JMK UMK IV DAFTAR ISI DAFTAR ISI .............................................................. ............................................................. 1 RINGKASAN .................................................... .............................................................. ....... 3 1. .................................................INFORMASI PROYEK ...................... 4 1.1 Nama Proyek ........................................................ ....................................................... 4 1.2 Lokasi Proyek ........................................................ ...................................................... 4 1.3Pemilik Proyek ............................................................ ................................................ 4 1.4 Pelaksana Supervisi Konstruksi ............................................. .................................... 4 1.5 Ruang Lingkup Supervisi Proyek ................................................. ............................. 5 1

description

wtwtw

Transcript of Rekonduktoring Sla 016 Maret'15

JMK UMK IV

JMK UMK IV

DAFTAR ISIDAFTAR ISI ........................................................................................................................... 1RINGKASAN ......................................................................................................................... 31. INFORMASI PROYEK ...................... 41.1 Nama Proyek ............................................................................................................... 41.2 Lokasi Proyek .............................................................................................................. 41.3Pemilik Proyek ............................................................................................................ 41.4Pelaksana Supervisi Konstruksi ................................................................................. 41.5Ruang Lingkup Supervisi Proyek .............................................................................. 51.6Lingkup Penugasan Pelaksanaan Supervisi Konstruksi ............................................ 52. KEMAJUAN PEKERJAAN .......................................................................................... 72.1 Evaluasi Pekerjaan Proyek Rekonduktoring SUTT 150 kV Dumai - Duri Sirkit 1 dan 2 (59 Kmr) dari ACSR 1 X 240 mm2 dengan HCLS Konduktor yang kemampuannya 2 kali existing ................................................................. 72.1.1 Data Proyek ........................................................................................................ 72.1.2 Monitoring Pelaksanaan Pekerjaan ....................................................................... 72.1.3 Progres Pekerjaan ................................................................................................ 112.1.4 Kendala dan Tindaklanjut ................................................................................... 112.1.5 Realisasi Manmonth dan Biaya Tunai ................................................................. 112.2 Evaluasi Pekerjaan Proyek Penggantian Peralatan Bay penghantar 150 kV Dumai Duri Sirkit 1 & 2 di Gardu Induk Dumai dan Gardu Induk Duri .............................................................................................................................. 122.2.1 Data Proyek ........................................................................................................ 122.2.2 Monitoring Pelaksanaan Pekerjaan ..................................................................... 122.2.3 Progress Pekerjaan .............................................................................................. 162.2.4 Kendala dan Tidak Lanjut ................................................................................... 162.2.5 Realisasi Manmonth dan Biaya Tunai ................................................................ 162.3 Evaluasi Pekerjaan Proyek Pengadaan dan pemasangan Bay Trafo 150 kV dan Kubikel 20 kV serta Pemasangan Trafo 150/20 kV di Gardu Induk Dumai ................................................................................................................. 172.3.1 Data Proyek ........................................................................................................ 172.3.2 Monitoring Pelaksanaan Pekerjaan ..................................................................... 172.3.3 Progress Pekerjaan ............................................................................................. 292.3.4 Kendala dan Tidak Lanjut ................................................................................... 292.3.5 Realisasi Manmonth dan Biaya Tunai ................................................................ 29LAMPIRAN

Struktur Organisasi

Kurva S

Photo DokumentasiRINGKASAN

Progres pekerjaan Rekonduktoring SUTT 150 kV Dumai Duri Sirkit 1 & 2 (59 Kmr) dari ACSR 1 x 240 mm2 dengan HCLS konduktor yang kemampuannya 2 kali existing, Penggantian Peralatan Bay Penghantar 150 kV Dumai Duri Sirkit 1 & 2 di Gardu Induk Dumai dan Gardu Induk Duri dan Pengadaan dan Pemasangan Bay Trafo 150 kV dan Kubikel 20 kV serta Pemasangan Trafo 150/20 kV di Gardu Induk Dumai sebagai berikut :

1. Rekonduktoring SUTT 150 kV Dumai Duri Sirkit 1 & 2 (59 Kmr) dari ACSR 1 x 240 mm2 dengan HCLS konduktor yang kemampuannya 2 kali existing adalah sebesar 100% .2. Penggantian Peralatan Bay Penghantar 150 kV Dumai Duri Sirkit 1 & 2 di Gardu Induk Dumai dan Gardu Induk Duri sebesar 100%3. Pengadaan dan Pemasangan Bay Trafo 150 kV dan Kubikel 20 kV serta Pemasangan Trafo 150/20 kV di Gardu Induk Dumai adalah sebesar 80,928%.Medan, Maret 20151. INFORMASI PROYEK

1.1. Nama Proyek

PEMBANGUNAN TRANSMISI DAN GARDU INDUK TERSEBAR DI PULAU SUMATERA

1.2. Lokasi Proyek

Lokasi Proyek Pembangunan Transmisi dan Gardu Induk berada di Sumatera.

1.3. Pemilik Proyek

PT PLN (Persero) Penyaluran dan Pusat Pengatur Beban Sumatera.1.4. Pelaksana Supervisi Konstruksi Proyek

Kantor Induk

PT PLN (Persero) JASA MANAJEMEN KONSTRUKSI

Jalan Slamet No. 1 Candi Baru

Semarang 50232Kantor Unit Supervisi KonstruksiPT PLN (Persero) Jasa Manajemen Konstruksi

Unit Manajemen Konstruksi IVJl. K.L Yos Sudarso KM. 8,5, Tanjung Mulia, Medan 20241Telp : (061) 6645621, 6645619; Facsimile (061) 66456201.5. Ruang Lingkup Supervisi Proyek NoNama KontrakNo. Kontrak/Tgl.

1.Rekonduktoring SUTT 150 kV Dumai -Duri Sirkit 1 dan 2 (59 kmr) ACSR 1 x 240 mm2 dengan HCLS konduktor yang kemampuannya 2 kali existing 006.PJ/611/P3BS/2013, tanggal 22 Maret 2013

2Penggantian Peralatan Bay Penghantar 150 kV Dumai Duri Sirkit 1 & 2 di Gardu Induk Dumai dan Gardu Induk Duri045.PJ/611/UPTPKU/2012, tanggal 23 Oktober 2012

3Pengadaan dan Pemasangan Bay Trafo 150 kV dan Kubikel 20 kV serta Pemasangan Trafo 150/20 kV di Gardu Induk Dumai046.PJ/611/UPTPKU/2012, tanggal 24 Oktober 2012

