DEMOCRACY NETWORK PROGRAM Tirana, Albania Quarterly Progress Report July - September 1999 C.A. No. DHR-0032-A-OO-5024-00 American ORT 1900 L Street, NW, Suite 603 Washington, D.C. 20036 USA Tel: (202) 293-2560 Fax: (202) 293-2577 E-mail: [email protected]

Transcript of DEMOCRACY NETWORK PROGRAM

DEMOCRACY NETWORK PROGRAM

Tirana, Albania

Quarterly Progress Report July - September 1999

C.A. No. DHR-0032-A-OO-5024-00

American ORT 1900 L Street, NW, Suite 603

Washington, D.C. 20036 USA Tel: (202) 293-2560 Fax: (202) 293-2577

E-mail: [email protected]

jmenustik
Rectangle

ORT Albania Democracy Network Program Quarterly Progress Report

July - September 1999

I. GRANTS PROGRAM

ORT has awarded 81 grants to Albanian NGOs since June 1995 totaling approximately $900,000. The Demnet strategy focuses on strengthening NGO institutional capacity as well as the ability to engage in public policy-oriented activities in the four priority sectors. The following is a summary of the current grantees:

Democracy Sector Grants

DEM-026 Albanian Center for Economic Research: "Improving Municipality Services: Developing and Implementing a Local Level Anti­Corruption Action Plan" (MG-$S,OOO) Start Date: 01101199 End Date: 06130199

ORT gave a grant to ACER earlier this year to address the pervasive problem of corruption at the local government level. On September 20, 1999, ACER conducted a public debate called the "Ethic Code of Public Officials" in Tirana. The debate was attended by 30 people consisting of representatives from the Parliament, the Chief of the Human Resource Department in the Council of Ministers, as well as Directors from Human Resource Departments in government institutions, local government experts, NGOs and journalists. The event was also attended by Mr. Joe Pastic, USAID Program Officer and Mr. Antonio Iskandar, Deputy Chief of Party for the USAlDlPublic Administration Program in Albania (PAPA).

The debate focused on the necessity to design a code of ethics for civil servants as a component of public administration reform; the content of the draft code prepared by ACER in order to find ways to review, improve and to introduce andlor approve it by governmental and judicial agencies. The debate was organized into two sessions: "A Code of Ethics for Civil Servants" and "A Code of Ethics for Principles of Civil Servants".

The first session was focused on public administration reform; shortages and the necessity for improving the legal framework in this area; non-ethical behavior of civil servants and reasons of the corruption phenomenon of public officials; remitting procedures of central government officials behavior, etc. The second session was focused on more concrete elements regarding the

. draft code of ethics for civil servants prepared by ACER, and the need of its harmonization in relation to other laws.

Various speakers presented current situations in each government institution. All participants stressed the necessity of approval for a code of ethics for public officials. ACER will continue to participate with other interested institutions to improve the Draft Ethic Code and to find ways for its approval by the respective governmental structures as a guideline to every public official.

1

DEM- 028 Institute for Contemporary Studies: "Efficient, Non-discriminatory and Transparent Public Procurement Law" ($4,960) Start Date: 06110199 End Date: 11130199

The Institute for Contemporary Studies (ISB) was awarded a grant in June 1999. The first action was the formation of a working team composed of 1SB experts. Team leader-Artan Hoxha, Public Administration Expert - Fatbardh Kadilli, Public Financial Expert - Dritan Shano, as well as three short-term experts.

The main goal in the first few months was to identify the formal and informal rules in the decision making process in the procurement of goods and services with public funds. The working team analyzed the existing legal framework, rules and procedures issued by the authorities such as the National Procurement Agency, Ministries and local govenunents. The team has identified some key problems which seem to be related to the inefficiencies in the system as well the opportunistic behavior by members of public organizations.

The identification of such problems led to the decision to prepare a questionnaire for further investigation. The questionnaires were used to conduct interviews with public officials, businessmen and experts in the field. The questionnaires have produced some main outcomes such as the opinion of different officials regarding the main problems of the procurement system as well as their ideas for solutions. 1SB will conduct 30 face-to-face interviews using the questionnaire.

In the coming months the teams work will focus on the following: completion of the interviews; preparation of the draft research report; setting up an extended team; discussions on the report and feedback; and round table discussions of the outcome of the project.

Economic Growth Grants

ECON-009 Albanian Consumers Association: "Cooperation of ACA with the Local and Central Government on Implementation of Consumer Protection Law and Other Laws Strengthening Consumers Rights" (DAG-S30,000) Start Date: 01101199 End Date: 12131199

The mid-term evaluation of this grant was conducted in July 1999. Performance indicators were identified and agreed to by both parties as key measures of the success of the project. In regards to the Consumer Law, ACA operates in 12 prefectures, 6 more then originally planned. In Tirana, ACA has carried out training to encourage cooperation with local govenunent as well as to build the capacity of consumers to deal with the market economy. The Tirana region covers four municipalities and 24 conununes. The association has 184 groups of consumers with 18,200 members.

2

Specifically, ACA's training topics have been:

Basic Consumers Rights (3 sessions) International Consumers Rights (2 sessions) Consumers' Law (1 session) Environmental Protection Law (3 sessions) Patients Rights Card (1 session) Drug Law (1 session)

Outside of Tirana, ACA has conducted training in: Elbason, Fier and Vlora.

During the first six months of the project, ACA proposed 10 additional articles regarding food and drug laws as well as other laws. These articles have been taken into consideration and approved by the government.

The association has undertaken a variety of programs such as:

Promoting the Consumer law on the national level, Recruitment campaign for new members, How to write a complaint letter, How to select a product, Request to the government to translate products' labels (90% of all food products in Albania are imported), How to welcome Kosovar refugees, and Information for refugees regarding accornmodations, living conditions, personal hygiene and stress.

ACA has made over 100 recommendations for the improvement and change oflaws such as the food law, drug law and veterinary law. Many expired food products and drugs have been blocked from the market by the intervention of ACA.

Thirteen people have been trained in four different municipalities. Coordinators of the centers cannot offer counseling services until they have received 250 training hours. The Executive Director and the Finance Officer of ACA visit each center on a monthly basis to ensure implementation of the projects activities.

The Research Council, as part of the Consumers Institute, has reviewed 12 different reports submitted by ACA, for example, the toothpaste and cosmetics report. ACA has raised the issue of dioxin. The report was presented to the Ministry of Health with a proposal to establish special testing facilities.

Additionally, ACA worked with the Ministry of Health and the Ministry of Agriculture in regards to pesticides and the health hazards. Through the support of both Ministries, pesticides were destroyed. During the first half of the ORT grant, policy campaigns were organized by ACA in: "Consumers Law" presented on a national basis in 12 regions with over 300 participants, and "Consumers Rights".

3

Through ACA, the Ministry of Education has created a new curriculum in the middle schools. The efforts began with the hiring of an Education Coordinator in February 1999. The Coordinator works with grades two-eight in 32 schools in the Tirana district. The Coordinator has trained seven groups of teachers and provided materials on different subjects to design one­hour weekly lessons.

Topics have included:

Children' rights Environment Nutrition Drugs AIDS Tobacco Consumer Rights Health Education

The Ministry of Education supports the curriculum, and will extend the program to all middle schools throughout Albania as well as into Kosovo.

ECON-Oll National Union of Albanian Farmers: "Promoting Policies in Support of Agricultural Development" ($25,289) Start Date: 02126199 End Date: 02126100

During this quarter, the National Union of Albanian Farmers (NUAF) conducted training meetings with members of NUAF in every county, commune, district and region as well as meetings with the Board of Directors ofNUAF and local and national government agencies.

NUAF has organized activities throughout Albania in 258 counties, 158 districts and 30 regions. Every month NUAF organizes meetings with different members from various parts of Albania. The main purpose of the training has been to educate farmers in law issues. Areas that are covered in the education training are as follows:

What are land taxes and what they mean for the farmers. What are the criteria for implementing the laws. What the EST European countries experiences are in regards to this law (Macedonia.

Bulgaria, Poland). What Western countries experiences are in regards to the law. Ways in which to manage and administer incomes Uses of incomes Relations between local and central governments How incomes will influence the farmers' life conditions What will be the benefits for the farmers and their families.

4

As a result, fanners are more aware of the importance of the land taxes, and their direct influence on every day life. NUAF has established good working relations with the Agriculture and Food Ministry, as well as with the judicial office. Discussions focus on alternatives to land taxes as well as trying to influence them as much as possible to convince them of the fanners' rights. NUAF has continuously kept in contact with scientific institutions such as the Land Studying Institute to help define land classification criteria. NUAF will continue to organize training meetings with fanners to exchange necessary information.

The improvement of Land Tax Laws is a long and difficult process. It is necessary for NUAF to continue to push to achieve its objectives. NUAF is strongly committed to accomplish these objectives because it knows the farmers are willing to contribute and play an active role in this area. In September-October 1999, NUAF will work to develop the Draft n and will work in cooperation with the Agriculture Ministry's Judicial Office, Land Studying Institute, Judicial Group, Legislation Work-Group ofNUAF, local governments and the agriculture departments.

In October 1999, NUAF in cooperation with the Agriculture and Food Commission and Finance and Economy Commissions, will conduct a Public Hearing about the improvement of the Land Tax Law.

II. NGO DEVELOPMENT and SUSTAINABILITY STRATEGY Institutional Development Grants Program

SARC-OOI Foundation "Regional Agency for Development" 1 Elbasan: "NGO Development and Sustainability Strategy" (IDG-$15,000) Start Date: 09/01199 End Date: 04/30/00

SARC-002 Albanian Disability Rights Foundation: "NGO Development and Sustainability Strategy" (IDG-$15,000) Start Date: 09/01199 End Date: 04/30/00

SARC-003 Foundation "Regional Agency for Development" 1 Tirana: Development and Sustain ability Strategy" (IDG-$15,000) Start Date: 09/01199 End Date: 04/30/00

"NGO

SARC-004 Dairy Entrepreneurs National Association: "NGO Development and Sustainability Strategy" (IDG-$15,000) Start Date: 09/01199 End Date: 04/30/00

During the month of August, ORT signed the Memorandum of Understanding with the four selected organizations as listed above. This Memorandum will cover the first two months of the Program and in November, ORT will sign the Sub agreement that will cover the duration of the grant period. The grantee budget and work plan will be determined during the first two months to be included in the formal Subagreement.

5

As the ORT partner in NGO Development and Sustainability Strategy, ANTTARC developed and delivered organizational development training and technical assistance to ORT's four IDG recipients. Early in the quarter, on-site organizational training and technical assistance needs assessment protocol,· instrumentation, work plan, and timelines were developed; a list of potential additional board members was compiled, and necessary changes in the NGOs' legal statutes were identified. In addition, plans and preparations were made for the IDGs' Boards of Directors NGO Development, Leadership, and Strategic Planning retreat, including development of training retreat agenda and curricula, training manuals, and logistical arrangements.

A needs assessment instrument was carefully designed to assess present, mid-term, and long­term operational capacity of the NGOs, evaluate their project implementation, monitoring, and reporting capacity, and identify needs that could be addressed through the IDG Program. The instrument reflected lessons learned during the development and use of the assessment instrument during the IDG selection phase. A detailed work plan for the IDG Program was developed including objectives, activities, expected results, tentative timelines, and monitoring. The lawyers provided by ICNL worked with training consultants and organizations' board members and executive directors to review the NGOs' statutes and legal status, identify needed changes, and subsequently complete the changes.

On-Site Needs Assessment

During the first week of September, after the Memorandum of Understanding between the ORT and four NGOs was signed, ANTTARC training consultants conducted on-site needs assessments of the four NGOs employing the protocol and instrument developed in advance. In order to ensure effectiveness and efficacy, one training consultant was assigned to each organization, with the entire ANTTARC staff serving as support. Assessment visits were preceded by a careful review of all materials related to the NGOs including application forms and other documents, interview notes, and the first on-site assessment reports.

The assessment team was comprised of the assigned training consultant, a second training consultant, the program director, and the local ORT organizational development advisor. Assessment teams focused on identification of any changes that had happened in the organizations since the last on-site assessment visit conducted in May 1999, including the present legal and financial status. The instrument proved to be very effective and efficient. Upon completion of the assessments, needs related to training and technical assistance, board restructuring and staffing, legal statutes and registration, operational systems, and needed fmancial support were identified.

Training and technical assistance needs were generally the same among the four organizations, and included strategic planning, public relations strategic plan and materials, cross-sector collaboration and fundraising strategic plans, policies and procedures, by-laws, financial management, personnel management, etc. These organizational development elements were either non-existent or at a nascent stage. ADRF was at a more advanced stage because of its relationship with its founder, OXF AM. The Boards of all four NGOs needed to be restructured, to add new members and ensure diversity. Three organizations--DENA, RDAE, RDAT--needed

6

to recruit new staff in order to carry out the IDG Program and ADRF was in the process of hiring a new executive director.

On Site Technical Assistance

Needs assessment visits were followed by continuous on site-technical assistance that focused on development of operational budgets and baseline reports, board restructuring, staffing, and development of institutional capacity elements.

Board Recruitment

Based on identified limitations of existing boards, a rigorous process of board restructuring was completed. The goal was to create independent and diverse boards of directors. Specific objectives of this process included assessment of current boards, identification of potential board members, and recruitment of new board members. The existing boards were assessed including review of board composition and evaluation of each board member against criteria developed by training consultants in close collaboration with the NGOs. Based on assessment results, plans for recruitment of new board members were developed and candidates for new potential board members were identified. The new board profile included at least ten members representing various sectors and areas of expertise.

New board members were recruited following a rigorous procedure. Their CVs were carefully screened and the best candidates were informally interviewed. Each candidate was evaluated according to established criteria and contribution he/she would bring to the organization. Training consultants, board chairpersons, and executive directors were significantly involved in this process. Recommendations were made to the boards and ultimately approved. Upon completion of the process the boards of directors of the four organizations were restructured with new board members who met the established criteria and represented various sectors and areas of expertise. It was the first time that these organizations recruited new board members according to standardized rigorous procedures.

Board of Directors NGO Development, Leadership, and Strategic Planning Retreat

Twenty-eight board members from four organizations participated in the NGO Development, Leadership, and Strategic Planning Retreat that was held in Ohrid, Macedonia from September 25 through October 3, 1999. The purpose of the training retreat was to increase board members' roles and responsibilities. The retreat objectives included: understanding international NGO standards and NGO roles, principles of policy governance and basic NGO board responsibilities, organizational and board structure, board's role in strategic planning, relationship between the board and executive director; board accountability; organizational assessment; board's role in budgeting and financial management; and development of bylaws and strategic plans for cross­sector collaboration, fundraising, and public relations.

7

Retreat Preparation

Extensive preparations and logistical arrangements were necessary, including visas and travel. Participants were informed in advance about the retreat agenda and logistics. The retreat site was intended to provide a work environment conducive for participants to focus on development of their organizations away from their daily responsibilities and distractions. Board members and training consultants traveled together by bus to Ohrid where they had the opportunity to get to know each other. This helped to enhance their relationships and receptiveness. The agenda and training manual were developed taking into consideration the NGOs' needs and specifics of the activities especially related to group composition and intended results.

The manual combined theory and practice and included sections on the NGO Development and Sustainability Strategy; NGOs and their boards; boards' role in strategic planning, cross-sector collaboration, public relations, fundraising, and revenue generation; relationships between the board and executive director; board accountability; organizational assessment; financial management; board bylaws; and organizational structure. Detailed session plans were developed in advance including session objectives, timing, methodology, and reference and resource lists. In order to measure progress, pre-post evaluation and satisfaction surveys were developed. Experience gained from the participation in or conduct of previous training retreats was very helpful for the successful completion of retreat preparations. ANTTARC's resource library-­which proved to be very resourceful--was used extensively by training consultants to prepare the curricula and manual.

Achievements

The retreat was conducted through a combination of training and practical experience. Board members, with technical assistance provided by ANTI ARC training consultants, were not only trained in organizational development, but also worked to produce numerous operating systems and documents for their organizations including mission and vision statements; goals and objectives; public relations, cross-sector collaboration, and fundraising strategic plans; action plan for financial management system; action plan for recruiting and retaining the executive director; position description and employment contract of the executive director; performance evaluation policy and procedure for the executive director; board bylaws; organizational chart; organizationallboard structure; and board member position description (see Attachments). By developing these documents themselves, their sense of ownership and commitment to implement them upon return to their organization was increased.

Different methods were used to achieve training retreat objectives including warm up and teambuilding exercises, brainstorming, group discussions, lectures, small group work, presentations, etc. Small group work proved to be very effective, primarily because it ensured total participation, enabled participants' understanding of issues in the context of their specific organization, and enabled them to identify directions for their future work. Sessions were facilitated by the training consultant responsible for conducting the specific session assisted by training consultants assigned to their respective NGO who worked with their respective organizations during the entire retreat. This also helped to strengthen the working relationships

8

between training consultants and board members. The training manual was provided to participants in advance, and together with ANTTARC's catalogue, was used extensively by participants in plenary session discussions as well as in working groups.

During the introduction, the NGO Development and Sustainability Strategy was introduced to participants by ORT's organizational development advisors. Special attention was paid to the IDG Program component and the role of the boards of the four organizations in successfully accomplishing this component.

The session on NGOs was intended to enable participants to understand international NGO standards and govern their organization according to them. The specific objectives of this session included: understanding differences between private, governmental, and non­governmental organizations; understanding the NGOs role in community; and identifying goals of the Albanian NGO sector for the future. International NGO standards were first introduced to the total group, with participants breaking out into small groups where each group worked on two or three standards. A representative from each group presented the product of their group to larger group. Presentations were followed by discussions where all participants took part actively. The same method was used to identify strengths and weaknesses of the Albanian NGO sector.

The session on NGO Boards was intended to enable board members to understand the role of boards in non-governmental organizations. Specific objectives included: understanding NGO boards, understanding basic principles of policy governance, understanding basic responsibilities of NGO boards; understanding board member's role in fundraising, understanding board chairperson's role, and enhancing board meeting effectiveness. Discussions on these topics in the plenary session were followed by work in small groups and presentation of their product to other groups. By the end of this session, participants were able to explain board members' responsibilities.

The strategic planning session was intended to enable board members to develop an organizational strategic plan. The specific objectives of this session included understanding the role and process of strategic planning, development of mission and vision statements, and development of short-, mid-and long-tenn goals and objectives. The role and process of strategic planning was extensively elaborated. Emphasis was given to the role of strategic planning as an effective management tool that assists the organization to be successful and strategic planning as a process needed for the organization to set establish priorities essential to accomplishing its mission in response to a rapidly changing environment.

A major objective of the strategic planning session was that participants developed mission and vision statements for their respective organizations. All participants were actively involved in the plenary session discussions on the importance of mission and vision statements. Participants then split into small groups, based on organization, to develop mission and vision statements for their organizations. Their product was presented to other groups. Presentations were followed by discussions where all trainees participated actively. Using the same method and based on the critical issue approach, participants developed short-, mid-, and long-tenn goals and objectives. Careful attention was paid to SWOT analysis, which was not previously familiar to participants.

9

During the session on public relations, participants were introduced to tools and techniques used to promote organizations, increase public awareness, and market services. They were also introduced to different methods and communication instruments used to send messages to different audiences. fu small groups, participants developed strategic plans for public relations for their respective organizations, which were then presented to the other groups. Presentations were followed by discussions where all board members participated actively.

During the fundraising and revenue generation session, participants were introduced to different types of fundraising and revenue generation strategies and techniques. fu small groups, they developed fundraising strategic plans for their respective organizations, which were then presented to other groups. Presentations were followed by discussions where board members of the different organizations shared their experience and ideas.

The session on relationships between board and executive director intended to enable board members to clarify roles and responsibilities of the board and executive director. Specific objectives of this session included: identifying key steps in leadership transition; understanding board's role in finding and retaining the executive director; understanding assessment of the executive director by the board; understanding board members' reluctance to assess the executive director; and identifying assessment types and criteria. Divided into four groups, board members of each organization developed a recruitment plan, position description and employment contract, and performance evaluation policies and procedures for the executive director.

The session on board accountability had the specific objectives of identifying ten ways through which boards maintain accountability, understanding the roles of board and executive director, and identifying five major obstacles to board's carrying out its responsibilities.

The session on organizational assessment enabled board members to understand their role in assessing the performance of the organization. Specific objectives for this session included understanding the importance of organizational assessment, identifying what should be assessed, and understanding time and methods for organizational assessment.

The session on financial management included objectives: understanding the role of board in monitoring, oversight, and auditing of the organization; development of financial rules and objectives; understanding the budgeting process; understanding ORT's financial management and reporting requirements. The session was a combination of lectures, discussions, and small group work. Each organization developed a financial management action plan. ORT's financial officer introduced portions of this session related specifically to ORT's requirements.

Specific objectives of the session on board bylaws included: understanding the role and importance of board bylaws; understanding bylaws structure; and development of board bylaws. Bylaws and their importance in governing the organization were introduced. Board members shared their experiences in drafting different regulations and emphasized articles that should be included in bylaws. fu small working groups, participants developed draft bylaws for each organization to be reviewed by ICNL legal experts.

10

Brainstonning and practical exercises were used to help participants. understand the organizational structure, organizational chart and hierarchy, reporting, and relationships between various departments. Board members developed organizational charts and identified board composition in terms of age, gender, geography, area of expertise, and sector. Participants also identified policies and procedures for recruitment of new board members and developed board member position descriptions. Board members also began working on establishment of board committees and election of board officers that would be finalized during ANTIARC's post­retreat follow up.

Results

Analysis of pre-post evaluation forms indicated that most of the participants had never participated in an intensive retreat. At the beginning of the retreat, participants were somewhat acquainted with the role, goals, objectives, strengths, and weaknesses of Albanian NGO sector, but they had relatively limited knowledge on international NGO standards. Almost all were unfamiliar with the process of development of mission and vision statements, strategic fundraising, and public relations. They were totally unfamiliar with board bylaws.

At the end of the retreat, responses showed the following: the highest level of understanding and increased competence for the topic of board roles and responsibilities, increased understanding of the NGO Development and Sustainability Strategy, and good understanding of the process of setting short-, mid-, and long-term goals and objectives, development of vision and mission statements; and legal issues related to the organizational statute.

Board members found their participation in the training retreat to be very helpful. They responded that all topics were very fruitful and impressive especially fundraising, public relations, international NGO standards, board's roles and responsibilities, and the relationship between board and the executive director. Small group and plenary discussions were especially appreciated. Several respondents underlined that they wanted to spend more time on board bylaws, organizational structure, strategic planning, and financial management.

A five-point Likert scale (I-totally unsatisfactory, 5-totally satisfactory) was used to measure participants' satisfaction level. Participants rated facilities and accommodations 4, retreat organization and administration 4.6, and the retreat in general 4.7. Training consultants' presentation and responsiveness were rated respectively 4.6 and 4.5 and documents produced 4.6. They also wrote comments such as: " ... deeply impressed by the preparedness, politeness, and communication skills of ANTTARC staff'; " ... totally satisfied with the documents produced and the training consultants' assistance"; " ... retreat was very well organized"; " ... better than expected"; " ... very useful for our professional growth."

The retreat was also very much appreciated afterwards. In a letter sent to ANTTARC's executive director and ORT's organizational development advisor, ADRF President of the Board emphasized: " Participation in this retreat was a valuable experience for all ADRF board members and important for their professional development related to NGO issues... The way the retreat was organized, combining theory and practice ... was very fruitful. Particular interest was expressed for all topics included in your manual because it constituted a contemporary approach

11

regarding work with NGOs... Congratulations for excellent retreat results." The RDAT Executive Director among others wrote: A ... thank you for the excellent organization of the retreat... Board members benefited very much from such a great seminar.. Obviously their role regarding the development and sustainability of Tirana Foundation will be much higher than before. The RDAE Executive Director emphasized: "All our board members that participated in the training retreat...express maximum thanks and evaluation... They found the training very useful and they highly appreciated it. The gap in their knowledge ... now is really reduced". (See Attachments)

Post Board Retreat Follow Up

Irmnediately after return from Ohrid, training consultants began providing on-site technical assistance for finalizing and implementing items developed during the retreat which included formatting and editing all documents developed in Ohrid ( see Attachments), developing a staff recruitment plan and budget proposal (see Attachment), and reviewing statute and bylaws.

The recruitment plan consisted of identification of additional employee positions needed, preparation of recruitment criteria, preparation and publication of employee position announcements, collection of applications, selection and recruitment of finalists (see Attachments). Employment positions of one full-time program assistant and part-time financial manager were identified for RDAE and RDAT. Employment positions of full-time program assistant and financial manager was identified for DENA. RDAE and DENA published announcements in one main newspaper for three consecutive days. RDAE published announcements in the local newspaper (see Attachments). Also, RDAT advertised the employment position announcements at the Tirana Chamber of Commerce.

Based on results of needs assessment visits, budget proposals were developed for DENA, RDAE, and RDAT. Budgets for operational expenses were developed jointly by the NGO executive directors of three organizations and ANTTARC training consultants. ICNL lawyers, training consultants, presidents of boards, and executive directors worked together in reviewing statutes of four organizations and necessary changes were identified. At the same time, they started working to reflect these changes in board bylaws.

III. TECHNICAL ASSISTANCE AND TRAINING

Interaction Forum

On September 16-17 1999, ORT Democracy Network Program organized in Tirana, Albania the first "Interaction Forum". The goal of the Forum was to facilitate greater interaction between international and Albanian NGOs. More specifically, the objectives of the Forum were to identify the needs of the Albanian NGOs by sector; and, initiate working relationships between Albanian and international NGOs, by identifying some concrete forms of cooperation.

The idea of the Forum was conceived during the Kosovo refugee crisis in 1999. A large percentage of the nearly 200 international NGOs who arrived in Albania to assist with the influx

12

of Kosovar refugees sought local NGOs as partners in the delivery of their services yet struggled to find qualified organizations. Similarly, efforts to coordinate the efforts of NGOs, both international and local, often resulted in uneven representation by international groups. Albanian NGOs commented on the lack of contact they had with international NGOs and vice versa.

While many of the humanitarian aid organizations have left Albania, a significant number remain who want to make the transition from provision of humanitarian aid to refugees to development work with Albanian communities. And, as before, these groups would appreciate finding local NGOs to partner in the implementation of their programs as well as strengthen their capacity.

After drafting and circulating a "concept paper", ORT organized a small group to provide feedback and to refine the draft. This group, an equal balance of international and Albanian NGO represented, consisted of: Women's Center, Foundation for the Reconciliation of Disputes, Albanian Youth Council, OSCE, Humanitarian Information Centre, UNHCR Community Services. When the original plan for a one-day event grew into two days, OSCE and UNHCR offered to join in a cost-sharing arrangement with ORT to host the event. UNHCR agreed to fund approx. 50 percent of the Fomm's expenses.

ORT had extensive meetings with donors to present the Fomm's idea and personally invite them to the Fomm. The Fomm brought together donors, local and international NGOs, for the first time since the crisis, and it was crucial to hold individual meetings with them.

A group of eight facilitators was hired to facilitate the discussions in the Fomm's small-working groups. ANTTARC had four training consultants as part of the facilitators group. ORT held two briefing sessions about the format and objectives of the Fomm, as well as the facilitation process in the small working-groups and the reporting format. Careful emphasis was given to attract media attention through announcements and press releases.

The Fomm consisted of 154 attendees, representing 85 Albanian NGOs, 29 international NGOs, 20 Donor Organizations and 5 govemment representatives. The Fomm format was a combination of panel discussions and sector working groups. Panel presenters were comprised of govemment representatives (Minister of Labor), donor organizations (USAID Director, UNDO, World Bank and Open Society Foundation) and Albanian and international NGOs. Working Groups were broken into sectors (Democracy, Economic, Environmental and Social). Panel discussions and Sector Working Groups focused on current needs and recommended changes within the NGO sector in Albania.

Overall, participants, including panel members, felt that the following areas need to be addressed to enable the Albanian NGO sector to move forward in the future:

NEEDS:

• Social needs are great especially for youth/children, • The rural areas, where 70% of the population live, need greater attention by NGOs and

donors. Albanian NGOs need to create branches in remote areas, • The Government and NGOs need to come together to support each other,

13

• Many projects were created during the Kosovo crisis. When the refugees left, so did the NGOs. A vacuum was created and is strongly felt,

• Media training is greatly needed to develop long lasting, positive relationships, • Support from foreigners needs to be focused on long-term assistance rather then short term

"quick fixes", • Training, training and more training: Assistance to NGOs from donors needs to be focused on

training (proposal writing, financial management, organizational capacities, strategic planning, high NGO standards, etc.) in order to create self-support and sustainability,

• NGO laws and legislation need to be created, • Creation of volunteer policies, • Assistance in creating income generating activities, • Exchange and dissemination of information regarding NGOs is greatly needed to bring about

awareness within the commuuity, the government and to the NGOs themselves, and • Information Centers need to be established to assist NGOs in searching for donors outside of

Albania as well as create a network in which Albanian NGOs can support each other.

An "Information Comer" was open during both days at the Forum. All participants were invited to display their promotional materials and one-two page summaries of their organization's activity, in English. The "Information Comer" was highly appreciated by the participants as a innovative idea and concrete form to share information and to learn about each-other.

ORT provided a comprehensive list of the participating organizations with detailed contact information. It was the first time such an updated list of local and international NGOs was produced. Many international organizations expressed surprised to see so many Albanian NGOs. Before the Forum some even thought that an NGO sector does not exist in Albania. ORT is planing to develop the list into a formal NGO directory.

