BEFORE HONOURABLE NATIONAL GREEN TRIBUNAL WESTERN ZONE BENCH, PUNE Application No. 63 / 2020 (WZ) BETWEEN Vikramsinh Manikarao Patil & Others ............ Applicant VERSUS Shri. Chhatrapati Sahakari Sakhar Karkhana Ltd, Bhawaninagar & others ............ Respondents Next date: 25.10.2021 AFFIDAVIT IN REPLY BY RESPONDENT NO. 10 ‘Shri Chhatrapati Sahakari Sakhari Karkhana Ltd. Bhawaninagar’, Maharashtra (ी छपती सहकारी साखर कारखाना लि. भवानीनगर ) INDEX ON NEXT PAGE (The advance copy of the reply has been circulated by email to the Applicant and all other respondents. Then it is uploaded to website, which would be subject to scrutiny by the Registry and changes if any.) Translation of Marathi letters is provided, wherever Respondent would be relying on it, for its contents. Respondent undertakes to provide the translation in case of any other remaining documents, if relied. Mumbai, 22.10.2021 Filed by: AoR 198

Transcript of (श्री छत्रपती सहकारी साखर कारखाना लि....

BEFORE HONOURABLE NATIONAL GREEN TRIBUNAL WESTERN ZONE BENCH, PUNE

Application No. 63 / 2020 (WZ)

BETWEEN

Vikramsinh Manikarao Patil & Others

............ Applicant

VERSUS

Shri. Chhatrapati Sahakari Sakhar Karkhana Ltd, Bhawaninagar & others

............ Respondents

Next date: 25.10.2021

AFFIDAVIT IN REPLY BY RESPONDENT NO. 10

‘Shri Chhatrapati Sahakari Sakhari Karkhana Ltd.

Bhawaninagar’, Maharashtra

(श्री छत्रपती सहकारी साखर कारखाना लि. भवानीनगर )

INDEX ON NEXT PAGE

(The advance copy of the reply has been circulated by email to the Applicant and all other respondents. Then it is uploaded to website, which would be subject to scrutiny by the Registry and

changes if any.)

Translation of Marathi letters is provided, wherever Respondent would be relying on it, for its contents. Respondent undertakes to provide the translation in case of any other remaining documents, if relied.

Mumbai, 22.10.2021

Filed by:

AoR

198

2

INDEX OF ANNEXURES ENCLOSED

Sr. Particulars Ax. Page

1. Reply by Respondent No. 10 - 198

2. FINAL REPORT BY MPCB on current

Environmental Status and Compliance

R1 217

3. Last Three MPCB consent to operate application details (Tabular Form)

R2 286

4. News Paper Adverting of EC and

acknowledgement of Grampanchayat

R3 287

5. MPCB JVS reports R4 289

6. Wet-Scrubber PO, civil work Photographs

R5 292

7. Shareholders/farmers Bilateral

Agreement

R6 303

8. Reply letter to MPCB for 15 days storage lagoons

R7 318

9. OCEMS reading for last six months R8 321

10. DPR, Tender notice, Tech. Meeting

MoM for CPU

R9 332

11. Consent to operate renewal application and amendment

application for 750 kVA DG set

R10 353

12. Irrigation water supply permission R11 376

13. Six monthly compliance submission

acknowledgment

R12 401

199

421 -

3

LIST OF ABBREVIATIONS USED

Short-form Full-form

CPCB Central Pollution Control Board

EC Environment Clearance

MOEFCC Ministry of Environment, Forest and Climate Change

MPCB Maharashtra Pollution Control Board

SEAC State Expert Appraisal Committee

SEIAA State Environmental Impact Assessment Authority

PO Purchase Order

OCEMS Online Continuous Emission Monitoring System

DPR Detailed Project Report

JVS Joint Vigilance Sample

MoM Minutes of Meeting

CPU Condensate Polishing Unit

RTI Right to Information Act, 2005

GOM Government of Maharashtra

ETP Effluent Treatment Plant

ESP Electrostatic Precipitator

ZLD Zero Liquid Discharge

CREP Corporate Responsibility for Environment Protection

COD Chemical Oxygen Demand

BOD Biological Oxygen Demand

TSS Total suspended Solids

CGWA Central Ground Water Authority

NOC No Objection Certificate

NGT National Green Tribunal

200

4

MOST RESPECTFULLY SUBMITTED:

1. I, Ashok Bhargav Jadhav, aged about 54 years, am working

as Managing Director since June 2021 of the answering

Respondent No. 10, ‘Shri. Chhatrapati Sahakari Sakhar

Karkhana Ltd’ (श्री छत्रपती सहकारी साखर कारखाना लि.). I have

the taken required knowledge of all the relevant facts from

the available records and have the authority to file this

affidavit in reply, which I hereby do on solemn affirmation

and oath, as hereunder in detail.

2. Respondent No.10 (henceforth called as a Respondent or

Industry) denies all the allegations made by the applicant.

Nothing shall be construed as accepted, simply because it

was not denied or replied. Applicant shall be required to

prove all the allegations and averments that he has made.

CURRENT STATUS OF COMPLIANCE

3. Respondent requests to refer to the final report by

Joint Committee dated 07.01.2021. As it can be seen

from the Report that there is no damage done to the

environment, which is attributed to the industry.

[ Ax. R1]

4. Respondent denies the allegation made by the applicant

that Respondent industry is worrisome Hazardous industry.

Respondent submits that this is a sugar manufacturing

industry. Raw material to finished product, everything

produced, is fully biodegradable and treatable, including

the effluent. This is a seasonal unit which is operative in

only sugarcane crushing season generally from mid-

October to March end. Rest of period in the year, it is non-

operative or non-functioning. This industry does not

have distillery unit. Therefore, the pollution generation

201

5

and mitigation period are limited to the crushing season

(i.e. about maximum 5½ months). Respondent industry is

having required set-up of pollution control equipment to

handle the air emissions and generated effluent.

Respondent replied to the RTI filed by applicant alongwith

required documents. Reply was delayed only due to time

required for collection of those documents. There is

misunderstanding of applicant therefore he filed complaint

before Respondent no.1 to 9. Respondent industry has

replied all the queries raised by Respondent no. 1 to 9.

There is nothing pending to submit to Respondent no. 1 to

9 or applicant. Industry already submitted requested

documents by Respondent no.1 to 9.

5. Respondent industry have submitted reply to notices issued

by concerned authorities (R-1 to R-9) alongwith required

documents.

6. Respondent industry has responded to Points Examined

and Remarks by the ‘Joint Committee’ in their Report

dated 07.01.2020 (reproduced below). The answers by

Industry are at “A in the table below.

Sr. Points Examined Remarks

1 Applicant states and submitted that, as per the information received through RTI the Respondent no. 10 fails to obtain prior consent to operate which is renewed after its expiration. But Responded no. 10 provided only electronic

Acknowledgement receipt of Consent application instead of approved consent and fails to provide renewal

The Respondent Industry has obtained Consent to Operate from the Maharashtra Pollution Control Board (MPCB). The renewal of Consent is granted by the MPCB vide no. Format 1.0/CAC/UAN No. MPCB-CONSENT-

0000094643/CR-2012001350 dated 30/12/2020 which is valid up to 31 /07/2021. The

202

6

Sr. Points Examined Remarks

copy of consent to operate of each year. This clearly shows that respondent no. 10 have not obtain renewal consent to operate certificate. This means respondent no. 10 functions illegally. The information

received through RTI dated 02/03/ 2020 is annexed here with annexure c

copy of the Renewal of Consent is attached as an Annexure-1. The details of earlier consent status and application date for obtaining consent is annexed as an Annexure-II.

1. MPCB has granted consent to operate for 3000 TCD cane crushing capacity on 19.09.2018 which was valid up to 31.07.2019.

2. MPCB has further, granted consent to operate for 3500 TCD cane crushing capacity on 19.09.2018 which was valid up to 31.07.2019.

3. Industry has applied for renewal of consent on Oct 3, 2019 and MPCB has granted consent to operate for 6500 TCD cane crushing capacity on 10.07.2020 which was valid up to 31 .07.2020.

4. After expiry of consent, Industry has applied for renewal of consent on Sep. 10,2020 and MPCB has granted consent to operate for 6500 TCD cane crushing capacity on 30.12.2020 which was valid up to 31 .07.2020.

203

7

Sr. Points Examined Remarks

Industry is irregular in applying renewal of consent of the MPCB. Consent and application copies for consent are attached and annexed as an Annexure-I.

A

1. Industry applied for renewal of consent to operate in time on 21.05.2019 and 11.05.2021.

2. Consents were applied and obtained before start of each crushing season. [ Ax. R2]

2 The applicant states and submitted that, as per the information received

through RTI Respondent no. 10 fails to comply with the post environmental clearance which is mandatory as per the norms rules and regulation of pollution control board. Post environmental clearance is obtained it is

mandatory to publish the same in a local newspaper within six months. But Responded no. 10 obtained environmental clearance from concern authority but not publish local newspaper till date which is violated from the norms and conditions of environmental

clearance. After receiving environmental clearance from the concerned

The State Environment Impact Assessment Authority (SEIAA) has

granted Environmental Clearance to the respondent Industry on 03/12/2016 vide letter SEAC-2016/CR-220/TC-2. The copy of the Environmental Clearance is attached as an Annexure- II

The Respondent Industry had published a Public Notice about the receipt of the Environmental Clearance (EC) from SEIAA on 03/1 2/2016 in English language as well as in Vernacular language i.e. in Marathi in Daily Pawana

Samachar on 10/12/2016. A copy of the Public Notice (Marathi and English) dated 10/12/2016 is

204

8

Sr. Points Examined Remarks

authority, it is mandatory duty of factory to submit the detailed report stating the compliance of pollution control to authority from home it has received environmental clearance search report is to be

submitted after 6 months from the date of receiving environmental clearance report is to be submitted to pollution control board and state level appraisal committee which gives environmental clearance but respondent number 10

has failed to comply the same till date the information received through RTI dated 02/03/2020 is a annexed with annexure b

attached herewith as an Annexure – III

However, as per EC conditions respondent industry has not submitted half yearly compliance reports in respect of the stipulated prior environmental clearance terms and conditions in hard and soft copies to MPCB and Environment Department, GOM, Mumbai.

A

1. Respondent published advertisement as and by way of Public Notice at Dainik Pavana on dated 10.12. 2016 in both languages i.e., Marathi and English in a

local newspaper.

2. Respondent circulated the EC copy to local authority i.e., Grampanchayat Sansar Village on-15.12.2016

3. Respondent uploaded the EC Copy on our sugar factory website www.shrichhatrapatisugars.com

4. Respondent also submitting the six-monthly compliance report to concerned authorities like MPCB and MOEF&CC Regional office Nagpur. [ Ax. R3 &

R12]

205

9

Sr. Points Examined Remarks

3 The Applicant states and submit that, as per the information received through RTI further the detailed report consists of JVS sampling, Air Stack Monitoring, Zero Liquid Discharge, Zero Emission

etc. Also, it is necessary to see whether a Factory functions as per the rules - and regulations framed by the MPCB. In the present case, it seems that Respondent No.10 has failed to submit the detailed report stating the above

facts. Although report which is presented to us severely exceeding the desired parameter of wastewater and Air. The information received through RTI dt. 02.0312020 is annexed herewith Annexure B.

Total industrial effluent generated from industry is 775 m3/d. Industry has provided ETP in the form of primary, secondary, tertiary of 1000 m3/d capacity to treat the effluent generated from

process.

MPCB had carried out JVS sampling of the ETP outlet of the respondent Industry. The analysis results dated,27/01/2020 and 07/01/2021 are observed within consented limit. The copy of analysis

results is attached and annexed herewith as an Annexure- IV.

A

1. Respondent is achieving Zero Liquid Discharge (ZLD) standard by providing 1000 m3/d effluent treatment plant and bilateral agreement with shareholder farmers.

2. MPCB JVS reports dated 27/01/2020 and 07/01/2021 are within prescribed consented norms. [Ax. R4]

4 The Applicant states and submit that, as per the

information received through RTI the Respondent No. 10 failed to install Wet

In sugar factory there are 5 boilers of 70, 35, 20, 20,

35 TPH capacity. Bagasse is used as fuel for all boilers

206

10

Sr. Points Examined Remarks

Scrubber System to old boiler (3500 TCD Factory). As per the information provided by the Respondent No. 1 Applicant found only purchase order proposals which were made in the year 2017, but till date

those systems are not installed in the Factory and also there are no approvals I any work done with respect to same by the concerned authority of the Respondent No. 10 on those purchase order proposals. That means the Respondent

No. 10 is hiding the Air Pollution from MPCB and CPCB which is caused by its daily functioning and directly discharges highly polluted air in the surrounding. The information received through RTI dt. 02/03/2020 is annexed herewith

annexure B.

A) As air pollution control system industry has provided common ESP as air pollution control device followed by 76 Meter stack for new boilers of 70 and 35 TPH (for 3000 TCD).

B) The unit has provided common stack of 60 Meter height for rest of three boilers of capacity 20 TPH,20 TPH and 35 TPH respectively without any air pollution control device such as

dust collector / scrubber or ESP to control air pollution (3500 TCD).

Earlier industry had provided dust collector as air pollution control device to these boilers, however same was dismantled 3 years ago. Industry informed that dust collector was not functioning properly and were not getting the expected efficiency results. The unit decided to replace dust collector with by wet scrubber. In this regard, resolution has been passed

for the financial provisions in the meeting Board Directors, dated

207

11

Sr. Points Examined Remarks

23.12.2020. In this regard, a letter of unit is attached herewith as an Annexure -V.

On 11 .01 .2021 industry issued letter of intent to private agency to install

scrubber.

A

Industry has ESP for 3000 TCD boiler. Due to poor efficiency of Cyclone Dust Collecting System, other boiler was shut down for year 2018-2019 and 2019-2020.

Industry initiated the proposal for installing new wet–scrubber system, which will be installed in next 2 months; i.e., before December 2021 [ Ax. R5]

5 The Applicant states and submit that, as per the information received through RTI the Respondent No 10 has installed ETP (Effluent Treatment Plant) which is required for the treatment and disposal of effluent which is discharged

from the Factory. Respondent No 10 is permitted to function in the category of Zero Liquid Discharge (ZLD) which states that the wastewater which is discharged from the factory must be used by recycling it for the other

internal use of the Factory. But, from the information received Respondent No. 10 is improperly disposing the

As per consent granted by MPCB, treated effluent generated from co-generation plant 125 m3/d shall be recycled in process and accordingly, industry is recycling this trade effluent in process for makeup of spray pond

level.

However, industry has not provided flow meter to measure the quantity.

Trade Effluent generated from sugar factory is 650 m3/d and as per consent conditions same shall be disposed on land for

irrigation purpose.

Industry has made bilateral agreement with

208

12

Sr. Points Examined Remarks

effluents to the extent of 350 m3 to 1000 m3 per day outside the Factory premises which is contrary, to the ZLD category. But the Respondent No. 10 failed to abide the norms, rules and regulations which

are framed by the Pollution Control Board regarding the same. Also, Respondent No. 10 misleads MPCB permissions by giving us information that MPCB had given Respondent No. 10 permission to direct the discharge of wastewater

approximately 350 m3 to 1000 m3 per day outside the Factory premises in natural resources. The information received through RTI dt. 02/03/2020 is annexed herewith annexure C & D.

six farmers on 31.07.2017 for the disposal of trade effluent from sugar factory. The total area of land is 30.05 Acres. However, there is no validity period mentioned in the agreement.

If the generation exceeded in the process. then there is a need to have more land for disposal.

A

1. Industry already installed flow meter at outlet of ETP which is operative from the year 2017 and connected to MPCB portal on September 2021. Industry will also install additional flow meter for industrial recycling process with in next two months.

2. The treated effluent from sugar factory is much required commodity. It is available during the period from mid-October to March when regular rain water is not available. As such there is always demand from Member Famers for treated effluent water. Therefore,

Agreements don’t have expiry and are perpetual (open ended as required by Members). [Ax. R6]

209

13

Sr. Points Examined Remarks

6 The Applicant states and submit that, as per the information received through RTI the Respondent No 10 does not have facility to store wastewater in the Storage Tanks for 15 days in "No Demand Period"

according to rules and regulations of Maharashtra Pollution Control Board (MPCB).

Respondent no.10, the industrial unit has not provided 15 days storage capacity tank for the storage of treated effluent to take care during no demand for Irrigation as per CREP norms.

A

The 15 days storage tank is provided and the evidences submitted to the MPCB on 23.08.2021. [ Ax. R7]

7 Installed Online Continuous Emission Monitoring System (OCEMS). But when asked to provide the online readings and data of the OCEMS, the Respondent No. 10 fails to provide the data and moreover gives irresponsible answers that we don't have the data and

online readings. This means Respondent No 10 tends to create a strong suspicion regarding hiding of Pollution from MPCB and CPCB. Also. this OCEMS system is installed to only old boiler (3500 TCD Factory) whereas it is mandatory to

install another OCEMS System to new boiler (3000 TCD Factory). The

Respondent Industry has installed OCEMS for 20, 20 & 35 TPH boiler stack (3500TCD) and same is connected to MPCB and CPCB server.

However, respondent Industry, a unit has installed OCEMS for 75 &

35 TPH boiler stack since Nov. 2020 and same is not connected to MPCB and CPCB server.

OCEMS installed for ETP outlet for the parameters like pH, COD, BOD & TSS and connected to CPCB and MPCB portal.

However, as per protocol of OCEMS for sugar industry, a unit has provided flow meter which

210

14

Sr. Points Examined Remarks

information received through RTI dt. 02/03/2020 is annexed herewith Annexure E.

has not been connected to CPCB and MPCB portal.

Connectivity of OCEMS for 75 & 35 TPH boiler stack since Nov. 2020 is not done by respondent no. 10 i.e., respondent industry.

A

1. Respondent industry already installed OCEMS on 2017 for boiler and same is connected to MPCB and CPCB portal.

2. OCEMS data was not displayed to MPCB due to technical error of the system but same data was displayed to CPCB portal. Industry resolved the issue. Same fact already submitted to MPCB through our letter dated 07.08.2021.

2. Industry also installed OCEMS for ETP outlet and same is also connected to CPCB and MPCB portal.

3. Industry installed the common flow meter for ETP outlet. [Ax. R8]

8 The Applicant states and submit that, as per the information received

through RTI it is mandatory for a factory to store the Molasses in the Steel Tank "only" according to the rules and regulations framed by the MPCB/CPCB. But on the contrary as per the information received the Factory is storing approximately 15,000 MT

Molasses in "Pakka Pitt' instead of Steel Tank. The information received

Average molasses generation quantity is approx. 45000 MT/Annum.

Industry has provided steel tank to store molasses of capacity 5000 and 10,000 MT.

No molasses observed stored in Pakka pit.

211

15

Sr. Points Examined Remarks

through RTI dt. 02/03/2020 is annexed herewith Annexure C.

A

Respondent industry provided Pakka pits for molasses instead of steel tank and molasses was not stored elsewhere.

9 The Applicant states and submit that, as per the information received through RTI it is mandatory for a factory to install a CPU (Condensing Polishing Unit). But the Respondent No. 10 has failed to install the unit

irrespective of the warnings/instructions gives by the MPCB and CPCB.

Respondent Industry has not provided CPU (Condensing Polishing Unit).

A

Respondent industry using hot sugar condensate for the makeup of the cooling tower as well as the spray-pond makeup. Industry will complete the work of CPU before end of the crushing season- 2021-22. [Ax. R9]

10 The Applicant states and submit that, as per the information received through RTI it is mandatory for a factory to abide the rules and regulations of MPCB to control the Air, Water and Noise Pollution by the installing Pollution

Control Unit. Also, factory must avail an Alternate Electric Power Supply in

Industry has installed DG Set of Capacity 750 and 750 KVA for alternate electric power supply. The same is not included in Board's consent.

212

16

Sr. Points Examined Remarks

case to function for 24 hours. But Respondent No. 10 has not complied the above-mentioned aspects and has not installed DG set which required to control the noise pollution.

A

Respondent industry submitted the request of additional 750 kVA DG set along with renewal of consent to operate. It was not reflected in consent copy. Therefore, industry submitted the amendment application for the same. All DG sets sold in the market are compliant with the CPCB norms. [Ax. R10]

11 The Applicant states and

submits that, as per the information received through RTI from the information received Respondent No. 10 has not Obtained any NOC from the CGWA (Central ground Water Authority of India, Nagpur) which is required for usage and extraction of

ground water for the functioning of the factory

Industry is fulfilling its

water demand with withdrawing water from Nira Left Canal of Irrigation Department, Gov. Maharashtra for which industry has obtained permission from authority which was valid up to 31.07.2018.

The unit has applied for renewal for further period on 22.12.2020. Hence, CGWA NOC is not required.

A

1. Respondent industry do not require CGWA NOC as there is no usage of ground water.

2. Respondent industry receiving water supply from irrigation department. [ Ax. R11]

213

17

Sr. Points Examined Remarks

12 The Applicant states and submit that, as per the information received through RTI respondent No. 10 has not maintained the record regarding quarterly statement in respect of industries obligations

towards consent and pollution control with documentary evidence.

As per consent condition, the unit is not required to maintain quarterly statement towards consent and pollution control with documentary evidence.

A

Quarterly statement is not applicable to Respondent industry, as per the conditions of ‘Consent to Operate’.

NO SUBSTANTIAL QUESTION

RELATED TO ENVIRONMENT

7. There are many vague allegations and averments made,

but there is no specific cause of action mentioned in the

application and the date of that cause. Applicant has not

given any data of his own which prima facie at least would

show the violation vis-à-vis the condition of the

‘Environmental Clearance’ and/or the ‘Consent to Operate’.

8. Applicant is duty bound to show the direct violation of

specific statutory environmental obligation, by which

community at large is affected OR the gravity of damage to

environment or property has to be substantial OR damage

to public health is broadly measurable OR the alleged

environmental consequences should relate to specific

activity or a point source. Applicant’s vague allegations

fall flat on all these counts above.

214

18

9. Respondent states that none of the allegations made ab-

initio raise the ‘substantial question related to

environment’ and as specifically defined in The National

Green Tribunal Act 2010 u/s.2(m), as stated hereinabove.

PLURAL CAUSES OF ACTION RAISED ARE PROHIBITED

10. Respondent states that applicant has stated many

allegations as the causes of action in this one application.

Each of such cause has to qualify as ‘substantial question

related to environment’, to be within the jurisdiction of this

Hon’ble Tribunal. All these plural causes are

independent of each other, and hence can’t be clubbed

in one single application. e.g., the allegations are:

i. Respondent have not obtained renewal

consent to operate.

ii. Respondent improperly disposing the effluent

outside the premises.

iii. Respondent not obtained CGWA NOC

11. Further, raising of plural causes in one application, is

specifically forbidden by The National Green Tribunal

(Practices and Procedure) Rules 2011; Rule 14. As

such, applicant ought to have filed separate applications for

each of such causes. As such apart from only one single

cause of action, all other causes, in the form of allegations

and averments, will have to be ruled out and omitted from

the jurisdiction of this Hon’ble Tribunal and ambit of this

application.

215

12. There is no complaint related to environmental degradation

caused by industrial effluent or emissions from industry.

13. In light of facts and the submission by Respondent industry,

the Respondents submits that the application may be

disposed-of without keeping it pending anymore AND if

required with the additional appropriate directions as

deemed fit by this Hon'ble Tribunal.

Place: Baramati R~~No.10 X

Date : 22.10.2021 Shri. Chhatrapati SSK Ltd

AFFJ:DAVJ:T &. VERJ:FJ:CATION

I, Ashok Bhargav Jadhav , hereby state that I have verified the

submissions made above and documents/annexures enclosed. I

6.. tate that the contents of the above affidavit are true and correct --. ) ~ the best off my knowledge and as verified from the records

? 6' vailable with Industry. I have not suppressed any material fact. .\,

I have submitted this affidavit on solemn affirmation and oath.

Place: Baramati

\ ~ \,~ r-r.nn ~~/ X Respondent No. 10

Date: 22.10.2021 . hri. Chhatrapati SSK Ltd

Identified by & before me:

Scanned with CamScanner

216

20

REPLY TO REMARKS OF JOINT COMMITTEE

REPORT DATED 07.01.2021

Sr. Joint Committee Remarks Reply by respondent Industry

1 After expiry of consent on 31.07.2019 industry is in operation without making application for renewal for 63 days.

Answer submitted at point No.1 (A), Page No. 204

2 After expiry of consent on 31 .07.2020 industry is in operation without making application for renewal for 40 days.

Answer submitted at point No.1 (A), Page No. 204

3 As per EC conditions respondent industry has not submitted half yearly compliance reports in respect

of the stipulated prior environmental clearance terms and conditions in hard and soft copies to MPCB and Environment Department, GOM, Mumbai.

Answer submitted at point No.2 (A), Page No. 205

4 The unit has provided common stack of 60 Meter height for three boilers of capacity 20 TPH, 20 TPH and 35 TPH respectively without any air

pollution control device such as dust collector I scrubber or ESP to control air pollution (3500 TCD) since 2017.

Answer submitted at point No.4 (A), Page No. 208

5 Respondent industry has not provided flow meter to measure the quantity of treated effluent which is recycled in process.

Answer submitted at point No.5 (A):1, Page No. 209

6 Industry has made bilateral agreement with six farmers on 31 .07.2017 for the disposal of trade effluent from sugar factory. The total area of land is 30.05 Acres. If the generation exceeded in the process, then there is a need to have

Answer submitted at point No.5 (A):2, Page No. 209

216- A

21

more land for disposal. Also, there is no validity period mentioned in the agreement.

7 Respondent Industry has not provided 15 days storage capacity tank for the storage of treated effluent to take care during no demand for irrigation.

Answer submitted at point No.6 (A), Page No. 210

8 Respondent Industry has obtained 151 consent to operate for 3000 TCD Sugar & 18 MW co-generation on 19.09.2018, however installed OCEMS for 75 & 35 TPH boiler in Nov. 2020. This shows that more than two years two-month industry run boiler without OCEMS. Flow meter for ETP outlet is provided but not connected to CPCB, MPCB Portal. However, data availability for MPCB & CPCB server for OCEMS is 66.00 % and for OCEMS is 28.59 % for last crushing season (0 1/11/2020 to 01/04/2021 ) Report sheet enclosed as an Annexure -VI.

Answer submitted at point No.7 (A), Page No. 211

9 Respondent Industry has not provided CPU (Condensing Polishing Unit).

Answer submitted at point No.9 (A), Page No. 212

10 Industry has installed DG Set of Capacity 750 KVA for alternate electric power supply. However, same is not included in Board's consent.

Answer submitted at point No.10 (A), Page No. 213

216- B

129Ax. R1

T.C.

BEFORE THE NATIONAL GREEN TRIBUNAL

PRJNCIP AL BENCH, NEW DELHI

(Through Video Conferencing)

Original Application No. 63/2020 (WZ)

Vikarmsinh Manikarao Patil & Ors. Applicant(s)

Versus

Shri Chhatrapati Sahakari Sakhar

Karkhana Ltd. Bhawaninagar & Ors. --- Respondent(s)

Submission of Report by Joint Committee of CPCB, PMRDA and

MPCB in compliance of the Order passed by Hon'ble NGT

217

130BEFORE THE HON'BLE NATIONAL GREEN TRIBUNAL,

PRINCIPAL BENCH, NEW DELHI

ORIGINAL APPLICATION NO. 63/2020 (WZ)

INSPECTION REPORT OF

M/s. Chhatrapati Sahakari Sakhar Karkhana Ltd; 122, Bhavaninagar, Tal-lndapur, Dist.- Pune

1.0 BACKGROUND:

The Hon'ble National Green Tribunal (NGT), passed the following order dated 01 /1 0/2020, in the matter 0 . A. No. 63/2020,Vikarmsinh Manikarao Patil & Ors. Applicant (s) versus Shri Chhatrapati Sahakari Sakhar Karkhana Ltd. Bhavaninagar & Ors, Respondent (s).

1. By way of filing this application the applicant in person has raisedseveral issues with regard to the non-compliance of the Air(Prevention and Control) Act, 1981 and Water (Prevention andControl) Act, 1974 and discharge of effluent in open space, noncomplianceofihe consent to operate and other various allegationslevelled in the application.

2. The respondents are directed to file their reply within six weeks bye­mail at [email protected] preferably in the form of searchablePDF/ OCR Support PDF and not in the form of Image PDF.

3. We deem it just and proper to constitute a committee consisting (i)Representative, Central Pollution Control Board (CPCB) and (ii)Pune Metropolitan Region Development Authority and (iii)Representative of Maharashtra State Pollution Control Board(SPCB) and to direct them submit a factual and action taken report. Report be submitted within six weeks.

4. Let a report in the matter be filed by e-mail at judicial-nqt@;gov. in preferably in the form of searchable PDF/ OCR Support PDF andnot in the form of Image PDF.

5. List it on 15.01.2021.

In compliance with the aforesaid order of the Hon'ble NGT, a committee consisting

of he following members constituted for inspection of aforesaid unit and submission

of a factual report .

(a) Representative, Central Pollution Control Board (Sh. Shashikant Lokhande,

Scientist E, Regional Directorate, CPCB, Pune);

(b) Pune Metropolitan Region Development Authority (Shri. S.P. Kumbhar, SE

(Water Supply), PMRDA, Pune)

(c) Representative of Maharashtra State Pollution Control Board (Shri. Nitin Shinde,

1/c. Regional Officer, MPC Board, Pune, and Shri. Pratap Jagtap, Sub Regional

Officer, MPC Board, Pune-1)

218

131The committee members visited M/s. Chh~trapati Sahakari Sakhar Karkhana

Ltd ; 122, Bhavaninagar, Tal-lndapur, Dist- Pune on January 71h, 2021. The unit is

one of the oldest sugar factories in Maharashtra which is commissioned in 1956.

Present crane crushing capacity of sugar is 6500 TCD. Present consent is valid up

to 31 .07.2021 . Present status report is as below: -

Observations:

Sr. Point Examined Remarks No. 1 The Applicant states and submit The Respondent Industry has obtained Consent to

that, as per the information Operate from the Maharashtra Pollution Control Board received through RTI the (MPCB). The renewa l of Consent is granted by the Respondent No. 10 failed to MPCB vide no. Format 1.0/CAC/UAN No. MPCB­obtain prior consent to operate CONSENT-0000094643/CR-2012001350 dated which is renewed after its 30/12/2020 which is valid up to 31 /07/2021 . The copy of expiration. But the Respondent the Renewal of Consent is attached as an Annexure-1. No. 10 provides only Electronic The details of earlier consent status and application Acknowledgement Receipt of date for obtaining consent is annexed as an Annexure­consent application instead of II

2

approved consents and fa iled to provide renewal copies of 1. MPCB has granted consent to operate for 3000 TCD consent to operate of each year. cane crushing capacity on 19.09.2018 which was This clearly shows that validupto31 .07.2019. Respondent No. 10 have not 2. MPCB has further, granted consent to operate for obtained renewal consent to 3500 TCD cane crushing capacity on 19.09.2018 operate certificate. This means which was valid up to 31.07.2019. Respondent No. 10 functions 3. Industry has applied for renewal of consent on Oct illegally. The information 3, 2019 and MPCB has granted consent to operate received through RTI dt. for 6500 TCD cane crushing capacity on 10.07.2020 02/03/2020 is annexed herewith which was valid up to 31 .07.2020. annexure c. 4. After expiry of consent, Industry has applied for

The Applicant states and submit -that, as per the information received through RTI the Respondent No. 10 fa iled to comply with the Post Environmental Clearance which is mandatory as per the norms, rules and regulations of Pollution -Control Board. Once Post Environmental Clearance is obtained it is mandatory to publish the same in the local newspaper within six months. But Respondent No. 1 0 obtained Environmental Clearance from the concerned authority but not published in the local newspaper -till date which is violation for norms and conditions of Environmental Clearance. After

renewal of consent on Sep. 10,2020 and MPCB has granted consent to operate for 6500 TCD cane crushing capacity on 30.12.2020 which was valid up to 31 .07.2020.

Industry is irregular in applying renewal of consent of the MPCB. Consent and application copies for consent are attached and annexed as an Annexure­!.

The State Environment Impact Assessment Authority (SEIAA) has granted Environmental Clearance to the respondent Industry on 03/12/2016 vide letter SEAC-2016/CR-220/TC-2. The copy of the Environmenta l Clearance is attached as an Annexure- II

The Respondent Industry had published a Public Notice about the receipt of the Environmental Clearance (EC) from SEIAA on 03/12/2016 in English language as well as in Vernacular language i.e. in Marathi in Daily Pawana Samachar on 10/12/2016. A copy of the Public Notice (Marathi and English) dated 10/12/2016 is attached herewith as an Annexure - Ill .

However, as per EC conditions respondent industry has not submitted half yearly compliance reports in respect of the stipulated prior environmental clearance terms and conditions in hard and soft

219

132

3

receiving Environmental Clearance from the concerned authority, it is mandatory duty of the Factory to submit the detailed report stating the compliance of pollution control to the authority from whom it has received Environmental Clearance. Such report is to be submitted after every six months from the date of receiving Environmental Clearance. Report is to be submitted to MPCB and State Level Appraisal Committee which gives Environmental Clearance. But Respondent No. 1 0 has failed to comply the same till date. The information received through RTI dt. 0210312020 is annexed herewith annexure B.

The Applicant states and submit -that, as per the information received through RTI further the detailed report consists of JVS sampling, Air Stack Monitoring, Zero Liquid Discharge, Zero Emission etc. Also, it is necessary to see whether a Factory functions as per the rules -and regulations framed by the MPCB. In the present case, it seems that Respondent No.1 0 has failed to submit the detailed report stating the above facts. Although report which is presented to us severely exceeding the desired parameter of wastewater and Air. The information received through RTI dt. 02.0312020 is annexed herewith Annexure B.

copies to MPCB and Environment Department, GOM, Mumbai.

Total industrial effluent generated from industry is 775 m31d. Industry has provided ETP in the form of primary, secondary, tertiary of 1 000 m31d capacity to treat the effluent generated from process.

MPCB had carried out JVS sampling of the ETP outlet of the respondent Industry. The analysis results dated,2710112020 and 0710112021are observed within consented limit. The copy of analysis results is attached and annexed herewith as an Annexure- IV.

4 The Applicant states and submit that, as per the information - In sugar factory there are 5 boilers of 70, 35, 20, 20, received through RTI the 35 TPH capacity. Bagasse is used as fuel for all Respondent No. 10 failed to boilers. install Wet Scrubber System to old boiler (3500 TCD Factory). A) As air pollution control system industry has provided As per the information provided common ESP as air pollutioncontrol device followed by the Respondent No. 1 by 76 Meter stack for new boilers of 70 and 35 Applicant found only purchase TPH(for 3000 TCD). order proposals which were made in the year 2017, but till B) The unit has provided common stack of 60 Meter date those systems are not height for rest ofthree boilers of capacity 20 TPH,20 installed in the Factory and also TPH and 35 TPH respectivelywithoutany air there are no approvals I any work pollution control device such as dust collector I done with respect to same by the scrubber or ESPto control air pollution (3500 TCD). concerned authority of the Respondent No. 10 on those - Earlier industry had provided dust collector as air purchase order proposals. That pollution control device to these boilers, however means the Respondent No. 10 is same was dismantled3 years ago. Industry informed hiding the Air Pollution from that dust collector was not functioning properly and MPCB and CPCB which is were not getting the expected efficiency results. The

220

133

5

6

7

caused by its daily functioning and directly discharges highly polluted air in the surrounding. The information received through RTI dt. 02/03/2020 is annexed herewith annexure B.

The Applicant states and submit -that, as per the information received through RTI the Respondent No. 10 has installed ETP (Effluent Treatment Plant) which is required for the treatment and disposal of effluent which is discharged from the -Factory. Respondent No. 10 is permitted to function in the category of Zero Liquid Discharge (ZLD) which states -that the wastewater which is discharged from the factory must be used by recycling it for the other internal use of the Factory. But, from the information -received Respondent No. 1 0 is improperly disposing the effluents to the extent of 350 m3 to 1 000 m3 per day outside the Factory premises which is contrary , to the ZLD category. But the Respondent No. 1 0 failed -to abide the norms, rules and regulations which are framed by the Pollution Control Board regarding the same. Also, Respondent No. 1 0 misleads MPCB permissions by giving us information that MPCB had given Respondent No. 1 0 permission to direct the discharge of wastewater approximately 350 m3 to 1 000 m3 per day outside the Factory premises in natural resources. The information received through RTI dt. 02/03/2020 is annexed herewith annexure C& D.

The Applicant states and submit -that, as per the information received through RTI the Respondent No. 1 0 does not have facility to store wastewater in the Storage Tanks for 15 days in "No Demand Period" according to rules and regulations of Maharashtra Pollution Control Board (MPCB).

The Applicant states and submit -that, as per the information received through RTI , it is seen that the Respondent No. 10 has

unit decided to replace dust collector with by wet scrubber. In this regard , resolution has been passed for the financial provisions in the meeting Board Directors, dated 23.12.2020. In this regard, a letter of unit is attached herewith as an Annexure -V .. On 11 .01 .2021 industry issued letter of intent to private agency to install scrubber.

As perconsent granted by MPCB, treated effluent generated from co-generation plant 125 m3fd shall be recycled in process and accordingly, industryis recycling this trade effluent in process for makeup of spray pond level.

However, industry has not provided flow meter to measure the quantity.

Trade Effluent generated from sugar factory is 650 m3/d and as per consent conditions same shall be disposed on land for irrigation purpose.

Industry has made bilateral agreement with six farmers on 31 .07.2017 for the disposal of trade effluent from sugar factory . The total area of land is 30.05 Acres. However, there is no validity period mentioned in the agreement.

If the generation exceeded in the process, then there is a need to have more land for disposal.

Respondent no. 10, the industrial unit has not provided 15 days storage capacity tank for the storage of treated effluent to take care during no demand for Irrigation as per CREP norms.

Respondent Industry has installed OCEMS for 20, 20 & 35 TPH boiler stack (3500TCD) and same is connected to MPCB and CPCB server.

s

221

134

8

9

10

installed Online Continuous -Emission Monitoring System (OCEMS). But when asked to provide the online readings and data of the OCEMS, the Respondent No. 10 fails to provide the data and moreover -gives irresponsible answers that we don't have the data and online readings. This means Respondent No. 10 tends to create a strong suspicion regarding hiding of Pollution from MPCB and CPCB. Also, this -OCEMS system is installed to only old boiler (3500 TCD Factory) whereas it is mandatory to install another OCEMS System to new boiler (3000 TCD Factory). The information received through RTI dt. 02/03/2020 is annexed herewith annexure E.

The Applicant states and submit -that, as per the information received through RTI it is mandatory for a factory to store -the Molasses in the Steel Tank "only" according to the rules and regulations framed by the -MPCB/CPCB. But on the contrary as per the information received the Factory is storing approximately 15,000 MT Molasses in "Pakka Pitt" instead of Steel Tank. The information received through RTI dt. 02/03/2020 is annexed herewith annexure C.

The Applicant states and submit -that, as per the information received through RTI it is mandatory for a factory to install a CPU (Condensing Polishing Unit). But the Respondent No. 10 has failed to install the unit irrespective of the warnings/instructions gives by the MPCB and CPCB.

The Applicant states and submit -that, as per the information received through RTI it is -mandatory for a factory to abide the rules and regulations of MPCB to control the Air, Water and Noise Pollution by the installing Pollution Control Unit. Also, factory must avail an Alternate Electric Power Supply in case to function for 24 hours. But Respondent No. 1 0 has not complied the above-mentioned aspects and has not installed DG

However, respondent Industry, a unit has installed OCEMS for 75 & 35 TPH boiler stack since Nov. 2020and same is not connected to MPCB and CPCB server.

OCEMS installed for ETP outlet for the parameters like pH, COD, BOD & TSS and connected to CPCB and MPCB portal. However, as per protocol of OCEMS for sugar industry, a unit has provided flow meter which has not been connected to CPCB and MPCB portal.

Connectivity of OCEMS for 75 & 35 TPH boiler stack since Nov. 2020 is not done by respondent no. 10 i.e. respondent industry.

Average molasses generation quantity is approx. 45000 MT/Annum.

Industry has provided steel tank to store molasses of capacity 5000 and 10,000 MT.

No molasses observed stored in pakka pit.

Respondent Industry has not provided CPU (Condensing Polishing Unit).

Industry has installed DG Set of Capacity 750 and 750 KVA for alternate electric power supply. The same is not included in Board's consent.

222

135

11

12

set which is required to control the Noise Pollution.

The Applicant states and submit -that, as per the information received through RTI from the information received Respondent No. 1 0 has not Obtained any NOC from the -CGWA (Central Ground water Authority of India, Nagpur) which is required for usage and extraction of ground water for the functioning of the factory .

The Applicant states and submit -that, as per the information received through RTI respondent No.1 0 has not maintained the record regarding quarterly statements in respect of industries obligations towards consent and pollution control with documentary evidence.

Remarks of committee: -

Industry is fulfilling its water demand by withdrawing water from Nira Left Cannel of Irrigation Department, Gov. of Maharashtra for which industry had obtained permission from authority which was valid up to 31 .07.2018. The unit has applied for renewal for further period on 22.12.2020. Hence, CGWA NOC is not required.

As per consent conditions, the unit is not required to maintain quarterly statement towards consent and pollution control with documentary evidence.

1. After expiry of consent on 31 .07.2019 indus try is in operation without making

application for renewal for 63 days.

2. After expiry of consent on 31 .07.2020 industry is in operation without making

application for renewal for 40 days.

3. As per EC conditions respondent industry has not submitted half yearly

compliance reports in respect of the stipulated prior environmental clearance

terms and conditions in hard and soft copies to MPCB and Environment

Department, GOM, Mumbai.

4. The unit has provided common stack of 60 Meter height for three boilers of

capacity 20 TPH, 20 TPH and 35 TPH respectively without any air pollution

control device such as dust collector I scrubber or ESP to control air pollution

(3500 TCD) since 2017.

5. Respondent industry has not provided flow meter to measure the quantity of

treated effluent which is recycled in process.

6. Industry has made bilateral agreement with six farmers on 31 .07.2017 for the

disposal of trade effluent from sugar factory. The total area of land is 30.05

Acres. If the generation exceeded in the process, then there is a need to have

more land for disposal. Also, there is no validity period mentioned in the

agreement.

223

1367. Respondent Industry has not provided 15 days storage capacity tank for the

storage of treated effluent to take care during no demand for irrigation.

8. Respondent Industry has obtained 151 consent to operate for 3000 TCD Sugar

& 18 MW co-generation on 19.09.2018, however installed OCEMS for 75 & 35

TPH boiler in Nov. 2020. This shows that more than two years two-month

industry run boiler without OCEMS. Flow meter for ETP outlet is provided but

not connected to CPCB, MPCB Portal. However, data availability for MPCB &

CPCB server for OCEMS is 66.00 % and for OCEMS is 28.59 % for last

crushing season (0 1/11/2020 to 01/04/2021 ) Report sheet enclosed as an

Annexure -VI .

9. Respondent Industry has not provided CPU (Condensing Polishing Unit).

10. Industry has installed DG Set of Capacity 750 KVA for alternate electric power

supply. However, same is not included in Board's consent.

Recommendation:

Considering , the above non compliances and violations, MPCB should initiate

action against the industry. Further, MPCB should ensure that the industry initiate

the remedial measures.

(Pratap agtap) Sub Regional Officer, MPC Board, Pune-1

~v/~) (S.P. Kumbhar)

~t.-SE (Water Supply),

PMRDA, Pune

(Nitin Shinde) 1/c. Regional Officer, MPC Board, Pune

~ (Shashikant Lokhande)

Scientist E, CPCB, Pune

224

137

MAHARASHTRA POLLUTION CONTROL BOARD Tel: 24010706/24010437 Fax:24023516 Website: http://mpcb.gov .fn Email: cac-c:[email protected]

Katpataru Point, 2nd and 4th floor, Opp. Cine Planet Cinema, Near Slon Circle, Slon (E), Mumbai-400022

No:- Formatl.O/CAC/UAN No.MPCB­CONSENT-0000094643/CR - 26\ 2e:>0 \35 0 To, Shrl Chhatrapati Sahakari Sakhar Ltd. 122,Bhavanlnagar Tal -lndapur Dist-Pune.

Sub: Renewal of Consent for 6500 TCD & 18 MW MW Co-gen unit Under L.S.I RED Category

Ref: 1. Renewal of Consent granted by the Board vide No. CAC/ UAN NO. MPCBCONSENT-0000073543/C0-2007000691 dtd. 10.07.2020.

2. Minutes of CAC Meeting dtd. 13.11.2020.

Your application No.MPCB-CONSENT-0000094643 Dated 10.09.2020

For: grant of Consent to Renewal under Section 26 of the Water (Prevention & Control of Pollution} Act, 1974 & under Section 21 of the Air (Prevention & Control of Pollution} Act, 1981 and Authorization under Rule 6 of the Hazardous & Other Wastes (Management & Transboundary Movement) Rules 2016 is considered and the consent is hereby granted subject to the following terms and conditions and as detailed in the schedule I, II, Ill & IV annexed to this order:

1. The Consent to Renewal is granted upto: .31.07.2021

2. The capital investment of the in·dustry is Rs.223.3607 Crs. (As per C.A Certificate submitted by industry).

3. Consent is valid for the manufacture of:

SrNo Product Maximum Quantity UOM

1 White Crystal Sugar 21695 MT/M

2 Bagasse 56970 MT/M

3 Pressmud 7970 MT/M

4 Molasses 7970 MT/M /

5 Electricity 18 MW

(The cane crushing capcity of Sugar Industry shall not exceed 6500 TCD.) 4. Conditions under Water (P&CP) Act, 1974 for discharge of effluent:

1. Trade effluent 775

2. Domestic effluent 16

As per Schedule -I

As per Schedule - I

125 CMD recycle & 650 CMD on land for irrigation.

on land for gardening I irrigation

Page 1 of ll

225

138

5. Conditions under the Air (P& CP) Act, 1981 for air emissions:

Stack Description of stack I Number of Standards to be No. .. :.[ · source .. :-... ·.·:·. ·. Stack·. achieved I :If: •• ~

1 75 TPH & 35 TPH 1 As per Schedule -II

2 20 TPH, 20 TPH and 35 TPH 1 As per Schedule -II

6. Conditions about Non Hazardous Wastes:

1 ETP sludge 200 Kg/Day Collection & Storage Manure

2 Boiler Ash 15 MT/M Collection & Sale Sold to Shareholders

7. Conditions under Hazardous & Other Wastes (M & T M) Rules 2008 for treatment and disposal of hazardous waste:

Sr .' . i Type of :~·~ · HW , Quan~lty &.· Treatment Disposal No · Waste :''~·,.~ Category. · ·, UoM _i_ __ ~_._ _ __

• 5.1 Used or spent oil

300 Kg/M Recycle Sale to Authorized recycler.

The applicant shall ensure disposal to the Actual user having permissions under Rule 9 of Hazardous and other Waste (M & TM) Rules, 2016.

a. The applicant shall properly collect. transport & regularly dispose of the hazardous waste to CHWTSDF, in compliance of the Hazardous & Other Wastes (Management & Transboundry Movement) Rules, 2016 and keep proper manifest thereof.

8. The Board reserves the right to revieW, al1)end, suspend, revoke etc. this consent and the same shall be binding on the industry: ..

' ~ h 9. This consent should not be construed as exemption from obtaining necessary

NOC/permission from any other Government authorities.

10. Industry shall connect online CMS data as per CPCB guidelines to CPCB & MPCB Servers.

11. Industry shall stop production activity voluntarily in case of failure of operation and maintenance of the ETP system as preventive measures.

12. Industry shall extend all existing BGs towards O&M of pollution control systems and towards compliance of the Consent conditions.

13. This consent is issued as per the Consent Appraisal Committee meeting dated 13.11.2020.

14. To improve water economy, PP shall submit detail water budget along with proposal towards recycling of treated effluent to the maximum extent including excess condensate into the process to reduce freshwater consumption, within a period of 3 months with activity bar chart.

COHSENT.0000094643 Page 2 of 11

\0

226

139

15. The applicant shall make an application for renewal of the consent at least 60 days before the date of the expiry of the consent.

For and on behalf of the Maharashtra Pollution Control Board.

Received Consent fee of -

Copy to:

~~ (Ashok Shingare lAS),

Member Secretary

1. Reg ional Officer, MPCB, Pune and Sub-Regional Officer, MPCB, Pune I

- They are directed to ensure the compliance of the consent conditions. 2. Chief Accounts Officer, MPCB,Sion, Mumbai 3. CC/CAC desk - for record & website updation purposes.

Page 3 of 11

\ \

227

140

SCHEDULE-I Terms & conditions for compliance of Water Pollution Control:

1) A] As per your application, you have Provided Effluent Treatment Plant (ETP) of designed capacity of 1000.00 CMD consisting of Primary, Secondary, Tertiary for the treatment of 775.00 CMD industrial effluent

B] Industry shall provide CPU for recycle/reuse of treated effluent.

C) The Applicant shall operate the effluent treatment plant (ETP) to treat the trade effluent so as to achieve the following standards prescribed by the Board or under EP Act, 1986 and Rules made there under from time to time, whichever is stringent.

. . Sr. No. ·

' ' ":: .... ~= ~·=·.-;! < . Parameters Limiting concentration not to exceed in

·' mg/1, except for pH • I ,~I~ w ,.

(1) pH 5.5-9.0

(2) Oil & Grease 10

(3) BOD {3 days 27°(1 100

(4) Sulphate 1000

(5) Suspended Solids 100

(6) COD 250

(7) Chloride 600

(8) Total Dissolved Solids 2100

D] The treated effluent 650.00 CMD shall be disposed on land for irrigation on 23 .00 hectares of own land /as per the bilateral agreement with farmers. In no any case trea,ted/untreated effluent shall find Its way outside the factory premises 'directly or indirectly.

E] Industry shall operate Online Continuous Emission Monitoring System (OCEMS) and shall transmit Online Continuous Emission Monitoring System (OCEMS) data to Board's server directly through the data logger without any intermediate server.

F) Trade effluent of 125.00 CMO generated from Co-gen shall be 100% recycle in process.

G) CREP conditions for Sugar Factory

i. Operation of ETP shall be started at least one month before starting of cane crushing to achieve desired MLSS. So as to meet prescribed standards from day one the operation of mill.

ii. Waste water generation shall be reduced to 100 liters per tone of cane crushed.

iii. Industry shall achieve zero discharge into in land surface water bodies.

iv. 15 days' storage capacity tank shall be provided for treated effluent to take care during no demand for irrigation.

H) Industry to make necessary arrangement to cover the effluent collection system and to avoid the ingress of Bagasse and other

material. ~~

Page 4 of 11

12.

