PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV LAPORAN PERSEDIAAN P D P + A SEPTEMBER 2011

Transcript of September 11

Page 1: September 11

PJJB/FML/8-68

05/01/2011 - 009 PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL P D P + A T T B

SEPTEMBER 2011

Page 2: September 11

PJJB/FML/8-69 REKAPITULASI NILAI PDP 2/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

REKAPITULASI NILAI MATERIAL PDP UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

BULAN : SEPTEMBER 2011

No/NOMOR KONTRAK

MATERIAL GARDU INDUK MATERIAL TRANSMISI JUMLAH

Hal PENCADANGAN SISA BEBAS PENCADANGAN SISA BEBAS T O T A L1 2 3 4 5 6 71 PJP.021/PST/88 - 18,288,069 - - 18,288,069

084.PJ/9220/1990/M - 16,500,000 - - 16,500,000096.PJ/063/PIKITRING JJ/97 - 62,964,000 - - 62,964,000PJ.031/PST/88 - 7,758,400 - - 7,758,400105.PJ/9220/1997/M - 0 - - 0PJ.020/PST/88 - 6,751,949 - - 6,751,949PJP.021/PST/88 GI. KRACAK - 21,607,602 - - 21,607,602

2 PJP.021/PST/88 GI. CILEGON - 59,465,325 - - 59,465,325SPK.0379/9220/1991/M - 2,276,997 - - 2,276,997SPK.382/9220/1991/M - 5,153,808 - - 5,153,808SPK.012/9220/1991/M - 22,553,944 - - 22,553,944SPK.02/921/1992/M - 2,122,464 - - 2,122,464

3 SPK.011.PJ/9220/1991/M - 1,053,580 - - 1,053,580079.PJ/922/1992/M - 528,560,747 - - 528,560,747100.B.PJ/9220/1994/M - 212,800,000 - - 212,800,000118.C.PJ/9220/1994/M - 386,787,500 - - 386,787,500SPK.094.PJ/9220/1992/M - 1,162,634 - - 1,162,634

4 PJP.003/PST/88 - 0 - - 0PJ.01/9220/Pring Jb/1993/M - 2,985,600 - - 2,985,600129.PJ/Pring Jb/1993/M (GI) - 14,583,670 - - 14,583,670208.PJ/9220/1995/M - 99,635,619 - - 99,635,619064.PJ/9220/1997/M - 168,839,735 - - 168,839,735059.PJ/131/PIKIT JBN/04 - 0 - - 0059.PJ/131/PI KITRING JBN/04 - 887,880,000 - - 887,880,000

5 077.PJ/131/PI KITRING JBN/04 - 349,206,000 - - 349,206,000113.PJ/133/PIKIT JBN/06 - 82,468,111 - - 82,468,111EX DKI - 0 - - 0018.PJ/133/PIKIT JBN/07 - 387,595,710 - - 387,595,710

6 Material Ex PLN Jawa Tengah - - - 28,153,400 28,153,40053.P/9220/1993/M - - - 24,653,589 24,653,589110.C.PJ/9220/1994/M - - 70,270,652 0 70,270,652063.PJ/9220/1995/M - - - 162,310,390 162,310,390053.PJ/9220/1995/M - - - 5,940,000 5,940,000051.PJ/9220/1995/M - - - 5,692,500 5,692,500206.PJP/9220/1995/M - - - 99,802,032 99,802,032

7 060.PJ/9220/1995/M - - 369,680,740 406,403,462 776,084,202129.PJ/Pring Jb/1993/M (TR) - - - 217,590,739 217,590,739078.PJ/131/PI KITRING JBN/03 - - 2,556,345,000 5,745,630,000 8,301,975,000074.PJ/131/PI KITRING JBN/04 - - 6,771,600,000 - 6,771,600,000

8 075.PJ/131/PI KITRING JBN/04 - - 8,621,160,000 84,618,600 8,705,778,600008.PJ/063/PIKITRING JJ/01 - - - 2,867,940,702 2,867,940,702

9 008.PJ/063/PIKITRING JJ/01 - - - 2,126,091,204 2,126,091,204021.PJ/131/PIKIT JBN/07 - - 286,996,970 - 286,996,970

10 093.AM-2/131 PIKIT JBN/08 - 0 - - 0159.PJ/131/PIKIT JBN/07 - - 8,446,620,000 - 8,446,620,000029.P/041/PROKIT JBR/08 - - 618,534,400 - 618,534,400

11 228.AM-6/131/PIKIT JBN/09 - - 3,060,738,259 - 3,060,738,259

12 227.AM-6/131/PIKIT JBN/09 - - 3,206,805,168 - 3,206,805,168

13 230.AM-6/131/PIKIT JBN/09 - - 3,840,303,882 - 3,840,303,882

14 210.AM-5/131/PIKIT JBN/09 - - 963,196,614 - 963,196,614 225.AM-7/131/PIKIT JBN/09 - - 0 - 0 229.AM-6/131/PIKIT JBN/09 - - 7,873,580,705 - 7,873,580,705

SUB TOTAL 0 3,349,001,464 46,685,832,390 11,774,826,618 61,809,660,472

Page 3: September 11

PJJB/FML/8-69 REKAPITULASI NILAI PDP 3/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

REKAPITULASI NILAI MATERIAL PDP UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

BULAN : SEPTEMBER 2011

No/

NOMOR KONTRAK MATERIAL GARDU INDUK MATERIAL TRANSMISI JUMLAHHal PENCADANGAN SISA BEBAS PENCADANGAN SISA BEBAS T O T A L1 2 3 4 5 6 7

SUB TOTAL 0 3,349,001,464 46,685,832,390 11,774,826,618 61,809,660,472

15 192.AM-5/131/PIKIT JBN/09 - - 30,392,272,343 - 30,392,272,34316 251.AM-7/131/PIKIT JBN/09 - - 436,074,760 - 436,074,76017 192.AM-5/131/PIKIT JBN/09 - - 6,595,263,495 - 6,595,263,495

192.AM-5/131/PIKIT JBN/09 - - 73,635,618 - 73,635,618

18 210.AM-5/131/PIKIT JBN/09 - - 8,471,000 - 8,471,000 056.PJ/131/PIKIT JBN/10 - - 2,973,912,000 - 2,973,912,000 230.AM-6/131/PIKIT JBN/09 - - 74,052,633 - 74,052,633 228.AM-6/131/PIKIT JBN/09 - - 465,300 - 465,300 210.AM-5/131/PIKIT JBN/09 - - 77,968,000 - 77,968,000- - -

19 229.AM-6/131/PIKIT JBN/09 - - 5,775,984,384 - 5,775,984,38420 112.AM-1/131/PIKIT JBN/10 - - 4,114,967,748 - 4,114,967,748

SUB JUMLAH 0 3,349,001,464 97,208,899,671 11,774,826,618 112,332,727,753

JUMLAH TOTAL PENCADANGAN = 97,208,899,671 SISA BEBAS = 15,123,828,082(GI + TRANSMISI) (GI + TRANSMISI)

JUMLAH TOTAL GARDU INDUK = 3,349,001,464 TRANSMISI = 108,983,726,289 112,332,727,753(PENC + S. BEBAS) (PENC + S. BEBAS)

= Material Mutasi = Material Masuk = Material Habis

Bandung, 30 September 2011

MANAGER UPKJJB REGION IV KOORDINATOR LOGISTIK

Ir. SYAIFOEL ARIEF YAYUS RUSYADI SASTRA

Page 4: September 11

PJJB/FML/8-70

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

REKAPITULASI NILAI MATERIAL PDPGARDU INDUK

GUDANG CIGERELENG BANDUNGAKHIR BULAN : SEPTEMBER 2011

NOMOR KONTRAK

NILAI PDP NILAI MATERIAL SISA BEBAS (Rp.) NILAI MATERIAL PENCADANGAN (Rp.)

KETERANGANNO/ TANGGAL AKHIR BULAN : JULI 2011 AKHIR BULAN : JULI 2011 AKHIR BULAN : JULI 2011HAL KONTRAK TRANSMISI GARDU INDUK TRANSMISI GARDU INDUK TRANSMISI GARDU INDUK

(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)1 2 3 4 5 6 7 8 9 10

1 PJ.P.021/PST/88. - 18,288,069 - 18,288,069 - - PT. MERLIN GERLIN084.PJ/9220/1990/M - 16,500,000 - 16,500,000 - - PT. TRISMETIC096.PJ/063/PIKIT JJ/97 - 62,964,000 - 62,964,000 - - PT. INTAN MUFAKAT RAYAPJ.031/PST/88 - 7,758,400 - 7,758,400 - - PT. SUCACO105.PJ/9220/1997/M. - - - - - - PT. SCHENEIDERPJ.020/PST/88 - 6,751,949 - 6,751,949 - - PT. MERLIN GERLINPJP.021/PST/88 (GI KRACAK) - 21,607,602 - 21,607,602 - - PT. MERLIN GERLIN

2 PJP.021/PST/88 (GI CILEGON) - 59,465,325 - 59,465,325 - - PT. MERLIN GERLINSPK.379/9220/1991/M. - 2,276,997 - 2,276,997 - - PT. MITRA KARYASPK.382/9220/1991/M - 5,153,808 - 5,153,808 - - PT. MITRA KARYASPK.012/9220/1991/M - 22,553,944 - 22,553,944 - - CV. LIBRA KENCANMASPK.02/921/1992/M. - 2,122,464 - 2,122,464 - - CV. MERCURI

3 SPK.011.PJ/9220/91/M. - 1,053,580 - 1,053,580 - - CV. MITRA KARYA079.PJP/922/1992/M. - 528,560,747 - 528,560,747 - - PT. MERLIN GERLIN100.B.PJ/9220/94/M. - 212,800,000 - 212,800,000 - - PT. HARPER INDAH118.C.PJ/9220/94/M. - 386,787,500 - 386,787,500 - - PT. MULTI PRIMASPK. 094.PJ/92/M. - 1,162,634 - 1,162,634 - - PT. KEMBAR ABADI

4 PJ.P.003/PST/88 - - - - - - PT. KABEL INDONESIAPJ.01/PRINGJB/93/M. - 2,985,600 - 2,985,600 - - PT. FADILAH129PJ/PRI.JB/93/M. - 14,583,670 - 14,583,670 - - PT. PROTINIKA208.PJ/9220/1995/M. - 99,635,619 - 99,635,619 - - PT. CIPTA MULYA BUMI064.PJ/97/M. - 168,839,735 - 168,839,735 - - PT. SCHENEIDER059.PJ/131/PIKIT JBN/04 12 JULI 2004 - 887,880,000 - 887,880,000 - - PT. ASIH SILAPURNA

5 077.PJ/131/PIKIT JBN/04 10-Sep-2004 - 349,206,000 - 349,206,000 - - PT. NAWABINA113.PJ/133/PIKIT JBN/06 16 DESEMBER 2005 - 82,468,111 - 82,468,111 - - PT. HILMANINDO018.PJ/133/PIKIT JBN/07 20 Februari 2007 387,595,710 387,595,710 - - PT. META EPSI

SUB JUMLAH GI 0 3,349,001,464 0 3,349,001,464 0 - JUMLAH GARDU INDUK 3,349,001,464

= Material Mutasi = Material Masuk/Retur

Bandung, 30 September 2011

KOORDINATOR LOGISTIK

Page 5: September 11

PJJB/FML/8-70

YAYUS RUSYADI SASTRA

Page 6: September 11

PJJB/FML/8-71 REKAPITULASI NILAI MATERIAL TRANSMISI 6/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

REKAPITULASI NILAI MATERIAL PDPTRANSMISI

GUDANG CIGERELENG BANDUNGAKHIR BULAN : SEPTEMBER 2011

NOMOR KONTRAK

NILAI PDP NILAI MATERIAL SISA BEBAS (Rp.) NILAI MATERIAL PENCADANGAN (Rp.)

KETERANGANNO/ TANGGAL AKHIR BULAN : JULI 2011 AKHIR BULAN : JULI 2011 AKHIR BULAN : JULI 2011HAL KONTRAK TRANSMISI GARDU INDUK TRANSMISI GARDU INDUK TRANSMISI GARDU INDUK

(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)1 2 3 4 5 6 7 8 9 10

6 EX PLN JATENG. 28,153,400 - 28,153,400 - - - EX PLN JATENG.53.P/9220/1993/M 24,653,589 - 24,653,589 - - - CHINA SHENYANG110.C.PJ/9220/94/M. 70,270,652 - - - 70,270,652 - PT. PEMB. PERUMAHAN063.PJ/9220/1995/M. 162,310,390 - 162,310,390 - - - PT. MULTIFAB053.PJ/9220/1995/M. 5,940,000 - 5,940,000 - - - 123.PJ/9220/1995/M. - - - - - - PT. SARIHARI051.PJ/9220/1995/M. 5,692,500 - 5,692,500 - - - PT. PERPECT CIRCLE206.PJ/9220/95/M 99,802,032 - 99,802,032 - - - PT. TWINK

7 060.PJ/9220/1995/M. 776,084,202 - 406,403,462 - 369,680,740 - PT. WIJAYA KARYA129PJ/PRI.JB/93/M. 217,590,739 - 217,590,739 - - PT. PROTINIKA078.PJ/131/PIKIT JBN/03 11 DESEMBER 2003 8,301,975,000 - 5,745,630,000 - 2,556,345,000 - PT. TWINK074.PJ/131/PIKIT JBN/04 30 AGUSTUS 2004 6,771,600,000 - - - 6,771,600,000 - PT. KEMBAR ABADI

8 075.PJ/131/PIKIT JBN/04 30 AGUSTUS 2004 8,705,778,600 - 84,618,600 - 8,621,160,000 - PT. ALHAS (ASESORIS)075.PJ/131/PIKIT JBN/04 30 AGUSTUS 2004 - - - - - - PT. ALHAS008.PJ/063/PIKIT JJ/01 8 JANUARI 2001 2,867,940,702 - 2,867,940,702 - - - SURFLUS BBS

9 008.PJ/063/PIKIT JJ/01 8 JANUARI 2001 2,126,091,204 - 2,126,091,204 - - - SURFLUS BBS021.PJ/131/PIKIT JBN/07 27 MARET 2007 286,996,970 - - - 286,996,970 - PT. KEMBAR ABADI

10 093.AM-2/131/PIKIT JBN/08 27 JUNI 2008 - - - - - - PT. WINA PERDANA159.PJ/131/PIKIT JBN/07 16 NOP 2007 8,446,620,000 - - - 8,446,620,000 - PT. MEGA ELTRA029.P/041/PROKIT JBR/08 17 OKTOBER 2008 618,534,400 - - - 618,534,400 - PT. BINA NOVITA

11 228.AM-6/131/PIKIT JBN/09 19 OKTOBER 2009 3,060,738,259 - - - 3,060,738,259 - PT. HASTA SURYA NUSANTARA

12 227.AM-6/131/PIKIT JBN/09 19 OKTOBER 2009 3,206,805,168 - - - 3,206,805,168 - PT. INTAN MUFAKAT RAYA

13 230.AM-6/131/PIKIT JBN/09 19 OKTOBER 2009 3,840,303,882 - - - 3,840,303,882 - BEVERINT MEKADAYA

SUB TOTAL 49,623,881,689 11,774,826,618 37,849,055,071

Page 7: September 11

PJJB/FML/8-71 REKAPITULASI NILAI MATERIAL TRANSMISI 7/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

REKAPITULASI NILAI MATERIAL PDPTRANSMISI

GUDANG CIGERELENG BANDUNGAKHIR BULAN : SEPTEMBER 2011

NOMOR KONTRAK

NILAI PDP NILAI MATERIAL SISA BEBAS (Rp.) NILAI MATERIAL PENCADANGAN (Rp.)

KETERANGANNO/ TANGGAL AKHIR BULAN : JULI 2011 AKHIR BULAN : JULI 2011 AKHIR BULAN : JULI 2011HAL KONTRAK TRANSMISI GARDU INDUK TRANSMISI GARDU INDUK TRANSMISI GARDU INDUK

(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)1 2 3 4 5 6 7 8 9 10

SUB TOTAL 49,623,881,689 11,774,826,618 37,849,055,071

14 210.AM-5/131/PIKIT JBN/09 15-Sep-2009 963,196,614 - - - 963,196,614 - PT. ALTASIA - PT. PRIMA ESTIKA 225.AM-7/131/PIKIT JBN/09 19 OKTOBER 2009 - - - - - - IBNU TARYU - EMSINDO 229.AM-6/131/PIKIT JBN/09 19 OKTOBER 2009 7,873,580,705 - - - 7,873,580,705 - KEMBAR ABADI - INTAN MUFAKAT

15 192.AM-5/131/PIKIT JBN/09 21 AGUSTUS 2009 30,392,272,343 - - - 30,392,272,343 - PT. MEGA ELTRA

16 251.AM-7/131/PIKIT JBN/09 436,074,760 - - - 436,074,760 - PT. TEHATE PUTRA TUNGGAL

17 192.AM-5/131/PIKIT JBN/09 6,595,263,495 - - - 6,595,263,495 - PT. MEGA ELTRA 192.AM-5/131/PIKIT JBN/09 21 AGUSTUS 2009 73,635,618 - - - 73,635,618 - PT. MEGA ELTRA

18 210.AM-5/131/PIKIT JBN/09 15-Sep-2009 8,471,000 - - - 8,471,000 - PT. ALTASIA - PT. PRIMA ESTIKA 056.PJ/131/PIKIT JBN/10 14 OKTOBER 2010 2,973,912,000 - - - 2,973,912,000 - BEVERINT SURYA SEJATI 230.AM-6/131/PIKIT JBN/09 19 OKTOBER 2009 74,052,633 - - - 74,052,633 - BEVERINT MEKADAYA 228.AM-6/131/PIKIT JBN/09 19 OKTOBER 2009 465,300 - - - 465,300 - PT. HASTA SURYA NUSANTARA 210.AM-5/131/PIKIT JBN/09 15-Sep-2009 77,968,000 - - - 77,968,000 - PT. ALTASIA - PT. PRIMA ESTIKA -

19 229.AM-6/131/PIKIT JBN/09 19 OKTOBER 2009 5,775,984,384 - - - 5,775,984,384 - KEMBAR ABADI - INTAN MUFAKAT20 112.AM-1/131/PIKIT JBN/10 22 OKTOBER 2010 4,114,967,748 - - - 4,114,967,748 - BEVERINT SURYA SEJATI

SUB JUMLAH TR 108,983,726,289 11,774,826,618 97,208,899,671

JUMLAH TRANSMISI 108,983,726,289 JUMLAH TOTAL 112,332,727,753 GARDU INDUK + TRANSMISI

= Material Mutasi = Material Masuk/Retur

Bandung, 30 September 2011

KOORDINATOR LOGISTIK

YAYUS RUSYADI SASTRA

Page 8: September 11

PJJB/FML/8-72

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

REKAPITULASI NILAI MATERIAL PDPGUDANG CIGERELENG BANDUNGAKHIR BULAN : SEPTEMBER 2011

NAMA MATERIALNILAI MATERIAL PDP NILAI PROGRAM PEMAKAIAN NILAI SISA BEBAS

KETERANGANNO AKHIR BULAN : SEPTEMBER 2011 AKHIR BULAN : SEPTEMBER 2011 AKHIR BULAN : SEPTEMBER 2011TRANSMISI (Rp.) GARDU INDUK (Rp.) TRANSMISI (Rp.) GARDU INDUK (Rp.) TRANSMISI (Rp.) GARDU INDUK (Rp.)

1 2 3 4 5 = 3 - 4 6

1 GARDU INDUK 3,349,001,464 0 3,349,001,464

2 TRANSMISI 108,983,726,289 97,208,899,671 11,774,826,618

JUMLAH 108,983,726,289 3,349,001,464 97,208,899,671 0 11,774,826,618 3,349,001,464

TOTAL 112,332,727,753 97,208,899,671 15,123,828,082

Page 9: September 11

PJJB/FML/8-73

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

DAFTAR PEMANFAATAN MATERIAL PDP OLEH UNIT SENDIRIUNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

No. No. KODENAMA BARANG / SPARE PART

ASAL MAT.Vol Sat

TANGGAL NO LOKASI RUPIAHKETUrt. KARTU BARANG NO. KONTRAK T U G 9 T U G 9 PENGGUNAAN GARDU INDUK TRANSMISI JUMLAH

SEPTEMBER 2011

1 785 202 BT 002 S 020 Six twin line conductor ACSR 429/57 mm2 (zebra) 192.AM-5/131/PIKIT JBN/09 70,000 Mtr 29 Sept 2011 03/GD/BP/IX/2011 Mandirancan - Cikijing 0 5,286,890,000 5,286,890,000 2 787 202 BT 002 O 007 One earth conductor, GSW 55 mm2 " 8,000 Mtr " " " 0 82,456,000 82,456,000 3 866 202 BT 002 S 027 Suspension Set double string (120 KN Normal Type / " 342 Sets " " " 0 2,078,131,878 2,078,131,878

Type A)

0 7,447,477,878 7,447,477,878

TOTAL BULAN SEPTEMBER 2011 7,447,477,878

Bandung, 30 September 2011

MANAGER UPKJJB REGION IV KOORDINATOR LOGISTIK

Ir. SYAIFOEL ARIEF YAYUS RUSYADI SASTRA

Page 10: September 11

PJJB/FML/8-73

- - -

- - - -

35000 6936 242,760,000 ### - -

- - - 832 14 6,545,000 91,630,000 86 Compressio202 BT 002 C 001 Set 1,624 86 1,624 139,664

418 Galvanised 202 BG 002 G 001Set ### 1 3,202,811 3,202,811 3,342,475

833 18 7,645,000 137,610,000 -

834 6 10,065,000 60,390,000 -

835 15 550,000 8,250,000 836 44 660,000 29,040,000 837 15 1,369,500 20,542,500 838 16 2,029,500 32,472,000 852 6,800 21,780 148,104,000

###

Page 11: September 11

PJJB/FML/8-74

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

DAFTAR PEMANFAATAN MATERIAL PDP OLEH UNIT LAINUNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

No. No. KODENAMA BARANG / SPARE PART

ASAL MAT.Sat Vol

TANGGAL NO LOKASI RUPIAH KETERANGANUrt. KARTU BARANG NO. KONTRAK T U G 8 T U G 8 PENGGUNAAN GARDU INDUK TRANSMISI JUMLAH

SEPTEMBER 2011

N I H I L 0 0 0 3

0 0 0

TOTAL BULAN SEPTEMBER 2011 0

Bandung, 30 September 2011

MANAGER UPKJJB REGION IV KOORDINATOR LOGISTIK

Ir. SYAIFOEL ARIEF YAYUS RUSYADI SASTRA

Page 12: September 11

PJJB/FML/8-74

MAYARUDIN

Page 13: September 11

PJJB/FML/8-74

58,981,956 176,945,868

Page 14: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPGARDU INDUK

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 1 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 251 Single Phase Current Transformer Post Housing 202 BG 002 S 018 Set 6,096,023 3 0 0 3 18,288,069 0 0 3 18,288,069 PJ.P.021/PST/88. GI. SUMEDANGThe follow CT'S : one 200/100/5A 25VA

SUB JUMLAH 18,288,069 0 18,288,069 G1

JUMLAH = 18,288,069 1 283 Busbar Conductor & Connection Eq. 400 M 202 BG 002 B 009 Set 5,500,000 3 0 0 3 16,500,000 0 0 3 16,500,000 084.PJ/9220/1990/M

SUB JUMLAH 16,500,000 0 16,500,000 G2

JUMLAH = 16,500,000 1 412 Busbar Conductor TAL 980 mm2 202 BG 002 B 010 Mtr 39,600 1,590 0 0 1,590 62,964,000 0 0 1,590 62,964,000 096.PJ/063/PIKIT JJ/97

SUB JUMLAH 62,964,000 0 62,964,000 G3

JUMLAH = 62,964,000 1 204 Kabel NA2XSY 20 KV ukuran 1x150 mm2 203 BG 003 K 017 Mtr 5,968 1,300 0 0 1,300 7,758,400 0 0 1,300 7,758,400 PJ.031/PST/88

SUB JUMLAH 7,758,400 0 7,758,400 G4

JUMLAH = 7,758,400 1 408 Control, Power cable&Necessary Equip. to complete scope Lot

* Kabel NYFGBY 2 x 10 mm 202 BG 002 K 007 Mtr 11,184 0 0 0 0 - 0 0 0 0 105.PJ/9220/1997/M. TUG 9 : 01/GD/BP/I/09

SUB JUMLAH - 0 0 G5

JUMLAH = 0 1 206 Out Door Termination for 150 sqmm 204 BG 004 O 001 Bh 136,393 43 0 0 43 5,864,899 0 0 43 5,864,899 PJ.020/PST/882 207 In Door Termination for 150 sqmm 204 BG 004 I 001 Bh 67,500 12 0 0 12 810,000 0 0 12 810,000 PJ.020/PST/883 208 In Door Termination for 240 sqmm 204 BG 004 I 002 Bh 77,050 1 0 0 1 77,050 0 0 1 77,050 PJ.020/PST/88 1 set = 2 bh.

