AERODROME MANUAL Electronic Copy Sunshine Coast ...

145
SUNSHINE COAST AIRPORT PTY LTD. AERODROME MANUAL Initial Issue: February 2006 Updated: February 2019 Version: 1.4 Uncontrolled if printed 1 AERODROME MANUAL Electronic Copy Sunshine Coast Airport Pty Ltd. As Trustee For Sunshine Coast Airport Trust

Transcript of AERODROME MANUAL Electronic Copy Sunshine Coast ...

SUNSHINE COAST AIRPORT PTY LTD. AERODROME MANUAL

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Uncontrolled if printed 1

AERODROME MANUAL

Electronic Copy

Sunshine Coast Airport Pty Ltd. As Trustee For

Sunshine Coast Airport Trust

SUNSHINE COAST AIRPORT PTY LTD. AERODROME MANUAL

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Contents 2

Contents

Authority Introduction

- Checklist of Current Pages

- Amendment History

- Master Contact List

- Distribution List

- Supporting Operational Documents

Abbreviations Definitions Part 1 Aerodrome Information

Section 1 Aerodrome Site

- Aerodrome Layout Plan

- Aerodrome Boundary Plan

- Aerodrome Location Plan

Part 2 Aerodrome Administration and Operating Procedures

Section 1 Aerodrome Administration

- Organisational Structure

- Management Positions

- Conditions, Exemptions, Directions and Variations

Section 2 Aerodrome Emergency Plan

Section 3 Aerodrome Lighting

Section 4 Aerodrome Reporting

Section 5 Unauthorised Entry to Aerodrome

Section 6 Aerodrome Serviceability Inspections

Section 7 Aerodrome Technical Inspections

Section 8 Aerodrome Works Safety

SUNSHINE COAST AIRPORT PTY LTD. AERODROME MANUAL

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Contents 3

Section 9 Aircraft Parking Control

Section 10 Airside Vehicle Control

Section 11 Wildlife Hazard Management

Section 12 Obstacle Control

Section 13 Disabled Aircraft Removal

Section 14 Handling of Hazardous Materials

Section 15 Protection of Radar and Navigational Aids

Section 16 Low Visibility Operations

Section 17 Local Procedures

Part 3 Notification in AIP-ERSA

Section 1 General Information

Section 2 Information for Runways

Section 3 Information about Visual Aid Systems

Section 4 Local Information

Section 5 Aerodrome Radio Communication Services

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Appendices 4

List of Appendices Part Section Appendix Title of document

1 1 1 Sunshine Coast Airport Aerodrome and Facilities, Boundaries and Location Plan No. YBSU-18AP01

1 1 2 Sunshine Coast Airport Land Ownership Plan

2 3 1 Part A: Airport Lighting Daily Checklist – Obstruction Lights &

Hazard Beacons

2 3 1 Part B: Airport Lighting Daily Checklist

2 3 1 Part C: Monthly Serviceability Inspections

2 3 1 Part D: Monthly Technical Inspections

2 3 1 Part E: Quarterly Technical Inspection - PAPI Field Test Report

2 3 1 Part F: Quarterly Technical Inspection

2 3 1 Part G: 6 Monthly Inspection Mt Coolum Obstacle light

2 3 1 Part H: Annual Technical Service

2 3 2 Part A: Annual Technical Inspections – Elevated Runway Edge Lights (60), RTILs (4) and Threshold Lights (4) RTILs (4) – Condition

2 3 2 Part B: Annual Technical Inspections: - Flush Runway Edge Lights (3) and Threshold Lights (12)

Condition

2 3 2 Part C: Annual Technical Inspections – Taxiway/Apron Edge (36) Lights – Condition

2 3 2 Part D: Annual Technical Inspections – PAPI System Runway 18 – Condition

2 3 2 Part E: Annual Technical Inspections – PAPI System Runway 36 – Condition

2 3 2 Part F: Annual Technical Inspections – Illuminated Wind Indicator – Primary – Condition

2 3 2 Part G: Annual Technical Inspections – PAL Equipment Condition

2 3 2 Part H: Annual Technical Inspections – Airport Lighting Controls, Power Supplies and Mains Transformers – Condition

2 3 2 Part I: Annual Technical Inspections – Apron Floodlighting (RPT & GA) – Condition

2 3 2 Part J: Sunshine Coast Airport – Annual airport Lighting and Technical Inspection Report

2 4 1 Aerodrome NOTAM form

2 4 2 List of Persons Appointed as Reporting Officers

2 6 1 Daily Serviceability Inspection Checklist

2 8 1 Example of a Method of Working Plan (MOWP) Title Page

2 9 1 RPT Apron Marking and Usability Plan

2 12 1 OLS 18/36 Plan YBSU-AOM03

2 12 4 OLS HLS J Plan YBSU-AS19AV01

2 12 2 Parameters for the OLS Survey

2 12 3 Crane Operation Approval

2 13 1 Indemnity & Release Form

2 17 1 Pavement Concession Advice Form

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Authority 5

Authority This document has been prepared in accordance with the obligation of Sunshine Coast Airport Pty Ltd. (SCA Pty Ltd.) as Trustee for Sunshine Coast Airport Trust under Civil Aviation Safety Regulations Part 139.B and in particular 139.050 and 139.095 and the Manual of Standards Part 139. The Aerodrome Manual contains details of essential operating procedures that may not necessarily be safety related but are nevertheless required to satisfy the conditions of Sunshine Coast Airport’s aerodrome certificate, other legal requirements and common law obligations of operating the aerodrome. The Aerodrome Manual has been structured to allow existing documents such as the Airport Emergency Plan, Airside Drivers Handbook, Disabled Aircraft Recovery Strategy Plan and the Transport Security Program to be directly referenced. Each of these documents will continue to be amended and published separately but should be regarded as part of the Aerodrome Manual and should be read in conjunction with the Aerodrome Manual. The Civil Aviation Safety Authority requires SCA Pty Ltd. to operate and maintain Sunshine Coast Airport in accordance with the procedures set out in this Aerodrome Manual. All employees of Sunshine Coast Airport are required to comply with the procedures in this Manual. The documented procedures in this Aerodrome Manual are an accurate reflection of both current and best practices. This Aerodrome Manual will be amended as and when necessary to reflect changing standards, operational practices, airport facilities or personnel. The aerodrome manual will be amended from time to time to reflect changes in relevant operations and will be renewed annually. Andrew Brodie Chief Executive Officer March 2019

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Checklist of Current Pages 6

Checklist of current pages

Part Section Number of Pages

Version Number

Contents and Authority All 1.4

Introduction All 1.4

Abbreviations All 1.4

Definitions All 1.4

PART 1 Aerodrome Information

1 Aerodrome Site All 1.4

PART 2

Aerodrome Administration and Operating Procedures

1 Aerodrome Administration All 1.4 2 Aerodrome Emergency Plan All 1.4 3 Aerodrome Lighting All 1.4 4 Aerodrome Reporting All 1.4 5 Unauthorised Entry to Aerodrome All 1.4 6 Aerodrome Serviceability Inspections All 1.4

7 Aerodrome Technical Inspections All 1.4

8 Aerodrome Works Safety All 1.4

9 Aircraft Parking Control All 1.4

10 Airside Vehicle Control All 1.4

11 Wildlife Hazard Management All 1.4

12 Obstacle Control All 1.4

13 Disabled Aircraft Removal All 1.4

14 Handling of Hazardous Materials All 1.4

15 Protection of Radar and Navigational Aids All 1.4

16 Low Visibility Operations All 1.4

17 Local Procedures All 1.4

PART 3

Notification in AIP-ERSA

1 General Information All 1.4 2 Information for Runways All 1.4 3 Information about Visual Aid Systems All 1.4 4 Local Information All 1.4 5 Aerodrome Radio Communication Services All 1.4

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Amendment History 7

Amendment history

Amendment No. Issue Date Page No. Description

Initial issue February 2006 - New Manual issued for Certification compliance

1.0 March 2007 Various Annual Review

2.0 March 2008 Various Annual Review & Amalgamation

3.0 November 2008 Various Annual Review

4.0 July 2010 All Updated due to change of airport name

5.0 September 2011 All Annual Review

6.0 July 2012 All Amendments Required

7.0 July 2014 All Amendments Required

8.0 May 2016 Various Annual Review

1.0

March 2017

All

New manual issued to reflect change of operating entity. Incorporating annual review.

1.1 October 2017 All Various amendments to reflect changes to personnel primarily.

1.2 February 2018 All Various amendments including to reflect arrangements post closure of RWY 12/30 to facilitate Sunshine Coast Airport Expansion Project.

1.3 May 2018 All Update of Contact Details and various updates to reflect changes to organisations etc. Various amendments to reporting forms and templates.

1.4 February 2019 All Review and administration updates

The holder of a controlled copy shall sign and return the obsolete Amendment History Sheet to the Sunshine Coast Airport Manual Controller as a receipt of receiving any amendment and as a certification of amending the controlled copy of the Sunshine Coast Airport Aerodrome Manual. Return the signed obsolete Amendment History Sheet to: Aerodrome Manual Controller Sunshine Coast Airport Pty Ltd. PO Box 9535 Pacific Paradise QLD 4564 Returned by ……………………….………………….Date ……………….…………

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Contents 8

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Master Contact List 9

Master Contact List SUNSHINE COAST AIRPORT PTY LTD.

Contact Business A/Hrs

Chief Executive Officer 4580 4357 0412 668 259

General Manager Operations & Assets

0419 774 843 0419 774 843

On Call Pager 3830 5251 3830 5251

Airport Safety Officer 0419 658 272 3830 5251

Airfield Development Manager 0417 630 377 -

Airfield Manager 0417 613 951 -

Terminal Services Officer 0419 658 829 3830 5251

Terminal Services Manager 0427 392 727 -

Facilities Manager 0439 621 235 -

Assets Technical Officer 0437 535 976 -

Operations Support Officer 0429 534 963 -

Marketing & Communications Manager

0488 780 348 -

AIRSERVICES AUSTRALIA

Manager East Coast Services North

3866 3366 0421 133 437

Air Traffic Control Tower Manager

5458 2952 0479 121 744

Air Traffic Control Tower

5448 2950

Airport Rescue and Fire Fighting – Fire Control Centre

5458 2910 General 5458 2999 Emergency

Airport Rescue and Fire Fighting – Station Manager

5458 2920

0437 663 695

Aust. Notam Office (NOF)

02 6268 5063

AVIATION SECURITY - NATIONAL COORDINATOR

Tel: 1300 791 581 [email protected]

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Master Contact List 10

SURVEILLANCE AUSTRALIA

Navigation Officer (Cobham Australia)

(08) 8154 5664 (08) 8154 5670

CIVIL AVIATION SAFETY AUTHORITY

Airports Inspector 3144 7534 3144 7535

0419 766 105 0419 782 214

Team Leader – Flying Operations

131 757

Team Leader – Air Worthiness

131 757

AUSTRALIAN BORDER FORCE

Brisbane Control Room 07 3867 3851 07 3867 3854

AUSTRALIAN TRANSPORT SAFETY BUREAU

Manager

3838 9902 0438 268 711

24 Hr Answer Service

1800 011 034

AUSTRALIAN SEARCH & RESCUE (AUSAR)

24 Hours (Free Call) 1800 815 257 02 6230 6899

AVIATION AND MARITIME SECURITY DIVISION DEPARTMENT OF HOME AFFAIRS

QUEENSLAND AMBULANCE SERVICE (QAS)

24 Hour Service Emergency 000

Maroochydore Communications Administration 5477 4008

Manager Operations 5420 9996 0412 129 378

Director QLD

3838 9977 0429 484 019

Operations Centre (CBR) 24 Hours

1300 791 581

Select “0”

Compliance Manager 3838 9988 0411 161902

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Master Contact List 11

Operations Supervisor 5453 5303 Fax 0407 184 193

0407 184 193

QUEENSLAND POLICE SERVICE

Emergency 24 hours

000 000

Maroochydore Police Station: Operations Centre Duty Sergeant

5409 0000 5475 2449

000 Emergency

Coolum Officer in Charge 5440 2777

000 Emergency

Noosa Officer in Charge 5440 8111 000 Emergency

Water Police 5457 6711

0438 200 705

Comms Centre 5409 0000

000 Emergency

Superintendent Maroochydore

5409 7970

0407 697 069

Inspector – Support Service Duty Inspector

5409 7971 0400 502 644 0418 755 826

Airport Liaison Officer (Coolum Police)

5440 2777 0402 122 453

AUSTRALIAN FEDERAL POLICE

AFP Operations Support BNE

131 237

131 237

RRDT Team Leader 3624 5204 131 237

QLD FIRE & EMERGENCYSERVICES

Emergency

000

Maroochydore Fire Station 5453 5323 0408 709 084 Area Director Training Officer

0457 546 311 0418 781 887

SUNSHINE COAST STATE EMERGENCY SERVICE

Sunshine Coast Duty Officer 5444 5202 5444 5202

Central

0417 624 959

0417 624 959

SES Coolum Group Leader 5444 5202 0400 997 542

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Master Contact List 12

DEPARTMENT OF COMMUNITY SAFETY

EMQ Duty Officer 5420 7565

Area Director Emergency Management Queensland

5420 7564 0418 792 026 Fax: 5420 7571

0418 792 026

North Coast Regional Director EMQ

5420 7561 0417 001 609 Fax: 5420 7571

0417 001 609

WELFARE ORGANISATIONS

Community Support Coordinator SCC Local Disaster Management Group

5441 8026 0418 886 395

Salvation Army Corps Co-ordinator, Maroochydore

Contact through SCC

Contact through SCC

Red Cross Emergency Services Regional Co-ordinator

07 3367 7490 0488 072 932

Deputy

5437 3202 0490 102 461

DEPARTMENT OF DEFENCE

Directorate of Defence Aviation Safety

02 6266 2647

0410 626 357

AIRLINES

Jetstar & Qantas Qantas Group Security 24 hr Controller

(02) 9691 1818

(02) 9691 1818

Qantas Brisbane Airport Duty Manager

(07) 3867 3405

(07) 3867 3405

Qantas Security Manager – QLD QF Regional

(07) 3867 3229 0407 797 547

(07) 3867 3229 0417 797 547

Qantas Security Manager – Regional Operations

(02) 9691 0316

0407 438 747

Qantas Duty Security Controller (02) 9691 1818

(02) 9691 1818

Cobham (Attn: Jason Schultz) (08) 8154 7076 0422 254 405

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Master Contact List 13

Air New Zealand Brisbane Airport Manager

3622 6606

0424 136 306

Airport Operations Manager 3622 6604 3622 6603 3622 6605

0414 747 452 0448 097 476 0475 833 159 0417 046 325

Virgin Australia

Head of Security Group 3333 6716

0408 991 046

Regional Airports Manager 0423 842 056 0423 842 056

Corporate Emergency Response Planning

3295 5654

0434 605 821

Manager – Swissport Operations

5450 7486

0403 455 443

Virgin Australia Network Operations

(07) 3136 4854 (24hrs)

Media Liaison Officer 07 3087 0757 0438 475 909

Alliance

General Manager Operations 0429 845 787

Ground Operations Compliance and Security Manager

0428 197 909

Security General Manager Operations

0429 845 787

Operations Control Centre (07) 3212 1532 (24hrs)

Corporate Air

Manager- Jeff Boyd 0409 443 338

Charter Operations 02 6249 7044

ATTORNEY GENERAL’S DEPARTMENT

Airport Liaison 3218 0537 0431 636 813

24 hours

LIFEFLIGHT – SUNSHINE COAST

General

5458 8700 5258 8707

1300 883 422

Emergency Contact via ambulance

000

SUNSHINE COAST UNIVERSITY HOSPITAL

Main Operator

5202 0000

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Master Contact List 14

QUEENSLAND HEALTH NAMBOUR HOSPITAL

Switchboard

5470 6600

Medical Superintendent

5470 6612

Coordinator Fire Safety & Emergency Response

5470 6021 0439 709 750

Sunshine Coast & Cooloola

VOLUNTEER COAST GUARD

Mooloolaba Base 5444 3222 0412 767 333

0412 767 333

Commander 0412 545 600 0412 545 600

SURF LIFE SAVING QLD

Marcoola Base 137 873 (13surf) 0413 117 117

0411 141 642

0410 534 089

FUELLING AGENT

Viva Energy (Emergency) 0421 304 008 Home

0406 011 871

ELECTRICAL REPAIRS

After hours Pager 3830 5251 Asset Technical Officer 0437 535 976 0437 535 976

Amos Electrical Business & after hours

0411 869 616 0411 869 616

AIRPORT EMERGENCY OPERATIONS CENTRE (EOC)

Emergency Numbers

Line 1 Line 2 Satellite phone

(07) 5448 7056 (07) 5448 8002 0417 185 913

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Master Contact List 15

OTHER EMERGENCY SERVICES (To be called out by the Police)

Bureau of Emergency Services Chemical Hazards Emergency Management Unit response advice to chemical emergencies

3247 8444

Queensland Health Radiological Expert (Radio Active Material) Department Radiation Health

3406 8000

OTHER ORGANISATIONS

Telecommunications Services Call Trace 24 Hours

000 24 hours

Australia Post Security 24 Hours

3405 1481

Clayton’s Towing Disabled aircraft removal

5441 3888

AIRPORT TENANTS

Aero Dynamic Flight Academy (07) 5448 9555 0403 058 561

Flight Options (07) 5353 5242

Becker Helicopter Services Pty Ltd.

(07) 5457 0066 0458 649 965

Blue Tongue Helicopter Services (07) 5448 8166 (07) 5446 8004 0408 768 677

Maroochy Two One Pty Ltd. 3816 0244

Viva Energy Pty Ltd. 0408 711968 0403 455 482

McDermott Aviation (07) 5447 6600 (07) 5457 0778 0407 030 602

Skydiving Services Pty Ltd. (07) 5446 1855 M0438 928 202

Sunshine Coast Aero Club (07) 5448 8458 0418 131 273

SAKI Pty Ltd. (07) 5478 2241 0417 636 442

LifeFlight Sunshine Coast Base (07) 5458 8700

Pacific Crown (07) 5438 1299

Sunshine Coast Airport Expansion Project

(07) 5453 1544

Swissport (07) 5450 7486

Davies Aviation 1300 747 409

Helitec (Attn. Phil Aldridge) 0412 488 278

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Master Contact List 16

Distribution list

Manual No.

