PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
REVISION HISTORY
Report No. Date Section Revision No. Detail of Changes
1 18.Dec.2019 All Section 0 Progress update as per cutoff date 15th December 2019
2 26.Dec.2019 All Section 0 Progress update as per cutoff date 22th December 2019
3 02.Jan.2020 All Section 0 Progress update as per cutoff date 29th December 2019
4 08.Jan.2020 All Section 0 Progress update as per cutoff date 05th January 2020
5 15.Jan.2020 All Section 0 Progress update as per cutoff date 12th January 2020
6 22.Jan.2020 All Section 0 Progress update as per cutoff date 19th January 2020
7 29.Jan.2020 All Section 0 Progress update as per cutoff date 26th January 2020
8 05.Feb.2020 All Section 0 Progress update as per cutoff date 02nd February 2020
9 12.Feb.2020 All Section 0 Progress update as per cutoff date 09th February 2020
10 26.Feb.2020 All Section 0 Progress update as per cutoff date 23th February 2020
11 04.Mar.2020 All Section 0 Progress update as per cutoff date 01th March 2020
12 11.Mar.2020 All Section 0 Progress update as per cutoff date 08th March 2020
13 18.Mar.2020 All Section 0 Progress update as per cutoff date 15th March 2020
14 26.Mar.2020 All Section 0 Progress update as per cutoff date 22th March 2020
15 08.Apr.2020 All Section 0 Progress update as per cutoff date 05th Apr 2020
16 23.Apr.2020 All Section 0 Progress update as per cutoff date 21st Apr 2020
17 08.May.2020 All Section 0 Progress update as per cutoff date 06th May 2020
18 22.May.2020 All Section 0 Progress update as per cutoff date 17th May 2020
19 05.Jun.2020 All Section 0 Progress update as per cutoff date 31th May 2020
20 17.Jun.2020 All Section 0 Progress update as per cutoff date 14th June 2020
21 24.Jun.2020 All Section 0 Progress update as per cutoff date 21th June 2020
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 3
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
22 01.Jul.2020 All Section 0 Progress update as per cutoff date 28th June 2020
23 08.Jul.2020 All Section 0 Progress update as per cutoff date 05th July 2020
24 15.Jul.2020 All Section 0 Progress update as per cutoff date 12th July 2020
25 22.Jul.2020 All Section 0 Progress update as per cutoff date 19th July 2020
26 29.Jul.2020 All Section 0 Progress update as per cutoff date 22th July 2020
27 05.Aug.2020 All Section 0 Progress update as per cutoff date 02nd August 2020
28 12.Aug.2020 All Section 0 Progress update as per cutoff date 09th August 2020
29 19.Aug.2020 All Section 0 Progress update as per cutoff date 16th August 2020
30 26.Aug.2020 All Section 0 Progress update as per cutoff date 23rd August 2020
31 02.Sep.2020 All Section 0 Progress update as per cutoff date 30th August 2020
32 09.Sep.2020 All Section 0 Progress update as per cutoff date 06th September 2020
33 14.Sep.2020 All Section 01 Progress update as per cutoff date 06th September 2020
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 4
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
TABLE OF CONTENT
PROGRESS WEEKLY REPORT NO. 032..................................................................................................... 1
REVISION HISTORY ................................................................................................................................. 2
1. EXECUTIVE SUMMARY ............................................................................................................... 5
2. AREAS OF CONCERN ................................................................................................................... 5
3. HSE STATISTIC .............................................................................................................................. 6
4. PLANNING & PROGRESS ........................................................................................................... 7
4.1 Schedule ........................................................................................................................................ 7
4.2 Progress to Date ......................................................................................................................... 7
4.3 Daily Manpower .......................................................................................................................... 7
5. MAJOR ACTIVITY DURING REPORTING PERIOD ................................................................. 9
5.1 Engineering .................................................................................................................................. 9
5.2 QA/QC ......................................................................................................................................... 10
5.3 Procurement (Material Free Issue ) ...................................................................................... 10
5.4 Construction .............................................................................................................................. 11
6. ACTIVITIES PLANNED FOR NEXT WEEK ............................................................................... 12
6.1 Engineering ................................................................................................................................ 12
6.2 QA/QC ......................................................................................................................................... 12
6.3 Procurement .............................................................................................................................. 12
6.4 Construction .............................................................................................................................. 12
