Filling up of the post of Senior Deputy Chief Accounts Officer ...
Bigbag filling system
-
Upload
khangminh22 -
Category
Documents
-
view
1 -
download
0
Transcript of Bigbag filling system
Bigbag filling system
User manual
Packaging division
www.arcomet7.com Tel .: +34 976 14 18 73
Bagger ENM50
Pallet dispenser
Conveyor Belt
Bagger ECF 30-700
commercial department
To request bids, extensions or sales inquiries, you should contact in the mail:
+34 976 14 18 73
aftersales
For any request for spare parts, support services, state orders, warranties etc. You should contact the
production department:
+34 976 14 49 81
+34 689 71 08 08
Warranty
Production Order M20-00157
Serial LBD-1500-0007
Start date
operator signature
DECLARATION OF CONFORMITY CE
ARCO MET 7 SL
Industrial Estate Centrovia, Calle Buenos Aires # 12, Hall A
50198 - La Muela
Zaragoza - Spain CIF B-50994631
Declares that the filling system Bigbag:
Brand: ARCO MET 7 SL
Kind: LBD-1500 System of filling Bigbag
described in the accompanying documentation, it is in accordance with
Directives 2006/42 / EC (Machinery Directive), 2014/35 / EU (Low Voltage
Directive) and 2014/30 / EU (EMC Directive).
Excluding responsibilities for parts, components, machines, systems support and other elements mounted or added by the customer.
This certificate ensures that the machine is provided with isolation elements
necessary security. the complete safety of all machines that are not certified installation.
ARCO MET 7 SL
Signed: Technical Direction
INDEX SAFETY RULES .................................................................................................................................................................... 5
LIST OF SYMBOLS AND WARNINGS ................................................................................................................................... 6
1.TECHNICAL SPECIFICATIONS .......................................................................................................................................... 7
1.1 Technical information ............................................................................................................................................. 7
1.2 Machine Description ............................................................................................................................................... 8
2.TRANSPORTATION AND STORAGE ............................................................................................................................... 11
2.1 Packaging .............................................................................................................................................................. 11
2.2 Lifting, transportation, loading and unloading ..................................................................................................... 11
2.3 Verifications during delivery and unpacking ......................................................................................................... 11
2.3.1 Delivery Check ................................................................................................................................................ 11
2.3.2 Unpacking ...................................................................................................................................................... 13
2.4 Machine installation .............................................................................................................................................. 11
3.SECURITY ...................................................................................................................................................................... 14
3.1 Description ............................................................................................................................................................ 14
3.2 Safety devices ........................................................................................................................................................ 15
4. MAINTENANCE ............................................................................................................................................................ 16
4.1 Preventive Maintenance ....................................................................................................................................... 15
5. RECOMMENDED LIST OF ELEMENTS ....................................................................................................................... 17
6. GUARANTEE ............................................................................................................................................................ 19
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 5/20
SAFETY RULES
Current regulations prevention of occupational hazards is applied at all times. Special care should be taken with the items listed below.
PERSONAL PROTECTIVE EQUIPMENT (PPE)
Both shoes, gloves and helmet will be mandatory forever. Other security elements is always mandatory use and when other installation work is necessary for operator safety.
GENERAL RULES
Security is critical to preserve the health and physical integrity, then some general measures exist:
- properly use all the individual safety equipment. - Use the tools properly and ensure they are in perfect condition. - Never remove any personal protection. - Do not use any machine or tool without knowing it. - Try not to use rings, pendants or bracelets or the like during work.
Environmentally friendly
To respect and preserve the environment is advised:
- Rational use of water and energy. - Not produce polluting emissions due to incineration or burning oils, plastics, paints, cardboard etc. - The waste wood, plastics, metals etc., will be collected at the end of the assembly, they will be deposited in
suitable containers for disposal or sent to a landfill. - Do not pour oils, solvents or paints drains or surrounding soil, they must be delivered to specific collection
sites. - Avoid provoking, as far as possible, noise and odors.
This team respects the environment
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 6/20
LIST OF SYMBOLS AND WARNINGS
ATTENTION!
1 The connection must be made exclusively by trained
technicians to complete it.
2 The electrical connection must have a grounding. Do
not use the ground wire to deflect different voltages as it
may generate noise in electronic devices.
3rd Perform maintenance of the machine thoroughly and
constant. Look maintenance section.
4th The machines must be transported carefully to avoid
damage due to poor transportation.
It is prohibited to repair, lubricate, adjust or
clean mechanical organs in motion.
It is forbidden to remove or disable protection
devices and safety.
Electric risk
generic risk
Must wear gloves and safety shoes during
installation phases, installation and
maintenance.
This equipment / machine is fragile and must
avoid stacking objects on it.