228

141

I] The unit shall operate ETP even after completion of the crushing season so that any effluent generated during washing & maintenance activity is to be discharged after proper treatment.

J] The unit shall optimize water use in Industrial process & maintain records.

2) A] As per your application, you have provided septic tank and soak pit for

3)

4)

5) (i)

(li)

(iii)

(lv)

(V)

(vi)

the treatment of 16.00 CMO sewage.

B] The applicant shall operate sewage treatment system to treat sewage so as to achieve the following standards/ prescribed under EP Act 1986 and rules made under time to time, whichever is stringent.

1 Suspended Solids Not to exceed 100 mg/1

2 BOD 3 days (2JOC) Not to exceed 100 mg/1

C] The treated sewage shall be 100% reused/recycled for gardening purpose within premise. In no any case, sewage shall find Its way outside Company's premises.

The Industry shall have bilateral agreement with the farmers on whose land the treated effluent is used for irrigation purposes and a copy of the agreements with validity shall be submitted to the Regional/Sub- Regional Office of the Board.

The industry shall create Environmental Cell by appointing an Environmental Engineer, Chemist and Agriculture e)(pert for looking after day to day activities related to Environment and irrigation field where treated effluent is used for irrigation.

CONDITIONS FOR MOLASSES STORAGE: . . The molasses shall be properly collected and stored in steel tanks which shall be leak proof. At no stage of handling of molasses, there shall be leakage or spillage.

The capacity of tanks for storage of molasses shall be such that it will take care of bumper production of sugar, non-lifting of molasses etc.

All the area on which molasses are stored and handled should be provided with drain for diverting the spills to the treatment plant/ molasses tank. Suitable arrangements for accidental discharges of molasses from the tanks shall be provided to contain the same within factory premises.

Destruction of molasses and its disposal shall not be done without specific permission in writing from the authorized officer of the Board. Intimation of Intention to destroy or dispose of the molasses shall be given to the Board at least 15 (fifteen) days in advance by registered post under intimation to the Sub-Regional officer and Regional officer of the Board under whose jurisdiction the factory Is situated.

The storage tanks shall be kept in good conditions all the year round with adequate maintenance. The tanks size and capacity per em, height, total capacity in tonnes shall be displayed prominently near /on the tank.

The above conditions shall be in addition to and not in derogation of the provisions contained in the "Bombay Molasses Rules, 19557 and "Maharashtra Molasses Storage and Supply Regulation, 1965?.

Page 5 of 11

12

229

142

6} The Applicant shall provide Specific Water Pollution control system as per the conditions of EP Act , 1986 and rule made there und er from time to t ime/ Environmental Clearance 1 CREP guidelines if applicable.

7) The Board reserves its rights to review plans, specifications or other data relating to plant setup for the treatment of waterworks for the purification there of & the system for the disposal of sewage or trade effluent or In connection with the grant of any consent conditions. The Applicant shall obtain prior consent of the Board to take steps to establish the unit or establish any treatment and disposal system or an extension or addition thereto.

8) The industry shall ensure replacement of pollution control system or its parts after expiry of its expected life as defined by manufacturer so as to ensure the compliance of standards and safety of the operation thereof.

9) The Applicant shall comply with the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and as amended, by installing water meters, and other provisions as contained in the said act:

sr. . . ~ ' ... ,. i Water consumption ·~ J: ~ . Purpose for water consumed ·-: ·~. N.o. • ,;_.:. I ~!1: r.;•l ;~ ; f ~ I ( '!,. '.~\< -: -. quantity (CMDJ

1. Industrial Cooling, spraying in mine pits or boiler 125.00 feed

2. Domestic purpose 20.00

3. Processing whereby water gets polluted & pollutants 484.00 are easily biodegradable

4. Processing whereby water gets polluted & pollutants

0.00 are not easily biodegradable and are toxic

5. Grandening 00 ... .

10) The Applicant shall provide Specific -wate~- Pollution control system as per the conditions of EP Act. 1986 and rule ·made there under from time to time/ Environmental Clearance/ CREP guidelines.

CONSENT·000009464l Page 6 of 11

230

143

SCHEDULE-II Terms & conditions for compliance of Air Pollution Control:

1) As per your application, you have provided the Air pollution control (APC) system and erected following stack(s) and observe the following fuel pattern-

1 Boiler (75 ESP 76 Bagasse 750 MT/Day 0.20 3000.00 TPH)

1 Boiler (35 ESP 76 Bagasse 350 MT/Day 0.20 1400.00 TPH)

2 Boiler(20 Dust

60 Bagasse 240 MT/Day 0.20 960.00 TPH) collecter

2 Boiler (20 Dust

60 Bagasse 240 MT/Day 0.20 960.00 TPH) collecter

2 Boi ler (35 Dust 60 Bagasse 350 MT/Day 0.20 1400.00 TPH) colfecter

2) The Applicant shall provide Specific Air Pollution control equipments as per the conditions of EP Act, 1986 and rule made there under from time to time/ Environmental Clearance I CREP guidelines.

1 The Applicant shalf provide ESP/ Bag filter/ Wet scrubber to the Bagasse fired boiler and Dust Collector to Sugar bagging section as an Air Pollution control equlpments OR as per the conditions of EP Act, 1986 and rule made there under from time to time I Environmental Clearance I CREP gui~eline~:· .

2 The applicant shall operate and maintain .above mentioned air pollution control s stem. so as to achieve the level of ollutants to the folfowin standards:

Total Particulate matter Not to exceed 150 mg/Nm3

3 The Applicant shalf obtain necessary prior permission for providing additional control equipment with necessary specifications and operation thereof or alteration or replacementJalteration well before its life come to an end or erection of new pollution control equipment.

4 The Board reserves its rights to vary all or any of the condition in the consent, if due to any technologica l improvement or otherwise such variation (including the change of any control equipment. other in whole or in part is necessary).

5 Industry should not use auxiliary fuel more than 15 % (as per amendment in EIA Notification 2009, power plant upto 15 MW based on Bio-mass and using auxiliary fuel as coal upto 15% are exempt.) as co-gen capacity is below 15 MW.

3) The Applicant shall obtain necessary prior permission for providing additional control equipment with necessary specifications and operation thereof or alteration or replacement/alteration well before Its life come to an end or erection of new pollution control equipment.

4) The Board reserves its rights to vary all or any of the condition In the consent, if due to any technological improvement or otherwise such variation (Including the change of any control equipment, other In whole or In part Is

necessary). ~~

Paoe 7 of 11

231

144

SCHEDULE-Ill Details of Bank Guarantees:

~ • " J'l. Amt of 4·:t:3 '· ~,, • ·!f. ~1 ;" :'t ~ ~( ~, Validity Sr~:, 1 Consent(C2~{5):. '·t BG~,. ~~. S~bm~ssion' · Jt~rpos~7:H . Compl!ance

No.3. ~01'_2~J .. :'i!.·;·fmposed ~~· ~~Per~~~ ~~ .,.-::_. ~f~~t::;1 Pertod Date

Towards compliance of Consent

1 C toR 1000000 15 conditions 31.07.2021 30.11.2021 days/extended & o & M of pollution control system.

15 days/ Towards 2 C toR 500000 Provision 31.07.2021 30.11.2021 extended of CPU

BG Forfeiture History

Page 8 of 11

\6

232

145

SCHEDULE-IV

General Condltionsi

1 The applicant shall provide facility fo r collection of environmental samples and samples of trade and sewage effluents, air emissions and hazardous waste to the Board staff at the terminal or designated points and shall pay to the Board for the services rendered in this behalf.

2 The applicant shall provide ports in the chimney/(s) and facilities such as ladder, platform etc . for mon itoring the ai r emiss ions and the same shall be open for inspection to/and for use of the Board's Staff. The chimney(s} vents attached to various sources of emission shall be designated by numbers such as S-1, S-2, etc. and these shall be painted/ displayed to facilitate identification.

3 Whenever due to any accident or other unforeseen act or even, such emissions occur or is apprehended to occur in excess of standards laid down, such information shall be forthwith Reported to Board, concerned Police Station, office of Directorate of Health Services, Department of Explosives, Inspectorate of Factories and Local Body. In case of failure of pollution control equipment, the production process connected to it shall be stopped.

4 The applicant shall provide an alternate electric power source sufficient to operate all pollution control facil ities installed to main tain compliance with the terms and conditions of the consent. In the absence, the applicant shall stop, reduce or otherwise, control production to abide by terms and conditions of this consent.

5 The firm shall submit to this office, the 30th day of September every year, the Environmental Statement Report for the financial year ending 31st March in the prescribed Form-V as per the provisions of rule 14 of the Environment (Protection) (Second Amendment) Rules, 1992.

6 The industry should comply with the·Hazardous & Other Wastes (M & TM) Rules, 2016 and submit the Annual Returns as per Rule 6(5) & 20(2) of Hazardous & Other Wastes (M & TM) Rules, 2016 for the preceding year April to March in Form-IV by 30th june of every year.

7 An inspection book shall be opened and made available to the Board's officers during their visit to the applicant.

8 The industry shall constitute an Environmental cell with qualified staff/personnel/agency to see the day to day compliance of consent condition towards Environment Protection.

9 The applicant shall install a separate meter showing the consumption of energy for operation of domestic and industrial effluent treatment plants and air pollution control system. A register showing consumption of chemica ls used for treatment shall be maintained.

10 The applicant shall bring minimum 33% of the available open land under green coverage/ plantation. The applicant shall submit a yearly statement by 30th September every year on available open plot area, number of trees surviving as on 31st March of the year and number of trees planted by September end.

11 The industry shall submit official e-mail address and any change will be duly informed to the MPCB.

12 Industry should monitor effluent quality, stack emissions and ambient air quality monthly/quarterly.

Page 9 ot ll

233

146

13 The Industry shall recycle/reprocess/reuse/recover Hazardous Waste as per the provision contain in t he H&OW(M&TM) Rules 20 16, which can be recycled/processed/ reused/ recovered and on ly waste which has to be tncinerated shall go to incineration and waste which can be used for land filling and cannot be recycled/ reprocessed etc. should go for that purpose, in order to reduce load on incineration and landfill site/environment.

14 Industry shall strict ly comply with the Water (P&CP) Act. 1974, Air (P&CP) Act,1981 and Environmental Protection Act,l986 and industry specific standard under EP Rules 1986 which are available on MPCB website(www.mpcb.gov.in).

15 Separate drainage system shall be provided for collection of trade and sewage effluents. Terminal manholes shall be provided at the end of the collection system with arrangement for measuring the flow. No effluent shall be admitted in the pipes/sewers downstream of the terminal manholes. No effluent shall find its way other than in designed and provided collection system.

16 Neither storm water nor discharge from other premises shall be allowed to mix with the effluents from the factory.

17. Conditions for D.G. Set

a) Noise from the D.G. Set should be controlled by providing an acoustic enclosure or by treating the room acoustically.

b) Industry should provide acoustic enclosure for control of noise. The acoustic enclosure/ acoustic treatment of the room should be designed for minimum 25 dB (A) insertion loss or for meeting the ambient noise standards, whichever is on higher side. A suitable exhaust muffler with insertion loss of 25 dB (A) shall also be provided. The measurement of insertion loss will be done at different points at 0.5 meters from acoustic enclosure/room and then average.

c) Industry should make efforts to bring down noise level due to DG set, outside industrial premises, within ambient noise requirements by proper sitting and control measures.

d) Installation of DG Set must be strictly in compliance with recommendations of DG Set manufacturer.

e) A proper routine and preventive maintenance procedure for DG set should be set and followed in consultation with the DG manufacturer which would help to prevent noise levels of DG set from deteriorating with use.

f) D.G. Set shall be operated only In case of power failure.

g) The applicant should not cause any nuisance in the surrounding area due to operation of D.G. Set.

h) The applicant shall comply with the notification of MoEFCC, India on Environment (Protect ion) second Amendment Rules vide GSR 37l(E) dated 17.05.2002 and its amendments regarding noise limit for generator sets run with diesel.

18 The industry should not cause any nuisance in surrounding area.

19 The industry shall take adequate measures fo r control of noise levels from its own sources within the premises so as to maintain ambient air quality standard in respect of noise to less than 75 dB (A) during day time and 70 dB (A) during night t ime. Day t ime Is reckoned in between 6 a.m. and 10 p.m. and night time is reckoned between 10 p.m. and 6 a.m.

20 The applicant shall maintain good housekeeping.

21 The non-hazardous solid waste ansing in the factory premises, sweepings, etc. be disposed of scientifically so as not to cause any nuisance I pollution. The applicant shall take necessary permissions from civic authorities for disposal of solid waste.

22 The applicant shall not change or alter the quantity, quality, the rate of discharge, temperature or the mode of the effluent/emissions or hazardous wastes or control equipment provided for without previous written permission of the Board. The Industry will not carry out any activity, for which this consent has not been granted/without prior consent

of the Board. ~~

Page 10 ot 11

234

147

23 The industry shall ensure that fugitive emissions from the activity are controlled so as to maintain clean and safe environment in and around the factory premises.

24 The industry shall achieve the National Ambient Air Quality standards prescribed vide Government of India, Notification dtd. 16.11.2009 as amended.

Page 11 of 11

lj

235

148MAHARASHTRA Mabarashtra Pollution Control Board

Application for Consent/ Authorisation

Sir. I{We hereby apply fort'

1. Consent to Establish/Operate/Renewal of consent under section 25 and 26 of the Water (Prevention & Control of Pollution) Act, 1974 as amended.

2. Consent to Establish/Operate/Renewal of consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981, as amended.

3. Authorization/renewal of authorization under Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, in connection with my/our/existing/proposed/altered/ additional manufacturing/processing activity from the premises as per the details given below.

Consent Information

UAN No: Application Date: Payment Received on:

MPCB-CONSENT-0000094643 jul 12, 2020 Sep 10, 2020

Industry Information

Consent To: Renewal (Normal)

Type of institution:

Industry

EC Reqd.

No

liN No.:

Industry Type: R12 Sugar ( excluding Khandsari)

EC Obtained

No

Submit to: SRO- Pune I

Category:

Red

EC Ref. No.

Whether construction-buildup area is more than 20, 000 No sq.mtr.(Existing Expansion Unit)

General Information

Industry Name: Shri Chhatrapati Sahakari Sakhar Ltd. Bhavaninagar Tal -lndapur Dist-Pune.

Gross Capital in lakhs

22336.07

Scale:

L.S.I

1. Name, designation, office address with Telephone/Fax numbers, e-mail of the Applicant Occupier/Industry/Institution I Local Body.

Name

GOVIND MAHADEV ANARSE

Designation MANAGING DIRECTOR

Area BHAVANINAGAR

Telephone

9075658383

Email [email protected]

Address

atpost-bhavaninaga r ta luka-indapur dist-pune

Taluka

INDAPUR

District

Pune

Fax 02118266253

Pan Number AAAAS3869G

2. (a) Name and location of the industrial unit/premises for which the application is made (Give revenue Survey Number/Plot number name ofTaluka and District, also telephone and fax number)

236

149

MAHARASHTRA POLLUTION CONTROL BOARD Tel : 24010706/24010437 Fax : 24023516 Website: http://mpcb.gov.in Email: [email protected]

Kalpataru Point , 2nd and 4th floor, Opp . Cine Planet Cine ma, Near Sion Circle, Sion {E), Mumbai-400022

No:- Formatl.O/CAC/UAN No.MPCB­CONSENT-0000073543/CO - ~. ~ 7 C' o 6 'I I To, Shri Chhatrapati Sahakari Sakhar Karkhana Ltd., 122,Bhavaninagar, Tal-lndapur Dist-Pune.

Date: ID\ 7/'U>'l.-()

Sub: Renewal of sugar unit of 6500 TCD sugar unit & 18 MW Cogeneration unit Under L.S.I RED Category

Ref : 1. Consent granted by the Board vide No. BO/CAC-CELL/UAN No. 0000030987/R/CAC-1809002013 19.09.2018.

2. Consent granted by the Board vide No. 80/CAC-CELL/UAN No. 0000030950/R/CAC-1809002014 dtd. 19.09.2018.

3. Minutes of CAC Meeting dtd.03.03.2020 & 04.03.2020

Your application No.MPCB-CONSENT-0000073543 Dated 03.10.2019

For: grant of Renewal of Consent under Section 26 of the Water (Prevention & Control of Pollu tion) Act. 1974 & under Section 21 of the Air (Prevention & Control of Pollution) Act. 1981 and Authorization under Rule 6 of the Hazardous & Other Wastes (Management & Transboundary Movement) Rules 2016 is considered and the consent is hereby granted subject to the following terms and conditions and as detailed in the schedule I, II, Ill & IV annexed to this order:

1. The Consent to Operate is granted upto: 31.07.2020

2 The capita l investment of the industry is Rs.205 Crs. (As per C.A Certificate submitted by industry) .

3. Consent is valid for the manufacture of:

SrNo Product Maximum Quantity UOM

1 White Crystal Sugar 21695 MT/M

2 Bagasse 56970 MT/M

3 Pressmud 7970 MT/M

4 Molasses 7970 MT/M

5 Electricity 18 MW

The Cane crushing capacity of Sugar unit shall not exceed 6500 TCD

4. Conditions under Water (P&CP) Act, 1974 for discharge of effluent:

As per Schedule -1

Page 1 of 11

2.\

237

150

onland for gardening I irrigation

5. Conditions under the Air (P& CP) Act, 1981 for air emissions:

Stack Description of stack 1 source Number of No. Stack

1 Boiler- 20 TPH, 20 TPH & 35 TPH 1

2 Boiler- 75 TPH & 35 TPH 1

6. Conditions about Non Hazardous Wastes:

7. Conditions under Hazardous & Other Wastes (M treatment and disposal of hazardous waste:

spent oil 300 Kg/M

Standards to be achieved

As per Schedule -II

As per Schedule -II

The applicant shall ensure disposal to the Actual user having permissions under Rule 9 of Hazardous and other Waste (M & TM) Rules, 2016.

a. The applicant shall properly collect. transport & regularly dispose of the hazardous waste to CHWTSDF, in compl iance of the Hazardous & Other Wastes (Management & Transboundry Movement) Rules. 2016 and keep proper manifest thereof.

8. The Boa rd reserves the right to review. amend, suspend, revoke etc . this consent and the same shall be binding on the industry.

9. Th is consent should not be construed as exemption from obtaining necessary NOC/permission from any other Government authorities.

10. Industry shall connect online CMS data as per CPCB guidelines to CPCB & MPCB Servers

11. Th 1s con sent 1s 1ssued as per the Consent Appra isal Committee meeting dated 03.03.2020.

12. PP shall submit presentation in respect of adequacy of pollution control systems and remedial steps taken to improve operation & maintenance of pollution control systems with in period of 3 months.

13. The applicant shall make an application for renewal of the consent at least 60 days before the date of the expiry of the consent.

For and on behalf of the Maharashtra Poll tion Control Board .

Page 2 of 11

238

151

Received Consent fee of -

Sr.No Amount(Rs.} Transaction/DR.No. Date I

Transaction Type

1 410000.00 5454061 03/10/2019 RTGS

2 34730.00 5457018 14/ 10/2019 RTGS

3 50000.00 MPCB-DR-0772 07/07/2020 RTGS

Copy to:

1. Regional Officer, MPCB, Pune and Sub-Regional Officer, MPCB, Pune I

- They are directed to ensure the compliance of the consent condi t ions.

They are d irected to forfe it the bank guarantee of Rs. 5 lakh & obtain top up BG of Rs . 10 Lakh from the industry

2. Chief Accounts Officer, MPCB,Sion, Mumbai

3. CC/CAC desk- for record & website updation purposer

~

Page 3 of 11

239

152

SCHEDULE-I Terms & conditions for compliance of Water Pollution Control:

1) A) As per your application, you have Provided Effluent Treatment Plant (ETP ) of designed capacity of 1000.00 CMD consisting of Primary, Secondary, Tertiary for the treatment of 775.00 CMD industrial effluent

B] The Applicant shall operate the effluent treatment plant (ETP) to treat the trade effluent so as to achieve the following standards prescribed by the Board or under EP Act , 1986 and Rules made there under from time to time, whichever is stringent.

Sr. No. Parameters Limiting concentration not to exceed in j mg/1, except for pH

(1 ) pH 5.5-9.0

(2) Oil & Grease 10

(3) BOD (3 days 2r " 100

(4 ) Sulphate 1000 (5) Suspended Solids 100

(6) coo 250

(7) Chloride 600 (8) Total Drssolved Solids 2100

C) The treated effluent 650.00 CMD shall be disposed on land for irrigation on 23 .00 hectares of own l and /as per the bilateral agreement with farmers. In no any case treated/untreated effluent shall find its way outside the factory premises directly or indirectly.

OJ Trade effluent of 125.00 CMD generated from Co-gen shall be 100% recycle in process.

E) CREP conditions for Sugar Factory

i. Operation of ETP shall be started at least one month before starting of cane crushing to achieve desired MLSS. So as to meet prescribed standards from day one the operation of mill.

ii. Waste water generation shall be reduced to 100 liters per tone of cane crushed.

iii. Industry shall achieve zero discharge into in land surface water bodies.

1v. 15 days' storage capacity tank shall be provided for treated effluent to take care during no demand for irrigation.

F] Industry to make necessary arrangement to cover the effluent collection system an d to avoid the ingress of Bagasse and other material.

G) The unit shall operate ETP even after completion of the crushing season so that any effluent generated during washing & maintenance activity is to be discharged after proper treatment.

he unit shall optimize water use in industrial process & maintain records.

Page 4 of 11

240

153

2) A] As per your application, you have provided septic tank and soak pit for the treatment of 16.00 CMD sewage.

B) The applicant shall operate sewage treatment system to treat sewage so as to achieve the following standards/ prescribed under EP Act 1986 and rules made under t ime to time, whichever is stringent.

1 Suspended Solids Not to exceed 100 mg/1

2 BOD 3 days (2JOC) Not to exceed 100 mg/1

C) The treated sewage shall be 100% reused/recycled for gardening purpose within premise. In no any case, sewage shall find its way outside Company's premises.

3) The industry shall have bilateral agreement with the farmers on whose land the treated effluent is used for Irrigation purposes and a copy of the agreements with validity shall be submitted to the Regional/Sub- Regional Office of the Board.

4) The industry shall create Environmental Cell by appointing an Environmental Engineer, Chemist and Agriculture expert for looking after day to day activities related to Envi ronment and irrigation field where treated effluent is used for irrigation.

5) CONDITIONS FOR MOLASSES STORAGE:

(i) The molasses shall be properly collected and stored in steel tanks which shall be leak proof. At no stage of handling of molasses, there shall be leakage or spillage.

(11) The capacity of tanks for storage of molasses sha ll be such that i t wi ll take care of bumper production of sugar. non-lifting of molasses etc.

(i ii) All the area on which molasses are stored and handled should be provided with drain for diverting the spills to the treatment plant/ molasses tank. Su itable arrangements for accidental discharges of molasses from t he tanks shall be provided to contain the same w1th1n factory prem1ses.

(1v) Dest ruct1on of molasses and its disposal shall not be done without specific permission m wnting from the authorized officer of the Board. Intimation of intention to destroy or dispose of the molasses shall be given to the Board at least 15 (fifteen) days in advance by registered post under intimation to the Sub-Regional officer and Regional officer of the Board under whose jurisdiction the factory is situated.

(v) The storage tanks shall be kept in good conditions all the year round with adequate maintenance. The tanks size and capacity per em, height, tota l capacity in tonnes shall be displayed prominently near /on the tank.

(vi) The above conditions shall be in add ition to and not in derogation of the provis ions contained in the "Bombay Molasses Ru les, 1955?? and " Maharashtra Molasses Storage and Supply Regulation, 1965??.

6) The Applicant shall provide Specific Water Pollution control system as per the co nd itions o f EP Act , 1986 and rule made there under from time to t ime/ Environmental Clearance 1 CREP guidelines if applicable.

7 J The Board reserves its rights to review plans, specifications or other data rela t ing to plant setup for the t reatment of waterworks for the purification there of & the system for the disposal of sewage or trade effluent or in connection with the grant of any consent conditions. The Appl icant shall obtain prior consent of the Boar to take steps to establish the unit or establish any treatment and disposal system or extension or addition thereto.

Page 5 of 11

2..S

241

154

8) The industry shall ensure replacement of pollution control system or its parts after expiry of its expected life as defined by manufacturer so as to ensure the compliance of standards and safety of the operation thereof.

9) The Applicant shall comply with the provisions of the Water (Prevention & Control of Pollution) Act. 197 4 and as amended, by installing water meters, and other provisions as contained in the sa id act:

Sr. ' Water consumption I

No. Purpose for water consumed quantity (CMD} I

1. Industrial Cooling, spraying in mine pits or boiler

125.00 feed

2. Domestic purpose 20.00

3 Proc essing whereby water gets pollu ted & pollutants

484.00 are easily biodegradable

4. Processmg whereby water gets polluted & pollutants

0.00 are not easily biodegradable and are toxic

5. Grandening 0

10) The Applicant shall provide Specific Water Pollution control system as per the cond itions o f EP Act , 1986 and rule made there under from time to time/ Environmental Clearance/ CREP guidelines.

Page 6 of 11

242

155

SCHEDULE-II Terms & cond itions for compliance of Air Pollution Control :

1) As per your appl ication, you have provided the Air pollution control (APC) system and erected following stack(s) and observe the following fuel pattern-

1 Boiler- 20 Wet

60 Bagasse 240 MT/Day 0.20 960.00 TPH Scrubber

1 Boiler - 20 Wet

60 Bagasse 240 MT/Day 0.20 960.00 TPH Scrubber

1 Boiler - 35 Wet

60 Bagasse 350 MT/Day 0.20 1400.00 TPH Scrubber

2 Boiler - 75

ESP 76 Bagasse 750 MT/Day 0.20 3000.00 TPH

2 Boiler· 35

ESP 76 Bagasse 350 MT/Day 0.20 1400.00 TPH

2) The Applicant shall provide Specific Air Pollution control equipments as per the conditions of EP Act, 1986 and rule made there under from time to time/ Envi ronmental Clearance I CREP guidelines.

1 The Applicant sha ll provide ESP/ Bag filter/ Wet scrubber to the Bagasse fi red boiler and Dust Collector to Sugar bagg ing section as an Air Pollution control equipments OR as per the conditions of EP Act. 1986 and rule made there under from time to time 1 Environmental Clearance I CREP guidelines.

2 The applicant shall operate and mainta in above mentioned air pollution control s stem. so as to achieve the level of ollutants to the followin standards:

Total Particulate matter Not to exceed 150 mg/Nm3

3 The Applicant shal l obta in necessary prior permiss ion for providing additiona l control equ1pment with necessary specifications and operation thereof or alteration or replacement/alteration well before 1ts life come to an end or erection of new po llution control equipment.

4 The Board reserves its rights to vary all or any of the condition in the consent, if due to any technological improvement or otherwise such variation {including the change of any control equipment, other in whole or in part is necessary).

5 Industry should not use auxil iary fuel more than 15 % (as per amendment in EIA Notification 2009, power plant upto 15 MW based on Bio-mass and using auxiliary fuel as coal upto 15% are exempt.) as co-gen capacity is below 15 MW.

3) The Applicant shall obtain necessary prior permission for providing additional control equipment with necessary specifications and operation thereof or alteration or replacement/alteration well before its life come to an end or erection of new pollution control equipment.

4) The Board reserves its rights to vary all or any of the condition In the consent, if due to any technological improvement or othe;wise s h variation (including the change of any control equipment, other in whole or in part is necessary) .

n hha!rapatl Sahakan Sakhar Karkhana ltd Bhavanlnagar TaJ.Indapur CONSENT-000007 3543

Page 7 of 11

243

156

SCHEDULE-Ill Details of Bank Guarantees:

Sr. Consent(C2E/C Amtof Submission Purpose Compliance Validity : BG No. 20/C2RJ lin posed Period ofBG Period Date

Towards compliance of Consent

1 C toR 1000000 15 Days conditions

31.07.2020 30.11.2020 & 0 & M of pollution control system.

Towards 2 C toR 500000 15 Days Provision 31.07.2020 30.11.2020

of CPU

BG Forfeiture History

Srno. Consent of BG Subml~s1on Purpose of BG BG · I Amount . Amount of Reason of

: lC2EIC20IC2RJ Imposed Per~od BG Forfeiture Forfeiture

1 C to R 500000

Towards compl iance of

Consent conditions &

o & M of pollution control system.

500000 JVS Exceedance

Page 8 of 11

244

157

SCHEDULE-IV

General Conditions:

1 The applicant shall provide facility for collection of environmental samples and samples of t rade and sewage effluents, air emissions and hazardous waste to the Board staff at the terminal or designated points and shall pay to the Board for the se rv1ces rendered in th is behalf.

2 The applica nt shall provide ports in the chimney/( s) and fac il it ies such as ladder, platform etc. for mon1tor1ng the a1r em issions and t he same shall be open for inspection to/and for use of the Board's Staff. The chimney(s) vents attached to various sources of emission shall be designated by numbers such as S-1, S-2, etc. and these shall be painted/ displayed to facilitate identification.

3 Whenever due to any accident or other unforeseen act or even, such emissions occur or is apprehended to occur in excess of standards la id down, such information shall be forthwith Reported to Board, concerned Police Station, office of Directorate of Health Services, Department of Explosives, Inspectorate of Factories and Local Body. In case of failure of pollution control equipment. the production process connected to it shall be stopped.

4 The applicant shall provide an alternate electric power source sufficient to operate all pollution control facil ities installed to maintain compliance with the terms and condit ions of the consent. In the absence, the applicant shall stop, reduce or otherwise, control product ion to abide by terms and conditions of this consent.

5 The nrm shall submit to th1s office, the 30th day of September every year, the Environmenta l Statement Report for the financial year ending 31st March in the prescribed Form-Vas per the provisions of ru le 14 of the Environment (Protection) (Second Amendment) Rules, 1992.

6 The industry should comply with the Hazardous & Other Wastes (M & TM) Rules, 2016 and submit the Annual Returns as per Rule 6(5) & 20(2) of Hazardous & Other Wastes (M & TM) Rules. 2016 for the preceding year April to March in Form-IV by 30th june of every year.

7 An inspection book shall be opened and made available to the Board 's officers during their visit to the applicant.

8 The industry shall constitute an Environmental cell with qualified staff/personnel/agency to see the day to day compliance of consent condition towards Environment Protection .

9 The applicant shall install a separate meter showing the consumption of energy for operation of domestic and industrial effluent treatment plants and air pollution control system . A register showing consumption of chemicals used for treatment shall be maintained.

10 The applican t shall bring minimum 33% of the available open land under green coverage/ plantation . The appl icant shall submit a yearly statement by 30th September every year on ava ilable open plot area, number of trees surviving as on 31st March of the year and number of trees planted by September end.

ll The mdustry shall submit offici al e-mail address and any change will be duly informed to the MPCB.

12 Industry should monitor effluent quality, stack emissions and a bie air quality monthly/quarterly.

Page 9 of 11

245

158

13 The industry shall recycle/reprocess/ reuse/recover Hazardous Waste as per the provision contain in the H&OW(M&TM ) Rules 2016, which can be recycled/processed/ reused/ recovered and only waste wh ich has to be incinerated shall go to incineration and waste which can be used for land fill ing and cannot be recycled/ reprocessed etc. should go for that purpose, in order to reduce load on incineration and landfill site/environment.

14 Industry shall strictly comply wi th the Water (P&CP) Act, 1974, Air (P&CP) Act,1981 and EnVIfonmental Protect1on Act.1986 and industry specific standard under EP Rules 1986 which are available on MPCB website(www.mpcb.gov.in).

15 Separate dra inage system shall be provided for collection of trade and sewage effluents. Termina l manholes shall be provided at the end of the collection system with arrangement for measuring the tlow. No effluent sha ll be admitted in the pipes/sewers downstream of the term1nal manholes. No effluent shall find its way other than in designed and provided collcc 10n s;c; tem

16 Neither storm water nor d1scharge from other premises sha ll be allowed to mix with the effluents from the fac tory.

17. Conditions for D.G. Set a) Noise from the D.G. Set should be controlled by providing an acoustic enclosure or by

treating the room acoustically.

b) Industry should provide acoustic enclosure for control of noise. The acoustic enclosure/ acoustic treatment of the room should be designed for minimum 25 dB (A) insertion loss or for meeting the ambient noise standards. whichever is on higher side. A suitable exhaust muffler with insertion loss of 25 dB (A) shall also be provided. The measurement of insertion loss wi ll be done at different points at 0.5 meters from acoustic enclosure/room and then average.

c) Industry should make efforts to bring down noise level due to DG set, outside industrial premises, with in ambient noise requirements by proper sitting and control measures.

d) Ins ta lla t ion of DG Set must be strictly in compliance with recommendations of DG Set manufacturer.

e) A proper rou tme and preventive maintenance procedure for DG set should be set and followed in consul tation with the DG manufacturer which wou ld help to prevent noise levels of DG set from deteriorating with use.

f) D.G. Set shall be operated only in case of power failure.

g) The applicant should not cause any nuisance in the surrounding area due to operation of D.G. Set.

h) The applicant shall comply with the notification of MoEFCC, India on Environment (Protection) second Amendment Rules vide GSR 371(E) dated 17.05.2002 and its amendments regard ing noise limit for generator sets run with diesel.

18 The industry should not cause any nuisance in surrounding area.

19 The industry shall take adequate measures for control of noise levels from its own sources within the premises so as to maintain ambient air quality standard in respect of noise to less th an 75 dB (A) during day time and 70 dB (A) during night time. Day time is reckoned in between 6 a.m. and 10 p.m. and night time is reckoned between 10 p.m. and 6 a.m.

20 The applica nt shall ma intain good housekeeping.

21 The non-hazardous sol1d waste arising in the fa ctory premises, sweepings, etc. be disposed of scienti fica lly so as not to cause any nuisance I pollution. The applicant shall take necessary permissions from civic authorit ies for disposal of solid waste.

22 The appl icant shall not change or al ter the quantity, qua lity, the rate of discharge, temperature or the mode of the effluent/emissions or hazardous wastes or control

qu1pment provided for without previous written perm ission of the Board. The industry will not carry ou t any act1v1ty. for which this consent has not been granted/without prior consent of the Board.

Page 10 of 11

30

246

159

• 23 The industry shall ensure that fugitive emissions from the activity are controlled so as to maintain clean and safe environment in and around the fa ctory premises.

24 The industry shall achieve the National Ambient ir Quality standards prescribed vide Government of India, Notification dtd. 16.11.2009 s amended.

Page 11 of 11

3J

247

160Maharashtra Pollution Control Board

~pplication for Consent/ Authorisation

iir, /We hereby apply for"'

L. Consent to Establish/Operate/Renewal of consent under section 25 and 26 of the Water (Prevention & Control of Pollution) Act. 1974 as amended.

!. Consent to Establish/Operate/Renewal of consent under Section 21 of the Air (Prevention and Control of Pollution) Act. 1981, as amended.

I. Authorization/renewal of authorization under Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016. in connection with ny/our/existing/proposed/altered/ additional manufacturing/processing activity from the premises as per the details given below.

Consent Information

UAN No: Application Date: Payment Received on: Industry Name:

MPCB-CONSENT-0000073543 May 21, 2019 Oct 3, 2019

Industry Information

Consent To:

Operate

Type of institution:

Industry

EC Reqd.

No

/IN No.:

Industry Type:

R12 Sugar ( excluding Khandsari)

EC Obtained

No

Submit to:

SRO - Pune I

Category:

Red

EC Ref. No.

Shri Chhatrapati Sahakari Sakhar Karkhana Ltd Bhavaninagar Tal-lndapur Dist-Pune

Gross Capital in lakhs

20500.00

Scale:

L.S.I

Whether construction-buildup area is more than 20,000 No sq.mtr.(Existing Expansion Unit)

General Information

1. Name, designation, office address with Telephone/Fax numbers. e-mail of the Applicant Occupier/Industry/Institution I Local Body.

Name GOVIND MAHADEV ANARSE

Designation

MANAGING DIRECTOR

Area

BHAVANINAGAR

Telephone

9075658383

Email

scssklb.envt30@gmai l.com

Address

atpost-bhavaninagar taluka-indapur dist-pune

Taluka INDAPUR

District

Pune

Fax

02118266253

Pan Number

AAAAS3869G

------------------------------------------2. (a) Name and location of the industrial unit/premises for which the ilpplicatton is made (Gtve revenue Survey Number/Plot number name of Ta luka and District. also telephone and fax number)

248

161

MAHARASHTRA POLLUTION CONTROL BOARD Tel:24010437/24020781/24014701 Fax: 24024068 /24023515 Website: http:/ /mpcb.gov.in E-mail: [email protected] .in

-............. Kalpataru Point, zno~- 41hFloor1

Opp. Cine Planet Cinema, Near Sion Circle, Sion (E)

Mumbai • 400 022

Red/LSI Date: I q 10912018 Cottsent No: Format 1.0/BO/CA.C-CELLIUAN No. 0000030950/R/CAC- f 809002L:J I <-t

To, M/ s. Shri Chhatrapati Saha.kari Sa.khar Karkhana Ltd., ~ At Post- Bhavaninagar, tal.- lndapur, ~' Disti Pone. ~

Subject : Renewal of Operate of 3500 TCD Sugar under RED categ a. s;:) Ref I. Minutes of CAC meeting held on 31.10.2017. ~ Your application: 0000030950. ~ Dated: 27.07.2017. ~""' For: Renewal of Consent to Operate of 3500 TCD S gar unit with increase in CI, under RED category, under Section 26 of the Water (Preven ion Control of Poilu tion) Act, 1974 & under Section 21 of the Air (Prevention & ontrol of Pollution) Act, 1981 and Authorization under Rule 5 of the Hazard u Wastes (M, H & T M) Rules 2008 is considered and the consent is hereby g an ea subject to the following terms and conditions and as detailed in the sche ule II, III & IV annexed to this order:

1.

2.

3.

4.

1.

2.

under W ater (P&CP), 1974 Act for discharge of effluent:

Trade effluent Domestic effluent

250

20

As per Schedule -1 Asper Schedule - 1

On land for inigation

M/s. Shri ChhatropCitl SSK Ltd., SRO Pune·I/1/R/1.,/0000030950 Pooe 1of7

33

249

162

5.

6. Conditions under Hazardous Waste (M, H & T M) Rules, 2008 for treatment and disposal of hazardous waste:

Sr. No. ' Type of Waste Category Quantity UOM Disposal

1

2

1

Used / Spent Oil

Chemical Sludge, oil & grease skimming residue

Fly / Boiler Ash 15

5.1 300.0

34.4 5.0

6. This Board reserves the right to review, amend, sf end

Kg/ M

MT/ M

same shall be binding on the industry. .f'....

7. This consent should not be construe<l (a~demption from obtaining necessary NOC/ permission from any other Government'a~e cies.

8. Industry shall operate online monitori~&l'}tem which is installed as per the directions of CPCB/MPCB & shall connect an t,tp oaa the data to CPCB/MPCB server.

9. This Consent is issued without prejudice to the directions issued and being issued by CPCB in respect of onlin o t ring system.

10. Industry shall provideS ensate polishing unit (CPU) within 3 months period

~"f). Forandonbehalfofthe

~ Copy to: 1. Regional Officer - MPCB Pune. 2. Sub -Regional Officer- Pune-I, MPCB, He is directed to ensure the compliance of the

consent conditions. 3. Chief Accounts Officer, MPCB, Mumbai. 4. CC/ CAC desk- for record & website updation purposes.

M/s. Shrl Chhatrapati SSK Ltd., SRO Punt·lfi/R/L/0000030950 Page2of7

250

163

1)

Schedule-I I) Terms & Conditions for compliance of Water Pollution Control

A] As per your application, you have provided Effluent Treatment Plant (ETP) with design capacity 300 CMD.

B] The Applicant shall operate the effiuent treatment plant (ETP) to treat the trade effluent so as to achieve the following standards prescribed by the Board or under EP Act, 1986 and Rules made there under from time to time, whichever is s tnngent.

Sr. Parameters Standards prescribed by Board No.

Limiting Concentration in mg/1, ~ept for pH

01 pH 5.5-9.0 d''-.~ 02 Oil & Grease 10 ~" 03 BOD (3 days 27oC) 10~\~" 04 Sulphate 1'000"\._) 05 Suspended Solids ~tto~ 06 COD \('\..~d

07 Chloride --~'-6oo 08 Total Dissolved Solids r \. ' ' 2100

".J-C) The treated effiuent 250 CMD of sugar unit shall be disposed on land for irrigation

on 25 acres of own land I as per the bilateral agreement with farmers. In no any case treated I untreated effiuent shall find it's way outside the factory premises directly or indirectly.

D] CREP conditions for Sugar Factory i. Operation of ET sb' ll"' e started at least one month before starting of cane

crushing to achiev desrred MLSS. So as to meet prescribed standards from day one the OJ?ltltion of mill.

ii. Waste wat~ge~e(ation shall. be redu~ed t? 100 liters per tone of ~e crushed. m. Indus~n~adtieve zero discharge mto m land surface water bodtes. iv. 15 davt:s_~age capacity tank shall be provided for treated effluent to take care

of nJ qewand for irrigation. F] Indu~~"'sJ.llft maintained arrangement provided for covering of effluent collection

syst~cwd ro avoid the ingress of Bagasse other material. G] ~ ltb~t shall operate ETP even after completion of the crushing season so ~~tiany effiuent generated during washing & maintenance is discharged

er proper treatment. be unit shall optimize water use in industrial process & maintain records of

water consumption & waste water generation.

2) A] As per your consent application, for the sewage generation you have provided septic tank & soak pit.

B] The Applicant shall operate the sewage treatment system to treat the sewage so as to achieve the following standards. (1) Suspended Solids Not to exceed 100 mg/1. (2) BOD 3 days 27°C Not to exceed 100 mg/1.

C] The treated sewage 20 CMD shall be dispo on land for gardening/ irrigation.

Mjs. Shrl Chhatrapod SSK Ltd., SRO Pune-1/1/R/L/0000030950 Page3of7

251

164

3) The industry shall have bilateral agreement with the farmers on whose land the treated effluent is used for irrigation purposes and a copy of the agreements with validity shall be submitted to the Regional/Sub- Regional Office of the Board.

4) The industry shall create Environmental Cell by appointing an Environmental Engineer, Chemist and Agriculture expert for looking after day to day activities related to Environment and irrigation field where treated effluent is used for irrigation.

5) CONDITIONS FOR MOLASSES STORAGE:

6)

ll)

(i)

(ii)

(iii)

(iv)

(v)

(vi)

The molasses shall be properly collected and stored in steel tanks which shall be leak proof. At no stage of handling of molasses, there shall be leakage or spillage. The capacity of tanks for storage of molasses shall be such that it 1:· take care of bumper production of sugar, non-lifting of molasses etc. All the area on which molasses are stored and handled should b pr · ded with drain for diverting the spills to the treatment plant! molasse rifk. Suitable arrangements for accidental discharges of molasses from tanks shall be provided to contain the same within factory premises. Destruction of molasses and its disposal shall not e one without specific permission in writing from the authorized office~() e Board. Intimation of intention to destroy or dispose of the molasses shattbe.,gtven to the Board atleast 15 (fifteen) days in advance by registered post under n tiination to the Sub-Regional officer and Regional officer of the Board u de wHose jurisdiction the factory is situated. The storage tanks shall be kept in good conditions all the year round with adequate maintenance. The tanks size anc:L capacity per em, height, total capacity in tonnes shall be displayed prominently ne~ ruilie tank. The above conditions shall q_e i£1, ~on to and not in derogation of the provisions contained in the "Bomba ~14Qlasses Rules, 1955" and "Maharashtra Molasses Storage and Supply Regul tion, 1965".

The Applicant shall provi~Specj.fic Water Pollution control system as per the conditions ofEP Act, 1986 and ' there under from time to time/ Environmental Clearance I CREP guidelines · amollc:clbJle.

ter gets polluted & pollutants are

4. Processing whereby water gets polluted & pollutants are not and are toxic

Mj s. Shrl Chhatropatl SSK Ltd. SRO Pun~·I/1/R/L/0000030950 Pag~4of7

252

165

Schedule-IT

Terms & conditions for compliance of Air Pollution Control

I . As per your application, you have provided the Air pollution control (APC) system and also erected following stack (s) to observe the following fuel pattern-

75.0 Bagasse

2. The Applicant shall provide ESP I Bag filter I Wet scrubber to the tlal~ass:e..ttreatlm Dust Collector to Sugar bagging section as an Air Pollution control eqtJiprqeptS the conditions of EP Act, 1986 and rule made there unde Environmental Clearance I CREP guidelines.

3. The applicant shall operate and maintain above mentioned a· po as to achieve the level of pollutants to the following standl cis·

4.

5.

Sr. No.

1

2

I Particulate matter

The Applicant shall obtain necessary prior qpisston for providing additional control equipment with necessary specification 1d' operation thereof or alteration or replacement/ alteration well before its r e cow.e to an end or erection of new pollution control equipment.

The Board reserves its rights arY, 11 or any of the condition in the consent, if due to any technological improveme oN>therwise such variation (including the change of any

ole or in part is necessary).

Schedule-Ill Details of Bank Guarantees

Submission Purpose of BG Compliance Validity Imposed Period Period Date

0 & M for achieving consented

Cto R Rs. 5 Lacs 15 days standards of

31.07.2019 31.12.2019 Effluent & Stack emission,

Towards provision of condensate

15 days polishing unit

CtoR Rs. 5 Lacs (CPU) within 3 31.12.2018 31.12.2019 months

M/~ Shrf Chhatrapatl SSK Ltd, SRO Pune·I/ 1/R/L/0000030950 Page Sof 7

253

166

Schedule-IV General Conditions

1) The applicant shall provide facility for collection of environmental samples and samples of trade and sewage effluents, air emissions and hazardous waste to the Board staff at the terminal or designated points and shall pay to the Board for the services rendered in this behalf.

2) Industry should monitor effluent quality, stack emissions and ambient air quality monthly. 3) The applicant shall provide ports in the cbimney/ (s) and facilities such as ladder, platform etc.

for monitoring the air emissions and the same shall be open for inspection to/ and for use of the Board's Staff. The cbimney(s) vents attached to various sources of emission shall be designated by numbers such as S-1, S-2, etc. and these shall be painted/ displayed to facilitate identification.

4) Whenever due to any accident or other unforeseen act or even, such emissions occur or is apprehended to occur in excess of standards laid down, such information shall be forthwith Reported to Board, concerned Police Station, office of Directorate of Heal~ Services, Department of Explosives, Inspectorate of Factories and Local Body. In ~ 5ffailure of pollution control equipments, the production process connected to it shall be s o:aped.

5) The applicant shall provide an alternate electric power source sufficien to OP.erate all pollution control facilities installed to maintain compliance with the terms anti con itions of the consent In the absence, the applicant shall stop, reduce or otherwise, co tro production to abide by terms and conditions of this consent. ~

6) The firm shall submit to this office, the 30th day of September every year, the Environmental Statement Report for the fmancial year ending 31 51 Ma cb in the prescnbed Form-Vas per the provisions of rule 14 of the Environment (Protection) (S cond.Amendment) Rules, 1992.

7) The industry shall recycle/ reprocess/ reuse/ recove Hazardous Waste as per the provision contain in the HW (MH&TM) Rules 2008, me can be recycled /processed / reused / recovered and only waste which has to be incmerate shall go to incineration and waste which can be used for land filling and cannot be recytl d/ reprocessed etc should go for that purpose, in order to reduce load on incineration and la ~fill Site/ environment.

8) The industry should comply with the Haza dous Waste (M, H & TM) Rules, 2008 and submit the Annual Returns as per Rule 5(6 & 22 2) of Hazardous Waste (M, H & TM) Rules, 2008 for the preceding year April to MarclUn Form-IV by 30th June of every year.

9) An inspection book shall be OJ>.ened and made available to the Board's officers during their visit to the applicant. ~

10) The applicant shall make an a~plication for renewal of the consent at least 60 days before the date of the expiry of the consent (in case of Renewal of consent).

11) Industry shall stricti~ c mply with the Water (P&CP) Act, 1974, Air (P&CP) Act, 1981 and Environmental Prot G,don Act, 1986 and industry specific standard under EP Rules 1986 which are available on CB website (www.mpcb.gov.in).

12) The industzy srrll constitute an Environmental cell with qualified staff/ personnel/agency to see the day ompliance of consent condition towards Environment Protection.

13) Separate dr~age system shall be provided for collection of trade and sewage effluents. Terminal manholes shall be provided at the end of the collection system with arrangement for measuring the flow. No effluent shall be admitted in the pipes/ sewers downstream of the terminal manholes. No effiuent shall find its way other than in designed and provided collection system.

14) Neither storm water nor discharge from other premises shall be allowed to mix with the effluents from the factory.

15) The applicant shall install a separate meter showing the consumption of energy for operation of domestic and industrial effluent treatment plants and air pollution control system. A register showing consumption of chemicals used for treatment shall be maintained.

16) Conditions for D.G. Set a) Noise from the D.G. Set should be controlled by providin acoustic enclosure or by treating

the room acoustically.

Mj s. Shrl Chhatropatl SSK Led., SRO Pune·I/ 1/ R/ L/ 0000030950 Page 6of7

254

167

b) Industry should provide acoustic enclosure for control of noise. The acoustic enclosure/ acoustic treatment of the room should be designed for minimum 25 dB (A) insertion loss or for meeting the ambient noise standards, whichever is on higher side. A suitable exhaust muffler with insertion loss of 25 dB (A) shall also be provided. The measurement of insertion loss will be done at different points at 0.5 meters from acoustic enclosure/ room and then average.

c) Industry should make efforts to bring down noise level due to DG set, outside industrial premises, within ambient noise requirements by proper sitting and control measures.

d) Installation of DG Set must be strictly in compliance with recommendations of DG Set manufacturer.

e) A proper routine and preventive maintenance procedure for DG set should be set and followed in consultation with the DG manufacturer which would help to prevent noise levels of DG set from deteriorating with use.

t) D.G. Set shall be operated only in case of power failure. g) The applicant should not cause any nuisance in the surrounding area due to o~reyn of D.G ..

h) The applicant shall comply with the notification of MoEF dated 17.05. 0 e arding noise Set. ~ limit for generator sets run with diesel. ~

17) The industry should not cause any nuisance in surrounding area. ., V 18) The industry shall take adequate measures for control of noise ve from its own sources

within the premises so as to maintain ambient air quality standard~ espect of noise to less than 75 dB (A) during day time and 70 dB (A) during night time. P~ e is reckoned in between 6 a.m. and 10 p.m. and night time is reckoned between 10 p. . d 6 a.m.

