Company Profile - Waves Qatar
-
Upload
khangminh22 -
Category
Documents
-
view
0 -
download
0
Transcript of Company Profile - Waves Qatar
Index
• History
• Our Values
• Vision & Mission
• Company Information
• Organization chart
• Our Divisions
• Our Services
• QCCI Membership Certificate
• Some of Our Projects
002
Waves has developed it’s divisions to provide our clients with exacting attention to details , the best selection of the highest quality products, uncompromising business ethics, and a commitment to remarkable design that enhances their lives .Our greatest privilege is to really understand and expertly interpret our clients wishes and have the opportunity to transform their lives through good design .
1. History
008
2. Our Values
We are determined to offer our customers the very best possible products ,processes , applications and services and this dedication to excellence embraces our four core values:
Creativity
Ambition
Flexibility
Honesty
009
• To be the best in our field : Experiences , Responsive , Competitive and on-schedule, bysetting a standard of excellence at all levels in our organization . To be innovative in ourapproach , follow principles of integrity and be a model of excellence .
• To be the vital link to our client : by adding value with efficient service and cost effectivesolutions for all our customers and suppliers . As we look to the future, we will continue thisendeavor by raising the standard of service excellence.
• For our customers : we will add value for our customers , by anticipating and identifyingtheir needs , promptly and competitively .To provide exceptional service that will meet orexceed customers expectations .
• For our Suppliers : we will be the channel of choice for our suppliers ,by providing effectiveways to bring their products , services and solutions to our mutual customers. To develop astrategic partnership with our suppliers to provide the best in product lines and servicesthat the industry can offer . To be actively involved in the communities we serve .
3. Vision & Mission
010
• Registered Name of Company
• Chairman
• Director
• General Manager
: Waves Trading & Contracting WLL
: Khalid Ahmed Fakhroo
: Mohammed Nabil
: Bilal Sami Al abdallah
• Registered Office address : P.O. Box 82431 6th Floor Bldg No. 24 Zone 26, Street #- 940,Al Najma Doha - Qatar
• Telephone
• E mail
• Website
• Banking Partner
: +974 4441 6319
: www.waves-qatar.com
: Al Ahli Bank
4. Company Information
011
ABOUT US
Educational and Industrial
Mr. Khalid Ahmed FakhrooChairman
Construction and Technology
• Waves Trading and Contracting, formerly known as Belhasa Projects
Qatar, is one of the group of Qatar companies consist of Al Huda
Engineering,ARCON, ALWataniya Company.
• Waves Trading and Contracting, a Qatari Company owned by
Mr. Khalid Ahmed Fakhroo, Mr. Mohammed Nabil & Mr. Bilal
Al Abdallah.
• Waves Trading and Contracting continues to expand in regional
and world markets, with substantial market shares in its chosed
product and service lines.
• The group has more than 5,000 employees and over 10 subsidiaries.
It is active in a number of overseas countries.
Trading
Investment & Real Estate, Hospitality, FM Marketing
services, Travel
012
THE GROUP WE BELONG
Mr. Mohammed Nabil Director
Educational and Industrial
Construction and Technology
Trading
Investment & Real Estate, Hospitality, FM Marketing
services, TravelMr. Bilal Al Abdallah General Manager
013
WHY WAVES TRADING AND CONTRACTING?
As part of the Group of Companies we access
General Trading
General Contracting
Infrastructure Real
Estate Vehicles
Crushers / Quarries
Specialized Projects
Unlimited Resources
Variety of resources
Financial Stability
Access to global trade
Local Government support
Buying power
Local funding
Global funding
Access to GCC
Uncomplicated service Best pricing
Total technical support Customer satisfaction Excellent Post‐sales
service
014
Organizational Chart
Sales Engineer
Sales Coordinator
Site Engineer
Planning Engineer
Estimator
Warehouse Keeper
Accountant
Store Keeper
SF / LS Supervisor
Office Boy
Mr. Khalid A Fakhroo
Chairman
General Foreman
MEP Foreman Maintenance Foreman
Steel Fixers
Carpenters
Mason
Plumber
Electrican
Plumber helper
Maint. Technician
Finishing Mason
Carpenters
Mason
Helper
Plumber Chargehand
Plumber
Plumber Helper
Electrical Chargehand
Electrician
QA/QC Engineer Camp CleanersWarehouse Helper
Drivers
Procurement Coordinators
Logistic & Camp Incharge
Landscape Manager
HSE Officer
Civil Engineer Mechanical Engineer Electrical Engineer CAD Draughtsman
Mr. Mohammed Nabil
Director
PRODivision Manager - SP &
WFProcurement Manager
Mr. Bilal Al Abdallah
General Manager
Landscpae ForemanSports Foreman
SF Chargehand
Sports Mason
Gardener
Irrigation Plumber
Maint. Technician
Helper
Office Admin
Asst./Receptionist
Accounting ManagerHR Coordinator / Secretary Operations Manager
CAD Draughtsman
Technical Engineer
CAD Draughtsman
Civil Foreman
Electrician Asst.
Civil Foreman MEP Foreman
Steel Fixers
015
THE BUSINESS UNITSAquascapes Maintenance
Watertec Equine
MEP Actioncrete
Sports and Coatings landscaping
Waves Trading
and
Contracting
017
AQUASCAPES
Design, supply and installation, renovation and maintenance of swimming pools and
water features
Any shape
Any size
Any budget
Water Facilities & Maintenance
018
ACTIONCRETE
Concrete repairs Ornate structures Composite piling / beach protection
works Basement pile / diaphragm wall
shotcreting Underground structures such as
lifting stations, underground tanks. Silicate injection against leakage in
concrete structures Small works Refurbishment of old structures Gunite / sprayed concrete to
mountain sides to prevent rock falland also provide beautification.
020
EQUINE
Whether it is an equine pool, underwater treadmill,
surfacing solutions for stables, camel pens, dog
kennels, dairies or design and construction of
riding arenas, all weather track surfaces or turf, we
have the capability to design and construct these
facilities incorporating the most innovative and
progressive designs that come to life with cutting
edge technology.
021
EQUINE
Seamless Rubber Flooring
for stables, kennels, camel
pens and other animal
housing
Equine, camel & race animal
Training Pools &
Hydrotherapy Pools
Race Rails
Paddock Fences
Arena Surfacing
Race Track Surfaces
Impact absorbing Wall Mats
for Stables
Rubber Pavers
Stables and Dairy Mats
Equine and Camel
Treadmills
Underwater Treadmills
Horse Walkers
Horse Weighbridges
Stable Doors & Windows
Stable Accessories
022
SPORTS & COATINGS
Decorative ( Residential/commercial ) Resin Flooring
Entrance lobby and reception areas
Main corridors
Board rooms
Waiting areas
Access to corporate / administration offices
Cafeteria
Library
Products being proposed Epoxy terrazzo
Polyurethane Art Floor
Areas
023
SPORTS & COATINGS
Plant rooms
Electric rooms
Mechanical labs
Electronic and robot labs
Storage areas
Electronic library
Utility rooms
Car park areas
Lift wells
Water tanks
Roof water proofing
Wet area waterproofing
Dust proofing
Functional ( Industrial) Resin FLooring
024
SPORTS & COATINGS
Multi-purpose indoor sports hall flooring
Athletic running tracks
Jogging tracks
Multi-purpose outdoor sports flooring
Tennis courts
Sports hall seating
Football / Rugby fields
Cricket pitches
Chain link fencing
Field lighting
Bicycle tracks
Field and track maintenance
Polyurethanes
Polyurethanes + Rubber
Acrylics
Artificial grass
Sports Flooring & Facilities
Systems
025
MEP
Design and execution of:
Electro-mechanical services
Electrical services
Mechanical services
Plumbing services
Specialized in:
Customized Water features
Themed Fountains
MEP
028
INFRASTRUCTURE
We design and supply the following products and systems.
• Drainage Networks and Pumping Stations
• Water Networks and Pumping Station
• District Cooling Piping Works, ETS and DCP
• Vacuum Sewerage System
• Sewage Treatment Plant
• Industrial Effluent Treatment Plant
• Air Odour Control System
• Substations and power transmission
• Operation and Maintenance Contract
SCOPE OF SERVICES
Engineering
Procurement
Construction
Operation Maintenance
Pumping Stations (Sewage /
Irrigation Water / Storm Water and its Rising Mains)
Sewage Treatment Plants
Industrial Effluent Treatment
Plants
Vacuum Sewerage and its Mains
Air Odor Control Systems
Seawater Intake and Outfall
District Cooling System
029
MAINTENANCE
Pool & Water feature maintenance
Landscape maintenance
Air Conditioning Service & Repair
Plumbing & Electrical Works
Service domestic hot and cold water lines
General Cleaning & Upkeep
Maintaining property assets and increasing their valueServices include total building technical management and scheduled maintenance to
comply with technical, health, environmental and other standards.
Helping keep costs downWe optimize energy spending and operating expenses, modernize facilities and align
services to each unit actual needs.
Full FM Services for Residentila and Commercial Properties
Ensuring comfort and safety
030
A) Infrastructure work:
Waves is a firm specialized in the execution of electro-mechanical works involved in Engineering , Procurement , Construction , Testing and commissioning of wet infrastructure projects such as sewage treatment plant along with utilities , pumping stations ,transmission mains pipelines , district cooling system , seawater intake and outfall as well as vacuum sewage in residential, public, and commercial buildings, as well as heavy electrical and mechanical works in industrial complexes and factories.
Throughout our experience in Qatar, we have executed an extremely wide variety of prestigious projects and consequently become one of the leading quality electromechanical contractors in the country.
We believe that customer satisfaction is achieved first, by carefully listening to our clients and studying their needs, second, by suggesting thoroughly studied solutions and agreeing on a plan, and finally, by executing the works in accordance with the set plan. Our commitment to customer satisfaction and quality is a continuous journey towards improving the performance of our staff and services and meeting whatever challenges that may confront us. We take great pride in what we have achieved.
7.OUR SERVICES
032
B) Swimming pool & Landscape :
Waves Trading and contracting W.L.L Created its Swimming pool Division to satisfy the needs
For high quality swimming pool construction and maintenance in Qatar.
Waves Trading and Contracting W.L.L builds ITS SWIMMING POOLS TO American and Europian standard using only the best quality American and European equipment.
As the leading swimming pool contractors in Qatar are able to design and construct to individual requirements and like wise are able to tailor maintenance programe to meet your specific requirements.
Waves Trading and Contracting W.L.L uses the shotcrete method of construction which was developed in the U.S.A. to give the best method of constructing swimming pools, SPA s, water tanks and domes. The system consists of shooting the concrete through a specially designed pump onto the pre-formed forming and steel reinforcement. Some of the main advantages of the shotcrete method are that the whole pool is shot in one operation without expansion joints and thus creating a guaranteed waterproof shell. It also allows for a variety of shapes to be obtained very quickly as it is possible to form the concrete shell within 10days of commencement.
Waves Trading and Contracting W.L.L finish its pools with acid resistant ceramic tiles and a precast concrete Californian coping.
033
D) General Contracting :
Clients can be assured of the quality and professionalism of Waves staff and its extensive in-house resources, tailored to the unique needs of each client and project. Waves offers a number of client services, each highly regarded within the industry.
Typically Waves services would fall into one or a combination of:
• Preconstruction Consulting
• Program Management
• Project Management
• Construction Management
• Design-Build
• General Construction
• Building Maintenance
• Multiple Building Program
034
E) Sports & Floor Covering :
• Construction
Waves provides a full design and build service for all new construction projects. From Contract Award to project hand-over we pay meticulous attention to detail and specification.
Waves director personally supervises construction from Day 1. Every phase is checked for conformance to the original requirements. Any unexpected developments are evaluated on site and problems solved with the minimum of fuss. Waves use the latest technology to ensure your court will be level and playable to championship standards. We use the finest materials and our skilled experienced workforce apply industry standard methods to all constructions.
• Design
Following our initial survey we draw up a detailed specification and scope of work covering the full construction and installation process. All enquiries, surveys, quotations and negotiations are handled by a company director ensuring that personal touch sometimes missing with larger organizations.
035
• Project Management
Immediately on Contract Award, men, materials and equipment will be allocated to your court. A schedule for completion is drawn up and agreed, and detailed site plans are created. Our policy is to start and finish all projects on the dates agreed with the minimum of fuss, and with no un-anticipated delays.
• Our Product line :
a) Tennis Court
b) Basketball Court, Badminton Court, Volleyball Court & Handball Court
c) Squash Court & Wooden Flooring
d) All Kind of Security Fencing
e) Running Tracks & Maintenance
f) White Line Marking
g) Wood flooring (sport , residential)
h) Artificial Grass
i) Vinyl flooring
j) Stadium Seating
036
Taxpayer's Name: WAVES TRADING & CONTRACTING
Address, P.O.Box: 82431 Doha
CR No: 44781
اسم المكلف: ويفز للتجارة والمقاوالت
تاريخ اإلصدار: 2020/02/09
.رقم السجل التجاري: 44781
العنوان، ص.ب: 82431 الدوحة
تاريخ اإلنتهاء: 2021/02/07
P.O. Box (28666) ص.ب - Fax (44461288)فاكس - Tel (44461444) تليفونwww.tasportal.mof.gov.qa الموقع االلكتروني [email protected] البريد االلكتروني
TIN: 000004011310742 الرقم الضريبي 000004011310742
09363383010113
Expiry Date: 07/02/2021
Issuing Date: 09/02/2020
Number of Branches: 0
Legal Form: Limited Liability Company الشكل القانوني: شركة ذات مسؤولية محدودة
تاريخ بدء النشاط: 2010/02/09
عدد الفروع: 0
Activity Commencing Date: 09/02/2010
مدير إدارة خدمات المكلفينTaxpayer Services Department
042
Salwa Beach Resort eyes Middle East’s premier destination glory
WAVES TRADING & CONTRACTING W.L.L
Salwa Beach Resort is set to become the Middle East’s premier destination beach resort, located on three million square metres of prime coastline in the southwest corner of Qatar, less than 100km
from Doha.With sweeping views of the Arabian Gulf, this
ambitious 362-key property will feature a wide range of remarkable facilities, including three kilometres of private beach, a luxury marina and yacht club, a themed water
park, a dive centre, cinemas, a shopping mall, an Arabian village, a 2,800 square metre spa and health club, and much more.
The sector of swimming pools & water features It takes up a large and important size of the project with a huge and complex amount of technical and aesthetic details to accomplish so all the eyes look for Who is the company that will accept this challenge and be able to complete the work of The swimming pools & water features with professionalism & within the required time period; Waves Trading & Contracting W.L.L. was accepting this challenge and The company made a great effort to be able to reach the remarkable achievement which everyone praised.
At the time that Waves Company congratulates Al-Ali Engineering Company for the impressive success in the
completion of this great and distinguished project, it also extends its thanks and gratitude to Al-Ali Engineering for giving it the opportunity to be part of this great success story and for its continuous support and facilities that it provided to complete the work on time.
The recent interaction with Waves Trading Chairman Khalid Fakhroo gave some insight into the very outstanding projects the company has implemented and how its ambitious business sets the tone for the future of water entertainment and luxury hospitality and for the preparation of the FIFA World Cup.
The largest number of pools of various sizes and types in one project in Qatar
Swimming pools & water features occupies a special place in Waves Trading’s history of delivering state-of-the-art tracks, even as the company has the expertise of
completing more than 500 pools & more than 400 water features in the region. Khalid Fakhroo takes pride in the fact that the company could accomplish the monumental task of completing 108 swimming pools with 100 water features on time. two of these pools was master pools and it’s the biggest pools in Qatar until now,
Some of the pools are made of fiberglass while others are made of reinforced concrete with amazing finishes.
The water features with the amazing under water lights made Life spawned at night, and let the place radiate with joy and happiness
Why Waves Trading & Contracting?
Waves Trading & Contracting W.L.L is a highly regarded Qatar company which has divisions specialized in Sports & Coating, Swimming pool & Leisure, Landscapes and Infrastructure development. It is known in the market for its excellence in handling all stages of water-related projects. From designing outdoor landscapes of all shapes and sizes, building the world’s largest aquarium (Commercial), to providing support and expertise to some of Qatari’s largest construction projects (Infrastructure), Waves’ experience and commitment to expansion knows no bounds.
Boasting more than 200 employees and over 5 subsidiaries, it is active in a number of countries in the region, including Kuwait and Oman. The company’s ability to execute projects in a timely manner as per client’s vision, at the same time ensuring global standards makes it appealing to all clients. Some of its top-notch clients and projects in Qatar include Aspire Zone, Ashghal, PEO, Barwa City real estate, Banana Island and Wakrah stadium.
065
ت��م��ك��ن��ت ش���رك���ة وي���ف���ز ل��ل��ت��ج��ارة
والمقاوالت من تحقيق إنجاز نوعي
ي��ض��اف إل���ى س��ل��س��ل��ة ن��ج��اح��ات��ه��ا في
ال��ق��ط��ري، تمثل ف��ي تصميم ال��س��وق
والنوافير السباحة حمامات وتنفيذ
ال���خ���اص���ة ب��م��ن��ت��ج��ع ش���اط���ئ س��ل��وى،
ب���ح���رف���ي���ة ع���ال���ي���ة وخ�������ال ال���ف���ت���رة
الزمنية المحددة.
وت����ع����ك����س ح����م����ام����ات ال���س���ب���اح���ة
والنوافير بالمنتجع، منظراً جمالياً
وع���ل���ى م���س���اح���ات ك���ب���ي���رة وم��ه��م��ة
م���ن ال���م���ش���روع، م��ت��م��ي��زة ب��ال��ع��دي��د
الفنية وال��ب��ص��م��ات ال��ت��ف��اص��ي��ل م���ن
والجمالية.
إنجاز نوعيوفي هذا السياق، قال السيد خالد
ويفز إدارة م��ج��ل��س رئ��ي��س ف��خ��رو
الشركة إن وال���م���ق���اوالت: ل��ل��ت��ج��ارة
ن����ف����ذت أك����ب����ر ع�����دد م����ن ال��م��س��اب��ح
ب��م��خ��ت��ل��ف األح����ج����ام واألن���������واع ف��ي
مشروع واحد في قطر، حيث تتميز
ح��م��ام��ات ال��س��ب��اح��ة وال��ن��واف��ي��ر في
العالية بالجودة ويفز شركة تاريخ
المتقن والتنفيذ التصميم، وجمال
وطرح األفكار الفريدة.
الشركة تمكنت ق��ائ��اً: وأض����اف
ال��م��ه��ام الضخمة أح���د إن���ج���از م���ن
ت��ن��ف��ي��ذ 108 ح��م��ام ف���ي ال��م��ت��م��ث��ل��ة
ال���ن���واف���ي���ر م����ن 100 م����ع س���ب���اح���ة
اثنان المحدد، الوقت المختلفة في
من هذه البرك كانت برك عماقة،
وه���ي أك��ب��ر ال��ب��رك ف��ي ق��ط��ر حتى
ام��ت��اك ذل����ك ف���ي وس���اه���م اآلن،
ال��ش��رك��ة خ��ب��رة ف��ي اس��ت��ك��م��ال أكثر
م���ن 400 م���ن 500 م��س��ب��ح وأك���ث���ر
نافورة في المنطقة.
وأش������ار إل����ى أن ب��ع��ض ح��م��ام��ات
ال���س���ب���اح���ة م���ص���ن���وع���ة م����ن األل���ي���اف
ال����زج����اج����ي����ة، ف���ي���م���ا ال���ب���ع���ض اآلخ����ر
م��ص��ن��وع م���ن ال���خ���رس���ان���ة ال��م��س��ل��ح��ة
نوافير وتتميز م��ذه��ل��ة، بتشطيبات
الماء تحت المذهلة ب��األض��واء المياه
لتضفي مزيداً من الحيوية في الليل،
وجعل المكان مشعاً بالفرح والسعادة.
وت��������ود ش����رك����ة وي����ف����ز ل���ل���ت���ج���ارة
امتنانها ع��ن تعبر أن وال��م��ق��اوالت،
وال��ت��ج��ارة للهندسة ال��ع��ل��ي ل��ش��رك��ة
والمقاوالت المحدودة على إتاحتها
لهذه الفرصة التي تكللت بإنجازها
المقاييس، بكل النوعي العمل ه��ذا
ل��ت��ك��ون ج������زًءا م���ن ق��ص��ة ال��ن��ج��اح،
والتسهيات المستمر دعمها وعلى
ال���ت���ي ق��دم��ت��ه��ا إلك���م���ال ال��ع��م��ل في
الوقت المحدد.
وجهة سياحية فريدةيعتبرمنتجع شاطئ سلوى وجهة
سياحية تقع على المنطقة الجنوبية
ال��غ��رب��ي��ة م���ن ق��ط��ر ع��ل��ى ب��ع��د أق��ل
مع ال��دوح��ة. كيلومتر من من 100
العربي، الخليج على شاملة إطالة
فإن هذا العقار الطموح المكون من
362 وحدة من المرافق الرائعة، بما
ثاثة بطول ذلك شاطئ خاص في
ك��ي��ل��وم��ت��رات، وم��رس��ى ف��اخ��ر ون���اٍد
مميزة، مائية وح��دي��ق��ة لليخوت،
للسينما، ودور ل��ل��غ��وص، وم���رك���ز
وم�����ول ل��ل��ت��س��وق، وق���ري���ة ع��رب��ي��ة،
ومنتجع صحي على مساحة 2,800
ون���اٍد صحي، وع��دد من متر مربع
المرافق.
الريادة في تنفيذ المشاريعشركة ويفز للتجارة والمقاوالت
ال��م��ش��اري��ع مختلف بتنفيذ ت��ت��م��ي��ز
تصميم من ب��دءاً بالمياه. المتعلقة
بجميع الخارجية الطبيعية المناظر
األش����ك����ال واألح�����ج�����ام، وب���ن���اء أك��ب��ر
، )ت��ج��اري( العالم ح��وض مائي في
وال��خ��ب��رة لبعض ال��دع��م إل��ى تقديم
)البنية البناء في قطر أكبر مشاريع
التحتية(.
مظلتها ت��ح��ت ال���ش���رك���ة وت���ض���م
أك��ث��ر م��ن 200 م��وظ��ف وأك��ث��ر من
ت��اب��ع��ة، وه��ي نشطة في 5 ش��رك��ات
ال��م��ن��ط��ق��ة، ب��م��ا في ع���دد م���ن دول
ذل�����ك ال���ك���وي���ت وع�����م�����ان. ق����درة
ال���ش���رك���ة ع��ل��ى ت��ن��ف��ي��ذ ال��م��ش��اري��ع
رؤية حسب المناسب الوقت في
العميل، وفي نفس الوقت ضمان
جذابة يجعلها العالمية المعايير
ل��ج��م��ي��ع ال��ع��م��اء، ك��م��ا أن خ��ب��رة
ويفز والتزامها بالتوسع ال يعرف
مشاريع الشركة ونفذت ح��دوًدا.
ب��ارزة في قطر منها في أسباير
،»PEO«و ، وأش�����غ�����ال زون،
ومدينة بروة العقارية، وجزيرة
البانانا واستاد الوكرة.
