No Gambar Uraian Volume SatuanJumlah Harga
SatuanTotal Harga Satuan
PATOK RMJ Pasir 20.16 M3 175,000.00 3,528,000.00
Kerikil 11.20 M3 185,000.00 2,072,000.00
Semen 196.00 Zak 72,500.00 14,210,000.00
Besi 8 " 89.00 Ujung 55,500.00 4,939,500.00
Besi 6 " 181.00 Ujung 27,500.00 4,977,500.00
Kawat 15.00 Kg 25,500.00 382,500.00
Baut 1/2 500.00 Bh 3,500.00 1,750,000.00
Cat Warna Hitam 2.00 Kg 15,500.00 31,000.00
Cat Warna Kuning 25.00 Kg 53,000.00 1,325,000.00
33,215,500.00
BBM Solar 40 Liter Hari 7,500.00 2,400,000.00
25,000,000.00
58,215,500.00 JUMLAH TOTAL
1
Jumlah
Upah Kerja
Pemasang Patok
4 Orang
15.00
8.00
20,000.00
4 Hari 150,000.00 9,000,000.00
Buah 500.00
RENCAN ANGGARAN BIAYA PEMBUATAN PATOK RMJ JALAN NASIONAL 2014
Jumlah
Upah Kerja
Pembuatan Patok
Mobilisasi Patok
RMJ
10,000,000.00
Hari 750,000.00 6,000,000.00
40 Cm
10 Cm
40 Cm
50 Cm
7 6 7
40Cm