1991OA215 - Base de connaissances géoscientifiques

478
1991OA215 CORE ANALYSIS REPORT AND WELL LOG FOR THE SOQUIP-ST.FLAVIEN NO 8

Transcript of 1991OA215 - Base de connaissances géoscientifiques

DESCRIPTIVE

iu = u ~

;.c X X

F m

Exploration

1-

.- N f+1

'â y

O L .~

7 W

â

L 7 Gl Y U 0 (A

m M

en GI C

E

7 a

~

Rapport de fin forage

Basses-Terres, sédiments consolidés

0 0 0

L

GI • L co G1 m O .+ G7 L

O V- F- GO

fV

5

1 Z

ti) E L G! d

O.

.Z 3

8" ne 0. en

Ô (A

.y > L 6) W U .+ .+ L W m 4 o a

✓ â

O

No pré-archivage

Intervenant

Grande-catégorie

Sous-catégorie

d L O ~ m U

RtoAais4

SOQUIP ST-FLAVIEN # 8

ANALYSE DE CAROTTES

COR

E AN

AL

YSI S

RE

POR

T

N ++ L •

s^ 7 a C a n o +, o 0-

n - Q

a -- 77 .~

+N T •~ Qy r

a a•^

+ + X •^ C W v W U i 10 7 O ^ N � c C 0 L 10 O -^ CL a U N N

N 7

EE

C a L+ N q r

17 O a C +, +, > q 5-

0 N N Q

N q a �

S-

(.3 O X L - W 'I- • C L

IV O N •^ 7 O .•- ++ N

â ~a +•

v C L a L O N U 4 N a •^

a L ~ -10•^ o- c L a aoc- ~ •• q L E

~ 0 x q J T

O 1+ ++ C C

W q O i. L L •^ C O L ++ 01 C~ q U

x a C

U - 4- C O O O

a C V -C i+ +,

C T Y G ▪ 2 .^ -0 -0 a

•1, 13 O_

Q C • • q

7++ gN

V1 d T O i+

Ÿ6 a r L L •~ 47 +» L ++ •r O

~

N C

"c' a O-~ C N 41 • RI CD

i L L. tl! 0- C a O L O

c I.- 4, fa q ~ L > L N C

vai â N E .0 F. N O O_ q

X C Ol L O - O

~ ~ N a ▪ C Oi N O T N q ^ O q .0 C 01 ^ O.

I- O ▪ O. ~

- q

al • 0 C O C O

q a.+ N C q C N q a+ O L-W •— a L u V W a

++ ~F q •^ O

L a ♦+ L

m 4-0 N

^ L a II) N C

L w+ ., a O C -

çVI ^ q

C ►- O L

$ , C

.18 ML

v ~ O O

01 a

T L - N O M

C4" •- L

OC

C A N —1 •~ ++ ++

QI L la ~

ID"~ L L ~

~ ~°

VA Western Atlas International

A Lrtmnioresserf xnoany

CORE LABORATORIES

1992 05 11

Soquip (Intragaz) 3550 Charbourg, Suite 205 Trois-Rivieres Ouest, Quebec G8Y 6S6

Attention: Mr. Yves Duchaine

Subject:

Soquip St. Flavien No. 8 Our File Number: 52131-92-0146

Gentlemen:

Diamond coring equipment and water base mud were used to core the subject well. The core was boxed at the wellsite and transported to our Calgary laboratory for analysis.

Representative samples were selected on a lithological basis and analyzed as follows:

1. Full Diameter Analysis

The samples were dried in a gravity oven. Porosity was determined by the Boyle's Law technique using helium as the gaseous medium. Permeability to air was measured in both horizontal (Kmax, K90) and vertical (Kv) directions.

2. Spectral Gamma Ray Correlation Curve.

The results of these analyses are reported in tabular and graphical form.

Samples outside the 95% confidence interval (3 standard deviations) on the Permeability X Porosity crossplots are identified by samples number(s). These samples were checked and re-analyzed to ensure data integrity. Specific comments regarding this Quality Assurance procedure are made in the Analytical Procedures and Quality Assurance section of this report.

As a guide to evaluation and correlation with other data, statistics and plots are also presented herein.

Western Atlas Canada Ltd. 4540 2011 Aver,oe N E C~ikgary Alberta Cun,ufa 12E 7H2 14031 250-4000 Faz (403) 250 5120

Soquip (Intragaz) Mr. Yves Duchaine 1992 05 11

The core material was slabbed in accordance with government regulations and two sets of white light, 216 mm x 280 mm photographs were forwarded to your office under separate cover.

Thank you for the opportunity to be of service.

Yours truly,

CORE LABORATORIES

/= „.1

i Louis G. Monahan Assistant Supervisor Routine Rock Properties

LGM/smh enclosures

CORE LABORATORIES Weetarn Atlas International

0 ~ N

N N W W ô ô m CO

.~► eol..

E E

100 N tV h!

N •f O1 01 N ~ ~ w I 1 O 1A O N 01 CO O1 ti -1

E E

i.!

1.1

PERM

EAB I

LIT

Y

J

i K 40 40

• 1 o

1189

.00-

91.6

0 11

91.6

0- 9

2.2

5

145 7

. 50

m

(COR

E RE

CEI

VED

3.0

0 m) ( 4

BOXE

S)

O

O O

1J., IA 0.1

C41

VI .r

ô

.+ 01 O-• 10 1.11 lA O IA .-1 A b N 01 IA O

.r .-1 1V -, -1 -1 O N 4.1 N..4 .r -• b 1+1 1f1

000000 ..: oOi • • • • • • • IA lV

ID b

CO 0 01 Ô CV

Irs ~ M 40 O 1V 1+1 IA AO b 0 411

N N N Wf /•I 1•1 f 10 •0. b O/ 01 01 01 01 O1 01 IA

t .41P ..41. IA IA If1

•P 10

01 IA

0. 10

1, 1.11

111 40 01 ID 01 IA O an IA p w 40 10 1.11 O N O N f 10

N N N !V 1•1 1•1 e+1 t f

OS N/R

t .1 .9. IA b 10

IA O

01 01 01 01 01 01 b 01 01 IA 0 b IA IA LA IA

CO

•• •• •• ••

BO

RA

TO

RI

ES

: ST

. E L

AYIE

N

1-a

~

DESC

RI P

TID

N

w >

~LI a+ C

W u .1.-

1- .-1 N 01 L.

û t t t û o

•+ ! ! i ♦+ ,.

II M .1.-

.4 O .0 .0 L .0 .0 .0 ..0 O I.. •f J J co

LI J

LA

bJ

RA

TO

RI

ES

: ST. FLAV

IEN

N

d Co O O O O O O ▪ O r1 O O N N 40 N ID 10 CO A A CO b A CO A A N N N N N N N N

O O O O O O O O O 40 10 Ld N LT N 40 N LO A A A A 40 A 40 A LV N LV N N N N N N

PERM

E ABIL

ITY

â Y(X

01 L0 A 40 01 O.. N M r1 N04 M 40 401.0 •0 .r

4,4 Ge0 M F-- F. F- LM

a~~- F• K ! t 4 < t

V1 - O O O O O O O O N W O 0 O 0 0 O O O O 1t . . . . . . . . O O O O O O O O O O 0 10

E Ln 00 m in 111 ... tr ..4 ..4

Ô ÔÔ4 Ô ô CO Ô Ô Ô

1ff 0 0 0 O O 0 0 0 • 0

0 11.1 _

W 4.3 0 0 0 M to O 10 O O W 101 O d N41. 0 Ll1 0 0 OC .. 0 0 4 ... 0 0 0 0

W o 0 o Ô o 0 0 O OC a u

E

u w L V

11- 4.10 LID L 10010001 4-

u I-. L L I. ▪ ▪ U Ci ■ ~ iF IF A. N A E 01 L L A L IF U U 1.1 u L1 11. r-

4.1 u u u u L1 4.6 +a 0 - u N N N L r

11 00000 N~NL: •- ~ ✓ B 1S r N

M...1 400 N M N O 0 N I.. N ... N CO N O !V O O O O O O Co O O O • O O O O O O 0 O

A LO 40 A In b Lfl 40 10 O .-t ..I .y N M O N .... 0 0 0 0 0 0 0 0 0 O O O O O O O O O

M .-1 A O N 4,0 .r O1 LO ... LA d 0 1V ... N .. O o ao 0 0 0 0 0 0 0 0.40000000

DESCR

IPTI

ON

~ O M 0 0 0 0 0 0 0 O CO ~t O V V V V V V V V .q

O

A ~

O O O O O .i

O V V O O V 0 V V

f

.. ... N O O.-I .. O rl 0 0 O V V 0 O V O V V

40 K A LA 111 10 40 40 A AA .A M N ..y CV N rl N N N N r. CV N 1 1 1 1 I I 0 0 - ôô0oa00 0 0

H- W E at OC 1..

COO .W

.1 ACV 110).••1 1.41 M.. C0 10 L71

0 0 0 0.r Q O O Q O O LV N

....... M A CO 1R 4 N O A O .-I Ln 0 01 10 A0- 10

...... N 0 0 0 O A .-.

4

1.14 OD OJ .•/ ... LV .-I p O 10 Li1 ... .. A A... 01 N 01 10 O O

r1 N 01 .-1 10 40 .•. 111 1A 10 0 CO CV N CO O r1 A A A N O In O O w 00 O O O... .q .•. N M 10 A q

~ CO rl r♦ • M f u1 10 t0 ♦

1ff 1Y1 ul of 10 SO LO LO b ... ...

0 0 401 40 01 rl w N ... O O 441 10 .•+ N 01 .M 10 40 .. 40 10 10 O r. .4 .. N M 10 u1 10 111 10 tP ui 10 10 10 L0 to

40 .. 00 MA A... OI N Of u1 0

40 A CO 0 O.. .•. M rF lA 1.11 10 00 40 00 40 ..... OI 01 01

E

Lost

co

re

0 ✓

•L O Lo

st c

ore

Dril l

ed

in

ter v

al

O

Ca d O O O ▪ O O • O O O ▪ O • O O O O O O 0 N N N M CO u1 M 111 LA O .ti O CO 0/ 01 4.1 M/0 CO A A CO O CO CO CO CO A O O N N LV N N LV CV CV CV CV CV 14 N N N N N N

0 O O O O O O 4 4 V O V V V O V O V

..... N ...1 N ... O 01 O CO O O d O O O O O V O O V O 0

r1 e41 rl rl N 01 0 A O O O CO O O o O .. O V O O O O O

U N L U U U

1F L L L T IF IF 41-

1.) u ++ U u u U N N N 411...1N N N T N L L U U L Y++ L L.+ L U

11. U

0» L L.

L~ N N

w U r- IF N s- r-

>4.15 1.- nee-. T L L > N T u u T e•- •• L~ U i+ T T L L..+ r Ll L) O.I.F. T N r 1/0000 H NO N N 2,0

F. L O a+ •+ U U 14 L ^ U U N4- 0 N U U U C U U ' } U N w

r

N N Oi T > N N N ~ N N n d N rr U U U U 00

N ro ro n ro U U U Ô

U U G 0. U MM

.r ... ~ .r r .4.••r r

O O 0 N N N O O O /- M ro ro N M1 M11 ro A

0 0 0 0 0 0 0 0 0 0 0 p 0 0 ô 0 ô ô 0 0 c N f N .. IO M w 1O O.r M Cl N N 0.1 .. CO N N .-1 N CO a CO 1•••• F. 1•••• CO F. CO 0 CO 0 0 .. a N. a 40 CO CO N N N N N N N N N N N N N N N N N N N N N

O O d O O O•

O 00400 ...... Odd O OD U1 N1 .. .111{n M1 CO M ♦ O/ 0• O f a lO 1O • M1 M1 M1 M1 M1 M1 M1 M1 N. t` M1 14.• 1\ 0 10 14. b 1.0 F. F. M1

N N N N N N N N N N N N N N N N NN N N N N

000rirrir

O 0110 0 0 00 ro ro ro v ro r r 0 O 0 0

i ta

lc fr

ac

i ta

lc fr

ac

N b 1+1 .-1 4 0I .. 471 .••I Ln V. w IN O..0 N O O.K .w .w .w O N ô

0 0 0 O O 0 d 0 0 0 0 CO o O • O d O © O d O O O IV

111 ..1 10 u1 CO oi Lf/ 0 a N 0. U1 .. 01 N Cl. O O 01 Cl. w... N N CO O O O O O O O O CO O O 0 0 0 00000000

..

0 /+l 3

W 471 tO M1 O CO O Ml N b C.) O CO 111 O ..4 O CO N40 N 10 W LO 0 0 C1.0.100.1001001) at

N O O O O O O CO O O O

4.4 ade u

E M N ... .. M ...... 0.14t

000 00.00442d4204 f N V V O V V V O V O O O

• ..

a o ♦ w 1.1 .-/ w ... ... LC) --1 b N• w w 01 O O 0 0 0 N• 0 0 0 ta 141 .. 0 0 0 V O V O O O O O

b

~ = CO b 0 .. N w O/ N b U1 N'

41 O O. CO O O b O O O

G N• 0 0 V CO V 0 0 0 0 .•I

C.1

b f w .01 N IV N N N .-1 .•. N N

Q 0 0 â ô ô â ea CI é

N O M1 10 .•. Ot 41. Pf CO 41. 01 CV CO 111• 141 01 01 FI 00d00.0000 d

•000000000

0 M1 U1 ..... M 40

Ô Ô Ô Ô Ô Ô Ô .. ô 000000000 O

N O ♦0 0.. 0 •f a 1l1 •f 01 N• 01 CA w O 10 0 0 01 01 en 10 a O •lr

M1

N M .-. 01 1/1 10 O M f 1l1 0 O O 0

O O N O O O 0V O P1 11

4040 ...... 10 O O N. 10 U1 b O41 O U1

O O Rl O 0 0 .-I .-a O O N

U1 10 CO IV ... 10 w 40 O O N• O a N 111 O 01

0 0 1.11 .-1 O ... U1 O 0 W 4

N N N N N/M .. w N

0000 .....

PERM

E AB

ILIT

Y

CO

RE

NO

. 7

152 4

,50

- 1

533. 8

5 m

(C

OR

E R

ECEI

VED

9,00

m) (

10 B

OXE

S)

J F}DO. -W ~

roc rr

400y.-.04.4F.02000.1.00 111 ♦ M1 1\ P1 01 .-1 +f O M1 N• M1 N

O .•. O Oi ... O ... O ... 0 0 0 0

M N n M1 0 M1

N. 01 b 0 00 + Ifi lP b M1 IO

• . .

Ip 01 O ... 01 .. N O a M L!1 U1 O 411 N IO en 41 /Y ..r 40 If N

b 01 ...... M w 111 lV I41 b lY 01 00 IO 1V 01 N M O . . . . . . . . . . . . . . . • . . . . . . .

40 U1 10 M1 0 01 O... 1V 1+1 P1 •f ! 1.0d ...... N M ... .. .. w.•.

.. 0/01040.104W N1VNI.IN P1 M 1•1 M M

1 1 1 1 1

.. 1 1 1

O 10 01 O w 01 .-1 N O a M In Ir ..... In N.-1 10 4f

O b:A ..... M 19 .-1 1.11 N b U1 ...... U1 M

40 40 U1 U1 M1 0 07 O ... N M M f +M b b 14. 10 01 O O... N w... .. w

.. N N N N N IV N N N 011 01 N 01 01 M M

Ill U1 Ilt U1 U1 U1 U1 141 0 6/1 LI1 111 U1 U1 U1 iA 10 b U1 0 UI 0 0 533.

02

- 33. 5

0

7C

n i

M1 a/M O a .. N 01 •f U1 ...... N M .. .r -. 1V .. N N N N N N N N N 01 P1 M M

N• IA b .1 .. ..

DESC

RIP

TIO

N

...

E

z L l-. N~ i 11

bO

RA

TO

RIE

S

Field

: ST. FLA

VIE N

Format

ion

:

V u

Âmi /11 t- L II- II-

~ E I. u~ â e lU

~ Ô 01 10 4- 11.. u u T. u u

r r U -0 ~ u UIS

Uw V •1 In

111 ~ ~ •i 1e U U U 0 VI U U

•I el M L 19 0 O 0 O O -C1 -0 '0 -0 Lo

st c

ore

talc

shy

fr

ac

•-+

: ST

. EL

AYIE

N

LAb

..R

ATO

RI

ES

1672

.00 -

1

P1

_

I.

a u u u

> e w A IUe W I- w I. a+ F rC U U .U- r r

•1 10 Y

I.1 â U v u U U r 'a r V a w r ..- ~ ~ u r u r

.L I/ L L O O O

M•"' N O 9 -12 V

ô ô ô ô ô ô p O 0 0

• C 0 R O 1V 1f1 A 10 PO ... CD N I.1 I.1 n ea O CO IO CO 10 4:11 1. C0 00 e0 N cV N N N N N N N N N N

D ESCR

I PT

ION

P ERME

ABILI T

Y

O O O O

1. A ep O N eu N N

1D O O 10 N O N 0 0 Co W O W O O O

Ô O Q O O Q O

117

10 LA M N O o Q O .+ O 10 O O 0 O N O 0 O

O OC IOA CO 0 O W uA O O

.. .r ..r O O O

V V V

..I ..1 ., 0 O 0 V V V

w W IA O O ~ N7 V V v

PO O .y N

O O O O

O O O O O O Co O 1. 1A P. 01 •iir O O1 e0 ►D 10 10 n P. CO 1. las N N N N N N N

O O O 10 M 1. .-1 01 O O O O O O O O O O O O O O O O

IA 01 IA ID 10 1O N u0 CI Ô Ô Ô Ô Q Ô C O O O O O O O O O

..I O O O M Of W •f O O O O .y N 01 O O O 0 O O Pl O O 0 0 0 0 0 10 0 0

Q CO Q Q Q Q Q Q V V V V V O V V

Q Q C• 110 O V V V V N 0 0

.1 N .d 1r 1•1 .-1 O O Q O O A 0 0 O V V V O I.1 0 0

O 01 e. 10 I.1 1•1 10 f0 ..I .M N N N N N N O O O O O O O O

Q O

..1 Q O

N O

J

MC K E

to o Ln o •f /O O1 O

I+1 O O N ►•1 .•

O 01 10 .Q-1 .• O O O

MI

...1 10 O 10 10 e►1 LO wan

i •or p O 0.y O N.•1 ..i .i o

O .10 -1

Ô LO PP 0 A 01 10 101 ♦ /O 10 LA ..... 1•1 •or ~

_ d E

153 5

.00-

38.

45

1538

.45-

39

.05

1539

.05-

40

.00

1540

.00-

72

.00

1672

.00-

73. 0

1 1 6

73.0

1- 7

4.00

16

7 4.0

0- 7

4.60

16

74. 6

0- 1

4.7

0

IA 10 IS. in 1•1 I.1

1 1 1 1 1 1 1 1 1

...... 1.1 IO I.1 f u/1 IA ..... 1.1 ♦

Ip+f M ......

Lost

co

re

1533

.50- 33. 8

5 D

ril l

ed

inte

rval

15

33.8

5- 3

5. 0

0

1 ~

~

0

V

LA. I.

JR

AT

ORI

ES

ST. FLAV

IEN

•• ..

DESC

RIPTIO

N

sh calc sdy

PERMEABILIT

Y

J

~ W i

1684.88- 87.00

' .

~A

§çit

C 11 II II II Il 11 tl 11 II Il II II

tip 2 ~ C m

m ~ g II

~ V Q . ~p ..~i~ E C

~ ~ 21 ô' w ~ .~~ t

"VD .5 ~ EE ~ ~~ ô ~ M

VH =c e~°'É.-.~~ ~

~~~ f m ~ or E ~ ~~E ~.~ m

E ~ .~.. t `~ 3 d ~

i~g 3—~ €~ `~ t m

~ ~~ ~- m $ m ~û, n Nôcl ~i~ ~' 8..... " m ~ m ~ E o

m2v ` w ~ Q m ~~ $ c ô2 T g E ~.? ~~ c

~ ?5 É~~~~~~ ~ F E~~ ~~ ~ cô~ 5~ É ~isl't~

~.2 ~~

~i i OH ~ â~i ~ c mE ~S .4i ~ m ~ _IC ~ â r~ ~

a~ ~- eo>xo. y in y~~~ GIC~ cn N F- ~ h- » >> > > >

HHU RHN HUMPH N

§ o

ûi i~H âiH H > > ~~S yO›.

11 II li I1

m ~ m m N

~ ~ ~,

E ~P

~ ~ , ~

V) 2 .:g.

l Nl

~ ~

â _ g â C

-~ m `. e m Co

a

î

1112.211 ~

E m

~

~

-8."8

E

g N

g g

>,,1..... s~ 1 2 1 g

$ H g 1~1~ 4

s=

E ~ ~

y

~_~ ~~

1~ ~1,10~~ ~~ °~ 1~

~ ~~

~mi i 4E

~5-1 ~1 0Zv2aa8n ~ E cmaaa l v ~n

ONUMUHRHUURHUOU ii ll 11 HHOUNHUP II 11 i1 11

V > ~ a a aG m vai 4`lf12_ maim2 E€~~gzZ z~0 aRa ~a a~y

M 3Igtt.iis§lsotlke DAIn

: GRAVITY OVEN

Core Transportation

Law in

a mod

ified U.S.B.M. porosimeter using

Core Gamma Spectral

LA

BO

RA

TO

RI

ES

•• ••

LA

SO

RA

TO

RI E

S

E 0 o c o 0 o c o REEENESIE

RE

MA

ININ

G C

HA

RA

CT

ER

IST

ICS

At Y

LL :4. 0 r

E O O

4 m ~ .•1

E O O

n b /p .•1

N ~

C.)

0 z w NC •

L~J z t }4

~ • N

0 O. t • 4.1 O O W G L. • E I- 01 O • F-

V W d V E ! Z C O 7 I- O 1- b Z i ►J D

NOT SPECIFIED

Identification

N O 0 ♦ O O 4...4 ID

M O O O.4. ON •f • • O N O 0 0 LW O.•1

44 O •••1

E 0 • I9

Coefficient

Standard Dev.

PERMEABILITY:

AVERAGE SATURATIONS (Pore Volume):

HETEROGENEITY (Permeability):

U U U U U

E ao ~ ~

At At At X x .+1 n In •1► In i

•r w Of o O o Of /10 40 tA •r 44414 !. CO 10 10 +I N N N N

lV 111

0 o a O O O 44

É w~ c

r É É c ls

T Standard Deviation --

L V r r r C Z M- •~ •~• O C K ~ ++ L w • V i ~ w • N!= Z' Z N OC t Z Z Z

P G

PI P! u U E A A \ \

~ ` 4. 01

~ E -IL Y F w L O p 0 • i I • W

O D O O O.. O i w O O O d D O D i[ 0 0 4 0 Z

O .••I • O N 1+1 O O

..-4

I I I I 1 I I E I I I I

Permeability

1?

~lx ~ ~~~ ~ Z C `•~+ c K "co ~ E C K Z- A •

~ ~ Z 3: Ô ... .Z ,. Z Z! ... c

C K ~. .r c ~ o >, a, V

A di >. A M Y X Z Z Y •+ L ~.1 r.r W v 9 A M w

1. V L r•. C >1 A >, •r +^ A 3 • • 10 O

N - A A A

~ Ô Ô ~ = L M t~ O

• t p L L L L V 0.- w A V I- O O. • • IS r 1- L r

L. L. = O LO In J IJ

r I

r I

SOGUIP (INTRAGAZ) SOGUIP ST. FLAVIEN N0.8

ST. FLAVIEN

Not Specified (1189.00-1687.00 m)

Cors Laboratories

- LEGEND - Not Specified

*Deleted

100.0 Permeability vs. Porosity i- --I- I- I I

I 1

10.0 a e 35

• 43 + f

~ /

I /

1

1 r 1+ 1

t

/

Lop tY) - 77.6774 * X -- 2.6064 Correlation Coef.- 0.614

—*

I .1

Horizontal Permeability

1 0

0.1

0.200

/

0.01 1 0 0 0.040

i 1 0.160 0.080 0.120

Helium Porosity: fraction

1.0 Frac t_m 1.0„ 0.76

Porosity Histogram

0.70 0.9

0.8 0.80

0.7 0.50

0.6

0.40 0.5

0.4 0.30

0.3 0.20

0.2

0.10 0.1

0.0

, 0.9'

0.6 -

0.7-

0.57

,0.4_

_0.3

0.2

0.0_0.00 I I u t t t i I .0 .060 .120 .180 .240 .300 .360 .420 .480

Helium Porosity: fraction

Ca

oecity L

ost

Not Specified (1189.00-1687.00 e)

SOBUIP (INTRAGAZ) SOflUIP ST. FLAVIEN N0.8

ST. FLAVIEN

- LE®END -

- Median Valus (0.015) Arith. Average (0.017) - culativs Frequency - - - Cumulative Capacity Lost

52 Samples Core Laboratories

SO®UIP (INTRABAZ) SOGtUIP ST. FLAVIEN N0.8

ST. FLAVIEN

-- LE6ElOa ^

-- Median Value (0.020) seos. Average (0.039)

Cumulative Frequency - - - Cumulative Capacity Lost

Not Specified (1189.00-1687.00 m) Si Samples

Core Laboratories

1.0 Permeability Histogram Frac mD-m

i.0_ *04.02 : : 100.00

0.9 ; : 90.00

0.6 60.00

0.7 ,:0.7 ~ 70.00

! 0.6 f .

: 4 60.00

0.5:- = °'3_ 30.00

0.4: :0.4_ 40.00

0.3

r - J

0.8 30.00

0.21 r :0-2: 20.00

0.1r ;0.1: 10.00

0.0 r~ 2111,

~ ~a ' 0.0; 0.00 r r

r r ri .010 .16 2.60 40. 640. 10240.

Horizontal Permeability (Max): mD

ga

oa

city L

ost

1.00

0.90 '

0.70

0.60 `

0.50_

0.40-

0.80

0.20

0.10

0.00 2600.

i 0

.0.9

.0.8

.,▪ 0.7

.0.6

.▪ 0.5

.0.4

.0.8

_0.2

.0.i

t r i ~0.0

2900.

Grain Density Histogram

2650. 2700. 2750. 2800. 2850. Grain Density: kg/m3

SOGUIP (INTRA6AZ) SOQUIP ST. FLAVIEN NO.8

ST. FLAVIEN

Not Specified (1189.00-i687.00 m)

Core Laboratories

- LE9END -

Median Value (28i0) Arith. Average (2789) Cumulative Frequency

52 Sample,

CORE LABORATORIES

3

CAPROCK ANALYSIS

Nine full diameter samples were selected for caprock analysis. The test samples were iv aiè for approximately twelve hours. They were then saturated with a filtered and evacuated carbonate brine containing approximately 150 000 ppm T.D.S. at a pressure of 10 340 kPa. The brine was comprised of CaCl2 and CaSO4. Each sample was placed in a hydrostatic core-holder with an overburden pressure of 10 340 kPa and allowed to compress and stabilize under pressure. At the end of this period, simulated brine was flowed through at a pressure of 6 900 kPa. Fluid flow from the core was monitored on a pipette and specific permeabilities to brine were measured.

The source for the liquid permeability measurements was then removed. Overburden pressure was maintained at 10 340 kPa and gas flow into the core was attempted at increasing pressure levels, beginning at 70 kPa and rising incrementally to 6 900 kPa, while flow from the samples was again monitored by pipette. The pressure at which gas first penetrates the largest pores of a sample that is 100% saturated with liquid is accompanied by an appreciable increase in flow rate from the core. This is designated as the threshold pressure.

The threshold pressure for samples S1 and 52 was low, at 483 kPa and 276 kPa respectively, indicating unsatisfactory caprock. Experience has shown that a good caprock has a threshold pressure of 7 000 kPa or higher, and liquid permeability in the range of 1 x 10-6 millidarcies, three orders of magnitude less than that exhibited by these samples.

Although the liquid permeability measured on the remaining samples were higher than the acceptable standard (with the exception of samples S4 and S9), the threshold pressures measured do suggest these should be satisfactory caprock.

VIA Western Atlas International

CORE LABORATORIES

FILE 52132-92-36

COMPANY Soquip (Intragaz) FORMATION WELL Soquip St. Flavien No. 8 FIELD LOCATION PROVINCE

St. Flavien

CAPROCK ANALYSIS

SAMPLE NUMBER

DEPTH, METRES

PERMEABILITY TO LIQUID, MILLIDARCYS

THRESHOLD PRESSURE, kPa

S1 1192.66 1.7 x 10"3 483

S2 1192.98 2.5 x 10-3 276

S3 1193.25 4.6 x 10"3 >6 900

S4 1454.21 1.9 x 10' >6 900

S5 1454.54 1.2 x 10"5 >6 900

S6 1458.10 1.1 x 10-5 >6 900

S7 1458.98 2.7 x 104 6 900

S8 1460.51 5.6 x 10-6 >6 900

S9 1461.51 <1.0 x 10" >6 900

CORE LABORATORIES Western Atlas International

Permeability, mD x 10E6

10 100 1000 10000 0.1 1

Pressure, KPa x 10E-3

0.1 1 10

LIQUID PERMEABILITY vs DEPTH

1192.66 1192.98 1193.25

~ 1454.21 F.:. 1454.54 ~ 1458.10 CI 1458.98

1460.51 1461.51

4- Indicates good caprock.

THRESHOLD PRESSURE vs DEPTH

1192.66 1192.98 1193.25 1454.21

Q 1454.54 � 1458.10 CI 1458.98

1460.51 1461.51

Indicates good caprock

CORE LABORATORIES

CAPROCK ANALYSIS

COMPANY: SOQUIP (INTRAGAZ) FILE:

52132-92-36 WELL: Soquip St. Flavian No.8 FORMATION:

5 213

2-9 2

-M

CORE LABORATORIES

ir ~ ~ ~ ~ ~ ~ ~ ~ ~~; ~; ~ ~ ~ ~ ~ ~

s go, n N et' v g ~ r-Trr

~ In ~

� 00 ~ ~

v~ ~ col ÿ v~7 c/a v~i c~lJ vai

O O Q O O O O C

~ Ce ~ ô ~ 0'S ~ R ~ E ~ .--i r1 r--1 r-1 r-1 Pr .-r 1--1 r1

N V 1 p: vD v1 0p0 O h 00

.-r .-4 rai • 14• N C ra t N ~

~r

(,~~

vl

N

N

~~

G7

I

O

~ N

N

~

O) [~

5

~o .it

cg 6 t-

* ~ ~

N ~~ p ,-4

~

SAMPLE SELECTION

ILY

X-RADIQGRAPHY TECHNIQUES

X-radiography is a non-destructive technique, which uses X-rays to study internal structures

of rock material. Prior to sample selection, X-radiography images are taken at two views

(0° and 90°) to visualize depositional and diagenetic features in the core. X-ray attenuations

are produced on special photographic film, recording lateral and vertical density variations

which reveal changes in grain size, rock fabric, composition and cementation. With the use

of X-radiographic techniques, sample selection discrepancies are eliminated and therefore

small plug and full diameter core analysis will be more representative of the total well. In

addition, X-radiography in sample selection helps to avoid samples which may contain

internal fractures, vugs or changes in cementation/grain size which may alter fluid flow

properties during advanced core analysis tests.

By visualizing the internal composition of the rock via the use of X-radiographs, sample

selection confidence is increased and a greater awareness of porosity distribution and

permeability barriers is realized.

The Advantages

1. Non-destructive technique prior to analysis.

2. Sample selection for conventional full diameter core analysis is based upon X-radiographic observations.

3. Sample selection confidence is increased and a more representative petrophysical analysis can be performed.

4. Able to visualize depositional features and internal structures which are not observed on the surface of the core.

5. Excellent screening tool for the selection of representative core plugs for petrological (e.g. TS, XRD, particle size analysis, Mineralog') and advanced rock properties tests.

CORE LABORATORIES

X-RAOIOGRAIPHY OBSERVATIONS

Sample 1 (1192.66m): Massive, calcareous shale. A partially opened (broken?) vertical fracture is observed at 0°.

Sample 2 (1192.98m1: Laminated, calcareous shale. Moderately dipping laminations are observed at 0°. Note the decrease in density (darker image) likely representing a decrease in the calcareous content.

Sample 3 (1193.25m): Massive, calcareous shale. Variable density observed at 0° and 90°. Nodular pyrite (bright images) observed locally.

Sample 4 (145421m): Massive, very finely crystalline limestone. Trace amounts of disseminated pyrite (bright speckled areas) detected on the X-radiographic images.

Sample 5 (1454,54m): Massive, very finely crystalline limestone. Sample 5 exhibits similar density to sample 4.

Sample 6 (1458.10m): Massive, very finely crystalline limestone. Similar density and apparent homogeneity observed in 0° and 90° X-radiography views.

Sample 7 (1458.98m): Massive, calcareous dolomite. Note the slight decrease in density compared to the previous limestone examples. Thin calcareous filled fractures do not exhibit a significant density contrast to the dolomite matrix and are therefore undetected in the X-radiography views.

Sample 8 (1460.51m):

Sample 9 (1461.51m):

Medium crystalline, calcareous dolomite. Calcite filled vertical fractures are detected at 0°. Note the slight increase in density compared to sample 7.

Massive, calcareous dolomite. Once again, thin calcite filled fractures are undetected in the X-radiography due to the negligible density contrast between the fracture filled material and the dolomite matrix.

CORE LABORATORIES

CORE LABORATORIES

INTR9DUCTION

Ten (10) unoriented cores totalling 62.05 meters were cut from an unspecified formation

during the drilling of Soquip St. Flavien No. 8. A geological description is given for each

of the cored intervals in appendix A of this report.

The purpose of this fracture study is to describe all measurable fractures, determine if a

preferential fracture orientation exists and to discuss the structural and reservoir significance

of the fractures measured. Since these cores were not oriented by conventional downhole

procedures, orientation was obtained through the utilization of Atlas Wireline's

Circumferential Borehole Imaging Log (CBIL). This data was used to determine the true

orientation of the core through routine stereographic rotation techniques.

A total of one hundred and ninety-one (191) measurable fractures were noted in the

orientable segments, in which one hundred and eighty-five (185) are natural fractures, four

(4) are possibly induced fractures and two (2) are induced fractures. A core inventory table

(table 1) as well as tabular listing of all measurable data is provided in section 3. In

addition, a glossary of terms and a stereonet overlay are included in the report to aid in the

use of this data.

Prepared by:

W. Douglas Hamilton Geologist Geological Sciences

Robert I. Gardner, P. Geol. Supervisor, Senior Reservoir Geologist Geological Sciences

WDH/sk

a

CORE LABORATORIES

EXECUTIVE SUMMARY

• Ten (10) unoriented cores totalling 62.05 meters were cut from an unspecified formation while drilling Soquip St. Flavien No, 8. Since these cores were not oriented by conventional downhole orientation procedures, orientation of planar features were based on Atlas Wireline CBIL Log. At the request of Soquip, only 20.29 meters were oriented by this method while the remaining 41.76 meters were analyzed solely for fracture density.

• One hundred and ninety-one (191) measurable fractures were observed in the orientatable segments, of which one hundred and eighty-five (185) are natural, four (4) are possibly induced and two (2) are classified as induced fractures.

• The one hundred and eighty-five natural fractures observed in the orientatable cored intervals display an apparent preferred N-S strike orientation, as they range from 150° to 190° azimuth. Their associated fracture dip angles vary from 30° to 90°, however, they appear to dominate the 60° to 90° range. These fractures have been interpreted as possible fault-associated fractures. In a typical fault-associated fracture pattern, the fracture pole clusters should be approximately 60° apart. In this situation, the fracture pole clusters are only approximately 45° apart. This deviation may be a result of a tectonic phenomenon, however, continued investigation on a regional aspect should be considered to verify their tectonic origin.

♦ It should be noted that structural interpretations were based solely on the available wellbore data from St. Flavien No. 8. Therefore, as additional structural information from other wells becomes available, it must be integrated in order to benefit in the interpretation of the overall structure.

• With the exception of rare, open, non-mineralized natural fractures the formation is dominated by 100% calcite mineralized fractures. The occurrence of abundant mineralized fractures throughout the formation will further restrict and compartmentalize fluid migration within these low permeability and porosity units. Additional microfracture analysis may be considered to establish if the fractures are actually 100% mineralized. Fractures which are only partially mineralized, may serve as good conduits for fluid migration.

CORE LABORATORIES

CORE ORIENTATIQN

Since these cores were not oriented by conventional downhole orientation procedures,

orientation of planar features were based on Atlas Wireline's CBIL Log. The core was

initially divided into core sets, separated by core breaks, spin surfaces and rubble zones.

Once the individual core sets had been isolated, then large macroscopic features observed

on the CBIL Log, in this situation fractures, were identified on the core. Upon recognition

of these features in the core, it was then possible to obtain their orientation through the

utilization of the CBIL Log. A total of 20.29 meters were oriented by this method and the

core sets present within these intervals have a green reference line which corresponds to the

direction of north. In contrast, the remaining 41.76 meters were analyzed for fracture

density only with an arbitrary reference line being used. All planar features (fractures,

bedding planes and stylolites) were then measured relative to the aforementioned green

(north) and arbitrary reference lines drawn on the core. Rubble zones and the core set

contained in the remaining 41.76 meters were considered unorientable. Table 1 lists the

intervals of orientable and unorientable core.

It should be stated that difficulties arose during core orientation procedures due to the

absences of good correlatable features on the CBIL Log. In general, mineralized fractures

are rarely observed on any of the available imaging logs thus significantly decreasing the

ability to properly orient the cored interval. In this situation, the majority of the natural

fractures are mineralized and there is a notable absence of correlatable features. Therefore,

the overall confidence in core orientation was decreased to a classification of moderate to

locally good. As a means of overcoming this problem, a secondary means of core

orientation may be considered for future projects of this nature. Two methods which may

prove beneficial are paleoma_gnetiçs and conventional downhole scribing techniques.

Fracture Data

A total of one hundred and ninety-one (191) measurable fractures were observed in the

20.29 meters of orientable core. In addition to orientation data, table 2 lists depth, vertical

length, width, fracture condition (whether the fractures are open, close, broken or

CORE LABORATORIES

mineralized), type of mineral infill, infill percentages and also the origin of each fracture

(natural or induced). All measurable fractures are listed on the Corefracture Log and

Coredip Log which are included in the appendix of this report. The fracture data obtained

in the unoriented core segments is also listed on the Corefracture Log and Coredip Logs.

Actual depth measurements of the fractures are dependent on the core depth relative to log

depth, therefore, adjustments may be required if variations are noted between the downhole

logs and the spectral core gamma or bulk density index curves.

Fracture widths are measured using an optical comparative device which can record fracture

widths to a minimum of 0.01mm. An assigned width of 0.01mm is given to all broken and

closed fractures, since these fractures can not be measured using normal macroscopic

techniques. Based on laboratory data, Nelson, 1985, suggests that a standard width of

0.01mm can be attributed to fracture openings at normal operating depths. Effective width

of the fracture differs from the measured width since the effective width is the actual

opening of the fractures. Measured width includes the width of the fracture and also the

width of the cementing agent filling the fracture. Fractures which are 100% mineralized are

given a default value of 0.001mm for width since these fractures have little or no porosity

and will actually inhibit the migration of fluids. Induced fractures are those created by the

coring process and are identified by using the criteria advocated by Nelson (1985) and

Kulander et al (1990).

The orientation data of all one hundred and eighty-five (185) natural fractures observed in

the orientable core segments are graphically represented in figures 1, 2 and 3 with their

associated dip angles plotted in figure 4. The natural fractures appear to have a preferred

N-S strike orientation, as they range from 150° to 190° azimuth. Fracture clip angles for all

observed natural fractures range from 30° to 90° however, they appear to dominate the 60°

to 90° range. Dip azimuth data indicates the fractures dip in both an easterly and westerly

direction. This phenomenon is graphically represented in figure 5.

The vertical length of all observed natural fractures are listed in table 2 and vary from 1.5

to 48.0 cm. Calcite mineralized fractures dominate the natural fractures observed and are

CORE LABORATORIES

predominantly classified as 100% infilled. Those mineralized fractures which are described

as broken have been issued a percent fill of 0% as the actual percentage can not be

accurately determined.

Bedding Plane Data

A total of seventeen (17) bedding planes were measured in the oriented segments. This

data is presented in table 6 along with the distribution of bedding plane dips, azimuths and

strikes in tables 7, 8 and 9, respectively. Bedding surfaces display predominantly sharp

contacts and generally have a planar or wavy morphology. The observed bedding planes in

the oriented segments of the core display a preferred N-S strike direction ranging from 170°

to 210° azimuth (figure 6 and 7) with an average dip angle of 5° to 25° (figure 8). Figure

9 indicates that the observed bedding planes have a preferred w terl"y dip azimuth, as they

range from 60° to 120° azimuth.

Stylolite Data

Tables 10, 11, 12 and 13 provide a breakdown of the stylolite data compiled during the

examination of the core. A total of sixty two (62) stylolites were observed in each of the

oriented core segments. The orientation of these stylolites appear to be random (figure 10)

with dip angles ranging from 0° to 90° (figure 11).

GORE LABORATORIES

DISCUSSION

The primary purpose of this study was to determine if a preferential fracture orientation

exists within the formation. In addition, an effort has been made to determine the structural

and reservoir significance of the fractures measured.

A contour stereonet plot (figure 12) of the one hundred and eighty-five (185) natural

fractures observed in the orientable core segments suggests that the fractures are possibly

of fault associated. These fractures form an association with faulting either parallel to the

fault plane or conjugate to the fault, as illustrated in figure 13. A typically fault-associated

stereographic fracture pattern is illustrated in figure 14 and highlights the occurrence of two

clusters of fracture poles which occur approximately 60° apart on the stereonet. In general,

it should be noted that the recognition of fault associated fractures requires knowledge of

the regional structure which was not available at the time this report was generated.

Therefore, structural interpretations may vary if additional regional information is obtained.

This interpretation of fault associated fractures is based solely on the fracture pole

relationship which appears to be present. Although it does appear that the fractures can

be described under a fault associated fracture classification, there are concerns which should

be addressed. The most significant of which is that by definition the pole clusters should

be approximately 60° apart, however, in this situation they are approximately 45°. This

deviation may be a result of a tectonic phenomenon however, continued investigation on a

regional aspect should be considered to verify their tectonic origin.

With the exception of rare, open, non-mineralized natural fractures the formation is

dominated by 100% calcite mineralized fractures. The occurrence of abundant mineralized

fractures throughout the formation will further restrict and compartmentalize fluid migration

within these low permeability and porosity units. Additional microfracture analysis may be

considered to establish if the fractures are actually 100% mineralized. In the situation

where a fracture is only partially mineralized, it may serve as a good conduit for fluid

migration although, fracture/matrix interaction is usually negligible.

LIST OF TABLES

Table 1:

Table 2:

Table 3:

Table 4:

Table 5:

Table 6:

Table 7:

Table 8:

Table 9:

Table 10:

Table 11:

Table 12:

Table 13:

Core Inventory

Fracture Data - Orientatable Segments

Distribution of Fracture Dip Angle

Distribution of Fracture Azimuth

Distribution of Fracture Strike

Bedding Data - Orientatable Segments

Distribution of Bedding Plane Dip Angle

Distribution of Bedding Plane Azimuth

Distribution of Bedding Plane Strike

Stylolite Data - Orientatable Segments

Distribution of Stylolite Dip Angle

Distribution of Stylolite Azimuth

Distribution of Stylolite Strike

S

}':_f:i:5 $$~f iv:,:r.y,.;•y «${:}..; {'•:~: !w: : • . ~ n ~• . GA:*

:u: .:...:..........s . ..

..$.r`i?.•. . . ..

::::r{... . .... ::{•.':{:}:?..... ::

...........n. : . • ;:}.;... ~~:'.''•"::v.

$ ?'.•: .. . SrF: ~:>?Ÿ t$`:=;:;: ï $R:>5:!.:; r.:: : :${:: .. $'• cc:'{ti; ~: ... ...~:

~~Y}. :. . . :.. . :.. . :<.....}v.:~} ~{"{

:•:>}+:::: }:; G.d,c:~x,4fr:.ù'<;~':: --•' . s - : ~:;: :•:{•.. . {.. ..... . ::{:,-?:• . .: ~:: ...v:: •.:9:4 .... . • :{:o-::::..•_: :•::: :: ... .. ...:..,,. . - -' .~:: .... - .......:...:::.:.. ::.::::.::C• :•r.:.::::... ::. .. . : . . . ,..: . .

.i:-;a:;•}:: ~;~:•:s:::.;;~;.~:... . ';'<>:>'$ : .}:. :.4'. :.$::: :}.-%".'..:~•} .Gi: ti:'Pji •:.,4 ,•~iv :''C'r' }'\~:: ;.$ . " •:.~::} :.•:~Ai:i : -$:: +~~ $.4•• ..0.1~{tiv:•:v ...s < .•::ïxr •::G'{' . ... .... .. :;~!:•} ..,.r:'Ÿ:}'r.':> .....

_:ï .,,,• . :...... .~::...:....,...;..::...,:>.~::...:ïï:.::,.:::.}:•~:«.F.;::.. -$:~..,..:..:. ...:::::,::. .:::.::.,

X

'.~. ~. 'a~8: r: -a~: ,~J.•:

•r'~{...... çç.. 4v,.,%::ti f: ... :v: ;~v't:ï}•~•i'tiv $::"~:: :~a%Cli}'*':. ...r. . n ... .. ...>.,.. .

:::{.}::-

:{:: •' :-• ?::}i<.::ï: ..,. :~G•' :::$}'::yt ''::::'~'}s . .. . :.~•'' -.- .. v .~.. .. .:

•.•P~a r :.,:'}:Y~w;,~:: .. Y.... .. ...1..;.°',7.. :} {{::nl : p :;: ç:ii}: ~ ti.{}..y,v:•;4: fG .~.. y:{•3'' C ::F. .:1.. •:~:~v}..... . .. .... ... .

:....::::{.;: {':. • :: :ti::ttf}::, ~ }{}''.t :.... .r .

n:::..'::...::. •::~ . :.:::.:..}.:.:,:...::: ,.:..~:~''::::;: •..: ~ .r.. ..,• ::.{... r4::-.

x ' <e^•t X+t{:' :v}iti:}i'~i•'}}{titi{\

5,..}}:{:: •:: ::. . r. ';:33:i?::ti:~::~:-':';:~^-.'~r:~'::';::::+ ~'::•'.:`f::i:`r:i>„ti?:}';'•.i;:i .::.>........{::: : .. .

X

X . 4 , {..

....t.t.." ,,{{~~-..;

}:. a{ t...,....' ,...:..:-.~ .: . :..:.:...,:.. ..:::;:.:.-..... <;:.':.. a +• v.:

~,i.",y'. ..4 ....}: ~~~? ~ ''~ ~::•:::. . ,.:i:'-:.: ~r•:~ .:. • ....

X

~~[[.

..j~zt1':.k

1488.90 - 1492.17

i; f::- :•~•'::i`?}\ti~~->:. ~;., `~ ~. ...i~~~~'.~i

X

;,?,

GREEN

_i:'h~.'-:•.•::~:'''-~': ..~. YC. ~~::~.::•:: } v''\i$i:•>ï':ti~::::f:•:•::{{:~i: .. } ti Jr!;S~üa;,::;::i:i:~i`'s'•••':;`:":i~f}i:::;•::i:6:<t"}iE:~i`?''..':i%{'.• '' {'~;~

i ..x::',t}}:?:{uv:L:`:};$•:~,:~: . , .. :::f,•: ~' Y;}:::: ' h. `. ;: ^~`: • {4}$:.}}}. #•:-:~.. •.~. ~. h. .. :, ~. Ÿ4... :S": •.... . .. ., . ~\::•;' :$: {::::vi%.::: ti~:4::~1 ~: ~;!?}: ti}:::~::v:::v^. ':tŸ•' ,

{•{}{

`.:^hi. . ..... ..... .. y`.\'i: . +'~ii . .... ... . .. ,..~•.. . . .. . ~3i:•s , . .: . . ..~.> ::2:i' . . • ;....,..N.».,.,r .•.~.....

TABLE 1 CORE INVENTORY

DEPTH INTERVAL (m)

CORE #1 1189.00 -1192.25m REFERENCE

INTERVAL ORIENTATABLE

NON-ORIENTATABLE

LINE COLOR

1189.00 -1191.60 1191.60 -1192.25

X i::«; .:: f:'•-

:}.: . :..........

CORE # 2 1192.25 - 1194.65m

1192.25 - 1194.45 1194.45 -1194.65 1194.65 - 1454.00

CORE # 3 1454.00 - 1457.50m

1454.00 -1456.55 1456.55 -1457.00 1457.00 -1457.50

CORE # 4 1457.50 - 1483.05m

1457.50 -1459.36 1459.36 -1459.66 1459.66 - 1462.50 1462.50 -1463.05 1463.05 -1485.95

~: :{iti::~: }V: r':::Y~?.''<'~e:x^~`?{< Ÿ'•:A~,•••.y:

WW. ~tl]:C }:+4: ' " •~ .~ ï:4• .#~kv.:~:-5:::' z.,-t:..:,. .r::$

'.~il• ?:~^~:.•~:. •.44'~ • 1>. . 4..

:. ~ ..

....:.:....,..... .,.. ......::..>...._. .,.~:.i.,

:: }:: ~<: :.ti:....~°x'i~:Ÿi %' ~:;.i ~;{:i: ..{,: {.~.:: f,:;~::sa:•; . :4Y•: :f•.: r •;i-:. .Y.-i • ',;qC â$: :':?:•}'};• x.. .:~ `:G}•~

. . . •: ~ : .•..

~• i'. :.rJf.r6-:. ~\.. ... •$:G"v:.v }~i}. . • :::..: • .,.......::::

?- .::... ::. . ~ .....:. ' . . .......s .. :.: '.... i:.~:••::•

..~. ~.. ~ .. .. . . . ~:........... ~. .,•~.• }~. ~ :i: ~<2~ :..~.~~ :

•i:4;{{.. •:n:: %tiih:.....:}••{:ti:~:{;;ï::i: ~. : •.}v..:.:.,r. :•: Qi! "'}:G ::.. :...: v... •.v:.:.:::.4: . :,i;,{:<,,:;:..:}:.:~ ~~ ..... .. ...... .... ....... . ...... . . .

CORE # 5 1485.95 -1496.50m

1485.95 - 1488.33

X

GREEN

'~`'> :~: a;:;~~~~$; :;.~,

.. . .. .. .~.r

1488.33 - 1488.90

X

GREEN

x -

149217-149422

X

1494.22 -1494.72

X

............................ ...... ~~~r`... 1494.72 - 1495.29

X

;: :,;•:;: i':<;3:; :"i;:;;;:?; i:2 r r ..:x.`i~i?:i::':;;:i~~~•':::.{~:::::.:~•:~i':c::::>':•::....:r.•.. .....................................•..~...~... :n4a--~:~.:..{i: ='::•::::}:

{;i:.fi.

X

X

00iiit WEAK X

1533.50-1533.85 1533.85 - 1535.00

1526.22 - 1527.63 1527.63 -1527.96 ;~:~'::~•~ :~:>:::«:~;~r<: ~~;;~:.>:::;:>;::::»: .: 1527.96 -1532.69

1532.69 -1533.50

.........• .....

CORE # 6 1514.00 - 1524.25m

1514.00 -1514.56

1514.56 - 1516.70

X

110.00(

X

GREEN

1516.70 - 1517.65 X . .,..:- . ..•.. . .. .f...._. . .~... .........

GREEN ;:-,:>,: :.'; ' <•::;::=:;:<:>:}..»}::,:<::»:•}::;:;i<ii:,>::»::;,.::»;:.:;::;:. ::::.:..:::.~::::::::.:v:.-: v:ii:•}•:::.':::.

1517.65 - 1521.71 1521.71 -1521.81 i •i

1521.81 -1522.18 ~•'!

iYW::;::~..:~::.r•

....:.. n .. .... •:.~:i:':-•..

• 1522.18 - 1522.38 1522.38 -1522.65

1522.65 -1524.25 1524.25 -1524.50

CORE # 7 1524.50 - 1533.65m

........ 411)EdtX.: ..

..............: ............ ifL':if~:{i:;:??i:i:;t!~!t:ti:;`i~i:ti:!:::~:~..........-............. .....~ .... .. .. . . . ...

GREEN

X

X

1524.50 - 1524.72 X ..; . .. ........ ~:a~`\•:' •i:fr+ p: T~..~:};:..~--::..~~;- - .i,4.. ::~. }. ~~~. n..r .^,... .• v}v' :i~~•ï ,::: .. :....... ~.~....,.. .. .. .,~ . ':.,i::{::{{:.:.. f .:hf :.k. ~ •:.: :::::::. ...:••.::'::.; tij:\: i: i'? ~:' •:~,. u' is~;t ;{fiT?i: :.T.< .•}:•-~' .a .~:+• i<;:i~$: •:3v: ~:s<::-. i.:<Sii:h....:•:2i •:.{..> .:c4.'• :•9 '•~9;!:::iï%''^:~ :vk•'~f,.. :i•%:•'~. • ~:tir. 1::', vnn: i`}.,•:::. :'.;,:: }.:::.. ..,. . n.n•:;:}}:.:{{.:{..:v.}.. y, • :' .:::.~::::.v::...4}v ,. •. .~ ' ~ ~~~~M(y,~~.~.I.!F; .. .. ~,•:.~::.,:{v;S:•} ..:.::... C•+'v: '}'~~f:•f'✓~:~M. '~.v.i: .~f 'v ~~i;::i::i::;~{ . :%}i: jr~i.T.•?'l.!ï•?^'.'•{:T{.:i::.........~~ ..... . ........ . :.. :.. s_ ........... 1524.72 -1526.22 X .<:...::.... .:. . . :.:. ;,,,m:::.::::: i,,::, :::.......~....... - .:• .. .

.....:ï::::..~;........ . . ..: :..........::.;~:.:.,: ~.:-.::-.::-; .._...:.:.:.:, . . ... ,,::.:.,-. .. ... • - .....:.........

, :.\:..... . {~.n^A. : •4:•:;:-. :...........• .: ' ' ~ :......... •vv.:v ..:: ::::: :;~ ~ :....:: ::: .......... :.:•.:v:~; :........... .. . ii::•::. . ....'• ,v:..... • ..>•:e::`:h::• .v....... •:::~Ÿ`.' ~?~i:-'.:~'.:i~^::}:::::::ji::::::Ç::;;:::>~i:":i<y:;.

...................:......:i.i. ' • ..~::.:............ ..::::: . ., .. . .................:.~:: v; :. v.•'.i~ ' .•. ..1Li{tivi: :'•::,•:::::'.~:.:::::.:: ~.. :•:.....::........ ::~ ' ...

.•v ..:....::...........:.v ~..~i.: '•'.:••' ::..:.:..-...... ........ . . :.:;•,::::::..~:::...~~:r::v::{i::}ii::,.'{?.:.;:::9:::~ii:~}iiï~ii::i%:!::~:x.

:.c.. ,, ol~'::.-.~C'•:: • .:di:: •:.~::::ii+::.. . : .~~ .~...•. ~.: iT`'•

:: <:::< <«:>:::>:::;::::::.:;:•,:>;::»::<::::<;;';::;:::<s::::;v>:>,: n l, 4..,.. ::i{+ : •w: •.:a+•+ k ":5;fi3?3>ir5f; k:... ..\:: •: :~ -,^ \C:',:`:~:;::ii;; ':v:~Y':::.: y:i:?~~'i,'-i:;.:'i:: n~ ;}i:.~`.; :?.::ti~:::~ .:,:: .. i•ÿ::::5~:`':~ :~:::::ti \ • i Y ... - .".{:~, :•:': :, •.,: :' t..n.n.~~. . : , • :

1495.97 -1496.05 1496.05 -1496.50 1496.50 -1514.00

..............................

.~~;~i%x~i; :; G:: .; ~~;•„:;:~; ;~~~;;;5?:;; :~.`:~':;k:;~:>i~ii :::i{+<'. ,' ::: ........... . .... . .. ...; . .......... . . .

X

! \~ + y .

.: •..~. .. . ,'..~. . .. .4:

y.'~. ~1: . .•~T, • m

X

WNW ..: ......::':.:: .....

.: -.. ' ;::~#':::<:r::

.

....... t:.......:: ~;:«:~::`::`' ..:.'~ ..,. „.. ..< ,u . ;:

, . :.....>:;.:~. ; : ..~-.~

>::. .........:

INTERVAL ORIENTATABLE NON-ORIENTATABLE REFERENCE LINE COLOR

1495.29 -1495.57

X

1495.57 -1495.97

X

X 1535.08 - 1536.32

X

X

SuRFACC, 1536.32 - 1538.71

1538.71 - 1540.00 1540.00 - 1672.00

44.inA.04.4

CORE #9 1672.00 - 1674.70m

1672.00 -1672.52 GREEN

GREEN 1672.52 - 1674.60 1674.60 - 1674.70

INTERVAL ORIENTATABLE NON-ORIENTATABLE

CORE #8 1535.00 - 1540.00m

1535.00 -1535.08

REFERENCE UNE COLOR

X

....................................................................................................

CORE # 10 1674.70

1674.70 - 1675.00

-1687.00m

X

....... ... : ..... .. ... .. . 1675.00 - 1675.20 X

1675.20 - 1676.53 X

1676.53 - 1676.95 ., -..."

" 1676.95

96 X •••

1677.96 - 1679.60 X

1679.60 - 1680.42 CORE BREAK

1680.42 - 1681.25 X ... .. ..

1681.25 - 1681.64 X

1681.64 - 1683.29 X GREEN

1683.29 - 1684.33 X 1

1 REFERENCE UNE COLOR INTERVAL NON-ORIENTATABLE ORIENTATABLE

1684.33 - 1684.44 X

1684.44 - 1684.88 GREEN

1684.88 - 1686.08 GREEN X

1686.08 - 1687.00 GREEN X

.. ....... .. 1 .. ..... .. .. 1315's.:14:0:0;afsFiaRgatl

GREEN

ââ Uu ââ U â~â aa Oa Ef-1 03E01 E a

!l) t0 H 01 CO W ih H

aa 33ââââ2A g2 Lt2 Lt= Z3 ô~~~~~00~~ ô ~ ~~

C1 Or, CO d' C1 t0 ri 01 ri ri r1 C1 U1 N er C<

gC g407 N H H OD U)

ri ~~ CO C1 CO I- I- CO [- I- O

â â W W E W W E

WW H OW0WH C4 114 Nar7a U1unlr+00rn01o1r1cV000roc11 MOrio,

I` n t, t0 VD lr l- l- CO cO ls Vo ko t0 V0 Vo V0

C) CJ g a H w o

0 E H

zzzzzzzzzzzzzzzzz

N N N N N N N N N O 0 0 0 0 0 0 0 000000000C3000❑000

° a

x H Û

H 1.1 W

E W H~

a z E u A

z g© O w V u

hui .

m

C) W

Z gN

H Û W

IX g C~7 14

w wW › W Kt 41 NH

Z â aaa â w2 E

H CI W 3 0 z

41W

cm

W UzW g

~

I ~ââ

H o~

•,:40 ~ 3 N ••W

43 N E .G'

H a âz

~ â ~ 6 H ~ W

o E a E

gC w W

a 5â ~a O ~zW

a +~ o

4 X

a 43

~ââ

C4 E~ w

© o x U 41

H OW

C ❑ H C7 NW •:4 C]

~ • c24 E-4 14 W E W W ❑ ~

O o 0 0 O o 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl 0

0 0

ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri

O 41.44aa0400000aa4a ÛÛÛüÛÛÛÛ ÛÛÛÛ ÛÛÛÛÛ

zz z zzzzzzz Zz z Zzz

ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri O O O 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . • . • . • • • . • . . .

O O O O O O O O Q O 0 0 0 0 0 0 0

O O O O O o 0 0 0 0 0 Cl 0 0 0 0 O O 0000000000oOt''1u)oo O ri ri d' Crf ri N M ri o 04 .-I rl 01 10 O N . . . . e • • • • s . • . • •

N N 1p \0 ri CV O O U1 Cl N rl r•i O O r-I mi ri ri ri ri

OOU1U100o U1U1 4ONYDOOUIYD0C1

. . . • . . 01 ri N d' d' r- r 01 1"1 U1 O1 ri r1 Q' N M O U1 N d' ri rm U1 d' ri Ci U1 00ChC1C1U1U1U1U1 030003C1d'C1ONoOChO03C1 CtiC► 01010 ririririNWd'd'd'd'd' r1 ri ri ri ri ri ri ri ri ri ri

1 1 1 I 1 1111 I O M O U1 U1 U1 O tD O U1 U1 10 CO t0 O ri 00 111 O 00 00 ri M 00 d' qD Tr oOOd DU1 OMUOCO► riMU O ~D I~ 01C CN NN1•1 r1 g0' . .. . . ..... .. ......... ...... C1 0 r1 Nt. V' 0 f, Q1 N 01 Ul U1 V0 VD 10 10 10 tD VD I, I, I- I- t` [- 00 C1 C1 C1 CA U1 U1 U1 %D CO CO CO 00 00 00 O 00 CO CO 00 CO CO 00 CO CO CO ri rl rlrlrlTrd'st'd'TNTrd' mir d'd'd'd'd'srd' d'd'd'd'd' d' d' rirl r-l riri rl ririririri ri ririririr-iririrlriri ri rlririri

ST

RU

C F

LU

ID

< A

zzzzzzzzzzzzzzzzzzzzzzzzzzz

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oA ❑❑❑ o ❑ Ao ❑❑ o ❑ A ❑ A ❑❑ oA ❑❑❑❑ o ❑ A

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri

:2 :2 :2 :2+2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 :2 V VVVV VUVUUVUVUVUUVVVUVVVUC)

zzzzzxzzzzzzzzzzzzz•zzzzzzzz

ri ri ri ri ri O ri ri ri ri ri ri ri ri ri ri r-i ri ri ri ri ri ri ri ri ri ri 0 0 0 0 0 ri 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O o,0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . • • . . . • . . • . . • . • . . . . . . • .• . .

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C1ri00U1ri0 riNO0000erM000C100t000 r-i OClN M d' ri ri N O d' N M O N ri N ri t0 N N N ri 10 Ul ri ri Qt C► ri ri

• . . • . . • . . • . . . . • . . • • . • . .

0 o i'1 ri O O N O O ri N ri • ri 00 0 0 0 00 0 0 0 r-i N O N 0 0

d' Oul 10 C1 Ul 111 ri O O t0 03 ri M t0 ri un n tn ri r- O Ct 03 sr Cl N . • . . • . . I • • • . • . . • . . . . . • • • .

Ohs'Nf'1d'ArGhriUOMNQLL1MO0riV0111Nd'[-i"T (il rI0O NUl ri N ri N N ri rl ri ri ri ri ri ri

C1 Ul N O d' Ul Ul ri t0 d' d' 00 I- N CO O N 00 0 1l ri d u, eg Ar M ri [-r- Mr-r-Ar101-ti0(,10t01-[, r- r- r- r- r- r- - r-r-r-cor-

Ch1:1NOdr1111f1ri ►D d'd'001-N000N000U1 ri Ar 10NArMr4 i- t- ['1 1- t% d' t0 n 4) f- YD 40 n n i- i- r- t0 l- r- i- 1-- C- Or-

Ch M tO N CO r• N M Ul U1 Ul ri 0 r- d' I- Ch ri 00 C1 C1 M t0 U1 Ui r- Ch tD 40 00 C1 O P1 00 N d' d' I- C- r- d' ri n CO O O 0 111 ch 00 C1 d' Ch rir-Iri riM riMM MM MMMM C'1

d' ri rl N N CO d' M O U1 01 M 10 U1 Nr- M U1 00 ri d' ri M Ch 0 40 r- N M d' U1 Ul 40 Ch O M N d' Y11 U1 1- 1- d' 00 00 C1 Ch O N ri N ri ri

• .... • . • ... . . . .

P i- i- i+ r- t` r- 00 CO C0 00 00 00 00 00 o0 00 co 00 00 00 C1 at ch Ch Ch ch 00 0 00 0o ci) co CO co co 0 0 00 op co m m oo ao co co co 0o m 00 op ca o0 •d'AtArArar V'd'srsrdvd'std'd'd'srd'qtd'•il`d'tl'd'd'd'd' ri ri ri r♦ ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri

I., a

Z 1-4 H Û

H 44 04

E w

a za

O ~H

N UO

z g

O fs. Û

c.) O H J

w a

u)w

0 ~~lx

H Û W u)

Cg g 5 w

44 44 pl >

>1 04 cal ci)H~

j x

H 4 x Cg 0 W $~

CD wD U W z W EI ~ H W

i ~ âH ~ A E

04O 43

En ..w z

m N É x

H

âz âc E~x Q'iCI H V

.7 w ° E-1 i-1 H

gg °w w

C4 gâ â o Coc.1cn

CIZ ~ ca

~

a w w ww • 1-4 Cg

x Eâ w ❑

o x

U w 04

❑ HCa7 N w 14 ❑

zzzzzzzzzzzzzzzzzzzzzzzzzzz

O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 00 ❑❑❑ 000 ❑ Oo ❑ o ❑❑ 000 ❑ o ❑ a ❑ o ❑❑

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri rl ri ri ri

aaaaaaaaaaaaaaaaaaaaaaaaaaa c~i ~û c~i ~ûûÛûû c~ic~it

4i ûûûûûû c

4ic4i û c~i ûûûû

ZZZZZxZ ZZZxZxxxxxxZZZZ Z ZZ Z

ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . . . . •• •• . .

0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O N O N O O el ri 0 0 l- l- N 0 0 0 0 10 0 O O r1 ri N O O ri r1 r1 r1 d' N O d' O CO Ch el d' O1 ri el U1 1D Ul1 ri el CD ri d' CA ri O ri

. . . . . . . . . . . . . . . . . . . . . . N O el O ri ri 0 0 ri N O O O ri ri ri ri O ri ri ri O O O ri ri O

Ch O1 r7 O O H 10 CO N 1D 1C 1 ri CO I-- 111 CO ri N d' ON Ol tn ri Ol l- . . . . . . . . .• I . . . . . . •.•

I-d'NCO100 NCOlf1NrO\d'd'OD0I1lriOlflNNNv0101f1 I~ N ri N ri ri r1 ri ri ri ri ri ri ri ri ri ri ri N

d'OIriNCOM NUIIfINILiOII-I`r-000Id'UIIOIOOUI MNC10101 I` I` O OD Ar CO I- I- r- t- l- 10 10 10 10 10 10 [- 10 10 10 10 I- I- I` r-

cr01riN00MNUlUINIll01t-C+l-a0Clerlll0lCO tnr1Nr14101 C- [- CO 00 d' 0 r". r- l- I- l- 10 1010 t01010 f- 1D 10 1D 1D [- [- l- 10 f-

10 r1 ul ri Ui ri el O1 M Ill h O Ol 10 L- if i ri C1 d' N ri C'1 10 N l0 ri O Ch Ch ri r1 O O1 00 01 ch d' 0 ch ch ch CO 00 Ol CO O 00 d' d' er CO I- 00 r1 ri N ri M ri il ri ri N

I- d' 10 10 1D Ul ri d' CO 0 el U11 10 ri 10 t- r` co 0 10 ri ri O r1 CO ri O ri i- el CO O1 ri cr d' d' r1 I- CO CO 01 O1 O ri ri N N ul f'1 Ul lll 00 L- CD

.•.•. . . . . . . .•. . .•. . .•. . . . . . . . . . .

Or Ch Ch Cm O1 O 0 O O O 0 O O O O ri ri ri ri ri ri ri ri ri ri ri ri O 03 OD CO oa a1 01 O► rn O1 O1 a1 ch cm O1 Ch Cm O1 01 Q+ Q1 O7 01 cl Ch c1 O1 mrermr mrva'mrsrmr mrmr mrmrd'cr mr ce.rmramr.rcr mrmr mr mr ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri

O a

Z H

H w R•

Ei w

a z a

O XEi N U ❑

Z ~ z O W Û

U ❑ H .7

US a

❑ w

0 Z nH â

H Û W ü

Z g 5 W W WW 9

Pd 441 U) EHiExi

Z EiaW o H

40

Hal w~

0 WD U W

Z g cn cl

m H M W W UzE

5x

1 ~w aH cil w ~ô ~5

to ,, w 43 N

Ei Tr w â~ z

Z H

H ~ W U O a Ei

4 ❑w w

a gâ â

O ~ c3 W

c0 ~ ❑

.14 X

a w W W W

41 cd 0 u

IX EI 4w

A o x

✓ H IX ai ❑ H U' N W d ❑

al 04 ZxzzzzzxZzxxzzzZzzxzzx

❑ ❑

0 0

O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04.>~ O tn O 0000000000000000 ❑ w w ❑ a

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ri ri ri ri r1 ri ri ri ri ri ri ri ri ri .-i H r1 ri ri ri ri

• 0aaa4.14a41aa040004a 41-44 Û Û Û ÛÛÛÛÛÛÛÛÛÛÛ ÛÛÛÛüÛÛ 0

z C.) ti X X XXX X X Z X X Z7"wX X X X XEGa

N U3

00 r4riririr-Iriririririrlririririrlrir-Iririri0 ri ri 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ri O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

• • • • • • . •

O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O N ri O O O O CD >n r 0 0 0 r 0 0 0 0 0 0 ri C1 0 CO 00 N rI Cl O O r r1 111 N C1 00 0 Ch Ul 0 0 0 0

. . • . • • . • . • . • , . . • . . . • • •

00 rIr100riNririNOOrit1NOMVOf'!f`1VOd'O r-i

co tn r1rMtOtilOrl ;Na d' 01 C,r^1 ri r 00ClOOd'COC1C,

. • • • . • • • • . • . • . . • . . • .

C1 Cl a Cl N N Ch 111 ri 00 Ch r r ri 10 rl Ch r N CO 0 ri N N Ch gt

NNl'1ri rlriClririNd'd'Mr1 N

x w H W xx

â H N

ch r- Od'OrCl111r-Irlrir,OqOr-ier rOr4010eriflr ✓ rÛ W W rr rrr r0raao0oo000o0oa00oao000or

Ei a CO [JiHC11

ch r pp p4 .0 O d' O r rt tn ri r, ri el O w ri d' r O r d' ln r ✓ r r-4 ❑ wrrrrruvrrcoraoco000000Oo00000mr

00u1 ul 0 10 ,

ln r1 40 • d' d' ul N M ri Cl d' 00 Cl 0 d' Ch 40 ri Cl N t0 r, N 10 r un rlrlClrirlrid'lti Nt. rllnriNtnrrm0el11110 to t040 rrrd' C1 Cl Tr ul ln ri N N N N N rl

ri ri ri .

1 1 1 ~ ~ •~ 3 ~ •se-- ("- ~ •,t >~

q) r 1n 0 40 O r1 03 r d' r, r1 O 00 to 1n d' 111 Cl O N N O el M0 00 r 00 00 0 111 0r000000ChriNNC'1Tr,0l0CO0ICINNMrCO rid'

. . • . .•. . • • .•.•.•. • ri ri1010d' ' d' a nt d' 1n11i in 1li ullfi 111 1111ri 1n 1C1 10 ‘O Va i

• 0 r C • ,

C1 Ch C1 C, ri ri ri ri ri ri ri ri H ri ri ri ri ri ri ri ri ri ri ri ri ri ri d' cr d• d• 1n <n 1n ln 1n ln ul ln ln u1 1n 1n u1 ul ul 1n 1n ul 1n lfl 1n ul lfl ri ri ri ri ri ri ri ri r-1 ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri

'I

00 ri ri 00

O0 ââ w o o x H H

~ a H w a

H• 9+- ME-1 U❑ gz 4.0

❑ H :D

~ w

W U

VF â uHi

g5 w ~ N x

H â w ûc~ KC o4 cWx+3 W~U W

~ ~w

~ ~w EEEwââr~ a0

.. W N x H x PH az a26 ~ H ~ w H

❑ W W gzââ

M w ❑

w W WW â aV' aU' El Ô

❑ H 0 N W a ❑

cr4

[x~ a C4 EW W E ❑x

r~ zzzzzzzzzzzazzzzzza

N N N N N N N N N U1 N N N N N N N N N aaaaaaaaaaaaaaaaaaa

O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O

ri r4 ri ri ei ri ri ri L-1 riri

~~~~~~~âââ4 ~~ ~ â U UUUUUUUVUU UU U U

x x xxxxxxxxxxxwxxooGfaUGpm

r1 ri ri ri ri ri ri ri ri ri ri o ri ri o 0 0 0 0 O 0000000000r+00r+r-+r+ri.-i O 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 . . • • .• • . . . • • • • • . •

0000000000000000000

0000000000000000000 O O O U1 O M ri N O 0 0 ri O O ri ri ri ri ri d' O ri d' 11l d' M M N CO N O0 C1 0 0 0 0 0 . • • . • • • . • . • . • • • • • . • ri N N O O 0 0 O ri O ri O N ri 0 0 0 0 0

ri ri O M 00 ri S.0 ti0 O O M Ul N N N c'1 er OO [s . . • • • . . . • • • . • . . . . • .

%0 1- t- O C1 C1 N M VD t0 O N C1 0 CO OVD 111 U1 a 44 r♦ ri rl rirlri r-ir♦ r1 ri 04 44

â ââ W WW MME-MM HH zzzzz zz

U1 M M~ 1s M 00 N N O C1 ri CO 01 N l~ U1 i~ M N N H NN a H H

t~cOOOOOtswlsa000O0t~U1VO1s1s M04Ot- %O 0 O C3 W W W W W U W W

mmâ aaa m H ââ U1 M M~ r M co N N O Ch ri CO C1 N 1s Ef 1 r-, en a .`J ai ;7 :D p

03 03 1-4 pp 03 ~ 04 ai

✓ aaooaoraol-cooacor- ulVo r-rvator kt) GGo4 ❑ o4a ►-7 ❑ Cl

.-i000NVDu100 CO M U1 10 01 00 0 O . • . • • • • •

10 10 O l- d' 1- d' el %V l~ Ch M ar C1 U1 t0 U1 C1 O ri N d' VD t`- M U1 N V) U1 111 U1 VO nt d' U1 111 d' d' d' VD U1 Ul t0 t` U1 V0 N N N N N M M r-Ci N N N N N ri N N N N N N N N N N N U1 U1 Ul U1 U1 U1 U1 \0

ri ri ri ri ri ri ri ri

O ri rl N LD d' t-- 01 C1 d' 10 ts d' U1 U1 O 01 M N ri O U1 Cti M O U1 0 l- O0 l- CO CO N O N d' d, U1 I- 0 0 M VD C1 d' U1 l` O N cY mD Ul 00 0 .•. ..•. • . . . .•. . . . • Cm ChCh C1Ch0000000ri -4 riN d'VOr- C1M0 ririr-Ir-le-INN NN NNNNNNNNNNN NNNNMM tl' U1 U1 U1 un U1 U1 u1 U1 U1 U1 u1 U1 U1 un U1 U1 Ul U1 U1 u1 U7 Ul Ul Ul un U1 U1 r-I ri ri ri ri r-1 rl ri r-1 ra ri ri .-i r-I r-1 r♦ ri ri ri ri ri ri ri rl rl ri r-i

zzzzzzzzzzzzzzzzzzzzzzzzzzz

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ❑❑ A ❑ AG ❑❑ AAA ❑❑❑ OAA A ❑ A ❑❑❑ A ❑ A ❑

O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 000000000000000000000000 ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri r1

aaaaaaaaaaaaaaaaaaaaaaaaa aa 444444444444444444444444444 UUUUUUUUUUUUUUUUUUUUUUUUUUU

z zzaîzzzzzzzzzzzzzzzzzzzzzzzz

✓i r1 0 ri ri ri ri el ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri 0 o ri 0 0 0 0 0 . • . .

0 0 .

0 0 .

0 0 0 0 0 0 •

0 0 •

0 0 •

0 0 •

0 0 •

0 0 0 0 0 0 .

0 0 •

0 0 .

0 0 .

0 0 •

0 0 •

0 0 •

0 0 •

0 0 •

0 0 •

0 0 .

0 0 .

O 000000000000000 00 000000000

O O O O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl r1 ri C1 0 0 0 0 U1 N O N tP) 0 0 0 N O O O O O N ri Cl O N ri ri 0 CO N d' O C1 1D t` 1[) Ul ri 07 N O CO 10 co el O rl C1 C1 eP O er . . . . . . . . . • . . • . • .

OOOOr1 riNrlOON00 rirCriOrlriririr1000N0

er 1D V- Cl er er 4' 1D ri ri 1D 00 05 N C4 1D C) N N N CO ri Is 1p C4 t") ["'! ...........................

O ri O r` ri C1 d' r` Ill Onr Cl N O 00 N 1D er N U1 N VO Ul ri ri 01 Cl ririN ri ri C4 ri ri ri ri rlNri

rs N VI 00 N O nr Ill O M tD O O OD 00 r1 l, P1 Ul d' ri Ul N CO [, ri 00 1.0 CO CD Ul \D r- uD I• CD CD n r- t- r- r- r` 00 VD VD VD Cs ►D r` n ma

rsNUlOANOd'UlOC11DOO 0000riI-ClUId'ri111NCDC- 00 ma CO VD U) VD ls VD Cs VD [s CO [s Cs Cs n t- [- l- co uD VD vD l- YD n t- vD

V' Cl U1 co ri 01 ri O CT O O 00 CO d' Ul d' M O Cl VD N Ul 00 d' 00 VD eP Nt r+l er eP eP eP Ul Ul ep U1 U1 el eP er er nr Ul Ul Ul U1 1D )D eP r- C- C1 h N N N N N N N N N N N N N N N N N N N N N N N N N N N

ri N Cl Ul ri ri Ul Ul r Cl Ul eP ri 4) Cl CO 00 C1 1D O O O Ul t` CT er O O ri Cl C1 d' er er tl U1 1D 00 Ul Cs VD Cs O O 00 O ri ri ri ri d' V' O . . . . . . • . . • . . • • • . • . . • . • . . .

N N N N N N N N N N N N N N N N N N N f'1 Cl Cl 01 M C1 Cl eP n n n n r- r• r- C% h C- I- l- r- l- t- r- C- C- C- I- C- I- ‘DtDvDVD%DVD 4) vDvDvDVD 1/4D1DtDtD WVDVDID 14)‘D 4D MDVD4DV)%D ri ri ri ri ri ri ri ri ri ri ri ri ri ri ra ri ri ri ri ri ri ri ri ri ri ri ri

0 0 0 0 0 0 0 0 0 0 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ L L ❑ ❑ ❑ ❑ ❑

O Q O Cl O O O O 0 0 0 0 0 O O O O O 0 0 0 0 0 0 ri ri ri ri ri ri ri ri rl r) ri

0 a0 aaaaaa ÛÛ ÛÛÛ ÛÛÛüÛÛ

ri ri ri ri ri ri ri ri ri O 00000000 O 00000000

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 UlO0t%OOOON tDnt100000MMri

~ H

H

ta!

x O

C.)

c.7

~ H

~7

W z H

x 43

~]

H

O

E ~

O

là"1

O u

ST

RU

C F

LU

ID

Z Z Z Z Z Z Z Z Z ZZ H Z Z Z H Z Z Z Z Z Z

0 0 0 0 0 0 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ri ri ri ri ri ri ri ri ri

â â~ a~ââ~ Cl u u u u u u U U

ZEZZZZZZZ ZZZIZZZ[OZZZZZZ

ri ri O ri ri ri O ri ri ri ri ri ri 0OriO00ri000000 0 0 0 0 0 0 0 0 0 0 0 0 0

. .

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 O 0 0 0 0 0 OOriM00 ri00000N ONONNc'700NMNll1t-

. . . . • . . • . . • . • • . . • . . .

O N O O ri ri ri ri 0 Cl ri 0 0 ri ri O N ri ri M N O N

Ulririe':DUltD000 Ont VDClClriOe'MMI- VD nt .... • .. . ......... • .. .

M U1 M Ul U1 ri r- r, Ui U1 00 VD r•-• M 10 e' 03 ri Cl t% CO t% N Mri ri ririNriri 01 ri h4 ri

WW WW

W ÔÔ DÔ MD ri OQ C1 Cl o ri ri nt tx N N 00 M M ri Cl 1D 10 O ND-U1 Ul Ul 0\ ts1 N l% 00 V0 UI t0 i% 40 V) t% Û W W 0% 0%

0 0 ~~ 0 0 1 % U1 ~~~

w w

~~ Pl aa~ EA

1D ri 0) Cl Cl o ri ri e~ o~ :D43

:D ao M 4,,, ri C► VD tD O VD Ul U1 Ul Ch :D ~ n ao mo Ul vD t` V) tDt` aat`r-co0orr-oo aorinkarvo alx

O d' d' ri er ✓ OVD MM

M UI M Cl ri i- M 1D 00 e' • U1 • ri ▪ ri N OD e' U1 1D ri ND U1 VI 0% lD e' M e' W 10I-I-0ot-c0e'VD[%t%Coi-MMN 0)C1riCl0oM0o00ri 0000 Cl Cl Cl Cl N N N N ri 1D 43 VD Cl N N N N N cl Cl N M N N M 10 VD

ri ri ri ri ri

I I I I I ri ri VD N M co 00 d' CO O O r ri Cl 0 0 ri Q1 M CO l0 Q► ID Ul Cl d' t% O O ri 01 ~+d~ C~ U1 d' VD [~ UI 1D 00 CO O ri ri ri C7 iLl ~ CI CI O N N .. . . ... .. ., e'e'd'sr d'e`d'e'e'd'e'▪ ri• riri ri NNNNNNNNNM Mar t` r r- r- r r r t` r- r- r- co co co op co co ao ao co co 00 00 ao ao co 00 ND VD MD tD MD 4) 4) V3 VD VD LO ND W VD VD V) 43 VD VD VD VD tD VD VD VD VD ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri

a 44 0

o E H

CD a

Z H Û

H 44 a

E w

A Z 04

� ~ H

y U ❑

z gô O 4. c)

U ❑ H D

uls a 44

En 0

z 5 &ICI) D

H U W Cl)E

a g 5 w

14 44 43 Da

44 u) H .T,

DA Hâ w ~© C4 41 H

~ H PIC 01 w 3

0 W ❑ U W ~ Z ❑ E W ❑

41

~ ~~ ~ W N ~

I G4 ►~ 1-4 ai H

4 O ~3

DO ..w

43 N N x

a âa H WxÛ o >â El

4 w w

a gââ o Ul 0 U

0 ~ 44 Q

4

A w ww w Daa

44 IX 0 0

a E4 64 ❑

o x w U

~ â QH0

LV w 4 ❑

'I

zzzzzzzzzzzzzzzzzzzzzzzzzzz

O O N N N N N N th N N N N N N N N th N N N N U) CO N N DI A ❑ i-lf-lr-7F-11-1 ►-l 0r-lE -1r-1 ►4ar-7rZr-3r-l•-lv) chcn Ul) ci) ci) Ci)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri e i r i ri ri ri r i ri ri ri ri

aaaaaaaaaaaaaaaaaaaaaaaaaaa

~Ûûûû~û C~i û c~it4i û~v t

4i û~û c~iC~i Û c~i Ûûûûû

zzzzzZzzzzzzzzzzzzzzzzzzzzz

ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . • . • . • . • . • • • . . • • . • • • . • .

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O en O d' d' O d' O O O ri 1/40 VO C'f ri me O NO N el' O O 00 ri C` ri me O ri ri Ul CO ri ri ri N N Cl Ul ri N Ci ri O ri ri ri ri O ri N

. . • .

ri ri ri ri O ri O O e4 0 ri ri ri O O O O O O O O O O N ri O O

el Cl M d' r{ ri Cs r- Cl C1 r- Ul el kD r- co Cl N Ul Ul ri 00 CM ri O Ul • . • • • . • • . • • • . . •

Ch M sM d M Cl Cl O CO O CO ri CO 00 CO 42 ri ri 10 00 Cl N O Ul d' d' ri ri ri ri ri ri ri ri ri N ri ri ri ri ri ri CV

C1tl'(V0101Q1 M000Oi- Nr11000 1C ril"1r'10V000C1 cTrlUlTr ri tD 40 C• tD t0 uD r• n C` C` r- OD h C+ r r- re' Cs 42 U1 C` r- n VO Cs

Cl d' N Ch Cl Cl el 00 00 i` C4 el ti0 CO YD ri M ri C) VD O Cl Cr M Ul d' ri VD ND Cs 4D 10 VD C` r- r- r- C- CO C` r- nN r` C` 10 Ul C` C` N VD N

OO UI d'Ulc-riC-riUlc-c-d' C1NOUlil1 r110Ul t,rl C1MNNd' O 10 i` i• 1O MO Ul tO W ri U0 N\0 M CO N Cs Ul Ul VD VD Ul C► Cs V) i• V0 O CON CVNNNCJ Nri NriNfhNricV{VNNNriNNnlNN

UlNC100Ulcf1Cl M 10Nd'd'C VO r- ri N c-Ul ClrlCl NCId' d'ri d' CO CO CO O ri ri N CV O rl Ul el Ul VD OD h CO Cl O ri N d' eM Ul Ul Cs

.•......•..•..•.•.. •

~~v~ ininu,ululinit,u,in~ninul~r,u,in ~n 4D Vo VD ~ a Vc

00 0o e0 a0 00 03 CD OD CO CO OD CO Co 00 co m 00 CO CO 00 00 00 CO CO CO 0o co VD 4D VO tO VD VD VO V0 us 4) 4) w VD UD 1/40 +D w VO VD VD 4D 4D VD 4) VD ririririririririri riri ri ri ririri ri ri ri ri ri ri ri ri ri riri

z

o o

a a U S

TR

UC

FL

UID

~ o o o

o n ~ Q

~ ~

o ~

o ~

oz

C9 z H

H

D

N

04

O u

z H

1~7

43 z H

CD

W

m W H C4 o H

4

O

a a

47 C4 o u

z u

25

a

Crysta

lline-Limesto ne

Grain

s tone

~ g ~ ~ ~

~ y ~

y E rA

~ m ~ u ~ a Y

u CPI L J Z C1. 1/7 N N

Z

Shear Reverse

En-Ec helon

CO Û Û O G C7 ~ J z lb

Z a VI N Vi i sF

Y u Y

L aYe

aiY N

L ~ T g 4.,

L▪ L C t0 2 O TS i V L.7 O CL O

x J Y CC IV I—

<z ~ û o d â

MIN

ERAL TYPE

LIS

T O

F FR

AC

TU

RE

AB

BR

EV

IAT

ION

S

c J W

OOOOOONNInNN HCOONNCIO O O o 0 0 O 0 Ln 1f1 O l!1 t0 t` r-1 t` 0► CO C1 O O . . . • . . • . . . • • • . • •

000000OOr4HNd'Ull~d'd't0O O H CItOCOo10 O

ri ri

OOOOOONONN1n011- r-Ic1ON 1/4O O 0 0 0 0 0 0 In O Ln tn 0 0 d' ln N O ln to O . . . • • . . . . . . .• . I I •

0000000000 H N O N N in O H NNrIH O

H

1 H

R:1 GU (-I

E'4 H

g 0 CA 04

GH

w

PC

o pa

a

w x o U

W w O

5 2 El

U Z

w tâ 41 ô

OOOOOorIOHHNd'OCINCONN 0.1d'111C7N

Ln O Ln O Ln O Ln o ln O Ln O 1n O U1 O ln 0 H H N N C1 C) d' cr Ln tn to to 1- CO CO 01

I I i i I i l l l l l l l l l l l l

O LC) O In O 1.11 O ln O in O tn O U1 O to O Ln ri ri N N C1 C`1 d' d' L11 Ln to tO !• h CO CO

H 01 H

a E-4 O H

t9 z H El

z o U

et d' d' tD O O N C1 N 10 o N Ul ul 10 N O o CO CO CO CO M ul ul 01 Cl N 01 0 11) H ri N d' O 0

. . • • • . • . . • . . • . 0000r11'ln cr ulMN 01ONNe1' 010 O

d'erd'ct' 1'd'ln 1 /40rCOCOCO01 01 01 01 01 0 o

ri r-I

N O O O N d' C1 N N CO 01 1n N N O N r-I N O u) 0 0 0 1.11 ri 01 d' d' M ri 0 ul ln 0 W N ul O . . . • . . • . • . •

00000M001000d'riririONd'O .-I ri O

r♦

ri O O 0 rl 1 /40 ri CO 0 10 CO N M M O if l 01 r^I ri N ri N 01

ri

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 0 ri N M et Le/ 1 /40 N CO 01 O ri N M et ul 10 r-I N N N N N N N N N N M M M M M M M

I I 1 1 1 1 I I I I 1 1 1 I 1 I I 1

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0001Or-I NM 11 u1 1 /4D r0301Or-I NM1'ln H ri N N N N N N N N N N M M M M M

O N ln N et C1 ri N 01 ri M O N N N ri ri 0 X) 0 VI ri ri CO ul CO d' O 10 ri H N N M M

. • . • • • • I . • . . • O O ri ri M d' 13 ri C1 ri d' lf ) N r CO CO O O

rlriMM MM MMM~at

O N N N N ul N ri CO N N N N O ul N N O O 1n ul ul ln O 1 /40 N M tf 1 10 1n If ) O O ln ul O • . . • . • • • • • . . . • •

0 0 0 0 ri ri N d' CO r-i N ri ri O ri 0 ri 0 ri

O ri ri ri M N ln 01 1 /40 N ul M M O N r♦ M O +-I N

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 riNM d' 1n10 N CO Cri 0 rlNM d' 11110 N 00

ri ri ri ri ri ri r-I H +-♦

1 11111111111111111 4

000000000000000000 E+

ri N M d' ul 10 N CO C1 O r-i N M d' LC) 1 /40 N O

H r♦ ri ri rl ri ri ri El

t7 W

z O0N1Or103N0MI[1rONrlOr^IU10 O , z Ch h M d' O O N ul O lf1 0 lO rI N d' O ri O

H ~U 0~. • • • • • • • • • • • • • • .

1/4001 Nd'lf} COd•lnifl %O 1/4Dl~rnrin ,-~ o 0 r-INNf+} P1PT1nd' NI" cl' el' d'+er NI' lff W 000 O

a a

z

w t}a

ri ri

C C.)

O riN Tt. 1-U1tN CONNNNN0ti01rid'lfl O Oti CO 10 ri Ln O ri N lf1 lf1 1[1 ul in Q ri 1/40 ri CD O • • • • • • • • • • • • • • • • • •

01 k001f•lri 1iM 1/400O0OONd' 0")d' CO O ri ri ri r-1 O

r♦

CO C'l U1 1/40 C1 N N ri ri ri ri ri ce CO 1/40 I. 1/40 ri 01 ri ri NNC1 Ol

r-i

a A O ▪ W C.) W H

g a H

O V) u

0 0 0 0 O 0 0 0 0 0 0 0 0 O 0 0 0 0 • N M d' lf 1 k0 h CO 01 0 ri N M d' Ln 10 1- co

ri r♦ ri r♦ rl ri ri ri ri

1 I I I 1 1 1 1 t 1 i i t 1 t I 1 I ~

000000000000000000 H

r•I N fo/ d' 1f1 10 h CO O1 O ri N M d' lf1 10 h O ri H ri ra ri ri H ri H

C7 z H

CO

NT

AC

T

MO

RP

HO

LO

GY

H kAPz H

UUUU UUUUUUU U UUU UU VI tn U) u) mtncntnt,cncncntrlcn tncncn

aamaDm a0plaammmmmaamavaap0 cn aaa acn cncnarn ci) cn acnaatn

aaa aaa aaaaa aaz 3a0404 aaazaaaa CL. za AA

00 ri C1 N 00 10 N t, 11) O 10 C1 N d' N L~ CO ri ri ri ri ri ri ri ri ri ri 10 fl N M ri

z 0 N

m

CO ri C1 N a CO 10 N ts 111 O 40 C1 N d' N ts 00 ri rlariririririririril0t'1NC1 H

E-4 N N ri 10 0p N lll d' O['1 00 N C1 00 rI CO

ô~ ~ H rl 10 41 ri C1 C1 CI ri C1 CO t, 10 CI O1 O N e1 e1 %.0 ri ri N ri e-i ri

N o

Li1 d' +D Ok0 ri N M CO C1 CO N 111 40 ri CO N C1 ri 00 00 Cl i11 1r1 L11 10 CO C1 00 CO t0 O O ts C1

• ... . • ... • ... • .

Cl O O ri d' 00 N N N N N1 VI M ri 10 %D 10 %D CO C1 C1 01 ri ri ts rs r- t• nr- n co Op o0 CO 0) NP d' d' d' Ln 111 4) VD 10 1D 10 10 40 10 W w 10 10 ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri

ü

0 z H

N z 0 u

~ z H ac

ai z H ~ z

pa H

0

0

â

O u

cnuu Wotn

LIS

T O

F B

ED

DIN

G A

BB

RE

VIA

TIO

NS

a H

›+

z

124 o oa3

C7

x H

a

N

o

W

H x E-i W

~â a

V

OU1oD U1lf1 d'NNN NNO00000 a tCrld'M~*1Nrlr-l.-Ir-Ir10000 00

. . . . . . . • • . . . . • . .

Ohr110N NCD d' d'C'.0.10O0000 H d' N CO O CO Qti C1 C1 01 01 O O O O O O

ri e-1 r-1 H r-i ri

O 0 .

O O r-1

V

0111MC1000C0000000C000000 o OkOtnN00Oo0C0o000C0o0000 o . . • . . . • . .

O N M Ln to O if 1 111 O O O 9 t11 0 0 0 O 0 O r-+ NM o

r-4

OMer10r1O r-Iri0000r-1O000o ~ r-1

o

A

fkl w° tllotnolnomoulotnOLnoLnoulo QG Ei W r-IHNNM r+1 d'd'1111n10\ON.t•-•0000C1

o w~ ttttittittt i tttiii ~ C.) g oulolnoLnoLnou101notnoLnoln Ô

Q ~ r-I r-1 N N C7 M d' d' Ln to %0 :O l- [•-• co co F-+ U

H Ea Ei z

U

Ei x w U

n ttl tf1 If) Ul 111 ln tf1 C1 c" el M r1 0 0 0 O O O d'MC1MC1fhMN1NNNNNo0000 O

10NNN NNNNCOW COOOGDOOQOO o ✓ oaow0om0ocOCOCOCOOocOOOOOO-

~ ,{

oa000OO0000OOOO10OOOO o ocO00000OCO0000L0000 o o+n000000ln0000.-10000 0

r1 H

O r1 0 0 0 0 0 o r1 0 0 0 0 N 0 0 0 0 l~ ra

O O O O O O O O o 0 0 0 0 0 0 0 0 0 01 O r'1 N C l In 10 1-- CO 01 O r4 N ch d' to 10 e-I N N N N N N N N N N N1 r1 f+1 M N1 M l'1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 Co 01 o e-I N C7 Tr In 1/40 00 01 o rI N Mcr tn ri ri N N N N N N N N N N C•1 f'1 el C1 Cl M

W CO CO Co CO CO 10 1.11 rl d' N 01 I- l- (- I- o co co 0o co co I` 10 d' 01 m 1, d' d' d' d'

111 tn ul In Ili In H 1~ 01 N Ca 0 10 10 10 10 10 10 ri r1 N lf 1 In N NN N N N

w o 0 0 0 o CO Co 10 r1 CO 10 cO o 0 0 0 0 coOOOOooaoor-tncorcoOOOoo

Ln 0 o O o O in if) e-i C1 to rl to O o O O o e-1 N r-1

r-1 O O O O O ri r1 N d' rl N r♦ O O O O o

O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 rl N Cl d• ul 10 r CO al O ri N f'l d' If 1 10 i-- Co

ri ri ri r♦ rl H ri r4 ri

I 1 I I I I 1 I 1 1 I• 1 I I 1 I 1 I ►7

000000000000000000 E-i 1-1 N C'1 d' Co 01 o 1-1 N f•l KI, 111 10 1-- O

1.-4ri r•1 r-1 ri rl e-1 rl E

M ri 00 N N N N N ri C1 Ch C1 C1 Ch 1~ 1f 1 O O Ul d ri O 00 CO 00 CO 00 r% 1t1 Ln 1f1 111 tC1 .4* r1 O O . . . . . I . • . . . • . . . . • •

rl CM ri L~ CO 00 00 CO CO d' o O O O O N O O NN d'd'U1111t1)111 Ul tD r-n !` t` Cs 00O O

ri ri

H a Cl)+

Z CD 43

W H-1G9

~ Â~

x

W w

rI CO 00MD ooOO 03OD000O0003LUI Lc1 CO C` o0 1- O o O O 00 00 0 0 0 0 CO 00

. . . . •

rl Ul ri U1 ri O o 0 0 U1 U1 0 0 0 0 1C1 U) 1- N ri ri ri

O O

O O ri

d ri N ri N 0 0 0 0 ri ri O O O O ri ri r1 t` ri

P4 AG O É+ w

V fi X W H

0 uE ~ O) U

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r-INMsNU1tD L- 0001OriNN1d'Ul1p[~ CO

ri ri r1 ri ri ri ri ri ri

1

0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I

0 0 0 0 0 0 o a o 0 0 0 0 0 o a a riN M<rLnUD t-COC+ ~~rNir -ir~ir~ir~'ir i

~ EA

E°-+

d1 co) NCOl11hCOMO r-Ir-IlflrlMp1hM0001rICOC1 h h MC'f Nrlri r-lririHriNd'MMri Nri ri ri r♦10 U1

srMNCOU1hOMOr-lr-I111r-IMC1hMCDCIriCOMh i-N1i*1 N ri ri ri ri ri ri ri N d' M M ri N ri ri ri ri 10 U1

z o

_ a a]

drC1htl'MC1N10hhd'd'd'0001 1nN10100d' U1.7• er10h O 01 M M Q N h h 10 i11 OD 10 h rl N 10 10 nt d' N h 10 U1 Ci 00 lil 01 ri ri r-INf1NN N NN NriN N ri NN

41

C4

o

V W ~~x+* ~

D ;~

h N 00 C1 h M O N O CO h 10 O N ri d' M d' C1 10 M C1 ri ri N M d' Ul U1 h h C0 0 ri sr 10 CO N i' CO N N . . . . • • • • • . . • . . . . . . . • •

U1 10 1D 10 10 10 10 10 10 10 10 h h h h h CD C1 C1 O ri CO CO a0 CO m 00 CO m CO 02 CO 00 0D CO CD Co 00 W CO C1 C1 ~a rr at nt sr Nt a gr a gr gr •r nr nr nP tr nr nt ri ri rl ri ri ri ri H ri ri ri ri ri ri ri ri ri ri ri ri ri 1

491.9

2

!f 1 It CO 0 CO ri lfl d' d' r-1 O Ch Ch Ch o N 01 d' On d' ri h m0 N co co 111 d'Clh CO ri ri 04 ri ri Cg 0401NN Trf'1mDhhUI N

U1 d'COIf100riiL'Id'TtrioC1C1C10NOhd'C1T!*i!~ 0N00O0 d' i'lh 03 ri ri 04 ri riNNMNNTtM1DhhU1N

Cl)

H ;4 p

H 4 a o m mg a

rk4 a 0 V

• • w

ri

C H

Pl Z r1H

~

ac

44

Fai âi

A N W 4A

t1~ X 04 Ei W W Z

E+

OOClCOd'NriCOOU7hhClU7rihCOCld'd'VDhUlClOri C1 hd'COVC od'Cld'c1Uld'UlTtsrOlCClUIriCOCILl1 Ulri f`lh ri ri N ri ri c7 ri Cg N N ri ri ri ri ri N ri ri N ri ri ri ri cl c'1 ri

tD10c'lUlOtCtO t"l COOstriMoMrlCl Plh VD 00O1id'CDC1Ch Cl C1hU1Nd'~OCOCOCOri Oo rilp COO NriUlUINMUId'hc'"1

. ... .... ... ..... ...... • •• • • h h i- h h h h CO CO CO CO CO CO Ch Cl Ch Cl O ri cl 01 c7 ri N

ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri N N h h i- CO CO Ul Ul icl Ul Ul Ul U7 4i ul Ul U7 Ul Ul Ul Ul Ul Ul Ul U1 Ul Ul l[1 t0 MD %O VD MD ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri

COtDYDCV ad'd'CDri st C, lOt-1,d',-lN Cl

CO VO VD CV d' d' st O ri ▪ r`VDnr`nrriCg M

cl' CV CV r) d1 O1 OD VO N

4, tD U1 d' r• Cl r` t0

ri rI M ri CV

Na C1G cri O xw U w w

0Z

C1U1tDU1U1C©CDCV ▪ r,I- CTCTCJVOCV Q1

• • . • • • • .•

CVCVCg N CVChd'VDtO OOCOCOOOODCOtlOCOCO 10VD10VD MD V010t0 ~0 ri r1 ri ri ri r1 r-I ri ri

a Ch st C1 t0 0C% 03 M r- r- co ri Ut C1 6► O O

00 ri C1 r1 O C1 C1 11l O N 00 00 d' t, in el rl O O . . . . • . • . • . . • .

