Expansion of Grain based Distillery from 120 KLPD to 145.2 ...

19

Transcript of Expansion of Grain based Distillery from 120 KLPD to 145.2 ...

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 1

APPENDIX - I

(See paragraph - 6)

FORM - 1

(I) Basic Information

S. No. Item Details

1. Name of the project/s Expansion of Grain based distillery from 120 KLPD to 145.2 KLPD by

modernization and efficiency improvement at Industrial FEZ, Village

Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar

(Mohali), Punjab by M/s. Rajasthan Liquors Pvt. Ltd.

2. S. No. in the schedule As per EIA Notification dated 14th Sep, 2006 and as amended on 13th June,

2019, the project falls under Category “B”, Project or Activity ‘5(g)’

Distilleries but since the General Condition i.e. the Interstate boundary of

Punjab and Haryana lies at an approx distance of 2.2 km in ENE direction

from plant site thus this project will be considered as Category “A” and will

be appraised at Central level in MoEFCC, New Delhi.

3. Proposed capacity / area/ length/

tonnage to be handled/

command area/ lease area/

number of wells to be drilled

Proposed Capacity: Grain based distillery (120 KLPD to 145.2 KLPD)

Proposed Area: 4.25 Ha (10.5 Acres); proposed expansion will be done

within the existing plant premises by modernization and efficiency

improvement.

4. New / Expansion / Modernization Expansion Project

5. Existing Capacity / Area, etc. Existing Capacities: 120 KLPD Grain based distillery & 3 MW Co-

generation Power Plant

Existing Plant Area - 4.25 Ha (10.5 Acres)

6. Category of Project i.e. 'A' or 'B' Category “B” As per Notification amendment on 13th June, 2019

7. Does it attract the general

condition? If yes, please specify.

Yes, the Interstate boundary of Punjab and Haryana lies at an approx

distance of 2.2 km in ENE direction from plant site

8. Does it attract the specific

condition? If yes, please specify.

No, it does not attract the specific condition.

9. Location

Plot/Survey/Khasra No. Khata Sankhya is 310/475,337-1/514,514-1

Khasra Number is- 18//23/2/1 (1-10), 24 (4-0), 14//16 (1-0), 19/1(1-0),

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 2

S. No. Item Details

20/2(2-0), 22/2(1-0), 23 (4-0), 24 (4-0), 25(3-9), 15//21/1 (0-2), 17//1(1-7),

10(0-7), 18//6(3-17), 4/2(2-0), 5(4-0), 7(4-0), 8(4-0), 9(4-0), 13(4-0), 14 (4-0),

15(1-1), 17(4-0), 18(4-0), 2/2(1-0), 3(4-0), 4/1(2-0).

Village Haripur Hinduan & Saidupura

Tehsil Derabassi

District SAS Nagar (Mohali)

State Punjab

10. Nearest railway station/airport

along with distance in kms

Nearest Railway Station: Chandigarh (~14.0 km in NNW direction from the

plant site)

Nearest Airport: Chandigarh (~13.0 km in NW direction from the plant site)

11. Nearest Town, city, District

Headquarters along with distance

in kms.

Nearest Town: Derabassi Town (~3.5 km in West direction)

District Headquarter: Mohali (~20.0 km in NW direction from the plant site)

12. Village Panchayats, Zila Parishad,

Municipal Corporation, Local body

(complete postal addresses with

telephone nos. to be given)

Gyan Chand (Sarpanch) S/o Parsa Ram

Gram: Haripur Hinduan, Tehsil Dera Bassi, PO Ram Pur Sainia, Distt SAS

Nagar - 140507, Punjab

Phone no. - 9876535912

13. Name of the applicant M/s. Rajasthan Liquors Ltd.

14. Registered Address 7/22D, First floor, Tilak Nagar, Kanpur (UP) 208002

15. Address for correspondence:

Name Rupinder Sidhu

Designation (Owner/Partner/CEO) Operation Head

Address Village Haripur Hinduan, Barwala Road, Derabassi, District Mohali (Punjab)

Pin Code 140507

E-mail [email protected]

Telephone No. 9779558737

Fax No. ----

16. Details of Alternative Sites

examined, if any. Location of

No alternative site has been examined; as proposed expansion will be

done within the existing plant premises.

