HASIL SURVEY HARGA UPAH, BAHAN DAN ALAT LKM " SUMBER MAKMUR " Desa : Sumber Agung Kecamatan : Klego Kabupaten : Boyolali Provinsi : Jawa Tengah Program : Pamsimas HIK 2013 No. Nama Bahan, Alat dan Upah Satuan A B C RAB A. UPAH 1 Pekerja hok Rp 30,000 Rp 30,000 Rp 30,000 Rp 40,000 2 Tukang hok Rp 35,000 Rp 35,000 Rp 35,000 Rp 50,000 3 Kepala Tukang hok Rp - Rp - Rp - Rp - 4 Kepala Kelompok hok Rp 35,000 Rp 35,000 Rp 35,000 Rp 45,000 B. BAHAN BANGUNAN 1 Bak air fiber/ water turn 1000 liter bh Rp 1,200,000 Rp 1,200,000 2 Bak air fiber/ water turn 3000 liter bh Rp 3,200,000 Rp 3,200,000 3 Bak air fiber/ water turn 5000 liter bh Rp 6,000,000 Rp 6,000,000 4 Bambu btg Rp 8,000 Rp 8,000 Rp 8,000 5 Bata merah lokal bj Rp 500 Rp 700 6 Batu blonos m3 Rp 85,000 Rp 125,000 7 Batu pecah 2/3 split manual m3 Rp 175,000 8 Bendrat/kawat beton kg Rp 16,000 9 Besi beton kg Rp 11,000 10 Boven + kaca bening 5 mm bh Rp 150,000 11 Bubungan/nok genteng press kebumen bh Rp 3,000 12 Cat meni kg Rp 15,000 13 Cat minyak kayu/besi kg Rp 40,000 14 Cat tembok kg Rp 25,000 15 Eternit polos lbr Rp 7,500 16 Floor drain bh Rp 25,000 17 Genteng press kebumen bh Rp 1,500 18 Kabel NYM 3 x 2,5 mm m' Rp 20,000 19 Kabel NYM 2 x 2,5 mm m' Rp 15,000 20 Kayu kruing m3 Rp 4,800,000 Rp 5,400,000 21 Kayu tahun m3 Rp 2,500,000 22 Kayu balok 6/12 x 3 (kayu keras) btg Rp 100,000 23 Kayu papan cor (kayu tahun) btg Rp 15,000 24 Kayu papan risplang 3/20 btg Rp 25,000 25 Kayu reng 2/3 x 4 (kayu lokal) btg Rp 5,000 26 Kayu usuk 5/7 x 3 (kayu tahun) btg Rp 15,000 27 Kayu profil btg Rp 20,000 28 Keramik lantai 20 x 20 dus Rp 38,000 29 Keramik dinding 20 x 25 dus Rp 38,000 30 Kloset Jongkok bh Rp 100,000 31 Lem PVC tube bh Rp 5,000 Rp 6,000 Rp 6,000 32 Meteran air (1set) set Rp 100,000 33 Paku eternit kg Rp 17,000 34 Paku biasa 2" - 5" kg Rp 15,000 35 Paku payung kg Rp 20,000 36 Pasir pasang m3 Rp 85,000 Rp 85,000 Rp 115,000 37 Pasir urug m3 Rp 65,000 Rp 65,000 Rp 75,000 38 Pelampung/otomatis saklar bh Rp 70,000 39 Pintu PVC bh Rp 200,000 40 Plamir tembok kg Rp 25,000 Rp 30,000 Rp 25,000 41 Pompa air 250 watt bh Rp 1,300,000 42 Pompa air 370 watt bh Rp 2,000,000 43 Pompa air 500 watt bh Rp 2,500,000 44 Pompa air 600 watt bh Rp 4,500,000 45 Portland cement (PC) kg Rp 1,250 46 Seng gelombang BJLS 30 lbr Rp 45,000 47 Seng plat/talang BJLS 30 m Rp 35,000 48 Seal teap bh Rp 5,000 Rp 5,000 49 Sirtu m3 Rp 65,000 50 Tali ijuk kg Rp 7,500 Harga Satuan (Rp)

Transcript of RAB HIK DESA SUMBER AGUNG 2013.xls

HASIL SURVEY HARGA UPAH, BAHAN DAN ALAT

LKM " SUMBER MAKMUR "

Desa : Sumber Agung

Kecamatan : Klego

Kabupaten : Boyolali

Provinsi : Jawa Tengah

Program : Pamsimas HIK 2013

No. Nama Bahan, Alat dan Upah Satuan Spesifikasi

A B C RAB

A. UPAH1 Pekerja hok Rp 30,000 Rp 30,000 Rp 30,000 Rp 40,000 2 Tukang hok Rp 35,000 Rp 35,000 Rp 35,000 Rp 50,000 3 Kepala Tukang hok Rp - Rp - Rp - Rp - 4 Kepala Kelompok hok Rp 35,000 Rp 35,000 Rp 35,000 Rp 45,000

B. BAHAN BANGUNAN1 Bak air fiber/ water turn 1000 liter bh Rp 1,200,000 Rp 1,200,000 2 Bak air fiber/ water turn 3000 liter bh Rp 3,200,000 Rp 3,200,000 3 Bak air fiber/ water turn 5000 liter bh Rp 6,000,000 Rp 6,000,000 4 Bambu btg Rp 8,000 Rp 8,000 Rp 8,000 5 Bata merah lokal bj Rp 500 Rp 700 6 Batu blonos m3 Rp 85,000 Rp 125,000 7 Batu pecah 2/3 split manual m3 Rp 175,000 8 Bendrat/kawat beton kg Rp 16,000 9 Besi beton kg Rp 11,000

10 Boven + kaca bening 5 mm bh Rp 150,000 11 Bubungan/nok genteng press kebumen bh Rp 3,000 12 Cat meni kg Rp 15,000 13 Cat minyak kayu/besi kg Rp 40,000 14 Cat tembok kg Rp 25,000 15 Eternit polos lbr Rp 7,500 16 Floor drain bh Rp 25,000 17 Genteng press kebumen bh Rp 1,500 18 Kabel NYM 3 x 2,5 mm m' Rp 20,000 19 Kabel NYM 2 x 2,5 mm m' Rp 15,000 20 Kayu kruing m3 Rp 4,800,000 Rp 5,400,000 21 Kayu tahun m3 Rp 2,500,000 22 Kayu balok 6/12 x 3 (kayu keras) btg Rp 100,000 23 Kayu papan cor (kayu tahun) btg Rp 15,000 24 Kayu papan risplang 3/20 btg Rp 25,000 25 Kayu reng 2/3 x 4 (kayu lokal) btg Rp 5,000 26 Kayu usuk 5/7 x 3 (kayu tahun) btg Rp 15,000 27 Kayu profil btg Rp 20,000 28 Keramik lantai 20 x 20 dus Rp 38,000 29 Keramik dinding 20 x 25 dus Rp 38,000

30 Kloset Jongkok bh Rp 100,000 31 Lem PVC tube bh Rp 5,000 Rp 6,000 Rp 6,000 32 Meteran air (1set) set Rp 100,000 33 Paku eternit kg Rp 17,000

34 Paku biasa 2" - 5" kg Rp 15,000

35 Paku payung kg Rp 20,000 36 Pasir pasang m3 Rp 85,000 Rp 85,000 Rp 115,000 37 Pasir urug m3 Rp 65,000 Rp 65,000 Rp 75,000 38 Pelampung/otomatis saklar bh Rp 70,000 39 Pintu PVC bh Rp 200,000 40 Plamir tembok kg Rp 25,000 Rp 30,000 Rp 25,000 41 Pompa air 250 watt bh Rp 1,300,000 42 Pompa air 370 watt bh Rp 2,000,000 43 Pompa air 500 watt bh Rp 2,500,000 44 Pompa air 600 watt bh Rp 4,500,000 (setara Grundfos/ Sanyo) 45 Portland cement (PC) kg Rp 1,250 46 Seng gelombang BJLS 30 lbr Rp 45,000 47 Seng plat/talang BJLS 30 m Rp 35,000 48 Seal teap bh Rp 5,000 Rp 5,000 49 Sirtu m3 Rp 65,000 50 Tali ijuk kg Rp 7,500

Harga Satuan (Rp)

C. BAHAN PERPIPAAN1 Pipa GI Ø 1" - 6 m bt Rp 225,000 Medium A (Galvanis) 2 Pipa GI Ø 1 1/2" - 6 m bt Rp 400,000 Medium A (Galvanis) 3 Pipa GI Ø 2" - 6 m bt Rp 450,000 Medium A (Galvanis) 4 Pipa GI Ø 3" - 6 m bt Rp 750,000 Medium A (Galvanis) 5 Pipa PVC Ø 1/2" - 4m bt Rp 13,500 AW 6 Pipa PVC Ø 1" - 4m bt Rp 25,000 AW 7 Pipa PVC Ø 1 1/4" - 4m bt Rp 40,000 AW 8 Pipa PVC Ø 1 1/2" - 4m bt Rp 48,000 AW 9 Pipa PVC Ø 2" - 4m bt Rp 60,000 AW

10 Pipa PVC Ø 3" - 4m bt Rp 125,000 AW 11 Pipa PVC Ø 4" - 4m bt Rp 210,000 AW 12 Pipa PVC Ø 1" - 4m/6m m' Rp 5,823 SNI S-10 SC 13 Pipa PVC Ø 1 1/2" - 6m m' Rp 13,133 SNI S-10 SC 14 Pipa PVC Ø 2" - 6m m' Rp 16,745 SNI S-12,5 RR 15 Pipa PVC Ø 3" - 6m m' Rp 35,020 SNI S-12,5 RR 16 Pipa PVC Ø 4" - 6m m' SNI S-12,5 RR 17 Pipa PVC Ø 6" - 6m m' SNI S-12,5 RR 18 Knee PVC Ø 1/2" bh Rp 2,000 AW 19 Knee PVC Ø 1" bh Rp 2,500 AW 20 Knee PVC Ø 1 1/4" bh Rp 3,000 AW 21 Knee PVC Ø 1 1/2" bh Rp 3,500 AW 22 Knee PVC Ø 2" bh Rp 6,500 AW 23 SDD PVC Ø 1/2" bh Rp 2,000 AW 24 SDD PVC Ø 1" bh Rp 3,000 AW 25 SDD PVC Ø 1 1/4" bh Rp 3,500 AW 26 SDD PVC Ø 1 1/2" bh Rp 4,000 AW 27 SDD PVC Ø 2" bh Rp 8,000 AW 28 SDL PVC Ø 1/2" bh Rp 2,000 AW 29 SDL PVC Ø 1" bh Rp 3,000 AW 30 SDL PVC Ø 1 1/4" bh Rp 3,500 AW 31 SDL PVC Ø 1 1/2" bh Rp 4,000 AW 32 SDL PVC Ø 2" bh Rp 8,000 AW 33 Tee PVC Ø 1/2" bh Rp 3,000 AW 34 Tee PVC Ø 1" bh Rp 5,000 AW 35 Tee PVC Ø 1 1/4" bh Rp 6,000 AW 36 Tee PVC Ø 1 1/2" bh Rp 8,000 AW 37 Tee PVC Ø 2" bh Rp 10,000 AW 38 Bend PVC Double Socket (SC) Ø 1" bh Rp 4,200 SNI 39 Bend PVC Double Socket (SC) 1 1/4" bh Rp 6,800 SNI 40 Bend PVC Double Socket (SC) 1 1/2" bh Rp 11,300 SNI 41 Long Bend PVC Double Socket (SC) 2" bh Rp 40,700 SNI 42 Long Bend PVC Double Socket (SC) 3" bh Rp 85,000 SNI 43 Long Bend PVC Double Socket (SC) 4" bh Rp 173,500 SNI 44 Long Bend PVC Double Socket (SC) 6" bh Rp 424,000 SNI 45 Tee PVC (SC) Ø 1" bh Rp 5,900 SNI 46 Tee PVC (SC) 1 1/4" bh Rp 8,700 SNI 47 Tee PVC (SC) 1 1/2" bh Rp 14,900 SNI 48 Tee PVC (SC) 2" bh Rp 50,300 SNI 49 Tee PVC (SC) 3" bh Rp 138,900 SNI 50 Tee PVC (SC) 4" bh Rp 220,800 SNI 51 Tee PVC (SC) 6" bh Rp 653,200 SNI 52 Double Socket PVC (SC) Ø 1" bh Rp 5,300 SNI 53 Double Socket PVC (SC) 1 1/4" bh Rp 6,400 SNI 54 Double Socket PVC (SC) 1 1/2" bh Rp 9,100 SNI 55 Double Socket PVC (SC) 2" bh Rp 12,900 SNI 56 Double Socket PVC (SC) 3" bh Rp 28,300 SNI 57 Double Socket PVC (SC) 4" bh Rp 37,100 SNI 58 Double Socket PVC (SC) 6" bh Rp 85,000 SNI 59 SDL/Faucet Socket PVC Ø 1" bh Rp 26,100 SNI 60 SDL/Faucet Socket PVC Ø 1 1/4" bh Rp 29,500 SNI 61 SDL/Faucet Socket PVC Ø 1 1/2" bh Rp 39,500 SNI 62 SDL/Faucet Socket PVC Ø 2" bh Rp 56,300 SNI 63 SDL/Faucet Socket PVC Ø 3" bh Rp 170,300 SNI

