Annexures - CAG
-
Upload
khangminh22 -
Category
Documents
-
view
1 -
download
0
Transcript of Annexures - CAG
Report No. 4 of 2022
73
Annexure 1: Process flowchart entailing the main steps involved in the CRZ Project approval
(Reference: Introduction, Chapter 3 of the report)
Performance Audit Report on Conservation of Coastal Ecosystems
74
Annexure 2: Employment of non-accredited consultant/ non- accreditation of the consultant in a particular category of the project
(Reference: Para 3.1 (i) of the report)
S. No. Project Project approval by MoEF&CC
Consultant for EIA
1. Laying of Natural Gas pipeline by Mahanagar Gas Ltd, Maharashtra
2018 The consultant JV Analytical Services, Pune not accredited for Pipeline Sector.
2. Construction of Hotel Building in Mangalore, Dakshina Kannada District by M/s. Motimahal Hotels Pvt. Ltd., Karnataka
2017 The Environment Management Plan and the DMP which formed a part of the EIA was proposed by the PP itself and an accredited consultant was not appointed.
3. Expansion of port facilities by Redi Port Ltd in Maharashtra
2018 The consultant engaged was not accredited in the areas of Air Pollution, Prevention, Monitoring and Control, Hazardous Waste Management, Ecology and Biodiversity.
4. Construction of Petroleum Products Storage Terminal at Karwar, Karnataka Port by M/s Tropicana Liquid Storage (P) Ltd. , Karnataka
2015 The Environment Management Plan was prepared by Marine Science Research Institute, Karwar, which was not an accredited consultant organisation.
5. Establishment of intake and outfall facility for Nuclear Power Plant at Mithivirdi, District Bhavnagar, Gujarat by M/s Nuclear Power Corporation of India Limited, Gujarat
2015 M/s Engineers India Limited, appointed as a consultant for this project was not accredited by NABET for “Nuclear Power and processing of fuel” sector.
6. Development of the petroleum, chemical and petrochemical investment region (PCPIR) at Dahej, Vagra, District Bharuch by M/s Gujarat Industrial Development Corporation Gujarat
2015 The consultant, NEERI, Nagpur was not accredited under by National Accreditation Board of Education and Training/ Quality Council of India.
7. Mumbai Trans Harbor Sea Link by M/s Mumbai Metropolitan Region Development Authority, Maharashtra
2016 A consortium of Arup, Consulting Engineers and KPMG had been appointed as consultants for this project. However, the NABET Accreditation certificate annexed in the records pertaining to M/s Consulting Engineers Services Pvt. Ltd and the same was not accredited for sea link construction sector.
8. Laying of an effluent pipeline by Madhu Silica Pvt. Ltd. (MSPL) in Bhavnagar, Gujarat
2015 Consultant M/s Indomer Coastal Hydraulics (P) Ltd., Chennai was not accredited by National Accreditation Board of Education and Training/ Quality Council of India
9. Widening and improvement of the existing highway of Bhavnagar- Pipavav- Porbandar-Dwarka Section of NH-8E, Gujarat
2016 The consultant M/s STUP Consultant Pvt. Ltd., Kolkata was not accredited by National Accreditation Board of Education and Training/ Quality Council of India
Report No. 4 of 2022
75
S. No. Project Project approval by MoEF&CC
Consultant for EIA
10. Additional Salt works (2846.15 acres) located at village Kalatalav & Narmad, Taluka & Dist. Bhavnagar
Accorded clearance by SEIAA in 2017
The consultant National Institute of Oceanography-CSIR was not accredited by National Accreditation Board of Education and Training/ Quality Council of India
11. Mumbai Coastal Road Project (South) - Princess Flyover to Worli end of Sea Link by M/s Municipal Corporation of Greater Mumbai
2017 Certificate of accreditation provided by consultant did not state the period of validity due to which it could not be ascertained, whether at the time of preparation of EIA report, the consultant was eligible for the same.
12. High Speed Railway Project across CRZ areas in Mumbai, Mumbai Sub-urban, Thane and Palghar District by M/s National High Speed Rail Corporation Ltd, Maharashtra
2019 The Consultants, M/s GPS Technologies Pvt. Ltd was not accredited by National Accreditation Board of Education and Training/ Quality Council of India
13. 2X800 MW Uppur Supercritical Thermal Power Plant at District Ramanathapuram by TANGEDCO, Tamil Nadu
2017 The consultant was not accredited by National Accreditation Board of Education and Training/ Quality Council of India.
14. Laying of treated effluent disposal pipeline from their Plant to final disposal point in the Gulf of Kutch at Mithapur by Tata Chemicals Limited, Gujarat
2017 The consultant National Institute of Oceanography-CSIR was not accredited by National Accreditation Board of Education and Training/ Quality Council of India
15. Setting up of Bulk Drug Manufacturing Unit in East Godavari District by M/s Divi’s Laboratories Limited, Andhra Pradesh
2019 The Consultant M/s Indomer Coastal Hydraulics Pvt. Ltd. was not accredited by National Accreditation Board of Education and Training/ Quality Council of India.
16. International Leather Complex at Kothapatnam village, Nellore District by M/s Adani Port and SEZ Ltd., Andhra Pradesh
2015 The Consultant Environment Protection Training and Research Institute (EPTRI) was not accredited by National Accreditation Board of Education and Training/ Quality Council of India.
17. Deepening of approach channel for capesize vessels at Mormugao Port by M/s Mormugao Port Trust, Goa
2016 The Consultant M/s WAPCOS Limited, Gurgaon was not accredited by National Accreditation Board of Education and Training/ Quality Council of India.
18. Rerouting of Mumbai Manmad pipeline by M/s Bharat Petroleum Corporation Limited, Maharashtra
2015 The Consultant M/s Eco Chem Sales and Services, was not accredited by National Accreditation Board of Education and Training/ Quality Council of India.
19. Proposal for 5 MLD Hybrid Desalination Project at IREL Complex, Chatrapur, Ganjam District by M/s Indian Rare Earths Limited, Odisha
2018 It was observed that the accreditation certificate pertaining to Mecon, Ranchi, was placed on the records instead of accreditation certificate of Mecon Ltd., Bangalore which was actually involved.
Performance Audit Report on Conservation of Coastal Ecosystems
76
S. No. Project Project approval by MoEF&CC
Consultant for EIA
20. Integrated Cooum River Eco-Restoration Project by M/s Chennai Rivers Restoration Trust, Tamil Nadu
2017 The Consultant M/s SV Enviro labs and consultants, was not accredited by National Accreditation Board of Education and Training/ Quality Council of India.
21. Converting open parking into covered parking in beach resort at Chengalpattu Taluk, District Kancheepuram by M/s Adayar Gate Hotels, Tamil Nadu
2015 The Environmental Management Plan submitted by the PP did not mention the name of the accredited consultant organisation which prepared it.
Report No. 4 of 2022
77
Annexure 3: Employment of old baseline data
(Reference: Para 3.1 (ii) of the report)
S.No. State Name of the Project Date of Project clearance
Years by which the data was outdated
1. Andhra Pradesh
Development of offshore LNG FSRU Facility at Kakinada Deep Port Water by Andhra Pradesh Gas Distribution Corporation Limited (APGDC)
09.02.2016 3 to 4 years
2. Andhra Pradesh
International Leather Complex at Kothapatnam village, Nellore District by M/s Adani Port and SEZ Ltd.
19.12.2015 4 years
3. Gujarat Establishment of intake and outfall facility for Nuclear Power Plant at Mithivirdi, District Bhavnagar, Gujarat by M/s Nuclear Power Corporation of India Limited
03.05.2015 3 years
4. Gujarat Laying of treated effluent disposal pipeline from their Plant to final disposal point in the Gulf of Kutch at Mithapur by M/s Tata Chemicals Limited
10.07.2016 6 years
5. Gujarat Common treated effluent disposal pipeline project along river Kolak upto deep sea via Kolak Estuary by M/s Wel Treat Enviro Management Organization
05.09.2016 6 years
6. Gujarat Development of the Petroleum, Chemical and Petrochemical Investment Region (PCPIR) at Dahej, Vagra, District Bharuch by M/s Gujarat Industrial Development Corporation
7. Karnataka Construction of Petroleum Products Storage Terminal at Karwar, Karnataka Port by M/s Tropicana Liquid Storage (P) Ltd.
17.06.2015 7 years
8. Maharashtra Mumbai Trans Harbor Sea Link by M/s Mumbai Metropolitan Region Development Authority
9. Maharashtra Mumbai Coastal Road Project (South) - Princess Flyover to Worli end of Sea Link by M/s Municipal Corporation of Greater Mumbai
10. Maharashtra Malad sewage treatment plant 28.08.2017 8 years
11. Odisha Multi- product SEZ/ Industrial Park at Gopalpur, Ganjam, Odisha by M/s Tata Steel SEZ Ltd.
20.09.2018 2 years
12. Tamil Nadu 2X800 MW Uppur Supercritical Thermal Power Plant at District Ramanathapuram by M/s Tamil Nadu Generation & Distribution Corporation Ltd. (TANGEDCO)
Perf
orm
ance
Aud
it Re
port
on
Cons
erva
tion
of C
oast
al E
cosy
stem
s
78
Anne
xure
4: E
IA fa
iled
to a
sses
s the
pos
sibl
e im
pact
s of t
he p
roje
cts o
n m
arin
e flo
ra a
nd fa
una,
eco
logi
cally
vul
nera
ble
area
s
(Ref
eren
ce: P
ara
3.1
(iii)
of th
e re
port
)
S.
No.
St
ate
Nam
e of
the
Proj
ect
Risk
to m
arin
e flo
ra a
nd fa
una,
eco
logi
cally
vul
nera
ble
area
s M
itiga
tion
mea
sure
s not
env
isage
d in
th
e EI
A 1.
Andh
ra
Prad
esh
Mar
ine
disp
osal
of t
reat
ed
efflu
ent
by M
/s C
oval
ent
Labo
rato
ries P
vt. L
td
As p
er t
he i
nfor
mat
ion
avai
labl
e in
the
EIA
, th
e pi
pelin
e pa
ssed
th
roug
h CR
Z-III
are
a, th
e 'N
DZ' a
nd th
e in
ter-
tidal
zone
with
pat
ches
of
sand
dun
es w
ith c
oast
al v
eget
atio
n of
hei
ght
less
tha
n 3
met
er a
ll al
ong
the
shor
elin
e.
EIA
did
not i
nclu
de a
ny im
pact
on
the
sand
du
nes
and
no m
itiga
tion
mea
sure
s w
as
envi
sage
d.
2.
An
dhra
Pr
ades
h De
velo
pmen
t of
offs
hore
LN
G FS
RU
Faci
lity
at
Kaki
nada
Dee
p Po
rt W
ater
by
An
dhra
Pr
ades
h Ga
s Di
strib
utio
n Co
rpor
atio
n Li
mite
d (A
PGDC
)
The
only
miti
gatio
n m
easu
res
that
wer
e in
clud
ed in
the
EIA
of
this
proj
ect w
as th
at p
iling
ope
ratio
ns sh
ould
use
a so
ft st
art s
o as
to a
llow
m
arin
e fa
una
to le
ave
the
area
bef
ore
high
noi
se le
vels
are
gene
rate
d.
EIA
repo
rt d
id n
ot d
elib
erat
e up
on t
he
impa
ct o
f the
pro
ject
on
any
of th
e m
arin
e lif
e fo
rms
exce
pt fi
shes
in t
he s
tudy
are
a w
hich
clea
rly in
dica
ted
that
the
miti
gatio
n of
th
e en
viro
nmen
tal
impa
cts
of
the
proj
ect
on m
arin
e ec
osys
tem
s w
ere
not
cons
ider
ed.
3.
Go
a De
epen
ing
of
appr
oach
ch
anne
l fo
r ca
pesiz
e ve
ssel
s at
Mor
mug
ao P
ort
by
M/s
M
orm
ugao
Po
rt
Trus
t
1. T
he E
IA re
port
stat
ed th
ere
was
sign
ifica
nt p
ress
ure
due
to to
urism
on
the
Hum
pbac
k do
lphi
n an
d th
e co
ral r
eefs
sur
roun
ding
Gra
nde
Isla
nd a
nd th
at d
redg
ers
and
asso
ciat
ed v
esse
l mov
emen
t may
har
m
the
dolp
hins
, due
to co
llisio
n, p
rope
ller a
ctio
n et
c. S
tudi
es h
ave
show
n th
at th
e ris
k of
a co
llisio
n oc
curr
ing
and
the
likel
ihoo
d th
at it
will
resu
lt in
sev
ere
or le
thal
inju
ry in
crea
ses
whe
n ve
ssel
s ex
ceed
10–
14 k
nots
an
d as
the
vess
els
to b
e co
nsid
ered
in th
e ap
proa
ch c
hann
el w
ere
to
mov
e at
a sp
eed
of 1
1 kn
ots,
it w
as li
kely
to c
ause
inju
ry.
The
Impa
ct st
udie
s for
the
sam
e w
ere
not
carr
ied
out i
n th
e EI
A as
a re
sult
of w
hich
no
miti
gatio
n m
easu
res w
ere
stip
ulat
ed.
2. A
s per
the
EIA
repo
rt, C
hika
lim- S
anco
le b
ay k
now
n fo
r its
inte
rtid
al
mar
ine
biod
iver
sity
was
just
4 k
ms
away
from
the
dred
ging
are
a an
d w
as k
now
n to
har
bour
mor
e th
an 2
00 f
auna
l and
34
phyt
opla
nkto
n sp
ecie
s in
add
ition
to
man
grov
es a
nd w
indo
wpa
ne o
yste
r (P
lacu
na
plac
enta
) (s
ched
ule-
4 sp
ecie
s).
The
EIA
repo
rt a
lso m
entio
ned
that
dr
edgi
ng in
fluen
ce w
as n
orm
ally
rest
ricte
d to
a m
axim
um o
f 4 k
m o
f th
e ac
tivity
.
The
impa
ct o
f dr
edgi
ng w
as n
ot c
arrie
d ou
t for
suc
h an
eco
-sen
sitiv
e zo
ne w
ithin
th
e st
udy
area
an
d no
m
itiga
tion
mea
sure
s wer
e st
ipul
ated
.
Repo
rt N
o. 4
of 2
022
79
S.
No.
St
ate
Nam
e of
the
Proj
ect
Risk
to m
arin
e flo
ra a
nd fa
una,
eco
logi
cally
vul
nera
ble
area
s M
itiga
tion
mea
sure
s not
env
isage
d in
th
e EI
A 3.
The
EIA
Repo
rt e
xhib
ited
that
the
inte
rtid
al a
rea
of Z
uari
estu
ary
whi
ch in
clud
ed C
hica
lim- S
anco
le B
ay, G
rand
e Is
land
, Cab
oraj
- Siri
dao
rock
y pa
tch
with
in th
e st
udy
area
show
ed sp
ecie
s div
ersit
y co
mpr
ising
of
186
aqu
atic
spec
ies (
150
finfis
h co
mpr
ising
of p
elag
ic a
nd d
emer
sal
fishe
s an
d 36
she
ll fis
h co
mpr
ising
of c
rust
acea
ns a
nd m
ollu
scs)
. The
G
rand
e Is
land
was
rich
in C
oral
, spo
nge,
fish
and
the
inte
rtid
al h
abita
ts
betw
een
Cabo
raj-
Dona
Pau
la- S
irida
o ha
d hi
gh s
eaw
eed
abun
danc
e an
d di
vers
ity.