Both Albanian and international NGOs leamed many lessons from the recent Kosovo emergency crisis. Many Albanian NGOs were caught off guard and were not prepared to react to the crisis on a timely basis. International NGOs coming into Albauia were not focused on developing organizational capacities of Albanian NGOs but on responding to the crisis at hand. International NGOs were criticized for not wanting to cooperate with Albanian NGOs. International NGOs responded that there was a lack of information available to them regarding Albanian NGOs and their areas of expertise.

The Forum had wide coverage by the state and private media, both electrouic and printed. Several press releases, interviews and articles were published in newspapers and a 30 ruinute radio program about the Forum was aired over the next two days.

Round-table discussions are planned in the future to keep the commuuication flowing between Albanian and international NGOs. ORT DemNet has planned for two follow-up projects in November and December 1999. The response from participants was overwhelming. A great number of attendees remarked that this was a much-needed forum and provided the opportuuityto "clear the air" about past issues (see: Summary Evaluation Form). New relationships were formed between NGOs. It is envisioned that with continued networking and follow-up, Albauian

14

and international NGOs can mutually benefit in the future through continued sharing of resources and experiences.

After the Forum, ORT-issued a second press release about the conclusions of the Forum. It was sent to the local media, local and international NGO, government institutions and ORT partners outside the country. The press release and sununary report were also published in Women Centre and Albanian NGO Forum publication (total 2,000 copies) and CRCA electronic publication (208 addresses).

Technical Assistance in the Drafting and Review of the NGO Law

During this quarter ORT continued to monitor the status of the NGO draft-law. In Augnst, ORT and ICNL concerned about the slow government progress in discussing the draft-law organized several meetings with Ministry of Justice, Council of Ministers and the draft law working-group. All of the government representatives present expressed their support of the draft, and promised to include the draft in the agenda of Council of Ministers by end of August. The common understanding was that draft will be amended with a couple of articles by the Ministry of Justice to allow its compatibility with the Civil Code.

In September, unexpectedly, the deadline to discuss the draft was postponed for the fifth time until the end of December 1999. At present, the government is asking the Ministry of Justice to review all Albanian Codes including the Civil Code as well. The government does not want to proceed with the draft law, until the review package is completed.

ORT called two meetings of the draft law working-group to discuss the current situation and the possible solutions. An ICNL consultant will visit Albania, and Demnet will organize a meeting with representatives from the Albanian Parliament, Council of Ministers, Ministry of Justice, donor agencies and NGO draft-law working-group. The meeting will take place in October 1999 to discuss the status of the draft and reasonslburdens that are preventing the draft law from moving forward, and the group will develop a strategic plan on how to push it forward.

ORT/uSAID Survey of Albania

During the last quarter, ORT published the Albanian-language version of the survey book and plauned to have a book release, but due to the Kosovo crisis it was temporarily postponed. ORT decided to include a presentation on the release of the survey book during the Interaction Forum. The two ORT staff, Lori Jenkins and Kalia Musha, gave a presentation about the drafting and administration process of the survey, statistical method data analysis and results. The book is expected to provide some directions to Albanian NGOs for their programming and policy initiatives.

At both the Interaction Forum and prior distribution, ORT has provided more than 150 copies of the Albanian-language version and about 300 copies of the English one. ORT has received very positive feedback from donors, Albanian politicians and government officials through telephones calls and formal letters.

15

NGO Media and Public Relations Training

The ORT Democracy Network Program in cooperation with IREX, a USAID-funded program working in the media sector, organized on September 21-23, the training on NGO Media and Public Relations. It was designed as a three-day training with lectures combined with small­working discussions.

The training participants were a mixed group consisting of 16 NGO representatives responsible for media and public relations and five local govemment officials, responsible for public relations in the municipality. ORT worked with PAPAJUSAID to identify the local govemment officials who could benefit out ofthis training and were open to the public and NGOs.

Some ofthe topics covered in the training were:

~ Purpose of the Public Relations ~ Utilizing Media to Reach Organizational Goals ~ Effective Communication Through Relationships. ~ Preparing Your Organizational Message ~ Reviewing Your Organization and Your PR goals ~ Strategic Public Information Planning ~ Determining the Proper Voice ~ Building a Comprehensive Message ~ Prioritizing Your Message ~ Managing Your Ongoing Public Information Campaign ~ Internal Media & Communication within Your Organization ~ Public Image Through Controlled&Uncontrolled Media ~ Ways How to Get Appropriate Media Attention ~ Developing Public Service Announcements ~ How to Write Press Releases.

During the three days the participants worked in four small working-groups (health & environment, municipalities, women's NGOs, rural) to design a media campaign on a group issue, to develop Public Service Announcements for their group and get prepared for an interview and press conference. As a conclusion to the training, some videos of Public Service Announcements from the US were shown. Also, NGO representatives played their public announcements which will discussed in the big group.

By the end of this training the participants were able to prepare their organizational messages, answering the questions such as: what is the purpose of your organization, what service do you provide, who uses those services, what is good about your organization and what do you need to improve, what message are you trying to communicate. They were able to determine the proper voice in the given message, as well prioritizing the most important things that the organization should express in the message. Additional written and visual information, like posters,

16

announcements, handouts were given to the participants on the support of their future public relation work.

A key component of the NGO Media and Public Relations training was a series of follow-up meetings with individual workshop participants. The purpose of these meetings was to offer personalized discussions of specific NGO challenges, problems etc. which might not have found an appropriate forum in a workshop setting. The NGOs have been encouraged in each of these meetings to discuss their own programs and the opportunities for utilizing public relations concepts in those programs. Ten of the NGOs participating in the workshop found time in their schedules to participate in these follow-up visits.

One of the lessons learned is that more time should be dedicated to on-site assistance. The trainer should spend more time to identifY the NGOs needs in tenns of a media and public relation strategy. The trainer should also assist the NGOs to devlop a media campaign as part of their policy advocacy campaign, when it is appropriate. Also, an Albanian co-trainer would improve the quality and practicality aspect of the training. This is one of the recommendations made by the participants as well.

At the end of the training an evaluation fonn was distributed to collect the participants' opinion about the training and their suggestions for improvement. Overall evaluation about the training was really good. Participants found it useful especially topics like" Developing Public Service Announcements" which are quite new concepts in Albania, "Building a Comprehensive Message", "Building Relationship with Media", "Dealing with the Bad News". More infonnation can be found to the summary evaluation fonn, attached to this report.

ORT is planing to organize other series of similar training combined with tailored technical assistance with other NGO groups.

NGO Management Handbook

During this quarter ORT published its handbook "NGO Management - A Manual for Albania" released at the Interaction Forum (a summary on the drafting process and manual content is provided in the last quarterly report.) The manual was produced in I 00 English copies and 200 copies in Albanian language. ORT plans to update the manual from time to time to reflect the changes in the NGO sector and legal framework. A questionnaire was distributed along with the manual to solicit suggestions from NGOs and individuals that will use the manual.

ORT distributed 200 copies at the book release event. Demand for the manual continues to grow, particularly from NGOs outside of Tirana After the release ORT, had to print an additional 100 copies in English. Some donors reqesting copies expressed a willingness to purchase the manual. ORT will charge a small fee to support the publication of additional copies of the manual.

In the future, ORT plans to work with ICNL to add sections related to legal implications for NGO capacitycbuilding.

17

ORT Publication "On the Road to Success"

ORT issued its first publication of "On the Road to Success" in September. This publication will be issued bimonthly, in English and Albanian language, and will highlight some of the ORT NOO success stories.

The first issue presents some of the ORT successes in terms of technical assistance, grant programs and pUblications. It also gives a short background of ORT Democracy Network Program in Albania. ORT has distributed more than 300 copies of the first issue. Copies were sent to local NGOs, government institutions, parliament, donors and media. This publication wiII be a tool not to simply publicize ORT successes, but also to promote the NGO sector as a whole, considering the current weak relationship between the NOO and media sector.

ORT has received several letters and phone calls regarding the publication from NOOs and deputies of the Parliament. They all congratulate ORT for its support and contribution to the NOO sector. ORT is still thinking about ways how to improve the publication. The second issue will also include a section on different NOO events in and/or out the country and general information about the NOO activities.

FURTHER ORGANIZATIONAL DEVELOPMENT OF ANTTARC

Participation in Training of Trainers Program

Two ANTTARC training consultants, participated in a Training of Trainers (TOT) program provided by the USAID/ORT Democracy Network Program In Partnership with the American ORT, conducted in Bosnia from July 5-16, 1999. TOT specific objectives included: understanding NOOs role in a civil society; using training and consulting techniques; improving process skills; development of models, strategies, and tools for designing, implementing and evaluating the Leadership Certificate Program. The TOT program included six two-day modules on topics related to NOO management such as: NGO governance; training standards; social skills; fundraising; organizational development; advocacy and policy. Participation of ANTTARC staff members in this program was beneficial not only for participant's professional development, but also for enhancement of ANTTARC's institutional capacity.

Advanced Training in Project Management

From August 15- September 20, 1999, one of ANTTARC's training consultants participated in a five week advanced international training program in project management, organized by Project Styrning ABC a Swedish consulting company specialized in project management and experienced in training of project managers and administrators and sponsored by Swedish International Development Cooperation Agency (SIDA). The purpose of the training program was to strengthen participants' capacity to guide a project to a successful completion. Main topics addressed during this program included: project management and administration focusing

18

on project phases and basic concepts, administration, goal setting, planning of time, resources, and costs, organization, follow-up and cost control; project management skills focusing on management skills and situational leadership, communication, delegation of work, project management situations, project team work; and special topics focusing on women in project management, project appraisal and feasibility studies, international procurement, and project financing. The program also included a project management game including planning, evaluation, and project presentation and study visits to ABB Stal, Swedish Environmental Protection Agency, and Public Roads Administration. Participation of the training consultant in this training program helped increase ANTTARC's institutional capacity related to project management and project management training and technical assistance. Employing knowledge and skills gained during the program, she will begin developing and delivering project management training and technical assistance to Albanian NGOs

Performance Evaluation Policy and Protocol Revision

Taking into consideration lessons learned by the application of ANTTARC's eXIStIng performance evaluation policy and procedures, training consultants worked on improvement of the protocol, instrumentation, and policies and procedures. Past experience reflected the need for simplification of existing and procedures in order to increase effectiveness.

Marketing and Public Relations Activities

Extensive efforts were made to ensure full coverage of ANTTARC' s activities in the media, Albanian as well as foreign. Coverage of the Board training retreat was provided on the news of ALBA TV, a private Albanian TV station, and MTN, a private Macedonian TV station. Also, the Albanian national radio emitted a detailed report on the Board training retreat. An article on the board training retreat was published in Albania newspaper. Albania newspaper also published a full-page article on the national survey conducted by ORT during 1997-1998. (See Attachments)

NGO Development, Leadership, and Strategic Planning Retreat for the Kosovo Youth Council and the Albanian Youth Council

ANTT ARC conducted a Retreat on Organizational Development of the National Kosovo Youth Council and Training on Organizational Development of the Albanian Youth Council from June 30 - July 4, 1999. Program participants consisted of 15 representatives of the National Kosovo Youth Council and 13 representatives of the Albanian Youth Council.

The program was designed to provide participants with knowledge and skills needed to establish an organization or restructure it according to international standards. Specific objectives of the retreat included: understanding of international NGO standards; development of mission and vision statements; development of organizational chart; development of statute and identification of steps toward registration; development of public relations materials; development of strategic plans; development of financial management system and action plan; understanding bylaws; and development of a policies and procedures manual.

19

The retreat lasted five days and required rigorous efforts on behalf of participants and training consultants. At the end of the retreat, participants from the Kosovo Youth Council had a better understanding of the role of NGOs and International NGO Standards. They also developed several operating systems and documents necessary and important for their organization including: mission and vision statements; a draft statute; the organizational chart; position descriptions and employee contracts; reporting procedures; short-term and mid-term goals and objectives; public relations materials including the organization's logo, letterhead, fax cover sheet, an outline of the press kit, introductory letter to donors; and a set of policies and procedures including personnel, administrative, financial, and transportation policies.

Bosnia DemNet Staff

During July 1999, two ANTTARC training consultants assisted with program documentation and reporting of a Training of Trainers (TOT) program conducted by the USAID Bill Democracy Network Program In Partnership with American ORT.

ORT Bill Democracy Network Program Staff Retreat

From July 26 - August 02, 1999 ANTTARC designed and conducted in Tirana an eight-day retreat on NGO Development, Leadership, and Strategic Planning for the ORTIUSAID Bosnia and Herzegovina Democracy Network Program staff Fourteen Bosnian staff members, including the regional advisor and American project director participated in the program. In addition to ANTTARC training consultants, Deborah Valencia of American ORT and Carrie Gruen10h of DemNet Hungary provided support.

The program was designed to provide participants with knowledge and skills needed to strengthen the organization according to international NGO standards. Training agenda and curriculum was developed based on the organizational and staff needs. Specific objectives were carefully developed. The fmal curricula took into consideration the fact that the participants had limited understanding of issues related to organizational development. Based on the curricula developed, the consulting team prepared a detailed agenda and manual for the retreat.

The retreat required rigorous efforts on behalf of participants and training consultants. During the retreat, sessions conducted were as follows: international NGO standards; NGO board of directors; strategic planning; statute and organizational chart; reporting procedures; strategic public relations campaign; employee performance evaluation; monitoring and evaluation; fundraising and revenue generation; financial management; policies and procedures manual; internal operating systems; and consulting skills. A one-day internship was also conducted at two Albanian NGOs: the Albanian Disability Rights Foundation and the Women's Center. The purpose of the internship was to allow the Bosnian staff opportunity to gain on-site experience in conducting organizational assessments, which they would be responsible for once returning to Bosnia.

By the end of the retreat the participants were able to increase their understanding of international NGO standards. They developed various materials for their organization including: mission and vision statements; draft statute; organizational chart; position descriptions and employment

20

contracts; reporting procedures; short-tenn and mid-tenn goals and objectives; public relations materials including the organization's logo, letterhead, fax cover sheet, an outline of the press kit, introductory letter to donors; and a set of policies and procedures including, personnel, administrative, financial, and transportation.

Pre-post evaluation was conducted at the beginning and end of the training program to measure progress in knowledge and skills. Pre-post evaluation showed that participants' knowledge was significantly improved and skills substantially developed.

CARE Training Session on Strategic Planning

A Strategic Planning Training Session was conducted from September 1 O-ll, 1999 in Kosovo, with the participation of 11 local staff members of CARE International-Kosovo. Participants represented headquarters as well as field offices. In addition, they represented different staff positions such as Program Development Officer, Office Manager, Fleet Manager, Administrator, Organizer, Field Officer, Assistant Field Officer, Warehouse Supervisor, Warehouse Manager, and Record Keeper. The training session was conducted at the CARE premises in Pristina.

The purpose of the training session was to provide participants with a theoretical framework on strategic planning and enhance their skills related to development of mission and vision statements, goals and objectives, and action plans and tirnelines. The training session's specific objectives included: understanding the role of strategic planning; understanding the process of strategic planning; understanding the process of development of vision and mission statements; understanding SWOT analyses; analyzing internal organizational strengths and weaknesses and identify critical issues; developing short-, mid-, and long-tenn objectives and action plans.

Comprehensive preparations were made for the training session. The training program was tailored based on identified needs reflected in the specific objectives. Also, specific conditions of Kosovo were taken into consideration. A training manual was prepared in both Albanian and English. Aiming at participatory sessions, not just theory, case studies and other practical examples of mission and vision statements, goals and objectives, action plans and tirnelines, etc. were included in the manual.

The training session was delivered by a team of two ANTI ARC training consultants who are highly experienced in strategic planning. The training manual was provided to participants in advance together with ANTTARC's catalogue that were used throughout the training process by participants during the total group discussions or work in small groups. Training was conducted combining theory and practice. Different methods were used to achieve the retreat objectives including brainstorming, total group discussion, lectures, small group work, and presentation. During the training, the training consultants facilitated the development of mission and vision statements, goals and objectives, work plans, and tirnelines by participants using CARE International-Kosovo as an example.

Pre-post evaluation was conducted at the beginning and end of the training session aiming at evaluating the level of improvement in knowledge and skills. Pre-post evaluation showed that participants' knowledge on the role and process of strategic planning, development of mission

21

and vision statements, development of SWOT analysis, development of goals and objectives, and development of action plans and time1ines was overwhelmingly improved. Participants also responded that their skills were substantially developed. A satisfaction survey focusing on training facilities, organization and administration of training, and training consultants' performance, i.e., knowledge, preparedness, responsiveness, written materials provided, etc.--was also conducted at the end of the training session.

A five-point Likert scale--from l(unsatisfactory) to 5 (totally satisfactory)--was used to measure the participants' satisfaction level with the above-mentioned elements. Participants rated training facilities 3.75, organization and administration of training 4.3, training consultants' performance 4.6. Pre-post evaluation and satisfaction survey served as a good source to identify training needs of CARE Intemational-Kosovo staff that could be met in the future.

22

LIST OF ATTACHMENTS

The Memorandum of Understanding Annual Work Plan September 1999 - May 2000 Interaction Forum Invitation Interaction Forum Agenda Interaction Forum List of Participants Interaction Forum Evaluation Form Interaction Forum Briefing Notes Interaction Forum Summary Evaluation Report "On the Road to Success" Publication Newspaper Articles on Interaction Forum NGO Management Handbook Evaluation Form Accumulative List c/o September 30, 1999 Media and Public Relations Summary Evaluation Report Employment Announcements (RDA, Tirana, DENA) Letters from ARD Tirana, ARD Elbasan, ADRF Newspaper Articles, "Albania's Road to Democracy" RDA Elbasan Documents

25

MEMORANDUM OF UNDERSTANDING

ORT Albania Democracy Network Program Rruga Mustafa Matobiti #16, TU"8na,A1bania Tel: (355 42) 47601 TellFax: (355 42) 476012

NGONAME Address

SUBJECT: MEMORANDUM OF UNDERSTANDING No.: SARC-

Dear Mrs.lMr. :

DATE

Pursuant to the authority contained in Cooperative Agreement No. DHR-0032-A-OO-5024-00 of June 12, 1995 signed between the United States Agency for International Development (hereinafter referred to as USAlD/Albania) and American ORT (hereinafter referred to as "ORT" or "Grantor"), ORT is pleased to enter into a "Memorandwn of Understanding" (MOU) with SUbrecipient's Name (hereinafter referred to as "SUbrecipient") to implement the Institutional Development Grant. This MOU is effective as of the date of this letter and will remain so until signature of the formal grant subagreement.

ORT agrees to organize and finance the activities outlined in the attached MOU while Subrecipient agrees to fully participate and support all activities. While this MOU is an agreement between ORT and Subrecipient, a third and significant party to this agreement will

. be, the Albanian National Training and Technical Assistance Resource Center (hereinafter referred to as "ANTTARC"), ORT's implementing partner in Albania.

ORT International Project Director, Celeste Scheib Angus 19t10 L Street, NW, Suite 603, Washington, DC 20036 (202) 293-2560 Fax: (202) 293-2577, E-mail: ortdc@aoLcom

Please acknowledge your receipt of and agreement to this Memorandum of Understanding by signing the original and all copies of this cover letter, retaining one copy for your files, and returning the original and remaining copies to the undersigned.

Sincerely,

Juliana Hoxha ORT Country Director

Acknowledged:

Subrecipient's Name

By:

Typed Name:

Title: President

Date:

2

I. PURPOSE

The purpose of this Memorandum of Understanding (MOU) is to enter into an agreement on behalf of SUbrecipient's Name to build institutional and leadership capacity through ORT's "NGO Development and Sustainability Program".

A. Background

The Democracy Network Project is a project of the United States Agency for International Development (USAlD) designed to develop and strengthen the community of public policy­oriented NGOs in Central and Eastern European Countries in four priority sectors: (I) democracy, (ii) the environment, (iii) economic growth, and (iv) social safety nets. ORT is the implementing organization which will carry out these development activities in Albania by providing technical assistance, training, and financial support.

ORT will provide a grant to the Subrecipient to finance both organizational development training and technical assistance and institutional costs. A select group ofNGOs was identified through an open, competitive application process. Four, including the Subrecipient, were chosen to participate in ORT's Program.

ORT's implementing partner in this program is the Albanian National Training and Technical Assistance Resource Center. ANTIARC will develop and provide all training and technical assistance throughout the duration of the grant. Under this MOU, the ANTIARC will be the primary provider of training and technical assistance to the Subrecipient.

The Subrecipient's description.

B. MOU Description

ANTI ARC will develop and implement the following activities:

On-site assessment conducted by ANTI ARC, Legal review and revision of statutes and legal status, Assess structure and status of existing Board of Directors, Recruit new Board members, Development through Board training retreat Post-board retreat follow-up to implement systems and procedures developed during the retreat, Develop budget and prioritize institutional cost, Assessment and requirement of additional staff.

3

II. RESPONSIBILITIES

A. ORT's Responsibilities

The specific responsibilities ofORT are as follows:

Manage financial grant,

Provide guidance and approval of systems and procedures for disbursement and control of all cash advances and liquidation reports,

Approval of systems and procedures for monitoring and evaluating activities including site visits and reviews,

Perform ongoing monitoring through periodic site visits and approval of implementation plans as well as through established reporting requirements in order to ensure compliance with the Subagreement to be signed within two months,

Conduct a final evaluation at the end of the Subproject.

B. Subrecipient's Responsibilities

The specific responsibilities of the Subrecipient are as follows:

Ensure full availability and participation of designated board and staff members for all MOU activities including all training and organizational development training and technical assistance components.

The Subrecipient and ANTI ARC will jointly develop and submit a budget, workplan, timelines and indicators to be detailed in the forthcoming subagreement.

C. ANTTARC's Responsibilities

The specific responsibilities of ANTI ARC are as follows:

ANTI ARC will work directly with the Subrecipient to develop and deliver all training and technical assistance components of the NGO Development and Sustainability Program.

4

III. BUDGET

The grant funds will be disbursed to ANTI ARC for all NGO Development and Sustainability Program expenses.

IV. EFFECTIVE PERIOD

The MOU is intended to be a preliminary agreement outlining responsibilities of each party. The effective date of this MOU is , and the estimated completion date of this MOU is . A formal subagreement will be issued within two months.

V. MONITORING AND EVALUATION

A. Baseline Report

Within the first two months, the ANTI ARC will conduct a second on-site assessment in order to collect baseline data to develop indicators which will be used to measure the progress of the

Subrecipient throughout the grant period. The Subrecipient and ANTI ARC will jointly prepare the baseline report for submission to ORT within 60 days.

B. Activity Report

The Subrecipient is required to submit quarterly progress reports ( enter quarters) within 10 days of the end of each quarter to ORT. ANTTARC will assist the Subrecipient in the preparation of the quarterly reports. A final report is required within 30 days ofthe completion of the grant.

C. Financial Report

The Subrecepient is required to submit monthly financial reports beginning month three of the grant period. All expenses incurred during the retreats will be documented and reported with assistance from the ANTI ARC.

VI. MEMORANDUM OF UNDERSTANDING REOUIREMENTS

A. Request for Cash Advance

The Subrecipient and the ANTIARC will jointly sign a "Request for Cash Advance" to be submitted to ORT.

5

VII. PUBLICITY AND PUBLICATIONS

The Subrecipient must send ORT copies of any press reports (including tapes for radio coverage and video for TV) related to the MOU activities and copies of any publication or research produced in the course of the MOU. The Subrecipient must state that support came from USAID through the ORT Democracy Network Program.

VIII. TERMINATION

If it is determined that the Subrecipient has failed to comply with the terms and conditions of this MOU, ORT may terminate the MOU at anytime. If financial assistance from the US Government is terminated at any time or for any reasons, it may become necessary to cease the MOU before the activities have been completed.

6

INTERACTION FORUM INVITATION

ORT Albania Democracy Network Program Rruga Mustafa Matohili #16, TIrana, Albania Tel: (355 42) 47601 TellFas: (355 42) 47605

30 August 1999

DeM. ____________________________ __

On behalf of lhe ORT Democracy Network ProgrMll, a project funded by U.S. Agency for International Development (USAID), on behalf ofUNHCR and OSCE as sponsors of this event and lhe members of lhe Orgaruzing Group, I have lhe pleasure of inviting you to attend lhe "Interaction Forum" on 16 and 17 September.

The Interaction Forum will be held at lhe "Tirana International" Hotel, on September 16-17, 1999. A Welcome ReceptioniDinner will be held for all forum pmicipants in lhe Humarutarian Information Center at lhe Pyramid building, lhe evening of lhe 16th.

The ORT Democracy Network ProgrMll, as a component of USAID since June 1995, is designed to strengihen and support lhe community of Albaruan non-governmental organizations lhrough grants, training and technical assistance. This ORT's initiative is pm of its technical assistance progrMll aiming to strengihen lhe institutional capacity of Albaruan civil society sector.

The goal oflhe Forum is to facilitate greater interaction between international and Albaruan NGOs. More specifically, lhe objectives oflhe Forum Me to identifY lhe needs oflhe Albaruan NGOs by sector; and, initiate working relationships between Albaruan and international NGOs, by identifYing some concrete forms of cooperation.

The idea of the Forum was conceived during lhe refugee crisis. Many international NGOs arrived in Albarua and struggled to find local NGOs to pMtner in lheir service delivery. Efforts to coordinate the work of NGOs, bolh international and local, often resulted in lopsided representation by international groups. At lhe SMlle time, Albanian NGOs commented on their willingness to get involved, but being left out of lhe process.

While many international NGOs have left Albarua, a significant number remain who are making lhe transition from humarutarian aid to development work. And, as before, lhese groups would appreciate local NGOs to pMtner in the implementation oflheir pro~ as well as strengihen local capacity.

The Forum participants will include more than 80 Albaruan NGOs, 30 international orgaruzations, 20 national and international donors operating in Albarua and representatives of local government. Media will be also invited.

ORT International Project Director, Celeste Scheib Angus 1900 L Street, NW, Suite 603, WashingtoD, DC 20036 (202) 293-2560 Fas: (202) 293-2577, E-mail: ortdc@lloLcom

Please, do not hesitate to call the ORT office for additional information. We look forward to your participation in our efforts to facilitate greater interaction between the international and Albanian communities.

Sincerely,

Juliana Hoxha ORT Country Director

Members of Our Forum Organizing Group

UNHCR, Community Services Rr. Donika Kastrioti, Tirana Tel.: 28474 or 50206, Fax.: 28492

OSCE Rr. Donika Kastrioti, Villa #6, Tirana Tel.:35993, Fax.: 35994

Humanitarian Information Center International Culture Center, Tirana

Albania ORTIUSAJD Democracy Network Program Rr. Mustafa Matohiti, Nr.16 Tel.lFax.: 47601 or47602

Albanian Youth Council Rr. Asim Vokshi, Nr.56, Tirana Tel.lFax.: 56493

Women Center Rr. Myslym Shyri, P.54, Sh.l, ap . .3, Tirana P.O. Box 2418 Tel.lFax.: 43526 or 23693

Foundation for Reconciliation of Disputes Rr. Him Kolli, Nr.45, Tirana Tel.lFax.: 32739

INTERACTION FORUM AGENDA

-yf

INTERACTION FORUM

AGENDA

16 September, Thursday: NGO Needs Identification

Registration of Participants .................................................. 09:00

Welcome Speech by ORT Democracy Network Program ........................... 10:00

Opening Remarks by Pandeli Majko, Albanian Prime Minister ...................... 10:15

Panel Discussion: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 10:30

"What the Albanian NGOs Need to Develop Their Capacities To Be More Effective"

Representative of Ministry of Labor and Social Issues Mrs. Valentina Leskaj, Executive Director of Albanian Family Planing Association Mr. lohan te Velde, SNV Project Director

Coffee Break ............................................................. I !:I 5

Albanian NGOs Needs Identification by Sectors ................................. 11:45 (For this part of the agenda, all the donor organizations and international NGOs will participate with an observer status)

Discussion in Sectoral Working Groups: Democracy, Economic Growth, Social Safety, Environment

Lunch Break. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 13:30

Sectoral Working Groups - continued . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 15:00

Coffee Break ............................................................. 16:00

Plenary Session. Reports from Sectoral Working Groups .......................... 16: I 5

Book Release: "Albanian's Road to Democracy" ................................. 17:15 A Publication ofORTIUSAID Democracy Network Program

End of Day One .......................................................... 17:45

ReceptioniDinner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 19:00 At Humanitarian Information Center, Pyramid Building

17 September, Friday: Building Partnerships

Registration of Participants .................................................. 08:30

Welcome to Second Day ORTIUSAlD Democracy Network Program ................ 09:00

Presentation of Two Successful Partnerships Between Albanian ..................... 09:05 and International NGOs

Albanian Youth Council - Altin Goxhaj, President ARCS - Nicola Mai, Coordinator

Donor's Panel Presentations .................................................. 9:30 USAlD, World Bank, UNDP, EU, SOROS

Open Discussions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 10: 15

Coffee Break ............................................................. 10:45

Building Partnerships Between Albanian and International NGOs . . . . . . . . . . . . . . . . . . .. 11: 15

Discussion in Sectoral Working Groups: Democracy, Economic Growth, Social Safety, Environment

Lunch Break. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 13 :30

Plenary Session. Reports from Sectoral Working Groups .......................... 15:00

What's Next? ., ......................... , ................................. 15:45

Forum Finishes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 16:00

2

INTERACTION FORUM LIST OF PARTICIPANTS

ALBANIAN NGOs

NGONAME

WOMENNGOS

1 Women Center

2 "Refleksione" Women Assoc.