64 SDL/Faucet Socket PVC Ø 4" bh Rp 251,900 SNI 65 SDD/Valve Socket PVC Ø 1" bh Rp 7,200 SNI 66 SDD/Valve Socket PVC Ø 1 1/4" bh Rp 11,100 SNI 67 SDD/Valve Socket PVC Ø 1 1/2" bh Rp 19,400 SNI 68 SDD/Valve Socket PVC Ø 2" bh Rp 31,600 SNI 69 SDD/Valve Socket PVC Ø 3" bh Rp 103,000 SNI 70 SDD/Valve Socket PVC Ø 4" bh Rp 198,800 SNI 71 Reduser Ø 2"x1" bh Rp 10,300 SNI 72 Reduser Ø 2"x1 1/2" bh Rp 21,500 SNI 73 Reduser Ø 3"x2" bh Rp 55,000 SNI 74 Reduser Ø 3"x1 1/2" bh Rp 55,000 SNI 75 Reduser Ø 4"x3" bh Rp 62,900 SNI 76 Reduser Ø 4"x2" bh Rp 74,100 SNI 77 Reduser Ø 6"x4" bh Rp 135,500 SNI 78 Tee Reduser Ø 2"x1" bh Rp 50,300 SNI 79 Tee Reduser Ø 2"x1 1/2" bh Rp 50,300 SNI 80 Tee Reduser Ø 3"x2" bh Rp 240,000 SNI 81 Tee Reduser Ø 3"x1 1/2" bh Rp 248,000 SNI 82 Tee Reduser Ø 4"x3" bh Rp 302,100 SNI 83 Tee Reduser Ø 4"x2" bh Rp 302,100 SNI 84 Tee Reduser Ø 6"x4" bh Rp 914,800 SNI 85 Tee Reduser Ø 6"x3" bh Rp 914,800 SNI 86 Tee Reduser Ø 6"x2" bh Rp 996,000 SNI 87 Dop/Cap Ø 1" bh Rp 4,500 SNI 88 Dop/Cap Ø 1 1/4" bh Rp 6,600 SNI 89 Dop/Cap Ø 1 1/2" bh Rp 10,100 SNI 90 Dop/Cap Ø 2" bh Rp 22,300 SNI 91 Dop/Cap Ø 3" bh Rp 35,500 SNI 92 Dop/Cap Ø 4" bh Rp 43,100 SNI 93 Knee drat GI Ø 1" bh Rp 10,000 94 Knee drat GI Ø 1 1/2" bh Rp 16,000 95 Knee drat GI Ø 2" bh Rp 20,000 96 Knee drat GI Ø 3" bh Rp 70,000 97 Shock drat GI Ø 1" bh Rp 7,000 98 Shock drat GI Ø 1 1/2" bh Rp 14,000 99 Shock drat GI Ø 2" bh Rp 18,000

100 Shock drat GI Ø 3" bh Rp 50,000 101 Tee GI Ø 1" bh Rp 12,000 102 Tee GI Ø 1 1/2" bh Rp 20,000 103 Tee GI Ø 2" bh Rp 25,000 104 Tee GI Ø 3" bh Rp 100,000 105 Gate valve Ø 1/2" bh Rp 30,000 106 Gate valve Ø 1" bh Rp 80,000 107 Gate valve Ø 1 1/2" bh Rp 160,000 108 Gate valve Ø 2" bh Rp 300,000 109 Gate valve Ø 3" bh Rp 650,000 110 Kran air Ø 1/2" bh Rp 15,000 111 Klem saddle 1 1/2" x 1/2" bh Rp 20,000 112 Klem saddle 2" x 1/2" bh Rp 20,000

D. ALAT1 Benang bh Rp 1,000 Rp 2,000 Rp 1,000 Rp 1,000 2 Cangkul bh Rp 40,000 Rp 50,000 Rp 50,000 3 Cetok bh Rp 15,000 4 Dandang bh Rp 40,000 Rp 45,000 Rp 45,000 5 Ember bh Rp 5,000 Rp 7,500 Rp 6,000 Rp 6,000 6 Kuas besar bh Rp 10,000 Rp 10,000 7 Kuas kecil bh Rp 2,500 Rp 2,500 8 Kuas roll bh Rp 15,000 Rp 13,000 Rp 13,000 9 Linggis bh Rp 50,000 Rp 50,000 Rp 50,000

10 Sekrap bh Rp 5,000 Rp 5,000 11 Sekop bh Rp 50,000 Rp 60,000 Rp 50,000

HARGA SATUAN BAHAN, ALAT DAN UPAH

Desa : Sumber AgungKecamatan : KlegoKabupaten : BoyolaliProvinsi : Jawa TengahProgram : Pamsimas HIK 2013

No. Nama Barang/ Alat/ Jasa Satuan Spesifikasi

1 2 3 4 5

A. UPAH1 Pekerja ho 40,000 2 Tukang ho 45,000 3 Kepala Tukang ho - 4 Kepala Kelompok ho 45,000

B. BAHAN BANGUNAN1 Bak air fiber/ water turn 1000 liter bh Rp 1,200,000 2 Bak air fiber/ water turn 3000 liter bh Rp 3,200,000 3 Bak air fiber/ water turn 5000 liter bh Rp 6,000,000 4 Bambu btg Rp 8,000 5 Bata merah bj Rp 700 6 Batu blonos/kali m3 Rp 125,000 7 Batu pecah 2/3 split m3 Rp 175,000 8 Bendrat/kawat beton kg Rp 16,000 9 Besi beton kg Rp 11,000

10 Boven + kaca bening 5 mm bh Rp 150,000 11 Bubungan/nok genteng press bh Rp 3,000 12 Cat meni kg Rp 15,000 13 Cat minyak kayu/besi kg Rp 40,000 14 Cat tembok kg Rp 25,000 15 Eternit polos lbr Rp 7,500 16 Floor drain bh Rp 25,000 17 Genteng press bh Rp 1,500 18 Kabel NYY 3 x 2,5 mm m' Rp 20,000 19 Kabel NYM 2 x 2,5 mm m' Rp 15,000 20 Kayu kruing m3 Rp 5,400,000 21 Kayu tahun m3 Rp 2,500,000 22 Kayu balok 6/12 x 3 (kayu keras) btg Rp 100,000 23 Kayu papan cor (kayu tahun) btg Rp 15,000 24 Kayu papan risplang 3/20 btg Rp 25,000 25 Kayu reng 2/3 x 4 (kayu keras) btg Rp 5,000 26 Kayu usuk 5/7 x 3 (kayu tahun) btg Rp 15,000 27 Kayu profil btg Rp 20,000 28 Keramik lantai 20 x 20 dus Rp 38,000 29 Keramik dinding 20 x 25 dus Rp 38,000 30 Kloset Jongkok bh Rp 100,000 31 Lem PVC tube bh Rp 6,000 32 Meteran air (1set) set Rp 100,000 33 Paku eternit kg Rp 13,000 34 Paku biasa 2" - 5" kg Rp 10,000 35 Paku payung kg Rp 15,000 36 Pasir pasang m3 Rp 115,000

Harga Satuan (Rp)

37 Pasir urug m3 Rp 75,000 38 Pelampung/otomatis saklar bh Rp 70,000 39 Pintu PVC bh Rp 200,000 40 Plamir tembok kg Rp 25,000 41 Pompa air 250 watt bh Rp 1,300,000 42 Pompa air 370 watt bh Rp 2,000,000 43 Pompa air 500 watt bh Rp 2,500,000 44 Pompa air 750 watt bh Rp 4,500,000 (setara Grundfos/ Sanyo) 45 Portland cement (PC) kg Rp 1,200 46 Seng gelombang BJLS lbr Rp 45,000 47 Seng plat/talang lbr Rp 35,000 48 Seal teap bh Rp 5,000 49 Sirtu m3 Rp 65,000 50 Tali ijuk kg Rp 7,500

C. BAHAN PERPIPAAN1 Pipa GI Ø 1" - 6 m bt Rp 225,000 Medium A (Galvanis) 2 Pipa GI Ø 1 1/2" - 6 m bt Rp 400,000 Medium A (Galvanis) 3 Pipa GI Ø 2" - 6 m bt Rp 450,000 Medium A (Galvanis) 4 Pipa GI Ø 3" - 6 m bt Rp 750,000 Medium A (Galvanis) 5 Pipa PVC Ø 1/2" - 4m bt Rp 13,500 AW 6 Pipa PVC Ø 1" - 4m bt Rp 25,000 AW 7 Pipa PVC Ø 1 1/4" - 4m bt Rp 40,000 AW 8 Pipa PVC Ø 1 1/2" - 4m bt Rp 48,000 AW 9 Pipa PVC Ø 2" - 4m bt Rp 60,000 AW

10 Pipa PVC Ø 3" - 4m bt Rp 125,000 AW 11 Pipa PVC Ø 4" - 4m bt Rp 210,000 AW 12 Pipa PVC Ø 1" - 4m/6m m' Rp 5,850 SNI S-10 SC 13 Pipa PVC Ø 1 1/2" - 6m m' Rp 13,200 SNI S-12,5 SC 14 Pipa PVC Ø 2" - 6m m' Rp 16,800 SNI S-12,5 RR 15 Pipa PVC Ø 3" - 6m m' Rp 35,020 SNI S-12,5 RR 16 Pipa PVC Ø 4" - 6m m' Rp - SNI S-12,5 RR 17 Pipa PVC Ø 6" - 6m m' Rp - SNI S-12,5 RR 18 Knee PVC Ø 1/2" bh Rp 2,000 AW 19 Knee PVC Ø 1" bh Rp 2,500 AW 20 Knee PVC Ø 1 1/4" bh Rp 3,000 AW 21 Knee PVC Ø 1 1/2" bh Rp 3,500 AW 22 Knee PVC Ø 2" bh Rp 6,500 AW 23 SDD PVC Ø 1/2" bh Rp 2,000 AW 24 SDD PVC Ø 1" bh Rp 3,000 AW 25 SDD PVC Ø 1 1/4" bh Rp 3,500 AW 26 SDD PVC Ø 1 1/2" bh Rp 4,000 AW 27 SDD PVC Ø 2" bh Rp 8,000 AW 28 SDL PVC Ø 1/2" bh Rp 2,000 AW 29 SDL PVC Ø 1" bh Rp 3,000 AW 30 SDL PVC Ø 1 1/4" bh Rp 3,500 AW 31 SDL PVC Ø 1 1/2" bh Rp 4,000 AW 32 SDL PVC Ø 2" bh Rp 8,000 AW 33 Tee PVC Ø 1/2" bh Rp 3,000 AW 34 Tee PVC Ø 1" bh Rp 5,000 AW 35 Tee PVC Ø 1 1/4" bh Rp 6,000 AW 36 Tee PVC Ø 1 1/2" bh Rp 8,000 AW 37 Tee PVC Ø 2" bh Rp 10,000 AW 38 Bend PVC Double Socket (SC) Ø 1" bh Rp 4,200 SNI 39 Bend PVC Double Socket (SC) 1 1/4" bh Rp 6,800 SNI 40 Bend PVC Double Socket (SC) 1 1/2" bh Rp 11,300 SNI

41 Long Bend PVC Double Socket (SC) 2" bh Rp 40,700 SNI 42 Long Bend PVC Double Socket (SC) 3" bh Rp 85,000 SNI 43 Long Bend PVC Double Socket (SC) 4" bh Rp 173,500 SNI 44 Long Bend PVC Double Socket (SC) 6" bh Rp 424,000 SNI 45 Tee PVC (SC) Ø 1" bh Rp 5,900 SNI 46 Tee PVC (SC) 1 1/4" bh Rp 8,700 SNI 47 Tee PVC (SC) 1 1/2" bh Rp 14,900 SNI 48 Tee PVC (SC) 2" bh Rp 50,300 SNI 49 Tee PVC (SC) 3" bh Rp 138,900 SNI 50 Tee PVC (SC) 4" bh Rp 220,800 SNI 51 Tee PVC (SC) 6" bh Rp 653,200 SNI 52 Double Socket PVC (SC) Ø 1" bh Rp 5,300 SNI 53 Double Socket PVC (SC) 1 1/4" bh Rp 6,400 SNI 54 Double Socket PVC (SC) 1 1/2" bh Rp 9,100 SNI 55 Double Socket PVC (SC) 2" bh Rp 12,900 SNI 56 Double Socket PVC (SC) 3" bh Rp 28,300 SNI 57 Double Socket PVC (SC) 4" bh Rp 37,100 SNI 58 Double Socket PVC (SC) 6" bh Rp 85,000 SNI 59 SDD/Faucet Socket PVC Ø 1" bh Rp 26,100 SNI 60 SDD/Faucet Socket PVC Ø 1 1/4" bh Rp 29,500 SNI 61 SDD/Faucet Socket PVC Ø 1 1/2" bh Rp 39,500 SNI 62 SDD/Faucet Socket PVC Ø 2" bh Rp 56,300 SNI 63 SDD/Faucet Socket PVC Ø 3" bh Rp 170,300 SNI 64 SDD/Faucet Socket PVC Ø 4" bh Rp 251,900 SNI 65 SDL/Valve Socket PVC Ø 1" bh Rp 7,200 SNI 66 SDL/Valve Socket PVC Ø 1 1/4" bh Rp 11,100 SNI 67 SDL/Valve Socket PVC Ø 1 1/2" bh Rp 19,400 SNI 68 SDL/Valve Socket PVC Ø 2" bh Rp 31,600 SNI 69 SDL/Valve Socket PVC Ø 3" bh Rp 103,000 SNI 70 SDL/Valve Socket PVC Ø 4" bh Rp 198,800 SNI 71 Reduser Ø 2"x1" bh Rp 10,300 SNI 72 Reduser Ø 2"x1 1/2" bh Rp 21,500 SNI 73 Reduser Ø 3"x2" bh Rp 55,000 SNI 74 Reduser Ø 3"x1 1/2" bh Rp 55,000 SNI 75 Reduser Ø 4"x3" bh Rp 62,900 SNI 76 Reduser Ø 4"x2" bh Rp 74,100 SNI 77 Reduser Ø 6"x4" bh Rp 135,500 SNI 78 Tee Reduser Ø 2"x1" bh Rp 50,300 SNI 79 Tee Reduser Ø 2"x1 1/2" bh Rp 50,300 SNI 80 Tee Reduser Ø 3"x2" bh Rp 240,000 SNI 81 Tee Reduser Ø 3"x1 1/2" bh Rp 248,000 SNI 82 Tee Reduser Ø 4"x3" bh Rp 302,100 SNI 83 Tee Reduser Ø 4"x2" bh Rp 302,100 SNI 84 Tee Reduser Ø 6"x4" bh Rp 914,800 SNI 85 Tee Reduser Ø 6"x3" bh Rp 914,800 SNI 86 Tee Reduser Ø 6"x2" bh Rp 996,000 SNI 87 Dop/Cap Ø 1" bh Rp 10,000 SNI 88 Dop/Cap Ø 1 1/4" bh Rp 16,000 SNI 89 Dop/Cap Ø 1 1/2" bh Rp 20,000 SNI 90 Dop/Cap Ø 2" bh Rp 70,000 SNI 91 Dop/Cap Ø 3" bh Rp 90,000 SNI 92 Dop/Cap Ø 4" bh Rp 14,000 SNI 93 Knee drat GI Ø 1" bh Rp 10,000 94 Knee drat GI Ø 1 1/2" bh Rp 16,000 95 Knee drat GI Ø 2" bh Rp 20,000 96 Knee drat GI Ø 3" bh Rp 70,000 97 Shock drat GI Ø 1" bh Rp 7,000