Custodian Company Format

- Chief Executive Officer Sunshine Coast Airport Pty Ltd.

Electronic Copy

1

General Manager Operations & Assets (Master Copy)

Sunshine Coast Airport Pty Ltd.

Printed Document

- Airfield Manager Sunshine Coast Airport Pty Ltd.

Electronic Copy

- Airfield Development Manager

Sunshine Coast Airport Pty Ltd.

Electronic Copy

2 ASO - Car 1 Sunshine Coast Airport Pty Ltd.

Printed Document

3 SCA ATC Tower Manager

Airservices Australia Printed Document

- District Aerodrome Inspector (Brisbane)

Civil Aviation Safety Authority

Electronic Copy

- Sunshine Coast Airport Intranet

Sunshine Coast Airport Pty Ltd.

Electronic Copy

- Assets Technical Officer Sunshine Coast Airport Pty Ltd.

Electronic Copy

- Terminal Services Manager

Sunshine Coast Airport Pty Ltd.

Electronic Copy

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Abbreviations 17

Abbreviations General word abbreviations and phrase contractions to minimise message length of aerodrome NOTAMs (Abbreviations shown in singular words are also applicable to the plural of those words)

AGL Above ground level

AMSL Above mean sea level

ASDA Accelerate-stop distance available

AC Advisory Circular

AD Aerodrome

ADDGM Aerodrome Diagrams

AFRU Aerodrome Frequency Response Unit

AHD Australian Height Datum

ARP Aerodrome Reference Point

AIC Aeronautical Information Circular

AIP Aeronautical Information Publication

(AIP) ERSA Enroute Supplement Australia

AIS Aeronautical Information Service

ATC Air Traffic Control (in general)

ASO Airport Safety Officer

ATS Air traffic services

ACFT Aircraft

ACN Aircraft classification number

AP Airport

APCH Approach

ASPH Asphalt

AUX Auxiliary

AVBL Available

AVGAS Aviation gasoline

AWIS Aerodrome weather information service

C/L Centreline

CWY Clearway

CLSD Close or closed or closing

CN Code number (runway)

CTAF Common Traffic Advisory Frequency

COM Communications

H24 Continuous day and night service

DEG Degrees

DAP Departure and Approach procedures

DISP Displaced

DIST Distance

DME Distance Measuring Equipment

DOC Document

EOC Emergency Operations Centre

EOL Effective operational length

ELEV Elevation

EMERG Emergency

EQPT Equipment

EST Estimate or estimated

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Abbreviations 18

ETA Estimated/estimating time of arrival

ETD Estimated/estimating time of departure

FAX Facsimile transmission

FIS Flight information service

FCST Forecast

FREQ Frequency

GND Ground

HBN Hazard beacon

HEL Helicopter

HJ Sunrise to sunset

HN Sunset to sunrise

HLS Helicopter Landing Site

HLDG Hold(ing)

IFR Instrument flight rule

ILS Instrument landing system

IMC Instrument meteorological conditions

ICAO International Civil Aviation Organisation

IWI Illuminated Wind Indicator

KG Kilogram

KM Kilometres

KMH Kilometres per hour

KPA Kilopascals

KW Kilowatts

LDA Landing distance available

LEN Length

LGT Light or lighting

LIRL Low intensity runway lights

MAG Magnetic

VAR Magnetic variation

MAGS Movement Area Guidance Signs

MAINT Maintenance

MOS Manual of Standards

MTOW Maximum take off weight

MTP Maximum tyre pressure

MSL Mean sea level

MHZ Megahertz

MAE Men and equipment

MOWP Method of Working Plan

M Metres (preceded by figures)

MIL Military

MEHT Minimum eye height over threshold (PAPI system)

MAPT Missed approach point

NM Nautical mile

NOF NOTAM Office

NOTAM Notice to airmen

OBST Obstacle

OLS Obstacle Limitation Surface

OBSTR Obstruction

OPR Operate operator operative operating operational

OPS Operations

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Abbreviations 19

PAPI Precision Approach Path Indicator

PANS-OPS Procedures for Air Navigation Services – Aircraft Operations

PRKG Parking

PAX Passengers

PRC Passenger Reception Centre

PCN Pavement classification number

POB Persons on board

PAL Pilot activated lighting

PWR Power

REF Reference

REQ Requested

REV Review

RPT Regular Public Transport

RWY Runway

RCL Runway centreline

REDL Runway edge light

RESA Runway End Safety Area

RWS Runway strip

RTIL Runway threshold identification light

RTZL Runway touchdown zone light

RVR Runway visual range

SAR Search and Rescue

SCA Sunshine Coast Airport

SNOWTAM Special series NOTAM (message type designator)

STD Standard

SOT Start of TORA (take-off run available)

SWY Stopway

SCA Pty Ltd.

Sunshine Coast Airport Pty Ltd. As Trustee For Sunshine Coast Airport Trust

SCA Sunshine Coast Airport

SCC Sunshine Coast Council

SUP Supplement (AIP Supplement)

STODA Supplementary take-off distance

SFC Surface

TKOF Take-off

TODA Take-off distance available

TORA Take-off run available

TWY Taxiway

TEL Telephone

T Temperature

TEMPO Temporary

THR Threshold

TLW Time-limited WIP (work in progress)

SARTIME Time search action required

TBA To be advised

TDZ Touchdown zone

U/S Unserviceable

UTC Co-ordinated Universal Time

UFN Until further notice

VHF Very high frequency (30-300 MHz)

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Abbreviations 20

VIP Very important person

VFR Visual flight rules

VMC Visual meteorological conditions

VOR VHF Omni-Directional Range

WDI Wind direction indicator

WIE With immediate effect or effective immediately

WIP Work in progress

WSO Works Safety Officer

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Definitions 21

Definitions

Aerodrome A defined area on land or water (including any buildings, installations, and equipment) intended to be used either wholly or in part for the arrival, departure and surface movement of aircraft.

Aerodrome elevation The elevation of the highest point of the landing area.

Aerodrome reference point The designated geographical location of an aerodrome.

Aerodrome reference temperature

The monthly mean of the maximum daily temperature for the hottest month of the year (the hottest month being that which has the highest monthly mean temperature.)

Aerodrome works Construction or maintenance works carried out at an aerodrome, on or adjacent to the movement area, that may create obstacles or restrict the normal take-off and landing of aircraft.

Aeronautical beacon An aeronautical ground light visible at all azimuths, either continuously or intermittently, to designate a particular point on the surface of the earth.

Aeronautical study An investigation of a problem concerned with some phase of flight and aimed at identifying possible solutions and selecting the one most acceptable from the point of view of flight safety.

Aeroplane reference field length The minimum field length required for take-off at maximum certificated take-off mass, sea level, standard atmospheric conditions, still air and zero runway slope, as shown in the appropriate aeroplane flight manual prescribed by the certificating authority or equivalent data from the aeroplane manufacturer. Field length means balanced field length for aeroplanes, if applicable, or take-off distance in other cases.

Aircraft classification number (ACN)

A number expressing the relative effect of an aircraft on a pavement for a specified standard subgrade category.

Aircraft parking position A designated area on an apron intended to be used for parking an aircraft. Also known as an aircraft stand.

Airside The movement area of an aerodrome, adjacent terrain and buildings or portions thereof, access of which is controlled.

Apron A defined area on a land aerodrome intended to accommodate aircraft for the purposes of loading or unloading passengers, mail or cargo, fuelling, parking, or maintenance.

Balanced field length A field length where the distance to accelerate and stop is equal to the take-off distance of an aeroplane experiencing an engine failure at the critical engine failure recognition speed (V1).

Capacity discharge light A lamp in which high-intensity flashes of extremely short duration are produced by the discharge of electricity at high voltage through a gas enclosed in a tube.

Clearway A defined area at the end of the take-off run available on the ground or water under the control of the aerodrome operator, selected or prepared as a suitable area over which an aeroplane may make a portion of its initial climb to a specified height.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Definitions 22

Critical aeroplane The aeroplane or aeroplanes identified from among the aeroplanes the aerodrome is intended to serve as having the most demanding operational requirements with respect to the determination of movement area dimensions, pavement bearing strength and other physical characteristics in the design of aerodromes.

Critical obstacle The obstacle within the take-off climb area and/or the approach area, which subtends the greatest vertical angle when measured from the inner edge of the take-off climb surface and/or the approach surface.

Declared distances 1. Take-off run available (TORA). The length of runway declared available and suitable for the ground run of an aeroplane taking off. 2. Take-off distances available (TODA). The length of the take-off run available plus the length of the clearway, if provided. 3. Accelerate-stop distance available (ASDA). The length of the take-off run available plus the length of the stopway, if provided. 4. Landing distance available (LDA). The length of runway which is declared available and suitable for the ground run of an aeroplane landing.

Displaced threshold A threshold not located at the extremity of a runway.

Elevation The vertical distance of a point or a level, on or affixed to the surface of the earth, measured from the mean sea level.

Frangible object An object of low mass designed to break, distort or yield on impact so as to present the minimum hazard to aircraft.

Hazard beacon An aeronautical beacon used to designate a danger to air navigation.

Independent parallel departures Simultaneous departures from parallel or near-parallel instrument runways.

Instrument meteorological conditions (IMC)

Meteorological conditions expressed in terms of visibility, distance from cloud, and ceiling, less than the minimum specified for visual meteorological conditions.

Instrument runway One of the following types of runway intended for the operation of aircraft using instrument approach procedures: 1. Non-precision approach runway. An instrument runway served by visual aids and a radio aid providing at least directional guidance adequate for a straight-in approach with a published minimum descent altitude, also known as landing minima for a particular radio aid or a combination of radio aids. 2. Precision approach runway, category I. An instrument runway served by ILS or MLS and visual aids intended for operations with a decision height not lower than 60 m (200 ft) and either a visibility not less than 800 m or a runway visual range not less than 550 m. 3. Precision approach runway, category II. An instrument runway served by ILS or MLS and visual aids intended for operations with a decision height lower than 60 m (200 ft) but not lower than 30 m (100 ft) and a runway visual range not less than 350 m.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Definitions 23

4. Precision approach runway, category III. An instrument runway served by ILS or MLS to and along the surface of the runway and: a. intended for operations with a decision height lower than 30 m (100 ft), or no decision height and a runway visual range not less than 200 m. b. intended for operations with a decision height lower than 15 m (50 ft), or no decision height and a runway visual range less than 200 m but not less than 50 m. c. intended for operations with no decision height and no runway visual range limitations. Note Visual aids need not necessarily be matched to the scale of non-visual aids provided. The criterion for the selection of visual aids is the conditions in which operations are intended to be conducted.

Landing area That part of a movement area intended for the landing or take-off of aircraft.

Manoeuvring area That part of the aerodrome to be used for the take-off, landing and taxiing of aircraft, excluding aprons.

Marker An object displayed above ground level in order to indicate an obstacle or delineate a boundary.

Marking A symbol or group of symbols displayed on the surface of the movement area in order to convey aeronautical information.

MTOW Maximum take-off weight.

Movement Either a take-off or a landing by an aircraft.

Movement area That part of the aerodrome to be used for the take-off, landing and taxiing of aircraft, consisting of the manoeuvring area and the apron(s).

Non-instrument runway A runway intended for the operation of aircraft using visual approach procedures.

Non-precision approach runway See Instrument runway.

Notices to airmen (NOTAMs) A notice issued by the NOTAM office containing information or instruction concerning the establishment, condition or change in any aeronautical facility, service, procedure or hazard, the timely knowledge of which is essential to persons concerned with flight operations.

Obstacles All fixed (whether temporary or permanent) and mobile objects, or parts thereof, that are located on an area intended for the surface movement of aircraft or that extend above a defined surface intended to protect aircraft in flight.

Obstacle limitation surfaces (OLS)

A series of planes associated with each runway at an aerodrome that defines the desirable limits to which objects may project into the airspace around the aerodrome so that aircraft operations at the aerodrome may be conducted safely.

Pavement classification number (PCN)

A number expressing the bearing strength of a pavement for unrestricted operations by aircraft with ACN value less than or equal to the PCN.

Radio aids Also known as non-visual aids. These aids may consist of NDB, VOR, VOR/DME or GPS.

Runway A defined rectangular area on a land aerodrome prepared for the landing and take-off of aircraft.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Definitions 24

Runway end safety area (RESA) An area symmetrical about the extended runway centre line and adjacent to the end of the strip primarily intended to reduce the risk of damage to an aeroplane undershooting or overrunning the runway.

Runway holding position A designated position intended to protect a runway, an obstacle limitation surface, or an ILS/MLS critical/sensitive area at which taxiing aircraft and vehicles shall stop and hold, unless otherwise authorised by the aerodrome control tower.

Runway strip A defined area including the runway and stopway, if provided, intended: 1. to reduce the risk of damage to aircraft running off a runway; and 2. to protect aircraft flying over it during take-off or landing operations.

Runway visual range (RVR) The range over which the pilot of an aircraft on the centre line of the runway can see the runway surface markings or the lights delineating the runway or identifying its centre line.

Shoulders An area adjacent to the edge of a pavement so prepared as to provide a transition between the pavement and the adjacent surface.

Signal circle An area on an aerodrome used for the display of ground signals.

Stopway A defined rectangular area on the ground at the end of the take-off run available prepared as a suitable area in which an aircraft can be stopped in the case of an abandoned take-off.

Switch-over time (light) The time required for the actual intensity of a light measured in a given direction to fall from 50% and recover to 50% during a power supply changeover, when the light is being operated at intensities of 25% or above.

Taxi-holding position See definition of runway holding position and intermediate holding position.

Taxiway A defined path on a land aerodrome established for the taxiing of aircraft and intended to provide a link between one part of the aerodrome from another, including: 1. Aircraft parking position taxilane. A portion of an apron designated as a taxiway and intended to provide access to aircraft parking positions only. 2. Apron taxiway. A portion of a taxiway system located on an apron and intended to provide a through taxi route across the apron. 3. Rapid exit taxiway. A taxiway connected to a runway at an acute angle and designed to allow landing aeroplanes to turn off at higher speeds than are achieved on other exit taxiways thereby minimizing runway occupancy times.

Taxiway strip An area including a taxiway intended to protect an aircraft operating on the taxiway and to reduce the risk of damage to an aircraft accidentally running off the taxiway.

Threshold The beginning of that portion of the runway useable for landing.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Definitions 25

Time limited works Aerodrome works that may be carried out if normal aircraft operations are not disrupted and the movement area can be restored to normal safety standards in not more than 30 minutes.

Touchdown zone The portion of a runway, beyond the threshold, where it is intended landing aeroplanes first contact the runway.

Visibility The ability, as determined by atmospheric conditions and expressed in units of distance, to see and identify prominent unlit objects by day and prominent lit objects by night.

Visual aids May consist of T-VASIS, PAPI, runway markings and runway lights.

Visual meteorological conditions (VMC)

Meteorological conditions expressed in terms of visibility, distance from cloud, and ceiling, equal or better than specified minima.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 26

PART 1

AERODROME INFORMATION

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 27

Sunshine Coast Airport

Aerodrome Manual

Part 1

Section 1

Aerodrome Site

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 28

Part 1 Section 1 Aerodrome Site (a) A plan of the aerodrome showing the main aerodrome facilities, including

the wind direction indicators, for the operation of the aerodrome.

The following plan included as Appendix 1, shows the required data: - Sunshine Coast Airport Aerodrome and Facilities, Boundaries and Location

Plan

(b) A plan of the aerodrome showing the aerodrome boundaries.

The following plan included as Appendix 1, shows the required data:

- Sunshine Coast Airport Aerodrome and Facilities, Boundaries and Location

Plan (c) A plan showing the distance of the aerodrome from the nearest city, town

or other populous area, and the location of any aerodrome facilities and equipment outside the boundaries of the aerodrome. The following plan included as Appendix 1, shows the required data:

- Sunshine Coast Airport Aerodrome and Facilities, Boundaries and Location

Plan (d) Either:

(i) Particulars of title of the aerodrome site; or (ii) If the boundaries of the aerodrome are not defined in the documents

of title – the particulars of the title to, or interests in, the property on which the aerodrome is located and a plan showing the boundaries and position of the aerodrome.

The following plan included as Appendix 2, shows the required data:

• Sunshine Coast Airport Land Ownership Plan

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 29

Appendix 1 Sunshine Coast Airport Aerodrome and Facilities, Boundaries and Location Plan

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 30

Appendix 2 Sunshine Coast Airport Property Land Ownership Plan

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 31

PART 2

AERODROME ADMINISTRATION

AND

OPERATING PROCEDURES

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 32

Sunshine Coast Airport Aerodrome Manual

Part 2

Section 1

Aerodrome Administration

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 33

Part 2 Section 1 AERODROME ADMINISTRATION Particulars of the aerodrome administration including the following:

(i) The organisational structure - the organisation chart for Sunshine Coast Airport Pty Ltd Operations and Assets Group.

