C - National Horticulture Board

39
"/ National Horticulture Board /' \(', Ministry of Agriculture & Farmers Welfare /' C,\ Government of India, \, ,. Plot No.85, Sector 18, Institutional Area, ~-...... - -_••-,!-~ Gurugram ~ 122 015 (Haryana) Ph. 0124-2342992, Fax: 2342991, 2341225 \ Website: www.nhb.gov.in NHB/CC/21 sl PPAC/2020-21/ (3~£ December 17, 2020 Office Meano•.anduan Subject: Proceedings of the 21 st aneeting of the Pre- Project Appraisal Coananittee to consider the proposals under various scheanes of the Board held on 09.12.2020 at NHB, HQ, Gurugraan (Haryana) - Regarding. This issues with the approval of Competent Authority dated 17.12.2020. ~l1\II1">" (O.K. Pal) Deputy Director I am directed to enclose herewith a copy of the Proceedings of the 21 st Meeting of the Pre-Project Appraisal Committee held on 09.12.2020 at NHB, Head Quarters, Gurugram (Haryana) during financial year 2020-21 under the Chairmanship of Dr. R. Bhati, Joint Director, NHB. Distribution: 1) All Area Officers /Joint Directors, NHB, Gurugram. 2) Accounts Officer, NHB, Gurugram. Copy for information to : 1) PS to MD, NHB, Gurugram

Transcript of C - National Horticulture Board

" / National Horticulture Board/' \(', Ministry of Agriculture & Farmers Welfare/' C,\ Government of India,

\, ,. Plot No.85, Sector 18, Institutional Area,~-...... - -_••-,!-~

Gurugram ~ 122 015 (Haryana)Ph. 0124-2342992, Fax: 2342991, 2341225

\

Website: www.nhb.gov.inNHB/CC/21sl PPAC/2020-21/ (3~£ December 17, 2020

Office Meano •.anduan

Subject: Proceedings of the 21st aneeting of the Pre- Project AppraisalCoananittee to consider the proposals under various scheanesof the Board held on 09.12.2020 at NHB, HQ, Gurugraan(Haryana) - Regarding.

This issues with the approval of Competent Authority dated 17.12.2020. ~l1\II1">"(O.K. Pal)

Deputy Director

I am directed to enclose herewith a copy of the Proceedings of the 21st Meeting of thePre-Project Appraisal Committee held on 09.12.2020 at NHB, Head Quarters, Gurugram(Haryana) during financial year 2020-21 under the Chairmanship of Dr. R. Bhati,Joint Director, NHB.

Distribution:

1) All Area Officers /Joint Directors, NHB, Gurugram.2) Accounts Officer, NHB, Gurugram.

Copy for information to :

1) PS to MD, NHB, Gurugram

National Horticulture BoardDepartment of Agriculture, Cooperation and Farmers' Welfare

Ministry of Agriculture and Farmers' Welfare

o t d 17 122020NHB G, urugram, aeSubject Minutes of the 21st Pre-Project Appraisal Committee (PPAC) meeting to

consider the proposals under various schemes of the Board during financialyear 2020-21.

Date & Time 09.12.2020 at 11.00 amVenue NHB, Gurugram

The Meeting was chaired by Dr. R. Bhati, Joint Director, NHB. The following members attended the meeting.

S. Composition Name of OfficerlRepresentative with Designation attended the meetingNo1. Sr. Most Joint Dr. R. Bhati, Joint Director, NHB.

Director, NHB-Chairman

2. Area Officers of 1. Shri Pushpendra Arya, Area Officer, South Zone, NHBNHB - Member 2. Shri Dhal Singh, Area Officer, West Zone, NHB.

3. Shri R.S.Meena, Area Officer, North Zone, NHB4. Shri Bani Singh, Area Officer, North-East Zone, NHB

IN ATTENDANCE

I. Sh. Umed Singh, Deputy Director, NHB2. Sh. U.S. Bhardwaj, Deputy Director, NHB3. Sh. D.K. Pal, Deputy Director, NHB4. Sh. Anil Kumar, Deputy Director, NHB5. Sh. P.K. Bera, Sr. Horticulture Officer, NHB6. Sh. Alok Kumar, Sr. Horticulture Officer, NHB7. Sh. Ashok Kumar, Sr. Horticulture Officer, NHB8. Sh. Ratan Lal Fulwariya, Sr. Horticulture Officer, NHB

Proceedings of the PPAC meeting held on 26.11.2020 were circulated on 17.12.2020. There being noobservation from any of the members, the Committee confirmed the minutes.

It was reiterated that IPA guideline must be followed meticulously and Examination of proposals must bedone with due diligence and concerned dealing officers will be accountable for any failure on their part as laiddown in Internal Note dated 14.03.2019 under instruction from MD.

IIPage

The summary of projects discussed in the meeting is as under:-

S.No. Particulars No. of proiects1 No. of cases considered 1302 Approved 563 Clarification sought (Deferred) 694 Rejected 025 Closed/Withdrawn 03

The case-wise decision oCthe PPAC is as under:-

Approved ProjectsPPAC discussed the following project proposals in the light of contents of agenda notes and schemeguidelines. PPAC noted that applicants have submitted all the documents as per the provisions under NHBScheme guidelines and found in order. PPAC recommended/approved these projects for issuance ofIPA forthe activity/area and conditions, if any, indicated against each project:-

Sr. Name of the project and Volume & Sr. Cropl Activity and Condition, if anyNo. project code No. of Agenda Area/Capacity

Notes1. Mr. Dattatray Shankar Bhor, West Zone Open field

Gat No - 1009, 1010 , 1102, (Sr. No 01) cultivation ofAt/Post- Chandori, Taluka - Grapes in 5.50 acre.Niphad, Dist- Nashik (MH)(27DMHD047497)

2. Mr. Subhash Mansaram Patil West Zone Cultivation ofJadhav, Gat no - 90/2/A, (Sr. No 03) Capsicum underAt/Post - Salwe, Taluka ~ Shade net house inShindkheda Dist - Dhule an area 4000 SqM(MH) (27DMHD047501)

3. Mrs. Gangaben Chandrakant West Zone Open fieldPatil, At-Gat no - 536, (Sr. No- 08) cultivation ofAt/Post - Ghodasgaon Taluka Mango In 31.55Muktainagar, Dist - Jalgaon acre.(MH) (27DMHD047498)

4. Mr. Shrikant Gururaj West Zone Cultivation ofNaganur, Survey/Gat No. (Sr. No. 09) Grapes in 08.0039911/B, Village - Mandrup, acres in open field.Taluka - South Solapur,District - Solapur (MH)(27BMHB048536)

5. Mr. Shubham Shivaji Patil, West Zone Cultivation ofSurvey/Gat No. 17111C, (Sr. No. 10) Grapes in 06.00Village - Telgaon, Post - acres in open field.Pathari, Taluka - NorthSolapur, District - Solapur(MH) (27BMHB048537)

". \r\./W.\~..

21Page , \1

6.

7.

8.

9.

10.

M/s Azalea Orchard Pvt. Ltd.,Plot No. 08, Village - Akurdi,MIDC, Talegaon FloriculturePark, Taluka - Mawal,District - Pune (MH)(27BMHB048538)

I

Mr. Dnyaneshwar PandurangShelke, Survey/Gat No.88/3/1, Village-Varale,Taluka - Mawal, District -Pune(MH) (27BMHB048534)

Mrs. Rani Sambhaji Bhosale,Survey/Gat No. 274/I/B/l/A,Village-Tulsbi, TalukaMadha, District - Solapur(MH) (27BMHB048531)

Mr. Vikramsingh Surendrasingh Rao, Survey/Gat No.73/4, Village - Karav, TalukaAmbarnath, District - Thane(MH) - (27BMHB048533)

Mr. Santosh Ram\lathDongare & Other 02,Survey/Gat No. 123/9, 123/10,123/11, 123/13, 123/14,123/15 & 123, Village -Nimaj, Taluka - Sangamner,District - Ahmednagar (MH) -(lPA-27BMHB048428)

West Zone(Sr. No. II)

West Zone(Sr. No. 13)

West Zone(Sr. No. 14)

(West Zone)Sr. No. 15

West Zone(Sr. No. 16)

Cultivation of Rosein 3,360 sq. mtr.under Poly House.

Cultivation of Rosein 8,000 sq. mtr.under Poly House.

Cultivation ofCapsicum in 8,000sq. mtr. under PolyHouse and 4,000 sq.mtr. under ShadeNet House.

Cultivation ofCapsicum in 4,000sq. mtr. under PolyHouse.

Cultivation ofGrapes III 06.00acres in open field.

Subject to entry ofregistered lease deed inrecord of right (ROR)before obtaining Grantof Clearance (GOC)from NHB. ThoseStates/Area whereregistered lease deedsare not entered in therecord of right (ROR),a certificate to thiseffect from theconcerned StateRevenue Authorityshall be submitted bythe applicant.

31Page

11.

12.

13.

14.

15.

Mr. Akshay Sureshbhai 8usa,Survey/Gat No. 40, Village -Madhapar, Taluka - Bhuj,District - Kutch (Gujarat)(24AGJOO10493)

Mr. Kerasiya RanchhodLakhman, Survey/Gat No.179, Village - Habay, TalukaBhuj, District - Kutch(Gujarat)-(24AGJ0010495)

Mr. Piyush Kantilal Sorathiya,Survey/Gat No. 584/Paiki 58,584/Paiki 23, Village -Chandrani, Taluka - Anjar,District - Kutch(Gujarat)(24AGJ0010480)

Mr. Krupalsinh ShaktisinhZala, Survey/Gat No. 42/Paiki01, Village - Jadura, Taluka -Bhuj, District-Kutch(Gujarat)-(24AGJOO 10498)

Mr. Nagjibhai ChanabhaiBoghara & Other 0 I ,Survey/Gat No. 74/Paiki 01,74/Paiki 02, 74/Paiki 03,75/Paiki 01 & 75, Village -Khambha Gir, Taluka -Visavadar, District -Junagadh(Gujarat)(24AGJ0010453)

West Zone(Sr. No. 19)

West Zone(Sr. No. 20)

West Zone(Sr. No. 21)

West Zone(Sr. No. 22)

West Zone(Sr. No. 23)

41Page

Cultivation ofCucumber in 8,000sq. mtr. underShade Net House.

