annual report 2020 - National Housing Authority

84
NATIONAL HOUSING AUTHORITY annual report

Transcript of annual report 2020 - National Housing Authority

NATIONAL HOUSING AUTHORITY

a n n u a lr e p o r t

CONTENTS TABLE OF

02 President Rodrigo Roa Duterte03 Sec. Eduardo D. Del Rosario, DHSUD05 General Manager Marcelino P. Escalada, Jr.

01 Messages

64 Help is Just Around the Corner

63 Special Report

65 Board of Directors

12 Performance Report

25 2020 Financial Highlights

31 Projects Implemented

08 AgencyClassificationandMandates09 2019 Strategy Map10 Housing Programs 11 Delivery Schemes 11 Governing Board

07 Corporate Profile

70 Key Officials

MM E S S A G E S

2NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

RODRIGO ROA DUTERTE

Message of the President

Owning safe, decent and affordable housing is every Filipino’s dream. But the housing market remains inaccessible to most of our countrymen.

I renew my call for Congress to pass the National Housing Development bill and the Rental Housing Subsidy bill. These will enable all Filipinos—regardless of social status—to live in decent homes where their families can lead meaningful lives.

PRESIDENT

President Rodrigo Roa Duterte

NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020 MessagesMessages

Excerpt from President Rodrigo Roa Duterte’s 5th State of the Nation Address, July 27, 2020

3 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Greetings of peace!

The past year has been eventful – from the Taal Volcano eruption, Masbate earthquake, floods and landslides brought about by various typhoons, to the infamous and still ongoing COVID-19 pandemic which makes recovery extra hard for calamity-stricken communities.

Nonetheless, the NHA remained steadfast in its commitment of providing “comprehensive and well-planned human settlement for the homeless, marginalized, and low-income

families, thereby improving their quality of life.”

EDUARDO D. DEL ROSARIODHSUD SECRETARY

4NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

I sincerely commend the men and women of the NHA for stepping up to the challenges of the “new normal” as they stand committed to transparency, accountability, teamwork and responsiveness.

We take pride in its modest gains in accomplishing its Key Result Areas for 2020 despite the limited human resource, mobility and finances.

Moreover, the NHA has fulfilled its role in the Marawi rehabilitation as it is ahead of its set targets for debris management, completion of road infrastructures and construction of and land development for temporary shelters.

These reflect the NHA’s unwavering dedication to its mandate, especially the need of every Filipino family to have a shelter of their own to shield them from the virus and various elements has become paramount.

As the nation continues to heal as one, the Department of Human Settlements and Urban Development remains one with you in attaining our vision of Building Adequate, Livable, Affordable and Inclusive (BALAI) Filipino communities.

The dream of our kababayans to have decent and affordable shelters they can call their own is a right of every Filipino family and it is our responsibility that it be realized.

Again, my sincerest congratulations to the NHA for a successful 2020.

Mabuhay tayong lahat!

Secretary Eduardo D. Del Rosario

Messages

5 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

GENERAL MANAGER

The COVID-19 pandemic has made 2020 a year filled with uncertainties, but such uncertainties bring out solidarity among our people. Indeed, this is what we should be doing in order to get through these challenges. As workers of government, we must make sure that we do our part in keeping one another safe from the harms brought about by the virus by

following our health and safety protocols such washing our hands and observing

social distancing.

The NHA has done its part in helping to contain the spread of

COVID-19 by effecting these measures and putting those standards into practice in order to ensure the health and safety of all our officials and employees through constant temperature

MARCELINO P. ESCALADA, JRNHA GENERAL MANAGER

6NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

checks, weekly workplace sanitations, and alternative work arrangements.

To aid our beneficiaries, we have issued a moratorium on the payment of their housing monthly amortizations covering the periods between March 16 to June 15, 2020, as well as between November 1 to December 31, 2020. This is our contribution to the present administration’s “Bayanihan to Heal as One” initiative.

Even in times like this, I am still sure of the things that I should be proud of and grateful for. Allow me to thank all of our managers and all of their respective staff for their immense dedication in fulfilling their duties to the Authority despite the pandemic. The COVID-19 crisis has dampened our spirits in certain ways, but we must keep moving forward.

We should remain strong and steadfast amid all of the problems that we face. Once this is all over, we shall remain determined in providing the basic services that are expected of us- providing quality housing and basic facilities for our fellow Filipino people.

Lastly, I appeal to everyone to focus, remain calm, stay safe, and stay at home.

To my NHA Family, my sincerest gratitude for your dedication and hard work.

Mabuhay Kayong Lahat!

General Manager Marcelino P. Escalada, Jr.

Messages

7 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

cPc o r p o r a t e

p r o f i l e

Corporate Profile

8NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

MANDATES

CHARTER

• Under PD 757 dated 31 July 1975, NHA was tasked to develop and implement a comprehensive and integrated housing program which shall embrace, among others, housing development and resettlement, sources and schemes of financing, and delineation of government and private sector participation.

• Under EO 90 dated 17 December 1986, NHA was mandated as the sole national government agency to engage in shelter production focusing on the housing needs of the lowest 30% of the urban population.

• Under RA 7279 (UDHA) dated 24 March 1992, NHA was tasked to provide technical and other forms of assistance to local government units (LGUs) in the implementation of their housing programs; to undertake identification, acquisition and disposition of lands for socialized housing; and to undertake relocation and resettlement of families with local government units.

• Under RA 7835 (CISFA) dated 08 December 1994, NHA was tasked with the implementation of the following components of the National Shelter Program - the Resettlement Program, Medium Rise Public and Private Housing, Cost Recoverable Programs and the Local Housing Program.

• Under EO 195 dated 31 December 1999, NHA was mandated to focus on socialized housing through the development and implementation of a comprehensive and integrated housing development and resettlement; fast tracking the determination and development of government lands suitable for housing; and ensuring the sustainability of socialized housing funds by improving its collection efficiency, among others.

AGENCYCLASSIFICATIONGovernment-owned and controlled corporation under the administrative supervision of the Department of Human Settlement and Human Development and classified under the Infrastructure Utilities Group.

Presidential Decree No. 757 dated 31 July 1975P

Corporate Profile

9 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020 Corporate Profile

CHARTER STATEMENT &STRATEGY MAP

VISION1/ : A viable organization that leads in the provision of comprehensive and well-planned human settlements for the homeless, marginalized, and low-income families, thereby improving their quality of life

MISSION1/ : By 2025, NHA shall have addressed 23%2/ of the housing need ofhomeless, marginalized,and low-income families,by building affordable,livable, adequate, andinclusive communitieswith basic services andsocio-economicopportunities

CORE VALUES1/ :

• Transparency• Responsiveness• Accountability• Integrity• Teamwork• Excellence

ST

AK

EH

OL

DE

RS

/S

OC

IAL

IM

PA

CT

FIN

AN

CIA

LIN

TE

RN

AL

p

RO

CE

SS

ES

LE

AR

NIN

G &

GR

OW

TH

STGRATEGIC THEMES:

Scale-up Provision of Safe and Affordable Housing Responsive

to the Needs of ISFs and Low-Income Formal Sector

Strengthen Strategic Partnerships with Stakeholders

Improve StakeholderSatisfaction

Efficient BudgetManagement

Efficient AssetManagement

Optimum Utilization ofInformation and Communication

Technology

Established QualityManagement System

Established Competency-BasedFramework

Improved Organization andManagement (New)

Innovative Design andTechnology for Human

Settlements

Operational Excellence andResearch Mobilization

Competent, Committed andSynergic Workforce

1/ As agreed upon during the NHA Strategic Planning held March 28-29, 2019 at Clark, Pampanga2/ Based on NHA’s target of 428,121 housing units for 2020 to 2025 under the Proposed National Housing Development Production and Financing Act (NHDPFA):Total housing need as of 2017: 1,898,993 housing units

10NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

RESETTLEMENT PROGRAMA. For Informal Settler Families Affected by the Supreme Court’s Mandamus to clean-up the Manila Bay Area, Government Infrastructure Projects and Those Living along Danger Areas

• Addresses the requirements of families affected by government infrastructure project and those living along danger areas• Entails the provision of housing units, community facilities, socio-economic and other community support programs

B. Regional Resettlement• Involves the implementation of local regional resettlement projects as joint National Government and Local Government undertakings• Addresses the resettlement requirements of Local Government Units (LGUs) outside Metro Manila involving families living along danger areas, those affected by government infrastructure projects, Indigenous Peoples and former rebels

• Intended to address security of tenure and infrastructure requirements of informal settlements on government-owned lands procla imed or designated as socialized housing sites• Covers survey ad titling of individuals lots for disposition to q u a l i f i e d o cc u p a n t s , infrastructure development, housing construction and rehabi l i tat ion of exist ing project sites

• Involves the development of low-rise (up to 5 storeys) and medium-rise (up to 15 storeys) residential buildings in government -owned properties for low-income families

• The program is intended to provide decent and affordable housing to low-salaried government employees including members of the Armed Forces of the Philippines (AFP), Philippines National Police (PNP), Bureau of Jail Management and Penology (BJMP), Bureau of Fire Protection (BFP), and Bureau of Corrections (BuCor) and other qualified government employees

• The program is intended to respond to the housing need of low and marginal-income and/or informal settler families for permanent shelter affected by calamities such as typhoons, landslides, earthquakes, and fires for relocation to safe areas

SETTLEMENTS UPGRADING PROGRAM

VERTICAL DEVELOPMENT

GOVERNMENT EMPLOYEES HOUSING PROGRAM

HOUSING PROGRAM FOR CALAMITY VICTIMS

HOUSINGPROGRAMS

Corporate Profile

11 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Delivery Schemes

Direct Delivery

NHA undertakes housing development on its own through the award of civil works contracts. Project planning, financing, implementation/contract supervision, and disposition of housing units are undertaken directly under its Community-Initiative Approach Program (CIAP).

The CIAP is an implementation strategy designed to build on the initiative and promote the participation of affected families, through their Community Associations, in the housing development decision-making process particularly in the choice of housing sites and to allow them to acquire housing units in their selected sites.

Joint Venture

A strategy based on resource/expertise-sharing scheme with private landowners, private developers, local government units, civil society organizations (CSOs) with equity contribution taking the form of land or funds for development.

Technical Assistance

The NHA provides to its housing development partners the technical support and services in various aspects of project development to ensure proper planning as well as efficient implementation, operation, and management of the housing projects.

GOVERNING BOARDChairman: Chairman, Housing and Urban Development Coordinating CouncilMembers: The Executive Secretary - Office of the President General Manager - National Housing Authority Director-General - National Economic and Development Authority Secretary - Department of Public Works and Highways Secretary - Department of Finance Secretary - Department of Labor and Employment Secretary - Department of Trade and Industry

Manpower Complement as of December 2020 : 3,193 Employees

Authorized Capitalization PD 757 (1975) : Php500 Million PD 1430 (1978) : Increased to Php2 Billion PD 1924 (1984) : Increased to Php5 Billion

Financial Condition as of December 31, 2019: Total Assets - P165.868 Billion Total Liability - P23.896 Billion Equity - P141.972 Billion

PCorporate Profile

12NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PRp e r f o r m a n c e

r e p o r t

Performance Report

13 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Source: Corporate Planning Department- Monitoring and Evaluation Division

For 2020 Key Result Areas (KRAs), NHA accomplished 124% in Housing Starts (67,785 units out of 54,777 target units), 96% in Housing Completions (46,605 units out of 48,480 target units), 74% in Sales and Disposition (12,152 units out of 16,410 target units), and 98% in Collection (P1,663 Million out of the P1,695 Million target).

A. 2020 BOARD APPROVED WORK PROGRAM

Due to the COVID-19 pandemic which led to community quarantines that limited mobility of manpower and resources, the Work Program targets were recalibrated last May and September 2020. This recalibration resulted in a significant decrease of -51% in Housing Completions targets, an average of -36% in Sales and Disposition targets, and -40% in Collection targets.

Table 1: 2020 Board Approved Work Program Targets

Key Result Area (KRA)

Board Approved Targets % of Increase

(Decrease)(d=[c/a]-1)

Original(a)

Recalibrated (May 2020)

(b)

Recalibrated(Sept. 2020)

(c)

Housing Production/Assistance

Housing Starts 56,942 51,543 54,777 -4%

Housing Completions 99,510 68,095 48,480 -51%

New Works 21,177 11,957 9,075 -57%

Carry Over Works 78,333 56,137 39,405 -50%

Sales and Disposition

Units 25,983 16,410 -37%

Sales Value (P’M) 4,815 3,133 -35%

Collection (P’M) 2,818 1,695 -40%

2020PERFORMANCEREPORT

Performance Report

14NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

B. SUMMARY OF CORPORATE PERFORMANCE VS. 2019

The 2020 performance in Housing Starts and Housing Completions significantly increased vs 2019 by 114% and 115%, respectively.

EHAP, which contributed to 32% in Starts grew by 126% and 42% share in Completions increased by 108%. Without EHAP, production still posted a positive growth vs 2019 by 96% in Starts and 51% in Completions.

However, the effects of the COVID-19 pandemic last year resulted in a decline by -19% in terms of disposed units and -12% in sales value for Sales and Disposition; and a decrease by -3% in Collection.

Table 2: Summary of 2020 Performance vs. 2019

Figure 1: Comparative Performance vs. 2019

C. HOUSING PRODUCTION/ASSISTANCE

There were 67,785 units in Housing Starts and 46,605 units in Housing Completions accomplished in 2020. These included housing units and financial assistance from EHAP, contributing 32% from Housing Starts and 42% from Housing Completions.

Performance Report

Key Result Area (KRA)

2019 2020 % of Performance

Inc. (Dec.)(g=[f/c]-1]

Target(a)

Accomp.(b)

% to Target(c=b/a)

Target(d)

Accomp.(e)

% to Target(f=e/d)

Housing Production/Assistance

Housing Starts 64,738 37,375 58 54,777 67,785 124 114%

Housing Units 64,738 27,825 43 54,777 46,233 84 96%

EHAP 9,550 21,552

Housing Completions 117,316 52,442 45 48,480 46,605 96 115%

Housing Units 117,316 42,946 37 48,480 26,865 55 51%

EHAP 9,496 19,740

Sales and Disposition

Units 36,261 33,130 91 16,410 12,152 74 -19%

Sales Value (P’M) 6,369 6,108 96 3,133 2,648 85 -12%

Collection (P’M) 2,708 2,742 101 1,695 1,663 98 -3%

15 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

C1. HOUSING STARTS BY PROGRAM

The total Housing Starts exceeded the recalibrated target by 124%. The total accomplishment consists of 68% share from housing units (46,233 units) and 32% from EHAP (21,552 units).

Accomplishment in housing programs with large targets is important for NHA to have a strong performance in Housing Starts. Programs with large targets include Typhoon Yolanda, AFP/PNP Housing Program, Resettlement Program for ISFs Affected by the Supreme Court’s Mandamus to Clean-up the Manila Bay Area, and Resettlement Assistance to LGUs (RAPLGU).

Despite not achieving strong performance in the aforementioned programs, the Resettlement Program, in general, was able to achieve its target by 104%. This was mainly driven by the 361% attainment under Resettlement Program for ISFs Affected by Infrastructure Projects which generated 12,580 units against the target of 3,480 units. The accomplishment mostly consisted of projects in Region 4 (Cavite and Rizal) and NCR.