Alth
ough
, th
e re
port
list
ed t
he i
mpa
cts
such
as
la
nd
recl
amat
ion,
m
inin
g,
indu
stria
lizat
ion
and
dred
ging
po
sing
cons
ider
able
thr
eat
to t
he m
arin
e flo
ra
and
faun
a. T
he m
itiga
tion
mea
sure
s to
be
take
n fo
r th
eir
cons
erva
tion
and
man
agem
ent
wer
e no
t el
abor
ated
in t
he
EIA
4.
Gu
jara
t Ex
pans
ion
of
Adan
i Pe
tron
et
(Dah
ej)
Port
, Bh
aruc
h Di
stric
t by
M
/s
Adan
i Pe
tron
et
(Dah
ej)
Port
Pvt
Ltd
The
EIA
Repo
rt e
nvisa
ged
gene
ratio
n of
was
tew
ater
dur
ing
conc
rete
ca
stin
g, cl
eani
ng o
f con
stru
ctio
n eq
uipm
ent,
vehi
cle
gara
ge w
orks
hop,
oi
l spi
lls f
rom
the
ope
ratio
n of
con
stru
ctio
n eq
uipm
ent
and
Dies
el
Gene
ratin
g se
t an
d th
e sa
me
was
sta
ted
to a
ffect
the
mar
ine
wat
er
qual
ity n
ear t
he sh
orel
ine.
Desp
ite th
e id
entif
icat
ion
of t
he im
pact
s,
no m
itiga
tion
mea
sure
s w
ere
enun
ciat
ed
in th
e EI
A re
port
.
The
popu
latio
n of
the
inte
rtid
al m
acro
ben
thos
indi
cate
d re
lativ
ely
high
sta
ndin
g st
ock
of m
acro
ben
thos
with
mod
erat
e gr
oup
dive
rsity
. Th
e EI
A fu
rthe
r sta
ted
that
the
recl
amat
ion
wou
ld im
pact
nea
rly 2
3 ha
. of
ben
thic
hab
itat a
nd n
o re
cove
ry o
f ben
thic
org
anism
s w
as p
ossib
le
as th
e ha
bita
t wou
ld b
e pe
rman
ently
lost
due
to re
clam
atio
n.
No
miti
gatio
n m
easu
res
wer
e en
visa
ged
for t
he p
rote
ctio
n of
ben
thic
org
anism
s in
the
proj
ect a
rea.
5.
Gu
jara
t Es
tabl
ishm
ent
of
inta
ke
and
outf
all
faci
lity
for
Nuc
lear
Po
wer
Pl
ant
at
Mith
ivird
i, Di
stric
t Bh
avna
gar,
Guja
rat b
y M
/s
Nuc
lear
Po
wer
Co
rpor
atio
n of
In
dia
Lim
ited
1.
The
EIA
repo
rt in
dica
ted
that
the
proj
ect a
rea
was
mod
erat
ely
prod
uctiv
e in
ter
ms
of p
hyto
plan
kton
s an
d zo
opla
nkto
ns. M
angr
ove
vege
tatio
n co
mpr
ising
of R
hizo
phor
a an
d Av
icen
nia
spec
ies w
as fo
und
in g
ood
num
ber
on t
he r
iver
ban
ks n
ear
Alan
g sh
ipya
rd a
nd c
oast
al
vege
tatio
n co
mpr
ising
of C
assia
spec
ies,
Pro
sopi
s, A
zadi
rach
ta sp
ecie
s.
The
proj
ect
area
nea
r th
e Al
ang
ship
yard
had
vas
t ex
pans
e of
Tid
al
flats
/ mud
flats
.
Both
th
e EI
A Re
port
an
d th
e CR
Z cl
eara
nce
wer
e sil
ent
on t
he im
pact
s of
th
e pr
ojec
t on
such
var
ied
flora
and
faun
a in
and
aro
und
the
proj
ect
area
. As
the
im
pact
s wer
e no
t ide
ntifi
ed, n
o m
itiga
tion
mea
sure
s wer
e st
ipul
ated
.
2.
The
EIA
repo
rt s
tate
d th
at th
e te
mpe
ratu
re o
f Con
dens
er c
oolin
g w
ater
(CCW
) wou
ld b
e 7°
C a
bove
the
ambi
ent t
empe
ratu
re o
f the
sea
wat
er a
nd it
wou
ld p
roba
bly
be th
e on
ly m
ajor
impa
ct o
n th
e m
arin
e ec
osys
tem
. Fro
m th
e sc
ient
ific
data
ava
ilabl
e in
the
publ
ic d
omai
n, it
The
effe
ct o
f inc
reas
ed t
empe
ratu
re w
as
stud
ied
for f
ishes
onl
y, e
ven
whe
n th
e fis
h la
ndin
g w
as r
epor
ted
to b
e th
e lo
wes
t in
the
regi
on. T
he s
ame
was
not
stu
died
for
Perf
orm
ance
Aud
it Re
port
on
Cons
erva
tion
of C
oast
al E
cosy
stem
s
80
S.
No.
St
ate
Nam
e of
the
Proj
ect
Risk
to m
arin
e flo
ra a
nd fa
una,
eco
logi
cally
vul
nera
ble
area
s M
itiga
tion
mea
sure
s not
env
isage
d in
th
e EI
A co
uld
be
unde
rsto
od
that
in
crea
sed
tem
pera
ture
re
duce
s th
e so
lubi
lity
of o
xyge
n in
wat
er, t
here
by in
crea
sing
the
Biol
ogic
al O
xyge
n De
man
d (B
OD)
.
phyt
opla
nkto
ns a
nd z
oopl
ankt
ons
whi
ch
show
ed m
oder
ate
prod
uctiv
ity.
4.
Acco
rdin
g to
the
mar
ine
EIA,
Ala
ng- S
osiy
a Sh
ip B
reak
ing
Yard
(A
SSBY
) was
loca
ted
at 5
km
s so
uth
of th
e pr
ojec
t are
a an
d ac
cord
ing
to t
he in
form
atio
n av
aila
ble
in t
he p
ublic
dom
ain,
the
re w
as h
eavy
m
etal
con
tam
inat
ion
in t
he in
tert
idal
zon
e of
the
shi
pbre
akin
g ya
rd.
Also
, a p
ropo
sed
Kalp
sar p
roje
ct d
am a
cros
s Gul
f of K
ham
bat w
as a
t a
dist
ance
of
18 k
ms
nort
h of
the
Chh
aya
(Mith
i Vird
i) sit
e. T
he s
ite
sele
ctio
n re
port
(Jun
e 20
07) o
f Dep
artm
ent
of A
tom
ic E
nerg
y (D
AE),
had
reco
mm
ende
d th
at a
det
aile
d st
udy
shou
ld b
e co
nduc
ted
to
exam
ine
the
effe
ct o
f Kal
pasa
r dam
in th
e up
stre
am o
f Nuc
lear
Pow
er
Plan
t site
on
the
flood
ing
of th
e pr
opos
ed si
te d
ue to
bre
akin
g of
dam
in
the
even
t of a
n ea
rthq
uake
of v
ery
high
mag
nitu
de a
s th
e Ka
lpas
ar
dam
was
loca
ted
over
dee
p sil
ted
faul
t.
The
impa
ct o
f the
Ala
ng sh
ipbr
eaki
ng y
ard
and
Kalp
asar
Dam
on
the
proj
ect w
as n
ot
take
n in
to a
ccou
nt. A
s no
impa
cts
wer
e id
entif
ied,
no
miti
gatio
n m
easu
res
wer
e en
visa
ged.
6.
M
ahar
asht
ra
Mum
bai
Coas
tal
Road
Pr
ojec
t (S
outh
) -
Prin
cess
Fl
yove
r to
Wor
li en
d of
Sea
Li
nk
by
M/s
M
unic
ipal
Co
rpor
atio
n of
Gr
eate
r M
umba
i
1. T
he E
IA st
ipul
ated
that
the
man
grov
es in
the
proj
ect a
rea
wou
ld b
e im
pact
ed le
adin
g di
sapp
eara
nce
of r
epro
duct
ion
and
food
zon
e fo
r sp
ecie
s of
fish
, aqu
atic
and
mig
rato
ry b
irds,
Irre
vers
ible
sal
inisa
tion
and
acid
ifica
tion
and
Coas
tline
ero
sion.
Agai
nst
such
co
nseq
uenc
es,
the
miti
gatio
n m
easu
res
sugg
este
d ar
e m
erel
y pe
rfun
ctor
y su
ch
as
dust
su
ppre
ssio
n m
easu
res,
sp
rinkl
ing
of
wat
er,
mon
itorin
g of
noi
se e
tc.
and
did
not
dire
ctly
ad
dres
s th
e im
pact
s id
entif
ied.
2
. The
EIA
repo
rt id
entif
ied
impa
cts,
suc
h as
: For
mat
ion
of se
dim
ent
plum
es t
hat
wou
ld a
ffect
fish
and
ben
thos
, in
crea
sed
turb
idity
af
fect
ing
the
grow
th o
f the
pla
nts,
incr
ease
in P
H of
the
wat
er c
ausin
g al
gal b
loom
, inc
reas
e in
tem
pera
ture
with
redu
ced
diss
olve
d ox
ygen
, Im
med
iate
and
lon
g te
rm d
egra
datio
n of
sen
sitiv
e an
d es
sent
ial
bree
ding
and
nur
sery
hab
itats
for
mar
ine
orga
nism
s le
adin
g to
long
te
rm re
duct
ion
in c
omm
erci
ally
impo
rtan
t fish
.
It w
as
obse
rved
th
at
the
miti
gatio
n m
easu
res
sugg
este
d lik
e th
e us
e of
bes
t pr
actic
able
te
chno
logy
, ap
prop
riate
ha
ndlin
g of
liq
uid
and
solid
w
aste
s
and
adeq
uate
noi
se c
ontr
ol m
easu
res d
id
not d
irect
ly a
ddre
ss th
e id
entif
ied
impa
ct.
Repo
rt N
o. 4
of 2
022
81
S.
No.
St
ate
Nam
e of
the
Proj
ect
Risk
to m
arin
e flo
ra a
nd fa
una,
eco
logi
cally
vul
nera
ble
area
s M
itiga
tion
mea
sure
s not
env
isage
d in
th
e EI
A 7.
Mah
aras
htra
M
alad
sew
age
trea
tmen
t pl
ant
by
M/s
M
unic
ipal
Co
rpor
atio
n of
Gr
eate
r M
umba
i
1. T
he E
IA R
epor
t ca
tere
d to
dev
elop
men
t of
exi
stin
g fa
cilit
ies
to
impr
ove
the
envi
ronm
enta
l con
ditio
ns in
and
aro
und
the
Mum
bai c
ity
inst
ead
of fo
cusin
g on
Mal
ad S
TP a
lone
. As s
uch
it fa
iled
to in
corp
orat
e th
e te
rres
tria
l an
d aq
uatic
eco
logy
com
prisi
ng o
f th
e Be
ntho
s,
Phyt
opla
ntkt
ons,
zoop
lank
tons
in a
nd a
roun
d th
e pr
ojec
t are
a.
As n
o de
tails
of
terr
estr
ial
and
aqua
tic
faun
a w
ere
incl
uded
in
th
e EI
A,
no
impa
cts
on t
hem
wer
e id
entif
ied
and
no
miti
gatio
n m
easu
res w
ere
envi
sage
d.
8.
M
ahar
asht
ra
Layi
ng o
f Nat
ural
Gas
from
U
ran
(Dist
rict
Raig
ad)
to
Nav
i M
umba
i M
unic
ipal
Co
rpor
atio
n pi
pelin
e by
M
/s M
ahan
agar
Gas
Ltd
.
The
pipe
line
was
pa
ssin
g th
roug
h vi
llage
s of
U
ran,
Bo
kadv
ira,
Dron
agiri
, Fu
nde,
Son
ari,
Jasa
i, U
lwe
and
Kille
gaot
han,
all
of w
hich
w
ere
fam
ous
for
thei
r m
angr
oves
. The
pre
sent
atio
n gi
ven
by t
he P
P du
ring
the
EAC
mee
ting
also
show
ed a
n im
age
of th
e pi
pelin
e pa
ssin
g th
roug
h a
dens
e pa
tch
of m
angr
oves
.
Inst
ead
of d
evisi
ng m
itiga
tion
plan
for
pr
otec
tion
and
cons
erva
tion
of
the
man
grov
es,
the
EIA
Repo
rt d
enie
d th
e pr
esen
ce o
f m
angr
oves
its
elf
alon
g th
e ro
ute
of th
e pi
pelin
e.
9.
M
ahar
asht
ra
Expa
nsio
n of
fac
ilitie
s at
po
rt R
edi,
Sind
hudu
rg,
by
M/s
Red
i Por
t Ltd
The
EIA
repo
rt o
nly
iden
tifie
d Tu
rbid
ity o
f wat
er a
s an
impa
ct d
urin
g re
clam
atio
n of
the
area
with
dre
dged
mat
eria
l. EI
A di
d no
t del
iber
ate
upon
the
impa
cts o
f la
nd re
clam
atio
n an
d dr
edgi
ng in
term
s of
loss
of m
arin
e ha
bita
ts; e
ffect
on
mar
ine
bent
hos;
No
miti
gatio
n m
easu
res
wer
e pr
opos
ed f
or e
ven
iden
tifie
d th
reat
s to
en
viro
nmen
t.
10.
M
ahar
asht
ra
All w
eath
er G
reen
field
Je
tty'
at N
andg
aon
of
Talu
ka P
algh
ar, D
istric
t Th
ane,
Mah
aras
htra
by
JSW
Infr
astr
uctu
re L
td.
As p
er th
e EI
A Re
port
the
entir
e fa
cilit
y w
as to
be
crea
ted
on re
clai
med
la
nd. W
e no
ted
that
onl
y co
ncep
tual
layo
ut o
f the
jett
y at
Nan
dgao
n w
as a
vaila
ble
in th
e EI
A Re
port
. How
ever
, thi
s co
ncep
tual
layo
ut w
as
not f
urth
er d
elib
erat
ed u
pon
anyw
here
in th
e EI
A re
port
.
As n
o im
pact
s of
land
rec
lam
atio
n w
ere
iden
tifie
d, n
o m
itiga
tion
mea
sure
s w
ere
envi
sage
d.
11.
M
ahar
asht
ra
Mum
bai T
rans
Har
bour
Se
a Li
nk b
y M
/s M
umba
i M
etro
polit
an R
egio
n De
velo
pmen
t Aut
horit
y
The
MCZ
MA
in it
s re
com
men
datio
n st
ated
that
the
PP w
as to
con
sult
an e
xper
t ag
ency
, un
dert
ake
trai
ning
pro
gram
mes
for
con
stru
ctio
n pe
rson
nel
regu
larly
to
min
imize
the
dam
age
to m
udfla
ts b
efor
e co
mm
ence
men
t to
con
stru
ctio
n w
ork.