Cultivation ofCucumber in 13,000sq. mtr. underShade Net House.

Cultivation of LimeIn 15.00 acres Inopen field.

Cultivation ofCucumber in 4,000sq. mtr. underShade Net House.

Cultivation ofMango In 18.00acres in open field.

Subject to entry ofregistered lease deed inrecord of right (ROR)before obtaining Grantof Clearance (GOC)from NHB. ThoseStates/Area whereregistered lease deedsare not entered in therecord of right (ROR),a certificate to thiseffect from theconcerned StateRevenue Authorityshall be submitted bythe applicant.

Subject to change ofconstitution fromIndividual to Group ofFarmers/Joint Farmers.

\1

16. Mr. Sameer Saite & Mr. East Zone Cultivation of After update the. Subham Saite, (Sr. No. 09) Banana in an area survey no. 180/2Survey no. 180/1, 1080/2, 10.00 acres in open instead of 1080/2.21/2 & 21/3 , Village- fieldJamawada, Block& Tahsil-Jagdalpur, Dist- Bastar (CG)(22ACGOOO1204)

17. Shri Bal Ram Mandavi & East Zone Cultivation of After update theothers, Survey no - 1/34/chh (Sr. No. 10) Banana in an area constitution individual& 1/32/tha, Village-Paisar, 8.00 acres in open to group of farmers.Tahsil- Pharasgaon, Distt- fieldKondagaon (CG)(22ACGOOO1206)

18 Shri Bajar Kashyap & Smt. East Zone Cultivation ofPakli, Survey no - 169/1 , (Sr. No. II) Banana in an area178/1, 222, 273/l, 373/1 & 6.25 acre in open427/1 , Village- Mohalai, field.Tahsil-Bakawand, Dist- Bastar(CG), (22ACGOOOI222)

19. Smt. Smriti, Survey no. 58/1, East Zone Cultivation of58/2, 58/3, 65/4, 65/5 & 65/6 , (Sr. No. 12) Banana in an areaVillage-Bachedi, Tahsil- S. 15.00 acre in openLohara, Dist- Kabirdham field.(CG), (22ACGOOOI227)

20. Shr; Somnath Sethiya s/o Shri East Zone Cultivation of RoseKurpati, Survey no. 392/4, (Sr. No. 13) in an area 4000Village- Markel, Tahsil- sqmt under polyJagdalpur, Dist -Bastar (CG) house.(22ACGOOO1230)

21. Shri Umesh Kumar & others East Zone Cultivation of After entry/update theSurvey no. 129/2, 163/9 (Sr. No. 14) Banana in an area Survey no m IPA(samil 164/10,167/9), 163/10 9.30 acre m open application as per(samil I) At- Village- field. request letter ofSinghanpuri ,RC-Raveli, ,

applicant.Tehsil -Kawardha, Distt.-Kabirdham (C.G.)(22ACGOOOI233)

22. Pravin Chandra Tiwari East Zone Cu Itivation of After update the nameSurvey no. Ill/I, village - (Sr. No. 15) Mushroom m 240 of Pravin ChandraKechandur, Dist - Durg (CG) MT Tiwari to Pravin(22ACGOOO1234) Chandra Tiwari,

Proprietor - ModernAgro

23. M/s Behera Builders East Zone Cultivation ofKhata no.l 52/l 39, Plot (Sr. No. 18) Capsicum in an areanO.I962, Mouza: Jharbeda, Ps: 8000 sqmt underBanai, Tehsil: Gurundia, Dis!: poly house.Sundargarh (Odisha) ,(21AOR0002981)

.. ~\1\\)-\51Page

J 24. Subudhi Mahakuda s/o East Zooe Cultivation ofRaghunatha Mahankuda (Sr. No. 19) Capsicum in an areaSurvey no. 510/478, Village- 12000 sqmt underR. Udayagiri, Tal- R. shade net house.Udayagiri, Dist- Gajapati(Odish~ I, (21 AOROO02983)

25. Dargeeling Garden Private East Zone Cultivation of IPA will be issuedLimited, Khatian No - 96, LR (ST.No. 20) Orchid 10 an area subject to RoR entryPlot 1406, 1407, 2, 3 LR 7500 sqmt under in lease deed beforeKhatian 205, 459, Jamidar poly house. issuance of Grant ofPara Gadra, Jalpaiguri (WestBengal) (l9A WBOO04900) Clearance (GoC)

26. MT. Ram Gopal Dhakad S/o East Zone Cultivation ofNarayan Lal Dhakad, Survey (Sr. No. 21) Cucumber in 8000no. 462/399/l /A & sqmt under Shade462/399/2/B, Village - Net houseJamusar Kalan, Tehsil -Berasia, Distt.- Bhopal (MP)(23AMPOO07088)

27. Mrs. Rashmi Mangal W/o East Zone Cultivation ofSonu Mangal, Survey no. (ST.No. 22) Cucumber in 8000392/l & 392/2, Village - sqmt under shadeJamusar Kalan, Tehsil - net houseBerasia, Distt.- Bhopal (MP)C23AMPOO07089)

28. Mr. Kamlakar Shekatkar, East Zone Cultivation of RoseSurvey no. 79/10, Village - (Sr. No. 28) in 4000 sqmt underSagoni Block Teak, Taluka - poly houseTendukheda,Dist.- Narsingpur(MP)(23AMPOO07073)

29. Mrs. A. L. Jayakumari, South Zone Cultivation of"APEKSHA", Survey (ST.No. 01) Capsicum underno.8/",Village Haralekatte, Poly house in 10000Bellavi Hobli, Taluk & sqm.District Tumkuru - 572107(Karnataka),(29AKA0026921 )

30. Sh. Bheemaraya S/O South Zone Cultivation ofPandappa Biradar, Survey No. (Sr. No. 02) Capsicum underl43/l , Village Lachyana, Poly house in 4000Taluka Indi, Dist. Bijapura- sqm.586128, (Karnataka),(29AKA0026944)

31. Sh. Somanath S/o Iranna South Zone Cultivation ofHanchinal, Survey No. 35/5, (Sr. No. 04) Grape in 8.00 acresVillage Hanchinal, TalukaSindagi, Dist. BijapurIKarnataka) 129AKA0026947)

32. Sh. Dareppa R Kumbar, South Zone Cultivation ofSurvey No. 653/3, Village (ST.No. 05) Capsicum underBalaganur, Taluka Sindagi, Shade net house inDist-Bijapur (Karnataka), 6000 sqm. ,(29AKA0026948)

61Page ,\'.t~\~'\ \1 \

j 33. Sh. Shivappa Tippanna Bandi, South Zone Cu Itivation ofSurvey No. 1911, Village (Sr. No. 06) Capsicum underKokatanur, Taluka Sindagi, Shade net house inDis!. Bijapur (Karnataka), 8000 sqm.(29AKA0026952)

34. Sm!. Sharadamma, Survey South Zone Cultivation ofNo. 83/2, Village Kotti, (Sr. No. 07) Coconut In 11.50Hulikunte Hobli, Yanjalagere acresPost, Taluk Sira, DistrictTumkuru- (Karnataka),(29AKA0026953) .

35. Sh. G.S. Jayaprakash, Survey South Zone Cultivation ofNo. 49/1, Village: (Sr. No. 08) Capsicum underMalonagathihalli, Hobli: Poly house in 4000Kasaba, Taluk: Nelamangala, sqm.Bangalore Rural (Karnataka),(29AKA0026954)

36. Sm!. B.S. Geetha, Survey No. South Zone Cultivation of38, Village Handikunte, Hobli (Sr. No. 09) Coconut In 07.50Hulikunte, Taluk acresDoddaballapura, DistrictBangalore Rural (Karnataka),(29AKA0026956)

37. Sh. Abhishek Ravi Toravi, South Zone Cultivation ofSurvey No. 19411, Village (Sr. No. 10) Grape In 11.00Shegunasi, Taluka acresBabaleshwara, Dis!.Vijayapura (Karnataka),(29AKA0026960)

38 Sh. Irabhadrayya S/o South Zone Cultivation ofMuddayya Salimath & (Sr. No. II) Lemon In 10.00Parvathibai W/0 Irabhadrayya acresSalimath, Survey No. 30/3,30/4, Village Chikka Allapura,Taluka Sindagi, Dis!.Bijapura-(Karnataka),(29AKA0026966)

39. Mr. Prakesh A. Poojari & South Zone Cultivation of Constitution may beother-I, Survey No. 245/2+1, (Sr. No. 12) Grape In 11.00 changed from245/2+2, & 245/2+3, Village acres individual to jointNandaragi,Taluka applicant and name ofChadachana, Dist. Bijapur Sm!. Godavari Poojari(Karnataka), may be add In the(29AKA0026882) proposal.