7. TECHNICAL QUERIES ................................................................................................................ 12
8. VARIATION .................................................................................................................................. 13
9. ATTACHMENTS .......................................................................................................................... 13
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 5
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
1. EXECUTIVE SUMMARY
The Project A163 Crane Column & Houses Fabrication and Assembly with volume as per PO 700MT,
150MT for Crane Column, 500MT for Houses, 50MT for Steel Outfitting this project under PO no
2019/4300004494/00.estimation completion by End of Jul 2020
The content of this report includes work performed by PT. CTE between period 31 August 2020 – 06
September 2020
H404 AFT Center Vent House 6 & 7 – Continue painting 3rd coat
H402 Aft Vent House and Exhaust Gas Cleaning House (VH5 & VH8) – Continue assembly (fit up and
welding)
H405 Vent Houses 3 & 4, firemen locker – Continue assembly (fit up and welding)
H406 Vent Houses 1 & 2 – Continue assembly (fit up and welding)
H409 Battery No.1 & 2, Cold start gen room – Continue assembly (fit up and welding)
H403 Shale Shaker House – Continue prefabrication
H408 Ram Rig HPU House – Continue cutting
2. AREAS OF CONCERN
The following Areas of Concern have been identified or remain applicable during this reporting period. It
is our intention to ensure that these are mitigated / resolved as soon as practicably possible in order to
minimize or remove their impact upon the success of the Project. We look forward to working closely
with Client to assist in resolving these issues
Item Concern Mitigation
01 H404 AFT Center Vent House 6 & 7 Speed up progress painting
02 H402 Aft Vent House and Exhaust Gas
Cleaning House (VH5 & VH8) Speed up progress assembly
03 H403 Shale Shaker House Speed up progress prefabrication
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 6
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
3. HSE STATISTIC
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 7
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
4. PLANNING & PROGRESS
4.1 Schedule
4.2 Progress to Date
Overall Progress Summary Crane Column & Houses until this period :
Overall Progress Crane Column
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 8
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
Overall Progress Shale Shaker House & 7 Houses
S-curve Crane Column
S-curve Shale Shaker House & 7 Houses
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 9
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
4.3 Daily Manpower
Table below is Current Direct Manpower (Fitter & welder) for period 31 August 2020 to 06 September
2020, Total number Direct manpower, Direct manpower supporting and Indirect manpower see detail in
attachment 6.
5. MAJOR ACTIVITY DURING REPORTING PERIOD
5.1 Engineering
MTO Status :
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 10
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
Shop Drawing Status :
5.2 QA/QC
Check dimension before and after welding
Monitoring visual inspection
Monitor and provide data welder performance & repair rate
5.3 Procurement (Material Free Issue )
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 11
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
Material Receipt Status
5.4 Construction
Vent House & Shale Shaker House
H404 AFT Center Vent House 6 & 7 – Continue painting top coat
H402 Aft Vent House and Exhaust Gas Cleaning House (VH5 & VH8) – Continue assembly (fit up and
welding)
H405 Vent Houses 3 & 4, firemen locker – Continue assembly (fit up and welding)
H406 Vent Houses 1 & 2 – Continue assembly (fit up and welding)
H403 Shale Shaker House – Continue prefabrication
H408 Ram Rig HPU House – Continue cutting
H409 Battery No.1 & 2, Cold start gen room – Continue assembly (fit up and welding)
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 12
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
6 ACTIVITIES PLANNED FOR NEXT WEEK
6.1 Engineering
Plan next submission to client:
Issue drawing based on priority list
6.2 QA/QC
Monitoring visual inspection
Monitor and Provide data welder performance & repair rate
6.3 Procurement (Material Free Issue )
Plan material to receive:
-
6.4 Construction
Crane Column H761 Crane Pedestal Platform & Vertical Ladder Port - Final inspection
H762 Crane Pedestal Platform & Vertical Ladder Starboard - Final inspection
Vent House & Shale Shaker House H404 AFT Center Vent House 6 & 7 – Complete painting
H402 Aft Vent House and Exhaust Gas Cleaning House (VH5 & VH8) – Continue assembly (fit up and
welding)
H405 Vent Houses 3 & 4, firemen locker – Continue assembly (fit up and welding)
H406 Vent Houses 1 & 2 – Continue assembly (fit up and welding)
H403 Shale Shaker House – Commence assembly
H408 Ram Rig HPU House – Continue prefabrication
H409 Battery No.1 & 2, Cold start gen room – Continue assembly (fit up and welding)
H407 Bosun Store & Welding Workshop – Continue prefabrication
PT. CITRA TUBINDO ENGINEERING
Jl. Hang Kesturi VI No. 1 Kawasan Industrial Terpadu Kabil Batam, Kepulauan Riau, 29467, Indonesia Tel.: (+62) 711433 Fax: (+62) 778 711425 Web site : www.cte.co.id
Document No. A163-PT-PSR-032
Revision 01
Date 09 September 2020
Page 13
PROGRESS WEEKLY REPORT 31-08-2020 to 06-09-2020
Steel outfitting – Continue prefabrication (fit up and welding)
7 TECHNICAL QUERIES
List & Summary of Technical Query outstanding:
-
8 VARIATION
List & Summary of Variation outstanding:
-
9 ATTACHMENTS
The following attachments are included to further support the content of this report.