• d' e-ICOOONONC1Nrlrl Ill 00r100000 O

N d' d' U1 VD Ps. Ps P+ 00 CO CO CO 00 C1 C1 Cl O O ri ri

w

Z H

a

W

W Z H [9

~

I

N 14

C4

Fi

O E OC a o CC

Wtn 0 4

za âH w âw ÂH~

tllW 41 E-i W N â aaa â

~ p7 7 ~ Û ›. tH!!~W

H

O ~W zââ 0Pr40 H H W

m ri El H

HâH

H 4 G1 EI

z W

ÇA â

44 W

I-i ►-1 >+ E to

er in st Ul Co er 0 ri Ul rl ri o r1 rl er er o ri

CO ci T` d' 00 0 10 Io N VO ONO N 00 CO O 10 . . • • • • • • . . • • • . . . . .

d'Cl1- 0C1erO0riVOrlriOrlMni. d'Orl r♦ r'a

C1NrivTtDr1l11r1d'NriOr'iNMr'?Ori ri ri

O O

O 0 1-4

N 10

4 a

W

as

O C.)

A

É w

r

U1 O In O Ul O U1 O U1 O U1 O Ul O Ul 0 Ul O ririNNrlrld' V'UlUl00 r-t- 0000C1

1 I I 1 1 1 1 I 1 1 1 1 I i 1 I 1 i

O U1 O Ul O ul O Ul O U'f O U1 O Ul O Ul O Ul ririNNrlrinrerUlU1V01Dt-r- 0000

00

O E

04 o v

d' 00 00 Cl N r1 1- ri t0 ri ri N d' 41 Cl C\ 0 0 0 CO t0 40 N 41 ri C1 00 C4 r cl C1 tn cl el 0 0 0

• . • . . . . . • . . d' Cl C1 ri d' mD O ul N 00 CO o ri M 00 CO O O o

U) u1 ul t0 t0 VD r- r co 0 Co Cl Cl Cl Ch C1 O o o

ri ri ri

M d' O ri M rl d' d' If 1 1f 1 O ri ri ri Ir O ri O O N 000tON 1/400000 V'd'OtOtOtD0o0t00 O ••• . . . . . . . . .

01 V'Or~iMrkd'mrtDtDO riririd'OriO O 0 rl

N MO +-I NrlClc"► d'mrOriririNlOrlO N t0

D O O O O O O O O O O O O O O O O O Cl D ri N M d' u1 1/40 1` 00 Cl O ri N r1 ef' In t0 ri N N N N N N N N N N r1 el cl M r1 Cl r1

111111111111111111

O D O O O O O O Q O O O O O D O 0 0 OD C► O ri N el mr ul t0 i+ O Cl O ri N r1 d' Ifl ✓i ri N N N N N N N N N N el el r1 C'1 el r1

H Pl cl t0 00 00 r, d' r+ l` Cl ri ri N(- ul o ri 10 N N O 40 tD ri P Ch C1 ri 00 00 d' CO u1 O42 4•••• . . . •.' . . . . .

ri r1 M CO C1 C1 t0 [` O O C ul ul (` rl cl O ri ri ri N N N N N N r1 d' 41 41

ri ri O d' ri O u1 ri C1 O cl 1-1 O ri t11 CO ul ri t0t0OOt0od'tDNofV tOo tDeM a

ri ri o.r ri o W ri rl o rl ri o ri UP Cl up ri

ri ri O cl ri CD gr ri N O N• ri D ri C tD gr ri

O O O O O O O O O O O O O O O o D 0 ri N cl sr u1 tD op Ch O ri N cl d' 111 t0 r% CO

ri ri ri ri ri ri ri ri ri

O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 D 0 E

riNcl V'u1t0t+ 00C1O riNc`lsf'Intp r- O

ri ri ri ri ri ri ri ri [--1

InCOONd'Mr-1h01MCOCOMNONNO O d't0O11f1NONNMN1010ri01lnCOMO O . . • . . . . . • . . . . . • . . . .

tO01Nd'1-01C01000Mo01100NMOO O r! ►-i .-i N M d' d' 1l1 1f1 LL1 10 N h 00 C1 OO

IAMMrIM0ti0010rid'1f1O41d'r101U1C0 O d' N N 10 N N 10 O 10 CO d' O d' CO 10 N d' .O O . . . . . . . . . . • . . . . . . . .

1O M M rl M HO CO rl d' 10 O t0 d' rl ri 01 O ri ri O

rl

e11 NNriNNlOUlrlMd'Od'Mr-i [~eYtO N 10

ac ca 000000000000000000 ri N M d' If'1 W N CO O O ri N M e1' if 1 10 N 0O

° HW r1 rl r-1 r-i r-1 ri ri ri r♦ V

aWH

aEa~+ I I I i 1 1 1 1 1 1 I l I l 1 1 1 1

000000000000000000 ~

OV1 riNMd'U110NCOC1O riNMd'1n10r- O V ri r-I H H ri ri ri H [-4

CORE LABORATORIES

COMPANY WELL LOCATION

: : :

CORE DESCRIPTION File #52135 92-0132 File #52131 92-0146

SOQUIP (INTRAGAZ) SOQUIP ST. FLAVIEN NO. 8

FIELD ST. FLAVIEN INTERVAL : Core #1 - 1189.00 - 1192.25 m

Core #2 - 1192.25 - 1194.65 m Core #3 - 1454.00 - 1457.50 m Core #4 - 1457.50 - 1463.05 m Core #5 - 1485.95 - 1496.50 m Core #6 - 1514.00 - 1524.25 m Core #7 1524.50 - 1533.85 m Core #8 - 1535.00 - 1540.00 m Core #9 - 1672.00 - 1674.70 m Core #10 - 1674.70 - 1687.00 m

1189.00 - 1194.43 m

Shale 100%: Dark grey to black , blocky to fissile, calcareous shale. Common disseminated pyrite is present. Rare to common calcite filled fractures are noted. Lost core occurs from 1191.00 - 1192.25 meters.

1194.45 - 1194.65 m

Lost Core

1194.65 - 1454.00 m

Drilled Interval

1454.00 - 1455.65 m

Limestone 100%: Brown, very finely crystalline limestone (mudstone). The unit has a mottled texture and contains occasional stylolites. The unit is slightly argillaceous at the interval top. Local calcite filled fractures. Gradational contact at the interval base. The unit is tight.

1455.65 - 1457.00 m

Dolomite 100%: Grey to brown, medium crystalline, locally argillaceous dolomite. Rare stylolites are noted. The unit exhibits a thinly laminated and local bioturbated texture. Local disseminated pyrite is detected. Rare to common calcite filled fractures are noted. No visual porosity is present.

~

CORE LABORATORIES

CORE DESCRIPTION (continued)

145740 - 1457.50 nt

Lost Core

1457.50 - 1458.98 m

Limestone 100%: As above (1454.00 - 1455.65 meters).

1458.98 - 1401.12 m

Dolomite 100%: Grey to brown, medium crystalline, calcareous dolomite. The unit has a massive texture. Rare stylolites are noted. Some areas appear to be argillaceous. Local calcite filled and partially open fractures are present. Gradational contact at the interval base. Local poor intercrystalline porosity and poor permeability.

1461,12 - 1461.51 m

Shale 100%: Dark grey to black, silty and calcareous shale. The unit has a bioturbated texture, however the individual burrow traces are undifferentiated. Common disseminated pyrite is present. Sharp contact at the interval base.

1461.51 - 1463.05 m

Dolomite 100%: Brown, medium crystalline dolomite. The unit has a planar laminated to slightly mottled texture. Local calcite filled fractures are identified. Poor intercrystalline porosity and poor permeability is established from the core analysis data.

1463.05 - 1485.95 m

Drilled Interval

1485.95 - 1487.21 m

Limestone 100%: Brown, very finely crystalline limestone (mudstone). Occasional stylolites are noted. The unit exhibits a burrow ? mottled texture. Local calcareous filled fractures are present. Sharp contact at the interval base. The interval is tight.

1487.21 - 1491.92 m

Dolomite 100%: Brown, medium crystalline, calcareous dolomite. The unit exhibits a planar laminated to slightly mottled (burrowed?) texture. Local calcite filled fractures are present. Sharp contact at the interval base. The unit has poor intercrystalline porosity and poor permeability.

CORE LABORATORIES

CORE DESCRIPTION icoQtinued)

1491.92 - 10S.29 in

Limestone 100%: Brown, very finely crystalline dolomitic limestone (mudstone). The unit is thinly bedded and contains occasional stylolites. A shale break, 2cm. thick, occurs at the interval top. Local calcite filled fractures are present. A representative thin section from sample 13 indicates 60% calcite and 40% dolomite. Gradational contact at the interval base. Overall, the unit has poor intercrystalline porosity and poor permeability.

1495s 29 - 1496.05 ni

Limestone 50%/Shale 50%: Brown, very finely crystalline limestone (mudstone) interbedded with dark grey, calcareous shale. The unit exhibits a mottled texture and becomes increasingly shaly towards the interval base. Rare calcite filled fractures are detected. The unit is tight.

1496.05 - 1496.50 In

Lost Core

1496.50 - 1514.00 m

Drilled Interval

1514.00 - 1516.70 m

Dolomite 100%: Brown, medium crystalline, calcareous dolomite. A thinly laminated to slightly mottled texture is observed. A high amplitude stylolite is noted at 1550.60 meters. The stylolite may represent an unconformity surface. Local calcareous filled fractures are present. The fractures have displaced the thinly laminated texture. Sharp contact at the interval base. The interval has poor intercrystalline porosity and poor permeability.

1516.70 - 1517.41 m

Shale 100%: Green to grey, calcareous shale. The unit exhibits a laminated to mottled texture. Local calcite filled fractures are present. Sharp contact at the interval base.

1517.41 - 1518.79 m

Limestone 100%: Brown, very finely crystalline limestone (mudstone). Laminated to thinly bedded texture with argillaceous laminations occurring along the bedding plane. No fractures were detected in this interval. Gradational contact at the interval base. The interval is tight.

CORE LABORATORIES

CORE DESCRIP TON (hued)

1518.79 - 1522.38 œ

Limestone 100%: Brown to grey, very finely crystalline, dolomitic limestone (mudstone). The unit exhibits a burrow ? mottled texture. Local calcite vertical fractures are identified. Abundant disseminated pyrite is observed from 1520.82 - 1521.30 meters. Gradational contact at the interval base. Local poor intercrystalline porosity and poor permeability is present.

1522.38 - 1524.25 m

Dolomite 100%: Brown, medium crystalline, calcareous dolomite. The unit exhibits a mottled texture. Occasional undifferentiated fossils occur locally. Occasional calcite filled vertical fractures present. Minor disseminated pyrite is detected. The interval has poor intercrystalline porosity and poor permeability.

1524.2$ - 1524.50 m

Drilled Interval

1524.50 - 1532.34 m

Dolomite 100%: Brown to grey, medium crystalline, locally slightly calcareous dolomite containing local (1526.22 - 1528.88 meters) pinpoint vugs. The unit has a mottled texture. Local calcite and rare partially opened fractures are present. Locally, disseminated pyrite is detected. The unit is increasingly calcareous from 1529.65 - 1530.91 meters. Trace bitumen is detected within occasional pinpoint vugs. The thin section from sample 26 indicates significant dolomite (98%) with minor calcite (1%) and bitumen (1%). Sharp contact at the interval base. Overall, the unit has poor intercrystalline and local pinpoint porosity and poor permeability.

1532.34 - 1533.02 m

Dolomite 100%: Grey, finely crystalline, argillaceous and calcareous dolomite. The unit exhibits a mottled texture. Rare stylolites are noted. Local calcite filled vertical fractures are identified. Some disseminated pyrite is associated with the argillaceous material. Sharp contact at the interval base. The interval is tight.

1533.02 - 1533.50 m

Dolomite 100%: As above (1524.50 - 153234 m).

1533.50 - 1533.85 m

Lost Core

CORE LABORATORIES

CORE DESCRIPTION (continued)

1533,85 - 1535.00 m

Drilled Interval

1535.00 - 15x8.45 m

Shale 70%/Limestone 30%: Dark grey, calcareous shale interbedded with light grey argillaceous limestone. Overall, the unit has a mottled (bioturbated?) texture. Rare calcite filled fractures are identified. The unit becomes increasingly calcareous towards the interval base. Local disseminated pyrite is present. Gradational contact with the underlying interval. The interval is tight.

1538.45 - 1539.05 m

Limestone 100%: Brown, very finely crystalline dolomitic limestone (mudstone). The unit has a mottled texture. Local calcite filled fractures are present. Minor disseminated pyrite is identified. Gradational contact at the interval base. The interval is tight.

1539.05 - 1540.00 rtt

Shale 50%/Limestone 50%: As above (1535.00 - 1538.45 meters).

1540.00 - 1672.00 m

Drilled Interval

167 ,00 - 1674.60 m

Dolomite 100%: Grey, very finely crystalline, calcareous dolomite. The unit exhibits a thinly laminated texture with a mottled texture observed at the interval base. Local calcite filled fractures are present. Locally, argillaceous material is present along the bedding plane. The interval is tight.

1674.60 - 1674.70 m

Lost Core

1674.70 - 1676.04 m

Sandstone 75%/Shale 25%: Grey, fine grained, moderately sorted, well lithified sandstone interbedded with black calcareous shale. The unit is heavily bioturbated, however no individual burrow traces could be differentiated. A cross bedded, medium grained sandstone bed, 12cm. thick, occurs at 1675.04 meters. The thin section from this sandstone bed identifies quartz (90%), feldspar (1%), dolomite (5%), authigenic quartz (3%), detrital

CORE LABORATORIES

CORE DESCRIPTION (continued)

clay (1%) and trace amounts of calcite and pyrite. Rare calcite filled fractures are present. Gradational contact at the interval base. No visual porosity was detected.

1676.04 - 1677.06 m

Shale 60%/Sandstone 40%: Grey to black, calcareous shale interbedded with grey, very fine to fine grained, poorly sorted, well lithified sandstone. The unit is heavily bioturbated. Local disseminated pyrite is identified. No fractures are present. Sharp contact at the interval base. The interval is tight.

1677.06 - 1677.71 m

Sandstone 75%/Shale 25%: As above (1674.70 - 1676.04 meters).

1677.71 - 1681.64 m

Dolomite 100%: Grey to brown, medium crystalline, slightly calcareous, arenaceous dolomite. The unit has a mottled (bioturbated?) texture. Local calcite filled vertical fractures and disseminated pyrite is present. Argillaceous laminations are noted at 1679.30 meters. The unit has a brecciated texture from 1680.34 - 1681.64 meters. The brecciated nature and sharp erosional contact possibly indicates an unconformity at the interval base. Overall, the unit is tight.

1681.64 - 1684.$$ m

Dolomite 100%: Brown, medium crystalline, calcareous dolomite. The unit has a mottled texture and is locally arenaceous. Rare stylolites and calcite filled fractures are present. Sharp contact at the interval base. The interval is tight.

1684.88 - 1686.05 m

Shale 100%: Dark grey, silty and arenaceous, calcareous and dolomitic shale. The unit exhibits a bioturbated texture and contains occasional burrows. The trace fossil is tentatively identified as Teichichnus which is commonly associated with lower shoreface marine settings. Minor disseminated pyrite is present. Sharp contact at the interval base.

1686.05 - 1687.00 m

Sandstone 100%: Grey, fine grained, moderately sorted, well lithified, argillaceous sandstone. The unit exhibits a cross bedded texture, however the bedding planes are locally disrupted by brecciation. Cemented with calcite and dolomite. Local calcite filled fractures are present. The interval is tight.

CORE LABORATORIES

COMPANY WELL LOCATION

:

:

CORE DESCRIPTION File #52135 92-0132

• SOQUIP

File #52131 92-0146

SOQUIP (INTRAGAZ) ST. FLAVIEN NO. 8

FIELD : ST. FLAVIEN INTERVAL : Core #1 - 1189.00 - 1192.25 m

Core #2 1192.25 - 1194.65 m Core #3 - 1454.00 - 1457.50 m Core #4 1457.50 - 1463.05 m Core #5 1485.95 - 1496.50 m Core #6 - 1514.00 - 1524.25 m Core #7 - 1524.50 - 1533.85 m Core #8 - 1535.00 - 1540.00 m Core #9 - 1672.00 - 1674.70 m Core #10 - 1674.70 - 1687.00 m

j189.00 - 1194.45 m

Shale 100%: Dark grey to black , blocky to fissile, calcareous shale. Common disseminated pyrite is present. Rare to common calcite filled fractures are noted. Lost core occurs from 1191.00 - 1192.25 meters.

1194.45 - 1194.65 m

Lost Core

1194.65 - 1454.00 m

Drilled Interval

1454.00 - 1453.65 m

Limestone 100%: Brown, very finely crystalline limestone (mudstone). The unit has a mottled texture and contains occasional stylolites. The unit is slightly argillaceous at the interval top. Local calcite filled fractures. Gradational contact at the interval base. The unit is tight.

1455:63 - 1457.00 nt

Dolomite 100%: Grey to brown, medium crystalline, locally argillaceous dolomite. Rare stylolites are noted. The unit exhibits a thinly laminated and local bioturbated texture. Local disseminated pyrite is detected. Rare to common calcite filled fractures are noted. No visual porosity is present.

CORE LABORATORIES

CORE DESCRIPTION (continued)

1457.00 - 1457.50 m

Lost Core

1457.50 - 1458,98 m

Limestone 100%: As above (1454.00 - 1455.65 meters).

1458.9k- 1461.12 m

Dolomite 100%; Grey to brown, medium crystalline, calcareous dolomite. The unit has a massive texture. Rare stylolites are noted. Some areas appear to be argillaceous. Local calcite filled and partially open fractures are present. Gradational contact at the interval base. Local poor intercrystalline porosity and poor permeability.

1461.12 - 1461.51 m

Shale 100%: Dark grey to black, silty and calcareous shale. The unit has a bioturbated texture, however the individual burrow traces are undifferentiated. Common disseminated pyrite is present. Sharp contact at the interval base.

1461.51 - 1463.05 m

Dolomite 100%: Brown, medium crystalline dolomite. The unit has a planar laminated to slightly mottled texture. Local calcite filled fractures are identified. Poor intercrystalline porosity and poor permeability is established from the core analysis data.

1463.05 - 1485.95 m

Drilled Interval

1485.95 - 1487.21 m

Limestone 100%: Brown, very finely crystalline limestone (mudstone). Occasional stylolites are noted. The unit exhibits a burrow ? mottled texture. Local calcareous filled fractures are present. Sharp contact at the interval base. The interval is tight.

1487.21 - 1491.92 m

Dolomite 100%: Brown, medium crystalline, calcareous dolomite. The unit exhibits a planar laminated to slightly mottled (burrowed?) texture. Local calcite filled fractures are present. Sharp contact at the interval base. The unit has poor intercrystalline porosity and 7oor permeability.

CORE LABORATORIES

CORE DESCRIPTION (continuedI

1491.92 - 1495.29 m

Limestone 100%: Brown, very finely crystalline dolomitic limestone (mudstone). The unit is thinly bedded and contains occasional stylolites. A shale break, 2cm. thick, occurs at the interval top. Local calcite filled fractures are present. A representative thin section from sample 13 indicates 60% calcite and 40% dolomite. Gradational contact at the interval base. Overall, the unit has poor intercrystalline porosity and poor permeability.

1495.29 - 1496.05 m

Limestone 50%/Shale 50%: Brown, very finely crystalline limestone (mudstone) interbedded with dark grey, calcareous shale. The unit exhibits a mottled texture and becomes increasingly shaly towards the interval base. Rare calcite filled fractures are detected. The unit is tight.

1496.05 - 1496.50 m

Lost Core

1496.50 - 1514.00 m

Drilled Interval

1514.00 - 1516.70 m

Dolomite 100%: Brown, medium crystalline, calcareous dolomite. A thinly laminated to slightly mottled texture is observed. A high amplitude stylolite is noted at 1550.60 meters. The stylolite may represent an unconformity surface. Local calcareous filled fractures are present. The fractures have displaced the thinly laminated texture. Sharp contact at the interval base. The interval has poor intercrystalline porosity and poor permeability.

1516.70 - 1517.41 m

Shale 100%: Green to grey, calcareous shale. The unit exhibits a laminated to mottled texture. Local calcite filled fractures are present. Sharp contact at the interval base.

1517.41 - 1518.79 m

Limestone 100%: Brown, very finely crystalline limestone (mudstone). Laminated to thinly bedded texture with argillaceous laminations occurring along the bedding plane. No fractures were detected in this interval. Gradational contact at the interval base. The interval is tight.

CORE LABORATORIES

CORE DESCRIPTION (continued)

1518.79 - 1522.38 m

Limestone 100%: Brown to grey, very finely crystalline, dolomitic limestone (mudstone). The unit exhibits a burrow ? mottled texture. Local calcite vertical fractures are identified. Abundant disseminated pyrite is observed from 1520.82 - 1521.30 meters. Gradational contact at the interval base. Local poor intercrystalline porosity and poor permeability is present.

1522.38 - 1524.25 m

Dolomite 100%: Brown, medium crystalline, calcareous dolomite. The unit exhibits a mottled texture. Occasional undifferentiated fossils occur locally. Occasional calcite filled vertical fractures present. Minor disseminated pyrite is detected. The interval has poor intercrystalline porosity and poor permeability.

1524.25 - 1524.50 m

Drilled Interval

1524.50 - 1532.34 m

Dolomite 100%: Brown to grey, medium crystalline, locally slightly calcareous dolomite containing local (1526.22 - 1528.88 meters) pinpoint vugs. The unit has a mottled texture. Local calcite and rare partially opened fractures are present. Locally, disseminated pyrite is detected. The unit is increasingly calcareous from 1529.65 - 1530.91 meters. Trace bitumen is detected within occasional pinpoint vugs. The thin section from sample 26 indicates significant dolomite (98%) with minor calcite (1%) and bitumen (1%). Sharp contact at the interval base. Overall, the unit has poor intercrystalline and local pinpoint porosity and poor permeability.

1532.34 - 1533.02 m

Dolomite 100%: Grey, finely crystalline, argillaceous and calcareous dolomite. The unit exhibits a mottled texture. Rare stylolites are noted. Local calcite filled vertical fractures are identified. Some disseminated pyrite is associated with the argillaceous material. Sharp contact at the interval base. The interval is tight.

1533.02 - 1533.50 m

Dolomite 100%: As above (1524.50 - 1532.34 m).

1533.50 - 153345 m

Lost Core

GORE LABORATORIES

CORE DESCRIPTION (continued)

153.485 - 1535.00 m

Drilled Interval

1535.00 - 1538.45 m

Shale 70%/Limestone 30%: Dark grey, calcareous shale interbedded with light grey argillaceous limestone. Overall, the unit has a mottled (bioturbated?) texture. Rare calcite filled fractures are identified. The unit becomes increasingly calcareous towards the interval base. Local disseminated pyrite is present. Gradational contact with the underlying interval. The interval is tight.

1538.45 - 1539.05 m

Limestone 100%: Brown, very finely crystalline dolomitic limestone (mudstone). The unit has a mottled texture. Local calcite filled fractures are present. Minor disseminated pyrite is identified. Gradational contact at the interval base. The interval is tight.

1539.05 - 1540.00 m

Shale 50%/Limestone 50%: As above (1535.00 - 1538.45 meters).

1540.00 - 1672.00 m

Drilled Interval

1672.00 - 1674.60 m

Dolomite 100%: Grey, very finely crystalline, calcareous dolomite. The unit exhibits a thinly laminated texture with a mottled texture observed at the interval base. Local calcite filled fractures are present. Locally, argillaceous material is present along the bedding plane. The interval is tight.

1674.60 - 1674.70 and

Lost Core

1674.70 - 1676.Q4 m

Sandstone 75%/Shale 25%: Grey, fine grained, moderately sorted, well lithified sandstone interbedded with black calcareous shale. The unit is heavily bioturbated, however no individual burrow traces could be differentiated. A cross bedded, medium grained sandstone bed, 12cm. thick, occurs at 1675.04 meters. The thin section from this sandstone bed identifies quartz (90%), feldspar (1%), dolomite (5%), authigenic quartz (3%), detrital

CORE LABORATORIES

CORE DESCRIPTION (continued)

clay (1%) and trace amounts of calcite and pyrite. Rare calcite filled fractures are present. Gradational contact at the interval base. No visual porosity was detected.

1676.04 - 1677.06 m

Shale 60%/Sandstone 40%: Grey to black, calcareous shale interbedded with grey, very fine to fine grained, poorly sorted, well lithified sandstone. The unit is heavily bioturbated. Local disseminated pyrite is identified. No fractures are present. Sharp contact at the interval base. The interval is tight.

1677.06 - 1677.71 m

Sandstone 75%/Shale 25%: As above (1674.70 - 1676.04 meters).

1677.71-1681.64m

Dolomite 100%: Grey to brown, medium crystalline, slightly calcareous, arenaceous dolomite. The unit has a mottled (bioturbated?) texture. Local calcite filled vertical fractures and disseminated pyrite is present. Argiliaceous laminations are noted at 1679.30 meters. The unit has a brecciated texture from 1680.34 - 1681.64 meters. The brecciated nature and sharp erosional contact possibly indicates an unconformity at the interval base. Overall, the unit is tight.

1681.64 - 1684.88 m

Dolomite 100%: Brown, medium crystalline, calcareous dolomite. The unit has a mottled texture and is locally arenaceous. Rare stylolites and calcite filled fractures are present. Sharp contact at the interval base. The interval is tight.

1684.88 - 1686.05 m

Shale 100%: Dark grey, silty and arenaceous, calcareous and dolomitic shale. The unit exhibits a bioturbated texture and contains occasional burrows. The trace fossil is tentatively identified as Teichichnus which is commonly associated with lower shoreface marine settings. Minor disseminated pyrite is present. Sharp contact at the interval base.

1686.05 - 1687.00 ~

Sandstone 100%: Grey, fine grained, moderately sorted, well lithified, argillaceous sandstone. The unit exhibits a cross bedded texture, however the bedding planes are locally disrupted by brecciation. Cemented with calcite and dolomite. Local calcite filled fractures are present. The interval is tight.

DESCRIPTIVE

Q J u-

v Y

L

a

0

7 Ot

CD o

â

Q Q Q

L ~ G1 r- ra W (N 0 Y (0 L

0 U r m

N

E L 47 a

X LU • ô Ô

413 >

û ~ +o. L (0 m C [] In N

o pré-archivage

z Q

Grande-catégo

rie

Sous-ca

tég o

rie

Q

~

-a .

-8 N

L

Rapp ort de fin

Basses-Terres, sédiments conso

lidés

~

Q

akIPIPOIR 1~ D°IMPIA.NTATIION

SOCO UL?IIIP 1E7 AL ST-TbAVIEN NO 8

ADRESSÉ AU : MINISTÈRE DE L'ÉNERGIE ET DES RESSOURCES DIRECTION DE L'AMÉNAGEMENT GROUPE EXPLORATION

SOQUIP # 14268 - Henri Lizotte Directeur Exploration

NOVEMBRE 1991

sou ui:

TABLE DES MATIÈRES

1- INTRODUCTION 1

2- RÉTROSPECTIVE (structure de St Flavien) 2

3- LOCALISATION DU ST-FLAVIEN NO 8 3

4- GÉOLOGIE ET GÉOPHYSIQUE

4.1 Géologie de la région de St-Flavien 4

4.1.1 Prévisions géologiques (St-Flavien No 8) 5

4.1.2 Objectifs du forage 6

4.2 Sismique de la région de St-Flavien 6

4.2.1 Corrélation géologique - géophysique 7

4.2.2 Emplacement géophysique du forage 7

5- PROGRAMME DU FORAGE 9

6- PROGRAMME D'ÉVALUATION 10

7- CONCLUSION 11

LISTE DES FIGURES ET ANNEXES

FIGURES DESCRIPTION

Localisation du St-Flavien #8 : IA) - Sur carte cadastrale 1:20 000 1B) - Sur carte topographique 1:50 000 1C) - Sur le site du St-Flavien No 3

Coupe structurale des Basses-Terres du St-Laurent

Contrôle sismique (région St-Flavien)

Profil sismique 5Q-29

Sonigramme de St-Flavien #3

Interprétation géologique du 5Q-29

Coupe géologique (schématique) du réservoir

ANNEXES DESCRIPTION

Curriculum vitae de Randy Hawkings

Description de la foreuse No 1 de RALEX

Chronologie des opérations de forage

Prévision de la courbe du forage

Description du Geologger de Datalog

Programme de boue de forage

Demande de permis de forage de puits

2

3

4

5

6

7

A

B

C

D

E

F

G

1- INTRODUCTION

Dans le cadre du forage du puits SOQUIP et al St-Flavien No 8 et conformément au règlement sur le pétrole, le gaz naturel, la saumure et les réservoirs souterrains (octobre 1988), SOQUIP soumet le présent rapport d'implantation. Plus particulièrement, ce rapport répond aux exigences du ministère de l'Énergie et des Ressources telles que rédigées au chapitre III, section 1 dudit règlement.

Le forage du St-Flavien #8 représente la première étape du projet de la conversion du gisement gazier de St-Flavien en réservoir souterrain.

Afin de bien gérer ce réservoir, compte tenu de la condition actuelle du marché, il a été estimé que 10 puits additionnels, ayant des caractéristiques similaires au puits St Flavien #3, seront nécessaires.

La mise en opération du réservoir souterrain de la "structure" de St-Flavien implique une infrastructure relativement complexe, ainsi que d'importants déboursés. Ce nouveau puits (St-Flavien #8) aura donc pour objectif de fixer les paramètres du développement de la structure et de statuer, de façon définitive, sur la faisabilité du projet.

2

2- RÉTROSPECTIVE (Structure de Sfi Flavienl

Au début des années 60, la compagnie Shell entreprend un vaste programme d'exploration pétrolière dans les Basses-Terres du Saint-Laurent. Un audacieux programme d'acquisition sismique réflexion, via la technique Vibroseis, est entrepris sur l'ensemble du réseau routier des Basses-Terres.

Cet effort conduit à l'identification de plusieurs anomalies structurales dont celle de St Flavien (1969).

La suite des événements est comme suit :

1972-73 : Shell procède au forage du puits St-Flavien #1, où de bons indices de gaz sont rapportés.

1973-74 : Entente d'amodiation entre Shell et SOQUIP sur l'ensemble des Basses-Terres. La région de St-Flavien fait partie de l'entente.

1975 : SOQUIP ré-évalue le puits de St-Flavien #1, parachève le puits et fait une découverte significative de gaz.

1975-76 : SOQUIP fore le puits St-Flavien #2 (bons indices) et St-Flavien #3 (découverte de gaz).

1976-78 : Les puits St-Flavien #4, #5 et #6 sont implantés et s'avèrent tous secs.

1979-80 : Construction d'un poste de compression au site de St-Flavien #3 et début de la production du gaz via la technique du gaz porté (GNC).

1983-84 : Construction d'un gazoduc (13.5 km) des puits St-Flavien #1 et #3.

1984-85 : SOQUIP procède au forage du puits St-Flavien #7 (sec) et réévaluation de la structure de St-Flavien.

En date de ce jour, les puits St-Flavien #1 et #3 sont toujours en phase production.

3

3- LOCALISATION DU ST-FLAVIEN NO 8

Dans l'optique d'un réservoir souterrain, il importe de bien planifier chacune des localisations de forage, puisque celles-ci seront toutes reliées entre elles par un système de lignes de collecte (phase opération).

C'est avec cette considération à l'esprit qu'il a été décidé que la localisation du St Flavien #8 sera située sur le site même du St-Flavien #3.

Les figures 1A, IB et 1C positionnent le St-Flavien #8 respectivement sur une carte cadastrale 1:20 000 (IA), sur une carte topographique 1:50 000 (1B) et sur le site du St-Flavien #3 (1C).

Mentionnons que le site du St-Flavien #3 (1C) est également le site de la station de compression utilisée pour le transport du gaz via fardiers (GNC - gaz naturel comprimé).

Dans ce rapport, il est important de différencier entre la localisation en surface du puits par rapport à la localisation en sous-surface au niveau du réservoir. Des explications supplémentaires seront fournies dans les prochains chapitres de ce rapport.

4

4- GÉOLOGIE ET GÉOPHYSIQUE

4.1 Géologie de la région de St-Flavier4

Le gisement de St-Flavien est localisé sur la rive sud du St-Laurent à environ 45 km de la ville de Québec, à proximité de la municipalité du même nom. St-Flavien, située dans une zone rurale, est facilement accessible par un réseau routier très bien développé.

La région à l'étude se situe dans le contexte géologique des Basses-Terres du St-Laurent, dans la zone dite "interne". Dans cette zone, des sédiments autochtones et allochtones sont observés.

Les sédiments autochtones sont ceux de la plate-forme, c'est-à-dire des sédiments d'âge Paléozoïque recouvrant le socle Précambrien. Les Groupes géologiques dont est constituée la plate-forme sont le Potsdam, le Beekmantown, le Chazy, le Black River, le Trenton, l'Utica et en partie, le Lorraine. Ces groupes sont dérangés par une série de failles normales (failles en échelon) ainsi que par quelques discordances plus ou moins importantes, dépendant de l'endroit.

Les sédiments allochtones sont ceux de la plate-forme provenant davantage à l'intérieur du bassin et chevauchant ceux de la plate-forme autochtone. Cette zone chevauchée est fort complexe dû aux imbrications multiples causant plusieurs répétitions de séquence (voir figure no 2).

Finalement, ces sédiments chevauchés sont eux-mêmes recouverts par une nappe dite "de la Chaudière", vraisemblablement mise en place par gravité.

4.1.1 Prévisions géologiques (St-Flavien #8)

FORMATION TOIT (m) STRATIGRAPHIE DESCRIPTION ANTICIPÉE SOL MER SOL MER

0 +135

80 +55

--

— - — - - Klippe de

Chaudière 0 +135 - Alternance de shale gris à

gris foncé et de shale gris foncé à noir, aspect lustré, - `— clivage visible. — - -

- Québec City 80 +55 - Shale gris à gris foncé, calcaireux à très calcaireux.

Z _

Présence de lits de grès - — blanc à gris pâle, grains — - — - moyens à grossiers. - .,— _ — L'ensemble contient de la I calcite en quantité variant — - -- de10%à40%. -- -

C - - Trenton 1230 -1095 - Calcaire brun très pâle à - T_ - Black River brun, micro à finement I - Chazy 1285 -1150 cristallin. Interlits de shale

noir calcaireux. Présence — - --

-- d'intervalles de shale gris = _ _ - moyen, silteux, plus ou -1230 -1095 , , moins calcaireux et pyri- _ ` , , 1285 -1150 teux. f i 1

—~~ ` -1405 -1270 t , -Beekmantown 1405 -1270 - Alternance de calcaire blanc ' r

à brun, micro à finement' cristallin et de dolomie blanche à gris-bleu fine-

-1355 --1490

ment à moyennement cris- / 17--1655 -1520 i talline. i / r / r

- Profondeur } F 1 totale 1800 -1665 ~.

i; i -1800 -1665 . ..

Note Vers la fin du forage, il y a une faible probabilité de rencontrer la formation de March qui est caractérisée par un grès quartzeux blanc, ciment calcaireux à dolomitique.

6

4.1.2 Objectifs du forage

Les objectifs du forage St-Flavien #8 sont de natures géologique et mécanique :

- Géologique : obtenir des informations sur la couche couverture et le réservoir en procédant au carottage et à différents essais (diagraphies, interférences, injectivité ...).

- Mécanique : éprouver une technique de forage permettant de diriger le forage en un point précis en sous-surface et éprouver également une méthode de parachèvement.

Plus précisément, ce forage a pour objectif géologique de rencontrer le réservoir du St-Flavien #3, lequel est situé dans l'Ordovicien inférieur, Groupe de Beekmantown.

Le point visé en sous-surface est localisé à 300 mètres au SE du St-Flavien #3 dans la dolomie identifiée "B", à la profondeur anticipée de -1353 m (NM) .

La dolomie identifiée "C" est également un objectif, quoique de moindre importance que la dolomie "B". Cette dolomie "C" est anticipée à -1520 m (NM).

4.2 Sismique de la région de St-Flavien

Le contrôle sismique (figure 3) dans la région de St-Flavien est plutôt mince. De fait, il n'est constitué que de 3 profils acquis par Shell au début des années 70.

Comme l'indique la figure 4, le profil dé 5Q-29 est d'une bonne qualité compte tenu que le contexte tectonique de la région de St-Flavien dérange considérablement la couche sédimentaire.

Le profil 5Q-29 illustre bien ce contexte. Une bande d'énergie plus ou moins horizontale est observée au temps double de 2.0 secondes. Il s'agit de la plate-forme constituée de sédiments autochtones d'âge Paléozoïque recouvrant le socle Précambrien. Une autre bande d'énergie, inclinée vers le SE et présente au temps double de 0.500 sec., dans la partie NW, représente l'écaille chevauchée dans laquelle se trouve le réservoir de St-Flavien #3. Finalement, une troisième bande d'énergie, biseautant en surface dans la partie NW et s'approfondissant jusqu'à 1.5 sec dans la partie SE, représente la base de la nappe de la Chaudière.

Il est important de mentionner qu'aucune signature sismique ne semble être reliée au réservoir de St-Flavien. L'addition d'une couverture sismique supplémentaire a été considérée. Toutefois, la nature et réaction du réservoir à la sismique nous oblige, du moins pour le moment, à rejeter cette considération.

4.2.1 Corrélation géologique - géophysique

La corrélation géologique - géophysique s'est effectuée à l'aide des 7 forages sur ou près de la structure de St-Flavien. Le puits le plus représentatif est celui de St-Flavien #3, suivi des St-Flavien #4 et #5. Donc à l'aide des sonigrammes (figure 5, sonigramme de St-Flavien #3) et de nos connaissances générales des Basses-Terres, le profil 5Q-29 a été interprété. Le résultat de cette interprétation est présenté à la figure no 6.

4.2.2 Emplacement géophysique du St-Flavien #8

L'un des objectifs du nouveau forage (St-Flavien #8) étant de rencontrer le réservoir du St-Flavien #3 à 300 mètres au SE, nous avons choisi d'implanter le forage sur le site même du St-Flavien #3 (voir figure 3).

Nous croyons que les techniques modernes permettent de contrôler la déviation "naturelle" de cette région. Ainsi, ce point visé en sous-surface correspondant à la projection verticale de ce point à la surface, nous situons le forage du St-Flavien #8 au point de tir no 675 du profil sismique 5Q-29.

En termes géologiques, nous voulons aucune déviation dans la mesure où nous voulons atteindre le réservoir dans un rayon de 15 mètres par rapport à la projection verticale à partir de la surface.

Nous réalisons que la déviation "naturelle" de la région de St-Flavien devra être combattue. A cet effet, des outils de forage directionnel pourront être utilisés, le cas échéant.

9

5- PRO~RAMME DU FORAG>+

Dû à la non disponibilité du personnel, SOQUII' a mandaté une firme de

Calgary, ENERCON, pour produire le programme de forage du St-Flavien #8.

ENERCON a assigné monsieur Randy Hawkings à notre projet. Le

curriculum vitae de monsieur Hawkings est présenté à l'annexe A de ce

rapport. Nous constatons que monsieur Hawkings est qualifié comme

ingénieur de forage aux termes du règlement sur le pétrole du M.E.R.

L'annexe B présente la foreuse No 1 de RALEX. Cette foreuse a été

sélectionnée pour réaliser le forage du St Flavien. Celle-ci est bien connue de

SOQUIP, ayant foré la plupart des puits sur la structure de St-Flavien, et

connue sous le nom de foreuse no 6 de Regent Drilling.

L'annexe C présente une description chronologique des opérations techniques.

Cette annexe traite également des pressions auxquelles seront soumis les

équipements.

L'annexe D présente la prévision de la courbe de forage en fonction des

différentes opérations. La durée du forage jusqu'au "casing point" a été

évaluée à 30 jours.

-10-

6- PROGRAMME D'ÉVALUATION

Le système de détection de gaz que nous anticipons utiliser est celui de Datalog Technology Inc. connu sous le nom de Geologger. L'annexe E décrit cet appareil qui est considéré comme le plus performant sur le marché actuellement.

Nous anticipons effectuer trois carottages de 12 mètres chacun, aux intervalles suivant :

- Carotte No 1 : roche couverture, au-dessus du réservoir dans la base de Trenton et/ou toit du Beekmantown.

- Carotte No 2 : dans le réservoir principal connu sous le nom de dolomie "B" située dans le Beekmantown.

- Carotte No 3 : dans le réservoir secondaire connu sous le nom de dolomie "C" située également dans le Beekmantown.

Le programme d'essai aux tiges est indéterminé. Toutefois, nous anticipons faire un minimum de trois essais aux tiges entre 1500-1800 mètres. Nous soulignons que ce forage est réalisé dans l'optique d'un stockage souterrain et, à cet effet, une batterie d'essais devront être exécutés afin de déterminer la faisabilité technique du projet. Ces essais seront planifiés lors du forage.

Le programme prévu des diagraphies est comme suit :

1- Dual Induction 2- CNL-FDC-GR-XYCa1 3- BHC Sonic - GR 4- Dipmeter 5- Intégration totale

- de PT* au coffrage de surface -dePTà1450mKB - de PT au coffrage de surface - de PT au coffrage de surface - de PT au coffrage de surface

NOTE : * PT = Profondeur totale

-11-

7- CONCLUSION

La conversion du gisement gazier de St-Flavien en réservoir souterrain de gaz naturel nous apparaît un cheminement logique. L'excellente position géographique de St-Flavien ainsi que les besoins grandissants de Gaz Métropolitain, sont d'autant d'éléments en faveur de ce projet.

Le forage du puits de St-Flavien No 8 est nécessaire afin de conclure de façon définitive sur la faisabilité du projet. Non seulement ce forage apportera des réponses géologiques mais apportera également des réponses mécaniques qui auront un impact déterminant sur le développement du projet.

La "structure de St-Flavien", la seule à ce jour productrice de gaz en quantité commerciale dans la couche sédimentaire consolidée au Québec, pourrait également devenir la première "structure" à servir de stockage souterrain de gaz naturel dans le Paléozoïque.

LISTE DES FIGURES

FIGURES DESCRIPTION

Localisation du St-Flavien #8 : 1A) - Sur carte cadastrale 1:20 000 1B) - Sur carte topographique 1:50 000 1C) - Sur le site du St-Flavien No 3

2 Coupe structurale des Basses-Terres du St-Laurent

3 Contrôle sismique (région St-Flavien)

4 Profil sismique 5Q-29

5 Sonigramme de St-Flavien #3

6 Interprétation géologique du 5Q-29

7 Coupe géologique (schématique) du réservoir

R i(

Scierie •

' _-/> U ST-FLAVIEN 5

~ zée ae) •

ST-FLAVIEN 3

__A-Air 1

ST-FLAVIEN 7

ST-FLAVIEN B

JOLT 2 • ST-FLAVIEN 4 -

Ferme avicolq .

\ ~ e —~~--

H E N 1~` I ~ — r ' ~ ~ A ~ - - '~~y ` ~ ~-

° ~~~ l~.- ~ ~

~ A~ , _ •

cF~

N---- -f •

._

Sllo, .'• R h„rnp~~ ~ ' _

~

-

..y4 - •

48~ ~' ~ °`"~ i , ~ ----------_-1-/-' /

SiI~.R~ .~1 .~_~ss 2Km ~~ , • e ~ -

~ ,;

REGION DE ST-FLAVIEN , :/

CARTE DE LOCALISATION // 472

-- ~--~

\.°

~ \ -.- -~C.r, i•~-1

Fig. lb

0 , ~jb~ --~

\

usine de cimenl

de rampage

- HtrI see Mu

z z U_

o

o o a

z '

w 12

o cc

U w CO

o r w

IMIT

E N

O, O

E L A

ZO

NE

EX

TE

RN

E

ALL

OC

HT

ON

E

AU

TO

CH

TO

NE

mona3s31i

3tl31Y 3H0013

Fig.2

o co

o

Oa

cf

50QUIP:

REGION ST-FLAVIEN

CONTROLE SISMIQUE

AUTEUR: 1ECHELLE: 1:50 000 GATE:

;Al 1.4kalis~

Yl

~ .

F

Z

r7I

~~

~I

~~i~

:

~

~6 ~:

i

.

~ ~

r

~

~

.~

~•

~

}aJ

3

.

,

~

x~

-F

~ _

.

_

~

~

.

i

~

'

~v~

,

~

]Y

•3~~ ~

~

tv

*

~

.

~

~

;

§~

~

~~

r

~

"

~

5+

~

~.

.

~

~

.. ~

~

~

'

~?

,F

~

_

x

`

t

~

~1~i~~N.aS

;

v .~=- ~ ~ -~

1:.___ -`~— ~~.r

~

s

sâ~

..at . .~ ~.~ :E.~i~--

,~~Ÿ•Y 7 ~~ ~4~

;r~ ~~1A~a ~ T ~ •~~~~ ,~~i_~?

~

~ ~ ~~~ w. -~•• .~~'-►

,~Âi1~

k S~~ ~s

• :