1.6 Lingkup Penugasan Pelaksanaan Supervisi Konstruksi

Berdasarkan Surat Penugasan dari PT PLN (Persero) Penyaluran dan Pusat Pengatur Beban Sumatera No. 016.SPG/611/P3BS/2013 tanggal 8 Oktober 2013, lingkup penugasan pelaksanaan supervisi konstruksi meliputi :

a. Membantu mereview gambar pelaksanaan sipil dan elektro mekanik dan schedule kerja (Kurva S)b. Melakukan evaluasi rencana kerja dan pelaksanaan secara berkala c. Melakukan evaluasi terhadap persiapan yang dilakukan oleh Kontraktor sebelum pelaksana pekerjaan, yang meliputi kebutuhan SDM, peralatan kerja yang digunakan, kesesuaian kualitas dan kuantitas material sehingga tidak menyimpang dari spesifikasi teknis dan gambar - gambar kerja sesuai kontrak.

d. Melaksanakan pengawasan mutu, prosedur kerja dan hal hal teknis lainnya yang berkaitan dengan pelaksanaan pekerjaan, baik pekerjaan sipil maupun elektro mekanik agar sesuai dengan spesifikasi kontrak.

e. Mengawasi, Mengevaluasi dan memberikan persetujuan laporan progress fisik pekerjaan yang diterbitkan oleh kontraktor.

f. Memberikan usulan dan rekomendasi apabila terdapat ketidaksesuaian teknis dan kontraktual dalam pelaksanaan pekerjaan dilapangan.g. Memberikan teguran secara langsung kepada kontraktor apabila terdapat permasalahan di lapangan yang perlu segera ditidaklanjuti (site metters)h. Melaporkan permasalahan permasalahan yang ditemukan dilapangan baik yang menyangkut teknis maupun sosiali. Ikut terlibat dalam pelaksanaan pengujian material di pabrikan (FAT), bila diperlukan.j. Melaksanakan pemeriksaan material di lokasi pekerjaan bersama Direksi Pekerjaan dan Penyusunan Berita Acara Pemeriksaan Materialk. Mengawasi pelaksanaan Final Check bersama Direksi Pekerjaan dan menyusun Berta Acara Final Checkl. Mengawasi pelaksanaan pengujian individu dan fungsi peralatan serta ikut menandatangani Berita Acara Pengujian Peralatan.m. Ikut terlibat dalam pelaksanaan komissioning sampai diterbitkannya SLOn. Memeriksa dan melakukan verifikasi terhadap pending item list yang disusun oleh kontraktor serta mengawasi perbaikan dan penyelesaiannyao. Memeriksa, mengevaluasi serta memberikan rekomendasi dari gambar hasil pelaksanaan (As built Drawing) yang disampaikan oleh kontraktor p. Membantu persiapan dalam pelaksanaan Serah Terima Proyek q. Memberikan rekomendasi terhadap perubahan ruang lingkup pekerjaan r. Mengkoordinasi pelaksanaan rapat rapat pekerjaan konstruksi secara berkalas. Menunjuk koordinator lapangan dan supervisor yang cukup jumlahnya dan kompeten sesuai grup kerjat. Melaksanakan pengawasan K32. KEMAJUAN PEKERJAAN

2.4 EVALUASI PELAKSANAAN PROYEK REKONDUKTORING SUTT 150 kV DUMAI - DURI SIRKIT 1 DAN 2 (59 KMR) DARI ACSR 1 X 240 MM2 DENGAN HCLS KONDUKTOR YANG KEMAMPUANNYA 2 KALI EXISTING 2.1.1 Data Proyek :Pemberi kerja

: PT PLN (Persero) P3BS UPT PEKAN BARUNomor Kontrak

: 006.PJ/611/P3BS/2013Kontraktor

: KSO PT CITICON ADHI NUGRAHA PT CITACONTRACNilai Kontrak

: Rp. 83.266.189.083,-

Proyek Berakhir: 21 Maret 2013Amandemen I

: 1.AMD/611/P3BS/2013, tanggal 13 Mei 2013Amandemen II

: 2.AMD.006.PJ/611/P3BS/2014, tanggal 19 Maret 2014 s/d 04 Juni 20142.1.2 Monitoring Pelaksanaan PekerjaanNO.URAIAN PEKERJAANQuantitySatBobot kontrak (%) PROCUREMENT INLAND TRANSPORTATION SIPIL ERECTION TOTAL

Bulan lalu Bulan ini s/d Bulan ini Bulan lalu Bulan ini s/d Bulan ini Bulan lalu Bulan ini s/d Bulan ini Bulan lalu Bulan ini s/d Bulan ini

Bobot realisasiBobot terpasang

Bobot (%) Bobot (% ) Bobot (% ) Bobot (% ) Bobot (% ) Bobot (% ) Bobot (% ) Bobot (% ) Bobot (% ) Bobot (% ) Bobot (% ) Bobot (% )

1CONDUCTORS, INCLUDING ALL JOINT AND JUMPER CONNECTIONS

1.1Six single line conductors of High Capacity Low Sag (HCLS) Aluminium Conductor (curent carrying is approx. Twice current carrying capacity of single ACSR Hawk)55,80Route km80,339071,15760,000071,15761,12590,00001,12590,00000,00000,00008,05550,00008,055580,339080,3390

1.2Two earthwire conductor GSW 55 mm20,00Route km0,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

1.3Set of three single High Capacity Low Sag (HCLS) Aluminium Conductor downleads to substation gantry (100 m), excluding low duty inverse insulator sets 120 kN, including thermal high temperature tap connectors for dropper to substation equipment, to double4,00Sets0,56280,44660,00000,44660,00410,00000,00410,00000,00000,00000,11200,00000,11200,56280,5628

1.4Set of single GSW 55 mm2 earthwire conductor to substation gantry and low level gantry including all fittings0,00Sets0,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

1.5Armour rod for line conductors of High Capacity Low Sag (HCLS) Aluminium Conductor828,00Sets1,07110,94670,00000,94670,00560,00000,005570,00000,00000,00000,11880,00000,11881,07111,0556

SUB. TOTAL 181,972972,55091,13560,00008,286481,972981,9574

2DAMPING SYSTEMS : VIBRATION DAMPERS AND CONDUCTOR SPACERS

2.1Line conductor vibration damper for High Capacity Low Sag (HCLS) Aluminium Conductor2.079,00 Sets2,27711,95760,00001,95760,01680,00000,016780,00000,00000,00000,30270,00000,30272,27712,2771

2.1aLine conductor vibration damper for High Capacity Low Sag (HCLS) Aluminium Conductor9,00 Sets0,00980,00000,00850,00850,00000,00010,000070,00000,00000,00000,00000,00120,00120,00980,0098

2.2Earthwire conductor vibration damper for GSW 55 mm20,00Sets0,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

SUB. TOTAL 22,28691,96610,01680,00000,30402,28692,2869

3INSULATOR STRINGS SETS AND EARTH CONDUCTOR ATTACHMENTS, COMPLETE WITH ALL FITTINGS BETWEEN TOWER AND CONDUCTORS

3.1aSingle suspension string set (use existing insulator)0,00Sets0,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

