RAB Kalimantan
-
Upload
alvin-widianata -
Category
Documents
-
view
225 -
download
2
Transcript of RAB Kalimantan
document.xlsx
ib / B Q 1 / 5
PERINCIAN BIAYAPROYEK : Rumah Tinggal Type RP4LOKASI : Samarinda, Kalimantan Timur
No. Uraian Unit Volume Harga Sat. Jumlah
A Pek. Persiapan1 Pengukuran & bowplank Ls 1.00 3,550,000 3,550,000 2 Pek. Pembersihan lahan dan alat Ls 1.00 5,750,000 5,750,000
Sub Total A 9,300,000 B Pekerjaan galian1 Pek. Galian tanah dan urugan Ls 1.00 3,643,200 3,643,200 2 Pek. Galian tanah pondasi menerus Ls 1.00 3,408,600 3,408,600 3 Pek. Urugan tanah bekas galian Ls 1.00 3,063,200 3,063,200
Sub Total B 10,115,000 C Pek. Pondasi1 Pek. Pondasi Batu kali menerus M3 43.22 963,250 41,636,481 2 Pekerjaan Beton M3 108.80 722,000 78,553,600 3 Pek. Sloof praktis M3 3.71 4,288,717 15,889,697 4 Pek. Kolom praktis M3 5.58 4,288,717 23,931,041 5 Pek. Balok lantai M3 2.34 4,288,717 10,035,598 6 Pek, Plat atas kusen M3 1.47 3,488,717 5,128,414 7 Pek. Ring balk M3 2.78 4,288,717 11,917,273 8 Pek. Balok sofi-sofi M3 0.75 4,288,717 3,216,538
Sub Total C 190,308,642 D Pek. Dinding & Plesteran 1 Pek. Dinding Batako M2 337.50 292,738.00 98,799,075 2 Pek. Sofi-sofi M2 22.00 112,000 2,464,000 3 Pek. Plesteran dinding M2 675.00 32,250 21,768,750 4 Pek. Acian Dinding M2 675.00 17,200 11,610,000
Sub Total D 134,641,825 E Pek. Kusen, Pintu dan Jendela1 Pek. Kusen PJ depan M' 24.64 187,705 4,625,051 2 Pek. Kusen Jendela Depan M' 32.80 137,705 4,516,724 3 Pek. Kusen Pintu kamar M' 45.10 187,705 8,465,495 4 Pek. Kusen Jendela kamar M' 22.96 137,705 3,161,707 5 Pek. Kusen Pintu dapur M' 24.20 187,705 4,542,461 6 Pek. Kusen Jendela Dapur M' 32.80 137,705 4,516,724 7 Pek. Kusen Pintu KM M' 23.10 187,705 4,335,986 8 Pek. Kusen Jendela KM M' 14.40 187,705 2,702,952 9 Pek. Kusen Jendela R. Makan M' 13.50 137,705 1,859,018
10 Pek. Daun PJ depan Bh 4.00 579,660 2,318,640 11 Pek. Daun Jendela Depan Bh 4.00 365,300 1,461,200 12 Pek. Daun Pintu kamar Bh 8.00 365,300 2,922,400 13 Pek. Daun Jendela kamar Bh 8.00 365,300 2,922,400 14 Pek. Daun Pintu dapur Bh 4.00 435,700 1,742,800 15 Pek. Daun Jendela Dapur Bh 4.00 435,700 1,742,800 16 Pek. Daun Pintu KM Bh 4.00 435,700 1,742,800 17 Pek. Daun Jendela KM Bh 4.00 435,700 1,742,800 18 Pek. Daun Jendela R. Makan Bh 4.00 435,700 1,742,800
Sub Total E 57,064,758 F Pek. Rangka Atap1 Pek. Rangka atap M2 212.75 305,250 64,941,938 2 Pek. Lisplank M' 59.50 34,230 2,036,685
Sub Total F 66,978,623 G Pek. Penutup atap1 Pek. Atap seng gelombang M2 201.63 157,560 31,768,823
Sub Total G 31,768,823 H Pek. Plafond1 Pek. Rangka plafond Luar M2 132.00 115,200 15,206,400 2 Pek. Rangka plafond dalam M2 176.00 115,200 20,275,200 3 Pek. Penutup plafond Luar M2 132.00 46,570 6,147,240 4 Pek. Penutup plafond dalam M2 176.00 46,570 8,196,320 5 Pek. List plafond dalam M' 123.50 14,275 1,762,963