SUB JUMLAH 6,751,949 0 6,751,949 G7

JUMLAH = 6,751,949 1 415 Single Phase CT Post Housing the follow CT'S : one 202 BG 002 S 019 Bh 5,360,761 3 0 0 3 16,082,283 0 0 3 16,082,283 PJP.021/PST/88 GI. KRACAK

200/100/5A C1 5P20 for different and restricted e/f protection. 2 417 Alarms Instrument& Control 110V DC Switch - board. 202 BG 002 A 001 Set 4,845,775 1 0 0 1 4,845,775 0 0 1 4,845,775 PJP.021/PST/88 GI. KRACAK3 419 Overhead Earth Wire,Connect. Electrode for main Subtant. Eart 202 BG 002 O 006 Set 679,544 1 0 0 1 679,544 0 0 1 679,544 PJP.021/PST/88 GI. KRACAK4 418 Galvanised stell structure suitable 202 BG 002 G 001 Set 3,202,811 0 0 0 0 - 0 0 0 0 PJP.021/PST/88 TUG 9 : 01/GD/BP/II/11

SUB JUMLAH 21,607,602 0 21,607,602 G8

JUMLAH = 21,607,602 KETERANGAN :

= MATERIAL HABIS = MATERIAL PENCADANGAN = MATERIAL MASUK/RETUR

= MATERIAL MUTASI = MATERIAL SISA BEBAS

Page 15: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPGARDU INDUK

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 2 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 421 Allu Conduct, Connectors, Insulators, and marshaling kiosk etc. 202 BG 002 A 004 Set 8,216,687 2 0 0 2 16,433,374 0 0 2 16,433,374 PJP.021/PST/88 GI. CILEGON2 422 Single Phase Current Transformer Post Hous the follow 202 BG 002 S 017 Bh 13,689,317 3 0 0 3 41,067,951 0 0 3 41,067,951 PJP.021/PST/88 GI. CILEGON

CT'S : one 300/150/5A 45 VA 3 423 Overhead Earth Wire.Connect.Electrode for main Subtant. Earth 202 BG 002 O 009 Set 982,000 2 0 0 2 1,964,000 0 0 2 1,964,000 PJP.021/PST/88 GI. CILEGON

SUB JUMLAH 59,465,325 0 59,465,325 G9

JUMLAH = 59,465,325 1 290 Kawat BC ukuran 120 Sqmm 202 BG 002 K 017 Mtr 12,100 0 0 0 0 - 0 0 0 0 - TUG 9 : 12/GD/BP/IX/20102 295 Terminasi Joint 20 KV GE 202 BG 002 T 001 Set 379,499 3 0 0 3 1,138,497 0 0 3 1,138,497 SPK.379/9220/1991/M. 018-0203 296 Terminasi Joint 20 KV MG 202 BG 002 T 002 Set 379,500 3 0 0 3 1,138,500 0 0 3 1,138,500 SPK.379/9220/1991/M. 018-021

SUB JUMLAH 2,276,997 0 2,276,997 G10

JUMLAH = 2,276,997 1 300 Lampu Mercury 125 W/220 V + kabel NGBFBY uk. 4x6 mm t. 1 202 BG 002 L 004 Set 468,528 11 0 0 11 5,153,808 0 0 11 5,153,808 SPK.382/9220/1991/M 019-002

SUB JUMLAH 5,153,808 0 5,153,808 G11

JUMLAH = 5,153,808 1 301 Kabel Gland ukuran 12 mm 202 BG 002 K 006 Bh 2,470 150 0 0 150 370,500 0 0 150 370,500 SPK.012/9220/1991/M 013-0052 302 Sepatu Kabel ukuran 2,5 mm 202 BG 002 S 007 Bh 245 0 0 0 0 - 0 0 0 0 - TUG 9 : 23/GD/BP/X/083 303 Sepatu Kabel ukuran 4 mm 202 BG 002 S 010 Bh 245 0 0 0 0 - 0 0 0 0 - TUG 9 : 23/GD/BP/X/084 304 Sepatu Kabel ukuran 6 mm 202 BG 002 S 013 Bh 393 0 0 0 0 - 0 0 0 0 - TUG 9 : 23/GD/BP/X/085 305 Sepatu Kabel ukuran 10 mm 202 BG 002 S 004 Bh 643 0 0 0 0 - 0 0 0 0 - TUG 9 : 24/GD/BP/X/086 306 Kawat BC ukuran 120 Sqmm 202 BG 002 K 018 Mtr 12,373 0 0 0 0 - 0 0 0 0 - TUG 9 : 19/GD/BP/XII/067 307 Terminasi kabel power 20 Kv / 240 mm 202 BG 002 T 004 Set 579,700 3 0 0 3 1,739,100 0 0 3 1,739,100 SPK.012/9220/1991/M 013-0178 308 Lamp Mercury 125 W/220 V + kabel NGBFBY uk. 4x6 mm t. 2,4 m 202 BG 002 L 005 Set 646,858 17 0 0 17 10,996,586 0 0 17 10,996,586 SPK.012/9220/1991/M 013-0019 309 Lamp Mercury 125 W/220 V + kabel NGBFBY uk. 4x6 mm t. 1 m 202 BG 002 L 006 Set 563,093 10 0 0 10 5,630,930 0 0 10 5,630,930 SPK.012/9220/1991/M 013-00210 310 Terminasi Mof u/ Joint Cubicle 20 KV type type ASEA 202 BG 002 T 005 Set 579,700 3 0 0 3 1,739,100 0 0 3 1,739,100 SPK.012/9220/1991/M 013-01511 311 Terminasi Mof u/ Joint Cubicle 20 KV MG type IV 202 BG 002 T 003 Set 579,700 3 0 0 3 1,739,100 0 0 3 1,739,100 SPK.012/9220/1991/M 013-01612 312 Amper meter dengan skala penuh 500 A 202 BG 002 A 005 Bh 112,876 3 0 0 3 338,628 0 0 3 338,628 SPK.012/9220/1991/M 013-018

SUB JUMLAH 22,553,944 0 22,553,944 G12

JUMLAH = 22,553,944 1 338 MCB untuk 3 phase 40 A 202 BG 002 M 005 Bh 74,250 5 0 0 5 371,250 0 0 5 371,250 SPK.02/921/1992/M. 014-0012 339 MCB untuk 1 phase 32 A 202 BG 002 M 004 Bh 66,866 2 0 0 2 133,732 0 0 2 133,732 SPK.02/921/1992/M. 014-0023 340 Kabel Gland ukuran 12 mm 202 BG 002 K 002 Bh 2,476 250 0 0 250 619,000 0 0 250 619,000 SPK.02/921/1992/M. 014-0034 341 Kabel Gland ukuran 16 mm 202 BG 002 K 004 Bh 2,723 134 0 0 134 364,882 0 0 134 364,882 SPK.02/921/1992/M. 014-0045 342 Sepatu Kabel ukuran 2,5 mm 202 BG 002 S 008 Bh 248 0 0 0 0 - 0 0 0 0 - TUG 9 : 24/GD/BP/X/086 343 Sepatu Kabel ukuran 4 mm 202 BG 002 S 011 Bh 248 0 0 0 0 - 0 0 0 0 - TUG 9 : 24/GD/BP/X/087 344 Sepatu Kabel ukuran 6 mm 202 BG 002 S 014 Bh 248 0 0 0 0 - 0 0 0 0 - TUG 9 : 25/GD/BP/X/088 345 Sepatu Kabel ukuran 10 mm 202 BG 002 S 005 Bh 495 0 0 0 0 - 0 0 0 0 - TUG 9 : 25/GD/BP/X/089 348 Kawat BC 70 Sqmm u/Grounding 202 BG 002 K 016 Mtr 7,920 80 0 0 80 633,600 0 0 80 633,600 SPK.02/921/1992/M. 014-012

SUB JUMLAH 2,122,464 0 2,122,464 G13

JUMLAH = 2,122,464

Page 16: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPGARDU INDUK

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 3 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 313 Mini Circuit Breakers 3 phase 40 A 202 BG 002 M 006 Bh 74,965 2 0 0 2 149,930 0 0 2 149,930 SPK.011.PJ/9220/91/M. 012-0022 314 Mini Circuit Breakers 1 phase 32 A 202 BG 002 M 003 Bh 59,950 2 0 0 2 119,900 0 0 2 119,900 SPK.011.PJ/9220/91/M. 012-0033 315 Kabel Gland ukuran 12 mm 202 BG 002 K 003 Bh 2,475 150 0 0 150 371,250 0 0 150 371,250 SPK.011.PJ/9220/91/M. 012-0044 316 Kabel Gland ukuran 16 mm 202 BG 002 K 005 Bh 2,750 150 0 0 150 412,500 0 0 150 412,500 SPK.011.PJ/9220/91/M. 012-0055 317 Sepatu Kabel ukuran 2,5 mm 202 BG 002 S 009 Bh 248 0 0 0 0 - 0 0 0 0 - TUG 9 : 25/GD/BP/X/086 318 Sepatu Kabel ukuran 4 mm 202 BG 002 S 012 Bh 248 0 0 0 0 - 0 0 0 0 - TUG 9 : 26/GD/BP/X/087 319 Sepatu Kabel ukuran 6 mm 202 BG 002 S 015 Bh 248 0 0 0 0 - 0 0 0 0 - TUG 9 : 26/GD/BP/X/088 320 Sepatu Kabel ukuran 10 mm 202 BG 002 S 006 Bh 495 0 0 0 0 - 0 0 0 0 - TUG 9 : 26/GD/BP/X/08

SUB JUMLAH 1,053,580 0 1,053,580 G14

JUMLAH = 1,053,580 1 351 20 KV R. Control Panel Type A Outgoing Feeder 202 BG 002 S 033 Set 24,194,752 10 0 0 10 241,947,520 0 0 10 241,947,520 079.PJP/922/1992/M.2 352 20 KV R. Control Panel Type B Outgoing Feeder 202 BG 002 S 034 Set 32,946,001 4 0 0 4 131,784,004 0 0 4 131,784,004 079.PJP/922/1992/M.3 353 20 KV R. Control Panel Type C for Bus Section 202 BG 002 S 035 Set 10,970,023 10 0 0 10 109,700,230 0 0 10 109,700,230 079.PJP/922/1992/M.4 354 20 KV R. Control Panel Type D Shunt Capasitor 202 BG 002 S 036 Set 6,446,999 7 0 0 7 45,128,993 0 0 7 45,128,993 079.PJP/922/1992/M.

SUB JUMLAH 528,560,747 0 528,560,747 G16

JUMLAH = 528,560,747 1 358 Stell Structure to be complete the specified scope 202 BG 002 S 026 Set 39,600,000 1 0 0 1 39,600,000 0 0 1 39,600,000 100.B.PJ/9220/94/M.2 359 150 KV CT for Transformer Bay 150/20 KV with Support (600A) 202 BG 002 C 008 Lot 28,050,000 3 0 0 3 84,150,000 0 0 3 84,150,000 100.B.PJ/9220/94/M.3 361 20 KV Neutral Earthing Resistor 40 Ohm, 1000A. 202 BG 002 N 001 Set 74,200,000 1 0 0 1 74,200,000 0 0 1 74,200,000 100.B.PJ/9220/94/M.4 362 Outdoor 150KV Neutral CT to be Instalated Tank 202 BG 002 O 005 Set 14,850,000 1 0 0 1 14,850,000 0 0 1 14,850,000 100.B.PJ/9220/94/M.

SUB JUMLAH 212,800,000 0 212,800,000 G17

JUMLAH = 212,800,000 1 363 Stell Structure to be complete the specified scope 202 BG 002 S 025 Lot 54,202,500 1 0 0 1 54,202,500 0 0 1 54,202,500 118.C.PJ/9220/94/M.2 364 150 KV 3 phase DS Motor Operated 40 KA, 1250A 202 BG 002 P 015 Set 61,050,000 1 0 0 1 61,050,000 0 0 1 61,050,000 118.C.PJ/9220/94/M.3 365 150 KV CT for Transformer Bay 150/20 KV with Support (300A) 202 BG 002 C 007 Set 55,165,000 0 0 0 0 - 0 0 0 0 - TUG 8:01/GD/BPBS/I/084 367 Alumunium Busbar Conduct and Jumper Conduct Etc. 202 BG 002 A 002 Set 12,925,000 1 0 0 1 12,925,000 0 0 1 12,925,000 118.C.PJ/9220/94/M.5 369 Protection Cubicle for Transformer 150/20 KV 3 Pole 202 BG 002 P 041 Lot 152,295,000 1 0 0 1 152,295,000 0 0 1 152,295,000 118.C.PJ/9220/94/M.6 370 Control Cubicle for Transformer 150/20 KV Diagram 202 BG 002 C 003 Lot 78,925,000 1 0 0 1 78,925,000 0 0 1 78,925,000 118.C.PJ/9220/94/M.7 371 Control Cable, Terminal Blocks, Link, Fuses, Etc 202 BG 002 C 002 Lot 27,390,000 1 0 0 1 27,390,000 0 0 1 27,390,000 118.C.PJ/9220/94/M.

SUB JUMLAH 386,787,500 0 386,787,500 G18

JUMLAH = 386,787,500 1 331 Kabel Gland ukuran 12 mm 202 BG 002 K 001 Bh 2,178 500 0 0 500 1,089,000 0 0 500 1,089,000 SPK. 094.PJ/92/M.2 332 Sepatu Kabel Penampang 2,5 mm 202 BG 002 S 001 Bh 495 0 0 0 0 - 0 0 0 0 - TUG 9 : 27/GD/BP/X/083 333 Sepatu Kabel Penampang 4 mm 202 BG 002 S 002 Bh 495 0 0 0 0 - 0 0 0 0 - TUG 9 : 27/GD/BP/X/084 334 Sepatu Kabel Penampang 6 mm 202 BG 002 S 003 Bh 495 0 0 0 0 - 0 0 0 0 - TUG 9 : 27/GD/BP/X/085 335 Mini Circuit Breaker AC, 3 Phase 40 A 202 BG 002 M 007 Bh 73,634 1 0 0 1 73,634 0 0 1 73,634 SPK. 094.PJ/92/M.

SUB JUMLAH 1,162,634 0 1,162,634 G19

JUMLAH = 1,162,634

Page 17: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPGARDU INDUK

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 4 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 259 Kabel Kontrol NYY 1 KV ukuran 2 x 6 mm 203 BG 003 K 003 Mtr 1,285 0 0 0 0 - 0 0 0 0 PJ.P.003/PST/88 TUG 9 : 13/GD/BP/VII/082 260 Kabel Kontrol NYY 1 KV ukuran 4 x 6 mm 203 BG 003 K 004 Mtr 1,911 0 0 0 0 - 0 0 0 0 PJ.P.003/PST/88 TUG 9 : 17/GD/BP/X/08

SUB JUMLAH - 0 - G20

JUMLAH = 0 1 355 203 BG 003 O 001 Bh 462,000 3 0 0 3 1,386,000 0 0 3 1,386,000 PJ.01/PRINGJB/93/M. 1 Dus 3 bh2 356 203 BG 003 I 001 Bh 533,200 3 0 0 3 1,599,600 0 0 3 1,599,600 PJ.01/PRINGJB/93/M. 1 Dus 3 bh

SUB JUMLAH 2,985,600 0 2,985,600 G22

JUMLAH = 2,985,600 1 185 Battery Charger 48V DC battery complete with panelboard 202 BG 002 D 002 Set 14,583,670 1 0 0 1 14,583,670 0 0 1 14,583,670 129.PJ/PRI.JB/93/M.

SUB JUMLAH 14,583,670 0 14,583,670 G24

JUMLAH = 14,583,670 1 396 Steel struct gantry (13,5m+3,5m) support beam (14m). 202 BG 002 S 024 Set 99,635,619 1 0 0 1 99,635,619 0 0 1 99,635,619 208.PJ/9220/1995/M.

SUB JUMLAH 99,635,619 0 99,635,619 G25

JUMLAH = 99,635,619 1 397 Contr. Cable,term. block,link, fuses, etc.comp the scope of work Lot

* Kabel NYFGBY 2 x 6 mm 202 BG 002 K 012 Mtr 8,015 355 0 0 355 2,845,325 0 0 355 2,845,325 064.PJ/97/M.* Kabel NYFGBY 2 x 10 mm 202 BG 002 K 010 Mtr 11,775 0 0 0 0 0 0 0 0 0 064.PJ/97/M. TUG 9 : 05/GD/BP/V/10

2 404 150 KV CT for feeder bay complete+support core : 1,2,3,4. 202 BG 002 P 016 Set 27,665,735 6 0 0 6 165,994,410 0 0 6 165,994,410 064.PJ/97/M.3 405 Battery Charger for 48 V DC battery 40 A Set PM 1 0 0 1 0 1 064.PJ/97/M.4 406 48 V DC battery suitable for supplying all 48 V DC load Set PM 1 0 0 1 0 1 064.PJ/97/M.

8 hours discharger minimum 250 AH.