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 7/20
1. TECHNICAL SPECIFICATIONS
1.1 Technical information
Bigbag filling system has the following characteristics:
-System weighing by four load cells.
Key features
Production 20 / 30BB / hour
sack minimum dimensions 900x900x1000mm
Maximum dimensions sack 950x950x2000mm
Weight 1500 kg
Noise level 75dB
Electrical power supply
Network voltage 400 V 50/60 Hz (3 phase + Earth)
Power 0.75 kW
full load current 1,88 A
Vacuum intensity 1,56 A
air supply
Compressed air consumption 200 L / m
Pressure 7-8 bar
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 8/20
1.2 Machine Description
The filling system Bigbag comprises the following components:
Position 1: Hopper
Position 2: Decompression System
Position 3: Support System mouth
Position 4: Inflation System Bigbag
Position 5: Weighing Equipment
1
3
4
2
5
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 9/20
1.2.1 Hopper
The hopper has been designed with a capacity of 5m3. The hopper has a chopping board gate to open and
close the passage of the product when necessary.
The hopper is supplied with a medium level.
1.2.2 Support system mouth
This system allows to hold the mouth of the bag automatically, facilitating support and avoiding losses
of material. This system consists of two pneumatic cylinders that actuate a clamp which presses the mouth of the bag
against the cylinder outlet of the hopper.
1.2.3 Bigbag inflation system
It consists of a fan blowing over the mouth of hinchándolo sac to allow faster and
homogeneous filling.
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 10/20
1.2.4 Decompression system
This system consists of a valve allowing release air situated inside the bag during filling thereof.
1.2.5 Control panel and weighing equipment
It is the part of the machine that interacts with the user and allows the configuration and proper
functioning of it. AE-4210 allows allows the control of the dosage of the product. The system has a weighing platform
with 4 load cells. This platform is located at the bottom of the system.
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 11/20
TRANSPORTATION AND STORAGE
1.3 Packaging During the movement, the parts of the machine must be adequately protected to prevent damage. For this
purpose plastic protect delicate surfaces and the entire machine with shrinkable plastic be packed.
When transporting various machines, they will join with plastic seals placing cartons to protect the edges and
wooden dowels to spread the weight of the machines placed on top.
1.4 Lifting, transportation, loading and unloading
2000 Kg 2000 Kg
Teams must be transported carefully to avoid damage due to poor
transportation.
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 12/20
To move the machine to its final location, it must raise the points indicated, as shown in Fig. It will rise by slings
with a yield strength greater than 2000 kg.
By raising or displacing by the body height of the machine, the operator must prevent the passage or
permanence of people or objects under these suspended loads. It is also necessary that the machine is not deposited
on other materials or objects, it must always be perfectly deposited on horizontal and capable of supporting its weight
surfaces.
The installation of the machine bodies operating in the area must be made with special care as possible blows
can cause serious damage that jeopardize the proper duty cycle. Upon unpacking operations scrupulously observe the
following:
- After removing the packaging check carefully that no alterations or damage were observed in the components
of the machine.
- If in doubt, stop using the machine and request the assistance of qualified personnel by ARCOMET7 SL.
- During assembly of the machine it is necessary to wear gloves and safety shoes.
- Must avoid stacking objects on the body of the machine, as it is fragile.
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 13/20
1.5 Verifications during delivery and unpacking
2.3.1 Delivery Check
Inspect the packaging machine immediately when you arrive. Any damage during transport must be photographed and immediately inform ARCOMET7 via email or phone contact in a minor, following receipt within a week whether to file an insurance claim transport.
A machine that is not installed immediately when it arrives should be under supervision and with appropriate
protections.
2.3.2 Unpacking
Place the machine so as not to obstruct the manipulation of any other element and on a flat surface, free from vibration.
1.6 Machine installation
The steps for proper installation of the machine are as follows:
1. Move the machine to the workplace. 2. perfectly align the machine. 3. Connect the motor to the electrical panel.
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 14/20
3. SECURITY
3.1 Description ARCOMET7 SL all rights, actions and initiatives in order to contrast all damages that may refer you to an
improper use of this manual is reserved. It declines all liability for injury to persons or damage to objects arising from
a breach of the recommendations listed below.
THE OPERATOR MUST THE OPERATOR MUST NOT 1. Use carefully and appropriately safety devices and means of protection,
both individual and collective, made available by the company
responsible.
2. scrupulously respect the manufacturer's instructions, manufacturer
company, of the owner, the manager and other staff responsible for
collective and individual protection.
3. adequate lighting to facilitate local control operations.
4. Use cables appropriate section for the power of the machine installed
in your outlet. This must be protected against high temperatures and
surfaces or edges that could cut. Cable RV-K 0.6 / 1 kV is recommended.