3 Albanian Women Independent Forum

4 Family Planing Assoc.

5 Counseling Center ror Women

6 Useful to Albanian Women Assoc.

7 Lawyer Women Assoc.

8 "Renewal" Women Assoc.

9 Law, Business and the Right of Rural

Women Assoc.

10 "Fashion in help or women" Assoc.

II Intellectual Women Assoc.

12 Albanian Women Federation

13 "Women for Social Activity" Assoc.

14 "Protection of Mother and Child" Assoc.

15 "Proressionaland Business Women"

Assoc.

16 "Business Women" Assoc.

17 Women Legal Studio

18 "Mother of orphan children" Assoc.

19 Women and the Family Commluee

20 Young Women's Christian Assoc.

"'?J-"

LIST OF PARTICIPANTS IN THE INTERACTION FORUM

SEPTEMBER 16-17, 1999

TIRANA

ADDRESS CITY PHONEl

P,O.Box 2418 Tirana 43526

P,O.Box, 2412/1 Tirane 39523

Rr.Reshit Collaku, NT. I 00 Tirane 28309 or 47269

Rr.Kavajes, PJ. Shk.6, Ap.24, Tirane 24269 or 51475

P.O.Box.241611 Tirane 33409

Rr.Naim Frasheri, No.6 Tirane 23001 or 47502

Rr.Vellczrit Manastirliu, P.II. Shk.!, Ap.12 Tirane 395580r29751

Rr.Elbasanit, NO.7 Tirane 25728 or 30395

Rr.Shyqyri Berxolli, Nr.78/1 Tirane 39526

P.Shailvareve. ShkJ,Ap.32 Tirane 33847

Rr.Migjeni,Nr.46, Puke 641802413(0)

Rr. Mihal Grameno, Nr.68 Tirane 28582 or 30560

Rr.Budi, P61/2, ShU, Ap.21 Tirane 33432

Rr.Mihal Grameno, NT.55 Tirane 30560

Rr.Dum".sit, former Court Room Building, Tirane 357260r42833

Room Nr.9

District Council, Business Office, III Floor Vlore 6322769

P.O.Box 1549, Rr.Myslym Shyri, P.44, Sh.4, Ap.l9 Tirane 321490r 28034

Rr.Kavajes, Llbri dhe Filml "Nalm Frasher!" TirRne 30916

Building, P.D.Box 2415

Tirane 47572

Rr.Kostandin Kristoforldhl, #4 Tirane 51369

FAX EMAIL

[email protected]

rdaf@albaniaonline

51369 [email protected]

Please, contact the Forum's Registration Desk for updates and corrections Page 1

CONT_ PERSON POSlTlON

Englantina Gjermeni Executive Director

Milv8lkonomi President DianaCuli President

Valentina Leskaj Executive Director

Silvana Miria Development Director

Ada Fishta

Vjollca Mecaj President

Alma Jani Project Manager

Ahmedije Daci President

Linda Paruea President

Mirela Sula President

Suzana Turku President

Mira Xhebraj

Lajls Pemaska President

FJulura Laknori President

Silva Barci Coordinator

IIdiz Ibrahimi President

ArJana Fullan! Executive Director

An&!elina Dine Prcsidcnte

BOlnlido Gjonl

Brunilda Noka

21 Women, Reality, Vision Assoc.

22 Ex political prisoners Women Assoc.

YOUTHNGOs

23 Youth Centre

24 Albanin Youth Council

25 Youth Center ---':C Youth Center 26

27 Youth Center "4 Rooms" ~AlBi&

SHSRSHS&SHIIA&OSPES

28 Youth Center

29 Youth Center

30 Rural Youth Social-Cultural

Development Assoc.

31 Jehona Association

32 Albanian Environmental Studcnt's Club

33 GALEN (The Club of medical students

and young doctors)

ENVIRONMENTAL NGOs

34 Albanian Aero~Club ·Shqiponjn'"

35 Transborder Wildlife .. \ssoc.

36 Assoc. of Protection and Preservation

of Natural Environment· Korce

37 Environmentalists Libra:thd

38 Kadml and Uarmonla

39 Tourism and Environmcnt Assoc.

40 Assoc.of Protection and Preservation

or Natural Environment - Shkodra

41 Foundation "The Forest for people"

42 Aquarius

43 Environmelllill Youth Club "Pcarl"

~

Ti~ane 52369 63016

Tirane 44569

Vlore

Rr.Asim Vokshi, Nr.56 Tirane 56493 56493 [email protected]

Rr.Asim Vokshi, Nr.56 Tirane 56493 56493 [email protected]

Art School "Jan Kukuzeli" Durres 05224962

Lagja "Ndoc Mazi", Rr.Skenderbeg, # 145 Shkoder 02248062

Ex-Children Culture Center Gjirokas 07266270

Palace ofCuJlure,)( Floor Korce

RrJani Vreto, Nr.14 Tirane 30893 30893

Rr.Mihal Grameno, P.7814, Sh4, A.SO Tirane 33935 23987 ·[email protected]

Rr.Bajram Curri, perballe pallateve Agimi Tirane 42598 or 54652 42598

Rr.Shinasi Dishnic8, #71 Tirane 33065 or 29557 dorela [email protected]

Rr. Pandeli Calc, Nr. 26 Korea 08243037 [email protected]

Lgj. 12, Rr. Gjergj Kastrioti, P. 21N) Korea 082441 81

Lgj. I Librazhd Librazh 05522272 5453535

L, 2, p, 132/1 Pograde 08322733

Rr. Kajo Karafili, P. 82 Pograde 08322309

Lgj. Vojo Kushi, RI. Clirimi. Nr. 67 Shkodra 02243688 02243747

Rr "Urnni Pano" , Nr 14 Tirana 382020386 51107

Rr. Ali Demi, P.249,shk.S, Ap70 Tirana 71435 or 64322 27711 [email protected]

Rr, Myslym Shyri, p, 53/1, Ap, 9 Tirana 250180r23116

Please, contact the Forum's Registration Desk for updates and corrections Page 2

Rajrnonda Priftj

Mirnoza Dajci General Secretary

Elidon Lamari Coordinator

Altin Goxhaj Chairman Genci Mucollari

Bajana Ceveli Coordinator

Albri Brausha Coordinator

Alketa Qendro Coordinator

Nairn Lushaj President

Dritan Pirdeni President

D10ni5 Sroka

Dorela Haxhiademi Coordinator

Frederik Tashko

Stavri PIIMa Director Bardhyl Panolli President

Feril Hysa President

Artan Bilincl Chairman

Sokol Ziko

Fatbardh Sokoll

Arben Peuo

Andrian Vaso Executive Director

Valbonll Shutlnn

Anlla Paparisto _._--

44 Masmedia and Environment Assoc. Rr. G. Domi,P. 2/21 Tirana 65229 or 64100 65229

45 Albanian Biologists Assoc. Tirana University Faculty of Natural Sciences Tirana 269610r 25454

46 Environ. Assoc. Air.Land·Water L&i. 9, BUoku Vasil Shanto Tirana 273 60 [email protected]

47 Assoc.for Protection and Preservation Rr. Asim Vokshi, P. 33, Sh. 4, Ap. 7 Tirana 22839 [email protected]

of Environmental Nature in Albania

48 Assoc.of Inland and Coastal Rr Durresi, Nr. 219 Tirana 24790 24790

Water Conservation and Protection

49 National Assoc. of I-Iygenists Rr. Mine Peza, P. 248, Ap. 9-, Tirane 29322 or 34230 63553 [email protected]

DEMOCRACY NGOs

.-SO Center for Ihe Parent's Involvement Bulv.Zhao O'ark, P.6118, Shk.I,Ap.1 Tirane 46814

----- =:---- -~-"

51 ORT Kosovar Refugees Training Progrs Rr.Mustafa Malohiti,lI..2 6 TIrane 47603 47604

52 Children's Humlln Rights Center of Alb. P.O. Box 1738 Tirane 30760 30760 [email protected]

[email protected]

[email protected]

53 Albanian Consumers Assoc. Rr.e Kavajes, II 63, Kati I Tirane 39269

54 ANTTARC Rr.Mustafa Matohiti, II 16 Tirane 47603 or 47604

(Alban.National Training&Technical

Resource Center) - -.----------- ---- -

S5 Albanian Helsinki Committee Rr.Sam~~~_~:!~~20/1, Sh.b.'_~~ ___ ~._.~ ____ Tirane 40891 33281 -_._._---56 Albanian Human Rights Center Rr. Kont Urnni, Nr.IO Tirane 30630 30630

57 Albanian Group for Human Rights Bulevardi Bajram Curri, Perballe pallatcve Agimi Tirane 47658

58 Society for Democratic CuUure Rr.Mihal Duri, II 60/1 Tirane 30350

59 Albanian Assoc. of the Atlantic Pili ac:. of Con~=-~cs,!}. FI~?! Tirane 64659 64659 a mo isi [email protected] ._---. ----- --------. 60 Antimining Com~~!,~.~.!._" .. _. ___ . _____ .. __ . __ ,~~~_~~~_.~~afa, .. ~~._~ .. ~.:,~~_?Q_~ _______ , _______ . _______ . Ourres 05222505 [email protected] _.----,,_ .... _._-- -, .. ---~-~ 61 Democratic Union of Alban. Uonm • Rr.Margarit8 Tutula~_~ 1'.23, ~h.3~~~~ ____ _____ Tirane 30585 30585 ---_ .. _------- -- ---------~"

Amaro Divas ---------- ---~~ --- --_.-. , .. " -.. -----_ .. --- .... __ .. - ---.--.---.- ... ---.--,-----".-.-,--~ .. - ----, - ---"--,,._-

62 Democratic Union of AlbRn. RomR • Rr.e KnvaJes, Shlepia Botuese Nairn Frasheri, _.~_e 48925 48925

Amaro- Drom 111 Floor

63 Piece through Justice Rr.lsm,il (l,m,li, PJO, Shk.l, Ap.2 Tirane 26571 dk umbaroptj@albnninonline.

64 Albanian Media InstUute Rr.Hirn Kolli, Nr.45 Tirane 29800 29800 -65 -~---~-.-.---.. --

DeMeTre Tirane -- ---- ._- ~~~~ .""~~~~-~ --= - ~-------- -~-"~-- - - ~=.--- --

H:J

Please, contact the Forum's Registration Desk for updates and corrections Page 3

Xhemal Mato Chairman

Artan Trebicka

Salvatore Bushati

Leke Gjiknuri President

NevilaJona

Ndoc Rrakaj Zv. President

Lumturi Shehati President

Margarita Kristo Board Member

Sierta Hoxha Center Secretary

Eduard Prodani Director

Allin Hazizaj Co-Director

Islam Cani President

Edmond Spaho Executive Director

Arben Pulo Executive Director

Erinda Sliaea

Premto Goga Deputy Director

Miranda Gace Executive Director

Alfred Moisiu

Besnik. AlibaJi

Mina Qirici

Skender Veliu President

Daiena Kumbaro Coordinator

DJana KalnJa Shef I Knblnetit

Anduenll Shkurtl Coordinator

66 League of Pensioners of Albania RrJani Vreto, Nr.14 Tirane 60788 (H) Petrit Shehu President

67 Local Coordinative Forum of the NGOs L.AqifPasha, P.77/S Elbasan Shpresa Baja President

68 Legal Advice Service Rruga e Elbasanit, #38 Tirane 74445 Rozeta Shembilku Executive Director

69 Department of Social Sciences University of Tirana Tirane Adem Tamo

70 Assoc,of eomune Lcadcrs Petrcla eomune Tirane 22935 or 37050 Agton Haxhimali Secretary

71 Assoc.of District Council Chiefs District Council Tirane 24217 Hatixhe Kellezi Chairperson

72 Albanian Red Cross Rr.Muhamet Gjollesha Tirane 25855 or 22037 27508 Shyqyri Subashi President

Zamir Muca ShefI Sek. Komun·,k. - ----------------- ---------------------- ------l=:::.:':.=--F:.:..:.:==="'-73 Assoc, of Cedartr>·· Ccrantology Rr,Mine Pcza, P.I, Shk.I,Ap.6 Tirane 26423 or 32200 Ymer Haveri President

74 Assoc. of Public Health Rr.Sami Frasheri, r.13/1 ,Ap.8 Tirane 27973 or 38066 38066 Adriana Bardhoshi Presidente

75 Albanian Paraplegic Assoe, 'Rr.Zhan O'Ark, P.2, Sh.l.Ap.7 Tirane 63287 63287 Agim Gjoncaj President

76 Albanian Hemophiliac Assoc. Rr.Kongrcsi I Permeti!, Skender L1cshi Enterprise Tirane 254170r 39719 Vera Minga President

77 Albanian Palicnts Association Rr.Vellezerit Manastirli, # 3/3 Tirane 26423 26423 Paulin Benusi ---~--- .-.-~

78 Albanian Disability Rights Foundation Rr.QaOlil Guranjaku, # 19 Tirane 33530 33530 Suzana Sakiqi Executive Director

79 Albanian Blood Donors Association Rr.Teli Ndini, # 667 Tirane 67778 or 66688 Skender Hekuri President

80 "Health for all" Foundation Rr.Shinasi Dishnica, #71 Tirane 33065 or 29557 Taliana Daei Executive Director

81 Albanian Carilas Rr.Don Bosko Tirane 30088 or 34327 [email protected] Segundo Tejado General Director

-~ ~---~------------- --~---------------------~- ---- -------j---+-------+----t-----BUSINESS NGOs _______________ ----------------------t-~-_+--~~----+~----+------

82 National Union of Albanian Farmers (VOCA office), Rr.Jul Varibova, Nr.6 Tirane 50934 Nesti Zoi President

83 Research Center for Rural Develop, P.O.Box 1752 Tirane 63772 or 30022 [email protected] ZefGjeta

84 Dairy Enrerpreneurs National Assoc. Rr.Gjin Buc Shpata, P.e Aviacionil, Shk.7, Ancksi V Tirane 406460 r40647 40646/47 [email protected] Lavdosh Ferruni Executive Director I

85 Center for Economic and Social Studies Rr.Mihal Durl, P.60, Sh.t, Ap.5 Tirane 25316 [email protected] Vilma Kolpeja Researcher

86 Albanian Center for Economic Research Rr.Abdyi Frasher!, P.4, Shk.3, Ap.24 Tirane 29069 or 25021 [email protected] Ledia Muco Coordinator I

t--S7 Albanian Vocational Education and Rr.Fadii Rada, P.Rruga Ura, Sh.2, Ap.12 Tirane 250510r 25225 Vladimir Rumano Board member I ---- ------- ------ ---_ . ____ !.~~I.~i~~~:~c. . __ ~___ _____ _ I

~

Please, contact the Forum's Registration Desk for updates and corrections Page 4

INTERNATIONAL NGO·S

NAME OF ORGANIZA nON

88 AMURT

89 Bethany Christian Services

90 Children's Aid Direct

91 CAFOD·:\LDANI,\

92 CARE

93 CARITAS INTERNATIONAL

94 CORDIZOA Joint Venlure in Alb.

9S International Catholic Migration

Commission

96 International ]\Iedical Corps

97 International Rescue Committee

98 NGO Focus Point

99 OXFAM

100 Plan InternalionHI

101 Save the children Albania

102 World Vision

103 ADIIA

104 Catholic Relief Services

~

ADDRESS CITY PHONE FAX E·MAIL

Rr.Kongresi I Permcti! Tirane 26825 or 74691 amurt,al@amps,org

P.7916, Ap.52

Fshati SOS Tirane 23420 39297 [email protected] Rr.Jul Varibova # 6 Tirane 51015 or 57224 cad@icc,al.eu.org

Rr.e Dibres # 139 Tirane 35463 47662 [email protected]

Rr.Elbasanit, tll31 Tirane 71423 [email protected]

Rr.Don Bosko Tirane 4327 or Mob.0382027874

Rr.Aleksander Moisiu, # 2S Tirane 67815 or 038 2029905/6 [email protected]

Rr.Skendcrbcu, f/41 Tirane 37622 [email protected]

Rr.Jslam Alia f/ 12 Tirane 57185 or 57190 [email protected]

Mob. 0382027090

Mob. 0382029810

Mob. 0382029811

Tirane 35988 [email protected]

Tirane 42385 [email protected]

Rr,Frosina Plaku, 2/1 Tirane 56449 or 24525 [email protected]

Rr.Pjcter Bogdani, # 4 Tirane 33766 or 33787 [email protected]

RT. Nikolla Tupe, 1/ I Tirane 574160r57417/8 54719

P.I Xhambazeve, ShkJ

Rr.Perls! Rexhepi, Pall.12, Tirane 080 or Mob.0382029257 57078 'ulinn-srodcki@wvi,org

Ap.6

Rr.Deshmoret e 4 Shkurtit, Tirane 56690 or 56687 28611 Adra@icc,eu,org

P.26,Shk.1 ,3d Ooor

Rr,Mustafa Matohltl, 114 Tirone 34699 or 34699 40144

Please, contact the Forum's Registration Desk for updates and corrections Page 5

CON. PERSON POSITION

Donald Nelsen Country Representative

Agim Xhumari Executive Director Val Evans Ac.Country Represent. Shkelqim Bozgo Executive Director

Brikena Samara Vice Director

Charlie Earle Coordinator

Terry Dutto

Margriet Wilbrink

Kiki Van Kessel

Magnus Wolfe Murr Country Director

Rupert Wolfe Murray

Hilda Banka

Luli Gjeka Country Representative

Enlda Jorganx.hi

Sigmund Karlstrom Program Director

Julinn Strodeeki

Mary Philips

Jcnifer Oldam Office Representative

105 COSPE

~~ 107 ~:S_ PAPA

108 Humanitarian Information Center

109 Balkan Sun Flowers

110 ]'rlilieu Konh\kt OOST Europa

III Handicap International

112 Organization for the Support of

Albania's Abandoned Babies

113 RKT Marketing

114 The European Children Trust

-""'- _._------,---" 115 ABA/CEELi

DONORS ORGANIZATIONS

NAME

116 USAID

117 ORTIUSAID Democrac)'

Network In Albania

118 American Embassy

119 World Bank

120 UNDP

121 SNV

--~~ _ .. _ .. ""'--, -,-~~-

122 EU Phare I'rogram

I 123 ..

UNIICR 1--- ___ ~ .. ".oo_._._' __

.. y:;''>o

Tirane 31798(H) or 50731 50731

Rr. Reshit Collaku, # 100 Tirane 28181 .-~ .. ----

HOlel Rogner Tirane 32524 or 35010

Piramida, Tirane

Rr.Myslym Shyri, #120 Tirane 42340

Rr.Frosina Plaku Tirane 21537 21537

Maternity Hospital Tirane 32874 32874 -Bulv.Deshm. E Komblt

Contact at rREX Tirane 47544

Rr.Abdyl Frasheri Tirane 24063

----. ._.-". Rr.lsmnil Qem_ali,# 30 Tirane 31197 ----,.- --

ADDRESS CITY PHONEI FAX E-MAIL

American Embassy Tirane 27805 or 27852 32222

Rr.e Elbasanil, # 103 [email protected] -Rr.Mustara Matohlli, #.16 Tirane 476010,47602 47602 [email protected]

--_.---_.-.,--,,_ .. __ ".-0."-

Rr.e Elbasanil, # 103 Tirane 27805 or 27852 32222 -Rr.Deshmoret e 4 Shkurtil Tirane 300170r40588 32332 [email protected] . -.----------Vila 34 405890,28657

-""--~'"-- ,-_ .. _-. Rr.Deshmorel c 4 Shkurtit Tirane 331220r33149 32075 elleva. [email protected]

331480,33148 34448 -----C"---

Rr. c vilavc Gjcnnonc, #.8/b Tirane 28873 or 35235 71559

P.O.Oox 1735 71558 or 71560 [email protected].\.eu.org ,-~~--~ , .. _." '"-"'-'---"' ""- --_.

Rr. Donikll Knslrioli, 11.42 Tirane 28320 or 35894 30752 [email protected]

--.-. -~-

~ 2603 lor 26031

Rr.Donikn Knslrioli lrarle 28474 or 50206 28492 '''---'"-'' '"0'0' --.---

502070r 50208

Please, contact the Forum's Registration Desk for updates and corrections Page 6

Deborah Angeli Representative NicolaMai

Ejonta Pashaj Expert

Elleonore Monbiot

WamKat Director

Paul Kosterink

Rita Van Keulen

Benoit Loridan Program Director

Enkclejda Hoxhallari Country Director

~ila Thieme Consultant Suzana Sakiqi Program Manager

Treror Williams Program Director A.Graham Liasior

CON. PERSON POSITION

Howard Sumka Mission Director Charlotte Walson Democracy Officer

Juliana Hoxha Country Director

I.McAteer

Lida Kita Project Officer

Luisa Chiodi Consultant

Etleva Vertopi Program Assistant

Johan Buwald Project Manager ooan 1, V".,

Linda Gjcrmani Project Director

Kamelia Daja Project Officer Ddlnn Toln Project Officer

Thnrn Meechubot Office Representntivc

Terry Pitzner Community Services

124 UNICEF

125 Albanian Civil Society Foundation

126 Know How Fund

127 OSCE

128 Regional Environmental Center

for Eastern and Central Europe

129 SOROS

130 AEDP Soros

131 GTZ

132 Canadian International Development

Agency

133 Department for International

Development

134 E~IG IGOA

135 Council of Europe

136 UNFPA .--------~-.- ---.--.--.--'-.---"~-----.

GOVERNMENT REPRESENTATIVES

137 J\-linislry of Labour and Social

Protection

138 Ministry of Foreign Affllirs ---

Yy

RI. e Elbasanit, N#.l25/1 Tirane 27500 or 32263 30028

Rr.Asim Vokshi, Villa #137 Tirane 38056 or 38056 38056 [email protected],ai

British Embassy. Tirane 34975 or 34974

Rr,Skendcrbeu, # 12 34973 or 34973

RI, Donika Kastrioti, Vila # 6 Tirane 35993 35994 osce I [email protected]

Rr.Durresit, Pall. I I ,Shk.2 Tirane 39444 39444 [email protected]

Ap.12

Rr.Pjeter Bogdani, Pall,23/t, Tirane 346210r34223 35855

Kati I II 35856 or 35856

Tirane 35071 ext 114

Tirane 50032 gtzofficetir@albaniaonline,n Rr,Deshmorct e 4 Shkurtit Tirane 57275

P.7/1, Sh.1

Rr.Skenderbeu, 1/ 1, P,II katesh Tirane 37756 or 5758213 57584

Kati III

Kryeministria, Tirane 382032378 or 56568 [email protected],org

Tirane 28419 .--

---_._-Rr,Oonika Kastrioli. Vila 111 Tirane 57838/39 or 32283 -'-.,._-_._-----_-.._._.------_.-_ ... .- --_ ... ---.------~ ------~----"

..

- ._----_._-Tirane 33425

Tirane 64090 extl53 62085 - -----~-

Please, contact the Forum's Registration Desk for updates and corrections Page 7

Supervision CoordinatOl

Roberto Laurenti Office Representative

Pandeli Theodhori

Catherine Jones KHF Representative

Penny Martin NGD Coordinator

Mihallaq Qirjo Director

Capajev Gjokutaj Executive Director

Elizabeth Whisnant Program Specialist

Ismail Beka Coordinator Alban Joxhe

Tony Conlay Head of Office

Thomas Carmody

Mats Lindberg Special Representative 0

Secretary General of the

Council of Europe Katy J, Shroff UNFPA Representative Manuela Bello Program Officer

Kadri RIapi Minister

Soli Noti

Genti Bendo

INTERACTION FORUM EVALUATION FORM

INTERACTION FORUM, SEPTEMBER 16 -17, 1999

EvALUATION FORM

Please take a few moments to complete this fonn and drop it in the box at the registration desk. If you do not have a chance to fill it out now, please take it with you and fax it to (42) 47601/02 or mail it to ORT Democracy Network Program, Rr. Mustafa Matohiti, Nr.l6, Tirana Thanks for your input.

NAME & ORGANIZATION (OPTIONAL):

1. Which plenary sessions were most effective or interesting to you and why? Speakers (which ones)?

Topic?

Fonnat?

2. How did you like the welcome dinner on the first day? Please comment.

3. How useful did you find the "infonnation comer" at the Forum? Please comment.

4. Did the small working-groups and plenary sessions adequately addresses the overall Forum theme? Why and Why not?

5. How was your overall experience at the Forum ? __ --'horrible not great adequate ___ .bgood ____ e.xcellent

1

6. What did you expect to experience at the Forum ?

7. Did the Forum meet your expectations?

8. If you could change one thing, what would that be ? Why ?

9. What are some Forum's follow-up activities that you would recommend?

PLEASE RATE THE FOLLOWING (EXCELLENT, GOOD, FAIR, BAD.) PLEASE COMMENT:

Location, ____________________________________________________________ __

Fonnnhrul ____________________________________________________ ___

Nierus ________________________________________________________ __

Fonnn registration desk. _________________________________________ ___

Facilitation in smrul working-groups, ________________________________________ __

General comments and suggestions*

'PLEASE REMEMBER THAT WE DO USE THESE EV ALUA nON FORMS WHEN PLANING THE FORUM'S FOLLOW-UP ACTIVITIES. IF YOU HAVE A SPECIFIC IDEA ABOUT A WORKSHOP OR THEME THAT YOU WOULD LIKE TO SEE ADDRESSED, PLEASE CONTACT THE OFFICE OF ORT DEMOCRACY NETWORK PROGRAM.

2

INTERACTION FORUM BRIEFING NOTES

Briefing Notes for the Participants in the Interaction Forum

The following covers all final arrangements concerning your participation in the Interaction Forum, which will be held in Tirana at the Tirana International Hotel, "Balsha" Hall, from September 16-17, 1999.

Venue The Interaction Forum will be held at the Tirana International Hotel, Tirana, Albania Tel: 34185 or 34447; Fax.:34 188

Transportation The sponsors will reimburse all travel costs for outside Tirana participants. The participants should present to the ORT staff the travel ticket.

Accommodation o RT has made reservation for all participants from outside Tirana, details of which you will receive at the ORT office, on Wednesday, September 15, 1999, between 15:00-17:00. The cost of your accommodation will be covered by the sponsors. This includes sleeping accommodation for two nights (September 15 and 16), breakfast at your hotel each morning, lunch and dinner on the first forum day, and lunch on the second day. The per diem for the participants from outside Tirana for the dinner of September 15, will be paid at the ORT office, on Wednesday 15, 1999. Please note that sponsors will not reimburse taxi expenses or other expenses, such as telephone or minibar. Each participant must pay directly to the hotel upon departure.

Registration We will begin registration for all forum participants at 9:00, on Thursday, September 16, 1999. We request that all participants register no later than 10:00, on Thursday. At registration you will receive a forum packet, which will include a conference notebook, a name badge (which we request would be worn at all times in the forum area), list of invitees and other forum documents.

Information Corner All participants are invited to display their promotional materials and 1-2 page summary of their organization activity, in English. This "Infonnation Comer" will be during both days of the forum. Please, provide enough copies for people who want to pick up your infonnation.

Welcome Reception A Welcome ReceptioniDinner will be held for all conference participants in the Humanitarian Infonnation Center, at the Pyramid Building, beginning at 19:00, on Thursday, September 16, 1999. At the reception we will have guest speakers from Albanian and international NGOs. We look forward to seeing you there.

Language The languages for the Conference will be Albanian and English. Simultaneous translation will be provided between these languages.

Any Further Questions If you have any problem or questions related to the above infonnation, please do not hesitate to contact: ORT Democracy Network Program, Rr. Mustafa Matohiti, Nr.l6, Tel.lFax.: 47601 or 47602.

INTERACTION FORUM SUMMARY EVALUATION REPORT

INTERACTION FORUM

September 16 - 17, 1999

EVALUATION FORM

1. Which plenary sessions were most effective or interesting to you and why?

Answers: The second one.

Speakers (which ones) ?

Comments: Panel discussions. Johan te Velde, Lida Kita Capajev Gjokutaj, Johan te Vel de, Lida Kita Etleva Vertopi Valentina Leskaj Etleva Vertopi Etleva Vertopi All of them, Vjollca Mecaj, Juli Hoxha Etleva Vertopi, Lida Kita, Howard Sumka Ms. Bardhoshi, mr. Qiljo Several reports to the small working groups. Johan te Velde, Valentina Leskaj, Capajev Gjokutaj Reports from various sector meeting Valentina Leskaj, Capajec Gjokutaj and Juliana Hoxha Donors. All speakers were pleasant and their discussions were interesting, especially the second day were donors like UNDP, WP, Soros and USAlD presented their work. Good in general. Juli Hoxha LediaMuco Summary of partnership issues session Juliana Hoxha Etleva Vertopi Howard Sumka Donors'panel presentations. Etleva Vertopi

Topic? Comments: • What the Albanian NGOs need to develop their capacities to be more

effective • Economic Growth • UNDO donations

Fonnat?

• Needed infonnation about the UNDO procedures, how it has operated and how it will in the future.

• Partnership evaluation • The sector breakout sessions- it was interesting to hear the different

viewpoints on the questions posed by facilitators. • Working group discussions. • The picture ofNGO needs. • Needs ofNGOs • About the partnership NGO-donors. Support for institutional

strengthening inside and outside the organization is needed. • Donors' panel, in general. Especially the speech ofCapajev Gjokutaj. • Evaluating the partnership. • Media's role - Democracy. • Needed infonnation about UNDP and the way how it proceeds and

it will proceed with the third sector support program. • Democracy, Working groups

Answers: lohan the Vel de, practical. The donors viewpoints and plans. It was clear.