SUB JUMLAH 168,839,735 0 168,839,735 G26

JUMLAH = 168,839,735 EX GI. 150KV HAURGEULIS ( PT. VATECH )

1 578 150 KV CT for Bus Copler 1 Type ATHa 170,40 KA/1s. 202 BG 002 C 009 Unit 105,820,000 0 0 0 0 0 0 0 0 0 059.PJ/131/PIKIT JBN/04 TUG 9 : 17/GD/BP/IX/082 579 150 KV CT for Bus Copler 2 Type ATHa 170,40 KA/1s. 202 BG 002 C 010 Unit 105,820,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 17/GD/BP/IX/08

SUB JUMLAH 0 0 0 JUMLAH = 0

1 591 Low Voltage Cubicle Type Freestanding/PRISMA 202 BG 002 R 001 EX GI. 150KV HAURGEULIS PT. ASIH SILAPURNA(E03 + EF10) Bus Coupler (Relay Panel 1A) Set 521,000,000 1 0 0 1 521,000,000 0 0 1 521,000,000 059.PJ/131/PIKIT JBN/04 "

2 592 Low Voltage Cubicle Type Freestanding/BLOCKSET 202 BG 002 B 010(E03 + ES10) 150 KV Bus Coupler Includ Syncrho Panel Set 366,880,000 1 0 0 1 366,880,000 0 0 1 366,880,000 " "(Control Panel 1A with sincronizing Panel)

3 593 LVoltage Cubicle Type Freestanding/PRISMA (EF1000) 202 BG 002 R 002150 KV Busbar Protection. (Busbar Protection Panel) Set 1,171,240,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 19/GD/BP/IX/08

SUB JUMLAH 887,880,000 0 887,880,000 G.28

JUMLAH = 887,880,000

Outdoor Termination Kabel 20 KV ukuran 1 x 150 mm2

Indoor Termination Kabel 20 KV ukuran 1 x 150 mm2

Page 18: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPGARDU INDUK

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 5 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 594 TALL 800 mm2. 202 BG 002 T 009 M 266,961 0 0 0 0 0 0 0 0 0 077.PJ/131/PIKIT JBN/04 TUG 9 : 19/GD/BP/IX/082 595 150 KV Single Susp Insulator Complete+Hardware for 202 BG 002 S 038 0 0

TALL 800 mm2 Compres / Clamp type w/o turnbuckle. Set 10,582,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 19/GD/BP/IX/083 596 L45 Conector 1 x 800 mm2 / 1 x 800 mm2. 202 BG 002 C 012 Bh 2,692,773 0 0 0 0 0 0 0 0 0 " TUG 9 : 20/GD/BP/IX/084 597 T Conector 1 x 800 / 1 x 800 mm2. 202 BG 002 C 013 Bh 2,692,773 0 0 0 0 0 0 0 0 0 " TUG 9 : 20/GD/BP/IX/085 598 150 KV 2500A DS for Bus Side Comp+Clamp&Support Struct. 202 BG 002 D 007 Unit 119,559,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 18/GD/BP/IX/086 600 150 KV CT for Bus Coupler Complete+Clamp & Support Struct. 202 BG 002 C 015 Unit 116,402,000 3 0 0 3 349,206,000 0 0 3 349,206,000 "7 601 150 KV CVT for Bus Coupler Complete+Clamp & Support Struct. 202 BG 002 C 016 Unit 100,364,000 0 0 0 0 0 0 0 0 0 " TUG 8 : 02/GD/BPBS/V/098 602 150 KV Bus Coupler Control Panel. 202 BG 002 B 011 Set 345,653,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 18/GD/BP/IX/089 603 150 KV Bus Coupler Protective Relay Panel. 202 BG 002 B 012 Set 445,749,700 0 0 0 0 0 0 0 0 0 " TUG 9 : 18/GD/BP/IX/0810 604 Marshaling Kiosk. 202 BG 002 M 011 Set 44,242,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 15/GD/BP/VIII/0811 605 Line Trap 150 KV 1600 A?0,5 MH 202 BG 002 L 011 Unit 298,188,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 01/GD/BP/IV/0912 606 Line Matching Unit (LMU) 202 BG 002 L 012 Unit 99,609,400 0 0 0 0 0 0 0 0 0 " TUG 9 : 01/GD/BP/IV/0913 607 Control & Power Cable for BC Feeder Bay : 0 0

A NYSY 1/0,6 KV 2 x 4 mm2. 203 BG 002 K 023 Bay 20,988,220 0 0 0 0 0 0 0 0 0 " TUG 9 : 20/GD/BP/IX/08B NYSY 1/0,6 KV 4 x 4 mm2. 203 BG 002 K 024 Bay 19,525,220 0 0 0 0 0 0 0 0 0 " TUG 9 : 21/GD/BP/IX/08C NYSY 1/0,6 KV 4 x 6 mm2. 203 BG 002 K 025 Bay 32,541,960 0 0 0 0 0 0 0 0 0 " TUG 9 : 21/GD/BP/IX/08D NYSY 1/0,6 KV 4 x 2,5 mm2. 203 BG 002 K 026 Bay 19,525,220 0 0 0 0 0 0 0 0 0 " TUG 9 : 21/GD/BP/IX/08E NYSY 1/0,6 KV 7 x 2,5 mm2. 203 BG 002 K 027 Bay 26,033,590 0 0 0 0 0 0 0 0 0 " TUG 9 : 22/GD/BP/IX/08F NYSY 1/0,6 KV 12 x 2,5 mm2. 203 BG 002 K 028 Bay 39,050,440 0 0 0 0 0 0 0 0 0 " TUG 9 : 22/GD/BP/IX/08G NYSY 1/0,6 KV 19 x 2,5 mm2. 203 BG 002 K 029 Bay 45,558,832 0 0 0 0 0 0 0 0 0 " TUG 9 : 22/GD/BP/IX/08

SUB JUMLAH 349,206,000 0 349,206,000 JUMLAH = 349,206,000 G.29

1 636 Circuit Breaker 150 KV, SF6. 2000A, 40 KA, 202 BG 002 C 017 GI. SURYA CIPTA PT. HILMANINDO Single Pole,Three Phase berikut Supporting Structure. Set 787,923,169 0 0 0 0 0 0 0 0 0 113.PJ/133/PIKIT JBN/06 TUG 9 : 17/GD/BP/IX/08

2 637 Marshaling Kiosk 202 BG 002 M 012 Set 50,182,121 1 0 0 1 50,182,121 0 0 1 50,182,121 113.PJ/133/PIKIT JBN/063 638 Supporting Structure + Capacitor Voltage Transf 150 KV. 202 BG 002 S 039 Set 113,780,623 0 0 0 0 0 0 0 0 0 " TUG 8 : 04/GD/BPBS/III/104 639 Steel Structure u/ Disconecting Switches 150 KV 202 BG 002 S 040 Set 16,142,995 2 0 0 2 32,285,990 0 0 2 32,285,990 "5 640 Steel Structure u/ Current Transformer 150 KV 202 BG 002 S 041 Set 5,381,002 0 0 0 0 0 0 0 0 0 " TUG 9 : 16/GD/BP/VIII/08

SUB JUMLAH 82,468,111 0 82,468,111 JUMLAH = 82,468,111 G.30

1 668 150 KV 40 KA Current Transformer 202 BG 002 C 001 Bh 165,221,770 0 0 0 0 0 0 0 0 0 Ex DKI PJ.108/922/97/M TUG 9 : 03/GD/BP/V/092 669 CVT 150 KV Magrini Galileo 202 BG 002 C 004 Bh 150,203,470 0 0 0 0 0 0 0 0 0 " TUG 9 : 03/GD/BP/V/093 670 T. Clamp 202 BG 002 T 011 Bh 357,500 0 0 0 0 0 0 0 0 0 " TUG 9 : 04/GD/BP/V/09

SUB JUMLAH 0 0 0 JUMLAH = 0 G.32

1 800 150 KV Current Transformer for Line Bay Complete 201 BG 002 C 001 Unit 64,599,285 6 0 0 6 387,595,710 0 0 6 387,595,710 018.PJ/133/PIKIT JBN/07 PT. Meta Epsi2 801 150 KV Capacitor Voltage Transformer 201 BG 002 C 002 Unit 58,981,956 0 0 0 0 0 0 0 0 0 " TUG 8 : 01/GD/BPBS/V/11

SUB JUMLAH 387,595,710 0 387,595,710 JUMLAH = 387,595,710 G.33

TOTAL GI 3,349,001,464

Page 19: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 6 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 184 Spacer Jumper 2 x Zebra 202 BT 002 S 023 Pcs 147,400 191 0 0 191 28,153,400 0 0 191 28,153,400 EX PLN JATENG.

SUB JUMLAH 28,153,400 0 28,153,400 JUMLAH = 28,153,400 T28

1 78 Stub Angle type BBS+9 202 BT 002 S 032 Set 3,864,856 1 0 0 1 3,864,856 0 0 1 3,864,856 53.P/9220/1993/M2 79 Tower type BBS+9 202 BT 002 T 015 Set 17,474,940 1 0 0 1 17,474,940 0 0 1 17,474,940 53.P/9220/1993/M3 83 Anti Clembing Device 202 BT 002 A 006 Set 44,187 5 0 0 5 220,935 0 0 5 220,935 53.P/9220/1993/M4 84 Counterpoice Copper Wire of 55 mm (GSW) 202 BT 002 C 004 Mtr 439 2,178 0 0 2,178 956,142 0 0 2,178 956,142 53.P/9220/1993/M5 86 Compression Term. for Counterpoice witch Bolt Nuts 202 BT 002 C 001 Set 1,624 0 0 0 0 0 0 0 0 0 53.P/9220/1993/M TUG 9 : 01/GD/BP/II/116 87 Earthing Device 202 BT 002 E 001 Pcs 11,014 194 0 0 194 2,136,716 0 0 194 2,136,716 53.P/9220/1993/M

SUB JUMLAH 24,653,589 0 24,653,589 T29

JUMLAH = 24,653,589 1 117 Tower Penyangga 2 CCT type AA6 + 6 202 BG 002 T 006 Set 35,135,326 2 0 0 2 70,270,652 2 70,270,652 0 0 110.C.PJ/9220/94/M. TUG 10 : 21/Trans/R/XII/082 121 Peralatan Kawat Anti Panjat Lengkap 202 BT 002 P 013 Set 330,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 02/GD/BP/II/10

SUB JUMLAH 70,270,652 70,270,652 - T31

JUMLAH = 70,270,652 1 127 Plate Tanda Bahaya 202 BT 002 P 029 Set 130,790 230 0 0 230 30,081,700 0 0 230 30,081,700 063.PJ/9220/1995/M.2 128 Plate Phasa dan Plate Nomor Lengkap 202 BT 002 P 037 Set 130,790 231 0 0 231 30,212,490 0 0 231 30,212,490 063.PJ/9220/1995/M.3 129 Peralatan Pentanahan Lengkap 202 BT 002 P 008 Set 523,160 195 0 0 195 102,016,200 0 0 195 102,016,200 063.PJ/9220/1995/M.

SUB JUMLAH 162,310,390 0 162,310,390 T32

JUMLAH = 162,310,390 1 136 Plate Anti Panjat Lengkap 202 BT 002 P 018 Bh 330,000 18 0 0 18 5,940,000 0 0 18 5,940,000 053.PJ/9220/1995/M.

SUB JUMLAH 5,940,000 0 5,940,000 T33

JUMLAH = 5,940,000 1 161 Peralatan Anti Panjat 202 BT 002 P 012 Set 379,500 15 0 0 15 5,692,500 - 0 15 5,692,500 051.PJ/9220/1995/M.

SUB JUMLAH 5,692,500 0 5,692,500 T38

JUMLAH = 5,692,500 1 167 Double Suspension Insulator String Set 202 BT 002 D 004 Set 2,079,209 48 0 0 48 99,802,032 0 0 48 99,802,032 206.PJ.P/95/M

SUB JUMLAH 99,802,032 0 99,802,032 T40

JUMLAH = 99,802,032

Page 20: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 7 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 176 Tower Type AA 6 + 0 202 BT 002 T 009 Set 38,206,740 6 0 0 6 229,240,440 4 152,826,960 2 76,413,480 060.PJ/9220/1995/M. TUG 10 : 19/TRANS/R/XII/08

2 177 Tower Type AA 6 + 3 202 BT 002 T 011 Set 42,960,773 4 0 0 4 171,843,092 0 0 4 171,843,092 - TUG 10 : 01/TRANSA/R/VII/09

3 179 Tower Type AA 6 + 12 202 BT 002 T 010 Set 54,213,445 6 0 0 6 325,280,670 4 216,853,780 2 108,426,890 -4 182 Peralatan Pentanahan Lengkap 202 BT 002 P 002 Set 528,000 9 0 0 9 4,752,000 0 0 9 4,752,000 060.PJ/9220/1995/M.5 183 Peralatan Panjat Lengkap 202 BT 002 P 009 Set 308,000 146 0 0 146 44,968,000 0 0 146 44,968,000 060.PJ/9220/1995/M.

SUB JUMLAH 776,084,202 369,680,740 406,403,462 T43

JUMLAH = 776,084,202 1 186 Armorrods for 2 x ACSR Zebra 202 BG 002 A 007 Set 82,257 204 0 0 204 16,780,428 0 0 204 16,780,428 129.PJ/PRI.JB/93/M.2 189 Double suspension string for 2 x ACSR Zebra 202 BG 002 D 005 Set 41,667 72 0 0 72 3,000,024 0 0 72 3,000,024 "3 191 Jumper pilot suspension assembly for 2x ACSR Zebra. 202 BG 002 J 001 Set 1,104,057 36 0 0 36 39,746,052 0 0 36 39,746,052 "4 194 Tower Type 4EE 6 + 0 202 BG 002 T 008 Set 158,064,235 1 0 0 1 158,064,235 0 0 1 158,064,235 "

SUB JUMLAH 217,590,739 - 217,590,739 T44

JUMLAH = 217,590,739 T/L 150 KV Patuha-Lagadar ( PT. Twink )

1 530 Tower Type AA6 + 3 202 BT 002 T 028 Unit 115,060,000 28 0 0 28 3,221,680,000 0 0 28 3,221,680,000 078.PJ/131/PIKIT JBN/03 TUG 10 : 03/TRANS/R/IV/08

2 535 Tower Type DDR6 + 3 202 BT 002 T 033 Unit 279,840,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 04/GD/BP/I/083 536 Tower Type 4 DDR6 + 6 202 BT 002 T 034 Unit 831,270,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 04/GD/BP/III/104 537 Danger Plate + Number Plate 202 BT 002 D 007 Bh 550,000 100 0 0 100 55,000,000 100 55,000,000 0 0 " TUG 10 : 11/TRANS/R/XII/08

5 538 Double Suspension Insulator Set 202 BT 002 D 008 Unit 10,890,000 312 0 0 312 3,397,680,000 126 1,372,140,000 186 2,025,540,000 " "6 539 Double Tension Insulator Set 202 BT 002 D 009 Unit 16,005,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 08/GD/BP/VI/087 540 Armour Rod for ACSR Zebra 202 BT 002 A 011 Set 1,045,000 640 0 0 640 668,800,000 304 317,680,000 336 351,120,000 " "8 541 Vibration Damper 202 BT 002 V 003 Bh 715,000 1341 0 0 1,341 958,815,000 1,135 811,525,000 206 147,290,000 " "

SUB JUMLAH 8,301,975,000 2,556,345,000 5,745,630,000 T45

JUMLAH = 8,301,975,000 T/L 150 KV Patuha-Lagadar ( PT. KEMBAR ABADI )

1 556 Konduktor ACSR Zebra 429 mm2 (BS 215). 202 BT 002 K 026 M 47,025 144,000 0 0 144,000 6,771,600,000 144,000 6,771,600,000 0 074.PJ/131/PIKIT JBN/04

SUB JUMLAH 6,771,600,000 6,771,600,000 0 T 47

JUMLAH = 6,771,600,000

Page 21: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 8 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

T/L 150 KV Patuha-Lagadar ( PT. ALHAS )1 557 Line Conductor ACSR 429 mm2 (Zebra) 202 BT 002 K 027 M 47,100 99,000 0 0 99,000 4,662,900,000 99,000 4,662,900,000 0 0 075.PJ/131/PIKIT JBN/04 TUG 10 : 04/TRANS/R/XII/082 558 Ground Steel Wire 55 mm2 202 BT 002 G 003 M 9,200 49,000 0 0 49,000 450,800,000 49,000 450,800,000 0 0 "3 560 Double Tension String Set With Isolator 202 BT 002 D 011 Set 16,143,600 170 0 0 170 2,744,412,000 170 2,744,412,000 0 0 " "4 561 Jumper Pilot Suspension String Set With Isolator 202 BT 002 J 001 Set 7,810,000 6 0 0 6 46,860,000 6 46,860,000 0 0 " TUG 9 : 14/GD/BP/XII/095 562 Low Duty Tension String Set With Isolator 202 BT 002 L 002 Set 16,060,000 6 0 0 6 96,360,000 6 96,360,000 0 0 " "6 563 Reverse Low Duty Tension String Set With Isolator 202 BT 002 L 003 Set 16,060,000 6 0 0 6 96,360,000 6 96,360,000 0 0 " "7 564 Armour Rods For ACSR Zebra 202 BT 002 A 012 Set 1,093,400 0 0 0 0 0 0 0 0 0 " TUG 9 : 09/GD/BP/VI/088 565 Vibration Damper (Zebra) 202 BT 002 V 004 Pcs 751,300 0 0 0 0 0 0 0 0 0 " TUG 9 : 09/GD/BP/VI/089 566 Line Spacer 400 mm 202 BT 002 S 037 Pcs 490,600 0 0 0 0 0 0 0 0 0 " TUG 9 : 13/GD/BP/XII/0910 567 Jumper Spacer 200 mm 202 BT 002 S 036 Pcs 434,500 438 0 0 438 190,311,000 438 190,311,000 0 0 " "11 568 Mids Span Joint 202 BT 002 M 003 Pcs 434,500 200 0 0 200 86,900,000 200 86,900,000 0 0 " "12 569 Armour Rods For GSW 55 mm 202 BT 002 A 013 Set 325,600 129 0 0 129 42,002,400 14 4,558,400 115 37,444,000 " TUG 10 : 06/TRANS/R/XII/0813 570 Vibration Damper (GSW) 202 BT 002 V 005 Pcs 381,700 328 0 0 328 125,197,600 328 125,197,600 0 0 " TUG 10 : 07/TRANS/R/XII/0814 571 Mids Span Joint 202 BT 002 M 004 Pcs 319,000 19 0 0 19 6,061,000 19 6,061,000 0 0 " TUG 10 : 08/TRANS/R/XII/0815 572 Set Of Suspension Clamp Complete 202 BT 002 K 028 Set 575,300 82 0 0 82 47,174,600 0 0 82 47,174,600 " "16 573 Set Of Tension Clamp Complete 202 BT 002 K 029 Set 706,200 0 0 0 0 0 0 0 0 0 " TUG 9 : 11/GD/BP/VI/0817 574 Ground Rod Set 202 BT 002 G 004 Set 1,265,000 4 0 0 4 5,060,000 4 5,060,000 0 0 " "18 575 Tower Fitting Anti Clambing Device 202 BT 002 A 014 Set 522,500 16 0 0 16 8,360,000 16 8,360,000 0 0 " "19 576 Number Plate 202 BT 002 N 005 Set 385,000 126 0 0 126 48,510,000 126 48,510,000 0 0 " TUG 10 : 09/TRANS/R/XII/0820 577 Danger Plate 202 BT 002 D 012 Set 385,000 126 0 0 126 48,510,000 126 48,510,000 0 0 " TUG 10 : 10/TRANS/R/XII/08

SUB JUMLAH 8,705,778,600 8,621,160,000 84,618,600 T 48

JUMLAH = 8,705,778,600 1 608 Common Portion 202 BT 002 C 007 Kg 9,522 268,617 0 0 268,617 2,557,771,074 0 0 268,617 2,557,771,074 008.PJ/063/PIKIT JJ/01 Mat. Surflus Ex BBS2 609 Body Standard ( -3/+0 ) 202 BT 002 B 008 Kg 9,522 2,099 0 0 2,099 19,986,678 0 0 2,099 19,986,678 " "3 610 Body +9/+12 202 BT 002 B 009 Kg 9,522 7,963 0 0 7,963 75,823,686 0 0 7,963 75,823,686 " "4 611 Leg Extention 8M 202 BT 002 L 004 Kg 9,522 2,014 0 0 2,014 19,177,308 0 0 2,014 19,177,308 " "5 612 Leg Extention 9M 202 BT 002 L 005 Kg 9,522 3,145 0 0 3,145 29,946,690 0 0 3,145 29,946,690 " "6 613 Leg Extention 10M 202 BT 002 L 006 Kg 9,522 737 0 0 737 7,017,714 0 0 737 7,017,714 " "7 614 Leg Extention 11M 202 BT 002 L 007 Kg 9,522 548 0 0 548 5,218,056 0 0 548 5,218,056 " "8 615 Leg Extention 13M 202 BT 002 L 008 Kg 9,522 6,010 0 0 6,010 57,227,220 0 0 6,010 57,227,220 " "9 616 Leg Extention 14M 202 BT 002 L 009 Kg 9,522 4,709 0 0 4,709 44,839,098 0 0 4,709 44,839,098 " "10 617 Leg Extention 16M 202 BT 002 L 010 Kg 9,522 5,349 0 0 5,349 50,933,178 0 0 5,349 50,933,178 " "

SUB JUMLAH 2,867,940,702 0 2,867,940,702 JUMLAH = 2,867,940,702

Page 22: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 9 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

TOWER TYPE BB :1 618 Leg Ext. 6M 202 BT 002 L 011 Kg 9,522 7,874 0 0 7,874 74,976,228 0 0 7,874 74,976,228 008.PJ/063/PIKIT JJ/01 Mat. Surflus Ex BBS2 619 Leg Ext. 7M 202 BT 002 L 012 Kg 9,522 790 0 0 790 7,522,380 0 0 790 7,522,380 " "3 620 Leg Ext. 12M 202 BT 002 L 013 Kg 9,522 4,432 0 0 4,432 42,201,504 0 0 4,432 42,201,504 " "

TOWER TYPE CC :1 621 Common Portion 202 BT 002 C 007 Kg 9,522 16,669 0 0 16,669 158,722,218 0 0 16,669 158,722,218 " "2 622 Body Standard 202 BT 002 B 008 Kg 9,522 3,524 0 0 3,524 33,555,528 0 0 3,524 33,555,528 " "3 623 Leg Ext. 4M 202 BT 002 L 014 Kg 9,522 1,452 0 0 1,452 13,825,944 0 0 1,452 13,825,944 " "4 624 Leg Ext. 9M 202 BT 002 L 005 Kg 9,522 1,643 0 0 1,643 15,644,646 0 0 1,643 15,644,646 " "5 625 Leg Ext. 11M 202 BT 002 L 007 Kg 9,522 1,230 0 0 1,230 11,712,060 0 0 1,230 11,712,060 " "6 626 Leg Ext. 12M 202 BT 002 L 013 Kg 9,522 1,711 0 0 1,711 16,292,142 0 0 1,711 16,292,142 " "7 627 Leg Ext. 13M 202 BT 002 L 008 Kg 9,522 4,830 0 0 4,830 45,991,260 0 0 4,830 45,991,260 " "

TOWER TYPE DD :1 628 Common Portion 202 BT 002 C 007 Kg 9,522 96,071 0 0 96,071 914,788,062 0 0 96,071 914,788,062 " "2 629 Leg Ext. 7M 202 BT 002 L 012 Kg 9,522 3,584 0 0 3,584 34,126,848 0 0 3,584 34,126,848 " "3 630 Leg Ext. 8M 202 BT 002 L 004 Kg 9,522 1,436 0 0 1,436 13,673,592 0 0 1,436 13,673,592 " "4 631 Leg Ext. 9M 202 BT 002 L 005 Kg 9,522 1,704 0 0 1,704 16,225,488 0 0 1,704 16,225,488 " "5 632 Leg Ext. 10M 202 BT 002 L 006 Kg 9,522 1,881 0 0 1,881 17,910,882 0 0 1,881 17,910,882 " "6 633 Leg Ext. 12M 202 BT 002 L 013 Kg 9,522 2,237 0 0 2,237 21,300,714 0 0 2,237 21,300,714 " "7 634 Leg Ext. 13M 202 BT 002 L 008 Kg 9,522 2,344 0 0 2,344 22,319,568 0 0 2,344 22,319,568 " "" "

TOWER TYPE EE/FF :1 635 Common Portion 202 BT 002 C 007 Kg 9,522 69,870 0 0 69,870 665,302,140 0 0 69,870 665,302,140 " "