98 Shock drat GI Ø 1 1/2" bh Rp 14,000 99 Shock drat GI Ø 2" bh Rp 18,000

100 Shock drat GI Ø 3" bh Rp 50,000 101 Tee GI Ø 1" bh Rp 12,000 102 Tee GI Ø 1 1/2" bh Rp 20,000 103 Tee GI Ø 2" bh Rp 25,000 104 Tee GI Ø 3" bh Rp 100,000 105 Gate valve Ø 1/2" bh Rp 30,000 106 Gate valve Ø 1" bh Rp 80,000 107 Gate valve Ø 1 1/2" bh Rp 160,000 108 Gate valve Ø 2" bh Rp 300,000 109 Gate valve Ø 3" bh Rp 650,000 110 Kran air Ø 1/2" bh Rp 15,000 111 Klem saddle 1 1/2" x 1/2" bh Rp 20,000 112 Klem saddle 2" x 1/2" bh Rp 20,000

D. ALAT1 Benang rol Rp 1,000 2 Cangkul bh Rp 50,000 3 Cetok bh Rp 15,000 4 Dandang bh Rp 45,000 5 Ember bh Rp 6,000 6 Kuas besar bh Rp 10,000 7 Kuas kecil bh Rp 2,500 8 Kuas roll bh Rp 13,000 9 Linggis bh Rp 50,000

10 Meteran bh Rp 20,000 11 Sekrap bh Rp 5,000 12 Sekop bh Rp 50,000

Sumber Agung, tember 2013

Disetujui oleh : Dibuat oleh :Koordinator LKM SATLAK

( Sunyono ) ( Gunadi )

Ketua DPMU Fasilitator HIK

(Martono, ST. ) ( Zufron Asrofi Tunggul N, S.Sos )NIP. 19630605 199309 1 001

HASIL SURVEY HARGA ATK

LKM " SUMBER MAKMUR "

Desa : Sumber Agung

Kecamatan : Klego

Kabupaten : Boyolali

Provinsi : Jawa Tengah

Program : Pamsimas HIK 2013

No. Nama Barang Satuan

RONI JAYA CITRA MULIA CENTER RAB

1 Pensil 2B buah Rp 3,000 Rp 3,500 Rp 3,000 Rp 3,000

2 Penghapus karet buah Rp 2,000 Rp 2,000 Rp 2,000 Rp 2,000

3 Bollpoint buah Rp 1,000 Rp 1,200 Rp 1,000 Rp 2,000

4 Drawing pen buah Rp 8,000 Rp 8,800 Rp 8,000 Rp 8,000

5 Spidol besar buah Rp 6,000 Rp 6,500 Rp 5,000 Rp 7,000

6 Buku tulis tebal buah Rp 3,000 Rp 3,000 Rp 3,000 Rp 3,000

7 Spidol kecil pak Rp 10,000 Rp 11,000 Rp 10,000 Rp 12,000

8 Tip-ex fluid sedang buah Rp 3,000 Rp 3,500 Rp 5,000 Rp 3,000

9 Garisan mika buah Rp 3,000

10 Notes book buah Rp 4,500

11 Buku kas folio bergaris buah Rp 20,000

12 Kwitansi besar buah Rp 4,000 Rp 3,500 Rp 3,000 Rp 3,000

13 Stopmap biasa folio buah Rp 500 Rp 500

14 Stopmap plastik buah Rp 2,500 Rp 5,750 Rp 3,000 Rp 2,500

15 Snelhekter plastik buah Rp 6,000

16 Amplop plastik besar buah Rp 3,000

17 Kertas manila lembar Rp 1,500 Rp 1,600 Rp 1,500 Rp 1,500

18 Kertas plano lembar Rp 500

19 Kertas HVS A4 80 gram rim Rp 35,000 Rp 35,000 Rp 37,000

20 Kertas HVS A4 70 gram rim Rp 30,000 Rp 33,000 Rp 35,000

21 Tinta printer hitam botol Rp 37,000

22 Tinta printer warna botol Rp 37,000

23 Steples kecil buah Rp 6,000 Rp 5,500 Rp 9,000 Rp 8,500

24 Steples sedang buah Rp 14,000 Rp 14,000 Rp 14,000

25 Isi steples kecil dus Rp 1,500

26 Isi steples sedang dus Rp 2,500

27 Pisau cutter besar (L-500) buah Rp 10,000 Rp 10,000 Rp 10,000 Rp 10,000

28 Isi pisau cutter besar pak Rp 3,500 Rp 3,500

Harga Satuan (Rp)

29 Plakban kertas rol Rp 6,000 Rp 6,500 Rp 7,000 Rp 6,000

30 Plakban hitam besar rol Rp 8,500 Rp 12,500 Rp 9,000 Rp 8,500

31 Isolasi dobel tape rol Rp 6,000

32 Flashdisk 8 Gb buah Rp 70,000 Rp 85,000 Rp 75,000 Rp 90,000

33 Gunting buah Rp 5,500 Rp 5,500 Rp 8,000 Rp 8,000

34 Perforator kecil buah Rp 10,000 Rp 11,500 Rp 8,000 Rp 8,000

35 Kalkulator 12 digit (besar) buah Rp 97,500 Rp 80,000

36 Lemari filling plastik buah Rp 200,000 Rp 200,000 Rp 200,000

37 Materai 3000 lembar Rp 3,500 Rp 3,250 Rp 3,500 Rp 3,500

38 Materai 6000 lembar Rp 6,500 Rp 6,500 Rp 6,500 Rp 6,500

39 Cetak banner meter Rp 30,000

40 Foto copy lembar Rp 150 Rp 125 Rp 150 Rp 200

41 Jilid buah Rp 4,500

42 Cetak foto lembar Rp 2,000

43 Kamera digital + memori buah Rp 1,500,000

Kami yang melakukan Survey Harga :

( ........................................................................... )

HASIL SURVEY HARGA ATK

LKM " SUMBER MAKMUR "

Spesifikasi

Yang disurvey :

HARGA SATUAN ATK

Desa : Sumber AgungKecamatan : KlegoKabupaten : BoyolaliProvinsi : Jawa TengahProgram : Pamsimas HIK 2013

No. Nama Barang Satuan Spesifikasi

1 2 3 4 5

1 Pensil 2B buah Rp 3,000

2 Penghapus karet buah Rp 2,000

3 Bollpoint buah Rp 2,000

4 Drawing pen buah Rp 8,000

5 Spidol besar buah Rp 7,000

6 Spidol kecil pak Rp 12,000

7 Tip-ex fluid sedang buah Rp 3,000

8 Garisan mika buah Rp 3,000

9 Notes book buah Rp 4,500

10 Buku tulis tebal buah Rp 3,000

11 Buku kas folio bergaris buah Rp 20,000

12 Kwitansi besar buah Rp 3,000

13 Stopmap biasa folio buah Rp 500

14 Stopmap plastik buah Rp 2,500

15 Snelhekter plastik buah Rp 6,000

16 Amplop plastik besar buah Rp 3,000

17 Kertas manila lembar Rp 1,500

18 Kertas plano lembar Rp 500

19 Kertas HVS A4 80 gram rim Rp 37,000

20 Kertas HVS A4 70 gram rim Rp 35,000

21 Tinta printer hitam botol Rp 37,000

22 Tinta printer warna botol Rp 37,000

23 Steples kecil buah Rp 8,500

24 Steples sedang buah Rp 14,000

25 Isi steples kecil dus Rp 1,500

26 Isi steples sedang dus Rp 2,500

27 Pisau cutter besar (L-500) buah Rp 10,000

28 Isi pisau cutter besar pak Rp 3,500

29 Plakban kertas rol Rp 6,000

30 Plakban hitam rol Rp 8,500

31 Isolasi dobel tape rol Rp 6,000

32 Flashdisk 4 Gb buah Rp 90,000

33 Gunting buah Rp 8,000

34 Perforator kecil buah Rp 8,000

35 Kalkulator 12 digit (besar) buah Rp 80,000

36 Lemari filling kabinet plastik buah Rp 200,000

37 Materai 6000 lembar Rp 6,500

38 Cetak banner meter Rp 30,000

Harga Satuan (Rp)

39 Foto copy lembar Rp 200

40 Jilid buah Rp 4,500

41 Cetak foto lembar Rp 2,000

42 Kamera digital + memori buah Rp 1,500,000

Sumber Agung , September 2013

Disetujui oleh : Dibuat oleh :Koordinator LKM TIRTA MUKTI SATLAK

( Sunyono ) ( Gunadi )

Ketua DPMU Fasilitator HIK

(Martono, ST. ) ( Zufron Asrofi Tunggul N, S.Sos )NIP. 19630605 199309 1 001

ANALISA PEKERJAAN

Desa : Sumber AgungKecamatan : KlegoKabupaten : BoyolaliProvinsi : Jawa TengahProgram : Pamsimas HIK 2013

An. SNI - A.6.4 1 m' Pengukuran dan pemasangan bouwplank (kayu tahun)