3.1bClamp set for single HCSL Aluminium Conductor at suspension insulator existing 120 kN 828,00Sets1,08440,94670,00000,94670,00840,00000,00840,00000,00000,00000,12930,00000,12931,08441,0687

3.2aSingle tension string set (use existing insulator)0,00Sets0,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

3.2bClamp set for single HCSL Aluminium Conductor at tension insulator existing 120 kN 324,00Sets4,30404,24940,00004,24940,00330,00000,00330,00000,00000,00000,05130,00000,05134,30404,3040

3.2b1Clamp set for single HCSL Aluminium Conductor at tension insulator existing 120 kN 24,00Sets0,24000,00000,23600,23600,00000,00020,00020,00000,00000,00000,00000,00380,00380,24000,2400

3.3aPilot insulator for jumper insulator string set 120 kN MIN. 4,250 mm creepage distance6,00Sets0,01800,01170,00000,01170,00440,00000,00440,00000,00000,00000,00190,00000,00190,01800,0180

3.3a1Pilot insulator for jumper insulator string set 120 kN MIN. 4,250 mm creepage distance3,00Sets0,00890,00000,00590,00590,00000,00210,00210,00000,00000,00000,00000,00100,00100,00890,0089

3.3bClamp set for single HCSL Aluminium Conductor at pilot insulator jumper existing 120 kN 6,00Sets0,07970,07870,00000,07870,00010,00000,00010,00000,00000,00000,00100,00000,00100,07970,0797

3.3b1Clamp set for single HCSL Aluminium Conductor at pilot insulator jumper existing 120 kN 3,00Sets0,01030,00000,00980,00980,00000,00000,00000,00000,00000,00000,00000,00050,00050,01030,0103

3.4aSingle tension inverse insulator string set (use existing insulator)0,00Sets0,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

3.4bClamp set for single HCSL Aluminium Conductor at sigle tension inverse insulator existing 120 kN 12,00Sets0,15940,15740,00000,15740,00020,00000,00020,00000,00000,00000,00190,00000,00190,15940,1594

3.5Earthwire suspension clamps for GSW 55 mm20,00Sets0,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

3.6Earthwire tension clamps for GSW 55 mm20,00Sets0,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

SUB. TOTAL 35,90495,69560,01860,00000,19075,90495,8892

4SURVEY AND TOWER ALOCATION

4.1Check survey including checking tower type and position, check for tower condition, Complete clearance of a strip of land concentric with the transmission line route 10 m left side and 10 m right side.55,80Route km0,52960,00000,00000,00000,00000,00000,00000,00000,00000,00000,52960,00000,52960,52960,5296

SUB. TOTAL 40,52960,00000,00000,00000,52960,52960,5296

5.MISCALLENEOUS STELL, CONDUCTORS, SPARE PART ACCESORIES, AND INSULATOR WORK PRICES FOR STRENGTHENING TOWER INCLUDING DESIGN

5.1Structural mid stell1,644 Ton0,05780,00000,04830,04830,00000,00550,00550,00000,00000,00000,00000,00390,00390,05780,0578

5.2Structural HT Stell14,839 Ton0,48610,00000,43620,43620,00000,04990,04990,00000,00000,00000,00000,00000,00000,48610,0000

5.3Disc Insulator 120 kN min. 4,250 mm creepage distance497,00Pcs0,32850,30120,00000,30120,01670,00000,01670,00000,00000,00000,01060,00000,01060,32850,0423

5.4Counter weight500,00kg0,35620,33730,00000,33730,00170,00000,00170,00000,00000,00000,01730,00000,01730,35620,0962

5.5Conductors of High Capacity Low Sag (HCLS) Aluminium Conductor (current carrying capacity is approx. twice current carrying capacity of single ACSR Hawk)1,00drum (1000 m)0,22240,00000,21250,21250,00000,00990,00990,00000,00000,00000,00000,00000,00000,22240,0000

5.6Mid Span Joint for High Capacity Low Sag (HCLS)24,00Pcs0,30690,30670,00000,30670,00020,00000,00020,00000,00000,00000,00000,00000,00000,30690,0000

5.7Tension Clamp for High Capacity Low Sag (HCLS)24,00Pcs0,30710,30670,00000,30670,00040,00000,00040,00000,00000,00000,00000,00000,00000,30710,0000

5.8Suspension Clamp for High Capacity Low Sag (HCLS)12,00Pcs0,01270,01250,00000,01250,00020,00000,00020,00000,00000,00000,00000,00000,00000,01270,0000

5.9Repair Sleeve for High Capacity Low Sag (HCLS)48,00Pcs0,27040,26960,00000,26960,00080,00000,00080,00000,00000,00000,00000,00000,00000,27040,0000

SUB. TOTAL 52,34812,23100,08530,00000,03182,34810,1963

6PROVOSIONAL SUM FOR MISCELLANEEOUS SLOPE PROTECTION AND THE BEAM WORKS (TO BE APPLIED AFTER INTRUCED BY ENGINEER)

6.1Stone masory0,00m30,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

6.2Reinforced concrete for Tie Biem0,00m30,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

6.3Retaining Wall (Reinforced Concrete K225)0,00m30,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,00000,0000

SUB. TOTAL 60,00000,00000,00000,00000,00000,00000,0000

7.0DISMANTLING MATERIAL AND ACCESSORIES / GOODS, TO SUPPLY DRUMS FOR CONDUCTOR AND CASES FOR INSULATOR, HARDWARE & FITTING AND PUT IN THE PLN'S STORAGE AT GI SUTAMI UPT TANJUNG KARANG

7.1Dismantling existing 2 cct 1 x hawk conductors55,80kmr2,92471,57630,00001,57631,16080,00001,16080,00000,00000,00000,18770,00000,18772,92472,9247

7.2Dismantling disk insulator (if any)310,00Pcs0,67830,00000,00000,00000,61570,00000,61570,00000,00000,00000,06260,00000,06260,67830,6783

7.3Dismantling hardware & fitting and accessories of conductors165,00Towers1,18410,77680,00000,77680,34960,00000,34960,00000,00000,00000,05770,00000,05771,18411,1841

SUB. TOTAL 74,78712,35312,12600,00000,30794,78714,7871

8.0WARE-HOUSE FOR STORAGE OF DISMANTLING PREVIOUS 150 kV TRANSMISSION MATERIAL

8.1Open storage with roof (Stell structure construction with concrete floor) 1.095,00 m21,03111,03110,00001,03110,00000,00000,00000,00000,00000,00000,00000,00000,00001,03111,0311

8.2Ware-house with roof (Stell structure construction with concrete floor including brickwall and stell gate) (Sutami substation)240,00m20,48430,48430,00000,48430,00000,00000,00000,00000,00000,00000,00000,00000,00000,48430,4843

8,3Partisi Ware-House with roof (including acessories and cctv)1,00lot0,65530,00000,65530,65530,00000,00000,00000,00000,00000,00000,00000,00000,00000,65530,6553