Attachment 1 S-Curve Crane Column
Attachment 2 Progress Report Crane Column
Attachment 3 S-Curve Shale Shaker House & 7 Houses
Attachment 4 Progress Report Houses
Attachment 5 Welder Performance Repair rate
Attachment 6 Daily Manpower
Attachment 7 Progress Picture
CTE Progress Report: KEPPEL FELS- A163:PROJECT B379 "CRANE COLUMN & PLATFORM "
Cut of Date 06-Sep-20Finish Date 30-Jun-20 Last Week This Week In-Wk Gain Status
Expected Comp. % 100,00% 100,00% 0,00%
Actual Comp. % 100,00% 100,00% 0,00%
In‐Wk & Cum PerformanceExpected & Actual Comp. %
PROGRESS PLANNED VS ACTUAL
Baseline : 100.00%
0,00%
Actual : 100.00%
Forecast : 100,00%
0,0%
2,0%
4,0%
6,0%
8,0%
10,0%
12,0%
14,0%
16,0%
0,0%
20,0%
40,0%
60,0%
80,0%
100,0%
120,0%
A163‐ KEPPEL FELS "B379 CRANE COLUMN & PLATFORM " S‐Curve
In‐Week Planned In‐week Actual In‐Week Planned (ROS R3 Forecast Delivery Date ) Cumulative Planned Cumulative Actual Cumulative Planned (ROS R3 Forecast Delivery Date )
06-Sep-20
Reporting No : 032 Date : 6-Sep-20
Project A163 / B379
Last Period This Period Up to this Period Last Period This Period Up to this Period
1 Crane Column 85% 100,00% 0,00% 100,00% 100,00% 0,00% 100,00% 0,00%
2 Steel Outfitting Crane Column 10% 100,00% 0,00% 100,00% 100,00% 0,00% 100,00% 0,00%
3 Blasting/Painting Crane Column 5% 100,00% 0,00% 100,00% 100,00% -100,00% 0,00% -100,00%
100% 90,46% 0,00% 0,00% 34,05% 0,00% 0,00% 0,00%
Last Period This Period Up to this Period Last Period This Period Up to this Period
1 60% 100,00% 0,00% 100,00% 47,38% 2,07% 49,45% -50,55%
2 Steel Outfitting Shale Shaker & Houses 10% 100,00% 0,00% 100,00% 39,39% -14,10% 25,29% -74,71%
Minus progress due to
increasing of tonnage from
73,57T to 121T
Progress Last wk 28,9T,
Progress this wk 30,6T. Gain
in wk = 1,6T (1,34%)
3 Piping 10% 66,87% 20,37% 87,24% 0,00% 0,00% -87,24%
4 Electrical Cat 1 10% 70,25% 19,81% 90,06% 0,00% 0,00% -90,06%
5 Blasting/Painting Shale Shaker & Houses 10% 67,50% 14,95% 82,45% 16,86% -5,64% 11,22% -71,23%
Minus progress due to
increasing of surface area
from 34.369m2 to 41.131m2
Progress Last wk 4430m2,
Progress this wk 5079m2.