40. Mrs. Sridevi Shetkar, Survey South Zone Cultivation ofno. 241/2, 241/2A, Village (Sr. No. 13) Mango In 08.24Kadwad, Taluk: Bidar, acresDistrict: Bidar, (Karnataka),(29AKA0026893) ,

71Page fY\\~\~, \1

41. Sh. Vinay Ram M.R., Survey South Zone Cultivation ofNo. 122/* , Village (Sr. No. 14) Capsicum underKarimuddenahalli, Bilikere Poly house in 10000Hobli, Taluk: Hunsuru, sqm.District Mysore (Karnataka),(29AKA0026955)

42. Sh. N. Sadashiva, Survey no. South Zone Protected206/1 C & 206/10, Village - (Sr. No.-15) Cultivation ofUnisenatham, Taluka- Gerbera in 10000Denkanikottai, Dist - sqm under polyKrishnagiri, Tamil Nadu house(33ATNOO06715)

43. Smt. S Nagaveni, Survey no. South Zone Protected79/3, Vi llage-Baliganapalli, (Sr. No.-16) Cultivation ofTaluk- HosurDist - Capsicum in 7000Krishnagiri, Tamil Nadu sqm under poly(33ATN0006711) house

44. Smt. S Nithyapriya, Survey South Zone Protectedno. 907/4A, Village - (Sr. No.-17) Cultivation ofErudukottai, Taluk- Capsicum in 3200Denkanikottai, Dist- sqm under polyKrishnagiri, Tamil Nadu house(33ATNOO06714)

45. Mis Chandi Cold Store, North Zone For expansIon of With the condition thatKhasra no. 2/5, Village- (Sr. no. 01) cold storage CS term loan for theBahadurpur, Post- Gangsara, Type-1 with nos. 2 proposed projectTehsil-Powayan, Distt.- chambers a total would be availed fromShahjahanpur (UP) capacity 2627 MT.

same bank from which(09BLKOCSOO0330)loan has been availedfor the existing facilityand property IS

mortgage.

46. Mis Shanti Devi Ice & Cold North Zone Construction of newStorage, Khasra no. 227, Gata (Sr. no. 02) cold storage CSno. 169, Village-Pala Chand, Type-l with nos. 4Tehsil-Khair, Distt.-Aligarh chambers a total(UP), (09BLKOCSOO0328) capacity 7515 MT

47. Shri Syed Anwar Abbas Sio North Zone ProtectedLate Syed Afadul Hasan, (Sr. no. 03) cultivation ofKhasraiKhatoni/Gat/Survey Cucumber underno. 255 B, Village- Amethiya shade net house inSalempur, Taluka & Distt. an Area of 2600Lucknow (UP) sqm.

~(09BLKOO05233)

~\~

8JPage

48. MIs Soraon Cold Storage, North Zone For setting up With the condition thatKhasra no. 95 I, 952, 968, (Sr. no. 08) of Solar Plant term loan for theVPO-Soraon, Sikandara Road, capacity 100 KW proposed projectDistt.-Allahabad (UP) would be availed from(09FVROCSOOOO06) same bank from which

loan has been availedfor the existing facilityand property ismortgage.

49. Mrs. Usha Sehrawat, Khewat North Zone Cultivation ofno. 2, 163, 165, Village- (Sr. no. 23) Button MushroomJanachauli, Taluka- Hathin, with capacity of 100Distt. Palwal (Haryana) MT(06AHROOO1599)

50. Shri Abdul Gaffar Lohar, North Zone ProtectedKhasra no. 723/1, 723/2, (Sr. no. 30) cultivation of724/1, 725/1 , 726/1, 72613, Cucumber under727/2, Village-Bigod, Patwar Shade Net House inHalka-Bigod, Tehsil- an Area of 8000Mandalgarh, Distt.-Bhilwara sqm(Rai)(08ARJOO06359)

51. Shri Shantilal Dugar, Khasra North Zone Protectedno. 506, 507/1, Village- (Sr. no. 31) cultivation ofTantiawadi, Taluka Amer, Capsicum underDistt. Jaipur (Rajasthan) poly house In an(08ARJOO06369) Area of 8000 sqm

52 Shri Jugal Kishor Jhanwar S/o North Zone ProtectedSh. Shyam Sundar Jhanwar, (Sr. no. 32) cultivation ofKhasra no. 94/2, Village- Cucumber underManaklao, Taluka & Distt. Poly House in anJodhpur (Rajasthan) Area of 9000 sqm(08ARJOO06373)

53 Sh. Santosh Sharma S/o Sh. North Zone ProtectedNarayan Lal Sharma, Khasra (Sr. no. 33) cultivation ofno. 1047, 1048, Village- Cucumber underJahota, Taluka-AInber, Distt.- Poly house in anJaipur (Rajasthan) Area of 4000 sqm(08ARJOO06374)

54 Mrs. Tipu Devi, Khasra no. North Zone Protected444/335, VilIage- Dalanada, (Sr. no. 34) cultivation ofTehsil-Shiv, Distt. Barmer Cucumber under(Raj asthan) shade net house in(08ARJOO06380) an Area of 2600

SQm55 Shri Akash Chander Prakash North Zone Protected Entry of lease deed in

Malik, Khasra no. 7/2, 14/17 (Sr. no. 46) cultivation of ROR before GOC,& 24, Village Dera Mandi, Cucumber under Those statesl areaTehsil- Meharuli, New Delhi Poly house In an where registered lease(07ADLOOOO098) Area of I 0500 sqm.

~eds are not entered- --- ._- \,.1. ~~1P91Page ~,\1\\

,I in the record of right(ROR), a certificate tothis effect from theconcerned StateRevenue Authorityshall be submitted bythe applicant.

56 Smt. Usha Malik, Khasra no. North Zone Protected13, 18 & 23 Village- Dera (Sr. no. 47) cultivation ofMandi, Tehsil- Meharuli, Tomato under PolyNew Delhi (07ADLOOOO097) house in an Area of

9400 som.

(B) Clarification sought <Deferred) ProjectsPPAC discussed the following project proposals in the light of contents of agenda notes and schemeguidelines. PPAC decided that proposal may again be placed before PPAC, after obtaining required lackinginformation/ clarification/documents, as indicated against each project, it was also decided that theinformation/clarification may be sought by giving 30 days time period Zone Concerned/Center In-charge willexpeditiously follow up with the applicant.

Sr. Name ofthe project and &No. project code

1. Mr. Bhausaheb Kisan Pagere,Gat No - 146, At/Post -Nandgaon Budruk, Taluka -19atpuri, Dist - Nashik (MH)(27DMHD047499)

2. Mr. Gangadhar ArjunN irbhavane& Other - 0 I, GatNo 103, At/Post - Mangrul,Taluka - Chandvad, Dist -Nashik(MH)(27DMHD047539)

Volume and Sr. No. ofAgenda Notes

West Zone(Sr. No - 02)

West Zone(Sr. No -04 )

10 I P age

Lacking information/Clarification/documents to be sought.

Re-examination by Zone m view ofKCC/cash credit burden on project land.

I. IPA application duly singed byapplicant on each page required.

2. Proposed land is in the name ofMr. Gangadhar AJjunNirbhavane only, whereas IPAapplied for two names,clarification required.

3. Constitution mentioned IS

Individual in IPA application,whereas application m twonames, clarification required.

4. IPA applied for generalcategory, whereas SC castcertificate copy is enclosed,clarification required.

5. IPA applied for cultivation ofcapsicum under shade net house;whereas DPR submitted forcultivation of capsicum underpoly hou~7 clarificationreauired. \1

3.

4.

M/s, Himalaya Cold Storage,At- Plot No - K 94, MIDCJalgaon, Taluka and Dist -Jalgaon(MH)(27DMHDCS000035)

M/s Hi-Tech Agri Services,Gat No - 673/2, At/Post -Mangrul, Taluka - Amalner,Dist - Jalgaon (MH)(27DMHDCS000034)

West Zone(Sr. No -05 )

West Zone(Sr. No - 06 )

lllPage

6. TechnicalSpecification/Standards mprescribed format of NHB,required.

7. Revised implementationschedule to start the projectwork (with months & year) afterreceipt of grant of clearancefrom NHB required.

1. Certified copy of Aadhaar card,PAN Card & voter ID of allPartners required.

2. Certified copy of landdocuments (ROR) in the nameof partnership firm and proposedland should be free from anyburden.

3. Required revised basic datasheet, as per proposedcommodities to be stored asmentioned in DPR.

4. Certified copy of proposed sitelayout plan (Blue print) preparedby Chartered Engineer dulyapproved by approvmgauthority.

5. Revised implementationschedule to start the projectwork (with months & year) afterreceipt of grant of clearancefromNHB.

6. If proposed land is anagriculture land than land titleshould be change for industrialpurpose.

As this is an expansion of cold storageproject so proposed bank for availingterm loan, should be the same, whereterm loan for 1st project was availed.Capacity of exiting cold storage.

I. Certified copy of registrationcertificate of the Partnershipfirm is required.

2. Certified copy of complete landdocuments, required.

3. Undertaking in NHB prescribedformat is required.

4. Certified copy of change ofLand Use (CLU) for industrialpurpose, required.

5. Revised implementationschedule to start the projectwork (with months & year) after

Mrs. Sunaina AshishWankhede, Gat no - 153&98,At/Post - KhairiDeshmukh(PardiDesh), Taluka -Kalmeshwar, Dist -Nagpur,MH (27CMHC039998)

Mr. Ketan Ramesh Godase,Survey/Gat No. 423/A/2,Village - Saundane, Taluka -Mohol, District - Solapur(MH)- (27BMHB048542)Mr. Anil Tukaram Jambhale,Survey/Gat No. 38, Village -Chavanwadi, Taluka - Ajara,District - Kolhapur (MH) -(27BMHB048540)Mr. Suresh Govind Vagadia,Survey/Gat No. 78, Village -Reldi Nani, Taluka - Bhuj,District - Kutch (Gujarat)(24AGJOO10492)

5.

6.

7.

8.

9.