SUB. TOTAL 82,17061,51530,00000,00000,00002,17062,1706

T O T A L100,000086,31203,38250,00009,6502100,00097,8169

2.1.3 Progress PekerjaanTotal Progress Pekerjaan sampai dengan bulan Maret 2015 adalah 100 %.2.1.3 Kendala dan Tindak LanjutKENDALA :

Copy Amandemen pekerjaan tambah kurang belum ada diserahkan ke PT PLN (Persero) JMK UMK IVTINDAK LANJUT :

Diharapkan direksi pekerjaan menyerahkan copy amandemen ke PT PLN (Persero) JMK UMK IV2.1.5Realisasi Manmonth dan Biaya Tunai h Realisasi Manmonth Rencana Manmonth SLA 016.SPG/611/P3BS/2013 adalah sebesar 27,36 M/MRealisasi Manmonth Bulan Februari 2015 adalah sebesar 0,92 M/MTotal penggunaan Manmonth SLA 016.SPG/611/P3BS/2013 sampai bulan Februari 2015 adalah sebesar 55,60 M/M Realisasi Biaya Tunai Rencana Biaya Tunai SLA 016.SPG/611/P3BS/2013 adalah Sebesar Rp.897.834.000,-Penambahan Realisasi Biaya Tunai Bulan Februari 2015 akibat pengalihan adalah sebesar Rp.137.460.995,-Total penggunaan Biaya Tunai sampai bulan Februari 2015 adalah sebesar Rp.420.191.317.-2.2 EVALUASI PEKERJAAN PROYEK PENGGANTIAN PERALATAN BAY PENGHANTAR 150 KV DUMAI DURI SIRKIT 1 & 2 DI GARDU INDUK DUMAI DAN GARDU INDUK DURI2.2.1 Data Proyek :Pemberi kerja

: PT PLN (Persero) P3BS UPT PEKAN BARUNo. Kontrak

: 045.PJ/611/UPTPKU/2012, tanggal 23 Oktober 2012Kontraktor

: PT RIANDA USAHA MANDIRINilai Kontrak

: Rp. 5.899.886.850,- (termasuk PPN 10 %)Proyek Berakhir: 19 Agustus 2013Amandemen I

: 082.6.ADD.PJ/611/UPTPKU/2013, tanggal 23 Juli 2013 s/d 30 Januari 2014

Amandemen II

: 003.6.ADD.PJ/611/UPTPKU/2014, tanggal 29 Januari 2014 s/d 01 Mei 20142.2.2 Monitoring Pelaksanaan PekerjaanNoLINGKUP KERJAANSATVOLKontrakRealisasi

pengadaan materialPondasi/Pekerjaan SipilPembongkaran dan Pemasangan JasaVOLpengadaan materialVOLPondasi/Pekerjaan SipilVOLPembongkaran dan Pemasangan Jasa

BOBOTBOBOTBOBOTBOBOTBOBOTBOBOT

APEKERJAAN PERSIAPAN UNTUK KEDUA GARDU INDUK :

1 Pengukuran / Persiapan / Pembersihan lapangan. ls 2.00 - 0.2113 - 2.00 0.2113

2 Pemasangan Direksi Keet. m2 24.00 - 0.8008 - 24.00 0.8008

3 Sondir Boring. ttk 2.00 - 0.2781 - 2.00 0.2781

BPERALATAN KOPEL BAY 150 KV :

1

150 kV Circuit Breaker, 3150 A, 40 kA/3s with 3 (three) motor spring opearation mechanism type FSA for 1-pole operation. Creepage Distance 31 mm/kV set

4.00

36.3324

-

4.00

36.3324

--4.001.8537

(Without Steel Structure/Use the existing structure, Include gas SF6 & accessories).

1.8537

2 150 kV Disconnecting Switch, 3 pole center break with earthing switch 1600 A, 40 kA, 50 Hz, Creepage Distance 31 mm/kV set 4.00 13.3466 - 4.00 13.3466 4.00

- - 1.5571

(Include asessoris, Without Steel Structure/Use the existing structure) 1.5571

3 150 kV Current Transformer, 800-1600/1/1 A, 1000-2000/1/1 A, 31.5 kA/1s, Creepage Distance : 31 mm/kV. unit 12.00 25.8479 - 12.00 25.8479 12.00

- - 2.6693

(Without Steel Structure/Use the existing structure, Include asessoris) 2.6693

4 Lampu merkuri 1x250 watt lengkap untuk switchyard. unit 4.00 0.5190 - 0.1483 4.00 0.5190 - - 4.00 0.1483

(Pra-komisioning (Uji individu) Peralatan HV 150 kV Circuit Breaker, Disconnecting Switch, Current Transformer) lot (1.00) - - (1.2976) - - - - (1.00) (1.2976)

C STRUCTURE, HV KONEKTOR, ISOLATOR SET, KONDUKTOR BUSBAR, PENTANAHAN dan HAL :

1 Konduktor ACSR 2 x 240 m2 u/Cross Bar Bay Line 150 KV. m

Konduktor AAC 2 x 400 m2 u/Cross Bar Bay Line 150 KV. m 720.00 0.5873 - 720.00 0.5873 - -

2 Konduktor ACSR 1 x 435 m2 u/Jumper material Bay Line 150 KV. m

Konduktor AAC 1 x 850 m2 u/Jumper material Bay Line 150 KV. m 800.00 1.1122 - - 800.00 1.1122 - - 800.00 -

3 Tensioner/spacer uk. 2 x konduktor (cross bar) bh 48.00 0.7563 - - 48.00 0.7563 - -

4 Bolted tipe HV konektor dari Bus Line sampai ke peralatan HV, yang terdiri dari : lot

- Dead End 2 x 240 mm for Single Tension string isolator. bh

a Dead End 2 x 400 mm for Single Tension string isolator. bh 24.00 2.2244 - - 24.00 2.2244 - - - -

- Dead End 1 x 435 mm for Single Suspension string isolator. bh

b Dead End 1 x 850 mm for Single Suspension string isolator. bh 12.00 1.1122 - - 12.00 1.1122 - - - -

- T Clamp 2 x 240 mm2 to 1 x 435 mm2 (dari Konduktor PHT ke CVT/PT & dari Cross Bar ke DS Bus/Paralel Group). bh

c T Clamp 1x 310 mm2 to 1 x 850 mm2 (dari Konduktor PHT ke LA) bh 12.00 0.2861 - - 12.00 0.2861 - - - -

- T Clamp 1 x 435 mm2 to 1 x 435 mm2 (dari LA ke Jumper PHT ke CVT/PT). bh

d T Clamp 2 x 400 mm2 to 1 x 850 mm2 (Dari cross bar ke DS bus). bh 12.00 0.2861 - - 12.00 0.2861 - - - -

e T Clamp 2 x 630 mm2 to 1 x 850 mm2 (Dari Main Bus A ke DS 1 dan main bus B ke DS 2). bh 24.00 0.5721 - - 24.00 0.5721 - - - -

- Paralel Group 1 x 435 mm2 to 2 x 435 mm2 (To DS Bus 1 & DS Bus 2) bh

F Paralel Group 1 x 850 mm2 (DS 1 to DS 2 dan droper LA to CVT) bh 18.00 0.4504 - - 18.00 0.4504 - - - -

- Clamp Connector u/ Material Bay Line 150 kV, uk. 435 mm bh

g Clamp Connector u/ Material Bay Line 150 kV, uk. 850 mm bh 156.00 4.3376 - - 156.00 4.3376 - - - -

5 Adapter dan Steel Support CB (GI DURI) set 1.00 0.6561 - 1.00 0.6561 - - - -

6 Adapter dan Steel Support CB (GI DUMAI) set 1.00 0.6561 - - 1.00 0.6561 - - - -

D DUCT KABEL, KABEL KONTROL DAN AKSESORISNYA.