Also
, th
e pr
opon
ent
was
to
take
exp
ert
opin
ion
from
Bom
bay
Nat
ural
Hist
ory
Soci
ety
(BN
HS)
rega
rdin
g sa
fegu
ards
to b
e pl
aced
so
as to
miti
gate
the
dist
urba
nces
to
flam
ingo
hab
itat.
etc.
Nie
ther
an
y st
udie
s fo
r ev
alua
tion
of
impa
cts
on m
udfla
ts a
nd f
lam
ingo
s w
as
carr
ied
out
by t
he p
ropo
nent
nor
any
ex
pert
ag
ency
w
as
cons
ulte
d.
As
no
impa
cts
wer
e id
entif
ied,
no
miti
gatio
n m
easu
res w
ere
envi
sage
d.
Perf
orm
ance
Aud
it Re
port
on
Cons
erva
tion
of C
oast
al E
cosy
stem
s
82
S.
No.
St
ate
Nam
e of
the
Proj
ect
Risk
to m
arin
e flo
ra a
nd fa
una,
eco
logi
cally
vul
nera
ble
area
s M
itiga
tion
mea
sure
s not
env
isage
d in
th
e EI
A 12
.
Odi
sha
Mul
ti- p
rodu
ct S
EZ/
Indu
stria
l Par
k at
Go
palp
ur, G
anja
m, O
dish
a by
M/s
Tat
a St
eel S
EZ L
td.
The
proj
ect
area
sho
wed
ric
h di
vers
ity in
ter
ms
of p
hyto
plan
kton
s, zo
opla
nkto
ns a
nd m
oder
ate
dive
rsity
of
Bent
hic
faun
a (p
olyc
haet
e w
orm
s, c
rust
acea
ns,
gast
ropo
ds e
tc.).
and
the
pro
ject
env
isage
d la
ying
of p
ipel
ine.
The
impa
ct o
f tr
ench
ing
on t
he b
enth
ic
faun
a an
d th
e m
itiga
tion
mea
sure
s to
w
ard
off s
uch
impa
ct w
ere
not s
tudi
ed.
13.
Ta
mil
Nad
u In
take
and
out
fall
faci
lity
of M
arin
e Al
gae
in D
istric
t Ra
man
atha
pura
m b
y M
/s
EID
Parr
y (In
dia)
Ltd
The
EIA
repo
rt
men
tione
d ec
olog
ical
ly
impo
rtan
t sp
ecia
lized
ec
osys
tem
s lik
e sa
nd d
unes
, sea
gras
ses
or m
angr
oves
in t
he p
roje
ct
area
.
As
no
impa
cts
wer
e id
entif
ied,
no
m
itiga
tion
mea
sure
s wer
e en
visa
ged.
14.
W
est B
enga
l Se
ttin
g up
of M
ini B
ulk
Carr
iers
Han
dlin
g Fa
cilit
y on
the
upst
ream
of 3
rd o
il Je
tty
and
wes
t ban
k of
riv
er H
oogh
ly a
t Hal
dia
Dock
Com
plex
, Kol
kata
Po
rt (W
est B
enga
l) by
M/s
Ko
lkat
a Po
rt T
rust
The
EIA
Repo
rt sh
owed
the
area
had
a ri
ch d
ensit
y of
phy
topl
ankt
ons,
zoop
lank
tons
and
ben
thos
. The
dom
inan
t flo
ra o
f the
Hal
dia
indu
stria
l zo
ne c
ompr
ised
of v
ario
us s
peci
es o
f tr
ees,
shr
ubs,
her
bs a
nd
clim
bers
, fer
n sp
ecie
s. T
he st
udy
area
com
prise
d of
Nay
acha
r isla
nd a
t th
e m
outh
of t
he H
oogh
ly R
iver
whi
ch h
ad m
angr
oves
.
The
impa
cts
on
phyt
opla
nkto
ns,
zoop
lank
tons
, be
ntho
s,
flora
in
clud
ing
man
grov
es w
ere
not i
dent
ified
in th
e EI
A Re
port
. As
th
e im
pact
s w
ere
not
iden
tifie
d, n
o m
itiga
tion
mea
sure
s w
ere
stip
ulat
ed.
Report No. 4 of 2022
83
Annexure 5: EIA was either devoid of DMP, its specific details or the onus of framing the suitable DMP was left to the project proponent
(Reference: Para 3.1 (iv) of the report)
Cases where onus of framing specific details of DMP were left to PP
S.No State Name of the Project Criteria Observations
1. Goa Deepening of approach channel for capesize vessels at Mormugao Port by M/s Mormugao Port Trust
Emergencies like accidents involving vessels, Oil spill from vessels, Fire/explosion on board vessels within the Port limits and berths, Breakdown of ship engine in the sea, and earthquake were mentioned in the EIA Report and the project site fell under the Zone -III of Seismic Map of India- a moderate intensity zone.
We observed that no mitigation measures for the delineated emergencies were found incorporated in the DMP .
2. Karnataka Development of four berths in Western Dock arm in New Mangalore port by M/s New Mangalore Port Trust
Highlighted in the Report.
3. Maharashtra High Speed Railway Project across CRZ areas in Mumbai, Mumbai Sub-urban, Thane and Palghar District (PH) by M/s National High Speed Rail Corporation Ltd
The EIA Report stated that the project site was classified under the Zone -III, a moderate intensity earthquake zone and that the western coast was subject to occasional severe cyclonic storms.
DMP did not envisage mitigation measures to be taken by the PP during such disaster and whether earthquake resistant structures were used for construction and operation phase.
4. Maharashtra Construction of Hotel Building (Resort 3) in Mauje Karde, Ratnagiri District, Maharashtra by M/s Dajikaka Gadgil Developers Pvt. Ltd.
The project site was classified under the Zone -IV of the Bureau of Indian Standards (BIS) 2000, Seismic Map of India, a zone having major damage risk.
The DMP delineating the types of disasters and the mitigation measures to be taken by the PP during such disaster was not found on the records.
5. Maharashtra Mumbai Trans Harbor Sea Link by M/s Mumbai Metropolitan Region Development Authority
As per the Rapid EIA Report 2012, the project site was classified under the Zone -III of the Bureau of Indian Standards (BIS) 2000, Seismic Map of India, a moderate intensity zone and that the western coast was subject to occasional severe cyclonic storms.
DMP did not detail mitigation measures to be taken by the PP during such disaster and also if earthquake resistant structures were to be used for construction of this sea link.
6. Maharashtra Construction of Hotel Building (Resort 2) in
As per the EIA report, the project site was classified under the Zone
It was observed that a DMP delineating the types
Performance Audit Report on Conservation of Coastal Ecosystems
84
Mauje Karde, Ratnagiri District, Maharashtra by M/s Dajikaka Gadgil Developers Pvt. Ltd.
-IV of the Bureau of Indian Standards (BIS) 2000, Seismic Map of India, a zone having major damage corresponding to intensity VII on the MM (Modified Mercalli Intensity) scale.
of disasters and the mitigation measures to be taken by the PP during such disaster was not prepared by PP.
7. West Bengal Setting up of Mini Bulk Carriers Handling Facility on the upstream of 3rd oil Jetty and west bank of river Hooghly at Haldia Dock Complex, Kolkata Port by M/s Kolkata Port Trust
Highlighted in the report.
Projects where the EIA Reports did not contain any DMP
S. No.
State Name of the Project
1. Gujarat Development of Greenfield Beach Resort at Mandvi, District Kutch by M/s Tourism Corporation of Gujarat Ltd.
2. Gujarat Common treated effluent disposal pipeline project along river Kolak upto deep sea via Kolak Estuary by M/s Wel Treat Enviro Management Organization
3. Gujarat Laying of treated effluent disposal pipeline and diffuse system for disposal of treated wastewater at Marine outfall point in Gulf of Kutch at Mithapur by M/s Tata Chemicals Limited
4. Gujarat Construction of marine bridge between Beyt and Okha, Dwaraka by Road & Building Department
5. Gujarat Additional Salt works (2846.15 acres) located at village Kalatalav & Narmad, Ta. & Dist. Bhavnagar by Nirma Limited
6. Karnataka Construction of Petroleum Products Storage Terminal at Karwar, Karnataka Port by M/s Tropicana Liquid Storage (P) Ltd.
7. Maharashtra Rerouting of Mumbai Manmad pipeline by BPCL
The risk assessment study of the proposed installations which were to be used to formulate the DMP was put as a specific condition in the clearance letter issued to the PP
8. Tamil Nadu Intake and outfall facility of Marine Algae in District Ramanathapuram by M/s EID Parry (India) Ltd
9. Tamil Nadu Highlighted in the report
Repo
rt N
o. 4
of 2
022
85
Anne
xure
6: C
lear
ance
s gra
nted
by
MoE
F&CC
whe
re c
ruci
al p
rere
quis
ites w
ere
left
to th
e PP
to p
repa
re a
nd a
dher
e to
aft
er g
rant
of c
lear
ance
(Ref
eren
ce: P
ara
3.2
(i) o
f the
repo
rt)
S.
No.
St
ate
Nam
e of
the
Proj
ect
Impo
rtan
t pre
requ
isite
s no
t ens
ured
bef
ore
the
gran
t of
clea
ranc
e Re
mar
ks
1.
Gu
jara
t De
velo
pmen
t of
the
pet
role
um,
chem
ical
an
d pe
troc
hem
ical
in
vest
men
t re
gion
(P
CPIR
) at
Da
hej,
Vagr
a, D
istr
ict
Bhar
uch
by
M/s
Gu
jara
t In
dust
rial
Deve
lopm
ent C
orpo
ratio
n
A sp
ecifi
c con
ditio
n in
the
clea
ranc
e le
tter
, stip
ulat
ed th
at a
firm
and
tim
e bo
und
actio
n pl
an fo
r con
serv
atio
n of
man
grov
es a
nd m
udfla
ts
in C
RZ a
rea
was
to
be p
repa
red
thro
ugh
a re
pute
d in
stitu
te a
nd
adeq
uate
fund
s w
ere
to b
e ea
rmar
ked
for i
ts im
plem
enta
tion.
The
pl
an w
as r
equi
red
to b
e m
onito
red
by a
com
mitt
ee c
ompr
ising
re
pres
enta
tives
of P
Ps ,
Guja
rat
Stat
e Fo
rest
Dep
artm
ent
and
the
Guja
rat M
ariti
me
Boar
d.
It w
as
obse
rved
th
at
actio
n pl
an
for
cons
erva
tion
of m
angr
oves
and
mud
flats
in
CRZ
area
was
not
mad
e as
a p
re-r
equi
site
befo
re g
rant
ing
clea
ranc
e to
the
proj
ect.
The
Min
istry
lef
t th
e m
atte
r of
pro
tect
ion
of
man
grov
es a
nd m
udfla
ts in
the
are
a to
PP’
s co
nven
ienc
e.
Anot
her s
peci
fic c
ondi
tion
of c
lear
ance
lett
er re
quire
d pr
epar
atio
n of
sci
entif
ic s
tudi
es f
or C
oast
al M
anag
emen
t Pl
an b
y a
repu
ted
expe
rt in
stitu
tion.
The
res
ults
wer
e to
be
impl
emen
ted
by a
ll th
e st
akeh
olde
rs k
eepi
ng in
vie
w th
e riv
er e
colo
gy a
nd d
epen
denc
y fo
r su
sten
ance
on
fishe
ries
in c
oast
al a
reas
. Alte
rnat
e w
ater
reso
urce
s w
ere
also
to b
e ex
plor
ed to
mee
t the
hug
e w
ater
dem
and
for
the
proj
ect,
in a
dditi
on to
exp
lorin
g th
e be
st re
cycl
ing
prac
tices
.
The
cond
ition
sho
uld
have
bee
n m
ade
a pr
e re
quisi
te b
y th
e m
inist
ry b
efor
e th
e gr
ant o
f cl
eara
nce
as it
is u
nlik
ely
for
any
PP to
car
ry
out s
cien
tific
stu
dies
and
exp
lore
alte
rnat
ive
met
hods
or
re
sour
ces
afte
r re
ceiv
ing
a cl
eara
nce
lett
er f
rom
the
min
istry
for
its
pr
ojec
t.
2.
Gu
jara
t La
ying
of t
reat
ed e
fflue
nt d
ispos
al
pipe
line
from
the
ir Pl
ant
to f
inal
di
spos
al p
oint
in th
e Gu
lf of
Kut
ch
at
Mith
apur
by
M
/s
Tata
Ch
emic
als L
imite
d
A sp
ecifi
c co
nditi
on o
f cle
aran
ce le
tter
req
uire
d th
e PP
to d
evel
op
the
Base
line
for M
arin
e an
d co
asta
l bio
dive
rsity
of P
oshi
tra
Bay
and
mon
itor t
he sa
me
bi-a
nnua
lly w
ith sp
ecifi
c fo
cus o
n se
a gr
ass b
eds,
an
d en
dem
ic s
peci
es S
akur
aeol
is gu
jara
tica
and
Ante
aeol
idie
lla
posh
itra
(mol
lusc
s spe
cies
).
As
a ba
selin
e co
uld
not
be
reco
rded
re
tros
pect
ivel
y af
ter
initi
atin
g a
proj
ect,
inse
rtin
g su
ch a
con
ditio
n in
the
cle
aran
ce
lett
er w
as m
eani
ngle
ss.
The
sam
e sh
ould
ha
ve b
een
mad
e as
a p
re-r
equi
site
of t
he
proj
ect c
lear
ance
.
3.
Gu
jara
t Co
nstr
uctio
n of
Re
siden
tial
proj
ect
‘Sun
City
’ at
Bar
bodh
an
villa
ge,
Sura
t by
Pr
amuk
h O
rgan
izers
LLP
Som
e pa
rt o
f con
stru
ctio
n ar
ea p
ropo
sed
by P
P w
as fa
lling
with
in
CRZ-
III. I
nste
ad o
f ins
istin
g fo
r rev
ised
proj
ect l
ay o
ut m
ap fr
om th
e PP
, GCZ
MA
soug
ht o
nly u
nder
taki
ng fr
om th
e PP
that
it w
ill n
ot ca
rry
out a
ny c
onst
ruct
ion
activ
ity in
the
CRZ-
III
Guja
rat S
CZM
A in
its
reco
mm
enda
tion
lett
er
to S
EIAA
had
put
a c
ondi
tion
that
PP
shou
ld
not c
arry
out
any
con
stru
ctio
n in
NDZ
. SEI
AA
did
not i
nsist
upo
n th
e re
vise
d pr
ojec
t lay
out
Perf
orm
ance
Aud
it Re
port
on
Cons
erva
tion
of C
oast
al E
cosy
stem
s
86
S.
No.
St
ate
Nam
e of
the
Proj
ect
Impo
rtan
t pre
requ
isite
s no
t ens
ured
bef
ore
the
gran
t of
clea
ranc
e Re
mar
ks
map
bef
ore
gran
ting
clea
ranc
e to
ens
ure
adhe
renc
e to
this
cond
ition
.