Mr. ShivajiraoBhosale& Other 1,159, At/Post -Mhalungi, Taluka -Dist - Nashik(27DMHD047538)

BhauraoGat no -Kadwa

Dindori,(MH)

West Zone(Sr. No -07 )

West Zone(Sr. No - 18 )

West Zone(Sr. No. 12)

West Zone(Sr. No. 17)

West Zone(Sr. No. 24)

12 I P age

receipt of grant of clearancefrom NHB, Reauired.

1. Certified copy of TSP areanotification, required.

2. Clarification about name i.e.Mrs. Chandrabhagabai and Mrs.Chandraprabha pertains to sameperson, is required.

3. Revised implementationschedule to start the projectwork (with months & year) afterreceipt of grant of clearancefrom NHB, Reauired.

1. Undertaking in NHB prescribedformat, required.

2. Certified copy of landdocuments, required.

3. Cost of Drip irrigation system[lot mentioned in DPR, whereasas per scheme guideline dripirrigation IS essentialcomponent. Without dripirrigation project is not eligibleunder the scheme.

4. Revised implementationschedule to start the projectwork (with months & year) afterreceipt of grant of clearancefrom NHB, required.

5. If applicant is one or few of jointowners of project land thenNOC from other co-ownersindicating share of each co-owner is reauired.

Pre-inspection report from DD, NHB,Pune (MH) required beforeconsideration of the proposal.

Pre-inspection report from DD, NHB,Pune (MH) required beforeconsideration ofthe proposal.

The proposed project land is alreadymortgaged for other activity. As perNHB scheme guidelines, the proposedproject land should be free from anyburden (boja). Therefore, fresh RORrequired after removing of burden(Boja).

10. Mr. Kerasiya DevrajbhaiLakhmanbhai, Survey/GatNo. 178, Village - Habay,Taluka - Bhuj, District -Kutch(Gujarat)(24AGJOOI0497)

II. Mr. Arvind LakhmanKerasiya, Survey/Gat No.178, Village - Habay, TalukaBhuj, District - Kutch(Gujarat) (24AGJ0010496)

12. Mr. Kerasiya LakhmanbhaiDevkaranbhai, Survey/GatNo. 178, Village - Habay,Taluka - Bhuj, District -Kutch(Gujarat)(24AGJOOI0494)

13. M/s Landmark DevelopersPvt Ltd, director - Mr.Ravindra Singh Kushwaha,Kh no. - 196, 276, at -Nydram, Tel - Abhanpur,Dist - Raipur (CG)(22 ACGOOO1208)

14. Shri Birju Ram Mandavi &others, At - village - BuikiJunganar, Tahsil - Keshkal,Dist - Kondagon (CG)(22ACG0001220)

15. Shri Chhedan Lal Poyam &others, At village - Katagaon,Tahsil - Makdi, Dist -Kondagaon (CG)(22ACGOOO1221)

West Zone(Sr. No. 25)

West Zone(Sr. No. 26)

West Zone(Sr. No. 27)

East Zone(Sr. No. 01)

East Zone(Sr. No. 02)

East Zone(Sr. No. 03)

13IPage

NOC signed by all other co-owner of theproposed project land is required.

NOC signed by all other co-owner of theproposed project land is required.

NOC signed by all other co-owner of theproposed project land is required.

I. Re-submission of Undertakingfrom Promoter.

2. Re - Submission of DetailProject Report with means offinance.

3. Authorization of company foravailing the NHB subsidy.

4. Revised implementationschedule. As per IPA schemeguidelines project will be startafter received of Grant ofClearance.

I. Re-submission of Undertakingfrom Promoter

2. Revised implementationschedule. As per IPA schemeguidelines project will be startafter received of Grant ofClearance.

1. As per IPA application applicantavailed the subsidy/soft loanfrom NHB or other CentralGov!; or any Agencies for whichdetails of the earlier subsidy notprovided by the applicant.

2. Submitted IPA application, oneof the names of applicant IS

Sobha singh, but in project landin the name of Sop singh. Pleaseclarify it. ,

.~ \~\ }..l)v>

16 Sh. Chandrashekhar BhartiAt Kh no J 755/3, village -Khopli, Tel- Durg (CG)(22ACGOOO1228)

17. Shri Sachin Singh KushwahaAt village - Cholnar, Tahsil-Jagdalpur, Dist - Bastar (CG)(22ACGOOO1238)

18. Smt. Shashi Rathi w/o KamalKishor Rathi, At village -Madhi, Tal - Tilda, Dist -Raipur (CG)(22ACGOOOJ 240)

19. Shri. Kamal Kishor Rathi s/oSuraj Mal Rathi, At village -Madhi, Tal - Tilda, Dist -Raipur (CG),(22ACGOOO1239)

20. Shri. Satyanarayan JenaSurvey no. 217/240, village -Aragul, Taluka - Jatani, DistKhordha (Odisha)(2 1AOR0002964)

East Zone(Sr. No. 04)

East Zone(Sr. No. 05)

East Zone(Sr. No. 06)

East Zone(Sr. No. 07)

East Zone(Sr. No. 16)

141Page

1. As per IPA application applicantavailed the subsidy/soft loanfrom NHB or other CentralGovt. or any Agencies for whichdetails of the earlier subsidy notprovided by the applicant.

2. The applicant is one but jointowners of project land thenNOC from other co-ownersindicating share of each co-owner to be submitted.

3. Revised implementationschedule. As per IPA schemeguidelines project will be startafter received of Grant ofClearance.

1. As per IPA application applicantavailed the subsidy/soft loanfrom NHB or other CentralGovt. or any Agencies for whichdetails of the earlier subsidy notprovided by the applicant.

2. Project land ownership in thename of applicant with clearsurvey no or olot is reouired.

Hard copy of Land documents, technicalstandard / specification, Pan Card,Aadhar card, Detail Project Report,Undertaking duly signed by theaoolicant are reuuired.

1. Hard copy of Land documents,technical standard /specification, Pan Card, Aadharcard, Detail Project Report,Undertaking duly signed by theapplicant are required.

2. Submitted IPA application in thename of applicant is KamalKishor Rathi, but in name ofland document Kamal Kishore.Please clarify it.

1. Photo with signature on IPAapplication is required.

2. Signature of applicant in eachpage of IPA application andother relevant documents IS

required.3. Land measuring area as per deed

1.14 acre or 4560 sqmt, whereas in IPA appl ication proposedarea under poly house 5600

\[

~'\1'\\~\}l>v:>

21.

22.

Smt. Rajlaxmi ParidaSurvey no. 72, village -Nayakateni, Taluka - Gandia,Dist - Dhenkenal (Odisha)(21AOR0002968)

Mrs. Sun ita Sagar, Survey no.463/399/1/1, Village -Jamusar Kalan, Tehsil -Berasia, Distt.- Bhopal (MP)(23AMP0007090)

East Zone(Sr. No. 17)

East Zone(Sr. No. 23)

lSIPage

sqmt for Rose cultivation.4. Submit the undertaking from

promoter.S. Detailed Project Report (on the

suggestive lines of NHB ModelDPR Templates is required.

6. Technical standard /specification in prescribedfonnat ofNHB are required.

7. Revised implementationschedule. As per IPA schemeguidelines project will be startafter received of Grant ofClearance.

1. Photo with signature on IPAapplication is required.

2. Signature of applicant in eachpage of IPA application andother relevant documents isrequired.

3. Registered land lease with clearsurvey no. and plot on the nameof applicant and entry in RoRwith latest record of selfattested. Applicant has also;submit the English version ofthe same self attested.