(ii) The management positions responsible for the operation and maintenance of the aerodrome

The General Manager Operations & Assets is responsible for:

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 34

• ensuring the airport is operated in accordance with this Aerodrome Manual

• ensuring that the airport complies with the CASA Standards and particularly the Manual of Standards Part 139

• ensuring Technical Inspections are undertaken by suitably qualified and experienced persons as required by CASR 139.230, 139.325 and 139.240

• ensuring that all new and redeveloped facilities constructed/installed are in accordance with the Standards specified in Manual of Standards Part 139

• ensuring that all persons with responsibility for safety and operational functions have had the appropriate training and experience to undertake those functions as required by CASR 139.140 and MOS Part 139, 10.1.3

• ensuring any deviations from the Aerodrome Manual that are made to ensure safety of aircraft are reported to CASA within 30 days

• ensuring that the airport complies with all certification conditions, exemption conditions and any directions issued by CASA

• maintaining access to all necessary documents to ensure the safe operation of the airport

The Airfield Manager is responsible for:

• ensuring that the airport safety officers perform their duties in accordance with the requirements of the Aerodrome manual

• ensuring all persons with responsibility for safety and operational functions have current and up to date licences and authorisations to undertake those functions as required by CASR 139.140 and MOS Part 139, 10.1.3

• ensuring all persons with responsibility for safety and operational functions have access to sufficient resources to effectively meet the requirements of the roles

• maintaining training records for all airport personnel

• ensuring daily serviceability inspections are undertaken by suitably qualified and experienced persons

The Airport Safety Officers are responsible for:

• undertaking daily serviceability inspections

• undertaking minor maintenance to airport facilities as required to ensure serviceability

• monitoring airside vehicle and pedestrian access

• undertaking the functions of a Works Safety Officer during planned and time limited works

(iii) Contact details of the person who is the aerodrome manual controller

The General Manager Operations & Assets is the Aerodrome Manual Controller and the contact details can be found in the Master Contact List in the Introduction Section of this manual. The Aerodrome Manual will be reviewed at least once every 12 months to ensure that all of the particulars relating to Sunshine Coast Airport are current. Any amendments to sections in the manual may require the reissue of the entire section.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 35

If, after the review, no amendments are made CASA will be informed that there were no amendments. CASA may issue directions to amend the Aerodrome Manual. If amendments are prepared, they must be submitted in writing to CASA within 30 days of the amendment being undertaken. The Aerodrome Manual Controller must ensure that a record is kept of who holds copies of the whole or parts of the Aerodrome Manual and must ensure that amendments are distributed to those persons. When amendments are distributed the manual holder must return the obsolete History Amendment Sheet to the Manual Controller as proof of receipt of the amendment. There are controlled copies of this Aerodrome Manual. Refer to Distribution List for this information. SCA Pty Ltd. takes no responsibility for uncontrolled copies.

(iv) Contact details for the main persons responsible for aerodrome operations and safety functions

The contact details for the General Manager Operations & Assets, Airfield Development Manager, Airfield Manager, Airport Safety Officers, and Assets Technical Officer are contained in the Master Contact List in the Introduction Section of this manual.

Conditions, Exemptions, Directions and Variations The General Manager Operations & Assets is responsible for applying for and administering exemptions.

Details of conditions applicable to the aerodrome, if any In accordance with CASR (1998) regulation 139.060, particulars of any condition subject to which the aerodrome certificate has been granted: The Sunshine Coast Airport Certificate is unconditional.

Details of exemptions applicable to the aerodrome, if any In accordance with CASR (1998) regulation 139.020, particulars of any exemption granted to the operator under this regulation: There are no exemptions applicable to Sunshine Coast Airport

Details of directions applicable to the aerodrome, if any The District Aerodrome Inspector has issued the following directions under CASR (1998) regulation 139.105(2): There are no directions issued for Sunshine Coast Airport.

Details of variations applicable to the aerodrome, if any

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 36

The following facilities do not comply with the standards currently published in the CASA Manual of Standards Part 139 – Aerodromes.

Existing Facility Constructed MOS Standard Comments- Expected Compliance

SCAP Apron – Bays 11-13

2014 MOS 139 Section 9.16.2 Apron floodlighting not currently provided (NOTAMed as HJ only). Lighting design in progress. Future requirement to be reviewed based on demand following expansion of RPT Apron.

Illuminated Wind Direction Indicators

Approx. 1980’s

MOS 139 Section 8.7.1.6 and Section 8.7.1.7 – IWDI Siting Requirements.

Not practicable at the time of installation.

RPT Apron Linemarking

December 2018

MOS 139 Section 8.5 Temporary Linemarking on RPT Apron due construction stages of SCAEP Project. These will be replaced by permanent markings as per MOS 139 Section 8.5.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 37

Aerodrome Certificate

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Administration 38

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Emergency Plan 39

Sunshine Coast Airport

Aerodrome Manual

Part 2

Section 2

Aerodrome Emergency Plan

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Emergency Plan 40

Part 2 Section 2 Aerodrome Emergency Plan (AEP) The Sunshine Coast Airport Emergency Plan (AEP) is published and distributed under

separate cover to the Aerodrome Manual.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 41

Sunshine Coast Airport

Part 2

Section 3

Aerodrome Lighting

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 42

Part 2 Section 3 Aerodrome Lighting Lighting facilities at Sunshine Coast Airport are maintained in accordance with the requirements of MOS Part 139. New facilities are designed and installed in accordance with the requirements of MOS Part 139. Where appropriate they will be:

• Checked by an electrical engineer or licensed electrician

• Surveyed by a suitably qualified person

• Flight checked by a CASA approved pilot Details of these checks will be forwarded to CASA for approval and the issue of any permits as appropriate. The maintenance of airport lighting facilities is managed by the General Manager Operations & Assets, Facilities Manager and the Assets Technical Officer where required.

Existing Aerodrome Lighting Facilities Runway Lighting

• Runway 18/36 is fitted with a medium intensity runway lighting system. The system has three stages of intensity.

• Helicopter Landing Site (HLS) Juliet is fitted with a medium intensity lighting system. The system has three stages of intensity.

Taxiway Lighting, Holding Points, and Apron Lighting

• Taxiways B1 and B2 to the RPT apron are lit with blue taxiway edge lighting. The holding points on Taxiways B1 and B2 are fitted with yellow edge hold point lights.

• Taxiway Echo to the Taxiway Mike intersection, Taxiway Mike and the western GA Taxilane are fitted with green centerline lights

• The RPT apron is fitted with blue apron edge lights.

• The system has three stages of intensity. Illuminated Wind Indicator (I.W.I.)

• Two illuminated wind indicators are provided. Apron Floodlighting

• Floodlighting is provided on the RPT and southern GA Aprons and is operated by time clock.

• For after-hours operation, a switch is located on the entry to the baggage make-up area and is normally operated by the Airport Safety Officer. (Turn switch to RPT for 100% output)

• Overnight, the RPT apron lights are left on at a level of 50% of peak output, unless aircraft operations are being undertaken.

• Apron lights may remain at 100% peak output when aircraft are parked on RPT aprons overnight

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 43

Precision Approach Path Indicator (PAPI)

• A double sided PAPI system is provided on approaches to both Runway 18 and Runway 36.

• The system has six stages of intensity.

Runway Threshold Identification Lights (RTIL’s)

• A double sided RTIL system is provided on approaches to both Runway 18 and Runway 36.

• The system has three stages of intensity.

Pilot Activated Airport Lighting Control Equipment (PAL/AFRU) A PAL/AFRU system is provided and controls the following airport lighting facilities: (a) Runway, Taxiway and Apron Edge lights (b) Illuminated Wind Indicators (c) Airport Rotating Beacon (d) PAPI (e) RTIL’s

The above facilities can be manually overridden by a control switch mounted on the outside wall of the baggage breakdown area during an emergency isolating the tower and PAL control. If operated notify Airport Safety Officer immediately on 0419 658 272. Standby Power Generator On mains power failure a 500KVA Generator will start within 15 seconds and supply electrical power to all airfield lighting systems. Miscellaneous Airport Lighting

The following other lighting facilities are provided on or near the airport: (a) An Airport Rotating Beacon, white light. (Airservices Australia responsibility) (b) Obstruction light on Mt Coolum (Flashing – medium intensity). (SCA Pty Ltd.

responsibility) (c) Low Intensity obstruction light on Apron lighting towers (SCA Pty Ltd.

responsibility) (d) Low intensity obstruction light on Crown Castle tower (Crown Castles

responsibility) (e) Obstruction lights full list is located in Part 2, Section 3, Sub section vii.

The Runway and PAPI light systems primary circuit power is supplied through Constant Current Regulators (CCRs). Lighting control and intensity selection is carried out by Lighting Control PLC, (circa 2008). The (PAL/AFRU) unit is a Thorn Airfield Lighting PAL/AFRU, ON 124.4 frequency.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 44

Particulars of the procedures for the inspection and maintenance of the aerodrome lighting (including obstacle lighting) and the supply of stand-by power (if any), including details of the following:

(i) The arrangements for carrying out inspections and the checklist for inspections

All works relating to maintenance and inspections are carried out in accordance with the requirements of MOS Part 139. During Tower hours Air Traffic Control shall be advised before any operational airport lighting equipment is removed from service for maintenance purposes. Air Traffic Control shall be notified of the maintenance duration times and expected unserviceability times. If faults are found during routine maintenance which renders equipment unserviceable, Air Traffic Control shall be notified of the fault and expected unserviceability times. Air Traffic Control shall be advised at the completion of maintenance when equipment is returned to service.

Daily Airport Serviceability Inspections

Daily airport serviceability inspections are carried out as soon as practicable after first light, after significant weather phenomena, or when requested by Air Traffic Control. Refer to Part 2, Section 6 for details. Where a defect is noted and the fault is beyond the scope of the ability of the Airport Safety Officer, the defect is reported to the Assets Technical Officer for repair. Daily Airport Lighting Serviceability Inspections

Daily airport lighting serviceability inspections are carried out by the Airport Safety Officer at last light, on the following airport lighting facilities:

• Runway lights

• HLS Juliet

• Taxiway and Taxilane Centreline lights

• Taxiway Edge lights

• Apron Edge lights

• RPT Apron Floodlights

• PAPI lights

• RTIL’s

• Illuminated Wind Indicators (2)

• Obstruction Lights

• GA Apron Lighting

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 45

The Airport Safety Officer is responsible for recording defects, alignment problems, low lamp output, and faulty colour filters. Results of the inspection are recorded in the appropriate section of the Airport Lighting Daily Check (Appendix 1 – Part A & B). Where unserviceability is noted the fault is reported to Air Traffic Control during Tower hours, and the Asset Technical Officer for corrective action. The Airport Safety Officer will raise NOTAM if required.

Monthly Airport Lighting Technical Inspections

Monthly airport lighting technical inspections are managed by the Assets Technical Officer on the following airport lighting facilities:

• Runway lights

• HLS Juliet

• Taxiway Centreline lights

• Taxiway/Apron Edge lights

• The PAPI system

• The RTIL’s system

• Illuminated Wind Indicators

• The PAALC/AFRU system

• Primary circuits (insulation resistance checks)

• Airport Lighting Control Room equipment

• Standby Power Generator The Assets Technical Officer is responsible for recording defects.

Results of the inspection are recorded on the appropriate section of the Monthly Airport Lighting Technical Inspection check sheet (Appendix 1 – Part C & D). Where a defect is noted, the Assets Technical Officer or if required the General Manager Operations & Assets will arrange for appropriate corrective action.

Quarterly Airport Lighting Technical Inspections Quarterly airport lighting technical inspections are managed by the Assets Technical Officer on the following airport lighting facilities:

• The PAPI System

• RPT Apron and Southern GA Apron Flood Lights The Assets Technical Officer is responsible for recording defects. Results of the inspection are to be recorded on the appropriate section of the Quarterly Airport Lighting Technical Inspection check sheets (Appendices 1 – Part E and F. Where a defect is noted, the Assets Technical Officer or if required the General Manager Operations & Assets will arrange appropriate corrective action.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 46

Half Yearly (6 monthly) Airport Lighting Technical Inspections

Six monthly airport lighting technical inspections are managed by the Assets Technical Officer on the following airport lighting facilities:

• Mount Coolum Obstacle Beacon.

Results of the inspection are to be recorded on the appropriate section of the Airport Lighting Technical Inspection check sheets (Appendix 1 – Part G. Where a defect is noted, the Assets Technical Officer or if required the General Manager Operations & Assets will arrange appropriate corrective action.

Annual Airport Lighting Technical Inspections

Annual airport lighting technical inspections are managed by the General Manager Operations & Assets or his delegate and are conducted by an appropriately qualified person. Annual Airport Lighting Technical Inspections are carried out on the following airport lighting facilities:

• Runway Edge lights

• Runway Threshold lights

• Runway Threshold Identification lights

• HLS Juliet

• Taxiway Centreline lights

• Taxiway/Apron Edge lights

• PAPI

• Illuminated Wind Indicators

• PAALC

• RPT Apron and GA Apron Flood Lights

• Obstruction Lights (including Mt Coolum Beacon)

• Generator (Appendix G)

• Airport Lighting Controls, power supplies and CCRs

The General Manager Operations & Assets or his delegate is responsible for ensuring that defects are appropriately recorded. Results of the inspections are to be recorded on the appropriate section of the Annual Airport Lighting Technical Inspection check sheets (Appendix 2 Part A) Where defects are noted during the inspection, the General Manager Operations & Assets or his delegate will arrange for appropriate corrective action. Annual Airport Lighting Technical Inspection Report The Annual Airport Lighting Technical Inspection Report (Appendix 2 – Part A, B, C, D, E, F, G, H, I and J) is submitted to the General Manager Operations & Assets and identifies any shortcomings and areas for improvement as a result of

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 47

technical and serviceability inspections and includes any plan for corrective action.

(ii) the arrangements for recording the results of inspections and for

taking follow-up action to correct deficiencies

A record of each inspection whether operational performance or technical, denoting any failures of the lighting system is made by the Inspection Officer on the appropriate Airport Lighting Inspection Check Sheet. The Check Sheets and Reports are retained by the Assets Technical Supervisor for a minimum of seven years. Any minor failures, such as broken lenses, are repaired by the Airport Safety Officer and the appropriate Asset Maintenance request form submitted as completed. Where appropriate, the Airport Safety Officer notifies the Assets Technical Officer or the General Manager Operations & Assets of urgent electrical failures. Repairs of airport lighting beyond the scope of the Airport Safety Officer are undertaken by the Assets technical Officer or other appropriately qualified personnel as required. The more significant lighting failures affecting aircraft operations are reported to Airservices Australia NOTAM Office for a NOTAM to be issued.

(iii) the arrangements for switching lights on and off, including back-up

arrangements for pilot-activated lighting

The normal operation of airport lighting facilities is undertaken in accordance with the following procedures: (a) Operations by Air Traffic Control during Tower hours; (b) Operation by a pilot through the PAL/AFRU system outside Tower hours; (c) Manual operation by switches located on the RPT apron; or (d) Operation by the appropriately qualified personnel using local control from

the Airport Lighting Control room for maintenance purposes In the event of failure of the PAL system, manual operation of the runway lighting system can be implemented by the Facilities Manager, Asset Technical Officer or a trained airport staff member from the ALER room. Apron floodlighting can be manually activated by a push button switch mounted on the side of the control panel located on the inside of the south baggage loop in the make-up area. Overnight the RPT apron lights are left on at a level of 50% of peak output.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 48

(iv) the arrangements for carrying out routine maintenance and emergency maintenance

The Airport Safety Officer undertakes minor routine maintenance as required. If minor faults are found corrective action is taken during the Airport Safety Officers hours of duty. Routine maintenance is carried out monthly by the Assets Technical Officer or other appropriately qualified personnel as required. Faults beyond the scope of the ability of the Airport Safety Officer are referred to the Assets Technical Officer or appropriately qualified personnel during business hours. Arrangements for carrying out maintenance are made with Air Traffic Control during Tower hours, and by broadcasting on and monitoring the CTAF(R) frequency after Tower hours. Air Traffic Control staff are to be advised of the unserviceability and the expected duration of the unserviceability. The Airport Safety Officer will issue NOTAM as necessary. Emergency maintenance after hours is carried out by contacting the Assets Technical Officer or other appropriately qualified personnel as may be determined by the General Manager Operations & Assets or his delegate. A minimum holding of the airport lighting maintenance spares are held in the Airport Lighting Equipment Room at Sunshine Coast Airport. The list of spares is checked monthly as part of the Asset Maintenance System by the Assets Technical Officer. The majority of airport lighting maintenance spares are supplied by:

• ADB-Safegate Australia Pty Ltd. Unit 6, 677 Springvale Road

Mulgrave, VIC 3170 Tel: (03) 8545 1600 Fax: (03) 8545 1699

• Airport Lighting Specialists Pty Ltd. PO Box 94 Rosanna, VIC 3084 Tel: (03) 9432 0511 Fax: (03) 9432 1952

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 49

(v) the arrangements for providing secondary power, stand-by power and portable lighting if any and, if applicable, particulars of any other method of dealing with partial or total system failure

Standby power for Runway, HLS Juliet, Taxiway, and Apron Edge lights, IWI’s, PAPI lighting and apron lights, is provided by a diesel generator. The switch over time following a mains power failure is less than 15 seconds.

The standby power generator is owned and maintained by SCA Pty Ltd. Testing is undertaken in accordance with the monthly generator serviceability inspections, and as part of the Annual Airport Lighting Technical Inspection. Airservices Australia own and maintain the NDB, DME (I) and VOR, and Airport Rotating Beacon. The NDB, DME (I) and VOR facilities are supplied with mains power only, with limited battery-operated UPS.

(vi) the titles and roles of the persons who are responsible for the inspection and maintenance of the lighting and the telephone numbers for contacting them during and after working hours The General Manager Operations & Assets has overall management responsibility for the provision of airport lighting facilities and standby power generators. The General Manager Operations & Assets is responsible for planning of future facilities. The inspection and maintenance of aerodrome lighting facilities is undertaken by the Airport Safety Officer and the Assets Technical Officer or other suitably qualified personnel as required. The General Manager Operations & Assets or his delegate will coordinate the technical inspection and maintenance of all airport lighting facilities by appropriately qualified personnel. The Airport Safety Officer is responsible for serviceability inspections and minor maintenance of some lighting facilities. Contact telephone numbers for the General Manager Operations & Assets, Airport Safety Officer and Assets Technical Officer are in the Master Contact List in the Introduction section of this Aerodrome Manual.

(vii) Other relevant information

(a) Obstacle Lighting

The Airport Safety Officer checks the serviceability of lights visible from the airport and records these in his Night Time Daily Serviceability Inspection check sheet every evening.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 50

When an obstacle light becomes unserviceable the Airport Safety Officer issues a NOTAM advising of the unserviceability. A standard form is at Part 2, Section 4, Appendix 1.

The following list identifies obstacles on and in the airport vicinity that have obstruction lighting provided.

