Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT...

32
ANTI CORRUPTION ACTION PLAN (ACAP) RENCANA TINDAK ANTI KORUPSI (RTAK) LAPORAN PELAKSANAAN INTERVIEW PEMILIHAN PEMANTAU PIHAK KETIGA (PP3)/ THIRD PARTY MONITORING (TPM) PAKET 11: BANTAL – MUKOMUKO DAN PAKET 13: SP. RUKIS – TJ. KEMUNING PROVINSI BENGKULU 22 DESEMBER 2014 Report No: 14-06/23

Transcript of Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT...

Page 1: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

ANTI CORRUPTION ACTION PLAN (ACAP)RENCANA TINDAK ANTI KORUPSI (RTAK)

LAPORAN PELAKSANAAN INTERVIEW PEMILIHAN

PEMANTAU PIHAK KETIGA (PP3)/ THIRD PARTY MONITORING (TPM)

PAKET 11: BANTAL – MUKOMUKO DAN PAKET 13: SP. RUKIS – TJ. KEMUNING

PROVINSI BENGKULU

22 DESEMBER 2014

R e p or t N o : 1 4 -0 6 / 2 3

Page 2: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

Laporan Pelaksanaan Interview Pemilihan TPM Paket 11: Bantal – Mukomuko danPaket 13: Sp. Rukis – Tj. Kemuning, Provinsi Bengkulu Desember

Anti-Corruption Action Plan (ACAP) – Western Indonesia National Roads Improvement Project (WINRIP)

i

DAFTAR ISI

DAFTAR ISI i

I. PENDAHULUAN 1II. PELAKSANAAN INTERVIEW PEMILIHAN TPM 2III. HASIL PEMILIHAN 3IV. BERITA ACARA HASIL PEMILIHAN 3

DAFTAR LAMPIRAN ii

Page 3: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

Laporan Pelaksanaan Interview Pemilihan TPM Paket 11: Bantal – Mukomuko danPaket 13: Sp. Rukis – Tj. Kemuning, Provinsi Bengkulu Desember

Anti-Coruption Action Plan (ACAP) – Western Indonesia National Roads Improvement Project (WINRIP)1

I. PENDAHULUAN

Western Indonesia National Roads Improvement Project selanjutnya disingkat WINRIPmerupakan proyek bantuan Bank Dunia melalui International Bank for Reconstruction andDevelopment, dengan nomor IBRD Loan No. 8043-ID, Project ID: P090990, No. Reg. Pinjaman10842601. Naskah Perjanjian Pinjaman ditandatangani antara Pemerintah Indonesai denganBank Dunia pada tanggal 14 Desember 2011, dan tanggal efektif pinjaman 12 Maret 2012, sertaLoan Closing date, 31 Desember 2017.

Berdasarkan Appendix (Definition) 2, Loan Agreement Western Indonesia National RoadsImprovement Project (WINRIP) IBRD Loan No. 8043-ID menyebutkan bahwa PemerintahIndonesia harus melaksanakan Anti-Corruption Action Plan (ACAP) atau Rencana Tindak AntiKorupsi (RTAK) yang sejalan dengan Guidelines Bank Dunia tentang Pencegahan dan PerlawananTerhadap Tindak Penipuan dan Tindak Korupsi dalam proyek yang didanai oleh Bank Dunia, IDACredit dan Grant tertanggal 15 Oktober 2006 dan telah diperbaharui Januari 2011.

Pelaksanaan RTAK WINRIP adalah sejalan dengan komitmen Pemerintah Indonesia dalamrangka pemberantasan korupsi dan merupakan bagian dari upaya untuk mendukung KebijakanPemerintah terkait dengan Pemberantasan Korupsi yang telah digariskan dalam Undang-Undang Nomor 28 Tahun 1999 tentang Penyelenggaraan Negara yang Bersih dan Bebas dariKroupsi, Kolusi, dan Nepotisme (KKN) dan Undang-Undang Nomor 20 Tahun 2001 tentangPemberantasan Tindak Pidana Korupsi. RTAK dipersiapkan dan dilaksanakan oleh PemerintahIndonesia (Peminjam) dimana pengelolaannya berada di bawah Direktorat Jenderal Bina Marga.Komponen RTAK terdiri dari 4 (empat) pilar, yaitu:1. Pelibatan Wakil Pengamat Masyarakat (WPM)/Community Representative Observers (CRO)

untuk memantau proses Pelelangan/Pengadaan.2. Keterbukaan Informasi kepada Publik/Public Disclosure.3. Penanganan Pengaduan Masyarakat dan Pengelolaannya/Complaint Handling System (CHS).4. Pelibatan Pemantau Pihak Ketiga (PP3)/Third Party Monitoring (TPM) untuk memantau

tahap konstruksi.

Dalam rangka pemenuhan komponen keempat RTAK WINRIP, yaitu Pelibatan Pemantau PihakKetiga/Third Party Monitoring (TPM), PMU WINRIP mengirim Surat Pemberitahuan perihalPemantau Pihak Ketiga/Third Party Monitoring (TPM) untuk Paket 11 (Bantal – Mukomuko) danPaket 13 (Sp. Rukis – Tj. Kemuning) kepada Universitas Bengkulu (UNIB) pada tanggal 20Oktober 2014.

