Tugas 02 KL3203 15513054

download Tugas 02 KL3203 15513054

of 5

Transcript of Tugas 02 KL3203 15513054

  • 8/20/2019 Tugas 02 KL3203 15513054

    1/8

    TUGAS II

    KL3203 PROSES PANTAI

    PROGRAM STUDI TEKNIK KELAUTAN

    FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN

    INSTITUT TEKNOLOGI BANDUNG

    2016

     Nama : Layli Rahmania Yuwono

     NIM : 15513054

    Dosen : Entin A. Karjadi, Ph.D

  • 8/20/2019 Tugas 02 KL3203 15513054

    2/8

    Tugas 2 KL3202 15513054 1 

    1.  Data pasang surut Suralaya DISHIDROS TNI-AL 2 Januari  –  1 Februari 2011. 

    Tanggal lahir : 2

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    2 0.5 0.5 0.6 0.7 0.8 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.5 0.5 0.5 0.4 0.4 0.3 0.4

    3 0.4 0.5 0.5 0.6 0.7 0.8 0.9 0.9 0.9 0.8 0.8 0.7 0.6 0.6 0.6 0.5 0.5 0.6 0.6 0.5 0.5 0.4 0.4 0.3

    4 0.4 0.4 0.5 0.5 0.7 0.8 0.9 0.9 0.9 0.9 0.8 0.7 0.7 0.6 0.6 0.5 0.5 0.6 0.6 0.6 0.5 0.5 0.4 0.3

    5 0.3 0.4 0.4 0.5 0.6 0.7 0.8 0.9 1 0.9 0.8 0.7 0.7 0.6 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.5 0.4 0.4

    6 0.3 0.3 0.4 0.4 0.5 0.7 0.8 0.9 1 0.9 0.9 0.8 0.7 0.6 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.6 0.5 0.4

    7 0.4 0.3 0.4 0.4 0.5 0.6 0.7 0.9 0.9 0.9 0.9 0.8 0.7 0.6 0.5 0.5 0.5 0.5 0.6 0.6 0.7 0.7 0.6 0.5

    8 0.4 0.4 0.4 0.4 0.5 0.6 0.7 0.8 0.9 0.9 0.9 0.8 0.7 0.6 0.5 0.5 0.5 0.5 0.5 0.6 0.7 0.7 0.7 0.6

    9 0.5 0.4 0.4 0.4 0.5 0.5 0.6 0.7 0.8 0.9 0.9 0.8 0.7 0.6 0.5 0.4 0.4 0.5 0.5 0.6 0.6 0.7 0.7 0.6

    10 0.6 0.5 0.4 0.4 0.5 0.5 0.6 0.7 0.8 0.9 0.9 0.8 0.7 0.6 0.5 0.4 0.4 0.4 0.5 0.5 0.6 0.7 0.7 0.7

    11 0.6 0.6 0.5 0.5 0.5 0.5 0.6 0.7 0.8 0.8 0.9 0.8 0.7 0.6 0.5 0.4 0.4 0.4 0.5 0.5 0.6 0.7 0.7 0.7

    12 0.7 0.6 0.6 0.5 0.5 0.6 0.6 0.7 0.8 0.8 0.8 0.8 0.7 0.6 0.5 0.4 0.4 0.4 0.4 0.4 0.5 0.6 0.6 0.7

    13 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.7 0.7 0.8 0.8 0.8 0.7 0.7 0.6 0.5 0.4 0.3 0.4 0.4 0.4 0.5 0.6 0.6

    14 0.7 0.7 0.7 0.6 0.6 0.6 0.7 0.7 0.7 0.8 0.8 0.8 0.7 0.7 0.6 0.5 0.4 0.4 0.3 0.4 0.4 0.5 0.5 0.6

    15 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.7 0.7 0.6 0.5 0.5 0.4 0.4 0.4 0.4 0.4 0.5 0.5

    16 0.6 0.6 0.7 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.7 0.6 0.6 0.5 0.5 0.4 0.4 0.4 0.4 0.4 0.4

    17 0.5 0.6 0.6 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.7 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.4 0.4 0.4 0.4

    18 0.4 0.5 0.5 0.6 0.7 0.8 0.9 0.9 0.8 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.5 0.4 0.4 0.3

