Geophysical Survey Report r covering Surface & Borehole Pulse EM Surveys over the Grasset Property . for Balmoral Resources during February - April 2014 by CRONE GEOPHYSICS & EXPLORATION LTD. Survey Area: Grasset Property, northwest of Montreal, Quebec. Survey Type: Surface & Borehole Pulse EM Surveys Survey Operator: Morgan Glynn, Guy Dumais, Scott Murray Surface Surveys: Loop 2014-1: Line 600E, 700E Loop 2014-2: Line 100E, 200E, 300E, 400E, 500E, 600E, 700E, 800E, 900E Loop 2014-3: Line 100E, 200E, 300E, 400E, 500E, 600E, 700E, 800E, 900E, 1000, 1100 Loop 2014-4BF: Line 900E Borehole Surveys: Loop 1: Hole GR-14-16, GR-14-17, GR-14-18, GR-14-19, GR-14-20, GR-14-20FG Loop 5: Hole GR-14-22, GR-14-23, GR-14-24, GR-14-25 Survey Period: February 20th — April 05th 2014 Report By: A.M. Khan Report Date: May 2014. GM 69008 Ressources naturelles et REÇU AU MRNF 05 MAI 2015 E _YIOd DES 117RE5 MINIERS eL..• . 10 JUIN 2015 )(1 Dir information géologique Documents complémentaires / Additional files Licence / License

Transcript of Geophysical survey report covering surface and borehole ...

Geophysical Survey Report

r covering

Surface & Borehole Pulse EM Surveys over the

Grasset Property.

for

Balmoral Resources during

February - April 2014

by

CRONE GEOPHYSICS & EXPLORATION LTD.

Survey Area: Grasset Property, northwest of Montreal, Quebec.

Survey Type: Surface & Borehole Pulse EM Surveys

Survey Operator: Morgan Glynn, Guy Dumais, Scott Murray

Surface Surveys: Loop 2014-1: Line 600E, 700E Loop 2014-2: Line 100E, 200E, 300E, 400E, 500E, 600E, 700E, 800E, 900E Loop 2014-3: Line 100E, 200E, 300E, 400E, 500E, 600E, 700E, 800E, 900E, 1000, 1100 Loop 2014-4BF: Line 900E

Borehole Surveys: Loop 1: Hole GR-14-16, GR-14-17, GR-14-18, GR-14-19, GR-14-20, GR-14-20FG Loop 5: Hole GR-14-22, GR-14-23, GR-14-24, GR-14-25

Survey Period: February 20th — April 05th 2014

Report By: A.M. Khan

Report Date: May 2014.

GM 69008 Ressources naturelles et

REÇU AU MRNF

05 MAI 2015

E _YIOd DES 117RE5 MINIERS eL..• .

10 JUIN 2015 )(1 Dir information géologique

Documents complémentaires / Additional files

Licence / License

Crone Geophysics & Exploration Ltd.

TABLE OF CONTENTS

PULSE ELECTROMAGNETIC SURVEY

1.0 INTRODUCTION

2.0 PROPERTY LOCATION

3.0 PERSONNEL

4.0 SURVEY METHODS

5.0 SURVEY PARAMETERS

6.0 PRODUCTION SUMMARY

APPENDICES

APPENDIX I: PROFILE PLAN MAPS

APPENDIX II: LINEAR (5-AXIS) PULSE EM DATA PROFILES

APPENDIX III: PULSE EM DATA PROFILES (LIN-LOG SCALE)

APPENDIX IV: STEP RESPONSE DATA PROFILES

APPENDIX V: CRONE INSTRUMENT SPECIFICATIONS

APPENDIX VI: STATEMENT OF QUALIFICATIONS

APPENDIX VII: LIST OF EXPENDETURES

Geophysical Survey Report

C~ a

Crone Geophysics & Exploration Ltd.

LIST OF FIGURES

FIGURE 1: GRAS SET PROPERTY GENERAL LOCATION GOOGLE MAP

FIGURE 2: PROPERTY LOCATION MAP

FIGURE 3: REGIONAL GEOLOGY MAP

FIGURE 4: VTEM & 2014 TDEM SURVEY PLAN MAP 1

FIGURE 5: 2014 TDEM SURVEY PLAN MAP2

FIGURE 6: LOOP 2014-1 MAP SHOWING DETAILS OF TDEM SURVEYED LINE COVERAGE

FIGURE 7: LOOP 2014-2 MAP SHOWING DETAILS OF TDEM SURVEYED LINE COVERAGE

FIGURE 8: LOOP 2014-3 MAP SHOWING DETAILS OF TDEM SURVEYED LINE COVERAGE

FIGURE 9: BUTTERFLY LOOP 2014-4BF MAP SHOWING DETAILS OF TDEM SURVEYED LINE 900E

FIGURE 10: LOOP-1 & SURVEYED HOLE GR-14-16, 17, 18, 19, 20 LOCATION MAP

FIGURE 11: LOOP-5 & SURVEYED HOLE GR-14-22, 23, 24, 25 LOCATION MAP

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

LIST OF TABLES

TABLE I: SURFACE SURVEY TRANSMITTER LOOP COVERAGE

TABLE II: SURFACE SURVEY COVERAGE

TABLE III: BOREHOLE SURVEY TRANSMITTER LOOP COVERAGE

TABLE IV: BOREHOLE SURVEY COVERAGE

TABLE V: 22-CHANNEL CONFIGURATION FOR THE 50.00 ms TIME BASE (INDUCTION PROBE)

TABLE VI: 25-CHANNEL CONFIGURATION FOR THE 100.00 ms TIME BASE (FLUXGATE PROBE)

TABLE VII: PRODUCTION SUMMARY

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

1.0 INTRODUCTION

Crone Geophysics & Exploration Limited was contracted by Balmoral Resources to conduct Borehole/Surface Pulse Electromagnetic Surveys on its Grasset Property located northwest of Montreal, Quebec. This report summarizes the geophysical work carried out in February 20th — April 05th 2014.

Twenty three (23) surface lines utilizing four (4) separate surface loops and nine (9) holes were surveyed from two separate transmitter loops during this survey period. The appendices to this report contain page size plan/section maps, PEM profiles (linear 5-axis and logarithmic scale), Step response profile plots and the Crone Instrument Specifications.

2.0 PROPERTY LOCATION & ACCESS

The Grasset Property is located about 600 kilometers northwest of Montreal, Quebec along the Detour-Sunday Lake Deformation Zone which hosts the Detour Lake Gold deposit 80 kilometers to the west.

The Property is accessed via a series of recent logging roads and exploration work on the property is conducted out of the Companies Fenelon exploration camp located approximately 3 kilometers west of the property.

Geophysical Survey Report

1

Grasset Property •

TrrnminssON

16

17 18

Gn aterSudbury \

O

Michigan

Crone Geophysics & Exploration Ltd.

Figure 1: Grasset Property General Location Google Map

Geophysical Survey Report

C~ a

DOIGT HARKI

J.J

DETOUR EAST [rtjpn .b

) ,

Selbaie Mine Past Producer (Cu, Zn, Au)

, Matagami ~ , ,

~Cu,Zn. Au, Ag

011.1110

BALMORA4, 0 5 10 20 30 40 Kilometres

Casa Berardi Fault Zone ti

Estrades Mine Past Producer (Cu, Zn. Aul --

(Joutelu

Poirier Mlne -Nik fast Producer (Au)

Past ProclucerlCopper10 .~

LA MARTINIERE

% Casa-Berardi (Au) Aurizon / Hecla

Crone Geophysics & Exploration Ltd.

Figure 2: Property Location Map

Geophysical Survey Report

eu

.y x ae

`C2 Balmoral Resources

Oe Jr Matagami n 114 Cu, Zn, Au, Ag >40M tons

Sunday. Lake- ou

'n Selbaie Mine,

53Mt @ 1% Cu, 2.0% Zn & 0.6 g/t Au

Kirkland

24M Oz

7

I I

Legend

Balmoral Claims

Geology

Timiskaming Sediments

Cobalt Plate

Felsic Intrusive

Kap High

Mafic/Uaramafic Valcanbs

V=ega

--' Alt Cas a-Berar des Mine 1

>3M OZ Au (Poly-Metallic) r

1 Douay Poirier Mine

1.85M Oz Au (Copper)

Joute) 1.1 M Oz Au

erardi Fault

Lennox rPn

Timmins 71MOzAu

Ô 6

ine De stor Fa /t

0 12.5 25 50 75 100 125 Kilometers

21MOzAu

ouyn Noranda Larder Lake 19M Oz Au 13M Oz Au

Detour Lake Mine

17M Oz Au

BALMORAL

Crone Geophysics & Exploration Ltd.

Figure 3: Regional Geology Map

Geophysical Survey Report

~~ 0

Crone Geophysics & Exploration Ltd.

'. / / /~ _

e

/

/ OP"' //

/

/

/

/

/ / ~

~ ;

/

• .

