Tahun ke- Tahun Jumlah Penduduk (Jiwa)
0 2012 18,221 1 2013 18,585 2 2014 18,957 3 2015 19,336 4 2016 19,723 5 2017 20,117 6 2018 20,520 7 2019 20,930 8 2020 21,349 9 2021 21,776
10 2022 22,211 11 2023 20,329 12 2024 20,532 13 2025 20,737 14 2026 20,945 15 2027 21,154 16 2028 21,366 17 2029 21,579 18 2030 21,795 19 2031 22,013 20 2032 22,233 21 2033 22,455 22 2034 22,680 23 2035 22,907 24 2036 23,136
2.962051312514.810
Lift-1 (GALIAN kedalaman 2 m)atas atas
pjg atau lbr ki (-) ka (-)135 135
85 85bawah 2 2 10,935 10,611
Sampah Total (m3/hari)
tinggi 2 11,475 11,47522,080
Lift-2 ( diatas galian tinggi = 1 m)pjg atau lbr
135 2 2 11,47585 10,611
11,040Lift-3 ( diatas galian tinggi = 1 m)
131 2 2 10,611 81 9,779
10,192Lift-4 ( diatas galian tinggi = 1 m)
127 2 2 9,779 77 8,979
9,376Lift-5 ( diatas galian tinggi = 1 m)
123 2 2 8,979 73 8,211
8,592
Lift-6 ( diatas galian tinggi = 1 m)119 2 2 8,211
69 7,475 7,840
Lift-7 ( diatas galian tinggi = 1 m)115 2 2 7,475
65 6,771 7,120
Lift-8 ( diatas galian tinggi = 1 m)111 2 2 7,475
61 6,099 6,775
83,017
Cek kasar
TOTAL 4 zona - 332,066
USIA LAYAN 3 12PENIMBUNAN Sampah yang diurug setel 14
0 14
#VALUE! 0#VALUE! 0#VALUE! 0#VALUE! #REF!#VALUE! #REF!#VALUE! #REF!#VALUE! #REF!
KESIMPULAN USIA LAYAN SATU ZONA = 3 126.57 #REF!137 #REF!
KESIMPULAN USIA LAYAN LANDFILLTOTAL JUMLAH ZONA 4
11.848 5% 0.000 0 0.000 0.00012.085 7.5% 0.000 0 0.000 0.00012.327 10.0% 10.848 51 5.532 2019.29012.573 12.5% 11.065 61 6.749 2463.53312.825 15.0% 11.286 70 7.900 2883.54613.081 17.5% 11.512 70 8.058 2941.21713.343 20.0% 11.742 70 8.219 3000.04113.610 22.5% 11.977 70 8.384 3060.04213.882 25.0% 12.216 70 8.551 3121.24314.160 27.5% 12.461 70 8.722 3183.66712.959 30.0% 11.404 70 7.983 2913.80913.089 30.0% 11.518 70 8.063 2942.94713.220 30.0% 11.634 70 8.143 2972.37713.352 30.0% 11.750 70 8.225 3002.10013.486 30.0% 11.867 70 8.307 3032.12113.621 30.0% 11.986 70 8.390 3062.44313.757 30.0% 12.106 70 8.474 3093.06713.894 30.0% 12.227 70 8.559 3123.99814.033 30.0% 12.349 70 8.644 3155.23814.174 30.0% 12.473 70 8.731 3186.79014.315 30.0% 12.597 70 8.818 3218.65814.458 30.0% 12.723 70 8.906 3250.84514.603 30.0% 12.851 70 8.995 3283.35314.749 30.0% 12.979 70 9.085 3316.186
535786.000
Lift-3 (GALIAN kebawah H= 1 m)atas atas
pjg atau lbr ki (-) ka (-)126
76luas area alas bawah 1.5 1.5
Sampah Total (ton/hari)
Reduksi di sumber (%)
Sampah yang akan
diangkut (ton/hari)
Tingkat pelayanan (%)
Sampah yang diangkut (ton/hari)
Sampah yang diangkut (ton/tahun)