2. How did you like the welcome dinner on the first day? Please comment. Comments:

• The food was good, But I was expecting some presentations. As far as I kuow nothing happened. Not well organized, was more like a "hopsnack" real.

• Yes, it was well organized but the place was very limited and hot. • Very good, many assortments, free to choose, excellent service • Not enough participation. • The welcome dinner was something special. It was a logic continuation of the forenoon

activities. Interesting presentations, and it helped to increase the contacts. • I don't know. I didn't participated. • Yes, but the participation of donors' representatives was needed. • I didn't participated. • Not present. • Yes, very much. • Yes, it was well-organized. Have the possibility to meet people from other organizations and

donors. • Very nice • The dinner was nice. • Yes. • I liked it very much because we could know with the HIC and gave us the opportunity to

know each-other.

• Yes. • I didn't participated. • I liked it very much, but I think that more participation couId be assured. The hall was too

hot. Perhaps the small place detennined the missing participation.

2

• Well-organized. Perhaps more space was needed. • Very good, but dancing was missing. • Excellent. Everything was done in the right time and place. The presence of the American

Ambassador make the dinner warmer. • Thank you, it was the place where we expected to make new appointments , and new

contacts with VIPs, but we had not this chance. • The dinner was very nice, but the hall was not the proper place to taste it. • Good idea. But the hall very small and not well-aired. • Very good, very nice food and the service presentation. • Excellent. • Well-organized because we had the chance to talk with everyone. • Another way to put contacts.

3. How useful did you fiud the "information corner" at the Forum? Please comment..

Comments:

• Useful, can be ever more next time. Maybe some information board including pictures on the wall (each NGO), each NGO can make hislher own visual presentations.

• It was very useful, but probably an additional desk would be needed. • Very useful • Useful. We took information from all the participants. Some editions were old. • It has a good information. • Very useful and very interesting. • Very useful as an informative resource about other NGOs' and donors' activities. • The information corner was very useful. For our association it was the first time being

involved in this kind of all-round information. • Yes. There were important and actual questions. • The information comer was very useful for the local associations and this was a good

expenence. • Very good. • Very useful- got information about organizations and resources I didn't know before. • Very useful - got information about different NGOs working at similar fields of my

organization. • Very much. It responded to the cooperation. • Good information service and could know the activities of other organizations. • Great information to have. Suggest I table English and I table Albanian. • Useful to get proper information about the NGOs, but additional information was need about

the donors in and out of the country with the respective addresses. • Very useful. It could be good if we could have enough time we could display some

videotapes, and photos. • Very useful. We got many materials which we will read carefully. We got many addresses

and contact persons' information. • Good. Few concrete methodical materials. • The information corner was very important to make knovm for all the participants about their

organizations' missions, activities, as well as donors' long-term plans.

3

• Very useful, because we could know organizations and publishing that we know nothing about them.

• Interesting and useful for further information. • Very much, because we had the chance to exchange information. • Good, but many organizations only had literature in English, where as Albanian was

supposed to be the first language. • It was useful, but the announcement should be more clear about the materials and the way

of presentation. • Very useful for the existing reality. The NGOs do not have information about International

NGOs and about each-other. • We got useful information which we will take in consideration in our everyday work. • Excellent. • Very useful. Through it I recognized and got the proper information about which I was very

interested and I do got acquainted with the activities of other organizations. • The information comer was very rich, useful even for the objectives discussed during the

plenary sessions. ORT experience. • It was a very useful information that increases the level of acquaintance \\~th other activities

of the organizations. • The interaction can exist only by informing, and information exchange. The information

comer in the forum contributed in this direction.

4. Did the small working-groups and plenary sessions adequately addresses the overall Forum theme? Why and Why not?

Comments:

• Yes, a stork is made. I do think it is just a start to get to know each-other. I strongly advice to continue it to follow-up sessions.

• Because facilitating was not properly done to orient and focus enough the discussions. • Partly, because more attention should have been paid to the sectorial approach (needs for

sector), more focus to the priorities • So, so. The facilitators tried to make come out the conclusion they expected to, and they did

not considered as much as they should the auditor opinion. .. Yes. • Yes, I think that the interaction topic has been addressed successfully in the small working

groups and in plenary sessions. • The general topic has been addressed properly. The standard way of the problems layout

made possible that the provision of a standard information. • They were useful in generating discussion. • Yes, they did - facilitators oriented very good the participants' discussions, heard the selected

subjects.

• Yes. • Yes, the topic was addressed properly. The rules in the working groups sessions worked

well, and helped the discussion process. • Yes. Although fmding solutions is difficult. • The working group sessions was developed seriously and with high competence by the

4

experts or the respective fields. • Very interesting. The raised problems about the government and the donors could be sent to

them as produced reports. Publish the information in media and in TV. • Completely. • Yes, but there were not enough interest by the big donors in the Environment group. • Very nice job in working groups and in plenary sessions. • Yes. The Interaction Forum's goal is to establish, improve the cooperation and collaboration

between NOGS, donors as well identification of the barriers for realizing this collaboration. Expressing clear ideas will affect positively the strengthening of this collaboration.

• Yes the problems were addressed properly, but donors were missing at the environment group.

• The topics were addressed properly, but there were some long conversations in the working group sessions.

• Everything was O.K. and in the right focus. • The information comer was very useful for the simple fact that everyone could have the

information they were interested in. • We think that the general theme of the forum in the working group and in plenary sessions

were addressed in the right way ... (unreadable hand writing). • I think that the working group transmitted and developed the general theme of the Forum. • Yes, Good facilitators. But so much more work to be done with the NGOs that may be they

are not ready for this type of analytical approach. The reporter for social service group reported a total different conclusion to what was discussed. Total waste of time.

,.. Yes. • The groups were too big address properly the theme and to get the active participation of the

participants. • We got acquainted with the problematic treated in this important forum. • In a brilliant way. We expressed our opinion and gave recommendations freely, and our

opinion had been respected • I participated only in the second day. It has been well-oriented and right conclusions was

given. - I am very pleasant with the work performed by the facilitators, especially from the working groups. Democracy was more interesting. In general, I tried to adopt my experience with the other organizations' experience

• The theme was properly addressed.

5. How was your overall experience at the Forum? __ ~horrible not great adequate

Answers: 4 participants responded adequate 20 participants responded good II participants responded excellent

6. What did you expect to experience at the Forum?

Comments:

___ good ____ ,excellent

• A greater interest, more concrete one, international community involvement • I expected less than I really acquainted.

5

• Experience- collaboration-conversation between International and national NGOs , and donors as well.

• Find the ways for the coordination between the NGOs and donors, between the NGOs and he government.

• We expect more help from in-country donors ans well as from donors out of the country. • Information about local NGOs and international NGOs. • Information about the position, vision and what they do expect by the partnership • Exchange experience with other NGOs. • Information about the donors, International NGOs that operates in Albania and establish

relations with them. • Exchange information and opinions on roles and activities of local and international NGOs

and other relationship between them. • Know more deeply the NGO needs. It could become more clear to the state and donors

representatives. • The comprehension ofthe partnership and how is it accomplished a real partnership. • We expected from this forum that donors express clearly and precisely about the project they

fund.

• Yes. • Everything new and interesting in its topics. • Strengthen relations between Albanian NGOs, the International organizations and donors. • Now we know the NGOs that operate in Albania and their achievements. • More concrete reflexiveness. • I think that established new relations, which will serve in our work. I had the chance to

submit two projects for funding and now I am waiting for their approval. • Get and exchange information. • More representation from the government in order to have their response about the raised

issues. • Follow up the meaning the realization of suggestions. Suggestions should be published. • Knowing donors of different fields which belongs to associations and creation of partnership.

• The chance to get to understand Albanian needs - esp. information. • Knowing the situation of other associations. • Albanian NGOs more committed to real partnership with international NGOs , with good

will to common contribution rather than with a tendency of just receiving funds from these organization.

• Interaction between local and international NGOs. • It was what we missed. • Information, relation and partnership • Increase the cooperation and the partnership not only with Albanian NGOs but either 'vith

the International organizations and institutions. • Make known the activity of our organization at other Albanian NGOs, Donors and

International NGOs. I would like to put some contacts with other organizations in order to begin a partnership in the future.

• Contacts, interaction, precise objective for the future. • Know the donors' programs and their interests. Improve the collaboration \\~th them. • We expected more from the donors.

6

5b

• Debate, contacts, highlighting of the most important trends of the NGO sector development. • A more analytical and structured approach toward the problems that Albanian NGOs and

foreign organizations are facing. • Get to know local NGO and their ideas and activities. • Discussion about the needs and how to solve them in the future.

7. Did the Forum meet your expectations?

Comments:

• We benefited more then we expected, but in the same time we gave our contribution that I personally think that could be appreciated.

• The Forum was a necessity- I hope the forum will not interrupt this initiative and will play its role.

• Useful- I hope the forum will not interrupt this initiative, but it will play its role. • Mostly, yes. • We created free conversations, faith, we got information about donors requirements and put

contacts for cooperation. • Generally, yes. • I had hoped the NGOs would be better able to analysis their situation and come up with

solutions. In fact much of the discussions was superficial. • Yes. As the first step toward a better coexistence between NGOs and donors • Yes, we benefited what we expected. • Yes. Theoretically. • We could benefit the opportunity of communicating. • Good experience. • Benefited a lot, because for the first time has been established direct communication with

donors, which could be represented more in this Forum. • Very much so! • Not completely! • Yes. Facilitators did a good job keeping people on topic. • Yes. It noticed the basis for a better future, we could have some hope. • Generally, yes. • Partly, yes • Partly, the focus was too much on the needs then how to continue or deal with it.

8. If you could chauge one thing, what would that be ? Why?

• It should work as it was stated in the working group sessions. • I think that it should be more space for discussions and clarification according to the

specifics of each organization. More working groups- the theme more specific and less participation to improve the quality of the discussions.

• Better environment for the working group sessions. • Working group sessions be developed in separated rooms, in order to be more quite and not

bothering the other groups.

7

• More physical separation between small working groups - separate rooms would be an idea • We would like to know something more about the further continuation of this forum, because

we consider it as very important. • No, everything done in the proper way. ,.. No, nothing. • The working group methods. Perhaps if a questionnaires was prepared it could make shorter

discussions. • I should ask that donors could be present in all working groups in order to coordinate the

ideas between NGOs and donors. • Should work more for useful publications. • More participation from the districts. • Asked more information from the associations, their advertising at the donors previously. • Invite the press. They reach an evidence of people who NGO services as who could help

NGO. • I don't know. • Electronic media was not represented in the proper number. • More participation from other organizations and institutions. Information of the donors more

concentrated in politics in the future. • I am very happy about everything did happened here. I would prefer that this initiative to be

repeated again in the future periodically. • More professional techniques in delivering information. • Shorter time limits. Two days are a lot. • The facilitators should be more limited in time. More space to the discussions. • Invitation of more opinion shakers or distinguished personalities of the NGO sector; deeper

analysis. • The arrangement for group work (not adequate), the facilitating and the closure of the forum

(more time for a final discussion and reactions in the second day). More specific questions in discussions/more in-depth more NGO representatives in visual way at the wall.

9. What are some Forum's follow-up activities that you would recommend?

• Working meeting should be more frequent in order to exchange some experience. • Information between the national NGOs. • Information between organizations inside the country. • Coordination with organizations and donors. • Training and workshops. • We would wish that this forum to be extended in future seminars where we could give our

contribution and we could get information about issues where we are interested in. • More have to be done to help and support the NGOs especially the NGOs of the aged people,

he most vulnerable contingent of the population. • Distribute forum materials in all the organizations, basically to those which didn't

participated in the forum. • Organization of a follow-up training to reevaluate the situation and to see how is it worked

after the forum, basically the promises and recommendations. • Assistance for realization of the most important recommendations.

8

• I think that in the future special activities of Albanian and International NGOs as well as donors, occur according to the similarities (environment, health, democracy etc.).

• Training sessions for local NGOs on: Donor expectations/requirements for funding; International NGOs expectations/requirements for partnership.

• Separated activities for three levels according to the sector (democracy, social safety net etc.) • Recommendations which were results of the NGO needs, to be presented be considered

seriously by the state institutions and donors as well. Forum can play the role of an intermediator. Activities of different types can be organized in the three levels according to the sectors: democracy, social safety net etc.

• Could have more participation from the donors and International NGOs. We think that the activities that will follow up the forum could be the development of common project between Albanian and International NGO based on the mutual collaboration and understanding.

• Further follow-up of the partnership process. • Conference. Coordination meeting. • Such activities to be developed with a tight focus. So, according to the working groups theme

we can organize some smaller group and more specific among NGOs and donors. • Presentation of the realized projects. The working methods and the results. • A forum like this, with such dimensions, I hope will be organized again after some times.

Initiators are UNDO, ECO and the Local NGOs of Elbasan. • Establish NGO information centers. • Training on project writing and implementation. • After a period 6-10 months be organized another forum that can take in evidence the

improvements and what have been done. Publish as much as possible the USA and Europe donors' addresses, which could support the associations' requests for funding, for their institutional strengthening with experience within and out of the country.

• Group web site for all NGOs. • Organize a meeting about the achievements of the first forum. • Some kind of training for Albanian NGOs on what partnership means and how to realize

that. • Directory ofNGOs and their goals. • Directory of Donors and their goals; • Training on identified needs- more mixer activities. • We wish that everything was discussed to become a reality about the partnership. • Provide the continuation of the activities recommended in small working groups. • Continue the contacts established here. Round tables with International NGOs. • Distribute information for donors which have no presence in Albania. Intermediation to

make possible the inclusion of Albanian NGOs in the international networks. • Need for transparency in the donations, number of funding for different organizations. • Summarizing of needs expressed and addressing to the relevant subjects. • An other workshop, more structured and addressing selected issues from the Interaction

Forum. • Local NGO forum per prefecture/district. Invitation of a focal point, to reach as much as

possible local NGOs/ more real interaction.

9

PLEASE RATE THE FOLLOWING (EXCELLENT, GOOD, FAIR, BAD.) PLEASE COMMENT:

Location, ___ Answers: 20 excellent, 13 good, 3 very good

Forum Hall __ Answers: 17 excellent, 8 very good, 12 good, I adequately

Meals ___ Answers: 13 good, 6 very good, 17 excellent, I adequate

Forum Registration Desk __ Answers: I adequate, 5 good, 4 very good, 24 excellent Could have two or three telephones.

Facilitation in Small Working - Group __ Answers: 10 good, 16 excellent, 6 very good, 2 adequate, I fair-bad

Comments: Good, but very noisy. The facilitators were very prepared, I mean those of environment group, especially Mihallaq. Fair, A1jana and Anila helped us for the problems we needed assistance. It could come better in small rooms.

General comments and suggestions*

• The interaction government-NGO is weak. • It was not made evident this fact. • The state is intermediate for the donations. We do not know instruments and project in order

that the NGOs could benefit with transparency. • I appreciate as a high level activity the Interaction Forum organized by ORT. I suggest that

other similar activities to be developed in the future as a necessity for the NGO integration. My congratulations for the Interaction Forum!

• Association of blood donors feels as a necessity its commitment in different activities. • A place far away from the center could make possible the a better following process of the

training. • The hall could be divided with walls in order to facilitate the working groups process. • First steps done in this interaction forum for the development and strengthening of the

partnership between Albanian and International NGOs, and donors as well, continue in the future with concrete steps.

• The forum hall should be more appropriate for the organization of working group sessions. • It could be more time space for the donors to speak out their alternatives. More International

organizations should be invited in order to exchange experience especially regarding the fund raising.

• We thank you and hope this forum will be followed up from other activities. • This kind of activities should be continued because increases the knowledge level between

NGOs. • I hope this kind of activities will be organized again in the future, and other NGOs will have

the chance to attend them.

JO

• More donors representation. • Come out interesting and useful ideas. • Let give the opportunity to the associations to organize such activities by their own initiative,

not only donors. • Some working groups' members found difficult to converse, they preferred to debate. • Translators did a great job! • We wonld like to be invited in other activities of this kind because we need very much this

expenences. • I am very greatfull to the organizers of this forum who if I could use only one word to

describe "Successful". Thank you! • I hope this is not a separated experience. Congratulations for the wonderful initiative! • The workshop was very useful, in general, but fonus could be different, as for example the

work in groups, where the participants could have more space and not been given defined orientations.

• Translation was very good. The small focus group discussion per sector were too much general and most of the time not focus on the specific sectors, like environment, social services, social economic development and democracy. Also the focus was too much on the problems which they perceived "need ofhopelessness"attitude, but what after that..., future thinking.

'PLEASE REMEMBER THAT WE DO USE THESE EVALUATION FORMS WHEN PLANING THE FORUM'S FOLLOW-UP ACTIVITIES. IF YOU HAVE A SPECIFIC IDEA ABOUT A WORKSHOP OR THEME THAT YOU WOULD LIKE TO SEE ADDRESSED, PLEASE CONTACT THE OFFICE OF ORT DEMOCRACY NETWORK PROGRAM.

II

"ON THE ROAD TO SUCCESS" PUBLICATION

Vol.1 No.1 September 1999

ORTIUSAID Albania Democracy Network Program

"ON THE ROAD TO SUCCESS"

ORT celebrates NGO success stories ....

We\come to the IlIst issue of "On the

Road to Success". The ORT Albanian Democracy Network Program was created in 1995 as a component of The United States Agency for International Development (USAID). The program was designed to strengthen and support the cornmunity of Albanian non­governmental organizations through technical assistance, training and fmancial grants to develop and strengthen the capacity of public policy oriented NGOs in four priority I

sectors: democracy, environment, economy, and social safety net.

As of September 1999, ORT has supported the institutional

I development and public policy oriented-activities of 53 NGOs with 81 grants totaling over USD 900,000 as well as providing formal training and technical assistance to over 700 NGO representatives with workshops in Policy Advocacy; Financial Management; Legislative Drafting Techniques; Project Implementation; and Independent Research in Support of Democratic Development.

The fIrst issue of "On The Road to Success", highlights some of the ORT NGO success stories to date.

TECHNICAL ASSISTANCE:

D~ ... pmWIi' ... ;m

~~

Constitution:

ORT DemNet has played a very important role in engaging the NGOs and public in drafting an approval process of a new constitution. ORT DemNet organized and funded 4 NGO Forums with 50 NGOs at each event, public hearings and 7 regional round tables with the Parliamentary drafting commission. As a result of the input by NGO's and the public, 25% of the provisions of the draft constitution were changed based on their recommendations.

Technical Assistance in the Drafting and Review of the NGOLaw:

ORT and the International Center for Not-For ProfIt Law have played an active supportive role in the development of a new NGO legislation in Albania. The DemNet Program signifIcantly contributed to the efforts of forming an NGO-govemment working group, 2 public hearings, NGO sector strategy meetings and publications on the legislative initiatives in the NGO law. The fmal NGO draft law is with the Council of Ministers. Their decision is required for the draft to be discussed by Albanian Parliament. According to the ICNL consultants, the fmal draft law is considered to be one of the most precise in the Balkans and addresses both Albanian and International NGOs. ORT is currently following up with a

lobbying strategy in anticipation of changes that will be made by the Council ofMinisters. Organizations or persons interested in receiving a copy of the draft law are asked to contact ORT in Tirana at (355-42) 47601.

GRANTS:

Ombudsman Institute from the Institute of Contemporary Study:

The overall institutional efforts for the protection of human and individual

i rights in Albania comprises of the ISB Project, an Ombudsman in Albania. The democratic development in Albania requires an Ombudsman institution set up as an independent institution for the protection of human rights from acts or non-acts of the public adurinistration. The need for such an institution arises due to the low level of services rendered by the public adurinistration, abuse of power and the low level of social awareness regarding human rights.

Mediation Law from the Foundation for Reconciliation of Disputes:

The Foundation for Reconciliation of Disputes published its training material in a book called "A Training Manual for Mediators". The manual answers the requests of mediators trained

·2 ORT/USAID :Albania Democracy Network Program

through the ORT DemNet funded subproject for a methodical guide for mediators as they work to address conflicts at the community level. The manual examines the draft Law on Mediation, which already has been approved by the Parliament. Other intemational organizations have been involved in the drafting process including the Council of Europe. The manual will serve as a resource to guide mediators in the field as they attempt to promote conflict resolution and reduce violence in the life of Albanian communities.

Center of Testimonies on Crime and Genocide Against the Kosovar Albanians:

The ORT funded "Center for the Collection of Evidence on Crimes and Genocide Against Albanians in Kosovo" was established on the initiative of eight different Albanian NGOs thatORThad previously worked with:

• Albanian Helsinki Committee

Albanian Group of Human Rights

The Women's Center

Association of Professional and Business Women

Legal Women's Group

Delta X Youth Center

Albanian Youth Council

Conunittee Against Violence and Torture

The Center, which was fonned with the facilitation of ORT. focused on the collection of evidence of war crimes against Kosovar refugees. More specifically. the objectives of the Center were to:

increase public awareness of the atrocities assist the International Crime Tribunal

• identify human rights violations obtain and document testimonies

In total, 20 activists from the eight NGOs were involved. Their activities began with a training workshop conducted with representatives of the Hague Tribunal. Eleven trips were conducted to meet directly with Kosovar refugees located around Albania. The 20 activists were divided into five groups, with one person appointed coordinator. Nine reports containing approxementaly 200 testimonies were collected. The interviews were processed, typewritten, translated and posted on the

I INTERNET. Copies were distributed to local and international Human Rights organizations, Albanian and international NGOs and donor organizations. When the Center completed the ORT Grant, the members of the coalition formed a new NGO, "Peace Though Law Center".

PUBLICATIONS:

Albania's Road To Democracv:

ORT recently published the Albanian language version of the book "Albania '5 Road to Democracy". The publication is based off of the results of a national survey conducted in the fall of 1997. Respondents to the survey were selected to equally represent every region in Albania. Over 1500 Albanians responded to the more then 800 question covering demographics, political, economic, and social life in Albania from 1991-1997. 400 copies were printed in English and 250 in Albanian. Copies of the book are to be distributed in both languages to Albanian NGOs, International NGOs and foreigu donors at the "NGO Interaction Forum" in Tirana on September 16-17, 1999.

NGO Management Handbook:

September 1999

As a follow up to its "Financial Management" training, ORT compiled information from a variety of sources to produce the "NGO Management Handbook", a 90+ page book which not only gives information regarding budgeting, modern accounting systems and huntan resource management, but also gives some record keeping and reporting sample formats. The handbook is based on international NGO standards and is desigued for use by NGO finance officers and executive directors. ORT will update the handbook on an on-going basis to keep abreast of new management techniques. ORT will distribute this handbook in both English and Albanian at the "NGO Interaction Forum" in Tirana on September 16-17, 1999.

We hope you have enjoyed our first issue of "On the Road to Success". We welcome your comments and suggestions for future issues.

--_ ..• : : : •.. _--

NEWSPAPER ARTICLES ON INTERACTION FORUM

PRESSRElEASE ORT A1bani. Democncy Notworic Prol"m • Rroga ", .. fa ",,,hili #16 • Ti""" Alban;' • (lSS-41) 41601 • fax: (lSS-4l) 41602

For Immediate Release

Date: Contact: Phone: Fax:

September 13, 1999 Juliana Hoxha, Country Director (355-42) 47601 (355-42) 47602

Interaction Forum

Tirana, Albania-oRT Albania Democracy Network Program, a project funded by The U.S. Agency for International Development (USAID), in conjunction with UNHCR and OSCE, will sponsor the "Interaction Forum" on September 16 & 17, 1999 at Tirana International Hotel.

The ORT Albania Democracy Network Program, funded by USAID since 1995, is designed to strengthen and support the community of Albanian Non-Governmental Organizations (NGO) through grants, training and technical assistance. The "Interaction ForumlT is part of ORT's technical assistance program aimed at strengthening the institutional capacity of the Albanian civil society sector.

The goal of the forum will be to facilitate greater interaction between international and Albanian NGO's. More specifically, identify the needs of the Alba~ian NGO's by sector; and initiate working relationships between A~.banian and international NGO's by identifying concrete forms of cooperation.

The idea of the Forum was conceived during· the refugee crisis. Many International NGO's arrived in Albania and struggled to find local NGO's to partner in their services.

Forum participants will include more then 80 Albanian NGO's, 30 international organizations, 20 national and international donors operating in Albania and representatives of the local government.

USAID

Newsletter "Gazeta Shqiptare" 11.9.1999

Seminar: How to work with the NGOs

ORT Albania Democracy Network Program, a project funded by The U.S. Agency for International Development(USAID), in conjunction with UNHCR and OSCE, will sponsor the "Interaction Forum" on September 16 & 17, 1999 at Tirana International Hotel.

The goal of the forum will be to facilitate greater interaction between international and Albanian NGO's. More specifically, identify the needs of the Albanian NGO's by sector; and initiate working relationships between Albanian and international NGO's by identifying concrete forms of cooperation.

The idea of the Forum was conceived during the refugee crisis. Many International NGO's arrived in Albania and struggled to find local NGO's to partner in their services.

Forum participants will include more then 90 Albanian NGO's, 40 international organizations, 20 donors operating in Albania.

" ..... . ' . . ~h~~:iij~h~,~'~~t;~j~lt~&n~:l' : .. " '.:, , ;. jet marreveshjeve Ie reja. Sipas Meksit, .... nga zhvilli­met e deritanishrne po; duket se ne financimin e: projekteve ne kuad~in 'e: Paklil IC Siabililelil, rol Ie rcndesishem po luajne Bashkimi Europian dhe Bani<a Boterore nepermjel zyres se perbashkct qe esh­Ie hapur oe Bruksel:l , Megji Ihate thekson Mekst "kjo nuk e pcrjasht'on Ii­nancimin nga inslitucione~ c Ijera I1d~rkombctare li­nanciarc si dhe donalorct c Ijere". Per Ie realizuar nje zhvillim Ie shpejte t:!konomik, Qevcria sh­qiplarc ka identifikuar kater lusha krycsore per nClerhyrje. Nderhyrja do Ii! konsistoje nf zhvillimin in,:, .,Iilucional dhc teadminis­(raleS publike, programet e "ektorit social, zhvillimin e ,~klorit privat si dhe in-. rastrukturen publike.

Per keto ministrj'\ Mek-i evidel~toi financimet e era deri Iilni. Ne dy vilet fundil, viera e finand­H~ve Ie huaja Ie flltun n~ rken e shlctit shqiplar Jne qene rrclh 182 mil-. >"cdollare, nde"rsa velcm Ililncimet e brcndshme Ie \ >,lIlifikuara per kcie vit rijn~ ne rrelh 132.8 mil­ne dollare (osc 18.6 mil­de lekc me kursin 1 :140). ~ qcllimin qo Ii! shpejlo·

Siti

·Dogana~,!

AJ>gjeli mbledh diSa lisa . perfaqiisuesit diplomaliki! Ie akredituar ne Dranl!. Am­basadorel e Bldlgaris<j. Gre· qls!!, JWise, Kiniis, Maqedo­ni, Ru~se, 1UrqisC dhe si gjithmone sheS i ~!pnil te FMN-si! no Shqiperilteich· el dhe perlaqiisuesja e Mis· . ionil I~ CA!-A·Albanla·s u . lakuan me minislrinAngjeU per problemin e bash~ kepunimil dogano" Thkimi, kumermin pjeseedhe Drej. lorel e Pi!rgji~hi!m Ii! Thd· meve dhe Doganave kishte per qellim arriijen e mar-­reveshjes per. bashkepun· imjn me Ie ngushte midis adminislra liis doganore dhe tatimore U! vendeve lona, Ill!

Ii! zbatlmlt Ii! ma ...

t1ye Hhe t~ tatimeve.

. klm· Angleli deklarol se . Ylii> Ill! ruqi e Kodill~ ru J~!nor mi! 15 maj Ie ketij viti perkoi me zhviUimel e luflCsneKosove,porperv~ ani\jevc u cvidc.nluan dhe

problemq Ii! alave po u

. ..

.¥:~:r~:~::~:~~li NJOFTIM PER TENDER -----,--61 . Mlnlstrla ~ Bas~k~punlmlt Ekonnml~.~h~.""-~-·~'"" "'0 ...... leile~<';:' .

it-:::> ...•. ;;, if r.)1·$i+A 1}-- .. !;'·~IJ:~ ~:.T:A-:::?!7;~::··')·,if;/.I?\tlt·: . ... :.,): .. " .. c .•. · .. '. ' .. ;~., .. ...... ·:~J.lal qtD .! ' . . ..• .. . .. ''' ... , ... t ...• , ..... .... ,.·\· .. ·"·<.,,..··.,.·,>.;If14 oJ.' ·7.'

I~~',i, .. I":· . '"ii:rD~;;i;\)~; ...• 'f~:~::"" :.>: .. ' , .' .. ~. ",;,.;~ : ... i;,., .. ,"'o~::::\li>.::~:¥'i;:', ·Se ·)'r1 SI,·/·j·,:,·;·· >. . :' ' .. ft:, .:. ..<.: .,.." \~.~!. ': ...... .. .' .~, •. ,~), .• ,. ,., "lJ,···' ."- . ' .. ·te" p. '.O.llm. ·e"~'7f':"""··· . . . ~ I .. , , .. '. ,.

'i me OJQ )1;!: .. : . .: ... , .... ., .. :.';:' .. : .: ! .': ~ ":'

.. .. .