100% 90,46% 0,00% 0,00% 34,05% -0,73% 0,00% 0,00%
Works Order No. 2019/4300004494/02 dated 23 Jan 2020
FABRICATION & ASSEMBLY CRANE COLUMN & 8 HOUSES
a b c
S/N Block Shop Dwg No. Description Weight (t)Block
weightageFit Up Welding Inspection
30% 50% 20%
1 B379 H353 Crane Foundation & 72,00 100,00% 100,00% 100,00% 100,00% 100,00%
Weightage
PLAN (%) Actual (%)
Variance (%)
Total
Total Percentage
Item Activities
Total Percentage
Shale Shaker & Houses
CTE Progress Report: KEPPEL FELS- A163 Shale Shaker Houses,7 Houses & OutfittingPROJECT B379 " SEMI SUBMERSIBLE "
Item Activities Weightage
PLAN (%) Actual (%)
Variance (%)
LINE 10. CRANE COLUMN 150 MT
a b cFit Up Welding Inspection
30% 50% 20%
1 B379 H402 186,92 24,57% 29,28% 45,10% 14,12% 88,50%
2 B379 H403 236,72 31,12% 10,20% 7,50% 0,00% 17,70%3 B379 H404 84,96 11,17% 30,00% 50,00% 20,00% 100,00%4 B379 H405 56,77 7,46% 24,00% 40,00% 10,00% 74,00%5 B379 H406 26,45 3,48% 30,00% 50,00% 12,00% 92,00%6 B379 H407 14,56 1,91% 6,00% 0,00% 0,00% 6,00%7 B379 H408 141,04 18,54% 2,40% 0,00% 0,00% 2,40%8 B379 H409 13,27 1,74% 30,00% 50,00% 20,00% 100,00%
760,68 100,00% 17,64% 24,60% 7,22% 49,45%
Cutting 5% Fit-up 25% Weld/Grind 50% Inspection 10% Owner/Class 10%
1 B379 H414 R2Vertical Ladders and Platform
at AFT Vent House 11,37 8,40% 0,00%
2 B379 H415 R2Equipment Foundation In AFT
Vent & Gas cleaning Houses4,07 3,01% 0,00%
3 B379 H416 R1Equipment Foundation In
Port & STBD Vent Houses5,34 3,95% 0,00%
4 B379 H417 R2 Trolley Beams In Vent Houses 3,54 2,62% 0,00%
5 B379 H418 R1Weather Tight Hatch and
Handrails on Deckhouse Roof7,51 5,54% 0,00%
6 B379 H613 R0Choke and Kill Manifold
Foundation in Ramrig HPU0,93 0,68% 0,00%
7 B379 H702 R3
Location Plan ‐ Schedule of
W.T. and WE.T Doors for
Upper Hull (All)
0,66 0,49% 0,00%
8 B379 H720 R2Engine Exhaust Pipe Support
(Aft)16,89 12,47% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00%
9 B379 H734 R1Mud Trough & Gate Detail In
Shaker House8,82 6,51% 0,00%
10 B379 H759 R2
Burner Boom Foundation
reinforcement and boom rest
( P/S)
10,79 7,97% 0,00%
11 B379 H761 R1Crane Pedestal Platform &
Vertical Ladder Port7,29 5,39% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00%
12 B379 H762 R2Crane Pedestal Platform &
Vertical Ladder Starboard7,28 5,38% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00%
13 B379 H768 R1Equipment Foundations In
Shale Shaker House1,46 1,08% 0,00%
14 B379 H769 R1Platforms Details In Shale
Shaker House7,30 5,39% 70,00% 70,00% 70,00% 70,00% 40,00% 63,00%
15 B379 H770 R2Inclined Ladder In Shale
Shaker House2,40 1,78% 100,00% 100,00% 100,00% 100,00% 90,00% 90,00%
16 B379 H771 R1Mud Chute & Splash Guard In
Shale Shaker House6,47 4,78% 0,00%
17 B379 H781 R2Equipment Foundations Shale
Shaker House (Tween Deck)0,00 0,00% 0,00%
18 B379 H793 R1Location & Detail of Padeye in
Shale Shaker House2,28 1,69% 0,00%
19 B379 H806 R1 Crane Boom Rest 6,90 5,10% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00%
20 B379 H865 R2Trolley Beam in Shale Shaker
House1,93 1,43% 0,00%
21 B379 H866 R1Trip tank in shale shaker
house3,77 2,78% 0,00%
22 B379 H868 R1Staircase Outside Shale
Shaker House9,71 7,17% 0,00%
23 B379 H880 R0Equipment Foundation in
Ramrig Swb Room1,01 0,75% 0,00%
24 B379 H881 R1Equipment Foundation in
Ramrig HPU Room4,30 3,18% 0,00%
25 B379 H882 R0Trolley Beam and Padeye in
RAMRIG HPU Room3,35 2,47% 0,00%
135,41 100% 39,39% 33,33%