Obstacle Name Number of Lights

Location Contact Details

RPT Apron – Floodlight Towers 6 poles 34

lamps

SCA-RPT Apron General Manager Operations & Assets 0417 630 377

Phone Tower - LS Carpark RFNSA No: 4564001

2 SCA-LS Carpark Friendship Ave

Axicom 1800 006 667

Mt. Coolum 1 Summit of MT. Coolum

General Manager Operations & Assets 07 4580 4352

Television Tower-Radar Hill Axicom Business Unit No: 3400584

3 Radar Hill Rd Bli Bli

Southern Cross Television 07 4726 2091

Phone Tower – Telstra Radar Hill RFNSA No: 4560017

1 249 Nambour Connection Road Bli Bli

Axicom 1800 006 667

Phone Tower (Telstra)- Finland Road RFNSA No: 4564003

1 280 Finland Road Telstra 1800 773 080 (Site 57985)

Mudjimba Sports Field Northshore Multi Sports Association

11 Mudjimba Beach Rd Mudjimba

Chairman 07 5451 8814

Phone Tower – Bli Bli RFNSA No: 4560005

1 Whitecross Road Bli Bli

Axicom 1800 006 667

Vodafone Phone Tower – West Coolum Rd RFNSA No: 4573009

1 West Coolum Road

Axicom 1800 006 667

Phone Tower – Mt. Coolum Golf Course RFNSA No: 4573002

1 Mt. Coolum Golf Course. Lumeah Drive, Mt. Coolum

Axicom 1800 006 667

(b) Serviceability Standards

A lighting system is deemed to be on outage when:

• In the case of a lighting system comprising less than 4 lights (e.g.- Taxiway Holding Point lights or Runway Threshold lights), any of the lights become unserviceable.

• In the case of a lighting system comprising 4 or 5 lights (e.g.- IWI lights), more than one light becomes unserviceable.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 51

• In the case of a lighting system comprising 6 to 13 lights (e.g.- Inset Runway Threshold lights), more than 2 lights become unserviceable or 2 adjacent lights become unserviceable.

• In the case of a lighting system comprising more than 13 lights, more than 15% of the lights become unserviceable or 2 adjacent lights become unserviceable.

For the PAPI, the serviceability standards take into account both the number of unserviceable lamps within a light unit, and also the number of light units within the PAPI system. Each light unit comprises two boxes. Each box contains one lamp. A light unit is considered to be on outage when:

• One lamp is unserviceable

• A red filter is unserviceable, missing, or damaged. In this case all of the lights within the affected light unit are to be extinguished until the red filter is rectified. The affected light unit is included as an unserviceable light unit for the PAPI system as a whole

The PAPI system is deemed to be on outage when:

• more than one light unit is unserviceable

(c) Airport Lighting Field Circuit Cable Resistance

The insulation resistance of Airport Lighting Field Circuits is tested monthly by the Asset Technical Officer or an appropriately qualified person. The minimum insulation resistance to earth of any runway, taxiway or PAPI circuit should be in accordance with AS3000: Minimum Insulation Resistance > 1 Meg Ohm Where tests reveal that the resistance to earth of any Airport Lighting Field Circuit is below the minimum standard, repair action should be initiated by the Assets Technical Officer or suitably qualified personnel as required by the General Manager Operations & Assets. Records of tests will be made on the form in Appendix 1 – Part C.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 52

SUNSHINE COAST AIRPORT PTY LTD. Airport Daily Check Sheet

Obstruction Lights and Hazard Beacons

DATE

RPT Apron Flood lights

(6)

Phone Tower LS Car Park (1)

Mt Coolum

(1)

TV Tower-Radar

Hill (3)

Aerodrome Beacon

(1)

Phone Tower-Radar

Hill (Telstra)

(1)

Phone Tower- Finland

Rd (1)

Mudjimba

Sports Field

Lights (11)

Phone Tower-West

Coolum Rd (1)

Phone Tower-Mt. Coolum Golf (1)

Phone Tower – Whitecross Rd

Bli Bli (1)

Initial

Comments

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Appendix 1 – Part A Are all Hazard Lights Operational? Please insert YES or NO If “No” please advise Airfield Manager as soon as possible

YEAR __________________________

MONTH _________________________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 53

SUNSHINE COAST AIRPORT PTY LTD. Airport Lighting Daily Check Sheet

DATE

Wind Socks (IWI)

RPT Apron & Southern GA Apron

Western GA Taxi

lane

Western GA

Parking Apron

Runway Lights

HLS Juliet

RPT Edge lights

Taxi way Mike

Taxi way

Echo

Taxi way

Delta

Taxi way

Juliet

RTIL 18

PAPI 18

RTIL 36

PAPI 36

Initial Comments

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Appendix 1 – Part B Are all Hazard Lights Operational? Please insert YES or NO If “No” please advise Airfield Manager as soon as possible

YEAR __________________________

MONTH _________________________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Lighting 54

This page is intentionally blank.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 55

Appendix 1 – Part C

MONTHLY SERVICEABILITY INSPECTIONS Inspect and run the Generator. Record faults and action taken in appropriate section below. NOTE: SPACES MUST NOT BE LEFT BLANK

MONTHLY GENERATOR INSPECTION AIRPORT LIGHTING GENERATING SET

INSPECTING OFFICER’S

COMMENTS

INSPECTING OFFICER ACTION TAKEN

Check fuel level Full = 500ltrs

Check coolant level

Check oil level

Check starter battery electrolyte levels

Two diesel jerry cans in Container housing

Test and reset Flashing run indicator light (West end)

Record starter battery voltage

Simulated Load Run

Run Time 30 minutes minimum

Load (Amps)

Oil Pr. Water temp Hrs meter

Comments:

Inspecting Officer ______ _______ Date __________ Signature ________________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 56

Appendix 1 – Part D MONTHLY TECHNICAL INSPECTIONS

LIGHTING – Visual check. Inspect and replace lamps if dull, burnt out or unduly blackened. YES NO All light fittings in sound condition and operating normally, incl HLS J

All threshold lights show red and green. (16)

All RTIL’s operating normally (3 or 6 stages) All RTIL’s control and current relay’s operating normally All turning nodes lights show blue. (8)

All taxiway/apron edge lights show blue

All lenses and filters are clean, and inside of fittings free of water

Are windsock frames, plugs, sockets, cords and lights in good condition

PAL YES NO Is PAL/AFRU unit in satisfactory automatic operating condition

Manual operation of PAL/AFRU unit functions correctly

Ambient light detector is operating correctly

SPARES YES NO Are sufficient spares held (as per Maintenance Spares List)

AIRPORT LIGHTING CONTROL ROOM YES NO All relays, CCR’s, modules and monitoring lights through all stages are operating correctly

CIRCUIT CURRENTS / INSULATION RESISTANCE Line currents of all circuits should be tested using the CCR’s in-built meters and any faults should be recorded on the appropriate section of TABLE 1 of this appendix. Insulation resistance of lighting circuits should be tested using the in-built megger and recorded on the appropriate section of TABLE 1 of this appendix.

Copies of this report are kept by the Asset Technical Officer.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 57

Appendix 1 – Part D (continued)

TABLE 1

Circuit Ground Condition

Current (Amps) Stages

Insulation Resistance (M)

RWY Lights 1 2 3

TWY, Apron Edge Lights HLS Juliet (helipad)

1 2 3

18 PAPI 1 2 3 4 5 6

36 PAPI 1 2 3 4 5 6

Control Cct & Relay’s

All light working 8 OFF

Sock condition 5-1 5-new & 1-replace ASAP

Northern IWI

Southern IWI

Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature ___________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 58

APPENDIX 1 – PART E QUARTERLY TECHNICAL INSPECTION

PAPI FIELD TEST REPORT

TICK BOXES TO INDICATE MAINTENANCE / CHECKS COMPLETE

RUNWAY 18

RUNWAY 36

BOX FEET FILTER LEVEL CLEAN BOX FEET FILTER LEVEL CLEAN

A A

B B

C C

D D

E E

F F

G G

H H

Inspecting Officers Comments:

Boxes A and H … 2 degrees 30’ Boxes B and G … 2 degrees 50’ Boxes C and F … 3 degrees 10’ Boxes D and E … 3 degrees 30’

Inspecting Officer ________________ Date ____________ Signature ___________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 59

Appendix 1 – Part F

QUARTERLY TECHNICAL INSPECTION

RPT APRON LIGHTING Number of (34) 400w Metal Halide floodlights operational and in good working order. YES NO Check apron switch “RPT or 50%” for correct operation

1500w back-up floodlights checked for correct operation

Check obstruction lights on rpt apron poles (8 off) Hydraulic ram is in serviceable condition (service annually)

SOUTHERN GA APRON LIGHTING Number of (8) 640w LED floodlights operational and in good working order. Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature ___________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 60

Appendix 1 – Part G Half Yearly Maintenance MT COOLUM BEACON

TOOLS & EQUIPMENT

First Aid kit portable

Compound Keys

Hand tools

Voltage Tester

Rags and Insecticide

CAUTIONS

Isolate solar panel whilst working

Be aware of wind gusts at height

Be careful on walking up walking track where it is uneven

WORK PROCEDURE

Notify tower and safety officer

Park at the bottom of Mt Coolum

Walk to the top of Mt Coolum

Unlock compound gate

Open control box and turn off isolator

Lower tilt pole

Open up light unit

Check for damage

Clean outside of Lens

Check solar panel, aerial and bird spikes

Spray with insecticide where applicable

Check lightning protection

Turn on isolator

Check electrical enclosure

Operate light on Solar panel controller

Check lights function correctly 40-60 flashes per second

Check condition of Compound

Lock compound

Take rubbish back to workshop

Walk carefully down Mt Coolum

Recorded in Airport lighting book at Airport Office

Comments:

COMPLETION OF WORK

Name

Date

Sign

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 61

Appendix 1 – Part H ANNUAL TECHNICAL SERVICE

STAND BY POWER GENERATOR Date Serviced by service person and company

Materials Used Next Change Comments

Oil

Oil test sample

Batteries

Water Additive

Air Filter

Oil Filter

Emergency Stop

Water temp Whilst running for 10 min under load 300 amps

Oil pressure Whilst running for 10 min under load 300 amps

Volts 1 phase Volts 3 phase Hz

Manual Start

Condition report :

Functional Checks (by simulation or operation of the protection device) “After Hours test”

Auto Start (time) <15 sec Auto Start (time) Auto Start (time)

YES

Generator left in ‘Auto’ mode “check indicator run light is OFF”

Comments :

Inspecting Officer __________________ Date __________ Signature ___________ Attach service Report from service person. Appendix 2 – Part A

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 62

ANNUAL TECHNICAL INSPECTIONS

ELEVATED RUNWAY EDGE LIGHTS (60) , RTIL’s (4) AND ELEVATED

THRESHOLD LIGHTS (4) - CONDITION

Inspect lamps, replace if unduly blackened or failed

Inspect glassware lenses, clean or replace as necessary

Inspect lamp holder, repair or replace as necessary

Inspect fitting for mechanical damage, replace as necessary

Check level of fitting, align as necessary

Check azimuth alignment is 15 degrees parallel to the runway edge and elevation of 10 degrees for each light unit

Test the operation of lights – ensure lights are synchronised and flash rate is between 100 – 120 flashes per minute and record

Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature ___________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 63

Appendix 2 – Part B ANNUAL TECHNICAL INSPECTIONS

FLUSH RUNWAY EDGE LIGHTS (3) AND THRESHOLD LIGHTS (12) - CONDITION

Inspect lamps, replace if unduly blackened or failed

Inspect glassware, clean or replace as necessary

Inspect lamp holder, repair or replace as necessary

Inspect base for water entry, repair fitting gaskets or replace fitting as necessary

Inspect base and electrical contacts, clean as necessary

Inspect base for adhesion to pavement surface, record loose base numbers

Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature____________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 64

APPENDIX 2 – PART C ANNUAL TECHNICAL INSPECTIONS

TAXIWAY/APRON (86) LIGHTS, HLS J LEAD IN (3) lights and HLS J (6) lights- CONDITION

Inspect lamps, replace if unduly blackened or failed

Inspect lens, clean or replace fitting as necessary

Inspect lamp holder, repair or replace as necessary

Inspect fitting for mechanical damage, replace as necessary

Check level of fitting, align as necessary

Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature ___________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 65

APPENDIX 2 – PART D ANNUAL TECHNICAL INSPECTION

PAPI SYSTEM RUNWAY 18 - CONDITION

Inspect all light units and ensure grass is clear of light signal area

Clean all light units

Inspect all light unit mounting brackets for damage, replace as necessary

Inspect light units for damage and corrosion, repair or replace as necessary

Ensure that all mountings and blades are secure

Level all light units

Inspect red filters, replace if broken, distorted or faded

Inspect lamps, replace if unduly blackened or failed

Inspect lamp assembly cabling and terminal blocks, repair as necessary

Align light signals

Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature ___________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 66

Appendix 2 – Part E ANNUAL TECHNICAL INSPECTION

PAPI SYSTEM RUNWAY 36 - CONDITION

Inspect all light units and ensure grass is clear of light signal area

Clean all light units

Inspect all light unit mounting brackets for damage, replace as necessary

Inspect light units for damage and corrosion, repair or replace as necessary

Ensure that all mountings and blades are secure

Level all light units

Inspect red filters, replace if broken, distorted or faded

Inspect lamps, replace if unduly blackened or failed

Inspect lamp assembly cabling and terminal blocks, repair as necessary

Align light signals

Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature ___________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 67

Appendix 2 – Part F ANNUAL TECHNICAL INSPECTIONS

ILLUMINATED WIND INDICATOR – NORTH - CONDITION

Inspect plug, socket and cable repair or replace as necessary

Inspect lamps and lamp holders, replace as necessary

Test insulation of flexible light feeder cable

Test insulation of underground feeder cable on primary windsock

ILLUMINATED WIND INDICATOR – SOUTH (Primary) - CONDITION

Inspect plug, socket and cable repair or replace as necessary

Inspect lamps and lamp holders, replace as necessary

Test insulation of flexible light feeder cable

Test insulation of underground feeder cable on primary windsock

Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature____________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 68

APPENDIX 2 – PART G ANNUAL TECHNICAL INSPECTIONS

PAL EQUIPMENT - CONDITION

Test PAL as manufacturers handbook

Test ambient light detector – twilight dark

Inspect aerial and connections

Test output switching functions

Arrange testing of radio receiver by SCA (once per year)

Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature ___________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 69

APPENDIX 2 – PART H ANNUAL TECHNICAL INSPECTIONS

AIRPORT LIGHTING CONTROLS, POWER SUPPLIES AND MAINS

TRANSFORMERS - CONDITION

Check that all terminations are tight

Check for signs of cable heat damage

Check that all indicating lights are operating + Constant Current Regulator (CCR) displays

Check that CCRs are serviceable

Check UPS and swap out with spare every 12 mths

Check output currents on field circuits

Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature ___________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 70

Appendix 2 – Part I ANNUAL TECHNICAL INSPECTIONS

APRON FLOODLIGHTING (RPT & GA) - CONDITION

YES NO

• Inspect RPT Apron Floodlighting switchboard, repair as necessary

• Inspect cabling, plugs, sockets, breakers and terminal blocks in base of high mast poles, repair or replace as necessary

• Inspect light units for damage and corrosion, repair as necessary

• Inspect lamps, replace if unduly blackened or failed

• Inspect lamp assembly cabling, terminal blocks and control gear, repair or replace as necessary

• Ensure light shrouds are firmly fixed (if fitted)

• Clean glass lens

• Measure lighting output levels on RPT bays

• Inspect hinges holding glass lens

• Inspect light units mounting brackets for damage and corrosion, repair as necessary

• Check that all terminations are tight

• Check for signs of heat and vermin damage to cabling

• Check that relays and contactors are serviceable

• Inspect switchboards for weather and vermin proofing

• Inspect cabinets, mountings, hinges and locks for mechanical damage

• Confirm that switchboard schedules are current

• Confirm that switchboard electrical drawings are up to date

• Rectify hot joints identified in latest thermographic survey report

Inspecting Officers Comments:

Inspecting Officer ________________ Date ____________ Signature ___________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 71

Appendix 2 – Part J ANNUAL AIRPORT LIGHTING TECHNICAL INSPECTION REPORT

TYPE OF INSPECTION: Annual Lighting Inspection

PERIOD OF INSPECTION: From: To:

DAILY INSPECTIONS: (Appendix 1 – Part A & B) Sunshine Coast Aerodrome Manual)

COMMENTS:

MONTHLY INSPECTIONS: (Appendix 1 – Part C & D Sunshine Coast Aerodrome Manual)

COMMENTS:

QUARTERLY INSPECTIONS: (Appendix 1 - Part E & F Sunshine Coast Aerodrome Manual)

COMMENTS:

HALF YEARLY INSPECTION: (Appendix 1 – Part G Sunshine Coast Airport)

COMMENTS:

ANNUAL TECHNICAL SERVICE: STAND BY POWER GENERATOR (Appendix 1 – Part H Sunshine Coast Airport)

COMMENTS:

ANNUAL INSPECTIONS: (Appendix 2 – Part A to I Sunshine Coast Aerodrome Manual)

COMMENTS:

INSPECTION OFFICER SIGNATURE: DATE: SIGN:

GENERAL MANAGER OPERATIONS & ASSETS : DATE: SIGN:

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 72

Sunshine Coast Airport Aerodrome Manual

Part 2

Section 4

Aerodrome Reporting

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 73

Part 2 Section 4 AERODROME REPORTING Particulars of the procedures for reporting any changes to the aerodrome information set out in AIP and procedures for requesting the issue of NOTAMS, including details of the following: (i) the arrangements for reporting any changes that may affect aircraft operations to

AIS and local air traffic services and recording the reporting of changes during and outside the normal hours of aerodrome operation

The General Manager Operations & Assets has been appointed as the AIP responsible person. The General Manager Operations & Assets or his delegate is responsible for advising AIS of any permanent changes to published information regarding Sunshine Coast Airport. The General Manager Operations & Assets or his delegate is also responsible for ensuring that Regular Public Transport operators and other aviation organisations regularly operating at Sunshine Coast Airport are provided information prior to it being provided to Airservices Australia if the information being provided changes their operations or procedures.

The Airport Safety Officers (ASO):

(a) Inspects the airport movement area daily using the daily serviceability checklist from Part 2 Section 6 of this manual prior to the first daylight Regular Public Transport (RPT) operation if practicable.

(b) Carries out additional inspections following abnormal weather phenomena such as

heavy or persistent rain, wind, storms, etc. and any other matters that are likely to affect airport serviceability. Air Traffic Control (ATC) may also request additional inspections following a pilot report.

(c) Corrects/reports any changes of aerodrome serviceability immediately where possible.

(d) Reports any changes of aerodrome serviceability to ATC by radio or telephone as

deemed necessary. If these changes occur outside of ATC hours then these changes are reported by email or phone to the NOTAM Office.