~. ~.ÿi~ ~ ~

r F ` ~~s * 4%:~~:Jv. ~, :~iii ~~~~r 2;h~

s ~~ ~~` T

~~~x~1~ÿ ~.

p~

,7~~V

~

W ~

~~3~~~~!

~.: ~~

.Z

~ ~

~

o

e--sf *J~lt~ re

Fig. 4

3 4000 ~ -3539 :

MARK 4 5000'-4539

MARK

-- TO INT 5870 -5409

JNTGGi d.'cC YcL.^._:+`: L.1G

ONiGRAE Y ANALYSIS~~ ' V _

LYN T rE'. GEOIOGIL

ifOOMMOti 46-31-41 N LAT 71-36-30 J LONG LOCATION

WELL NAME 5BgU1F ET AL ST FLAVIEN N. 3

DATA SOURCE BMC SONIC LOG

5888 TD.corr.

AREA CODE

TO 5870 TOTAL 4860

COMPL.DATE 16 MAR 76

K.B. 461 G.L.444 TD.

AREA QUEBEC

INTEGRATED FROM 1010

INTEGRATION ADJUSTED TO

GEOLOGIC i GEEIN !EEEVRiIO INTERVAL ~REf1ECi.

EGO„AiIO"~I F Kà~°M ; 5Ë.'E°~,_ ;iHiC;";LES', iO~;Sli i! ",1E Nn[f VEl.li1P~E5E~ 5 . e=o w.5=- ~-wn'M,Fv,R

. ~wG-wa.. ..iT PER 5'_..., 1010 -549 000

990 .t23 16.08 8.041: MARK 1 2000-1539 .123 1000! .124 16. 1-1 8.065! MARK 3 MARK 2 3000 -2539 .247

1000 .I21 16.32 8.266

Fig. 5

MARK 1 -

MARK 2 -

.368

1000 .106 17.34'9.409' .474 !

870 .088 18.13 9.864 .563 MARK 4 -

i

E

E O

a z '

0

} }

: È 0 : z- h W o z z a •z a ¢ i W F ~

n?

~

I

a ~ 1

0 e,-,-,' 1 1~ ~ 3on ~ 1 lu

~oC f ~11\

`

4

1-:11.:41111\1111

- 1 a I ~.A►~ 1 1 ~ ~ ~ 1 ~ V

1L i%

l I 0 I} }

ol, _ i

~II\ <J N

a . t:.

}

: •_ } Wl el-

.- 0,.

q z l m 1

;W 1 I C J } I

} I

S= ► I N q \

J

o - n

a é

r d z - t I ô1~~ ~ 1

x \ -.1 \,I 4 ''ti

~ \ \

E E o ô

E 0 s r

1= 11

z E

21a zl~ a n

J1~ ¢

iI2

1 ~

I

E

~ i y

z

~

z

a r)

+

+ z

~

r—

BR

EA

K E

, W Z 9

8 ~

LE

GE

ND

E S

TR

AT

IGR

AP

HIQ

UE

PR

EC

AM

B

FA

ILL

E N

OR

MA

L

FA

ILL

E D

E CH

VE

CT

EU

R 1

MIv

1

E Ô a

z W

<1

E â ~

. E ô

U

Fig. 6

FO

RA

GE

FU

TU

R S

T-F

LA

VIE

N N

o 8

d

FO

RA

GE

EX

IST

AN

T S

T-

FL

AV

IEN

No

3

U ~

r r r

r

r

r r

r

w w 2 ¢ O 0= Lu U I- 0

w a~ •w J = a a

Fig. 7

ANNEXES DESCRIPTION

A Curriculum vitae de Randy Hawkings

B Description de la foreuse No 1 de RALEX

C Chronologie des opérations de forage

D Prévision de la courbe du forage

E Description du Geologger de Datalog

F Programme de boue de forage

G Demande de permis de forage de puits

)-.

ANNEXE A

CURRICULUM VITAE DE

RANDY HAWKINGS

RANDY HAWKINGS STAFF ENGINEER

EDUCATION

Bachelor of Applied Science, Mechanical Engineering, University of British Columbia

EMPLOYMENT HISTORY

1989 - 1988

1988 - 1985

1985 - 1983

1983 - 1979

Present Enercon Engineering Ltd. Supervisor, Drilling Operations

Ladd Exploration Company Senior Drilling Engineer

- all Drilling Engineering including: AFE preparation, drilling programs and curves, rig and service selection, budget-cost preparation, lease construction and reclamation, cost and inventory control, and casing design.

Hi-Tower Drilling Contracts Drilling Engineer

providing marketing and drilling engineering services to the drilling division

- bid and contract preparation - well-history documentation - market surveys and analyses - client-personnel liaison - meterage-drilling programs - performance optimization through field trips

Canadian Superior Oil Ltd. District Development Engineer

- responsible for all development work in central and northern Alberta

- evaluating farm-in and farm-out proposals - evaluating off-set and in-fill drilling

locations - predicting production profiles

generating AFE's, wellbore abandonments, reservoir engineering and economics

Canadian Superior Oil Ltd. Drilling Engineer

- programmed over 150 wells in Alberta and British Columbia, ranging in depth from 800 to 15,000 feet

ENERCON ENG = NE ER I NG LTD _

RANDY HAWKINGS Page 2.

EMPLOYMENT HISTORY (continued)

- worked with various well problems, including lost circulation, H2S gas, foam drilling, over-pressurized zones, sloughing shales, shallow-water flows, coal seams and anhydrite

ADDITIONAL EXPERIENCE

1988 - prepared a manual and instructed a course in rig selection in Equador, South America for SAIT International

1988 - 1985 - instructed Drilling I and II for SAIT Continuing Education

1987 - prepared and instructed my own series, Drilling Technology I and II for SAIT Continuing Education

1990 - 1987 - SAIT Petroleum Advisory Committee member

ENERC ON ENGINEERING LTD-

ANNEXE B

DESCRIPTION

DE LA FOREUSE NO 1 DE RALEX

FOREUSE No 1 INVENTAIRE

MARS 1990

DEPTH RATING

DRAWWORKS

POWERED BY

42501M (144^.^M WITH 114MM DRILL PIPEWITH 10,000da11

OVERPULL

BREWSTER N-Ts (930kW) WITH PARKERSBURG 46 S.R.

HYDR OMATIC AUXILIARY BRAKE

DRAiYWORKS CCJIPQUUD

MAIN PUMP NATIONAL 3-P-30 TRIPLEX 159MM X 215MM (S9TkW)

POWERED BY BELT DRiVEN THROUGH FLOOR MOTORS STANDBY PUMP EMS= D-700 CUPLEX 203kINI x 40ex.M (522kW)

POWERED BY BELT DRIVEN THROUGH FLOOR MOTORS

MIXING PUMP 3-MISSION 127M M X 15zM1M POWERED BY 3-GM-677 N. SERIES SINGLE 82kW (110HP)EACH

ROTARY TABLE BREWSTER RSH22 S52MM 272 TONNE STATIC RATING POWERED BY ORAWWORK$

COMPOUND BREWSTER

PRIME MOVERS 3-CATERPILLAR D-353E 93QAW (12SCHP) TOTAL

SWIVEL GARDNER DENVER SW400 362 TONNE STATIC RATING

HOOK 844360 3 TO TONNE RATING

BLOCK NATIONAL soar 4s3 TONNE RATING

TOTAL HORSEPOWER RIG: 930kW (1z5CHP)

DERRICK . LEE C. MOCHE HEIGHT: 7E (136FT) HOOXLOAD CAPACITY WITH 10 LJNES:207,300a3N(468, 000L8S)

ITEM DESCRIPTION

RESSOURCE NATURELLE RALEX

FI~r.F . , •

584 rang 10 • Ste-Françoise de Lo~:. niére, Qué. • GOS 2N0

•~am-~•

LEE C. MOORE HEIGHT: 5.10M (20FT)

CASING CAPAC,7Y: /33.440daN (300,000LBS)

SET BACK CAPACITY: 222,400dmN (500,000LB3)

ANNULAR: HYORIL 3401.44

RAMS: SHAFFER SINGLE GATE 348MM

SHAFFER SINGLE GATE 348MM

SHAFFER SINGLE GATE 346MM

ALL RATED FOR 34,300kP8 (5.000PSI) MACE TRIM

WAGNER s0SL 2t,00QkPa

RATED FOR 34.500 kPt

10.971 X 2.74M X 1.33M (3 TANKS)

CAPACITY: Ie5CUBICMETRES (I00082LS)

TWO PAY NEAND HARRIS

THOMPSON (TWELVE 700MM COMES)

2.508MM 0D DEGASSERS 30.8MM INLET 758MM DISCHARGE

IN SHAKER TANK

l-125kW GENERATOR DRIVEN BY ONE CAT 3305

1-700kW GENERATOR DRIVEN BY ONE OM 677 M.

15900L (3500 GALLONS)

48 CUBIC METRES (1D 33-b GALLONS)

NAPAMEE 80kW(80HP);590kPt(100PS!)

BELL AUTOMATIC DRILLER

AOTARY TORQUE INDICATOR

MECHANICAL PIT LEVEL INDICATOR

"23â0M OF 114MM GRADE E nRILL PIPE 14.7 kG /Ad )

26 177MM (8 3/4 INCH) S INCH H90

8 229MM (9 INCH) 7IMCH H98

BUILDING3,PIPE RACKS,TOOLS.SUPPLIES,ANO

WINTER COYERING.

SUBSTRUCTURE

BOP STACK

CLOSING UNIT

MANIFOLD

MUD TANKS

SHALE SHAKER

D ESIL TER

POORBOY DEGASSFA

A.C. GENERATOR STANDBY GENERATC.

FUEL STORAGE

WATER STORAGE

BOILER

DRILLING CONTROLS

AD^ITIONAL SUPPORTS

DRILL PIPE

DRILL COLLARS

RESSOURCE NATURELLE RALEX :,r—^ rc.,g 10 • Ste-Frcnçoise Lotbiniére, Qué. • GOS 2h0

ANNEXE C

CHRONOLOGIE

DES OPERATIONS DE FORAGE

S OQU I P

1175, rue de Lavigerie Case postale 10650 Sainte-Foy, Quebec

G1V 4P5

DRI:LI.ING AND GEDLOGICAL PROGRAM

Prepared by Enercon Engineering Ltd.

WELL NAME: SOQUIP St-Flavien No. 8

ELEVATIONS:

G.L. 139.0 m K.B. 145.0 m (estimated)

1) Hole Size: a) Spud and drill a 222 mm, hole to 300 mKB using a fully locked up BHA (see below). b) At 280 mKB round trip drill string and strap pipe. c) Ream out the hole to 311mm using a 311 mm bit with 229mm DC's. Take special care to ensure that the bit follows the pilot hole. d) Casing must be landed in a competent formation. e) Strap out when POH to run surface casing.

The hole will be piloted ahead with a fully locked-up BHA consisting of: a) 222mm bit b) 3-pt non-mag BH reamer c) integral blade non-mag stab d) short non-nag 171mmOD DC (1.8 to 3.1m) e) non-mag integral blade stab f) short non-mag 171mmOD DC (1.8 to 3.1m) g) integral blade stab h) 18-171mm OD DC's (all stabilizers are to be full gauge and calipered prior to RIH). The hole will then be opened up with an unstabilized 311mm bit and 229mm DC's.

SURFAGE E30LE

2

Bottom Hole Assembly:

ST-FLW8.NPS 10/25/91 ENERCON ENGINEERING LTD.

Surface Casing: ) 6

I.D.. 228.6 Drift: 224.7 Internal Yield: 15,700 Collapse: 9,400 Joint Strength: 113,000

Minimum: Optimum: Maximum:

2,580 N-m 3,440 N-m 4,300 N-m

mm mm kPa kPa daN

S O QtJ I P DRILLING PROGRAM St-Flavien No. 8 Page 2.

3

Potential Problems: Also see Mud Program

Lost circulation: None reported.

4) Mud:

5) Surveys:

None reported, but drilling could be very hard under the glacial till.

Deviation is a problem on all wells in the area, this is why piloting ahead will be used.

See Mud Program. This program is to be used as a guide only. Keep mud weight as low as possible. Add gel and lime for viscosity to keep hole clean. Increase vis to 90-100 to run casing.

Directional single shots will be taken every 30 m from surface. Attempt to maintain less than 1° deviation with a maximum dog-leg severity of 1/2° per 30m. NOTE: Penetration rate must not be sacrificed (with low WOB) to keep the hole within these limits as the hole may be directionally drilled in any event -- severe doglegs (> 3 per 30m) are the only serious complication to be prevented.

a) Set 245 mm, 48.1 ku/m. H-40, ST&C, Casing. b) Equip with a guide shoe, and a float collar one joint up. Install centralizers such that the surface casing is adequately centralized at the top and bottom and at 50 m intervals. Thread-lock all connections on shoe joint. c) Rotary tool depth must be confirmed by using casing to circulate hole clean of fill. Circ and work casing a minimum of 45 minutes prior to cementing. Land casing 0.3 metres off bottom prior to displacement.

Gravel:

Deviation:

Minimum Performance Properties: Recommended Torque

ST-FLATS 102591 ENERCON ENGINEERING LTD.

S CDQU Z P DRILLING PROGRAM St-Flavien No. 8 Page 3.

7) Cement: Cement surface casing using Oilwell Class "G rs

cement plus 3% CaC12.

a) Cement full length. Normally run 50% excess. If lost circulation occurs or a washout is suspected use 75% or 100% excess depending on the severity of the problem. If cement is not returned to surface notify the area ERCB office and top up the casing annulus.. b) Use top and bottom displacement plugs. Ensure that the correct plug is sent as a wiper plug. c) Use only clean fresh water for mixing purposes. Obtain mixing water from town or river only. d) Pump only calculated displacement volume. Measure displacement volumes from tank to ensure accuracy. e) Pressure test casing using cement truck to 7000 kPa after plug down.

8) W O.C. and Casing Bowl: a) W.O.C. twelve (12) hours before cutting off the casing. b) Surface casing bowl flange is to be flush with ground level. c) Install a 279 mm by 21,000 kPa weld on casing bowl with 2 - 2" flanged outlets. Equip the bowl with a 2" gate valve and blank off the other flange.

9) Pressure Test: a) Pressure test the surface casing, BOPs, manifold, stabbing valve and kelly cocks to a low of 1,400 kPa and a high of 7,000 kPa for 10 minutes each. Check motor kills, remote BOP station and accumulator operation. b) Commence drilling out cement 24 hours after plug down of surface casing. While drilling out float, cement and shce, do not exceed 5000 daN on bit and 70 RPM. Until the top of the drill collar string is below the bottom of the surface casing, do not exceed 100 RPM and 2/3 collar weight (at 85% buoyancy factor).

ST-F X 8 . APS W2591 91 ENERCON ENGINEERING LTD.

S CD QLT I P DRILLING PROGRAM St--Flavien No. 8 Page 4.

NiA I 3v a Lf E

1) Hole Size: Drill out and drill a 222 mm hole with a locked up BHA (see below) to FTD as directed by the weilsite geologist. It is the intention of the drilling operation to keep the bottomhole target immediately under the surface location (within a 15 metre target radius). If the well starts to deviate significantly, the wellbore will be turned back with a mud motor and MWD. This procedure will only be initiated after consultation with SOQUIP head office. After the correction motor run, a decision will be made to either drill to total depth with a slick BHA or return to bottom with the locked-up BHA.

2) Potential Problems: Also see Mud Program.

Lost Circulation: None reported, but always possible as the target formation is underpressured at 4480 kPa (2.9 kPa/m).

Deviation: Severe on all offset St-Flavien wells.

H2S: None reported.

Abnormal Pressures: Pockets of fracture gas could occur uphole, be prepared to weight up if necessary.

3) Bottom Hole Assembly: Fully locked-up BHA consisting of: a) 222mm bit b) 3-pt non-mag BH reamer c) integral blade non-mag stab d) short non-mag 171mmOD DC (1.8 to 3.1m) e) non-mag integral blade stab f) short non-mag 171mmOD DC (1.8 to 3.1m) g) integral blade stab h) 18-171mm OD DC's (all stabilizers to be full gauge and calipered prior to RIH). A directional drilling BHA with low-speed mud motor and measurement while drilling (MWD) will be substituted if required to turn the hole back under the surface location (see directional program).

ST-FL! 8.wPS 10/25/91 ENERCON ENGINEERING LTD -

SOQIJ=P

DRILLING PROGRAM St-Flavien No. 8 Page 5.

4) Mud:

INTERVAL m KB

DENSITY kg/m3

VISCOSITY WATER LOSS sec/I cc/30 min REMARKS

28 no control 300-1200

1200

as low possible

Drill with Floc water or very low vis/density mud

Circulate hole to mud or adjust mud properties

1200-FTD 1040-1120 40-45 6-8 cc Increase vis to 80-90 for logging and testing.

a) Annular velocity must not exceed 38 m/minute. b) Keep solids below 7%. c) Premix mud while WOC on surface casing. d) Have mud-man run water analysis on make-up water.

5) Surveys: Maximum interval between main hole surveys is 50m. Maximum deviation from vertical prior to initiating directional drilling will be decided in consultation with the directional company to avoid severe doglegs when turning the well back toward the downhole target. Maximum rate of change of angle is 3°/30m. NOTE: Penetration rate must not be sacrificed (with low WOB) to keep the hole within these limits as the hole may be directionally drilled in any event - severe doglegs (> 3 per 30m) are the only serious

ANTICIPATED GEOLOGICAL TOPS:

complication to be prevented.

K.B. (est) ANTICIPATED SUBSEA TVD (m) BOTTOMHOLE im1 145.0 m PRESS. (kPa)

FORMATION

Klippe de la Chaudiere + 135 10 Quebec City 60 205 Trenton / Black River - 1095 1240 Chazy - 1150 1295 Beekmantown - 1270 1415 Dolomie "B" - 1355 1500 4480 kPa Dolomie "C" - 1520 1665

FTD . - 1605 1750

Note: All depths are True Vertical Depth (TVD).

ST-FL,'a8 . w'PS 10/25/91 ENERCON ENGINEERING LTD.

S CDQLJ = P DRILLING PROGRAM St-Flavien No. 8 Page 6.

SAMPT.FS :

a) Catch samples as required by the wellsite geologist and SOQUIP office. b) Catch samples as required by the Province of Quebec well licence.

3 cores are planned, 1 in each of the reservoir rocks and 1 in the cap rock to evaluate rock compressive strengths. The cores are all to be oriented cores to give dip information.

CORING PROGRAM:

DRILL STEM TESTING: All tests to be conducted as directed by the SOQUIP office.

DRILL STEM TESTING PROCEDURE:

1. All tests are to be called as directed by SOQUIP office. 2. Have tester bring both dual conventional and inflatable tools to

location 3. All conventional tests will be run using dual packer. 4. Circulate sub, safety joint and hydraulic jars will be run. 5. For straddle tests, ensure that a recorder is run below the

bottom set of packers. 6. Run a recorder above the shut-in tool on all tests. 7. Preflow time: SAB - 5 min., FAB - 10 min., WAB - 15 min. 8. Initial shut-in period - 60 minutes. 9. Call SOQUIP office 15 minutes into main flow. 10. Ensure that the drillpipe recovery is well sampled (minimum of 3

samples, top, middle and bottom). Oil recovery will be centrifuged and % of oil, water and mud reported.

11. Ensure that all samples are properly labelled. 12. Ensure that a Phone-Fax is on the location. 13. Use a 2" critical flow prover for all gas flow measurements.

LOGGING PROGRAM:

1. Dual Induction 1:600 scale from TD to surface casing a) 0-50 ohms resistivity scale b) Linear scale c) 0-500-1000 conductivity d) SP on 15 mv/cd scale

1:240 scale from TD to surface casing a) Logarithmic scale

ST-H.1:1,8 , 6PS 10!25; 91 ENERCON ENGINEERING LTD.

SOQU = 1? DRILLING PROGRAM St-Flavien No. 8 Page 7.

LOGGING PROGRAM: (cont'd)

2. CNL-FDC-GR-Cal 1:600 scale from TD to 1450nKB a) 2000-3000 kg/m3 bulk density b) 0-150 API units gamma ray scale

1:240 scale from TD to 1450mKB a) 0-60% limestone porosity b) Repeat over Dolomite on limestone scale

(-15 to +45) Run PES Curve

3. BHC Sonic-GR TD to surface casing a) integrated

4. Dipmeter

HOLE VOLUME LOG

DATA TRANSMISSION

PRODUCTION CASING:

TD to surface casing

a) dual arm caliper T.D. to surface casing

a) As instructed by Wellsite Geologist in communication with SOQUIP office.

Size(mm) Interval(m) Mass (kg/m) Grade Connection

177.8 FTD - 1200 38.69 J-55 LT & C 177.8 1200 - 25 34.23 J-55 LT & C 177.8 25 - 0 38.69 J-55 LT & C

Equip with a guide shoe and a float collar one joint up. Run a marker joints 2 joints above each of the pay zones. Place centralizers, one per joint from 30 m below to 30 m above any potential pay zone, below float collar and above shoe, and up-hole every 50 metres to the cement top. Place scratchers as dictated by the SOQUIP office.

Note: There is the strong possibility of either an open-hole completion with staged cement job or a conventional staged cement job. This will be determined after logging and testing, and only after consultation with the SOQUIP head office.

ST-?LAV8.i«TS 10/25/91 ENERCON ENGINEERING LTD.

S CDQLT I P DRILLING PROGRAM St--Flavien No. 8 Page 8.

PRODUCTION CASING: (cont'd)

Minimum Performance Properties:

177.8mm, J-55, LT&C

38.69 kg/m 34.23 kc7/m

I.D.: 159.4 mm 161.7 mm Drift: 156.2 mm 158.5 mm Internal Yield: 34,300 kPa 30,100 kPa Collapse: 29,800 kPa 22,500 kPa Joint Strength: 163,200 daN 139,200 daN

CEMENTING: a) Production cement: see cement program b) Filler cement: see cement program c) Due to the fact that this will probably be a staged cement job, all cement blends are to have prior approval by the SOQUIP office.

a) KEEP HOLE FULL AT ALL TIMES. Pay close attention to gas cutting of mud and especiallyt the rate of change of well slope or direction (doglegs).

REMARKS:

GENERAL INFORMATION

Abandon. Plug Logging: TBA Bits: Casing & Float Equipt: Casing Bowl: Casing Trucking: Cementing: Centrifuge: Construction: Coring: Core Analysis: Directional: Drill Stem Testing: Logging: Mud: Mud Trucking: Power Tongs: Rentals: Rig Rig Move: Firm Bid by Contractor Sample/Fluid Analysis: Shacks: Stabilization: Trucking: Water Truck:

ST-FI:hV8. ATS 10/25,91 ENERCON ENGINEERING LTD.

E3 O QU Z P DRILLING PROGRAM St-Flavien No. 8 Page 9.

REPORTING TO: SOQUIP (418) 651-9543 FAX (418) 651-2292

Henri Lizotte (Res)

Enercon Engineering Ltd. (403) 266-7095 FAX (403) 262-8085

W.R. Hawkings (403) 252-9469 (Res) H.J. Gonzalez (403) 281-9315 (Res)

Second Draft - 10/25/91

ST-FLTS.AP5 10,/25%91 ENERCON ENGINEERING LTD.

ANNEXE D

PRÉVISION

DE LA COURBE DU FORAGE

SOQUIP St-Flavien No. 8

Drilling Curve ---0--- Proposed -- Actual

_

_ _

'•, Drill 222: Pilot Hole

, ,

CC:

Statûs:

_ -

J

ao----: ha out to 3111m, run 245nn casing, 'AC, BOP

_ -

i 1

Drill 222nn

'

Main Hole a/ Fully Locked-Cp BHA.

_ 4

_ _

_ _ _

Use Mud Motod /

and RD to bring deviation beck

_ ., 39 $ and Dolomie B

C

-

_ ri

Ore, cap rock

10 n core in Dolomie

r =

_ Drill ahead to Core Pt #1 '~

i,

~' Drill to Fil] p 1750 na

=

-

Drill ahead to Core Pt 12 ', /

°-~ Leg, 3 DST's, Production Casingi

1 I 1 I I I I I I I l i i I IIII 1[ 1 1 I T I I J 1 1 1 1

0

5

10 15 20

25

30

35

DAYS

0

200

400

600

D E 800 P T H 1000

m K B 1200

1400

1600

1800

ENERCON ENGINEERING LTD.

ANNEXE E

DESCRIPTION

DU GEOLOGGER DE DATALOG

tl,ciAvatul

Geologger

The geologger is a revolutionary well site gas detection system. Datalog has computerized the total gas detector to the point where functions that used to be performed by the Weilsite Geologist or Mud Logger are now performed by the Geologger.

The System:

The geologger is compact and lightweight with a size of 6'xl2"xl5" and weighs approximately 15 lbs. The system contains a CMOS computer with liquid crystal display and a numeric keypad. The gas sensor and silent sample pump are all contained in the system. The Geologger has a rechargeable battery that will power the system should the power fail, a printer provides a hardcopy of the gas curves, ROP, drilled depth. Both the software and the hardware are designed to require the minimum amount of user supervision.

Use:

The Geologist or Logging Analyst can set alarms for drilling breaks, high gas, depth and time. The system will sound alarms for power failure and for interruption in gas flow. All alarms are displayed on the screen. The Geologger calculates the rate of the penetration and will lag back the sample depth. Also, it will print them both on the screen and hardcopy. The sensor will not saturate nor is it flow sensitive. The sensors have extremely long lives and they will not burn out the like hotwires.

Printout:

The printout contains the gas curves, ROP, rig status, actual depth with depth ticks, and the lagged depth; a numeric value of the gas is printed out for quick reference. The gas is plotted on 4 logarithmic scales so the gas can never go offscale. If the printer is off line, the computer will buffer the information until the printer is back on line. The 8 1/2"x 11" printout is easy to read and interpret.

kr

n1 f

1 1 a

if

(

( a

lÎï

~~t~ ~ iwi

~ ~ ' 0077 0077

0077

007.5IDEPTH ROP MIo ~

~ ~GAS VALUE 0081

~

~ 0086 0085 0090 0091 0093 0093 1351 0095 0095 0099 01C0 1352 0104 0107

Ô1~ 0100

~1353

0074

074 073

~ 65 0059 0052 0059

1354

0033

ôô 0042

âôbâ 0057 0051 0044

1355~ DEPTH 0038 0035 0033

- 1364 005.0 OÔ Ô 1356 0048

— 0053 _ 0055

- 1365 005.7 0~0~6~7 1357

0090 1358 0315 1359

— 0545 1360 — 3518 13k5.

1656 1362 — 1366 007.2

Q~1 — 0113

0096 _ 0080 0066

— 0060 0051 1363

— 0042 _ 1367 009.6 0

0038036

— 00~34 1364 0034 000d`3~7

— 0036

— 0038

0 1365 _ 1368 010.1 ~~

0033 — 0033

LIERTH LUi3

IDEPTH EVENT

i353

1354 007.6

— 1355 007.3

— 1356 005.7

1357 004.8

1358 002.3 1354 001.1 1360 000.7,1361 000.5

1362 001.2

'OFFBTM

- 1363 004.4

ANNEXE F

PRO GRAMME

DE BOUE DE FORAGE

ENERCON ENGINEERING

SOQUIP ST - FLAVIEN NO.8

QUEBEC

OCTOBER 16, 1991

MUD PROGRAM

M'IDriIIing Fluids `ACC .A Dresser nail Mrton C:.rroarry

SOQUIP ST - FLAVIEN NO. 8

QUEBEC Page 1

COMPANY: ENERCON ENGINEERING

ATTENTION: MR. W.R. HAWKINGS

üuj.: SOQUIP ST - FLAVIEN NO. 8

LOCATION: QUEBEC

ACCOUNT REPRESENTATIVE: KEVIN KING

PHONE: 290-5342

PREPARED: GARTH FAREBROTHER, TECH SERVICE

DATE: 1991.10.16

M-I Drilling Fluids Canada, Inc.

SOQUIP ST—FLAVIEN #8 Quebec

Estimated Days: 35 -45

Formation Depth (m)

Hoie/(Csg) Size (mm) i

Mud System Comments

GEL / CAUSTIC SLURRY

311.2 Interval: 0 - 300 m Density: 1070 - 1120 kg/m3 Possible Lost Circulation

(244.5) Viscosity: 45 - 50 ill- 60 - 80 s/L for Casing

pH: 9.0 - 9.5 Possible Gravel near Surface

Fluid Loss: Natural

Surface Casing r 300 I •

POLY -PLUS G

222.2 Interval: 300 - 1800 m Density: 1070 - 1130 kg/m3 Tight hole on connections

Trenton / Black River 1250 (177.8) Viscosity: 45 - 60 s/L 70 - 80 s/L for Casing Reaming to bottom after trips.

Yield Point: 8 - 12 Pa Chazy 1310 pH: 9.0 - 9.5 Solids Buildup

Fluid Loss: 8 - 12 cc/30 min Polymer Excess: 1.7 - 2.0 kg/m3 Slow drilling due to deviation

Beauhamois 1440

Dolimie B 1525

Dolomie C 1705

T.D. 1750 1800

Supervisor: Andy Dufresne Blackfaids, Alberta 885-4777 551-9803

(TAS) 346-4454

M'IDriIling Fluids ~ S~UIP ST — FLAVIEN NO. $

® Magceoar ,MCO A Dresser riaienurton Comoanv

QUEBEC Page 2

SURFACE HOLE

Interval 0 - 300 m; 311.2 mm hole, set 244.5 mm casing

Anticipated * Gravel. Problems * Potential lost circulation.

* Work tight hole.

Mud Type NATURAL GEL/CHEMICAL

Mud Additives NATURAL GEL, CAUSTIC SODA, SODA ASH, lost circulation material (SAWDUST, KWIK SEAL) if required.

Preparation 1. Prior to spudding, have the mud tanks cleaned of any cuttings, silt, etc. and filled 1/2 to 3/4 volume with fresh water.

2. Check the hardness of the make-up water and lower the Ca++ concentration of the water in the rig tanks to 100 mg/1 or less with SODA ASH.

3. Add.0.7 - 1.0 kg/m3 of CAUSTIC SODA slowly through the chemical barrel to increase pH to 9.0 - 9.5.

4. Add NATURAL GEL @ a rate of 4 - 6 minutes per sack to obtain an initial funnel viscosity of 45 - 50 s/L or as hole conditions dictate.

Drill ahead with the GEL/CHEMICAL system and adjust mud properties as required.

Mud Properties Density 1070 - 1120 Kg/m3 Maintain as low as possible with water dilution, desilting and dumping of tanks as required.

Viscosity 45 - 50 s/L pH 9.0 - 9.5 Fluid Loss No control.

NOTE: Prior to reaching casing point, the viscosity should be increased, if desired, to 60 - 80 s/L or as required to ensure good hole cleaning.

Potential Drilling Problems:

1. Lost circulation is generally to be expected while drilling in the loose unconsolidated sand and gravel that are common to surface formations. Maintain the mud density as low as possible, subject to hole conditions and formation pressures. In the event of lost circulation, raise the viscosity with Gel and small amount of Lime to 50 - 60 s/L and slug with Sawdust and Kwik Seal at a 5:1 ratio, until achieving full returns.

2. Lower the yield point and Gel strengths as low as possible after running casing and prior to cementing. This is to ensure better mud displacement by the cement.

3. If gravel or boulders are encountered in the unconsolidated formations near surface, increase the viscosity to 60 -- 80 s/L with NATURAL GEL to provide a greater carrying capacity.

rDriilln fluids NISIMEINO Maqnoar g C.esse,Ha,ourron Company

SOQUIP ST - FLAVIEN NO. 8

QUEBEC Page 3

RAIN HOLE:

Interval 300 m to T.D. (y1800 m): 222.2 mm hole, set 177.8 mm casing

Anticipated * Reaming and cleaning after trips Problems * Solids buildup

* Tight hole on connections * Deviation from faulting

Mud Type

Mud Additives

POLY-PLUS G

NATURAL GEL, POLY-PLUS, CAUSTIC SODA, STAFLO, SPERSENE CF, SODA ASH, KELZAN XCD, BICARBONATE.

POLY-PLUS is a high molecular weight anionic polyacrylamide. It assists in shale stability, viscosity and fluid loss control. The low solids nature of the poly-plus system provides maximum rate of penetration by increasing the available horsepower at the bit.

Preparation and Drillout 1. While W.O.C., ensure the mud tanks are cleaned thoroughly and filled 2/3 - 3/4 full with fresh water.

2. Check the hardness of the make-up water and lower the Ca++ concentration of the water in the rig tanks to 100 mg/L or less with SODA ASH.

3. Then add the following material in the order listed:

a. Add 0.7 - 1.0 kg/m3 of CAUSTIC SODA slowly through the chemical barrel to increase pH to 9.0 - 9.5 to enhance the yield of the GEL.

b. Add 30 - 35 kg/m3 of NATURAL GEL slowly through the hopper. Do not mix faster than 6 - 7 minutes/sack.

c. After the GEL has been mixed, add in 4.0 - 4.5 L/m3 of the POLY-PLUS POLYMER at IO - 20 minutes/pail.

Drill out the casing shoe and cement with water, discarding cuttings to the sump. After all cement has been drilled, revert circulation to the rig tanks and treat out any remaining calcium with Bicarbonate of Soda.

Mud Properties

Drill ahead with the POLY-PLUS G system and adjust mud properties as required.

Density a) 1070 - 1130 kg/m3 b) Balance with Barite as pore pressures

dictate.

Viscosity 45 - 60 s/L Increase as req'd with NATURAL GEL and KELZAN XCD to clean the hole.

â®QüIP ST FLOM NO. 8 MIDrilling Fluids (~ Aa0co7ar COM - =+sser ~a• our v+C mow'

QUEBEC Page 4

Solids Content

Poly-Plus Concentration

if a prehydration tank is available premix the NATURAL GEL and allow time for the Bentonite to hydrate fully.

GEL should not be mixed faster than 6 7 min/sack and additions should be adjusted so you do not have more than 5 -- 8 s/L rise in viscosity.

At all times while drilling with this sytem, additions of fresh water are necessary to maintain desirable rheological properties. Water additions should never be stopped totally, and often, increasing the water additions will improve the viscosity and fluid loss control by allowing full hydration of the bentonite and polymer.

With the recommended mud densities, the PV should be in the 8 - 15 mPa.s range.

8 - 12 Pa with KELZAN XCD

The Gel Strengths should be kept at a minimum to prevent any swabbing and/or pressure surges while tripping. The LO sec. Gel Strength should be approximately 2 - 5 Pa and the IO minutes gel @ 4 - 10 Pa.

9.0 - 9.3

8 - 12 cm3 is the normal range of a POLY-PLUS G system. If a lower fluid loss is desired, add small amounts of STAFLO or STAFLO EXLO, depending on viscosity requirements. STAFLO should not be mixed faster than 30 - 40 min./sack.

Maintain below 0.06 volume fraction by mechanical means, water dilution and tank cleaning. Because drilled solids will absorb the polymer, solids content should be minimized to avoid ineffective addition of the expensive polymer.

Maintain the excess concentration at 1.7 2.0 kg/m3. Monitor all fresh water additions and add the appropriate amount of POLY-PLUS to maintain at this level.

NOTE: a)

b)

c)

Plastic Viscosity

Yield Point

Gel strengths

pH

Fluid Loss

SOQUIP ST — FLAVIEN NO. 8

M4DriIIing Fluids 4 Magcogar iMCO 4 presser -a n,r!pn G,rnoam

QUEBEC Page 5

Bentonite Concentration

AST is the check used to give the concentration of BENTONITE. Initially maintain in the 35 — 45 kg/m3 range using the prehydrated Gel. The Bentonite concentration may be greater than 45 kg/m3 depending on viscosity requirements.

Maintain at 100 mg/1 or less by precipitating Ca++ with SODA ASH.

Maintain an annular velocity of 35 — 40 m/min. while drilling to ensure adequate hole cleaning and avoid turbulent flow. Excessive flow rates will induce erosion due to turbulence characteristics.

To ensure good hole cleaning at T.D., the Funnel Viscosity could be raised slightly for the last portion of the hole. However, if the hole has been cleaning properly while drilling, we recommend minimal viscosity increase to avoid shocking the hole.

At T.D., we recommend circulating 3 — 4 bottoms up times to ensure the hole is cleaned of cuttings.

Trip out slowly to avoid swabbing the hole. A rate of 50 — 70 sec/stand is recommended.

Since the NATURAL GEL and POLY PLUS alone may not obtain the Yield Point desired,small additions of KELZAN XCD Polymer are recommended in increments of 0.7 — 1.0 kg/m3. Do not add the XC faster than 50 minutes per sack; otherwise, the rapid viscosity increase may be difficult to control. Also, adding XC polymer will help to reduce "n" value and increase the consistency Index "K". Reducing "n" provides a

shear thinning fluid and hence improved hole cleaning and penetration rate. Increasing the "K" relates directly to raising the overall viscosity.

Ca++ ion Concentration

Annular Velocity

Testing, Coring and Logging

NOTE:

OUI 8T Y PLAVIEN NO. 8 M IDriIIing Fluids 4 A Dresser -a, ourton Ccmoarn

QUEBEC Page 6

Porential Drilling_ Problems:

1. Tight hole on connections and reaming to bottom after trips are common occurences in this area. The slickness and encapsulating properties of the POLY PLUS polymer will minimize the water wetting tendencies of the exposed formations, but viscosity and possibly density may have to be increased to control and maintain adequate hole cleaning.

2. Abnormal pressures should not be a major problem on this project. Maintain the density as low as possible for optimum drilling rate. An increase in density should be required only if hole cleaning problems develop.

. Care must be exercised when tripping to prevent surge and swab pressures. Trip speed should be calculated with the existing mud properties to minimize swab pressures. Ensure that the mud density is sufficient to balance bottom hole pressures.

. Deviation will probably be a serious concern on this interval. Although this cannot be addressed directly by the drilling mud itself, the hole stabilizing properties of the system will help to minimize problems that may occur from the additional time required to control-drill the section.

wE

ll N

AM

E: S

OQ

UIP

St -

Fla

vic

n N

o. 8

MA

TE

RIA

L E

ST

IMA

TE

Q

ueb

ec

,._,

L C 54

v

,

• 8 8F 2 09 8? 8 8s n.: O et

aC0 8 ~ oc, N ~ a~o O ~ n Om c Q --- ~N~r^r^ c„:" ,c cR ~ 44 isr ~

44 44 4 N

~44 rU

Ln rr ri

c-Z

e:6.

_

E r~ :..

~ —

Q o0 00 0o M N. O oo C .. M o0 .+ -

bl r+ v V

. 11 _

Z

:.0~

MA

IN

300 -

180

0 m

22

2.2

mm

177. 8

mm

U~ C Cr;

SF F-. NS a. 8 S 8 ~ ~ '

~ Q ~ H~ M r ~- ONi O N N ~0 ~0 44 44 44 44 c~1 . en" 44 44 44 44 K 44- 44 -

To

tal —

:

$2

5,0

78

.15

1

UN

ITS

O O Q^ • t0 m to 0 O VS ~ N /1 ^ i N

SU

RF

AC

E

0 -

300

31

1.2

mm

24

4. 5

mm

~ C C.r

p O .r1 C O V~ Q O h GO ,...1 Q . 00 v1 .. -

~ ~ ~ ~ CO ~ N

o~ ~ 44 N44 44 N

44 N 64 44 .

Cr'.. r;

C.; ~

~

II - C

Z ~

54Cao C t+1 N Oo cr. C ..

N in

',, ... . .. . .. .. . .. . ... .... .

-'

~

r 1 ~ ~ D

EP

TH

:

110

1,E

SIZ

E:

CA

SIN

G S

IZE

:

~ UF7 C (.;

s ,.11:1 ~ Ci S o~0 000 0N O~ ~ Ô

~ ~ ~ M N ~ N b Ce., N ~ 44 44 44 44 44 44 44 44

44 ~ 44

_— Z ~

N G!1

f4.,. 88~ r 8 ° ~ 88 ~ ~ O C oo N Ô vi ri vi vi 0ô ti -cr R N S 'Cr. N N N

PR

OI)

UC

"I'

LL.

â~ U ,_

i"'_, ~ = Qi ÿ . ~ y r cC ^., ~ Q p . U ❑ ~ =

~ T 1- co y ÿ ~ (C ~ •p =

î r Si ~ 3 -

~ Z C. v~

ri ~ ~ U v j ~C ~ v~ i

ANNEXE G

DEMANDE DE PERMIS

DE FORAGE DE PUITS

pagel Annexe 2 (a15)

Syr

GOUVERNEMENTDUQUEBEC MTh1STERE DE L' ETERGIE ET DES RESSOURCES

Demanda de permis de forage cfepuits LcJ.srrrfezsmin= chaa 645 ait 191

Nomdupuits: S0QU1P S7-FI.AVIEN NO B

Numéro du perms de recherche ou du bail d'exploitation: 103

Nom et adresse du titulaire du permis de recherche ou du bait d' atic : SGQUIP

1175, rue de Lavigerie Ste-Fay (Québec) 81v 4P5

NQrnetadressedel'entrepreneur: Ressource Naturelle Raies Inc.

684, Ran5 10 `ite-rrançoise de Lotbtniire iQuébec) fiUJ 2N0

Localisation du forage : Ca1â7r1: Lot: P-299 : :t-Joseph NE Par1)111:60; St-F1avlen

Coordonnées rectangulaires:

5 153 220 Nord UTH

301 840 Est UTH {KM

zone:

Coordonnées géographiques : 46'30'20" N 71°34'50" W

Elévation du sol : 135.° mètres au-dessus du niveau de la mer

Elévation de la table de rotation : 140.0 métres au-dessus du niveau de la mer

Datedu début des travaux : 6 janvier 1992

Profond9Urtptaje prévue : 1 B00 mites (verticale)

Programme detubage et de cimentation :

fonction diamètre poids type profondeur ciment/additifs

Surface 244.5 48.1 kgio 1{_40 300 a Classe "G" + 2% Ca Production 137.8 _34,28 4,../r4.1415 P.T.-Surfact Classe "G" t addit'

12 f;

Annexe 2 (a. 15)

page 2

CiOUVERNENCENT DU ()MEC MINLSi'ERE DE L :I gr GIE El" DES RESSOURCES

• Demande de permis defo rag eda puits Lcvsur lesminkss, 1.Si9T, cha,a.« 161

~

Description des caractéristiques des équipements anti-éruption :

ieturateur annulaire

Hydrt 1 7E46 mm 34 500 k:Pa

8Itnd rao. SnatFor a4b m 3W kYa

"Pipe ram" Shaffer 346 mm 34 500 kPa

"Oril11ng spool" 346 mm, 34 E00 kPa avec deux sorties de 50 mm et une vanne de gontrôle ï ouverture automatique

"Pipe ram" Shaffer 346 mm 34 500 kPa

qupedliallières• I- Apris évaluation. le puits pourra étrt

obturé de la profondeur totale jusqu'à la base du dernier réservoir

avant ltmise en place du coffrage de production.

2- La cible à profondeur totale est directement sous la localisation en surface, due à la tendance naturelle de dévier vers le NE, le puits

sera foré directionnellement pour le rorsener é la pible,

Nom et adresse de l'ingénieur de forage responsable de l'exécution destravai. : Randy Hawkings

Enercon Engineering Ltd

420, 510 - 5th Ave. S.O. _ Pte: Superviseur - opérations

Calgary. (A1 ert 1 T2P 352 Tel.: (4031 266-7095 Signature: l~l. #u /

PE144; Cam:_ V. Alevern4 1991

Nom duresponsable: Nervi Lizatte Te: 651-94543

Cie (opérei>cu) : Ate: 175. rue 4e Lavigerie

Ste-Foy (Québec) G1Y 4P5

(418) 651-9543

Sig1 KLlLl1II.

Intervenant

Sous-catégorie

Grande-catégorie

4) t

w

x x X

DES

CRIP

TCY

E

c=i ~

O O 0

L

N L co 4) N O ++ to L

o v r- m

L

or

) É L

~'.

a

â O â ô ô v)

~ \

0

4.1 >

.0 a a U 1+ 1-Y L 4) (C a n o N

o pré-archivage

Basses-Terres, sédiments consolidés

Rappo

rt de fin forage

y 4) C E

L 3 4) 4-, U u) y

4)

WL

a

.O

w ü ~ N

d Q

d w

O

7 W

~ �

~ \ p ÿ

TC L ~ L Q u

~ d M

C 5 -8 O Y - al tO

~ J ro L 0

WX

~ L0 ~

L • }1 ~ L

ô m O L ^" 4 J U., L1 trJI

¢

FÉVRIER 1992

14277 ex. /

°I ( o A ai6 -C

SOQUIP ST-FLAVIEN NO 8

RAPPORT GÉOLOGIQUE

FIN DE FORAGE

CLAUDE MORIN

1PRÇ;r4\- t a

GÉONIROM INC. 2506, rue Beaumont St-Romuald (Québec) G6W 6K8

TABLE DES MATIÈRES

I- RÉSUMÉ

1- Permis de forage

II- INFORMATIONS GÉNÉRALES

III- GÉOLOGIE

1- Sommets des unités lithostrz tigraphiques

2- Corrélation TVD St-Flavien (Sommaire)

3- Carottes

4- Diagraphies

5- Essais aux tiges

6- Relevés de déviations

IV- APPENDICES

1- Rapports géologiques journaliers

2- Rapports de forage journaliers

3- Description détaillée des retailles

4- Description des carottes

5- Strip log

6- Représentation géologique du puits

7- Résultats des essais aux tiges

8- Diagramme du puits

9- Programme de boues

10- Liste des trépans

11- Coffrage et cimentation

I- RÉSUMÉ

SOQUIP St-Flavien No 8 a été foré sur le bail de production no 103 des Basses-Terres du Saint-Laurent par la foreuse RALEX No L Le forage a

atteint la profondeur de 1 717 mkb.

Ce forage avait pour objectif géologique de rencontrer le réservoir du St-Flavien No 3, lequel est situé dans l'Ordovicien inférieur, Groupe de Beekmantown. Le point visé en sous-surface est localisé à 300 mètres au sud-est de St-Flavien No 3 dans la dolomie "B". La roche couverture ainsi que la dolomie "C", quoique de moindre importance, était

également des objectifs.

Le forage a traversé 12,81 mètres de Quaternaire, 40 mètres de la '<lippe de la Chaudière, 1 166 mètres du Groupe de Québec City (Gr. Laurier), 84 mètres du Groupe du Trenton, 124 mètres du Groupe de Chazy et 283 mètres du Groupe de Beekmantown.

Dix (10) carottes ont été récupérées pour un total de 62,68 mètres de roches. Elles se répartissent comme suit : 4,98 mètres dans le Québec City et 7,60 mètres dans le Groupe du Beekmantown pour l'objectif de la roche couverture, 10,5 mètres dans une nouvelle zone désignée "H" dans le Beekmantown, 24,60 mètres dans le réservoir (dolômie "B") du Beekmantown et 15 mètres dans la dolomie "C" du Beekmantown.

Cinq (5) essais aux tiges ont été effectués dont deux (2) en cours de forage

et trois (3) après la profondeur totale.

Le puits est coffré (177,8 mm â 1 489,42 mkb) et suspendu pour de futures

évaluations.

4 1~

1- PERMIS DE FORAGE

MINISn3RE DE L'ENERQIE ET DES RESSOURCES

8ectwr énergie, Direction de l'aménagement arwpecorpioraucn

. ~ Perrr7is de Forage de PUIS

SOQUIP, St F/aHen Ibto 9

91FA215

SOQUIP 1175 , rue de Lavigerie Sainte -Foy, Québec GIV 1P4

La ministre de l'Énergie et des Ressources autorise par la présente, SOQUIP

effectuer le forage d'un puits sur le bail d'exploitation de pétrole et de gaz naturel enregistré en son nom et portant le numéro 103.

Ce permis de forage de puits est délivré conformément à la Loi sur les mines, LR.Q., chapitre M-13.1.

Le détenteur de ce permis s'est acquitté avant délivrance de celui-ci de toutes les obligations prescrites à la section I, chapitre lU du règlement concernant le pétrole, le gaz naturel, la saumure et les réservoirs souterrains.

Le détenteur de ce permis devra en outre se conformer à toutes les obligations édictées par la Loi sur le mines ainsi qu'à toutes les conditions établies par règlement.

Le sous-ministre associé à l'Énergie

V' Jean Giroux, LLL

Charlesbourg, le 18 décembre 1991

II- INFORMATION$ GÉNÉRALES

Nom du puits SOQUIP ST-FLAVIEN NO 8

Foreuse RALEX NO 1

Opérateur SOQUIP

Contracteur RALEX

Permis Permis du Québec No 91FA215

Localisation UTM à déterminer

Latitude 46° 30' 20.3" N

Longitude : 71° 34' 57.6" 0

Élévation Sol + 136,70 m

Table de rotation (kb) : + 143,84 m

Profondeur totale 1 717 mkb

Début du forage 8 janvier 1992

Fin du forage 18 février 1992

Fin des travaux relatifs au forage 26 février 1992

Coffrage 244.5 mm à 300.50 mkb 177.8 mm à 1 489.42 mkb

Statut Suspendu

ENERCON ENGINEERING LTD. WELL DATA SUMMARY

WELL NAME: SOQUIP ST. FLAVIEN #8

LOCATION: ST. FLAVIEN #8

TOTAL DEPTH: 143.6 mXB Drlg Licence No.: 91FA215

ELEVATIONS: K.B. 143.55 m Ground 136.65 m

STATUS: Potential Gas Storage Well

SPUD: 13:00 hrs 92-01-08 RIG RELEASE: 08:00 hrs 92-02-25

HOLE SIZE: Surface: 311mm to 301 mKR Main: 222mm to 1717-mKB Intermediate: N/A

SURFACE CASING: 23 jts., 244.5mm, 48.0 kg/m, H-40, ST&C, 3 Rge, Ipsco (TOH: 301.34 m) Landed 300.77 m K.B.

CASING BOWL: 279.4mm x 244.5mm W.P.: 21,000 kPa Make/Type: Crown CC-22

PROD. CASING 116 jts., 177.8mm, 38.69 kg/m, LT&C, 3 Rge, Ipsco, N-80 (TOH: 1490.14 m) Landed 1489.42 m K.B.

CORES: Core #1: 1189m to 1192.85m Recovered: 3.25m (Interval) Formation: Quebec City

Core #2: 1192.85m to 1195m Recovered: 2.75m (Interval) Formation: Quebec City

Core #3: 1454m to 1457.3m Recovered: 3.5m (Interval) Formation: Beekmantown

Core #4: 1457.5m to 1463m Recovered: 5.5 m

(Interval) Formation: Beekmantown

Core #5: 1485m to 1496.25m Recovered: 10.25 in (Interval) Formation: Beekmantown

Core #6: 1514m to 1524.5m Recovered: 10.5 m (Interval) Formation: Dolomie A

Core #7: 1524.5m to 1535m Recovered: 10.5m

(Interval) Formation: Dolomie B

Core #8: 1535m to 1540m Recovered: 5.0m

(Interval) Formation: Dolomie B

Core #9: 1672m to 1674.25m Recovered: 2.75m

(Interval) Formation: Dolomie C

Core #10 1674m to 1687.2m Recovered: 12.5 m (Interval) Formation: Dolomie C

DRILLSTEM DST #1: 1479-1496m O.H. BH Conven. Zone: Beekmantown

TESTS: Rate/Recovery: 81m Drlg. Fluid, GTS

DST 12: 1514-1540 O.H. BH Conven. Zone: Dolomie B Rate/Recovery: 28m Drlg. Fluid. Very tight formation.

DST #3: 1669-1717 O.H. BH Conven. Zone: Dolomie C Rate/Recovery: 19m Drlg. Fluid.

SOQ8WDS1 . XI.,S 3/16/92

WELL DATA SUMMARY (cont'd)

DRILLSTEM TESTS:

DST #4: 1470-1490m O.H. Con. Strad. Zone: Beekmantown Rate/Recovery: 101m, 73mGas C. mud 28mWater C. mud, GTS

DST #5: 1430-1470m OH Con Strad. Zone: Beekmantown

Rate/Recovery: GTS

ELECTRIC LOGS: DIFL--AC-GR-XY CN-XDL-SL-XY CBIL-GR DLL-GR DIP METER FORMATION MULT-TESTER(RFT)

from from from from. from from

1715.9m to 300.50 1715.9m to 300.50 1715.9m to 1120 1711.8m to 1050 T.D. to 120 1680m to 769.9

mKB mKB mKB mKB mKB mKB

Plug No. 1 1505 - 1485 mKB Polished plug to 1490 mKB

Ralex Rig No.

Drilling: Wilf Krawchuk Geology: Claude Morin

Hole was directionally drilled from under surface casing to FTD to control natural deviation tendencies (to keep well vertical).

PLUG-BACK:

DRILLING CONTRACTOR:

WELLSITE REPRESENTATIVE: ADDITIONAL

INFO:

1

SOQ8WDS1.XLS 3/16/92

CD

0 1 H.

o

cz)

c=) 0

4

1

6 "

c.;

! CD.•

: r-

i

!

• "; •

• C.; ; !

7 1.7.-

CD CT. CD! CT., CD ,.... CD ...lTD CD

c:75, CD c'. CD CD CD CD0> 0

= CT, d- <...0 X) 0 C....) -.I- .-0 X.) 4-- —

J CI_ E

c_D

CDC

CD

CD CD

L_L-1

Vi 1111[1! F 1TII I TTTli 111 llllll 1 Fi TTTTli i11 ririt IT II ri1-111-1rTTTT1T11 I1 11 Ili MI 1! 1,11Tri TT1 ri CD

1ia1CMl RANG

s~

•! _.~ifi. mrtw{uca

L, O ;

Silos e'

. \~.

VFA

SIiG c.

tea 0

— E : 7-71----1L _.

c~F - a`

/, 4 ~ É ST-FLAVIEN 3 - >♦ ST-FLAVIEN 1

c~,~r '(71,---j ST- FLAVIEN 7

ST-FLAVIEN 2

'Et "ST-FLAVIEN 8

' a,?.nrO. Co u/il~n Fr r r'

~--

•kg- e~ —~- _

J ~

JOLY 2 • ST-FLAVIEN 4 - . " i ,

~~. Cl. ~ CEDRE 1

- •~oIyr.l~ _'

.>Parc g -

-313 -32

avicoie

u

JOLY 3

\ ✓_ 450 ---" -..

Sda

N' R Î

S.104, • .,- -~ - -~ - f -. -

/

/ \,,""

. _ • . " ✓ .. • .~ . ~

710 JOLY 1 fl — 7---

. .. . .... ... . . - ,p✓_ -

\ - c~ _ - \ _ f - 17,z,

( i

• ~4i-.9. . .

S+io / a'' 1 2 Kin f

ECHELLE REGION DE ST-FLAVIEN

CARTE DE LOCALISATION ~

~¢.

III- GÉOLOGIE

1- SOMMETS DES UNITÉS LITHOSTRATIGRAPHIQUES

UNITÉS LITHOSTRATIGRAPHIQUES

KB (m)

4

SOUS LE NIVEAU

DE LA MER

ÉPAISSEUR (m)

Quaternaire 7,20 +136,65 12,81

Klippe de la Chaudière 20,00 +123,84 40,00

Fm de Québec City ou Groupe de Laurier

60,00 +83,84 1 166,00

Groupe du Trenton 1 226,00 -1 082,16 84,00

Groupe du Chazy 1 310,00 -1 166,16 124,00

Groupe du Beekmantown 1 434,00 -1 290,16 283,00

Profondeur totale 1 717,00 -1 573,16 -

NOTE : Profondeur d'après le forage (aucune correction pour la déviation)

SOME' St-FEavien no 8

SOME' Stflavien no 3

-1091,04a

-1145,30e

-1268,07.

-1595,49a -16'7oa

• ----- - -- ----------------- --------------~ ..... ........

-------------------

~ 1-i---i1=1///--M

~---- i----- -------i i- ■

-- --- ----- ----------■ ---------- 1--i----ii-y w------i--- 1------i-i-•

.414/501150/45.4r .

+136,65a +123,$40 +831,840

Men de a an'

-1080,1D5.

-11645

1288,,31■

-1570,51■

Québec Gty ou

Gr. Lawler

Gr. Trenton

Gr. Chazy

Beekinantown

C0aar>0in

13ppi de Is Chudirr

------------------

-

2- CORRELATION

TYD NIVEAU DE LA MER SOMMAIRE

Fm de Mardi

3- CAROTTES

Roche couverture

Carotte no 1 : Carotte no 2 :

Carotte no 3 : Carotte no 4 :

1189,00 -1192,25 mkb 1192,25 -1195,00 mkb

Formation de Québec City

1454,00 - 1457,50 mkb 1457,50 -1463,00 mkb

Formation de Beekmantown

Réservoir "H" drilling break

Carotte no 5 : 1486,00 - 1496,50 mkb

Formation de Beekmantown

Réservoir Dolomie "B"

Carotte no 6 : Carotte no 7 : Carotte no 8 :

1514,00 - 1524,50 mkb 1524,50 - 1535,00 mkb 1535,00 - 1540,00 mkb

Formation de Beekmantown

Dolomie "13"

Carotte no 9 : Carotte no 10 :

1672,00 - 1674,70 mkb 1674,70 - 1687,02 mkb

Formation de Beekmantown

4- DIAGRAPHIES

Les diagraphies suivantes ont été prises :

Course no 1 : DIFL-AC-GR-XY Cal 1715.9 - 300.5 mkb

Course no 2 : CN-ZDL-SL-XY Cal 1715.9 - 300.5 mkb

Course no 3 : CBIL-GR 1715.9 -1130 mkb

Course no 4 : DLL-GR 1711.8 -1050 mkb

Course no 5 : Dipmeter-GR-CVL 1715.9 - 1120 mkb

Course no 6 : Formation Multi-Tester (RFT)*

* RFT (voir profondeur et résultats pages suivantes)

DIFL dual induction focused log

AC acoustique (sonic)

GR gamma ray

XY CAL diametreur â 2 patins

CN neutron compense (compensated neutron log)

GllL density log

SL spectralog

CBIL circumferential borehole imaging log

DLL dual laterolog

DIPMETER pendagemètre

CUL ciment volume log

RFT repeat formation tester

****4**************'****.*********ie ***.*********3*******aM********alk****alt**********.******

* FORMATION MULTI-TESTER PRESSURE TEST SUMMARY *

* *

alril ************alt*********.*********************** *

TRIP NO. : 1 * PROBE I.:. ' 28.45 MM PAD SECTION O.D. : 184.5 MM * P ,KER TYPE : SK9-70 PRETEST CHAMBER VOLUME : 5 CC *

*

* :E FILE TEST HYDRO- PRETEST * PRETEST INITIAL - - 10. NO. DEPTH STATIC FLOWING FLOW SHUT-IN *

PRESSURE PRESSURE TIME PRESSURE REMARKS * (DM) (KPA) OCPA) (SEC) (KPA) *

****ae.talker***ieatie**********0.0.0.00*********************************************** ***** .. *

***** ***** *

3 16800.0 18872.00 1577.00 3 0.00 OK-TIGHT * 4 16801.0 18830.00 0.00 0 0.00 NO SEAT *

3 5 16799.0 18837.00 1377.00 3 0.00 OK-TIGHT * 6 18802.0 18830.85 5996.00 3 6699.84 OK-SHUT IN PRESSURE * 7 16745.0 18741.00 11E4.00 3 0.00 OK-TIGHT *

6 9 15325.0 17200.00 0.00 0 0.00 NO SEAT * 7 10 15168.0 16980.00 795.00 3 0-.00 OK-TIGHT

11 15290.0 17162.42 2548.00 ~r` 3 8240.61 OK-SHUT IN PRESSURE 12 15320.0 17152.00 260.00: 3 0.00 OK-TIGHT *

10 13 15170.0 16966.00 0.00 2 0.00 NO SEAT 0 1. 14 15172.0 16980.00 532.00 3 0.00 OK-TIGHT i~ 1 17 14680.0 16454.00 0.00 0 0.00 . NO SEAT * 1.3 18 14672.0 16447.00 0.00 0 0.00 NO SEAT * 14 19 14681.0 16440.00 0.00 0 0.00 NO SEAT * 1 20 14325.0 16034.00 0.00 0 0.00 NO SEAT a

21 14324.0 16041.00 0.00 0 0.00 NO SEAT 0 :7 22 14327.0 16041.00 0.00 0 0.00 NO EAT ies

24 14680.0 16420.00 0 P 0 0.99 NO SEAT r 25 14682.0 16461.00 0.00 0 0.00 NU SEAT Ct

=n 26 14677.0 16463.00 0.00 0 0.00 NO SEAT ist ?1 27 14326.0 16061.00 0.00 0 0.00 NO SEAT *

28 14323.0 16261.00 0.00 0 0.00 NO SEAT * 31 12255.0 13776.77 5333.00 3 7469.76 OK-SHUT IN PRESSURE k

_4 34 10945.0 0.00 0.00 0 0.00 NOT ATTEMPTED * 17.3 35 10945.0 12285.00 0.00 0 0.00 NO SEAT ip

36 10940.0 12265.00 0.00 0 0.00 NO SEAT * 37 10818.0 12113.00 0.00 0 0.80 NO SEAT *

?8 38 10807.0 13106.00 0.00 0 0.00 NO SEAT i, _. 39 10734.0 108B.010 435.00 3 0.00 OK-TIGHT = 41 9763.0 10967.00 0.00 0 0.00 NO SEAT O __ 42 9765.0 10953.00 488.00 3 0.00 OK-TIGHT 22 43 9760.0 10939.70 1812.00 3 4335.90 OK-STILL BUILDING is

44 9245.0 10353.00 0.00 0 0.00 NO SEAT is 45 9250.0 10367.00 0.00 0 0.00 NO SEAT i~

3= 46 8571.0 9607.00 369.00 3 0.00 OK-TIGHT * 36 49 7954.0 3943.00 0.00 0 0.00 NO SEAT *

50 7955.0 8324.00 0.00 0 0.50 NO SEAT * 51 7953.0 8917.00 0.00 0 0.00 NO SEAT û

39 52 7655.0 8577.00 339.00 3 0.00 OK-TIGHT * 53 7657.0 8577.00 374.00 3 0.00 OK-TIGHT * 54 7660.0 B605.30 0.00 0 0.00 NO SEAT *

Ac, 55 7699.0 8225.00 326.00 3 0.00 OK--TIGHT *

C DATA:

DEPTH INITIAL SHUT-IN PRESSURE

16502.0 1290.0 12255.0 9760.0

6699.8 8240.6 7469.7 4335.9

:000.)

8000.0

9000.0

10000.0

11000.0

12000.0

13000.0

1a000.0

1E000.0

G

1E000.0

C 1 ÿ ,i.]O _ •~

2000.0 5600.0 9200.0 12300.0 INITIAL SHUT-IN PRESSURE

16400.0 20000.0

'_000.0

.,c000.0

C

7:1

9245.0 12353.0 9250.0 10367.0 871.0 9607.0 794.0 8943.0 7955.0 8924.0 7953.0 6917.0 7655.0 8577.0 7657.0 877.0 7680.0 863.0 7692.2 8825.0

9000.0

a

2000.0 5600.0 2200.0 1200.0 HYDROSTATIC PRESSURE

16400.0 20000.0

5- ESSAIS AUXTIGES

DST NO 1 : 1479 - 1496 mkb - Zone "H" - Beekmantown (coussin de fond)

DST NO 2 : 1514 - 1540 mkb - Dolomie "B" (coussin de fond)

DST NO 3 : 1669 - 1717 mkb - Dolomie "C" (coussin de fond)

DST NO 4 : 1470 - 1490 mkb - Dolomie "H" (coussins pneumatiques)

DST NO 5 : 1430 - 1470 mkb - Beekmantown (coussins pneumatiques)

Les résultats et interprétations préliminaires sont en Appendice 6.

ST-FLAVIEN NO 8

ESSAIS AUX TIGES RÉSUMÉ

DST #1

- 1479-1496 m - Zone "H" - Récupération = 81 m (boue de forage) - FSIP = 9122 kPa - G.S.T.

DST #2

- 1514-1540 m - Dolomie "B" - Récupération = 28 m (boue de forage) - FSIP = 5435 kPa - N.G.S.T.

DST #3

- 1669-1717 m - Dolomie "C" - Récupération = 19 m (boue de forage) - FSIP = 7280 kPa - N.G.S.T.

1 14

~

~

Z ~

D T#4

- 1470-1490 m - Zone "H" - Récupération = 101 m (boue & filtrat) - FSIP = 9326 kPa

G.S.T.

DST #5 7

- 1430-1470 m - Zone "P"

Récupération = 110 m (boue de forage) `x - FSIP = 8712 kPa

- G.S.T.

6- RELEVÉS DE DÉVIATIONS

(VOIR PAGES SUIVANTES)

sperry-sun DRILLING SERVICES

OF CANADA

COMPLETION PLAN FOR

SOQUIP ET AL ST-FLAVIEN NO. 8

WELL: SOQUIP ET AL ST-FLAVIEN NO. 8

L.S.D.: NO. 8

FIELD: ST-FLAVIEN

PROVINCE: QUEBEC

JOB NO.: DD-433

DATE:

L992 02 18

1406 - 5TH STREET NISKU, ALBERTA TOC 2G0 TELEPHONE (403) 955-7606

Page 1

OQU I P

MEASURED DEPTH

ANGLE DEG

DIRECTION DEG

SPERRY-SUN DRILLING SERVICES SURVEY DATA

VERTICAL LATITUDE DEPTH METRES

DEPARTURE METRES

06-FED-1992 15:O.7:58

VERTICAL DOG SECTION LEG

0.00 0.00 0.00 f_l,flt) 0.00 0.00 rŸ.t_irŸ 0.00 35.00 0.50 64.00 75.00 0.07 N 0.14 E 0.06 0.47 6.3.i)i) 0.50 10 6-.00 0.24 N 0.27 E 0."^ 0.67 91.00 1.10 348.00 91.t)(7 0.63 N 0.16 E 0.61 0.65

1t8.t7rŸ 2.t7t) -59.00 117.99 1.35 N 0.09 E 1.=4 1.05

146.00 2.t)tŸ 0.00 145.97 2.ti _ N 0.09 E 2'2 0.074 175.00 2.70 0.i)t) 174.94 _.52 N t).i_)9 E _.50 0.72 itl~.t)(7 2.4t') •351.0rŸ 202.52 4.76 N 0.01 W 4.74 t).54

t)i Ÿ 27.?. 00 2.70 -45.00 2_1.8~ , 6.01 N c_7.28 W 6.02 0.42 -5R.00 _.^0) -50.00 258.85 7.-t7 N 0.57 W 7.39 0.62

278.00 2.70 -44.00 2r'7.82 8.42 N 0.82 W 3.46 0.56 321.00 _ . 8t_) __9.60 320.74 10.94 N 1.65 W 11.0= 0.40 330.30 7.60 736.40 370.02 11.507 N 1.89 W 11.60 0.9.3 39.40 3.60 344.30 339.10 12.04 N 2.07 W 12.15 1.62 346.70 3.80 355.00 348.38 12.6-' N 2.17 W 12.74

35`'.901 4.20 0.80 357.56 13.27 N W 12.39 1.85 767.20 4.70 7.80 366.63 13.98 N 2.14 W 14.10 2.38 376.00 4.40 6.20 375.60 14.68 N 2.t)5 W 14.78 1.11 385.70 2.60 0.8n 385.28 15.35 N 2.01 W 15.45 2.7? -_94.9t) 2.60 757.40 394.47 15.86 N 2 . r7î W 15.97 ^.69

404.00 2.f)rl :51.70 402.56 16.24 N 2.05 W 16.25 2.75 413.50 1.80 346.30 412.05 16.55 N 2.11 W 16.66 0.81 r?2'.ilri 1.70 777.2n ~ 422.55 16.6: N 2.2~7. _ . '~' 16.94 0.98 •7_,1.8t7 442.60

1.50 1.20

322.90 =12.90)

431.34 442.14

17.04 N 17.24 N

2 . ±_ 2 W.._ . 4 y W {

17.16 .A I . i

1.5_ 0.37 J /

452.30 1.10 -7,66 '70 451.84 17.54 N W 17.43 1.61 461.807 1.10 7.01.10 461.34 17.42 N 2.82 W 17.`;7 t).69 470.90 1.10 299.80 470.44 17.51 N 2.97 W 17.67 0.08 4E30.40 1.60 701.40 479.92 17.62 N 3.17 W 17.80 1.58 409.80 1.Sî_7 294.40 499.77 _ .. 17.75 N _.41 w 17.94 0.9-

499.-0 2.00 294.60 4`'9.'2 17.33 N 73.70 W 18.i)9 0.64 508.50 2.70 ~ 795.70 506.02 18.04 N 4.04 W 18.i8 508.40 2,8i) 291.80 517.91 19.27 N 4.48 W 18.50 0.64 527.50 2.70 236.40 527 , tli_7 18.38 N 4.89 W 18.67 0.9- 576.60 2.60 27.70 536.08 13.46 N 5.30 W 16.78 1.72

54~.2iŸ 2.40 257.80 545.66 18.44 N

~ ..

5 1 W 18.78 2.46 555.40 2.4C) 240.90 554.87 18.7n N 6.07 W 12.68 2.7.0 564.60 2.7i) 2^~~~.4226.40 564.26 18.06 N 6.41 W 18.46 2.01 574.40 2.10 22tj.5ij 577.85 17.77 N 6.9 W 18.19 2.14 _;~ ~_.._,.. L,tr 1.20 267.40 582.95 17.64 N 6.89 W 16.t)8 5~.11

SPERRY-SUN DRILLING SERVICES SURVEY DATA

ECQUIP

06-FEB-1992

3

MEASURED DEPTH

ANGLE DEG

DIRECTION DEG

VERTICAL DEPTH

LATITUDE METRES

DEPARTURE METRES

15:03:5B

VERTICAL DOG SECTION LEG

593.00 2.20 339.70 592.44 17.81 N 7.06 W 18.25 6.3'- 602.20 2.90 359'00 601'63 18.21 N 7.12 W 18.65 3.58 ~11.70

2.50 19.6O 611.12 18.64 N 7.04 W 19.09 3'2.=

621.20 2.40 40.10 620'62 18.99 N 6.86 W 19.42 2.77 631'40 2.50 62.30 630.81 19.24 N 6.52 W 19.66 2.79

641.20 2.40 72.50 640.60 19.42 N 6.14 W 19.80 1.7- 650.70 2.40 28.00 650.09 19.49 N 5.75 W 19.84 2.04 659.90 2.40 103.50 659'28 19.45 N 5.37 W 19.77 2.11

t19.60 2.30 113.70 668'97 19.31 N 5.00 W 19.60 1.'95 c79.00 2.30 134.40 678.37 19.03 N 4.70 W 19.36 2.00

698'20 2.40 155'B0 687'56 18'78 N 4.49 W 19.04 2.B6 697.60 2.90 170.70 696.95 1B.37 N 4.37 W 13.42 2.70 707.30 3'30 181.20 706.63 17.84 N 4.34 W 18.1 0 2.14 717.00 3.80 188.10 716'32 17.25 N 4.39 W 17.51 2.03 726.50 3.60 203.40 725'80 16.66 N 4.55 W 16.93 3.17

735'80 2'20 211.70 735.08 16.20 N 4.79 W 16.49 2.92 745.30 1.90 239.30 744.57 15.92 N 5.05 W 16.23 4.49 754.90 1'9O 270.30 754.17 15.84 N 5-34 W 14.17 7.1- 764.40 2.50 298.20 763.66 15.94 N 5.69 W 1e,.29 3'B2 773.B0 2.80 303.20 773.05 16.16 N 6.05 W 16'54 1.21

783.20 2.90 310.40 782.44 16.44 N 6'43 W 16.85 1.19 792.80 2.90 319.60 792.03 16.79 N 6'77 W 17.21 1.45 802.60 2.70 315.70 801.82 17.14 N 7.09 W 17.59 0.B5 311.90 2.10 320.00 811.11 17.43 N 7'75 W 17'89 2.02 821.40 1.90 336'90 -620.60 I/./o N W 13.18 1.96

S31.00 2.00 352'B0 830.20 18.02 N 7'61 W 1B.50 1.71 B40.40 2.70 3.90 839.59 18.40 N 7.62 W 18.88 2.65 349.80 3.60 14.20 848.97 13.91 N 7.53 W 19.38 3.37 959.00 5.00 19.20 858.15 19.57 N 7.33 W 20.02 4.72 ~6B.10 5.~O 25.00 267.21 20.37 N 7.00 W 20.B0 3'48

23'00 876.65 21.29 N 4.59 W 21.69 1.4- 957.10 5.70 1B.20 826.10 22.21 N 6'24 W 22.59 2.47 ~96.60

5.30 14.40 875.56 22.09 N 5.98 W 23.44 1.71

9J6.00 4'40 3.70 904.92 23.37 N 5.85 W 24.21 4.06 715.60 4.70 4.90 914.49 24.63 N 5'79 W 24.97 0.9B

7L3'00 4.30 9.10 921.87 25.20 N 5.73 W 1'91 934.00 3.90 13.30 932.84 25.98 N 5.58 W 26.30 1.49

3.70 18.70 942.12 26.57 N 5.41 W 26.38 1'36 7.10 20'30 951.81 27.11 N 5.22 W 27.41 1.37 ~'50 13.00 91.19 27.54 N 5.07 W 1.95

SPERRY-SUN DRILLING SERVICES SURVEY DATA

;oCUIF-• O4-FLE~-1' 92_

MEASURED DEPTH

ANGLE DEG

DIRECTION DEG

VERTICAL DEPTH

LATITUDE METRES

DEPARTURE METRES

15:07:5.3

VERTICAL DOG SECTION LEG

971.40 1.30 ,0.'0 970.19 27.35 N 4.94 W ;3.1: 7.78 9P1.00 1.50 55.40 979.73 23.05 N 4.74 W 28.71 2.42 990.60 1.50 6i)..,i;) 989.72 78.19 N 4.55 W 2P.47 0,40

1000.-20 1. 7.E) 47.f)ii 998.98 -5.-6 N 4.•=4 W t8.52 26.52 11.81

1009.60 0.40 77.50 1(=)08.78 22.716 N 4.77 W 2)3.58 3.10

1019.10 [).5t) 371.40 1(:)17.82 23.42 N 4.72 W 22.65 1.5 102P.00 0.80 290.30 28.43 N 4.=0 W 28.71 1.81 1037.50 1.20 27=.10 1036.26 22.51 N 4.46 W 28.75 1,57 1047.20 1.50 260.40 1045.97 75.49 N 4.48 W 2P.75 1.71 1056.50 •]_ . : ~ i Y 240.00 1055.2E 2_.41 N 4.92 W 28.6.3 1,R0

•1066.10 1.5'=) .sry.-.10 7 fi 1064.37 78.77 N 5.14 W ÿO.54 1075.40 2.00 775.70 1074.16 28.1? N 5.tR W

22.42 1.6=

1034.60 7.50 27:7.50 - 1087.35 27.91 N 5.67 W 23.2: 1 1097. 70 7.00 232.90 1092.44 27.65 N 4.02 27.97 1.•~5

1102.30 7.00 277.90 110:i.57 . . =6 N 6.40 W 27.74 0.17

1112.00 2.40 224.70 1110.72 27.06 N 6.7_ W 27.48 1121.50 L.4(_) '(i4,8i) 1120.21 24.77 N 6.97 W 27.19 1.96 11'0.7;_) 1.70 194.20 1129.41 26.47 N 7.10 W 26.90 ~ .70 1140.20 1.^1j 135.40 1133.90 26.27 N 7.14 W 26.66 1.72 1149.70 0.90 178.20 1146.40 24.06 N 7.15 W ?6.49

1_53.7=' i).7(:) 17-.10 1157.40 75.94 N 7.15 W :6.T7 0.67 1168.10 0.40 214.90 1166.80 75.85 N 7.14 W :6.23 1.45 1179.00 (!.4(1 17,^~-_.5ii 1177.70 E5.73 N 7.18 W 24.21 (.'..3t)

11P7.20 1).îpi: 152.90 1185.90 75.77 N 7.16 W 26.16 (_`.50 1194. •6k=: (_) , ÿ (_) 147.30 1195.30 25.44 N 7.11 W .:::.6.UA 1.60

1206.20 15'0.il) 1204.90 25.48 N 7.02 W 25.91 0.95 1215.70 1225.00

1 , lJl_Î

. '_) 155.5Fl.•!- 154.20

1214.40 127'7.69

25.28 N 24.97 N

6.91 W 6.78 W

25.697W5'.3P

1.32 2.90

1_74.70 7.50 1,6.R.9,) 1277,38 24.5:7 N 4.61 W 74.R9 1243.90 4.2 _s 158.0U 1242.56 27.91 N W 24.70 2.62

_ 160.20 1252.27 6.16 W 0.7çF 160.70 1261.61 22.66 r 1 8.94 W 23.01

1277.40 - 1270.9Y 22.10 N 5.75 .1. 4ü 22.44 1.91 1230,17 21.61 N . ! W 5 i= 21.94 0.99

1291 .1 0 .7i 1239.66 21.11 N 5.>:b W 2.70

17:0f.10 143.10 1299.43 70.54 N 4.84 w 20.82 2.15 1710.60 4.7i,: 151.20 1309.10 19.9'0 N 4.44 W 20.16 -. 7'4

11,.80 _ . ..~ '•J 151.90 t310.27 19 ..,_.1 N 4 . i_)b W 19.45 1.32 172-9.50 154.10 1327.9: 1.3.45 N .3 w .1L.66 0,67 1378.40 , 0l.l 155.00 1336.G0 17.76 N W 17.95 0.43

SPERRY-SUN DRILLING SERVICES SURVEY DATA

CCS IE

1EASURED DEPTH

ANGLE DEG

DIRECTION DEG

VERTICAL DEPTH

LATITUDE METRES

DEPARTURE METRES

0a-FEB-19 92 15:»2;5a

VERTICAL DOG SECTION LEG

.1348.30 4.60 155.10 1746.66 17.02 N 3.00 W 17.18 0.91

1357.40 4.50 156.80 1355.73 16.36 N 2.71 W 16.50 0.55

1366.90 4.30 157.80 1335.21 15.68 N 2.42 W 15.81 0.13

1376.80 4.10 159.80 1375.08 15.01 N 2.16 W 15.12 0.75

1786.10 4.00 159.80 1384.36 14.39 N 1.94 W 14.49 0.32

1395.20 3.90 159.90 1373.44 ±3.80 N 1.72 W 13.89 0.33

1404.40 3.50 159.70 1402.61 13.22 N. 1.51 W 13.30 0.33 1414.10 3.40 159.80 1412.29 12.65 N 1.30 W 12.71 ±.24 1423.50 2.±0 159.90 1421.68 12.15 N 1.11 W 12.20 0,96 1445.20 2.80 ±61.10 1441.35 11.20 N 0.77 W 11.22 0.47

THE DOGLEG SEVERITY IS IN DEGREES EER 30 ME ZRES THE VERTICAL SECTION WAS COMPUTED ALONG 356.05°

BASED UPON MINIMUM CURVATURE TYPE CALCULATIONS. THE BOTTOM HOLE DISPLACEMENT IS 11.22 METRES IN THE DIRECTION OF 356.06° COORDINATE VALUES ARE GIVEN RELATIVE TO THE PLATFORM REFERENCE POINT VERTICAL SECTION IS GIVEN RELATIVE TO THE WELLHEAD LOCATION

0 5 -5 -15 -20 -10

~

SOQUIP ST-FLAVIEN NO. 8

West

SOQ8-DIR.XLS Chart 1 2/27/92

SOQUIP St-Flavien No.8 Progression latérale du puits (m)

(Vue de plan)

_

_

............._.._.._._.._....__._.....__..........___.

- ___.

-1214

....._..._.... . -1058 ~ -_.__...

.__...._._........._ ___....._.__--

_

_ -981

- -- -

-1291

-831 r4

_

_

~ .............

r —...

................

.....»_.......

........._ _..............~

.-._._..-.....

................_

,. -431

_..........

-

._.. .»..

..._.._ ......».........

..-...--........ ...

-s , -7V4

_.

J .._~.

~-.-..

{.~}. ! - ta

...- .....- ._

— __ ...

-144~

_..._. ..._......_._. .. _

I

-16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8

Prvfondoura en mKB PH/92-02-13

32

30

28

26

24

22

20

18

16

14

12

10

8

6

4

2

0

-2

SOQUIP St-Plavieri No.8 Progression latérale du puits

(Axe Est-Ouest)

Ouest Est

-200

P

t -400 rt d

• -600

• -800 t- 1

a —1000

é — 1200

rn -1400 K B

-1600

-1800 -30 -25 -20 -15 -10 -5 0 5

Progression (m)

PH/92-02-19

-800

000

Pulta Nord

SOQUIP St-Flavien No.8 Progression latérale du puits

(Projection verticale, axe Nord-Sud)

Sud

0

-200

P

• -400 f 0 n d e -600 it r

rn -1400 K B

-1600

-1800 ,

-5 0 5 10 15 20 25 30

PH/92-02-13

APPENDICES

APPENDICE 1 Rapports géologiques journaliers

APPENDICE 2 : Rapports de forage journaliers

APPENDICE 3 Description détaillée des retailles

APPENDICE 4 Description des carottes

APPENDICE 5 Strip log

APPENDICE 6 Représentation géologique du puits

APPENDICE 7 Résultats des essais aux tiges

APPENDICE 8 Diagramme du puits

APPENDICE 9 Programme de boues

APPENDICE 10 Liste des trépans

APPENDICE 11 Coffrage et cimentation

SOQUIP ST-FLAVIEN NO 8

RAPPORTS GÉOLOGIQUES

JOURNALIERS

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 DATE : 1992-02-18

HEURE : 08h00

PROFONDEUR : D E : 1697,0 mkb

 1717,0 mkb, (profondeur totale)

JOUR DE FORAGE : quarante-deux (42) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHOIDGIE

PROGRESSION : 20 m (fin du forage de St-Flavien no-8)

STATUT: enregistrement des diagraphies électriques

1687-1717 mkb

20-100 % dolomie blanche à gris très pâle â gris, rarement gris moyen ou verdâtre à rosé, microcristallin à cryptocristallin parfois d'aspect granulaire (texture sucrosique), légèrement argileux à argileux, calcaireux, présence de stylolites, trace de grès dolomitique, parfois pyriteux, (1705-1710 mkb, riche en bitume).

TR-75 % grès dolomitique (seulement à 1685-1690 mkb ), blanc à gris très pâle rarement bleuté, grains fins â moyens, tri moyen, sub-arrondis, ciment dolomitique, pyriteux.

TR-2,5 % calcaire, blanc à gris brun pâle, texture cryptocristalline à microcristalline, argileux, à l'occasion fossilifère, pyriteux,

TR-2,5 % shale noir, laminé, parfois pyriteux, peu à légèrement calcaireux.

Taux d'avancement; 1687-1717 mkb 13-20min-mètre généralement 18-20min-mètre

Indices de gaz; aucun

Gaz dans la boue; 1687-1717 mkb 80-110 unités

Description de la carotte no-10 (ci-jointe)

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 DATE : 1992-02-17

HEURE : 08h00

PROFONDEUR : QE : 1681,8 mkb

g 1697,0 mkb

JOUR DE FORAGE: quarante et un (41) GÉOLOGUE: Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHOLOGIE

PROQRESSION : 15,2 m

STATUT: poursuite du forage conventionnel pour environ 30 mètres et fin du puits

carotte no-10; 1674,70-1687,25 mètre course; 12,55 m récupération; 12,32 m pourcentage; 98,2 ROD; 89,4 %

Taux d'avancement; 1674,70-1675 mkb 066min-mètre carotte no-10 1675,00-1676 mkb 138min-mètre

1676,00-1677 mkb 201 min-mètre 1677,00-1678 mkb 107min-mètre 1678,00-1679 mkb 109min-mètre 1679,00-1680 mkb 132min-mètre 1680,00-1681 mkb 132min-mètre 1681,00-1682 mkb 136min-mètre 1682,00-1683 mkb 136min-mètre 1683,00-1684 mkb 128min-mètre 1684,00-1685 mkb 124min-mètre

1685,00-1686 mkb 136min-mètre 1686,00-1687 mkb 114min-mètre 1687-1687,25 mkb 029min-mètre

Gaz dans la boue; 1674,7-1687,25 mkb 80-120 unités

Indices de gaz;

1681,20 mkb 400 unités

Description de la carotte no-10 (à venir).

1687-1696 mkb

description à venir (" lag time ")

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 DATE : 1992-02-16

HEURE : 08h00

PROFONDEUR : : 1673,5 mkb

À 1681,8 mkb

JOUR DE FORAGE : quarante (40) GÉOLOGUE: Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 8,3 m

STATUT : poursuite du carottage, carotte no-10, dolomie "C"

carotte no-9; 1672-1674,70 mètre course; 2,70 m récupération; 2,68 m pourcentage; 99,3 % RQD; 94,8 %

Taux d'avancement;

1672-1673 mkb 52min-mètre carotte no-9

1673-1674 mkb 60min-mètre 1674-1674,7 mkb 66min-mètre

Gaz dans la boue;

1672-1674,7 mkb 80-140 unités

Description de la carotte no-9 (ci-jointe)

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQU1P ST-FLAVIEN NO 8 DATE : 1992-02-15

HEURE : 08h00

PROFONDEUR : : 1611,0 mkb

~ 1673,5 mkb

JOUR DE FORAGE : trente-neuf (39) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 62,5 m

STATUT: poursuite du carottage, carotte no-9, dolomie "C"

1611-1625 mkb

90-95 % calcaire brun à brun pâle, parfois gris brunâtre (15-35 %), cryptocristallin à microcristallin, d' allure d'un mudstone, argileux à très argileux, pyriteux, parfois légèrement dolomitique, à l'occasion observation de'.fossiles non-recristallisés (brachiopodes).

5-10 % shale brun foncé, laminé, parfois pyriteux, peu calcaireux.

1625-1665 mkb

97,5-100 % calcaire blanc à gris brun pâle, rarement brun, texture cryptocristalline à microcristalline, légèrement argileux, à l'occasion fossilifère, peu recristallisé, observation de brachiopodes, pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite, abondance par endroit de peltoides

TR-2,5 % shale brun foncé, laminé, parfois pyriteux, peu calcaireux.

1665-1672 mkb

65 % dolomie gris à gris bleuté, parfois gris plus foncé, argileux à très

35 %

TR

argileux, microcristalline à texture sucrosique, silteux à l'occasion, (dolosiltite), rarement grèseux, (dolorénite). calcaire blanc à gris brun pâle, rarement brun, texture cryptocristalline à microcristalline, légèrement argileux, â l'occasion fossilifère, peu recristallisé, observation de brachiopodes, pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite, abondance par endroit de peltoides shale brun foncé, laminé, parfois pyriteux, peu calcaireux.

Taux d'avancement: 1611-1625 mkb

08-12min-mètre 1625-1672 mkb

12-17min-mètre

Indices de gaz: 1640,25 mkb

475 unités

Gaz dans la boue: 1611-1672 mkb

80-130 unités

CAROTTE NO-9; dolomie "C", début à 1672 mkb

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 DATE: 1992-02-14

HEURE: 08h00

PROFONDEUR : LLE : 1540,0 mkb

g 1611,0 mkb

JOUR DE FORAGE: trente-huit (38) GÉOLQgUE: Claude Morin

FORMATION PRÉSUMÉE: Groupe de Beekmantown

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 71 m

STATUT : poursuite du forage conventionnel

1540-1585 mkb

20-100 % calcaire brun très pâle à brun pâle, texture sucrosique, peut-être légèrement argileux, à l'occasion fossilifère, mais complètement recristallisé, parfois un mudstone, présence de stylolite, légèrement dolomitique.

10-62,5 % dolomie blanche gris très pâle à gris bleuté, moyennement à finement cristalline, texture granulaire, peut-être légèrement argileux, homogène, à ciment parfois calcaireux, surtout silteux, (dolosiltite à dolorénite).

TR-5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

note: la dolomie disparait vers la profondeur de 1560 mkb.

1585-1610 mkb

92,5-97,5 % calcaire brun à brun pâle , parfois gris brunâtre (5 à 20 %), cryptocristallin â microcristallin, d' allure d'un mudstone, argileux à très argileux, pyriteux, parfois légèrement dolomitique, à l'occasion

observation de fossiles non-recristallisés (brachiopodes). 5-7,5 % shale brun foncé, laminé, parfois pyriteux, peu calcaireux.

Taux d'avancement: 1540-1585 mkb 15-20min-mètre 1585-161) mkb 07-10min-mètre

Indices de gaz: aucun

Gaz dans la boue: 1540-1610 mkb 70-150 unités

NOTE: à 1587 mkb, chancement du taux d'avancement qui correspond à un calcaire argileux à très argileux tel qu'observé sur le log sonic, résistivité et le gamma ray. Ceci est un bon marqueur pour calibré de nouveau la dolomie "C". La profondeur prévue de la dolomie C serait vers 1673-1677 mkb.

 venir: poursuite du forage et recherche du "core point",(dolomie C).

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE : SOQUIP ST-FLAVIEN NO 8 DATE : 1992-02-13

PROFONDEUR : D : 1538,2 mkb

A :

1540,0 mkb

HEURE : 08h00

JOUR DE FORAGE : trente-sept (37)) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHOLOGIE

PROGRESglON : 1,8 m

STATUT: trip in, poursuite du forage conventionnel

carotte no-8; 1535-1540 mètre course; 5 m récupération; 5 m pourcentage; 100 % RQD; 90,8 %

Taux d'avancement; carotte no-8

1535-1536 mkb 51 min-mètre 1536-1537 mkb 86min-mètre 1537-1538 mkb 102min-mètre 1538-1539 mkb 76min-mètre 1539-1540 mkb 138min-mètre

Gaz dans la boue;

1535-1540 mkb 80-140 unités

carotte no-8; "quick look", dolomie très calcaireuse, gris à gris foncé argileux à très argileux, litage peu defini, biotubé, quel-

ques niveaux à lithoclaste.

 venir; poursuite du forage,

description de la carotte no-7 et no-8, à venir, (applecore), résultat du DST, à venir,

page 2

DATE : 1992-02-12

HEURE: 08h00

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FOFI4GE : SOQUIP ST-FLAVIEN NO 8

PROFONDEIlR : p_E : 1524,5 mkb

A :

1538,2 mkb

JOUR DE FORAGE : trente-six (36) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHQLOGIE

PROGRESSION : 13,7 m

STATUT: poursuite du carottage, carotte no-8

carotte no-6; 1514-1524,5 mètre course; 10,5 m récupération; 10,24 m pourcentage; 97,5 % ROD; 85,1 % voir description de la carotte no-6 (ci-jointe)

carotte no-7 1524,5-1535,0 mètre course; 10,5 m récupération; 9,36 m pourcentage; 89 % RQD; 68,8

Taux d'avancement;

1524,5-1525 mkb 24min-mètre carotte no-7

1525,0-1526 mkb 39min-mètre

1526,0-1527 mkb 43min-mètre

1527,0-1528 mkb 45min-mètre

1528,0-1529 mkb 34min-mètre

1529,0-1530 mkb 43min-mètre

1530,0-1531 mkb 53min-mètre

1531,0-1532 mkb 54min-mètre

1532,0-1533 mkb 79min-mètre

1533,0-1534 mkb 52min-mètre

1534,0-1535 mkb 38min-mètre

 venir; récupération de la carotte no-8, et effectuer un DST.

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 DA : 1992-02-11

PRQFONDEUR: DE:

A :

1496,5 mkb

1524,5 mkb

HEURE: 08h00

JOUR DE FORAGE : trente-cinq (35) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHOLOGIE

PRO__ RESSION : 28 m

STATUT: trip, récupération de la carotte no-6

1496.6-1514 mkb

25-80 % dolomie blanche à gris pâle, rarement gris moyen, texture sucrosique, argileux, très silteuse à grèseuse,(dolosiltite à dolorénite), (très caractéristique), très argileux par endroit.

20-80 % calcaire blanc à gris brun clair, parfois brun pâle, très silteux, (calcilutite), texture microcristalline, parfois mudstone, fossilifère, forme ronde à ovale, recristallisé, légèrement dolomitique, argileux à très argileux.

TR-5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

carotte no-6 1514-1524,5 mkb course; 10,5 m à 8h00, la carotte n'était pas sortie du trou (récupération vers 9h00)

Taux d'avancement;

Gaz dans la boue;

1514-1515 mkb 55min-mètre 1515-1516 mkb 53min-mètre 1516-1517 mkb 48min-mètre 1517-1518 mkb 59min-mètre 1518-1519 mkb 52min-mètre 1519-1520 mkb 51 min-mètre 1520-1521 mkb 48min-mètre 1521-1522 mkb 37min-mètre 1522-1523 mkb 37min-mètre 1523-1524 mkb 45min-mètre 1524-1524,5 mkb 32min-mètre

1496,5-1514 mkb 30-100 unités 1514-1524,5 mkb 60-130 unités

À venir; récupération de la carotte no-6, (10,5 m)

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 DATE : 1992-02-10

HEUfiE : 08h00

PROFONDEUR : QEE : 1496,5 mkb

A : 1496,5 mkb

JOUR DE FORAGE : trente-quatre (34) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 0 m

STATUT : fin de l'alésage et poursuite du forage

DST de 1479 à 1496,5 mkb, résultat à venir, (shut-in pressure}.

à venir; forage d'environ de 20 mètres pour atteindre la zone réservoir équivalente de St-Flavien no-3

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE : SOQUIP ST-FLAVIEN NO 8

PROFONDEUR : DE : 1485,0 mkb

 : 1496,5 mkb

JOUR DE FQRAGE : trente-trois (33)

DATE : 1992-02-09

HEURE : 08h00

GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 11,5 m

1485-1486 mkb;

1486-1487 mkb 1487-1488 mkb 1488-1489 mkb 1489-1490 mkb 1490-1491 mkb 1491-1492 mkb 1492-1493 mkb 1493-1494 mkb 1494-1495 mkb 1495-1496 mkb

42min-mètre 66min-mètre 47min-mètre 59min-mètre 60min-mètre 51 min-mètre 52min-mètre 50min-mètre 46min-mètre 44min-mètre

STATUT:

carotte no-5 course; récupération ; RQD;

Taux d'avancement;

fin du carottage de la carotte no-5

forage conventionnel, 1 mètre et poursuite du "drilling break", de 1485 mkb, prise de carotte, no-5

1486-1496,5 mkb 10,5 mètre 100 97,6

1496- 96,5 mkb 27min-mètre

Gaz dans la boue 1486-1496,5 mkb 70-100 unités

à venir; DST dans la zone 1479 à 1496,5 mkb.

page 2

SOQUIP RAPPORT GÉOLOQIOVE JQURNALIER

FORAGE: SOQUIP ST FLAVIEN NO 8 DATE : 1992-02-08

HEURE : 08h00

PROFONDEUR : D E :

À :

1457,5 mkb

1485,0 mkb

JOUR DE FORAGE : trente-deux (32) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 27,5 m

STATUT : évacuer le gaz dans la boue, augmentation de la densité de la boue

carotte no-4 course; récupération; RQD;

Taux d'avancement;

Gaz dans la boue

1457,5-1463 mkb 5,5 mètre 100 % 88,9 %

1458-1459 mkb 1459-1460 mkb 1460-1461 mkb 1461-1462 mkb 1462-1463 mkb

1458-1463 mkb

68,9min-mètre 58,9min-mètre 67,8min-mètre 64,8mi n-mètre 63 ,5mi n-mètre

60-150 unités

1463-1485 mkb

30-80 %

20-70 %

dolomie blanche à gris verdâtre à bleuté, clair, finement cristalline, texture granuleuse, (sucrosique), silteux à gréseux, (dolosiltite à dolorénite), grains grossiers, sub-arrondis, tri bon, flottent dans la pâte, quartz translucides. calcaire blanc à blanc "os", brun pâle à brun moyen, localement fossilifère, cryptocristallin à microcristallin, légèrement dolomitique, (mudstone), présence de fossile à l'occasion, argileux à très argileux par endroit, parfois silteux, (calcilutite). calcaire brun foncé, dolomitique, parfois silteux, à des allures de shale très calcaireux à dolomitique. shale noir à brun foncé, peu ou pas calcaireux, laminé

TR-15 %

TR-5 %

Taux d'avancement;

Gaz dans la boue;

Indice de gaz;

1454-1484 mkb 12-17min-mètre 1484-1485 mkb 4,1min-mètre*

*"drilling break"

1454-1484 mkb 100-140 unités

1484-1485 mkb 1500 unités*

*fermeture du BOP, éruption de gaz,

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE : SOQUIP ST-FLAVIEN NO 8 agTF : 1992-02-07

HEURE: 081100

PROFONDEUR : p_E : 1403,0 mkb

À : 1457,5 mkb

JOUR DE FORAGE : trente-et un (31) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Groupe de Beekmantown

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 54,5 m

STATUT : préparation du tube carottier, prise de la carotte no-4

1405-1430 mkb

84-90 % : calcaire brun pâle à brun moyen à gris pâle à gris brunâtre, parfois brun foncé,(argileux à très argileux), cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, obvervation d'ostracodes, trace de bitume, parfois silteux à arénacé, (calcilutites à calcarénites), présence de stylolites.

5-15 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle, parfois silteux, (calcilutites).

1-5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé, parfois silteux, à l'occasion a des allures bitumineux, quelques surfaces lisses:

1430-1455 mkb

30-80 % dolomie blanche à gris verdâtre clair, finement cristalline, texture granuleuse, (sucrosique), silteux à grèseux, (dolosiltite à dolorénite), localement verdâtre, parfois oxydé, (couleur rouille très clair).

20-70 % calcaire blanc à blanc "os", légèrement brunâtre, localement

fossilifère, cryptocristallin è microcristallin, légèrement dolomitique, (mudstone).

toit des formations

TRENTON CHAZY BEEKMANTOWN

1260 mkb 1310 mkb 1434 mkb

CAROTTE NO-3 course; récupération; pourcentage; RQD;

1454-1457,5 mkb 3,5 m 3,1 m 89 % 51 %

Taux d'avancement;

Gaz dans la boue;

Taux d'avancement;

Indices de gaz;

Gaz dans la boue;

1454-1455 mkb 1455-1456 mkb 1456-1457 mkb 1457-1457,5 mkb

1454-1457,5 mkb

1403-1454 mkb

"drilling break"

1434 mkb

1403-1454 mkb

51 min-mètre 58min-mètre 60min-mètre

140min-mètre

130-150 unités

6-9min-mètre

4,6min-mètre

849 unités

90-180 unités

1434 mkb

page 2

29 75 — 50 --- 75 — 100

i 125 50 25 30

~ 40

45 • : r~ 50

~ MUD WT.

l

VII.

-- 10

L tPPtc.i>> ~ -. — 10-11'10.'1Q~I '10

40 • 0'-"'1 2G — 1 0200 20 iflal ~`I►~

f~

~-- S. Iq

50-150-240 20.400

LL.IAi (v L T.LhKY •

611C0.ic

t_sP1~v~rrv~ =y

F 4

4-

50 4

55

I ?00 2400

05

• to

- I'

25

— 10Di- 25'4 I 50- 175

45

50 U

550

v5

50 r-~

._15 4 ._. 10 l

Is 4 B-12 c ___

I I- 1 I 6 114"'. 2 4-3 Y

0

-- 26

30 D

S II

\ /mg

1

~~. • 45

t j

— 50

.4wr_~ _ yf>~ .

1C r ~

--t-,1010-11, -150 175

~ ---.a 2

f

i 1 MUD .1K7y •

gir VII. 1500 0300

03

I 15

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE : SOQUIP ST-FLAV I EN NO 8 DATE : 1992-02-06

HEURE : 08h00

PROFONDEUR : D€ : 1310,0 mkb

À : 1403,0 mkb

JOUR DE FORAGE: trente (30) GÉOLOGUE: Claude Morin

FORMATION PRÉSUMÉE : Groupe de Chazy

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 93 m

STATUT: poursuite du forage

1310-1403 mkb

65-95 % % : calcaire brun pâle à brun moyen à gris pâle à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, obvervation d'ostracodes, trace de bitume, parfois silteux à arénacé, (calcilutites à calcarénites), présence de stylolites.

5-30 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle, parfois silteux, (calcilutites).

1-5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé, parfois silteux, à l'occasion a des allures bitumineux, quelques surfaces lisses.

note; 1345-1365 mkb;le calcaire brun pâle passe de plus en plus à gris à gris brunâtre pour redevenir brun pâle à la profondeur 1370 mkb.

Taux d'avancement; 1310-1403 mkb 6-8min-mètre

Indices de gaz; 1354 mkb 1356 mkb

144 unités 278 unités

Gaz dans la boue; 1310-1353 mkb 30-75 unités 1353-1402 mkb 140-180 unités

A venir; observation du toit du Beekmantown, et progession

de 20 mètres et arrêt pour la prisse de la carotte no-3 dans la roche couverture, (cap rock).

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 D, ATE : 1992-02-05

HEURE : 08h00

PROFONDEUR : D ~, : 1237,0 mkb

À : 1310,0 mkb

JOUR DE FORAGE : vingt-neuf (29) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Formation Trenton / Chazy?

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 73 m

STATUT: trip, changement de trépan

1237-1255 mkb

77,5-90 % : shale noir à gris foncé, rarement gris moyen (peu à pas calcaireux), parfois brunâtre, calcaireux à très calcaireux, aspect lustré, parfois pyriteux, présence de stries, veinules de calcite, lustré, rayable, (1245-1250 mkb présence de graptolites).

2,5-20 % calcaire brun pâle, brun à brun foncé, argileux à légèrement argileux, microcristallin à cristallin moyen, parfois silteux, trace de bitumes.

TR 10 % calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, présence de fossiles, pyriteux.

TR-2,5 % calcaire brun à brun foncé, parfois brun pâle à gris clair, argileux à très argileux, microcristallin, parfois silteux, flottent dans la pâte, pyriteux à l'occasion, parfois cristallin moyen, trace de bitumes.

1255-1290 mkb

TR-55 % : shale noir à gris foncé, rarement gris moyen (peu à pas calcaireux), parfois brunâtre, calcaireux à très calcaireux, aspect lustré, parfois pyriteux, présence de stries, veinules de calcite, lustré, rayable.

TR-32,5 %

TR-70 %

TR-95 %

calcaire brun à brun foncé, parfois brun pâle à gris clair, argileux à très argileux, microcristallin, parfois silteux, flottent dans la pâte, pyriteux à l'occasion, parfois cristallin moyen, trace de bitume. calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, fossilifères (brachiopodes, briozoaires, fragments non-identifiés, spicules d'éponges??), parfois silteux, friable surtout la courleur blanche, pyriteux. calcaire gris moyen à foncé, légèrement brunâtre, argileux, finement cristallin, (sucrosique), fossilifères, dureté moyen, laminé par endroit, avec trace de bitumes, parfois arénacé, présence de stylolites.

1290-1310 mkb

20-50 %

40-80 %

shale gris à gris brunâtre, légèrement silteux, pyriteux, friable, peu calcaireux à calcaireux. calcaire gris moyervà foncé, légèrement brunâtre, argileux, finement cristallin, fossilifères, dureté moyenne, laminé par endroit, avec trace de bitumes.

Contact possible du Trenton, 1255 mkb Début du shale gris; 1290 mkb équivalent à 4240 mkb à

St-Flavien no-3 ?

Taux d'avancement;

Indices de gaz;

1237-1250 mkb 20-28min-mètre 1250-1290 mkb 04-10min-mètre* 1290-1310 mkb 15-22min-mètre

* ajout de poids sur le trépan

1246 mkb 300 unités

Gaz dans la boue; 1237-1310 mkb 45-150 unités*

* augmentation du poids de la boue

SOQUIP RAPPORT GEOLQGIOUE JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 DATE : 1992-02-04

HEURE : 08h00

PROFONDEUR : DE : 1195,0 mkb

À : 1237,0 mkb

JOUR DE FORAGE : vingt-huit (28) GÉOLOGUE: Claude Morin

FORMATION PRÉSUMÉE : Formation de Trenton?

RÉSUMÉ DE LA LITHOLOGIE

PROGRE$y$ION : 42 m

STATUT: poursuite du forage

1195-1225 mkb

50-99 % : shale noir à gris foncé, rarement gris moyen (peu à pas calcaireux), parfois brunâtre, calcaireux à très calcaireux, aspect lustré, parfois pyriteux, présence de stries, veinules de calcite, lustré, rayable, (1215-1220 mkb présence de graptolites.

1-35 % calcaire brun à brun foncé, parfois brun pâle à gris clair, argileux à très argileux, microcristallin, parfois silteux, flottent dans la pâte, pyriteux à l'occasion, parfois cristallin moyen, trace de bitume.

2 10 % calcaire brun pâle à chamois, légèrement argileux, très pyriteux, crypto à mocrocristallin, fantômes de fossiles (aiguille noir, forme rectangulaire).

2-5 % calcaire blanc à gris pâle, parfois brun clair, argileux,dureté moyenne, présence de fossiles, pyriteux.

TR-1 % calcite de fractures, blanc à brun pâle, trace de bitume, présence de silice.

1225-1235 mkb

40-55 % shale noir à gris foncé, rarement gris moyen (peu â pas calcaireux),

15-57,5 %

2,5-30

parfois brunâtre, calcaireux à très calcaireux, aspect lustré, parfois pyriteux, présence de stries, veinules de calcite, lustré, rayable. calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, présence de fossiles, pyriteux. calcaire brun à brun foncé, parfois brun pâle à gris clair, argileux à très argileux, microcristallin, parfois silteux, flottent dans la pâte, pyriteux à l'occasion, parfois cristallin moyen, trace de bitume.

Contact possible du Trenton, 1230 mkb

Taux d'avancement; 1195-1205 mkb 1205-1212 mkb 1212-1216 mkb 1216-1228 mkb 1228-1235 mkb

24- 36min-mètre 17-26min-mètre 27-37min-mètre 11-22m in-mètre 24-28min-mètre

573 unités Indices de gaz; 1226 mkb

Gaz dans la boue; 1195-1235 mkb 85-150 unités

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAG : SOQUIP ST-FLAVIEN NO 8 DATE : 1992-02-03

HEURE : 08h00

PROFONDEUR : ,D~ : 1189,0 mkb

À : 1195,0 mkb

JOUR DE FORAGE : vingt-sept (27) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Fm de Québec City

RÉSUMÉ DE LA LITHOLWIE

PROGRESSION : 6 m

STATUT: récupération de la carotte no-2.

carotte no-1 1189-1192,25 mkb course; 3,25 m récupération; 2,58 m pourcentage; 79 % RQD; 45 %

Taux d'avancement;

Gaz dans la boue;

1189-1190 mkb 70min-mètre

1190-1191 mkb 116min-mètre

1191-1192 mkb 120min-mètre

1192-1192,25 mkb 72min-mètre

1189-1192 mkb 60-150 unités

Carotte no-2 1192,25-1195,0 mkb course; 2,75 m récupération; 2,50.m

pourcentage; 91 % RQD; à venir

Taux d'avancement;

1192,25-1193,0 mkb 32min

1193,00-1194,0 mkb 54min-mètre

1194,00-1195,0 mkb 114min-mètre

Gaz dans la boue;

1192,25-1195,0 mkb 120-200 unités

Description de la carotte no-1 voir feuille jointe (sommaire)

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 DATE : 1992-02-02

HEURE : 08h00

PROFONDEUR : DE : 1189,0 mkb

À : 1189,0 mkb

,JOUR DE FORAGE : vingt-six (26) GÉOLOGUE: Claude Morin

FORMATION PRÉSUMÉE : Fm de Québec City

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 0 m

STATUT: trip, pose du tube carottier.

carotte no-1 à 1189 mkb: -9 mètres â faire -Formation de Québec City -shale gris foncé à noir, brunâtre calcaireux à très calcaireux

SOQUIP RAPPORT GÉOLOGIQUE ,JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 DATE : 1992-02-01

HEURE : 08h00

PROFONDEUR : 1126,0 mkb

À 1189,0 mkb

JOUR DE FORAGE : vingt-cinq (25)

FORMATION PRÉSUMÉE : Fm de Québec City

GÉOLOGUE : Claude Morin

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 63 m

STATUT: trip et alésage du puits pour la prise de carotte

1126-1165 mkb

72,5-96 % : shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, aspect lustré, parfois pyriteux, présence de stries, abondant par endroit (1155-1160 mkb), veinules de calcite, 1145-1150 mkb, abondance de shale gris moyen, lustré, calcaireux à peu calcaireux

2,5-25 %

TR-10

TR-2,5 %

calcaire brun à brun foncé, parfois brun pâle à gris clair, argileux à très argileux, microcristallin, parfois gréseux à silteux, grains moyens à fins, sub-arrondis à arrondis, flottent dans la pâte, pyriteux à l'occasion, parfois cristallin moyen, trace de bitume.

calcite de fractures, blanc, à brun pâle, trace de bitume, présence de silice. calcaire brun pâle à chamois, parfois blanc à brun foncé, légèrement argileux, très pyriteux, crypto â mocrocristallin, fantômes de fossiles (aiguille noir, forme rectangulaire).

1165-1189 mkb

44-72,5 % shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, aspect lustré, parfois pyriteux, présence de stries, abondant par endroit

25-50 % calcaire brun pâle à gris brunâtre, parfois brun, argileux à légèrement argileux, microcristallin, présence de stylolites, parfois d'allure moucheté noir, présence de fossiles, parfois silteux à grèseux,pyriteux, présence de noduirs noirs de taille moyenne (1 mm), ou d'oolites,ou de pisolites ou même de pellets?, croute de couleur noir avec l'intérieur brun jaunâtre comme pyriteux, forme concentrique avec un noyau noir, parfois gris

TR-7,5 % calcaire brun pâle à chamois, parfois blanc à brun foncé, légèrement argileux, très pyriteux, crypto à mocrocristallin, fantômes de fossiles (aiguille noir, forme rectangulaire)

TR-2,5 % calcite de fractures, blanc à brun pâle, trace de bitume, présence de silice.

Carotte no-1 toit à 1189 mkb,car localisation du marqueur; calcaire brun pâle à 1170 mkb avec un jeu de 1 mètre

Taux d'avancement; 1126-1168 mkb 9-26min-mètre* 1168-1189 mkb 18-24min-mètre*

*variable en fonction de l'ajout de la table de rotation lors du forage.

"drilling break"; 1167 mkb 7,5min-mètre

Indices de gaz; 1151 mkb 202 unités 1167 mkb 190 unités

Gaz dans la boue; 1126-1189 mkb 35-100 unités

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQUIP ST FLAVIEN NO 8 DATE : 1992-01-31

HEURE: 08h00

PROFONDEUR : D E : 1075,0 mkb

À : 1126,0 mkb

JOUR DE FORAGE : vingt-quatre (24)

FORMATION PRÉSUMÉE : Fm de Québec City

GÉOLOGUE: Claude Morin

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 51 m

STATUT: poursuite du forage

1075-1125 mkb

72,5-90 % : shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, aspect lustré, parfois pyriteux, présence de stries, abondant par endroit.

7,5-20

TR-1 %

calcaire brun à brun foncé, parfois brun pâle à gris clair, argileux à très argileux, microcristaliin, parfois grèseux à silteux, grains moyens à fins, sub-arrondis à arrondis, flottent dans la pâte, pyriteux à l'occasion, parfois cristallin moyen.

grès blanc à gris pâle, parfois brun pâle, grains moyens, sub-arrondis à arrondis, tri .moyen , calcaireux à très calcaireux, argileux à l'occasion.

1-10 % calcite de fractures, blanc à brun pâle, trace de bitume, présence de silice.

NOTE; présence da calcaire sucrosique à l'occasion, argileux, microcristaliin.

Taux d'avancement; 1075-1078 mkb 38-54min-mètre

1078-1126 mkb 9-22min-mètre"

*variable en fonction de l'ajout de la table de rotation lors du forage.

moyenne; 12-18min-mètre

Indices de gaz; 1083 mkb 1088 mkb 1094 mkb

388 unités 231 unités 319 unités

Gaz dans la boue;

1075-1077 mkb hors d'usage 1077-1109 mkb 60.120 unités 1109-1125 mkb hors d'usage

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE : SOQUIP ST-FLAVIEN NO 8 DATE : 1992-01-30

HEURE: 08h00

PROFONDEUR : 121 : 1035,0 mkb

À : 1075,0 mkb

JOUR DE FORAGE : vingt-trois (23) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Fm de Québec City

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 40 m

STATUT : trip-vérification du MWD et du "mud motor"

1035-1075 mkb

74-100 % : shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, aspect lustré, parfois pyriteux, présence de stries à l'occasion, abondant vers 1060-70 mkb.

TR-15 %

TR-7,5%

calcaire brun à brun foncé, parfois brun pâle à gris clair, argileux à très argileux, microcristallin, parfois gréseux à silteux, grains moyens â fins, sub-arrondis â arrondis, flottent dans la pâte, pyriteux à l'occasion.

grés blanc à gris pâle, parfois brun pâle, grains moyens, sub-arrondis à arrondis, tri moyen , calcaireux à très calcaireux, argileux à l'occasion.

TR-5% calcite de fractures, blanc à brun pâle, trace de bitume, présence de silice.

NOTE; 1055-1070 mkb

.TR-1 % calcaire? ou dolomie? brun pâle â brun clair, argileux, texture sucrosique (microcristallin), parfois silteux, réagit peu au HCL, dolomitique?

Taux d'avancement; 1035-1075 mkb 4-33min-mètre*

*variable en fonction de l'ajout de la table de rotation lors du forage.

moyenne; 12-18min-mètre

Indices de gaz; aucun

Gaz dans la boue; 1035-1075 mkb 75-150 unités

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE: SOQUIP ST-FLAVIEN NO 8 DATE : 1992-01-29

HEURE : 08h00

PROFONDEUR : : 950,0 mkb

À : 1035,0 mkb

JOUR DE FORAGE : vingt-deux (22) GÉOLOGUE: Claude Morin

FORMATION PRÉSUMÉE : Fm de Québec City

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 85 m

STATUT : trip, (tige brisée--"washout")

950-1035 mkb

65-100 % : shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, aspect lustré, parfois pyriteux, présence de stries à l'occasion,

TR-30 % calcaire brun à brun foncé, parfois brun pâle, argileux à très argileux, microcristallin, parfois gréseux à silteux, grains moyens à fins, flottent dans la pâte.

0-5% grès brun clair à brun, grains moyens, sub-arrondis à arrondis, tri moyen à pauvre, calcaireux à très calcaireux, argileux à l'occasion,

TR-7,5% calcite de fractures, blanc à brun pâle, trace de bitume; présence de silice.

Taux d'avancement; 950-1035 mkb 4-25min-mètre*

*variable en fonction de l'ajout de la table de rotation lors du forage.

Indices de gaz; 972 mkb 1007 mkb 1022 mkb 1023 mkb

445 unités 337 unités 431 unités 719 unités C.G.

Gaz dans la boue; 950-1035 mkb 75-150 unités

page 2

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE : SOQUIP ST-FLAVIEN N08 DATE : 1992-01-28

HEURE : 08h00

PRQFONDEUR : D E : 937,0 mkb

À : 950,0 mkb

JOUR DE FORAGE : vingt-et-un (21) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Fm de Québec City

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 13 m

STATUT, : poursuite du forage

937-950 mkb

92,5 % : Shale gris foncé à noir, parfois striés, aspect lustré, calcaireux à très calcaireux,

Calcaire brun à brun foncé, microcristallin, gréseux, grains moyens à fins, sub-arrondis à arrondis, flottent dans la pâte

2,5 % : Calcite de fractures, blanc, trace de bitume

Taux d'avancement; 937-950 mkb 12-16min-metre

Indices de gaz; aucun

Gaz dans la boue; 937-939 mkb 35-40 unités 939-944 mkb hors d'usage 944-950 mkb 50-70 unités

5%

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE : SOQUIP ST-FLAVIEN NO 8 aga: 1992-01-27

HEURE : 08h00

PROFONDEUR : DE : 933,0 mkb

À 937,0 mkb

JOUR DE FORAGE : vingtième (20) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Fm de Québec City

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 4 m

STATUT : alésage du puits

933-937 mkb :

90 % : Shale gris foncé à noir,(calcaireux),brunâtre, (très calcaireux).

10%: Calcaire brun à brun foncé,argileux à très argileux, parfois gréseux à silteux.

TR: Calcite de fractures,blanc.

Taux d'avancement; 939-937 mkb 20min-metre

Indices de gaz;

Gaz dans la boue; 933-937 mkb 270-320 unités

SOQUIP RAPPORT GÉOLOGIQUE JOURNALIER

FORAGE : SOQUIP ST-FLAVIEN NO 8 DATE : 1992-01-26

HEURE : 08h00

PROFONDEUR : : 868,0 mkb

À : 933,0 mkb

JOUR DE FORAGE : dix-neuvième (19) GÉOLOGUE : Claude Morin

FORMATION PRÉSUMÉE : Fm de Québec City

RÉSUMÉ DE LA LITHOLOGIE

PROGRESSION : 93 m

STATUT: poursuite du forage

86$-930 mkb

60-100 % : Shale gris foncé à noir,(calcaireux), brunâtre, (très calcaireux),grande proportion de shale noir, (880-910 mkb)-(peu calcaireux),d'allure du shale d'Utica, striés, aspect lustré, pyriteux par endràit, petites veinules de calcite.

1-35 % : Calcaire brun à brun foncé, argileux à très argileux, microcristallin, silteux à gréseux par endroit, (gréseux-grains moyens, sub-arrondis, grains flottent dans la matrice ).

TR-20 % : Calcite de fractures, blanc à brun clair, présence de silice, trace de bitume.

TR-1 % : Grès blanc à brun clair, grains moyens, sub-arrondis, tri bon à moyen, quartz translucides, très calcaireux, pyriteux par endroit.

NOTE: 865-870 mkb; calcaire gris pâle à gris clair, texture sucrosique, argileux, petites impurtés de couleur brun foncé, première apparition

de ce calcaire ( très différent des autres calcaires rencontrés jusqu'à maintenant )

Taux d'avancement; 868-939 mkb 12-30min-metre généralement; 20-25min-mètre

Indices de gaz; 870 mkb 480 unités 874 mkb 2907 " C.G, 885 mkb 407 " 896 mkb 407 " 905 mkb 464 "

Gaz dans la boue; 868-933 mkb 100-200 unités

page 2

DATE FORAGE 1992-01-25

(0800 NRS)

SOQUIP ST-FLRUIEN NO 8

JOUR DE FORAGE dix-huitième (18)

PROFONDEUR DE

A

775,0 mkb

868,0 mkb

GEOLOGUE

CLRUDE MORIN (GéONIROM

Formation présumée; Fm de Québec City

LITHOLOGIE RESUMEE

Progression; 93m

Statut; poursuite du forage

775-868 mkb;

55-95% shale gris foncé à noir, (calcaireux), souuent brunâtre (très calcaireux), parfois striés, as-lustré, pyriteux,

TR-15% calcite de fractures, couleur blanche, pré-sence de la silice, trace de bitume,

5-25% calcaire brun clair à brun foncé, généralement Miteux rà gréseux, argileux à très argileux, microcristallin,pyriteux par endroit

TR-35% grès blanc à brun clair, grains moyens, sub arrondis,tri moyen à bon, quartz translucides

INDICES ET ESSAIS

gaz dans la boue;

DATE FORAGE 1992-01-25

(0800 HIM

SOQUIP ST-FLAUIEN NO 8

A

775,0 mkb

868,0 mkb PROFONDEUR DE

JOUR DE FORAGE diu-buitième (18)

indices de gaz; 785 mkb 828 mkb

824 unités 207 unités

GEOLOGUE CLAUDE MOR1N (6é0NIROM

Formation présumée; Fm de Québec City

LITHOLOGIE RESUMEE

très calcaireun,pyriteuu,

Taux d'auoncement; très uariable 809 mkb

819, 826, 828 mkb 829, 841, 846 mkb

6-32min/metre 49min/metre 4min/metre 4min/metre

775-785 mkb 450-500 unités INDICES ET ESSAIS 785-792 mkb 500-600 unités gaz dans la boue; 792-803 mkb hors d'usage

803-828 mkb 30-100 unités

SO QUIP G

FORAGE SOQUIP ST-FLRUIEN NO 8 DATE 1992-01-25

(0800 HRS)

PROFONDEUR DE

A

775,0 mkb

868,0 mkb

JOUR DE FORAGE dix-huitième (18)

GEOLOGUE

CLRUDE MOR I N (6é0N I ROM

Formation présumée; Fm de Québec City

LITHOLOGIE RESUMEE

INDICES ET ESSAIS

gaz dans la boue;

828-853 mkb 200-300 unités 853-868 mkb hors d'usage

re^insr-•r I tl1\I"1t.JL

SOOUIP ST-FLAIIIflw! NO 8 LJfiÎ t i 99:1-112: I _~A ■ s. Y a~ ■

2 .........~<{:, :.:~. ..,_ .....,_. ~F.\,.... :.v,... .. ..._ . ....... ...._ .._.

tÜifÛÛ Hli~1

673,0 mkb

Z~OC n bfa ■ M V MSS OUP

uJK ~ a ~~

i-~ tit eEitiee l i (j

nriflrflL Ir1rl 11"i 1"1r 1 I1ti1 VIYiJLVi! VL

1ft1 Irl r1r rrtinil"`r UV4~Ii LJL I til11ly~~L

Formation arésumée: i-m de Ouébec 41t1i

13 ï ri4JLV Git t[tStJMtt

t~Ft )I t it-~t1F

AiintG J►~inniJd dcranllJinnluia .. . .._... zv. v........ .,I I ~

I I II I I I II

*sr ôr r o/a«iEraEEaa■ as us ifafE■u I a ■ +-.a +..~Es.•aaa a.YEE,,asa a aa..sau~ ~

1 a i

ÎTaus tl'anancementr

7Li5 mfrh Smïn iinptrp•

769 mkb 4,8mindmetre

* "drilling break" (zone de fractures)

~

i

indices de gaz; 765 mkb 867 unités 769,5

~rn~ =s = 09,~ iiikU LJQ ( ufi~3C~

INDICES CT CJSa9■ J 15. -116% k I 1111-.7nan iiitiMtpl~

76i6-7641 Ilnilh 700-Ann unitise ill dans 1$ bane; 769-775 mkb 350-500 unités

• In=

rllrl~e"~r l Vl1l14.iL

rnniila CT-El On/ rid un O .i1a1e1Iai TN II ■ a_aiMir ■ ft- .1 •71a Y

599,0 mkt; ^E

rlrsr-tirr-n Ir1r1 If1 I Ii4J1 'LA MIL" LWit

C-ex n arm.4 i. III ■ .J,n III rlli

A

~_.~ sl~icïé111e ~ 1 v~ IF1I Irlt rtr rf'16i>i /"` r

ai4}'LP IL L/â. I 4J111111.7L

ri Anln[

Formation nrésumée: Fun de ûuéôec 1~iïu

I nnr3-1/111_7, 7t

• Ar s. Y • L.I I

I

i (0$00 NHS)

/ ...~ ~ ~ `r~1r.e rl{~ !f/f ■ 1_ ~

~ L ir f L r r ~ ~ ~~ ~~ L.~ f

,..........+~lr..;.....

%tiltllt=n,Iuurcalita duifaarsann ~ 1....,.. ,_... ~... ._,.. .. ,.~,..

iislkir• J I J WV IN 'Jr *UM Ra,

70-1117 a+isaias aRri ar Ewa ms ô as r ira•oia•oi rases sot orsilssasink* ■ !! .F ■ ,J N.17.■■VR 7.r 9i Rd 1WI. RiLL V lR RIP ■i, Ma 4, 4L/Rj, alai ail RF IL" ■lII.

hreinÿtrn (tray vÿErÿlramiyav)i rarfniv wtriôv, nv-

laactro rialritnalLli heaRaa`n11aa (In ~an~~i~1n tin r~1- ., .r . - ~ Y al . ,~.~ .f1 . f+ .... ...f[ i. IV MAW LP

cite et silice, 610-620 mkb dégozernent sur rlartsafiic rntsaâlInc a ar. ti.....,. . ~r ...a..1.a.r,

1r ni roaa•éias aias froa.tarraso a•asisaassar ésianaOrsas rsris- a aa a_ar N araael.sa.IL. iRL MA Ld, arlaiiaLaal ILO ■ ill■lirllL, i1■ L

cnnv,ia a!n Iÿ r:1:rn tr~rn sin hi-Inman 61 ~-f.~i1 , ~ .r, !Orb -7nrrn ïntanvâmant partuarhôn}

1-~ ~~ r~sa~rniral hrs~n a-~siir ~r hratin fv►~vô lssaniy . , Ra rf ti. eat nun si nrascause wrilaiu si traiç rnilaRi~si

3- - - - -- } - .aw- u i#~ ~ _ _ s

nairrna•rietiilliii

wrn a C~ i./,<.... ` i.,r.... i.~:r, Ra ■ Ri L,.J no ûrG,j v111I114 +i R■ a 11111 t.iflii , ~r âaiiaô 111Ô~Gl1â, suss

ssrras ors aià ,o tri irsrsli ai Ar as rr Isss aafai7 ~ra,ssarissa•iaia~ s swim vRiaa ■ d fL ■ a ailViiLR■ as UM "UP VO Ma ii {.a Y Off -0l ■ ia4R MilLJ

I-------- ■fLlfrl■!'~rr~

"ET rrri■r

IIVI.JIt_rt3 t! EJ3tl1J

as a& o ors a.• Lo 6assras• aJRia_ vta■R-if All 1a RFY1iL,

~ I I I L1éiiVLVG1t T'4tJlJlYltt I I I Prnnre~~clnn' 14 m I .

I

~ I I I I I I I I I I I

L

W▪ M r's' if f f l 1 MOW ~r If f IMO fk-e L If o--

R ... . ..... .. ... ... '} .... \ ...,_,.._

PROFONDEUR DE

A

I In rtr r°r3nar-r aJtiFV~i

IL" L- I LPl3rSN31.-

599,0 rntcû

ACi"Zv iii~ ~sC , û

! ~ ~ : ,`

stiiLiCüiti i n}

R~7rR M L ll-;1. .11-

r I ni1nr N~nn 11W1 ii;nnl►11 it niu/ ~ ..~..vv~ . ._..._

Formation nrésurnée: f m de ûuéûec CM.

!!Î!`1GLVGkt PftSVlVltt

r imc. r1Mir•oirrrr/Er, ors rrritirrrr■ Ira at "swab irmair imam a.:rm atrr ra— t E LJ 411.r4Y.■ 4 LIMN ,irlr. ■ iALrAl1.E,....tl! Y ■ MA EMI ■r4 v~e ...711.111 0/#

.mamr#r*Em# E.~ar '~•!! ,l

iYVr RLr■ AA ir1lE'41►

-faux d-anancement: 599-673 into Uü- i am ill~ meïfe

indices pie gaz; 611 mkb 29 iinitdis

41114•XIM:404~..644,1,14.4.4.6,40040100,4K+...., •

~nniiiii ST-Ci niiiC\i rin O +.' V ïV . ■ J ■ ■ ._•EEl..L...7 ■ ~V V

SIT) œn - 1 f/ i V E iJ

rr-1.nar f 1 Vl1f1L7L.

U~RI t

(11000 MRS)

INDICES Er: ESSAIS #

I~~urt,C3 €: =33~i13 $Û- i 56 unités 599-620 mKD i

s .. —/F a„Raa io i.l...r. - 30-i id unites 6Lü-6 r3 milt 2 R~Y~f R I R...• d E . 1R 11V L! ALE i

I I

IMO r' ' f fie 11 ~ f

If f f fi ~'' ~

Mon~ ~i., f 1-x 1-,.% J ~e NMI

I ~ ~

1 O^tAGE ennui D CT-C11 1r111 r11 u9 O .l a LE .! ■ 111.-M011,\L1111 Ewv 1.992-01- 22

Îl181111 IIu i

nnr3rrtia Ir1rl In 1 ItLlf LlIYLJI_iJlt

r~r LJ L

599,0 mkt,

IC a a 77,V fill 11111

I~til II'r rtir Vennir" +1ZJVIk LJL I \_ltwll~.?I_

. UU1iILli'NII' 11i

t-i-t

vs Aiinr Mrlf1il16d dcônwiiltllWy ........ . ...... ;v..~._...~. .r1

Formation présumée; Fm de Québec Citu

Ll i t'1LJLiJGtt 1`LCSVfy7tt

PlCnlllf P_+JCsin1l' r n ... v ■/ ■

wtatita f.aa siâ curia trial ia t~readmit-tin!! du .9""2 _

~.~ "rrrsid mntar" at nnsrrarrita du farsraa ...y~ ..._ ... r......,.w.... ,.~ ..~~.

.a.."~.i-+rr ~• rrra.r IIYLJI~.LJ C 1 LJJtLJ

as ca alone 10 lratiaaas• no, a.s•.o ■ \a IMF MP

FORAGE SOQUIP ST-FEAUIEN NO 8

i DE

A

525,0 mkb

599,0 mkb PROFONDEUR

quatorze (14) sr-il In r-tir• re—ant f r- r a!~ liJlt LlL 1 LJliJ1LL

(0800 1111S)

SOUUIP G`

Formation présumée; Fui de Québec Citg

C~FFIt [-]ii=t!!F li

L'AUDE MORIN (6é0N1ROM1 _ __ --- ------- ~

L11HHOLOGIE RESUMEE

Progression; 74 m

Statut; Trip

495-505 ekü. 526 -570 mkb et 580-595 mkb;

87,5% 997.

z..iC ,.l IL? J

shale gris foncé il noir, (calculreuu). suturent brunâtre (très calcaireuu), parfais striés, aspect lustré â l'occasion cd/cuire brun clni u manie brunâtre pare, pal r tris g

pp

rèR

s■

eun,, argileua,microcristallin, calcite RW N~ fr Rr1Lu! it~i .i► , Lrl y/. .44.i t!!7/.i4 4, ri de• ai L4ar Yae

r.■ .■ r.

grès blanc à gris pèle, parfois pqriteun

65% calcaire blanc é gris brun pèle, parfois tiré -seun, plusieurs trace de bitumes, textu -

rnrrectinn,rap_ 0 5) INDICES ET ESSAIS

gaz dans la boue;

a

Ll i FiIJLCJG1t t4tJtJMtt

~ 1

FORAGE SOQUIP ST-FEAIIIEN NO 0 DATE 1992-01-21

(01100 ORS)

PROFONDEUR DE

A

JOUR DE FORAGE

525,0 mkb

599,0 mkb

quatorze (14)

i1

(-~F0t OC4tJF

CLIME MORIN )6éONIROM

Formation présumée; Fm de Québec City

re cristalline moyenne é grossière, semble re cristal-

lisé :15. shale IUEMÂ

7 nL nrés I111FM1_ très caltairenu

570-575 mkb;

55% shale (IDEM) ~tl'e, grains mogens é gros- .....

Biers, arrondis, tri bon é moyen, ciment calcaireux, pyrIteus,

ricaire (MEW

4n7 ,~.-~~bl~o~~ -.- ner:e Tim .,.

~ Taux d°auancement_ 525-599 mkb 86-17minlmetre

~ ~ ~ ~

indices de gaz; 559 mkb 552 unutés

1 INDICES ET ESSAIS

~

s{aL ail urma ■ ma •YSY ail IL. , 200-300 unités-525 é 599 mkb

DATE TOPAGE 1992-01-20 SOQUIP ST-FLBUIEN NO 8

SOCUIP: ky'r3p •L•~i4 Lo-~4i!•'r~~/ AYL -

%VY -. Yrt ~' • .,.vYt S.^:Y"rY ftM .~.l.~/ll -0'.•~95fM1+M~✓~M,FM4~^MNMé?t' ^H 4,

... . ... . .

(0800 1185)

403,0 mkb

~

~_~. lr CiziCiliC R ! J)

JOUR DE FORAGE

PROFONDEUR DE

A 525,0 mkb

GLULOGUE CLRUOE MOIIIhI (6é0NIROM

i

Formation présumée; Fm de Québec Citg

LITHOLOGIE RESUMES

IProgression; 122 M

1 Statut; poursuite du forage

1 403,0 mkb-525,0 mkb;

759 A 100% shale gris foncé â noir, (calcaireuu(, souuent brunatre (très calcaireuii) par fais striés et iustr és, rarement avec une surface lisse de couleur noire (plan de glissement- croute de 0,5 mm-comme cuit)

I TR é 20% calcite de fractures, blanche à brunétre,chamois clair, cristallin mayen b grossier, plusieurs impurtés naires,rIi'uage de la calcite hien defini, trace de hi-tumes,parfois présence de la silice (translucide,

I ifs é i fi x, grés niant ii brun clair, parfois brun foncé, grains trés fins é mimeos, sub-arrondis é arrondis, mal triés, quartz translucides, minérauu lourds, ciment de calcit4er, parfais canai■ ir RAI\,

I INDICES ET ESSAIS

ga-z dari : :: balm;

I

soot"p

FORAGE SOQU I p ST-F€l::! I€`: NO 11

10800 HOD

PROFONDEUR DE

403,0 mkb

1 e ~

~

i

OEOLOOUE r€nuDF MnItIN (6éONIROM

A

525,0 mkb

tr-Yi {rr rrr rrl r aJvtJ11. 4JL I VrVlig=L

treizième (13)

0

Formation arésumée; Fm de Québec Citu

LITHOLOGIE RESUMEE

TH is 15% rsrlrsrïrw brun clair è brun tancé,parfois chamois, argileux e très argileux, microcristaiiin, partais Mi-lieux is urèaceuK,

Taux d'avancement; s

403-440 mkb 440-525 mkb

07--17minimetre

04-10 minimetre

Forage avec le "mud motor..

Indices de gaz; 435,11 mkb 449,11 miCD 505.5 mkb 520,0 mkb

604 unités 2I I unités

1252 unités 513 unités

aaaal.Id -r r-r rrroar 1111 )11._ t.) C1 ESSAiS