Bahan

Kayu 5/7 (kayu tahun) 0.0120 x Rp 2,500,000.00 Rp 30,000.00

Paku biasa 2" - 5" 0.0200 Kg x Rp 10,000.00 Rp 200.00

Kayu papan 3/20 0.0070 x Rp 2,000,000.00 Rp 14,000.00

Rp 44,200.00

Tenaga

Pekerja 0.1000 Oh x Rp 40,000.00 Rp 4,000.00

Tukang 0.1000 Oh x Rp 45,000.00 Rp 4,500.00

Kepala tukang 0.0100 Oh x Rp - Rp -

Kpl. Kelompok 0.0050 Oh x Rp 45,000.00 Rp 225.00

Rp 8,725.00

Rp 52,925.00

An. SNI - A.6.8 Membersihkan lapangan dan perataan

Tenaga

Pekerja 0.1000 Oh x Rp 40,000.00 Rp 4,000.00

Kpl. Kelompok 0.0500 Oh x Rp 45,000.00 Rp 2,250.00

Rp 6,250.00

An. SNI - A.6.10 1 bh Pembuatan bak adukan ukuran ( 40 x 50 x 20 ) cm kayu tahun

Bahan

Kayu papan 3/20 (kayu tahun) 0.0360 x Rp 2,500,000.00 Rp 90,000.00

Paku biasa 2" - 5" 0.0800 Kg x Rp 10,000.00 Rp 800.00

Kayu 5/7 1.0000 Btg x Rp 20,000.00 Rp 20,000.00

Rp 110,800.00

Tenaga

Tukang 0.3000 Oh x Rp 45,000.00 Rp 13,500.00 Rp 13,500.00

Rp 124,300.00

An. SNI - A.6.11 Pembuatan stegger dari bambu

Bahan

Bambu Ø 6 - 8/ 6 m 1.0000 Btg x Rp 8,000.00 Rp 8,000.00

Tali ijuk 0.2500 Kg x Rp 7,500.00 Rp 1,875.00

Rp 9,875.00

Tenaga

Pekerja 0.0170 Oh x Rp 40,000.00 Rp 680.00

Tukang 0.2500 Oh x Rp 45,000.00 Rp 11,250.00

Kepala tukang 0.0020 Oh x Rp - Rp -

Kpl. Kelompok 0.0130 Oh x Rp 45,000.00 Rp 585.00

Rp 12,515.00

Rp 22,390.00

An. SNI - B.6.1 Galian tanah biasa sedalam 1 meter

Tenaga

Pekerja 0.4000 Oh x Rp 40,000.00 Rp 16,000.00

Kpl. Kelompok 0.0400 Oh x Rp 45,000.00 Rp 1,800.00

Rp 17,800.00

An. SNI - B.6.4 Galian tanah keras sedalam 1 meter

Tenaga

Pekerja 0.6250 Oh x Rp 40,000.00 Rp 25,000.00

Kpl. Kelompok 0.0620 Oh x Rp 45,000.00 Rp 2,790.00

Rp 27,790.00

An. SNI - B.6.9 Urugan kembali

Tenaga

Pekerja 0.1920 Oh x Rp 40,000.00 Rp 7,680.00

Kpl. Kelompok 0.0190 Oh x Rp 45,000.00 Rp 855.00

Rp 8,535.00

An. SNI - B.6.11 Urugan pasir

Bahan

Pasir urug 1.2000 x Rp 75,000.00 Rp 90,000.00

Rp 90,000.00

Tenaga

Pekerja 0.3000 Oh x Rp 40,000.00 Rp 12,000.00

Kpl. Kelompok 0.0100 Oh x Rp 45,000.00 Rp 450.00

Rp 12,450.00

Rp 102,450.00

An. SNI - B.6.15 Urugan sirtu

Bahan

Sirtu 1.2000 x Rp 65,000.00 Rp 78,000.00

Rp 78,000.00

Tenaga

Pekerja 0.2500 Oh x Rp 40,000.00 Rp 10,000.00

Kpl. Kelompok 0.0250 Oh x Rp 45,000.00 Rp 1,125.00

Rp 11,125.00

Rp 89,125.00

M3

M3

1 m2

M3

1 m2

1 m3

1 m3

1 m3

1 m3

M3

1 m3

M3

An. SNI - C.6.5 Pasang pondasi batu kali 1 Pc : 4 Ps

Bahan

Batu blonos/kali 1.1000 x Rp 125,000.00 Rp 137,500.00

Semen Portland 163.0000 Kg x Rp 1,200.00 Rp 195,600.00

Pasir pasang 0.5200 x Rp 115,000.00 Rp 59,800.00

Rp 392,900.00

Tenaga

Pekerja 1.5000 Oh x Rp 40,000.00 Rp 60,000.00

Tukang 0.6000 Oh x Rp 45,000.00 Rp 27,000.00

Kepala Tukang 0.0600 Oh x Rp - Rp -

Kpl. Kelompok 0.0750 Oh x Rp 45,000.00 Rp 3,375.00

Rp 90,375.00

Rp 483,275.00

An. SNI - C.6.114 Pasang pondasi batu kosong

Bahan

Batu blonos/kali 1.2000 x Rp 125,000.00 Rp 150,000.00

Pasir urug 0.3000 x Rp 75,000.00 Rp 22,500.00

Rp 172,500.00

Tenaga

Pekerja 0.7800 Oh x Rp 40,000.00 Rp 31,200.00

Tukang 0.3900 Oh x Rp 45,000.00 Rp 17,550.00

Kepala Tukang 0.0360 Oh x Rp - Rp -

Kpl. Kelompok 0.0390 Oh x Rp 45,000.00 Rp 1,755.00

Rp 50,505.00

Rp 223,005.00

An. SNI - D.6.11 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps

Bahan

Bata merah 5 x 11 x 22 cm 70.0000 Bh x Rp 700.00 Rp 49,000.00

Semen Portland 11.5000 Kg x Rp 1,200.00 Rp 13,800.00

Pasir pasang 0.0430 x Rp 115,000.00 Rp 4,945.00

Rp 67,745.00

Tenaga

Pekerja 0.3200 Oh x Rp 40,000.00 Rp 12,800.00

Tukang 0.1000 Oh x Rp 45,000.00 Rp 4,500.00

Kepala Tukang 0.0100 Oh x Rp - Rp -

Kpl. Kelompok 0.0150 Oh x Rp 45,000.00 Rp 675.00

Rp 17,975.00

Rp 85,720.00

An. SNI - E.6.4 Plesteran 1 Pc : 4 Ps , tebal 15 mm

Bahan

Semen Portland 5.2000 Kg x Rp 1,200.00 Rp 6,240.00

Pasir pasang 0.0200 x Rp 115,000.00 Rp 2,300.00

Rp 8,540.00

Tenaga

Pekerja 0.2000 Oh x Rp 40,000.00 Rp 8,000.00

Tukang 0.1500 Oh x Rp 45,000.00 Rp 6,750.00

Kepala Tukang 0.0150 Oh x Rp - Rp -

Kpl. Kelompok 0.0100 Oh x Rp 45,000.00 Rp 450.00

Rp 15,200.00

Rp 23,740.00

An. SNI - E.6.29 Plesteran Beton 1 Pc : 2 Ps , tebal 15 mm

Bahan

Semen portland 9.3000 Kg x Rp 1,200.00 Rp 11,160.00

Pasir pasang 0.0180 x Rp 115,000.00 Rp 2,070.00

Rp 13,230.00

Tenaga

Pekerja 0.2600 Oh x Rp 40,000.00 Rp 10,400.00

Tukang 0.2000 Oh x Rp 45,000.00 Rp 9,000.00

Kepala Tukang 0.0200 Oh x Rp - Rp -

Kpl. Kelompok 0.0130 Oh x Rp 45,000.00 Rp 585.00

Rp 19,985.00

Rp 33,215.00

An. SNI - F.6.2 Pasang kusen pintu dan jendela kayu kruing

Bahan

Kayu kruing, balok 1.2000 x Rp 5,400,000.00 Rp 6,480,000.00

Rp 6,480,000.00

Tenaga

Pekerja 6.0000 Oh x Rp 40,000.00 Rp 240,000.00

Tukang 18.0000 Oh x Rp 45,000.00 Rp 810,000.00

Kepala Tukang 2.0000 Oh x Rp - Rp -

Kpl. Kelompok 0.3000 Oh x Rp 45,000.00 Rp 13,500.00

Rp 1,063,500.00

Rp 7,543,500.00

An. SNI - F.6.8 Pasang pintu panel kayu kruing

Bahan

Kayu kruing, papan 0.0400 x Rp 5,400,000.00 Rp 216,000.00

Rp 216,000.00

Tenaga

Pekerja 1.0000 Oh x Rp 40,000.00 Rp 40,000.00

Tukang 2.5000 Oh x Rp 45,000.00 Rp 112,500.00

Kepala Tukang 0.2500 Oh x Rp - Rp -

Kpl. Kelompok 0.0500 Oh x Rp 45,000.00 Rp 2,250.00

Rp 154,750.00

Rp 370,750.00

1 m3

M3

M3

1 m3

M3

M3

1 m2

M3

1 m2

M3

1 m2

M3

1 m3

M3

1 m2

M3

An. SNI - F.6.10 Pasang pintu dan jendela kaca kayu kruing

Bahan

Kayu kruing, papan 0.0350 x Rp 5,400,000.00 Rp 189,000.00

Rp 189,000.00

Tenaga

Pekerja 0.8000 Oh x Rp 40,000.00 Rp 32,000.00

Tukang 2.0000 Oh x Rp 45,000.00 Rp 90,000.00

Kepala Tukang 0.2000 Oh x Rp - Rp -

Kpl. Kelompok 0.0400 Oh x Rp 45,000.00 Rp 1,800.00

Rp 123,800.00

Rp 312,800.00

An. SNI - F.6.30 Pasang konstruksi kuda-kuda, gording kayu kruing

Bahan

Kayu kruing, balok 1.1000 x Rp 5,400,000.00 Rp 5,940,000.00

Besi strip 15.0000 Kg x Rp 13,000.00 Rp 195,000.00

Paku biasa 2" - 5" 0.8000 Kg x Rp 10,000.00 Rp 8,000.00

Rp 6,143,000.00

Tenaga

Pekerja 4.0000 Oh x Rp 40,000.00 Rp 160,000.00

Tukang 12.0000 Oh x Rp 45,000.00 Rp 540,000.00

Kepala Tukang 1.2000 Oh x Rp - Rp -

Kpl. Kelompok 0.2000 Oh x Rp 45,000.00 Rp 9,000.00

Rp 709,000.00

Rp 6,852,000.00

An. SNI - F.6.31 Pas.Kaso dan Reng genteng ( Kodok, Plentong, Vlams dan sejenisnya ) Kayu Kruing

Bahan

Kayu kruing 0.0120 x Rp 5,400,000.00 Rp 64,800.00

Paku biasa 2" - 5" 0.1500 Kg x Rp 10,000.00 Rp 1,500.00

Rp 66,300.00

Tenaga

Pekerja 0.1000 Oh x Rp 40,000.00 Rp 4,000.00

Tukang 0.1000 Oh x Rp 45,000.00 Rp 4,500.00

Kepala Tukang 0.0100 Oh x Rp - Rp -

Kpl. Kelompok 0.0050 Oh x Rp 45,000.00 Rp 225.00

Rp 8,725.00

Rp 75,025.00

An. SNI - F.6.39 Pasang rangka langit-langit ( 1,00 x 1,00 ) m, kayu Albasia

Bahan

Kayu tahun, balok 0.0120 x Rp 2,500,000.00 Rp 30,000.00

Paku biasa 2" - 5" 0.1000 Kg x Rp 10,000.00 Rp 1,000.00

Rp 31,000.00

Tenaga

Pekerja 0.1500 Oh x Rp 40,000.00 Rp 6,000.00

Tukang 0.2500 Oh x Rp 45,000.00 Rp 11,250.00

Kepala Tukang 0.0250 Oh x Rp - Rp -

Kpl. Kelompok 0.0750 Oh x Rp 45,000.00 Rp 3,375.00

Rp 20,625.00

Rp 51,625.00

An. SNI - F.6.20 Pasang langit-langit eternit( 1,00 x 1,00 ) m,

Bahan

Eternit 1.1000 M2 x Rp 7,500.00 Rp 8,250.00

Paku eternit 0.0100 Kg x Rp 13,000.00 Rp 130.00

Rp 8,380.00

Tenaga

Pekerja 0.0300 Oh x Rp 40,000.00 Rp 1,200.00

Tukang 0.0700 Oh x Rp 45,000.00 Rp 3,150.00

Kepala Tukang 0.0070 Oh x Rp - Rp -

Kpl. Kelompok 0.0015 Oh x Rp 45,000.00 Rp 67.50

Rp 4,417.50

Rp 12,797.50

An. SNI - F.6.48 1 m' Pasang lisplank ukuran ( 3 x 20 ) cm, kayu Albasia

Bahan

Kayu tahun, papan 0.0720 x Rp 2,500,000.00 Rp 180,000.00

Paku biasa 2" - 5" 0.0500 Kg x Rp 10,000.00 Rp 500.00

Rp 180,500.00

Tenaga

Pekerja 0.1000 Oh x Rp 40,000.00 Rp 4,000.00

Tukang 0.2000 Oh x Rp 45,000.00 Rp 9,000.00

Kepala Tukang 0.0250 Oh x Rp - Rp -

Kpl. Kelompok 0.0050 Oh x Rp 45,000.00 Rp 225.00

Rp 13,225.00

Rp 193,725.00

An. SNI - G.6.1 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr

Bahan

Semen Portland 218.0000 Kg x Rp 1,200.00 Rp 261,600.00

Pasir pasang 0.5200 x Rp 115,000.00 Rp 59,800.00

Batu pecah 2/3 split 0.8700 x Rp 175,000.00 Rp 152,250.00

Rp 473,650.00

Tenaga

Pekerja 1.6500 Oh x Rp 40,000.00 Rp 66,000.00

Tukang 0.2500 Oh x Rp 45,000.00 Rp 11,250.00

Kepala Tukang 0.0250 Oh x Rp - Rp -

Kpl. Kelompok 0.0800 Oh x Rp 45,000.00 Rp 3,600.00

Rp 80,850.00

Rp 554,500.00

1 m2

M3

1 m3

M3

1 m2

M3

1 m2

M3

1 m2

M3

M3

M3

An. SNI - G.6.13 1 m3 Cor beton, 1 Pc : 2 Ps : 3 Kr

A. ADUKAN Bahan :

Semen Portland 336.0000 Kg x Rp 1,200.00 Rp 403,200.00

Pasir pasang 0.5400 M3 x Rp 115,000.00 Rp 62,100.00

Batu pecah 2/3 split 0.8100 M3 x Rp 175,000.00 Rp 141,750.00

Rp 607,050.00

Tenaga :

Pekerja 2.0000 Oh x Rp 40,000.00 Rp 80,000.00

Tukang 0.3500 Oh x Rp 45,000.00 Rp 15,750.00

Kepala tukang 0.0350 Oh x Rp - Rp -

Kpl. Kelompok 1.0000 Oh x Rp 45,000.00 Rp 45,000.00

Rp 60,750.00

Rp 667,800.00

B. PEMBESIAN Bahan :

Besi beton 137.5000 Kg x Rp 11,000.00 Rp 1,512,500.00

Kawat beton 2.5000 Kg x Rp 16,000.00 Rp 40,000.00

Rp 1,552,500.00

Tenaga :

Pekerja 8.4375 Oh x Rp 40,000.00 Rp 337,500.00

Tukang 8.4375 Oh x Rp 45,000.00 Rp 379,687.50

Kepala tukang 2.8125 Oh x Rp - Rp -

Rp 379,687.50

Rp 1,932,187.50

C. BEGISTING Bahan :

Kayu tahun 0.4000 M3 x Rp 2,500,000.00 Rp 1,000,000.00

Paku biasa 2" - 5" 4.0000 Kg x Rp 10,000.00 Rp 40,000.00

Rp 1,040,000.00

Tenaga :

Pekerja 2.0000 Oh x Rp 40,000.00 Rp 80,000.00

Tukang 5.0000 Oh x Rp 45,000.00 Rp 225,000.00

Kepala tukang 0.5000 Oh x Rp - Rp -

Kpl. Kelompok 0.1000 Oh x Rp 45,000.00 Rp 4,500.00

Rp 229,500.00

Rp 1,269,500.00

D. PEMELIHARAAN

Tenaga :