4.
Gu
jara
t De
velo
pmen
t of G
reen
field
Bea
ch
Reso
rt a
t Man
dvi,
Dist
rict K
utch
by
M/s
To
urism
Co
rpor
atio
n of
Gu
jara
t Ltd
.
Som
e pa
rt o
f con
stru
ctio
n ar
ea p
ropo
sed
by T
CGL w
as fa
lling
with
in
NDZ
(NDZ
) i.e
., 20
0 m
land
war
d sid
e fr
om H
TL.
Guja
rat S
CZM
A in
its
reco
mm
enda
tion
lett
er
to M
oEF&
CC h
ad p
ut a
con
ditio
n th
at P
P sh
ould
not
carr
y ou
t any
cons
truc
tion
in N
DZ.
EAC
did
not i
nsist
upo
n th
e re
vise
d pr
ojec
t lay
ou
t map
from
the
PP to
ens
ure
adhe
renc
e to
th
is co
nditi
on.
5.
Ka
rnat
aka
Cons
truc
tion
of H
otel
Bui
ldin
g in
M
anga
lore
, Da
kshi
na
Kann
ada
Dist
rict b
y M
/s. M
otim
ahal
Hot
els
Pvt.
Ltd.
The
prop
osed
pro
ject
site
fell
in t
he C
RZ-II
are
a an
d th
e pr
opos
ed
cons
truc
tion
activ
ity w
as a
t a d
istan
ce o
f 34
met
res f
rom
the
HTL
of
Guru
pur R
iver
. Th
e cl
eara
nce
lett
er st
ipul
ated
that
the
park
ing
site
shou
ld b
e sh
ifted
bey
ond
the
‘NDZ
’ of 2
00 m
etre
s fr
om th
e HT
L.
It w
as o
bser
ved
that
the
EAC
left
it o
n th
e PP
to
shi
ft th
e pa
rkin
g sit
e be
yond
NDZ
and
did
no
t req
uire
a re
vise
d co
ncep
tual
pla
n be
fore
re
com
men
ding
the
proj
ect f
or c
lear
ance
.
The
clea
ranc
e le
tter
req
uire
d th
at a
rob
ust
rain
wat
er h
arve
stin
g sy
stem
sho
uld
be i
nsta
lled
in c
onsu
ltatio
n w
ith t
he c
once
rned
au
thor
ity.
The
subm
issio
n of
the
rai
n w
ater
har
vest
ing
plan
was
not
mad
e as
a p
re-r
equi
site
befo
re
gran
t of c
lear
ance
.
6.
M
ahar
asht
ra
High
Spe
ed R
ailw
ay P
roje
ct a
cros
s CR
Z ar
eas
in M
umba
i, M
umba
i Su
b-ur
ban,
Th
ane
and
Palg
har
Dist
rict (
PH) b
y M
/s N
atio
nal H
igh
Spee
d Ra
il Co
rpor
atio
n Lt
d
Whi
le
reco
mm
endi
ng
the
proj
ect
the
EAC
requ
ired
that
co
mpr
ehen
sive
man
grov
e pl
anta
tion
and
man
agem
ent p
lan
was
to
be p
repa
red
by T
he M
angr
ove
Cell,
Tha
ne,
Fore
st D
epar
tmen
t, Go
vern
men
t of M
ahar
asht
ra.
Prep
arat
ion
of
com
preh
ensiv
e m
angr
ove
plan
tatio
n an
d m
anag
emen
t pl
an w
as n
ot
mad
e a
pre-
requ
isite
co
nditi
on
but
was
in
stea
d pu
t as
a s
peci
fic c
ondi
tion
in t
he
clea
ranc
e le
tter
.
Whi
le r
ecom
men
ding
the
pro
ject
the
EAC
req
uire
d th
at a
rob
ust
Cons
erva
tion
and
Man
agem
ent
Plan
for
Tha
ne C
reek
Fla
min
go
Sanc
tuar
y w
ith d
etai
led
actio
n pl
an fo
r im
med
iate
impl
emen
tatio
n in
co
nsul
tatio
n w
ith
the
conc
erne
d ag
ency
in
th
e St
ate
be
deve
lope
d in
con
sulta
tion
with
the
conc
erne
d ag
ency
in th
e St
ate.
Fulfi
lmen
t of
th
is re
quire
men
t w
as
not
insis
ted
befo
re g
rant
ing
clea
ranc
e to
the
pr
ojec
t.
Repo
rt N
o. 4
of 2
022
87
S.
No.
St
ate
Nam
e of
the
Proj
ect
Impo
rtan
t pre
requ
isite
s no
t ens
ured
bef
ore
the
gran
t of
clea
ranc
e Re
mar
ks
A fe
asib
ility
st
udy
on
muc
k tr
ansp
orta
tion
for
poss
ibili
ty
of
alte
rnat
ive
mod
e of
ear
ly t
rans
port
atio
n of
muc
k w
as t
o be
su
bmitt
ed to
the
MoE
F&CC
C w
ithin
six
mon
ths o
f CRZ
cle
aran
ce fo
r fu
rthe
r ex
amin
atio
n an
d po
ssib
le in
clus
ion
as p
art
of t
he p
roje
ct
prog
ram
me.
Feas
ibili
ty s
tudy
of
this
natu
re s
houl
d ha
ve
pref
erab
ly b
een
a pa
rt o
f the
pre
requ
isite
s of
the
proj
ect c
lear
ance
. In
the
inst
ant c
ase,
no
such
stud
ies w
ere
late
r sub
mitt
ed b
y PP
.
The
Expe
rt A
ppra
isal C
omm
ittee
hig
hlig
hted
the
need
for a
sepa
rate
cl
eara
nce
from
th
e Da
hanu
Ta
luka
En
viro
nmen
t Pr
otec
tion
Auth
ority
as
Daha
nu t
aluk
a ha
d sp
ecia
l pr
otec
tion
since
199
1 (M
oEF&
CC —
at t
he b
ehes
t of t
he S
upre
me
Cour
t — h
ad p
asse
d a
notif
icat
ion
decl
arin
g th
e ar
ea a
s ec
olog
ical
ly fr
agile
one
and
had
re
stric
ted
haza
rdou
s ind
ustr
ies i
n th
e ar
ea, a
mon
g ot
her t
hing
s).
We
obse
rved
tha
t se
para
te c
lear
ance
fro
m
the
Daha
nu T
aluk
a En
viro
nmen
t Pr
otec
tion
Auth
ority
bef
ore
gran
ting
clea
ranc
e w
as n
ot
mad
e as
a p
re-r
equi
site
befo
re g
rant
of
clea
ranc
e.
7.
M
ahar
asht
ra
Mal
ad s
ewag
e tr
eatm
ent p
lant
by
M/s
M
unic
ipal
Co
rpor
atio
n of
Gr
eate
r Mum
bai
The
man
grov
e re
plan
tatio
n w
as m
ade
a sp
ecifi
c co
nditi
on o
f th
e CR
Z cl
eara
nce
lett
er.
As p
er C
lear
ance
let
ter,
five
times
the
m
angr
ove
cove
r are
a w
as to
be
repl
enish
ed u
nder
this
proj
ect i
.e.,
180
ha (3
6 ha
X 5
). Th
e PP
how
ever
app
roac
hed
the
Min
istry
stat
ing
that
it w
ould
not
be
poss
ible
for
it t
o ob
tain
180
ha
of la
nd f
or
repl
anta
tion
and
requ
este
d fo
r am
endi
ng th
e sp
ecifi
c con
ditio
n an
d re
plac
ing
the
cond
ition
of r
epla
ntat
ion
of fi
ve ti
mes
the
area
with
5
times
the
man
grov
es a
ffect
ed. T
he s
ame
was
gra
nted
app
rova
l by
mod
ifyin
g th
e cl
eara
nce
lett
er in
Dec
embe
r 201
8
We
note
d th
at th
e M
inist
ry a
men
ded
the
CRZ
Not
ifica
tion
2011
for
allo
win
g th
is pa
rtic
ular
pr
ojec
t in
CRZ-
I are
a.
The
Min
istry
furt
her a
llow
ed m
odifi
catio
n of
th
e sp
ecifi
c co
nditi
on o
f the
cle
aran
ce le
tter
.
Both
thes
e ex
cept
ions
wer
e ag
ains
t the
spiri
t of
pro
tect
ion
of m
arin
e en
viro
nmen
t, w
hich
is
the
actu
al m
anda
te o
f the
Min
istry
.
The
PP i
n th
e 19
6th E
AC m
eetin
g in
form
ed t
hat
it ha
d al
read
y ac
quire
d 24
ha
of
Go
vern
men
t la
nd
suita
ble
for
man
grov
e re
plan
tatio
n in
the
adjo
inin
g Th
ane
dist
rict a
nd th
e sa
me
had
been
ha
nded
ove
r to
the
addi
tiona
l Prin
cipa
l Chi
ef C
onse
rvat
or o
f For
ests
(M
umba
i Man
grov
e Ce
ll) f
or f
urth
er p
roce
ss. T
he b
alan
ce 1
1 ha
. la
nd w
as b
eing
acq
uire
d. H
owev
er,
no e
vide
nce
rela
ting
to t
his
acqu
isitio
n of
the
land
was
foun
d on
the
reco
rds.
Land
acq
uisit
ion
is a
time
taki
ng p
roce
ss b
ut
MoE
F&CC
did
not
mak
e la
nd a
cqui
sitio
n fo
r m
angr
ove
repl
anta
tion
a pr
e-re
quisi
te f
or
gran
t of
cle
aran
ce. T
he m
angr
oves
affe
cted
in
thi
s ca
se w
ere
the
best
sto
ck in
Mum
bai
regi
on. A
lso, c
ompl
ianc
e to
con
ditio
ns o
f the
pr
ojec
t cle
aran
ce w
as n
ot a
ssur
ed.
Perf
orm
ance
Aud
it Re
port
on
Cons
erva
tion
of C
oast
al E
cosy
stem
s
88
S.
No.
St
ate
Nam
e of
the
Proj
ect
Impo
rtan
t pre
requ
isite
s no
t ens
ured
bef
ore
the
gran
t of
clea
ranc
e Re
mar
ks
8.
M
ahar
asht
ra
Mum
bai
Coas
tal
Road
Pr
ojec
t (S
outh
) - P
rince
ss F
lyov
er to
Wor
li en
d of
Sea
Lin
k by
M/s
Mun
icip
al
Corp
orat
ion
of G
reat
er M
umba
i
As
per
CRZ
clea
ranc
e,
prop
onen
t w
as
to
deve
lop
a m
arin
e bi
odiv
ersit
y co
nser
vatio
n pl
an f
rom
an
inst
itute
with
dom
ain
expe
rtise
and
to su
bmit
the
sam
e to
MoE
F&CC
with
in o
ne y
ear.
Gran
t of
cle
aran
ce i
n ab
senc
e of
mar
ine
biod
iver
sity
cons
erva
tion
plan
def
eate
d th
e pu
rpos
e of
the
gran
ting
clea
ranc
e its
elf.
9.
M
ahar
asht
ra
Cons
truc
tion
of
Hote
l Bu
ildin
g (R
esor
t 3)
in
M
auje
Ka
rde,
Ra
tnag
iri D
istric
t, M
ahar
asht
ra b
y M
/s D
ajik
aka
Gadg
il De
velo
pers
Pv
t. Lt
d.
The
cada
stra
l map
(1:4
000
scal
e) o
f the
pro
pose
d sit
e sh
owed
that
a
port
ion
of th
e Re
sort
3 w
as in
the
'NDZ
(NDZ
)' w
hich
acc
ordi
ng to
th
e sit
e pl
an w
as to
be
used
for b
uild
ing
serv
ice
road
s an
d pa
rkin
g pl
ace.
Bu
t th
e cl
eara
nce
lett
er
cate
goric
ally
st
ated
th
at
no
cons
truc
tion
(incl
udin
g ce
men
ted/
conc
retiz
ed
park
ing
spac
e)
shou
ld b
e m
ade
in th
e N
DZ a
rea.
The
EAC
did
not a
sk th
e PP
to su
bmit
a re
vise
d sit
e pl
an s
how
ing
cons
truc
tion
for
park
ing
spac
e/se
rvic
e ro
ads,
bey
ond
the
NDZ
are
a be
fore
rec
omm
endi
ng t
he p
roje
ct a
nd t
he
clea
ranc
e le
tter
was
issu
ed fo
r the
pro
ject
by
MoE
F&CC
with
out e
nsur
ing
the
sam
e.
The
clea
ranc
e le
tter
con
ditio
n re
quire
d th
at a
rob
ust
rain
wat
er
harv
estin
g sy
stem
sho
uld
be i
nsta
lled
in c
onsu
ltatio
n w
ith t
he
conc
erne
d au
thor
ity.
The
plan
was
not
mad
e as
a p
re-r
equi
site
befo
re re
com
men
ding
the
proj
ect
10.
Mah
aras
htra
Co
nstr
uctio
n of
Hot
el B
uild
ing
in
Mau
je
Chan
dran
agar
, Ra
tnag
iri
Dist
rict,
Mah
aras
htra
by
M
/s
Dajik
aka
Gadg
il De
velo
pers
Pvt
. Lt
d. a
nd
Cons
truc
tion
of H
otel
Bui
ldin
g in
M
auje
Kar
de,
Ratn
agiri
Di
stric
t, M
ahar
asht
ra
by
M/s
Da
jikak
a G
adgi
l Dev
elop
ers P
vt. L
td.
The
clea
ranc
e le
tter
enu
ncia
ted
that
a ro
bust
rain
wat
er h
arve
stin
g sy
stem
sho
uld
be i
nsta
lled
in c
onsu
ltatio
n w
ith t
he c
once
rned
au
thor
ity.
The
rain
wat
er h
arve
stin
g pl
an w
as n
ot m
ade
as a
pre
-req
uisit
e be
fore
gra
nt o
f cle
aran
ce.
11.
Odi
sha
Mul
ti- p
rodu
ct S
EZ/ I
ndus
tria
l Par
k at
Gop
alpu
r, Ga
njam
, O
dish
a by
M
/s T
ata
Stee
l SEZ
Ltd
.
Odi
sha
CZM
P as
per
CRZ
Not
ifica
tion
2011
was
app
rove
d by
M
oEF&
CC in
Aug
ust
2018
and
the
cle
aran
ce t
o th
is pr
ojec
t w
as
gran
ted
in S
epte
mbe
r 201
8. A
spec
ific c
ondi
tion
was
inse
rted
in th
e EC
/CRZ
cle
aran
ce le
tter
of
this
proj
ect
that
the
PP
shou
ld e
nsur
e th
at t
he p
roje
ct i
s in
con
sona
nce
with
the
new
Coa
stal
Zon
e
EAC
left
the
onus
of c
ompl
ying
with
the
new
CZ
MPs
on
th
e PP
its
elf,
whe
reas
it
the
resp
onsib
ility
of t
he E
AC t
o de
liber
ate
upon
an
d en
sure
suc
h co
mpl
ianc
e. T
he M
inist
ry in
th
is ca
se s
houl
d ha
ve g
rant
ed c
lear
ance
onl
y
Repo
rt N
o. 4
of 2
022
89
S.