19) The applicant shall maintain good housekeeping. 20) The applicant shall bring minimum 33% of the a~a ~ open land under green coverage/

plantation. The applicant shall submit a yearly fate~ent by 30th September every year on available open plot area, number of trees surw~g a n 31" March of the year and number of trees planted by September end. ~ ~

21) The non-hazardous solid waste arising ~· actory premises, sweepings, etc. be disposed of scientifically so as not to cause any n~n~ '/ pollution. The applicant shall take necessary permissions from civic authorities for ~QO a of solid waste.

22) The applicant shall not change or alter the quantity, quality, the rate of discharge, temperature or the mode of the effluent/ emi~ion or hazardous wastes or control equipments provided for without previous written pe • IS ·on of the Board. The industry will not carry out any activity, for which this consent bas no lleen granted/ without prior consent of the Board.

23) The industry shall e~ur that fugitive emissions from the activity are controlled so as to maintain clean and safe yironment in and around the factory premises.

24) The industry shall suo 't quarterly statement in respect of industries obligation towards consent and pollution ont!o compliance's duly supported with documentary evidences (format can downloade fiWl.l·MPCB official site).

25) The ind s liall submit official e-mail address and any change will be duly informed to the MPCB.

26) The industry shall achieve the National Ambient Air Quality standards prescribed vide Government of India, Notification dt. 16.11.2009 as amended.

27) The Board reserves its rights to review plans, specifications or other data relating to plant setup for the treatment of waterworks for the purification thereof & the system for the disposal of sewage or trade effluent or in connection with the grant of any consent conditions. The Applicant shall obtain prior consent of the Board to take steps to establish the unit or establish any treatment and disposal system or an extension or addition thereto.

28) The industry shall ensure replacement of pollution control system or its parts after expiry of its expected life as defmed by manufacturer so as to ensure the compliance of standards and safety of the operation thereof.

~---0000-----

Mjs. Shrl Chhatrapotf SSK Ltd, SRO Pune·l/1/ R/L/0000030950 Pagt7of7

255

168

MAHARASHTRA POLLUTION CONTROL BOARD Td: 24010437/24020781/24014701 Fax:24024068/24023515 Website: http:/ /mpcb.gov.in E-mail: [email protected] .in

--- Kalpataru Point, 2"". 4 .... Floor,

Opp. Cine Planet Cinema, Near Sio.n Circle, Sion (E) Mumbai • 400 022

Red/LSI Date: I '{loCf/2018 ConsentNo: }ormat 1.0/BO/CAC-CELLIUA.NNo. 0000030987/R/CAC-! gOCJ00.2.0I3

To, M/s. Shri Chhatrapati Sahalcari Sakhar Karkha.na Ltd., At Post- Bhavaninagar, tal. - lndapur, Disti Pune.

Subject : 1" Operate of 3000 TCD Sugar & 18 MW Co-generation u under RED category.

Ref I. Minutes of CAC meeting held on 31.10.2017. ~ <:::) Your application: 0000030987. Dated: 27.07.2017. For: 1st Consent to Operate of 3000 TCD Sugar & Co-generation unit, under RED category, under Section 26 of the Water (Preven i n & Control of Pollution) Act, 1974 & under Section 21 of the Air (Preventio~ & Control of Pollution) Act, 1981 and Authorization under Rule 5 of the HazarCious Wastes (M, H & T M) Rules 2008 is considered and the consent is her b granted subject to t he following terms and conditions and as detailed in the scheau l, II, III & IV annexed to this order:

1. The consent is granted from a ~eriod:up to 31.07.2019.

2. The actual capital investmen; 'Qf e industry is Rs . 149.85 Cr. (As per C. A. Certifica s mitted by industry)

3. The Consent is vali

4.

1.

2.

Sr. No. Product I By-Product Name Maximum Quantity in MT /M 10695 26970 3720 3720

Co- eneration 18 MW (The cane crushing Capacity of Sugar Industry shall not exceed 3000 TCD)

Trade effluent

Domestic effluent

04

Asper Schedule -I

I 0 CMD shall be I 00% & remaining 250 CMD on land for On land for irrigation

M/t. Shrl ChhoUTJpotl SSK Ltd. SRO Pun~I/1/R/L/0000030987 Page1of7

256

169

5.

6. Conditions under Hazardous Waste (M, H & T M) Rules, 2008 for treatment and disposal ofhazardous waste:

Sr. No. , Type of Waste Category Quantity UOM Disposal

1

2

Used / Spent Oil

Chemical Sludge, oil & grease skimming residue

Fly/ Boiler Ash 15

5.1 300.0

34.4 5.0

6. This Board reserves the right to review, amend, suspen same shall be binding on the industry.

Kg/ M

MT/ M

7. This consent should not be construed a ~emption from obtaining necessary NOC/ permission from any other Government agencies.

8. Industry shall operate online monitoQI1g~ste which is installed as per the directions of CPCB/MPCB & shall connect and uplo d_the data to CPCB/MPCB server.

9. This Consent is iss11ed withon prejudice to the directions issued and being issued by CPCB in respect of online monitoring system.

For and on behalf of the

Copy to: 1. Regional Officer - MPCB Pune. 2. Sub -Regional Officer - Pune-1, MPCB, He is directed to ensure the compliance of the

consent conditions.

3. Chief Accounts Officer, MPCB, Mumbai.

4. CC/ CAC desk- for record & website updation purposes.

M/s. Shrl Chhatrapod SSK Ltd., SRO Punt·lf//R/ L/0000030987 Pagt2of 7

~\

257

170

1)

Schedule-I I) Terms & Conditions for compliance of Water Pollution Control

2)

A] As per your application, you have provided Effluent Treatment Plant (ETP) with design capacity 1000 CMD.

B) The Applicant shall operate the effiuent treatment plant (ETP) to treat the trade effluent so as to achieve the following standards prescribed by the Board or under EP Act, 1986 and Rules made there under from time to time, whichever is

C)

D) E)

F]

G

H)

A]

B)

s trmgent. Sr. Parameters Standards prescribed by Board No.

Limiting Concentration in mg/1, eX,cept for pH

01 pH 5.5-9.0 ...t'-~ 02 Oil & Grease 10 ~' 03 BOD (3 days 27oC) lOQ' \'\~' 04 Sulphate toad' 1 OS Suspended Solids ( 100, 06 COD ~,250 07 Chloride ~~6oo 08 Total Dissolved Solids

r ·" '' 2100

'\..J The treated effiuent 210 CMD of sugar unit shall be disposed on land for irrigation on 25 acres of own land / as per the bilateral agreement with farmers. In no any case treated I untreated effluent shall find it's way outside the factory premises directly or indirectly. The treated effluent 04 CMD of Co-gen unit shall be 100% recycle in process. CREP conditions for Sugar Factory

1. Operation of ETP s all e started at least one month before starting of cane crushing to acffie e desired MLSS. So as to meet prescribed standards from day one the o ation of mill.

ii. Waste wate generation shall be reduced to 100 liters per tone of cane crushed. iii. Indu l!Y..Sfiall achieve zero discharge into in land surface water bodies. iv. 15 days st6rage capacity tank shall be provided for treated effluent to take care

Qf o demand for irrigation. i'n us ~shall maintained arrangement provided for covering of effluent collection sY,s eq1 and to avoid the ingress ofBagasse other material. h unit shall operate ETP even after completion of the crushing season so 1t any effluent generated during washing & maintenance is discharged

after proper treatment. The unit shall optimize water use in industrial process & maintain records of water consumption & waste water generation.

As per your consent application, for the sewage generation you have provided septic tank & soak pit. The Applicant shall operate the sewage treatment system to treat the sewage so as to achieve the following standards. (1) Suspended Solids Not to exceed (2) BOD 3 days 27°C Not to exceed

100 100

mg/1. mg/1.

C) The treated sewage 18 CMD shall be dis sed on land for gardening/ irrigation.

Mjs. Shrt Cirhotropoli SSK Ltd., SRO Pune·I/1/R/L/0000030987 Poge3of7

258

171

3) The industry shall have bilateral agreement with the farmers on whose land the treated effiuent is used for irrigation purposes and a copy of the agreements with validity shall be submitted to the Regional/ Sub- Regional Office of the Board.

4) The industry shall create Environmental Cell by appointing an Environmental Engineer, Chemist and Agriculture expert for looking after day to day activities related to Environment and irrigation field where treated effluent is used for irrigation.

5) CONDITIONS FOR MOLASSES STORAGE:

6)

m

(i)

(ii)

(iii)

(iv)

(v)

(vi)

The molasses shall be properly collected and stored in steel tanks which shall be leak proof. At no stage of handling of molasses, there shall be leaka&_e or spillage. The capacity of tanks for storage of molasses shall be such that it take care of bumper production of sugar, non-lifting of molasses etc. All the area on which molasses are stored and handled shoulcrb rovided with drain for diverting the spills to the treatment plant/ _fll.O ~ ank. Suitable arrangements for accidental discharges of molasse fror ~th~ tanks shall be provided to contain the same within factory premises. Destruction of molasses and its disposal shall no be one without specific permission in writing from the authorized officer qf ilie Board. Intimation of intention to destroy or dispose of the molasses s4f'U regiven to the Board atleast 15 (fifteen) days in advance by registered post unae~timation to the Sub-Regional officer and Regional officer of the Boar un"itertwhose jurisdiction the factory is situated. The storage tanks shall be kept in good nditions all the year round with adequate maintenance. The tanks size and cap city per em, height, total capacity in tonnes shall be displayed pro mine y n ai\Can the tank. The above conditions shalfb · aCJdition to and not in derogation of the provisions contained in the "Bomba lasses Rules, 1955" and "Maharashtra Molasses Storage and Supply Regula ·on, 1965".

M/s. Shrl Chhatropad SSK Ltd., SRO Pune-1/ 1/ R/ L/0000030987 Pa~e4qf7

259

172

Scbedule-ll

Tenns & conditions for compliance of Air Pollution Control

1. As per your application, you have provided the Air pollution control (APC) system and also erected following stack (s) to observe the following fuel pattern-

Bagasse

2. Bagasse 350 MT / D • 75.0 Boiler (35 TPH) ESP

2. The Applicant shall provide ESP I Bag ftlrer/ Wet scrubber to the ~~1":1~-....... ~~~,..~ Dust Collector to Sugar bagging section as an Air Pollution the conditions of EP Act, 1986 and rule made there Environmental Clearance I CREP guidelines.

3. The applicant shall operate and maintain above mentione,s:i !i pollution control system, so as to achieve the level of pollutants to the following st Cis>

Particulate matter Not to exceed

4. The Applicant shall obtain necessary pJio ~ission for providing additional control equipment with necessary specifica · ons nd operation thereof or alteration or replacement/ alteration well before i orne to an end or erection of new pollution control equipment.

5. The Board reserves its rights all or any of the condition in the consent, if due to any technological improve~ent or otherwise such variation (including the change of any control equipment, othe · w ole or in part is necessary).

~"

Sr. No.

1 Cto R

~-:> Schedule-Ill ~ Details of Bank Guarantees

Submission Purpose of BG Imposed Period

0 & M for achieving consented

Rs. 5 Lacs 15 days standards of Effluent& Stack emission,

M/s. Shrl Chhotnlpati SSK Ltd. SRO Punt·f/f/R/L/0000030987

Compliance Validity Period Date

31.07.2019 31.12.2019

PogtSofl

260

173

1)

2) 3)

4)

5)

6)

7)

8)

9)

10)

Schedule-IV General Conditions

The applicant shall provide facility for collection of environmental samples and samples of trade and sewage effluents, air emissions and hazardous waste to the Board staff at the tenninal or designated points and shall pay to the Board for the services rendered in this behalf. Industry should monitor effluent quality, stack emissions and ambient air quality monthly. The applicant shall provide ports in the chimney/ (s) and facilities such as ladder, platform etc. for monitoring the air emissions and the same shall be open for inspection to/ and for use of the Board's Staff. The chimney(s) vents attached to various sources of emission shall be designated by numbers such as S-1, S-2, etc. and these shall be painted/ displayed to facilitate identification. Whenever due to any accident or other unforeseen act or even, such emissions occur or is apprehended to occur in excess of standards laid down, such information sha1 be forthwith Reported to Board, concerned Police Station, office of Directorate of lj1 f4. Services, Department of Explosives, Inspectorate of Factories and Local Body. In ~ of failure of pollution control equipments, the production process connected to it shall b. s o~ d. The applicant shall provide an alternate electric power source sufficie · ~ gcrate all pollution control facilities installed to maintain compliance with the terms an conQj,Iions of the consent. In the absence, the applicant shall stop, reduce or otherwise, c ntto production to abide by terms and conditions of this consent. The firm shall submit to this office, the 30th day of Septei'll!?e\. ev ry year, the Environmental Statement Report for the financial year ending 3P' MarclJ(in~e> prescribed Form-Vas per the provisions of rule 14 of the Environment (Protection) (Second Amendment) Rules, 1992. The industry shall recycle/ reprocess/ reuse/ recover Hazardous Waste as per the provision contain in the HW (MH&TM) Rules 2008, ~~ can be recycled / processed / reused / recovered and only waste which has to be ~ne 1eil shall go to incineration and waste which can be used for land filling and cannot be recyCied/ reprocessed etc should go for that purpose, in order to reduce load on incineration and s1te/ environment. The industry should comply with the I:fazaidOus Waste (M, H & TM) Rules, 2008 and submit the Annual Returns as per Rule 5(6) 21. 2) of Hazardous Waste (M, H & TM) Rules, 2008 for the preceding year April to Marc~ l rm-IV by 30ih June of every year. An inspection book shall be op, ~ezynd made available to the Board's officers during their visit to the applicant. ~ The applicant shall ma.k an aepUcation for renewal of the consent at least 60 days before the date of the expiry of the consent (in case of Renewal of consent).

11) Industry shall stricti}~ c mply with the Water (P&CP) Act, 1974, Air (P&CP) Act, 1981 and Environment<t,l Prot$ctiQn A~, 1986 and indus~ specific standard under EP Rules 1986 which are available on <SB webs1te (www.mpcb.gov.m).

12) The indus~ I constitute an Environmental cell with qualified staff/ personnel/agency to see the day to ~ mpliance of consent condition towards Environment Protection.

13) Separate r inage system shall be provided for collection of trade and sewage effluents. Terminal manholes shall be provided at the end of the collection system with arrangement for measuring the flow. No effluent shall be admitted in the pipes/ sewers downstream of the terminal manholes. No effluent shall fmd its way other than in designed and provided collection system. Neither storm water nor discharge from other premises shall be allowed to mix with the effluents from the factory.

14)

15)

16) a)

The applicant shall install a separate meter showing the consumption of energy for operation of domestic and industrial effluent treatment plants and air pollution control system. A register showing consumption of chemicals used for treatment shall be maintained. Conditions for D . G. Set Noise from the D.G. Set should be controlled by provi · g an acoustic enclosure or by treating the room acoustically.

M/s. Shrl Chhatrapati SSK Ltd., SRO Pune-l/1/R/L/0000030987 Page 6of7

261

174

b) Industry should provide acoustic enclosure for control of noise. The acoustic enclosure/ acoustic treatment of the room should be designed for minimum 25 dB (A) insertion loss or for meeting the ambient noise standards, whichever is on higher side. A suitable exhaust muffler with insertion loss of 25 dB (A) shall also be provided. The measurement of insertion loss will be done at different points at 0.5 meters from acoustic enclosure/ room and then average.

c) Industry should make efforts to bring down noise level due to DG set, outside industrial premises, within ambient noise requirements by proper sitting and control measures.

d) Installation of DG Set must be strictly in compliance with recommendations of DG Set manufacturer.

e) A proper routine and preventive maintenance procedure for DG set should be set and followed in consultation with the DG manufacturer which would help to prevent noise levels of DG set from deteriorating with use.

f) D.G. Set shall be operated only in case of power failure. g) The applicant should not cause any nuisance in the surrounding area due to o

Set. h) The applicant shall comply with the notification of MoEF dated 17.05. 0

limit for generator sets run with diesel. ~ 17) The industry should not cause any nuisance in surrounding area. • "'-J 18) The industry shall take adequate measures for control of noise 1 v s from its own sources

within the premises so as to maintain ambient air quality standard' n pect of noise to less than 75 dB (A) during day time and 70 dB (A) during night time. Day...t:!fne is reckoned in between 6 a.m. and 10 p.m. and night time is reckoned between 10 . . no 6 a.m.

19) The applicant shall maintain good housekeeping. 20) The applicant shall bring minimum 33% of the a ailabl open land under green coverage/

plantation. The applicant shall submit a yearly ta e!llent by 30th September every year on available open plot area, number of trees su iv· on 3 P' March of the year and number of trees planted by September end.

21) The non-hazardous solid waste arising~~ e (~ ory premises, sweepings, etc. be disposed of scientifically so as not to cause any nuisanc~ 'I pollution. The applicant shall take necessary permissions from civic authorities ti r diS osal of solid waste.

22) The applicant shall not change or alte ~e quantity, quality, the rate of discharge, temperature or the mode of the effiuent/emis io or hazardous wastes or control equipments provided for without previous written ermiss ·on of the Board. The industry will not carry out any activity, for which this consent has not een granted/without prior consent of the Board.

23) The industry shall en lr".e ~ fugitive emissions from the activity are controlled so as to maintain clean and s e yironment in and around the factory premises.

24) The industry shall:suomit quarterly statement in respect of industries obligation towards consent and pollution con a compliance's duly supported with documentary evidences (format can download fr~ MPCB official site).

25) The in ~ sfia'l submit official e-mail address and any change will be duly informed to the MPCB.

26) The industry shall achieve the National Ambient Air Quality standards prescribed vide Government of India, Notification dt. 16.11.2009 as amended.

27) The Board reserves its rights to review plans, specifications or other data relating to plant setup for the treatment of waterworks for the purification thereof & the system for the disposal of sewage or trade effluent or in connection with the grant of any consent conditions. The Applicant shall obtain prior consent of the Board to take steps to establish the unit or establish any treatment and disposal system or an extension or addition thereto.

28) The industry shall ensure replacement of pollution control system or its parts after expiry of its expected life as defined by manufacturer so as to ensure the compliance of standards and safety of the operation thereof.

-----0000-----

Mfs. Shri Chhacropotl SSK Led., SRO Punt· I/1/R/L/0000030987 Po~t7of7

262

175

Application for Consent/ Authorisation

Sir, 1/We hereby apply for*

1. Consent to Establish/Operate/Renewal of consent under section 25 and 26 of the Water (Prevention & Control of Pollution) Act, 1974 as amended.

2. Consent to Establish/Operate/Renewal of consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981, as amended.

3. Authorization/renewal of authorization under Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, In connection with my/our/existing/proposed/altered/ additional manufacturing/processing activity from the premises as per the details given below.

Consent Information

UAN No: Application Date: Payment Received on: Industry Name:

MPCB-CONSENT-0000030987 Jul 27, 2017 Jul 31, 2017

Industry Information

Consent To: Operate

Type of institution:

Industry

EC Reqd. No

/IN No.:

Industry Type:

R12 Sugar ( excluding Khandsari}

EC Obtained Yes

Submit to: SRO- Pune I

Category:

Red

SHRI CHHATRAPATI SAHAKARI SAKHAR KARKHANA LTD,BHAVANINAGAR

Gross Capital in lakhs 14985.00

Scale:

L.S.I

EC Ref. No. SEAC-2016/CR-220/TC-2

Whether construction-buildup area is more than 20,000 No sq.mtr.(Existing Expansion Unit)

General Information

1. Name, designation, office address with Telephone/Fax numbers, e-mail of the Applicant Occupier/Industry/Institution I Local Body.

Name GOVIND MAHADEV ANARSE

Designation

MANAGING DIRECTOR

Area BHAVANINAGAR

Telephone 9075658383

Email [email protected]

Address atpost-bhavaninagar taluka-indapur dist-pune

Taluka

INDAPUR

District

Pune

Fax 02118266253

Pan Number AAAAS3869G

2. (a} Name and location of the industrial unit/premises for which the application is made (Give revenue Survey Number/Plot number name of Taluka and District, also telephone and fax number)

263

176. . : •

\

To,

f1 'Tln ~UM- - .l..!-

A}l}J t-~o~-JI STATE LEVEL ENVffioNMENT IMP ACT ASSESSMENT AUTHORITY

SEAC-20 16/CR-220ffC-2 Environment department, Room No. 217, 2nd floor, Mantralaya Annexe, Mumbai- 400 032. Date: ~ D-e< ember, 2016.

Mls. Sliri Chhatrapati Co-operative Sugar factory Ltd.

At Bhavaninagar Tal Indapur Pune

• . tl"r ECSE:IAA .-:r.tero t-J0-32.. Mee+'~ NO -:1.0.5

Subject: Environment clearance for Expandon & Modernization of Sugar Unit of capacity 3500 TCD to 6500 TGD along with Co-gen 18 MW at Bhavaninagar Tal Indapur Pune by M/s. Shri Chhatrapati Co-operative Sugar Factory Ltd.

Sir,

This hns reference to your communication on the above mentioned subject. The proposal was considered as per the EIA Notification, 2006, by the State Level Expert Appraisal Committee-!, Maharashtra in its 130111 meeting and decided to recommend the project for prior environmental cleanmce to SEIAA. Infonnation submitted by you has been considered by State Level E!ivironment Impact Assessment Authority in its 1 05th meeting.

2. It is noted that the proposal is considered by SEAC-I under screening category 50) & 1{d) B 1 as per EIA Notification 2006. ·

B"flti f ne norma ton o fth . t b "tdb P . tP e pro ec su mit e >Y rojec rooonen IS as: 1 Name of the Project "Shri Chhatrapati Sahakari Sakhar Karkhana Ltd."

2 Name, address, e-mail Name:Mr. G. M. Anarase (MD) & Address: Gat. No. 48, 50, Bhawaninagar, Tal: Indapur Dist: contact number of Pune Pin Code-413 104 ( Maharashtra) Proponent Mobile number: 021-18266232

Email ID: [email protected] 3 Name of Consultant Name: S G M Corporate Consultants Pvt. Ltd.

4 Accreditation of Yes. Sr. No.l46 as per list ofNABET Accredited EIA consultant consultant (NABET updated on June 2016 Accreditation)

5 New Project/ Expansion cum modernization project Expansion Existing capacity- 3500 TCD- Sugar factory in ex.it>ting project/ Proposed additional capacity- 3000 TCD- Sugar factory & 18 Modernization/ MW Co-gen(Bagasse based) Diversification in exiting project

6 If expansion/ NA Diversification, -

~-:-.

- 1-

. '()

264

177

whether environmental clearance -has 'been obtained for existi~g project (If yes, en~lose a copy with compliance table

7 Activity schedule in the Item No. 5 0) and 1 (d) as per the provision of Ministry of EIA Notification Environment & Forest (MoEF); New Delhi "EIA Notification

No S.O. 1533 (E)" dated 14.09.2006 amended on December ,01,2009.

8 Area Details Total Land available with factory- 52.5.6 ha. Land for Integrated sugar plant- 34.57 ha. Area . Existing (Sq. Expansion (Sq. Total (Sq. qetails Mt.) Mt.) Mt.) Total plot 3,46,289.5 -- 3,46,289.5 area Built up 81,055.65 29,422.96 1,10,478.61 area Green 57,182.08 -- 57182.08 built area

9 Name of the Notified NA Industrial area I MIDC area

10 TOR given by SEAC? Yes, In 95th SEAC I meeting held on 31.1.2015 (If yes then specify the meeting? . ·.

11 Estimated capital cost Rs 19200 Lacs. of the Project (Existing-4215 + Proposed-14985) (including cost for land, building, plant and machinery separately)

12 Location details of Location: Factory is located at Gat. No. 48,50, Bhawaninagar, the project : Tal: Indapur Dist: Pune Pin Code-413 104 ( Maharashtra)

Elevation above Mean Sea Level -1822 ft 13 bistance from NA

Protected Areas I Critically Polluted areas I Eco-sensitive areas I inter-State boundaries

-2-

43

265

178-'I . '\..

· '

14 Raw materials ..

(including process Raw 'Quantity Source Mode of

chemicals, Catalysts& materi«l Total Of transport'

additives). Bx.isti Expansi TCD Materials ation

·'

I ng on 3000 3500 TCD TCD

Sugar. Factory

Sugar 3500 3000 6500 From Through caneTPD Member trucks

farmers & bullock carts

Lubricant 105.1 90 195.1 Supplied In (oil & by outside barrel/po grease) parties lythene kg/d bags Lime 5.6 4.8 10.4 through (TPD) vehicle

Sulphur 1.75 1.5 3.25 (TPD) . ,.

-, Co-g en

\. Bagasse Season- 1557. From sugar (TPD) 1557.12 12 unit

Off- 228 season-228

15 Production details Product/ Quantity Total Byproduct Existing Proposed (TPD) (TPD) ·

(TPD) Sug_ar Factory

402.5 356.50

759

Sugar (11.5%

( 11.8% Sugar Sugar Recovery)

Recovery)

Molasses 141.66 124.00 265.66

( Press Mud 141.66 124.00 265.66 Bagasse

980.00 840.00 1820

Generation Co-gen Electricity -- Season- 18 MW 18MW

Off-season- 6 MW 6MW 16 Process details I Manufacturing Process details are giveri in EIA

manufacturing details

-17 Rain Water-Harvesting Level of the Ground water table: 70 - 80 m

-~ ..

(RWH) • Size and no ofRWH tank(s) and Quantity: 150m3; 3Nos. • Location of the RWH tank(s): Ground

-3-

50

266

179

• Size, no's of recharge pits and Quantity: NA

18 Total Water Total water requirement: Requirement • Fresh water (CMD)& Source: 1356.8 M3/day and source: Nira

canal & Pune irrigation division • Recycled water (CMD): 545 CMD treated water from ETP & STP reuse for irrigation of sugarcane cultivation & gardening. - Conde.nsate water after treatment will be recycled in process; . thereby the fresh water requirement will be reduced by 600 cum/day.

Useofthe Existin Proposed Total Quantity water: g (CMD) (CMD)

(CMD) Domestic 25 20 45 Process 400 350 750 Cooling 100 100 200 Boiler 75 130 205 Floor washing 10 10 20 Cooling tower - 136.80 136.80 Make up water for Co-gen Gardening & 545(treated Irrigation water from ETP) -.-TQtal 610 746.8 1356.8

19 Storm water drainage • Natural water drainage pattern: Storm water collection and conveyance arrangement through closed RCC pipeline has been provided in the premises. The storm water is discharged at lowest point in the premises of industry and through percolation and infiltration it enriches the ground water table. • Quantity of storm water: Rainfall in the area is about 579 mm. Most of the region comes under semi urban to rural category with well-developed infrastructure of paved roads and other industrial plots in adjacent premises. • Size of SWD: 250 x 300 mm.

20 Sewage generation and treatment Amount of sewage generation (CMD): 36 cum/day.

Proposed treatment for the sewage: STP Capacity of the STP (CMD) (If applicable): 40 CMD

21 Effluent characteristic ETP Characteristics

Sr Outlet Effluent

Parameters Inlet Effluent Effluent Discharge

N Characteristic Characteristi Standards (CPCB I

o. c MPCB)

1 pH 4-4.5 5.5-9 5.5-8.5 2 BOD 1000-1500 < 100 100 mg/1 3 COD . 2000-3000 <250 250 mg/1 4 TSS 400-500 <100 l{lO'mgll

5 TDS 545-762 :52100 2100

mg/1

-4-

51

267

180

STP Characteristics

Sr Outlet Effluent

Pa(iJTleters Inlet Effluent Effluent Discharge . Standards

N Characteristic Characteristi (CPCB/ 0. c MPCB) 1 pH 7-8.5 7.0-7.5 5.5-8.5 2 BOD 200-350 <100 100 mg/1 3 COD 400-500 <100 250 mg/1 4 TSS 200-450 <50 100 mg/1 5 O&G 10 <10 10 mg/1

22 ETP details Amount of effluent generation (CMD): 509 CMD • Capacity of the ETP (CMD) : 600M3 (Existing+ proposed expansion) • Amount of treated effluent recycled (CMD): Treated water shall be used for irrigation purpose. • Membership ofthe CETP (If require): NA

23 Note onETP ETP technology comprises- Primary treatment, Primary technology biological treatment, Secondary biological treatment, Sludge to be used treatment

The units ofETP are Screen chamber, 0 & G skimmer, Equalization tank, Primary clarifier, Bio tower, Aeration tank, Secondary clarifier, Sludge drying beds, Pressure sand & activated carbon filters

24 Disposal of the ETP Shall be used as manure in own premises sh.tdge (If applicable)

25 Solid waste Non-hazardous solid waste Management # Unit Waste & Treatment Disposal

Quantity, TPD 1 Canteen 0.250 Compost Own Garden 2 Colony 0.600 Compost Facto_!Yfarm 3 Sugar ETP 0.42 ETP sludge Own garden

Unit sludge Oil & 0.10 Flotation Mixed with grease Technique Bagasse

&burnt 4 Co-gen Bagasse 31.12 mixed with As soil

Units ash PMC conditioner (sugar)

5 Co-gen Bagasse 4.56 mixed with As soil Units Ash PMC conditioner (sugar) Off season

Hazardous Solid waste .

~-

J Industrial I Type ofwaste & # Unit their qty. I Category I Disposal

-5-

268

181

Would~

Sugar Wastes/ residue mixed with

1 - containing oil- As Bagasse & Unit

and when generated 34.4

burnt in boiler

26 Atn;tospheric Emissions (Flue gas

Sr. Source of Emission rate Concentration

characteristics Pollutant in flue gas SPM, S02, NOx, CO, No Emission (kg/hr)

(g/m3) etc.)

1 SPM 6.63 Negligible

2 S02 Boiler 0.83 Negligible stack

3 NOx -- -

27 Stack emission Details: Existing stack details -(All the stacks attached

Height Internal Temp.

to process units, Plant Stack from Diameter

Emission of BoHers, captive power Section

No. ground (Top) Rate Exhaus

plant, D.G. Sets, & units level(m) (m)

(m/s) t Incinerator both for Gases existing and proposed Boiler (22 &

1 70 3 15 150°C activity). Please 35 TPH) indicate the specific D.Gset 3.0m section to which the (500KVAx

2 (above

1.5 05 120°C st~ck is attached. 2) roof e.g.: Process section, level) D.G. Set, Boiler, Power Plant, incinerator etc. Expansion stack details-Emission rate (kg/hr.)

Height Internal Temp. for each pollutant Plant Emission of (SPM, S02, NOx etc. Section

Stack from Diameter Rate Exhaus

should be specified & units No. · ground (Top)

(m/s) t level(m) (m) Gases

Boiler(70 & 1 76 2.5 20 150°C

35 TPH) D.Gset 3.0m (750KVAx

2 (above

1.8 10 120°C 2) roof

level) 28 Emission Standard

Sr. Pollutant Emission Standard MPCB Consent No. Limit (~g/Nm3) 1 SPM 500 150 mg/Nm3

2 S02· 80 960 Kg/day

-6-

269

182

29 Ambient Air Quality Data

30 Details ofFuel to be used:

31 Energy

32 Green Belt Development

Permissible Baseline

Sr. Pollutant Concentration No.

.. Standard Max. at project Remarks (in f!g/m3) site (in f!g/m3)

1 PM to 100 62.5 Within limit 2 PMu 60 30.5 Within limit 3 S02 80 9.6 Within limit 4 NOx 80 15.8 Within limit 5 co 4 0.281 --Sr. Daily Calorific N Fuel Consumption value

% % Ash Sulphur

0 (TPDIKLD) (K calslkg) Season-

l. Bagasse 1557.12

2200 2 0.1 Offseason-228

2. Agro waste

9572 2000 18 0.02

3. Diesel 0.480 10,200 0.1 0.6 Power supply: • power requirement: During season- 7.30 MW

Off-season- 0.65 MW DG sets: • Number and capacity ofDG set to be used: 500 KVA x 2 No & 750KVAx2No • Greeri belt area: 57182.08 Sq Mt. • Number and species of trees to be planted: Existing-Common Name Botanical Names Quantity

Neem Azadirachta indica 250 Mango Mangifera Indica 175 Yellow Gulmohar Peltophorum pterocarpum 75 Bahava Cassia fistula 87 Jambhul Syzigiurn cumini 36 Moh Madhuca Longifolia 77 Total 700

Proposed-Common Name Botanical Names Quantity

SitaAshok Saraca Asoka 700 A pta Bauhinia racemosa 223 Pal as Butea monosperma 100 Kadamb Anthocephallus cadamba 190 Ber Ziziphus mauritiana 100 Shivan Gmelina arborea .2.4"0

Shirish Albizia lebbeck 347

-7-

') \.!

"" 270

183

Maharukh Ailanthus excelsa 375

Karanj Pongamia pinnata 380

Katesavar Bombax ceiba 250

Fish tail palm Caryota urens 195

Nandruk Ficus retusa 200

SonSon chafa Mi Michelia champaca 200

Total 3500

• Number, size, age and species of trees to be cut, trees to be Transplanted: NA

33 Details of Pollution Sr. Aspect

Existing PoJlution Proposed to be Control Systems: No. Control system installed

Boiler stack- Stack height with 76 m,

Boiler stack- Stack ESP system. height with 70 m, Bag filter to

1 Air Multi cyclone system existing DG stack- stack Multicyclone height with 3m above system roof level DG stack- stack

- height with 3m above roof level ·--

ETP & Septic tank ETP&STP 2 Water

followed by soak pit The Methodologies of Same pn:~ctice as isolation & that under existing separation, covering, operations shaH

3 Noise insulation etc. are observed adopted in existing unit Moreover the workers are provided with PPE C<\nteen, colony Same practice as waste- composting & that under existing use as manure operations shall ETP sludge- use as observed

4 Solid manure Waste Bagasse ash- Mixed

with PMC & use as a ... soil conditioner Oil & grease- Mix with Bagasse & burnt

-8- ss

271

184

34 Environmental • Capital cost (With break up) : 1126.05 lacs Management plan • O&M cost (With break up): 86.1 lacs Budgetary Allocation Sr. PlU1iculars Capital Recurring Cost

No. Cost per annum (Lacs) (Lacs)

1 Air Pollution Control 600 30

2 Effluent Treatment Facility 450 35

3 Noise Pollution Control 1.05 0.10

4 Environment Monitoring & 25 1 Management

5 Occupational Health - 5

6 Green Belt Development 35 5

7 Rain Water Harvesting 15 -8 CSR activity - 10

Total 1126.0 86.1 5

35 EIA Submitted (If yes Yes, EIA submitted on 29.4.2016 then submit the salient Period of Study from Feb 2015- April2015 features) Primary data collected by A Lab approved by MoEF; New Delhi

~econdary data collected from Indian Metrological Department, District Census Handbook published by census oflndia ?.011 & Survey of India.

36 Public hearing report Conducted on 19.11.2015. Received P.ublic hearing proceedines (If public hearing vide MPCB letlt:r no. MPCBIRLP!fB conducted then submit Venue: - M/s. Shri Chhatrapati Sahakari Sakhar Karkhana Ltd. the salient AlP- Bhavaninagar Tal- Indapur Dist-Pune features) Date & Time: -19.11 .2015 11 :00 AM.

Panel:- 2 Members. Members ofPublic: {)5 No Chairmanship: - Shri Suresh Jadhav (Addl. District Magistrate-Pune)

37 Air pollution, water NA pollution issues in the project area, If any

38 Storage of chemicals NA (inflammable/explosive /hazardous/toxic substances)-

3. The proposal has been considered by SEIAA in its l05th meeting & decided to accord environmental clearance to the said project under the provisions of Environment Impact Assessment Notification, 2006 subject to implementation of the following terms and conditions:

General Conditions for Pre- construction phase: -

-9-

272

185

(i) No additional land shall be used /acquired for any activity of the project without obtaining proper permission.

(ii) Molasis storage Tank capacity shall be 35000 MT and care shall be taken that no percolation takes is possible from these storage tanks

(iii) PP to take utmost precaution for the health and safety of the people working in the unit as also for protecting the environment.

(iv) For controlling fugitive natural dust, regular sprinkling of water & wind shields at appropriate distances in vulnerable areas of the plant shall be ensured.

(v) Proper Housekeeping programmers shall be implemented. (vi) In the-event of the failure of any pollution control system adopted by the unit, the unit

shall be immediately put out of operation and shall not be restarted until the desired efficiency has been achieve.

(vii) A stack of adequate height based on DG set capacity shall be provided for control and dispersion of pollutant from DG set. (If applicahle ).

(viii) A detailed scheme for rainwater harvesting shall be prepared and implemented to recharge ground water.

(ix) Arrangement shall be made that effiuent and storm water does not get mixed.

(x) Periodic monitoring of ground water shall be undertaken and results analyzed to ascertain any change in the quality ofwater. Results shall be regularly submitted to the Maharashtra Pollution Control Board.

(xi) Noise level shall be maintained as per standards. For people working in the high noise area, requisite personal protective equipment like earplugs etc. shall be provided.

(xii) The overall noise levels in and around the plant are shall be kept well within the standards by providing noise control measures including acoustic hoods, silencers, enclosures, etc. on all sources of noise generation. The ambient noise levels shall confirm to the standards prescribed under Environment (Protection) Act, 1986 Rules, 1989.

(xiii) Green belt shall be developed & maintained around the plant periphery. Green Belt Development shall be carried out considering CPCB guidelines including selection of plant species and in consultation with the local DFO/ Agriculture Dept.

(xiv) Adequate safety measures shall be provided to limit the risk zone within the plant boundary, in case of ilU accident. ~k u~;Lcclion devices shall also be Installed at strategic places for early detection and warning.

(xv) Occupational health surveillance of the workers shall be done on a regular basis and record maintained as per Factories Act.

(xvi) The company shall make the arrangement for protection of possible fire hazards ....... during manufacturing process in material handling.

-10-

273

186

J

(xvii) The project authorities must strictly comply with the rules and regulations with regard to handling and disposal of hazardous wastes in accordance with the Hazardous Waste (Management and Handling) Rules, 2003 (amended). Authorization from the MPCB shall be obtained for collectio~/treatment/storage/disposal of hazardous wastes.

(xvi'ii) The company shall undertake following Waste Minimization Measures: • Metering of quantities of active ingredients to minimize waste. • Reuse of by- products from the process as raw materials or as raw materia·!

substitutes in other process. • Maximizing Recoveries. • Use of automated material transfer system to minimize spillage.

(xix) Regular mock drills for the .on-site emergency management plan shall be carried out. Implementation of changes I improvements required, if any, in the on-site management plan shall be ensured.

(xx) A separate environment management cell with qualified staff shall be set up for implementation of the stipulated environmental safeguards.

(xxi) Separate funds shall be allocated for implementation of environmental protection meast.~res/EMP along with item-wise breaks-up. These cost shall be included as part of the project cost The funds earmarked for the environment protection measures shall not be diverted for other purposes and year-wise expenditure should reported to the MPCB & this department

(xxii) The project management shall advertise at least in two local newspapers widely circulated in the region around the project, one of which shall be in the marathi language of the local concerned within seven days of issue of this letter, informing that the project has been accorded environmental clearance and copies of clearance letter are available with the Maharashtra Pollution Control Board and may also be seen at Website at http://ec.maharashtra.gov.in

(xxiii) Project management should submit half yearly compliance reports in respect of the stipulated prior environment clearance terms and conditions in hard & soft copies to the MPCB & this department, on 1st June & 1st December of each calendar year.

(x.xiv) A copy of the clearance letter shall be sent by proponent to the concerned Municipal Corporation and the local NGO, if any, from whom suggestions/representations, if any, were received while processing the proposal. The clearance letter shall also be put on the website of the Company by the proponent.

(xxv) The proponent shall upload the status of compliance of the stipulated EC conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of MoEF, the respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely; SPM, RSPM. S02, NOx (ambient levels as well as stack emissions) or critical sectorai parameters, indicated for the project shall be monitored and ·displayed at a convenient location near the main gate of the company in the public domain.

(xxvi) The project proponent shall also suhmit six monthly reports on the status of compliance of the stipulated EC conditions including results of monitored..aata (both in hard copies as well as by e-mail) to the respective Regional Office of MoEF, the respective Zonal Office of CPCB and the SPCB.

- 11-

!/)

58

274

187

(xxvii) The environmental statement for each financial year ending 3Pt March inForm-Vas is mandated to be submitted by the project proponent to the concerned State Pollution Control Board as prescribed untter the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance ofEC conditions and shall also be sent to the respective Regional Offices ofMoEF by e-mail.

4. The environmental clearance is being issued without prejudice to the action initiated under EP Act or any court case pending in the court of law and it does not mean that project proponent has not violated any environmental laws in the past and whateve~ decision under EP Act or of the Hon'ble court will be binding on the project proponent Hence this clearance does not give immunity to the project proponent in the case filed against him, if any or action initiated under EP Act.

5. The Environment department reserves the right to revoke the clearance if conditions stipulated are not implemented to the satisfaction of the department or for that matter, for any other ad111inistrative reason.

6. Validity of Environment Clearance: The environmental clearance accorded shall be valid for a period of 7 years as per MoEF & CC Notification dated 29th April, 2015 to start of production operations.

7. In case of any deviation or alteration in the project proposed from those submitted to this department for clearance, a fresh reference should be made to the department to assess the adequacy of the condition(s) imposed and to incorporate additional environmental protection measures required, if any.

8. The above stipulations would be enforced among others under the Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution ) Act, 1981, the Environment (Protection) Act, 1986 and rules there under, Hazardous Wastes (Management and Handling ) Rules, 1989 and its amendments, the public Liability Insurance Act, 1991 and its amendments.

9. Any appeal against this environmental clearance shall lie with the National Green Tribunal (Western Zone Bench, Pune), New Administrative Building, P1 Floor, D-, Wing, Opposite Council Hall, Pune, if preferred, within 30 days as prescribed under

Copy to:

Section 16 of the National Green Tribunal Act, 2010.

1. Shri T. C. Benjamin, lAS (Retired), Chairman, SEAC-I, 602, PECAN, Marigold, B_ehind Gold Adlahs, Kalyani Nagar, Ptmc - 411014 ..

2. Additional Secretary, MoEF & CC, Indira Paryavaran Bhavan, Jorbagh Road, Aliganj, New Delhi-110003.

3. Member Secretary, Maharashtra Pollution Control Board, with request to display a copy of the clearance.

4. Regional Office (WCZ), Ministry of Environment, Forest and Climate_ Change, ~~r ~

5. Regional Office, .ivJPCB, Pune.

-12-

./

S_j

275

188

T tt I&· q>;J .... 9 ~~I fu .fJ

-rrf.r / ­

(:11.~. ~l if,l•l•fl"fl dYJt-l;f,

w.~ ~(>·l'll;l ~ ·nl"r:..fRl fu.

Public Notice ri atrapati Sahakari Sakhar Karkhana Lid

o avanrnag~ r Ta uka lndapur Otstnct Pune Mahara n a - 413104

Thls ,s to ,nfot m all that the tate Ef11 ron men pact Assessment Authority Government of Maharashtra Mumbai l1as granted Env1romnental Clearance' da 03 Dec 2016 to M/s Shri Chnatrapatl Sahakari Sakha Karkhana Ltm1ted, located at Bhavanmagar al '< - tr da pur, Distnct- Pune t.liaharashtra- 413104 for ex pans on its sugar unit from 3.500 TCD to 6.500 TCO and along

' cogeneration unit 18 MVt1 The 'Envrronmental Ctearance · granted under the provts·on of EIA nof"ficatio da ed 1

September 2006 The copy of env1ronmentai clearance available on the website \ www ecmpcb .mllog"1 granted ec_certificate) Th•s advertisement is publi hed tn fhe L.R.Itl~ interest, according to the Qeneral conditions specified an •Environmenta' Clearance'.

S ign {G M. Anarase

Managing

276

189

•1.-;wJ.t.~ ''h

il•iil"'r-"'' jq!;fft.fi'"" aq;r.ii 'l fir. . ~ ,....~ ... 11 .11'!1';

~ rr""""'

v;1 ~ l"fttrnr-t

.;;'! ~1::: ""' ~~ F.T=: • '3rt<lmr. "'rnl't ~ ~ ~ • lj;:t'!'.:T,f;l ~t'fR :or'• ~ ~ ~-m~ ~ ~

« '(!" , 4,.,-.., """',_ -rn~r-ml !"fl'll 'f'' q

Tfi" ~ ~- '"""" 7i{~ Ill •1"1!1\IT ..