»ويفز للتجارة والمقاوالت« تكمل تجهيز حمامات السباحة والنوافير بمنتجع شاطئ سلوىبحرفية عالية وخالل الفترة الزمنية المحددة
تنفيذ حمامات سباحة مصنوعة من األلياف الزجاجية والخرسانة المسلحة نوافي��ر المي��اه تتميز باألضواء المش��عة لتضف��ي مزيداً من الحيوي��ة في الليل
خالد فخرو: عملنا
يتميز بالجودة العالية وجمال
التصميم والتنفيذ المتقن
تنفيذ 108
حمام سباحة
و100 نافورة
مائية وبركتين
عمالقتين
066
New Rekortan tracks were installed in record time to help athletes prepare for the 2019 IAAF World Athletic Championships
QATAR SPORTS CLUBThe Qatar Sports Club’s new Rekortan tracks (main stadium track and warm up track) have just been completed. The installation was done by Polytan Agent Bilal Al Abdallah, of Waves Trading & Contracting W.L.L, an experienced firm who have completed more than 20 tracks in the region in recent years.
IAAF CLASS 1 CERTIFICATIONThe Qatar Sports Club was previously a Rekortan track and has been the home of the Diamond League in Doha since 2010.
With the new stadium track already approved by IAAF as CLASS 1 the venue is ready for elite competition.
This year’s Diamond League moved to the Khalifa International Stadium, the venue for the 2019 IAAF World Championships. It is thought the Diamond League event will return to the Qatar Sports Club and the new track in 2020.
POLYTAN PROVIDER OF REKORTAN’S NEW CLASS 1 TRACK IN QATAR
REKORTANThe tracks are both Rekortan PUR 15mm systems.
This high-speed synthetic surface is designed for top performance. Thanks to the combination of an elastic base layer and a solid structure, Rekortan PUR running track surfaces provide optimum conditions for professional athletes ensuring maximum acceleration and fantastic shock absorption values.
The EPDM granules dispersed in the top layer make the sports surface ideal for running shoes with spikes and offer extremely high acceleration. Energy-enhancing tread elasticity and high abrasion resistance complete the properties of this elite surface.
ATHLETE AND ENVIRONMENTAL WELFAREThe Rekortan range has systems for all facilities and needs, including Gel tracks, a new track category, which features our unique green layer based on 70% renewable polyurethane. This results in a total of 88% renewable/recyclable content.
With the new stadium track already approved by IAAF as CLASS 1 the venue is ready for elite competition.
GOLDEN TIMES. GLITTERING FUTURE.Polytan is a member of Sport Group which has the most IAAF Certified facilities globally and 2019 is the 50th anniversary of Rekortan, our legendary track brand. This legacy of golden times continues in 2019, with 11 World Leading times and 15 National Records set on our Diamond League tracks this year.
Rekortan is supplied by Sport Group’s companies Polytan in EMEA and Asia Pacific, APT in North America and Asia Pacific and AstroTurf in North America.
Rekortan. Our experience is golden. Our future is glittering.
067
OVERALL:
Venue: Qatar Sport Club
Location: Doha, Qatar
Project: Replace stadium track and warm up track.
Agent: Waves Trading & Contracting W.L.L
Track system: Rekortan PUR 15mm, supplied by Polytan
Certification: IAAF Class 1
TIMING: Job was completed in record time to be ready for the IAAF World Championships (to serve as training tracks)
• Completed in 2.5 months (would normally be a 6 month project)
• 120 people on site working 24 hours a day.
SCOPE OF WORK:
Track installation:
• Excavated both running tracks, to a depth of 1m and removed all the backfilling material
• Filled and compacted
• Asphalt layer
• Installed Rekortan PUR 15 mm track system.
Drainage:
• Installed drainage system including Hauraton channel
• Drainage under all athletic areas eg. throwing areas.
Athletic equipment installation:
• Installation of throwing circles, pole vault tray, water jump hurdle, long jump and triple jump trays.
Aluminium rail:
• Supply and installation (between grass and track)
• Restoring of natural grass
• Excavate and back fill with agricultural soil
• Replace the natural grass for football field areas, both tacks.
SCOPE OF WORK - DETAILS
068
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
QASCO QASCO REPAIR AND WATERPROOFING WORKS AT TUNNELS 4,579,000.00 1986 QATAR
PETROSERV LTD QATAR UNIVERSITY QATAR UNIVERSITYCOMPLETE STRUCTURAL REFURBISHMENT OF THE UNDERGROUND
SERVICE TUNNELS INCLUDING INFECTION PUMPING THROUGH TUNNEL STRUCTURE TO STABILISE SURROUNDING GROUND.
987,750.00 1994 QATAR
PETROSERV LTD – QASCO PLANT QASCOCOMPLETE STRUCTURAL REFURBISHMENT OF THE UNDERGROUND
SERVICE TUNNELS INCLUDING INFECTION PUMPING THROUGH TUNNEL STRUCTURE TO STABILISE SURROUNDING GROUND.
4,000,000.00 1997 QATAR
PETROSERV LTD – QATAR QASCO REPAIR & RENOVATION OF ELECTRICAL MANHOLES FOR QASCO 4,000,000.00 1998 QATAR
QATAR INTERNATIONAL TRADING QATAR INTERNATIONAL TRADING SWIMMING POOL AND COURT WORKS. 1,713,600.00 2001 QATAR
PUBLIC WORKS AUTHORITY - ASHGHAL ASHGHAL DAY SRP 1200M3 & PUMPING STATION FOR BARWA AL BARAHA PHASE 1 AT DOHA INDUSTRIAL AREA ZONE 52 64,000,000.00 2007 QATAR
PUBLIC WORKS AUTHORITY - ASHGHAL ASHGHAL LIFTING STATIONS 2 NOS., IRRIGATION PUMPING STATIONS & 1500M3 DAY STP (WEST SALIYA & SOUTH OF DOHA CITY) 37,000,000.00 2007 QATAR
EDAW AECON QATAR UNIVERSITY DESING CONSULTANCY SERVICE TO WATER FEATURES AT EDUCATION CITY. 36,000.00 2008 QATAR
PUBLIC WORKS AUTHORITY - ASHGHAL ASHGHAL DESIGN & CONSTRUCTION OF AL BARAHA STW TANKERS RECEPTION AND TSE INJECTION FACILITY 11,868,990.00 2010 QATAR
REDCO INTERNATIONAL WLL BURJ MARINA REAL ESTATE CO
EXECUTION OF LANDSCAPE WORKS AT BURJ MARINA BUILDING AT LUSAIL, QATAR. 7,800,000.00 2012 QATAR
GROUP 3 TRADING & CONTRACTING CO.WLL
BARWA AL SHAMAL REAL ESTATE COMPANY
SUPPLY AND INSTALLATION OF INTERLOCK / KERBS & ASPHALT WORK -MACE 665,000.00 2012 QATAR
REDCO INTERNATIONAL WLL QATAR AIRWAYS SUPPLY & INSTALLATION OF EIFS AT QATAR AIRWAYS CREW ACCOMMODATION. 6,700,000.00 2012 QATAR
DRAGONI INTERNATIONAL LLC MURWAB HOTEL SUPPLY & INSTALLATION OF SUANA & STEAM ROOMS 566,745.00 2012 QATAR
RAMCO TRADING & CONTRACTING WLL SHEIKH.GHANIM AL THANI SUPPLY AND APPLY OF EPOXY WORKS 424,030.00 2012 QATAR
Page 1 of 13
070
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
AL MAHER CONSTRUCTION LLC SHEIKH HAMAD BIN ALI AL ATIYAH
SUPPLY & INSTALLATION OF SWIMMING POOL, JACUZZI, PLUNGE POOL, SAUNA & STEAM ROOM FOR HEALTH CLUB AT SAILIYA 389,172.00 2012 QATAR
HE.HAMAD BIN ALI AL ATTIYAH HE.HAMAD BIN ALI AL ATTIYAH
CONSTRUCTION OF PLUNGE POOL, JACUZZI, SAUNA AND STEAM ROOM AT MR.HAMAD BIN ALI AL ATTIYAH VILLA 382,000.00 2012 QATAR
AL-SULAITI SONS CO. WLL TRADING & CONTRACTING
MR.ABDULLAH MUBARAK AL SULAITI
CONSTRUCTION OF SWIMMING POOL, JACUZZI & WATER FEATURE FOR MR.ABDULLAH MUBARAK AL SULAITI VILLA AT DOHA QATAR 346,517.00 2012 QATAR
LYCEE FRANCO QATARIEN VOLTAIRE PVT CLIENT SUPPLY OF GARDEN BENCHES 32,500.00 2012 QATAR
KHALID CORPORATION WLL SHEIKH KHALID AL THANI SW IMMING POOL & JACUZZI WORKS AT SHK. KHALID PALACE 306,000.00 2012 QATAR
URBACON GENERAL CONTRACTING PEODESIGN,CONSTRUCT,SUPPLY, INSTALLATION, TEST ING &
COMMISSIONING OF SWIMMING POOL STRUCTUR ES INCLUDING CIVIL WORKS AT BANANA ISLAND RESORT
3,863,135.00 2012 QATAR
BROOKFIELD MULTIPLEX MEDGULF WLLNEW DOHA
INTERNATIONAL AIRPORT
LANDSCAPE & IRRIGATION WORKS AT NDIA 7201 - CONSOLIDATED RENTAL CAR FACILITY & MIDFEILD TUNNEL IMPROVEMENTS 2,659,186.00 2012 QATAR
ASGHAL – PUBLIC WORKS AUTHORITY ASHGHAL EXECUTION OF POW ER STATION AT AL BARAHA SEWERAGE TREATMENT PLANT. 2,074,589.00 2012 QATAR
ROOTS QATAR WLL QAPCO SUPPLY & INSTALLATION OF FOUNTAIN IN MESAIEED (QAPCO COMPLEX) 179,850.00 2012 QATAR
ALNA SARIYA PRIVATE VILLA AL SARIYA SUPPLY AND INSTALLATION OF SAUNA AT ALNA SARIYA PRIVATE VILLA 16,195.00 2012 QATAR
ACS SCHOOL DOHA INTERNATIONAL SCHOOL LLC.
ACS SCHOOL DOHA INTERNATIONAL
SCHOOL LLC.SUPPLY AND INSTALLTION OF INDOOR RUBBER FLOORING WORKS. 150,488.00 2012 QATAR
BUILDING ENGINEERING BUREAU SHEIKH NASSER MOHAMMED AL THANI
SUPPLY & INSTALLATION OF JACUZZIOF PRIVATE VILLA OF SHEIKH NASSER MOHAMMED AL THANI 137,000.00 2012 QATAR
AL HABTOOR ENGINEERING ENTERPRISES QATAR W LL.
AL RAYYAN TOURISM & INVESTMENT
CONSTRUCTION OF HYDROTONIC POOL WORKS AT DOHA CITY CENTER EXPANSION PHASE IIIA (EAST) CORE & SHELL, DOHA, QATAR. 1,670,315.00 2012 QATAR
COMPASS INTERNATIONAL SCHOOLSCOMPASS
INTERNATIONAL SCHOOLS
CONSTRUCTION OF SWIMMING POOL & POOL SHADE AT COMPASS INTERNATIONAL SCHOOL MADINAT KHALIFA BRANCH 1,339,542.00 2012 QATAR
Page 2 of 13
071
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
SHAPOORJI PALLONJI QATAR W LL BARWA CITY REAL ESTATE CO
SUPPLY AND INSTALLATION OF STREET FURNITURE W ORKS AT BARWA CITY AMENITIES ZONE 1,127,778.87 2012 QATAR
CASAIS QATARSHK.ABDUL AZIZ BIN
HAMAD BIN JASSIM AL THANI
SUPPLY & INSTALLATION OF SWIMMING POOL, JACUZZI, STEAM ROOM, & HAMMAM ROOM 1,016,942.00 2012 QATAR
ARABIAN MEP CONTRACTING CENTRO HOTEL SWIMMING POOL MEP WORK AT CENTRO HOTEL DOHA -1683 94,000.00 2013 QATAR
SATAL QATAR CONTRACTING CENTRO HOT EL SUPPLY & INSTALLATION OF EIFS AT CENTRO HOT EL 794,008.00 2013 QATAR
AL AJAJ TRADING & CONTRACTING INTERCONTINENTEL RESIDENT SUITS EXTERNAL LANDSCAPE DESIGN & BUILDING WORKS 614,125.00 2013 QATAR
AL BAIDA TECHNICAL SERVICES HEJEN COMMITTEE SUPPLY & PLANTING OF SOFTLANDSCAPING WORK AT SHAHANIYA CAMEL RACE COURSE 609,320.00 2013 QATAR
SINOHYDRO GROUP LTD. KAHRAMAA BARWA AL BARAHA PROJECT PHASE 2 6,537,288.00 2013 QATAR
ANDROID TRADING & CONTRACTING MR.KHALID MAHMOUD SUPPLY & INSTALLATION OF THERAPY EQUIPMENT & CHILLER UNIT 478,375.00 2013 QATAR
AL JAZEERA ROYAL SPORTS SUMMIT ACADEMY SUMMIT ACADEMY SPORTS FLOORING 44,079.00 2013 QATAR
URBACON GENERAL CONTRACTING SHEIKH HASSAN ABDULLAH M AL THANI SWIMMING POOL WORK AT UNION RESIDENTIAL TOWER 436,927.00 2013 QATAR
SHELTER QATAR WLL PVT CLIENTS CONSTRUCTION OF SWIMMING POOLS LPC19, 45,46, & LPE 11 AT THE PEARL VILLA POOL PROJECT 373,541.00 2013 QATAR
BELHASA PROJECTS QATAR LLC MR.KHALID MAHMOUD LANDSCAPE DESIGN FOR PRIVATE VILLA – B5 28,000.00 2013 QATAR
AL MADAR CONTRACTING WLL. AL AIYA LANDSCAPE & IRRIGATION WORK AT PROPOSED JUMA MASJID & SPORTS FACILITIES AT DUKHAN 220,000.00 2013 QATAR
SATAL CONTRACTING WLL CENTRO HOTEL AL MANNAI RESIDENTIAL COMPOUND AT UMM SALAL 148,600.00 2013 QATAR
Page 3 of 13
072
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
AL MADAR CONTRACTING WLL. AL AIYA LANDSCAPE & IRRIGATION WORK AT HEALTH CENTER & LAUNDRY BLOCK I N MIC LABOR ACCOMMODATION SITE 146 125,000.00 2013 QATAR
KITTCO CONTRACTING MR.JABER BIN SULTAN AL KUWARY
CONCEPT & DETAIL DESIGN SERVICE OF LANDSCAPE WORK AT TAWAR MALL 100,000.00 2013 QATAR
HASSANESCO TRADING & CONTRACTING WLL
MINISTRY OF INTERIOR (MOI) SPORTS FLOORING WORKS FOR POLICE TRAINI NG INSTITUTE 1,260,650.00 2013 QATAR
NATIONAL INDUSTRIAL CONTRACTING COMPANY AL AIYA
SUPPLY AND INSTALLATION LANDSCAPING WORK AT CONSTRUCTION COMPLETION MAINTENANCE OF LABOR ACCOMMODATION AT WEST SIDE
WITHIN RAS LAFFAN IND.CITY 830,000.00 2014 QATAR
GREATER DOHA TRADING AND CONTRACTING PVT CLIENT CONSTRUCTION OF SWIMMING POOL AT AL WAKRA 68,000.00 2014 QATAR
M/s.JORDANIAN SCHOOL JORDANIAN SCHOOL SUPPLY & INSTALLATION OF POLYTAN SPORTS SURFACE SYSTEM WITH SURFACE GRINDING WORK AT JORDANIAN 62,000.00 2014 QATAR
HASSANESCO TRADING & CONTRACTING WLL. QATAR ARMED FORCES SUPPLY AND INSTALLATION OF INDOOR SPORTS FLOORING WORK
GENERAL GUARDS DEPARTMENT AT SALWA 57,100.00 2014 QATAR
AL MADAR CONTRACTING WLL. AL AIYA SUPPLY & INSTALLATION OF WATER FOUNTAIN WORK AT JUMA MASJID AT SIDRA GARDEN &SPORTS FACILITIES AT 160,000.00 2014 QATAR
INTERNATIONAL TRADING & CONTRACTING
MR.HUSSAM ABDUL SALAM ISSA
SUPPLY & INSTALLATION OF SQUASH COURT AT 36 VILLA AND CLUBHOUSE FOR HUSSAM ABDUL SALAM ISSA AT UMM SALAL 120,409.00 2014 QATAR
PRIVATE VILLA OF MR.ANBAR MUBARAK ANBAR ALI
MR.ANBAR MUBARAK AL ALI
CONSTRUCTION OF SKIMMER SYSTEM SWIMMING POOL AT PRIVATE VILLA 110,000.00 2014 QATAR
COMBINED GROUP CO. FOR TRADING & CONTRACTING W.L.L QATAR UNIVERSITY
SUPPLY, INSTALLATION & MAINTENANCE SWIMMING POOL & WATER FEATURE (MEP) WORKS AT CONSTRUCTION OF ARAB CENTER FOR
RESEARCH & POLICY STUDIES. 1,779,731.00 2014 QATAR
SOUTH TRADING & CONTRACTING MR. ABDULLAH AL KUWARI
CONSTRUCTION OF SWIMMING POOL W ORKS AT PRIVATE VILLA OF MR. ABDULLAH AL KUWARI 90,000.00 2014 QATAR
HAMAD & MOHAMAD AL FUTTAIM LLC QATAR UNIVERSITY SWIMMING POOL MAINTENANCE W ORK AT QATAR UNIVERSITY 700,000.00 2014 QATAR
CONTRACO W LL EXAS A & M UNIVERSITY SUPPLY AND INSTALLATION EXTERIOR INSULTATION SYSTEM (EIFS) WORK AT TEXAS A & M UNIVERSITY 634,500.00 2014 QATAR
Page 4 of 13
073
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
SHARAKA HOLDINGS SHARAKA HOLDINGS CONSTRUCTION OF SWIMMING POOL KIDS POOL JACUZZI , SAUNA AND STEAM ROOM FOR RESIDENTIAL 450,000.00 2014 QATAR
QATAR POWER CONSTRUCTION DOHA ACADEMY SUPPLY & INSTALLATION OF SPORTS FLOORING WORK AT DOHA ACADEMY 400,000.00 2014 QATAR
SOLUTION FOR HEALTHCARE AND MEDICAL SERVICES W.L.L. SHK.KHALIFA AL THANI CONSTRUCTION OF CAMEL POOL OF PROPOSED CAMEL POOL & OUTSIDE
FACILITIES AT AL THARB 4,180,000.00 2014 QATAR
LOTUS TRADING & CONTRACTING ASHGHAL SUPPLY & INSTALLATION OF SPORTS EQUIPMENT FOR CONSTRUCTION OF FOUR (4) NEW SCHOOLS PROJECT 317,274.00 2014 QATAR
ASPIRE LOGISTICS ASPIRE LOGISTICS PVC SPORTS FLOORING FOR INDOOR TENNIS COURT AT LADIES CLUB ASPIRE ZONE 263,542.00 2014 QATAR
QATAR ARMED FORCES QATAR ARMED FORCES SPORTS FLOORING WORK FOR MILITATY SPORTS HALL AT SUHAILIYAT CAMP 219,723.00 2014 QATAR
ABANTIA TEMPO PEOD PLOT NO 54604008 AL RAYYAN (25 VILLA WATERPROOFING,MEP AND
FINISHES WORKS TO SP, SPA AND SAUNA AT VILLA # 2 (SULTAN VILLA)WEST BAY,
184,200.00 2014 QATAR
MR.ABDUL RAHMAN FAKRO MR.ABDUL RAHMAN FAKRO VILLA CONSTRUCTION OF SWIMMING POOL AT MR.ABDUL RAHMAN FAKRO VILLA 140,000.00 2014 QATAR
QATAR COOL QATAR COOL WEST BAY – DISTRICT COOLING PLANT -1 , RESTORING COOLING CAPACITY (PROPOSAL # 1) 12,542,000.00 2014 QATAR
MR.ABDUL HAKEEM MR.ABDUL HAKEEM CONSTRUCTION OF SWIMMING POOL AT MR.ABDUL HAKEEM VILLA 115,860.00 2014 QATAR
CARILLION QATAR MSHEREIB PROPERTIES TILE FIXING W ORK AT MSHEIREB DOW N TOW N DOHA PHASE -1B 1,999,208.00 2014 QATAR
LOTUS TRADING & CONTRACTING ASHGHAL SUPPLY & INSTALLATION OF SPORTS FLOORING FOR CONSTRUCTION OF FOUR (4) NEW SCHOOLS PROJECT 1,523,880.00 2014 QATAR
QATAR COOL QATAR COOL DOHA QATAR PDN MODIFICATION AT WEST BAY 1,250,000.00 2014 QATAR
WA.PECKTEL ELECTROMECHANICAL CONTRACTING CO. SHK.MOHD AL THANI SWIMMING POOL & WATER FEATURE (MEP+CIVIL) WORK AT AL WAJBA 4
PALACES (1B+G+M+1) PROJECTS 725,000.00 2015 QATAR
Page 5 of 13
074
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
MR.JASSIM MOHAMMED AL MOHAMMED MR.JASSIM MOHAMMED AL MOHAMMED . CONSTRUCTION OF SWIMMING POOL WORK AT PRIVATE VILLA 65,000.00 2015 QATAR
TARGET ENGINEERING CONSTRUCTION CO. QATAR PETROLEUM
SUPPLY AND INSTALLATION OF SOF LANDSCAPING & IRRIGATION WORK AT NEW TELECOM SECURITY BLDG AND EXTENSION ROAD IN HALUL
ISLAND 619,162.00 2015 QATAR
W.A.PECKTAL ELECTRO MECHANICAL CONTRACTING CO. PVT CLIENT SWIMMING POOL (MEP+FINISHING) WORK AT PROJECT B+G+3
RESIDENTIAL BUILDING AT AL SADD. 60,000.00 2015 QATAR
COMBINED GROUP OF COMPANIES. PUBLIC ENGINEERING OFFICE
CONSTRUCTION OF WATER FEATURE WORK AT WEDDING HALL COMPLEX AT AL DAAYEN 450,000.00 2015 QATAR
AL ALI ENGINEERING CO W.L.L PRIVATE ENGINEERING OFFICE (PEO)
SUPPLY AND INSTALLATION OF SWIMMING POOL AND WATER FEATURE WORK AT SALWA BEACH RESORT PROJECT 40,000,000.00 2015 QATAR
HAMAD & MOHAMAD AL -FUTTAIM CO.LLC QATAR UNIVERSITY SWIMMING POOL MAINTENANCE AT QATAR UNIVERSITY 38,000.00 2015 QATAR
AL JABER TRADING & CONT. CO W.L.L (JTC) MOYS SUPPLY OF SAND MIX MATERIALS FOR THE PROJECT OF CONSTRUCTION
OF HORSE OWNERS COMPLEX AT AL KHOR PHASE-2 12,594,094.00 2015 QATAR.
HAMTON INTERNATIONAL W.L.L SHK. KHALIFA AL THANI SUPPLY & INSTALLATION OF SWIMMING POOL WORK AT CONSTRUCTION OF 33 VILLA COMPOUND AT AIN KHALID. 115,713.00 2015 QATAR
AL HUDA ENGINEERING WORKS ASHGHAL SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS SURFACES &
EQUIPMENT WORK. CONSTRUCTION OF (3) NEW SCHOOLS AROUND DOHA & VILLAGES-PACKAGE 03 STAGE 09.
1,477,074.00 2015 QATAR
AL JABER TRADING & CONT. CO W.L.L ASHGHAL SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS SURFACES &
EQUIPMENT WORK. CONSTRUCTION OF (3) NEW SCHOOLS AROUND DOHA & VILLAGES -PACKAGE 06
1,394,000.00 2015 QATAR
AL KHAYYAT CONTRACTING & TRADING KCT SUPPLY & INSTALLATION OF WATER FEATURE MEP WORK AT AL KHAYYAT PVT VILLA 41,000.00 2015 QATAR
AMANA QATAR CONTRACTING.CO. ASHGHAL SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS EQUIPMENT
WORK. CONSTRUCTION OF (3) NEW SCHOOLS AROUND DOHA & VILLAGES PACKAGE- 2 STAGE 09.