gaz dans la boue; 60 é 120 unites-403 â 4011 99 is 200 unités-480 it 525

mkb mkb

t

g t.l1HOLOGIE RESUMEE

M Frnnressinn; 98,36

SOQUIF ST-F1.801EN NO 11

Statut; poursuite du forage

PROFONDEUR DE 304,6 natte

A

JOUR DE FORAGE douzième (12)

GEOLOGUE 1 MIME M0111 N (fiéON l ROM

formation présumée; tin de buébec E.ity

i

I

t

403,0 mkb

311h, fi mt:h-4113;11 net);

1 15% a 100% shale gris foncé $ noir, (calcaireux) souueait brunâtre (très calcaireua),parfois striés et lustrés., rarement avec une surface lisse de couleur noire tp!a:: de g!lssement- croute de 0,5 mm-comme cuit)

t TR â 20% calcite de fractures, blanche a brunatre,chamois

clair, cristallin niog.n a grossier, plusieurs impurtés nnires,ctivage de la calcite Men nenni, trace de bu-

TH

présence de la silice (translucide),

lu â i O % gris blanc â brun clair, parfois brun foncé, grains très fins à maliens. i ens. sub-arrondis à arrondis, mal triés, quartz translucides, .:■ inéraus lourds, ciment air. r•a E )tao nlorfsia- cO:cairr... •

I

i INDICES ET ESSAIS il_

gaz dans la boue;

t

i1uu.Cieiiie ( 1 2) JOUR DE FORAGE

WOOD MRS)

1

~

~ FnI

CEAUDE MORIN (6é0NfROM1

U5-O7minimetre 304-340 mkb 10-25minlmetre

~ 340-403 mkb

SOQUIR ST-FLAUiEN NO 0

Formation présumée; Fm de Québec City

LITHOLOGIE RESUMEE

TR è 15% calcaire brun clair é brun foncé,parfois chamois, argileun e très argiieun, microcristailin, parfois sil- teun è gréseux,

Tain d'ouancement;

~i~i~titi••

3,6 degré 3,6 degré

F oir 8ge aima; !e "mud

314 mkb 333 mkb

déviation;

INDICES ET ESSA1S

gaz dans la boue; 40-10 unités

i

PROFONDEUR 304,6 mkb

403,0 mkb DE

A

onzième (1 1) ,;^»~; DE FORAGE

SOQIIIP ST-FLRUIEN NO 8

302,5 mkt)

304,6 mkb PROFONDEUR DE

A

UEULUUUE

CLRIiOE

MORIN (GéONIROM

Formation présumée; Fm de Québec Cita

LITHOLOGIE RESUMEE

Progression; 2m

Operation; test OOP, etc

a oenir; poursuite du forage

i

i

I

INDICES ET ESSAIS

gaz dons la boue;

»..»:::.::« , .•.. • •-•••••••••••••••-•.••••••••••••••••

SOQUIP Si-LL8U1€*+1 NO 8

i

PROFONDEUR

JOUR DE FORAGE

DL 302,5 mkb

302,5 mkb A

disfïème (10) 1

CLw~JOE GEOLOGUE MOR!N (GèUN!g0lrf

1

i 1

formation priâsiiiiiiée; fm de Quebec City

ISÎI-IOLOGIE RESUMEE

Progression; 0

Operation; pôib- é ûu BOP

a uenlr; test du OOP et début du forage

i i

INDICES ET ESSAIS

gaz dens In boue; i

FORAGE SOQIIIP ST-FLIIUIEN NO 8 DATE 1992-01-16

(0800 MIS)

0.41.11.1

UN.._ ... ....... .

i

nnr.frre-ra ertirs orb rtir 1 11.LJr LJ17rLJLLJIt LJL.

A

~GUfi ~C FG^t,~F

302,5 mkb

302,5 mkb

neuuième (9)

GEOLOGUE

CLAM MORiN (6é0NIROM

Formation présumée; Fm de Québec City

Li l-IOLOGiE RESUMEE

Progression; 0

Operation; i imtii otiva

e venir; pose du !!OP s

ii`rii1icES ~ i ESSAIS

g a z dans boow;

FORAGE DATE

302,5 mkb PROFONDEUR DE

1992-01-15

f0800 HMI

~

SOQUIP ST-FLBUIEN NO 8

A 302,5 mkb

Lena tral r'r rrtinar-

JJ%Jft L7L I ,..."11111L -

Formation présumée; Fm de Québec City

LiIHOLOGIE RESUMEE

Pranrassnn; O

Operation; Alésage du puits jusÿu

pose du tubage

1 w msdnir- - :.:meinta#ion et pose du BOP

I

INDICES ET ESSAIS

gaz dans la boue; (background) 63 unites

huMtieme (8)

OF01 OG [JF

CLAUDE MORIN (GeONIROM

a 302,5mkb

1992-01 -11 ~t v• r r SOQUIP S:-EL~:!!:L`: NO 8 i

i FORAGE

10800 HRsI~ 1

302,5 mkb VC

In ~ I~SiVf~~~JtMÛ'EVrE

302,5 mkb A

septième (7) JOUR DE FORAGE

Formation présumée; Fm de euéâec (fig

~

~

I

~

1

GEOLOGUE ~

GLOW MORIN (GéONIROM1

i

~ f

~

~ Uii~OLOGiE RESUMEE

~ ~ 1

~ ~

t l 1

iti ■ ~ J ~_ - t - ' 7' r` ~pC~aalv~~, n~~â~~~ uu "-suits ,~ü~gii s ..n~i`i~,.~imrkb

Progression; 0

w -~ y.~..:~- ev4IZe the tomberont et RIIP

i

INDICES ET ESSAIS ~ aga_ dans la boue; 250 mkb 10 unités ~ ~

Se-~I tri r1r rr-tirtiir'•f-4.! %-, t V11- F VItrVl7L

~ Formation présumée; Fm de Québec City ~

i *dFHOLOGIE RESUMEE

#

~

GEOLi]GUE I

MnR1N (béllN!!!0M1

~

~ 1 E

S1SEeme (6)

Progression; 53,5 in

Statut; POD, alésage du trou

245-3U2,SmCb;

87%-91% shale gris f ûnm% tendance bi unâtre,cai[aireuli é trés calcaireuH,parfois lustré

T~ a oflP -~ -s- -~- - ■~,- ! V ~ a~~41~ fi! %S

I

I ~ Déviation; 246 mkb 2,7 293 mkb 3,3

I !2S6 mirth 2~i , ~ 2b5 mkb 2,~ ~

~ 2?4 mkb 3,2

I s I-s

I

111,-10% calcite de fractures, brun clair foncé, parfois niant s transparent

INDICES Cr ESSAIS

gaz dans la boue;

soot//p G

i

FORAGE DATE

DE 249,0 mkb

PROFONDEUR

A 302,5 nab

~

1992-01-13

[0800 I105)

SOQUIR ST-FEAUIEN NO 8

1992-01-12 cnrrelatïnn

st-fluuien no S st-flauien no 3

+-136.45 on

4123.47 fi qaater■ei re_ : 135,?5

--- ---- ---- . (9.2)

. ~ i NNW VIM WEI 1M Ill Eli I= We OM Eli upa maw wit mi

52.95

niueeu de I® mer (a

~83.47 n

klip pe de le

cheuriere

I--------- _----------~

~------ --- --- -} -

~---~-----`

F.-------••----------- t

-------- F---=_----n---~-_--:

1

..... ... :^~ - ...........

25 ni I

gruu pe

de

(Liebe( cite

-159.us n,

SOQUIP ST-FL:WIE`: `10 8 ûvi~t 1992-01-12 FORAGE

(0800 1111S)

I PROFONDEUR DE 0 mkb

A

JOUR DE FORAGE un (1) it cinq (5)

GEOLOOUL CLIME MORIN (6éONIROM

Formation présumée; Fm de Québec City

LITHOLOGIE RESUMEE

Progression; 249 m

Statut; poursuite du forage

Il

7,2-20,4 mkb;

sable quaternaire, grossier it très grossier, 70% de quartz présence de blocs de is ïcïippe de ia Chaudière, (shale et près uerdètre)

Il

20.4--60,5 mkb;

alternance de shale gris à gris foncé et de shale gris foncé it noir, aspect lustré, parfois silteuu,---Klippe de la Chaudière, 1 (Lomhrien intérieur)

60,5-249 mkb;

I Formation de Québec City, shale gris è gris foncé,calcaireus

I INDICES ET ESSAIS

I gaz dans la boue;

I

e

~

~

a

FORAGE ii 080s1 lins)

■ ~ s a_ w r r ~. Snell!? CT._C1 /F111C\i \1n o ~~{rrrr .a ■ e a.rrVr<~w !In v'

DE o mkb

PROFONDEUR

1I:.'. • • - ";.1 a1lHb•+f1?1MN+' ~! . .,. . . .

249,8 mlcb A

1F-4i 113 E"4r r1'lrE i r~ r •Jv1Jil 1_3 à— i a.l11FSL?L

un il) cinq (5) ~

l414 t H-_;u1.7

CLAUDE MORIN [6éONiROM

Formation présumée; tm ne Québec City

LITHOLOGIE RESUMEE

~

~

ô irrrar a•a1a•airasaaar f"ola.a es ma a•lair a• Ilraars as afarara•ir rraâ— ■a .14 II ara Ma- aaaU.7arr 4Sirr444 4rarL 4Lala11 4 ara Slar a.rra a.ra MAI ariaar4r ■ vilMr.a+, arrr

crocristullin, présence de stglolites,

note;

Les carbonates obserués dans le puits de St-flauien No-3 sont inclus dans la Klippe de la Chaudère, tou-tefois, ici, (St-flauien No-8), les carbonates ont été irlr.i~is dar1s ,a Fin. de Québec City puisque selon l'au Leur, il n'_q a pas de carbonate qui a été décrit pour cette section dans la littérature de la région_ Les cui-bouates se prêtent mieux é la formation tris cal caireuse du Québec City de l'ordouicien moyen équi-valent distal du Trenton.

Taux d'avancement; 5 $ 18rnin/metre

Î

it4DICE ..) ET C331î13

gaz dens la boue;

I

SOQUIP ST-FLAVIEN NO 8

RAPPORTS DE FORAGE

JOURNALIERS

=IpQU _L IP I7AZ L,Y 171-11L.L:LNG :F2iL' PpFt9p

_____ WELL: EL: SOG01P ST-FLAVIEN P3. 1 REPORT t: 1-A DATE: - 92-01-06/07 !I DEPTH: PROGRESS: rotating hours (last 24 hours) °PER € 0800hrs: FOREMAN: uilf/Raody MOBILE MO.:

DAILY COST: $11,115 BOLE COND.: WEATHER: Clear, windy TOOLPtSHER: Gerry Goblet

CUM COST: $207,715 CONTRACTOR: Wee 1 TEMP.: -12 C T.P. MOBILE: FORMATION: K.B. ELEV.: ROADS: Good MOBILE CHANNEL:

BIT PERFORMANCE DRILLING FLUID PUMPS Bit No.

Size (maÎ Mfq. Type ,Serial I Mottles Fro*

To ors on Bit ~WOB Ida!)

RPM

Condition ,Pulled For?

Meters 'n'hr Cum Hrs

ise

+I••th I- ..ity

+ • Gradient rs

I.

P -Is

•. • ater Loss

Filter Cake

•lids

4i1 Pf,'Mf +nT

1 a Salinity

d Co. 1 d Engineer I dded Up €

Pump Mo. 1 Pump No. 2 !. e national Disco + ••el )1-P-80 D-700 Liner X Stroke

' •. Rate t3Juin +' •. Efficiency 1 . +• Pressure kPa illpipe AV ■,min

n illcollar AV m//tin I •rile Veloc. •`sec 1 ad Cycle tin +:•ttots Up ein ud Tanks 13

:ole Volune m3

ystem Vol. 33 MUD ADDITIVES SURVEYS Gel

Caustic Soda Lignite Peltex Line

CaC12 SAPP Alconer

Soda Ash

Sawdust

Mud Check.? Mud Daily Cost Mud Cum Cost

Ho

;IXER !LAKE Payne 1 Harris

SHAKER MESH SOLIDS CONTROL

DESELTER C.F. ikg;'n3)

1o1 illmin) 4.F. (kg/m3) ;ours

CENTRIFUGE

VOLUMES i Wtr Hauled

Losses to Form.

BOTTOMHOLE ASSEMBLY (No., Iten, CO, ID, TJ Type)

P•. Length I veil WOB is DP in Hole

Hook Load Jts DP on Racks Jts DP on Location

da!

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL 'Drill

Tripping Rig Service Survey

Nipple BOP Pressure Iest

Condition Hole Casing

Cenent Casing Bowl Rig Cp Tear Out! Slip, Cut

(Drillout Cat

21

Coring Logging

DST

Circ Samples Rea. Rathole Handle Toois

Rig Repair leaning

Lost Circ iork Pipe Fishing wait on Orders

Total Ers 24

1RSPP kPa,'SPM Nax Csq Press kale Hole Fill Act Hole Fill Last HOP Drill:

Daylight Crew Afternoon Crew Graveyard Crew

SHOCK SUB (S'N, Make, Days in Bole)

Spud €

Dry Out Shoe €

,Back Ong € 1st Log €

Surf ID € Core Pt € FTD €

Bit StopDrlu4 Rig Release €

24 HOUR SUMMARY {01:00 his. 9142-06. Held pre-spud meeting at SOQDIP's offices ie Quebec City. Discussed safety, lease Coesstrect.ion, services in place, etc. to 12:00 hrs. Travelled to location. Derrick standing, boiler operating. telex Rig 11 rigging up to pmd. Surface casing, jars and bits am track arrived at location. Unloaded same. ATM wellsite shacks on location and potted. Tracked hoe used to *tower to break frost for buried tanks and shale tank. Noe then proceeded to dig holes for

buried tanks. Roe SDF1 at 11:00 hrs. liggimg to spud to 08:00 hrs., 92-01-07.

ij

!Strap € Board Tally !Measurement Made Corr.?

50498DR1A.511: 1 fi 92 EIERCON EMCIMEERING LTD.

S OQ 11.3 I= P DAII...X DI2ILLSNG RFPC)RT WELL: 90QUIP ST-FLAVIII ID. t REPORT t: l-B DATE: 92.91.06/07 DEPTH : PROGRESS: rotating hours (last 24 hours)

OPER C 0600hrs: FOREMAN; Wilf/tandy MOBILE NO.:

1DAILY COST: $44,115 HOLE COND.: WEATHER: Clear, windy TOOLPCSHER: Gerry Ouimet

CUN COST: $207,715 CONTRACTOR: Raiex 1 TEMP.: -12 C T.P. MOBILE: FORMATION: K.B. ELEV.: ROADS: Goad MOBILE CHANNEL:

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit Mo. Site (mml 'Mfg. Type Serial 1 JMorzles /From 70

rs on Bit +SOB )daN) RPM /Condition Pulled For? Meters a hr Cue Its

Tine c- th Density Mud Gradient Vis

is

'•ter Loss Filter Cake . .

Solids Oil Pf;Nf uT

Cl Ca Salinity Mud Co. Mud Engineer Mudded Up t

'Model

1Pump

Pulp No. 1 Pulp No. 2 Make National Bosco

3-P-$0 D-700 Liner I Stroke SPM

Pump Rate Clain Pimp Efficiency t

Pressure kPa Dri1lpipe AV m/min Driilcollar AV train )rotrle Veloc. It sec Mud Cycle min Bottoms Cp min Nud tanks m3 Hole Volume m3 System Vol. m3 MUD ADDITIVES SURVEYS

Gel Caustic Soda Lignite Peltex line CaCl2 SAPP _lcomer Soda Ash Sawdust

Mud Check? 'Mud Daily Cost Mud Co Cost

In

SHAKER MAKE Payne i Harris SHAKER MESH SOLIDS CONTROL

DESILTER G.F. ikg/m3) Vol iljnin) O.F. ikg/a3) tours

CERTRIFCGE

VOLUMES /Cum Wtr Hauled Losses to Form. BOT1OMHOLE ASSEMBLY (No., Item, OD, ID, TI Type)

IBHA Length Avail WOB ,its DP in Hole

Hook Load Its DP on Racks Jts DP on Location

dal

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping Rig Service Survey

fipple BOP essure Test

ondition Hole sing

eaent iaq Boil

fig Sp 'Tear Out, SliprCut

If'^` )Drillout Cat

24

Coring Logging DST

Circ Samples Ream Rathole Handle Tools Rig Repair Reaming

Lost Circ Work Pipe Fishing trait on Orders

Total Hrs 24

RSPP kPa/SPM Max Ong Press Calc Hole Pill Act Hole Pill last 80P Dtill: Daylight Crew Afternoon Crew Graveyard Crew

SHOCK SUB ISM, Make, Days in Hole) Spud t Drl Out Shoe F Back DrIg € 1st Log t

Surf TD t Core Pt FTD Bit Stop Drlq t Rig Release t

24 HOUR SUMMARY :00 hrs., 92-01-07. Traded hoe finished digging pits for buried tanks. Spotted and backfilled

Installed shale catch tank sloped from ground level to matting level. Rubber tired hoe started Iec'd and unloaded 2 trucks with mud products. Recd and unloaded 1 centrifuge plus racks. teed {directional and coring equipment. Placed water reservoir and installed septic tank for wellsite tank pit to build bermed pit for drill cuttings storage (15.5n r 22.5n r le high) complete mitt prig flare pit. III with 311/ bit and surveyed conductor barrel at 1/2 deg. Welded drain plug an conductor pipe riser. Started haunting water at 15:00 hrs. Coati/iced rigging to sped to 20:00

Icrtr

Ming rathole. Encountered some gravel to 24:00 hrs. Plop So. I started knodciag, found gravel esured drilling ratbole to 03:00 hrs., 92-01-03.

same 13' below grade. digging trends around rig.

and unloaded shacks. led dirt from buried forklift ramp. Started digging

on Conductor pipe and welded hrs. fixed and and started

inside. Repaired same,

J

Strap @ 1Board Ially IMeasureaent iNade Corr.? v SOQ6DRlB.ILS 92

WELL: SOQULP ST-FLAV111 L. i EKE: 70 x403 PROGRESS: ER @ OROOhrs: Wig 2221 pilot hole

AILY Can: $24,722 BOLE CORD.: Good

1 COST: $232,437 CONTRACTOR: laies 1

REPORT t: 2 DATE: 92-01-09 70 m in 13 3 4 rotating hours (last 24 hours)

FORERAK: Wilf Erawcbmk MOBILE NO.: :LATHER: Cloody TOOLPVSHER: Gerry Guimet TF]IP.: -15 c T.P. MOBILE:

SCDC) LI I P IDA, I_. 17R XI— IL, ING REPOPVT'

FORMATION: Surface K.B. ELEV.: 6.90 to Grd. ROADS: lair/Good MOBILE Ch ARMEL: J BIT PERFORMANCE 'DRILLING FLUID PUMPS h

Bit lo. Site (1) Mfg. Type S_rial 1 Mottles From To Ers on Bit 1408 (daMl RPM Condition Pulled For? ]Meters niter Cun firs

11 311

Searity IT 5335 527661 3/15.9

0 24

2.75 1000 - 2000

70 2-2-I

Bit mange 24 1.7 2.75

2A 222 lead RP12

100905

3/15.9 24 70

11.00 .,pE 5000 140

trilling

Drilling

46

4.2 13.75

Time Depth 'Density 3lud Gradient ',is •'Y iP

'Gels

Water Loss ,Filter Cake I • „

Î •lids 4i1 ' ;'Nf

Iir:T

•liaity . Co.

Mud Engineer (Mudded Up @

SURVEYS '

1:00

70 i.. 1010

75 I

U.5 i1'

RI rig Cheri Surface

'finer

Iv

1:1

Pump No. 1 Pump No. 2 a Matioaal >

I „ 1 1P-10 D-700 1 Stroke 152 z 203 203 z 406

El 45

,, late 1.1 13/min

+' .• Efficiency 100 4 ,. Pressure 2000 M'a

o illpipe AV I/1 a/min illcollar AV 70 Cain

+ .ttle Veloc. 31.12 a'sec

N h

h

h

jji;.ttoms 1,

1 ud Cycle sin

Up aim , Tanks a3

dole Volume 0.0311 a3 System Vol. 13

1

I P MUD ADDITIVES

Gel Caustic Soda Lignite Peitez Lime

(CaC12 SAPP Alcomer Soda Ash Sawdust

k ud Check'. + ud Daily Cost

ud Cum Cost

52 3

So $742

$742

1/4 @ 21 1/4 @ 40

0 R 51

SHAKER NAKE Payne 1 Barris

: AEI MFSH 3(1 s 40 (Twin Makers) 01 t:

SOLIDS CONTROL DESILTER

F. (kg/131

01 (I/aim)

I.F. (kg/131 ;.urs

CENTRIFUGE

_

h h

VOLUMES • Itr Hauled •, to Pon.

BOTTOMHOLE ASSEMBLY (Bo., It es, m, ID, T3 Type) li Bit, 1191 (222! OD), HIS (2221 2.141), IBS (2220 OD), 1 short

OD), 1 short DC DC (171 OD, ID, 5180) - laded

Hook Load Jts DP on Racks Jts DP on Location

(1711 OD, 2.341), IBS

up INè. 15,000 dal

h

h

h

1(2221mm OD), 4 DC rr:. Length ,pail i0OB is DP in Bole

(171 OD, 700 51.11m 5,000

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill

Tripping ig Service urey ipple BOP essore Test

onditioo Hole sing

event ing Bowl

Rie Up Tear Out Slip Cut fr-r

plr illout Cat

13 3/4

3/4

1 1/4

Coring

Logging DST Circ Samples Reaa Rathole Handle Tools Rig Repair Reasing

3

Lost Ciro work Pipe Fishing Wait on Orders Safety Meeting Install KB Rat ;;ousehole Total Hrs

I 1 1/2 2 1/4

24

,ISPP kPa/SPM

Act Hole Fill

3)aylight Crew

`Graveyard Crew

Max Csg Press Calc Hole Pill

Last BOP Drill:

_Afternoon Crew

SHOCK SUB iS N, lake, Days in Holel Spud € 1300 bows 92-01-01 Drl Out Shoe € Back Drlg € 1st Loa €

Surf ID @ Core Pt € PTA € Bit Stop Drlo Rio Release €

24 HOUR SUMMARY 1.:00 hrs. Fix mud, condition bole and raise vis, install pump in cellar and pmt 0d back into and tank. Cootizued

filling rathole and monsehole. Gravel and boulders to 10:45 hrs. Pre-spnd and safety meeting with crew to 11:30 hrs. Install telly bushing to 13:00 hrs. Spud with 311mm bit. Drill down 222:m drill collar and survey to 16:00 hrs. Laid down 3111 tools to 17:30 hrs. Safety meeting, measure, calliper and pick up lad op assembly, and 222mm bit to 20:30 brs. Frill pilot bole with 2221 bit from 24-35 m103, erratic table tome, boulders to 24:00 hrs. Drill 2221 Role 35-70 ddB, ...time to encounter boulders, survey as required to 01:00 hrs.

te: Fisher systes arrived at 18:15 hrs., 92-01-08. Spotted same.

Strap € Board tally jHeasureient iMade Corr SOQ8DR02.XIS 1'16/92

N ENGIMECRIMG LTD.

SOQLl>CP COAZ_LY 0'1R. L, 14 RE]PORT

WELL:

SOQUIP S7-FLAYlBI 80. 8

REPORT I: 3 DATE: 92-01-10

DEPTH:

119 aRB PROGRESS:

49 a in 13 314

rotating hours (last 24 hours)

OPER @ 0800hrs: Orlq Min pilot hole H 136 m3B FOREMAN: Wilt Rrawthà MOBILE HO.: (418) 728-3648

DAILY COST: $21,407 HOLE COED.: Good WEATHER: Overcast TOOLPCSBER: Gerry (Wallet

CUM COST: $259,844 OOKTRACIOR: Ralez 1 TEMP.: -$ c T.P. MOBILE: (418) 728-2631

FORMATION: Sorfam K.B, ELEV.: 143.55 ROADS: Good MOBILE CHANNEL: I/1

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No.

Size (m) Mfg.

Type Serial I Nozzles

From 70

on Bit

(dal()

RPN Condition Pulled For?

.Meters m Lr iCim Hrs

21

222

Reed IP-12-JR

100905 3/15.9

24

117

24.50 2-5000

160 3-2-I

DeTiation 93

3.8 27.25

3A

222 teed

8P-13G-0R 100843

3/11.1 117

119 1.00 2000

160 Drilling

Drilling 2

2.0 28.25

ile a pth

ti•nsity Ind Gradient

'is

is

ter loss

Filter Cake

'lids

')i

r !Nf uT

1 .

unity ~ d Co.

ud Engineer dded Up @

20:00 115 mRH

1055

55

9.5

II

Slzrfaoe

'Pump

Pump No. 1 Pump lo. 2 Make National Basco Model 8P-80 D-700 ,Liner 1 Stroke 152 z 203 203 z 4)6

SPM 40

Pump Rate 1.76 13/min Efficiency 90 4

Pump Pressure 6000 kPa illpipe AV l/1 a/min illcollar AV 112 lade

zzle Veloc. 101 ■;'sec ud Cycle 28 En

ttoms Up 3 sin !Mud Tanks 45 m3 Hole Volune 4.6 a3

System Vol. 50 113 MUD ADDITIVES SURVEYS Gel Caustic Soda

lignite Pelte: •Lime

CaC12 S.APP :loner

Soda Ash Sawdust

Mud Check? Mud Daily Cost Mud Cut Cost

160 SI 6 SI

10 $1,440 $1,530

3/4 H 77 1 1/8 H 96 1.4 H 105

1.7 H 115

SHAKER MAKE Payne i lams SHAKER MESH 30 z 40 (ilia Shakers) SOLIDS CONTROL

DESILTER C.F. (kgia3)

Vol fl/em) O.F. ,kg/m3) lours

CENTRIFUGE

VOLUMES . itr Hauled osses to Fors. iii

BOTTOMHOLE ASSEMBLY (Bo., Item, OD, ID, TJ Type)

Hit, lB-IBS(222mm 2.8416, IDS (22), OD), 11-DC (171mm

*BHA Length Avail MOB Jts DP in Bole

OD), 2-IDS (2221m), 1 short DC

OD, 70mt ID, 114.70e

1 short (171mm OD, 2.371), 5890) - lotted Hook Load Jts DP on Racks Jts DP on Location

DC (1711m OD, IBS (222s•

daN Î

up MIA. 20,000

11,000

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill

Tripping

Rig Service ,Survey „nipple BOP ,Pressure Test

Condition Hole ing

event

Rig Up Iear Outr Slip Cut

v+OC Drillout Cat

ing Boil Spud

11 3/4 3 1/4

1

Coring

Logging DST Circ Samples

Ream Ratbole Handle Tools Riq Repair Reaming

Lost Circ

Work Pipe

Fishing Wait on Orders Safety Meeting

Install KB Rat/Nousebole Total Hrs 16

RSPP kPaiSPM liar Csq Press

•Calc Hole Fill

Last BOP Drill:

Tlaylight Crew ,Afternoon Crew 4Iraveyard Crew

rAct Bole Fill

t I

SHOCK SUB tS,N, Make, Days in Hole)

@

Drl Out Shoe €

Back Arlo € 1st Log €

1300 hours 92.01-08 Surf ID €

ETD F Bit Stop Drlg € Rig Release t

Core Pt € •

19:45 hours 92-01-09 iï I

24 HOUR SUMMARY 1 1

08:00 hrs., 92-01-09. Drill ahead 222am pilot hole from 70-105 mFB, reduced MOB from 5000 to 2000 dal, started surveying every connection doe to deviation, control drill to 16:00 hrs. Drill ahead frog 105-117 1811, 2000 dal ROB,

y still increasing to 19:45 hrs. FOB, found hit worn slightly. Removed 3 pt BB reamer and installed 2-I3S L BRA

(ultra-stiff). Rade up Bit #31 and III with same to 23:00 hrs. Drill 222mm hole, austral drill with 2000 dal Eh from 117-119 mig to 24:00 hrs., 92-01-09.

te: Reports are now 24:00 to 24:00 hrs.

j i

I I

j

Strap € IBoard Tally jMeasurement iMade Carr.? SO¢8DR03.1LS 1, 9

SOQU I P IL) A1:LX DIZ=LLSNG lE2EpQ12T

WELL: SOQULP ST-FlAVIKI M. R REPORI l: 4 DATE: 92-01-11

DEPTH: 163 me PROGRESS: 44 m in 22 rotating hours (last 21 hours)

OPER @ 0800h.rs: Dr1q 222nn pilot bole R 181 mKB FOREMAN: Sill Rravrbuk MOBILE NO.: (418) 721-3648

DAILY MGT: $14,762 HOLE COND.: Good WEATHER: Clear TOOLPUSMER: Gerry Millet

CUM COST: $274,606 OONTRACIOR: Raley L TEMP.: -15'C T.P. MOBILE: (418) 721-2631 li FORMATION: Surface K.B. ELEV.: 143.55 m ROADS: Fair MOBILE CHANNEL: 1/1 I

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No. Size ism) Mfg.

'Type Serial I Nozzles

From To Mrs on Bit W38 (da$)

RPM Condition

Pulled For?

Meters Or Co Hrs

31 222

Read IDS-13G-.IN

100841 3-11.1 117

163 22.50 2-4000 160

Drilling

46

2.0 50,50

,Solids IOU

Time

bepth ?ensity 7[ud Gradient

is

PV 7P Geis pH

dater Loss Filter Cake ,Sand

Pf 'Hf ,MBT

)C1 Ca Salinity

Mud Co.

Mud Engineer Mudded Up C

20:00 hrs

153 KB 1070

48

9.5

NI Dig Fluids

Mace

'Pump

Pump No. 1 Pump No. 2 Make National Basco Model 8P-80 D-700

Liner X Stroke 159 z 203 203 z 406

SPM 100

Pump Rate 1.11 nllmin

Efficiency 100 l Pulp Pressure 5000 kPa

Trillpipe AV N/A ■/min

larillcollar AV 70 1Juin

Nozzle Veloc. 63.5 m/sec

Mud Cycle 51 sin

Bottoms Up 2.5 min

Mud Tanks 50 s3 Hole Volume 6.5 m3

System Vol. 56.4 s3 MUD ADDITIVES SURVEYS

Gel Caustic Soda

Lignite Peltex Line

CaC12 SAPP Alcoser

Soda Ash

Sawdust

Mud Check? Mud Daily Cost Mud Cum Cost

11 sz 1 sk

No $300

$1,830

1.9 8 124 1.9 8 134 1.9 E 143

1.9 8 153

i

SHAKER MAKE Payne 6 Harris (deal shakers)

SHAKER MESH 30 z 40 SOLIDS CONTROL

DESILTER L.F., (kg)(0)

Vol (Olin) O.F. Ikgim3) Hours

CENTRIFUGE

VOLUMES Cum Wtr Hauled Losses to Form,

1500 bbls Nil

BOTrOMHOLE ASSEMBLY (No., Item, OD, ID, TI Type)

Bit, IN-IMS422212

(22214), 1 short 70mm ID, 5890) BRA Length

Avail WOB Its DP in Hole

00), 2-IDS (2221m),

DC (171mm OD, - locked lip 8111.

151.49 1

1 short 2.391), IBS (222=

Hook Load Jts DP on lacks Jts DP on Location

DC (171ee 00, 2.8481),

OD), 15-DC (1711m

24,000

IBS

OD,

dal 15,000

DRILLING OPERATIONS TIME BREAKDOWN WELL. CONTROL Drill Tripping Rig Service Survey

Tipple BHP Pressure Iest Condition Hole easing

,Cement

Casing Boil Rig CpTear Out

Slip Cut

illout Cmt

22

1/2 1 1/2

Coring

Logging AST Circ Samples Real Rathole Handle Tools

Rig Repair Reaming

Lost Circ Work Pipe Fishing

Wait on Orders Safety Meeting

Install KB Rat,Mousehole Total Hrs 24

-RSPP kPa/SPN Max Csq Press Calc Hole Fill Act Hole Fill

Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

SHOCK SUB (S H, Make, Days in Hole(

Spud 1 Out Shoe €

(Back Drlg € 1st Lou B

Surf ID € Core Pt € FTD É Bit Stop Drlg K Rig Release €

24 HOUR SUMMARY

:00 hrs 92-01-10. Drill ahead, control drill with 2000 dal HOB to control deviation, survey every kelly does, from 119 to

155103 to 19:45 hrs. Survey stayed at 1.9 deg, increased MOB to 4000 dal and drill ahead from 155 to 1631103 to

24:00 hrs 92-01-10.

Strap € lBoard Tally Measurement [Made Corr.'. - SOQ8DRO1.Y1S 1 13 9

S OQU = P

n2IELY 1JR1LLTNG REPORT

WELL: 90001P ST-malls No. 8 REPORT 1; 5 DATE: 92-01-12

DEPTH: 249 ma PROGRESS: 86 1 in 19 rotating hours {last 24 hours)

OPER @ 0600hrs: Driq 222mx pilot hole @ 261 WE FOREMAN: Wilt KrarctXt MOBILE NO,: (411) 728-364$

DAILY COST: $24,509 HOLE COND.: Good WEATHER: Partly Cloudy TOOLPUSBER: Gerry Millet CL'K COST: $299,115 CONTRACTOR: Weil TEMP.: -18 C T.P. MOBILE: - (418) 728-2631

FORMATION: Surface K.B. ELEV.: 143.55 1 ROADS: lair MOBILE CHANNEL: I/8

BIT PERFORMANCE DRILLING FLUID PUMPS Bit No. Size (ml Nfg.

Type

Serial 1 Nozzles

From /To

)irs on Bit 94B (dal) ,RPM IConditioa Pulled For? ileters a hr Cup Mrs

1A

222 teed

HP-13G-I

100843 3-11.1

117

175

26.75 2-4000 160 3-2-1

Deriatiod 58 2.2

54.75

4l 212 teed

S-21G-1 813544

3-11.1

175 249

14.75

4-10000 160

killing

74 5.0

69.50

iue n- pth a nsity

1 d Gradient 'is

-Is

H

•ter Loss Filter Cake

r- , ...lids f11 i ,/If :T

I 1 ) •

I .linity 1. ud Co.

I d Engineer dded Up @

20:00 lira

153 03f ake 1070

48

9.5

84 Drlg Fluids

9aïace

Pump Mo. 1 Pump No. 2 rational Disco

Model 8P-80 D-700

Liner X Stroke 159 r 203 203 r 406 'SPM 40

'Pulp Rate 1.76 13/Tin Pump Efficiency 90 E Pulp Pressure 5000 kPa

Driilpipe AV I/l m/min Drillcollar AV 112 n/min Nozzle Veloc. 101 a;sec Nud Cycle 34 min .Bottoas Op 2.2 min 'tic! Tanks 50 a) Hole Volume 10 el

Systen Vol, 60 143 MUD ADDITIVES SURVEYS Gel

Caustic Soda Lignite ' Itex

Line

aC12 APP klcoaer

..a Ash

.wdust

ud Check? d Daily Cost

c d Cun Cost

Ho $776 $2,606

2.0 @ 161

2.2 @ 171

2.3 @ 180

2.1 @ 190 2.5 @ 200

2.5 @ 209 2.5 @ 219 2.5 @ 228

2.5 @ 237

SHEERER HARE Payee i Harris (dual shakers) SHAKER MESH 30 z 40 SOLIDS CONTROL

DESILTER U.F. {kg/n3)

Vol 11/min)

b.F. Ikg/a3) flours

CENTRIFUGE

VOLUMES I Wtr Hauled osses to Form.

1500 bbls Iii

BUTTONHOLE ASSEMBLY {No., I tea, OD, ID, TJ Type) Bit, IB-I16(2220 (222em), 1 short 15 -0C (171mm OD,

Length ,'rail 0313 Fits DP in Hole

OD), 2-1B5 (2220), DC (1710 OD, 700 ID, 51190), 160.92 ■

1 short 2.391), HS (222040D),

41P - lotted up Hook Load Jts DP on Racks Jts DP on Location

DC (171ms CO, 2.841), 1-looel

BR.

28,000

I1SS DC (171 C),

dal

(114ms, 4 1/20) 103

16,000 97 6

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill

!Yipping

Rig Service Survey

Nipple BOP Pressure lest ?Condition Hole Casing

ICanent

Casing Bowl

Rig Up Tear Out lip Cut

(Drillout Cat

19

2 1/4

1/4 2 1/2

Coring

Logging DST

Circ Samples Real Rathole

Handle Tools Rig Repair Rearing

Lost Circ

Work Pipe Fishing

Wait on Orders Safety fleeting

Install KB

Rat Nousehole Total Hrs 24

.RSPP kPa/SP1

!lax Csg Press

Calc Bole Fill Act Hole Fill

Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

SHOCK SUB iS 1, Make, Days in Hole)

iSpud € 44 1 Out Shoe € :..k Orig. € 1st Log €

Surf TD € Core Pt € ETD @ Bit Stop Drlq € Rig Release @

04:45 bra 92-01-11

`` 24 HOUR SUMMARY 00:00 brs 92-01-11. Drill ahead 2220 pilot hole from 163 to 175MKB w/ low 4108 of 4000 dal to control deviation,

vey every single, to 04:45 bra. Trip for bit due to increase ix deviation build rate to 07:00 hrs. Drill ahead frog 175 to 2111118, control drill with low MOB, survey every single. Suspected formation Change between 209 and 2111KB due to very rood drilling and drilling break, to 18:15 hrs. Drill ahead frog 211 to 249m1 B, increasing MOB by 2000 dal every single (fro 6000 to 10000 dal) because survey stayed constant, penetration rate much faster now but periods of very Irougd drilling, to 24:00 bra 92-01-11.

Strap È Board Tall. IMeasurenent jKade Corr.? SOQBDR05.YLS 1 13 92

EMERCOM EKC!XEERING LTD.

E304C2LJ r P IDA XLY x7RZLLXNG 1E2EFOR'I`

WELL: 90)01P ST-PLAYTEX 110. $ REPORT f: 6 DATE: 92-01-13 DEPTH: 302.5 1103 PROGRESS: 53.5 ■ in 15 1 2 rotating hours (last 24 hours) OPER t 0800hrs: Opening Sole to 311mm @ 604143 FOREMAN: Milf Krawchuk MOBILE NO.: (41$) 72i-3644 DAILY COST: $17,734 HOLE CORD.: Good WEATHER: Cloudy TOOLPUSHER: Gerry Ouinet CL•MM COST: $316,853 CONTRACTOR: Iola 1 TEMP.: -17 C T.P. MOBILE: (411) 721-2631 FORMATION: Surface K.B. ELEV.: 143.55 ■ ROADS: Fair NOB[LE CHAIOIEL: I/1

rBIT PERFORMANCE DRILLING FLUID -1 PUMPS ;j Bit No. Size ima) Mfq. Type Serial t Nozzles

; From To Hrs on Bit

,Iî4)B (dal') RPM Condition Pulled For? Jleters n'hr Cum Drs

41 222

teed S-21G-.

DT3544 3-11.1

175 27$

24.00 1-4000

160 4-4-1

103 4.1

711.75

Deviatiam .*lids

SA 222

Seed S-210-J!. 113451 3-11.1

271 302.5 I 6.25

3-4000 160

Surf TD

24.5 3.9

15.00

Nine 'Depth ,Density 'Mud Gradient

is 1 J

P Is

1. ter Loss

Filter Cake • .

'i1 . If +:T 1

.linity ud Co. ud Engineer

.ded Op t

21:45 hrs 302.5 m

1060 10.39

40

9.5

NI Wig Fluids tig Check

Pump No. 1 Pump Mo. 2 Make Sational tmsco Model $P-80 D-700 liner X Stroke 159 x 203 2031 106 SRN 100

Puap late 1.11 Clain IuVp Efficiency 100 1 t'utp Pressure 5000 kPa brillpipe AV 39 main Dri11co11ar 1V 73 a/min 34ozzle Veloc. 64 t/sec

''Mud

Mud Cycle 56 tin .attoas Op 6 min

Tanks 50 23 'Hole V'oluse 12 a3 Systen Vol. 62 43 MUD ADDITIVES SURVEYS

Gel Caustic Soda Lignite Peltex Line CaC12 SAPP Alcoter Soda Ash Sawdust

Mud Check? Mud Daily Cost Mud Cun Cost

10 si

No $130

$2,736

2.7 @ 246 2.85 @ 256 2.7 @ 265 3.2 @ 274 3.3 @ 214 3.3 5 293

SHAKER MAKE Payne i Barris (dual shakers ) SHAKER MESH 30 x 40 SOLIDS CONTROL

DESILTER t.F. fkg)n3) Vol jl;nin) 10.F. fkg/113►

ours

CENTRIFUGE Surface

VOLUMES Cum t'tr Hauled Losses to Form.

1500 hhls Nil

BO`I1OMHOLE ASSEMBLY No., Item, OD, ID, TJ Type) Bit, IB-1554222ma (2222m), 1 short 15-DC (17141 MID, BRA Length Avail î40B Jts DP in Hole

OD), 2-IBS (222wa), DC 1171= OD, 70m ID, 51190),

160.92 a

1 short 2.394), IBS (2224

DP - locked tip Hook Load Jts DP on Racks Jts DP on Locati.n

DC (17/ma 00, 2.14■), OD), 1-Nomel

VIA. 2$,000

MS DC (171200),

da11 (114m, 4 1.218) 103

16,000 $9 14

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL (Drill Irippinq Rig Service Survey Nipple BOP Pressure Test Condition Hole Casing Cenent Casing Bowl Rig Cp Tear Out Slip Cut

Drillout Cat

15 1/2 4 1/2

1/2 2 1/2

Coring Logging DST Circ Samples Ream Rathole Handle Tools Rig Repair Reaming

Lost Circ Work Pipe Fishing iiait on Orders NuitiShot

Total Hrs

1

24

RSPP kPa/SPN )Max CO Press Caic Hole Fill ,Act Hole Fill last BIP Drill: Daylight Crew Afternoon Crew Icraveyard Crew

SHOCK SUB )S N, Make, Days In Bole) pud t 1 Out Shoe t ck Drig t

1st Log t

Surf TD t Core Pt t FTD @ Bit Stop Dr1g C Rig Release t

21:45 bra 92-01-12

11:45 hrs 92.01-12

24 HOUR SUMMARY 00:00 hrs P2-01-12. Drilled ahead 222mm pilot hole from 246 to 271mKB, $000 to 5000 dal MDB to control deviation, survey went out of last single, to 11:45 hrs. POOH and strap out. III with Bit 15A to 14:45 hrs. Drilled ahead from 271 to 302.5mKB surface TD, control drill with reduced MOB, to 21:45 hrs. PODS, take multisbot !survey every stand with single shot 20 deg camera), strap out, to 24:00 hrs 91-01-12.

II

Strap t 27$ WKB]Board Iall, 277.12 ■ 1Measurenent 277.70 m )Made Corr.? 0.12n Jiff, No SOQ8bROG.1LS 1 13/92

ENERCON ENGINEERING LTD.

_ Ca 01,J T i? 1-3A11I.,Y E7I-t:.TI L.,1:11VG RL,POF2~' WELT,: SOQUIP S1-7LAVl11 10. 1 REPORT is 7 DATE: 92-01-14

DEPTH: ]02.5 mKB PROGRESS: Nil (Reaniag) rotating hours (last 24 hours)

OPER @ O800hrs: Opening surface pole to 311mm @ 240tMn FOREMAN: Nilf Mrawchuk MOBILE 50.: (41$) 721-364$

DAILY COSY: $21,166 BOLE COND.: Good WEATHER: Saoving TOOIPCSHER: Gerry Ouimet CCX OUST: $33$,019 CONTRACTOR: Hale' 1 TEMP.: -6 C T.P. MOBILE: (418) 728-2631

FORMATION: Surface M.B. ELEV.: 143.55 a ROADS: Fair MOBILE CHANNEL: 1/A ~{

BIT PERFORMANCE DRILLING FLUID PUMPS Sit No. Size (no) Slfg. Type Serial I

Nozzles From

To Ers on Bit WOB (dal)

RPM Condition Pulled For? Xeters

n'hr Cun Hrs

61 111

Security Hole Opener

3-11.1 0 181

16.50 4-6000

160-80 Weaning

184

11.2 lean 16.5

ile

' pth ii nsity ud Gradient

'is PV

is

ater Loss

Filter Cake • d 'lids +il . :Mf jiKT

1

Salinity i ' Co. ud Engineer 'ded Up @

21:45 brs 302.5 m

1060 10.39

40

9.5

1I Drlg Fluids

Big Cheri[ Surface

Pump No. 1 Pop No. 2 Make National Masco

Model SP-$0 D-700 Liner 1 Stroke 159 a 203 203 z 406 SRI 48

Pulp Rate 2.38 13/Tin Pup Efficiency 90 t 'Pump Pressure 1200 kPa 1)rillpipe AV 36 m/min

Drillcollar A7 67 1/min Nozzle Veloc. 136 n/sec .Mud Cycle 27 tin Bottoms Up 6 tin

loud Tanks 50 13 Hole volume 14 13

System Vol. 64 a3 MUD ADDITIVES SURVEYS Gel Caustic Soda

Lignite Peltex Line

CaCl2 SAPP

'looser

Soda Ash Sawdust

Mud Check? Mud Daily Cost Mud Gun Cost

43 sz

lo $557 $3,293

0.25 @ 22 0.5 @ 50 0.8 @ 68

0.8 @ 96 1.6 @ 124

2.0 @ 152 2.3 @ 184

SHAKER MAKE Payne i Barris (dual shakers) SHAKER MESH 2 - 30 z 40 SOLIDS CONTROL

DfSILTER ,G.F. (4,'m3)

Vol (1/sin) O.F. (kg/m3) Hours

CENTRIFUGE

VOLUMES ktr Mauled

„ - to Fora.

1500 bbls

1i1

BOTTOMHOLE ASSEMBLY (No., Iten, OD, ID, TJ Type( mllmm hole opener

), rover,

r.:; Length nail FOB is DP in Hole

with 1.5a bulluose, morel DC, 15-DC's

110.41 m

bit sump, (171mmOD, 5190)

Hook Load Jts DP on Racks Jts DP on Location

3-EC (228amu3D,

25,000 dal 1114na, 4 1;2131 103

22,000 89 14

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Î Drill Tripping Rig Service Survey

Mipple BOP Pressure Test ,Condition Hole

Casing

Cement

Casing Bowl Rig Cp Tear Outs Slip Cut WOC Drillout Ott

2 3/4

1/2 1 3/4

Coring

Logging

DST Circ Samples

Rea' Ratbole Randle Tools

Rig Repair Reaming

2 1/2

16 1/2

Lost Circ

Rork Pipe

Fishing Wait on Orders

Total Hrs 24

BSPP kPa/SPN Max Csq Press

Calc Hole Fill

.Act Hole Fill

last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

SHOCK SUB ISM, Make, Days in Hole)

Spud €

Drl Out Shoe 4 Back Drip € 1st Log €

13:00 hrs 92-01-08 Surf TD €

Core Pt C ETD 4 Bit Stop Drlq 4 Rig Release @

24 HOUR SUMMARY

00.00 hrs 92-01-13. Continue POLO, run tultishot directional survey (use single shot tool and survey every stand) to 02:00 hrs. See Sperry Sun printout for survey summary (surface 1T) is $.5m away from surface veil center in a 161 irecti.on). Laid down locked up A stabilizers amd short DC's. Change BNI from 222m to 3111• bole opener, handle

KB, hole opener from 0 to 86 , survey to verify opener is Is to 04:30 hrs. learn hole amd open same to 311 86a

olloving pilot bole, to 12:00 hrs. Ream and open hole to 311w from 16 to 1$411®, survey as req'd, to 24:00 hrs 2-01-13.

i J' Strap ii ±Board Tally Measurement Made Corr.?

R07.1L; 1 14!12

DJ' Ir..Y II)I2TLLT Est G REP

WELL : 2-44.1IP ST-FLISINI L. I REPORI 1: d DATE: 92-01-15 fEPTH: 302.5 AB PROGRESS: Nil rotating hours (last 24 hours) ',ER @ 0800hrs: Ciro to Cement 245mm Surface Casing FORBAD: Wily LravdeA NUBILE NO.: (411) 721-3648 iAILY COST: $18,611 HOLE COND.: Pair/Good HEATHER: Rain/Snow TOOLPCSHER: Gerry OClet •'M COST: $356,630 CONTRACTOR: late' 1 TEMP.: -7 C T.P. MOBILE: (418) 721-2631 FORMATION: Surface K.B. ELEV.: 143.55 ■ ROADS: Very Poor MOBILE CHARNEL: 1/3 BIT PERFORMANCE DRILLING FLUID PUMPS Bit No. Sire (nn)

Mfg.

Type

Serial f Nobles From To

Bra on Bit

0AB (daN) RPM Condition Pulled for? Keters n;hr Cum Mrs

61

311 Security

Hole Opener

3-11.1 0

240 23.25 4-6000

100-160 4-4-I

Pea. late 240 10.3

Ream 23.25

71 311

Security

letup S33S 527663 3-15.9 240

300.5 9.25 10000

160 3-3-I

Surface TD 60.5

6.5 lean 32.5

Tile 'Depth

Density

Mud Gradient Vis PV

YP

Gels pH

Hater Loss 'Filter Cake Sand

22:30 bra

294 AKB

1090

10.69 60

9.0

' Pump No. 1 Pump No. 2 Rake National Bosco l Model IP-80 D-700 Liner Y Stroke 159 z 203 203 z 406 SPR 44

Pulp Rate 2.38 'Lain .Pump Efficiency 90 t i Pump Pressure 3000 kPa 'Drillpipe AV 36 nun flrillcollar AV 67 gun Jloxzle Veloc. 67 m'sec

,Solids Nail IPf,11f MST

Cl

Mud Cycle 31 min Bottoms Up 10 min Mud Tanks 50 m3 ; Hole Volume 23 n3 i System Vol. 73 13 1 MUD ADDITIVES SURVEYS

Cel Caustic Soda

Lignite Peltex time

CaC12 SAPP Alconer

Soda Ash

Sawdust

Mud Check? Mud Daily Cost Mud Cum Cost

23 sz

NO

$298 $3,591

Tote° Only

2 3/4 @ 244 3 @ 263 3 @ 282

3 1/8 @ 291

)

Ca

Salinity SHAKER RAKE Payne 6 Harris (dual shakers) SHAKER MESH 2 - 30 z 40 l

Mud Co.

Mud Engineer 'Mudded Up @

MI Drlg Fluids

Rig Check Surface

SOLIDS CONTROL DESILTER

C.F. ikg;'n3) CENTRIFUGE

VOLUMES Vol (1/sin) Cut Wtr Hauled Losses to Form.

2180 bbls Nil

0.F. (kg/13) Hours

BOTPOMHOLE ASSEMBLY (No., Iten, OD, I), TJ Type! Bit, bit sob, 3-DC (22to OD, 7090), (171m0)), 15-DC (170m0D), DP

BHA Length 178.32 m

looel DC

Hook Load 27,000 dal Avail WOB 22,000 Jts DP on Racks 88 1114®, 4 1 2311 Jts DP in Hole 12 Jts DP on Location 100

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill

Tripping Rig Service Survey

Nipple BOP Pressure Pest Condition Bole Casing

Cement

Casing Bowl

Rig Cp Tear Out Slip Cut

rillout Cut

4 1/2

1 3/4

1/4

Coring Logging DST

Cire Samples Ream Ratbole Handle Tools Rig Repair Rearing

1 1/2

16

Lost Circ

Work Pipe Fishing Wait on Orders

Total Hrs 24

RSPP kPa/SPM fax Csg Press Cale Hole Fill Act Hole Fill

Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

SHOCK SUB iS N, Kake, Days In Bole)

Spud €

1 Out Shoe €

el Drlg C. 1st Log €

13:00 hrs 92-01-08 Surf ID 4 Core Pt C. M) € Bit Stop Drlg € Rig Release P

23:15 bra 92-01-14

24 HOUR SUMMARY 00:00 brs 92-01-14. Opened 222mm pilot bole to 311mm with hole opener from 114 to 240m101, survey to confirm following pilot bole, to 07:30 brs. Penetration rate dropped off, POOH and strap out. Checked bole opener and found Cutters worn and bearings failed. Lay down bole opener. Make up Bit 17a. LID and strap in, freezing rain causing eztremely hazardous conditions around the rig, to 13:15 hrs. team and open up pilot hole to 311mm with bit frog 240 to 300.5mKB to 23:15 hrs. Circ and coed mud and bole to 23:30 hrs. Survey to 23:45 hrs. Dummy trip to DC's (4 stands) to '24:00 brs 92-01-14.

Mote: Visibility on roads 40m, rain turned to snow overnight in -4C temperature, gusty winds, working conditions slippery

rod harardous.

!Strap @ 240 m103 Board Tall, 239.95 m Measurement 239.92 n [Made Corr.? 0.03a Doff, b SOQ8DR08.YLS 1.15 92

ENERCON ENCTNIERING LTD.

soc,~u ~ Ils DAILY I3R S LLS NG IZF,PORT

WELL: SOQOIP ST-FLAYIEI 10. t REPORT l: 9 DATE: 92.01-16

'DEPTH: 302.5 NZ PROGRESS: sin rotating hours (last 24 hours)

pm € OaOOhrs: tipple up BOP's FOREMAN: Will Krawde c MOBILE NO.: (411) 721-364$ )I1LY COST: $4$,825 ROLE COND.: Cased WEATHER: Clear TOOLPCSHER: Gerry Oairet 1

JCLM COST: $405,455 CONTRACTOR: tales 1 'HIP.: ' -24 C T.P. MOBILE: (418) 721-2611

FORMATION: Surface K.B. ELEV.: 141.55 m ROADS: Icy MOBILE CHANNEL: 1/A I

•HIT PERFORMANCE DRILLING FLUID PUMPS

Bit No. Size (0)

Mfg.

Type ✓Serial t Nozzles From

to Hrs on Bit WOB (daN)

RPN

{Condition Fulled For?

deters )a hr Ca Hrs

/Time depth lD~ensity

Mild Gradient Vis PV

'YP Gels p8 Water Loss Filter Cake

Sand Solids

Oil Pf 71f MBT

tl Ca Salinity Mud Co.

Mud Engineer Mudded Up @

10:00 hrs 301 a 1090

10.69 60

9.0

M1 Drlg Fluids

tiq Cheer Surface

Pump No. l Pump No. 2 Make latioeal Kisco Model 11P-80 D-700 Liner Y Stroke 159 z 203 203 z 406 SAN

Pump Rate 13,'Iin Pump Efficiency 3 Pulp Pressure kPa Drillpipe AV a/min

llrillcollar AV again Nozzle Veloc. [;sec

Mud Cycle tin

Bottoms Up min Mud Tanks 33 Hole Volume 13

System Vol. 13 MUD ADDITIVES 'SURVEYS Gel Caustic Soda Lignite

Peltex Line

CaC12 SAPP Alcouer

Soda Ash

Sawdust

Mud Check? Mud Daily Cost Mud Cue Cost

1b

$0 $3,591

SHAKER MAKE Payne i Harris (deal shakers)

SHAKER MESH 2 - 30 z 40 SOLIDS CONTROL

DESILTER C.F. (kg/131

Vol (1(min)

O.F. (kg/13) Hours

CE]ITRIFCGE

VOLUMES ✓Glen kits Hauled Losses to Fors.

2330 bbls lil

BOTTOMHOLE ASSEMBLY (No., Item, OD, ID, T3 Type1

BHA Length

A'rail WOB Jts DP in Hole

Hook Load Jts DP on Racks Its DP on Location

daN

(1140, 4 1'217[) 100

100

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL 'Drill

Tripping Rig Service Survey

,Nipple BOP

&Pressure Test (Condition Hole [Casing

Cement

Casing Bowl

Rig Up 'Tear Out Slip Cut WCC Drillout Cat

3 1/2

1 1/2 4 1/2

1 1/4

1/4

12

Coring Logging CST

Circ Samples Rear Rathole Handle Tools

Rig Repair leaning

Lost Circ Work Pipe Fishing

Wait on Orders Start Cement

Truck

Total Hrs

J

1

24 ,'Graveyard

RSPP kPa/SPH Max Csq Press Calc Hole Fill Act Hole Fill

Last BOP Drill:

Daylight Crew Afternoon Crew

Crew

SHOCK SUB IS N, Make, Days in Hole(

Spud C Tyr) Out Shoe € Back Orla €

1st Log Ê

13:00 hrs 92-01-04 Surf TD € Core Pt € FTD € Bit Stop Drlg € Rig Release €

24 HOUR SUMMARY 00:00 hrs 92-01-15. Daisy trip 4 stands. Circ and coed sud and bole for 1/2 hr. POOH and strap oat. Lay down

3-2210 DC's to 04:00 hrs. fig up tiq Service Bgnipacet power tongs and ran 23 its of 244.50, 43.07 kg/a, ST&C, IT 3, I-40, Ipsco casing to 01:30 hrs. Circ casing to 09:30 hrs. Rig np low= Canters. Mad probleu starting notor

on paper due to cold weather conditions to 10:30 hrs. Ceaeet surface casing with 21 tomes 0-1-0 Class G + 21 CaC12. Displaced with water and had 5.0 s3 good must returns to 11:45 hrs. Wait on cement to 23:45 hrs. Cut coedector barrel

to 24:00 hrs 92-01-15.

trap € 300.5 mKB JBoard Tally 300.50 s pleasureoent 300.39 I Nade Corr.'. 0439. Jiff, to SOQaDR09.]IS 1 1G,92

SQQ[JI ]P I]ATLY DMLING REPC]I2a` REPORT i: LD DATE: 92-01-I'

DEPTH 302.5 on PROGRESS: Nil rotating hours (last 24 hours)

OPER C 0800hrs: Winterizing Iauifold after Pressure Test FORMAN: Will Krawdbuk N OILE NO.: (411) 728-3648

DAILY COST: $17,401 BOLE COND.: Cased WEATHER: Clear TOOiPGSBER: Gerry Ouiaet

CEll COST: $422,856 CONTRACTOR: Rolex 1 TEMP.: -26 C T.P. MOBILE: (418) 711-2631

FORMATION: Surface R.B. ECU.: 143.55 a ROADS: Fair MOBILE CHAINEL: I/A

BIT PERFORMANCE (DRILLING FLUID PUMPS

Bit No. Size lam)

Kfq. Type

Serial 1 Nozzles

From

To ers on Bit

icOB (dal()

'RPM Condition Pulled For? Meters

n,'hr Oa firs

Aline

,.Sand

r)eeoth 'Density

ud Gradient

%is An'

'YP (Gels

71I

»ater Lass Filter Cake

solids

aDil

1,f,'Mf In

14:00 hrs 300 W3

1050

46

1.5 10.0

1.5 an

Pump No, 1 Pup No. 2

Kake National Basco

Model 8P-80 D-700

Liner X Stroke 159 s 203 203 r 406

,SPN

Pump Rate al/tin

Pump Efficiency 1

Pump Pressure kPa Drillpipe AV a/110

Drillcollar AV midn

3lotzle Veloc. n/sec

0.1/0.3

200 40

II Ding Fluids

Surface

Olud Cycle sin Bottoms Up sin Mud Tanks n3 Role Volume n3

System Vol. 13 MUD ADDITIVES SURVEYS Cl

Gel Caustic Soda

Lignite Peltex Line

CaC12 SAPP -.leaner

Soda Ash Sawdust

Mud Check? ltud Daily Cost Mud Cue Cost

Yes $450

$4,041

Ca

Salinity

Mud Co.

.Mud Engineer Mudded Up t

SHAKER (LAKE Payne i Harris (dual shakers)

MAKER MESS 2 - 30 r 40

SOLIDS CONTROL DESELTER

t.F. (kg i3)

Vol (14in)

O.F. Ikq;m3) Hours •

CENTRIFUGE

VOLUMES vC3[a Wtr Hauled .Losses to Forn.

2570 Nils Iii

BOTTOMHOLE ASSEMBLY (No., 'ten, OD, ID, TJ Type)

1. Length =wail 00B is DP in Hole

Book Load

Jts DP on Racks Jts DP on Location

daN (!Una, 4 1:'21K) 100

100

DRILLING OPERATIONS TIKE BREAKDOWN WELL CONTROL

Drill

Tripping Rig Service Survey

Nipple BOP Pressure Test Londition Hole

sing

Cement

leg Bowl Fig Up Tear Out

S1 ,, Cut ~vpC

IDrillout Cut

14 1/2

1 1/2

Coring Logging

DST Circ Samples Ream Rathole Handle Tools

Rig Repair

keauing

Lost Circ work Pipe

Fishing Wait on Orders

Cut Casing Thaw out Rig

Total firs

1 7

24

KSPP kPa/SPN

Max Csq Press Calc Bole Fill Act Bole Fill fast BDP Drill:

Daylight Crew Afternoon Crew Graveyard Crew

SHOCK SUB CS N, Make, Days in Hole)

,Spud € I 13:00 tits 92-01-08

Drl Out Shoe t I

Back Ong € i

1st Log t

I

Surf ID C Core Pt E

;FTO t iBit Stop Drlq t

!Rio Release t

24 HOUR SUMMARY 00:00 hrs 92-01-16. Cut off Coodector barrel and casing to 01:00 hrs. Weld on casing bowl using

pressure test weld with water to 7000 kPa, held OK, to 02:30 hrs. Pick up and assemble OOP's

service and testing) to 08:00 Ars. lad pump circulating mud tbrougo kelly and kelly sock.

, shut pump dove to thaw out lubricator, tried to kick in pomp and found mud lines had frozen

wily hose and and lines to 15:00 hrs. It appears that the boiler is too small for this kind

Cher conditions. led van was called to location to check mud properties for Poly-Plus polymer

the surface casing shoe). Coitinaed to eipple op the BOP's, kill line and Ranifold lines. leedoff lines to latch BOP ceefiguratioo Won the bottee up - casing bowl, pipe rams, drilling

up hydril actuator lines. Accumulator sow running. Start to check function of BOP controls

preheat and postheat, ry ~ (completely apart free

Lubricator on pup froze up. Thaw out standpipe,

of steam demand during cold and up procedure (for Had to rebuild kill and

spool, blind ram, hydril). to 24:00 tirs 92-01-16.

,Strap i': SOoaDkIO.YLS 1;17,92

[Board Tally Measurement sae corr.. ENERCON ENGINEERING LID.

~30QiJ T 1~ II)ATI..Y IL712:I I,ING I2 )CPpRT WELL: SOQO[P ST-FLAVIES E. 8 REPORT t: 11 DATE: 92-01-16 EPTH: 304.6 nKB PROGRESS: 2 ■ in 1 4 rotating hours (last 24 hours)

'PER @ 0800hrs: Drlg 2221E Bole of Locked Op BHA E 31411KB FOREMAN: Yi1f Krawdahk MOBILE NO.: (418) 728-3648 GAILY OOST: $10,742 BOLE COIN.: Good WEATHER: Light Snow T00LPVSHER: Gerry Oai.et I COST: $433,598 CONTRACTOR: tales 1 TEMP.: -20 C T.P. NOBILE: (418) 721-2631

FORMATION: Top Sole K.B. ELE'..: 143.55 ■ ROADS: Fair MOBILE CHANNEL: 14/1, BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No.

Site t®I

Mfg.

Type

Serial t Nozzles From

To Bra on Bit WOB (deal RPM Condition

Pulled For'

Meters o ur 11m Hrs

1 L!

222 teed

S-21G-,R

11-3451 3-11.1 302.5

304.6 0.25

5000 70

Good mange ffi

2.1 8.4

0.25

fire

)epth nsity

Xud Gradient , .'is 97

YP

Gels

PO Water Loss

Filter Cake Sand Solids Oil

,Pf llf 'NET

Cl Ca

Salinity Mud Co. Mud Engineer Mudded Cp 4

21:00 hrs

301 1KB

1040

10.2

36

11.0

BI Drl; Fluids Itig Died 301 m1Z

Pulp No. 1 Pump No. 2 Make National Casco Model 8P-80 D-100 Liner X Stroke 127 x 203 140 a 406 SPX 120

'Pup Rate 0.93 13/tin Pump Efficiency 100 t

Pressure 2000 kPa ' illpipe 1V 33 r/rin Drillcollar 17 58 slain Jorzle Veloc. 53.5 m/sec Mud Cycle 67 min Bottoms Cp 10 min Mud Tanks 51.5 m3 Hole volume 9.5 13

S;sten Vol. 62 a3 MUD ADDITIVES SURVEYS Gel Caustic Soda

Lignite Peltex Line

CaCl2 SAPP .)comer

Soda Ash

Sawdust Bicarb

Mud Check? Mud Daily Cost Mud Co Cost

16 si

In

$260 $4,301

SHARER MAKE Payne i larris (dual shakers) SHAKER MESH 2 - 30 s 40 SOLIDS CONTROL

DESILTER (C.F. (kg a3)

Vol (0in) O.F. (kg/13) Hours

CENTRIFUGE

VOLUMES Cum wtr Hauled Losses to Form.

2720 bbls Bil

BUTTONHOLE ASSEMBLY (No., Iten, OD, II), i'J Type) Bit, bit sub, 1-Boael

BHA Length

1-:ail WOB Jts DP in Hole

DC (1711000,

149.26 a

5190), 15-DC's

Book Load

Jts DP on Racks Jts DP on Location

(170nn0D, 511901

25,000 daN

(114on, 4 1,2121 100

16,000 84 16

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Ser7ice Survey

Nipple BIP Pressure Test Condition Bole Casing

Cement

Rig Up Tear Out

Slip Cut

aCC Drillout Cat

Casing Bowl Spud

1/4 3 1/2

2 1/2 6 3/4 1

5 1/4

Coring Logging DST Circ Samples

Ream Rathole Handle Tools Rig Repair Reaming

2

Lost Circ Work Pipe Fishing

Wait on Orders Press 1st Test Winterizing BOP Drill Total firs

1/2 1 1/2 3/4

24

RSPP kPa/SPN Max Cog Press

Calc Hole Fill Act Hole Fill Last BOP Drill: Daylight Crew

Afternoon Crew Graveyard Crew

3840 kPa 2.7 a3 2.76 13

92-01-17 92-01-18

SHOCK SUB (S 1l, Make, Days in Hole)

1 Out Shoe t Bak Drag @

1st Log @

13:00 hrs 92-01-08

19:45 hrs 92-01-17 Surf Ti) @

Core Pt @

YID @

Bit Stop Drig @ Rig Release @

24 HOUR SUMMARY '':00 hrs 92-01-17. Work on Swaco choke, could not repair seised parts, will get new choke. Function remote BOP .., trols to 02:30 hrs. Press test blind rams, JCL valve, wing valves, lines and waif old valves to 1400 kPa low and 7000 !.•• high for 10 min. each, repaired leaks, then held OK to 07:00 hrs. Blow out lines and winterised manifold and lines with

tifreese to 08:30 hrs. Bade Dip bit, strap and steam out all DC's and DP. RIB, tagged anent top at 27beKB, to 11:00 !. . Installed stabbing valve and circ to L1:15 hrs. Press test hydril, pipe rams, stabbing valve, and telly cock to 1400 kPa low and 7000 kPa high for 10 ail. each, held OK, to 12:30 hrs. Ciro, held BOP drill and safety meeting w/ crew to 13:15 !• . Drill out meat and float (cement hard) to 16:00 hrs. Press test 2 shoe its of casing to 7000 kPa, held OK, and check

for kills to 16:30 hrs. Drill out cement to 18:30 hrs. Condition crest-comtaadnated sod to 19:15 hrs. Drill out 31 .- :.,t and 2n below casing shoe to 20:30 hrs. tun formation integrity test to 23 kPa/m gradient, held OK for 10 .in. to 21:00 hrs. PCOB Pick op locked up NBA, caliper and ensure sa0e to 24:00 hrs 92-01-17.

Strap t Board Tally Neasureoent Nadi Corr.? S0Q8DR11.XtS 1;1892 ENERCON EMCINFIRINO LT~

S4JQLl 2 M?

T72‘ = LY DR = LL S NG R EPQRT

WELL: 93001P ST-FLUV1d E. 8 REPORT I: 12 DATE: 92-01-19 DEPTH: 358 a103 ND PROGRESS: 54 m in 17 1/2 rotating hours (last 24 hours)

OPER @ OSOOhrs: Directionally Drill 22216 Bole @ 40380 MD FOREMAN: Wilt Rrawcbuk MOBILE I10.: (411) 72$-3648

DAILY COST: $25,676 MOLE CORD.: Good WEATHER: Clear TO)LPUSBER: Gerry Owlet

COST: $459,271 CONTRACT01: Molex 1 TEMP.:1CFLIOX

-24 C T.P. MOBILE: (418) 721-2631

RNATION: Quebec City R.B. ELEV.: 143.55 m ROADS: Icy MOBILE CHANNEL: I/A

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No. Size (an) Ifq. Type

Serial f

Nozzles

Pula To

Ors on Bit NOB (dal)

RBI Condition

Pulled For? %Meters

'.K/hr Cum firs

1 RR 222

teed S-21G-JR

LI-3451 3-11.1

302.5

340 15.00

4-5000

60-160 4-3-F

Change BRA 37.5

2.5 15.00

2 222 Reed

HP-43À-JR 100819 3-11.1 340

358 2.50

5000 60

Drilling

18 7.2 17.50

•iee

i th ' nsity

. Gradient

is

is

ater Loss liter Cake •. d

...lids

.il • /Mf +:

1

•.linity ud Co. ud Engineer udded Up @

22:00 hrs 344 a 1045 10.25

51

11.0

MI Drlq Fluids Rig Check 301 WICB

Pump No. 1 Rap No. 2 Rake Rational Emsco Nodel 8P-10 D-700 Liner X Stroke 140 s 203 140 x 406

SPN 120

Pup Rate 1.1 0/sin

Pump Efficiency 100 t Pump Pressure 5500 kPa Drillpipe AV 39 a/sin Drillcollar AV 70 a/min Nozzle Veloc. 63 a/sec Mud Cycle 56 Kin Bottoms Up 10 min Mud Tanks 50 0 Hole Volume 11 .3

System Vol. 61 0 MUD ADDITIVES SURVEYS Gel Caustic Soda Lignite

Peltex ,Lime

CaC12 ,SAPP Alcomer

(Soda Ash

'Sawdust Poly Plus

?fad Check?

'Mud Daily Cost ]zud Cum Cost

23 sr

8 pails

No

$2,104 $6,405

3.6 @ 314

3.7 @ 324 3.6 @ 333

SHARER MAKE Payne E Harris (dual shakers) SHAKER MESH 2 @ 60 x 80 SOLIDS CONTROL

DESILTER

O.F. (kg/s3) Fisher De-Watering

o1 (1/min) Operating

.F. (kg/a3) ours

CENTRIFUGE System

VOLUMES Wtr Hauled

I • •s to Fora. 2870 bbls

Nil

BOTTOMHOLE ASSENBLY (No., Item, OD, ID, TJ Type) :it, Media; Speed

..., x-over sub, is , 3-DC's, Jars, ,.: Length wail NOB is DP in Hole

1710 Sperry

1-Wonel DC, Hang12-DC's, x-over 172.95 ■

Drill Rod Rotor

-Off Sub (c/w sub, DP

Hook Load its DP on Racks its DP on Location

c/w 1 deg B8 1

IND probe and pulser),

27,000

216ma screw-on 1-Nobel

daN (114., 4 1/2111) 100

17,000 81 19

DRILLING OPERATIONS TINE BREAKDOWN WELL CONTROL

")rill %'ripping tRiq Service

Survey -Nipple BOP

Pressure Test ;Condition Hole ,Casing

LCement

Casing Bowl `Ric Up/Tear Out

Slip/Cut I440C 1Drillout Cat

15 4

3/4

Coring Logging DST

Circ Samples Rees Rathole

Handle Tools

Rig Repair leasing

3 3/4

Lost Circ

Work Pipe Fishing

Wait on Orders Orientating

Total Hrs

1/2

24

,,Act

RSPP kPa/SPN Nax Csq Press Case Role Fill

Bole Fill fast BOP Drill:

f)aylight Crew

(Afternoon Crew Graveyard Crew

1800 @ 60 3140 kPa

3.81 al

3.90 0

92-01-17 92-01-18

SHOCK SHE (S/N, Make, Days in Hole:

Spud @ Dri Out Shoe @

Back Drig @

1st Log @

13:00 hrs 92-01-08

21:30 hrs 91-01-18

Surf TD @ Core Pt @

FID @ Bit Stop Ong @ Rig Release @

15:30 hrs 92-01-18

24 HOUR SUMMARY :00 hrs 92-01-18. RIB with locked-up BHA. Waited 15 min. for jars to fire. Continue RIB to 02:15 hrs. Ream trou 2%

o 3041KB to 02:30 hrs. Drill ahead 222a sain hole with locked-up BRA fro. 304 to 34003, rotate slowly while

tabilirers inside casing, survey with single shot IOL every single, to 15:30 hrs. POOH and laid down stabilisation. Picked

medium speed Sperry-drill mud motor and Nib tools, III to 21:00 hrs. freak circ and orient tools, calibrate

'nutmeats to 21:30 hrs. Directionally drill 222em main hole with sud motor, alternately set (no rotation) and rotate BRA, rom 340 to 358mKB ND to 24:00 hrs 92-01-11.

strap @ Board Tallymeasurement (Made Corr.? /9

S OQ U I P DAILY dit:LI,I.ING nm?ORT WELL: SIQDIP sr-FLAVIIID ID. 1 DEPTH: 471 11B MD PROGRESS: 113 m

OPER @ O804hrs: Directionally Drill 222mm Mole @ 526111 MD

DAILY COST:$33,411 HOLE COND.: Good

REPORT f:

in 19 1.2 FOREMAN:WEATHER:

11 DATE:

rotating hours hast 24 hours)

lilf Krawchuk MOBILE NO.:

Clear TOOLPCSHER:

92-01-20

(411) 728-3648

Gerry Guimet

CUM COST: $492,685 CONTRACTOR. lalei 1 TEMP.: -19 C T.P. MOBILE: (418) 728-2i,31 •

FORMATION; Quebec City K.B. ELEV.: 143.55 m ROADS: Icy MOBILE CHANNEL: l/1 1 , BIT PERFORMANCE \DRILLING FLUID PUMPS

Bit No.

Size (mm) Mfg.

Type

Serial 1 Nozzles

From To Mrs on Bit

)38 (daM) RPM Condition Pulled For? Meters

D hr Cum Hrs

2

222 teed

1P-431-J1

100819

3-11.1 340

471 23.00 5-$000 120/180

Drilling

131 5.7 37.00

`Gels

Tile Depth Density

Mud Gradient

lis

PV YP

pH Water Loss Filter Cake Sand

Solids 411 Pf Mf 103E

Cl Ca

Salinity

Mud Co.

Mud Engineer Mudded Cp @

23:30 bra 468 ■

1050

10.3 46

10.5

Pump No. 1 Pump No. 2 1i

Make Iatiomal Cisco )model îP-80 D-700

Liner X Stroke 140 z 203 140 1 406

5PM 120

Pump Rate 1.1 131lin Pup Efficiency 100 3 Tump Pressure 5000 kPa

Drillpipe AV 39 ./.in

i)rillcollar AV 70 ails Nozzle Veloc. 63 a/sec

MI Drlg Fluids

lig (beck 301 1101 )î.F.

Mud Cycle 59 tin

Bottoms Op 13 min Mud Tanks 50 a3 Hole Voluse 15 53

System Vol. 65 n3 MUD ADDITIVES SURVEYS

Gel

Caustic Soda

Lignite Peltex Lime

CaC12

SAPP Alconer

Soda Ash Sawdust Gypsum

Mud Check? Mud Daily Cost Mud Gun Cost

28 sI

1 sk

2 sz

to

$1,737 $8,142

3.61164 @ 339 3.8154 @ 344

4.2111 @ 358 4.7181 @ 367 4.4181 @ 376

3.6111 @ 316 2.8134 @ 395 2.01484 @ 404

1.81114 @ 414

1.71234 @ 423 1.51374 @ 432 1.31474 @ 443

1.11.104 @ 452

1.11594 @ 462

SHAKER HAKE Payne i Barris (dual shakers)

SHARER MESH 2 @ 60 110

SOLIDS CONTROL OISILIER

(kg/m31 Fisher De-Metering

Vol (l:ain) Operating

O.P. (kg/a3) Ilours

CfTRIFIGE

System

VOLUMES Cun it' Hauled Losses to Fors.

3020 bbls Iii

BOTTOMHOLE ASSEMBLY (No., Iten, OD, ID, TJ Type)

1Bit, ledimw Speed

pad, i-over sub, DC, 3-DC's, Jars, BHA Length

Avail WO$ Jts DP in Hole

17111 Sperry

1-lonel DC, Rang12-DC's, I-over 174.35 r

Drill lad motor -Off Sub (c/w

sub, 15111m Tapered Hook Load

Jts DP on Racks Jts DP on Location

c/w 1 deg B1 i 1® probe and pulser),

Blade Reamer,

29,000

216x• screw-on 1-lonel

DP

dal( i114an, 4 1 21111 100

17,000 69 31

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill

Tripping Rig Serice

Surey Nipple BOP Pressure Test Condition Hole Casing

Ceoent

Casing Bowl Rio Cp Tear Out

Slip Cut

viOC

Drillout C1t

19 1/2

1 1/2

3

Goring

logging DST Circ Samples Ream Rathole

Handle Tools Rig Repair Reaming

Lost Circ

Work Pipe

Fishing Wait on Orders

Total Hrs 24

RSPP kPa;SPM

Max Csq Press Cale Hole Fill

Act Hole Fill Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

1800 @ 60

3810 kPa 1.30 m3

1.34 al

92-01-17 92-01-18

SHOCK SUB ES N, Make. Dais in Hole) Mason Jars, 2 days

Spud €

Dry Out Shoe € Back Drlg € 1st Log €

13:00 ùi5 92-01-08 Surf TD

Core Pt € LID € Bit Stop Drla €

Rig Release

24 HOUR SUMMARY

00:00 brs 92-01-19. Continue directionally drilling 222am main hole with mud motor and NMI) surveying, set and rotate to

termine which combination will drop bole angle, 5000 dal N0B, from 358 to 4272RM 1ST to 12:00 ors. Directionally drill

from 427 to 4481IB to 17:30 hrs. Dummy trip to check for tight spots and bole drag, bole good. Pulled out to DC's and

installed tapered blade ream at top of DC's. III to 19:00 hrs. Directionally drill ahead with mod motor and Il) from

448 to 471103, increased NOB from 5000 dal to 8000 dal to see if bole angle could still be controlled, to 24:00 tirs

2-01-19.

dote: Boiler too small to rim rig, Fisher de-watering system and thaw Sperry pulse sensor in cold weather. Swaa choke

!wa rebuilt, installed and working.

trap € J(i,c. R 1

Board Tally Measurement Made Corr.'

EN! COK ENGINEERING LTD.

IDAI_ L.Y 1aulD.ORT WELL: 90Q0IP sr-FIAVI17î 10. 8 REPORT I: 14 DATE: 92.01-21~ !EPTH: 548 t141 ID PHOORESS: 117 a in 19 1 2 rotating hours (last 24 hours)

'PER @ 0800tus: 111 w/ Locked-Up 111 to Tear to 599m FOREMAN: lilt Fsawchuk MOBILE MO.: (418) 728-3648

i► AILY COST: $33,644 BOLE COND.: Good WEATHER: Clear TOOLPCSEER: Gerry Ouivet

'M COST: $526,329 CONTRACTOR: Rolex 1 TEMP.: -17 C T.P. MOBILE: (418) 7281.2631

FORMATION: Quebec City K.B. ELEV.: 143.55 m ROADS: ICy MOBILE CHANNEL: N/1

BIT PERFORMANCE [DRILLING FLUID )PUMPS

:it No. ire (me)

:fq.

ype erial 1

: ortles From o

r on Bit

(dal) RPM ondition

r led For?

1 eters . ,ltr . Brs

2 222 Reed

11P-431 -JR 800119

340 SU

41.50 5000

120/180 Drilling

248 6.0 56.50

1.1

rte

s-•th l-nsity . Gradient

I•'ts

-ls

p: .ter Loss

.Filter Cake

'••. • .lids

)oil • If :::T

1

! a

• unity

1 • Co. Engineer

I •ded Cp @

1-11.1

23:30 hrs

516 m 1050

10.3 46

10.5

10.4 l+

M Dig Fluids•SOLIDS Pig Cbedt 301 mNB

Pump No. 1 Pump No. 2

Ake National Imo

odel SP-80 D-700

finer X Stroke 140 x 203 140 i 406

PM 120

:' 0 Rate 1.1 m3min 0 Efficiency 100 t

: : Pressure 5000 M'a

iilpipe AV 39 miain

u illcollar AV 70 •,Iin •tzle Veloc. 63 a;seC

ud Cycle 62 min

ttoms Cp 17 tin

• Tanks 50 t3

~ uole Volume 18 n3

;stem Vol. 68 n3 MUD ADDITIVES SURVEYS

Gel Caustic Soda Lignite Peltea Lime

CaC12

SAPP _lcomer

Soda Ash Sawdust

SBA II

Poly Plus Nud Check?

Mud Daily Cost Mud Cum Cost

2 pails

4 pails No

$1,075 $9,217

1.11601 @ 471

1.61591 @ 480 1.81166W @ 490 2.O1651 @ 499 2.71641 @ 509

2.806811 P 518

2.71741 8 528 2.61851 8 537

2.6578E8546

2.45613 @ 555 2.79481 8 565

' 2.1S41W 8 574

SHAXER MARE Payne i Harris (dual shakers) SHAKER MESH 2 @ 60 z 80

CONTROL

DESILTER

.F. (kg/t3) Fisher De-Watering

Jol (1/min) Operating

F. (kg/m3) ours

CENTRTFCGE System

VOLUMES .- Wtr Hauled

4 •, to Form. 3395 bbls

Ell

BUTTONHOLE ASSEMBLY (No., Iten, CO, ID, TJ Type)

t, Median Speed ,.-•, s-over sub,

, 3-0C's, Jars,

:::- Length ?,ail in is DP in Hole

171zî Sperry 1-Nonei DC, Hang

12-DC's, s-over

174.35 m

Mill Ind Notor

-Off Sub (c/v sub, 184mm Tapered

Hook Load Jts DP on Racks Jts DP on Location

c/v 1 deg II 6

î1D probe and pulser), Blade Reamer,

30,000

2161 scree-on

1-Notel

DP daN

(114®, 4 1722) 100

17,000 57 43

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping Rig Service

Survey Nipple BOP Pressure Test Condition Bole Casing

Cement

Casing Bowl Rig Up Iear Ou Slip Cut 4

u illout Cut

19 1)2

1/2

4

Coring Logging DST Circ Samples

Ream Rathole Handle Iools Rig Repair Reaming

Lost Circ Work Pipe Fishing Wait on Orders

Iotal Mrs 24

,RSPP kPaSPM 'Now Csg Press

Calc Bole Fill Act Hole Fill Last BOP Drill: Daylight Crew

Afternoon Crew Graveyard Crew

1000 8 68 3810 kPa

92-01-17 92-01-18

[SHOCK SUB IS N, Make, Days in Hole l Nason Jars, 3 days

Spud €

DTI Out Shoe € Back Drlg €

1st Log t

13:00 hrs 92-01-08 Surf ID @ Core Pt t

ETD R 1Bit Stop Drig @ 1Rig Release K

24 HOUR SUMMARY

m':00 hrs 92-01-20. Directionally drill with medics speed rod motor and I D surveys, orient, set (slide without drill string otation) and rotate as req'd to lower hole angle, from 471 to 5154B ID to 06:00 hrs. Rig sere and function pipe rams to

~.:15 hrs. Directionally drill to control hole angle, MD survey as reg'd, from 515 to 543MKB ND to 12:00 hrs. lirectionally drill to control bole angle, NOD survey as req'd, from 543 to 5UVB ID to 23:45 hrs. Rig sere and function

i.ydril to 24:00 hrs 92-01-20.

Strap C [Board Tail} [Measurement [Made Corr.? 14. 2

17A_i l.Y 1772r I..T~rNG R7?T~C~7l2T

WELL: S0201P ST-FLAVIEI 10. I REPORT $: 15 DATE: 92-01-22

DEPTH: 599 1KB N1 PROGRESS: 11 ■ in 3 1,2 rotating hours !last 24 hours!

OPER € 080ohrs: PODD After leaning Lock-Up III to Bottom FOREIL;N: Milf Krawchuk MOBILE MO.: (411) 728-3641

DAILY COST: $23,161 BOLE COND.: Coud WEATHER: Clear T00LPCSBER: Gerry Ouimet

CUM COST: $549,690 CONTRACTOR: !ales 1 TEMP.: -12 C T.P. MOBILE: (411) 728-2631

FORMATION: Quebec City K.B. ELEV.: 143.55 a ROADS: Icy MOBILE CHANNEL: 1/A

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No. Site Inn) Mfg.

Type

Serial 1 Mottles From To

firs on Bit WM (dal)

RPM condition (Pulled For? Meters

,n'hr Cun firs

2

222 teed

IP-43A-JI 10819

3-11.1 340

599

45.00 5000

120

2-2-0 1/8 tearing 259 5.8

60.00

leaning 222 ii feed

ID-12-311 11 121 3-11.1

340 497

11.50,•:

4-5000 i 100-120

haling

157

13.7 team 11.5

ire .th

►-nits ud Gradient is

P

-Is

.ter Loss Filter Cake

•• ....lids 'il . If r:T

Cl Ca

Salinity Mud Co. Mud Engineer ]Budded Cp €

22:00 Ors 4S6 a 1050 10.3

43

10.0

10.8

II Orlg Fluids

Rig Check 301 mK9

Pump No. 1 Pump No. 2 Make National Ivaco Model 0-10 D-700 liner 1 Stroke 140 z 203 140 s 406 SR 120

Top Rate 1.1 m3;ain

'Pump Efficiency 100 t

'Pulp Pressure 5500 kPa

1)rillpipe AV 39 main

Drillcollar AV 70 mein

Iotole Ve1oc, a!sec

Aid Cycle 64 min

flottons Cp 17 ado

Mud Tanks 52 n3 Hole Volune 19 13

System Vol. 71 p3 MUD ADDITIVES SURVEYS

Gel

Caustic Soda Lignite

Peltex Lime

CaC12

SAPP ;lcoaer

,Soda Ash Sawdust SEA II Poly Plus

Mud Check?

hlud Daily Cost Mud Cun Cost

2 pails No

$452 $9,669

SHAKER MAKE Payne i Barris (dual shakers) MAKER MESH 2 H 60 z 80

SOLIDS CONTROL DESILTER

.F. (kg/n31 Fisher De-Watering

'Vol I1/ainl Operating

P.F. (kg;a3) lours

CENTRIFCGE System

VOLUMES

pza itr Hauled ,Losses to Fora.

3620 bbls Nil

BOTTOMHOLE ASSEMBLY INC., Item, OD, ID, TJ Type!

Sit, MIS, 2-lES,

'tapered blade reamer,

. Length

e.7ail WOB Tts DP in Hole

short DC, 2-IIiS, DP

156.35 1

3-OC's, Jars,

Hook Load

Jts DP on Racks Jts DP on Location

12-DC's, r-over,

30,000 dal (114:m, 4 1:21Hj 100

17,000 57 43

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill

Tripping Rig Serice

Surrey

Nipple BOP Pressure Test Condition Hole iCasing

Cement

Casing Boil

Rig Cp Tear Ouÿ

Slip Cut

WOC

Drillout Cut

3 1/2 4

1/2 1/2

1

Coring Logging DST

Circ Samples

Ream Rathole

Handle Tools Rig Repair Reaping

3

11 1/2

Lost Circ Iiork Pipe Fishing Wait on Orders

Total firs 24

RSPP kPa SPM

'Max Csq Press Calc Hole Fill Act Hole Fill

Last BOP Drill: Daylight Crew

Afternoon Crew Gra-.eyard Crew

1000 p 61 3810 kPa

4.66 13

4.80 13

92-01-17 92-01-18

SHOCK SUB IS N, Make, Days in Hole! Mason Jars, 4 days

Spud € 13:00 hrs 92-01-08

)7,r1 Out Shoe €

Back Brig €

1st Log €

Surf TD €

Core Pt C.

FTD €

Bit Stop Drlg E

Rig Release €

04:00 hrs 92-01-21

24 HOUR SUMMARY 00:00 Ors 92-01-21. Directionally drill 222mn nain bole with mad motor and IND surveys, orient as req'd to maintain

(straight hole, from 581 to 5996103 ID to 04:00 Ors. POOR to pick up stiff BRA to ream out all dogleg.. Function blind

trans. Pick up and make up locked-up BRA. changed out jars (this set appeared not to be working). Sew jars were run in

with 3 DC's below then but did not appear to fire. Checked travel and they should have fired. Will run then in and check

0r-unction coning off bottom. III to 10:30 Ors. Slip and cat drilling line to U:30 hrs. III to 12:00 hrs. Rig sere and

ion pipe rams to 12:15 hrs. teas directional bole out with locked-up BRA Ito prevent hole problems further down the

le) fro. 340 to 497NKB ND. Tried different OM and U11 but found that anything over 5000 dal and 120 1PR gave

cry rough drilling (even parted the rotary table chain). At lowered IPM and 1KM the torque varied from 0 to 200 ft-lbs

{with smooth reaming to 24:00 hrs 92-01-21.

L strap € [Board Tally IMeasurenent INade Corr.'. J

.ILS 1 22'92

L1U.

L)12 .1- 1.1 .1 NG 12Iv:IpC>IZ'I"' WELL: SOODIP ST-FLAV1EN ND. d REPORT is 16 DATE: 92-01-23

DEPTH: 640 sKB ID PROGRESS: 41 ■ in 9 rotating hours (last 24 hours(

OPER € OBOOhrs: Directional Brig 222m Sole ! 6750KB ID FORDO: Wilf Lravchuk MOBILE HO.: (411) 726-3648

DAILY COST: $38,603 HOLE COND.: Good WEATHER: Clear TOOLPUSBER: Gerry Whet

CUM COST: $588,293 CONTRACTOR: tales 1 TEMP.: -18 C T.P. MOBILE: (411) 728-2631

FORMATION: Quebec City M.B. ELF;.: 143.55 ■ ROADS: Icy MOBILE CHARNEL: NA BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No. Size (1E)

Mfg. Type

Serial f Nozzles

From

To Hrs on Bit MOB (dal)

RPM Condition

Pulled For? Meters Or Co Hrs

leasing - 222

teed IP-12-J11

111 12A 15.9, 2-11.1

340

599

11.75 4-5000

100

4-3-0 1/1 leasing TD

259

13.1 lens 18.75

3 222

teed F43/- 100132 3-9.5p*

599 640

9.00 4-5000 150/210 Trilling

41 4.6

69.00

Time pth nsity

ud Gradient ;is

YP

Is p8

' ter Loss filter Cake Sand

lids

Oil Pf Mf

a:T CI

Salinity

Mud Co. Mud Engineer Mudded Up €

15:00 Rim 6U ■ • 1045

10.25

43

16

4.5

1.0/1.5 1.5

1.5 1.5 vs trace I:nzzle

0.021

nil 0.1/0.45

43

300 0

NI Drlg Fluids Dave

301 1103

Pump No. I Pulp No. 2

e Iktioeai Bosco

'••1 1P-80 D-700

finer X Stroke 140 z 203 140 s 406

•PR 120

l•I a late 1.1 Clain 1• I , Efficiency 100 1

;' (,. Pressure 6000 kPa 4 illpipe AV 39 Main

P' illcollar AV 70 m,sin Veloc. 16 a-sec

ud Cycle 64 min

e.ttoms Cp 11 sin

1 . Tanks 50 n' i:ole Volume 20 n3

,step Vol. 70 n3 MUD ADDITIVES SURVEYS

C41

Caustic Soda

Lignite Peitex Line

CaC12 SAPP Alcomer

Soda Ash Sawdust SHA II Poly Plus Mud Check? Mud Daily Cost Mud Cun Cost

1 sk

4 pails

Ies

$1,369 $11,038

1.2S87W ! 584 2.2120W ! 593 2.91111 ! 602

2.51120E ! 612 2.4240E ! 621

1KER MIKE Payee 6 Barris (dual shakers)

4r' in MESS 2 ! 60 I 80

SOLIDS CONTROL DESILTER CENTRIFUGE

.F. (kg/a3) Fisher De-0atering System

ol (l,iin) Operating 1 i .F. (kg13) 150 bbls clear water

ours I

VOLUMES

Cum W'tr Hauled losses to Porn.

3770 bbls Sil

BOTPOMHOLE ASSEMBLY (No., Item, OD, ID, TJ Type)

Bit, Sedum Speed

pad, z-over sob, IC, 3-DC's, Jars, BHA Length Avail 1208 Jts DP in Hole

171mm Sperry 1-2oeel DC, Rang

12-DC's, rover 175.15

Drill Lad (Rotor -Off Sob (c/w

sub, 1841E Tapered Book Load Jts DP on Racks Jts DP on Location

c/w 1 deg II 12161E Nù probe and pmiser),

Blade leaner,

35,000

sraev-os 1-looel

DP

dal

(114az, 4 1 2111) 100

17,000 53 47

DRILLING OPERATIONS TINE BREAKDOWN WELL CONTROL

Drill

Tripping Rig Service Survey

Ripple HOP Pressure Test Condition Bole Casing

CC.as

anent

inq Bowl Rig Up Tear Out

SIip.Cut MOC IDrillout Cut

9

2 3/4

1/2

3

Coring

Logging

DST Circ Samples

Real Rathole

Handle Tools Rig Repair Reaming

1 1/2

7 1/4

Lost Circ

work Pipe Fishing

Wait on Orders

Total firs 24

RSPP kPa SPM /lax Csg Press Calc Hole Fill Act Hole Fill

last BOP Drill: Daylight Crew ,.Afternoon Crew Graveyard Crew

1100 W 60 3125 kPa 4.80 23 4.55 U

92-01-19 92-01-17

SHOCK SUB (S11, Make, Days in Hole) lesson Jars, 5 days

Spud € Dry Out Shoe € Back DrIQ € 1st Log €

13:00 hrs 92-01-01

13:15 hrs 92-01-22

Surf TD €

Core Pt € FTD € Bit Stop Drlq Rig Release €

24 HOUR SUMMARY 11:00 hrs 92-01-22. leas in locked-up BRA (to straighten out doglegs) from 497 to 599118 1D v/ 100 RP! and 4000

.. to 07:15 hrs. Set 18000 dal am BSA to set jars. Waited 5m off bottom for jars to fire, they did not fire, surveyed to

:30 hrs. fig sery and function hydril to 07:15 hrs. POOR, jars fired when 3 stands were out of the bole. Function( blind

laid dove stabilization, pick up and motor RNA and III to 12:15 hrs. Re-survey at 581, 591 asd 599mICB ID to

.., in removal of doglegs (see revised survey data sheet) to 13:00 hrs. 11g sere and faactics pipe rams to 13:15 hrs.

urectiooally drill 222111 main hole with mud motor and NW) surveys (attempt to drop hole angle and minimize doglegs)

from 599 to 640mVB ID, orient, set and rotate as req'd, to 24:00 hrs 92-01-22.

te: No. 1 floor motor broke down (suspect sain bearing). Will repair or replace rotor, meamwbile still have 2 floor

:tors (compounded) to operate with.

Strap € 1Board Tally 111easureaent Made Corr.'

SOOSDR1fi.TL5 1,'23 92

vA_LLY DR T I~I..zNG I2ElL7C7RT WELL: 9000EP ST-FLAVIIZ 10. 1 REPORI I: 17 DATE: 92-01-24 l DEPTH: 742 mKB ND PROGRESS: 102 m in 21 rotating hours [last 24 hours) J OPER C 0800hrs: Directional Drlq 222 Hole E 778i1B ID FOREMAN: Wilf Kuala: MOBILE NO.: (413) 728-364i

DAILY COST: $27,947 HOLE COND.: Good WEAIHER: lain T00LPGSHER: Gerry Ouimet

CUM COST: $616,240 CONTRACTOR: laIex 1 TEMP.: 42 C T.P. MOBILE: (414) 721-2631

FORMATION: Quebec City K.B. ELEV.: 143.55 m ROADS: Icy MOBILE CHANNEL: III

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No.

Size (awl Mfg.

Type

Serial R Nozzles From To

Ars on Bit

DOB (dal() RPM

Condition

Pulled For? Deters

:Or Cull Mrs

3 222

teed

NP-43&-JK 100832

3-9.5

599 742 30.00 4-50)0 150/210

Drilling

143 4.8

90.00

Tile

Depth

Density 'Mud Gradient

Vis .PV YP Gels

pH water Loss Filter Cake Sand

Solids 011

Pf,'Mf MBT

Cl Ca Salinity

Mud Co. Mud Engineer Mudded Up f

24:00 tirs

742 dB

1050 10.3 47

10.5 8.9

1.5 in

11 Orb; Fluids

11g Check 301 m4B

Pump No. 1 Pump No. 2 'flake latioual Masco Model 8P-10 D-700 -Liner 1 Stroke 140 x 203 140 s 406 5141 120

Pump Rate 1.1 13/min 'Pup Efficiency 100 t Pump Pressure 6000 kPa Drillpipe AV 39 u,min

,Drillcollar AV 70 m,'min

Nozzle ueloc,' 86 n'sec Dud Cycle 61 min

Bottoms Up 21 min

Mud Tanks 52 n3 Hole Volume 23 13

System Vol. 75 m3 MUD ADDITIVES SURVEYS

Gel Caustic Soda Lignite

Peltex Lime

CaC12 SAPP Alconer

Soda Ash Sawdust

SHA II Poly Plus Mud Check?

Mud Daily Cost Mud Cun Cost

20 sr

7 pails le

$1,839 $12,117

2.51628 4 631

2.41731 4 641

2.418E1 4 651 2.45761 4 660 2.35611 4 670

2.3546E4679 2.45241 a 688 2.9591 4 698

3.3511 4 707

3.6581 4 717

3.6S231 4 727

,SHAKER MAKE Payne i Harris (dual shakers) SHAKER MESH 2 460 x 80 SOLIDS CONTROL

DESILTER C.F. (kgjm3) Fisher De-0atering

Vol (1/min) Operating O.F. (kg,13) hours

CENTRIFUGE System

`. VOLUMES Cum Wtr Hauled Losses to Fora.

3920 bbls Hit

BOTPDXHOLE ASSEMBLY (No., 'ten, OD, ID, TJ Type

bit, tedium Speed pad, x-over sab,

DC, 3-DC's, Jars,

BHA Length Avail i0B Jts DP in Hole

171a Sperry

1-lone) DC, Bang

12-DC's, xrover 175.15

Drill Ind Motor

-Off Sub (c/w

sub, 184a Tapered Hook Load

Jts DP on Racks Jts DP on Location

c/w 1 deg E41 i

11D probe and puller),

Blade leaser, 35,000

216om scree-om

1-lomel

DP dal

11148n, 4 1 2X0) 100

17,000 41 59

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill

Tripping Rig Service Survey Nipple BOP Pressure Test Condition Hole Casing

Cenent

Casing Bowl Rig Up Tear Out

slip

WOG Drillout at

21

1/2

2 1/2

Coring

Logging DST Circ Samples

Reai Rathole Handle Tools Rig Repair Reaming

Lost Circ

Work Pipe Fishing Wait on Orders

Iotal Hrs 24

RSPP kPa/SP1

Max Csq Press

Chic Hole Fill Act Hole Fill Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

1200 4 64 3810 kf%

92-01-23 92-01-23

SHOCK SUB i5 N. Make, Days in Holei Mason Jars, 6 days

Spud C

Drl Out Shoe K Back Drlg € 1st Log E

13:00 hrs 92-01-08 Surf ID E Core Pt E

FTD

Bit Stop Drlg O Rig Release

24 HOUR SUMMARY — p0:00 hrs 92-01-23. Directionally drill Z22141 main bole with mud motor and MWD surveys (attempt to drop hole angle and minimize doglegs) from 640 to 675aKB ID, orient, set and rotate as reg'd, to 01:30 hrs. lit) sere and function bydril to 08:45 hrs. Directionally drill with mud motor and IND from 675 to 723mKB MD to 20:15 hrs. tig sen and function pipe rams to 20:30 hrs. Directionally drill with mud motor and iD from 723 to 7421KB ID to 24:00 tirs 92-01-23.

lote: Meld BOP drills with both crews today. Torrential rainfall has filled all ditches, buried tank and shale tank. Will attempt to get permission to pump off rain water today.

Strap E (Board Tall, iNeasurement Made Corr.? 8DR17.XlS l' ENERWK LMGINEFRIMC LTD.

:3C7Q1LJ C ID' I)AI r.Y 1012 T L.I..I'. NC3 V.I:•POI-2`7'

WELL: SOQUIP ST-FIAV111 ID. 1 REPORT t: 18 DATE: 92-01-25 DEPTH: 826 mal ID PROGRESS: 84 1 in 20 1 1 rotating hours (last 24 hours;

OPER € OBOOhrs: Directional Drlq 222a tole @ 870m10î N) FOREK:WI: Wily KravcbIk MOBILE NO.: (418) 728-3648 01111 COST: $26,051 BOLE COND.: Good wE:.THER: Blowing Snow TOOLPUSBER: Gerry Ouiret CUR COST: $642,298 CONTRACTOR: tales 1 TEMP.: -19 t T.P. MOBILE: (118) 721-2631 FORMATION: Quebec City K.B. ELEV.: 143.55 ■ ROME: Very Poor MOBILE CR12111L: 8/k

- BIT PERFORMANCE DRILLING FLUID @PUMPS Bit No. Size (ffi( Mfg. Type Serial 1 Nozzles From

To

Ors on Bit WON (dal) RPN Condition Pulled For' Meters m hr Cue firs

3 222 teed

11P-43A-J1 800832 3-9.5 599 826

50.75 5-6000 150/210 Drilling

227 4.5

110.75

Time Depth Density Mud Gradient Vis PV YP Gels pH

'Water Loss Filter Cake Sand Solids Oil Pf;'If MBT Cl Ca Salinity Mud Co. Mud Engineer Mudded Up €

24:00 bra 126 m8B

1050 10.3

47

9.5 1.7

1.5 •

MI Drlg fluids llig Check

301 11B

Pup No. 1 Pump No. 2 Make Iational Kisco Model 8P-80 D-700 Liner Y Stroke 140 s 203 140 z 406 SPI 120

Pump Rate 1.1 *3/min Pulp Efficiency 100 t Pump Pressure 6000 kPa Drillpipe AV 39 8/tin )rillcollar AV 70 m/rim Nozzle Veloc. 86 m;sec Mud Cycle 71 tin Bottoms Cp 24 min Mud Tanks 52 n3 Odle Volume 26 n3 Systen Vol. 78 n3 MUD ADDITIVES ' SURVEYS

Gel Caustic Soda Lignite

Peltex Lime

1CaC12 SIIP Alcoves Soda Ash Sawdust SEA II

Plus Mud Check? Mud Daily Cost Mud Cum Cost

1 sk

6 pails b

$11,254 $1,371 Avail

2.85328 @ 736 1.95590 @ 745 1.9S901 0 755 2.51621 @ 764 2.111571 @ 774 2.91508 @ 783 2.91408 @ 793 2.71448 @ 803 2.114000812

SEIKER MIKE Payne i Barris (dual shakers) SEAM MESS 2 @ 60 x 80 SOLIDS CONTROL

DESILIER

G.F. (kg, x3) Fisher De-Watering Vol (1 tins Operating )0•F. (kg. 13; Hours

CENTRIFUGE Systee

VOLUMES Cum Wtr Hauled Losses to Form.

4115 bbls Ill

BOTTOMHOLE ASSEMBLY (No,, [ten, OD, ID, TJ Type) it, Median Speed

pad, x-over sub, DC, 3-DC's, Jars, B&, Length

AOB kits DP in Role

171mm Sperry 1-Morel DC, Iamq-Off 12-EC's, n-over

175.15

I-Nonel

Drill Mad lotcr Sob (c/v

sub, 114mm tapered Hook Load Jts DP on Racks Jts DP on Location

c/w 1 deg El i IND probe and per),

Blade tearer, 37,000

216mm screv-on

DP daN (11400, 4 1,211) 100

17,000 32 68

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Service Survey Nipple BOP

Pressure Iest Condition Hole Casing Cenent Casing Bowl Rig Cp Tzar Out flip, Cut

illout Cat

20 3/4

3/1 2 1/2

Coring Logging DST Circ Saiples Ream Rat ole Handle Tools Rig Repair Reaping

Lost Circ Work Pipe Fishing wait on Orders

Total Ers 24

'RSPP kPa;SPM Max Csq Press Calc Hole Fill Act Bole Fill Last BOP Drill: Daylight Cres Afternoon Cres Graveyard Cres

1100 0 62 3810 kPa

92-01-23 92-01-23

SHOCK SUB IS N, lake, Days in Hole) Salon Jars, 7 days pod €

m 1 Out Shoe € Back Drlg € lot Log €

13:00 brs 92-01-08 Surf TD € Core Ft €

ITD C

Bit Stop Drlg U Rig Release €

24 HOUR SUMMARY 90:00 brs 92-01-24. Directionally drill 222ma maim bole with Dud rotor and MAD surreys (attempt to bold or drop hole angle and niniaize doglegs) from 742 to 751NCB ID, orient, set and rotate as req'd, to 01:30 hrs. Rig sert and function bydril to 01:45 hrs. Directionally drill with mud motor and MWD from 751 to 8091KB I) to 16:30 hrs. Rig sere and function pipe rams to 17:00 hrs. Directionally drill with mod motor and IND fro* 809 to 826m10.î ID, appeared to be a formation change at 8231, to 24:00 brs 92-01-24.

Mote: Lost the turbocharger on the No. 3 floor rotor. Replaced turbo vithoat shutting rig down. b. 1 floor actor is still(, out pending replacement.

Strap É 'Board Tally SO0iO1,18.5LS 1,25 92

1M•:asuretent Made Corr.? ENTRCOM ENCINEERINC LTD.

:E3Cv+.aCJ T Y I)A I I.Y 1:3iF2 J: i.i.3: N G 1R E:PCI1I2T

WÎFI L: SOQOIP ST-FLuVIEI ID. 1 REPORT k 19 DATE: 92-01-26 EPTH:

P

911 ID PROGRESS: 15 in 21 rotating hours last 24 hours! PER @ 0800hrs: Directional Drlq 222as Bole @ 914!03 ID FORMAN: Wilf Erauchuk MOBILE NO.: (418) 728-3648 A1L1 COST: $26,604 HOLE COND.: Good WEATHER: Overcast TOOLPCSHER: Gerry Omiset 1[ COST: $666,902 CONTRACTOR: tale' 1 TEMP.: -19 C T.P. MOBILE: ( 411( 728-2631

FORMATION: Quebec City K.B. 11EV.: 143.55 a ROADS: Fair MOBILE CHANNEL: 1/1

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit Na.

Site (an) Mfg. Type Serial 1 Mottles From To Its on Bit

JWOB idol) RPM Condition Pulled For? Meters In hr kim Brs

3 222

teed VP-43A-Jf;

100832 3-9.5 599 911

71.75 5000

150/210 Drilling

312 4.3

131.75

Mire pth city

ud Gradient .is

1s

ter Loss Filter Cake

Sand lids

i1

TX flBT 1

linity Mud Co. llud Engineer Mudded Op 4

14:45 Mrs 885 OKB

1050 10.3

46 16 5

1.0/2.0 9.0 1.2

1.5 an trace 0.031

0.2/0.7 43

300 0

NE Dr1g Plaids Dave

301 2103

Pup No. 1 Pump No. 2 e latiomal Blsoo

odel 1P•10 D•700 finer 1 Stroke 140 a 203 140 r 406 PM 120

Pump Rate 1.1 '3/sin Efficiency 100 1

Pulp Pressure 6500 kPa 0 lllpipe AV 39 main 1 illcollar A7 70 t/min

1 .trle Veioc. $6 a sec 1 ud Cycle 115 min Bottoas Up 26 min

d Tanks 98

n3

II;ole l'alune 25 n3

Systen Vol. 126 m3 MUD ADDITIVES SURVEYS

c

1 austic Soda Lignite Peltex Line CaC12

PP '?lcoaer Soda Ash

.dust HA II ly Plus ud Check? ud Daily Cost

Mud Cue Cost

2 si 1 sk

4 pails Yes

$1,402 $15,656

2.11231 @ 821 2.01171 @ 331 2.714E @ 140

3.61146 @ 150 5.01191 @ 859 5.9125E @ 868 6.3123E @ 171 5.7111E @ 087 5.3114E @ 197

[SHAKER 1tt.KY Payne 6 Barris (deal shakers) SHAKER MESH 2 @ 60 180 SOLIDS CONTROL

DESILTER D.F. (kg:I31 Fisher De-Watering Vol (1/5101 Operating

'O.E. {kg;ml) Hours

CENTRIFUGE System

VOLUMES Cum f4tr Hauled Losses to Fors.

4370 bbls Iii

BUTTONHOLE ASSEMBLY (No., [ten, 00, iD, TJ Type) Bit, Median Speed

, I-over sub, , 3-DC's, Jars,

Length -.;ail iB is DP in Hole

171as Sperry 1-keel DC, lang-Off

12-DC's, a-over 175.15

Drill lad Rotor Sub (c/v

alb, 184ms Tapered Hook Load Jts DP on Racks Jts DP on Location

c/v 1 deg II 6 >li probe ad peIser),

Blade leaner, 37,000

216am screw-oa 1-loeel

DP dal (ll4nn, 4 1,2111 100

17,000 23 77

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping 'Rig Service ,Survey Nipple BOP Pressure Test Condition Hole Casing Cement [Casing Bowl Fie Up, Tear Out Flip Cut !WS )Drillout Cat

21

1/2 2 1/2

Coring Logging DST Cire Samples

Handle Tools Rig Repair Reeking

Ream Rathole •

Lost Circ Work Pipe Fishing Wait on Orders

Total Ers 24

RSPP kPa/SPN lax Csg Press Cale Bole Fill Act Hole Fill last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

1200 @ 65 3810 tPa

92-01-23 92-01-23

HOCK SUB S H, Make, Days in Holei Mason Jars, 1 days ud € 1 Out Shoe €

Back brig 4 Ilst Log f

13:00 hrs 92-01-08 Surf ID € Core Pt f FTD 4 Bit Stop Dag I Rig Release f

24 HOUR SUMMARY X0:00 ors 92-01-25. Directionally drill 2221ms main hole with mud motor and NIB surveys (attempt to bold or drop bole

e and einisire doglegs) from 826 to 1273102 ID, orient, set and rotate as req'd. Formation change and gas babbles in annalus at 1271KB ID, take flow check. Well finally stopped flowing. Continued directionally drilling, increased NOB [to 6000 dal. Bole inclination increased, dropped WOB bad: to 5000 dal, to 09:45 hrs. Rig sere and function bydril to 10:00 hrs. Directionally drill with mud motor and Mi) from 175 to 893.103 ND to 17:15 tirs. fig sere and function pipe ,(•ass to 17:30 ors. Directionally drill with mmd rotor and MWD from 193 to 9110KB ID to 24:00 tirs 92-01-24.

Mote: Background gas units are between I30 and 300. Well flows (a trickle and sosetimes bubbles) on sole ,connections( but pot all) but not while circulating.

StrapI [ard Tall, Measurement ssQ86f14.11.S 1 26 92

Rade Corr.? EHERCON ENGINEERING LTD.

~I~QLJTP 13.ATLY DRTL.I.TNG I:ZEED.oRT REPORT

20 DATE: 92-01-77

in 9 rotating hours !last 24 hours)

FOREMAN: Hill bocci * MOBILE NO.: (416) 721-3643 WEATHER: Clear T00LPUSHER: Gerry Omimet TEMP.: -15 C T.P. MOBILE: (Ill) 721-2631 ROADS: Pair MOBILE CHANNEL: I/A

DRILLING FLUID

WELL: SOQUIP ST-PIAVI1 10. 1

DEPTH: 939 aRB 4D PROGRESS: 26 m

OPER @ 0800hrs: Reaming is w/ Lodked-Op irfA @ 79MB

DAILY COST: $20,636 HOLE COND.: Coed

CUR COST: $619,534 CONTRACTOR: taler 1

FORMATION: Quebec City K.B. ELEV.: 143.55 s

TUT PERFORMANCE

Bit No. Sire (owl

Mfg.

Type Serial

Bottles

From

To

Hrs on Bit

W3B (daN) RPM

Condition

Pulled For?

Meters

n'hr Cun firs

3 leasing Time

222 222 Depth

lead Reed Density

1P-43A-J14 l'-13G-. 'Mud Gradient

100$32 RI 133 'pis

3-9.5 7.9, 2-11.1 PV

599 572 .Y?

939 612 Gels

10.75 1.50 pH

5000 4-5000 Pater Loss

150/210 100-120 Filter Cake

3-3-0 1/3 teaming Sand

Pen. Rate Solids

340 110 Oil

4.2 12.9 Pf,Mf 140.75 leas 6.5 NBT

24:00 hrs

660 ID

1050 10.3 46

Pu.ap Rate 1.1 w34in

Pump Efficiency 100 t

10.0 Pump Pressure 3500 kPa

6.9 Drillpipe AV 39 m1min

1.5 is Drillcollar AV 70 m/min Houle 7eloc. 76 s/sec

Pump No. 1 Pulp No. 2 'Make lational Imsco 'model 1P-40 0-700

Liner 1 Stroke 140 1203 140 z 406

SPI 120

PUMPS

MUD ADDITIVES SURVEYS Cl SLIM 1L'-%E Payne i Harris (dual shakers) SHAKER MESH 2 @ 60 I 10

4.4141 @ 906 Ca 1 sk 4.715E @ 916 Salinity

4.316E @ 923 Mud Co. Mud Engineer Mudded Ep @

SOLIDS CONTROL DESILTER CiHTRIFIGE

A.F.; ikq,131 Fisher De-iiaterinq System

Vol (14in) Operating

A.F. (kg; m3) lours

VOLUMES

Gel

Caustic Soda

Lignite

Peltex

Lime

CaC12

pAPP

.looser

Soda Ash

Sawdust

SLt II

Poly Plus

Mud Check?

Mud Daily Cost

Mud Cun Cost

~ BO'iIbMHOLE ASSEMBLY (Mo., Item, OD, ID, TJ ripe)

Bit, WB Stab, 2-string IBS, short DC, 2-string IBS, 3-DC's, Jars,

12-DC's, s-over sub, tapered blade reamer, DP

4 pails No

$926 $16,512

Cum Ktr Hauled Losses to Form.

BB.4 Length 156.66 ■ Hook Load 35,000 dal

=•rail 00B 17,000 Jts OP on Racks 20 (114mo, 4 1+215) iL Jts DP in Hole 6O Jts DP on Location 100

MI Drag Fluids

ligue 301 m1B

4520 bbls lil

Mud Cycle 116 lin

Bottoms Up 27 min

Mud Tanks 9$ a3 Hole "volume 29 a3

System ';o1. 127 u3

DRILLING OPERATIONS TINE BREAKDOWN 9

4 1/2

Lost Circ

work Pipe

Fishing

Wait on Orders 1

WELL CONTROL

600 @ 60 RSPP kPa SPN 3610 kPa II

Calo Hole Fill 5.75 13

24 Total Hrs

92-01-26

92-01-23

1

1 112

Max a9

Act Hole Fill 5.70 13

Press

Last BOP Drill:

Daylight Crew

Afternoon Crew

Graveyard Crew

Coring

Logging

EAST Circ Samples

Real Rathole

Handle Tools

Rig Repair

leasing

1S1h3C1K SUB IS H, Make, Days in Bolsi Mason Jars, 9 days

v pud@ 1 Out Shoe f

Back Brig E

1st Log f

13:00 hrs

10:00 hrs 92-01-26

Surf ID @

Core Pt K

FTD t

Bit Stop Brig t

Rig Release @

92-01-06

Drill

Tripping

Rig Service

Survey

Nipple BOP

Pressure Test

Condition Hole

Casing

Canent

Casing Bowl

Fig Up Tear Out

lip Cut

Drillout Cat

'24 HOUR SUMMARY 00:00 hrs 92-01-26. Directionally drill 222mm main bole with mud motor and I D surveys (attempt to bold or drop hole

ndlbad trouble trying to orient hole right and drop bole angle, to 10:00 hrs. Gut tanks to get Ind weight op for trip out

e and minimize doglegs) from 911 to 93910 ID, orient, set and rotate as req'd. Penetration rate dropped to 2.9 m/br

(due to intermittent gas flow from wel1). Conducted flow check and POOH, strap out, flow checks while tripping, to 13:00 Laid down mud motor, lonel DC's and IND tools. Picked up locked-up Ell and stabilization to 14:00 hrs. III to

15:30 hrs. Reid BOP drill with crew. leas with locked-up BHA from 572 to 612mKB ID (started at sever,: dogleg from ILPrevious motor run) with 4-5000 dal CB, torque from 110 to 250 ft-the, to 24:00 hrs 92-01-26.

Strap p 939.0 mB !Board Tall{ 919.00 m IMeasureoent 936.62 m jMade Corr.? 0.33 m diff, lo S008bR20.AIS 1 27,92 EKERCOK ENCIMIERINC LTD.

soQ tJ I I~ I... Y 17 F2 :I Z. L I N G I2 TE:; IP WELL: SWAP ST-PLAV161 N0. / REPORT 4: 21 DAIE: 92-01-21

DEPTH: 939 m43 ND PROGRESS: Iii rotating hours (last 24 hoUrs)

oPER @ 0800hrs: Directionally Drill v/ I.al Jotor F 946mKB FOREMAN: Wilf Krawmuk MOBILE NO.: (418) 721-3643

DAILY COST: $21,144 HOLE COND.: Good WEATHER: Clear TOOLPUSHER: Gerry Ouimet

CCII COST: $710,612 CONTRACTOR: lames 1 TEMP.: -15 C T.P. MOBILE: (411) 721-2631

FORMATION: Quebec City K.B. ELE'..: 143.55 ■ ROADS: Pair MOBILE CHARNEL: I/1

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No. Size (®) Mfg. Type Serial t Nozzles

From

o Mrs on Bit

IOB (dal) RPM Condition Pulled For?

Meters n,hr Cum 'firs

leaning

heed IP-13G-JK II jab

7.9, 2-11.1 572

939

29.50 2-4000 100-120 4-4-1

End leaning 367

12.4 Real 29.5

222 Depth .Time

nsity Ilud Gradient

Vis ,PV

471,

Gels

'p8

Water Loss Filter Cake Sand

plids e)il

Pf.Mf MET

Cl )Ca Salinity

Mud Co. Mud Engineer Mudded Up @

20:00 hrs 939 a 1050 10.3 41

9.5 1.1

1.5 ma

MI prig Plaids

Rig check 301 mKB

Purp Mo. 1 Pump Mo. 2 Make National Kisco Model 8P-10 D-700

Liner 1 Stroke 140 z 203 140 z 406

SPM 120

Puap late 1.1 113;min

Pump Efficiency 100 t

Puap Pressure 3500 kPa

Drillpipe IV 39 i/'sin

Drilicollar AV 70 1:min Nozzle 7eloc. . 76 Vsec

Mud Cycle 94 Vin

Bottoms Cp 27 tin Mud Tanks 74 m3 Hole Volune 29 n3

System Vol. 103 13 MUD ADDITIVES SURVEYS

C-el Caustic Soda

Lignite Peltex Lime

CaC12

SAPP Alconer

Acid Sawdust SEA II

Poly Plus Mud Check? Mud Daily Cost Mud Cull Cost

3 si

1 pail

4 pails 6 pails

lo $2,790 $19,372

SHAKER M?.KE Payne 4 Harris (dual shakers) SHAKER MESE 2 160 1 80 SOLIDS CONTROL

DISILTER C.F. (kgl43l Fisher De-Watering

Vol (1;nin) Operating O.F. (kg'n3) Hours

CENTRIFUGE System

VOLUMES

Cum W'tr Hauled Losses to Fora.

4670 bbls

Nil

BOTTOMHOLE ASSKMBLY (No., Item, OD, ID, TJ Type( Bit, NB Stab, 2

.12-DC's, i-over '

BHA Length ?,rail WOB Jts DP in Hole

-string IRS, short sub, tapered blade

156.66 m

DC, 2-string reamer, DP

Hook Load

Jts DP on Racks Jts DP on Location

I9s, 3-DC's, Jars,

38,000 dal

(114an, 4 1:2.121 100

17,000 13 82

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping Rig Service

Survey Nipple BOP Pressure Test Condition Hole Casing

Cenent

Casing Bowl

Rig Up 'Tear Out Slip, Cut WOC Drillout Cat

1 3/4

1/2 1/4

1/4

Coring Logging

AST

Circ Samples Ream Rathole Randle Tools

Rig Repair Reaming 21

Lost Circ

Burk Pipe

Fishing wait on Orders

Flow Check

Total Hrs

1/4

24

RSPP kPa,'SPN Max Csg Press

Calc Hole Fill

Act Hole Fill

Last BOP Drill: Daylight Crew

_Afternoon Crew Graveyard Crew

650 a 64

3110 tEl

92-01-26

92-01-23

SHOCK SUB iS N, Make, Days in Hole( Jason Jars, 10 days

Spud E Dr1 Out Shoe C Back Drlg g

1st Loa €

13:00 hrs 92-01-01 j

i

Surf TD E Core Pt €

FTD p Bit Stop Drig K Rig Release €

,

24 HOUR SUMMARY

.1:00 hrs 92-01-27. lean bole open (to remove severe doglegs from the directional drilling) with locked-up INIk frog 682

to 8370KB, torque on string from 150 to 350 ft-ihs, to 11:45 hrs. Rig sery and function hydril to 12:00 hrs. Rea. from 837

to 8561KB to 13:15 hrs. Rig sere and function pipe rams to 13:30 hrs. leas from 856 to 9791101 with torque from 150 to

435 ft-lbs, to 21:30 hrs. Gun tanks to get a little more mud weight (well still flows intermittently) to 21:45 hrs. Survey

conducted flow check to 22:15 hrs. P031, take flow checks while tripping to 24:00 has 92-01-27.

Strap C 939.0 WB Board Tali; 939.00 r Measurement 939.49 n Made Corr.? 0.49. diff, no SOQ8DR21.1LS 1/2812

N ENGINEERING LTD.

..-7..O4:21.—JTV' IDA I:_.. V []R _L L.L NG 12 E POF'tT

MIELL : SOQU1P ST-FLAVIFJ MO. 1 REPORT I: 22 DATE: 92-01-29 DEPTH: 1019 WCB ID PROGRESS: 40 a in 14 1;4 rotating hours !last 24 hours) OPER @ O800hrs: Tripping for Washout (Depth 10351(IB ND) FOREMAN: tilt Rrawdnt MOBILE MO.: (414) 721-3644 DAILY COST: $22,219 BOLE COND.: Good WEATHER: Clear TOOLPUSH£R: Gerry Quint CUM OOST: $712,921 CONTRACTOR: ' latex 1 TEMP.: -4 C T.P. MOBILE: {411) 724-2631 FORMATION: Quebec City K.B. ELE'+.: 143.55 ■ ROADS: Icy MOBILE CHANMEL: 1/A

BIT PERFORMANCE DRILLING FLUID PUMPS Bit %o, Size (fn) Mfg. Type Serial i Nozzles From To Bra on Bit L]OB (dalil RPM Condition Pulled For? Meters f hr Cun firs

4 222

teed 11P-51A-JK 1-13210 3-9.5 939 1019 14.75 5000

140/180 Drilling

10 5.6

155.00

T ime Depth Density Mud Gradient his

PV YP Gels pfi mater Loss Filter Cake Sand Solids Oil Pf/Mf MBT Cl

Ca Salinity Mud Co. Mud Engineer Mudded Cp @

23:00 hrs 1019 ■

1060 10.19

41

9.5 4.7

1.5 in

II I..rlq Fluids Rig check

301 nKB

Pump No. 1 Pulp Mo. 2 Make Iatiooal Tim Model 4P-$0 D-700 Liner Y Stroke 140 x 203 140 x 406 SF1 120

Pup Rate 1.1 all'in Pump Efficiency 100 t Pup Pressure 6600 kPa Drillpipe AV 39 •,•'min Drillcollar AV 70 1/1in Nozzle Veloc. 16 m;sec Mud Cycle 107 min Bottoms ep 29 fin Mud Tanks 16 m3 Hole 'volume 32 13

System Vol. 114 m3 MUD ADDITIVES 'SURVEYS Gel Caustic Soda Lignite Pelter Line CeC12 SAPP .lcomer Acid Sawdust SHA. II Poly Plus Mud Check? Mud Daily Cost Mud Cun Cost

15 sx 1 sk

4 pails No

$1,120 $20,492

3.9113E @ 934 3.7119E @ 943 3.11201 @ 953 2.5114E @ 962 1.1130E @ 971 1.51656 @ 911 1.51606 @ 991 1.31673 @ 1000 0.41346 @ 1010

SHAKER (USE Payne i Harris (dual shakers) SB.`(ER MESH 2 @ 60 x 4O SOLIDS CONTROL

DESILIER U.F. ikg.u31 Fisher De-Watering Vol (l.nin) Operating O.F. (W13) fours

T1

CENTRIFUGE Syster

VOLUMES Cum idtr Hauled Lasses to For•.

4430 bb's Nil

BOTPOMHOLE ASSEMBLY ilo., Item, OD, ID, TJ Type) ,Bit, Lo Speed pad, x-over sub, DC, 3-DC's, Jars, 'BHA Length Avail WOB Jts DP in Hole

17114 Sperry Adj 1-Ionel DC, Bang12-DC's, x-over 174.84 •

Mad Motor c/v -Off Sub (c/v sub, 1$4ma Tapered

Hook Load Jts DP on Racks Jts DP on Location

1.5 deg B1 4 2164 IND probe and puller),

Blade leaner, 39,000

screv-ft 1-None!

DP daM ill4mm, 4 1;2YH) 100

17,000 11 19

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Service Survey Nipple BOP Pressure Test Condition Hole

sing eament

ing Hod Rig Lp Tear Out, 'lip Cut 4C prillout Cat

14 1/4 4

1/4 2 1/2

Coring Logging DST Circ Samples Ream Rathole Handle Tools Rig Repair Reaming

2 1/2

Lost Circ work Pipe Fishing wait on Orders MWD Failure

Total Mrs

1/2

24

RSPP kPa/SPM Mai. Csg Press Caic Hole Fill Act Hole Fill last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

1100 @ 61 3780 kPa 5.40 13 5.92 al

92-01-26 92-01-24

SHOCK SUB IS N, Make, Days in Hole] Jason Jars, 11 days [Spud k Ohl Out Shoe C Back Drug @ llst lag p

1.

13:00 hrs 92-01-01

06:00 hrs 92-01-21

Surf TD F Core Pt k LTD € Bit Stop Drlg F Rig Release F

24 HOUR SUMMARY :00 hrs 92-01-21. POOI, strap out, take flow checks. Checked crown stopper, OR, to 01:00 hrs. Laid down locked up

BMA (reaming assembly) and picked up low speed Sperry Drill mud rotor. Checked NiD tool to 03:30 hrs. III to 06:00 hrs. Directionally drill 2221m rain bole with mud rotor (attempt to drop bole inclination and turn hole to the right while lniniai:ing dogleg severity) from 939 to 961.18 ND, take surveys with R(D as reg'd, to 12:00 hrs. Directionally drill ahead, DID survey as req'd, from 961 to 1019m KB ND, rig sery and function pipe rams, to 23:00 hrs. BID tools would of function, appeared to be stalling out, to 23:30 hrs. Flow check and POOH to check for IfD malfunction to 24:00 hrs

Iî92-01-21.

Strap 'Board T,-ally SOO801,22. SIS 1 2'i; 92

'Measurement Made Corr.? DEMON ENCIMEERINC LTD.

SOQC7T1~

1:7ikTY,V DRZL.r,TNG 12E1?O12T WELL: 9040IP ST -FLUID! 10. I REPORT is 23 DATE: 92.01-30

DEPTH: 106411B ID PROGRESS: 45 ■ in 11 rotating hours (last 24 hours)

OPER @ 0800hrs: PODS to check for washouts 4 MD function FOREMA3: Will Kraechuk MOBILE NO.: (418) 728-3648

DAILY COST: $15,502 POLE COND.: Fair WEATHER: Clear TOOLPUSHER: Gerry Ouiaet

CC11 COST: $741,423 CONTRACTOR: latex 1 TEMP.:" +3 C T.P. *MILE: (411) 723-2631

FORMATION: Quebec City K.B. ELEV.: 141.55 ■ ROADS: Sloppy MOBILE CHANNEL: 1/A

BIT PERFORMANCE DRILLING FLUID PUMPS 1I

Bit No.

Site (mml 3fq. kk)pe Serial/ Nozzles

From To Hrs on Bit

iIDB (daMl

RPM Condition Pulled For?

Meters m hr Cum firs

4 222 teed

1P-518-J1

1F-13210 3-9.5 939 1064

25.25 5-7000 140/180

Drilling

125 5.0

166.00

tae Depth

Density

Mud Gradient 1,1s

PV 'YP Gels pH Water Loss

Filter Cake Sand Solids

oil

Pf/11 JIBT C1 Ca

Salinity Mud Co. Mud Engineer Mudded Up @

24:00 (us 1064 t ,Make 1050 10.3

39

9.5 8.8

1.5 mm

1I Drig Fluids Rig tip 301 n103

Pulp lo. 1 Pump No. 2 Rational Bosco

Model W-$0 D-700

Liner 1 Stroke 140 x 203 140 x 406 SPM 120

Pulp Rate 1.1 aljain Pump Efficiency 100 t Pump Pressure 6600 kPa Drillpipe AV 39 n;nin -Drillcollar AV 70 main Nozzle Veloc. 86 a/sec Mud Cycle 114 ain Bottons Up 30 ain Mud Tanks 92 a3 Hole Volume 33 143,

System Vol. 125 ml MUD ADDITIVES SURVEYS Gel

Caustic Soda Lignite Peltea Live

CaC12 SAPP !lcomer

Acid

Sawdust

SRA II Poly Plus Mud Check? Mud Daily Cost Mud Cum Cost

1 sk

1 pail 3 pails b

$307 $21,299

0.5129W @ 1019 0.8170W @ 1028 1.21871 @ 1038 1.5S801 @ 1047

SHAKER MAKE Payne 4 Harris (dual shakers) SHAKER MISR 2 @ 60 r 80 SOLIDS CONTROL

DESILTFR CENTRIFUGE U.F. (kgjm3) Fisher De-Watering System

Vol Wain) Operating

O.F. (kg,131 Hours 11

VOLUMES Cum Wtr Hauled Losses to Fora.

4980 bbls Mil

BCYI rOMBOLE ASSEMBLY No., Item, OD, ID, TJ Type)

Bit, low Speed pad, x-over sub,

DC, 3-DC's, Jars, BH'-. Length Avail WOB Jts DP in Hole

171am Sperry Adj 1-loael DC, lang-Off

12-DC's, s-over 174.84 a

Wad tor c/a

Sub (c/a sub, 184mm Tapered

Hook Load Jts DP on Racks Jts DP on Locat

1.5 deg BR 4 216mm M) probe and pulse),

Blade Reamer, 40,000

screw-os 1-bnel

DP dal

(li4ne, 4 1'2XHi 100

17,000 6 94 on

DRILLING OPERATIONS TIME BREAKDOWN îtiELL CONTROL Drill tripping Rig Service Survey

Nipple BOP

Pressure Test ondition Hole inq

anent

sing Boil Rig Cp Tear Outs

1S1ip Cut

l+OC tDrillout Cat

11 4 1/4

2 3/4

1/4

Coring

logging DST Circ Sanples

Ream Rathole Handle tools Rig Repair Reaming

Lost Circ Work Pipe

Fishing wait on Orders

Flo", Check Re-break 4 Re-

dope drillstr Total Ers

- 1/4

5 1/2 24

RSPP kPa/SPI( Ma. Csg Press Calc Hole Fill `.ct Hole Fill

last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

1100 @ 62 3810 kPa 5.85 23 5.99 23

92-01-26 92-01-23

SHOCK SUB iS N, Make, Days in Hole' Jason Jars, 12 days

Spud g Drl Out Shoe € Back Dr1g €

1st Log €

13:00 hrs 92-01-08 Surf TD @ Core Pt E

FTD t

Bit Stop Drlq Rig Release K

24 HOUR SUMMARY 00:00 hrs 92-01-29. Clean DP screen, survey and 111 2 stands to 00:30 hrs. Directionally drill 222a• lain bole with and {motor (attest to drop hole inclination and turn bole to the right while minimising dogleg severity) from 1019 to 1035mifB li , take surveys with KID as req'd, to 05:15 hrs, MD tool was giving erratic performance, decided to PCR to check Isaae. Gunned mad tanks to get mud density up, pumped down increased density, POOH. Had tight spot at 750 to 737mKB. Kept hole fill pump running caatinuoasly in order to pall wet (checking for washout). Found washout is slip area ,of pipe OR bottom of 5th stand above the DC's to 09:00 hrs. Attempted to break out the damaged joint in the moasehole, twisted the joint off. laid down pieces of broken joint to 09:15 hrs. POOH, checked MFD tool and bit, both appeared OR,

to 10:30 hrs. III, re-break and re-dope drill string, check every joint for visible cracks or washouts, to 15:00 hrs. irectionally drill ahead with motor and M) from 1035 to 10642KB ID, same further indications of erratic MWD

![perEoraance, observe very closely, to 24:00 hrs 92-01-29.

Strap t Board Tally 1Keasurevent Made Corr,?

SOQ8DR23.XIS 1 10 9

:3CD4c,2U1 IL 1'

UP, _L I~ Y U I2 I L I_. 7 N G TZ

WELL: SOQUIP ST-F1AVI17 10. $ REPORT is 24 DATE: 92-01-31

DEPTH: 1100 mIB ID PROGRESS: 36 a in 12 1 2 rotating hours (last 24 hours)

OPER @ 0800hrs: Directionally Drlg r/ lotor 4 1126m K1 ND FOREM.aN: Wilt Krawcuk MOBILE NO.: (41e) 728-3643

DAILY COST: $14,185 HOLE GOND.: Fair WEATHER: Snowing TOOLPt'SHER: Gerry Ouiaet

CUM COST: $762,608 CONTRACTOR: Ralex 1 TEMP.: -8 C T.P. MOBILE: (418) 728-2631

FORMATION: Quebec City K.B. ELEV.: 143.55 a ROADS: Icy MOBILE CHANNEL: 1/6

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No. Size (mI Mfg. Type Serial î

Nozzles From

'[o

Its on Bit ice (dal) RPM

Condition Pulled For? Meters a hr Cue Hrs

4

222 Reed

1PiIA-JK

1-13210 3-9.5 939

1100 37.50

5-7000 80/140 Drilling

161 4.3

178.50

Tine Depth Density bud Gradient

Vis PV

YP .Gels

pB water Loss Filter Cake

,Sand Solids Oil

Pf Mf RBI

Cl Ca Sulphates Mud Co.

Mud Engineer Mudded Up €

15:15 hrs 1077 ■

1060 10.39 40 12

4 1.0/1.5

9.0

10.4

1.5 mm trace

0.038 ail

0.3/0.75 43

350 mil

NI Drlg Fluids Dave

301 M B

Pup Mo. 1 Pop No. 2 'lake National loco Model 8P-80 D•700 liner X Stroke 140 z 203 140 x 406 SIM 120

Pulp Rate 1.1 13;4in

Pulp Efficiency 100 2

Punp Pressure 6000 kPa

Drillpipe AV • 39 ■;tin Drillcollar AV 70 t,'tin Nozzle Veloc. 86 r:'sec Mud Cycle 124 tin Bottots Cp 31 RID lud Tanks 102 m3 j Hole Volute 34 n3

System Vol. 136 m3 MUD ADDITIVES SURVEYS

Gel austic Soda

ignite 'eltex Lime

CaCl2

SAPP Alconer

Acid

.+dust :R II Poly Plus lad Check? 1 ud Daily Cost 1 d Cup Cost

18 si 1 sk

3 pails Yes

$1,333 $22,682

1.6S60W 4 1057 1.5S59N 4 1066 2.06551 4 1075

2.55541 4 1085 3.06531 4 1094

3.05541 4 1103

SHARER MARE Payne & Barris (dual shakers) SHARER MESE 2 460x30 SOLIDS CONTROL

DESILTER C.F. (kg,'t3) Fisher De-Watering

Vol Wain) Operating

10.F. (kg i113)

Hours

CENTRIFUGE System

VOLUMES

Cum irtr Hauled Losses to Fora.

5205 bbls lil

BOTTOMHOLE ASSEMBLY (No., [ten, OD, ID, TJ Type)

Bit, Lev Speed pad, x-over sub, DC, 3-DC's, Jars, BHA. Length Avail 1130

Jts DP in Hole

1711• Sperry Adj Lionel DC, Hang

12-DC's, I-over 174.34 1

rid lotor c/v -Off Sib (c/w

sub, 184m tapered Hook Load Jts DP on Racks Jts DP on Location

1.5 deg 61 6 216m NNî1 probe and pulser),

Blade leaner, 42,000

screw-on 1-Ronel

DP dal(

(1141n, 4 1.21131 100

17,000 3 97

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping Rig Service Survey

Nipple BOP Pressure Test

Condition Hole Casing

Cenent

Casing Boll

Rig Cp Tear Out

Slip Cut

"M

CDrillout Cut

12 1/2

7 1/2 1/2

1 1/2

1

Coring Logging

DST

Circ Sanples Ream Rathole

Handle Tools Rig Repair Reaming

1

Lost Circ Mork Pipe Fishing ;fait on Orders

Total Hrs 24

RSPP kPa!SPM lax Csg Press Calc Hole Fill

Act Hole Fill

Last BOP Drill:

Daylight Crew Afternoon Crew Graveyard Crew

1500 8 66 3780 kPa 7.20 s3

7.50 13

92-01-26 92-01-23

SHOCK SUB iS N, Make, Days in Hole) Itasca Jars, 13 days

spud €

Drl Out Shoe @

Back Drkg €

1st Log €

13:00 hrs 92-01-08 Surf ID E Core Pt €

FTD €

Bit Stop Drlg f Rig Release @

1 24 HOUR SUMMARY 00:00 brs 92-01-30. Directionally drill 222m rain hole with mud motor (attempt to drop hole inclination and turn bole to the left with the natural tendencies while minimizing dogleg severity) from 1064 to 1075mIB RD, take surveys with INID

req'd, to 04:30 hrs. INN) tool was giving erratic performance again, decided to PON to check sane. Kept bole fill pump

ing continuously in order to pull wet (checking for washout), to 08:00 hrs. Did rot find any evidence of washouts in drill;!

triag. Changed out NI) tool (subsequent tests on tools removed did not turn up any problems but will not use the IND tool again) to 09:30 brs. Slip and art drilling line to 10:30 hrs. RIB below surface casing, pick up kelly to

®D operation, tool Olt, checked NID operation every 10 stands to bottom, all PC, to 14:00 hrs. Rig sere and

out weight indicator to 14:30 brs. Directionally drill ahead with low speed mud motor and NID surveys, orient as

req'd, from 1075 to11002B MD to 24:00 hrs 92-01-30.

r:trap ï !Board Iall; *asurnent [Made Corr.?

5048DR24.XLS 1_31.92

EMFRCON ENGINEERING LTD.

, i+

53C7Q1J T 1P i7AT 1.V 17>fl rr.r.rra oR'r WELL: SOQOIP ST-PIAVIKI ND. I REPORT I: 25 DUI: 92-02-01

DEPTH: 1174 NB 8D PROGRESS: 71 n in N 1 7 rotating hours ilast 71 hours)

6TER C O840hrs: POOH to Year Out Doglegs p Core Point FORFM?N: wilt Krawd.Ik MOBILE NO.: (418) 728-3648 D),IIY COST: $28,791 HOLE (OMD.: Good )4FP.THER: Blowing Snow TOOLPISHER: Gerry Ooiret

CUM COST: $791,399 CONTRACTOR: !Alex 1 TEMP.: -10 C T.P. MOBILE: (41$) 72E-2631

PORM?,TION: Quebec City K.B. FLU.: 143.55 ■ ROADS: Icy NORTH CHANNEL: I/1

BIT PERFORMANCE DRILLING P1.11ID PUMPS

Bit No.

Site (en) Mfg.

Tape

Serial 4

Nozzles

From

To Ars on Bit 1DB (daN(

RPM

Condition

Pulled For?

Meters

n,hr Cue Rs

4

222

teed NP-51A-J1

1-13210

3-9.5

939

1174

59.25

5-9000

80/140

Drilling

235

4.0 200.00

Tire

Depth

Density

Mud Cradient ":is

P'+

YP

0e1s

pH

water Loss

Filter Cake

Sand

Solids

Oil

(Pf Xi MBI

C1 Ca

Sulphates

Mud Co.

Mud Engineer added Cp €

20:00 hrs

1163 r 1060

10.39

41

10.0

10.6

1.5

NI Drlg Fluids

gig Check 301 ma

Pump No. l Pulp No. 2

ake National Tosco odel 81180 D-700 Liner X Stroke 140 x 203 140 x 406

SPN 120

Pump Rate 1.1 23.'tin Puip Efficiency 100 1

Pulp Pressure 6500 kPa

Is iîlpipe AV 39 tlrin

I illcollar AV 70 n min

o'zle 7eioc. 86 n sec

ud Cycle 126 Yin

:.ttors Cp 34 sin

i ud Tanks 102 03 ;one 7olune 37 s3

System Vol. 139 03 MUD ADDITIVES SURVEYS

Gel

Caustic Soda

Lignite

Pelter.

line

CaC12

S?.PP .Ilconer

Acid

Sawdust

SEA II

Poly Plus

Mud Check? Mud Daily Cost Mud Cup Cost

2 so

5 pails

10

$1,174 $23,856

2.454511 @ 1112 2.4S30B 6 1122

1.7S144I @ 113'

1.2:15A @ 1141 0.952E f 1150

0.753E @ 1159

SH?KER MAKE Payne 4 Harris (dual shakers) SHAKER MESA 2 @ 60 o 80

SOLIDS CONTROL

DESILIER C.F. (kg 101 Fisher De-Watering

.ol )1,'0inl Operating r.F. kkg,031 IioHrS

CENTRIFUGE

System

VOLUMES Cm iitr Hauled Losses to Faro.

5355 bbls Nil

BOTTOMHOLE ASSEMBLY 1110., Iten, OD, ID, TJ Type)

it, Low Speed , i-ever sub,

, 3-DC's, Jars,

BEA Length

).'.:ail iiOB

Its DP in Hole

171mm Sperry Adj 1-Monet DC, lang-Off 12-DC's, x-over

174.84 m

Mud Motor c/w Sub (c/w

sub, 1841m Tapered

look Load

Jts DP on Racks

Jts DP on Location

1.5 deg BB 8 216m

1 ) probe and Blade leaner,

43,000

screw-on

Riser), 1-lonel

DP dal 1114am, 4 1 21H(

181 17,000 76

105

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill

Tripping

Pig Service

Surrey

Nipple BOP

Pressure Iest

Condition Hole

Casing

kCenent

Casing Bax1

Pig Cp Tear Dutl

',Slip Cut

';;{x

Drillout Cat

21 1/2

1/2

2

Coring

Logging

DST

Circ Sarples

Pea Ratbole

Handle Tools

Rig Repair

leaning

Lost Circ

work Pipe

Fishing

wait on Osiers

Iotal Ers 24

RSPP kPa SPM

lax Csg Press

Calo Hole Fill Act Bole Fill

Last BOP Drill:

(Daylight Crew

Afternoon Crew

Cra.eyard Crew

1750 $ 60

3780 kPa

92-01-31

92-10-31

(SHOCK SUB IS A, Make, Dais in Hole: Mason Jars, 14 days

,Spud

lEack

Ilst

C r 13:00 hrs 92-01-08 Surf TD €

Dr! Out Shoe t ' Core Pt C

Drlg € FTD C

Log € .Bit Stop Dig C

Pig Release €

X24 HOUR SUMMARY

th

00 hrs 92-01-31. Directionally drill 222m main hole with mud motor (attempt to drop hole inclination and turn bole to e left with the natural tendencies while uinimi:ing dogleg severity( from 1100 to 112640 1D, take surveys with MWD

Îa` reg'd, to 08:00 hrs. lig sere and function bydril to 08:15 hrs. Directionally drill ahead with rod motor from 1126 to 1114740 ND, survey every single with MID, to 16:00 hrs. Rig sere and check brake pins to 16:15 hrs. Directionally drill iabead with mud motor fro. 1147 to 1174mKB RD, surrey with NiD, to 24:00 hrs 92-01-31.

lote: Meld BOP drills with both crews. klso, background qas is down and there are no more bobbles in the annulus.

rip ~

:Board Tall, M_ u p_nt w cc Corr.?