SUB JUMLAH 2,126,091,204 0 2,126,091,204 JUMLAH = 2,126,091,204 T.50

MATERIAL TOWER T/L 150 KV Patuha-Lagadar PT. KEMBAR ABADI1 642 Tower Type BB6 - 3 (tanpa Stub ) 202 BT 002 T 049 Unit 174,494,910 0 0 0 0 0 0 0 0 0 021.PJ/131/PIKIT JBN/07 TUG 9 : 17/GD/BP/X/072 643 Tower Type BB6 + 0 (tanpa stub) 202 BT 002 T 050 Unit 189,569,633 0 0 0 0 0 0 0 0 0 " TUG 9 : 13/GD/BP/X/073 644 Tower Type BB6 + 3 (tanpa stub) 202 BT 002 T 029 Unit 214,580,339 0 0 0 0 0 0 0 0 0 " TUG 9 : 01/GD/BP/I/084 645 Tower Type BB6 + 6 (tanpa stub) 202 BT 002 T 051 Unit 231,549,386 0 0 0 0 0 0 0 0 0 " TUG 9 : 01/GD/BP/I/085 646 Tower Type BB6 + 9 (1 berikut stub , 2 unit tanpa stub) 202 BT 002 T 052 Unit 263,588,970 1 0 0 1 263,588,970 1 263,588,970 0 0 Stub diambil 27-9-07 TUG 10 : 18/TRANS/R/XII/086 647 Tower Type BB6 + 12 (tanpa stub) 202 BT 002 T 053 Unit 291,745,565 0 0 0 0 0 0 0 0 0 " TUG 9 : 02/GD/BP/I/087 648 Tower Type CC6 - 3 (Stub habis) 202 BT 002 T 058 Unit 198,580,687 0 0 0 0 0 0 0 0 0 " (Stub 27907) 9 : 14/GD/BP/X/078 649 Tower Type CC6 + 0 (Stub habis) 202 BT 002 T 022 Unit 210,185,804 0 0 0 0 0 0 0 0 0 " Stub sudah diambil 28-12-079 650 Tower Type CC6 + 3 (tanpa stub) 202 BT 002 T 031 Unit 253,643,146 0 0 0 0 0 0 0 0 0 " TUG 9 : 14/GD/BP/X/0710 651 Tower Type CC6 + 9 (stub habis, 2 unit tanpa stub) 202 BT 002 T 055 Unit 335,768,570 0 0 0 0 0 0 0 0 0 " Stub sudah diambil 27-9-0711 652 Tower Type DD6 - 3 (tanpa stub) 202 BT 002 T 059 Unit 288,147,816 0 0 0 0 0 0 0 0 0 " TUG 9 : 02/GD/BP/I/0812 653 Tower Type DD6 + 6 (stub habis) 202 BT 002 T 056 Unit 429,983,299 0 0 0 0 0 0 0 0 0 " (Stub 27907) 9 : 15/GD/BP/X/0713 654 Tower Type DD6 + 9 (tanpa stub) 202 BT 002 T 057 Unit 434,156,970 0 0 0 0 0 0 0 0 0 " TUG 9 : 03/GD/BP/I/0814 655 Danger Plate + Number Plate 202 BT 002 D 007 Bh 585,200 40 0 0 40 23,408,000 40 23,408,000 0 0 " TUG 10 : 13/TRANS/R/XII/0815 656 Anti Clambing 202 BT 002 A 006 Set 770,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 03/GD/BP/I/08

MATERIAL GANTRY 021.PJ/131/PIKIT JBN/07 PT. KEMBAR ABADI1 657 Tower T = 10 M 202 BT 002 G 060 Unit 56,256,905 0 0 0 0 0 0 0 0 0 " TUG 9 : 10/GD/BP/X/092 658 BEAM = 14 M 202 BT 002 G 061 Unit 34,155,978 0 0 0 0 0 0 0 0 0 " TUG 9 : 10/GD/BP/X/093 659 Danger Plate + Number Plate 202 BT 002 D 007 Bh 585,200 0 0 0 0 0 0 0 0 0 " TUG 9 : 11/GD/BP/X/094 660 Anti Clambing 202 BT 002 A 006 Set 770,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 11/GD/BP/X/09

SUB JUMLAH 286,996,970 286,996,970 0 JUMLAH = 286,996,970 T.51

Page 23: September 11

PJJB/FML/8-75

Page 24: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 10 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

U. Berung - R. Kasumba PT. Wina Perdana Jaya1 661 Tower Type 4 BB6 + 9 202 BT 002 T 060 Unit 843,853,260 0 0 0 0 0 0 0 0 0 093.AM-2/131/PIKIT JBN/08 TUG 9 : 13/GD/BP/XII/092 662 Tower Type 4 BB6 + 12 202 BT 002 T 061 Unit 932,771,698 0 0 0 0 0 0 0 0 0 " "3 663 Tower Type 4 DD6 + 9 202 BT 002 T 062 Unit 1,675,962,092 0 0 0 0 0 0 0 0 0 " "4 664 Danger Plate with fixing Facilities 202 BT 002 D 013 Set 204,050 0 0 0 0 0 0 0 0 0 " TUG 9 : 14/GD/BP/XII/095 665 Number Plate & Phase Plate + Fixing Facilities 202 BT 002 N 006 Set 204,050 0 0 0 0 0 0 0 0 0 " "6 666 Anti Clambing Guards 202 BT 002 A 007 Set 204,050 0 0 0 0 0 0 0 0 0 " "

SUB JUMLAH 0 0 0 JUMLAH = 0 T.52

1 667 Six Single Line Conductor ACSR 1x240/40 mm2 (Hawk) 202 BT 002 S 001 M 40,222 210,000 0 0 210,000 8,446,620,000 210,000 8,446,620,000 0 0 159.PJ/131/PIKIT JBN/07 PT. MEGA ELTRA

SUB JUMLAH 8,446,620,000 8,446,620,000 0 JUMLAH = 8,446,620,000 T.53

I. Material Tower T/L 150 KV Patuha-Lagadar PT. BINA NOVITA1 668 Tower AA6 + 12 Modif AA6 + 9 (T.4) 202 BT 002 T 10A Kg 25,300 0 0 0 0 0 0 0 0 0 029.P/041/PROKIT JBR/08 TUG 9 : 05/GD/BP/VI/092 669 Tower AA6 + 12 Modif AA6 + 9 (T.13) 202 BT 002 T 10B Kg 25,300 0 0 0 0 0 0 0 0 0 " TUG 9 : 07/GD/BP/VII/093 670 Tower AA6 + 12 Modif AA6 + 9 (T.20) 202 BT 002 T 10C Kg 25,300 713 0 0 713 18,038,900 713 18,038,900 0 0 "4 671 Tower AA6 + 0 (T.21) 202 BT 002 T 09A Kg 25,300 47 0 0 47 1,189,100 47 1,189,100 0 0 "5 672 Tower AA6 + 9 (T.34) 202 BT 002 T 001 Kg 25,300 53 0 0 53 1,340,900 53 1,340,900 0 0 "6 673 Tower AA6 + 9 (T.36) 202 BT 002 T 01A Kg 25,300 41 0 0 41 1,037,300 41 1,037,300 0 0 "7 674 Tower CC6 + 0 (T55) 202 BT 002 T 58A Kg 25,300 5 0 0 5 126,500 5 126,500 0 0 "8 675 Tower AA6 + 12 Modif AA6 + 9 (T.58) 202 BT 002 T 10D Kg 25,300 1,315 0 0 1,315 33,269,500 1,315 33,269,500 0 0 "9 676 Tower AA6 + 12 Modif AA6 + 6 (T.60) 202 BT 002 T 10E Kg 25,300 1,399 0 0 1,399 35,394,700 1,399 35,394,700 0 0 "10 677 Tower AA6 + 12 Modif AA6 + 9 (T.65) 202 BT 002 T 10F Kg 25,300 1,250 0 0 1,250 31,625,000 1,250 31,625,000 0 0 "11 678 Tower AA6 + 12 Modif AA6 + 9 (T.78) 202 BT 002 T 10G Kg 25,300 1,670 0 0 1,670 42,251,000 1,670 42,251,000 0 0 "12 679 Tower AA6 + 0 Modif AA6 + 9 (T.80) 202 BT 002 T 09B Kg 25,300 3,584 0 0 3,584 90,675,200 3,584 90,675,200 0 0 "13 680 Tower AA6 + 0 (T.82) 202 BT 002 T 09C Kg 25,300 234 0 0 234 5,920,200 234 5,920,200 0 0 "14 681 Tower AA6 + 0 (T.85) 202 BT 002 T 09D Kg 25,300 198 0 0 198 5,009,400 198 5,009,400 0 0 "15 682 Tower AA6 + 0 Modif AA6 + 6 (T.91) 202 BT 002 T 09E Kg 25,300 3,698 0 0 3,698 93,559,400 3,698 93,559,400 0 0 "16 683 Tower AA6 + 6 (T.94) 202 BT 002 T 28A Kg 25,300 1,123 0 0 1,123 28,411,900 1,123 28,411,900 0 0 "17 684 Tower AA6 + 6 (T.95) 202 BT 002 T 28B Kg 25,300 1,102 0 0 1,102 27,880,600 1,102 27,880,600 0 0 "18 685 Tower AA6 + 0 Modif AA6 + 9 (T.103) 202 BT 002 T 09F Kg 25,300 3,773 0 0 3,773 95,456,900 3,773 95,456,900 0 0 "19 686 Tower AA6 + 0 Modif AA6 + 9 (T.108) 202 BT 002 T 09G Kg 25,300 4,243 0 0 4,243 107,347,900 4,243 107,347,900 0 0 "20 687 II. Material Mur & Baud 202 BT 002 M 005 Kg 41,800 0 0 0 0 0 0 0 0 0 " TUG 9 : 06/GD/BP/VI/09

SUB JUMLAH 618,534,400 618,534,400 0 JUMLAH = 618,534,400 T.54

Page 25: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 11 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 688 Six twin line conductors ACSR 429/57 mm2 (Zebra) 202 BT 002 S 045 Mtr 71,917 14,400 0 0 14,400 1,035,604,800 14,400 1,035,604,800 0 0 228.AM-6/131/PIKITRING PT. Hasta Surya2 689 One earth conductor, GSW 55 mm2 202 BT 002 O 013 Mtr 11,079 1,200 0 0 1,200 13,294,800 1,200 13,294,800 0 0 JBN/09 Nusantara3 690 One earth conductor, OPGW 70 mm2, 12 cores,complete 202 BT 002 O 014 Mtr 45,179 300 0 0 300 13,553,700 300 13,553,700 0 0 " (Cikedung Incomer)

+ joint boxes, fixing device, fixing clamps and necessaryaccessories

4 691 Set of three twin ACSR 429/57 mm2 (Zebra) downleads 202 BT 002 S 046 Sets 104,786,550 2 0 0 2 209,573,100 2 209,573,100 0 0 "to substantion gantry (including low duty inverse insulator sets /120 KN-Normal Type)

5 692 Set of single GSW 55 mm2 earth conductor to substation 202 BT 002 S 047 Sets 27,600,430 1 0 0 1 27,600,430 1 27,600,430 0 0 "gantry including all fittings

6 693 Set of single OPGW 70 mm2 earth conductors to subs - 202 BT 002 S 048 Sets 31,948,675 1 0 0 1 31,948,675 1 31,948,675 0 0 "tation gantry including all fittings.

7 694 Set of Gantry Boxes (GB) complete, installed on subs - 202 BT 002 S 049 Sets 7,802,630 1 0 0 1 7,802,630 1 7,802,630 0 0 "tation gantry

8 695 Fiber optic Armourod (FA) cable, 4 cores, to connecting 202 BT 002 F 004 Sets 10,222,630 1 0 0 1 10,222,630 1 10,222,630 0 0 "OPGW (GB) and OTB in telcom. room/substation buildingapprox. 400 m per-set

9 696 Optic terminal boxes (OTB) installed to termination FA 202 BT 002 O 015 Sets 3,215,630 1 0 0 1 3,215,630 1 3,215,630 0 0 "cable at Telecom. room Fiber optic Armourod (FA) cable

10 697 Armour Rod for earthwire GSW 55 mm2 202 BT 002 A 021 Sets 116,325 4 0 0 4 465,300 4 465,300 0 0 "11 698 Line conductor vibration dampers 202 BT 002 L 034 Sets 495,000 96 0 0 96 47,520,000 96 47,520,000 0 0 "12 699 Earth conductor vibration dampers for GSW 55 mm2 202 BT 002 E 016 Sets 275,000 8 0 0 8 2,200,000 8 2,200,000 0 0 "13 700 Earth conductor vibration dampers for OPGW 70 mm2 202 BT 002 E 017 Sets 275,000 8 0 0 8 2,200,000 8 2,200,000 0 0 "14 701 Line conductor spacers (span) 400 mm 202 BT 002 L 035 Sets 307,725 72 0 0 72 22,156,200 72 22,156,200 0 0 "15 702 Line conductor spacers (jumper) 200 mm 202 BT 002 L 036 Sets 342,045 26 0 0 26 8,893,170 26 8,893,170 0 0 "16 703 Tension set single string (210 KN Normal Type/Type B) 202 BT 002 T 080 Sets 7,150,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 06/GD/BP/VIII/1017 704 Jumper suspension set single string (120 KN Normal 202 BT 002 J 005 Sets 1,430,220 6 0 0 6 8,581,320 6 8,581,320 0 0 "

Type /Type A)18 705 Ground wire tension set for GSW 55 mm2 202 BT 002 G 015 Sets 1,210,000 4 0 0 4 4,840,000 4 4,840,000 0 0 "19 706 Ground wire tension set for OPGW 70 mm2 202 BT 002 G 016 Sets 1,210,000 4 0 0 4 4,840,000 4 4,840,000 0 0 "20 707 Type DD6 +6 Tower 202 BT 002 T 081 Unit 428,392,497 2 0 0 2 856,784,994 2 856,784,994 0 0 "21 708 Type DDR6 ±0 Tower (Standard Height) 202 BT 002 T 082 Unit 370,650,440 2 0 0 2 741,300,880 2 741,300,880 0 0 "22 709 Danger Plate with fixing facilities 202 BT 002 D 022 Sets 412,500 4 0 0 4 1,650,000 4 1,650,000 0 0 "23 710 Number Plate & Phase Plate with fixing facilities 202 BT 002 N 011 Sets 412,500 4 0 0 4 1,650,000 4 1,650,000 0 0 "24 711 Anti climbing guards 202 BT 002 A 023 Sets 1,210,000 4 0 0 4 4,840,000 4 4,840,000 0 0 "

SUB JUMLAH 3,060,738,259 3,060,738,259 0 JUMLAH = 3,060,738,259 T.55

1 712 Six twin line conductors ACSR 2 x 282/46 mm2 (Dove) 202 BT 002 S 038 Mtr 48,021 28,800 0 0 28,800 1,383,004,800 28,800 1,383,004,800 0 0 227.AM-6/131/PIKITRING PT. Intan Mufakat Raya2 713 One earth conductor, GSW 55 mm2 202 BT 002 O 010 Mtr 14,683 2,400 0 0 2,400 35,239,200 2,400 35,239,200 0 0 JBN/09 (Cibabat Incomer)3 714 One earth conductor, OPGW 70 mm2, 12 cores, complete 202 BT 002 O 011 Mtr 60,392 2,400 0 0 2,400 144,940,800 2,400 144,940,800 0 0 "

with joint boxes, fixing device, fixing clamps and necessary accessories.

SUB JUMLAH A 1,563,184,800 1,563,184,800 0 T.56

Page 26: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 12 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

SUB JUMLAH A 1,563,184,800 1,563,184,800 0 4 715 Set of three twin ACSR 2 x 282/46 mm2 (Dove) downleads to 202 BT 002 S 039 Sets 32,329,259 2 0 0 2 64,658,518 2 64,658,518 0 0 227.AM-6/131/PIKITRING PT. Intan Mufakat Raya

substantion gantry (including heavy duty inverse insulator set JBN/09 (Cibabat Incomer) /120 KN-Fog Type)

5 716 Set of single GSW 55 mm2 earth conductor to subs - 202 BT 002 S 040 Sets 5,188,517 1 0 0 1 5,188,517 1 5,188,517 0 0 "tation gantry including all fittings

6 717 Set of single OPGW 70 mm2 earth conductors to subs - 202 BT 002 S 041 Sets 12,044,881 1 0 0 1 12,044,881 1 12,044,881 0 0 "tantion gantry including all fittings

7 718 Set of Gantry Boxes (GB) complete, installed on subs - 202 BT 002 S 042 Sets 7,959,635 1 0 0 1 7,959,635 1 7,959,635 0 0 "tation gantry

8 719 Fiber optic Armourod (FA) cable, 12 cores, to connecting 202 BT 002 F 003 Sets 9,665,735 1 0 0 1 9,665,735 1 9,665,735 0 0 "OPGW (GB) + OTB in telcom. room/substation building approx. 400 m per-set

9 720 Optic terminal boxes (OTB) installed to termination FA 202 BT 002 O 012 Sets 9,665,735 1 0 0 1 9,665,735 1 9,665,735 0 0 "cable at Telecom. room Fiber optic Armourod (FA) cable

10 721 Armour Rod for conductor ACSR 2 x 282/46 mm2 (Dove) 202 BT 002 A 017 Sets 604,241 30 0 0 30 18,127,230 30 18,127,230 0 0 "11 722 Armour Rod for earthwire GSW 55 mm2 202 BT 002 A 018 Sets 305,679 5 0 0 5 1,528,395 5 1,528,395 0 0 "12 723 Armour Rod for earthwire OPGW 70 mm2 202 BT 002 A 019 Sets 76,769 5 0 0 5 383,845 5 383,845 0 0 "13 724 Line conductor vibration dampers 202 BT 002 L 031 Sets 639,782 66 0 0 66 42,225,612 66 42,225,612 0 0 "14 725 Earth conductor vibration dampers for GSW 55 mm2 202 BT 002 E 014 Sets 216,821 22 0 0 22 4,770,062 22 4,770,062 0 0 "15 726 Earth conductor vibration dampers for OPGW 70 mm2 202 BT 002 E 015 Sets 245,256 22 0 0 22 5,395,632 22 5,395,632 0 0 "16 727 Line conductor spacers (span) 400 mm 202 BT 002 L 032 Sets 350,462 30 0 0 30 10,513,860 30 10,513,860 0 0 "17 728 Line conductor spacers (jumper) 200 mm 202 BT 002 L 033 Sets 350,462 66 0 0 66 23,130,492 66 23,130,492 0 0 "18 729 Suspens. set single string (120 KN Normal Type/Type A) 202 BT 002 S 043 Sets 3,870,702 30 0 0 30 116,121,060 30 116,121,060 0 0 "19 730 Suspens. set double string (120 KN Normal Type/Type A) 202 BT 002 S 044 Sets 7,741,404 18 0 0 18 139,345,272 18 139,345,272 0 0 "20 731 Tension set single string (210 KN Normal Type/Type B) 202 BT 002 T 075 Sets 4,222,581 72 0 0 72 304,025,832 72 304,025,832 0 0 "21 732 Tension set double string (120 KN Fog Type/Type D) 202 BT 002 T 076 Sets 8,445,162 12 0 0 12 101,341,944 12 101,341,944 0 0 "22 733 Inverse Doublee string (210 KN Normal Type / Type A) 202 BT 002 I 003 Sets 8,445,162 6 0 0 6 50,670,972 6 50,670,972 0 0 "23 734 Jumper suspension set single string (120 KN Normal 202 BT 002 J 004 Sets 3,870,702 8 0 0 8 30,965,616 8 30,965,616 0 0 "

Type /Type A)24 735 Ground wire suspension set for GSW 55 mm2 202 BT 002 G 011 Sets 781,957 5 0 0 5 3,909,785 5 3,909,785 0 0 "25 736 Groundwire suspension set for OPGW 70 mm2 202 BT 002 G 012 Sets 1,017,258 5 0 0 5 5,086,290 5 5,086,290 0 0 "26 737 Ground wire tension set for GSW 55 mm2 202 BT 002 G 013 Sets 1,029,699 6 0 0 6 6,178,194 6 6,178,194 0 0 "27 738 Ground wire tension set for OPGW 70 mm2 202 BT 002 G 014 Sets 1,135,618 6 0 0 6 6,813,708 6 6,813,708 0 0 "28 739 Type AA7 +3 Tower 202 BT 002 T 077 Unit 183,622,929 1 0 0 1 183,622,929 1 183,622,929 0 0 "29 740 Type AA7 +6 Tower 202 BT 002 T 078 Unit 199,056,131 1 0 0 1 199,056,131 1 199,056,131 0 0 "30 741 Type CC7 +3 Tower 202 BT 002 T 079 Unit 273,333,790 1 0 0 1 273,333,790 1 273,333,790 0 0 "31 742 Danger Plate with fixing facilities 202 BT 002 D 021 Sets 533,159 3 0 0 3 1,599,477 3 1,599,477 0 0 "32 743 Number Plate & Phase Plate with fixing facilities 202 BT 002 N 010 Sets 533,159 3 0 0 3 1,599,477 3 1,599,477 0 0 "33 744 Anti climbing guards 202 BT 002 A 020 Sets 1,563,914 3 0 0 3 4,691,742 3 4,691,742 0 0 "

SUB JUMLAH 3,206,805,168 3,206,805,168 0 JUMLAH = 3,206,805,168 T.56

Page 27: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 13 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 745 Six twin line conductors ACSR 429/57 mm2 (Zebra) 202 BT 002 S 050 Mtr 87,531 33,240 0 0 33,240 2,909,530,440 33,240 2,909,530,440 0 0 230.AM-6/131/PIKITRING Beverint Mekadaya2 746 One earth conductor, GSW 55 mm2 202 BT 002 O 016 Mtr 8,149 2,770 0 0 2,770 22,572,730 2,770 22,572,730 0 0 JBN/09 Konsorsium3 747 One earth conductor, OPGW 70 mm2, 12 cores, complet 202 BT 002 O 017 Mtr 61,042 1,200 0 0 1,200 73,250,400 1,200 73,250,400 0 0 " (Kiaracondong II Incomer)

with joint boxes, fixing device, fixing clamps and necessary accessories.

4 748 Set of single OPGW 70 mm2 earth conductors to subs - 202 BT 002 S 053 Sets 33,009,631 1 0 0 1 33,009,631 1 33,009,631 0 0 "tation gantry including all fittings.

5 749 Set of Gantry Boxes (GB) complete, installed on subs - 202 BT 002 S 054 Sets 2,656,790 1 0 0 1 2,656,790 1 2,656,790 0 0 "tation gantry.