302,112.00 2015 QATAR
AMANA QATAR CONTRACTING.CO. ASHGHAL SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS SURFACES &
EQUIPMENT WORK. CONSTRUCTION OF (3) NEW SCHOOLS AROUND DOHA & VILLAGES-PACKAGE- 4 STAGE 09.
1,984,802.00 2015 QATAR
SHAPOORJI PALLONGI QATAR WLL QATAR UNIVERSITY SUPPLY & INSTALLATION OF WATER FEATURE MEP WORK AT PROJECT OF NEW COLLEGE OF PHARMACY QATAR UNIVERCITY 1,292,004.00 2015 QATAR
Page 6 of 13
075
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
MR.YOUSUF JASSIM MR.YOUSUF JASSIM CONSTRUCTION OF SWIMMING POOL WORK AT PVT VILLA OF MR.YOUSUF JASSIM 96,000.00 2016 QATAR.
SINOHYDRO COORPORATION LTD. STATE OF QATAR SUPPLY & INSTALLATION OF WATER FEATURE WORK AT NEW PORT PROJECT (NPP0057) AT AL MESAID 514,600.00 2016 QATAR
ARAB UNITED CONSTRUCTION (ARCON) ASHGHAL SUPPLY & INSTALLATION OF LANDSCAPE & IRRIGATION WORK AT ASHGHAL SCHOOL PROJECT PACK-1 STAGE-10A 507,780.00 2016 QATAR.
ARAB UNITED CONSTRUCTION (ARCON) AL AIYA SUPPLY & INSTALLATION OF LANDSCAPING WORK AT AL FARJAN PLAYGROUND WORK AT AL KHOR 500,790.00 2016 QATAR.
INTERNATIONAL TRADING & CONTRACTING M/S.NASSER HOLDING SUPPLY & INSTALLTION OF SQUASH COURT AT 36 VILLA & CLUB HOUSE
AT UMM SALAL. 41,176.00 2016 QATAR
NOORS ENGINEERING WLL. AL SHAMAL MUNICIPALITY
SUPPLY & INSTALLTION OF SPORTS EQUIPMENT WORK AT AL SHAMAL PARK. 38,513.00 2016 QATAR
ARAB UNITED CONSTRUCTION (ARCON) MR.MOHAMAD AL KHAYAREEN
CONSTRUCTION OF SWIMMING POOL WORK AT VIP MAJLIS AT AL SHAHANIYA 340,000.00 2016 QATAR.
MR.MOHAMMED HASSAN K AL- SULAITI MR.MOHAMMED HASSAN K AL- SULAITI RENOVATION WORK OF TILED POOL AT PVT VILLA 32,000.00 2016 QATAR
MR.MOHAMMED HASSAN K AL- SULAITI MR.MOHAMMED HASSAN K AL- SULAITI RENOVATION WORK OF PAINTED POOL AT PVT VILLA 30,000.00 2016 QATAR
LEMIRAGE (SHARAKA HOLDING ) SHARAKA HOLDING SWIMMING POOL WATER MAINTENANCE WORK AT LE MIRAJE VILLAGE -2 30,000.00 2016 QATAR
SOLUTION FOR HEALTHCARE AND MEDICAL SERVICES W.L.L. HE.SHK.MOHD AL THANI SUPPLY AND INSTALLATION OF RUBBER FLOORING WORK AT PROPOSED
CAMEL POOL & OUTSIDE FACILITIES AT AL THARB 26,100.00 2016 QATAR.
AL MADAR CONTRACTING WLL. QDC SUPPLY & INSTALLATION OF SOFT LANDSCAPING & IRRIGATION WORK AT SERVICES COMPOUND & MEDIUM INDUSTRILA AREA 210,000.00 2016 QATAR
CIVILTECH W.L.L ADABISC CIVIL & MEP WORK OF LAZY RIVER AND LAKE AREA IN ANGRY BIRD OUTDOOR - DOHA FESTIVAL CITY - UMM SLAL -QATAR 2,550,000.00 2016 QATAR.
SINGAPORE ENGINEERING CONT. MR.BADAR SUPPLY & INSTALLATION OF SWIMMING POOL MEP+FINISHING WORK AT PROPOSED PALACE AT AL THUMAMA 180,000.00 2016 QATAR
Page 7 of 13
076
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
ARAB UNITED CONSTRUCTION (ARCON) QATAR ARMED FORCES SUPPLY & INSTALLATION OF SPORTS FLOORING WORK AT ABM MILITARY COLLEGE AT DUHAILIYAT CAMP- PHASE-2 177,840.00 2016 QATAR
MR.ABDUL SAMAD MOHD AHMAD MR.ABDUL SAMAD MOHD AHMAD
CONSTRUCTION OF SWIMMING POOL WORK AT MR.ABDUL SAMAD PRIVATE VILLA AT AL WAKRAH 131,000.00 2016 QATAR.
MR.MOHAMMED HASSAN K AL- SULAITI MR.MOHAMMED HASSAN K AL- SULAITI CONSTRUCTION OF 2 NOS. SWIMMING POOL WORK AT PVT VILLA 130,000.00 2016 QATAR
SHELTER QATAR W.L.L MR.NABIL JOHCHAN SUPPLY AND INSTALLATION OF SWIMMING POOL MEP WORK AT LPC 35 VILLA AT PEARL QATAR 100,000.00 2016 QATAR.
ARAB UNITED CONSTRUCTION (ARCON) ASPIRE ZONE FOUNDATION
SUPPLY & INSTALLATION OF EPDM FLOORING, ARTIFICIAL GRASS & SPORTS, FITNESS & KIDS PLAY EQUIPMENT WORK AT AL FARJAN
PLAYGROUND AT AL KHOR 1,903,064.00 2016 QATAR.
ARAB UNITED CONSTRUCTION (ARCON) ASHGHAL SUPPLY & INSTALLATION OF SPORTS FLOORING & EQUIPMENT WORK AT ASHGHAL SCHOOL PROJECT PACK-1 STAGE-10A 1,554,449.00 2016 QATAR
OPTIMIZED DRAGONI INTERNATIONAL FOR INTERIOR DESIGN MURWAB HOTEL INSTALLATION OF 2 SAUNA ROOMS & 2 STEAM ROOM (MEP) WORK AT
MURWAB HOTEL 97,850.00 2017 QATAR.
RAMCO TRADING & CONTRACTING HE.SHK. ABDULLAH BIN KHALED
SUPPLY & INSTALLATION OF OUTDOOR SPORTS FLOORING & GYM EQUIPMENTS 84 VILLAS COMPOUND PROJECT IN AIN KHALED - RAYYAN 91,842.00 2017 QATAR.
(MOI) MINISTRY OF INTERIOR -BUILDING AFFAIRES MANAGEMENT MINISTRY OF INTERIOR SUPPLY & INSTALLTION OF SPORTS FLOORING & SPORTS EQUIPMENT
WORK FOR MINISTRY OF INTERIOR -BUILDING AFFAIRES MANAGEMENT 87,000.00 2017 QATAR.
AL ALEE FOR RECONSTRUCTION MR.SAUD ABDULLAH CONSTRUCTION OF SWIMMING POOL WORK AT PROPOSED 2 NOS. VILLA AT AL JELAIAH FOR MR.SAUD ABDULLAH 82,200.00 2017 QATAR.
SHELTER QATAR W.L.L SHEIKHA AISHA AL THANI
SUPPLY & INSTALLATION OF SP,JACUZZI & WATER FEATURE WORK AT THE PEARL VILLA LPE 39-40-41 AT PEARL QATAR 800,000.00 2017 QATAR.
AL ALEE FOR RECONSTRUCTION
MR.ADEL ALI ALMESLEMANI &
MR.NABEL ALI AL-MUSLIMANI
CONSTRUCTION OF SWIMMING POOL & JACUZZI WORK AT PROPOSED 2 NOS. VILLA AT AL JELAIAH FOR MR.ADEL ALI ALMESLEMANI & MR.NABEL
ALI AL-MUSLIMANI 440,976.00 2017 QATAR.
ARAB UNITED CONSTRUCTION (ARCON) MR.MOHAMAD AL KHAYAREEN
CONSTRUCTION OF SWIMMING POOL WORK AT VIP MAJLIS AT AL SHAHANIYA 340,000.00 2017 QATAR.
AL ALI ENGINEERING W.L.L PEO SUPPLY & DELIVERY OF PICALO TILES WORK AT SALWA BEACH RESORT 240,007.00 2017 QATAR.
Page 8 of 13
077
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
CONTRACO W.L.L PRIVATE ENGINEERING OFFICE
SUPPLY & INSTALLATION OF WATER FEATURE WORK AT SALWA BEACH RESORT PROJECT 2,058,145.00 2017 QATAR.
GULF FALCON MR.ALI BIN KHALIFA AL HITMI
SUPPLY & INSTALLATION OF SWIMMING POOL (MEP+FINISHING ) WORK AT AL HITMI FOX HILLS MUE08 186,155.00 2017 QATAR.
M/S. ADABISC M/S.ADABISC RIVER FINISH & DRY DECK FOUNTAIN WORK AT ANGRY BIRD OUTDOOR-DOHA FESTIVAL CITY-UMM SLAL 1,032,800.00 2017 QATAR
AL SEAL CONTRACTING & TRADING CO. W.L.L QATAR ARMED FORCES
SUPPLY AND INSTALLATION OF SPORTS FLOORING AND EQUIPMENT WORK AT PROPOSED ARMS AND AMMUNITION STORE FOR MILITARY
POLICE - QATAR ARMED FORCES 562,074.00 2018 QATAR
SHEIKH IBRAHIM RASHID AL MOHANNADI SHEIKH IBRAHIM RASHID AL MOHANNADI
SWIMMING POOL WATER MAINTENANCE WORK AT SHEIKH IBRAHIM RASHID AL MOHANNADI VILLA AT AL MARKHIYA 48,000.00 2018 QATAR
KATARA HOSPITALITY KATARA HOSPITALITY DESIGN & BUILD OF FIVE (5) NOS. OUTDOOR PRIVATE POOLS FOR EXECUTIVE VILLAS AT SEALINE BEACH RESORT -KATARA 431,997.50 2018 QATAR
ARAB UNITED CONSTRUCTION (ARCON) PRIMARY HEALTH CARE CORPORATION
SUPPLY AND INSTALLATION OF SOFT LANDSCAPE & IRRIGATION WORK AT AL RAYYAN HEALTH CENTER ( PHCC) 40,000.00 2018 QATAR
ARAB UNITED CONSTRUCTION (ARCON) QATAR PETROLEUM SUPERVISION OF LANDSCAPE MAINTENANCE WORK AT MIC BUSINESS AND RECREATION COMPLEX PACK-1 -QATAR PETROLEUM 360,000.00 2018 QATAR
HAMTON INTERNATIONAL W.L.L ABK SPECIAL PROJECTS SUPPLY AND INSTALLATION OF SWIMMING POOL WORK AT 214 VILLAS PROJECTS AT AL RAYYAN -ABK SPECIAL PROJECTS 350,000.00 2018 QATAR
AL MADAR CONTRACTING WLL. AL AIYA WATER FEATURE MEP WORK AT JUMMA MASJID AT AL DUKHAN 33,500.00 2018 QATAR
MR.HUSSEIN TORKI AL DARMOSH PVT CLIENT SUPPLY AND INSTALLATION OF RUBBER FLOORING WORK AT PVT FARM AT SHIMAISIMA 32,000.00 2018 QATAR
MATTA CONTRACTING QATAR HE.HASSAN AL GHANIM SUPPLY & INSTALLATION OF MOSAIC TILE WORK AT AL WAJBA PALACE AT AL RAYYAN 30,000.00 2018 QATAR
SHAPOORJI PALLONGI QATAR WLL QATAR UNIVERSITY WATER FEATURE MEP WORK AT NEW COLLEGE OF PHARMACY AT QATAR UNIVERSITY 29,583.00 2018 QATAR
TABA TRADING W.L.L PVT CLIENT SUPPLY & INSTALLATION OF SPORTS FLOORING ( POLYTAN S)WORK AT PRIVATE SOCCER FIELD AT RASS LAFFAN 27,346.00 2018 QATAR
Page 9 of 13
078
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
GREATER DOHA TRADING & CONTRACTING
HEIRS OF SHK. ABDULRAHMAN SAUD AL
THANI
CONSTRUCTION OF SWIMMING POOL WORK AT AL WAKRAH FOR HEIRS OF SHEIKH ABDUL RAHMAN AL THANI 260,000.00 2018 QATAR
TABA TRADING W.L.L PVT CLIENT INSTALLATION OF ARTIFICIAL GRASS WORK AT PRIVATE SOCCER FIELD AT RASS LAFFAN 26,000.00 2018 QATAR
HATCO TRADING & CONTRACTING SHK MOHAMMED A AL THANI
SUPPLY AND INSTALLATION OF SWIMMING POOL, SAUNA & STEAM ROOM WORK AT SHEIKH MOHAMMED AL THANI VILLA AT AL WUKAIR-WAKRAH 248,000.00 2018 QATAR
MATTA CONTRACTING QATAR HE.SHK ABDULLAH BIN SAUD AL THANI
SUPPLY & INSTALLATION OF SWIMMING POOL MEP+FINISHING WORK AT RESIDENTIAL APARTMENT AT R-47 AL ERKYAH LUSAIL 220,000.00 2018 QATAR
CONSOLIDATED CONTRACTORS CO.(CCC) MSHEREIB PROPERTIES SUPPLY AND INSTALLATION OF SWIMMING POOL & WATER FEATURES WORK AT MSHEIREB DOWNTOWN DOHA -PHASE 4 PROJECT 2,872,296.00 2018 QATAR
ASPIRE ZONE FOUNDATION ASPIRE ZONE FOUNDATION
SUPPLY,DELIVERY, INSTALLATION AND MAINTENANCE OF CHILDREN PLAY AREA EQUIPMENT AND EXERCISE AREA GYM EQUIPMENT FOR AL BAYT
STADIUM AT AL KHOR 2,513,454.00 2018 QATAR
JORDANIAN SCHOOL JORDANIAN SCHOOL SPORTS FLOOR RENOVATION WORK AT JORDANIAN SCHOOL AT AL WAKRA 18,000.00 2018 QATAR
SHEIKH.HAMAD AL ATTIYAH PALACEMS.HESSA BINT MOHAMMED BIN
ABDULLAH AL ATTIYAH
SWIMMING POOL WATER MAINTENANCE WORK AT SHEIKH.HAMAD AL ATTIYAH PALACE NEAR MALL OF QATAR 108,000.00 2018 QATAR
AL HASBAA CONSTRUCTION W.L.L PVT CLIENT CONSTRUCTION OF SWIMMING POOL WORK AT PROPOSED 45 RESIDENTIAL VILLA PROJECT 103,000.00 2018 QATAR
MR.MOHAMMEAD THANI S A AL HAJRI MR.MOHAMMED THANI S A AL HAJRI
SUPPLY AND INSTALLATION OF SWIMMING POOL WORK AT MR.HAJRI FARM HOUSE AT AL SHAFALLIYA 100,000.00 2018 QATAR
MADAM.RAWDA KHALIFA AL ATEYA MADAM.RAWDA KHALIFA AL ATEYA PRIVATE VILLA OF PALACE AT BANI HAJER MS.RAWDA KHALIFA AL ATEYA 170,000.00 2018 QATAR
MEDGULF CONSTRUCTION CO AL MAJED GROUP SUPPLY & INSTALLATION OF POLYTAN GYM FLOOR HOTEL APARTMENT AT AL MANSOURA 115,000.00 2018 QATAR
MINISTRY OF CULTURE & SPORTS MINISTRY OF CULTURE & SPORTS
RENOVATION OF QATAR SPORTS CLUB’S COMPETITION AND WARM-UP ATHLETICS RUNNING TRACKS AND SUB-BASE SYSTEM FOR MINISTRY OF
CULTURE & SPORTS -MCS-TAC-PJ-135-2019 18,000,000.00 2019 QATAR
QATAR MUSEUMS AOUTORITY (QMA) QATAR MUSEUMS AOUTORITY
REPLACEMENT, INSTALLATION AND COMMISSIONING OF PARTS FOR FOUNTAIN SYSTEM IN MUSEUM OF ISLAMIC ARTS 2,625,447.38 2019 QATAR
SUPREME COMMITTEE FOR DELIVERY & LEGACY
SUPREME COMMITTEE FOR DELIVERY &
LEGACY
SUPPLY AND INSTALLATION OF FOOTBALL GOAL POSTS & CORNER FLAG EQUIPMENT -TDO-19-CP-0057 2,200,435.00 2019 QATAR
Page 10 of 13
079
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
RAMCO TRADING & CONTRACTING HE.SHK. ABDULLAH BIN KHALED
REMAINING SWIMMING POOL WORK & SPORTS FLOORING & SPORTS EQUIPMENT WORK ANDALUS SCHOOL COMPOUND -UMM SLAL 1,915,943.00 2019 QATAR
AL SARH/INSHA CO FALCON REAL ESTATE SUPPLY & INSTALLTION OF ARTIFICIAL LAWN , GRASS CLADING, JOGGING TRACK PROPOSED HOTEL APRTMENT AT AL SADD (3B+G+7) 198,141.00 2019 QATAR
AMAD CONSTRUCTIONS WLL MR.MOHAMMED JASSIM AL KUWARI
SUPPLY & INSTALLATION OF SWIMMING POOL WORK SUPPLY & INSTALLATION OF SWIMMING POOL WORK AT IZGHAWA COMPUND 110,000.00 2019 QATAR
ARCON QATAR SAMASH REAL ESTATE INITIAL FITTING WORKS FOR THE SWIMMING POOL NEWTON SCHOOL AT WADI AL BANAT 100,610.00 2019 QATAR
ADABISC ADABISC WATER MAINTENANCE WORK LAZY RIVER AT DOHA FESTIVAL CITY 34,080.00 2019 QATAR
JAFRA FOR TRADING & CONTRACTING CO. PVT CLIENT SUPPLY & INSTALLATION OF HEAT COOL PUMP PRIVATE VILLA AT PEARL QATAR 27,000.00 2019 QATAR
CHINA RAILWAY W.L.L MR.NASSER KASEM DARWISH FAKHROO
ENGINEERING FOR SWIMMING POOL PIPING WORK OASIS LUXURY HOTEL AT AL KHULAIFAT 25,000.00 2019 QATAR
SUPREME COMMITTEE FOR DELIVERY & LEGACY
SUPREME COMMITTEE FOR DELIVERY &
LEGACY
SUPPLY AND INSTALLATION OF CHILDREN'S PLAY AREA AND ADULT FITNESS EQUIPMENT AT KATARA AND AL JANOUB STADIUM 6,033,287.00 2019 QATAR
AL NAKHEEL LANDSCAPESUPREME COMMITTEE
FOR DELIVERY & LEGACY
SUPPLY AND INSTALLATION OF CHILDREN'S PLAY AREA AND ADULT FITNESS EQUIPMENT FOR TSP31 AL WAHDA PARK 6,200,000.00 2019 QATAR
MS.HESSA BINT MOHD BIN A ATTIYA SHK.HAMAD ALI AL ATTIYA SUPPLY & INSTALLATION OF JACUZZI EQUIPMENT - ATTIYA PALACE 18,000.00 2019 QATAR
GULF FALCON ALI BIN KHALIFA AL HITMI SUPPLY AND INSTALLATION OF SWIMMING POOL WORK AT AL HITMI FOX HILLS MU/E08 186,155.00 2019 QATAR
AMAD CONSTRUCTIONS WLL MR.MUBARAK AL KUWARI SWIMMING POOL CIVIL WORK AT MR.MUBARAK AL KUWARI VILLA 600,000.00 2019 QATAR
AL ALI ENGINEERING CO PEOSUPPLY AND INSTALLATION OF SPORTS FLOORING & SPORTS
EQUIPMENT WORK AT DESIGN& BUILD OF AMIRI GUARD BUILDINGS AND FACILITIES AT LUSAIL
467,027.00 2019 QATAR
MR.FADI SANWAR PEO SUPPLY OF SWIMMING POOL CLEANING ACCESSORIES WORK AT SALWA BEACH RESORT 3,942.00 2019 QATAR
Page 11 of 13
080
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
MR.MOHAMD ZAYED AL KHAYAREEN MR.MOHAMD ZAYED AL KHAYAREEN
WATER MAINTENANCE WORK AT VIP MAJLIS AT AL SHAHANIYA AT WATER MAINTENANCE WORK AT VIP MAJLIS AT AL SHAHANIYA 18,000.00 2019 QATAR
OPTIMIZED DRAGONI INTERNATIONAL FOR INTERIOR DESIGN MURWAB HOTEL INSTALLATION OF 2 SAUNA ROOMS & 2 STEAM ROOM (ONLY MEP) WORK
AT MURWAB HOTEL NEAR CITY CENTRE DOHA 178,525.00 2019 QATAR
ARCON QATAR QATAR ARMED FORCES LANDSCPAE AND IRRIGATION WORK AT CONSTRUCTION OF OFFICERS CLUB AT KARAANAH CAMP 170,000.00 2019 QATAR
MADAM SHEIKHA AL TWAR MADAM SHEIKHA AL TWAR
SWIMMING POOL & WATER FOUNTAIN WORK AT SHAIKHA JABOR S T AL KUWARI VILLA AT AL LEABAIB 181,234.00 2019 QATAR
SUPREME COMMITTEE FOR DELIVERY & LEGACY
SUPREME COMMITTEE FOR DELIVERY &
LEGACY
SUPPLY AND INSTALLATION OF GYM EQUIPMENT WORK AT DOHA PORT REDEVELOPMENT PROJECT 187,339.00 2020 QATAR
RESCUE CENETR AT AL SAILIYA SHEIKH HAMAD BIN ALI AL ATIYAH
SUPPLY AND INSTALLATION OF ELECTRIC HEATER WORK AT RESCUE CENETR AT AL SAILIYA 47,310.00 2020 QATAR
QATAR ATHLETICS FEDERATION (QAF) QATAR OLYMPIC COMMITTEE SUPPLY AND INSTALLATION OF SPORTS FLOORING AT KATARA 35,090.00 2020 QATAR
MINISTRY OF INTERIOR ( MOI) MOISUPPLY AND INSTALLATION OF CUSTOM BUILT SAUNA AND JACUZZI AT
COAST GUARD BASES AT RAS MATBAKH (AL KHOR) AND SHWAIMSAH ( AL WAKRA)
380,197.40 2020 QATAR
AL JABER ENGINEERING CO. WLL ISF SUPPLY AND INSTALLATION OF SPORTS EQUIPMENT AT DESIGN AND CONSTRUCTION OF CORRECTIONAL FACILITIES AND FEMALE FORCES 94,000.00 2020 QATAR
AL JABER ENGINEERING CO. WLL ISF SUPPLY AND INSTALLATION OF ARTIFICIAL GRASS WORK AT DESIGN AND CONSTRUCTION OF CORRECTIONAL FACILITIES AND FEMALE FORCES 185,832.00 2020 QATAR
AL JABER ENGINEERING CO. WLL ISFSUPPLY AND INSTALLATION OF ARTIFICIAL GRASS WORK AT DESIGN AND
CONSTRUCTION OF CORRECTIONAL FACILITIES AND FEMALE FORCES (TRAINING VILLAGE)
73,167.00 2020 QATAR
AL JABER ENGINEERING CO. WLL ISFSUPPLY AND INSTALLATION OF STEAM ROOM,SAUNA CABIN & JACUZZI
WORK DESIGN AND CONSTRUCTION OF CORRECTIONAL FACILITIES AND FEMALE FORCES
198,000.00 2020 QATAR
AL JABER ENGINEERING CO. WLL ASHGHAL SUPPLY AND INSTALLATION OF RUNNING TRACK WORK AT AL RAYYAN STADIUM 2002 (PACKAGE -06) 780,500.00 2020 QATAR
INTEGRATED GARDEN -AAE PEO SUPPLY AND INSTALLATION OF IRRIGATION PUMP WORK AT AMAIRI GUARD BUILDING & FACILITIES 132,000.00 2020 QATAR
Page 12 of 13
081
List of Ongoing / Completed Projects in Qatar
MAIN CONTRACTOR CLIENT DESCRIPTION VALUE (QAR) YEAR AREA
PETROSERV LTD WLL ARAIN REAL ESTATE SUPPLY AND INSTALLATION OF LINEAR AND DRYDECK WATER FOUNTAIN WORK AT YASMEEN CITY INFRASTRUCTURE WORK -LUSAIL 1,525,019.66 2020 QATAR
Page 13 of 13
082
WAVES TRADING AND CONTRACTING W.L.L.