Program

Recallibrated Target

(Sept. 2020) (1)

Accomp.(2)

% to Target(3=2/1)

Total 54,777 67,785 124

Total Housing Units 54,777 46,233 84

Regular Production 35,893 28,761 80

Resettlement Program 20,261 21,113 104

- For ISFs Living Along Danger Areas 612 216 35 - For ISFs Affected by the Supreme Court’s Mandamus to Clean-up the Manila Bay Area

6,057 2,290 38

- For ISFs Affected by Infrastructure Projects

3,480 12,580 361

- Regional Resettlement 10,112 6,027 60 • NHA Administered/Implemented 732 - 0

• Resettlement Assistance to LGUs (RAPLGU)

5,269 3,594 68

• Indigenous Peoples 4,111 2,433 59

Settlements Upgrading 966 966 100

Sites and Services 56 - 0

Government Employees Housing Program 11,697 6,682 57

- AFP/PNP Housing Program 11,097 6,682 60

- Other GEHP 600 - 0 Mixed-Use Development 2,913 0

Housing Program for Calamity Victims 18,884 17,472 93

Permanent Housing 18,884 17,472 93

- Typhoon Yolanda 12,560 7,930 63 - Typhoon Pablo 19 19 100 - Typhoon Nina 1,036 1,036 100

Table 3: 2020 Housing Starts by Program

Performance Report

16NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

The COVID-19 pandemic has brought difficulties in identifying suitable sites for some AFP/PNP Housing projects, delays in compliance of developers and LGUs with documentary requirements, and delays in project packaging (preparation of plans, cost estimates, other documentary requirements needed for the project proposal).

C2. HOUSING COMPLETIONS

The total Housing Completions reached 96% of its recalibrated target. The total accomplishment consists of 58% housing units (26,865 units) and 42% EHAP (19,740 units).

Programs with large targets include Typhoon Yolanda, Resettlement Program for ISFs Affected by the Supreme Court’s Mandamus to Clean-up the Manila Bay Area, and RAPLGU.

Program

Recallibrated Target

(Sept. 2020) (1)

Accomp.(2)

% to Target(3=2/1)

- Typhoon Usman 2,826 2,593 92 - Naqa Landslide 192 192 100-ZamboangaConflict 111 - 0 - Mindanao Earthquake 2,002 3,702 185 - Fire Victims 138 - 0-MarawiConflict - 2,000 no targetEmergency Housing Assistance Program - 21,552 no target

Table 4: 2020 Housing Completions by Program

Program

Recallibrated Target

(Sept. 2020) (1)

Accomp.(2)

% to Target(3=2/1)

Total 48,480 46,605 96

Total Housing Units 48,480 26,865 55

Regular Production 18,428 15,131 82

Resettlement Program 16,215 12,955 80

- For ISFs Living Along Danger Areas 917 1,167 127 - For ISFs Affected by the Supreme Court’s Mandamus to Clean-up the Manila Bay Area

7,894 7,191 91

- For ISFs Affected by Infrastructure Projects

351 409 117

- Regional Resettlement 7,053 4,188 59• NHA Administered/Implemented 444 - 0• Resettlement Assistance to LGUs (RAPLGU)

5,247 3,375 64

• Indigenous Peoples 1,040 552 53• Former Rebels 322 261 81

Performance Report

17 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Program

Recallibrated Target

(Sept. 2020) (1)

Accomp.(2)

% to Target(3=2/1)

Settlements Upgrading 488 997 204

Sites and Services 56 - 0

Government Employees Housing Program 1,669 1,179 71

- AFP/PNP Housing Program 1,669 1,179 71

Housing Program for Calamity Victims 30,052 11,734 39

Permanent Housing 30,052 10,591 35

- Typhoon Yolanda 28,694 10,151 63 - Typhoon Sendong 403 - 0 - Typhoon Nina 232 - 0 - Naga Landslide 100 - 0 - Mindanao Earthquake 623 - 0 - 6.5 Magnitude Earthquake in Leyte - 415 no target -MarawiConflict - 25 no target Transitory Shelter - 1,143 no target

-MarawiConflict - 1,143 no targetEmergency Housing Assistance Program - 19,740 no target

Despite only achieving only 35% of the target for Typhoon Yolanda, 80% performance in Resettlement Programs and EHAP helped increased the accomplishment.

Like Housing Starts, a significant challenge in accomplishment of targets is the COVID-19 pandemic. Other challenges include issues related to site condition and delays in implementation of both developers and LGUs. As a response to these challenges, NHA has continuously exerted efforts in the timely documentation of Suspension Orders and Time Extension, immediate processing of Variation Orders for additional works to suit actual site conditions, and immediate documentation of Contract Termination for projects with unjustified slippage.

D. SALES AND DISPOSITION

There were a total of 12,152 lots/housing units disposed in 2020 which generated a sales value of P2,648.249 Million.

The majority of the units disposed were Residential totaling 12,079, while only 73 units came from the sale or lease of Commercial/ Industrial/ Institutional (CII) properties. In terms of performance, 2020 sales value achieved 85% against its recalibrated target as compared to 2019 attainment of 96%. Units disposed were 74% of the recalibrated target as compared to 91% in 2019.

Resettlement Program has the highest number of accounts with a 56% share of total sales from residential units. The bulk of sales of residential units which amounted toP1,078.577 Million was mainly due to the 4,400 units under the Resettlement Program

Performance Report

18NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

for ISFs Living Along Danger Areas in Metro Manila. Moreover, the disposition of residential units under the AFP/PNP Housing Program has exceeded its target by 113%.

While the disposition of Commercial/ Industrial/ Institutional units only achieved 38% from its target, the sales of these units exceeded its target by 122%.

The decline in sales and disposition performance in 2020 was attributed to the restrictions imposed during the COVID-19 pandemic of which 54% of those units were impacted.

Table 5: 2020 Sales and Disposition by Program

Program

Recallibrated Target(Sept. 2020)

Accomplishment % to Target

Units(3)

Sales Value(In P’M)

(4)

Units(5)

Sales Value(In P’M)

(6)

Units(9=5/3)

Sales Value

(10=6/4)

Total 16,410 3,133.127 12,152 2,648.249 74 85

Residential 16,220 2,925.380 12,079 2,394.02 74 82

Resettlement 8,193 1,819.169 6,013 1,343.528 73 74

- For ISFs Living Along Danger Areas in Metro Manila

5,465 1,444.094 4,400 1,078.577 81 75

- For ISFs Affected by Infrastructure Projects in Metro Manila and Those Living Along Danger Areas Nearby Provinces

707 152.540 441 95.685 62 63

- Regular Resettlement Projects

1,971 222.535 1,087 169.266 55 76

- Resettlement Program for Former Rebels

50 85 170

AFP/PNP/BJMP/BFP Housing Program

1,222 459.349 1,384 583.527 113 127

Settlements Upgrading 2,093 243.047 927 124.866 44 51

Sites and Services 1,426 101.566 1,346 89.860 94 88

MRB/Condo/BLISS Tenament 49 12.599 66 25.898 135 206

Turned-Over Projects 3,083 254.303 2,343 226.342 76 89

Core Housing 154 35.347 0 0

Commercial/Industiral/Institutional

190 207.747 73 254.228 38 122

Commercial 171 134.241 67 248.180 39 185

Institutional 14 9.530 6 6.048 43 63

Industrial 1 51.485 0 0

Acquired (Foreclosed) 1 0.530 0 0

Mixed-Use 3 11.961 0 0

Performance Report

19 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Figure 2: Contribution of Resettlement Program to Sales – Residential Accounts

E. COLLECTION

In cognizance of the plight of the beneficiaries and as well as the NHA collection staff who were hindered by the imposed restrictions on mobility brought about by the COVID-19 pandemic, the NHA has implemented a moratorium on amortization for the period March 16 to June 30, 2020. This has resulted in a recalibration of the collection target in September 2020 from P2,818 Million to P1,695 Million or a decrease of approximately -40% from the original target.

Another round of moratorium on amortization was implemented by NHA from November 1 to December 31, 2020, which was not factored in the recalibrated target.

With this, the total amount collected in 2020 was P1,663.481 Million, or a collection achievement of 98% from its recalibrated target as compared to 101% attainment in 2019. In terms of collection distribution, 52% or P863.658 Million were from Residential Accounts and 48% or P799.823 Million were from CII Accounts.

Moreover, collection efficiency, which is a programmed collection (targeted to be collected in 2020) versus Total Amount Due (TAD), is only at 32%. Despite 75% efficiency from CII Accounts, only 20% efficiency from Residential accounts was attained.

Efforts to increase collection from Residential Accounts included collection outsourcing, fast-tracked hiring of additional collection personnel, and the development of a Billing and Collection System (BCS).

The BCS will provide for real-time updating and visibility of payment records and automatic notifications of balances. It will also encourage online payments for convenience. Lastly, its data banking capacity will improve collection analysis and help generate more evidence-based collection strategies.

Performance Report

20NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Table 6: 2020 Collection by Type of Account (in P Million)

Type of AccountTAD CY

2020(1)

Recallibrated Target

(Sept. 2020)(2)

Accomplishment % of Efficiency (6=4/12)

% to Target

(7=3/2)Total(3=4+5)

Programmed(4)

Unprogrammed(5)

Total 4,584.170 1,695.492 1,663.481 1,473.534 189.947 32 98

Residential 3,566.269 677.591 863.658 710.686 152.972 20 127

ICR/Lease 1,560.372 315.256 475.682 399.328 76.354 26 151

Loans 1,179.484 203.872 200.637 166.205 34.432 14 98

Trust Accounts 826.413 158.463 187.339 145.153 42.186 18 118

Commercial/Industrial/Institutional

1,017.901 1,017.901 799.823 762.848 36.975 75 79

F. BUDGET PERFORMANCE

F1. Funds Raised (P Billion)

Total Funds Raised. The Total Funds Raised for the period January to December 2020 amounted to P79.596 Billion, consisting of a Beginning Balance of P67.268 Billion and New Funds of P12.328 Billion. The Total Funds Raised accounted for is 107% of the Total DBM-approved Budget of P74.074 Billion.

Table 7: Funds Raised by Source

Source Budget Funds Raised% To

Budget Total Accomp

Total 74.074 79.596 107% 100%

BEGINNING BALANCES 66.550 67.268 101% 85%

Carry-Over Obligations 31.854 31.849 100% 40% Fund Balance 34.696 35.418 102% 44%New Funds 7.524 12.328 164% 15%

NG Support 3.030 3.030 100% 4%

2020 3.030 3.030 100% 4%

Emergency Housing Assistance Program 0.753 0.753 100% 1%

SC’s Mandamus to Clean-up the Manila Bay Area

1.277 1.277 100% 2%

AFP/PNP Housing Program 1.000 1.000 100% 1%

Others 3.263 5.566 0% 0%

Typhoon Usman 1.352 1.352 0% 2%

MarawiConflict 1.911 4.214 0% 5%

Corporate & Other Receipts 1.231 2.155 175% 3%

Collection from ICR/Lease Rental 0.469 1.233 263% 2%

Other Receipts 0.355 0.355 100% 0%

Other Sources 0.407 0.567 139% 1%

TRUST FUNDS (inclusive of interests earned) 1.577 2%

Performance Report

21 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

NG Support. The DBM issued Special Allotment Release Order (SARO) in 2020 amounting to P8.596 Billion, broken down per sources of funds:

Under GAA (P3.030 Billion):• Emergency Housing Assistance Program (P0.753 Billion)• Resettlement for ISFs affected by the Supreme Court’s Mandamus to Clean-up

the Manila Bay Area (P1.276 Billion)• AFP/PNP Housing Project (P1.000 Billion)

Others (P5.566 Billion):• Site development and core housing for the families affected by Typhoon Usman

(P1.352 Billion)• Housing and road infrastructure projects in Marawi (P4.214 Billion)

To date, only the P2.655 Billion under the other sources of funds was issued Notice of Cash Allocation (NCA) by DBM, which is 31% of the total SARO in 2020.

In 2020 also, NCAs amounting to P15.485 Billion were released for SAROs issued in 2013 to 2019 intended for various housing programs of NHA.

The total unissued NCA as of the end of 2020 is P50.965 Billion.

Corporate and Other Receipts. The P2.155 Billion raised by NHA represents 175% of the Total DBM-approved Budget of P1.231 Billion.

F1. Funds Utilization (P Billion)

Source Funds RaisedFunds

Obligated% VS

Raised Obligated

Total 79.596 60.733 76% 100%

Beginning Balances 67.268 52.634 78% 87%

Carry-over Obligations 31.849 31.849 100% 52% Fund Balance 35.418 20.785 59% 34%New Funds 12.328 8.099 66% 13%

NG Support 3.030 2.265 75% 4%

Emergency Housing Assistance Program

0.753 0.564 75% 1%

SC’s Mandamus to Clean-up the Manila Bay Area

1.277 1.266 99% 2%

AFP/PNP Housing Program 1.000 0.435 43% 1% Others 5.566 4.977 89% 8%

Typhoon Usman 1.352 1.167 86% 2% MarawiConflict 4.214 3.810 90% 6% Corporate & Other Receipts 2.155 0.705 33% 1%

Collection from ICR/Lease Rental

1.450 0.705 49% 1%

Other Receipts 0.705 - 0% 0% TRUST FUNDS (inclusive of interests earned)

1.577 0.152 0% 0%

Table 8: Funds Utilized by Source

Performance Report

22NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

The Total Funds Obligated of P60.733 Billion accounted for is 76% of the Funds Raised (P79.596 Billion). It consisted of 78% Beginning Balance (P52.634 Billion).

Table 9: Funds Utilized by Use

Type of Expenditure BudgetFunds Raised

Funds Obligated

Fund Balance

Obligation VS

BudgetFundsRaised

Funds Obligated

Total 80.172 79.596 60.733 18.863 76% 76% 100%

Capital Outlay 76.124 75.679 58.376 17.303 77% 77% 96%

Project Development

63.196

63.196

49.720

13.47679% 79% 82%

Resettlement

3.060

3.060

2.386

0.67478% 78% 4%

ISFs In MM and Nearby

Provinces Affected by

Infrastructure Projects

and Residing in Danger

Areas

5.615 5.615 5.570 0.045 99% 99% 99%

Emergency Hsg Assistance

Program For Calamity

Victims

35.518 35.518 24.987 10.532 70% 70% 70%

ISFs Living Along Danger

Areas in Nearby Provinces0.011 0.011 0.011 - 100% 100% 0%

DoTr- (North- South

Commuter Railway)0.261 0.261 0.006 0.255 2% 2%

MM Subway Project Phase 1 0.004 0.004 0.002 0.002 54% 54%

MRT 7 0.171 0.171 0.002 0.169 1% 1%

ISFs Affected by the PNR-

South Long Haul Project0.010 0.010 - 0.010 0% 0%

ISFs Affected by the

Supreme Court’s Mandamus

to Clear the Manila Bay

6.967 6.967 6.787 0.180 97% 97% 11%

Housing Program for ISFs

Living Along Danger Areas

in Metro Manila

4.029 4.029 3.307 0.721 82% 82% 5%

Settlements Upgrading 0.066 0.066 0.055 0.011 83% 83% 0%

Various Dpwh Funds 0.329 0.329 0.057 0.272 17% 17% 0%

AFP/PNP/BFP/BJMP Hsg.

Prog.*7.156 7.156 6.551 0.605 92% 92% 11%

Housing Support 3.280 3.280 1.573 1.707 48% 48% 3%

Land Acquisition 0.886 0.886 0.520 0.366 59% 59% 1%

Other Project-Related

Capital Outlay7.572 7.572 6.096 1.476 81% 81% 10%

Other Capital Outlay 1.189 0.744 0.467 0.277 39% 63% 1%

COE 4.048 3.917 2.357 1.559 58% 60% 4%

Performance Report

23 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Funds Obligated were for the following: Capital Outlay (P58.376 Billion, 96%) and COE (P2.357 Billion, 4%).

Of the Total Capital Outlay Obligations of P58.376 Billion, P49.720 Billion or 82% of the Total Funds Obligated is for Project Development broken down into:

As of 31 December 2020, NHA’s COE Actual Obligations reached P2.357 Billion broken down as follows:

PS Current Requirements amounting to P1.260 Billion and Carry Over Obligations pegged at P0.095 Billion for a total of P1.356 Billion.

Salaries and Wages cover the highest expense (under PS) amounting toP0.486 Billion or 53.46%, followed by Terminal Leave at P0.098 Billion or 7.26% and Life and Retirement Insurance Contribution at P0.082 Billion or 6.04%.

While NHA’S MOOE Budget Utilization is as follows:

Carry Over Obligations at P0.223 Billion and Current Requirements amounting to P0.779 Billion for a total of P1.002 Billion.

The top three (3) expenses as of 31 December 2020 were: Professional Services with the highest slice of the pie amounting to P0.511 Billion or 51.05%, followed by Other Maintenance and Operating Expense atP0.089 Billion or 8.93% and Supplies and Materials Expenses at P0.053 Billion or 5.31%.