Sesuai dengan Kerangka Acuan Seleksi dan Pedoman Seleksi TPM maka langkah selanjutnyaadalah kedua Perguruan Tinggi tersebut mengirimkan Surat Pernyataan Minat dan Proposalkepada PMU WINRIP berisikan profil institusi, rencana kerja, dan rencana anggaran biayaoperasional pemantauan yang kemudian akan dievaluasi oleh PMU WINRIP. Setelah PMUWINRIP menerima proposal dari UNIB maka Ketua Pelaksana Harian PMU WINRIP mengirimkansurat No. UM.0206/BL-I/WINRIP/056 perihal “Ündangan Wawancara: Pemantau Pihak Ketigaatau Third Party Monitoring (TPM) Paket Paket 11 (Bantal – Mukomuko) dan Paket 13 (Sp. Rukis– Tj. Kemuning); Western Indonesia Roads Improvement Project (WINRIP) Loan IBRD 8043-ID”tanggal 16 Desember 2014 kepada UNIB.

Page 4: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

Laporan Pelaksanaan Interview Pemilihan TPM Paket 11: Bantal – Mukomuko danPaket 13: Sp. Rukis – Tj. Kemuning, Provinsi Bengkulu Desember

Anti-Coruption Action Plan (ACAP) – Western Indonesia National Roads Improvement Project (WINRIP)2

II. PELAKSANAAN INTERVIEW PEMILIHAN TPM

Interview pemilihan calon TPM Paket 11 (Bantal – Mukomuko) dan Paket 13 (Sp. Rukis – Tj.Kemuning) dilaksanakan pada hari Senin, 22 Desember 2014 pukul 09.30 – 15.30 WIB,bertempat di Kantor Satuan Kerja Pelaksanaan Jalan Nasional Wilayah I Provinsi Bengkulu, JalanIr. Rustandi Sugianto Km. 12+225 Pulau Baai – Bengkulu.

Interview pemilihan TPM Paket 11 (Bantal – Mukomuko) dan Paket 13 (Sp. Rukis – Tj.Kemuning) dihadiri oleh:1. Unsur Satuan Kerja Pelaksanaan Jalan Nasional Wilayah I Provinsi Bengkulu.2. Unsur Satuan Kerja Pelaksanaan Jalan Nasional Wilayah II Provinsi Bengkulu.3. Unsur Pejabat Pembuat Komitmen (PPK) 01 Paket 11.4. Unsur Pejabat Pembuat Komitmen (PPK) 06 Paket 13.5. Tim Evaluasi dan Pewawancara dari CTC WINRIP.6. Calon TPM yang menyatakan minat sebagai TPM dari Universitas Bengkulu (UNIB).

Interview pemilihan calon TPM dibuka oleh PPK 06 . Adapun para calon TPM yang hadir sebagaiberikut:

No Nama Institusi Asal Pekerjaan1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu2 Hardiansyah, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu3 Nanda Pratama, ST Universitas Bengkulu Asisten Dosen Universitas Bengkulu4 Hesti Aulia Sari, ST Universitas Bengkulu Asisten Dosen Universitas Bengkulu5 Hot Maria Angelina, ST Universitas Bengkulu Asisten Dosen Universitas Bengkulu6 Agung Febrianto, ST Universitas Bengkulu Asisten Dosen Universitas Bengkulu

Tim evaluasi terdiri dari:

No Nama Institusi Asal Pekerjaan1 Yakobus CTC WINRIP Community Development Officer2 Astrini Primanita CTC WINRIP Assistant Community Development

Tahapan kegiatan Interview Pemilihan TPM sebagai berikut:

1. Pembukaan oleh PPK 06.2. Penjelasan tentang Prosedur Pemilihan TPM oleh Community Development Officer CTC

WINRIP.3. Wawancara calon TPM oleh Tim Evaluasi CTC WINRIP.4. Evaluasi dan negosiasi Rencana Anggaran Biaya yang diajukan oleh calon TPM.5. Penetapan TPM Paket 11 (Bantal – Mukomuko) dan Paket 13 (Sp. Rukis – Tj. Kemuning).6. Penutupan oleh PPK KTU PPk 01.

Agenda Interview Pemilihan terlampir.

Page 5: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

Laporan Pelaksanaan Interview Pemilihan TPM Paket 11: Bantal – Mukomuko danPaket 13: Sp. Rukis – Tj. Kemuning, Provinsi Bengkulu Desember

Anti-Coruption Action Plan (ACAP) – Western Indonesia National Roads Improvement Project (WINRIP)3

III. HASIL PEMILIHAN TPM

Hasil pemilihan TPM adalah sebagai berikut:

1. Seluruh calon TPM dari Universitas Bengkulu memenuhi kriteria untuk menjadi TPM yangakan dibagi menjadi dua tim masing-masing untuk Paket 11 (Bantal – Mukomuko) danPaket 13 (Sp. Rukis – Tj. Kemuning), dengan rincian sebagai berikut:

Paket yang Dipantau Nama Jabatan

Paket 11(Bantal – Mukomuko)

1 Muhammad Fauzi, ST., MT Pemantau Utama2 Hesti Aulia Sari, ST Pemantau Anggota3 Hot Maria Angelina, ST Pemantau Anggota

Paket 13(Sp. Rukis – Tj. Kemuning)

1 Hardiansyah, ST., MT Pemantau Utama2 Agung Febrianto, ST Pemantau Anggota3 Nanda Pratama, ST Pemantau Anggota

2. Rencana Anggaran Biaya (RAB) operasional yang diajukan di dalam proposal olehUniversitas Bengkulu (UNIB) untuk kedua paket masing-masing sebesar Rp 78.287.000,00,setelah diadakan evaluasi dan negosiasi maka disetujui untuk masing-masing paket sebesarRp 72.753.450,00.