A SELECTION OF AQUASCAPES UNIT PROJECTS
Contractor Client Description Value Year AreaLe Meridien (Mina
Seyahi)
Mina Seyahi Swimming Pool + Landscaping Works (Mina Seyahi) 5,525,906.00 2003 UAE
Mirage Mille Al Qasr Hotel & Dar
Masyaf
59 Nos. Water Features + fountain (Pkg. 2036).Madinat
Jumeirah, Al Qasr Hotel & Dar Al Masyaf
4,427,109.00 2003 UAE
Al Ghanim Int'l
General Trading &
Contg. Co.
Avenues Shopping Mall
Fish Tanks, Internal & External W/Feature Works at The Avenues Shopping Mall - Phase II, Kuwait
12,855,175.50 2007 UAE
Al Hamed Development &
Construction
Palm Island 226 Nos. Swimming Pool - Palm Island, Jumeirah (Civil &
MEP ) (PD-870)
8,641,352.19 2004 UAE
Besix Arabtec Joint
Venture
Burj Dubai Burj Dubai Development, Lake Hotel Pools and Water Features, Design, Supply & Supervision for Installation of
Puddle Flange to Swimming Pool (Address Hotel)
9,186,886.00 2006 UAE
Samsung / Bisix /
Arabtec Joint Venture
Burj Dubai Burj Dubai Development, The Burj Tower Subcontract
Package S-07, Swimming Pool & Water Features.
15,954,442.00 2006 UAE
ARCO Irrigation and Landscaping Est
Shoreline Apartments S/Pool, C/Pool, Gazebo works (5 Nos.) Shoreline Apartments, The Palm Jumeirah
8,740,520.00 2006 UAE
Al Naboodah Engineering Services
Discovery Gardens Swimming Pool & Children's Pool Works at Discovery Gardens (Main Pool & Kids Pool No.2,3,4,5,9,10,12
including water Proofing works, Heat Pumps & Ozonators)
8,890,668.45 2007 UAE
Al Naboodah Contracting LLC
Al Barari Al Barari Development - Phase - 1 Zone 1 Villa Landscaping Swimming Pool, Spa and Plunge Pool Works
78,971,457.00 2007 UAE
Arabtec Emirates Sunland Joint
Venture
Palazzo Versace Hotel Swimming Pools, Spas, Light & Pool Maintenance works for Palazzo Versace Hotel, Culture Village, Al Jadaf,
Dubai
7,044,500.08 2010 UAE
Evan Lim - Penta Constr. Co. LLC.
Sofitel Resort Swimming Pools, Spas & Water features works for Sofitel Resort, Package-VII, Palm Jumeirah, Dubai
22,000,000.00 2010 UAE
085
Al Futtaim Carillion Marina Hotel Construction of Water Features at Marina Hotel, Yas
Island, Abu Dhabi
14,111,750.00 2009 UAE
Al Tayer Stocks LLC Marina Hotel M&E Works for Water Features at Marina Hotel, Yas Island, Abu Dhabi
6,448,960.00 2009 UAE
Engineer's Office Club Complex Supply & installation of landscape External Lighting for Club Complex at Nad Al Sheba, Dubai (Project No. P102
0800)
1,771,741.15 2009 UAE
Hilton Abu Dhabi Abu Dhabi M&E works repair / replacement of equipment in plant
room no. 2 in Abu Dhabi
1,100,786.00 2010 UAE
Al Nuaimi Group Armed Forces MEP Works for swimming pool for U.A.E Armed Forces at Ras Al Khaimah
1,955,447.00 2010 UAE
Ali Moosa & Sons
Contracting
Ajman Palace Water Feature 1&3 for Outdoor Service Yard on private
Place in Ajman for H.H Shk. Ammar Bin Humaid
1,500,000.00 2010 UAE
Six Construct Co.Ltd.
Presidential Terminal MEP works for 2 nos. of Water Feature at Presidential Flight - State Guest Reception Terminal - Abu Dhabi
2,601,850.00 2010 UAE
Master Electrical & Mechanical Works
LLC
Zirku Island MEP works for the Refurbishment of 2 Nos. Swimming Pools for Zadco in Zirku Island, Abu Dhabi
1,950,000.00 2010 UAE
Six Construct Co.
Ltd.
Cleveland Clinic Construction of Water Feature at Cleveland Clinic 27,200,000.00 2011 UAE
Yousef General Contracting Est.
Manama Camp MEP works for Swimming Pool at Al Manama Camp 1,000,000.00 2011 UAE
Samsung
Engineering Co. Ltd
Ruwais Refinery Installation of Intergrated water system for Temporary camp area in Ruwais refinery expansion project, Abu
Dhabi, UAE
19,000,000.00 2011 UAE
Emirates Link
Maltauro LLC
Brighton College MEP Works for Swimming Pool & Kids Pool for Brighton
College on Plot No. 102-106, Sector E-48, Abu Dhabi
1,200,000.00 2011 UAE
086
ACTIONCRETE Concrete repairs Ornate structures (Nadd Al Sheeba
Camel Race course, Hatta Fort,Ranches – Wind towers, Shk.Zayed Majlis – Hilton Alain,Janadriyah Tent structures, SaudiArabia, Shade umbrellas Abu DhabiCorniche)
Composite piling / beach protectionworks
Basement pile / diaphragm wallshotcreting
Underground structures such aslifting stations, underground tanksetc.
Silicate injection against leakage inconcrete structures
Small works Refurbishment of old structures
(India Club, Dubai Ladies Club,Rumaithy Building, Building in theDubai Souq)
Equipment hire
087
Actioncrete Page 1 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
BHP WATER TREATMENT CONSTRUCTION OF MANHOLES 2.1M DIA AT 8M DEEP
1,130,553 2010 DUBAI
KAP AL MUHAIRY & AL RAYES
CONTRACTING
SWIMMING POOL, SPA & KIDS POOL AT ZABEEL
HEALTH CLUB
210,000 2010 DUBAI
AL QANTARA GENERAL CONTRACTING SHOTCRETE / GUNITING WORKS FOR CONSTRUCTION AND MAINTENANCE OF COMMERCIAL BUILDINGS
460,000 2010 ABU DHABI
UNITED DEC0RATIONS REFURBISHMENT WORKS TO THE PENT HOUSE
OF MR. SAEED BELHASA
84,449 2010 DUBAI
TARGET ENGINEERING CONSTRUCTION APPLY GUNITE MIX TO LINE AND LEVEL AT HOSPITAL FRANCE EMIRIEN
100,650 2010 ABU DHABI
DEWA CONSTRUCTION OF TEMPORARY ACCESS ROAD AROUND TREATMENT PLANT AT NAZWASHABIA
60,000 2010 DUBAI
GAP CORP FNI FZ LLC REFURBISHMENT WORKS TO PROPOSED VILLA TYPE 5B, VILLA NO. H32
315,000 2010 DUBAI
EMIRATES BUILDING GUNITE WORKS TO WALLS AND CEILING –
EMARATI VILLAS AT YAS ISLAND
1,800,000 2010 ABU DHABI
DHABI CONTRACTING SUPPLY AND APPLICATION OF GUNITE INCLUDING
REINFORCEMENT ON BASEMENTS SHORING
SYSTEM FOR 3 STAR HOTEL
370,000 2010 ABU DHABI
DHABI CONTRACTING SUPPLY AND APPLICATION OF GUNITE INCLUDING REINFORCEMENT ON BASEMENTS SHORING SYSTEM FOR NATIONAL BANK OF ABU DHABI
178,000 2010 ABU DHABI
MUSANDA MAINTENANCE WORKS FOR UNDERGROUNG
PARKING – JUMEIRAH
1,606,281 2010 ABU DHABI
WAVES TRADING AND CONTRACTING W.L.L.
A SELECTION OF ACTIONCRETE PROJECTS
088
Actioncrete Page 2 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
TASAMEEM STX CONSTRUCTION CO LLC SHOTCRETE TO SECANT PILE AT RESIDENTIAL DEVELOPMENTS AT PLOT C 69 AND PLOT C77 AT RAWDHAT
296,495 2010 ABU DHABI
AL QANTARA GENERAL CONTRACTING COMPANY LLC
SHOTCRETE TO SECAN PILE AT COMMERCIAL BUILDING FOR MR. SALEM MUBARAK DHAI AL MANSOORI AT SECTOR ME-10, PLOT NO. C285 ,
160,000 2010 ABU DHABI
MUSANDA REPAIRING & STRUCTURE REHABILITATION OF
BUILDINGS OF THE STATE SECURITY - ABU DHABI
425,370 2010 ABU DHABI
JID MANAGEMENT & CONSULTANTS FZ LLC REFURBISHMENT WORKS FOR G+1 VILLA
#3,MEADOWS
130,270 2010 DUBAI
NAKHEEL REFURBISHMENT OF POOLS IN GARDEN VIEWS
VILLA 208 NOS. IN JEBEL ALI
1,500,000 2009 DUBAI
NAKHEEL REFURBISHMENT OF COMMUNITY CLUB
SWIMMING POOL AT GARDEN VIEW VILLAS
730,800 2009 DUBAI
ENGINEER'S OFFICE AL QUAFFAY ISLAND JOGGING TRACK (CIVIL
WORKS)
1,549,488 2009 ABU-DHABI
MEYDAN LLC / MS TEO A KHING DESIGN
CONSULTANT SDN
CONSTRUCTION, TESTING, COMMIISSIONING OF THE SEWAGE LIFTING STATION NO. 1 IN RELATION TO THE PROPOSED DEVELOPMENT AND CONSTRUCTION OF THE NAD AL SHEBA
5,656,000 2009 DUBAI
AL NABOODAH ENGINEERING LLC SHOTCRETING TO RATAINING WALLS D ,G& H FOR
GARDEN VIEW VILLAS-ROADS AND
INFRASTRUCTURE WORKS
275,040 2009 DUBAI
AL ROSTAMANI PEGEL LLC TAMANI ARTS OFFICE PROJECT- SHOTCRETE WORKS TO SHORING PILES
573,300 2009 DUBAI
AL ROSTAMANI PEGEL LLC PROPOSED B2B TOWER 2 B+G+3P+19 ON PLOT NO. 45 AT BUSINESS BAY DUBAI -SHOT CRETE WORKS TO PILING PILES
237,250 2009 DUBAI
NATIONAL PROJECT CONSTRUCTION LLC GUNITING WORKS FOR SWIMMING POOLS-HIGH
LAND RESORT VILLAS W-51 ABU-DHABI
306,815 2009 ABU DHABI
089
Actioncrete Page 3 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
MEYDAN FIRE FIGHTING TANK IN RELATION TO PROPOSEDDEVELOPMENT AND CONSTRUCTION OF THE NADAL SHEEBA RACE COURSE ON PARCEL ID 600-6888NAD AL SHEEBA DUBAI UAE
2,401,432 2009 DUBAI
AL SHAMSI TRADING & CONTRACTING CONCRETE REPAIR TO BUILDING SHARJAH 360,316 2009 DUBAI
MEYDAN LLC PROPOSED HORSE PATH ALONG ROAD 1 A 817,283 2009 DUBAI
MEYDAN LLC STRUCTURAL WORKS FOR STAIRCASE AND LIFT CORE WALL FOR CARPARK, ELEVATED ROADS AND EXTERNAL WORKS (FALCON WING TIP)
3,000,000 2009 DUBAI
AL KHALEEJ SUGAR NEW MOLASSES PIT –GUNTING WORKS 299,904 2009 DUBAI
HILTON BEACH ABU DHABI REFURBISHMENT OF PLANTER WALLS-HILTON
BEACH ABU DHABI
139,551 2008 ABU DHABI
M/S. AL ROSTAMANI PEGEL SUPPLY AND APPLY OF GUNITE WORKS AT THE
AVIATION CLUB HOTEL P-054
287,500 2008 DUBAI
M/S. ROSTAMANI PEGEL LLC. M/S. OMNIYAT PROPERTIES NINE LTD.
GUNITING WORKS AT THE PAD ON PLOT NO. BB.B01.061 BUSINESS BAY
239,200 2008 DUBAI
M/S. ROSTAMANI PEGEL LLC. M/S.
OMNIYAT PROPERTIES NINE LTD.
GUNITING WORKS AT THE PAD ON PLOT NO.
BB.B01.061 BUSINESS BAY
287,500 2008 DUBAI
M/S. ENGINEERING OFFICE S/POOL WALL/SOFFIT LEAKAGE, DECK
WATERPROOFING AND DECK TILE
REINSTATEMENT IN AL MANARA
182,725 2008 ABU DHABI
M/S. SOBHA CONTG. SUPPLY AND INSTALLATION OF SHOTCRETE HYDRO BLASTING
272,600 2008 DUBAI
090
Actioncrete Page 4 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
MR. AHMED RAMADAN JUMA EST.M/S ACCESS ENGG. CONSULTANT, M/S. MODERN EXECUTIVE SYSTEM CONTG.
SHOTCRETE WORKS TO BASEMENT PILES AT
JUMEIRAH HYPERMARKET
177,000 2008 DUBAI
M/S. FAISAL ABDULLAH AL GURG, M/S. AL GURG CONSULTANT, M/S. BIN BELAILA CONTG.
SHOTCRETE WRORKS TO SHORING PILES AT BASEMENT IN 2B+G+5 BLDG. ON PLOT NO. 319-288 IN AOU METHA
128,845 2008 DUBAI
M/S. AL ROSTAMANI PEGEL SHOTCRETE WRORKS TO SHORING PILES AT
BASEMENT IN2B+G+4P+24 FLOORS +R+PARK
LANE TOWER ON PLOTS NO. BB.A02.010 AT
BUSINESS BAY-DUBAI
174,800 2008 DUBAI
SHK HASSER AL MAKTOUM, M/S. AL
AHMADIAH CONTG.
GUNITNG WORKS TO SECANT PILES AT 3B+G+M+5 COMM. BLDG. ON PLOT NO.319-260 AT OUD METHA
390,000 2008 DUBAI
M/S. JT METRO JV HIRE OF SHOTCRETE MACHINE AND MOBILISATION
151,300 2008 DUBAI
M/S DHABI ENTERPRISES EST. CONCRETE REPAIR FOR AL KHANZA VILLA IN ABU
DHABI
570,000 2008 ABU DHABI
M/S. EMIRATES BANK, M/S. GAMMON &
BILLIMORIA BUILDING & CIVIL ENGG. LLC
GUNITING WORKS ON 2B+G+P+25 UPPER FLOORS RESIDENTIAL/COMMERCIAL BUILDING AT AL NAHDA FIRST FOR M/S. EMIRATES BANK-DUBAI
183,600 2008 DUBAI
M/S TULIPS BUSINESS DEVELOPMENT / M/S BUSET CONTRACTING & GEN TRANSPORT CO. LLC
SHOTCRETE WORKS TO SECANT PILES AT 2B+G+3P+16 TYP OFFICE BLDG. ON PLOT BB.B03.B.016 FOR M/S TULIP BUSINESS DEVELOPMENT, DUBAI PROPERTIES IN BUSINESS BAY
350,000 2008 DUBAI
M/S AL NAHDA REAL ESTATE & TRADING / M/S KHATIB & ALAMI / M/S SUN ENGINEERING & CONTRACTING CO. LLC
SHOTCRETE WORKS TO SHORING PILES AT SAHARA MALL PHASE 1 ON PLOT NO. 544 AT AL NAHDA, SHARJAH FOR M/S AL NAHDA REAL ESTATE & TRADING
604,535 2008 DUBAI
M/S NAKHEEL REFURBISHMENT OF COMMUNITY CLUB
SWIMMING POOL AT GARDEN VIEW VILLAS
730,800 2008 DUBAI
091
Actioncrete Page 5 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
M/S DUBAI PROPERTIES / M/S PLANQUADRAT MIDDLE EAST / M/S ASSOCIATED CONSTRUCTIONS & INVESTMENT CO. LLC
GUNITE WORKS FOR P-186 SOUTH ZONE AT BUSIINESS PARK, BUSINESS BAY
426,250 2008 DUBAI
M/S RANI INTERNATIONAL DEVELOPMENT /
M/S CONFLUENCE PROJECT MANAGEMENT/ M/S AL NABOODAH CONTRACTING
SHOTCRETE WORKS FOR THE OBEROI CENTER ON PLOT NO.BB.A002 & 003 AT BUSINESS BAY, DUBAI
1,091,216 2008 DUBAI
M/S BIN LADIN CONTRACTING GROUP SHOTCRETE WORKS TO SHORING SYSTEM FOR
BURJ DUBAI DEVELOPMENT PARK – PLOT 35
447,862.00 2008 DUBAI
M/S AL NABOODAH LAING O’ROUKE SHOTCRETE WORKS TO SECANT PILES FOR RASIS BUSINESS CENTER (PHOENIX HQ)
485,850.00 2008 DUBAI
M/S AL FARA’A CONSTRUCTION &
INDUSTRIAL GROUP
SHOTCRETE WORKS TO SHORING PILES AT
3B+G+(10/16/10). THE MANHATTAN @ JVS DUBAI
420,000.00 2008 DUBAI
M/S ALDAR LAING O’ ROUKE PROJECT MANAGEMENT SERVICES / M/S CANSULT MAUNSELL
CONSTRUCTION OF IRRIGATION RESERVOIR & SEWER PUMPING STATIONS AT AL RAHA BEACH DEVELOPMENT
32,185,664 2008 ABU DHABI
M/S ACI (GmbH) M/S SHINSUNG ENGINEERING & CONSTRUCTION LLC
557,625.00 2008 DUBAI
Q-CONSTRUCTION GUNITING WORKS FOR MORINA RESEIDENTIAL
TOWER, AL REEM ISLAND ABU DHABI
225,000 2008 ABU-DHABI
M/S AL HABTOOR ENGINEERING ENTERPRISES
SHORTCRETE WORKS (GUNITING) TO PILE WALLS 271,050 2008 DUBAI
H.H. RULER’S COURT CONSTRUCTION OF SERVICE BLOCK AT DESERT
MAJLIS, JEBEL ALI FOR H.H. SHEIKH ALIYA BINT
KHALIFA AL MAKTOUM
1,315,160 2007 DUBAI
BUSET CONTG. & GEN TRANSPORT CO.
LLC
SHOTCRETE WORK TO SHORING PILES, PORT
SAEED FOR MR. DHAHI KHALFAN DHAHI BIN TAMIM
152,550 2007 DUBAI
BUSET CONTG. & GEN TRANSPORT CO.
LLC
SHOTCRETE WORK TO SHORING PILES, PORT
SAEED FOR MR. HAMAD KHAMIS AL GHUWAIS
201,250 2007 DUBAI
AL DHAFRA PIPELINE & CONTG. CO. (APCC)
WLL
SHORTCRETE WORKS TO SECANT PILES &
CONTIGUOUS PILES AT PARK TOWER DIFC
134,520 2007 ABU DHABI
092
Actioncrete Page 6 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
SAMSUNG – BAYTUR JV BURJ DUBAI DEVELOPMENT BD- 12 & 13 BLDGS. –SHOTCRETE WORKS TO SHORING PILES.
140,000 2007 DUBAI
BELHASA ENGINEERING AND
CONTRACTING LLC
BELHASA INTERNATIONAL BUILDING ON PLOT NO. 133-248 AT HOR AL ANZ, DUBAI, and SHOTCRETE WORKS TO SECANT PILES AND BLOCK WALL.
247,950 2007 DUBAI
BELHASA ENGINEERING AND
CONTRACTING LLC
DIAMOND 7, 2B+G+13 RES. TOWER – SHOTCRETE
WORKS TO SECANT PILES & BLOCK WALL FOR MR.
ABDUL REHMAN SALEM AL MAZROUEI
111,720 2007 DUBAI
WAFRA CONSTRUCTION SHOTCETE WORKS TO SHORING PILES AT 3B+G+BRES. TWIN BLDGS. ON PLOT NO. 134-1036/1037 ATAL MAMZAR, DUBAI FOR EMIRATES ISLAMIC BANK
235,000 2007 DUBAI
AL AHMADIAH CONTG. & TRADING SUPPLY AND APPLY OF GUNITE WORKS –
JUMEIRAH BUSINESS CENTRE TOWERS
720,800 2007 DUBAI
CASTLE CONSTRUCTION 2B+G+M+7+PH HOTEL DEVT. ON PLOT NO. 124-922
AT AL MURRAQABAT
197,200 2007 DUBAI
COMMODORE CONTG. CO. LLC PRISM TOWER AT BUSINESS BAY – SHOTCRETE
WORKS TO SECANT PILES
462,875 2007 DUBAI
M/S CHINA RAILWAY 18TH BUREAU GROUP L.L.C.
SUPPLY & APPLY OF SHOTCRETE & GUNITING WORKS AT 3B+G+6 COMM. BLDG. ON PLOT NO.321-193 IN AL MINA DUBAI
118,000 2007 DUBAI
AL ARRAB GENERAL CONTRACTING CO. SHOTCRETE WORKS TO SHORING PILES AT
REGAL TOWER
170,200 2007 DUBAI
EMIRATES AIRLINES/ ARCHGROUP/ NASA
MULTIPLEX LLC
SHOTCRETING WORKS AT EMIRATES PARK TOWER HOTEL ON PLOT NO. BB.A02.022, BUSINESS BAY
1,170,370 2007 DUBAI
AL HABTOOR ENGG. ENTERPRISES CO. LLC.
SHOTCRETE WORKS TO SECANT PILES AT AL GHURAIR CITY EXPANSION PHASE II
163,658 2007 DUBAI
093
Actioncrete Page 7 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
DUTCO BALFOUR BEATTY SHOTCRETE WORKS TO SECANT PILES AT 3B+G+4+PR+24 COMM. BLDG. ON PLOT NO. BB.A03.050 AT BUSINESS BAY FOR THE BINARY DEVPT. LIMITED.
193,590 2007 DUBAI
AL HABTOOR ENGG. ENTERPRISES CO. LLC.
SHOTCRETE WORKS AT IRISH BAY TOWER ON PLOT NO. BB. A02.005 IN BUSINESS BAY, DUBAI
251,600 2007 DUBAI
M/S MOHAMMED BIN RASHID HOUSING PROGRAM/ M/S. PARSON INTERNATIONAL LTD./ M/S. ARABTEC CONSTRUCTION LLC.
