Annual Report 2019-20 - Power & Electricity Department

28
ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM 1 Vision : To attain and become the most trusted integrated Utility/ Department through better Customer satisfaction, optimum utilization of energy and to fulfill the expectations of all stakeholders in a manner that is safe, ethical, healthy and environment friendly. Mission : 1) To deliver dependable, reliable and quality power supply and services at affordable and competitive price for every section of the society in the State. 2) To set new benchmarks in Standard of Performance and governance with profitable growth. 3) To continuously improve the quality and reliability of service towards the consumers. 4) To offer goods and services and find solutions for the major stakeholders across the entire state. VISION & MISSION of Power & Electricity Department Engineer-in-Chief, Power & Electricity Department Kawlphetha Building, MINECO, Khatla, Aizawl - 796001. Mizoram Phone : 0389 – 2336848, 2336862 (Fax) . CONTACT ADDRESS

Transcript of Annual Report 2019-20 - Power & Electricity Department

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

1

Vision:

To attain and become the most trusted integrated Utility/Department through better Customer satisfaction, optimum utilizationof energy and to fulfill the expectations of all stakeholders in a mannerthat is safe, ethical, healthy and environment friendly.

Mission:

1) To deliver dependable, reliable and quality power supply andservices at affordable and competitive price for every sectionof the society in the State.

2) To set new benchmarks in Standard of Performance andgovernance with profitable growth.

3) To continuously improve the quality and reliability of servicetowards the consumers.

4) To offer goods and services and find solutions for the majorstakeholders across the entire state.

VISION & MISSION of

Power & Electricity Department

Engineer-in-Chief, Power & Electricity Department

Kawlphetha Building, MINECO, Khatla, Aizawl - 796001. Mizoram

Phone : 0389 – 2336848, 2336862 (Fax)

.

CONTACT ADDRESS

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

2

INTRODUCTION

Electricity was generated for the first time in Aizawl in December 1962 using

a 75 kW DG set. The State’s generation capacity was 145 kW prior to the formation

of Union Territory in 1972.Power & Electricity Department became a full-fledged

Department in 1983 headed by a Chief Engineer and subsequently in 2008,the post

of Engineer-in-Chief was created to head the Department.

The Department is now functioning as an integrated utility unit for generation,

transmission and distribution of power within the state of Mizoram. The Department

is also responsible for maintenance of power distribution network to cater quality

power supply to its consumers. The administrative head of the Department is the

Secretary(Power) to the Govt. of Mizoram whereas the Engineer-in-Chief is the

head of the Department in running its affairs. The Engineer-in Chief is assisted by

Chief Engineer(RE) and Chief Engineer(Civil) in his office, 2(two) field Chief

Engineers supported by 19(nineteen) Superintending Engineers in 9(nine) working

Circles, 21(twenty one) Executive Engineers and 52 (fifty-two) Sub-Divisional

Officers and associated staff working round the clock to ensure 24x7 power supply

to the 259961 consumers.

The Department also has given priority for generation of power from the

State’s available huge potential and shifted the headquarters of the Executive Engineer,

Serlui’B’Project Division and its associated Sub-Divisions to Ngopa and renamed

as the Executive Engineer, Hydel Division and 2(two) Sub-Divisions execute

construction of Kawlbem Small Hydro Project(2x2 MW).

The State’s requirement of power is 201MW (as per 18th Electric Power

Survey) whereas the allocated share is 152.89 MW against a Peak demand of 110MW.

This is excluding State owned Hydel Stations (29.35MW) and Tuirial HEP (60MW)

which was not reflected in e-Book 2019-20.

The State is dependent on the outside sources for its energy requirement and

mainly through Central Sector Generating Stations (CSGS) from North Eastern

Power Corporation Limited (NEEPCO), National Hydroelectric Power Corporation

Limited (NHPC), National Thermal Power Corporation Limited (NTPC), ONGC

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

3

Tripura Power Company Limited (ONGC) and a combined project from Baramura

IV&V (Tripura, Manipur & Mizoram). The daily drawal power requirement of 24

hrs in 15 minutes block based on actual demand of State is sent daily by State Load

Dispatch Centre (SLDC), Mizoram to North Eastern Regional Load Dispatch Centre

(NERLDC), Shillong.