luas area atas tinggi 1M3
Lift-2 (GALIAN kebawah H= 1 m)atas atas
luas alas pjg atau lbr ki (-) ka (-)luas area atas 129m3 79
bawah 1.5 1.5luas alas tinggi 1luas area atasm3 Lift-1 (GALIAN kebawah H= 1 m)
atas atasluas alas pjg atau lbr ki (-) ka (-)luas area atas 132m3 82
bawah 1.5 1.5luas alas tinggi 1luas area atasm3 Lift-1 ( diatas galian tinggi = 1 m)
pjg atau lbr135 1.5 1.5
luas alas 85
luas area atasm3 Lift-2 ( diatas galian tinggi = 1 m)
132 1.5 1.582
luas alasluas area atas Lift-3 ( diatas galian tinggi = 1 m)m3 129 1.5 1.5
79luas alasluas area atas Lift-4 ( diatas galian tinggi = 1 m)m3 126 1.5 1.5
76
m3Lift-5 ( diatas galian tinggi = 1 m)
120 1.5 1.570
tahun Lift-6 ( diatas galian tinggi = 1 m)m3 (tahun ke-3) 117 1.5 1.5m3 (tahun ke-4) 67
m3/tahunm3/bulan Lift-7 ( diatas galian tinggi = 1 m)m3/hari 114 1.5 1.5m3 --> masih ada selisih ! 64tahunbulan Lift-8 ( diatas galian tinggi = 1 m)hari 111 1.5 1.5
61tahunbulan Lift-9 ( diatas galian tinggi = 1 m)hari 108 1.5 1.5
58ZONA
Lift-10 ( diatas galian tinggi = 1 m)104 1.5 1.5
54
Lift-11 ( diatas galian tinggi = 1 m)101 1.5 1.5
51
Lift-12 ( diatas galian tinggi = 1 m)98 1.5 1.548
Volume total78 untuk satu zona
dengan luas135 x 85Satu TPAdengan 4 zona
USIA LAYAN PENIMBUNAN
0.00 0.000 0 00.00 0.000 0 09.22 3365.483 2 673
11.25 4105.889 2 82113.17 4805.909 3 96113.43 4902.028 3 98013.70 5000.068 3 100013.97 5100.070 3 102014.25 5202.071 3 104014.54 5306.112 3 106113.31 4856.348 3 97113.44 4904.912 3 98113.57 4953.961 3 99113.71 5003.501 3 100113.85 5053.536 3 101113.98 5104.071 3 102114.12 5155.112 3 103114.26 5206.663 3 104114.41 5258.729 3 105214.55 5311.317 3 106214.70 5364.430 3 107314.84 5418.074 3 108414.99 5472.255 3 109415.14 5526.977 3 1105
9,576 luas area alas
Sampah yang diurug setelah kompaksi
(m3/hari)
Sampah yang diurug setelah kompaksi
(m3/tahun)Tanah Penutup (m3/hari) Tanah Penutup
(m3/tahun)
10,191 luas area atas9,882 M3
10,191 luas area alas10,824 luas area atas10,506 M3
10,824 luas area alas11,475 luas area atas11,148 M3
11,475 luas alas 10,824 luas area atas
11,148 m3
10,824 luas alas 10,191 luas area atas
10,506 m3
10,191 luas alas 9,576 luas area atas
9,882 m3
9,576 luas alas 8,979 luas area atas
9,276 m3
8,979 luas alas 7,839 luas area atas
8,403 m3
7,839 luas alas 7,296 luas area atas
7,566 m3
7,296 luas alas 6,771 luas area atas
7,032 m3
7,296 luas alas 6,264 luas area atas
6,773 m3
7,296 luas alas 5,775 luas area atas
6,521 m3
7,296 luas alas 5,151 luas area atas
6,192 m3