:r.lrrn: r-« ff~. "''! oi:··tf n:rwr in' '!~ ~"' i ~ '*'-"11 .. tf:ro'c ~~ :f11'·~ tl<4# !1'" ~ lJit"'lll! "l""".IT.il ?T'I ~

• ~ ~· lq ,n ¢~ J{i:., • !f'r!n'• :Q ~ ~ ~ ~J"u( ";;JT.Vtr.fl

'1!! irt;c.l'l..,.~

~~~~~~~~~~~~~~~~~- n ..,..,. ~ ""* ri ,_mr<ill ~ !.t1.1:1&< ,...,....., " "" QT.(t . ~

-r~ """'.j ~,...-n f 1f'P' · ~""·;r •)~ f.Ji"y J"PP l:Tl ~1_ ... ~} ~~ • •• -o , ... NCJ.I Vo'l -~~)- -'TfN ~ 1J1"'h o,;r:"'"" ~ f";if_p(Wl" r<if ;::r""'..,.ff~ ....:a 7l-A ~ ~ -~ m.m -'fl .. _..., .....t.A -nA - fQfta 'f"D ~ ~ """"" 'X1a "" ..._ ..... ,, ., ..... ,_ -

•'1:'1• ~ 'IP{'llirm~...r.::! - ria rp.

~ •• ""'"'""" ~-~-- ... firil " ""'"' -,....,.li1I:"'\'!!!IJ<:ter"' "''.......,, """ ~ ~ ~ ~

" 'U ~ . :Al· R:' Inn - ri ....... ~ llt..t ~ v; .-.w1;» , ._,,., ~ ~,. ..,....,.....~ ir.l.f\C:rrt'f='·'ut i·J•Jin'f

~ ,,.. .;o::n ~ vw• PM"! mp "'!T'f '!'lin "'"'l'l ..,.,.,.,, nii __ ,., 'f"'il ~- ;.Mil~~

w.:tt iilfiU ltf ..rtorrwrii 'l!,., ;l'l('lllilf l'fTftr

.,. ... ,..n .,._ .,

'P ..... -,....n QTAiCt ft'JI;-.n ....

,..~""' "" ... ;; """* ...... 11 ,..,..,

- • ,.;....., '1frP. -re •lfll""'''t~l-- 'f1P1 '!I~ _ ......

..... """' .. '!,'4 ........ ~~ ...................... -. 11fa .... ... ,. ...... _ .... _ --­.......

....,..._

~ ""~""" """ • ~tfc .. r• 1 .w: •

• ~ .:,. \ ~ ~ ·~ ~ .... Q

.,._....,.. .... .,..~ .,...,. :vr"J ,.,. .....

~ • • , .. yn • .,

CD!'~~'ff

•! ~ .. =· ~""' ,....... .... _ ----............. ..... _ .. ._.,.. *f.IIJ~- .... ..... t• ,_, __., _....,........,_ ............. --.~~- ...........

"' """''~~'• 3Z'R" .m: :m mn ••.r. :nlf'l: >ttl. il ,..,- ~~ >r7'11":

r.t:t .n llf~r-" ~~·

~i"" [H if!'' ~.,....,

:tf~i!WNt~lt !lmR ~·~ 'J f.'iiRPlf:Cl~ ·m~ :f''::l"(Rilli ~t· t -fC .., ~ • .,-..-_ liT :"!U""" ...

m W;q:rr-'"' '1'1'"1· ~- ::1'!'111'1

-~~­<*-: ~

"'""" '>r-lf• .~- ...... c.: ~ "' ~'""""' .......... , ~ """'""'--- ., ~ ................ qul>~..w .mm 'fo""•"' 111n.- &State Envctonmef11 sessmeot A.rthontylliA'ft .,_ "iii- · ~u .o:r ~ ~ ~•Enviroomenral~ancet linl1A ~-· ···-•• · ~fc II~ i!CG·- .......... ,__

1www.ecmpcb inJtogurtlgral\~llld_.~.c:e~lii::AIAI

Scanned with CamScanner

277

190.A. ..., ')'\ ~ lJ.,l.(). - Tl: MAHARASHTRA POLLUTION CONTROL BOARD

~98

MAHARASHTRA

wvebsite http:l/mpcb.gov.in

Report No: MPCBIRLPN/JVS/19/2010

Regional Laboratory Jog Centre,3rd Floor Wakade Wadi, Pune-Mumbai Road, Shivaji Nagar.

E-mail [email protected]

Date: 05/06/2020

ANALYSIS REPORT-WATER (JVS)

Industry Name & Address Shri Chatrapati SSK Ltd.,

Industry Code lndapur,Pune

Type Of Industry

Consent No

Dl & Time of Sample Collection 27/01 /2020 09:26:00

SampleiD SROPN 1/JVS/1"9107043 Sample Source ETP

Lab Sample Code RLPN/JVS/19/02722

Sample Location Outlet Location Details

Collected By Sarjerao Jaysing Bhoi Seal No.

Dl of Submission 29/01/2020 Dlof Receipt 06/0212020

Sr. No Parameter UoM Results

1 BOD mg/lit 21 .0

2 C.O.D mg/lit 48.0

3 Oil & Grease mgllit BDL

4 pH 7.0

5 Suspended Solids mg/lit BDL

6 Chlorides mg/lit 185.9

7 Sulphate mg/lit 15.1

8 T.D.Solids mg/lit 866.0

NA : Not Analysed BDL : Below Detection Limit • • NO : Not Detectable UoM : Unit Of Measuerment

•• Electronic report does not require signature 1

Reviewed By

Suresh V, Bhosle

Scientific Officer

1/C ,Regional Laboratory - Pune

'

278

191

Phone1

Phone1

Fax

02025811698

02025811698

02581 1029

MAHARASHTRA POLLUTION CONTROL BOARD

Regional Laboratory Jog Centre,3rd Floor Wakade Wadi, Pune-Mumbai Road, Shivaji Nagar.

·website : http://mpcb.gov.in E-mail [email protected]

Report No: MPCB/RLPN/NS/2012114 Date: 01/0212021

ANALYSIS REPORT-WATER (JVS)

Industry Name & Address Chatrapati SSK Industry Code

Ty pe Of Industry

Consent No

Dt & Time of Sample Collection 07/01 /2021 09:38:00

Sample iD SROPN 1/JVS/20/07 440 Sample Source ETP

Lab Sample Code RLPN/JVS/20/00996

Sample Location Outlet Location Details

Collected By Suryakant J. Shinde Seal No •

Dt of Submission 08/01/2021 . .

Dtof Receipt 13/01/2021

Sr.No Parameter UoM Results

1 BOD mg/lit 90.0

2 C.O.D m9/lil 236.0

3 Oil & Grease mg/lit 2.2

4 pH 7.2

5 Suspended Solids mg/lit 28.0

6 Chlorides mg/lit 35.0

7 Sulphate mg/lit 55.2

8 T.D.Solids mg/lil 280.0

NA : Not Analysed BDL : Below Detection Limit NO : Not Detectable UoM : Unit Of Measuerment

•• Electronic report does not require signature 1

Reviewed By

Dr.P.D.Khadkikar

Scientific Officer

1/C ,Regional Laboratory - Pune

63

279

192

~') S3Jtrfa ~ 645RT ~T~~ CJ5 r '< 'lCl JOlT far; 'ICn9!1~tR, m. ~~~. ~. !UT

- ~~rtFf"d=a·JI:

~: '"~''H,3\\'~'' '\\'~' ~wi\"tr :.,tt~ '\''~'( ~;m , .~n~-''''"'' 'fr. ~.ifit1ffn l ''''l.t\ if.~.~ .• ,\,,~, for-mf '\\'~ ~

~iSHICS( ~ (~tn'r} fl:rir ~'br ij~~~0\1 ' Quality Endorsed Company ~

. c ~~m J

ifrolfffi'-~ ~ ~

l'IR"a( qm II

' fM~I\@11<' 'tl;clofl<i•l< (~)

Shri Chhatrapati S. S. K. Ltd; BHAVANINAGAR, TAL.. INDAPUR, DIST. PUNE PIN CODE 413104 - MAHARASHTRA (INDIA)

..

~ ~lfi";ti 1 Outward No./ Mfg./g OD9- /2020-2021 f~: '2-o It! ');02.)

By Hand Delivery

To,

Hon'ble Joint Committee,

formed under NGTOA 63/2020

Through Sub Regional Officer, Pune II,

Maharashtra Pollution Control Board, Pune

Subject

Reference

R/Sir,

Wet Scrubber installation for our 3500 TCD (Unit -1) sugar plant.

Honorable Joint Committee Visit on dated 07.01.2021 as per Honorable NGT order dated ------ in Original Application 63/2020 Vikramsinh Manikarao Patil and Ors. Vs Shri Chhatrapati Sahakari Sakhar Karkhana Ltd. Bhavaninagar and Ors.

With reference to the above subject, we would like to inform you that, we are going to install new Wet Scrubber system for our 3500 TCD sugar Plant (Unit-1) which is more favorable to our low-pressure boiler (17 KG). An exist ing dust collector system for air pollution control system to attached to Our 3500 Unit no.1 has been not working properly and currently not getting the expected efficiency as per norms of State and Central pollution board . So that instead of dust collector, we decided to install Wet Scrubber system for our unit no.l. Due to the pandemic Of COVID -19 financially badly impacted on our sugar factory so work progress of installation of wet scrubber got delayed f rom our end.

In this regard, the Board meeting of the our Board of Directors held on dated

23/12/2020, a resolution has been passed regarding the financial provision for the above

wet scrubber .we have invited quotations from various companies. We will soon complete

the work by giving the work order to the right company. The factory taking positive steps for

complete work for same and we assure you that, the Erection and commissioning work of

Wet scrubber wi ll be completed in next four months. Thanking You

Copy To: 1] Mfg with p.c., 2] Gen. Offic 3] Extra -1.

Yours Faithfully

Managin Director

Tal: lndapur, Dist: Pune

280

193

Phone: (021 18) 66231/ 66232 F OA •n. (0? 1 l ~) 66?53 E· Moil: scss b a.;gmoil.com

Shri Chhatrapati Sahakari Sakhar Karkhana Ltd., Bhavaninagar, Tal.lndapur. Dist: Pune

Ref. No.: SCCK/Co-gen./ 1 ' ) I\ / 2020-21 Ref. Date: 11 /01/2021

To, M/s. Cascade Engineers S.No.- 624/9/39. Kuruli, Near Gabriel Indio. Chakon. Tal: Khed. Dist: Pune

Sub: letter of Intent for letter of Intent&. agreement fo r design, manufacture, supply erection & commissioning of Wet sreubber system for controll ing fly ash for our 35 TPH x 1 No. & 20 TPH x 02 No. Boiler having working pressure 21 Kg/cm2 and 3150C steam temperature.

Ref: Commercial Meeting held on 23/ 12/2020 at factory site.

Dear Sir. With reference to above and fur1her commercial meeting held on 23/12/2020 at factory site. we

taereby place on order for design. manufacture. supply. erection & commissioning of Wet Scrubber System for controlling fly ash for our 35TPH & 20TPH Boiler having working pressure 21 Kg/cm2 and 3150C steam temperature.

Sr. No. Packag e Total Price (In Rs.) a.

1

b.

Price for design. manufac ture. sup --:-- -----7--

ply of Wet scrubber system for controlling fly ash for our 35TPH x having working pressure 21 Kg/cm2

1 No. & 20TPH x 02 No. Boiler and 3150C steam temperature

exclusive of all taxes with the te rms & conditions mentioned hereunder. Errec tion & Commissioning Labour charges for exclusive of all

ditions mentioned hereunder. taxes works with the terms and con ,, I

Total I

Rs. 65.00 Lacs

Rs. 5.00 Lacs

Rs. 70.00 Lacs Taxes - Extra as

applicable

- lther Terms & Conditions

1) The supplier shall be guaranteed for the materials and per1ormance for a period of two crushing season. The equipments shall be guaranteed for the workmanship of material satisfactory performance. The guarantee for performance sha ll cover individual items. The manufacture shall conduc t p erformance/acceptance tests to demonstrate the equipment supplied is capable of a chieving the parameters with respective efficiency, capacity. as specified in the enclosure along with tender.

2) All drawings and technical specifications shall be got welted by us before execution. 3) The material manufactured at your works and or at sub-contractor works w ill be inspected by

us before dispatch. if required by us. 4) You are requested to entering into the contrac t a greement incorporating the above points

an detailing the scope of works and supply at an early dale. 5) The erection and commissioning work will be completed by your erection contractor by

30/04/2021 . ;s

281

1946) l' or delov r. ; .. , 1 ·y • ' r. •' • · .r·or·nonce. the some will be as per above te!oned

aqreement & ;er o •• <Jll •ll" • 1

7) TE. r 1s & cono ··c ~ .:> t ;;n, '1• 1 wri ~~ 1s p ~r payment scnedule as provided ir. agreement ao'ed ll 'h January 20~COC notms)

8) All terms & cc~ndif on~ o·< '> 11 1 • '"' '• 1 r Jrc ol & other points will be as per agreement dated 11 rh January 2021.

Please sign the duplica te copy o f the or< ler as a token of acceptance and arra nge for signing o f agreement at the earliest

Thanking you.

Copy to: 1) Engg. With P.C.. 2) Gen. Office.

Yours Faithfully,

(G.M~­Managing Director

Shn Chhatrapati S.S. K. Ltd . Bhavoninagor

l

282

195

SHREE CHHATRAPATI SAHAKARI SAKHAR KARKHANA LTD; BHAVANINAGAR

Tal- lndapur, Dist- Pune

A) Cool ing Tower Details :

SR. NO. TECH. DESCRIPTION QTY 1 Natural draft cooling Tower 02

Square shape-24m X 24m Water flow- 85 cu.m/hr To be cooled in two stages from 80 deg C to 35 deg C

2 Pump CG make 02 -Discharge 22 Ips, Head- 22 mtr. With 12.5 Hp/2900 rpm motor, base frame and coupling

B) Co-gen Cooling tower details -

T he brief technical specifications are as fo llows :

Type Induced draught rectangular counter !low

o. ol'cclls

No. of scts

Designs per Cell:

\\'at.:r .:irculati1m r~1tl'

Tem perature Inlet I Outlet

Wet Bulb 1-:rnpcraturc

l'rc;.sure at Inlet Flange

Materia l of Const ruction:

Frame work

Casing I Fan cylinder I

S;air case

Two ( I + I )

One

750 CM II

40"C I 32"C

28 °C

3.00MW

FRP Purtruded section

FRP Purtruded section

fRP Purtrudcd section

NOS.

Nos.

Nos.

283

196

Basin I Air entry I

Mounting

Fills I Noa le

Bolts, Nuts, misc. Hardware

Water inlet header

Fan blades

Fan Hub

I an ~han

Fan :

"Jypc

Diameter I speed

Static Pressure

Gear Box:

Ratio

Electric motor Drive:

Total II.P I RPM

Losses:

Evaporation Loss

Oriflloss (max)

Mak.: up "Cllcr quality

RCC (By purchaser) only basin with RCC columns

of500 mm height from basin bottom shall be given

by purchaser

PVC I polypropylene

ss 304

PVC (FRP Lined)

FRP

Cast Aluminum Alloy & M HOG

E 8

Axial flow, Gear driven

8530 mm I 114 RPM

53 Pa

12.6: I

upplier to give details.

1.2 10% of water circulation

0.005% of water circulation

1.336% of water circulation

C ooling Tower Pumps- (2 ' os. + I Spare)

'ipru~ \\ att·r pumps O:<h:h capahh: of dd iv..:ring750 Cu.Ml ll r of\\ at..:r. suitat>k f\1r 40 M h..:ull. ,1f

<II I• & (o\.1 I 'II ·lk·r \\ith dri\. lll<•tnr \llpipmg& \ahcsh .. ·~·llldth .. ·s,·pumps

Priming Pump - One No.

284

197

T.C.

t\~ ~ \0

..(,-31-

I M

aharash

tra Po

llutio

n C

on

trol B

oard

S

ite Nam

e: M

/s Shree C

hhatrapati Sahakari S

akhar Karkhana Ltd

~

'-.n ~\

From D

ate: 20

20

/11

/01

To Date: 2

02

1/0

4/0

1

Report N

ame: C

ustom R

eport

51 No

. T

ime

E

TP-C

OD

U

E

TP-B

OD

U

ETP

-TSS U

ETP

-pH

U

ETP-F

iow

U

STA

CK

-PM

U

S

TAC

K

2-SP

M

U

i

1 P

rescribed Standards

0-1

00

0

-10

0

0-

100 0

-10

0

0-1

00

0

-10

0

0-1

50

2 M

axim

um

Value

147.56

70

.8 95

.61 9.23

NA

N

A

23.29

3 M

axim

um

Value A

t Tim

e 2021-02

-06

2021-02-06

2021-03-12 2021-01-28

NA

N

A

2021-03-28

4 M

inim

um

Value

17.48 7

4.43 3.6

NA

N

A

10.22

5 M

inim

um

Value A

t Tim

e 2021-0

1-21 2021-01-21

2021-01-20 2021-01

-22 N

A

NA

2021

-03-21

6 G

eo

me

tric Me

an

53.16

24.53 4

8.11

7.17

NA

N

A

19.16

7 M

ed

ian

55.01

26.4

41

.54 7.45

NA

N

A

20.26

8 S

tandard De

viatio

n

22.33

11.49 1

5.33

0.8

4

NA

N

A

3.89

9 V

alid Data P

oints 101

101 98

101 0

0 4

4

10

T

ota

l Data P

oints 152

152 152

152 152

152 152

11

D

ata

Ava

ilab

lity%

66.45 6

6.45 64.47

66.45 0

0 28.95

285

Shri. Chhatrapati Saharaki Sakhar Karkhana Ltd, Bhawaninagar

Sr. Consent Application

Number

Consent Validity

Consent Application

No

Prior (Days)

Delay (Days)

Remark

1 MPCB-CONSENT-

0000094643

2021.07.31 2021.05.11 82 - Crushing season

started on 2021.10.25

2 MPCB-CONSENT-

0000073543

2020.07.31 2020.07.12 19 - Crushing season

started on 2020.10.28

3 MPCB-

CONSENT-0000030987

2019.07.31 2019.05.21 72 - Crushing

season started on

2019.10.28

4 MPCB-

CONSENT-

0000030950

2019.07.31 2019.05.21 72 - Crushing

season

started on 2019.10.28

Ax. R2

T.C.

286

Ax. R3

T.C.

- C-'JO, C"7~d?"0'/'7-CC' - PU b l iC J\/CtJ (~ · /1 ) nc(..US.j.JC/;Jer

Public Noti e a '~att Saha o

Ta a r.dap Jf 0 str.ct m

our t nc- Dune •. -:1 arasl")tra 4 131 I.S :::;

cogeneratron unn 18 N1 .. T e ·Envrro granted ~"der t!le prov1s 011 of ElF.. o · ica ·en Septemoer 2006 The copy of environmental c t'aranc availa' te the website NV '~ log' ec _ .em ICnte Tn advert! ement pdniJ..,nl'"! mteres accord1 g to the general cond~ 10ns p~

'Environmental Ciearance Sign

, 287

T.C.

~- amJa<itar ~u ~ ~ 3lTroi rnm- mfta ~

_,tr'\.,.........,~-"'

,.. J• 2'".,..... ~~, ........ , ..... ~,.,-m ., II """' ""' I'""" ...................... l' ....-t-r"l"""' ,..... t'plo • ~

-""

"'I'IU'J'tlhr.• • fP"I" ~ ... ' ~ .......... ~ r.c~w- ------

;n"' """ Nir ,_ • .-,, " ..,.;,, n 11r~ lt .;n

.DI1 ''"'' ....

""" ~. ~ ,, ......,., •• ~ •• • 'VIIi w• IIIII _..I&Ol ._

r~•:•JIII•-ri'· ........ """""" ................ Mil

- !JM"" ............ .,._

"'~-- ..... -- ..... . -- il • ._. -· ........ .

.. tA ..... ... ",.,._--­.. __ ..

~ f.rctG;r m~~m'i'T~~

., :~"1' n J8 Qlt'f ,,

Ill~ J 'Iff· ~ Jmrll .,.""' l "'

;:"• ll'l'lnO for'aotl' .. ......, '"""""' - - ' ""'"" ""'., , ... , ... .,~,... 1st.tle EnvtOOIIItl s.o,;smenl Aurlltln~y 1 .,...... ~r- Gl ~ ( In G oEnvuonmeniOII Clearilntet f.R

"., ... ~. t tt ""'"'· ·':.-.. \ .... ~ ~ •WWN cGmpdl on.1og10 grMiod_ac_certr.ca CJq«-.,. ..,,..., -~'I'"' Par-~,.~ !""~, 11 :.11'(

288

411003PuneFax : 025811029

Phone1 : 02025811698

http://mpcb.gov.in

Regional Laboratory

[email protected]

MAHARASHTRA POLLUTION CONTROL BOARD

Phone1 : 02025811698 Jog Centre,3rd FloorWakade Wadi,Pune-Mumbai Road,Shivaji Nagar.

Website :

UoM : Unit Of MeasuermentND : Not DetectableBDL : Below Detection Limit

MPCB/RLPN/JVS/20/2114

Industry Name & Address

Consent No

Dt. & Time of Sample Collection

Chatrapati SSK

07/01/2021 09:38:00

Industry Code

Type Of Industry

Sample ID

Lab Sample Code

Sample Location

Collected By

Dt. of Submission

SROPN1/JVS/20/07440

RLPN/JVS/20/00996

Outlet

Suryakant J. Shinde

08/01/2021

Sample Source

Location Details

Seal No.

Dt.of Receipt

ETP

13/01/2021

Sr.No Parameter UoM Results

1 BOD mg/lit 90.0

2 C.O.D mg/lit 236.0

3 Oil & Grease mg/lit 2.2

4 pH 7.2

5 Suspended Solids mg/lit 28.0

6 Chlorides mg/lit 35.0

7 Sulphate mg/lit 55.2

8 T.D.Solids mg/lit 280.0

ANALYSIS REPORT-WATER (JVS)

Report No:

NA : Not Analysed

Reviewed By

Dr.P.D.Khadkikar

Scientific Officer

I/C ,Regional Laboratory - Pune

Date: 01/02/2021

1** Electronic report does not require signature

Ax. R4

T.C.

289

411003PuneFax : 025811029

Phone1 : 02025811698

http://mpcb.gov.in

Regional Laboratory

[email protected]

MAHARASHTRA POLLUTION CONTROL BOARD

Phone1 : 02025811698 Jog Centre,3rd FloorWakade Wadi,Pune-Mumbai Road,Shivaji Nagar.

Website :

UoM : Unit Of MeasuermentND : Not DetectableBDL : Below Detection Limit

MPCB/RLPN/JVS/19/2010

Industry Name & Address

Consent No

Dt. & Time of Sample Collection

Shri Chatrapati SSK Ltd.,Indapur,Pune

27/01/2020 09:26:00

Industry Code

Type Of Industry

Sample ID

Lab Sample Code

Sample Location

Collected By

Dt. of Submission

SROPN1/JVS/19/07043

RLPN/JVS/19/02722

Outlet

Sarjerao Jaysing Bhoi

29/01/2020

Sample Source

Location Details

Seal No.

Dt.of Receipt

ETP

06/02/2020

Sr.No Parameter UoM Results

1 BOD mg/lit 21.0

2 C.O.D mg/lit 48.0

3 Oil & Grease mg/lit BDL

4 pH 7.0

5 Suspended Solids mg/lit BDL

6 Chlorides mg/lit 185.9

7 Sulphate mg/lit 15.1

8 T.D.Solids mg/lit 866.0

ANALYSIS REPORT-WATER (JVS)

Report No:

NA : Not Analysed

Reviewed By

Suresh V, Bhosle

Scientific Officer

I/C ,Regional Laboratory - Pune

Date: 05/06/2020

1** Electronic report does not require signature

290

411003PuneFax : 025811029

Phone1 : 02025811698

http://mpcb.gov.in

Regional Laboratory

[email protected]

MAHARASHTRA POLLUTION CONTROL BOARD

Phone1 : 02025811698 Jog Centre,3rd FloorWakade Wadi,Pune-Mumbai Road,Shivaji Nagar.

Website :

UoM : Unit Of MeasuermentND : Not DetectableBDL : Below Detection Limit

MPCB/RLPN/JVS/19/1986

Industry Name & Address

Consent No

Dt. & Time of Sample Collection

Chatrapati SSK,Indapur,Pune

10/12/2019 07:51:00

Industry Code

Type Of Industry

Sample ID

Lab Sample Code

Sample Location

Collected By

Dt. of Submission

SROPN1/JVS/19/06929

RLPN/JVS/19/02167

Outlet

Suryakant J. Shinde

11/12/2019

Sample Source

Location Details

Seal No.

Dt.of Receipt

ETP

12/12/2019

Sr.No Parameter UoM Results

1 BOD mg/lit 8.0

2 C.O.D mg/lit 20.0

3 Oil & Grease mg/lit BDL

4 pH 6.8

5 Suspended Solids mg/lit 114.0

6 Chlorides mg/lit 44.0

7 Sulphate mg/lit 32.2

8 T.D.Solids mg/lit 222.0

ANALYSIS REPORT-WATER (JVS)

Report No:

NA : Not Analysed

Reviewed By

Suresh V, Bhosle

Scientific Officer

I/C ,Regional Laboratory - Pune

Date: 05/03/2020

1** Electronic report does not require signature

T.C.

291

Ax. R5

T.C.

" ~ • '$ftiM\iiOI~ Qq-aoq~ :

I \\\\\b " \ \~ \ ~t•'HtG '"''y m • .,u,_,,,,,, Iff. ~ l61'tlitnl I '\ ",_,\

If.~. ~.I '"~" fll'lfffi "'" \

'f4A)~tl~. at. ~. ftt. ~ ~oFU~ :rr.m (m~ ~ ~ \l~~~ov

• Ouahly Eooorse<S Company

~.

~~:

~ lft:lf t<:C Shd Cbhatr ati S. S. K. Ltd.,

~trm : BHAVANINAGAR. TAL. INDAPU~ DIST. PUNE

'ftacvtliiT wact;ft"l'l< (~) PIN CODE 413104 • MAHARASHTRA INDIA

;;nq~ -.;,qi~ : /SCSSK/ENGG/ I 13.5" /2021-22

To, PURCHASE ORDER

M/s. Enviropol Engineers Pvt. Ltd., A-50, Sector-65, I ndustrial Area, PH-III, Noida-201307 (Uttar Pradesh)

f~ : "Z..- I g 12021

Sub: Design, Manufacture, Supply, Erection & Commissioning of Fix Vanes Type Wet Scrubber System (Before ID) Complete In All Respect with Accessories, By Pass System and new Id fan· Assembly Etc..

Dear Sir With reference to above cited subject, we refer to the quotation and discussion with your representative In our

purchase committee meeting held on Dtd. 16/07/ 2021 & further discussion in Our Hon. Board of Directors Meeting Held on Dtd. 29/07/2021 we are pleased to place our firm work order for to supply, erection & commissioning of Fix Vanes Type Wet Scrubber System (Before ID) for maintain CPCB I MPCB norms. The details are as under.

Our Boiler Details:

Make Reg. No. Capacity Working Temp Air Heater Flue Gas Fuel Type Pr. outlet Flue Volume.

gas t emp. TEXMA MR-9924 40T/Hr. 21 320°C 1S0°C 162000 Baggase with co Kg/cm2 m3/ hr 50% Moisture Chimney Height- 60 Mtr& Chimney ID • 04 Mtr

Fix Vanes Type Wet Scrubber System (Before ID) fan should be design for fly-ash arresting with guaranteed performance of Exhaust Emission level not exceeding 50 mg/ NM3& effectively arrests 100% particles of sizes up to 10 micron as per Central /State Pollution Control board latest amendments and Norms.

System Data:

a. Type of System - Fix Vanes Type Wet Scrubber System {Before ID) b. Application Boiler Exhaust 40 TPH - 1 Nos. c. System Air/Gas Volume- As per boiler specifications. d. Boiler Air Heater Outlet Flue Gas Temp. Considered· 180°C to 200°C e. Systems Components

1. Ducting Components (Inter connecting Air Heater outlet to scrubber inlet and scrubber outlet to ID fan inlet and Fan outlet to second opening of Chimney with Required ducting, Dampers, expansion below & inlet cone).

2. Fix Vanes Type Wet Scrubber System (Before ID) unit complete assembly 3. 10 Fan with ali accessories with suitable Motor.

Wet Scrubber Specifications:

a. b. c. d. e. f. g. h. i.

Type of System- Fix Vanes Type Wet Scrubber System (Before ID) with bypass arrangement. Application- Flue Gas Cleaning Scrubber Air Volume • As per boiler specifications Air Heater Outlet Flue Gas Temp. -180°C Required Stack Temp- 90 °C (±10°C). Scrubbing media· Water Water Pump with motor- As per Design. Water Re-circulation Tank- 1 No - As per boiler speclflcatlons. Efficiency 100% (<50 mg/Nm3 Dust Concentration after Scrubber)

~~ Page l of4 ~

292

j.

k.

Unit Components (Acces~ories)- Fix Vanes Type Wet Scrubber System (Before ID) Scrubber, Duct ,By pass arrangement Cyclon1c Separator, Pumps with motor with spray nozzle, Piping, ball valve, support structure and all related accessories etc. with modified capacity ID fan with motor (If Possible). slurry traveling scrubber to ash pit by gravity with slurry drainage and ash pit.

Scope Of Work:

a. Dismantling work of Existing ID fan, casing, ducting etc. required for installation of wet scrubber system Is in your scope.

b. Design, Manufacture, Supply, Erection & Commissioning of Fix Vanes Type Wet Scrubber System ( Before ID) along with all accessories.

c. The Fix Vanes Type Wet Scrubber System ( Before ID) need to be individual for each boiler compulsory. d. efforts shall be made to retain the same power consumption using existing motors- if possible. e. Supply, Fabrication, Errection, commissioning &trial of new ID fan assembly consisting with Impeller, casing of

fan, Expantion Bellow, Inlet cone, Inlet ducting, outlet ducting, Damper, Shaft, Bearing, Sleeve, Pedestal, fan pulley, motor pulley, V Belt, suitable Motor(if possible existing motor can be utilize),Power cabling, Starter (existing shall be used) ,Water supply Pumps with motor, Make up pump with motor Control cabling, Electrical panel, Hood, Bend, Flanges, Hardware, Nut & bolt, internal SS309 piping, SS flange & SS bends, Gascate, Pressure Gauge, Hose Pipe Structure, ladder, support, C Class Pipe, Valve -150 Class, Pulley Guard.

f. All required & necessary changes in supplier's scope. g. Required modification In nue gas ductlng from APH outlet to wet scrubber inlet and outlet from scrubber to ID

fan & than to second opening of chimney along with required leak proof dampers. h. ID fan no. 03 to scrubber outlet dueling Is connected to second opening of chimney. I. By pass Arrangement system Is compulsory for all boilers with required dampers. j. All Drawing should be approved by our consultant (VSI, Manjarl, Pune) compulsory. All drawings should be

submitted in three copies. k. You will be responsible if the relevant system has adversely affected the boiler operation as per your design. If

this is found or crushing Is affected legal action will be taken against you as per Co-operative rules & regulation. I. All civil work and foundation work will be carried out Karkhana as per your drawing. m. All Ducting MS anticorrosive painted. n. ID fan Is type of backward curve high efficiency. o. Supply of Fix Vanes Type Wet Scrubber System (Before ID) with complete assembly with required

structure, ladder plat form, railing, supports, man hole & stair case for 40TPH boiler wet scrubber system.

Scope Of Supoly:

a. Design preparation of layout drawing of Fix Vanes Type Wet Scrubber System (Before ID) unit complete assembly for 40TPH boilers - Before ID fan & got approved by V.S.I. Manjari, Pune.

b. Supply new ID fan impeller, casing of fan, Expantion Bellow, Inlet Cone, Inlet ducting, outlet dueling, Damper, Shaft, Bearing, Sleeve, Pedestal, fan pulley, motor pulley, V Belt, suitable Motor, Power cabling, Starter, Water supply Pumps with motor, Make up pump with motor Control cabling, Electrical panel, Hood, Bend, Flanges, Hardware, Nut & bolt, Gascate, Pressure Gauge, Hose Pipe Structure, stair case ladder, support, C Oass Pipe, Valve -150

c. Ducting from APH outlet to wet scrubber Inlet and outlet from scrubber to lD fan & than to chimney with bypass arrangement. Fan motor suitable for fan capacity. (Existing can be used if possible).

d. Supply of scrubber unit with required accessories suitable to boiler details & internal SS 304 piping flanges, Hardware, gasket, pressure gauge, etc.

e. All types of power cable, motor, starter, pumps, control cable, electrical panel & sensors, exhaust air duct after fan outlet to chimney.

f. Required motor power cable from our power house to motor starter & from starter to motor is in your scope. Required all foundation bolts in supplier scope. (If possible existing can be used)

g. Supply of Fix Vanes Type Wet Scrubber System (Before ID) with complete assembly with required structure, ladder plat form, railing, supports, man hole & stair case for 40TPH boiler wet scrubber system.

Reqyjred Technical Specification;

a. exhaust Emission level not less than 50mg/NM3 and effectively arrest 100% particulars of size of 10 micron as per MPCBICPCBICo-Operative norms.

b. Size of scrubber as per your design. c. draft loss across system below 100±20mmwc. d. Fix Vanes Type Wet Scrubber System (Before ID) & cyclonic separator must be SS 304 I 409 lining. e. metallurgy certificate class of piping make all related certificate to be submitted. f. spray nozzle & Internal piping & fitting SS material compulsory. g. all drawing should be approved by consultant (VSI compulsory) h. 10 fan RPM should be suitably design to meet scrubber efficiency. i. all piping should be C class compulsory. j. water circulation tank. k. wet scrubber efficiency not less than 95% I. 10 fan type backward curve I simply I overhang supported.

Page 2 of 4

293

SPECIFICATIONS OF THE EOUIPMENTS

Material of Specifications Sr. No . Type construction Type of Scrubber (Fly ash Fix Vanes Type Wet Scrubber

1. arrester) System (Before ID)

~crubber with external stiffeners. ~mm thick of MS Stiffeners. lfhe velocity of flue gas not to

2. ~xceed more than 2.6M/Sec. !SUpport structure platform Self-supporting structure for

F'upports, structure rail ing stairs etc. !scrubber to be provided from

3. SMB: 250, Base Plate: 600mm RCC foundation above '0mm Bracket: 12mm FFL.

MS chequrred plate 6mm MS chequrred plate all around scrubber for working &

4. Platform, railing & ladder vertical bracket SOxlOO maintenance with railing &

Horizontal 50x50 ladder.

5. ntrainment separators (Mis

lmm thick SS 304 ~hevron Demister !eliminator)

!Velocity of flue gas not to

6. ~onnecting Flue ducts inlet 8 ~mm thick MS plate.

jexceed 12 M/Sec. Terminal putlet of scrubber. from Air heater out let to

himney inlet

7. ~lear water recirculation pumps Hi-chrome body and !Already mentioned in 2X20TPH 1mpeller with EN 8 Shaft !scrubber Work order

8. !Manhole 16oomm dia For cleaning/inspection

Ist coat of zinc chromate on lfhe entire system shall be painted with Ist coat of primer

9. Primer & paint finish jscrubber & structure & lind I& lind coat of silver/grey paint oat heat resistance !aluminum Silver/grey paint

before commissioning/handing lover of system.

Specification & Make of Component:

a. impeller (fan) bottliboy I flake /CB Doctor b. electrical motor- kirloskar I ABB/ Siemens c. bearing - SKF / FAG d. power control & cable- Polycab I Finolex d. starters- L & T I Siemens e. water pump with motor (0 Body with SS impeller & ENS shaft) - kirloskar I Sam Turbo I Vikash. f. pressure gauge - Tiwac I Forbes Marshall g. MS material Make & Quality - SAIL 1 TATA 1 Jindal 1 Grade: IS2062 E20250A I All MS Material Size 6mm & Smm h. Spray Nozzle& Internal piping- ss 304 I. Piping- C-class & valve (Casing) 150 Class Make Kirloskar I Thorat j. Design preparation of layout drawing of Fix Vanes Type Wet Scru bber System (Before ID) unit complete

assembly for 40TPH boilers - Before ID fan & Got approved by V.S.l. Manjari, Pune.

Performance Parameter:

a. Outlet emission Level - <50mg/Nm3 for particle above 10 micron. b. Pressure drop across scrubber - lOOmmwc. (±20mmwc) c. Outlet flue gas temperature - 90°C (±10°C) d. supplier will be give guarantee & warrantee with continuous with two crushing season with next off-season for

free maintenance against any manufacturing defect.

Terms & Conditions:-

1. Welding machines, gas set electrodes (Advani super bond/ lSI certificate I Equivalent) only & consumables will be arranged by party.

2. Any accident I Injury during dismantling & fitting of branch pipe connections to your workers will be your responsibility.

3. Karkhana will provide lodging facility to your site engineer one person only & simple accommodation for other workers.

4. You will have to attend any other work related to Design, Supply, Fabrication, Erection, Commissioning work, empty &performance trial of Fix Vanes Type Wet Scrubber System ( Before ID) complete assembly.

5. All civil foundation work is to be done by Karkhana. All civil work & dvil foundation drawing to be submitted within 4 days after signing agreement.

6. Karkhana will provide cutting gas for fabrication work on chargeable basis as per availability at store. 7. Complete Design, Supply, Erection, Commissioning work to be completed in stipulated period. 8. Complete job work to be done at Karkhana site.

9. Performance guarantee for workman ship & trouble free operation should be given for two crushing seasons. 10. Fan static pressure, Fan RPM & motor rating to be submitted. 11. You have to submit final data sheet, performance curve, fan characteristics, GA drawing & GO calculations. 12. System should be design so that gases velocity should be maintain as per requirements.

Page 3 of 4

294

13. Please note that complete job is on Turn Key basis FOR Bhavaninagar. • 14.

Excise Duty: Excise against submission of Excise documents "S" invoice along with the supply of material for getting us modvat I cenvat benefit failing which the modvat /cenvat amount will be debited to your account & recovered from you. Tax as applicable. Please indicate your PAN CARD number on your bill. Job Work Completion Per iod 60 DAYS WITH after handover our civi l foundat ion work.

Terms of Payment :-

1) Price Rs. 80,00,000/-2) Taxes GST Extra as applicable. 3) Payment Terms A] 15% Advance with Work Order & Agreement.

B] 10% After submission & approval of the All Design & Drawings. C] 65% After Receipt &approval of Material at factory site as per Billing

Break-Up (BBU) D) 10% Retention after successfully completion of one crushing season

against performance guarantee of next one crushing season.

Thanking you,

Copy to:

Yours faithfully

~ (A. B. Jalft(c(v'}

Managing Director Shri Chhatrapati S.S. K. Ltd. Bhavaninagar,

Tal: lndapur, Dist: Pune

I L-(P~at~

CHAIRMAN Shn Chhatrapatl S.S. K. Ltd. Bhavaninagar,

Tal: Indapur, Dist: Pune

1) Purchase with P. C., 2) Store, 3) Accts., 4) Gen. Office, 5) Engg. Dept., 6) Mfg.

Page 4 of 4

295

• 'IMUII\11\IR q~ :

_., '"~'" '"",. '"'"' ~ ••Ut~ "''',_. omr I • ' ttC:- "-H'\' 1fT. ~arw.f 15Tlrtn I '\ \ '"~ ft.~. II>Tlri. I '"'~'' ~ "\' H

Cfqloftifil(. m. tc:m. ~. ~ .. 1181'(1"* ~ (111'rn'} 'fl:raf 'ZIST!r ~~~~0"

~~:

~lf$Zl~

~qm:

Shli Chbatrapatl S.. S. K. Ltd ..

1'~ tjin;t"ji(q( (s1t) BHAVANIN.AGAR. TAL. INDAPUR, DIST. PUNE PIN CODE 413104 " MAHARASHTRA (INDIA)

;;rn'if; ~ql'fi : / SCSSK/ENGG/ I 1'3& /2021-22

To,

PURCHASE ORDER

M/s. Enviropol Engi neers Pvt. ltd., A-50, Sector-65, Industrial Area, PH-lll, Noida-201307 (Uttar Pradesh)

f~ : 2 /~ / 2021

Sub: Design, Manufacture, Supply, Erection & Commissioning of Fix Vanes Type Wet Scrubber System (Before ID) Complete In All Respect with Accessories, By Pass System and new Id fan Assembly Etc.

Dear Sir With reference to above cited subject, we refer to the quotation and discussion with your representative in our

purchase committee meeting held on Dtd. 16/ 07/ 2021 & further discussion in Our Hon. Board of Directors Meeting Held on Dtd. 29/07/2021 we are pleased to place our firm work order for to supply, erection & commissioning of Fix Vanes Type Wet Scrubber System (Before ID) for maintain CPCB f MPCB norms. The details are as under.

Our Boiler Details:

Make Reg. No. Capacity Working Temp Air Heater Flue Gas Fuel Type Pr. outlet Flue Volume.

gas temp. ISGEC MR-9212 20T/ Hr. 21 320"C 180°C 100800 Baggase with

Kg/cm2 m3/hr SO% Moisture ISGEC MR-9206 20 T / Hr. 21 320"C 180"C 100800 Baggase with

Kg/cm2 m3/hr SO% Moisture Chimney Heiqht- 60 Mtr & Chimney ID - 04 Mtr

Fix Vanes Type Wet Scrubber System (Before ID) fan should be design for fly-ash arresting with guaranteed performance of Exhaust Emission level not exceeding SO mg/ NM3 & effectively arrests 100% particles of sizes up to 10 micron as per Central /State Pollution Control board latest amendments and Norms.

Svstem Data:

a. Type of System- Fix Vanes Type Wet Scrubber System (Before ID) b. Application Boiler Exhaust 20 TPH - 2 Nos. c. System Air/Gas Volume- As per boiler specifications. d. Boiler Air Heater Outlet Flue Gas Temp. Considered- 180°C to 200°C e. Systems Components

1. Ducting Components (Interconnecting air heater outlet to scrubber inlet and scrubber outlet to ID fan inlet and Fan outlet to Chimney with Required ducting, Dampers, expansion below & inlet cone)

2. Fix Vanes Type Wet Scrubber System (Before I D) unit complete assembly 3. ID Fan with all accessories & with suitable Motor.

Wet Scrubber Specifications:

a. Type of System- Fix Vanes Type Wet Scrubber System (Before ID) Unit individual to each boiler with bypass arrangement.

b. Application- Flue Gas Cleaning c. Scrubber Air Volume - As per boiler specifications d. Air Heater Outlet Flue Gas Temp. -180°C e. Required Stack Temp- 90 oc (±10°C}. f. Scrubbing media- Water g. Water Pump with motor- As per Design.

Page 1 of4

296

Water Re-circulation Tank- 1 No - As per boiler specifications. Efficiency 100% (<50 mg/Nm3 Dust Concentration after Scrubber)

h. i. j. Unit Components (Accessories)- Scrubber, Duct ,By pass arrangement Cyclonic Separator, Pumps with motor

with spray nozzle, Piping, ball valve, support structure and all related accessories etc. with modified capacity ID fan with motor.

k. slurry traveling scrubber to ash pit by gravity with slurry drainage and ash pit.

Scope Of Work:

a. Dismantling work of Existing 10 fan impeller, casing, ducting etc. required for installation of wet scrubber system is in your scope.

b. Design, Manufacture, Supply, Erection & Commissioning of Fix Vanes Type Wet Scrubber System (Before ID) along with all accessories for two boilers.

c. The Fix Vanes Type Wet Scrubber System (Before ID) need to be individual for each boiler compulsory. d. efforts shall be made to retain the same power consumption using existing motors- if possible. e. Supply, Fabrication, Errection, commissioning &trial of new ID fan assembly consisting with, casing of fan,

Expantion Bellow, inlet cone, Inlet ducting, outlet ducting, Damper, Shaft, Bearing, Sleeve, Pedestal, fan pulley, motor pulley, V Belt, suitable Motor(if possible existing motor can be utilize),Power cabling, Starter (existing shall be used) ,Water supply Pumps with motor, Make up pump with motor Control cabling, Electrical panel, Hood, Bend, Flanges, Hardware, Nut & bolt, internal SS309 piping, SS flange & SS bends, Gascate, Pressure Gauge, Hose Pipe Structure, ladder, support, C Class Pipe, Valve -150 Class, Pulley Guard.

f. All required & necessary changes in supplier's scope. g. Required modification in flue gas ducting from APH outlet to wet scrubber inlet and outlet from scrubber to ID

fan & than to chimney along with required leak proof dampers. h. ID fan no. 01 & 02 Scrubber outlet ducting is to be commonly connected to existing location of chimney i. By pass Arrangement system is compulsory for all boilers with required dampers. j. All Drawing should be approved by our consultant (VSI, Manjari, Pune) compulsory. All drawings should be

submitted in three copies. k. You will be responsible if t he relevant system has adversely affected the boiler operation as per your design. If

this is found or crushing is affected legal action will be taken against you as per Co-operative rules & regulation. I. All civil work and foundation work will be carried out Karkhana as per your drawing. m. All Ducting MS anticorrosive painted. n. ID fan is type of backward curve high efficiency. o. Supply of Fix Vanes Type Wet Scrubber System (Before ID) with complete assembly with required structure,

ladder plat form, railing, supports, man hole & stair case for 20TPH X 2 Nos. boilers wet scrubber system.

Scope of Supply:

a. Design preparation of layout drawing of Fix Vanes Type Wet Scrubber System (Before ID) unit complete assembly for two boilers - Before 10 fan & got approved by V.S.I. Manjari, Pune.

b. Supply new ID fan impeller, casing of fan, Expantion Bellow, Inlet Cone, Inlet ducting, outlet ducting, Damper, Shaft, Bearing, Sleeve, Pedestal, fan pulley, motor pulley, V Belt, suitable Motor, Power cabling, Starter, Water supply Pumps with motor, Make up pump with motor Control cabling, Electrical panel, Hood, Bend, Ranges, Hardware, Nut & bolt, Gascate, Pressure Gauge, Hose Pipe Structure, stair case ladder, support, C Class Pipe, Valve -150

c. Ducting from APH outlet to wet scrubber inlet and outlet from scrubber to ID fan & than to Chimney with bypass arrangement. Fan motor- suitable for fan capacity (existing shall be used) if possible.

d. Supply of scrubber unit with required accessories suitable to boiler details & internal SS 304 piping flanges, hardware, gasket, pressure gauge, etc.

e. All types of power cable, motor, starter, pumps, control cable, electrical panel & sensors, exhaust air duct after fan outlet to chimney.

f. Required motor power cable from our power house to motor starter & from starter to motor is in your scope. Required all foundation bolts In supplier scope. (if possible existing shall be used)

g. Supply of Fix Vanes Type Wet Scrubber System (Before ID) with complete assembly with required structure, ladder plat form, railing, supports, man hole & stair case for 20TPH X 2 Nos. boilers wet scrubber system.

Required Technical Specification;

a.

b. c. d.

e. f. g. h. i. j. k. I.

exhaust Emission level not less than 50mgiNM3 and effectively arrest 100% particulars of size of 10 micron as per MPCBICPCBICo-Operative norms. Size of scrubber as per your design. draft loss across system below 100±20mmwc. Fix Vanes Type Wet Scrubber System (Before ID) & Cyclonic separator must be SS 304 1 409 lining wherever required. metallurgy certificate class of piping make all related certificate to be submitted. spray nozzle & internal piping & fitting SS material compulsory. all drawing should be approved by consultant {VSI compulsory) ID fan RPM should be suitably design to meet scrubber efficiency. all piping should be C class compulsory. water circulation tank. wet scrubber efficiency not less than 95% ID fan type backward curve I simply 1 overhang supported.

Page 2 of4

297

SPECIFICATIONS OF THE EOUIPMENTS

Material of Specificat.ions Sr. No. Type construction fType of Scrubber {Fly as~ Fix Vanes Type Wet Scrubber

1. !arrester) Svstem (Before ID)

!Scrubber with external stiffeners. ~mm thick of MS Stiffeners. h-he velocity of flue gas not to

2. ~ceed more than 2.6 M/Sec. ~upport structure platform !Self-supporting structure for

3. !Supports, structure ailing stairs etc. ~crubber to be provided from SMB :250, Base Plate: ~OOmm RCC foundation above ~Omm Bracket: 12mm FL.

MS chequrred plate 6mm MS chequrred plate all around scrubber for working &

4. Platform, railing & ladder !vertical bracket SOxlOO maintenance with railing & Horizontal SOxSO

ladder.

5. ntrainment separators (Mist

1mm thick SS 304 jchevron Demister !eliminator)

tv'elocity of flue gas not to

6. ~nnect.ing Flue ducts inlet 8

j6mm thick MS plate. !exceed 12-18 M/Sec. Terminal

~utlet of scrubber. from Air heater out let to lrhimney inlet For all three scrubber Common

~i-chrome body and ~ nos. pumps with motor,

7. jclear water recirculation pumps ~tarter, cable etc. of suitable Impeller with EN 8 Shaft

Plpacity & head( one as tandbv)

8. ~an hole ~OOmm dia or cleaning/inspection

st coat of zinc chromate on The entire system shall be painted with Ist coat of primer

9. Primer & paint finish ~crubber & structure & lind

& lind coat of silver/grey paint oat heat resistance

!aluminium Silver/grey paint before commissioning/handing over of svstem.

Specification & Make of Component:

a. impeller (fan) bottliboy I flake I CB Doctor b. electrical motor- kirloskar I ABB/ Siemens c. bearing - SKF / FAG d. power control & cable - Polycab I Finolex d. starters - L & T I Siemens e. water pump with motor (0 Body with SS impeller & ENS shaft) - kirloskar/ Sam Turbo I Vikash f. pressure gauge - Tiwac I Forbes Marshall g. MS material Make & Quality - SAIL I TATA I Jindal I Grade: IS2062 E20250A I Ali MS Material Size 6mm & 8mm h. Spray Nozzle& Internal piping - SS 304 i. Piping - C-dass & valve (casing) 150 Class Make Kirloskar / Thorat j. Design preparation of layout drawing of Fix Vanes Type Wet Scrubber System (Before ID) unit complete

assembly for two boilers - Before ID fan & Got approved by V.S.I. Manjari, Pune.

Performance Parameter :

a. Outlet emission Level - <50mg/Nm3 for particle above 10 micron. b. Pressure drop across scrubber - 100mmwc. ( ±20mmwc) c. Outlet flue gas temperature- 90°C (±10°C) d. supplier will be give guarantee & warrantee with continuous with two crushing season with next off-season for

free maintenance against any manufacturing defect.

Terms & Conditions:-

1. Welding machines, gas set electrodes (Advani super bond/ ISI certificate I Equivalent) only & consumables will be arranged by party.

2. Any accident I injury during dismantling & fitting of branch pipe connections to your workers will be your responsibility.

3. Karkhana will provide lodging facility to your site engineer one person only & simple accommodation for other workers.

4. You will have to attend any other work related to Design, Supply, Fabrication, Erection, Commissioning work, empty & performance trial of Fix Vanes Type Wet Scrubber System (Before ID) Unit complete assembly.

5. Ali civil foundation work is to be done by Karkhana. All civil work & civil foundation drawing to be submitted within 4 days after signing agreement.

6. Karkhana will provide cutting gas for fabrication work on chargeable basis as per availability at store. 7. Complete Design, Supply, Erection, Commissioning work to be completed In stipulated period. 8. Complete job work to be done at Karkhana site. 9. Performance guarantee for workman ship & trouble free operation should be given for two crushing seasons.

Page 3 of4

298

10. Fan Capacity, static pressure, Fan RPM & motor rating to be submitted. 11. You have to submit final data sheet, performance curve, fan characteristics, GA drawing & GO calculations. 12. System should be design so that gases velocity should be maintain as per requirements. 13. Please note that complete job is on Turn Key basis FOR Bhavaninagar. 14.

Excise Duty: Excise against submission of Excise documents "S" invoice along with the supply of material for getting us modvat 1 cenvat benefit failing which the modvat 1 cenvat amount will be debited to your account & recovered from you. Tax as applicable. Please indicate your PAN CARD number on your bill. Job Work Completion Period -60 Days with after hand over our civil foundation work.

Terms of Payment :-

1) Price 2) Taxes

Rs. 1, 20,00,0001-GST Extra as applicable.

3) Payment Terms A] 15% Advance with Work Order & Agreement. B) 10% After submission & approval of the All Design & Drawings. C) 65% After Receipt &approval of Material at factory site as per Billing

Break-Up (BBU) D) 10% Retention after successfully completion of one crushing season

against performance guarantee of next one crushing season.

Thanking you,

Copy to:

Yours faithfully

~ (A.B.~) Managing Director

Shri Chhatrapati S.S. K. Ltd. Bhavaninagar, Tal: Indapur, Dist: Pune

Shri <l'lhatrapati S.S. K. Ud. Bhavanlnagar, Tal: Indapur, Dist: Pune

1) Purchase with P. C., 2) Store, 3) Accts., 4) Gen. Office, 5) Engg. Dept., 6) Mfg.

Page 4 of4

299

300

301

T.C.

302

Ax. R6

T.C.

() 2017 ()

~N" 0 ~~ 0 Jf1* ~ 'RtJJ.t.;'\ ~t!>fLfdl ~L w.:r . . '

~ <1 o·i'\'5\ ';>' ~ I 4q~ "-'

~~ · ' 6"\~~1(1 ~ dl "

qz ,- - ~~...,~~ (11'--

~--~---·--·--- • i \ ·~ .

'i · ... · \ l:'\. ;,., • ~ r ,' ~ ', - ~

'q'('<fl -t!~: • •. ; 1 ... -; . • :;.. ... ..,, z:; 0~

~ ~ 'fl ~<li l fl ~ <li iH!I I"'I

ll€.\1~1~ fltF!'llfl CflTllGT 9~~o 3Rf4 '{~. lJ.-q-1. 'lFl141'1ll'<, 'ill . ~. ftr. ~. ~9~9o~ ~- cWtifl l {l {1 ill C1 ifl

~ ll1ffiG ~ 3RT'ffi cn:r qq:_ ~f.. t.Rr-~. xT. ~. 'ill. ~. ftr. ~

mtft ...

SL 162490

303

9)

~)

~)

~) ~Rlt ~- 6"f, m ?fim~ _ cm-J .P6 _q-q, ~-~ "7licr- "ffURR,

<re .~~ fJ~I i . ~-____)(__~ 7()'1/IZ - ; "'" ..

~ I " •

"' ~ J .. ' '•

~) /.- ~!f:fr-iJ~n,- C!f/jzc?JOlt4 ~~~ ~- tm--:Y:'f-CTil· ~-~~7rfq- "ffURR,

' 'TC ~- Los ern- X'3~.3D~-

f.) ·~r:rr~M. 6'.&-"?. -<?#~ q<:f-~:;2._~' ·~-M ."7licr- fl'ORR,

l9)

'TC ~- 1..:~ t.p/Cj ~-_L~ ?C"1i!Z.

~ \11R~ ~ W?{t[Rf ~1541141 "f1'RR 411'Hsll11 ~-. 'liCII ·ft1 11'<, "ffi. ~. ftr. ~. ~ 'Cnff \3(ql<:;¢ ~ 41'<1'<-11'11 ~ ~ 'ffi 'Ell<>ft~S'I'ilu)

9) crx ~ ~ $1m m llt51'< 1 ~ x~T-n cnnro 9~~o ~ ~JGfltR mffi;rr c:r '1)zyft ~ ~itFf? l {) 471'<>ml11 ~. ~ ~ 4>1'<>mlil ~ ahmfu:T ~ c:r fcllR ~=f'lm=tc:i=cu 'Cnff •1<J1c11'<1 ~ "<1reR cr ~ \1tl'tlGT2l \iRl ~ ~ ~ ~ q­

~ M' ~ UlcHilq ~-

304

w~i1iit~~~~~~!~

t~i~~ t~

l~ 111 ~t~"il1i~~

~~ t;~~~ !i

·~~ ~I

~ r~ ~~ ~~ ~~ :!~~~~

h ~~i r~ ~ w

1

~l~i~!~~!Ju~~.w lt!u ti f®

-~· ~

Eil(i1J1 ~J11 ~~~~-~~~

11 ~~

i I j h ! 1 t 1 ! ~ • r ~; ~ i! ~ ·~

1 ! _,

_ . \ ~ Ji _

~~ ·~ &'

~ i~"'

'""''-ii ~

"'"~ ~

~

! ~: Iii~~ ! ~~ t .

I " r t

~1

~ ~'" · ~ ~&"' wii~i~J . f!i~~=~~ ~ N

~1>~ 11r~~~~~~!ii! f;llti~ti ~~~ ~ ~ i ~

~ ~ii

~ i ' (Y

~

~ '?

~~!!

.. • -•

;•

......-.. .....-...

.....-.. .,.-.....

fT

C"Y ('f)'

305

Translated on google Translator

Agreement

Dated :-22/09/2017

Shri Chhatrapati Sahakari Sugar Factory

Established under Maharashtra Co-operative Act 1960,

At/Po :Bhavaninagar, Tal. Indapur, Dist. Pune, 413104

On behalf of - Executive Director

Shri Govind Mahadeo Anarse Promisor

Age : 56, Occupation - Service,

At/p :Bhavaninagar, Tal. Indapur, Dist. Pune

Yansi ...

1) Mr / Mrs.Ranjit Baburao Nimbalkar

Age - 43 years, Occupation – farmer, Village- Sansar,

GAT No. : 713 Area : 09 Acres

2)Mr / Mrs.Ramdas Vasantrao Nimbalkar

Age :- 56 years, Occupation – farmer, Village- Sansar,

GAT No. :-488 Area :- 2.20 Acres

3) Mr / Mrs. Sumit Rameshrao Nimbalkar

Age :-28 years, Occupation – farmer, Village- Sansar,

No. :-618 Area :- 05 Acres

4) Mr / Mrs. Baban Namdeo Kalbhor

Age :-70 years, Occupation – farmer, Village- Sansar,

GAT No. :-837/1 Area :- 04 Acres & 10 R

5) Mr / Mrs. Houserao Wamanrao Nimbalkar

Age :-55 years, Occupation – farmer, Village- Sansar, Promisee

GAT No. :-803 Area :- 43 Acres &30 R

6) Mr / Mrs. Prashant Baban Kalbhor

Age :-42 years, Occupation – farmer, Village- Sansar,

GAT No. :- 837/1 Area :- 08 Acres& 20 R

7) Mr / Mrs. Chandrakala Sampatrao Nimbalkar

Age :-68 years, Occupation – farmer, Village- Sansar,

GAT No. :-844 Area :- 01 Acres

8) Mr / Smt. Hemlata Baburao Nimbalkar

Age :-67 years, Occupation – farmer, Village- Sansar,

GAT No. :-713 Area :- 08 Acres

306Translation of Page 303 to 305

We have the above Shri Chhatrapati Sahakari Sugar Factory Ltd., Bhawaninagar, Tal. Indapur,

Dist. Pune the Sugarcane Producer Member writes the agreement as follows:

1) It is a co-operative factory established and registered under the Maharashtra Co-operative

Societies Act, 1960. This sugar factory manufacturing the sugar and By-products like electricity

by using the sugarcane from its member and non-members from their area.

2) We writing this agreement are members / non-members of this factory and we belong from

above mentioned village and gut which is close to factory area. This area is owned by us and

we are growing crops over there. We need water for these crops and the factory that produces

some amount of wastewater during the production process. The generated effluent is treated

by the factory and disposed of properly. Since our farm area is adjacent to the factory as

mentioned above, the treated wastewater flows through the stream flowing around our area

and the crops we grow are also in dire need of water and the factory disposes of it.

This treated waste water is indirectly beneficiary for our crops. Therefore, we Promisee and

promisor made this agreement with mutual understanding. We requested to factory to provide

this treated water to us and also, we requested factory to provide this with factory expenses

and factory accepted the same. We do not have any complaint or objection. We are ready to

use this treated water for further eleven years.

3) There will be coordination between the factory and us for disposal of treated water. We are

writing and signing the agreement to ensure that the above-mentioned areas belong to us and

therefore we are writing this agreement. In case of any alterations, we will notify the factory in

writing and such alterations will be binding on the new holder.

4) This Agreement without any hesitation and without any hesitation and we have signed this

Agreement stating that this Agreement is fully acceptable to us. For any dispute we will sort it

out with mutual understanding.

5) The agreement is written in accordance with the guidelines of the Maharashtra Pollution Control

Board. So it is binding on both.

The factory has paid all the expenses of this agreement.

The deal is done as it comes.

Place - Bhavaninagar Promisor

Date - 22 /09 / 2021

(Managing Director)

Shri Chhatrapati S.S.K.

Ltd.,Bhavaninagar

Signature:

1) 5)

2) 6)

3) 7)

4) 8)

Witness:

1)

2)

307

T.C.

'"lt11\J~ MAHARASHTRA () 2020 ()

I

I

I

I

' I I

a

.,ft ~ '<1~¢1'fl ~ ¢1'WIHI

1181'!1~ fl8¢1xl cm<:rGT 9~~o ~ '{~. lJ.tiT. 'l'ICII;:ft•p l'!, 'ill.~. R;r. ~. ~9~9ob' qq;_ 4>14¢1{1 fi:q I &14>

.,ft ~ ~ 3Rl'ffl Cflf 'CI'tl- '1~. $IT-~. "!1 . ~NI1l1'1'<, 'ill.~. R;r, ~

~ ...

XD 405 134

308

..:

q) ~rm J.o1n?n ilri&J~q /#~tcot?.N. ~- ~~~ ~. ~-~l'licr- "fflJTffi,

lfC mJJ1-o, ~~ ~~'~-_i (ft¥J.t

~) ~pjr. til{,t:tl',t( 6fltj,t(l'f t~dlldJ¢(

~- ~' Cf'll. ~- .t2171 l'licr- "ffUT"fR.

lfC m-/i2~. uu= $-_5/g_t? ~tb(

~) ~Ri HI'Jtv! l(lf;/i'/J J'fpJ/JJaJ~

~- "" Cf'll. ~~)~~~- "ffUT"fR,

lfC m - ~'. fit~--~- I. om-< , 0 • ". •

~) ~tm "-J. ~ ::I"t?/ <:fy rz<lll /f"!&~tMa:J<

~)

G)

19)

~-!tO ~. ~~ "fl'11ffiX,

..ttRftl() c!9t1 <)1,~ ,iJR,~ ~- 3' ~. ~- . l'licr- "ffUT"fR,

lfC ~-_£_1_(___~- '~ C/"' c,...

~l~ • i ....c• I Eilfl tf ~ rrr 1/J 51 I t~R'-'--ttt'J_,_~----..~

~- )(o ~. ~- .tlnf'= l'licr- "ffUT"fR,

lfC -;f<R- £.t.£. ~- (D {/.-r'( ,...

~Rfi--·-----~-·--~. ~-_ _ "Tftq-~.

lfC -;f<R- ~-----

~---~. ~-· _ _ l'licr- "fflJTffi,

lfCm- ~----

9) CR ~ ~ tlurR ~ J161'<1~ 'H6<Pifl '¢l!TGT 9~f.o 3RT<i ~ ~ q 1lGuft ~ tl6¢1;ft ¢1'<'&111 3Rfl', ~ ~ ¢1'<~111 ~ ~ ~ q ~ ~'SJ i fl~jijJ ~ llci){1J{l ~ ~ q ~ ~ 'V1'Xl '<tf ~ ~ Cf)'I(U4J iJJ q ~ fcrslft &>xu)iJI C£1 cHi lll 3l%.

309

·~i ·i~l ~-~ N. 1 ~~ n:

u·~~'f ~ ~ ~

~\ .~ 1 ~t~-n~ ,.~

"fiO if~ . ~;i ~~ f!

-~ i

