Timetable Akreditasi Percepatan
-
Upload
febriyanti-eka-lukmana -
Category
Documents
-
view
52 -
download
4
description
Transcript of Timetable Akreditasi Percepatan
Sheet1
NOKEGIATANTIME SCHEDULEJANFEBMARAPRMAY123412341234123412341RAPAT PANITIA AKREDITASI2WORKSHOP KARS3self assesment4BIMBINGAN KARS5SURVEY SIMULASI6RAPAT KOORDINASI TIAP POKJA7PENILAIAN AKREDITASI
Sheet2ANGGARAN KEGIATANPERSIAPAN AKREDITASI RS. AN-NISA TAHUN 2015
NOKEGIATANVOL.BIAYATOTALKET
BIAYA WABS1Workshop KARS110,000,00010,000,0005 orang2Bimbingan KARS149,000,00049,000,0008 hari3Survey Simulasi149,000,00049,000,0003 hari
KONSUMSI4Konsumsi terkait Bimbingan 12050,0006,000,0008 hari5Konsumsi terkait Survey Simulasi9050,0004,500,0003 hari6Konsumsi terkait Survey Penilaian9050,0004,500,0003 hari
TRANSPORT SURVEYOR7Transport terkait Bimbingan41,000,0004,000,0008Transport terkait Survey Simulasi32,000,0006,000,0009Transport terkait Survey Penilaian35,000,00015,000,000
AKOMODASI SURVEYOR10Akomodasi terkait Bimbingan41,000,0004,000,0004 orang - 1 malam11Akomodasi terkait Survey Simulasi61,000,0006,000,0003 orang - 2 malam12Akomodasi terkait Survey Penilaian61,000,0006,000,0003 orang - 2 malam
LAIN-LAIN13ATK115,000,00015,000,00014Konsumsi Rapat Besar27050,00013,500,00010 rapat @ 27 orang15Konsumsi Rapat Pokja100020,00020,000,00040 rapat @25 orang16Dokumentasi12,500,0002,500,00017Biaya tak terduga115,000,00015,000,000
18succes fee100,000,00019biaya pendaftaran akreditasi31,000,000BIAYA TOTAL361,000,000
Sheet3