1 Kabel kontrol lengkap dengan terminal & asessoris lot 1.00 - 0.1390

a. NYCY 12 x 2,5/2,5 mm2. m 500.00 0.6951 - - 500.00 0.6951 - - 1.00 0.1390

b. NYCY 4 x 4/4 mm2. m 500.00 0.5098 - - 500.00 0.5098 - - -

c. NYCY 4 x 2.5/2.5 mm2. m 500.00 0.2781 - - 500.00 0.2781 - - -

- -

Transportasi dan asuransi sebesar dari harga material 1.00 3.0740 1.00 1.00 3.0740

Jumlah

Grend Total 90.5659 1.2902 8.1439 90.5659 1.2902 8.1439

Tingkat Penyelesaian/ Kemajuan Seluruh Pekerjaan Kontrak 100.0000 Realisasi 100.0000

2.2.3 Progress PekerjaanTotal Progress Pekerjaan sampai bulan Maret 2015 adalah sebesar 100%

2.2.4 Kendala dan Tindak LanjutNihil 2.2.5Realisasi Manmonth dan Biaya Tunai h Realisasi Manmonth Rencana Manmonth SLA 016.SPG/611/P3BS/2013 adalah sebesar 27,36 M/MRealisasi Manmonth Bulan Februari 2015 adalah sebesar 0,88 M/M Total penggunaan Manmonth SLA 016.SPG/611/P3BS/2013 sampai bulan Februari 2015 adalah sebesar 55,60 M/M Realisasi Biaya Tunai Rencana Biaya Tunai SLA 016.SPG/611/P3BS/2013 adalah Sebesar Rp.897.834.000,-Realisasi Biaya Tunai Bulan Februari 2015 adalah sebesar Rp.0,-Total penggunaan Biaya Tunai sampai bulan Februari 2015 adalah sebesar Rp.61.991.961,-2.3 EVALUASI PEKERJAAN PROYEK PENGADAAN DAN PEMASANGAN BAY TRAFO 150 KV DAN KUBIKEL 20 KV SERTA PEMASANGAN TRAFO 150/20 KV DI GARDU INDUK DUMAI2.3.1 Data Proyek :Pemberi kerja

: PT PLN (Persero) P3BS UPT PEKAN BARU

No. Kontrak

: 046.PJ/611/UPTPKU/2012, tanggal 24 Oktober 2012Kontraktor

: KSO PT MUSTIKA POWERINDO PT DAYUZA DASA DIVANilai Kontrak

: Rp. 7.412.631.374,78,- ( Termasuk PPN 10 % )Proyek Berakhir: 20 Agustus 20132.3.2 Monitoring Pelaksanaan PekerjaanNoURAIAN PEKERJAANSATVOLITEM PEKERJAANREALISASI KEMAJUAN PEKERJAAN

PengadaanSipilPemasanganTotal bobot (%)BULAN LALU BULAN INI TOTAL BOBOT

Penga daanSipilPemasanganTotal BobotPenga daanSipilPemasanganTotal BobotPenga daanSipilPemasanganTotal Bobot

BobotBobotBobot

(%)(%)(%)%%%(%)%%%(%)%%%(%)

APEKERJAAN PERSIAPAN :Lot1

1 Pengukuran / Persiapan / Pembersihan lapangan. ls 1,000,0000,0220,0000,022-0,022-0,022---0,022-0,022

2 Pemasangan Direksi Keet. m2 12,00 0,0000,1400,0000,140 - 0,140 - 0,140 - - - 0,140 - 0,140

3 Sondir Boring. ls 2,00 0,0000,0890,0000,089 - 0,089 - 0,089 - - - 0,089 - 0,089

BPERALATAN 150 KV BAY TRAFO 150/20 KV :Lot1

1 Trafo Daya 150/20 kV unit 1,00 0,0002,1530,4822,635 - 2,153 - 2,153 - - - 2,153 - 2,153

2 PMT (CB), 3150 Amp, breaking capacity 1600 A, 40 kA/3s, with 3 (three) motor spring opearation mechanism type FSA for 3-pole operation, Creepage Distance 31 mm/kV. set 1,00 6,5290,1370,1746,8406,529 0,1370,139 6,805 - -6,5290,1370,1396,805

(Include steel structure, gas SF6 & accessories).

3 PMS (DS) Bus 150 kV, 3 pole center break without earthing switch 2000 A, 40 kA, 50 Hz, Creepage Distance 31 mm/kV. set 2,00 3,8580,5250,2854,669 - 0,525 - 0,525 - - - 0,525 - 0,525

(Include steel structure & accessories).

4 Trafo Arus (CT) 150 kV, Creepage Distance 31 mm/kV, burden 40 VA, Single phase, 31.5 kA/1s , 150-300/1-1; 1000-2000/1-1. unit 3,00 4,8970,4110,0515,3591,616 0,4110,041 2,068- - --1,6160,4110,0412,068

(Include steel structure & accessories).

5 NCT 150 kV, 150-300/1-1 Amp, terpisah dari main tank Trafo. unit 1,00 0,9790,1370,0171,134 - 0,137 - 0,137 - - - 0,137 - 0,137

(Include steel structure & accessories).

6 NCT 20 kV, Outdoor, 1000-2000/1 A (for REF). unit 1,00 0,9200,0000,0220,942 - 0,000 - - - - - - -

(Include accessories set).

7 Lightning Arrester (LA) 150 kV, metal oxide, silicone housing, line discharge class 4, 20 kA including insulating base, line + earth terminal and surge counter with leakage curent meter type excount-1, Creepage Distance : 31 mm/kV. unit 3,00 2,2260,4110,1562,793 - 0,411 - 0,411 - - - 0,411 - 0,411

(Include steel structure & accessories).