DescriptionNett Weight (t)
A
Block weightage
C
Fabrication
Block
weightageWeight (t) Total
Last Week This WeekRev
Ram Rig HPU House
Deck House for Battery Room No.1 & 2, Cold Start
Description
Shale Shaker House
AFT Center Vent House (VH6 & VH7)
Vent Houses 3 & 4, firemen locker
Vent Houses 1 & 2
Bosun Store & Welding Workshop
Aft Vent House and Exhaust Gas Cleaning House (Vent
House 5&8)
SN Shop Dwg No.Block
Shop Dwg No.Block
LINE 30. STEEL OUTFITTING 50 MT
LINE 20. HOUSES 500 MT
S/N
Washing Blasting 1st Coat 2nd Coat Final Coat Inspection
10% 40% 10% 10% 20% 10%
1 A163 B379 - H402 8986,656 21,07% 0,00%
2 A163 B379 - H403 14372,9556 33,69% 0,00%
3 A163 B379 - H404 4623,216 10,84% 100,00% 100,00% 100,00% 100,00% 100,00% 90,00%
4 A163 B379 - H405 2251,063 5,28% 0,00%
5 A163 B379 - H406 1361,532 3,19% 0,00%
6 A163 B379 - H407 1070,688 2,51% 0,00%
7 A163 B379 - H408 4958,232 11,62% 0,00%
8 A163 B379 - H409 651,132 1,53% 0,00%
9 A163 B379 - H414 449,1 1,05% 0,00%
10 A163 B379 - H415 246,336 0,58% 0,00%
11 A163 B379 - H416 227,58 0,53% 0,00%
12 A163 B379 - H417 143,04 0,34% 0,00%
13 A163 B379 - H702 22,452 0,05% 0,00%
14 A163 B379 - H720 454,512 1,07% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00%
15 A163 B379 - H734 169,236 0,40% 0,00%
16 A163 B379 - H759 130,26 0,31% 0,00%
17 A163 B379 - H768 21,744 0,05% 0,00%
18 A163 B379 - H769 336,156 0,79% 0,00%
19 A163 B379 - H770 156,912 0,37% 0,00%
20 A163 B379 - H771 277,824 0,65% 0,00%
21 A163 B379 - H793 63,876 0,15% 0,00%
22 A163 B379 - H353 1058,82 2,48% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00%
23 A163 B379 - H761 223,152 0,52% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00%
24 A163 B379 - H762 243,9 0,57% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00%
25 B379 - H806 157,01 0,37% 0,00%
42657,385 100% 12,89% 14,40%
S/N CTE Project No Keppel Project No Total Survace
Mud Chute & Splash Guard In Shale Shaker House
Location & Detail of Padeye in Shale Shaker House
Crane Foundation & Reinforcement
Crane Pedestal Platform & Vertical Ladder Port
VH5 & VH8
Shale Shaker House
VH6 & VH7
VH3 & VH4
VH1 & VH2
Bosun Store & Welding Workshop
RamRig HPU
Battery Room 1 & 2, Start Cool Gen Set
Vertical Ladders and Platform at AFT Vent House
Equipment Foundation In AFT Vent & Gas cleaning Houses
Equipment Foundation In Port & STBD Vent Houses
Distribution (%)
Activity
Last week Progress
Progress to-date
Crane Boom Rest
Painting
Crane Pedestal Platform & Vertical Ladder Starboard
Mud Trough & Gate Detail In Shaker House
Burner Boom Foundation reinforcement and boom rest ( P/S)
Equipment Foundations In Shale Shaker House
Platforms Details In Shale Shaker House
Inclined Ladder In Shale Shaker House
Trolley Beams In Vent Houses
Location Plan - Schedule of W.T. and WE.T Doors for Upper Hull (All)
Engine Exhaust Pipe Support (Aft)
Project Name
CTE Progress Report: KEPPEL FELS- A163:PROJECT B379 " SHALE SHAKER HOUSE & 7 HOUSES "
Cut of Date 06-Sep-20Finish Date 30-Aug-20 Last Week This Week In-Wk Gain Status
Expected Comp. % 100,00% 100,00% 0,00%
Actual Comp. % 30,15% 29,52% -0,63%
In‐Wk & Cum PerformanceExpected & Actual Comp. %
PROGRESS PLANNED VS ACTUAL
Baseline : 100.00%
Actual : 29,52%
Forecast Planned : 100,00%
0,0%
2,0%
4,0%
6,0%
8,0%
10,0%
12,0%
14,0%
16,0%
0,0%
20,0%
40,0%
60,0%
80,0%
100,0%
120,0%
A163‐ KEPPEL FELS "B379 SHALE SHAKER HOUSE & 7 HOUSES " S‐Curve