    19 0.4 0.4 0.5 0.6 0.7 0.8 0.9 0.9 0.9 0.8 0.7 0.7 0.6 0.6 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.5 0.4 0.3

    20 0.3 0.4 0.4 0.5 0.6 0.7 0.8 0.9 0.9 0.9 0.8 0.7 0.6 0.5 0.5 0.5 0.5 0.6 0.6 0.7 0.7 0.6 0.5 0.4

    21 0.3 0.3 0.4 0.4 0.5 0.7 0.8 0.9 1 0.9 0.8 0.7 0.6 0.5 0.5 0.5 0.5 0.5 0.6 0.7 0.7 0.7 0.6 0.5

    22 0.4 0.3 0.3 0.4 0.5 0.6 0.7 0.9 0.9 0.9 0.9 0.7 0.6 0.5 0.4 0.4 0.4 0.5 0.6 0.7 0.7 0.7 0.7 0.6

    23 0.5 0.4 0.3 0.4 0.4 0.5 0.7 0.8 0.9 0.9 0.9 0.8 0.6 0.5 0.4 0.4 0.4 0.4 0.5 0.6 0.7 0.8 0.8 0.7

    24 0.6 0.5 0.4 0.4 0.4 0.5 0.6 0.7 0.9 0.9 0.9 0.8 0.7 0.5 0.4 0.4 0.3 0.4 0.5 0.6 0.7 0.8 0.8 0.7

    25 0.7 0.5 0.5 0.4 0.4 0.5 0.6 0.7 0.8 0.9 0.9 0.8 0.7 0.6 0.4 0.4 0.3 0.3 0.4 0.5 0.6 0.7 0.8 0.8

    26 0.7 0.6 0.5 0.5 0.5 0.5 0.6 0.7 0.7 0.8 0.8 0.8 0.7 0.6 0.5 0.4 0.3 0.3 0.4 0.4 0.5 0.6 0.7 0.7

    27 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.7 0.7 0.8 0.8 0.8 0.7 0.6 0.5 0.4 0.3 0.3 0.3 0.4 0.5 0.6 0.6 0.7

    28 0.7 0.7 0.7 0.7 0.6 0.6 0.6 0.7 0.7 0.7 0.8 0.8 0.7 0.6 0.6 0.5 0.4 0.4 0.3 0.4 0.4 0.5 0.6 0.6

    29 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.6 0.6 0.5 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.5

    30 0.6 0.6 0.7 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.4 0.5

    31 0.5 0.6 0.6 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.4 0.4 0.4 0.4

    1 0.5 0.5 0.6 0.6 0.7 0.8 0.8 0.9 0.8 0.8 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.4 0.4

    2. 

    Seri Waktu Elevasi Muka Air  

    Lokasi : Suralaya

    Lintang : 05o52'.2 S (S)

    Bujur : 106o02'.0 T (E)

    Tanggal : 2-31 Januari 2011

    Waktu pengamatan : 01.00  –  24.00

    Pengambilan data : satu jam sekali

  • 8/20/2019 Tugas 02 KL3203 15513054

    3/8

    Tugas 2 KL3202 15513054 2 

    3.  Menentukan 9 komponen pasang surut utama. 

    Komponen pasang-surut Suralaya yang didapatkan oleh program ERGTIDE : 

    KONSTITUEN PERIODA

    (Hour)

    AMPLITUDO

    (cm)

    BEDA FASA

    M2 12.42 12.02 89.21

    S2 12 9.56 -77.83

    N2 12.66 2.13 152.99

    K2 11.97 3.03 -77.97

    K1 23.93 12.67 74.61

    O1 25.82 6.27 126.76

    P1 24.07 3.33 -9.1

    M4 6.21 0.72 237.78

    MS4 6.10 0.97 48.44

    SO 60.11

    4.  Time Series per-komponen untuk selama 1 bulan 

    Data Elevasi Muka Air (dalam cm) yang didapat dari nilai fasa (φk), amplitudo (Ak), dan perioda

    (Tk) :