GR-14 16 / . /

/

/ ~ . ,

/ /

~ / / /

W / -• j] / . / / GR-1419

*141/1:1:1

i

~

_

/ / ¢

V

/

C7 ~ •

• ' ~

/

~~~

/ /.

/ / /

.,

/ / . , j f GR-1420

! ' /

'41.

7j'I /'

\

0 Gâ2-14178.18

Legend

/ l • ~ 2012.01. 0. EPA a May cm.mo,s

„ Red Lines = Prefered Surface I EM Lite Options Lhes ~~gy- - e lP

! /

o.y. .

0 50 100 200 300 400 500

Project: G rasset GRASSET

Geotech VTEM BFM6 (Gridded 8 Colour Stretched)

IA.

RAI MORAL

Meter.

Projection:UTM scale: 1:7.500 MADe9, Zone 1711 R. Mann Feb 21, 2014

Figure 4: VTEM & 2014 TDEM Survey Plan Mapl

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

678 BOO 679 000 679 ZOO 6T9 BOO 679 600 EA 100 MO On 680 200 680 000 620 goo

• N. .- ~ ' Pi

' • • ; • • • •..,*

• • t 1

~• .•

• ' ~ • .

• •

~ vi

I a

....•

p / . .' . . ~ .

~ 1 ® 49~

, N;

. . .

le ~

' •

~ GR-14-20

~ .

.

' i

1

C•b

~q~j

`a . , . ,' • _ _' _ .~ • . 4 t

~ ~. . . . .- . O

~ GR-1417818

• ~

~I • ...Mk

~

-

. ~

. •

'

.

.

.

'

.

il

ow os ,1111 - aw •«•2• .•

Legend

• a n 2•2n.•..•pf..., .• ee•en«.

~ aen..,b..e.a. e•

~n

0 50 100 200 300 400 500

Project: Grasset GRASSET

BHEM- Sat Image a

BALMORAL

Meters

Projection: DTM Scale: 1:7.500 NAD63• Zone 17N R.Mann Feb 21,2014

Figure 5: 2014 TDEM Survey Plan Map2

Geophysical Survey Report

C~ a

Crone Geophysics & Exploration Ltd.

Figure 6: Loop 2014-1 Map showing details of TDEMSurveyed Lines coverage

Geophysical Survey Report

C~ a

Crone Geophysics & Exploration Ltd.

Figure 7: Loop 2014-2 Map showing details of TDEM Surveyed Line Coverage

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

Figure 8: Loop 2014-3 Map showing details of TDEM Surveyed Line Coverage

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

Figure 9: Butterfly Loop 2014-4BF Map showing details of TDEM Surveyed Line 900E

Geophysical Survey Report

C~ a

281 •n

748m

Grasset Project

Crone Geophysics & Exploration Ltd.

Figure 10: Loop -1 & Surveyed Hole GR-14-16, 17, 18, 19, 20 Location Map

Geophysical Survey Report

CliCG-18

Crone Geophysics & Exploration Ltd.

Figure 11: Loop -5& Surveyed Hole GR-14-22, 23, 24, 25 Location Map

3.0 PERSONNEL

The personnel involved in this project during the reporting period include:

Survey Operator: Morgan Glynn, Guy Dumais, Scott Murray

Data Processing / Data Discussion: Kevin Ralph

Report: A.M. Khan

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

4.0 SURVEY METHODS

Crone Pulse EM is a time domain electromagnetic method in which a precise pulse of current with a controlled linear shut off is transmitted through a large loop of wire on the ground and the rate of decay of the induced secondary field is measured across a series of time windows during the off-time. The EMF created by the shutting-off of the current induces eddy currents in nearby conductive material thus setting-up a secondary magnetic field. When the primary field is terminated, this magnetic field will decay with time. The amplitude of the secondary field and the decay rate are dependent on the quality and size of the conductor.

On this project, a 3D Borehole Pulse EM system was assembled in which an axial component (Z) probe and a cross component (XY) probe were used to measure the three components of the induced secondary field. The first pass with the 'Z' probe detects any in-hole or off-hole anomalies and gives information on size, conductivity, and distances to the edge of conductors. The second pass with the `XY' probe measures two orthogonal components of the EM field in a plane orientated at right angles to the borehole. These results give directional information to the center of the conductive body. Data is usually collected at a nominal sample interval of 10m.

In addition to measuring the standard Primary Pulse channel on the ramp and 20 off-time channels, the Step Response may also be calculated. Step Response requires accurate geometrical control in which the loop position and the hole geometry are accurately determined. In the current surveys positional information was collected by Crone using a sub-meter capable GPS and regional base station. Positional information is provided in the UTM projection (zone 17 North), utilizing the NAD 1983 Canada datum. Elevations are given relative to Mean Sea Level based on the EGM96 Global geoids model.

The calculated Step Response values are binned into an S1 channel (from 0.5T to T), an S2 channel (from 0.25T to 0.5T), an S3 channel (from 0.125T to 0.25T) and an S4 channel (from 0.0625T to 0.125T, where T is the time base). The S1 channel is normalized to the theoretical primary field, while S2, S3 and S4 are normalized to 51. The 51 value is used to identify responses from highly conductive sources. In the absence of any conductors the Primary Field should exactly equal the theoretical field for a given component. In the case of generally resistive host and poorer conductors the S1 value will be very close or equal to the theoretical field for a given component

The borehole surveys were carried out using time base of 50.00 ms, off-time channels 1 — 22 for loop 1 (Table V) and off-time channels 1 - 24 for loop 5(Table VI) with a 1.5 ms shut-off ramp time. The primary inducing field is defined as positive up inside the transmitter loop.

Geophysical Survey Report

CliCG-18

Crone Geophysics & Exploration Ltd.

Fluxgate surveys were carried out on Hole GR-14-20FG using a time base of 100.00 ms (2.5 Hz), with a 1.5 ms shut-off ramp time and 25 off time channels (Table VII).

The surface surveys were carried out using a time base of and 50.00 ms, off-time channels 1 - 22 with a 1.5 shut-off ramp time (Table V). The primary inducing field is defined as positive up inside the transmitter loop.

A butterfly loop 2014-4BF (Figure -9) was used for the survey of line 900E.

The equipment used on this project was a Crone Pulse EM Borehole system. This includes a 4.8 kW transmitter with a 220V voltage regulator which is powered by an 11 hp motor generator. The Crone Digital Receiver was used to collect the field data. The synchronization between the Transmitter and the Receiver was maintained by direct cable link.

Data units are nT/s inductive probe and pT for Fluxgate.

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

5.0 SURVEY PARAMETERS

Table I: Surface Transmitter Loon Coverage

Loop Property Size

( meters)

Corner Coordinates

UTM NAD83 Zonel7N

2014-1 Grasset Project 500 x 500 679543E, 679734E,

5540134N 5539462N

679302E, 679987E,

5539722N 5539900N

2014-2 Grasset Project 800 x 1200 679278E, 679986E,

5540275N 5539032N

678936E, 680345E,

5539642N 5539704N

2014 3 Grasset Project 1300 x 1200 679574E, 679983E,

5540780N 5539041N

678916E, 680608E,

5539655N 5540171N

2014-4BF 679441E, 5539356N 679985E, 5539043N

(Butterfly Grasset Project 600 x300 680123E, 5539314N 679592E, 5539608N

Loop) 679944E, 680608E,

5540213N 5540173N

680454E, 680087E,

5539913N 5540483N

Table II: Surface Survey Coverage

Line TX loop Time base

(ms)

Off Time Channels

Ramp

(ms)

Current

(Amps)

Station Length

(m) Comp

From To

600E 2014-1 50.00 22 1.5 25 550 850 300 X,Z

700E 2014-1 50.00 22 1.5 25 -650 650 1300 X,Z

100E 2014-2 50.00 22 1.5 14 -600 650 1250 X,Z

200E 2014-2 50.00 22 1.5 14 -600 650 1250 X,Z

300E 2014-2 50.00 22 1.5 14 -600 650 1250 X,Z

450E 2014-2 50.00 22 1.5 14 -600 650 1250 X,Z

500E 2014-2 50.00 22 1.5 14 -600 650 1250 X,Z

600E 2014-2 50.00 22 1.5 14 -600 650 1250 X,Z

700E 2014-2 50.00 22 1.5 14 -600 650 1250 X,Z

800E 2014-2 50.00 22 1.5 14 -600 650 1250 X,Z

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

900E 2014-2 50.00 22 1.5 14 -600 650 1250 X,Z

100E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

200E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

300E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

400E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

500E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

600E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

700E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

800E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

900E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

1000E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

1100E 2014-3 50.00 22 1.5 12 -400 400 800 X,Z

900E 2014-4BF 50.00 22 1.5 13 -325 300 625 X,Z

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

Table III: Borehole Survey Transmitter Loon Coverage

Loop Property Size

( meters)

Corner Coordinates

UTM NAD83 Zonel7N

1 Grasset Project 500 x 500 679543E, 5540133N679303E, 5539721N 679737E, 5539461N679987E, 5539900N

5 Grasset Project 750 x 800 679369E, 5540228N679004E, 5539605N 679693E, 5539204N680081E, 5539862N

Table IV: Borehole Survey Coverage

Hole TX

Time base

Off Time Channels

Ramp Current Comp p

Station (m) Length

(ms) (#) (ms) (Amps) From To (m)

GR-14-16 1 50.0 22 1.5 25 100 290 190 X,Y,Z

GR-14-17 1 50.0 22 1.5 25 100 245 145 X,Y,Z

GR-14-18 1 50.0 22 1.5 25 80 210 130 X,Y,Z

GR-14-19 1 50.0 22 1.5 25 80 160 80 X,Y,Z

GR-14-20 1 50.0 22 1.5 25 110 280 170 X,Y,Z

GR-14-20FG 1 100.0 25 1.5 25 100 285 185 X,Y,Z

GR-14-22 5 50.0 24 1.5 22 150 320 170 X,Y,Z

GR-14-23 5 50.0 24 1.5 22 170 320 150 X,Y,Z

GR-14-24 5 50.0 24 1.5 22 90 300 210 X,Y,Z

GR-14-25 5 50.0 24 1.5 22 80 510 430 X,Y,Z

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

The following table shows the various time gates that constitute the channel configurations set up in the Crone PEM Receiver used in the surveys discussed in this report. This 50.00 ms timebase uses off-time channels 1 - 22.

Table V: 22-Channel Configuration for the 50.00 ms time base (Induction Probe Channel Start Finish Channel Start Finish

PP -2.000e-04 -1.000e-04 1 4.800e-05 6.400e-05 2 6.400e-05 8.400e-05 3 8.400e-05 1.120e-04 4 1.120e-04 1.520e-04 5 1.520e-04 2.040e-04 6 2.040e-04 2.680e-04 7 2.680e-04 3.600e-04 8 3.600e-04 4.800e-04 9 4.800e-04 6.400e-04 10 6.400e-04 8.480e-04

11 8.480e-04 1.128e-03 12 1.128e-03 1.496e-03 13 1.496e-03 1.992e-03 14 1.992e-03 2.644e-03 15 2.644e-03 3.512e-03 16 3.512e-03 4.664e-03 17 4.664e-03 6.192e-03 18 6.192e-03 8.220e-03 19 8.220e-03 1.092e-02 20 1.092e-02 1.440e-02 21 1.440e-02 3.107e-02 22 3.107e-02 4.774e-02

The following table shows the various time gates that constitute the channel configurations set up in the Crone PEM Receiver used in the surveys discussed in this report. This 50.00 ms timebase uses off-time channels 1 - 24.

Table VI: 24-Channel Configuration for the 50.00 ms time base (Induction Probe) Channel Start Finish Channel Start Finish

PP -2.000e-04 -1.000e-04 1 4.800e-05 6.400e-05 2 6.400e-05 8.400e-05 3 8.400e-05 1.120e-04 4 1.120e-04 1.520e-04 5 1.520e-04 2.040e-04 6 2.040e-04 2.680e-04 7 2.680e-04 3.600e-04 8 3.600e-04 4.800e-04 9 4.800e-04 6.400e-04 10 6.400e-04 8.480e-04

11 8.480e-04 1.128e-03 12 1.128e-03 1.496e-03 13 1.496e-03 1.992e-03 14 1.992e-03 2.644e-03 15 2.644e-03 3.512e-03 16 3.512e-03 4.664e-03 17 4.664e-03 6.192e-03 18 6.192e-03 8.220e-03 19 8.220e-03 1.092e-02 20 1.092e-02 1.440e-02 21 1.440e-02 1.770e-02 22 1.770e-02 2.770e-02 23 2.770e-02 3.770e-02 24 3.770e-02 4.770e-02

Geophysical Survey Report

%a

Crone Geophysics & Exploration Ltd.

Table VII: 25-Channel Configuration for the 100.00ms time base (Flux ate Probe) Channel Start Finish Channel Start Finish

PP -1.900e-03 -1.800e-03

1 4.800e-05 6.400e-05 2 6.400e-05 8.400e-05

3 8.400e-05 1.120e-04 4 1.120e-04 1.520e-04

5 1.520e-04 2.040e-04 6 2.040e-04 2.680e-04

7 2.680e-04 3.600e-04 8 3.600e-04 4.800e-04

9 4.800e-04 6.400e-04 10 6.400e-04 8.480e-04

11 8.480e-04 1.128e-03 12 1.128e-03 1.496e-03

13 1.496e-03 1.992e-03 14 1.992e-03 2.644e-03

15 2.644e-03 3.512e-03 16 3.512e-03 4.664e-03

17 4.664e-03 6.192e-03 18 6.192e-03 8.220e-03

19 8.220e-03 1.092e-02 20 1.092e-02 1.440e-02

21 1.440e-02 3.107e-02 22 3.107e-02 4.774e-02

23 4.774e-02 6.440e-02 24 6.440e-02 8.107e-02

25 8.107e-02 9.774e-02

6.0 PRODUCTION SUMMARY

Table VIII: Production Summar

20-Feb-2014 MOB.

21-Feb-2014 MOB.

22-Feb-2014 Surveyed GR-14-20 while Jordan was gpsing the loop finished the hole then moved on to GR-14-17 dummied the hole, surveyed the Z.

23-Feb-2014 Finished survey on hole GR-14-17, hole 18 and hole GR-14-19.

24-Feb-2014 Surveyed GR-14-16 then moved on to hole GR-14-20 with the fluxgate finished. Used 100 time base with fluxgate

25-Feb-2014 Surveyed line 700 finished that line then got a start on line 600 of loop-1 got 300 meters.

26-Feb-2014 Picked up most of the first loop TX-1 left one side out for the next loop then got the next loop all out and ready to go and packed dow a little bit of the lines for surveying.

27-Feb-2014 Went to Val Dor to drop off Jordan and pick up Charlie and went back to camp.

28-Feb-2014 Set up and started to survey while Charlie was Gpsing the loop finished line 100 of loop-2.

01-Mar-2014 Surveyed line 200 finished and moved onto line 300 and finished.

02-Mar-2014 Surveyed on line 400 finished and moved on to line 400 and finished.

03-Mar-2014 Surveyed on line 400, loop-2 finished and moved on to line 400 and completed. Went and broke trail for lines 800 and 900 for tomorrow.

Geophysical Survey Report

%a

Crone Geophysics & Exploration Ltd.

04-Mar-2014 Surveyed on line 800 finished and moved on to line 900 and finished loop-2 then went and borke trail for lines 1000 and 1100 for tomorrow.

05-Mar-2014 Got caught up on the Gps then waited for the plan then picked up most of the loop and left the south edge.

06-Mar-2014 Laid out loop.

07-Mar-2014 Surveyed on line 100 of loop-3.

08-Mar-2014 Surveyed on line 200,300,400.

09-Mar-2014 Surveyed on line 500,600.700

10-Mar-2014 Surveyed on line 800, 1000.

11-Mar-2014 Surveyed on line 1100

12-Mar-2014 Surveyed on line 900.

13-Mar-2014 Surveyed on line 900BF.

14-Mar-2014 Picked up loop, packed up gear.

15-Mar-2014 Operator DEMOB.

16-Mar-2014 Operator DEMOB.

28-Mar-2014 Operator Mob.

29-Mar-2014 Operator Mob.

30-Mar-2014 Surveyed hole GR-14-24.

01-Apr-2014 Surveyed continuous mag on holes GR-14-24, GR-14-20.

02-Apr-2014 Surveyed hole GR-14-25 at the Grasset grid.

03-Apr-2014 Surveyed holes GR-14-22, GR-14-23, picked up loop 5 and packed up the truck and trailer.

04-Apr-2014 DEMOB.

05-Apr-2014 DEMOB.

Respectfully submitted,

A.M. Khan, M.Sc.

Crone Geophysics & Exploration Ltd.

Geophysical Survey Report

Crone Geophysics & Exploration Ltd.

APPENDIX I

PROFILE PLAN MAPS

Geophysical Survey Report

C~ a

5540000N —

5539500N

5540500N

Scale 1:15000 250 0 250

(meters)

679500E 680000E 680500E I I I

5539000N

Balmoral Resources Grasset Project

Surface Pulse G Survey

Lines & Loon Location NOD

Loon: 201 4-1 Survey Date: February 25, 2014

Crone Geophysics & Exploration Ltd,

554071.N679300E 679400E 679500E 679600E 679,00E 679800E 679900E 660000E 680100E 680200E

5541,110rv

5540600N- -5549600N

/

5540500N- ~ -5549500N

/~

5540409N- -5549400N

5540300N-

III ï,

~ -554030011

0540200N - - 55492004

5540100N - - 5540100N

~ 5540009N - - ~ - 5599000N

5539900N - 5539900N

553900arv- Tv Loop 2014-1 ' - 5535600rv

, 55.355.3970,1-9]o- -553971orv

6

5539600N- . - 5539600N

5539500N- -• -55395004

Data Scale

~ 0.,-leel

: ,...adf

a6 6 a a

553940919- -55394004

Scale 1:2500 j m m im / f....1

5539300N- / -5539300N Balmoral Resources Grasset Project (Loop 2014-1)

Surface Pules EM Survey

Loop Location Mop i 579392E

I 579900E

i 079500E

I i 079500E 0]9]00E

i 579800E

I 079909E

i 550000E

I 099100E

i 5E0290E Horizontal X Component

Rn16

CYa',aCaaAhyaka k ExPforetlen Ltd _

554071.N679300E 679400E 679500E 679600E 679,00E 679800E 679900E 680000E 680100E 680200E

5541,110rv

5540600N- -5549600N

/ -

5540500N- ~ -554-0SOON

. /

/ /

9540409N- 9549400N

! /

5540300N- -5540300N

i '

--ss49z9aN

- ~ ~ - 5540100N

559-0000N - - i'~ - 559-9000N

41

~/

5539900N- ., -5539900N

55390000- Tv Loop 2014-1 ' -553000011

55.3970,1- 553971.1

5539600N- . -5539600N

. JIP _ ii _

5539500N- -• -55395005

%

Data Scola (r.-ivel

1 r -I: 16• 5• 4•

9539409N- -9539400N .e.ade/a

e 9colem:2500 c. m

Im•N

5539300N- -5539300N Balmoral Resources Grosset Project (Loop 2014-1)

Surface Pules EM Survey

Loop Location Mop 079390E 879900E 079500E 079000E 0]9]00E 979800E 079909E 080000E 889100E 5E0200E Vertical Z Component

Rn16

bnnau CaaAhyaka k E:Plomtlen Ltd_

680000E 680500E I I

679500E 679000E

G Survey Surface Pulse

Boreho e Loos Location Man

Scale 1:15000 250 0 250

(meters)

5539000N

5540500N

5540000N —

5539500N

Balmoral Resources Grasset Project

Loon: 2014-2 Survey date: March 2014

Crone Geophysics & Exploration Ltd,

680000E 680500E I I

679500E 679000E

1 Survey Surface Pulse

Boreho e Loos Location Man

Scale 1:15000 250 0 250

(meters)

5540500N —

5540000N

3

5539500N —

Balmoral Resources Grasset sroject

Loon: 2014-3 Survey date: March 7-11, 2014

Crone Geophysics & Exploration Ltd,

679500E

680000E

680500E

5540500N

5540000N —

5539500N —

5539000N

Scale 1:15000 250 0 250

(meters)

Balmoral Resources Grasset sroject

Surface Pulse V1 Survey

Lines & Looc Location Na u

Butterfly Loo c: 201 4-4BF Survey Date: March 13, 2014

Crone Geophysics & Exploration Ltd.

5540500N- -5540500H

554040014- - 5540400H

5540300 N - ' - - 5540300H

554020014- - . -5540206H

554010014- , -5540106H

554000014- / -554000611

.

553990014- -553990611

5539E001.1- -5539E0611

144BF

563970O14- , ~

-5539]0611

l

5539E0014- ~ -5339W011

5539500N- . / / -5339500N

5539400N- - 53394001

5539300N- ' -53393001

if

5539200N -5339200N oSoule Oon' ~

• A A A-LI{ b 1. 4

5539100N- -55391001 ® e im im Nee1

8afmorof Resources Croeee1 project (Loop 2014-413F)

Su rto ce Pulse EN Survey 663 1- 9000 - 65390001 Loop Location Nap

679400E 679500E 679600E 679700E 679900E 679900E 090000E 630100E 6E0200E 630300E 630400E 630500E 690600E HonzonFol X Corn ponenl SLUMP Ern Nora 15..14

crcr. 0.opWsiaa n 6ryrt,oLiam Lm.

879.1-ME 979.0E 97911100E 9797110E Felsooe 6790KIE 6.90000E 6.901NIE MIME. 0.1311.363E 8.1313.1-03E 0.1305CAE 0901900E

5540500N- -5544500N

55404001.1- -55494000

55403001.1- ' - -55443001.

55402001.I- - . -55442001.

55401001.1- , -55441001.

55400001.1- -55440000

55399000- -55399000

~

5539000N-

f./

-55390060

'4 AL

).7T

5639700N- , - 55397000

55.596001.1 - 553960011

.

663 0 9600 - • / -53395000

55394001.I- -55399000

55393001.1- ' -55393000

if

553920014 -5339200N Moto ' Soule

• A A A-LI{ b 1. 4

553910014- -55391000 ® 5 im im Ne 0

8almoraf Resources Croeeet project (Loop 2014-413F)

SLAY LE PL116E EN survey 65350001.1- -04090001.1 Loop Location Nap

679433E 6795500E 679600E 679700E 079000E 079900E 090000E 600100E 600600E 600300E 600900E 600500E 050600E VSrticol Z Component SLUMP Ern Nora 15..14

cmr. 415pWsiaa n Eryrt,5Liam Lm.

679400E 679600E 679800E 680000E

5540200N

Scale 1:7500 goo o oo

(meters)

5539400N

5540000N

5559800N —

5559600N

Ralmorcl Resources Grasset Project

3—C Borehole Pulse 7v Survey

Boreho e & Loon Location Con

Hole: GR-14-16 Survey Date: February 24, 2014

Crone Geophysics o Exploration Ltd.

Balm oral Resources Grasset roj ect

3—D Beres o e se EM Survey

Hole Section w its Primary Fie d

e: GR-14-16,Loop Survey Date, Februory 24, 2014

o

Crone Geophysics & Ex plo ra tion L td

679696E,5540209N

679552E,5539941N GP-14-16

, ~\\,\,\, 1 \\--z/ 1 1 1? 1 1 Hill i P 1 L ~1 / / 1 1 11 11 f 1

ï111P1111 N 1 1 T11

/r1ïTT11 1111T

/ l / /4 /l' ï

//1 / / 7 1 1 1 /1I1 ï 1

,//11/// /~~ï1 ~ z ~~/'~~% m

i~~//

1 DD - y

----- 7-'/- // 1 11 / I zzi / 1

// / / /11 i 1 z / 1

/ r / / l / 111// / î l / // //

.77// // / 11 1 >' / / l l / / / I 1

1DD / / /

~~~~ --- ~~ _----.~i// J/if 1 % / / / / / it / I --_-- --.--- -----~ -5- ~- ---' / ,--/ / / /' 1 / / / / / / / 1 1

~ ~~ ~ ~-~ ~ ---- //`f I /' / / / / / / / / / I ~~ ----- --- ~,-- Ç- - , z-z/'////4 /// // / / / - -- _ ---' ---'- - -' ----". ,-.-- / / / / / / / / / / / / / I ---- ~»,- ~~ - / /' x• / / / / / / / / / / / / / 1 ---- .-~,-~,--- //' z'///i1 / / / / / / / / I

// //////// // / 1

scQie 1:25oa 25 D 25 50

eters)

679200E 679400E 679800E 680000E 679500E

5540200N

Scale 1:7500 goo o oo

(meters)

5539400N

5540000N

9

5559800N —

5539600N

Ralmorcl Resources Grasset Project

3—C Borehole Pulse 7v Survey

Boreho e & Loon Location Con

Hole: GR-14-17 Survey Date: February 23, 2014

Crone Geophysics o Exploration Ltd.

579773E,5539724N 679916E>553992N GR-1 4-17

2DD

i I / % / / / ï i ,----- ////// 1

,L\N------ //111f1f1r

f//l/ll1 „-~7/7 / / / / / / i

- z. / /' / / l / / /

~-d~77//1//il'1I

1 DD

D

1 DD

Scale 1!2,500 50 a 50

(mete rs)

BoIm oral Resources Gresset Project

3—D Bo re nol e 7 u lse E v Survey Hale 5eoti on with ri mory fl e c

ole: GR-1 4-17, Loop Survey Date: February 23, 2014

Crane Geophysics 2c Explora~io n L~d ,

679400E 679600E 679800E 680000E

5540200N

Scale 1:7500 goo o oo

(meters)

Ralmorcl Resources Grasset Project

3—C Borehole Pulse 7v Survey

Boreho e & Loon Location Con

Hole: GR-14-18 Survey Date: February 23, 2014

Crone Geophysics o Exploration Ltd.

5539400N

5540000N

5559800N —

5559600N

67986E,553956N

1 1 1 1 1 ----/ / I I

IIT T11 1 1 1 1 I 1' II 1 1111P 1 I IïP

I] 1 1 1_ 1 /1/ / / / / I 1 / 1

/ / 7 1 I 1~ ï / i l / ////llI 11

z//i//7/IÎ1P J/ / / / / 7 / l l 1 ~

7f ///// 1/I 1 00,z /7/ / 1/ 1

J/'//// / / / 71> / 1 7I/~~~//~l/111 /r/~/////17111 x / I l I

1 / • / //i//7/ 7111

Q,////////7/ l

1////////

/ ///////7// 1/1 / / /

//I1/ l / //////l' //' I / l I

1o0,// // //// l l / I l 1 //// /1

579752E 1 5539689N

I9 / 1 1 1 1 11 / 1 1 11 11

1 1

1 1 11 1 1 11 1 1 11

11 1 1 /

GR-1 4-1 8

Scale 1:2500 25 fl 25 50

(meters)

Balmoral Resources Grasset Droi'ect

3—D Bore-10 e se -M Survey o le Soctla n with ri m a ry =le d

c e: GR-14-1 B,LDoD Survey Date, February 23 2D14

Crone Geophysics ck Exploration Ltd_

679400E 679600E 679800E 680000E

5540200N

Scale 1:7500 goo o oo

(meters)

5539400N

5540000N

5559800N —

5559600N

Ralmorcl Resources Grasset Project

3—C Borehole Pulse 7v Survey

Boreho e & Loon Location Con

Hole: GR-14-19 Survey Date: February 23, 2014

Crone Geophysics o Exploration Ltd.