~~~NEDF.-! .?:LS 2 1 y2 ~— ~~ _ . ~_ -- FIIERCJN INCINIERING LID.

S 4=#Q U T P 1WS.,TT_.V T2E17.OI2'I'' WELL:

SOQOIP ST-FIAVIFJ 10. 8 REPORT is 26 DATE: 92-02-02 DEPTH: 1189 Y03 ND PROCRESS: 15 ■ in 6 rotating hours Oast 24 hours) OPER f O800hrs: POOH (after teaming Doglegs) to Core FOREMAN: Nlilf Rrarcbuk MOBILE NO.: (418) 728-3613 DAILY COST: $24,662 HOLE COND.: Good WEATHER: Clear TOOLPDSMER: Gerry 0ainet CUM COST: $816,061 OONTkA.CTOR: telex 1 TEMP.: -12 C T.P. MOBILE: (418) 728-2631 FORMATION: Quebec City R.B. ELEV.: 143.55 a ROADS: Icy MOBILE CHANNEL: 1/A

BIT PERFORMANCE DRILLING FLUID PUMPS IBit No. Size Inn) Mfg. Type Serial $ Nozzles From To Ers on Bit WOB (daN) RPM 'Condition Pulled For? Meters n 'hr Cue Hrs

4 222 teed

HP-513,1E I-13210 3-9.5

939 1189 65.25 5-9000 12/140

2-2-0 lmn Core Point

250 3.8

206.00

5 222 leed

MP-313-JE Q-31674 3-11.1

939 1085 10.50 3-4000

100

146 13.9

bg 54.75

Time Depth Density Mud Gradient Vis PV YP Gels pH Water Loss Filter Cake Sand Solids Oil Pf ;'Mf MBT Cl Ca Sulphates Mud Co. Mud Engineer Mudded Cp @

21:45 hrs 1160 a 1070 10.49

41

10.0 9.8

1.5 am

NI Drlg Fluids tic] Check 301 10C.F.

Pump No. 1 Pulp No. 2 Make Mational Ease* Model 8P-80 D-700 liner Y Stroke 140 r 203 140 r 406 SFM 120

Pump Rate 1.1 23;min Pump Efficiency 100 I Pump Pressure 3000 kPa Drillpipe AV 39 m,'min Drillcollar AV 70 m min nozzle Veloc. 63 asec Mud Cycle 127 min Bottoms Cp 34 min Mud Tanks 102 13 Hole Volune 37 13 System Vol. 139 13 MUD ADDITIVES SURVEYS

Gel Caustic Soda Lignite Peltex Lille CaCl2 SAPP Alconer Acid Sawdust SEA II Poly Plus Mud Check? Mud Daily Cost Mud Cum Cost

1 pail

2 pails 3 pails

No $170

$24,726

0.455512 @ 1168 SHAKER MAKE Payne & Barris (dual shakers) SHAKER MESH 2 @ 60 r 80 SOLIDS CONTROL

OISILIER Ikq'a31 Fisher lie ilateriag

,:il Il;nini Operating O.F. Ikg!m3i Hours

CENTRIFUGE System

VOLUMES Cue Wtr Hauled Losses to Fora,

5505 bols Mil

BOTTOIHTOLE ASSEMBLY No,, Item, OD, ID, TJ Type) it, 8E Stab, 2

12-DC's, rover

EEL Length Avail woe Jts DP in Hole

-string IBS, short sub, tapered blade

156.66 ■

DC, 2-string reamer, DP

Hook Load Jts DP on Racks Jts DP on Location

IBS, 3-DC's, Jars,

45,000 dal 1ll4nn, 4 1,'221 III 181

18,000 83 98

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Serice Surrey nipple HIP Pressure Test Condition Hole Casing Cenent Casing Bowl Pig Cp Tear Out Slip Cut i3OC Drillout Lit

6 5 1/4

1/4

Coring Logging DST Circ Sanples Ream Rathole Handle Tools Riq Repair Reaming

3/4

1 1/4

10 1/2

Lost Circ work Pipe Fishing Wait on Orders

_

Total Ers 24

PSPP kPa'SAt Max Csg Press Calc Hole Fill Act Hole Fill Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

1100 @ 80 3750 kPa 7.32 m3 7.50 13 EI

92-01-31 92-10-31 (

ISHOCK SUB IS N, Make, Days in Sole' Mason Jars, 15 days Spud € Dri Out Shoe € Back Eric € 1st Log @

13:00 hrs 92-01-08 Surf TD € Core Pt € FIE € Bit Stop D lq Riq Release €

06.15 hrs 92-02-01

24 HOUR SUMMARY îi:00 hrs 92-02-01. Directionally drill 222mm main bole with mud motor (attempt to drop bole inclination and turn hole to t• left with the natural tendencies while minimizing dogleg severity) from 1174 to 1189118 MD, take surveys with MO

— req'd, to 06:15 hrs. Circ up bottoebole sanple at core point (picked on depth) to 07:00 hrs. Flow check, POOH and .trap out. Stand dove aid motor and none) EC's to 11:00 hrs. RIM with locked-up PIA to ream out doglegs from Directionally drilled bole to 9114B to 13:15 hrs. Pick up kelly and ream out oriented bole section from 918 to 108511E to 24:00 hrs 92-02-01.

Strap € 1189 1B [Board Tally 3189.53 a IMeesurenent 1189.60 m { Made Corr.? 0.07a diff, to 9DQ8DP26.YIS 2 2: ERODE EMCIMEERTMG LTD.

SOQLJ i I~ 171L.ING REPOI2~' WELL: SOQOIP ST-ELAVIIN h0. 1 REPORT t: 27 DATE: 92-02-03

DEPTH: 1192.2 m118 PROGRESS: 3.2 m in 6 rotating hours tlast 24 hours)

OPEI C 080Ohrs: Recover Core No. 2 FOREMAN: Mill Kravchuk MOBILE NO.: (411) 72$-3648

DAILY COST: $11,441 HOLE COND.: Good WEATHER: Clear TOOLl9;sSEB: Gerry Mint CUM COST: $134,509 CONTRACTOR: Baler 1 TEMP.: -12 C T.P. MOBILE: (411) 721-2631 FORMATION: Quebec City R.B. ELEV.: 143.55 a ROADS: Fair MOBILE CHANNEL: I/I

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit Ko. Size Ism) Mfg. Type

Serial i ,Nozzles

From 4o

firs on Bit

603B (dal)

RPM „Condition ,Pulled For? Meters ,n'lu' G•un Hrs

5 222 Reed

SP-111 -KM

Q-31674 3-11.1

939

1119

17.50 4000 100

1-1-I Core Point

250 14.3

leas 65.75

IC

216 heritage

I P--55 (PVC) C-119 Open

1119 1192.2 6.00

5-1000

70-15 Good

Jailed 3.2 0.5

Core 6.0

Time Depth Tensity

Mud Gradient Vis PV

YP Gels pH

water Loss

Filter Cake Sand

11:00 hrs

1192 m 1070

10.49 42

9.5 10.2

1.5 mm

Pulp Mo. 1 Pump No. 2 Make National Iwo Model 1P-î0 D-700 liner X Stroke 140 r 203 140 x 406 $PM 100

Pup Rate 0.93 Civic Pump Efficiency 100 1

Pump Pressure 19)0 kPa

Drillpipe AV 33 a/min Drillcollar AV 59 utile Nozzle Veloc. s'sec

Solids

Oil Pf;1f MET

Cl

Mud Cycle 150 win :.ttoas Op 44 sin Mud Tanks 102 m3 Hole Volume 3$ a3 System Vol. 140 m3 MUD ADDITIVES SURVEYS

Ca

Sulptia.es

SL=KER MAKE Payne & Harris (dual sbakers) SHAKER MESH 2 p 60 x 10

Gel Caustic Soda Lignite Peltex Live

CaC12 SAPP A.lconer

acid Sawdust SEA II Poly Plus ,Mud Check? Mud Daily Cost Mud Cum Cost

13 sx

1 pail

2 pails 2 pails

No $113

$25,539

Mud Co.

Mud Engineer Mudded Up @

U Brig Fluids lig Cheri:

301 aKE

SOLIDS CONTROL DESILTER CEMTRIFDGF

C.F. Ikg!13) fisher De-Saterimg System

VOLUMES Vol I1(min) Operating Con wtr Hauled Losses to Form.

5655 hbls Nil

0.F. ikg 413) ours

I

BUTTONHOLE ASSEMBLY (No., Iten, OD, I), TJ Type)

PDC Core Bit, Core barrel 102mm 12-DC (17141000), Jars, r-over ssb

BHA Length 165.91 m

r 171mm x 1141, 2 x-over subs, •

Book Load 40,000 dal

Avail ODB 18,000 Jts DP on Racks 73 11141m, 4 1,2111 its DP in Hole 108 Jts DP on Location 111

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Service

Survey /apple BOP

Pressure Test

)Condition Hole 'Casing

Cement

Casing Bowl Rig Up Tear tie „Slip Cut

W.CC Drillout Cmt

1 1/4

3/4

Coring Logging DST

Circ Samples Ream Rathole Handle Tools

Rig Repair Pealing

6

1

7

Lost Circ work Pipe

Fishing wait on Orders Recover Core

Total firs

I

24

RSPP kPa;SPl Max Csg Press

Calc Hole Fill Act Hole Fill last BOP Drill:

Daylight Crew Afternoon Crew Graveyard Crew

250 p 50 3750 kPa 7.12 a3

7.41 m3

11:00 Mrs 92-02-02 17:00 Mrs 92-02-02

!SHOCK SUB IS K, Make, Days in Hole: Mason Jars, 16 days

Spud C< Drl Out Shoe C 'Back Drlg C 1st Log C

13:00 hrs 92-01-01 Surf TD €

Core Pt € ETD Bit Stop Drl3 Ê Rig Release F

~1

`4 HOUR SUMMARY 00 hrs 92-02-02. Continue reaming out doglegs in oriented (directionally drilled) bole from 1085 to 1119411® to 07:00 . Caned mud talks, pump dawn increased density fluid, to 07:15 hrs. POEM to 10:00 brs. Pick up and make up core Is and 21641, FCC core bit with heritage Diamond Products to 11:00 hrs. III with core barrel to 13:00 hrs. Drop ball

cut Core 11: 1189 to 1192.2AKB. Core jammed off to 19:30 hrs. POOH with core barrels to 21:30 hrs. Recovered 3m of core, fractured and steeply dipped shale, to 22:30 hrs. III with core barrels to attempt Core 12 to 24:00 hrs 92-02-02.

Strap t Board Tall; JMeasurement Made Corr.? SOQaDR2`,1i.S 2'3,92

EIERCON WAR EERINC LTD.

S4Dt2u I P

1DA I- I_. Y R E]P Q R'I'

WELL: SOQUIP ST-PLAVIEI l0. 8 REPORT 1: 21 DATE: 92-02-04

DEPTH: 1218 mILB ID PROGRESS: 26 ■ in 13 3 4 rotating hours (last 24 hours)

OPER @ 0600hrs: Directionally Brig @ 1234018 ID 53 1/br) FOREMAN: Wilf Krav* MOBILE NO.: (4111 721-3648 DAILY COST: $24,113 BOLE OOP.: Good WEATHER: Clear TOOLPLSBER: Gerry Ouimet

CEN COST: $159,322 CONTRACTOR: latex 1 TENP.: -10 C T.P. MOBILE. (418) 728-2631

FORMATION: Quebec City K.B. ELEV.: 143.55 ■ ROADS: Fair MOBILE CHANNEL: N/A

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No.

Site (®) Mfg.

Type

Serial i Morzles From To

Ezs on Bit

108 (dal)

RPK Condition Pulled For?

Meters n br Cum Hrs

2C

216 Heritage

11P-55 (PDC)

•t 1C Opel 1192.2 1195

3.75 5-7000 15-110

Good Jammed 2.8 0.7

Core 9 3/4

6 •t 222 teed

NP-51A-JK

II f4 1-9.5

1195 1218

10.00

10000 120

Drilling

23 2.3

216.00

Tine

Depth

Density Mud Gradient

Nis PV

YP

Gels

pi pater Loss

Filter Cake Sand Solids Oil

Pf!1f MB7

Cl

Ca

Sulphates

Bud Co.

Mud Engineer Budded Dp @

22:00 hrs 1213 r 1075

10.54

45 12

5 1.0/1.5

9.0

9.1 1.5 a trace 0.047 ail

0.25/0.8 43

0 350

NI Drlg Plaids

Dave 301 NKR

Pump No. 1 Pump No. 2 Make National Rom Model 8P-î0 D-700 Liner I Stroke 140 x 203 140 r 406

SPN 120

Pump Rate 1.1 13/min Pump Efficiency 100 4 Pulp Pressure 6500 kPa Drillpipe AV 39 1/tin Drillcollar AV 70 1/1în Nozzle Veloc. 86 1/sec Bud Cycle 122 sin Bottoms Up 35 lin Mud Tanks 102 al Hole Volume 38 m3

System Vol. 140 m3 MILD ADDITIVES SURVEYS

Gel

Caustic Soda Lignite

,Peltex

Line

CaC12 SAPP Alcomer

Acid Sawdust SHA II Poly Plus Bud Check?

Mud Daily Cost Mud Cum Cost

14 sx 2 so

1 pail

2 pails 4 pails

Yes

$1,321 $26,860

0.4571 @ 1179

0.45271 @ 1187

0.96321 @ 1197 1.2530€ @ 1206 1.65241 @ 1216

SHAKER MAKE Payne i Barris (dual shakers) SHAKER BBB 2 6 60 x 80

SOLIDS CONTROL

DESILTER C.F. (kg/13) Fisher De-Vatering

Vol (l;ain) Operating

O.F. (kg/a3)

Hours

CENTRIFUGE System

VOLUMES Cum Wtr Hauled Losses to Form.

5805 bbls lil

BO IOMHOLE ASSEMBLY (No., Iten, OD, ID, TJ Type)

Bit, Lou Speed pad, rover sub, DC, 3-DC's, Jars,

BRA Length Avail NOB Jts DP in Hole

171mm Sperry Ad] 1-louel DC, Hang]2-DC's, s-over 174.14 s

Ind Motor Ow -Off Sub (c/w sob, 134mm Tapered

Hook Load

Jts DP on Racks Jts DP on Location

1.5 deg BR A 2162

IND probe and tom), Blade Reamer,

52,000

screw-au 1-lonel

DP dal

(114mn, 4 1/21E) 181

19,000 71 110

DRIT.T.ING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping Rig Service

,Surrey Nipple BOP

Pressure Test Condition Hole Casing

Cement

Casing Bowl Rig Up Tear Out

Slip Cut wC5C jirilloat Cat

10

6 1/4 1/4

1

3/4

Coring Logging DST

Circ Soapier Rear Rathole Handle Tools

Rig Repair Reaming

3 3/4

1 1/4

3/4

Lost Circ Work Pipe Fishing

Wait on Orders

Total Hrs 24

RSPP kPaiSPM Max Csg Press

Calc Hole Fill Act Hole Fill

Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

2000 @ 68 3736 kPa 7.32 13 7.45 13

11:00 hrs 92-02-02 17:00 ors 92-02-02

SHOCK SUB (S N, Make, Days in Hole( Macau Jars, 17 days

Spud f Drl Out Shoe €

Back Brig @ 1st Log €

13:00 brs 92-01-08

13:00 hrs 92-02-03

Surf ID @ Core Pt t

ETD f Bit Stop Brig CI

Rig Release É

.24 HOUR SUMMARY

00:00 hrs 92-02-03. Finish RIB with core barrels for second coring run to 00:45 hrs. Cat Core lo. 2: 1192.2 to 1195mIB,

core jawed off again, to 04:30 hrs. FOCI, recover core (found fractured, steeply dipped shale again) to 07:00 his. Function blind rams and set brakes to 07:15 hrs. tad: back core barrel. Pick up low speed mud motor and NA) tool to 09:00 hrs. III to 10:00 brs. Slip and cat drilling line to 10:45 hrs. RIM and break cire every 10 stands to check I D function to 12:15 hrs. leas out cored rathole with and motor (rotating) from 1129 to 11950103 to 13:00 hrs. Directionally

r

ill from 1195 to 12181KB ND with low speed mod motor and surveys (orient every single to build angle back toward well center), drilling very slowly, to 24:00 brs 92-02-03.

1Strap t (Board Tally SOQ8DR28.XLS 2 452

fNeasurelent

LNade Corr.? 1 ENERCON ENGINEERING LTD.

;Strap @ !Board Tall; _ 1Measarement Made Corr.? EMERCON ENCIMEIRING LTD. SOQ8DR29.X'LS 2 5 92

SOQ[I = r' i7Is4.1.L..Y ©Rl T.IING REPQRT WELL: 90QU1P ST-fi.AVlla ma. 1 REPORT I: 29 DATE: 92-02-05 --'

DEPTB: 1283 ID ID PROGRESS: 70 ■ in 21 rotating hours (last 24 hours)

OPER C 0800hrs: Trip Out to Pick Up Notary ®A ! 1311mKB FOREMAN: Wilf kravcbuk MOBILE NO.: (418) 728-3648

DAILY COST: $30,462 BOLE COND.: Good WEATHER: Blowing Soon TCOLPUSHER: Gerry Oniaet

CIA COST: $849,781 CONTRACTOR: tales L TEMP.: -12 C T.P. MOBILE: (Ill) 728-2631

FORMATION: Trestoa K.B. ELEV.: 143.55 a ROACS: Very Poor NOBILE CHANNEL: a/4

BIT PERFORMANCE DRILLING FLUID PUMPS Bit No. Site (roi)

Mfg. Type Serial f Mottles

From To

His on Bit

++OB fdaNi RPM Condition 'Pulled For?

Meters n hr Cun fix's

6 tt 222

Need HP-551.k-Jt um 3-9.5

1195

1284 31.00

10-17000 40-130

Drilling

93

3.0 237.00

Tine

Depth

Density tud Gradient Vis

PV

YP Gels pH mater Loss Filter Cake Sand

Solids Oil Pf rNf MT Cl Ca

Sulphates

Mud Co. 1(ud Engineer Mudded Co @

24:00 hrs 1288 ■ 1060 10.39 43

9.5 9.8

1.5 mn

III Brig Fluids tig Cheri: 301 tl03

Pulp No. L Pump No. 2

lake national Masco ..-1 SP-80 D-700

Hier X Stroke 140 x 203 140 x 406 PM 120

Pump Rate 1.1 13islm

Pusp Efficiency 100 t Pup Pressure 6800 kPa m illpipe AV 39 1 sin n illcollar AV 70 •.'sin l ottle Veloc. $6 s•sec

ud Cycle 129 sin Bottoms Up 36 sin ud Tanks 102 al ole Volune 40 n3 ysten Vol. 142 13 MUD ADDITIVES SURVEYS

Gel austic Soda

Lignite

Pelter Lime

aC12 S'-.PP Alconer

Acid

wdust SBA II

Poly Plus Mud Check? Mud Daily Cost Mud Cum Cost

4 pails to

$903 $27,763

2.55241 6 1225 3.5516E 4 1235 4.2S22E I 1244

2.0520E @ 1254 3.9519E @ 1263

MAKER MAKE Payne i Barris (dual shakers) SHAKER MESH 2 @ 60 x 80 SOLIDS CONTROL

DESILTER

C.P. (14g33) Fisher Ileiiatering

dol ini} Operating

•.F. (k

(lg n3

n

1 ours

CENTRIFUGE Systes

VOLUMES Cun Wtr Hauled Losses to Fore .~

5955 bbls ail

BDTTOP4lOLE ASSEMBLY 1Mo., Item, CO, ID, II Type)

iii#, UN Speed pad, 1-over sib, DC, 3-DC's, Jars, BHA Length Avail WOB Jts DP in Bole

171a Sperry Ad} 1-loael DC, tang 12-DC's, rover 174.84 ■

Mid Rotor c/v -Off Sob (c/v sub, 144nn Tapered

Book Load Jts DP on Racks Jts DP on Locat

1.5 deg ® E 216 MID probe and lelser),

Blade leaner, 53,000

screw-as 1-k el

DP daN f114mm, 4 1, 211) 181

19,000 63 118 on

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Service

Survey Nipple BOP Pressure Test

ondition Bole Casing

Cenent

Fin Cp'Tear Out

Slip Cut iCC prillout Cat

Casing Bowl pud

21

1/2 2 1/2

Coring Logging

DST Circ Se/pies Ream Rathole Handle Tools

Rig Repair Reeking

1

Lost Circ work Pipe

Fishing Wait on Orders

Total Brs 24

RSPP kPa/SPM Max Csg Press

Calc Hole Fill

Act Hole Fill

Afternoon Crew Graveyard Crew

Last BOP Drill: Daylight Crew

2000 @ 63 3780 IPa

11:00 tirs 92-02-021 17:00 tirs 92-02-02

'SHOCK SUB IS M, Make, Days in Holed Mason Jars, 14 days

IlDr1 t Out Shoe C

(Back Drig @ 1st Log @

13:00 tits 92-01-08 Surf TD @ Core Pt t

FTD @ Bit Stop Drlg @ Rig Release @

II i1

'24 HOUR SUMMARY 1:10:00 tirs 92-02-04. Directionally drill from 1214 to 1246WB ID with low speed and 'motor and If$) surveys (orient 1 ,every single to build hole inclination back i and keep well ailed toward well center), drilling very slowly, to 11:45 hrs. Rig sery and function pipe rams to 12:00 hrs. Directionally drill ahead w/ combination orienting and rotating from 1246 to

112691413 ND {at 15000 dal i)8 obtained penetration rates of $ u/br and better). Found that even with increased we and rotating that bole inclination vas dropping (normally this Bea should build &ten rotated). leturn to orienting to build

Thule inclination from 1269 to 1288M(4 ND, surveying every single, to 24:00 tirs 92-02-04.

i I l I

SQQiJ S P 17,AZLY DRZLL=NG REPalEt'I' WELL: SOQDIP ST-FLAV1E>t L t REPORT l: 10 DATE: 92-02-06 DEPTH: 1347 dB NO PROGRESS: 51 m in 9 1'2 rotating hours (last 24 hours) OPER @ 0800hrs: Rotary Drilling 222mi Iole @ 14041KB FOREMAN: Will Kravis.* MOBILE MO.: 1411) 723-3641 DAILY COST: $28,360 HOLE COND.: Good WEATHER: overcast TOOEPCSHER: Gerry Omimet CUD COST: $911,114 CONTRACTOR: latex 1 TEMP.: -8 C T.P. MOBILE: (411) 721-2631 FORMATION: Chary K.B. ELEV.: 143.55 m ROADS: Poor MOBILE CHANNEL: I/1 BIT PERFORMANCE DRILLING FLUID PUMPS Bit No. Size (ne) Mfg. Type Serial i Nozzles Frog To Has on Bit Will idal) RPM Condition Pulled For? Meters n hr Cue Has

6 RR 222

teed IP-51A -JD

tt I4 3-9.5 1195 1311 35.50

10-17000 10-110

3-3-0 1mm Charge BR

116 3.3

241.50

7 222

Reed 111-511-JK

R-55171 3-8.7 1311 1347 5.00 18000

10 Drilling

36 7.2

246.50

Time Depth 'Density

ud Gradient 'his PV YP Gels pH hater Loss Filter Cake Sand Solids Oil Pf,Mf MET Cl

Sulphates Mud Co.

d Engineer udded Up Ë

24:00 his 1347 m

1075 10.54

42

9.5 10.2

1.5 gm

IT Dig Fluids Rig Cheri

301 )41B

Pump No. 1 Pump No. 2 Make National Basco Model 8P-80 D-700 Liner X Stroke 140 x 203 140 x 406 SPM 120

Pump Rate 1.1 143/tin Pump Efficiency 190 t Pump Pressure 7500 kPa lhillpipe AV 39 r/min Drillcollar AV 70 vain Nozzle Veloc. 103 n asec Mud Cycle 131 pin Bottoms Cp 39 min Mud Tanks 102 r3 Hole Volume 43 n3 System Vol. 145 m3 MUD ADDITIVES SURVEYS

Gel austic Soda

Lignite Peltex Lice aC12

SAPP Alconer Acid

.wdust SEA II Poly Plus I ud Check?

ud Daily Cost Mud Cum Cost

15 sx 1 sk

4 pails 10

$1,120 $28,183

3.35191 @ 1272 3.3325E @ 1212 3.7S351 @ 1291 1.45371 @ 1301 4.7529E @ 1311 5.1528E @ 132011/PLUNKS 5.05268 @ 1330 4.9525E @ 1331

SHAKER M}XE Payne A Harris 1dua1 shakers) 31AKEP, MESH 2 @ 60 x 80 SOLIDS CONTROL

DES1LTE2 C.E. (kg r31 Fisher De-0atering Vol ("lain) Operating O.F. ikg 13) Hours

CENTRIFUGE System

Con Wtr Hauled Losses to Form.

6105 bols tit

BOTTOMHOLE ASSEMBLY INo., [tea, CO, ID, TJ Type) Bit, lB Stab, 2Panel, 3-DC's,

BHA. Length 17ail 1t)B lots DP in Hole

-string INS, short Jars, 12-DC's,

176.79 u

DC, 2-string r-over sub, tapered

Book Load Jts DP on Racks Jts DP on Location

IBS, Ansel DC, blade reamer,

51,000

IDS 1W

dal 1114mn, 4 l'2111 121

19,000 58 123

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Service Survey Nipple BOP Pressure Test Condition Hole Casing Cement Casing Bowl Pig Up :Tear Out Slip Cut iiOC Drillout Cat _

9 1/2 5 1/2

1 1{4

Coring Logging DST Circ Sanpies Ream Rathole Handle Tools Rig Repair Reasina

1 1/2

6 1/4

Lost Circ Work Pipe Fishing Wait on Orders

Total Hrs 24

RSPP kPaiSPN .x Csg Press .lc Hole Fill

Act Hole Fill Last BOP Drill: u.ylight Crew Afternoon Crew

}Graveyard Crew

2500 @ 68 3736 kPa 7.52 13 1.15 m3

j

11:00 has 92-02-021 17:00 his 92-02-02)j

%HOCK SUB SN, take, Dais in Hole1 Mason Jars, 19 days it

1 Spud $ 1 13:00 hrs 92-01-01 Surf TD k Erl Out Shoe k Core Pt k Back Dr1g k 18:15 his 92-02-05 FIT 1st tog k Bit Stop Drlo F 05:00 brs 92-02-05

Rig Release k

24 HOUR SUMMARY 00:00 has 92-02-05. Directionally drill from 1296 to 1311,KB ND with low speed mud tutor and DID surreys (orient every single to build bole inclination back up and keep well aimed toward well center), to 05:00 hrs. P031 and strap out to 08:00 hrs. Handle tools, lay down mud motor, change BHA to locked-up BRA to 09:30 hrs. III with new bit, break circ every 10 stands to check NNA fwnctioe, to 12:00 hrs. Ream out oriented bole with locked -tp IBA from 1119 to 13111 KB MD (reamed 72n in 6 1/4 brs @ 11.5 i/hr) to 11:15 hrs. Rotary drill ahead with locked-up MIA from 1311 to 1347m1B MD, survey every single with INdl to 24:00 hrs 92-02-05.

Strap k 1311 m1B 1Board Tail, 1311.03 m fHeasureoent 1311.16 ■ Made Corr.? 0.13m cliff, No SOQSDP.30.1LS 2 6 92

ENER03N ENGINEERING LTD.

[7ASI~Y L7T2TLLTNG i2EI~43R'3D NELL: SOQO[P ST-Ft/VIE' 10. 8 REPORT t: 31 DATE: 92-02-07

DEPTH: 1455.5 dB PROGRESS:. 105.5 • in 13 3,4 rotating hours (last 24 hoard

OPER F 0800hrs: Inspect Core Barrels after Jailing Off FOREMAN: Wilt Krim :tat MOBILE NO.: (415) 72$-3648

DAILY COST: $20,258 HOLE COND.: Good WEATHER: Overcast TOOLPUSHER: Gerry Omieet

C.71 COST: $931,402 CONTRACTOR: laley 1 TEMP,: -11 C T.P. MOBILE: (415) 725-2631

FORMATION: Beeknantowe K.B. ELEV.: 143.55 r ROADS: Pair MOBILE CHANNEL: 1/A

BIT PERFORMANCE DRILLING FLUID PUMPS Bit No. Sine (en) Mfg. Type

Serial f Nozzles Fro. o

rs on Bit

,i06 (del) RPM

ondition

Pulled For? eters

1:r Hrs

7 222

Reed I -511-JK 1-55571 3-8.7

1311 1454 17.00

15000 110

5 2-0 is Cote Paint

143 8.4

258.50

1 C 216

Neritage

1DP-22 (Dia.)

CT-50515 Open ,PV

1454

1455.5

1.75 6-9000 70-110

Coriag

1.5

0.9 1.75

Tile Depth Density Mud Gradient Nis

YP Gels

pH

water Loss

Filter Cake

Sand

Solids oil Pf;Mf NBT

Cl Ca

Sulphates Mud Co. Nud Engineer Budded Up @

24:00 lire

1080 10.59 43

9.5

10.4 13 s

NI Drlg Fluids Rig Check 301 dB

. Pump No. 1 Pump Ko. 2 Make National 6msco II

alodel PP-80 D-700

Liner I Stroke 140 r 203 140 z 406

SPM 110

Pup Rate 1.02 13/min i

Pump Efficiency 100 E Pup Pressure 7000 kPa Drilipipe AV 36 c ùn Drillcollar 1V 65 a:iia Nozzle Veloc. a'sec Mud Cycle 134 tin Bottoms UP 42

sin Stud Tanks 102 n3 Hole Velu a 46 a3

Systea Vol. 145 a3 MUD ADDITIVES SURVEYS

C-el austic Soda

Lignite Peltea Lice

.C12

SAPP 4lconer

Acid .wdust

SEA II Poly Plus ud Check? ud Daily Cost Mud Cum Cost

15 se

1 pails

No $871

$29,754

4.6525E @ 1344 4.5523E @ 1357 4.3522E @ 1367

4.1520E @ 1377 4.0520E 8 1386

3.9520E @ 1395 3.8S2011 @ 1404 3.4520E @ 1414

3.1520E @ 1423

2.8519E @ 1443

SHARER RAKE Payne & Parris (dial shakers) 1 SHAKER MESH 2 8 60 z 80 SOLIDS CONTROL

DESILTER U.E. ikg1131 Fisher De-catering

Vol (lr4in) Operating O.F. (kg/n3) Hours

ii CENTRIFUGE System

VOLUMES

Cue Wtr Hauled Losses to Form.

6255 bols

iii BOTTOMHOLE ASSEMBLY iNo., Item, OD, ID, TJ Type1 Core Bit, Core

12-DC, Jars, 3

BHA Length Avail NOB Jts DP in Hole

Barrel (102mm r DC, i-over sub,

165.91 a

171îm 118m), 2 DP

Book Load Jts DP on lacks Jts DP oa Location

i-over sobs,

56,000

I I

daM 1114x, 4 1,2%BI 151

19,000 45 136

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping Ria Service Survey

Nipple BOP Pressure Test Condition Hole

Cement

Rig Cp Tear outJ Slip Cut WOC Drillout Cat

Casing Pealing

Casing Bowl Spud

12 4 3/4

3

1/2

Coring Logging DST

Circ Samples

Real Rathole Handle Tools Rig Repair

{SHOCK

1 3/4

1 1/4

Lost Circ

Work Pipe Fishing Wait on Orders wash to Bottom

Total Hrs

1/4

24

RSPP kPa/SPN Mar Csq Press Calc Bole Fill

Act Hole Fill

Afternoon Crew Graveyard Crew

Last BOB' Drill: Daylight Crew ,

3400 @ 64 I

3720 kPa jl

7.49 m3 7.60 m3

ÎI

11:00 brs 92-02-021, 17:00 brs 92-02-0211

SUB IS,N, Bake, Days in Holei Mason Jars, 20 days

f Dr1 Out Shoe C.

Back Drla C 1st Loa t

13:00 hrs 92-01-04 Surf ID Ë Core Pt C 15:00 brs 92-02-06 FTD € I Bit Stop Drla , Ria Release f

24 HOUR SUMMARY 00:00 hrs 92-02-06. Rotary drill with locked-up BHA from 1347 to 1454mKB MD (second major core point), survey every '

single with IND tool, to 15:00 hrs. Circ and coed mud and bole to 15:30 hrs. FOCI and strap out to 18:00 hrs. Randle

tools aid pick up core barrel to 19:15 hrs. 111 with core barrel to 21:30 hrs. Wash to bottom 16a and gun broken bit inserts off bottom to 22:15 hrs. Cat Core /3, Dolomie A, 1454 to 1455.510 to 24:00 brs 92-02-06.

strap @ 1454 mBB 1Board Tally 1454.00 it 'Measurement 1454.43 a 1Made Corr.? 0.41m Jiff, No 5O081230.11S 2 " .101i ENG INFEpIA~LfD.

S OQ U I.P I7AJf i_.Y DRZI.I~TNG 12EE~01:2T WELL: SOQULP ST-MARIE R0. 3 REPORT 1: 32 DATE: 92-02-01

DEPTH: 1463 i$D ND PROGRESS: 7.5 a in 9 1 2 rotating hours (last 24 hours)

OPER € O800hrs: Circ Out Cas Kick M 1415003 FOREMAN: Milt grinds* MOBILE NO.: (411) 721-3641

DAILY COST: 630,912 HOLE COND.: Good WEATHER: Moving Smov TOOLPUSHER: Gerry toilet

j

ai( COST: 6%9,314 CONTRACTOR: (tale' 1 TEMP.: -I1 C T.P. MOBILE: (411) 723-2631

FORMATION: badminton K.B. ELEV.: 143.55 ■ ROADS: Icy Sections MOBILE CHANNEL: R/A

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit Mo.

Size (m) Mfg.

Type

Serial 1 Nozzles From To

His on Bit WDB (dal) RPM Condition Pulled For?

Meters u'hr Cun Hrs

3 C 216

leritage

ID1F-22 (Dia.)

CI-50525 Open 1454

1457.5 5.25 6-7000

70-110 Good

Jammed 3.5 0.7 15.00

4 C 216

Ieritage RI1-22 (Dia.)

H 43C

Open 1457.5

1463

6.00 6000 75 Good

Finished 5.5 0.9 21.00

Tine

Depth Density

Mud Gradient is PV

YP Gels

pH Water Loss Filter Cake Sand

Solids Oil Ft Mf MBT

Ci Ca

Sulphates Mud Co. Mud Engineer Mudded Up K

16:30 brs

1463 a 1095

10.74

44 15 5

1.011.5

10.0 9.0

1.5 m trace 0.06

0.4/0.9 42

400

HI 0 1g Fluids Tim

301 ell

Pump No. 1 Pulp No. 2 Make Rational Bosco

'Model 1P-80 D-700 Liner I Stroke 140 z 203 140 i 406 SPN 120

Pump Rate 1.1 13;tin Pop Efficiency 100 1 Pump Pressure 7500 kPa Drillpipe AV 39 Lain Prillcallar AV 70 'Gain Nozzle Veloc. 103 1 sec Mud Cycle 139 la Bottoms Up 42 un Mud Tanks 107 n3 Hole Volume 46 n3

System Vol. 153 23 MUD ADDITIVES SURVEYS

Gel

Caustic Soda

Lignite Peltex Lime

CaC12

SAPP Alcomer

Acid Sawdust SIA II Poly Plus Mud Check?

Mud Daily Cost Mud Cum Cost

2 si

2 pails Yes

$947 $30,701

SHARER MAKE Payne i Harris (dual shakers) SHAKER MESH 2 E 60 z 10 SOLIDS CONTROL

OISELIER CENTRIFUGE U.F. (kg/13l Fisher De-latering System

Vol il;'nin) Operating

.F. ikgim3( (Centrifuges on Active System) ours 1

VOLUMES

Cum Wtr Hauled Losses to Form.

6405 bbls lit

BOTPOMHOLE ASSEMBLY (No., Iten, OD, ID, TJ Type(• Bit, Rear-Bit Reamer, Stabilizers, 2-Monet Blade Reamer

BHA Length

Avail WOO Jts DP in Hole

2 String DC, 3-DC,

174.14 ■

TB Stabilizers, Jars, 12-DC, rover

Hook Load

Jts DP on Racks Jts DP on Location

Short DC, 2 String sub, tapered

56,000

IB

dalI

(114m, 4 1 212) 131 '

19,000 45 136

DRILLING OPERATIONS TINE BREAKDOWN WELL CONTROL

Drill Tripping Rig Serrice

Survey Nipple BOP Pressure Test Condition Hole Casing

Cement

Casing Bowl Rig Up.Tear Out

Slip Cut

WOC Drillout Cit

10 1/2 1/4

Coring Logging DST Circ Samples

Ream Rathole Handle Tools Rig Repair Rearing

9 1/2

3 1/4 "

1/2

Lost Circ

Work Pipe Fishing Wait on Orders

Total Mrs 24

RSPP kPa/SPM Max Csg Press Calc Hole Fill Act Hole Fill

Last BOP Drill: Daylight Crew Afternoon Crew Craveyard Crew

3677 kPa 7.65 m3 7.10 m3

11:00 hrs 92-02-02! 17:00 hrs 92-02-02Îi

SHOCK SUB iS N, Make, Days in Hole: Boson Jars, 21 days

Spud € Dri Out Shoe K Back Drlg €

1st Log K

13:00 hrs 92-01-01 Surf TD € Core Pt €

FTD K Bit Stop Drig K Rio Release €

15:00 hrs 92-02-06

1-24 HOUR SUMMARY l'

00:00 hrs 92-02-07. Finished cutting Core 43 from 1455.5 to 1457.5m KB (Core 13: Dolonie A, 1454.0 to 1457.510),

core jammed off, to 03:30 hrs. POOR, recovered 3.5 1, found 0.31 of rubble at bottom of core (suspect that this caused the core to jam off) to 06:00 hrs. Service core barrels, replace damaged bearings (probably caused by excessive NCO trying to =jam core), change core catcher, lay down 1-9a section of core barrel to 08:30 hrs. lit for Core 14, break circ

to 11:00 hrs. Cut Core 44: Dolomie A from 1457.5 to 1463.OmKB (kept RPM down to 75 to prevent jamming off) to 17:00 hrs. POOH to 20:00 hrs. lecovered 5.5m of core (noted rubble at top of core ubicb was apparently what caused jarring off en Core 43) to 20:30 bus. Rig sere and function blind rams to 20:45 hrs. Laid down core barrels and picked ç

locked-up IAA to 22:00 hrs. RIM with Bit FS to 23:30 hrs. Break circ and ream cored rathole (216m core size versus

2221 bit size) froal454 to 1455mî0) to 24:00 hrs 92-02-07.

Strap K Board Tally iMeasureqent

Made Corr.'. Eî1 IletNEERIMG LTD.

SOp8DR32.IIS 2 8 92

SOQi.JTP DAILY DI2TLLTNG WELL: SOQUIP ST-Fi1Vl8 M. 8 REPORT 1: 33 DATE: 92-02-09 DEPTH: 1487.5 40B PROGRESS: 32.5 ■ in 6 1 4 rotating hours (last 24 hours) °PER @ OEOOhrs: Finished Core $5 @ 1496.254KB FOREMAN: Wilf Frawchuk MOBILE NO.: (418) 728-3641 DAILY COST: $19,210 HOLE COND.: Good WEATHER: Overcast TM /PUSHER: Gerry Otimet CDI COST: $981,524 CONTRACTOR: late[ 1 TEMP.: -5 C T.P. MOBILE: )418) 728-2631 FORMATION: Beebantawm H.B. ELEV.: 143.55 ■ ROADS: Fair MOBILE CHANNEL: I/l

BIT PERFORMANCE DRILLING FLUID PUMPS Bit lo. Size (tai Mfg. `Type Serial $ lozzles From To Hrs on Bit WOB (dal() RPM Condition Pulled For? Meters aihr Cum Hrs

I 222 teed

1P-52a-J[ 1-42741 3-8.7 1463 1486 4.75

18000 80

1-1-1 Core Point

23 4.8

263.25

5 C 216

leritage 1DP-22 (Dia.)

U 13C Open 1486

1417.5 1.50 6000 75

Coring

1.5 1.0

22.50

Tile Depth Density Mud Gradient Vis PV YP Gels pH Water Loss Filter Cake Sand Solids Oil PfiMf MBT Cl Ca Sulphates Mud Co. Mud Engineer Mudded Op @

15:30 hrs 1415 ■

1150 11.28

44 17 4

1.5/1.5 9.5 6.1

1.0 a trace 0.053 mil

0.35/0.7 40

400 nil

XI Drlg Fluids Tin

301 mMB

Putp No. 1 Pump to. 2 Make National Masco Model 8P-80 I+-700 Liner 1 Stroke 140 z 203 140 z 406 SPX 120

.Poop Rate 1.1 131pin Pump Efficiency 100 t Pump Pressure 4500 kPa Drillpipe AV 39 1/tin ,Drillcollar AV 70 Cain Nozzle Veloc. ulsec Mud Cycle 148 tin Bottom Up 51 tin Mud Tanks 107 13 Hole Volume 56 e3 Systen Vol. 163 443 MUD ADDITIVES SURVEYS

Gel Caustic Soda Lignite Peltex Lie CaC12 Staflo Barite Acid Sawdust SHA II Poly Plus Mud Check? Mud Daily Cost Mud Cue Cost

6 sz 144 sz

2 pails Tes

$2,848 $33,549

SHAKER MAKE Payse i Marris (dual shakers) SHAKER MESH 2 @ 60 z $0 SOLIDS CONTROL

DESILTER U.F. (kg/m31 Fisher De-Watering Vol (1/gin) Operating

IO.F. (kg/n3) lours

0341E1FOGE System

VOLUMES Can Wtr Hauled Losses to Fors.

6555 bbls Oil

BOTTOMHOLE ASSEMBLY )11o., Iten, OD, ID, IJ Type) Core Bit (102 z 2-x-over subs,

BHA length Avail WOB Jts DP in Hole

216 ), Core barrels 12-fC, Jars, 3-DC,

165.91 1

(102a z I-over sub,

Hook Load Jts DP on Racks Jts DP on Location

171em1 z 11m), DP

56,000 dal (114mm, 4 1 21E) 181

19,000 43 131

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill ripping

Rig Service Survey Nipple BOP Pressure Test Condition Hole

sing eaent

Casing Bowl (Rig Up. Tear Out Slip Cut WOC Drillout Cat

4 3/4 4

1/2

1

Coring Logging DST Circ Samples Real Ratbole Handle Tools Rig Repair Reaping

1 1/2

1/2

1 1/4

112

Lost Circ Work Pipe Fishing wait on Orders Gas Kick 5 Mix

Height Mat.

Total Hrs

10

24

RSPP kPa/SPM Max Csq Press Calc Hole Fill Act Hole Fill Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

1600 @ 60 3516 kPa 7.60 413 7.90 .3

11:00 ors 92-02-02 92-02-08

SHOCK SUB 614, Make, Days in Hole) Mason Jars, 22 days Spud € Orl Out Shoe € Back Arlg @ Lot Loa € L

13:00 hrs 92-01-0$

00:30 ors 92-02-08

Surf TD C. Core Pt @ FTD @ Bit Stop Ong € Rig Release €

12:00 hrs 92-02-08

24 HOUR SUMMARY 00:00 hrs 92-02-01. team in with bit frog 1455 to 1463e KB to 00:30 hrs. votary drill ahead from 1463 to 1485WMB, had drilling break frog 1484 to 1485805, took 5-6 pin. flow check, to 04:30 hrs. Started to circ bottomhole sagple, well kicked (mod L above KB) to 05:00 hrs. Shut well ia, read i recorded S1DPP (could not get SICP because pipe rams bad been ; closed). Closed hydril and opened pipe rams. lammed mud talcs, circ out gas kid: (2-3. flare) until flare died, to 08:30 ii hrs. Shut pap off, took flow cheek, found well was still flowing. Continued circ thru wide-open choke, monitor =tics ii laud wt and degasser gad wt (started at 1095 kg/m3 ii, 940 kg/13 out). Well finally stabilized with no gas cut ail returns to 11:00 hrs. 01 geologist's orders, drilled 1 pore metre true 1485 to 14861KB, still had drilling break, to 11:15 hrs. Circ 1,

and miz barite, increased mud vt fro. 1100 kg/13 to 1150 kg/443 to 15:15 hrs. PC01 to Dore to 18:15 hrs. Pict up and sake up 1844 core bbl, R® with same ai.d DC's to 19:30 hrs. Slip ad cat drlg line to 20:30 hrs. RIB to 21:30 tirs. Circ, dropped ball and cutting Core 15 fro. 1486 to 1487.518 to 24:CO Ins 92-02-08. Strap @ ]Board Tally 1Nasurepent iNade Corr.?

5OQ8DR33.%LS 2i9 42

ENE FNGINEEP.ING LTD.

1DA II. 3,Y I Tic I2 ii PO]F2T -WELL: SOQUIP ST-FLAYIF3 BD. E — REPORT 1: 34 DATE: 92-02-10

DEPTH: 1496 me ID PROGRESS: 3.75 ■ in 8 rotating hours (last 24 hours: TOPER € 0800hrs: Reaming Cored lathole 4 1496AB FOREMAN: Wilf Mrarchmk MOBILE NO.: (413) 723-3643 DAILY COST: $22,716 HOLE COND.: Good WEATHER: Clear TOOLPUSHER: Gerry Onimet

CtIN COST: $1,011,210 CONTRACTOR: Ralex 1 TEMP.: -18 C T.P. MOBILE: (413) 723-2631 FORMATION: Dedtiaatarm X.B. ELEV.: 143.55 a ROADS: Blowing Snow MOBILE CHANNEL: 11/1

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit Mo. Size (ieal Mfg. Type Serial i Nozzles From To Brs on Bit ix)B (daIl RPM Condition Pulled For?

1Neters m:hr Cum Ers

5 C 215

Heritage hDP-22 (Dia.)

CI-50525 Opem 1486

1496.25 9.50 6D00

75 Good

Finished Core 10.25 1.1

30.50

ifiae Depth Density dud Gradient Vis PV YP Gels pl 'Water Loss Filter Cake Sand Solids Oil Pf-Mf MIT Cl Ca Sulphates Mud Co. Mud Engineer Mudded Cp @

08:00 has 14% m

1150 11.23

43

9.5 7.2 1 ma

MI twig Fluids Tim

301 803

Pump No. 1 Pump No. 2 Make Rational .-Kisao Model 8P-80 D-700 liner X Stroke 140 z 203 140 z 406 SPM 120

Pulp Rate 1.1 143;ain

Pump Efficiency 100 3 pap Pressure 4700 kpa brillpipe AV 39 al.ie Drillcollar AV 70 wain Nozzle Veloc. m ' sec Mud Cycle 143 min Bottoms Up 51 min Mud Tanks 107 m3 Hole Volume 56 03 System Vol. 163 m3 MUD ADDITIVES SURVEYS

Gel Caustic Soda Lignite Peltex Lime CaC12 Staflo Barite ~Acid Sawdust SKI II Poly Plus Mud Check? Mud Daily Cost Mud Cum Cost

1st

1 pail No

$354 $33,903

SHAKER MAKE Payne i Harris (deal shakers) SHAKER MESH 2 @ 60 z 80 SOLIDS CONTROL

DESILTER C.F. (kg/m3) Fisher Re-Watering Vol illminl Operating O.F. (k043) Hours

CENTRIFUGE System

i

VOLUMES Cue G'tr Hauled Losses to Form.

6705 Nils Iii

BUTTONHOLE ASSEMBLY No., Item, OD, ID, TJ Type: DST 11: Conventional 15-DC, z-over sub,

BHA Length Avail ii3B Jts DP in Hole

packer 1971m DP

171.46 ■

z 31.67m (see

Hook Load Jts DP on Racks Jts DP on Location

DST report),

38,000

i

dal( ilUe•, 4 1/2%1) 181

18,000 40 141

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Service Survey Nipple BOP Pressure Test Condition Hole Casing 'Cement Casing Bowl Rig Up:Tear Out lip Cut

SDr WOC

i llout Cot

5 1/2 Coring Logging DST Circ Samples Ream Rathole Handle Tools Rig Repair Reaming

3

6 3/4

3

Lost Circ work Pipe Fishing wait on Orders Pull DST Free

Total Hrs

3/4

24

FSPP kPa:'SPM Max Csg Press Calc Hole Fill Act Hole Fill Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

1500 @ 65 3516 kPa 7.6E m3 3.00 ml

92-02-09 92-02-09 j

SHOCK SUB (S'14, Make, Days in Hole: Basal Jars, 23 days

Spud € Drl Out Shoe € Back Ong € 1st Log €

I 13:00 brs 92-01-04 Surf TD € Core Pt € FlD € Bit Stop Trig € Rig Release €

y 24 HOUR SUMMARY b0:00 brs 92-02-09. Finish cutting Core 15 to 1496.25.(®, (total 1486. to 1496.25, cut 10.250 in 9.5 hrs), Beetaamtoi

LIP

to 08:00 hrs. Flow check and POOH, recovered 10.25m of core, to 11:00 hrs. Pick up DST tools, service same and make same to 14:00 hrs. RIB with DS? 11 to 16:30 brs. Set 3000 dal on tools to set conventional packer, open tool and

test. DST 11: 1479 to 14960103, Beeksantowm, 5-60.90-225, GTS (see DST report) to 23:15 hrs. Pulled free, condo ted flow check, well static, to 24:00 hrs 92-02-09.

Strap € IBoard Tall }Measurement Made Corr.? - SOQ8DR34.ti'15 210-92

S 4QU 2 P D).2L.Y E)RTLI.TNG REPORT ytgLL: SOQOIP ST-fLAVIII ID. 8 REPORT I: 15 DATE: 92-02-11

DEPTH: 1511aKB ID PROGRESS: 22 n in 8 rotating hours (last 24 hours)

OPER P 080Ohrs: P0OR with Core 16 8 1524.5uuR8 FOREMAN: Will Krarukodc MOBILE NO.: (418) 728-3641

DAILY COST; $18,767 HOLE CORD.: Good WEATHER: Clear TOOIPUSHER: Gerry Oaimet

CUM COST: $1,003,007 CONTRACTOR: Rolex 1 TEMP.: -11 C ' T.P. MOBILE: (41$) 721-2631

FORMATION: Dolosie B K.B. ELEV.: 143.55 a ROADS: Pair MOBILE CHANNEL: 1/1

HIT PERFORMANCE DRILLING FLUID PUMPS Bit No.

Sire (.1 Mfg.

Type Serial I Nozzles From

To Hrs oo Bit WOB (dal) RPM Condition

Pulled For?

Meters

nbr Cum firs

9 RI 222 Reed

W-521-J8 Il jl

3-1.7 1496 1514 5.00

11000 SO

3-3-I Core Point

11

3.6 261.25

6 C

215 leritage

LP-22 4Dia.) 01-50525

Open 1514 1511 3.00

6000 75

Coring

4 1.3 33.50

Tiae

Depth Density Mud Gradient Vis PI

YP Gels pH Water Loss

Filter Cake Sand Solids

Oil

Pf;11f

MBT

Cl, Ca

Sulphates (Mud Co. Mud Engineer Mudded Up @

24:00 hrs 1517 m

1140 11.11

45

9.5 7.4 1 me

II Drlg Fluids Rig Check 301 mKB

Pulp No. 1 Pump No. 2

Make National Model 8P-80 D-700

Liner I Stroke 140 t 203 140 t 406

SPM 120

Pump Rate 1.1 al/min

Pulp Efficiency 100 4

Puap Pressure 5000 kPa

Drillpipe AV 39 miain

Drillcollar AV 70 armin

tiotzle Veloc. mrsec

Mud Cycle 150 min

Bottoms Up 53 min

Mud Tanks 107 e3

Hole Volune 58 n3

System Vol. 165 m3 MUD ADDITIVES SURVEYS •1 .ustic Soda Lignite

Peltex Line

• 12 Staflo 4. ite

Acid .wdust

HA II

.ly Plus

ud Check?

Daily Cost ad Cua Cost

2 sr

12 sz

2 pails No

$595 $34,498

2.75513881494 SHAKER KAKI Payne A Harris (dual shakers) SHAKER MESH 2 8 60 x 80 SOLIDS CONTROL

DESILTER G.P. (kg/t3) fishes Dc-Watering

Vol (l/min) Operating O.F. fkg/e34 Hours

CENTRIFUGE System

VOLUMES — L1m Wtt Hauled Losses to Fora.

6855 bbls Nil

B0TT0MH0LE ASSEMBLY Ito., Item, OD, ID, TI Type'

Core Bit 102nn

z-over sub, 12-DC,

BHA Length Avail MOB Jts DP in Hole

t 21511, Core Barrel Jars, 3-DC,

165.91 a

102x4 t 1711/8 1-over sub, DP

Hook Load Jts DP on Racks Jts DP on Location

t 181,

56,000 dal (114m, 4 1.211) 111

19,000 38 143

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping

Pig Service Survey Nipple BOP Pressure Test Condition Hole

Casing

Cement

Casing Bowl

Rig Up teat Out

1:6lip Cut

Drillout Cat

5 10 1/4 1/4 1/2

Coring Logging DST Circ Samples

Ream Rathole Handle Tools Rig Repair Reaeiog

3

3

1 1/4

Lost Circ

Work Pipe Fishing fait on Orders Wash to Bottom

Total His

3/4

24

ISPP kPa.SPN Mar Csg Press

Calc Hole Fill Act Hole Pill Last BOP Drill:

Daylight Crew

,Afternoon Crew Graveyard Crew

1500 8 80 3546 kPa

7.75 a3 1.06 m3

92-02-09 92-02-09

SHOCK SUB iS H, Make, Days in Bolel lasom Jars, 24 days

Spud f Dr! Out Shoe K

Back Drlg F 1st Log €

. 13:00 hrs 92-01-08

08:00 hrs 92-02-10

Surf TD P Core Pt 1 FTD B Bit Stop Drlg Rio Release €

13:45 hrs 92-02-10

24 HOUR SUMMARY

,i:00 hrs 92-02-10. POCK with DST 11 tools, take flow Checks, hole static, to 03:00 hrs. treat dam DSS! il, recover p ... .- and lay down DS! tools to 04:30 hrs. III with Bit /911 to 06:45 hrs. lean cored rathole from 1486 to 1496sî03 to 08:00 hrs. Rotary drill ahead with locked-up BHA from 1496 to 15041KB ND to 10:30 hrs. Survey to 11:00 h . Dig sere and function hydril to 11:15 hrs. Drill ahead from 1504 to 15141403 ND (Dolosie B core point) to 13:45 hrs.

-tatted to pall wet, pmt kelly back a, gunned tanks and nixed barite pill, spotted same. P001 dry, take flow off, hole -tatic, to 17:00 hrs. Bindle tools and make ç Dore barrels to 18:30 hrs. III with Dore barrel to 20:15 hrs. Bash dare from 1495 to 15140B, circ and drop ball to 21:00 hrs. Cutting Cbre 16 from 1514 to 15180B to 24:00 hrs 92-02-10.

Strap E Board Tally Measurement ]Bade Corr.? j

SOQ8DR35.SLS 2 L1 92

C3 Ili 1 I' 1)A Y 1312li.i_.SNG R)C1?4aI2r WELL: UUCP ST-FLAVINI D. 4 REPORT 1: 36 DATE: 92-02-12

DEPTH: 1535 ne D PROGRESS: 17 a in 15 1:4 rotating hours (last 24 hours)

OPER 10800hrs: Lotting Core f4 1 1517.51KB FOREMAN: Miff Kraut:tali MOBILE ND.: (418) 72E-3641

DAILY COST: $24,032 HOLE COND.: Good WEATHER: Overcast TOOLPUSHER: Gerry Ouiaet

CUM COST: $1,054,039 CONTRACTOR: Roles 1 TEMP.: -20 C T.P. MOBILE: (418) 728-2631

FORMATION: Dolosie B K.B. ELEV.: 143.55 a ROADS: Icy Sections MOBILE CHANNEL: 1/4

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No.

Sine junl Mfq.

Type Serial 4 Nozzles Fro'

To

Mrs on Bit 1408 (daM)

RPM Condition Pulled For? -Meters 1,11r Cum Ers

6 C 215

Seri-age DP-22 (Dia.)

C1-50525

elms 1514

1524.5

9.50

6-10000 • 75 Good

Jammed Off 10.5 1.1 40.00

7 C 215

leritage

1D1,-22 (Dia.) 01-50525 Open

1524.5

1535 9.00

6-8000 75

Good

Jammed Off. 10.5 1.2 49.00

Tile Depth Density Mud Gradient

Vis PV

YP Gels

-p8 Water Loss Filter Cake Sand

20:45 hrs

1535 a 1125

11.03 43

9.5 7.5 1 ma

Pup No. 1 Pup No. 2

Make latioaal 8•sco

Model 8P-40 D-700

liner 4 Stroke 140 x 203 140 r 406 SPN 118

Pump Rate 1.1 m3/ain

Pump Efficiency 100 1

Pup Pressure 5000 kPa

Drillpipe AV 39 a/iin

Drillcollar AV 70 main

Mottle Veloc. miser Solids

Oil Pf/Mf MBT

Cl

Mud Cycle 150 tin

Bottoms Op 53 tin Mud Tanks 107 n3 Bole Volume 58 n3

System Vol. 165 m3 MUD ADDITIVES SURVEYS Ca

Sulphates

SHAKER MAKE Payne & Harris (dual shakers)

SHAKER MESH 2 @ 60 x 80 Gel Caustic Soda Lignite

Peltex Lime

CaCl2

Staflo Barite

Acid

Sawdust SHA II Poly Plus Mud Check? Mud Daily Cost Mud Cua Cost

1 pail

2 pails to

$1,680 $36,178

Mud Co.

-Mud Engineer Mudded Up @

Ml Drlg Fluids

Rig Check 301 orb

SOLIDS CONTROL DESILTER CENTRIFUGE

U.F. (kg/'31 Fisher re-Watering System

VOLUMES Vol Wain) Operating

Cum Wtr Hauled Losses to For'.

7005 bbls lil

O.F. 1kg/131 Hours

B0T'1'OMHOLE ASSEMBLY (Ho., Item, OD, ID, TJ Type)

Core Bit 102 mm r 215mm, Core Barrel xrover sub, 12-DC, Jars, 3-DC,

BHA Length 165.91 a

1O2mm x 1711 x lta, x-over sob, If

Hook Load 56,000 daN

Avail woe 19,000 Jts DP on Racks 36 (l14ne, 4 1'2)01) Its DP in Bole 145 Jts DP on Location 181

DRILLING OPERATIONS TIRE BREAKDOWN WELL CONTROL

Drill Tripping Rig Service

Survey ,Nipple B3P Pressure Test 'Condition Hole

Casing

Cement

Casing Bowl Pig Up' Tear Ouf Slip Cut WOC Drillout Cot

6 1/2 1/4

1/2

Coring

Logging

DST Circ Sanples Real Rathole

Handle Tools

Rig Repair Reaming

15 1/4

1

Lost Circ work Pipe

Fishing Wait on Orders Recover Core

Total Ers

1/2

24

RSPP kPa;SPN lax Csq Press

Calc Hole Fill

Act Hole Fill last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

1500 @ 80

3589 kPa 7.42 m3 8.10 m3

92-02-09 92-02-09

SHOCK SUB IS N, Make, Days in Hole) Masora Jars, 25 days

Spud 4 Oil Out Shoe g Back. Drig I 1st Log @

13:00 hrs 92-01-08 Surf TD €

Core Pt I FTD F Bit Stop ()rig @ Rig Release @

24 HOUR SUMMARY :00 his 92-02-11. Finish vatting Core (6 to 1524.55KB (Core f6: 1514 to 1524.5dKB, Doloaie B, cut 10.5' in 9 1/2

) to 06:15 hrs. Core jammed off right after the connection was made. Conducted flow check, IOC and recovered core

(10.5a in 12 bores), service core barrels to 09:30 hrs. RIM with core barrel to 17:30 hrs. Circ and drop ball to 11:45 ors.

Core f7: 1524.5 to 1535'103, Dolaaie B, art 10.5' in 9 ors to 20:45 hrs. Core jammed off again lm after the

'o' (tried to jam off ever since the connectiotl. POOR with Core 17 to 24:00 Pas 92-02-11. connecti

Strap C Board Tally INeasurenent Wade Corr.? ËNERCON ENGINEERING LTD.

SOQ8DR36.%LS 2.13.92

u 1?

WILY GRILLING 32EI RZ'

WELL: 9000[P ST-VLAVII1 103. 8 REPORT I: 37 DATE: 92-02-13

DEPTH: 1540 all ID PROGRESS: Si in 8 3'4 rotating hours (last 24 hoursl

OPER R 0000hrs: UI1 with Bit 110 FOREMAN: Milf Frown[ MOBILE MO.: (418) 728-3648

DAILY COST: $22,015 HOLE COMO.: Good WEATHER: Clear T00LPCSHER: Gerry Calvet

Ct11 COST: $1,076,054 CONTRACTOR: tales L TEMP.: -16 C T.P. MOBILE: (418) 721-2631

FORMATION: Dolaaie B K.B. ELEV.: 143.55 a ROADS: Icy Sectlam MOBILE CHANNEL: 1/A

BIT PERFORMANCE DRILLING FLUID PUMPS

,Bit No.

Site ion) Mfg.

Type

Serial I Nozzles Fro% Ifo 1rs on Bit

-WON (dal) RPM Condition Pulled For?

Meters a;hr Cue Hrs

8 C

215

Heritage 1111-22 (Dia.)

a-50525 Open

1535 1540 9.00

6-8000

75 tinged

Bid Of Core 5

0.6 58.00

Tile

Depth Density Ilud Gradient

Vis

PV

YP Gels

pH Water Loss Filter Cake Sand

Solids

Oil Pf/Nf MBT

Cl

Ca Sulphates Mud Co.

Mud Engineer Mudded Cp @

12:30 hrs 1540 ■

1125

11.03 42

9.5

7.2 1 e

MI Drlg Fluids lig Check 301 mRB

Pump No. 1 Pump No. 2

hake latiaaal Basco

Model 8P-80 D-700

liner I Stroke 140 x 203 110 z 406 SAX 120

Pump Rate 1.1 13/nin

Pump Efficiency 100 1

Pump Pressure 6500 kPa trillpipe AV 39 v/tin

Drillcollar AV 70 ■;sin

Nozzle Veloc. tisec Mud Cycle 124 tin

Bottoms Op 53 min

Mud Tanks 78 a3 Hole Volume 58 a3

Systea Vol. 136 e3 MUD ADDITIVES SURVEYS Gel Caustic Soda Lignite Peltex lice

CaC12

Staflo Barite

Acid Sawdust SHA II

Poly Plus Mud Check? Mud Daily Cost Mud Cua Cost

13 sz

2 sz

1 sk

lo $453

$36,631

SHAKER MAKE Payne i Harris (dual shakers) SHAKER MESH 2 E 60 z 80

SOLIDS CONTROL DESILTER

C.F. (kg/%3) Fisher De-Watering

Vol (1/sin) Operating 0.F. (kg/n3) Hours

CE TRIFCCE System

I

VOLUMES Cum Wtr Hauled Losses to Fora.

7155 bbls Mil

BOTTOMHOLE ASSEMBLY (No., Item, 00, ID, TJ Type)

BAR' dual bottorhoie

BHA Length

Avail WS

.Jts DP in Role

conventional

180.43 v

DST tools

Hook Load Jts DP on lacks Jts DP on location

38,000

1

dal

(llama, 4 1/22) 181

19,000 36

145

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping Rig Service Surrey

Nipple BOP

Pressure Test Condition Hole Casing

Cement

Casing Bowl Fig Up Tear Out

Slip Cut VAC Drillout Cat

7

1

Coring Logging

DST Circ Samples Ream Rathole

Handle Tools

Rig Repair Reaming

8 3/4

4

1 3/4

Lost Circ work Pipe Fishing wait on Orders

Recover Core

wash to Bottom

Total Ers

1

1/2

24

RSPP kPa/SAN

Max Csg Press Cale Hole Fill Act Hole Fill Last BOP Drill:

Daylight Crew

Afternoon Crew Graveyard Crew

1500 t 80 , 3589 kPa 7.82 a3

8.00 13 i

l

92-02-09 92.02-12

SHOCK SUB (S N, Make, Days in Hole) Mason Jars, 26 days ,

Spud C

Dr1 Out Shoe @

Back Drlq C

ist Log @ Stop Coring C

13:00 hrs 92-01-08

12:30 hrs 92-02-12

Surf TD @

Core Pt C

FTD @ Bit Stop Ong R Rig Release @

24 HOUR SUMMARY 100:00 brs 92-02-12. Recover Core #3, 10.5a in 12 boxes, to 00:30 hrs. Serviced core barrel and 8TH with DC's to 01:15

)ur's. Slip and cut drilling line to 02:15 hrs. RIK to 03:15 hrs. Mash to bottom, drop ball to start coring to 03:45 hrs. Qat'

tore I8: 1535 to 1S40vRB, Dolaaie B, cut S. in 9 hrs, to 12:30 hrs. Wellsite geologist called for coring to stop, POOR to

15:30 hrs. Recovered 5a of core is 6 bores to 16:00 hrs. Handle tools, service core barrel and rack hack save to 17:00

hrs. Strap amd Ill slowly for DST 12 to 20:00 hrs. Bead up DST 12, set 8000 dal on conventional bottovbale test tools

and test to 24:00 hrs 92-02-12.

1trap C 1540 ERB JBoard Tally 1540.00 u pleasureaent 1540.30 u Na1e Corr.? 0.30a Jiff, to

SOQ8D13' LS 2!13 .

S .F' 1.7A1 LY 13I2 RT i4 ELL : SOQOIP ST-FLAVIKI NO. 1 REPORT /: 38 DAII: 92-02-14

DEPTH: 1575 AB ND PROGRESS: 15 a in 10 3;4 rotating hours (last 24 hours(

OPER C O800hrs: Drilling 222• lain Role $ 1612WK8 FOREMAN: Will Krawchuk MOBILE MO.: (411) 721-3648

DAILY COST: $28,398 HOLE WMD.: Good HEATHER: Cloudy TOOLPCSHER: Gerry Otiaet

CDI COST: $1,104,452 CONTRACTOR: Islet 1 TEMP.: -2 C T.P. MOBILE: (418) 728-2631

FORMATI01: Dolamie B K.B. ELF'.: 143.55 u ROADS: Fair MOBILE CHA NFL: 1/1

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No. Size (m) ,Hfq.

Type Serial 1 Nozzles

From To Brs on Bit

HOB (dal) RPM Condition Pulled For?

Meters athr Cum Its

10 222 Reed

1P-531-J1

N-55408

1-1.7 1540 1575

10.75 11000 70-80

Drilling

35 3.3

279.00

Tire Depth Density 'Mud Gradient

Vis PV

YP Gels

pH Water Loss

Filter Cake Sand

Solids Oil

PE,7If 7113T

Cl Ca

Sulphates

Mud Co. Mud Engineer Mudded Cp i!

24:00 hrs

1575 i 1115 10.94 13

9.5 7.6

1 •

NI Brig Fluids

Rig Check 301 the

Pulp No. 1 Pump No. 2

Make National Emsco Model SP-80 D-700

liner I Stroke 140 x 203 140 z 406

SPN 120

Pup Rate 1.1 Clain

Pup Efficiency 100 1

,Pulp Pressure 7200 kPa

)rillpipe AV 39 Csin Drillcollar AV 70 ...in

Nozzle Veloc. 103 m sec

Mud Cycle 126 sin Bottoms Cp 55 tin Mud Tanks 78 m3 Role Volune 60 13

System Vol. 138 13 MUD ADDITIVES SURVEYS

Gel Caustic Soda

Lignite Pelter Like

Soda Ash

Staflo Barite

Acid Sawdust SRI II Poly Plus

Mud Check?

Mud Daily Cost Mud Cum Cost

18 st 2 ss

1 sk 2 sz

2 pails No

$1,015 $37,646

2.75188 $ 1533 2.5S11E p 1561

SHAKER MAKE Payne G larris (dual shakers)

SHAKER MESH 2 f! 60 s 80

SOLIDS CONTROL DESILTER

U.F. (kgis3) Fisher De-Watering

Vol (1/sin) Operating

O.F. (kq:a3l Hours

CENTRIFUGE

System

VOLUMES

Om h'tr Hauled Losses to Form.

7305 bb1s Nil

BO?POMHOLE ASSEMBLY (No., Item, OD, ID, TJ Type) Bit, elf, 2-String 3-DC, Jars, 12-DC,

B8?. Length .:.rail W00 Jts DP is Hole

IB stabs, short sorer sob,

174.14 ■

DC, 2-Stritg Tapered Blade Reamer

Nook Load Jts DP on Racks Jts DP on Location

13 stabs, 2-Ioael

57,000

DC,

dal

(114mn, 4 1!2113) 181

19,000 33 148

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping

Rig Service urvey

Nipple BOP

Pressure Test

ondition Hole ing

ement

ing Bowl Pig Cp Tear Out Slip Cut OSC Drillout Ott

10 3/4 5

1/4

1

Coring

Dogging

DST Circ Samples

Ream Rat hole Handle Iools Rig Repair Reuling

2 1/2

1 1/2

3

Lost Circ Work Pipe

Fishing bait on Orders

Total Its 24

RSPP kPa/SF! Mar Csg Press

Cale Hole Fill

Act Hole Fill

Last HOP Drill: paylight Crew Afternoon Crew Graveyard Crew

1700 4 60 3618 kPa

92-02-09 92-02-12

SUB (S , Make, Days in Hole( laws Jars, 27 days SHOCK N

Spud f

,Drl Out Shoe € (Back Drlg € 1st Log k

13:00 hrs 92-11.08 Surf TD Ê Core Pt F 1

ETD Bit Stop Drlg gi Rig Release f

124 HOUR SUMMARY

hrs 92-02-13. Finish DST 12: 1514 to 1S40aKB, Dolorie B, 15-60-90-225, UCFS to 02:30 hrs. 1(81 DST 12 to

:30 hrs. Break down test tools, recover recorders, pick op locked op ®A to 07:00 hrs. LIE with Bit /10 to 09:00 hrs.

:CO[6i'esak

Circ, ream cored rathole from 1514 to 15401KB to 12:00 tars. Drill ahead 222mm main bole from 1540 to 1543)0[1

13:00 hrs. Survey to 13:30 hrs. Rig sere and function hydril to 13:45 hrs. Drill ahead from 1543 to 1571[0[0 to 22:30

. Survey to 23:00 hrs. Drill ahead from 1571 to 15751KB to 24:00 brs 92-02-13.

Strap € 'Board Tally 'Measurement 'Made Corr.? SOQ8DR38.1LS 2'14 92

ENERCOR ERCENEEPIMG LTD.

SQQU I 11? DAILY DRILLING REt?QRT

WELL: SOQUIP ST-FLAVIEN N0. 8 REPORT t: 39 DATE: 92-02-15

"DEPTH: 1670 O B MD PYOCYESS: 95 a is 22 rotating hours (last 24 hours)

OPER @ ONOOhrs: Cutting Core t9 8 1673.25x1® (cut 1.25e) FORERA(: Wilf Krawchuk MOBILE NO.: (416) 728-3648 DAILY COST: $25,884 BOLE CORD.: Good WEATHER: Clear TOOLPOSBER: Gerry 0uiaet

`(9M COST: $1,129,938 CONTRACTOR: tales 1 TEMP.: -8 C T.P. MOBILE: (411) 728-2631 'FORMATION: Dolomie C R.B. ELEV.: 143.55 ■ ROADS: Fair MOBILE CHANNEL: N/A

Z -. _ - - BIT PERPORMANCE DRILLING FLUID PUMPS

Bit No.

i:e (n) g.

hype (Serial I 'Noules From

l''fo rs on Bit

\0B (dal) RPM

Condition 'Pulled For? Meters

)I/hr Cum firs

10 222

teed HP-53A-JP R-55408 3-8.7

1540 1670

32.75 18000 80

Drilling

130 4.0

301.00

lie

6 pth

. nsity

d Gradient 'is

is

ater Loss i'ilter Cake ..Id ...lids

411 it /If

I is

20:00 brs

1656 m

1110

10.88 43

9.5 7.6

1 Is

NI Drig Fluids Rig Check 301 xKB

Pump No. 1 Pump to. 2

Bake lational Woo Model 1P-80 D-700 Liner 1 Stroke 140 x 203 140 r 406 j SPI 120

Pulp late 1.1 a3/min

Pump Efficiency 100 t Pomp Pressure 7500 kPa

Drillpipe AV 39 a/min Drillcollar AV 70 main Rorrle Veloc. 103 a/sec Mud Cycle 111 an Bottoms Up 55 tin Bud Tanks 62 a3 Bole Volume 60 a3

System Vol. 122 a3 FEUD ADDITIVES SURVEYS 1 Gel Caustic Soda Lignite

Peltex ime

Soda Ash "Stall° Barite

Acid Sawdust

SRI II Poly Plus

Mud Check?

Rud Daily Cost Mud Cut Cost

4 sx

4 pails

No $1,416 $39,062

2.4518E @ 1589 1.7518E @ 1617 2.0S67W @ 1645

'. phates k ud Co. l ud Engineer 1 udded Op @

SHAKER MAKE Payne i Harris (dual shakers) SHAKER MESH 2 @ 60 x 80 SOLIDS CONTROL

DESILTER

U.F. (kg/m3) Fisher De-Watering

of (1/sin) Operating .F. (kg/13) ours

CENTRIFUGE System

VOLUMES f . Wtr Hauled

j ..ses to Form, 7455 bbls

Nil

BOTTOMHOLE ASSEMBLY (No., Item, OD, ID, TJ Type) :it, I11, 2-String 4-EC, Jars, 12-00,

: Length wail RS is DP in Hole

11 stabs, short x-over sub,

174.84 a

DC, 2-String

Tapered Blade leaser

Hook Load Jts DP on lacks Jts DP on Location

1B stabs, 2-Morel

57,000

DC,

dal

(114xr, 4 1/211) 111

19,000 23 158

DRILLING OPERATIONS TI?IE BREAKDOWN WELL CONTROL Drill Tripping ,Rig Service Survey

,Nipple BOP Pressure Test Condition Hole Casing

Cetent

Casing Bowl

Rig Up/Tear Out slip/Cut WOC Drillout Ctt

22

1/4

1 3/4

Coring Logging AST

Circ Samples

Reax Rathole Randle Tools Rig Repair Reaming

Lost Circ Work Pipe Fishing

Wait on Orders

Total Ers 24

RSPP kPa/SPI ?lax Csg Press

CCalc Hole Fill Act Hole Fill Last BOP Drill: °Daylight Crew

;Afternoon Crew Graveyard Crew

3000 4 70 3633 kPa

92-02-14

92-02-12

SHOCK SUB (S/I, Rake, Days in Hole) - Mason Jars, 28 days

spud 1 Drl Out Shoe @

Back Drlq @

1st Log @ I

13:00 hrs 92-01-08 Surf TD @ Core Pt @ I'm @ Bit Stop Drlg @ Rig Release @

2.4 HOUR SUMMARY 00:00 hrs 92-02-14. Rotary drill with locked-up BRA from 1575 to 158011B ND to 01:15 hrs. Rig sere and function pipe rats to 01:30 hrs. Drill ahead from 1580 to 1599xKB MD to 05:15 hrs. Survey to 05:45 hrs. Drill ahead Prot 1599 to 16271KB ND to 11:00 hrs. Survey to 11:30 hrs. Drill ahead fro' 1627 to 16551KB ID to 19:00 hrs. Survey, survey bbl got stuck in DC's but managed to pull free, to 19:45 hrs. Drill ahead with locked-up NU from 1655 to 1670011 ID to 24:00 hrs 92-02-14.

Strap @ Board Tally JNeasurement [Made Corr.? .ILS 2/15/

22:00 bis 1677 n 1120 10.91 47

14 3

1.0/1.5

9.5

7.4 1 ma

trace

0.055 mil

0.15/0.3 39

400

trace

Pump No. 1

National 1P-10

140 x 203 120

Pulp No. 2 Deco D-700

140 z 406

1.1 ml/ein 100 1 6200 kPa 39 m/min 70 m,'min

2/sec

ll

1 1/2

' SOQU L.Y' CoR X L.L.3<. NG 12E1::)4ZoRT

WELT.: SOQUIP ST-FLAVIN IO. I

DEPTH: 1671 dB ND PROGRESS: 6 ■

OPER 4 OM00hrs: Cutting Core 110 a 16821KB (cut 7.25u)

DAILY COST: $20,817 BOLE COND.: Good

RA COST: $1,151,223 CONTRACTOR: latex 1

FORMATION: Dolomie C R.B. ELEV.: 143.55 ■

REPORT i:

in 11 1/4

BOREMAN:

WEATHER:

TEMP.: ROADS:

40 DATE: 92-02-16 rotating hours (last 24 hours) lilt Kraroat MOBILE 40.: (418) 721-3648 Blowing Sow TOOLPOSBER: Gerry Oaimet -10 C T.P. MOBILE: (411) 721-2631 Sew Bound MOBILE CRAWL: I/A

BIT PERFORMANCE DRILLING FLUID PUMPS dit Mo.

Sire (mo) 'Mfg. Type Serial 1 Mottles

From TO

firs on Bit WOB (dal)

RPM Condition Pulled For?

Meters mhr pin Hrs

Gel Caustic Soda

Lignite Peltex Lice

Soda Ash

Staflo Barite

Acid Sawdust SHA II Poly Plus

Mud Check? Mud Daily Cost Mud Cum Cost

9C 215

Heritage

RAP-445 (Dia)

a-31806

1672

1674.75 3.25

6000

75 Good

Jawed Off

2.75 0.8 61.50

2 sa

2 sa

4 pails

Yes $1,655 $40,717

10 C 215

leritage IDP-445 (Dia)

II /IOC

C9e1 1674.75 1678

7.00

6-8000 75

Coring

3.25

0.5 61.50

SURVEYS

Time Depth Density Mud Gradient

Vis PP

YP .Gels

pH Water Loss Filter Cake

Sand

Solids

Oil Pf if MBT

Cl Ca Sulphates Mud Co.

Mud Engineer Mudded Op 4

VOLUMES Cue Wtr Hauled Losses to Form.

BHA Length Avail WDB Jts DP in Hole

MUD ADDITIVES

MI Drlg Fluids

Tim 301 aIB

7605 Mils lit

lake Model Liner X Stroke SPM

Pulp Rate

Pulp Efficiency

Pump Pressure 'Drillpipe AV Drillcollar AV

Nozzle Veloc.

Mud Cycle Bottoms Op

Mud Tanks Hole Volume

System Vol. SHAKER MAKE SH.4K1_R MESH SOLIDS CONTROL

DESILTUP CEMTRTFUCE V.P. (kg/i3) Fisher De-0atering System

Vol (1Jmin1 Operating

O.P. (kg/a3( Moors

119 min

56 lin 69 23 62 m3

131 m3

Payne i Barris (dual Shakers) 24? 60 a 80

TYPA)

165.91 m Hook Load 58,000

19,000 Jts DP on Racks 22 159 Jts DP on Location

dal

(Um, 4 1/22) 181

BOTTOMHOLE ASSEMBLY (lo., Item, OD, ID, TJ

Core Bit 102mo I 215mi, Core Barrel 102un x 171mm I 181, 1-over sub, 12-DC's, Jars, 3-DC's, x-oser sob

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

1 1/2

13:00 brs 92-01-08

SHOCK SUB (SI, Make, Days in Hole( *MOD Jars, 29 days

Drill

Tripping Rig Service

Survey Nipple HOP

Pressure Test Condition Hole Casing

Cement

Casing Bowl Rig Cp'Tear Out

Slip Cut WOC trillant Cat

Coring Logging

DST Circ Samples Ream Rathole

Handle Tools Rig Repair Reaming

spud t Drl Out Shoe t Back Drlg t 1st Log

24

Surf ID t Core Pt t

FTD t Bit Stop Drlg K. Rig Release t

RSPP kPa'SPM Max Coq Press Calc Hole Fill

Act Hole Fill Last BOP Drill:

Daylight Crew Afternoon Crel Graveyard Crew

1500 P 78 3606 kPa

8.10 m3 3.30 tl

92-02-14

92-02-12

1/4 9 3/4

Lost Circ Work Pipe

Fishing Wait on Orders

Total His

24 HOUR SUMMARY 00:00 has 92-02-15. Rotary drill from 1670 to 167211E ID (Dolomie C core point picked ou depth) to 00:15 brs. Circ and

coud mad and bole to 00:45 brs. POOH and strap out, tight spot at 15401 B, work trough same with telly oa. POOR. Handle tools, lake op core barrels and /EH with same to 06:15 hrs. Circ, gum hole to make sore there are no bit inserts ,radar the core bit, and drop ball to 06:45 hrs. Cut Core 19: 1672 to 1674.75dB, Dolomie C, jammed off on connection to

10:45 hrs. POCK and recovered 2.7m of core, top of core had fractured rock which caused the *dog. Checked core bit, OK, serviced core barrels to 14:00 hrs. UN with core barrels to 16:30 hrs. Circ and drop ball to 17:00 brs. Cutting Core 110, Dol0mie C, from 1674.75 to 1678dB to 24:00 hrs 92-02-15.

1672 dB Board Tally 1672.00 ■ pMeasurenent 1672.45 m lade Corr.? 0.45m diff, Mo i SOQ8DR40.SLS 2, lb; 92 ENERCON EMCTM EREi I~C Ll~

Strap t

SOQSDR41.]LS 2:17;92 'Measurement Made Corr.'