The Department looks after the following assets as on 31st March, 2020 and

are listed below:-

1. Hydel Generating Stations(SHP) - 11 Nos. (29.35 MW)

2. 132 kV lines - 760.30 Km

3. 66 kV lines - 111.42 Km

4. 33 kV lines - 1483.42Km

5. 11 kV lines - 5613.15Km

6. LT lines - 3319.07 Km

7. 11kV ABC - 12.61 Km

8. LT ABC Lines - 127.97 Km

9. 132 kV Grid Sub-Station - 11 Nos. (283 MVA)

10. 33 kV Grid Sub-Station - 62 Nos. (270 MVA)

11. Distribution Transformers - 2701 Nos. (315.35 MVA)

12. Buildings

a) Office Buildings - 37 Nos

b) Residential Buildings - 417 Nos

c) Total Buildings - 454 Nos

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

4

ORGANISATION SET UP

Power & Electricity Department under Government of Mizoram has been established

in 1979 initially headed by Superintending Engineer under whom there were four (4) Divisions

and Thirteen (13) Sub-Divisions. The present organization set up with detail of posts-Gazetted,

Non-Gazetted and Work Charged are as follows :-

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

5

ZEDA (Zuangtui, Aizawl)

Director, PD, PO-2nos

SLDC

Division(P/H Complex, .

Aizawl)

EE (E)-1no,

AE (E)-3nos

SLDC CRICLE

(P/H Complex, Electric Veng. Aizawl)

SE (E)-1no, EE(E)-1no, AE(E)-1no

E-in-C (E)

EO to E-in-C

Steno (Grade-1)

AE (E)

CE(RE) (E)

SE (Works-I) (E)

EE (Works-I)

AE (E)-2nos

SE (Works-II) (E)

EE (Works-II)

AE (E) – IT Cell

EE(D&M)

AE (E)-2nos

SE(PDM) (E)

EE(P)

AE (E)

SE(COM) (E)

EE(COM)

AE (E)-2nos

CE(Civil) (C)

SE-I (C)

EE (C)

SE-II (C)

AE (C)

SE-III (C)

AE (C)

Dy Director (Admn.)

Superintendent

Jt. Director (Acct)

AA&AO – 2nos

OFFICE OF ENGINEER-IN-CHIEF(Kawlphetha Building, MINECO, Khatla, Aizawl – 796001)

MRT

S/D

Aizawl

Power

Store

S/D

Aizawl

MRT

S/D

Lunglei

MRT Division

(Tuivamit, Aizawl)

EE (E)-1no

Commissioner & Secretary

Jt. Secretary (Tech)

Dy. Secretary

Under Secretary (Tech)

Uder Secretary, SupDt.-2nos

P&E SECRETARIAT(MINECO, Khatla, Aizawl – 796001)

Chief Engineer (E)

Superintending Engineer (P)

Executive Engineer (P)

EO to CE(D)

Dy Director (Admn)

Assistant Engineer – 3nos

Supdt. – 1no, FAO – 1no

CHIEF ENGINEER (D)(Kawlphetha Bldg, MINECO, Khatla)

TRANS-

MISSION

CIRCLE(Kawlphetha

Bldg. MINECO, Khatla)

SE(E) – 1no

EE(E) – 1no,

AE(E) – 1no

Serchhip Power S/D

E.Lungdar Power S/D

Sub-Station S/D,

Serchhip

SerChhip

Power Div.

EE (E),

SDO(TC)

Thingsulthliah Power S/D

Saitual Power S/D

Darlawn Power S/D,

Construction

Div. Aizawl

EE (E),

SDO(TC)

Maicham Hydel Proj.

S/D-I

Maicham Hydel Proj.

S/D-II

Maicham

Proj. Div,

N.Vanlaiphai

EE (C), SDO

(TC)

Kolasib Power S/D,

Kawnpui Power S/D,

Vairengte Power

S/D,

Trans & Switchyard

S/D, Bairabi

Kolasib

Power

Division

EE (E), SDO

(TC)

Mamit Power S/D

W.Phaileng Power S/D

Zawlnuam Power S/D

Mamit Power

Division

EE (E)

Champhai Power Sub-

Division

Roral S/D, Champhai

Power Proj.

Div,

Champhai

EE (E)

Khawzawl Power Sub-

Division

Ngopa Power S/D

Khawzawl

Power Div.

EE (E)

CHAMPHAI

POWER

CIRCLE(Electric Veng,

Champhai)

SE(E) – 1no

EE(E) – 1no,

AE(E) – 1no

Asst. Electrical Inspector

Electrical Inspector

SDO (TC)

Chief Electrical Inspector

Zuangtui, Aizawl

Building S/D

Bilkhawthlir

Serlui B

Project S/D

PROJECT

CRICLE-II

(Kawlphetha

Bldg., MINECO)

SE (C),

EE(C),

AE(C)-2nos

Proj. Constn

S/D-I

S.Khawbung

Proj. Constn

S/D-II

S.Khawbung

Proj. Constn S/

D-III S.Khawbung

Proj.

Constn Div.

S.Khaw-

Bung

EE (C)

AE(C)

Civil Proj. S/D

Aizawl

Civil Proj.