77J//' / / / / / / / / 7//'J// / / / / / / / / / ~ 77

679933E,5539994N 679774E,5539734N GR-14-19

4 P1t11f 1ff1

l P 1 P 1 1

//lI P / 1 is //// / 1 ~

l'7/l / f

200

// // / / 1 1 /1 /1

/1

/1 /1

/ / 1 1 / 1 1 1 / / / 1

Balm orol Res Drc es Grasset Project

3—D Boreho e se Ev Survey

Hole 5ection with Pr'I mcry =le c

H e e: /1--19 , soap Survey Dote: February 23. 2014

Crone Geophysics & Exploration Ltd.

Scale 1:2500 25 6 25 50

(meters)

679400E 679600E 679800E 680000E

5540200N

Scale 1:7500 goo o oo

(meters)

Ralmorcl Resources Grasset Project

3—C Borehole Pulse 7v Survey

Boreho e & Loon Location Con

Hole: GR-1 4-2Q Survey Date: February 22, 2014

Crone Geophysics o Exploration Ltd.

5539400N

5540000N

5559800N —

5559600N

679870E,5540041N GR-14-20 5.79718E 1 5539777N

L \\\ tiy f/ l 1?' ? 1' 1 1 M 1 ,\titi----R/ /1 1 l l 1t 1 f?

/ /// 1 l i 1 P 1 // // r I 1 1/ 1

1 1 1 l 1

R// R 1 //// 1 I l P // / P

/ 1 liR 1

RR///' // //

--_-- z-/ z / / i / / / / / / / l 1 7-ff ///4 / / I l 1

R/ / I l 1 -7-7//r/ P

~-~ z- 7Jff R i / / / I l P I7//'Jff I R///// r rI l 1

R/ 1/ / // Jz- ffRR//' / / / / z/'7-ff / 1

/'/ff/R 1 / / % / / l P rf/ffi ///i1I lP

R / ,zfffR//1//// I /f fR~~~~////l

Balmoral Resources

25 0 25 50

Scale 1:2500

G ra sset Project

eters

He e: GR-14-20, LOoD

Survey Date Februory 22 , 2D14

Crone Geophysics & ExRlo rd tion Ltd

200

100

u

100

3—D Q4re'1 o e se EN

Hale Section with rlm a ry

Survey

=re d

— ]

oa

z6

L9

— A

OO

OO

g9

— A

0096L9

-

Aoao6L9

]oa

17

6L

9

Aoa96L9

5540200N —

5540000N —

5539800N —

5539000N 4

5539400N —

5539200N —

Scale 1:10000 100 0 100 200

(meters)

7

Balmoral Resources Grasset project

3—D Borehole pulse -M Survey Boreho e & Loon Location Ma o

ole: GR-14-22 Survey Date: April 2, 2014

Crone Geophysics & Exploration Ltd.

679537E,5540227N 0R-1 4-22

6794D2E,5539955N

~ \ /r1 1 11f1 fi ?f1fi 11 1 911 1f 1P 1 P 1

N %/ /1 1 P 11P 1 f 1 l 1 / 1 1 1 1 1 f i

\\ r0i 1 1 1 1 1 1 1 /1/1T1 1 i 1

Loo ~̀ ~~y~~~~J ~ B /t// î l/ 1~ 1 1 / 1

// 11P1 -~~-~-~ -Y-~ --~~ ~ B B// / l/ 1/ / 1 / I ~y~~~~,- ~~ ~ / B / / / / / / l / / / / 1

~~.~~~~~ ~~ ,7 / B / / / / / / l / 1 / / 1

~~~~~~,-~~7 / / / / / / / / / / 1 / 1 /

,-~~,/ B / / / / / I / / / / / /

_.._,' / / /// /' /////// / I / / /

~ .-----------'.~~~- ~ ~ 7 / B / / / / / / / / I / 1 /

~ /B// / /

/ //l%îl]~ z° / /

~ , / ~ / / / / / / / Î ï l ~ /

z / / / /

/ / 1 / i 1 % % l % / 7/ /f /

/ r/~

B/ / / / / % /

`/îB ////// ~/~ 100z / 7 / / % / / / % /

100

Scale 1,2,500 50 a 50

(mee rs)

BBm o ra l Resources Gresset Project

3—D Bo re nol e u lse E V Survey

Hale 5eoti on with ri mory fl e c

ol e: GR— 1 4-22, Loop 5 Survey Date April 2, 2014

Crane Geophysics 2c Exploraio n L~d ,

— ]

oa

z6

L9

— A

OO

OO

g9

— A

0096L9

-

Aoao6L9

]oa

17

6L

9

Aoa96L9

5540200N —

5540000N —

5539800N —

5539000N 4

5539400N —

5539200N —

Scale 1:10000 100 0 100 200

(meters)

7

Balmoral Resources Grasset project

3—D Borehole pulse -M Survey Boreho e & Loos Location Ma o

ole: GR-14-23 Survey Date: April 2, 2014

Crone Geophysics & Exploration Ltd.

79523E, 554022N GR-14-23

579402E,5539950N

11.

1 1~ 1 f 1 f i ~? f 1 f i 1 1 i I 1 P 1 P 1

1 ï1P /1P1f 1 / 1 1 1 1 1 l' i

1 P 1 / 1 -~-~-~-~--~~» 1///// 1/ 1 1 / 1 / 1

z 1 1 / 1 ~~~~~~~~- B/ / l l l 1/ P f / 1

lllllïi ll ~--~~ B B/// l/ l/ / 1 l