6 750 Fiber optic Armourod (FA) cable, 4 cores, to connecting 202 BT 002 F 005 Sets 3,218,838 1 0 0 1 3,218,838 1 3,218,838 0 0 "OPGW (GB) and OTB in telcom. room/substation buildingapprox. 400 m per-set

7 751 Optic terminal boxes (OTB) installed to termination FA 202 BT 002 O 018 Sets 2,656,790 1 0 0 1 2,656,790 1 2,656,790 0 0 "cable at Telecom. room Fiber optic Armourod (FA) cable

8 752 Armour Rod for earthwire GSW 55 mm2 202 BT 002 A 024 Sets 83,183 4 0 0 4 332,732 4 332,732 0 0 "9 753 Line conductor vibration dampers 202 BT 002 L 037 Sets 149,986 96 0 0 96 14,398,656 96 14,398,656 0 0 "10 754 Earth conductor vibration dampers for GSW 55 mm2 202 BT 002 E 018 Sets 62,350 8 0 0 8 498,800 8 498,800 0 0 "11 755 Earth conductor vibration dampers for OPGW 70 mm2 202 BT 002 E 019 Sets 230,921 8 0 0 8 1,847,368 8 1,847,368 0 0 "12 756 Line conductor spacers (span) 400 mm 202 BT 002 L 038 Sets 51,066 72 0 0 72 3,676,752 72 3,676,752 0 0 "13 757 Line conductor spacers (jumper) 200 mm 202 BT 002 L 039 Sets 61,183 26 0 0 26 1,590,758 26 1,590,758 0 0 "14 758 Tension set single string (210 KN Normal Type/Type B) 202 BT 002 T 083 Sets 6,014,465 36 0 0 36 216,520,740 36 216,520,740 0 0 "15 759 Jumper suspension set single string (120 KN Normal 202 BT 002 J 006 Sets 4,171,932 6 0 0 6 25,031,592 6 25,031,592 0 0 "

Type /Type A)16 760 Ground wire tension set for GSW 55 mm2 202 BT 002 G 017 Sets 191,667 4 0 0 4 766,668 4 766,668 0 0 "17 761 Ground wire tension set for OPGW 70 mm2 202 BT 002 G 018 Sets 2,601,729 4 0 0 4 10,406,916 4 10,406,916 0 0 "18 762 Type BB6 +3 Tower 202 BT 002 T 084 Unit 196,694,290 1 0 0 1 196,694,290 1 196,694,290 0 0 "19 763 Type DDR6 +3 Tower 202 BT 002 T 085 Unit 320,040,030 1 0 0 1 320,040,030 1 320,040,030 0 0 "20 764 Danger Plate with fixing facilities 202 BT 002 D 023 Sets 118,030 3 0 0 3 354,090 3 354,090 0 0 "21 765 Number Plate & Phase Plate with fixing facilities 202 BT 002 N 012 Sets 171,987 3 0 0 3 515,961 3 515,961 0 0 "22 766 Anti climbing guards 202 BT 002 A 026 Sets 366,455 2 0 0 2 732,910 2 732,910 0 0 "

SUB JUMLAH 3,840,303,882 3,840,303,882 0 JUMLAH = 3,840,303,882 T.57

Page 28: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 14 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 767 One earth conductor, GSW 95 mm² 202 BT 002 O 019 Mtr 23,654 900 0 0 900 21,288,600 900 21,288,600 0 0 210.AM-5/131/PIKITRING Konsorsium PT. Altasia2 768 One earth conductor,OPGW 100 mm² complete + joint boxes 202 BT 002 O 020 Mtr 23,654 900 0 0 900 21,288,600 900 21,288,600 0 0 JBN/09 Utama - PT. Prima Estika

fixing devices, fixing clamps and necessary accessories (Ujung Berung Incomer)3 769 Set of Gantry Boxes (GB) complete, installed on subs - 202 BT 002 S 058 Sets 14,685,550 0 0 0 0 0 0 0 0 0 " TUG 9 : 08/GD/BP/VIII/10

tation gantry Ujung Berung 4 770 Line conductor ACSR 282/46 mm2 (Dove) spacer damper 202 BT 002 L 040 Sets 863,368 54 0 0 54 46,621,872 54 46,621,872 0 0 "

(span) 450 mm 5 771 Earth conductor GSW vibration dampers 202 BT 002 E 020 Sets 98,010 18 0 0 18 1,764,180 18 1,764,180 0 0 "6 772 Earth conductor OPGW vibration dampers 202 BT 002 E 021 Sets 125,884 18 0 0 18 2,265,912 18 2,265,912 0 0 "7 773 Line conductor ACSR 282/46 mm2 (Dove) spacer 202 BT 002 L 041 Sets 863,368 0 0 0 0 0 0 0 0 0 " TUG 9 : 08/GD/BP/VIII/10

(Jumper) 250 mm 8 774 Tension set insulator (160 KN/Normal Type ) with arching 202 BT 002 T 086 Sets 32,668,350 12 0 0 12 392,020,200 12 392,020,200 0 0 "

horn line ends9 775 Terminal approach Tension set insulator (160 KN/Normal 202 BT 002 T 088 Sets 5,335,550 6 0 0 6 32,013,300 6 32,013,300 0 0 "

Type) with arching horn both ends10 776 Light duty tension set insulator (160 KN/Normal Type ) 202 BT 002 L 042 Sets 27,335,550 6 0 0 6 164,013,300 6 164,013,300 0 0 "11 777 Inverse Light duty tension set insulator (160 KN/Normal T 202 BT 002 I 004 Sets 27,335,550 6 0 0 6 164,013,300 6 164,013,300 0 0 "12 778 Jumper pilot suspension set insulator (160 KN/Normal Typ 202 BT 002 J 007 Sets 10,342,750 9 0 0 9 93,084,750 9 93,084,750 0 0 "13 779 Ground wire tension clamp (GSW 95 mm²) 202 BT 002 G 019 Sets 1,518,550 6 0 0 6 9,111,300 6 9,111,300 0 0 "14 780 Ground wire tension clamp (OPGW 100 mm²) 202 BT 002 G 020 Sets 2,618,550 6 0 0 6 15,711,300 6 15,711,300 0 0 "

SUB JUMLAH 963,196,614 963,196,614 0 JUMLAH = 963,196,614 T.58

1 781 One earth conductor, GSW 55 mm² 202 BT 002 O 021 Mtr 6,936 0 0 0 0 0 0 0 0 0 225.AM-7/131/PIKIT JBN/09 TUG 9 : 02/GD/BP/III/11Ibnu Taryu - Emsindo

SUB JUMLAH 0 0 0 JUMLAH = 0 T.59

1 782 Six twin line conductors ACSR 429/57 mm2 (Zebra) 202 BT 002 S 015 Mtr 67,969 110,328 0 0 110,328 7,498,883,832 110,328 7,498,883,832 0 0 229.AM-6/131/PIKITRING PT. Kembar Abadi -2 783 One earth conductor, GSW 55 mm2 202 BT 002 O 004 Mtr 27,455 4,597 0 0 4,597 126,210,635 4,597 126,210,635 0 0 JBN/09 PT. Intan Mufakat Raya3 784 One earth conductor, OPGW 70 mm2, 12 cores, complet 202 BT 002 O 005 Mtr 54,054 4,597 0 0 4,597 248,486,238 4,597 248,486,238 0 0 " (R. Kasumba - U. Berung)

with joint boxes, fixing device, fixing clamps and necessary accessories.

SUB JUMLAH 7,873,580,705 7,873,580,705 0 JUMLAH = 7,873,580,705 T.60

Page 29: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 15 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 785 Six twin line conductor ACSR 429/57 mm2 (zebra) 202 BT 002 S 020 Mtr 75,527 384,000 0 70,000 314,000 23,715,478,000 314,000 23,715,478,000 0 0 192.AM-5/131/PIKIT JBN/09 PT. Mega Eltra2 786 Six twin line conductor ACSR 429/57 mm2 (zebra) - 202 BT 002 S 021 Mtr 75,527 47,640 0 0 47,640 3,598,106,280 47,640 3,598,106,280 0 0 " (Mandirancan - Cikijing)

Supply only **) 3 787 One earth conductor, GSW 55 mm2 202 BT 002 O 007 Mtr 10,307 32,000 0 8,000 24,000 247,368,000 24,000 247,368,000 0 0 "4 788 One earthwire conductor OPGW 70 mm2 12 cores, 202 BT 002 O 008 Mtr 54,610 32,000 0 0 32,000 1,747,520,000 32,000 1,747,520,000 0 0 "

complete with joint boxes fixing device, fixing clamps + necessary accessories

5 789 Type AA6 + 6 Tower 202 BT 002 T 071 Unit 151,141,151 1 0 0 1 151,141,151 1 151,141,151 0 0 "6 790 Type CC6 + 0 Tower (Standard Height) 202 BT 002 T 072 Unit 223,657,675 1 0 0 1 223,657,675 1 223,657,675 0 0 "7 791 Type DD6 + 6 Tower 202 BT 002 T 073 Unit 362,536,692 1 0 0 1 362,536,692 1 362,536,692 0 0 "8 792 Type DDR6 + 3 Tower 202 BT 002 T 074 Unit 335,239,893 1 0 0 1 335,239,893 1 335,239,893 0 0 "9 793 Danger plate with fixing facilities 202 BT 002 D 020 Sets 644,895 4 0 0 4 2,579,580 4 2,579,580 0 0 "10 794 Number plate & phase plate with fixing facilities 202 BT 002 N 009 Sets 644,895 4 0 0 4 2,579,580 4 2,579,580 0 0 "11 795 Anti clambing guards 202 BT 002 A 005 Sets 1,516,373 4 0 0 4 6,065,492 4 6,065,492 0 0 "

SUB JUMLAH 30,392,272,343 30,392,272,343 0 JUMLAH = 30,392,272,343 T.61

1 796 Six twin line cond. ACSR 429/56 mm2 (upper circuits) 202 BT 002 S 059 Mtr 83,875 0 0 0 0 0 0 0 0 0 251.AM-7/131/PIKIT JBN/09 PT. Tehate Putra Tunggal2 797 Six twin line cond. TACSR 520/67 mm2 (lower circuits) 202 BT 002 S 060 Mtr 131,542 0 0 0 0 0 0 0 0 0 " PLTU II JABAR - Cibadak3 798 Six twin line conductors TACSR 520/67 mm2 202 BT 002 S 061 Mtr 134,292 0 0 0 0 0 0 0 0 0 " Baru - Lembur Situ4 799 One earthwire conductor AS 70 mm2 202 BT 002 O 022 Mtr 8,580 0 0 0 0 0 0 0 0 0 " TUG 9 : 41/GD/BP/XII/20105 800 One earthwire conductor OPGW 70 mm2 12 cores, 202 BT 002 O 023 Mtr 41,690 0 0 0 0 0 0 0 0 0 " TUG 9 : 42/GD/BP/XII/2010

complete with joint boxes, fixing device, fixing clampsand necessary accessories

6 801 Set of three twin ACSR 429/56 mm2 downleads to subs - 202 BT 002 S 062 Sets 38,995,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 42/GD/BP/XII/2010tation gantry, excluding low duty inverse insulator sets 120 KN (upper circuits)

7 802 Supply Set of three twin TACSR 520/67 mm2 downleads 202 BT 002 S 063 Sets 47,465,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 43/GD/BP/XII/2010to substation gantry, excluding low duty inverse insulator sets 120 KN (lower circuits)

8 803 Set of single AS 70 mm2 earthwire conductor to subs - 202 BT 002 S 064 Sets 3,575,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 43/GD/BP/XII/2010tation gantry and low level gantry including all fittings

9 804 Set of single OPGW 70 mm2 earthwire conductor to 202 BT 002 S 065 Sets 6,143,500 0 0 0 0 0 0 0 0 0 " TUG 9 : 44/GD/BP/XII/2010substation gantry and low level gantry including all fittings

10 805 Armour rod for line cond. ACSR 429/56 mm2 (upper circuit 202 BT 002 A 027 Sets 390,500 0 0 0 0 0 0 0 0 0 " TUG 9 : 44/GD/BP/XII/201011 806 Armour rod for line cond.TACSR 520/67 mm2 (lower circuit202 BT 002 A 028 Sets 1,952,500 0 0 0 0 0 0 0 0 0 " TUG 9 : 45/GD/BP/XII/201012 807 Armour rod for earthwire conductor AS 70 mm2 202 BT 002 A 029 Sets 210,100 0 0 0 0 0 0 0 0 0 " TUG 9 : 45/GD/BP/XII/201013 808 Armour rod for earthwire conductor OPGW 70 mm2 202 BT 002 A 030 Sets 422,400 0 0 0 0 0 0 0 0 0 " TUG 9 : 45/GD/BP/XII/201014 809 FO cable armoured, 12 cores, approx. 200 m per-set 202 BT 002 F 006 Sets 3,355,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 46/GD/BP/XII/201015 810 Gantry Joint Box (GB) 202 BT 002 G 021 Sets 2,788,500 0 0 0 0 0 0 0 0 0 " TUG 9 : 46/GD/BP/XII/201016 811 Optical Terminal Box (OTB) 202 BT 002 O 024 Sets 2,794,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 46/GD/BP/XII/201017 812 Line cond. Vib. damper for ACSR 429/56 mm2 (upper circ) 202 BT 002 L 043 Sets 462,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 47/GD/BP/XII/201018 813 Line conductor vibration damper for ACSR 429/56 mm2 202 BT 002 L 044 Sets 451,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 47/GD/BP/XII/201019 814 Line cond. vib. damper for TACSR 520/67 mm2 (lower circ 202 BT 002 L 045 Sets 682,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 47/GD/BP/XII/201020 815 Line cond. spacer 400 mm for ACSR 429/56mm2 (upper) 202 BT 002 L 046 Sets 352,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 48/GD/BP/XII/201021 816 Line conductor spacer 400 mm for ACSR 429/56mm2 202 BT 002 L 047 Sets 341,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 48/GD/BP/XII/201022 817 Line cond. spacer 400 mm for TACSR 520/67mm2 (lower) 202 BT 002 L 048 Sets 462,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 48/GD/BP/XII/2010

SUB JUMLAH A 0 0 0 T.62

Page 30: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 16 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

SUB JUMLAH A 0 0 0 251.AM-7/131/PIKIT JBN/09 PT. Tehate Putra Tunggal23 818 Line cond. spacer 200 mm for ACSR 429/56 mm2 (upper) 202 BT 002 L 049 Sets 308,000 0 0 0 0 0 0 0 0 0 " PLTU II JABAR - Cibadak24 819 Line conductor spacer 200 mm for ACSR 429/56 mm2 202 BT 002 L 050 Sets 297,000 0 0 0 0 0 0 0 0 0 " Baru - Lembur Situ25 820 Line cond. spacer 200 mm for TACSR 520/67 mm2 (lower 202 BT 002 L 051 Sets 407,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 49/GD/BP/XII/201026 821 Earthwire conductor vibration damper for AS 70 mm2 202 BT 002 E 026 Sets 341,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 22/GD/BP/X/201027 822 Earthwire conductor vibration damper for AS 70 mm2 202 BT 002 E 027 Sets 330,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 50/GD/BP/XII/201028 823 Earthwire conductor vibration damper for OPGW 70 mm2 202 BT 002 E 028 Sets 396,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 23/GD/BP/X/201029 824 Earthwire conductor vibration damper for OPGW 70 mm2 202 BT 002 E 029 Sets 385,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 50/GD/BP/XII/201030 825 Double suspension string set 120 kN min. 4,250 mm 202 BT 002 D 025 Sets 4,917,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 50/GD/BP/XII/2010

creepage distance31 826 Double suspension string set 120 kN min. 5,270 mm 202 BT 002 D 026 Sets 6,545,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 23/GD/BP/X/2010

creepage distance32 827 Single tension string set 210 kN min. 4,250 mm creepage 202 BT 002 S 069 Sets 7,645,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 51/GD/BP/XII/2010

distance33 828 Single tension string set 210 kN min. 5,270 mm creepage 202 BT 002 S 070 Sets 10,065,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 51/GD/BP/XII/2010

distance34 829 Double tension string set 210 kN min. 4,250 mm creepage 202 BT 002 D 027 Sets 14,960,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 51/GD/BP/XII/2010

distance35 830 Double tension string set 210 kN min. 5,270 mm creepage 202 BT 002 D 028 Sets 20,570,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 52/GD/BP/XII/2010

distance36 831 Single suspension jumper insulator string set 120 kN min. 202 BT 002 S 071 Sets 4,917,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 52/GD/BP/XII/2010

4,250 mm creepage distance37 832 Single suspension jumper insulator string set 120 kN min. 202 BT 002 S 066 Sets 6,545,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 53/GD/BP/XII/2010

5,270 mm creepage distance38 833 Single tension inverse insulator string set 120 kN min. 202 BT 002 S 067 Sets 7,645,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 53/GD/BP/XII/2010

4,250 mm creepage distance39 834 Single tension inverse insulator string set 210 kN min. 202 BT 002 S 068 Sets 10,065,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 54/GD/BP/XII/2010

5,270 mm creepage distance40 835 Earthwire suspension clamps for AS 70 mm2 202 BT 002 E 022 Sets 550,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 54/GD/BP/XII/201041 836 Earthwire tension clamps for AS 70 mm2 202 BT 002 E 023 Sets 660,000 0 0 0 0 0 0 0 0 0 " TUG 9 : 54/GD/BP/XII/201042 837 Earthwire suspension clamps for OPGW 70 mm2 202 BT 002 E 024 Sets 1,369,500 0 0 0 0 0 0 0 0 0 " TUG 9 : 55/GD/BP/XII/201043 838 Earthwire tension clamps for OPGW 70 mm2 202 BT 002 E 025 Sets 2,029,500 0 0 0 0 0 0 0 0 0 " TUG 9 : 55/GD/BP/XII/201044 839 Type 4AA611 ± 0 Tower (Standard Height) 202 BT 002 T 089 Sets 326,409,050 0 0 0 0 0 0 0 0 0 " TUG 9 : 26/GD/BP/X/201045 840 Type 4AA611 + 6 Tower 202 BT 002 T 090 Sets 463,718,640 0 0 0 0 0 0 0 0 0 "46 841 Type 4BB611 ± 0 Tower (Standard Height) 202 BT 002 T 091 Sets 583,003,056 0 0 0 0 0 0 0 0 0 " TUG 9 : 27/GD/BP/X/201047 842 Type 4BB611 + 12 Tower 202 BT 002 T 092 Sets 790,780,320 0 0 0 0 0 0 0 0 0 " TUG 9 : 21/GD/BP/X/201048 843 Type 4CC611 ± 0 Tower (Standard Height) 202 BT 002 T 093 Sets 646,462,997 0 0 0 0 0 0 0 0 0 " TUG 9 : 21/GD/BP/X/201049 844 Type 4DDR611 ± 0 Tower (Standard Height) 202 BT 002 T 094 Sets 1,202,095,732 0 0 0 0 0 0 0 0 0 " TUG 9 : 28/GD/BP/XI/201050 845 Type BB11 + 6 Tower 202 BT 002 T 095 Sets 350,993,280 0 0 0 0 0 0 0 0 0 " TUG 9 : 21/GD/BP/X/201051 846 Type DD6 + 6 Tower 202 BT 002 T 096 Sets 435,425,760 1 0 0 1 435,425,760 1 435,425,760 0 0 "52 847 Type 4DD611S - 6 Tower 202 BT 002 T 097 Sets 1,454,555,520 0 0 0 0 0 0 0 0 0 " TUG 9 : 14/GD/BP/IX/201053 848 Type 4DD611S ± 0 Tower (Standard Height) 202 BT 002 T 098 Sets 1,740,635,820 0 0 0 0 0 0 0 0 0 " TUG 9 : 22/GD/BP/X/201054 849 Danger Plate with fixing facilities (2 sets per tower) 202 BT 002 D 024 Sets 121,000 1 0 0 1 121,000 1 121,000 0 0 "55 850 Number Plate & Phase Plate with fixing facilities 202 BT 002 N 022 Sets 181,500 1 0 0 1 181,500 1 181,500 0 0 "

(2 sets per tower)56 851 Anti climbing guards (4 sets per tower) 202 BT 002 A 031 Sets 346,500 1 0 0 1 346,500 1 346,500 0 0 "57 852 Counter Weight 202 BT 002 C 008 Kg 21,780 0 0 0 0 0 0 0 0 0 " TUG 9 : 55/GD/BP/XII/2010

SUB JUMLAH B 436,074,760 436,074,760 0 T.62

JUMLAH = 436,074,760

Page 31: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 17 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 853 Set of single GSW 55 mm2 earth conductors to substation 202 BT 002 S 024 Sets 6,868,594 1 0 0 1 6,868,594 1 6,868,594 0 0 192.AM-5/131/PIKIT JBN/09 PT. Mega Eltragantry including all fittings (Mandirancan - Cikijing)

2 854 Set of single OPGW 70 mm2 earth conductors to subs - 202 BT 002 S 025 Sets 29,433,196 1 0 0 1 29,433,196 1 29,433,196 0 0 "tation gantry including all fittings

3 855 Set of Gantry Boxes (GB) complete, installed on subs - 202 BT 002 S 006 Sets 8,256,257 1 0 0 1 8,256,257 1 8,256,257 0 0 "tation gantry

4 856 Fiber optic Armourod (FA) cable, 4 cores, to connecting 202 BT 002 F 002 Sets 21,971,996 1 0 0 1 21,971,996 1 21,971,996 0 0 "OPGW (GB) + OTB in telcom. room / substation building, approx. 400 m per-set

5 857 Optic terminal boxes (OTB) installed to termination FA 202 BT 002 O 009 Sets 3,581,108 1 0 0 1 3,581,108 1 3,581,108 0 0 "cable at Telecommunication room Fiber optic Armourod (FA) cable

6 858 Armour Rod for conductor 202 BT 002 A 009 Sets 372,820 888 0 0 888 331,064,160 888 331,064,160 0 0 "7 859 Armour Rod for earthwire GSW 55 mm2 202 BT 002 A 010 Sets 60,393 148 0 0 148 8,938,164 148 8,938,164 0 0 "8 860 Armour Rod for earthwire OPGW 70 mm2 202 BT 002 A 015 Sets 333,366 148 0 0 148 49,338,168 148 49,338,168 0 0 "9 861 Line conductor vibration dampers 202 BT 002 L 028 Sets 285,582 1,296 0 0 1,296 370,114,272 1,296 370,114,272 0 0 "10 862 Earth conductor vibration dampers for GSW 55 mm2 202 BT 002 E 012 Sets 223,702 214 0 0 214 47,872,228 214 47,872,228 0 0 "11 863 Earth conductor vibration dampers for OPGW 70 mm2 202 BT 002 E 013 Sets 274,375 214 0 0 214 58,716,250 214 58,716,250 0 0 "12 864 Line conductor spacers (span) 400 mm 202 BT 002 L 029 Sets 164,594 3,240 0 0 3,240 533,284,560 3,240 533,284,560 0 0 "13 865 Line conductor spacers (jumper) 200 mm 202 BT 002 L 030 Sets 151,613 306 0 0 306 46,393,578 306 46,393,578 0 0 "14 866 Suspens. Set double string (120 KN Normal Type/Type A) 202 BT 002 S 027 Sets 6,076,409 444 0 342 102 619,793,718 102 619,793,718 0 0 "15 867 Tension set double string (210 KN Normal Type / Type B) 202 BT 002 T 070 Sets 10,504,152 365 0 0 365 3,834,015,480 365 3,834,015,480 0 0 "16 868 Inverse Double string (210 KN Normal Type / Type A) 202 BT 002 I 002 Sets 9,831,786 12 0 0 12 117,981,432 12 117,981,432 0 0 "17 869 Jumper suspension set single string (120 KN Normal Type/202 BT 002 J 003 Sets 2,941,729 66 0 0 66 194,154,114 66 194,154,114 0 0 "