.. U! arsyeshme •. Insloneve til ridiyshme. . . I.' ' .""i.L. .. .. ; "inA obi) 0kiId Zingu b) fijetesutc)""kt.lskafe, I lml1(lhtl.eJ!"" . •••• ;.l.~£!_·.~t~;t:; . .. , .:,_"" ...... ,. __ ,.J ..

Newspaper MAlbania~ 17/9/1999

MAJKO IGNORES THE NGO-s

The Albanian NGOs has done yesterday their first step toward the collaboration between themselves, other International NGOs currently operating in Albania and different donors. Gathered in a Forum defined as the Interaction Forum they have done their first effort toward the coordination of their actions. In this forum, which will be over today, participate more then 95 Albanian NGOs, 35 International NGOs and around 20 donors, established and operating in Albania Although, a limited number of Albanian NGOs participate in the Forum, Juliana Hoxha the Director of ORT !Democracy Network Program accepts that it has been followed a selection process for the NGOs that could participate in the Forum, whose number is roughly 400. This selection, has been done not only referring to the NGO address book, but to their activity level as well. According to Valentina Leskaj, Executive Director of the Family Planning Association, it is necessary to take in consideration the in-country capacities, making in this wayan appeal for attention by donors side as well as their inclusion in the NGOs' activities. Beside that, the Albanian NGOs are asking for their involvement in the government programs. But in the yesterday meeting have been missing some of the Government representatives invited to participate in the Forum. The Prime Minister Pandeli Majko has not been seen in the Forum hall. He should give a greeting speech for the Forum participants. According to the organizers of this activity until a day before they had a positive response, at least for the participation of one of the cabinet consultants, but neither the Prime Minister, nor the consultant has been present. There was missing the Mayor of Tirana, Albert Brojka, because of his visit in USA as part of a delegation from the Albanian opposition. The Minister ofLabor and Social Affairs Kadri Rrapi did participated in the Forum. However in the Forum participated many donors, as well, which can provide financial resources for the Albanian NGOs. Among them show up USAlD, World Bank, OSCE, UNHCR, VNDP, Soros Foundation and Council of Europe.

6f

, ;

-HapetForumi i-Organizatave Joqeveritare me aoriaforeH -ehu6j.

;~:t~~~~~EEt~,~M ... cll·k. '. shp;-e. rfilrOJQ~te ~i;1!~~1.E;:~i · midis tyre, OJQ-ve te· ~'. kryebashkiaku i Tuanes;."

tjera nderkombetare- qe _ Albert 8rojka. per ~ . · veprojne niLS~qi~,. si--; .. ~seli dhe veprim· edhe nga aktiViteucthe ·pet~!lirje·dhe perspektive vizites se tij ne·SHBA~ .

. -.: edh~ d~~!-~«:~~~,qiperi. Megjith. _. veprimtaria~e _:tyre:,~ ne ·-frogramet qeveritare. 'perberje te nje deIega.:a= ~ . ndryshem .. : . ..--': ~=- .. "' ate, ni. fOrum. merr pjesi Oje oJQ-ur shqiptare Por ne: takimin e dites periaqesues ti opozites ;

TEl: mbledhura t)i t\ji _ . nje' .numir-rea-kivishr - --- - 'kane- bire -identifikimin e se djeshme. kane mun- 'shqiptare. ndersa ka qene forum ti cilesuar si shume i vogel prej OJQ-ve nevojave ti tyre. Sipas guar nJe pjese e qeveA- _ i pranishem ministrLi . Forum. Ndirveprimi, shqiptare. Juliana Hoxha Valentina Leskaj, drejtore tarive tEl: fmar. Nuk eshte" -punt!s ~drr Rrapi: ato kane here per- drejtuesja e programit ekzekutive e Shoqates se pare ne salle kreu i Gjithsesi, ne kete pjekjen e pare per te "RrjetU Oemokracise", Planifikimj.t Faf!liljar, __ , ___ ._.qeverise-Pandeli-!!ajke;-i ·~rum.kane..marre pjese bashkerenduar punen financuar nga USAIO-i e eshte e nevojshme qe te cili duhej te..jepte nje . . .nje numer jo.i vogel. . l

dhe zonat e _tyre te pranon se-eshte bere nje merren ne konsiderate mesazh pershendetjeje per donatoresh, te cilit kane i influences. Ne foruritin - pirzgjed.hje·nder shoqatat· kapacitetet vendase, duke forumm. Sipas drejtuesve . mundesi financimi te 1 qe do te mbyllet sot, ekzistuese ne Shqipiri, te bere ne kete menyre nje te aktivitetit deri.nje dite~ medha per OJQ-te sh-mendohet se martin cilat.mendohet te kene thirrje per vemendje dhe me pare;-ka pasur ~je ".- -- qiptare.. Midis tyre pjese, te pakte~ 9S kaluar numnn 400. Kjo perfshrije ne aktivtitete pergjigje pozitiv~~ ~ spikasin USAID, Banka ~ organizata joqeveri~are perzgjedhje, sipas .sai. me OJQ-te dhe donatoret pakten per te derguar ...!...._ Bot~re. OSB£. _UNH~; ~shqipt~, 35 OJO' eshte ~re, i<?,~~~ nga__ e huilj. l'Or perv~ 1si$ah---~-- :qofte .. e41!~ nj~ prej ~::.. ::_~PNtfu, sOros;Kesb.illrT~ . · nderkombetare dhe adresaret;lCu figUrOjne .te duket se OJQ-ti shqiptare keshilltareve te lij, por ¥ Europes, etj. reeth 20 donatore te regjistruara OJQ-te;-·por ·l(erkojne qe ~e kene krye~" ~e as-;; '<-:"""7;:- -- ~'

.utomejtesh speciale per evadim plehrash.

urbanistik pjesor ne zonen e re te qytetit.

:500.000 (peseqindmijil)leke. _ - .:. ---­d te terhiqen c;:do dite prane zyres se seIcretar­;es se pakthyeshme te percaktuara ne doku-e. , te tendera ve jane:

~ automjetesh: 24 Shtator ora 13.:00, sallla e

.... _.--_ .. ,- .

im pjesor: 24 Shtator ora 10:00 , salla e

; metejshem mund Ie kontaktoni me numer

Bashkia e Qytetil Kavaje

<

Kerkon te realizoje blerjen e karrigeve, tav­

olinave, derrasave te_ zeza (xhami) per_audi-. . '- .. -'- -'.- -

toret e fakultetit 'me fondin limit 3.500.000

leke te vene ne-d!~poz!cion

__ . ___ . - --nga·buxheti i-·shtetit ..

.- -Ftohen;firmat-e interesuara, t~ paraqiten

perpara-d~t~s 2T.Oc}~f~99, dite'ne ;e~i1en do te zhvillohet tenderi me procedure

-prokurimi "'Tenderi i Kufizuar n per terheqjen ----:.~-,----- -.--~---- - --

e dokumentaci~~t perkates.

1 0

Newspaper "/ntervista"

26.9.1999

ORT and Democracy in Albania

Juliana Hoxha is the Director of ORT Democracy Network Program in Albania

Blerina Cizmja- Something about yourself. What is your profession and how long have you been working as the director ofthis program?

Juliana Hoxha: I am graduated in Tirana University, Faculty of History and Philology, but I never exercised my profession. I have always worked in civil sector and for four years with ORT DemNet. The program previously was run by an American Director. I was appointed as the director of this program a couple of months ago.

What is ORT, the sectors that it sustains and the financial resources?

- ORT! Democracy Network Program has been established since 1995 in Albania. It is designed with the intention to support the development of the Albanian NGOs, strengthen their capacity in four priority sectors; Democracy, Environment, Social Safety and Economic Growth. ORT offers technical assistance, training and fmancial support for the NGOs activities that are public policy oriented, such as law recommendations, relations with media and business sector etc. ORT Program is financed by USAID.

- When and why came out the idea to held this forum?

- The idea came out during the Kosovo crisis, when in Albania were established more than 150 International organizations. In this conditions the need for partnership with Albanian NGOs was evident, but there were missing methods to realize it. Now that many from these organizations had planned to stay in Albania it is the time to find the ways to partner.

- So, do you think that this forum is a necessity?

- Yes. It is a necessity to make the partnership as much as possible successful. We are bringing together the NGOs and the donor organizations to create a clear idea about the problems and the areas of collaboration.

- Your job concludes with the role of intermediate?

- No. During the crisis ORT has played an active role in the partnership. In the future we will work in this sector through grants, training and technical assistance.

11

- Who will you proceed in your work to identify the needs of Albanian NGOs, referring to their growing number?

- We plan to distribute the infonnation provided by the forum within 10 days as a produced report either for those NGOs that didn't participated in the Forum. So, in this way the Forum would become a weapon for the NGOs and this could be a good occasion for them.

- Finally, what are your plans for the future?

- The agreement between ORT and USAID tenninates on June 2000. We have planned to collaborate for other two years with the same focus.

me pe/qen qe Halle .. · '. . ~~~~~~~!9:01:4 /dhin Ii getit"· "Falimentoi" , .. . .. :j; ~~!£~l~~~t:J dheuzinae .·.la~it 'mlari jni. GjitlJisuj kjo islue nje dttyrt e .' . y urob- kril!te.slttrare Itmerrel me uijim- "Disa qeveritare jane te interesuar te shiten rui I 'i lartne e lyre. Por nut do Iii mil . Sh' . . apilr-pe!qente qe It kisiue njl ndarje Ii tillil. . ne qlpen plehrat e vendeve te fjere" 1uaj- NillISnjil viirui lebolils ani nut co~ Resbit Bora: • loti Pjet!r ju - CiJ. i!stilhv~ata 0 k&aj i OS< tobel ni pjeslli formuara nga qlnie joai puaoaJi!s i vjoll!r i1odoslrisl! uzioo! t WI. Ii seW11i hmdlrt. dhe pfr disa vJet .hefiJoduslrisf . - ShkatOrrimi i

~fp- ';"Puj,f~&·~!'t ~~~~~~;i,.~~~~;;~~;;,~~~f;=::-: 1M i1izimi njerezor arrihel allhere tur bukes. te kimise dhe shpn:seo • amortizuar. por eshte.lcrapi •• use arrihel civili:imi i gt'IIOJ. ql sjell civ- apia e shokut pfrta lfobue gjend- funditll!bujql!sise, Ndersakyven- shokute:zbatuarn!Shqiperi p(rte e e ili:imin e familjes e II shoqlrisl. MJ/Il jen ne nivelin zero dbe per te finur dim e fshiu kete uzioe nga karta e ~ gjendjen n! ~iveJin 1"10. Jane ihe nut do Ii me pe!qente qe pro6/emet e ne efi,""ce Cekun e bardhf. Au- industrise. Pse? Sepse disa nga qe- ioteresat. disa qeveriwev., te fIII-mia·11 m'i :gjidhnin Ii /jeril. Do Ii tori!tec;ekuttebardhe,mbssinder- veritaretjanete intmsuarteshiten Iidbura me kapitalet e b'uaja qe 0

ull ishlenje meiatle prisja ruiihmen e tuan vila! me leket e populli!, tani ne Shqiperi plehrat e botes Dhe u 'jeteruan" industrine tone NdIy-.11 "astujl". Njl shtel i cili nut murui It bejnekonferenca shtypi e bredhin ha)ien dyert atyre sbe si do tembusheshin dyqanct me ~.. v/erisoje dhe II mbrojl Ii drejlal e neper bote... - tsblHolur se iodD.tria joo! mallra te huaj.? . ; e g/'UOS ,'ka se si Ii quhel shltl. Nut 1-------------------------------II dolihahi~q.nihapsiratelira 'ORT db ·d·· ·kr · i". ilrtalilttillisottm,gnmjaIHbtoje. . e emo aCla'

ha Ii jeli nji qinie e ploli njeriizore. Ne Ii fond Ii dilb secila e dinon vetveltn . . .

ie- me mendimin: Pine nut arrita atje 'ne S bqipe ri :;~~?:::a~=7::' .. .' . _ .. ,. . ;e- gnmja. Nj' pjest e grave ni dim e JIlIWu HoxIt .. eslrtt dnjIDmllt progtlJllil tl - planifikuai t!-ciendrojof n~ Shqipfri eSh!! kobs'~ t'u qi/ solme perpiqen t'i faiojni ambicel ORT- sl, Rrjdi IlJtmoUuisl ne Sqiplti. . .. evidenlui kllo fonna. . -'e. dhe perpjekjel e lyre ionbtuese BleriDa Cizmja-~ per ju. Proresioai dbe prej 51 •. ; ; Pra, ja .... do.i· .. "bajlja • Utij f ... .i qe Ij! ,Ii 'prapa mashtullil"dute filuar.ni kobi!sbjeaidrtjtoreshhkftij prognmi! . ,: ""iJono.oi'.""m&;! . . ifi minyrt indiretle nipirmjel ditujl JaDana HOlba: _ Kam iubaruar Uni- . '. , : Po. Nj~ domosdoshm~ri per .13 ar /jeltr. Kjo du Ie Wrli fatkeqisi per versitetin of degen histori, par nuk 0 kam bere partnoriletin sa me .fohiv. n ok bOltn e 8"""- Ni l:ohin e sotme ojo ushtruar profesionin tim. Kam punuar ne .' sillnim basht! ketu OJQ dhe agjensi!! .. dute perjeluor "slalwin e injorimil ,ektorin civil. rreth ka!!rvjet per pro- . . OOn8torepertHrijuarnjhlcmtt!qart! I. ngo shoq'rio mirtnjohise ~ shptr- gramin ORT i cili I!O vjet ka patUr drej- . per probiemet dhe fushat 0 ~ '" blhel si nje qtnie :buturimi. Jo po tor te sajin nje ·amerikan. Drejtmshe 0 it . ... q.llim roli shoqiror e ka :brilur ali tij jam qe prej nj! viii ~ hn jnj IItIT fud .. nm 0

ta n. shkallen ~ nj. sendi. Dute IIOS _ C' i!sbt! ORl', .. klarel q! ajo ldfnIjeli!sit! Ie pasurfuqidheperkrohje Iigjoti!.graIt mhi!sbteldil.bazao .. j liunciare! . ~ 10. fdhe gjak krizfs, ORr b Iu-Ie endt i q'ndJVjni hesnite rolilli /}fe, _ ORT, Prognwi i Demoktacise ne , ajtui oj! roI aktivper panoerizim. Ne t! " sep .. ngurrojni Ie Marrin ni dore . " drejlimin e jeles •• veL £Shll toha Shqiperi. u krijua ne vitin I99S per t! . ardhmen no do !! ~ of kfI! sek· Ii kui veli gruaja nut dlIIrel Ii mbeltl mbeshlclur OJQ- no sbqiptare dhe punfn .. tor nfpftmjol iranlev., trtjnimit dbo

e tyre ne kater ,ektor! "-osore: . "asistenci!s teknike. . . ·v ni mishirtn e Ii Ijerive. Pm Ii mas e ~1 It le101t veten it bierl vikWni. Sinrholi Demokraci. mjodis, okonomi dhe -Sidolf!r8rdlgajlplrcaklillii

iJi~sstfimdi~'perlipasurnjihosJt. milfqenie social., si dhe vqrrimtarine., drejlf·ipoobdh ..... ojavelfOJQ-Ye !t tishort dhe nji familje dlIIrel ta sit- organizatave'lf punojne ne firshfn e polio , duke mam pansyshlllllrillollldlr If

tyji grruvr Ii plrballel me nj. prlim tikave publike me sugjerime per hartimi Iyr.! . I- me.1i Iorti. RDlipasiv sol ni, femrin Iigjesh, iekomandime per Iigje.ekzis-. . - Kemi of plan 'If inftrnraciooin 0

Y- lues., marrfdlrfniet me med'" sektorin e bimesil·etj· .: . kri,·uarketutasb ....... ·' ... !! .... ·'uarlxardadh;"Odill ... 'r bille duke u themnuar nga veli gru- -. ............... ....., ,.... .. V. Ii tu . e '- Prograrnet e saj financohen nga USAI!)' i. ne fomren e nje rapcrti edhe per OJQ 'If s'marrinpjese

• aJa. e m r OJo I mos pranoJe. -Kurdb .... UudiideJ· .. mbaJ'IJ'es.UltiJ· forumi! ~ Forum. NeW men""' Fonrmi do t' "'. n'" _~ ..... ruieslrJrimin brtndo vetes, aliiberi ojo..... .'" ' '". ,- ,.. ~~ .... do Ii jell e afte per ie prekur - Idoja Iindi gjale penudhe, ~ krizes kosovare. kur t! gjith! dbe ky !sir!! rasti i part i madh per sbcqatat. qylelirimin. Tl shpresosh per Ie ndry-ne me psk se dy muaj kllo u grumbulluan rreth ISO otga- -Sf fundi, pl .. et perl! ardhmea! shuor eshli njt ndjenji e ruiershme nizata ndfrl<ombetare. Ne keto kushte lindi nevoja 0 part- • Marreveshja 0 0 ORT- ~ me USAI!)' in pl!rfurrdoo dhe njii inlerprelim dinjilo:. norilelil me ato shqiptare, por mungonin formal per to ne QeJ>hor!! viti! 2000. Kerni ne Plan qe dbe per dy vjcI

bfre ket!o Tani qf shume prej ketyre organizatavo kane t! tjore te lrasbkeveprojm~ ne t! nj/jtin fokus.

1"? •

· •... .' :

120 1 Qendra e Grua~

'-----!;--.===='=================~ Lista e granteve te ORT

t Gmpl SbqlpW per Ie Dreltat e N)erlDl: MQeDdra 8 DesbmlVe per IrIIIIet db8 &e1lCldll1lllaJ Sbqlptareve te Kosoves" [Gram 5.000 USDl DIta e nmmlt: 19 prill '99; DIta e mbarImIt: 4 qersbar '99

Qendra e Deshmive per Krimet dhe Genocidin ndaj Shqiptareve te Kosoves eshte koalicion i 9 OJQ-ve: Grupi Shqiptar per Te Drejtat e Njeriut. Komiteti Shqipter i Helsinkit, Grate Profesioniste dhe Biznesmene, Grupi Ligjor i Grave, Keshilli Rinor Shqiptar. Levizja Paneuropiane Shqiptare, Qendra Rinore "Delfi XS", Komiteti Shqiptar kunder Dhunes dhe Intolerances ne Shoqeri.

Ky projekt (subagreement) do te financoje 10 vizita te vullnetarelle te Qendres ne karnpet e refugjateve kosovare per te mbIedhur deshmi mbi krimet dhe genocidin ndaj shqipterve te Kosoves per gjyqin e Hages. Vizitat do te behen ne kampet e Kukesit, Lezhes. Tiranes, Durresit, Kavajes, EIbasanit. Qendra do te pergatise raporte 6 javore te cilat do te hidhen ne Internet si dhe do tu shperndahen institucioneve te ndrysbme qeveritare dhe joqeveritare brenda dhe jashte vendit.

2. Fondacianl Sbqiptar I PaJtlmHte MosmarrevesbJeve: "Zhatlmll DgjHIe II Ie MedJaIIaR Sl oJe Alternative per 19jjdbjen e Kanftlkteve" [Gram 5.000 USDJ DIta e mDmit: 5 qersbar'99; Olta e

mbarlmlt: 30 sbtatar '99

Fondacioni do ta perdore grantin perle organizuar 4 workshop-erajonale me gjyqtare, prokurore lokale dhe mediatore te Fondacionit mbi ligjin e ri te porsaaprovuar mbi Pajtimin e Mosmarreveshjeve. Qellimi eshte qe tu prezantohet institucioneve qeveritare OJQ-ve dhe publikut shqiptar ligji i ri si dhe te diskutohen e praktikohen me ta teknika nderrnjetesimi (mediacioni).

Gjithashtu Fondacioni do te kryeje nje studim per te vleresuar zbatimin aktual te ketyre teknikave nga istitucionet qeveritare dhe OJQ-te.

3.lnstituti Shqiptar i Sbldimeve Bashkekahare: "Ugjll Transparences per ProkDrimet PIlbDke" lOrant 4.960 DSDJ DIta e filllmit: 10 qershar '99; Oita e mbarlmit: 10 tetar '99

Nje studim i koheve te fundit i Bankes Boterore nenvizoi se proceset e prokurimeve publike te qeverise shqiptare jane ineficiente dhe te korruptuara. Qeveria vete i pranon keto perfundime dhe e konsideron prioritet permiresimine prokurimeve pUblike.

Ne pergjithesi propozohen dy strategji per perrniresimir. e prokurimeve publike. E para e Ie sistemin ashtu sic eshte pa ndOJ~e ndryshim te rendesishem. E dyta eshte per ta centralizuar sistemin dhe per teo ushtruar nje kontroll me te madh mbi keto procese. !'Ie driten e ketyre dy strategjive te propozuara, Instituti propozon nje te trete.

Si faze e pare, Instituti me kete grant do te beje nje rishikim te pavarur te sistemit ekzistues qe do te udheheqe pastaj nje diskutim ku do te perfshihen jo vetem agjensite qeveritare por edhe ato private tregetare e shoqerine civile. Instituti do te punoje me agjensite qeveritare, ato private tregetare e shoqerine civile per te forrnuluar disa rekomandime e per krijuar konsensus mbi ndryshimet qe do te behen ne sistemin ekzistues. Se fundi Instituti do te asistoje ne zbatimin e sitemit te ri te

Shenim Ti! gjitha projektet e financuara nga Qendra e Gruas jane kOlltribute lIe baza

vullnetare dhe e pjesmarrjes si! aktivisteve ti! Qmdri!s. Mediat mlllid ta slifrytezojne . Buletinin pi!r nevojat e lyre, me kusht qi! Ie citojne burimin.

BulBar DeD klIidesia e Iris 11111511 ItISlfeIll: IIIdet SIll Eglaatlaa IIEBMlll.IIIIIIIIIClSlllllIIIIID .. __

NGO "MANAGEMENT HANDBOOK EVALUATION FORM

ORT Albania Democracy Network Program Rruga Mustafa Matobiti #16, TIrana, Albania Tel: (355 42) 47601 TellFn: (355 42) 47605

QUESTIONNAIRE REGARDING THE PUBLICATION "NGO MANAGEMENT - A MANUAL FOR ALBANIA"

"NGO Management - A Manual for Albania", was produced by the ORTIUSAlD Albania Democracy Network Program to assist Albanian NGO Managers and Finance Officers in the planning and decision making process. Created to provide up to date information for Albanian NGOs, ORT plans to update the manual from time to time to reflect the most recent changes in the Albanian civil sector and legal framework. After reviewing this manual, ORT appreciates your time in completing this questionnaire and your comments and suggestions.

1. Has your association used this manual?

2. If yes, specifY in which cases?

3. Please state the position of the person in your organization that has used the manual?

ORT International Project Director, Celeste Scheib Angus 1900 L Street, NW, Suite 603, Washington, DC 20036 (202) 293-2560 Fax: (202) 293-2577, E-mail: ortdc@aoteom

4. Which chapter, or area of this manual, has been most useful and why?

5. Which chapter, or area of this manual, has been least useful and why?

6. What changes Icorrections do you recommend to improve the manual?

7. What additional information do you recommend be included in the manual?

THANK YOU!

NOTE: Please send completed questionnaires to:

ORTIUSAID Albania Democracy Network Program Rr. Mustafa Matohiti, nr.16, Tirana, Albania TellFax: (355-42) 47601102.

2

CUMULATIVE LIST OF GRANTS

~

TOTAL GRANTS: 81

ORT Albania Democracy Network Program Cumulative List of Grants a/o September 30, 1999

TOTAL AMOUNT AWARDED: $904,090

CROSS-SECTOR INSTITUTIONAL CAPACITY BUILDING IGrant Total Amount: $290,000 PrQiect Duration Dates: Start Eni!. 08/01198 06/01100 CRSNWK-OOI

SECTOR AREA RESOURCE CENTERS

PrQ;ect Duration Daws: Start Eni!. 09101199 04/30100

09/01199 04/30/00

09/01199 04/30/00

09/01199 04/30100

ORT Albania Oomocracy Hotwol'M Progr.m Cumulativo Lilt of Grant. oJo February 1,1999

SARC-OOI

SARC-002

SARC-003

SARC-004

Albanian National Training and Technical Assistance Recourse Center: "NGO Development and Sustainability Strategy" (DAG-$290,000)

4 Grants Total Amount: $60,000

Foundation "Regional Agency for Development" I Elbasan: "NGO Development and Sustainability Strategy" (IOG-$15,000)

Albanian Disability Rights Foundation: "NGO Development and Sustainability Strategy" (IOG-$IS,OOO)

Foundation "Regional Agency for Development" I Tirana: "NGO Development and Sustainability Strategy" (IOG-$15,000)

Dairy Entrepreneurs National Association: "NGO Development and Sustainability Strategy" (IOG-$15,000)

MG • Mlcrogrant lOG. Institutional Development Grant DAG 1:1 Development Activities Grant

Yt1

DEMOCRACY SECTOR PrQJect Duration Dates: Start End 12/22/95 1130/96

2/1196 5/31196

1/1/96 3/31/96

111/96 6/30/96

7/1/96 12/31/97

9/1/96 11115/96

9/1/96 11115/96

2/1197 10/30/97

1/1/97 4/30/98

7/1/97 12/31/97

5/22/97 6/29/97

6/1/97 10/30/97

6/10/97 7/15/97

6/17/97 7/15/97

ORT Albinia Democracy Notwork Program Cumulative Ust 01 Gfont' 010 February 1,1999

3S Grants Total Amount $236,242

DEM-OOI

DEM-002

DEM-003

DEM-004

DEM-005

DEM-006

DEM-007

DEM-008

DEM-009

DEM-OIO

DEM-OII

DEM-012

DEM-O\3

DEM-014

Union ofindependent Dissidents: "Memorial Conference for the Poet Nexhat Hakiu"(MG­$100)

Women's Center: "Promotion of Women's Participation in Politics" (MG-$1,272)

Kavaja Community Center: "March 26 Democracy Painting Contest" (MG-$500)

Society for Democratic Culture: "Elections '96: Informing the Voters" (DAG- $29,998)

Albanian Helsinki Committee: "Annual Operational Budget" (DAG - $30,000)

Society for Democratic Culture: "Radio/TV Spots for Elections" (MG-$3,000)

Society for Democratic Culture: "Media Monitoring Campaign" (MG-$3,000)

Albanian Youth Council: National Symposium, "Youth Policy in Development" (MG-$4,760)

Albanian NGO Forum: "NGO Networking" (MG-$5,050)

DeMeTra: "Developing Communication Skills in NGOs" (MG-$5,000)

Society for Democratic Culture: "Media Monitoring of Albanian National Elections '97" (MG - $7,941)

Society for Democratic Culture: "Elections Monitoring '97" (DAG $29,925)

League of Pensioners of Albania: "Parliamentary Candidates: Together at a Round Table with All" (MG-$I ,319)

Union of Vlore Intellectuals: "Parliamentary Candidates Face to Face with the Electorate" (MG-$2,498)

2

MG • Mlcrogrant lOG. Institutional Development Grant OAG 101 Dovelopment Activities Grant

R'I'

6/17/97 7/29197

6/25/97 12/31/98

9/16197 11/30197

10/18/97 11120197

311198 11/6198

3/1/98 5115/98

4/10/98 5/6198

4/1198 6/30/98

817198 9/30/98

8114/98 9/30/98

1111198 11/30/98

01101199 06/30/99

ORT Albania Domocracy Notwort< Progrlm Cumulativo ll,t 01 Grllnt, 010 Fobru01Y 1.11199

DEM-015

DEM-016

DEM-017

DEM-018

DEM-019

DEM-020

DEM-021

DEM-022

DEM-023

DEM-024

DEM-025

DEM-026

Law and Rural Women's Rights: "Improving Democratic Culture among Rural Women in the Parliamentary Elections '97" (MG - $1,380)

Foundation for the Reconciliation of Disputes: "Promoting Tolerance, Understanding, Culture and Improved Capacity in Treating and Resolving Conflicts" (IDG- $15, I 00)

Young Researchers of Social Sciences - Shkodra: Civic Education Project: "0 Tempora? 0 Mores!" (Now? or Never!)(MG- $1,910)

The Women's Legal Group: "Building a Partnership Between Women Deputies of Parliament and the Women's Legal Group" (MG - $875.00)

Society for Democratic Culture: Media Monitoring in A Non-election Environment ($9081)

The Albanian Human Rights Group: The Protection of Human Rights through Improved Enforcement of Judgements (MG-$1895)

Foundation for Juridical Culture: "Constitutional Publication" (MG- $1195)

Institute for Contemporary Studies: "An Ombudsman Institution in Albania" (MG- $2950)

Center for Economic and Social Studies: "Citizen Review of the Draft Constitution -Korea" (MG- $1390)

Center for Economic and Social Studies: "Citizen Review of the Draft Constitution -Gjirokaster" (MG-$1420)

Society for Democratic Culture: "How to Vote Correctly" (Constitutional Referendum) (MG-$2500)

Albanian Center for Economic Research: "Improving Municipality Services: Developing and Implementing a Local Level Anti-Corruption Action Plan" (MG-$5,000)

3

MG • Mlcrogrant lOG· Institutional Development Grant OAG = Dovelopment Activities Grant

~

04119/99 06/04/99

06/10/99 11110/99

06/05/99 09/30/99

DEM-027

DEM-028

DEM-029

Albanian Human Rights Group: "Center of Testimonies on Crime and Genocide Against the Kosovo Albanians" (MG-$5,000)

Institute for Contemporary Studies: "Efficient, Non-discriminatory and Transparent Public Procurement Law" (MG-$4,960)