8 NGR 20 kV (300 Amp, 40 Ohm, 10 detik) included accessories u/ bay TD#3 dan pengganti NGR Bay TD#1 existing. unit 2,00 6,2920,2180,0966,6066,2920,2180,0776,587 - - - - 6,2920,2180,0776,587

9 Marshalling kiosk (MK/Join Box) untuk bay trafo. unit 1,00 0,7420,0310,0850,858 0,7420,0310,068 0,841 - -0,7420,0310,0680,841

10 Panel Kontrol & Regulating bay trafo yang terdiri dari : set 1,00 4,1550,0000,2604,4154,155 - 0,208 4,363 - 4,155 - 0,2084,363

Panel Kontrol :

a.Discrepancy Switch 4 pcs for CB & DS.

b.Push Button reset (lengkap).

c.Accessories panel lengkap.

d.Mimic diagram bay transformer lengkap.

e.Alarm & announciator group lengkap.

f.Remote/supervisory Switch lengkap.

g.Test plug facilities untuk pengukuran arus & tegangan.

h. 3 buah meter digital arus, & 1 buah meter digital tegangan

i. 1 buah meter digital MW, & 1 buah meter digital MVAr.

j.Selector switch untuk monitoring tegangan

k.Auxiliary Relay.

l.Terminal block, heating, lighting, thermostat, MCB, etc.

m.dll (untuk melengkapi lingkup pekerjaan).

Panel Regulating :

a.1 (satu) set 20 kV Voltmeter digital.

b.1 (satu) set digital tap position indicator.

c.Automatic Voltage Regulating Relays and facilities.

d.1 (satu) set manual/auto switch.

e.1 (satu) set push button control tap changer (lower/rise switch).

f.1 (satu) set digital temperatur meter.

g.dll (untuk melengkapi lingkup pekerjaan).

11 Panel Proteksi untuk bay trafo yang terdiri dari : set 1,00 4,8970,0000,2235,1204,897 - 0,178 5,075 - 4,897 - 0,1785,075

a.Differensial Relay.

b.3 P Over Current & Earth Faulth Relay.

c.2 (dua) trip circuit supervision relay.

d.Restricted Earth Faulth Relay (150 kV & 20 kV).

e.Stand by Earth Faulth Relay.

f.Tripping Relay with Reset.

g.2 (dua) Lockout Relay with Reset.

h.2 (dua) master trip with reset for each Tripping Circuit.

i.Auxiliary Relay.

j.Test plug facilities untuk setiap Relay.

k.dll (untuk melengkapi lingkup pekerjaan).

12 Kubikel Incoming 20 kV, busbar 2000 A, yang terdiri dari : set 1,00 4,6000,0000,1884,7884,600 - 0,150 4,751 - 4,6000,0000,1504,751

a. PMT 20 kV VCB, 2000 Amp, 25 kA.

b. PT Incoming 20 kV, 3 phasa.

c. Energi Meter digital.

d. CT 20 kV, 3 core, untuk pengukuran & proteksi, 1000-2000/1-1-1.

e. Relay OC/GFR (Over Current/Ground Fault Relay)

f. Trip circuit supervision.

g. 3 buah meter digital arus, & 1 buah meter digital tegangan

h. 1 buah meter digital MW, & 1 buah meter digital MVAr.

i.Selector switch untuk monitoring tegangan

j. Switch lokal, remote & supervisory.

k. LED untuk indikator tegangan.

l. Fasilitas test plug untuk pengujian Metering & Proteksi.

m. Miscell incoming lengkap.

n. Accessories 20 kV lengkap.

13 Kubikel outgoing 20 kV, busbar 2000 A, yang terdiri dari : set 4,00 14,8400,0000,65815,49814,84 - 0,13214,971- - --14,840 - 0,13214,971

a. PMT 20 kV VCB, 1250 Amp, 25 kA.

b. CT 20 kV, 2 core, untuk pengukuran & proteksi, 400-800/1-1.

c. Relay OC/GFR (Over Current/Ground Fault Relay)

d. Selector for load shedding & ter-wiring ke UFR.

e. Trip circuit supervision.

f. 3 buah meter digital arus, & 1 buah meter digital tegangan

g. 1 buah meter digital MW, & 1 buah meter digital MVAr.

h.Selector switch untuk monitoring tegangan

i. Switch lokal, remote & supervisory.

j. Auto-reclose & perlengkapannya.

k. LED untuk indikator tegangan.

l. Fasilitas test plug untuk pengujian Metering & Proteksi.

m. Miscell outgoing lengkap.

n. Accessories 20 kV lengkap.

14 Kubikel Bus Raiser 2000 Amp, 25 kA, incl. DS lengkap dengan interface. set 1,00 1,7810,0000,0821,8631,781-0,0661,846- - --1,781 - 0,0661,846

15 Kubikel Bus Coupler/Section Panel 20 kV, busbar 2000 A yang terdiri dari : set 1,00 4,0070,0000,1324,1394,007-0,1064,112- - --4,007 - 0,1064,112

a. PMT 20 kV VCB, 2000 Amp, 25 kA.

b. CT 20 kV, 2 core, untuk pengukuran & proteksi.

c. Relay OC/GFR (Over Current/Ground Fault Relay)

e. Trip circuit supervision.

f. 3 buah meter digital arus, & 1 buah meter digital tegangan

g. 1 buah meter digital MW, & 1 buah meter digital MVAr.

h.Selector switch untuk monitoring tegangan

i. Switch lokal, remote & supervisory.

j. LED untuk indikator tegangan.

k. Fasilitas test plug untuk pengujian Metering & Proteksi.

l. Equipment & Accessories 20 kV lengkap.

16 Kubikel PT (Trafo Tegangan) bus 20 kV dilengkapi dengan : set 1,00 2,078 - 0,0822,1602,078 - 0,066 2,143 - - 2,078 - 0,0662,143

a. 3 (tiga) bh Voltmeter.

b. Over Voltage & Under Voltage Relay.

c. Under Frekuensi Relay.

d. LED untuk indikator tegangan.

e. Fasilitas test plug untuk pengujian Metering & Proteksi.

f. Equipment & Accessories 20 kV lengkap. 112,00

17 Kable Power 20 kV, NA2XSY 1 x 630 mm. m 900,00 2,604 - 0,0562,6602,604 - 0,039 2,643 - 2,604 - 0,0392,643

18 Kable Support 20 kV pada TD. set 1,00 0,1190,032 - 0,150 - 0,032 - 0,032 - - - 0,032 - 0,032

(Include steel structure & accessories)

19 Terminating Indoor 20 kV (Al; Cu). bh 3,00 0,1600,0000,0070,167 - - - - - - - - - -

(Include accessories)

20 Terminating Outdoor 20 kV (Al; Cu). bh 13,00 0,9070,0000,0310,938 - - - - - - - - - -

(Include accessories)