~~~~ / l / Î /

/ / / / / / 1 / / / l /

- ~~~~~~~B/i///Î lÎl1/

B/ 1/ l/ / l l l l l ~ / / Î / l l

/ / / / / î / / / ----- ~ ----- ~- ~- ~ ' ~ B B 1 / / /' / / / 1 / / / ~ ---- ~ ---- ---- ~ ' 7 ~ ~ /' / / /' 1 / / / / / 1 / / / ------ ----- ,-~~~~r~z /rB/111/////Îïll ~_-,-,- - 3 ~ B B 1 1 // B/ B B ~~~,- '~ "~~vBB11 / / / / / / / / /

°_-~,-~ 7- --/-- / z. /' / / /I / 1 / / / / / / / / / ~—' ' ° r 7 f / % / i J /1 / % % % / l / / l l l - -,-~~~ i~~/ z /' /4 /111//4 ////lll ~ ' ' r" 7 / /' / /f//B1////// l l l -'-'~7 7- I/°f/BB%I111 / 1 / / / / l l l � ~ ----- r~ ~/ z'- fB~/4 /1/i//////lll � l ~ ~ ~ 7 /' I / / B / J 1 / 1 / / / / / Î / / /

100 ~~~7 7'7- /J/f /B B / / ///Îlll ~~- ~~ /r z~/ / / /'1 /1 / 1 / / / / / / / / l

200

100

Scale 1,2.500 50 a 50

(mee rs)

BBm o ra l Resources Gresset Project

3—D Bo re nol e u lse E V Survey

Hale 5eoti on with ri mory fl e c

ol e: GR— 1 4-23, Loop 5 Survey Date April 2, 2014

Crane Geophysics 2c Explora~io n L~d ,

— ]

oa

z6

L9

— A

OO

OO

g9

— A

0096L9

-

Aoao6L9

]oa

17

6L

9

Aoa96L9

5540200N —

5540000N —

5539800N —

5539000N 4

5539400N —

5539200N —

Scale 1:10000 100 0 100 200

(meters)

7

Balmoral Resources Grasset project

3—D Borehole aulse -M Survey Boreho e & Loos Location Ma o

ole: GR-14-24 Survey Date: March 31, 2014

Crone Geophysics & Exploration Ltd.

679892E,5539957N G2-19--24

57977CE553967EN

\ ,./.. /i111f1P1f1P111 N.— -r /// 1 1 1 1 1 1 f 1 f 1 f 1

////171111f1f1 / 1 1 1 1 1 1 1 / 1/ 1 1 1 1 1 1

111 11 l 1 / y 1 1 1

/ // l l 1 / 1 1 1 / 1 1

/ / l l 1/ 1 1

/ / /11 1 /

~— ~7- 7 /1 1 //lll1/

7- 7- z/ / / / / 1 / /- / /ïl111

llllll z / /

/ / ~"é.o /4 / / l l l l 1 / / 725 / / // ~îr/~%//1/11

z'

/i/ / //llll ~ /i / /i/ /%llll

/

/ / / //1//1 x /f ~~~~/////1//1

~ / z / ~~~// //////1 ~ /// / /1 / /////llll

/i/,/ / / / /////1 , / /// 1171

/ ////1 /// /1/ // l l l l 1

200

100

0

100

Scale 1 ,2500 25 6 25 55

(meters)

Balm oral Resources

Grasset ro/ect

3—D Bcreho e buse EV Survey

Hole Section ri mort' Fie n

0 e: GR-1 4-2L , Loop 5 Survey Dote: March 51, 2014

Crone Geophysics dc Exploration Lt~,

— ]

oa

z6

L9

— A

OO

OO

g9

— A

0096L9

-

Aoao6L9

]oa

17

6L

9

Aoa96L9

5540200N —

5540000N —

5539800N —

5539000N 4

5539400N —

5539200N —

Scale 1:10000 100 0 100 200

(meters)

7

Balmoral Resources Grasset project

3—D Borehole pulse -M Survey Boreho e & Loos Location Ma o

ole: GR-14-25 Survey Date: April 2, 2014

Crone Geophysics & Exploration Ltd.

679869E,554019,3N GR-14-25

679524E,55,39698N

\ rn \ \ \ \ \„ — / / / \\\\\\\N,--_ —at//

/

//

////

sr// / / /

2 ttt/////

- ~~-t t t / t i' / / / / 77////////

/ t t t t / / / / / /

7/'7/////////

/tttttt////// /ttttt/////// tttt/t/////// ttttt/l'//

Z////////////

/////////////

_t//t/////////

t / / / / / / / / / / / /

Scale 1:5000 100 100

(meters)

Balmoral Resources Grasset Project

O Porch() e se _VI Survey

e Section witn Primary =iele

Hale: 4-25,Loop 5 Survey Date: April 2 , 2014

200

100

0

—100

—200

—300

—400

—500

I 1 P t 11 t t t i iP

iP

iP

1P

iP

iP

iP

iP

iP

t t t t

3—

Ha

Crone Geophysics & Exploration Ltd.

Crone Geophysics & Exploration Ltd.

APPENDIX II

LINEAR (5-AXIS) PULSE EM DATA PROFILES

Geophysical Survey Report

lB

600 650 700 750 800 850 i i i i i i

a~

P-1 ~ a~

ns ~

—1 U a)

~ aJ G E~

g

C.)

ü un

a~O

~ G

~

,-y ü u~ N

—6

G G

~

c‘2 c+.2

co -3

cn

a~O

~ G Ed ~-

U

60.

40. —

20. —

0.

2000. —

1500. —

1000. —

500. —

0. I I I I

1000. —

800. —

600. —

400. —

200. —

0. 19

9

I I I I 10

I I I

20. —

15. —

10. —

5.-

1 1-5 0.

1.-

1-6 0.

—1. —

—2. —

—3. —

Balmoral Resources Grasset Project Loop 2014-1,Line 600E X Component

Crone Geophysics & Exploration Ltd.

550 80.

550 600

650 700 750 800

850

1

1-2

a~

P-1 ~ a~

ns ~

—1 U a)

aJ ~~ G ~

g (0

~

co U un

a~O

~ G

~

,-y ü ~ m m ~

a~ q C ~ G G

0.

—500.

—1000.

—1500.

-2000.

0.

—500.

—1000.

—1500.

—2000.

300.

200.

100.

0.

—100.

—200.

50.

40.

30.

20

10.

1.-

Balmoral Resources Grasset Project Loop 2014-1,Line 600E Z Component

Crone Geophysics & Exploration Ltd.

O. 1

2.-

-

5

—5

— 1

NOE

0 -000 5000. —

-400 -200 200 00 600

—5000.

—10000. —

—15000. —

1000. —

0. ~

—1000. —

—2000. —

~

II

~ s ,

Balmoral Resources Grasset Project Loop 2014-1,Line 700E X Component

Crone Geophysics & Exploration Ltd.

-000 200000. —

-400 -200 0 200 00 600 i i i i i i

ii

100000. —

50000. —

—50000. -

Balmoral Resources Grasset Project Loop 2014-1,Line 700E Z Component

Crone Geophysics & Exploration Ltd.

I I I I I I I I I e iiiiiiiii

~ -100000.

4000.

3000.

co U un

2000.

,~ G7 a) O A E~ 1000. ~ G

~ 0.

80.

60.

40. ~ ^ ü

— a) 20.

G G

v ~ ~

10.

5.-

0.

—5.

—10. —

—15. —

1

i_ I I I I I I I I I I i I I I I inr

100000. —

0.

—100000. —

—200000. —

1111111111111111111

3

••=7 14..

T 20. — ,-y ü

u~ N

0. 1

i2

I I I I 1 1 1 1 1 1 1 1 1 I I 1 1 I

—500. —

—1000.

—1500. —

60. —

40. —

1

~ —20.

6.-

4. —

2. —

—2. —

1000. —

0. i

—1000. —

—2000. —

—10000. —

2000. —

-600 -400 -200 0 200 400 600 500.—

Balmoral Resources Grasset Project Loop 2014-2,Line 100 X Component

Crone Geophysics & Exploration Ltd.

~

~ —20000.-

3000. —

—100000.

60000.

40000.

LC

20000. U

CL)

N \~ G E~ 0.

2000. —

1`—o'1000. —

co ü un

1B

0. g • G

~ —1000. —

50000.

0.

—50000.—

1—+1 11111111 41111

~

111111 1 1

--

3

1 I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I I I I I

120. —

80. —

40. —

0.

1

-600 -400 -200 0 200 400 600 100000. —

Balmoral Resources Grasset Project Loop 2014-2,Line 100 Z Component

Crone Geophysics & Exploration Ltd.

12. —

8.-

4.-

0.

—4. —

Balmoral Resources Grasset Project Loop 2014-2,Line 200 X Component

Crone Geophysics & Exploration Ltd.

a~

1000.

500.

0.

P-1 ~

n:s ~ —500.

—1000.

10000.

5000.

LC

. "-c-̀)

CL) ,T6

g (d

—5000.

~ —10000.

2000.

1000.

co U un

0.

N O A E~ —1000. ~ G

CJ —2000.

-600 —

-400 -200 0 200 400 600 i i i i i i

A .41L r ..

....+7=.~ ~

1

50000. P

0.

—50000.—

—100000. —

1—+1 I I I I I I I I I l I 1 1 I

30000. —

20000. —

10000. —

0.

-10000 —

3000. —

5-

2000. —

—1000. —

150. —

1000. —

~~ •

1 I I 1 1 I I I I I I I I I I I I I I I 1 1

—50. —

0. 1

100.

50. —

-600 100000. —

-400 -200 0 200 400 600 i i i i i i

Balmoral Resources Grasset Project Loop 2014-2,Line 200 Z Component

Crone Geophysics & Exploration Ltd.

1 1 1 1 ~111.•••.--

—1000. —

—2000. —

—3000. —

1000. —

0. ~

—1000. —

—2000. —

10000. —

5000. —

. _ 0 )

Cn ,T6 —5000.

g

~ —10000. —

2000. —

150. —

}3

100. —

T 50.— ,-y ü • N

—6~

C N A G � v ~ ~ —50. —

12. —

8.—

—600 —400 —200 0 200 400 600 loon. -

Balmoral Resources Grasset Project Loop 2014-2,Line 300 X Component

Crone Geophysics & Exploration Ltd.

P-P

50000. g

0.

—50000.—

—100000. —

1-1 1 I 1 I 1 1 I 1 I 1-1-1 1 I I I I I I I

-400 -200 0 200 400 600 i i i i i i

-600 100000. —

Balmoral Resources Grasset Project Loop 2014-2,Line 300 Z Component

Crone Geophysics & Exploration Ltd.

1-e 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

3000. —

2000. —

1000. —

1 0.

200. —

150. —

9 a—~ 1-B~~

40000. —

20000. —

0.

—20000. -

- 40000. —

4000. —

I I I I I I I I I I I I I ~~~..

40. —

T 0.

ü N ~

—40.— G • G

~ —80. —

12. —

8.—

3

1

4.-

-4. —

-600 -400 -200 6000. — I I

4000. —

2000. —

0. ~ I yI I I I~_~ ++~ I I I I I I

0 200 400 600 I I I

—2000. —

10000. —

//)

5000. —

1 _ 0. —1 U

a) ,76 —5000. `

g

~ —10000. —

2000. —

1000. —

—2000. —

9 I I 1 1 I I I I I I I

—1000. —

80. —

Balmoral Resources Grasset Project Loop 2014-2,Line 400 X Component

Crone Geophysics & Exploration Ltd.

4-6 ~

100000. —

a; 50000.

4000. —

2000. — o ~\~ 9

0. 10I I I I I I I I

—2000. —

150. —

100. —

50. —

1-3

0. J~

—50. —

8.-

6.-

4.—

~6

_ -2111=111

2.-

60000. —

40000. —

20000.

0.

—20000.

6000. —

-600 -400 -200 0 200 400 600 150000. —

Balmoral Resources Grasset Project Loop 2014-2,Line 400 Z Component

Crone Geophysics & Exploration Ltd.

a~

3000.

2000.

1000.

P-1 ~ a~

n:s ~ 0.

—1000.

10000.

5000.

1 _ 0. —1 U

a) ,76

g —5000.

~ —10000.

4000.

co U un

2000.

,~ G7

N O A E~ —2000. ~ G

~ —4000.

120.

80.

1

ü

40.

C N 0. A G ~ v ~ —40.

-600 -400 -200 0 200 400 600 — I I I I

1

1 1 1 1 I I I I I I I I I I I I I 1 I I

Balmoral Resources Grasset Project Loop 2014-2,Line 500 X Component

Crone Geophysics & Exploration Ltd.

0 -600 100000. —

-400 -200 200 400 600

50000. n

0.

—50000.—

—100000. —

50000. —

0.~

—50000.-

I I I I I I I I

- 100000. —

—150000. —

6000. —

100.—

T 50.— ,-y ü

u~ N

0. G • G

~ —50. —

12. —

8.—

î-3 1-3

4000. —

2000.

-a

~

0 18

—2000. —

I I I I I I I I I

150. —

Balmoral Resources Grasset Project Loop 2014-2,Line 500 Z Component

Crone Geophysics & Exploration Ltd.

C) -20. -

-600 -400 -200 0 200 400 600

a~

6000.

4000.

2000.

P ü a~

ns ~ 0.

-2000.

10000.

5000.

a)

0.

~ aJ

-5000.

~ -10000.

2000.

1000.

ü un

0.

,~ G7 aJ O A E~ -1000. ~ G

~ -2000.

60.

[n 40.

20.

,-y ü

u~ N

-6 C N

-

7

8-

-

-

-

1-3

e I 4

Balmoral Resources Grasset Project Loop 2014-2,Line 600 X Component

Crone Geophysics & Exploration Ltd.

-600 100000. —

-400 -200 0 200 400 600 i i i i i i

PP

50000. .

0.

—50000.—

—100000. —

1 I I I 1 1111111111 11111111 l 1 I

rr—

60000. —

40000. —

20000. —

0.

—20000.-

6000. —

1 I I 1 1 I I I I I I I I I I I I I I I I

~

50. —

0. 1

—50. —

100. —

1~ 15 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 13

H

4000. —

—2000. —

2000. —

I I I llb 1 1 1 1 1 l:

150. —

ü - ~

Balmoral Resources Grasset Project Loop 2014-2,Line 600 Z Component

Crone Geophysics & Exploration Ltd.

0 200 400 600 I I I

-600 -400 -200 4000. — I I

2000. —

0.

tr —2000. —

—4000. —

3 13 I I I I I I 1 I

T 20.— ,-y ü

u~ N —6 C N 0. 15 i A G � v ~ —20.

2000. —

60. —

40. —

12. —

c‘28.

c\.?

—2000. —

—4000. —

fl .,=iF1

Balmoral Resources Grasset Project Loop 2014-2,Line 700 X Component

Crone Geophysics & Exploration Ltd.

13--

1 1 1 1 I I I I I I I I I I I I I I

100. —

50. —

1-3

I 1- 5 0. 1

—50. —

-400 -200 0 200 400 600 i i i i i i

-600 100000. —

50000. —

..

0. I I I H I i I i I i I i I H i 11111111 i L i i

—50000.-

-100000. —

100000. —

50000. —

—50000.

—100000. —

6000. —

4000. —

2000. — B

0. 10

—2000. —

150. —

12. —

—4. —

8.-

4. -

0. -•x _ ~,~_ ̀=\

Balmoral Resources Grasset Project Loop 2014-2,Line 700 Z Component

Crone Geophysics & Exploration Ltd.

~

i i i i i i I i re i

-8--

0 -400 -200 200 400 600

a~

2000.

1000.

0.

P ü a~

n:s ~ —1000.

—2000.

10000.

5000.

LC

0. 7)̀

CL) ,76

g —5000.

~ —10000.

2000.

co U un

1000.

N O A E~ — 1000. ~ G

~ —2000.

-600 —

-8

PI

6.-

4.-

2.-

/~_,.~~~ ~.

0

—2. —

Balmoral Resources Grasset Project Loop 2014-2,Line 800 X Component

Crone Geophysics & Exploration Ltd.

FP- 1 1 I 1 I I

50000.

0.

- 50000.-

-100000. -

1 I I I 1 1111111111 I I I I I I I I J41, ! I

e

1e

2000.

-2000. -

1~~

I I I I I 1 1 1 1 11-6 1 1 I 1 I 1 1 F--r--1*-t--- I I 1 r 1

I Ar ~=

-

I l

i ►̀- '~ - I =_ - .o

_,

-400 -200 0 200 400 600 i i i i i i

-600 100000. -

60000.

40000.

20000.

0.

- 20000.

6000. -

4000. -

150. -

100. -

T 50.- ,-y ü

u~ N 0, 1

A G � v

~ -50. -

6. —

4.—

Balmoral Resources Grasset Project Loop 2014-2,Line 800 Z Component

Crone Geophysics & Exploration Ltd.

2.-

5 —4- I I I I I I I I T I

12

-2. -

1-3

34

—8

1000. —

0.

—1000. —

—2000.

40. —

20. —

3

—20. —

~—

I I I I I I I III III i i I

—1000.

—2000.

60. —

0 .

1000.

-600 -400 -200 0 200 400 600 2000.

Balmoral Resources Grasset Project Loop 2014-2,Line 900 X Component

Crone Geophysics & Exploration Ltd.

100000. —

50000. —

0.

—50000.-

I I I I I I I I I I I I I

-400 -200 0 200 400 600 i i i i i i

—50000.-

6000. —

4000. —

Cn ~ aJ

g G E~

0,

150000.

100000.

50000.

C.)

2000. —

—2000. —

150. —

100. —

50. —

—50. —

6.-

3

4. -

2.—

~1

—2. —

Balmoral Resources G Vsset Project Loop 2014-2,Line 900 Z Component

Crone Geophysics & Exploration Ltd.

-600 150000. —

--- ..

~~

- 500. -

- 1000. -

-400 -200

0

200 00 200.-

0 .

- 200. -

- 400. -

-600.

3000. -

2000. -

1000. -

0.

- 1000. -

- 2000. -

1000. -

500. -

40. -

u•-)20. -

1-3

2.

1 .

6

r

I''I`~I'":~' I ~ I~r~I•

Balmoral Resources Grasset Project Loop 2014-3, Line 100E X Component

Crone Geophysics & Exploration Ltd.

0 200 00

0.

20000. —

15000. —

-200 ['P I

~ ~

-400 20000. —

15000. —

10000. —

5000. —

~ 10000. — 1

2— Z „ 5000. —

FG' 5-

0 . I I I I I I I I I I I I I

2500. —

7

2000. —

1500. —

1000. —

500. —

10

I I I I I I I I I I I I I I I I

150. —

100. —

50. —

-------~

0.

1

B— a

13

6.-

4.-

17- ---------

.: CM=~--

—2. —

2.-

Balmoral Resources Grasset Project Loop 2014-3, Line 100E Z Component

Crone Geophysics & Exploration Ltd.

~ ~ —1000. —

3000. —

2000. —

1000. —

0.

—1000. —

—2000.

1500. —

1000. —

Balmoral Resources Grasset Project Loop 2014-3, Line 200E X Component

Crone Geophysics & Exploration Ltd.

I I I I I I I I I I I I I I I I I

20000.-

15000 —

10000.

Cn Z „ 5000

g `.

~ 0.

4

-400 -200

0

200 00 20000.-

15000.-

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

10000 —

5000. —

0.

2500. —

2000.

1500. -

1000. -

500. —

-6-

1

0. I 1 I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I I

150. —

100.-

-----1ti 50 —

18

0. 1

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

—50. —

1?f

Balmoral Resources Grasset Project Loop 2014-3, Line 200E Z Component

Crone Geophysics & Exploration Ltd.

0 -400 200. —

200 00 -200

t

8

—1000. —

—2000. —

100. —

0.

—100. —

—200. —

—300. — •

2000. —

1000. —

Balmoral Resources Grasset Project Loop 2014-3, Line 300E X Component

Crone Geophysics & Exploration Ltd.

0 200 00

10000. —

5000. —

0.

10000. -

8000 —

L.0 6000.

4000.

~O ~ p 2000. —

~ ~

4

0. I I I i i I i i i i

2500. —

2000. —

1500. —

1000. —

500. — 9 0

9

0. 200. —

150. —

~ 1~

0.

1e

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

1-1 ~3

1-1

50. —

~ 1-4

0.

6.-

4.

2.—

-400 -200 20000. —

15000. —

pp

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

0 200 00 -400 -200 200.-

100. —

O.

—100.

—200.

—300. —

'4'4•~11111I

2000. —

1000. —

0

—1000. —

—2000. —

Balmoral Resources Grasset Project Loop 2014-3, Line 400E X Component

Crone Geophysics & Exploration Ltd.

0

I 1 1 I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I

-400 -200 20000.-

15000.-

10000

5000.-

20000.-

15000 —

200 00

P

0.

200. —

150.

100. —

0.

6.-

4.-

2 —

ri

Ti

I _ 10000.

a)

,76 5000.-

0.

5-

I I I

4000. —

3000.

2000.

1000. —

0. I I I I I I I I I I I I I

—2. —

Balmoral Resources Grasset Project Loop 2014-3, Line 400E Z Component

Crone Geophysics & Exploration Ltd.

~

II

- 100.

- 200.

—1 -3 a) Z „ g (0 —

~

co U

un ~ ~

~ G

CJ

ü

G G ~ v

U

-300.

4000.

2000.

0.

-2000.

-4000.

1500.

1000.

500.

0.

-500.

-1000.

40.

20.

-20.

-40.

-

• e

-

-

~ ^ .

~

-

-

-

-400 -200 100.

0 200 00

2.-

1.-

1s

0

Rwann•---=7,

I - 1

v

—1. -

-2. -

Balmoral Resources Grasset Project Loop 2014-3, Line 500E X Component

Crone Geophysics & Exploration Ltd.

2000.-

1000 —

4.—

2.-

-400 -200

0

200 00 20000.-

15000.-

10000

PP

5000. —

0.

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

10000.-

8000. —

6000.- 1

a) 4000.

rn ~ 711) ,,r„

~ p 2000.—

I I I I I I I I I I I I I I I I

4000. —

3000. —

a-

B 1fi 1-~ 10

0. I I I I I I I I I I I I I I I I

200. —

150. —

I 1-1

T 100. — ,-y

~ 'ro) 1 ~ r~

12- 6 50.—

q G 1a 10 1-3 ~v 4 14— 14

0. 15

I I I I I 1 I I I I 115

I I I I 115

I I

6.-

0.

—2. —

0. 'r'grr c

Balmoral Resources Grasset Project Loop 2014-3, Line 500E Z Component

Crone Geophysics & Exploration Ltd.

0 200 00 -200

a~

200.

100.

0.

P-1 ~ a~

ccS ~ —100.

—200.

4000.

2000.

I _ a)

.

,76

g —2000.

~ —4000.

2000.

co U un

1000.

,~ G7

N O A E~ —1000.

~ —2000.

40.

20.

ü

0.

~ V)

—20. G G ~ v

~ —40.

-400 —

2

1

NMI

W. .,

~

Balmoral Resources Grasset Project Loop 2014-3, Line 600E X Component

Crone Geophysics & Exploration Ltd.

150. —

H

100. —

50.-

13

0.

200. —

-400 -200

0

200 00 20000.-

15000.-

10000

5000.-

10000.-

8000.-

6000.-

-4—

-5

5

4000.-5

2000. —

0.

I I I I I I I I I I I I I I H

4000. —

3000.

2000. —

—7

1000. —

10

0.

i I I I I I I I I I I I I I I I I I I I I I I I I I I

Balmoral Resources Grasset Project Loop 2014-3, Line 600E Z Component

Crone Geophysics & Exploration Ltd.

0 200 00 -400 -200 200.-

—2000

2000. —

0 .

—4000. —

1 ~

—1000. —

—2000. —

100. —

0.

—100. —

—200. —

—300. —

4000. —

2000. —

1000. —

Balmoral Resources Grasset Project Loop 2014-3, Line 700E X Component

Crone Geophysics & Exploration Ltd.

P

0 -200 200

-PP

0.

200. —

B 1❑ 10 10 I I I I I I I I I I I I I I I I

10000.-

8000.—

Ln 6000.- 1

4000.—

~ ~

j

p 2000. —

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

~

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

00

4000. —

3000. —

2000.

1000. — 8

-9 9-

0.

50.- 13

1,5

1B _

H H ~ 150.-

100 —

0.

0.

-400 10000.-

8000 —

6000. —

4000. —

2000. —

0 -400 200. —

200 00 -200

11—

20. —

—20. —

—40. —

100. —

0.

—100. —

—200. —

—300. —

4000. —

2000. —

L.0

I _ 0.

r G ~ —2000.

g

~ —4000. —

2000. —

40. —

1000. —

0. 1

—1000. —

—2000. —

Balmoral Resources Grasset Project Loop 2014-3, Line 800E X Component

Crone Geophysics & Exploration Ltd.

13

150.

100. -

50. -

0.

6.-

H

8000. -

6000. -

4000. -

2000. -

0.

10000. -

8000. -

Ln 6000.

4000. -5' ~

~~ ~ p 2000. -

~ ~

4000. -

a

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0.

3000.

Balmoral Resources Grasset Project Loop 2014-3, Line 800E Z Component

Crone Geophysics & Exploration Ltd.

2000. -

1000. -

0.

200. -

6

-2. -

4.-

2.-

0.

_ ra 18 ~~

16

2: yx.. 6 A;mww=mhs.—~m

~

-a

0

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

0 -400 200. -

200 00 -200

3000. -

2000. -

L.0 1000. - I

0.

N \~ g • p -1000.- co

- 2000.

2000. -

r?~

- 1000. -

- 2000. -

40. -

100. -

0.

-100. -

-200.

-300. -

20. -

0.

- 20. -

- 40. -

• ~i~ro--"A wi. ~s ~ -n~u~~• ~n~ . ~:r ~rc.air ~~~

Balmoral Resources Grasset Project Loop 2014-3, Line 900E X Component

Crone Geophysics & Exploration Ltd.

1000. -

0.

200. —

B 10 1~ 10 I I I I I I I I I I I I I I I I

0.

5 5________

-a 1000 —

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

r

0.

4000. —

3000. —

2000.-

9-

13 11 ~1

150. —

100. —

50. —

14 14 15

15 . 15 1

—50.-

6.-

19

4.-

2 —

1

8000.—

Ln 6000 —1

~ 4000. m ~ 76-,r„

~ p 2000.— (0

~

200 00 0 -200

~

-400 20000. —

15000.-

10000 —

5000. —

-400

-200

0

200 00 100. -

I " I I I I I I I I 0.

—100. —

—200. —

—300. —

3000.

2000.

1000.

0.

—1000.

—2000.

~—~

~

1500. —

1000. —

500. —

0. 1

—500. —

—1000. —

1~—

40. —

20. —

—20. —

—40. —

Balmoral Resources Grasset Project Loop 2014-3, Line 1000E X Component

Crone Geophysics & Exploration Ltd.

12 1-2 1-2

11 n f3 1-1 150 —

—50.-

100. —

50. —

15 15 1-4

0. 15 1-5

-400 -200

0

200 00 20000.-

15000.— .

a~ 10000. —

P ~ a) [()

5000.—

E,

P, 0.

20000.-

15000 —

I _ 10000. -~- 1 2

cn ci.) ~ r

G ~ 5000. —

g 5-

0. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

4000. —

3000. —

P

2000.-

1000

8- ° 8

0.

200. —

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

6.-

4.-

~l 6

2 —

0.

—2. —

Balmoral Resources Grasset Project Loop 2014-3, Line 1000E Z Component

Crone Geophysics & Exploration Ltd.

1500. —

1000. —

500. —

0 1

—500. —

—1000. —

a

40. —

20. —

—20. —

—40. —

Balmoral Resources Grasset Project Loop 2014-3, Line 1100E X Component

Crone Geophysics & Exploration Ltd.

2500. —

2000. -

1500. -

1000. - a

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

~i

0 —200 —400 25000. —

20000.

15000. —

10000. —

5000. —

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

ma)

G ~ 5000. g g (0 `--'

~ 0.

L.0

0.

20000.-

15000 —

10000.—

3—

200 00

2

—50.-

1.6 1

6.-

6 4.-

2

-01

500 —

1

0.

150. —

100.-

1500.

1000. —

500. —

0.

1000. —

800. -

10000.-

8000.

6000.-

4000.-

2000 —

0. I I I I I I I I I I I I

8

600. -

400. -

200.-

0. I I I I I I I I I I I I I I I

20. —

5.— ~

t~~

-300 2000. —

-200 -100 0 100 200 300 i i i i i i

Balmoral Resources Grasset Project Loop 2014-4BF(Butterfly), Line 900E X Component

Crone Geophysics & Exploration Ltd.

-300 40000. —

-200 -100 0 100 200 300 I I I I I I

20000. —

0.

—20000.-

-40000. —

—60000.-

1 I I 1 1 I I I I ~

II

8000. —

6000. —

4000. —

2000.

0.

1 1 1

—2000. —

1500. —

1000.

500.

0. 141

—500. —

15. —

10. —

5.-

13

0. 1

1

~

—5. —

. ~1,~ ~ I ~ I•'

1.-

- 1. —

—2. —

—3. —

Balmoral Resources Grasset Project Loop 2014-4BF(Butterfly), Line 000E Z Component

Crone Geophysics & Exploration Ltd.

40000.

30000.

20000.

10000.

0.

20000. —

15000. —

I _ 10000. —

cn „ 5000.

g

~ O.

2500. —

2000. —

1500. —

1000. —

500. —

0.

100. —

0.

—100. —

—200. —

—300. —

3

100 50000. —

150 200 250 .

Balmoral Resources Grasset Project Loop 1, Hole GR-14-16 Z Component

Crone Geophysics & Exploration Ltd.

100. —

15

150. —

50.

0.

5 ~ •' ~--~i 'i1' 1

250. —

200. —

25.-

20.-

I I I I I I I I I I I I I I I I I I I

5- ~

0 ~ ~ ~

15-

10- •

0.

—2000.

—4000.

—6000. —

2000. —

1000. —

Ln 0.

-1000.- cn ~ 71.) ,,r„ g p —2000.—

—3000. —

100 2000. —

150 200 250 .

Balmoral Resources Grasset Project

Loop 1, Hole GR-14-16 X Component

Crone Geophysics & Exploration Ltd.

100 150 200 250

iiiili 1-1 iiiiiiliiii 1-1 iiiliiiiiiii

a)

P-1 ~ a)

a5 E

~ ~

LC

~~ aJ G E~

g

C.)

co U un

a)O

~ G

~

0.

—2000.

—4000.

—6000.

—8000.

—10000.

0.

—2000.

—4000.

—6000.

—8000.

400.

200.

0.

—200.

—400.

—600.

1

Balmoral Resources Grasset Project Loop 1, Hole GR-14-16 Y Component

Crone Geophysics & Exploration Ltd.

0.

25000.

20000.

L.o 15000. 1

rn 10000.