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 3

S. No. Item Details

these sites should be shown on a

toposheet.

17. Interlinked Projects Not Applicable

18. Whether separate application of

interlinked project has been

submitted?

Not Applicable

19. If yes, date of submission Not Applicable

20. If no, reason Not Applicable

21. Whether the proposal involves

approval/clearance under: if yes,

details of the same and their

status to be given.

(a) The Forest (Conservation) Act,

1980?

(b) The Wildlife (Protection) Act,

1972?

(c) The C.R.Z Notification, 1991?

No

22. Whether there is any Government

Order/ Policy relevant/ relating to

the site?

No

23. Forest land involved (hectares) No Forest land is involved.

24. Whether there is any litigation

pending against the project

and/or land in which the project is

proposed to be set up?

(a) Name of the Court

(b) Case No.

(c) Orders/directions of the

Court, if any and its relevance

with the proposed project.

No litigation is pending against the project.

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 4

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause

physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.

No.

Information / Checklist confirmation Yes /

No

Details thereof (with approximate quantities / rates,

wherever possible) with source of information data

1.1 Permanent or temporary change in

land use, land cover or topography

including increase in intensity of land

use (with respect to local land use plan)

No The proposed expansion will be done within the existing

plant premises by modernization and efficiency

improvement, therefore; there will be no permanent

change in land use. Topography of the land is flat; thus,

there will be no change in topography.

1.2 Clearance of existing land, vegetation

and buildings?

No Since the proposed expansion will be done within the

existing plant premises by modernization and efficiency

improvement; therefore, no such clearance will be

required.

1.3 Creation of new land uses? No Land use of the existing area is Industrial; since the

proposed expansion will be done within the existing plant

premises by modernization and efficiency improvement;

hence, there shall not be any creation of new land uses.

1.4 Pre-construction investigations e.g.

bore houses, soil testing?

No Pre-construction investigations have already been carried

out. Thus, it is not required for proposed expansion

project.

1.5 Construction works? No No major construction works will be carried out as the

proposed expansion will be done by modernization.

1.6 Demolition works? No There will be no demolition work.

1.7 Temporary sites used for construction

works or housing of construction

workers?

No During construction work, local people will be hired from

the nearby areas; therefore, no additional housing

facilities will be developed.

1.8 Above ground buildings, structures or

earthworks including linear structures,

cut and fill or excavations.

No There will be no excavation, cut and fill as the proposed

expansion will be done within the existing plant by

modernization in fermentation technology.

1.9 Underground works including mining

or tunneling?

No No underground works including mining or tunneling is

required.

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 5

S.

No.

Information / Checklist confirmation Yes /

No

Details thereof (with approximate quantities / rates,

wherever possible) with source of information data

1.10 Reclamation works? No No reclamation work is required.

1.11 Dredging? No No dredging is involved

1.12 Offshore structures? No Not Applicable

1.13 Production and manufacturing

processes?

Yes Grain Based Distillery process:

• Grain storage

• Grain cleaning, milling and flour handling

• Slurry preparation & liquefaction

• Fermentation

• Multi pressure distillation

• Multi Effect Evaporator & Dryer

• Alcohol daily receivers & bulk storage

1.14 Facilities for storage of goods or

materials?

No Adequate storage facilities have already been provided

within the existing plant premises; which will suffice the

requirement for proposed expansion.

1.15 Facilities for treatment or disposal of

solid waste or liquid effluents?

Yes Solid Waste

1. Fly ash generated from the boiler is being / will be

utilized for brick/Cement manufacturing.

2. DDGS will be sold as Fish, Poultry and cattle feeds.

Liquid effluent

1. Grain Slops (Spent Wash) will be taken through

Centrifuge Decanters for separation of Suspended

Solids separated as Wet Cake & will then be treated in

Multi Effect Evaporator followed by dryer.

2. Process condensate from Multi-effect evaporation

system is being/ will be treated and recycled.

1.16 Facilities for long term housing of

operational workers?

No Most of the staff will reside in nearby areas. So, there is no

need of long term housing facility.

1.17 New road, rail or sea traffic during

construction or operation?

No No new road, rail or sea traffic will be required during or

operation of the proposed expansion project.

1.18 New road, rail, air waterborne or other No No new road, rail, air waterborne or other transport

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 6

S.