Type A)18 870 Ground wire suspension set for GSW 55 mm2 202 BT 002 G 007 Sets 564,611 74 0 0 74 41,781,214 74 41,781,214 0 0 "19 871 Ground wire suspension set for OPGW 70 mm2 202 BT 002 G 008 Sets 564,611 74 0 0 74 41,781,214 74 41,781,214 0 0 "20 872 Ground wire tension set for GSW 55 mm2 202 BT 002 G 009 Sets 434,171 112 0 0 112 48,627,152 112 48,627,152 0 0 "21 873 Ground wire tension set for OPGW 70 mm2 202 BT 002 G 010 Sets 1,618,720 112 0 0 112 181,296,640 112 181,296,640 0 0 "

SUB JUMLAH 6,595,263,495 6,595,263,495 0 T.63

JUMLAH = 6,595,263,495 1 874 Set of three ACSR 429/57 mm2 (Zebra) downleads to 202 BT 002 S 022 Sets 36,817,809 2 0 0 2 73,635,618 2 73,635,618 0 0 192.AM-5/131/PIKIT JBN/09 PT. Mega Eltra

substantion gantry (including low duty inverse insulator (Mandirancan - Cikijing)sets/120 KN-Normal Type)

SUB JUMLAH 73,635,618 73,635,618 0 JUMLAH = 73,635,618 T.63

Page 32: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 18 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 875 Set of single GSW 95 mm2 earth conductors to 202 BT 002 S 056 Sets 4,235,500 2 0 0 2 8,471,000 2 8,471,000 0 0 210.AM-5/131/PIKIT JBN/09 Konsorsium PT. Altasia substation gantry including all fitting Utama - PT. Prima Estika

(Uber Incomer)

SUB JUMLAH 8,471,000 8,471,000 0 JUMLAH = 8,471,000 T.58

1 876 Kabel OPGW 12 cores 70 mm 202 BT 002 K 001 Mtr 80,376 37,000 0 0 37,000 2,973,912,000 37,000 2,973,912,000 0 0 056.PJ/131/PIKIT JBN/10 Beverint Surya Sejati

SUB JUMLAH 2,973,912,000 2,973,912,000 0 JUMLAH = 2,973,912,000 T.64

1 877 Set of three twin ACSR 429/57 mm2 (Zebra) downleads 202 BT 002 S 074 Sets 33,009,632 2 0 0 2 66,019,264 2 66,019,264 0 0 230.AM-6/131/PIKIT JBN/09 Beverint Mekadayato substation gantry (including low duty inverse insulator Konsorsiumsets /120 KN-Normal Type) (Kiaracondong II Incomer)

2 878 Set of single GSW 55 mm2 earth conductors to subs - 202 BT 002 S 075 Sets 6,419,169 1 0 0 1 6,419,169 1 6,419,169 0 0 tation gantry including all fitting

3 879 Armour Rod for earthwire OPGW 70 mm2 202 BT 002 A 033 Sets 403,550 4 0 0 4 1,614,200 4 1,614,200 0 0

SUB JUMLAH 74,052,633 74,052,633 0 JUMLAH = 74,052,633 T.57

1 880 Armour Rod for earthwire OPGW 70 mm2 202 BT 002 A 032 Sets 116,325 4 0 0 4 465,300 4 465,300 0 0 228.AM-6/131/PIKIT JBN/09 Hasta Surya Nusantara(Cikedung Incomer)

SUB JUMLAH 465,300 465,300 0 JUMLAH = 465,300 T.55

1 881 Set of three quadruple ACSR 282/46 mm2 (Dove) down- 202 BT 002 S 072 Sets 30,184,000 2 0 0 2 60,368,000 2 60,368,000 0 0 210.AM-5/131/PIKIT JBN/09 Altasia - Primaleads to substation gantry (excluding low duty insulator (Ujung Berung Incomer)set 160 KN-Normal type)

2 882 Set of single OPGW 100 mm2 earth conductors to subs- 202 BT 002 S 073 Sets 8,800,000 2 0 0 2 17,600,000 2 17,600,000 0 0 tation gantry including all fittings

SUB JUMLAH 77,968,000 77,968,000 0 JUMLAH = 77,968,000 T.58

Page 33: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 19 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 883 Set of three twin ACSR 429/57 mm2 (Zebra) downleads 202 BT 002 S 076 Sets 104,455,672 1 0 0 1 104,455,672 1 104,455,672 0 0 229.AM-6/131/PIKIT JBN/09 Kembar Abadi -to substation gantry (including low duty inverse insulator Intan Mufakat Rayasets /120 KN-Normal Type)

2 884 Set of single GSW 55 mm2 earth conductor to subs - 202 BT 002 S 077 Sets 27,232,620 1 0 0 1 27,232,620 1 27,232,620 0 0 " tation gantry including all fittings

3 885 Set of single OPGW 70 mm2 earth conductors to subs- 202 BT 002 S 078 Sets 31,716,781 1 0 0 1 31,716,781 1 31,716,781 0 0 " tation gantry including all fittings

4 886 Set of Gantry Boxes(GB) complete,instal on subs gantry 202 BT 002 S 079 Sets 9,170,152 1 0 0 1 9,170,152 1 9,170,152 0 0 " 5 887 Fiber optic Armourod (FA) cable, 4 cores, to connection 202 BT 002 F 007 Sets 19,104,472 1 0 0 1 19,104,472 1 19,104,472 0 0 "

OPGW (GB) and OTB in telcom. room/substation building approx 400 m per-set

6 888 Optic Terminal Boxes (OTB) installed to termination FA 202 BT 002 O 025 Sets 1,656,448 1 0 0 1 1,656,448 1 1,656,448 0 0 " cable at Telcom room Fiber optic Armourod (FA) cable

7 889 Line conductor vibration dampers 202 BT 002 L 052 Sets 288,870 648 0 0 648 187,187,760 648 187,187,760 0 0 " 8 890 Earth conductor vibration dampers for GSW 55 mm2 202 BT 002 E 030 Sets 138,379 28 0 0 28 3,874,612 28 3,874,612 0 0 " 9 891 Earth conductor vibration dampers for OPGW 70 mm2 202 BT 002 E 031 Sets 215,701 28 0 0 28 6,039,628 28 6,039,628 0 0 " 10 892 Line conductor spacers (span) 400 mm 202 BT 002 L 053 Sets 124,830 936 0 0 936 116,840,880 936 116,840,880 0 0 " 11 893 Line conductor spacers (jumper) 200 mm 202 BT 002 L 054 Sets 182,128 312 0 0 312 56,823,936 312 56,823,936 0 0 " 12 894 Tension set double string (210 KN Normal Type/Type B) 202 BT 002 T 099 Sets 8,791,057 300 0 0 300 2,637,317,100 300 2,637,317,100 0 0 " 13 895 Inverse Doublee string (210 KN Normal Type / Type A) 202 BT 002 I 005 Sets 5,851,377 24 0 0 24 140,433,048 24 140,433,048 0 0 " 14 896 Jumper susp single string (120 KN Normal Type/Type A) 202 BT 002 J 008 Sets 1,391,628 18 0 0 18 25,049,304 18 25,049,304 0 0 " 15 897 Ground wire tension set for GSW 55 mm2 202 BT 002 G 022 Sets 376,503 28 0 0 28 10,542,084 28 10,542,084 0 0 " 16 898 Ground wire tension set for OPGW 70 mm2 202 BT 002 G 023 Sets 1,306,448 28 0 0 28 36,580,544 28 36,580,544 0 0 " 17 899 Type 4BB6 ± 0 Tower (Standard Height) 202 BT 002 T 100 Unit 526,929,014 1 0 0 1 526,929,014 1 526,929,014 0 0 " 18 900 Type 4CC6 + 3 202 BT 002 T 101 Unit 622,599,412 1 0 0 1 622,599,412 1 622,599,412 0 0 " 19 901 Type 4DD6 + 6 202 BT 002 T 102 Unit 1,207,333,455 1 0 0 1 1,207,333,455 1 1,207,333,455 0 0 " 20 902 Danger Plate with fixing facilities 202 BT 002 D 029 Sets 529,718 3 0 0 3 1,589,154 3 1,589,154 0 0 " 21 903 Number Plate & Phase Plate with fixing facilities 202 BT 002 N 023 Sets 639,718 3 0 0 3 1,919,154 3 1,919,154 0 0 " 22 904 Anti climbing guards 202 BT 002 A 034 Sets 529,718 3 0 0 3 1,589,154 3 1,589,154 0 0 "

SUB JUMLAH 5,775,984,384 5,775,984,384 0 JUMLAH = 5,775,984,384 T.58

Page 34: September 11

PJJB/FML/8-75

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL PDPTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 20 - 20

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSKKE SISA NILAI PENCADANGAN SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL LUAR AKHIR (Rupiah) JUMLAH (Rp) JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 905 Double tension string set with insulator 202 BT 002 D 002 Sets 10,272,000 0 220 0 220 2,259,840,000 220 2,259,840,000 0 0 112.AM-1/131/PIKIT JBN/10 Beverint Surya Sejati2 906 Vibration damper 202 BT 002 V 006 Pcs 535,106 0 100 0 100 53,510,600 100 53,510,600 0 0 Patuha - Lagadar3 907 Line spacer 400 mm 202 BT 002 L 055 Pcs 261,331 0 2,960 0 2,960 773,539,760 2,960 773,539,760 0 0 4 908 Set of tension clamp complete 202 BT 002 S 080 Sets 5,319,000 0 22 0 22 117,018,000 22 117,018,000 0 0 5 909 Kabel FA 12 core 202 BT 002 K 030 Mtr 49,500 0 500 0 500 24,750,000 500 24,750,000 0 0 6 910 Accessories suspension lengkap (OPGW) 202 BT 002 A 035 Sets 2,046,000 0 59 0 59 120,714,000 59 120,714,000 0 0 7 911 Accessories tension lengkap (OPGW) 202 BT 002 A 036 Sets 1,905,750 0 124 0 124 236,313,000 124 236,313,000 0 0 8 912 Joint box (OPGW) 202 BT 002 J 009 Unit 11,220,000 0 9 0 9 100,980,000 9 100,980,000 0 0 9 913 Vibration damper (OPGW) 202 BT 002 V 007 Pcs 434,165 0 242 0 242 105,067,930 242 105,067,930 0 0 10 914 MUX 2 Mbps 202 BT 002 M 006 Unit 141,817,500 0 2 0 2 283,635,000 2 283,635,000 0 0 11 915 Material pendukung 202 BT 002 M 007 Ls 39,599,458 0 1 0 1 39,599,458 1 39,599,458 0 0

SUB JUMLAH 4,114,967,748 0 JUMLAH = 4,114,967,748

TOTAL TR 108,983,726,289

Page 35: September 11

PJJB/FML/8-75

1 877 202 BT 002 S 074 Set of th Sets 2 230.AM-6/131/PIKIT JBN/2009 ###PT. Beverint Mekadaya (including low duty inverse insulator sets /120 KN-Normal Type)

2 878 202 BT 002 S 075 Set of sin Sets 1 " ### all fitting

3 879 202 BT 002 A 033 Armour Ro Sets 4 " ###

1 880 202 BT 002 A 032 Armour Ro Sets 4 228.AM-6/131/PIKIT JBN/2009 465,300 Hasta Surya Nusantara

1 881 202 BT 002 S 072 Set of th Sets 2 210.AM-5/131/PIKIT JBN/2009 ###Altasia - Prima Estika gantry (excluding low duty insulator set 160 KN-Normal type)

2 882 202 BT 002 S 073 Set of sin Sets 2 " ### ding all fittings

Page 36: September 11

PJJB/FML/8-75

1 883 202 BT 002 S 076 Set of th Sets 1 229.AM-6/131/PIKIT JBN/2009 ### Kembar Abadi - (including low duty inverse insulator sets /120 KN-NormIntan Mufakat Raya

2 884 202 BT 002 S 077 Set of sin Sets 1 " ### all fittings

3 885 202 BT 002 S 078 Set of sin Sets 1 " ### all fittings.

4 886 202 BT 002 S 079 Set of Gan Sets 1 " ###5 887 202 BT 002 F 007 Fiber opt Sets 1 " ###

OTB in telcom. room/substation building approx 400 m per-set

6 888 202 BT 002 D 025 Optic Term Sets 1 " ### room Fiber optic Armourod (FA) cable

7 889 202 BT 002 L 052 Line condu Sets 648 " ###8 890 202 BT 002 E 030 Earth con Sets 28 " ###9 891 202 BT 002 E 031 Earth con Sets 28 " ###

10 892 202 BT 002 L 053 Line cond Sets 936 " ###11 893 202 BT 002 L 054 Line cond Sets 312 " ###12 894 202 BT 002 T 099 Tension s Sets 300 " ###13 895 202 BT 002 I 005 Inverse D Sets 24 " ###14 896 202 BT 002 J 008 Jumper su Sets 18 " ###15 897 202 BT 002 G 022 Ground wi Sets 28 " ###16 898 202 BT 002 G 023 Ground wi Sets 28 " ###17 899 202 BT 002 T 100 Type 4BB6 Unit 1 " ###18 900 202 BT 002 T 101 Type 4CC6 Unit 1 " ###19 901 202 BT 002 T 102 Type 4DD6 Unit 1 " ###20 902 202 BT 002 D 029 Danger Plat Sets 3 " ###21 903 202 BT 002 N 023 Number Pla Sets 3 " ###22 904 202 BT 002 A 034 Anti climb Sets 3 " ###

Page 37: September 11

PJJB/FML/8-76

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAPORAN PERSEDIAAN MATERIAL

A T T B SEPTEMBER 2011

Page 38: September 11

PJJB/FML/8-77

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

REKAPITULASI NILAI MATERIAL ATTB UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

BULAN : SEPTEMBER 2011

No/ NOMOR KONTRAK MATERIAL GARDU INDUK MATERIAL TRANSMISI JUMLAHHal PENCADANGAN SISA BEBAS PENCADANGAN SISA BEBAS1 2 3 4 5 6 7

1 100/PST/87 - 36,883,623 - - 36,883,623PJP.013/PST/88 - - - 30,672,939 30,672,939PJP.022/PST/88 - - - 6,110,400 6,110,400PJP.021/PST/88 - 80,341,219 - - 80,341,219

2 PJP.039/PST/88 - - - 97,760,713 97,760,713084.PJ/9220/90/M. - 126,398,852 - - 126,398,85203.PJ/9220/92/M. - - - 15,900,000 15,900,000PJ.068/PST/74 - 2,480,772 - - 2,480,772

3 079.A.PJ/9220/94/M. - 749,096,200 - - 749,096,200027.PJ/9220/93/M. - - - 61,418,425 61,418,425105.PJ/9220/97/M. - 283,446,983 - - 283,446,983PJP.089/PST/78 - - - 10,500 10,500PJ.020/PST/88 - 19,808,870 - - 19,808,870SPK.379/9220/91/M. - 291,500 - - 291,500

4 SPK.02/921/92/M. - 3,350,000 - - 3,350,000SPK.011.PJ/9220/91/M. - 3,924,650 - - 3,924,650122.PJ/9220/93/M. - - - 5,723,453 5,723,453104.B.PJ/9220/94/M. - - - 828,200 828,200105.C.PJ/9220/94/M - - - 611,424,132 611,424,132099.PJ/9220/94/M. - 510,346,100 - - 510,346,100036.PJ/9220/94/M. - - - 170,073,750 170,073,750020.PJ/9220/95/M. - - - 53,567,384 53,567,384

5 PJP.003/PST/88 - 425,750 - - 425,750124.PJ/9220/95/M - - - 47,233,530 47,233,530119.PJ/9220/95/M - - - 57,870,000 57,870,000064.PJ/9220/97/M. - 701,300 - - 701,300PJ.081/PST/78 - - - 13,501,039 13,501,039

JUMLAH 0 1,817,495,819 0 1,172,094,465 2,989,590,284

JUMLAH TOTAL PENCADANGAN = - SISA BEBAS = 2,989,590,284 (GI + TRANSMISI) (GI + TRANSMISI)

JUMLAH TOTAL GARDU INDUK = 1,817,495,819 TRANSMISI = 1,172,094,465 2,989,590,284 (PENC+S. BEBAS) (PENC+S. BEBAS)

= Material Mutasi

= Material Habis

Bandung, 30 September 2011

MANAGER UPKJJB REGION IV KOORDINATOR LOGISTIK

Ir. SYAIFOEL ARIEF YAYUS RUSYADI SASTRA

Page 39: September 11

PJJB/FML/8-78

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

DAFTAR PEMANFAATAN MATERIAL ATTB OLEH UNIT SENDIRIUNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

No. No. KODE NAMA BARANG / SPARE PART ASAL MATERIAL SAT VOL TANGGAL NO LOKASI RUPIAH KETERANGANUrt. KARTU BARANG NOMOR KONTRAK T U G 9 T U G 9 PENGGUNAAN GARDU INDUK TRANSMISI JUMLAH

SEPTEMBER 2011

N I H I L 0 0 0

0 0 0

TOTAL BULAN SEPTEMBER 2011 0

Bandung, 30 September 2011

MANAGER UPKJJB REGION IV KOORDINATOR LOGISTIK

Ir. SYAIFOEL ARIEF YAYUS RUSYADI SASTRA

Page 40: September 11

PJJB/FML/8-79

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

DAFTAR PEMANFAATAN MATERIAL ATTB OLEH UNIT LAINUNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

No. No. KODE NAMA BARANG / SPARE PART ASAL MATERIAL SAT VOL TANGGAL NO LOKASI RUPIAH KETERANGANUrt. KARTU BARANG NOMOR KONTRAK T U G 8 T U G 8 PENGGUNAAN GARDU INDUK TRANSMISI JUMLAH

SEPTEMBER 2011

N I H I L 0 0 0

0 0 0

TOTAL BULAN SEPTEMBER 2011 0

Bandung, 30 September 2011

MANAGER UPKJJB REGION IV KOORDINATOR LOGISTIK

Ir. SYAIFOEL ARIEF YAYUS RUSYADI SASTRA

Page 41: September 11

PJJB/FML/8-79

MAYARUDIN

Page 42: September 11

PJJB/FML/8-80 MATERIAL ATTB 42/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAMPIRAN USULAN PENARIKAN AKTIVA BULAN : SEPTEMBER 2011

HALAMAN 1 - 5NO NO NAMA BARANG KODE SAT HARGA STOCK

MASUK KELUARSTOCK HARGA NOMOR

KETERANGANURUT KARTU AKUN SATUAN (Rp.) AWAL AKHIR PEROLEHAN (Rp.) KONTRAK1 2 3 4 5 6 7 8 9 10 11 12 13

1 197 Spare Parts for Transformer 49201 Set 36,883,623 1 0 0 1 36,883,623 100/PST/87

JUMLAH 36,883,623 2 46 150 KV Single Tension for ACSR ST1 Dove 49202 Set 57,763 82 0 0 82 4,736,566 PJP.013/PST/88 TUG 8 : 03/GD/BPBS/III/10

3 49 Stock Bridge Damper STB 2 for ACSR Skunk 49202 Bh 11,407 38 0 0 38 433,466 "4 50 Joint Tension Sleve JX AC 7x3,17 49202 Bh 7,177 210 0 0 210 1,507,170 "5 51 Joint Tension Sleve JX Skunk 49202 Bh 9,102 41 0 0 41 373,182 "6 53 Jumper Support Insulator REF 8A 35004 Z 70 KV 49202 Bh 429,501 55 0 0 55 23,622,555 "

JUMLAH 30,672,939 7 59 ACSR Skunk ukuran 63/67 mm2 49202 M 0 0 0 0 0 0 PJP.022/PST/88 TUG 8 : 02/GD/BPBS/VII/08

8 60 ACSR Skunk ukuran 63/67 sqmm 49202 M 0 0 0 0 0 0 " TUG 8 : 02/GD/BPBS/VII/08

9 62 Galvanized Steel ukuran 1x55 sqmm 49202 M 608 10,050 0 0 10,050 6,110,400 "

JUMLAH 6,110,400 10 231 70 KV Control Panel Set of spare parts 49202 Set 232,625 1 0 0 1 232,625 PJP.021/PST/8811 232 150 KV Control Panel Set of spare parts 49202 Set 186,100 1 0 0 1 186,100 "12 233 48 KV Battery changer Set of spare parts 49202 Set 4,317,520 1 0 0 1 4,317,520 "13 234 110 KV Battery changer Set of spare parts 49202 Set 4,317,520 1 0 0 1 4,317,520 "14 235 150 KV Disconnector 1600 A Set of spare parts 49202 Set 1,972,660 1 0 0 1 1,972,660 "15 236 150 KV Disconnector 1250 A Set of spare parts 49202 Set 1,972,660 1 0 0 1 1,972,660 "16 237 70 KV Disconnector 1250 A Set of spare parts 49202 Set 1,972,660 1 0 0 1 1,972,660 "17 238 70 KV Disconnector 800 A Set of spare parts 49202 Set 1,972,660 1 0 0 1 1,972,660 "18 239 48 KV Battery Cheel 49202 Set 398,254 1 0 0 1 398,254 "19 240 110 V Battery Cheel 49202 Set 1,306,420 1 0 0 1 1,306,420 "20 241 70/20 KV Line Protective Relay Set of spare parts 49202 Set 55,830 1 0 0 1 55,830 "21 242 150/20 KV Line Protective Relay Set of spare parts 49202 Set 55,830 1 0 0 1 55,830 "22 243 70 KV Line Protective Relay Set of spare parts 49202 Set 46,525 1 0 0 1 46,525 "23 244 150 KV Line Protective Relay Set of spare parts 49202 Set 46,525 1 0 0 1 46,525 "24 245 150 KV Disconnector 2000 A Set of spare parts 49202 Set 1,972,660 1 0 0 1 1,972,660 "25 246 70 KV Circuit Breaker 800 A ( Assesories ) 49202 Set 8,290,755 1 0 0 1 8,290,755 "26 247 70 KV Circuit Breaker 1250 A ( Assesories ) 49202 Set 6,217,603 1 0 0 1 6,217,603 "27 248 Spare part 150 KV Circuit Breaker 1250 A 49202 Set 7,769,679 1 0 0 1 7,769,679 "28 249 Spare part 150 KV Circuit Breaker 1600 A 49202 Set 7,769,675 1 0 0 1 7,769,675 "29 250 Spare part 150 KV Circuit Breaker 2000 A 49202 Set 7,769,675 1 0 0 1 7,769,675 "30 252 Alarms Instrument & Control and DC Switch-board 48 VDC. 49202 Set 3,942,950 1 0 0 1 3,942,950 "31 253 Galvanized Stell structure suitable 49202 Set 16,923,661 1 0 0 1 16,923,661 "32 254 Overhead Earth Wire,Conectors Etc 49202 Set 830,772 1 0 0 1 830,772 "

