Details ongoing projects under ACA/SPA/SCA/SDS and One Time Special Assistance(as on 20/04/2017) ( Rs. in
crore)
Sl No
Implementing
Department
Name of project Executing Agency
Year/ dated
of sancti
on
Name of
Scheme
Approved
project cost
Fund sanctioned Year of
release
Fund release Utilisation Certificate submitted
UC pendi
ng
Balance
Central
Share to be releas
ed
Central Share
State Share
Central Share
State Share
Total Central share
State share
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Agriculture Repairing/maintenance of different buildings of College of Agriculture and infrastructure development of different Laboratories including class rooms.
Agri. engineeri
ng
2014-15
SPA 2.000 1.800 0.200 2014-15
1.730 1.730 0.000 0.000 1.730
2 Agriculture Installation of 500 numbers Small Bore Deep Tube Well with Submersible Pump Set in Different Locations of Tripura (Phase-II)
Agri. engineeri
ng
2014-15
SPA 12.130 10.910 1.213 2014-15
10.910 10.910 10.307 10.307
0.603
3 Agriculture Construction of 1000 MT capacity multipurpose cold storage at Machmara on Turn-Key basis including 1 (one) year operation & Maintenance
Agri. engineeri
ng
2015-16
SDS 3.340 3.340 2015-16
3.340 3.340 0.000 0.000 3.340
4 Agriculture Setting up of 2000 MT capacity multipurpose Cold Storage at Dharmanagar
Agri. engineeri
ng
2015-16
SDS 5.480 5.480 2015-16
2.740 2.740 2.740 2.740 0.000
5 Agriculture Construction of Krishi Bhawan at Pandit Neheru Complex Gorkhabasti, Agartala
Agri. engineeri
ng
2015-16
SDS 39.790 1.000 2015-16
1.000 1.000 0.000 0.000 1.000
Total: Agriculture 62.740 12.710 11.233 0.000 12.640 7.080 19.720 10.307 2.740 13.047
6.673
6 ARDD Procurement of Ambulatory Van for Veterinary College, R.K Nagar
ARDD 2012-13
SCA 0.450 0.450 2012-13
0.450 0.450 0.440 0.440 0.010
7 ARDD Vertical Extension of Second floor of Veterinary Training Institute, R.K.Nagar, West Tripura
PWD (R&B)
2013-14
SPA 1.960 1.764 0.196 2013-14
1.764 1.764 0.980 0.980 0.784
8 ARDD 10(ten) Block Level Brooder Houses (BLBH)
ARDD 2014-15
SCA 1.260 1.260 2014-15
1.260 1.260 0.000 0.000 1.260
9 ARDD Procurement of Books for Library and Laboratory Equipments under College of Veterinary Science & A.H, R.K Nagar
ARDD 2014-15
SCA 0.500 0.500 2014-15
0.500 0.500 0.370 0.370 0.130
10 ARDD Construction of Administrative-cum-Academic building (2nd phase 2nd floor middle block) and Construction of Boys & Girls hostel(1st phase-G-I) of the Establishment of Veterinary College in Tripura
PWD (R&B)
2014-15
SPA 8.500 2.250 0.250 2014-15
2.250 0.250 2.500 2.250 0.250 2.500 0.000
11 ARDD Construction of Administrative-cum-Academic building (2nd phase 2nd floor middle block) and Construction of Boys & Girls hostel(1st phase-G-I) of the Establishment of Veterinary College in Tripura (Phase-II).
PWD (R&B)
2015-16
One Tome Special Assistance
6.000 2015-16
3.000 3.000 3.000 3.000 0.000
12 ARDD Committed Expenditure of PWD for completed of works
PWD (R&B)
2016-17
SDS 2.000 2.000 2016-17
0.000 0.000 0.000
Total: ARDD 14.670 10.014 4.656 0.000 7.014 2.460 9.474 6.230 1.060 7.290 2.184
13 GA (P&S) Purchase of machineries/equipments for Government Press
GA (P&S) 2015-16
SDS 2.300 2.300 2015-16
2.300 2.300 0.850 0.850 1.450
14 GA (Printing & Stationery)
Renovation & Orientation of Machine Rooms in existing Government Press Building/SH: Construction of a 3 (three) storied building.
PWD (R&B)
2016-17
SDS 8.320 1.000 2016-17
1.000 1.000 0.000 0.000 1.000
Total: GA (Printing & Stationery)
10.620 0.000 3.300 0.000 0.000 3.300 3.300 0.000 0.850 0.850 2.450
15 Health Services
South District Hospital at Tepania in South Tripura
PWD (R&B)
2011-12
SPA 18.000 11.700 1.300 2011-12
11.700 11.700 11.700 0.000 11.700
0.000
16 Health Services
South District Hospital at Tepania in South Tripura
PWD (R&B)
2012-13
SPA 4.500 0.500 2012-13
4.500 4.500 4.500 4.500 0.000
17 Health Services
Sub-Divisional Hospital Quarter at kamalpur, Melaghar and Gandacherra in Tripura
PWD (R&B)
2011-12
SPA 15.000 13.500 1.500 2011-12
13.500 13.500 12.030 12.030
1.470
18 Health Services
G+6 Block (under construction) at IGM Hospital, Agartala
PWD (R&B)
2012-13
SPA 5.000 4.500 0.500 2012-13
4.500 4.500 4.405 4.405 0.095
19 Health Services
District Hospital at Bhagawan Nagar, Kailashahar
PWD (R&B)
2011-12
SPA 17.000 11.700 1.300 2011-12
11.700 11.700 11.700 11.700
0.000
20 Health Services
District Hospital at Bhagawan Nagar, Kailashahar
PWD (R&B)
2012-13
SPA 3.600 0.400 2012-13
3.600 3.600 2.500 2.500 1.100
21 Health Services
Construction of 100 bedded Sub-Divisional Hospital at Kamalpur / Making water supply provision, Kamalpur
PWD (R&B)
2013-14
SPA 1.990 1.792 0.199 2013-14
1.792 1.792 0.261 0.261 1.531
22 Health Services
Upgradation & Strengthening of the State Drugs Testing Laboratory (SDTL) Government of Tripura Agartala
PWD (R&B)
2013-14
SPA 1.072 0.964 0.1072 2013-14
0.964 0.964 0.856 0.856 0.108
23 Health Services
Construction of New Teaching Hospital Block-I (Dev. Of GBP Hospital)
PWD (R&B)
2012-13
SPA 65.000 18.000 2.000 2012-13
18.000 18.000 18.000 18.000
0.000
24 Health Services
Construction of New Teaching Hospital Block-I (Dev. Of GBP Hospital)
PWD (R&B)
2013-14
SPA 9.000 1.000 2013-14
9.000 9.000 9.000 9.000 0.000
25 Health Services
Construction of New Teaching Hospital Block-I (Dev. Of GBP Hospital)
PWD (R&B)
2014-15
SPA 7.477 0.830 2014-15
7.477 0.830 8.307 7.150 7.150 1.157
26 Health Services
Construction of New Teaching Hospital Block-II of AGMC and GBP Hospital
PWD (R&B)
2012-13
SPA 41.890 4.500 0.500 2012-13
4.500 4.500 4.500 4.500 0.000
27 Health Services
Construction of New Teaching Hospital Block-II of AGMC and GBP Hospital
PWD (R&B)
2014-15
SPA 4.500 0.500 2014-15
4.500 0.500 5.000 1.500 1.500 3.500
28 Health Services
Construction of New Teaching Hospital Block-II of AGMC and GBP Hospital
PWD (R&B)
2015-16
One Tome Special Assistance
20.000 2015-16
10.000 10.000 10.000 10.000
0.000
29 Health Services
Construction of Central Blood Bank
PWD (R&B)
2012-13
SPA 8.360 1.350 0.150 2012-13
1.350 1.350 1.350 1.350 0.000
30 Health Services
Construction of Central Blood Bank
PWD (R&B)
2014-15
SPA 6.174 0.686 2014-15
6.000 6.000 6.000 6.000 0.000
31 Health Services
Construction of B+G+5 Building at Cancer Hospital
PWD (R&B)
2012-13
SPA 42.790 2.700 0.300 2012-13
2.700 2.700 2.700 2.700 0.000
32 Health Services
Construction of B+G+5 Building at Cancer Hospital
PWD (R&B)
2014-15
SPA 4.500 0.500 2014-15
4.500 0.500 5.000 2.500 2.500 2.500
33 Health Services
Construction of B+G+5 Building at Cancer Hospital, Agartala.
PWD (R&B)
2015-16
One Tome Special Assistance
15.000 2015-16
7.500 7.500 7.500 7.500 0.000
34 Health Services
Construction of G+7 building at IGM Hospital on Western side
PWD (R&B)
2012-13
SPA 50.230 2.700 0.300 2012-13
2.700 0.300 3.000 2.700 0.300 3.000 0.000
35 Health Services
Construction of G+7 building at IGM Hospital on Western side
PWD (R&B)
2014-15
SPA 9.000 1.000 2014-15
9.000 1.000 10.000 3.000 3.000 7.000
36 Health Services
Construction of G+7 building at IGM Hospital on Western side, Agartala.
PWD (R&B)
2015-16
One Tome Special Assistance
20.000 2015-16
10.000 10.000 10.000 10.000
0.000
37 Health Services
Construction of Nursing Training Institute at IGM Hospital
PWD (R&B)
2012-13
SPA 32.680 1.800 0.200 2012-13
1.800 1.800 1.800 1.800 0.000
38 Health Services
Construction of Nursing Training Institute at IGM Hospital
PWD (R&B)
2014-15
SPA 4.500 0.500 2014-15
4.500 0.500 5.000 3.800 3.800 1.200
39 Health Services
Construction of Nursing Training Institute at IGM Hospital, Agartala.
PWD (R&B)
2015-16
One Tome Special Assistance
10.000 2015-16
5.000 5.000 5.000 5.000 0.000
40 Health Services
Construction of Nursing Training Institute at IGM Hospital, Agartala
PWD (R&B)
2016-17
SDS 5.000 2016-17
5.000 5.000 0.000 5.000
41 Health Services
Construction of Administrative Block at IGM Hospital
PWD (R&B)
2012-13
SPA 8.940 1.350 0.150 2012-13
1.350 1.350 1.350 1.350 0.000
42 Health Services
Construction of Administrative Block at IGM Hospital
PWD (R&B)
2014-15
SPA 4.500 0.500 2014-15
4.500 0.500 5.000 2.880 2.880 2.120
43 Health Services
Construction of 100 bedded Sub-divisional Hospital at Teliamura
PWD (R&B)
2013-14
SPA 24.500 6.300 0.700 2013-14
6.300 6.300 6.300 6.300 0.000
44 Health Services
Construction of 100 bedded Sub-divisional Hospital at Teliamura
PWD (R&B)
2014-15
SPA 5.562 0.618 2014-15
5.562 0.618 6.180 5.275 5.275 0.905
45 Health Services
Construction of 100 bedded Sub-divisional Hospital at Teliamura
PWD (R&B)
2016-17
SDS 4.000 2016-17
4.000 4.000 0.000 4.000
46 Health Services
Construction of 100 bedded Sub-divisional Hospital at Shantirbazar (Decided to be South District Hospital)
PWD (R&B)
2013-14
SPA 33.380 4.500 0.500 2013-14
4.500 4.500 4.500 4.500 0.000
47 Health Services
Construction of 100 bedded Sub-divisional Hospital at Shantirbazar (Decided to be South District Hospital)
PWD (R&B)
2014-15
SPA 4.500 0.500 2014-15
4.500 0.500 5.000 1.109 1.109 3.891
48 Health Services
Construction of 100 bedded Sub-divisional Hospital at Kanchanpur
PWD (R&B)
2011-12
SPA 19.240 4.500 0.500 2011-12
4.500 4.500 4.500 4.500 0.000
49 Health Services
Construction of 100 bedded Sub-divisional Hospital at Kanchanpur
PWD (R&B)
2014-15
SPA 6.300 0.700 2014-15
4.000 4.000 3.000 3.000 1.000
50 Health Services
Construction of 100 bedded Sub-Divisional Hospital at Kanchanpur.
PWD (R&B)
2015-16
One Tome Special Assistance
7.240 2015-16
3.620 3.620 3.620 3.620 0.000
51 Health Services
Construction of 100 bedded Sub-divisional Hospital at Amarpur
PWD (R&B)
2011-12
SPA 23.600 4.500 4.500 2011-12
4.500 4.500 4.500 4.500 0.000
52 Health Services
Construction of 100 bedded Sub-divisional Hospital at Amarpur
PWD (R&B)
2014-15
SPA 6.300 0.700 2014-15
4.500 4.500 3.000 3.000 1.500
53 Health Services
Construction of 100 bedded Sub-Divisional Hospital at Amarpur.
PWD (R&B)
2015-16
One Tome Special Assistance
11.590 2015-16
5.795 5.795 5.795 5.795 0.000
54 Health Services
Upgradation Sonamura Hospital.
PWD (R&B)
2011-12
SCA 16.500 1.000 2011-12
0.000 1.000 1.000 0.000 1.000 1.000 0.000
55 Health Services
Upgradation Sonamura Hospital.
PWD (R&B)
2016-17
SDS 1.500 2016-17
0.000 1.500 1.500 0.000 1.500 1.500 0.000
56 Health Services
Upgradation Sonamura Hospital.
PWD (R&B)
2014-15
SPA 4.500 0.500 2014-15
4.500 0.500 5.000 4.500 0.500 5.000 0.000
57 Health Services
Upgradation Sonamura Hospital.
PWD (R&B)
2015-16
One Tome Special Assistance
9.000 2015-16
4.500 4.500 4.500 4.500 0.000
58 Health Services
Purchase of MRI Macine ( Additional fund beyond Rs. 10.00 crore)
Health 2015-16
SDS 12.360 2.360 2015-16
2.360 2.360 2.360 2.360 0.000
59 Health Services
Installation of 500 KVA DG Set to ensure 24x7 power supply in GB Hospital including S.S. Block
Power 2016-17
SDS 2.200 2.200 2016-17
2.200 2.200 0.000 2.200
60 Health Services
Establishment of Cardiothoracic Vascular Surgery (CTVS) Unit at AGMC & GBP Hospital , Agartala.