Changes to aerodrome serviceability during and outside normal hours of airport operation and any NOTAMS issued by the ASO are recorded in the ASO's Daily Logbook, a printed hard copy filed in NOTAM folder and stored electronically via SharePoint folder. The procedure for issuing a temporary NOTAM is that the information is recorded on the NOTAM request form and emailed to the NOTAM Office (NOF).

(ii) the contact details for the Organisations to which changes are to be reported

Australian NOTAM Office Phone: (02) 6268 5063 E-mail: [email protected]

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 74

Airservices (AIS) Phone: (02) 6268 5468

CASA Aerodrome Inspector Phone: 131 757

(iii) the name of the reporting officer responsible for reporting the changes and the

telephone numbers for contacting him or her during and after working hours

The General Manager Operations & Assets has notified Airservices Australia (ASA) and CASA as per the list at Appendix 2 regarding positions authorised and responsible for notifying aerodrome changes and have been appointed as reporting officers for the airport: The General Manager Operations & Assets or his delegate is responsible for ensuring that all personnel that are appointed are trained in accordance with MOS Part 139. The contact telephone numbers for the positions are in the Master Contact List in the Introduction Section of this Aerodrome Manual.

(iv) the arrangements for reporting changes of aerodrome information published in AIP to AIS and CASA

The General Manager Operations & Assets has been appointed as the AIP responsible person. The General Manager Operations & Assets is responsible for advising AIS of any permanent changes to published information regarding Sunshine Coast Airport. The General Manager Operations & Assets or his delegate is also responsible for ensuring that Regular Public Transport operators and other aviation organisations regularly operating at Sunshine Coast Airport are provided information prior to it being provided to Airservices Australia if the information being provided changes their operations or procedures. Changes notifiable to Airservices are as per the occurrences listed in the Manual of Standards Part 139 Chapter 10.

Immediate or temporary changes notified to Airservices NOTAM Office will generally be by NOTAM. (A NOTAM form is at Appendix 1 of this section).

Permanent change notifications are also made by NOTAM to the NOTAM office. The Australian NOTAM Office is the designated reporting centre for Sunshine Coast Airport. Copies of all NOTAMs issued are to be kept on file in the Airport Safety Officer’s office.

Changes to the airport notifiable to CASA include, but are not limited to, the following:

• any changes to the physical layout of the airport, and

• obstacles exceeding 110 metres in height (v) the arrangements for keeping records of reports made

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 75

All issues reportable to CASA and AirServices Aeronautical Information Services are to be recorded. A NOTAM is issued and viewed via NAIPS on AirServices website by an authorised NOTAM provider. The General Manager Operations & Assets is responsible to ensure that the records are maintained by the Airfield Manager for a minimum of three years.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 76

Appendix 1

On Following Page

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 77

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Reporting 78

Appendix 2 REPORTING OFFICERS The following persons at Sunshine Coast Airport have been appointed as authorised NOTAM providers:

1. Frank Mondello 2. Adrian Bannister 3. Craig Roberts 4. John Moloney 5. Lewis Noble 6. Randy Atkinson 7. Mark Davies 8. Candi Doel 9. Barry Synott 10. Ken Blair 11. Scott Buist

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Unauthorised Entry to Aerodrome 79

Sunshine Coast Airport Aerodrome Manual

Part 2

Section 5

Unauthorised Entry to Aerodrome

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Unauthorised Entry to Aerodrome 80

Part 2 Section 5 Unauthorised Entry to Aerodrome Introduction

SCA Pty Ltd. is obligated to develop and maintain a Transport Security Program (TSP) under the Aviation Transport Security Act 2004 and the Aviation Transport Regulations 2005. The airport has been declared a security controlled airport and is regulated by the Department of Infrastructure. Access from landside to airside of the airport is strictly controlled and airline staff escort passengers to and from Regular Passenger Transport (RPT) aircraft.

Particulars of the procedures for preventing the unauthorised entry of persons, vehicles, equipment, plant or animals, or other things that may endanger aircraft safety, into the movement area, including details of the following:

(i) the arrangements for controlling airside access

• No persons are permitted airside without lawful excuse. • The RPT apron and other restricted areas can only be accessed by persons holding a

valid aviation security identification card (ASIC) or accompanied and escorted by a person holding an ASIC and be issued with a visitor identification card (VIC).

• The airport perimeter is fenced with a 2.1m to 2.4m high security fence for its entire

length. The CBS area has a colour bond fencing as a physical barrier to prevent unauthorised access airside, and is colour bond to minimise passenger sighting of the CBS process. A risk assessment has been undertaken prior to installation of the colour bond fencing.

• All access points are locked with keys, proximity cards or chains and padlocks. • “Security Restricted Area” and "Airside Area" signs are placed at all points of entry to

the airside. • On the perimeter fence, “Airside Area” signs are placed at regular intervals. • Vehicle access airside is controlled through the provisions of the Airside Vehicle Control

Handbook.

Note: More specific information is located in the Sunshine Coast Airport Pty Ltd. TSP. The TSP has a restricted circulation.

Airport fixed base operators can have vehicular access on a limited basis by application for an access key to the General Manager Operations & Assets or his delegate. The General Manager Operations & Assets or his delegate vets applicants before any access key is issued. Individual aircraft operators do not have vehicular access to the airport “airside” unless they have a contractual lease arrangement with Sunshine Coast Airport Pty Ltd. for hangar facilities, or similar, at Sunshine Coast Airport.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Unauthorised Entry to Aerodrome 81

The Airport Safety Officer monitors airport vehicular and pedestrian access and general security whilst on duty. RPT, charter and private aircraft operators are responsible for controlling access of passengers to and from their aircraft. The Office of Transport Security conducts audits and inspections.

(ii) the names and roles of the persons who are responsible for controlling access to the movement area and the telephone numbers for contacting them during and after working hours

The General Manager Operations & Assets, Airfield Manager and Airport Safety Officers are primarily responsible for controlling access to the movement area. Their contact telephone numbers are in the Master Contact List in the Introduction Section of this Manual. However, other organisations have vital roles in ensuring appropriate access controls are maintained.

Sunshine Coast Airport Pty Ltd.

The Chief Executive Officer has overall responsibility for airport security and for the control of airside access to the airport. The Chief Executive Officer has established an Airport Security Committee and has delegated the General Manager Operations & Assets as chairperson of that Committee. The General Manager Operations & Assets is responsible for developing a Transport Security Program for approval by the Office of Transport Security. The Airfield Manager and Airport Safety Officers are responsible for the implementation of those aspects of the Transport Security Program that control access to the security areas of the airport.

Domestic airlines In accordance with the Aviation Transport Security Regulations 2005, licensed domestic and international airlines are required to develop and implement an Aviation Transport Security Program approved by the Office of Transport Security. This program details procedures to protect passengers, crew and aircraft from acts of unlawful interference. Each plan also makes provisions for intending passengers and their carry-on baggage to be security screened. Airline operators Other airline operators are also responsible for prevention of unauthorised access via any sector of the airport under their direct control, e.g. passenger terminals, aircraft hangars, workshops, buildings and licensed aprons. Airport tenants Airport tenants and lessees are responsible for controlling access to restricted areas via their buildings and/or leased areas.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Unauthorised Entry to Aerodrome 82

Sunshine Coast Airport Aerodrome Manual

Part 2

Section 6

Aerodrome Serviceability Inspections

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Serviceability Inspections 83

Part 2 Section 6 Aerodrome Serviceability Inspections

Particulars of the procedures for carrying out aerodrome serviceability inspections, including details of the following:

The General Manager Operations & Assets is responsible for:

• Ensuring the ASO’s are trained to conduct serviceability inspections;

• Arranging for supplementary technical inspections, if required.

The Supervisor Operations is responsible for:

• ensuring that the airport safety officers perform their duties in accordance with the requirements of the Aerodrome manual

• ensuring all persons with responsibility for safety and operational functions have current and up to date licences and authorisations to undertake those functions as required by CASR 139.140 and MOS Part 139, 10.1.3

• ensuring all persons with responsibility for safety and operational functions have access to sufficient resources to effectively meet the requirements of the roles

• ensuring daily serviceability inspections are undertaken by suitably qualified and experienced persons

The Airport Safety Officers are responsible for:

• conducting daily serviceability inspections;

• recording the results of inspection in the Daily Serviceability Checklists;

• arranging any NOTAM, if required following inspections;

• reporting outcomes of inspection to outside organisations, if required;

• Arranging for immediate remediation of any unserviceable facilities found during the daily serviceability inspections.

(i) the arrangements for carrying out the inspections during and after working hours

The person responsible for conducting the serviceability inspection is the Airport Safety Officer (ASO). There are several trained Airport Safety Officers who meet the standards as required in MOS Part 139. All inspections are in accordance with the requirements of MOS Part 139.

An airport management representative is on call 24 hours per day and will respond to any incidents reported.

(ii) details of the intervals at which the inspections are carried out and the times of the inspections

Aerodrome serviceability inspections are carried out:

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Serviceability Inspections 84

• as practicable before the first RPT operation each day of the week or at the normal commencement of duty of the ASO whichever occurs first;

• after unusual weather phenomena, such as heavy rainfall or severe storms etc;

• additional inspections may be carried out following requests from Air Traffic Services (ATS), Airlines or the District Aerodrome Inspector (DAI).

The standard form used is at Appendix 1.

(iii) the arrangements for keeping an inspection log and the place where it is kept The Daily Serviceability Checklist is used and maintained by the Airport Safety Officer. The checklist is kept in the Airport Safety Officer’s office. Any activity requiring reporting is reported to the Airfield Manager who may escalate the matter to the General Manager Operations & Assets for review if required and endorsement and returned to ASO office for filing. The information contained in the Daily Serviceability Checklist includes: (a) The facilities inspected; (b) Weather details at the beginning of shift and any significant changes in weather such

as heavy rain, high winds or reduced visibility; (c) Bird strikes or any other unusual occurrence, e.g. unauthorised movement of persons,

vehicles or plant on the movement area, aircraft incidents or accidents, etc; (d) Location of substandard conditions that require attention, and a note of action taken; (e) Objects including bird and animal remains found on the movement area; (f) New obstacles detected; (g) Any problems with runway, taxiway and apron surfaces; Unserviceability or any other condition of concern that has been detected is noted on the Daily Serviceability Checklist with a description of the action taken. The Airport Safety Officer is required to sign the Daily Serviceability Checklist after each inspection. Daily Serviceability Checklists records are maintained by the Airfield Manager for at least seven years.

(iv) details of the inspection checklist

Airport Safety Officers inspect airport lighting equipment for lamp outages, broken light filters, damaged fittings and any other problem. Test the PAL /AFRU and ensure that it switches airport lighting equipment “ON”, and cycle time including flashing lights. The Sunshine Coast Airport Daily Serviceability Inspection Checklist is at Appendix 1.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Serviceability Inspections 85

(v) the arrangements for communicating with air traffic control during the inspections

Sunshine Coast Airport is an Air Traffic Controlled airport generally between the hours of 07:30 and 19:40 daily, although these times can change with short notice. During inspections when the Tower is operating, the Airport Safety Officer communicates with the Sunshine Coast Tower on 124.4 Mhz. Outside of Tower hours a radio listening watch is kept on Sunshine Coast Aerodrome CTAF-R 124.4 Mhz. Brisbane ATS can be contacted by Radio (Frequency 129.0 Mhz) on the ground outside of Tower hours or by telephone. The Airport Safety Officers, Airfield Manager and the General Manager Operations & Assets hold an Aeronautical Radio Operator Certificate issued by CASA. Sunshine Coast Airport has an Aerodrome Frequency Response Unit (AFRU) plus Pilot Activated Lighting (PAL) in operation outside of Tower hours to advise pilots that their radios are working on the correct frequency. The features of the unit are as follows: (a) When the aerodrome traffic frequency has not been used for the past five (5) minutes,

the next transmission over three (3) seconds in length will cause a voice identification message to be transmitted in response, i.e. “SUNSHINE COAST AERODROME”.

(b) When the airport traffic frequency has been used within the previous five (5) minutes,

a 300 millisecond tone (an audible “beep”) will be generated after each transmission over three (3) seconds in length.

(c) A series of three microphone clicks within a period of three seconds will activate the

airport lighting. (d) In the event that the transmitter in the frequency response unit becomes jammed for a

period of greater than one minute, the unit will automatically shut down.

(vi) the arrangements for reporting the results of the inspections and for taking prompt follow-up action to ensure correction of unsafe conditions

Whenever a hazardous condition occurs at the airport, the Airport Safety Officer is required to take appropriate action including closing the affected area of the airport, if required and setting out the appropriate markers as detailed in MOS Part 139 – Aerodromes. The Airport Safety Officer will arrange follow-up action or remedial works as a result of the inspection. These works are to be effected immediately, if required, or as soon as is practical for works not impacting aircraft safety. Reporting the results of the inspection when reporting to outside organisations will be in accordance with Section 4 of this Aerodrome Manual. If the inspection reveals a major defect in the pavements and/or drainage, this will be reported to the General Manager Operations & Assets who may instigate a Technical Inspection by a technically competent person.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Serviceability Inspections 86

Similarly, the Airport Safety Officer is required to advise the General Manager Operations & Assets of any maintenance work considered necessary to avoid a potentially hazardous condition developing.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Serviceability Inspections 87

(vii) the names and roles of the persons who are responsible for carrying out the inspections and the telephone numbers for contacting them during and after working hours The General Manager Operations & Assets ensures that Serviceability Inspections are conducted. The Airfield Manager ensures that the inspections are carried out to the appropriate standard and the Airport Safety Officers are responsible for conducting serviceability inspections. The contact telephone numbers of the General Manager Operations & Assets, Airfield Manager and Airport Safety Officers are contained in the Master Contact List in the Introduction Section of this Manual.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Serviceability Inspections 88

Appendix 1 SUNSHINE COAST AIRPORT – DAILY SERVICEABILITY INSPECTION CHECKLIST

DATE

..……../….……/……....

TIME OF INSPECTION: #1 _____________________ (am) #2 _____________________ (pm)

WEATHER: #1 _______________________ (am) #2 _______________________ (pm)

INSPECTION #1 (am) INSPECTION # 2 (pm) Facility Yes No Notes Yes No Notes

Runways: Are Pavements clean and clear?

Any rutting, scouring or drainage problems?

Are there any obstacles or holes within the gable marker (runway strip) line?

Runway 18/36 Runway Lights: Do lights activate on the PAALC?

Are any lights broken?

Are all cones and/or gables in good condition?

Runway Obstacles: Are there any obstacles for take-offs to the North?

Are there any obstacles for take-offs to the South?

Are there any new obstacles along the sides of the runway strip?

Windsocks (all): Are the windsocks in good condition and swinging freely and lit?

Wildlife Hazards: Are any birds or other wildlife present? (make note of harassment activity)

Security: Is there any sign of unauthorised entry?

Taxiways: Are pavements clean and clear of debris?

Is there any surface softness or excessive grass height?

Any rutting, scouring or drainage problems?

Are edge lights working?

Taxiway Strips: Are strips clean & clear of debris?

Aprons: Are aprons clean and clear?

Unserviceable Areas: Are any US areas correctly marked?

Equipment: Is all equipment parked correctly?

NOTAM: Are required NOTAMs current?

AFRU: Is it serviceable?

Overall Serviceability: Do any items require NOTAM to be issued?

NOTE: ANY ADDITIONAL COMMENTS ARE TO BE NOTED ON REVERSE OF THIS FORM

#1 Reporting Officer: ______________(Name in Block Letters) Signature: _________________ #2 Reporting Officer: _____________ (Name in Block Letters) Signature: ______________

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Unauthorised Entry to Aerodrome 89

Sunshine Coast Airport

Part 2

Section 7

Aerodrome Technical Inspections

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Technical Inspections 90

Part 2 Section 7 AERODROME TECHNICAL INSPECTIONS

Particulars of the procedures for carrying out aerodrome technical inspections, including details of the following:

(i) the items that need to be technically inspected and when the inspections are to be carried out

Each facility requiring inspection must be inspected at intervals not exceeding 12 months. The inspections do not have to be conducted concurrently. A partial Technical Inspection may be required after a problem is found during a Serviceability Inspection.

The Technical Inspection shall include the following: (a) an instrument survey of the approach (b) an inspection and testing of the airfield lighting and electrical reticulation systems,

including the visual approach slope indicator system

(c) an inspection and assessment of the movement area pavements and drainage

(d) inspection of signs on the movement area (e) an inspection of facilities at the airport used for:

• airport emergencies

• the handling of hazardous materials

• wildlife hazard management; and

• stand-by and emergency aerodrome lighting

(f) an inspection of the airside vehicle control arrangements (g) a check of the currency and accuracy of:

• aerodrome information published in AIP; and

• the procedures specified in the Sunshine Coast Airport Aerodrome Manual

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Technical Inspections 91

(ii) the arrangements for technically qualified people to carry out the technical inspections

The qualifications of the persons conducting the inspections for:

• The movement area, other pavements and drainage must be inspected by a person who has a recognised degree, diploma or certificate in civil engineering or appropriate technical experience.

• The lighting and electrical facilities must be inspected by an electrical engineer or a licensed electrician.

• The Obstacle Limitation Surfaces must be inspected by a person who is technically qualified or experienced in surveying. They must also have a sound knowledge and understanding of the standards and survey procedures for Obstacle Limitation Surfaces.

• The information published in the AIP, the procedures published in this Manual and the facilities listed in (e), (f) (g) and (h) in item (i) above could be inspected by a person with ISO 9000 audit training and/or is a person approved by CASA to undertake Safety Inspections (ref CASR 139.320); or an experienced person appointed by the General Manager Operations & Assets.

The General Manager Operations & Assets or his delegate will arrange for appropriately qualified inspectors to undertake each part of the Technical Inspection and will record their credentials and obtain copies of their qualifications. These records must be available for CASA to inspect during a routine audit.