7,296 luas alas 4,704 luas area atas
5,953 m3
7,296 luas alas 4,275 luas area atas
5,719 m3
126,506 m3 253,011.33
506,022.67 m3
1 tahun dimulai dari tahun 2015 khusus untuk Kawasan Gresik8,966 m3 (tahun ke-2016)
14,733 m3 (tahun ke-2017)5,767 m3/tahun 497,057.02
481 m3/bulan16 m3/hari
497,057 m3 --> masih ada selisih !86.19 tahun
1034.26 bulan31028
0 - 20,615 0 -
11 4,039 4,039 13 4,927 8,966 41,307 16 5,767 14,733 6,884.43 16 5,882 20,615 16 6,000 26,615 146,000.00 17 6,120 32,735 17 6,242 38,978 17 6,367 45,345 16 5,828 51,173 16 5,886 57,059 16 5,945 63,003 16 6,004 69,008 17 6,064 75,072 17 6,125 81,197 17 6,186 87,383 17 6,248 93,631 17 6,310 99,941 17 6,374 106,315 18 6,437 112,752 18 6,502 119,254 18 6,567 125,821 18 6,632 132,453
Total yang ditimbun (m3/hari)
Total yang ditimbun (m3/tahun)
Total yang
diakumulasikan(m3
/tahun)
No Nama Lift
1 Lift 1
2 Lift 2
3 Lift 34 Lift 45 Lift 56 Lift 6
7 Lift 78 Lift 89 Lift 9
10 Lift 1011 Lift 1112 Lift 12
No Nama Lift
Di Atas galian1 Lift 1
2 Lift 2
3 Lift 34 Lift 45 Lift 5
6 Lift 6
7 Lift 78 Lift 89 Lift 9
10 Lift 1011 Lift 1112 Lift 12
Di Bawah galian1 Lift 12 Lift 23 Lift 3
No Kecamatan
No Kecamatan
1 Gresik2 Kebomas3 Manyar4 Menganti5 Driyorejo6 Cerme7 Kedamean8 Balongpanggang9 Benjeng
10 WringinanomTotal
55.427.7
dimulai dari tahun 2015 khusus untuk Kawasan Gresik
24
32,735 5,455.89
Dimensi TPA Panjang TerasPanjang Lebar Tinggi Kiri Kanan
135 82 1 1.5 1.5
132 82 1 1.5 1.5
129 79 1 1.5 1.5
126 76 1 1.5 1.5
120 70 1 1.5 1.5
117 67 1 1.5 1.5
114 64 1 1.5 1.5
111 61 1 1.5 1.5
108 58 1 1.5 1.5
104 54 1 1.5 1.5
101 51 1 1.5 1.5
98 48 1 1.5 1.5
Dimensi TPA (m) Luas Alas
Panjang Lebar Tinggi Kiri Kanan m2 m2
135 82 1 1.5 1.5 11,475 10,824
132 82 1 1.5 1.5 10,824 10,191
129 79 1 1.5 1.5 10,191 9,576 126 76 1 1.5 1.5 9,576 8,979 120 70 1 1.5 1.5 8,979 7,839
117 67 1 1.5 1.5 7,839 7,296
114 64 1 1.5 1.5 7,296 6,771 111 61 1 1.5 1.5 7,296 6,264 108 58 1 1.5 1.5 7,296 5,775 104 54 1 1.5 1.5 7,296 5,151 101 51 1 1.5 1.5 7,296 4,704 98 48 1 1.5 1.5 7,296 4,275
132 82 1 1.5 1.5 10,824 11,475129 79 1 1.5 1.5 10,191 10,824126 76 1 1.5 1.5 9,576 10,191
Jumlah Penduduk
Panjang Teras (m)
Luas Area Atas
Jumlah Penduduk
91,28397,639
104,494114,844
99,43674,95759,44857,55764,12968,340
832,127
Volume
m3
11,148
10,506
9,8829,2768,403
7,566
7,0326,7736,5216,1925,9535,719
11,14810,506
9,882
Tahun ke- Tahun Jumlah Penduduk (Jiwa) Sampah Total (ton/hari)