EMERCOM ENGINNEERING LTD. Strap € Board Tally

WELL: S000IP ST-FLAYED 93. 1 REPORT t: 41 DATE: 92-02-17 DEPTH: 1617.25 .101 PROGRESS: 9.25 r in 19 rotating hours (last 24 hours) OP£R @ 0800hrs: Rotary Drilling 22211 Bole E 16961KB BD FOREMAN: Wilt' Krarchuk MOBILE BO.: (411) 728-3641 DAILY COST: $21,143 HOLE CORD.: Good WEATHER: Light Snow TOOLPOSHER: Gerry *diet CUM COST:" $1,172,366 CIIMTRACTOR: Baler 1 TEMP.: -1 C T.P. MOBILE: (411) 721-2631 FORMATION: Dolonie C M.B. ELEV.: 143.55 ■ ROADS: Snow Band MOBILE CHARNEL: 1/1 BIT PERFORMANCE !DRILLING FLUID PUMPS

Bit Ro. Sire Ism) Ifg. Type Serial 1 !Nozzles

From To ,Hrs on Bit WO6 (dal) RPM Condition Pulled For? leters n/hr Cup Hrs

10 C 215

Ieritage 1CP-44S (Dia)

CI-38806 Ope.

1674.75 1687.23

26.00 6-10000

75 tinged

Stop Coring 12.5 0.5

17.50

'Tine Depth Density Mud Gradient ,Vis , PV .YP Gels

'pH 'Water Loss 'Filter Cake Sand Solids Oil PUB MBT

Cl

Ca Sulphates Mud Co. Mud Engineer Mudded Up @

18:00 hrs 1616 1115 10.93

53

9.5 4.0 1 1.

II Drlg Fluids Rig Check

301 EBB

Pulp Mo. 1 Pu.p No. 2 a Matiooal Tosco

I .,-1 8P-80 D-700

finer X Stroke 140 z 203 140 r 406 4 P3 120

i' h Rate 1.1 .3/min

Efficiency 100 1

Pressure 6500 kPa u illpipe AV 39 1/vin 16 illcollar AV 70 ■;tin

orale Veloc. .jsec i ud Cycle 127 vin :.ttos Up 56 .in

1 . Tanks 71 n3 r.le Volume 62 .3 System Vol. 140 n3 MUD ADDITIVES SURVEYS

Gel Caustic Soda lignite Peltex Live Soda Ash Staflo Barite Acid Sawdust SHA II Poly Plus Bud Check? Mud Daily Cost Bud Cum Cost

30 sr

2 sr

4 pails to

$1,548 $42,265

'1:11131 MAKE Payne 6 Barris (dual shakers) :aRFR MESH 2 f 60 r 80 SOLIDS CONTROL

DESILTER .F (kg/13) Fisher De-Nateriag of (1/11in) Operating I.P. (kg/n3) wours

CENTRIFUGE System

VOLUMES Cu. Wtr Hauled !Lasses to Form.

7755 bbls Mil

130LE ASSEMBLY (No., item, OD, ID, TJ Type) OoTT

OMHOre Bit 1020

z-0ver sob, 12-DC's,

'BRA Length Avail ROB

.Jts DP in Bole

z 215111, Core Barrel Jars, 3-DC's,

165.91 a

102sa z 17111 z-over sub

Hook Load Jts DP on Racks Jts DP on Location

z 111,

51,000 daM (114®, 4 1'21E) 181

19,000 21 160

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Service Survey Nipple BOP Pressure Test Condition Hole Casing Cement Casing Bowl Rig Up:Tear Out SlipCut «OC Drillaut Ott

3 Coring Logging DST Circ Samples R.ea. Rathole Handle Tools Rig Repair Reaming

19

1 1/2

Lost Circ Work Pipe Fishing trait on Orders Recover Core

Total firs

1/2

24

RSPP kPa/SPM Max Csg Press Calc Hole Fill Act Hole Fill Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

1500 ! 78 3619 k?a 1.15 ..3 1.30 13

92-02-14

92-02-14 SHOCK SUB [S II, Rake, Days in Hotel lasao Jars, 30 days Spud € Dr1 Out Shoe € Back Drlg € 1st Log €

13:00 hrs 92-01-08 Surf TD € Core Pt € FTD € Bit Stop Brig € Rig Release €

24 HOUR SUMMARY 00:00 brs 92-02-16. Continue cutting Core j10 to 1687.2511® ND (Core 110, Dolouie C, 1674.75 to 1617.25, cut 12.51 in 26 brs) to 19:00 hrs. Flow check, bole static. POOH with core to 22:00 hrs. Recovered core and boxed same to 22:30

. Serviced core barrels and laid dove sale to 23:30 hrs. Picked up DST tools, break down and load out sale to 24:00 92-02-16.

DA„ I 3L.Y DR I L1.I NG REpQRT

SOQU T P i7ATIX DRTLL,TNG REPORT WELL: kiwi', ST-VLAVIEI ID. 1 REPORT 4: 42 DATE: 92-02-11 '

DEPTH: 1717 aKB ID PROGRESS: 30 m in 9 1.4 rotating hours (last 24 hours) OPER 4 0800hrs:loggimq With Atlas - Log Rim 1b. 2 FOREMAN: Nilf Iran** MOBILE NO.: (411) 724-3644

DAILY COST: $44,371 HOLE COND.: Good WEATHER: Clear/Nild TOOLPCSHER: Gerry 43aiaet

CUM COST: $1,216,737 CONTRACTOR: laies 1 TEMP.: +2 C T.P. MOBILE: (414) 724-2631

FORMATION: Dolomie C N.B. ELEV.: 143.55 a ROADS: Icy Sections MOBILE CHANNEL: I/A

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No. Size (mm)

Eq. Type Serial 1 Nozzles From To Hrs on Bit

WOB (daM)

RPM

Condition Pulled For? Meters stir Cum Firs

11 RR 222

Reed 1P-531--M 1-55404

3-4.7 1617 1717 9.25 11000

10 7-3-0 1/4

F7D 30

3.2 310.50

Time Depth density Bud Gradient Vis PV

YP 'Gels

`pH dater Loss Filter Cake

Sand

Solids Oil Pf 1f MBT

Cl Ca Sulphates Mud Co. Mud Engineer Mudded Up 4

17:15 hrs 1717 m

1125 11.03

42 35

12.5 5.0/1.0

9.5 7.2

2.0 mm

trace

0.072 ail

0.2/0.4 70

400

400 MI Drig Plaids

Tim 301 EMB

Pump No. 1 Pulp No. 2 Make Rational Kisco

Model 4P-40 D-700

Liner I Stroke 140 z 203 140 z 406 SPM 120

Pump Rate 1.1 113/air Pulp Efficiency 100 1 Pump Pressure 1000 kPa

Drillpipe AV 39 m/min Drillcollar AV 70 'loin Nozzle Veloc. 103 osec Mud Cycle 151 tin Bottoms Up 59 tin Mud Tanks 101 13 sole Volume 65 13

System Vol. 166 m3 MUD ADDITIVES SURVEYS Gel Caustic Soda

Lignite Peltex Lime

Soda Ash Staflo Barite

Acid

Sawdust SHA II

Poly Plus Mud Check? Mud Daily Cost Mud Cum Cost

77 sx 2 sr

2 sr 10 sr

2 pails Ies

$2,282 $44,547

2.3S67W 8 1707 SH_FER MARE Payne 6 Harris (dual shakers) SHARER MESH 2 4 60 z $0 SOLIDS CONTROL

DESILTER G.F. (kg;'m31 fisher De-Watering

Vol (Bain) Operatimg

O.F. ikg,m3) Hours

CENTRIFUGE System

VOLUMES Cum Witr Hauled Losses to Fort.

7905 bbls Nil

BOTTOMHOLE ASSEMBLY (No., Itea, OD, ID, TJ Type)

Bit, OR, 2-String 3-DC's, Jars, 12

BHA Length Avail 4708 Jts DP in Hole

Stabs, Short -DC's, z-over sub,

174.54 ■

DC, 2-String Stabs,

Tapered Blade

Hook Load

Jts DP on Racks Its DP on Location

2-Nomel DC's,

Reamer

51,000 dal(

(1141, 4 1/210) 181

19,000 1$ 163

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping Rig Service Survey

Nipple BOP Pressure Test Condition Bole Casing

Cement

Casing Bowl

Rig Cp Tear Out Slip Cut

WOC Drillout Cut

9 1/4 7

1/2

2 1/2

Coring Logging

DST Circ Samples Ream Rathole

Handle Tools Rig Repair Reaming

1 1/4

1 1/4

2 1/4

Lost Circ Work Pipe Fishing

Wait on Orders

Total Hrs 24

RSPP kPa;SPM Max Csq Press Calc Hole Fill

Act Hole Fill last BOP Drill: Daylight Crew

Afternoon Crew Graveyard Crew

1500 a 60 3603 kPa 4.20 m3

4.32 a3

92-02-17

92-02-14

SHOCK SUB (S N, Make, Days in Bolel Plasm Jars, 31 days

Spud € Drl Out Shoe €

Back Arlo € 1st Log €

13:00 hrs 92-01-48

00:05 tirs 92-02-14

Surf ID € Core Pt € FTD 4 Bit Stop erlg € Rig Release €

14:45 tirs 92-02-17

24 HOUR SUMMARY

00:00 tirs 92-02-17. Break down testing tools to 01:15 hrs. 110 with Bit 11121 to 03:15 hrs. leas cored rathole from

1672 to 1687118 to 05:30 hrs. Rotary drill ahead with locked-op BEA from 1687 to 1717mMB ID FM to 14:45 hrs.

ey to 15:15 hrs. Circ bottombole sample to 16:15 hrs. Dummy trip 10 stands to 17:30 hrs. Circ and coed mod and

le to 19:00 hrs. Flow check, hole static. P001, strap out and chain out for logging to 22:45 hrs. fig up Atlas Wireline

log to 24:00 tirs 92-02-17.

te: Driller's TO 1717mMB, Logger's TD 1715.9041KB, Sarf Csq Driller 300.48W B, Surf Csg Logger 300.51103.

Strap € 1717 1NB [Board Tally SOQ8DP42.i2 2.18 92

1716.95 ■ )Made Corr.? 0.051 diff, io EMFRCON ENGINEERIMG LTD.

1717.00 ■

Measurement

QC? 1,1

DA I I.Y DR I LL I NG RE PORT

WELL: SOQOIP ST-FLAVIEN ND. $ REPORT 1: 43 DATE: 92-02-19

DEPTH: 1717 mRB ID PROGRESS: ETD rotating hours (last 24 hours)

OPER P OIOOhrs: Logging With Atlas - Lag lue In. 5 MENAI: Wilt Ilravdiuk NOBILE NO.: (418) 72$-361$

DAILY COST: $45,865 BOLE COND.: Good WEATHER: lain Shovers TOOLPUSHEH: Gerry omimet

CUM COST: $1,262,602 CONTRACTOR: Islet L TEMP.: 0 C T.P. MOBILE: (41$) 72$-2631

FORMATION: Dolomie C R.B. ELEV.: 141.55 ■ ROADS: Slippery MOBILE CHANNEL: N/A

BIT PERFORMANCE ÿDRILLING FLUID PUMPS

Bit No.

Size (ma) Mtg. Type

Serial 1 Nozzles From To

Hrs on Bit 4IOB (dal) RPM Condition

Pulled For? Meters n/hr Cum firs 310.50

hive 03441)

Density

7lud Gradient

Vis

AT

I1

PGe1s p$ Water Loss

Filter Cake Sand Solids Oil Pf;Mf MAT

Cl Ca Sulphates

Mud Co. Mud Engineer Mudded Up @

IT Drig Fluids Tim

301 d B

Pump No. 1 Pulp No. 2 lake National Imo

Model $P-$0 D-700

Liner I Stroke 140 x 203 140 x 406 SPI

burp late m3/min .Pump Efficiency t Nap Pressure kPa ` prillpipe AV u/sin Tirillcollar AV ■/sin _Nozzle Veloc. m/sec Mud Cycle min ,Bottons Up min jlud Tanks m3 Hole Volume m3

System Vol. n3 MUD ADDITIVES SURVEYS Gel Caustic Soda

Lignite Peltes Line

Soda Ash Staflo Barite

Acid Sawdust SHA II

Poly P.us Mud Check? Mud Daily Cost Mud Cum Cost

lo $0

$44,547

SHAKER MAKE Pape i Harris (dual shakers) SHAKER MESS 2 $ 60 z 80 SOLIDS CONTROL

DESILTER V.F. (kg/13) Fisher De-Watering

Vol (1/min) Operating 41.F. (kg/a3) lours

CENTRIFUGE System

VOLUMES Cum Wtr Hauled Losses to Form.

8055 bbls Nil

BOTIOMHOLE ASSEMBLY (No., Item, OD, ID, TJ Type)

BHA Length

Avail WOB Jts DP in Hole

Hook Load Jts DP on Racks

Jts DP on Location

I

dal I (114m 4 1!2kH) , 181

181

DRILLING OPERATIONS TINE BREAKDOWN WELL CONTROL Drill Tripping Rig Service

Survey Nipple BOP

Pressure Test Condition Hole

Casing

Cement

Casing Bowl Rig Up Tear Out

Slip Cut WC Drillout Cat

Coring Logging

DST Circ Samples

Ream Rathole Handle Tools Rig Repair Reaming

24

Lost Circ

Work Pipe Fishing Wait on Orders

Total Hrs 24

Max Csg Press

.Calc Bole Fill Act Hole Fill Last BOP Drill:

Daylight Crew Afternoon Crew Graveyard Crew

RSPP kPa/SPW 3603 kPa

92-02-17

92-02-14

SHOCK SUB IS, N, Make, Days in Bole lama Jars, 31 days

Spud @ Drl Out Shoe € Back brig €

1st Log €

13:00 hrs 92-01-08 Surf TD € Core Pt € ETD € Bit Stop Drlg

Rig Release €

24 HOUR SUMMARY 00:00 tirs 92-02-1$. Logging with Atlas Wireline. Log Run 11: DIFL-AC-GI-IY Cai from 1715.9 to 300.5MB. Log Run

12: CI-IDL-SL-IT Cal from 1715.9 to 300.5mRB. Started Log tua Il, pulled out to add another caliper due to the directional nature of the hole. Log tun 13: CBIL-01 free 1715.9 to 11300KB to 24:00 hrs 92-02-18.

Strap € ]Board Tally ]Measurement Made Corr.? SOQSDR43.LLS 2:19;92

ON ENCINEEkIHC LTD.

U I

1a2Nk I L. 24G 12FI.?O1.291"

WELL: BOOM ST-FLAVI® N0. 8 REPORT 1: 44 DATE: 92-02-20

uEPIH: 1717 40 RD PROGRESS: FTD rotating hours (last 24 hours)

+PER @ O800hrs: Circ 1 Coed Nud i Bole for DST 13 FOREMAN: Wilf lürrmciluk MOBILE NO.: (411) 721-3641

n ILY COST: $17,239 BOLE 031D.: Good WEATHER: Blaring Soo, TOOLPIJSHER: Gerry Omiaet

61 COST: $1,279,141 CONTRACTOR: tales I TEND.: -7 C- T.P. MOBILE: (41$) 721-2631

FORMATION: Doloaie C K.B. ELEV.: 143.55 a ROADS: Mister Good. MOBILE CHANNEL: 1/1

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No. Site (o) Kfg.

Type

Serial 1 Mottles From To

Hrs on Bit i4De (daN)

RPN

Condition Pulled For? Meters

n rhr Cum firs 310.50

Tire Depth Density

Mud Gradient

Vis PV

'YP Gels pH hater Loss

Filter Cake Sand

Solids

Oil Pf/Nf MDT

Cl Ca Sulphates

Mud Co. Mud Engineer Mudded Up @

Ill Drlg Fluids

lig Cher* 301 01B

Pump No. 1 Pump No. 2

Make Idiom' two

ilodel 1P-10 D-700

Liner X Stroke 140 x 203 140 x 406

SPI

Pump late m3/min

Pump Efficiency % Pressure kPa

Drillpipe AV mimin Drillcollar AV isin

Morrie Veloc. n-sec Mud Cycle min Bottoms Op min

Mud Tanks el Hole Vol oe 13

System Vol. a3 MUD ADDITIVES SURVEYS Gel Caustic Soda lignite

Peltex Lime

Soda Ash

Staflo Barite

Acid

Sawdust SHA II

Poly Plus Mud Check?

Mud Daily Cost Mud Cum Cost

No $0

$44,547

SILM ER HAKE Payne i Barris (dual shakers) SHAKIR MESH 2 $ 60 x 80 SOLIDS CONTROL

DESILTER C.F. (kg/m3) Fisher De-Watering

Vol (l;ain) Operating O.F. ikg/a3) Hours

CENTRIFUGE System

VOLUI4ES Cum Wtr Hauled Losses to Form.

8205 lrbls Ill

BOTTONHOLE ASSEMBLY iMo., Iten, OD, ID, TJ Type)

BHA Length Avail WOB Jts DP in Hole

Hook Load Jts DP on Racks Jts DP on Location

daN (114na, 4 1/22) I11

Ill

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill

Tripping Pig Service

Survey Nipple BOP Pressure Test

Condition Hole Casing

Cement

Casing Bowl Rig Cp/lear Out S1ip,Cut WGC Drillout Cot

1 1/4

Coring

Logging DST Circ Samples Ream Rathole

Handle Iools

Rig Repair Reaming

20

Lost Circ Work Pipe

Fishing wait on Orders Pull Wear Ring wait on RFT

Intervals (IG Total Hrs

1 1/4

1 1/2 24

RSPP kPa/SPI( Max Csg Press Calc Hole Fill

Act Hole Fill last BOP Drill:

Daylight Crew

Afternoon Crew Graveyard Crew

3603 kPa

92-02-17

92-02-14

SHOCK SUB IS N, Make, Days in Hole) Mason Jars, 31 days

Spud @

Dri Out Shoe @ Back Dulg @ 1st Log @

13:00 hrs 92-01-08 Surf TD @ Core Pt @ ETD @

Bit Stop trig @ Pig Release @

24 HOUR SUMMARY :00 Mrs 92-02-19. Logging with Atlas Wireline. Log Bun 14: I1LL-01 from 1711.8 to l050d01, Log gum 15: Dipmeter

rom TD to ll20m1B, to 10:30 hrs. Wait on orders for PM intervals. While îi00, retrieved wear bushing and ras test lug into the surface casing bowl. Pressure tested blind rams, pipe rams and hydril to 1400 kPa low and 7000 kPa high for

10 min. each, held OK, to 13:00 hrs. Rigged up Atlas Wireline to 13:30 hrs. Waited an RFT interval program to 15:00 hrs.

Log 16: Formation Multi-Tester (El) from 1680 to 1079.5m8B to 24:00 bra 92-02-19.

Strap ~ SOODR44.IIS 2:2092

Board rally pleasurenent ade Corr.?

ENERCON ENGINEERING LID.

S4DQUSV I.?A 1:. l',X I3R :L LL 1: NG R EPC]RT

W111.L: SOODIP ST-FLIVI1N B3. 8 REPORT 1: 45 DATE: 92-02-21

DEPTH: 1717 dB ID PROGRESS: FTD rotating hours (last 24 hours)

OPER @ 0800hrs: 111 with HST 14 FOREMAN: Will Krawdtlk MOBILE ND.: (411) 728-3648 DAILY COST: $19,209 BOLE COND.: Good WEATHER: Clear T00LPUSHER: Gerry Omiaet

CUM COST: $1,299,050 CONTRACTOR: Bales 1 TEMP.: -5 C T.P. MOBILE: (4111 725-2631

FORMATION: Iblomie C K.B. ELEV.: 141.55 ■ ROADS: Fair MOBILE CHANNEL: I/A

BIT PERFORMANCE 'DRILLING FLUID 'PUMPS Bit lio.

Size Ism)

Nfg. Type Serial 1 Nozzles

From

To Mrs on Bit

'BOB (daN) 104 Condition ,Pulled For? Meters

n/hr Gun Hrs 310.50

Tine Depth Density Mud Gradient

Vis PV VP

Gels pH Water Loss

Filter Cake Sand Solids Oil

Pf;Mf MBT

Cl Ca Sulphates

Mud Co.

Mud Engineer 'Mudded Up C

08:30 tics

1110

10.8

9.5 7.2

2 vs

NI Drlg Fluids Rig Check 301 mNB

Pulp No. 1 Puap No. 2 Make lationel Bosco Model SP-10 D-700 Liner X Stroke 140 1203 140 x 406 SRN 120

Pump Rate 1.1 13/tin Pump Efficiency 100 t Pump Pressure 8000 M'a Drillpipe AV 39 m/min Drillcollar AV 70 this Nozzle Veloc. 101 mrsec Mud Cycle 139 sin Bottoms Up 70 min )Mud Tanks 76 e3 Mole Volume 77 13

System Vol. 153 n3 MILD ADDITIVES SURVEYS Gel Caustic Soda

Lignite

Peltex Line

Soda Ash Staflo Barite

Acid Sawdust SEA II Poly Plus Mud Check? Mud Daily Cost Mud Cum Cost

2 sx

No

$46 $44,593 Jts DP in Hole

SHAKER MAKE Payne i Harris (dual shakers) SHAKER MESH 2 f 60 x 80

SOLIDS CONTROL DESILTER

D.E. (kg/a31 Fisher De-Watering

Vol (1/min) Repairing Pump O.F. (kg/n3) Hours

CENTRIFUGE System

VOLUMES Cum Wtr Hauled Losses to Fors.

8355 bbls Nil

BOTTOMHOLE ASSEMBLY 1No., Item, OD, ID, II Type) Baker test tools

B11 Length Avail WOB

(see Baker test sheet)

Hook Load Its DP on Racks Its DP on Location

daN

(1141s, 4 1/2111 181

141

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Service Survey Nipple BOP

Pressure Test

Condition Hole Casing

Cement

Casing Bowl

Pia Uplear Out Slip Cut

WC( Xrrillout Cat

8 1/4

1 1/2

1/2

Coring

Logging DST Circ Samples Ream Rathole

Handle Tools

Rig Repair Reaming

4 7

2 3/4

Lost Circ

Work Pipe Fishing Wait on Orders

Total Rrs 24

RSPP kPa/SPN Max Csg Press

Calc Hole Fill Act Bole Fill Last BOP Drill: Daylight Crew

Afternoon Crew Graveyard Crew

1603 kPa 8.20 >3

8.38 i3

92-02-17

92-02-20

SHOCK SUB )511, Make, Days in Hole) Spud C Drl Out Shoe @ Back Drlg C 1st Log €

13:00 brs 92-01-08 Surf TD C Core Pt C rID @

Bit Stop Drig O Rig Release C

24 HOUR SUMMARY 00:00 hrs 92-02-20. Finish logging with Atlas Wireline on Formation Nulti-Tester from 1079.5 to 769.91KB. Tear out loggers to 04:00 hrs. III with bit for clean-out trip, break circ 20 stands into the hole, to 07:00 ins. Ciro and coed mud and bole to 08:30 hrs. POOH for DST 13 to 11:15 hrs. Laid down stabilization and short DC's to 12:30 tits. Slip and cut drilling line to 13:00 hrs. Pick up and make up AST 13 with Baker Oil Tools to 14:30 hrs. Strap and BID with DST 13 to 17:00 hrs. Head up and ran DST 13, Dolamie C, 1669 to 1717MEB, conventional bottamhole test, 10-60-90-225, I Ti S, to

24:00 hrs 92-02-20.

Mote: Load out directional tools, jars, shock sub, core barrel and misc. tools via Tri Line trucking to Kdmootce, Alberta.

Strap O Board Tally Measurement Made Corr.? J SOQ8DR45.?:LS 2.21'92

ENERCON ENGINEERING LTD.

DAILY E4 Ft. LUNG REPORT

WELL: SOCCIP ST-FLAVIIN 10. 8 REPORT 4: 46 DATE: 92-02-22 DEPTTI: 1717 mom 40 PROGRESS: PTD rotating hours (last 24 hours) OVER @ 0800hrs: Piml Shut Is on DST 15 FORMAN; Nil( rrawchok MOBILE KO.: (418) 721-3648 DAILY COST: $31,652 BOLE COND.: Good WEATHER: Clear TOOLPOSHER: Gerry Olivet CIA COST: $1,330,702 CONTRACTOR: Hales 1 TEMP.: -I C T.P. MOBILE: (411) 728-2631 FORMATION: 1blanie C R.B. ELEV.: 143.55 N ROADS: Fair MOBILE CHANNEL: I/A

BIT PERFORMANCE DRILLING FLUID PUMPS Bit No. Site Imo) tfq. Type Serial ! Mohler From To Irs on Bit 1DB (dal)

RPM Condition Pulled For? Meters stir Cum lirs 310.50

Tine Depth Tensity Mud Gradient Vis PV 1P Gels pB dater Loss Filter Cake Sand Solids dil Pf ,1if MBT Cl Ca Sulphates Mud Co. Mud Engineer Mudded Up f

08:30 hrs

1110 10.8 56

9.5 7.2

2 mm

RI Drlg Fluids Rig Check

301 ml®

Pump No. 1 Pump Ko. 2

Make National Rsco Model SP-80 D-700 'Liner I Stroke 140 r 203 140 s 406 SPI

Pump late s3/min Pump Efficiency t Pulp Pressure kPa Drillpipe AV n/ain trillcollar AV m/min -Nozzle Veloc. II /sec Mud Cycle ain Bottoms Op min Mud Tanks 13 Hole Volume 113 System Vol. 13 MUD ADDITIVES SURVEYS

Cel Caustic Soda Lignite Peltex Lime Soda Ash Staflo Barite Acid Sawdust SHA II Poly Plus Mud Check? Mud Daily Cost Mud Cu. Cost

No $0

$44,593

SHAKER WAKE Payne 1 Barris (dual shakers) SHAKER MESH 2 N 60 s 80 SOLIDS CONTROL

DESILTER C.F. (061 Fisher De-Watering Vol (1/mini Repairing Pump 0.1. (kgrn3) Hours

CENTRIFUGE System

VOLUMES Cum Wtr Hauled Losses to Fors.

8505 bbls Nil

BOTTOMHOLE ASSEMBLY (Po., Iten, OD, ID, TJ Type) Baker test tools

BHA Length Avail WDB Jts DP in Hole

(see Baker test sheet)

Hook Load Jts DP on Racks Jts DP on Location

daM (114an, 4 1;2381 181

181

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill Tripping Rig Service Surrey Nipple BOP Pressure Test Condition Hole Casing 'Cenent Casing Bowl Pig Cp Tear Out Slip Cut

iiOC

Drillout Cut

8 1/2 Coring Logging DST Circ Saaples Ream Rathole Handle Tools Rig Repair Rearing

9 1/2

6

Lost Cite Work Pipe Fishing wait on Orders

Total Bra 24

RSPP kPa/SPM Max Csg Press Cale Hole Fill Act Hole Fill Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

3633 kPa 8.52 n3 8.60 a3

92-02-17

92-02-20 SHOCK SUB (S 8, Make, Days in Hole Spud € Drl Out Shoe € Back Drlg € 1st Log €

13:00 hrs 92-01-08 Surf TD f Core Pt is

!FTC

Bit Stop Drlg C. Rig_ Release €

24 HOUR SUMMARY 00:00 hrs 92-02-21. Pulled free with 16T 13. POOR, take flow checks, bole static, to 03:00 hrs. Recovered recorders and make up DST #4 to 07:00 hrs. III with DST 14 to 09:30 hrs. Bead sp and rum Dv 14, 1470 to 14904 B, Beekrantown, Icoeventioaal straddle, 5-70-120-360, GTS. lad to dig out test riser on flare lice because it was buried under a 4' snow drift. Rua DST 14 to 19:00 hrs. Pulled free with 12,000 dal over string weight. POOR, take flow checks, hole static, to 22:00 hrs. Recovered recorders and read same to 24:00 hr's 92-02-21.

Strap € Board Tally 'Measurement 'Made Corr.? 8DR45.XLS 2 2 92

CON EII INHERING LTD.

SOQU I P DA I I.Y DRTLLTNG REPORT

WELL: 9DQIIIP ST-1LAVIEN 1D. 4 REPORT 1: 17 DATE: 92-02-23

DEPTH: 1717 'KB 0) PROGRESS: RID rotating hours (last 24 hours)

OPER @ 0/00hrs:P:C after Plug No. 1 FOREMAN: lilt Mrarchuk MOBILE NO.: (418) 721-3648

DAILY COST: $30,147 HOLE COND.: Plugged Back :FATHER: Overcast TOOLPUSHER: Gerry Mink

CLTI COST: $1,360,149 CONTRACTOR: Latex 1 TEMP.: -4 C T.P. MOBILE: (411) 728-2631 FORMATION: M.B. ELEV.: 143.55 a ROADS: Fair MOBILE CHANNEL: 1/k BIT PERFORMANCE DRILLING FLUID PUMPS Bit No.

Size Ism) Mfg. Type Serial 1 Nozzles

Fros

To Hrs on Bit

WM (dal) RPM condition Pulled For?

Meters n hr Cum Hrs 310.50

Title

-Depth Density

Mud Gradient Vis PV

'YP `Gels pH

dater Loss Filter Cake Sand Solids

Oil Pf/TIf iIBT

Cl

Ca Sulphates

Mud Co. Mud Engineer Mudded Up @

21:00 his

1120 10.98

48/88 17

4 1.0/2.5 9.0

' 1.0 .

2 a

trace 0.072 ail

0.1/0.3 41

350

500 II Ilrlg Fluids

Tim 301 aBB

Pump No. 1 Pump No. 2

Make latiomal ThOa 31odel SP-40 D-700 Liner 1 Stroke 140 x 2003 140 t 406 SPK

Pump Rate Wain Pump Efficiency I 'Pup Pressure kPa Drillpipe AV a/min Drilicollar AV slain Motile Veloc. ■/sec )lud Cycle min Bottoms Up ain Mud Tanks m3 Bole Volume a3

'System Vol. a3 MUD ADDITIVES SURVEYS Gel Caustic Soda

Lignite Peltex Lise

Bicarb Staflo Barite

Acid Sawdust

SHA II Poly Plus

Mud Check? Mud Daily Cost Mud Cut Cost

10 sI

4 so

1 pail

2 pails

Yes $137

$45,430

SHAKER MAKE Payne i Marris (dual shakers) SHAKER MESH 2 P 60 x W SOLIDS CONTROL

DESILTER L.F. (kg/13) Fisher De-iaterimg

Vol (1/min) Processing 0.F. (kg/m3) Hours

CENTRIFUGE System

VOLUIME.S

Cum Wtr Hauled Losses to Fors.

8655 bbls lit

BOTTOMHOLE ASSEMBLY (No., Item, OD, ID, TJ Type)

BHA Length Avail WO Jts DP in Hole

Hook Load Jts DP on Racks Its DP on Location

de/ (114wa, 4 1/218) Ill

111

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL Drill

Tripping Rig Service

Survey Nipple BOP

Pressure Test

Condition Hole Casing

Cement

Casing Bowl Rig Cp'Tear Out Slip-Cut

WOC CDrillout Cat

1 1/2

3 1/2

Coring

Logging DST

Circ Saaples Ream lathole Handle Tools Rig Repair Reaming

7 1/4

4 3/4

Lost Circ

Work Pipe fishing riait on Orders

Total Hrs 24

RSPP kPa/SPM Max Csg Press

talc Hole Fill

Act Hole Fill Last BOP Drill: Daylight Crew

Afternoon Crew Graveyard Crew

3633 kPa 8.56 13

8.60 a3

92-02-22 92-02-20

SHOCK SUB 611, Make, Days in Hole)

Spud €

prl Out Shoe t Back Drlq I 1st Log f'

13:00 brs 92-01.08 Surf TD F Core Pt FTD I Bit Stop Drlg h Rig Release

24 HOUR SUMMARY 40:00 hrs 92-02-22. take up DST T1ST #5, 1430 to l470mNB, Bee:mantarm,

dal over string ut, PO31, to 12:45 io 16:15 hrs. III apes-ended DP, pigb vis Nerd pill to 21:00 hrs. Ice sent plag) and displace same

external air compressor to feed cemeaters and held safety meeting

t5 with Baker comveational

hrs. Recovered strap ia, to

PC01, strap out to 21:30 hrs. balk cement because

oil Tools to 01:15 hrs. ill with DST 15 to 02:30 hrs. lead Iv and rua

straddle, 5-60-90-240, OS to 09:45 hrs. Pull loose with 12000 recorders and transmitted data. Break dui tools and load oat tester

19:00 hrs. Pick mp 20 singles, tagged bottom, to 20:15 hrs. Ciro and iii to 15501106 to 21:15 hrs. Pump high viscosity mud pill (to act as barrier to

Pulled op to 15054103. Ciro and Tait on eemeaters to rig up (had to rig op compressor om balker had broken dolls). Finish rigging up

92-02-22. to 24:00 hrs

Strap @ 'Board Tally 'Measurement 1Made Corr.? SOO8DR4'.S1S 2 23 12

EMERCON ENGINEERING LTD.

Board Tally —1fieasure.ent Strap @ SOQ8DR48.XLS 2,'24 92

Made Corr.? DIXON ENGINEERING LTD.

1~AT L.Y 17,12 /410 121E1=0C4RT WELL: 90001P ST-PLAVIII L. 8 REPORT f: u DATE: 92-02-24 DEPTH: 1717 dB ID PROGRESS: 1490 .1B PBTD rotating hours (last 24 hours) OPER @ 0800hrs: Circulate Casing F I490mIB MD FOREMAN: Nilf rrardfuk MOBILE NO.: (418) 721-3648 ,DAILY COST: $23,360 BOLE 001W.: Cased WEATHER: Clear TOOLPCSRER: Gerry 0timet Cti COST: $1,314,209 CONTRACTOR: Raie: 1 TEMP.: -18 C T.P. MOBILE: (418) 728-2631 FORMATION: PBlO R.B. ELEV.: 143.55 m ROADS: lair MOBILE CHANNEL: i/i

BIT PERFORMANCE DRILLING FLUID PUMPS Bit No. Size Ira)

'Mfg. Type Serial 1 Nozzles Fro.

to Hrs on Bit i4IB (dal() RPM

Condition Pulled For? Meters

n;hr Cun Hrs 310.50

Tire

'Depth Density

Mud Gradient Vis

PV

YP Gels p0 'Water loss Filter Cake Sand

13:30 hrs

1490 In 1120 10.98

41

9.0

8.0 2 in

Pulp No. 1 Pump No. 2 Make National Vasco Model 8P-80 D-700 Liner 1 Stroke 140 z 203 140 z 406 SPX

Pump Rate t3/min ,Pump Efficiency t Pump Pressure kPa Drillpipe AY tui.n Drillcollar AV "'tin Nozzle Veloc. m sec

Solids

Oil

PI/Nf NBT

Cl

Mud Cycle tls Potters Op tin Mud Tanks .3 Hole Volume 13

System Vol. p3 MUD ADDITIVES SURVEYS Gel Caustic Soda

Lignite Peltex Lime

Bicarb Staflo Barite

Acid Sawdust

pa II Poly Plus

Mud Check? Mud Daily Cost Mud Cum Cost

6 sr

15 sz

2 pails

3 pails

No $500

$45,930

Ca

Sulphates SHAKER MAKE Payne & Harris (dual shakers) SHAKER MESH 2 k 60 z 10

Mud Co.

Mud Engineer Mudded Up @

II Drlg Fluids fig Check 301 :1B

SOLIDS CONTROL DESILTER CENIRIFOGE

C.F. (kgia3) Fisher He-Watering System

VOLUMES Vol (1/min) Processing Cup Wtr Hauled Losses to Form.

$805 bbls Nil

O.F. (kg/m31 ,Hours

BOTTOMHOLE ASSEMBLY INC., Item, OD, I), TO Type) Drill String laid dons.

BHA Length Hook Load dal( Avail NOB Jts DP on Racks 181 (114nn, 4 1 21E) Jts DP in Bole Jts DP on Location 181

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL ,Drill Tripping

Rig Service Sure}• Nipple BOP Pressure Test

Condition Hole Casing

Cement

Casing Bowl

Rig Cp Tear Out Slip Cut

iOC Drillout Cat

1 1/2 1

3/4

11

Coring

Logging DST Circ Samples Rea. Rathole

Handle Tools Rig Repair Reaping

Lost Circ work Pipe Fishing

wait on Orders LOW Polish Plug

Total Hrs

8 1/4 1 1/2

24

RSPP kPa/SPN Max Cog Press

Calc Bole Fill Act Hole Fill Last. BOP Drill: Daylight Crew

Graveyard Crew Afternoon Crew

3633 kPa 7.60 13 7.65 a3

92-02-22

92-02-20 !SHOCK SUB )S 1, Make, Days in Hole)

Spud @

Dr1 Out Shrw, @ Back Drlg @ 1st Log @

13:00 hrs 92-01-08 Surf TD @ Core Pt @ FTD t Bit Stop Drlg @ Rig Release @

24 HOUR SUMMARY OD:00 hrs 92-02-23. pigged up Basco and cement Plug lo. 1: 1505 to 14154B (casing landing plug to isolate bottom zones for casing cement job) with 2.0 tonnes 0-1-0 Class G + 0.51 T-10 to 00:45 hrs. Left hole open from 1505 to 171716. POE dry with open-ended DP. 140C to 11:45 hrs. 111 with bit, strapped in and tagged cement at 1472mRB. Polished plug down to 1490tiB, drilling intermittently at 3.5 to 5 .it/m (good solid Dement plug) to 13:15 hrs. Circ and

I

coed mud and hole, treat out contaminated mud, to 14:45 hrs. POO, lay dorm drill string, kelly and swivel to 23:00 hrs. Rig up Rig Service power tongs to run 177.8 am production casing, held safety meeting with rig crew, to 24:00 hrs 92-02-24.

I7AS 1 .V 1,1-Z It I2E1C)12T

WELL: SOQOIP ST-YLAY1® 10. 8 REPORT I: 49 DATE: 92-02-25

DEPTH: 1717 mKB RD PROGRESS: 1490 mNB PBTO rotating hours (last 24 hours)

OPER @ OHOOhrs: Pig Released @ 08:00 hrs 92-02-25 FOREMAN: Wilf Granola* NOBILE MO.: (411) 721-3641

DAILY COST: $109,051 HOLE COMD.: Cased FEATHER: Clear T'OOIPOSHEP: Gerry Oai'et

CUN COST: $1,493,260 CONTRACTOR: latex 1 TEMP.: -8 C T.P. MOBILE: (411) 721-2631

FORMATION: PM) K.B. ELEV.: 143.55 ■ MAX: Fair MOBILE CHANNEL: l/R

BIT PERFORMANCE DRILLING FLUID PUMPS

`Hit No. 1Size l's) Mfg. Type

Serial 1 14ozzles

Fro' )7o

\Ors on Bit WDB (dal) RPM

condition Pulled For? Meters n'hr Cum Hrs 310.50

Tile Depth Density llud Gradient 'is

M' IT Gels

pH Water Loss Filter Cake

Sand

10:15 hrs 1490 m 1115 10.93

40

20.5 3.5

1.0/2.5

9.5 9.4 2 or trace

Pump No. 1 Pump No. 2

Make National !mod Model HP-80 D-700

Liner 1 Stroke 140 x 203 140 r 406

APM

Pump Rate '3/'in

Pump Efficiency 1 Pump Pressure kPa

Drillpipe AV '/'in Drillcollar AV '/'in Nozzle Veloc. '/sec

Solids Oil

Pf; Nf MBE

Cl__

0.073 nil

0.2/0.5 42 kiole

350

Mud Cycle min

Bottoms Op tin

Ôlud Tanks 13 Volume 13

System Vol. n3 MUD ADDITIVES SURVEYS 11 1Ca Sulphates

10

800

SHAKER MAKE Payne I Barris ((ial shakers)

SHAKER MESH 2 @ 60 r 80 Gel Caustic Soda

Lignite Peltex Lime

Bicarb

Staflo Barite

Acid

Spersene

SHA II Poly Plus Mud Check? Mud Daily Cost Mud Cum Cost

10 sx

15 sr

Tes

$1,028 $46,951

Mud Co. Nud Engineer Mudded Op @

BT IXlq Fluids Ti.

301 mKB

SOLIDS CONTROL DFSILTER CENTRIFUGE

l.F. (kg/n31 Fisher De-Watering System

VOLUMES Vol (limin) Processing

Cum Wtr Hauled Losses to Fora.

9285 Ibis Mil

O.F. (kg/n3) Hours

BOTTOMHOLE ASSEMBLY (No., Iten, CO, ID, TJ Type)

BHA Length Hook Load dal

Avail WOB Jts DP on Racks 181 (114nm, 4 1;22)

Jts DP in Hole Its DP on Location 181

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping Rig Service

Survey

Nipple BOP Pressure Test Condition Hole Casing

3 3/4 7 1/2

Coring Logging DST

Circ Samples Rea' Ratbole Handle Tools

Rig Repair Reaming

Lost Circ Work Pipe Fishing Wait on Orders

Safety Meeting

Total Hrs

3/4

24

RSPP kPa/SPN Max Csg Press

Calc Hole Fill Act Hole Fill

last BOP Drill:

Daylight Crew Afternoon Crew Graveyard Crew

92-02-22

92-02-20

Cement 2 3/4 SHOCK SUB IS M, Make, Days in Hole)

Casing Bowl

Rio Cp Tear Out

Slip Cut 49C

Drillout Cot

9 1/4

Spud @ Drl Out Shoe @

Back Dr144 @

1st Log @

13:00 brs 92-01-08 Surf TD @ Core Pt @

FID @

Bit Stop Drlg t Rig Release @ j

24 HOUR SUMMARY

00:00 brs 92-02-24. lake up float shoe/collar and ran 115 jts of 177.1mm, 38.69 kg/a, l-80, LT I C, lange 3, Tpsco

img c/w centralizers. Break cire and work tight spots, casing sticky, palled 80,000 dal to woes free, to 07:30 Tars. Circ

Coed mud and hole, reduce VP, to 11:15 brs. Held safety meeting with crew and rig up lwsco. Cemented with 13 113

reflush, 23.6 tonnes 0-1-2 Class G filler cement and 16.2 tonnes 0-1-2 Class G + 18t lad) + 0.51 T-10 + 0.5% D-24

it-in cement. Displaced with fresh rater, plug down at 14:37 Tars, floats held, had 4.8 13 good cement returns, to 14:45

. Dash cement out of HOP's and set slips with 43,000 dal (fall tension). Tear out BOP's, manifold lines, etc. Continue

to de-water mud which was displaced by the cementing to 24:00 Tars 92-02-24.

Strap t 'Board Tally )Measurement (Made Corr.? ..r...

SOQ81:R49.xLS 2:'25

>'C?LJZP I1I21: N 12EPOI2T

WELL: SOQUIP ST-FIAYIRN 10.8 REPORT f: 50 DATE: 92-02-26

DEPTH: 1717 ERB ID PROGRESS: 1490 m4B PBTD rotating hours 'last 24 hours) OPER @ 080Ohrs: Rig Released P 08:00 firs 92-02-25 FOREMAN: Will Rrawchuk MOBILE MO.: (41M) 728-3648

DAILY OOST: $31,740 HOLE COND.: Cased WEATHER: Blowing Soon TOOLR:SEER: Gerry Ouimet

CUM COST: $1,525,000 CONTRACTOR: kale' 1 TEMP.: -8 C T.P. MOBILE: (418) 728-2631

FORMATION: PBTD K.B. ELEV.: 143.55 n ROADS: Icy Sections MOBILE CHAMMEL: 11/1

BIT PERFORMANCE DRILLING FLUID PUMPS

Bit No.

Site Inn) Mfg.

Type

Serial !

Mottles From To firs on Bit WDB (daN) RPM

Condition Pulled For? Meters a,hr Cue Hrs 310.50

Tile 0- pth

a•nsity

Mud Gradient Vis

P1

YP is

PE .ter Loss Filter Cake Sand

Pulp No. 1 Pump No. 2 lake national Cisco

ode) 8P-10 D-700

Liner I Stroke 140 z 203 140 z 406

PM

Puip Rate n3 min

Pump Efficiency I

Pump Pressure kPa

a illpipe AV m,min n illcollar AV tlmin

rottle Veloc. o,sec

Solids

oil PfiNf uT 1

Bud Cycle tin Bottoms up min Mud Tanks a3 :ole lolume a3 Syste' lol. n3 MUD ADDITIVES SURVEYS

• Sulphates

SHAKER MANE Payne i Barris (dual shakers) SHAKER BISE 2 4 60 z 80

Gel

.ustic Soda

Lignite Peltex Line

:icarb Staflo :.rite

Acid

Spersene SHA II Poly Plus ' ud Check?

(Mud Daily Cost Bud Cum Cost

17 pails

18 pails

No

$2,000

$48,958

Mud Co. Mud Engineer udded Up @

NI Drlg Fluids

301 oKB

SOLIDS CONTROL DESILTER CENTRIFUGE

E.F. Ikg,m3l Fisher Deüatering Systee

VOLUMES Vol (lain) Processing Cum Wtr Hauled Losses to Form.

4605 bbls Nil

6.F. Ikg.m3) ':ours

BOTTOMHOLE ASSEMBLY (No., net, OD, ID, fJ Type)

BHA Length Book Load dal .Avail WOB Jts DP on Racks 111 11141m, 4 1 21111

1Jts DP in Hole Jts DP on Location 121

DRILLING OPERATIONS TIME BREAKDOWN WELL CONTROL

Drill Tripping Rig Service Survey Nipple BOP Pressure Test

Condition Hole Casing

kement

Coring Logging DST Ciro Samples

Rea' Rathole

Handle Tools Rig Repair Reaming

Lost Circ

Work Pipe Fishing Wait on Orders

Total His d

RSPP kPa,SPR an Csg Press

Cale Hole fill Act Role Fill Last BOP Drill: Daylight Crew Afternoon Crew Graveyard Crew

SHOCK SUB 'SII, Make, Days in Hole;

Casing Bowl Fig Up Tear Ou Slip Cut

OC

Drillout Cut L

Spud @ 8 IDri Out Shoe €

Back Drla 1st Lock

13:00 hrs 92-01-0$ Surf ID € i Core Pt

FTD E

Bit Stop Drlg f1 Rio Release € 08:00 hrs 92-02-25

'24 HOUR SUMMARY O60:00 hrs 92-02-25. Tear out BOP's and flare lines. Installed protection plate on casing bowl and welded cap as casing.

Fisher Fluids Processing continued to de-water mud displaced frog hole to 02:00 hrs. Rig could mot be released as per ;contract because mud tanks were still full of drilling fluid waiting to be processed. Rig Released at 08:00 hrs 92-02-25.

,Mote: Fisher continued de-watering anti) 22:00 hrs. Will ship out all Fisher equipment and miscellaneoes its 92-02-26.

Bare contacted Tri-Lice Tracking re. baCkhaal for leftover 178tm production casing.

FOAL R[POYT

Strap @ !Board Tall. IMeasureoent SOQEDR49.XIS 2 26 92

Made Corr

ENERCON ENGIMEE273C LTD.

SOQUIP ST-FLAVIEN NO 8

DESCRIPTION DÉTAILLÉE

DES RETAILLES

SOQUIP ST-FLAVIEN NQ 8 DESCRIPTION LITHOLOGIQUE

0-5 mkb:

5-10 mkb: 20 %

30 %

50 %

10-15 mkb: 90 %

10 %

15-20 mkb: 90 %

10 %

20-25 mkb: 70%

pas d'échantillon

sable grossier à très grossier, anguleux, 70 % quartz transparent à laiteux, parfois oxydé, 30 % fragments litiques. grès verdâtre, grains fins à moyens, sub-arrondis à arrondis,mal triés, chloriteux, parfois glauconitique, faiblement calcaireux, typique des bancs de grès de la Klippe de la Chaudière---ex; près du pont de Québec. shale verdâtre à gris moyen, parfois silteux, parfois gréseux, (grains flottent dans la pâte), calcaireux.

sable grossier à très grossier, anguleux, 70 % quartz transparent à laiteux, parfois oxydé, 30 % fragments litiques. shale gris foncé, peu ou pas calcaireux, aspect lustré

sable grossier à très grossier, anguleux, 70 % quartz transparent à laiteux, parfois oxydé, 30 % fragments litiques. shale gris foncé, peu ou pas calcaireux, aspect lustré

shale gris foncé à noir, aspect lustré, strié à l'occasion, très pyriteux, faiblement calcaireux.

30 % grès verdâtre, grains fins à moyens, sub-arrondis à arrondis,mal triés, chloriteux, parfois glauconitique, faiblement calcaireux.

TR calcite de fractures, blanc

25-30 mkb: 70 % shale gris foncé à noir, aspect lustré, strié à l'occasion, très pyriteux, faiblement calcaireux.

30 % grès verdâtre, grains fins à moyens, sub-arrondis à arrondis,mal triés, chloriteux, parfois glauconitique, faiblement calcaireux

1

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

30-35 mkb: 95 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pjrriteux,parfois avec des inclusions de grains de quartz fins, environ 60 % de couleur gris foncé.

5 %

grès verdâtre, grains fins à moyens, sub-arrondis à arrondis,mal triés, chloriteux, parfois glauconitique, faiblement calcaireux,

35-40 mkb: 90 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre

10 % grès verdâtre, grains fins à moyens, sub-arrondis à arrondis,mal triés, chloriteux, parfois glauconitique, faiblement calcaireux

TR calcite de fractures,blanc

40-45 mkb: 100 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, très faiblement calcaireux.

45-50 mkb: 100 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, très faiblement calcaireux, excroissance de quartz emfumé (fractures).

50-55 mkb: 95 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, très faiblement calcaireux, rarement strié, très minéralisés.

5 % calcite de fractures, blanc

55-60 mkb:

60-65 mkb:

100 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, très faiblement calcaireux, rarement strié, petites veinules noires, semble être un ciment de calcite avec du bitume.

85 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, très faiblement calcaireux, rarement strié, petites veinules noires, semble être un ciment de calcite avec du bitume.

15 % calcaire brun clair à chamois foncé, microcristallin,

2

65 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, très faiblement calcaireux à peu calcaireux

30 % shale gris à gris moyen, ne réagit pas au HCL calcaire brun clair à chamois foncé, microcristallin, argileux, non-fossilières, parfois brun foncé, présence de stylolites. shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, très faiblement calcaireux à peu calcaireux, rarement strié. shale gris à gris moyen, ne réagit pas au HCL calcaire brun clair à chamois foncé, microcristallin, argileux, non-fossilières, parfois brun foncé, présence de stylolites.

shale gris à gris moyen, ne réagit pas au HCL

80-85 mkb:

5 %

85-90 mkb: 50 %

40 % 10 %

90-95 mkb: 55 %

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

65-70 mkb: 85 %

15 %

70-75 mkb: 60 %

40 %

75-80 mkb: 85 %

10 %

shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, parfois avec des inclusions de grains de quartz fins, anguleux. calcaire brun clair à chamois foncé, microcristallin, argileux, non-fossilières

shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre calcaire brun clair à chamois foncé, microcristallin, argileux, non-fossilières, parfois brun foncé, présence de stylolites.

shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, très faiblement calcaireux à peu calcaireux calcaire brun clair à chamois foncé, microcristallin, argileux, non-fossilières, parfois brun foncé, présence de stylolites.

5% calcite de fractures, blanc.

3

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

40 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, faiblement calcaireux.

5 % calcaire brun clair à chamois foncé, microcristallin, argileux, non-fossilières

95-100 mkb: 55 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, faiblement calcaireux

35 % shale gris à gris moyen, ne réagit pas au HCL 5 % calcaire brun clair à chamois foncé, microcristallin,

argileux, non-fossilières, parfois brun foncé, présence de stylolites.

5 % calcite de fractures, présence de micas, chlorite

100-105 mkb: 60 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, très faiblement calcaireux à peu calcaireux

30 % shale gris à gris moyen, ne réagit pas au HCL 5 % calcaire brun clair à chamois foncé, microcristallin,

argileux, non-fossilières, parfois brun foncé, présence de stylolites.

5% calcite de fractures, blanc.

105-110 mkb: 75 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à peu calcaireux

25 % shale gris à gris moyen, ne réagit pas au HCL, trace de pyrite

TR calcaire brun clair à chamois foncé, microcristallin, argileux, non-fossilières, parfois brun foncé, présence de stylolites.

110-115 mkb: 70 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à peu calcaireux

25 % shale gris à gris moyen, ne réagit pas au HCL, trace de pyrite

4

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

5 % calcite de fractures, blanc.. TR calcaire brun clair à chamois foncé, microcristallin,

argileux, non-fossilières

115-120 mkb: 90 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

5 % shale gris à gris moyen, ne réagit pas au HCL 5 % calcite de fractures, présence de micas, chlorite

120-125 mkb: 100 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

125-130 mkb: 100 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

130-135 mkb: 100 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

135-140 mkb: 90 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

10 % calcite de fractures, blanc

140-145 mkb: 95 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

5 % calcite de fractures, blanc

145-150 mkb: 95 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

5 % calcite de fractures, blanc TR calcaire brun foncé

5

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

150-155 mkb: 85 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, catcaireux à très calcaireux

15 % grès brun clair à blanc, silteux à grèseux,argileux, peut-être considéré comme un calcaire grèseux.

TR % calcite de fractures, blanc à brun pâle

155-160 mkb: 100 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

TR calcite de fractures, blanc à brun pâle, parfois pyriteux

160-165 mkb: 97,5 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

2,5% calcite de fractures, blanc à brun pâle, parfois pyriteux

165-170 mkb: 98 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

2 % calcite de fractures, blanc à brun pâle, parfois pyriteux TR calcaire grèseux, grains grossiers, (1-1,4 mm)

170-175 mkb: 80 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

15 % calcite de fractures, blanc à brun pâle, parfois pyriteux 5 % calcaire brun pâle, clair à brun foncé,parfois gréseux.

175-180 mkb: 95 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

5 % calcite de fractures, blanc à brun pâle, parfois pyriteux

180-185 mkb: 99 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux.

6

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1% calcite de fractures, blanc à brun pâle

185-190 mkb: 95 % shale gris moyen à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

5 % calcite de fractures, blanc à brun pâle

190-195 mkb: 97,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

2,5 % calcite de fractures, blanc à brun pâle, parfois pyriteux

195-200 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

5% calcite de fractures, blanc à brun pâle, parfois pyriteux

200-205 mkb: 97,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

2,5 % calcite de fractures, blanc à brun pâle, parfois pyriteux

205-210 mkb: 100 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

TR calcite de fractures, blanc à brun pâle, parfois pyriteux

210-215 mkb: 77,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

20 % calcaire brun clair, parfois blanc, brun foncé, texture cristalline moyenne, parfois gréseux.

2,5 % calcite de fractures, blanc à brun pâle, parfois pyriteux

215-220 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux.

5 % calcite de fractures, blanc à brun pâle, parfois pyriteux 7

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

220-225 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

5 % calcite de fractures, blanc à brun pâle

225-230 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

5 % calcite de fractures, blanc à brun pâle, parfois pyriteux

230-235 mkb: 98 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, peut-être qualifié de calcaire très argileux

2% calcite de fractures, blanc à brun pâle, parfois pyriteux

235-240 mkb: 99 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

1 % calcite de fractures, blanc à brun pâle, parfois pyriteux

240-245 mkb: 97,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

2,5 % calcite de fractures, blanc à brun pâle, parfois pyriteux

245-250 mkb: 87 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

10 % shale gris moyen, peu calcaireux 3 % calcite de fractures, blanc à brun pâle, parfois pyriteux

250-255 mkb: 97 % shale gris foncé, à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux. à très calcaireux

3 % calcite de fractures, blanc à brun pâle, parfois pyriteux 255-260 mkb: 90 % shale gris foncé, à noir, lustré, rarement pyriteux,

tendance gris brunâtre, calcaireux. à très calcaireux 10 % shale gris moyen, peu calcaireux TR calcite de fractures, blanc à brun pâle, parfois pyriteux

8

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

260-265 mkb: 94 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux

5 % shale gris moyen, peu calcaireux 1 % calcite de fractures, blanc à brun pâle

265-270 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

5 % shale gris moyen, peu calcaireux TR calcite de fractures, blanc à brun pâle, parfois pyriteux

270-275 mkb: 90 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

5 % shale gris moyen, peu calcaireux 5% calcite de fractures, blanc à brun pâle, parfois pyriteux

275-280 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

5 % shale gris moyen, peu calcaireux TR calcite de fractures, blanc à brun pâle, parfois pyriteux

280-285 mkb: 92,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux très calcaireux

5 % shale gris moyen, peu calcaireux 2,5 % calcite de fractures, blanc à brun pâle, parfois pyriteux

285-290 mkb: 92,5 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, trace de bitume

7,5 % calcite de fractures, blanc à brun pâle, parfois pyriteux TR shale gris moyen, peu calcaireux

290-295 mkb: 95 % shale gris foncé, à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux. à très calcaireux

9

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

5% calcite de fractures, blanc à brun pâle

295-300 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries

5 % calcite de fractures, blanc à brun pâle TR grès calcaireux, blanc à brun pâle, grains moyens.

300-305 mkb: 95 % shale gris â gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

5 % calcite de fractures, blanc à brun pâle, parfois pyriteux, cristallin moyen à grossier, plusieurs impurtés surtout de couleur noire, clivage de la calcite facilement observable.

TR grès très calcaireux

305-310 mkb: 90 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

7% calcite de fractures, blanc à brun pâle, parfois pyriteux. 3 % grès brun pâle à chamois, grains très fins à grossiers, mal

triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, quelques grains verdâtres, parfois pyriteux, calcaireux.

310-315 mkb: 80 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

15 % calcite de fractures, blanc à brun pâle, parfois pyriteux 5 % grès brun pâle à chamois, grains très fins à grossiers, mal

triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, quelques grains verdâtres, parfois pyriteux, calcaireux.

315-320 mkb: 85 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux très calcaireux

10 % grès brun pâle à chamois, grains très fins à grossiers, 10

2,5 %

mkb: 85 %

15 %

TR

mkb: 95 %

330-335

335-340

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, quelques grains verdâtres, parfois pyriteux, calcaireux.

5 % calcite de fractures, blanc à brun pâle

320-325 mkb: 75 ok

10% 5%

shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, certaines surfaces sont lisses (plan de friction-comme cuit-noir lustré) calcite de fractures, blanc à brun pâle grès brun pâle â chamois, grains très fins à grossiers, mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, quelques grains verdâtres, très pyriteux, calcaireux

325-330 mkb: 87,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

5 % grès brun pâle à chamois, grains très fins à grossiers, mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, quelques grains verdâtres, très pyriteux, calcaireux

5 % calcite de fractures, blanc à brun pâle, parfois pyriteux, cristallin moyen à grossier, plusieurs impurtés surtout de couleur noire, clivage de la calcite facilement observable shale gris moyen, peu calcaireux.

shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux. grès brun pâle à chamois, grains très fins à grossiers, mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, quelques grains verdâtres, parfois pyriteux, calcaireux. calcite de fractures, blanc à brun pâle, parfois pyriteux.

shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcai-

11

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

reux, présence de stries, certaines surfaces sont lisses (plan de friction-comme cuit-noir lustré), après immersion au HCL, le shale devient brun rouille et très finement laminé

5 % grès brun pâle à chamois, grains très fins à grossiers, mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, quelques grains verdâtres, très pyriteux, calcaireux

TR calcite de fractures, blanc à brun pâle

340-345 mkb: 97,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

2,5 % grès brun pâle à chamois, grains très fins à grossiers, mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, quelques grains verdâtres, très pyriteux, calcaireux

TIR calcite de fractures, blanc à brun pâle

345-350 mkb: pas d'échantillon.

350-355 mkb: 92 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

5 % grès brun pâle à chamois, grains très fins à grossiers, mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, quelques grains verdâtres, très pyriteux, calcaireux

2 % calcite de fractures, blanc â brun pâle, parfois pyriteux, cristallin moyen à grossier, plusieurs impurtés surtout de couleur noire, clivage de la calcite facilement observable

355-360 mkb: 97 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

3 % calcite de fractures, blanc à brun pâle, parfois pyriteux. TR calcaire gris brunâtre à brun, microcristallin

12

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

360-365 mkb: 98 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

2 % calcaire gris brunâtre à brun, microcristallin TR calcite de fractures, blanc à brun pâle

365-370 mkb: 100 %shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries

370-375 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très ., calcaireux, présence de stries.

5 % calcaire gris brunâtre à brun, microcristallin TR calcite de fractures, blanc à brun pâle

375-380 mkb: 93 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries

5 % calcite de fractures, blanc à brun pâle, parfois pyriteux, cristallin moyen à grossier, plusieurs impurtés surtout de couleur noire, clivage de la calcite facilement observable

2 % calcaire gris brunâtre à brun, microcristallin

380-385 mkb: 100 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

TR calcite de fractures, blanc à brun pâle, parfois pyriteux. TR calcaire gris brunâtre à brun, microcristallin.

385-390 mkb: 85 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

15 % calcaire blanc, brun clair à foncé, parfois silteux à gréseux, très argileux, beaucoup d'impurté

TR calcite de fractures, blanc à brun pâle, parfois pyriteux.

13

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

390-395 mkb: 80 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux â très calcaireux, présence de stries, parfois lisse.

20 % calcite de fractures, blanc à brun pâle • TR grès calcaireux TR calcaire brun clair

mkb: 90 %

10 %

mkb: 95 %

shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries. calcite de fractures, blanc à brun pâle, trace de bitume, silice.

shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

5 % calcite de fractures, blanc à brun pâle TR calcaire gris brunâtre à brun, microcristallin

395-400

400-405

405-410 mkb: 99 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries

1 % calcite de fractures, blanc à brun pâle, parfois pyriteux, cristallin moyen â grossier, plusieurs impurtés surtout de couleur noire, clivage de la calcite facilement observable

410-415 mkb: 97,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, calcaire argileux?.

2,5 % calcite de fractures, blanc à brun pâle, parfois pyriteux. TR calcaire gris brunâtre à brun, microcristallin.

415-420 mkb: 90 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux.

5 % calcaire blanc, brun clair à foncé, parfois silteux à gréseux, très argileux, beaucoup d'impurté

14

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

5 % calcite de fractures, blanc à brun pâle.

420-425 mkb: 96,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

2,5 % grès blanc, brun pâle à chamois, grains fins à très fins, mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, parfois pyriteux.

1 % calcaire brun clair à brun foncé. TR calcite de fractures, blanc à brun pâle

425-430 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

5 % calcaire brun clair à brun foncé, microcristallin, argileux. TR calcite de fractures, blanc à brun pâle, trace de bitume,

silice.

430-435 mkb: 97 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

2 % calcaire brun clair à brun foncé, microcristallin, argileux. 1 % calcite de fractures, blanc à brun pâle

435-440 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries

5 % calcaire brun clair à brun foncé, microcristallin, argileux. TR calcite de fractures, blanc à brun pâle, parfois pyriteux,

cristallin moyen à grossier, plusieurs impurtés surtout de couleur noire, clivage de la calcite facilement observable

440-445 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, calcaire argileux?.

5 % calcaire gris brunâtre à brun, microcristallin. TR calcite de fractures, blanc à brun pâle, parfois pyriteux.

15

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

445-450 mkb: 75 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

20 % calcite de fractures, blanc à brun pâle, venu de gaz à 449 mkb, (211 unités ou 2,1%)

3 % calcaire brun clair à brun foncé. 2 % grès blanc, brun pale à chamois, grains fins à très fins,

mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, fragments lithiques, parfois pyriteux.

450-455 mkb: 97,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

2,5 % calcaire brun clair à brun foncé, microcristallin, argileux.

455-460 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois silteux.

TR calcite de fractures, blanc à brun pâle

460-465 mkb: 94 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries

5 % grès brun pâle à chamois, grains fins à grossiers, tri moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, quelques grains verdâtres, parfois pyriteux, trace de glauconite.

1 % calcaire brun clair à brun foncé, microcristallin, argileux. TR calcite de fractures, blanc à brun pâle, parfois pyriteux,

cristallin moyen à grossier, plusieurs impurtés surtout de couleur noire, clivage de la calcite facilement observable

465-470 mkb: 97 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, calcaire argileux?.

16

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

2 % calcaire brun clair à brun foncé, microcristallin, argileux. 1 % calcite de fractures, blanc à brun pâle

470-475 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance. gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun clair à brun foncé, microcristallin, argileux. 475-480 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement

pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun clair à brun foncé, microcristallin, argileux. TR calcite de fractures, blanc à brun pâle

480-485 mkb: 90 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcaire brun clair à brun foncé, microcristallin, argileux.

485-490 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse

5 % calcaire brun clair à brun foncé. TR grès blanc, brun pâle à chamois, parfois gris pâle grains

fins à très fins, mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

490-495 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois pyriteux.

TR grés blanc, brun pâle à chamois, parfois gris pâle grains fins à très fins, mal triés, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

495-500 mkb: 85 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

17

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

10 % grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux..

5 % calcaire brun clair à brun foncé, microcristallin, argileux. TR calcite de fractures, blanc à brun pâle

500-505 mkb: 90 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

7,5 % calcaire brun clair à brun foncé, microcristallin, argileux. 2,5 % grès blanc, brun pâle à chamois, parfois gris pâle grains

moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

505-510 mkb: 65 % calcaire blanc à gris brun pâle, brunâtre, parfois grèseux, plusieurs trace de bitume, texture cristalline moyenne à grossière, semble recristallisé.

25 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

510-515 mkb: 60 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

30 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux.

10 % grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

515-520 mkb: 92,5 % shale gris à gris foncé, parfois noir, lustré, rarement 18

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

7,5 % calcaire brun clair à brun foncé, microcristallin, argileux.

520-525 mkb: 99 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

1 % calcaire brun clair à brun foncé, microcristallin, argileux.

525-530 mkb: 90 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcaire brun clair à brun foncé, microcristallin, argileux. TR grès blanc à gris pâle. TR calcaire brun clair à brun foncé, microcristallin, argileux.

530-535 mkb: 90 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcaire brun clair à brun foncé, microcristallin, argileux. TR grès blanc à gris pâle. TR calcaire brun clair à brun foncé, microcristallin, argileux.

535-540 mkb: 93 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun clair à brun foncé, microcristallin, argileux. 2 % calcite de fractures, blanc à brun pâle, parfois de la silice.

540-545 mkb: 94 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux.

1 % calcite de fractures, blanc à brun pâle, parfois de la silice, trace de bitume

TR grès blanc à brun pâle. 19

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

545-550 mkb: 92,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

7,5 % calcaire brun clair à brun foncé, microcristallin, argileux. TR

grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux

550-555 mkb: 94 % shale gris â gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun clair à brun foncé, microcristallin, argileux. 1 % grès blanc, brun pâle à chamois, parfois gris pâle grains

moyens, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux, grains de forme plutôt allongés

555-560 mkb: 87,5 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux

2,5 % calcite de fractures, blanc à brun pâle, parfois de la silice.

560-565 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, grèseux à silteux, trace de pyrite.

TR calcite de fractures, blanc à brun pâle, parfois de la silice.

565-570 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun clair à brun foncé, microcristallin, argileux. TR calcite de fractures, blanc à brun pâle, parfois de la silice. TR grès très pyriteux, blanc

20

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

570-575 mkb: 55 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

40 % grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

5% calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux

575-580 mkb: 75 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

20 % grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois silteux

TR calcite de fractures, blanc à brun pâle, parfois de la silice

580-585 mkb: 90 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

585-590 mkb: 98 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

1 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux

1 % grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux

21

SOQU1P ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

590-595 mkb: 97 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

2 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux

1 % grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

595-600 mkb: 90 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

7,5 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois silteux

2,5 % grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

600-605 mkb: 92 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

8 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois silteux à gréseux.

TR calcite de fractures, blanc à brun pâle, parfois de la silice.

605-610 mkb: 93 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse,beaucoup de veinules de calcite, quelques dégazement sur les retailles, peut-être qualifié de calcaire très argileux.

6 % calcite de fractures, blanc à brun pâle, parfois de la silice.

1 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux

610-615 mkb: 84 % shale gris à gris foncé, parfois noir, lustré, rarement 22

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

15 % calcite de fractures, blanc à brun pâle, parfois de la silice. 1 % calcaire brun clair à brun foncé, microcristallin, argileux,

parfois grèseux 615-620 mkb: 78 % shale gris à gris foncé, parfois noir, lustré, rarement

pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

20 % calcite de fractures, blanc à brun pâle, parfois de la silice. 2 % calcaire brun clair à brun foncé, microcristallin, argileux,

parfois gréseux TR grès blanc.

note: allure de zone perturbée

620-625 mkb: 78 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

20 % calcite de fractures, blanc à brun pâle, parfois de la silice. 2 % calcaire brun clair à brun foncé, microcristallin, argileux,

parfois gréseux TR grés blanc.

note: allure de zone perturbée

625-630 mkb: 85 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

15 % calcite de fractures, blanc à brun pâle, parfois de la silice. TR calcaire brun clair à brun foncé, microcristallin, argileux,

parfois silteux à grèseux..

630-635 mkb: 80 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse,beaucoup de veinules de calcite.

20 % calcite de fractures, blanc à brun pâle, parfois de la silice.

TR calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux.

23

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

635-640 mkb: 88 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcite de fractures, blanc à brun pâle, parfois de la silice. 2 % calcaire brun clair à brun foncé, microcristallin, argileux,

parfois grèseux

640-645 mkb: 95 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcite de fractures, blanc à brun pâle, parfois de la silice. TR grès blanc.

645-650 mkb: 87 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux /a silteux.

3 % calcite de fractures, blanc à brun pâle, parfois de la silice.

650-655 mkb: 94 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse,beaucoup de veinules de calcite.

5 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois grèseux.

1 % calcite de fractures, blanc à brun pâle, parfois de la silice.

655-660 mkb: 97 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

3 % calcaire brun clair à brun foncé, microcristallin, argileux, grèseux à silteux, trace de pyrite.

TR calcite de fractures, blanc à brun pâle, parfois de la silice.

660-665 mkb: 85 % shale gris à gris foncé, parfois noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse, inclusion de

24

SOQU1P ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

13 %

2 %

665-670 mkb: 95 %

5 %

TR TR

670-675 mkb: 90 %

10 %

TR

675-680 mkb: 97 %

3 %

TR TR

680-685 mkb: 98 %

quartz. calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux calcite de fractures, blanc à brun pâle, parfois de la silice.

shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse, aspect lustré. calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux calcite de fractures, blanc à brun pâle, parfois de la silice. grès blanc â brun clair, grains moyens, sub-arrondis, tri moyen à bon, quartz translucides, très calcaireux, les grains ne se supportent pas.

shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse. calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux calcite de fractures, blanc à brun pâle, parfois de la silice.

shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse. calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux /a silteux. calcite de fractures, blanc à brun pâle, parfois de la silice. grès blanc à brun clair, grains moyens, sub-arrondis, tri moyen à bon, quartz translucides, très calcaireux, les grains ne se supportent pas.

shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse..

2 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois grèseux.

TR calcite de fractures, blanc à brun pâle, parfois de la silice. 25

SOQU1P ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

685-690 mkb:

690-695 mkb:

695-700 mkb:

700-705 mkb:

705-710 mkb:

90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse, aspect lustré.

10 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux à silteux, pyriteux par endroit.

TR calcite de fractures, blanc à brun pâle, parfois de la silice.

90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois grèseux.

TR calcite de fractures, b anc à brun pâle, parfois de la silice.

100 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

50 % shale gris foncé à noi lustré, rarement pyriteux, tendance gris brunâtre, calcai .-)ux à très calcaireux, présence de stries, parfois lisse.

40 % calcite de fractures, blanc à brun pâle, parfois de la silice. 5 % calcaire brun clair à brun foncé, microcristallin, argileux,

parfois gréseux /a silteux. 5 % grès blanc à brun clair, grains moyens à grossiers, sub-

arrondis, tri moyen à bon, quartz translucides, très calcaireux.

65 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse..

20 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, grèseux à silteux

10 % grès blanc à brun clair, grains moyens à grossiers, sub-arrondis, tri moyen à bon, quartz translucides, très calcaireux.

5 % calcite de fractures, blanc à brun pâle, parfois de la silice.

26

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

710-715 mkb: 97 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

3 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois gréseux.

715-720 mkb: 85 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcaire brun clair à brun foncé, microcristallin, argileux, grèseux à silteux, trace de pyrite.

5 % calcite de fractures, blanc à brun pâle, parfois de la silice.

720-725 mkb: 90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % grès blanc à brun clair, grains moyens à grossiers, sub-arrondis, tri moyen à bon, quartz translucides, très calcaireux.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux à silteux.

TR calcite de fractures, blanc à brun pâle, parfois de la silice.

725-730 mkb: 85 % shale gris fàncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, grèseux à silteux

5 % grès blanc à brun clair, grains moyens, arrondis, tri moyen à bon, quartz translucides, très calcaiteux, micasé par endroit

730-735 mkb: 95 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun à brun foncé, très grèseux à silteux, parfois argileux,microcristallin à cristallin.

TR grès blanc à brun clair. 27

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

735-740 mkb: 90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois grèseux

TR grès blanc à brun pâle..

740-745 mkb: 85 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % grès blanc à brun clair, grains fins à moyens sub-arrondis, tri moyen à bon, quartz translucides, très calcaireux, peut-être un calcaire grèseux.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, gréseux à silteux, trace de pyrite.

TR calcite de fractures, blanc à brun pâle, parfois de la silice.

745-750 mkb: 95 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireu'. à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux /a silteux.

750-755 mkb: 90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

10 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, grèseux à silteux

755-760 mkb: 95 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun à brun foncé, très gréseux à silteux, parfois argileux,microcristallin à cristallin.

760-765 mkb: 90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

28

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

5 % grès blanc, brun pâle à chamois, parfois gris pâle grains moyens, tri bon'à moyen, sub-arrondis à arrondis, ciment de calcite, parfois argileux, quartz translucides, parfois pyriteux.

5 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois gréseux

765-770 mkb: 90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

5 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois gréseux.

5 % calcite de fractures, blanc à brun pâle. TR grès blanc à brun pâle.

770-775 mkb: 75 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, parfois lisse.

25 % calcaire brun clair â brun foncé, microcristallin, argileux, gréseux à silteux, trace de pyrite

775-780 mkb: 90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, échantillon en poudre

10 .% calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux /a silteux.

780-785 mkb: 90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

10 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, gréseux à silteux

785-790 mkb: 80 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries..

18 % calcaire brun à brun foncé, très gréseux â silteux, parfois argileux,microcristallin à cristallin.

29

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

790-795 mkb:

795-800 mkb:

800-805 mkb:

805-810 mkb:

2 % grès blanc, brun pâle à,ahamois, parfois gris pâle grains moyens, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, parfois argileux, quartz translucides, parfois pyriteux.

88 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

10 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois grèseux.

2 % calcite de fractures, blanc à brur pâle.

90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

8 % calcaire brun clair à brun foncé, microcristallin, argileux, grèseux, trace de pyrite.

2 % calcite de fractures, blanc à brun pâle

80 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries. .

15 % calcite de fractures, présence de silice, couleur blanche à brun clair

5 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux à silteux.

TR grès blanc, brun pâle à chamois, parfois gris pâle grains moyens à grossiers, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux.

70 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

25 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, gréseux à silteux.

5 % calcite de fractures, présence de silice, couleur blanche à brun clair

30

SOQU1P ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

810-815 mkb:

815-820 mkb:

820-825 mkb:

825-830 mkb:

830-835 mkb:

82 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

15 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois grèseux.

3 % calcite de fractures, blanc à brun pâle.

80 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

15 % calcite de fractures, blanc à brun pâle, trace de bitume, présence de silice, microcristallin.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, grèseux, trace de pyrite.

55 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

35 % grés blanc, brun pâle à chamois, parfois gris pâle grains moyens à fins, tri bon à moyen, sub-arrondis à arrondis, ciment de calcite, quartz translucides, parfois pyriteux, argileux par endroit.

10 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux à silteux

TR calcite de fractures, présence de silice, couleur blanche à brun clair

85 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

10 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, grèseux à silteux.

5 % calcite de fractures, présence de silice, couleur blanche à brun clair

80 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

31

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

835-840 mkb:

840-845 mkb:

845-850 mkb:

850-855 mkb:

855-860 mkb:

15 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois grèseux.

5 % calcite de fractures, blanc à brun pâle.

75 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

15 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois gréseux.

10 % calcite de fractures, blanc à brun pâle.

85 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stnes.

10 % calcite de fractures, blanc à brun pâle, trace de bitume, présence de silice, microcristallin.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, grèseux, trace de pyrite.

95 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

4 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux à silteux

1 % calcite de fractures, présence de silice, couleur blanche à brun clair

85 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

15 % calcite de fractures, présence de silice, couleur blanche à brun clair

85 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

10 % calcite de fractures, présence de silice, couleur blanche à brun clair.

32

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

5 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois grèseux.

860-865 mkb:

865-870 mkb:

870-875 mkb:

875-880 mkb:

90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

8 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois grèseux.

1 % calcite de fractures, blanc à brun pâle. 1 % grès blanc à brun pâle.

60 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

35 % calcaire gris pâle à gris clair, texture sucrosique argileux quelques petites impurtés de couleur brun foncé.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, gréseux, trace de pyrite

TIR calcite de fractures, blanc à brun pâle

97 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

1 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux à silteux

1 % calcite de fractures, présence de silice, couleur blanche à brun clair.

1 % grès blanc â brun pâle.

93 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois grèseux à silteux

2 % calcite de fractures, présence de silice, couleur blanche à brun clair

880-885 mkb: 97 % shale noir, d'allure bitumineux, gris foncé, calcaireux, 33

SOQUIP ST-FLAV1EN NO 8 DESCRIPTION LITHOLOGIQUE

réagit au HCL, devient brun rouille, matières organiques, très finement laminées

3 %

calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois gréseux.

885-890 mkb:

890-895 mkb:

895-900 mkb:

900-905 mkb:

905-910 mkb:

85 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

10 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois gréseux.

5 % calcite de fractures, blanc à brun pâle.

93 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

5 % calcaire brun clair à brun foncé, microcristallin, argileux, gréseux, trace de pyrite

2 % calcite de fractures, blanc â brun pâle

95 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stnes.

3 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux à silteux

2 % calcite de fractures, présence de silice, couleur blanche à brun clair.

96 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

2 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux à silteux

2 % calcite de fractures, présence de silice, couleur blanche à brun clair

100 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

34

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

910-915 mkb:

915-920 mkb:

920-925 mkb:

925-930 mkb:

930-935 mkb:

85 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

10 % calcaire brun clair à brun foncé, microcristallin, argileux à très argileux, parfois gréseux.

5 % calcite de fractures, blanc à brun pâle.

80 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

15 % calcaire brun clair à brun foncé, microcristallin, argileux, gréseux, trace de pyrite

5 % calcite de fractures, blanc à brun pâle

75 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries, shale noir peu calcaireux.

20 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux à silteux

5 % calcite de fractures, présence de silice, couleur blanche à brun clair.

70 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

20 % calcite de fractures, présence de silice, couleur blanche à brun clair

10 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux à silteux

90 % shale gris foncé à noir, lustré, rarement pyriteux, tendance gris brunâtre, calcaireux à très calcaireux, présence de stries.

10 % calcaire brun clair à brun foncé, microcristallin, argileux, parfois gréseux à silteux

TR calcite de fractures, présence de silice, couleur blanche à brun clair.

35

SOQUIP ST-FLAV1EN NO 8 DESCRIPTION LITHOLOGIQUE

935-940 mkb: 92,5 % shale gris foncé à noir, parfois striés, aspect lustré, calcaireux à très calcaireux,rarement brunâtre..

5 % calcaire brun à brun foncé, microcristallin argileux, gréseux, grains moyens à fins, flottent dans la pate

2,5 % calcite de fractures, blanc, trace de bitume

940-945 mkb: 87,5 % shale gris foncé à noir, parfois striés, aspect lustré, calcaireux à très calcaireux,rarement brunâtre

10 % calcaire brun à brun foncé, microcristallin argileux, gréseux, grains moyens à fins, flottent dans la pate

2,5 % calcite de fractures, blanc, trace de bitume

945-950 mkb: 90 % shale gris foncé à noir, brunâtre parfois striés, aspect lustré, calcaireux à très calcaireux, pyriteux par endroit

7,5 % calcite de fractures, blanc, trace de bitume 2,5 % calcaire brun à brun foncé, microcristallin argileux,

gréseux, grains moyens à fins, flottent dans la pate

950-955 mkb: 98 % shale noir surtout (calcaireux),gris foncé, brunâtre parfois striés, aspect lustré, très calcaireux, pyriteux par endroit,

1 % calcaire brun à brun foncé, microcristallin argileux, gréseux, grains moyens à fins, flottent dans la pate

1 % calcite de fractures, blanc

955-960 mkb: 90 % shale noir surtout (calcaireux),gris foncé, parfois striés, aspect lustré, calcaireux, pyriteux par endroit.

10 % calcaire brun à brun foncé, microcristallin argileux, gréseux, grains moyens à fins, flottent dans la pate

TR calcite de fractures, blanc

960-965 mkb 90 % shale gris foncé à noir, brunâtre parfois striés, aspect lustré, calcaireux à très calcaireux, pyriteux par endroit

8 % calcaire brun à brun foncé, microcristallin argileux, gréseux à silteux.

2 % calcite de fractures, blanc

36

SOQUIP ST-FLAVIEN-NO 8 DESCRIPTION LITHOLOGIQUE

965-970 mkb: 72,5 % shale. gris foncé à noir, calcaireux à très calcaireux, parfois pyriteux, aspect lustré,

20 % calcaire brun à brun foncé, parfois brun pâle, argileux à très argileux, microcristallin, parfois grèseux à silteux.

7,5 % calcite de fractures, blanc, parfois brun pâle, trace de bitume

970-975 mkb: 65 % shale gris foncé à noir, calcaireux à très calcaireux, parfois pyriteux, aspect lustré,

30 % caicalre brun à brun foncé, parfois brun pâle, argileux à très argileux, microcristallin, parfois grèseux à silteux.

5 % grès brun clair à brun, grains moyens, sub-arrondis à arrondis, très calcaireux.

TR calcite de fractures, blanc, parfois brun pâle, trace de bitume

975-980 mkb: 90 % shale gris foncé à noir, calcaireux à très calcaireux, parfois brunâtre, parfois pyriteux, aspect lustré, présence de stries à l'occasion

7,5 % calcite de fractures, blanc, parfois brun pâle. 2,5 % caicalre brun à brun foncé, parfois brun pâle, argileux à

très argileux, microcristallin, parfois gréseux à silteux.

980-985 mkb:

985-990 mkb:

990-995 mkb:

77,5 % shale gris foncé à noir, calcaireux à très calcaireux, parfois brunâtre, parfois pyriteux, aspect lustré, présence de stries à l'occasion

15 % calcaire brun à brun foncé, parfois brun pâle, argileux à très argileux, microcristallin, parfois grèseux à silteux.

7,5 % calcite de fractures, blanc, parfois brun pâle.

pas d'échantillon, échantillon retrouvé, (IDEM) à 985 mkb

92,5 % shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, parfois pyriteux, aspect lustré, présence de stries.

7,5 % caicalre brun à brun foncé, parfois brun pâle, argileux à très argileux, microcristallin, parfois gréseux à silteux

37

995-1000 mkb: 90 %

10 %

TR

1000-1005 mkb: 87 %

10 %

1005-1010

1 %

mkb: 100 % shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

shale gris foncé à noir, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré. calcaire brun à brun foncé, argileux, parfois très argileux, grèseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre. calcite de fractures, blanc à brun pâle,

shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré, calcaire brun à brun foncé, argileux, parfois très argileux, grèseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre.

2 % grès très calcaireux, peut-être un calcaire gréseux, grains moyens à grossiers, tri moyen, argileux, brun à brun foncé. calcite de fractures, blanc à brun pâle.

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1010-1015

1015-1020

1020-1025

mkb: 95 %

5 %

TR

mkb: 98 %

2%

TR

mkb: 100%

TR

shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré. calcaire brun à brun foncé, argileux, parfois très argileux, grèseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, flottent dans la pâte calcite de fractures, blanc à brun pâle.

shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré. calcaire brun à brun foncé, argileux, parfois très argileux, gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, flottent dans la pâte calcite de fractures, blanc à brun pâle.

shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré. calcaire brun à brun foncé, argileux, parfois très argileux

38

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1025-1030 mkb: 90 % shale gris foncé à noir, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

10 % calcaire brun à brun foncé, argileux, parfois très argileux, gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre.

TR calcite de fractures, blanc à brun pâle,

1030-1035 mkb: 95 % shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré,

5 % calcaire brun à brun foncé, argileux, parfois très argileux, grèseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre.

1035-1040 mkb: 95 % shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

5 % calcaire brun à brun foncé, argileux, parfois très argileux, grèseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre

TR grès blanc à brun pâle, grains moyens à grossiers, tri moyen, arrondis, très calcaireux

1040-1045 mkb: 95 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

5 % calcaire brun à brun foncé, argileux, parfois très argileux, grèseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, flottent dans la pâte

1045-1050 mkb: 95 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

5 % calcaire brun à brun foncé, argileux, parfois très argileux, gréseux, grains moyens à grossiers, parfois fins, flottent dans la pâte

TR calcite de fractures, blanc à brun pâle.

1050-1055 mkb: 82,5 % shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

10 % calcaire brun à brun foncé, argileux, parfois très argileux 39

7,5 % TR

1055-1060 mkb: 74 %

15 %

10 %

SOQUIP ST-FLAV1EN NO 8 DESCRIPTION LITHOLOGIQUE

gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre. parfois gris clair calcite de fractures, blanc à brun pâle. calcaire? ou dolomie?, brun pâle à brun clair, argileux, texture sucrosique (microcristallin), parfois silteux, réagit peu au HCL, dolomitique?

shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré, calcaire brun à brun foncé, argileux, parfois très argileux, gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre. calcite de fractures, blanc à brun pâle.

1 % calcaire? ou dolomie?, brun pâle à brun clair, argileux, texture sucrosique (microcristallin), parfois silteux, réagit peu au HCL, dolomitique?

1060-1065 mkb: 87,5 % shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés (abondant), aspect lustré

7,5 % grès blanc à gris pâle, grains moyens à grossiers, tri moyen, arrondis, très calcaireux.

5 % calcaire brun à brun foncé, argileux, parfois très argileux, gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre

TR calcite de fractures, blanc à brun pâle.

1065-1070 mkb: 86 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés (abondant), aspect lustré.

8 % calcite de fractures, blanc à brun pâle. 5 % calcaire brun à brun foncé, argileux, parfois très argileux,

gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins,

1 % calcaire? ou dolomie?, brun pâle à brun clair, argileux, texture sucrosique (microcristallin), parfois silteux, réagit peu au HCL, dolomitique?

40

SOQU1P ST-FLAV1EN NO 8 DESCRIPTION LITHOLOGIQUE

1070-1075 mkb: 80 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré,

10 % calcaire brun à brun foncé, argileux, parfois très argileux, gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre.

10 % calcite de fractures, blanc à brun pâle, trace de bitume.

1075-1080 mkb: 85 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré,

10 % calcaire brun à brun foncé, argileux, parfois très argileux, gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre.

5 % calcite de fractures, blanc à brun pâle, trace de bitume.

1080-1085 mkb: 80 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés (abondant), aspect lustré.

15 % calcaire brun à brun foncé, argileux, parfois très argileux, gréseux à silteux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins.

5 % calcite de fractures, blanc à brun pâle.

1085-1090 mkb: 85 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

10 % calcaire brun à brun foncé, argileux, parfois très argileux, gréseux, grains moyens à grossiers, parfois fins, flottent dans la pâte

5 % calcite de fractures, blanc à brun pâle.

1090-1095 mkb: 75 % shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

15 % calcaire brun à brun foncé, argileux, parfois très argileux, silteux à gréseux, grains fins à moyens, sub-arrondis à arrondis, flottent dans la matrice calcaireuse.

10 % calcite de fractures, blanc à brun pâle.

1095-1100 mkb: 85 % shale noir à gris foncé, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré

41

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

10 % calcaire brun à brun foncé, argileux, parfois très argileux, gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre.

5 % calcite de fractures, blanc à brun pâle, trace de bitume.

1100-1105 mkb: 80 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré,

15 % calcaire brun à brun foncé, argileux, parfois très argileux, grèseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre.

5 % calcite de fractures, blanc à brun pâle, trace de bitume.

1105-1110 mkb: 90 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré,

7,5 % calcaire brun à brun foncé, argileux, parfois très argileux, grèseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre.

1,5 % calcite de fractures, blanc à brun pâle, trace de bitume. 1 % grès blanc à gris pâle, grains moyens à grossiers, tri

moyen, arrondis, très calcaireux.

1110-1115 mkb: 78 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés (abondant), aspect lustré.

20 % calcaire brun à brun foncé, argileux, parfois très argileux, grèseux à silteux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins.

2 % calcite de fractures, blanc à brun pâle.

1115-1120 mkb: 84 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

10 % calcaire brun à brun foncé, argileux, parfois très argileux, grèseux, grains moyens à grossiers, parfois fins, flottent dans la pâte

5 % calcite de fractures, blanc à brun pâle. TR calcaire brun pâle, texture sucrosique, argileux

1120-1125 mkb: 72,5 % shale noir à gris foncé, parfois brunâtre, calcaireux à très

42

SOQU1P ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

calcaireux, pyriteux par endroit, striés, aspect lustré. 20 % calcaire brun à brun foncé, argileux, parfois très argileux,

gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre.

7,5 % calcite de fractures,.blanc à brun pâle, trace de bitume.

1125-1130 mkb: 72,5 % shale noir à gris foncé, brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré, veinules de calcite abondantes

25 % calcaire brun à brun foncé, argileux, parfois très argileux, parfois gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre, trace de bitume

2,5 % calcaire brun pâe à chamois, parfois blanc à brun foncé, légèrement argileux, très pyriteux, crypto à microcristallin, fantômes de fossiles (aiguille noir, forme rectangulaire)

1130-1135 mkb: 91,5 % shale noir à gris foncé, brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré,

7,5 % calcaire brun à brun foncé, argileux, parfois très argileux, silteux à gréseux, grains moyens à grossiers, sub-arrondis à arrondis, parfois fins, tri moyen à pauvre.

1 % calcaire brun pâle à chamois, parfois blanc à brun foncé, légèrement argileux, très pyriteux, crypto à microcristallin, fantômes de fossiles

TR calcite de fractures, blanc à brun pâle, trace de bitume.

1135-1140 mkb: 96,5 % shale noir à gris foncé, brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés (abondant), aspect lustré.

2,5 % calcaire brun à brun foncé, argileux, parfois très argileux, gréseux à silteux,

1 % calcaire brun pâle à chamois, parfois blanc à brun foncé, légèrement argileux, très pyriteux, crypto à microcristallin, fantômes de fossiles

TR calcite de fractures, blanc à brun pâle.

1140-1145 mkb: 89 % shale noir à gris foncé, surtout brunâtre, calcaireux à très

43

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

calcaireux, pyriteux par endroit, striés, aspect lustré, veinules de calcite abondantes

10 % calcaire brun à brun foncé, argileux, parfois très argileux, parfois gréseux à silteux.

1 % calcite de fractures, blanc à brun pâle, trace de bitume. TR grès blanc à brun pâle, grains moyens à grossiers, ciment

de calcite. TR calcaire brun pâle à chamois, parfois blanc à brun foncé,

légèrement argileux, très pyriteux, crypto à microcristallin, fantômes de fossiles.

1145-1150 mkb: 87,5 % shale noir à gris foncé, brunâtre,(abondance de shale gris moyen, lustré, calcaireux à peu calcaireux), pyriteux par endroit, striés, aspect lustré, veinules de calcite, calcaireux à très calcaireux.

10 % calcaire brun à brun foncé, argileux, parfois très argileux, parfois gréseux à silteux, trace de bitume, pyriteux.

2,5 % calcite de fractures, blanc à brun pâle, trace de bitume TR calcaire brun pâle à chamois, parfois blanc à brun foncé,

légèrement argileux, très pyriteux, crypto à microcristallin, fantômes de fossiles

1150-1155 mkb: 80 % shale noir à gris foncé, brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré,

10 % calcaire brun à brun foncé, argileux, parfois très argileux, silteux à gréseux.

10 % calcite de fractures, blanc à brun pâle, trace de bitume.

11 5 5- 1160 mkb: 89 % shale noir à gris foncé,parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés (abondant), aspect lustré.

10 % calcaire brun â brun foncé, argileux, parfois très argileux, gréseux à silteux, flottent dans la pâte

1 % calcite de fractures, blanc à brun pâle.

1160-1165 mkb: 75 % shale noir à gris foncé, surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

20 % calcaire brun à brun foncé, argileux, parfois très argileux, silteux gréseux, flottent dans la pâte.

44

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

2,5 % calcaire brun pâle à chamois, parfois blanc à brun foncé, légèrement argileux, très pyriteux, crypto à microcristallin, fantômes de fossiles.

2,5 % calcite de fractures, blanc à brun pâle, trace de bitume

1165-1170 mkb: 55 % shale noir à gris foncé, brunâtre, lustré, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré, veinules de calcite.

35 % calcaire brun à brun foncé, argileux, parfois très argileux, parfois gréseux à silteux, trace de bitume, pyriteux, présence de nodules noirs taille moyenne (1 mm) ou d'oolites, ou même de pisolites?, croute de couleur noir avec l'intérieur brun jaunâtre comme pyriteux, forme concentrique avec un coeur noir, parfois gris.

7,5 % calcaire brun pâle à chamois, parfois blanc à brun foncé, légèrement argileux, très pyriteux, crypto à microcristallin, fantômes de fossiles, présence de brachiopodes.

2,5 % calcite de fractures, blanc à brun pâle. 1170-1175 mkb: 44 % shale noir à gris foncé, brunâtre, calcaireux à très

calcaireux, pyriteux par endroit, striés, aspect lustré, 50 % calcaire brun pâle à gris brunâtre, parfois brun, argileux à

légèrement argileux,microcristallin, présence de stylolites, parfois d'allure moucheté noir, présence de fossiles parfois grèseux à silteux, trace de bitume, pyriteux, présence de nodules noirs taille moyenne (1 mm) ou d'oolites, ou même de pisolites?, croute de couleur noir avec l'intérieur brun jaunâtre comme pyriteux, forme concentrique avec un coeur noir, parfois gris.

5 % calcaire brun pâle à chamois, parfois blanc à brun foncé, légèrement argileux, très pyriteux, crypto à microcristallin, fantômes de fossiles, présence de brachiopodes

1 % calcite de fractures, blanc à brun pâle, trace de bitume.

11 75-1180 mkb: 72,5 % shale noir à gris foncé,parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

25 % calcaire brun pâle à gris brunâtre, parfois brun, argileux à légèrement argileux,microcristallin, présence de stylolites, parfois d'allure moucheté noir, présence de fossiles

45

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

parfois grèseux à silteux, trace de bitume, pyriteux. 2,5 % calcaire brun pâle à chamois, parfois blanc à brun foncé,

légèrement argileux, très pyriteux, crypto à microcristallin, fantômes de fossiles, présence de brachiopodes.

1180-1185 mkb: 93 % shale noir à gris foncé, brunâtre, lustré, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré, veinules de calcite.

5 % calcaire brun à brun foncé, argileux, parfois très argileux, parfois grèseux à silteux, trace de bitume, pyriteux,

2 % calcaire brun pâle à chamois, parfois blanc à brun foncé, légèrement argileux, très pyriteux, crypte à microcristallin, fantômes de fossiles, présence de brachiopodes.

carotte 1189-1195 mkb çar9jte no-1; 1198-1192,,25 _ mkb. carotte no-2; 1192,25-1195 mkb

1195-1200 mkb: 97 % shale noir à gris foncé,(calcaireux), parfois gris moyen (5 %), peu à pas calcaireux, brunâtre, plusieurs surface lisse parfois strié

2 % calcaire brun pâle à gris brunâtre, parfois brun, argileux à légèrement argileux, microcristallin à cristallin moyen.

1 % calcite de fractures, blanc à brun pâle, trace de bitume.

1200-1205 mkb: 99 % shale noir à gris foncé,rarement gris moyen, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

1 % calcaire brun à brun foncé, argileux â légèrement argileux,microcristallin, parfois silteux, trace de bitume

1205-1210 mkb: 89 % shale noir à gris foncé, parfois gris moyen, parfois brunâtre, rayable, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

10 % calcaire brun pâle, brun à brun foncé, argileux à légèrement argileux, microcristallin à cristallin moyen, parfois silteux, trace de bitume.

1 % calcite de fractures, blanc.

46

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1210-1215 mkb: 66,5 % shale noir à gris foncé, brunâtre, lustré, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré, veinules de calcite surface lisse,.

30 % calcaire brun à brun foncé, argileux, parfois très argileux, parfois silteux, tracé de bitume, pyriteux, cristallin moyen à microcristallin

2,5 % calcaire brun pâle à chamois, parfois brun foncé, légèrement argileux, crypte à microcristallin, fantômes de fossiles,

1 % calcite de fractures, blanc à brun clair, présence de la silice

1215-1220 mkb: 50 % shale noir à gris foncé,(calcaireux), parfois gris moyen, peu à pas calcaireux, brunâtre, plusieurs surface lisse parfois strié présence de graptolites

35 % calcaire brun pâle, brun à brun foncé, argileux à légèrement argileux, microcristallin à cristallin moyen, parfois silteux, trace de bitume.

10 % calcaire brun pâle à chamois, parfois brun foncé, légèrement argileux, crypto à microcristallin, fantômes de fossiles.

5 % calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, présence de fossiles, pyriteux.

1220-1225 mkb: 66 % shale noir à gris foncé,rarement gris moyen, parfois brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

30 % calcaire brun à brun foncé, argileux à légèrement argileux,microcristallin, parfois silteux, trace de bitume.

2 % calcaire brun pâle à chamois, parfois brun foncé, légèrement argileux, crypto à microcristallin, fantômes de fossiles.

2 % calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, présence de fossiles, pyriteux.

1225-1230 mkb: 40 % shale noir à gris foncé, parfois gris moyen, parfois brunâtre, rayable, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

47

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

57,5 % calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, présence de fossiles, pyriteux.

2,5 % calcaire brun à brun foncé, argileux, parfois très argileux, parfois silteux, trace de bitume, pyriteux, cristallin moyen à microcristallin

1230-1235 mkb: 55 % shale noir à gris foncé, surtout brunâtre, lustré, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré, surface lisse.

30 % calcaire brun à brun foncé, argileux, parfois très argileux, parfois silteux, trace de bitume, pyriteux, cristallin moyen à microcristallin

15 % calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, présence de fossiles, pyriteux.

1235-1240 mkb: 90 % shale noir à gris foncé,(calcaireux), brunâtre, plusieurs surface lisse parfois strié

10 % calcaire brun pâle, brun à brun foncé, argileux à légèrement argileux, microcristallin à cristallin moyen, parfois silteux, trace de bitume.

1240-1245 mkb: 90 % shale noir à gris foncé,surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

10 % calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, présence de fossiles, pyriteux. présence de stylolites

1245-1250 mkb: 77,5 % shale noir à gris foncé, parfois brunâtre, rayable, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré, trace de graptolites.

20 % calcaire brun pâle, brun à brun foncé, argileux à légèrement argileux, microcristallin à cristallin moyen, parfois silteux, trace de bitume.

2,5 % calcaire brun foncé à brun, parfois silteux.

1250-1255 mkb: 85 % shale noir à gris foncé, surtout brunâtre, rayable, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

48

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

10 % calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, présence de fossiles, pyriteux.

5 %

calcaire brun à brun foncé, argileux, parfois très argileux, parfois silteux, trace de bitume, pyriteux, cristallin moyen à microcristallin

1255-1260 mkb: 55 % shale noir à gris foncé, surtout brunâtre, lustré, calcaireux à très calcaireux, pyriteux par endroit, aspect lustré, surface lisse.

37,5 % calcaire brun à brun foncé, argileux, parfois très argileux, parfois silteux, trace de bitume, pyriteux, cristallin moyen à microcristallin

7,5 % calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, présence de fossiles, pyriteux.

1260-1265 mkb: 80 % calcaire gris moyen à foncé, légèrement brunâtre, argileux, finement critallin, peu fossilifère, dureté moyenne, laminé par endroit, avec trace de bitumes

10 % calcaire gris brunâtre, parfois brunâtre, microcristallin (sucrosique), fossilifères, (brachiopodes, briozoaires, fragments fossiles)parfois brun très pâle à blanc, argileux, présences de stylolites.

10 % shale noir â gris foncé,surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

1265-1270 mkb: 70 % calcaire gris moyen à foncé, légèrement brunâtre, argileux, finement critallin, peu fossilifère, dureté moyenne, laminé par endroit, avec trace de bitumes

15 % calcaire gris brunâtre, parfois brunâtre, microcristallin (sucrosique), fossilifères, (brachiopodes, briozoaires, fragments fossiles)parfois brun très pâle à blanc, argileux, présences de stylolite.

15 % shale noir à gris foncé, parfois brunâtre, rayable, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

1270-1275 mkb: 80 % calcaire gris moyen à foncé, légèrement brunâtre, argileux, finement critallin, peu fossilifère, dureté moyenne, laminé par endroit, avec trace de bitumes

49

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

15 % calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne, présence de fossiles, (spicule d'éponge ?) parfois silteux, présence de stylolites pyriteux.