No.

Information / Checklist confirmation Yes /

No

Details thereof (with approximate quantities / rates,

wherever possible) with source of information data

transport infrastructure including new

or altered routes and stations, ports,

airports etc?

infrastructure including new or altered routes and stations,

ports, airports etc. will be required.

1.19 Closure or diversion of existing

transport routes or infrastructure

leading to changes in traffic

movements?

No There will be no closure or diversion of existing transport

routes or infrastructure leading to changes in traffic

movements will be required for proposed expansion

project.

1.20 New or diverted transmission lines or

pipelines?

No No new or diverted transmission lines or pipelines are

there.

1.21 Impoundment, damming, culverting,

realignment or other changes to the

hydrology of watercourses or

aquifers?

No There will be no impoundment, damming, culverting,

realignment or other changes to the hydrology of

watercourses or aquifers.

1.22 Stream crossings? No There is no stream crossing.

1.23 Abstraction or transfers of water from

ground or surface waters?

No There will be net reduction of fresh water requirement

after this expansion project by modernization and

efficiency improvement. Total fresh water requirement will

reduce from 1200 KLPD to 1127 KLPD.

Source – Ground water

1.24 Changes in water bodies or the land

surface affecting drainage or run-off?

No There will be no change in water bodies or the land

surface affecting drainage or run-off.

1.25 Transport of personnel or materials for

construction, operation or

decommissioning?

No Transport of materials for construction and operation will

be done by existing facilities.

1.26 Long-term dismantling or

decommissioning or restoration works?

No No long-term dismantling or decommissioning or

restoration works is required.

1.27 Ongoing activity during

decommissioning which could have an

impact on the environment?

No Not Applicable

1.28 Influx of people to an area in either Yes Temporary and Permanent influx of people will be there as

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 7

S.

No.

Information / Checklist confirmation Yes /

No

Details thereof (with approximate quantities / rates,

wherever possible) with source of information data

temporarily or permanently? the staff will be recruited from different areas.

1.29 Introduction of alien species? No Introduction of alien species is not envisaged.

1.30 Loss of native species or genetic

diversity?

No No such case is reported from the area so far.

1.31 Any other actions? No Not applicable

2. Use of Natural resources for construction or operation of Project (such as land, water, materials

or energy, especially any resources which are non-renewable or in short supply).

S.

No.

Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

2.1 Land specially undeveloped or

agricultural land (ha)

No Proposed expansion will be done within the existing plant

premises.

2.2 Water (expected source & competing

users) unit KLD

No There will be net reduction of fresh water requirement

after this expansion project by modernization and

efficiency improvement. Total fresh water requirement will

reduce from 1200 KLPD to 1127 KLPD.

2.3 Minerals (MT) No No change with respect to present condition.

2.4 Construction material – stone,

aggregates, and/ soil (expected source-

MT)

No No construction material is required.

2.5 Forests and timber (source-MT) No No Forests and timber is required.

2.6 Energy including electricity and fuels

(source, competing users) Unit: fuel

(MT), energy (MW)

Yes The total power requirement after expansion will be 3 MW

which will be sourced from 3.0 MW Co-Generation power

plants.

Fuel for Boiler: Rice Husk or Coal.

2.7 Any other natural resources (use

appropriate standard units)

No Not Applicable

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 8

3. Use, storage, transport, handling or production of substances or materials, which could be harmful

to human health or the environment or raise concerns about actual or perceived risks to human

health

There will be no use, storage, transport, handling or production of such substances or materials.

S.

No.

Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

3.1 Use of substances or materials, which

are hazardous (as per MSIHC rules) to

human health or the environment (flora,

fauna, and water supplies)

Yes The hazardous chemicals used in the plant are Caustic

Soda (Sodium Hydroxide) & Sulphuric Acid. The

hazardous chemicals will be provided with proper storage

facilities as per MSIHC rules to avoid any harm to

environment or human health.

3.2 Changes in occurrence of disease or

affect disease vectors (e.g. insect or

water borne diseases)

No No such changes are envisaged.

3.3 Affect the welfare of people e.g. by

changing living conditions?

No Not Applicable

3.4 Vulnerable groups of people who could

be affected by the project e.g. hospital

patients, children, the elderly etc.,

No No effect envisaged.

3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

No solid waste will be generated due to proposed amendment project.