Selanjutnya TPM (Pemantau Utama dan Pemantau Anggota) terpilih menandatangani SuratPernyataan Kesediaan dan siap melaksanakan tugas mewakili kepentingan masyarakat danbertindak jujur serta independen dalam memantau kegiatan pelaksanaan konstruksi proyekWINRIP pada Paket 11 (Bantal – Mukomuko) dan Paket 13 (Sp. Rukis – Tj. Kemuning) di wilayahProvinsi Bengkulu, sehat jasmani dan rohani, serta tidak mempunyai keterlibatan langsungmaupun tidak langsung dengan kontraktor, konsultan supervisi, supplier (penyedia barang)maupun unsur-unsur pengelola proyek WINRIP lainnya.

IV. BERITA ACARA HASIL PEMILIHAN TPM

Berita Acara Pemilihan TPM Paket 11 (Bantal – Mukomuko) dan Paket 13 (Sp. Rukis – Tj.Kemuning) ditandatangani oleh PPK 06 dan tim evaluasi CTC WINRIP.

Berita Acara Pemilihan terlampir.

Page 6: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

Laporan Pelaksanaan Interview Pemilihan TPM Paket 11: Bantal – Mukomuko danPaket 13: Sp. Rukis – Tj. Kemuning, Provinsi Bengkulu Desember

Anti-Corruption Action Plan (ACAP) – Western Indonesia National Roads Improvement Project (WINRIP)

ii

DAFTAR LAMPIRAN

Lampiran I Undangan Wawancara TPM dari Ketua Pelaksana Harian PMUkepada Perguruan Tinggi

Lampiran II Agenda Pelaksanaan Interview Pemilihan TPM

Lampiran III Daftar Hadir Peserta

Lampiran IV Berita Acara Pemilihan TPM

Lampiran V Surat Keputusan Pembentukan TPM

Lampiran VI Dokumentasi

Page 7: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

KEMENTERIAN PEKERJAAN UMUMDIREKTORAT JENDERAL BINA MARGAP-IREKTORAT BINA PELAKSANAAN WIL:AYAH IJALAN PATTIMURA No.20, TLP 7251019, FrJ,.7244353, xesRvoRlN BARU -JAKARTA SELATA*NI"'{oDE pos(12110)

Nomor : dM'02oG /bL-1-WtstRl\? /o%Larnpilan: -

Kepada Yth,

Bapak Dekan Fakultas Teknik

Universitas tsengkulu

Jl. W.R. Supratman, Kandang Lirnun, Bengkulu 3837l

Jakarta, lbDesember 2014

Perihal : Undangan Wawancara Pemilihan Pemantauan Pihak Ketiga atau Third PartyMonitoring (IPN[) Paket 11 @antal - Mukomuko) dan Paket 13 (Sp. Rukis - Tj.Kemuning); lVestern Indonesia National Roads Improvement Project (WINRIP)Loan IBRD 8043-ID

Sebagai tindak lanjut dari Surat Pernyataan Minat dan Proposal yang diajukan institusi Bapak, denganini kami mengundang para calon Pemantau Pihak Ketiga untuk menghadiri Wawancara yang akandiselenggarakan pada:

Hari/Tanggal

Waktu

Tempat

Acara

Senin/ 22 Desember 201 4.

Jam 09.00 WIB - selesai.

Kantor Satuan Kerja Pelaksanaan Jalan Nasional Wilayah I Provinsi BengkuluJl. Ir. Rustandi Sugianto Km. 12+225, Pulau Baai - Bengkulu.

Wawancara Pemilihan Pemantau Pihak KetigalThird Party Monitoring (TPM).

Mengingat pentingnya acara ini, kami mengharapkan kehadiran para calon Pemantau Pihak Ketigauntuk mengikuti wawancara..

Demikian disampaikan, atas perhatian dan kerjasamanya kami mengucapkan terima kasih.

Kasubd,it-Si.sf,ppq.Pl.en'g endalianWilayahVPMU WINRIP

i"-,--.- ,_,,-.

1. Bapak Direktur Bina Program (sebagai laporan).2. Bapak Direktur Bina Pelaksanaan Wilayah I, Ditjen Bina Marga.3. Kepala Balai Besar Pelaksanaan Jalan Nasional @BPJN) III Palembang.4. Kasubdit Pembiayaan dan Kerjasama Luar Negeri, Dit. Bina Program.5. Kasatker Pembinaan Administrasi dan P2PHLN, Dit. Bina Program.6. Kasatker Pelaksanaan Jalan Nasional Wilayah I Provinsi Bengkulu.7. Kasatker Pelaksanaan Jalan Nasional Wilayah II Provinsi Bengkulu.8. Pejabat Pembuat Komitmen (PPK) 01 untuk Paket 11.