No.
St
ate
Nam
e of
the
Proj
ect
Impo
rtan
t pre
requ
isite
s no
t ens
ured
bef
ore
the
gran
t of
clea
ranc
e Re
mar
ks
Man
agem
ent P
lan.
We
how
ever
obs
erve
d th
at th
e ap
prai
sal o
f the
pr
ojec
t was
don
e as
per
CRZ
Not
ifica
tion
1991
zona
tion.
af
ter P
P go
t a fr
esh
dem
arca
tion
done
bas
ed
on th
e ne
w C
ZMPs
.
12.
Tam
il N
adu
Mod
ifica
tion
of e
xist
ing
iron
ore
term
inal
to
hand
le c
omm
on u
ser
coal
at
Kam
araj
ar p
ort
by M
/s
Kam
araj
ar P
ort L
td.
A sp
ecifi
c co
nditi
on in
the
cle
aran
ce le
tter
stip
ulat
ed t
hat
the
PP
wou
ld h
ave
to d
raw
up
and
impl
emen
t a m
anag
emen
t pla
n fo
r the
pr
even
tion
of fi
res d
ue to
han
dlin
g of
coa
l.
By
clea
ring
the
proj
ect
with
out
a fir
e pr
even
tion
plan
du
e to
co
al
hand
ling,
m
inist
ry d
isreg
arde
d an
im
port
ant
disa
ster
m
anag
emen
t and
miti
gatio
n as
pect
.
The
PP w
as t
o in
vent
orise
the
flo
ral c
ompo
sitio
n of
the
bio
ta o
f m
arin
e an
d in
tert
idal
bio
tope
s an
d dr
aw u
p a
deta
iled
mar
ine
bio
dive
rsity
co
nser
vatio
n m
anag
emen
t pl
an
base
d on
po
ssib
le
impa
cts.
Such
an
inve
ntor
y w
as to
ser
ve a
s a
basis
of
any
envi
ronm
ent
man
agem
ent
plan
and
the
fa
ct t
hat
this
wor
k w
as n
ot f
inish
ed b
efor
e th
e gr
ant o
f cle
aran
ce ra
ises
doub
ts o
ver t
he
impa
ct a
sses
smen
t don
e by
the
PP.
13.
Tam
il N
adu
Alig
nmen
t of
con
veyi
ng m
ain
to
Buck
ingh
am
Cana
l fo
r th
e di
scha
rge
of tr
eate
d se
wag
e fr
om
the
prop
osed
36
M
LD
Sew
age
Trea
tmen
t Pl
ant
(STP
) by
M
/s
Chen
nai M
etro
Wat
er S
uppl
y an
d Se
wer
age
Boar
d Sh
olin
gana
llur
A sp
ecifi
c co
nditi
on i
n th
e cl
eara
nce
lett
er s
tipul
ated
tha
t th
e m
arin
e en
viro
nmen
t of t
he B
ucki
ngha
m C
anal
dur
ing
cons
truc
tion
and
oper
atio
nal p
hase
was
to b
e w
atch
ed th
roug
h a
robu
st m
arin
e en
viro
nmen
t man
agem
ent p
lan.
Mar
ine
envi
ronm
ent
man
agem
ent
plan
was
id
eally
requ
ired
to b
e pr
epar
ed b
y th
e PP
and
ap
prov
ed b
y th
e M
inist
ry b
efor
e th
e pr
ojec
t w
as g
rant
ed c
lear
ance
.
Performance Audit Report on Conservation of Coastal Ecosystems
90
Annexure 7: Non- provision of separate budget towards EMP
(Reference: Para 3.2 (ii) of the report)
S. No. Name of the Project Remarks
1. Laying of treated effluent disposal pipeline from their Plant to final disposal point in the Gulf of Kutch at Mithapur by M/s Tata Chemicals Limited, Gujarat (2017)
No separate budget was earmarked for carrying out environment management activities.
2. Discharge of treated effluent in Bhavnagar creek by M/s Madhu Silica Pvt. Ltd., Gujarat (2015)
PP did not earmark any fund for implementing the EMP.
3. Development of four berths in Western Dock arm in New Mangalore port by M/s New Mangalore Port Trust, Karnataka (2016)
Although, an EMP costing Rs. 30 lakh was earmarked for the project, the detailed budget (capital and recurring cost) was not mentioned in the EIA.
4. Laying of Natural Gas from Uran (District Raigad) to Navi Mumbai Municipal Corporation pipeline by M/s Mahanagar Gas Ltd., Maharashtra (2018)
PP did not make any provisions for detailed EMP budget.
5. Mumbai Trans Harbor Sea Link by M/s Mumbai Metropolitan Region Development Authority, Maharashtra (2016)
Although, an EMP costing Rs. 335 crore was earmarked for the project, the detailed budget (capital and recurring cost) was not mentioned in the EIA.
6. Rerouting of Mumbai Manmad pipeline by BPCL, Maharashtra (2015)
PP did not make any provisions for detailed EMP budget
7. Multi- product SEZ/ Industrial Park at Gopalpur, Ganjam, Odisha by M/s Tata Steel SEZ Ltd., Odisha (2018)
Although, an EMP costing Rs. 45.28 crore was earmarked for the project; the detailed budget (capital and recurring cost) was not mentioned in the EIA.
8. Relaying of Pipeline & Redevelopment of Edible Oil Transit Terminal at Chennai by M/s Ruchi Infrastructure Limited, Tamil Nadu (2018)
Although, an EMP costing Rs. 1.5 lakh was earmarked for the project; the detailed budget (capital and recurring cost) was not mentioned in the EIA.
9. Integrated Cooum River Eco-Restoration Project by M/s Chennai Rivers Restoration Trust, Tamil Nadu (2017)
PP did not make any provisions for detailed EMP budget.
Report No. 4 of 2022
91
Annexure 8: Cases where cumulative studies were not conducted to assess the overall impact
(Reference: Para 3.3 of the report)
S. No. State Name of the Project Remarks 1. Andhra
Pradesh Marine disposal of treated effluent by M/s Covalent Laboratories Pvt. Ltd
A pharma industry was 1.9 km away from the outfall. Cumulative studies to check the effect of the effluents discharged from both the pipelines were not done.
2. Andhra Pradesh
Marine disposal of treated effluent by M/s Hyacinth Pharma Pvt. Ltd
EAC desired a cumulative impact study to assess risk posed by many outfall points in the region. However, the PP did not assess the same.
3. Andhra Pradesh
Setting up of Bulk Drug Manufacturing Unit in East Godavari District by M/s Divi’s Laboratories Limited
Nothing on record indicated that a similar exercise to identify other marine outfalls in vicinity and need for a cumulative assessment was done.
4. Andhra Pradesh
International Leather Complex at Kothapatnam village, Nellore District by M/s Adani Port and SEZ Ltd.
ToRs for the project required a cumulative impact study of marine disposal, considering other marine outfalls in vicinity. However, no such studies were submitted by PP to APCZMA
5. Goa Deepening of approach channel for capesize vessels at Mormugao Port by M/s Mormugao Port Trust (MPT)
Proposed project was within the active “Port Basin/Navigational Channel” area of the MPT Complex. There were large scale activities already on-going in this region with many industries and many Barge Yards and Ship Building units along the bank of Zuari River. EIA report too mentioned that the impacts on marine ecosystems will be of cumulative nature. But PP did not study them.
6. Gujarat Discharge of treated effluent in Bhavnagar creek by M/s Madhu Silica Pvt. Ltd.
Cumulative studies for assessing impacts on the Creek due to disposal by PP in addition to existing 20 MLD disposal of Chitra GDC was not carried out.
7. Maharashtra High Speed Railway Project across CRZ areas in Mumbai, Mumbai Sub-urban, Thane and Palghar District (PH) by M/s National High Speed Rail Corporation Ltd
Cumulative studies for studying the adverse effects of other infrastructure development projects such as Thane Creek Bridge III on the biodiversity of Thane Creek was not done.
8. Maharashtra Construction of Hotel Building (Resort 3) in Mauje Karde, Ratnagiri District, Maharashtra by M/s Dajikaka Gadgil Developers Pvt. Ltd.
The cumulative effects due to proximity to two similar hotel construction sites (Resort 1 and 2) were not assessed.
9. Maharashtra Construction of Hotel Building (Resort 2) in Mauje Karde, Ratnagiri District, Maharashtra by M/s Dajikaka Gadgil Developers Pvt. Ltd.
The cumulative effects due to proximity to two similar hotel construction sites (Resort 1 and 3) were not assessed.
10. Maharashtra Construction of Hotel Building (Resort 1) in Chandranagar, Ratnagiri District, Maharashtra
The cumulative effects due to proximity to two similar hotel construction sites (Resort 2 and 3) were not assessed.
Performance Audit Report on Conservation of Coastal Ecosystems
92
S. No. State Name of the Project Remarks by M/s Dajikaka Gadgil Developers Pvt. Ltd.
11. Odisha Desalination plant for 5MLD hybrid Desalination project.
Cumulative studies for assessing the damage to Marine environment by disposal of brine waste in addition to existing STP discharge into the ocean was not carried out by PP.
Report No. 4 of 2022
93
Annexure 9: Issues related to public hearing
(Reference: Para 3.5 of the report)
S.No. State Name of the Project Issues related to public hearing
Remarks
1. Andhra Pradesh
International Leather Complex at Kothapatnam village, Nellore District by M/s Adani Port and SEZ Ltd.
While examining the records related to the public hearing, it was noticed that all the documents were in vernacular language.
Method adopted to deliberate upon the material in vernacular language by the EAC was not described. Further, the minutes of the meeting, public grievances, their resolutions were not available in the EIA Report.
2. Goa Deepening of approach channel for capesize vessels at Mormugao Port by M/s Mormugao Port Trust
The EAC in had asked PP to upload Volume- II of the EIA Report as it was claimed that the public hearing proceedings were covered in the said volume.
The same was not available on the records, thus, it could not be ascertained if the due procedure was followed.
3. Gujarat Widening and improvement of existing highway by NHAI
Mismatch between the information given during public hearing and that furnished in the EIA.
In public hearing, as per PP, a total of 35652 trees were to be cut for the project, however, as per EIA report, 15000 trees were to be cut.
4. Maharashtra High Speed Railway Project across CRZ areas in Mumbai, Mumbai Sub-urban, Thane and Palghar District (PH) by M/s National High Speed Rail Corporation Ltd
i. Non-provision of the minimum notice period of 30 days.
Public hearing was held in 12 places and the notice period at these places ranged between 03 to 15 days only.
ii. Advertisement for public hearing needs to be published in one major National daily and regional Vernacular daily.
The notice was published in only local newspaper.
iii. Mismatch between the information given in public hearing and that furnished during the EAC meeting.
On the issue of effect of vibrations on the Thane creek flamingos due to construction of tunnels, PP submitted in public hearing that vibrations would not propagate upto creek surface, so there is no adverse impact on flamingos. But PP in its submission to EAC stated that it was not possible to predict the impact of vibrations on flamingos till the work actually started.
5. West Bengal Setting up of Mini Bulk Carriers Handling Facility on the
As per public hearing procedure, the final EIA report should incorporate the
The EIA Report sent to the Ministry was devoid of the responses of the people, the
Performance Audit Report on Conservation of Coastal Ecosystems
94
upstream of 3rd oil Jetty and west bank of river Hooghly at Haldia Dock Complex, Kolkata Port (West Bengal) by M/s Kolkata Port Trust
concerns expressed in the public hearing along with action plan and financial allocation, to address those concerns before it is sent to for appraisal.
action taken by the PP to address the concern raised in the public hearing.
Repo
rt N
o. 4
of 2
022
95
Anne
xure
10:
Non
subm
issi
on o
f man
dato
ry d
ocum
ents
by
the
PPs
(Ref
eren
ce: P
ara
3.7.
2 of
the
repo
rt)
72
incl
udin
g m
arin
e an
d te
rres
tria
l com
pone
nts
73
By a
utho
rised
age
ncy
S. N
o.
Nam
e of
the
proj
ect/
Stat
e
Rapi
d EI
A72
Dis-
aste
r M
gmt
. Repo
rt
Risk
As
smt.
&
Mgm
t. Pl
an
CRZ
map
w
ith
HTL
and
LTL
mar
ked
73
Proj
ect
layo
ut
laid
on
CRZ
map
Map
w
ith
CRZ
zone
s
NoC
from
SP
CBs
for
efflu
ent
disc
harg
e
1.
Deep
enin
g of
app
roac
h ch
anne
l for
cap
esize
ves
sels
at M
orm
ugao
Por
t by
M/s
M
orm
ugao
Por
t Tru
st, G
oa (2
016)
X
2.
Inst
alla
tion
of T
IC, T
oile
t blo
ck, r
ain
shel
ter G
azeb
os, U
tord
a, G
oa
3.
Prov
ision
of M
obile
Toi
let b
lock
(GTD
C), Q
uerim
Bea
ch, G
oa
4.
Cons
truc
tion
of re
sort
(Am
it C
Prab
hu) ,
Goa
5.
Co
nstr
uctio
n of
resid
entia
l hou
se (A
nici
to F
erm
ino
Fern
ande
s) ,
Goa
N.A
.
N
.A.
6.
Cons
truc
tion
of re
siden
tial h
ouse
(Ete
lvin
a Ro
drig
ues)
, Goa
N
.A.
N.A
. 7.
Co
nstr
uctio
n of
Pub
lic C
onve
nien
ces (
GTD
C), C
ando
lim B
each
, Goa
8.
Co
nstr
uctio
n of
toile
t blo
cks,
rain
shel
ter a
nd T
IC ,
Tere
khol
, Goa
9.
Pe
rman
ent T
oile
t blo
ck, U
pgra
datio
n/be
autif
icat
ion
of p
lace
s of t
ouris
tic in
tere
st (G
TDC)
, Pa
lole
m B
each
, Can
cona
, Goa
10.
Cons
t. of
term
inal
bui
ldin
g ov
er e
xist
ing
jett
y in
Pan
aji
11.
Beau
tific
atio
n of
Rua
De
Ore
m C
reek
and
Con
vent
ion
Cent
re, G
oa
12.
Beau
tific
atio
n of
Bea
ch F
ront
Pro
men
dade
, Goa
13
. Co
nstr
uctio
n of
resid
entia
l hou
se (L
uisa
Des
ouza
) , G
oa
N.A
.
N
.A.
14.
Cons
truc
tion
of S
wea
ge T
reat
men
t Pla
nt a
t Col
va (S
IDCL
) , G
oa
15.
Cons
truc
tion
of S
TP (S
IDCL
), Ba
ndor
a, G
oa
16.
Cons
t. of
Sew
age
Trea
tmen
t Pla
nt (1
mld
) (SI
DCL)
, Dur
bhat
, Goa
Perf
orm
ance
Aud
it Re
port
on
Cons
erva
tion
of C
oast
al E
cosy
stem
s
96
17.