0 2012 832,127 1 2013 840,448 535.786 02 2014 848,853 541.144 03 2015 857,341 546.555 124 2016 865,915 552.021 125 2017 874,574 557.541 126 2018 883,320 563.116 127 2019 892,153 568.747 128 2020 901,074 574.435 129 2021 910,085 580.179 12
10 2022 919,186 585.981 1211 2023 928,378 591.841 1212 2024 937,662 597.759 1213 2025 947,038 603.737 1214 2026 956,509 609.774 1215 2027 966,074 615.872 1216 2028 975,734 622.031 1217 2029 985,492 628.251 1218 2030 995,347 634.533 1219 2031 1,005,300 640.879 1220 2032 1,015,353 647.288 1221 2033 1,025,507 653.760 1222 2034 1,035,762 660.298 1223 2035 1,046,119 666.901 1224 2036 1,056,580 673.570 12
133.9464430313669.732
Lift-1 (GALIAN kedalaman 2 m)atas atas
pjg atau lbr ki (-) ka (-)135 135
85 85bawah 2 2 10,935 10,611
Reduksi di sumber (%)
tinggi 2 11,475 11,47522,080
Lift-2 ( diatas galian tinggi = 1 m)pjg atau lbr
135 2 2 11,47585 10,611
11,040Lift-3 ( diatas galian tinggi = 1 m)
131 2 2 10,611 81 9,779
10,192Lift-4 ( diatas galian tinggi = 1 m)
127 2 2 9,779 77 8,979
9,376Lift-5 ( diatas galian tinggi = 1 m)
123 2 2 8,979 73 8,211
8,592
Lift-6 ( diatas galian tinggi = 1 m)119 2 2 8,211
69 7,475 7,840
Lift-7 ( diatas galian tinggi = 1 m)115 2 2 7,475
65 6,771 7,120
Lift-8 ( diatas galian tinggi = 1 m)111 2 2 7,475
61 6,099 6,775
83,017
Cek kasar
TOTAL 4 zona - 332,066
USIA LAYAN 3 12PENIMBUNAN Sampah yang diurug setel 590
0 596
#VALUE! 6#VALUE! 0#VALUE! 0#VALUE! #REF!#VALUE! #REF!#VALUE! #REF!#VALUE! #REF!
KESIMPULAN USIA LAYAN SATU ZONA = 3 126.57 #REF!137 #REF!
KESIMPULAN USIA LAYAN LANDFILLTOTAL JUMLAH ZONA 4
0.000 0 0.000 0.000 0.00 0.0000.000 0 0.000 0.000 0.00 0.000
480.968 51 245.294 89532.278 408.82 149220.464485.778 61 296.325 108158.503 493.87 180264.172490.636 70 343.445 125357.479 572.41 208929.131495.542 70 346.880 126611.053 578.13 211018.422500.498 70 350.348 127877.164 583.91 213128.607505.503 70 353.852 129155.936 589.75 215259.893510.558 70 357.390 130447.495 595.65 217412.492515.663 70 360.964 131751.970 601.61 219586.617520.820 70 364.574 133069.490 607.62 221782.483526.028 70 368.220 134400.184 613.70 224000.307531.288 70 371.902 135744.186 619.84 226240.311536.601 70 375.621 137101.628 626.03 228502.714541.967 70 379.377 138472.644 632.30 230787.741547.387 70 383.171 139857.371 638.62 233095.618552.861 70 387.003 141255.945 645.00 235426.574558.389 70 390.873 142668.504 651.45 237780.840563.973 70 394.781 144095.189 657.97 240158.649569.613 70 398.729 145536.141 664.55 242560.235575.309 70 402.716 146991.502 671.19 244985.837581.062 70 406.744 148461.417 677.91 247435.696586.873 70 410.811 149946.032 684.69 249910.053592.742 70 414.919 151445.492 691.53 252409.153