~~~-~~~~ ~~~!~:t l!!li tt

i l ~

r-p ~ ~ f ~

-m ~ ~ l ~ ~ ~ I Jrt ~ ~ -w

~ . cs

s i~h~f.;:

~;;~~Ri~ ~f~~hf~

~~it, ~~

_} ~

~ '1:: [ -~

i -~ \. ~ i

/~ ·-

~ ! -t ,.~ ;: -~ ~ ~ ~

i i Jr~ ~ ~ ~ ~ ~ ' ~ ~ ffi ~ ~

~~ i .W

~ ~~ ~ L

. --

~ i "" t~g ~ ~ ! h i'. ~ H

!J'~ ~ ,. ~

-~<!!' ~~ ~ -

u -

~~.ct~~ ~~.,~~<lrt Jilt~l~t• !l ~

r;; _\\,~

1 -m i i ~

~ ; ~ ~ i ~ t l ! ,. .!'; ;,i f ~ .II ! ~ ! .

-§ ~ -~~ i

! 1!! i 1"" I ~ i: j I] ~ -~ 1 1 i ~ i! ~ I ! 1 { i ~

(~ ~ :~ 2~ i1!i1 !li ft:!il! f;! ;! ; !li !! ~ ! i -

! 't ~ ~-- ('Y

........... rn-

........... -

:>o :r

310

Translated on google Translator

Agreement

Dated : 28/02/2021

Shri Chhatrapati Sahakari Sugar Factory

Established under Maharashtra Co-operative Act 1960,

At/Po :Bhavaninagar, Tal. Indapur, Dist. Pune, 413104

On behalf of – Managing Director

Shri. Govind Mahadev Anarse Promisor

Age : 56 yrs, Occupation - Service,

At/p : Bhavaninagar, Tal. Indapur, Dist. Pune

To...

1) Mr / Mrs. Ranjit Baburao Nimbalkar

Age – 44 years, Occupation – farmer, Village- Sansar,

GAT No. : 720/717 /713 Area : 09 Acres

2) Mr / Mrs. Subir Baburao Nimbalkar

Age :- 41 years, Occupation – farmer, Village- Sansar,

GAT No. :-712/714 Area :- 8.20 Acres

3) Mr / Mrs.Manisha Ranjit Nimbalkar

Age :-39 years, Occupation – House-wife, Village- Sansar,

GAT No. :-711/713 Area :- 02 Acres Promisee

4) Mr / Mrs. Chandrakala Sampatrao Nimbalkar

Age :-70 years, Occupation – House wife, Village- Sansar,

GAT No. :-844 Area :- 04 Acres

5) Mr / Mrs. Rohit Ramesh Nimbalkar

Age :-31 years, Occupation – farmer, Village- Sansar,

GAT No. :-618 Area :- 12 Acres

6) Mr / Mrs. Santosh Dattatray Nimbalkar

Age :-40 years, Occupation – farmer, Village- Sansar,

GAT No. :-626 Area :- 07 Acres

We have the above Shri Chhatrapati Sahakari Sugar Factory Ltd., Bhawaninagar, Tal. Indapur,

Dist. Pune the Sugarcane Producer Member writes the agreement as follows:

311Translation of Page 308 to 310

1) It is a co-operative factory established and registered under the Maharashtra Co-operative

Societies Act, 1960. This sugar factory manufacturing the sugar and By-products like electricity

by using the sugarcane from its member and non-members from their area.

2) We writing this agreement are members / non-members of this factory and we belong from

above mentioned village and gut which is close to factory area. This area is owned by us and

we are growing crops over there. We need water for these crops and the factory that produces

some amount of wastewater during the production process. The generated effluent is treated

by the factory and disposed of properly. Since our farm area is adjacent to the factory as

mentioned above, the treated wastewater flows through the stream flowing around our area

and the crops we grow are also in dire need of water and the factory disposes of it.

This treated waste water is indirectly beneficiary for our crops. Therefore, we Promisee and

promisor made this agreement with mutual understanding. We requested to factory to provide

this treated water to us and also, we requested factory to provide this with factory expenses

and factory accepted the same. We do not have any complaint or objection. We are ready to

use this treated water for further eleven years.

3) There will be coordination between the factory and us for disposal of treated water. We are

writing and signing the agreement to ensure that the above-mentioned areas belong to us and

therefore we are writing this agreement. In case of any alterations, we will notify the factory in

writing and such alterations will be binding on the new holder.

4) This Agreement without any hesitation and without any hesitation and we have signed this

Agreement stating that this Agreement is fully acceptable to us. For any dispute we will sort it

out with mutual understanding.

5) The agreement is written in accordance with the guidelines of the Maharashtra Pollution Control

Board. So it is binding on both.

The factory has paid all the expenses of this agreement.

The deal is done as it comes.

Place - Bhavaninagar Promisor

Date - 28/02/2021

(Managing Director)

Shri Chhatrapati S.S.K. Ltd.,

Bhavaninagar

Signature:

1) 4)

2) 5)

3) 6)

Witness:

1)

2)

312

T.C.