Cons
truc
tion
of re
siden
tial H
ouse
(Yuv
raj K
Ban
dodk
ar) ,
Goa
N
.A.
N.A
. 18
. Co
nstr
uctio
n of
new
KCL
stor
age
unit
(Zua
ri Ag
ro C
hem
.), G
oa
19.
Expa
nsio
n of
Ada
ni P
etro
net (
Dahe
j) Po
rt, B
haru
ch D
istric
t by
M/s
Ada
ni P
etro
net (
Dahe
j) Po
rt P
vt L
td, G
ujar
at (2
016)
20.
Deve
lopm
ent o
f Gre
enfie
ld B
each
Res
ort a
t Man
dvi,
Dist
rict K
utch
by
M/s
Tou
rism
Co
rpor
atio
n of
Guj
arat
Ltd
.(201
5)
21.
Disc
harg
e of
10
MLD
indu
stria
l effl
uent
in B
havn
agar
cre
ek, B
havn
agar
by
M/s
Mad
hu
Silic
a Pv
t. Lt
d., G
ujar
at (2
015)
¤
22.
Com
mon
trea
ted
efflu
ent d
ispos
al p
ipel
ine
proj
ect a
long
rive
r Kol
ak u
pto
deep
sea
by
M/s
Wel
Tre
at E
nviro
Man
agem
ent O
rgan
izatio
n, G
ujar
at (2
016)
23.
Layi
ng o
f tre
ated
effl
uent
disp
osal
pip
elin
e at
Mar
ine
outf
all p
oint
in G
ulf o
f Kut
ch a
t M
ithap
ur b
y M
/s T
CL, G
ujar
at, (
2017
) ¤
24.
Revi
val o
f Exi
stin
g Je
tty
with
Liq
uid
Stor
age
Term
inal
, Pip
elin
e Ro
ad C
onne
ctiv
ity,
Gand
hidh
am, K
utch
by
Ahir
Salt
& A
llied
Pro
duct
Pvt
. Ltd
, Guj
arat
25.
Resid
entia
l (Su
bplo
t Typ
e) p
urpo
se p
roje
ct ‘S
un c
ity’ a
t Bar
bodh
an V
illag
e, O
lpad
Tal
uka,
Su
rat b
y Pr
amuk
h O
rgan
isers
LLP
, Guj
arat
26.
Cons
truc
tion
of m
arin
e br
idge
bet
wee
n Be
yt a
nd O
kha,
Dw
arak
a by
Roa
d &
Bui
ldin
g De
part
men
t, Gu
jara
t ¤
27.
Addi
tiona
l Sal
t wor
ks (2
846.
15 a
cres
) loc
ated
at v
illag
e Ka
lata
lav
& N
arm
ad, T
a. &
Dist
. Bh
avna
gar b
y N
irma
Lim
ited
¤
28.
Mum
bai C
oast
al R
oad
Proj
ect (
Sout
h) -
Prin
cess
Fly
over
to W
orli
end
of S
ea L
ink
by M
/s
Mun
icip
al C
orpo
ratio
n of
Gre
ater
Mum
bai (
2017
), M
ahar
asht
ra
29.
Inta
ke a
nd o
utfa
ll fa
cilit
y of
Mar
ine
Alga
e in
Dis
tric
t Ram
anat
hapu
ram
by
M/s
EID
Par
ry
(Indi
a) L
td.(2
016)
, Tam
il N
adu
30.
Alig
nmen
t of c
onve
ying
mai
n to
Buc
king
ham
Can
al fo
r the
disc
harg
e of
trea
ted
sew
age
from
pro
pose
d 36
MLD
Sew
age
Trea
tmen
t Pla
nt (S
TP)
by M
/s C
henn
ai M
etro
Wat
er
Supp
ly A
nd S
ewer
age
Boar
d Sh
olin
gana
llur (
2017
), Ta
mil
Nad
u
31.
Cons
truc
tion
of T
rain
ing
Wal
ls fo
r Per
man
ent S
tabi
lity
of B
ar M
outh
at P
ulic
at V
illag
e by
Fi
sher
ies D
epar
tmen
t, Ta
mil
Nad
u
32.
Wid
enin
g of
Nor
th C
henn
ai T
herm
al P
ower
Sta
tion
Road
& E
nnor
e Po
rt R
oad
by T
amil
Nad
u Ro
ad D
evel
opm
ent C
ompa
ny, T
amil
Nad
u
Repo
rt N
o. 4
of 2
022
97
¤ EI
A re
port
did
not
con
tain
terr
estr
ial c
ompo
nent
33.
Deve
lopm
ent o
f Mal
l at T
hiru
vott
iyur
Vill
age,
Che
nnai
by
M/s
. Alw
arpe
t Pro
pert
ies P
vt.
Ltd.
, Tam
il N
adu
34.
Deve
lopm
ent o
f Fis
hing
Har
bour
at V
ella
palla
m V
illag
e, N
agap
attin
am b
y Fi
sher
ies
Depa
rtm
ent,
Tam
il N
adu
35.
Reno
vatio
n of
Fish
ing
Harb
our a
t Mud
huna
gar,
Cudd
alor
e by
Fish
erie
s Dep
t, Cu
ddal
ore
36.
Prop
osed
Dev
elop
men
t of E
co-P
ark
Bhar
athy
Nag
ar, T
ondi
arpe
t Vill
age,
Che
nnai
by
Grea
ter C
henn
ai C
orpo
ratio
n, T
amil
Nad
u
37.
Cons
truc
tion
of n
ew F
ishin
g H
arbo
ur a
t Tha
rang
amba
di, ,
Nag
apat
tinam
Dist
rict b
y As
sista
nt D
irect
or o
f Fish
erie
s, N
agap
attin
am N
orth
, Tam
il N
adu
38.
Cons
truc
tion
of F
ish L
andi
ng C
entr
e at
Kun
thuk
al, R
aman
atha
pura
m D
istric
t by
Assis
tant
Di
rect
or o
f Fish
erie
s, R
ames
war
am, T
amil
Nad
u
39.
Cons
truc
tion
of G
over
nmen
t Gue
st H
ouse
Bui
ldin
g (G
over
nmen
t Ker
ala)
at K
anya
kum
ari
by A
dditi
onal
Dire
ctor
(Hos
pita
lity)
, Dep
artm
ent o
f Tou
rism
, Gov
ernm
ent o
f Ker
ala,
Tam
il N
adu
40.
Cons
truc
tion
of R
esid
entia
l bui
ldin
g by
Bra
hma
Kum
ari B
eena
, Kan
yaku
mar
i by
Praj
apita
Br
ahm
a ku
mar
is, Is
hwar
iyav
ishw
avid
hyal
aya,
Tam
il N
adu
41.
Cons
truc
tion
of M
emor
ial f
or fo
rmer
Chi
ef M
inist
er o
f Tam
il N
adu
Selv
i J. J
ayal
alith
a by
E
E , B
uild
ing
& C
onst
ruct
ion
Divi
sion
I, P
W D
, Tam
il N
adu
42.
Prop
osed
Res
iden
tial C
ompl
ex a
t Ern
avur
vill
age,
Thi
ruvo
ttiy
ur, T
hiuv
allu
r Dist
rict b
y M
/S.
Coro
mon
dal I
nter
natio
nal l
td, T
amil
Nad
u
43.
Cons
truc
tion
tene
men
ts a
t Fou
r sho
re E
stat
e in
R.S
No.
758
1, 7
582
of M
ylap
ore
Villa
ge b
y M
/S. T
amil
Nad
u Sl
um C
lear
ance
Boa
rd, ,
Tam
il N
adu
44.
Mod
erni
zatio
n of
Fou
ndry
uni
t at s
urve
y N
os.3
9 A
&39
B, K
athi
vakk
am v
illag
e, A
mba
ttur
Ta
luk
by M
/S. H
indu
ja F
ound
ries,
Tam
il N
adu
45.
Prop
osed
Con
stru
ctio
n of
pac
king
of D
ry F
ish a
nd C
hille
d Fr
esh
Fish
by
M/S
. GVD
In
tern
atio
nal,
Chen
nai,
Tam
il N
adu
46.
Cons
truc
tion
of T
una
Fish
ing
Harb
our,
Tiru
vott
iyur
, Che
nnai
by
Fish
erie
s Dep
artm
ent,
Ponn
eri,
Tam
il N
adu
Perf
orm
ance
Aud
it Re
port
on
Cons
erva
tion
of C
oast
al E
cosy
stem
s
98
Anne
xure
11:
Inst
ance
s whe
re th
e co
nditi
ons a
s per
the
clea
ranc
e le
tter
as w
ell a
s the
con
ditio
ns st
ipul
ated
in th
e SC
ZMA
reco
mm
enda
tions
w
ere
not b
eing
com
plie
d w
ith b
y th
e PP
(Ref
eren
ce: P
ara
4.1.
1 of
the
repo
rt)
S. N
o.
Stat
e Pr
ojec
t Nam
e O
bser
vatio
n
1.
Go
a De
epen
ing
of a
ppro
ach
chan
nel
for
cape
size
vess
els
at M
orm
ugao
Po
rt b
y M
/s M
orm
ugao
Por
t Tru
st
As p
er E
IA th
e re
port
, the
PP
had
to p
rovi
sion
Rs. 3
5 la
khs u
nder
Env
ironm
enta
l Man
agem
ent P
lan.
How
ever
, no
fund
s wer
e pr
ovisi
oned
by
PP u
nder
Env
ironm
enta
l Man
agem
ent P
lan.
2.
Gu
jara
t De
velo
pmen
t of
Pr
opos
ed
Petr
oleu
m,
Chem
ical
and
Pet
ro-
Chem
ical
Sp
ecia
l In
vest
men
t Re
gion
, (P
CPIR
) by
G
ujar
at
Indu
stria
l De
velo
pmen
t Co
rpor
atio
n
i. A
scie
ntifi
c stu
dy fo
r Coa
stal
Man
agem
ent P
lan
was
to b
e pr
epar
ed b
y an
exp
ert i
nstit
utio
n an
d th
e sa
me
was
to b
e im
plem
ente
d by
all
the
stak
ehol
ders
. How
ever
, the
stud
y w
as n
ot u
nder
take
n by
the
PP.
ii.
PP h
ad to
pre
pare
env
ironm
enta
l pol
icy
and
get t
he s
ame
appr
oved
by
its B
oard
of D
irect
ors.
How
ever
, th
e En
viro
nmen
tal P
olic
y w
as n
ot p
repa
red
by th
e PP
.
3.
Gu
jara
t La
ying
of t
reat
ed e
fflue
nt p
ipel
ine
and
disp
osal
of
ef
fluen
t in
to
Bhav
naga
r cre
ek
i. O
nlin
e m
onito
ring
sens
ors w
ere
to b
e pr
ovid
ed a
t the
pip
elin
e ou
tlet a
nd a
t the
cre
ek o
utfa
ll. H
owev
er,
no m
onito
ring
sens
ors w
ere
prov
ided
by
the
PP.
ii.
Plan
tatio
n of
man
grov
e pl
anta
tion
in 2
5 ha
. la
nd w
as t
o be
don
e an
d re
port
ed t
o th
e Fo
rest
&
Envi
ronm
ent D
epar
tmen
t/ M
oEF&
CC. N
o pl
anta
tion
was
car
ried
out t
ill d
ate
(Aug
ust 2
021)
by
the
PP.
4.
Gu
jara
t La
ying
of
pipe
line
alon
g th
e riv
er
Kola
k up
to
deep
sea
for
CET
P in
Vi
llage
Mor
ai, V
api
PP w
as r
equi
red
to s
et u
p se
para
te e
nviro
nmen
tal m
anag
emen
t ce
ll fo
r ef
fect
ive
impl
emen
tatio
n of
the
st
ipul
ated
env
ironm
enta
l saf
egua
rds
unde
r th
e su
perv
ision
of a
Sen
ior
Exec
utiv
e. T
he P
P di
d no
t set
up
the
cell.
5.
Gu
jara
t La
ying
of t
reat
ed e
fflue
nt d
ispos
al
pipe
line
from
the
ir Pl
ant
to f
inal
di
spos
al p
oint
in th
e Gu
lf of
Kut
ch
at
Mith
apur
by
M
/s
Tata
Ch
emic
als L
imite
d
i. Ba
selin
e da
ta fo
r Mar
ine
and
coas
tal b
iodi
vers
ity o
f Pos
hitr
a Ba
y w
ere
to b
e de
velo
ped
and
mon
itore
d bi
-ann
ually
with
spe
cific
foc
us o
n se
a gr
ass
beds
, an
d en
dem
ic s
peci
es S
akur
aeol
is gu
jara
tica
and
Ante
aeol
idie
lla p
oshi
tra.
Bas
elin
e st
udie
s wer
e no
t con
duct
ed b
y PP
. ii.
Su
bmiss
ion
of a
nnua
l env
ironm
ent a
udit
repo
rts t
o G
CZM
A. A
nnua
l env
ironm
ent a
udit
repo
rts w
ere
not
subm
itted
by
PP.
iii.
Com
preh
ensiv
e EI
A Re
port
was
to
be p
repa
red
and
subm
itted
to
GCZM
A. P
P di
d no
t su
bmit
any
Com
preh
ensiv
e EI
A Re
port
to G
CZM
A.
Repo
rt N
o. 4
of 2
022
99
S. N
o.
Stat
e Pr
ojec
t Nam
e O
bser
vatio
n
6.
Gu
jara
t Re
viva
l of E
xist
ing
Jett
y w
ith li
quid
St
orag
e Te
rmin
al,
Pipe
line,
Roa
d co
nnec
tivity
, Rai
lway
line
& si
ding
s at
Mith
iroha
r, Ga
ndhi
dham
, Kut
ch
i. PP
had
to
obta
in a
ll ne
cess
ary
perm
issio
ns fr
om d
iffer
ent
Gove
rnm
ent
Depa
rtm
ents
/ Ag
enci
es b
efor
e co
mm
enci
ng th
eir a
ctiv
ities
. GPC
B gr
ante
d Co
nsol
idat
ed C
onse
nt a
nd A
utho
risat
ion
(CCA
) for
layi
ng o
ff on
ly fi
ve p
ipel
ines
, ii.
Du
ring
site
visit
, we
notic
ed th
at P
P ha
d la
id si
x pi
pelin
es e
ach
of 1
800-
met
er le
ngth
. iii
. Th
us, P
P la
id a
nd o
pera
ted
an a
dditi
onal
pip
elin
e w
ithou
t obt
aini
ng C
CA fr
om G
PCB.
iv
. Th
e PP
had
to c
arry
out
man
grov
e pl
anta
tion
in 5
0 ha
. are
a in
con
sulta
tion
with
GEC
/ For
est D
epar
tmen
t w
ithin
a p
erio
d of
two
year
s fro
m th
e da
te o
f com
men
cem
ent o
f the
pro
ject
. No
plan
tatio
n (A
ugus
t 202
1)
was
car
ried
out b
y th
e PP
. v.