~~~

~ p 5000.

~ 0.

10000.

5000.

co 2"-a un

D.

g —5000.

~ —10000.

10000.

-

I I I I I I I I I I I

ü

—5000. — G ~ v

~ —10000. —

3000. —

2000. —

1000. —

—1000. —

100 40000. —

120 140 160 180 200 i i i i i

220 240

DID

30000.

20000.

10000. —

Balmoral Resources Grasset Loop 1, Hole GR-14-17 Z Component

Crone Geophysics & Exploration Ltd.

120 140 160 180 200 220 240 i i i i i i i

100 20000. —

15000.

10000.

5000.

5000. —

0.

11111111 1-1 15000. —

10000. —

—5000. —

400. —

200. —

0.

—200. —

—400. —

—600. —

0.

Balmoral Resources Grasset Loop 1, Hole GR-14-17 X Component

Crone Geophysics & Exploration Ltd.

20000.

15000.

10000.

5000.

0.

- 5000.

I I I I I I I I I I I I I I I

20000. -

15000. -

L.0 10000. - 1

5000. - cn ~ O~ • E- • g Ea• ~ ~

8000.

6000.

4000.

2000.

0 .

- 2000.

2000. -

1500. -

1000. -

500. -

0.

-500. -

5000. -

5000. -

0.

-5000. -

a\V

100 15000. -

~

10000. -

120 140 160 180 200 220 240 i i i i i i i

Balmoral Resources Grasset Loop 1, Hole GR-14-17 Y Component

Crone Geophysics & Exploration Ltd.

5-

15000. — 1

10000. — Cn ~ ~~ g • p 5000. -5 Ea

~

6

0.

3000. —

2000. —

1000. —

—1000. —

—2000.

500.

I I I I I I I I I

25000. —

20000. —

0 . 1 I

—500.

—1000.

—1500.

100. —

co —100.

a) v?

• ~ —200. � G --

~ —300.

30000.

20000.

10000. —

0.

80 40000. —

100 120 140 160 180 200 i i i i i i

Balmoral Resources Grasset Project Loop 1, Hole GR-14-18 Z Component

Crone Geophysics & Exploration Ltd.

4.1 0.

- 100. -

- 200. -

- 300. -

-400. -

1~~

a)

P-1 ~ a)

ns ~

LC

U a)

7.)1 G E~

g C.)

10000.

8000.

6000.

4000.

2000.

0.

8000.

6000.

4000.

2000.

0.

-2000.

1000.

80 -

100 120 140 160 180 200 i i i i i i

-

-

~2

6

- 1000. -

- 2000. -

- 3000. -

500. -

0. 15

-500. -

-1000. -

-1500.-

- 2000. -

100. -

Balmoral Resources Grasset Project Loop 1, Hole GR-14-18 X Component

Crone Geophysics & Exploration Ltd.

4—

a)

20000.

15000.

10000.

P-1 ~ a)

ns ~ 5000.

0.

10000.

8000.

L.0 6000.

4000.

~O~

~ p 2000.

~ ~ 0.

2500.

2000.

co U un

a)O

1500.

1000.

~ G 500.

0.

1500.

1000.

500. ,-y

u~ N ~ a)

0 G G ~ v

C)

c‘2 c+.2

~

cn

—500.

200.

150.

100.

50.

~ G 0

—50.

100 120 140 160 180 200 i i i i i i

I I I I I I I I I

Balmoral Resources Grasset Project Loop 1, Hole GR-14-18 Y Component

Crone Geophysics & Exploration Ltd.

80 —

80 90 100 110 120 130 1L0 150 50000. —

40000.

30000.

20000. —

10000. —

0.

40000. —

30000. —

20000. —

10000. —

0.

3000. —

2000. —

1000. —

0.

—1000. —

200. —

-1k Air

0 ' 1

T —200. — ,-y ü

u~ N

—400. G • G

~ —600.

0.

—20.

—40. —

—60. —

—60. —

—100. —

Balmoral Resources Grasset Project Loop 1, Hole GR-14-19 Z Component

Crone Geophysics & Exploration Ltd.

~ 0 .

—20. —

—40. —

—60. —

~ \\

10000. —

5000. —

0.

—5000. —

2000. —

0.

—2000. —

—4000. —

40. —

20. —

—10000. —

4000. —

80 100 120 1L0 160 15000. — ~

DID

Balmoral Resources Grasset Project Loop 1, Hole GR-14-19 X Component

Crone Geophysics & Exploration Ltd.

~ U -20.

80 100 120 1L0 160 — ~

a~

P-1 ~ a~

I _

Z ~

g g

co U un

N O

CJ

,-y ü

u~ N ~ V)

A G

~ v ~

c‘2 c+.2

co

cn

~ G

10000.

8000.

6000.

4000.

2000.

0.

8000.

6000.

4000.

2000.

0.

3000.

2000.

1000.

—1000.

400.

300.

200.

100.

0.

80.

60.

40.

20.

0

/^\

Balmoral Resources Grasset Project Loop 1, Hole GR-14-19 Y Component

Crone Geophysics & Exploration Ltd.

30000.

20000.

10000.-

I i i i i i i i i i i i i i I

~ ,~

8000 —

6000. —

4000. —

2000. —

6

200. —

40000.-

30000

20000.-

10000. -

100 40000. —

125 150 175 200 225 250 275

. i .

Balmoral Resources Grasset Project Loop 1, Hole GR-14-20 Z Component

Crone Geophysics & Exploration Ltd.

2000. —

1000. —

0.

—1000. —

—2000. —

125 150 175 200 225 250 275 i i i i i i i 15000. —

s— .q

4000. —

2000. —

0. i

—2000. —

—4000. —

10000. —

5000. —

I i I I I I i i i i ▪ i i i PP

—5000.

0.

Balmoral Resources Grasset Project Loop 1, Hole GR-14-20 X Component

Crone Geophysics & Exploration Ltd.

a)

a)

4000.

3000.

2000.

ns ~ 1000.

0.

8000.

6000.

4000. 1

a)2000.

7)1 ~

p 0.

~ — 2000.

6000.

4000.

co U un a) O

2000.

~ —2000.

3000.

2000.

1000.

,-y ü

u~ N ~ a)

0.

~ v ~ —1000.

4 rill"

.ti ~ A`.•a

Balmoral Resources Grasset Project Loop 1, Hole GR-14-20 Y Component

Crone Geophysics & Exploration Ltd.

225 250 275 125 150 175 200

ap

I I I I I I I I I I I I I I I I I I I I I I I

40000. —

30000. —

20000. —

10000. —

150 175 200 225 250 275 .

0.

Balmoral Resources Grasset Project Loop 1,Hole GR-14-20 (Fluxgate) Z Component

Crone Geophysics & Exploration Ltd.

~

-a-, ~

15000.

10000.

5000.

I P-1

O —5000.

8000.

4000.

ct)

0 .

73-1.) —4000.

~ —8000.

8000.

4000.

0.

~

—4000.

~ —8000.

4000.

co

c,D

r.Q a~..

E-

2000.

—2000. G ~

~ —4000.

10 —

— •

125 150 175 200 225 250 275 i i i.

i

-- ~

1

Balmoral Resources Grasset Project Loop 1,Hole GR-14-20 (Fluxgate) X Component

Crone Geophysics & Exploration Ltd.

6000.—

PP 4000. —

2000. —

0. I

8000. —

6000. —

4000. —

2000. —

1 : - = -

-2000. —

400. —

200. -

~

p ~ -200.—

Ed ~-

~ —400.-

100 125 150 175 200 225 250 275 8000.-

Balmoral Resources Grasset Project Loop 1,Hole GR-14-20 (Fluxgate) Y Component

Crone Geophysics & Exploration Ltd.

20000 —

15000. —

10000. —

5000. —

0. I i i i i i i i i i i

5- —8- -----

3-2

20000.-

15000 —

"-c-̀) 10000. —

CL) ,T6 5000.-

0.

---------

4000. —

2000. —

0.

—2000. —

—4000.-

~~:

-500 —

—1000.-

- 1500.—

150 175 200 225 250 275 300 325 25000.-

Balmoral Resources Grasset Project Loop 5, Hole GR-14-22 Z Component

Crone Geophysics & Exploration Ltd.

150 175 200 225 250 2000. — i i i i

a)

0.

—2000.

P-1 ~ a)

ns ~ —4000.

—6000.

2000. —

—2000. —1 U

aJ ~

g —4000.

~ —6000. —

4000. —

2000. — ~

~ U un a) O A E~ —2000. — ~ G

~ —4000. —

1500. —

co 1000. —

500. — ,-y ü

u~ N

a) 0.

G G ~ v

C) —500. —

60. —

40. — '7? ~

20. —

0.

Ed

z) —20. —

275 300 i i

4111111 Itaiks ~3~

Balmoral Resources Grasset Project Loop 5, Hole GR-14-22 X Component

Crone Geophysics & Exploration Ltd.

2000. —

1000. — co

,-y ü

u~ N

a)

G G ~ v

C)

'7? c+.2

"75.

— a) ~

~ G

z)

—1000.

—2000.

100.

50.

0.

—50.

—100.

Balmoral Resources Grasset Project Loop 5, Hole GR-14-22 Y Component

Crone Geophysics & Exploration Ltd.

rt

150

a)

P-1 ~ a)

F, \ ns ~

co

cn ~~~

p Ed

0.

—2000.

—4000.

—6000.

—8000.

10000.

5000.

0.

—5000.

— 10000.

—15000.

10000.

175 200 225 250 275 300 i I I III I III I I ~

~

2000. —

1500. —

1000. —

500. 11

lz

0.

—500. —

EMa

20000. —

15000. —

10000. —

5000. —

180 200 220 240 260 280 300 320 i i i i i

0.

20000. —

15000. —

co

10000.

cn Z „ 5000.

~ ~

~ O.

z ti

200. —

100. —

15

—100. —

—200. —

Balmoral Resources Grasset Project Loop 5, Hole GR-14-23 Z Component

Crone Geophysics & Exploration Ltd.

180 200 220 240 260 280 300 320 0. 1 1 1 1 1

—1000. -

—2000. —

—3000. —

—4000. —

~ —

2000. —

1000. —

0.

z _

—1000. —~

—2000. —

~

1500. —

1000. —

500. —

0.

/7/

1&-

- 500. —

400. —

200. —

0

15

—200. —

—400. —

~—

Balmoral Resources Grasset Project Loop 5, Hole GR-14-23 X Component

Crone Geophysics & Exploration Ltd.

~

II

180 200 220 240 260 280 300 320 I I I I I I I I I I I o.

- 1000. -

- 2000. -

- 3000. -

-4000. -

-5000.

1000.

0.

co -1000. 1

cn ~ -2000.

71.) ,,r„ p -3000.

Ea

~ -4000.

co

i 300. -

c -D

~ 200. -

a~q � p 100. � -- ~ 0.

25. -

20. -

15. -

10. -

5.- 2

0.

I I I

Balmoral Resources Grasset Project Loop 5, Hole GR-14-23 Y Component

Crone Geophysics & Exploration Ltd.

30000. —

r

20000. —

10000. —

0.

20000. —

15000. —

co

-3 10000. —

—1 a)

,76 5000.

g

~ 0.

I I I I I I I I I I I I I I I I 1-1+1

—6- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

4000. —

3000. —

2000. —

1000. —

0.

—1000. —

~

7

'7? c+.2

- (r) O

400.

300.

200.

100.

100

150 200 250 300 40000. — • .

Balmoral Resources Grasset Project Loop 5, Hole GR-14-24 Z Component

Crone Geophysics & Exploration Ltd.

100 - I

150 200 250 300

a~

P-1 ~ a~

co

-1 U a)

~ aJ G E~

g

~

cN2

~ U un

-a-1) O ~ G

~

co

,-y ü u~ N

C)

'7? ~

"--6"

a~O ~ G

z)

15000.

10000.

5000.

0.

-5000.

10000.

5000.

0.

-5000.

-10000.

3000.

2000.

1000.

0.

-1000.

-2000.

2000.

1500.

1000.

500.

0.

-500.

100.

0.

-100.

-200.

-300.

-400.

-

- ~

-

-

-

-

-

-

Balmoral Resources Grasset Project Loop 5, Hole GR-14-24 X Component

Crone Geophysics & Exploration Ltd.

-

a)

P-1 ~ a)

O ns ~

co

1

cn ~ ~O g p

l0000.

8000.

6000.

4000.

2000.

0.

10000.

8000.

6000.

4000.

2000.

~ ~

100

150 200 250 300 -

-

8000. -

6000. -

4000. -

2000. -

2000. -

1500. -

1000. -

500. -

300. -

200. -

100. -

0.

e

-100. -

Balmoral Resources Grasset Project Loop 5, Hole GR-14-24 Y Component

Crone Geophysics & Exploration Ltd.

100 25000. .. I

200 300 400 500 .i . i.

20000.

15000.

10000.

5000.

0. IIIIIIIIIIIIIIII I I 1 11111 IIIIIIIIIIIIII

4

20000. —

15000. —

10000. —

5000. —

0. 111 11~1111~ IIIIIIIII H IIIII I HH 1 I I 1 1— I 1 1 1 H IIIIIIIII H IIIIIIIIII

Balmoral Resources Grasset Project Loop 5, Hole GR-14-25 Z Component

Crone Geophysics & Exploration Ltd.

0

—500.

1111

1 ~

• Ilm • 4e`-~~, ÿ~~ ■~~,..

5000. —

4000. —

3000. —

2000. —

1000. —

0.

1500. —

1000. —

500.

100 15000. —

200 300 400 500 . .

0.

—5000. —

5000. —

I I I I I I I

Pp

I I I I I I I I I I i i i I I I I I I I I I I I I I I I I I I I I I I I

10000. —

15000. —

10000. —

5000. —

~~ __ 0. .. .. ~~s. ~` —~.,~'~--- — w. _.,....—,_,:v — ~ ~~

—5000.

1500.

1000.

500.

0.

—500.

—1000.

150.

100.

50.

0.

—50.

—100.

Balmoral Resources Grasset Project Loop 5, Hole GR-14-25 X Component

Crone Geophysics & Exploration Ltd.

1\...71\H.1

1 00 200 300 400 500 4000. — • . . I

0.

—1000.

3000. —

a)2000. —

P ~ 1000.— IN

Balmoral Resources Grasset Project Loop 5, Hole GR-14-25 Y Component

Crone Geophysics & Exploration Ltd.

8000.

6000.

co 4000.

CL)2000.

7.)1 ~

p .

~ —2000.

200. —

100. —

0.

—100. —

—200. —

—50.

cn

p ~ -100. ~ G Ed ~-

~ —150.

"

—300.

50.

Crone Geophysics & Exploration Ltd.

APPENDIX III

PULSE EM DATA PROFILES (LIN-LOG SCALE)

Geophysical Survey Report

lB

550 600 650 700 750 800 850 i i i i i i i

0 ~ 0

11

1-i

1~-

t2

12 1-2-

0

o 0 o-

Balmoral Resources Grasset Project Loop 2014-1,Line 600E X Component

Crone Geophysics & Exploration Ltd.

550 600 650 700 750 800 850 i i i i i i i

0 0 ~

o o-

1E1

11-

12

2

1I

~~

Balmoral Resources Grasset Project Loop 2014-1,Line 600E Z Component

Crone Geophysics & Exploration Ltd.

-600 -400 -200 0 200 00 600 i i i i

âlmoral Resources Grasset Project Loop 2014-1,Line 700E X Component

Crone Geophysics & Exploration Ltd.

i

0 200 00 600 i i

-000 -400 -200 i i

Balmoral Resources Grasset Project Loop 2014-1,Line 700E Z Component

Crone Geophysics & Exploration Ltd.

i

-600 -400 -200 0 200 400 600 i i i i i i i

0 0 o 0

0 0 0

s ~9

14

001111k111-11 .

14040

0

o 0 0

Balmoral Resources Grasset Project Loop 2014-2,Line 100 X Component

Crone Geophysics & Exploration Ltd.

o 0

0 0 0 Q ,-~

200 400 600 -600 -400 -200

Balmoral Resources Gr

Loop 2014-2,Line 100 Crone Geophysics & Expl

..s: Project fornponent

.ration Ltd.

-600 -400 -200 0 200 400 600 i i i i

i Balmoral Resources Grasset Project Loop 2014-2,Line 200 X Component

Crone Geophysics & Exploration Ltd.