CONSTRUCTION OF SEWAGE FOR MS/.
MOHHAMED BIN RASHID HOUSING PROGRAM
3,295,710 2007 DUBAI
AL NABOODAH CONTRACTING GUNITE WORKS AT I RAISE OFFICE TOWER IN
TECOM SITE C PLOT NO. C-006-005
367,650 2007 DUBAI
CFH CONSULTANTS / M/S. CONSOLIDATED
CONTRACTORS INTERNATIONAL CO. SAL.
SHOTCRETE WORKS AT 3B+G+18 RES. TOWER ON
PLOT NO. BB.A05-005 AT BUSINESS BAY, DUBAI
116,175 2007 DUBAI
M/S. NAKHEEL REFURBISHMENT OF POOLS IN GARDEN VIEWS
VILLA 208 NOS. IN JEBEL ALI
1,500,000 2007 DUBAI
M/S. LOOTAH CONTG. CO. GUNITE WORKS AT 2B+G+M+3 BLDG ON PLOT NO.
214-282 I GARHOUD, DUBAI
108,350 2007 DUBAI
WATSON CONCRETE REPAIR WORKS AT AL FUTTAIMTOWER BUILDING G+16 ON PLOT NO. 119=235 ATAL RIQQA DUBAI.
796,486 2006 DUBAI
GENERAL AUTHORITY FOR HEALTH
SERVICES.
REFURBISHMENT OF DEFECTIVE CONCRETE FOR
MEDICAL BUILDING AT AL MAFRAQ HOSPITAL.
163,000 2006 ABU DHABI
ASCON GUNITE WORKS ON PILES & DIAPHARAGM AT4B+G+7 COMM/OFFICE BUILDING AT AL MUTEENA,DEIRA DUBAI.
112,000 2006 DUBAI
DUTCO CONSTRUCTION CO, LLC. COLOURED RENDER WORKS TO FALAJ AT DUBAI HERITAGE VISION AT DUBAI LAND.
176,000 2006 DUBAI
INDIA CLUB REFURBISHMENT OF SWIMMING POOL BLOCK-
DESIGN CONSULTANCY
233,350 2006 DUBAI
DHABI ENTERPRISES ECT. CONCRETE WORKS TO SOFFIT AT AL BATEEN PALACE, ABU DHABI
182,600 2006 ABU DHABI
094
Actioncrete Page 8 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
UNIMIX SHOTCRETE WORKS TO WASTE WATER SETTLEMENT LAGOON
250,000 2006 DUBAI
BUSET CONTRACTING & GENERAL
TRANSPORT
SHOTCRETE WORK TO SHORING PILE, AL MARSA 290,000 2006 DUBAI
INDIA CLUB REFURBISHMENT OF EXISTING SWIMMING POOL &ADMINISTRATION BLDG. BLOCK- PRELIMINARIES,DEMOLITION & REPAIR WORK TO FOUNDATION,PLINTH, SLAB, SWIMMING POOL COLUMNS
1,570,000 2006 DUBAI
BUREAU VERITAS CONCRETE REPAIRS FOR LAUNDRY SOFFIT AT
HILTON HOTEL, ABU DHABI
100,000 2005 ABU DHABI
H.H. THE RULER’S COURT CONCRETE REPAIRS AT GATE HOUSE 2 FOR AL MAKTOUM’S PALACE
185,837 2005 DUBAI
TEAM ENGINEERING SHOTCRETE WORKS TO SECANT PILES ATBASEMENT LEVEL FOR MR. ABNAA ABDULLAABDUL RAHMAN SHARAFI, AL BARSHA FIRST
126,000 2005 DUBAI
HILTON – ABU DHABI / NATIONAL HOTELS CONCRETE REPAIR WORKS 275,000 2004 ABU DHABI
RULER’S COURT DESERT MAJLIS FOR H.H. SHEIKHA ALIYA BINT KHALIFA AL MAKTOUM
6,393,375 2004 DUBAI
EMIRATES BANK SHOTCRETE TO SECANT PILE FOR SHK NAHYAN 154,000 2004 ABU DHABI
RULER’S COURT GUNITE REPAIR WORKS 301,750 2004 DUBAI
TARGET MARINA GUNITE CIRCULUM TANK WALL 168,655 2004 ABU DHABI
CROWN PRINCE PVT. MANAGEMENT WATER PROOFING & TILING, DOSING 727,900 2004 ABU DHABI
H.H THE RULER’S COURT CONCRETE REPAIRS FOR STRUCTURAL COLUMS
AT THE OLD DIWAN BUILDING.
485,000 2004 DUBAI
AL HUDA CONTRACTING CO L.L.C GUNITE FOR PVT VILLA NO 2,3,4 AT PLOT NO 314-108 UMM HURAIR STREET GUNITING
139,500 2004 DUBAI
095
Actioncrete Page 9 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
RULER’S OFFICE CONRETE REPAIR WORKS TO OVERHEAD TANK FOR SKEIKHA MARIYAM’S PALACE
105,000 2003 DUBAI
EMIRATES CONTRACTING CO. CONCRETE REPAIRS TO COMM/OFC BLDG. FOR
SHEIKH AL MAKTOUM
280,800 2002 DUBAI
AL FUTTAIM TARMAC CONSTRUCTION OF TOWER STRUCTURES IN ARABIAN RANCHES
184,793 2002 DUBAI
AL SHAFAR INJECTION WORK IN RAHA RESIDENCE 100,000 2000 DUBAI
LIWA GENERAL CONTRACTING SUPPLY AND INSTALL EPOXY SCREED IN DRAINAGE CHANNEL
196,500 2001 DUBAI
SHK. SUROOR BIN MOHD AL NAHAYYAN GROUND STABILIZATION AND REPLACEMENT OF
HOUSE BEAM
950,000 1998 AL AIN
PETROSERV LTD. – QASCO PLANT COMPLETE STRUCTURAL REFURBISHMENT OFUNDERGROUND SERVICE TUNNELS INCLUDINGINJECTION PUMPING THROUGH TUNNELSTRUCTURE TO STABILISE SURROUNDINGGROUND
4,000,000 1997 DOHA QATAR
H.E.SHK. NAHAYYAN BIN MUBARAK AL NAHAYYAN
REPAIR TO EXISTING HIGH RISE BUILDING TO REFURBISH CONCRETE STRUCTURES
500,000 1996 ABU DHABI
DEPT. OF COMMERCIAL SERVICES AND
BUILDING AFFAIRS
CONCRETE REPAIRS AND REFURBISHMENT OF
HIGH RISE BUILDING
1,479,950 1994 ABU DHABI
PETROSERV LTD. – QATAR UNIVERSITY COMPLETE STRUCTURAL REFURBISHMENT OFUNDERGROUND SERVICE TUNNELS INCLUDINGINJECTION PUMPING THROUGH TUNNELSTRUCTURE TO STABILISE SURROUND
987,750 1994 DOHA, QATAR
GODFREY HEALTH & SPEARING REFURBISH EXISTING PRIVATE VILLA CONCRETESTRUCTURE INCLUDING REPLACEMENT OFFINISHES
237,357 1994 ABU DHABI
096
Actioncrete Page 10 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
GULF DIAGNOSTIC CENTRE STRUCTURAL REPAIRS FOR NEW SPECIALIST CLINIC
2,800,000 1993 ABU DHABI
THE NATIONAL BANK OF ABU DHABI CONCRETE REPAIR WORKS TO G.F. SHOWROOM 184,000 1993 ABU DHABI
AMERADA HESS OIL CORPORATION CONCRETE REPAIR WORKS AT ARZANAH ISLANDTO REFURBISH OVERHEAD PIPELINE SUPPORTS,BUILDINGS AND GROUND STABILISATION AROUNDMANHOLES AND UNDERGROUND SERVICES ANDPIPELINES
797,374 1992 ABU DHABI
SILA HOSPITAL CONCRETE REPAIR WORKS TO EXISTINGBUILDING FOR REFURBISHMENT OF COLUMNS,BEAMS AND SOFFITS INCLUDING REPLACEMENTOF FINISHES
176,500 1992 ABU DHABI
KHALIFA COMMITTEE TOTAL REFURBISHMENT OF 12 STOREY BUILDINGINCLUDING FOUNDATION STABILISATION,CONCRETE REFURBISHMENT OF STRUCTURE,NEW KITCHENS/BATHROOMS AND FINISHES
6,780,950 1992 ABU DHABI
COMMERCIAL BUILDING FOR MR.YOUSUF
A.H.KHOORY
CONCRETE REPAIR AND REFURBISHMENT TO
EXISTING HIGH-RISE BUILDING INCLUDING
GROUND INJECTION TO 4 NO. COLUMNS
1,000,000 1992 ABU DHABI
ABU DHABI HILTON HOTEL STRUCTURAL REPAIR WORKS TO EXISTING HOTEL BUILDING
137,350 1991 ABU DHABI
LAYYAH POWER STATION – ELECTRICITY &
WATER DEPT. SHARJAH
REPAIR AND STABILISATION TO CONCRETE
PLATFORM/FOUNDATIONS TO TURBINE NO.2
325,405 1991 SHARJAH
HEAD OFFICE BUILDING OF AL SHIRAWI REPAIRS TO CONCRETE STRUCTURE 258,152 1991 DUBAI
SILA HOSPITAL STRUCTURAL REPAIRS TO FLOORS BEAMS AND
COLUMNS
201,190 1990 ABU DHABI
LAYYAH POWER STATION – ELECTRICITY & WATER DEPT. SHARJAH
REPAIR AND STABILISATION TO CONCRETE PLATFORM/FOUNDATIONS TO TURBINE NO.4
350,000 1990 SHARJAH
HILTON HOTEL STRUCTURAL REPAIR TO FLOOR, BEAMS AND
COLUMNS
175,584 1990 ABU DHABI
097
Actioncrete Page 11 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
RAS AL KHAIMAH MUNICIPALITY CONCRETE REPAIRS TO COLUMNS IN CHAMBER OF COMMERCE BLDG.
146,000 1990 RAS AL KAIMAH
ABU DHABI AIRPORT GUNITE TO FORM ARTIFICIAL ROCK-FACE FOR
CLIMBING TOWER
139,563 1989 ABU DHABI
NEW THEATRE, ABU DHABI REPAIR TO UNDERGROUND BASEMENT BYINJECTION PUMPING THROUGH STRUCTURE FORSTABILISATION AND CONCRETE REPAIR /WATERPROOFING
254,354 1989 ABU DHABI
DEPT. OF SOCIAL SERVICES & COMM.
BUILDING
CONCRETE REPAIRS AND REFURBISHMENT TO
PENTHOUSE FLAT C23, SECTOR E6
128,202 1989 ABU DHABI
MR.OMEIR BIN MOADDAD CONCRETE REPAIR AND REFURBISHMENT TOBUILDING, INLCUDING REMOVAL/RE-FIXING OFSERVICES/DUCTING AND FINISHES
300,000 1988 ABU DHABI
H.H.SHK.SUROOR BIN MOHD AL NAHAYYAN GROUND STABILISATION BELOW VILLAFOUNDATIONS AND BOUNDARY WALL BYINJECTION TECHNIQUES
950,000 1987 AL AIN
LAYYAH POWER STATION – ELECTRICITY &
WATER DEPT. SHARJAH
CONCRETE REPAIR AND REFURBISHMENT TOUNDERGROUND INTAKE STRUCTURE INCLUDINGSTABILISATION TO SURROUNDING GROUNDAROUND ENTRANCE AREA – PHASE I
438,200 1987 SHARJAH
LAYYAH POWER STATION – ELECTRICITY &
WATER DEPT. SHARJAH
CONCRETE REPAIR AND REFURBISHMENT TOUNDERGROUND DISCHARGE STRUCTUREINCLUDING STABILISATION TO SURROUNDINGGROUND AROUND DISCHARGE AREA – PHASE 2
823,150 1987 SHARJAH
H.E.SHK.BUTTI BIN MAKTOUM AL MAKTOUM DESIGN AND CONSTRUCTION OF TENT-LIKE
MAJLIS USING GUNITE TECHNIQUES
500,000 1987 AL AIN
CHAMBER OF COMMERCE REPAIR TO CHAMBER OF COMMERCE BLDG. 146,000 1987 RAS AL KAIMAH
098
Actioncrete Page 12 of 12
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
H.E.SHK.BUTTI BIN MAKTOUM AL MAKTOUM DESIGN AND CONSTRUCTION OF GUNITE ROOF TO FORM LARGE TENT STRUCTURE
707,155 1987 DUBAI
SHK. MUBARAK BIN MOHD AL NAHYAN GUNITE REPAIR TO STOREROOMS OF SPINNEY’S 303,860 1986 AL AIN
QASCO REPAIR AND WATERPROOFING WORKS TO TUNNELS
4,579,000 1986 DOHA
DEPT. OF COMM. SERVICES AND BLDG.
AFFAIRS
REPAIR TO ABDULLA FARES BUILDING 1,479,950 1985 ABU DHABI
ARABIAN CONSTRUCTION CO. REPAIR TO BASEMENT AT NEW THEATRE 254,354 1985 ABU DHABI
DEPT. OF SOCIAL SERVICES & COMM.
BLDG.
REPAIR TO PENTHOUSE – FLAT C23, SECTOR E6 128,202 1985 ABU DHABI
THE NATIONAL BANK OF ABU DHABI REPAIR WORK BY GUNITE TO SHOWROOM 184,000 1985 ABU DHABI
BIN HAMOODA 5-STOREY UNDERGROUND CAR PARK INJECTION
WORK FOR WATERPROOFING
497,000 1984 DUBAI
OMEIR BIN MOADDAD REPAIR TO BUILDING 300,000 1984 ABU DHABI
P.W.D. UM AL NA SEWAGE PUMPING PLANT 2,700,000 1983 ABU DHABI
ROWAIS AMONIA PLANT - ADCO 176,000 1982 DUBAI
DUTCO HATTA FORT 730,000 1982 HATTA
GODFREY HEATH & SPEARING CONCRETE REPAIR WORKS AT HARAZEEN VILLA 237,357 1981 ABU DHABI
AL SHIRAWI CONT & TRADING CO. REPAIR TO UP-STAND BEAMS 258,152 1981 DUBAI
099
LANDMARKS (EQUINE)
Whether it is an equine pool, underwater treadmill,
surfacing solutions for stables, camel pens, dog
kennels, dairies or design and construction of
riding arenas, all weather track surfaces or turf, we
have the capability to design and construct these
facilities incorporating the most innovative and
progressive designs that come to life with cutting
edge technology.
100
LANDMARKS (EQUINE)
Seamless Rubber Flooring
for stables, kennels, camel
pens and other animal
housing
Equine, camel & race animal
Training Pools &
Hydrotherapy Pools
Race Rails
Paddock Fences
Arena Surfacing
Race Track Surfaces Impact absorbing Wall Mats
for Stables
Rubber Pavers
Stables and Dairy Mats Equine and Camel
Treadmills
Underwater Treadmills
Horse Walkers
Horse Weighbridges
Stable Doors & Windows
Stable Accessories
101
CoatingsPage 1of 4
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
JEBEL ALI RACE COURSE & STABLES HORSE TRAINING POOL AT JEBEL ALI RACE
COURSE & STABLES
1,500,000.00 1994 DUBAI
JEBEL ALI RACE COURSE & STABLES RUBBER FLOORING WORKS TO STABLES 300,000.00 1998 DUBAI
GODOLPHIN / ENGINEER’S OFFICE RUBBER FLOORING WORKS TO AL QUOZ
STABLES
300,000.00 1999 DUBAI
PVT. OFFICE HORSE TRAINING POOL AT AL ASAYL STABLES 2,000,000.00 1999 ABU DHABI
VARIOUS STABLES/ ENGINEER’S OFFICE RUBBER FLOORING WORKS AND IMPACT ABSORBING WALL MATS TO VARIOUS STABLES
12,000,000.00 2000 DUBAI
WORKS DEPARTMENT – ABU DHABI HORSE TRAINING POOL AT WARSA’AN STABLES
2,000,000.00 2001 ABU DHABI
PVT. OFFICE SUPPLY & INSTALLATION OF STABLE FRONTS, WINDOWS, DOORS, GRILLS, ACCESSORIES, RUBBER FLOORING & KERBS TO WALKWAYS & STABLES, PADDOCK FENCING & ARENA SURFACING AT PRIVATE PALACE
1,500,000.00 2002 ABU DHABI
WAVES TRADING AND CONTRACTING W.L.L.
A SELECTION OF LANDMARKS PROJECTS
102
CoatingsPage 2of 4
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
WORKS DEPARTMENT - ABUDHABI RUBBER FLOORING WORKS TO STABLES AT
AL WARSA’AN
1,500,000.00 2002 ABU DHABI
ZABEEL STABLES / ENGINEER’S OFFICE SHOW JUMPING ARENA 93,168.00 2003 DUBAI
SHK. HAMDAN BIN ZAYED PVT OFFICE RUBBER FLOORING WORKS TO STABLES AT AL ARYAM
44,950.00 2003 ABU DHABI
WORKS DEPARTMENT - ABUDHABI RUBBER FLOORING WORKS TO STABLES AT
AL WARSA’AN
92,950.00 2003 ABU DHABI
EMIRATES STUD FARM / ENGINEER’S OFFICE RUBBER FLOORING WORKS AT EMIRATES STUD FARM
511,000.00 2003 HATTA, DUBAI
ENDURANCE VILLAGE REDEVELOPMENT / ENGINEER’S OFFICE
RUBBER FLOORING WORKS AT ENDURANCE VILLAGE, BAB AL SHAMS
324,000.00 2003 DUBAI
ZABEEL STABLES / ENGINEER’S OFFICE RUBBER FLOORING WORKS AT ENDURANCE
VILLAGE, BAB AL SHAMS
112,000.00 2004 DUBAI
GODOLPHIN / ENGINEER’S OFFICE RUBBER FLOORING WORKS AT AL QUOZ STABLES
85,000.00 2004 DUBAI
VARIOUS STABLES/ENGINEER’S OFFICE RUBBER FLOORING WORKS AT VARIOUS STABLES
1,503,159.00 2004 DUBAI
JEBEL ALI RACE COURSE & STABLES RACE RAILS TO RACE TRACK AND RUBBER FLOORING WORKS TO STABLES AND WALKWAYS
457,292.00 2004 DUBAI
DUBAI STABLES/ ENGINEER’S OFFICE RUBBER FLOORING WORKS TO STABLES 119,730.00 2004 ABU DHABI
103
CoatingsPage 3of 4
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
GODOLPHIN/ ENGINEER’S OFFICE RUBBER FLOORING WORKS AT AL QUOZ
STABLES
151,620.00 2004 DUBAI
DESERT STABLES 2 / ENGINEER’S OFFICE RUBBER FLOORING WORKS TO STABLES 386,884.00 2004 DUBAI
VARIOUS STABLES / ENGINEER’S OFFICE 2 NOS HORSE TRAINING POOLS AT NAD AL SHEBA INCLUDING RUBBER WALKWAYS
3,200,000.00 2005 DUBAI
ENDURANCE VILLAGE/ ENGINEER’S OFFICE POROUS RUBBER UNDERLAY FOR
ENDURANCE VILLAGE REDEVELOPMENT
296,800.00 2005 DUBAI
MILLENIUM STABLES/ ENGINEER’S OFFICE RUBBER FLOORING FOR STABLES 198,015.00 2005 DUBAI
GREEN STABLES/ ENGINEER’S OFFICE RUBBER FLOORING FOR STABLES 118,689.00 2005 DUBAI
MILLENIUM STABLES/ ENGINEER’S OFFICE RUBBER FLOORING FOR STABLES 198,015.00 2005 DUBAI
PVT.OFFICE/PRODUCTS FOR PROJECTS RUBBER FLOORING FOR STABLES AT AL JAZAYIR, BAHRAIN
436,262.00 2005 BAHRAIN
PVT. DEPARTMENT HORSE TRAINING POOL AT PALACE STABLES 1,078,956.00 2007 SHARJAH
EMIRATES EQUESTRIAN CENTRE/MEYDAN LLC HORSE WALKER, RUBBER PAVERS, RACE
RAILS AND CONSTRUCTION OF RIDING
ARENAS FOR EMIRATES EQUESTRIAN
CENTRE, BAB AL SHAMS.
1,523,211.00 2008 DUBAI
WARSA’AN STABLES/BIN ALFI GENERAL CONTRACTING
RUBBER FLOORING WORKS TO NEW STABLES 1,861,200.00 2008 ABU DHABI
104
CoatingsPage 4of 4
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
PVT. CLIENT/ENGINEER’S OFFICE TRAINING POOL FOR CAMELS AT NADD AL SHEBA
2,800,000.00 2009 DUBAI
DUBAI ARABIAN STUD / ENGINEER’S OFFICE HORSE TRAINING POOL & RUBBER FLOORING
WORKS AT DUBAI ARABIAN STUD, AL
MARMOOM
2,231,098.00 2009 DUBAI
AL ASIFA STABLES EXTENSION / DUTCO
BALFOUR BEATTY
RUBBER FLOORING WORKS & IMPACT
ABSORBING WALL MATS TO STABLES
532,717.00 2009 DUBAI
PVT. CLIENT/AL AHMADIAH CONTRACTING RUBBER FLOORING WORKS TO CAMEL CLINIC AT WADI AL SAFA
102,500.00 2009 DUBAI
PVT.CLIENT / ENGINEER’S OFFICE ADDITIONAL CAMEL POOL AT NADD AL SHEBA 2,800,000.00 2010 DUBAI
SHARJAH EQUINE HOSPITAL RUBBER FLOORING WORKS AT NEW STABLE
FACILITIES
143,800.00 2010 SHARJAH
Engineer's Office P 191 0900 Arabian Horse Stud-Horse Swimming Pool at Al Marmoom
1,356,190.00 2009 UAE
Engineer's Office Supply & laying 10 mm Equine Rubber Flooringworks including Skirting at Dubai Arabian HorseStud at Al Marmoom
874,908.00 2009 UAE
Engineer's Office FP-2023000005-02 design & construction of DogSwimming Pool and Plant room including testingand commissioning
562,780.00 2010 UAE
105
SPORTS & COATINGS
Decorative (residential/commercial) Resin Flooring:
Areas
Entrance lobby and reception areas
Main corridors
Board rooms
Waiting areas
Access to corporate / administration offices
Cafeteria
Library
Products being proposed
Epoxy terrazzo
Polyurethane Art Floor
106
EIFSPage 1of 3
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
MR. MOHD. SAEED BIN KADFOOR / CITI CONSULT / CJ TEC CONTRACTING DUBAI
SENERGY EIFS FINISHES 179,925 2010 DUBAI
TDIC / LWD ARCHITECTS / KHANSAHEB CIVIL ENGINEERING (ABU DHABI)
SENERGY EIFS FINISHES 1,076,132 2010 ABU DHABI
ELASTOGRAN KANOO POLYURETHANE SYSTEM
/ MODERN CIVIL ENGINEERING CONSULTANCY /
SYSTEM CONTRUCT (DUBAI)
SENERGY EIFS FINISHES 86,050 2010 DUBAI
MINISTRY OF PRESIDENTIAL AFFAIRS / ELITE CONSULTANTS / GREEN PRECAST (AL AIN)
SENERGY EIFS FINISHES 27,780 2010 ABU DHABI
TOURISM DEVELOPMENT & INVESTMENT COMPANY / GHD GLOBAL PVT., LTD. / DHABI CONTRACTING EST. (ABU DHABI)
SENERGY EIFS FINISHES 11,805,262 2010 ABU DHABI
MAJID AL FUTTAIM HOSPITALITY / KHANSAHEB CIVIL ENGINEERING- IBIS HOTEL AT AL RIGGA ROAD
SENERGY EIFS FINISHES 2,949,537 2009 DUBAI
ISHTITMAR BUDGET HOTELS / KHANSAHEB CIVIL ENGINEERING- EASY HOTEL AT JEBEL ALI FREEZONE
SENERGY EIFS FINISHES 1,081,938 2009 DUBAI
BRITISH EMBASSY / JAS ELECTROMECHANICAL
LLC - VISA SECTION EXTENSION
SENERGY EIFS FINISHES 346,533 2009 ABU DHABI
MR. YOUSSEF MOHD. ALI AL NOWAIS / SHAPOORJI PALLONJI- CENTRO HOTEL AT BARSHA
SENERGY EIFS FINISHES 575,520 2009 DUBAI
BRITISH COUNCIL / HENNESSEY LLC SENERGY EIFS FINISHES 58,206 2009 DUBAI
MUBADALA / AL HABTOOR MURRAY & ROBERTS– SORBONNE UNIVERSITY
SENERGY EIFS FINISHES 1,321,323.50 2009 ABU DHABI
WAVES TRADING AND CONTRACTING W.L.L.