5 % shale noir à gris foncé, surtout brunâtre, lustré, calcaireux à très calcaireux, pyriteux par endroit, aspect lustré, surface lisse.

1275-1280 mkb: 70 % calcaire blanc à gris pâle, parfois brun clair, argileux, dureté moyenne , présence de fossiles, parfois silteux friable surtout la couleur blanche, pyriteux.

25 % calcaire gris foncé à brun à brun foncé, argileux, parfois très argileux, parfois silteux, trace de bitume, pyriteux, cristallin moyen à microcristallin, peu fossilifère.

5 % calcite de fractures, blanc.

1280-1285 mkb: 85 % calcaire gris moyen à foncé, légèrement brunâtre, parfois brun foncé, argileux, finement cristallin, (sucrosique),.parfois arénacé, fossilifère, dureté moyenne, laminé par endroit, avec trace de bitumes, présence de stylolites, parfois pyriteux

15 % calcaire blanc à gris brunâtre très pâle, parfois brunâtre, microcristallin (sucrosique) à fin, friable par endroit, fossilifères, (brachiopodes, briozoaires, fragments fossiles argileux, présences de stylolites.

TR shale noir à gris foncé,surtout brunâtre, calcaireux à très calcaireux, pyriteux par endroit, striés, aspect lustré.

1285-1290 mkb: 95 % calcaire gris moyen à foncé, légèrement brunâtre, argileux, finement critallin, fossilifères, dureté moyenne, laminé par endroit, avec trace de bitumes

5 % shale noir, calcaireux à très calcaireux, pyriteux par endroit, légèrement silteux.

1290-1295 mkb: 55 % shale gris à gris brunâtre, légèrement silteux, pyriteux, friable, peu calcaireux à calcaireux.

45 % calcaire gris moyen à foncé, légèrement brunâtre, parfois brun foncé, argileux, finement cristallin, (sucrosique),.parfois arénacé, fossilifère, dureté moyenne, laminé par endroit, avec trace de bitumes, présence de

50

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

stylolites, parfois pyriteux.

1295-1300 mkb: 60 % calcaire gris moyen à foncé, légèrement brunâtre, parfois brun foncé, argileux, finement cristallin, (sucrosique),.parfois arénacé, fossilifère, dureté moyenne, laminé par endroit, avec trace de bitumes, présence de stylolites, parfois pyriteux

40 % shale gris à gris brunâtre, légèrement silteux, pyriteux, friable, peu calcaireux à calcaireux.

1300-1305 mkb: 80 % calcaire gris moyen à foncé, légèrement brunâtre, parfois brun foncé, argileux, finement cristallin, (sucrosique),.parfois arénacé, fossilifère, dureté moyenne, laminé par endroit, avec trace de bitumes, présence de stylolites, parfois pyrite.

20 % shale gris à gris brunâtre, légèrement silteux, pyriteux, friable, peu calcaireux à calcaireux.

1305-1310 mkb: échantillon non-représentatif, trip et alésage du puits.

1310-1315 mkb 65 % calcaire brun pâle â gris pâle à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux.

30 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé.

1315-1320 mkb: 79 % calcaire brun pâle à gris pâle à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux.

20 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

1 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé, trace de graptolites.

51

SOQU1P ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1320-1325 mkb: 85 % calcaire brun pâle à gris pâle à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux. à arénecé.

15 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle. à gris très pâle.

TR shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1325-1330 mkb: 91,5 % calcaire brun pâle à gris pâle à gris brunâtre, rarement brun foncé cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux, pyriteux.

7,5 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

1 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1330-1335 mkb: 85 % calcaire brun pâle à gris pâle à gris brunâtre, rarement brun foncé cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux, pyriteux.

10% calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé, parfois silteux, d'allure bitumineux, quelques surfaces lisses.

1335-1340 mkb 89 % calcaire brun pâle à brun moyen à gris pâle à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux, (calcilutite), présence de stylolites.

10 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle, parfois silteux (calcilutite).

1 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé, parfois silteux, d'allure bitumineux, quelques surfaces lisses.

52

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1340-1345 mkb: 95 % calcaire brun pâle à gris pâle à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osides de crinoides, trace de bitumes, parfois silteux. à arénecé.

5 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle. à gris très pâle.

1345-1350 mkb: 92,5 % calcaire brun pâle à gris pâle (surtout) à gris brunâtre, rarement brun foncé cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux à arénacé, pyriteux.

5 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

2,5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1350-1355 mkb: 91,5 % calcaire brun pâle à gris pâle (surtout) à gris brunâtre, rarement brun foncé cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux, pyriteux.

7,5% calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

1 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé, parfois silteux, d'allure bitumineux, quelques surfaces lisses.

1355-1360 mkb: 87,5 % calcaire brun pâle à brun moyen à gris pâle (surtout) à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, ostracodes, trace de bitumes, parfois silteux, (calcilutite), présence de stylolites.

10 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle, parfois silteux (calcilutite).

2,5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé, parfois silteux, d'allure bitumineux, quelques surfaces lisses.

53

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1360-1365 mkb: 84 % calcaire brun pâle à gris pâle à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux. à arénecé.

15 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle. â gris très pâle, parfois silteux à arénacé.

1 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1365-1370 mkb: 87,5 % calcaire brun pâle à gris pâle (surtout) à gris brunâtre, rarement brun foncé cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux à arénacé, pyriteux.

10 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

2,5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1370-1375 mkb: 85 % calcaire brun pâle à gris pâle (surtout) à gris brunâtre, rarement brun foncé cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux, pyriteux.

15% calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

1375-1380 mkb: 84 % calcaire brun pâle à brun moyen à gris pâle (surtout) à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, ostracodes, trace de bitumes, parfois silteux, (calcilutite), présence de stylolites.

15 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle, parfois silteux (calcilutite), présence de stylolites.

1 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen â foncé, parfois silteux, d'allure bitumineux, quelques surfaces lisses.

54

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1380-1385 mkb: 82,5 % calcaire brun pâle à gris pâle à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux. à arénecé, présence de stylolites.

15 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle. à gris très pâle, parfois silteux à arénacé.

2,5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1385-1390 mkb: 77,5 % calcaire brun pâle à gris pâle (surtout) à gris brunâtre, rarement brun foncé cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux à arénacé, pyriteux.

20 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

2,5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1390-1395 mkb: 85 % calcaire brun pâle à gris pâle (surtout) à gris brunâtre, rarement brun foncé cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux, pyriteux.

10% calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

5 %

shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1395-1400 mkb: 82,5 % calcaire brun pâle à brun moyen à gris pâle (surtout) à gris brunâtre, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, ostracodes, trace de bitumes, parfois silteux, (calcilutite), présence de stylolites.

15 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle, parfois silteux (calcilutite), présence de stylolites.

2,5 % shale noir, peu ou pas calcaireux, laminé, parfois

55

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

brunâtre, rayable, rarement gris moyen à foncé,

1400-1405 mkb: 90 % calcaire brun pâle à gris pâle à gris brunâtre, plutôt brun à brun foncé, argileux à très argileux, cristallin, (sucrosique), en partie recristallisé, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux. à arénecé, présence de stylolites.

5 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle. à gris très pâle, parfois silteux à arénacé.

5 % shale noir à gris brunâtre, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1405-1410 mkb: 84 % calcaire brun pâle à gris pâle (surtout) à gris brunâtre, parfois brun foncé,(5 %),argileux à très argileux, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux à arénacé, pyriteux.

15 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle.

1 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1410-1415 mkb: 85 % calcaire brun pâle à gris pâle (surtout) à gris brunâtre, parfois brun foncé, argileux à très argileux, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux, pyriteux.

10% calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle, silteux, (calcilutite)

5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1415-1420 mkb: 90 % calcaire brun pâle à brun moyen à gris pâle à gris brunâtre, parfois brun foncé,.très argileux cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, ostracodes, trace de bitumes, parfois silteux à arénacé (calcilutite,

56

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

calcarénite), pyriteux. 10 % calcaire blanc, partiellement recristallisé, friable,

microcristallin, parfois brun très pâle. à gris très pâle, parfois silteux à arénacé, présence de brachiopodes.

1420-1425 mkb: 87,5 % calcaire brun pâle à gris pâle à gris brunâtre, plutôt brun à brun foncé, argileux à très argileux, cristallin, (sucrosique), en partie recristallisé, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux. à arénecé, présence de stylolites.

10 % calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle. à gris très pâle, parfois silteux à arénacé, présence de brachiopodes.

2,5 % shale noir à gris brunâtre, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1425-1430 mkb: 90 % calcaire brun pâle à gris pâle à gris brunâtre, parfois brun foncé, argileux à très argileux, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux à arénacé, pyriteux.

5 % calcaire blanc, partiellement recristallisé, friable, microcristallin., parfois brun très pâle.

5 % shale noir, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1430-1435 mkb: 42,5 % calcaire blanc à blanc "os", légèrement brunâtre, localement fossilifère, crytocristallin à microcristallin, légèrement dolomitique, (mudstone)

30 % dolomie blanche à gris très clair, finement cristalline, texture granuleuse, (sucrosique).

2,5 % calcaire brun pâle à gris pâle (surtout) à gris brunâtre, parfois brun foncé, argileux à très argileux, cristallin, (sucrosique), en partie recristallisé, argileux, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux, pyriteux.

2,5% calcaire blanc, partiellement recristallisé, friable, microcristallin, parfois brun très pâle, silteux, (calcilutite).

57

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1435-1440 mkb: 60 % calcaire blanc à blanc "os", légèrement brunâtre, localement fossilifère, crytocristallin à microcristallin, légèrement dolomitique, (mudstone).

30 % dolomie blanche à gris très clair, finement cristalline, texture granuleuse, (sucrosique).

5 % calcaire brun pâle à gris pâle à gris brunâtre, plutôt brun à brun foncé, argileux à très argileux, cristallin, (sucrosique), en partie recristallisé, avec fragment de fossiles, osicles de crinoides, trace de bitumes, parfois silteux. à arénecé, présence de stylolites.

5 % shale noir à gris brunâtre, peu ou pas calcaireux, laminé, parfois brunâtre, rayable, rarement gris moyen à foncé,

1440-1445 mkb: 80 % dolomie blanche à gris verdâtre clair, finement cristalline, texture granuleuse, (sucrosique), silteux à grèseux, (dolosiltite à dolorénite), localement verdâtre, parfois oxydé, (couleur rouille très clair).

20 % calcaire blanc à blanc "os", légèrement brunâtre, localement fossilifère, crytocristallin à microcristallin, légèrement dolomitique, (mudstone).

1445-1450 mkb: 70 % calcaire blanc à blanc "os", légèrement brunâtre, localement fossilifère, crytocristallin à microcristallin, légèrement dolomitique, (mudstone).

30 % dolomie blanche à gris verdâtre clair, finement cristalline, texture granuleuse, (sucrosique), silteux à gréseux, (dolosiltite à dolorénite), localement verdâtre, parfois oxydé, (couleur rouille très clair).

carotte 1454-1463_ mkb carotte no-3: 1454-1457.5 mkb carotte_ no-4: 1457.5-1463 mkb

1460-1465 mkb: 20 % calcaire blanc à blanc "os", légèrement brunâtre, localement fossilifère, crytocristallin à microcristallin, légèrement dolomitique, (mudstone),et parfois calcaire brun pâle à gris pâle (surtout) à gris brunâtre, parfois brun foncé, argileux à très argileux, cristallin,

58

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

80 % dolomie blanche à gris très clair même bleuté, finement cristalline, texture granuleuse, (sucrosique), recristallisée par endroit

1465-1470 mkb: 45 % calcaire blanc, brun pâle à brun moyen, microcristallin, légèrement argileux à très argileux, parfois silteux (calcilutite), légèrement dolomitique.

40 % dolomie gris à gris bleuté, sucrosique à très fine, légèrement argileuse, parfois silteuse (dolosiltite), à dolorénite, grains grossiers, sub-arrondis, tri bon, flottent dans la pâte, quartz translucide.

15 % calcaire brun foncé, dolomitique, parfois silteux, à des allure de shale très calcaireux.

1470-1475 mkb: 70 % dolomie gris très pâle à gris bleuté, sucrosique à très fine, légèrement argileuse, parfois silteuse (dolosiltite),

25 % calcaire blanc, brun pâle à brun moyen, microcristallin, légèrement argileux à très argileux, parfois silteux (calcilutite), légèrement dolomitique, allure d'un mudstone.

5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1475-1480 mkb: 70 % calcaire blanc, brun pâle à brun moyen, microcristallin, légèrement argileux à très argileux, parfois silteux (calcilutite), légèrement dolomitique, allure d'un mudstone.

30 % dolomie gris très pâle â gris bleuté, sucrosique à très fine, légèrement argileuse, parfois silteuse (dolosiltite).

note; échantillon peu représentatif.

carotte 1486-1496,5 mkb carotte no-5: 1486-1496,5 mkb

1495-1500 mkb: 20 % calcaire blanc à gris brun clair, parfois brun pâle, parfois silteux, texture microcristalline, parfois mudstone, fossilifère, forme ronde à ovale , recristallisé, légèrement dolomitique.

80 % dolomie blanche à gris pâle, rarement gris moyen, texture sucrosique argileux , très silteuse, à gréseuse,

59

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

(dolosiltite à dolorénite), très argileux par endroit.

1500-1505 mkb: 70 % dolomie blanche à gris pâle, rarement gris moyen, texture sucrosique argileux , très silteuse, à grèseuse,(dolosiltite à dolorénite), très argileux par endroit.

25 % calcaire blanc à gris brun clair, parfois brun pâle, très silteux, (calcilutite) texture microcristalline, parfois mudstone, fossilifère, forme ronde à ovale , recristallisé, légèrement dolomitique

5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1505-1510 mkb: 80 % calcaire blanc à gris brun clair, parfois brun pâle, très silteux, (calcilutite) texture microcristalline, parfois mudstone, fossilifère, forme ronde à ovale , recristallisé, légèrement dolomitique, argileux à très argileux.

20 % dolomie blanche à gris pâle, rarement gris moyen, texture sucrosique argileux , très silteuse, à grèseuse,(dolosiltite à dolorénite), très argileux par endroit.

carotte 1514-1540 mkb carotte no-6; 1514-1524 5 mkb carotte no-7; 1524,5-1535 mkb carotte no-8; 1535-1540 mkb

1540-1545 mkb: 80 % calcaire brun très pâle à brun pâle, texture sucrosique, peut-être légèrement argileux, à l'occasion fossilifère mais complètement recristallisé, parfois un mudstone, présence de stylolite, légèrement dolomitique.

20 % dolomie blanche gris très pâle à gris bleuté, moyennement à finement cristalline, texture granulaire, peut-être légèrement argileux, homogène, à ciment parfois calcaireux, surtout silteux, (dolosiltite à dolorénite).

1545-1550 mkb: 62,5 % dolomie blanche gris très pâle à gris bleuté, parfois légèrement verdâtre moyennement à finement cristalline, texture granulaire, peut-être légèrement argileux, homogène, à ciment parfois calcaireux, surtout silteux,

60

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

(dolosiltite à dolorénite). 35 % calcaire brun très pâle à brun pâle, texture sucrosique,

peut-être légèrement argileux, à l'occasion fossilifère mais complètement recristallisé, parfois un mudstone, présence de stylolite.

2,5 % shale gris foncé à noir.

1550-1555 mkb: 80 % calcaire brun très pâle à brun pâle, texture sucrosique, peut-être légèrement argileux, à l'occasion fossilifère mais complètement recristallisé, parfois un mudstone, présence de stylolite, observation d'un bryozoaire, parfois dolomitique.

17,5 % dolomie blanche gris très pâle à gris bleuté, moyennement à finement cristalline, texture granulaire, peut-être légèrement argileux, homogène, à ciment parfois calcaireux, surtout silteux, (dolosiltite à dolorénite).

2,5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1555-1560 mkb: 85 % calcaire gris brun très pâle à moyen, parfois brun (10 %) texture sucrosique, peut-être légèrement argileux, à l'occasion fossilifère mais complètement recristallisé, pyriteux, parfois un mudstone, wackstone, calcilutite présence de stylolite, parfois dolomitique.

10 % dolomie blanche gris très pâle à gris bleuté, moyennement à finement cristalline, texture granulaire, peut-être légèrement argileux, homogène, à ciment parfois calcaireux, surtout silteux, (dolosiltite à dolorénite),

5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1560-1565 mkb: 100 % calcaire gris brun pâle à moyen, parfois brun (10 %) texture sucrosique, peut-être légèrement argileux, à l'occasion fossilifère mais complètement recristallisé, pyriteux, parfois un mudstone, wackstone, calcilutite présence de stylolite, parfois dolomitique.

1565-1570 mkb: 100 % calcaire gris brun à brun pâle à moyen, parfois brun (10 %) texture sucrosique, peut-être légèrement argileux, à l'occasion fossilifère mais complètement recristallisé, pyriteux, parfois un mudstone, wackstone, calcilutite

61

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

présence de stylolite, parfois dolomitique.

1570-1575 mkb: 99 % calcaire gris brun pâle à moyen, parfois brun (25 %) texture sucrosique, argileux, à l'occasion fossilifère mais complètement recristallisé, pyriteux, parfois un mudstone, wackstone, calcilutite présence de stylolite, parfois dolomitique, pyriteux.

1 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1575-1580 mkb: 97,5 % calcaire gris brun pâle à moyen, parfois brun (10 %) texture sucrosique, argileux, à l'occasion fossilifère mais complètement recristallisé, pyriteux, parfois un mudstone, wackstone, caicilutite présence de stylolite, parfois dolomitique, pyriteux.

2,5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1580-1585 mkb: 99 % calcaire gris brun pâle à moyen, parfois brun (20 %) texture sucrosique, argileux, à l'occasion fossilifère mais complètement recristallisé, pyriteux, parfois un mudstone, wackstone, calcilutite présence de stylolite, parfois dolomitique.

1 % shale noir à brun foncé, peu ou pas calcaireux, !aminé.

1585-1590 mkb: 95 % calcaire gris brun â brun pâle (20 %) à moyen,surtout brun (80 %) texture cryptocristalline à microcristalline, argileux à très argileux, à l'occasion fossilifère mais complètement recristallisé, pyriteux, un mudstone, parfois un wackstone, calcilutite

5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1590-1595 mkb: 92,5 % calcaire gris brun à brun pâle (15 %) à moyen,surtout brun texture cryptocristalline à microcristalline, argileux à très argileux, à l'occasion fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite

7,5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1595-1600 mkb: 97,5 % calcaire gris brun à brun pâle (15 %) à moyen,surtout brun texture cryptocristalline à microcristalline, argileux à très argileux, à l'occasion fossilifère, peu recristallisé

62

1615-1620

1620-1625

7,5 %

mkb: 90 %

10 %

mkb: 95 %

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite

2,5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1600-1605 mkb: 95 % calcaire gris brun à brun pâle (20 %) à moyen,surtout brun texture cryptocristalline à microcristalline, argileux à très argileux, à l'occasi'on fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite

5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1605-1610 mkb: 95 % calcaire gris brun à brun pâle (30 %) à moyen,surtout brun texture cryptocristalline à microcristalline, argileux à très argileux, à l'occasion fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite

5% shale noir à brun foncé, peu ou pas calcaireux, laminé.

1610-1615 mkb: 92,5 % calcaire gris brun à brun pâle (15 %) à moyen,surtout brun texture cryptocristalline à microcristalline, argileux à très argileux, à l'occasion fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite

shale noir à brun foncé, peu ou pas calcaireux, laminé.

calcaire gris brun à brun pâle (15 %) à moyen,surtout brun (85 %) texture cryptocristalline à microcristalline, argileux à très argileux, à l'occasion fossilifère mais complètement recristallisé, pyriteux, un mudstone, parfois un wackstone, calcilutite shale noir à brun foncé, peu ou pas calcaireux, laminé.

calcaire gris brun à brun pâle (35 %) à moyen,surtout brun texture cryptocristalline à microcristalline, argileux à très argileux, à l'occasion fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite

5 % shale noir à brun foncé, peu ou pas calcaireux, laminé,

pyriteux. 63

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1625-1630 mkb: 100 % calcaire blanc, gris brun à brun pâle (40 %) à moyen, surtout brun texture cryptocristalline à microcristalline, argileux à très argileux, à l'occasion fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite

TR shale noir à brun foncé, peu ou pas calcaireux, laminé.

1630-1635 mkb: 97,5 % calcaire blanc à gris brun pâle, rarement brun texture cryptocristalline à microcristalline,légèrement argileux, à l'occasion fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite.

2,5 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1635-1640 mkb: 99 % calcaire blanc à gris brun pâle, texture cryptocristalline à microcristalline, argileux, à l'occasion fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite, légèrement dolomitique.

1 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1640-1645 mkb: 99 % calcaire blanc à gris brun pâle,rarement brun, texture cryptocristalline à microcristalline, argileux, à l'occasion fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite, légèrement dolomitique.

1 % shale noir à brun foncé, peu ou pas calcaireux, laminé.

1645-1650 mkb: 100 % calcaire blanc à gris brunâtre, à brun pâle,rarement brun, texture cryptocristalline à microcristalline, argileux, fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite, légèrement dolomitique.

1650-1655 mkb: 100 % calcaire blanc à gris brunâtre, à brun pâle,rarement brun, texture cryptocristalline à microcristalline, argileux,

64

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

argileux, fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite, légèrement dolomitique.

1655-1660 mkb: 100 % calcaire blanc à gris brunâtre, à brun pâle,rarement brun, texture cryptocristalline à microcristalline, argileux, fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite, légèrement dolomitique, trace de bitume.

1660-1665 mkb: 100 % calcaire brun pâle à blanc, rarement brun texture cryptocristalline à microcristalline,légèrement argileux, fossilifère, abondance de peltoides, recristallisé, pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite, quelques calcarénites, grains flottent dans la pâte, quartz translucides, sub-arrondis.

1665-1670 mkb: 65 % dolomie gris à gris bleuté, parfois plus foncé, argileux â très argileux, microcristallin à texture sucrosique, silteux à l'occasion (dolosikite), rarement dolorénite.

35 % calcaire brun pâle à blanc, rarement brun texture cryptocristalline à microcristalline,légèrement argileux, fossilifère, abondance de peltoides, recristallisé, pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite, quelques calcarénites, grains flottent dans la pâte, quartz translucides, sub-arrondis.

TR shale noir à brun foncé, peu ou pas calcaireux, laminé.

carotte 1672-1687125 mkb carotte no-9: 1672,0-1,674,70 mkb carotte no-10: 167470-1687,25 mkb

1685-1690 mkb: 2,5 % calcaire blanc à gris brun pâle,rarement brun, texture cryptocristalline à microcristalline, argileux, â l'occasion fossilifère, peu recristallisé, observation de brachiopodes pyriteux, un mudstone, parfois un wackstone, calcilutite, présence de stylolite, légèrement dolomitique.

65

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

20 % dolomie blanche à gris très pâle, parfois brunâtre, rarement bleuté, microcristallin, aspect granulaire, texture sucrosique, légèrement argileux, calcaireux, présence de stylolites.

75 % grès dolomitique, blanc â gris très pâle, rarement bleuté, grains fins à moyens, tri moyen, sub-arrondis, ciment dolomitique, pyriteux.

2,5 % shale noir, laminé, légèrement calcaireux.

1690-1695 mkb: 99 % dolomie blanche à gris très pâle, parfois brunâtre, rarement bleuté, riche en bitume, microcristallin, aspect granulaire, texture sucrosique, légèrement argileux, calcaireux, présence de stylolites, trace de grès dolomitique.

1 % shale noir, laminé, légèrement calcaireux.

1695-1700 mkb: 100 % dolomie blanche à gris très pâle, parfois brunâtre, rarement bleuté, riche en bitume, microcristallin, aspect granulaire, texture sucrosique, légèrement argileux, calcaireux, présence de stylolites, trace de grès dolomitique.

1700-1705 mkb: 100 % dolomie blanche à gris très pâle, parfois brunâtre, rarement bleuté, riche en bitume, microcristallin, aspect granulaire, texture sucrosique, légèrement argileux, calcaireux, présence de stylolites, trace de grès dolomitique.

1705-1710 mkb: 100 % dolomie gris très pâle à gris,rarement verdâtre à rosé, microcristallin à cryptocristallin, aspect granulaire, texture sucrosique, d'allure d'un mudstone, légèrement argileux, calcaireux, présence de stylolites, trace de grès dolomitique.

1710-1715 mkb: 100 % dolomie gris très pâle à gris moyen, microcristallin à cryptocristallin, aspect granulaire, texture sucrosique, d'allure d'un mudstone, légèrement argileux, calcaireux, présence de stylolites, trace de grès dolomitique.

66

SOQUIP ST-FLAVIEN NO 8 DESCRIPTION LITHOLOGIQUE

1715-1717 mkb: Fin du puits SOQUIP St-Flavien no-8

67

SOQUIP ST-FLAVIEN NO 8

DESCRIPTION DES CAROTTES

Lk

SOQUIP ST-FLAVIEN NO 8

Roche couverture:

carotte no-1; 1189,00-1192,25 mkb carotte no-2; 1192,25-1195.00 mkb

Formation de Québec City

carotte no-3; 1454,00-1457,50 mkb carotte no-4; 1457,50-1463,00 mkb

Formation de Beekmantown

RéservQir " H " drilling break:

carotte no-5; 1486,00-1496,50 mkb

Formation de Beekmantown

Réservoir Dolomie " B ";

carotte no-6; 1514,00-1524,50 mkb carotte no-7; 1524,50-1535,00 mkb carotte no-8; 1535,00-1540,00 mkb

Formation de Beekmantown

Dolomie " C ";

carotte no-9; 1672,00-1674,70 mkb carotte no-10; 1674,70-1687,02 mkb

Formation de Beekmantown

~~~"?'?6?--V•r`st>

.11. i. ~.i.

......+:~.~

.t.i...t,1~~~1'

~ ~ ~ ~

fssssssssssasssa

Fe

a

Ch

r

-1

SOQUIP St-Flovien No-8 (carottage)

Légende

GRAIN SIZE BMPB IEOI OTRT TROU

SANDSILT

UESM RSIE

ÎÎÎÎ1 1 CLAY R Ÿ N

— Shale

Grès

Calcaire

Dolomie

Calcaire dolomitique

Dolomie calcaireuse

Dolomie cherteuse

Perte de carotte (non-récupérée)

Zone bréchique

Contact graduel

Contact bioturbé

Contact d'érosion

Fractures

Stylolites

lits obliques

• Oxydé Pyriteux

Dolomitique

Calcaireux

Argileux

SiReux

Gréseux

Cherteux

Porosité excellente

Porosité bonne

Porosité moyenne

Porosité pauvre

aucune porosité

GRAIN SIZE

f SAND

B MPB IEOI O TRT TROU U ESM RSIE B TN

Y cmfv

SILT

1111 CLAY

= _ ;

--- __ ' ~_ ---

_-_--_-3 ~~. _ ~~_ _

_ •r ' >z =_�__

7 vAy ^-

5te_ =—...—...11'. iJ ' V JJ '.7

a_= __ ~lJa -,-.... > V . h'_-_-__-__-_-_-

~ .

/r

*a

g..

â----- ~

►-------- r

Ç_ -_-_-...4 -

1"

9 1

9 2

SOQUIP St-Flauien No-8 (carotte no-1)

1189-1192,25 mkb

— Début de la carotte no-1 (1189 mkb)

1189-1192,25 mkb course; 3,25 m récupération; 2,58 m pourcentage; 79 % RQD; 45 %

- Shale gris foncé à noir, litage à environ 45 degré, discontinu, plan de décollement associé au litage, surface lisse et parfois srtié, un minimum de trois systèmes de fractures, litage d'épaisseur variable, 1-10 cm, calcaireux, parfois peu calcaireux.

calcaire plutôt argileux, mince (5mm-10mm), limites irrégulières,de couleur gris pâle à gris moyen.

Fractures sub-verticales, millimetriques à centi-metriques. colmatées, rarement poreuses, possi- bilité dr. re la chronologie des trois réseaux de fractures, ciment de calcite.

- Fin de la carotte récupérée 1191,50 mkb

- Fin de la carotte no-1 (1192.25 mkb)

— Début de la carotte no-2 (1192,25 mkb)

1192,25-1195 mkb course; 2,75 m récupération; 2,4 m pourcentage; 87 % ROD; 50,5%

- shale gris moyen à gris foncé,(peu cal-caireux à calcaireux), parfois noir, (cal-caireux), litage irrégulier et très dé-formé,tectonisé, intraclaste de shale noir, litage à environ 45 degré, discontinu,plan de décollement associé au litage, surface lisse (mirroir), parfois strié, plusieurs systèmes de fractures, (3).

calcaire, gris pâle à gris moyen, argileux, litage très mince et fortement déformé, (1 mm-10mm).

fractures sub-verticales, millimétriques à centi-métriques, colmatées, rarement poreuses, ciment de calcite.

- Fin de la carotte récupérée 1194,65 mkb

- Fin de la carotte no-2 (1195,0 mkb)

1 i g 3

1 9 4

1 1 9 5

SOQUIP St-Flauien No-8 (carotte no-2)

1192,25-1195 mkb

GRAIN SIZE

SAND

cmfv SILT

11z~1 1 CLAY

B MPB IEOI O TRT TROU U ESM RSIE B TN

Y

a- -.~• L ---

.3a----_ .r.46

=_ --- _

a- _--_-=_ =____~•

=_ r - _-_-__-_-_-_-_-_-

'SC=-- .ri`'

g - - - -

_ _ _- _

c

; ---_"Pl' •

5; .

//~~ (1.11,113 ~

'

~~~~~

S ~

SUQUIP St-Flauien No-8 (carotte no-3)

1454-1457,5 mkb

GRAIN SIZE

cmfv[~ I1E11 f CLAY pFe,

B MPB IEOI O TRT TROU U ESM RSIE B TN

X — Début de la carotte no-3 (1454 mkb)

SAND SILT

-1 4 5 5

'1 ,4 5 6

4 5 7

1454-1457,5 mkb course; 35 m récupération; 3,1 m pourcentage; 89 % RQD; 51%

Dolomie gris à gris verdâtre, quelques niveaux oxydés, litage de 1-10cm, contact irrégulier, parfois bioturbée, légèrement si Ceux (dolosiltite), peu argileux, texture sucrosique.

Calcaire gris pâle, litage de 1-10cm, contact graduelle à franc, quelques contacts d'érosion, très stylolisé (0,5-1 mm), concentré par endroit légèrement dolomitique, rarement bioturbé, aucun fossile.

Fractures colmatées, (0,5-5mm), rarement poreux, présence d'un vug (1455,8 mkb) 1 mm-1 mm-1 mm , verticaux à sub-verticaux, à 1455,7 mkb, fracture avec déplacement, (micro-faille) car déplacement du litage,

Fin de la carotte récupérée 1457,5 mkb

- Fin de la carotte no-3 (1457,5 mkb)

~~f~~~l~n irriasn~~~~f~

l~~lltlll,

SOQUIP St-Flauien No-8 (carotte no-4)SOQUIP St-Flauien No-8 (carotte no-4)

1457,5-1463 mkb

GRAIN SIZE

SAND

cmf r SILT

VIII { cLAY

B MPB IEOI O TRT TROU U ESM RSIE B T N

Y

- Début de la carotte no-4 (1457,5 mkb)

1457,5-1463 mkb course; 5,5 m récupération; 5,5 m pourcentage. 100 % RQD; 88,9 %

Dolomie gris verdâtre avec intraclaste de litage, litage, 10mm et moins, parfois calcaireux

Calcaire gris à gris brunâtre en cassure fraiche, très stylolisé, texture sucrosique, semble être un banc massif, présence d'une fracture très fine 0,05mm, colmatée avec de la calcite.

- Dolomie calcaireuse, banc massif, semble silteux, (dolosiltite), fractures irrégulières colmatées.

- Zone de fractures poreux par endroit,

dégazement sur la carotte 1459,4-1460,25 mkb trois zones de dégazement:

- fractures poreuses (vugs) - quelques stylolites - zones irrégulières dolomotiques recristallisées (gris foncé) à 1459,8-1460,1 mkb, contour

irrégulier dégazement sur 2 heures, sifflement, pétillement, en présence d'eau, bouillonnement, peu perméable

Dolomie calcaireuse, gris pâle à gris moyen, banc massif, semble silteuse, quelques fractures, colmatées,irrégilières à sub-verticales,

.------ Men MIE =-- VIS ----..---..--- -- --

Mn — -----_- •------------ ~----:—~—I=MI.

=

MI--

OFW__a_aa==— ----ar—arar--- ____arar===__ IIM---a------a=- ~__-•__—_______ --ar—arar—arar---aa

a__aa_====_ --ar—ar----ss—

_a____:____ iftr—sa-------- ~ atentalardWaNiirmorawramramar

~--III•------ar—s— •_a=___—_____ ------aar------

~_______a== --ar-ar--ara ______a__ 1 -------a—ar--

'___________ --a----ar—aras-- __=====s===

~ ------a---- _______==a=

•__m____ ---------ar--

_____—___ ~ ar---a-a----

r= at_____a__== a.------a-----,—

•_____________ --ar------ar---a

ZZ6dra______a ----a—aarar

1

2

— Calcaire gris foncé à noir, litage irrégulier, lithoclaste de litage, interlits de 10mm à 40mm, parfois litage boudiné, argileux à très argileux, présence de surface d'érosion, microfractures, colmatées, irrégulières à sub-verticales.

Dolomie blanche à gris pâle, calcaireux, banc massif, très fracturés, irrégulières à sub-verticales, colmatées, rarement poreux.

Fin de la catotte no-4 (1463,0 mkb)

'1 4, 8 8

9

.0

SOQUIP St-Flauien no-8 (cototte no-5)

1486-1496,5 mkb

GRAIN SIZE

SILT cri v 1 1 1 r— CLAY

B MPB IEOI O TRT TROU U ESM R S I E B T N

Y Début de la carotte no-5 (1486 mkb)

1486-1496,5 mkb course; 10,5 m récupération; 10,5 m pourcentage; 100 %

`RQD; 97,6%

Calcaire blanc à gris pâle, légèrement dolomitique, très stylolisé, texture sucrosique,

Fractures; profondeur ouverture 1486 mkb 10mm 1486,2 mit 8mm 1486,5 mkb 11 mm

toutes colmatées, sub-verticales, calcite, fractures semblent synsédimentaires?

Fractures; profondeur ouverture 1488,85 mkb 8mm 1489,45 nb 5mm

toutes colmatées, calcite,

1489-1491 mkb;

Dégazement sur microfractures ouvertes, (0,001 mm?) distribution irrégulière avec un axe plus ou moins sub-verticale, dégazement sur près de deux heures, faible perméabilité, (sifflement et bouillonnement en présence d'eau), voir sur le vidéo de Yves Duchaine

note; odeur pétrolifère en cassure fraiche

1 8 7

1487,12-1492,27 mkb; Dolomie peu calcaireuse à calcaireuse, gris à gris clair, très silteuse, (dolosittite) à grèseuse, (dolorénite), les grains ne se supportent pas, (flottent dans la pâte), beaucoup de microfractures colmatées, calcite, quelques lits de shale, finement laminé, (1mm à 3mm), quelques stylolites,

651 rtSf r~ , .,, __

~' ~wwn 1J~irJiri~~ .w --- --- — ,- w- w-www-

2P271i ----------- ____—=====a

feefla ~~~~~~~~a

JlirlrlllltirlM Jlff~f~,rams _--~---..—~.. ____—_____. ...........

off r;« A

1'~~~~~~~ ~J~~~~llf'

z ~, f„~JTr~ r/~r/~i ___________. ------- _====A w-arr — ~~ a

~

t&%%mr ~ ~airNr, ~w------ E3

~r .w-----~ - - -- —

~~CCIMM., _--

- Me MM --w --w 1—w ----- MM

wr.--ww

rl,1h„t'n

..".."

~

ff~~~~~~f~~ _-_..~-___. llllll~l~1E~

__--.M,

--------M mir--------- OP •

x. «ex r.7"—

a—as—a MAIN ar—f —aaallas—aa

•—fsf---a—aaaa aasaaaaaaa

iliMeirairarrw asaaaasaaas

—aa—aaa IN, sff !—aaaaasaaa—aa

fAf—sffa—aa sasaa Air a—aa

.af fAffffs =ri ff ~s—aaaa-- Jar Mir a Afaaaaaaawrsar ~asa—a—a AM, —a

ssAfAffsss—s laasaaasa—assa rfa Mir fAfAfAfAff Mir fff ! IOWA. afaaaa—aAfaa rAfAfaa—aaffarAfaf lsaa--aa--aasa

sfsas—f—Afs— —aasa—asaa

artaraaraaaAfAfAf aa—aaaaa—aa

ararsAfAfsaasaa !—asaaaaaaasaa fi. Af ~AM aaafAfaAfAfAf

aaaaaaa—aa afaaa~aarff sasaaaaaaa

— arararffssssara aaaaaaaasaa

: Afaaaa—fssafa—f —aasas—aaaaaaa sarsssssarsafsarar

=ri ma, —sffaafAfff asaaasa

— ararffararaar ry /y /r~ aaaalasa ~ W 1~ ~•

'---ariaraararf • lasaa /NP saaaaaaa rsfsssfs—ararssa lsaasasasssss—

ffAfAfaarf Mn- affala. aaaa-- Mir aaf

—asasssa ' aaAfaaasa i~i_~_l~i. rsf—sf—sfsAf

lasaaasaaaa raarfsfaar—f—AfAfs Aaaaaaa—aasasa

jogrxaaaalfffAfaf aaaa—sasaa

_ sararfarfaraarAfa saasaaaaaaa

faaaaa AM, Afsf ! rararailfaraar—araraa40. lasaaaaasa—aaa VIMIlafAfafAfAfAf AM- af

EL—ff—ffAf assaaaa ~~;

— aaAfaaffa aaaaaaaaaaa

ra--fafsa—af-- W. faasafaaaf

aaaaa.illasa 4 OMM aa MISE w IM. i—i— lasiaraaaaaaa I------ — — ---a —a -- — ---- 1 M aaaaa aa !aa s a aaaa rasaaaa—iasaa IMwa—aaaaasaas rsa 1/8 NP i iaaaaaa SIaa aaaaa aaiia laaaa a — aaaaaa r !aa aaa a a a la aaaa aasa aaaaar raa Is sawii—aaaa a laaaaa a a a a saw !Ma= a a aaaa ara IR i Mal saaalin iaia \a saa — aaaaaaa a s laaa a a a

I—iaa a aaa— SMiaasaaaa lasaa MW= aaiaaa nana aaaaaaa rawaaaaaaIN. a a a Ina—a=MM aa—aia 1—a lin aaaaaaaaa

iririsaaaaaaaa

~ asaa Man lia aa iaa------ a aaaa--ai

-a aaaa aaasi aa I------- =Ma -- aa -----aa asaa aiaia

aaaa MIN aaaa raaaasaaaaaaa INaa— s aaa lin aaas liaaaaaawiasa

NOaaaaas lin aa --------- --------- Oaaa MM, aaas s—a

ra Man lin aaaaasaa all Mal aaaaaaaaa OINC

aaaa— ii ii aaaaaaaaar

laaaaalrÂ~a~i~a~ laaaaaaaaa—ar

al iaaraaa-- ■ iaaaaaaa!

aaas aaaa— In ana iasaa lain Milan a r—aaaaa—aaaa— 'IM aiaaaiaaaaaa

aaasasa Mal Ill —aiaa aaasa

a aaasiaaa aaaaaawwa

aaaaaaaaa nana aa Ban aaaaaa aa— muni aasa MM, a saw—iasasa—aa

a MENUE aw MINI w raaaa Nil aaa aaaaaaaaa

anal waa— ail a aa—aaassa aa---awaw

aaa Waal. aaa laaaaaaaaaaaa laaawiaia lin aaa

a =Man aMIEN alla saaaaa ~]

s Man sa — Mal Mal OMM a

la MM= aaaa Mil a lin a laaawsaaaa Mal a liniffliraa

aaasaaaaa Mal —aaaaa

!aa— Ma= =OP —aia raasa Mal —aaa laaiasaaaa

—----- aassaa -- —aaaa--

-

---a---- -- ----------r aiasswwii—aa—

laaaaaaaasaaa l =flan asaaa—aaa Illiniraaaaaa uni ii

a air wa--a—a r NOM aa =MM aii MME a

a~

a a aaaaaaaii aaaaiaa wiaa--aaa ssaaaaaas

Waaiaawaa—aai .110 MIaaaa—iiaMM=

_____a___ " aaaaaaaaa —iaasaaaalin

—iaa mail Mir aia -a =MI MISE aaarAri— liaaaaa ai= —a-- ilmaw—aaaiMale ---------

----a---- -aaa MME saMIME a a =MIN aaaaaaa

- --------- - .. ,. aa MI_ iaaaa OMM aaaaaaa

laaaa Mil aa MME asa MM-----aaaa Mir —

]

a

1 .4 9 .1

•4.

-2

'1 9. 3

- Shale finement laminé, surface lustré en contact avec la dolomie silteuse à calcaireuse.

- Calcaire gris à gris brunâtre, litage irrégulier, très stylolisé, interlités de shale très fin (0,5mm), par-fois recristallisé.

- Calcaire identique sauf présence de silt et de grès (calcilutite à calcarénite).

Plusieurs fractures sub-verticales à irrégulières, colmatées, (0,1 mm)

•1 4 9 4

'1 .4 9• •5

- 1493,3-1494,6 mkb; Fracture'de 27mm d'ouverture, colmatées de calcite et de dolomie, aucun déplacement vertical, fracture de tension?,

- 1496-1496,5 mkb; Calcaire dolomitique, gris foncé à moyen, nodule de dolomie, (2mm), peut-être des intraclaste de dolomie, quelques surfaces d'érosion.

•1 •9. .6

Fin de la carotte no-5 (1496,5 mkb)

11111111111

r

.5,

S

/Arff, ..........

TA=

~

1111./111LsfkMsss 110ssssassylr

i_t r r r t r r r 7 7 r

~~-

SOQUIP St-Flauien no-8 (carotte no-6)

1514-15245 mkb

GRAIN SIZE

r-- SAND

cmfv~~ SILT 11111 1 CLAY

B MPB IEOI O TRT TROU U ESM RSIE B TN

Y Début de la carotte no-6 (1514 mkb)

V, VV~ 7VVVV V V.V

W:

• 1 5. 1 8

- 1514-1524,5 mkb course; 10,5 m récupération; 10,24 m pourcentage; 97,5 ROD; 85,1 %

1514-1515,75 mkb Calcaire très dolomitisé, gris pâle à gris moyen, parfois gris foncé, brunâtre en cassure fraiche, litage plus ou moins défini, plusieurs poches dolomitiques de forme irrégulière, contact basal par un stylolite?.

1514-1415,7 mkb fissure de dessiccation?, 8mm d'ouverture, colmatée de calcite, aucun déplacement, non-poreux, sub-verticale.

Plusieurs fractures, ouverture très fine, colmatée de calcite, irrégulière à sub-verticale.

1515-1517,2 mkb Dégazement sur microfractures, sifflement, pétillement, bouillonnement en présence d'eau.

Possibilité de dégazement de la matrice par endroit?

Dolomie parfois calcaireuse, finement laminée, alternance de bande blanche à brun clair, à gris pâle.

Plusieurs fractures sub-verticales (20 degré), ouverture très fine, colmatées, en relation avec le flanc de la structure.

- 1516,77 à 1516,795 mkb Shale dolomitique?, finement laminé, gris foncé à gris verdâtre, très pyriteux, déformé par une fissure, contact d'érosion.

Dolomie gris verdâtre à vert, semble être un calcaire recristallisé, aspect cherteux, (mudstone), très stylolisée? ou tapis d'algue.

1515,6-1517,3 mkb Fissure de dessiccation, verticale à sub-verticale, ouverture de 2mm à16mm, colmatée de calcite et de dolomie, parfois poreux, (vugs).

L'ensemble de cette section est très microfracturé, faible déplacement du litage, plus ou moins poreux à faiblement poreux.

1517,3-1517,87 mkb Calcaire gris pâle à gris moyen, légèrement dolomitique,

5

5

6

7

,.---sass-- ----=—airwr-- ---rr--a---

r =— r~—i~=~aw~=~=~=s - =111111=—lll===—=—

4r

--a--l—a~a~— — ------rra--- r—a.ar--=--=aerr—= - N— ras,.

r== rra=—=ar=rra=

S SSOS s SSS 5555

=— .r— ---SSS

s

ssssssssssssssssssssSied tla"- fif035lsls3sYffs'SfsfS

sa ssshtsi:f:s#s#si<sMAi

sssif ~s~siis s's~ssfs! ---------f --

--- --- ---- =LU MM MM ,M

----- — ,---=-----.:r:—. ssssssssssss

16igisisls3s3s3s3s3sls'sl5t 3'sssssssfs:sls3sasi*s'sss fs

»j eiC!-) ;

~~ ~s s sisl<~~~ss s

s5 -4-71 -WWs Wrtslsdsls3s#sks3s3s`s!s

=----..---- MD Mi-MS -----..— ---rr.-----

,.I..---SMI--- MIS MIS — ----rr OMM MME —a■-- •-- ....-- sssss ssssssss

sssssssssssssssssssssssss

U;s~s ~s}si~sssss 45 S s s

;i71-asJs3s3s3slcskiss'ss'si

~-------- — — --------- ---------- MM_ ----MM= ----- s s s s 5s $ t

s

'ititititit$tiMAit)

r==llaw-------- ~----------aa ---a----rr=— arsss--s--ss—

~—_____—_ =s=—l=---=all

..------ MME — ---------

,al--ssims—s— r=--

-s=s—=—=-- ---s--------- r--=—===—=a—=—

s----sa--rr _______rMf

•=—l==rr=--l= s--s—sass--

•la.l=a--u-- ---------- ------=a--

~

• _—__ ~—sa1r---a.a.---s— =s==========s

--====s==== --------ss

;IMMIMIMMIRMSMNIMIMILM• —lr— ` =—ar--

,.--wwws—a•—a! 7 : ---a--ur+rsssa—

rawl=—===r==sll Iffla a

_--aONw------

r=swwR=====_— ----.a-- ----=—=ir -----aV----

=ilia—A~r—=MK s=--rr-----

r====—=—=l~rrrr~r=

--~„r----- r= —=r=—=l,wir— IMM------N-11— r—==—SM_____—__

~—__ IPSO —_—_—der ..... __—_--

l—=rra--- 7 --rrr--=..=— ---ls---a.—N--

1 5

g

5 2 0

1 5 2 1

5 2

5 2 3 >

\._ L

s,yiouse.

1517,87-1518,46 mkb Calcaire gris interlité avec de fine lamination de dolomie verdâtre à vert.

1517,3-1521,2 mkb Peu ou pas de fractures (Microfractures)

1518,46-1520,90 mkb Calcaire gris pâle à gris moyen, parfois gris brunâtre, très fossilifère, bioturbé, parfois nodulaire, lithoclaste de mudstone gris pâle, pyriteux, dolomitique, quelques poches recristallisées en dolomie, présence de silt grossiers?

- 1521,3-1524,24 mkb Dégazement sur microfractures, sifflement, pétillement, bouillement en présence d'eau, odeur pétrolifère en cassure fraiche,

- 1520,90-1522,24 mkb Calcaire complètement recristallisé en dolomie, gris pâle â gris moyen, quelques stylolltes, bioturbé, présence de sill grossier à un grès très fin, ils se confondent avec les cristaux

~de dolomie.

1521,2-1523,0 mkb Microfractures, distribution irrégulière, semblent plus ou moins ouvertes, en général sub-verticales.

— 1523,8-1524,24 mkb Fracture, 2mm d'ouverture, colmatée.

- Fin de la carotte récupérée 1524,24 mkb

- Fin c e la carotte no-6 (1524,5 mkb)

rrrrrrrrrr r rs1N.srrr11rr1111•sr nrrrrrrrrrrrrr

MailiAN, rwsssssrs

rkrrrrrrrsrr 111,srsssssrrsrrs '4WrrrrrrrrrrrAlt rsrasssmirsssss ^rrarrrrrr.►srrr rrrsrrrrrarrrraw rrMUNI rrrrr ear Alf rrr MEW ssrsrrss

rrrrr,rrsr ~:ssssssrrrw rrrrr=rrrrr

AIN ssrr MN! rrss MINER srrrr Mr. rs

rs.rrsassss rr.rrr =rim rrrrWAN r!~

ss

r

s

r

s

s

s

=PAW r rrrr AMP ssss= rrrrrrrrs

MI MP rr

rr r,rsrrsr= a11111. 'rrrrrrOII.arrrrr rssrrr AIL rMAW IN,

ah. ~ i ~ i ~ ~ i~~ ~ =. i i i i~ i t

~sas=aJ.Jls=—aaaJ ---_-----=--=a .ssssssaass rMMMsa===ss= araa=aass—saa i~=sss:

0,=•A J •dif--_—_--_--~ aassasaassa

r=ssM=ew=ss== .saaaassaassssJ r—rr=--==------a —sasasassssasaJ ==s=s==s=s===a J.aassassasssasJ •_____________— .saaassss=ss r----=_--_-- ~=ss=s=== J

—_________~.. r : aasaasssa ssJ ewMMM=J.a=MMewa . r-----_—___—

-~—saaasswassa MMewsMssa.ew=ew

M=J.J.sJ.J.s=aaJ --------==AIra

'MewJr~MtJf~rl~.~Jrs =~~ a --------_-- -arrwaasaaaas ewsew=sMas=sew .saaaasassaasaJ rM=ewsew=s=s==Mara .assaasassaaaas —_----_—====sa ~sasssasaJ.

--------- .saaaaaaasas MsewMs==ssss .yrasssaaaaJ.saa. r—ewewrr~rsew.asss—sr

sassewsssaasJ sew=ewew====sewa

- r'----------_ . r=—ar=a=MewsMa IMMIEUewMewewewew=Mâ

J r=ewew=Mewss=ss=sa

M. rewsewsM—ssews—

assssasss ewMMMssssM ssJrsJ.J.J.sssJ.J

rew---ewM=s====Ma .J.J.assssssasssJ JewMewMewsMar=ewew=ewa .sasssasssss

sss==s=== ssasassss —MMsssss=

. J rM==sewM=ew====Ma wsaasssassssssJ rMM=ssss/Tr===s=a asaaaasassaaaaJ

gsew==ews=ewMMsa

wsassaswasaaJ sewM==ew=s=s=a aasaaaassaaJ =ssM===sMsa sssswaasasaJ

rsssewMM=sMsa=sa .saaaasaswssaaJ ews=====s=sMewsa

laaaasssaasJ ===ewMssew=ewsa

ssJ.J.sassssJ rMMewM=M=ss--ew=a

ewewewewewew=M ....sa sewsssM== J

rMMewewewewMaCMMMMMa M. s r==sa.sssssssa E/saassasass~i . J rMsar=sar—=s--=Ma rPswassssaaasssJ

ewMMsssssMssa =FAN" aMsass=a=

ew=s==ewsewew -J.J.sassaMMaa rM=sarasMssa= a .r=sssssassssss

MetaltIME ewewewew=sew=Mssa •

sewN.i=, ==sa . sa~asSsssasaJ r.rsarssssewsewsewsa

sa=sss=J~ M.rwawas

ewMMMewMMMMMa ! J rsewMM:ew=MMMewewewa

MMSMMMMMMasa J~ll

rasewewMMsew=M=~ rarewrrewMMMMSMM .sasssarsssas.Ms rewsew=s=ews=M=ew=a

~asssassss =

ssJ Mssassssssa

rewsews=ewewewMMM .aaJrrsssssssa rMMMsssewewss

ssssewarnrsaaaas rewewewewewrrs~M

=ara ssJ

=_ar

SOQUIP St-Flauien no-8 (carotte no-7)

1524,5-1535,0 mkb

GRAIN SIZE

cmf~

SAND SILT

Illll 7-CLAY

B MPB IEOI O TRT TROU U ESM RSIE B TN

Y — Fin de la carotte récupérée (1524,24 mkb)

Fin de la carotte no-6 (1524,5mkb)

Début de la carotte no-7 (1524,5 mkb)

1524,5-1535,0 mkb course; 10,5 m récupération; 9,36 m

—\_pourcentage; 89 % RQD; 68,8 %

1524,5-1515,0 mkb Plusieurs microfraclures sub-verticales colmatées de calcite,

-\_2mm et moins.

1524,5-1532,95 mkb et 1533,45-1533,86 mkb Dolomie gris pale à blanc, parfois gris moyen, litage plus ou moins défini, bioturbé, très recristallisé, légèrement calcaireux, semble silteux par endroit, d' allure cherteuse à l'occasion.

- 1525-1526,25 mkb fractures ou fissures de dessiccation {tension), sub-verticales (20 degré par rapport à l'axe de la verticale de la carotte), pas de déplacement observées, ouverture de 21 mm, colmatée de calcite blanche, sa base à l' allure d'une brèche cimentée,

1525,4 mkb; vugs, 1 mm-1 mm-1,5mm, non-connecté

1526,4 mkb Porosité de pin point (plusieurs)

- 1526,4-1528,55 mkb Zone de fractures, plusieurs zones broyées, porosité de fractures, fracture comparable à la grosseur d'un cheveux (ouverture), dégazement, certaine de ces fractures semblent colmatées, mais en partie poreuse, présence de dissolution de calcite sur quelques fractures, observation de porosité de "pin point" ou parfois rectiligne (10mm maximum), observation de cristaux de calcite très bien développés sur les parois des fractures, orientation aléatoire des fractures, aucun axe préférentiel, peut-être vertical à sub-vertical?

Zone à fort dégazement, et odeur de gaz

tr; ~ssssassasss ~s~ sssasss r r~ra~assa

•01/11M,s--wRa----

0 IÎt~ÎI l faasssaaa

~I~~Illf~~l

~illlJfi~Ilf ~r

~»sa«sa~ aarsasassssas

.

h ~

1'46'rssssaassssa

rffr 1

.5 3

1 .5 3 0

1 5 2 9

rssssssaasss

~ ------ r sssssssss 7

J

3. .2

.5

f

Ch

Ch,

raaaaaaaaaaa

r3. .3

1527,3-1527,7 mkb zone bréchique poreuse, très fine porosité de fracture et de dissolution, 1mm et moins

1528,55-1530,5 mkb Fractures multiples aléatoires avec quelques sub-verticales, 2mm et moins, colmatées de calcite.

- 1530,7-1531,7 mkb fractures sub-horizontales et sub-verticales, encore un fois comparable à la grosseur d'un cheveux, porosité plus ou moins continue, quelques vugs, 1mm et moins, dégazement.

- 1532,88-1532,55 mkb Fractures multiples aléatoires avec quelques sub-verticales,

-\_2mm et moins, colmatées de calcite.

1532,95-1533,45 mkb Dolomie calcaireuse, gris moyen à foncé, litage très fin, plus

a f

ou moins 1cm, bioturbé.

Fin de la carotte récupérée 1533,86 mkb 1

3~ 4

`1 5 3 5

Fin de la carotte no-7 (1535,0 mkb)

GRAIN SIZE

r

ritettr

.5

-714,~ ;

~.5

1,111'W

muni

cÎÎv

I I CLAY

SAND SILT

B MPB IEOI O TRT TROU U ESM RSIE H T N

Y ..,,.~-

1 5 3 6

1 5. 3 7

1 5, 3 8

1 5 3 9

SOQUIP St-Flauien no--8 (carotte no-8)

1535-1540 mkb

— Début de la carotte no-8 (1535 mkb)

- 1535-1535,3 mkb Fracture sub-verticale, pas de déplacement observé, ouverture de 5mm et moins, colmatée de calcite blanche, zone de dégazement vers 1535-1535,45 mkb, mais très faiblement.

1535-1540 mkb course; 5 m récupération; 5 m pourcentage; 100 % RQD; 90,8 %

1535-1535,75 mkb Dolomie gris pâle à blanc, litage plus ou moins défini, bioturbé, légèrement calcaireux, très recristallisé.

1535,75-1540 mkb Calcaire dolomitique, gris à gris foncé, aigileux à très argileux, litage peu à bien défini, régulier à irrégulier, bioturbé, riche en lithoclaste, (2mm à 40mm), surface d'érosion, épaisseur de certains lits, (3mm à 50mm).

1535,5-1540,0 mkb Plusieurs fractures sub-verticales, certaines 45 degré, d'autres 20 degré, ouverture très fine, 2mm et moins, généralement 1mm et moins.

ssssssssssssssssssssssssss: #3!###11#11#1l:###3lf#f##C

s~`s#

((sfs~s'ss's~s~

2fs~s~s~~q

Vtf4ffjf3{sf f•i;f((fisis4

• 'Ç`~

s• ;_~ sIssres :;~ ss=sM:=5f sfss.=s,ss==,f s

1 5 4 0

t s /

1. f

f f

{

— Fin de la carotte no-8 (1540 mkb)

??

??????4????? ??'

~ 'or ?~??

???6r??? -r ??????

~hhhhh hh hh hh/~hh

✓ r r

??irt-?? i~r~~~??

SO4UIP St-Flauien No-8 (carotte no-9)

1672,0-1674,70 mkb

GRAIN SIZE

I SAND

cmfv SILT CLAY

B MPB IEOI O TRT TROU U ESM RSIE B TN

Y

? ? ? ? ? ? ? ? ? ? ? ? r r

'1 6 7 5

— Début de la carotte no-9 (1672,0 mkb)

1672-1674,70 mkb

course; 2,70 m récupération; 2,68 m pourcentage; 99.3 % ROD; 94,8 %

- Dolomie gris à gris verdâtre, litage onduleux (10mm à 300mm), faible pendage (5 degré), plusieurs bancs à lithoclaste (5mm à 20mm), carotte d'allure cherteuse, quelques lits de shale noir à noir verdâtre.

- 1672,25-1673,35 mkb 1674,00-1674,68 mkb

Fractures sub-verticales (10-15 degré par rapport à la vertical), ouverture de 2mm et moins, généralement 1mm, déplacements verticaux observés (20mm et moins), colmatées de calcite et de silice.

Fin de la carotte récupérée 1674,68 mkb

Fin de la carotte no-9 (1674,70 mkb)

-1 _6 7

.3

.1 6 7 4

'.'. '.".

~ ,.. =-- Ma -- --- — — — d------------ =-- — sin aamaa

a-- —aa --a — ----NIE ---aa

,a -- -- — -- — — -- ----------a—m ~us--mi= — --- — — — Cairn a—a------ ,a—a — — — --- — — — ------------- -- — — =I Nu I=

-- — mn—

a -- — — — a — — — -- --- -- --- --usa a --a — —

•-- -- a—a — — --a fi—a --a — — --'-----s----___a--amusa T-] ,a—aaa MON --- Aina---- aa—aa -- ~ — SI= a =la a— =Sa — 7---- NUS —mania -- /aa—a ma — =lima ma —a— ala — —a— — a-- •—aa -- — — --a — — ----- OMM aa —a-- Jaaa -- m I=-- — — — ~+------aa--

—a--aa—ama -aa—a—a------ usaa aa— — — --------aa I---- — On

a — — — ---a--- ii;C011—aaa----a

a— —a —a MUNI MOU I-- —aa— ---a — a /---- a--aaa-- ~--aaaaa m m--a --a-----a a —aa ~m--a—aaus—a-- ---a— —a— a a-- — al= la =I la — --- — — a aa--a INN --aa—a m

_ ..A0r

V717.7 01711,

--a---a— — a— I UNI aaa sis a— — —aa OMM aaaaaa—a Nil aa 0—a—aa —aa — aam NI a---- ---- ---mm— Mal ama -------aa MIS -- ~--- main= m—aa •

1'~ a-----a--

da—aaa--a-- III —aaa—aaa - sa= ma — aaaa aa

~---a —aMI= ---a II= —a--- sin ---a 01.— Mil --=la OINS a—aa •-- =un --a OIE a--- IO lin ----aa ----a 1--aa--Mil -- =I I= ----a—~ —a Iaaa— UNS aa INSU -- --_ — _------aaaa —a ~ aa — aaa-- — a ~— — —~—~~w—iwr—a

SOQUIP St-Flauien No-8 (carotte no-10)

1674,70-1687,02 mkb

GRAIN SIZE

SAND

cmty SILT

k 1 1 1 I C O Y

B MPB IEOI O TRT TROU U ESM RSIE B TN

Y

— Début de la carotte no-10 (1674,70 mkb)

...\.

Gres blanc à gris très pâle, grains fins à moyens. sub-arrondis, tri moyen, ciment calcaireux à dolomitique, parfois argileux, litage oblique avec surface d'érosion, épaisseur variable (10mm-40mm).

Calcaire gris pâle à gris foncé, aspect nodulaire, contact onduleux, alternance de shale et de calcaire, riche en lithoclaste de calcaire, litage d'épaisseur de 10mm et moins,

-\_généralement de 3mm, légèrement dolomitique.

1674,70-1677,90 mkb

-\_Deux fractures sub-verticales (25 degré et moins par rapport à la verticale de la carotte), ouverture de 2mm et moins, colmatées de calcite,

1676,60-1677.00 mkb

Lithologie comparable à précédemment, toutefois les nodules sont recristallisés en dolomie de couleur gris

. bleuté, la matrice est riche en fossile (wackstone à packstone).

1677,65-1677,83 mkb

6 7 5

6 7 6

6 7 7

6 7 8

--\..

1674,70-1687,25 mkb

course; 12,55 mkb récupération; 4 2,32 mkb pourcentage; 98,2 % ROD; 89,4%

1674,70-1675,35 mkb

1675,35-1676,60 mkb

Calcaire gris à gris pâle, finement laminé, contact de base onduleux (érosion), litage de 1mm à 3mm d'épaisseur, contenu en grès, (calcarénite), les grains flottent dans la matrice.

•-•\

-N..._ 1677,83-1679,20 mkb

Dolomie calcaireuse, gris à gris foncé, tendance bleuté, finement laminé à bioturbé, très recristallisé, silteux à gréseux, (dolosiltite à dolorénite), les grains flottent dans la mmtriro

IL. .. os. ., . 1677,90-1679,90 mkb

- 1679,20-1680,30 mkb

Dolomie faiblement calcaireuse, gris foncé à gris moyen, recristallisé, litage onduleux, d'allure brèchique, plusieurs lithoclastes de couleur noire.

- 1679,90-1681,80 mkb

7 9

6 8 o

LAl L i L.~ L L~:

â l.T.l.i i al :~

L rT= = :TL .T. ~

L L LTL i L i â i ~ âT

. NF gr i ~TL 1, i ~TL

L L L L LL i 1, ,r

1. ,F LLL. i~i~ ~TLi

L.~LLi:LLAA. AL .

i~ YT, h ~T~ ~ ~ 1 ~ ï L

L.T:: L. i L:. ~

L , TL.~TLL ~T:L

L L: LL.TL. ~L L T T T T T T T! T T!

Al . . . . . i Al Al . .

L A. i ~ L ~T1,

L L AL

L LL LLLLLLLL

• Al T. t t~ i r Ab. Ti

. ~iT. ~T.T~LLi

. ~LL.TiiT~iTr~T

L ~TLL. ~LLaiTL.

L L.iT.~TL.i L.T

LLLr.~~T.âTLi

.iTLâ.L. LL Ir

T! T T T T T T T! T . Al . A. . Al . Al A. Al .

LLLL LLLLi.:T

Al i!L .T. f ► ~ L L L

LLL.iL:.:.#.~ T T T T T T 7 T 7 T T

p

... ..`

h T~~•~.

f r f ff~~~

t

f ?~~

1

11 ?

ff'-7

i7?T / `?~~

6 8

f 41_ rii i

r r r l r r f r t f l!

2

t t t 7 P r r f L r r T f r

~.~ ~1?~? . ~ .

6 8 3

'"r

Fractures (fissures de dessiccation?) verticales à sub-verticales, peu ou pas de déplacement, zone brèchique vers sa base avec un peu de porisité,(vugs à 1679,5 mkb dans la fracture), dans l'ensemble colmatées avec de la calcite.

Zone intensément fracturé, d'allure brèchique, poreux avec developpement de cristaux de calcite, ouverture de 5mm (1681,25 mkb) à 3mm et 2mm sur une longueur de 70mm minimum, dans l'ensemble plus ou moins colmatée de calcite et du matériel de remplissage (lithoclaste de dolomie, de calcaire dolomitique, et de shale.

1680,30-1681,80 mkb

Zone d'allure brèchique, avec matériel de remplissage; dolomie, calcaire dolomitique et un peu de shale gris foncé à noir, semble avoir eu un déplacement, riche en calcite, semble-être une fissure de dessiccation avec remplissage?

- 1681,80-1684,90 mkb

Dolomie cherteuse, gris très pale à gris, avec des zones dentritiques à rectilignes noirs (finement picotées), plusieurs niveaux recristallisés. Caractéristique de la carotte de St-Flavien no-2.

1681,80-1685,40 mkb

Fractures sub-verticles à vertcales, peu ou pas de déplacement, zone brèchique par endroit, peu poreux, colmatées de calcite, égaiement, observation de petites fractures de types "cheveux" colmatées de calcite et de silice, orientation irrégulière.

S f rSrf~~S1

F1

8 5

"i "a. Z~~~~~

• l 4r- ri. 4e ! f f.

r

i'SSi f'

'i

-r1-3

i'i'~S'i i ,

•~ ~'.....

a :... .:.~

-1 .6 8

.6

't 't I

'1 .6 8 .7

'1 .6 8 4

9

'Yi £~~Y

~

~~ ~~

~i S

. .~

i'i ~ ~i i'E'i'i't i 4 1 i t 4

i tj I S iit

AAAA Ar. AAAA ■ MN M,1=1 MI•111111111111=~~

1684,90-1686,00 mkb

Dolomie calcaireuse très bioturbé, description identique à 1677,83-1f 79,20 mkb.

1685,40-1687,02 mkb

Petites fractures sub-verticales, 2mm d'ouverture et moins, colmatées de calcite.

- 1686,00-1687,02 mkb

grès blanc à gris pâle, dolomitique, litage oblique, parfois à lithoclaste de grès, épaisseur de 5mm à 10mm, argileux, grains très fins à fins, sub-arrondis, tri moyen, ciment calcaireux à dolomitique.

- Fin de la carotte récupérée 1687,02 mkb

- Fin de la carotte no-10 (1687,25 mkb)

SOQUIP ST-FLAVIEN NO 8

"STRIP LOG"

._ MINIM . ---- ._ MIN _. MINIM MI INN

~~rir RITAIr4F4,

légende

Tara daranaernent

000 à 030 mir`mèlre

030 à 060 mbmilre

060 à 090 mir-mètre

000 à 120 mir-me1re

120 à 150 rob-rare

150 à 180 miHrrètre

%//.

•❖:•• p.0.40 di.

OaZ total; % 064A5 .25 1 2

3 4 8 16 32

1 I I I I ~ 1 I I I J

ex 200 uiitiés = 2 96 ex 1000 mites = 10 96

Q ~~ ; % I 10 20 30 40 60

I I I 1 1

CAL.GARE ( Ca)

D01_4ME ( Ca At

Lithologie; 96 0 S 10 2ü 30 40 50 60 I I j

Î1

70 80 90

1 1 I

70 80 90

i 1 I 100

~

I

sable

grits

shale

calcaire

Monte

calcite

carotte

pas dildiantion

---

&AA

-MIIMMOM --'

~~...

1183

101

I er N I. m m F- -- La Is s I3. s— Ir1

O w

rr Ri S S 1"-C.0 ~

=I W m =zn

r

r

7.2

mit

hl1

36. 6

m

w

IA

--.ZC ...... L.iW W

r-1 = =ol- I- WN

O _ Na li CCC= =ZLv W x WZh- O- Ili

= W=wSlrm• = z L1CIUrFrSdiLa W

[MIH/MEIIE)

AE

MH

IIW

IES

L17

■©

GIE

4

/

G.SOIr,OZOW = = O PU

=1

N0 WI N M

i

M C ~ VI L » A ►00

I I

Y) O In ED Q► a

I j I I I

rm r+.=

~ ~

I

Li = CC :2 C= om w+ C= LW

iL...+m. CL. II• W C7W ...a CC

C7 :a W Ca W Li 6.1 ... F.• ?

lie =IC=IC=h•• ....CZ =I hi

W

LWa 60 6W ZCi

lip ZJ~ jr.~Z~ W W 0 0 Lk{ N ~, J ? ~

Z=aWW CO II C~ iA w JWi~J )—i 1,„,611

Z W ~ ~~~Qu=I C~ GJz ~ 0 W W Q

mm

0 W ~,~ WN ~ =

al 1Q CC 661 EC ii Ng W W ~ N ~i

~ C.~ ~ V i.., > > ~ f..i Cz ~ W W ~ „aZmO V~ JdLA

C?~œ W f.C

.1 ~ w C~.1

.. . ~..rj..,.''.

. . .

.

. . . . . . . . . .

• vrrrrr.

`

. • . . . . .

,

~

. . .

• ''

~

~

. . ,

■1.161i1.161■

rr/rrrr rrrrrr/.rrrrrr

rrrrrr rrrrrr

1~~

r

rrrrlrrrrerrr/

~~;

/rrrrr

y

~."TT•'~

rrrrrr

rrrrrr

.5.11 ■111M ■p.■ .

.

~rrrrrr

vrrrrr 1 ~

vr rrrr: r~r.+rr~. : rrrrrr:

ojilis

1

_ 1 _

!

. 1

v/rr/r

'

I 1

l .

. .

~

. r

4

p p O

M fil Om

he a

in

~ s © 0•

. r r i 1 1 1 1 1 1 1 I 1 1 i i (

6. ▪ -~o C ~-m oC '— m~. e ~- m ~

WrCC C:E ccF--.CI 3r C W C7=lrdm lid S..1 L,~F—?

_ ~

E~ W

Q W ~ Se D:

Q: up

é ~ Lid r" • a:

W Li SI La WI Li • W .J Q el ?. I— )— G?

! r , ;

rirr1 •

-~-'•---.-...--

; .:

'~,

444 4rrirri ir:4+i+~

E‘

;E

E :

, ;

E! ...

E~ ` . ` .

;i

,--.

. ~

;; :'

`....

~.~~+;~^~!'`r,..~

.~.~.~~~1...`:

'

E

..., ~

rryirr' '~,

r

,~~

; ;

;,

,

a, r- 1r

a a ah

. . .

It. in w

.. v. rk

i r .. 4

I

co co rr ■ ■ ■ N N N

I I 1 1 1 I 1 1 1 I I I I I 1 1 1 O • u~

• N M1

N • �

Q • �

Q • N

0 �

N N �

O ~

i

I

i

O lA O r V fv

I I I

O N �

I t I I

' rroezXsl- — oZ o rr v=r.im w+r..1 u — I- DR

w

~ ~ W

hri MI ~

Yi W ~~ W~ lai f"

~ Q. W ~ i 7p Q W V

~~ ~

NC° ~ ~ r~

~ ~ ~ La.CA

c~.~ ~.. r @

S ,,. ~ 25 [777 ~ œ W d d

~

_ . .

: . ~

. . . .

~ i , ~ , r~).>,>.1

. .

w•

_ .

1 f:!: :

~

.,.

r ! Y!*~!

.;

' E

~.. . .

,~~.

4,

`.

i vsti ;.~~

. . . „

â m ~ m N ^ • P.

N N N N

N N M! 4r!

I I I 1 I I i 1 I I I I I I I 1 I

: N N

~

N Q N N

~ N N

in N N

Q IA N

H~ N

Q V N

Q 14. N

Q . N

~ . N

Q ~ N

~ CZ +r+ W CC im wCC

1 ~ 1 1 1

YrCaOiOF -- OZ OW Q O W CO W Ll L..1 — I"' MD

W

N W IP!

! W a ~ 1. b• W 141 lid = ~

JtEl 61 Z1"'• CO ® ill s =in X ' W ~ V IC ge

La. 0 ~~V r r

if) 441 ~ J W

EÏL

LAJII~'' Z L.~ CC W `

CD ~

111

. .

. ; i ,

: ;

::

. .

< < < - < < < .r. .. 11;~```,``<'<'`~.r..rr..a•<•<•<r..r.r~.

r < < < <. e ~~

< < <

~

;:

:

'

. . .

-

. . . i:.

,, ,~ - I-1;r

. . ._ ..

~

..- .. . . . .

,

-

•. . ' :r

,. . - - . .

TYT'!T :

. - . . .:.

ti--r--

-

:~,r,~

,_

V ~ M Â ~ ~ Ô L

~ ~ ~► ~ P v {f!

M re)

M S M M M

___Al al o %O m N ti Y M M M'! M ~ ~ ~~

1 I I I I I I 1 I I I I I I I I I O I!7 O Y) O Y7 O in

O Y9 ~ ~

O IA co 16 O LA C w am • • •— 4.- N N M M N 0 V r ~ ~ ~

M 1

sZ

N

n m -~sZ ~~++s

M

i

M M N ~ I

f 1 i

i

hrCQIIZt— •— O= C'7 W ==l=2 Li ••••t— }

W Z W

iy/1 idd~ y N W

~ Q' ~ W

d ~` Ga = 1+.1 f~A I~ ~ ~ _~'

W ~ ~W Z~ e ~ fA

C ~ J~ D ~ ~iTi~~

L~ ~ Le M. 1Q W w ~ ~v ~ II

Us ~~ ~ ~

WO on

~ ~ ~~'...,<.<.<.~,<, < k < ~w- "'i'*"t'hnr%'

1~1~ ;' i` <~<,< < ~+`«-^h.~,

P,~i,..;..

;t.,•+-~•!•~;,• ~ <<<<<4ijl.

` .... <

P

.

: . .

;*

;

:~}

: :~

.. ~ :._ :. . . ii: i:ii . . .. . . .. . . .

~

!

:; iiiHi

. .

'` ~

. . . . ... .. . _ . . .

~

. . . ._. . - • - ._

:

- - . .

:iw . .

il

N ~ N C N IÂ ~ m M ~ In ~

. M M N

.

. ^ .++

M M WPo I' ~ ;

i -L rI I l r t__.1 l tJ

y m O at Y? trI ~ i.M N !1Î ■ ■

r . ■ ■

~ r ~ ~ ~ ~

I I I I I I I I I I I I I I I l I D In O 6A O LA O

in O M) O t~) ~ {~) O iA © 1!) O a ~ ~ ~ ~

M ... ~. N AI IA M ~ lA .~ .~ ~

I I

Ir. CLx1,QI—O= O W Ci= W I= W U 1..1—I—s

Z Z M w IA 0 owl

M LI J 6) W W if) Zw

0 S big O -

mZ~ Z~} r•i~ ~ZW i= SF'

r,,W~ii ~~!•ÿ~w~ .m m Qi — m (/!

A. fit y ♦ O W CA W

Z ~ — O W

O OL~ W~Zmm ~~

~O~

Q O Gd — Ca W

c•.~ ~ w ce~ c•a eg ,~ •~c~ w

a

X ~ s û

ql-rir,r rjrr~~~;ri~"~IM ~ . . . .

. . _.- . , . . . . . .

~~

. . . ...

: : .

' ;

a _ . .. . . .

1.

_

'i

'i

• :

• _ . . .

'

:

;

_ .

_

.`

:

`Vf - f

V

J

~

' '

i

~1

! ~J _

.

, .

_

.

rTT~;

. .

j I ~ L '

QM1 PA M1 C Q1 $ p ~ m ~ O • • • N 141 IA M! +w'

RP LA LA !U LA LA LA

i____F ~ 1 ,

^ Wil O O r+ O r~ ~ • . ~ N N N N N e+,i N

I I I I I I I I I I I I I I I I I Lfl O N O h O h G Ln O 0 O IA 2 g O IA O ... All Ma w 11M. 11.11 r AJ AJ M IM LA LA La r ~ ~ ~ ~ LA M LA LA LA IA M IA LA LA M M 1 1 1 1 1 i 1 1 1 1 1 1 1 1 I 1

O 91)CZ= — W pG Z=— W I= i

I I I I ~

him © cc lERI-. -- O Z O W ==d=W L7 L.1...*Cm

H IA 2W

i W W y

= i W Z

■ mm 61.161

W

W A et Won !.■

= wD v► ■ 1.... ■ W r

W—V ~

myy O}~ ! H+ — ■ ~ ■ Cû

~

Jy;VCS 6 ~ g ~ ~ e _12.

CG im 1m CM

CCC ia ~~2~ GI• lid

C3 N C■1Q

I= ~ z

0 Cl N

. < < . < . a:as:►:a:a:r

1rdy#1 1-1-1 ~ < < < s < < <

< e

<<<

.

< <<

lÎ jt j~ ■~ ■

• 411 ~.t.4.,< <.<..< < <

<

,

< < < <. <

<} 4.4

< .}

. e /

;

1

"

;

!"

•;!

•;! '

;

~ ,<<.<<<< ,,~

. ,• .

:

; ~ti Cti4~~

.

~ . , .. ~.. .._

;

_..._ ~ - .. •

VO WI WI M N N w O N co QI WC r. Vb m 1O

'` ' i i w w M N !V ~ M• N lr7 ,r.N L~A I 0 ►OC NO ut i.O kC

rr .w N t1i Q~ IA ~ If) •i N Nj . N N N N N N

I i ( i i i i i a f i I i i i i i O In O In O 0 O In C► Ifi © If) O u) Q u) $ $ C ~i %I !~ M1 a ~ ~ !6 ~ ~ ~ ~ N N ~ ~ ~ ►s ►~!~

IA

N qsZ=~-WC= eu O 7eCZ=lWm

!►1

141

i

• M1

1 I

N7

~ • O

• ~

M M1

M M1

rrasXsF-- = Z =w Q= kid m lad u 62—F-og

yr• m NQ_ I= 5 W W =

9 ~ hid

h W ?~• J yaj

V~Ga el COW P. N L, i ~

1<4 <</ • ' ' ;

fi11:, : • < < <

/ < 1 < < / <

S < < ;

~

~

I • • •:•:o •

< < <

< <

i

<

i S < S <

i < <~

~1

I ~I I I

( < < i < <

• • < < <~~

. . . . . . . . . . . . . . . . . . . . ~ . . ~ 1

I I

. ~ . ~ . ~ .

~1

. . . . . . . . . . . . . . . . ~ . . ~ . I . . .

r. •

~

~ N ~ M L~t9 ON1 1MQ M m Ô

i i i i 116: û 4 v a Iri

~ ~ ka ri.

ha ►O ►•O ~ M1 M1 M1 M1

^

T ~s J u i Frli.,_, -,--Lr ~l f

M M Y' • M m tG m N N N N 4 N IAI M M N

I I I I I I 1 i I I I I 1 II 1 I _

I~ m C di

I I t I I

N 1~1 m C 47

N N M1 M1 M1

1 1

i SV N

1.r Cf sImF- — OZ O W v= W m W L.I L.i~l—Mi.

'12m IC`~ _ = yd W 1111 = = fi.l ~ ~ 'Ig

m °p 0 0 O_ 0 ~d°d AIM C i ~O~

hid

W W W=ry 411 4#) G~ Gda1 ry we .11 i. cc Zw~ fwJW~ C Z ZN ~

C.~ O éw ~ N O S I,Op ~ ~.r ..i ~ J~ e~ 1i {~ ~ •.~. ~N V v C C m

CI ©

I I . . . .

fso.rew

. . .

....

r

.

r

Weill

;1

,

111.1.1•1 r ~..

'..; iP

4 < <

~.

_

.

. ,

~

_

~~r'.

ingiwom

.

`

,

' .

; J L H!II

,I,LIn•1.

... • . . .

1.

1•• ~~

:

:;

,

41r-r~

I ~

h NI 40 N M N i. O Il'f .• kC n G !h i. Np w# 101 M M N N•-•-. a Ir 1117 1II r■ CO 0N G vim nI 1`6. M1 M1 M1 M1 M1 m m m

,r_rr

I -,_ --r-L -ri,.

~ _FL_

D

j

s~ a~ N m ~ a+ i+

1 N •••

M1 M1 M1 M1

I I I

-" CCZoan ~us

M1 ~ m m m m n

ECZ

1

L1'! N r V 0 M1 CD Ce m OF Ce Ce I I I l 1 1 I I 1 I I I f I

-,e eo•-o ~ n f

Ep

I I I

IP -, o o

a ee

O • Lfi • en

O a LT

O N

ir omXsl- — oZ ow+ ia= loll m ti++U La—F--2t

~ MI CC

1. .. W S

C

41 Rn JW~ ~~~

~1LI

~ V ~fA GC m

~~_

CiiGC en GB bi g w S ~

V(p Q W V W~ Q LC~ - ii Q ;S a ~ _

ms N

i' e.12.1:411. 4 c Y~FiF+~ITtT1

< 4 I< • '1;1~1' • P•p•Fi~7 ~ !!, ~/

. .

......~~

•'' !

•'~ ' ~' •

- .

! 1111111 ; 1~1~I1~1 !~~

;!~ •

~ . . . . . . ! ! . _ .• . . _ . . _ . .

171,

Fin.7„..r.r . rflr, 0

O as IN. in ^ in O so n Q~ N LA C1 I- N i!! r. LA en !I' I:e i : ti r r a w• ~h• M M V in so Ib O On © is. m as m ee m m ee a en en

n Z~ _ -- ~~ ~ jr1P-rirrriL,J1_11

~,- ~t_~

r. M ~ fm N Nl Fr! a a a N9 ~~ 4

I I I I I I I I I I I I 1 I I 1 I

►~GCC=IF--0Z Ow Cr =uJm11AU

1 0 1' g 1

i i <

< < < s

j., _..r--./

iiP

')..11..1"

I I

-p I= Z

e c ..

i

r■ ~ N ^ Q1 Q. co ~ m

ea ess ~, es *. ~ I~ hA en

~ . ■ . ■ ■ f~ • d

^ N N *- •- ~ cc

dN+ a~+ Q+ v.

~ ~ en ~ a. ~

~ M9

_1__r-- L..

Q+ r■ ~ W7 ao i!7 Y7 Fr'l

M M ~? rill ••• ■ ■

••• ... E. mi

I I 1 1 1 1 1 1 1 I I 1 I O Y7

Irj ~ If~ Ci In S7 WI Q It) 421 i~ O 61') el. e M T 14 i!! 4 4P~ I~ • VP f+1/11 CF en en aR a• ar a+ cr. en er er eri C+ Ci O

1 I I I I 1 I 1 1 ) 1 1 1 1

N .5 = 2 N ~s 2 = —Ws

~ I a

a a

:.; :.: • ~1~ ~;1E!~ ! ~~, ~!

.el~3! . ,

.~.~. , _ !..~

rromXdF- - ©z

F-~

G lid C7=W I= 1..1 LT—F-3

a w

~

WI é o PM

^

in M

re' • sr

Z

~

f

Lt! LO

— — ~ ~

1 1

G ~ L= Z CI 1i1 L= R3

1 1 1

a

i

Pd, � —

rom ~ — —

■~ 7LZZ 0—W Li IM'!

1 1

g P m

Y1YGSIL=i--- CiZ Ci W Qd W Li'IW Ll L,-I~ -,11

W A! W 69 W ~ ~ LU mi 0 G CI _ ~

~p Q.Q 1 ~jLtil

Ÿr * La 64 ~ al

Lal ~ — .r ~ ~1~1-d Q i(7~ ~ F~i.~Q ~ it ! ^ fg mk Z W.. ~ ~ ~ ■

!ÿ~= ~ } C.0"~~ ~Wi.iZ — COC~â .J p p~ Q LU -' i.i^JfI!

Gp}u a ~. Q CC O ~p ~ ~5~ ~4 w d i.? al CC

X

W

~ Ci

®

~ ~QL

i17 N

Z ... t

1 cri m ~

~;1;1: 1 Gyp; <<t• I ' . - -

~~.

■1.i■1,- i-~iiJ 1■i'i'

~r~r`r.~~~

nni"rn'

. . ~_I _~

~ ~u '~ i' ~h!!,

~_~

,.. . . . . . .- . ... . . .

;

, . _ . . . . • . -

,j

. _ 0

ri

~~ il 1~

1~~.-

.

-

iI I It1 ÎÎ ÎÎ ~_

`

~

.. w•+ L~A M1 !1W ~ d

O + ~

M1 V

~!~1 N h+9 ~ LA ►D los Im lm ~ g= im Ilm lm

— — — — — mn —

M1 M1 M1 Im —

er. 119 a lm —

~

~

1-111--1_

Z

-~1nT

~..~ LJ

r+■ cv a+ N ~ v

M N 4AÎ ■• — Ô Ô C'!

. r r L ! ; :. 1 ;. ~ 11,y é 6, Ô LA d LA C

W ~ O 1~ =WZHGZ a

C

M ~

~ v ea

La.

0.0

L.i —F'}

a7 is i1? h'i -115 10 LA ru M M N N N Ir! RP LA N N N N

mi mi ■.

0 *04

s

rl-

L-i v

F7

W

1kkA

3 ~

i

wa N

1■

R I

N

1

■ N7

■ M?

. a LA N

1

ea

i

n~ -

M! ~ —

Ida E 1—swd=1..- o = LEsc: =a kid arr+ Wx=ryo.

1~ ii.

z b1

p/

01

~C ~ 0 ~

E ~

t .si

i '~ v Ili w '' w+ al

'GI

Ts' 11)d

gel

`

~BS w

~ o

1

~

Ira C i

~ ~► A ` 0:

Î111ÎIÎ

W

'll'lItp~,w~i ! 1 1 1 1

111

111l1 iiiiIIII;'i';'i

1Î 1Î1Î1Î 5f55S's 111

1 111111

1 111111:"::5s

II'I II~'

llllil11111

1 111;;:5:;:

1 1

;;;;5;',

~~,~'~,

1 1 1 I l r

11111 111111 111111

1Î1Î11 111111

:;;;;fr 1 1 i

f555:5 ~f5f::,

11111 I

11111 IE 111111 1 111

Î11111

11E111 I IIIÎI

lilII11:1 11111Illlli11111

4 ►

111

1111 111111 ÎlilÎl

l 111111

11

11!

111 `11111 !.i!

11

111111 111111111

iiJ

11111111 1

ll Ili

111111

IÎIÎ11 111111 111é11

111111 1111!1111

1 1 l

1

11

IÎ111 LM

{

11111 111111 11111

111111 ÎI111

ÎlÎlll 1111

•.

1111 ''.

111111 111i11

11111

111111 11111 ;_tiÿ--i 111111 E1111 _-

111111 11111 .-_-_ 111111 11111

11111 :_____a 111Î11 111i1 111 111

r-----.

111111111

- r

..' .---.••'•..~

r_-1

ti

- --

;111111 -I 11

1111 111

1111111 111111 111 j11 111111 111111 111111

iIl 11111Î

►~t

111

111111 111111111111 ÎIl1Î1

. .

11111

. . •••••• a•••• • • •r _ hlrl ..• ■irl ■lrlr ■Irl Erir

~,n n 7^

~ - -ti-I.v -r ` ~ _~

~ ~—= ` O11Î111 s

~vr~ - %i-f/V: 1

~

ti_11ÏÎC111111: 11111!

ti~. N _ r

vr..rfn.~ .`~-

11111; :

-_-.\

_-,~~~.%, -% "~r"~~~

` ~_~„

A

~~~,~~~ ~

6.5i ~

~ ~ ~ N tÎ1 N h'3 nw — —

~ M â ~ ~ ti

é d eû ~ ~ ~

M h"+ 1%1 re) n h'? — — — — — —

~...h

~

L `

J L1—L.J'V ----r- .

ri. +• Qm r0 11'7

M M 4 ~ LA LA d 4 !1` 4

ir, a tfS o 119 © tr1 O Lf5 CI IrS O LiJ Ci Ni O L1J M7 fh

1

er er e el N N 141 h'7

— — — — — f 1 ) 1 1

� y-• C7 ~ V •~ C7 L Y7 %.••Iu = ~• •_ ~ L.

fh h?IMM

~►l re)

eU h'7

0=000.1.61C2111 ü=4~7r ~ ~+ ~WW~s~Zh

!1M ~ ~

g U

III 1 j ~

_

___

r_

'I#I

_-~

~~_-

_: -_ ~

_~

- ---

~'

!II_I.I_I_I_III_I.~►IrII /III ##Iw

ililll ililil 111111 IIIii1 i l l yell. l Will

~i~1~i lilÎl~ IÎI~IÎIIIIIII liilli lilili lililil 11111i 1111111111111 1 1 1 l I l

IIIÎIÎ IÎ~ÎIÎ

l

I l

~II~

~!i! ~lilili ~1~i~ll

ÎIIIiI

l l

i i

/III ~ lil~l Mil l i IIII1 Hi 11111 1 yo

Il.00io

l

1

'~~I_i II#~

.111.1 Iliili 1 IIIIII 1Î1Î1Î III Ay ply

Iloolvlu

1

1 1-- _-

^`^

•w~~ ---_ :~_-~-

v--_' -

ti

F-

I_I_I_I►" _~ Iilill

liyil . l l l. ~ i~l~l~

Î1Î1Î1`1Î1Î1 iliiil

IIIIII _ l l l

IIIIiI Door

/IIIrI#I+I;II#

ililil ,III111 I l l

II~III

lilii

l l l

Iiv ioda

lilil ;ii

ÎII~II ÎIII Î~ 111111 111111 l l l 1 IIIIII lll~l~ IIIIII ÎIIIII ililil in

Sii l

i1

hi

1Î111Î 1Î1Î1Î

{ IrI#+/~•

1 1

lil I i

~ • Y 1 ~ i f~1~!!~! IÎIÎ~Î rR!! 111111 l~~4s~.r~r l l lt~~~

IIIIII . IIIiII ~~ IiIIII ~~~ l l

ii l

ii ~~~

IIIIII ~~~ .

~Ill~i ."-,-.1",_,4,...--./k10-04.4,11041

Y , Y , • • YI

`!!14!!~ ~~~

j

►~~~ ~~ ~

~~~~ iiit.

~~1~►~~~

~ ►~~~ ~~~~~~ ►~~~ ~~~1~~~

1~~~

r , • ~

~~~ ~~s

~~~~il~4 l44 M!

~4

4•00• En r

~ ~ , -\-v

' ~ ~

p44

~~~~

-~' ~

a~\ ;1.1.1._

~Ililllllliiliil1111iII111I11

4\►\

IIIIIIIIIIIIII 11111111111_11

~!!!!t!4!! ~j~~~~~~ \.►►

' ■ -

~y%~~I

~- `

1

I~ - 1~~~ w

r P4

~ti ~ ~ r

14 #

1,1 1

-_ N

~~

111,1 .1_s_~

s

I~ .......................................... .., i: ................ ...........

e pm 7. Eai ~

M1 ~ iQ Ô ~ Al I+ ~ M M V ~f ~

— ~ — — — .t.

~

W.

f

1

' /0%0

,1

E

rw

Ill L— ~ ~r~

^ a 0 0 ^ o io: o' M re; M M! e+ki

M■

"'r

A 5

g■

O A

a DL IrA da•w w AO A illN O

~ .. .. i'',

3 R1,12 M M M M M

11 ~ ~ ~ ■• .

I LJ'7 W W= C 101 C

* ~

1

ICE W W= C— W CC

et1 67

1r) w in 6 hi, ill FIN

II CB CB er,

v V' l'' '4' 4' 4' il. . . sm, INN OM

I I I I I

WI id, e in In 611

6 o in — INN

in Ir — l 1 1 I

CI kb le

T I IN.

0 Ili

1004l1*; ;. ~._.. ~~~Î

I~ÎIÎIÎIÎII

111Î10ÎI~ÎIÎIÎIÎIR .10 lrl irl ~ rlrhirir_

11-1-1111111 r r ~ -1-1101444114-l'1'l'1 11111111111 ~ 111''1`l'i11111111r111 Illlrllllllllllllllll1111111111111111111111111111111111111111111111111i111

1111111111111111rrllllli1111111111111 rililiiiiliiililili11111ilililirililili1i111ilililitiliiililililrlilili 1111111111111111r11111111111111illillllilillllrilililiillliil r_i_rr_r_ r_r_r_r_r_r_r_r_r_r_rr_r_r_r_r_r_r_r_r_r_r_r_r_r_r_r_r_r_r_r_r_r

Irlr1'' iiIiIIiIItIIIIII" 111111111111 11111111111r_r_r_r_r_r

CA C~!

, ,ç v

1 11~~►i11

.

S~► 1" 1`111+►1 ►~►1N- ►1 11111 11 .;I~,~Vr ~.~i~~~ ~.I~~.~~~w1*.~ S. 4. ~ ~. ~ _ 1 1►1 ~►1w~ 1 i4~11w1111 1►~ ►~1r 1~111 ►11~ 111~1~11*VM11w►111 ~►11~r11~11 ►~111r111w1fir►ll~► 11~l111►111111w1111►111~b11 SS~4*1~~1►~ 1r1►~1>►1

rVv~~i141R~Sk1~~S 1►11+S ~1►~►~*~s*S SS~ ► ►~ ~~i ~1w~1s ~‘~~S4SS

~~i‘

~ * *4~ ~ *~~~S% s

* *0 .iA►1®1~~.* ~* *1~14 1i~~1►1~►11 11, .r~bS ►1~1111r ~41~41►111~1111► 111►~►1r1~11 1.►A NA ‘ ~~~...i ;'; , 1~~ 11iI~11 ..... . -

O rs W WyCx=xF-oaZ

fJ? p ÎA Ô H? • M1 M1 o m Y7 III 1.17 N Lf}

I ) I 1 t hr W O R- W E_

1 560 FAI

■ ■ ■ N !~V

42 rD ti0

l 1 l

low W = {S ^ W lz mom

SOQUIP ST-FLAVIEN NO 8

r r REPRÉSENTATION GÉOLOGIQUE

DU PUITS

10

SOQUIP St-Flooien No-8 (puits)

Légende

GRAIN SIZE

SAND

cmf~ SILT

V III 1 CLAY

B MPB IEOI O TRT TROU U ESM RSIE B TN

Y

— Shale

- Grès ou sable (Quaternaire)

- Calcaire

- Dolomie

- Calcaire dolomitique

Dolomie calcaireuse

- Dolomie cherteuse

- Pas d'échantillon ou prise de carotte

t

i

'i

x1r i+ âV~ iT~ i~ i~

ale ~i ~~VL~f ~â

~ : 1,: ~-.~: .-._. ~•••::—«i

Zone bréchique

Contact graduel

—t_ Contact bioturbé

Contact d'érosion

- Fractures

▪ Stylolites

- lits obliques

- Oxydé

Pyriteux

1 - Dolomitique

Calcaireux

-\__ Argileux

Silteux

Gréseux

Cherteux

- Blocs dans le sable quaternaire

Brachiopodes

• Bryozoaires

Graptolites

Stylolites (Fm. de Québec City)

ss:ssssssssssf!

Fe Py

=r

a

B M P B IEOI O TRT TROU U ESM RSIE B TN

Y "--r-

.5.

.0.

.1. 5

.Ô"

2. 5

.3. 0

.5

4 o

4

3,

SOQUIP ST—FLHUIEN NO-8

LOTBINIERE

GRAIN SIZE

__L___ SSAIQD

cmfv~ I I I I i I CLAY

ILT

Fe

%

MI

F -------------

P y_

— TABLE DE ROTATION + 143,84 metres,(0mkb)

- SURFACE, + 136,65 METRES,

- Mort-terrain, sable avec blocs de la Klippe de la Chaudière, Quaternaire,

Contact mort-terrain / roche en place

-5

— ontact Kiipple de la Chaudière / Groupe de Laurier ou Fm. de Québec City (apparition des premiers carbonates)

rrrrrrrri

rrrr< r rr

7 o

5

6 0

7 5

.8 5

.9 0

9 5

~

o o

1 '0 .5

5

.1 .2 -o

.1 -2-.5

1

▪ Ô.

1 4 0

-N.

1

.5 .0

.6- 5

1 7-

v

ra

0

1 7 5

1 8 0

— Formation de Québec City ou Gr. de Laurier

1 8 5

1 .9 .0

-9- -5

2

a- o

2 o 5

2

o

2 -1 .5

-2• .0

.2 -2- 5

2 3^ o

2 3 5

2 4 0

-4-5

~a- =�=-i, La

Formation de Québec City ou Gr. de Laurier

a

TE

a- -- ---

-e4

.0

•5-.5

2 6- 0

2 6 5

2 7 0

2 .7 .5

2 -8- .0

'8- -5

2

2 9 5

3 0 0

�3 -0 .5

3 ,1. ,0

tP

tP

3 ~t.

.5

3 2- 0

3 2 5

IP

fiP

3 -3 .0

"3- -5

3

.0

3 4- 5

3 5 0

3 5 5

-3 -6- .0

f- r

— Formation de Québec City ou Gr. de Laurier

.3 -6- .5

3 7 0

3 7 c

C _

r ~ ~a-------r------~.

___

J

3 B 0

~3 -9- .0

.9. 5

L a

4 0 0

4 0 5

-4

a=_

---------

• r~_ ---

a

~a 4

'3- .5

~a-

a: _--

A.

4 2- 0

4 2 5

4 '3- .0

a -1, r- r- . . . 5 -0-

.0

=t

4 8- 0

a-

4 8 5

4 9 0

_4

.9

.5

irrr-r

ô

`4 `4• .5

=E-

~rs•~ - '5. .0

rc------_

4 5- 5

4 6 0

rr r r r r1

4 6 5

4

-7--0

4 -7- .5

!a

Gaz à 449 mkb, 211 unités (2,1%)

Formation de Québec City ou Gr. de Laurier

'7'?35'~

1r

J}}

4.~. 1..•.,~S/J J~,.

t-'••••••• rr ( Vr 'r~'' i•~

i~~~r~~~

lay

~~•~~~~~~~~~

a_=.-.~_~.

;~5'S55'•:i

• ~: rr-rrrr z.-

o - -

0- 5

5 1- 0

5 1 5

-5 -2-.o

5 '2-5

3- 0

5 3 5

5 ^4- ^0

5 '4- .5

5 5- 0

— Formation de Québec City ou Gr. de Laurier 5 5 5

5 ^6- .0

5 -6- 5

r V ✓ 6 2- 5

•.

x

_ ... ~~.

• .6 -2--0

6 3 0

11g

5 7 0

.7

.5

•5 8- 0

a 5 8- 5

5 9 0

5 -9 .5

•6 •0 .0

6 0- 5

6 0

6 1-

-5

6 4. 0

6 -4-.5

-5-.0

6 5• 5

l 6 .3. 5

t .; ... f ~ ,lE~ , r„l

=_

6 6 0

iPy— ~~ r ~ , ~ 6 7 5

6 -8 -0

rrrrr

~.:

•ol ~l~~CJ a

ip`J - ~~.~~ ~. ~~ 1 , ~~--_-- _~

~--- • i~'ar~lÎ'r5 J

-8- 5

6 9 0

6 9 5

Formation de Québec City ou Gr. de Laurier

.7 0

.0 A

T 7 7V 'VW." IF 7 7T A i i i i i i i i i i

~iF11,104a1.110FOU~~ ~ ~~7 ~1'

• ~

ta ilr=

1= r~ =

7 0 5

7

0

✓.7

-1-.5

7 -2- 0

, ,7

~ a------

7 2- 5

7 3 0

.7 -3- .5

t -- 7 ^4•

r.

frrti r 1

a

7 5 o

7 5 5

7 -6- 0

7 4 5

— Formation de Québec City ou Gr. de Laurier

1 J J J_ J J J '

1.—r- '

r-- ~.... rrll ie ~ r

--

~V 4» Air ' •

_

--- ~.

~--

r

~~~~~r~

•~•••~~~'~ ~ ~ ~~ ~ I I ~ -~~ ~~

t ---

TT. T T T T T T T T i i a i i i i i

tSC

_ _ _

~......... . . . . - _ ... .

r=r- ,_,..r. . . . . . . ~ I .•.-.• L J J ~ ~ ~

~~.. ..:..._.~.•..

I.,..r. . . .

T—

8 3• o

8 3- 5

8 4 o

a

8 5•

T T T T T T T T 5

8 6 0

8

-6 .5

"8 -4- 5

8

•0 .

L 5 rrrrrr

8 8 o a

8 8 5 F r~rr' =�_ .a.-

8 7-

.0

7.

8 •9-

— Formation de Québec City ou Gr. de Laurier

►V

=c ----- rrrrrrp:

a= _�__-

11"1rrrw

~~~.. ~~`~: ~~ÿ ~~

8 9 5

9 o o

9 0

-5

.1 -o

.9 .1

.9 -2

.5

9 .0

▪ 9

•3 .0

-9 -3 .5

9 4 0

9 4 5

9 5 0

9

— a des allures de la Fm. d'Utica

Fnrmniinn 'Annn r`11,1 ni I rte. dn I irinr

P

S:C-- ~iS~•~ ---

E.. ..

.. .: '+~'~I 1 ~~- rJ 1

• 4 J'JJJJ

7'f r I ?

-9 .9 .5

.1

.0 o

-0

1 .0 0

a -----_-si% S=

-- -- ~`~ '—flaiii 5~

5 P y-

~f r55,~

5

9 6- 0

9 .7 .0

g 7

.5

I VII IIatIV11 4Q \dUGUGIr ...my VV \+II. VO I-MAIM'

0 1 0

r-rrlrrrr 1 0 I 5

1

1111111 I

SC

2 .o.