S/D Lunglei

Civil Proj

Div, Aizawl

EE(C),

SDO(TC)

Hydel S/D-I,

Kawlbem

Hydel S/D-II,

Ngopa

Hydel

Division,

Ngopa

EE(C),

SDO(TC)

AIZAWL

POWER

CIRCLE(P/H Cplx,

Electric Veng,

Aizawl)

SE(E) – 1no

EE(E) – 1no,

AE(E) – 1no

LUNGLEI

POWER

CIRCLE(P/H Cplx,

Electric Veng,

Lunglei)

SE(E) – 1no

EE(E) – 1no,

AE(E) – 1no

Chief Engineer (E)

Superintending Engineer (P)

Executive Engineer (P)

EO to CE(SO)

Dy Director (Admn)

Assistant Engineer – 3nos

Supdt. – 1no, FAO – 1no

CHIEF ENGINEER (SO)(P/H Complex, Electic Veng, Aizawl)

Revenue S/D-I,

Ramhlun North

Distribution S/D-II,

P/H Complex, Aizawl

Distribution S/D-III,

P/H Complex, Aizawl

Distribution

Div. P/H

Complex,

Aizawl

EE (E),

SDO(TC)

Zuangtui Sub-Station

S/D. Aizawl

Generation S/D,

Kulikawn, Aizawl

Luangmual Sub-

Station S/D. Aizawl

Generation

Div., P/H

Complex,

Aizawl

EE (E),

SDO(TC)

Distribution S/D-I,

Mission Veng, Aizawl

Revenue S/D-II, P/H

Luangmual, Aizawl

Revenue S/D-III,

Republic Veng, Aizawl

Rural S/D, P/H

Complex, Aizawl

Revenue

Div., P/H

Complex,

Aizawl

EE (E),

SDO(TC)

Revenue S/D,

Lunglei

Distribution S/D,

Lunglei

Sub-Station S/D, Lunglei

Mualthuam Power

S/D,

Power

Maintenance

Division-I,

Lunglei

EE (E)

Hnahthial Power S/D

Lungsen Power S/D

Rural S/D, Lunglei

Power

Maintenance

Division-II,

Lunglei

EE (E),

SDO(TC)

Lawngtlai Power

SUb-Division

S.Bungtlang Power

SUb-Division

Lawngtlai

POwer

Division

EE (E)

Siaha Power S/D

Tuipang Power S/D

Siaha Power

Division

EE (E)

PROJECT

CIRCLE-I(P/H Cplx,

Electric Veng,

Aizawl)

SE(E) – 1no,

EE(E) – 1no,

AE(E) – 1no,

AE(C)-1no

Thermal

Proj. Div.,

Bilkhawthlir

EE(C),

SDO(TC)

ORGANIZATION CHART OF POWER & ELECTRICITY DEPARTMENT, MIZORAM

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

6

POWER SOURCES FOR MIZORAM

A. CENTRAL GENERATING STATIONS

Mizoram power generation is not sufficient to meet her needs and

the State’s power deficit is supplemented from various Central Sector

Generating Stations. Table below shows the percentage and MW sharing

of Mizoram from Central Generating Stations as on April 2020 :-

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

7

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

8

B. STATE OWN GENERATION

Mizoram has 11 nos Hydel Generation Stations with installed capacity

of 29.35MW and these stations generate arround 40MU annually. Table

below shows the Generating Station in Mizoram with their installed

capacity.

PHOTO : Serlui B HEP (12MW)

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

9

POWER DEMAND & LOCAL GENERATION OF MIZORAM

Table below shows the peak and off-peak demand and power drawal during 2019-20.

TABLE : Abstract of Local Generation during 2019-20

Mizoram generates 51.118 MU of energy during 2019-20 from its owned Generating

Stations which is 27% higher than the previous year. Table below shows the total monthly

local generation of electricity in Mizoram during 2019-20.

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

10

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

11

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

12

POWER PURCHASE

Mizoram has purchased about 95% of her total power requirement from different

generating stations. During 2019-20 the total power purchase bill to be borne by Mizoram

is Rs 329.87 crore. Monthly power purchase cost from all Central Generating Stations

including transmission charges, etc. is shown in the table below:-

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

13

ABSTRACT OF ENERGY ACCOUNTING DURING 2019-20

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

14

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

15

STATISTICS OF LINES

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

16

DETAILS OF 132kV LINES IN MIZORAM

17

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

18

132kV POWER SUB-STATIONS IN MIZORAM

New 2x25MVA,

132/33kV

Sub-Station

Zuangtui

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

19

33kV SUB-STATIONS IN MIZORAM

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

20

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

21

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

22

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

23

LIST OF DEPARTMENTAL BUILDINGS

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

24

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

25

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

26

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

27

ANNUAL REPORT 2019-20 : POWER & ELECTRICITY DEPARTMENT, MIZORAM

28