535786.000
Lift-3 (GALIAN kebawah H= 1 m)atas atas
pjg atau lbr ki (-) ka (-)126
76luas area alas bawah 1.5 1.5
Sampah yang akan diangkut
(ton/hari)Tingkat
pelayanan (%)Sampah yang
diangkut (ton/hari)
Sampah yang diangkut
(ton/tahun)
Sampah yang diurug setelah
kompaksi (m3/hari)
Sampah yang diurug setelah kompaksi
(m3/tahun)
luas area atas tinggi 1M3
Lift-2 (GALIAN kebawah H= 1 m)atas atas
luas alas pjg atau lbr ki (-) ka (-)luas area atas 129m3 79
bawah 1.5 1.5luas alas tinggi 1luas area atasm3 Lift-1 (GALIAN kebawah H= 1 m)
atas atasluas alas pjg atau lbr ki (-) ka (-)luas area atas 132m3 82
bawah 1.5 1.5luas alas tinggi 1luas area atasm3 Lift-1 ( diatas galian tinggi = 1 m)
pjg atau lbr135 1.5 1.5
luas alas 85
luas area atasm3 Lift-2 ( diatas galian tinggi = 1 m)
132 1.5 1.582
luas alasluas area atas Lift-3 ( diatas galian tinggi = 1 m)m3 129 1.5 1.5
79luas alasluas area atas Lift-4 ( diatas galian tinggi = 1 m)m3 126 1.5 1.5
76
m3Lift-5 ( diatas galian tinggi = 1 m)
120 1.5 1.570
tahun Lift-6 ( diatas galian tinggi = 1 m)m3 (tahun ke-3) 117 1.5 1.5m3 (tahun ke-4) 67
m3/tahunm3/bulan Lift-7 ( diatas galian tinggi = 1 m)m3/hari 114 1.5 1.5m3 --> masih ada selisih ! 64tahunbulan Lift-8 ( diatas galian tinggi = 1 m)hari 111 1.5 1.5
61tahunbulan Lift-9 ( diatas galian tinggi = 1 m)hari 108 1.5 1.5
58ZONA
Lift-10 ( diatas galian tinggi = 1 m)104 1.5 1.5
54
Lift-11 ( diatas galian tinggi = 1 m)101 1.5 1.5
51
Lift-12 ( diatas galian tinggi = 1 m)98 1.5 1.548
Volume total78 untuk satu zona
dengan luas135 x 85Satu TPAdengan 4 zona
USIA LAYAN PENIMBUNAN
0 0 0 - 0 0 0 -
82 29844 491 179,065 99 36053 593 216,317
114 41786 687 250,715 116 42204 694 253,222 117 42626 701 255,754 118 43052 708 258,312 119 43482 715 260,895 120 43917 722 263,504 122 44356 729 266,139 123 44800 736 268,800 124 45248 744 271,488 125 45701 751 274,203 126 46158 759 276,945 128 46619 766 279,715 129 47085 774 282,512 130 47556 782 285,337 132 48032 790 288,190 133 48512 797 291,072 134 48997 805 293,983 136 49487 813 296,923 137 49982 822 299,892 138 50482 830 302,891
9,576 luas area alas
Tanah Penutup (m3/hari)
Tanah Penutup (m3/tahun) Total yang ditimbun (m3/hari) Total yang ditimbun
(m3/tahun)
10,191 luas area atas9,882 M3
10,191 luas area alas10,824 luas area atas10,506 M3
10,824 luas area alas11,475 luas area atas11,148 M3
11,475 luas alas 10,824 luas area atas
11,148 m3
10,824 luas alas 10,191 luas area atas