4. Submit the undertaking frompromoter.

S. Detailed Project Report (on thesuggestive lines of NHB ModelDPR Templates is required.

6. Technical standard /specification In prescribedfonnat ofNHB are required.

7. Revised implementationschedule. As per IPA schemeguidelines project will be startafter received of Grant ofClearance.

I. Project land in the name of Jointowners, NOC from others co-owner is required.

2. Technical standard /specification of Shade net housein prescribed format of NHB isrequired.

3. Revised implementationschedule to start the projectwork (with months & year) i.e.after receipt of grant ofclearance f,om NHB.

~~~yl

23. Mr. Rajendra Agrawal,Survey/Plot Nos.- 66, 67 &68, Spice Park, Village -Mavan, Tehsil - Guna, Distt.-Guna(MP)(23AMPOCS000057)

24. M/s Kissan Sheet Grih (RAO)Pvt. Ltd, Survey No.- 750, A.B. Road, Village - Rao,Tehsil - Indore, Distt.- Indore(MP), (23AMPOCS000060)

East Zone(Sr. No 25)

East Zone(Sr. No. 26)

16) P age

I. Hard copy of IPA applicationduly signed by the applicant oneach pages is required.

2. Land record (namely P-II and B-I) from revenue department inthe name of the applicant IS

required.3. Lease has been executed

between spices board andapplicant on dated 27.07.2015and It is clearly mentioned onterms and condition at Page no.15 and sr. no VIthat "the lessee shall not use andoccupy the plot for any purposesother than production /manufacturing of spices / spicebased products and such otheractivities connected with thespices" change in land use forproposed cold storage isrequired.

4. Please provide the details ofexisting project with capacityand subsidy availed, if any.

5. Hard copy and soft copy ofBasic Data Sheet in prescribedformat ofNHB is required.

6. Revised implementationschediJle to start the projectwork (with months & year) Le.after receipt of grant ofclearance from NHB.

I. As per the proposedimplementation schedule,activity is completed at the timeof IPA applied to NHB. Pleaseclarify it.

2. IPA application duly signed oneach pages by the applicant isrequired.

3. As mentioned in IPA applicationassistance in the form of softloan and subsidy has beenavailed by the beneficiaryincluding family (husband / wifeand minor children) and as legalentity (refer detailed guidelines)earlier from the NHB and thedetails are required.

4. Memorandum of Associationduly s~ I & signed in each pages

25. Mis Balaji Wafers Pvt. Ltd.,Survey/ Plot no.- 2 to 5Industrial area SoneyBhenslay, Tehsil - Mhow,Distt.- Indore (MP)(23AMPOCS000061)

26. Mr. Hari Patidar, Survey no.116/2/kh/3, Village -Jajamkhedi, Tehsil -Manawar, Distt.- Dhar (MP)(23AMP0007093)

East Zone(Sr. No. 27)

East Zone(Sr. No. 29)

17IPage

by the applicant is required.5. Undertaking IS required from

promoter as per prescribedformat of NHB with projectlocation, activity and capacity.

6. Detail Project Report (on thesuggestive lines of NHB modelDPR Templates) is required.

1. As per amendment lease dated10.09.2014, it IS clearlymentioned on sr. no 4 that theland to be used for themanufacturing of Wafers &Namkeens purposes, whereasproposal submitted for ColdStorage. Change in land use forproposed cold storage IS

required.2. Undertaking is required from

promoter as per prescribedformat of NHB with projectlocation, activity and capacity.

3. Self -attested copy of RoR withlatest record and lease entryshould be entered in the name ofcompany in RoR is required.

4. Soft copy of Basic Data Sheet inprescribed format of NHB isrequired.

5. Site layout plan in (blue print) ofthe propose project location isnot readable, hard copy of freshsite layout plan is required.

6. Revised implementationschedule to start the projectwork (with months & year) i.e.after receipt of grant ofclearance from NHB.

I. Submit the Technical Standard /specification of Shade net housein prescribed format ofNHB.

2. Undertaking. is required frompromoter as per prescribedformat of NHB with projectlocation, activity and area.

3. Revised implementationschedule to start the projectwork (with months & year) i.e.after receipt of grant ofclearance lrom NHB.

27. Mr. Jagannath Singh, Surveyno. 5711 & 57/3, Village -Nimi, Tehsil - Patan, Distt.-Jabalpur (MP)(23AMP0007094)

28. Mr. Mahesh Patidar, Surveyno. 98/3, Village - Dewla,Tehsil - Manawar, Distt.-Dhar (MP)(23AMP0007095)

29 Mr. Naveen Barfa S/o SureshBarfa, Survey no.208/1/2111111/1/1, Village -Gandhwani, Tehsil -Gandhwani, Distt.- Dhar(MP), (23AMP0007098)

East Zone(Sr. No. 30)

East Zone(Sr. No. 31)

East Zone(Sr. No. 32)

181 P age

I. Undertaking is required frompromoter as per prescribedformat of NHB with projectlocation, activity and area.

2. The area mentioned on technicalStandard / specification ofShade net house not matchedwith area proposed on IPAapplication. Please clarify it.

3. Revised implementationschedule to start the projectwork (with months & year) i.e.after receipt of grant ofclearance from NHB.

I. Undertaking IS required frompromoter as per prescribedformat of NHB with projectlocation, activity and area.

2. Submit the Technical Standard /specification of Shade net housein prescribed format ofNHB.

3. The measuring areas not clearon proposed survey no. 98/3.Please self -attested copy of B-1or a certificate from landrevenue authority required.

4. Revised implementationschedule to start the projectwork (with months & year) i.e.after receipt of grant ofclearance from NHB.

I. As per submitted IPAapplication the applicant name isMr. Naveen Barfa, however,project land is found in the nameonly Mr. Naveen. Please clarifyit.

2. As per land record land in Jointownership, NOC from others co-owners is required.

3. As per IPA application theapplicant informed /mentionedthat he has availed thesubsidy/soft loan earlier fromNHB & other Central Govt. orany Agencies. Details of availedsubsidy/soft Joan is required.

4. Revised implementationschedule to start the projectwork (with months & year) i.e.after receipt of grant ofclearaq e from NHB.

30

31

Mrs. Sundarbai W/0 Mr.Narayan, Survey no. 154,Village - Kalwani, Tehsil -Manawar, Distt.- Dhar (MP)(23AMP0007099)

Mr. Mangilal Kag S/o KaisajiKag, Survey no. 47/1, Village- Segawan, Tehsil - Barwani,Distt.- Barwani (MP)(23AMP0007101)

East Zone(Sr. No.33)

(East Zone)(Sr. No.34)

I . Original copy of Undertaking isrequired.

2. Original copy of the technicalstandard / specification of Shadenet house duly signed byapplicant is required.

3. The IPA application in the nameof applicant is Sundarbai, but inAadhar card 'name of applicantIS Sundarbai Barfa. PleaseclarifY it.

4. As per IPA application theapplicant informed /mentionedthat he has availed thesubsidy/soft loan earlier fromNHB & other Central Gov!. orany Agencies. Details of availedsubsidy/soft loan is required.

5. Revised implementationschedule to start the projectwork (with months & year) i.e.after receipt of grant ofclearance trom NHB.

I. As per submitted IPAapplication the applicant name isMr. Mangilal Kag, however,project land is found in the nameonly Mr. Mangilal. Pleaseclarify it.

2. As per the IPA application,applicant informed /mentionedthat he has availed thesubsidy/soft loan earlier fromNHB & other Central Govt. orany Agencies. Details of availedsubsidy/soft loan is required.

3. Revised implementationschedule to start the projectwork (with months & year) i.e.after receipt of grant ofclearance from NHB.

32 Mr. Dinesh Kumar Shukla,Survey no. 460/3/4, Village -Khangarh, Tehsil - Kothi,Distt.- Satna (MP)(23AMP0007102)

East Zone(Sr. No. 35)

19 I P age

J. Undertaking from promoter asper prescribed format ofNHB isrequired.

2. Technical Standard/specification of Shade net houseis prescribed format of NHB isrequired.

3. Revised implementationschedule to start the projectwork (with months & vear) i.e.

'~,4">P

33 Mr. Vimal Jain Sio KantilalJain, Survey nos. 780 & 781,Village - Kanawati, Tehsil -Neemuch, Distt.- Neemuch(MP), (23AMP0007109)

34 Smt. Rajashri W10 SiddaramaKoganoor, Survey No. 94/2,Village Makanapura, TalukaBijapura, Dist. Bijapura-586103, (Karnataka),(29AKA0026946)

35 Mis Narmada Nandamuri, Sy.No. 510, Village- Kodumuru,Taluka-Chinthakani, Dist-Khammam, Telangana(37TTGOCS000052)

East Zone(Sr. No. 36)

South Zone(Sr. No. 03)

South Zone(Sr. No.-18)

20lPage

after receipt of grant ofclearance from NHB.

1. As per submitted IPAapplication the applicant name isMr. Virna! Jain, however, nameof applicant not match withproject land documents &Aadhar card. Please clarify it.

2. Undertaking from promoter asper prescribed format of NHB isrequired.

3. Technical Standardlspecification of Shade net houseis in prescribed format of NHBis required.

4. Revised implementationschedule to start the projectwork (with months & year) Le.after receipt of grant ofclearance from NHB.

I . As per land documents it isobserved that project land IS

joint names whereas IPAapplication received in thesingle name for total land. Ifapplicant is one or few of jointowners of project land thenNOC from others co-owners besubmitted indicating the share ofeach co-owner in proposedSurvev number ofland.

1. Certified copy of Change of Landuse (CLU) from industrial purpose.

2. NOC from Local Bodies like GramSabha/MC etc.

3. Undertaking in prescribed format ofNHB.

4. Certified Copy of Land documentsin the name of applicant of PallaPassbook & Certificate ofEncumbrance in local language andits English version.

5. Suggestive lines of NHB modelDPR templates.

6. Site layout plan (Blue print) of thecold storage prepared by chartedEngineer.

7. Soft copy of Basic Data Sheetincluding heat loa~ calculation ofthe cold storage. \

36

37

Shri Ram Kishor Singh S/oOm Prakash Singh, SurveyNo. 272, Village- PaliyaOarowast, Tehsil- Tilhar,Oistt. Shahjahanpur (U.P)(09BLK0005239)

Shrikalyan Ice & ColdStorage Pvt. Ltd., Village-Oaheliya Jaitpur, BewarRoad, Taluka & Oistt.Farrukhabad (UP)(09BLKOCS000332)

North Zone(Sr. no. 04)