S.

No.

Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes No There will be no spoil, overburden or mine wastes.

4.2 Municipal waste (domestic and or

commercial wastes)

Yes Municipal solid waste generated from plant, canteen is

being / will be collected, segregated and disposed off

scientifically.

4.3 Hazardous wastes (as per hazardous

waste management rules)

Yes Used oil generated is being/ will be given to authorized

recyclers.

4.4 Other industrial process wastes No No other industrial process waste will be generated.

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 9

S.

No.

Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

4.5 Surplus product No There will be no surplus product.

4.6 Sewage sludge or other sludge from

effluent treatment

Yes Sludge is being/will be dewatered in filter press and used

as manure.

4.7 Construction or demolition wastes No There will be no construction or demolition wastes.

4.8 Redundant machinery or equipment No There will no redundant machinery or equipment.

4.9 Contaminated soils or other materials No There will not be any contaminated soils or other

materials.

4.10 Agricultural wastes No There will not be any agricultural wastes.

4.11 Other solid wastes Yes DDGS (By product) is being/ will be sold as cattle feed.

Fly ash generated from the boiler is/ will be utilized for

brick / cement manufacturers.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)

S.

No.

Information / Checklist Confirmation Yes/

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

5.1 Emissions from combustion of fossil

fuels from stationary or mobile sources

Yes The major pollutants of the plant are particulate matter

from the boiler. ESP is installed to keep the emission

levels within prescribed standards.

5.2 Emission from production processes Yes CO2 generated during the fermentation process is

being/will be recovered by CO2 scrubbers and may be

sold to beverage & packaging industry.

5.3 Emissions from materials handling

including storage or transport

No As materials transfer will be done in closed packaging/

pipe lines therefore no emission is envisaged.

5.4 Emissions from construction activities

including plant and equipment

Yes Fugitive dust emissions are likely to be generated from

construction activities and vehicular movements. These

emissions will be temporary and will be controlled by

water spraying and regular sweeping of internal roads.

5.5 Dust or odours from handling of

materials including construction

Yes Fugitive dust emissions are likely to be generated from

construction activities and vehicular movements. These

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 10

S.

No.

Information / Checklist Confirmation Yes/

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

materials, sewage and waste emissions will be temporary and will be controlled by

water spraying and regular sweeping of internal roads.

5.6 Emissions from incineration of waste No There will be no incineration of waste.

5.7 Emissions from burning of waste in

open air (e.g. slash materials,

construction debris)

No There will be no burning of waste in open air.

5.8 Emissions from any other sources No There will be no emissions from any other sources.

6. Generation of Noise and vibration, and emissions of Light and heat

There will be no generation of Noise and Vibration, and Emissions of Light and Heat due to the proposed

amendment project.

S.

No.

Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

6.1 From operation of equipment e.g.

engines, ventilation plant, crushers

Yes Due to operation of machinery, the Noise Level near the

machinery will be in the range of 75 to 80 dB (A). Proper

noise abatement measures are being/will be taken and

persons working close to machine and machine

operators are being/will be provided with personal

protective equipment viz. Ear plugs / Ear muffs/defenders

etc. for further protection.

Vibrations due to any operation are ruled out.

D.G sets is being/ will be covered with acoustic to

control. Noise level is being/will be within permissible

limit.

6.2 From industrial or similar processes Yes In the Distillery plant and Co-Generation Power Plant, the

noise will be generated due to the running of the plant

machinery. Proper mitigation measures are being / will

be taken for the reduction of noise levels viz. acoustic

enclosures etc. The workers are being / will be provided

with personal protective equipment.

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 11

S.

No.

Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

6.3 From construction or demolition No Since no demolition will be carried out in the plant

premises, there will be no noise generation.

6.4 From blasting or piling No Not Applicable

6.5 From construction or operational traffic Yes There will be some noise due to movement of vehicle in

operation phase but the same is being / will be

maintained within the prescribed limit.

6.6 From lighting or cooling systems No No noise will be generated from lighting or cooling

systems.

6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,

surface waters, groundwater, coastal wasters or the sea.

S.

No.

Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

7.1 From handling, storage, use or spillage

of hazardous materials

No The hazardous materials are being/will be stored in a

proper storage facility designed with protective measures

to avoid any risk of contamination to the land or to the

human through leakage or spillages.