C STRUCTURE, HV KONEKTOR, ISOLATOR SET, KONDUKTOR BUSBAR, PENTANAHAN & HAL : Lot1

1 Column type P-1, 18 m lengkap dengan mur, baut & accessories. unit 3,00 2,6711,8320,2774,7802,6711,8320,2774,780 - - - - 2,6711,8320,2774,780

2 Column type P-1, 9 m lengkap dengan mur, baut & accessories. unit 1,00 0,5940,6110,0491,2530,5940,6110,0491,253 - - - - 0,5940,6110,0491,253

3 Beam B-1 upper/lower, 14 m lengkap (mur+baut+accessoriess). unit 4,00 1,7810,0000,3872,1681,781 - 0,3872,168 - - - - 1,781 - 0,3872,168

4 GSW 55 mm lengkap dengan asessories (pada Switch Yard). m 140,00 0,0360,0000,0620,0980,036 - 0,0620,098 - - - - 0,036 - 0,0620,098

5 Konduktor AAAC 1 x 240 mm untuk jumper Perlatan bay ke Cross Bar. m 300,00 0,1340,0000,1330,2660,134 - 0,1330,266 - - - - 0,134 - 0,1330,266

6 Konduktor AAAC 2 x 630 mm untuk Main Busbar 150 kV. m 240,00 0,2780,0000,1060,3840,278 - 0,1060,384 - - - - 0,278 - 0,1060,384

7 Konduktor AAAC 2 x 240 mm untuk Cross Bar 150 kV. m 210,00 0,0930,0000,0930,1860,093 - 0,0930,186 - - - - 0,093 - 0,0930,186

8 Tensioner/spacer uk. 2 x konduktor (cross & main busbar) bh 24,00 0,1780,000 - 0,1780,178 - - 0,178 - - - - 0,178 - - 0,178

9 Single tension string isolator set lengkap dengan aksesories unit 18,00 1,3620,0000,1431,5051,362 - 0,1431,505 - - - - 1,362 - 0,1431,505

(1 renteng terdiri dari 12 disk) pada Beam.

10 Single suspension string isolator set lengkap dengan aksesories unit 3,00 0,2200,0000,0240,2450,2200,0000,0240,245 - - - - 0,220 - 0,0240,245

(1 renteng terdiri dari 12 disk) pada Beam.

11 Bolted tipe HV konektor dari Bus Line sampai ke peralatan HV. lot 1,00 1,4170,000 - 1,417 - - - - - - - - - -

Terdiri dari :

- T Clamp 2 x 630 mm to 1 x 240 mm (dari PMS/DS Bus 1 ke main busbar I). bh 3,00 0,0000,0000,000

- T Clamp 2 x 630 mm to 1 x 240 mm (dari PMS/DS Bus 2 ke main busbar II). bh 3,00 0,0000,000 -

- T clamp 2 x 240 mm to 1 x 240 mm (dari crossbar turun ke PMS Bus) bh 3,00 0,0000,000 -

- Paralel group 1 x 240 mm to 2 x 240 mm dari Bus Line ke DS. bh 3,00 0,0000,000 -

- Paralel group 1 x 240 mm to 1 x 240 mm dari LA ke Jumper CT bh 3,00 0,0000,000 -

- Clamp Connector TD, LA, CT, CB/PMT, PMS/DS & peralatan lainnya bh 30,00 0,0000,000 -

- Rel Cooper 20/24 kV, 2000 Amper pada TD, l = 2,5 m bh 4,00 0,0000,000 -

- Flexible Joint 2000 Amp u/ Rel Cooper TD bh 4,00 0,0000,000 -

- Isolator tumpu 20/24 kV u/ Rel Cooper TD bh 4,00 0,0000,000 -

12 Groun Mesh (BC 120 mm), termasuk pipa 1.5 inch, ground rood, kabel schoen 120 & klem 16 mm include pemasangan. titik 17,00 0,0000,4040,0560,460 - 0,4040,0560,460 - - - 0,4040,0560,460

13 Lampu penerangan merkuri set 2,00 0,1130,0000,0040,117 - - - - - - - - - -

D DUCT KABEL, KABEL KONTROL & AKSESORISNYA. Lot1

1 Cable duct type - 100 cm outdoor dengan tutup plat Bordess Tebal 5 mm. m 46,00 0,0001,749 - 1,749 - 1,749 - 1,749 - - - 1,749 - 1,749

2 Cable duct type - 80 cm outdoor dengan tutup plat Bordess Tebal 5 mm. m 42,00 0,0001,335 - 1,335 - 1,335 - 1,335 - - - 1,335 - 1,335

3 Cable duct type - 60 cm outdoor dengan tutup plat Bordess Tebal 5 mm. m 26,00 0,0000,358 - 0,358 - 0,358 - 0,358 - - - 0,358 - 0,358

4 Kabel kontrol lengkap dengan terminal & asessoris lot 1,00 1,5490,0000,1361,6851,549 - 0,136 1,685 - 1,549 - 0,1361,685

a. NYCY 12 x 2,5/2,5 mm m 1.200,00 0,0000,000 -

b. NYCY 4 x 4/4 mm m 800,00 0,0000,000 -

c. NYCY 4 x 2,5/2,5 mm m 200,00 0,0000,000 -

5 Hamparan coral (tinggi 20 cm) m3 156,80 0,0000,686 - 0,686 - 0,686 - 0,686 - - - 0,686 - 0,686

E GEDUNG DAN SIPIL LAINNYA.

Lot1

1 Pekerjaan Pengembangan Ruang Kubikel 20 kV

- Pembongkaran gedung GI bagian Belakang (R. Kubikel 20 kV). m 36,00 0,0000,054 - 0,054 - 0,054 - 0,054 - - - - 0,054 - 0,054

- Bongkar & Pasang Jendela Ganda Existing R. kubikel 20 kV. set 1,00 0,0000,005 - 0,005 - 0,005 - 0,005 - - - - 0,005 - 0,005

- Bongkar & Pasang Pintu Ganda Existing. set 1,00 0,0000,008 - 0,008 - 0,008 - 0,008 - - - - 0,008 - 0,008

- Timbunan tanah pembangunan pelebaran gedung (R. kubikel 20 kV), h = 1,5 m. m 84,00 0,0000,180 - 0,180 - 0,180 - 0,180 - - - - 0,180 - 0,180

- Peninggian dinding Power Cable duct type - 80 cm indoor dengan tutup plat Bordess Tebal 5 mm, coran beton besi bertulang 125 kg, h = 1,5 m. m 5,74 0,0000,264 - 0,264 - 0,264 - 0,264 - - - - 0,264 - 0,264

- Pembuatan Pondasi batu kali Dinding Gedung R. Kubikel 20 kV (h = 2 m) m 13,80 0,0000,172 - 0,172 - 0,172 - 0,172 - - - - 0,172 - 0,172

- Pembuatan Kolom Beton Bertulang Dinding R. Kubikel 20 kV (2 bh) m 1,17 0,0000,135 - 0,135 - 0,135 - 0,135 - - - - 0,135 - 0,135