PP
was
req
uire
d to
tak
e up
mas
sive
gree
n be
lt de
velo
pmen
t ac
tivity
in c
onsu
ltatio
n w
ith G
EC/
Fore
st
Depa
rtm
ent/
GEE
R Fo
unda
tion
and
subm
it a
com
preh
ensiv
e pl
an t
o fo
rest
dep
artm
ent/
SEI
AA.
PP
neith
er c
onsu
lted
Fore
st D
epar
tmen
t/ G
EC/ G
EER
Foun
datio
n no
r sub
mitt
ed a
ny c
ompr
ehen
sive
plan
. vi
. PP
had
to s
pend
₹ 2
0.67
lakh
and
₹ 2
.51
lakh
incl
uded
as
Capi
tal c
ost
and
Mai
nten
ance
cos
t for
gre
en
belt
deve
lopm
ent a
s per
the
EMP.
PP
did
not i
ncur
any
exp
endi
ture
for t
his p
urpo
se ti
ll da
te.
7.
Gu
jara
t Ad
ditio
nal
Salt
wor
ks
(239
5.15
Ac
res)
loca
ted
at V
illag
e Ka
lata
lav
& N
arm
ad, B
havn
agar
i. As
per
the
con
ditio
n im
pose
d by
GCZ
MA
as w
ell a
s SE
IAA,
PP
was
req
uire
d to
car
ry o
ut m
angr
ove
plan
tatio
n in
add
ition
al 5
0 ha
are
a. T
his c
ondi
tion
was
not
com
plie
d by
the
PP
ii.
PP s
hall
com
miss
ion
a co
mpr
ehen
sive
EIA
thro
ugh
a re
pute
d in
stitu
te.
Com
preh
ensiv
e EI
A w
as n
ot
prep
ared
by
PP
iii.
PP w
as to
regu
larly
car
ry o
ut st
udy
on e
nviro
nmen
tal s
urve
illan
ce c
over
ing
the
stat
us o
f man
grov
es a
nd
othe
r coa
stal
and
mar
ine
ecos
yste
ms i
n th
e vi
cini
ty th
roug
h th
e re
pute
d in
stitu
te a
nd su
bmit
the
repo
rt
ever
y ye
ar to
the
F&E
Depa
rtm
ent.
No
such
stud
y w
as c
arrie
d ou
t by
the
PP.
iv.
PP w
as to
subm
it an
nual
env
ironm
enta
l aud
it re
port
indi
catin
g th
e ch
ange
s with
resp
ect t
o th
e ba
selin
e en
viro
nmen
tal q
ualit
y in
the
coas
tal a
nd m
arin
e en
viro
nmen
t by
the
PP to
F&
E De
part
men
t and
SEI
AA.
This
cond
ition
was
not
com
plie
d by
the
PP
8.
Gu
jara
t Co
nstr
uctio
n of
M
arin
e br
idge
be
twee
n Be
yt D
war
ka a
nd O
kha
by R
oad
and
Build
ing
Depa
rtm
ent,
Jam
naga
r, Go
G
i. PP
was
requ
ired
to se
t up
sepa
rate
env
ironm
enta
l man
agem
ent c
ell.
No
such
cel
l was
cre
ated
by
PP.
ii.
Perm
issio
n fo
r Non
-agr
icul
tura
l use
for t
he la
nd to
be
obta
ined
. The
con
stru
ctio
n ca
mp
was
est
ablis
hed
on th
e ag
ricul
tura
l lan
d w
ithou
t per
miss
ion
for N
on-a
gric
ultu
ral u
se
iii.
Reco
rds
rela
ted
to m
onito
ring
of f
ugiti
ve e
miss
ion
in t
he w
ork
area
req
uire
d to
be
mai
ntai
ned.
Suc
h re
cord
s wer
e no
t mai
ntai
ned.
iv
. U
sed
oil t
o be
sold
to re
gist
ered
recy
cler
s onl
y. A
ccor
ding
to P
P, u
sed
oil w
as b
eing
sold
to lo
cal v
endo
rs
and
not r
egist
ered
recy
cler
s.
Perf
orm
ance
Aud
it Re
port
on
Cons
erva
tion
of C
oast
al E
cosy
stem
s
100
S. N
o.
Stat
e Pr
ojec
t Nam
e O
bser
vatio
n
v.
Annu
al e
nviro
nmen
t aud
it re
port
s ind
icat
ing
chan
ges,
with
resp
ect t
o th
e ba
selin
e en
viro
nmen
tal q
ualit
y in
the
coas
tal a
nd m
arin
e en
viro
nmen
t was
to b
e su
bmitt
ed to
For
est a
nd E
nviro
nmen
t Dep
artm
ent b
y th
e PP
. Ann
ual e
nviro
nmen
t aud
it af
ter c
omm
ence
men
t of c
onst
ruct
ion
was
not
car
ried
out.
vi.
Cons
truc
tion
Cam
p w
as t
o be
kep
t ou
tsid
e CR
Z ar
ea. W
e ob
serv
ed u
sing
Goog
le M
aps
as w
ell a
s th
e ap
prov
ed C
ZMP
for t
he a
rea
that
a p
art o
f the
con
stru
ctio
n ca
mp
fell
unde
r CRZ
are
a vi
i. Co
nstr
uctio
n/in
stal
latio
n of
set
tling
pon
ds a
nd o
il re
cept
ors
to p
reve
nt t
he e
ntry
of t
he s
urfa
ce r
unof
f fr
om fu
el a
nd o
ther
con
tam
inan
ts in
to t
he m
arin
e w
ater
. No
such
set
tling
pon
ds a
nd/o
r oi
l rec
epto
rs
wer
e ob
serv
ed a
t pro
ject
site
.
9.
Ka
rnat
aka
Cons
truc
tion
of
Petr
oleu
m
Prod
ucts
St
orag
e Te
rmin
al
at
Karw
ar,
Karn
atak
a Po
rt b
y M
/s
Trop
ican
a Li
quid
Sto
rage
(P) L
td.
i. Th
ere
is no
Pro
per o
il sp
illag
e co
ntin
genc
y pl
an p
ut in
pla
ce. D
edic
ated
boa
ts fi
tted
with
boo
ms/
skim
ies
etc.
are
not
dep
loye
d to
avo
id o
il sp
illag
e. T
he P
P ha
d no
t tie
d up
with
the
Kar
war
Por
t for
fire
fight
ing
and
oil s
pill
miti
gatio
n m
easu
res.
ii.
Th
ere
is no
com
pute
rized
SCA
DA (
Supe
rviso
ry C
ontr
ol a
nd D
ata
Auto
mat
ion)
sys
tem
for
iden
tifyi
ng
leak
age
in th
e pi
pelin
e to
cut
off
pum
ping
imm
edia
tely
. iii
. Th
e PP
has
not
set
up
sepa
rate
env
ironm
enta
l man
agem
ent
cell
for
effe
ctiv
e im
plem
enta
tion
of t
he
stip
ulat
ed e
nviro
nmen
tal s
afeg
uard
s und
er th
e su
perv
ision
of a
Sen
ior E
xecu
tive.
10.
Ke
rala
Co
chin
Res
iden
tial
Deve
lopm
ent
Proj
ect b
y M
/s T
RIF
Koch
i Pro
ject
s Pr
ivat
e Lt
d, E
rnak
ulam
i. As
per
spe
cific
con
ditio
n I(i
v) o
f EC,
ther
e sh
all b
e no
dev
elop
men
t with
in 0
-200
met
res
from
HTL
. We
obse
rved
that
the
entir
e co
nstr
uctio
n of
the
proj
ect w
as c
arrie
d ou
t with
in 2
00m
of H
TL. N
o ac
tion
has
been
take
n by
MoE
F&CC
/KCZ
MA
agai
nst t
he v
iola
tions
of t
he c
ondi
tions
of E
C.
ii.
Spec
ific
cond
ition
I (x
xx) o
f EC
stip
ulat
ed th
at, u
nder
the
prov
ision
s of E
P Ac
t, 19
86, l
egal
act
ion
shal
l be
initi
ated
aga
inst
the
PP if
con
stru
ctio
n of
the
proj
ect w
as s
tart
ed w
ithou
t EC.
The
Chi
ef T
own
Plan
ner,
Thiru
vana
ntha
pura
m a
ppro
ved
(June
201
2) th
e la
yout
of b
uild
ings
and
usa
ge o
f the
plo
t sub
ject
to th
e co
nditi
on th
at E
C sh
ould
be
obta
ined
for t
he p
roje
ct a
nd, K
ochi
Mun
icip
al C
orpo
ratio
n sh
ould
ens
ure
that
co
nstr
uctio
n is
acco
rdin
g to
CRZ
Not
ifica
tions
. How
ever
, Cor
pora
tion
of K
ochi
has
issu
ed (M
arch
201
1&
July
201
2) b
uild
ing
perm
it to
the
proj
ect b
efor
e th
e iss
ue (F
ebru
ary
2016
) of E
C by
MoE
F&CC
. No
puni
tive
actio
n w
as ta
ken
by M
oEF&
CC/K
CZM
A in
this
rega
rd.
iii.
Clau
se 3
(xi)
of C
RZ N
otifi
catio
n 20
11 d
raw
l of
grou
nd w
ater
is p
erm
issib
le o
nly
whe
n do
ne m
anua
lly
thro
ugh
ordi
nary
wel
ls fo
r drin
king
, hor
ticul
ture
, agr
icul
ture
and
fish
erie
s and
whe
re n
o ot
her s
ourc
e of
w
ater
is a
vaila
ble.
Repo
rt N
o. 4
of 2
022
101
S. N
o.
Stat
e Pr
ojec
t Nam
e O
bser
vatio
n
But d
urin
g JP
V it
was
not
iced
that
the
mai
n so
urce
of w
ater
was
Gro
und
wat
er fo
r whi
ch a
Tub
e w
ell w
as
cons
truc
ted
for m
eetin
g th
e en
tire
wat
er re
quire
men
t.
iv.
As p
er s
peci
fic c
ondi
tion
II (v
i) of
EC,
the
inst
alla
tion
of t
he S
ewag
e Tr
eatm
ent
Plan
t (S
TP)
shou
ld b
e ce
rtifi
ed b
y an
inde
pend
ent e
xper
t and
a re
port
in th
is re
gard
shou
ld b
e su
bmitt
ed to
the
Min
istry
bef
ore
the
proj
ect i
s com
miss
ione
d fo
r ope
ratio
n. T
he p
roje
ct w
as co
mm
issio
ned
with
out t
he ce
rtifi
catio
n by
an
inde
pend
ent e
xper
t on
the
inst
alla
tion
of S
TP.
11.
Ke
rala
Co
nstr
uctio
n of
St
ar
Hote
l at
Al
apph
uzha
Wes
t Vi
llage
, Di
stric
t Al
apph
uzha
by
M/s
Eas
t Ve
nice
Ho
tels
and
Reso
rts P
vt L
td
Cons
truc
tion
of b
asem
ent s
hall
be a
llow
ed o
nly
if N
OC
is ob
tain
ed fr
om S
tate
Gro
und
Wat
er A
utho
rity.
NO
C fr
om G
roun
d W
ater
Aut
horit
y w
as n
ot o
btai
ned
for c
onst
ruct
ion
of th
e ba
sem
ent.
12.
M
ahar
asht
ra
Mum
bai
Coas
tal
Road
Pr
ojec
t (S
outh
) - P
rince
ss F
lyov
er to
Wor
li en
d of
Sea
Lin
k by
M/s
Mun
icip
al
Corp
orat
ion
of G
reat
er M
umba
i
Cond
ition
on
reha
bilit
atio
n an
d re
sett
lem
ent
of t
he f
isher
men
com
mun
ities
in t
he e
vent
pro
ject
impa
cts
exist
ing
livel
ihoo
d pa
tter
n of
thes
e co
mm
uniti
es.
Obs
erva
tion
take
n in
the
mai
n re
port
.
13.
M
ahar
asht
ra
Mum
bai T
rans
Har
bor
Sea
Link
by
M/s
Mum
bai M
etro
polit
an R
egio
n De
velo
pmen
t Aut
horit
y
(MM
RDA)
i. M
MRD
A w
as t
o en
sure
tha
t fis
hing
act
ivity
is n
ot h
ampe
red
durin
g co
nstr
uctio
n an
d op
erat
ion
of t
he
proj
ect a
nd a
sses
s los
s of b
usin
ess t
o th
e pr
ojec
t affe
cted
fish
erm
en d
ue to
the
proj
ect.
ii.
The
MoE
F&CC
app
rove
d (Ja
nuar
y 20
16)
for
dive
rsio
n of
47.
41 h
a of
for
est
land
for
MTH
L pr
ovid
ed
MM
RDA
in co
nsul
tatio
n w
ith th
e St
ate
Gov
ernm
ent s
hall
crea
te a
nd m
aint
ain
alte
rnat
e ha
bita
t/ho
me
for
the
avifa
una
who
se n
estin
g tr
ees
are
to b
e cl
eare
d in
this
proj
ect.
Bird
nes
ts a
rtifi
cial
ly m
ade
out o
f the
ec
o-fr
iend
ly m
ater
ial s
hall
be u
sed
in th
e ar
ea in
clud
ing
fore
st a
rea
and
hum
an se
ttle
men
ts a
djoi
ning
the
fore
st a
rea
bein
g di
vert
ed fo
r the
pro
ject
. Chi
ef C
onse
rvat
or o
f For
est (
T), T
hane
per
mitt
ed (M
ay 2
017)
cu
ttin
g of
tree
s bef
ore
the
com
men
cem
ent o
f con
stru
ctio
n w
ork
of M
THL.
It
was
not
iced
that
alth
ough
a to
tal o
f 669
no
of tr
ees w
ere
rem
oved
for t
he p
roje
ct n
o al
tern
ate
habi
tat
/hom
e fo
r th
e af
fect
ed a
vifa
una
was
cre
ated
. M
MRD
A st
ated
(Se
ptem
ber
2021
) th
at b
ased
on
the
estim
atio
n of
Rs
1.50
lakh
for t
he p
urpo
se o
f art
ifici
al n
ests
alo
ng w
ith R
s 61
lakh
for s
oil a
nd m
oist
ure
cons
erva
tion
wor
k by
the
Dep
uty
Cons
erva
tor
of F
ores
t, Al
ibag
it h
ad d
epos
ited
(Nov
embe
r 20
16)
Rs
62.5
0 la
kh w
ith th
e fo
rest
dep
artm
ent.
Perf
orm
ance
Aud
it Re
port
on
Cons
erva
tion
of C
oast
al E
cosy
stem
s
102
S. N
o.
Stat
e Pr
ojec
t Nam
e O
bser
vatio
n
14.
Tam
il N
adu
Inte
grat
ed
Coou
m
Rive
r Ec
o-Re
stor
atio
n Pr
ojec
t by
M
/s
Chen
nai R
iver
s Res
tora
tion
Trus
t
i. De
silta
tion
of th
e Co
oum
Riv
er in
CRZ
are
a w
as p
erm
itted
for a
qua
ntity
of 5
,08,
177
cu.m
onl
y. A
gain
st
this,
PW
D ha
d ca
rrie
d ou
t des
iltat
ion
of th
e riv
er fo
r a q
uant
ity o
f 8,9
4,75
7 cu
.m, (
i.e.)