Albanian Foundation for the Reconciliation of Disputes: "Implementing New Mediation Law as an Alternative in Conflict Resolution" (MG-$5,000)

NGO Service and Network Grants:

1111/95 10/31/96

7/15/96 2/15/98

4/1197 7130198

6110/97 6/28/97

5117/97 7/31197

1/1198 8/31198

5/15/98 6115/98

ORT Albania Domocracy N.two~ Program CvmulotlYo Usl of Gront. e10 February 1,1999

DEMNK-OOI Albanian NGO Forum: "Institutional Capacity Building Project" (IDG-$15,208)

DEMNK-002 Albanian Youth Council: "National Program to Extend a Youth NGO Network" (IDG­$14,984)

DEMNK-003 Women's Center: "Effecting Public Policies related to Women through Dissemination of Information on Gender Issues" (IDG-$14,980)

DEMNK-004 Albanian Youth Council et al.,: "Live & Vote" (MG- $2,990)

DEMNK-005 Professional and Business Women's Association et al.,: "Promoting Women's Participation in the Electoral Campaign" (IDG - $7,970)

DEMNK-006 DeMeTra: Institutional Building of DeMeTra - "A National Management, Training, and Consultancy Organization" (IDG - $\3,630)

DEMNK-007 The Local Coordinative Forum for the NGOs in Elbasan: NGO Law Training in Elbasan (MG - $623)

4 MG • Mlcrogrant lOG -Institutional Development Grant DAG J:I Developmont Activities Grant

f3

SOCIAL SAFETY NET SECTOR

3/15/96 11/15/96

3/1/96 1/31/97

5/1/96 8/31/96

7/15/96 10/15/97

8/1/96 10/31196

7/1/96 9/30/96

2/1197 12/30/97

2/15/97 4/15/98

6/15/97 9/30/97

6/23/97 7/15/97

11/5/97 4/30/98

11122/97 12/31197

ORT Albania Domocracy Notwork Program Cumul/,1l1voll,t 01 Grant' Blo February 1,1999

SSN-OOI

SSN-002

SSN-003

SSN-004

SSN-005

SSN-006

SSN-007

SSN-008

SSN-009

SSN-OIO

SSN-Oll

SSN-012

18 Grants Total Amount: $103,464

The Albanian Resource Center for Health: "Albanian Medical Ethics and Law Handbook" (MG-$3,975)

The Family Planning Association: "Improving Reproductive Rights in Albania" (!DG-$13,000)

The League of Albanian Anti-Communist Women: "National Platform for Action" (MG-$2,094)

Useful to Albanian Women: "Monitoring Center for Drug and Alcohol Abuse" (!DG-$15,690)

Albanian Patients Association: "Charter of Patients Rights" (MG-$734)

Humanitarian Assoc. Of Labor Invalids: "Labor Invalid Identity Cards" (MG-$1,920)

Association to Assist Mentally Handicapped Persons - Pogradec Branch: "Improvement and Implementation of the Law on Social Assistance for Mentally Handicapped Persons and Caretakers" (MG-$I ,800)

Albanian Hemophiliac Assoc.: "Campaign for the Identification of People with Hemophilia & an Evaluation of Their State & Treatment" (MG-$3,760)

Law and Rural Women's Rights: "Assessing Violence Against Village Women" (MG-$1,831)

Albanian Blood Donors Association: "Save a Life - Give Blood During the Crisis" (MG -$3,000)

Law and Rural Women's Rights: "A Law Addressing Family Violence" (MG - $2040)

Albanian Paraplegic Association: "Building an Enabling Path for the Disabled" (MG-$1170)

5

MG • Mlcrogrant lOG. Institutional Development Grant OAG = Devolopmont Activities Grant

8'y

1111197 7/15/98

4/10/98 12/20/98

5/6/98 10/31/98

5/1/98 5/31198

SSN-013

SSN-014

SSN-015

SSN-016

Useful to Albanian Women- "Drug Monitoring Center" ($15,270)

Albanian Disability Rights Foundation: Building a Government - NGO Partnership on Law For Disabled Persons ($2990)

Law, Business and Rural Women - "Institutional Strengthening of the Association" ($3200)

Albanian Family Planning Association: "Improving Reproductive Rights in Albania - II" (MG-$150)

NOO Service and Network Grant

3/15/96 3114/97 SSNWK-001 The Albanian Resource Center for Health: "Health for All Center" (!DO - $16,700)

12/1/97 1131199 SSNWK-002 Health NGO Forum: "Strengthening the Network of Health NGOs" (!DG- $14,140)

ENVIRONMENTAL SECTOR 11 Grants Total Amount $44,881

7/1196 7/30/98

7/15/96 1115/97

7/1/96 11126/96

711/96 10/31196

2/1197 12/30/97

3/1197 5/30/97

ORT Albini. O.mocr.ev Notworil Proor.m CumuleUve List of Grante eJo Fobruary 1,1999

ENV-001

ENV-002

ENV-003

ENV-004

ENV-005

ENV-006

Association for Protection and Preservation of the Natural Environment: "International Symposium on Prespa Lakes" (IDG-$14,225)

Biologists Association: "Reform of Teaching Programs in Environmental Education in High Schools" (IDG-$7,170)

Albanian Ecological Club- Mirdita: "Regional Seminar on Reforestation of Rubiku Hills" (MG - $2,930)

Association for Protection and Preservation of the Natural Environment - Shkodra Branch: "Increasing Public Awareness of Lake Shkoder" (MG-$2,325)

Albanian Ecological Club- Lezha Branch: "Reestablishing Nature Reserves in Vain and Kune" (MG$2,300)

Kadmi and Harmony: "Keeping the River Clean Keeps the Lake Clean" (MO - $2,939)

6

MG • Mlcrogrant lOG. Institutional Development Grant OAG 12 Development Activities Grant

3J

9115/97 5115/98

3/20/98 9/20/98

1115/98 4/30/98

511198 5/31/98

511198 6/30/98

ENV-007

ENV-008

ENV-009

ENV-OI0

ENV-Oll

Albanian Scientific-Didactic Association of Speleologists: "Creating a Policy for the Legal Status and Management of Karstic Caves According to Scientific and Didactic Values (MG­$3050)

Transborder Wildlife Association: "Protection of Nature, Beauty, Life: Natural Resource Management" (MG $2972)

Public Health Institute: "The Voice of Associations in Compilation of Public Health Policies" (MG - $2999)

Protection and Preservation of the Natural Environment: "An Albanian Law to Protect Its International Lakes" (MG- $1000)

Albanian Scientific-Didactic Association of Speleologists: "Mobilizing Support for a Law on the Status and Management of Karstic Caves" (MG- $2971)

ECONOMIC GROWTH SECTOR 11 Grants Total Amount $169,503

211197 7120198

2115/97 6/30/98

6/15/97 7/15/97

8/1197 4/30/98

10118/97 12/31197

11/15/97 12/15/97

ORT Albania Democracy Notworf( Program Cumulatlvo ll,t of Grant. 010 Fobrulll)' 1,1999

ECON-OO I Assistance Center for Business Assoc.lKorca: "Establishment of an Assistance Center for Business Association" ($10,156)

ECON-002 National Union of Albanian Farmers: "Institutional Capacity Building and Advocacy" (IDG­$15,000)

ECON-003 Albanian Center for Economic Research: "The Economic Crisis: Its Causes, Consequences, and Possible Solutions" (MG- $2,250)

ECON-004 Albanian Consumers Association: "Improving Consumer Protection Rights and Institutional Development (IDG - $14,997)

ECON-005 Institute for Contemporary Studies: "Mobile Business School" (MG - $2,974)

ECON-006 Organic Agriculture Association: "Promoting Support for Organic Food Production in Albania" ($2150)

7

MG • Mlcrogrant lOG II Institutional Development Grant OAG = Dovolopment Activities Grant

f'£,

12/1/97 10/31198

111198 4/30/98

01101199 12/31199

02/20/99 04/30/99

02/26/99 02/26/00

ORT Albini. Domocracy Networit Progr.m Cumulativo U51 of Gran1' a10 Fobruory 1, 1m

ECON-007

ECON-008

ECON-009

ECON-OIO

ECON-Oll

Center for Economic and Social Studies: "Qualitative Privatization and the Transformation of Public Enterprises in Albania" (IDG - $15,000)

Research Center for Rural Development: "Issues of Rural NGOs Network: Today and In the Future" (MG-$2,990)

Albanian Consumers Association: "Cooperation of ACA with the Local and Central Government on Implementation of Consumer Protection Law and Other Laws Strengthening Consumers' Rights" (DAG-$30,000)

Association of Women Intellectuals of Puka: "Small Business an Opportunity for Employment and Self-employment" (MG-$3,816)

National Union of Albanian Farmers: "Promoting Policies in Support of Agricultural Development" (DAG-$25,289)

8

MG ICI Mlcrogrant lOG. Institutional Development Grant OAG = Dovelopment Activities Grant

MEDIA AND PUBLIC RELATIONS SUMMARY EVALUATION REPORT

MEDIA AND PUBLIC RELATIONS TRAINING

21 - 23 September, 1999

EVALUATION PAPER

1. At what level you think you will be able to practice the training materials?

1 2 not at aU

Answers:

3 4 5 6 7

Five people responded with 10 Four people responded with 9 Seven people responded with 8 One person responded with 7

8 9 10 commonly

2. List 3 most valuable things you learned from this training:

• Strategic Public Information Planning • Determining the Proper Voice • Building a Comprehensive Message • Prioritizing Your Message • Managing Your Ongoing Public Information Campaign ~ Building Relationship with the Media • Ways to Get Appropriate Media Attention • Dealing with the Bad News • How to Write Press Release • Developing Public Service Announcements • Preparing for an Interview

Answers: Building a Comprehensive Message Strategic Public Information Planning Determining the Proper Voice Prioritizing Your Message Managing Your Ongoing Public Information Campaign Building Relationship with the Media Ways to Get Appropriate Media Attention Dealing with the Bad News How to write Press Release Developing Public Service Announcements Preparing for an Interview

8 participants 2 participants 3 participants 2 participants 1 participants

4 participants 3 participants 4 participants 1 participant 8 participants 5 participants

3. Are you satisfied with the material presented in the training?

1 2 3 4 5 6 7 completely unsatisfied

Answers: 8 participants responded with 10 5 participants responded with 9 3 participants responded with 8

8 9 10 totally satisfied

4. How relevant were the learning methods used in the training? (Small groups, short lectures, presentations, role playing).

1 2 irrelevant

Answers:

3 4 5 6 7

5 participants responded with 1 0 5 participants responded with 9 1 participant responded with 8 3 participants responded with 7 1 participant responded with 2

8 9

Comments: I liked the method of demonstration through the video.

5. What part of the training course you found more useful to do?

Comments:

- Public Information and working groups - Presentations and role playing

10 completely rele"'ant

- Organization and management of a Press Conference and the practices in general; - working groups; - working groups and reporting of the working group results; - conversation ( giving arguments); - press release and press conference introduction; - Building a comprehensive Message; - I mostly liked that part of the training where 3 points of the second issue on "Determining the proper voice" were explained; - I found more interesting the following issues: build relations with media; ways to attract the media attention; developing public services announcements; press releases and personal interviews; working groups and develop PSAs.

2

6. Recommendations on probable changes of this training course (materials, methods, time).

Recommendations:

• More time for the working groups; • The presence of an Albanianjoumalist to tell about his own experience in order to help/assist

in PSA writing; • Know better the Albanian reality in the PR area; • Leave more space to the trainees to explain the difficulties and their experience; • The methods to be illustrated in video recorder or cassette player; • The explanation should be more complete, more realistic; • Design a training program in the concrete conditions of public relations and with media; • More individual work; • A better balance between the time limits for the working groups and the materials that should

be prepared; • Is it possible to make it better? • More practice; • I think that it should be more concrete and practical.

7. Are you pleased with the ways trainee leads the training seminar?

1 2 not at all

Answers:

3 4 5 6 7

13 participants responded with 10 1 participant responded with 9 2 participants responded with 8

8 9 10 completely

8. How will you make use of the information you received at this training?

• Actually, we will use it in the public awareness campaigns in the field of public health education;

• My staff members will be infonned about this training and the infonnation we received here; • I would use it where I could have more opportunity; • We will try to transmit this infonnation to all the organization; • This information will be used to improve the communication with governmental bodies and

to extend the contacts with media; • I will use this information in the ongoing working process of the office I do conduct; • I would respond positively to the question "Are you going to use this information?" • To improve the materials that we use for the public; to improve our work with media; • Cross-sectorial PR, PR with the government; PR with business sector; PR with mass-media; • As a window to look for other spaces in this field; • I will try to use this information in every project that my organization implement in order to

announce it in a better way;

3

qo

• I will put in order the know ledges I got in this training; • I will use this information in our work with media, and especially in the organization's

public awareness campaign;

9. Your evaluation on the training conditions?

1 2 terribly bad

Answers:

3 4 5 6 7

12 participants responded with 10 2 participants responded with 9 2 participants responded with 7 1 participant responded with 6

10. What can be improved in the future?

8 9 10 extremely good

• The American experience regarding PR is too advanced referring to the Albanian experience, despite the fact that everybody is interested to know the most advanced experiences;

• Media representatives were missing in the auditor; • The translation English-Albanian and vice-versa took away the attention and take too much

time as well, I would suggest simultaneous translation; • More concrete examples, more illustration; • Participation ofjoumalists, representatives of the best sold newspapers in order to learn from

their experience how do they proceed, how does it happen that they could give not precise information, etc;

• The materials should be more precise and shorter, but I think that the training reached its objectives. If it could be developed with some more illustrative materials and some games it could be more attractive;

• The translator should be more active, because he didn't get any interest, especially his low voice, with no any intonation. He stayed all the time sit down and he didn't look at all very dedicated and serious. I think that the translator should improve or should be changed;

• I think that should be developed more training in other fields; • I would suggest that these topics should be developed further on, other for the

implementation of the know ledges in the work, or for the improvements if need be, thank you!

• Adopt the used materials with the Albanian reality; • Maintain these standards; • Use more examples;

4

EMPLOYMENT ANNOUNCEMENTS (RDA TIRANA, DENA)

(i)

AGJENSIA RAJONALE E ZHVlLUMIT nRANE RR. "BR1GADA 8", NR.11, nf:U\NE. ALBANIA

TuhllKlott tlOftl:U1e tn. organiZlUI nNuedhete ttaaJa si UYm. Gtt. SfN dJ. . •. Tc." attnl fie ttanhn projettl," tne ngmJefoncfelh. . Mlsiti dhelr;lmlmi; . 1.NJt"'~ 1'RI.s1lfet*S"~ ~~ngJufufteDHQJQ. 2. Cl;lloIMuntverdtare ne

"ll

NJOFTIM PUNESIMI . . . .

OIgmimbJcHl8'<'eri1an! 'SI'.wqcda KcmbilmeeBlznesitwlIi BI*nIIII' (DENA) kitkon Ii pun6$oii finanCier dIIo AsisIenII'rflgoWiii me kc/Ii Ii pIoIi. Api· kGnllldllllll16 plaliilajni ~eret a mipDshIma:

1. flNANCIERI '. ! .

Tnel6 CIIIim urMwsilw. MI\IrnUmi Ir8Yja1 piIvoiipwlO . TikelinjclulltunilirrialilPlEsCllgleZltnililclrdwnili1lllalD

• likel6nio/lllinipi.dc:wini.a """ca.".a lindrystmo lik~ • like!! mund!si I! uCNIoii blllnd.ulha iashlhendlt. . financ;ieridolipgnajisibCl!hkumediejlameiaellulivpilrmbaJjMesisla­mitfinalicicIr Ii wgwizaI!s pirzbulillflllibalegjisi lisaj ni SIIqipiri si dhe do 16 mbufcii ptOCIICiuIaIlI krIdisi piir Cllilarit allloqalii.

2. ASISTENT PROGRAMI 11 ketO cmim\llliVenilar MIIiIruni Ire vjeI pirvCji PII1It lIkeliilljQ/ui!lunllirrialisjHsmgimtnililcUdwnilislllcllg

• . Ti ketI nid'ui ni piikdolin*'e ptCOCiiae tirald •.• IikGn ~; W • Tlkel6mund!sil!udheIojObftJndcldIIe;audhendi. P!elero\IeII aplikcintal me pijIYoji pune me OIgc:IlimtalJc~~a.llwecila ni

AsislenfiIPicgtcn.l do /6 punojA sA lxIsNcu rnadt8jlerirt elczekul!vplrrrei-. himin.~ dhe dl8jlilnlne organizaIis pirzllaliminealn:degjAsi ~ti~sequmitlltl!niSliqipill.

~eid& · ..... aih8tliclcr6zojn!Jl'ClniZyr6ssiLcmdO'1d!a·n6atb­sin Rruga 'Gjin BIle Shpa!a' .Falalela AYIacIanlI.I!ytja 7. AnIIcIi ViI, laIi. Tel (42) 4C641; fax (42) A0646. r1iCV dlledV Ldallltanail<*IilllQi zarlli mbyllur.Afalilfllnd~idotizimitlii~dalijellmeddl22TIIar.I999.

LETTERS FROM ARDTlRANA

ARDELBASAN ADRF

Expressing their satisfaction for the quality of the board retreat program

12 Tetor 1999

Dr. Lori A. Jenkins ORTIUSAlD Demokracy Ntwork Ptogram

Dear Madam,

in the name of Tirana "Regional Development Agency - SME" Foundation, we thank you for your support on excelent organization of Ohri retreat for Development, Leadership, and Strategic Planing ofNGO, with our Board of Directors.

The members of the Board of Directors, gained a "Jot from the great performance of the seminar and would like to stress their comittment on sharing their experience with other members and our executive staff. Obviously, their role regarding the development and sustainability of Tirana Foundation will be much higher then before.

Again, our coolaboration with your Organization in the future will be fruitable one. Please trasmitt to ORT Democracy Networtk Pogram staff, It's Director our best wishes.

Sincerely yours

12 Tetor 1999

Edmond Spaho Drejtor Eksekutiv

-.-

Qendrra Kombetare Burimore e Trainimit Dhe Asistences Teknike

I nderuar Z. Spaho.

Ne emer te Fondacionit "Agjensia Rajonale e Zhvillimit -5ME" Tirane, ju falenderojme per organizimin e shkelqyer te retreat-itne Cherte Maqedonise per Zhvillimin, Udheheqesine, dhe Planifikimin Strategjik te OJQ-ve me Bordin e Drejtoreve te ARZH Tirane.

Pjesetaret e Bordit te Drejtoreve te ARZH Tirane sidoqe jo ne nje numer maksimal te pritshem, perfituan shume nga nje seminar i permasave te tilla dhe shprehin perkushtimin e tyre per te ndare eksperiencen e firuar me anetaret e tjere dhe gjithashtu me sta:fin e ARZH Tirane.

Basbkepunimi yne me Qendren qe ju drejtoni do te jete dhe ne te ardhmen i frutshem. Duke shprehur dhe nje here optimizmin tone per kete bashkepunim ju luterni te trasmetoni stafit tuaj. konsulentes Znj. Veta Xhokaxhi urimet tona me te mira.

Sinqerisht,

Ilir Rembeci Drejtori Eksekutiv

q1

®

Fondacioni Agjensia Rajonale e Zhvillimit (SME-s) Elbasan Elbasan Regional Development Agency (SME-s) Foundation

Per. z. Edmond Spaho, Drejtor Ekzekutiv, Qendra Kombetare Burimore e Trajnimit dhe Asist= Teknike Rruga Mustafa Matohiti, Nr. 16, Tirane, Albania

TdlFu: 4247603; 47604

From: Naim Cope, Drejtor, Fondacioni Agjensia Rajonale e Zhvillimit (SMEs) Elbasan

Date: 6 Tetor 1999

Subject: Leter falenderimi

I nderuar Z. Spaho,

Ne emer te Anetareve te Bordit te Drejtoreve dhe personalisbt dua t' Ju shpreh falenderimet dhe konsideraten tone te larte qe Iu perzgjodhet organizaten tone si nje nga kater organ;zatat te Cllat jane perishire ne Programin e Granteve te ZhV111imit Institucional ne kuadrin e Programit te ORTIUSAID Rrjeti i Demokracise ne Shqiperi

Te gjithe Anetaret e Bordit te organizates sone te cilet Moren pjese ne trajnimin e organi21!ar nga QKBTAT, :zhvilluar ne Oluid, nga 25 Shtator - 3 Tetor 1999, ju shprebin Ju dhe staiit tuaj, falenderimet dhe vleresimet maksimale. Nepermjet ketij kursi trajnimi ata paten mundesine te marrin njohurite baze per ZhviIimin, Udheheqjen, dbe Planifikim Strategjik te OJQ-ve, e cila kontribon ne rritjen e kapacitetit te Udbeheqjes se organizates sene.

Deshiroj t'Ju shpreh dhe nje here kenaqesine dbe konsideraten tone me te lane per fillimin 'e mbare te bashkepunimit dhe te realizimit te objektivit tone te perbasbket.

Sinqerisht,

/~~ Naim~pe Drejtor Ekzekutiv

Lagja Hekuruclha, Prane pall. 107/4, Elbasan, Albania. Tel. & Fax: +3555452857 e-mail: [email protected]

. "~';. -- . ..

erg

I I I ; 1

\

Gazmend Xeaj. 11:23 07/10/99 -0, thank you letter fram Da~

To: [email protected] Organization: Regional Business Agency Date! Thu. 7 Oct 1999 11:23:34 -0100 (GMT) From: "Gazmend Isaj" [email protected]> Subject: thank you letter from naim Lines: 25

Dear Lori,

Sorry I have not written or been in communication with you for a long time. I have been very busy and traveling out of Albania. Of course, this does not fully exCUSe me.

On behalf of the Board and myself, I would like to thank you for all you have done in support of our Organization since 1998. We are aware that your contribution bas played a key role in the selection of our Organization as one of four organizations involved in the ORT programme for Institutional Development.

I am convinced that the objectives of the training course conducted in Ohrid and the expectations of the participants (members of Elbasan RDA Board) were achieved. I have contacted with all members of the Board and through their feedback I would forward to you that they found the training very useful and they highly appreciated it. Through the talks with them I have identified that the gap in their knowledge which they had before the training now is really reduced. It is a very good start for our cooperation.

once again I would like to th~ you for the special support you are offering our Organization.

Sincerely,

Nairn

~rinted for ALori A. Jenkins" [email protected]> 1

ORTIUSAID

RRJETI I DEMOKRACISE

TIRANE

Znj. Lori A. JENKINS KeshiUtare per ZhviJJjrnjn Organizativ

Znj. Lori ,

Do te desbironim tJu shprebim edhe njehere falenderimet tona per mundesine qe i dliate anetareve te bordit te FSlIDP - se per te marre pjese ne ritritin e bordeve'drejtuese te OJQ - ve per zhvillim;n , udbeheqesine dhe planitikirn;n strategjik organiZllar nga qendIa juaj nga data 26 shtator deri 2 tetor 1999 ne Oher te Maqedonise. Pjesmarrja ne kete ritrit ishte lUe eksperience e vlefshme per te gjithe anetaret e bordit te FSHDP- se ne ngritjen e tyre profesionaie per nje trajtim me te mire te problematikes se OJQ-ve. Menyra e organizimit te ritritit ne formen e alternimit te anes teorike dhe asaj praktike (krijimi i produkteve ne grope te vogla ) ishte mjaft frytdhenes . Per te gjithe tematiken qe permbahej ne materialin e ofruar nga qendIa juaj, u shfaq nje interes i v~ante ,pas; ofronte nje konceptim bashkekohor te organizjrnit te punes se OJQ-ve. Urime dhe ju personalisht per udheheqjen dhe drejtimin e punes te stafft shqiptar si dhe rezultatet e shkelqyera te ritritit.

Per Bordin e FSHDP - se

®

· -....... -.~."., .. . -"'--._--

ORTIUSAID

RRJETI I DEMOKRACISE

TIRANE

Z. EDMOND SPAHO

Drejtor Ekzekutiv I ANTIARC

Z. Edmond,

Do te deshironim t'ju shprehim edhe njehere falenderimet tona per mundesine qe i dhate anetareve te bordit te FSHDP - se per te mme pjese ne ritritin e bordeve drejtuese te OJQ - ve per zhvil!jrnjn , udheheqesine dhe planifikimin strategjik organizuar nga qendra juaj nga data 26 shtator deri 2 tetor 1999 ne Oher te Maqedonise. ~esmanja ne kete ritrit ishte nje eksperience e v1efshme per te gjithe anc:taret e bordit te FSHDP- se ne ngritjen e tyre profesionale per nje trajtim me te mire te problematiJces se OJQ-ve. Menyra e organizimit te ritritit ne [ormen e altemirnit te anes teorike dhe asaj praktike ( krijimi i produkteve ne grope te vogla ) ishte mjaft frytdhenes . Per te gjithe tematiken qe permbahej ne materialin e ofruar nga qendrajuaj. u shfaq nje interes i v~ante .pasi oftonte nje konceptim bashkekohor te organizimit te punes se OJQ-ve. Urime dhe ju personalisht per udheheqjen dhe drejtimin e punes te stafit shqiptar si dhe rezultatet e shkelqyera te ritritit.

Per Bordbl e FSHDP - se

Suzana SAKlQI

C--, "7eL .. ,' ".)

®

NEWSPAPER ARTICLES "ALBANIA'S ROAD TO DEMOCRACY"

- .. _ ... - , < .

ALBANIA . s:

Nie Durham lieler, n~ ''vendin e shqipo~iave" •

. , NtTJji:shlm <1997 .... njl tnrrZrikJml dhz njish- doj p& Ii mllni '1!PtIm, nl~;"'" njl eJ:ip~, ,si_""""-; nisin Ildhltimin n< ti DiHIi Slfllip<rinl pir Ii layer . _ Zi, jml:ins;li

· nilltstiln IIIIjtrt:I>< nl lidhjt ""'4!i.lt.p&s1umi Ii .~ p" tldlb-· -!!rjoj 'mk. t J'lWavtsh ... dhz .. poshpj.~hm" bml J:!I=' !'<riP< ~ t P,WIO&!J'is ~ shbqtt ~fIl4Jf ni 1:7izi1J~" '4ilt... .

· pirgjObhmt. '. ,-><:" '.' ':." ·':f:· .. ":Udhilimtql:f . ..;. .. fly ~,·nl36 rrttNI. .go 29 :;;u,!ari bIT '! ¥ . t.r. lIl.muOn ~ ,;

IUihllimi i p<ri n< i.cJii dhz <IDi iii IIli Ii Jimdil nl . ~ om njlf= fi<rm< 25 .mlDr 1997; .... m:iqtttrrup, itt"l!ijt. JI'lnl. ~ iij4 se si I!ondi:sh qtmbtntnfnvdd:jm. m<!miJlyshj<ltnjm= ·~shuinl. $Iw1nl~, ~ flplDlismupy<iisoritopojD. mtWshIiri:lillenji . d1bi lUll ~ bm mj<disi ku.fhptsh mviogonin uji dht.1mk4. '(Jlr II gjt- ~tbu. /:;hb! 111'".. -·Ii. ngjrrrjer;< ti ~ Mbi 800 py.: . iii rrvgl. /:;hb! '*

.. 'eljtp&mth l?O!J:I6!Xisllqiplo7t7rgO vm.:. ~JIlgIl::. Jlforruzi qlti fti'" s1iqipirisi:. .. :~:." '~i' ~'.:-" .~.- -~ :. :_-~·l-4·"';7~ .. · •. :~cil4 mun4 Ii Lzr

· . u,,; lmlinS, '.i.m~ qi pm/JlDi ~ .. - '. GnIpi i ~ - b. ishl< friJ<l1l sJr?6sjt ~ ~ qytrtif. • IidJ2 shtJftri t!ht: jo ml jashlf fij. nlplr ktIttsIil' ~ qt /lid: dihtj .. - konbDnozr "" dh.