JUMLAH 80,341,219 CATATAN : = MATERIAL MUTASI

= MATERIAL HABIS

Page 43: September 11

PJJB/FML/8-80 MATERIAL ATTB 43/58

Page 44: September 11

PJJB/FML/8-80 MATERIAL ATTB 44/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAMPIRAN USULAN PENARIKAN AKTIVA BULAN : SEPTEMBER 2011

HALAMAN 2 - 5NO NO NAMA BARANG KODE SAT HARGA STOCK

MASUK KELUARSTOCK HARGA NOMOR

KETERANGANURUT KARTU AKUN SATUAN (Rp.) AWAL AKHIR PEROLEHAN (Rp.) KONTRAK1 2 3 4 5 6 7 8 9 10 11 12 13

33 63 Tower type Aa1+9 49202 Set 5,733,412 3 0 0 3 17,200,236 PJP.039/PST/8834 64 Tower type Aa1S+3 49202 Set 9,041,620 1 0 0 1 9,041,620 "35 65 Tower type Aa1S+6 49202 Set 9,438,244 1 0 0 1 9,438,244 "36 66 Tower type Aa4+0 49202 Set 12,357,309 1 0 0 1 12,357,309 "37 69 Stub Angle type DD4 49202 Set 620,778 1 0 0 1 620,778 "38 70 Stub Angle type CC4 49202 Set 768,594 1 0 0 1 768,594 "39 71 Tower type CC4+0 49202 Set 14,691,059 1 0 0 1 14,691,059 "40 72 Tower type CC4+3 49202 Set 13,537,253 1 0 0 1 13,537,253 "41 73 Stub Angle type DDR4 49202 Set 647,233 1 0 0 1 647,233 "42 74 Tower type DDR4+0 49202 Set 19,458,387 1 0 0 1 19,458,387 "

JUMLAH 97,760,713 43 264 Klem CB u/ A1 772 mm2 type T (0421) 49202 Set 126,500 7 0 0 7 885,500 084.PJ/9220/90/M44 265 Klem CB u/ A1 772 mm2 type lurus (0402) 49202 Bh 126,500 5 0 0 5 632,500 "45 266 Klem DS u/ A1 772 mm2 type T (0412) 49202 Bh 126,500 24 0 0 24 3,036,000 "46 267 Klem T 772/240 mm2 (0438) 49202 Bh 126,500 6 0 0 6 759,000 "47 268 Klem CT u/ A1 772 mm2 type lurus (0404-0423) 49202 Bh 126,500 15 0 0 15 1,897,500 "48 269 Klem CT u/ A1 772 mm2 type T (0494) 49202 Bh 126,500 30 0 0 30 3,795,000 "49 270 Klem LA u/ A1 772 mm2 type T (0411) 49202 Set 126,500 9 0 0 9 1,138,500 "50 271 Klem type T (0415) 49202 Bh 137,500 3 0 0 3 412,500 "51 272 Double Busbar Connector (0428) 49202 Bh 506,000 15 0 0 15 7,590,000 "52 273 Marshalling Kiosk (Box) 49202 Set 2,500,000 2 0 0 2 5,000,000 "53 274 Support Arrester type I tinggi 2,3 m/82 kg 49202 Set 359,898 9 0 0 9 3,239,082 "54 275 Support CCVT type II tinggi 1,8 m/90 kg 49202 Set 359,010 12 0 0 12 4,308,120 "55 276 Support DS Line pentanahan type 5/740 kg 49202 Set 3,247,860 4 0 0 4 12,991,440 "56 277 Support CT type III tinggi 2,3 m/86 kg 49202 Set 377,454 15 0 0 15 5,661,810 "57 278 Tiang penangkal petir type C 1010 kg tinggi 18 M 49202 Set 4,432,890 2 0 0 2 8,865,780 "58 279 Tiang serandang type B berat 810 kg tinggi 11 M 49202 Set 3,555,090 6 0 0 6 21,330,540 "59 280 Gelagar panjang 14,6 M type A berat 750 kg 49202 Set 3,291,750 4 0 0 4 13,167,000 "60 281 Dudukan DS Steun Isolator type D 440 kg 49202 Set 1,931,160 8 0 0 8 15,449,280 "61 282 Dudukan Busbar panjang 14,6 M type B 740 kg 49202 Set 3,247,860 5 0 0 5 16,239,300 "

JUMLAH 126,398,852 62 75 Dead and Clamp type revolver u/ Dove 49202 Bh 220,835 48 0 0 48 10,600,080 03.PJ/9220/92/M63 76 Paralel Klem 49202 Bh 110,415 48 0 0 48 5,299,920 "

JUMLAH 15,900,000 64 195 Coper/steel Bar ukuran 80x5 mm panjang @ 5 M 49202 Btg 34,551 20 0 0 20 691,020 PJ.068/PST/7465 196 Kawat ACSR ukuran 187,5 mm2 49202 Drum 74,573 24 0 0 24 1,789,752 " Kurang lebih 2,3 ton

JUMLAH 2,480,772

Page 45: September 11

PJJB/FML/8-80 MATERIAL ATTB 45/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAMPIRAN USULAN PENARIKAN AKTIVA BULAN : SEPTEMBER 2011

HALAMAN 3 - 5NO NO NAMA BARANG KODE SAT HARGA STOCK

MASUK KELUARSTOCK HARGA NOMOR

KETERANGANURUT KARTU AKUN SATUAN (Rp.) AWAL AKHIR PEROLEHAN (Rp.) KONTRAK1 2 3 4 5 6 7 8 9 10 11 12 13

66 103 20 KV Swichgear unit type III 49202 Set 93,480,200 6 0 0 6 560,881,200 079A.PJ/9220/94/M67 105 20 KV Swichgear unit type II 49202 Set 53,350,000 1 0 0 1 53,350,000 "68 106 20 KV Swichgear unit type V 49202 Set 134,865,000 1 0 0 1 134,865,000 "

JUMLAH 749,096,200 69 89 Double Tension String for Conductor (Dove) 49202 Set 1,328,085 34 0 0 34 45,154,890 027.PJ/9220/93/M Tanpa Isolator70 90 Jumper Support Insulator for Conductor (Dove) 49202 Set 863,687 1 0 0 1 863,687 " Tanpa Isolator71 91 Compression Repair Sleeve for Conductor ACSR (Dove) 49202 Set 12,661 2 0 0 2 25,322 "72 92 Compression Midspand Joint for Conductor ACSR (Dove) 49202 Set 25,664 120 0 0 120 3,079,680 "73 93 Jumper Joint for Conductor ACSR Dove 49202 Set 15,333 122 0 0 122 1,870,626 "74 95 Stockbridge Vibration Damper for Conductor ACSR Dove 49202 Set 24,470 426 0 0 426 10,424,220 "

JUMLAH 61,418,425 75 408 Protection cubicle for Transformer 150/13,8 KV 49202 Set 283,446,983 1 0 0 1 283,446,983 105.PJ/9220/97/M

JUMLAH 283,446,983 76 29 Service Set Combiplex 49201 Set 10,500 1 0 0 1 10,500 PJP.089/PST/78

JUMLAH 10,500 77 215 Earthing Switch 49204 Set 653,450 2 0 0 2 1,306,900 PJ.020/PST/88 78 216 Voltage Transformer RTF 300 F + Tepefuse 49204 Set 896,160 2 0 0 2 1,792,320 "79 217 Current Transformer RCF 300.1000-500/5-5A 49202 Set 1,362,910 1 0 0 1 1,362,910 "80 218 Current Transformer RCF 300-400/5-5A 49202 Set 1,123,934 4 0 0 4 4,495,736 "81 219 Current Transformer RCRT 3.1000-500/5-5A type KW3 49202 Set 838,283 1 0 0 1 838,283 "82 220 Closing Trip Coil 110V DC 49202 Set 136,291 8 0 0 8 1,090,328 "83 221 Shunt Trip Coil 110V DC 49202 Set 136,291 8 0 0 8 1,090,328 "84 222 LV Voltage Auxiliary Contacts 49202 Set 181,099 8 0 0 8 1,448,792 "85 223 Heating Resistor for 1 Cubicle 49202 Set 300,587 4 0 0 4 1,202,348 "86 224 Reclosing Relay CGEE TTR 7136 49202 Set 2,557,790 1 0 0 1 2,557,790 "87 225 Frequency Relay CGEE HDG 7020 49202 Set 2,184,390 1 0 0 1 2,184,390 "88 226 Ampere meter 0-800A Crompton 49202 Set 41,074 2 0 0 2 82,148 "89 227 Voltmeter 49202 Set 41,074 3 0 0 3 123,222 "90 228 MCB 2 type 045N. 5A MG 49202 Set 24,271 5 0 0 5 121,355 "91 229 MCB 3 type 045N. 2A MG 49202 Set 37,340 1 0 0 1 37,340 "92 230 Indicator Lamp 49202 Set 3,734 20 0 0 20 74,680 "

JUMLAH 19,808,870 93 285 Kabel Gland ukuran 12 mm 49202 Bh 2,200 100 0 0 100 220,000 SPK.379/9220/91/M94 286 Sepatu Kabel ukuran 2,5 mm 49202 Bh 220 100 0 0 100 22,000 "95 287 Sepatu Kabel ukuran 4 mm 49202 Bh 220 100 0 0 100 22,000 "96 288 Sepatu Kabel ukuran 6 mm 49202 Bh 220 50 0 0 50 11,000 "97 289 Sepatu Kabel ukuran 10 mm 49202 Bh 330 50 0 0 50 16,500 "

JUMLAH 291,500

Page 46: September 11

PJJB/FML/8-80 MATERIAL ATTB 46/58

Page 47: September 11

PJJB/FML/8-80 MATERIAL ATTB 47/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAMPIRAN USULAN PENARIKAN AKTIVA BULAN : SEPTEMBER 2011

HALAMAN 4 - 5NO NO NAMA BARANG KODE SAT HARGA STOCK

MASUK KELUARSTOCK HARGA NOMOR

KETERANGANURUT KARTU AKUN SATUAN (Rp.) AWAL AKHIR PEROLEHAN (Rp.) KONTRAK1 2 3 4 5 6 7 8 9 10 11 12 13

98 346 Klem Grounding CU 120 mm ke structure 49202 Bh 11,800 200 0 0 200 2,360,000 SPK.02/921/92/M99 347 Klem Grounding CU u/120 mm ke 40 x 5 mm 49202 Bh 9,900 100 0 0 100 990,000 "

JUMLAH 3,350,000 100 322 Klem type TEE Connector 120 Sqmm 49202 Bh 16,573 40 0 0 40 662,920 SPK.011.PJ/9220/91/M101 323 Klem type cross connector 120 Sqmm 49202 Bh 16,546 80 0 0 80 1,323,680 "102 324 Klem arde u/ Joint 40 x 5 mm ke 120 mm 49202 Bh 27,305 60 0 0 60 1,638,300 "103 325 Klem grounding CU u/120 mm ke 40 x 5 mm 49202 Bh 29,975 10 0 0 10 299,750 "

JUMLAH 3,924,650 104 96 Midspan Joint for ACSR Ostrich 49202 Bh 138,793 35 0 0 35 4,857,755 122.PJ/9220/93/M105 98 Suspension Set for GSW 55 mm 49202 Bh 144,283 6 0 0 6 865,698 "

JUMLAH 5,723,453 106 113 Isolator Fitting Double Suspension set for 2xdove 49202 Set 828,200 1 0 0 1 828,200 104B.PJ/9220/94/M Tanpa Isolator

JUMLAH 828,200 107 114 150 KV Single Suspension Insulator String for 2 x Zebra 49202 Set 18,115,449 22 0 0 22 398,539,878 105C.PJ/9220/94/M Tanpa Isolator108 115 150 KV Earth Wire Suspension Insulator String for GSW 55 mm 49202 Set 1,144,539 186 0 0 186 212,884,254 " Tanpa Isolator

JUMLAH 611,424,132 109 380 3 Phase ACSR Single Busbar 1250 A. 49202 Set 42,555,700 1 0 0 1 42,555,700 099.PJ/9220/94/M 70 KV110 381 Galvanized Busbar earthwire etc 49202 Set 48,006,200 1 0 0 1 48,006,200 " "111 382 3 Phase Motor operated Bus DS Switch 800a,16KA 49202 Set 28,131,400 1 0 0 1 28,131,400 " "112 383 3 Phase Motor operated fedeer DS Switch 800 A, 16 KA 49202 Set 29,528,400 1 0 0 1 29,528,400 " "113 384 ACSR Conductor, Connector, Insulator, Masshaling, Etc. 49202 Set 16,545,100 1 0 0 1 16,545,100 " "114 385 Over head, Earthwire, Connector, Electrode Etc. 49202 Set 41,583,300 1 0 0 1 41,583,300 " "115 388 Single CCVT 66000 : V3/100 : V3 100 VA. 49202 Bh 25,501,300 3 0 0 3 76,503,900 " "116 389 Protection Cubicle with Distance Protection. 49202 Set 122,138,500 1 0 0 1 122,138,500 " "117 390 Control cubicle for Mimic diagram discrapance switches 49202 Set 83,886,000 1 0 0 1 83,886,000 " "118 391 Small wiring terminal block Link, Fuse, Etc. 49202 Set 21,467,600 1 0 0 1 21,467,600 " "

JUMLAH 510,346,100 119 122 Jumper Pilot Suspension Insulator set (Zebra) 49202 Set 1,828,750 93 0 0 93 170,073,750 036.PJ/9220/94/M

JUMLAH 170,073,750 120 137 Jumper Pilot Suspension Insulator Set (Zebra) 49202 Set 956,560 44 0 0 44 42,088,640 020.PJ/9220/95/M121 138 Hardware Fitting Double Suspension Insulator String Set 49202 Set 1,913,124 6 0 0 6 11,478,744 "

JUMLAH 53,567,384

Page 48: September 11

PJJB/FML/8-80 MATERIAL ATTB 48/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

LAMPIRAN USULAN PENARIKAN AKTIVA BULAN : SEPTEMBER 2011

HALAMAN 5 - 5NO NO NAMA BARANG KODE SAT HARGA STOCK

MASUK KELUARSTOCK HARGA NOMOR

KETERANGANURUT KARTU AKUN SATUAN (Rp.) AWAL AKHIR PEROLEHAN (Rp.) KONTRAK1 2 3 4 5 6 7 8 9 10 11 12 13

122 261 Kabel Kontrol NYY 1 KV ukuran 6 x 6 mm 49203 Mtr 2,619 135 0 0 135 353,565 PJP.003/PST/88123 262 Kabel Kontrol NYY 1 KV ukuran 4 x 10 mm 49203 Mtr 2,893 5 0 0 5 14,465 "124 263 Kabel Kontrol NYY 1 KV ukuran 1 x 50 mm 49203 Mtr 2,405 24 0 0 24 57,720 "

JUMLAH 425,750 125 163 Earthwire Suspension Assembly for GSW 55 49202 Set 734,202 14 0 0 14 10,278,828 124.PJ/9220/95/M123 164 Reverse low duty tension string Set 49202 Set 2,053,039 18 0 0 18 36,954,702 "

JUMLAH 47,233,530 127 395 Post Insulator 49202 Bh 9,645,000 6 0 0 6 57,870,000 119.PJ/9220/95/M

JUMLAH 57,870,000 128 397 * Kabel NYFGBY 4 x 10 mm 49202 Mtr 14,026 50 0 0 50 701,300 064.PJ/9220/97/M

JUMLAH 701,300 129 8 Drawer Tongue Earth Wire 9-0-10.7 49202 Bh 15,000 1 0 0 1 15,000 PJ.081/PST/78130 9 Drawer Tongue Ostrich 16.2-10.7 49202 Bh 15,000 2 0 0 2 30,000 "131 10 Earthing Kit 49202 Set 459,592 2 0 0 2 919,184 "132 11 Caulking Gun Expandite 70/150 KV 49202 Bh 12,000 3 0 0 3 36,000 "133 12 Midspand Stoking earth wire 49202 Bh 10,274 5 0 0 5 51,370 "134 13 Dead Stoking earth wire 6.4-12 49202 Bh 4,600 14 0 0 14 64,400 "135 14 Dead Stoking Zebra 1 1/8 49202 Bh 67,510 33 0 0 33 2,227,830 "136 15 Dead Stoking Dove 7/8" 49202 Bh 50,374 13 0 0 13 654,862 "137 16 Dead Stoking Skunk 3/8" 49202 Bh 44,405 9 0 0 9 399,645 "138 17 Dead Stoking Hawk 7/8" 49202 Bh 50,734 19 0 0 19 963,946 "139 18 Drawer tongue Zebra 27.0.29.5 49202 Bh 227,910 16 0 0 16 3,646,560 "140 19 Earthing Kit 49202 Set 459,594 3 0 0 3 1,378,782 "141 20 Midspand Stoking Zebra 19707 49202 Bh 6,600 39 0 0 39 257,400 "142 21 Midspand Stoking Dove 19705 49202 Bh 6,600 39 0 0 39 257,400 "143 22 Midspand Stoking Hawk 19705 49202 Bh 6,600 39 0 0 39 257,400 "144 23 Midspand Stoking Steel 19703 49202 Bh 6,600 18 0 0 18 118,800 "145 24 Midspand Stoking Skunk 19703 49202 Bh 6,600 20 0 0 20 132,000 "146 25 Linesmen Troly Dove / Zebra 49202 Bh 404,780 4 0 0 4 1,619,120 "147 26 Templete tower type 2 AN 49202 Set 235,670 1 0 0 1 235,670 "148 27 Dies Steel Earth Wire 16.05 49202 Bh 235,670 1 0 0 1 235,670 "

JUMLAH 13,501,039

J U M L A H T O T A L 2,989,590,284

Page 49: September 11

PJJB/FML/8-81

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

NILAI PERSEDIAAN, PENERIMAAN DAN PEMANFAATAN MATERIAL PDPBULAN : SEPTEMBER 2011

PERSEDIAAN MATERIAL PENERIMAAN PEMANFAATAN MATERIALNO PENCADANGAN SISA BEBAS JUMLAH MATERIAL UNIT SENDIRI UNIT LAIN JUMLAH KETERANGAN

(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)

1 97,208,899,671 15,123,828,082 112,332,727,753 0 7,447,477,878 0 7,447,477,878

TOTAL TOTAL TOTAL PERSEDIAAN PENERIMAAN PEMANFAATAN

112,332,727,753 0 7,447,477,878

Page 50: September 11

PJJB/FML/8-82 MATERIAL MASUK 50/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

KONTRAK PENGADAAN/MATERIAL RETURPENERIMAAN MASUK GUDANG

BULAN : SEPTEMBER 2011

NO NO KODE BARANG NAMA BARANG SAT VOL NO. KONTRAK NILAI (Rp) KETERANGANKARTU

NIHIL

0

Page 51: September 11

PJJB/FML/8-83

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

REKAPITULASI LAPORANTAHUN 2011

P D P ATTB

JANUARI 2011Saldo Awal = 116,088,286,226 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 0 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

116,088,286,226 Saldo Akhir 2,989,590,284Pemasukan/retur 0Saldo Akhir 116,088,286,226

FEBRUARI 2011Saldo Awal = 116,088,286,226 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 3,342,475 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

Saldo Akhir 116,084,943,751 Saldo Akhir 2,989,590,284

MARET 2011Saldo Awal = 116,084,943,751 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 242,760,000 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

115,842,183,751 Saldo Akhir 2,989,590,284Pemasukan/retur 0

Saldo Akhir 115,842,183,751

APRIL 2011Saldo Awal = 115,842,183,751 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 0 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

115,842,183,751 Saldo Akhir 2,989,590,284Pemasukan 0Saldo Akhir 115,842,183,751

MEI 2011Saldo Awal = 115,842,183,751 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 0 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

Saldo Akhir 115,842,183,751 Saldo Akhir 2,989,590,284

JUNI 2011Saldo Awal = 115,842,183,751 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 0 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 176,945,868 Mutasi Unit Lain = 0

Saldo Akhir 115,665,237,883 Saldo Akhir = 2,989,590,284

Page 52: September 11

PJJB/FML/8-83

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

REKAPITULASI LAPORANTAHUN 2011

P D P ATTB

JULI 2011Saldo Awal = 115,665,237,883 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 0 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

Saldo Akhir 115,665,237,883 Saldo Akhir 2,989,590,284Pemasukan 4,114,967,748Saldo Akhir 119,780,205,631

AGUSTUS 2011Saldo Awal = 119,780,205,631 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 0 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

Saldo Akhir 119,780,205,631 Saldo Akhir 2,989,590,284

SEPTEMBER 2011Saldo Awal = 119,780,205,631 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 7,447,477,878 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

112,332,727,753 Saldo Akhir 2,989,590,284Pemasukan/retur 0

Saldo Akhir 112,332,727,753

OKTOBER 2011Saldo Awal = 112,332,727,753 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 0 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

112,332,727,753 Saldo Akhir 2,989,590,284Pemasukan 0Saldo Akhir 112,332,727,753

NOVEMBER 2011Saldo Awal = 112,332,727,753 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 0 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

112,332,727,753 Saldo Akhir 2,989,590,284Pemasukan 0Saldo Akhir 112,332,727,753

DESEMBER 2011Saldo Awal = 112,332,727,753 Saldo Awal = 2,989,590,284Mutasi Unit Sendiri = 0 Mutasi Unit Sendiri = 0Mutasi Unit Lain = 0 Mutasi Unit Lain = 0

112,332,727,753 Saldo Akhir = 2,989,590,284Pemasukan 0Saldo Akhir 112,332,727,753

Page 53: September 11

PJJB/FML/8-84 MATERIAL SISA BEBAS 53/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

DAFTAR MATERIAL SISA BEBASGARDU INDUK

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 1 - 5

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSK KELUARSISA SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL AKHIR JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 12 13 14

1 251 Single Phase Current Transformer Post Housing 202 BG 002 S 018 Set 6,096,023 3 0 0 3 3 18,288,069 PJ.P.021/PST/88. GI. SUMEDANGThe follow CT'S : one 200/100/5A 25VA

SUB JUMLAH 18,288,069 G1

1 283 Busbar Conductor & Connection Eq. 400 M 202 BG 002 B 009 Set 5,500,000 3 0 0 3 3 16,500,000 084.PJ/9220/1990/M

SUB JUMLAH 16,500,000 G2

1 412 Busbar Conductor TAL 980 mm2 202 BG 002 B 010 Mtr 39,600 1,590 0 0 1,590 1,590 62,964,000 096.PJ/063/PIKIT JJ/97

SUB JUMLAH 62,964,000 G3

1 204 Kabel NA2XSY 20 KV ukuran 1x150 mm2 203 BG 003 K 017 Mtr 5,968 1,300 0 0 1,300 1,300 7,758,400 PJ.031/PST/88

SUB JUMLAH 7,758,400 G4

1 206 Out Door Termination for 150 sqmm 204 BG 004 O 001 Bh 136,393 43 0 0 43 43 5,864,899 PJ.020/PST/882 207 In Door Termination for 150 sqmm 204 BG 004 I 001 Bh 67,500 12 0 0 12 12 810,000 "3 208 In Door Termination for 240 sqmm 204 BG 004 I 002 Bh 77,050 1 0 0 1 1 77,050 " 1 set = 2 bh.