East Sector P 0.838 1%

West Sector 0.003 0%

North Sector 3.329 5%

South Sector 0.019 0%

REGION I/ CAR 0.911 1%

REGION II 0.187 0%

REGION III 4.834 8%

REGION IV 10.023 16%

REGION V 2.513 4%

REGION VI 7.077 12%

REGION VII 3.711 6%

REGION VIII 6.466 11%

REGION IX/ ARMM 5.604 9%

REGION X 1.535 3%

REGION XI 2.064 3%

REGION XII 0.524 1%

REGION XIII 0.083 0%

P 49.720 82%

Performance Report

24NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Fund Balance. Out of the P79.596 Billion Funds Raised, P60.733 Billion was obligated leaving a Fund Balance of P18.863 Billion at the end of December 31, 2020. This Fund Balance represents unobligated funds released and allocated for specific purposes broken down as follows:

• Resettlement P 1.054 Billion

Regular Resettlement 0.373

Site Acquisition, development and shelter construction,

Tiwi, Albay0.000

Relocation of ISFs 0.050

Bukidnon Airport 0.000

Regional Resettlement Program-Socialized Housing 0.020

Housing Program for ISFs Living Along Danger Areas in

Metro Manila0.430

ISF’S Affected by the SC’s Mandamus to Clear the Manila

Bay Area0.180

R-10

• Calamity Funds P 10.842 Billion

Emergency Housing Assistance Program/Housing

Assistance Program for Calamity Victims10.842

Reconstruction & Rehabilitation Program Fund

• AFP/PNP/BFP/BJMP/BuCor P 0.750 Billion

• Settlements Upgrading P 0.027 Billion

• Poverty Alleviation Fund P 0.173 Billion

• Community Facilities for 18 Existing Relocation Sites P 0.058 Billion

• Housing Assistance Program for Calamity Victims -

Community Facilities for Typhoon YolandaP 0.086 Billion

• Relocation Assistance P 0.083 Billion

• Trust Funds P 1.031 Billion

Local Housing 0.527

Medium Rise Housing 0.202

National Government Center 0.301

• Corporate Receipts P 2.355 Billion

• Other Sources P 2.404 Billion

P 18.863 Billion

Performance Report

25 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

FHf i n a n c i a l

h i g h l i g h t s

Fiancial Highlights

26NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

2020 FINANCIAL HIGHLIGHTS

HFinancial Highlights

FINANCIAL POSITION

The financial position of NHA comprised of total assets of P165.869 billion, total liabilities of P23.896 billion and net assets/equity of P141.972 billion. The amounts are greater than CY 2019 totals by 10% for total assets, 12% for equity, and less than by 1% for total liabilities.

Assets – P165.868 billion

The NHA’s assets are composed of the following:

Amount %

Cash and Cash Equivalents 5.239 3%

Receivables 80.991 49%

Inventories 63.243 38%

Investments 4.401 3%

Investment Property 0.302 0%

Property and Equipment 1.973 1%

Other Assets 9.719 6%

165.868 100%

Of the total assets, the highest pertains to Receivables of P80.991 billion or 49%, and the next biggest portion pertains to Inventories of P63.243 billion or 38%.

(Unaudited Financial Report)

27 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Receivables consist of P11.552 billion current receivables and P69.439 billion non-current receivables.

Receivables substantially consist of P10.776 billion installment sales covered by Conditional Contract to Sell (CCS) with terms of up to 30 years repayment period by the beneficiaries, rentals of P2.694 billion which primarily pertains to receivable from the Department of Transportation (DOTr) for the lease of the North Triangle property and Loans of P60.257 billion granted to beneficiaries under the various subsidized housing projects.

Inter-agency receivables are advances/non-interest-bearing loans to LGUs, NGAs, and Other Government Corporations which are subject to liquidation or reimbursement.

Inventories consist mainly of developed lots/houses available for disposition/sale and ongoing projects.

As of December 31, 2020, on-going projects or Work-in-Process Inventory marked at P47.336 billion, which majority pertains to Yolanda projects. This will be then transferred either to the Inventory for Sale or Inventory for Distribution account upon completion.

Fiancial Highlights

28NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

For Distribution, this account pertains to infrastructure/community facilities for transfer to various government agencies subject to the submission of DOTA/DODA.

Liabilities – P23.896 billion

Total liabilities of P23.896 billion are composed of current liabilities of P16.689 billion and non-current liabilities of P7.207 billion.

The biggest portion of liabilities pertains to trust liabilities of P10.219 billion. These are

funds entrusted to NHA for special purposes and collection from beneficiaries housing projects covered by Trust Agreement.

For CY 2020, a total of P1.113 billion trust funds were received by NHA from other government agencies, as follows:

DOTr

South Long Haul Project 478,913,000 North-South Commuter Railway Extension Project for PNR N2

631,820,028

DENR

Tagging & Census Validation for ISFs along Pasig River 2,122,563

TOTAL 1,112,855,591

Financial Highlights

29 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Net Assets/Equity – P141.972 billion

The overall net assets/equity or the excess of assets over liabilities of NHA amounting to P141.972 billion increased by 12% from the CY 2019 level of P126.994 billion mainly due to subsidy received from the National Government.

FINANCIAL PERFORMANCE

The aggregate Net Income/Surplus of NHA for CY 2020 is P30.022 million which is P3.539 million higher than that of P26.483 million earned in CY 2019.

Revenues – P2.057 billion

The Authority’s total income of P2.057 billion is mostly attributed to Business Income of P1.993 billion or 97%, consisting mainly of Rental Income of P350 million, Profit realized from Sales of P215 million, Amortization Interest of P680 million, Management fees of P463 million, and Other Income of P285 million.

Fiancial Highlights

30NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Expenses – P2.027 billion

For CY 2020, the total expenses of P2.027 billion were spent for Personnel Services of 1.205 billion, MOOE of P685 million, and Other Expenses of P137 million.

Net Income – P30.022 million

Out of the Authority’s Net Income of P30.022 million, 50% of which or a total of P15.011 million is cash dividend subject for remittance to Bureau of Treasury on or before May 15, 2021, pursuant to RA No. 7656 or Dividend Law Act.

Subsidy releases – P18.140 billion

For CY 2020, The Department of Budget and Management (DBM) released a total of P18.140 billion subsidies, purposely for the following:

AFP/PNP/BFP/BJMP/BuCor Housing Program 4,834,964,000

Reconstruction and Rehabilitation Program Fund for Victims of Typhoon Yolanda and Typhoon Sendong

403,488,000

Emergency Housing Assistance Program 399,642,000

Road Infrastructure Project with Underground Facilities in the Most Affected Area in Marawi City

2,303,115,711

Rehabilitation of Most Affected Areas in Marawi

268,348,180

National Disaster Risk Reduction and Management Fund for Marawi Transitional Housing

20,042,105

Temporary & Permanent Housing for the Families affected by Marawi Conflict

352,359,000

Housing Assistance Program for Calamity Victims-Typhoon Yolanda Victims

9,558,614,000

TOTAL 18,140,572,996

Financial Highlights

31 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

P ip r o j e c t s

i m p l e m e n t e d

Projects Implemented

32NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

iProjects Implemented

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

TOTAL BY PROGRAM 67,785 46,605

RESETTLEMENT PROGRAM 21,113 12,955

HOUSING PROGRAM FOR ISFs LIVING ALONG

DANGER AREAS IN METRO MANILA 216 1,167

IN-CITY RESETTLEMENT - 360

NCR - EAST SECTOR - 360

NGC 3, Harmony Hills, Ph. 1 Package B, LRB

(5-Storey, 12 Bldgs.)

Brgy. Batasan Hills, Quezon City, NCR

240

Manggahan Residence 3, LRB (5-Storey, 7 Bldgs.)

Pasig City, NCR 120

OFF-CITY RESETTLEMENT 216 807

REGION III 216 807

NHA Balanga City Low Rise Housing Project

Brgy. Cataning, Balanga, Bataan; Brgy. Tenejero,

Balanga, Bataan

216

Norzagaray Homes Resettlement Project

Brgy. Anyatam, San Ildefonso, Bulacan 548

Pandi Residences 3 Resettlement Project

Brgy. Mapulang Lupa, Pandi, Bulacan 76

Pandi Village 2 Resettlement Project

Brgy. Mapulang Lupa, Pandi, Bulacan 173

Katuparan Village Phase 2

Brgy. Tigbe, Norzagaray, Bulacan 10

FOR ISFs AFFECTED BY THE SUPREME COURT’S

MANDAMUS TO CLEAN-UP THE MANILA BAY

AREA

2,290 7,191

REGION III 1,000 1,061

Lubao Resettlement

Brgy. Santiago, Lubao, Pampanga 1,000

St. Ildephonsus Village Resettlement Project

Brgy. Anyatam, San Ildefonso, Bulacan 118

Golden Residences Masantol

Brgy. Bebe Anac, Masantol, Pampanga; Brgy. San

Nicolas, Masantol, Pampanga; Brgy. Santo Niño,

Masantol, Pampanga

44

Mariveles Heights Resettlement

Brgy. Cabcaben, Mariveles, Bataan 449

St. Augustine Homes

Brgy. Sapang Maragul, Tarlac City, Tarlac 450

Projects Implemented

33 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

REGION IV 1,290 6,130

Siyudad Kaunlaran (LRB)

Brgy. Molino VI, Bacoor City, Cavite 540

Bambu Villas

Brgy. Lagundi, Morong, Rizal 540 310

Bambu Villas Two

Brgy. Lagundi, Morong, Rizal 210

Rancho Verde 1

Brgy. Malainen, Naic, Cavite 949

Rancho Verde 2

Brgy. Malainen, Naic, Cavite 473

Villa Caridad Homes

Brgy. Malainen, Naic, Cavite 515

St. Mary Magdalene Ville

Brgy. Malainen, Naic, Cavite 775

Malainen Park Residences 1

Brgy. Malainen, Naic, Cavite 924

Malainen Park Residences 2

Brgy. Malainen, Naic, Cavite 234

Hermosa Ville

Brgy. San Salvador, Baras, Rizal 690

San Guillermo Heights

(formerly Virgen Dela Paz Residences)

Brgy. Lagundi, Morong, Rizal

532

Two Ynares Residences

(formerly One Ynares Residences)

Brgy. San Salvador, Baras, Rizal

720

St. Jerome Heights

Brgy. Quisao, Pililla, Rizal 8

FOR ISFs AFFECTED BY INFRASTRUCTURE PROJECTS

12,580 409

NCR - NORTH SECTOR 3,420 -

St. Gregory Homes

(Panghulo Residences - Twenty Three (23) Five

Storey LRBs)

Brgy. Panghulo, Malabon City, NCR

1,380

Projects Implemented

34NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Deparo Residence - Twenty-Three (23) Five Storey

LRBs with Land Development Including Survey

Works (Construction of Twenty-Six (26) – Five

Storey LRBs with Land Development Including

Survey Works)

Deparo, Caloocan City, NCR

1,560

Construction of Thirty-Two (32) Five Storey

Residential Buildings with Land Development

Including Survey Works

(Bagumbong Residences)

Bagumbong, Caloocan City, NCR

480

NCR - EAST SECTOR - 95

Sitio Pingkian (2-Storey Loftable)

Brgy. Pasong Tamo, Quezon City, NCR 95

REGION III - 253

Pandi Village 2 (Expansion Area)

Resettlement Project

Brgy. Mapulang Lupa, Pandi, Bulacan

253

REGION IV 9,100 61

Hyacinth Residences (FOR FAMILIES AFFECTED BY

THE 8.2 SEGMENT PROJECT OF DPWH)

Brgy. Calubcob, Naic, Cavite

2,400

Parkstone Estates

(FOR FAMILIES AFFECTED BY THE 8.2 SEGMENT

PROJECT OF DPWH)

Brgy. Calubcob, Naic, Cavite

2,300

Kristoffee Heights

(FOR FAMILIES AFFECTED BY THE 8.2 SEGMENT

PROJECT OF DPWH)

Brgy. Calubcob, Naic, Cavite

1,412

Kristoffee Heights 2

(FOR FAMILIES AFFECTED BY THE 8.2 SEGMENT

PROJECT OF DPWH)

Brgy. Calubcob, Naic, Cavite

888

Projects Implemented Projects Implemented

35 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Glori-Mor Ville (FOR FAMILIES AFFECTED BY THE

C-5 SOUTHLINK PROJECT OF DPWH)

Brgy. Calubcob, Naic, Cavite

1,100

REGION X 60 -

NHA-Don Carlos Village Phase I

Brgy. Maraymaray, Don Carlos, Bukidnon 60

REGIONAL RESETTLEMENT 6,027 4,188

RESETTLEMENT ASSISTANCE PROGRAM TO LGUs 3,594 3,375

REGION I 396 270

Nueva Era Resettlement Project

Brgy. Poblacion, Nueva Era, Ilocos Norte 64

San Fabian Resettlement Project

Brgy. Cayanga, San Fabian, Pangasinan 57

Binmaley Resettlement Project Phase 2

Brgy. Papagueyan, Binmaley, Pangasinan 50

Sual Resettlement Project Phase 2

Brgy. Pangascasan, Sual, Pangasinan 225

Tayug Resettlement Project Phase 2

Brgy. Amistad, Tayug, Pangasinan 20

Caoayan Resettlement Project

Brgy. Villamar, Caoayan, Ilocos Sur 250

REGION II 156 -

Solana Resettlement Project

Brgy. Gadu, Solana, Cagayan 56

Echague Resettlement Project

Brgy. San Fabian, Echague, Isabela 100

REGION III 73 244

NHA-Talavera Housing Project

Brgy. San Pascual, Talavera, Nueva Ecija 23 23

Botolan Resettlement

Brgy. Taugtog, Botolan, Zambales 50

Guiguinto Resettlement Project Phase 2

Brgy. Malis, Guiguinto, Bulacan 5

NHA - Cabanatuan City Resettlement Project

Phase 2

Brgy. Kalikid Sur, Cabanatuan City, Nueva Ecija

21

Projects Implemented

36NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

NHA - Lapaz Housing Project

Brgy. Sierra, La Paz, Tarlac 45

Land Development of San Luis Resettlement

Brgy. San Sebastian, San Luis, Pampanga 150

REGION V 1,102 103

San Jose Resettlement Project

Brgy. San Jose, Guinobatan, Albay 150

Bato Resettlement Phase 2

Brgy. Agos, Bato, Camarines Sur 184

Mercedes Resettlement Project

Brgy. III, Mercedes, Camarines Norte 260

Milaor Housing Project

Brgy. Maycatmon, Milaor, Camarines Sur 150

Sua Resettlement Project

Brgy. Sua, Camaligan, Camarines Sur 171

Gubat Resettlement Project

Brgy. San Ignacio, Gubat, Sorsogon 187

Mambulo Viejo Resettlement Project

(Housing Construction)