9. Pejabat Pembuat Komitmen (PPK) 06 untuk Paket 13.

10. PMU WINRIP.11. CTC WINRIP.12. File.

Page 8: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

Laporan Pelaksanaan Interview Pemilihan TPM Paket 11: Bantal – Mukomuko danPaket 13: Sp. Rukis – Tj. Kemuning, Provinsi Bengkulu Desember

Anti-Corruption Action Plan (ACAP) – Western Indonesia National Roads Project (WINRIP)

AGENDA PELAKSANAAN INTERVIEW PEMILIHAN PEMANTAU PIHAK KETIGA (PP3)/THIRD PARTY MONITORING (TPM)

Paket 11: Bantal – Mukomuko dan Paket 13: Sp. Rukis – Tj. KemuningWestern Indonesia National Roads Improvement Project (WINRIP)

Loan IBRD No. 8043 – ID

Bengkulu, 22 Desember 2014

Waktu Kegiatan Fasilitator

09.30 – 09.45 Pembukaan PPK 06

09.45 – 10.30 Penjelasan Prosedur Pemilihan TPM Community Development Officer CTCWINRIP

10.30 – 12.00 Interview Calon TPM Tim Evaluasi CTC WINRIP

12.00 – 13.15 ISHOMA

13.15 – 14.45 Evaluasi dan Negosiasi Rencana AnggaranBiaya Pemantauan Tim Evaluasi CTC WINRIP

14.45 – 15.15 Penetapan TPM dan PenandatangananBerita Acara Pemilihan TPM

Community Development Officer CTCWINRIP

15.15 – 15.30 Penutupan KTU PPK 01

Page 9: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 10: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 11: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

L-2

Nama lengkap Muhammad Fauzi, ST., MTTempat/ Tanggal Lahir Sigli127Juni 1970Pekerjaan Dosen Universitas BengkuluPendidikan Terakhir Magister Teknik Sipil UGMAlamat Jl. Unib Permai Blok I No. 50, Pematang Gubernur - BengkuluTelp/ HP/ e-mail 0736-73l0295/081367690429/fauzi70 [email protected]

Tim TPM terpilih terdiri dari Pemantau Utama dan Pemantau Anggota untuk Paket 11 (Bantal -Mukomuko), sebagai berikut:1. Pemantau Utama selaku Ketua Tim: .

Berdasarkan hasil evaluasi pada angka romawi III di atas, maka diputuskan bahwa semua calonyang dariUniversitas Bengkulu (UNIB) memenuhi kriteria untuk ditetapkan sebagai Tim TPM dan akan dibagi kedalam dua tim yang akan diusulkan masing-masing untuk Paket 11: Bantal - Mukomuko dan Paket 13:Sp. Rukis - Tj. Kemuning, Provinsi Bengkulu. Selanjutnya akan diterbitkan Surat Keputusan DirekturBina Program, Ditjen Bina Marga selaku Ketua PMU tentang Pengangkatan TPM terpilih dan segeradimobilisasi.

IV. KEPUTVSAN

a. Proposal RAB operasional yang diajukan oleh calon Tim TPM untuk Paket 11 (Bantal -Mukomuko) sebesar Rp 78.257.000,00., dan setelah diadakan evaluasi maka disetujui sebesar Rp72.753.450,00.

b. Proposal RAB operasional yang diajukan oleh calon Tim TPM untuk Paket 13 (Sp. Rukis - Tj.Kemuning) sebesar Rp 78.257.000,00., dan setelah diadakan evaluasi maka disetujui sebesar Rp72.753.450,00.

2. Hasil WawancaraSeluruh calon TPM dari UNIB untuk kedua paket memenuhi persyaratan dengan hasil sepertitercantum pada lembaran hasil wawancara (lampiran 2).

1. Hasil Evaluasi Proposal

III. BASIL EVALVASI

1) Muhammad Fauzi, ST., MT2) Hardiansyah, ST.,MT3) Nanda Pratama, ST4) Hesti Aulia Sari, ST5) Hot Maria Angelina, ST6) Agung Febrianto, ST

2. Tim Evaluasi dan Wawancara terdiri dari:a. Yakobus, Community Development Officer CTC WINRIPb. Astrini Primanita, Asisten Community Development Officer CTC WINRIP

3. Proses Evaluasi dan WawancaraProses Evaluasi meliputi evaluasi proposal yang telah disampaikan calon TPM kepada PMUtermasuk Rencana Anggaran Biaya Operasional dan Rencana Kerja TPM.Wawancara dilakukan untuk mengukur tingkat penguasaan calon TPM terhadap tiga unsur yangakan dipantau yaitu manajemen pelaksanaan kontrak, pelaksanaan teknis konstruksi, danpelaksanaan pengelolaan lingkungan hidup.

Page 12: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 13: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 14: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 15: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 16: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 17: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 18: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 19: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 20: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 21: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 22: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

co RI

enRI

J:lE<11...J"0R

I<11s:...<11>o ';::RI

"0 oSoI- x

10c:iz

«"iii...oI-

ONOON

o~

~oN

ooioto

000

oN

or'l

"~~~~--~----~~~_'_'_'-+-+-+-+-+-+-+-+~---r-r'_'_+-f-'_-r~-+-+--,r-1III~

00

000

000

00

0'

00

00

0

o&

ss

888888

~~

~s~~~

8g.;;;;;;.

00

ciciciLfiLfiLfi

00

l!)N

ci10........

L!)

L!)000

f""-.."""""""O::>C

O~

or-

L!)

a.~~

~r---r---r---

iouo

uor'lr'l

o

000

00l!)0~~

or'l

Nto

00

0066

00

00

cicitON

l!)~

"<I'ci

000

000

666

000

000

cicici000

l!)l!)l!)"<1'"<1'"<1'

000

000

666

000

000

cicici000

"'''''''r---r---r---

00'

0066

00

00LficiNO

l!)C!

~

o0_ooocioio"<I'

o0_ooociioC':l~

0000000000

000000_

00_0

ggggg8

g8g

000000

0co

l!)Lficicicici

cici

cici

"'_~L!)O

Oen

OJ:!('!")

