programs There are three key steps to the replication of municipal lighting programs.
1. Detailed knowledge of the baseline stock model
2. A methodology (with supporting documentation and templates) and trained personnel for assessing
the feasibility (financial and technical) for an energy efficient technology upgrade.
3. Seed funding to deliver the stimulus finance for the initial partial asset upgrade that creates the
savings to establish the rolling fund for progressive asset upgrades.
All three of these steps have been well covered in Section 0 above, but this highlights the necessity for all
steps before a municipal lighting program can be successfully initiated.
National Policies, Codes, and Standards on Lighting
National Stock Model
In order to justify the adoption of energy efficiency standards and codes for the purpose of energy saving and
associated greenhouse gas reduction, a relatively accurate stock model of the lamps in use is required.
In developing a national stock model for lamps used in the residential sector for this project, it was identified
that there was very little data that could be sourced to assist with the required calculations for either of the
accepted approaches to modelling. Using a top down approach, the percentage of electricity used in the
residential sector (as opposed to sectors such as industrial, commercial and rural) is required along with the
percentage of household electricity consumed by lighting (as opposed to heating, cooling and appliances).
No figures could be sourced for the latter of these parameters and the general consensus of the project team
is that the values published for the European Union, USA, Australia and global are lower than could be
expected in the republic of Armenia, (see Appendix B). Using a bottom up approach, details are required of
the typical lamp inventory for a home in the Republic of Armenia and the typical hours of use for each lamp.
Again, none of this information appears to be available.
Any implementation of an energy efficient lamp phase in will require a detailed understanding of the lamp
stock currently in use and any actual or perceived barriers to such a transition.
It is recommended that a phone survey be conducted on a selected sample of homes in various demographic
regions of the Republic of Armenia in to obtain the necessary information to build a representative
residential stock model and hours of use by room type. Questions should also be designed to gain an insight
into potential barriers to an energy efficient lamp transition. These questions may need some initial market
research to identify the key issues to engage on (eg price, light colour, life etc).
An energy audit could also be conducted on a smaller sample set of homes to obtain the percentage of
electricity consumed for lighting in homes. This would then allow verification of a calculation of the national
residential lighting energy consumption by both a top-down and bottom-up approach.
The currently developed residential stock model is provided in an accompanying excel file
(Calculation_of_IL_phase-out_effects_Armenia_(SC+AK)_07.02.2014.xlsx) to this report.
53 “Green Urban Lighting” UNDP-GEF/00074869 project
International Review of Standards and Codes
Another key strategy to implementing new national standards and codes in energy efficient lighting is to
consider harmonising with neighbouring or trading economies. This will facilitate trade and maintain market
competition in lighting products. It is recommended to conduct a review of the programs for energy efficient
lighting equipment in various countries (e.g. CIS countries, EU, China, USA.) for the last 5 years, including
the analysis of the regulatory basis of the programs (legislation, standards in force, methodologies accepted)
and the tendencies of their harmonization or transformation.
54 “Green Urban Lighting” UNDP-GEF/00074869 project
Summary of Recommended Actions
Establish two Working Groups to facilitate stakeholder engagement and participation in decision-
making processes (Section 0).
Formulate, conduct and document extensive lighting audits to establish a solid baseline stock model
(Section 0).
Develop and document a lamp technology selection process based on technological and financial
assessment criteria (Section 0).
Develop tender document templates (Section 0).
Develop and document a site selection process for future pilots (Section 0)
Ratify existing proposed lamp selections and pilot sites (Section 0)
Develop and document monitoring protocols for pilots (Section 0)
Once Finance Working Group is settled, engage with private street lighting service providers for
feasibility assessment (Section 0).
Conduct lighting survey of a sample of demographically representative homes throughout the
Republic of Armenia to revise the residential lamp stock model and typical hours of use (Section 0).
Conduct international review of energy efficient lighting standards and codes for the purposes of
consideration for strategic harmonisation (Section 0).
55 “Green Urban Lighting” UNDP-GEF/00074869 project
APPENDICES
Appendix A: IEA 4E SSL Outdoor Lighting Performance Tiers
57 “Green Urban Lighting” UNDP-GEF/00074869 project
Appendix B: Residential Sector Electricity Use for Lighting
USA:
EIA estimates that in 2011, about 461 billion kilowatt-hours (kWh) of electricity were used for lighting by
the residential and commercial sectors. This was equal to about 17% of the total electricity consumed by
both of these sectors and about 12% of total U.S. electricity consumption.
Residential lighting consumption was about 186 billion kWh or 13% of all residential electricity
consumption.
The commercial sector, which includes commercial and institutional buildings and public street and highway
lighting, consumed about 275 billion kWh for lighting or 21% of commercial sector electricity consumption
in 2011.
EIA does not have an estimate for only public street and highway lighting
http://www.eia.gov/tools/faqs/faq.cfm?id=99&t=3
European Union:
Although most citizens know that lighting is a substantial part of their electricity bill – between 8% and 23%
in the EU-15 – they are not aware that conventional bulbs are highly inefficient.
http://iet.jrc.ec.europa.eu/energyefficiency/residential-lighting
Lights Labours Lost (IEA Publication)
Residential-lighting characteristics in IEA countries
An estimated 372 TWh of electricity was used for domestic lighting in IEA countries in 2005, about 14.2%
of total residential electricity consumption. This is an increase of 17% from 319 TWh in 1995, or some 1.5%
per annum. The majority of this energy was used by low-efficiency incandescent lamps, but they are not the
dominant residential light source in all IEA countries, notably Japan. The most popular incandescent lamps
have rated power inputs of 60 W, yet a wide range of input power levels is available and in some EU
countries (e.g. Denmark, Sweden and Germany) the most common wattage is lower (typically 40 W).
Australia:
Percentage electricity used on lighting in residential sector is based on calculations from data within
publications below.
2005: 13.5% (pre phase-out)
http://www.energyrating.gov.au/resources/program-publications/?viewPublicationID=2141
1998: 9.5%
http://ee.ret.gov.au/energy-efficiency/publications/greenhouse-gas-emissions/australian-residential-building-
sector-greenhouse-gas-emissions-1990-2010