Health 2016-17
SDS 1.518 1.518 2016-17
1.518 1.518 0.000 1.518
61 Health Services
Procurement of Equipments for Trauma Centre at GBP Hospital, Agartala
Health 2016-17
SDS 8.185 8.185 2016-17
8.185 8.185 0.000 8.185
62 Health Services
Supply, erection and Commissioning of 500 KVA, Air Cooled 3- phased DG set including AMF Control Panel for Cancer Hospital, Agartala
Power 2016-17
SDS 1.540 1.540 2016-17
1.540 1.540 0.000 1.540
Total: Health Services
450.974 274.100 51.443 0.000 223.411
33.051 256.461
194.782
10.160 204.942
51.520
63 FW&PM Construction of 10-bedded Primary Health Centre at Hezamara, West District
PWD (R&B)
2013-14
SPA 6.000 2.700 0.300 2013-14
1.500 1.500 1.500 1.500 0.000
64 FW&PM Construction of 10-bedded Primary Health Centre at Hezamara, West District
PWD (R&B)
2014-15
SPA 2.700 0.300 2014-15
2.700 2.700 2.400 2.400 0.300
65 FW&PM Establishment of Health Sub-Centres at 75 GP/ADC Villages
RED 2012-13
SPA 11.150 10.125 1.125 2012-13
10.125 10.125 9.970 9.970 0.155
66 FW&PM Construction of 30-bedded CHC at Srinagar, Sabroom, Souith District
PWD (R&B)
2011-12
SCA 4.000 1.000 2011-12
1.000 1.000 1.000 1.000 0.000
67 FW&PM Construction of 30-bedded CHC at Srinagar, Sabroom, Souith District
PWD (R&B)
2013-14
SPA 2.700 0.300 2013-14
2.700 2.700 1.500 1.500 1.200
68 FW&PM Construction of 10-bedded Primary Health Centre at Nidaya, Sonamura, Sepahijala
RED 2011-12
SCA 9.000 1.000 2011-12
1.000 1.000 1.000 1.000 0.000
69 FW&PM Construction of 10-bedded Primary Health Centre at Nidaya, Sonamura, Sepahijala
RED 2013-14
SPA 1.800 0.200 2013-14
1.800 1.800 1.700 0.000 1.700 0.100
70 FW&PM Construction of 10-bedded Primary Health Centre at Nidaya, Sonamura, Sepahijala
RED 2014-15
SPA 1.863 0.207 2014-15
1.863 1.863 1.863 0.000 1.863 0.000
Total: Family Welfare & PM
30.150 21.888 4.432 0.000 20.688 2.000 22.688 18.933 2.000 20.933
1.755
71 Higher Edn.
Tripura Institute of Technology (TIT), Narasinghar (Phase-II)
NBCC 2012-13
SPA
117.480
4.500 0.500 2012-13
4.500 0.500 5.000 4.500 0.500 5.000 0.000
72 Higher Edn.
Tripura Institute of Technology (TIT), Narasinghar (Phase-II)
NBCC 2014-15
SPA
9.000 1.000 2014-15
9.000 1.000 10.000 9.000 1.000 10.000
0.000
73 Higher Edn.
Construction of Tripura Institute of Technology (TIT), Narasinghar (Phase-II).
NBCC 2015-16
One Tome Special Assistance
26.410 2015-16
13.205 13.205 13.205 13.205
0.000
74 Higher Edn.
Construction of Tripura Institute of Technology at Narsingarh, Agartala
NBCC 2015-16
SDS
7.000 2015-16
7.000 7.000 7.000 7.000 0.000
75 Higher Edn.
To meet up the expenditure upto August 2016 towards construction works undertaken taken by NBCC Ltd at Tripura Institute of Technology (TIT), Narsingarh
NBCC 2016-17
SDS
10.000 2016-17
10.000 10.000 10.000 10.000
0.000
76 Higher Edn.
Construction work of Tripura Institute of Technology (Phase-II), Narsingarh, West Tripura.
NBCC 2016-17
SDS
8.508 2016-17
8.508 8.508 8.508 8.508 0.000
77 Higher Edn.
Renovation of old heritage building of MBB College
PWD (R&B)
2014-15
SCA 2.000 2.000 2014-15
2.000 2.000 1.480 1.480 0.520
78 Higher Edn.
Construction of English Medium College, Agartala (within the premises of old Central Jail)
PWD (R&B)
2013-14
SPA 51.710 0.900 0.100 2013-14
0.900 0.900 0.900 0.900 0.000
79 Higher Edn.
Construction of English Medium College, Agartala (within the premises of old Central Jail) (Phase-II)
PWD (R&B)
2014-15
SPA 4.500 0.500 2014-15
2.000 2.000 2.000 2.000 0.000
80 Higher Edn.
Construction of English Medium College, Agartala (within the premises of old Central Jail)
PWD (R&B)
2015-16
One Tome Special Assistance
35.000 2015-16
0.000 0.000 0.000 0.000
81 Higher Edn.
Vertical expansion of Academic cum Administrative building of Ambedkar College, Fatikroy
PWD (R&B)
2014-15
SPA 2.760 2.484 0.276 2014-15
1.500 1.500 1.500 1.500 0.000
82 Higher Edn.
Vertical expansion of Academic/ Administrative building (1st & 2nd floor) of DDM College, Khowai
PWD (R&B)
2014-15
SPA 5.000 4.500 0.500 2014-15
2.000 2.000 0.000 0.000 2.000
83 Higher Edn.
Construction of new Science Block at RK Mahavidyalaya, Kailashahar
PWD (R&B)
2014-15
SPA 15.000 4.500 0.500 2014-15
2.000 2.000 0.000 0.000 2.000
84 Higher Edn.
Construction of new Science Block at RK Mahavidyalaya, Kailashahar
PWD (R&B)
2015-16
One Tome Special Assistance
10.000 2015-16
0.000 0.000 0.000 0.000
85 Higher Edn.
Construction of Administrative building of NSM, Udaipur
PWD (R&B)
2014-15
SPA 6.100 1.800 0.200 2014-15
1.000 1.000 0.000 1.000
86 Higher Edn.
Construction of Polytechnic Institute at Fulkumari, Udaipur/SH: Construction of staff quarter, auditorium, gymnasium building, 100-seated boys hostel, 50 seated girls hostel and development of play ground.
PWD (R&B)
2014-15
SPA 5.000 4.500 0.500 2014-15
1.000 1.000 1.000 1.000 0.000
87 Higher Edn.
Construction of vertical expansion of BBMC(Lake side)
THCB 2014-15
SCA 1.300 1.300 2014-15
1.300 1.300 0.000 0.000 1.300
88 Higher Edn.
Setting up of a "Centre of Excellence in VLSI system design in TIT".
Higher 2015-16
SDS 13.600 1.600 2015-16
1.600 1.600 1.560 1.560 0.040
89 Higher Edn.
Construction of Administrative Building for General Degree College at Khumulwng.
PWD(R&B)
2015-16
SDS 1.500 1.500 2015-16
1.500 1.500 0.160 0.160 1.340
90 Higher Edn.
Construction of Academic Building for General Degree College at Khumulwng, Jirania.
PWD(R&B)
2012-13
SPA 6.500 2.700 0.300 012-13 2.700 2.700 2.700 2.700 0.000
91 Higher Edn.
Construction of Academic Building for General Degree College at Khumulwng, Jirania.
PWD(R&B)
2015-16
SDS 3.500 2015-16
3.500 3.500 0.840 0.840 2.660
92 Higher Edn.
Setting up of Khumulwng Polytechnic College under TFC awarded project ( for
THCB 2015-16
SDS 27.840 5.000 2015-16
5.000 5.000 5.000 5.000 0.000
completion of ongoing project)
93 Higher Edn.
Setting up of State Museum at Ujjayanta Palace, Agartala
PWD(R&B)
2012-13
SPA 16.000 6.300 0.700 2012-13
6.300 6.300 6.300 6.300 0.000
94 Higher Edn.
Setting up of State Museum at Ujjayanta Palace, Agartala
PWD(R&B)
2013-14
SPA 4.500 0.500 2013-14
4.500 4.500 4.500 4.500 0.000
95 Higher Edn.
Setting up of State Museum at Ujjayanta Palace, Agartala
PWD(R&B)
2014-15
SCA 1.000 2014-15
1.000 1.000 1.000 1.000 0.000
96 Higher Edn.
Setting up of State Museum at Ujjayanta Palace, Agartala
PWD(R&B)
2015-16
SDS 3.000 2015-16
3.000 3.000 1.500 1.500 1.500
97 Higher Edn.
Setting up MBB University, Collegetilla, Agartala (i) Auditorium Rs.1.50 crore (ii) Commerce & Management Rs.1.00 crore and (iii) Administrative Building Rs.0.25 crore) ( sanctioned Rs.2.75 crore during 2015-16 & Rs.5.66 crore during 2016-17)
PWD(R&B)
2015-16
SDS 20.870 2.750 2015-16
2.750 2.750 2.750 2.750 0.000
98 Higher Edn.
Setting up MBB University, Collegetilla, Agartala (i) Auditorium Rs.1.50 crore (ii) Commerce & Management Rs.1.00 crore and (iii) Administrative Building Rs.0.25 crore) ( sanctioned Rs.2.75 crore during 2015-16 & Rs.5.66 crore during 2016-17)
PWD(R&B)
2016-17
SDS 5.660 2016-17
1.000 1.000 0.000 1.000
99 Higher Edn.
Construction of Holy Cross College at Jubatara, Agartala, West Tripura.
Holy Cross College
2016-17
SDS 2.430 2.430 2016-17
0.900 0.900 0.400 0.400 0.500
100
Higher Edn.
Up-gradation of infrastructure of Adwaita Malla Barman Smriti Mahavidyalaya, Amarpur.
PWD(R&B)
2016-17
SDS 3.000 1.500 2016-17
0.500 0.500 0.000 0.500
101
Higher Edn.
Vertical extension of existing Academic Buildings of GDC Kamalpur.
PWD(R&B)
2016-17
SDS 3.000 1.500 2016-17
0.500 0.500 0.000 0.500
102
Higher Edn.
Construction of 1000 seated Auditorium at MBB College Campus
PWD(R&B)
2016-17
SDS 2.000 2.000 2016-17
2.000 2.000 0.000 2.000
103
Higher Edn.
Construction 1000 seated Auditorium at Ramthakur College.
PWD(R&B)
2011-12
SPA 5.500 2.250 0.250 2011-12
2.250 0.250 2.500 2.250 0.250 2.500 0.000
104
Higher Edn.
Construction 1000 seated Auditorium at Ramthakur College.
PWD(R&B)
2013-14
SPA 1.800 0.200 2013-14
1.800 0.200 2.000 1.800 0.200 2.000 0.000
105
Higher Edn.
Construction 1000 seated Auditorium at Ramthakur College.
PWD(R&B)
2016-17
SDS 1.000 2016-17
1.000 1.000 0.000 1.000
106
Higher Edn.
Construction of boundary wall at Rabindra Nath Thakur Memorial College Bishalgarh
PWD(R&B)
2016-17
SDS 0.420 2016-17
0.420 0.420 0.000 0.420
107
Higher Edn.
Construction of boundary wall at General Degree College Kamalpur
PWD(R&B)
2013-14
SPA 1.990 0.900 0.100 2013-14
0.900 0.100 1.000 0.900 0.100 1.000 0.000
108
Higher Edn.
Construction of boundary wall at General Degree College Kamalpur
PWD(R&B)
2016-17
SDS 0.990 2016-17
0.990 0.990 0.000 0.990
109
Higher Edn.
Construction of Additional Floor over the (G+3) floor for Directorate of Secondary Education and Directorate of Youth Affairs and Sports at office lane, West Tripura, District .
PWD(R&B)
2013-14
SPA 1.800 0.200 2013-14
1.800 1.800 1.800 1.800 0.000
110
Higher Edn.
Construction of Additional Floor over the (G+3) floor for Directorate of Secondary Education and Directorate of Youth Affairs and Sports at office lane, West Tripura, District .
PWD(R&B)
206-17 5.000 206-17 0.000 0.000 0.000
Total : Higher Education
310.580 128.344 73.984 0.000 57.355 56.518 113.873
52.355 42.248 94.603
19.270
111
HH&Seri Development of Tripura Handloom Handicrafts Development Corporation Complex , Agartala, West Tripura
PWD (R&B)
2013-14
SPA 8.810 2.700 0.300 2013-14
2.700 2.700 0.000 0.000 2.700
112
HH&Seri Construction of Urban Haat at Purbasha Complex, Agartala, West Tripura
PWD (R&B)
2013-14
SPA 3.840 1.656 0.184 2013-14
1.656 1.656 0.920 0.920 0.736
113
HH&Seri Construction of Sericulture Institute at Khamerbari, Champaknagar, West Tripura
RED 2016-17
SDS 4.960 0.660 2016-17
0.660 0.660 0.000 0.660
Total: Handloom Handicrafts & Seri
17.610 4.356 1.144 0.000 4.356 0.660 5.016 0.920 0.000 0.920 4.096
114
Home (Police)
Repairing of abandoned quarters at AD Nagar police lines/Gomati /Unakoti/Dhalai district
PWD (R&B)
2013-14
SPA 3.000 2.700 0.300 2013-14
2.700 2.700 2.560 2.560 0.140
115
Home (Police)
Renovation of damaged quarters at AD Nagar police lines/Gomati /Unakoti
PWD (R&B)
2013-14
SPA 2.000 1.800 0.200 2013-14
1.800 1.800 0.996 0.996 0.804
116
Home (Police)
Installation of Iron Removal Plants for 5th ,6th, 7th, 8th, 9th, 11th and 13th Bn TSR Headquarters (per unit Rs.20.00 lakh).