Pekerja 4.0000 Oh x Rp 40,000.00 Rp 160,000.00 Rp 160,000.00

Total Cor Beton ...... Rp 4,029,487.50

An.SNI - H.6.1 1 m2 Pasang atap genteng press

Bahan

Genteng press 25.0000 bh x Rp 1,500.00 Rp 37,500.00 Rp 37,500.00

Tenaga

Pekerja 0.1500 Oh x Rp 40,000.00 Rp 6,000.00

Tukang 0.0750 Oh x Rp 45,000.00 Rp 3,375.00

Kepala Tukang 0.0080 Oh x Rp - Rp -

Kpl. Kelompok 0.0080 Oh x Rp 45,000.00 Rp 360.00

Rp 9,735.00

Rp 47,235.00

An.SNI - H.6.4 1 m Pasang atap bubungan/nok genteng

Bahan

Genteng Bubungan 5.0000 bh x Rp 3,000.00 Rp 15,000.00

Portland Cement 8.0000 Kg x Rp 1,200.00 Rp 9,600.00

Pasir Pasang 0.0320 M3 x Rp 115,000.00 Rp 3,680.00

Rp 28,280.00

Tenaga

Pekerja 0.4000 Oh x Rp 40,000.00 Rp 16,000.00

Tukang 0.2000 Oh x Rp 45,000.00 Rp 9,000.00

Kepala Tukang 0.0200 Oh x Rp - Rp -

Kpl. Kelompok 0.0020 Oh x Rp 45,000.00 Rp 90.00

Rp 24,600.00

Rp 52,880.00

An.SNI - H.6.38 1 m2 Pasang atap seng gelombang

Bahan

Seng gelombang 3" x 6" bjls 20 0.7000 Lbr x Rp 45,000.00 Rp 31,500.00

Paku biasa 2" - 5" 0.0200 Kg x Rp 10,000.00 Rp 200.00

Rp 31,700.00

Tenaga

Pekerja 0.1200 Oh x Rp 40,000.00 Rp 4,800.00

Tukang 0.0600 Oh x Rp 45,000.00 Rp 2,700.00

Kepala Tukang 0.0060 Oh x Rp - Rp -

Kpl. Kelompok 0.0060 Oh x Rp 45,000.00 Rp 270.00

Rp 7,770.00

Rp 39,470.00

An.SNI - H.6.39 1 m Pasang atap bubungan/nok seng

Bahan

Seng plat 3" x 6" bjls 20 0.3000 Lbr x Rp 35,000.00 Rp 10,500.00

Paku biasa 2" - 5" 0.0400 Kg x Rp 10,000.00 Rp 400.00

Rp 10,900.00

Tenaga

Pekerja 0.1500 Oh x Rp 40,000.00 Rp 6,000.00

Tukang 0.0700 Oh x Rp 45,000.00 Rp 3,150.00

Kepala Tukang 0.0080 Oh x Rp - Rp -

Kpl. Kelompok 0.0060 Oh x Rp 45,000.00 Rp 270.00

Rp 9,420.00

Rp 20,320.00

An. SNI - I.6.19 1 m2 Pasang list plafond kayu profil

Bahan

Kayu profil 1.0500 Lbr x Rp 20,000.00 Rp 21,000.00

Rp 21,000.00

Tenaga

Pekerja 0.0210 Oh x Rp 40,000.00 Rp 840.00

Tukang 0.0210 Oh x Rp 45,000.00 Rp 945.00

Kepala Tukang 0.0020 Oh x Rp - Rp -

Kpl. Kelompok 0.0010 Oh x Rp 45,000.00 Rp 45.00

Rp 1,830.00

Rp 22,830.00

An.SNI - J.6.2 1 bh Memasang kloset jongkok porselen

Bahan

Kloset jongkok porselen 1.0000 Bh x Rp 100,000.00 Rp 100,000.00

Semen portland 6.0000 Kg x Rp 1,200.00 Rp 7,200.00

Pasir pasang 0.0100 x Rp 115,000.00 Rp 1,150.00

Rp 108,350.00

Tenaga

Pekerja 1.0000 Oh x Rp 40,000.00 Rp 40,000.00

Tukang 1.5000 Oh x Rp 45,000.00 Rp 67,500.00

Kepala Tukang 1.5000 Oh x Rp - Rp -

Kpl. Kelompok 0.1600 Oh x Rp 45,000.00 Rp 7,200.00

Rp 114,700.00

Rp 223,050.00

An.SNI - J.6.27 1 m' Memasang pipa PVC diameter 1" type SNI

Bahan

Pipa PVC 1" 1.0000 M' x Rp 5,850.00 Rp 5,850.00

Perlengkapan 35 % Harga pipa x Rp 2,047.50 Rp 716.62

Tenaga

Pekerja 0.0360 Oh x Rp 40,000.00 Rp 1,440.00

Tukang 0.0600 Oh x Rp 45,000.00 Rp 2,700.00

Kepala Tukang 0.0060 Oh x Rp - Rp -

Kpl. Kelompok 0.0018 Oh x Rp 45,000.00 Rp 81.00

Rp 10,787.63

An.SNI - J.6.28 1 m' Memasang pipa PVC diameter 1 1/2" type SNI

Bahan

Pipa PVC 1 1/2" 1.0000 M' x Rp 13,200.00 Rp 13,200.00

Perlengkapan 35 % Harga pipa x Rp 4,620.00 Rp 1,617.00

Tenaga

Pekerja 0.0360 Oh x Rp 40,000.00 Rp 1,440.00

Tukang 0.0600 Oh x Rp 45,000.00 Rp 2,700.00

Kepala Tukang 0.0060 Oh x Rp - Rp -

Kpl. Kelompok 0.0018 Oh x Rp 45,000.00 Rp 81.00

Rp 19,038.00

An.SNI - J.6.29 1 m' Memasang pipa PVC diameter 2" type SNI

Bahan

Pipa PVC 2" 1.0000 M' x Rp 16,800.00 Rp 16,800.00

Perlengkapan 35 % Harga pipa x Rp 5,880.00 Rp 2,058.00

Tenaga

Pekerja 0.0540 Oh x Rp 40,000.00 Rp 2,160.00

Tukang 0.0900 Oh x Rp 45,000.00 Rp 4,050.00

Kepala Tukang 0.0090 Oh x Rp - Rp -

Kpl. Kelompok 0.0027 Oh x Rp 45,000.00 Rp 121.50

Rp 25,189.50

An.SNI - J.6.31 1 m' Memasang pipa PVC diameter 3" type SNI

Bahan

Pipa PVC 2" 1.0000 M' x Rp 35,020.00 Rp 35,020.00

Perlengkapan 35 % Harga pipa x Rp 12,257.00 Rp 4,289.95

Tenaga

Pekerja 0.0810 Oh x Rp 40,000.00 Rp 3,240.00

Tukang 0.1350 Oh x Rp 45,000.00 Rp 6,075.00

Kepala Tukang 0.0135 Oh x Rp - Rp -

Kpl. Kelompok 0.0041 Oh x Rp 45,000.00 Rp 184.50

Rp 48,809.45

An.SNI - J.6.32 1 m' Memasang pipa PVC diameter 4" type SNI

Bahan

Pipa PVC 2" 1.0000 M' x Rp - Rp -

Perlengkapan 35 % Harga pipa x Rp - Rp -

Tenaga

Pekerja 0.0810 Oh x Rp 40,000.00 Rp 3,240.00

Tukang 0.1350 Oh x Rp 45,000.00 Rp 6,075.00

Kepala Tukang 0.0135 Oh x Rp - Rp -

Kpl. Kelompok 0.0041 Oh x Rp 45,000.00 Rp 184.50

Rp 9,499.50

An.SNI - J.6.33 1 m' Memasang pipa PVC diameter 6" type SNI

Bahan

Pipa PVC 6" 1.0000 M' x Rp - Rp -

Perlengkapan 35 % Harga pipa x Rp - Rp -

Tenaga

Pekerja 0.0810 Oh x Rp 40,000.00 Rp 3,240.00

Tukang 0.1350 Oh x Rp 45,000.00 Rp 6,075.00

Kepala Tukang 0.0135 Oh x Rp - Rp -

Kpl. Kelompok 0.0041 Oh x Rp 45,000.00 Rp 184.50

Rp 9,499.50

M3

An.SNI - M.6.14 1 m2 Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

Bahan

Plamir 0.1000 Kg x Rp 25,000.00 Rp 2,500.00

Cat dasar 0.1000 Kg x Rp 25,000.00 Rp 2,500.00

Cat penutup 2 x 0.2600 Kg x Rp 25,000.00 Rp 6,500.00

Rp 11,500.00

Tenaga

Pekerja 0.0200 Oh x Rp 40,000.00 Rp 800.00

Tukang cat 0.0630 Oh x Rp 45,000.00 Rp 2,835.00

Kepala Tukang 0.0063 Oh x Rp - Rp -

Kpl. Kelompok 0.0025 Oh x Rp 45,000.00 Rp 112.50

Rp 3,747.50

Rp 15,247.50

An.SNI - J.6.21a 1 m' Memasang pipa GI diameter 1" crossing jalan

Bahan

Pipa GI 1" 1.2000 M' x Rp 37,500.00 Rp 45,000.00

Perlengkapan 35 % Harga pipa x Rp 13,125.00 Rp 4,593.75

Tenaga

Pekerja 0.0540 Oh x Rp 40,000.00 Rp 2,160.00

Tukang 0.0900 Oh x Rp 45,000.00 Rp 4,050.00

Kepala Tukang 0.0090 Oh x Rp - Rp -

Kpl. Kelompok 0.0027 Oh x Rp 45,000.00 Rp 121.50

Beton tumbuk 1pc : 3ps : 5kr 0.0300 x Rp 554,500.00 Rp 16,635.00

Rp 72,560.25

An.SNI - J.6.22a 1 m' Memasang pipa GI diameter 1 1/2" crossing jalan

Bahan

Pipa GI 1 1/2" 1.2000 M' x Rp 66,666.67 Rp 80,000.00

Perlengkapan 35 % Harga pipa x Rp 23,333.33 Rp 8,166.67

Tenaga

Pekerja 0.1080 Oh x Rp 40,000.00 Rp 4,320.00

Tukang 0.1800 Oh x Rp 45,000.00 Rp 8,100.00

Kepala Tukang 0.0180 Oh x Rp - Rp -

Kpl. Kelompok 0.0054 Oh x Rp 45,000.00 Rp 243.00

Beton tumbuk 1pc : 3ps : 5kr 0.0300 x Rp 554,500.00 Rp 16,635.00

Rp 117,464.67

An.SNI - J.6.22b 1 m' Memasang pipa GI diameter 2" crossing jalan

Bahan

Pipa GI 2" 1.2000 M' x Rp 75,000.00 Rp 90,000.00

Perlengkapan 35 % Harga pipa x Rp 26,250.00 Rp 9,187.50

Tenaga

Pekerja 0.1080 Oh x Rp 40,000.00 Rp 4,320.00

Tukang 0.1800 Oh x Rp 45,000.00 Rp 8,100.00

Kepala Tukang 0.0180 Oh x Rp - Rp -

Kpl. Kelompok 0.0054 Oh x Rp 45,000.00 Rp 243.00

Beton tumbuk 1pc : 3ps : 5kr 0.0300 x Rp 554,500.00 Rp 16,635.00

Rp 128,485.50

An.SNI - J.6.35 1 bh Memasang kran diameter 3/4" atau 1/2"

Bahan

Kran air 1.0000 Bh x Rp 15,000.00 Rp 15,000.00

Seal tape 0.0250 Bh x Rp 5,000.00 Rp 125.00

Rp 15,125.00

Tenaga

Pekerja 0.0100 Oh x Rp 40,000.00 Rp 400.00

Tukang 0.1000 Oh x Rp 45,000.00 Rp 4,500.00

Kepala Tukang 0.0100 Oh x Rp - Rp -

Kpl. Kelompok 0.0050 Oh x Rp 45,000.00 Rp 225.00

Rp 5,125.00

Rp 20,250.00

An.SNI - L.6.44.1 Pasang lantai keramik 20 x 20 cm

Bahan

Ubin keramik 20 x 20 cm 25.0000 Bh x Rp 1,520.00 Rp 38,000.00

Semen Portland 11.3800 Kg x Rp 1,200.00 Rp 13,656.00

Pasir pasang 0.0420 x Rp 115,000.00 Rp 4,830.00

Semen warna 1.5000 Kg x Rp 6,500.00 Rp 9,750.00

Rp 66,236.00

Tenaga

Pekerja 0.6200 Oh x Rp 40,000.00 Rp 24,800.00

Tukang 0.3500 Oh x Rp 45,000.00 Rp 15,750.00

Kepala Tukang 0.0350 Oh x Rp - Rp -

Kpl. Kelompok 0.0300 Oh x Rp 45,000.00 Rp 1,350.00

Rp 41,900.00

Rp 108,136.00

An.SNI - L.6.44.2 Pasang dinding keramik 20 x 25 cm

Bahan

Keramik 20 x 25 cm 20.0000 Bh x Rp 1,900.00 Rp 38,000.00

Semen Portland 11.3800 Kg x Rp 1,200.00 Rp 13,656.00

Pasir pasang 0.0480 x Rp 115,000.00 Rp 5,520.00

Semen warna 1.5000 Kg x Rp 6,500.00 Rp 9,750.00

Rp 66,926.00

Tenaga

Pekerja 0.6200 Oh x Rp 40,000.00 Rp 24,800.00

Tukang 0.3500 Oh x Rp 45,000.00 Rp 15,750.00

Kepala Tukang 0.0350 Oh x Rp - Rp -

Kpl. Kelompok 0.0300 Oh x Rp 45,000.00 Rp 1,350.00

Rp 41,900.00

Rp 108,826.00

M3

M3

M3

1 m2

M3

1 m2

M3

An.SNI - M.6.14 1 m2 Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

Bahan

Plamir 0.1000 Kg x Rp 25,000.00 Rp 2,500.00

Cat dasar 0.1000 Kg x Rp 29,500.00 Rp 2,950.00

Cat penutup 2 x 0.2600 Kg x Rp 29,500.00 Rp 7,670.00

Rp 13,120.00

Tenaga

Pekerja 0.0200 Oh x Rp 40,000.00 Rp 800.00

Tukang 0.0630 Oh x Rp 45,000.00 Rp 2,835.00

Kepala Tukang 0.0063 Oh x Rp - Rp -

Kpl. Kelompok 0.0025 Oh x Rp 45,000.00 Rp 112.50

Rp 3,747.50

Rp 16,867.50

HARGA SATUAN SUMUR BOR DALAM

Desa : Sumber Agung

Kecamatan : Klego

Kabupaten : Boyolali

Provinsi : Jawa Tengah

Program : Pamsimas HIK 2013

NO. URAIAN SATUAN KETERANGAN

A. TENAGA

1 Koordinator OH 50,000

2 Hydrogeologist OH 50,000

3 Driller OH 50,000

4 Ass.Driller OH 45,000

5 Crew OH 40,000

6 Mekanik OH 45,000

7 Pekerja OH 35,000 8 Tukang sambung pipa OH 40,000 9 Penjaga malam OH 35,000

10 Operator pompa OH 40,000 B. BAHAN

1 Solar Ltr 4,500 2 Olie mesin Ltr 27,000 3 Olie hidrolis Ltr 27,000 4 Stemvet Kg 39,000 5 Bentonite Kg 15,000 6 Grease Kg 39,000 7 Lem PVC Kg 50,000 8 Paku skrup fisher Bh 5,000 9 Gravel pack m3 130,000