~'¢Cl:!C!CX.)Cl:!Cl:!Nto

o0_ooC!

oor---

Page 23: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

00 ';:ril"C U:soI- o x

ootoNor-:It)Nex)I'-

ool[)r-,N..,f

:+:ct;c:

_o0

UI-

LO

QjOJ.~.­

Ole

e(1)

W.~

,_;OJ

0-""

~OJ

~Om

C,~

OmOr/),_;

(1)

g;,-g.20.E"§W1:l

e0>

(1)e

0):;:;e

OJOJ

OJ1:lE

'(j)c

(1)°.~~

"E2

8t)::.:::ecoYo.~&0.

NNN

oz

OJiii- oI-';:ril"C <tiii- oI-

c~o0.j

,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,e

i(1)

,:::l

'(1)

,

C'~I

!CO

~II

~E

.~!I

!I

rfjl

lclU)c

clc!~!~

~(01

(01O.

Cl)0

o!gjg1~

c,

0.:C'i:q....Jl-;:n

cj

_51....J1C1CU.~

~>lc!19!c

(j)R§i~!~!E

.0......"-

UI@

..a::JE

.8:.c

.8:c

1E:.;x:Q)

o...:::s:::01

Q)l

(1)10

n,

LL«LLlo...la..IO

>< rn19oI-

000

0o

N0

ol[)

'"l[)

NvN

NNN

o'"ONOON

ooN

000

000,

000

000

000

000

000

"'''''''cO

cOcO

00

0_0_

00

000000

Ol[)

'"

o0

o0_

o0

o0

o0

ol[)

oN

OJ

co

000000

00

0.000

CDN

l[)..,fcri

000

000

000

000

000

000

000

OJ

OJ

OJ

tDtDtD

oooooool[)..,f

NNN

o0_ooool[)'"

N'"NOJ

OJ

OJ

o'"