PWD (DWS)
2012-13
SCA 1.400 1.400 2012-13
1.400 1.400 0.580 0.580 0.820
117
Home (Police)
Installation of Iron removal Plan (IRP) for TSP battalions ( 5th -Duluma, 6th -R.C. ghat, 7th -Jampuijala, 8th - Lalcherra, 9th - Hichacherra, 11th -Pathaliaghat and 13th Kanchanpur )
PWD (DWS)
2013-14
SCA 0.400 0.400 2013-14
0.400 0.400 0.260 0.260 0.140
118
Home (Police)
Furniture for newly created 3 (three) women police stations and 65 Women Help Desk ((i) RK Pur (ii) Kailashahar (iii) Agartala and 65 other police stations )
Home (Police)
2013-14
SCA 0.200 0.200 2013-14
0.200 0.200 0.107 0.107 0.093
119
Home (Police)
Purchase of 6(six) numbers Speed Radar Gun
Home (Police)
2013-14
SCA 0.110 0.110 2013-14
0.110 0.110 0.000 0.000 0.110
120
Home (Police)
Purchase of furniture for the newly created Women Police stations at Bishalgarh under Sepahijala District
Home (Police)
2013-14
SCA 0.020 0.020 2013-14
0.020 0.020 0.010 0.010 0.010
121
Home (Police)
Construction of 40,000 Gallon capacity RCC overhead water tank at 10th Bn TSR Headquarter at Jirania
PWD (DWS)
2014-15
SCA 0.520 0.520 2014-15
0.520 0.520 0.000 0.000 0.520
122
Home (Police)
Construction of 40,000 Gallon capacity RCC overhead water tank at 1st, 3rd and 6th Bn TSR Headquarters
PWD (DWS)
2014-15
SCA 1.230 1.230 2014-15
1.230 1.230 0.000 0.000 1.230
123
Home (Police)
Construction of Boundary Wall at 1st Bn TSR Headquarter at Gakul Nagar
PWD (R&B)
2014-15
SCA 0.800 0.800 2014-15
0.800 0.800 0.000 0.000 0.800
124
Home (Police)
Repair of Iron removal Plant at 3rd Bn TSR Headquarter, Kachucherra
PWD (DWS)
2014-15
SCA 0.188 0.188 2014-15
0.188 0.188 0.000 0.000 0.188
125
Home (Police)
Installation of Deep Tube Well with Iron Removal Plant and Overhead tank at South Tripura District Police lines, Belonia
PWD (DWS)
2014-15
SCA 0.800 0.800 2014-15
0.800 0.800 0.000 0.000 0.800
126
Home (Police)
Construction of barbed wire fencing around Irani PS, Fatikroy OP and Pecherthal PS under Unakoti District
PWD (R&B)
2014-15
SCA 0.200 0.200 2014-15
0.200 0.200 0.000 0.000 0.200
127
Home (Police)
Construction of training obstacles and purchase of training equipments at A.Ch. Rama Rao Trg. Centre, R. K. Nagar
PWD (R&B)
2014-15
SCA 0.250 0.250 2014-15
0.250 0.250 0.000 0.000 0.250
128
Home (Police)
Construction of Raghna Immigration Check Post (ICP) Building with boundary wall under North Tripura District
PWD (R&B)
2014-15
SCA 0.700 0.700 2014-15
0.700 0.700 0.527 0.527 0.173
129
Home (Police)
Construction of boundary wall around Srimantapur Immigration Check Post (ICP) under Sepahijala District
PWD (R&B)
2014-15
SCA 0.150 0.150 2014-15
0.150 0.150 0.000 0.000 0.150
130
Home (Police)
Providing Small bore Tubewell in 11 TSR Camps under 3rd Bn TSR
PWD (DWS)
2014-15
SCA 0.471 0.471 2014-15
0.471 0.471 0.064 0.064 0.407
131
Home (Police)
Construction of various accommodation I.e water, electricity and sanitation etc. in interior TSR post/camps (1st Bn,2nd, 3rd Bn,5th Bn, 6th Bn,7th Bn, 8th Bn, 9th Bn,10th Bn,11th Bn, 12th Bn and 13th Bn of TSR
Home (Police)
2014-15
SCA 2.000 2.000 2014-15
2.000 2.000 1.017 1.017 0.983
132
Home (Police)
Construction of 6(six) numbers protection wall at newly established 11th BN TSR Head Quarters at Pathaliaghat, Sepahijala District”
PWD (R&B)
2015-16
SDS 0.316 0.316 2015-16
0.316 0.316 0.000 0.000 0.316
133
Home (Police)
Installation of deep tube well with iron removal plant and overhead tank at South Tripura District Police lines, Belonia, phase-II
PWD (DWS)
2015-16
SDS 0.900 0.100 2015-16
0.100 0.100 0.000 0.000 0.100
134
Home (Police)
Additional fund for completion of construction work of NGOs mess & Drill shed of Police line under Khowai District.
PWD (R&B)
2015-16
SDS 0.844 0.244 2015-16
0.244 0.244 0.000 0.000 0.244
135
Home (Police)
Maintenance & Improvement of internal road at A.D. Nagar Police line, Agartala
PWD (R&B)
2016-17
SDS 0.700 0.700 2016-17
0.700 0.700 0.000 0.700
136
Home (Police)
Calibration /technical up-gradation/ servicing of imported equipment housed in Forensic Science Laboratory (FSL) and purchase of new equipment i.e. FTIR ( Fourier Transform InfraRed), DNA kits for State FSL.
2016-17
SDS 0.250 0.250 2016-17
0.250 0.250 0.000 0.250
137
Home (Police)
Extension of HT/LT line and installation of 3(three) numbers 100KVA Distribution Transformer Sub-Station at 8th Battalion Tripura State Rifles (IR-III), Lalcharra, Chailengta, Dhalai under Manu Electrical Sub-Division.
Power 2016-17
SDS 0.480 0.480 2016-17
0.480 0.480 0.000 0.480
138
Home (Police)
Construction of 1 (one) No.10000 GPH capacity DTW with package type IRP in connection other related works at A. Ch. Rama Rao, TSR Training Centre under 2nd Bn. TSR., R.K. Nagar .
PWD (DWS)
2016-17
SDS 0.635 0.200 2016-17
0.200 0.200 0.000 0.200
139
Home (Police)
Providing 3-phase service connection for construction of HT line 0.27 Km, LT line 1.00 Km and installation of 2X100 KVA DT Sub-Station at 12th Bn.TSR, Ultacherra under Gandacherra.
Power 2016-17
SDS 0.143 0.143 2016-17
0.143 0.143 0.000 0.143
140
Home (Police)
Construction work of 40,000/- Gallon Capacity RCC Over Head Water Tank at 10th Bn. TSR Hqr., Jirania.
PWD (DWS)
2016-17
SDS 0.750 0.221 2016-17
0.221 0.221 0.000 0.221
Total: Home (Police) 19.457 4.500 12.593 0.000 4.500 12.093 16.593 3.556 2.565 6.121 10.472
141
Home (Jail) Construction of new Sub-Jail at Santirbazar
PWD (R&B)
2014015
SPA 14.770 13.290 1.329 2014015
6.060 6.060 0.000 0.000 6.060
142
Home (Jail) Provisioning of 1 separate room in Jails for Female Prisoners having children with them (In 9 jails / Sub Jails)
Home (Jail)
2014-15
SCA 1.200 1.200 2014-15
0.000 0.000 0.000 0.000 0.000
143
Home (Jail) Installation of CCTV in all Jails / Sub-Jails
Home (Jail)
2014-15
SCA 1.500 1.500 2014-15
1.500 1.500 0.000 0.000 1.500
144
Home (Jail) Installation of Mobile Jammers in Jails
Home (Jail)
2014-15
SCA 2.000 2.000 2014-15
0.000 0.000 0.000 0.000 0.000
145
Home (Jail) Construction of District Jail at Kailashahar
PWD (R&B)
2013-14
SPA 15.980 4.500 0.500 2013-14
4.500 0.500 5.000 4.500 0.500 5.000 0.000
146
Home (Jail) Construction of District Jail at Kailashahar
PWD (R&B)
2016-17
SDS 3.000 2016-17
3.000 3.000 1.630 1.630 1.370
147
Home (Jail) Construction of District Jail at Dharmanagar
PWD (R&B)
2013-14
SPA 16.212 4.500 0.500 2013-14
4.500 0.500 5.000 4.500 0.500 5.000 0.000
148
Home (Jail) Construction of District Jail at Dharmanagar
PWD (R&B)
2016-17
SDS 3.000 2016-17
3.000 3.000 3.000 3.000 0.000
Total: Home (Jail) 51.662 22.290 13.029 15.060 8.500 23.560 9.000 5.630 14.630
8.930
149
Home (Fire Services)
Up-gradation of Fire Service Training Centre at Matripally, Agartala
PWD (R&B)
2014-15
SPA 4.700 4.230 0.470 2014-15
1.650 1.650 0.650 0.650 1.000
150
Home (Fire Services)
Construction of Fire Service Station at Kamalpur
PWD (R&B)
2014-15
SCA 1.530 1.530 2014-15
1.000 1.000 1.000 1.000 0.000
151
Home (Fire Services)
Construction of Fire Service Station at Belonia
PWD (R&B)
2014-15
SCA 1.550 0.000 1.550 2014-15
0.000 0.000 0.000 0.000 0.000 0.000 0.000
152
Home (Fire Services)
Construction of Fire Service Station at Bishramganj
PWD (R&B)
2014-15
SCA 1.540 1.540 2014-15
1.430 1.430 1.430 1.430 0.000
153
Home (Fire Services)
Construction of Fire Service Station at Melagarh
PWD (R&B)
2014-15
SCA 1.500 1.500 2014-15
1.315 1.315 1.315 1.315 0.000
154
Home (Fire Services)
Construction of Fire Service Station at Mohanpur
PWD (R&B)
2014-15
SCA 1.500 1.500 2014-15
1.000 1.000 1.000 1.000 0.000
155
Home (Fire Services)
Construction of Fire Service Station at Maharaj Ganj Bazar
THCB 2014-15
SCA 1.450 1.450 2014-15
1.450 1.450 1.060 1.060 0.390
Total: Home (Fire Services)
13.770 4.230 9.540 0.000 1.650 6.195 7.845 0.650 5.805 6.455 1.390
156
ICA Development of Martyrs Memorial at Golaghati, Sepahijala District
PWD (R&B)
2014-15
SCA 6.400 6.400 2014-15
6.400 6.400 1.980 1.980 4.420
157
ICA Repair & renovation of Nazrul KalaKshetra at Agartala, West Tripura.
PWD (R&B)
2016-17
SDS 2.420 0.500 2016-17
0.500 0.500 0.000 0.500
158
ICA Development of Cultural Complex, Khowai
PWD (R&B)
2009-10
SPA 9.320 6.300 0.700 2009-10
6.300 6.300 6.300 6.300 0.000
159
ICA Development of Cultural Complex, Khowai
PWD (R&B)
2013-14
SPA 0.630 0.070 2013-14
0.630 0.070 0.700 0.630 0.070 0.700 0.000
160
ICA Development of Cultural Complex, Khowai
PWD (R&B)
2016-17
SDS 2.250 2016-17
2.250 2.250 2.250 2.250 0.000
Total: Information & Cultural Affairs
18.140 6.930 9.920 0.000 6.930 9.220 16.150 6.930 4.300 11.230
4.920
161
Industries & Commerce
Training of Youths outside the State
Industries & Commerce
2014-15
SCA 5.000 5.000 2014-15
1.000 1.000 0.000 0.000 1.000
162
Industries & Commerce
Improvement and Up-gradation of the approach road from Fire Brigade Chowmuhani to Agartala Land Custom Station by providing RCC cover drain/covering of existing drain with RCC Box Cell along Akhaura road
PWD (R&B)
2014-15
SPA 30.960 27.860 3.096 2014-15
5.000 5.000 2.400 2.400 2.600
163
Industries & Commerce
Indoor Exhibition Building at Hapania
TIDC 2016-17
SDS 55.870 10.000 2016-17
10.000 10.000 0.000 10.000
164
Industries & Commerce
Setting up of 4 new ITI s at Bishalgarh, Teliamura, LT Valley and Kamalpur (phase-II) (for procurement of tools, equipment's and machineries)
RED 2012-13
SPA 48.000 21.600 2.400 2012-13
21.600 2.400 24.000 21.600 2.400 24.000
0.000
165
Industries & Commerce
Setting up of 4 new ITI s at Bishalgarh, Teliamura, LT Valley and Kamalpur (phase-II) (for procurement of tools, equipment's and machineries)
RED 2014-15
SPA 9.000 1.000 2014-15
9.000 1.000 10.000 9.000 1.000 10.000
0.000
166
Industries & Commerce
Setting up of 4- ITI s at Bishalgarh, Teliamura, LT Valley and Kamalpur (phase-III). Total project cost Rs.48.00 crore.
RED 2016-17
SDS 5.000 2016-17
5.000 5.000 0.000 5.000
Total: Industries & Commerce
139.830 58.460 26.496 0.000 35.600 19.400 55.000 33.000 3.400 36.400
18.600
167
IT Setting up of Software Technology Park (STP) cum IT Complex at Indranagar, Agartala
TIDC 2010-11
SPA
48.980
12.150 1.350 2010-11
12.150 1.350 13.500 12.150 1.350 13.500
0.000
168
IT Setting up of Software Technology Park (STP) cum IT Complex at Indranagar, Agartala
TIDC 2013-14
SPA
17.073 1.897 2013-14
17.073 1.897 18.970 17.073 1.897 18.970
0.000
169
IT Setting up of Software Technology Park (STP) cum IT Complex at Indranagar, Agartala
TIDC 2015-16
SDS
5.000 2015-16
5.000 5.000 5.000 5.000 0.000
170
IT Setting up of Software Technology Park (STP) cum IT Complex at Indranagar, Agartala
TIDC 2016-17
SDS
5.000 2016-17
5.000 5.000 5.000 5.000 0.000
171
IT Setting up of Software Technology Park (STP)- cum-IT Park at Indranagar, Agartala
TIDC 2016-17
SDS
3.830 2016-17
3.830 3.830 0.000 0.000 3.830
Total: Information Technology (IT)
48.980 29.223 17.077 0.000 29.223 17.077 46.300 29.223 13.247 42.470
3.830
172
Labour Welfare
Construction of Shrama Bhaban at Office Lane, Agartala
PWD (R&B)
2013-14
SPA 15.760 1.800 0.200 2013-14
1.800 0.000 1.800 1.800 1.800 0.000
173
Labour Welfare
Construction of Shrama Bhaban at Office Lane, Agartala
PWD (R&B)
2016-17
SDS 5.000 2016-17
5.000 5.000 5.000 5.000 0.000
174
Labour Welfare
Construction of Shrama Bhaban at Lane, Agartala
PWD (R&B)
2016-17
SDS 2.000 2016-17
2.000 2.000 2.000 2.000 0.000
Total: Labour Welfare
15.760 1.800 7.200 0.000 1.800 7.000 8.800 1.800 7.000 8.800 0.000
175
Panchayat Construction of Auditorium at Pachayat Raj Training Institute at AD Nagar, Agartala, Tripura,
PWD (R&B)
2013-14
SPA 10.000 1.800 0.200 2013-14
1.800 0.200 2.000 1.800 0.200 2.000 0.000
176
Panchayat Construction of Auditorium at Pachayat Raj Training Institute at AD Nagar, Agartala, Tripura, phase-II
PWD (R&B)
2015-16
SDS 8.000 2015-16
4.000 4.000 0.358 0.358 3.642
Total: Panchayat 10.000 1.800 8.200 0.000 1.800 4.200 6.000 1.800 0.558 2.358 3.642
177
Power Construction of 132 KV Double Circuit Transmission line from 132 Rabindranagar sub-station to Monarchak (6 KM)
Power 2010-11
SPA 3.710 3.339 0.371 2010-11
3.339 0.371 3.710 2.620 2.620 1.090
178
Power Construction of 132 KV Double Circuit Transmission line from 132 Surjamaninagar sub-station to Monarchak (50 KM)
Power 2010-11
SPA 28.030 25.227 2.803 2010-11
25.227 2.803 28.030 11.352 11.352
16.678
179
Power Conversion of overhead lines into underground line in Agartala Municipality Area
Power 2014-15
SPA 76.480 68.832 7.648 2014-15
34.920 34.920 0.000 34.920
180
Power Setting up of 2X3.15 MVA 33/11 KV Substation in Jampuijala
Power 2014-15
SPA 4.970 4.473 0.497 2014-15
1.000 0.000 1.000 0.000 0.000 0.000 1.000
181
Power Extension of HT/LT line and 1X25 KVA & 2X16 KVA at 3-numbers small para of Khantalang near BSF camp to provide power connectivity to unelectrified para under Kanchanpur Sub-Division.