A SELECTION OF EIFS PROJECTS
107
EIFSPage 2of 3
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
TERNA S. A. - ROTANA COMPLEX NEAR KHALIFA PARK
SENERGY EIFS FINISHES 122,250 2009 ABU DHABI
ALDAR PROPERTIES PJSC / ALDAR LAING O’ROURKE – AL ZEINA PA610 AL RAHA BEACH
SENERGY EIFS FINISHES 85,585,506 2009 ABU DHABI
TRANSEMIRATES CONTRACTING/ DUBAI SPORTS CITY
SENERGY EIFS FINISHES 863,970 2008 DUBAI
MAJID AL FUTTAIM / KHANSAHEB CIVIL
ENGINEERING - EAST HOTEL
SENERGY EIFS FINISHES 13,552,677 2008 DUBAI
ZAABEEL INVESTMENT / LAING O’ROURKE -DUBAWI ISLAND RESORT DEVELOPMENT AT PALM JUMEIRAH
SENERGY EIFS FINISHES 237,500 2008 DUBAI
DUBAI REAL ESTATE CORPORATION / TEST CONTRACTING - HATTA STAFF ACCOMMODATION
SENERGY EIFS FINISHES 1,787,085 2008 HATTA
ALDAR PROPERTIES / NATIONAL WHEEL J & P -
YAS ISLAND AT ROTANA & CENTRO HOTEL
SENERGY EIFS FINISHES 1,365,000 2008 ABU DHABI
DUBAI SPORTS CITY / TRAMSEMIRATES CONTRACTING / DUBAI SPORTS CITY ACADEMIES SITE
SENERGY EIFS FINISHES 863,970 2008 DUBAI
MAJID AL FUTTAIM / KHANSAHEB CIVIL ENGINEERING / EAST HOTEL
SENERGY EIFS FINISHES 13,552,677 2008 DUBAI
AL DAR PROPERTIES PJSC / DEWAN / AL FUTTAIM CARILLION / MARINA HOTEL AT YAS ISLAND
SENERGY EIFS FINISHES 2,297,736 2008 ABU DHABI
108
EIFSPage 3of 3
CLIENT / CONTRACTOR DESCRIPTION VALUE in AED YEAR AREA
AL FUTTAIM CARILLION LLC SENERGY EIFS FINISHES 84,630 2007 DUBAI
AL NABOODAH LAING O'ROURKE /
ATLANTIS THE PALM PACKAGE ROYAL TOWER
SENERGY EIFS FINISHES 7,029,000 2006 DUBAI
109
SPORTS & COATINGS
Functional (Industrial) Resin Flooring:
Plant rooms
Electric rooms
Mechanical labs
Electronic and robot labs
Storage areas
Electronic library
Utility rooms
Car park areas
Lift wells
Water tanks
Roof water proofing
Wet area waterproofing
Dust proofing
110
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
BELHASA ENGINEERING & CONTRACTING CAR PARK FLOORING 191,305.00 2008 SHARJAH
BESIX / AL DAR PROPERTIES EPOXY COATING 3,636,885.00 2008 ABU DHABI
DUBAI CONTRACTING COMPANY / PALM VACATION CLUB
TRAFFIC COATING 2,791,381.00 2008 DUBAI
KHANSAHEB CIVIL ENGINEERING / BAKER HUGHES
EPOXY FLOORING 132,638.00 2008 DUBAI
AL FIRAS GENERAL CONTRACTING / HIGHER CORPORATION
PROTECTIVE COATING 172,000.00 2008 ABU DHABI
TRANSEMIRATES CONTRACTING/ DUBAI SPORTS CITY
SENERGY EIFS FINISHES 863,970.00 2008 DUBAI
DUBAI CONTRACTING COMPANY / H. H. SHEIKHA
MARYAM
TRAFFIC COATING 763,107.00 2008 DUBAI
SEIDCO GENERAL CONTRACTING / MR. SAEED AL GHOBASH
CAR PARK FLOORING 235,057.00 2008 ABU DHABI
ASCON / DUBAI PROPERTIES TRAFFIC COATING 707,057.00 2008 DUBAI
FIRST GULF BANK / BELHASA ENGINEERING &
CONTRACTING COMPANY LLC
TRAFFIC COATING 413,150.00 2008 DUBAI
BHATIA GENERAL CONTRACTING EPOXY COATING 424,600.00 2008 DUBAI
ALI & SONS CONTRACTING EPOXY COATING 322,584.00 2008 ABU DHABI
AL DAR / TAISEI CORPORATION ANTI CARBONATION PROTECTIVE
COATING
2,791,479.00 2008 ABU DHABI
BELHASA ENGINEERING & CONTRACTING COMPANY LLC
EPOXY COATING 219,722.00 2008 DUBAI
WAVES TRADING AND CONTRACTING W.L.L.
A SELECTION OF COATING PROJECTS
111
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
NAKHEEL / TAISEI CORPORATION TRAFFIC COATING 9,567,950.00 2008 DUBAI
AL NABOODAH CONTRACTING - CANAL POINT HOSPITAL
TRAFFIC DECK COATING 1,548,569.00 2008 DUBAI
HILTON ABU DHABI UCRETE FLOORING 411,615.00 2008 ABU DHABI
AL NABOODAH LAING O’ ROURKE- – JUMEIRAH GOLF ESTATE
FLOOR COATING 220,522.50 2008 DUBAI
FIBREX – THINET JV - BUILDING MATERIALS CITY TRAFFIC COATING 2,701,883.50 2008 ABU DHABI
MUBADALLA DEVELOPMENT CO. / OGER DUBAI -
AL AIN UNIVERSITY PPP PROJECT CRESCENT
BUILDING # 6
TRAFFIC COATING 784,760.00 2008 AL AIN
MAJID AL FUTTAIM / KHANSAHEB CIVIL ENGINEERING - EAST HOTEL
SENERGY EIFS FINISHES 13,552,677.00 2008 DUBAI
ZAABEEL INVESTMENT / LAING O’ROURKE -DUBAWI ISLAND RESORT DEVELOPMENT AT PALM JUMEIRAH
SENERGY EIFS FINISHES 237,500.00 2008 DUBAI
THE PALM VACATION CLUB / DUBAI
CONTRACTING COMPANY- THE FAIRMONT PALM
HOTEL AND RESORT ON PLOT H6
TRAFFIC COATING 815,512.50 2008 DUBAI
AL BARSHA REAL ESTATE / PIVOT ENGINEERING FLOOR COATING 318,052.00 2008 DUBAI
SOROUH REAL ESTATE PJSC / ARABIAN CONSTRUCTION COMPANY- SHAMS ABU DHABI DEVELOPMENT TOWER 1, 2 & PODIUM AT REEM ISLAND
PROTECTIVE COATING 3,563,091.00 2008 ABU DHABI
DUBAI REAL ESTATE CORPORATION / TEST
CONTRACTING - HATTA STAFF
ACCOMMODATION
SENERGY EIFS FINISHES 1,787,085.00 2008 HATTA
DEPARTMENT OF PRESIDENTIAL AFFAIRS / AL HABTOOR & CCC JOINT VENTURE
TRAFFIC COATING AND ANTI CARBONATION COATING
3,556,000.00 2008 ABU DHABI
GLOBAL VILLAGE / AL NABOODAH CONTRACTING EPOXY TERRAZZO / STONE CARPET 13,092,935.00 2008 DUBAI
112
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
DUBAI METRO / ASCON - RASHIDIYA CAR PARK TRAFFIC COATING 2,690,859.00 2008 DUBAI
ALDAR PROPERTIES / NATIONAL WHEEL J & P -YAS ISLAND AT ROTANA & CENTRO HOTEL
SENERGY EIFS FINISHES 1,365,000.00 2008 ABU DHABI
ALDAR PROPERTIES / AL FUTTAIM CARILLION-MARINA HOTEL AT YAS ISLAND
TRAFFIC & PROTECTIVE COATING, SENERGY EIFS FINISHES
2,297,736.00 2008 ABU DHABI
SIEMENS / FORCE 10 UAE LTD.- SIEMENS TRANSFORMER PRODUCTION PLANT & OFFICE IN MUSAFFAH
TRAFFIC COATING 210,250.00 2008 ABU DHABI
FIRST GULF BANK / SEIDCO GENERAL
CONTRACTING- THREE OFFICE TOWERS AT
PLOTS C87, 88 & 115
TRAFFIC COATING 166,250.00 2008 ABU DHABI
ALDAR PROPERTIES / J & P - INTERCHANGE 4, 5& 6 AL RAHA BEACH DEVELOPMENT
PROTECTIVE COATING 1,680,000.00 2008 ABU DHABI
MAJID AL FUTTAIM HOSPITALITY / KHANSAHEB CIVIL ENGINEERING- IBIS HOTEL AT AL RIGGA ROAD
SENERGY EIFS FINISHES 2,949,537.00 2009 DUBAI
DIAMOND INVESTMENT/ BELHASA ENGINEERING-
MARINA DIAMOND 7
TRAFFIC COATING 188,059.00 2009 DUBAI
ISHTITMAR BUDGET HOTELS / KHANSAHEB CIVIL ENGINEERING- EASY HOTEL AT JEBEL ALI FREEZONE
SENERGY EIFS FINISHES 1,081,938.00 2009 DUBAI
DAMAC PROPERTIES / ARCHON ENGINEERING &
CONSULTANTS- XL TOWER AND BUSINESS
TOWER AT BUSINESS BAY
TRAFFIC COATING 1,379,809.00 2009 DUBAI
INTERNATIONAL CAPITAL TRADING / SEIDCO GENERAL CONTRACTING- SILVER WAVE TOWER ON PLOT NO. C-51 SECTOR G-14 AT AL MARINA
TRAFFIC COATING 353,700.00 2009 ABU DHABI
BRITISH EMBASSY / JAS ELECTROMECHANICAL
LLC - VISA SECTION EXTENSION
SENERGY EIFS FINISHES 346,533.00 2009 ABU DHABI
MARS PROPERTIES / BHATIA GENERAL CONTRACTING- OFFICE/COMMERCIAL BUILDING
TRAFFIC COATING 178,896.00 2009 DUBAI
113
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
AT DUBAI MEDIA CITY
ALDAR PROPERTIES / SIX CONSTRUCT CO. -FREEWAY CROSSING – SHAHAMA SADDIYATFREEWAY PHASE 2
ANTI CARBONATION COATING 2,800,103.00 2009 ABU DHABI
TRIDENT INTERNATIONAL HOLDINGS / CSHK DUBAI CONTRACTING- TRIDENT GRAND RESIDENCES
TRAFFIC COATING 1,196,867.00 2009 DUBAI
MODERN RESIDENTIAL CITY / SEIDCO GENERALCONTRACTING- MODERN RESIDENTIAL CITY ATMUSAFFAH
PROTECTIVE COATING 2,974,005.00 2009 ABU DHABI
LEGENDS REAL ESTATE / BIN LADIN CONTACTING GROUP - SALEMIYAH TOWER ON PLOT NO. 125-133
TRAFFIC COATING 194,468.00 2009 DUBAI
AL QUDRA / NPC- DANAT MALL ON PLOT NO. 60 PROTECTIVE COATING 361,750.00 2009 ABU DHABI
MR. YOUSSEF MOHD. ALI AL NOWAIS /
SHAPOORJI PALLONJI- CENTRO HOTEL AT
BARSHA
SENERGY EIFS FINISHES 575,520.00 2009 DUBAI
GOVERNMENT OF DUBIA CIVIL AVIATION / HADEED EMIRATES CONTRACTING - JEBEL ALI AIRPORT CITY PHASE 1A CONTRACT NO.JXB1/DB/200
PERFORMANCE FLOORING 921,990.00 2009 DUBAI
ZAYED BIN SULTAN / ALI AND SONS CONTRACTING- AL NAHIYAN CHARITABLE & HUMANITARIAN FOUNDATION
TRAFFIC COATING 99,000.00 2009 ABU DHABI
TERNA S. A. - ROTANA COMPLEX NEAR KHALIFA PARK
SENERGY EIFS FINISHES 122,250.00 2009 ABU DHABI
EASA SALEH AL GURG REAL STATE DIVISION / KHANSAHEB CIVIL ENGINEERING- AL GURG TOWER 3 ON PLOT NO. 125-117
TRAFFIC COATING 650,291.25 2009 DUBAI
MR. AHMED BIN HAIDER AL MERAIKHI / AL MERAIKHI GENERAL CONTRACTING- COMM.
TRAFFIC COATING 194,509.00 2009 DUBAI
114
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
BLDG. ON PLOT NO. 125-124 B-228 AT REGGA AL BUTTEN
AL HABTOOR MURRAY & ROBERTS -SORBONNEUNIVERSITY AL REEM ISLAND DTZ TERRAZO
EPOXY TERRAZO 4,256,110.00 2009 DUBAI
MUBADALA / AL HABTOOR MURRAY & ROBERTS –SORBONNE UNIVERSITY
SENERGY EIFS FINISHES 1,321,323.50 2009 ABU DHABI
MR. ZUHAIR AL HABIB / ALI & SONS CONTRACTING – 2 NOS. IDENTICAL RESIDENTIAL BUILDING ON PLOT RC-C005 & RC-C-006
EPOXY COATING 366,113.50 2009 DUBAI
ADNEC / RMJM / ARABTEC – ABU DHABI
NATIONAL EXHIBITION CENTER
PROTECTIVE COATING 553,250.00 2009 ABU DHABI
AL TAYERS MOTORS / ARKITEKNEK INTERNATIONAL / AL TAYER STOCKS LLC –G+M+ROOF WORKSHOP & HOLDING AREA M-15 AT MUSSAFFAH
PROTECTIVE COATING 506,430.00 2009 ABU DHABI
ADEWA / CODE CONTRACTING – SENIOR STAFF ACCOMMODATION
TRAFFIC COATING 259,077.00 2009 ABU DHABI
DAFZA/ AL GURG CONSULTANT / ASCON – P20
WEST OFFICE BUILDING W-7
TRAFFIC AND EPOXY COATING 624,896.00 2009 DUBAI
MR. SAEED AHMED GHOBASH / BADRI & BENSOUDA / BELHASA ENGINEERING –3B+G+M+3 BUILDING ON PLOT 221-132 GHOBASH OFFICE
TRAFFIC AND EPOXY COATING 397,261.00 2009 DUBAI
DUBAI WORLD TRADE CENTER / DAR AL HANDASAH / KHANSAHEB CIVIL ENGINEERING –NEW EXHBITION HALL AT DUBAI WORLD TRADE CENTER
EPOXY COATING 812,926.00 2009 DUBAI
115
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
TOURISM & DEVELOPMENT INVESTMENT CO. / AEDAS / ALEC – CULTURAL VILLAGE AT SAADIYAT ISLAND
EPOXY COATING 891,000.00 2009 ABU DHABI
ABU DHABI NATIONAL HOTELS / OTAK / AL
HABTOOR ENGINEERING – JW MARRIOTT ABU
DHABI RESORT & SPA SITE 276
FLOOR COATING 889,470.00 2009 ABU DHABI
ALDAR PROPERTIES PJSC / ALDAR LAING O’ROURKE – AL ZEINA PA610 AL RAHA BEACH DEVELOPMENT
SENERGY EIFS FINISHES 85,585,506.00 2009 ABU DHABI
ALDAR / EMIRATES LINK MALTAURO CAR PARK COATING AT BANIYAS TOWER 649,134.00 2009 ABU DHABI
MAF INVESTMENTS / KHANSAHEB CIVIL ENGINEERING
EAST HOTEL MALL OF THE EMIRATES 290,339.00 2010 DUBAI
DUBAI CUSTOMS / SYSTEM CONSTRUCT DESIGN, SUPPLY, DELIVERY & ERECTION OF G+4+ROOF CAR PARK & G+3 TRAINING CENTER PRECAST BUILDINGS AT MINA AL RASHID
593,363.00 2010 DUBAI
TAMOUH / CSHK DUBAI CONTRACTING RT-3-C15 MIXED DEVELOPMENT CITY OF LIGHT AT AL REEM ISLAND
837,597.00 2010 ABU DHABI
RTA / DHABI CONTRACTING DUBAI METRO PROJECT AL QUSAIS CAR PARK GREENLINE
3,999,681.00 2010 DUBAI
MUBADALLA DEVELOPMENT / OGER ABU DHABI FINANCIAL CENTRE (SOWWAH
SQUARE)
8,727,668.00 2010 ABU DHABI
BIN LADIN REAL ESTATE / BIN LADIN CONTRACTING COMPANY
LEGENDS PLAZA ON PLOT 125-170, RIGGA AL BUTEEN
190,000.00 2010 DUBAI
116
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
MR. MOHD. SAEED BIN KADFOOR / CJ TEC
CONTRACTING
B+G+1 VILLA SERVICE BLOCK GUARD ROOM AT PLOT NO. 261-922 MUHAISNAH FIRST
179,925.00 2010 DUBAI
MR. AYAD HASSAN AL HABSHI / ENGINEERING
CONSORTIUM GROUP
RESIDENTIAL BUILDING ON PLOT NO. C-005-029 AT TECOM
125,829.00 2010 DUBAI
YAHSAT / ALLYRA LH ENGINEERING CONS. / AL HABTOOR LSG LLC
YAHSAT AL YAH SATTELITE COMMUNICATIONS
654,858.75 2010 ABU DHABI
MR. MOHD. BIN J.R. AL BADIE AL DHAHIRI / LWD ARCHITECTS / POLENSKY & ZOELLENER
CENTRO HOTEL AT AIRPORT ROAD ABU DHABI
182,802.00 2010 ABU DHABI
TDIC / LWD ARCHITECTS / KHANSAHEB CIVIL ENGINEERING
SAADIYAT BRANDED BEACH CLUB 1,076,132.00 2010 ABU DHABI
MR. HAMOODAH BIN ALI BIN HAMOODAH / DEWAN AL EMARA ARCH & ENG / BIN HARMAL CONTRACTING AND IRRIGATION EST. (ABU DHABI)
AL MURJAAN TOWER AT PLOT C-45 SEC
NO. E4/01
114,392.50 2010 ABU DHABI
ALDAR PROPERTIES / BREWER SMITH BREWER GULF / AL FUTTAIM CARILLION (ABU DHABI)
IKEA STORE PHASE II, ZONE 1, YAS ISLAND 1,439,131.00 2010 ABU DHABI
AL TAYER MOTORS / ARIF BINTOAK / AL TAYER STOCKS (RAS AL KHAIMAH)
WATERPROOFING OF ROOF AL TAYER MOTORS RAS ALA KHAIMAH
146,800.00 2010 DUBAI
MUBADALA / AEDAS LIMITED / SIX CONSTRUCT –
SAMSUNG JV (ABU DHABI)
CLEVELAND CLINIC DTZ FLOORING 253,148.00 2010 ABU DHABI
MUBADALA / COX INTERNATIONAL / AL FUTTAIM CARILLION LLC (AL AIN)
UAE UNIVERSITY NEW CAMPUS PPP DEVELOPMENT
236,068.00 2010 ABU DHABI
117
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
MUHAMMAD ABDULLA JUMA HUMAIDAN AL FALASI / AL AJMI ENGINEERING CONSULTANTS / DELATA EMIRATES CONTRACTING COMPANY (DUBAI)
TYPICAL OFFICE BUILDING ON PLOT NO. 373-1307 AT BARSHA
310,450.00 2010 DUBAI
DOPA / ARCHON / ASCON (ABU DHABI) CONSTRUCTION OF PALACE AT RUWAIS 279,445.00 2010 ABU DHABI
ADNOC / AL TORATH ENGINEERING CONSULTANTS / SYSTEM CONSTRUCT
RUWAIS HOUSING COMPLEX PHASE 3 MARRIED STAFF ACCOMMODATION
537,443.00 2010 ABU DHABI
ADNOC / ENGINEER CONSULTANT / ASCON EPOXY COATING WORKS AT BOROUGE INNOVATION CENTRE / NITOFLOR FC150 / NITOFLOR TF 5000/ SKIRTING
590,717.00 2010 ABU DHABI
MR. MOHAMMED JUMA SAEED AL NABOODAH / AL MAKHAN CONSULTANT / AL NABOODAH GYPSUM 7 MARBLE PRODUCTS LLC
AL NABOODAH SHOWROOMS AND WORKSHOP PLOT NO. M-28 MUSAFFAH / MASTERTOP 1210 CP / MASTERTOP 1120T
297,000.00 2010 ABU DHABI
MAG ME PROPERTY SOLUTIONS / DESIGN
CENTRE ARCHITECTS & ENGINEERS
CONSULTANT / MAG CONTRACTING COMPANY
2B+G+7+GYM BUILDING ON PLOT NO. 317-1071 AT MANKHOOL DUBAI / MASTERTOP1331
147,182.00 2010 DUBAI
MR. KHALEED AL ATTAR / ENG ADNAN SAFFARINI
/ TRANSEMIRATES CONTRACTING
B+G+31+4 SERVICE FLOOR TOWER AT SHEIKH ZAYED ROAD / MASTERTOP 1210CP / LINE MARKING
337,364.00 2010 DUBAI
MIRK GENERAL TRADING / EVAN LIM-PENTA CONSTRUCTION
PALM JUMEIRAH SOFITEL HOTEL / MASTERTOP 300H
1,086,500.00 2010 DUBAI
TOURISM DEVELOPMENT & INVESTMENT COMPANY / GHD GLOBAL PRIVATE LIMITED / DHABI CONTRACTING ESTABLISHMENTS
SAADIYAT BEACH APARTMENTS AT SAADIYAT ISLAND PLOT NO. SB19 ABU DHABI MAIN WORKS – EIFS
11,805,262.00 2010 ABU DHABI
EMIRATES REAL ESTATE CORPORATION / AL SUWEIDI ENGINEERING CONSULTANTS / DHABI CONTRACTING (ABU DHABI)
3B+G+10 BUILDING MINISTRY OF FINANCE BUILDING FOR INDEPENDENT AUTHORITIES ON PLOT NO. P-4 SECTOR E-11
349,000.00 2010 ABU DHABI
118
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
AL TAYER MOTORS / ARKITEKNIK
INTERNATIONAL / AL TAYER STOCKS LLC
AL TAYER MOTOR SHOWROOOM &
WORKSHOP
321,600.00 2010 ABU DHABI
DUBAI CHAMBER OF COMMERCIAL & INDUSTRIAL/ BLUEHAUS / HIGHGATE INTERIORS DESIGN
REFURBISHMENT OF DUBAI CHAMBER OF COMMERCIAL & INDUSTRIAL BUILDING
602,360.00 2011 DUBAI
ARIF & BINTOAK / KHANSAHEB CIVIL ENGINEERING
FLOOR COATING WORKS FOR THE DUBAI RULER’S COURT
135,410.00 2011 DUBAI
ALDAR LAING O’ROURKE JV / WATERMAN EMIRATES CONSULTING ENGINEERS AND FACILITY MANAGERS / AL FUTTAIM CARILLION
AL MUNEERA PROJECTS – EIFS 2,888,0000.00 2011 ABU DHABI
TDIC / SPACEMAKER LLC SITE COMPOUND & OFFICES FOR LOUVREMUSEUM & ZAYED NATIONAL MUSEUM ATSAADIYAT ISALAND – EIFS
329,700.00 2011 ABU DHABI
DEAPRTMENT OF TRAFFIC / BHP POOL DIVISION FLOOR COATING WORKS FOR MUSANADA PROJECTS
445,500.00 2011 ABU DHABI
FARM FRESH / JAROS CONSULTANT / HORIZON
CONTRACTING COMPANY
PROPOSED CONSTRUCTION OF FOODPROCESSING & LOGISTIC CENTRE ONPLOT NO. 597-657 DIP
156,500.00 2011 DUBAI
119
SPORTS & COATINGS
Sports Floorings and Facilities:
Multi-purpose indoor sports hall flooring
Athletic running tracks
Jogging tracks
Multi-purpose outdoor sports flooring
Tennis courts
Sports hall seating
Football / Rugby fields
Cricket pitches
Chain link fencing
Field lighting
Bicycle tracks
Field and track maintenance
Systems:
Polyurethanes
Polyurethanes + Rubber
Acrylics
Artificial grass
120
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
HASSANESCO TRADING & CONTRACTING WLL SPORTS FLOORING WORKS FOR POLICE TRAINI NG INSTITUTE
QAR 1,260,650.00 2013 QATAR
M/S.LOTUS TRADING & CONTRACTING SUPPLY & INSTALLATION OF SPORTS EQUIPMENTS WORKS
FOR CONSTRUCTION OF FOUR (4) NEW SCHOOLS PROJECTQAR 464,932.00 2014 QATAR
M/S.QATAR POWER CONSTRUCTION SUPPLY & INSTALLATION OF SPORTS FLOORING WORK AT DOHA ACADEMY
QAR 400,000.00 2014 QATAR
QATAR ARMED FORCES SPORTS FLOORING WORK FOR MILITATY SPORTS HALL AT SUHAILIYAT CAMP
QAR 219,723.00 2014 QATAR
M/S.LOTUS TRADING & CONTRACTING SUPPLY & INSTALLATION OF SPORTS FLOORINGWORKS FOR CONSTRUCTION OF AL-THAMEED - PIN# 51650528 PACKAGE-2
QAR 1,523,880.00 2014 QATAR
M/S.LOTUS TRADING & CONTRACTING SUPPLY & INSTALLATION OF SPORTS FLOORINGWORK FOR CONSTRUCTION OF AL-THAMEED - PIN# 51650884 PACKAGE-2
2014 QATAR
M/S.LOTUS TRADING & CONTRACTING SUPPLY & INSTALLATION OF SPORTS FLOORINGWORK FOR CONSTRUCTION OF RAWDAT AL HAMAMA- PIN# 70100738
PACKAGE-2
2014 QATAR
M/S.LOTUS TRADING & CONTRACTING SUPPLY & INSTALLATION OF SPORTS FLOORINGWORKS FOR CONSTRUCTION OF RAWDAT AL HAMAMA- PIN# 70210905
PACKAGE-2
2014 QATAR
M/S.INTERNATIONAL TRADING & CONTRACTING SUPPLY & INSTALLATION OF SQUASH COURT AT 36 VILLA AND CLUBHOUSE FOR HUSSAM ABDUL SALAM ISSA AT UMM SALAL
QAR.120,409.00 2014 QATAR
ASPIRE LOGISTICS PVC SPORTS FLOORING FOR INDOOR TENNIS COURT AT LADIES CLUB ASPIRE ZONE
QAR 263,542.00 2014 QATAR
WAVES TRADING AND CONTRACTING W.L.L.