7.2 From discharge of sewage or other

effluents to water or the land (expected

mode and place of discharge)

No The distillery is/ will be based on the concept of “Zero

Effluent Discharge” hence no sewage or other effluent is

being/ will be discharged outside the plant premises.

7.3 By deposition of pollutants emitted to

air into the land or into water

No Emissions are being/ will be controlled by installing

proper pollution control equipment. Hence, there will not

be any possibility of contamination of land and water by

deposition of pollutants.

7.4 From any other sources No No other sources are involved.

7.5 Is there a risk of long term build up of

pollutants in the environment from

these sources?

No There will be no long-term buildup of pollutants in the

environment, however periodic monitoring is being / will

be done for the air, water, noise and soil, so that timely

mitigation measures can be undertaken.

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 12

8. Risk of accidents during construction or operation of the project, which could affect human health

or the environment

S.

No.

Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

8.1 From explosions, spillages, fires etc and

from storage, handling, use or

production of hazardous substances

No Possibility of accident on account of explosion, spillages,

fire or hazardous substances etc. is very less. Proper

maintenance, operation and leakage proof condition of

machinery eliminates possibilities of fire.

Fire extinguishers are being / will be made available near

all machines and all persons would be properly trained

to extinguish the fire at source itself. Also, a Fire Hydrant

System has been installed in the plant to overcome the

fire situation (if any). No other major risk will be involved.

8.2 From any other causes No Not applicable

8.3 Could the project be affected by

natural disasters causing environmental

damage (e.g. floods, earthquakes,

landslides, could burst etc)?

No No such case has been reported in the area and chances

are minimal. However, the company is having Emergency

and Contingency plans in place.

9. Factors which should be considered (such as consequential development) which could lead to

environmental effects or the potential for cumulative impacts with other existing or planned

activities in the locality

S.

No.

Information / Checklist Confirmation Yes/

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

9.1 Lead to development of supporting,

facilities, ancillary development or

development stimulated by the project

which could have impact on the

environment e.g.:

• Supporting infrastructure (roads,

power supply, waste or waste water

treatment, etc.)

Yes Proposed expansion project will result in further growth

of the surrounding areas by way of increased indirect

employment opportunities in the region including

ancillary development. Greenbelt/plantation of the

surrounding area will be enhanced which will further add

on to the area aesthetically. This will contribute in the

raising the socio-economic status and standard of living

of the nearby villagers.

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 13

S.

No.

Information / Checklist Confirmation Yes/

No

Details thereof (with approximate quantities/ rates,

wherever possible) with source of information data

• Housing development

• Extractive industries

• Supply industries

• Other

9.2 Lead to after use of the site, which

could have an impact on the

environment

No Not applicable

9.3 Set a precedent for later developments Yes A better after use scenario which is likely to increase

aesthetic beauty of area and greenery would set

precedence for subsequent entrepreneurs who venture

such projects.

9.4 Have cumulative effects due to

proximity to other existing or planned

projects with similar effects

No No environmental effects or the potential for cumulative

impacts with other existing or planned activities in the

locality or in the vicinity of plant site.

(III) Environmental Sensitivity

S.

No.

Areas Name /

Identity

Approx. Aerial distance (within 15 km)

Proposed project location boundary

1. Areas protected under international

conventions, national or local legislation for

their ecological, landscape, cultural or other

related value

None Not Applicable

2. Areas which are important or sensitive for

ecological reasons - Wetlands, watercourses

or other water bodies, coastal zone,

biospheres, mountains, forests.

Yes Water Bodies –

Ghagghar River (~4.5 km in NW Direction)

Mankan Nadi (~4.5 km in NNE direction)

Mullawali Nadi (~4.5 km in NNE direction

Mattanwali Nadi (~4.5 km in NE direction)

Dangri Nadi (~6.2 km in East direction)

Nadisn Nadi (~11 km in NNE direction)

Few drains / nala are present within 15 km radius

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 14

S.

No.

Areas Name /

Identity

Approx. Aerial distance (within 15 km)

Proposed project location boundary

study area.