5. Perform replacement cord in the presence of wear or damage.
6. Report immediately to the company owner, the manager and staff
responsible for the safety of the anomalies that can detect security
devices, as well as any other possible dangerous situation that can verify
staff.
7. You should check the correct operation of all safety devices before each
shift.
8. Keep with care and easily accessible the manual.
9. Maintain order in the workplace. The pavement should remain dry,
aceito or grease stains.
1. Change without prior authorization safety devices, measuring
or signaling or protection devices.
2. Run your own initiative operations, repairs or maneuvers that
are not within its competence which may compromise health
or own or others safety.
3. Leave tools on or near the machine.
4. Introduce foreign bodies under the covers of electrical or
between moving parts of the machine motors.
5. Open safety devices during operation of the machine.
6. Use gateways or temporary structures to climb over the
machine.
7. Oil, clean or regulating mechanisms during operation.
8. Power supply to the machine making unauthorized main
switch or safety devices alterations.
9. Working unsteady. You must constantly keep a safe position
on the machine and in proper balance.
10. Wear inappropriate clothing. The operator should not carry
too broad nor loose parts or parts that can be trapped.
11. Use belts, rings or chains.
12. Power supply to the machine while maintenance work,
routine, scheduled and extraordinary are made. There will be
suspended by the general voltage power switch.
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 15/20
3.2 Safety devices
When electrical equipment is carried out electronically Arco, they will be carried out under security measures
that comply with the rules, whereas, if they come from an outside company to Arco, should be required and will be
the responsibility of that company compliance safety regulations, Arco being exempt from any liability.
SAFETY DEVICES
Electric protections
(Installer electrical box / rush)
a) The appliance should be connected to ground. Check that the
voltage matches indicated on the plate.
b) Extension cables must be approved for outdoor use with plug
connections.
c) Never touch the pins of the plug with wet hands.
d) For devices with explosion protection regulations must be
observed protective effect on the site.
e) Electrical repairs can only be performed by electricians. For
repairs, respect IP 55 protection class.
mechanical protection
a) Protection of moving parts and moving parts.
b) All mechanical components with moving parts are protected
by guards.
c) Any alteration of maintenance required withdrawal must
follow the same safety procedures contained in this manual.
d) These elements are necessary for maintenance, all are
constructed to meet present needs.
Attention! When operating the equipment, all facilities security and protection, such as
removable safety devices, emergency switches, etc. They must be present and functional.
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 16/20
4. MAINTENANCE
4.1 Preventive Maintenance
Periodicity Element Description Position
daily Mobile parts Clean product incrustations 1
Monthly pneumatic cylinders
Review Status 2
Gate closing the scale 3
Maintenance of the electrical panel will be indicated by the manufacturer.
2
n
e
1
w
o
3
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 17/20
5. RECOMMENDED LIST OF ELEMENTS
5.1 weighing hopper
5.2 Decompression System
CODE ofhis POSITION
MT025402 TEXTIL FILTER 1
MET73910622 VALVE 2
CODE ofhis POSITION
MT031500 Dosapro VALVE DN50 1
1
w
o
2
1
n
e
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 18/20
System 5.3 inflated Bigbag
5.4 Support System mouth
Note: You will receive annually ofhis installation, with the list of recommended spare parts and valued.
CODE ofhis POSITION
MT400310 CMA-528 FAN 1
CODE ofhis POSITION
CDQ2B50TF-100DMZ COMPACT CYLINDER ø50 C100 1
MT041601 BEARING BRONZE autolubricado 2
MT041632 BRONZE BEARING Flanged autolubricado BB1412DU 3
SY7120-BDZ-02F-Q SOLENOID 5/2 MONOEST. ¼ "24 VAC. 4
1
n
e
1
n
e
2
w
o 3
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 19/20
6. GUARANTEE
These are the general conditions of sale for equipment ARCO MET 7:
a) ARCO MET 7 SL products are guaranteed for 12 months from the date of manufacture
against defects in component quality, manufacturing and / or assembly.
b) Warranty you never are considered faults or defects caused by tampering, breakage by
blows or the like, as well as external agents such as excessive equipment surge,
excessive moisture, etc.
c) ARCO MET 7 SL is not responsible for any incidents or damage caused by the machines
installed.
d) The concept of security includes:
- Replacement and / or repair of parts and components.
- Labor required for such repair.
- Service instruction book and schemes.
e) The concept of warranty does not include:
- Transport costs of parts or defective parts.
- Travel expenses for repair.
- Subsistence allowance during repair.
USER MANUAL FILLING SYSTEM BIGBAG
Polígono Industrial Centrovía - C \ Buenos Aires # 12 - CP: 50198 - The Grind ZARAGOZA (SPAIN) TEL: +34 976 14 18 73 FAX: +34 976 14 47 63 www.arcomet7.com E-mail: [email protected] Page: 20/20