-c:::l ro'0I-

ooooool[)'"

~~~--~~-O---+---O----+--+o~~O-+-o-+--ro-i-o-+o~r-'_o-+o--~~o-+~'~o-i--o---+o_'-O-+~r-+-O~--+--+--+--+--+----+---i

g_~~

~888

~8~~~

l[)8

l[)l[)~

~

eC;;

l[)l[)

888~~~

coco~

N~

c..0

r-r-r-l[)l[)l[)

"''''

o

000

000

0l[)0

0N

OJ

00'

00

00

00

00

l[)ONO

l[)0

000

000

000

000

000.000

000

l[)l[)l[)..,f..,f..,f

000

000

000

000

0.0.0.000

000

coCO

COr-.:r-.:r-.:

0000000

0_0_0.0_0.0

000000

000000

000000

w-iooooo

r-:;:~8&l8iNCD

ooooooor-

00

0000

00

0000

CDN

l[)..,fcri

oooooool[)..,f

ooooool[)'"

Page 24: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas
Page 25: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

MENGINGAT:1. Lo'8Il Agreement of WINRIP, Loan Number 8043-ID between Republic of Indonesia and

International Bank for Reconstruction Development (lBRD) World Bank, dated December 14,2011, Schedule 2 Section Ie "The Borrower (Government of Republic of indonesia) shallensure thai the Project is carried out tn accordance with the provisions of the Anti-CorruptionGuidelines and the Anti-Corruption Aciion Plan;

2. Loan Agreement WINRIP, Appendix, Definition 2, .The Borrower seuing forth the action to betaken Ami-Corruption Action Plan (ACAP) to promote good' governance and accountabilityincluded in Project Management Manual (P.MM) ":

3_ Loan Agreement WINRIP, Appendix; Definition 3 about Anti-Corruption Guidelines: "TheWorld Bank's Guidelines on Preventing and Combating Fraud and Corruption in ProjectsFinanced by IBRD Loans and IDA Credits and Grants, Dated October 15, 2006 and Revised inJanuary, 2011";

4. Project Implementation Plan (PIP) WINRIP Part 3.7 and Part 4, annex 10 and annex 11;5. Surat Kepntusan Menteri Pekerjaan Umum Nomor 419IKPTSIMI2010 tanggal 21 Juri 20]0

tentang Pembebasan dan Pengangkatan Pejabat Pimpinan EseLon II.a di LingkunganKementerian Pekerjaan Umum;

6. Sura! Keputusan Menteri Pekerjaan Umnm Nomor 418/KPTS/M/2011 tanggal 23 Desember2011 tentang Pengangkatan Atasan/Atasan Langsung Kepala Satuan Kerja dan Pejabat IntiSatuan Kerja di LingkunganDirektorat Jenderal Bina Marga Kementeri an Pekerjaan Umum;

7. Surat Keputusan Menteri Pekerjaan Umum Nomor 931KPTS1MI2013 tanggal 28 Februari 2013tentang Perubahan Keputusan Menteri Pekerjaan Umum Nornor 4181KPTSJMl2011, Nomor419IKPTSIM(20] 1 dan Nornor 2S4/KPTS/M/2012;

8. Surat Keputusan Menteri Pekerjaan Umum Nomor 26JKPTSIM12014 tanggal 3 Februari 2014tentang Pengangkataa Pejabat Struktural Eselon ill dan TV di Lingkungan Direktorat JenderaJBina Marga;

9. Surat Keputusan Direktur Jenderal Billa Marga Nomor 08.a/KPTSfDb/2014 tanggal 27 Maret2014 tentang Penunjukan/Pengangkatan Pejabat/Pegawai Project Management Unit (PMU)Western lndonesiaNational Road Improvement Project (WINRIP);

10. Contract for Consulting Services for Technical Assistance for Core Team Consultants (CTC)WTNRlP No: 06-29/CTCIrAILN/8043J1112, tanggal 5 November 2012;

11. Peraturan Menteri Keuangan R1Nomor nIPMk02f2013 tentang Stander Biaya Masukan TahunAnggaran 2014;

12: Kerangka Acuan Kerja Pemantauan Pihak KetigalIhird Party Monitoring (TPM).

MENIMBANG:a. Bahwa pada kegiatan Pelaksanaan Program Western Indonesia National Roads Improvement

Project (WINRIP) Loan ffiRD No. 8043-ID, sesuai dengan Loan Agreement, terdapatkesepakatan -untuk memerangi kemungkinan adanya Korupsi, Kolusi dan Nepotisme (KKN)melalui komponen Rencana Tindak. Anti Korupsi atau Anti-Corruption Action Plan (ACAP)melalui peningkatan transparansi dan meningkatkan peran serta masyarakat

b. Bahwa untuk maksud tersebut di atas perlu dibentuk Pemantau .Pihak. Ketiga/Third PartyMonitoring (TPM) sebagai Pemantau dalam proses pelaksanaan konstruksi,

c. Bahwa Tim TPM yang namanya tercantum dalam lampiran Surat Keputusan ini dipandang cakapdan memenuhi syarat untuk diserahi tugas tersebut.

d. Bahwa untuk maksud tersebut, perlu ditetapkan dengaa Surat Keputusan Direktur Bina Program,Direktorat Jenderal Bina Marga

SURATXEPUTUSANDIRJOCrURBINA PROGRAM

DIREKTORAT JENDERAL BINA ~GANOMOR; 0300 !~e·l{(~ts I~r f

TENTANGPEMBENTUKAN PEMANTAU PiHAK KETIGAlTHIRD PARTY MONITORING (TPM)

PADAPAKET 11 (BANTAL-MUKOMUKO) PROVlNSl BENGKULUPROGRAMW1NRIPLOANIBRD No. 8043-lD

TABUN ANGGARAN 2015

JI. Pattimura No. 20 I<ebayoran Baru-Jakarta 12110, Telp. (021) 7200281, 7398928, Fax. (021) 7201760

KEMENTERIAN PEKERJAAN UMUMDIREKTORAT JENDERAL BJNA MARGADIREKTORAT BJNA PROGRAM

Page 26: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

Tembusan disarnpaikan kepada Yth:1. Bapak Direktur Jenderal Bina Marga (sebagai laporan).2. Bapak.Direkrur Bina Pelaksanaan Wilayah I,Dirjen, Bina Marga3. Kepala Balai Besar Pelaksanaan Jalan Nasionallii Palembang,4. Kasubdit Pembiayaan danKerjasarna Lnar Negeri. Dit, Bina Program.5. Kasuhdit Sistem Pengendalian Wilayah [Dit. Binlak I/Ketua Pelaksana Hanan PMU WINRIP.6. Kasatker Pembinaan Administrssi danP2PRLN, Dit. Bina Program7. Kasaiker Pelaksanaan Jalan Nasional (PIN) Wilayah I Provinsi Bengkulu,8. PPKOL9. PMU WINRIP.10.ere WINRlP.1L Tim TPM Faket 11.12.File.