Brgy. Mambulo Viejo, Libmanan, Camarines Sur

100

Sorsogon Resettlement Project

Brgy. Cabid-An, Sorsogon City, Sorsogon 3

REGION VI - 417

Maayon Hills Subdivision Phase 1

Brgy. Poblacion Tabuc, Maayon, Capiz 150

Linda Ville 2

Brgy. West, Candoni, Negros Occidental 267

REGION IX/BARMM 119 149

Kumalarang Resettlement Project

Brgy. Poblacion, Kumalarang, Zamboanga del Sur 119

Land Development of San Antonio Village

Brgy. San Antonio, Katipunan,

Zamboanga del Norte

149

REGION X 1,240 1,294

Medina Resettlement Project

Brgy. Tambagan, Medina, Misamis Oriental 74 30

Projects Implemented Projects Implemented

37 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

CDO-Balubal Relocation Project

Brgy. Balubal, Cagayan de Oro City,

Misamis Oriental

500 500

Golden Harvest Village Ph. 1

Brgy. Bagontaas, Valencia City, Bukidnon 218 109

Dologon Paglaum Village Ph. 3

Brgy. Dologon, Maramag, Bukidnon 125

Bonifacio Bliss Village

Brgy. Demetrio Fernan, Bonifacio,

Misamis Occidental

99

Augmentation and Construction of Permanent

Transition Shelter in Dalama

Brgy. Dalama, Tubod, Lanao del Norte

124

Bagong Pag-asa Organic Village

Brgy. Tacub, Kauswagan, Lanao del Norte 100 2

Opol Resettlement Project

Brgy. Malanang, Opol, Misamis Oriental 40

El Salvador Resettlement Project

Brgy. Cogon, El Salvador City, Misamis Oriental 45

Salay Housing Project

Brgy. Poblacion, Salay, Misamis Oriental 30

NHA Jasaan Resettlement Project

Brgy. Kimaya, Jasaan, Misamis Oriental 124

Dologon Paglaum Village Ph. 2

Brgy. Dologon, Maramag, Bukidnon 163

Manolo Fortich Resettlement

Brgy. Dalirig, Manolo Fortich, Bukidnon 78

Villa Elena Ph. 2

Brgy. Poblacion, Kapatagan, Lanao del Norte 173

REGION XI - 34

Mampanaba Resettlement Project

Brgy. Cabasagan, Municipality of Boston,

Davao Oriental

14

Bolohaton Settler’s Village I

Brgy. Osmeña, Municipality of Compostela,

Compostela Valley

20

REGION XII 100 259

Tampakan Goldenville Project

Brgy. Poblacion, Tampakan, South Cotabato 100

Projects Implemented

38NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Bagong Buhay Resettlement Project Phase 2

Brgy. Bunao, Tupi, South Cotabato 48

Kasadya (Surallah) Village Project

Brgy. Dajay, Surallah, South Cotabato 48

Upper Glad II Resettlement Project Phase 2

Brgy. Upper Glad II, Midsayap, Cotabato 163

REGION XIII 408 605

NHA-Butuan City New Villages 3B

Brgy. Taguibo, Butuan City, Agusan del Norte 297

NHA-Butuan City New Villages 4B

Brgy. Taguibo, Butuan City, Agusan del Norte 111

NHA - Carmen Dreamville

Brgy. Poblacion, Carmen, Agusan del Norte 175

NHA - Butuan City New Village 3A

Brgy. Baan, Butuan City, Agusan del Norte 298

NHA - Alegria Resettlement Project

Brgy. Ombong, Alegria, Surigao del Norte 132

INDIGENOUS PEOPLES 2,433 552

REGION I 45 -

Tadian IP Housing Project

Sitio Agadangan, Brgy. Kayan West, Tadian,

Mt. Province

45

REGION II 200 -

Cordon IP Housing Project

Brgy. Wigan (replacement of Sta. Marcela),

Cordon, Isabela

50

Dinapigue IP Housing Project

Brgy. Digumased, Dinapigue, Isabela 50

Dupax IP Housing Project

Brgy. Belance, Dupax del Norte, Nueva Vizcaya 50

Nagtipunan IP Housing Project

Brgy. San Dionisio II, Nagtipunan, Quirino 50

REGION IX 800 119

Unidos IP Housing Project

Brgy. Unidos, Mutia, Zamboanga del Norte 100 10

Gata-Gata Badjao IP Housing Project

Brgy. Gata-gata, Panglima Estino, Sulu 100

Projects Implemented Projects Implemented

39 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Talipao Badjao IP Housing Project

Brgy. Tuyang, Talipao, Sulu 100

Bulangsi Badjao IP Housing Project

Brgy. Bulangsi, Panamao, Sulu 100

Ungkayapukan Sama-Banguingui IP Housing Project

Brgy. Amaloy, Ungkaya Pukan, Basilan 100

Mantabuan IP Housing Project

(Mantabuan Sama Deya IP Housing Project)

Brgy. Mantabuan Tabunan, Sapa-Sapa, Tawi-Tawi

100 30

Tampakan Badjao IP Housing Project

Tampakan Laminusa, Siasi, Sulu 100

Kolibugan Norte IP Housing Project

Brgy. Panganuran, Sibuco, Zamboanga del Norte 100

Sunop IP Housing Project

Brgy. Sunop, Dumingag, Zamboanga del Sur 10

Ipil IP Housing

Brgy. Bacalan, Ipil, Zamboanga Sibugay 29

R.T. Lim Subanen IP Housing

Brgy. Roxas, R.T. Lim, Zamboanga Sibugay 40

REGION X 141 115

Balmar IP Housing Project

Sitio Balmar, Nabaliwa, Pangantucan, Bukidnon 61

Bonifacio Subanen IP Village

Brgy. Mapurog, Bonifacio, Misamis Occidental 80

Balingasag IP Village

Brgy. Samay, Balingasag, Misamis Oriental 70

NHA - Zubiri IP Village Project

Brgy. Paitan, Quezon, Bukidnon 45

REGION XI 660 46

Malita IPs Housing Project

Sitio Agik-ik, Brgy. Datu Danwata, Malita,

Davao Occidental

60

IP Maibo

Brgy. Maibo, Municipality of Magsaysay,

Davao del Sur

100

Balai Kabauyan Tu Dibabawon

Sitio Lunao, Brgy. Santo Niño, New Corella,

Davao del Norte

Balai Karoyawan

Sitio Talos, Brgy. San Jose, Santo Tomas,

Davao del Norte

100

Projects Implemented

40NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Balai Hibatanan

Sitio Central Baugan, Brgy. Palma Gil, Talaingod,

Davao del Norte

100

Balai Himulayanan

Sitio Lomondong, Brgy. Dagohoy, Talaingod,

Davao del Norte

100

Balai Hirogo-unan

Sitio Basak, Brgy. Sto Niño, Talaingod,

Davao del Norte

100

Balai Pamanoykan

Sitio Cuyas, Brgy. Sto. Niño, Talaingod,

Davao del Norte

100

Ugpaan Village IP Housing Project

Brgy. Caatihan, Municipality of Boston,

Davao Oriental

33

Ganad Village

Brgy. Langgawisan, Municipality of Maragusan,

Compostela Valley

13

REGION XII 446 222

Kapate Tribal Village Project

Brgy. Kapate, Kiamba, Sarangani 100 6

El Solo Village Project

Brgy. Kalaong, Maitum, Sarangani 14

MIST (Makilala Institute of Science and Technology)

IP Dormitory

Brgy. Concepcion, Makilala, Cotabato

96

Napasaan Village IP Housing

Sitio Napasaan, Brgy. Kibia, Matalam, Cotabato 50

Pamantingan Village IP Housing

Brgy. Pamantingan, Esperanza, Sultan Kudarat 100

Tamped Village IP Housing

Brgy. Tamped, Kabacan, Cotabato 100

Polomolok IP Housing Project

Brgy. Maligo, Polomolok, South Cotabato 47

Malungon Highlanders Village

Brgy. Poblacion, Malungon, Sarangani 27

Bacung Kanyeh Tribal Village

Brgy. Bacong, Tulunan, Cotabato 68

Datu Sandigan Village Phase 3

Brgy. Kimaruhing, President Roxas, Cotabato 50

Projects Implemented Projects Implemented

41 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Sen. Ninoy Aquino IP Housing Project

Sitio Tamangan, Brgy. Kuden, Sen. Ninoy Aquino,

Sultan Kudarat

10

REGION XIII 141 50

NHA-Prosperidad Tribal Village

Brgy. Aurora and Brgy. Poblacion, Prosperidad,

Agusan del Sur

141

NHA - Kitcharao Tribal Village

Brgy. Canaway, Kitcharao, Agusan del Norte 50

FORMER REBELS - 261

REGION X - 261

CDO Mid-Land Valley Homes

Cagayan de Oro City, Misamis Oriental 190

Pine Ville

San Jose, Malaybalay City, Bukidnon 71

SETTLEMENTS UPGRADING 966 997

NCR - EAST SECTOR 150 196

Dolores Estate Survey & Titling Works

Brgy. Batasan Hills, Quezon City, NCR 150

Bulelak, Survey & Titling Works

Brgy. Malanday, Marikina City, NCR

(Funded & undertaken by LGU)

196

NCR - EAST SECTOR - 801

Structural, Topographic, and Subdivision Survey of

5.8 Hectares Property in PCV Area (2017)

Brgy. Western Bicutan, Taguig City, NCR

801

REGION I 102 -

Paoay Lake View Upgrading Project

(October 2020 recalibrated target)

Brgy. Suba, Paoay, Ilocos Norte

102

REGION V 714 -

Caroyroyan Res. Project Ph. 1

(Presidential Proclamation 593)

Brgy. Caroyroyan, Pili, Camarines Sur

424

Projects Implemented

42NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Mabolo Homes Subdivision

Sitio Pagdaicon, Brgy. Mabolo, Naga City,

Camarines Sur

290

HOUSING PROGRAM FOR GOVERNMENT

EMPLOYEES 6,682 1,179

AFP/PNP HOUSING PROGRAM 6,682 1,179

REGION I 400 -

Sta. Monica Homes

Brgy. Sta. Asuncion, San Nicolas, Ilocos Norte 400

REGION III 1,107 350

Pandi Encamp

Pandi, Bulacan 375

Mount Arayat Residences

Arayat, Pampanga 732

Casa San Miguel

Brgy. San Juan de Valdez, San Jose, Tarlac 350

REGION IV 500 -

Palm Tree Hauz

Puerto Princesa City, Palawan 500

REGION VII 850 -

South Park Residences (LRB)

Brgy. Pulangbato, Cebu City 850

REGION VIII 400 -

Crown Estates

Brgy. Bobonon, Alangalang, Leyte 400

REGION IX 925 -

Cabaluay Place

Brgy. Cabaluay, Zamboanga City 925

REGION X - 538

Christine Villas

Balo-i, Lanao del Norte 538

REGION XI 2,500 196

Maresca Homes (Formerly Adelaide Homes)

Davao City, Davao del Sur 1,000

Projects Implemented Projects Implemented

43 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Xavier Heights

Catalunan Grande, Davao City, Davao del Sur 1,000

Ciudad de Dahican

Brgy. Dahican, Mati City, Davao Oriental 500

Blue Farm Villa (formerly Lantaw Homes)

Brgy. Biao Escuela, Tugbok District, Davao City,

Davao del Sur

2

Madayaw Residences - AFP/PNP Project Davao

Brgy. Talomo, Davao City, Davao del Sur 160

Stonerise Homes (Freedom Residences)

Brgy. Cuambogan, Tagum City, Davao del Norte 34

REGION XII - 95

SofiaVille(500)

Brgy. Lagao, General Santos City, South Cotabato 95

HOUSING PROGRAM FOR CALMITY VICTIMS 17,472 11,734

PERMANENT HOUSING 17,472 10,591

TYPHOON YOLANDA 7,930 10,151

REGION IV 2,670 -

Coron Residences

Brgy. Decalachao, Coron, Palawan 1,200

Coron Heights

Brgy. Decalachao, Coron, Palawan 1,470

REGION V - 386

Presentacion Resettlement Project

Brgy. Pili, Presentacion, Camarines Sur 298

Balud Resettlement Project

Brgy. Tonga, Balud, Masbate 88

REGION VI 4,760 4,208

Ajuy

Ajuy, Iloilo 1,500

Balasan (Kinalkalan Peoples Village)

Brgy. Kinalkalan, Balasan, Iloilo 600

Culasi (Culasi Permanent Housing Project)

Culasi, Antique (Brgy. Paningayan, Culasi, Antique) 750

Tibiao (San Francisco Norte Peoples Village)

Tibiao, Antique (Brgy. San Francisco Norte,

Tibiao, Antique)

1,200 310

Projects Implemented

44NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Jamindan (Jamindan Permanent Housing Project)

Brgy. Agambulong, Jamindan, Capiz 710

Banate People’s Village - Phase 3

Brgy. Carmelo, Banate, Iloilo 347

Concepcion People’s Village Site 2

Brgy. Bacjawan Norte, Concepcion, Iloilo 697

Gogo People’s Village Site 1

Brgy. Gogo, Estancia, Iloilo 165

Batan Permanent Housing Site 4

Brgy. Bay-ang, Batan, Aklan 100

New Washington - Site 5

Brgy. Lawa-an, New Washington, Aklan 37

Olympus Residences Site - 3

Brgy. Ochando, New Washington, Aklan 314

Olympus Residences Site - 4

Brgy. Ochando, New Washington, Aklan 351

Olympus Residences Site - 5

Brgy. Candelaria, New Washington, Aklan 37

Tangalan Housing Project

Brgy. Jawili, Tangalan, Aklan 120

Bagongbayan Peoples Village

Brgy. Bagongbayan, Buruanga, Aklan 8

Numancia Housing Project

Brgy. Albasan, Numancia, Aklan 126

Barbaza Residences 2

Brgy. Magtulis, Barbaza, Antique 99

Patnongon Vista Residences

Brgy. Tamayoc, Patnongon, Antique 110

GBB People’s Village

Brgy. Importante, Tibiao, Antique 16

Green Park Ville

Brgy. Takas, Valderrama, Antique 122

Atabay Homes

Brgy. Esparar, Barbaza, Antique 200

Brooksville 1

Brgy. Punta Salong, Manapla, Negros Occidental 348

Brooksville 2

Brgy. Punta Salong, Manapla, Negros Occidental 270

Proposed Construction of 690 Units

STY NHA Project

Concepcion, Iloilo

74

Projects Implemented Projects Implemented

45 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

PDMN People’s Village 1 (Dumangas Site 3)

Brgy. Lublub, Dumangas, Iloilo 42

PDMN People’s Village 2 (Dumangas Site 4)

Brgy. Lublub, Dumangas, Iloilo 235

Banate People’s Village 2

Brgy. Magdalo (Site 2), Banate, Iloilo 49

San Jose Ville Housing Project 4

Brgy. San Jose (Site 4), Roxas City, Capiz 31

REGION VII - 1,342

Balai Bantayan Phase 2

Brgy. Kabac, Bantayan Island, Cebu 210

Balai Bantayan Phase 3

Brgy. Kabac, Bantayan Island, Cebu 120

Lantawan Homes

Brgy. Antipolo, Tuburan, Cebu 126

Lawis Residences

Brgy. Lawis, San Remigio, Cebu 211

Northview Park Homes 2

Brgy. Panugnawan, Medellin, Cebu 10

St. Francis Park Homes 1

Brgy. Kangwayan, Madridejos, Cebu 188

St. Francis Park Homes 2

Brgy. Kodia, Madridejos, Cebu 199

St. Francis Park Homes 3

Brgy. Kangwayan, Madridejos, Cebu 72

St. Vincent Ferrer Homes 1

Brgy. Banban, Bogo City, Cebu 90

Villa Mercedes 1

Brgy. Kampingganon, Bantayan, Cebu 35

Villa Mercedes 2

Brgy. Kampingganon, Bantayan, Cebu 30

Villa Mercedes 3

Brgy. Sillon, Bantayan, Cebu 32

Green Heights 1 (Daanbantayan 3)

Brgy. Tominjao, Daanbantayan, Cebu 19

REGION VIII 500 4,215

San Antonio EFCO Subdivision

Brgy. Malbog, Tolosa, Leyte 500

Projects Implemented

46NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Ver Dominic Heights Subd. Site 1