Sub Total H 51,588,123
document.xlsx
ib / B Q 2 / 5
No. Uraian Unit Volume Harga Sat. Jumlah
I Pek. Keramik1 Pas. Keramik lantai dalam M2 51.15 140,843 7,204,119 2 Pas. Keramik lantai KM/WC M2 12.60 128,560 1,619,856 3 Pas. Keramik dinding KM/WC M2 19.20 108,017 2,073,926 4 Pas. Plint Keramik lantai M 123.50 56,860 7,022,210
Sub Total I 17,920,112 J Pek. Pengunci1 Pek Kunci tanam biasa Bh 12.00 178,580 2,142,960 2 Pek Kunci tanam KM/WC Bh 4.00 124,250 497,000 3 Pek. Engsel Pintu Psg 48.00 66,200 3,177,600 4 Pek. Engsel Jendela Psg 32.00 39,800 1,273,600
Sub Total J 7,091,160 K Pek. Sanitair1 Pas. Closed jongkok Bh 4.00 612,740 2,450,960 2 Pas. Bak Fiber Bh 4.00 455,300 1,821,200 3 Pek. Floor drain Ttk 4.00 82,500 330,000 4 Pas. Kran air Ttk 8.00 67,500 540,000
Sub Total K 5,142,160 L Pek. Pemipaan Ls 1.00 3,450,000 3,450,000
Sub Total L 3,450,000 M Pek. Listrik1 Pek. Titik Lampu Ttk 36.00 173,200 6,235,200 2 Pek. Stop kontak Ttk 24.00 73,080 1,753,920
Sub Total M 7,989,120 N Pek. Pengecatan1 Pek. Cat Dinding M2 675.00 30,493 20,582,775 2 Pek. Cat Plafond M2 337.50 22,215 7,497,563 3 Pek. Cat Lisplank M' 59.50 12,215 726,793
Sub Total N 28,807,130 O Pek. Sarana1 Pek. Septic tank M2 8.00 632,700 5,061,600 2 Pek. Sumur Resapan M' 12.00 475,000 5,700,000
Sub Total O 10,761,600
JUMLAH SUB TOTAL 632,927,074 PEMBULATAN 632,927,000
Terbilang : JUMLAH + PPn 10% 696,219,700 Catatan :* Harga di atas belum termasuk ppn10%* Listrik disediakan oleh pemberi tugas* Sistem pembayaran DP 20% * Pembayaran berikutnya Progres 20%, 40%, 60%, 80% & 100%(setelah serah terima pertama/BAST1) retensi 5%* Pembayaran retensi 5% setelah 1bln BAST1`* Keamanan & kuli bongkar setempat dari pemberi tugas * Kontrak bersipat lumpsum* Dilluar pengadaan Listrik
Jakarta,
Kepada Yth,
Up. Bpk.
Dengan hormat,
TOTAL Rp 632,927,000 (Tidak termasuk Ppn 10%)
Demikian penawaran harga kami, atas perhatiannya diucapkan terima kasih.
Hormat kami,
Bersama ini kami sampaikan penawaran harga untuk pembangunan rumah tinggal typr RP4 dengan harga sebagai berikut :
NO DATA PROYEK
1 NO FILE #REF! PROPOSAL PEMBAYARAN2 PROYEK #REF!3 LOKASI #REF! DP #REF!4 OWNER BAL #REF!5 PEMBERI TUGAS #REF! PAYMNT #REF!6 KOMPETITOR
SCOPE OF WORK :- PENGADAAN MATERIAL
7 KATEGORI RANGKA ATAP - FABRIKASI- PAINTING : #REF!
#REF!#REF!#REF!
8 TIPE KONTRAK REMEASURED , FOT WORKSHOP - TRANSPORT9 JENIS TENDER TERTUTUP - ERECTION
10 ESTIMATOR #REF!
11 SCHEDULE TBA 12 TONAGE BAJA ( KG ) Err:50913 RATIO BAJA ( Rp. / Kg. ) #REF!14 FIX COST ( Rp ) #REF!15 FIX COST ( Rp / Kg ) #REF!
KOMERSIAL RO R1 R2
I BASE COST #REF!
1 COM ### #REF!2 KONTRIBUSI ### #REF!
JUMLAH #REF!
3 PPH ### #REF!
II SPH #REF!
I CADANGAN1. BAJA ### #REF!2. PEK SIPIL3
TOTAL CADANGAN #REF!
II KURS USD 10,500
III RATE BUNGA
IV TANGGAL #REF!
V VALIDITY #REF!
ESTIMATE MANAGER PROJECT DIRECTOR DIRECTOR MNG DIRECTOR PRESIDENT DIRECTOR