In‐Week Planned In‐week Actual In‐Week Planned (ROS R3 Forecast Delivery Date ) Cumulative Planned Cumulative Actual Cumulative Planned (ROS R3 Forecast Delivery Date )
06-Sep-20
PROJECT NAME : Structural Steel & Block Fabrication Services DATE :CLIENT : Keppel FELS Limited LOCATION :JOB No. : A-163
###### 01-Sep 02-Sep 03-Sep 04-Sep 05-Sep 06-Sep
to )
Elo
ng
ated
C
avit
y (E
C)
Cra
ter
Pip
e (C
P)
Gas
po
re (
GP
)
Lac
k o
f R
oo
t F
usi
on
(L
R)
Lac
k o
f
Fu
sio
n (
LO
F)
Incl
usi
on
(IN
)
Lin
ear
Po
rosi
ty (
PL
)
Lo
caliz
ed
Po
rosi
ty (
PG
)R
oo
t C
on
cavi
ty
(SR
C)
Tu
ng
sten
In
clu
sio
n (
IT)
Inco
mp
lete
R
oo
t P
enet
rati
on
Sla
g
Elo
ng
ated
C
avit
y (E
C)
Cra
ter
Pip
e (C
P)
Gas
po
re (
GP
)
Lac
k o
f R
oo
t F
usi
on
(L
R)
Lac
k o
f
Fu
sio
n (
LO
F)
Incl
usi
on
(IN
)
Lin
ear
Po
rosi
ty (
PL
)
Lo
caliz
ed
Po
rosi
ty (
PG
)
Bu
rn T
hro
ug
ht
(BT
)
Tu
ng
sten
In
clu
sio
n (
IT)
Inco
mp
lete
R
oo
t P
enet
rati
on
Sla
g
DNC DNC
1 A-163 W 146 ISNEN FCAW-GS ACTIVE 9 1 8704 70 11% 0,8% 70
9 A-163 W 645 AMRIZAL SMAW FCAW-GS ACTIVE 10 4 37522 895 40% 2,4% 895
10 A-163 W 674 FARIAS AHKRAMEL RAFKI SMAW ACTIVE 1 1 3226 300 100% 9,3% 300
14 A-163 W 703 SEDIYO PAMUNGKAS SAW ACTIVE 16 2 20877 240 13% 1,1% 40 200
18 A-163 W 709 LISTON SILABAN FCAW-GS NOT ACTIVE 5 3 34974 320 60% 0,9% 100 220
19 A-163 W 721 ANDRA ALTA SMAW ACTIVE 14 5 51383 575 36% 1,1% 40 535
20 A-163 W 722 GIAT JUNTRIMAN SIHOMBINGFCAW-GS NOT ACTIVE 14 6 50066 1210 43% 2,4% 120 260 830
21 A-163 W 725 HERMAN SYAH SMAW ACTIVE 1 2266
22 A-163 W 726 JOEANTO SMAW FCAW-GS ACTIVE 1 2266
27 A-163 W 768 AFRIANTO FCAW-GS NOT ACTIVE 4 1 1716 150 8,7% 150
29 A-163 W 770 AHMAD RIDOAN FCAW-GS ACTIVE 22 4 29961 1270 4,2% 1270
33 A-163 W 774 ARNANDA FCAW-GS ACTIVE 5 2 16274 195 1,2% 195
35 A-163 W 776 ILMAN WARDANA NASUTIONFCAW-GS ACTIVE 1 6124
36 A-163 W 777 NAIF HAMONANGAN PANJAITANFCAW-GS ACTIVE 13 6 15632 2170 13,9% 1800
37 A-163 W 778 SARIHOT BARASA FCAW-GS ACTIVE 3 15844
38 A-163 W 779 SAROHA SIMBOLON FCAW-GS ACTIVE 6 3 9040 290 3,2% 290
44 A-163 W 192 AMRIZON SMAW+FCAW-GS ACTIVE 2 910
46 A-163 W 230 ANTONI SMAW+FCAW-GS ACTIVE 1 2063
49 A-163 W 330 SATRIA PUTRA SMAW+FCAW-GS ACTIVE 1 2063
50 A-163 W 353 SUDARMAN SMAW+FCAW-GS ACTIVE 2 1 5706 300 50% 5,3% 300
54 A-163 W 390 WAHYUDI SMAW+FCAW-GS ACTIVE 2 1 2832 350 50% 12,4% 350
56 A-163 W 424 MAIDIN SMAW+FCAW-GS ACTIVE 1 2508
59 A-163 W 586 AGUNG ERNAWAN SMAW+FCAW-GS ACTIVE 1 3180
65 A-163 W 728 RAMADHONA SMAW+FCAW-GS ACTIVE 3 1 8646 200 33% 2,3% 200
66 A-163 W 729 ANDRI SMAW+FCAW-GS ACTIVE 4 1 8918 60 25% 0,7% 60
67 A-163 W 733 NOBEL DAMANIK SMAW+FCAW-GS ACTIVE 1 800
69 A-163 W 736 AHMAT YANI SMAW+FCAW-GS ACTIVE 3 2125
71 A-163 W 738 MARCELINUS KUNU SMAW+FCAW-GS NOT ACTIVE 1 800
79 A-163 W 746 MUH. RAIS SMAW+FCAW-GS ACTIVE 1 1 1775 70 100% 3,9% 70
81 A-163 W 748ASMAN PARITO SIMATUPANG
SMAW+FCAW-GS NOT ACTIVE 1 620
88 A-163 W 755 ARIDI ASDI SMAW+FCAW-GS NOT ACTIVE 3 4791
90 A-163 W 758 OLIDI SMAW+FCAW-GS ACTIVE 3 1495
97 A-163 W 784 SIEM WADI SMAW+FCAW-GS ACTIVE 1 520
101 A-163 W 788 BUDIMAN SMAW+FCAW-GS NOT ACTIVE 1 350
103 A-163 W 790 MEGANG P.A SMAW+FCAW-GS ACTIVE 1 70
104 A-163 W 791 MUSTAGFIRIN SMAW+FCAW-GS ACTIVE 1 600
105 A-163 W 792 ZEPRIMEI SMAW+FCAW-GS ACTIVE 1 760
##### ##### #DIV/0! #DIV/0! ##### #DIV/0! ##### ##### ##### ##### #DIV/0! ##### 160 43 357407 8665 26,88% 2,42% 120 440 7735
By Joint
Structure #DIV/0!