Brgy. San Jose, Palo, Leyte 72

Ver Dominic Heights Subd. Site 2

Brgy. San Jose, Palo, Leyte 8

Greendale Residence 3

Brgy. San Isidro (Suhi), Tacloban City, Leyte 3

Sta. Fe Village Site 1

Brgy. Bulod, Santa Fe, Leyte 20

Pope Francis Village

Brgy. Barangay 99 - Diit, Tacloban City, Leyte 137

Carigara Housing Project

Brgy. Parag-um, Carigara, Leyte 342

Carigara Housing Project 1

Brgy. Sagkahan, Carigara, Leyte 60

St. Michael Residences

Brgy. Tanghas, Tolosa, Leyte 100

Barugo Town Ville Phase 1

Brgy. Busay, Barugo, Leyte 1

Barugo Town Ville Phase 2

Brgy. Busay, Barugo, Leyte 32

Capoocan Village

Brgy. Balucanad, Capoocan, Leyte 13

San Antonio Homes

Brgy. Linao, San Isidro, Leyte 68

Coconut Grove

Brgy. Dita, Julita, Leyte 68

Villa Verde

Brgy. Iligay, Villaba, Leyte 61

Vermatthew Heights 1

Brgy. Bato, Biliran, Biliran 80

Vermatthew Heights 2

Brgy. Bato, Biliran, Biliran 122

Hernani Town Ville

Brgy. Nagaja, Hernani, Eastern Samar 713

Balangiga Town Ville

Brgy. Cansumangcay, Balangiga, Eastern Samar 43

Gen. MacArthur

Brgy. Vigan, General MacArthur, Eastern Samar 200

Quinapondan Town Ville Site 1, 2 & 3

Brgy. Buenavista, Quinapondan, Eastern Samar 347

Salcedo Housing Project

Brgy. Palanas, Salcedo, Eastern Samar 42

Projects Implemented Projects Implemented

47 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

San Lorenzo Residences

Brgy. Buyayawon, Mercedes, Eastern Samar 139

Green Park 1

Brgy. Sawa, Basey, Samar 642

Green Park 2

Brgy. Roxas, Basey, Samar 392

Sta.RitaGreenfields

Brgy. Old Manunca, Santa Rita, Samar 133

North Hill Arbours 1

Brgy. Santo Niño (Suhi), Tacloban City, Leyte 2

St. Francis Village 2

Brgy. Suhi, Tacloban City, Leyte 138

Kawayan Ville

Brgy. Kawayan, Tacloban City, Leyte 237

TYPHOON PABLO 19 -

REGION XI 19 -

Balai Maal’lag Offsite

Municipality of New Bataan, Davao de Oro 19

TYPHOON NINA 1,036 -

REGION V 1,036 -

Bagamanoc Resettlement Project

Brgy. San Rafael, Bagamanoc, Catanduanes 98

Our Lady’s Village Residential Project

Brgy. San Isidro and Cavinitan, Virac, Catanduanes 938

TYPHOON USMAN 2,593 -

REGION V 2,593 -

Buhi Resettlement Project

Brgy. De La Fe, Buhi, Camarines Sur 928

Tigaon Resettlement Project

Brgy. Salvacion, Tigaon, Camarines Sur 1,053

Bagumbayan Resettlement Project (Site 1)

Brgy. Bagumbayan, Tiwi, Albay 612

NAGA LANDSLIDE 192 -

REGION VII 192 -

Naga Permanent Housing Project

Brgy. Inoburan and Brgy. Tinaan, City of Naga, Cebu 192

Projects Implemented

48NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

MINDANAO EARTHQUAKE 3,702 -

REGION XI 2,002 -

Magsaysay Permanent Housing

Municipality of Magsaysay, Davao del Sur 2,002

REGION XII 1,700 -

Construction of 1,700 Permanent Housing Units

Intended for Earthquake-affected Families in

Kidapawan City, Cotabato

Brgy. Ilomavis, Kidapawan, Cotabato; Brgy.

Balabag, Kidapawan, Cotabato; Brgy. Indangan,

Kidapawan, Cotabato; Brgy. Perez, Kidapawan,

Cotabato; Brgy. Ginatilan, Kidapawan, Cotabato;

Brgy. Nuangan, Kidapawan, Cotabato

1,700

6.5 MAGNITUDE EARTHQUAKE IN LEYTE - 415

REGION VIII - 415

Ormoc Housing Project

(Ormoc Highlands 1 & 2)

(Formerly Danao, Gaas, and

Milagro Housing Project)

Ormoc City, Leyte

415

MARAWI CONFLICT 2,000 25

REGION IX 2,000 25

Pamayandeg Ranaw Residences

Brgy. Kilala, Marawi City, Lanao del Sur 1,000 25

Pamayandeg Ranaw Residences

Brgy. Mipantao Gadongan, Marawi City,

Lanao del Sur

1,000

TRANSITORY HOUSING - 1,143

MARAWI CONFLICT - 1,143

REGION IX - 1,143

Site 2

Brgy. Boganga, Marawi City, Lanao del Sur; Brgy.

Rorogagus, Marawi City, Lanao del Sur; Brgy. Dulay,

Marawi City, Lanao del Sur

843

Area 8

Brgy. Sagonsongan, Marawi City, Lanao del Sur 300

Projects Implemented Projects Implemented

49 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

EMERGENCY HOUSING ASSISTANCE PROGRAM 21,552 19,740

REGION III 93 93

Fire Victims - Brgy. Antipona, Bocaue, Bulacan

Brgy. Antipona, Bocaue, Bulacan 93 93

REGION IV 11,020 10,756

Municipality of Bulalacao (Typhoon Tisoy)

Bulalacao, Oriental Mindoro 5,920 5,920

EHAP for the Families Affected by Fire Incident

Puerto Princesa City, Palawan 85 85

EHAP for the Families Affected by Typhoon Rolly

Oriental Mindoro 2,729 2,680

EHAP for the Families Affected by Storm Surge

Paluan, Occidental Mindoro 23 23

EHAP for the Families Affected by Typhoon Rolly

Occidental Mindoro 784 753

EHAP for the Families Affected by Typhoon Rolly

Marinduque 707 694

EHAP for the Families Affected by Fire

Antipolo, Rizal; Rodriguez, Rizal; San Mateo, Rizal;

Cainta, Rizal; Taytay, Rizal

201 72

EHAP for the Families Affected by Typhoon

Cardona, Rizal 10

EHAP for the Families Affected by Fire

Biñan, Laguna; San Pedro, Laguna; Sta. Rosa,

Laguna; Sta. Cruz, Laguna

309 301

EHAP for the Families Affected by Typhoon Rolly

San Pablo, Laguna; Bay, Laguna; Alaminos, Laguna 43 43

EHAP for the Families Affected by Typhoon Rolly

Taysan, Batangas; Ibaan, Batangas; San Nicolas,

Batangas

75 73

EHAP for the Families Affected by Fire

Lucena, Quezon 43 43

EHAP for the Families Affected by Typhoon Rolly

Atimonan, Quezon; Padre Burgos, Quezon; Calauag,

Quezon

91 69

REGION V 5,087 5,066

Municipality of Daraga (Typhoon Tisoy)

Daraga, Albay 146 146

Municipality of Tiwi (Typhoon Tisoy)

Tiwi, Albay 249 249

Projects Implemented

50NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Municipality of Tabaco City (Typhoon Tisoy)

Tabaco City, Albay 1,306 1,289

Municipality of Daraga Batch 2 (Typhoon Tisoy)

Daraga, Albay 522 522

Municipality of Guinobatan (Typhoon Tisoy)

Guinobatan, Albay 652 652

Municipality of Gainza (Typhoon Tisoy)

Gainza, Camarines Sur 36 36

Municipality of San Fernando (Typhoon Tisoy)

San Fernando, Camarines Sur 47 47

Municipality of Canaman (Typhoon Tisoy)

Canaman, Camarines Sur 150 150

Municipality of Del Gallego (Typhoon Tisoy)

Del Gallego, Camarines Sur 15 15

Municipality of Ragay (Typhoon Tisoy)

Ragay, Camarines Sur 82 82

Municipality of Libmanan (Typhoon Tisoy)

Libmanan, Camarines Sur 262 262

Municipality of Minabalac (Typhoon Tisoy)

Minabalac, Camarines Sur 124 124

Municipality of Tigaon (Typhoon Tisoy)

Tigaon, Camarines Sur 184 184

Municipality of Camaligan (Typhoon Tisoy)

Camaligan, Camarines Sur 73 73

Municipality of Milaor (Typhoon Tisoy)

Milaor, Camarines Sur 50 50

Municipality of Baao (Typhoon Tisoy)

Baao, Camarines Sur 155 153

Municipality of Bombon (Typhoon Tisoy)

Bombon, Camarines Sur 94 94

Municipality of Magarao (Typhoon Tisoy)

Magarao, Camarines Sur 104 104

Municipality of Iriga City (Typhoon Tisoy)

Iriga City, Camarines Sur 836 834

REGION VII 1,393 382

Brgy. Mambaling, Cebu City

(Project Cost: P0.140M) 60 60

Sitio Panting, Brgy. San Roque, Cebu City (Project

Cost: P3.10M) 105 101

Brgy. Suba, Cebu City (Project Cost: P7.77M) 369 5

Sporadic Fires in Cebu City (Project Cost: P1.65M) 55

Projects Implemented Projects Implemented

51 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Brgy. Tabok, Mandaue City (Project Cost: P5.30M) 173 5

Brgy. Centro, Mandaue City (Project Cost: P0.55M) 24 24

Brgy. Ibabao-Estancia, Mandaue City (Project Cost:

P4.29M) 123 10

Brgy. Mambaling, Cebu City (Project Cost: P0.410M)

(Housing Materials Assistance for Fire Victims) 82

Brgy. Guadalupe, Carcar City

(Project Cost: P0.065M)

(Housing Materials Assistance for Fire Victims)

13

Sitio Lourdes, Brgy. Inayawan, Cebu City

(Project Cost: P1.350M) 45

Sitio Capadul 1 & 2, Brgy. Duljo Fatima, Cebu

(Project Cost: P1.68M) 46 5

Sitio Indian, Brgy. T. Padilla, Cebu City

(Project Cost: P0.630M) 18 5

Sitio Sto. Nino, Brgy. Luz, Cebu City

(Project Cost: P1.680M) 51 5

Sitio Riverside, Panagdait, Brgy. Kasambagan, Cebu

City (Project Cost: P2.130M) 67 5

Brgy. Daanlungsod, Medellin, Cebu

(Project Cost: P0.030M) 1 1

Brgy. Caputatan Sur, Medellin, Cebu

(Project Cost: P0.030M) 1 1

Brgy. Lamintak Norte, Medellin, Cebu

(Project Cost: P0.030M) 1 1

Brgy. Pulo, Alcantara, Cebu

(Project Cost: P0.030M) 1 1

Brgy. Cansojong, Talisay City, Cebu

(Project Cost: P0.770M) 27 26

Purok 3, Brgy. Totolan, Dauis, Bohol

(Project Cost: P0.370M)

Purok 3, Brgy. Totolan, Dauis, Bohol

17 17

Brgy. Cogon, Tagbilaran City, Bohol

(Project Cost: P0.030M)

Brgy. Cogon, Tagbilaran City, Bohol

1 1

Purok Gumamela, Brgy. Calindagan, Dumaguete

City, Negros Oriental (Project Cost: P1.785M) 60 60

Purok Sampaguita, Brgy. Calindagan,

Dumaguete City, Negros Oriental 30 30

Brgy. Looc, Dumaguete City, Negros Oriental

(Project Cost: P0.490M) 18 18

Projects Implemented

52NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Brgy. Cangmalalag, Larena, Siquijor

(Project Cost: P0.030M) 1

Brgy. Talayong, Lazi, Siquijor

(Project Cost: P0.090M) 3

Purok Tubod, Sta. Catalina, Negros Oriental

(Project Cost: P0.030M) 1 1

REGION VIII 82 82

Tacloban City

Brgy. 37 Reclamation Area, Tacloban City, Leyte 2 2

Naval (Typhoon Ursula)

Naval, Biliran 80 80

REGION IX/ARMM 1,783 1,783

EHAP for 322 Families in Brgy. Sto Nino, Brgy.

Balangasan, and Brgy. Sta. Lucia Affected by Fire

last 24 February 2020, 04 March 2020, and

14 March 2020

Pagadian City, Zamboanga del Sur

322 322

EHAP for 84 Families Affected by Fire Incident at

Brgy. Panggao Saduc, Marawi City last

12 March 2020

Marawi City, Lanao del Sur

84 84

EHAP for 1,377 Families Affected by Fire in Brgy.

Tulay, Brgy. Takut-Takut, and Brgy. Chines Pier last

03 February 2020

Jolo, Sulu

1,377 1,377

REGION X 616 233

Families Affected by Fire Incidents in Barangays

Carmen and Lapasan

Brgy. Carmen, Cagayan de Oro City, Misamis

Oriental; Brgy. Lapasan, Cagayan de Oro City,

Misamis Oriental

61 61

Families Affected by Fire Incidents in Barangays

Carmen and Tablon

Brgy. Carmen, Cagayan de Oro City, Misamis

Oriental; Brgy. Tablon, Cagayan de Oro City,

Misamis Oriental

10 10

Projects Implemented Projects Implemented

53 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Families Affected by Fire Incident last 02 February

2020 in Bayabas, Cagayan de Oro City

Zone 1, Upper Sto. Niño (Buara), Bayabas,

Cagayan de Oro City, Misamis Oriental

16 16

Families Affected by Fire Incident last 23 February

2020 in Puerto, Cagayan de Oro City

Zone 3, Sitio Balocbaloc, Puerto,

Cagayan de Oro City, Misamis Oriental

7 7

Families Affected by Fire Incident on 28 February

2020 in Brgy. 18, Cagayan de Oro City

Brgy. 18, Cagayan de Oro City, Misamis Oriental

25 25

EHAP for Families Affected by Fire Incident last 20

March 2020 in Lapasan, Cagayan de Oro City

Lapaz II, Kolambog, Brgy. Lapasan,

Cagayan de Oro City, Misamis Oriental

25 25

EHAP for Families Affected by Fire Incident last

15 April 2020 in Lunao, Gingoog City

Brgy. Lunao, Gingoog City, Misamis Oriental

6 6

Families Affected by Fire Incidents in Initao,

Misamis Oriental

Purok 14, Brgy. Poblacion, Initao, Misamis Oriental;

Purok 1, Brgy. Apas, Initao, Misamis Oriental

10 10

EHAP for Families Affected by Fire Incident last 6

December 2019 in Lapasan, Cagayan de Oro City

Zone 4, Sitio San Lazaro, Brgy. Lapasan,

Cagayan de Oro City, Misamis Oriental

5 5

EHAP for Families Affected by Fire Incident last 21

June 2020 in Carmen, Cagayan de Oro City

Zone 3, Max Suniel, Binonoan Creek, Brgy. Carmen,

Cagayan de Oro City, Misamis Oriental

47

EHAP for Families Affected by Fire Incident last 23

June 2020 in Carmen, Cagayan de Oro City

Zone 10, Lower Dagung, Brgy. Carmen,

Cagayan de Oro City, Misamis Oriental

2

EHAP for Families Affected by Fire Incident last 1

July 2020 in Brgy. 40, Cagayan de Oro City

#183, Hayes Street, Brgy. 40, Cagayan de Oro City,

Misamis Oriental

5

Projects Implemented

54NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

HOMA for Families Affected by Fire Incident last 15

April 2019 in Jasaan, Misamis Oriental

Zone 1, Zone 2 & Zone 3 (PBCM Compound), Brgy.

San Antonio, Jasaan, Misamis Oriental

(Housing Materials Assistance for Fire Victims)

70

EHAP for Families Affected by Fire Incident on 26

July 2020 in Lapasan, Cagayan de Oro City

Zone 2, San Lazaro, Brgy. Lapasan,

Cagayan de Oro City, Misamis Oriental

86

EHAP for Families Affected by Fire Incident on 24

July 2020 in Lapasan, Cagayan de Oro City

Centro Kolambog, Brgy. Lapasan,

Cagayan de Oro City, Misamis Oriental

22

EHAP for Families Affected by Fire Incident on 10

August 2020 in Gusa, Cagayan de Oro City

Purok 4-B, Brgy. Gusa, Cagayan de Oro City,

Misamis Oriental

15

EHAP for Families Affected by Fire Incident on 12

August 2020 in Brgy. 22, Cagayan de Oro City

Gaabucayan, Brgy. 22, Cagayan de Oro City,

Misamis Oriental

2

EHAP for Families Affected by Fire Incidents in

Zone 1, Purok Mangga

Brgy. Tubod, Iligan City, Lanao del Norte

18 18

EHAP for Families Affected by Fire Incidents in

Purok 7, Poblacion and Purok 7, Bliss Lapasan

Clarin, Misamis Occidental

8 8

EHAP for Families Affected by Fire Incidents in

Purok Santa Teresita, Brgy. Tubod; Purok 8, Brgy.