SUB JUMLAH 6,751,949 G7

1 415 Single Phase Current Transformer Post Housing the follow CT'S : 202 BG 002 S 019 Bh 5,360,761 3 0 0 3 3 16,082,283 PJP.021/PST/88 GI. KRACAKone 200/100/5A C1 5P20 for different and restricted e/f protection.

2 417 Alarms Instrument& Control 110V DC Switch - board. 202 BG 002 A 001 Set 4,845,775 1 0 0 1 1 4,845,775 PJP.021/PST/88 GI. KRACAK3 419 Overhead Earth Wire,Connect. Electrode for main Subtant. Earth. 202 BG 002 O 006 Set 679,544 1 0 0 1 1 679,544 " GI. KRACAK

SUB JUMLAH 21,607,602 G8

1 421 Allu Conduct, Connectors, Insulators, and marshaling kiosk etc. 202 BG 002 A 004 Set 8,216,687 2 0 0 2 2 16,433,374 PJP.021/PST/88 GI. CILEGON2 422 Single Phase Current Transformer Post Hous the follow CT'S : 202 BG 002 S 017 Bh 13,689,317 3 0 0 3 3 41,067,951 " GI. CILEGON

one 300/150/5A 45 VA 3 423 Overhead Earth Wire.Connect.Electrode for main Subtant. Earth. 202 BG 002 O 009 Set 982,000 2 0 0 2 2 1,964,000 " GI. CILEGON

SUB JUMLAH 59,465,325 G9

1 295 Terminasi Joint 20 KV GE 202 BG 002 T 001 Set 379,499 3 0 0 3 3 1,138,497 " 018-0202 296 Terminasi Joint 20 KV MG 202 BG 002 T 002 Set 379,500 3 0 0 3 3 1,138,500 " 018-021

SUB JUMLAH 2,276,997 G10

1 300 Lampu Mercury 125 W/220 V + kabel NGBFBY uk. 4x6 mm t. 1 m 202 BG 002 L 004 Set 468,528 11 0 0 11 11 5,153,808 SPK.382/9220/1991/M 019-002

SUB JUMLAH 5,153,808 G11

= MUTASI MATERIAL

Page 54: September 11

PJJB/FML/8-84 MATERIAL SISA BEBAS 54/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

DAFTAR MATERIAL SISA BEBASGARDU INDUK

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 2 - 5

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSK KELUARSISA SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL AKHIR JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 12 13 14

1 301 Kabel Gland ukuran 12 mm 202 BG 002 K 006 Bh 2,470 150 0 0 150 150 370,500 SPK.012/9220/1991/M 013-0052 307 Terminasi kabel power 20 Kv / 240 mm 202 BG 002 T 004 Set 579,700 3 0 0 3 3 1,739,100 " 013-0173 308 Lamp Mercury 125 W/220 V + kabel NGBFBY uk. 4x6 mm t. 2,4 m 202 BG 002 L 005 Set 646,858 17 0 0 17 17 10,996,586 " 013-0014 309 Lamp Mercury 125 W/220 V + kabel NGBFBY uk. 4x6 mm t. 1 m 202 BG 002 L 006 Set 563,093 10 0 0 10 10 5,630,930 " 013-0025 310 Terminasi Mof u/ Joint Cubicle 20 KV type type ASEA 202 BG 002 T 005 Set 579,700 3 0 0 3 3 1,739,100 " 013-0156 311 Terminasi Mof u/ Joint Cubicle 20 KV MG type IV 202 BG 002 T 003 Set 579,700 3 0 0 3 3 1,739,100 " 013-0167 312 Amper meter dengan skala penuh 500 A 202 BG 002 A 005 Bh 112,876 3 0 0 3 3 338,628 " 013-018

SUB JUMLAH 22,553,944 G12

1 338 MCB untuk 3 phase 40 A 202 BG 002 M 005 Bh 74,250 5 0 0 5 5 371,250 SPK.02/921/1992/M. 014-0012 339 MCB untuk 1 phase 32 A 202 BG 002 M 004 Bh 66,866 2 0 0 2 2 133,732 " 014-0023 340 Kabel Gland ukuran 12 mm 202 BG 002 K 002 Bh 2,476 250 0 0 250 250 619,000 " 014-0034 341 Kabel Gland ukuran 16 mm 202 BG 002 K 004 Bh 2,723 134 0 0 134 134 364,882 " 014-0045 348 Kawat BC 70 Sqmm u/Grounding 202 BG 002 K 016 Mtr 7,920 80 0 0 80 80 633,600 " 014-012

SUB JUMLAH 2,122,464 G13

1 313 Mini Circuit Breakers 3 phase 40 A 202 BG 002 M 006 Bh 74,965 2 0 0 2 2 149,930 SPK.011.PJ/9220/91/M. 012-0022 314 Mini Circuit Breakers 1 phase 32 A 202 BG 002 M 003 Bh 59,950 2 0 0 2 2 119,900 " 012-0033 315 Kabel Gland ukuran 12 mm 202 BG 002 K 003 Bh 2,475 150 0 0 150 150 371,250 " 012-0044 316 Kabel Gland ukuran 16 mm 202 BG 002 K 005 Bh 2,750 150 0 0 150 150 412,500 " 012-005

SUB JUMLAH 1,053,580 G14

1 351 20 KV R. Control Panel Type A Outgoing Feeder 202 BG 002 S 033 Set 24,194,752 10 0 0 10 10 241,947,520 079.PJP/922/1992/M.2 352 20 KV R. Control Panel Type B Outgoing Feeder 202 BG 002 S 034 Set 32,946,001 4 0 0 4 4 131,784,004 "3 353 20 KV R. Control Panel Type C for Bus Section 202 BG 002 S 035 Set 10,970,023 10 0 0 10 10 109,700,230 "4 354 20 KV R. Control Panel Type D Shunt Capasitor 202 BG 002 S 036 Set 6,446,999 7 0 0 7 7 45,128,993 "

SUB JUMLAH 528,560,747 G16

1 358 Stell Structure to be complete the specified scope 202 BG 002 S 026 Set 39,600,000 1 0 0 1 1 39,600,000 100.B.PJ/9220/94/M.2 359 150 KV CT for Transformer Bay 150/20 KV with Support (600A) 202 BG 002 C 008 Lot 28,050,000 3 0 0 3 3 84,150,000 "3 361 20 KV Neutral Earthing Resistor 40 Ohm, 1000A. 202 BG 002 N 001 Set 74,200,000 1 0 0 1 1 74,200,000 "4 362 Outdoor 150KV Neutral CT to be Instalated Tank 202 BG 002 O 005 Set 14,850,000 1 0 0 1 1 14,850,000 "

SUB JUMLAH 212,800,000 G17

1 363 Stell Structure to be complete the specified scope 202 BG 002 S 025 Lot 54,202,500 1 0 0 1 1 54,202,500 118.C.PJ/9220/94/M.2 364 150 KV 3 phase DS Motor Operated 40 KA, 1250A 202 BG 002 P 015 Set 61,050,000 1 0 0 1 1 61,050,000 "3 367 Alumunium Busbar Conduct and Jumper Conduct Etc. 202 BG 002 A 002 Set 12,925,000 1 0 0 1 1 12,925,000 "4 369 Protection Cubicle for Transformer 150/20 KV 3 Pole 202 BG 002 P 041 Lot 152,295,000 1 0 0 1 1 152,295,000 "5 370 Control Cubicle for Transformer 150/20 KV Diagram 202 BG 002 C 003 Lot 78,925,000 1 0 0 1 1 78,925,000 "6 371 Control Cable, Terminal Blocks, Link, Fuses, Etc 202 BG 002 C 002 Lot 27,390,000 1 0 0 1 1 27,390,000 "

SUB JUMLAH 386,787,500 G18

1 331 Kabel Gland ukuran 12 mm 202 BG 002 K 001 Bh 2,178 500 0 0 500 500 1,089,000 SPK. 094.PJ/92/M.2 335 Mini Circuit Breaker AC, 3 Phase 40 A 202 BG 002 M 007 Bh 73,634 1 0 0 1 1 73,634 "

SUB JUMLAH 1,162,634 G19

Page 55: September 11

PJJB/FML/8-84 MATERIAL SISA BEBAS 55/58

Page 56: September 11

PJJB/FML/8-84 MATERIAL SISA BEBAS 56/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

DAFTAR MATERIAL SISA BEBASGARDU INDUK

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 3 - 5

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSK KELUARSISA SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL AKHIR JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 12 13 14

1 355 203 BG 003 O 001 Bh 462,000 3 0 0 3 3 1,386,000 PJ.01/PRINGJB/93/M. 1 Dus 3 bh2 356 203 BG 003 I 001 Bh 533,200 3 0 0 3 3 1,599,600 " 1 Dus 3 bh

SUB JUMLAH 2,985,600 G22

1 185 Battery Charger 48V DC battery complete with panelboard. 202 BG 002 D 002 Set 14,583,670 1 0 0 1 1 14,583,670 129PJ/PRI.JB/93/M.

SUB JUMLAH 14,583,670 G24

1 396 Steel struct gantry (13,5m+3,5m) support beam (14m). 202 BG 002 S 024 Set 99,635,619 1 0 0 1 1 99,635,619 208.PJ/9220/1995/M.

SUB JUMLAH 99,635,619 G24

1 397 Contr. Cable,term. block,link, fuses, etc.comp the scope of work Lot* Kabel NYFGBY 2 x 6 mm 202 BG 002 K 012 Mtr 8,015 355 0 0 355 355 2,845,325 064.PJ/97/M.

2 404 150 KV CT for feeder bay complete with support core : 1,2,3,4. 202 BG 002 P 016 Set 27,665,735 6 0 0 6 6 165,994,410 "3 405 Battery Charger for 48 V DC battery 40 A Set PM 1 0 0 1 1 "4 406 48 V DC battery suitable for supplying all 48 V DC load Set PM 1 0 0 1 1 "

8 hours discharger minimum 250 AH.

SUB JUMLAH 168,839,735 G26

1 591 Low Voltage Cubicle Type Freestanding/PRISMA 202 BG 002 R 001 EX GI. 150KV HAURGEULIS(E03 + EF10) Bus Coupler (Relay Panel 1A) Set 521,000,000 1 0 0 1 1 521,000,000 059.PJ/131/PIKIT JBN/04 PT. ASIH SILAPURNA

2 592 Low Voltage Cubicle Type Freestanding/BLOCKSET 202 BG 002 B 010(E03 + ES10) 150 KV Bus Coupler Including Syncrho Panel. Set 366,880,000 1 0 0 1 1 366,880,000 059.PJ/131/PIKIT JBN/04 "(Control Panel 1A with sincronizing Panel)

SUB JUMLAH 887,880,000 G28

1 600 150 KV CT for Bus Coupler Complete+Clamp & Support Struct. 202 BG 002 C 015 Unit 116,402,000 3 0 0 3 3 349,206,000 077.PJ/131/PIKIT JBN/04

SUB JUMLAH 349,206,000 G29

1 637 Marshaling Kiosk 202 BG 002 M 012 Set 50,182,121 1 0 0 1 1 50,182,121 113.PJ/133/PIKIT JBN/062 639 Steel Structure u/ Disconecting Switches 150 KV 202 BG 002 S 040 Set 16,142,995 2 0 0 2 2 32,285,990 "

SUB JUMLAH 82,468,111 G30

1 800 150 KV Current Transformer for Line Bay Complete 201 BG 002 C 001 Unit 64,599,285 6 0 0 6 6 387,595,710 018.PJ/133/PIKIT JBN/07

SUB JUMLAH 387,595,710 G30

TOTAL SIBAS GARDU INDUK 3,349,001,464

Outdoor Termination Kabel 20 KV ukuran 1 x 150 mm2

Indoor Termination Kabel 20 KV ukuran 1 x 150 mm2

Page 57: September 11

PJJB/FML/8-84 MATERIAL SISA BEBAS 57/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

DAFTAR MATERIAL SISA BEBASTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 4 - 5

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSK KELUARSISA SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL AKHIR JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 12 13 14

1 184 Spacer Jumper 2 x Zebra 202 BT 002 S 023 Pcs 147,400 191 0 0 191 191 28,153,400 EX PLN JATENG.

SUB JUMLAH 28,153,400 1 78 Stub Angle type BBS+9 202 BT 002 S 032 Set 3,864,856 1 0 0 1 1 3,864,856 53.P/9220/1993/M2 79 Tower type BBS+9 202 BT 002 T 015 Set 17,474,940 1 0 0 1 1 17,474,940 "3 83 Anti Clembing Device 202 BT 002 A 006 Set 44,187 5 0 0 5 5 220,935 "4 84 Counterpoice Copper Wire of 55 mm (GSW) 202 BT 002 C 004 Mtr 439 2,178 0 0 2,178 2,178 956,142 "5 87 Earthing Device 202 BT 002 E 001 Pcs 11,014 194 0 0 194 194 2,136,716 "

SUB JUMLAH 24,653,589 T29

1 127 Plate Tanda Bahaya 202 BT 002 P 029 Set 130,790 230 0 0 230 230 30,081,700 063.PJ/9220/1995/M.2 128 Plate Phasa dan Plate Nomor Lengkap 202 BT 002 P 037 Set 130,790 231 0 0 231 231 30,212,490 "3 129 Peralatan Pentanahan Lengkap 202 BT 002 P 008 Set 523,160 195 0 0 195 195 102,016,200 "

SUB JUMLAH 162,310,390 T32

1 136 Plate Anti Panjat Lengkap 202 BT 002 P 018 Bh 330,000 18 0 0 18 18 5,940,000 053.PJ/9220/1995/M.

SUB JUMLAH 5,940,000 T33

1 161 Peralatan Anti Panjat 202 BT 002 P 012 Set 379,500 15 0 0 15 15 5,692,500 051.PJ/9220/1995/M.

SUB JUMLAH 5,692,500 T38

1 167 Double Suspension Insulator String Set 202 BT 002 D 004 Set 2,079,209 48 0 0 48 48 99,802,032 206.PJ.P/95/M

SUB JUMLAH 99,802,032 T40

1 176 Tower Type AA 6 + 0 202 BT 002 T 009 Set 38,206,740 2 0 0 2 2 76,413,480 060.PJ/9220/1995/M.2 177 Tower Type AA 6 + 3 202 BT 002 T 011 Set 42,960,773 0 4 0 4 4 171,843,092 "3 179 Tower Type AA 6 + 12 202 BT 002 T 010 Set 54,213,445 2 0 0 2 2 108,426,890 "4 182 Peralatan Pentanahan Lengkap 202 BT 002 P 002 Set 528,000 9 0 0 9 9 4,752,000 "5 183 Peralatan Panjat Lengkap 202 BT 002 P 009 Set 308,000 146 0 0 146 146 44,968,000 "

SUB JUMLAH 406,403,462 T43

1 186 Armorrods for 2 x ACSR Zebra 202 BG 002 A 007 Set 82,257 204 0 0 204 204 16,780,428 129.PJ/PRI.JB/93/M.2 189 Double suspension string for 2 x ACSR Zebra 202 BG 002 D 005 Set 41,667 72 0 0 72 72 3,000,024 "3 191 Jumper pilot suspension assembly for 2x ACSR Zebra. 202 BG 002 J 001 Set 1,104,057 36 0 0 36 36 39,746,052 "4 194 Tower Type 4EE 6 + 0 202 BG 002 T 008 Set 158,064,235 1 0 0 1 1 158,064,235 "

SUB JUMLAH 217,590,739 T44

1 530 Tower Type AA6 + 3 202 BT 002 T 028 Unit 115,060,000 28 0 0 28 28 3,221,680,000 078.PJ/131/PIKIT JBN/03 T/L 150 KV Patuha-Lagadar (TWINK)2 538 Double Suspension Insulator Set 202 BT 002 D 008 Unit 10,890,000 186 0 0 186 186 2,025,540,000 "3 540 Armour Rod for ACSR Zebra 202 BT 002 A 011 Set 1,045,000 336 0 0 336 336 351,120,000 "4 541 Vibration Damper 202 BT 002 V 003 Bh 715,000 206 0 0 206 206 147,290,000 "

SUB JUMLAH 5,745,630,000 T45

Page 58: September 11

PJJB/FML/8-84 MATERIAL SISA BEBAS 58/58

PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN JAWA BALI UNIT PELAKSANA KONSTRUKSI JARINGAN JAWA BALI REGION IV

DAFTAR MATERIAL SISA BEBASTRANSMISI

GUDANG : CIGERELENGBULAN : SEPTEMBER 2011

HALAMAN 5 - 5

NONO

NAMA BARANG KODE

SATHARGA STOCK

MSK KELUARSISA SISA BEBAS NOMOR

KETERANGANKRT BARANG SAT (Rp) AWAL AKHIR JUMLAH (Rp) KONTRAK

1 2 3 4 5 6 7 8 9 10 12 13 14

1 569 Armour Rods For GSW 55 mm 202 BT 002 A 013 Set 325,600 115 0 0 115 115 37,444,000 075.PJ/131/PIKIT JBN/042 572 Set Of Suspension Clamp Complete 202 BT 002 K 028 Set 575,300 82 0 0 82 82 47,174,600

SUB JUMLAH 84,618,600 T45

1 608 Common Portion 202 BT 002 C 007 Kg 9,522 268,617 0 0 268,617 268,617 2,557,771,074 008.PJ/063/PIKIT JJ/01 Mat. Surflus Ex BBS2 609 Body Standard ( -3/+0 ) 202 BT 002 B 008 Kg 9,522 2,099 0 0 2,099 2,099 19,986,678 " "3 610 Body +9/+12 202 BT 002 B 009 Kg 9,522 7,963 0 0 7,963 7,963 75,823,686 " "4 611 Leg Extention 8M 202 BT 002 L 004 Kg 9,522 2,014 0 0 2,014 2,014 19,177,308 " "5 612 Leg Extention 9M 202 BT 002 L 005 Kg 9,522 3,145 0 0 3,145 3,145 29,946,690 " "6 613 Leg Extention 10M 202 BT 002 L 006 Kg 9,522 737 0 0 737 737 7,017,714 " "7 614 Leg Extention 11M 202 BT 002 L 007 Kg 9,522 548 0 0 548 548 5,218,056 " "8 615 Leg Extention 13M 202 BT 002 L 008 Kg 9,522 6,010 0 0 6,010 6,010 57,227,220 " "9 616 Leg Extention 14M 202 BT 002 L 009 Kg 9,522 4,709 0 0 4,709 4,709 44,839,098 " "

10 617 Leg Extention 16M 202 BT 002 L 010 Kg 9,522 5,349 0 0 5,349 5,349 50,933,178 " "

SUB JUMLAH 2,867,940,702 T50

TOWER TYPE BB :1 618 Leg Ext. 6M 202 BT 002 L 011 Kg 9,522 7,874 0 0 7,874 7,874 74,976,228 008.PJ/063/PIKIT JJ/01 Mat. Surflus Ex BBS2 619 Leg Ext. 7M 202 BT 002 L 012 Kg 9,522 790 0 0 790 790 7,522,380 " "3 620 Leg Ext. 12M 202 BT 002 L 013 Kg 9,522 4,432 0 0 4,432 4,432 42,201,504 " "

TOWER TYPE CC :1 621 Common Portion 202 BT 002 C 007 Kg 9,522 16,669 0 0 16,669 16,669 158,722,218 008.PJ/063/PIKIT JJ/01 "2 622 Body Standard 202 BT 002 B 008 Kg 9,522 3,524 0 0 3,524 3,524 33,555,528 " "3 623 Leg Ext. 4M 202 BT 002 L 014 Kg 9,522 1,452 0 0 1,452 1,452 13,825,944 " "4 624 Leg Ext. 9M 202 BT 002 L 005 Kg 9,522 1,643 0 0 1,643 1,643 15,644,646 " "5 625 Leg Ext. 11M 202 BT 002 L 007 Kg 9,522 1,230 0 0 1,230 1,230 11,712,060 " "6 626 Leg Ext. 12M 202 BT 002 L 013 Kg 9,522 1,711 0 0 1,711 1,711 16,292,142 " "7 627 Leg Ext. 13M 202 BT 002 L 008 Kg 9,522 4,830 0 0 4,830 4,830 45,991,260 " "

TOWER TYPE DD :1 628 Common Portion 202 BT 002 C 007 Kg 9,522 96,071 0 0 96,071 96,071 914,788,062 008.PJ/063/PIKIT JJ/01 "2 629 Leg Ext. 7M 202 BT 002 L 012 Kg 9,522 3,584 0 0 3,584 3,584 34,126,848 " "3 630 Leg Ext. 8M 202 BT 002 L 004 Kg 9,522 1,436 0 0 1,436 1,436 13,673,592 " "4 631 Leg Ext. 9M 202 BT 002 L 005 Kg 9,522 1,704 0 0 1,704 1,704 16,225,488 " "5 632 Leg Ext. 10M 202 BT 002 L 006 Kg 9,522 1,881 0 0 1,881 1,881 17,910,882 " "6 633 Leg Ext. 12M 202 BT 002 L 013 Kg 9,522 2,237 0 0 2,237 2,237 21,300,714 " "7 634 Leg Ext. 13M 202 BT 002 L 008 Kg 9,522 2,344 0 0 2,344 2,344 22,319,568 " ""

TOWER TYPE EE/FF :1 635 Common Portion 202 BT 002 C 007 Kg 9,522 69,870 0 0 69,870 69,870 665,302,140 008.PJ/063/PIKIT JJ/01 "

SUB JUMLAH 2,126,091,204 T50

TOTAL SIBAS TRANSMISI 11,774,826,618

JUMLAH TOTAL SISA BEBAS (GI + TR) 15,123,828,082