North Zone(Sr. no. 05)

211 P age

I. IPA application duly filled signedby applicant on each and everypage.

2. Certified copy of Aadhar card, andVoter id card.

3. Original certified copy ofundertaking !Tom Promoter/Applicant in prescribed format ofNHB.

4. Land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) !TomRevenue Authority and NOC fromothers co-owners indicating shareof each co-owner:

5. Non encumbrance certificate fromRevenue Authority.

6. Land is under mortgaged withbank. As per scheme guideline theproject land should be free from allburdens such as mortgage to 3rdparty. Fresh land documentrequired after clearance ofmortgage,

7. OPR is incomplete. Please submitcomplete OPR on the suggestivelines of NHB Model OPRTemplates duly signed byapplicant on each and every page.

8. Certified copy of Technicalstandard / specification inprescribed format.

9. Physical status of the project, asno work should be started beforegetting IPA.

J. Constitution of the firm is Pvt. LtdCompany. Therefore, as per schemeguidelines land also should be in thename of Company.

2. Company Boards resolution foravailing NHB subsidy and toappoint authorized signatory onbehalf of company.

3. Undertaking is in old format, wemay ask the new undertaking as perNHB prescribed format.

4. The Submitted DPR is incomplete.Please submit Detail Project Report(on the suggestive lines of NHBModel DPR templates) duly signedby the applicant on each pages.

~\\>\ .••""

38. Shri Santosh Kumar SloMunnilal, Shri Satya PrakashSlo Munnilal, Shri JitendraKumar Slo Munnilal, ShriSh ivanand yadav SloMunnilal yadav and ShriSachchidanand Yadav SloMunnilal Yadav, Village-Khandevdev(Bijnor), Tehsil-Sarojini Nagar, Distt.Lucknow (UP)(09BLK0005238)

39. MIs Growmore InternationalLimited, Village- Bilwahar,Rania, Tehsil- Akbarpur,Distt. Kanpur Dehat (UP)(09BLK0005236)

North Zone(Sr. no. 06)

North Zone(Sr. no. 07)

ZZIPage

5. Self declaration regarding details ofbenefits already availed ITomNHB,NHM and Central ministries relatedto Horticu Iture projects if any inprescribed format.

6. Physical status of the project, as nowork should be started beforegetting IPA.

7. Expert ITom empanelled list may benominated for Technical Scrutiny ofBasic Data Sheet.

8. Pre-inspection may be conducted.

I. Activity under the project ispoly house in 4000 sqm andshade net house in 4000 sqm. forcultivation of Cucumber.

2. Submitted detail project reportdoes not have the financialparameter of the project whichmay kindly be provided.

3. Land is under mortgaged withBank. As per scheme guidelinethe project land should be ITeefrom all burdens such asmortgage to 3rd party. Freshland document required afterclearance of mortgage.

4. Land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromRevenue Authority and NOCfrom others co-ownersindicating share of each co-owner.

5. Physical status of the. project, asno work should be started beforegetting IPA.

I. IPA application in the name ofMIs Growmore InternationalLimited but registrationcertificate in the name of MIsGrowmore International LeatherPvt. Limited. Please clarify.

2. OPR is incomplete. Pleasesubmit complete DPR on thesuggestive lines of NHB ModelDPR Templates duly signed byapplicant on each and everypage.

3. Technical standard Isoecification in orescribed

~ vV~'\1\\'l\y6\

40 Shri Anikesh Chandra Gupta,Village- Sagra, Tehsil-Lalganj, Oistt.-Mirzapur (UP)(09FVR0000034)

North Zone(ST. no. 09)

format.4. Non Encumbrance Certificate of

project land showing that land isfree from all burdens such asmortgage to 3'" party.

5. Certified copy of Project Landownership in the name ofApplicant with clear survey No.and Plot or entry in RoR withlatest record self-attested(Mutation).

6. Physical status of the project, asno work should be started beforegetting IPA.

I. As per guideline of NHB onlytwo crops are allowed.Accordingly revised your IPAapplications and project report.

2. Land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromRevenue Authority and NOCfrom others co-ownersindicating share of each co-owner with English version.

3. Please submit the fresh DPRwith financial parameter on thesuggestive lines of NHB ModelOPR Templates duly signed byapplicant on each and everypage.

4. Physical status of the project, asno work should be started beforegetting IPA.

41 MIs Dayal Agrotech IndiaPrivate Limited, Village-Sujanipur Hathgam, Taluka-Khaga, Oistt.- Fatehpur (UP)(09FVROCS000007)

North Zone(Sr. no. 10)

231Page

I. IPA application duly signed byapplicant on each and everypage.

2. Undertaking is in old format,please provide new undertakingas prescribed by NHB format.

3. Company Boards resolution foravailing NHB subsidy and toappoint authorized signatory onbehalf of company.

4. Constitution of the applicant isPvt. Ltd. Company. As perscheme guideline land should bein the name of company andentry in RoR with latest recordself-attested.

5. Certified CODV of Encumbrance

" 'Vi>~~\\~').-b

42 MIs Maa Yashoda Agro Fann(Prop. Amit KumarJayaswal), Yillage-PurviTiwari Tola, Taluka-Rudrapur, Distt.-Deoria (UP)(09FYR0000035)

North Zone(Sr. no. 11)

24 I P age

certificate. As per guideline theproject land should be free fromany burden such as mortgage to3" party.

6. The Submitted DPR isincomplete. Please submit DetailProject Report (on thesuggestive lines of NHB ModelDPR templates) duly signed bythe applicant on each pages.

7. Self declaration regardingdetai Is of benefits alreadyavailed from NHB, NHM andCentral ministries related toHorticulture projects if any inprescribed fonnat.

8. Soft copy of Basic data sheetwith heat load calculation on E-mail id [email protected],[email protected]

9. Physical status of the project, asno work should be started beforegetting IPA.

10. Expert from empanelled list maybe nominated for TechnicalScrutiny of Basic Data Sheet.

11. Pre-inspection may beconducted.

I. Committee noted that anotherproject bearing code no.09FYR0000033 has also beenapplied for the same activity i.e.setting up Mushroom Unit withcapacity of 80 MT. Thereforeapplicant may be infonned tosubmit one proposal as NHBsubsidy maximum ceiling is Rs.30.00 lakh per project.Accordingly applicant maywithdraw one projectaccordingly. Followingdocuments are found lacking:-

2. IPA application duly filled andsigned by applicant on each andevery page

3. Certified copy of DPR withfinancial parameter on thesuggestive lines of NHB ModelDPR Templates duly signed byapplkant on each and everypage.

4. Land is on lease (registered),

~\\,\ ..~

43 Mis Maa Vaishnav ColdStorage & Ice Factory,Village-Harakpur, Taluka-Soraon, Distt.- Allahabad(UP), (09FVROCS000008)

North Zone(Sr. no. J 2)

251Page

entry in RoR showing is fact isrequired. Those states whereregistered lease deeds are notentered in the records of right, acertificate to this effect from theconcerned state's revenueauthority shall be submitted.

5. Land documents showing thefacts related to ownership oflessor of land.

6. Certified copy of Encumbrancecertificate. As per guideline theproject land should be free fromany burden from 3rd partymortgage.

7. Lav out of Dlant of Droiect.J. Undertaking is in old format,

please provide the newundertaking as per NHBprescribed format.

2. Please clarify that Smt.Manorama Tiwari & ManoramaDevi.

3. Project land mutation is requiredin the name of applicant withclear survey no. and plot.

4. The Submitted DPR isincomplete. Please submit DetailProject Report (on thesuggestive lines of NHB ModelDPR templates) duly signed bythe applicant on each pages.

5. Site layout plan (Blue print).6. Self declaration regarding

details of benefits alreadyavailed from NHB, NHM andCentral ministries related toHorticulture projects if any inprescribed format.

7. Soft copy of Basic data sheetwith heat load calculation on E-mail id [email protected],[email protected] .

8. Expert from empanelled list maybe nominated for TechnicalScrutiny of Basic Data Sheet.

9. Pre-inspection may beconducted.

old format,the newper NHB

44. Mrs. Ratan Devi BhanwarSingh, Village- BarobaraKalon, Taluka- Fatehabad,Distt.-Agra (UP)(09CBT0004340)

45. Mrs. Sonika Anand, Village-Validpur Pargana, MataurPargana, Tehsil- Sardhana,Distt. Meerut (U.P)(09CBT0004339)

North Zone(Sr. no. 13)

North Zone(Sr. no. 14)

26 I P age

J . Land is under mortgaged withCanara Bank, Shamshahbad. Asper guideline the project landshould be free from any burdensuch as mortgage to 3'd party.Please submit the fresh landdocument after clearance ofmortgage.

2. Physical status of the project, asno work should be started beforegetting IPA.

1. Constitution mentioned 111 jointpromoter, however applicant isindividual.

2. Land has been declared as nonagriculture land as per landdocuments by the order ofDistrict Magistrate. Pleaseprovide NOC from the office ofDM for setting up of Mushroomproject.

3. IPA application land ownershipmentioned owned. But leasedeed submitted by promoter inthe name of applicant.

4. Moreover, land is leased out bySh. Virendera Singh. Pleaseprovide the land document in thename of Sh. Virendra showingownership of land. As landdocument submitted alongwithapplication are for differentperson.

5. Undertaking is 111

please provideundertaking asprescribed format.

6. Certified copy of registered landlease with clear survey and plotno. on the name of applicant andentry in RoR with latest recordself attested. Those states whereregistered lease deeds are notentered in the records of right, acertificate to this effect from theconcerned state's revenueauthority shall be submitted.

7. Land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromRevenue Authority and NOC

\ ,,0~A~-yb\ \,'W

47. Shri. Devan Kumar Thakur,Village- Nagali, Tehsil- Anni,Distt. Kullu (H.P)(02AHP0004609)

46. Shri Raghuveer Singh AmarSingh, Village- BarauliGoojar, Taluka- Agra, Distt.-Agra (UP), (09CBT0004336)

48. Shri Bansi Lal,Ghoond, Tehsil-Distt.- Shimla (HP)(02AHP00046 I0)