10 Pasir m3 115,000 11 Semen Kg 1,200 12 Alat alat tulis Ls 4,500 13 Jerigen plastik Bh 10,000 14 Pipa PVC AW diameter 4" m' 52,000 15 Screen PVC AW diameter 4" m' 77,000

16 Unit 15,190,000

17 Pengadaan panel pompa 1 phase 1,5 KW Unit 2,500,000 18 Pengadaan stabilizer voltage ( starvolt 3500 VA 1 Phase ) Bh 3,000,000 19 Kabel pompa NYYHY 3 x 2,5 mm m' 24,000 20 Kabel elektroda NYYHY 3 x 1,5 mm m' 10,000 21 Isolasi 3 m bh 36,000 22 Elektroda massa bh 30,000 23 Pipa pompa GI kelas medium A DN 1 1/2" m' 65,000 24 Pengadaan shock GI DN 1 1/2" bh 14,000 25 Well cover DN 4" x 1 1/2" bh 100,000 26 Pipa pengaman pipa inlet GI DN 4" medium B m' 75,000 27 Knee GI DN 1 1/2" 45' bh 16,000 28 Knee GI DN 1 1/2" 90' bh 20,000 29 Pengadaan double nipple GI DN 1 1/2" Bh 16,000 30 Pengadaan stop kran DN 1 1/2" Bh 160,000 31 Pengadaan watermoor GI DN 1 1/2" Bh 40,000 32 Check valve DN 1 1/2" Bh 400,000 33 Pengadaan TBA / Sealtape Bh 3,500 34 Pemasangan pompa lengkap dengan aksesoris unit 600,000 35 Dudukan panel , stabilizer , meter listrik Unit 700,000 36 Murbaut Bh 3,000 37 box bh 500,000 38 Pemasangan PB 3500 VA + kabel LPTC 3 x 70 + Unit 5,000,000

N50 mm + aksesoris + sertifikal BTLC. BIAYA-BIAYA LAIN

1 Depresiasi Drilling rig Unit/hr 300,000 2 Depresiasi mesin las Unit/hr 100,000 3 Alat Bantu Ls 10,000 4 Depresiasi mesin pompa uji Hari 150,000 5 Depresiasi EC meter Unit/hr 70,000 6 Depres. PH meter & thermometer Unit/hr 60,000 7 Depresiasi Water sounding Unit/hr 550,000 8 Biaya pengiriman contoh air Ls 100,000 9 Biaya analisa air set 200,000

10 Logging Test Ls 2,500,000 11 Pembuatan bak sirkulasi Unit 350,000

HARGASATUAN

( Rp. )

Pengadaan pompa submesible stainless steel, H=40 m setara Grundfosdiameter 2" kapasitas 8 m3/jam 1,5 KW 1 Phase x 220 V

ANALISA PEKERJAAN

Desa : Sumber AgungKecamatan : KlegoKabupaten : BoyolaliProvinsi : Jawa TengahProgram : Pamsimas HIK 2013

PEMBUATAN SUMUR BOR KEDALAMAN 100 M'

1 I.A.2.a.1 Pengeboran Lubang Pandu/Pilot Hole diameter 4" kedalaman 0 - 40 m'I TENAGA

0.0000 hr Koordinator 50,000.00 0.00

1.0000 hr Driller 50,000.00 50,000.00

1.0000 hr Ass.Driller 45,000.00 45,000.00

3.0000 hr Crew 40,000.00 120,000.00

1.0000 hr Mekanik 45,000.00 45,000.00

II BAHAN75.0000 Ltr Solar 4,500.00 337,500.00

1.5000 Ltr Olie Mesin 27,000.00 40,500.00

1.5000 Ltr Olie Hidrolis 27,000.00 40,500.00

1.5000 Kg Stemvet 39,000.00 58,500.00

25.0000 Kg Bentonite 15,000.00 375,000.00

260,000.00 852,000.00 1,112,000.00

III PERALATAN1.0000 hr Depresiasi Drilling Rig 300,000.00 300,000.00

1,412,000.00

Kecepatan Pengeboran/hari (m') Biaya Harga Satuan Harga Satuan Harga Satuan Pakai

(Rp) per m' (Rp) /m' dibulatkan(Rp) (Rp)

8.0000 1,412,000.00 176,500.00 176,500.00 176,500.00

* kuantitas untuk upah dihitung dalam org perhari2 I.A.2.a.2 Pengeboran Lubang Pandu/Pilot Hole diameter 4" kedalaman 40 - 80 m'

I TENAGA0.0000 hr Koordinator 50,000.00 0.00

1.0000 hr Driller 50,000.00 50,000.00

1.0000 hr Ass.Driller 45,000.00 45,000.00

2.0000 hr Crew 40,000.00 80,000.00

1.0000 hr Mekanik 45,000.00 45,000.00

II BAHAN75.0000 Ltr Solar 4,500.00 337,500.00

1.5000 Ltr Olie Mesin 27,000.00 40,500.00

1.5000 Ltr Olie Hidrolis 27,000.00 40,500.00

1.5000 Kg Stemvet 39,000.00 58,500.00

29.0000 Kg Bentonite 15,000.00 435,000.00

220,000.00 912,000.00 1,132,000.00

III PERALATAN1.0000 hr Depresiasi Drilling Rig 300,000.00 300,000.00

1,432,000.00

Kecepatan Pengeboran/hari (m') Biaya Harga Satuan Harga Satuan Harga Satuan Pakai

(Rp) per m' (Rp) /m' dibulatkan(Rp) (Rp)

7.0000 1,432,000.00 204,571.43 204,570.00 204,570.00

*kuantitas untuk upah dihitung dalam org perhari3 I.A.2.a.3 Pengeboran Lubang Pandu/Pilot Hole diameter 4" kedalaman 80 - 100 m'

I TENAGA0.0000 hr Koordinator 50,000.00 0.00

1.0000 hr Driller 50,000.00 50,000.00

1.0000 hr Ass.Driller 45,000.00 45,000.00

2.0000 hr Crew 40,000.00 80,000.00

1.0000 hr Mekanik 45,000.00 45,000.00

II BAHAN80.0000 Ltr Solar 4,500.00 360,000.00

1.5000 Ltr Olie Mesin 27,000.00 40,500.00

1.5000 Ltr Olie Hidrolis 27,000.00 40,500.00

1.5000 Kg Stemvet 39,000.00 58,500.00

35.0000 Kg Bentonite 15,000.00 525,000.00

220,000.00 1,024,500.00 1,244,500.00

III PERALATAN1.0000 hr Depresiasi Drilling Rig 300,000.00 300,000.00

1,544,500.00

Kecepatan Pengeboran/hari (m') Biaya Harga Satuan Harga Satuan Harga Satuan Pakai

(Rp) per m' (Rp) /m' dibulatkan(Rp) (Rp)

6.0000 1,544,500.00 257,416.67 257,410.00 257,410.00

*kuantitas untuk upah dihitung dalam org perhari

4 I.A.2.b.1 Reaming Lubang diameter 4" ke 8" kedalaman 0 - 40 m'I TENAGA

0.0000 hr Koordinator 50,000.00 0.00

1.0000 hr Driller 50,000.00 50,000.00

1.0000 hr Ass.Driller 45,000.00 45,000.00

2.0000 hr Crew 40,000.00 80,000.00

1.0000 hr Mekanik 45,000.00 45,000.00

II BAHAN70.0000 Ltr Solar 4,500.00 315,000.00

1.5000 Ltr Olie Mesin 27,000.00 40,500.00

1.5000 Ltr Olie Hidrolis 27,000.00 40,500.00

1.5000 Kg Stemvet 39,000.00 58,500.00

25.0000 Kg Bentonite 15,000.00 375,000.00

220,000.00 829,500.00 1,049,500.00

III PERALATAN1.0000 hr Depresiasi Drilling Rig 300,000.00 300,000.00

1,349,500.00

Kecepatan Pengeboran/hari (m') Biaya Harga Satuan Harga Satuan Harga Satuan Pakai

(Rp) per m' (Rp) /m' dibulatkan(Rp) (Rp)

10.0000 1,349,500.00 134,950.00 134,950.00 134,950.00

*kuantitas untuk upah dihitung dalam org perhari5 I.A.2.b.2 Reaming Lubang diameter 4" ke 8" kedalaman 40- 80 m'

I TENAGA0.0000 hr Koordinator 50,000.00 0.00

1.0000 hr Driller 50,000.00 50,000.00

1.0000 hr Ass.Driller 45,000.00 45,000.00

2.0000 hr Crew 40,000.00 80,000.00

1.0000 hr Mekanik 45,000.00 45,000.00

II BAHAN75.0000 Ltr Solar 4,500.00 337,500.00

1.5000 Ltr Olie Mesin 27,000.00 40,500.00

1.5000 Ltr Olie Hidrolis 27,000.00 40,500.00

1.5000 Kg Stemvet 39,000.00 58,500.00

25.0000 Kg Bentonite 15,000.00 375,000.00

220,000.00 852,000.00 1,072,000.00

III PERALATAN1.0000 hr Depresiasi Drilling Rig 300,000.00 300,000.00

1,372,000.00

Kecepatan Pengeboran/hari (m') Biaya Harga Satuan Harga Satuan Harga Satuan Pakai

(Rp) per m' (Rp) /m' dibulatkan(Rp) (Rp)

9.0000 1,372,000.00 152,444.44 152,440.00 152,440.00

*kuantitas untuk upah dihitung dalam org perhari6 I.A.2.b.3 Reaming Lubang diameter 4" ke 8" kedalaman 80- 100 m'

I TENAGA0.0000 hr Koordinator 50,000.00 0.00

1.0000 hr Driller 50,000.00 50,000.00

1.0000 hr Ass.Driller 45,000.00 45,000.00

2.0000 hr Crew 40,000.00 80,000.00

1.0000 hr Mekanik 45,000.00 45,000.00

II BAHAN75.0000 Ltr Solar 4,500.00 337,500.00

1.5000 Ltr Olie Mesin 27,000.00 40,500.00

1.5000 Ltr Olie Hidrolis 27,000.00 40,500.00

1.5000 Kg Stemvet 39,000.00 58,500.00

29.0000 Kg Bentonite 15,000.00 435,000.00

220,000.00 912,000.00 1,132,000.00

III PERALATAN1.0000 hr Depresiasi Drilling Rig 300,000.00 300,000.00

1,432,000.00

Kecepatan Pengeboran/hari (m') Biaya Harga Satuan Harga Satuan Harga Satuan Pakai

(Rp) per m' (Rp) /m' dibulatkan(Rp) (Rp)

8.0000 1,432,000.00 179,000.00 179,000.00 179,000.00

*kuantitas untuk upah dihitung dalam org perhari7 I.A.3.a Pemasangan Pipa PVC dan screen PVC 4" dalam m'