200 400 600 -200 -400 -600

~

0

_~J

0 0 0 Q

Balmoral Resources Gri sse Project Loop 2014-2,Line 200 •mponent

Crone Geophysics & Exploration Ltd.

0 O

Q ~ o—

-600 -400 -200 0 200 400 600 i i i i

i Balmoral Resources Grasset Project Loop 2014-2,Line 300 X Component

Crone Geophysics & Exploration Ltd.

-600 -400 -200 0 200 400 600

0 0— ~~

0 0

ô

O 0 0 Q

Balmoral Resources

Loop 2014-2,Line 300

Crone Geophysics & Expl

Project

mponent

tion Ltd.

-600 -400 -200 0 200 400 600 i i i i

0 0 .,-1 ~~ — 1-9-

\

4

Balmoral Resources Grasset Project Loop 2014-2,Line 400 X Component

Crone Geophysics & Exploration Ltd.

i

200 400 600 -600 -400 -200

.. • ~~.. -- - - --- _ ------ -_-- - -

Balmoral Resources Gra -et "roject Loop 2014-2,Line 400 Z •mponent

Crone Geophysics & Explo tion Ltd.

0 0 o- 0

Q 0 ~

o 0-

11

~ 1 \

0

0

o 0 0

-600 -400 200 0 200 400 600

Balmoral Resources Grasset Project Loop 2014-2,Line 500 X Component

Crone Geophysics & Exploration Ltd.

-600 -400 -200 0 200 400 600

Balmoral Resources G Loop 2014-2,Line 500

Crone Geophysics & Expl

roject

ponent

tion Ltd.

-600 -400 -200 0 200 400 600 i i i i

i Balmoral Resources Grasset Project Loop 2014-2,Line 600 X Component

Crone Geophysics & Exploration Ltd.

-600 -400 -200 0 200 400 600 i i i i

J__

Balmoral Resources Gra Loop 2014-2,Line 600 Z

Crone Geophysics & Explo

roject

ponent

ion Ltd.

-600 -400 -200 0 200 400 600 i i i i

i Balmoral Resources Grasset Project Loop 2014-2,Line 700 X Component

Crone Geophysics & Exploration Ltd.

-600 -400 -200 200 400 600

Balmoral Resources Gra Loop 2014-2,Line 700 Z

Crone Geophysics & Explo

se roject

ponent

ion Ltd.

-600 -400 -200 0 200 400 600 i i i i

i Balmoral Resources Grasset Project Loop 2014-2,Line 800 X Component

Crone Geophysics & Exploration Ltd.

~J-

-600 -400 -200 200 400 600

Balmoral Resources Gra Loop 2014-2,Line 800 Z

Crone Geophysics & Explo

t .project

o ponent

a ion Ltd.

-600 -400 -200 0 200 400 600 i i i i

i Balmoral Resources Grasset Project Loop 2014-2,Line 900 X Component

Crone Geophysics & Exploration Ltd.

-600 -400 -200 200 400 600

Balmoral Resources Gras' Loop 2014-2,Line 900 Z C

Crone Geophysics & Explora

roject

panent

on Ltd.

-400 -200

0

200

L00

I Balmoral Resources Grasset Project

Loop 2014-3, Line 100E X Component Crone Geophysics & Exploration Ltd.

-5 5--

0 200 00 -400 -200

o~ 1

2 2 1-2 1-2 12 1-2-

13 r3 13

1& 14 ~ ~

15 0 -115 15~

2

1 4

-6 6 -C 5 - -

7

~~

r6 17 17 37 17

O

Balmoral Resources Grasset Project Loop 2014-3, Line 100E Z Component

Crone Geophysics & Exploration Ltd.

-400

-200

0

200

L00

i Balmoral Resources Grasset Project Loop 2014-3, Line 200E X Component

Crone Geophysics & Exploration Ltd.

0 200 L00 -400 -200

2

0 0 o 0 1--- 2

e 6

10 3a

~

10-

9

10

H 11 H -1i

12 1-2 12

4 14 1.4

34 ------_____

1-7 -17 16 10 16

17 17 17-

3

o 0 o-

Balmoral Resources Grasset Project Loop 2014-3, Line 200E Z Component

Crone Geophysics & Exploration Ltd.

-400

-200

0

200

L00

i Balmoral Resources Grasset Project Loop 2014-3, Line 300E X Component

Crone Geophysics & Exploration Ltd.

0 200 00 -400 -200

7

O

~ 6 -6

10 1-e 10

11 H

13 1-3

12

13 1-3

4 14 14

0~

5

7

Balmoral Resources Grasset Project

Loop 2014-3, Line 300E Z Component

Crone Geophysics & Exploration Ltd.

-400

-200

0

200

L00

i Balmoral Resources Grasset Project Loop 2014-3, Line 400E X Component

Crone Geophysics & Exploration Ltd.

-400 -200 0 200 00

PP

6

5

~

0 0 ô ~S-

9

-9

0 O—

H

H--

1 -H

13

13

1-3

fS

14 14 1-4 4 14

15

~5-- 1€r—

'râ— 13

i3

~

v. ~ 1940--gleP SP1 a- •• -- _

1141 Kg sal= L1~

Balmoral Resources Grasset Project Loop 2014-3, Line 400E Z Component

Crone Geophysics & Exploration Ltd.

15

-400

-200

0

200

L00

i Balmoral Resources Grasset Project Loop 2014-3, Line 500E X Component

Crone Geophysics & Exploration Ltd.

-400 -200 0 200 00

~ 0

3 PP

5

»f

O 0 O $

9-

16 o

i-6

1~

11

11

11

11

H

H-

12

12

lv 12

2

P2 1-2

3 13

1-4 3 4 14 14

o_ -I 15 15 15 ~5

17 17 _ 17 17 - 17 16 1G--

17- 17

Balmoral Resources Grasset Project Loop 2014-3, Line 500E Z Component

Crone Geophysics & Exploration Ltd.

-400 -200

0

200

00

i Balmoral Resources Grasset Project Loop 2014-3, Line 600E X Component

Crone Geophysics & Exploration Ltd.

-400 -200

0

200 00

~ 0

-6

Q ~ O

7

B

ïl_

9

9

19

1-o

1:

o

0 0

i-2

13

3

~ ~

13 +6-

i5 15

1F 1R

0 0

0 0 0

Balmoral Resources Grasset Project Loop 2014-3, Line 600E Z Component

Crone Geophysics & Exploration Ltd.

-400

-200

0

200

L00

i Balmoral Resources Grasset Project Loop 2014-3, Line 700E X Component

Crone Geophysics & Exploration Ltd.

-400 -200 0 200 00

0 0 o- 0

4 4 4 4

6

~

0 0 ô

B

a

9-

9 9

16-

1 11 0 O-

42 12 12

13 1-a

44 1

1C ~ ~z 17 17 _- 4

Balmoral Resources Grasset Project Loop 2014-3, Line 700E Z Component

Crone Geophysics & Exploration Ltd.

11 ~4

12 42- 1-2

H 1-3

--16 7

-400

-200

0

200

L00

i Balmoral Resources Grasset Project Loop 2014-3, Line 800E X Component

Crone Geophysics & Exploration Ltd.

0 200 00 -400 -200

O ~0

3

_ PP

4-~

Salif 7 ~

19 14

GA CA

17

6

~

7-

O 0 Ô

1B

Balmoral Resources Grasset Project Loop 2014-3, Line 800E Z Component

Crone Geophysics & Exploration Ltd.

-400

-200

0

200

L00

i Balmoral Resources Grasset Project Loop 2014-3, Line 900E X Component

Crone Geophysics & Exploration Ltd.

0 200 00 -400 -200

P 3- 3

~ -7 -7

B- O 0 O

9 -9

16 49- 0 19

11 1--

12 12 1-2

12 1-3

17

15 w-. r O m

n2 E-~ b G ~ v d

37 .... 17 .._ 1~ 17 17 17

4

Balmoral Resources Grasset Project Loop 2014-3, Line 900E Z Component

Crone Geophysics & Exploration Ltd.

O O—

-400

-200

0

200

L00

i Balmoral Resources Grasset Project Loop 2014-3, Line 1000E X Component

Crone Geophysics & Exploration Ltd.

-400 -200 0 200 00

0 0 o 0 3

2

-4- 4

— 6

~

1B

0 O—

4

12 12

14 11

0 15

16 16 16 16 lfi 17 n

1-7 1-7 7 17 17 ,~ 17 ,J2 1~ ~ i

..~ . . L T-47 R ZIG r ~u

Balmoral Resources Grasset Project Loop 2014-3, Line 1000E Z Component

Crone Geophysics & Exploration Ltd.

-400

-200

0

200

L00

i Balmoral Resources Grasset Project Loop 2014-3, Line 1100E X Component

Crone Geophysics & Exploration Ltd.

15 --

0

~ 15 - -15 1-5 -1-5 1-5 w--1.. o m 1-6 10

1-G

17 7

-400 -200

0

200 00

0 0 o- 0

a-

2-

~

7- ~

0 o ~

8

9

10

0 o-

11 11 11 H 11 11

â2 ~ 13 13 1-3

o 0 o-

Balmoral Resources Grasset Project Loop 2014-3, Line 1100E Z Component

Crone Geophysics & Exploration Ltd.

-300 -200 -100 0 100 200 300 i i i i i i i

0 0 o 0

~—

0 o ~

6

7

7- ~

o o- r

~

~ eo

12

Ina an= -- -~ •

Balmoral Resources Grasset Project Loop 2014-4BF(Butterfly), Line 900E X Component

Crone Geophysics & Exploration Ltd.

-300 -200 -100 0 100 200 300

0 0 0

b O

O

O O

O O Q

Balmoral Resources Grasset Project Loop 2014-4BF(Butterfly), Line 900E Z Component

Crone Geophysics & Exploration Ltd.

I /

i

100 150 200 i

250 i

0 0 o-

~-

-----_____-

_e__-

~

0 0 0

,-1 01 0-

0 0 0-,-1 I

Balmoral Resources Grasset Project Loop 1, Hole GR-14-16 Z Component

Crone Geophysics & Exploration Ltd.

0 0 0 0-,-1 I

100 150 200 i

250 i

0 0 o

o 0 ,-,

0 ,-,

I

I

Balmoral Resources Grasset Project Loop 1, Hole GR-14-16 X Component

Crone Geophysics & Exploration Ltd.

100 150 200 i

250 i

Balmoral Resources Grasset Project Loop 1, Hole GR-14-16 Y Component

Crone Geophysics & Exploration Ltd.

100 120 140 160 180 200 220 240 i

Balmoral Resources Grasset Project Loop 1, Hole GR-14-17 Z Component

Crone Geophysics & Exploration Ltd.

i

100 120 140 160 180 200 220 240 I I I I

i Balmoral Resources Grasset Project Loop 1, Hole GR-14-17 X Component

Crone Geophysics & Exploration Ltd.

100 120 140 160 180 200 220 i i i

240 i

I

Balmoral Resources Grasset Project Loop 1, Hole GR-14-17 Y Component

Crone Geophysics & Exploration Ltd.

0 0 o 0 I-I

-4 4-

o 0 I-1

0 ,-, I

0 0 ,-1

I

-------4-------------

80 100 120 140 160 180 200 i i i

I

Balmoral Resources Grasset Project Loop 1, Hole GR-14-18 Z Component

Crone Geophysics & Exploration Ltd.

80 100 120 140 160 180 200 i i i

o 0- ,-1

1

21

0

i

I

0 0 0 0-,-1

I Balmoral Resources Grasset Project Loop 1, Hole GR-14-18 X Component

Crone Geophysics & Exploration Ltd.

0 0 0 0 ,-1

,

----- V /~

_/~

o 0- ,-1

1

-----------..--

o 0 0-,-1 I

4

0 0 I

80 100 120 140 160 180 200 i i i

I Balmoral Resources Grasset Project Loop 1, Hole GR-14-18 Y Component

Crone Geophysics & Exploration Ltd.

80 90 100 110 120 130 1L0 150 i i i

i Balmoral Resources Grasset Project Loop 1, Hole GR-14-19 Z Component

Crone Geophysics & Exploration Ltd.

80 100 120 1 60 i

1 L0

I Balmoral Resources Grasset Project Loop 1, Hole GR-14-19 X Component

Crone Geophysics & Exploration Ltd.

2

O O o-

2

__---____________

~,- _________

4 —4-7------- ci

a) ________----113-

0_

I ,,.

ô ~ 2 m

CQ ~ n2 ~ E-, b

v d

__-------

____--1-6

O

i

I

2

0_.1_____

—2i

0 0 0 0-,-1

0 0- ,-1

1-4-

80 100 120 1 60 i

1 L0

PP

1---~~ Z\~

\______..„------------__

0 0 O. 0 ,-,

---------rs

19--

0

I

P

0 0 —,

o 0 0- ,-1 I

Balmoral Resources Grasset Project Loop 1, Hole GR-14-19 Y Component

Crone Geophysics & Exploration Ltd.

0 0 0 CD--, I

100 125 150 175 200 225 250 275 I I I

Balmoral Resources Grasset Project Loop 1, Hole GR-14-20 Z Component

Crone Geophysics & Exploration Ltd.

i

125 150 175 200 225 250 275 i i i

i Balmoral Resources Grasset Project Loop 1, Hole GR-14-20 X Component

Crone Geophysics & Exploration Ltd.

125 150 175 200 225 250 275 i i i

i Balmoral Resources Grasset Project Loop 1, Hole GR-14-20 Y Component

Crone Geophysics & Exploration Ltd.

125 150 i

175 200 i

250 275 i

100 225

i Balmoral Resources Grasset Project Loop 1,Hole GR-14-20 (Fluxgate) Z Component

Crone Geophysics & Exploration Ltd.

100 125 150 175 200 225 250 275 I I I

i Balmoral Resources Grasset Project Loop 1,Hole GR-14-20 (Fluxgate) X Component

Crone Geophysics & Exploration Ltd.

0 0 o 0 ,-1

o 0 .,-1

„----,, ,22

C \ 2 b 0 d

,-1 I

0 0 .,-1

o 0 0 ,-1

I

100 125 150 175 200 225 250 275 i i i

I

Balmoral Resources Grasset Project Loop 1,Hole GR-14-20 (Fluxgate) Y Component

Crone Geophysics & Exploration Ltd.

150 175 200 225 250 275 300 325 i i i i

Balmoral Resources Grasset Project Loop 5, Hole GR-14-22 Z Component

Crone Geophysics & Exploration Ltd.

i

150 175 200 225 250 275 300 I I I I I

i Balmoral Resources Grasset Project Loop 5, Hole GR-14-22 X Component

Crone Geophysics & Exploration Ltd.

I

0 a) ,-1 C/2

0 0 o— 0 ,-1

o 0 ~

0 0 ~

I _--

PP

150 175 200 225 250 275 300 I I I I I

I

Balmoral Resources Grasset Project Loop 5, Hole GR-14-22 Y Component

Crone Geophysics & Exploration Ltd.

180 200 220 240 260 280 300 320 I I I

i Balmoral Resources Grasset Project Loop 5, Hole GR-14-23 Z Component

Crone Geophysics & Exploration Ltd.

180 200 220 240 260 280 300 320 I I I I I

0 o 0-,-1 ______---1-0

---------

o 0- ,-1

0 0 0-0 ,-1

1 0 ,-1- i

1

o 0 0-,-1 I

PP

Balmoral Resources Grasset Project Loop 5, Hole GR-14-23 X Component

Crone Geophysics & Exploration Ltd.

O O O Q ,-a I

180 200 220 240 260 280 300 320 I I I I I

i Balmoral Resources Grasset Project Loop 5, Hole GR-14-23 Y Component

Crone Geophysics & Exploration Ltd.

150 100 250 200 300 i

Balmoral Resources Grasset Project

Loop 5, Hole GR-14-24 Z Component

Crone Geophysics & Exploration Ltd.

i

150 100 i

250 300 i

200 i

Balmoral Resources Grasset Project Loop 5, Hole GR-14-24 X Component

Crone Geophysics & Exploration Ltd.

i

150 1 00 i

250 300 i

200 i

0 0 o-

0 0 0-,-1

o 0- ,-1

01 0

o 0 0-,-1 I

Balmoral Resources Grasset Project

Loop 5, Hole GR-14-24 Y Component

Crone Geophysics & Exploration Ltd.

0 0 0 0-,-1 I

100 i

200 400 300 i

500 i

Balmoral Resources Grasset Project Loop 5, Hole GR-14-25 Z Component

Crone Geophysics & Exploration Ltd.

i

100 400 200 300 500 i

Balmoral Resources Grasset Project Loop 5, Hole GR-14-25 X Component

Crone Geophysics & Exploration Ltd.

i

100 200 300 400 500 i

I

Balmoral Resources Grasset Project Loop 5, Hole GR-14-25 Y Component

Crone Geophysics & Exploration Ltd.

Crone Geophysics & Exploration Ltd.

APPENDIX IV

STEP RESPONSE DATA PROFILES

Geophysical Survey Report

lB

0 .

150 200 250 .

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

Dev

iati

on

( % Total Theore

tica

l)

4.-

3.-

2.-

1.-

~

~~

0. ~1 1 I32 1 5C3 4 I~ 1 1 1 1 ~ 1 S: 1 ,[3 I ~I' 1" 1 1 1 1 S2 1 SP I 1 1 1 1 1 I SI2 1 S-13-1

5.-

0.

19

Pu

lse

EM

Off

—ti

me

Channe

ls 1

7-2

2

-5. -

-20. -

Balmoral Resources Grasset Project

Loop 1, Hole GR-14-16 Z Component

Crone Geophysics & Exploration Ltd.

Dev

iati

on fr

om

( % Total Theore

tica

l)

&- _ O ,-,

100 150 200 250 ~ m ~ 2000. co u

czça o

0.