I

&

I

I

~ ~ '«(:<hlfl ~ <hi'H!l l'11

111$1'<1~ fli$<hlfl ~ 9~f.o ~ ~. lj.tiT. ~1CI I 41'1llx, 01. ~. ftr. ~. ~9~9o~ ~- c614 Cf> 1 ~ tiilk1 Cf>

~~~~ C1<l cffl- ~'d' tro"- ~' "<1. ~Ci t 41•Pt'<, qr, ~. ftr. ~

~ .. .

XD 405132

313

<\)

~)

~)

h')

~)

G)

l9)

~)

~~,, ' '

~b ( \ <:T\ l L\\o.Q l. I~ v I' :-v' <S?ct I _!. Cflf- ~~ Cftl. ~- ;l~Dr; · 1"Jicr-~.

TTC ~- \¥"1 v ~- ' qo.,. t..

~Rll \.~ \ (""\. ... ~ PP\ \d( ~~(\L\C\ \~l~ctJ l.

Cflf- ':3 ( Cftl. EIGT- ~\f\~ 7fiq- ~.

TTC ~- af;r- <\ Tfd; {

~!tft a~~ _ \ n• __ ,.. lP.Jl !i. <$")1/)(t11~1Pf f~;f(~Gf?'(

Cflf- ~~ ~. ~- f)nJ! 1"Jicr-~. TTC ~- ( K .Z af;r-~ . .-

~~JJ;;rJ .w~, /rli51t~') --­

cnr- 3' «. ~-»zL 1"Jicr-~. TTC m-.~--l$r- ?2 7!1fj;j

ll

~ \34\!) <RI ~ ~ 'HM'II:ft ~ ¢1'11'<0\1111 fB .. 11Cl14"11 11'<. (fl. ~. fvr. ~. ~ \ntf \3NIGCf> ~ Cf)'{I'<1P'II ~ mn (1\ ~~C1~C'I~Jilo'l

q) CR ~ tufR $rrR 6T Jit\1'<1~ flt\¢1~ ~ q~f.o ~ ~ ~ q 1TGufr ~ fl5Cf'll:ft Cbi'<'<0\1111 3Rff. "'<1GX "<mR Cbi'<'<0\1111 ~ ~ wm:rG q ~ WI I fl <;iii I ~ l I cJ1d 1'<1 ~ "<1'roR Cf ~ '\3'tl1lGTl1f vM ~ ~ ~ Cb'< 0<11ill Cf ~ M ~ c::a<tfll<1 ~.

. .

314

T.C.

3t i\

.....\ ;..; ~ \:..

, ~ r ~~

ti;~ : ~ ilf~

~;; ~~ 1§~ -~

\ ~ ~-,~ ~

~~ J I ~w ~ ~ ~I ~ t

i ~ f . ~ t

J l i

~ ~ $ ~

lt~Ujh fii!ill

1~iilili 1!

i ~~-

1~ 1~ ~1 ! ~1!1 wP

~'~~il~ ~~tlw1; ~ ~! ~

t~: z ~ c:t

' ~

l$ "'~ ~ J

il ~ ~ h! U

~ !Jif: _ z~ ~ r ~~ ~ i! ~

.9 ? ~

~ ~ i i -G; ~ ~ fl Jr i l! j lJ j ! J ~ j.~

, ~ "

~ ·a

~ . ,

•~-9~ ~-~~~··

!-$~1t•J _g• I

r1p-u~1 ~~ 1uir~ i!ilz;~ -i ~

1 ~ i

f:A t?;

1 ~I i I j t $ ~ 1 ~Ill~ ~ ~ ~ i ~ l ~ d ~ . ~ i I I . . . 1 ;i ;~ ~!

--

--

--

--

~ 15" ~ ·~

--

--~

,.. o-

t"f')> ;)0

.:r

~ 1

;r d£&

tT

o

-t"f')>

:>

315

Translated on google Translator

Agreement

Dated : 27/03/2021

Shri Chhatrapati Sahakari Sugar Factory

Established under Maharashtra Co-operative Act 1960,

At/Po :Bhavaninagar, Tal. Indapur, Dist. Pune, 413104

On behalf of – Managing Director

Promisor

Shri. Hanumant Navnath Karwar

Age : 34 yrs, Occupation - Service,

At/p : Bhavaninagar, Tal. Indapur, Dist. Pune

To ...

1) Mr / Mrs. Hemlata Baburao Nimbalkar

Age – 43 years, Occupation – House- wife, Village- Sansar,

GAT No. : 713,715 Area : 09 Acres

2)Mr / Mrs. Hemant Baburao Gaikwad

Age :- 52 years, Occupation – farmer, Village- Sansar,

GAT No. :- 710 Area :- 01 Acres

3) Mr / Mrs.Houserao Waman Nimbalkar

Age :-28 years, Occupation – farmer, Village- Sansar,

GAT No. :-618 Area :- 08 Acres

4) Mr / Mrs. Nitin Rameshrao Katkar

Age :-46 years, Occupation – farmer, Village- Sansar,

GAT No. :-535/1 Area :- 12 Acres

5) Mr / Mrs. Ashokrao Ramrao Nimbalkar

Age :-65 years, Occupation – farmer, Village- Sansar, Promisee

GAT No. :-841 Area :- 03 Acres

6) Mr / Mrs. Jitendra Nanasaheb Nimbalkar

Age :- 45 years, Occupation – farmer, Village- Sansar,

GAT No. :- 843 Area :- 03 Acres

7) Mr / Mrs. Rohit Ramesh Nimbalkar

Age :-31 years, Occupation – farmer, Village- Sansar,

GAT No. :-616 Area :- 12 Acres

8) Mr / Smt. Santosh Dattatray Nimbalkar

Age :-40 years, Occupation – farmer, Village- Sansar,

GAT No. :-626 Area :- 07 Acres

316Translation of Page 313 to 315

We have the above Shri Chhatrapati Sahakari Sugar Factory Ltd., Bhawaninagar, Tal. Indapur,

Dist. Pune the Sugarcane Producer Member writes the agreement as follows:

1) It is a co-operative factory established and registered under the Maharashtra Co-operative

Societies Act, 1960. This sugar factory manufacturing the sugar and By-products like electricity

by using the sugarcane from its member and non-members from their area.

2) We writing this agreement are members / non-members of this factory and we belong from

above mentioned village and gut which is close to factory area. This area is owned by us and

we are growing crops over there. We need water for these crops and the factory that produces

some amount of wastewater during the production process. The generated effluent is treated

by the factory and disposed of properly. Since our farm area is adjacent to the factory as

mentioned above, the treated wastewater flows through the stream flowing around our area

and the crops we grow are also in dire need of water and the factory disposes of it.

This treated waste water is indirectly beneficiary for our crops. Therefore, we Promisee and

promisor made this agreement with mutual understanding. We requested to factory to provide

this treated water to us and also, we requested factory to provide this with factory expenses

and factory accepted the same. We do not have any complaint or objection. We are ready to

use this treated water for further eleven years.

3) There will be coordination between the factory and us for disposal of treated water. We are

writing and signing the agreement to ensure that the above-mentioned areas belong to us and

therefore we are writing this agreement. In case of any alterations, we will notify the factory in

writing and such alterations will be binding on the new holder.

4) This Agreement without any hesitation and without any hesitation and we have signed this

Agreement stating that this Agreement is fully acceptable to us. For any dispute we will sort it

out with mutual understanding.

5) The agreement is written in accordance with the guidelines of the Maharashtra Pollution Control

Board. So it is binding on both.

The factory has paid all the expenses of this agreement.

The deal is done as it comes.

Place - Bhavaninagar Promisor

Date - 27/03/2021

(Managing Director)

Shri Chhatrapati S.S.K.

Ltd.,Bhavaninagar

Signature:

1) 5)

2) 6)

3) 7)

4) 8)

Witness:

1)

2)

317

T.C.

Ax. R7

T.C.

.. ..... , • .., ... ,~ l:!'"ll~:

~: ~\qH, ~ \ \~H. ~\'.~l\ ~ : ., nc: ~'"c(

~ft I • 'H t<:-''""'~ ~. ~llfwr ~: ~\\~It\

J!.n. ~.I '\\~~\ f'All{ ~\\~~l

"R:~~ :

{1\Ait-~ If"' ~

""" ... ' ·~·~(r.·l

To,

-'JT e;:rllfu ~~RT ~T~x CJ51'lltCI JVJT f6:r; q~Of10f11':, ffi. ~!~. rtf. !'1

JTIR~ ~ ("An) fQ11( ID"~ \tq~ ?ow

I · Ou3illy Endorsed Ccmp~ny

Shri Chhatrapati S. S. K. Ltd; BHAVANINAGAR. TAl. INDAPUR, DIST. PUNE ,.IN CODE 41 31 64 - MAHAIUSHTRA (INDIA)

Maha rashtra Pollution Control Board, Jog Center, 3rd floor, Mumbai Pune Road, Wakdewadi,Pune, Maharashtra

Mr. Nit in Sh inde Regional Off icer

e-mail ID: [email protected] Ph. No.: 020-25811694

Subject: Reply to Show-cause notice for Proposed direction under 33 A of water l::iy MPCB.

Reference: 1. Your Letter no. MPCB/ROP/MPCB/PD/2107270001 dated 27.07.2021 ( Letter Received us on - 03.08.2021)

Sir,

We, Shri. Chhatrapati SaharakiSakhar Karkhana Ltd., Bhawaninagar, Tal.

Indapur and Dist. Pune received the MPCB show cause notice on 03.08.2021 . I n

this regard we are submitting 03 set copies (Annexure -10) of the documents as

per the instruction given us by you. Please find the submitted reply as follows;

Sr. Queries Annexure

1. You have not applied for renewal of consent within prescribed t ime l imit as per consent condition and you have operated your industry without making application for renewal for 63 days after expiry of consent on 31/7/2019. Also, you have operat ed your industry w ithout making application for renewal for 40 days after expiry of consent on 31/7/2020.

Sir, we apologize for not being able to submit our consent to operate renewal application in time due to some technical and financia l difficulties in the year 2019-20. This year we have I applied for a consent to operate renewal application as per stipulated time I.e., on 11/05/2021 (79 days before valid ity). We assure you that, we will submit the application for renewal of consent as per stipulated time.

2. You have not submitted half yearly compliance reports as per Environment Clearance condition to the prescribed authorities wit hin stipulated t ime period.

Agree, We have submitted half-yearly compliance reports as I per Environment Clearance condition to the prescribed

I authorities like MoEF&CC and MPCB within the stipulated II I

period from last year & we assure you that we will do it on a I continuous basis without any complaint In the future . I

(Annexure II) I I

!

I

I

Scanned w1th CamScanner

318

~3. rV~u have not provided air pollution control device such as ,,

dust collector 1 scrubber or ESP to the stack of 60-meter height and which is common to three boiler s having capacity of 20TPH, 20TPH & 35 TPH.

-1 We would like to sub~it you that, we are going to install new Wet ._• -

scrubber System for our 3500 TCD Plant (Unit no.l). In this regard Technical & commercial bid are completed & Civil work is III also going on, Further we want submit that, the Agreement and purchase order for the same is attached here with this reply letter. (Annexure III ) '

4. You have not provided flow to m easure the quantity of t reated for recycling. . ....

-1

Presently we have made full provision to measure the flow of treatment for recycling water. We assure you that, we will take IV

adequate care in this regard.

5 . You have not made alternative arrangement for the effluent

I 1 disposal on land in case of excess production.

We kindly draw your attention that, in case of excess production, we made a total 92 Acre bi-lateral agreement instead of 35 acres v with our farmers as per the demand for land irrigation as per MPCB guidelines(Annexure V)

6. You have not m ade arrangement with the farmers for disposal of treated effluent with validity period

As we submitted in above point, we made the bi-lateral agreement of total 92 Acre with our farmers . As per their irrigation demand for disposal of treated effluent with validity period as per MPCB VI

\ guidelines. We are already submitted to RO, MPCB Pune office. (Ann exure VI)

7 . You have n ot provided 15 days storage capacity tank as per \ CREP guidance for the storage of treated effluent to take

care during no de m and for irrigation. I

~The 15 days effluent storage tank is completed with HDPE lined &leak proof testing. The capacity of the storage tank is 1.50 Cr.

1 litres. For a better understanding of the board, we have attached VII some photographs of 15 days storage tank. (Annexure VII)

18. You have operated boilers without Online Continuous Environmental Monitoring system (OCEMS)

,----,

We have already installed OCEMS for two stacks separately (stack no.l &stack no.2) and connected to CPCB as well as MPCB server. Due to some technical error, the value of stack no.l is not displayed to MPCB Server but same stack online data displayed on CPCB server on continuous basis. We are apologies for this

VIII technical issue and assuring that this will not happen again and we will take care of it during the upcoming season. Stack no.2 already started to show it online data on MPCB and CPCB server from 16thFeb 2021.

I (Annexure VIII)

~ -

Scanned with CamScanner

319

T.C.

I. 1'ftmti'IIYR Qq"l\~ !

min: 'wnt. "\"'~· '\"'~" !(n'tir: .,n~ ~w~t't

~ I •'ttt-''''~~ ~.~~: ~\\,1)'\ ~.tT. -m-1.1 ,.,\,t'\ f"l1mf ~\qn

~') lJ;JqTcJ ~RT ar~x lPI'<{CJJiJT f6J; ~~)~'1~. Ql, ~,,~. ttl. svT

Jf'JR~ l"r.."'l ('lfRn) flur 11J)3 \I~HoV I

Ouallty Endorsed Company

Shri Chhatrapati S. S. 1{. Ltd; Cl ~"~:

~-~~~

~ .... : ·~·'1~1'1)'1'1( (~·)

BHAVANINAGAR, TAL. INDAPUR, DIST. PUNE P'IN CODE 413164 - MAHA~ASHTRA (INDIA)

f~:

9. You have not connected ETP outlet flow meter to the CPCB & MPCB Server/Portal.

We have connected ETP outlet flow meter to the CPCB & MPCB Server/Portal from last season. But due to some technical error the ETP outlet flowreadings were not seen or connected to MPCB server. In this regardwe assure you that, we will take adequate care for the same.

) 10 You have not provided CPU (Condensate Polishing Unit)

I As per the MPCB guideline we are initiated the construction of Sugar Condensate Polishing Unit (CPU). The Detailed CPU proposal prepared by M/s. Vasantdada Sugar Institute (VSI) Pune and same is enclosed for your ready reference (Annexure X) We are assuring you that the CPU will construct and commissioning before the end of the upcoming crushing season. Installation of the CPU unit is expensive and techn ical therefore require time to installation therefore please allow this extended period of six months. So that we can install

l proper and full-fledged CPU unit. (Annexure X)

Thanking you,

IX

X

Copy to: 1) Sub Regional Officer, MPCB, Pune -I I

Scanned with CamScanner ~

320

Description STACK-PM_U STACK_2-SPM_U

Prescribed Standards - -Maximum Data NA 23.29Minimum Data NA 5.6

Geometric Mean NA 19.38Median NA 20.52

Standard Deviation NA 4.3Maximum Value At Time NA 2021-03-28Minimum Value At Time NA 2021-04-17

Valid Data Points 0 63Total Data Points 142 142

Data Availability % 0.0% 44.37%

Sl No Time STACK-PM_U STACK_2-SPM_U

1 2020-12-01 NA NA2 2020-12-02 NA NA3 2020-12-03 NA NA4 2020-12-04 NA NA5 2020-12-05 NA NA6 2020-12-06 NA NA7 2020-12-07 NA NA8 2020-12-08 NA NA9 2020-12-09 NA NA10 2020-12-10 NA NA11 2020-12-11 NA NA12 2020-12-12 NA NA13 2020-12-13 NA NA14 2020-12-14 NA NA15 2020-12-15 NA NA16 2020-12-16 NA NA17 2020-12-17 NA NA18 2020-12-18 NA NA19 2020-12-19 NA NA20 2020-12-20 NA NA21 2020-12-21 NA NA22 2020-12-22 NA NA23 2020-12-23 NA NA24 2020-12-24 NA NA25 2020-12-25 NA NA26 2020-12-26 NA NA27 2020-12-27 NA NA

Maharashtra Pollution Control BoardSite Name: M/s Shree Chhatrapati Sahakari Sakhar Karkhana Ltd

Report: Custom ReportFrom Date: 2020/12/01 00:00:00 To Date : 2021/04/21 14:11:48

Ax. R8

T.C.

321

28 2020-12-28 NA NA29 2020-12-29 NA NA30 2020-12-30 NA NA31 2020-12-31 NA NA32 2021-01-01 NA NA33 2021-01-02 NA NA34 2021-01-03 NA NA35 2021-01-04 NA NA36 2021-01-05 NA NA37 2021-01-06 NA NA38 2021-01-07 NA NA39 2021-01-08 NA NA40 2021-01-09 NA NA41 2021-01-10 NA NA42 2021-01-11 NA NA43 2021-01-12 NA NA44 2021-01-13 NA NA

45 2021-01-14 NA NA46 2021-01-15 NA NA47 2021-01-16 NA NA48 2021-01-17 NA NA49 2021-01-18 NA NA50 2021-01-19 NA NA51 2021-01-20 NA NA52 2021-01-21 NA NA53 2021-01-22 NA NA54 2021-01-23 NA NA55 2021-01-24 NA NA56 2021-01-25 NA NA57 2021-01-26 NA NA58 2021-01-27 NA NA59 2021-01-28 NA NA60 2021-01-29 NA NA61 2021-01-30 NA NA62 2021-01-31 NA NA63 2021-02-01 NA NA64 2021-02-02 NA NA65 2021-02-03 NA NA66 2021-02-04 NA NA67 2021-02-05 NA NA68 2021-02-06 NA NA69 2021-02-07 NA NA70 2021-02-08 NA NA71 2021-02-09 NA NA

Sl No Time STACK-PM_U STACK_2-SPM_U322

72 2021-02-10 NA NA

73 2021-02-11 NA NA74 2021-02-12 NA NA75 2021-02-13 NA NA76 2021-02-14 NA NA77 2021-02-15 NA NA78 2021-02-16 NA 11.7679 2021-02-17 NA 15.7480 2021-02-18 NA 14.4381 2021-02-19 NA 21.1382 2021-02-20 NA 22.7883 2021-02-21 NA 20.3784 2021-02-22 NA 20.2085 2021-02-23 NA 19.6986 2021-02-24 NA 18.3487 2021-02-25 NA 14.7788 2021-02-26 NA 17.0089 2021-02-27 NA 14.7890 2021-02-28 NA 12.4291 2021-03-01 NA 17.6392 2021-03-02 NA 11.8793 2021-03-03 NA 17.7394 2021-03-04 NA 18.0495 2021-03-05 NA 19.0896 2021-03-06 NA 15.3797 2021-03-07 NA 20.5298 2021-03-08 NA 23.2799 2021-03-09 NA 22.61

100 2021-03-10 NA 22.42101 2021-03-11 NA 21.24102 2021-03-12 NA 21.34103 2021-03-13 NA 22.42104 2021-03-14 NA 22.23105 2021-03-15 NA 21.97106 2021-03-16 NA 23.15107 2021-03-17 NA 16.86108 2021-03-18 NA 16.71109 2021-03-19 NA 20.31110 2021-03-20 NA 19.24111 2021-03-21 NA 10.22112 2021-03-22 NA 11.84113 2021-03-23 NA 17.43114 2021-03-24 NA 23.28115 2021-03-25 NA 23.27

Sl No Time STACK-PM_U STACK_2-SPM_U323

116 2021-03-26 NA 23.28117 2021-03-27 NA 23.28118 2021-03-28 NA 23.29119 2021-03-29 NA 23.28120 2021-03-30 NA 23.28121 2021-03-31 NA 23.28122 2021-04-01 NA 23.29123 2021-04-02 NA 23.28124 2021-04-03 NA 23.29125 2021-04-04 NA 23.29126 2021-04-05 NA 23.28127 2021-04-06 NA 22.13128 2021-04-07 NA 19.19129 2021-04-08 NA 23.29130 2021-04-09 NA 23.28131 2021-04-10 NA 23.28132 2021-04-11 NA 23.27133 2021-04-12 NA 20.26134 2021-04-13 NA 15.01135 2021-04-14 NA 23.27136 2021-04-15 NA NA137 2021-04-16 NA NA138 2021-04-17 NA 5.60139 2021-04-18 NA 13.03140 2021-04-19 NA 10.34141 2021-04-20 NA 18.03142 2021-04-21 NA 21.12

Sl No Time STACK-PM_U STACK_2-SPM_U

Report Details: CSSKL | 2021-07-23 14:14:23 | Custom Report

324

Parameter ReportShri Chhatrapati sahakari sakhar karkhana limited

Generated On 2021-07-23 14:30:22Period 2020-12-01 00:00:00 - 2021-04-15 14:28:00Stations Stack_1,Stack_2

Generated By Rohit GaikwadStation Type CEMSParameters PM

S.No. Time Stack_1 PM (mg/nm³)(avg) Stack_2 PM (mg/nm³)(avg)

1 2020-12-01 00:00:00:000 36.47 21.57

2 2020-12-02 00:00:00:000 41.25 N/A

3 2020-12-03 00:00:00:000 41.44 N/A

4 2020-12-04 00:00:00:000 41.59 N/A

5 2020-12-05 00:00:00:000 41.54 N/A

6 2020-12-06 00:00:00:000 41.62 N/A

7 2020-12-07 00:00:00:000 41.52 N/A

8 2020-12-08 00:00:00:000 41.4 N/A

9 2020-12-09 00:00:00:000 41.28 N/A

10 2020-12-10 00:00:00:000 41.19 N/A

11 2020-12-11 00:00:00:000 41.33 N/A

12 2020-12-12 00:00:00:000 41.3 N/A

13 2020-12-13 00:00:00:000 41.36 N/A

14 2020-12-14 00:00:00:000 41.4 N/A

15 2020-12-15 00:00:00:000 41.4 2.99

16 2020-12-16 00:00:00:000 41.43 2.84

17 2020-12-17 00:00:00:000 41.45 3.1

18 2020-12-18 00:00:00:000 41.55 2.72

19 2020-12-19 00:00:00:000 41.4 1.78

20 2020-12-20 00:00:00:000 41.7 2.9

21 2020-12-21 00:00:00:000 41.81 3.02

325

S.No. Time Stack_1 PM (mg/nm³)(avg) Stack_2 PM (mg/nm³)(avg)

22 2020-12-22 00:00:00:000 41.85 2.14

23 2020-12-23 00:00:00:000 41.81 3.05

24 2020-12-24 00:00:00:000 41.74 3.19

25 2020-12-25 00:00:00:000 41.6 3.04

26 2020-12-26 00:00:00:000 41.62 2.93

27 2020-12-27 00:00:00:000 41.5 2.87

28 2020-12-28 00:00:00:000 41.45 2.89

29 2020-12-29 00:00:00:000 41.5 2.34

30 2020-12-30 00:00:00:000 41.55 3.22

31 2020-12-31 00:00:00:000 41.61 3.18

32 2021-01-01 00:00:00:000 41.5 2.89

33 2021-01-02 00:00:00:000 41.68 2.83

34 2021-01-03 00:00:00:000 41.55 2.33

35 2021-01-04 00:00:00:000 41.66 1.85

36 2021-01-05 00:00:00:000 41.52 2.83

37 2021-01-06 00:00:00:000 41.23 2.02

38 2021-01-07 00:00:00:000 41.25 2.1

39 2021-01-08 00:00:00:000 41.25 2.42

40 2021-01-09 00:00:00:000 41.18 2.4

41 2021-01-10 00:00:00:000 41.26 2.16

42 2021-01-11 00:00:00:000 41.33 2.19

43 2021-01-12 00:00:00:000 41.45 2.05

44 2021-01-13 00:00:00:000 41.55 2.55

45 2021-01-14 00:00:00:000 41.49 2.89

46 2021-01-15 00:00:00:000 41.43 1.27

47 2021-01-16 00:00:00:000 41.41 1.45

48 2021-01-17 00:00:00:000 41.01 2.09

326

S.No. Time Stack_1 PM (mg/nm³)(avg) Stack_2 PM (mg/nm³)(avg)

49 2021-01-18 00:00:00:000 40.86 2.76

50 2021-01-19 00:00:00:000 39.87 3.48

51 2021-01-20 00:00:00:000 40.97 3.36

52 2021-01-21 00:00:00:000 40.85 2.97

53 2021-01-22 00:00:00:000 41.05 2.89

54 2021-01-23 00:00:00:000 41.39 3.52

55 2021-01-24 00:00:00:000 41.29 3.54

56 2021-01-25 00:00:00:000 41.42 3.42

57 2021-01-26 00:00:00:000 43.61 3.01

58 2021-01-27 00:00:00:000 46.81 10.82

59 2021-01-28 00:00:00:000 N/A 10.2

60 2021-01-29 00:00:00:000 111.87 9.86

61 2021-01-30 00:00:00:000 111.75 12.15

62 2021-01-31 00:00:00:000 111.88 12.53

63 2021-02-01 00:00:00:000 113.2 13.81

64 2021-02-02 00:00:00:000 114.75 12.15

65 2021-02-03 00:00:00:000 114.97 12.99

66 2021-02-04 00:00:00:000 114.95 17.72

67 2021-02-05 00:00:00:000 114.87 14.84

68 2021-02-06 00:00:00:000 114.7 12.55

69 2021-02-07 00:00:00:000 114.95 16.63

70 2021-02-08 00:00:00:000 115.07 15.77

71 2021-02-09 00:00:00:000 115.11 12.27

72 2021-02-10 00:00:00:000 114.83 10.9

73 2021-02-11 00:00:00:000 114.73 9.57

74 2021-02-12 00:00:00:000 114.49 10.83

75 2021-02-13 00:00:00:000 97.28 15.78

327

S.No. Time Stack_1 PM (mg/nm³)(avg) Stack_2 PM (mg/nm³)(avg)

76 2021-02-14 00:00:00:000 88.15 13.5

77 2021-02-15 00:00:00:000 87.9 18.84

78 2021-02-16 00:00:00:000 87.82 17.4

79 2021-02-17 00:00:00:000 87.76 15.84

80 2021-02-18 00:00:00:000 88.13 14.98

81 2021-02-19 00:00:00:000 88.53 21.13

82 2021-02-20 00:00:00:000 88.48 22.78

83 2021-02-21 00:00:00:000 87.85 20.37

84 2021-02-22 00:00:00:000 87.52 20.18

85 2021-02-23 00:00:00:000 87.58 19.69

86 2021-02-24 00:00:00:000 87.14 18.34

87 2021-02-25 00:00:00:000 86.1 14.77

88 2021-02-26 00:00:00:000 86.58 17.0

89 2021-02-27 00:00:00:000 86.96 14.78

90 2021-02-28 00:00:00:000 86.53 12.42

91 2021-03-01 00:00:00:000 85.67 17.64

92 2021-03-02 00:00:00:000 86.3 11.87

93 2021-03-03 00:00:00:000 86.87 17.69

94 2021-03-04 00:00:00:000 86.93 18.67

95 2021-03-05 00:00:00:000 87.3 19.47

96 2021-03-06 00:00:00:000 87.1 15.88

97 2021-03-07 00:00:00:000 87.07 21.12

98 2021-03-08 00:00:00:000 87.27 22.92

99 2021-03-09 00:00:00:000 87.25 22.42

100 2021-03-10 00:00:00:000 86.74 22.71

101 2021-03-11 00:00:00:000 86.82 22.2

102 2021-03-12 00:00:00:000 86.8 20.65

328

S.No. Time Stack_1 PM (mg/nm³)(avg) Stack_2 PM (mg/nm³)(avg)

103 2021-03-13 00:00:00:000 87.19 22.55

104 2021-03-14 00:00:00:000 87.37 21.67

105 2021-03-15 00:00:00:000 87.31 22.11

106 2021-03-16 00:00:00:000 87.13 23.16

107 2021-03-17 00:00:00:000 87.13 18.57

108 2021-03-18 00:00:00:000 86.95 16.69

109 2021-03-19 00:00:00:000 87.02 20.14

110 2021-03-20 00:00:00:000 87.33 19.16

111 2021-03-21 00:00:00:000 87.75 10.12

112 2021-03-22 00:00:00:000 87.42 11.73

113 2021-03-23 00:00:00:000 87.69 17.5

114 2021-03-24 00:00:00:000 87.29 23.28

115 2021-03-25 00:00:00:000 86.91 23.28

116 2021-03-26 00:00:00:000 87.07 23.28

117 2021-03-27 00:00:00:000 87.0 23.28

118 2021-03-28 00:00:00:000 87.0 23.29

119 2021-03-29 00:00:00:000 86.93 23.28

120 2021-03-30 00:00:00:000 87.01 23.28

121 2021-03-31 00:00:00:000 87.19 23.29

122 2021-04-01 00:00:00:000 86.86 23.25

123 2021-04-02 00:00:00:000 87.29 23.28

124 2021-04-03 00:00:00:000 87.0 23.29

125 2021-04-04 00:00:00:000 86.86 23.29

126 2021-04-05 00:00:00:000 86.61 23.28

127 2021-04-06 00:00:00:000 86.8 22.17

128 2021-04-07 00:00:00:000 86.51 19.11

129 2021-04-08 00:00:00:000 86.69 23.29

329

S.No. Time Stack_1 PM (mg/nm³)(avg) Stack_2 PM (mg/nm³)(avg)

130 2021-04-09 00:00:00:000 86.83 23.28

131 2021-04-10 00:00:00:000 86.74 23.28

132 2021-04-11 00:00:00:000 86.92 23.28

133 2021-04-12 00:00:00:000 86.92 20.41

134 2021-04-13 00:00:00:000 86.87 16.16

135 2021-04-14 00:00:00:000 87.27 18.2

136 2021-04-15 00:00:00:000 87.25 14.69

Stack_1-PM Chart

Stack_2-PM Chart

330

All rights reserved 7of 7 www.logicladder.com

T.C.

331

PROPOSAL

OF

NEW CONDENSATE POLISHING UNIT FOR

TREATMENT OF 1300 M3/DAY SUGAR MILL

EXCESS CONDENSATE

FOR

M/S SHRI CHHATRAPATI SAHAKARI

SAKHAR KARKHANA LTD;

Prepared by

Department of Environmental sciences

VASANTDADA SUGAR INSTITUTE Manjari (Bk), Haveli, Pune 412 307

Tel: 020 2690 2100; Fax: 020 26902244

Web: www.vsisugar.com Email:[email protected]

July 2021

Ax. R9

T.C.

332

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 1

Proposal: New Condensate Polishing Unit for Sugar Mill Excess Condensate

Name of industry: M/s Shri Chhatrapati Sahakari SakharKarkhana Ltd,

Industry type:Sugar Industry

The capacity of plant: 6500TCD

Allied units:None

Address: A/p. Bhavaninagar, Tq. – Indapur, Dist - Pune

Contact person: 1) Mr. A. B. Jadhav (Managing Director )

2) Mr. S. S. Patil (Chief Chemist)

Contact no: 09860894779

E-mail:[email protected]

Visiting VSI official:

1. Dr. Eknath Alhat (Scientific Officer)

Department of Environmental Sciences,

Vasantdada Sugar Institute, Pune

333

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 2

I. Introduction

M/s.ShriChhatrapatiSahakariSakharKarkhana Ltd (SCSSKL) located at Bhawaninagar, Taluka:

Indapur, Dist.: Pune, Maharashtra, is amongst the oldest cooperative sugar mills established in

the state. The industry was registered in 1954 and had its first crushing season in 1957 with a

crushing capacity of 450 MT/day under its founder-chairman and chief promoter Late

SahebraoNamdevraoJachak. The mill has made steady progress since its inception and crushing

capacity was enhanced from 450 to 1250 TCD in 1965, from 1250 to 2000 TCD in 1992, and from

2000 to 4000 TCD in 1999. The management has expanded the sugar unit capacity from 4000 to

6500 TCD along with 18 MW Cogeneration units.

Maharashtra Pollution Control Board issued the show cause notice no.

MPCB/ROP/MPCB/SCN/210629-FFS-0099 dated 29/06/2021. As mentioned in the show cause

in point no.4, the mill has to fail to make a provision of condensate polishing unit (CPU). In

response to the said condition, the Management of SCSSKL allocated the work to VSI for the

preparation of a detailed proposal for the proposed sugar unit CPU. The VSI team visited at

SCSSKL site and took the necessary data from the mill officers and prepared a water budget to

know the actual quantity of excess condensate generation.

II. Hot Water Balance & Excess Condensate Generation:

Basic data: Following are some input taken for reference as a basic data

• Actual data on 07/01/2021

• DMR referred: 06/01/2021 (Crushing day: 71)

• Average crushing: 6227 TPD

The average crushing of the SCSSKL on 71 crop days for the crushing season 202021 is 6227

TPD. However, the water balance has been estimated by considering valid consent crushing

capacity of 6500 TCD. The water losses in the product as per the final manufacturing report in

Annexure I. As the exact quantities and flow measurements were not available, the estimates

have been done based on the daily manufacturing report and certain assumptions as per the

experience of the technical staff. The table given below contains the hot and cold water balance.

334

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 3

Table 1: Water Budget

# Particulars Quantity

M3/day

I. Boiler section

i. Water Input

1 Boiler 70 + 35(HP)+ 20 +35+20 = TP180 4320

2 Boiler input 180 TPH 4320

3 Steam generation TPH @ 86.6% efficiency i.e. 156 TPH 3744

ii. Water and wastewater Output

A. Steam/Condensate losses

1 Boiler blow down @ 5% (sent to GSR after cooling) 187

2 Overall process loss @4 % on steam generation 150

3 Overall vent losses @2% on steam generation 75

Total 412

B. Condensate recycle to boiler

1 Exhaust condensate from process 2795

2 Exhaust condensate from 6MW TG Set 537

Total 3332

Total net freshwater intake for boiler 412

iii. Net fresh water requirement for boiler

1 The net freshwater requirement to boiler @17.16 TPH 412

2 The old boiler make up water will be fulfilled with second body condensate 108

3 Net fresh water requirement for new boiler 412 – 108 = 304 m3/hr 304

iv. Water treatment plant

A. RO Plant

1 RO Intake 526.9

2 RO permit 222.2

3 RO Reject Sent to spray pond 304.7

B. Softener Plant

1 Softener Intake 319.5

2 Softener outlet 278.7

3 Softener plant wastewater and backwash send to ETP 40.8

V. Cooling tower

335

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 4

# Particulars Quantity

M3/day

Water requirement for a cooling tower for TG set

1 Cooling tower pump capacity 750 m3/hr @2% loss water requirement 15

m3/hr

360

II. Sugar process

i. Water input (6500 TPD)

1 Mill imbibition @ 28% on cane 1820

2 Steam exhaust from boiler @ 43% 2795

3 Water from cane @ 70% on cane 4550

Total 9165

ii. Hot water (Condensate) output from the process

1 Exhaust condensate from Q. B !st @43% on cane 2795

2 Vapour condensate from CJ @2.5% on cane 162.5

3 Vapour Condensate of all pans @ 25.5% on cane 1657.5

3 Vapor condensate(Q. body 2 )@ 28% on cane 1820

4 Vapour Condensate (SJ 1) @ 4.0% on cane 260

5 Vapour Condensate (SJ 2) @ 3.5% on cane 227.5

6 Vapour Condensate(Q. body 3)@ 10% on cane 650

7 Vapour Condensate ( RJ 1st& 2nd ) @ 7.5 % on cane 487.5

8 Vapour Condensate(Q. body 4)@ 2.5 % on cane 162.5

Total 6565.5

iii. Hot water (Condensate) consumption

1 Required at boiler @ TPH of steam generation 2795

2 Required for imbibitions at mill@ 28% on cane 1820

3 Required for MOL Preparation@ 2.5 % on cane 162.5

4 Recycle at vacuum filters@ 3.5 % on cane 227.5

5 Recycle at Pan &Molasses movement @ 4 % on cane 292.5

6 Recycle for sugar [email protected]% on cane 130

7 Recycle at magma mixers. @ 2% on cane 130

8 Recycle at A C/F M/c-4 Nos @ 2 % on cane 130

9 Recycle for Cont.M/c-9 Nos @ 2% on cane 130

10 Required for soda boiling at Evaporator, Pan soda Boiling, Cleaning of the

screen of centrifugal@ % on cane

00

336

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 5

# Particulars Quantity

M3/day

Total 5817

iv. Excess Condensate Generation

1 Water losses as spray pond overflow water @ 90lit /MT 585

2 Net excess condensate generation 6565.5 – 5817 = 748.5 748.5

iv. Water loss in product and by-product

1 Water in bagasse@50% moisture &@ 28% production on cane 910

2 Water in pressmud@70%moisture&@4.0% production on a cane 182

3 Water in final molasses @12% moisture &@ 4.5% production on cane 35

Total 1127

By considering the above-mentioned hot water balance, the excess condensate generation is

748.5 m3/day i.e. 11.5% on cane crush. However during the worst case operation of the sugar

unit the maximum condensate generation is about 20% on cane crush, hence during the

designing of the proposed CPU the quantity of excess condensate is considered 1300 m3/day.

III. Details of Proposed CPU: The maximum combined excess condensate load is considered 1300

m3/day and treatment technology are designed by considering the following parameters.Table

2: Quantity and quality of combined excess condensate

Table 2: Quality and quantity of untreated and treated condensate

Sr. no Parameter Inlet parameters Out let parameters

1 Quantity (m3/day) 1300 1300

2 pH 7.0 – 8.5 7.0 – 8.5

3 Temperature (0C) 37-40 25 - 30

4 COD (mg/l) 450 – 500 <100

5 BOD (mg/l) 150 - 200 <30

6 TDS (mg/l) 200 - 300 <150

It is proposed to treat the excess condensate in three-stage

o Primary Treatment: Cooling and collection tank

o Secondary treatment: Anaerobic filter followed by Activated Sludge Process followed by

secondary clarification

o Tertiary treatment: Chlorination followed by sand and carbon filtration

o Sludge treatment: Dewatering followed by drying

337

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 6

Detailed description of units

1) Preliminary & PrimaryTreatment:

i. Equalization Cum Cooling Tower tank: This unit has the objective of supplying equal

quality and quantity of effluent to the next unit i.e. equalizing the variation in wastewater

quality and flow. Combined condensate from sugar mill (1300 m3/day) has an 80-85oc

temperature. This temperature needs to be reduced to 35-40oc SCSSKL has two numbers

cooling towers near process house, expected temperature reduction after these two cooling

towers will be the 45-50 oc. One additional cooling tower is proposed to install at the CPU site

to achieve the optimum temperature of condensate i.e. 35 - 40 oc. The volume of this tank will

be 325 m3

ii. Neutralizationtank:Condensate coming from the sugar unit has neutral pH 7.0 – 7.5,

sometime due to faulty operation of pans and various evaporation body the condensate may

be slightly acidic in nature. During this situation pH need to be maintained near neutral hence

neutralization tank is proposed. The volume of the proposed neutralization tank will be 12.5

m3

2) Secondary Treatment

i. Anaerobic Filter: This is first secondary treatment unit where the effluent is treated with

anaerobic microorganisms. Anaerobic indicates that the treatment is without or in absence of

air. During this treatment, the COD can be reduced up to 60% and BOD 70%. This treatment

avoids the shock load on aerobic treatment and increase the efficiency of plant. Anaerobic

filter of volume is proposed 900 m3. The plastic media will provided in the filter to increase

the available surface area to anaerobic microbes to increase the efficiency of plant. The

anaerobic filter proposed to use as it is.

ii. Pre-Aeration & Aeration tank: It is proposed to provide 87.5 m3 capacity of pre-aeration

tank to remove the trap gases form the anaerobically treated condensate. Aerobic treatment

is the second tank where microbial activity reduces the COD and BOD through aerobic

treatment. In this unit, Mixed Liquor Suspended Solids (MLSS) are maintained by controlling

parameters like DO, pH, temperature, etc. MLSS is maintainedin the range of2500 to 3000

mg/lit. Food to microorganism ratio is of 0.2 – 0.25.Microorganisms utilizes organic matter as

food in presence of air and converts it into biomass and carbon dioxide. Hence, the pollutants

get reduced after this treatment by around 95-98%. The volume of aeration tank is proposed

of 700 m3and retention time in both aeration tank is more than 14 hrs.The treated water is

then sentto secondary clarifier to separate the bio-sludge and treated wastewater.

iii. Secondary Clarifier :In this process, sludge is settled by gravity at the bottom of the clarifier

and collected by clarifier mechanism. Then collected sludge is separated with the help of

338

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 7

sludge pump and sent back to the aeration tank to maintain the MLSS concentration. Excess

sludge from the process is sent to the decanter for dewatering of sludge. At present TMSSKL

has secondary clarifier to remove the bio-sludge from aerobically treated condensate. It is

proposed to provide the secondary clarifier of 216 m3

3) TertiaryTreatment

i. Chlorine contact tank (Existing): This is a tertiary treatment where the microbial activity is

suppressed by using the sodium hypo chlorite. This tank is called as chlorine contact tank. It

is proposed to construct a new chlorine contact tank of 96 + 96m3.

ii. Pressure Sand Filter and Activated Carbon Filter: The treated wastewater is filtered through

multimedia sand and carbon series. During this filtration, the suspended particulate matter

and odor forming pollutants are removed. It is proposed to installed both filters at the old

ETP oil and grease tank

4) Sludge treatment:

The dewatering of secondary clarifier sludge by filtration mechanism is the function of sludge

drying beds (SDB). The filtrate of the SDB will recycle back to anaerobic filter. The 200 m3 of

volume of SDB is proposed.

IV. Details of civilTanks

Table 3: Design details for CPU units

# Unit Specifications

1 Collection / Equalization Tank New

No. of units 01

Volume 325 m3

Size 13.0 m x 12.5 m x 2.0 m SWD

Free board 0.3 m

RCC M25 grade & TOR steel

PCC bending PCC M10 grade

Plaster CM 1:4 internal

Sand face plaster external CM 1:4 base coat

and CM 1:3 finishing coat

Shape Rectangular

2 Neutralization Tank New

No. of units 01

Volume 12.5 m3

339

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 8

# Unit Specifications

Size 2.5 m x 2.5 m x 2.0 m SWD

Free board 0.3m

MOC RCC M25 grade & TOR steel

PCC bending PCC M10 grade

Plaster CM 1:4 internal

Sand face plaster external CM 1:4 base coat

and CM 1:3 finishing coat

Shape Rectangular

3 Anaerobic filter tank New

No. of units 01

Volume 900.0 m3

Size 12.0 m x 12.5 m x 6.0 m SWD

Free board 0.5 m

MOC RCC M25 grade & TOR steel

PCC bending PCC M10 grade

Plaster CM 1:4 internal

Sand face plaster external CM 1:4 base coat

and CM 1:3 finishing coat

Shape Rectangular

4 Pre- Aeration tank New

No. of units 1

Volume 87.5m3

Size 2.5 m x 10.0 m x 3.5 m SWD

Freeboard 0.5 m launder need to be constructed

MOC RCC M25 grade & TOR steel

PCC bending PCC M10 grade

Plaster CM 1:4 internal

Sand face plaster external CM 1:4 base coat

and CM 1:3 finishing coat

Shape Square

5 Aeration tank New

No. of units 1

Volume 700 m3

340

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 9

# Unit Specifications

Size 20.0 m x 10.0 m x 3.5 m SWD

Freeboard 0.5 m launder need to be constructed

MOC RCC M25 grade & TOR steel

PCC bending PCC M10 grade

Plaster CM 1:4 internal

Sand face plaster external CM 1:4 base coat

and CM 1:3 finishing coat

Shape Square

6 Secondary clarifier New

No. of units 1

Volume 216.5 m3

Size Ø10.5 m X 2.5 m

Free board 0.3 m

MOC RCC M25 grade & TOR steel

PCC bending PCC M10 grade

Plaster CM 1:4 internal

Sand face plaster external CM 1:4 base coat

and CM 1:3 finishing coat

Shape Circular

7 Sludge sump 2

No. of units 1

Volume 8.0 m3

Size 2.0 m x 2.0 m x 2.0 m

PCC bending PCC M10 grade

MOC RCC M25 grade & TOR steel

Plaster CM 1:4 internal

Sand face plaster external CM 1:4 base coat

and CM 1:3 finishing coat

Shape Square

8 Holding & Chlorine contact tank

No. of units 2

Volume 96.0 + 96.0m3

Size 8.0 m x 6.0 m x 2.0 m X 2 nos.

341

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 10

# Unit Specifications

PCC bending PCC M10 grade

MOC RCC M25 grade & TOR steel

Plaster CM 1:4 internal

Sand face plaster external CM 1:4 base coat

and CM 1:3 finishing coat

Shape Rectangular

9 Sludge drying beds New

No. of units 4

Volume 50.0 m3 (each)

Size 5.0 m x 10.0 m x 1.0 m

Free board UCR/filling pitching (CM 1:6)

PCC bending PCC M10 grade

MOC BMS/UCR

Plaster CM 1:4 internal

Sand face plaster external CM 1:4 base coat

and CM 1:3 finishing coat

Shape Rectangular

Table 4: Electromechanical Specification for CPU units

Sr. No. Particulars Specification

I. Mechanical Specification

1 Agitator

Location Neutralization tank

ii Quantity 1

iii Application Mixing of lime slurry with effluent

iv Size Suitable for neutralization tank (2.0 M X

2.0 M X 2.0 M)

v Motor drive 1.0 HP, 1440 RPM, 415V, 50C/s 3 Phase

AC

vii Motor Make Crompton/Kirloskar

viii Gear box Worm gear box

ix Gear box make Radicon / Shanthi / Equivalent

342

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 11

2 Condensate feed pump

i Location Neutralization Tank

ii Quantity 2 (1 W & 1 S)

iii Application To feed condensate to primary anaerobic

filter

iv Type Centrifugal, Horizontal & Self Priming

v Capacity 75 m3/hr

vii Head 14 m

viii MOC CI

ix Pump make Kirloskar / Johnson

x Electric Drive Suitable HP/10 HP

3 Phase, Kirloskar/Crompton make

xi Accessory Coupling with guard, motor cover etc.

3 Anaerobic filter media

i Location Anaerobic filter tank

ii Quantity 234 m3

iii Application To provide the surface area for anaerobic

microbes

iv Size 1200 mm X 600 mm

v MOC PVC

vi Weigh 35 kg/m3

vii Thickness 0.3 (78), 0.4(78) & 0.5 (78)

vii Piping As per requirement to distributes the

effluent flow in tank

4 Clarifier Mechanism

i Location At Secondary Clarifier

ii Quantity 1

iii Application Scraping and collection of settled sludge

at central sludge well

iv Size Suitable for secondary clarifier civil tank

sizes

v Accesses

bridge

MS Fabricated with 0.8 meter width up to

center

vi Drive Central driven by worm & worm wheel

343

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 12

through and sprocket connected to

motor coupled with gearbox

vii Motor 1.0 HP/suitable 4 Pole, 3ph, 440 volts AC.

Crompton/ Equivalent

viii Gearbox Radicon / Shanti / Equivalent

ix Central shaft MS with heavy pipe couple with epoxy

coating, coupled with drive housing

x Scraper MS epoxy painted scraper arms of

structural framework with blades to

sweep the tank bottom twice per

revolution. Scraper provide with

neoprene rubber squeeze to collect the

sludge at the center point

xi Scraper arms

lifting

The mechanism is provided with special

arrangement for lifting the scraper in

case of over loading jamming of the

mechanism

xii Feed well MS with epoxy painted feed well

supported from the bridge

xii Painting All wetted part will be coated with 2

layer of coal tar epoxy paint remaining

with 2 coat of enamel paint

5 Sludge withdrawal pump

i Location At secondary clarifier

ii Quantity 2 (1W + 1S)

iii Application To withdraw sludge from clarifier and

send to sludge drying beds/ recycle

iv Type Centrifugal, horizontal, Self-priming

series

v Capacity 3.0 m3/hrs

vi Head 12.0 M

vii MOC CI

viii Drive Suitable motor, 3 Phase, Kirloskar/

Crompton make

344

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 13

ix Pump make Kirloskar / Johnson

x Accessories Coupling, coupling guard, motor cover

etc.

6 Air Blower

i Location Near aeration tank

ii Application Supply of air to both the aeration tank

iii Quantity 2 no. (1W + 1S)

iv Capacity 750 m3/Hr

v Pressure 0.5 Kg/cm2

vi MOC CI

vii Motor (Drive) Suitable for mentioned blower, 3 Phase,

Crompton / Kirloskar make

viii Accessory MS base plate, safety valve, suction filter,

silencer, NRV, V-belt, Belt guard, Drive

and driven pulleys, and extra pulleys to

increase the air quantity if needed

ix Blower make Beta/ Everest/ Kulkarni / Green field

/Usha

7 Air Diffuser system

i Location In aeration tank

ii Application Distribution of air in aeration tank in a

fine bubble

iii Quantity 1 lot (76 approx.)

iv Size (62.0 mm Ø X 2000 mm Length)

v Type Submerged, fine bubble diffuser

assembly using tubular EPDM

membrane

vi Membrane

Make

EPDM

vii Diffuser make OTT / RESAU

viii Inner support

tube of diffuser

Rigid PVC pipe,

ix Air flow range

of diffuser

0-10 Nm3/Hr/meter length of diffuser

345

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 14

x Diffuser

installation

type

Fixed

xi Pipe 100 mm Ø, PVC 10kg pressure

xii MOC pipe Plastic with high strength/ GI

8 Filter Feed Pump

i Location At Holding tank

ii Quantity 2 (1W + 1S)

iii Application To feed the treated effluent to

multimedia filter

iv Capacity 75 m3/hr

v Head 30.0 m

vi Type Centrifugal, horizontal, mono-block

vii MOC CI

viii Drive 25 HP/Suitable Electrical drive, 3Phase,

motor make -Kirloskar / Crompton

ix Pump make Kirloskar / Johnson

x Accessory Coupling, coupling guard, motor cover

etc.

9 Hypo dosing system

i Location At Holding tank

ii Quantity 1 lot

iii Application To dose hypochlorite solution to treated

effluent

iv Capacity 100 liters

v MOC HDPE

vi Make Sintex /Equivalent

10 Dosing pump

i Location Holding tank

ii Application To dose the chemical to tread effluent

iii Quantity 1

iv Type Electronic, Diaphragm

v Capacity 0-5 l/h with suitable electrical drive

vi Pump make UKL/ Aquanomics / Edose/ Equivalent

346

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 15

11 Media filter

i Location After holding tank

ii Application Polishing treated effluent

iii Quantity 2 (1 for multi-media & 1 for carbon)

iv Size 2500 mm Ø, 2500.0 HOS at pressure 3.0

Kg/cm2

v Media depth 2250 mm

vi Media Under bed with graded silica sand with

activated carbon

vii MOC MS – epoxy

12 Piping

I Piping from air

blower to

aeration tank

bottom

MOC- MS,

Size: 150 mm Ø

As per IS standards size

Note – All interconnecting pipes shall be HDPE/ RCC, 200 mm Ø. Suction and delivery for pump

shall be MS pipe or CI pipe.

13 Gate Valve

i Type Non rising Spindle Flanged

ii Standards IS 780

iii Body CI

iv Flanged To be drilled as per BS-10

v Make Kirloskar

vi Quantity 1 lot (As per requirement)

14 Non return valve

i Type Swing type Flanged

ii Standards IS 5312 (Part-I)

iii Body CI

iv Flanged To be drilled as per BS-10 standards

table D

v Make Kirloskar

vi Quantity 1 lot (As per requirement)

II. Electrical Specifications

1 Control panel

347

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 16

i Location MCC Room

ii Quantity 1

iii Description • Control panel will be fabricated in 14

SWG/ 16 SWGCRCA sheet with non-

compartment. Dust and vermin

proof.

• One incoming feeder will be

provided which will have ammeter,

voltmeter, indicating lamps and

energy meter

• Outgoing feeders will be as per drive

of mechanical equipments. Each

outgoing feeder shall have 1 no. MCB,

contactor, overload relay, on/off

push button, indicating lamps,

neutral link, and one set of terminal

block

iv Make of

switchgears

Siemens / L & T

2 Cabling

i Description Electrical cabling shall be provided

underground from control panel to

various unites of effluent treatment plant

with proper landmark. The both end of

the cable should be proper lug

ii Size As per capacity of motor /drive

iii MOC Copper/ Aluminum

iv Make CCI/ Polycab / Equivalent

3 Earthing

i Location Near Motor/ Drive of ETP

ii MOC GI wire (6-8 SWG)

III. Details of Instrumentation

I Pressure Gauges

i Location Delivery of pump and blower

348

Praposal_CPU_Sugar_ShriChhatrapati SSKL, Bhavaninagar 17

ii Application To indicate the pressure

iii Quantity 1 lot (As per requirement)

iv Type Bourdon / Diaphragm

v Range 0 to 4 kg/cm2

vi Make Wika/ H guru/ Equivalent

Dr. E. P. Alhat Dr. Deepali Nimbalkar

Scientific officer Senior Scientisc & Head

Dept of Environmental Sciences Dept of Environmental Sciences

349

350

-

HHATRAP HA KAR

Bhavaninagar~ Tal.: lndapur, Dist.: Pune (413104} hone: 02118 ... 266231/ 32/ 86

1 Webs~te : www.shrichhatrapatisugar.com , E-mail : [email protected]/ [email protected]

------1 i 4: I ·l 3 ;I: t·l i tlj ::::11 ... _____ . ----

our co-operative sugar factory located at Bhavaninagar, ! Tal. lndapur, Dist. Pune, invite engineering, procurement & commissioning bidders for following works-Terms and Condition : · ·

1 Design, Manufacture, Supply, Errection & · Commissioning 1300M3/ Day· · · capacity . .. Sugar Conden~~te Polishing 5000/- 1,00,000/­Unit (CPU) to ·· treat . sugar factory · condensate (Only Electromechanical Work) ·

Sugar Condensate ·· Polishing Unit (CPU) system technical & commercial offer should be submitted in a separate sealed envelope at the factory site before stipulated period. And it is mandatory to be deposit the tender fee at time of purchase tender & EMD amount at the time of submitting offer. Tender will be available during working hours from Dt. 05-08-2021 to Dt. 09-08-2021 at karkhana office before 6.00 PM last date of submission will be on dated 09-08 .. 2021 during working hours at karkhana office.

A. B. Jadhav A. H. Patll P. T. Kate Managing Director Vice-Chairman Chairman

351

T.C.

Minutes of Meeting

.... J)+ . 0 4 ( 0 q , 2-o 2.] \\aW\ +:a \2-·~~P"1

Subject:- Technical Bid for Sugar CPU (1300 M3 /Day) of M/s Chhatrapati Sahakari Sakhar Karkhana Limited, Bhawaninagar, Baramati Pune

Team of M/s Chhatrapati SSKL, Bhawaninagar, Baramati, Pune visited VSI for technical bid for Sugar Condensate polishing unit of capacity 1300 M3 /Day, Also supplier listed below

called for the same.

Technical specifications given in the CPU proposal, detailed drawings, Supply, erection and commissioning of the electromechanical units discussed with all the suppliers separately

and it is recorded by M/s Chhatrapati SSKL team and VSI team

•!• Mfs Chhatrapati SSKL Team

1) Mr. A B. Jadhav (Managing Director)

2) Mr. S. S. Patil (Chief Chemist) ~ · 3) Mr. R. L. Gaikwad (Environment ~fflcer) 4) Mr. T. B. Kharade (Civil Engineer) 5) Mr. S. G. Bhosale (Mechanical Engineer)

•!• VSI Team ("\\ 1) Dr. D. S. Nimbalkar (Sr. Scientist and HOD dept of Environment Sciencesb 2) Mr. Kapil Up hade (Research Assistant dept of Environ jences )

•!• Suppliers

-

# Name of Company Company Representative 1 Ecoboard Ind Ltd Mr. Tony David 2 Niretech Pvt Ltd Mr. Vi jay 'ilngale 3 Crown Chemicals Mr. Vijal Raul

Mr. Yele 4 Aquatech Systems Mr. Bhore

Mr. Rishekesh Patil 5 WTE Infra Projects Mr. Avinash Patil 6 Global Envirotech Mr. Madhukar Sawant 7 JRD Sales & Services Mr. Ramkrushna Waghire

Mr. Madhusudan 8 SBS water & Infra Project Not Attended

352

Application for Consent/ Authorisation

Sir,I/We hereby apply for*

1. Consent to Establish/Operate/Renewal of consent under section 25 and 26 of the Water (Prevention & Control of Pollution) Act, 1974 asamended.

2. Consent to Establish/Operate/Renewal of consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981, asamended.

3. Authorization/renewal of authorization under Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 inconnection with my/our/existing/proposed/altered/ additional manufacturing/processing activity from the premises as per the details givenbelow.

Consent Information

UAN No: Application submitted on:MPCB-CONSENT-0000113932 11-05-2021

Industry Information

Consent To: IIN No.: Submit to:Renewal (Normal) SRO - Pune I

Type of institution: Industry Type: Category: Scale:Industry R12 Sugar ( excluding

Khandsari)Red L.S.I

EC Reqd. EC Obtained EC Ref. No.No No -

Whether construction-buildup area is more than 20,000sq.mtr.(Existing Expansion Unit)

No

General Information

1. Name, designation, office address with Telephone/Fax numbers, e-mail of the Applicant Occupier/Industry/Institution / Local Body.

Name AddressGOVIND MAHADEV ANARSE atpost-bhavaninagar taluka-indapur dist-pune

Designation TalukaMANAGING DIRECTOR INDAPUR

Area DistrictBHAVANINAGAR Pune

Telephone Fax9075658383 02118266253

Email Pan [email protected] AAAAS3869G

Ax. R10

T.C.

353

2. (a) Name and location of the industrial unit/premises for which the application is made (Give revenue Survey Number/Plot numbername of Taluka and District, also telephone and fax number)

Industry nameSHRI. CHHATRAPATI SAHAKARI SAKHAR KARKHANA LTD, BHAVANINAGAR

Location of Unit Survey number/Plot NumberBhavaninagar 122

Taluka DistrictIndapur Pune

(b) Details of the planning permission obtained from the local body/Town and Country Planning authority/Metropolitan Developmentauthority/ designated Authority.

Planning permission Planning AuthorityGrampanchayat Sansar Grampanchayat Sansar

Name of the local body under whose jurisdiction the unit is located and Name of the licence issuing authority

Name of Local Body Name of the licence issuing authorityGrampanchayat Sansar Govt of Maharashtra

3. Names,addresses with Telephone and Fax Number of Managing Director / Managing Partner and officer responsible for mattersconnected with pollution control and/or Hazardous waste disposal.

Name of Managing Director Telephone numberHanumant Navnath karwar 02118266231

Fax number Officer responsible for day to day business02112 266253 Managing Director

4. (a.) Are you registered Industrial unit ? No

Registration number Date of registrationG/269 06/08/1955 May 5, 1955

5. Gross capital investment of the unit without depreciation till the date of application (Cost of building, land, plant and machinery). (Tobe supported by an affidavit/undertaking on Rs.20/- stamp paper, annual report or certificate from a Chartered Accountant for proposedunit(s), give estimated figure)

Gross capital (in Lakh) * Verified * Terms * Consent Fee22336.07 CA Certificate 1 446721.00

6. If the site is located near sea-shore/river bank/other water bodies/Highway, Indicate the crow fly distance and the name of the waterbody, if any.

Distance From Distance(Km) * NameSH/NH 0.00 --NA--

River 0.00 Nira

Human Habitation 0.00 --NA--

Religious Place 0.00 --NA--

Historical Place 0.00 --NA--

Creek/Sea 0.00 --NA--

6b. Enter Latitude and Longitude details of site

Latitude Longitude18.1163 74.6831

354

7. Does the location satisfy the Requirements Under relevant Central/State Govt. Notification such as Coastal Regulation Zone.Notification on Ecologically Fragile Area, Industrial Location policy, etc. If so, give details.

Location Approved IndustryArea

Sensitive Area If Yes, Name Of Area Industry Location withReference to CRZ

Bhavaninagar No No NA A4

8. If the site is situated in notified industrial estate,

Details(a) Whether effluent collection,treatment and disposal system hasbeen provided by the authority.

No NA

(b) Will the applicant utilize thesystem, if provided.

No NA

(c) If not provided, details of proposedarrangement.

NA

9.

(a) Total plot area (in squear meter) (b) Built up area and (in squear meter) (c) Area available for the use oftreated sewage/ trade effluent forgardening/irrigation. (in squear meter)

24000 12000 23 Hectares

10. Month and year of commissioning of the Unit.

2017-11-17

11. Number of workers and office staff

Workers staff Hrs. of shift Weekly off580 240 08 Sunday

12.

(a) Do you have a residentialcolony Within the premisesin respect of Which thepresent application is Made?

No No

(b) If yes, please state population stayingNumber of person staying Water consumption Sewage generation Whether is STP provided?

20 16 Yes

(c) Indicate its location and distance with reference to plant site.Number of person staying Water consumptionBhavaninagar 02

13. List of products and by-products Manufactured in tonnes/month, Kl/month or numbers/month with their types i.e.Dyes, drugs etc.(Give figures corresponding to maximum installed production capacity

Products Name and Quantity

ProductName

UOM ProductName

Existing Consented ProposedRevision

Total Remarks

Sugar(excludingKhandsari)

MT/M White CrystalSugar

21695 21695 00 21695 NA

Products Name and Quantity

Product Name UOM Quantity RemarksBagasse MT/M 56970 NA

355

Pressmud MT/M 7970 NA

Molasses MT/M 7970 NA

Electricity MW 18 NA

14. List of raw materials and process chemicals with annual consumption corresponding to above stated production figures, intonnes/month or kl/month or numbers/month.

Name of Raw Material UOM Quantity HazardousWaste

HazardousChemicals

Remarks

Sugar Cane MT/Day 6500 No No NA

15. Description of process of manufacture for each of the products showing input, output, quality and quantity of solid, liquid andgaseous wastes, if any from each unit process.

Uploaded

Part B : Waste Water aspects

16. Water consumption for different uses (m3/day)

Purpose Consumption EffluentGeneration

Treatment Remarks Disposal Remarks

Domestic Pourpose 20 16 Septic Tank &Soak Pit

NA On Land forGardening

NA

Water gets Polluted& Pollutants areBiodegradable

484 650 Primary +Secondary +Tertiary

NA On Land forGardening

NA

Water getsPolluted,Pollutantsare notBiodegradable &Toxic

00 00 --NA-- NA --NA-- NA

IndustrialCooling,spraying inmine pits or boilerfeed

125 125 Primary +Secondary

NA On Land forGardening

NA

Others 00

17. Source of water supply, Name of authority granting permission if applicable and quantity permitted.

Source of water supply Name of authority granting permission Qauntity permittedNira Left Canal Sub Divisional Engineer 999

18. Quantity of waste water (effluent) generated (m3/day)

Domastic Boiler Blowdown Industrial Cooling water blowdown16 125 650 120

Process DM Plants/Softening Washing Tail race discharge from120 138 20 20

* 19. Water budget calculations accounting for difference between water consumption and effluent generated.

125

20. Present treatment of sewage/canteen effluent (Give sizes/capacities of treatment units).

Capacity of STP (m3/day)

356

00

Treatment unit Size (mxm) Retention time (hr)Soak pit 54 12

21. Present treatment of trade effluent (Give sizes/capacities of treatment units) (A schematic diagram of the treatment scheme withinlet/outlet characteristics of each unit operation/process is to be provided. Include details of residue Management system (ETP sludges)

Capacity of ETP (m3/day)1000

Treatment unit Size (mxm) Retention time (hr)Screen Bar 7.2 1

O & G Chamber 34 0.5

O & G Collection tank 1 1

EQT 175 4.0

NT 10 0.25

Surge Tank 216 5

Anaerobic Pond 2640 60

Aeration Tank 812 20

Sec. Clariefier 158 4

SDB 10x5x1 06 nos

Treated Effluent Collection Tank 5x5x2 1

22.

(i) Are sewage and trade effluents mixed together? No

If yes, state at which stage-Whether before, intermittently or after treatment. NA

23. Capacity of treated effluent sump, Guard Pond if any.

Capacity of treated effluent sump (m3) 15000

Effluent sump/Guard pond details No

If yes, state at which stage-Whetherbefore, intermittently or aftertreatment.

No

24. Mode of disposal of treated effluent With respective quantity, m3/day

(i) into stream/river (name ofriver)

NA (ii) into creek/estuary (nameof Creek/estuary)

NA

(iii) into sea NA (iv) into drain/sewer (ownerof sewer)

NA

(v) On land for irrigation onowned land/ase land. Specifycropped area.

97 ACRE (vi) Connected to CETP NA

(vii) Quantity of treatedeffluent reused/ recycled,m3/day Provide a locationmap of disposalarrangement indicating theoutler(s) for sampling.Treated effluent reused /recycled (m3/day)

1000

25. (a) Quality of untreated/treated effluents (Specify pH and concentration of SS, BOD,COD and specific pollutants relevant to theindustry. TDS to be reported for disposal on land or into stream/river.

357

Untreated Effluent

pH 5.86

SS (mg/l) 1000

BOD (mg/l) 800

COD (mg/l) 1200

TDS (mg/l) 1400

Specific pollutant ifany

Name Value

1 NA NA

Treated Effluent

pH 7.75

SS (mg/l) 100

BOD (mg/l) 100

COD (mg/l) 250

TDS (mg/l) 100

Specific pollutant ifany

Name Value

1 NA NA

(b) Enclose a copy of the latest report of analysis from the laboratory approved by State Board/ Committee/Central Board/CentralGovernment in the Ministry of Environment expected characteristics of the untreated/treated effluent

Uploaded

26. Fuel consumption

Fuel Type UOM Fuel Consumption TPD/LKD Calorific valueBagasse MT/Day 2160 2200

Ash content Sulphur content Quantity Other (specify)1.5 0.05 1 NA

27. (a) Details of stack (process & fuel stacks: D. G. )

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type1 Boiler 20 Bagasse

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

10000 RCC Round 60

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature ℃ (l) Exit gas velocity, m/sec.4.0 15000 154 1.5

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

Wet Scrubber SPM Wet Scrubber 1500 (750+750)

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type1 Boiler 20 Bagasse

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

10000 RCC Round 60

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature ℃ (l) Exit gas velocity, m/sec.

358

4.0 24000 154 1.5

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

Wet Scrubber SPM Wet Scrubber 00

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type1 Boiler 35 Bagasse

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

17500 RCC Round 60

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature ℃ (l) Exit gas velocity, m/sec.4.0 24000 154 1.5

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

Wet Scrubber SPM ESP 00

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type2 Boiler 70 Bagasse

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

35000 RCC Round 76

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature ℃ (l) Exit gas velocity, m/sec.4.2 45000 152 1.8

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ESP SPM ESP 00

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type2 Bioler 35 Bagasse

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

17500 RCC Round 76

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature ℃ (l) Exit gas velocity, m/sec.4.2 28000 154 1.5

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ESP SPM ESP 00

27. (B) Whether any release of odoriferous compounds such as Mercaptans, Phorate etc. Are coming out from any storages or processhouse.

NA

28. Do you have adequate facility for collection of samples of emissions in the form of port holes, platform, ladder\etc. As per CentralBoard Publication “Emission regulations Part-III” ( December, 1985 )

Poart hole Yes Details 2 NOS

359

Platform Yes Details Provided at 26 Mtrs.

Ladder Yes Details Monkey Ladder

29. Quality of treated flue gas emissions and process emissions. Quantity of treated flue gas emissionsand process emissions.

Sr.No.

Stack attached to Parameter Concentration mg/Nm3 flow (Nm3/hr)

1 Boiler SPM 140 10

(Specify concentration of criteria pollutants and industry/process-specific pollutants stack-wise. Enclosea copy of the latest report of analysis from the laboratory approved by State Board/Central Board/Central Government in the Ministry of Environment & Forests. For proposed unit furnish expectedcharacteristics of the emissions..

NA

Part - D: Hazardous Waste aspect

30. Information about Hazardous Waste Management as defined in Hazardous Waste (Management & Handling ) Rules, 1989 asamended in Jan.,2000. Type/Category of Waste as per

Waste (Annually) Schedule ICat No Type Qty UOM5.1 5.1 Used or spent oil 300 Kg/M

Max Method of collection Method of reception Method of storageMechanical Oil Skimmer Collected in Barell In Barrel

Method of transport Method of treatment Method of disposal Own Vehicle inside factory area Collection & Storage Mixed with bagasse & used as

fuel for Boiler

Waste (Annually) Schedule II31. Details about use of hazardous waste

Name of hazardouswaste/Spent chemical

Quantity used/month Party from whom purchased Party to whom sold

NA 0 NA NA

32.

a. Details about technical capability and equipments available with the applicant to handle the Hazardous WasteYES

b. Characteristics of hazardous waste(s) Specify concentration of relevant pollutants. Enclose a copy of the latest reportof analysis from the laboratory approved by State Board/Central Board/Central Govt. in the ministry of Environment &Forests. For proposed units furnish expected characteristicsNA

33.

Copy of format of manifest/record Keeping practiced by the applicant.NA

34.

Details of self-monitoring (source and environment system)YES

360

35.

Are you using any imported hazardous waste. If yes, give details.NA

36.

Copy of actual user Registration/certificate obtained from State Pollution Control Board/Ministry of Environment &Forests, Government of India, for use of hazardous waste.NA

37.

Present treatment of hazardous waste, if any (give type and capacity of treatment units)NA

38. Quantity of hazardous waste disposal

(i) Within factory300

(ii) Outside the factory (specify location and enclose copies of agreement.)0

(iii) Through sale (enclosed documentary proof and copies of agreement.)0

(iv) Outside state/Union Territory, if yes particulars of (1 & 3 ) above.0

(v) Other (Specify)0

Part - E: Additional information

39.

a. Do you have any proposals to upgrade the present system for treatment and disposal of effluent/emissions and/orhazardous waste.NO

b. If yes, give the details with time- schedule for the implementation and approximate expenditure to be incurred on it.NA

40.

Capital and recurring (O & M) expenditure on various aspect of environment protection such as effluent, emission,hazardous waste, solid waste, tree- plantation, monitoring, data acquisition etc. (give figures separately for itemsimplemented/to be implemented).750000

41.

To which of the pollution control equipment, separate meters for recording consumption of electric energy are installed ?Air Blower pump

42.

361

Which of the pollution control items are connected to D.G. Set (captive power source) to ensure their running in theevent of normal power failureAir Blower

43. Nature, quantity and method of disposal of non- hazardous solid waste generated separately from the process of manufacture and waste treatment.(Give details of area/capacity available in applicant’s land)

Type Quantity UOM Treatment Disposal Other DetailsETP Sludge 200 Kg/Day Collection & Storage Manure NA

Boiler ASh 15 MT/Day Collection & Sale Sale to Shareholder NA

44. Hazardous Chemicals – Give details of Chemicals and quantities handled and Stored.

(i) Is the unit a Majot Accident Hazard unit as per Mfg.Storage Import Hazardous Chemicals Rules ?NA

(ii) Is the unit an isolated storage as defined under the MSIHC Rules ?NA

(iii) Indicate status of compliance of Rules 5,7,10,11,12,13 and 18 of the MSIHC Rules.NA

(iv) Has approval of site been obtained from the concerned authority?NA

(v) Has the unit prepared an off-site Emergency Plan? Is it updated ?YES

(vi) Has information on imports of Chemicals been provided to the concerned authority?NA

(vii) Does the unit possess a policy under the PLI Act?YES

45. Brief details of tree plantation/green belt development within applicant’s premises ( in hectors )

Open Space Availability Plantation Done On Number of Trees Planted12000 Square meter 8500 Square meter(71 %) 8000

46.

Information of schemes for waste Minimization, resource recovery and recycling - implemented and to be implemented,separately.YES

47.

(a) The applicant shall indicate whether Industry comes under Public Hearing, if so, the relevant documents such as EIA,EMP, Risk Analysis etc. shall be submitted, if so, the relevant documents enclosed shall be indicated accordingly.YES

(b) Any other additional information that the applicants desires to giveYES

(c) Whether Environmental Statement submitted ? If submitted, give date of submission.SEP 2020

48.

I/We further declare that the information furnished above is correct to the best of my/our knowledge.

49.

362

I/We hereby submit that in case of any change from what is stated in this application in respect of raw materials,products, process of manufacture andtreatment and/or disposal of effluent, emission, hazardous wastes etc. In quality and quantity; a fresh application forConsent/Authorization shall be made anduntil the grant of fresh Consent/Authorization no change shall be made.

50.

I/We undertake to furnish any other information within one month of its being called by the Board

Yours faithfullySignature :Name :Designation :

Additional Information

Air Pollution

Sr No. Air Pollution Source Pollutants APCS Provided Remark1 Boiler SPM ESP & Wet Scrubber NA

Separate EM Provided Yes Other Emission Sources NA

Measures Proposed NA Foul Smell Coming Out No

Air Sampling Facility Details Yes

D.G. Set Details

Description Capacity(KVA) RemarksDG Set 750 NA

DG Set 750 NA

Hazardous Waste Generation

Hazardous Waste Quantity UOM Treatment Disposal Other Details5.1 Used or spent oil 300 Kg/M Collection MIxed with Bagasse &

burnt as fuel in boilerNA

CHWTSDF Details

Member of CHWTSDF CHWTSDF Name Remarks

Cess Details

Cess Applicable Cess Paid If Yes, UpToNo No May 11 2021 12:00:00:000AM

Legal Actions

LegalActionTaken

Legal Record Of Company Legal Action Details Remarks

No

363

Application for Consent/ Authorisation

Sir,I/We hereby apply for*

1. Consent to Establish/Operate/Renewal of consent under section 25 and 26 of the Water (Prevention & Control of Pollution) Act, 1974 asamended.

2. Consent to Establish/Operate/Renewal of consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981, asamended.

3. Authorization/renewal of authorization under Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 inconnection with my/our/existing/proposed/altered/ additional manufacturing/processing activity from the premises as per the details givenbelow.

Consent Information

UAN No: Application submitted on:MPCB-CONSENT-0000094643 12-07-2020

Industry Information

Consent To: IIN No.: Submit to:Renewal (Normal) SRO - Pune I

Type of institution: Industry Type: Category: Scale:Industry R12 Sugar ( excluding

Khandsari)Red L.S.I

EC Reqd. EC Obtained EC Ref. No.No No -

Whether construction-buildup area is more than 20,000sq.mtr.(Existing Expansion Unit)

No

General Information

1. Name, designation, office address with Telephone/Fax numbers, e-mail of the Applicant Occupier/Industry/Institution / Local Body.

Name AddressGOVIND MAHADEV ANARSE atpost-bhavaninagar taluka-indapur dist-pune

Designation TalukaMANAGING DIRECTOR INDAPUR

Area DistrictBHAVANINAGAR Pune

Telephone Fax9075658383 02118266253

Email Pan [email protected] AAAAS3869G

364

2. (a) Name and location of the industrial unit/premises for which the application is made (Give revenue Survey Number/Plot numbername of Taluka and District, also telephone and fax number)

Industry nameShri Chhatrapati Sahakari Sakhar Ltd. Bhavaninagar Tal -Indapur Dist-Pune.

Location of Unit Survey number/Plot NumberBhavaninagar T 122

Taluka DistrictIndapur Pune

(b) Details of the planning permission obtained from the local body/Town and Country Planning authority/Metropolitan Developmentauthority/ designated Authority.

Planning permission Planning AuthorityGrampanchayat Sansar Grampanchayat Sansar

Name of the local body under whose jurisdiction the unit is located and Name of the licence issuing authority

Name of Local Body Name of the licence issuing authorityGrampanchayat Sansar Govt Maharashtra

3. Names,addresses with Telephone and Fax Number of Managing Director / Managing Partner and officer responsible for mattersconnected with pollution control and/or Hazardous waste disposal.

Name of Managing Director Telephone numberGovind Mahadeo Anarase 02118266231

Fax number Officer responsible for day to day business02112 266253 Managing Director

4. (a.) Are you registered Industrial unit ? Yes

Registration number Date of registrationG/269 06/08/1955 May 5, 1955

5. Gross capital investment of the unit without depreciation till the date of application (Cost of building, land, plant and machinery). (Tobe supported by an affidavit/undertaking on Rs.20/- stamp paper, annual report or certificate from a Chartered Accountant for proposedunit(s), give estimated figure)

Gross capital (in Lakh) * Verified * Terms * Consent Fee22336.07 CA Certificate 1 446721.00

6. If the site is located near sea-shore/river bank/other water bodies/Highway, Indicate the crow fly distance and the name of the waterbody, if any.

Distance From Distance(Km) * NameSH/NH 0.00 --NA--

River 0.00 Nira

Human Habitation 0.00 --NA--

Religious Place 0.00 --NA--

Historical Place 0.00 --NA--

Creek/Sea 0.00 --NA--

6b. Enter Latitude and Longitude details of site

Latitude Longitude18.1163 74.6831

365

7. Does the location satisfy the Requirements Under relevant Central/State Govt. Notification such as Coastal Regulation Zone.Notification on Ecologically Fragile Area, Industrial Location policy, etc. If so, give details.

Location Approved IndustryArea

Sensitive Area If Yes, Name Of Area Industry Location withReference to CRZ

Bahavani Nagar . No No NA A4

8. If the site is situated in notified industrial estate,

Details(a) Whether effluent collection,treatment and disposal system hasbeen provided by the authority.

No NA

(b) Will the applicant utilize thesystem, if provided.

No NA

(c) If not provided, details of proposedarrangement.

NA

9.

(a) Total plot area (in squear meter) (b) Built up area and (in squear meter) (c) Area available for the use oftreated sewage/ trade effluent forgardening/irrigation. (in squear meter)

24000 12000 23 Hectares

10. Month and year of commissioning of the Unit.

2017-11-14

11. Number of workers and office staff

Workers staff Hrs. of shift Weekly off580 240 08 Sunday

12.

(a) Do you have a residentialcolony Within the premisesin respect of Which thepresent application is Made?

No NA

(b) If yes, please state population stayingNumber of person staying Water consumption Sewage generation Whether is STP provided?

20 16 Yes

(c) Indicate its location and distance with reference to plant site.Number of person staying Water consumptionBhavaninagar 02

13. List of products and by-products Manufactured in tonnes/month, Kl/month or numbers/month with their types i.e.Dyes, drugs etc.(Give figures corresponding to maximum installed production capacity

Products Name and Quantity

ProductName

UOM ProductName

Existing Consented ProposedRevision

Total Remarks

Sugar(excludingKhandsari)

MT/M White CrystalSugar

21695 21695 000 21695 NA

Products Name and Quantity

Product Name UOM Quantity RemarksBagasse MT/M 56970 NA

366

Pressmud MT/M 7970 NA

Molasses MT/M 7970 NA

Electricity MW 18 NA

14. List of raw materials and process chemicals with annual consumption corresponding to above stated production figures, intonnes/month or kl/month or numbers/month.

Name of Raw Material UOM Quantity HazardousWaste

HazardousChemicals

Remarks

Sugar Cane MT/Day 6500 No Yes NA

15. Description of process of manufacture for each of the products showing input, output, quality and quantity of solid, liquid andgaseous wastes, if any from each unit process.

Uploaded

Part B : Waste Water aspects

16. Water consumption for different uses (m3/day)

Purpose Consumption EffluentGeneration

Treatment Remarks Disposal Remarks

Domestic Pourpose 20 16 Septic Tank &Soak Pit

NA On Land forGardening

NA

Water gets Polluted& Pollutants areBiodegradable

484 650 Primary +Secondary +Tertiary

NA On Land forGardening

NA

Water getsPolluted,Pollutantsare notBiodegradable &Toxic

00 00 --NA-- NA --NA-- NA

IndustrialCooling,spraying inmine pits or boilerfeed

125 125 Primary +Secondary

NA On Land forGardening

NA

Others 00

17. Source of water supply, Name of authority granting permission if applicable and quantity permitted.

Source of water supply Name of authority granting permission Qauntity permittedNira Left Canal Sub Divisional Engineer 1000

18. Quantity of waste water (effluent) generated (m3/day)

Domastic Boiler Blowdown Industrial Cooling water blowdown16 125 650 120

Process DM Plants/Softening Washing Tail race discharge from120 140 20 20

* 19. Water budget calculations accounting for difference between water consumption and effluent generated.

Uploaded

20. Present treatment of sewage/canteen effluent (Give sizes/capacities of treatment units).

Capacity of STP (m3/day)

367

120

Treatment unit Size (mxm) Retention time (hr)Soak Pit 54 12

21. Present treatment of trade effluent (Give sizes/capacities of treatment units) (A schematic diagram of the treatment scheme withinlet/outlet characteristics of each unit operation/process is to be provided. Include details of residue Management system (ETP sludges)

Capacity of ETP (m3/day)1000

Treatment unit Size (mxm) Retention time (hr)Screen Chamber 7.2 1

O & G Chamber 34 0.5

O & G collection Tank 1 1

EQT 175 4.0

NT 10 0.25

Surge Tank 216 5

Anaerobic Pond 2640 60

Aeration Tank 812 20

Sec Clarifier 158 4

SDB 10x5x1 6 Nos

MGF Dia 1.8M x Ht 2.4M 0.07

Treated Effluent Collection Tank 5x5x2 1HR

22.

(i) Are sewage and trade effluents mixed together? No

If yes, state at which stage-Whether before, intermittently or after treatment. NA

23. Capacity of treated effluent sump, Guard Pond if any.

Capacity of treated effluent sump (m3) 15000

Effluent sump/Guard pond details No

If yes, state at which stage-Whetherbefore, intermittently or aftertreatment.

No

24. Mode of disposal of treated effluent With respective quantity, m3/day

(i) into stream/river (name ofriver)

NA (ii) into creek/estuary (nameof Creek/estuary)

NA

(iii) into sea NA (iv) into drain/sewer (ownerof sewer)

NA

(v) On land for irrigation onowned land/ase land. Specifycropped area.

48 Acres (vi) Connected to CETP NA

(vii) Quantity of treatedeffluent reused/ recycled,m3/day Provide a locationmap of disposalarrangement indicating theoutler(s) for sampling.Treated effluent reused /recycled (m3/day)

1000

368

25. (a) Quality of untreated/treated effluents (Specify pH and concentration of SS, BOD,COD and specific pollutants relevant to theindustry. TDS to be reported for disposal on land or into stream/river.

Untreated Effluent

pH 5.7

SS (mg/l) 1000

BOD (mg/l) 800

COD (mg/l) 1200

TDS (mg/l) 1400

Specific pollutant ifany

Name Value

1 NA NA

Treated Effluent

pH 7.8

SS (mg/l) 100

BOD (mg/l) 100

COD (mg/l) 250

TDS (mg/l) 100

Specific pollutant ifany

Name Value

1 NA NA

(b) Enclose a copy of the latest report of analysis from the laboratory approved by State Board/ Committee/Central Board/CentralGovernment in the Ministry of Environment expected characteristics of the untreated/treated effluent

Uploaded

26. Fuel consumption

Fuel Type UOM Fuel Consumption TPD/LKD Calorific valueBagasse MT/Day 2160 2200

Ash content Sulphur content Quantity Other (specify)1.5 0.05 1 NA

27. (a) Details of stack (process & fuel stacks: D. G. )

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type1 Boiler 20 Bagasse

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

10000 RCC Round 60

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature ℃ (l) Exit gas velocity, m/sec.4.0 15000 154 1.5

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

Wet Scrubber SPM Wet Scrubber 1500 (750+750)

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type1 Boiler 20 Bagasse

369

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

10000 RCC Round 60

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature ℃ (l) Exit gas velocity, m/sec.4.0 15000 152 1.5

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

Wet Scrubber SPM Wet Scrubber 00

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type1 Boiler 35 Bagasse

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

17500 RCC Round 60

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature ℃ (l) Exit gas velocity, m/sec.4.0 24000 154 1.5

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

Wet Scrubber SPM Wet Scrubber 00

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type2 Boiler 70 Bagasse

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

35000 RCC Round 76

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature ℃ (l) Exit gas velocity, m/sec.4.2 45000 152 1.8

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ESP SPM ESP 0

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type2 Boiler 35 Bagasse

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

17500 RCC Round 76

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature ℃ (l) Exit gas velocity, m/sec.4.2 28000 154 1.5

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ESP SPM ESP 00

27. (B) Whether any release of odoriferous compounds such as Mercaptans, Phorate etc. Are coming out from any storages or processhouse.

NA

370

28. Do you have adequate facility for collection of samples of emissions in the form of port holes, platform, ladder\etc. As per CentralBoard Publication “Emission regulations Part-III” ( December, 1985 )

Poart hole Yes Details 2 Nos

Platform Yes Details Provided at 26 Mtrs

Ladder Yes Details Monkey Ladder

29. Quality of treated flue gas emissions and process emissions. Quantity of treated flue gas emissionsand process emissions.

Sr.No.

Stack attached to Parameter Concentration mg/Nm3 flow (Nm3/hr)

1 Boiler SPM 140 10

(Specify concentration of criteria pollutants and industry/process-specific pollutants stack-wise. Enclosea copy of the latest report of analysis from the laboratory approved by State Board/Central Board/Central Government in the Ministry of Environment & Forests. For proposed unit furnish expectedcharacteristics of the emissions..

NA

Part - D: Hazardous Waste aspect

30. Information about Hazardous Waste Management as defined in Hazardous Waste (Management & Handling ) Rules, 1989 asamended in Jan.,2000. Type/Category of Waste as per

Waste (Annually) Schedule ICat No Type Qty UOM5.1 5.1 Used or spent oil 300 Kg/M

Max Method of collection Method of reception Method of storageMechanical Oil SKimmer Collected In Barrel In Barrel

Method of transport Method of treatment Method of disposal Own Vehicle Inside Factory Area Collection & Storage Mixed in Bagasse & used as fuel

for Boiler

Waste (Annually) Schedule II31. Details about use of hazardous waste

Name of hazardouswaste/Spent chemical

Quantity used/month Party from whom purchased Party to whom sold

NA 0 NA NA

32.

a. Details about technical capability and equipments available with the applicant to handle the Hazardous WasteYes

b. Characteristics of hazardous waste(s) Specify concentration of relevant pollutants. Enclose a copy of the latest reportof analysis from the laboratory approved by State Board/Central Board/Central Govt. in the ministry of Environment &Forests. For proposed units furnish expected characteristicsNA

33.

Copy of format of manifest/record Keeping practiced by the applicant.NA

34.

371

Details of self-monitoring (source and environment system)Yes

35.

Are you using any imported hazardous waste. If yes, give details.NA

36.

Copy of actual user Registration/certificate obtained from State Pollution Control Board/Ministry of Environment &Forests, Government of India, for use of hazardous waste.NA

37.

Present treatment of hazardous waste, if any (give type and capacity of treatment units)NA

38. Quantity of hazardous waste disposal

(i) Within factory300

(ii) Outside the factory (specify location and enclose copies of agreement.)0

(iii) Through sale (enclosed documentary proof and copies of agreement.)0

(iv) Outside state/Union Territory, if yes particulars of (1 & 3 ) above.0

(v) Other (Specify)0

Part - E: Additional information

39.

a. Do you have any proposals to upgrade the present system for treatment and disposal of effluent/emissions and/orhazardous waste.No

b. If yes, give the details with time- schedule for the implementation and approximate expenditure to be incurred on it.NA

40.

Capital and recurring (O & M) expenditure on various aspect of environment protection such as effluent, emission,hazardous waste, solid waste, tree- plantation, monitoring, data acquisition etc. (give figures separately for itemsimplemented/to be implemented).750000

41.

To which of the pollution control equipment, separate meters for recording consumption of electric energy are installed ?Air Blower Pumps

372

42.

Which of the pollution control items are connected to D.G. Set (captive power source) to ensure their running in theevent of normal power failureAir Blower

43. Nature, quantity and method of disposal of non- hazardous solid waste generated separately from the process of manufacture and waste treatment.(Give details of area/capacity available in applicant’s land)

Type Quantity UOM Treatment Disposal Other DetailsETP sludge 200 Kg/Day Collection & Storage Manure NA

Boiler Ash 15 MT/M Collection & Sale Sold to Shareholders NA

44. Hazardous Chemicals – Give details of Chemicals and quantities handled and Stored.

(i) Is the unit a Majot Accident Hazard unit as per Mfg.Storage Import Hazardous Chemicals Rules ?NA

(ii) Is the unit an isolated storage as defined under the MSIHC Rules ?NA

(iii) Indicate status of compliance of Rules 5,7,10,11,12,13 and 18 of the MSIHC Rules.NA

(iv) Has approval of site been obtained from the concerned authority?NA

(v) Has the unit prepared an off-site Emergency Plan? Is it updated ?Yes

(vi) Has information on imports of Chemicals been provided to the concerned authority?NA

(vii) Does the unit possess a policy under the PLI Act?Yes

45. Brief details of tree plantation/green belt development within applicant’s premises ( in hectors )

Open Space Availability Plantation Done On Number of Trees Planted12000 Square meter 8000 Square meter(67 %) 8000

46.

Information of schemes for waste Minimization, resource recovery and recycling - implemented and to be implemented,separately.Yes

47.

(a) The applicant shall indicate whether Industry comes under Public Hearing, if so, the relevant documents such as EIA,EMP, Risk Analysis etc. shall be submitted, if so, the relevant documents enclosed shall be indicated accordingly.Yes

(b) Any other additional information that the applicants desires to giveYes

(c) Whether Environmental Statement submitted ? If submitted, give date of submission.Sept 2019

48.

I/We further declare that the information furnished above is correct to the best of my/our knowledge.

373

49.

I/We hereby submit that in case of any change from what is stated in this application in respect of raw materials,products, process of manufacture andtreatment and/or disposal of effluent, emission, hazardous wastes etc. In quality and quantity; a fresh application forConsent/Authorization shall be made anduntil the grant of fresh Consent/Authorization no change shall be made.

50.

I/We undertake to furnish any other information within one month of its being called by the Board

Yours faithfullySignature : Govind Mahadeo AnaraseName : Govind Mahadeo AnaraseDesignation : Managing Director

Additional Information

Air Pollution

Sr No. Air Pollution Source Pollutants APCS Provided Remark1 Boiler SPM Wet Scrubber & ESP NA

Separate EM Provided Yes Other Emission Sources NA

Measures Proposed NA Foul Smell Coming Out No

Air Sampling Facility Details Yes

D.G. Set Details

Description Capacity(KVA) RemarksDG set 750 NA

DG Set 750 NA

Hazardous Waste Generation

Hazardous Waste Quantity UOM Treatment Disposal Other Details5.1 Used /spent oil 300 Kg/M Collection Mixed in Bagasse NA

CHWTSDF Details

Member of CHWTSDF CHWTSDF Name Remarks

Cess Details

Cess Applicable Cess Paid If Yes, UpToNo No Jan 1 1900 12:00:00:000AM

Legal Actions

LegalActionTaken

Legal Record Of Company Legal Action Details Remarks

374

DETAILS REG BOILER STACK- Stack No.01 Common For Boiler No 1,2 & 3(20,20 & 35 TPH) Stack No.2 Common

for Boiler No 4 & 5 (70 & 35 TPH) Remarks

SHRI CHHATRAPATI SAHAKARI SAKHAR KARKHANA LTD, BHAVANINAGAR

Taluka – Indapur Dist pune 413104

ANNEXURE -III

To, THE SUB-RIGIONAL OFFICER

MAHARASTRA POLLUTION CONTROL BOARD

Pune- I

Sub- Details information of Stacks

B) Stack – 03 Details of DG set (750 KVA -02 Nos)

DG set Description Fuel Type UOM Fuel Consumption

1. Make – Sterling Generators Ltd, Genset Model – SGP- 750 PR, Noise limit -<75 DB (A)At 1 mtr;)

2. Make- Sterling Generators Ltd Engine Sr. No. 105298Alt. Sr,no.LFS3LXJ199860 Power Factor – 0.8 Rated KVA - 750 Rated KW - 600 Full Load Current(0.8pf) Amps– 1043.4 Rated Voltage, - Voltage – 415 V Frequency, Hz – 50 Rated RPM – 4500 RPM Battery Voltage – VDC – 24 VDC Panel type – DSE-7320

Diesel Ltrs /Hr 120

Air Pollution Aspects:

Fuel consumption:

Fuel Type UOM Fuel Consumption Calorific

value

Ash content(%) Sulphur

content

Other

(specify)

Bagasse MT/Day 2160 2250 1.5 0.1 NA

Details of stack (process & fuel stacks: D. G. ):

(a) Stack number(s) (b) Attached

to

(c) Capacity (TPH) (d) Fuel

Type

(e) Fuel

quantity (Kg/hr.)

(f) Material of

construction

02 BOILER

1. Boiler 20,20 & 35TPH havingcommon Chimneywith 60 mtr height( Stack -1)

2. Boiler 70 & 35 TPH

having CommonChimney with 76

mtr height (Stack -

2)

BAGASSE 90000 RCC

(g) Shape

(round/rectangular)

(h) Height, m

(above

ground level)

(i) Diameter/Size, in

meters

(j) Gas

quantity,

Nm3/hr.

(k) Gas

temperature ℃

(l) Exit gas velocity,

m/sec.

ROUND 60 & 76 Mtrs

each 4.0 & 4.2 mtrs ID 125000 154 1.54

(m) Control equipment

preceding the stack

(n) Nature of pollutants likely to

present in stack gases such as CI2,

Nox, Sox TPM etc.

(o) Emissions control system

provided

(p) In case of D.G. Set

power generation

capacity in KVA

Wet Scrubber & ESP

provided SPM Yes Wet Scrubber & ESP provided 750 KVA- 02 nos.

T.C.

375

CODE NO

n• 0 ? j B • L. n• L. • j 2 • ~ • 0 • 1:

Ax. R11

T.C.

376

l

GOVERNMENT OF MAHARASHTRA · ' WATERRESOURCES DEPARTMENT

Pune Irrigation Circle, Pune-11

Pune Irrigation Division, Pune-1

THE AGREEMENT

~ .... WITH

Shri.ChhatrapatiSahakariSakharKarkhana Ltd. Bhavaninagar Tal-lndapur, Dist-Pune.

Date :- I /2018.

I

377

' • I

'

AX 696032

" /"' . I I •.,.

6' .. .,1 ~ . 9 HAR .. .~~

AGREEMENT I FOR NON-IRRIGATION WATER SUPPL Yl

AA Agr~ment made on the 111 day of Augu~t Two Thousand Eighteen between The ~ Mfnaging Director, Shri. Chhalrapall Sahakari Sakhar Karkhana ltd. Bhavaninagar Tal- .

ln8apur Dlst-Pune (Which Expression here-in-after referred to as the company shall, u'ess excluded by or it be repugnant to the context or meaning thereof be deemed to ln!lude its successors and assignees}

I

.-.. ..... - ... .

· .~ Managing Olt»Cfor llfllf.Chh,fnplll S.S.K.Ltd.Bh,van~ug~t,

Ttl.lndapur,DistPune '

.£ ... 8ht.Chhatrapatl S.S.K.Ltd.Bhavaninagar.

Tal.lndapur,Dist.Pune

378

m

ID

'll

AX 696033

REtlatered under the Indian Companies Act, 1913, (VII of 1913) the companies Act, 1956 (1 of 1956) and having Its registered office at Bhavanfnagar. Taf-lndapur Dist­Pule herein after referred to as " the company of the one part and the Governor of Ml\flarashtrS here-In-after referred to as "Government" (Which expression shall unless

J exdtuded by or it be repugnant to .the context or meaning thereof be deemed to lnqlude · · hlSfuccessors and assignees) of the other part

I

Managing Director lfllt.Ch~Ytrapall S.S.K.Ltd.Bhavanlugar,

Tef.Jn_dapur,Oi5t.Pune ·

·,.~tor Stw1.Chhatrapati S.S.I<.Ltd.Bhavaninag.sr.

Tai.lndapur,Dtst.Pune

379

·~ I ( ()IStPtl

R-'.Mo.( ~618119' ~ ~~

. 1 .

Whereas the company is desirous of constructing a pumping station on the co~pany's land at BhavaninagarTal-lndapur Dist-Pune for drawing water from the source NJra Left bank Canal (hereil)after referred ~o as "the said source") for the use by the Karkhana's plant (hereinafter referred to as "the said plant" ) and laying underground and surface

pipes and drains for discharge of the factory effluent.

AND whereas the company has applied to the Government for permission to draw 0.55

million Cubic meter of water per year from the said source.

AND whereas the company has paid Rs.---- (Rs.------------------ only to Government towards the proportional cost of capital outlay of the project.

AND whereas the Government has agreed to grant the aforesaid permission to the company on the terms and condition hereinafter appearing.

AND WHEREAS UNDER the said terms and conditions the company has deposited with the Executive•Engirieer, Pune Irrigation Division, Pune-1 to the Government of Sum of Rs.5,000/- (Rs. Five Thousand only) vide D.D.No.62159 dated 25/09/1997& sum of Rs.95,000/-(Rs, Ninety five thousand only) vide D.D.No.4257 dated 18/1111997 & sum of Rs.1,00,000/- (Rs.One lakh only) Rs.6,88,700/- (Rs. Six lakh Eighty Eight Thousand Seven hundred only) vide D.D.No.459554 dated 14/03/2006 Total Rs.7,88,700/- (Rs. Seven lakh Eighty Eight Thousand Seven hundred only) Rs.3,76,082l-(Rs. Three lakh seventy six thousand eighty two only} vide D.D.No.073814 dated.03/07l2021 as security deposit equivalent to 2 months company's probable water charges based on yearly sanctioned and as communicated in cash or in the form of fixed deposit receipt or a bank guarantee issued by a scheduled/nationalize bank having its mainl branch office situated locally for the due observance and performance by the compan¥ of the terms and conditions of this Agreement AND WHEREAS the company has accordingly prior to the execution of these presents deposited with the Government Rs.3, 76,0821- (Rs. Three lakh seventy six ~housand eighty two only) as security for the due observance and performance- by the company of the terms and conditions herein contained; AND WHEREAS it has been agreed that the said amount will not carry any interest if deposited in cash 3,76,082 for agreement.

Definitions :-Quota - Quota means yearly demand sanctioned and communicated to the company by Executive Engineer.

Corporation :- Corporation means the River Basin corporations like Maharashtra Krishna Valley Development Corporation (MKVDC) Godavari Marathwada Irrigation Development Corporation (GMIDC) Tapi Irrigation Development Corporation ITIDC) Konkan Irrigation Development Corporation (KiDC) and Vidarbha Irrigation Development Corporation (VIDCl Municipal Corporations Municipalities etc.

MIDC :MIDC means Maharashtra Industrial Development Corporation.

MJP :-MJP means Maharashtra Jeevan Pradhikaran.

Yearly Applicable Demand :-Yearly applicable demand means the water demand communicated by the USER for the period 1'1 july to 301

h june the Executive Engineer. and sanctioned by Irrigation Department every year in the month of May along with its bifurcation for Industrial domestic and agricultural use.

-· -

~ror ~Chhatr1pat1 S.S.K.Ud.S~va~

"'-T~~.iflur,Oiat.Pune

380

. 2 .

. d 1 companies users/Industry USER :User means water using agency hke md1v1 ua -Entrepreneur

NOW THIS AGREEMENT WITNESSTH AS FOLLOWS :-

1) (a) In consideration of the company making payment to theGovernme~t. as hereinafter spec1fied and observing and performing the convenience and conditions here m conta1ned Government do hereby grants to the company permiss1on to draw

followmg quota of water for the spec1fied purpose as under

) C' ... ~

}

Sr No~ Descnption/Use Quantity million Liters (M cum)

per year 1 Total Sanction Quota (Yearly) 0.55 M.Cum 1.1 For Industry Using Potable Water Nil

bottling plant 1.2 For other than water as raw material 0.55 M.Cum

Industrial use 1.3 For domestic use Nil 1.4 For agricultural use (Nursery/ Nil

gardening within the company's prem1ses

and use the same for the purpose of the company's said plant or project, for supply to for industrial for a term of Six years commencing from the 1$1 day of August 2018 on the following terms and conditions.

(b) The quota assigned for domestic use and for agricultural use shall not exceed 10% each of the individual water demand in the cases where in the water used for Domestic and Agricultural use exceeds 10% in each case the excess use shall be charged at Industrial applicable rate specified in clause 11 of this agreement.

(c) The Industrial water requirement the Domestic water requirement and agricultural (nursery/gardening) water requirement of the company as demanded deemed to be separate and independent for the sole purpose and water charges assessment shall be accordingly separate and independent for other clauses of this agreement.

2) The permission hereby granted shall be subject to the provisions of the Maharashtra Irrigation Act 1976 and the Bombay Canal Rules 1934 and subsequent revision. If any in force and any executive orders issued in this behalf by Government and any statutory amendment thereof from time to time and for the time being in force.

3) Nothing herein contained shall be deemed to imply any guarantee on the part of the Government as to the availability or otherwise of any specific quantity of water and

Government shall not be responsible for the non-supply or in adequate supply of water on any account wha'tsoever.

However in case of inadequate or non-supply due to shortage of water or reason

beyond the control of the Department, bill shall be charged as per actual quantity of water lifted/supplied during such period.

~~·· etvi.Chhatrapati S.S.K.Ltd.Bhavank\agar, Tzi.ln~apJr,Dist.Pune

" 381

- 3 -

4) The company shall use the water drawn from the said Nira left Bank Canal _for purposes of the company's said plant and for supply to the residential col_omes constructed by the compa,ny within the area of the said Plant for providi~g housl~g to its employees and workers. (hereinafter referred to as "the said residential Col~mes). The company shall not sell the water from the said canal to any other person, firm or company, corporation or other body. In the event of the company selling water dra~m from the said canal, then the Government without prejudice to Its right will forth With revoke the hcense. Government shall be entitled to recover from the company the proceeds of any such sale made by the company.

5) Government shall be entitled to ulllize water of the said canal available after meeting the reasonable requirements of the company: as to which matter the decision of the Government shall be final and binding on the company. for such purpose as Government deems fit.

6) The permission hereby granted shall not in any manner prejudicially affect the

'

existing water rights vested in the upstream riparian owners nor shall it in any way, prejudice Government's right to here after launch or implement in public interest any new scheme or schemes on its own on or in connection with the present source of channel of water supply available to the company Subject however to the safe­guarding of its reasonable demand referred to in clause {5) above.

7) The company shall not construct the pick-up weir in the Nira Left Bank Canal River bed of the said River Canal unless the proposals, plans, drawings, specifications, estimates and all other details there of are previously submitted to and approved in writing by an officer authorised in that behalf by the Government and while granting its approval to the construction of the pick-up weir Government may impose such condition as it may in its discretion think fit .

8) (a) For ascertaining the quantity of water drawn by the company, the company shall forth with at its own cost and after obtaining prior approval in writing there to the Executive Engineer, Pune Irrigation Division, Pune install independent pipeline fitted with separate electronic water measuring devices for use of water for the said independent intention (hereinafter referred to as "the said electronic measuring devices") at such places as indicated by the Executive Engineer. All the pipeline showing locations of the metering equipments from the said source for d1fferent purposes shall be got jointly verified and got approved from Executive Engineer. Irrigation Department.Layout from the said source shall be got approved from the Executive Engineer. No changes in the approved layout shall be made without the prior written approval from the Executive Engineer. In the event of the company failing to install and keep in proper working order the said electronic measuring devices for use of water for the said Plant and supply to the said residential colonies as aforesaid the company shall be liable to pay for the full sanctioned quantity for the period or average use as. per last 6 months which ever is higher will be charged at twice prevailing rates for the said plant.

The said electronic measuring devices shall always be kept under the lock & seal of the Executive Engineer,Pune irrigation division Pune.& the key such lock shall at all times remain with the Executive Engineer ,Pune Irrigation Division Pune. The first party shall at all times during the substance of this agreement at its own cost maintain the said electronic measuring devices in proper working order and condition.

' '" atv1.Chhatrapatl S.S.K.Ltd.Bhavanlugar, ' T~!:!,(l!apur,Oist.Pune

II '

J

~ t

\ I

382

-4 -

(b) Readings for the water so drawn by the company will be taken ~n th~ ~aid electronic measuring devices on the 10th day of each month/at agreed t1mes, JOintly by the authorized representatives of the Executive Engineer pune irrigation division pune and of the company.

(c) if at any time in the opH;uon of the Executive Engineer the said electronic measuring devices are found defective the same shall be tested for its accuracy and the cost of such testing shall be borne and paid by the company if no such testing the said electronic measuring devices are found to be defective the company shall forth with got the same repaired and set right at its own cost and in the event of company failing to do so within 30 (Tihirty) days thereafter the Executive Engineer pune irrigation division pune may proceed to do so on account and at the cost of the company.

(d) In-the event of the said electronic measuring devices going out of order and

~becoming defective the quantity of water drawn by the company during the period when the meter was defective .and not working shall be ascertained in the following

X ~ m,anner. r

(i) If the said electronic measuring devices remain out of order for a period of less than 30 days then the quantity of water deemed to be drawn by the USER during the said period shall be taken to be 100% of the yearly sanctioned demand as communicated in clause No.1(a) or average for the last six months whichever is higher. With 1.5 times of applicable rate

(ii) If the said electronic measuring devices remain out of order for a period exceeding 30 days then the quantity of water deemed to be drawn by the USER during the said period shall be taken to be 100% of the yearly sanctioned demand as communicated in clause 1 (a) or average for the last Six months whichever is higher. With twice the applicable rate. This will be made applicable for the [period during which the measuring devices remained out of order. The aforesaid provisions will also apply when the quantity of water drawn by the company cannot be measured on account or removal of the said electronic measuring devices for r<epairs or the same in the opinion of the Executive Engineer not working properly.

(iii) If electronic meter meant for domestic or for agricultural use is not fitted or remain out of order or is removed the water charges will be divided as per the rates specified for the industrial use for the total quota as referred to in clause 1 (a) of this agreement.

9) Billing should be done on bimonthly basis. The Bill for the water drawn by the company during the previous calendar month shall be sent in duplicate/triplicate by the Executive Engineer to the office of the company within 15 days after the end of the water consumption month. The company shall thereafter duly pay the same by a demand draft drawn for and on behalf of the Executive Engineer, Pune Irrigation Division, Pune for and on behalf of the Government within a fortnight from the date of receipt of the bill and shall not allow the same of fall in arrears. If the company fails to pay the amount within this stipulated time (15 days from the date of receipt of the bill i.e. before the end of the current month) extra charge not exceeding 10% per annum of the amount due will be charged. If the delay in payment of water charges exceeds six months the irrigation department reserves the right to terminate the water supply

with a notice of 15 days in advance. L .. c:f/ ~~rector

Stvi.Chhatrapatl S.S.K.ltd.Bhavaniugar, ... _ Tai.ln~apur,Oist.Pune

I

J ~.

j I

l

I r I

I I ,

:.1 •'

383

. s.

10)The cost of all works in connection with the arrangements for water supply including the cost of measuring devices and its installation and maintenance shall be done by the company.

11) Subject to the provisions of clause (8) hereof the company shall pay to the Government at the time and In the manner specified in clause (12) hereof water charges for the quantity of water drawn by the company from the said canal as measured by the said electronic measuring devices at the following rates namely prescribed as per Govt.(amendment) maharastra water resources regulatory (MWRR's orders) order no-1/2018 dated 11/01/2018 & also as per subsequent revision in the water rates from time to time in the terms of this agreement.(the present water rate for dawn from the said source for industrial use is season Rs.10.56 per cubic applicable for sanctioned quota 0.55M cub per year.)

(i)

(ii)

Provided however that after the expiry of two years from the date of company starts drawing water from the said river if any month the quantity of water drawn· by the company is less than 90% of the quantity of water specified in Clause (i) hereof then the company shall pay to the Government water charges calculated for 90% of the quantity of water specified (1) hereof or for average on the quantity of water drawn by the company during the period of previous three months including the month in question whichever is greater.

For any unforeseen reasons, if the company would like to reduce/ increase the demand of water made earlier/entered in the agreement, they will be required to make the revised annual demand before commencement the year i.e 151 day of july (applicable for the change quota should be submitted to the executive engineer pune irrigation division pune at least 15 days before 111 july for the year.) on acceptance of such revised demand the company will be charged as per changed demand for period specified subject to condition that sanctioned quota minus revised demand will be changed with 5% of current rates applicable as commentment charges of water other conditions remaining same. 1::. New supplementary agreement on hundred rupees stamp paper for the changed quantity which will form part of main agreement.

(iii) No penal rate will be levied for the quantity limited to 15% in excess of the sanctioned quota. For quantity used in excess of the 15% to 40% without prior sanction a penal rate of 50% will be charged over the basic rate. For quantity used in excess of 40% without sanction a penal rate of 100% will be charged over basic rate .The delay in payment on account of this also, will be governed by Clause (9) above.

(iv) For any unforeseen reasons (Such as sudden closure of the units or sudden rise in production etc) there could be abrupt fluctuations in the demand on both sides. Such cases will be decided at Govt. level only. by giving due considerations to the availability or water in the particular sub­basin and so on.

(v) In addition to the payment of water charges referred to above the company shall also pay to the Government local fund cess at the rate of 20 paise per every rupee of basic water charges.