10,506 m3
10,191 luas alas 9,576 luas area atas
9,882 m3
9,576 luas alas 8,979 luas area atas
9,276 m3
8,979 luas alas 7,839 luas area atas
8,403 m3
7,839 luas alas 7,296 luas area atas
7,566 m3
7,296 luas alas 6,771 luas area atas
7,032 m3
7,296 luas alas 6,264 luas area atas
6,773 m3
7,296 luas alas 5,775 luas area atas
6,521 m3
7,296 luas alas 5,151 luas area atas
6,192 m3
7,296 luas alas 4,704 luas area atas
5,953 m3
7,296 luas alas 4,275 luas area atas
5,719 m3
126,506 m3 253,011.33
506,022.67 m3
1 tahun dimulai dari tahun 2015 khusus untuk Kawasan Gresik395,382 m3 (tahun ke-2016)646,097 m3 (tahun ke-2017)250,715 m3/tahun 110,641.10
20,893 m3/bulan687 m3/hari
110,641 m3 --> masih ada selisih !0.44 tahun5.30 bulan159
FS 899,319 DED
Kons 179,065 1,413,385 1 395,382 1,758,719 235,564.14 2 646,097 293,119.87 3 899,319 4 1,155,073 146,000.00 5 1,413,385 6 1,674,280 7 1,937,784 8 2,203,923 9 2,472,723 10 2,744,211 11 3,018,415 12 3,295,360 13 3,575,075 14 3,857,587 15 4,142,924 16 4,431,114 17 4,722,186 18 5,016,169 19 5,313,092 20 5,612,984 21 5,915,875 22
Total yang diakumulasikan
(m3/tahun)Tahun
Operasi
No Nama LiftDimensi TPA
Panjang1 Lift 1 1352 Lift 2 132
3 Lift 3 1294 Lift 4 1265 Lift 5 1206 Lift 6 1177 Lift 7 1148 Lift 8 1119 Lift 9 108
10 Lift 10 10411 Lift 11 10112 Lift 12 98
No Nama Lift
PanjangDi Bawah galian
3 Lift 3 1262 Lift 2 1291 Lift 1 132
Di Atas galian1 Lift 1 135
2 Lift 2 132
3 Lift 3 1294 Lift 4 1265 Lift 5 1206 Lift 6 1177 Lift 7 1148 Lift 8 1119 Lift 9 108
10 Lift 10 10411 Lift 11 101
12 Lift 12 98
No Kecamatan
Dimensi TPA (m)
Jumlah Penduduk
No Kecamatan
1 Gresik 91,2832 Kebomas 97,6393 Manyar 104,4944 Menganti 114,8445 Driyorejo 99,4366 Cerme 74,9577 Kedamean 59,4488 Balongpanggang 57,5579 Benjeng 64,129
10 Wringinanom 68,340Total 832,127
55.427.7
dimulai dari tahun 2015 khusus untuk Kawasan Gresik
24
Jumlah Penduduk
Tahun
2012201320142015 245.29 50% 122.65 179064.56 1.422016 296.32 50% 148.16 395381.56 3.132017 343.45 50% 171.72 646096.52 5.112018 346.88 50% 173.44 899318.63 7.112019 350.35 50% 175.17 1155072.96 9.132020 353.85 50% 176.93 1413384.83 11.172021 357.39 50% 178.70 1674279.82 13.232022 360.96 50% 180.48 1937783.76 15.322023 364.57 50% 182.29 2203922.74 17.422024 368.22 50% 184.11 2472723.11 19.552025 371.90 50% 185.95 2744211.48 21.692026 375.62 50% 187.81 3018414.73 23.862027 379.38 50% 189.69 3295360.02 26.052028 383.17 50% 191.59 3575074.77 28.262029 387.00 50% 193.50 3857586.65 30.492030 390.87 50% 195.44 4142923.66 32.752031 394.78 50% 197.39 4431114.04 35.032032 398.73 50% 199.36 4722186.32 37.332033 402.72 50% 201.36 5016169.33 39.652034 406.74 50% 203.37 5313092.16 42.002035 410.81 50% 205.41 5612984.23 44.372036 414.92 50% 207.46 5915875.21 46.76