_ U U U ô 0:5 (0 a'-2000. —

O p4

U ~

4 • rd (2 ~ a c--) —4000.— II II II

Cn —6000. —

4.-

3.—

I I 1 SI2 I S13 I—~14 1~1 ~1 11 SI2 1 S1 3 I I 1 1 I 1 1 SI2 I SI3 I

20. —

15. —

a) 10. - ~ ~ ~ U I I m 5.

F4 p 0. ~ p

a • ~ —5.—

-t--1--r-

Balmoral Resources Grasset Project Loop 1, Hole GR-14-16 X Component

Crone Geophysics & Exploration Ltd.

Dev

iati

on fr

om

( % Total Theore

tica

l)

20. -

15. -

1 00 5000. -

u a ~

0.

150 200 250 .

~ --6-• U

Ed a'-5000. -

711

U E-

o ` 10000.

I I

,-~

u" 15000. -

~

1 0,2

c.F, 0 ô ~ ~ m G w ~ z G ~

o ~ + +

~ O a •- U)

Q

4.-

3.-

2.-

1.

I I~I S~

~12~ I I, 1 1 1 1 1S2 1 0.

—1.-

I I 1 S2 1 ,13 1 1 1 12 I

Balmoral Resources Grasset Project Loop 1, Hole GR-14-16 Y Component

Crone Geophysics & Exploration Ltd.

220

240 100 40000. -

a m

u] 30000. -

c.)

Ed 120000. - ~ \ U (2 ~ —10000. - I I

,-~ 0.

40. -

20. -

120 140 160 180 200 i i i i i

- 20.

- 40.

- 60. -

5.

0.

-10.

- 15.

- 20.

2000. -

1500. -

1000. -

U a) 500. - \

I I I I I I I I I I I

Dev

iati

on fr

om

( % Total Theore

tica

l)

Balmoral Resources Grasset Project Loop 1, Hole GR-14-17 Z Component

Crone Geophysics & Exploration Ltd.

Dev

iati

on fr

om

( % Total Theore

tica

l)

i J, 10.—

(07 O D â~ ti m 5. —

G ~ o id

r6 a •~ ~

~ Q ~

0.

—5.

100.

~ —100.

~ ~ U

w ~ 1) —200. O ,-,

~ ~ G

p —300. ~ p

• ,C

a ~ —400.

AA._d.„..,„......,___, G w ~

1 • m 15000. — co u .. a

â ~ ~ 10000.

~ ra U ~ U

ô ~ (0 a' 5000. —

o U 4 co (2 � a ~ 0. II II II

cf —5000. —

15. —

10. —

5.-

0.

—5.

—10. —

20. —

15. —

120 140 160 180 200 220 240 i i i i i i i

Balmoral Resources Grasset Project Loop 1, Hole GR-14-17 X Component

Crone Geophysics & Exploration Ltd.

10.—

( % Total Theore

tica

l)

—10.

Dev

iati

on fr

om

—20.

—30.

—40. —

—10.

0,2

~ o ~ —15.

G

G w ~

o —(21 —20.

al

—) a) ~ —25.

2000. —

1500. —

~ 1000. - H ~ ~ U

I I m 500. O

N

~ \

~ ~ G W

-C C-.) -500. —

100 120 140 160 180 200 220 240 7-, ~ ~ 15000. I I I I co u

.. co a

â ~ cf.)10000. — As~.

~ 7,i 0-1-c U . 0

N 0:5(0U

~ 5000.—

~ _pco~

U F 4 E—,

1-1 0,_....

0. i i I I I I I I I I I I I I I I I I I I I I I I I

_111111,4111111116,,

II II II p, 12. ~ 121_, cf) -5000. —

Balmoral Resources Grasset Project Loop 1, Hole GR-14-17 Y Component

Crone Geophysics & Exploration Ltd.

Dev

iati

on fr

om

( % Total Theore

tica

l)

—5. —

8.—

6.—

50.

~ — 5 0 .

~ ~ U

w ~ ~ -100. O ~ \

~ ~ G

F4 p ̀-150.

~ p

C_) —200.

80 ~ 40000. — ~ a 0 Ei]; 30000. —

� • U Ed 120000. — � \ U 71 ~ ̀1_0000. —

I I

,-~

0.

20. —

100 120 140 160 180 200 i i i i i i

I I I I I I I I I

Balmoral Resources Grasset Project Loop 1, Hole GR-14-18 Z Component

Crone Geophysics & Exploration Ltd.

80

20000.— u a

15000.-

-c ~ U

Ed 1'10000. ~ \ U (2

5000. — I I

,-~

0.

100 120 140 160 180 200 i i i i i i

—50.-

-100. - ~ ~ C„2

I °n' —150.

O ~ \

~ ~ G

F4 p —200. - LI)

-C

~ —250. —

Dev

iati

on fr

om

( % Total Theore

tica

l)

20.

15.

10.

5.

0 .

—5.

0 .

i i i i i i ~~29~

Balmoral Resources Grasset Project Loop 1, Hole GR-14-18 X Component

Crone Geophysics & Exploration Ltd.

Dev

iati

on fr

om

( % Total Theo

reti

ca

l)

80 20000. —

a ~ Ei]; 15000. —

U U ~ 1'10000. — ~ \ U E-

5000. — I I

,-~

0.

100 120 140 160 180 200 i i i i i i

~

1.-

0.

7

d~ ~

0,2 ~ -

En O ~ G w ~ co 4 o 7d u

r6

~ Q ~

~ H ~ ~

I I

O ~

ci)

F4 p ~ p

0 ~

U m \

`

- 1 . -

—2. —

—3. -

—4.-

200. —

150. —

100. -

50.

0

2

i~~~ 1 1 r 1_7

—50.—

Balmoral Resources Grasset Project Loop 1, Hole GR-14-18 Y Component

Crone Geophysics & Exploration Ltd.

Dev

iati

on fr

om

( % Total Theore

tica

l)

80 90 100 110 120 130 1L0 150 i i i i i i i ~ m

,41 50000. —

co u

— • ~ m 40000. — a

0] iIr°°° o • -P

Z:,20000. Z:,20000.. co

— ~ E-11-1 II II II 10000. -

p, Q ~ H R Cf] 0.

T

i

15. —

10. —

5.-

—5. —

—10. —

5. -

4.—

20.

0.

~ —20. ~ ~

~ U I I

i- m —40.

O ~ \

~ ~ G

n~ p —60.

~ —80.

-

Balmoral Resources Grasset Project Loop 1, Hole GR-14-19 Z Component

Crone Geophysics & Exploration Ltd.

Pu

lse

EM

Off

—ti

me

Channe

ls 1

7-2

2

-40. -

0. 2

~

80 100 120 1L0 160 m 15000. - ,(0 ~ ~

ra 12-1 10000. - 7d RI .U. ~ ~ rx ~ °~

U 5000. -

U E 1

~ rd -(21 a 0.

II II II

— 5000.-

Dev

iati

on

( % Total Theore

tica

l)

10. -

5. -

0, S1 r

-5. -

-10. -

-15. -

4.—

3.—

2.—

1.—

40. -

20. - 17-

Balmoral Resources Grasset Project

Loop 1, Hole GR-14-19 X Component

Crone Geophysics & Exploration Ltd.

80 100 120 10 160

20000. - ~ _co • u .

a-j a

~ 15000. -

~ P-1.-0

~ 124

• ~ °~10000. T~ ~ PP

O Fi -p U

4 rd (2

E" a ~ 5000. - II II II

Cf- ] 0 , I I

10. -

5. -

( % Total Theore

tica

l)

0 .

-5. -

Dev

iati

on

- 10. -

- 15. -

4. -

3. -

2. -

1. -

60. -

40. -

Pu

lse

EM

Off

—ti

me

Channe

ls 1

7-2

2

20. -

-20. -

Balmoral Resources Grasset Project

Loop 1, Hole GR-14-19 Y Component

Crone Geophysics & Exploration Ltd.

100 40000. —

~ T

a m

30000. -

~ U Ed 120000. - ~ \ U c2 ~ —10000. - I I

,-~ cf)

125 150 175 200 225 250 275

. i .

_ ~

P

I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 .

8.-

6.-

-2. -

200. -

100. -

Dev

iati

on fr

om

( % Total Theore

tica

l)

B almoral Resources Grasset Project Loop 1, Hole GR-14-20 Z Component

Crone Geophysics & Exploration Ltd.

Dev

iati

on fr

om

( % Total Theore

tica

l)

300. -

200. -

f~

125 150 175 200 225 250 275 ~ m ~ 15000. I I I

~ u T~ ~~

a ~ ~i 10000. — .

-Z1 U ~~_ . ~ U

N ▪ Ix (0 ~ 5000. -

� • ~ U F � ~ ~~ � a0 0. i i i I I I I I I .. ~~ II II II p, 12. ~ 121_, cf) -5000. -

Balmoral Resources Grasset Project Loop 1, Hole GR-14-20 X Component

Crone Geophysics & Exploration Ltd.

1 ~

2. -

17111-- 1

4. -

300. -

200. -

Dev

iati

on fr

om

( % Total Theore

tica

l)

4000.

a m

3000. -

o Ed a' 2000. - ~ \ U (2 ~" 1000. - I

,-~ 0. I I I I I I I I I I I

125 150 175 200 225 250 275

Balmoral Resources Grasset Project Loop 1, Hole GR-14-20 Y Component

Crone Geophysics & Exploration Ltd.

0.

U —20. —

`. —40. —

—60. —

0.

40. —

30. —

20. —

10. —

0.

—10. —

8. -

6. -

4.-

2.-

0.

—2. —

40. —

20. —

I I I I I I I I I I I

I I I

S4 4

150 175 200 225 250 275 300 325 , m ~ 25000. ----_ I I I I I I co u

— ~ m 20000. — W U U]

o ~ ~ 15000. — ~ ~ ~ °' x ~

ô ~ ô ~10000.—

4 co —(21 F a (.) II II II 5000. —

p, Q ,--1 P-, Cf]

Dev

iati

on fr

om

Balmoral Resources Grasset Project Loop 5, Hole GR-14-22 Z Component

Crone Geophysics & Exploration Ltd.

( % Total Theore

tica

l)

Dev

iati

on fr

om

150 175 200 225 250 275 300

~ ~ 2000. i i i i i

(0 u T ~ ~ _ ~ ~

0.

~ •~

—8000. —

20.—

10. —

0. * i

—10. —

—20. —

—30. —

2.—

0.

i —2. —

0,2

cn O D â~ —4. G w ~

~ G ~ o

u

—6.— co

P. ;

~ Q

—8.—

40.

30.

20.

U a) 10.

Balmoral Resources Grasset Project Loop 5, Hole GR-14-22 X Component

Crone Geophysics & Exploration Ltd.

ra o ~ Li) ~ 2000.

~ ~ ~ a) 4~

6-1Ix

~ ô —

4 Et (2 F a ~

II II II —6000. —

• Q H ~ Cf]

( % Total Theore

tica

l)

Dev

iati

on fr

om

( % Total Theore

tica

l)

10. -

150

75 200 225 250 275 300

15. -

1

Balmoral Resources Grasset Project Loop 5, Hole GR-14-22 Y Component

Crone Geophysics & Exploration Ltd.

Pu

lse

EM

Off

—ti

me

Channe

ls 1

9-2

4

180 200 220 240 260 280 300 320 � ~ 20000. —~~ i i i i

co u .. czç a

â ~ ~ 15000. —

7,i ra ~ U — ~ U • _p ~ 124 (0 1)10000. —

6 _p U E-,

4 rd 02 E" a ~ 5000. — II II II

(1, ü ,-1 E—, R, i/] 0, 1 1 1 1 1 I I I I I I I I I I I I I I I I I I I

5. — 1

10. —

( % Total Theore

tica

l)

5.—

Dev

iati

on

—5. —

—10. —

4.-

3.-

2.-

1.-

0

set

—1. —

Balmoral Resources Grasset Project

Loop 5, Hole GR-14-23 Z Component

Crone Geophysics & Exploration Ltd.

180 200 220 240 260 ~ -C-C) o. I I I I I I I I I i I

~

â (1)-

1000.

-Z1 •---c.3•.U. ~ U

ô~ (0 1)-2000. i—

~ 1D4

~ rd —(21 ~ a c--) —300D.—

II II II

U — 4000. —

15. —

10. —

280 300 320

Dev

iati

on fr

om

( % Total Theore

tica

l)

5.—

—5. —

— 10. —

2. -

1.— S4

iJ ~ i~i3

i i ------T----iI I12

10. —

5. —

~ ~ U

I I m —5 . O ~ \

~ G

p —10.— n) Er:

P, C-.) — 15. —

Balmoral Resources Grasset Project Loop 5, Hole GR-14-23 X Component

Crone Geophysics & Exploration Ltd.

Dev

iati

on fr

om

( % Total Theore

tica

l)

o . � • u

cizç a â —1000. —

7d al U ~ U ô ~ ~ cl)-2000. —

o 1D4 co

4 rd (2 ~ a c--) —3000.— II II II

u —4000.

180 200 220 240 260 280 300 320 1 1 1 1 1 1 1 1

~ 10.

~ ~ U I I m

O

~ ~ G

W p ` . ~ G

P, • C-) — 5. —

~

211

2.-

1.—

20. —

15. —

Balmoral Resources Grasset Project Loop 5, Hole GR-14-23 Y Component

Crone Geophysics & Exploration Ltd.

400. —

300. —

~ 200.

~ ~ U I I 100. -

O ~ ~ G W N

P, C.-) —100. —

Dev

iati

on

fro

m

( % Tot

al Theo

reti

cal)

100 150 200 250 300

.

_ T

1)20000. —

.— 10000. —

0. H I I I I I I I I I H I I I I I I I I I H

20. —

10. —

0. A --1 I I I I

.111, 3-1

—10. —

—20. —

—30. —

u] 30000.

Balmoral Resources Grasset Project Loop 5, Hole GR-14-24 Z Component

Crone Geophysics & Exploration Ltd.

30. —

- 10. -

100 150 200 250 300

Dev

iati

on fr

om

m 15000. — co u

a

â ~ 10000.

~U ~ U N 0 a' 5000.

o oo 4 rd (2

II II II

Cf) —5000. —

60. —

40. —

20. —

0.

PP

—20. —

—40. —

( % Total Theore

tica

l)

40. —

Balmoral Resources Grasset Project Loop 5, Hole GR-14-24 X Component

Crone Geophysics & Exploration Ltd.

5. -

0.

200. -

150. -

~ 100.

~ ~ U II m 50. - w 6~ n

O

ci)

F4 p D. ~ p

0 ~

ça.) -50. -

Dev

iati

on fr

om

( % Total Theore

tica

l)

1 00 6000. I-• -.

Ea, ~

150 200 250 300 46.i

CI] 4000. ~

-0

C) (0 cl) 2000. ~ \ U E- 71

0. 111111111111

I I

,-~

-2000. -

Balmoral Resources Grasset Project Loop 5, Hole GR-14-24 Y Component

Crone Geophysics & Exploration Ltd.

0.

PP -5. -

-20. - Dev

iati

on fr

om

( % Total Theore

tica

l)

-10. -

-15. -

P

'f-t-1 4-1 I I I I I I I I I I I I

V'

1-ci) 25000.- co u

20000. - 0, ~~

o IiÎ'°°° ô ~ 4 co -cd

a

II II II 5000. -

R-, O.

100 200 300 400 500 .i . i.

5. -

10. -

5. -

Balmoral Resources Grasset Project Loop 5, Hole GR-14-25 Z Component

Crone Geophysics & Exploration Ltd.

Dev

iati

on fr

om

( % Total Theore

tica

l)

100 200 300 400 500 . . ~ 15000. —

a ~ E,1 10000. —

~ T U U co a' 5000. — ~ \ U E-

0. I I

,-~ cr] —5000. —

10.

5.

~ 1..

'1%,„4%:.

I I I I I I I I I I 1 1 1

~-~_•-

Balmoral Resources Grasset Project Loop 5, Hole GR-14-25 X Component

Crone Geophysics & Exploration Ltd.

—• Cr) 3000. co u

â ~ 2000.

-c-o 0-1-c -7.'sU ~ U

ô • rx ÷'CL) 1000.

O —P U 4 co c2

II II II

P, -1000.

20. -

15. -

10. -

5.-

0.

-5. -

8.-

6.-

1 4.-

0,2 m ct) O â~ ti m 2. G w ~ ~ G H

o -(21 ~ + + O.

•~ F

-) Q -2.-

50. -

0.

~ -50.

~ ~ U

• a' -100.

—Cr) -150. —

L1.)

O ~ P, -200. -

Dev

iati

on fr

om

( % Total Theore

tica

l)

100 200 300 400 500

. . .

Balmoral Resources Grasset Project Loop 5, Hole GR-14-25 Y Component

Crone Geophysics & Exploration Ltd.

Crone Geophysics & Exploration Ltd.

APPENDIX V

CRONE INSTRUMENT SPECIFICATIONS

Geophysical Survey Report

C~ a

Crone Pulse EM

System Description

SYSTEM DESCRIPTION

The Crone Pulse EM system is a time domain electromagnetic method (TDEM) that utilizes an alternating pulsed primary current with a controlled shut-off and measures the rate of decay of the induced secondary field across a series of time windows during the off-time. The system uses a transmit loop of any size or shape. A portable power source feeds a transmitter which provides a precise current waveform through the loop. The receiver apparatus is moved along surface lines or down boreholes.

The transmitter cycle consists of slowly increasing the current over a few milliseconds, a constant current, abrupt linear termination of the current, and finally zero current for a selected length of time in milliseconds. The EMF created by the shutting-off of the current induces eddy currents in nearby conductive material thus setting-up a secondary magnetic field. When the primary field is terminated, this magnetic field will decay with time. The amplitude of the secondary field and the decay rate are dependent on the quality and size of the conductor. The receiver, which is synchronized to the off-time of the transmitter, measures this transient magnetic field where it cuts the surface coil or borehole probe. These readings are across fixed time windows or "channels".