Buru-un and Zone 6, Badelles St., Brgy. Poblacion

Brgy. Tubod, Iligan City, Lanao del Norte;

Brgy. Buru-un, Iligan City, Lanao del Norte;

Brgy. Poblacion, Iligan City, Lanao del Norte

21 21

EHAP for Families Affected by Fire Incidents in

Purok Madanihon and Purok Riverside

Brgy. Tinago, Ozamiz City, Misamis Occidental

21 21

Projects Implemented Projects Implemented

55 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

EHAP for Families Affected by Fire Incidents in

Purok Tulay, Brgy. Agusan Canyon; Purok 2, Brgy.

Sto. Niño; and Purok 4, Brgy. Diclum, Manolo

Fortich, Bukidnon

Brgy. Agusan Canyon, Manolo Fortich, Bukidnon;

Brgy. Sto. Niño, Manolo Fortich, Bukidnon;

Brgy. Diclum, Manolo Fortich, Bukidnon

8

EHAP for Families Affected by Flood Incidents in

Brgy. Alae & Lunocan, Manolo Fortich, Bukidnon

Brgy. Alae, Manolo Fortich, Bukidnon;

Brgy. Lunocan, Manolo Fortich, Bukidnon

12

EHAP for Families Affected by Fire Incidents in

Brgy. Crossing, Libona, Bukidnon

Brgy. Crossing, Libona, Bukidnon

6

EHAP for Families Affected by Fire Incident in Four

(4) Areas of Tubod, Lanao del Norte

(P-2 of Brgy. Bulod; P-5 of Brgy. Tubaran; P-1 RCIS

of Poblacion; P-11 of Brgy. Malingao, Tubod,

Lanao del Norte)

Tubod, Lanao del Norte

5

EHAP for Families Affected by Whirlwind Incident

on 5 August 2020 in Six (6) Areas of Tudela,

Misamis Occidental

Brgy. Basirang, Tudela, Misamis Occidental;

Brgy. Centro Napu, Tudela, Misamis Occidental;

Brgy. Sebac, Tudela, Misamis Occidental;

Brgy. Silongon, Tudela, Misamis Occidental;

Brgy. Taguima, Tudela, Misamis Occidental;

Brgy. Upper Centro, Tudela, Misamis Occidental

100

EHAP for Families Affected by Fire Incident on 10

September 2020 in Panaon, Misamis Occidental

Brgy. Sumasap, Panaon, Misamis Occidental

1

EHAP for Families Affected by Fire Incident on

12 September 2020 in Purok Humayan

Brgy. Balatacan, Tangub City, Misamis Occidental

1

EHAP for Families Affected by Fire Incident on 13

September 2020 in Kolambugan, Lanao del Norte

Purok 1, Brgy. Caromatan, Kolambugan,

Lanao del Norte

1

Projects Implemented

56NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

REGION XI 999 866

EHAP Davao Coastal Barangays (Typhoon)

Purok 23-B Aroma & Purok 23 Isla Suerte,

Davao City, Davao del Sur

13 13

EHAP Davao Coastal Barangays (Typhoon)

Brgy. 21-C Poblacion B District, Davao City,

Davao del Sur

24 24

EHAP Davao Coastal Barangays (Typhoon)

Brgy. 22-C Poblacion B District, Davao City,

Davao del Sur

8 8

EHAP Davao Coastal Barangays (Typhoon)

Purok 6B Brgy. 31-D Poblacion B District,

Davao City, Davao del Sur

10 10

EHAP Davao Coastal Barangays (Typhoon)

Dumalag I & II Matina Aplaya, Davao City,

Davao del Sur

6 6

EHAP Davao Coastal Barangays (Typhoon)

Purok 12 St. John, Brgy. 76-A, Davao City,

Davao del Sur

9 9

EHAP Davao Coastal Barangays (Typhoon)

Brgy. 23-C Isla Verde, Poblacion District,

Davao City, Davao del Sur

90 90

EHAP Brgy. 23-C (Fire)

Brgy. 23-C Isla Verde, Poblacion District,

Davao City, Davao del Sur

242 242

EHAP Matina Aplaya (Fire)

Brgy. Matina Aplaya Talomo District,

Davao City, Davao del Sur

126 126

EHAP Matina Aplaya 2 (Fire)

Brgy. Matina Aplaya Talomo District,

Davao City, Davao del Sur

1 1

EHAP Tugbok (Fire)

Purok 23 Talipapa, Brgy. Sto. Nino, Tugbok District,

Davao City, Davao del Sur

27 27

EHAP Bankerohan (Fire)

Purok 2 Brgy. 5-A Bankerohan, Davao City,

Davao del Sur

132 132

EHAP Matina Pangi (Fire)

Brgy. Matina Pangi Talomo District, Davao City,

Davao del Sur

17 17

Projects Implemented Projects Implemented

57 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

EHAP Matanao (Earthquake)

Lot 26 Block 19 Brgy. Poblacion Matanao,

Davao del Sur

1 1

EHAP Malalag (Earthquake)

Municipality of Malalag, Davao del Sur 1 1

EHAP Purok 32 Holy Trinity (Fire)

Purok 32 Holy Trinity Sparrowe Kabacan Brgy. 76-A,

Davao City, Davao del Sur

8 8

EHAP Agdao (Fire)

Brgy. Governor Vicente Duterte Agdao District,

Davao City, Davao del Sur

3 3

EHAP Ulas 1 (Fire)

Purok 44 Mangahan Ulas, Brgy. Talomo Proper,

Davao City, Davao del Sur

2 2

EHAP Talomo (Fire)

Purok 5 Kalamboan Cadena de Amor

Brgy. Talomo Proper, Davao City, Davao del Sur

5 5

EHAP Cabantian (Fire)

Greenland II Barangay Cabantian,

Davao City, Davao del Sur

2 2

EHAP Ulas 2 (Fire)

Purok 44 Mangahan Ulas, Brgy. Talomo Proper,

Davao City, Davao del Sur

3 3

EHAP 76-A (Fire)

Purok 2 76-A Bucana, Davao City, Davao del Sur 14 14

EHAP76-A(1beneficiary)(Fire)

Purok 2 76-A Bucana, Davao City, Davao del Sur 1 1

EHAP Bunawan (Fire)

Purok 5-B Km. 24 Brgy. Bunawan District,

Davao City, Davao del Sur

1 1

EHAP Brgy. 21-C (Fire)

#44 Jacinto Block 81, Brgy. 21-C, Davao City,

Davao del Sur

7 7

EHAP Buhangin (Fire)

Purok Sta. Maria Dumanlas, Brgy. Buhangin Proper,

Davao City, Davao del Sur

8 8

EHAP Catalunan Grande (Landslide)

Brgy. Catalunan Grande, Davao City, Davao del Sur 2 2

EHAP Mandug (Fire)

Purok Sto. Nino, Timawa, Brgy. Mandug, Davao City,

Davao del Sur

2

Projects Implemented

58NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

EHAP Panacan (Fire)

Sunrise Village, Km. 14, Panacan, Davao City,

Davao del Sur

32

EHAP Agdao (Fire)

Sitio Sto. Nino, Brgy. Leon Garcia, Agdao,

Davao City, Davao del Sur

66

EHAP Padada (Fire)

Purok 3, Brgy. Palili, Padada, Davao del Sur 1 1

EHAP Lapu-Lapu (Fire)

Purok 9, South Bay, Brgy. Lapu-Lapu, Agdao,

Davao City, Davao del Sur

29

EHAP Catalunan Pequeño (Fire)

Purok 22, Catalunan Pequeño, Talomo,

Davao City, Davao del Sur

1

EHAP San Miguel (Tagum 1) (Fire)

BLISS Brgy. San Miguel, Tagum City,

Davao del Norte

1 1

EHAP Tagbaobo (IGaCoS) (Fire)

Brgy. Tagbaobo Kaputian Island Garden

City of Samal, Davao del Norte

3 3

EHAP Mankilam 1 (Tagum 1) (Fire)

Caimito, Brgy. Mankilam, Tagum City,

Davao del Norte

2 2

EHAP Magugpo South (Tagum 1) (Fire)

Lapu-Lapu, Brgy. Magugpo South, Tagum City,

Davao del Norte

1 1

EHAP Visayan Village (Tagum 1) (Fire)

Purok Dahlia Brgy. Visayan Village Tagum City,

Davao del Norte

1 1

EHAP Bincungan (Tagum 1) (Fire)

Purok Orchids Brgy. Bincungan, Tagum City,

Davao del Norte

2 2

EHAP Mankilam 2 (Tagum 1) (Fire)

Garciaville Brgy. Mankilam Tagum City,

Davao del Norte

3 3

EHAP Cogon (IGaCoS) (Fire)

Brgy. Cogon Babak District

Island Garden City of Samal, Davao del Norte

3 3

EHAP Toril (IGaCoS) (Fire)

Brgy. Toril Babak District

Island Garden City of Samal, Davao del Norte

1 1

Projects Implemented Projects Implemented

59 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

EHAP Canocotan (Tagum 1) (Fire)

Purok 2, Tandang Sora, Brgy. Canocotan

Tagum City, Davao del Norte

1 1

EHAP Liboganon (Tagum 1) (Fire)

Purok 2 Brgy. Liboganon Tagum City,

Davao del Norte

1 1

EHAP St. Niño, (IGaCoS) (Fire)

Brgy. Sto. Niño Babak District

Island Garden City of Samal, Davao del Norte

2 2

EHAP Apokon (Tagum 1) (Fire)

Villa Consuelo, Brgy. Apokon, Tagum City,

Davao del Norte

10 10

EHAP Peñaplata (IGaCoS) (Fire)

Brgy. Peñaplata Island Garden City of Samal,

Davao del Norte

5 5

EHAP Peñaplata (IGaCos) (Fire)

Purok 5, Brgy. Peñaplata, Samal District,

Island Garden City of Samal, Davao del Norte

1 1

EHAP Madaum (Tagum 2) (Fire)

Purok 2, Brgy. Madaum, Tagum, Davao del Norte 1 1

EHAP Villa Paraiso (Tagum 2) (Fire)

Villa Paraiso, Brgy. Visayan Village, Tagum,

Davao del Norte

1 1

EHAP Canocotan (Tagum 2) (Fire)

Purok 5-A, Brgy. Canocotan, Tagum,

Davao del Norte

1 1

EHAP Pasabangan (Tagum 2) (Fire)

Purok Mangga, Brgy. Pagsabangan, Tagum,

Davao del Norte

1 1

EHAP Busaon (Tagum 3) (Tornado)

Purok 4 & 5, Brgy. Busaon, Tagum City,

Davao del Norte

4 4

EHAP Liboganon (Tagum 3) (Tornado)

Purok 5, Brgy. Liboganan, Tagum City,

Davao del Norte

3 3

EHAP Visayan (Tagum 3) (Fire)

Purok Budiongan, Brgy. Visayan Village, Tagum City,

Davao del Norte

1 1

EHAP Mankilam (Tagum 3) (Fire)

Purok Bautista, Brgy. Mankilan, Tagum City,

Davao del Norte

1 1

Projects Implemented

60NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

EHAP San Miguel (Tagum 3) (Fire)

Purok 13, Brgy. San Miguel, Tagum City,

Davao del Norte

1 1

EHAP Magugpo East (Tagum 4) (Fire)

Purok Mencidor, Brgy. Magugpo East,

Tagum City, Davao del Norte

1

EHAP San Isidro (Tagum 4) (Fire)

Purok Cabadiangan, Brgy, San Isidro,

Tagum City, Davao del Norte

1

EHAP Pagsabangan (Tagum 4) (Fire)

Purok Maduao, Brgy. Pagsabangan,

Tagum City, Davao del Norte

1

EHAP Manay (Fire)

Purok 7 Brgy. Central, Manay, Davao Oriental 8 8

EHAP Cabuyoan (Mabini) (Fire)

Brgy. Cabuyoan, Mabini, Davao de Oro 5 5

EHAP Kaligutan (Laak) (Fire)

Purok 4, Brgy. Sta. Emelia and Purok 5,

Brgy. Kaligutan, Laak, Davao de Oro

2 2

EHAP Baganga (Fire)

Purok Padada 1 Brgy. Central, Baganga,

Davao Oriental

14 14

EHAP Pangibiran (Mabini) (Fire)

Brgy. Pangibiran, Mabini, Davao de Oro 1 1

EHAP Banbanon (Laak 2) (Fire)

Purok 3, Brgy. Banbanon, Laak, Davao de Oro 1 1

EHAP Monkayo (Fire)

Purok 4A Mt. Diwata Monkayo, Davao de Oro 4 4

EHAP Mawab (Fire)

Purok 7, Brgy. Nueva Visayas, Mawab, Davao de Oro 1 1

EHAP Maco 1 (Fire)

Purok Mahayahay, Brgy. Langgam, Maco,

Davao de Oro

2 2

EHAP New Bataan 1 (Fire)

Purok 11, Brgy. Cabinuangan, New Bataan,

Davao de Oro, Davao de Oro

1 1

EHAP Mati (Fire)

Purok Gumamela, Brgy. Buso, Mati City,

Davao Oriental

5 5

EHAP New Bataan 2 (Fire)

Purok 3, Brgy. Batinao, New Bataan, Davao de Oro 1 1

Projects Implemented Projects Implemented

61 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

EHAP Maco 2 (Fire)

Purok 6, Brgy. Lapu-Lapu, Maco, Davao de Oro 2 2

EHAP Manay 2 (Fire)

Sitio Matabang, Brgy. Taocanga, Manay,

Davao Oriental

1 1

EHAP Naga (Laak 3) (Typhoon)

Purok 3, Brgy. Naga, Laak, Davao de Oro 1 1

EHAP Kilagding (Laak 4) (Landslide)

Purok 3, Brgy. Kilagding, Laak, Davao de Oro 1 1

EHAP Poblacion (Laak 5) (Fire)

Purok 1-A, Brgy. Poblacion, Laak, Davao de Oro 1 1

REGION XIII 479 479

FamiliesaffectedbyfireinPurok1and2at

Brgy. Mahogany, Butuan, Agusan del Norte

Brgy. Mahogany, Butuan, Agusan del Norte

40 40

FamiliesaffectedbyfireinPurok2and3at

Brgy. Poblacion, Magallanes, Agusan del Norte

Brgy. Poblacion, Magallanes, Agusan del Norte

10 10

FamiliesaffectedbyfireinPurok2Aat

Brgy. Taglatawan, Bayugan City, Agusan del Sur

Brgy. Taglatawan, Bayugan City, Agusan del Sur

48 48

FamiliesaffectedbyfireinDuranoSt.,Purok1,

Brgy. Diego Silang and Purok Ube, Brgy. Maon,

Butuan City, Agusan del Norte

Brgy. Diego Silang, Butuan City, Agusan del Norte;

Brgy. Maon, Butuan City, Agusan del Norte

8 8

FamiliesaffectedbyfireinPurok3,Brgy.Libertad,

Bunawan, Agusan del Sur

Brgy. Libertad, Bunawan, Agusan del Sur

3 3

Families Affected by Fire in Purok 7, 9, 11, Brgy.

Ong Yiu & Purok 4, Brgy. San Ignacio, Butuan City,

Agusan del Norte

Brgy. Ong Yiu, Butuan City, Agusan del Norte; Brgy.

San Ignacio, Butuan City, Agusan del Norte

289 289

Families Affected by Fire in Purok 4, Brgy. Obrero,

Butuan City, Agusan del Norte

Brgy. Obrero, Butuan City, Agusan del Norte

1 1

Families Affected by Fire in Purok 3, Brgy. 1, San

Francisco, Agusan del Sur

Brgy. 1, San Francisco, Agusan del Sur

9 9

Projects Implemented

62NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

PROGRAM/ REGION/PROJECT STARTS COMPLETIONS

Families Affected by Fire in District 3, Brgy. 3,

Nasipit, Agusan del Norte

Brgy. 3, Nasipit, Agusan del Norte

6 6

Families Affected by Fire in Brgy. Doongan, Butuan

City, Agusan del Norte

Brgy. Doongan, Butuan City, Agusan del Norte

10 10

Families Affected by Fire in Brgy. San Ignacio,

Butuan City, Agusan del Norte

Brgy. San Ignacio, Butuan City, Agusan del Norte

3 3

Families Affected by Fire in Brgy. Dumalagan,

Butuan City, Agusan del Norte

Brgy. Dumalagan, Butuan City, Agusan del Norte

2 2

Families Affected by Fire in Brgy. San Ignacio,

Butuan City, Agusan del Norte

Brgy. San Ignacio, Butuan City, Agusan del Norte

37 37

Families Affected by Fire in Purok 3B, Brgy.