I TENAGA0.0000 hr Koordinator 50,000.00 0.00

0.0330 hr Driller 50,000.00 1,650.00

0.0330 hr Ass.Driller 45,000.00 1,485.00

0.1000 hr Crew 40,000.00 4,000.00

0.0670 hr Pekerja 35,000.00 2,345.00

0.0330 hr Tukang sambung pipa PVC 40,000.00 1,320.00

II BAHAN3.0000 Ltr Solar 4,500.00 13,500.00

0.1000 Ltr Olie Mesin 27,000.00 2,700.00

0.0670 Kg Grease 39,000.00 2,613.00

0.0080 Kg Lem PVC 50,000.00 400.00

0.7500 bh Paku sekrup fisher 5,000.00 3,750.00

10,800.00 22,963.00 33,763.00

III PERALATAN0.0330 hr Depresiasi Drilling Rig 300,000.00 9,900.00

total harga per m' 43,663.00

8 I.A.3.b Pemasangan Gravel Pack I TENAGA

0.0000 hr Koordinator 50,000.00 0.00

0.0000 hr Driller 50,000.00 0.00

0.0000 hr Ass.Driller 45,000.00 0.00

0.5000 hr Tukang 40,000.00 20,000.00

0.7500 hr Pekerja 35,000.00 26,250.00

II BAHAN0.0000 Ltr Solar 4,500.00 -

0.0000 Ltr Olie Mesin 27,000.00 -

1.0000 m3 Gravel pack 130,000.00 130,000.00

46,250.00 130,000.00 176,250.00

III PERALATAN1.0000 Ls Alat Bantu 10,000.00 10,000.00

0.2500 hr Depresiasi Mesin Las - 0.00

total harga per m3 186,250.00

9 I.A.3.c Pengadaan dan Penyemenan (Grouting)I TENAGA

0.0000 hr Koordinator 50,000.00 0.00

0.0000 hr Driller 50,000.00 0.00

0.0000 hr Ass.Driller 45,000.00 0.00

0.6660 hr Tukang 40,000.00 26,640.00

0.9990 hr Pekerja 35,000.00 34,965.00

II BAHAN0.3000 m3 Pasir 115,000.00 34,500.00

### kg Semen 1,200.00 600,000.00

1.0000 Ls Alat bantu 10,000.00 10,000.00

61,605.00 644,500.00 706,105.00

total harga per m3 706,105.00

10 I.B.1 Pengurasan SumurI TENAGA

0.0000 hr Koordinator 50,000.00 0.00

1.0000 hr Hidrogeologist 50,000.00 50,000.00

1.0000 hr Driller 50,000.00 50,000.00

3.0000 hr Crew 40,000.00 120,000.00

1.0000 hr Penjaga malam 35,000.00 35,000.00

II BAHAN### Ltr Solar 4,500.00 450,000.00

1.0000 Ltr Olie Mesin 27,000.00 27,000.00

0.0000 Ls Alat-alat tulis 4,500.00 -

255,000.00 477,000.00 732,000.00

III PERALATAN1.0000 hr Depresiasi Mesin Pompa Uji 150,000.00 150,000.00

total harga per unit (lumpsum) 882,000.00

11 I.B.2 Pumping TestI TENAGA

0.0000 hr Koordinator 50,000.00 0.00

0.0630 hr Hidrogeologist 50,000.00 3,150.00

0.0940 hr Operator pompa 40,000.00 3,760.00

0.2500 hr Crew 40,000.00 10,000.00

0.2500 hr Penjaga malam 35,000.00 8,750.00

II BAHAN3.1250 Ltr Solar 4,500.00 14,062.50

0.0310 Ltr Olie Mesin 27,000.00 837.00

1.0000 Ls Alat-alat tulis 4,500.00 4,500.00

25,660.00 19,399.50 45,059.50

III PERALATAN0.0310 hr Depresiasi Mesin Pompa Uji 150,000.00 4,650.00

0.0210 hr Depresiasi EC meter 70,000.00 1,470.00

0.0210 hr Depresiasi pH meter & Thermomete 60,000.00 1,260.00

0.0420 hr Depresiasi Water Sounding 550,000.00 23,100.00

30,480.00

total harga per jam 75,539.50

12 I.B.3 Pemeriksaan Kualitas Air ke LaboratoriumI TRANSPORT

1.0000 Ls Biaya pengiriman contoh air 100,000.00 100,000.00

1.0000 set Biaya analisa air 200,000.00 200,000.00

II BAHAN / ALAT2.0000 bh Jerigen Plastik 10,000.00 20,000.00

300,000.00 20,000.00 320,000.00

total harga per jam 320,000.00

13 G.6.1 Cor beton 1 : 3 : 5I TENAGA

0.2500 hr Tukang 40,000.00 10,000.00

1.6500 hr Pekerja 35,000.00 57,750.00

II BAHAN### kg Semen 1,200.00 261,600.00

0.5200 m3 Pasir 115,000.00 59,800.00

0.8700 m3 Gravel pack 130,000.00 113,100.00

67,750.00 434,500.00 502,250.00

total harga per m3 502,250.00

TAKE OF SHEETPROGRAM PAMSIMAS

TAHUN 2013Desa : Sumber AgungKecamatan : KlegoKabupaten : BoyolaliProvinsi : Jawa TengahProgram : Pamsimas HIK 2013

NO. GAMBAR SKET PERHITUNGAN HASIL

1. RESEVOAR ( 3X 2 )

1. Pengukuran & pmsngn bouplank Vol 3 x 3 9 m

bouwplank (keliling lahan)

Kebutuhan Bahan & upah :

Kayu 5/7 0.0120 = 0.1080

Paku biasa 2" - 5" 0.0200 = 0.1800

Kayu papan 3/20 0.0070 = 0.0630

Pekerja 0.1000 = 0.9000

Tukang 0.1000 = 0.9000

Kpl. Kelompok 0.0050 = 0.0450

0 0

2. Pembersihan lahan Vol 3 x 3 9 m2

& perataan (luas lahan)

Kebutuhan Bahan & upah :

Pekerja 0.1000 = 0.9000

Kpl. Kelompok 0.0500 = 0.4500

3. Pembuatan bak adukan Vol 2 bh

Kebutuhan Bahan & upah :

Kayu papan 3/20 0.0360 = 0.0720

Paku biasa 2" - 5" 0.0800 = 0.1600

Kayu 5/7 0.0105 = 0.0210

Tukang 0.3000 = 0.6000

4. Pembuatan stegger Vol 3 x 3 x 3 27 m2

Kebutuhan Bahan & upah :

Bambu Ø 6 - 8/ 6 m 1.0000 = 27.0000

Tali ijuk 0.2500 = 6.7500

Pekerja 0.0170 = 0.4590

Tukang 0.2500 = 6.7500

Kpl. Kelompok 0.0130 = 0.3510

5. Galian tanah Vol 0.7 x 0.7 x 2 X 3 5.88 m3

Kebutuhan Bahan & upah : 1.47 m3 (urugan kmbli)

Pekerja 0.4000 = 2.3520

Kpl. Kelompok 0.0400 = 0.2352

Urugan kembali

Pekerja 0.1920 = 0.2822

Kpl. Kelompok 0.0190 = 0.0279

6. Urugan pasir Vol 1.3 x 1.3 x 0.1 x 3 0.507 m3

Kebutuhan Bahan & upah :

Pasir urug 1.2000 = 0.6084

Pekerja 0.3000 = 0.1521

Kpl. Kelompok 0.0100 = 0.0051

7. Beton tumbuk lantai Vol 1.3 x 1.3 x 0.1 x 3 0.507 m3

kerja 1 : 3 : 5

Kebutuhan Bahan & upah : 0 0

Semen Portland 218.0000 = 110.5260

Pasir pasang 0.5200 = 0.2636

Batu pecah 2/3 split 0.8700 = 0.4411

Pekerja 1.6500 = 0.8366

Tukang 0.2500 = 0.1268

Kpl. Kelompok 0.0800 = 0.0406

8. Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps

9. Kolom 15 x 15 Vol 0.15 x 0.15 x 3 x 4 0.27 m3

10. Balok sloof 20 x 20 Vol 0.2 x 0.2 x 2.4 x 4 0.384 m3

11. Balok 15 x 20 Vol 0.2 x 0.15 x 3 x 6 0.54 m3

14. Beton plat atas Vol 3 x 3 x 0.15 - 0.8 x 0.8 x 0.1 1.286 m3 2.48 m3

Kebutuhan Bahan & upah : 1.35 0.064

Adukan

Semen Portland 336.0000 = 833.2800

Pasir pasang 0.5400 = 1.3392

Batu pecah 2/3 split 0.8100 = 2.0088

Pekerja 2.0000 = 4.9600

Tukang 0.3500 = 0.8680

Kpl. Kelompok 1.0000 = 2.4800

Pembesian

Besi beton 137.5000 = 341.0000

Kawat beton 2.5000 = 6.2000

Pekerja 8.4375 = 20.9250

Tukang 8.4375 = 20.9250

Begisting

1 m2

Kayu tahun 0.4000 = 0.9920

Paku 4.0000 = 9.9200

Pekerja 2.0000 = 4.9600

Tukang 5.0000 = 12.4000

Kpl. Kelompok 0.1000 = 0.2480

Pemeliharaan

Pekerja 4.0000 = 9.9200

1.35 0.064

15. Plesteran 1 : 4 Vol 0.3 x 3 x 3 x 4 = 10.8 m2 klm

2 x 3 x 3 = 18 m2 ddng

3 x 3 - 0.8 x 0.8 = 8.36 m2 atp 37.16 m2

Kebutuhan Bahan & upah : 9 0.64

Semen Portland 5.2000 = 193.2320

Pasir pasang 0.0200 = 0.7432

Pekerja 0.2000 = 7.4320

Tukang 0.1500 = 5.5740

Kpl. Kelompok 0.0100 = 0.3716

16. Pengecatan Vol 37.16 m2

Kebutuhan Bahan & upah :

Plamir 0.1000 = 3.7160

Cat dasar 0.1000 = 3.7160

Cat penutup 2 x 0.2600 = 9.6616

Pekerja 0.0200 = 0.7432

Tukang 0.0630 = 2.3411

Kpl. Kelompok 0.0025 = 0.0929

Lihat gambar detail 2. KRAN UMUM

1. Galian tanah Vol 0.15 x 0.2 x 2 x 2 = 0.12 m3

0.15 x 0.2 x 1.7 x 2 = 0.102 m3

0.3 x 0.5 x 1 x 1 = 0.15 m3 0.372 m3

Kebutuhan Bahan & upah :

Pekerja 0.4000 = 0.1488

Kpl. Kelompok 0.0400 = 0.0149

2. Pasir urug Vol 0.1 x 1.6 x 1.6 x 1 0.256 m3

Kebutuhan Bahan & upah :

Pasir urug 1.2000 = 0.3072

Pekerja 0.3000 = 0.0768

Kpl. Kelompok 0.0100 = 0.0026

3. Pasangan bata 1 : 4 Vol 0.4 x 2 x 2 = 1.6 m2

0.4 x 1.7 x 2 = 1.36 m2 2.96 m2

Kebutuhan Bahan & upah : 0

Bata merah 5 x 11 x 22 cm 70.0000 = 207.2000

Semen Portland 11.5000 = 34.0400

Pasir pasang 0.0430 = 0.1273

Pekerja 0.3200 = 0.9472

Tukang 0.1000 = 0.2960

Kpl. Kelompok 0.0150 = 0.0444

4. Beton tumbuk 1 : 3 : 5 Vol 0.2 x 1.7 x 1.7 = 0.578 m3

0.7 + 0.8 x 0.75 x 0.3 = 0.1687 m3

2 0.75

0.3 x 0.5 x 1 = 0.15 m3 0.8968 m3

Kebutuhan Bahan & upah : 0

Semen Portland 218.0000 = 195.4915

Pasir pasang 0.5200 = 0.4663

Batu pecah 2/3 split 0.8700 = 0.7802

Pekerja 1.6500 = 1.4796

Tukang 0.2500 = 0.2242

Kpl. Kelompok 0.0800 = 0.0717

5. Plesteran 1 : 4 Vol 0.2 x 2 x 4 x 1 = 1.6 m2

0.2 x 1.7 x 4 x 1 = 1.36 m2

0.15 x 4 x 1 x 1 = 0.6 m2

0.15 x 3.4 x 1 x 1 = 0.51 m2

0.22 x 4 x 0.75 x 1 = 0.66 m2 4.73 m2

Kebutuhan Bahan & upah :

Semen Portland 5.2000 = 24.5960

Pasir pasang 0.0200 = 0.0946

Pekerja 0.2000 = 0.9460

Tukang 0.1500 = 0.7095

Kpl. Kelompok 0.0100 = 0.0473

6. Pengecatan Vol 4.73 m2

Kebutuhan Bahan & upah :

Plamir 0.1000 = 0.4730

Cat dasar 0.1000 = 0.4730

Cat penutup 2 x 0.2600 = 1.2298

Pekerja 0.0200 = 0.0946

Tukang 0.0630 = 0.2980

Kpl. Kelompok 0.0025 = 0.0118

Lihat gambar detail 3. PENGADAAN & PEMASANGAN PIPA

Diameter 1'' 560Pekerja 0.0360 = 20.1600

Tukang 0.0600 = 33.6000

Kepala Tukang 0.0060 = 3.3600

Kpl. Kelompok 0.0018 = 1.0080

Kebutuhan Bahan & upah :

Semen Portland 218.0000 = - 0.03 x 0 = 0

Pasir pasang 0.5200 = -

Batu pecah 2/3 split 0.8700 = -

Pekerja 1.6500 = -

Tukang 0.2500 = -

Kpl. Kelompok 0.0800 = -

Diameter 1 1/2'' 925Pekerja 0.0360 = 33.3000

Tukang 0.0600 = 55.5000

Kepala Tukang 0.0060 = 5.5500

Kpl. Kelompok 0.0018 = 1.6650

Kebutuhan Bahan & upah :

Semen Portland 218.0000 = - 0.03 x 0 = 0

Pasir pasang 0.5200 = -

Batu pecah 2/3 split 0.8700 = -

Pekerja 1.6500 = -

Tukang 0.2500 = -

Kpl. Kelompok 0.0800 = -

Diameter 2'' 855Pekerja 0.0540 = 46.1700

Tukang 0.0900 = 76.9500

Kepala Tukang 0.0090 = 7.6950

Kpl. Kelompok 0.0027 = 2.3085

Kebutuhan Bahan & upah :

Semen Portland 218.0000 = - 0.03 x 0 = 0

Pasir pasang 0.5200 = -

Batu pecah 2/3 split 0.8700 = -

Pekerja 1.6500 = -

Tukang 0.2500 = -

Kpl. Kelompok 0.0800 = -

Diameter 2 1/2'' 0Pekerja 0.0540 = -

Tukang 0.0900 = -

Kepala Tukang 0.0090 = -

Kpl. Kelompok 0.0027 = -

Kebutuhan Bahan & upah :

Semen Portland 218.0000 = - 0.03 x 0 = 0

Pasir pasang 0.5200 = -

Batu pecah 2/3 split 0.8700 = -

Pekerja 1.6500 = -

Tukang 0.2500 = -

Kpl. Kelompok 0.0800 = -

Diameter 3'' 0Pekerja 0.0540 = -

Tukang 0.0900 = -

Kepala Tukang 0.0090 = -

Kpl. Kelompok 0.0027 = -

Kebutuhan Bahan & upah :