D~UR BINA PROOR<\MI&ETUAPMU WIN.RlP

: JAKARTA: Of.- APRIL 2015

DITET APKAN Dr.PADA TANGGAL

Menetapkan:Pertama : Membentuk Tim TPM untuk Paket l l (Bantal- Mukomuko)Kedua : Rincian Tugas Tim TPM adalah;

Sebelum melaksanakan tugasnya, Tim TPM (Pemantau Utama dan PemanlauAnggota) telah rnengik..uti training pembekalan yang dilakukan oleh PMU dibantuoiehCTC WINRTP.Menyediakan waktunya untuk mengikuti kegiatan pefaksanaan konstruksi seJamamasa pelaksanaan proyek.Menghadin setiap rapat koordinasi sesuai dengan undangan dari Satker!PPK terkait

- Mengamati pelaksanaan pekerjaan konstruksi dan tidak diperkenankan memberiperintah kepada PelaksanaLapangan,Mencatat dengan Unci dan. jelas apabila ada hal-hal yang menyimpang dari yangditetapkan dalam Dokurnen Teknis.

- Membuat iaporan hasil rapat dan Pemantauan kemudian menyampaikanrrya kepadaJl1ID denzan tembusan kepada Balai Besar Pelaksanaan Jalan NasionallSatkerTPPK

- tterkait,

Ketiga Segala biaya akibat dikeluarkannya Surat.Keputusan ini dibebankan kepada Contractfor Consulting Services for Technical Assistance for Core Team Consultants (CTCWINRIP) No: 06-20JCTCrrAlLN/8 043III 12, tanggal 5November 2012, sesuai denganHasil Evaluasi dan Negosiasi RAE dalam Perjanjian Kerja yang telah disetujui.

Keempat . Surat,Keputusan ini mulai berlaku sejak ditetapkan sampai dengan tanggal berakhimyamasa pelaksanaan kontrak, dengan ketentuan apabila di kemudian hari terdapatkekeliruan dalam Sura!Keputnsan ini, akan diadakan perbaikan sebagaimana rnestinya,

Memutuskan:

Page 27: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

It-. HARRIS H. BATGBAR;\. M.Eng.ScNIP. 19570421 198501 1001

DlREKTUR BINA PROGR-<\MI, KETU.\_ PM{: WINRIP

NO PAKET lNSTITUSl PROVINSI NAMA I JABAI_AN11

UniversitasDr. Muhammad Fauzi, ST., MT . Pemantau Utama -

1 (BantaJ -Bengkulu

Bengkulu Hesti Aulia Sari, ST I Pemantau AnggotaMukomuko) Hot Maria Angelina, ST I Pemantau Anggota

DAFTAR NAMAPEMANTAU PlBAKKETIGAlTHIRD PARTY MONITORING (TPM)PADA PAKET 11 (BANTAL - :\11JKOMUKO) PROVINSI BENGKULU

ROGRAM WINRIPTA1:lUN ANGGARAN 2015

. Surat Keputusan Direkiur Bma Program_(JjQfJ(6p· {f !~TS !~rY07- Aprc" ( ~(C;

LampiranNomOITanggal

Page 28: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

MENGINGAT:1. Loan Agreement of WINRIP, Loan Number 8043-JD between Republic of Indonesia and

International Bank for Reconstruction Development (IBRD) World Bank, dated December 14,2011, Schedule 2 Section IC: "The Borrower (Government of Republic of Indonesia) shallensure that the Project is carried out in accordance with the provisions of the Anti-CorruptionGuidelines and the Anu-Corruptton.Aaion Plan;

2. Lean Agreement WlNRIP, Appendix, Definition 2, "The Borrower setttng forth the actton to betaken Anti-Corruptten Action Plan (ACAP) to promote' good governance and accountabilityincluded tn Project Management Manual (P~ ";

3. Loan Agreement WINRIP, Appendix, Definition 3 about Anti-Corruption Guidelines: "TheWorld Bank's Guidelines on Preventing and Combating Fraud and Corruption in ProjectsFinanced by IBRD Loans and IDA Credits and Grants, Dated October 15, 2006 and Revised inJanuary, 20n ";

4. Projectlmplementation Plan (PIP) WINRIP Part 3.7 and Part 4, annex 10 and annex.l 1;S. Surat Keputusan Menteri Pekerjaan Umum NomOI 419IKPTSIMI2010 tanggal 21 Juli 2010

tentang Pembebasan dan Pengangkatan Pejabat Pimpinan Eselon [La di LingkunganKementerian Pekerjaan Urnum;

6. Surat Keputusan Menteri Pekerjaan Umum Nomor 418IKPTSIMI2Ql1 tanggal 23 Desember2011 tentang Pengangkatan AtasanfAtasan Langsung Kepala Satuan Kerja dan Pejabat IntiSatuan Kerja di Lingkungan Direktorat Jenderal Bina Marga Kementerian Pekerjaan Umum;

7. Sura! Keputusan Menteri Pekerjaan Umum Nomor 93/KPTS1MJ2013 tanggal 28 Februari 2013tentang Perubahan Keputusan Menteri Pekerjaan Umum Nomor 418/KPTS1M/2011, Nomor419/KPTSIM/20 11 dan Nomor 2S41KPTSlMf2012~

8. Surat Keputusan Menteri Pekerjaan Umum Nomor 26IKPTSIMf2014 tanggal 3 Februari 2014tentang Pengangkatan Pejabat Struktural Eselon ill dan N di Lingkongan Direktorat JenderalBinaMarga;

9. Surat Keputusan Direktur Jenderal Bina Marga Nomor 08.alKPTSlDb/2014 tanggal 27 Maret2014 tentang PenunjukanlPengangkatan PejabatIPegawai Project Management Unit (PMU)Western Indonesia National Road Improvement Project (WINRJP);

10. Contract for Consulting Services for Technical Assistance for Core Team Consultants (OTC)WINRIP No: 06-29fCTCrrAlLNi8043/1 112, tanggal 5 November 2012;

11. Peraturan Menteri Keuangan Rl Nomor 72/PMk 02/20 13 tentang Standar Biaya Masukan TahunAnggaran 20 14;