    1 bulan = 31 hari x 24 jam = 744 jam 

    Ak 12.02 9.56 2.13 3.03 12.67 6.27 3.33 0.72 0.97

    Tk 12.42 12 12.66 11.97 23.93 25.82 24.07 6.21 6.1

    ɸk 89.21 -77.83 153 -77.97 74.61 126.8 -9.1 237.8 48.44

    t

    (jam)M2 S2 N2 K2 K1 O1 P1 M4 MS4

    1 54.431 66.528 57.981 62.142 60.187 55.258 63.423 60.423 59.819

    2 50.009 69.211 58.263 62.995 56.895 54.444 63.223 60.826 59.167

    3 48.117 69.455 58.991 63.071 53.825 53.964 62.812 60.556 59.430

    4 49.230 67.195 59.989 62.350 51.185 53.846 62.218 59.868 60.353

    5 53.068 63.037 61.016 61.026 49.156 54.097 61.481 59.407 61.040

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

            0        2        4

            4        8

            7        2

            9        6

            1        2        0

            1        4        4

            1        6        8

            1        9        2

            2        1        6

            2        4        0

            2        6        4

            2        8        8

            3        1        2

            3        3        6

            3        6        0

            3        8        4

            4        0        8

            4        3        2

            4        5        6

            4        8        0

            5        0        4

            5        2        8

            5        5        2

            5        7        6

            6        0        0

            6        2        4

            6        4        8

            6        7        2

            6        9        6

            7        2        0

            7        4        4

       E   l  e  v  a  s   i   M  u   k  a   A   i  r   (

      m   )

    t (jam)

    Elevasi Muka AirSuralaya, 2 Januari - 1 Februari 2011 Time Series EMA

  • 8/20/2019 Tugas 02 KL3203 15513054

    4/8

    Tugas 2 KL3202 15513054 3 

    ... ... ... ... ... ... ... ... ... ...

    740 65.843 51.009 61.633 57.712 68.738 66.362 59.453 60.429 59.195

    741 70.244 50.765 62.158 58.962 66.034 66.063 60.318 60.826 59.362

    742 72.107 53.025 62.189 60.522 62.924 65.414 61.168 60.551 60.255

    743 70.964 57.183 61.719 61.971 59.621 64.452 61.947 59.861 61.007

    744 67.102 62.125 60.860 62.919 56.352 63.234 62.602 59.405 60.888

    Untuk mendapatkan elevasi muka air dengan komponen yang ditentukan adalah dengan

     persamaan sebagai berikut :

    = + cos +  

    a)  Seri Waktu Masing-masing Komponen

    0

    20

    40

    60

    80

            0        2        4

            4        8

            7        2

            9        6

            1        2        0

            1        4        4

            1        6        8

            1        9        2

            2        1        6

            2        4        0

            2        6        4

            2        8        8

            3        1        2

            3        3        6

            3        6        0

            3        8        4

            4        0        8

            4        3        2

            4        5        6

            4        8        0

            5        0        4

            5        2        8

            5        5        2

            5        7        6

            6        0        0

            6        2        4

            6        4        8

            6        7        2

            6        9        6

            7        2        0

            7        4        4

       E   M   A   (  c  m   )

    t (jam)

    Pasut Komponen M2 Pasut Komponen M2

    0

    20

    40

    60

    80

            0        2        4

            4        8

            7        2

            9        6

            1        2        0

            1        4        4

            1        6        8

            1        9        2

            2        1        6

            2        4        0

            2        6        4

            2        8        8

            3        1        2

            3        3        6

            3        6        0

            3        8        4

            4        0        8

            4        3        2

            4        5        6

            4        8        0

            5        0        4

            5        2        8

            5        5        2

            5        7        6

            6        0        0

            6        2        4

            6        4        8

            6        7        2

            6        9        6

            7        2        0

            7        4        4

       E

       M   A   (  c  m   )

    t (jam)

    Pasut Komponen S2 Pasut Komponen S2

    56

    58

    60

    62

    64

            0        2        4

            4        8

            7        2

            9        6

            1        2        0

            1        4        4

            1        6        8

            1        9        2

            2        1        6

            2        4        0

            2        6        4

            2        8        8

            3        1        2

            3        3        6

            3        6        0

            3        8        4

            4        0        8

            4        3        2

            4        5        6

            4        8        0

            5        0        4

            5        2        8

            5        5        2

            5        7        6

            6        0        0

            6        2        4

            6        4        8

            6        7        2

            6        9        6

            7        2        0

            7        4        4

       E   M   A   (  c  m   )

    t (jam)