Alubijid, Buenavista, Agusan del Norte

Brgy. Alubijid, Buenavista, Agusan del Norte

1 1

Families Affected by Fire in Purok 8, Brgy. San

Teodoro, Bunawan, Agusan del Sur

Brgy. San Teodoro, Bunawan, Agusan del Sur

1 1

Families Affected by Fire in Purok 7, Brgy. Ong Yiu,

Butuan City, Agusan del Norte

Brgy. Ong Yiu, Butuan City, Agusan del Norte

1 1

Families Affected by Fire in Brgy. Lemon, Butuan

City, Agusan del Norte

Brgy. Lemon, Butuan City, Agusan del Norte

8 8

Families Affected by Fire in Brgy. Tabon, Bislig City,

Surigao del Sur

Brgy. Tabon, Bislig City, Surigao del Sur

2 2

Projects Implemented Projects Implemented

63 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

SRs p e c i a l

r e p o r t

Special Report

64NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

HELP IS JUST AROUND THE CORNERIf there is a word to encapsulate the year 2020, it would be disaster. At the start of the year, we were startled by the sudden eruption of the Taal Volcano, then the COVID-19 pandemic came to change our lives in an instant, and to make our already worse situations even worse, Typhoons Rolly and Ulysses ravaged parts of the Bicol Region and Metro Manila.

The National Housing Authority for the year 2020 has never ceased to perform its mandate of helping beneficiaries, even if it proves to be disadvantageous. To address the economic struggles brought by the pandemic, General Manager Marcelino P. Escalada Jr., has suspended housing amortization payments twice in 2020: from March 16 to June 16, 2020, and from November 1 to December 31, 2020, in time for the Christmas season.

That Christmas season also saw how instant the Authority extended its help to the victims of Typhoon Ulysses. Financial assistance amounting to a total of P3,745,000 were given to 745 families in both Pasig and Marikina where the typhoon unleashed most of its damage aside from Christmas food packs on December 17, 2020. A day earlier on December 16, 78 families from Novaliches, Quezon City whose houses were destroyed by a week earlier by a fire were also recipients of financial assistance and food packs.

Meanwhile a total of P508 million pesos were allotted to those who were affected by Super typhoon Rolly in Region IV a month earlier in November 2020. This cash assistance program known as the Emergency Housing Assistance Program (EHAP) to victims of calamities is provided under NHA-Memorandum Circular No. 2019-28.

The EHAP as already mentioned provides a quick response cash assistance to qualified low- and marginal-income families affected by natural or man-made calamities for the purpose of augmenting their funds for the repair of their homes. Formerly the Housing and Materials Assistance (HOMA) Program, financial benefits are from P5,000 to P30,000 depending on the assessment or the level of damage to the beneficiary’s house-structures.

The cash assistance program was also instrumental in rebuilding the lives of the families of in Region XII. Back on October 16, 2019, a 6.3 magnitude earthquake shook the entire Soccsksargen province. In response to the disaster, the NHA Region XII immediately coordinated with affected LGUs in the Municipalities of Tulunan, M’Lang, Makilala, and Kidapawan City to procure the list of the affected families in order to provide them with financial assistance for the repair of their homes. A total of P2,940,000 were given to the beneficiaries affected.

The intention of the EHAP is an instant response to the needs of the affected families of calamities, either natural or man-made. Despite the program being somewhat of a footnote to NHA’s social services. It has undeniably helped its recipients restore their lives before the tragedies they have endured. It has been said that the Chinese use the same word to define crisis and opportunity. In a year full of disasters that was 2020, a little help could go a long way.

RSpecial Reports

NCR- East Sector (Pasig/Marikina) District Manager Engr. Jeane Dugenia led the distribution of Christmas gift packs, financial assistance will also be given under the NHA's Emergency Housing

Assistance Program to 690 families who were victims of the recent Typhoon Ulysses.

65 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

BDb o a r d o f

d i r e c t o r s

Board of Directors

66NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Sec. Eduardo Del Rosario was appointed as Chairman of the Department of Human Settlements (DHSUD) on July 12, 2017.

Prior to becoming DHSUD Chair, he was Undersecretary for Civil, Veterans and Retiree Affairs. His appointment as Undersecretary of the Department of National Defense was signed by the President of the Philippines on June 30, 2016.

He brought his significant experiences gained from serving as the General Officer-in-Charge of the Southern Luzon Command; Commander of the 2nd Infantry Division of the Philippine Army; Civil Relations Service; 803rd and 1003rd Infantry Brigades; Joint AFP Special Operations Group; Task Force Davao; Civil Affairs Group, Philippine Army; and the 73rd Infantry Battalion.

Sec. Del Rosario is also a retired Major General in the Armed Forces of the Philippines (AFP) having served the military for almost 37 years until his compulsory retirement in November 2012.

After graduating from the Philippine Military Academy in February 1980, Secretary del Rosario served in both field and staff duties and had undertaken professional and specialization courses in Scout Ranger Operations, Airborne, Field Artillery, Counter Terrorism, and Command General Staff Courses held locally and abroad. He likewise holds a Master’s Degree in Public Administration from the Philippine Christian University.

Marcelino P. Escalada, Jr., is the General Manager of the National Housing Authority, appointed by President Rodrigo Duterte. He has a Master’s Degree in Public Administration and is a Ph.D. candidate for Development Management. Prior to his appointment as NHA General Manager, he served as the Davao City Administrator in 2010 and headed in a concurrent capacity, the City Planning and Development Office, City Cooperative and Development Office and Special Projects until June 2016.

With his vast knowledge and experience in Public Administration, Development and Human Resource Management, Mr. Escalada spearheaded many strategic and innovative initiatives and under his leadership, the City government of Davao was hailed for “best” Human Resource (HR) practices. In November 2018, he was designated as Secretary General of the Housing and Urban Development Coordinating Council (HUDCC) while concurrently serving as NHA General Manager.

DHSUD SECRETARY

EDUARDO D. DEL ROSARIO

NHA GENERAL MANAGER

MARCELINO P.ESCALADA, JR.

Board of Directors

67 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Sec. Medialdea is the current Executive Secretary under the Office of the President and is serving as Board Member of the NHA.

He began his work in government in 1998 at the Livelihood Corporation (National Livelihood Development Corporation) upon the invitation of President Joseph Estrada. He became a member of the board of trustees and administrator of the government-owned corporation while also serving as chairman of the Guarantee Fund for Small and Medium Enterprises. In 2000, he was appointed by Estrada as a presidential assistant for political affairs.

Sec. Medialdea received his BS Commerce Major in Management from Colegio de San Juan de Letran in 1972 and his law degree from San Beda College of Law in 1976. He passed the bar exams the following year.

Sec. Chua became Acting Secretary of National Economic Development Authority on April 20, 2020. He was also Undersecretary for the Strategy, Economics, and Results Group in the Department of Finance. Prior to joining the government, Sec. Chua was the World Bank’s senior country economist for the Philippines. In this capacity, he advised the government on strategies and policies to attain more inclusive growth— the type that creates more and better jobs and reduces poverty.

Sec. Chua completed his MA in economics in 2003 and PhD in the same in 2011 at the University of the Philippines School of Economics. Prior to joining the World Bank, he was Assistant Professorial Lecturer of Mathematics and Economics at the Ateneo de Manila University where he also completed his BS in Management Engineering in 2000.

Sec. Chua was named one of the Ten Outstanding Young Men and Women (TOYM) in January 2019 by the Junior Chamber International (JCI) Philippines.

EXECUTIVE SECRETARY, OFFICE OF THE PRESIDENT

SALVADOR C.MEDIALDEA

NEDA SECRETARY

KARL KENDRICK T. CHUA

Board of Directors

68NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Sec. Villar currently serves as the Secretary for the Department of Public Works and Highways (DPWH) since August 1, 2016. Before accepting President Duterte’s appointment he was elected on his third term as a member of the House of Representatives.

As a legislator he authored several bills on education, health and livelihood, including the Negosyo Act promoting microfinance and the Lemon Law protecting buyers of motor vehicles. He was also one of the proponents of the Co-Loading Act which opened domestic transport and shipping to foreign vessels.

Sec. Villar obtained his bachelor’s degree in Economics, Political Science and Philosophy from the Wharton School of the University of Pennsylvania. He also finished his Master’s Degree in Business Administration f rom the Univers i ty of Chicago Booth School of Business.

Sec. Carlos “Sonny” Dominguez, 74, the current Secretary of Finance has over 40 years of experience managing various organizations in the public and private sectors. He was a shareholder, and board chairman or member of over a dozen corporations across various industries such as power, agriculture, mining, banking, hospitality, real estate and investment.

He held many notable positions namely: Cabinet Secretary of the Environment and Natural Resources and Agriculture under President Corazon Aquino’s Administration, and president of corporations such as the Philippine Airlines, the Philippine Associate Smelting and Refining Corporation (PASAR), and Bank of the Philippine Islands Agricultural Bank.

Sec. Dominguez has a Master’s Degree in Business Administration from Ateneo De Manila University and attended the Executive Management Program at the Stanford University.

DPWH SECRETARY

MARK A. VILLAR

SECRETARY OF FINANCE

CARLOS G. DOMINGUEZ

Board of Directors

69 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

Sec. Silvestre H. Bello, 75, lawyer, peace worker and human rights advocate, currently serves as Secretary of the Department of Labor and Employment. He has extensive experience in public service where recently he was a part of the 16th Congress representing 1BAP Partylist. Previously, he served as Secretary to the Cabinet from July 2008 to Feb 2010. He was Secretary for the Department of Justice twice under the Aquino (July 1990- February 1992) and Ramos Administration (January 1998-June 1998). He was also Solicitor General (September 1996-June 1998). He is a member of various boards and was a former board member of Philippine Airlines, Baguio Country Club, Philippine Plaza Hotel, and Urbank Bank to name a few. Sec. Bello is also affiliated with different Law Offices and is legal counsel to C. Alcantara & Sons Law Offices.

Sec. Bello has a degree in Politicial Science from Manuel L. Quezon University in 1961 and finished his Bachelor of Laws from Ateneo de Manila University.

Sec. Ramon M. Lopez, is the current Secretary of the Department of Trade & Industry. He also served as Chairman of the ASEAN Economic Ministers as the Philippines assumes chairmanship of ASEAN for 2017.

He has extensive experience in trade and industry, development planning and chairs important advisory boards and councils. His capacity as trade chief allowed him to be one of the APEC Ministers responsible for Trade and has been invited to be a part of the World Economic Forum and to be a founding member of the WEF-ASEAN Regional Strategy Group and Stewardship Board for International Trade and Investment System.

He also served as the Executive Director of the advocacy group Go Negosyo from October 2005 to June 2016. Sec. Lopez topped his Master’s in Development Economics at Williams College in Massachusetts, USA in 1988 and finished his AB Economics degree at the University of the Philippines School of Economics in 1981. He was recently recognized as one of the Outstanding Alumnus of the School.

DOLE SECRETARY

SILVESTRE H. BELLO III

DTI SECRETARY

RAMON M. LOPEZ

KBoard of Directors

70NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

KOk e y

o f f i c i a l s

Key Officials

71 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

MAIN OFFICE ADDRESS : ELLIPTICAL ROAD, DILIMAN, QUEZON CITY

TRUNKLINE : (02) 8790-0800 Local 0 to 109

NAME/OFFICE/POSITION/DESIGNATION ADDRESSCONTACT NOS. AND EMAIL

ADDRESSES

MR. MARCELINO P. ESCALADA, JR. General Manager

3rd Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 3018922-24608922-29878922-2058* 0918-8038331 [email protected]

ENGR. VICTOR C. BALBA Assistant General Manager

3rd Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 311 8926-52148921-2530* [email protected]@yahoo.com

STAFF DEPARTMENTS/UNITS    

ATTY. SERGIO D. DOMASIAN Officer-in-ChargeOfficeoftheCorporateSecretary(OCS)

2nd Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 270 8928-5231*[email protected]

ATTY. AVELINO D. TOLENTINO IIIDepartment Manager A Legal Department

Ground Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

[email protected][email protected]

MS. JOSEFINA M. BRUNO Officer-in-Charge Internal Audit Department (IAD)

2nd Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local [email protected]@gmail.com

ENGR. EDUARDO M. DORIA Division Manager A Procurement Planning and Management Division, OGM

2nd Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 263-2648928-8272/[email protected]@yahoo.com

MANAGEMENT SERVICES GROUP (MSG)

AR. MARISSA B. MANIQUIS Group Manager Management Services Group (MSG)

3rd Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 3208928-49610998-9687919 [email protected] [email protected]

MS. AGNES R. AGAY Department Manager A Corporate Planning Department (CPD)

3rd Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 320 [email protected]@yahoo.com

Key Officials

72NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

MR. ISAAC L. NACILLA Department Manager A Corporate Operations and Systems Development Department (COSDD)

3rd Flr., GSD/COSDD Bldg., NHA Compound., Elliptical Road, Diliman, Quezon City

8790-0800 local 551 and 611 [email protected]@gmail.com

MS. LOWELLA L. MANUEL

Department Manager A

Human Resource Management Department (HRMD)

2nd Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 250

8922-7767

[email protected]

[email protected]

ENGR. SUSAN E. NAVA Department Manager A General Services Department (GSD)

2nd Flr., GSD/COSDD Bldg., NHA Compound., Elliptical Road Diliman, Quezon City

8921-5977*[email protected][email protected]

FINANCIAL SERVICES GROUP (FSG)

MS. WILMA D. HERNANDEZ-MENDOZA Group Manager Financial Services Group (FSG)

3rd Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 330 8928-5255*0998-9687988 [email protected] [email protected]@yahoo.com

MR. RENATO Y. ALZONA Department Manager A Accounting Department

Mezzanine, NHA Main Bldg., Elliptical Road, Diliman Quezon City

8790-0800 local 150 8922-4637/[email protected]@yahoo.com

MS. PRUDENCIA B. GUGOL Department Manager A Financial Management Department (FMD)

3rd Flr., NHA Main Bldg., Elliptical Road Diliman, Quezon City

8928-5255* 8790-0800 local 3300998-9687986 [email protected]

MS. FE P. VALENZUELA Department Manager A Treasury Department

Mezzanine, NHA Main Bldg., Elliptical Road, Diliman Quezon City

8790-0800 local 190 8928-8108 8921-7830*0998-9687920 [email protected]@gmail.com

HOUSING SUPPORT SERVICES GROUP (HSSG)

ATTY. MARIA MAGDALENA DE LEON-SIACON Acting Group ManagerHousing Support Services Group (HSSG)

3rd Flr., HTREX Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 423 8929-5850* [email protected]

MS. SYLVIA L. BRIONES Department Manager A Community Support Services Department (CSSD)

Mezzanine, NHA Main Bldg., Elliptical Road, Diliman Quezon City

8923-0405* 8790-0800 local [email protected]@gmail.com

Key Officials

73 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

MS. CHRISTINE P. FIRMALINO Acting Department Manager A Resettlement and Development Services Department (RDSD)

Ground Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 110 8926-58190998-9687911 [email protected]@yahoo.com

MS. ANA V. BAUL Department Manager A Estate Management Department (EMD)

Mezzanine, NHA Main Bldg., Elliptical Road, Diliman Quezon City

926-5820* 8790-0800 local 1800998-9687901 [email protected] [email protected]

MS. EUTEMIA B. ONTINA Department Manager A Commercial and Industrial Estates Department (CIED)

2nd Flr., NHA Main Bldg., Elliptical Rd Diliman, Quezon City

8790-0800 local 221 8922-3002*0998-9687967 [email protected][email protected]