Power 2015-16
SDS 0.192 0.192 2015-16
0.192 0.192 0.192 0.192 0.000
Total: Power 113.382 101.871 11.511 0.000 64.486 3.366 67.852 13.972 0.192 14.164
53.688
182
PWD(DWS)
Completing incomplete works of construction of toilets of Individual Household Latrines (IHHL), School toilets and AWC toilets.
PWD(DWS)
2014-15
SCA 3.380 3.380 2014-15
3.380 3.380 3.147 3.147 0.233
183
PWD(DWS)
To meet up the committed liabilities of pipe materials and other works, continuing the ongoing schemes, sustaining regular maintenance works, etc. for sustainability of drinking water activitites
PWD (DWS)
2016-17
SDS 54.255 20.000 2016-17
20.000 20.000 19.220 19.220
0.780
Total: PWD(DWS) 57.635 0.000 23.380 0.000 0.000 23.380 23.380 0.000 22.367 22.367
1.013
184
PWD (R&B)
Construction of Fly Over Project
PWD (R&B)
2014-15
SPA 249.950 9.000 1.000 2014-15
9.000 0.000 9.000 9.000 0.000 9.000 0.000
185
PWD (R&B)
Construction of Fly Over Project
PWD (R&B)
2015-16
SDS 50.000 2015-16
50.000 50.000 50.000 50.000
0.000
186
PWD (R&B)
Construction of Fly Over Project
PWD (R&B)
2016-17
SDS 25.000 2016-17
25.000 25.000 25.000 25.000
0.000
187
PWD (R&B)
Construction of Fly Over Project
PWD (R&B)
2016-17
SDS 1.000 2016-17
1.000 1.000 0.000 0.000 1.000
188
PWD (R&B)
Construction of Fly Over Project
PWD (R&B)
2017-18
One Time Special Assistance
37.580 2017-18
0.000 0.000 0.000
189
PWD (R&B)
Development of Tripura Sundari Temple (Matabari) Complex at Udaipur, Gomati and Construction of Training Centre-cum-1000 seated Auditorium/building portion including internal water supply and sanitary installations. Phase-II
PWD (R&B)
2014-15
SPA 7.000 6.300 0.700 2014-15
0.000 0.000 0.000 0.000 0.000
190
PWD (R&B)
Improvement of road from South Taibandal to Gamaicherra via South Gamaicherra and Chaitanya Chowdhury Para (Length-4.60 km) under Mohanbhog RD Block, Sepahijala
PWD (R&B)
2014-15
SCA 0.210 0.000 0.210 2014-15
0.000 0.000 0.000 0.000 0.000 0.000
191
PWD (R&B)
Improvement of road from North Taibandal Church Chowmuhani to Ramcherra via Parambhaktapara and Gamaicherra (Length-4.90 km) under Mohanbhog R. D. Block, Sepahijala.
PWD (R&B)
2014-15
SCA 0.210 0.000 0.210 2014-15
0.000 0.000 0.000 0.000 0.000 0.000 0.000
192
PWD (R&B)
Extension of Circuit House at Dharmanagar
PWD (R&B)
2014-15
SCA 1.000 1.000 2014-15
0.000 0.000 0.000 0.000 0.000 0.000 0.000
193
PWD (R&B)
Improvement and Up-gradation of road from Jogendranagar to Takerjala Tri-junction (L-24.32 Km)”
PWD (R&B)
2015-16
SDS 44.380 5.000 2015-16
5.000 5.000 0.000 0.000 5.000
194
PWD (R&B)
Infrastructure Development of Gandacherra Sub-Division, Dhalai District
PWD (R&B)
2015-16
SDS 32.350 19.250 2015-16
2.300 2.300 2.300 2.300 0.000
195
PWD (R&B)
Improvement of road from Akhoura Golchakkar to Dashamighat via Joypur RCC bridge & Rajnagar High School, Agartala (L=3.10 Km)
PWD (R&B)
2015-16
SDS 3.520 3.520 2015-16
1.760 1.760 0.000 0.000 1.760
196
PWD (R&B)
Improvement of road from existing black top (starting from Shib Ram Ghat at adjacent of Kuri Cherra) to Ratan Routh Tilla via Sebak Brinda Samajik Sanstha under Kathal Tali G.P (l=790 m)/SH:- Soling, Metalling, Carpeting and other allied works.
PWD (R&B)
2015-16
SDS 0.664 0.664 2015-16
0.664 0.664 0.332 0.332 0.332
197
PWD (R&B)
Improvement of road from existing black top (starting from 28-card road at Nirmal Ghosh House) to Sabak Brinda Samajik Sanstha (upto Bishnu Paul's Shop) via Barai Para under Kathal Tali G.P (L=770 m)/SH:- Soling, Metalling, Carpeting and other allied works
PWD (R&B)
2015-16
SDS 0.362 0.362 2015-16
0.362 0.362 0.181 0.181 0.181
198
PWD (R&B)
Replacement of existing steel foot bridge by Bailey bridge over river Howrah on the road from Mani Ghosh House (near Hatat Bazaar) to river embankment at AMC ward No-40.
PWD (R&B)
2016-17
SDS 1.780 1.780 2016-17
1.780 1.780 0.000 1.780
199
PWD (R&B)
Improvement of road from Telkajla Panchayat Office to Baniacharra AWC via Nisaniamura under Mohanbhog RD Black (Minority Area)/SH: Formation, soling, metalling, carpeting, CD structure including protection wall and road side pucca drain
PWD (R&B)
2016-17
SDS 3.220 3.220 2016-17
1.500 1.500 0.000 1.500
200
PWD (R&B)
Improvement of road from Rangamura Bazar to Thambamura J.B.School via Rangamura Tribal High School (L=2.00 Km)/SH;-Metalling, carpeting, sand seal coating including protection wall, CD structure & surface drain etc/TSP area under Kathalia RD Block
PWD (R&B)
2016-17
SDS 1.160 1.160 2016-17
0.850 0.850 0.000 0.850
201
PWD (R&B)
Improvement of road from Budharai Colony to Ramcherra via Mancha Tilla l (L=3.45 Km)/Providing metalling, carpeting, protection wall side drain etc under Kathalia RD Block/ TSP area.
PWD (R&B)
2016-17
SDS 1.440 1.440 2016-17
0.900 0.900 0.000 0.900
202
PWD (R&B)
Construction / Improvement of Thalibari-Taibandal PWD road to DayalDas Tripura para (L=4.00 Km)/ formation, re-soling, metalling, carpeting and sand seal coating including protection wall, pucca drain and CD structure etc. under Kathalia RD Block, TSP area
PWD (R&B)
2016-17
SDS 1.680 1.680 2016-17
1.000 1.000 0.000 1.000
203
PWD (R&B)
“Construction of PWD road to Grantali Bejimara via Kathaliamura road under Mohanbhog RD Block (L-3.00 km)/SH: Formation,soling, metalling, carpeting, CD structure including protection wall and roadside pucca drain etc”
PWD (R&B)
2016-17
SDS 2.010 2.010 2016-17
1.500 1.500 0.000 1.500
204
PWD (R&B)
Improvement of road from NH-44, 41 Miles to Sukdev Para TSR Camp under Mungiakami Block(L-3.50 km)/SH: Metalling, carpeting, surface drain.
PWD (R&B)
2016-17
SDS 0.950 0.950 2016-17
0.950 0.950 0.000 0.950
205
PWD (R&B)
Development of Bharat Bangla Maitree Uddyan at Chottakhola.
PWD (R&B)
2016-17
SDS 1.500 1.500 2016-17
1.500 1.500 0.000 1.500
206
PWD (R&B)
Improvement of road from Kalikhala to Thalibari via Balucherra- Dhupcherra-Matanbari (L-5.50km).
PWD (R&B)
2016-17
SDS 3.400 1.360 2016-17
1.360 1.360 0.000 1.360
207
PWD (R&B)
Construction of road from Dhaliapara (Kalacherra) to Dakshin Taisama (L-3.00km).
PWD (R&B)
2016-17
SDS 2.360 0.950 2016-17
0.950 0.950 0.000 0.950
208
PWD (R&B)
Improvement of road from Uttar Manai to Dhaliapara (L-4.00 km).
PWD (R&B)
2016-17
SDS 2.680 1.070 2016-17
1.070 1.070 0.000 1.070
209
PWD (R&B)
Improvement of road from Jagatrampur Gram Panchayat office to Halampara (L-3.00km).
PWD (R&B)
2016-17
SDS 1.430 0.570 2016-17
0.570 0.570 0.000 0.570
Total: PWD(R&B) 363.256 52.880 125.606
0.000 9.000 100.016
109.016
9.000 77.813 86.813
22.203
210
PWD(WR) Construction of 100 Deep Tube Wells in different parts of Tripura
PWD(WR)
2014-15
SPA 26.840 24.160 2.680 2014-15
14.000 14.000 10.285 10.285
3.715
211
PWD(WR) Construction of bypass road for Kamalpur Town on Water Resource embankment from Revenue Dak Banglow to Sabdakar Para ( Ch.0.00 to 1860 m) and Fulchari Fish Market shed to Kamalpur Hanging Bridge ( Ch.0.00 to 1980 m) (for a total length of 3.840 Km).
PWD (WR)
2016-17
SDS 3.890 0.500 2016-17
0.500 0.500 0.000 0.500
Total: PWD(WR) 30.730 24.160 3.180 0.000 14.000 0.500 14.500 10.285 0.000 10.285
4.215
212
Rural Dev Construction of Block office building for Old Agartala RD Block, West Tripura.
RED 2013-14
SPA 1.340 0.900 0.100 2013-14
0.900 0.900 0.770 0.770 0.130
213
Rural Dev Construction of Block office building for Old Agartala RD Block, West Tripura.
RED 2014-15
SCA 0.340 2014-15
0.170 0.170 0.000 0.000 0.170
214
Rural Dev Construction of Block office building for Bharat Chandra Nagar RD Block, South Tripura.
RED 2013-14
SPA 1.340 0.900 0.100 2013-14
0.900 0.100 1.000 0.646 0.646 0.355
215
Rural Dev Construction of Block office building for Bharat Chandra Nagar RD Block, South Tripura.
RED 2014-15
SCA 0.340 2014-15
0.170 0.170 0.000 0.000 0.170
216
Rural Dev Construction of Block office building for Tepania RD Block, Gomati District.
RED 2013-14
SPA 1.340 0.900 0.100 2013-14
0.900 0.100 1.000 0.895 0.895 0.105
217
Rural Dev Construction of Block office building for Tepania RD Block, Gomati District.
RED 2014-15
SCA 0.340 2014-15
0.340 0.340 0.340 0.340 0.000
218
Rural Dev Construction of Motor stand with infrastructure development at Abhoynagar (Nalua) under Hrishyamukh RD Block, South Tripura District.
RED 2013-14
SPA 4.305 3.874 0.431 2013-14
3.874 3.874 1.940 1.940 1.934
219
Rural Dev Construction of new Teliamura Block Building under Teliamura RD Block, Khowai
RED 2013-14
SPA 1.000 0.900 0.100 2013-14
0.900 0.900 0.256 0.256 0.644
220
Rural Dev Construction of Growth Centre at Maharani under Teliamura RD Block, Khowai
RED 2013-14
SPA 0.750 0.675 0.075 2013-14
0.675 0.675 0.081 0.081 0.594
221
Rural Dev Development of Tourist Spot at newly constructed earthen dam at Chandicherra around the water body (lake) of Dhakin Taibandal ADC Village under Melagarh RD Block, Sipahijala District
RED 2013-14
SCA 1.920 0.350 2013-14
0.350 0.350 0.336 0.336 0.014
222
Rural Dev Development of Tourist Spot at newly constructed earthen dam at Chandicherra around the water body (lake) of Dhakshin Taibandal ADC Village under Melagarh RD Block, Sipahijala District,
RED 2015-16
SDS 1.570 2015-16
1.570 1.570 0.000 1.570
223
Rural Dev Construction of 14 numbers Market Stall including provision from double story & stair at Anandapur VC under Melagarh RD Block ( for un-employed youths), Sepahijala
RED 2013-14
SCA 0.130 0.130 2013-14
0.065 0.065 0.000 0.000 0.065
224
Rural Dev Creation of drinking water source using the Water of the Lake with Filtration at Chandicherra under Dakshin Taibandal VC, Mohanbhog RD Block
RED 2014-15
SCA 0.100 0.100 2014-15
0.100 0.100 0.072 0.072 0.028
225
Rural Dev Construction of 375 seated Community Hall at Grantali GP under Mohanbhog RD Block
RED 2014-15
SCA 0.350 0.350 2014-15
0.350 0.350 0.200 0.200 0.150
226
Rural Dev Renovation of Power Supply System for Mohanbhog & Kathalia RD Block
RED 2014-15
SCA 1.500 1.500 2014-15
1.500 1.500 0.000 0.000 1.500
227
Rural Dev Construction of road from Ambassa- Gandacherra road to Udaisingh Para SH : Supplying of steel bailey bridge (130 ft0 in / c launching and erection of same over Khowai river at Katanjoy Para at Ch . 4.42 Km. from Ambassa- Gandacherra road to Udaisingh para
RED 2014-15
SCA 0.880 0.880 2014-15
0.440 0.440 0.000 0.440
228
Rural Dev Construction of RCC roof structured market shed at Subhash Colony, Chandul ADC Village, under Mohanbhog RD Block.