A SELECTION OF SPORTS SURFACING PROJECTS
121
M/S.JORDANIAN SCHOOL SUPPLY & INSTALLATION OF POLYTAN SPORTS SURFACE
SYSTEM WITH SURFACE GRINDING WORK AT JORDANIANQAR.62,000.00 2014 QATAR
M/S.HASSANESCO TRADING & CONTRACTING WLL. SUPPLY AND INSTALLATION OF INDOOR SPORTS FLOORING WORK GENERAL GUARDS DEPARTMENT AT SALWA
QAR.57,100.00 2014 QATAR
M/S.AL JABER TRADING & CONT. CO W.L.L (JTC) SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS
SURFACES & EQUIPMENT WORK. AT PRIMARY SCHOOL FOR BOYS AT ONAIZA PIN # 65057264 PACKAGE-6 STAGE-9
QAR.1,394,000.00 2015 QATAR
M/S.AL JABER TRADING & CONT. CO W.L.L (JTC) SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTSSURFACES & EQUIPMENT WORK AT SECONDARY SCHOOLFOR GIRLS AT RUWAIS PIN # 79050721 PACKAGE-6 STAGE-9
2015 QATAR
M/S.AL JABER TRADING & CONT. CO W.L.L (JTC) SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS SURFACES & EQUIPMENT WORK AT SECONDARY SCHOOL FOR
GIRLS AT SHAHANIYA PIN # 80230572 PACKAGE-6 STAGE-9
2015 QATAR
M/S.AL HUDA ENGINEERING WORKS SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS URFACES & EQUIPMENT WORK AT PIN-56371287-UMM AL
SANEEM # 2 PACKAGE -3 STAGE-9
QAR.1,477,074.00 2015 QATAR
M/S.AL HUDA ENGINEERING WORKS SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS
URFACES & EQUIPMENT WORK AT PIN-56381951-UMM AL SANEEM # 3 PACKAGE -3 STAGE-9
2015 QATAR
M/S.AL HUDA ENGINEERING WORKS SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS
URFACES & EQUIPMENT WORK AT PIN-56381986-UMM AL SANEEM #1 PACKAGE -3 STAGE-9
2015 QATAR
M/S.AMANA QATAR CONTRACTING.CO. SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS URFACES & EQUIPMENT WORK AT AL KABAAN 1 PIN #
75570071 PACKAGE -4 STAGE 09.
QAR.2,286,914.00 2015 QATAR
M/S.AMANA QATAR CONTRACTING.CO. SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS URFACES & EQUIPMENT WORK AT AL KABAAN 2 PIN #
75570073 PACKAGE -4 STAGE 09.
2015 QATAR
M/S.AMANA QATAR CONTRACTING.CO. SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS URFACES & EQUIPMENT WORK AT AL THAKIRA PIN #
75010588 PACKAGE -4 STAGE 09.
2015 QATAR
M/S.AMANA QATAR CONTRACTING.CO. SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS URFACES & EQUIPMENT WORK AT AL KARANA PIN #
830961331 PACKAGE -4 STAGE 09.STAGE 09.
2015 QATAR
122
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
M/S.AMANA QATAR CONTRACTING.CO. SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS EQUIPMENT WORK AT AL RAYYAN ATHIKA & SAKINA
PACKAGE -2 STAGE 09.STAGE 09.
QAR.302,112.00 2015 QATAR
M/S.AMANA QATAR CONTRACTING.CO. SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS EQUIPMENT WORK AT UMM SALAMA AT WAJBA # 1 PACKAGE
-2 STAGE 09.STAGE 09.
2015 QATAR
M/S.AMANA QATAR CONTRACTING.CO. SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS EQUIPMENT WORK ATHALIMA SCHOOL AT WAJBA # 2
PACKAGE -2 STAGE 09.STAGE 09.
2015 QATAR
M/S.AMANA QATAR CONTRACTING.CO. SUPPLY & INSTALLATION OF INDOOR /OUTDOOR SPORTS EQUIPMENT WORK AT AL SAAD BIN ABI WAQAS SCHOOL AT
WAJBA # 3 PACKAGE -2 STAGE 09.STAGE 09.
2015 QATAR
TADMUR CONTRACTING & TRADING SUPPLY OF CONICA MATERIALS 233,150.00 2008 QATAR
ORIENT IRRIGATION SERVICES JOGGING TRACK 326,491.00 2008 DUBAI
DUBAI AVIATION CLUB REFURBISHMENT OF EXISTING TENNIS COURTS 180,023.00 2008 DUBAI
RAFFLES INTERNATIONAL SCHOOL SUPPLY OF LIGHTING SYSTEM 202,500.00 2008 DUBAI
AMERICAN EMBASSY SUPPLY OF DECO MATERIALS 92,995.00 2008 KENYA
AL HAMAD CONTRACTING SUPPLY OF CONIPUR MATERIALS 869,130.00 2008 IRAQ
RELIANCE SPORTS SUPPLY OF CONIPUR MATERIALS 381,765.00 2008 DUBAI
EMIRATES ROADS CONTRACTING / RTA JOGGING TRACK 2,529,840.00 2008 DUBAI
ALDAR MIMAR FOR ENGINEERING PETROJECT YNLG PROJECT – SUPPLY & INSTALLATION OF
RUBBER FLOORING FOR PLAY
AREAS
286,800.00 2008 YEMEN
123
EVOLVENCE CAPITAL REPTON SCHOOL - ARTIFICIAL GRASS FIELDS 2,752,929.00 2008 DUBAI
EVOLVENCE CAPITAL REPTON SCHOOL – CLASSROOM VERANDAH SUPPLY &
INSTALLATION OF RUBBER FLOORING135,160.00 2008 DUBAI
DUTCO BALFOUR BEATTY R-895 ROAD WORKS FOR AL HAIL ISLAND –JOGGING TRACK
1,585,220.00 2008 DUBAI
EVOLVENCE CAPITAL REPTON SCHOOL – CHILDREN’S PLAYGROUND –CENTRAL AREA
203,055.00 2008 DUBAI
TULIPA LANDSCAPING LLC LIBERTY HOUSE – JOGGING TRACK 118,795.00 2008 DUBAI
H.H. SHEIKH HAMDAN RUBBER FLOORING FOR JOGGING TRACK AT AL YASSAT ISLAND
2,588,000.00 2008 ABU DHABI
DUBAI MUNICIPALITY / AL BAYADER PJ9164 POND PARK AT AL BARSHA 2 JOGGING TRACK – DECO 5
1,027,800.00 2008 DUBAI
H.H. SHEIKH HAMDAN / PORT SAEED TRANSPORT AND BUILDING CONTRACTING
JOGGING TRACK FOR H.H. SHEIKH HAMDAN MAJLIS– CONIPUR 2S MODIFIED
454,680.00 2008 DUBAI
ENGINEER’S OFFICE SAFA VILLA / JOGGING TRACK – CONIPUR 2S 495,539.00 2008 DUBAI
AJMAN UNIVERSITY ARTIFICIAL GRASS FOR FOOTBALL FIELD & ACRYLIC
SURFACING FOR MULTIPURPOSE COURT
– DECO 5, FR50, FENCE, LIGHTING, ACCESSORIES
2,550,000.00 2008 AJMAN
BASRA UNIVERSITY / AL HAMAD CONTRACTING BASRA UNIVERSITY – INDOOR SYSTEM SUPPLY ONLY –CONIPUR HG
218,486.00 2008 IRAQ
ENGINEER’S OFFICE AL QAFFAY ISLAND / JOGGING TRACK / CIVIL WORKS –CONIPUR 2S MODIFIED
3,065,000.00 2008 DUBAI
DUBAI AVIATION CLUB RESURFACING OF CENTRE COURT 1-9 DECOCOLOR
186,795.00 2008 DUBAI
DIRECTOR ART CULTURE SPORTS OF YOUTH AFFAIRS
SUPPLY OF SPORTS FLOORING MATERIALS –CONIPUR 210
133,964.00 2008 INDIA
DUBAI MUNICIPALITY / CANSULT MAUNSELL / ARCO GROUP
AL QUSAIS 2 PARK PJ9136 / CONIPUR 2S MODIFIED / DECOCOLOR
181,391.00 2009 DUBAI
GOVERNMENT OF IRAQ / AL HAMAD CONTRACTING AL SAMAWA STADIUM IRAQ SUPPLY OF RUBBER FLOORING FOR BASKETBALL
148,313.00 2009 IRAQ
OTTOMAN PALACE / KURSAT AYABAK ARCH / ZSML CONSTRUCTION
RIXOS OTTOMAN PALACE HOTEL AND VILLA / CONIPUR EPDM 10MM
759,756.00 2009 DUBAI
124
DUBAI MUNICIPALITY / CANSULT MAUNSELL / ARCO GROUP
ABU HAIL NEIGHBOURHOOD PARK PJ 9136/4A CONIPUR 2S DECOCOLOR
162,260.00 2009 DUBAI
AL DAR MIMAR FOR ENGINEERING MAHARAH CITY – INDOOR SPORTS HALL 232,560.00 2009 YEMEN
ROADS AND TRANSPORT AUTHORITY REMEDIAL REINSTATEMENT OF JOGGING TRACK SAFA PARK / CONIPUR ESW
277,229.00 2009 DUBAI
DUBAI MUNICIPALITY / MIRAK IRRIGATION SUPPLY AND INSTALLATION OF RUBBER FLOORING FOR JOGGING TRACK AND ACRYLIC SURFACING
FOR SPORTS COURTS / CONIPUR 2S, DECOTURF
447,592.00 2009 DUBAI
BRADENTON SCHOOL / GAJ / GREGORI INTERNATIONAL
BRADENTON SCHOOL AT DSC / CONIPUR 2S 40+10 245,376.00 2009 DUBAI
MONDO CONSTRUCTION COMPANY SUPPLY OF EPDM RUBBER GRANULES 1-3MM RED 168,000.00 2009 JORDAN
SHIV NARESH SPORTS ROHTAK INDIA RUNNING TRACK 1,788,750.00 2009 INDIA
ZAID AL HUSSEIN AL SOFOUH NEIGHBORHOOD PARK JOGGING TRACK 238,210.00 2009 DUBAI
DUBAI MUNICIPALITY PJ4103 ATHLETIC TRACK AT AL WASL CLUB 2,038,920.00 2009 DUBAI
KAAS GROUP LLC FOR TRADING & CONTRACTING SUPPLY OF CONICA PRODUCTS 247,196.00 2009 SAUDI ARABIA
KAAS GROUP LLC FOR TRADING & CONTRACTING SUPPLY OF CONIPUR MATERIALS 169,478.00 2009 SAUDI ARABIA
GULF FENCING & SPECIALIST SURFACING EST. WLL SUPPLY AND INSTALLATION OF RUBBER FLOORING FOR A JOGGING TRACK
332,572.00 2009 BAHRAIN
INTERNAL JOB FOR EQUINE SUPPLY OF SBR GRANULES & CONIPUR 322 201,806.00 2009 DUBAI
RTA JOGGING TRACK FOR SHEIK HAMDAN BIN MOHAMMAD’S FARM AT NAD AL SHEBA
370,000.00 2009 DUBAI
HIRCON INTERNATIONAL / DUBAI CIVIL ENGINEERING 23 MARINA PLOT A-23D DUBAI MARINA RUBBER FLOORING 139,320.00 2009 DUBAI
DUBAI AVIATION CLUB RESURFACING OF 1-7 COURTS 151,095.00 2009 DUBAI
125
KAAS SUPPLY OF CONIPUR MATERIALS 103,775.00 2010 SAUDI ARABIA
ALDAR MIMAR FOR ENGINEERING & CONSTRUCTION INDOOR FLOORING FOR ADEN / SEANOUN SPORTS HALLS 592,800.00 2010 YEMEN
ABU DHABI CENTER FOR HOUSING & SERVICES FACILITIES / AL QANTARAGENERAL CONTRACTING CO.
AL JAWAHRI SCHOOL AT AL MIRFA – ARTIFICIAL GRASS FIELD
AND RUBBER FLOORING1,085,740.00 2010 ABU DHABI
PORT SAEED CONTRACTING / DUBAI MUNICIPALITY JOGGING TRACK FOR ZABEEL PARK 234,000.00 2010 DUBAI
KAAS GROUP SUPPLY OF CONIPUR MATERIALS 109,498.00 2010 SAUDI ARABIA
MR. SEED AL TAYER / DUBAI DAWN DISTINGUISHED CONSTRUCTION
PRIVATE VILLA FOR MR. SAEED AL TAYER AT AND AL SHEBA 111,000.00 2010 DUBAI
DUBAI MUNICIPALITY / CITISCAPE PJ9183 REDEVELOPMENT OF COMMUNITY FACILITY AT
MUHAISNAH174,000.00 2010 DUBAI
DUBAI MUNICIPALITY / ZAID AL HUSSAIN PJ1227 LADIES CLUB AT ZABEEL 240,240.00 2010 DUBAI
DUBAI MUNICIPALITY / ZAID AL HUSSAIN PJ1227 LADIES CLUB AT ZABEEL (CONIPUR 2S MODIFIED) 240,240.00 2010 DUBAI
KHANSAHEB INVESTMENT LLC RUBBER FLOORING FOR KHANSAHEB INVESTMENT AT AL MIZHAR VILLA (CONIPUR 1S MODIFIED)
107,000.00 2010 DUBAI
RELIANCE SPORTS SUPPLY OF CONIPUR MATERIALS 147,723.00 2010 DUBAI
LE MERIDIEN HOTEL LE MERIDIEN HOTEL (CONIPUR EPDM 10MM) 26,900.00 2010 DUBAI
JEBEL ALI GOLF RESORT AND SPA JEBEL ALI SHOOTING CLUB CENTRE FOR EXCELLENCE / TIGER TURF ER65ES FOR FOOTBALL FIELD
1,190,160.00+ 45,000.00
2010 DUBAI
DUBAI MUNICIPALITY / PORT SAEED TRANSPORT AND BUILDING CONTRACTING
PJ2104 / 2 ANNUAL CONTRACT FOR LEVELLING & ASSOCIATEDWORKS OF PROJECTS AT WARQA DUBAI
1,493,250.00 2010 DUBAI
126
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
DUBAI MUNICIPALITY / CRACKNELL LANDSCAPE / GREENLAND COMPANY LLC
PJ 1160 / 8 PALACE FOR H.H. THE CHAIRMAN OF DUBAI MUNICIPALITY / MODIFIED CONIPUR 2S
289,000.00 2010 DUBAI
KAAS SUPPLY OF CONIPUR PRODUCTS 105,093.00 2010 DUBAI
DUBAI AVIATION CLUB REFURBISHMENT OF EXISTING TENNIS COURTS 169,260.00 2010 DUBAI
KAAS SUPPLY OF CONIPUR PRODUCTS 169,761.00 2010 DUBAI
127
MEP
Design and execution of:
Electro-mechanical services
Electrical services
Mechanical services
Plumbing services
Specialized in:
Customized Water features
Themed Fountains
MEP
128
CLIENT NAME PROJECT TITLE SCOPE CARRIED OUT VALUE (AED) YEAR AREA
Al Futtaim Carillion Marina Hotel Construction of Water Features at Marina Hotel, Yas Island, Abu Dhabi
14,111,750.00 2009 UAE
Al Tayer Stocks LLC Marina Hotel M&E Works for Water Features at Marina Hotel, Yas Island, Abu Dhabi
6,448,960.00 2009 UAE
Engineer's Office Club Complex Supply & installation of landscape External Lighting for Club Complex at Nad Al Sheba, Dubai (Project No. P102
0800)
1,771,741.15 2009 UAE
Hilton Abu Dhabi Abu Dhabi M&E works repair / replacement of equipment in plant
room no. 2 in Abu Dhabi
1,100,786.00 2010 UAE
Al Nuaimi Group Armed Forces MEP Works for swimming pool for U.A.E Armed Forces at Ras Al Khaimah
1,955,447.00 2010 UAE
Ali Moosa & Sons Contracting
Ajman Palace Water Feature 1&3 for Outdoor Service Yard on private Place in Ajman for H.H Shk. Ammar Bin Humaid
1,500,000.00 2010 UAE
Six Construct Co.
Ltd.
Presidential Terminal MEP works for 2 nos. of Water Feature at Presidential
Flight - State Guest Reception Terminal - Abu Dhabi
2,601,850.00 2010 UAE
Master Electrical & Mechanical Works
LLC
Zirku Island MEP works for the Refurbishment of 2 Nos. Swimming Pools for Zadco in Zirku Island, Abu Dhabi
1,950,000.00 2010 UAE
Six Construct Co.Ltd.
Cleveland Clinic Construction of Water Feature at Cleveland Clinic 27,200,000.00 2011 UAE
Yousef General
Contracting Est.
Manama Camp MEP works for Swimming Pool at Al Manama Camp 1,000,000.00 2011 UAE
Samsung Engineering Co. Ltd
Ruwais Refinery Installation of Intergrated water system for Temporary camp area in Ruwais refinery expansion project, Abu
Dhabi, UAE
19,000,000.00 2011 UAE
Emirates Link Maltauro LLC
Brighton College MEP Works for Swimming Pool & Kids Pool for Brighton College on Plot No. 102-106, Sector E-48, Abu Dhabi
1,200,000.00 2011 UAE
WAVES TRADING AND CONTRACTING W.L.L.
A SELECTION OF MEP UNIT PROJECTS
129
•
SIZE IS NO RESTRICTION
WATERTEC
Wet Infrastructure:
We design and supply the following products and systems.
• Drainage Networks and Pumping Stations
• Water Networks and Pumping Station
• District Cooling Piping Works, ETS and DCP
• Vacuum Sewerage System
• Sewage Treatment Plant
• Industrial Effluent Treatment Plant
• Air Odour Control System
• Operation and Maintenance Contract
SCOPE OF SERVICES
Engineering
Procurement
Operation
Maintenance
Pumping Stations (Sewage /
Irrigation Water / Storm Water
and its Rising Mains)
Sewage Treatment Plants
Industrial Effluent Treatment
Plants
Vacuum Sewerage and its Mains
Air Odor Control Systems
Seawater Intake and Outfall
District Cooling System
130
SEWAGE TREATMENT PLANT:
CLIENTS DESCRIPTION VALUE YEAR AREA
BARWA AL BARAHA 12000m3/DAY SEWAGE TREATMENT PLANT - TRUCK PARKING AND FACILITIES – PHASE-1 OF AL BARAHA
PROJECT
QR 55,000,000 2009 DOHA
BARWA DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 2 NOS. 1500m3/DAY SBR TYPE
STP AT SOUTH OF DOHA AND WEST SAILIYA – DOHA QATAR
QR 31,000,000 2007 DOHA
DUTCO SEWAGE TREATMENT PLANT & PUMPING STATION -
1,400m3/DAY AT JEBEL ALI LABOU CAMP
AED 6,500,000 2006 DUBAI
KHANSAHEB CIVIL ENGINEERING STP EXTENSION FOR JEBEL ALI LABOUR CAMP AED 4,500,000 2006 DUBAI
KHANSAHEB CIVIL ENGG UPGRADING OF CAMP’S SEWAGE TREATMENT
PLANT
AED 1,300,000 2006 DUBAI
KHAN SAHEB ENGINEERING S.T.P 2500 m3 / DAY WITH PUMPING STATION AT JABEL ALI
AED 2,500,000 2004 JEBEL ALI
UAE MINISTRY OF HEALTH 2000m³/DAY STP AED 6,240,000 2003 FUJAIRAH
AQUATOR MBR 1000m³/DAY STP AED 8,000,000 2003 DUBAI
WAVES TRADING AND CONTRACTING W.L.L.