12: Kerangka Acuan Kerja Pemantauan Pihak KetigalThi:rdParty Monitoring (TPM).

MENIMBANG:a. Babwa pada kegiatan Pelaksanaan Program Western Indonesia National Roads Improvement

Project (WINRIP) Loan lBRD No. 8043-ID, sesuai dengan Loan Agreement, terdapatkesepakatan 'untuk mernerangi kernungkinan adanya Korupsi, Kolusi dan Nepotisme (KKN)melalui komponen Rencana Tindak Anti Korupsi atau Anti-Corruption Action Plan (ACAP)melalui peningkatan transparansi dan meningkatkan peran serta masyarakat.

b. Babwa untuk maksud tersebut eli atas perlu dibentuk Pemantau Pihak Ketiga/Third PartyMonitoring (TPM) sebagai Pemantau dalam proses pelaksanaan konstruksi.

c. Bahwa Tim TPM yang namanya tercantum dalam lampiran Surat Keputusan ini dipandang cakapdan memenuhi syarat untuk diserahi tugas tersebut

d. Bahwa untuk maksud tersebut, perlu ditetapkan dengaa SuratKeputusan Direktur Bina Program,Direktorat Jenderal Bina Marga

SURAT KEPUTUSANDIREKTUR BlNAPROGRAM

D1REKTORAT JENDERAL BINA MARGANOMOR! O?~ (~e·lt (~1'S fUll$"

TENTANGPEMBENTUKA,N PEMANTAU PIHAK KETIGAITHIRD PARTY MONITORING (TPM)

PADA PAKET 13 (SP. RUKIS- TJ. KEMUNlNG) PROVINSJ BENGKULUPROGRAM WlNRJP LOAN raan No. 8043-ID

TAHUN ANGGARAN 2015

JI. Pattimura No. 20 Kebayoran Baru-Jakarta 12110, Telp.(021) 7200281,7393928, Fax. (021) 7201760

KEMENTERJAN PEKERJAAN UMUMDIREKTORAT JENDERAL BINA MARGADIREKTORAT BINA PROGRAM

-

Page 29: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

Tembusan disampaikan kepada yth:1. Bapak:Direktur Jenderal Bina Marga (sebagai laporan).2. Bapak Direktur BinaPelaksanaan. Wilayah 1.Ditjen.Bina.Marga,3. Kepala Balai Besar Pelaksanaan Jalan Nasional III Palembeng,4. Kasubdit Pembiayaan dan Kerjasama Luar Negeri, nil Billa Program,5. Kasubdit Sistem Pengendalian Wilayah I Dit. Binlak IfKetlla~elaksanaHarian P]v11]WINRIP.6. Kasatker Pembinaan Administrasi dan P2PHLN, Di1.Bina Program.7. Kasatker Pelaksanaan Jalan Nasional (PJN) Wilayah II Provinsi Bengkulu,8. PPK06.9. PMUWINRIP.10. CTC WINRIP.n.Tim TPMPaket 13.12. File.

lr:-HARRIS H. B:A.TUBARA,M.Eng.scNIP. 1957a~Y1985011 001

.--D~~BINAPRO~

TITUA PMUWINRIP

JAK.I\RTAOJ. APRIL2015

DITETAPKAN DIPillA TANGGAL

Keempat

Ketiga

Menetapkau:Pertama : Mernbentuk Tim TPM unruk Paket 13 (Sp. Rnkis - 'Ij. Kemnning).Kedua Rincian Tugas Tim TPM adalah;

Sebelum melaksanakan tugasnya, Tim TPM (Pemantau Utama dan PernantauAnggota) telah mengikuti training pembekalan. yang dilakukan oleh PMU dibanmoleh CTC WINRIP.Menyediakan waktunya untuk mengikuti kegiatan pelaksanaan konstruksi selamamasa pelaksanaan proyek.

- Menghadiri setiap rapat koordinasi sesuai dengan undangan dari Sarker/Pf'K terkait.Mengamati pelaksanaan pekerjaan konstruksi dan tidak diperkenankan memberiperintah .kepada Pelaksana Lapangan.Mencatar dengan rinci dan jelas apabila ada hal-hal yang menyimpang dan yangditetapkan dalam Dokumen Teknis.

- Membuat Iaporan hasil rapat dan Pernantanan kemudran menyampaikannya kepadaPMU dengan tembusan kepada Balai Besar Pelaksanaan Jalan NasionaJ/SatkerlPPKterkait, ~

Segala biaya akibat dikeluarkannya Surar.Keputusan ini dibebankan kepada Contractfor Consulting Services for Technical Assistance for Core Team Consultants (CTCWJNRIP) No: 06-20/CTC/fAJLN/&043/1] 12, tanggal 5 November 2012, sesuai denganBasil Evaluasi dan Negosiasi RAB dalam Petjanjian Kerja yang telah disetujui.Surat Keputusan inimulai berlaku sejak ditetapkan sam:pai dengan tanggal berakhimyamasa kontrak pelaksanaan proyek, dengan ketentuan apabila di kernudian han terdapatkekeliruan daJam Surat Keputusan ini, akan diadakan perbaikan sebagaimana mestinya.

Memutuskan:

Page 30: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

lr. HARRIS H. BATUBARA. M.Eng.ScNIP. 19570421198501 1 001

DlREKTUR BINA PROGRAMiKETUA PMU WTh'RIP

t

NO PAKET INSTITUSl PROVINSl NAMA JABATAN13 Unrversitas

Hardiansyah, ST., MT Pemantau Utama1 (Sp. Rukis - Tj BengkuLu Bengkulu Agung Febrianto, ST Pemantau Anggota

Kemuning) Nanda Pratama, ST Pemantau Anggota

DAFTARNAMAPEMA.1'Ii AU PIHAK KETIGAffHIRD PARTY MOl\lTORING (TPM)

PADA PAKET 13 (SP. RUKIS - TJ. KEMUNlNG) PROVINSI BENGKULUROGRAM WlNRIP

TAHUN ANGGARAN2015

Surat Keputusan Direktur Bina Program,(};L~gI~·lt /'ff:f> (W(r;

. 0:2-. Afri ( 't.o(~

Lampi ranNornorTanggaJ

Page 31: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas

Laporan Pelaksanaan Interview Pemilihan TPM Paket 11: Bantal – Mukomuko danPaket 13: Sp. Rukis – Tj. Kemuning, Provinsi Bengkulu Desember

DOKUMENTASIPELAKSANAAN INTERVIEW PEMILIHAN TPM

PAKET 11 : BANTAL – MUKOMUKO DAN PAKET 13: SP. RUKIS – TJ. KEMUNINGPROVINSI BENGKULU

BENGKULU, 22 DESEMBER 2014

Page 32: Report No: 14-06/23dms.winrip-ibrd.com/data/C1_BCENR/C1.13_SpRukis... · 1 Muhammad Fauzi, ST., MT Universitas Bengkulu Dosen Universitas Bengkulu 2 Hardiansyah, ST., MT Universitas