SYSTEM TERMINOLOGY

Ramp Time "Ramp time" refers to the controlled shut-off of the transmitter current. Three ramp times

are selectable by the operator; 0.5ms, 1.0ms, and 1.5ms. By controlling the shut-off rather than having it depend on the loop size and current ensures that the same waveform is maintained for different loops so data can be properly compared.

The 1.5ms ramp is the normally used setting for good conductors. It keeps the early channel responses on scale and decreases the chance of overload. The faster ramp times of 1.0ms and 0.5ms will enhance the early time responses. This can be useful for weak conductors when data from the higher end of the frequency spectrum is desired.

Time Base Time base is the length of time the transmitter current is off (it includes the ramp time). This

also equals the on time of the current. Time bases are available for both 60Hz and 50Hz noise rejection respectively:

• 8.33ms (30Hz), 16.66ms (15Hz), 50ms (5Hz), 100ms (2.5Hz), 150ms (1.67Hz), 300ms (0.833Hz), 500ms (0.5Hz), 750ms (0.33Hz), 1000ms (0.25Hz)

• 10ms (25Hz), 20ms (12.5Hz), 50ms (5Hz), 100ms (2.5Hz), 150ms (1.67Hz), 300ms (0.833Hz), 500ms (0.5Hz), 750ms (0.33Hz), 1000ms (0.25Hz)

Since readings are taken during the off cycles, the time base will have an effect on the receiver channels. Normally, a standard time base is selected for the type of system and survey being used, but this can be changed to suit a particular situation. A longer time base is preferred for conductors of greater time constants, and in surveys such as resistive soundings where more channels are desired.

Zero Time Set The term "zero time set" or "ZTS" refers to the starting point for the receiver channel

measurements. It is manually set on the receiver by the operator thus allowing adjustments for the ramp times and fine tuning for any fluctuations in the transmitter signal.

Receiver Channels The rate of decay of the secondary field is measured across fixed time windows which

occupy most of the off-time of the transmitter. These time windows are referred to as "channels". These channels are numbered in sequence with "1" being the earliest. The analog and datalogger receivers measured eight fixed channels. The digital receiver, being under software control, offers more flexibility in the channel positioning, channel width, and number of channels.

PP Channel The PEM system monitors the primary field by taking a measurement during the current

ramp and storing this information in a "PP channel". This means that data can be presented in either normalized or normalized formats, and additional information is available during interpretation. The PP channel data can provide useful diagnostic information and helps avoid critical errors in field polarity.

Synchronization Since the PEM system measures the secondary field in the absence of the primary field, the

receiver must be in "sync" with the transmitter to read during the off-time. There are three synchronization methods available: cable connection, radio telemetry, and crystal clock. This flexibility enhances the operational capabilities of the system.

SURVEY METHODS

The wide frequency spectrum of data produced by a Pulse EM survey can be used to provide structural geological information as well as the direct detection of conductive or conductive associated ore deposits. The various types of survey methods, from surface and borehole, have greatly improved the chances of success in deep exploration programs. There are eight basic profiling methods as well as a resistivity sounding mode.

Moving Coil A small, multi-turn transmitter loop (13.7m diameter) is moved for each reading while the

receiver remains a fixed distance away. This method is ideal for quick reconnaissance in areas of high background conductivity.

Moving Loop Same as Moving Coil method, but with a larger rectangular transmit loop (100 to 300

meters). This method provides deeper penetration in areas of high background conductivity, and works best for near-vertical conductors. This method can be used in conjunction with the Moving In-loop survey for increased sensitivity to horizontal conductors.

Moving In-Loop A rectangular transmit loop of size 100 to 300 meters is moved for each reading while the

receiver remains at the center of the loop. This method provides deep penetration in areas of very high background conductivity, and works best for near-horizontal conductors. It can be used in conjunction with the Moving Loop survey.

Large In-Loop A very large, stationary transmit loop (800m square or more) is used, and survey lines are

run inside the loop. This mode provides very deep penetration (700m or more) and couples best with shallow dip conductors (<45 deg.) under the loop.

Deep EM A large, stationary transmit loop is used, and survey lines are run outside the loop. This mode

provides very deep penetration, and couples best with steeply dipping conductors (>45 deg.) outside the loop.

Borehole (Z Component only) Isolated Borehole: A drill hole is surveyed by lowering a probe down a hole and surveying it

with a number of transmit loops laid out on surface. The data from multiple loops gives directional information on the conductors.

Multiple Boreholes: One large transmit loop is used to survey a number of closely spaced holes. The change in anomaly from hole to hole provides directional information. These methods have detected conductors to depths of 2500m from surface and up to 200m from the hole.

3-D Borehole Drill holes are surveyed with both the Z and the XY borehole probes. The X and Y

components provide accurate direction information using just one transmit loop. Since the probe rotates as it moves down the hole a correction is required for the X-Y data. This is accomplished in one of two ways. The measurement of the primary field from the "PP" channel can be used to apply a "cleaning" algorithm to remove most of the secondary field contamination, and compare this to theoretical values. The amount of probe rotation is then calculated, and the correction can be made. The second method involves the use of an optional orientation tool for the X-Y probe. This attachment uses dip meters to calculate the probe rotation. A third method uses another rotation tool with integrated 3-axis accelerometers and 3-axis magnetometers which can be used to correct rotation on steeply dipping holes including vertical.

Underground Borehole Underground drill holes can be surveyed in any of the above mentioned borehole methods

with one or more transmit loops on the surface. Near-horizontal holes can be surveyed using a push-rod system.

Resistivity Soundings By reading a large number of channels in the centre of a transmit loop it is possible to

perform a decay curve analysis giving a best-fit layer earth model using programs such as ARRTI or TEMIX.

EQUIPMENT

Transmit Loops The PEM system can operate with practically any size of transmit loop, from a multi-turn

circular loop 13.7m in diameter, to a 1 or 2 turn loop of any shape up to 1 or 2 kilometers square using standard insulated copper wire of 10 or 12 gauge. The multi-turn loop is made in two sections with screw connectors. The 10 or 12 gauge loop wire comes on spools in either 300m or 400m lengths. The spools can be mounted on pack frame wire winders for laying out or retrieving.

Power Supply The PEM system has been produced in 2 varieties: high power (4.8 KW), and low power (2.4

KW). The low power PEM system normally operates with an input voltage from 24V to 240V with a maximum output current of 20 amps. For very low power surveys a 20amp/hr 24V battery can be used. The high power system operates on a continuously variable voltage input up to 240V with a maximum output current of 30 amps. The power supply requires a motor generator and a voltage regulator to control and filter the input voltage to the transmitter.

Specifications: PEM Motor Generator • (2.4 KW) 4.5 hp Robin EH34 engine, 120V 3-phase alternator • (4.8 KW) 11 hp Robin RGV6100 240V/120V generator (1-phase) • cable output to regulator • fuse type overload protection • steel frame • external gas tank

• optional packframe for low-power generator • wooden shipping box • unit weight: 33kg (2.4 KW); 81kg (4.8 KW) • shipping weight: 47kg (2.4 KW); 100kg (4.8 KW)

Specifications: PEM Variable Voltage Regulator • High Power

■ Continuously variable voltage output up to 240V ■ 30 amp maximum current ■ Integrated sealed aluminum case ruggedized for shipping ■ Shipping weight 18kg

• Low Power ■ selectable voltage between 24v and 120v ■ 20amp maximum current ■ anodize d aluminum case ■ padded wooden shipping box ■ unit weight 10kg; shipping weight 18kg

• fuse and internal circuit breaker protection • cable connections to motor generator and transmitter

Specifications: PEM Transmitter • High Power

■ Timebases • 8.33ms (30Hz), 10ms (25Hz), 16.66ms (15Hz), 20ms, (12.5Hz), 50ms (5Hz), 100ms

(2.5Hz), 150ms (1.67Hz), 300ms (0.833Hz), 500ms (0.5Hz), 750ms (0.33Hz), 1000ms (0.25Hz)

■ ramp times: 0.5ms, 1.0ms, 1.5ms ■ operating voltage: continuously variable input up to 240V ■ output current up to 30amp maximum ■ optional current control feedback system features constant current output with ±0.1 amp

precision ■ integrated sealed aluminum case ruggedized for shipping with shock protection

• Low Power ■ Timebases

• 8.33ms (30Hz), 10ms (25Hz), 16.66ms (15Hz), 20ms, (12.5Hz), 50ms (5Hz), 100ms (2.5Hz), 150ms (1.67Hz), 300ms (0.833Hz)

■ operating voltage: 24v to 120v ■ output current: 5amp to 20amp ■ anodized aluminum case ■ optional pack frame ■ unit weight 12.5kg; shipping weight 22kg ■ padded wooden shipping box

• monitors for input voltage, output current, shut-off ramp, tx loop continuity, instrument temperature, and overload output current

• automatic shut-off for open loop, high instrument temperature, and overload • fuse and circuit breaker overload protection • three sync modes:

■ built-in radio and antenna ■ cable sync output for direct wire link to receiver or remote radio ■ crystal clock connection with built-in optical isolation

Receiver The receiver measures the rate of decay of the secondary field across several time channels.

The Crone Digital Receiver, in use since 1987 uses software control, offering a variety of programmable channel configurations.

Specifications: Digital PEM Receiver • 26 bit (156dB) dynamic range • operating temperature -40°C to 50°C • built-in non-volatile memory • optional pack frame • unit weight 15kg; shipping weight 25.5kg • padded wooden shipping box • Menu driven operating software system offering the following functions:

• controls channel positions, channel widths, and number of channels ■ Timebases: 8.33ms (30Hz), 10ms (25Hz), 16.66ms (15Hz), 20ms, (12.5Hz), SOms (5Hz),

100ms (2.5Hz), 150ms (1.67Hz), 300ms (0.833Hz), 500ms (0.5Hz), 750ms (0.33Hz), 1000ms (0.25Hz)

■ ramp time selectable ■ sample stacking from 1 to 65536 ■ automatic gain and spike rejection ■ scrolling routines for viewing data ■ graphic display of decay curve and profile with various plotting options ■ routines for memory management • control of data transmission ■ provides information on instrument and operating status

Sync Equipment There are three modes of synchronization available; radio, cable, and crystal clock. The radio

sync signal can be transmitted through a booster antenna from either the PEM Transmitter internal radio or through a Remote Radio.

Specifications: Sync Cable • 2 conductor, 24awg, Teflon coated • approx. 900m per aluminum spool with connectors

Specifications: Remote Radio • operating frequency 27.12mhz • 12V rechargeable gel cell battery supply • fuse protection • sync wire link to transmitter • coaxial link to booster antenna • anodized aluminum case • unit weight 2.7kg

Specifications: Booster Antenna • 8m, 4 section aluminum mast • guide rope support • 1/4 wave CB fiberglass antenna • range up to 2km • coaxial connection to transmitter or remote radio

Specification: Crystal Clocks • heat stabilized crystals • 24V rechargeable gel cell battery supply

• anodized aluminum case • rx unit can be separate or housed in the receiver • outlet for external supplementary battery supply

Surface PEM Receive Coil The Surface PEM Receive Coil picks up the EM field to be measured by the receiver. The coil

is mounted on a tripod that can be positioned to take readings of any component of the field.

Specifications: Surface PEM Receive Coil • ferrite core antenna • VLF filter • 10khz bandwidth • two 9v transistor battery supply • tripod adjustable to all planes • unit weight 4.5kg; shipping weight 13.5kg • padded wooden shipping box

Surface SQUID sensor CSIRO 1-, 2- or 3- axis high-sensitivity superconducting sensor measures magnetic field in the sub-pT

range.

Specifications: Surface SQUID sensor • liquid nitrogen cooled, 12 hour operation between reservoir refills • low-noise floor —350fT/ ✓Hz • man-portable sensor and control system • moving loop, or large loop survey configuration • solid teflon non-magnetic housing • operational temperature range: -40°C to 40°C • total system packaged shipping weight (without liquid nitrogen): 62kg

Borehole PEM Z Component Probe The Z component probe measures the axial component of the EM field. The Z component

data is not affected by probe rotation so no correction is required.

Specifications: Borehole PEM Z Component Probe • ferrite core • dimensions: length - 1.6m; dia - 3.02cm (3.15cm for high pressure tested probes) • internal rechargeable NiCd battery supply • replaceable heat shrink tubing for abrasion protection • pressure tested for depths 1300m, 2000m, and 2800m • packaged in padded cover and aluminum tube • shipped in padded wooden box; total weight 17kg

Borehole PEM XY Component Probe The XY probe measures two orthogonal components of the EM field perpendicular to the

axis of the hole. Correction for probe rotation can be achieved by mathematical theoretical primary field reduction or more commonly with an attached orientation tool sensor.

Specifications: Borehole PEM XY Component Probe • ferrite core • dimensions: length - 2.01m; dia - 3.02cm • internal rechargeable ni-cad battery supply

• selection of X or Y coils by means of a switch box on surface or automatic switching with Digital receiver

• replaceable heat shrink tubing for abrasion protection • pressure tested for depths to 2800m • packaged in padded cover and aluminum tube • shipped in padded wooden box; total shipping weight 20kg

Specifications: Orientation Tool • 2 axis tilt sensors • accuracy ± 0.1 deg. • operating range -88 to -10 deg. • dimensions: length - 0.94m; dia - 28.5mm • packaged in padded cover and aluminum tube • shipped in padded wooden box; total shipping weight 14kg

Specifications: Rotation Angle Direction (RAD) Tool • integrated 3-axis accelerometers and 3-axis magnetometers • dip and roll accuracy: ±0.5°, azimuth accuracy: ±1.0° • operating range: all • simultaneous 3D magnetometer borehole survey by station • optional continuous logging mode • dual 3-axis sensors provide an alternative complete borehole Dip-Azimuth measurement • dimensions: length - 0.75m; dia - 31.8mm • packaged in padded cover and aluminum tube • shipped in padded wooden box; total shipping weight 14kg • NiCd battery provides all-day operation

• Length - 0.93m; dia - 28.6mm • Packaged in padded cover and aluminum tube • Shipped in padded wooden box; total shipping weight 14kg

Borehole Equipment To lower the probe down a drill hole requires a cable and spool, winch assembly frame and

cable counter. Borehole surveys also require equipment to "dummy probe" the hole before doing the survey.

Specifications: Borehole Cable • two conductor shielded cable • kevlar strengthened • lengths are available up to 2600m on three sizes of spools • shipped in wooden box

Specifications: Slip Ring • attaches to side of borehole cable spool providing a connection to the receiver while allowing the

spool to turn. • VLF filter • pure silver contacts

Specifications: Borehole Winch Frame • welded aluminum frame • removable axle • chain driven, 3 speed gear box • hand or optional power winding • hand brake and lock

• optional chain-gear safety cover • two sizes: standard for up to 1300m cable; large for longer cables • shipped in wooden box

Specifications: Borehole Counter • attaches to the drill hole casing • calibrated in meters • shipped in wooden box; total weight 13kg

Specifications: Dummy Probe and Cable • solid steel or steel pipe • same dimensions as borehole probe • shear pin connection to dummy cable • steel dummy cable on aluminum spool • cable mounts on borehole frame

• various lengths to 2600m on 3 spool sizes.

Crone Geophysics & Exploration Ltd.

APPENDIX VI STATEMENT OF QUALIFICATIONS

Geophysical Survey Report

Statement of Qualifications

I, Kevin Ralph, P.Geo do hereby certify that;

1. I am a permanent employee of Crone Geophysics &Exploration Ltd through their office at 2135 Meadow pine Blvd. Mississauga, Ont.

2. I am a graduate of Memorial University of. Newfoundland with a B.Sc. in Geology/ Geophysics in 1992.

3. I am registered as a Professional Geoscientist in the Province of Ontario

4. I have practiced my profession continuously since graduation. My relevant experience for the purpose of the report is:

• Chief Geophysicist, Crone Geophysics, Mississauga, ON: 2008-present

• Senior Project Geophysicist, Crone Geophysics, Mississauga, ON: 2002-2008

• ,Project Geophysicist, Crone Geophysics, Mississauga, ON 1995-2002

• Contract Geophysicist — Kevin Ralph, Flatrock, Nfld. 1992 to 1995

5. This report by A.M. Khan was prepared under my direct supervision, and all statements made in this report represent the best opinion and judgment of the author based on the information available at the time of writing of this report.

Kevin Ralph, B.Sc., P.Geo Geophysicist June, 2014

% . ~

7 : KEVIN RALPH 4 b PRACTISING MEMBER

0839 \o

A, Tr~ROQ • „.,

REÇU AU MRNF

I05 MAI 203

f.. ~ -Cil Y1 /4! DES TITRES MINIERS

1(19g/S0

Darin Wagner

CERTIFICATE OF QUALIFICATION Darin Wagner

Maple Ridge, BC, Canada

I, Darin Wagner, of Maple Ridge, B.C. do hereby certify that:

• I am a Geologist, and the President and CEO of Balmoral Resources Ltd. I have held this position since April 2010

• I am a professional geoscientist in good,standing in the Provinces of Ontario and Quebec

• I have obtained a B.Sc. in Earth Sciences from the University of Waterloo (1989) and an M.Sc. in Earth Sciences from Carleton University in Ottawa, Ontario (1993)

• I have been\a racticing geoscientist for 23 years

• t' have been involved with the planning and execution of the program described herein

• I have reviewed âÎl of the information from the work program carried out by Crone Geôphysics and Exploration Ltd. described herein and represent that the information contained herein is accurate to the best of my knowledge

Signed in V-ncouver > Ath, 2015,

REÇU AU MRNF

2 7 MAI 2015

•..I?ECTION DES TITRES MINIERS

Crone Geophysics & Exploration Ltd.

APPENDIX VII LIST OF EXPENDETURES

Geophysical Survey Report

Pages(s) retirée(s) - Information non pertinente Irrelevant page(s) have been withdrawn