WEEKLY WELD REPORT
ACCUMULATIVE
To
tal L
eng
th
(Tak
en)
To
tal L
eng
th
(Rep
air)
Type of Defect (mm)
% B
y Jo
int
% B
y L
eng
th
NoProject
No.
7 September 2020PT. CITRA TUBINDO ENGINEERING
Remarks
Join
t T
aken
Join
t R
epai
r
Join
t T
aken
Join
t R
epai
r
WEEKLY ( 31-Aug-20 6-Sep-20
To
tal L
eng
th
(Tak
en)
To
tal L
eng
th
(Rep
air)
% B
y Jo
int
% B
y L
eng
th
Type of Defect (mm)
RemarksBy Length By Joint By Length
STATUS
TOTAL
DISCIPLINEWEEKLY ACCUMULATIVE
Welder No.
Welder Name Welding Process
#DIV/0! 22,81% 2,41%
FM-QA-119 Page 1 of 2 Rev 03, 02-Mar-2018
PROJECT NAME : Structural Steel & Block Fabrication Services DATE :CLIENT : Keppel FELS Limited LOCATION :JOB No. : A-163
####### 01-Sep 02-Sep 03-Sep 04-Sep 05-Sep 06-Sep
to )
Elo
ngat
ed
Cav
ity (E
C)
Cra
ter
Pip
e (C
P)
Gas
por
e (G
P)
Lack
of R
oot
Fusi
on (L
R)
Lack
of
Fusi
on (L
OF)
Incl
usio
n (IN
)
Line
ar P
oros
ity
(PL)
Loca
lized
P
oros
ity (P
G)
Roo
t C
onca
vity
(S
RC
)
Tung
sten
In
clus
ion
(IT)
Inco
mpl
ete
Roo
t P
enet
ratio
n
Sla
g
Elo
ngat
ed
Cav
ity (E
C)
Cra
ter
Pip
e (C
P)
Gas
por
e (G
P)
Lack
of R
oot
Fusi
on (L
R)
Lack
of
Fusi
on (L
OF)
Incl
usio
n (IN
)
Line
ar P
oros
ity
(PL)
Loca
lized
P
oros
ity (P
G)
Bur
n Th
roug
ht
(BT)
Tung
sten
In
clus
ion
(IT)
Inco
mpl
ete
Roo
t P
enet
ratio
n
Oth
er
DNC DNC ,
1 A-163 WM-A163-XO-CTE-AD-001 % LENGTH 72 29 208937 4690 40% 2,2% 150 4540
2 A-163 WM-A163-XO-CTE-AD-002 % LENGTH 64 23 210155 5150 36% 2,5% 120 660 4370
136 52 419092 9840 38% 2% 120 810 8910
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 136 52 419092 9840 38,24% 2,35% 120 810 8910
By Joint
STRUCTURE #DIV/0! #DIV/0!
WEEKLY REJECTION RATE REPORT
ACCUMULATIVE
Tota
l Len
gth
(Tak
en)
Tota
l Len
gth
(Rep
air)
Type of Defect (mm)
% B
y Jo
int
% B
y Le
ngth
NoProject
No.