Village-Theog,

North Zone(Sr. no. 15)

North Zone(Sr. no. 16)

North Zone(Sr. no. 17)

27 I P age

from others co-ownersindicating share of each co-owner.

8. Physical status of the project, asno work should be started beforegetting IPA.

1. IPA application nameRaghuveer Singh Amar Singhmentioned in IPA application.However Adhaar Card ismentioned in Raghuveer. Pleasec1ari/)'

2. DPR does not have financialparameters.

3. Please confinn whetherRaghuveer Singh Amar Singh isthe same person or nowindividuals as shown In landdocuments ..

4. Please provide fresh copy ofland document i.e.Khasra/Khatoni!G irdawari.

5. Physical status of the project, asno work should be started beforegetting IPA.

I. Applicant has submitted the IPAapplication without signature.

2. IPA application is not dulyfilled.

3. As per land record in the nameof promoter Sh. Devan insteadof Devan Kumar Thakurmentioned in IPA application.May kindly be clarified.

4. Physical status of the project, asno work should be started beforegetting IPA.

I. IPA application duly filled &singed on each page.

2. Undertaking from promoter!applicant in prescribed fonnat.

3. Land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromRevenue Authority and NOCfrom others co-ownersindicating share of each co-owner.

4. Land is under mortgaged withBank. As per guideline theproject land should be free fromanv burden from 3rd oartv

49. Shri Jalap Ram, VPo-Kandagai, Tehsil- Anni, Distt.Kullu (HP), (02AHP0004611)

North Zone(Sr. no. J 8)

mortgage. Please submit thefresh land document afterclearance of mortgage. Pleaseinform the type of loan availedon land whether KCC or termloan.

5. Physical status of the project, asno work should be started beforegetting IPA.

J • Land is under mortgaged withBank. As per guideline theproject land should be free froman; burden such as mortgage to3' party. Please submit the freshland document after clearance ofmortgage.

2. Land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromRevenue Department and NOCfrom others co-ownersindicating share of each co-owner with signature.

3. As per implementation schedule& proposed activity is notmentioned year. Please clariry.

4. As submitted IPA applicationpromoter name is Shri JalapRam and as per Adhar Card &Pan Card Jalap Ram Thakur.Please clariry.

5. Please confirm the capacity ofGrading Packing unit.

6. Physical status of the project, asno work should be started beforegetting IPA.

50.

51.

Shri Sanjeev, Village Odd,P.O. Sarog, Tehsil Theog,Distt. Shimla (HP)(02AHP00046 I2)

Smt. Varsha Nahar, Village -Mauja Chand hat, Tehsil &Distt.- Palwal (HR)(06AHROOO1598)

North Zone(Sr. no. 19)

North Zone(Sr. no. 20)

281Page

I. As per NHB guidelines projectm open field condition areaccepted above 5.00 acre ofarea.

2. Accordingly, you may revisedyour project in case having landarea of more than 5.00 acre.

I. Undertaking is in old format,please provide new undertakingas per NHB prescribed format.

2. IPA application IS not dullyfilled.

3. Proposed Survey no. aredeferent as per IPA application& DPR.

4. Phvsical status of the proiect, as. \' . .-

~ ./ 'PO~\1\\')\~

52. MIs Narotam AgricultureFarm, Village- Asmanpur,Tehsil- Pehowa, Distt.Kurukshetra (Haryana)(06AHROOO1597)

53. MIs Wasan Agriculture Farm,Village- Aasmanpur, Tehsil-Pehowa, Distt. Kurukshetra(H.R), (06AHR0001596)

North Zone(Sr. no. 21)

North Zone(Sr. no. 22)

291Page

no work should be started beforegetting IPA.

1. IPA application is not dullyfilled.

2. Land in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromfrom Revenue Authority andNOC from others co-ownersindicating share of each co-owner.

3. Land is under mortgaged withbank. As per scheme gu idelinethe project land should be freefrom all burdens such asmortgage to 3rd party. Freshland document required afterclearance of mortgage. Pleaseprovide Non encumbrancecertificate from RevenueAuthority.

4. Please provide fresh landdocument i.e. copy of NakaiJamabandi, Register lntkal &Khasra Girdawari indicatingproposed Survey no. as per lPAapplication.

5. DPR is incomplete. Pleasesubmit complete DPR on thesuggestive lines of NHB ModelDPR Templates duly signed byapplicant on each and everypage.

6. Physical status of the project, asno work should be started beforegetting IPA.

1. IPA application is not dullyfilled.

2. Land in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromTehsildar and NOC from othersco-owners indicating share ofeach co-owner.

3. Please provide fresh landdocument I.e. copy of NakaiJamabandi, Register Intkal &Khasra Girdawari indicatingproposed Survey no. as per IPAapplication. ,

54. Shri Anil Kumar, Village-Purwala Birsangpur, Tehsil-Laksar, Distt. Haridwar(Uttrakhand)(05AUA0002l82)

55. Shri Naresh Pal Singh Rawat,Village-Barwala, Tehsil-Vikasnagar, Distt. Dehradun(Uttrakhand)(05AUA0002l83)

North Zone(Sr. no. 24)

North Zone(Sr. no. 25)

30lPage

4. Submitted detail project reportdoes not have the financialparameter of the project whichmay kindly be provided.

5. Physical status of the project, asno work should be started beforegetting IPA.

1. As per IPA application promotername is Anil Kumar howeverPan card & Aadhar Cardmentioned in the name of AnilAgrawal. Please clarifY

2. Land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromfrom Revenue Authority withkhasra no. and NOC from othersco-owners indicating share ofeach co-owner.

3. As per NHB scheme guidelineland should be in the name ofapplicant either absoluteownership or registered deed for10 year above with entry mROR.

4. Land is under mortgaged withbank. As per scheme guidelinethe project land should be freefrom all burdens such asmortgage to 3rd party. Freshland document required afterclearance of mortgage.

5. Physical status of the project, asno work should be started beforegetting IPA.

I. As per land record is in thename of Naresh Pal Singhhowever in lPA application inthe name of Naresh Pal Rawatwhich may kindly clarified.

2. As per land document, someportion ofland has been sold outby applicant.

3. Khasra no. 524 minimum isholding area of 404 sqm. only,how proposed mushroom unitcan be set up on such smallpiece ofland.

4. Physical status of the project, asno work should be started beforegetting IP A.

56. Mrs. Yusra Qamar, Village-Hasanawala, Tehsil-Bhagwanpur, Roorkee, Distt.Haridwar (Uttrakhand)(05AUA0002184)

57. Mis Cargo Wharf PrivateLimited, 4/5, Inder Road,Opp. Sharda Nursingh Home,Dalanwala, Dehradun(Uttrakhand)(05AUA0002185)

58. Shri Puran Singh Tomar,Village-Bhimawala, Taluka-Vikasnagar, Distt.- Dehradun(Uttrakhand)(05AUA0002186)

North Zone(Sr. no. 26)

North Zone(Sr. no. 27)

North Zone(Sr. no. 28)

31 I P age

I. As per IPA application promotername is Miss Yusra Qamarhowever Pancard & AadharCard and lease deed mentionedin the name of Yasar QamarSiddiqui. Please clarifY

2. Land is on lease (registered)Entry in RoR showing is fact isrequired. Those. states whereregistered lease deeds are notentered in the records of right, acertificate to this effect from theconcerned state's revenueauthority shall be submitted.

3. IPA application are not dulyfilled.

4. Physical status of the project, asno work should be started beforegetting IPA.

I. IPA application dully filled &signed on each pages withcomponent wise cost.

2. Basic data sheet.3. MoA, BoD resolution permitting

investment proposal.4. Please provide the number of

refer van to be purchased &components wise cost of refervan.

I. IPA application dully filled &signed on each page.

2. Registered lease deed requiredin the name of applicant andentry in RoR showing is fact isrequired. Those states whereregistered lease deeds are notentered in the records of right, acertificate to this effect from theconcerned state's revenueauthority shall be submitted.

3. Lease deed should be registered10 years above as per guidelinefrom the date application.

4. Duly certified copy of landdocuments showing the factsrelated to ownership of lessor ofland.

5. Certified copy of Encumbrancecertificate. As per guideline theproject land should be free fromany burden such .as mortgage to3'd oartv. ~

59. Shri Namit, Village-Salem pur Mahdood, Taluka &Distt.- Hardwar (Uttrakhand)(05AUA0002187)

60. Mrs. Sangeeta Kumawat andother one, Village- Boraj,Tehsil- Dudu (Hq.Mauzamabad), Distt.Jaipur(Raj)(08ARJ0006372)

61. Shri Saitan Singh Arha, VPO-Udd Wayajawal, Taluka &Distt. Sirohi (Rajasthan)(08ARJ000638I )

North Zone(Sr. no. 29)

North Zone(Sr. no. 35)

North Zone(Sr. no. 36)

32(Page

6. Physical status of the project, asno work should be started beforegetting IPA.

1. Land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) tromRevenue Authority and NOCfrom others co-ownersindicating share of each co-owner.

2. Land is under mortgaged withBank. As per guideline theproject land should be tree troma:7 burden such as mortgage to3 party. Please submit the freshland document after clearance ofmortgage.

3. Physical status of the project, asno work should be started beforegetting IP A.

I. IPA application withoutsignature which may requestplease submit IPA applicationwith signature each and everypage.

2. Constitution is mentioned asindividual, however, applicantare 2 individuals. Please clarify.

3. As per IPA application applicantare two namely (1) SitaramKumawat (2) SangeetaKumawat, however land is inthe name of one applicant i.e.Sangeeta Kumawat.

4. Technical standard /specification In prescribedformat.

5. Physical status of the project, asno work should be started beforegetting IPA.

I. IPA application duly signed byapplicant on each and everypage

2. Self attested Pan Card/ VoterCard and Aadhard card.

3. Undertaking trom promoter/applicant in prescribed format.

4. Project land ownership in thename of applicant with clearsurvev no. and olot and entrv in

~

I.e .

standard Ion prescribed