RED 2014-15
SCA 0.367 0.367 2014-15
0.184 0.184 0.000 0.184
229
Rural Dev Construction of RCC roof structured market shed at Uttar Taibandal ADC Village, under Mohanbhog RD Block.
RED 2014-15
SCA 0.609 0.609 2014-15
0.305 0.305 0.000 0.305
230
Rural Dev Facilitation Centre at Hudco Colony under Purba Chandigar GP under Mohanbhog RD Block
RED 2014-15
SCA 0.810 0.810 2014-15
0.405 0.405 0.160 0.160 0.245
231
Rural Dev Construction of steel foot bridge access the islands at Chandicherra Earthen Dam at Dakshin Taibandal ADC Village
RED 2014-15
SCA 0.300 0.300 2014-15
0.300 0.300 0.000 0.000 0.300
232
Rural Dev Development of Jirania Market (Double storied )
RED 2014-15
SCA 1.706 1.706 2014-15
1.706 1.706 1.279 1.279 0.427
233
Rural Dev Construction of Auditorium ( 750 seat capacity ) at Lembucherra,
RED 2014-15
SCA 1.248 1.248 2014-15
1.248 1.248 0.500 0.500 0.748
234
Rural Dev Construction of RCC two cell Box Culvert (6X7) mtr. over Duluma Cherra nearby Nabinroy High School, Paharpur VC under Amarpur RD Block.
RED 2015-16
SDS 0.600 0.600 2015-16
0.600 0.600 0.000 0.600
235
Rural Dev Development of Sabroom Super Market, South Tripura
RED 2012-13
SCA 4.180 1.000 1.000 1.000 1.000 1.000 0.000
236
Rural Dev Development of Sabroom Super Market, South Tripura
RED 2015-16
SDS 3.180 2015-16
3.180 3.180 1.220 1.220 1.960
237
Rural Dev Developing Conference Hall at Belonia Circuit House, Belonia
RED 2015-16
SDS 0.270 0.270 2015-16
0.270 0.270 0.000 0.270
238
Rural Dev Construction of Market/Supermarket at Chailengta under LTV Sub-Division: (i) Construction of double storied market stall and open shed at Chailengta Bazar(Ground Floor) i/c all other component works -Phase-I
RED 2015-16
SDS 2.470 2.470 2015-16
2.470 2.470 0.000 2.470
239
Rural Dev Infrastructure Development of Birchandra Nagar Market under South Tripura District
RED 2015-16
SDS 2.500 2.500 2015-16
1.250 1.250 0.000 1.250
240
Rural Dev Construction of Mohanbhog Block building under RD Bishramganj Division, sepahijala District
RED 2013-14
SPA 3.270 0.900 0.100 2013-14
0.900 0.100 1.000 0.900 0.100 1.000 0.000
241
Rural Dev Construction of Mohanbhog Block building under RD Bishramganj Division, sepahijala District
RED 2014-15
SCA 0.340 2014-15
0.340 0.340 0.340 0.340 0.000
242
Rural Dev Construction of Mohanbhog Block building under RD Bishramganj Division, sepahijala District
RED 2016-17
SDS 1.930 2016-17
1.930 1.930 0.580 0.580 1.350
243
Rural Dev Construction of 2-(two) storied Market/ Shed at Manu Bazar, South Tripura
RED 2016-17
SDS 3.180 2.130 2016-17
2.130 2.130 0.000 2.130
244
Rural Dev Construction of Boundary Wall for Mungiakami Block Office
RED 2016-17
SDS 0.396 0.150 2016-17
0.150 0.150 0.000 0.150
Total: Rural Development
36.861 9.049 26.516 0.000 9.049 22.821 31.870 5.488 6.127 11.614
20.256
245
Revenue Construction of Multipurpose Hall at Tlansang under Jampui Hill RD Block, North Tripura
RED 2012-13
SCA 0.560 0.500 2012-13
0.500 0.500 0.248 0.248 0.252
246
Revenue Construction of Multipurpose Hall at Tlansang under Jampui Hill RD Block, North Tripura
RED 2013-14
SCA 0.055 2013-14
0.055 0.055 0.055 0.055 0.000
247
Revenue Construction of Motor Stand at Mohanpur under Mohanpur RD Block, West Tripura
RED 2013-14
SPA 1.855 1.670 0.186 2013-14
1.670 0.186 1.856 0.000 1.856
248
Revenue Up-gradation of Kakraban PHC from 10 bedded to 50 bedded capacity Hospital under Kakraban RD Block, Gomati
RED 2013-14
SPA 1.200 1.080 0.120 2013-14
1.080 1.080 0.000 0.000 1.080
249
Revenue Procurement of 10 (ten) numbers of satellite phones for use of DM & Collectors, DGP and Chief Secretary under Disaster Management
Revenue 2013-14
SCA 0.160 0.160 2013-14
0.080 0.080 0.000 0.000 0.080
250
Revenue Integrated Area Development of Chawmanu Market under Chawmanu RD Block, Dhalai
RED 2013-14
SCA 0.100 0.100 2013-14
0.100 0.100 0.000 0.000 0.100
251
Revenue Procurement of 990 numbers joint benches for 36 number schools under Unakoti District (990 X Rs. 2600.00)
RED 2013-14
SCA 0.257 0.257 2013-14
0.257 0.257 0.129 0.129 0.129
252
Revenue Construction of Conference Hall in the Circuit House at Kailashahar, Unakoti District
RED 2013-14
SCA 0.245 0.245 2013-14
0.245 0.245 0.123 0.123 0.122
253
Revenue Construction of Jampuijala Sub-Divisional Magistrate office,
RED 2014-15
SPA 5.000 4.500 0.500 2014-15
3.000 3.000 2.820 2.820 0.180
254
Revenue Construction of 2(two) storied building for SDM Office at Amarpur under Gomati District
RED 2014-15
SPA 5.430 4.890 0.540 2014-15
3.000 3.000 2.457 2.457 0.543
255
Revenue Construction of Multi Storied Market Complex at Amtali Bazar under Dukli Block
RED 2014-15
SPA 6.680 6.010 0.670 2014-15
4.000 4.000 2.000 2.000 2.000
256
Revenue Construction of Sub-Divisional Magistrate office Building at Khowai, Khowai District
RED 2011-12
SCA 6.710 2.000 2011-12
2.000 2.000 2.000 2.000 0.000
257
Revenue Construction of Sub-Divisional Magistrate office Building at Khowai, Khowai District
RED 2016-17
SDS 2.830 2016-17
1.500 1.500 0.000 1.500
258
Revenue Construction of Sub-Divisional Magistrate Office building at Karbook.
RED 2016-17
SDS 5.430 1.000 2016-17
1.000 1.000 1.000 1.000 0.000
259
Revenue Construction of double storied cultural hall at Chirakuti village under Gournagar RD Block
RED 2016-17
SDS 1.970 0.970 2016-17
0.970 0.970 0.500 0.500 0.470
260
Revenue Construction of 24 seated ST boys hostel at Ramkrishna Siksha Pratisthan, Kailashahar.
RED 2013-14
SPA 0.690 0.450 0.050 2013-14
0.450 0.050 0.500 0.450 0.050 0.500 0.000
261
Revenue Construction of 24 seated ST boys hostel at Ramkrishna Siksha Pratisthan, Kailashahar.
RED 2016-17
SDS 0.190 2016-17
0.190 0.190 0.150 0.150 0.040
262
Revenue Construction of ST boys hostel at Pecharthal H.S. School under Pecharthal RD Block
RED 2013-14
SCA 0.484 0.400 2013-14
0.400 0.400 0.400 0.400 0.000
263
Revenue Construction of ST boys hostel at Pecharthal H.S. School under Pecharthal RD Block
RED 2016-17
SDS 0.084 2016-17
0.084 0.084 0.060 0.060 0.024
Total: Revenue 36.771 18.600 10.857 0.000 13.200 7.617 20.817 7.727 4.715 12.442
8.375
264
S.T Envi Construction of Vigyan Gram (Science City) at Agartala Tripura
PWD (R&B)
2012-13
SPA 31.790 4.500 0.500 2012-13
4.500 0.500 5.000 4.500 0.500 5.000 0.000
265
S.T Envi Construction of Vigyan Gram (Science City) at Agartala Tripura
PWD (R&B)
2013-14
SPA 4.500 0.500 2013-14
4.500 0.500 5.000 4.500 0.500 5.000 0.000
266
S.T Envi Construction of Vigyan Gram (Science City) at Agartala Tripura
PWD (R&B)
2014-15
SPA 9.000 1.000 2014-15
9.000 1.000 10.000 3.665 1.000 4.665 5.335
267
S.T Envi Acquisition of land for Vigyan Gram (Science City)
S.T Envi 2016-17
SDS 1.250 2016-17
1.250 1.250 0.000 1.250
268
S.T Envi Acquisition of Land for Vigyan Gram (Science City)
S.T Envi 2016-17
SDS 1.450 2016-17
1.450 1.450 0.000 1.450
Total: Science Technology & Envi.
31.790 18.000 4.700 0.000 18.000 4.700 22.700 12.665 2.000 14.665
8.035
269
Elementary Edn.
Purchase for Furniture & Utensils and Inauguration Programme for the newly built Hostel attached to Tillabazar Islamia H.S. (Fazil) Madrassa, Kailashahar
Elementary Edn.
2016-17
SDS 0.350 0.350 2016-17
0.350 0.350 0.000 0.350
Total: Elementary Education
0.350 0.000 0.350 0.000 0.000 0.350 0.350 0.000 0.000 0.000 0.350
270
Secondary Edn
Upgradation of infrastructure of Manu Higher Secondary School, Subroom, South Tripura
PWD (R&B)
2009-10
SPA 4.000 3.600 0.400 2009-10
3.600 0.000 3.600 1.800 1.800 1.800
271
Secondary Edn
Up-gradation of Infrastructure of Prachyabharati H.S.School, Agartala (phase-1)
THCB 2010-11
SPA 7.540 4.500 0.500 2010-11
4.500 4.500 4.220 4.220 0.280
272
Secondary Edn
Up-gradation of Infrastructure of Prachyabharati H.S.School, Agartala (phase-1)
THCB 2013-14
SPA 0.450 0.050 2013-14
0.450 0.050 0.500 0.450 0.050 0.500 0.000
273
Secondary Edn
Construction of Prachya Bharati H.S School at Agartala, S/H: Construction of 2nd phase work in the First Floor (FF) of East side block and Ground Floor (GF) & First Floor (FF) block of Western side
THCB 2015-16
SDS 7.077 7.077 2015-16
7.077 7.077 0.000 7.077
274
Secondary Edn
Construction of Prachya Bharati H.S School at Agartala, S/H: Construction of boundary wall & gril in front of ground floor of newly constructed school building and one campus hall.
THCB 2015-16
SDS 0.464 0.464 2015-16
0.464 0.464 0.000 0.464
275
Secondary Edn
Up-gradation of Infrastructure of Arjya Colony H.S School at Belonia, South Tripura
PWD( R&B)
2012-13
SPA 6.550 0.900 0.100 2012-13
0.900 0.900 0.830 0.830 0.070
276
Secondary Edn
Up-gradation of Infrastructure of Arjya Colony H.S School at Belonia, South Tripura
PWD( R&B)
2013-14
SPA 0.945 0.105 2013-14
0.945 0.945 0.945 0.945 0.000
277
Secondary Edn
Upgradation of Infrastructure of Arjya Colony H.S School, Belonia, South Tripura District.
PWD( R&B)
2015-16
One Tome Special Assistance
4.500 2015-16
2.000 2.000 0.950 0.950 1.050
278
Secondary Edn
Construction of Rajnagar H.S.School, at Rajnagar, Belonia, South Tripura (Phase-1)
PWD( R&B)
2012-13
SPA 3.970 0.900 0.100 2012-13
0.900 0.900 0.825 0.825 0.075
279
Secondary Edn
Construction of Rajnagar H.S.School, at Rajnagar, Belonia, South Tripura (Phase-11)
PWD( R&B)
2013-14
SPA 0.495 0.055 2013-14
0.495 0.055 0.550 0.495 0.055 0.550 0.000
280
Secondary Edn
Construction of 100 capacity Boys Hostel for Daodarani Fazil H.S. Madrassa, Sonamura, Sepahijala District / Tilla Bazar Fazil H.S. Madrassa, Kailashahar, Unakoti / Bishalgarh Madrassa, Sepahijala District, Tripura
RED 2012-13
SPA 3.000 2.700 0.300 2012-13
2.700 0.300 3.000 2.230 2.230 0.770
281
Secondary Edn
Up-gradation of infrastruction of Dharmanagar Govt. Girls' H. S. School , Dharmanagar, Noth Tripura.
PWD (R&B)
2006-07
ACA 7.200 1.917 0.210 2006-07
1.917 0.210 2.127 1.917 0.210 2.127 0.000
282
Secondary Edn
Up-gradation of infrastruction of Dharmanagar Govt. Girls' H. S. School , Dharmanagar, Noth Tripura.
PWD (R&B)
2012-13
SPA 4.050 0.450 2012-13
4.050 0.000 4.050 2.980 2.980 1.070
283
Secondary Edn
Construction of MTB Girl's H. S. School
PWD (R&B)
2012-13
SPA 3.500 2.250 0.250 2012-13
2.250 0.250 2.500 2.250 0.250 2.500 0.000
284
Secondary Edn
Construction of MTB Girl's H. S. School ( phase-II).
PWD (R&B)
2013-14
SPA 0.900 0.100 2013-14
0.900 0.900 0.500 0.500 0.400
285
Secondary Edn
Construction of Dr. B. R. Ambedkar High School, at Joynagar, Agartala / S.H. 1st floor of North Block
THCB 2008-09
ACA 7.380 4.680 0.520 2008-09
4.680 0.520 5.200 4.680 0.520 5.200 0.000
286
Secondary Edn
Construction of Dr. B. R. Ambedkar High School, at Joynagar, Agartala / S.H. 1st floor of North Block (Phase-II).