7 September 2020PT. CITRA TUBINDO ENGINEERING
Remarks
Join
t Tak
en
Join
t Rep
air
Join
t Tak
en
Join
t Rep
air
WEEKLY ( 31-Aug-20 6-Sep-20
Tota
l Len
gth
(Tak
en)
Tota
l Len
gth
(Rep
air)
% B
y Jo
int
% B
y Le
ngth
Type of Defect (mm)
ACCUMULATIVERemarks
By Length By Joint
REMARKS
By Length
TOTAL
TOTAL
DISCIPLINEWEEKLY
DRAWING NUMBER ITEM NAME CATEGORY
#DIV/0! 2,35%
FM-QA-119 Page 2 of 2 Rev 03, 02-Mar-2018
: A163-B379: KEPPEL FELS: Weekly Manpower Report: 31 August 2020 - 06 September 2020
DS NS DS NS DS NS DS NS DS NS DS NS DS NS
Direct Manpower
1 Foreman Welder 2 2 2 2 2 2 2 2 1 2 1 2 1 2 2
2 Welder GTAW / SMAW 2 1 1 1 1 1 1 1
3 Welder SMAW/FCAW 14 16 10 17 12 15 11 15 15 15 15 16 14 18 15
4 Welder SAW 2 2 2 2 2 2 2 2
5 Welder SMAW 1 1 -
6 Helper Welder -
7 Foreman Fitter 2 1 2 1 1 1 1 1 1 1 2 1 2 1 1
8 Fitter 35 10 38 10 37 10 36 10 36 10 36 10 33 10 23
9 Fitter CNC Operator 1 2 1 2 1 2 1 2 1 2 1 2 1 1 1
10 Rigger 7 1 7 1 7 1 5 1 5 1 5 1 5 1 3
11 Foreman Scaffolder 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
12 Scaffolder 8 3 8 3 10 3 12 3 12 3 12 3 12 3 7
13 Operator 3 2 3 2 3 2 3 2 2 2 3 2 3 2 2
14 Blasting and Painting 4 2 8 20 20 20 12
15 Maintenance (Mech/Elec) 2 2 2 2 2 2 3 2 3 2 3 2 3 2 2
16 Supervisor 4 4 4 4 4 4 2 4
17 Material Control 1 2 1 1 2 2 1 1
18 Store -
88 40 83 41 86 39 91 39 107 39 109 40 101 41 78
Indirect Manpower
18 Project Engineer 1 1 1 1 1 1 1
19 Construction Engineer 1 1 1 1 1 1 1
20 Lead Engineer 1 1 1 1 1 1 1
21 Welding Engineer 1 1 1 1 1 1 1
22 Planner 1 1 1 1 1 1 1
23 HSE Officer 2 1 2 1 2 1 2 1 2 1 2 1 2
24 HSE Admin 1 1 1 1 1 1 1
25 QC Welding 1 1 1 1 1 1 1 1 1 1 1 1 1
26 QC DC 1 1 1 1 1 1 1 1 1 1 1 1 1
27 Fabrication Admin 1 1 1 1 1 1 1
28 Admin Project/Doc Control 2 2 2 2 2 2 2
29 Drafter 7 7 7 7 7 7 7
20 3 20 3 20 3 20 3 20 3 20 3 107 43 20
ProjectClientDoc TitleReport Date
No Description05-Sep-20
Average in a Week
Total Direct Manpower
Total Indirect Manpower
04-Sep-2031-Aug-20 01-Sep-20 02-Sep-20 03-Sep-20 06-Sep-20
H402 ‐ Aft Vent House and Exhaust Gas Cleaning House (VH5B)
Doc. Title : Progress PicturesA163-Project B379 Fabrication of Structure and Steel Outfitting
H402 ‐ Aft Vent House and Exhaust Gas Cleaning House (VH5A)
Doc. Title : Progress PicturesA163-Project B379 Fabrication of Structure and Steel Outfitting
H402 ‐ Aft Vent House and Exhaust Gas Cleaning House (VH8A)
H402 ‐ Aft Vent House and Exhaust Gas Cleaning House (VH8B)
Doc. Title : Progress PicturesA163-Project B379 Fabrication of Structure and Steel Outfitting
H403 Shale Shaker House – Continue prefabrication
Doc. Title : Progress PicturesA163-Project B379 Fabrication of Structure and Steel Outfitting
H404 ‐ AFT Center Vent House 6 & 7
H405 ‐ Vent Houses 4
Doc. Title : Progress PicturesA163-Project B379 Fabrication of Structure and Steel Outfitting
H406 ‐ Vent Houses 1
H406 ‐ Vent Houses 2
H408 ‐ Ram Rig HPU House