    Pasut Komponen N2 Pasut Komponen N2

    0

    20

    40

    60

    80

            0        2        4

            4        8

            7        2

            9        6

            1        2        0

            1        4        4

            1        6        8

            1        9        2

            2        1        6

            2        4        0

            2        6        4

            2        8        8

            3        1        2

            3        3        6

            3        6        0

            3        8        4

            4        0        8

            4        3        2

            4        5        6

            4        8        0

            5        0        4

            5        2        8

            5        5        2

            5        7        6

            6        0        0

            6        2        4

            6        4        8

            6        7        2

            6        9        6

            7        2        0

            7        4        4

       E   M   A   (  c  m   )

    t (jam)

    Pasut Komponen S2 Pasut Komponen K2

  • 8/20/2019 Tugas 02 KL3203 15513054

    5/8

    Tugas 2 KL3202 15513054 4 

     b)  Seri waktu elevasi muka air dari penjumlahan 9 komponen pasang surut (konstituen)

    0

    20

    40

    60

    80

            0        2        4

            4        8

            7        2

            9        6

            1        2        0

            1        4        4

            1        6        8

            1        9        2

            2        1        6

            2        4        0

            2        6        4

            2        8        8

            3        1        2

            3        3        6

            3        6        0

            3        8        4

            4        0        8

            4        3        2

            4        5        6

            4        8        0

            5        0        4

            5        2        8

            5        5        2

            5        7        6

            6        0        0

            6        2        4

            6        4        8

            6        7        2

            6        9        6

            7        2        0

            7        4        4

       E   M   A   (  c  m   )

    t (jam)

    Pasut Komponen K1 Pasut Komponen K1

    0

    20

    40

    60

    80

            0        2        4

            4        8

            7        2

            9        6

            1

            2        0

            1

            4        4

            1

            6        8

            1

            9        2

            2

            1        6

            2

            4        0

            2

            6        4

            2

            8        8

            3

            1        2

            3

            3        6

            3

            6        0

            3

            8        4

            4

            0        8

            4

            3        2

            4

            5        6

            4

            8        0

            5

            0        4

            5

            2        8

            5

            5        2

            5

            7        6

            6

            0        0

            6

            2        4

            6

            4        8

            6

            7        2

            6

            9        6

            7

            2        0

            7

            4        4

       E   M   A   (  c  m   )

    t (jam)

    Pasut Komponen O1 Pasut Komponen O1

    56

    58

    60

    62

    64

            0        2        4

            4        8

            7        2

            9        6

            1        2        0

            1        4        4

            1        6        8

            1        9        2

            2        1        6

            2        4        0

            2        6        4

            2        8        8

            3        1        2

            3        3        6

            3        6        0

            3        8        4

            4        0        8

            4        3        2

            4        5        6

            4        8        0

            5        0        4

            5        2        8

            5        5        2

            5        7        6

            6        0        0

            6        2        4

            6        4        8

            6        7        2

            6        9        6

            7        2        0

            7        4        4

       E   M   A   (  c  m   )

    t (jam)

    Pasut Komponen P1 Pasut Komponen P1

    59

    59.5

    60

    60.5

    61

            0        2        4

            4        8

            7        2

            9        6

            1        2        0

            1        4        4

            1        6        8

            1        9        2

            2        1        6

            2        4        0

            2        6        4

            2        8        8

            3        1        2

            3        3        6

            3        6        0

            3        8        4

            4        0        8

            4        3        2

            4        5        6

            4        8        0

            5        0        4

            5        2        8

            5        5        2

            5        7        6

            6        0        0

            6        2        4

            6        4        8

            6        7        2

            6        9        6

            7        2        0

            7        4        4

       E   M   A   (  c  m   )

    t (jam)