THCB 2012-13
SPA
1.962 0.218 2012-13
1.962 0.218 2.180 1.199 1.199 0.981
287
Secondary Edn
Construction of a New Block for Bijoy Kumar Girl's H.S School including Campus Hall at Agartala, West Tripura
PWD (R&B)
2012-13
SPA 8.740 1.800 0.200 2012-13
1.800 0.200 2.000 1.450 0.000 1.450 0.550
288
Secondary Edn
Construction of a New Block for Bijoy Kumar Girl's H.S School including Campus Hall at Agartala, West Tripura
PWD (R&B)
2013-14
SPA 0.990 0.110 2013-14
0.850 0.850 0.650 0.650 0.200
289
Secondary Edn
Upgradation of Infrastructure of Bijoy Kumar Girls School, Agartala, West Tripura.
PWD( R&B)
2015-16
One Tome Special Assistance
2.900 2015-16
1.950 1.950 1.950 1.950 0.000
290
Secondary Edn
Construction of Auditorium Building at St. Paul’s H.S. School, Arundhutinagar, Agartala,
THCB 2012-13
SPA 4.610 1.350 0.150 2012-13
1.350 1.350 0.000 0.000 1.350
291
Secondary Edn
Construction of Auditorium Building at St. Paul’s H.S. School, Arundhutinagar, Agartala,
THCB 2013-14
SPA 1.350 0.150 2013-14
1.350 1.350 0.000 0.000 1.350
292
Secondary Edn
Up gradation of infrastructure of Mohanbhog High School at Melagarh, Sepahijala District
PWD( R&B)
2013-14
SPA 5.120 0.900 0.100 2013-14
0.900 0.100 1.000 0.000 0.000 1.000
293
Secondary Edn
Construction of Mohanbhog High School at Sonamura, Sepahijala (phase-II)
PWD (R&B)
2014-15
SCA 1.000 2014-15
1.000 1.000 0.000 0.000 1.000
294
Secondary Edn
Up gradation of infrastructure of Jampui H.S School, Jampui Block North Tripura District
PWD( R&B)
2013-14
SPA 4.000 0.900 0.100 2013-14
0.450 0.000 0.450 0.450 0.450 0.000
295
Secondary Edn
Up gradation of infrastructure of Belkumbari H.S School, Gournagar RD Block under Unakoti District
PWD( R&B)
2013-14
SPA 4.000 0.900 0.100 2013-14
0.450 0.000 0.450 0.450 0.450 0.000
296
Secondary Edn
Infrastructure Development of Vivekananda Vidyapith Higher Secondary School, Udaipur, Gomati District
RED 2013-14
SPA 4.00 1.539 0.170 2013-14
1.539 0.170 1.709 0.770 0.770 0.940
297
Secondary Edn
Up gradation of infrastructure of Khowai Government Girls Higher Secondary School under Khowai District
THCB 2013-14
SPA 10.000 1.800 0.200 2013-14
0.900 0.900 0.900 0.900 0.000
298
Secondary Edn
Up gradation of infrastructure of Khowai Government Girls Higher Secondary School under Khowai District .
THCB 2015-16
One Tome Special Assistance
8.000 2015-16
3.000 3.000 3.000 3.000 0.000
299
Secondary Edn
Up gradation of infrastructure of Chandrapur Colony Higher Secondary School Udaipur under Gomati District
THCB 2013-14
SPA 4.00 1.350 0.150 2013-14
1.350 0.150 1.500 1.175 1.175 0.325
300
Secondary Edn
Up gradation of infrastructure of Subhasnagar Higher Secondary School under Sepahijala District
THCB 2013-14
SPA 5.000 0.900 0.100 2013-14
0.900 0.100 1.000 0.000 0.000 1.000
301
Secondary Edn
Up gradation of infrastructure of Golaghati High School Bishalgarh under Sepahijala District
THCB 2013-14
SPA 5.810 0.900 0.100 2013-14
0.900 0.100 1.000 0.900 0.900 0.100
302
Secondary Edn
Up gradation of infrastructure of Golaghati High School Bishalgarh under Sepahijala District.
THCB 2015-16
One Tome Special Assistance
4.810 2015-16
2.405 2.405 2.405 2.405 0.000
303
Secondary Edn
Up gradation of infrastructure of Ramkrishna Vidyamandir, Gangail Road Agartala under West District
THCB 2013-14
SPA 7.940 0.900 0.100 2013-14
0.900 0.100 1.000 0.000 0.000 1.000
304
Secondary Edn
Up gradation of infrastructure of Baidyerdighi Higher Secondary School Bishalgarh under Sepahijala District Tripura
THCB 2013-14
SPA 5.000 0.900 0.100 2013-14
0.800 0.800 0.800 0.800 0.000
305
Secondary Edn
Up gradation of infrastructure of Baspukur Senior Madrassa and Hostel Sonamura under Sepahijala District Tripura
RED 2013-14
SPA 1.756 1.581 0.175 2013-14
0.790 0.790 0.790 0.790 0.000
306
Secondary Edn
Up gradation of infrastructure of Narsingharh Higher Secondary School under West District Tripura
THCB 2013-14
SPA 7.500 1.350 0.150 2013-14
1.350 0.150 1.500 1.175 1.175 0.325
307
Secondary Edn
Up gradation of infrastructure of Arundhuti Nagar English Medium School Arundhuti Nagar under West District
THCB 2013-14
SPA 10.640 0.900 0.100 2013-14
0.900 0.100 1.000 0.450 0.000 0.450 0.550
308
Secondary Edn
Up gradation of infrastructure of Bishalgarh Office Tilla Higher Secondary School Bishalgarh under Sepahijala District Tripura
THCB 2013-14
SPA 9.000 0.900 0.100 2013-14
0.850 0.000 0.850 0.850 0.000 0.850 0.000
309
Secondary Edn
Up gradation of infrastructure of Bishalgarh Office Tilla Higher Secondary School Bishalgarh under Sepahijala District Tripura.
THCB 2015-16
One Tome Special Assistance
8.000 2015-16
3.000 3.000 3.000 3.000 0.000
310
Secondary Edn
Upgradation of Infrastructure of 100 capacity Boys' Hostel for Bishalgarh High Madrassa, Bishalgarh, Sepahijala.
RED 2013-14
SPA 0.550 0.495 0.055 2013-14
0.495 0.055 0.550 0.495 0.000 0.495 0.055
311
Secondary Edn
Up-gradation of infrastructure 50 Seated Hostel for Bishnupriya Manipuri Boys,Rajbari, Dharmanagar, North Tripura.
RED 2012-13
SCA 1.000 0.500 2012-13
0.500 0.500 0.500 0.500 0.000
312
Secondary Edn
Up-gradation of infrastructure 50 Seated Hostel for Bishnupriya Manipuri Boys,Rajbari, Dharmanagar, North Tripura.
RED 2013-14
SPA 0.450 0.050 2013-14
0.450 0.050 0.500 0.250 0.000 0.250 0.250
313
Secondary Edn
Up-gradation of Bagafa Ashram H.S. School, Santirbazar Sub-Division, South Tripura
THCB 2013-14
SPA 1.000 0.900 0.100 2013-14
0.900 0.000 0.900 0.500 0.000 0.500 0.400
314
Secondary Edn
Upgradation of 100 Seated Boys' Hostel for Baspukur Sr. Islamia Madrassa, Kathalia, West Tripura.
RED 2012-13
SCA 2.330 1.000 2012-13
1.000 1.000 1.000 1.000 0.000
315
Secondary Edn
Upgradation of 100 Seated Boys' Hostel for Baspukur Sr. Islamia Madrassa, Kathalia, West Tripura.
RED 2013-14
SPA 1.197 0.133 2013-14
1.065 0.000 1.065 0.000 0.000 0.000 1.065
316
Secondary Edn
Upgradation of Infrastructure of boundary wall, site development & internal road with dranage system of Shishu Bihar School, Agartala, West Tripura
PWD (R&B)
2013-14
SPA 1.000 0.900 0.100 2013-14
0.900 0.000 0.900 0.500 0.000 0.500 0.400
317
Secondary Edn
Upgradation of infrastructure of Umakanta HS School at Agartala
PWD (R&B)
2011-12
SCA 16.000 0.500 2011-12
0.500 0.500 0.500 0.500 0.000
318
Secondary Edn
Upgradation of infrastructure of Umakanta HS School at Agartala (Phase-II)
PWD (R&B)
2014-15
SPA 14.400 1.600 2014-15
3.000 0.000 3.000 2.000 0.000 2.000 1.000
319
Secondary Edn
Upgradation of Kamalpur K.C Girls Higher Secondary School, Kamalpur, Dhalai
PWD (R&B)
2014-15
SPA 5.000 4.500 0.500 2014-15
2.000 0.000 2.000 0.000 0.000 0.000 2.000
320
Secondary Edn
Construction of Triple-storied New Block at Northern side of Netaji Subhas Vidyaniketan, Agartala
PWD (R&B)
2014-15
SPA 8.400 7.560 0.840 2014-15
5.000 0.000 5.000 2.000 0.000 2.000 3.000
321
Secondary Edn
Construction of Taibandal HS School at Taibandal, Sonamura Sub-Division, Sepahijala
PWD (R&B)
2013-14
SPA 13.530 1.800 0.200 2013-14
1.800 1.800 1.800 1.800 0.000
322
Secondary Edn
Construction of Taibandal HS School at Taibandal, Sonamura Sub-Division, Sepahijala
PWD (R&B)
2014-15
SPA 7.677 0.853 2014-15
3.500 0.000 3.500 3.500 0.000 3.500 0.000
323
Secondary Edn
Construction of Taibandal HS School at Taibandal, Sonamura Sub-Division, Sepahijala (phase-II)
PWD (R&B)
2015-16
Onr Time Special assistance
3.000 2015-16
1.500 1.500 1.500 1.500 0.000
324
Secondary Edn
Upgradation of infrastructure of Sonamura Girls Higher Secondary School, Sonamura, West Tripura
PWD (R&B)
2007-08
ACA 9.500 4.536 0.504 2007-08
4.536 4.536 2.500 2.500 2.036
325
Secondary Edn
Upgradation of infrastructure of Sonamura Girls Higher Secondary School, Sonamura, West Tripura
PWD (R&B)
2012-13
SCA 0.500 2012-13
0.500 0.500 0.500 0.500 0.000
326
Secondary Edn
Upgradation of infrastructure of Sonamura Girls Higher Secondary School, Sonamura, West Tripura
PWD (R&B)
2014-15
SCA 2.520 2014-15
2.520 2.520 2.520 2.520 0.000
327
Secondary Edn
Upgradation of infrastructure of Sonamura Girls Higher Secondary School, Sonamura, West Tripura
PWD (R&B)
2015-16
SDS 1.000 2015-16
1.000 1.000 1.000 1.000 0.000
328
Secondary Edn
Up-gradation of infrastructure of Kanchanpur H.S School, Kanchanpur,
PWD (R&B)
2008-09
ACA 4.000 3.600 0.400 2008-09
3.600 3.600 2.098 2.098 1.502
329
Secondary Edn
Construction of St.John's High School (Private School), Killa, Udaipur ( boundary wall around the boys & girls hostels)
RED 2012-13
SCA 0.302 0.302 2012-13
0.302 0.302 0.000 0.000 0.302
330
Secondary Edn
Upgradation of Darul Ullom Junior Madrasa, Rajdharnagar,Udaipur, Gomati
RED 2012-13
SCA 0.150 0.150 2012-13
0.150 0.150 0.000 0.000 0.150
331
Secondary Edn
Construction of 20 Nos. Madrassa Buildings.
RED 2012-13
SCA 3.000 3.000 2012-13
3.000 3.000 0.000 3.000
332
Secondary Edn
Upgradation of Karaliamura Jr. Madrassa, Sonamura , Sepajijala.
RED 2013-14
SCA 0.166 0.166 2013-14
0.166 0.166 0.000 0.000 0.166
333
Secondary Edn
Uniform grant to students of State Government aided Schools in Tripura
Secondary Edn.
2013-14
SCA 0.552 0.552 2013-14
0.552 0.552 0.214 0.214 0.338
334
Secondary Edn
Construction of School building of Nishi Kumar Murasing Para Class XII School, South Tripura
RED 2011-12
SPA 1.540 0.990 0.110 2011-12
0.990 0.990 0.990 0.990 0.000
335
Secondary Edn
Construction of School building of Nishi Kumar Murasing Para Class XII School, South Tripura
RED 2013-14
SCA 0.215 2013-14
0.215 0.215 0.215 0.215 0.000
336
Secondary Edn
Construction of School building of Nishi Kumar Murasing Para Class XII School, South Tripura
RED 2014-15
SCA 0.220 2014-15
0.220 0.220 0.000 0.000 0.220
337
Secondary Edn
Purchase land for shifting of N.C. Institution, Sonamura to Dhaliai, NP ward no-5 in a jote land measuring 05 kani.
Seconday Edn
2014-15
SCA 2.300 2.300 2014-15
2.300 2.300 1.864 1.864 0.436
338
Secondary Edn
Construction of Bhabhanipur H.S. School, Kathalia (construction should be made in new site)
PWD (R&B)
2014-15
SCA 1.000 1.000 2014-15
1.000 1.000 0.000 0.000 1.000
339
Secondary Edn
Renovation works at Padmapur HS School at Dharmanagar for opening of Kendriya Vidyalaya
PWD (R&B)
2014-15
SCA 0.150 0.150 2014-15
0.150 0.150 0.000 0.000 0.150
340
Secondary Edn
Side development of the proposed Kendriya Vidyalaya at East Hurua, North Tripura
PWD (R&B)
2016-17
SDS 0.246 0.246 2016-17
0.246 0.246 0.000 0.000 0.246
341
Secondary Edn
Construction of new School building for Lankamura HS School , West Tripura
THCB 2014-15
SCA 10.000 1.000 2014-15
1.000 1.000 0.000 0.000 1.000
342
Secondary Edn
Upgradation of infrastructure for Ramesh H.S. School at Udaipur, Gomati
PWD (R&B)
2008-09
ACA 5.770 3.940 0.420 2008-09
3.940 3.940 3.940 3.940 0.000
343
Secondary Edn
Upgradation of infrastructure for Ramesh H.S. School at Udaipur, Gomati
PWD (R&B)
2012-13
SCA 1.000 2012-13
1.000 1.000 1.000 1.000 0.000
344
Secondary Edn
Upgradation of infrastructure for Ramesh H.S. School at Udaipur, Gomati
PWD (R&B)
2014-15
SCA 1.000 2014-15
1.000 1.000 0.000 0.000 1.000
345
Secondary Edn
Construction of building for Laljuri H.S.School at Kanchanpur, North Tripura
PWD (R&B)
2013-14
SPA 9.170 0.900 0.100 2013-14
0.900 0.000 0.900 0.900 0.900 0.000
346
Secondary Edn
Construction of building for Laljuri H.S.School at Kanchanpur, North Tripura (phase-II)
PWD (R&B)
2014-15
SCA 1.000 2014-15
1.000 1.000 0.000 0.000 1.000
347
Secondary Edn
Construction of Hara Chandra Class-XII School, Kamalpur, Dhalai District.