(iii) the arrangements for recording the results of the inspections and for taking prompt follow-up action to ensure correction of defects

Each inspection report shall include a list of corrective actions addressing any non- compliances and recommendations on ways of improving the facility. The General Manager Operations & Assets shall ensure that each corrective action, if concerning non-compliance, is addressed. Recommendations can either be implemented or rejected, depending on parameters decided by the General Manager Operations & Assets. Appropriate documentation will be maintained. The General Manager Operations & Assets shall maintain a copy of each report on file for at least three years.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Works Safety 92

Sunshine Coast Airport

Part 2

Section 8

Aerodrome Works Safety

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Works Safety 93

Part 2 Section 8 AERODROME WORKS SAFETY

Aerodrome Works means: Construction or maintenance works carried out at an aerodrome, on or adjacent to the movement area, that may create obstacles or restrict the normal take-off and landing of aircraft. Installation of new facilities and maintenance of existing facilities will be carried out in accordance with the requirements of MOS Part 139. All aerodrome works will be carried out in accordance with MOS Part 139.

• NOTAMs will be issued not less than 48 hours before commencement of aerodrome works under a Method of Working Plan (MOWP) or 24 hours for time limited works.

• Duties of the Works Safety Officer (WSO) will be in accordance with MOS Part 139, Section 10.12.

Works can be carried out on the following basis:

• Time limited works. Where aircraft operations are not disrupted, and the operational

serviceability of the Airport can be restored within 30 minutes, (NOTAM is required if recall is greater than 10 minutes).

• Method of Working Plans. The Airport operator must not carry out works other than time limited works without a Method of Working Plan unless the Airport has been closed for the works or the works are defined as ‘unscheduled’ or emergency works, or the works do not impact the operations of the aerodrome in accordance with MOS 139.

Works within runway strips will be conducted in accordance with the requirements in MOS Part 139, Section 10.10.12.

Particulars of the procedures for planning and safely carrying out aerodrome works (including works that may have to be carried out at short notice), including details of the following:

(i) the preparation of a method-of-working plan identifying areas of the aerodrome affected during each stage of the work and steps taken to ensure safety standards are met

The person responsible for planning and executing aerodrome works is the General Manager Operations & Assets or his delegate and/or the Airfield Manager/Airport Safety Officers who will ensure that the aerodrome works do not create a hazard to aircraft.

The General Manager Operations & Assets will appoint the Airport Safety Officers as Works Safety Officers in accordance with MOS Part 139, Section 10.10.7 and will ensure that they are trained to undertake the functions as described in MOS Part 139, Section 10.12. The supervisor Operations will ensure that the Works Safety Officers have sufficient resources to effectively carry out the duties and that all licencing and authorisations applicable are current.

An MOWP is a document which provides formal advice to the aviation industry and other involved parties, regarding the planned arrangements for the conduct of aerodrome works (other than time limited works). In particular, an MOWP advises of restrictions placed on aircraft operations and on the works organisation as a consequence of the works. The

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Works Safety 94

General Manager Operations & Assets is responsible for ensuring the preparation and approval of a MOWP. The MOWP if required, is generally developed by the Airfield Manager.

The MOWP will include a drawing depicting chainages on the runway for a displaced threshold if required. This will include the equipment limit line (witches’ hats), the temporary runway end (red and white u/s cones) and the displaced threshold (marked by white ‘vees’) as required. The format for producing an MOWP can be found at MOS Part 139, Section 10.11. All work on airport facilities will be undertaken to the standard determined by MOS Part 139. When a work site interrupts an airside fence, temporary fencing shall be erected to restrict access to airside.

On the completion of works the Works Safety Officer will ensure that all operational areas are reinstated to the serviceability standards as specified in MOS Part 139, prior to declaring the areas available for aircraft operations. All pavements are to be free of foreign object debris (FOD). The Airfield Manager will ensure that the appropriate handover checklists have been completed prior to returning the facility to service.

(i) the distribution list for the method-of working plan

A Master distribution list is held on the MOWP file in the Airport Safety Officer office. A typical distribution list could include:

1. Chief Executive Officer 2. General Manager Operations & Assets 3. Airfield Development Manager 4. Airfield Manager 5. Airport Safety Officer and Works Safety Officer 6. Works Organiser / Superintendent 7. Works Project Manager 8. Facilities Manager 9. CASA District Aerodrome Inspector 10. Air Traffic Control - Tower 11. Airservices Australia - NOTAM Office 12. Airservices Australia - ARFFS 13. Jetstar 14. TigerAir (if required) 15. Virgin Australia 16. Alliance Airlines 17. QantasLink 18. Air New Zealand 19. Corporate Air 20. Swissport (Ground Handling Company) 21. Royal Flying Doctor Service 22. RAAF 23. Fixed Base Operators (FBO) 24. Flight Training Organisations 25. Helicopter Operators 26. Airport Refueller 27. Copies of this MOWP will also be distributed to all managers and superintendents of

the Contract Works.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Works Safety 95

The MOWP is distributed electronically and the email distribution list (as required under CASR 139.095 (a) (ii) – Appendix 1(h) (ii & iii)), is maintained and kept by the Airfield Manager. To update details and/or to be included in this distribution list, contact 07 4580 4352 or email [email protected].

(i) the arrangements for telling aircraft operators and other aerodrome users of the method-of-working plan and the telephone numbers for contacting those operators and users during and after working hours

The list of aircraft operators and aerodrome users are in the Master Contact List in the Introduction Section of this Aerodrome Manual. The contact details of operators and aerodrome users who are to be notified of airport works are included in the MOWP email distribution list mentioned above.

(i) the arrangements for communicating with air traffic control and aircraft during the carrying out of the works

Air Traffic Control services are usually provided at Sunshine Coast Airport between 07:30hrs and 19:40hrs. During all works affecting the manoeuvring area, continuous radio contact (listening watch) is maintained by the Works Safety Officer (for time limited works and all MOWP) with the duty Air Traffic Controller. The Works Safety Officer will establish telephone communications with ATC Brisbane outside the normal operational hours of the Sunshine Coast Airport ATC Tower, if required.

(i) the arrangements for carrying out time-limited works

Time limited works will be supervised by an Airport Safety Officer. Time limited works include such works as:

• Maintenance of markings/markers and lights

• Grass cutting within the movement areas and the obstacle limitation surface (OLS)

• Sweeping and minor repairs to movement area pavements

• Painting of runway and taxiway markings

• Surveys and inspections on, or adjacent to, movement areas

Time limited works are not permitted to be carried out at night or when visibility is less than 5 kilometres, except with the approval of Sunshine Coast Air Traffic Control (i.e. – during Tower Controlled Hours) or where normal safety standards can be restored to allow aircraft to operate without delay. Where more than 10 minutes, but less than 30 minutes, is required to restore normal safety standards, at least 24 hours prior notice of the work is required by way of a NOTAM giving details of start time and the time required to restore normal safety standards.

Time limited works are required to cease, and normal safety standards restored:

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Works Safety 96

• when necessary to allow an aircraft to operate, and

• at least 5 minutes before the scheduled or notified time of an aircraft operation

Time limited works that have ceased to permit aircraft operations to take place may be resumed:

• immediately after the aircraft arrival (if work stopped for an inbound aircraft) and the work does not jeopardize the safety of the aircraft;

• 15 minutes after the aircraft departure (if work stopped for a departing aircraft);

• 30 minutes after the scheduled or notified time of aircraft arrival (if work stopped for an expected arrival, which did not eventuate).

(vi) the names, telephone numbers and roles of the persons and organisations responsible for planning and carrying out the works, and the arrangements for contacting those persons and organisations at all times

The General Manager Operations & Assets or his delegate is responsible for:

• Carrying out all planning for major projects at the airport

• Determining if an MOWP is required for the works where any doubt exists

• Ensuring that the Airport Safety Officers/Works Safety Officers are suitably trained and appointed as required by CASR Part 139

• Following up on any incident report that occurred during works, investigate the circumstances and take corrective action to minimise the risk of reoccurrence.

The Airfield Manager is responsible for:

• Develop the Method of Working Plan when required

• Arranging any notification required including NOTAM, if required

• Ensuring that the airport safety officers perform their duties in accordance with the requirements of the Aerodrome Manual

• Ensuring suitable resources to provide WSO functions to facilitate the works

The Airport Safety Officers are responsible for:

• Carrying out or supervising minor projects within the movement area

• Planning and executing minor Time Limited Works

• reporting any incident or damage to facilities likely to affect the safety of aircraft operations immediately to the Airfield Manager or General Manager Operations & Asset during works

The contact telephone numbers are in the Master Contact List in the Introduction Section of this Aerodrome Manual.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Aerodrome Works Safety 97

Appendix 1 EXAMPLE OF A MOWP TITLE PAGE MOWP: YBSU-18/01

Issue No.

Date of Issue

Amendment No.

Date of Amendment

METHOD OF WORKING PLAN AERODROME ……………………………………………………. PROJECT DESCRIPTION ……………………………………….

Date of approval of MOWP ……………………….

Date of commencement of works ……………….

Date of completion of works ………………………

Date of expiry of MOWP ………………………….

CONTENTS: PAGE 1. Title Page 2. Works Information 3. Restrictions to Aircraft Operations 4. Restrictions to Works Organisations 5. Administration 6. Authority 7. Drawings 8. Distribution List

Initial Issue: February 2006

Updated: Februaryy 2019

Version: 1.4

Airside Vehicle Control 98

Sunshine Coast Airport

Part 2

Section 9

Aircraft Parking Control

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Airside Vehicle Control 99

Part 2 Section 9 Aircraft Parking Control

Particulars of the procedures for aircraft parking control, if established, including details of the following:

(i) the arrangements between air traffic control and apron management

Air Traffic Control services are generally provided at Sunshine Coast Airport between 07:30hrs and 19:40hrs daily. Regular Passenger Transport (RPT) jet aircraft have allocated bays immediately to the east of the main terminal building and are self-regulating. Itinerant aircraft above 5,700 kg must obtain prior approval from the General Manager Operations & Assets, Airfield Manager or Airport Safety Officer at least 48 hours prior to the aircraft arriving at the airport. Air Traffic Control is advised of the itinerant aircraft movement. Aircraft below 5,700 kg are not permitted on the main RPT apron and a note in ERSA advises pilots of this restriction. Air Traffic Control will ensure that these aircraft adhere to this restriction. There are two paved areas available for aircraft below 5,700 kg. Tie down cables are available for use on the southern apron. Some grass areas are also available for itinerant aircraft parking. Limited parking facilities are available for rotary winged aircraft and are marked by blue cones.

(ii) the arrangements for allocating aircraft parking positions

The aircraft parking positions marked on the RPT apron at Sunshine Coast Airport (Appendix 1) include the following markings:

• Apron parking and taxiway markings

• Aircraft parking clearance lines

• RPT Parking bay designated numbers

• Maximum aircraft size designations After consultation with the airlines operating at the time of preparation of the plan, a design is prepared based on their operational requirements and the standards in MOS Part 139. An aviation specialist service provider with extensive knowledge of aircraft operations and blast protection requirements will generally prepare the design. Any plans prepared will also indicate what restrictions apply to each parking position by aircraft type. A review of the RPT parking layout will be instigated if circumstances, traffic density and/or aircraft types change. Itinerant aircraft require parking approval prior to operating at Sunshine Coast Airport. Details of itinerant aircraft parking approvals are recorded electronically.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Airside Vehicle Control 100

(iii) the arrangements for initiating engine start and ensuring clearances for aircraft push-back

Pilots are responsible for ensuring adequate clearance during engine start-ups. Aircraft push-backs do not occur as all positions are currently free moving positions.

An aircraft ground running and test area is provided at Sunshine Coast Airport for GA operators. This area is located on Taxiway Echo (alternative run-up area is located at southern end of TWY Delta with prior approval from AD Operator). For RPT aircraft ground running tests are conducted either on the RPT apron or on the Runway end nodes of RWY 18/36.

(iv) an inventory and description of the activation and deactivation of any visual docking guidance system used at the aerodrome

Not applicable. None provided.

(v) the marshalling service

RPT aircraft operating into the airport are marshalled into their parking position by airline/ground handling organisation staff. SCA Pty Ltd does not marshal aircraft.

(vi) the leader (van) service or follow-me service

The Airport Safety Officer will provide a follow-me service on request. This follow me service will only be provided on a centre line escort basis unless approved by the General Manager Operations & Assets or in an emergency situation.

(vii) the names, telephone numbers and roles of the persons responsible for

planning and implementing aircraft parking control

The General Manager Operations & Assets, the Airfield Manager and the Airport Safety Officers are responsible for planning, implementing and monitoring of aircraft parking control. Their contact telephone numbers are in the Master Contact List in the Introduction Section of this Aerodrome Manual.

The General Manager Operations & Assets or his delegate is responsible for:

• planning and implementing any changes to the aircraft parking layout

• ensuring that engine jet blast and prop wash is taken into account when locating parking positions

The Airport Safety Officers are responsible for:

• monitoring aircraft parking to ensure that the RPT apron is maintained clear of itinerant aircraft

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Airside Vehicle Control 101

Appendix 1 - RPT APRON MARKING & USABILITY PLAN

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Airside Vehicle Control 102

Sunshine Coast Airport

Part 2

Section 10

Airside Vehicle Control

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Airside Vehicle Control 103

Part 2 Section 10 Airside Vehicle Control If particulars have been established at the aerodrome for the control of surface vehicles operating on or near the movement area, particulars of those procedures, including details of the following:

(i) the applicable traffic rules (including speed limits) and the means of enforcement of the rules

The traffic rules for the airside areas of Sunshine Coast Airport are issued in the Airside Drivers Handbook. All persons requiring entry to the airside of the airport in a vehicle will require a current Airside Drivers Authority (ADA) or be escorted by a driver with a current ADA. A copy of the Airside Drivers Handbook is issued to all current holders of ADA. NOTE: In accordance with CASR 139.100(3), the Sunshine Coast Airport Airside Vehicle Control Handbook (‘Handbook’), is an independent document to the Aerodrome Manual, is kept electronically and is available on the Airport website. It sets out the rules and procedures that control vehicles and drivers on the airside. Vehicles must be in a roadworthy condition and have adequate accident insurance. Approved vehicles are issued with an Airside Vehicle Permit. The person responsible for developing and implementing airside vehicle control procedures is the General Manager Operations & Assets or his delegate. The person responsible for testing and authorising drivers and monitoring airside vehicle control is the Airport Safety Officer. Records of Airside Drivers Authority are maintained by the Airfield Manager and kept on file in the SCA Pty Ltd. Management Office. Speed limits for vehicles operating on the Airport are: - 10 km/hr within 15 metres of an aircraft - 15 km/hr on apron areas - 25 km/hr elsewhere on the movement area - 40 km/hr on perimeter roads unless sign posted Airside vehicles operating in the movement area must display yellow flashing lights at all times in accordance with MOS Part 139, Chapter 9.19.1. Drivers who do not obey the rules for driving airside may have their ADA cancelled at the discretion of the General Manager Operations & Assets or the Airport Safety Officer.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Airside Vehicle Control 104

(ii) the method of instructing and testing drivers in relation to the applicable traffic rules

All applicants for an ADA are given a copy of the Airside Drivers Handbook and are expected to spend a minimum of four (4) hours in the company of a current ADA holder if they are only going to operate on the aprons and taxiways, and eight (8) hours if they also going to operate on the runways. Each applicant undertakes a written test of the Airside Driving Rules and is expected to receive 95% pass rate. Each applicant must hold a current Australian Drivers Licence. Drivers who are required to enter the security areas on the movement area are also required to hold a current ASIC.

(iii) the names, telephone numbers and roles of the persons who are responsible for airside vehicle control

The General Manager Operations & Assets, the Airfield Manager and the Airport Safety Officers are responsible for airside vehicle control. Their contact telephone numbers are in the Master Contact List in the Introduction Section of this Aerodrome Manual. The General Manager Operations & Assets is responsible for:

• Developing future vehicle control procedures, as required

The Airfield Manager is responsible for:

• Ensuring the Airport Safety Officers have sufficient resources to authorise and monitor airside driving activities

• Maintain records of airside driver authorisations

The Airport Safety Officers are responsible for:

• Authorising drivers to operate on the airside

• Monitoring airside vehicle control See also Section 5 - Unauthorised Entry to Aerodrome

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Wildlife Hazard Management 105

Sunshine Coast Airport

Part 2

Section 11

Wildlife Hazard Management

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Airside Vehicle Control 106

Part 2 Section 11 Wildlife Hazard Management

The Sunshine Coast Airport Wildlife Hazard Management Plan is published and distributed under separate cover.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Obstacle Control 107

Sunshine Coast Airport

Part 2

Section 12

Obstacle Control

Initial Issue: February 2006 Obstacle Control 108

Updated: February 2019

Version: 1.4

Part 2 Section 12 Obstacle Control This section of the manual contains information on obstacles that may affect aircraft operations. The monitoring and ongoing protection of the Obstacle Limitation Surface (OLS) is fundamental to ensuring safe aircraft operations and ensuring that Sunshine Coast Airport can be developed into the future. Particulars of the following:

(i) the procedures for monitoring the obstacle limitation surfaces and the Type A chart take-off surface for obstacles

SCA Pty Ltd. monitors the potential effect of the new structures on the airport Obstacle Limitation and PANS-OPS surfaces through its planning approval process. Any tall structures proposed within the Sunshine Coast Region are referred to the General Manager Operations & Assets or his delegate to assess whether they may affect aircraft operations. If it is possible that a structure may affect the departure and approach procedures or infringe the OLS or PANS-OPS surfaces for Sunshine Coast, the details are forwarded to the CASA and Airservices Australia (ASA) Instrument Procedure Design Section for assessment. Airport Safety Officers include a visual check for new obstacles in the approach/take-off and transitional surfaces during their daily inspections. The OLS will be checked by physical survey, on an annual basis, by a suitably qualified surveyor. The parameters for the OLS surfaces to be surveyed are included in Appendix 2. The results of the survey will be provided to the General Manager Operations & Assets and if amendments to published information are required, they will be notified to CASA and AIS by NOTAM. This notification will generally be undertaken by the General Manager Operations & Assets or the Airfield Manager. A record is maintained of all surveys and NOTAM advice in the Airport Operations Office area by the Airfield Manager.

The overall OLS plans for Sunshine Coast Airport are shown in Appendix 1 and Appendix 4. For any new tall structures or additions to existing tall structures in the OLS area, full details are requested including elevation in relation to the Australian Height Datum.

Temporary Obstacle Assessment Crane operations are assessed using the crane application form shown in Appendix 3. Any proposed activity likely to infringe the OLS is referred to Airservices Australia and CASA for assessment. Once assessed and if approved, NOTAM is issued as required accordingly. An Aerodrome Obstacle Chart Type A chart has been produced for Sunshine Coast Airport and can be reviewed on request. Type A chart notifications are issued through the Type A Chart distribution list, maintained by General Manager Operations & Assets or delegate.