62. Shri Ashok Kumar Ooomra,Village- 8 B.S.M., Tehsil &Oistt. Bikaner (Rajasthan)(08ARJ0006383)

North Zone(Sr. no. 37)

. .

33 I P age

RoR with latest record selfattested.

5. If, land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromRevenue Authority and NOCfrom others co-ownersindicating share of each co-owner

6. Certified copy of Encumbrancecertificate. As per guideline theproject land should be free fromany burden from 3rd partymortgage.

7. Certified copy of OPR withfinancial parameter on thesuggestive lines of NHB ModelOPR Templates duly signed byapplicant on each and everypage.

8. Applicant has attached severalbills related to work of theproject including plantingmaterial.

9. Therefore, pre-inspection maybe conducted to ascertain theprogress of project by 00 NHBJaipur.

1. IPA application duly signed byapplicant on each and everypage.

2. Land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromRevenue Authority and NOCfrom others co-ownersindicating share of each co-owner.

3. IPA application in the name ofAshok Kumar Doomra and landdocument in the name of AshokKumar. Please clarify.

4. OPR is incomplete. Pleasesubmit complete OPR on thesuggestive lines of NHB ModelDPR Templates duly signed byapplicant on each and everypage.

5. Technicalspecificationformat.

6. Please provide fresh landdocument ('

63. Shri Gori Shankar, Village-Bhagsar, Tehsil- Sitto Gunno,Distt. Fazilka (P.B)(03APBOOO1666)

64. MIs Parbati Devi, Village -Sappan wali, Tehsil- Abohar,Distt. Fazilka (P.B)(03APBOOO1668)

North Zone(Sr. no. 38)

North Zone(Sr. no. 39)

341Page

Jamaband i/Khaton ilG irdawarietc.

7. Physical status of the project, asno work should be started beforegetting IPA.

I. As per IPA application surveyno. mentioned khatoni 27,khewat 1916 however as perproject land record survey no.mentioned 1916, khewat no. 27please claritY and submit correctfresh land document.

2. Land m the name of twopersons, kindly provide HissaParman Patra (Land share) fromRevenue Authority and NOCfrom others co-ownersindicating share of each co-owner with English version.

3. Land seems to be undermortgaged with Bank. As perguideline the project land shouldbe free from any burden such asmortgage to 3rd party. Pleasesubm it the fresh land documentafter clearance of mortgage.

4. DPR is incomplete. Pleasesubmit complete DPR on thesuggestive lines of NHB ModelDPR Templates duly signed byapplicant on each and everypage.

5. Physical status of the project, asno work should be started beforegetting IPA.

1. IPA application duly signed byapplicant on each and everypage.

2. Certified copy of aadhar card,and Voter card is required.Submitted the aadhar card andVoter card is photocopy.

3. Undertaking is in old format,please provide new undertakingas per NHB prescribed format.

4. Applicant has submitted the landdocuments without signatureand photocopy.

5. Land is in the name of severalpersons, kindly provide HissaParman Patra Land share) from

~\~')-O~

65. Shri Lakhbir Singh, Village -Kingeria, Tehsil- Pathankot,Distt. Gardaspur (P.B)(03APBOOO1678)

North Zone. (Sr. no. 40)

3SlPage

'Tehsildar and NOe from othersco-owners indicating share ofeach co-owner with Englishversion.

6. The Submitted DPR is unsigned,we may advise to applicant tosubmit the signed copy ofDPR.

7. Technical standard Ispecification in prescribedformat.

8. Applicant name is Parbati Devihowever as per land documentEnglish translated copy name isParti Devi.

9. Land seems to be undermortgaged with Bank. As perguideline the project land shouldbe free from any burden such asmortgage to 3m party. Pleasesubmit the fresh land documentafter clearance of mortgage.

10. Physical status of the project, asno work should be started beforeQettinQIPA.

1. IPA application duly signed byapplicant on each and everypage.

2. The promoter has mentionedsurvey no. in IPA applicationi.e. 8R/24/2, 8R/25/2, 9R/21/1,12R/111, 13R/I0I2 & 13R,however as per land recordssurvey no is mentioned 8R/24/2,8R/25/2, 9R/2111, 12R/l/1,13R/l0I2 & HR/4/2, 13R/5/1,which may be clarified.

3. Undertaking is in old format,please provide new undertakingas per NHB prescribed format.

4. Land in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromRevenue Authority and NOefrom others co-owners,indicating share of each co-owner with English version.

5. As per DPR page no. 21, has notbeen mentioned any HI-techcomponent in the project such asdrip fogger system.

6. Land is under mortgaged withPunjab National Bank. As perQuideline the D' 'ect land should

66. Shri Munish Kumar & others2, Village- Diwankhera,Tehsil- Abohar, Distt.Fazilka(P.B)(03APB0001677)

67. Shri Amandeep Singh & other2, Village- Bahadur Khera,Tehsil- Abohar, Oistt. Fazilka(P.B), (03APBOOOI671)

North Zone(Sr. no. 41)

North Zone(Sr. no. 42)

36 I P age

be free from any burden such asmortgage to 3'd party. Pleasesubmit the fresh land documentafter clearance of mortgage.

7. Promoter has submitted detailproject report without signature.

8. Physical status of the project, asno work should be started beforeQettinQ IPA.

I . Constitution to be changed fromindividual to two individual.

2. OPR does not have financialparameters.

3. Land is under mortgaged withBank. As per guideline theproject land should be free fromany burden such as mortgage to3'd party. Please submit the freshland document after clearance ofmortgage & indicate type ofloan availed.

4. Land is in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromRevenue Authority and NOCfrom others co-ownersindicating share of each co-owner.

5. Physical status of the project, asno work should be started beforeQettinQIPA.

1. Constitution to be changed fromindividual to two individual.

2. OPR does not have financialparameters.

3. Land is under mortgaged withBank. As per guideline theproject land should be free fromany burden such as mortgage to3'd party. Please submit the freshland document after clearance ofmortgage.

4. Land in the name of severalpersons, kindly provide HissaParman Patra (Land share) fromRevenue Authority and NOCfrom others co-ownersindicating share of each co-owner.

5. Physical status of the project, asno work should be started beforegetting IPA. \

\

68. Mis Nandha Cold Storage,Village- Chak Chela, Tashpurto Malsian Road, Tehsil-Shahkot, Distt. -Jalandhar(Punjab),(03APBOCSOOOl13)

69. Mis G.K. Cold Storage,Village- Alipur, Tehsil-Khanna, Distt. Ludhiana (PB)(03APBOCSOOOI14)

(C) Rejected Projects

North Zone(Sr. no. 43)

North Zone(Sr. no. 44)

I . Please inform capacity. ofexisting cold storage.

2. Confirmation regarding whetherthe term loan is to be availedfrom the same bank that hasextended the term loan forexisting cold storage and facilityis mortgage.

3. Please provide the informationfrom concerned bank about thetype of loan whether KCC orterm loan availed by applicantagainst mortgage ofland.

4. Pre-inspection may beconducted

1. Constitution of the firm ISPartnership firm namely MisG.K. Cold Storage with twopartners namely Sh. JaspinderSingh & Sh. Itinderjit Singh.

2. Soft copy of Basic data sheetwith heat load calculation on e-mail id [email protected],[email protected]

3. Expert from empanelled list maybe nominated for TechnicalScrutiny of Basic Data Sheet.

4. Pre-inspection may beconducted.

PPAC discussed the following project proposals in the light of contents of agenda notes and schemeguidelines. PPAC decided to reject these project proposals on the groundsl reasons indicated against eachproject: -

Sr. Name of the Project and Volume and Sr. Grounds I Reasons for rejection ofNo. Project code No. of Agenda application.

Notes1 Rita Chandrawanshi East Zone It is a case of IPA design 2019-20. The

At- Village Jaroda, Tal - (Sr. No. 08) applicant was required to submit the desiredDharsiwa, Dist - Raipur (CG) documents till 30.09.2020. The applicant(22ACGOOOJ21) failed to confirm that project is credit linked

and submit the revised documents till3.1.l 0.2020 (last opportunity). Theapplicant was advised to re-submit the freshapplication as per guidelines. ~

''Y\V>-' i)-D" \1

---- .. ~- .. --

37 I P age

"

2 M/s KDS Ripening Chambers, North Zone The project was received on 21.09.2020VPO-Lassipora, Taluka-Litter, (Sr. no. 45) under,IPA Design 2020-21. As per OfficeDistt.-Pulwama (J&K) Order No. NHB//MC-84th/ATR/Officer(0IAJKOOO0813) Order/2019-20 dated 05.03.2020, the Bank

loan for the project is to be got sanctionedafter issue ofIP A. In this project, the bankloan has been sanctioned prior to IPAapplication i.e. on 09.09.2020.

Project has been received during financialyear 2020-21. However in the captionedproject loan has been already sanctioned on09.09.2020, which is not permitted as perNHB Guideline.

(D) CIosedlWithdrawn Projects

PPAC discussed the following project proposals in the light of contents of agenda notes and schemeguidelines. PPAC decided to close/withdrawn these project proposals on the grounds/reasons indicatedagainst each project: -

Sr. Name of the project and & Volume and Sr. No. of Reason for closingNo. project code Agenda Notes

I Mr. Ketan Ramesh Godase, West Zone The proposal was closed on the request ofSurvey/Gat No. 423/A/2, (Sr. No. 12) applicant as the applicant alreadyVillage - Saundane, Taluka - submitted a revised proposalMoho!, District - Solapur (27BMHB048542).(MH)- (27BMHB048205)

2 Mr. Anil Tukaram Jambhale, West Zone The proposal was closed on the request ofSurvey/Gat No. 38, Village - (Sr. No. 17) applicant as the applicant alreadyChavanwadi, Taluka - Ajara, submitted a revised proposalDistrict - Kolhapur (MH) (27BMHB048540).(27BMHB048257)

3 M/s. Balaj i Wafers Pvt. Ltd., East Zone The proposal was closed on the request ofSurvey no. 79/4/1, Halka no 2, (Sr. No. 24) applicant as the applicant alreadyVillage - Bhaislay, Tehsil - submitted a revised proposalMhow, Distt.- Indore (MP) «23AMPOCS00006 I).(23AMPOCSOOO055)

Meeting ended with a Vote of Thanks to the chair.

381Page