3,86
,580
cu.
m. i
n ex
cess
of t
he q
uant
ity p
erm
itted
by
TNSC
ZMA
in it
s rec
omm
enda
tion.
ii.
Silt
gene
rate
d th
roug
h dr
edgi
ng w
as t
o be
sci
entif
ical
ly d
ispos
ed o
utsid
e th
e CR
Z ar
ea. B
undi
ng a
nd
land
scap
ing
chan
ges
wer
e pr
ohib
ited
activ
ities
.
Publ
ic W
orks
Dep
artm
ent r
emov
ed o
nly
40%
of t
he s
ilt g
ener
ated
to d
ump
yard
s, a
nd th
e re
mai
ning
silt
w
as d
epos
ited
on th
e riv
erba
nk, w
hich
led
to fo
rmat
ion
of b
unds
that
affe
cted
the
land
scap
e. T
he a
bove
vi
olat
ions
wer
e ne
ither
det
ecte
d by
the
TNSC
ZMA
nor b
y th
e DC
ZMA,
Che
nnai
regi
on. T
hus n
o ac
tion
was
ta
ken
by t
he a
utho
ritie
s ag
ains
t th
e ab
ove
viol
atio
ns.
F
urth
er,
due
to u
naut
horiz
ed d
umpi
ng o
f ex
cess
ive
silt
and
raisi
ng o
f bun
d he
ight
by
PWD,
the
Gre
ater
Che
nnai
Cor
pora
tion
had
aban
done
d its
am
bitio
us C
ooum
Riv
er F
ront
Dev
elop
men
t Pr
ojec
t of
con
stru
ctio
n/de
velo
pmen
t of
Par
ks, W
alkw
ays,
N
atur
e Tr
ail P
ark
etc
at a
cos
t of R
s.32
.17
cror
e an
d te
rmin
ated
all
cont
ract
s rel
ated
to th
e pr
ojec
t.
15.
Mah
aras
htr
a Re
rout
ing
of
Mum
bai
Man
mad
Pi
pelin
e Th
e cl
eara
nce
lett
er s
tipul
ated
tha
t in
all
the
maj
or w
ater
bod
ies,
the
Hor
izon
tal D
irect
iona
l Dril
ling
(HDD
) m
etho
d sh
ould
be
used
to
avoi
d da
mag
e to
the
man
grov
es.
The
Regi
onal
offi
ce, M
oEF&
CC, N
agpu
r w
as
requ
ired
to m
onito
r th
e im
plem
enta
tion
of e
nviro
nmen
t sa
fegu
ard
thro
ugh
insp
ectio
n an
d th
e BP
CL w
as
requ
ired
to su
bmit
half-
year
ly c
ompl
ianc
e re
port
s.
The
Regi
onal
offi
ce h
as n
ot m
onito
red
the
proj
ect
and
BPCL
had
not
sub
mitt
ed t
he m
anda
tory
hal
f-yea
rly
com
plia
nce
repo
rts t
o th
e re
gion
al o
ffice
.
Regi
onal
offi
ce,
MoE
F&CC
, N
agpu
r st
ated
(Ja
nuar
y 20
21)
that
BPC
L ha
d no
t su
bmitt
ed a
ny i
nfor
mat
ion
pert
aini
ng to
HDD
. It w
as fu
rthe
r cite
d de
ficie
nt m
anpo
wer
for n
on m
onito
ring.
16.
Tam
il N
adu
Alig
nmen
t of
con
veyi
ng m
ain
to
Buck
ingh
am
Cana
l fo
r th
e di
scha
rge
of t
reat
ed s
ewag
e fr
om
the
prop
osed
36
M
LD
Sew
age
Trea
tmen
t Pl
ant
(STP
) b
y M
/s
Chen
nai M
etro
Wat
er S
uppl
y An
d Se
wer
age
Boar
d Sh
olin
gana
llur
i. Al
loca
tion
of 2
% o
f th
e pr
ojec
t co
st t
owar
ds f
ulfil
ling
its C
orpo
rate
Env
ironm
ent
Resp
onsib
ility
(CE
R)
durin
g th
e cu
rren
cy o
f the
pro
ject
. Acc
ount
of m
easu
res t
aken
shou
ld b
e m
aint
aine
d an
d sh
ould
also
be
subm
itted
to th
e CZ
MA
ever
y six
mon
ths.
Thi
s con
ditio
n w
as n
ot c
ompl
ied
with
.
ii.
Regu
lar
soil
and
grou
nd w
ater
tes
t in
and
aro
und
the
proj
ect
site
to e
nsur
e m
onito
ring
grou
nd w
ater
qu
ality
/ le
achi
ng o
f hea
vy m
etal
s and
oth
er to
xic
cont
amin
ants
. Thi
s con
ditio
n w
as n
ot c
ompl
ied
with
.
iii.
Tim
e bo
und
actio
n pl
an fo
r tre
atin
g th
e se
wag
e an
d us
age
of re
sulta
nt e
fflue
nt fo
r ind
ustr
ial a
nd o
ther
ap
plic
atio
ns w
as to
be
mad
e. T
his c
ondi
tion
was
not
com
plie
d w
ith.
iv.
Upl
oadi
ng c
ompl
ianc
e re
port
on
the
stip
ulat
ed c
ondi
tions
on
the
web
site
of th
e PP
was
not
don
e
Repo
rt N
o. 4
of 2
022
103
S. N
o.
Stat
e Pr
ojec
t Nam
e O
bser
vatio
n
v.
Subm
issio
n of
repo
rt o
n ye
ar w
ise e
xpen
ditu
re fr
om th
e fu
nds e
arm
arke
d fo
r env
ironm
ent p
rote
ctio
n to
th
e m
inist
ry a
nd it
s reg
iona
l offi
ce w
as n
ot d
one
17.
Tam
il N
adu
Rela
ying
of
Pi
pelin
e &
Re
deve
lopm
ent
of
Edib
le
Oil
Tran
sit T
erm
inal
at
Chen
nai
by
M/s
Ruc
hi In
fras
truc
ture
Lim
ited
i. Al
loca
tion
of 2
% o
f th
e pr
ojec
t co
st t
owar
ds f
ulfil
ling
its C
orpo
rate
Env
ironm
ent
Resp
onsib
ility
(CE
R)
durin
g th
e cu
rren
cy o
f the
pro
ject
was
to b
e m
ade.
Acc
ount
of m
easu
res
take
n w
ere
to b
e m
aint
aine
d an
d w
ere
also
to b
e su
bmitt
ed to
the
SCZM
A ev
ery
six m
onth
s. T
his c
ondi
tion
was
not
com
plie
d w
ith.
ii.
Upl
oadi
ng c
ompl
ianc
e re
port
on
the
stip
ulat
ed c
ondi
tions
on
the
web
site
of th
e PP
was
req
uire
d. T
his
cond
ition
was
not
com
plie
d w
ith.
iii.
Subm
issio
n of
repo
rt o
n ye
ar w
ise e
xpen
ditu
re fr
om th
e fu
nds e
arm
arke
d fo
r env
ironm
ent p
rote
ctio
n to
th
e m
inist
ry a
nd it
s reg
iona
l offi
ce w
as re
quire
d. T
his c
ondi
tion
was
not
com
plie
d w
ith.
18.
Tam
il N
adu
2X80
0 M
W
Upp
ur
Supe
rcrit
ical
Th
erm
al P
ower
Pla
nt a
t Di
stric
t Ra
man
atha
pura
m b
y TA
NGE
DCO
i. Al
loca
tion
of 2
% o
f th
e pr
ojec
t co
st t
owar
ds f
ulfil
ling
its C
orpo
rate
Env
ironm
ent
Resp
onsib
ility
(CE
R)
durin
g th
e cu
rren
cy o
f the
pro
ject
was
to b
e m
ade.
Acc
ount
of m
easu
res
take
n w
ere
to b
e m
aint
aine
d an
d w
ere
also
to b
e su
bmitt
ed to
the
SCZM
A ev
ery
six m
onth
s. T
his c
ondi
tion
was
not
com
plie
d w
ith.
ii.
Upl
oadi
ng c
ompl
ianc
e re
port
on
the
stip
ulat
ed c
ondi
tions
on
the
web
site
of th
e PP
was
req
uire
d. T
his
cond
ition
was
not
com
plie
d w
ith.
iii.
Subm
issio
n of
repo
rt o
n ye
ar w
ise e
xpen
ditu
re fr
om th
e fu
nds e
arm
arke
d fo
r env
ironm
ent p
rote
ctio
n to
th
e m
inist
ry a
nd it
s reg
iona
l offi
ce w
as st
ipul
ated
. Thi
s con
ditio
n w
as n
ot c
ompl
ied
with
.
Performance Audit Report on Conservation of Coastal Ecosystems
10
Annexure 12: Cases where PPs did not submit any half yearly compliance report
(Reference: Para 4.1.2 (i) of the report)
State Name of the Project
Goa Deepening of approach channel for capesize vessels at Mormugao Port by M/s Mormugao Port Trust
Gujarat i. Widening and improvement of the existing highway to 2-lanes paved shoulder/4 lane/ 6 lane of Bhavnagar- Pipavav- Porbandar-Dwarka Section of NH-8E byNational Highway Authority Limited
ii. Development of Greenfield Beach Resort at Mandvi, District Kutch by M/sTourism Corporation of Gujarat Ltd.
iii. Common treated effluent disposal pipeline project along river Kolakupto deepsea via Kolak Estuary, Vapi by M/s Weltreat Enviro Management Limited
Karnataka Construction of Petroleum Products Storage Terminal at Karwar, Karnataka Port by M/s Tropicana Liquid Storage (P) Ltd.
Kerala i. Cochin Residential Development Project by M/s TRIF Kochi Projects Private Ltd,Ernakulam: As compared to 8 half yearly reports, only 3 compliance reportswere submitted to KSPCB.
ii. Construction of Star Hotel at Alapphuzha West Village, District Alapphuzha byM/s East Venice Hotels and Resorts Pvt Ltd
Tamil Nadu
i. Integrated Cooum River Eco-Restoration Project by M/s Chennai RiversRestoration Trust
ii. Intake and outfall facility of Marine Algae in District Ramanathapuram by M/sEID Parry (India) Ltd
iii. Eco-restoration of Adyar River (2000 m – 4000 m chainage) from ThiruvikaBridge to 400 m upstream to Kotturpuram Bridge
iv. Alignment of conveying main to Buckingham Canal for the discharge of treatedsewage from the proposed 36 MLD Sewage Treatment Plant (STP) by M/sChennai Metro Water Supply And Sewerage Board Sholinganallur
v. Relaying of Pipeline & Redevelopment of Edible Oil Transit Terminal at Chennaiby M/s Ruchi Infrastructure Limited
vi. 2X800 MW Uppur Supercritical Thermal Power Plant at DistrictRamanathapuram by TANGEDCO
Report No. 4 of 2022
1
Annexure 13: Non- submission of Environmental Statement by the PP
(Reference: Para 4.1.2 (ii) of the report)
S. No. Name of the project
1. Alignment of conveying main to Buckingham Canal for the discharge of treated sewage from the proposed 36 MLD Sewage Treatment Plant (STP) by M/s Chennai Metro Water Supply And Sewerage Board Sholinganallur, Tamil Nadu
2. Relaying of Pipeline & Redevelopment of Edible Oil Transit Terminal at Chennai by M/s Ruchi Infrastructure Limited, Tamil Nadu
3. 2X800 MW Uppur Supercritical Thermal Power Plant at District Ramanathapuram by TANGEDCO, Tamil Nadu
4. Cochin Residential Development Project by M/s TRIF Kochi Projects Private Ltd, Ernakulam, Kerala 5. Construction of Petroleum Products Storage Terminal at Karwar, Karnataka Port by M/s Tropicana
Liquid Storage (P) Ltd., Karnataka 6. MMPL rerouting project, Maharashtra 7. Mumbai Trans Harbor Sea Link by M/s Mumbai Metropolitan Region Development Authority,
Maharashtra 8. Mumbai Coastal Road Project (South) - Princess Flyover to Worli end of Sea Link by M/s Municipal
Corporation of Greater Mumbai, Maharashtra 9. Malad sewage treatment plant by M/s Municipal Corporation of Greater Mumbai, Maharashtra 10. Construction of Holiday Resort at Alibag, Dist. Raigarh by M/s Savitri Nandkishor Dube, Maharashtra 11. Proposal for Transportation and Distribution of Natural Gas from Uran to Navi Mumbai Municipal
Corporation, Mumbai, Maharashtra, Maharashtra 12. Construction of Resort on Plot at Mauje Chandranagar, Tal: Dapoli, District Ratnagiri, Maharashtra 13. Construction of Resort on Plot at Mauje Karde, Tal. Dapoli, District Ratnagiri, Maharashtra 14. Construction of Resort on Plot at Mauje Chandranagar, Tal. Dapoli, District Ratnagiri, Maharashtra 15. High Speed Railway Project across CRZ areas in Mumbai, Mumbai Sub-urban, Thane and Palghar District
(PH) by M/s National High Speed Rail Corporation Ltd, Maharashtra 16. All weather Greenfield Jetty' at Nandgaon of Taluka Palghar, District Thane, Maharashtra by M/s JSW
Infrastructure Ltd. , Maharashtra 17. Expansion of facilities at port Redi, Sindhudurg by M/s Redi Port Ltd, Maharashtra
Performance Audit Report on Conservation of Coastal Ecosystems
1
Annexure 14: SCZMAs granted recommendations in the absence of CTE/CTO certificate from the concerned State Pollution Control Board (SPCB)
(Reference: Para 4.1.2 (iii) of the report)
Central Sampled Projects
Tamil Nadu i. Integrated Cooum River Eco-Restoration Project by M/s Chennai RiversRestoration Trust
ii. Intake and outfall facility of Marine Algae in District Ramanathapuram byM/s EID Parry (India) Ltd
iii. Eco-restoration of Adyar River (2000 m – 4000 m chainage)from ThiruvikaBridge to 400 m upstream to Kotturpuram Bridge
Maharashtra Rerouting of Mumbai Manmad pipeline by BPCL
State sampled Projects
Tamil Nadu i. Construction of Tuna Fishing Harbour, Thiruvottiyurii. Construction of residential buildings at Kottivakkam Village, Sholinganallur
Taluk, Kanchipuram District by M/s. Perungudi DevelopersPvt. Ltdiii. Proposed development of Fishing Harbour at Vellapallam, Nagapattinam by
Asst. Director, Fisheries department, Nagapattinam (South)iv. Renovation of Fishing Harbour at Mudhunagar, Cuddalore by Asst. Director,
Fisheries department, Cuddalorev. Proposed widening of North Chennai Thermal Power station Road and
Ennore Port Road by M/s. TN Road Development Company Ltd (TNRDCL)
Maharashtra Redevelopment on property in Mazgaon, Mumbai, renamed as "Harbour Heights” by M/s. Sumer Buildcorp Pvt.
Goa i. Construction of 20 MLD STP at Baina
ii. Construction of 20 MLD STP at Margao
iii. Construction of 1 MLD STP at Durbhat