Initial Issue: February 2006 Obstacle Control 109

Updated: February 2019

Version: 1.4

(ii) the procedures for monitoring building developments (in relation to the height of buildings and other structures) within the horizontal limits of the obstacle limitation surfaces

SCA Pty Ltd. considers the potential effect on the obstacle limitation surfaces as part of its planning approval process. The obstacle limitation surfaces contour plan determines the height control for any development within a 15 kilometre radius of the airport. Planning applications, which are in the nominated OLS area, are referred to the General Manager Operations & Assets who determines whether the proposed structure will affect aerodrome operations. If the object is an industrial chimney, smoke stacks at power stations, smelters or combustion sources capable of generating exhaust plumes with an average vertical velocity exceeding the limiting value, (4.3 m/s at the height of the airport OLS), the proposal will be referred to CASA to assess the potential hazard to aircraft safety. Tall obstacles, which are in the Sunshine Coast but outside the OLS area, are also referred to the General Manager Operations & Assets. The Obstacle Limitation Surfaces (OLS) Plans are monitored and maintained by the General Manager Operations & Assets or his delegate. Any proposed activity (including crane operations and proposed building developments) that are likely to infringe OLS or PANS-OPS surfaces are forwarded to CASA and Airservices Australia (Instrument Procedure Assessment) for operational and aviation hazard assessment.

(iii) if the aerodrome has instrument approach procedures – the

procedures for monitoring for new objects or building developments in any other areas nominated by the instrument procedure designers

The General Manager Operations & Assets or his delegate will arrange for an annual reconnaissance of the areas covered by Airservices Australia procedure designs to ensure that no higher objects have been erected close to the critical obstacles listed in the Table associated with the plans provided by Airservices Australia. The Civil Aviation Safety Authority will also be notified of any new obstacles.

(iv) the arrangements between CASA, local planning authorities and other relevant organisations in relation to the approval of building developments that may infringe the obstacle limitation surfaces

The Sunshine Coast Regional Council is the local planning authority and through its Local Environment Plan controls all building developments. If development proposals appear to affect the OLS of the airport, CASA and Airservices Australia may be requested by the SCA Pty Ltd. General Manager Operations & Assets

Initial Issue: February 2006 Obstacle Control 110

Updated: February 2019

Version: 1.4

or delegate to undertake an assessment of the proposed development to ascertain the impact on aircraft operations at Sunshine Coast Airport.

(v) the names, telephone numbers and roles of the persons responsible

for planning and implementing obstacle control

The General Manager Operations & Assets, the Airfield Manager and the Airport Safety Officers are responsible for planning and implementing obstacle control. Their contact telephone numbers are in the Master Contact List in the Introduction Section of this Aerodrome Manual.

The General Manager Operations & Assets is responsible for:

• Arranging an annual survey of the OLS

• Ensuring that all proposed developments do not impact the airport’s OLS

• Requesting CASA for an assessment of an object that may impact on aircraft operations

The Airfield Manager is responsible for:

• Ensuring sufficient resources to enable the Airport Safety officer to effectively monitor the OLS

• Issuing appropriate NOTAM as a result of annual survey.

The Airport Safety Officer is responsible for:

• Checking the OLS as part of the Daily Serviceability Inspection

• Notifying the General Manager Operations & Assets/Airfield Manager of any temporary objects that may be infringing the OLS

• Issuing appropriate NOTAM as a result of annual survey if directed and for any other temporary obstacles that may be in the vicinity of the airport

Sunshine Coast Regional Council will alert the SCA Pty Ltd. Chief Executive Officer or the General Manager Operations & Assets of any planning proposal that may have the potential to infringe the OLS.

Initial Issue: February 2006 Obstacle Control 111

Updated: February 2019

Version: 1.4

Appendix 1 OLS 18/36 Plan No. AOM03 Sheet 1 of 2

Initial Issue: February 2006 Obstacle Control 112

Updated: February 2019

Version: 1.4

Appendix 1 OLS 18/36 Plan No. AOM03 Sheet 2 of 2

Initial Issue: February 2006 Obstacle Control 113

Updated: February 2019

Version: 1.4

Appendix 2 PARAMETERS FOR THE OLS SURVEY

RWY 18/36 Length 1797 metres Width 30 metres Instrument Non-Precision Code 3 RWY 18 TODA 1857m TODA End RL: 3.60m AHD RWY 36 TODA 1857m TODA End RL: 3.53m AHD Approach and Take-off survey specifications Approach splay: Inner edge 150 metres Divergence 15% Length 15000 metres

Survey origin from Threshold – 60m Inner Horizontal, Conical and Transitional Surfaces as per MOS Part 139 Table 7.1.1. Code 3 Instrument Non-precision

Take-off splay: Inner edge 180 metres Divergence 12.5% Length 15000 metres

Initial Issue: February 2006 Obstacle Control 114

Updated: February 2019

Version: 1.4

Appendix 3

CRANE OPERATION APPROVAL

Advice from Crane Operator Name: __________________Company: __________________Time: ____________ Contact Phone : ___________________ Contact Email : ____________________ Contact Mobile : _____________________ Crane Location : ______________________________________________________ Ground Level AHD (RL): ___________ Crane Operating Height (AGL): _________ Crane Operating Height (mAHD): _____________ Duration: from _____________________ to ________________________ Contact with driver available: Yes/No Ph: ______________________ Crane Boom Painted (Yes/No/Colour): __________ Hazard LGTS at top of boom (Yes/No): __________

OLS Check Surface: ____________________________________________________________ Infringement: Yes/No Amount (m) _________________________ Advice from CASA: _______________________ NOTAM required: Yes/No Attendant required: Yes/No Other arrangement: ___________________________________________________ Written approval required: Yes/No Approval authorised by _____________________________ Signature Request rejected by _____________________________ Signature Crane Approval No.: _________________________________ Airport Safety Officer to be advised of all known cranes Copy: Airport Safety Officer and Air Traffic Control Tower

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Disabled Aircraft Removal 115

Appendix 4 OLS HLS J Plan No. AS19AV01

Initial Issue: February 2006 Disabled Aircraft Removal 116

Updated: February 2019

Version: 1.4

Sunshine Coast Airport

Part 2

Section 13

Disabled Aircraft Removal

Initial Issue: February 2006 Disabled Aircraft Removal 117

Updated: February 2019

Version: 1.4

Part 2 Section 13 DISABLED AIRCRAFT REMOVAL

Particulars of the procedures for removing an aircraft that is disabled on or near the movement area, including details of the following:

(i) the roles of the aerodrome operator and the holder of the aircraft’s certificate of registration

SCA Pty Ltd. has prepared a Disabled Aircraft Recovery Strategy Plan which is published separately to the Aerodrome Manual and covers all aspects involved in the removal of a disabled aircraft from the movement area on the airport. The pilot is expected to have the authority of the holder of the aircraft's certificate of registration to immediately remove an aircraft that is obstructing operations on the movement area of the airport. The holder of the aircraft's certificate of registration is responsible for providing, by the fastest means possible, any special equipment that may be necessary to permit removal of a disabled aircraft. Removal of crashed aircraft is subject to the clearance of Air Traffic Safety Bureau (ATSB) and other investigating teams. The Directorate of Defence Aviation and Air Force Safety are responsible for any investigation following an accident involving an Australian Defence Force aircraft. The Aerodrome Emergency Plan, (Refer Part 2, Section 2 of this Manual), also details the responsibilities for removal of disabled aircraft.

The General Manager Operations & Assets or his delegate will ensure that a NOTAM and markings are initiated if required.

(ii) the arrangements for telling the holder of the certificate of registration

Initially the pilot of a disabled aircraft is expected to notify the holder of the aircraft's certificate of registration.

The person responsible for notification to the Certificate of Registration holder to remove the aircraft, if the pilot is not available, is the General Manager Operations & Assets. If the Certificate of Registration is not known to the General Manager Operations & Assets then details will be obtained from the pilot if possible or from the CASA web site:

http://casa.gov.au/casadata/register/index.htm

Initial Issue: February 2006 Disabled Aircraft Removal 118

Updated: February 2019

Version: 1.4

(iii) the arrangements for liaising with air traffic control and the Australian Transport Safety Bureau (ATSB)

Sunshine Coast Airport has Air Traffic Control (ATC) present during the hours of approximately 07:30hrs to 19:40hrs daily. If the ATC become aware of a disabled aircraft, they will immediately call the Airport Rescue Fire Service and the Airport Safety Officer. In consultation with the Airport Safety Officer, parts of the movement area may be closed to other aircraft traffic. Outside of the ATC operating hours the Airport Safety Officer will notify the General Manager Operations & Assets and Brisbane ATC of closure of parts of the movement area due to the disabled aircraft.

ATSB will be notified immediately of an occurrence that requires their involvement by the Chief Executive Officer or General Manager Operations & Assets.

(iv) the arrangements for obtaining equipment and persons to remove the aircraft

The holder of the aircraft's certificate of registration is expected to provide, by the fastest means possible, any specialised equipment and personnel required to remove a disabled aircraft. SCA Pty Ltd. staff may assist with plant and equipment to assist the recovery. Prior to any recovery assistance from SCA Pty Ltd. resources, the aircraft operator is required to indemnify SCA Pty Ltd. from any adverse consequence resulting from its staff’s activities during the recovery process. A copy of the Indemnity Form is included in Appendix 1 of this section. SCA staff will also advise the aircraft operator the contacts of any commercial crane operators that may assist in providing equipment for the removal of disabled aircraft.

(v) the names and roles of the persons who are responsible for arranging for the removal of an aircraft which is disabled, and the telephone numbers for contacting them during and after working hours

The Chief Executive Officer, General Manager Operations & Assets, Airfield Manager and the Airport Safety Officers are responsible for coordinating the removal of an aircraft which is disabled. The pilot can contact a Crane Hire Service or appropriate towing service or other equipment as necessary. Their contact telephone numbers are in the Master Contact List in the Introduction Section of this Aerodrome Manual

The Chief Executive Officer/General Manager Operations & Assets is responsible for:

• Coordinating the removal of disabled aircraft

• Ensuring a NOTAM and markings are initiated if required

Initial Issue: February 2006 Disabled Aircraft Removal 119

Updated: February 2019

Version: 1.4

• Ensuring notification of the Certificate of Registration holder

• Ensuring that an Indemnity and Release Form is executed prior to any airport staff involvement in the removal of disabled aircraft

The Airfield Manager /Airport Safety Officer is responsible for:

• In the absence of the General Manager Operations & Assets coordinating the removal of disabled aircraft

• Ensuring a NOTAM is issued and markings are initiated.

• Assisting with the notification of the Certificate of Registration holder

• Assisting with the removal of the aircraft if requested by the Certificate of Registration holder only after an Indemnity and Release Form has been executed

Initial Issue: February 2006 Disabled Aircraft Removal 120

Updated: February 2019

Version: 1.4

Appendix 1

INDEMNITY AND RELEASE

MOVEMENT OF STATIONARY AIRCRAFT

TO: Sunshine Coast Airport Pty Ltd. As Trustee For Sunshine Coast Airport Trust

I, the undersigned, being the owner or the duly authorised representative of the owner of the aircraft described below hereby agree to provide this indemnity and release on the conditions set out below. 1. I agree and consent to Sunshine Coast Airport Pty Ltd. As Trustee For Sunshine Coast

Airport Trust, its servants, agents, contractors and employees ("the Airport Operator") to move at any time required by the Airport Operator the aircraft at my sole cost and expense.

2. In consideration of the Airport Operator moving the aircraft I agree to indemnify and keep

indemnified the Airport Operator against all and any loss damage cost charge expense or other liability however suffered paid or incurred by or threatened against the Airport Operator in relation to or arising out of or in consequence of any action, proceeding, claim or demand which is or may be brought, made or prosecuted or threatened against the Airport Operator in respect of any loss of or damage to property, loss of life or personal injury or other loss that may arise in any way from the moving of the aircraft by the Airport Operator.

3. I further agree to release the Airport Operator from all claims actions, causes of actions,

proceedings and demands which I or the owner now has or but for this indemnity and release would or might at any time in the future have against the Airport Operator and from all present and future liability of the Airport Operator to me and or the owner however caused in relation to or arising out of or in consequence of the moving of the aircraft.

4. I confirm that it is the intention of this indemnity and release that each servant, agent,

contractor and employee of the Airport Operator obtain the benefits expressed in their favour under this indemnity and release and be entitled to enforce such benefits.

5. I confirm that I and the owner have abided by all applicable laws including without

limitation acts, regulations, by-laws, directions and determinations relating to or made by the Civil Aviation Safety Authority, the Australian Transport Safety Bureau, The Department of Infrastructure and Regional Development, the Commonwealth of Australia, and any other relevant authority or body which has authority in relation to interference with or movement of an aircraft.

Description of Aircraft: …………………………………………………………………………….…. Type of Aircraft: ……………………………………………………………….…………………….… Registration: …………………………………………………………………………………………… Signed by: ……………………………………………………………………………………………… Full Name: ……………………………………………………………………………………………… In the presence of: ……………………………………………………………………………………. Date: …………………………………………………………………………………………………….

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Handling of Hazardous Materials 121

Sunshine Coast Airport

Part 2

Section 14

Handling of Hazardous Materials

Initial Issue: February 2006 Handling of Hazardous Materials 122

Updated: February 2019

Version: 1.4

Part 2 Section 14 HANDLING OF HAZARDOUS MATERIALS

Particulars of the procedures for the safe handling of hazardous materials on the aerodrome; including details of the following:

(i) the names, telephone numbers and roles of the persons who are to receive and handle hazardous materials

SCA Pty Ltd. does not act as a handling agent for hazardous materials. The carrier or facility operator maintains exclusive responsibility for these materials. Australian Standard AS1940-2004: The Storage and Handling of Flammable and Combustible Liquids defines Minor Storage in Section 2. Some tenants store less than Minor Storage amounts of avgas on their premises. SCA Pty Ltd. conducts environmental audits of tenant premises to ensure that limits are not exceeded. Hazardous materials handled on airport and contact details are as follows:

Aviation Fuel – Jet A-1 - Viva Energy Company of Australia (Airport Refuelling Services) Ph. (07) 5448 7114

- LifeFlight Sunshine Coast Ph. (07) 5458 8700

- Less than Minor Storage

• Blue Tongue Helicopters

• Durello

• Becker Helicopters

• Flight Options

• Pacific Crown

Aviation Fuel - Avgas - Viva Energy Company of Australia (Airport Refuelling Services) Ph. (07) 5448 7114

- Less than Minor Storage

• Becker Helicopters

• Sunshine Coast Aero Club

• Blue Tongue

Aviation Oils - Viva Energy Company of Australia (Airport Refuelling Services) Ph. (07) 5448 7114

- Less than Minor Storage

• Steele hangar

• Blue Tongue Helicopters

• Durello

• Becker Helicopters

• Pacific Crown

• Sunshine Coast Helicopter Rescue Services

Initial Issue: February 2006 Handling of Hazardous Materials 123

Updated: February 2019

Version: 1.4

• Maroochy Two One

• Sunshine Coast Aero Club

• Aerodynamic Flight Academy

• Jetstar

• ARFFs

Various aviation chemicals (e.g. degreasers, cleaners, paints)

- Less than Minor Storage

• Blue Tongue Helicopters

• Viva Energy Company of Australia

• Becker Helicopters

• Pacific Crown

• Flight Options

• Life Flight

• Aerodynamic Flight Academy

• Sunshine Coast Airport

- Aviation Rescue and Fire Fighting

- AFFF bulk storage

Diesel Fuel Sunshine Coast Airport - 1000L (plus 800 litres)

Aviation Rescue and Fire Fighting - 600 litres Less than Minor Storage

• Swissport Operations

Herbicides No hazardous herbicides are stored on airport.

Pesticides No pesticides are stored on site. On occasion contractors are used.

Their contact telephone numbers are in the Master Contact List in the

Introduction Section of this Manual.

Initial Issue: February 2006 Handling of Hazardous Materials 124

Updated: February 2019

Version: 1.4

(ii) the arrangements for special areas on the aerodrome to be set up for the storage of flammable liquids (including aviation fuels) and any other hazardous materials

On Sunshine Coast Airport hazardous substances are to be:

• Stored in approved cabinets

• Stored in bunded areas where required

• Correctly labelled in appropriate containers

• Placarded appropriately

Flammable and combustible liquids are to be stored in accordance with AS1940-2004 The Storage and Handling of Flammable and Combustible Liquids. In particular, the following details of major storage are provided:

Operator Tank Capacity

Tank Contents

Location

Viva Energy - Airport Refuelling Services Pty Ltd.

55,000 ltr Partial underground

JET A1 Fuel farm adjacent to terminal

Viva Energy - Airport Refuelling Services Pty Ltd.

2 x 27,000 ltr Underground

Avgas Fuel farm adjacent to terminal

LifeFlight Sunshine Coast Base

2000 ltr Tanker

Jet A1 Friendship Avenue (Western General Aviation Area)

Sunshine Coast Airport Pty Ltd.

1000 ltr Above ground

Diesel Apron Hard Stand

Beckers Helicopters Avgas

Blue Tongue Avgas

Spotless Services 2 x 454 ltr LPG Front of terminal

• Corrosive and radioactive materials may be accepted as airline cargo and are handled in accordance with airline Dangerous Goods requirements.

• Explosives are not routinely handled on airport. If a request is made to transfer explosives, reference will be made to CASA and AC 92A-01. An assessment of the airport’s limitations will be made to ensure safety distances, safe handling, and suitable times are met. Approval will be required from the General Manager Operations & Assets or his delegate.

Initial Issue: February 2006 Handling of Hazardous Materials 125

Updated: February 2019

Version: 1.4

(iii) the methods to be followed for the delivery, storage, dispensing and handling of these materials

Hazardous materials are to be delivered in the most direct route to the dispensing point or company accepting the materials. SCA Pty Ltd. does not have specific guidelines for deliveries; however transportation will be in accordance with statutory requirements. Hazardous materials must be stored in accordance with relevant Australian Standards or industry codes of practice. Aviation Jet A-1 fuel is dispensed by:

• Mobile tanker (Viva Energy)

• Hose (LifeFlight Sunshine Coast) Aviation Avgas fuel is dispensed by:

• Bowser (Viva Energy)

Airline Dangerous Goods are stored and handled in accordance with airline Dangerous Goods plans.