- Pembuatan dinding gedung 1/2 bata (R. Kubikel 20 kV), 1 pc : 2 ps. m 103,50 0,0000,156 - 0,156 - 0,156 - 0,156 - - - - 0,156 - 0,156

- Plester & Acian dinding gedung (R. kubikel 20 kV) sisi luar & dalam. m 207,00 0,0000,258 - 0,258 - 0,258 - 0,258 - - - - 0,258 - 0,258

- Pengecatan dinding gedung (R. kubikel 20 kV) sisi luar & dalam (2 lps cat penutup, 1 lps plamir & cat dasar). m 207,00 0,0000,063 - 0,063 - 0,063 - 0,063 - - - - 0,063 - 0,063

- Pembuatan/pengecoran lantai beton tumbuk/spesi 1Pc : 3Ps : 5Kr R. Kubikel 20 kV (tebal 15 cm) m 11,20 0,0000,132 - 0,132 - 0,132 - 0,132 - - - 0,132 - 0,132

- Pemasangan Keramik lantai uk. 40 x 40 cm (R. Kubikel 20 kV) m 56,00 0,0000,129 - 0,129 - 0,129 - 0,129 - - - - 0,129 - 0,129

- Pembuatan Rangka Atap baja ringan (R. Kubikel 20 kV) m 68,00 0,0000,202 - 0,202 - - - - - - - - - -

- Pemasangan Atap genteng metal berikut Plafon Gypsum (R. Kubikel 20 kV) m 68,00 0,0000,197 - 0,197 - - - - - - - - - -

2 Pekerjaan Pembuatan Ruang Supervisor Gardu Induk

- Pembobokan Ruang PLC u/ pemasangan pintu & exhaust fan R. Battery. m 3,00 0,0000,005 - 0,005 - 0,005 - 0,005 - - - - 0,005 - 0,005

- Bongkar Pasang Exhaust fan Ruang Battery unit 1,00 0,0000,001 - 0,001 - 0,001 - 0,001 - - - - 0,001 - 0,001

- Pembuatan Pondasi batu kali Dinding Gedung R. Spv (h = 2 m) m 8,40 0,0000,105 - 0,105 - 0,105 - 0,105 - - - - 0,105 - 0,105

- Timbunan tanah pembangunan pelebaran gedung (R. Spv), h = 1,5 m. m 36,00 0,0000,077 - 0,077 - 0,077 - 0,077 - - - - 0,077 - 0,077

- Pembuatan Kolom Beton Bertulang Dinding R. Spv (2 bh) m 1,17 0,0000,135 - 0,135 - 0,135 - 0,135 - - - - 0,135 - 0,135

- Pembuatan dinding gedung 1/2 bata (R. Spv GI), 1 pc : 2 ps. m 63,00 0,0000,095 - 0,095 - 0,095 - 0,095 - - - - 0,095 - 0,095

- Plester & Acian dinding gedung (Ruang Spv) sisi luar & dalam. m 126,00 0,0000,157 - 0,157 - 0,157 - 0,157 - - - - 0,157 - 0,157

- Pengecatan dinding gedung (Ruang Spv) sisi luar & dalam (2 lps cat penutup, 1 lps plamir & cat dasar). m 126,00 0,0000,038 - 0,038 - 0,038 - 0,038 - - - - 0,038 - 0,038

- Pemasangan Pintu tunggal P1 (Kusen & Pintu set) Baru R. Spv GI set 2,00 0,0000,062 - 0,062 - 0,062 - 0,062 - - - - 0,062 - 0,062

- Pemasangan Jendela geser Ganda Baru (kusen & Kaca set) R. Spv GI set 2,00 0,0000,053 - 0,053 - 0,053 - 0,053 - - - - 0,053 - 0,053

- Pembuatan/pengecoran lantai beton tumbuk/spesi 1Pc : 3Ps : 5Kr R. Spv (tebal 15 cm) m 4,80 0,0000,057 - 0,057 - 0,057 - 0,057 - - - - 0,057 - 0,057

- Pemasangan Keramik lantai uk. 40 x 40 cm (R. Spv) m 24,00 0,0000,055 - 0,055 - 0,055 - 0,055 - - - - 0,055 - 0,055

- Pembuatan Rangka Atap baja ringan (R. Spv) m 29,75 0,0000,088 - 0,088 - - - - - - - - - -

- Pemasangan Atap genteng metal berikut Plafon Gypsum (R. Spv) m 29,75 0,0000,086 - 0,086 - - - - - - - - - -

3 Pembuatan Teras & Tangga berikut keramik depan R. Spv GI m 4,50 0,0000,072 - 0,072 - 0,072 - 0,072 - - - 0,072 - 0,072

4 Pengaspalan Jalan (tebal 5 cm) di sekitar wilayah GI. m 840,00 0,0001,161 - 1,161 - 1,161 - 1,161 - - - 1,161 - 1,161

5 Penggantian/Perbaikan kebocoran atap Gedung yang Lama m 336,00 0,0000,247 - 0,247 - 0,247 - 0,247 - - - 0,247 - 0,247

Transportasi & Asuransi Material Diluar Trafo 1 2,6962,696 - - - - - - - - -

SUB TOTAL77,01715,7297,254100,00080,92880,928

2.3.3 Progress PekerjaanSejak bulan April 2014 sampai dengan bulan Maret 2015 tidak ada kegiatan, total Progress Pekerjaan sampai bulan Maret 2015 adalah sebesar 80,928%2.3.4 Kendala dan Tindak Lanjut

Kendala: Material CT, DS, NCT, LA belum onsite Kontrak sudah berakhir 20 Agustus 2013 namun copy amademen belum diserahkan ke pihak JMKTindak Lanjut :

Diharapkan kepada Direksi pekerjaan supaya mendesak kontraktor untuk segera mengirimkan material CT, DS, NCT, LA mengingat kontrak sudah berakhir 20 Agustus 2013 Diharapkan kepada Direksi pekerjaan supaya memberikan copy amandemen ke pihak JMK2.3.5Realisasi Manmonth dan Biaya Tunai h Realisasi Manmonth Rencana Manmonth SLA 016.SPG/611/P3BS/2013 adalah sebesar 27,36 M/MRealisasi Manmonth Bulan Februari 2015 adalah sebesar 0,11 M/M Total penggunaan Manmonth SLA 016.SPG/611/P3BS/2013 sampai bulan Februari 2015 adalah sebesar 55,60 M/M Realisasi Biaya Tunai Rencana Biaya Tunai SLA 016.SPG/611/P3BS/2013 adalah Sebesar Rp.897.834.000,-Penambahan Realisasi Biaya Tunai Bulan Februari 2015 akibat pengalihan dalah sebesar Rp.28.808.070,-Total penggunaan Biaya Tunai sampai bulan Februari 2015 adalah sebesar Rp.295.914.655,-

13