RMJ JALAN NASIONAL 2014.pdf

1

Click here to load reader

Transcript of RMJ JALAN NASIONAL 2014.pdf

  • No Gambar Uraian Volume SatuanJumlah Harga

    SatuanTotal Harga Satuan

    PATOK RMJ Pasir 20.16 M3 175,000.00 3,528,000.00

    Kerikil 11.20 M3 185,000.00 2,072,000.00

    Semen 196.00 Zak 72,500.00 14,210,000.00

    Besi 8 " 89.00 Ujung 55,500.00 4,939,500.00

    Besi 6 " 181.00 Ujung 27,500.00 4,977,500.00

    Kawat 15.00 Kg 25,500.00 382,500.00

    Baut 1/2 500.00 Bh 3,500.00 1,750,000.00

    Cat Warna Hitam 2.00 Kg 15,500.00 31,000.00

    Cat Warna Kuning 25.00 Kg 53,000.00 1,325,000.00

    33,215,500.00

    BBM Solar 40 Liter Hari 7,500.00 2,400,000.00

    25,000,000.00

    58,215,500.00 JUMLAH TOTAL

    1

    Jumlah

    Upah Kerja

    Pemasang Patok

    4 Orang

    15.00

    8.00

    20,000.00

    4 Hari 150,000.00 9,000,000.00

    Buah 500.00

    RENCAN ANGGARAN BIAYA PEMBUATAN PATOK RMJ JALAN NASIONAL 2014

    Jumlah

    Upah Kerja

    Pembuatan Patok

    Mobilisasi Patok

    RMJ

    10,000,000.00

    Hari 750,000.00 6,000,000.00

    40 Cm

    10 Cm

    40 Cm

    50 Cm

    7 6 7

    40Cm