PWD (R&B)
2014-15
SCA 1.000 1.000 2014-15
1.000 1.000 0.000 0.000 1.000
348
Secondary Edn
Construction of Sri Ram Krishna Pathshala J.B. School Viveknagar, (Govt.aidded)
Secondary Edn
2014-15
SCA 0.300 0.300 2014-15
0.300 0.300 0.000 0.000 0.300
349
Secondary Edn
Construction of Shakhicharan Vidyaniketan, N.S. Road.
THCB 2014-15
SCA 5.000 1.000 2014-15
1.000 1.000 0.300 0.300 0.700
350
Secondary Edn
Construction of Champaknagar H.S. School, Champaknagar,
THCB 2014-15
SCA 6.000 1.000 2014-15
1.000 1.000 0.000 0.000 1.000
351
Secondary Edn
Construction of Nidaya High School, Kathalia
THCB 2014-15
SCA 4.650 1.000 2014-15
1.000 1.000 0.000 0.000 1.000
352
Secondary Edn
Construction of Baikhora High school
RED 2013-14
SPA 6.090 0.330 0.037 2013-14
0.330 0.330 0.330 0.330 0.000
353
Secondary Edn
Construction of Baikhora High school
RED 2014-15
SCA 1.000 2014-15
0.330 0.330 0.330 0.330 0.000
354
Secondary Edn
Construction of 4 (four) rooms for Telkajla High School,
PWD (R&B)
2014-15
SCA 0.500 0.500 2014-15
0.500 0.500 0.000 0.000 0.500
355
Secondary Edn
Construction of Melagarh H. S. School.
PWD (R&B)
2012-13
SCA 9.160 1.000 2012-13
1.000 1.000 1.000 1.000 0.000
356
Secondary Edn
Construction of Melagarh H. S. School.
PWD (R&B)
2012-13
SPA 2.700 0.300 2012-13
2.900 2.900 2.700 2.700 0.200
357
Secondary Edn
Up-gradation of Infrastructure of Melaghar H.S School, Melaghar, Sonamura, Sepahijala Tripura.
PWD(R&B)
2015-16
One Tome Special Assistance
2.580 2015-16
2.580 2.580 2.580 2.580 0.000
358
Secondary Edn
Upgradation of Infrastructure of Bishramganj H.S School under Sepahijala District.
THCB 2012-13
SCA 6.390 1.000 2012-13
1.000 1.000 0.000 1.000 1.000 0.000
359
Secondary Edn
Upgradation of Infrastructure of Bishramganj H.S School under Sepahijala District.
THCB 2013-14
SPA 1.800 0.200 2013-14
1.800 1.800 1.800 1.800 0.000
360
Secondary Edn
Upgradation of Infrastructure of Bishramganj H.S School under Sepahijala District.
THCB 2015-16
One Tome Special Assistance
4.390 2015-16
2.195 2.195 1.210 1.210 0.985
361
Secondary Edn
Up gradation of infrastructure of Raishyabari H.S School under Dhalai District.
PWD( R&B)
2013-14
SPA 5.000 0.900 0.100 2013-14
0.450 0.000 0.450 0.450 0.000 0.450 0.000
362
Secondary Edn
Up gradation of infrastructure of Raishyabari H.S School under Dhalai District.
PWD( R&B)
2015-16
One Tome Special Assistance
4.000 2015-16
1.000 1.000 0.000 0.000 1.000
363
Secondary Edn
Up gradation of infrastructure of Chawmanu H.S School under Dhalai District.
PWD( R&B)
2013-14
SPA 6.000 0.900 0.100 2013-14
0.450 0.450 0.000 0.450
364
Secondary Edn
Up gradation of infrastructure of Chawmanu H.S School under Dhalai District.
PWD( R&B)
2015-16
One Tome Special Assistance
5.000 2015-16
1.500 1.500 0.000 0.000 1.500
365
Secondary Edn
Up gradation of infrastructure of Bagan H.S School, Kadamtala under North District.
PWD( R&B)
2013-14
SPA 5.000 0.900 0.100 2013-14
0.900 0.900 0.900 0.900 0.000
366
Secondary Edn
Up gradation of infrastructure of Bagan H.S School, Kadamtala under North District.
PWD( R&B)
2015-16
One Tome Special Assistance
4.000 2015-16
1.000 1.000 0.000 0.000 1.000
367
Secondary Edn
Maintenance of Tripura Board of Secondary Education /SH: maintenance of building portion including water supply & sanitary installations in the premises of Pandit Nehru Complex, Agartala
THCB 2015-16
SDS 0.299 0.299 2015-16
0.299 0.299 0.000 0.000 0.299
368
Secondary Edn
Up gradation of infrastructure of Barpathari H. S. School, South Tripura
PWD (R&B)
2015-16
SDS 6.000 6.000 2015-16
3.000 3.000 0.650 0.650 2.350
369
Secondary Edn
Up gradation of infrastructure of Bishalgarh H. S. School, Sepahijala District
THCB 2010-11
SPA 9.200 4.680 0.520 2010-11
4.680 0.520 5.200 4.680 0.520 5.200 0.000
370
Secondary Edn
Up gradation of infrastructure of Bishalgarh H. S. School- Phase-II, Sepahijala District
THCB 2015-16
SDS 4.000 2015-16
4.000 4.000 0.000 4.000
371
Secondary Edn
Up gradation of infrastructure of Bishalgarh Town Girls' High School, Sepahijala District.
THCB 2015-16
SDS 4.000 4.000 2015-16
4.000 4.000 0.000 4.000
372
Secondary Edn
Up gradation of infrastructure of Kalyanpur H. S. School, Khowai District
PWD (R&B)
2015-16
SDS 5.000 5.000 2015-16
5.000 5.000 1.000 1.000 4.000
373
Secondary Edn
Up gradation of infrastructure of Kumari Madhuti Rupasree High
THCB 2015-16
SDS 4.500 4.500 2015-16
4.500 4.500 0.000 4.500
School, Khowai District
374
Secondary Edn
Up gradation of infrastructure of Teliamura H.S School, Teliamura, khowai District
PWD(R&B)
2015-16
SDS 6.000 6.000 2015-16
3.000 3.000 0.000 3.000
375
Secondary Edn
Up gradation of infrastructure of Ganganagar High School, Ambassa, Dhalai District
PWD(R&B)
2015-16
SDS 3.500 3.500 2015-16
3.500 3.500 0.000 3.500
376
Secondary Edn
Upgradation of Infrastructure of Khumpui Academy (TTAADC), West Tripura, phase-I
TTAADC 2012-13
SPA 8.000 4.500 0.500 2012-13
4.500 0.500 5.000 4.500 0.500 5.000 0.000
377
Secondary Edn
Upgradation of Infrastructure of Khumpui Academy (TTAADC), West Tripura, phase-II
TTAADC 2015-16
SDS 3.000 2015-16
3.000 3.000 0.000 3.000
378
Secondary Edn
Upgradation of Srirampur Surjya Mani Higher Secondary School Kailashahar, Unakoti
PWD (R&B)
2015-16
SDS 3.000 3.000 2015-16
3.000 3.000 0.210 0.210 2.790
379
Secondary Edn
Construction of School Building of Khudiram Basu English Medium School under Central Jail Complex, West Tripura /- S.H. Construction of Boundary Wall with gate, cover slab over the side drain, Development of play ground & Pond
THCB 2015-16
SDS 1.356 1.356 2015-16
1.356 1.356 1.000 1.000 0.356
380
Secondary Edn
Construction of Khowai English Medium School, Khowai
THCB 2015-16
SDS 3.000 3.000 2015-16
3.000 3.000 1.000 1.000 2.000
381
Secondary Edn
Construction of new School Building at Matai Higher Secondary School
PWD(R&B)
2015-16
SDS 1.500 1.500 2015-16
1.500 1.500 0.350 0.350 1.150
382
Secondary Edn
Construction of 100 Higher Secondary Schools & 150 High Schools (additional fund for completion of pending works).
RED 2015-16
SDS 4.878 4.878 2015-16
4.878 4.878 0.530 0.530 4.348
383
Secondary Edn
Construction of Tulashikhar Higher Secondary School, khowai District
PWD (R&B)
2015-16
SDS 3.000 3.000 2015-16
3.000 3.000 0.000 3.000
384
Secondary Edn
Construction of Bharat Sardar Higher Secondary School, Champahour, Khowai District
PWD (R&B)
2015-16
SDS 3.000 3.000 2015-16
3.000 3.000 0.000 3.000
385
Secondary Edn
Construction of Nabin Roy Bari High School, Paharpur, Amarpur, Gomati District
PWD (R&B)
2015-16
SDS 0.875 0.875 2015-16
0.875 0.875 0.000 0.875
386
Secondary Edn
Construction of additional class rooms for Santinagar H.S. School, Dhanpur under Sonamura Sub-Division
PWD (R&B)
2015-16
SDS 2.000 2.000 2015-16
0.000 0.000 0.000
387
Secondary Edn
Infrastructure Development of Ramkrishna Vivekananda Vidyamandir, Dhaleswar, Agartala
THCB 2015-16
SDS 7.950 1.000 2015-16
0.000 0.000 0.000
388
Secondary Edn
Construction of Ajgar Rahamanpur High School, Belonia Sub-Division, South Tripura District
PWD (R&B)
2016-17
SDS 5.000 1.000 2016-17
1.000 1.000 0.000 1.000
389
Secondary Edn
“Construction of 300 seated auditorium at Swami Dayalanand Vidyamandir at Ashram Chowmohani, Agartala”
PWD (R&B)
2016-17
SDS 0.651 0.651 2016-17
0.651 0.651 0.000 0.651
390
Secondary Edn
Up gradation of Infrastructure of Dakshin Amarpur Town Higher Secondary School, Amarpur, Gomati District.
PWD (R&B)
2016-17
SDS 4.400 1.000 2016-17
1.000 1.000 0.000 1.000
Total: Secondary Education
386.653 173.194 110.757
0.000 119.794
91.450 211.244
89.559 18.788 108.347
102.897
391
SW & SE Construction of Anganwadi Training Centre at Narsingarh, Agartala.
RED 2012-13
SPA 5.140 4.626 0.514 2012-13
4.626 4.626 3.313 3.313 1.313
392
SW & SE Additional requirement of fund for completion of remaining AWC.
RED 2012-13
SCA 5.480 5.480 2012-13
5.480 5.480 2.670 2.670 2.810
393
SW & SE Construction of building for Mahila Ashram at Abhoynagar, Agartala, West Tripura
RED 2014-15
SCA 1.500 1.500 2014-15
1.500 1.500 0.335 0.335 1.165
394
SW & SE Construction of 4 CDPO Office Building of Melaghar, Kamalpur NP, Bishalgarh and Boxanagar ICDS
RED 2014-15
SCA 1.000 1.000 2014-15
1.000 1.000 0.000 0.000 1.000
395
SW & SE Construction of new building office of Tripura Commission for Women at Melarmath (phase-I), Agartala, Tripura West.
THCB 2012-13
SPA 9.780 1.800 0.200 2012-13
1.800 0.200 2.000 1.800 0.200 2.000 0.000
396
SW & SE Construction of building for Tripura Commission for Women (Phase-II)
THCB 2014-15
SPA 7.002 0.778 2014-15
7.002 0.778 7.780 2.000 2.000 5.780
Total: SW & SE 22.900 13.428 9.472 0.000 13.428 8.958 22.386 7.113 3.205 10.318
12.068
397
Transport Inter State Truck Terminus, Madhavbari, Jirania, West Tripura
PWD(R&B)
2012-13
SPA 10.130 4.50 0.50 2012-13
4.50 0.50 5.000 4.50 0.50 5.000 0.000
398
Transport Inter State Truck Terminus, Madhavbari, Jirania, West Tripura
PWD(R&B)
2013-14
SPA 4.617 0.513 2013-14
4.617 0.513 5.130 2.830 2.830 2.300
399
Transport Construction of Dhanpur Motor Stand under Kathalia RD Block, Sepahijala District.
RED 2013-14
SPA 2.680 1.666 0.185 2013-14
1.666 1.666 0.539 0.539 1.127
400
Transport Construction of Dhanpur Motor Stand under Kathalia RD Block, Sepahijala District.
RED 2014-15
SCA 0.830 2014-15
0.000 0.000 0.000 0.000
401
Transport Development of Motor Stand, Kalachara, Sabroom, South Tripura
RED 2013-14
SPA 0.800 0.720 0.080 2013-14
0.720 0.720 0.396 0.396 0.324
402
Transport Development of Santirbazar Motor Stand
PWD(R&B)
2014-15
SCA 1.500 1.500 2014-15
0.000 0.000 0.000 0.000 0.000
403
Transport Development of Teliamura Motor Stand
PWD(R&B)
2014-15
SCA 1.500 1.500 2014-15
0.000 0.000 0.000 0.000 0.000
404
Transport Development of Ompi Motor Stand
2014-15
SCA 1.000 1.000 2014-15
0.000 0.000 0.000 0.000 0.000
405
Transport Integrated parking Complex at Khowai Puran Bazar
UDD 2015-16
SDS 2.670 2.670 2015-16
2.670 2.670 0.000 2.670
Total : Transport 20.280 12.333 7.948 0.000 11.503 3.683 15.186 8.265 0.500 8.765 6.421
406
Urban Dev Development/Improvement of Solid Waste Management in 15 Nagar Panchayat.
PWD(R&B)
2013-14
SPA 13.710 6.042 0.670 2013-14
6.042 0.670 6.712 6.042 0.670 6.712 0.000
407
Urban Dev Development/Improvement of Solid Waste Management in 15 Nagar Panchayat.
AMC/MC/NP
2015-16
One Tome Special Assistance
7.000 3.500 3.500 0.000 0.000 3.500
408
Urban Dev Construction of Transhipment Yard on the side of By-pass Road near Khayerpur for Whole Sale Fish Markets, West Tripura.