~~~~,.~.=

u. 2 0

3 0

o rrr rrr►r,

3 5

L,=.JJ

.0 4 .0

.0. 4

^5

o 5 0

.0

~a-

5 -5

6 -0

ta

0 6 5

r .`

— Formation de Québec City ou Gr. de Laurier

----_.~-

0 7 0

t...... _, .'1r'~

Iz I

-1 .0. 7

-5

0 8 0

0

-1 1 1. 1 1 I

a---- TA.

M. 8

1.5

M. ~0

.ti'r...,

5

1. o 0

1 1 0 5

o

.9.

5

~a=----- r.:~~~~~~~~~

I .. Lt-t'f

2 0

2 5

1 1 3 0

3 5

4 '0

— Formation de Québec City ou Groupe de Laurier

I r arri..Prrcp

tope .. _ 1 1_ili 1 ' L l , l 1 1

i S , I . r. . . _ ~' '_ 11. Py l

E000 ~4 ~~~+r-~~~Prr ;'

111111 I T

r---

,

1 1 ~ 5 0

— Formation de Québec City ou Gr. de Laurier

a . err..rr

1 1 5 .5

.1

.1 6 0

.1

.1 6 5

•1 1 ,7

'0

r1 .1 7

-5

•1 .1 8 '0

- Carotte no-1, 1198-1192,25 mkb

- Carotte no-2, 1192,25-1195 mkb

-- .,A. 5 r _Jr" rd'"=

1 2 0 0

1 2 0 5

1 1 8 5

1 1 9 0

1 1 9 5

1 2 1 Y 0

•1 .2. 1 '5

•1

2. 0

1 2 2 5

1 2 3 0

.1 2

~3 .5

-1 .4 ~ 0

MIN II= MI

py- al NM VP — s~~~~~~w~■

li r ~

az tpy

1111~~~_11,O MMr■rrOM �- L

D..

[~ MO Oh MUMMIES, 1NIMBI= MIMI IM.

NM 1=I=1

IwwMN .

r; ~ i ( ~ i ~ ~ ~~~~

~_~~_~ ~~ZY1D .. . ..

I+RI~ _~.~~ ~

~ /-1111I111111E

- . Pu' WJYL?~flLi~

E

rfpliSSSSE

Q~

ipyamm

a:

— Toit du Groupe de Trenton 1225,0 mkb

Toit de la Formation du Trenton

1 2 4 5

1 2 5 0

.1 2

'5

•1 2 6

-0

1 2

5

1 2 7 0

1 2 7 5

Toit de la Formation de Chazy

•1 .2. 8 '0

1 2. 5

1 9' 0

•1 .2, •5

•1 3. o 5

3 1 0

.1 3. 2

`0

-1 .3.

2 5

1 3. 3 0

3 3

-5

•1 3 0 •0

1 3 1 5

1 .3 4 •0

'•= ravrrii ~ ..---- ~ ~---- • —

'---- NI NM

ti

a

. '.-r

r

I ~

I ''ti'~ f 1 1. f

1 L `

pyi

r 4?

ti ~i ,

120Eir.. 4~Y1t

WAS~ Y1~l

• ---- ..■

------

~~~ ' . ..

tiLWXOCE

J'J'JLZtiSi~ - — mi -- ---- I---- -----r m10111MIIM- Y ..-----

-A--■

----- --- • ~ -------- -- \ =MOM

~-

JY11L—.B

SElf mammal. v ~t~1~

r I AIM=

L. r ' r

' I ~~ ■

T TZ

OMNI

-M

■- ------ - UPI W------■

•~1, .. I I I I I ~

.~~ yL71LYJL~! • -

1111101.1•1=1=

- - Oil -1.MIN

. .. . .. ~-11. • Ma: M.:

J (3

` ta+ ~~i'i7 T 1 ~

t'-==--:~

fccf,

_ 1 1 [

YJ'JLTiW1T

•1 .3. 5 0

1 3 6 0

.1 3.

~5

1 3 4 5

1 3. 5 5

1 3.

0

1 3. 7 5

1 3 8 0

•1

9~ '0

-1 .4~ o

1 3 8 .5

1 3. 9 5

4 0 0

401=1 'L,rioriJJ~~fl11c 1 ~

ANxUNCII

I~- Y ~~1~~~~~ :

Ilr ,~J'JL11i'1 .--..~ 1\ c ~1~r ~----■ ~~- ----~—

C- -,-- --------i

---^---- I ( T

~1~

I I J l I ~f1 1 I I( S 1 l 1~ l 1

r 1 I 1 I.

_—a—.. NIP a_ gaME— M. --- — - — _ a r aNI - — /M___a__ =MP Mani _ ■ _ __a_ _ _ __i_MINN N_ _a_aa _ _ __ _

_ ___ __ a_ . a_aa___ .._...11111 Mil

~a a ___ _a_

.. _aaaa_aaa _ aPM a _ _ _a— i.a____fA411._

aaaa a_ Pima Ma MI. a a

ameguM _aa — — _ a— aa a a _a_ _ _

__ar_a_a_aa_ 'rr_a

raaa a — _ aaa _ a _

\ Pm am ai

UMW __=aim Ya__r__waaa

aMI _ra a IN a a_— — — w UM— —

—_ waa — _ _a

~a.ia___raaa— 1~~~a~ ~—~ ~~

a MI pm _ a__ liffinir_a_ MOM __—a.

~~ ~~:~~~ ~~~. MI — _ a MP _ —

--a--aa_ a a— Mama=

a --Ma — IN aim m. NS a _a — ___ a _ a— iaaa a — __— ar a _ ~aa_a sp. MOM _—a_ \a_-----_aM--. Naaaaa aim _aaa

IN_______a --- \------------ N--_--aaa--- ,__aaa_—_ — — -- ~__—____ Mal aa_ Ya—aa _aa__r —a R_ MINN al= _a MIME _a

~ -

r ~~a--- ~::~._ _wr~~ar=a•ra= —a—a,r.saasa

araa.raaaraaR

_a... Mil _a

a:sassaas:ssas 151513I9a—ar.araaar:a

.aaa Nis aaaaaaaa

inellipsaraasa~a—a

-- -- - . ...-. - -- .. — - . =Er

Mr aim aaaaaaa_Plea

_—_a--__aa.

.a_a_a ____aa_ ~+1.—aaaaaaaaa r~~aa_a_aaa

~aaarraar.far~a

i~a:aai~aMIrrrssi

M_a_ mom mar limos a—i aa_ aaa_a

__ MOM ar NOME a Y_aaa__aa_aaNI

: ..~.~..~.. Y T$,~~aaa s

nua aaaaaa aa

zip

NM aa a — --- _ .ar a_a mamma MIR Mimi a= —aa— a aa—

ape, aaaaraa. _aa MOM aNNW

GM __a__a__■ aa_a __

—a MOM p.m

SIMENi.a ~~_aa

...__

Iii Mr. Nin aa_—a III ria —

~~+a~—~_~Yirw~ Ya----------- ~a aaaa_aa_a_

—_a_ ____ . a _ al a_ __ NIaaaa-_a—aa

—_aaaaaaaa .aa—aaa_ IN aa_a 1111a_ MIN aaa— aping a

a_a- __ _a_ IN _

lLa.~f~rail lil

III a__a MIN Willa _aMINN' rassaa—asa'_sas

I---------w---- ~— ===--a INNIM NUN •maAar._aar.r. Minna -------- =MP

i_ IT; _aaa___aa■ • __a =al r—aaa—a Main __ PPP MIME a NNW a_■ !Baal=~—~~w..`rw~a _wwaa_wN.o._m..N\. .---a_aa_—a__

-1 .4. '0

1 4 1 5

1 .4

2 '5

~4- 3 0

.1 •4_ 3 •5

-1 4, 4 0

1 4 4 5

1 4 5 -0

1 4 5 5

1 4 6 0

1 4 6 5

1

2~

A.

— Toit du Groupe de Beekmantown, 1434,2 mkb

- Carotte no-3, 1454-1457,5 mkb Carotte no-4, 1457,5-1463 mkb

OE— MO Nano MO an —a!laassaasaas

assaaaaass !!lasa!!!!

laaMOalaaaaa

>.! !alMOaaalA ~!oM!!«~!~! IMP AM' a PAP laa

• =!

~!—l--l— MO a• NO — sMO— — ! -

rtIFlrrrrswsssss a AMP sa!!aala

AM! aaaaaaVII MM. lsasslssss

'rtrlssstss!!ss! !aa!!!as!! _s_:mars_!_!_!

N.= 1E5ifil.. Ig•MOMOlaMO--

allarmalaaaaaaa

ila~~l~a•ss= aataltaaa

aaaalsayra~a

*=E ..

!llMONOI•—s MOM !MN !

laii&r.rWrillffAII.W.MANIF AMP aaaaalll!

raialtlaataaaa

~!!lsaaalaaa aaaaaaaat

OMOMOI NM .M — sNO!—MO —

4gEiNer 11.MOir—MOMOw.NO—MONO~

NM 011 !—MOMINEM

!!!!!MON

— — ! MONO— !MO— ~!!!! —! — En MOM -MO— MOr — —s—MO—! M. =1 — -- s ^!— — MIN MN

~-- — — — — — — ---- • iiiiWaaa.aaaaaa

imp

AAA VII AAraAAAAr1A •-- Nil MME --l---! AAA "MIA AAAAA Ira Elk A

Il--!--MI —l— AAAAAIaAA►aAAAA I—I--- NIX MO—!! AAAAA7lAA MIA AAA .11MO—sI MONOMER MOMOMO AA 'WPM A Infra AAAAA OM MN= -------l—

A Ira AMID AAIra AA "MOM Ira

-1 �8. '5

~1 -4. 9

-0

.1

.5, 0 .5

_5. 1

-5

2 '5

-1 .0.

'0

.5,

'0

.1

-1

2. -0

-1 ,5.

-1

3 -0

o

7 5

1 4. 9 5

1 .4 8 0

— 1480-1486 mkb pas d'échantillon

- carotte no-5, 1486-1496,5 mkb

- Groupe de Beekmantown

- Carotte no-6, 7, et 8 dolomie B, 1514-1540 mkb voir description section carottage

1 5_ 4 0

~ „ , rj „ 11 ( 1 , , , , III

<<, ti ,

1 .5

7 '5

rk.,rui~ T,1

1 5 9 5

.1

,

,

'r'1?-111_1

t,_-:.-2.-

3. 3 .5

riMi Z

r

■IIIM~I.~a~

0

INN MINN M M..=I rionvil Pu MN MIMI= NMI M

rI 'AT

I' I -1 'r!

1 5 7 0 ,

-1 '5.

-1 .5.

8 5

8 0

‘rfc' r

1 5 9 0

,

Py)'1•

',ti J . , f ,}

I 5 4 5

-1 1- . 5 5 -0

-1 .5. 5 '5

1 5 6 0

1 5 6 5

— Groupe de Beekmantown

é o 0

1 6 0 5

-1 .6.

•0

4------s— MI= — .-- — — --- — --- I— ---NB — --- — — — ------ -- OM INN

- — — --- MINI= 1-- — INN---

— ---- MM ION 111111•11104 MO -- — ----- --rs — --- — -- - Is s s-- ON ME s— — — —

Mo— — — -- — — — Mi.= On .5--- — --- — -- — • ----------

r [sss---sas---______s___ — — I— ----- — — ---- ---rrl--- =1.111111=M•000 ,1=

• ----------- O—ME-- — -- NM MN =I

-- ---- --- — — ---- — —

- - -- ---- - — -- — — -- -

• — — --- — ---- - — CO

MI FRAM i—T.UM—ss--s— '— ---- -- --- MI= --- -- ---

---- — PP I= — -s--s--- I--- — — MN MI r— AM— — s-- ss-- s— I---

L I - I D 1~I l

4 -1-14

•1 6, 1 •5

1 62+ 0

~-- L [ I

lti ~ t

1 6, 5 5

6

l'r t

~ r

L

I ` r [ IJ I

L

I

•1 .6.

5

1 6 4 0

1 6 4 5

•1 .6. 5 .0

I i i `l I I

[ ~T I 1

----~~ —

MN =I --

I ~ i

6 0

I I I

6 2 5

•1

•0.

f~

J77J l JJ_'IJJJ/J

_ BMW. :..s.a JAO.Mir rttiltr~~~~s~iR~t

~.-.

ArrAgdringer

~

,ldltfdrer

fr

-1 .6.

-1 6 9 '0

•1 6 9

1 7.

5

8 .5

7

°0

.1

-5

•1 6 7

`7' '5

-1 .6, 8 -o

'0

-1 6

— Carotte no-9, et 10, dolomie C, 1672-1687,25 mkb voir description section carottage

- Groupe de Beekmantown

- Fin du puits de SOQUIP St-Flavien no-8, profondeur totale de 1717 mkb

SOQUIP ST-FLAVIEN NO 8

RÉSULTATS

DES ESSAIS AUX TIGES

LYNES INTERIM DATACAP DST REPORT

trY

WELL NAME: SOQUIP ST FLAVIEN #8 DST# 1 BOT# 1 1479.00 m FORMATION: BEEN AN TOWN TESTER NAME: KEN MATHEWSON

FIELD READINGS kPa

LOCATION: 91FA215 TO 1496.00 m KB _ 143.55 m

TEST TYPE: CONV BOTTOM HOLE UNIT NUMBER: 890490

ELECTRONIC READINGS kPa(a)

REC NO 8892

DMR NO. : 2004 DEPTH : 1485.00 m

DEPTH 1485.00 m LOCATION: OUTSIDE

TIMES

LOCATION: OUTSIDE

1) INITIAL HYDRO : 16811. 16750. 2) 1st FLOW START: 4776. 3) 1st FLOW END 2462. 4.0 2448. 4) END 1st SKUTIN: 7994. 58.0 8043. 5) 2nd FLOW START: 1332. 4858. 6) 2nd PLOW END : 2155. 86.0 2216. 7) END 2nd SHUTIN: 9122. 225.0 9216.

14) FINAL HYDRO : 16811. 16741.

BLOW DESCRIPTION:

PF.S.A.B,G.T.S IN 30 SEC. SRONG THROUGH OUT. 2.5M FLAME. FF. S.A.B, G.T.S DECREASING AFTER 20 MIN. STRONG THROUGH OUT.

CUSHION: NO TYPE: AMOUNT: 0. m FIELD ESTIMATED

TOTAL RECOVERY: 81.00 m REVERSE CIRCULATED: NO SALINITY: 00 q/

81.00 m of DRILLING MUD

r MEAS .'REM _N'TS' (SEE ATTACHED PAGE FOR MEASUREMENTS)

DP OD: 114.0 min DC ID: 73.00 min LENGTH: 139.79 m MAIN HOLE: 222.00 MM

REMARKS THE RESULTS INDICATE A MECHANICALLY SUCCESSFUL TEST. THE SHAPE OF THE SHUT-IN CURVES AND RELATED PRESSURE DATA SUGGEST LOW PERM, WINTIN THE TESTED INTERVAL.

BAKER OIL TOOLS CANADA PAGE :.

pSTO 1 SOQUIP ST FLAVIEN #8

1479.00 m to 1496.00 M

GAS MEASUREMENTS

MEASURED WITH: CRITICAL FLOW PROVER

TIME

SURFACE CHOKE (mm)

SURFACE PRESSURE (kPa)

GAS RATE (m3 /day)

10 12.70 760. 19858. 20 12.70 520. 14209. 30 12.70 360. 10462. 40 12.70 200. 6729. 50 3.18 300. 561. 60 3.18 560. 938. 70 3.18 700. 1142. 80 3.18 860. 1375. 90 1.18 860. 1375.

BAKER OIL TOOLS CANADA PAGE la

DST# 1 SOQUIP ST FLAVIEN 08

1479.00 m to 1496.00 m

Location: 91FA215 Test Type: CONV BOTTOM HOLE Formation: BEEKMAN TOWN

Recorder Number: 2004 Recorder Depth: 1485.00 m SUBSEA DEPTH: -1341.45 m

TIME-PRESSURE LISTING

CHART LABEL COMMENTS

1 INITIAL HYDROSTATIC

TIME MIN.

DELTA P kPe

PRESSURE kPa(a)

16750.

(T+dt)/dt ABSCISSA

PRESSURE SQUARED

k2a(s)_2/10"6

2 START OF 1st FLOW .0 4776.

1.0 3647. 2.0 3000. 3.0 2672.

3 END OF 1st FLOW 4.0 2448.

1st SHUTIN PERIOD .0 2448.

2.0 1586. 4035. 3.0000 16.2772 5.0 2483. 4931. 1.8000 24.3148 7.0 2802. 5250. 1.5714 27.5625 9.0 3043. 5491. 1.4444 30.1555 12.0 3328. 5776. 1.3333 33.3610 14.0 3483. 5931. 1d2857 35.1768 16.0 3629. 6078. 1.2500 36.9372 18.0 3767. 6216. 1.2222 38,6324 21.0 3948. 6397. 1.1905 •.0.9165 23.0 4069. 6517. 1.1739 42.4739 25.0 4190. 6638. 1. 16UU 44.061'/ 28.0 4345. 6793. 1.1429 46.3.462 30.0 4448. 6897. 1.1333 47.5637 32.0 4543. 6991. 1.1250 48.8797 34.0 4638. 7086. 1.1176 50.2142 37,0 4776. 7224. 1.1081 52.1876 39.0 4871. 7319. 1.1026 53,5678 41.0 4957. 7405. 1.0976 54.8370 44.0 5078. 7526. 1.0909 56.6392 46.0 5155. 7603. 1.0870 57.8117 48.0 5233. 7681. 1.0833 58.9978 50.0 5310. 7759. 1.0800 60.1959 53.0 5422. 7871. 1.0755 61.9479 55.0 5491. 7940. 1.0727 63.0388 57.0 5560. 8009. 1.0702 64.1377

4 END OF 1st SHUTIN 58.0 5595. 8043. 1.0690 64.6915

5 START OF 2nd FLOW .0 4888.

2.0 4086.

BAKER OIL TOOLS CANADA PAGE 2

DST# 1 SOQUIP ST FLAVIEN #8

1479.00 m to 1496.00 m

Location: 91FA2 ].5 Test Type: CONV BOTTOM HOLE Formation: BEEKMAN TOWN

Recorder Number: 2004 Recorder Depth: 1485.00 m SUBSEA DEPTH: -1341.45 m

TIME-PRESSURE LISTING

CHART LABEL COMMENTS

TIME MIN.

DELTA P kPa

PRESSURE kPa(a)

(T+dt)/dt ABSCISSA

PRESSURE SQUARED

kPa(a)^2/1046

5.0 233. 7.4 2819. 9.0 2500. 12.0 2147. 14.0 1983. 16,0 1853. 18.0 1741. 21.0 1629. 23.0 1569. 25.0 1526. 28.0 1474. 30.0 1431. 32.0 1397. 34.0 1371. 37.0 1353. 39.0 1336. 41.0 1328. 44.0 1293. 46.0 1345. 48.0 1422. 50.0 1491. 53.0 1578. 55.0 1629. 57.0 1631. 60.0 3,750. 62.0 1793. 64.0 1836. 66.0 1871. 69.0 1931. 71.0 1974. 73.0 2009. 76.0 2060. 78.0 2095. 80.0 2121. 82.0 2155. 85.0 2198.

6 END OF 2nd FLOW 86.0 2216.

grid SHUTIN PERIOD 0 2216.

4.0 509. 2724. 23.5000 7.4207 9.0 905. 3121. 11.0000 9.7388 14.0 1250. 3466. 7.4286 12.0097

BAKER OIL TOOLS CANADA PAGE

DST# 1 SOQUIP ST FLAVIEN #8

1479.00 m to 1496.00 m

Location: 91FA23.5

Recorder Number: 2004 Test Type: CONV BOTTOM HOLE

Recorder Depth: 1485.00 m Format ion : BEEKMAN TOWN

SUBSEA DEPTH: -1341.45 m

TIME-PRESSURE LISTING

CHART TIME LABEL COMMENTS MIN.

DELTA P kPa

PRESSURE kPa(a)

(T+oit) /dt ABSCISSA

PRESSURE SQUARED

kPa(a)"2/10"6

18.0 1509. 3724. 6.0000 13.8689 23.0 1810. 4026. 4.9130 16.2079 27,0 2043. 4259. 4.3333 18.1357 32.0 2310. 4526. 3.8125 20.4838 36.0 2526. 4741. 3.5000 22.4809 41.0 2776. 4991. 3.1951 24.9141 46.0 3026. 5241. 2.9565 27.4723 50.0 3216. 5431. 2.8000 29.4958 55.0 3440. 5655. 2.6364 31.9813 59.0 3612. 5828. 2.5254 33.9609 64.0 3810. 6026. 2.4063 36.3115 68.0 3966. 6181. . 2.3235 38.2048 73.0 4155. 6371,. 2.2329 40.5858 78.0 4336. 6552. 2.1538 42.9248 82.0 4474. 6690. 2.0976 44.7521 87.0 4638. 6853. 2.0345 46.9691 91.0 4767. 6983. 1.9890 48.7595 96.0 4914. 7129. 1.9375 50.8269 100.0 5026. 7241. 1.9000 52.4379 105.0 5164, 7379. 1.8571 54.4541 110.0 5293. 7509. 1.8182 56.3791 114.0 5397. 7612. 1,7895 57.9441 119.0 5517. 7733. 1.756; 59.7962 123.0 5604, 7819. 1.7217 61.1368 128.0 5716. 7931. 1.7031 62.9008 132.0 5793. 8009. 1.6818 64.1377 137.0 5897. 8112. 1.6569 65.8062 142.0 5991. 8207. 1.6338 67.3532 146.0 6069. 8285. 1.6164 68,6329 151.0 6147. 8362. 1.5960 69.9247 155.0 6216. 8431. 1,5806 71.0818 160.0 6293. 8509. 1.5625 72.3963 164.0 6354. 8569. 1.5488 73.4278 169.0 6422. 8638. 1.5325 74.6133 174.0 6483. 8698. 1.5172 75.6604 178.0 6543. 8759. 1.5056 76.7131 183.0 6604. 8819. 1.4918 77.7748 187.0 6647. 8862. 1.4813 78.5368 192.0 6698. 8914. 1.4688 79.4558 196.0 6741. 8957. 1.4592 80.2261 201.0 6793. 9009. 1.4473 81. 1549 206.0 6836. 9052. 1.4369 81.9333 210.0 6871. 9086. 1.4286 82.5590 215.0 6922. 9138. 1.4186 83.5012

BAKER OIL TOOLS CANADA PAGE 4

DSTi 1 SOQUIP ST FLAVIEN 08

1479.00 m to 1496.00 m

Location: 91FA215

Recorder Number: 2004 Tast Type: CONV BOTTOM HOLE

Recorder Depth: 1485.00 m Formation: BEEKMAN TOWN

SUBSEA DEPTH: -1341.45 m

TIME-PRESSURE LISTING

CHART TIME DELTA P PRESSURE (T+dt)/dt PRESSURE LABEL COMMENTS MIN. kPa kPa(a) ABSCISSA SQUARED

kPa(a)"2/10"6

219.0 6948. 9164. 1.4110 83.9753 224.0 6991. 9207. 1,4018 84.7670

7 END OF 2nd SHUTIN 225.0 7000. 9216. 1.4000 84.9254

14 FINAL HYDROSTATIC 16741.

BAKER OIL TOOLS CANADA PAGE 5

G'9C DS '91 ,UJ I{~+ i.

05 '82 04 'S2 OS '22 '6t CS 'Et a .w

c7

tia.~.Iw w w ~ tli r— N

CO ~ "I GO

M

a~ N R1 "9. I!I fG f+ ~

LE

GE

ND

: 0

Q

CO LI.J ' # Qti

~

7: LIJ

L.~...~

'00081 '00051 '00021 170015 '0099

( o n 8)1 ~ ~uf1SS3~d

1

SU•0 91600 t/ t Cgx "`' dA 1 zti,a5.tdd

•Sg SL 'SL► 'SC

*++ t+++

'S 'SZ 'GI

kn

az 'CT

Sd+J :PtotUI/ IC.M* "dhl ot]11:]J'GO Tt cy 9, -Cr 'nC

t + + ++ + ++

T

LYNES INTERIM DATACAP DST REPORT

WELL NAME: SOQUIP ST FLAVIEN !6 DST# 2 BQT# 2 1514.00 m FORMATION: DOLOMIE TESTER NAME: KEN MATHEWSON

FIELD READINGS kPa

LOCATION: 91FA215 TO 2540.00 m KB a 143.55 m

TEST TYPE: CONV BOTTOM HOLE UNIT NUMBER: 890490

ELECTRONIC READINGS kPa(a)

REC NO : 8892

DMR No. : 2004 DEPTH : 1519.00 m

DEPTH 1519.00 m LOCATION: OUTSIDE

TIMES

LOCATION: OUTSIDE

1) INITIAL HYDRO : 16914. 16759. 2) 1st FLOW START: 512. 422. 3) 1st FLOW END : 512. 14,0 526. 4) END 1st SHUTIN: 1947. 59.0 1897. 5) 2nd FLOW START: 614. 638. 6 ) 2nd FLOW END : 717. 86.0 724. 7) END 2nd SHUTIN: 5435. 226.0 5457. 14) FINAL HYDRO : 16914. 16698.

BLOW QESCRIFTION:

PF. W.A.B INCREASING SLIGHTLY THROUGH OUT. N.G.T.S FF. WEAK TO STRONG IN 1 MIN. INCREASING SLIGHTLY. STRONG THROUGHT OUT. N.G.T.S.

CUSHION: NO TYPE: AMOUNT: 0. to FIELD ESTIMATED SALINITY: .0 r/m3 TOTAL RECOVERY: 28.00 m REVERSE CIRCULATED: NO

28.00 m of DRILLING MUD

GAS MEASUREMENTE' NO

DP OD: 114.0 mm DC ID: 73.00 mm LENGTH: 139.79

REMARKS

a MAIN HOLE: 222.00 mm

RESULTS INDICATE A MECHANICALLY SUCCESSFUL TEST. RESULTS SUGGEST LOW PERMEABILITY. THE RESULTS ALSO SUGGEST FORMATION DAMAGE- THE INITIAL SHUT--IN WAS NOT EXTRAPOLATED DUE TO INSUFFICIENT CURVE DEVELOPMENT.

BAKER OIL TOOLS CANADA PLACER C£ BORD EN PREMIER OANS LA MACHINE

~ télécopier 1 tn4-0- .$'O Civ/ r

PAGE '

OST# 2 SOQUIP ST FLAVIEN #8

1514.00 m to 1540.00 m

4ocation: 91FA215 Cast Type: CONY BOTTOM HOLE l'ormatian: DOLOMIE B

Recorder Number: 2004 Recorder Depth: 1519.00 m SUBSEA DEPTH: -1375.45 m

TIME-PRESSURE LISTING

.'HART :.ABEL COMMENTS

1 INITIAL HYDROSTATIC

TIME MIN.

DELTA P kPa

PRESSURE kPa(a)

16759.

(T+dt)/dt ABSCISSA

PRESSURE SQUARED

kPa(a) "2110"6

2 START OF 1st FLOW .0 422.

1.0 440. 2.0 457. 4.0 474. 5.0 483. 6.0 491. 7.0 500. 8.0 509. 9.0 509. 10.0 517. 12.0 535. 13.0 535.

3 END OF 1st FLOW 14.0 526.

1st SHUTIN PERIOD .0 526.

2.0 52. 578. 8.0000 .3336 4.0 95. 621. 4.5000 .3853 7.0 155. 681. 3.0000 .4638 9.0 198. 724. 2.5556 .5243 11.0 233. 759. 2.2727 .5755 14.0 284. 810. 2.0000 .6566 16.0 319. 845. 1.8750 .7137 18.0 362. 888. 1.7778 .7884 20.0 397. 922. 1.7000 .8508 23.0 457. 983. 1.6087 .9659 25.0 500. 1026. 1.5600 1.0525 27.0 543. 1069. 1.5185 1.1428 30.0 603. 1129. 1.4667 1.2753 32.0 646. 1172. 1.4375 1.3745 34.0 690. 1216. 1.4118 1.4774 36.0 741. 1267. 1.3889 1.6058 39.0 810. 1336. 1.3590 1.7854 41.0 862. 1388. 1.3415 1.9263 43.0 914. 1440. 1.3256 2.0727 46,0 991. 1517. 1.3043 2.3019 48.0 1043. 1569. 1.2917 2.4618 50.0 1103. 1629. 1.2800 2.6546 52.0 1155. 1681. 1.2692 2.8258

BAKER OIL TOOLS CANADA PAGE 2

DST', 2 SOQUIP ST FLAVIEN #8

1514.00 m to 1540.00 m

Location: 91FA215 rest Type: CONV BOTTOM HOLE Fermatlon: DOLOMIE B

Recorder Number: 2004 Recorder Depth: 1519.00 m SUBSEA DEPTH: -1375.45 m

TIME-PRESSURE LISTING

CHART LABEL COMMENTS

TIME MIN.

55.0 57.0

DELTA P kPa

1250. 1310.

PRESSURE kPa(a)

1776. 1836.

(T+dt)/dt ABSCISSA

1.2545 1.2456

PRESSURE SQUARED

kPa(a)"2/10"6

3.1538 3.3716

4 END OF 1st SHUTIN 59.0 1371. 1897. 1.2373 3.5971

5 START OF 2nd FLOW .0 638.

2.0 638. 4.0 647. 6.0 647. 9.0 647. 11.0 647. 13.0 655. 26.0 655. 18.0 564. 20.0 664. 22.0 654. 25.0 664. 27.0 664. 29.0 664. 32.0 672. 34.0 672. 36.0 672. 38.0 681. 41.0 681. 43.0 681. 45.0 690. 48.0 690. 50.0 690. 52.0 698. 54.0 698. 57.0 690. 59.0 698. 61.0 698. 64.0 707. 66.0 707. 68.0 707. 70.0 716. 73.0 716. 75.0 716. 77.0 724. 80.0 724. 82.0 724. 84.0 724.

BAKER OIL TOOLS CANADA PAGE 3

DSTO 2 SOQUIP ST FLAVIEN ~8

1514.00 m to 1540.00 zn

.acation: 91FA215

Recorder Number: 2004 Pest Type: CONV BOTTOM HOLE

Recorder Depth: 1519.00 m Formation; DOLOMIE 8

SUBSEA DEPTH; -1375.45 m

TINTE-PRESSURE LISTING

:HART TIME :.ABEL COMMENTS MIN.

6 END OF 2nd FLOW 86.0

2nd SHUTIN PERIOD .0

DELTA P kPa

PRESSURE kPa(a)

724.

724.

(T+dt)/dt ABSCISSA

PRESSURE SQUARED

kPa(a)"2/10'6

5.0 267. 991. 21.0000 .9829 10.0 638. 1362. 11.0000 1.8553 14.0 940. 1664. 8.1429 2.7682 19.0 1310. 2035. 6.2632 4.1392 23.0 1604. 2328. 5.3478 5.4177 28.0 1974. 2698. 4.5714 7.2808 32.0 2267. 2991. 4.1250 8.9485 37.0 2612. 3336. 3.7027 11.1302 42.0 2957. 3681. 3.3810 13.5498 46.0 3224. 3948. 3.1739 15.5891 51.0 3526. 4250. 2.9608 18.0625 55.0 3750. 4474. 2.8182 20.0176 60.0 3983. 4707. 2.6667 22.1549 64.0 4138. 4862. 2.5625 23.6400 69.0 4285. 5009. 2.4493 25.0861 74.0 4388. 513.2. 2.3514 26.7.336 78.0 4448. 5172. 2.2821 26.7537 83.0 4500. 5224. 2.2048 27.2912 87.0 4525. 5250. 2.1454 27.5C2S 92.0 4560. 5285. 2.0870 27.9259 96.0 4578. 5302. 2.0417 28.1.080 101.0 4604. 5328. 1.9901 26.3833 106.0 4621. 5345. 1.9434 28.5669 110.0 4629. 5353. 1.9091 28.6589 115.0 4638. 5362. 1.8696 28.7521 119.0 4655. 5379. 1.8403 28.9369 124.0 4664. 5388. 1.8065 29.0295 128.0 4673. 5397. 1.7813 29.1233 133.0 4673. 5397. 1.7519 29.1233 3.38.0 4681. 5405. 1.7246 29.2162 142.0 4681. 5405. 1.7042 29.2162 147.0 4690. 5414. 1.6803 29.3092 151.0 4698. 5422. 1.6623 29.4024 156.0 4698. 5422. 1.6410 29.4024 160.0 4698. 5422. 1.6250 29.4024 165.0 4707. 5431. 1.6061 29.4958 170.0 4716. 5440. 1.5882 29.5903 174.0 4716. 5440. 1.5747 29.5903 179.0 4716. 5440. 1.5587 29.5903

FAKER OIL TOOLS CANADA PAGE 4

DST# 2 SOQUIP ST FLAVIEN 18

1514.00 m to 1540.00 m

'.ocation : 91FA215 Nast Type: cONV BOTTOM HOLE 'ormation: DOLOMIE B

Recorder Number: 2004 Recorder Depths 153.9.00 m SUBSEA DEPTH: -1375.45 m

TIME-PRESSURE LISTING

"MART .ABEL COMMENTS

TIME MIN.

DELTA P kPa

PRESSURE kPa(a)

(T+dt)/dt ABSCISSA

PRESSURE SQUARED

kPa(a)•2/10"6

183.0 4716. 5440. 1.5464 29.5903 188.0 4724. 5448. 1.5319* 29.6840 192.0 4724. 5446. 1.5208* 29.6840 197.0 4733. 5457. 1.5076* 29.7778 202.0 4724. 5448. 1.4950* 29.6840 206.0 4733. 5457. 1.4854* 29.7778 27.1.0 4733. 5457. 1.4739* 29.7778 215.0 4733. 5457. 1.4651* 29.7778 220.0 4733. 5457. 1.4545* 29.7778 224.0 4733. 5457. 1.4464* 25.7778

7 END OF 2nd SHUTIN 226,0 4733. 5457. 1.4425* 29.7778 44) how

14 FINAL HYDROSTATIC 16698.

* DENOTES VALUES USED FOR EXTRAPOLATION

2 nd SHUT-IN HORNER EXTRAPOLATION 5511.74 kPa(a) HORNER SLOPE

3.68506 (kPa(a)**2/10**6)/cycle

BAKER OIL TOOLS CANADA PAGE 5

~ 'Li 'VC 'IL 'aI 'Si 'el , .

LE

GE

ND

: O

ai . P.

I`. N ff1C1J>, wr:11tA ecs

~ iJ7 ~

F l.? N 10

.-. N t►1 `r l r

N

7 r r T T ~ 'o0Qii l 'NOSt '000it '0006 '0o06

[ ° d 1 S d

.0

0P 'c 00'6 da 't , OL'L Ga•t L ûf'1 ao.1 as •o ►i o'

+ + + + + + + + + 0

+ * + *

+ +,

+ + t

+ " ~ »

+

+

OP -- 0

- ,10.- - r

_

+

', . " 1

.--, -- —

.. . - -

a b -

I i

.- - —

1

-.r

II Z

~ --~ . =3 t . , -

' ~

.

IT. E ~ ~ a. u —+ w = 6 a ~ o N s

II F-

.

.

N OM

/ ''''''r'''.....T.... ' ,' M1 r • • .

[ Ti -d

T) /d

T

ç

~

N i

Pi

~

+

r

.-.. ~ C3 • 4 .

--T . -

70. 24. 28.

P9E551JAE f kP a s acx2 l/ l 0xm6 GRS

32-

i

B• H11

1teJ

14

15 dif

1OO

S

LYNES INTERIM DATACAP DST REPORT

WELL NAME: SOQUIP ST FLAVIEN #8 DST# 3 SOT# 3 1669.00 m FORMATION: DOLOMIE C TESTER NAME: KEN MATHEWSON

FIELD READINGS kPâ

LOCATION: 91FA215 TO 1717.00 m KB = 143.55 m

TEST TYPE: CONY BOTTOM HOLE UNIT NUMBER: 890490

ELECTRONIC READINGS kPa(a)

REC NO 8892

DMR NO. : 2004 DEPTH : 1673.00 m

DEPTH : 1673.00 m LOCATION: OUTSIDE

TIMES

LOCATION: OUTSIDE

1) INITIAL HYDRO : 18554. 18552. 2) 1st FLOW START: 412. 535. 3) 1st FLAW END ; 412. 9.0 526. 4) END 1st SHUTIN: 3484. 58.0 3586. 5) 2nd FLOW START: 412. 569. 6) 2nd FLOW END 614. 86.0 603. 7) END 2nd SHUTIN: 7280. 232.0 7422.

14) FINAL HYDRO : 18349. 18293.

SLOW DESCRIPTION:

WEAK TO STRONG IN 3 MIN INCREASING SLIGHTL`! TTHROUGH OUT. NGTS. FF. WEAK TO STRONG IN 1 MIN . STRONG THROUGH OUT NGTS,

CUSHION: NO TYPE:

AMOUNT: 0. m FIELD ESTIMATED

TOTAL RECOVERY: 19.00 m

REVERSE CIRCULATED: NO SALINITY: .0 g/m3

19.00 m of DRILLING MUD

GAS MEASUREMENTS: N0

DP OD: 114.0 mm DC ID; 73.00 mm LENGTH: 101.66 m MAIN HOLE: 222.00 mm

REMARKS

MECHANICALLY SUCCESSFUL TEST. RESULTS SUGGEST VERY LOW PERMEABILITY. THE SHUT-INS WERE NOT EXTRAPOLATED DUE TO INSUFFICIENT CURVE DEVELOPMENT.

BAKER OIL TOOLS CANADA PAGE

DSTO 3 sOQUZP ST F'LAVIEN #8

1669.00 m to 1717.00 m

Location: 91FA215 Test Type: CONY BOTTOM HOLE Formation: DOLOMIE C

Recorder Number: 2004 Recorder Depth: 1673.00 m SUBSEA DEPTH: -1529.45 m

CHART LABEL COMMENTS

1 INITIAL HYDROSTATIC

2 START OF 1st FLOW

TIME-PRESSURE LISTING

TIME DELTA P PRESSURE MIN. kPa kPa(a)

18552.

.0 535.

1.0 535.

2.0 526.

3.0 526.

4.0 517,

6.0 517.

7.0 526.

8.0 517.

(Ttdt)/dt. ABSCISSA

3 END OF 1st FLOW 9.0 526.

1st SHUTIN PERIOD .0 526.

2.0 129. 655. 5.5000 5.0 328. 853. 2.8000 7.0 448. 974. 2.2857 9.0 569. 1095. 2.0000 11.0 690. 1216. 1.8182 14.0 879. 1405. 1.6429 16.0 1009. 1535. 1.5625 19.0 1129. 1655. 1.5000 21.0 1302. 1828. 1.4286 23.0 1422. 1948. 1.3913 25,0 1534. 2060. 1.3600 27.0 1638. 2164. 1.3333 30.0 1793. 2319. 1.3000 32.0 1897. 2422. 1.2813 34.0 2000. 2526. 1.2647 37.0 2147. 2672. 1.2432 39.0 2241. 2767. 1.2308 41,0 2328. 2853. 1.2195 43.0 2422. 2948. 1.2093 46.0 2560. 3086, 1.1957 48.0 2638. 3164. 1.1675 50.0 2724. 3250. 1.1800 53.0 2853. 3379. 1.1698 55.0 2940. 3466. 1.1636 57.0 3017. 3543. 1.1579

4 END OF 1st SHUTIN 58.0 3060. 3586. 1.1552

BAKER OIL TOOLS CANADA PAGE 2

DSTO 3 SOQUIP ST PLAVIEN #8

1669.00 m to 1717.00 m

Location: 91FA215 Test Type: CONV BOTTOM HOLE Formation: DOLOMIE C

Recorder Number: 2004 Recorder Depth: 1673.00 m SUBSEA DEPTH: -1529.45 m

TIME-PRESSURE LISTING

CHART LABEL COMMENTS

TIME MIN.

DELTA P kPa

FRESSURE kPa(a)

(T+dt)/dt ABSCISSA

START OF 2nd FLOW .0 569.

3.0 612. 6.0 603. 10.0 612. 13.0 603. 17.0 612. 20.0 612. 24.0 612. 27.0 603. 30.0 612. 34.0 612. 37.0 612. 41.0 612. 44.0 612. 48.0 512. 51.0 612. 54.0 603. 58.0 603. 61.0 603. 65.0 603. 68.0 603. 72 C 612. 75.0 612. 78.0 612. 82.0 603, 85.0 612.

6 END OF 2nd FLOW 86.0 603.

2nd SHUTIN PERIOD .0 603.

6.0 224, 828. '16.8333 12.0 517. 1121. 8.9167 18.0 810. 1414. 6.2776 23.0 1035. 1638. 5.1304 29,0 1310. 1914. 4.2759 35.0 1578, 2181. 3.7143 40.0 1793. 239'1. 3.3750 46.0 2052. 2655. 3.0652 52.0 2302. 2905. 2.8269 58.0 2543. 3147. 2.6379 63.0 2741. 3345. 2.5079

BAKER OIL TOOLS CANADA PAGE 3

DST# 3 S4QUIP ST FLAVIEN 18

1669.00 m to 1717.00 zn

Location: 91FA215 Test Type: CONV BOTTOM HOLE Formation: DOLOMIE C

Recorder Number: 2004 Recorder Depth: 1673.00 m SUBSEA DEPTH: -1529.45 m

CHART LABEL COMMENTS

TIME-PRESSURE LISTING

TIME DELTA P PRESSURE MIN. kPa kPa(a)

(T+dt)/dt ABSCISSA

59.0 2966. 3569. 2.3768 75.0 3190. 3793. 2.2667 80.0 3371. 3974. 2.1875 86.0 3578. 4181. Z.1047 92.0 3776. 4379. 2.0326 98.0 3966. 4569. 1.9694 103.0 4129. 4733. 1.9223 109.0 4302. 4905. 1.8716 115.0 4474. 5076. 1.8261 120.0 461.2. 5216. 1.7917 126.0 4785. 5388. 1.7540 132.0 4940. 5543. 1.7197 138.0 5095. 5698. 1. 6884 143.0 5224. 5828. 1.6643 149.0 5362. 5966. 1.6376 155.0 5491. 6095. 1.6129 160.0 5612. 6216. 1.5938 166.0 5733. 633;. 1.5723 172.0 5862. 6466. 1.5523 178.0 5974. 6578. 1.5337 183.0 6069. 6672. 1.5191 189.0 6181. 6785. 1.5026 195.0 6285. 6888. 1.4872 200.0 6162. 6966. 1.4750 20g.0 6457. 7060. 1.4612 212.0 6543. 7147. 1.4481 218.0 6629. 7233. 1.4358 223.0 6690. 7293. 1.4260 229.0 6776. 7379. 1.4148

7 END OF 2nd SHUTIN 232.0 6819. 7422. 1.4095

14 FINAL HYDROSTATIC 18293.

BAKER OIL TOOLS CANADA

PAGE 4

6

~

A7

Q

uJ

.J

M v

-+ N .1 1 !7 r ~

N ti

LESE

tiQ

: O

CS 'ti6 09''.E Id .r 4146+• .d •

V'. la OS'SZ OS'ZZ OS 'RE OS 'SI OS 'Gi c; m

d

N WI . N . :Q t

N C1 N P ~p Ci T ~

. +1 N N

a7 N IA L•] O .1. CO ►• :PI N th u1 fA t" --' -1

'000 ? '0006 t

aoas~ 'ooczz 'O1:06 'Qa05 'OQDI:

'0 ( ° '° d.4 ) 3df~SS3dd

11 11lÜ1 I klJlo " ` C~ ► ~b~i5;~~âd

'Sf 'CZE 'CUZ 'crz 'CCz '091 'OZI -C9 "Cf

+ } .F .}, .4. + + 4.

} + }

+ +

+ ' +

+

+

..

11111111111111111-11111111111111•11_

.

~

SDLI

lt1 1' S

T FL

pYI E

Ta

WB

91

FH21

S

DST

. 3 F

i EC

- 20

04

S

HIII

Iu4,

1

I I

1

l , . .

~ . i r 7 A 1 A

Ti -d

T3rd

T

t_ .

~ ♦ ~ ci N

~

V W Q

U = C rn n ~ - . fD .-- cn N -II --& 0 I? o N RI r ol• .-. r

if ss

r v) n S z C -.4 •

LO Y, r

N

.

+

~ }

' 1

} I ~~

I

- ~ ~. ♦ .—

+

+ +

+ i î

+ T +

+ +

+ +

T

- 1 .

* * ~ t

T +++ } +++

~ T' lT'

4.44+4

.

I

35R. 4=JO. 5 50. riJO. 75C.

PRESSURE (k.Pa a m10) LIQUID • 1r -r, -1; 4-4,I , *- 77 _ 5O. 25C. •

LYNP3 l. NTT!:•F: ( M uA re][.1aF• DS'r hEEF'UF: r

WELL NAME: i3►ï)I:IV I rST F'LAV I E.N M~3

LOCATION: 91. A7 1n 1J51 ak 4 BOTtt 4

1470.0 m. TO 1490.0 m. FORMATION: i7oLC1M I 'Tlr: b

TEST TYPE: CONV STRADDLE TESTER NAME: k:E,'N h1A THt W'.3C:N

TEST DATE:

REE: NO . vim REc`N7 , : 2004 1)EF'1'hf : 1474,0,) m. DEPTH : 1474.00 m. LOCATION: E3UT5IE)Iw TIMES L1JrATIC]N: OUTSIDE

FIELD RKAI)1 NGS kPa ELECTRONIC READINGS k F~a ( a)

1?InitY31 Hydr►apt.atir_: 16501,0 16353.4 L)Stx+rt of 1 ,t, Flow : 1939.7 S)Er,d of 1st Flow : 1944.0 ÿ.0 175E3.6 4)Fnd of 1-t Shut.-.1n : 5742.0 67.0 5974.1 *)Start of 2nd Flow . 164"•1.0 1E353.4 b)End of 2nd F"1ow ti :.0154.0 1:3.t) 2:75.9 7) End of 2nd F.)Fiuti--1r. : 9326.0 S57.0 9939.7

14)Fina.l HydrastAt'1r_ : J.faa(}j..+. ► 16224.1

kjI.. UW EyE.•=wCT-;IF'I It:1N:

WEAK 10 51'Rflh1G IN 10 kif.l.:. ïNL'T";Eria.71'Nû THROUGH OUT. GTt3 IN 3 MIN FF. ;i1Ttf.)NLi AIR iil_ 1zW INCfF+.E FiT;3INrs t3L t0HTt.,Y THROUGH OUT. L3Tw ON VALVE OPEN

CUSHION: NU r Y1a E: : AMOUNT: 0.0 m .

FIELU ESTIMATED T(1f'AI_ RECOVERY: 101,c!+' m. FiE::VEEZâ CIRCULATED: NO SALINITY: Q/m:3

73.00 m. of GASIFIED MUD 23.00 m. o•t WATER LUT MUD

C;4W Mi';l'.f:YF,E:Pnr..nE•TS. YET fr;Ei'; A-E• i'At:FiF:I;► NAG FOR MEASUREMENTS)

L11•' OD: 114. nun . DC: ID: 73.00 mm. LENGTH: 129.1 m. MAIN HOLE: 222.00 mm.

REMARKS

MECHANICALLY SUCCESSFUL TEST. Rï'<~~11L_ 1;j SUGGEST LUW ER;MCAB IL. I Î Y. THE SHUT-INS wF~FE MIT EXT1'.AF'OLATE...h I)fJE: TO ItdSI.II-F"1L:IF- NT CURVE DEVELOPMENT.

TU OIS 5 f".HNAL)#i PAGE: 1

°iin~~r

Q~ Q O F~ m gi .+a~.r .s n

z

wNRi~Y1bt~~

vvân =en =IC= ~ ~~~ti~

Pages 2

oef #: 4 SQUUIR eLAvIEN #O 1470.0 m. - 1490,0 m.

GAS MEASURFMENI *#■*,a** ■■$*****

R15er, 0.00 mm. Bomb #: Sent to:

cHOkE imM.} READING(kPa(a)) M3.zdok¥

3.1/§ 160.00 451.0

3.175 190.00 508,0

3.175 240.00 595.0

5.175 300.00 697.0 3,17n a20,00 752.0

3.175 340,00 770,0

3.175 360.00 eÙ5.0

7.3.17~ 580.00 838.0

I.17n 400.00 874.0

3.175 410.00 893,0 3.175 420,00 909.0

1!,t75 430,00 928.0

FLoQ # IIME (min)

2 10.00

2 20,00 30,00

2 40.00

2 50.00

2 60.00

2 70.00

2 80.00

2 90:'

2 100.0@

2 110.00 2 î20.m0

DST #: 4 SOG}LJ I f' ST 1' LAV i k:N ##S 147r4.t7 ,n. - 149t;).0 tn.

Paget x

Locrir+n: 91FA215

Ret:c)rdear Number; 2004 f es t Typ a CONY S'TRAUf)L1:'

ReCorrier Depth: 1474 m. - Formation: 11C]L.EIMI11,- F:)

TIME-FRESSURE LISTINI3

l'[14RT TIME DELTA P F'RES:+IJF':k. ('l'4-dt)/dL PRESSURE LABEL CLJMMENI"N MIN. N'.Pa.( a) kPa ( at ) AF1SCIS3A SQUARED

F;Pa ( a }''•d/ 10''6

1 Iri.i.h.i..al HyrJrqSt'ar.tt_: 0.0t:)0 16353.4

2;3 t: a r t of 1;t Flow t•j .000 1y39.7

FLOW F'C::F;IC.11J 1 1.000 -155.2 .1764.5 2.000 -181.1 1750.6

=} kind of 1st Flow 3.000 -181.1 1151.3.6

Flow time +..lsed fr.)- SHUT-IN PERIOD 1 = ,7.000 mini.itr:+..5

t3H(JT-.IN F'EFiIt7U 1 0.000 0.0 175E3.6 0.0000 0.0000 2.000 698.3 2456 .9..5Ui ~t',f 6.0364 5.000 1319.0 3077.a 1.6000 9.4716 7.000 1594. fî "5'.k °51: . 4 1.429h 11.2453 9.000 1f319.n 5577.6 i.3 :1:3Î:, 12.7992

11 . t:)C►ij 2006.6 3767.2 1.2727 14.1918 14.000 7-'50.0 4f)rlEl.tr 1.214..1 16.t.tbki9 16.000 27.88.0 4146.4 1.1.E375 17.1943 l d. t?t:,p 2506.6 4267.2' 1.1667 18.2090 2t.000 2629.1 4448.3 1.342Y 19.1874 27.007., ..,7.79-1.1 4551.7 1.1304 20.7160 25.000 1?8E38 . c:) 4646.6 1.1200 21.5909 27.0i71 i 2991..4 47`50.0 .1.11.1.1 22.5625 3i ~.::)r)i> "!.112.1 4670.7 1. 1c)t;ltti 27.7237 7:72.000 Z198.3 4956.9 1.0936 24.5709 34.000 ':.275.9 50714.5 1.08S2 25.3462 ;'7.000 33813.0 5146.6 1..0E3L1. 26.4F115 Z9.00° 731-56.9 tain. t, 1.0169 27.2014 41.000 3517.:i 5275.9 1.07 ;7,2 11.8351 41.00(1 3586.2 57.44.8 1.0698 28.5669 46.000 -ZfJ7+,'.4 547,.1.0 1.11652 29.4958 48. r;)t:)i ) ?.741 . 4 5500.0 1.0625 30.2500 5ti.t)ut:) 7,79.3. .t :5?n.7 1.0600 70.£121.4 `.iti . 0c'.)i] 3870.7 `rt629.3 1.0566 '1.bB9C) r5:5. 1.10o 7922.4 5691.0 1.0545 32.273E3 57.000 7974.2 'ti '7::t2 . Eî 1.0526 '1 .86t;) i '.59 .001) 44.)'27.N , 9 57H4. ti t . <<►:'•i:rF1 7Z.4604 62.000 4107...5 5862.) 1.0404 T4 . 3642 64.000 4146.6 9905. ';_ 1.0469 :34.13714 66.000 4 .1.5E3.'1 5956.9 1.0455 75.4841

4 E=nr.3 raft 1,t Shut-Ln , h7.01:0 4215.5 59/4.1 1.044k1 n.61=199

I'1.46..1 -

Page 4

DST hk: 4 SUI;IL.J I F' ST FI_11V E E:N #f3 1.470.0 m. - 1490.0 m.

t ,-Ica~'.i~++'► : 91FA21:+ 1.05t Type: CCII'JV t1TRF1(1Cf1..rc' F"urm4t.inn : I)CII r)M1 ï'f: }:

Recorder Number: 2004 Recorder Depth: 1474 m.

TIME-PRESSURE LISTING

L"1•9AF:1 TIME DELTA P PRESSURE (T'*dt)/tft PRESSURE

41G+E:L. COMMENTS MIN. kFa(a) kFa(a) AEaSCIrSA SOUAfiE:il k.Pa ( a ) '2/ i0~b

5 Start nt 2nd f=1ow : f.►.tif)C) 1857.4

fLtJW FEfilC{r? :' 3.. 000 --241.3 1611'•1 5,t1oo •-10•':.4 1.750.0 10.000 1.E3V.7 204U•.1 ,

15.000 155.7 2006.6 19.000 120.7 197A.1 :4.0+70 1E39.7 2044.1 28.000 206.9 2060.3 .3.7!..000 241.4 2094.8 37 . r1~ ~() 267.3 2120.7 42,000 ï84..`? 21:7.9 47.000 7.10.4 2163.8 51.000 310,4 216.;.$ 56.000 ~Ü _,19.f.t 2172.4 60.000 327.6 21E11.0 65.000 Z44.9 :198.. 69.000 1744.9 2198.3 74.000 362.1 2215.5 7'i.000 7.62. 1 2215.5

.. S;; , tyr i !,k79.4 7•, ,-' . F:i EîB.t;lur) 796.6 2251ï.0

92.00Q 746.6 2250.0 97.000 40'o.2 225.8.6 101.000 40n.2 22.ts0 . 6 I 1,16 . 1:11,11.1 405.2 2252.6 133. ,.(10%1 41;1t1.2 2=b8.6 L15,000 4].''r.8 2267.2

1:!0.000 417.13 2267.2.2 .;

6 End or ï.nd Flow . 1',`.:.0011 4~,2.5 2275.9

1].t7w t.1.mlq l.t,soc1 for rldL.1T--IN PERIOD I.. ' 126.000 minutuv,

I:,HUr-IN I'ERIC7p 2 t;f,t:nîij 0.0 2275.9 0.0000 (1.0iJnn

9,e701.1 b0:',.4 2H79.3 15.110t_►1,► 5l.2904

18.I:Ic'lc;:l 1t:174.4 33.11:1 , â 8.01:100 11:t.9581

28,000 1465,5 3741.4 5.5000 1Z.99E31

37.000 1E927.5 410.21.4 4.4054 16.8379

46 . Ix:lt.l 2155.1 444.:1 .1.77.91 19.633E;

55.000 2456.9 47';2.b S.2909 22.',;994

64.000 2141.3 .' ti01. 7. 1_ 2.96E9 25.172:

7::.0o0 , -_'.tll.l(i.la 52E14."1 2.77/10 27.9259

82,r;u

r 1:.67 ,2 514'~ .1i

2. `:E16 3' .776A

+^ .i'5.:4.43.0 531: 2.1'696i~ :,.7576

101.000 :;67.7.: 61147-1 2.:41",? ,43.1s141

.17y1 , '.' 39.27/8 .110.0410 ; ' 6':.'h "; .'..' .1.4:~1;

❑ n),..c.. , . " • .....

Ll51 4: 4 600L11i' Si i.LR1V 1lL.N 46 1470.0 m. •- 1490.0 m.

Locatlan: 43,+i421.'?

Recorder Number; 2004 Toot repel GtJNV STRADDLE

Recarder Depth. 1474 m. t- hrma t'..tiur} : DOLOMITE Ff

TIME--â'"•E ESI3 IRE L1ST1N6

l'I•IAF;) TIME DELTA P PRESSURE (Tt)/t F'F'iF::SSUF+B LADfrL. COMMENTS MIN. kPa ( a) kFa ( a) ABSC'.I :iSA SLItJAREO

kFya ( a )`â / 10' b

119.00n 4206.9 6482.13 2.056F3 42.0267 128.000 4405.1 6681.0 1.9844 44.6'35f3 1Z7.000 4612.0 6887.9 1.9197 47.4432 146.000 4537. 0.7. 7086.2 1.06L0 50.:14:; 1:6.000 5112.9 730/.7 1,13077 5'w .3•148 165.000 ti206.9 7482:.8 1.76.36 55.992ti 174.000 537w..7 7655.7 1.7241 56.6021 183.00(1 5.547.1 7E319.0 1.6H8`',~ 61.1368 192.+700 5699.2 7974.1 1.6562 63.9867. 701.01)0 5853.4 6129.3 1.6269 66.0055 210.000 6Cc00.t1 6275.9 1.6000 68.4905 2-)0.000 6155.1 947.7.1.n 1.5727 71 . 081c.3 =9.000 6:101.7 9577.6 1.5502 77,5752 236.000 6427.4 869E1.3 1.5294 75.G604 247.000 6b43.1 8819.0 1.51i3.1 77.7748 2.56. nnn #1663.9 E19::9.7 1.4922 7y. 91H2 265.000 6784.4 9060.3 1. 47;,i`,i 62.0990 274.000 6096.5 9172.4 1.4599 E14.1â29 294.cl!ic,c 7006.6 9284.5 1.447,/ E36.20.19 297.000 71t_1.ti.4 97Ç77.3. 1.400 87.9713 ~::c':.0ilÙ 7199 ..7 9474.1 1.4172 89.7596 7.11 .000 7784.4 95e,0.3 1.4051 91.3'997 7.-(.1.000 7:,7.70 . 7 9646.6 1.397.6 r1Z .1a5s59 329.000 7448.2 9724.1 1.78:'.0 94.55431 ,3":8.000 7!:+2.5.8 9801..7 1.:72:6 96.0773 348.000 7594.0 9870.7 1.3621 97.4.o7

7 End cl L'nt' çilt3.ct•1.0 . 7'37.1:1(i 1 1 I4)62:.H 99.39.7 1.:35i•.'q 9E3.7476

14 f ;ct+I Nyür'r15t,it1c, o 1.1 .t.100 16224.1

1,111.••••••••11, ~ •y

• •

• •

LZ 12 Co) DIP} uS G.QT / Z."+411 !JE

-L

b

e

0

-I. •

— _-, A._ eoL OW OP

uL 0.0i ~

i / 2.~~~

A

CZ T

VI

nt . TIMES

4,0 ":17.0

St;I . 0 242.Q

rtl::C NO. : 2004 I3EŸf=1H . 1. 4L4.00 LLIC:LI T I flN : OUTSIDE

E~LE t::TFii:IN I C. RE(,I11 NC3E.: Y.'.F'n (a)

F'tCC: NO : 8EI92 DLfF'TFi . 1434 . t; r,► m. LOCATION: QIJTSII]F_

FIELD READINGS kPa

1) Initial Hydrost_t:ir: 24Start of 1st Flow . :) ï.n tl of i:, t Flow 4)End of 1i3t Sr►1.it.,, jn : *)St:+ar?: cf 2nd FIDw 6 ) EnCS of :nci Flow 7)Ens3 of 2nd Shut -1n : 14)Finai I-iydrGst::tt,i.r

L.YNC: INTERIM r.)►1rF1cA}' CI'-',r F'.EPI:lrir

Wr.:Ll. NAME: SClCIUIP ST FLAVICN kS

LOCATION: 91FF1211) (}5T4 5 SOTS `t

1430.0 rn. 1C) 1470.(" m. FCJRM(a l" I t.lN : BEGK'MAN 'r t.}WN

TEST 1'YPL : CONY STRADDLE

TESTER NAME: KEN MNTi IV W`.«L:IN

TEST DATL:

BLOW DFSCE;11- i' I QN :

WE=AK TO STRONG IN .1~~ £sl::C . INCREASING THRUL Inh{ pt.lT . G. T. S IN h MIN. FF. 37FRONN A X R SLOW I NCFtit:Afi I NC THROUGH OUT. G . T . `J ('1N VALVE OPEN.

CUSHION: NO TYPE:

AMOUNT; 0.0 rn . FIELD ESTIMATED

rRTAI_ F.EClC7VF.ftY : 110.00 .+'tt:i n►. FF'l.'Ef•?SE< CIRCULATED: NU SALINITY; g/in'

110.i:10 m. of UA£3IF'lEL) URILLlh>a11 MUD

GAS T'1EASI.Ir?E:MFNTS : YES (GEE ATTACHED iEr Pt3(3E FOR Ml:.(',:iL.JftiEEMI:NTFJ )

DP OD: 114.0 mm. DC ] I7 .7.^ . ~lt'i mm. E_E:Nt:•3T Fa : m. ;•1m! N !i!:'ll..£ . 222.00 mm.

fiEMAfsi'-:â

MECHANICALLY Sl.1CïC:E_5!w!' IJ1_ TEST. RESULTS SLJlSGE:(ïT RELATIVELY LOW PERMEABILITY. THE EXTRAPOLATED %-ILI I••-IN PRESSURE: ; =.îHfJW A DROP OF 7.4%, IiC]Wt:VFk:ïti F INITIAL SFill'T-IN MIaYL+F INDICATING THk. F'FiF.SENi:Ë: OF MORE THAN UNE ZONE WITHIN THE TESTE.]) LNTLLF:VAi..

E3Ak.EF; OIL 'TUraL.tl C'ANAI7l1

s et

.+NR►NIPIhon.+

i

1

i' RI

000112 01:101,2 =On QOQZ Ce,) pidli ssinsevilJ

Page 2 DST 4: 5 EQOUIP St FLAVIIN SU 14,2.0.0 m. - 147().(1 m.

GE MEASUREMENTS ******Ax********

Dovl.cP:

FLOW M TIME (min)

Riter: (1.00

CHOKE- (mm.)

mm. Bomb rient

READINGtVNI(E0)

4: taz

W.:;.1day

4 10.01 6..5b0 4U0.00 w,296.0 •-) 211„QL1 9.525 .F.7.7u.017 L. 4)t) 9.52.4 7.U0.00 ."N 40.00 9.525 4 Q On 60731.c! or. 50.00 9.525 441.0n

60.60 9.:1L5 470.00 6609.0 70.00 9.t25 460.00 7011.0 8U.06 9.55 480.00 7011.n 90.ro Q . 400.uv W)11.0

Page #: 5

suouip: F FLAVILN 4U 14..7.0.0 m. - 1470.0 m.

LcLation: 91FA217, Recorder Number: T004

Termt Typwc CONY 31RADDLE

R'Icord.lf Depth: 1471:4 m. Formatlon: BEEKMAN TOWN

TIME-PREStiURE LISTING

CHART

TIME 14-1_14 (7+dt)/dt PRES1=MHE L1,6EL. COMMENTS

MIN. - a(a) kPix() ABSCSSA SQUARED kPa(a)-2/1fl-6

i Initial Hydrulr.hatlic: 0.000 itia44.a

:itart of let Flow : n.ono Z16Z.fil

PLOW PERIOD 1 1.000 -46:J.5 2699.Z 2.000 -667,8 2t00.0

Z.000 -66Z.0 .72.7.i00„0 7 End of 1st Flow 4( 77279.1.1

Flaw time 617:cd tcw SHUT-IN PERIN) 1 4.000 m.tnutpq

SHUI-1N FERMI) 1 0.000 0.0 279 .1 0.0000 0.0000

2.000 7060.7: 4853.4 3.0000 2-7..5:-In5 5.000 7.607.5 67,94p.6 1.8000 40.9165

7.000 4:01.7 709d4.F3 1.5714 54-1..1762

9.0(,0n 41319.0 7612.1 1.4444 ¶1-7.9441

12.0041 !-.:179b.6 81139.1 1.-1. 67.0712

14.000 t.672.4 846b.:2 1.285/ 71.6647

115.000 El."?..:: U677-.4 1.2500 7t;.10b

18.000 E-417'%.4; 1.101Q.0 I.=22 77.77414 1.190.

21.000 61:06.r,' 904 10.F.) 1.17-":9 P1.n4.$00 25.000 6241.4 904.-1 1 .1600 U1.6222

28.000 b297 .1 9086.2 1.1429 62.51.1V0

- 0.000 h119.0 911.2.1 1.1'r:'7 WL.0f04

?2.00r.J 67.44.1.1 g 17% f .t.). 1.12!j10 8.:"...501 1.:1

7.4.000 6370.7 91.6'..0 1.117b 8!..9Pn...*

L7.1.101) 641:..E4 9Tu/.z.9 1.10111** H4 .76,7t1

79.00u 6.1.1.0 97:7:4.1 1.10~1261 1=3 -1 0.1S41)

4',..0r)r) 6456.9' 9250.0 1.09/64 B7).':+:7)

44.1:100 e..,41-41.4 9264.1 1.0909* 96.2019

46.0n0 f...) 1 1."; 97.4(.1. .1,97s4 1-.36.6f117

40.0n0 6t,7.34.n 97'27.6 1.c)H7-* Q7.0)41

:10.00n 6560.7 9357.4 1.0(300* C47.4961

n7..04_10 hnHei.2 92/9.. 1.07t!il 07.9/1:

55.1)110 6b+)7.5 97.96.6 I.u7"./* Ev4-3....v6t.

4 End cif LmJ. 57.01.11, /11.) 942.7.:,A 1..1_0(1* S14.71.11.S

t:tart ol 2nd Fl- kli.4

FLOW rf7.kl.Un 2 1.1:1(10 -H.'

4,0(,0 î.,, .t :!.1.H.1.0

.3.000 4 f.'i . -,..1 4t,'11.71

1.1..0 0L. 1:15.1 26U1.0

1:1.110‘.1 E-16.z.0 '.2St-J7.9

11:1.0):',u 1'461 ,;,9cili,..1

Page 4 DST *: SOUUIP SI FL() EN *8 1430.0 m. - 1470.0 m.

Lncatlon: 91FA215

Re.corder Number: 2004 rest. Type: CONV STNADDLE

Rocordor Drepth: 141%4 m. i*c.trméltions BEEKMAN TOWN

TIME-PRESF;URE LIST1NO

CHART TIME m:LTA P PRESSURE (1d1_)dt FPESSUI-4. LABEL COMMENTS MIN. KPA(a) ikPa(m) AHSCIEF1A SOUARED

6 End of 7;:ivi

21.000 25.000 1:U.000 ,.12.000 .7.5.0000 39.000 42.000 45.000 49 52.000 56.000 59.000 63.000 66.000 4,9.00n 77..000 76.000 80.000 ES.On0 87.000

1068.9 1155.1 1.190.2 1,7:50.0

1T10.:5 1327.0 11127.5 1336.2

027n 1=7.!, 17;27.5 1327.5 1.31e.9 1718.9

1701.7 001.7

i$97.1

3071.0 7.181.0. 7,224..1 3275.9

77.:171%.4

3Z53.4 3344.8 Z72.44.0

":=/.11

7;77:1v0.0

Flow time iA5eJ t HUT- N fL.RIOD 2 ,.. Y2.000 minutu

SHUT-TN PERIOD .7 0.000 5.000 11.00u 17.000

-

20.000 34.000 40.000 45.000 5i.000 57.00o 67.000 60.000 74.000 00.000 m5.ou0 9A..0o0 40_0(.m AQI.0011 108.000 114.000 120.000

0.0 2094.).3

4AHP.6 4594.H

!‘77.4'./

57,96-5

"41..75.41

-14 rj

tnati.!".5 /4 j.

,t'1402./

37:19.0

.0 750R.6 791.0

W2.114.• !5

F:140.H Fin:7=1.7 a612.t

FJ68A.0 0715.5

871-,c1.▪ 0 87'50.4 876/.2 8775.9 B7H4.5 8193,1 6003.Y

0,0000 0.0ue,14,)

19. 4000 29 . t37: 6 4ts , 567;5

6.411 1 56.7791

c1.0011) 62.b"g'.7. bn.not,:

3.70t19 68.67:9

*mig) 7u .11474

7,0444 •7,1.9n/9 . ) 717 7 . 1 6

61.40 74 . 1.11L17.

. 41*)"*- '7 4 .

''.7•52' 35'le

:2.74 •2.*:' 7 4-7, 5.9P

.1t 4)0 /6 . 26 ti ▪ •• tit 324 -/ 6 .

2.1111 •.1 76.71-1

I .9485 76 . f36.7,E3

1. r.39',.7. 77.0l,4 77 .1 674

1.8(17( 1 71.71136

3 . /1367 17.4690'

F't'Ig w 5 DST tt : 3 S11C111 t F' FIT (Ln)EN ##8 14. 1,.:.o m. - 14/u.0 m.

I..occ+rirm : 91FA21 `+ Test Typa: CC]NV 51Rt'3E)I+t_v f=larmat.].Can t f+FE-t':t"1AN 'Tf.7WN

F;etcorder Number: 2004 FCe[;7r•r;nr Depth: ],47.y t11.

TIME:-F'RE8`31JF:E LISTING

CHART

TIME DELTA P PRESSURE (11 dt) /cet P17E_:iSURI . •4. NHC:l. E1CMIr1ENT5

MIN. k.F'eial kFatui AEJ CtEIA iOLIAF3ED

125.000 5402.7 8801.7 1.7361.i 7 I. 4b'•i+H 131.000 5482.7 8801.7 1.702-.;* /7.4,s99 137.000 54~r'1 . i 8010 .3 f. .67?. ~* 71.6214 143.000 5491.1'. 8F310.7. .1.6474* 7:1.62.14 148.rt+.$0 t1`,c:3t1,4 881.9.0 1.62.16* 77.774E3 1:4 . n<-► e_1 ~o5cie . f, fJF3< 7. h 1.t+974* 77.9265 160.00') n317.2 8H,.7.6.2 I. y 1;5ry* 78.0784 165.000 55.17.2 8876.2 i..5376x 78.0784 171.000 5525.e 8844.8 1.t7.00* 7tir3.::'sil;ï 177.00U 5575.8 8844.E3 1.$1Q8* 78.2;t;In 181.000 '?5,74.4 Q85±•.4 L.M027* 76.3E327 188.000 5`.~43.7 E3862.1 1.4894* 7E1.5360 194.000 ,t51.7 e270.7 1.4742* 78.689-t 20(1.000 5s:151.7 eE37o.

.7 .1..4600* 78.689.'..

705.0+)0 556(:.:17. 19E179.7 1.44f:10t: 711_E3420 211.C}oiït $56E1.9 E3E347,y ] .41?l.rT* 7EZ.9911H 417.000 5516E1.9 8E31:1i.9 1..4240* 7H.994#3 223.000 ti5

[7y7.(~

{E~i173~~

♦C-T.G .1 ..4

/1~~.0

1.# 7

)'7.?4*J

`t,

6i8.[ttJt~ 55Ub.~. UITIi 5.L. .1,.~~41'JVt /'~.tiJt~,Y~L~ 234.C+00 5 ,94.8 89171%.D 1.39:L2* 79.4558 7,4C•.1.-0.) 5594.8 691,....8 1..7El' .:x 79.4558

7 End of : t1d ihV.t.-s.n . 2.42.C+(21:) tT ~94.E3 E39] .L.13. 1 . 1-J 1:1 T>X 7+7.4ti51+

14 Final My6rllIni:.,~t::1c . 0.+:ki10 1724.1

* DE.NL_f'I En VAL.Ilfi. USED FOR FYTE:r;P1_A'I lC1;V GF1L.C,UL_t,'i`10N ~:~

SHUT•-IN 1: liflr'rivr L::; tr"npC) 1 .i t i c-1rZ : 90r1' . / L:i-.A t.1 l HornPr S I qp ~2

6 . :.t'::1 ( a ) :2/ l-1J '';, l: c'yC : N

5-HUT-IN ':.'. I-inrntsr i:'trahctl ~ t'.tollr w1J713.'•a':1 L,f';:a(.a)

Horner Slcrype : 42.1. (kP•1!~l'2, t0 E.)/ryr.p

1

et at Ce Oh CIS 055 3à04 uf 11.OL / 2.64E1

ert

i

w eK

.. E

0T1 ~)DdyE i+l 0.01 / E_4r40~ ~ Qt QEt

SOQUIP ST-FLAVIEN NO 8

DIAGRAMME DU PUITS

Kb

~

DOLOMIE C

NO

UV

EL

LE

S Z

ON

ES

177mm i 1489,42mkb

BOUCHON DE CIMENT

DOLOMIE B 1520mkb

1540mkb

1560mkb ~

1600 mkb

1620mkb

r 1640mkb

1660mkb --,

1680 mkb

1700 mkb

1717 -mkb

1524,50

300 mkb 38S •'= 245mm

U 1189,00

1 1192,25

2 1195,00

1454,00

3 1457,50

DOLOMIE P

1463,00 DOLOMIE H S ~ ~ ~ 1486,00

N UJ

GE

OL

OG

I E

1496,50 1514,00

1535,00

8

1540,00

SOQUIP ST-FLAVIEN No 8

DIAGRAMME DU PUITS

SOQUIP ST-FLAVIEN NO 8

LISTE DES QUANTITÉS

DE BOUES UTILISÉES

6\

1

ENERCON ENGINEERING LTD

MUD R E CORD WELL NAME SOQUIP ST. PC.AVIEi 111

PRODUCT

$/Sack

Discounted

DATE (fill in number of sacks below) PAGE

TOTAL 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan IS-Jan 19-Jan

Bentonite 160 11 10 43 23 23 270

Bicarb of Soda 16 16

Caustic Soda 6 1 7

Lignite

Peltex

Lime 4

CaC12

SAPP

Alconer

Soda Ash

Staflo

CMC

Sawdust

Kwik Seal

Celloflake

Barite

PolyPlus(pails) 8 8

Mud Man Cost 450 450

Van Rental

Trucking

Daily Cost 1440 300 776 130 557 298 450 260 2104

Cum Cost 1530 1830 2606 2736 3293 3591 3591 4041 4301 6405

SOQ81lUDl.XLS 3/16/92

2

ENERCON ENGINEERING LTD

MUD RECORD WELL NAME SOQUIP ST. FLA7I® 18

PRODUCT

$/Sack

Discounted

DATE (fill in number of sacks below) PAGE

TOTAL 20-Jan 21-Jan 22-Jan 23-Jan 24-Jan r 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan

Bentonite 28 20 2 3 53

Bicarb of Soda

Caustic Soda 1 1 1 1 1 5

Lignite

Peltex.

Lime 1 1

CaC12

SAPP

Alcomer

Soda Ash

Staflo

CMC

Sawdust

Kwik Seal

Celloflake

Barite

Poly 6 4 2 4 7 6 4 4 6 3 46

Gypsum 2 2

Shaw II(pails) 2 4 1 7

Acid 1 1 2

Mud Man Cost 450 450 900

Van Rental

Trucking 708 708

Daily Cost 1737 1075 452 1369 1839 1378 1402 926 2790 807

Cum Cost 6405 8142 9217 9669 11038 12877 14255 15657 16583 19373 21299

SOQ8MGDI.XLS 3/16/92

3

ENERCON ENGINEERING LTD

MU ID RECORD WELL NAME SOQOIP ST. FLAVIES 18

PRODUCT

$/Sack

Discounted

DATE (fill in number of sacks below) PAGE

TOTAL 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb

Bentonite 18 13 14 15 15 75

Bicarb of Soda

Caustic Soda 1 2 . 2 1 2 8

Lignite

Peltex

Lime

CaC12

SAPP

Alcomer

Soda Ash

Staflo

CNC 6 6

Sawdust

Kwik Seal

Celloflake

Barite 144 144

Poly Plus 3 5 3 2 4 4 4 3 2 2 32

Gypsum

Shaw II 2 2 2 6

Acid 1 1 1 3

Nud Nan Cost 450 450 450 450 1800

Van Rental

Trucking

Daily Cost 1383 1174 870 813 1321 903 1120 871 947 2848

Cum Cost 21299 22682 23856 24726 25539 26860 27763 28883 29754 30701 33549

SOQ8NWI,XLS 3/16/92

4

ENERCON ENGINEERING LTD

MU D R ECDRD WELL NAME SOQOtP ST. FLAQIEa i3

PRODUCT

$/Sack

Discounted

DATE (fill in number of sacks below) PAGE

TOTAL 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb 17-Feb lb-Feb

Bentonite 18 30 77 125

Bicarb of Soda

Caustic Soda 2 2 2 2 8

Lignite '

Peltex

Lime

CaC12

SAPP

Alcoter

Soda Ash 1 1 2

Staflo 6 1 1 2 2 4 2 2 2 22

CMC

Sawdust

Kwik Seal

Celloflake

Barite 144 12 10 166

Poly 2 1 2 2 2 4 4 4 2 23

Mud Man Cost 450 450 450 1350

Van Rental

Trucking 1100 1100

Daily Cost 2846 354 595 1680 453 1015 1416 1655 1548 2232

Cut Cost 33549 _ 33903 3449E 36178 36631 37646 39062 40717 42265 44547

SOQBMUDI.XLS 3/16/92

5

ENERCON ENGINEERING LTD

MUD R E CORD WELL NAINE SOQUIP ST. FLAVI® 18

PRODUCT

$/Sack

Discounted

DATE (fill in number of sacks below) PAGE

TQTAL

HOLE

TOTAL 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb

Bentonite 10 6 16 539

Bicarb of Soda 4 4 20

Caustic Soda 2 2 30

Lignite

Peltex

Lime 1

CaCl2

SAPP

Alcomer —

Soda Ash 2

Staflo 22

CMC 6

Sawdust

Kwik Seal

Celloflake

Barite 15 15 325

2 3 5 114

1 2 3 5

10 10 23

15 15 20

Mud Man Cost 450 450 900 5400

Van Rental

Trucking r

180$

Daily Cost 46 837 500 1028

Cum Cost 44593 44593 45430 45930 46958

SOQSXUDI.XLS 3/16/92

SOQUIP ST-FLAVIEN NO 8

LISTE DES TRÉPANS

iD

Cri

ô

~

Û a

~

--. m-

71t . .•

c S n.

--- --_

=

N

..~-~..

ô

o.

r. °

r• Ci

~J

_^

~

J O Cl

~

VI x

Gi

LIC

. Dep

th

1775

Ha

ters

~ ~ j

-.0

------,

v

[Me

ter Da

yw

ork

0 t

o

TO

„ +3 . a . V ~ ~

z

< 2 m

> w 0

7 W 0

9 I uI i 0

o r- r

ac a c ►-

t 2 m ' t 2

m .c 2 m

DU

LL

CO

DE

Ti T

o M

dc

Lac S

Ga

ge

OD

C

_. é

!- C °

0 O o .. .. .1.

o .. 0.41 .. O i•-• .. ~

W SY W w wA W W W W 31.,

< < < < at X 2 2 2 u A vi O O

Ree

d Sa

lesm

an

WAR

EH

OU

SE

/CIT

Y SA

LES

Typ

e L

iner

PU

MP

S 1

) 8P

80

1 52

/140

2) N

AIL

700

20

3/1

40

Sp

ud

ded

1 / 8/9

2

Un

der

In

ter

/ /

Se

t S

urf

ace

1

/15/9

2 C

om

ple

tio

n

2/1

7/ 9

2

Un

der

Su

rfac

e 1

/17/9

2 R

ele

ase

/ /

, .- 7

►- 3

M 7

f- 7

r 7

r. 7

`- 7

ci OC

►- 3

ti N -) O

O

N M M v M v .O v N Y

N M M VI. M v M M N Ki

N ~ 0

câ ÿ

Op

era

tors

R

epre

sen

tati

ve

WIL

F K

RAI

JCH

UK

~ C ti F-

2 2 .

2 X 2 2 2 2 Z

v,

MU

I)

WT

VIS

WL

03-

VI 1, O

1A N v

O v

O v

co V1

— ,O

.- M

M v

M v

u, V\ O

O LO O

O d O

O .O O

O cU O

O P O

ul v O

O N O

ut v O

Dra

ww

ork

sT

oo

lpus

her

BREW

ST

ER

N75

~ GER

RY

OU

IHET

~ N

O. ~.-.

Ÿ O

O N

~ 0 N

0 O

0 N

O N

O N O N

O N

G ' E Ô = N

a.. ~.

p p

.O

p Y

O

si,~ Q

V1 O ~

O

M O Ln IA i

0 n O O

Ln u1

Ma

ke

Siz

e T

yp

e 0.1

).

TO

OL

1

) 1

14.3

XII 15

9 JO

INT

S

7 Â ,,,>' Q v .... 0...

.-N N N

M M M

M N M

W .

M N .-

op

era

tor

SOQ

UIP

,{

X

O O O a o

I.-~~b~—N ~,~

Cr 0 ~

.-

O

O b

~m O

LO ..

Cr o

t)lh

cr R

em

ark

s -

Ream

int, R

cdrillin

g.

Etc

.

GAS

KIC

K a

148

4

TIT

E H

OL

E

V a

L pp Z y

v

N ~

V\ \ N

v \ N

CO \ v

M \ v

tfl O

\ in

Sn

v V1 aO 1/1

v

~ u A ~

..•. u L. u L 2-

. cO

CO M

Cu . N

. v Mai .

M M . Cr.

In . .O

vO . Nin

CO CO ~

C 2 2 u O J ° <

in r.. N

in N ♦• N

v 1n

O A

V1 N v m

N P_ O

N f- .O .-

^ O Y3

V1 h- O ~

C ~„~

in r.

Cu

Ln

N

v+ t... .O N

Y N

v1 N

.O

Ln N

M N

O N

O.

^ V+ v

V1 1'~ CO ~

n ~ a1 u

u -,:: .c C

v N

M Cr,

m N M O

v N

~O

N

O W

P M

P P N

O• Ln N

•. C-0 ~

~ ..= - d v d

v N

~ •-•

N 0....

CD t. N

N O M

0 v N

0 O M

0 v M

P P ul

P P Sn

No

. O

.D.

I-I)

.

DR

ILL

1)

1

8 170 66

C

OL

LA

RS

Pro

'.in

cc

'Dic

k!

OFF

SH

ORE

OUE

/ST

FLAV

IEN

y Il

.- 7 l/

•-•

2

J J

~ 3C

~

~ E E~

P `

x M

P

~ x M

.- x M

~•

.- x

M

.-

~ x

M 3 x

11

. 1

P

.- x

M

~

.- x

M

.-

.- x

M

•-

.- P cc,

•- ^

~ a

v7 +

1!. CD P

O OC

M v CO

O ar

T35

44

LH3

45

1

~

rc *RR

5A

P

CO

O Ir

< N

Oc

u G•

-

N M M VI

Y `> N IL 2

-~i CJ M

CL 2

Y -s O.

N Vf

Y , U

N VI

O w

U 2

N M M V1

U

N V1

~ < M Y CL 2

Y 1 N 11- d S

u ~[

L U w N

U .- OC

U r- 4

U r OC

Ll r OC

U W VI

U W vi

U I- OC

U I-- Oc

U H- Oc

u ',..ti

Cu

+,

N N N

N N ru N

N N N

N N N

N

M

N

//1

N N est N

N N rsi N

N N f,.

i ~ <

N rr<i < v

C v1

f •0

•( •(r.- ^ N

- . r--.

DU

LL CO

DE

DE

FIN

ITIO

NS

BIT

RE

CO

RD

;io

n T

ow

ns

Op R

ag

00

0

ST/

15

~

LIC

. F

orm

ati

on

OO

LO

Mi

LIC

. D

ep

t h

1775 M

ete

rs

u

_ V V J

V N

Me

ter

Day

wor

k

0 t

o

TO

C 7 V Il ~

4

t x CO

t z m

t 7C m

4 u

t x CO

a u

DU

LL

CO

DE

Ti

To

M

dc L

oc B

Gag

e O

DC

Y u

N ^ .- r. ^ ^

W W W W W W

X X Z X X X

~ n O O

Re

ed Sa

lesm

an

UA

RE

HO

US

E/C

IT

Y S

AL

ES

:1 C J

o. Y,

F

s.O

O

\ 1•I

r O

~ N N

^

O i,

CO r-

m z

r N

0 a :2

P..

r

:17

1

'

.P ^

Sp

ud

de

d ii

8/

92

Un

de

r In

ter

/ /

Se

t S

urfa

ce

1/1

5/9

2

Co

mp

leti

on

2/1

7/9

2

Un

der

Su

rfa

ce

1/

1 7/92

Re

lease

/ /

L- 3 1.- 3 tl a , r- 3 c:l Lx m

'-/-s ~ J p

0

M v N N rn CO

N M ^ ^ N N

Ln .0

A C. H

Op

era

tors

Rep

resen

tat i

ve

.

~~EJI

LF

KR

AW

CH

UK

Y

t 8 y F.

Z Z Z Z Z Z Z x Z Z

O~

MU

D

WT

VIS

WL

P

W tD

O .O O

CO P

N O ^

Na

O .-

CO

P

v

O ....-

O

P

hi.

P

,O v ^ v r- v ^ v N v N v M Y

M v M v Y v

O to O

O tg, O

O .O O

O n. O

O A O

O A O

V1 A O

O La O

N O O

O O. 0

I)raw

wo

rk

s T

oo

lpush

er

BR

EW

ST

ER

N75

GE

RR

Y O

UIM

ET

G N

a vi - O

N O O

^

O

~ O^ O O

O O

^

O .NJ N -

O

a0 .-

G N E c a a

O O ln M

O O ln M

O O P •O

O O O rn

O O ~

O O ~

O O Ln •O

O O

A In

O O

v

O O

O v

p

V

i.

u

V Y b

O` rG

X

M ~

^

r

^' h C Z

t -• v

- > û ~ >

M v

v o

A Mn

Op

era

tor

SO

QU

IP

L

Y

0 O ~

~ ^

ô

0 aD \ Ov ^

ô LA m

OA

0 .- ~ CO(,fl

0 0 ~ 0Y

o —

0 .- ....

A

o m

)cher

Ken

sar

ks - }

tea

min

g,

He

dril

lmg

, li

ti.

CA

S K

ICK

r7 148

4

TITE

HO

LE

_

-ÿ a ~ ..

i-. ^ .13 (n LA

(7, v, Ln ~ (n

\ Ln

\ o W i )o

b

V ~

~ û

0.

N

v

N

^

Ln

M .

M

~

LA

0

O

0

M

rn

v

ac .O

O

m

O

O

V ~

U O

Q r..

LA •

~

Pm m N

Y Ln N

in LA A

^ A N

W

LL O

U. >L O Q

LA

A O M

LA N

Y N Mn

Gel

` o O .

1/1 A

o CO

Ln

N

N N LA .D

~ W a

(n . ^

~ w.O $z 4 7

w Sÿ d -,

VI A M

LA .

un M

A. ~ N

to

~

I. ..a 0

v u

L = ~

v M

0 v M

0 LA N

O Ln N

M M M ^

M

F

M1 LA,

C4 •Y ~ ~ -- 0,

0 a O ~ ...

M D.

M o aP

LD ~

QP

.- CO O.

N

^

Ln OP .-

^

~

v Ln

~

A N

~

M •O

~

1

No,

U.I).

I.D

.

DR

ILL

1

) 18 1

70

6

6

CO

LL

AR

S

he

ld

QU

E/

ST

FL

AV

IEN

`on

tra

ct o

r

RA

LEX

DR

ILL

IN

G

_

E

-, E

3 x

9.5

^

r- ~

c. A

V1 O.

x M

^ ^

x M

Ln

P x M

A LD x M

1

+f •- 1 H

80

08

32

t M

+ a~

O N

z

Y A .O

v

U

12 4 ~

A 72 IX ~

LL9S

SH

~

O: û

u c.

F-

?{ 1 M Y a X

t a

1( _)

M

a z

x 1 ~ N a x

]l 7 ~ M = a L-

t ~ a +A

t t a VI

1-~

Y 7

V1 d x

Y 7 ~ V1 a s

W a 0 u

Y. LY 0 u

fill

In

ce

OF

FS

HO

RE

V SI s 2

U r- a

CJ r- a

U I- a

h

U r OC

a O S

(J r Lr

U r- a

W O U

Lot aLZ O U

N Ni N N

(V N N N

N

N N N

N N N N

P

~ N

lT

^ N

N

N N N

N N (V N

O M. N

O, MI. N

~ J V1 +O A U LJ

fJ m P U r

f.i Y

DU

LL C

OD

E D

EF

INIT

ION

S

! y~

ht1{

i ~ ~ S ~

~

~

o =~~ ~a~ ilt,Mô~qi

igôQ~ 9 i_ c~Q

tj ./. } W

:,..IL ~ ;o3 z

0E17b~3~~N~~_~ $¢nn f~,'~ ~â

H'S'l§lVÛ3

2zçn0j¢ r]7 ~aJu$

c

ill ~ ,1--i,.2

Ÿ 4 H LD -11

'x!,,.

- n ? m t F,§

2o ¢

o' <!f 2

~

M

~

ÛÔ J ~jN? j

~ W W W

O IL.; Wr

'

Lc

r w i

LO

G L

OC

ATIO

N CO

DE

S

HO

LLE

R C

ON

E

N-

NO

SE

ION

S

M -

1.410( E

Gow

S

H• N

t E4

RO

WS

A -

AL

L R

CAV

S

FIL

ED

CU

T TE

N

C-

CO

NE

N

• N

OS

E

i - TA

T'£

H

5-

SH

OU

LD

ER

G

- G

AG

E

A - A

IL A

RF

AS

~7 ,i,,-

.-WA.'1 Y

3 h CKag9a O~ V",w51i _~` ôN-n-y

[[{{55v N`ppi~ ¢i~n¢~~2û

1 Lrt,Tx:r-g~~ V

u ~ . û N

o _W 8; W 5,, 5~ S ~ G _.y t`4:-."'N i ~ûYy~q W ~ i ~~3~$c'; ô i UU rc~_.-fQ•~ ~

s ~~ :Ÿ~3?~ as =

.5 .YYRÿ ôiS ,4 3

Y

i u û ~u tt vii". Z 5- tt

i~30i~sQ~', JJYW~~~T

~'~1i~~~2 ms,,,,,,4,,W

mxi-J {}Û 1

zz ~rz 8'3 8~ p O-

â d` ' mu ~ ~ •~> ~a 7-'2;1

G

^±.i ~,,~ i

[!~' ~Y' ~ ~V -? .T .j~:i

eol

c

c. _

". V

- J

LIC

. fo

rma

tio

n

OO

LOM

I

r u

LIC

. Dep

t h

177

5 M

ete

rs

N ..m

a ~:

.....

n û u Y

M __ ac

Me

ter

Day

wùfk

0 to

TO

~

0.

a u 1-•

PAVI a

a u

a X

o

DU

LL C

OD

E

Ti To

Aid

e. L

oc 1

3 G

ag

e O

DC

,- •- u

a 7 Ô F- O C o

e. .1.... .. M

W w W W

.. <

V y C

Ree

d S

ale

sman

WAR

EH

OU

SE

/CI T

Y S

ALE

S

Typ

e Lin

er

PU

MP

S

1)

8P8

0

152/14

0

2) N

AT

L 70

0

203/1

40

Sp

udde

d 1/ 8

/9

2

Un

der

Inte

r / /

Se

t Surf

ac

e 1/1

5/9

2 C

om

ple

tio

n

2/1

7/9

2

Un

der

Su

rfa

ce

1/1

7/9

2

Re

lea

se

/ /

I- CO

.. ~ CO

~ CO

.- M 1M Vu r.,

Le ..t 0

a r m M v

N Q I-. . ~ ~ r+

Op

era

tors

R

ep

rese

nta

tive

WILF

KR

AU

CH

UK

wQ y ~

z z z z z

...1N

y l

D ~ ;..i.

1..

GO N A

N r`

M rti

ln

IA

N r-

a0 r-

Y P.

m

Mw v

M Y

fn Y

M Y

tel Y

N v

M Y

IN v IA M

O CU

N P

~

O

~ ~

O ~

~

M

.N- ~

~

~ ~

M

rN- ~

O Cu

O

~ ~

r

.

O

r

-

Too

l push

er

GER

RY

OUIH

ET

~ Ni

Cl.:

V7 r• O ~

O o

O ~

m r_

~ r- N r- N «- N

r N r- N

..-

C..

vi

~ ii P. C

O 0 P/1 •O

O 0 A Y

0 0 O m

0 0 O M

O 0 O M

O 0 cn .O

O 0 M f•

O 0 N 47

O 0 M .O

O O O a0

Ma

ke

Siz

e T

yp

e O

.D.

TO

OL

1)

11 4

.3 Xli

159

JO

IN

TS

-' i

7 ~ u ~N

M t. ~ ti

N 1A

~

dtn

oo

s

Io

tula

rl()

L ~ O m

M ti

O m M ti V1 n

M 1... m O V\

N M r.... m O

t)t

hcr

Kern

ing - R

eam

ing,

Redn

lling,

Etc

.

GAS

KICK

B 14

84

TITE

HO

LE

rAZ u 3

ÿ m .O c0 O ~ sa

m ~

m ~

m .O O ~ ,0

m

w.r

- û

7 a

ao v

~ r-

û0 .O

M

•- ^ "'

b O

O v

.O O

u: O

~ N1

1)ra

ww

ork

s

BREW

ST

ER

N75

E ] ~ û 0 4 +~

N M .0 N

es ru

m .O N

LL i 0 a

LL LL Q o .o

O M

a

O

a

M ru,

O M

r, ~ C _

,n ~

Y

M O`

V, W M

~ P~ ~

W P

Q -]

W OP Z

.-. OC

M f~ N Ml

W In î~

0z. ` `1

LU s.0 N . GC

M N P

Vÿ

L ^

h 0 m V' N ~

N ^ N

,__—

v

C4 r. t -

0 C,.. C

û'

.Q m Y.

.O d` ..-

v

r-

,f+ ,n N M ~ ~

O VIn ~

[V f~

.O M

I]

ti ~

1

m m ^

~

~

No

. O

.1).

I.

D.

DR

ILL

1)

18

170

66

CO

LLA

RS

E u E m x

0.1

l'..- A

m x

N

m x M

~

m x M

he

ld

OU

E/S

T FLA

VIE

N

O z

: Ô :w X

~ W C t

~

.... _ b

H N N a

r- Y ti

X

F

*

k

ac ot

O J !

a a

u ~ a aC

U r a K

m p v M M X

~

a. '

u L

{-

Y 4 (V I0 a =

w K ca u

~ 4 (V

n. m

w W o U

w a o 4

W a- o 4

-, i Kl M a S

44 OC o U

W a 0 U

Y --. 4 M M a Z

rro

si n

rt

OFF

SH

ORE

V

: ti

~ oc

lu x O u

Ÿ aC

W a O u

W ac Q u

w oc

u .0- pC

W ~ u

W â

U ~ P- 0[

N ~

N

N Cu N

O

.D

N

-I ~ N

N N N

O

^

N

O

.n r_ N

O . ~

N

N ,

N N N

O

^ N

Q

^ N

NI fV N

~ V-

u .(J -,

~ ) rL]

N lJ Q`

La 0 send ^ ..

l O u

V.

DULL C

ODE

DE

FIN

ITIO

NS

M

ô

cv)

ca

Û n a

SOQUIP ST-FLAVIEN NO 8

COFFRAGE ET CIMENTATION

~►

03 n3 nKB

daTl

_IOQU.IP CA:3 i NG S. (~ 11,:ML:N`i' T. NG RISk~ORT

WELL N?.KE SOQUIP CASING STRING Surface LOCATION St—Flavien No. B DATE 92-01-15

SUPERVISOR Wi l f Krawchuk ROLE SIZE 311 CENENTERS Nowsco T.D. 300.8

CASING fas run in the hole - from the bottom, not including Harker jts)

! JOINTS 0.D. kg/m GRADE OOUPLING RGE RAKE LENGTH

23 244.5 48.07 H-40 ST & C 3 Ipsco 300.48 m m

m

CASING BOWL ELEVATIONS GUIDE 580E Baker 0.35 ■

HAKE Crown K.B. Elev. 143.55 FLOAT COLLAR Baker 0.51 m

TYPE CC-22 GROUND Elev. 136.65 STAGE COLLAR m

SIZE 279.4 KB-GRD 6.90 KAMER JOINT a 244.5 KB-CRF 6.90 BARKER JOINT m

RATING 21000 TOTAL. ON ROOK 301.34 a

SEN t 46824-1 Stick Cp 0.57 m

No of PLUGS One LANDED AT 300.77 m

TYPE of PLUGS Rubber Top of Float Collar 273.39 m

SCRATCHERS Type, Jt t's, Intervals, Total t Run Top of Stage Collar m

N,A Top of Marker Jt 11 a

Top of Harker Jt 12 m

2 Joints Out 25.95 m

CENTRALIZERS Type, Jt l's, Total 1 Run Total Casing on Location 326.43 Baker latch-on, 7 run: middle of Jt 11, top of Jt is 1, 5, 9, 13, 17, 22 Cut Off Length a

CEMENT ITEM Tonnes Class Type _ Additives Kq.a3 Vol Rate

Pre-Flush Water Nil 1000 3.00 0.90

Filler

Tail-in 21 G 0-1-0 2% CaC12 1901 15.89 0.60

Displace Water Nil 1000 11.25 0.80 CEMENTING

Start Nil Time 10:52 hrs Nud Weight 1090 kg:e3 Vol. Cement returns 5 Start Displ. Iime 11:28 hrs Nud Viscosity 6 0 sec 1 Vol. Lost Returns N i l

Buap Plug Tice 11:41 hrs Yield Point Pa Cale Cement Top Surface Bunp Plug Press 8000 kPa Open Hole Vol. 22 .9 a3 Csg Rotated? No Floats Held OF? Yes From Surface cKB Slips Set with N/A

Pipe Recip. Until Displ e3 left To 301 IT Cet Bin Requested? N/A Pipe Rot, Until N/A e3 left Cat Head Type Swedqe Bell Nipple melded On? N/A

Cet Vol Based on Theor. [nit String 6t 17000 daN Protector Plate On? N/A plus : lacers 100 Final String it Chnd Dwn daN Primary Seal Install.? N/A

Conrients: Good circulation throughout.

S0Q8CN11.1LS 1 16 92

n

ÇTVQU I l?

CAS ~ NC C35:MJE;NT=NG RF]PORT

WELL NAME SOQUIP CASING STRING Prod.

LOCATION St-Flavien No. 8 DATE 92-02-23

SUPERVISOR Wilf Krawchuk HOLE SIZE 222

CEMENTER& Nowsco P.B.T.D. 1490

CASING ias run in the hole - from the bottom, not including parker its)

!JOINTS O.D. kg;l GRADE COUPLING RCE NAPE LOGIN

115 177.8 36.69 N-80 LT & C 3 Ipsco 1463.49

1

CASING BOWL ELEVATIONS GUIDE SHOE Topco Float 0.42 1

MAKE Crown K.B. Elev. 143.55 FLOAT COLLAR Topco 0.45 1

TYPE CC-22 GRtx7lD Elev. 136.65 STAGE COLLAR 1

S1ZE 279.4 KB-GRD 6.90 MARKER JOINT Ipsco 5.78

I 244.5 KB-CBF 6.90 MARKER JOINT 1

RATING 21000 TOTAL ON HOOK, 1490.14

SER ! 46824-1 Stick Up 0.72 m

No of PLUGS One LANDED AT 1489.42 1

TYPE of PUGS Rubber Top of Float Collar 1462.64

SCRATCHERS Type, Jt f's, Internals, Total i Run Top of Stage Collar 1

N R Top of Parker Jt il 1443.60 1

Top of Parker Jt 12 1

4 Joints Out 51.09 1

CENTRALIZERS Type, Jt i's, Total f Run Total Casing on Location 1540.36 1

Topco type 305 latch-on, 35 run: riddle of Jt fl, top of Jt i's 2 - 6, Cut Off Length

ever? 4th joint to surface

CEMENT

ITFJ( Tonnes Class ripe Additives Kg '13 Vol Rate

Pre-Flush 2 m3 water, 2 m3 5% CaC12 water 2 m3 water

2 m3 Thikseal P, 2 m3 water, 2 m3 scavenger 13.00 0.70

Filler 23.6 G 0-i-2 nil 1797 20.50 0.70

Tail-in 16.2 G 0-1-2 18% NaC1 1840 14.60 0.70

0.5% T-10 0.5% 03-24

Displace Water Nil 1000 28.80 0.70

CEiENTING Start Mix Tile 12:34 hrs Mad *eight 1115 kg 13 Vol. Cement returns 4.77

Start Displ. Tioe 13:56 hrs Mud Viscosity 40 sec 1 Vol. Lost Returns Nil

Burp Plug Time 14:37 hrs -geld Point 3.5 Pa Cale Cement Top Surface

Bump Plug Press 16000 kPa Open Hole Vol. 57.7 n3 Csg Rotated' No

Floats Held OK'. Yes From Surface Slops Set with 43000

Pipe Recip. Until 10 03 left To 1490 dU8 Cut Bin Requested? No

Pipe Rot. Until N/A n3 left Cot Head Type Plug Ldg Bell Nipple Welded On? No

Cot ':ol Based on Cal iper Init String Wt 48000 dalI Protector Plate On? Yes

plus l Excess 20 Final String it 43000 daN Primar: Seal Install.? No

Connents: Used automatic slips.

S0Q6CMT2.Stâ. 22') v2

daN