    Pasut Komponen M2 Pasut Komponen M4

    59

    60

    61

    62

            0        2        4

            4        8

            7        2

            9        6

            1        2        0

            1        4        4

            1        6        8

            1        9        2

            2        1        6

            2        4        0

            2        6        4

            2        8        8

            3        1        2

            3        3        6

            3        6        0

            3        8        4

            4        0        8

            4        3        2

            4        5        6

            4        8        0

            5        0        4

            5        2        8

            5        5        2

            5        7        6

            6        0        0

            6        2        4

            6        4        8

            6        7        2

            6        9        6

            7        2        0

            7        4        4

       E   M   A   (  c  m   )

    t (jam)

    Pasut Komponen MS4 Pasut Komponen MS4

  • 8/20/2019 Tugas 02 KL3203 15513054

    6/8

    Tugas 2 KL3202 15513054 5 

    5.  Menentukan Tipe Pasang Surut 

    Untuk menentukan tipe pasang surut yang

    terjadi ditentukan Formzhal Number .

    Fromzhal

    Number

    (F)

    Tide

    Classification

    0  –  0,25 Semi Diurnal

    0,25  –  1,5 Mixed,

    mainly Semi

    Diurnal

    1,5  –  3,0 Mixed,

    mainlyDiurnal

    3,0 Diurnal

    =  +    +

     

    =12.67 + 6.7

    12.02 + 9.56= 0.898 

     Nilai bilangan Formzhal pada area

    Suralaya adalah 0.898 yang berada diantara 0.25 sampai 1.5. Oleh karena itu

     pasang surut pada area ini bertipe mixed,

    mainly semi diurnal . Dalam satu hari

     pasang surut terjadi dengan pola terjadi

    dua kali air pasang dan dua kali air surut,

    tetapi tinggi dan periodenya berbeda.

    Berikut merupakan elevasi muka air

    selama 72 jam yang diambil dari

     potongan sketsa plot ketinggian muka air

    dari DISHIDROS TNI-AL selama satu

     bulan yang menunjukkan tipe pasang

    surut campuran condong ke diurnal  di

     perairan Suralaya :

    0

    2040

    60

    80

    100

    120

            0        2        4

            4        8

            7        2

            9        6

            1        2        0

            1        4        4

            1        6        8

            1        9        2

            2        1        6

            2        4        0

            2        6        4

            2        8        8

            3        1        2

            3        3        6

            3        6        0

            3        8        4

            4        0        8

            4        3        2

            4        5        6

            4        8        0

            5        0        4

            5        2        8

            5        5        2

            5        7        6

            6        0        0

            6        2        4

            6        4        8

            6        7        2

            6        9        6

            7        2        0

            7        4        4

       E   M

       A   (  c  m   )

    t (jam)

    Time Series 9 Komponen Time Series 9 Komponen

    Surut

    Pasang

    Surut

    Pasang

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

            0        2        4

            4        8

            7        2

       E   l  e  v  a  s   i   M  u   k  a   A   i  r   (  m   )

    t (jam)

    Elevasi Muka AirSuralaya, 3 - 5 Januari 2011

  • 8/20/2019 Tugas 02 KL3203 15513054

    7/8

    Tugas 2 KL3202 15513054 6 

    6.  Peramalan elevasi pasang surut selama 18.6 tahun 

    Dengan program ERGRAM didapatkan ramalan elevasi muka air selama 18.6 tahun (163.272

     jam).

    (18 ℎ 365 ℎ + 4 31 ℎ + 2 30 ℎ

    + 1 28 ℎ + 21 ℎ) 24 = 163.272  Berikut hasil ramalan selama 15 hari yang dicuplik dari hasil pengolahan data oleh program

    ERGRAM :

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    32 0.5 0.5 0.6 0.6 0.7 0.8 0.8 0.9 0.8 0.8 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.4 0.4

    33 0.4 0.4 0.5 0.6 0.7 0.8 0.8 0.9 0.9 0.8 0.8 0.7 0.6 0.6 0.5 0.5 0.5 0.6 0.6 0.6 0.6 0.5 0.5 0.4

    34 0.4 0.4 0.4 0.5 0.6 0.7 0.8 0.9 0.9 0.8 0.8 0.7 0.6 0.5 0.5 0.5 0.5 0.6 0.6 0.7 0.6 0.6 0.5 0.4