Sampah yang diangkut (ton/hari)
Asumsi kadar air sampah
Debit Lindi dari Sampah (m3/hari)
Total yang diakumulasikan
(m3/tahun)
Zona TPA (11,475
m2/zona)
Dimensi TPA Panjang Teras
Lebar Tinggi Kiri Kanan
82 1 1.5 1.5
82 1 1.5 1.5
79 1 1.5 1.5
76 1 1.5 1.5
70 1 1.5 1.5
67 1 1.5 1.5
64 1 1.5 1.5
61 1 1.5 1.5
58 1 1.5 1.5
54 1 1.5 1.5
51 1 1.5 1.5
48 1 1.5 1.5
Panjang Teras (m) Luas Alas Luas Area Atas
Lebar Tinggi Kiri Kanan m2 m2
76 1 1.5 1.5 9,576 10,19179 1 1.5 1.5 10,191 10,82482 1 1.5 1.5 10,824 11,475
82 1 1.5 1.5 11,475 10,824
82 1 1.5 1.5 10,824 10,191
79 1 1.5 1.5 10,191 9,576 76 1 1.5 1.5 9,576 8,979 70 1 1.5 1.5 8,979 7,839 67 1 1.5 1.5 7,839 7,296 64 1 1.5 1.5 7,296 6,771 61 1 1.5 1.5 7,296 6,264 58 1 1.5 1.5 7,296 5,775 54 1 1.5 1.5 7,296 5,151 51 1 1.5 1.5 7,296 4,704
48 1 1.5 1.5 7,296 4,275
Zona TPA Luas Total (Ha)
2.00 2.30 235.00 539.32 661.97 661.974.00 4.59 235.00 1078.65 1226.81 1226.816.00 6.89 235.00 1617.98 1789.70 1789.708.00 9.18 235.00 2157.30 2330.74 2330.74
10.00 11.48 235.00 2696.63 2871.80 2871.8012.00 13.77 235.00 3235.95 3412.88 3412.8814.00 16.07 235.00 3775.28 3953.97 3953.9716.00 18.36 235.00 4314.60 4495.08 4495.0818.00 20.66 235.00 4853.93 5036.21 5036.2120.00 22.95 235.00 5393.25 5577.36 5577.3622.00 25.25 235.00 5932.58 6118.53 6118.5324.00 27.54 235.00 6471.90 6659.71 6659.7127.00 30.98 235.00 7280.89 7470.58 7470.5829.00 33.28 235.00 7820.21 8011.80 8011.8031.00 35.57 235.00 8359.54 8553.04 8553.0433.00 37.87 235.00 8898.86 9094.30 9094.3036.00 41.31 235.00 9707.85 9905.24 9905.2438.00 43.61 235.00 10247.18 10446.54 10446.5440.00 45.90 235.00 10786.50 10987.86 10987.8642.00 48.20 235.00 11325.83 11529.20 11529.2045.00 51.64 235.00 12134.81 12340.22 12340.2247.00 53.93 235.00 12674.14 12881.60 12881.60
Debit Infiltrasi Air Hujan
(m3/Ha.hari)
Debit Lindi Infiltrasi Air
Hujan (m3/hari)
Debit Lindi Total
(m3/hari)
Kebutuhan Lahan Kolam Lindi/IPAL
(m2)
Volume
m3
9,882 9,88210,506 20,38811,148 31,536
11,148 42,68410,506 53,190
9,882 63,0719,276 72,3478,403 80,7507,566 88,3167,032 95,3486,773 102,1216,521 108,6426,192 114,8345,953 120,7875,719 126,506
2.9%2.7%2.6%2.5%2.5%2.5%2.5%2.4%2.4%2.4%2.4%2.4%2.4%2.4%2.4%2.4%2.4%2.4%2.4%2.4%2.4%2.4%
Kebutuhan Lahan IPAL Lindi
terhadap luas landfill