~~~ Stvi.Chhatra.patl S.S.K.Ltd.Bhavanklagar,

Tal.ln_dap:.~r,Dist.Pune

1

'I

384

(vi)

)~

. 6 .

Water Bills ·- T.he bi-moothlv bills for the period from Julv to April (For 10 months) shall be prepared on the basis of actual quantity of water lifted at the prevailjog rate. The bill for the month of May & June (11'h& 12'h month) Shall be prepared bv taking reyfew of annual sanctioned demand and the tenus and conditions of the agreement and then shall be adjusted and paid accordrngly While adjusting so jt shall be considered that the 90% of the annual sanclioned demand has been lj(ted/ used.

The water lifted In excess upto 15% of sanctioned demand shall be charged at single rate and excess above 15% to 40% will be charged at penal rate or 1.50 limes of the normal rate as mentioned in the relevant clause. However the excess use above 40% will be charged at penal rate 2.00 times of normal rate as menlioned m relevant clause. However the local cess shall be charged on single rate only.

12) (a) The company shall pay to the Executive Engineer, Water rates and focal fund cess either in advance every alternate month on the basis of anllcrpated quantum of water to be drawn by it from the said source during the next two month or on monthly basis within fifteen (15) days from the date of receipt of the bimonthly demands by the USER from the Executive Engineer. On dafault of the USER to pay the water rate and/or local fund cess as aforesaid vide clause 9 and 11. Government shall without prejudice to its any other rights and remedies be entitled to terminate this agreement forthwith as per clause No.9

{b) In the case of disputes regarding quantity of water billed or rate at whrch the brll IS

prepared the company shall first pay the complete amount of the bill and then claim for refund of any excess ~ill charged giving the reasons/ justification of wrong brlling. However the decision of Superintending Engineer, Pune Irrigation Circle, Pune rn this regards shall be final and binding on the company.

13) Government hereby reserves the right to revise from time to time the water rates and focal fund cess and company shall pay such the revised water rates and local fund cess as may be fixed by Government from time to time.

14) The USER shall not discharge the effluent in any nalla or river and shall not pollute directly or indirectly any portion of the said nalla/river even by septic tank effluents If any water sources are polluted by any industry as indenlified by lrrigation/Polluoon Control Board/MIDC/MJP the company shall be charged with a penalty of rupees 5000/- per such incident per day till it is rectified. The opinion of Maharashtra Pollution Control Board in respect of degree of pollution will be binding on the company.

The company shall recycle the effluent water for their use such as gardening, recreation, cooling, cleaning, washing and manufacturing process etc. so that at least 20% reduction in consumption of fresh water is achieved.

15) The effluent disposal arrangement made by the company shall be got approved by the company from the Maharashtra Pollution Control Board/ Environmental Department of the Government prior to commencing the operation of pumping/drawing water from the portion.

~ .. , ltw1.Chhatrapatl S.S.K.Ltd.Bhavanlugw,

- , Tal.lndap:.rr,Oist.Pune

-

385

. 7 .

16)The company shall at all the limes allow an officer of Irrigation Department of the Government authonzed m that behalf to respect the said works as well as the accounts and 0Qp1es taken of entries from the records maintained by the company.

17)Any notice or other document to be given to or served upon the company may be g1ven or served on behalf of the Government by the Executive Engineer, Pune lmgation D1vision, Pune and any such nohce or document shall be deemed to have been duly g1ven served upon the company or sent by registered post to the registered company if it is delivered at the registered office of the company or sent by registered post to registered address for the time being of the company.

18)The said sum of Rs.3,76,082/- (Rs. Three lakh seventy six thousand eighty two only) deposited in the form of F.D.R./D.D.No.073814 dated.03/07/2021 the company with the Executive Engineer, Pune Irrigation Division, Pune to the Government as aforesaid shall be held by the Government as security for the due observance and performance by the company of the covenants, terms and conditions herein contained. In case of default on the part of the company to perform and observe any of the said covenants term and condition it shall be lawful for the Government in its absolute discretion to forfeit the whole of the security deposit or any part thereof without prejudice nevertheless to any rights and remedies which the Government may have against the company under these presents such breach and the company shall forth with pay up the amount so forfeited and shall always maintain the original amount of deposit throughout the period of this agreement on the expiry of the terms th1s agreement., the said security deposit of Rs .. 3,76,082/- (Rs. Three lakh seventy six thousand eighty two only)or such part there of shall not have been appropriated as aforesaid shall be refunded to the company.

19)AII amounts due to the Government by the company under this agreement shall deemed to be arrears of land revenue and may without prejudice to any other rights and remedies of the Government be recovered from the company (as procedure of the recovery) as arrears of land revenue.

20)0n the expiry of the terms of this agreement Government may renew the agreement within 90 days for such further period and on such terms and conditions, as Government may at its absolute discretion deem fit.

21)The costs incurred in the execution of the incidental charges for the agreement including stamp·duty shall be borne and paid by company.

22)Permission for extra water over and above the sanctioned quota will be granted only

when the written permission for expansion etc is produced by the company from the

industrial department.

23)The Agreement super cedes all the previous agreements entered into by the USER with the Government in connection with the supply of water from said source.

24)The company should submit their water indent for every rotation to the Executive

Engineer, Pune Irrigation Division, Pune on or before starting of the rotation where

the source is located on canal. The company should also furnish the exact quantity of water actually drawn in each rotation after completion of the rotation.

,,

~~ ...... - _ _...!_ ..

--~tv~ , _,. MWrlafng Director

art.Chhatrlpatl S .S.K.UdBhav:an~ · ~ " Tal. ln<tap;.~r,Oist.Punc

' I . I

<

386

- 8 -

. • ost for adequate storage 25)The company will have to make an arrangement at1t sown c

(Balancmg Tank) of not less than two months requirement of water in case or perenmal canal. f1ve months requirement in case or 8 montl1ly canal system. Four months reqUirement 1n case of water source from seasonal river/nalla and one month water requirement in case or perennial water source or river/nalla so as to take care of the closer period so as to take care of the closure period . But If unexpect~d the closure period is increased by more than the special period stipulated here1n the company will have to make an altemallve arrangement for its water requirement at Us

own cost.

26)1F THE COMPANY COMMITS A BREACH OF ANY OF THE TERMS AND CONDITONS THEREOF GOVERNMENT SHALL BE ENTITLED TO CANCEL THIS PERMISSION AND DISCOUNTINUE THE SUPPLY OF WATER WITHOUT PAYMENT OF ANY COMPENSATION WHATSOEVER TO THE COMPANY.

27) The all condition are applicable as per-

(a) Government Of Maharashtra's Maharashtra water resources regulatory authority

~WRRA's order) Order no. 1 12018. Dated - 11.01 .2018

Government Of Maharashtra's G.R.No. Nl Est!. 2017/ (15gf17) Irrigation

anagement (Dhoran) Mantralay,Mumbai-400032, Dated- 10.10.201 7

(c) Ch1ef Engineer, Irrigation Department's Dnyapan CE(ID)(154/2016)

PBS/4989/Dated 23.11.20.17

28)The Govt. hereby reserves to itself its right to change /amend /modify /cancel/revise any of the terms and conditions rules and regulations of water management and Maharashtra Irrigation Act and rules laid under them which shall be applicable for this agreement

29) "Maharashtra water resources regulatory authority act 2005 has empowered the authority to determine the criteria for distribution of entitlements by the river basin agencies on prescribed terms and conditions and also to establish water tariff system. as per the said act, the entitlement and tariff system is subject to review at intervals of not less than three year's, during the agreement period, changes in entitlement and/or prescribed terms and conditions and/or tariff system made by MWRRA shall be binding on both parties.·

~ .. , 3tvf.Chhatrapatl S.S.K.Lid.Bhavaniugas,

Tai.lndapur,Dist.Pune

387

. 9 .

IN WITNESS WHEREOF THE common seal of Ltd. Bhavaninagar Tal-lndapur, Dist-Pune Shri.ChhtrapatiSahakanSakharKarkhana

has been hereinto affixed. The Executive Engineer, Pune Irrigation Divis1on, Pune ha Governor of Maharashtra hereto set his hand and affixed and year first herein above written The common seal of

tlf of the ce the day

Karkhanaltd.Bhavaninagar Tal-lndapur, Dist-Pune

Shri.ChhatrapatiSahakariSakhar Karkhanaltd. Bhavaninagar Tal-lndapur, Dist-Pune

Was pursuant to a resolution of the Board of Directors of the company dated Hereto affixed in the presence of

1~ S/vr; A"'o I Ht">e.JrA(] Pa.J-1 I (vIce. c.h<..lv"'4')

2.

Two Directors oft e company who in token thereof have hereto set their respective hands in the prese ce of

In the presence of

1.

2. Ass is Baramat

aJA.. ngineer Gr.1

igation Sub-Division Baramati

I

388

... ~~ CJ0'1 qrecjurt fb1W1. CJO'l . ~ . ~lt'l d !l.o.J2-

lfl.~~i 1 1 t,\i:i '!I'll . • ~n."&?ftrtfl 'Httrm.fl mcH ililnrrAT.

LJ & & Jt 11Clt4'1 '1• t ~ . ol .:j<n~ ~ .'ju).

•:'i{i(i_:!:.:.:..-- --- . - - ~; fcl1R~l\:A ani:l)ftln; Ifill!) tfllf~l~n ilT·<H·IfllJIU ~J< M)</1(111

~ ·,,

·----- - - iliXll) i11iltl .

~. ~ ~ ~mR mmm:n fc;T .mw-fl';rrR m .~~ ~:'I)QTOft tm~Ffilhfl mJ \J!!Fr~ '"Hlfl. ~)~ i:tml<nr.fl 3T~.<tRPli·fl qre-dur~ Utrfll,rrrr.~

ttl .~)~ trn vn.m. Rl~/'lt'l'l~.~o/(!1/~o'l~

Fcl<i'Liir<Po ~ft ~. rrnq~ m;<~>T.fl nrorv llim!lAT f<:l. ~ ';fTR' m. ~ Ri!.~ m ~ ~ <nr~ ~ qrq~r~11tl if>l<l'ifq'6cft O.ljlj Gt1"Ef1fl/~ tfJ11fl \'JiH'!DtiJfl ~ liTC<'l' ~ ~. ~ m$:11 f.rTR Mi4'1J'i'4r tllfl'11 ""11~ 4>U<'1r"'r ~ arrffiiT ~. ~ ~ f. cr$ft ~.'llj. ~ ~oq~ *ft ti4&1j~ ~ ~ <t>'<l'<"' l'il . jo::ft<t>'<Oifll<fl OllR ~· ~ ~ &Tt. \'J4f<l'lPrro'J .~ lf'.:i w.~ 3RI1) m ~ ~ 4hl0<ll t11cft ~ ~ant . ... ~ <t>U<"'I'idiT~ ~ ~ ~ ~ 41ofllo;qlo ~ ~. arehurta .

• • ~ <1>~1'<'11"<110'1(1 3ltlll ~ ~ lfiW'r cp~o'l '1)

\ \\\\ . _!!Eij<t>H<!> mfta ID ~ f. ~ ~ !!:?04)~ . ~ ~ ClRi1 ~'$1;;;0 <> -

v

~)

~)

.. It)

~ . · 'ffifii · lfrnlt~ 1f«ui · ~ mrrcm • · (~ ~ 4'fl Sf"'TV)) R"11f17T4"'51{~ . ~'1/'l~/~Ool) ~ SlJ1<l ~ If) ftrwlm ~ C7R'VliTO m'!) tm

·· .. ~ <it.l"'llil~ <!> ~ . • 1

~· ~ ~ ~O'!.lrl ~ ~ 311<1Sf'(Dt)<tl (?JR'A ·: f.!wrr SI""'TD)) tzr"q:,<fl ~ ~ m <lllt'lll<!>~ ;·:. Fcl'11Fcl<"ill '\ifln <t'Ri'! m ~ (fll'iwrm) ~ ~ :: C7R'VliTO me) .

~ ?1>~ 1 '<'11"11. srn :l ..-r---- , ... \

'(tl:(Ci6Rcflci~<!>l .¥ :'lltift mfl 3R) ·' ·'

. ······ - ·- -- ";. '

¢,., ~.Chhiltr~paU S.S.K.Ltd.Bhavanillagar,

Ta•:ln.E,apur,Disi.Pune

This marathi letter is received from the concern department which attached as a part of document. We are not going to reply or depend on its content and also it is not part of out argument or grounds of argument.

389

~ Maharashtra Pollution Control Board ~ 5fec253fa11 ad13abfaaef47

MAHARASHTRA POLLUTION CONTROL BOARD Tel: 24010706/24010437 fax: 24023516 Website: hnp:J/mpcb.gov.ln Email: cac..:[email protected]

Klllpataru Point, 2nd and 4th noor, Opp. Clno Plonot Clnoma, Noor Slon Circle, Slon lEI, Mumbal·400022

No:- Formatl.O/CAC/UAN No.MPCB­CONSENT·0000094643/CR - 2¢\2.o0\3S"O To, Shrl Chhatrapatl Sahakarl Sakhar Ltd. 12Z,Bhav<~nlnagar Tal · lndapur Dlst·Puno.

Sub: Renewal of Consent for 6500 TCO & 18 MW MW Co·gen unit Under l .S. I REO Category

Ref: 1. Renewal of Consent granted by the Soard vide No. CAC/ UAN NO. MPCBCONSENT·0000073543/C0·2007000691 dtd. 10.07.2020.

2. Minutes of CAC Meeting dtd. 13.11.2020.

Your application No.MPCB·CONSENT-0000094643 Dated 10.09.2020 For. grant of Consent to Renewal under Section 26 of the Water (Prevention & Control of Pollution) Act. 1974 & under Section 21 of the Air (Prevention & Control of Pollution) Act, 1981 and Authorization under Rule 6 of the-Hazardous & Other Wastes (Management & Transboundary Movement) Rules 2016-ls. considered and the consent Is hereby granted subject to the following terms anti conditions and as detailed In the schedule I, II, Ill & IV annexed to this order. '. ...., 1. The Consent to Renewal Is granieil1'uJ)1ti!ii.o7.2021 2. The cilpltal Investment of the•:t~ii!istry is Rs.223.3607 Crs. (As per C.A

Certificate submitted by industry). 3. Consent Is valfd for the manufadure of:

SrNo Product MaKimum Quantity UOM

1 White Crystal Sugar 21695 MT/t~

2 Bagasse 56970 MT/M

3 Press mud 7970 MT/M

4 Molasses 7970 MT/M

5 Electricity 18 MW

(The cane crushing capclty of Sugar Industry shilll not exceed 6500 TCD.)

4. Conditions under Water (P&CP) Act, 1974 for discharge of effluent:

Plgo I olll

Kindly verify Maharashtra Pollution Control Board's document on Blockchain by scanning the OR code. htlpsJ/blockchain.ecmpcb.in/docs/5818dOb051c8e3a193a225e498482625999d34c8bOc09ce6676e09ec26081af2

l~:~., Sfv1.Chhatrapatl S.S.K.Ltd.Bhavanll.lgar

Tai:l~apur, Dlst.Pune '

390

c

Maharashtra Pollution Control Board 5fec253fa11 ad13abfaaef47

7. Conditions under Hazardous & Other Wastes (M & T M) Rules 2008 for treatment and disposal of hazardous wu tc:

The appllcant shall ensure disposal to the Actual user having permissions under Rule 9 of Hazardous and other Waste (M 6r TMI ~~les, 2016.

a. The applicant shall properly collect, transRQrt 6r regularly dispose of the hazardous waste to CHWTSOF. In compliance of 1he Hazardous 6r Other Wastes (Management & Transboundry Movement) Rules, 2016 and keep proper manifest thereof.

8. The Board reserves the right to r~~lert. afP.end. suspend, revoke etc. this consent end the same shall be binding on the inl!ustry;:";!' •• i

9. This consent should not be const~ued "a~ exemption from obtaining necessary NOC/permlsslon from any other Government authorities.

10. Industry shall connect online CMS data as per CPCB guidelines to CPCB & MPCB Servers.

11. Industry shall stop produe11on activity voluntarily In case of failure of operation and maintenance of the ETP system as preventive measures.

12. Industry shall extend all existing BGs towards O&M of pollution control systems and towards compliance of the Consent conditions.

13. This consent Is Issued as per the Consent Appraisal Committee meeting dated 13.11.2020.

14. To Improve water economy, PP stlall submit detail water budget along with proposal towards recycling of treated effluent to the maximum extent Including excess condensate Into ttle process to reduce frestlwater consumption, within a period of 3 months with activity bar chart.

COIISIMT~

Kindly ve~ty Mahara~hlra Pollution Control Board's document on Blockchain by scanning the QR code. hltps:/lblocl<chaln.ecmpcb.lnldocs/5818d0b051 c8e3a 193a225e498482625999d34c8b0c09ce6676e09ec26081 af2

~or :lhrf.Chhatrapatl S.S.K.Ltd.Bhavan!Ngar,

• Tai.lndapar,Oist.Pune

"' •

)

391

-~ Maharashtra Pollution Control Board ~~ 5fec253fa11 ad13abfaaef47

lS. The applicant shall make en eppllcallon for rtnewal of the consent 11 le11SI 60 days before the date of the expiry or the conSC!nt.

Received Cons ent fee or ·

Copy to:

For and on behall or the Mehllrashlra Pollution Control Board.

~CVv'P (Asholc Shlngare lAS).

Member Secretary

1. Regional Officer, MPCB. Pune and Sub-Regional Offtcer, MPCB, Pune I • They are directed to ensure the compliance or the consent conditions. 2. Chief Accounts Offtcer. MPCB.Sion, Mumbal 3. CC/CAC desk • for record & website updatlon purposes.

--­... f <II

.,., .. f'lgelolll

Kindly verify Maharashtra Pollution Control Board's document on Blockchain by scanning the QR code. hllps://blocl<chain.ecmpcb.in/docs/5818d0b051c8e3a193a225e498482625999d34c8b0c09ce6676e09ec26081af2

lt....... - ·- --·· -

£., ~.Chhatrapatl S.S.K.ltd.Bhavan!Aagar,

~--~ Tal.lndapur,Dist.Pune -

392

Bi Maharashtra Pollution Control Board B 5fec253fa11 ad13abfaaef47

11

SCHEDULE·I Items & conditions fpc comol!ance of Water Pollution Cpntroll

A) As per your application, you have Provided Effluent Treatment Plant (ETPI of designed capacity of 1000.00 CMD consisting of Primary, Secondary, Tertiary for the treatment of 775.00 CMD Indust ria l effluent

B) Industry shall provide CPU for recycle/reuse of treated effluent.

C) The Appllc.11nt shall operllte t he effluent treatment plant (ETPI to treat the trade effluent so as to achieve the fo llowing s tendards prescribed by the Board or under EP Act, 1986 and Rules made thue under from t ime to t ime, whichever Is s tringent.

D] The treated effluent 650.00 CMD shall be disposed on land for Irrigation on 23.00 hectares of o..;IJ lancl /as per the bilate ral agreement with farmers. In no a ny cue truted/untreated effluent shall find Its way outside the factory premises directly or Indirectly.

E) Industry shall operate Online Continuous Emission Monitoring System (OCEMS) and shall trans mit Online Continuous Emission Monitoring System (OCEMS) data to Board's server directly through the data logger without any Intermediate server.

f ) Trade efflue~t of 125.00 CMD generated from Co·gen shall be 100% recycle In process.

G) CREP conditions for Sugar factory

I. Operation of ETP shall be started at least one month before starting of cane crushing to achieve desired MLSS. So as to meet prescribed standards from day one the operation of mill.

II. Waste water generation shall be reduced to 100 ll tl!rs per tone of cane crushed.

Ill. Industry shall achieve zero discharge Into In land surface water bodies. lv. 15 days' storage capacity tank shall be provided for treated effluent to take

care during no demand for lrrigaUon.

HJ Industry to make necesHry urangement to cover the effluent collection syste m and to avoid the Ingress of Bagasse and other material. ~V\M.),CJ

Pogo 4 ol ll

Kindly verify Maharashtra Pollution Control Board's document on Blockcbaan by scanning the OR code h!lps:/lblockcba in.ecmpcb.in/docs/5818d0b051 c8e3a193a225e498482625999d34c8b0c09ce6676e09ec2s08l af2

4:,,., ltv'I.Chhatrapatl S.S.K.Ud.BhavanklagGI

~, Tai.lndapur,Dist.Pune ' -..... --

393

• Maharashtra Pollution Control Board B 5fec253fa11 ad13abfaaef47

2)

3)

4)

S)

(I)

(Ill

{In)

(lv)

(v)

(vi)

I) The unit shall operate ETP oven after completion of the crushing nason so that any effluent generated during washing & maintenance activity II to be discharged after proper treatment.

J1 The unit shall optimize water usa In Industrial process & maintain records,

A) As per your application, you have provided septic tank and soak pit for the treatment of 16.00 CMO sewage.

B) The applicant sh01ll operate sewage treatment system to treat sewage so as to achieve the following standards! pre~crlbed under EP Act 1911 and rules made under time to time, whichever Is stringent.

Not to exceed

Not to exceed

CJ The treated sewage shall be 100 % reusedt racycled for gardening purpose within premise. In no any case, sewage shall find Its way outside Company's premises,

The Industry shall have bllilteral agreement with the farmers on whose land the treated effluent Is used for Irrigation purposes and a copy of the agreements with validity shall be submitted to the ReglonaVSub· Regional Office of the Board. The Industry shall create Environmental Cell by appointing an Environmental Engineer, Chemist and Agriculture· expert for looking after day to day activities related to Environment and lrriga,tlon field where treated effluent is used for lmgatlon. .: •

CONDITIONS FOR MOLASSES STO~GE: ,.-~ ... ..., The molasses shall be properly ~nlct~~,t.ii.P)tored In steel tanks which shall be leak proof. /11. no stage of handling of rriola~~there shall be leakage or spillage. The capacity of tanks for storage of molasse.s shall be such that It will take care of bumper production of sugar, non·llftlng of mola.sses etc. All the area on which molasses are stored and handled should be provided with drain (or diverting the spills to the treatment plant! molasses tank. Suitable arrangements for accidental discharges of molasses from the tanks shall be provided to contain the same within factory premises. Destruction of molasses and its disposal shall not be done without specinc permission in writing from the lluthorized officer of the Board. Intimation of intention to destroy or dispose of the molasses shall be given to the Board at least 15 (fifteen) days in advance by registered post under intimation to the Sub·Regional officer and Regional officer of the Board under whose jurisdiction the factory is situated. The storage tanks shall be kept in good conditions all the year round with adequate maintenance. The tanks size and capacity per em, height, total capacity in tonne.s shall be displayed prominenUy near ton the tank.

The above conditions shall be In addition to and not In derogation of the provisions contained In the "Bombay Molasses Rules, 1955? and •Maharuhtra Molasses Storage and Supply Regulation, 1g65?.

Kindly ver~fy Mahara~htra Pollution Control Board's document on Blockchain by scanning the QR code. https:/lblockchaln.ecmpcb.lnldocsl5818d0b051 c8e3a193a225e498482625999d34c8b0c09ce6676e09ec26081 af2

~lor atvf.Chhatrapall S.S.K.Ltd.Bhavan'-agar

Tlli.lndapJr,Oist.Pune '

394

if~ . 11. ·~ .. ~· : . l!l. .;:

Maharashtra Pollution Control Board 5fec253fa11 ad13abfaaef47

6) The Applicant shall provide Specilk Wattr Pollution control system as per the condiUons of EP Act. 1986 and rule made there under from t ime to time/ Environmental Oeal'3nce 1 CllEP guideGnes if appficable.

7) The Board reserves Its rights to review plans, specitlcatlons or other data relating to plant setup for the treatment of waterworics for the purification there of & the system for tne disposal or sewage or t1'3de effluent or In connectlon with the grant of any consent conditions. The Applicant shall obtain prior consent of the Board to take steps to establ1sh the unit or establish any treatment and disposal system or an extension or 1ddition thereto.

81 The lndustly sl'lall ensure replacement of pollution control system or its parts alter expiry ol i ts expeaed life as defined by manllfllcUer so as tD ensure the compiW!a of standards and safety of the operation thereof.

9) The Applicant shall 'omply owlth the prov1sions of the Water (Prevention & Control of Pollution) Act. 1974 and as amended, by installing water meters, and other provisions as conta1ned m the said act:

101 The Applicant shall provide conditions of EP Act, 1986 •A·• -···•~· ~lr .. Envtrorvnental Oea1'3nce/ OW' guldeUnes.

125.00

484.00

Kindly Ylrity Maharashtra ~lution Conlroil Board's doQJment on Bloc:kchain by scanning the OR cod hUps:/lblodlchaln.ocrnpcb.lnldocs/5818d0b05t ~ 193a22Se498482625999d34c8b0c09ce6676e09ec26~Sial2

~ 3hri.Chhatnp~ti S.S.K.Ud.BhiY...,,

· •. Tal.ln_dapur,Di5lPune

395

Maharashtra Pollution Control Board 5fec253fa11 ad13abfaaef47

SCHEDULE·II Items & cpndltlpns fpc cimpllanco pf Ale pp!!utlon Cont rol:

1} As per your application, you have provided the Air pollution control (APC} system and er ected following stack(s} and observe the following fuel p1ttem·

2} The Appllc1nt shllll provide Specific Air Pollution control equlpments as per the condltlons of EP Act, 1986 and rule made there under from time to time/ Environmental Clearance I CREP guidelines.

1 The Applicant shall provide ESP/ Bag filter/ Wet scrubber to the Bagasse fired boiler and Oust Collector to Sugar bagging section as an Alr Pollutlon control equlpment:s OR as per the conditions or EP Act, 1986 and rule made there under from time to time I E.nvlronmental Clearance I CREP ~~~~e~~es_j .L~

2 The applicant shall operate and ·~IQ~if);\above mentioned air pollution control s stem, so as to achieve the level of olfufants to the followln standards:

Total Partlculate matter Not to exceed 1 SO mg/Nm3

3 The Applicant shall obtain necessary prior permission for providing additional control equipment with necesury specifications and operation thereof or alteration or replacement/alteration well before Its life come to an end or erection of new pollution control equipment.

4 The Board reserves its rights to vary all or any of the condition In the consent, if due to any technological improvement or otherwise such variation (Including the change or any control equipment, other In whole or In part Is necessary}.

5 Industry should not use auxiliary fuel more than 15 % (as per amendment In EIA Notillcation 2009, power plant upto 15 MW based on Bio-mass and using auxiliary fuel as coal upto 15% are exempt.} as co.gen capacity Is below 15 MW.

3} The Appllcut shall obtain necessary prior permission for provldlniJ additional control equipment with necessary specifications and operation thereof or alteration or replacement/elteratlon well before Its life come to an end or erectJon of new pollutlon control equipment.

•> The Board r eserves Its rights to vary all or any of the condition In the consent, It due to a.ny technological Improvement or otherwise such variation (Including the change of any control equipment, other In whole or In part Is necessary}.

hgel oru,

Kindly verify Maharashtra Pollution Control Board's document on Blockchain by scanning the QR cod htlps:/lblockchain.ecmpcb.in/does/5818d0b051 c8e3a193a225e498482625999d34c8b0c09ce6676e09ec26~81 af2

~ .. Shrt.Chhatrapatl S.S.K.Ud.Bhavanklagat,

~ Tai.lndapur,OislPune

396

~ I :- DISTPUHI 1 ~ Regd.No.G.rt

·~· ~ 6'1811955 ~ ---*~

I.. • •

Maharashtra Pollution Control Board 5fec253fa11 ad13abfaaef47

Sr. Conseni(ClE/C No. 20/ClRI

l CtoR

2 CtoR

SCHEOUL!· III Details of Bank Guarantees:

Arnt of Submission Purpose BG

Imposed Pulod of80

Towards compllaoce oiConsent

1000000 15 condlllons days/extended &O&Mol

pollution control system.

15 days/ Towards 500000 Provision eatended oiCPU

BG forfeiture History

Compi/<Jnce Period

31.07.2021

)1.07.2021

Validity Dato

30.11.2021

30.11.2021

,.go I oili

Kindly verify Maharashtra Pollution Control Board's document on Blockchain by scanning lhe OR code. https:/lblockchain.ecmpcb.ln/docs/5818d0b051 c8e3a 193a225e498482625999d34c8b0c09ce6676e09ec26081 af2

~ .. , ~.Chhatr~pal/ S.S.K.Ud.Bhavanleagar,

. ~.T~1.Indapur,Dist.Pune

397

Maharashtra Pollution Control Board 5fec253fa11 ad13abfaaef47

SCHEOUL!·IV

Gene@ I Condltlpos;

The •ppllcant shall provide facility for collection of environmental samples and samples of trade and sewage effluents, air emissions and hazardous waste to the Board staff at the terminal or designated points and shall pay to the Board for the services rendered In this behalf.

2 The applicant shall provide ports In the chlmney/(S) and facilities such as ladder, plarform etc. for monitoring the air emissions and the same shall be open for Inspection tO/and for lise of the Board's Staff. The chlmney(s) vents attacheo co various sources of emission shall be designated by numbers such as S·l, 5·2, etc. and these shari be painted/ displayed to facflftate ldentlllcatlon.

~ ••• ;

3 Whenever due to any accident or other unforeseen act or even, such emissions occur or is apprehended to occur in excess of standards laid down. such Information shall be forthwith Reported to Board, concerned Pollee Station, office of Directorate of Health Services. Department of Explosives, Inspectorate of factories and Local Body. In case of failure of pollution control equipment, the production process connected to It shall be stopped.

4 The applicant shall provide an alternate electrlc power source sufficient to operate all pollution control facilities Installed to maintain compliance with the terms and conditions of the consent. In the absence, the applicant shall stop, reduce or otherwise, control production to abide by terms and conditions of this consent.

S The firm shall submit to this office1• th~ . 30th day of Sept!mber every year, the Environmental Statement Report for the tinanclal year endmg 31st March In the prescribed Form-Vas per the provisions of rule 14 of the Environment (Protection) (Second Amendment) Rules, 1992.

6 The industry should comply with PJ~if1,fZ~r!l9us-k Other Wastes (M & TM) Rules, 2016 and submit the Annual Returns a$~r;)iule 6(5) & 20(2) of Hazardous & Other Wastes (M & TM) Rules. 2016 for the prece(l/r\g;Y,~6A"pril to March in Fonm-IV by 30th june of every year.

7 An Inspection book shall be opened and made available to the Board's officers during their visit to the applicant

8 The industry shall constitute an Environmental cell with qualified staff/personneVagency to see the day to day compliance of consent condition towards Envitonment Protection.

9 The applicant shall install a separate meter showing the consumption or energy for operation of domestic and lndustrlal effluent treatment plants and air pollution control system. A register showing consumption of chemicals used for treatment shall be lf!aintalned.

10 The applicant shall bring minimum 33% of the available open land under green coverage/ plantation. The applicant shall submit a yearly statement by 30th September every year on available open plot area, nulf!ber of trees surviving as on 31st March of the year and nulf!ber of trees planted by September end.