Spillages: If spillage occurs of any hazardous materials the company that is responsible for the spillage must immediately notify the Airport Safety Officer who will in turn activate the Sunshine Coast Airport Emergency Management Plan, and or the Airport Emergency Plan. The Queensland Fire and Rescue Service is the lead agency for hazardous incidents. The Aviation Rescue and Fire Service will respond to aviation fuel spills in the first instance. The company which owns the spilt material is ultimately responsible for ensuring that clean up is completed. Limited clean up materials are available from:

• Sunshine Coast Airport Pty Ltd.

• Viva Energy Company of Australia

Note 1 Hazardous materials include explosives, flammable liquids and solids,

corrosive liquids, compressed gases and magnetised or radioactive materials.

Note 2 The arrangements to deal with an accidental spillage of hazardous

materials are to be set out in the Aerodrome Emergency Plan.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Protection of Radar and Navigational Aids

126

Sunshine Coast Airport

Part 2

Section 15

Protection of Radar and

Navigational Aids

Initial Issue: February 2006 Protection of Radar and Navigational Aids 127

Updated: February 2019

Version: 1.4

Part 2 Section 15 Protection of Radar and Navigational Aids

Particulars of the procedures for the protection of radar and navigational aids located on the aerodrome to ensure that their performance will not be degraded, including details of the following: (i) the arrangements for the control of activities near radar and navigational

aid installations

The following navigational aids are located within the Sunshine Coast Airport boundary area: • VHF Omni – Directional Radio Range Beacon • Distance Measuring Equipment (DME) • Non-Directional Beacon (NDB) • Automatic Weather Station

Unauthorised entry is not permitted into areas prescribed around navigation aids by MOS Part 139 Chapter 11. Restrictive signs have been placed by the ASA Airways Technical Services (Brisbane) at all navigational aid installations. To maintain obstacle clearance zones around navigational aids, positioning new buildings, masts or other structures near navigational aids is controlled by SCA Pty Ltd. management. Airservices Australia and CASA are consulted before any approvals are provided by SCA Pty Ltd to erect building, aerials, masts, etc. at or near the navigational aids.

(ii) the arrangements, made in consultation with the provider of the navigational aid installation, for the supply and installation of signs warning of hazardous microwave radiation

Appropriate signs around nav-aids on the airside have been provided by Airservices Australia.

(iii) the arrangements for ground maintenance near these installations

Ground maintenance in the vicinity of nav-aids is controlled by Airservices Australia. Airservices Australia have arranged for grass cutting to be carried out on a contractual basis. Contractor’s employees are briefed by ASA on the method of working in specified areas. ASA are notified each time grass cutting works are carried out at the VOR.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Low Visibility Operations 128

Sunshine Coast Airport

Part 2

Section 16

Low Visibility Operations

Initial Issue: February 2006 Low Visibility Operations 129

Updated: February 2019

Version: 1.4

Part 2 Section 16 Low Visibility Operations Particulars of the procedures for management of ground activities at Sunshine Coast Airport Sunshine Coast Airport facilities do not support aircraft operations (take-off and landing) in low visibility conditions. The Standard Operating Procedures referred to in in this manual are designed to enable the ASOs to secure the airfield and provide the necessary information to ATC. Refer: SCA Pty Ltd Standard Operating Procedures (SCAPL-SOP-014).

(i) During operating hours ATC determine and notify ASO if low visibility procedures (LVP) are to commence. The proceedings commence when visibility reduces to 1500 metres, runway visibility is 800 metres or less or the cloud ceiling is 200FT or less. Outside of ATC hours and if an ASO is on shift, the ASO will refer to SCAPL-SOP-014 as a guide only.

(ii) Airport tenants are to be notified at activation/termination of LVP. Any active worksites are stood down and all personnel vacated from airside. Unmanned gates remain locked and electronic gates immobilised. Essential vehicles are only be directed access under ASO escort.

(iii) A runway inspection will be undertaken, including taxiways and aprons to

ensure vehicles and work activities have been cleared. Confirmation of each cleared area confirmed via radio with ATC. The ASO will be stationed on the RPT Apron to monitor for vehicles/pedestrians. ASO will conduct full inspections of runways, taxiways and helicopter landing site once LVP terminated.

(iv) ATC will determine and activate LVP during ATC hours. ASO will notify the

General Manager Operations and Assets once notified by ATC. Contact details can be found in the Master Contact List in the Introduction Section of this manual.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Local Procedures 130

Sunshine Coast Airport

Part 2

Section 17

Local Procedures

Initial Issue: February 2006 Local Procedures 131

Updated: February 2019

Version: 1.4

Part 2 Section 17 Local Procedures 1. Pavement Concessions A pavement concession is a privilege that may be granted to an aircraft operator allowing the landing, take-off, taxiing or parking of an aircraft on a runway, taxiway or apron, which would not otherwise be available.

It is an instrument of pavement management, enabling an aircraft operator to load an aircraft pavement beyond the rated capacity under specific conditions generally related to aircraft tyre pressure, mass and frequency of operations and the condition of the pavement.

Airport management is responsible for determining in each case whether a pavement concession is to be granted and any special conditions applicable. Additional landing fees may be charged. There is no mandatory requirement for the Airport operator to grant a pavement concession.

In normal circumstances, a pavement concession allows the airport operator to gain the benefit of occasional heavier/larger aircraft operations on pavements of lesser design standard without significant cost outlay or reduction in pavement life. A pavement concession is based on economic considerations. Airport management will weigh the advantage to be derived from allowing some pavement overload , against the penalties involved (e.g. pavement repair or the need to carry out maintenance earlier than would be normal) and decide accordingly.

To identify the strength of pavements, the Aircraft Classification Number – Pavement Classification Number (ACN-PCN) method is used. The pavement strength rating (PCN) for Sunshine Coast Airport is listed in the ERSA. Operations by aircraft imposing more severe loadings on the pavement than are allowed by the pavement rating are not permitted without a pavement concession.

The handling and issue of pavement concessions is to be in accordance with the procedures set out below.

2. Concession Decision Criteria Aircraft operators apply to the airport operator for consideration of a pavement concession, providing full details of the proposed movement(s). Each application from an operator for an aircraft to operate outside the limits allowed by a pavement rating involves assessment on a case by case basis.

To ensure the safety of the operation where the proposed overloading of a pavement is so great that damage to the aircraft is likely to the extent that the safety of the occupants is in doubt, a pavement concession is not to be approved regardless of the circumstances.

Initial Issue: February 2006 Local Procedures 132

Updated: February 2019

Version: 1.4

3. Granting Pavement Concessions Approvals can be granted by the General Manager Operations & Assets, the Chief Executive Officer or their delegates. Operators are advised if a pavement concession is granted and any conditions imposed. ATC is also advised. An approval may take the form of an AD HOC or standing pavement concession:

(1) AD HOC The “ad hoc” pavement concession is to be used to cover a small number

of operations and issued on a flight by flight basis, or covering several flights on the one concession.

(2) STANDING The “standing” pavement concessions are to be used to cover a relatively

large number of operations carried out over an extended period. They allow a specified number of movements over a fixed period.

(3) SCHEDULED PERIOD The “scheduled period” pavement concession is to be issued to airlines

to provide a pavement concession for the whole of the duration of the schedule period.

(4) ADVISORY The “advisory” pavement concession is to be used, in response to

requests for pavement concessions at some future but unspecified date. The request is actioned, but issue of the pavement concession is delayed pending advice of the actual date from the operator.

Initial Issue: February 2006 Local Procedures 133

Updated: February 2019

Version: 1.4

Appendix 1 Pavement Concession Advice Form

SUNSHINE COAST AIRPORT PTY LTD. AS TRUSTEE FOR SUNSHINE COAST AIRPORT TRUST

Concession No.

PAVEMENT CONCESSION

Concession Type

Date and Time of Movements

TO

No. of Movements

Operator

Type of Operation

Reason for Operation

Aircraft Type

Max. Permitted Weight

Max. Permitted Tyre Press.

Movement areas to Which This Concession Applies

Special Conditions:

1. THIS CONCESSION IS SUBJECT TO REVIEW AND/OR WITHDRAW, AT DISCRETION OF SUNSHINE COAST AIRPORT PTY LTD, IF PAVEMENT DAMAGE IS OCCURRING DUE TO OVERLOADING BY AIRCRAFT OPERATING UNDER WEIGHT AND TYRE PRESSURE CONCESSIONS.

2. NOTAM TAKE PRECEDENCE OVER PAVEMENT CONCESSIONS.

3. SUNSHINE COAST AIRPORT PTY LTD TAKES NO RESPONSIBILITY FOR ANY DAMAGE THAT MAY OCCUR TO AIRCRAFT OPERATIONS UNDER PAVEMENT CONCESSIONS – REFER AIRPORT CONDITIONS OF USE.

Approved ……………………………………. …………………………. SCA Pty Ltd General Manager-Operations & Assets Date

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Notification in AIP ERSA 134

PART 3

NOTIFICATION IN AIP-ERSA

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

General Information 135

Sunshine Coast Airport

Part 3

Section 1

General Information

Initial Issue: February 2006 General Information 136

Updated: February 2019

Version: 1.4

Part 3 Section 1 General Information

The following general information about the aerodrome: (i) the name of the aerodrome:

Sunshine Coast Airport

(ii) the State or Territory where the aerodrome is located:

Queensland (iii) the geographic coordinates of the aerodrome reference point:

S 26 36.2 and E 153 05.5 (iv) the elevation of the aerodrome, based on the

Australian Height Datum:

15 ft AHD

(v) details of the aerodrome beacon:

On Control Tower flashes 10 White/Green per minute (vi) the name of the aerodrome operator and the address and telephone

numbers at which the aerodrome operator may be contacted at all times:

Sunshine Coast Airport Pty Ltd. As Trustee For Sunshine Coast Airport Trust PO Box 9535 Pacific Paradise QLD 4564

Airport Operations BH: 1300 993 543

After hours On Call Pager: 3830 5251

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Information for Runways 137

Sunshine Coast Airport

Part 3

Section 2

Information for Runways

Initial Issue: February 2006 Information for Runways 138

Updated: February 2019

Version: 1.4

Part 3 Section 2 Information for Runways

The following information for each runway at the aerodrome: (i) the magnetic bearing of the runway and the runway number

RWY DESIGNATION RWY BEARING

18/36 183°/003°

(ii) the runway reference code number for the approach and take-off areas

that have been surveyed

RWY DESIGNATION RWY REFERENCE CODE

18/36 3 (iii) the length, width and slopes of the runway

RWY RWY LEN RWY WID RWY SLOPE RWY SHOULDERS

18/36 1797m 30m Level 3m

(iv) the length and width of the graded and overall runway strip

RWY RWY STRIP LENGTH OVERALL RWY STRIP WIDTH

18/36 1917m 150 (graded 150)

(v) the pavement surface type and its strength rating

RWY PAVEMENT SURFACE

PAVEMENT STRENGTH SHOULDER PAVEMENT SURFACE

18/36 Asphalt PCN 46/F/B/1500 (218PSI)/T Grooved asphalt

(vi) the runway declared distances and take-off gradient

RWY

(CN) TORA TODA ASDA LDA

18 (3) 1797 (5896) 1857 (6092) (2.92%) 1797 (5896) 1797 (5896)

36 (3) 1797 (5896) 1857 (6092) (2.47%) 1797 (5896) 1797 (5896)

RWY reference code based on 180M TKOF inner edge WID.

(vii) the supplementary take-off distances

RWY 18 - 919 (3015) (1.9) 1653 (5423) (2.2) 1751 (5745) (2.5)

RWY 36 - 1451 (4760) (1.6) 1650 (5413) (1.9) 1800 (5905) (2.2)

(viii) charts related to the aerodrome

1. WAC 3340. 2. Also refer to AIP Departure & Approach Procedures. 3. Type A Chart.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Information about Visual Aid Systems

139

Sunshine Coast Airport

Part 3

Section 3

Information about Visual Aid Systems

Initial Issue: February 2006 Information about Visual Aid Systems 140

Updated: February 2019

Version: 1.4

Part 3 Section 3 Information About Visual Aid Systems

The following information about visual aid systems at the aerodrome: (i) the type of runway lighting and the stand-by power, if any, for that

lighting

RWY 18/36 MIRL PALC + AFRU 124.4

SDBY PWR AVBL

Other lighting

ABN 10 WG

(ii) the type of approach lighting RWY 18/36 Runway Threshold Indicator Lights

(iii) the visual approach slope indicator system, if any

RWY 18 PAPI 3.0 DEG45FT RWY 36 PAPI 3.0 DEG50FT

(iv) a description of the visual docking guidance systems at any aprons used by aircraft conducting international operations, and the aircraft parking positions where the systems are installed

Not applicable at Sunshine Coast Airport.

Initial Issue: February 2006

Updated: February 2019

Version: 1.4

Local Information 141

Sunshine Coast Airport

Part 3

Section 4

Local Information

Initial Issue: February 2006 Local Information 142

Updated: February 2019

Version: 1.4

Part 3 Section 4 Local Information

The following local information about the aerodrome: (i) The hours of operation, if applicable

24 hrs, 7 days a week

(ii) The available ground services

Viva Energy Australia Pty Ltd D 2200-0700. Phone 07 5448 7114, AH 0408 711 968. AVGAS, JET A1. MACHJET – FB0 H24 D. PH 1300 PLANES (752365 or 07 5457 0778). EMAIL: [email protected]. Full FBO services. Aerocare – FBO email: [email protected], PH 0403 455 443.

(iii) Local Traffic Regulations

1. Pilots to exercise caution on TWY D, BTN G & B2 and on TWY E, BTN M & J, due to lack of visibility FM the Control TWR.

2. RWY 18/36 – ACFT ABV 23,000KG MTOW to make 180 DEG MAX RAD turns following yellow line at RWY end turning nodes.

3. TRAINING FLIGHTS

a. Other than ARR ACFT, instrument APCH and LGD (IAL) training approval shall be obtained from Network Coordination Centre (NCC) on 1800 020 626.

b. All ACFT planning practice instrument APCH and NAVAID training require ATC approval, pilots must book a slot online at www.bookawk.com.

c. Circuit training requires prior approval from ATC and circuit training permitted only BTN HR of 2100 and 1200 UTC.

d. Pad Delta refer to Helicopter markings on TWY D.

4. PARKING

a. Due to security requirements & shortage of apron space, all ACFT ABV 5700KG and light jet and turbine ACFT which are not RPT, must obtain prior approval of AD OPR if they are programmed to stage through or remain at Sunshine Coast Airport. To obtain such approval 48 HR notice is required; Phone 0419 658 272, AH 07 3830 5251. PN for HEL PRKG

b. GA ACFT BLW 5700KG not permitted on main apron. Access to the Southern GA apron is via TWY D & access to the Western GA apron is via TWY E.

c. ACFT accessing RPT apron FM RWY 18/36 for:

(i) Bay 1 & 2 use TWY BRAVO-2;

(ii) Bay 3 & 4 use TWY BRAVO-1.

d. ACFT ABV 5700KG RQ prior approval of AD OPR (Sunshine Coast Airport Pty Ltd.) OPR BTN HR of 2200 and 0700 LMT. PN for HEL OPS (Non EMERG).

Initial Issue: February 2006 Local Information 143

Updated: February 2019

Version: 1.4

5. Ground running of engines for maintenance purposes RQ prior approval FM AD OPR CTC +61 419 658 272.

NOICES ABATEMENT PROCEDURES

Noise Abatement Procedures (NAP) apply. AIP DAP.

ADDITIONAL INFORMATION 1. Class D airspace is in close proximity to aerodromes in Class G airspace.

(See Airspace Profile diagram). 2. Intermittent blasting HJ at Yandina quarry PSN S26 30.5 E 153 00.9 BRG

315MAG 7NM FM ARP. 3. HEL OPS FM HLS J exercise caution due to fence 8FT AGL LOC APRX

40M N of HLS J, aligned SE to NW, running parallel to TWY E, 50M offset FM TWY E CL. CTC AD OPR for additional information.

CHARTS RELATED TO THE AERODROME WAC 3340 Also refer to AIP Departure & Approach Procedures Type A Chart prepared August 2018. (iv) Local Precautions

1. OBST (APRON LGTS) LIT 83GT AMSL PSN 1270M FM START OF TORA RWY18 AND 215.1M WEST OF RWY CL INFRINGES TRANSITIONAL SFC BY 5.3FT 2. SOUTHERN APRON BAYS 11, 12 AND 13 HJ OPS ONLY NOTE: Please refer to AIP-DAP/ERSA and current NOTAMS for latest Local Information and Procedures.

Initial Issue: February 2006 Aerodrome Radio Communication Services 144

Updated: February 2019 Version: 1.4

Sunshine Coast Airport

Part 3

Section 5

Aerodrome Radio

Communication Services

Initial Issue: February 2006 Aerodrome Radio Communication Services 145

Updated: February 2019 Version: 1.4

Part 3 Section 5 Aerodrome Radio Communication Services

1. The operator of a non-controlled aerodrome must ensure that there is

a Frequency Confirmation System (AFRU) for the aerodrome if:

(a) The aerodrome is located in an CTAF-R; or (b) The aerodrome is used at least five times a week by aircraft that:

(i) are engaged in RPT or charter operations; and (ii) have a maximum passenger seating capacity of more than nine

seats

Sunshine Coast Airport has Air Traffic Control for approximately 10 hours per day. Outside of Control Tower hours the airport has a PAALC/ AFRU. PAALC/AFRU frequency 124.4.

2. The frequency Confirmation System must comply with the standards

for Frequency Confirmation Systems set out in MOS.

(a) The AFRU and the PAALC are combined at Sunshine Coast Airport. (b) The AFRU is located in the Airport Lighting Control Room.

(c) The AFRU frequency is the same as the CTAF frequency 124.4.

(d) During the morning serviceability inspection the microphone on the

radio is activated to get a response from the AFRU.

(e) If the AFRU becomes unserviceable then a NOTAM is issued and repair action is organised immediately.

(f) SCA Pty Ltd. maintains the AFRU.