    35 0.4 0.4 0.4 0.5 0.6 0.7 0.8 0.9 0.9 0.9 0.8 0.7 0.6 0.5 0.5 0.5 0.5 0.5 0.6 0.7 0.7 0.7 0.6 0.5

    36 0.4 0.4 0.4 0.4 0.5 0.6 0.7 0.8 0.9 0.9 0.8 0.7 0.6 0.5 0.4 0.4 0.5 0.5 0.6 0.7 0.7 0.7 0.7 0.6

    37 0.5 0.4 0.4 0.4 0.5 0.6 0.7 0.8 0.9 0.9 0.8 0.7 0.6 0.5 0.4 0.4 0.4 0.5 0.6 0.7 0.7 0.8 0.7 0.6

    38 0.5 0.5 0.4 0.4 0.5 0.6 0.7 0.8 0.8 0.9 0.8 0.7 0.6 0.5 0.4 0.4 0.4 0.4 0.5 0.6 0.7 0.8 0.8 0.7

    39 0.6 0.5 0.5 0.4 0.5 0.6 0.7 0.7 0.8 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.3 0.4 0.5 0.6 0.7 0.8 0.8 0.8

    40 0.7 0.6 0.5 0.5 0.5 0.6 0.6 0.7 0.8 0.8 0.8 0.8 0.6 0.5 0.4 0.3 0.3 0.3 0.4 0.5 0.6 0.7 0.8 0.8

    41 0.7 0.6 0.6 0.5 0.5 0.6 0.6 0.7 0.8 0.8 0.8 0.8 0.7 0.5 0.4 0.3 0.3 0.3 0.4 0.5 0.6 0.7 0.7 0.8

    42 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.7 0.8 0.8 0.8 0.8 0.7 0.6 0.4 0.4 0.3 0.3 0.3 0.4 0.5 0.6 0.7 0.7

    43 0.7 0.7 0.7 0.6 0.6 0.6 0.7 0.7 0.7 0.8 0.8 0.8 0.7 0.6 0.5 0.4 0.3 0.3 0.3 0.4 0.5 0.5 0.6 0.7

    44 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.8 0.8 0.7 0.7 0.6 0.5 0.5 0.4 0.4 0.4 0.4 0.4 0.5 0.5 0.6

    45 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.5 0.5

    46 0.6 0.6 0.6 0.7 0.7 0.8 0.8 0.8 0.8 0.7 0.7 0.7 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.4 0.4 0.4

    Hasil ramalan elevasi muka air selama 18,6 tahun tersebut menjadi input program ERGELV  

    elevasi-elevasi penting pasang surut pada stasiun Suralaya. Elevasi tersebut adalah sebagai berikut :

    a)   Nilai Elevasi-elevasi Penting (cm)

    Elevasi Muka Air (cm)Jumlah

    Kejadian

    Highest Water Spring (HWS ) 98.63 1

    Mean High Water Spring (MHWS) 92.53 459

    Mean High Water Level (MHWL) 77.74 12371

    Mean Sea Level (MSL ) 60.11 163272

    Mean Low Water Level (MLWL) 44.03 12366

    Mean Low Water Spring (MLWS) 25.05 459

    Lowest Water Spring (LWS ) 15.34 1

     b)   Nilai elevasi-elevasi penting diikatkan

     pada MSL (cm)

    Elevasi Muka Air (cm)Jumlah

    Kejadian

    Highest Water Spring (HWS ) 38.52 1

    Mean High Water Spring (MHWS) 32.42 459

    0

    20

    40

    60

    80

    100

    0 24 48 72 96 120 144 168 192 216 240 264 288 312 336 360 384

       K  e   t   i  n  g  g   i  a  n   M  u   k  a   A   i  r

       (  c  m   )

    t (jam)

    Hasil Peramalan Pasang Surut Suralaya

    Hari ke-32 s.d 46

    EMA

  • 8/20/2019 Tugas 02 KL3203 15513054

    8/8

    Tugas 2 KL3202 15513054 7 

    Mean High Water Level (MHWL) 17.63 12371

    Mean Sea Level (MSL ) 0 163272

    Mean Low Water Level (MLWL) -16.08 12366

    Mean Low Water Spring (MLWS) -35.06 459

    Lowest Water Spring (LWS ) -44.77 1

    Tunggang pasang : 83.29 cm