11 The Industry shall submit official e-mail address and any change will be duly lnfonmed to the MPCS.

12 Industry should monitor effluent quality, stack emissions and ambient air quality monthly/quarterty. ·

h9<9oltl

Kindly ve~fy Mahara~htra Pollution Control Board's document on Blockchain by scanning the OR code. https:/lblockcharn.ecmpcb.mldocsl5818d0b051 c8e3a 193a225e498482625999d34c8b0c09ce6676e09ec2608! af2

ana 1 Director · Shrl.Chhatrapatl S.S.K.Ltd.BhavaniAag<ll,

Tai. ln_dapur,Disi.Pune

398

Maharashtra Pollution Control Board 5fec253fa 11 ad 13abfaaef4 7

ll The Industry shall rKyclureproccu/r~seJrecover Hazardous W.sta as per the provision conta in In the H&OW(M& TMJ Rules 2016, which can bo recycled/processed/ reu"d/ recovered and only woste whkh hts to be Incinerated shell go to Incineration and Wlllt whlch con be used for land ftlllng and cannot be recycled/ reprocessed etc. should go for that purpose, In order to reduce load on Incineration and landflll site/environment.

14 Industry shall strictly comply with the Water (P&Cf>) Act, 1974, Air (P&CP) Act.l981 and EnvltOMiental Protection Act.1986 and Industry speclnc standard under EP Rules 1986 which are evallabte on MPC8 web~te(www.mpcb.gov.ln).

15 Sepal'llte drolnagc system shall be!rovlded for collection of tl'llde and sewege effluents. Terminal manholes s'holl bo provide at the end of tho collection system with arrangement tor musuring the flow. No ernuent shell be admitted In the pipes/sewers downstream of the terminal manholes. No effluent shall ftnd Its woy other than In designed end provided colle<tlon system.

16 Neither storm water nor dlscherge from other premises shall be ellowed to mix with tht

. :! 17. Conditions for O.G. Set

)

effluents from the foctory .

a) Noise from the D.G. Set should be controHed by providing on acoustic enclosure or by treatlnil the room acoustically.

b) Industry should provide acoustic enclosure for control of noise. The acoustic enclosure/ acoustic treatment of the room should be designed for minimum 25 dB (A) Insertion loss or for meeting the ambient noise standards, whichever Is on higher side. A suitable exhau.st muffler with Insertion loss of 25 dB (A) shaU also be provided. The musurement of Insertion loss wiU be done at different points at 0.5 meters from acoustlc enclosure/room and then average.

c) Industry should make effortS to bring down noise level due to OG set. outside industrial premises. within ambient noise requirements by proper sitting and control measures.

d) Installation of OG Set must be strictly In compll1nce with recommendations of DG Set manufacturet. ·.r"'J._ ·' , ,r~1 ..

e) A proper routine and preventive tn~it'f.e.'!~Jicfprocedure lor DG set should be set and followed in coosllltatlon with the D~.1'g~~!ffacturer which would help to prevent noise levels of OG set from deteriorating with use.

f) D.G. Set shall be operated only In case of power failure. g) The appUcant should not cause any nuisance In the surrounding area due to operation of

O.G. Set h) The applicant shall comply with the nottncatlon of MoEFCC, India on Environment

(Protection) second Amendment Rules vide GSR 371(E) dated 17.05.2002 and Its amendments regarding noise limit tor generator set.s run with diesel.

18 The Industry should not cause any nuisance in surrounding area. 19 The Industry shall take adequate measures for control of noise levels from Its own sources

within the premises so as to maintain ambient air quality standard In respect of noise to less than 75 dB (A) during day time and 70 dB (A) during night time. Day time Is reckoned In between 6 a.m. and 10 p.m. and night time is reckoned between 10 p.m.. and 6 a.m.

20 The applicant shall maintain good housekeeping.

21 The non-hazardous solid waste arising In the factory premises, sweepings. etc. be disposed of sdentJI'Ically so as not to uuse any nuisance 1 pollution. The applicant shall talce necessary permissions from. clvk authorities for disposal of solid waste.

22 The applicant shall not change or alter the quanti ty. quality, the rate of discharge, temperature or the mode of the etftuent/emlsslons or hatardous wastes or control equipment provlded•for without previous written permission of the Board. The Industry wtll not carry out any acUvlty, for which this consent has not been granted/without prior consent

ofthe8oard. ~~

~09< 10 oC II

Kindly verify Maharashtra Pollution Control Board's document on Blockchain by scanning the QR code. https:/lblockchaln.ecmpcb.in/docs/5818d0b051c8e3a193a225e498482625999d34c8b0c09ce6676e09ec26081af2

~lor ~.Chhatrapall S.S.K.ltd.Bhavanklagar,

Tai.lndapJr, f:'bt.Pune

399

.. Maharashtra Pollution Control Board

z~:«~· 5fec253fa11 ad13abfaaef47

23 The Industry shall ensure that fugitive emissions lrom the activity are controlled so 15

to maintain clean and safe environment In and around the factory premises. 24 The Industry shall achieve the National Ambient Air Quality standards pre.scrlbed vide

Government of India. NotJncatlon dtd. 16.11.2009 as amended.

• COIISlHfoOOOOOt4MJ

.. , ...

~

hgt II <>Ill

Kindly verify Maharashtra Pollution Control Board's document on Blockchain by scanning the OR code. https://blockchain.ecmpcb.in/docs/5818d0b051c8e3a193a225e498482625999d34c8b0c09ce6676e09ec26081af2

# . ·• Managing Director

8htf.Chhatrapall S.S.K.ltd.Bhavanlugar. Te!.lnda~_r,Dist.Pune

.....__ ~ ·- - -

T.C.

T.C.

T.C.

400

T.C.

~:~\\~H.~\\'~~.~\\,\ \ ~ : . , ut ~\\~<::¥

~ t ··H tt-~\'~"'' ""· ~ ~ : ~ \~~!.)\ li. fl. 00.1 ':(\~~<::\ f~ ~\\~" 3

.w"l EJ;Jtlfu ~eq;rx') ~r~~ Cf5t'!:t'lrvrr fin;

'flfl"l1~11~. ffi. ~~,~. ttl. JUT QH~ -.,;ft'l (1{r-Rf) f't:lw •13 \l~~~OS/ Quality

Endorsed Company

~qm :

~~.ft-~ 1{Wif ~ Shri Chhatrapati S. S. K. Ltd;

~-- = ·~ .... , .. <' 1t'4f;fl0f 4j( (~ )

To,

BHAVANINAGAR, TAL. INOAPUR, DIST. PUNE JIIN CODE 413164 - MAHARASHTRA (INDIA)

f~ : t:?1 /0~/ £42-/

Deputy Director Genera) of Forest (Central), West Central Zone, Regional Office (WCZ) Ground Floor, East wing, New Secretariat Building,Opp.VCA Ground, Civil Lines, Nagpur • 44000.

Dear Sir,

Sub Environmental Status Report for the period of December to June 2021.

Ref. Compliance of Environmental Clearance for Expansion and Modernization of the sugar unit of capacity 3500 TCD to 6500 TCD along with Co-gen Power Plant 18 MW at Village Bhavaninagar, Tal.- Indapur Dist.- Pune by M/s. ShriChhatrapati Sahakari Sakhar Karkhana Ltd., by the State level Expert Appraisal Committee-! Maharashtra vide: SEAC- 2016/CR-220/TC-2 dated 3 December, 2016.

With Reference to the above subject we are submitting the environmental status Report and Compliance of Environmental Clearance conditions.

Thanking you,

Ax. R12 401

T.C.

-

SHRI CHHATRAPATI SAHAKARI SAKHAR KARKHANA LTD, BHA VAN/NAGAR

Compliance of Environmental Clearance conditions for Expansion & Modernization of sugar unit capacity 3500 TCD to 6500 TCD along witb Co-generation power plant 18 MW at village Bbavaninagar, Tal lndapur Dist. Pune by Mls. Sbri Cbhatrapati Sahakari Sakhar Karkhana Ltd. Bbavaninagar Mabarashtra -413 104 (State level Appraisal Committee vide: SEAC- 2016/CR-220fiC-2 dated 3" December 2016)

r. No

II

iii

IV

v

VI

v ii

General EC Conditions ( For ?reconstruction Phase)

No additional land shall be used /acquired for any activity of the project without obtaining properpermission.

Molasses storage tank capacity shall be 35000 MT and care shall be taken that no percolation take place is possible from these storage tanks.

PP take almost precaution for the health and safety fthe people working in the unit as also for rotecting unit.

For controlling fugitive natural dust, regular sprinkling of water and wind shields at appropriatedistances in vulnerable areas of the plant shall be ensured.

Proper Housekeeping programmers shall be implemented.

In the event of failure of any pollution control system adopted by the unit, the unit shall be immediately put out of operation and shall not be restarted until the desired efficiency has been achieved.

A stack of adequate height based on DO set capacity shall be provided for control and dispersion ofpoUutant from DG set. ( lf A licable)

Compliance

No additional land was acquired.Existing land of 52.56 hectares(For sugar Plant is-34.57Ha. isade uate. Molasses stored in Steel tank and there is no any percolation take place.

oted and shall be complied.

Sprinkling of water is done regularly and wind shields were provided at constriction activity.

Housekeeping is maintained by avoiding spillages, leakages and cleaning with hot condensates to avoid bacterial contamination.

Noted and shall be complied.

Yes

402

VIII

ix

X

XI

XIII

XIV

.

Shri Chhatrapati Sahakari Sakhar Karkhana Ltd, Bhavaninagar

A detailed scheme for rainwater harvesting shall be prepared and implemented to recharge.

Arrangement shall be made that effiuent and storm water does not get mixed.

Periodic monitoring of ground water shall be undertaken and results analyzed to ascertain any change in the quality of water. Result shall be regularly submitted to Maharashtra Pollution Control Board. Noise level shall be maintained as per standards. For people working in the high noise area, requisite personal protective equipment like earplug etc.shall be provided. The overall noise levels in and around the plants are shall be kept well within a standards by providing noise control measures including acoustic hoods, silencers, enclousers, etc. on a11 sources of noise generations. The ambient noise level shall conftrm to the standards prescribed under Environment (Protection) Act, 1986 Rules, 1989.

Green belt shall be developed & maintained around the plant periphery. Green Belt Development shall be carried out considering CPCB guidelines including selection of plant species and in consultation with the local DFO/agricultural Dept.

Adequate safety measures shall be provided to limit the risk zone within the plant boundary, in case of an accident. Leak detection devices shall also be installed at strategic places for early

Rainwater harvesting is implemented and stored in a welldesigned rain water harvesting pond. • Size and no. ofRWH

tank(s)and quantity- 150 M3 (03 Nos).

This would help to eliminate the requirement of fresh water to beaded into spray pond. Separate collection systems

~re provided

Being Implemented

Complained. The results are given in Annexure I

Noise levels are monitored regularly and ambient noise levels are within the standards. At work places such as compressors, boilers, turbines,rnill house etc. Noise attenuating green belt will be developed to reduce noise impacts.

09.00 Hectares land used for green belt purpose. The industry planted 5000 trees. Remaining I 000 trees shall planted within next year. The industry proposes to plant 500-700 trees per year in order to increase the green belt over and above 33% ofthe total factory area. All the safety measures as per the factory act are strictly foUowed.

detection and warning. ~~~~

403

Sllri Cllhatrapoti Solwkari Sakhar Karkhana Ltd, Bhavaninogar

detection and warning.

xv Occupational health surveillance of the workers Regular health check up of shall be done on a regular basis and record employees working at vulnerable maintain as per factories act. places is carried out and record is

maintained. xvi The Company shall make the arrangement for Fire fighting arrangements have

protection of possible fire hazards during been provided around the storage manufacturing process in material handling. of molasses, bagasse and sugar

godowns etc. Fire bridged is available with the industries and municipalities for fire bridged in case of emergencies.

xvii The project authorities must strictly comply v. ith The only hazardous waste

xviii

tht: rules and regulations with regard to handling generated is spent oil and disposed and d1sposal of hazardous wastes (Management an< as per CPCB Guidelines to Handlmg) Rules, 2003(amended). authorized recyclers.

Authorization from the MPCB shall be obtained for I collection /treatment/storage/disposal of I

hazardous waste. I

The company shall undertake following Waste 1\llinimization Measures -

I • Metering of quantities of active ingredients to mintmize waste.

• Maximum recoveries • Use of automated material transfer system to

minimize spillages.

I a) Weighing is done for all active

ingredients to minimize

I wastage. Molasses is used for sale. Press mud and ash are soled as agri farmer and brick manufacturer as manure.

b) lndustry has implemented modern techno logics in the process ,both in sugar and co­gen plant.

c) Automation is implemented, both in sugar and co-gen unit.

x1x 1 RegJiar rncck-d~ills for on)ite c:nergcncy The Safety department conducts

I 1managernmt plan I regular mock drills and no vehicle shall re carried out. Implementation of changes I is permitted to park inside. The

I !improvement I Factory and all visitors are required if any, in the oncite management planshall required to wear he lmets.

1

be ensured. I xx 1 A separate env1ronrnent management cell w1th · A separate management cell with

Uuaiifi~d statT \ all the heads of department is

all be set up tor implementation of stipulated constituted and a senior vi ronmental I Environment consultant is feguards. .. engaged to supervtse the activities

-----~-~~ --~-~·--' ----~~--------~an~d~im~lp~l~e~m~e~n=ta=t~io~n~o~f~------~ . ' ··-··-.

. . ~

404

XXI

xxi i

xxiii

I xxiv

XXV

.

Shri Chhatrapati Sahakari Sakhar Karkhana Ltd, Bhavaninaoar

Separate funds shall be allocated for implementation of environmental protection measures /EMP along with item-wise break up. lfhese cost shall be included as part of project cost. trhe funds earmarked for the environment protection measures shall not be diverted for the purposes and tyear-wise expenditure should reported to the MPCB I& this department.

[rhe project management shall advertise at least in two ocal newspapers widely circulated in the region around he project, one of which shall be in the Marathi

language of the local concerned within seven days of issue of the Jetter, informing that the project has been jaccorded environmental clearance and copies of !clearance letter are available with Maharashtra Pollution Control Board and may also be seen at Website at http://ec.maharashtra.gov.in

Project management should submit half yearly ~ompliance reports in respect of the stipulated prior !environment clearance terms and conditionings in hard land soft copies to the MPCB & this department, on I st

·une & I ~~ December of each calendar year.

A copy of the clearance letter shall be sent proponent o the concerned Municipal Corporation and the local ~GO, if any, from whoem suggestion/representations, if any, were received while processing the proposal. [rhe clearance letter shall be also be put on the website pfthe company by the proponent.

jrhe proponent be shall upload the status of compliance pfthc stipulated EC conditions, including result of monitored data on their website and shall update the !same periodically. It shall simultaneously be sent to egional Office of MoEF, The respective Zonal office

of CPCB and SPCB. The Criteria pollutants levels namely ; SPM,RSPM.S02 ,NOx (ambient level as well ~s stack emissions) or critical sectorai location

..

Environment Protection measures.

Separate budgetary allocation is earmarked for the environment protection measures and funds are not diverted for any other purpose.

Already Informed

Half yearly compliances reports aren't submitted regularl)'.

The Copy of the environmental clearance was given to the local grampanchayat and put in the company website.

The results are given in Annexure I

405

Shri Chhatrapati Sahakari Sakhar Karkhana Ltd, Bhavaninagar

xxvi The project proponent shall also submit six monthly Six monthly reports are regularly 11~~ epcrts on the status of compliance of the stipulated EC submitted.

conditions including results of monitored data (both in hard copie:> as well as by the e-mail) to the respective Regional office ofMoEF, the respective Zonal Office ofCPCB ~o1d the CPCB.

xxvii The environmental statement for each financial ending Environment Statement, Form V 31 ~~ Vfarch Form-Vas is mandated to be submitted by is submitted regularly to the

I the rroJ~~t proponent to the concerned <;tate Pollution MPCB every year on or before k:ont'"ol Board as prescribed under the Environment 301h September and also put in the 1(Prrtectior) Rule!'-.1986. ac; amended subsequently, website of company. ~ha11 ~I so be put on the website of company along with he statu .• c f .~omplianre of EC conditions shall also be

sem to lh~! respective Regional Offices of Moi:.F by ~mail.

_____ .,. I I Necessary arrangements shall be made to adequate All the ~mployees are given saH:~t'· and ventilation arrangement 111 furnace area. I safety equtpment such as heat

I - resisting aprons, gloves, boots, 1 helmets etc. and besides adequate

I I natural ventilation in the working

area. I

4 j The Envtronment clearance is being issued I Noted

I ' "' dv.> Jt ,:>'"ej.Hitcc to tl:e action initiatc.;d under EP • A<"t or . 1 y cot.. 1. case p::nding 111 the court of law I , and 1t aocs not mean that prOJI.!Ct proponent has not

violated any environmental laws in the past and whatever decision under EP Act or of the Hon. ( 'I rt '" II be binding on the project proponent.

I I I fence this clearance does not give immunity to the I I I proJeCl p10ponent in the case field against him, if

I an. 0 r acuon ilnit&.teJ under LP Ac..l.

I I ,. ....

I I ThL em. troumt!nt depanment reser vc:s ~the right to Noted 5 revukL t11t: clearance if conditions stipulated are not

I 11nplemcnted to the sadsfactio11 oftne department or t.1ar rnatter. tor any uthc:r admin1s:rative reason.

I

I 6 I Valid it) of environment Clc.arance ; The environmental dcarancc accorded shall be valid for Noted

I c: ·-r><' f7 . ..:ars :5 rc·r ~1oEF.& cr: '-otification I d~l·,,l 29 •\ i) ·i J.:~O 15 t0 thC' stnrt OJ rr .•duct ion

I l or ~r:lt; ' '~.

I I

..

406

Shri Chhatrapati Sahakari Sakhar Karkhana Ltd, Bhavaninagar

7 In case of any deviation or alteration in the project Noted

proposed from those submitted to this department for clearance, a fresh reference should be made to the department to assess the adequacy of the condition(s) imposed and to incorporate additional environmental protection measures required, if any.

8 The above stipulations would be enforced among Noted

others under the water ( Prevention and control of Pollution) Act,I974,The Air (Prevention and control of Pollution) Act, 1981 ,The Environment (Protection) Act, 1986 and rules there under, Hazardous Wastes(Management and Handling) Rules, 1989 and its amendments, the public Liabil ity Insurance act, 1991 and its amendments.

9 Any appeal against this environmental clearance Noted

shall lie -with the National Green Tribunal (Western Zone Bench,Pune), New Administrative Building, 151 floor, O-Wing, Opposite Council Hall, Pune, lfpreferred, within 30 days prescribed under Section of 16 of National Green Tribunal Act,2010.

407

Shri Chhatrapati Sahakari Sokhar Karkhana Ltd, Bhovoninagar

ANNEXURE- I

..

.. .-

408

Shri Chhatrapati Sahakari Sakhar Korkhana Ltd, Bhavaninagar

Annexure -I

TE5T CERTIFICATE

Client Name and Address: Date of Sampllna --- 15/03/2021 1 Report No: GESEC/2020.21/0l/8308 Date of Report f 22/03/2021_

Shrl ChhatrapatiSahakarlSakhar, start Date of Anal~~ 16/03/2021 -o

Karkhana ltd, End Date of Anill~s --1- 22/03/2021 -~-Bhavnlnagar Tailndapur, Sample Details Ambtent Atr

I Ol~t Pune.413104 -- __ Sample location f Gentral Off"e

Time of Samplin& 10·25 ~mple Collect~ By Grl!!t'n Envtro•afP Enatne,.r~ & Consultant Pvt Ltd, Pun!!

~-,

Ambient Alr Analysis Report Sr. No. t

1. !-

2.

3.

Parameter

Ambient TemperOJture

Dry Bu lb Ttmperatu~t

Wet Bulb Temperature

l Result

29 r-t 29

27 + --------t-

4 llelatlve Humidity t Silmplln& Ouratlon

Ammonla(NH1)

l4. BenWie((4H, )

15 Brnto(a)Pyren•(BaP)

16. r Arsenic(As)

17 j Nlckei(NI)

Af'mark ·

I

J l

t-­T

64

440

14 1

18.9

SS.J

21.1

0 .1

<20

BDL

8Dl

8Dl BDL

BOL

l:iDL

Unh(s)

·-

, All above re$ult• ~rl! within Nattonal Ambtent Alr Qvalttv standards , 8DL- Below Oeteuable Lomtt. .. ~.... ... ~- / ~~

I '"):

~, --- ~ , ........ .,...tent ... ll~" ... -/

1h.,r"'ff0"11lf\f .. io1Pb'-tlli•~1auct•Nf""'•~'-''4'biA .__~ t?.r-.lltttCiiioo alllltllb ~..-l,..,..tftLtlcJiilM~ ..... -t.ct_.,._..._ ~--~~tft.li" 'T!*Iftl ~ t6-.ol bllll-tlf~~ .... ..,... .,.., aw • .._.:.twj.IVd l.- poMGJoi'Ui., ..... ~lill\f~f \~··tllt•llt ............. -i..»d .tNWolllli7td"r*'t"'~ ... .-~tLl,....l'!tl'frtrti<M ..

Wtll•~<~lilfltLalht.tllil1a.<onf"Giti~Wf-'"'twtr~~~~~~~4~~ti',Wti"'~~(~~ou"" •• ,..,.,~

U~J.-r o~;MKfl••·~ ovt ('I'IIMN J.tvrn-.~09jO."T..!'Ut0 IJII

NAAQ Standards

s 80

sao ~--.

_ll00:.._ __ ---1 S60

S04

s 180

S!O

~400

sos SOl

S06

SJO

.... ,, .. .,. ..

409

4 ..

Shri Chhatrapati Sahakar/ Sakhar Karkhona Ltd, Bhavaninagor

~~ GREEN ENVIROSJ:IFE ~ Enqlne•r a & Consultant Pvl l.td

Report No: GE~EC/2020 11/03/8:109 Client Name and Address: Shri Chhatrapati Sahakari Sakhar, Karkhana Ltd, Bhavninagar Tal lndapur,

Dist Pune.413104

SuNny No l.t05i1JC, M.wurl R· .. ~" I!Jrw; Shop Nrr1G 2nd f ~Xll' s.,,_.,~s.~;'JO• T:ll Sn•rur PullC- 11 2.'01!

I.!Ob· 95~508'!1120 I E ma.l yesec 1:!@ Jmd•l corn v.wwor(>er'I01Mros:;!c co'" C IJ N • llt4000f'N";(li3PTCI·t'.l66G

TEST CERTIFICATE 1 DOltc of Report ---~22/03/2021_ Date of Sampling tS/03/2021 1 Start Date of Analysis 16/03/2021 ___ _

End Date of Analysis 22/03/202!_ l Sample Details Am brent Atr

Sample Location Sucar Factory !-'la~n Ga~

Green_invlrosafe Engineers~ Consultant Pvt. ltd, P!::'!!!__ ~ample Collected By Time of Sampling 10;40 =--J

Ambien t Air Analysis Report Sr. No.

1

Pammet er

Amblt!l't i ernperature I Rc~ult - Unlt(sl NAAQ Standards

29 "C

2 Dry Bulb Tf'mperature - -+ 3. Wet Bu1b Tf'mperature

4~ Relative Humidity ~-·

5. Samplins Duration

6. Sul phu1 Olmddi!(SO,)

~Oxide, of Nltroau,(NO,)

8. P<>Uirula J! M:tttt'J PM1u

rs. :Part1r.ula~e Mnttcr PMu

10. -I. Carbon Monolllde {CO)

11. t OzonefOl )

.12. l Leat! 'Ph)

~13. L Amrno'l':t(NH ,)

14 8Pnlf'nf!(t: Ho) t 15. Benzo(a)P-frene(BaP)

~ 16. Ar~n ic{As) 17.J Nlckei(NI)

~i

+ I

29

'J.7

(,4

440

ll 3

10./

51.4

24.b

02

<20

DOL

BDL

•c "C

~RH

Mtn

1Jg/Ml

IJg}'MJ

~)

ng/M'

r Remark -

, J.lll .thovc rl'!'sults at~ within Natronol Amu•ent Air Quality standards. ,. E , . - Below Uetectable Umlt.

ANALYlEO BY· /. f fo'-'JllC--

t

~ 80

sao :5 100

:>60

S04

c; 180

~ 1.0

S 400

sos ~---

s 01 ~--

S06

s 20

410

Shri Chhatrapati Sahakari Sakhor Karkhana Ltd, Bhovaninagar

Rec:O(II'IMd by Ministry of EowOMWnt Fore•l l Clinlatt Chan110 IMoEF I Govt of ,11\dil end ISO.'IEC 1702S 2005 (NABLI, ISO 1001.2015 and OliSAS 18001 · 2007 Certtl*f ComPIIny

TEST CERTIFICATE O:Jte of Report f __ _ 22/0l/2021

I Date of Sampling 15/03/2021

Start C!_CJte of Analysis 16/03/2021

~ . ·-~

, tnd Date of Analysis j 22/03/2021 Sample Oet;lls _ Ambte!!!_ ~ ~

Sample Location ( _ Worker Colonev Area 1

Sr. No.

1

P:uameter

Ambient Temperature

JllmeofSampllng l ll:lS -- Gree, Envlrosafe Engineers & Consultant P~ Ltd, Pune __ ._,

Ambient Air An~lysi~ Report _ l Result NAAQ Standards

29

2. Dry Bulb Temperiture -t-

3. Wet Bulb Temperature

[ 4. Relative Humidity

5 . Silmpllns Duration ' ~ulphu• OO..IdoiSO,J l

~ 7. OxldesofNitrogen(NOt) ~ ~ 8 PartlculatP. Matter PMto

~;;.l<ul~te """"PM_, t 1-

1- carbon Monodde (CO) .. l Ozone(Osl

ead (Pb}

~ 13 . ~ Am!!'onla(NH ·)~-14. Bentene((Nf,) ----

I lS.:.j 8enzo(a)Pyrene(8aP) -·--

~ 1

Arsenlc(As)

l7 • ..L.Nickei(Ni)

RPmark·

79

~7

64

440

14.2

16./

41.3

25.1

0.1

<20

BDL BOL

BD

BDL

Min

IJ.ii'M'

+-lli/Ml

I

y.g[MJ -

+ -+-~.tlt!M 1

~.tg/MJ

1 -r ng/M 1

-~g/M'

S80

:. eo ______ slOO

s 180

!:il.O

~400

S OS

SOl

::.06

s 20

, All abovf' rtosults art' wrthin Natron<JI Arnbrent Air Quality standards, BDL- Below Detectable Lrmrt

ANALY'ZEO BY·

,_... f> M lf•:>~>P>ftll•blorr.- ..t •;:N ' '"'" IU•cfll/01/lOif loll&/fll.{JVJ2

411

Shri Chhatrapati Sahakari Sakhar Kar khana Ltd, Bhavaninagar

Rt<Ogn•Mif by M•""' 'l' II' •nv~ FOfMt 6 CI<N.tt C~ IMofF I GoV1 ot lndb &lid ISOI!EG 17025·2005 [NA8l).ISO toOt 2015 alld OHSAS 18001 20t1 t.n.liecl Company

Rep~rt No: G~Et/lOlO·ll/03/8311 Client Name and Address:

Shrl Chh,.treoati c;:thakari Sakhar, Karkh:ana Ltd,

BhavniMgar Tal :nc!apur, Dlst Pune.413104

1"ample Collected By

Sr] No.

i'ar.•meter

1. Antt11ent rernperature

2. Dry Rulb Tr:mpt"rature

3. W-:t9u'l Ti•mperature

4 . Relative Humidity

5. Sampling Duration

6. Sulphur Olo:dl:!e(SO~)

f 7. Q,;ldcsofN.trogl!l.(NO,)

a. +- p, ttc.:.ta 1 r.t.w 1 rr.1,~

9.

1 Part r1 •all' M:lttl'f PP.h ~

10. r~•bt!n _, c-:o~ldP.(CO)

~ 11. 01011('10,}

12. lca:l 'Pb)

13. An r. 1 o(l\ tt l

TEST CERTIFICATE

Date o f Repon -1--- _]]./03/20ll -== O,ltc of Sampling lS/03/2021

Start Date of Analysis ___ 16/03/2021 ~-End Date of Analysis __ 22/03/3_021 _ __

Sa111ple Details Amb1ent Air

Sample location 1 Marketplace Are• ( vyapari Peth)

t Time of Samplin& l1:,.;.3.;..S ____ -;

Grj'en Envtro•afe Engmeers & Consultant Pvt. Ltd, Pu:..:.ne=----l

Ambient Atr Analysis Report

t -

+

Result

15 6

1/.tl

113 1

"JEI.,

l Unlt(s)

"C t

flg/MJ

J.lg/M-'

~-tg/M 1

NAAQ Standards

s so

-=-t ~80

:: -- I ;;; I

~ 14. : SC!IIl !U [C. I

15. 6 •t JO (.,~!aPI .. 16.

4 Ar~~>nlr(l',!;)

l7. NtckeiiNtl

Remark-

-1 B~.

sc:.~.

so SOL

BOL

--1 t l.

~--+-------~so~o~ pgJM'

ng/M '

ng/M' -f. ng/M ' -L.

SOl

:S06

:1: 20

, ~ I 11b JIIC results arP. w1th1n Nauonal Ambient Alf Quality standards.

"'"'• Be;ow Oett;ctable Um;t. ANALV'"F" "'

L-

.,

412

Shri Chhatrapati Sahakarl Sakhor Karkhona Ltd, Bhovaninagar

Recognlud by Minl1try ol Enwon..,.nl f-t & CI11Mte Chongo(Motf) Govt ot Ind .. and ISOIIEC 102S 2005 (NABL), ISO 8001 2015 tnd OHSAS 18001'2~7 Ctrt~ Company

~ Report No: GESEC/2020·21/03/8U2 . Client Name and Address: Shrl Chhatrapatl Sahakarl Sakhar, Karkhana ltd, Bhavninagar Tallndapur,

-f -~ 22/03/2021 - --~ Oate of Sampling 1.!1/03/2021 I Start Date of Analy~ls 16/03/2021 End Date of Analysis 22/03/20!}__ Sample Detail~ Ambtent Air

Sample Location r Chimney are;a ( Factory primyces) 1

TEST CERTIFICATE Date of Report

Dist Pune.413104 Time of Sampling ~ ---l

1 Sample Collected By Green Envarosat~ l::ngtneers & Consultant Pvgtd, Pune j

Ambient Air Analysis Report

Sr. Parameter No. I

l . I Ambient Temperature _

2. t Dry 8ulb Temperature

Wet 8ulb Temperature

II . Rotative Humidity --+ -5 Sampling Duration

6i¥.Sulphur Olowlde(SO,) 7 Oxides of Nitrogen(NO,)

8 . PartJculat~ Matter PMtn 91 Particulate Matter PMJ ,

10. Carbon Monowlde (CO)

11. O.zone(O,)

12. Lead (Ph)

14

16. Arsenlc(As)

17. Nlckei(NI)

Rf'mark

I 1

1

29

29 2.7

C4 440

19 9

l t>O

<]0

BDL

OOL

SOL

BDL

·1 Unlt(s)

•c •c •c

Min

~o~a/M

llg/M~

1J&/M1

llYM'

rlS Benw(a)Pyrene(8aP)

All ;;bcvt' r~~ults oJrt' w tthln National AMI.Jtent Atr Quality standards. , ODL- Below Detectable Urrut.

ANALYZED8Y· ~

·~ (!(?;)~ r ...... - ........ - ~d'c "''

t-.rrputlfttflln ... trloth•~l~•h ~ .. ,_.....totf•bl.t!' ........£ _.-\

----1

NAAQ Standards

'S 80

~80

s 100

S60

s 04

'180

s 1.0

:.400

~OS

~01

~06

~ 20

lSI<. ftwtr-.ul"'hnaon• lt.~ ~ IIClOf'tm.;J'tiff._D.isfdg~".al"kalaiM..'!i1il""-"'£:tJa iF.Up ~ . It , pr.s"

~Mt"''"""'" .-""~..,.........,.,. "'"'"""""-w..-r . .. ....,..,...,. publklty,..,,.... ~wilbror#1.K¥c:f ·~ef\of"'!Hft(IJ...,., •ftD\~IORII.-.~ loniMfftrntet~p;!fitld\c•·

'> . W•ttnctly ,.. • .,.tam ltrr-,onr~.._. Cv ot•!ltV'l( r«"t~Uhof'\ttt'•pk•bl Co.Wt.-ctf , •~ •pplttdbflu. tutnH41~ ft'Ct".JII~t"M " '-

M411 I.JHNIIIIII..df•llbrtt.JoM l'' ~ tl ~ fullrlJd-tl~ t)'itjltJ/)(H'JM~'(Jn.IJ '·

413

I

I ~

I

Shri Chhatrapati Sahakari Sakhar Karkhana Ltd, Bhavaninagar

~Ill' GREEN ENVIROSAFE ~ Engln•nrs & Conoultof\t Pvt ltd

';•JM", N <1<'\!0b Muy1111 RO''·!I"OI'y, l>liOfJ No-~t. ~ncJ l'l!)()r ""1''11!:\~·lW T~l·~lrt.lt P\Jrl(!·41;>208

M:Jh. 1 • l~lt)1(j?Q f m>Jil .f' ···or ... 12 ~·grn.-;•l.co·, "../1\Vw Qtf•fHI(•nvvos.)to co tn

)N II" l /4[/()(IPN;>(I1Ji'll.:110flt>Q

Recognised by M• I rry olEn t0<111tont ~"'"' & Cllmllo Changt (MoEF ) Govt. ollndia 111d ISOIIEC 17025:1005 (NABL),ISO 9001.2015 and OHSAS 11001:.2001 Conifitd Comp•ny

Report lh: GtS~t:/2010-21/03/8313

I Client Narne ctnd Address: Shri Chhatrapati Sahakari Sakhar, Karkhana ltl Bhavninaga Tallndapur,

Dlst Pune.413l04 rample Collected By

,. r LOcation ~

'itJC:!t hr~ur" I

• ., .... , .. ~ ........ T... r 3 'I.'Clrl..r t.obny -- -

2

Remark·

TEST CERTIFICATE oatG of Report

Date of Sampling_ - .. =r_

I 22/03/2021

15/03/2021

t 4 Fa.:lvr~ Main Gate

.. All above N01se level results are wn~ n Central Pollution Control Board Standards limJl.

,.. Oay/NI~~t l5/'JO dB.

f ANA! y,~ "V

414

Shri Chhatrapoti Sahakari Sokhar Karkhana Ltd, Bhavaninagar

Report No: GESEC/ 2020-21/0l/8314

~Client Na~e and Address: Shri Chhatrapatl Sahakari Sakhar,

I Karkhana Ltd, Bhavninagar Taltndapur, Oist Pune.413104

TEST CERTIFICATE Date of Report ~T" - 22/03/2021 ~ ~ --- --1 Date of S;,mpllng _ 15/03/2021

Start Date of Analysis ~3/2021 _ J End Date of Analysis 22/03/2021 Sample Lootlon ~20 TPH (W~ubb!'rl

t Sample Details Stack TlmeofSampting I _ - 12:15_ . _ Green Envtro~~tt E:ngtnee':!._& Consulta~ Ltd, Punt J

Source Emission Analysis Report

r Result l Unit(sl T - Umlts As Per

t S;~mple Collected By -

I Sr. Parameter No.

1. Matenal o1 ~tad. Ms

2. Stat~ HeiBht from AR. 60 Mtr

3. Tvpe ot Stack

4 S<!mpllng Duration -5 Flue Gas Temperature .... 6 Differential Pressu~

7, VelOCity

8. Otmen~lons of Stack

9 ~$tad; Area

10 Gas VCIIume

~ 11. ~ Part.culete M•tter _

12 , Sulphur OtO'I(tde tSO.I

J - 1

Round

3?

415

s 17

9 41

~0

7065

150160.035

50.3

41 7

061 l13. Oxide Of Nltroaen (NOx)

Rt>mark(s): "' All above results a~ wef, Wttlltn MPCB Ltmtt.

_ ~Ol Spe<;:..rf_led_.;._ __

ANALYlrD BY·

!tn!a.-..d~

~t>l~ &t .. .-c.'f'-PwtiJI1ft,.~1~A«iNC ....... &o-•Ht-..ll

Mtr

M'

NM1/Hr

mg,t~~·

~NM 1

Kg/day

MPC8 Consent

S?O

n, ...... ~.~t:.-,t.I'Hriiil•l""l\~' •lif'•\JN'f Altt!t tor.N•rt••A:Mt•a"''IMW"« tt,..oiiVI'• hl,l!llj '!~\fl\ 1~c;,tlfiGI\bro~_,.,,,f~iv•ll\flit\e-altJot .ott.,\NUul!~ ~ot.tflf~Mic •._•,...-·«·"'-')~l~~~t11K',,:~C1tl ..(~I( S.an~P'f't.• IIJCW"roii 1f4 l~ ,t~!f,!Ju( f'WI'IilltJ.ri\o~tlrl 'Vf'\t«<IIAI vJ '''atf'a. l6ntt"f trtft'h. 11.. •

~ "'"' ·~ ..... u.u..c"ik,.,o.'it7ol•l• .. l•"'l' or•......C<I-•o.dboron/lkl!'la.d'"''"" ·~~.

.. Melt '"'· ·~bof ..... ~ h • fX.lltQ~-l ,

l

415

416

Shri Chhatrapati Sahakari Sakhar Karkhana Ltd, Bhavaninagar

t Report No: GESEC/2020·21/03/sil: Cltent Name and Address: Shrl Chhatrapatl Sahakarl Sakhar, Karkhana Ltd, Bhavn•nagar Tallndapur, Dlst Pune.413104

Sample Collect~ &y

Source Emi'ision Analysis Report Sr. r

Parameter Result

Ma' t•rial of Stad Ms

z. 'tad; ~c gt.t from A.lt GO Mtr.

3 type of 5 tad: Round

"'· Samplina Du~t•on l\0 Min. ---]

s flue Gas Te·nperature ·181 •I(

6. Olttetenttal Pres$i.lre • ! 4 mmW~_

1 7. JVeloC'Jty q 4JI M/s

8 D•mensoof'\\ ot~k "l Mt1 .

9. St;jlr.k Ar~a 8018 M'

10. Gas Volume 169!86.514 NM'/Hr

11. Parttcuflne Matte-r ---- $4.6 ma/NM

SuP.hur Ol0~1de tSOt) 479 fl'li/NM

0.81 Kilday

ANAlYl£0 6'1'·

,fll'lta ............. • U • ,,.,_, btdlf..,.ld l furJ'(M,e1ed:.~.t~t~IC>Iat'tu•

limits As Per -1 MPC8 Consent

i 150

S20

AUTWOilfZED SIGNATORY.

~~(>~~:-

417

-. \.....

• 5

..

Shri Chhatrapati Sahakari Sa fciwr Karkhana Ltd, Bhavaninagar

I Report No GC:~lC/20:0 2Y0l/'!_317

Client Name ano Address:

I Shri Chhatr,JPatl Sahakarl Sakhar, Karkhana ltd, Bhavninagar lz.l!.tcapur,

Oist Pune.413104

Sample Co'lertcd By

TEST CERTIFICATE l r O.l!O of Report ·r- _ 12/03/2021 -~

Date of Sampling '1~/0 3/2021 Start Date of Analysis 16/03/2021 --_-1 End Oatc of Analysis 22/03/2021 1 t;•·nple location F Boiler-35 TPH (ESP) -~ ~ample Details Stack . __ j Time of Samplins 1:45 i,r~en fnv1rosall' En&I~S & Consu1tant Pvt Ltd, Pun; :::. J

Source C:missiun Aoe~lysls Report

I Sr. l'u .meter Nu.

'l I I \lac•

2 Sta L Height from A R.

3 T ...-e cf <rack

4 Samp ing Ourattor

76

R 11 nd t

~J

t 5 Fl e uu teno~rature I II

6. r f ,,.. • al P•rHL•re 5 11

7 Jd

8. II' ~ r rarl: cl 2

q, -L 1384

10 1 C:n• Vcolume

11 Part t·ulat~ ~~elter

12. )< Die ldt" (50}l

+-2926C\fl 177

c;- 1

t ,, 6 l

13. C"' <'f•'l'l\'i'rtlV~'!'I( NOl<) .. l .:~G

Remar11111: , Ail above results are well w1th1n MPCS Lim t , ' S : • Not Specrhed

Unft(s)

Mtr.

M1n.

01(

mmWG -~ M/s ~ Mtr _,

~ NMJ/Hr I mi/NM'

~g/NM 1 +­

Ke/day _L

M

Limits As Per MPCB Consent

!:i 150

S20

AUTHORIZED SIGNATORY· \

AJ··Jp_.~

418

Sl1ri Chhatrapati Sahakari Sakhar Karkhana Ltd, Bhavaninagar

l ltep.~n No: ~tStC/2020 -21/03/1318 Cltent Name and Address:

1 Shn Chhatrapatl Sahakari Sakhar,

Kavkh;1na ltd, BhavnlnCJgar Ta llndapur,

Dist Pune.413104

TEST CERTIFICATE j 1 oate of Report --1 --22/0i/202.!_ \ Oate of sampling 15/ 03/2021

[~art Date of Analysis t 16/03/2021 End Date of Analysis_ U/03/20ll

- Be~ler-35 TPHtWet 1 Sample Location Scrul:lber)

t Sample Details .StilCk

·~en lnv1ro<afe Engmeers & COn!_ultant Pvt . ltd, Pune ~ SilmpiP. Collected By

Time of sampling 2:05 _ 1 Source Emission Analysis Report

Sr. Parameter ~o.

1 Material of Stack

2. t;t•ck H•laht f rom A R

3. Ty~ ul ~leek

4 . Samph:lll Our•uon

5 Fl .... Gas Tempc-ratu~

6 r Oiff.,rentlil l Pres~u;-7. V~IOC1ty .. 8 . Dimensions of Sto'IClt

t- 9 r Stack A~a -

Re;;.ult

i t

M•

60

1 Round

30

! n } 9 l9

A2

189S31!.399

Unlt(s)

Mtr.

M 10

•K

mmWG

_ M/s

M tr

Ml

Limits As Per MPC.B Consent

1- lO [ c;.,. Volurnot _

~ 11. Part•cuiate Mltter

I 12. Sulohur DloKide (SO,) r -~

1:\.84 1 560

49.0 f

NM •tBr mg/NM 1

~NM1

~g/day

~ 150 -i O.b8 j

113 Oxode Of N1tro~~NOX)

Remark(sl: ,. All above re~ults are "'1!11 w1thm MPCB Llm•t

N S. • Not Specif1~

ANAl YZEO BY•

........ --~ .. n..,.,.... __ _.. , . ....... ~·-1~•11dhfl'l •~··"""lRA 1lW' tftUIIUI-11!;:0w11• M tee r~ nuy dtle ~-~~t.te!Ot\~ t1'111pdM.n, MW't""'" t'l'k- li'\.1 f!PIIt'tr~ LW...,~....-or•pen ...St...,.o1 t.ml'd • ,....-..cciOa.Aor p•t. ~ ¥!0 DP rf'Urlll'd r.- 1 pcrflld If ,...,.. (ll••..,. """ -.eft~.,...,~&. _,.., m4'«t W.~••ttrw m•1111•'-'t ... , •l.s,..n• l-t,(:lltftti!!'Wftcrl t• -!11(1~· ,_.,. ,_,~ ._.,..._...,

.... , .. ~ U.MJ iP&WOt.IW tab t"" Cto~ - i,.,.. r .... m~.n~> "'tvJJ101 11.P\~~~rr.t.

c_ !>20 I

AUTHOIUZEO siGNATORY· i ---~~- · -J

~ :tllw.Mf-ftlfii"Jo"'\f

'1 %.. .......

....... ~o.. l ltilo\iy Olltlll

r

419

s.

Shri Chhatrapati Sahakari Sakhar Karkhana Ltct Bhavaninagar

SLrwy No Jdl

G GREEN ENVIROS~FE M ' •t$4{,• I

£ngin ••,. I Cor.ouftont Pvt ltd CIN Nt• U 4'

f..l•·;"" fl<•r.d• It)' Sh<1p N" lti :'nd HOOt S.H l/o1•jl rai-Sh~ur, p.,,,.,.<IJ;:>;.'OI)

I L l!l ue ec l2o•<'fl!'T1.11; ('Uff I www C~'tl<.lflC'tMIOW'• co 1'1

I'<:!(JI3Pf l4)6fi.'

I

1-- -~ Report No: tit~[C/2!!!0·21/0l/IU~

TEST CE RTIFICATE Date of Report - --~ --F-

22/03/2021 --j 15/03/2021 Client Name ana Adore:!> Date o f Sampling _ _ ~-

Shri Chhatrapatl !ahakl!rl Sakhar,

Karkhaoa ltd, Bhavninagar Tallndapur,

Start Datt> of Analysis { ~--£nd Date of Anal~--__ _

16/03/2021_ 22/03/2021 __

sample Oetal~ ETP OUTLET

Dist Pune.4l3104 ~-

N rure of sample 1 Liquid ----

[ Gre!"n En11uose~fe Engmeets & Consulto~nt P11t, ltd, Pun_e_~-----l Sample Colre-ctecl 6y

Wcitt!l Atldlysi:> l<eport Sr--...

L oar,.mtter __ l Rcst~lt ~ ~!:t~ 1._ Unlt (s) r

J Standard Method

Ph~l:al Parameter

l TOS

2. Total S~•·r.t>nded Solid ] :~: r 21: L-_ ~:: 1 APHA 2540-0

APHA 1540-C

01em'cal Parameter

_3. J. PH

4. 800 at :.-, C for 3 days '' a T ~.r;_n f) t r APHA 45()0-H' -i

~ T ~~~ ! -.. ~.~~~0~ E l 5. Otl IIIU r,reu:~e <S

6. COD 2'•·"'

7 ..:....l Sulphatn 19 13

8. l Otic•, ,' ct ... 9._) 314

Remark(~\· AI! pa•ametf!rs are within the MPCB !I ll ANALYliD BY· - -~

toiM!-.. M

tstt • ~t.ttt"dcalllldr..tt,.~totMidl

~~·moly t'll"" ~CHI "Jno.DIIctct\ ~I tlwt"-' tc'P3~ ~rtt ...,t c-., 1M • p.m •nd t.a.al. h .. u\1'!'0 IH 1c ~·' ._, • t*IOfN"~~•nll).t.y\,.hf'fcottiJ*,11md~ L

toPql.d'l..,.,..:U

600 _l mg/lit ___ APHA _i~<JE Cl B _ __

AUTJ.lORJZ£0 SIGNATORY

... b~ ... ....,., ... , .. """""'' .... I'll .. p..t:.knv PIIJIOV'Wi.hrottbfl w-rct~Cilf'IU'fl\01 .. t.N.Imy GrYc 11!'11\!!tiOII ,_m(lrrj f~IPitrlrtlf'd. Oalt'QIII~ ul th4'\AtMIIM

..-d by ( 1\ln,OWT.Indflut 1•~ I01h•4p.A(tf WI~-\!. n~•'*~~~j IJvtflll r-:t.;;tUti.Xy I»' ... ,.

·-

6 M £T 11•r•o~..-c lAb

l

l I J

I I l

420

T.C.

Shri Chhatrapati Sahakari Sakhar Karkhana Ltd, Bhavaninagar

RetO{Inostd by Mtne•trv nl E""~"'.....,l Forest & ClotN!t Chlllgt (MoEF) Govt. ollndla end ISOIIEC Hli2S 2085 (NAill) ISO 9001'2015 111d OHSAS 1SDOU007 CtrtJ ied Conti)Miy

Report~ G~SEC/1020·21/03/8320

Client Name and Address: Shrl Chhatrapatl Sahakarl Sakhar, Karkhana Ltd, Bhavnlnagar Tallndapur,

Olst Pune.4Bl04

~ample C~ll':_ctcd By

Sr. No Parameter

1. Uu'k Uen~tty

~t- 2. l pH - -3. Electrical Conduttivlty

j4. 1 Phosphate;;$ P0. ·3

5_. _ l Watu Holding Capacity 6. Organic Matter

7. t :~ldut~ as Carbonate

s ~~:il ta:es as C04

9. -1 Nat Nitrogen as N

10. z nc 11. Iron

12. Lead 13. Water Soluble Chloride 101 14. t Avallable PhosphOf'ous (P)

' ts. Organic Carbon

TEST CERTIFICATE ·- --Date of Report -,---

22/03/2021

15/0~~~1 16/03/2021

I Date of Sampling Start Date of ~lysis

End Date or Analysis I 22/03/2021

Sample ~tails Mud Press ~ Nature of sample _ . ~d __ _ 1 Green En·1110safe Engtn!"t•ts & Consultant!."'t· ~Pu~

MUD ANALYSIS REPORT Unlt(s) Result Analysis Method _ _, - --gm/cc I 1.49 IS 2720·p2

7.4 IS 2720 (Part 26)

mmhos/cm

~ 0.18 1 15:1892-

-.--mg/kg 3.17 152720

% 71.0 + IS 14765 _ % 1.7 IS 2720-P22 -----

mg/kg

t 7 .45 USEPA 3050 S

mg/ks 791 IS 2720-27 ---Mg/kg 35.16 IS 14684:1999 Reaft 2005

Mg/kg 1.9 USEPA Method 30508

Mg/kg 1.07 j USEPA Mothod 30508 -+ Mg/kg 0.47 _ ~E~e!tno~osoe mg/kg 3.82 15:812 P-4 mg/kg 2.35 IS 2720 ----" 0.091 IS27ZO P2l

-1

I ANALVZED BY- ~~- AUTH~a::_;r;:oo: l

Afv ' LN~Mrft

f~ft141f\<\(\ n,.,., -llt.tta ft·~~·llltl"d~ndnutAPS*ft to ttlf.tbtJh. l'tr 1t. hownlntftb. f •tl~iJdtpr ........ 'fto~., .. ,,.~,.._tc.nmt.t&. s.tl..,...- 11<nW tt'"*'i y.ptf"S'Mor• ,._,..f'IUc:••tttiN•f .

.t, t•~tr..1"'' t1•ar•.attw-~[l'l<'*. rl)-.h,lfl,OI'!nflllf\&ftdtlM(Mt ....... I-Otf'C"'f1 ~c,'llpUbftcltWc;ltJI~-M~Ittt1C''WIItt1PtiCGW.~ltf'll(l.tbOflll ltt"f C..l\fl t wlbfor"'MtM!'l1rNiff1li'IIDIIdi • tlJ ~t'l.ltM 1ptttioft(l( .. :-~ ~ P"ICil'tlt'ttootltG rc'l'lllr!Jo: t:.UI ~.IUii•Ctod, OIIff'QU olth-t'U.nlontftt

'; Wi" 1iCJNtn.1 J•tuth Ct~nfdfi!l11i1111yMA.It"\tf"'JhOf r P'1'\\Jfolkl••lh1n/WJ~byiU\f6nwliilnd a!A rt¥! IOtlltdP"f1YUft "''r~llt,(ft.,t~~t.lulory ra...al

'"'"'""N"M lwh.Kf.•WfloolrdLJl:br,(.uvf Df•ltW Jrvn•d..t" fYJIUJ{A1l1&DOi/OJ1<~; N

-/.

421