AMC 2013-14
SPA 3.259 2.933 0.326 2013-14
2.933 2.933 0.000 0.000 2.933
409
Urban Dev Construction of Nagar Panchayat office at Panisagar, North Tripura
RED 2013-14
SPA 3.510 0.450 0.050 2013-14
0.450 0.050 0.500 0.186 0.186 0.314
410
Urban Dev Construction of Nagar Panchayat Office at Panisagar
RED 2015-16
SDS 0.750 2015-16
0.750 0.750 0.000 0.750
411
Urban Dev Construction of Nagar Panchayat office at Ambassa, Dhalai
PWD (R&B)
2013-14
SPA 3.170 0.450 0.050 2013-14
0.450 0.050 0.500 0.000 0.500
412
Urban Dev Construction of Municipal Office at Ambassa
PWD(R&B)
2015-16
SDS 0.750 2015-16
0.750 0.750 0.000 0.000 0.750
413
Urban Dev Construction of Nagar Panchayat office at Santirbazar, South Tripura
PWD (R&B)
2013-14
SPA 3.170 0.450 0.050 2013-14
0.450 0.050 0.500 0.000 0.500
414
Urban Dev Construction of Nagar Panchayat office at Santirbazar
PWD(R&B)
2015-16
SDS 0.750 2015-16
0.750 0.750 0.000 0.750
415
Urban Dev Construction of 100 seated capacity town hall at Kumarghat Town Hall, Unakoti District
PWD (R&B)
2014-15
SPA 11.800 10.620 1.180 2014-15
4.000 4.000 0.000 4.000
416
Urban Dev Construction of Fish Market at Santirbazar Nagar Panchayat under Santirbazar Nagar Panchayat.
PWD(R&B)
2014-15
SCA 1.000 1.000 2014-15
1.000 1.000 0.010 0.010 0.990
417
Urban Dev Beautification of the area around the new War Memorial at Litchu Bagan Agartala
PWD(R&B)
2015-16
SDS 0.520 0.520 2015-16
0.520 0.520 0.520 0.520 0.000
418
Urban Dev Procurement of equipment for Solid Waste Management (SWM) in different Nagar Panchayat/ Municipal Council
AMC/MC/NP
2015-16
SDS 13.230 13.230 2015-16
13.230 13.230 6.615 6.615 6.615
419
Urban Dev Construction of Municipal Office at Kailashahar
MC,KLS 2015-16
SDS 0.865 0.865 2015-16
0.865 0.865 0.000 0.865
420
Urban Dev Development of Mukta Pukur at Officer's Quarter lane, Krishna Nagar, Agartala
AMC 2015-16
SDS 1.460 1.172 2015-16
1.172 1.172 0.000 1.172
421
Urban Dev Development of Kumari Madhuti Rupasri Pond Officer's Quarter Lane, Krishna Nagar, Agartala
AMC 2015-16
SDS 1.130 0.900 2015-16
0.900 0.900 0.315 0.315 0.586
422
Urban Dev Development of Nazir Pukur at Krishnanagar, Agartala /SH: Retaining Wall, Foot Path, Railing & Other allied works etc.
PWD (R&B)
2015-16
SDS 0.834 0.834 2015-16
0.834 0.834 0.000 0.834
423
Urban Dev Construction of 1500 houses in different Urban Local Bodies (ULBs) under Tripura State Government Housing Scheme (TSGHS).
AMC/MC/NP
2015-16
SDS 11.250 11.250 2015-16
11.250 11.250 8.840 8.840 2.410
424
Urban Dev Construction of Market at Aralia, Agartala
PWD(R&B)
2012-13
SPA 9.930 3.200 0.350 2012-13
3.200 0.350 3.550 3.200 0.350 3.550 0.000
425
Urban Dev Construction of Market at Aralia, Agartala
PWD(R&B)
2013-14
SCA 0.355 2013-14
0.355 0.355 0.355 0.355 0.000
426
Urban Dev Construction of Market at Aralia, Agartala
AMC 2015-16
SDS 2.000 2015-16
2.000 2.000 1.600 1.600 0.400
427
Urban Dev Construction of 3(three) storied Festival Hall (Marriage etc.) at Northern side of Town Hall Campus, Agartala
PWD(R&B)
2015-16
SDS 7.500 0.500 2015-16
0.500 0.500 0.000 0.500
428
Urban Dev Development of Banamalipur Dighi (water body) under Ward No.21”
EUD 2016-17
SDS 1.970 1.970 2016-17
1.000 1.000 0.000 1.000
429
Urban Dev Construction of Double storied Shopping Complex near Radhanagar Bus stand, Radhanagar, Agartala (with foundation for three storied).
EUD 2016-17
SDS 3.160 3.160 2016-17
1.580 1.580 0.000 1.580
430
Urban Dev Construction of Battala Fish Market under ward no-35 of Agartala Municipal Corporation
AMC 2013-14
SPA 1.020 0.918 0.102 2013-14
0.918 0.102 1.020 0.918 0.102 1.020 0.000
431
Urban Dev Construction of Battala Fish Market (1st floor) over newly constructed ground floor building under ward no-35 of Agartala Municipal Corporation
AMC 2016-17
SDS 2.120 1.000 2016-17
1.000 1.000 0.000 1.000
432
Urban Dev Construction of Office Building of Mohanpur Municipal Building
RED 201314
SCA 1.970 0.500 2013-14
0.500 0.500 0.500 0.500 0.000
433
Urban Dev Construction of Office Building of Mohanpur Municipal Building
RED 2016-17
SDS 0.720 2016-17
0.720 0.720 0.000 0.720
434
Urban Dev Development and Beautification of Kumari Tilla Lake, Kunjaban, Agartala
AMC 2016-17
SDS 5.000 1.400 2016-17
1.400 1.400 0.000 1.400
Total: Urban Development
101.578 32.063 46.404 0.000 21.943 42.348 64.291 10.346 19.877 30.223
34.068
435
Welfare of Minorities
Installation of mini deep tube well (small bore tube well) fitted with IRP and construction of a 5000 litre capacity water tank cum filter within the premises of Rangamati Darul Ulum Madrassa (residential) at Rangamati GP of Sonamura Sub-Division.
PWD (DWS)
2011-12
SCA 0.109 0.109 2011-12
0.109 0.109 0.000 0.000 0.109
436
Welfare of Minorities
Construction of State Haj House /Musafir Khana at Agartala (1st phase)
PWD (R&B)
2012-13
SPA 3.000 2.700 0.300 2012-13
2.700 2.700 2.560 2.560 0.140
437
Welfare of Minorities
Re-construction of Nazrul Chatrabash (Phase-I),Melarth, Agartala, West Tripura
PWD (R&B)
2013-14
SCA 0.670 0.670 2013-14
0.670 0.670 0.000 0.000 0.670
438
Welfare of Minorities
Development & protection of Wakf properties
PWD (R&B)
2013-14
SCA 0.250 0.250 2013-14
0.250 0.250 0.125 0.125 0.125
439
Welfare of Minorities
Procurement of furniture's, utensils etc. for new building of Nazrul Chhatrabas Melarmath, Agartala,
PWD (R&B)
2013-14
SCA 0.260 0.260 2013-14
0.260 0.260 0.000 0.000 0.260
440
Welfare of Minorities
Construction of boundary wall around Graveyard at Chandinamura, Agartala, West Tripura
RED 2014-15
SCA 0.172 0.172 2014-15
0.172 0.172 0.000 0.000 0.172
441
Welfare of Minorities
Construction of Putia Bazaar Islamia Junior Madrassa at Putia GP under Boxanagar RD Block
RED 2014-15
SCA 0.267 0.267 2014-15
0.267 0.267 0.000 0.000 0.267
442
Welfare of Minorities
Construction of Alaboxi Islamia Sr. (GIA) Madrassa, Melagarh, Sonamura
RED 2014-15
SCA 0.267 0.267 2014-15
0.267 0.267 0.000 0.000 0.267
443
Welfare of Minorities
Construction of Matinnagar Islamia Jr. Madrassa (GIA), Madrassa, Matinnagar, Bishalgarh
RED 2014-15
SCA 0.267 0.267 2014-15
0.267 0.267 0.000 0.000 0.267
444
Welfare of Minorities
Construction of Noagaon Jr. Madrassa (GIA) Madrassa, Gournagar, Kailashahar
RED 2014-15
SCA 0.267 0.267 2014-15
0.267 0.267 0.000 0.000 0.267
445
Welfare of Minorities
Construction of Laximipur Jr. (GIA) Madrassa, Kailashahar
RED 2014-15
SCA 0.267 0.267 2014-15
0.267 0.267 0.000 0.000 0.267
446
Welfare of Minorities
Construction of Chanban Darul Ulam Jr. (SPQEM) Madrassa, Udaipur
RED 2014-15
SCA 0.267 0.267 2014-15
0.267 0.267 0.000 0.000 0.267
447
Welfare of Minorities
Construction of Uttar Durganagar Islamia Jr. (SPQEM) Madrassa, Khowai
RED 2014-15
SCA 0.267 0.267 2014-15
0.267 0.267 0.000 0.000 0.267
Total: Welfare of Minorities
6.330 2.700 3.630 0.000 2.700 3.330 6.030 2.560 0.125 2.685 3.345
448
Welfare of SCs
Development of 3 (three) Harijan Colonies, namely (i. Barjala Rs.55 lakh (ii) Indranagar Rs.18 lakh (iii) Bhagat Singh Rs.22 lakh)
PWD (R&B)
2012-13
SCA 0.950 0.950 2012-13
0.950 0.950 0.490 0.490 0.460
449
Welfare of SCs
Repairing of Quarter of Harijan (Barjalla/ Indranagar / Bhaghat Singh Colony), Agartala
PWD (R&B)
2013-14
SCA 0.100 0.100 2013-14
0.100 0.100 0.000 0.000 0.100
450
Welfare of SCs
Construction of Houses for Harijan Colony attached to I.G.M Hospital, Agartala ( phase-II)
PWD(R&B)
2015-16
SDS 4.270 0.750 2015-16
0.750 0.750 0.000 0.750
451
Welfare of SCs
Construction of quarters for Safai Karmachari at Harijan Colony, IGM Hospital Complex, Agartala,
PWD(R&B)
2015-16
SDS 2.930 2.930 2015-16
2.930 2.930 0.000 2.930
Total: Welfare of Scheduled Castes
8.250 0.000 4.730 0.000 0.000 4.730 4.730 0.000 0.490 0.490 4.240
452
Welfare of STs
Re-construction of Kumari Madhuti Rupasree (KMR) Tribal Rest House, Agartala, Tripura West
THCB 2014-15
SPA 6.830 6.149 0.683 2014-15
6.149 0.683 6.832 0.500 0.500 6.332
453
Welfare of STs
Construction of Quarters (12 nos.) for residential School at Bhuratali, Sabroom
THCB 2014-15
SCA 2.733 2.733 2014-15
1.367 1.367 0.500 0.500 0.867
454
Welfare of STs
Construction of Quarters (12 Nos.) for Ashram School at Ambassa, Dhalai
THCB 2014-15
SCA 2.738 2.738 2014-15
1.369 1.369 0.500 0.500 0.869
455
Welfare of STs
Construction of 30- Residential Quarters (Type-III) for Hostel Superintendent attached to Governmenment run ST Boys/Girls Hostel in Tripura (@ Rs. 33.20 lakh for each hostel)
RED 2015-16
SDS 9.960 9.960 2015-16
9.960 9.960 1.360 1.360 8.600
456
Welfare of STs
Construction of Community Hall at Khejurbagan, Agartala, West Tripura.
RED 2015-16
SDS 1.986 1.200 2015-16
1.200 1.200 0.000 1.200
457
Welfare of STs
Construction of Hostel attached to Garia Academy Model School at Attarabhola
RED 2015-16
SDS 5.680 2.200 2015-16
2.200 2.200 0.520 0.520 1.680
458
Welfare of STs
Procurement of 5(five) new vehicles for use of the Hon'ble Executive Members, TTAADC, Khumulwng
TTAADC 2015-16
SDS 0.435 0.435 2015-16
0.435 0.435 0.435 0.435 0.000
459
Welfare of STs
Construction of quarters for Hon'ble Chief Executive Member & Hon'ble Executive Members, TTAADC, Headquarter Complex, Khumulwng
TTAADC 2015-16
SDS 6.622 6.622 2015-16
6.622 6.622 3.312 3.312 3.311
460
Welfare of STs
Construction of Patisri Play Centre ( N.K.Para) and Coaching Complex under Bokafa RD Block, South Tripura.
TTAADC 2015-16
SDS 0.832 0.832 2015-16
0.416 0.416 0.000 0.416
461
Welfare of STs
Construction of Cultural Academy at South Taibandal, Sonamura, Sepahijala.
TTAADC 2015-16
SDS 0.890 0.890 2015-16
0.445 0.445 0.000 0.445
462
Welfare of STs
Construction of Cultural Academy at Murasing Para, South Tripura.
TTAADC 2015-16
SDS 0.890 0.890 2015-16
0.445 0.445 0.000 0.445
Total: Welfare of Scheduled Tribes
39.596 6.149 29.183 0.000 6.149 25.141 31.290 0.500 6.626 7.126 24.164
463
YA & Sports
Development of playground opposite to Bholagiri Ashram keeping the provision of galleries on the Southern side.
PWD (R&B)
2011-12
SCA 2.310 0.250 2011-12
0.250 0.250 0.170 0.170 0.080
464
YA & Sports
Construction of Play Ground Opposite to Bholagiri Ashram at Agartala
PWD (R&B)
2014-15
SCA 2.060 2014-15
0.500 0.500 0.500 0.500 0.000
465
YA & Sports
Construction of Lawn Tennis court and related infrastructure for Lawn Tennis at Dasharath Deb State Sports Complex, Agartala.
PWD (R&B)
2014-15
SCA 2.000 2.000 2014-15
1.050 1.050 0.000 0.000 1.050
466
YA & Sports
Construction of 3-storied building for Sports Office at the Eastern side (behind grand stand ) of Swami Vivekanada Maidan, Agartala
THCB 2015-16
SDS 5.799 5.799 2015-16
5.799 5.799 0.000 5.799
467
YA & Sports
Construction of District Sports Complex at Udaipur, Gomati District Tripura/ SH: construction of boundary wall, athletic track, surface drain grand stand and development of site by earth filling etc.
THCB 2015-16
SDS 2.550 2.550 2015-16
2.550 2.550 0.000 2.550
Total: YA & Sports 12.659 0.000 12.659 0.000 0.000 10.149 10.149 0.000 0.670 0.670 9.479
Grand Total: 2483.9620
1045.0717
685.1274
725.2784
541.2917
1266.570
546.9647
265.0578
812.023
454.548