· fftI,e I.hihni •• shpj., •• P.ir gout ... ° Alboni.t°, - /IUf.1l zbolimillt · qeRimin. nji""'/imi Ii liLii: 'Si Iiriwst wniMm- ';:_ /(iIDbmlqrro · iIDotrqi! dQ If ishtz.mi intms Il,,,mj_ dis;> Ii dMM • .bnts. tdLr.lapoi

Il..rbz pir'Shqipmne dhz ftIinytIIMl t miri pir lO «liT p& t'i slip< /1m k<t •. isI!k lji Ii pgesj. dmtt shqipllUfL" ISh,.. :.sInm:i If kuj<ks!i:. .m.mi t puii~ piT ....... qt >IVk ltish .. 0$I!jl1blj Ii .. t!ht: mvtim wm5r dhlnl sIlIlisfllm2 'Ii .go ndiyWmtt ~ citit lS.92...... -ill dQ /Q ~

.. ~ .,.,....,..- -... ,....,... _~ A. w..l.;"~' •. . :~..;;"-,,,. ......... ...,

1°}

. E dieL 26 s~tator 1999 ;11:

.ion m.h.t qlliPY<s~~' ':' ' .• "ii;;;"~ ~pir li!krytrizll_~ ~shplr- kltl¢'ll/fr. F.JWmblrrgulpSZ"laj4- <4he l:u/j." .' . ' ':' . . Irurmi,-",n~'I4Iisw... LDrinukdo tilin~".~ dyfllmilj!: nt gjU. dJJldmslJltuArngujirmm­:epciJlgogolsllljip_K41iA. "ni~!dI ... ahgi_gW:is1tin llnl m~ Pam-. ~ittlin·l·1yJE. Dh<si piD IljeriqigjmMtpma1Ii l', ;uk do Ii binb! ~ 1ISgjl.· 'zroJi. =imi. po tmn/.njofzW. dilL m.tUsh. par m. nji ,.,ui/tli It ri <4he Lm ]...m.s.a bijuu ....... :11 j c'l"" tdh< sat. I:luj >h~ diIL'JIltI!liimtmbin:izlilrtin shqiptzzr. J<mi dimin < ;"1 pi! XRmmin. "E.s1Ill njl ngo bJpo-

1 :" , .' '1: .,' .Wzhgu.a:. ·"rpmarUdi. inlimt, sl> i Ihdsan ojiJ, nmlll "'t. i?'_1i Ii sIrDqitisi shqipl4lr. ~ :<rtlnlrir<ngfiiF.r.iz.m- piT /'.; rr#zf.lIg •. Pi=. tyrlDrt. p"nls nl ORTjus. t#mi im p<7S(I1Uli'qi mblsh/ttri .go rmd_. It. muzgt'l Ii i7!bIzmu ",. 1\lD.:d!!<:"l";=UlIlt<f' Mhgim;, '~1.' ". s.rwjnnit i!shli 'Ii bnuni pMbr njl plObltm mi 'n: ql JmR S< trz· nisft: kilt .. Njejrlbri1rf' shl:41i77l1<lT. I. wart,foMn:/t.Jriki Ii l1IJJJih iigo (btsojni rsjorziL lbri jet - • ".,.. DItt Urn ~nl J715;I!f1n~ ""gill kiqija. per mI7i rr gfiJlui • . intmsv.,,,.,¢siuftn .l:IImmitdhuiwqlte7rIJJ. .~ S< ishlr .jE ';twlt ~ """'guljo.pir.jdtn, jtmi del4j<l ngo gjmdja, tritit . izQj njl SIlTDI!jim tjtiir.qlll P!ftS nlll gjiIhi!h­·ur. j. Il gfitha. "...;-illm· '97, 1t.cilit f;JJ;!! mixtuT Il jiksUQ,. .lflelit t ~t. qiplrinlpiTkiIZ«pmmDDjnilZbz. NukpolJar kur h'sh", btmdiI qi i/l1rrin ,Ii Lt1ri~ Midi$-'lyTt .dh .. humi py<tj<. EdM SlJt pos ql anum <Shli rift gil <". ast' mirf.l'''Hjo ql 'whmistpsdishu _ . dyPjtti!h; aj4 ....... htshtiri IE gjijl: pagfigj. plr . JcitJi<shJl njl gjltltrid iir!nnlc,..,rlisjrhm<.I;JIr< "III dilLmem njl: irugi ~Z':. .JU!qnii J1Ydjt 1/.i41Il drtj/uQrT>tb!s.' , . . .shumlnj .... """, btSlljnUbt nuk, bpltJjnllttM 'lhatlojo: .<:.,;:'" .;: .Kw-d<ltilDlsigvrinlkiltvtnd? '. gil" -tMtfajc. ' .. :'. '. Ii ciIin ishft Imi JmDns.Fo~1 jD, - /halt oj. ".. pyitj .. t shknuu • Lm Jmkins nul: mbon inUilm-. Par ~.11!IlIi

·;sigurtmipriwtt.".nci Ii nifditpr tiy~l.lIIiport. dilL mmdoj .. tGIie shumi . . "hIm diu iU-plr Ii shknuu' diu Ii ... ".. Sh­'cmnl, ~ dilL ryr-- sIvP'P¥ nlll: t _ Jlirgjigitn t Jcisaj py1!tjtjt:.:" . qiplrini. JGoj, shumi Ii dhlJw 'If muM I'; ht1It,.z < flllUlnljtti ciPil< iIhe tyr-'. IIsfrymin, fApiomzm;l nuJd., arritur III shTkoji libir".Mli!jiIhaJZ. p!lM,"rIljdlliZUt.ukilishumE ,·lJtlmtli';gur2lstmtri- • nt SIzqipm.. RCnga >iii; ~ t deri ml siJI. tljo Ju:pesiri plr t< shmuIT iddl. tUil.zt P"fmm. (i

·'pCrliihlnlStfo.tii.1;ishIe }nmdon st. "'-'" :.. . • mIMjl: sam. PilWr tyr<. mtI7n Ii ~-­::i/j<!>t. "MmsiDj st ishim '-" "ShqiptrW .. ,lyli ~ oji! wn~ til pc plrpiqet . irlimin, Mimi1997~ "lbriduii9i 1Il~ iogjl:,lX7ldostm m<Jcujdts ptr 4<ma1micinC, Njei'l:it nuk pa i hlpl'j,,1: dOl ptrsm so mi shptjt qilijtJt. mimdurqllishiltDj "''''- Parishim IfWruJqsur ~Ii" tyn hbijnlJaj/Qr< piD <j<Mi.' . n<stsIvP'P_t_llnj<jtitropirriDn'lilishin..w .;; diIL'qEasgji mtkdo liM . '. Paraj4qld<l-fi binti! mishulnlp<!shtypjt .... li· dy tril.< tl shhimL." thoriltjo, pET Ii pm ruby­-. ScI ~ qi l:ishini ndDnji . .. ishb!: Kiln""; dh! Ki.Jcmanjtl """ shqip_ SI slrimtl t <>pin"""", gjaIi ~dy~ Dh< m<k h-..zhdorrim." SidD:faftl ~ ~./OYJij ll!i!'t II alit .bznCrin£ nll:imlal:t"": ' dWl nlst siD IZ shb=j< oF *'" _ tl1w: .­'iNpirkiledeshmon nji /;iii mrlilrl..tlt< tljo·liod:ttt ",ditur iIht nj< pj<si!" ~;_dilLpy<ljtfd<lJljtnl""u;1l_1997.

. . ' mitt. diJtW Ii sojls"i. mbusJUJr mt JmRgroft"..' .' . . R<r= ~ -t • -: _ ., •

' •• j •• -.

i .,:. t9~j'J~e.nl<.i:rt.s.: 5 niintor' ~~7) ~, :.: .:.:- .. '~; "i: .... ::.~;.

BEST AVAILABLE COpy .- ... ~-,.~ .... s~_ '. -, .

-"~ itIlonsiInIo iIe- edhe poe - i n;v­juar p<:r shblc ~ Qalananjes dho kishbl U! ~ I!! yrit<j. aj rnendon!e<e I<anuni es/i!e j INri! dhe; nev~dhedUhettt! .... 1 t ~lOtnl!5hq1peri. Kur unl!. pyem lie (uwndonIr. si do ti! "P"A'" njeri!zit pi< dorezimin. anniIW.al ilia saqewr;a

. duheI Ie bi!je ligje Ie mlra <!he Ii! fona p<:r armet. ~ U! jet\! It! pill .. sI "u. dhe IE zfa1ohon. /Ii ;,hte shimu! i bindur se po ll! nilodh!e lejo. secili do (i 'dori'2anteann!t qHi.h.· . . .' .

·-Vazhdci dub! theni! Sf: ".,eli e kup!Dn ~ gjaIcmanja do ll!-'nI!numI't, p!'ldeisanjori!zit

. jaN! II! arma=tr. MendonlI!!e qevena duI>et Ii! mbledhI! ann!! me ¢o m.hl. Thel<>i qe virile ai n!! tu!Voji'n pi< Ugje afa~ Ole II! ~ snbi!shIetej ni! bindjen .lij ~ I=nI! Shqip@ri"'" njI! qeveri e .... shpesh UgJet ~ -

. II! ngjaShme "!O njereI; !If tj<n! zl>gJanin Ii! njI!jI>t bindj .. Kjo pasqyrai pasigurini!.~ Ii.dhur ·memar~:. _ ...: .

" -.

(jj)

· ._.:.-:-. ~''':~ -:_,..z __ -.: .~ ".

"

.. ~._. "_,". '~.' ' .......... 4'

' .. ". ,- '. "'

., /~ . "-" . .

RDA ELBASAN ARTICLES PRODUCED AT THE RETREAT

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

-MISIONI

Mbeshtetja e zhvillimit te biznesit, inkurajimi i zhvillimit ekonomiko-strategjik, te rajonit dhe krijimi i partneritetit midis pushtetit dhe subjekteve publike dhe private, nepennjet ofrimit te asistences teknike, hartimit te programeve per zhvillimin ekonomiko-social dhe zgjerimit te bashkepunimit me donatore te ndryshem dhe me organet e pushtetit.

VIZIONI

Zhvillimi i qendrueshem - sfide ndaj te sotmes, siguri per te ardhmen.

,

.---.-~----.

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

OBJEKTIVAT E PERGJITHESHME DHE SPECIFlKE

Objektivat e Pergjithshrne Objektivat Specifike

1. Te ndihmojrne ne rritjen dhe zhvilirnin ~ Te afrojrne sherbime konsulence ne e biznesit ne rajon menaxhim, marketing, sekretari finance

e kompjuter per rreth 20% te bizneseve te rajonit deri ne Dhjetor tevitit 2000

~ Te kryejrne nje studirn per import-eksportet ne rajon deri ne dhjetor te vitit 2000

2. Te ndihmojme ne hartimin e planeve ~ T'i afrojme konsulence komisionit te strategjike per zhvillimin ekonomik- zhvillimit ekonomiko-social te rajonit social te rajonit per pergatitjen e projekteve sipas

standardeve nderkombetare per nje periudhe 4 mujore

~ Te kryeje nje studim rnbi gjendjen ekonomiko-sociale te rajonit deri ne korrik te vitit 2000

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

PLANI I STRATEGJIK I MARREDHENIEVE PUBLIKE

OBJEKTIVli: Te ndihmoje nepermjet nje fushate ne krijimin e nje jizionomie te mire ,te besueshme,serioze per ato objektiva dhe aktivitete qe do te kete organizata e jOlle F ARZH .

----"----PERSONAT

AKTIVITETET PERGJEGJES -----------------------_." .. ,-----_.

1. Penniresimi i infonnacionit qe per te jep profilin e organizates.

2. Zgjedhjen e klienteles duke sunuar edhe kalimin e kufijve te rajonit me nje komunikim te vazhdueshem me to dhe institucionet dhe subjektet e ndryshme.

3. Rifreskimi dhe zgjerimi i kontakteve me perfaqesuesit nga pushteti qendror dhe lokal qe merren me problemet e zhvillimit ekonomiko-social dhe te nxitjes se biznesit.

-- ~ - --_.---.- .

//g

Kryetari Bordit, Drejtori Egzekutiv, Kryetari i Komitetit te Marredhenieve Publike,Programeve dhe Aktiviteteve.

Drejtori Egzekutiv

Kryetari i Bordit, Drejtori Egzekutiv, Kryetari i Komitetit te Marredhenieve Pub like, Programeve dhe Aktiviteteve.

BURIMETE AFATI

NEVOJSHME KOHOR

Kontaktet e ndryshme, I Gjate gjithe Fletepalosja, Buletinet vitit infonnative

Njohjet personale, bashkepunimet e deritallishme, projekte te kryera bashkarisht,etj ._.

Gjate gjithe vitit

Tetor - Nentor 1999

4. Te behet nje promovim i studjuar dhe i Kryetari i Bordit, Kryetari i Komitetit te Llojet e ndryshme te shkallezuar permes: Marredhenie Pub like, Program eve dhe mediave, dhe kanalet

Aktiviteteve. e mundshme te komunuikimit

a. Organizimit te nje konference shtypi per Kryetari i Komitetit te Marredhenie Dhjetor 1999 prezantimin e F ARZH-it (Profilizimi i Pub like, ProgrameVe dhe Aktiviteteve. tij,vizioni objektivat, shpemdaIja e nje komunikate per shtyp, etj)

b. Emisione radiofonike me pjesmaIje nga Kryetari i Bordit, Drejtori Ekzekutiv Tetor 1999 F ARZH-i,biznesmene,pushtetlokal ,organizata te tj era joqeveritare dhe dhoma e tregetise.

c. Ngritja n e problemeve shqetesuese te Drejtori Ekzekutiv Llojet e ndryshme te Gjate gjithe F ARZH-it ne median e shkruar dhe mediave. vitit elektronike.

d. PjesmaIjes ne panaire. Kryetari i Komitetit te Marredhenieve Mars 2000 Pub like, Programeve dhe Aktiviteteve

5. Gjallerimi,zgjerimi i kontakteve dhe mbajtja e Drejtori Ekzekutiv Kontaktet, Gjate gjithe nje korespondence te rregullt me fondacione Eksperincat e vitit analoge qe veprojne ne Europe dhe ne bote, si meparshme, etj. dhe me institucione te specializuara per dhenien e trajnimeve si- FAO,ILO,VOCA,PAPA,GTZ, etj.

6. Rifreskimi i fletepalosjes dhe pregatitja e Drejtori Egzekutiv Shtepia Botuese Janar - Shkurt mateIjaleve te tjera promovuese si-katalogu i ONUFRI 1999

//1

,

//..2

qendres,logoja e saj si dhe simbole te tjera qe i sherbejne marketingut dhe promocionit te F ARZH­it.

___ ,. _______ -'_ .. _0"-

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

PLANI STRATEGJIK I SIGURIMIT TE FONDEVE

Objektivi: Gjenerimi ivazhdueshem i fondeve te nevojshme per zhvillimin e organizates nga tif gjitha burimet e mundshme.

AKTIVITETET PERSONAT BURIMETE AFATI PERGJEGJES NEVOJSHME KOHOR

1. Percaktimi i qarte i objektivave qe organizata deshiron Kryetari Bordit, Drejtori Egzekutiv, Kontaktet e ndryshme, Tetor-te realizoje brenda vitit 2000 me afatet perkatese. Kryetari i Komitetit te Finance- Fletepalosja, Buletinet Nentor 1999

Revizionit dhe Sigurimit te Fondeve. informative

2. Kryerja e studimeve rreth interesave te donatoreve qe Drejtori Egzekutiv. Informacione te Nentor-po operojne ne Shqiperi mbas ndryshimeve qe solli ndryshme Dhjetor 1999 kriza kosovare.

3. Pergatitja e nje liste te hollesishme te donatoreve dhe te Drejtori Egzekutiv. Buletine te ndryshme Tetor-organizatave te huaj a qe veprojne ne Shqiperi informative Nentor 1999

4. Kontaktimi me angjensite donatore dhe me Kryetari i Bordit, Kryetari i Komitetit te Pergatitja e letres per Shkurt2000

18

organizatave te tjera te huaja qe veprojne ne rajon. Marredhenie Pub like, Programeve dhe donatorin Aktiviteteve, Drejtori Ekzekutiv.

5. Kontaktimi me organet e Pushtetit Lokal dhe Kryetari i Komitetit te Marredhenieve Kontakte te ndryshme,

Qendror.te cilet ofrojne grante te ndryshme ose kane Publike, Programeve dhe Aktiviteteve, eksperi enca te Janar-nevoje te shfrytezojne sherbimet qe ofron fondacioni. Drejtori Ekzekutiv. meparshme, njohje Shkurt 2000

bashkepunimi, etj.

6. Kontaktimi me biznesmene dhe individe te vecante qe Kryetari i Bordit, Drejtori Ekzekutiv Shfrytezimi i njohjeve Gjate gjithe shprehin deshiren per te mbeshtetur fondacionin. pesonale, i kontakteve vitit

dhe i bashkepunimeve te meparshme

7. Shfrytezimi me efektivitet maksimal i te gjitha Drejtori Ekzekutiv Shfrytezimi I te gjithe sherbimeve qe mund te shfrytezohen nga Fondacioni ekspertizes se Gjate gjithe per gjenerimin e te ardhurave qe do te mund te mundshme te vitit shfrytezohen ne favor te organizates. organizates

- .. - ------- .-.

Iii

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

PLANI I VEPRIMEVE FINANCIARE PER FARZH-ELBASAN

OB.TEKTIVI. Miradministrimi financiar i fondeve tli organizatlis.

NR. AKTIVITETET PERSONI AFATIKOHOR BURIMETE PERGJEGJES NEVOJSHME

1. Caktimi i personit pergjegjes per yeshqet Drejtori Egzekutiv. 20 Tetor 1999 Nj 0 hj et persona1e dhe financiare rekomndimet nga

anetaret e Bordit.

2. Rishikimi dhe permiresimi i sistemit te Drejtori Egzekutiv, dhe 30 Nentor 1999 Sistemi financiar po1itikave dhe procedurave finaciare. . Menaxheri Financiar. egzistues dhe manuali

Financiar I ORT -se.

3. Caktimi i procedurave te raportimit Menaxheri Financiar. <;:do muaj financiar.

4. Pergatitja dhe paraqitja e raportit financiar Drejtori Egzekutiv, Ne fund te vitit Raporti financiar. vjetor. Menaxheri Financiar.

- - - -- --- -_ .. _- -- -

I/~

5. Caktimi i personit qe do te kryeje auditimin Bordi Drejtues. Njohjet dhe rekoman-financiar te organizates. dime te ndryshme.

6. Rishikimi dhe permiresimi (ne rast nevoje) i Drejtori Egzekutiv, Ne fund te vitit Qendra e Kontabilitetit sistemit financiar Menaxheri Financiar. ApJikuar

7. Hartimi i buxhetit financiar vjetor te Drejtori Egzekutiv, Janar2000 fondacionit. Menaxheri Financiar.

8. Miratimi i buxhetit financiar vjetor per Bordi Drejtues. Janar2000 organizaten

._--" ,--- .,' ",--_ ..... -

/I~

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

PROCEDURA PER REKRUTIMIN DHE ZGJEDHJEN E DREJTORIT EKZEKUTIV

1. Konkurence e hapur (njoftim)

2. Grumbullimi i CV -ve (Komiteti i personelit, perzgjedhja e pare)

3. Intervistimi i te perzgjedhurve te pare nga Komiteti i Personelit

4. Vleresimi me pike i kandidateve ne baze te nje procedure standarte

S. Hartimi i listes me 5 kandidate finaliste

6. Takimi i finalisteve me bordin

7. Votimi i fshehte per Drejtorin Ekzekutiv (me nje quorum te perbere me 3/4 e bordit, drejtori fiton me 3/4 e te pranishmeve)

8. Njoftimi i kandidatit per Drejtor Ekzekutiv behet nga sekretari i bordit (duke perdorur nje nga format e komunikimit si teJefon, Jeter, faks ose e-mail)

9. Nenshkrimi i kontrates

/IJ

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

PERSHKRIMI I PUNES SE DREJTORIT EKZEKUTIV

Pozicioni i Punes

Drejtori Ekzekutiv i Fondacionit : Agjensia Rajonale e Zhvillimit - Elbasan

Permbledhje e Punes, Pergjegjesite dhe Detyrat Specifike

Puna dhe detyrat perfshijne, por nukjane te kufizuara ne sa me poshte:

Drejtori Ekzekutiv ete pergjegjes per menazhimin e pergjithshem dhe drejtimin e organizates dhe per venien ne jete me sukses te strategjise per zhvillimin e bizuesit te vogel e te mesem dhe ekonomiko-social te rajonit. Pozicioni ka pergjegjesine e fundit per drejtimin dhe mbikqYJjen e ekipit te menaxhimit te stafit ekzekutiv te organizates.

Pergjegjesite SpecifIke :

• Ttl zhvilloje dhe zbatoje rregullat, politikat dhe procedurat e organizates, duke perfshire aktivitetin financiar, te personelit dhe aktivitetet e tjera operacionale, si dhe te siguroje pershtatjen e tyre.

• Te zhvilloje dhe zbatoje sistemet operuese per te gjithe komponentet e organizates.

• Te reicrutoje, te punesoje dhe te pushoje nga puna punonjesit e organizates ne perputhje me politikat dhe procedurat e percaktuara.

• Te mbikqyre stafin dhe te drejtoje vleresimet e rezultateve te punes se stafit.

• Ttl identifikoje dhe te perpiqet per sigurimin e fondeve te organizates dhe bashkepunimin me donatoret, nepermjet propozimeve me shkrim, fushatave te mbledhjes se fondeve, nderveprimit me donatoret, zhvillimit dhe kryeJjes se aktiviteteve dhe sherbimeve qe nxjerrin te ardhura, si dhe inisiativave te tjera.

• Te monitorizoje dhe raportoje mbi burimet financiare te organizates.

• Te sherbeje si zedhenes shtypi dhe promovues i organizates; te vendose dhe fuqizoje marredheniet ndermjet organizates dhe organizatave homologe, organizatave nderkombetare, agjensive qeveritare, burimeve te medias, komunitetit te bizuesit, OJQ-ve te tjera, si dhe publikut te gjere.

I~

• Ie zhvilloje dhe mbikqyre fushatat e marredhenieve publike te organizates.

• Ie pergatise dhe kryeje aktivitetet e zhvillimit te Organizates duke perfshire inisiativat e Komisioneve te saj.

• Ie marre pjese ne takimet e kerkuara nga bordi dhe t'i raportoje rregullisht atij.

• Ie plotesoje te gjitha proyedurat raportuese shtese te kerkuara nepermjet kontratave me donatoret dhe klientet.

• Te zhvilloje dhe drejtoje takime planifikimi dhe mbikq)'ljeje te rregullta me ekipin e menazhimit te stafit ekzekutiv.

• Te zgjidhe problemet eventuale te brendshme dhe te jashtme te organizates , si dhe ato qe mund t'i lindin asaj ne te ardhmen.

• Ie drejtoje te gjitha pergjegjesite ne perputhje me standartet nderkombetare te OJQ­ve dhe te siguroje pershtatjen e tyre ne te gjithe organizaten.

• Ie marre pjese ne aktivitetet e jashtme qe lidhen me, ose qe mbeshtesin organizaten.

• Ie marre pjese ne inisiativat e trajnimit, te shkembimit te brendshem te eksperiences dhe te aktiviteteve te yera profesionale te percaktuara ne strategjine e F ARZH-it.

• Ie zhvilloje, te zbatoje dhe te mbikqyre sisteme monitorimi te sigurimit te cilesise per te gjithe trajnimin dhe asistencen teknike te siguruar nga organizata.

• Ie aprovoje kontrata per shit jet dhe sherbimet te siguruara nga organizata, duke perfshire kontratat me klientet dhe donatoret, sikurse eshte percaktuar ne rregullat, politikat dhe procedurat e organizates.

• Ie ndermarre udhetime brenda dhe jashte shtetit, sikurse kerkohet per zbatimin e suksesshem te Strategjise se F ARZH-it.

• Ie kryeje te gjitha detyrat e tjera te nevojshme per zbatirnin e suksesshem te Strategjise se F ARZH-it dhe mireadministrimin e pergjithshem te organizates.

Aftesite dhe arsimimi

• Te kete diplome universitare. KryeIja e studimeve pas-universitare eshte nJe avantazh.

• Ie kete kryer kurse trajnimi qe lidhen me fushen e aktivitetit.

2

• Te kete njohuri mbi trajnimin nderkombetar, konsulencen, dhe standartet e prol(edurat e asistences teknike.

• Te kete pervoje pune me organizatat nderkombetare dhe donatoret e huaj.

• Te dije te perdore kompjuterin.

• Te zoteroje me te folur dhe te shkruar gjuhen angleze. Njohja e nje gjuhe te dyte eshte avantazh.

• Te kete aftesi dhe talent ne formim ekipi.

Raportimi dhe Llogaridhenia

• Drejtori Ekzekutiv raporton rregullisht dhe sipas kerkeses para bordit sikurse eshte percaktuar ne rregulloret dhe politikat e proyedures e organizates.

Atributet Specitlke

• Eksperience pune prej jo me pak se pese vjetesh.

• Eksperience ne rekrutimin, perzgjedhjen, dhe mbikqyrjen e stafit.

• Eksperience ne planifikimin dhe menaxhimin organizativ.

• Aftesi te percjelle misionin, qellimet, dhe rezultatet e organizates tek donatoret, media, komunitetin e OJQ-ve, biznesin, administraten publike, e~.

• Gadishmeri te punoje pa orar dhe nen presionin e kohes.

• Aftesi te punoje ne menyre te pavarur dhe ne ekip.

• Aftesi te punoje me OIQ-te.

• Gadishmeri te udhetoje shpesh.

• Te gezoje respektin e te rinjve dhe te interesuarve per organizaten.

• Aftesi te krijoje dhe mbaje marredhenje te mira me donatoret, OIQ-te, median, qeverine, dhe sektorin e biznesit.

• Aftesi te menaxhoje/zgjidhe konfliktet.

3

);?o

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

KONTRATA E DREJTORIT EKZEKUTIV TE FONDACIONIT AGJENSIA RAJONALE E ZHVILLIMIT-ELBASAN

Me date 1.10.1999

Adresa: Fondacioni Agjensia Rajonale e Zhvillimit-Elbasan Lagjja Hekurudha, Prane Pallatit 107 f4 Elbasan

Kjo leter perMn nje kontrate punesimi ndermjet Z. Naim Cope dhe Bordit Drejtues te F ARZH-Elbasan, perfaqesuar nga Kryetari i tij, Z. Xhema Vyshka.

Pozicioni:

I punesuari do te sherbeje ne pozicionin e Drejtorit Ekzekutiv per F ARZH-Elbasan .

Fusha e Aktivitetit :

Drejtori Ekzekutiv do te jete pergjegjes per menaxhimin dhe drejtimin e organizates dhe realizimin me sukses te nje strategjie te gjere per F ARZH-Elbasan.

Ky pozicion kerkon bashkepunim te ngushte dhe pergjegjesi te plote per udheheqjen dhe mbikqYI:ien e gjithe stafit te organizates.

Pergjegjesite Specifike do te perfshijne :

• Te zhvilloje dhe zbatoje saktesisht rregulloret, politikat dhe procedurat e organizates duke perfshire ato per financat, personelin, dhe rregullore te tjera operacionale

• Te zhvilloje dhe zbatoje sistemet operuese te organizates

• Te rekrutoje, punesoje dhe largoje nga puna stafin e organizates ne perputhje me politikat dhe procedurat e percaktuara

• Te mbikqyre stafin si dhe te realizoje vleresimin e punes se tij.

• Te identifikoje bashkepunimin me donatoret dhe prokuroje fondet e organizates nepermjet shkrirnit te propozimeve, fushatave te mbledhjes se fondeve, nderthwjes me donatoret, zhvillimin dhe zbatimin e aktiviteteve dhe sherbimeve qe gjenerojne te ardhura si dhe inisiativa te tjera.

• Te mbikqyre dhe raportoje mbi burimet financiare te organizates

/;'1

• Ie sherbeje si zedhenes dhe promovues i organizates; te vendose dhe forcoje marredheniet midis organizates dhe OJQ-ve te tjera, organizatave nderkombetare, agjensive qeveritare, medias, komunitetit te biznesit dhe publikut ne pergjithesi

• Ie zhviIIoje dhe vrojtoje realizimin e fushates se marredhenieve me pubJikun

• Ie zhviIIoje dhe zbatoje aktivitete per zhviIlimin e Bordit duke perfshire inisiativa per Komitetet e Bordit

• Ie ndjeke takimet e Bordit te Drejtoreve kur i kerkohet si dhe te raportoje rreguIlisht

• Ie pergatise raportet tremujore per te gjithe aktivitetet, yeshtjet financiare, progresin si dhe kufizimet ne Iidhje me mbarevajtjen e punes se organizates per periudhen raportuese.

• Ie siguroje

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

VLERESIMI I DREJTORIT EKZEKUTIV

Per seicieen nga foshat e meposhtme, beni nee vize vertikale leu mendoni se jeni

P = Pakiinaqshem, M = Mire, SH = Shkiilqyeshem

CILESIA E PUNES

A. Objektiva til matshme:

1. Zhvillimi i sistemeve te brendshme te operimit

p--------M--------SH

Verejtje:

2. Produktiviteti i punes

p--------M--------SH

Verejtje:

3. Sasia e sherbimeve te ofruara

p--------M--------SH

Verejtje:

B. Objektiva til tjera

1. Cilesia e sherbimeve

p--------M--------SH

verejtje:

/~

2. Puna ne grup

P --------M ---------SH

Verejtje:

INICIATIVA

1. Rritja e besimit publik, imazhit te organizates

P --------M --------SH

Verejtje:

PLANIFIKIMI DHE ORGANIZIMI

1. Aftesia per te planifikuar

P--------M --------SH

Verejtje:

2. Aftesia per te perdorur efektivisht burimet njerezore, materiale, kohen dhe pajisjet.

P--------M--------SH

Verejtje:

PERGJEGJESIA

Realizimi i pergjegjesive dhe detyrave

P --------M --------SH

Verejtje:

LLOGARIDHENIA

Llogaridhenia para bordit

Verejtje:

P --------M -------SH

BASHKEPUNlMI DHE FRYMA E GRUPIT

1. Aftesia per te punuar me bordin

P --------M --------SH

Verejtje:

2. Aftesia per te basbkepunuar me vartesit

P --------M --------SH

Verejtje:

KOMUNIKIMI

Aftesia per te transmetuar idete, me shkrim dhe me goje

P--------M--------SH

Verejtje:

NJOHJA E ARRITJEVE

Njohja e arritjeve tuaja dhe te tjereve

P--------M--------SH

Verejtje:

I~

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

PYETESOR PER VLERESIMIN E DREJTORIT EKZEKUTIV

1. Sa perputhen, sipas mendimit tuaj, objektivat tuaja personale me ato te organizates?

2. Ci1a eshte arritja juaj me e rendesishme gjate kesaj periudhe?

3. <;fare nuk keni arritur nga ajo qe prisnit?