Forest -

Bir Dadrala PF (~3.0 km in WSW direction)

Bir Kheri PF (~3.2 km in SSW direction)

Bir Baoarpura PF (~4.5 km in WSW direction)

Bir Pir Machhela RF (~6.5 km in NNW direction)

Bir Baraul PF (~8.5 km in WSW direction)

Dariya RF (~12 km in NW direction)

Nadlan PF (~12 km in NNE direction)

Kholhai Raitan RF (~10.5 km in North direction)

Bir Hansa PF (~11 km in SW direction)

Bhoj Mataur PF (~13 km in NE direction)

3. Areas used by protected, important or

sensitive species of flora or fauna for

breeding, nesting, foraging, resting, over

wintering, migration

None Not Applicable

4. Inland, coastal, marine or underground

waters

None Not Applicable

5. State, National boundaries Yes Punjab and Haryana (~2.2 km in ENE direction)

6. Routes or facilities used by the public for

access to recreation or other tourist, pilgrim

areas

Yes NH 22 (~3.5 km in West direction)

NH 73 (~5.6 km in East direction)

NH 64 (~9.5 km in NW direction)

7. Defense installations None Not Applicable

8. Densely populated or built-up area Yes Nearest Town: Derabassi Town (~3.5 km in West

direction)

City: Chandigarh (~13.0 km in NW direction from

the plant site)

9. Areas occupied by sensitive man-made land

uses (hospitals, schools, places of worship,

community facilities)

Yes There are many primary schools, dispensaries,

small hospitals, places of worship within 15 km

from the plant site.

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 15

S.

No.

Areas Name /

Identity

Approx. Aerial distance (within 15 km)

Proposed project location boundary

10. Areas containing important, high quality or

scarce resources (Ground water resources,

surface resources, forestry, agriculture,

fisheries, tourism, minerals)

No Not Applicable

11. Areas already subjected to pollution or

environmental damage.

None Not Applicable

12. Areas susceptible to natural hazard which

could cause the project to present

environmental problems

No The project site falls in Seismic Zone – IV (High

Risk Zone) as per (based on the Vulnerability

Atlas of India – 2nd Edition, BMTPC)

(IV) Proposed Terms of Reference

Rajasthan Liquors Pvt. Ltd. is operating 120 KLPD Grain based distillery & 3.0 MW Co-generation

Power Plant at Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS

Nagar (Mohali), Punjab. Environmental Clearance was obtained from MoEFCC, New Delhi vide

letter no. J-11011/263/2010- IA II (I) dated 26th September, 2012. The company has obtained

certified compliance report from RO, MoEFCC, Chandigarh vide file no 5-299/2011/338-339 dated

20.05.2019.

The company has proposed expansion of Grain based distillery from 120 KLPD to 145.2 KLPD by

modernization in fermentation technology (Only 21% enhancement) within the existing plant. The

expansion of Grain based Distillery by modernization will involve following improvement in the

present scheme;

1. Process improvement in fermentation to achieve higher alcohol concentration and higher

efficiency.

2. Proposed expansion will be done by adding advanced enzyme and yeast.

3. Based on experience in foreign countries and improved varieties of enzymes & strains of

yeast, the company will be able to increase the concentration of alcohol from 13.7 % to 15

%.

4. Company will use the following varieties of enzymes which will be supplied by Novo which

is a Global leader in enzyme business.

Enzyme: Novo Enzyme- Saczyme 2 & Liqueflow Go.

5. Yeast (Thermosac XL & Red Ethanol) will be supplied by Lallemand Biofuels & Leaf.

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 16

6. Above all change in scheme will ensure capacity enhancement from 120 KLPD to 145.2

KLPD without adding any additional major equipment capacity in process.

7. Reduction in existing fresh water requirement Kl/KL of alcohol produced.

Highlights of the Project

No additional land is required for proposed enhancement.

No additional water requirement.

No additional storage area is required.

Proposed enhancement will be done by modernization and efficiency improvement.

Looking to the above, we request your good self to kindly consider our proposal under section

7(ii) of EIA Notification, 2006, amended from time to time and grant us EC letter for the proposed

expansion project.

(V) Undertaking

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 17

Expansion of Grain based Distillery from 120 KLPD to 145.2 KLPD by Modernization and Efficiency Improvement At Industrial FEZ, Village Haripur Hinduan & Saidupura, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab

Form - 1

M/s. Rajasthan Liquors Pvt. Ltd. 18

-=-=-=--=-