A SELECTION OF WATERTEC UNIT PROJECTS
131
PUMPING STATIONS (SEWAGE / IRRIGATION):
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
ASHGHAL – PWA DESIGN & CONSTRUCTION OF AL – BARAHA STW
TANKERS RECEPTION AND TSE INJECTION FACILITY
QR. 11,868,990 2010 DOHA
MEYDAN PROPOSED DEVELOPMENT & CONSTRUCTION OF THE NAD AL SHEBA RACECOURSE ON PARCEL ID 600-6888 – CIVIL / MEP AND PIPELINE WORKS FOR
SEWERAGE PUMPING STATION – PE 38,000
AED. 21,318,170 2009 DUBAI
ALDAR LAING O’ROURKE AL RAHA BEACH DEVELOPMENT PROJECT –INFRASTRUCTURE AT ABU DHABI – CONSTRUCTION OF UNDERGROUND IRRIGATION RESERVOIR (IPS1) & 3-NOS. OF SEWAGE PUMPING STATIONS (PSA1, PSB1
&PSB2)
AED. 64,186,841 2008 ABU DHABI
EMAAR PROPERTIES MOHAMMED BIN RASHID HOUSING PROGRAMME –OUD AL MUTEENA CONSRUCTION OF 940 RESIDENTIAL VILLAS AND ASSOCIATED
INFRASTRUCTURE WORKS CONTRACT NUMBER 2303 – S.SI. NO. IW021 CONSTRUCTION OF BOOSTER
PUMP STATIONS AT OUD AL MUTEENA & AL WARQA’A FOR IRRIGATION MAINLINE
AED 1,821,815 2008 DUBAI
CAPITAL INVESTMENT IRRIGATION PUMPING STATION AT KAZLAN ISLAND AED 12,000,000 2006 ABU DHABI
PUBLIC WORKS DEPT. PUMPING STATION AT LULU ISLAND AED 22,000,000 2005 ABU DHABI
132
SHAMS - ABU DHABI SEWAGE LINE WITH LIFTING STATION AT AL REEF
ISLAND
AED 15,000,000 2005 ABU DHABI
RASHID HOSPITAL IRRIGATION NETWORKS & PUMPING STATION AED 6,500,000 2004 DUBAI
PIPELINES:
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
MEYDAN BUSINESS PARK BLOCK P, N STORMWATER
DRAINAGE WORKS
AED. 1,150,000 2011 DUBAI
MEYDAN SEWERAGE AND PIPE JACKING WORKS FOR THE PROPOSED DEVELOPMENT AND CONSTRUCTION OF
MEYDAN BUSINESS PARK ON PARCEL ID 618-9338, NAD AL SHEBA, DUBAI, UNITED ARAB EMIRATES
(CONTRACT NO. M-031-INF-SDN-C-000)
AED 5,849,233 2010 DUBAI
MEYDAN SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF FIRE FIGHTING PIPE WITH
APPROVED HDPE PIPE INCLUDING ALL EXCAVATION WORKS, PIPE LAYING, TESTING, BACKFILLING AND ALL NECESSARY ACCESSORIES (CONTRACT NO. M-
10-INF-FFN-C-01)
AED. 12,562,200 2009 DUBAI
MEYDAN PROPOSED DEVELOPMENT & CONSTRUCTION OF MEYDAN CITY ON PARCEL ID 611-122, BUKADRA,
DUBAI – UAE
AED. 1,800,000 2009 DUBAI
133
DISTRICT COOLING:
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
TABREED – NATIONAL CENTRAL COOLING
CO.
TABREED DISTRICT COOLING SCHEME AD01, INTERNATIONAL PETROLEUM AND INVESTMENT CO.
PIPING AND ETS WORKS
AED. 3,900,000 2010 ABU DHABI
TABREED – NATIONAL CENTRAL COOLING
CO
TABREED DISTRICT COOLING SCHEME AD04, GHQ-B2B ETS ROOM PHASE – 2 INTERNAL PIPING & HEAT
EXCHANGERS WORKS
AED. 764,150 2010 ABU DHABI
TABREED – NATIONAL CENTRAL COOLING
CO
TABREED DISTRICT COOLING SCHEME AD04, J.W. MARRIOTT ETS WORK AND CONNECTION TO
TABREED CHW NETWORK
AED. 1,410,000 2010 ABU DHABI
WASTEWATER TREATMENT PLANT:
CLIENT / CONTRACTOR DESCRIPTION VALUE YEAR AREA
UNIBETON READY MIX LLC 2 NOS. 100m3/DAY WASTE WATER TREATMENT PLANT AT TALL TOWER DUBAI
AED 360,000 2008 DUBAI
AL FALAH READY MIX CO. SUPPLY & INSTALLATION OF CHROMIUM REDUCTION & pH CONTROL PLANT – 2 NOS.
50m3/DAY AND 1 NO. 100m3/DAY
AED 353,000 2007 DUBAI
ARABIAN MIX CO. 22,000 IMP. GALLONS PER DAY CHROMIUM REDUCTION AND pH CONTROL – 3 NOS. BATCHING
PLANT AT AL QUOZ
AED 390,000 2007 DUBAI
RAK CERAMINCS WATER WASTE TREATMENT PLANT AT RAS AL
KHAIMAH
AED. 4,000,000 2006 RAS AL
KHAIMAH
134
C
CERTIFICATE
C
For verification and updated information concerning the present certificate visit to www.lmscert.com
This Certificate is the property of LMS Certification Limited and shall be returned immediately when demanded.
LMS/IAS/F109Q/17/REV02
LMS Certification Limited35 Park Hill, Huddersfield, HD2 1QG, West Yorkshire, United Kingdom.Phone : +44 2089355094VisitE-mail
:-:-www.lmscert.com
MSCB132
This is to Certify that the
Quality Management System
of
WAVES TRADING & CONTRACTING W.L.L.
has been independently assessed and is compliant
with the requirements of
ISO 9001:2015
This Certificate is applicable to the following product or service ranges:
Certificate No.: QA86570A
CIVIL, FINISHING, MEP, AND MAINTENANCE WORKS OF SWIMMING POOL & WATER FEATURE.
SOFT LANDSCAPING WORKS SUCH AS: EXCAVATION, DISPOSAL, BACKFILLING OF SWEET SOIL,
PLANTING OF PLANTS, IRRIGATION WORK FOR SOFT SCAPE SUCH AS PIPING WORK,
IRRIGATION TANK AND PUMP AND IRRIGATION ACCESSORIES. HARD LANDSCAPING
WORKS SUCH AS CONCRETE, GRANITE AND MARBLE PAVING, KERBSTONE, TILE WORKS,
STAMP CONCRETE, STREET FURNITURE. SUPPLY AND INSTALLATION OF SPORTS FLOORING,
SPORTS EQUIPMENT, ARTIFICIAL GRASS, NATURAL GRASS AND BEAUTIFICATION OF
GRASS, SAUNA, SPA AND STEAM ROOM, SAND SURFACE FOR EQUINE
AND RUBBER FLOORING FOR EQUINE.
P.O. BOX: 82431 DOHA, QATAR
Date of initial registration
Date of this Certificate 24September 2019
This Certificate is property of LMS Certifications and remains valid
subject to satisfactory surveillance audits.
Director
24 September 2019
Recertification Due / Certificate expiry 23 September 2022
Surveillance audit on or before 23 September 2020
139
This is to Certify that the
Quality Management System
of
WAVES TRADING & CONTRACTING W.L.L.
has been independently assessed and is compliant
with the requirements of
ISO 14001:2015
This Certificate is applicable to the following product or service ranges:
Certificate No.: QA86578B
CIVIL, FINISHING, MEP, AND MAINTENANCE WORKS OF SWIMMING POOL & WATER FEATURE.
SOFT LANDSCAPING WORKS SUCH AS: EXCAVATION, DISPOSAL, BACKFILLING OF SWEET SOIL,
PLANTING OF PLANTS, IRRIGATION WORK FOR SOFT SCAPE SUCH AS PIPING WORK, IRRIGATION
TANK AND PUMP AND IRRIGATION ACCESSORIES. HARD LANDSCAPING WORKS SUCH
AS CONCRETE, GRANITE AND MARBLE PAVING, KERBSTONE, TILE WORKS, STAMP CONCRETE,
STREET FURNITURE. SUPPLY AND INSTALLATION OF SPORTS FLOORING, SPORTS EQUIPMENT,
ARTIFICIAL GRASS, NATURAL GRASS AND BEAUTIFICATION OF GRASS, SAUNA, SPA AND
STEAM ROOM, SAND SURFACE FOR EQUINE AND RUBBER FLOORING FOR EQUINE.
P.O. BOX: 82431 DOHA, QATAR
Date of initial registration
Date of this Certificate 25 September 2019
This Certificate is property of LMS Certifications and remains valid
subject to satisfactory surveillance audits.
Director
25 September 2019
Recertification Due / Certificate expiry 24 September 2022
Surveillance audit on or before 24 September 2020
140
This is to Certify that the
Occupational Health & Safety Management System
of
WAVES TRADING & CONTRACTING W.L.L.
has been independently assessed and is compliant
with the requirements of
ISO 45001:2018
This Certificate is applicable to the following product or service ranges:
Certificate No.: QA86578C-1
CIVIL, FINISHING, MEP, AND MAINTENANCE WORKS OF SWIMMING POOL & WATER FEATURE.
SOFT LANDSCAPING WORKS SUCH AS: EXCAVATION, DISPOSAL, BACKFILLING OF SWEET SOIL,
PLANTING OF PLANTS, IRRIGATION WORK FOR SOFT SCAPE SUCH AS PIPING WORK, IRRIGATION
TANK AND PUMP AND IRRIGATION ACCESSORIES. HARD LANDSCAPING WORKS SUCH
AS CONCRETE, GRANITE AND MARBLE PAVING, KERBSTONE, TILE WORKS, STAMP CONCRETE,
STREET FURNITURE. SUPPLY AND INSTALLATION OF SPORTS FLOORING, SPORTS EQUIPMENT,
ARTIFICIAL GRASS, NATURAL GRASS AND BEAUTIFICATION OF GRASS, SAUNA, SPA AND
STEAM ROOM, SAND SURFACE FOR EQUINE AND RUBBER FLOORING FOR EQUINE.
P.O. BOX: 82431 DOHA, QATAR
Date of initial registration
Date of this Certificate 25 September 2019
This Certificate is property of LMS Certifications and remains valid
subject to satisfactory surveillance audits.
Director
25 September 2019
Recertification Due / Certificate expiry 24 September 2022
Surveillance audit on or before 24 September 2020
141
Date: 14th JUNE 2020 REF: REPRESENTATION / AUTHORIZATION FOR INSTALLATION TO WHOM IT MAY CONCERN: This is to confirm and certify that “Waves Trading & Contracting W.L.L.”, is our appointed distributor/representative and has been certified to promote, sell , install and perform contract duties for all the Prestige / PSS sports products /systems - manufactured & supplied by Prestige for Qatar for the Squash Court
Project. Prestige Sports Systems are approved / certified by FIBA (International Basketball Federation) and the WSF (World Squash Federation). The systems are also tested under the strictest and highest international guidelines under DIN 18032:2 “Otto-Graf Institute, Germany”, EN-14904 (European Norms), ASTM (American Society for Testing Methods) and JIS (Japan Industrial Standards) ensuring the performance, durability and safety of our sports systems. Prestige remains a good standing member as well of various flooring organizations in the United States (Maple/Beech/Birch and Oak) flooring associations such as MFMA (Maple Flooring Manufacturer’s Association), NWFA (National Wood Flooring association) and many other organizations.
Prestige Enterprise International, a Cincinnati, Ohio, USA based company, with exports to over 55 countries worldwide is fully
committed in assisting and supporting “Waves Trading & Contracting
W.L.L” by supplying certified, high performance, durable, safe and professional sports systems.
Prestige Enterprise International fully supports and services “Waves
Trading & Contracting W.L.L” to ensure a successful supply for the
Squash Court Project. Please do not hesitate to contact us for any further technical or other information. Sincerely,
M. Gabbour
CEO
11343 Grooms Road Cincinnati, OHIO 45242, USA Tel: 513-469-6044 Fax: 513-469-6444 E-mail: [email protected] Web Page: www.prestigefloor.com
144
REMP TECHNO SRL. 11, via dell’Industria 48013 Brisighella (RA) Tel. +39 0546 81721 Fax +39 0546 85571 E-mail [email protected] www.remprubber.com
Brisighella – April 3rd , 2019
CERTIFICATE We REMP TECHNO SRL, as manufacturer of rubber floor coverings,
declare
that the company Waves Trading and Contracting is an authorized dealer of Remp products and Remp
authorizes Waves Trading and Contracting to distribute and install Remp products in the Qatari market
only.
We remain at your disposal for any further information.
In faith Mauro Malavolti Managing Director
145
San Fior, 24th December 2013
Subj.: Authorization letter
The Italian manufacturer of sports equipments named Sport System S.a.s. based in Via del
Lavoro, 2 – 31020 San Fior (TV) – Italy
declares
that company “Belhasa Projects Qatar LLC” based in Doha, Qatar is an official dealer of
company Sport System S.a.s. based in San Fior, Italy with right to promote and distribute
Sport System’s sports equipment within the territory of Qatar.
SPORT SYSTEM S.A.S.
To whom it may concern
147
I 1!011~1
..___:::__,J~lg~J~ TAKING-OVER CERTIFICATE Supreme Committee for Delivery & Legacy OPP-Supply & Installation Gym Equipment
Project Name: Old Doha Port Project - Supply and Installation of ISSUED DATE: 06 August 2020
Gym Equipment
CONTRACT NO: TD0-20-CP-0088 / P060008224 To: Mr. Bilal Al Abdallah
EMPLOYER: SUPREME COMMITTEE FOR DELIVERY AND LEGACY
ADDRESS: Level 37, Al Bidda Tower, Al Corniche Street West Bay, PO Box 62022 Doha, State of Qatar
CONTRACTOR: WAVES TRADING & CONTRACTING W.L.L. ADDRESS: PO. Box 82431,
Doha, Qatar
TAKING OVER OF THE WORKS We refer to Agreement/Purchase Order No. : TD0-20-CP-0088 I P060008224 dated 12 January 2020 entered into between us, the Supreme Committee for Delivery & Legacy (SC), and you, WAVES TRADING & CONTRACTING W.L.L. Unless otherwise stated in this certificate, any defined terms contained herein shall have the meanings set out in the Purchase Order.
Pursuant to Clause 16 [SC's Taking Over] of the Purchase Order, we hereby notify you that the Works were completed in accordance with the Contract on 81h April 2020.
This Taking-Over Certificate is without prejudice to SC's rights and remedies with respect to any matters whatsoever or however arising from or in connection with the Contractor's performance of the Purchase Order (whether arising before or after the date of this Taking-Over Certificate) and shall not relieve the Contractor of any on-going obligations under the Purchase Order or at Law.
Name: Name: Mohammed $.Rashid
/JJ,Jfi+--11~tt.fi'~::==::----- I Designation: Chief Resident
Date:
Signed by Engineer:
Name: Mohammed Al Mulla
Designation: Project Director, Technical Delivery Office
Date:
Signature
Engineer
Date: ,, 08/ i,o1..0
Signed on behalf of SC:
Name: Hila! Al Kuwari
Designation: Chairman, Technical Delivery Office
Date:
Signature
Signature
07-08-2020
#For
10/08/2020
159
ASPIRE ZONE FOUNDATION
A S f- I R E
CERTIFICATE OF PRACTICAL COMPLETION
CONTRACT PARTICULARS:
Contract No : SP/C/1629/18
SLIPPY, DELIVERY, INSTALLATION AND MAINTENANCE OF CHILDREN PLAYContract Name: AREA EQUIPMENT AND EXERCISE AREA GYM EQUIPMENT FOR AL BAYT
STADIUM AT AL KHOR (SP/C/1629/18)
Contractor:
Contract Amount:
Final Account Statement
Separable Portion Details:
Contract Completion Date :
Extended Completion Date
Date of Hand Over:
Penalty Applied:
WAVES TRADING & CONTRACTING WLL
QAR2,513,453.85
QAR2,433,714.27
None
31- Aug -18
26- Apr -19
26- Apr -19
N/A
In accordance with Clause 48 of the Contract the Engineer is of the opinion that the above -named Contractor hassubstantially completed the above Works and the relevant parts having passed the required tests, it is certified that
a) The Works are deemed to be substantially complete as at the extended Completion Date stated above (26/4/19).
b) The Contractor shall be responsible for the watching and care of whole of the Works until completion
of the 'Period of Maintenance' as stated in the Contract.
c) The 'Period of Maintenance' shall commence on 26 April 2019 and end on 30 May 2020 ( 400 Days).
d) The Contractor shall Maintain the Works and attend to all Patent and Latent Defects in accordance with
Maintenance requirements stated and up to the end of the'Period of Maintenance'.
e) The above Date will be subject to adjustment if further Defects are revealed during the 'Period of Maintenance',
which are required to be rectified.
f) This Certificate is issued in accordance with Clause 48 of the General Conditions of Contract.
Date......Hilal Jeham AI- Kuwari
Aspire Zone Foundation - President
Date AA. %zl ... 1aNAbdulaziz AI- Mahmoud
I
r
Date
Dr. sser Hamad Al Hajeri
Deputy President for Sports Projects - AZF Project Director - AZF
Distribution :
Original : Contractor - Waves Trading & Contracting W.L.L.Copies: Ayman, Attia, Suyash, KEO
165
From: Jens Schuster <[email protected]>Sent: Sunday, February 3, 2019 9:14 AMTo: bilalsamiCc: Nadeem Khan; [email protected]: RE: waves recommendation letter
Dear Bilal, I would like to express my sincere gratitude and congratulate your Team for a job well done, the project was completed in the specified timeframe and with a high level of quality. We appreciate the professionalism demonstrated and we are looking forward to work with your Company again in the near future. Thank you & Best Regards
JENS SCHUSTER Corporate Director - Maintenance KATARA HOSPITALITY Marina District, Lusail City | P.O.Box 2977, Doha, Qatar D: +974 4423 7717 | T: +974 4423 7777 | M: +974 3060 7013 | F: +974 4442 8619 [email protected] | www.katarahospitality.com
This transmission is confidential and intended solely for the person or organization to whom it is addressed. It may contain privileged and confidential information. If you are not the intended recipient, you should not copy, distribute or take any action based on it. If you have received this transmission by error, please notify the sender at the e-mail address above.
175
AI Jaber Trading & Contracting CO. W.L.L.
Contracting Division
·r·r·:.u:i..,L4I..,oJI ,?"i \) J-:'~I4S~
~~JL..>lI,........
Capital QR,. : 85,000,000
J.T.C. P.O. Box: 1120 DOHA-QATAR
~~JI.:) Ao p •• p •• JU1U"'i)
.~.~.~
'\'(' : ,":-,.~
~ - ~-,.JJI
Tel. : 44323737/44434493 Main Office
E-mail: [email protected]
~..;-II...,..:;s:.tl tttrtf,\T" ::r.,.rv,.v :~
CERTIFICATE OF COMPLETION (Whole)
[email protected]: ';J~,!I ....I;:!~1
Subcontract Title : Supply, Delivery, Installation and Maintenance of Indoor/Outdoor Surfaces and Equipment
Project : Construction of Three (3) New Schools Package 6, Stage 9,
Contract No. : C2014/144
Subcontractor : M/s Belhasa Projects Qatar LLC
IDa" .f Como'·Ii., : 24th July 2016
In accordance with Clause 48 of the General Conditions of Main Contract, we certify that the Whole of the Works for the above-mentioned contract has been substantially completed and taken over by the user / the Employer.
Issuance of this certificate does not relieve the Subcontractor for any remedial works and warranty claims that may arise related to the above Subcontract.
Signed for and on behalf of, AL JABER TRADING & CONTRACTING CO., W.L.L.
MOHAMED AL HAMA YDA Acting General Manager
AL JABER TRADING & CONTRACTING CO P.O. BOX: 1120. DOHA. QATAR
IlfO : ... ..»1.;;:;..')'\<-;...>- ' 00': c>..>~ J;,....- + w,fin n 'A: voSL; - +~ vtt t \"l \"v \" v/+~ v! . 'A 'A':.j.,;;J:i
Tel.:+974 44098181 1 +97444323737 Fax: +974 44323168 - C.R. No.: 9554 -IMPORT LICENCE No.: L1245
.IJ,t.- HI , 'I v: ALJABER
188
1
From: Cherylliz Anne Lago <[email protected]>Sent: Tuesday, February 4, 2020 10:03 AMTo: RashidCc: Marvin TejadaSubject: PREQUALIFICATION CONFIRMATION: WAVES TRADING AND CONTRACTING for
Sports Surfaces, Swimming Pool, Sauna & Steam, Artificial Grass, Landscaping, Kids Play & Fitness Equipment and Sports Equipment
Dear Mr. Rashid, This is to inform you that your prequalification has been APPROVED as per the evaluation conducted by the review committee. This notification serves as your confirmation. The approval is intended only for the following brands and products/materials of WAVES TRADING AND CONTRACTING:
1. Swimming Pool 2. Water Features 3. POLYTAN – Sports Surfaces 4. INTEGRAL ENTEGRA Y T LIMITED / INTEGRAL GRASS – Artificial Grass 5. PARK GAMES – Kids’ play and Fitness Equipment 6. AFN SPORTS – Sports Equipment 7. Landscaping
Please be informed that AEB will not issue any certificate or letter to validate that you are in AEB’s Master Database or in particular project’s Vendor Listing. Thank you. Warm regards, Cherylliz Lago, uap, Int’l Assoc. AIA Architect – Specifications Writer D: +974 4406 8872 I T: +974 4406 8888 I F: +974 4447 7868 I M: +974 3303 7132 Bldg.100, Ibn Seena Street 950, Al Muntazah, PO Box 1148, Doha, Qatar Doha I Muscat I Salalah I Manila
www.aeb-qatar.com
This transmission is confidential and intended solely for the person or organization to whom it is correctly addressed. If you are not the intended recipient of this email, you should not take any action in reliance on it. Further, this transmission may contain confidential design and other information owned by Arab Engineering Bureau. You should not copy, distribute, use offer for sale or hire such information or in any way infringe the design and intellectual property rights of Arab Engineering Bureau. Please consider the environment - do you really need to print this email?
230
To,
Subject: Employer Registration Acknowledgement Letter
Dear Sir/Madam,
Belhasa Projects Qatar LLCAirport Road 5102, Doha, QATAR
With reference to the application dated 26/11/2016 for the registration with Indian Mission to recruit and employ Indianworkers in QATAR, M/s Belhasa Projects Qatar LLC are hereby registered with Employer ID FE5339697 on 05/12/2016.
This registration is valid for 5 years.
Date: 05/12/2016
This is system generated Employer Registration Acknowledgement Letter by eMigrate System of Ministry of External AffairsOverseas Employment Division (MEA-OED), Government of India.For further details, you may call eMigrate Helpdesk at 91-11-2688-7772 on all working days from 9:00AM to 7:00PM or sendan e-mail to [email protected].
Employer Registration Acknowledgement Letter
FE5339697
325
PLEASE FEEL FREE CONTACTING US ANYTIMEWE ARE LOOKING FORWARD ASSISTING YOU IN YOUR PROJECT
Bilal Al Abdallah General Manager
Email: [email protected] Tel. No. +974 4441 6319
Fax No. +974 4441 6312
Mobile: +974 5563 1639
338