ENGR. JOVITA G. PANOPIO Department Manager A Housing Technology and Technical Research Department (HTTRD)

3rd Flr., HTREX Bldg., NHA Compound, Elliptical Road, Diliman, Quezon City

8790-0800 local 423 8929-5850*0998-9687971 [email protected] [email protected]

ENGR. WUNIBALD J. VIAÑA Department Manager AProject Operations Support Services Department (POSSD)

Ground Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local [email protected][email protected]

REGIONAL OFFICES

NCR EAST SECTOR

ENGR. MELIZA S. BENEDITO Regional Manager NCREastSectorOffice

Ground Flr., NHA Main Bldg., Elliptical Road, Diliman, Quezon City

8790-0800 local 132 8243-8344*[email protected] [email protected]

ENGR. MAE A. VICENTE Acting District Manager QuezonCityDistrictOffice

NHA Compound, Elliptical Road Diliman, Quezon City

8790-0800 local 4130998-9687993 [email protected] [email protected] [email protected]

ENGR. JEANE S. DUGENIAActing District Manager Pasig/Marikina/ManggahanDistrictOffice

Manggahan Floodway, Barangay Sta. Lucia BLISS, Pasig City

8656-8114 8645-5912 8656-81660947-9929560 [email protected]@yahoo.com

Key Officials

74NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

NCR NORTH SECTOR

ENGR. ALBERT A. PERFECTO Regional Manager NCRNorthSectorOffice

NHA Compound., Elliptical Road, Diliman, Quezon City

ENGR. JUANCHO M. CORPUZ District Manager Malabon/Navotas/ValenzuelaDistrictOffice

Bangus Ave cor. Apahap St., Dagat-dagatan, Navotas City

8282-6427 8282-6426*0998-8416079 [email protected] [email protected]

ENGR. MAURA D. AGGARAO Acting District Manager CaloocanDistrictOffice

Bagong Silang Resettlement Project Ph 1 Package 1 Area 1 Bagong Silang, Caloocan City

7506-69410919-0662685 [email protected]@yahoo.com

NCR WEST SECTOR

MS. LUZ U. EVANGELISTA Regional Manager NCRWestSectorOffice

5thflr.,J&TBldg. 3894 Ramon Magsaysay Blvd., Barangay 58, Zone 058 Sta. Mesa,Manila

8244-83250998-9687930 [email protected] [email protected] [email protected]

AR. DANIEL R. COCJIN Officer-in-Charge ManilaDistrictOffice

Masinop cor. Quezon Sts., Tondo, Manila

8254-5527* [email protected]@gmail.com

ENGR. RODRIGO P. ROCILLOActing District ManagerSanJuan/MandaluyongDistrictOffice

4745 Peralta St., Barangay 599 Sta. Mesa, Manila

8716-7582 8716-2433*[email protected]

NCR SOUTH SECTOR

ENGR. ARACELI B. NATINO Regional ManagerNCRSouthSectorOffice

Room No. 202, Diplomat Bldg., St Andrew Ave., Maricaban, Pasay City

8846-78448846-88298804-0519*[email protected]

[email protected]

ENGR. ARNOLD BENJAMIN P. GASCON District Manager Pasay/Paranaque/LasPiñasDistrictOffice

Room No. 202, Diplomat Bldg., St Andrew Ave., Maricaban Pasay City

8846-78448846-88298804-0519*[email protected]@yahoo.com

ENGR. ROMMEL R. TRINIDAD District Manager Muntinlupa/Taguig/Pateros/Makati City DistrictOffice

Mindanao Ave., Maharlika Village, Western Bicutan, Taguig City

8838-4182 8837-1227*0998-9687982 [email protected]

Key Officials

75 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

REGION I & CAR 1

AR. ELIZABETH F. JOSEPH Officer-in-Charge RegionI&CAR1Office Concurrent District ManagerMt. Province/Benguet/Pangasinan District Office

4/F DBP Bldg., Lower Session Rd., Baguio City, Benguet

(074) 309-55880998-9687981 [email protected] [email protected]

ENGR. JEFFERSON F. GANADOOfficer-in-ChargeAbra/La Union/Ilocos Norte/Ilocos Sur DistrictOffice

Candon Trade Center Bldg., Tablac, Candon, Ilocos Sur

(074) 442-1778(007) [email protected]

REGION II & CAR 2

ENGR. FERDINAND C. SALES Officer-in-Charge RegionII&CARIIOffice

Concurrent District Manager Ifugao/Nueva Viscaya/Quirino/Isabela District Office

24 Dalan na Pappabalo St cor. Mantunung, Regional Govt. Center (RGC) Carig Sur, Tuguegarao City, Cagayan

(078) 844-4787 [email protected]@gmail.com

[email protected]

ENGR. JOCELYN S. SUNICO District Manager Cagayan/Apayao/Kalinga/Batanes District Office

24 Dalan na Pappabalo St cor. Mantunung, Regional Govt. Center (RGC) Carig Sur, Tuguegarao City, Cagayan

(078) [email protected][email protected]

REGION III

MR. RODERICK T. IBAÑEZ Regional Manager RegionIIIOffice

NHA Compound, Elliptical Rd, Diliman, Quezon City

McArthur Hiway, Barangay Maimpis, San Fernando City, Pampanga

8922-33250998-9687932 (045) 963-0153 (045) 860-3952 [email protected] [email protected]

AR. GRACE A. KEKENUSA Officer-in-Charge Pampanga/Bataan/ZambalesDistrictOffice

Block 69 Admin Bldg., EPZA Resettlement Project., Barangay Pulung Cacutud, Angeles City, Pampanga

(045) 893-10630919-0673084 [email protected]@[email protected]

AR. MA. FATIMA T. DELA CRUZOfficer-in-ChargeTarlac/NuevaEcija/AuroraDistrictOffice

Barangay Burot, Tarlac City, Tarlac

[email protected][email protected]

MS. ELIZABETH E. AGUILAR Office-in-Charge BulacanDistrictOffice

Pabahay 2000, Barangay Muzon, San Jose Del Monte City, Bulacan

0921-4701951 [email protected]

Key Officials

76NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

REGION IV

ENGR. ROMUEL P. ALIMBOYAO Regional Manager RegionIVOffice

NHA Compound., Elliptical Rd Diliman, Quezon City

8922-3319 8922-9820*0998-9687933 [email protected][email protected]

ENGR. RAYMUND N. ABAD District Manager LagunaDistrictOffice

Southville 1-Cabuyao, Barangay Marinig, Niugan, Cabuyao City, Laguna

0998-9687944 [email protected] [email protected]

ENGR. ALPH L. ORTICIO District Manager CaviteDistrictOffice

Barangay Poblacion 1, San Pedro, Gen. Mariano Alvarez, Cavite

(046) 506-03220998-9687946 [email protected]@gmail.com

ENGR. MARIA BELINDA V. SEVALLADistrict ManagerBatangas/QuezonDistrictOffice

Ground Flr., Old Lucena City Hall Bldg., M.L. Tagarao St., Barangay 5, Lucena City, Quezon

Lipa City Hall Compound, Barangay Marawoy, Lipa City, Batangas

[email protected]@yahoo.com

MS. PAULINA EVELIA D. JOSON Officer-in-Charge Mindoro/Marinduque/Romblon/Palawan DistrictOffice

Blk 5 Lot 7, Gov’t Center & Nature’s Park, Barangay Sta. Monica, Puerto Princesa City, Palawan

(048) 433-2636 (048) 434-4031*[email protected][email protected]

ENGR. LORENZO D. PINEDA District Manager RizalDistrictOffice

NHA Ave., Barangay Dela Paz, Bagong Nayon II, Antipolo City

8637-2468 8795-5424 8261-10660949-9929472 [email protected]@yahoo.com

REGION V

AR. MARIA TERESA P. OBLIPIAS Regional Manager RegionVOffice

Block 1 Maharlika Highway, Villa Grande Homes, Concepcion Grande, Naga City, Camarines Sur

(054) 472-3257 (054) 473-6552*(054) 884-54230998-9687980 [email protected]@yahoo.com

ENGR. TEODORA G. BANDOJO District Manager Albay/CatanduanesDistrictOffice

Disaster Preparedness Center Bldg., Mayon Vista Barangay Tuburan, Ligao City, Albay

(054) [email protected] [email protected]

ENGR. CRISTINA A. CABANGON District Manager Camarines Sur/Camarines Norte District Office

MRH Site, Block 1, Villa Grande Homes, Concepcion Grande, Naga City, Camarines Sur

(054) 88154230920-9815405 [email protected][email protected]

ENGR. MANUEL B. SALVADORA District Manager Sorsogon/MasbateDistrictOffice

City Employees Village, Cabid-an, Sorsogon City, Sorsogon

(056) 578-59030998-9687957 [email protected]@gmail.com

Key Officials

77 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

REGION VI

ENGR. ANTONIO P. DEL ROSARIO Acting Regional Manager RegionVIOffice

2nd Flr., S&T Bldg., 45 Rizal St., Barangay Rima, Iloilo

(033) 314-75030998-9687914 [email protected]

ENGR. ALEJANDRO M. ONGSUCO District Manager NegrosOccidentalDistrictOffice

Phase 2, Block 2, Lot 98 Pahanocoy Sites and Services Project, Barangay Pahanocoy, Bacolod City

(034) 445-5220 0998-9687948 [email protected]@yahoo.com

ENGR. DOMINICA D. SAN DIEGO District Manager Capiz/Aklan/AntiqueDistrictOffice

Barangay Bakhaw, Mandurriao, Iloilo City, Iloilo

(033) [email protected]@yahoo.com

MS. FE T. JAMOYOT Officer-in-Charge Iloilo/GuimarasDistrictOffice

Barangay Bakhaw, Mandurriao, Iloilo City, Iloilo

(033) 321-6242(033) 503-61410998-8556295 [email protected]@yahoo.com

REGION VII

ENGR. HERMES JUDE G. JUNTILO Officer-in-Charge RegionVIIOffice

2nd Flr., Machay Bldg., Gorordo Ave., Cebu City

(032) 232-9048 (032) 232-90530923-4519149 [email protected]@gmail.com

Concurrent District ManagerCebuDistrictOffice

[email protected]

NegrosOriental/SiquijorDistrictOffice 2nd Flr., Florjacinto Bldg., Cervantes St., Dumaguete City

[email protected]

MS. GRACE B. SOLISDistrict ManagerBoholDistrictOffice

0156 Benigno Aquino Jr. Ave., Cogon District, Tagbilaran City

(038) 4273587

[email protected]

REGION VIII

ENGR. CONSTANCIO G. ANTINIERO Regional Manager RegionVIIIOffice

Leyte1,2,3/BiliranDistrictOffice

Samar1/NorthernSamarDistrictOffice

Kandungganan Village Project, Calanipawan Road, Sangkahan District, Tacloban City, Leyte

(053) 432-4085 (053) 530-76310998-9689665 [email protected]@yahoo.com

[email protected]

[email protected]

MS. MARILYN C. LAUZON District ManagerLeyte4,5/SouthernLeyteDistrictOffice

Kandungganan Village Project, Calanipawan Road, Sangkahan District, Tacloban City, Leyte

(053) [email protected]

Key Officials

78NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

AR. ISIDRO G. DELUTE, JR. Officer-in-Charge Samar2/SouthernSamarDistrictOffice

Kandungganan Village Project, Calanipawan Road, Sangkahan District, Tacloban City, Leyte

(053) 432-4085 (053) 530-7631 [email protected]@gmail.com

REGION IX

ENGR. CLEMENTE A. DAYOT Acting Regional Manager RegionIXOffice

Head MarawiProjectManagementOffice

Bajamunde Compound, Roxas St., Sta. Maria District Pagadian City, Zamboanga Del Sur

2nd Flr. MMA Bldg. Cenauri Subd., Camague Hi-way, Iligan City

(062) 925-1384*0998-9689663 [email protected]@gmail.com

(063) 224-8762

ENGR. AL-KHWARIZMI U. INDANAN District Manager Zamboanga City/Zamboanga Sibugay/ARMM B (Basulta-Basilan/Sulu/ Tawi-Tawi) District Office

3rd Flr., Weelekin Bldg., Veterans Ave., Zamboanga City, Zamboanga Del Sur

(062) 955-5291 (062) 922-55160998-9687918 [email protected]

ENGR. ALFONSO L. BORLAGDAN District Manager Zamboanga Del Sur/Zamboanga Del Norte/ ARMM A (Maguindanao/Lanao Del Sur) DistrictOffice

Bajamunde Compound, Roxas St. Sta Maria District Pagadian City, Zamboanga Del Sur

(062) 925-1384*0998-9687952 [email protected]

REGION X

ENGR. ROLANDO I. TEVES, JR. Regional Manager RegionXOffice

Don Julio Pacana St., Puntod, Macabalan, Cagayan De Oro City, Misamis Oriental

(088) 856-8778* (088) 856-87650998-9687959 [email protected][email protected]

ENGR. FE P. ANCHETA District Manager Cagayan De Oro/Misamis Oriental/Camiguin DistrictOffice

Don Julio Pacana St., Puntod, Macabalan, Cagayan De Oro City, Misamis Oriental

(088) 856-8778* (088) 856-87650998-9687955 [email protected] [email protected]

ENGR. MADELEINE GILDA S. ABELLERA District ManagerBukidnon/Misamis Occidental/Lanao Del NorteDistrictOffice

Don Julio Pacana St., Puntod, Macabalan, Cagayan De Oro City, Misamis Oriental

(088) 856-8778* (088) 856-87650998-5841816 [email protected]@[email protected]

Key Officials

79 NATIONAL HOUSING AUTHORITY ANNUAL REPORT 2020

REGION XI

ENGR. ZENAIDA M. CABILES Regional Manager RegionXIOffice

2nd Floor Alfresco Area, Felcris Centrale, Quimpo Blvd., Davao City

(082) 221-0832* (082) 226-20020998-9687961 [email protected]@yahoo.com

ENGR. OSCAR A. SAYMAN

Officer-in-Charge

Davao City/Digos City/IS Garden of Samal/DavaoDelSur/DavaoDelNorteDistrictOffice

2nd Floor Alfresco Area, Felcris Centrale, Quimpo Blvd., Davao City

(082) 221-0832*

(082) 226-2002

[email protected]

ENGR. SONIA J. BULSECO District ManagerDavao Oriental/Compostela Valley District Office

Consuelo Business Center (CBC), Pioneer Ave., Tagum City, Davao Del Norte

[email protected] [email protected]

REGION XII

ENGR. ERASME G. MADLOS Regional Manager RegionXIIOffice

2nd Flr., JYSL Bldg., Arellano cor. Balmores Sts., Koronadal City, South Cotabato

(083) 288-86500998-9687963 [email protected] [email protected]

ENGR. JOEL R. REINTAR Officer-in-Charge Sultan Kudarat/ Tacurong City/Kidapawan/ CotabatoCity/CotabatoDistrictOffice

NHA Bldg., APO Sandawa Homes Phase 3 Singco Road, Poblacion, Kidapawan City

(083) 520-2478 * (083) 288-1694nha12kidapawandistrict [email protected]@yahoo.com

ENGR. RIZALINO G. CABAHUG District Manager General Santos City/Koronadal/South Cotabato/SaranganiDistrictOffice

Ground Flr., Avior Building, Santiago Blvd., General Santos City

(083) [email protected][email protected]

REGION XIII

ENGR. ELLEN B. WALSH Officer-in-Charge RegionXIIIOffice

Concurrent District ManagerButuanCity/AgusanDelSurDistrictOffice

Helen Tiu Bldg., Pizarro St., Butuan City, Agusan Del Norte

(085) 342-5279* (085) 553-26080946-7000235/[email protected][email protected]

ENGR. CECELLE M. LAROGAOfficer-in-ChargeSurigao City/Surigao North/Surigao Del Sur/DinagatProvinceDistrictOffice

Helen Tiu Bldg., Pizarro St., Butuan City, Agusan Del Norte

(085) 342-5279* (085) 815-12010948-4690514/[email protected]

Key OfficialsKey Officials

Key Officials

NATIONAL HOUSING AUTHORITY

(8)790-0800

@officialNHA

nha.gov.ph