4. Cili ka qene kontributi juaj per vendosjen e nje organizimi te brendshem te fuqishem per:

• Zhvillimin e sistemeve te brendshme te operimit • Rritjen e produktivitetit te punonjesve • Rritjen e moralit te punonjesve • Permiresimin e punes ne grup • Rritjen e ci1esise dhe sasise se sherbimeve.

5. Cili ka qene kontributijuaj per yurujen perpara te imazhit pub1ik te organizates?

6. Cili ka qene kontributi juaj per gjetjen e burimeve financiare?

8. <;fare aftesish dhe kontributi keni sjelle ne organizate? V1eresoni sa mire kryeni nga aktivitetet e meposhtme (vleresoni me 1 kur mendoni se e e kryeni me dobet dhe me 5 kur e beni me mire):

• Drejtimi i mbledhjeve • Takimet me individe dhe organizata te tjera • Komunikimi ne nivel individual • Komunikimi ne nivel grupi • Dhenia e instruksioneve per detyrat • Delegimi i pergjegjesise • Ndjekja e plotesimit te detyrave • Dhenia dhe manja e mendimit • Iukurajimi i vartesve

• Planifikimi i aktiviteteve • Manja e vendimeve vetem • Manja e vendimeve ne grup • Sbkrimi i raporteve • Mobilizimi i fondeve • Vendosja e prioriteteve, qellimeve, dhe objektivave • Menaxhimi i kohes • Zgjidhja e konflikteve • Zgjidhja e emergjencave • Bashkepunimi me te {jeret

10. Cilat nga aftesite e mesiperme i konsideroni me te rendesishmet per punen tuaj?

II. Cilat nga keto aftesi keni perdorur me teper gjate vitit te kaluar?

12. Cilat aftesi do te donit te permiresonit?

13. Si do t'i vleresonin vartesit tuaj kontributin dhe aftesite tuaja? Ajeni i kenaqur me vleresimin e tyre?

14. <;:fare marredhemesh keni krijuar me anetaret e bordit?

15. Si eshte realizuar llogaridhenia perpara bordit?

16. Cili ka qene kontributi juaj per fuqizimin e bordit?

17. A keni patur mbeshteqen e duhur nga bordi per permbushjen e punes tuaj?

18. Ne cilat drejtime do te deshironit mbeshteqe me te medha nga bordi per permbushjen e punes tuaj?

19. <;:fare do te ndryshonit ne kete organizate?

KOMENTE TE KRYETARJT TE BORDIT

KOMENTE TE DREJTQRJT EKZEKUTIY

/2--7

Objektiva

1.

2.

3.

4.

5.

PLAN! I VEPRIMEVE

Veprimet per Realizimin e Objektives Afati

VLERESIMI i DREJTORIT EKZEKUTN

Per seicieen nga fushat e meposhtme, beni nee vize vertikale ku mendoni se jent

P = Pakenaqshem, M = Mire, SH = Shkelqyeshem

CILESIA E PUNES

A. Objektiva te matshme:

I. Zhvillimi i sistemeve te brendshme te operimit

P --------M --------SH

Verejtje:

2. Produktiviteti i punes

P--------M --------SH

Verejtje:

3. Sasia e sherbimeve te ofruara

P--------M --------SH

Verejtje:

B. Objektiva te tjera

1. Cilesia e sherbimeve

P --------M --------SH

Verejtje:

2. Puna ne grup

P--------JVf---------~II

Verejtje:

INICIATIVA

1. Rritja e besimit publik, imazhit te organizates

P--------JVf--------~II

Verejtje:

PLANIFIKIMI DHE ORGANIZIMI

1. Aftesia per te planifikuar

P--------JVf--------~II

Verejtje:

2. Aftesia per te perdorur efektivisht burimet njerezore, rnateriale, kohen dhe pajisjet.

P --------JVf --------~II

Verejtje:

PERGJEGJE~IA

Realizimi i pergjegjesive dhe detyrave

P--------JVf--------~II

Verejtje:

LLOGARlDHENIA

Llogaridhenia para bordit

Verejtje:

P --------JVf --------~II

/2.f

BASBKEPUNIMI DBE FRYMA E GRUPIT

1. Afiesia per te punuar me hordin

p--------M--------SH

Verejtje:

2. Afiesia per te hashkepunuar me vartesit

p --------M --------SH

Verejtje:

KOMUNIKIMI

Aftesia per te transmetuar idete, me shkrim dhe me goje

P --------M --------SH

Verejtje:

NJOBJA E ARRITJEVE

Njohja e arritjeve tuaja dhe te tjereve

P --------M --------SH

Verejtje:

AGJENSIA RAJONALE E ZHVILLIMIT ELBASAN

RREGULLORJA E BRENDSHME E BORDIT Tit FONDACIONIT: AGJENSIA RAJONALE E ZHVILLIMIT ELBASAN (FARZH)

Qellimi i Rregullores se Brendshme:

RreguIlolja e brendeshme pennban rregullat e shkruara te rendesishme, qe sherbejne per drejtimin e F ARZH-it. Kjo rregullore e brendeshme mundeson Fondacionin:

• te marre vendime te reja • te perballoje sfida te reja • t'i pershtatet ndryshimeve te brendshme te organizates • te rregulloje menyren se si e realizon organizata misionin e saj • te siguroje drejtesine e vendimeve te bordit dhe mbrojuen kunder akuzave ligjore.

Rregullolja e brendshme mund te zgjerohet me amendamente te uera sipas nevojes, dhe layen tre funksione layesore:

Se pari, rregullolj a e brendshme percakton strukturen.

~ Detyrat e drejtuesve dhe anetareve te bordit, ~ Indentifikimin e komiteteve te perhershem te bordit, dhe ~ Menyren si zgjidhen anetaret e bordit).

Se dyti, rreguIlolja e brendshme percakton te drejtat e pjesemarresve ne strukture, sir,: jane te drejtat e anetareve qe te njoftohen per mbledhjet, te drejtat e anetareve te bordit ose drejtuesve qe u kerkohet te Jargohen nga kjo detyre

Se treti, rregullolja e brendshme percakton procedurat me anen e te cilave mund te ushtrohen te drejtat, fonnen e caktuar per njoftimet e mbledhjeve.

RREGULLORJA E BORDIT TE FARZH-ELBASAN

Nenil

1

Emri dhe VendndodJifa.

Organizata do te njihet emrin Fondacioni: Agjensia Rajona1e e Zhvillimit E1basan, e ne menyre te shkurtuar FARZH-E1basan. Zyra e FARZH-it do te jete ne qytetin e E1basanit, me adrese: Lagja Hekurudha, Prane Pal1atit 107/4, E1basan. Territori qe i eshte caktuar F ARZH -it per te vepruar perfshin rrethet e prefektures se E1basanit.

Neni2

Qiillimi i organizates.

Qellimi i F ARZH-it eshte mbeshtelja e zhvillimit te biznesit te vogel dhe te mesem, inkurajimi i iniciativave per zhvillimin ekonomiko-strategjik te rajonit, zgjerimi i bashkepunimit me donatoret dhe krijimi i partneritetit ndermjet pushtetit loka1 e qendror dhe subjekteve pub1ike e private.

FARZH-i eshte organizate pa qellim fitimi, dhe e ardhura neto e saj nuk shkon as teresisht dhe as pjeserisht ne interes te anetareve, punonjesve ose individeve te ljere. Ajo do til perdoret per zgjerimin e kapaciteteve funksionale te organizates. F ARZH-i nuk perfshihet ne veprimtari politike ne dobi te kandidateve te partive te ndryshme po1itike. Ofrimi i sherbimeve nga F ARZH-i eshte pjese e programit dhe misionit te tij.

Neni3

Mbledhja vjetore e organizates.

Mb1edhja vjetore e organizates duhet te mbahet brenda 60 ditesh nga data 1 janar e ydo viti, ne nje kohe dhe vend te percaktuar nga Bordi i Drejtoreve.

Neni4

Zyrtaret e Organizates.

Zyrtaret e organizates jane zyrtaret e Bordit te Drejtoreve pergjegjesite e te ci1eve jane permendur ne Nenin 5.

Neni5

Bordi i Drejtoreve.

Te gjitha prob1emet dhe yeshtjet e organizates duhet te drejtohen nga Bord i Drejtoreve te saj. Bordi i Drejtoreve duhet te perbehet te pakten nga 11 anetare te zgjedhur ne perputhje me dispozitat e parashikuar ne paragrafin 3 te ketij Neni. Bordi i Drejtoreve duhet te perbehet nga profesioniste dhe njohes te prob1emeve qe trajton organizata, perfaqesues te komuniteteve te ci1eve u sherbehet, eksperte financiare, juriste dhe perfaqesues te medias

2

dhe te pushtetit lokalv. Anetaret e bordit duhet te jene mbi 18 vjey dhe duhet te kene deshire qe te dedikojne kohe dhe perpjekje per te layer pergjegjesite ndaj organizates.

Kryesia e Bordit perbehet nga Kryetari dhe Sekretari i Bordit

Ne mbledhjen e zakonshme te Bordit te Drejtoreve qe i paraprin Mbledhjes Vjetore te organizates, Kryesia e Bordit duhet t'i paraqesin Bordit te Drejtoreve nje liste me emra per te mbushur vendet bosh te Bordit.

Perkohesisht, ne rast vendi bosh, Bordi i Drejtoreve mund te caktoje nje individ qe te layeje detyrat e zyrtarit apo drejtorit gjate periudhes se mungeses apo gjate kohes qe vendi eshte bosh.

<;:do anetar bordi me 3 ose me shume mungesa te njepasnjeshme pa ndonje aresye bindese mund te njoftohet nga Kryetari qe per aresye mungesash eshte shkarkuar nga detyra si anetar Bordi, dhe nje anetar i ri caktohet sipas parashikimeve te paragrafit 4 te ketij neni.

Quorumi. Mbledhjet mbahen kur me shume se 50% e anetareve te hordit jane te pranishem dhe procesi i votimit konsiderobet i vlefsbem me 50+1 vota te anetareve te bordit.

Neni6

Detyrat e Bordit tif Drejtoreve

Bordi i Drejtoreve eshte organ vendimor i organizates dhe ka per detyre te miratoje strategjine e organizates, tejape direktivat e pergjithshme te punes se saj, te kontrolloje dhe te mbikqyre organizaten, dhe te gjitha organizmat ndihmese te saj. Qe te ndihmohet ne administrimin e detyrave dhe pergjegjesive te veta, Bordi i Drejtoreve cakton Kryetarin e Bordit. Ne rast se sjellja e Kryetarit cenon misionin dhe etiken e organizates Kryetari mund te pezullohet deri ne perfundimin e hetimeve dhe marrjen e rekomandimeve nga ekspertet. Ne ~do rast kontrollin e drejteperdrejte mbi zgjedhjen dhe shkarkimin e Kryetarit e ka vetem Bordi i Drejtoreve te organizates.

Kryetari drejton ne menyre aktive aktivitetet dhe ~eshtjet e organizates sipas pershkrimit te pergjegjesive te pergatitura nga Bordi i Drejtoreve dhe layen detyra te tjera qe mund t'i caktoben here pas here nga Bordi.

Kryetari pergjigjet para Bordit te Drejtoreve dhe raporton rregullisbt para tij.

Bordi i Drejtoreve ka pushtet te siguroje adrninistrimin e drejte te donacioneve qe i jepen organizates, sipas kushteve dhe afateve, persa kohe qe keto kushte nuk jane ne kundershtim me qellimin e Organizates.

3

/33

Neni7

Mbledhjet e Bordit te Drejtoreve

Bordi i drejtoreve takohet nje here ne 2 muaj per yeshtje te zakonshme qe kane te bejne me aktivitetin e organizates. Rendi i dites se ketyre mbledhjeve percaktohet nga Kryetari por duhet te perfshije te pakten pikat e meposhteme:

a. Miratimin e shenimeve te mbledhjes se meparshme b. Raportet e Komisioneve te Bordit c. Raportin e Kryetarit te Bordit

Mbledhje te veyanta mund te mbahen me kerkesen e Kryetarit, ose te dy anetareve te bordit.

Njoftimet per mbledhje te rregullta behen me shkrim dhe anetaret e bordit njoftohen te pakten 5 dite perpara dates se mbledhjes.

Te gjitba mbledhjet e Bordit behen ne vendin dhe kohen e caktuar nga te pranishmit.

Njoftimet per mbledhjet ne te cilat planifikohen te behen ndryshime te Rregullores se Brendshme duhet te behen me shkrim 10 dite perpara mbledhjes. Asnje nga dispozitat e meposhteme nnk duhet te interpretohet si fakt qe pengon anetaret e Bordit te Drejtoreve te kundershtoje njoftimin apo te mos marre pjese ne mbledhje.

Ne qofte se nnk parashikohet ndryshe ne Statutin e organizates dhe ne kete Rregullore, te gjitba mbledhjet e Organizates, te Bordit te saj dhe te Komisioneve duhet te drejtohen sipas rregullave te zakonshme te mbledhjeve.

Neni8

Drejtuesit e Bordit te Drejtoreve

Drejtuesit e Bordit jane Kryetari dhe Sekretari.Bordi i Drejtoreve i zgjedh keta drejtues nga rradhet e anetareve te tij ne mbledhjen e zakonshme qe i paraprin Mbledhjes vjetore te organizates. Mbledhja e Bordit te Drejtoreve zgjedh kryetarin e bordit kur dy te tretat e anetareve jane te pranishem. Fituesi zgjidhet me votim Ie fshehte, me 2/3 e votave dhe kur kjo nnk arrihet procedura e votimit vazhdon.

Drejtuesit e Bordit te Drejtoreve zgjidhen per nje afat 2 vjetesh. Afati sherbimit te nje drejtuesi ne Bord filion diten e Mbledhjes Vjetore te organizates. Drejtuesit e Bordit nnk mund te zgjidhen per me shume se dy mandate rradhazi.

Kryetari i Bordit te Drejtoreve drejton te gjitha mbledhjet dhe kryen pergjegjesite e zakonshme te nje Kryetari Bordi (shih ne seksionin e Kryetarit te Bordit) si dhe detyra te

4

tjera qe mund t'i ngarkoje here pas here Bordi i Drejtoreve, te cilat nuk jane ne kundershtim me kompetencat dhe qellimet e kesaj organizate te percaktuara ne Statutin e saj.

Sekretari duhet te siguroje qe mbahet e gjithe korespondenca, dhe te Jayeje detyra te tjera te caktuara nga Bordi i Drejtoreve.

Til gjitha dokumentet duhet te mbahen per nje periudhe kohe qe perputhet me kerkesat profesionale, administrative dhe ligjore te rregullave dhe ligjeve ne fuqi te shtetit.

Neni9

Komitetet e Perhershiim dhe te Perkohshiim

Kryetari, sekretari, dhe personi qe merret me problemet financiare perbejne Komitetin Drejtues. Ky Komitet Drejtues takohet sipas udhezimeve te Bordit te Drejtoreve dhe merret me ato yeshtje qe i ngarkon Bordi i Drejtoreve.

Kryetari i Bordit te Drejtoreve krijon komitete te perhershem, cakton Jayetaret e tyre dhe percakton detyrat e komiteteve. Kryetaret e komiteteve te perhershem zgjidhen per nje afat I vjeyar, me te drejte rizgjedhjeje. Til gjitha komitetet mblidhen me kerkesen e Jayetareve te tyre. Komitetet e perhershem jane:

~ Komiteti i Organizim-Personelit dhe Vleresimit ~ Komiteti i Finance-Revizionimit dhe Sigurimit te Fondeve, ~ Komiteti i Marredhenieve Pub like, Programeve dhe Aktiviteteve.

Neni 10

Til gjithe anetaret e Bordit te Drejtoreve i sherbejne misionit te organizates ne menyre vullnetare dhe nuk shperblehen per kontributin ne kohe ose per punet qe vene ne dispozicion te organizates.

Nenill

Konjlikti i Interesave

Anetaret e Bordit te Drejtoreve nuk mund te angazhohen ne aktivitete apo transaksione qe kane konflikt material me detyrat dhe detyrimet e tyre ndaj organizates, per sa kohe qe jane ne kete detyre.

Drejtoret nuk duhet te Jayejne aktivitete private qe i vendosin ata ne pozita favorizuese si rezultat i marredhenies se tyre me Bordin e Drejtoreve te organizates.

5

<;do lloj dualiteti interesash apo konflikt per nje drejtor duhet bere e ditur anetareve te tjere te Bordit dhe duhet dokumentuar nepennjet nje pro<;edure \jetore te miratuar nga Bordi i Drejtoreve.

<;do drejtor qe ka nje konflikt interesash apo dualitet lidhur me nje <;eshge nuk duhet perfshire ne numrin votuesve ne mbledhje, edhe ne rast se lejohet me ligj. Shenimet e mbledhjes duhet te pasqyrojne deklaraten, abstenimin nga vota dhe gjendjen e quorumit.

Neni12

Amendamentet e Rregullores se Brendeshme

Amendamentet e propozuara i dorezohen me shkrim Kryetarit apo ndonje anetari te Bordit te Drejtoreve. Keto amendamente shpemdahen dhe lexohen ne dy mbledhje te njepasnjeshme te Bordit. Amendamentet e propozuara njoftohen me shkrim perpara sejciles mbledhje. Per aprovimin e ketyre amendamenteve kerkohet 2/3 e numrit te personave te pranishem. Nuk lejohet votimi me delegim.

Neni13

Shkrirja

ShkriIja e organizates ndodh kur perfundon misioni i saj, ose ne rastet kur me gjithe perpjekjet e mundeshme organizata nuk mund te zhvilloje normalisht aktivitetin e saj. Ne kete rast i lihet ne kompetence Bordit Drejtues dhe Drejtorit Egzekutiv per te vendosur mbi ecurine e metejshme.

NENETSHTESETERREGULLORESSEBRENDESHME

Neni9

Kontratat, (:eqet, Depozitat, dhe Revizioni Vjetor.

Kontratat. Bordi i Drejtoreve mund te autorizoje ndonje nga zyrtaret te lidhin kontrata apo te zbatojne dhe levrojne ndonje instrument ne emer dhe per llogari te organizates, dhe ky autoritet mund te jete i pergjithshem ose mund te kufizohet ne raste te ve<;anta.

<;eqet dhe Urdherpagesat. Te gjitha <;eqet, terheqjet e parave apo urdherpagesat, letrat me vlere apo deshmi te tjera detyrimesh te leshuara ne emer te organizates finnosen nga drejtuesit e Bordit te Drejtoreve apo Drejtorit Ekzekutiv me vendim te Bordit te Drejtoreve.

Dhurata. Bordi i Drejtoreve mund te pranoje per organizaten kontribute, dhurata, pajisje qe i sherbejne qellimit te pergjithshem apo ndonje qellimi specifik te organizates.

6

NenilO

Dokumentet dhe Regjistrat e Llogarise

Organizata mban libra dhe regjistra te rregullt lIogarie dhe shenime te mbledhjeve te anetareve te Bordit te Drejtoreve dhe komiteteve te Bordit, dhe duhet te mbaje ne zyren e organizates nje regjister me emrat dhe adresat e an15tareve me t15 drejt15 vote. Te gjitha dokumentet dhe regjistrat e organizates mund te inspektohen nga ¢o anetar i rregullt, sipas proyedurave te miratuara nga Bordi i Drej tor15ve.

7

/fi~

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

STRUKTURA ORGANIZATIVE E FONDACIONIT AGJENSIA RAJONALE E ZHVILLIMNIT­ELBASAN

BORDI DREJTUES

I I + ...

KOMlTETI I ORGANIZIM KOMITETI I KOMITETII PERSONELIT DHE I FINANCE REVIZIONIT DHE I MARREDHENIEVE

VLERESIMlT SIGURIMIT TE FONDEVE PUBLIKE, PROGRAMEVE DHE AKTIVITETEVE

... DREJTORI

EGZEKUTIV

AGJENSIA RAJONALE E ZHVILLIMIT - ELBA SAN

PERBERJA E ANETAREVE TE BORDIT TE FONDACIONIT: AGJENSIA RAJONALE E ZHVILLIMIT-ELBASAN

-

Emri Fushat Perfaqesia Shperndarja Pervoja I E Mosha

Organizates Ekspertizes Gjinore Gjeografike Organizative

Nga: Mosha mesa/are 38 viee Nga:

F ARZH-Elbasan 2 femra ( 18%) Elbasani 7 Persona 1 Person nga 18-30 vje9 Sektori i Biznesit 4 vete

9 mesbkuj (82%) Tirana 4 Persona 7 Person nga 30-45 vje9 Sektori i Ad. Publike 4 vete

3 Persona nga 45-60 vje9 Sektori i OJQ-ve 3 vete

/J.,?

AGJENSIA RAJONALE E ZHVILLIMIT - ELBASAN

PERSHKRIMI I POZICIONIT TE ANETAREVE T BORDIT

Permbledhje

Si anetar i Bordit te Drejtoreve te "Organizates" njoh pergjegjesine per te siguruar integritetin dhe qendrushrnerine finaneiare afat-gjate te organizates. Per te foreuar rritjen ne vijim dhe jeten e organizates pranoj qe shumellojshrneria e burimeve te te ardhurave eshte thelbesore dhe personalisht do te kontriboj me talentin dhe burimet e nevojshrne drejt ketij rezultati perfundimtar. Veyanerisht, pajtohem me keto:

Pergjegjesite e Pergjithshme

Per Sherbimet

• Te marr pjese dhe te jem teresisht i pergatitur per takimet e bordit qe mbahen dy here ne vit, si dhe per takimet e posayme.

• Te sherbej me deshire dhe entuziazem ne pozita udheheqesie dhe ne komitetet e eaktuara, kur kerkohet nje gje e tille.

• Te ruaj sensin e humorit.

• T'i bindem rregullave te dokumentaeionit qeverises dhe detyres per te qene 1

kujdesshem dhe i ndershem me organizaten.

• Te sherbej deri ne fund te mandatit tim, ose deri sa te zgjidhet dhe te kualifikohet nje pasardhes.

• (Te sherbej te pakten 18 muaj, me rizgjedhje ydo vit.)

Per Politikat

• Te marr pjese ne hartimin dhe pereaktimin e politikave neperrnjet te eilave kryhet puna e organizates.

1

• Ttl sugjeroj problemet e duhura ne rendin e dites per mbledbjet e bordit qe jane te lidbura me politikat dbe te pyes pyetjet e domosdoshme, nderkohe qe do te mbeshtes vendimet e shumices per yeshtjet e vendosura nga Bordi.

Per Planifikimin (yeshtjet strategjike)

• Ttl ndihmoj per sigurimin e nje planifikimi efektiv te organizates nepermjet shqyrtimit, kritikes dbe aprovimit te buxheteve vjetore dbe planeve te punes, si dbe planeve afat-gjata.

• Ttl kern njohurite e duhura per mjedisin global ne te cilin funksionon organizata jone.

• Ttl jap ndihmesen time ne interpretimin e komunitetit te cilit i sherbejme duke majtur fushen tone te interesit (te sjell pervojen time dbe kur duhet, te kerkoj keshille nga kontaktet qe kam)

• Te identifikoj kur ndryshojne interesat e anetareve dbe te siguroj investimet e tyre.

Per Financen

• Te ndihmoj ne sigurimin e integritetit dbe qendrushmerise financiare afat-gjate te organizates.

• Ttl pershtas shqyrtimin e buxhetit vjetor te ndare ne tremujore.

• Ttl siguroj qe kryhet revizionim periodik i financave.

• Te shoh dbe te kuptoj deklaratat financiare si dhe te jap ndihmesen time qe Bordi te permbushe pergjejgjesine e vet te besushmerise.

Per ZhviUimin (grumbullimin e fondeve, thithjen e burimeve - mund te jete kohe, donacione ne natyre, etj.)

• Te kontriboj per sigurimin e burimeve te pershtatshem qe permbushin me efektivitet nevojat aktuale dhe zgjidbjen financiare afat-gjate.

• Te kontriboj dbe te kultivoj burime te shumellojshme financimi dhe burime te tjera te nevojshme.

• Te kerkoj mundesi per veprimtari bashkepunuese me organizaten time, te cilat mund te gjenerojne burime.

2

14(

• Ie inkuraroj dhe te mbeshtes manaxhimin me qellim qe te kete risk te llogaritur dhe te ushtroj kontrollin e duhur kur investohen aktive ne hartimin e veprimtarive (te siguroj qe fondet e organizates jane te mbrojtura. Risku i kufizuar siguron sherbimin ne interes te klienteve ne te ardhmen).

• Te respektoj pergjegjesine qe kosto duhet te balancohet me perkushtimin afat-gjate ndaj perpjekjeve per te grumbulluar te ardhura (te pranoj qe eshte e domosdoshme te investohet ne qendrushmerine, dhe qe grumbullimi i fondeve dhe zhvillimi ka kosto te caktuar).

• Ie jap ndihmesen time ne perpjekjet per te identifikuar anetare te rinj dhe per te mbajtur anetaret aktuale qe paguajne.

• Te ndihmoj ne sigurimin e asistences financiare ne lidhje me personelin nepermjet gmmbullimit te fondeve nga individe te tjere, fondacione dhe korporata biznesi (per mbeshte~e financiare te drejtperdrejte dhe lloje te tjera ndihmese).

• Ie marr pjese aktive ne veprimtarite per gmmbullim fondesh qe ndermerr organizata dhe veprimtari te ngjasbme te aprovuara nga Bordi me synimin e permiresimit te imazhit dhe te te ardhurave.

Per Programet

• Te marr pjese ne percaktimin eprogrameve dhe sherbimeve prioritare te organizates dhe ne monitorimin e cilesise dhe efektivitetit te kostos se tyre.

• Ie kontriboj ne sigurimin qe programet dhe sherbimet e propozuara dhe aktuale jane ne perputhje me rnisionin, qellimet dhe mjetet financiare te organizates.

• Ie perqendrohem ne qellimin final te organizates.

• Ie inkurajoj pjesemanje ne programe dhe perdorim te sherbimeve.

• Ie percaktoj prioritetet ne program, te ofroj mbikqytje financiare dhe te siguroj qe burimet jane disponibel dhe trajtojne prioritetet e programit.

Per Vleresimin

• Ie marr pjese ne caktimin e Drejtorit Egzekutiv, mbeshte~en e punes se tij dhe monitorimin e saj.

• T'i ofroj keshilla Drejtorit Egzekutiv sa here shihet e domosdoshme.

3

• Te siguroj autorizim dhe rishikim qe fuqizon Drejtorin Egzekutiv ne udheheqesi kur eshte e nevojshme.

Per Integritetin

• Te ruaj pavaresine dhe objektivitetin dhe te sherbej me sens etik dhe integritet personal.

• Te shmang madje edhe shfaqjen e konfliktit te interesit qe mund te turperoje ose te shkaktoje detyrime ligjore per Bordin e organizates.

• Te zbuloj ne kohe s:do konflikt potencial te Bordit te Drejtoreve.

Per Rekrutimin

• Te sugjeroj kandidate te mundshem per Bordin ose organizaten te cilet jane individe me arritje te shquara dhe qe mund t'i sjellin punes se Bordit dhe organizates kontribut te rendesishem.

• Te sugjeroj kandidate te mundshem per pozicionet e anetareve te Bordit.

• Te marr pjese ne zgjedhjet e Bordit.

Per Vleresiminin e Punes se Bordit

• Te marr pjese ne vleresimet periodike te Bordit per punen e tij dhe te rekomandoj permiresime ne sf era te tilla si perberja, organizimi, kohe-zgjatja e sherbimit, marredheniet me personelin dhe pergjejgesite.

4

AGJENSIA RAJONALE E ZHVILLIMIT-ELBASAN

PLANI I REKRUTIMIT TE STAFIT TE FARZH-ELBASAN

NR. AKTIVITET PERSONI AFATIKOHOR PERGJEGJES

1. Takim me Drejtorin Ekzekutiv te F ARZH -it, per te diskutuar rreth G. Pasko, N. Cope 8 Tetor, 1999 procesit te rekrutimit te stafit te Fondacionit:Agjensia Rajoinale e Zhvillimit-Elbasan.

2. Percaktimi i vendeve vakante ne FARZH-Elbasan, per te cilet do te G. Pasko, N.Cope 8 Tetor, 1999 aplikohet me konkurim te hapur.

3. Caktimi i afatit t fundit per pranimin e aplikimeve G. Pasko, N. Cope 8 Tetor, 1999

4. Percaktimi i kritrev te vleresimit me pike, mbi bazen e tecileve do te G. Pasko, N. Cope 11 Tetor, 1999 vleresohen aplikantete

5. BeIja e njoftimeve ne gzetat dhe TV-ne loka per postet vakante tii N. Cope 11, 13, 15 Tetor 1999 FARZH-it

6. Pranimi i CV-ve dhe mbyllja e procesit te aplikimeve N. Cope 25 Tetor, 1999

7. Shqyrtimi i aplikimeve per perzgjedhjen kandidateve qe do te G. Pasko, N. Cope 26 Tetor, 1999 intervistohen

/~

8. Intervistirni i kandidateve G. Pasko; N. Cope, K. 27 Tetor 1999 Musha, Kr i Korn. Til Rekrutirnit

9. Intervistirni i dyte i kandidateve te rnundshern per tu zgj edhur ne G. Pasko, N. Cope 28 Tetor, 1999 postet vakante.

10. Shpallja e kandidateve fitues Nairn Cope 29 Tetor, .1999

11. Pergatitja dhe dergirni i letrave te falenderirnit per kandidatet qe N. Cope 29 Tetor, 1999 konkuruan per tu punesuar ne F ARZH-Elbasan

- - -----

1j{J-