Semen Portland 218.0000 = - 0.03 x 0 = 0

Pasir pasang 0.5200 = -

Batu pecah 2/3 split 0.8700 = -

Pekerja 1.6500 = -

Tukang 0.2500 = -

Kpl. Kelompok 0.0800 = -

2. GALIAN PIPA Volume Galian 351 m3

Pekerja 0.4000 = 140.4000

Kpl. Kelompok 0.0400 = 14.0400

Rekap crossing Rekap pas. Pipa

Semen Portland - Pekerja 240.0300

Pasir pasang - Tukang 166.0500

Batu pecah 2/3 split - Kepala Tukang 16.6050

Pekerja - Kpl. Kelompok 19.0215

Tukang -

Kpl. Kelompok -

TAKE OF SHEETPROGRAM PAMSIMAS

TAHUN 2013Desa : Sumber AgungKecamatan : KlegoKabupaten : BoyolaliProvinsi : Jawa TengahProgram : Pamsimas HIK 2013

NO. GAMBAR SKET PERHITUNGAN HASIL

Lihat gambar detail 1. KM / WC (3 unit)

1. Pengukuran & pmsngn bouplank Vol 11 + 6 17 m

bouwplank (keliling lahan)

Kebutuhan Bahan & upah :

Kayu 5/7 0.0120 = 0.2040

Paku biasa 2" - 5" 0.0200 = 0.3400

Kayu papan 3/20 0.0070 = 0.1190

Pekerja 0.1000 = 1.7000

Tukang 0.1000 = 1.7000

Kpl. Kelompok 0.0050 = 0.0850

0 0

2. Pembersihan lahan Vol 5.5 x 3 16.5 m2

& perataan (luas lahan)

Kebutuhan Bahan & upah :

Pekerja 0.1000 = 1.6500

Kpl. Kelompok 0.0500 = 0.8250

3. Pembuatan bak adukan Vol 1 bh

Kebutuhan Bahan & upah :

Kayu papan 3/20 0.0360 = 0.0360

Paku biasa 2" - 5" 0.0800 = 0.0800

Kayu 5/7 0.0105 = 0.0105

Tukang 0.3000 = 0.3000

4. Galian tanah Vol 1 x 1 x 5.5 x 2 = 11 m3

Vol 1 x 1 x 3 x 4 = 12 m3

23 m3

Kebutuhan Bahan & upah : (urugan kmbli) 5.75 m3

Pekerja 0.4000 = 9.2000

Kpl. Kelompok 0.0400 = 0.9200

Urugan kembali

Pekerja 0.1920 = 1.1040

Kpl. Kelompok 0.0190 = 0.1093

5. Pas. batu blonos/kali Vol 0.3 + 0.8 x 0.8 x 5.5 x 2 = 4.84 m3

2 0.55

Vol 0.3 + 0.8 x 0.8 x 3 x 4 = 5.28 m3

2 0.55 10.12 m3

Kebutuhan Bahan & upah :

Batu blonos/kali 1.1000 = 11.1320

Semen Portland 163.0000 = 1,649.5600

Pasir pasang 0.5200 = 5.2624

Pekerja 1.5000 = 15.1800

Tukang 0.6000 = 6.0720

Kpl. Kelompok 0.0750 = 0.7590

6. Urugan pasir Vol 0.1 x 1 x 17 1.7 m3

Kebutuhan Bahan & upah :

Pasir urug 1.2000 = 2.0400

Pekerja 0.3000 = 0.5100

Kpl. Kelompok 0.0100 = 0.0170

7. Cor beton sloof, kolom, ring balk & Vol 0.15 x 0.15 x 3.4 x 4 = 0.306 m3

plat 1 : 2 : 3 Vol 0.15 x 0.15 x 2.6 x 4 = 0.234 m3

Vol 0.15 x 0.15 x 2 x 9 = 0.405 m3

Vol 0.15 x 0.15 x 4.5 x 2 = 0.202 m3

Vol 0.15 x 0.15 x 3 x 2 = 0.135 m3

Vol 0.1 x 2 x 2 x 1 = 0.4 m3

1.6825 m3

Kebutuhan Bahan & upah : 0.08 0

Adukan

Semen Portland 336.0000 = 565.3200

Pasir pasang 0.5400 = 0.9086

Batu pecah 2/3 split 0.8100 = 1.3628

Pekerja 2.0000 = 3.3650

Tukang 0.3500 = 0.5889

Kpl. Kelompok 1.0000 = 1.6825

Pembesian

Besi beton 137.5000 = 231.3437

Kawat beton 2.5000 = 4.2063

Pekerja 8.4375 = 14.1961

Tukang 8.4375 = 14.1961

Begisting

Kayu tahun 0.4000 = 0.6730

Paku 4.0000 = 6.7300

Pekerja 2.0000 = 3.3650

Tukang 5.0000 = 8.4125

Kpl. Kelompok 0.1000 = 0.1683

Pemeliharaan

Pekerja 4.0000 = 6.7300

8. Pasangan bata 1 : 4 Vol 2 x 3.4 x 2 = 13.6 m2

Vol 2 x 2.6 x 2 = 10.4 m2

Vol 4.5 x 2.6 x 2 - 0.6 x 2 x 3 = 19.8 m2

Vol 0.8 x 1.5 x 2 = 2.4 m2

Vol 0.5 x 2 x 0.5 x 1 = 0.5 m2

46.7 m2

Kebutuhan Bahan & upah : 0

Bata merah 5 x 11 x 22 cm 70.0000 = 3,269.0000

Semen Portland 11.5000 = 537.0500

Pasir pasang 0.0430 = 2.0081

Pekerja 0.3200 = 14.9440

Tukang 0.1000 = 4.6700

Kpl. Kelompok 0.0150 = 0.7005

0.08 0

9. Pas. atap genteng press Vol 1.5 x 8 x 2 24 m2

Kebutuhan Bahan & upah :

Genteng press 25.0000 = 600.0000

Pekerja 0.1500 = 3.6000

Tukang 0.0750 = 1.8000

Kpl. Kelompok 0.0080 = 0.1920

10. Pas. atap bubungan genteng Vol 8 m2

Kebutuhan Bahan & upah :

Genteng Bubungan 5.0000 = 40.0000

Semen Portland 8.0000 = 64.0000

Pasir pasang 0.0320 = 0.2560

Pekerja 0.4000 = 3.2000

Tukang 0.2000 = 1.6000

Kpl. Kelompok 0.0020 = 0.0160

11. Keramik dinding Vol 1.5 x 1.5 x 2 = 4.5 x 3 = 13.5 m2

Vol 2 x 1.5 x 2 = 6 x 3 = 18 m2

Kebutuhan Bahan & upah : 31.5 m2

Keramik 20 x 25 cm 20.0000 = 630.0000

Semen Portland 11.3800 = 358.4700

Pasir pasang 0.0480 = 1.5120

Semen warna 1.5000 = 47.2500

Pekerja 0.6200 = 19.5300

Tukang 0.3500 = 11.0250

Kpl. Kelompok 0.0300 = 0.9450

12. Keramik lantai Vol 1.5 x 2 x 3 9 m2

Kebutuhan Bahan & upah :

Ubin keramik 20 x 20 cm 25.0000 = 225.0000

Semen Portland 11.3800 = 102.4200

Pasir pasang 0.0420 = 0.3780

Semen warna 1.5000 = 13.5000

Pekerja 0.6200 = 5.5800

Tukang 0.3500 = 3.1500

Kpl. Kelompok 0.0300 = 0.2700

13. Plesteran Vol 2 x 3.4 x 2 = 13.6 x 2 = 27.2 m2

Vol 2 x 2.6 x 2 = 10.4 x 2 = 20.8 m2

Vol 4.5 x 2.6 x 2 - 0.6 x 2 x 3 = 19.8 x 2 = 39.6 m2

Vol 0.8 x 1.5 x 2 = 2.4 x 2 = 4.8 m2

Vol 0.5 x 2 x 0.5 x 2 = 1 x 2 = 2 m2 94.4 m2

Kebutuhan Bahan & upah :

Semen Portland 5.2000 = 490.8800

Pasir pasang 0.0200 = 1.8880

Pekerja 0.2000 = 18.8800

Tukang 0.1500 = 14.1600

Kpl. Kelompok 0.0100 = 0.9440

14. Pengecatan Vol 94.4 m2

Kebutuhan Bahan & upah :

Plamir 0.1000 = 9.4400

Cat dasar 0.1000 = 9.4400

Cat penutup 2 x 0.2600 = 24.5440

Pekerja 0.0200 = 1.8880

Tukang 0.0630 = 5.9472

Kpl. Kelompok 0.0025 = 0.2360

9,122.4281

Lihat gambar detail 1. KM / WC (2 unit)

1. Pengukuran & pmsngn bouplank Vol 8 + 6 14 m

bouwplank (keliling lahan)

Kebutuhan Bahan & upah :

Kayu 5/7 0.0120 = 0.1680

Paku biasa 2" - 5" 0.0200 = 0.2800

Kayu papan 3/20 0.0070 = 0.0980

Pekerja 0.1000 = 1.4000

Tukang 0.1000 = 1.4000

Kpl. Kelompok 0.0050 = 0.0700

0 0

2. Pembersihan lahan Vol 4 x 3 12 m2

& perataan (luas lahan)

Kebutuhan Bahan & upah :

Pekerja 0.1000 = 1.2000

Kpl. Kelompok 0.0500 = 0.6000

3. Pembuatan bak adukan Vol 1 bh

Kebutuhan Bahan & upah :

Kayu papan 3/20 0.0360 = 0.0360

Paku biasa 2" - 5" 0.0800 = 0.0800

Kayu 5/7 0.0105 = 0.0105

Tukang 0.3000 = 0.3000

4. Galian tanah Vol 1 x 1 x 3 x 2 = 6 m3

Vol 1 x 1 x 2 x 3 = 6 m3

12 m3

Kebutuhan Bahan & upah : (urugan kmbli) 3 m3

Pekerja 0.4000 = 4.8000

Kpl. Kelompok 0.0400 = 0.4800

Urugan kembali

Pekerja 0.1920 = 0.5760

Kpl. Kelompok 0.0190 = 0.0570

5. Pas. batu blonos/kali Vol 0.3 + 0.8 x 0.8 x 3 x 2 = 2.64 m3

2 0.55

Vol 0.3 + 0.8 x 0.8 x 2 x 3 = 2.64 m3

2 0.55 5.28 m3

Kebutuhan Bahan & upah :

Batu blonos/kali 1.1000 = 5.8080

Semen Portland 163.0000 = 860.6400

Pasir pasang 0.5200 = 2.7456

Pekerja 1.5000 = 7.9200

Tukang 0.6000 = 3.1680

Kpl. Kelompok 0.0750 = 0.3960

6. Urugan pasir Vol 0.1 x 1 x 14 1.4 m3

Kebutuhan Bahan & upah :

Pasir urug 1.2000 = 1.6800

Pekerja 0.3000 = 0.4200

Kpl. Kelompok 0.0100 = 0.0140

7. Cor beton sloof, kolom & ring balk 1 : 2 : Vol 0.15 x 0.15 x 3 x 4 = 0.27 m3

Vol 0.15 x 0.15 x 2 x 6 = 0.27 m3

Vol 0.15 x 0.15 x 2.6 x 6 = 0.351 m3

0.89 m3

Kebutuhan Bahan & upah :

Adukan

Semen Portland 336.0000 = 299.3760

Pasir pasang 0.5400 = 0.4811

Batu pecah 2/3 split 0.8100 = 0.7217

Pekerja 2.0000 = 1.7820

Tukang 0.3500 = 0.3118

Kpl. Kelompok 1.0000 = 0.8910

Pembesian

Besi beton 137.5000 = 122.5125

Kawat beton 2.5000 = 2.2275

Pekerja 8.4375 = 7.5178

Tukang 8.4375 = 7.5178

Begisting

Kayu tahun 0.4000 = 0.3564

Paku 4.0000 = 3.5640

Pekerja 2.0000 = 1.7820

Tukang 5.0000 = 4.4550

Kpl. Kelompok 0.1000 = 0.0891

Pemeliharaan

Pekerja 4.0000 = 3.5640

8. Pasangan bata 1 : 4 Vol 2 x 2.6 x 3 = 15.6 m2

Vol 3 x 2.6 x 2 - 0.6 x 2 x 2 = 13.2 m2

Vol 0.5 x 2 x 0.5 x 2 = 1 m2

29.8 m2

Kebutuhan Bahan & upah : 0

Bata merah 5 x 11 x 22 cm 70.0000 = 2,086.0000

Semen Portland 11.5000 = 342.7000

Pasir pasang 0.0430 = 1.2814

Pekerja 0.3200 = 9.5360

Tukang 0.1000 = 2.9800

Kpl. Kelompok 0.0150 = 0.4470

0.07 0

9. Pas. atap genteng press Vol 1.5 x 6 x 2 18 m2

Kebutuhan Bahan & upah :

Genteng press 25.0000 = 450.0000

Pekerja 0.1500 = 2.7000

Tukang 0.0750 = 1.3500

Kpl. Kelompok 0.0080 = 0.1440

10. Pas. atap bubungan genteng Vol 6 m2

Kebutuhan Bahan & upah :

Genteng Bubungan 5.0000 = 30.0000

Semen Portland 8.0000 = 48.0000

Pasir pasang 0.0320 = 0.1920

Pekerja 0.4000 = 2.4000

Tukang 0.2000 = 1.2000

Kpl. Kelompok 0.0020 = 0.0120

11. Keramik dinding Vol 1.5 x 1.5 x 2 = 4.5 x 2 = 9 m2

Vol 2 x 1.5 x 2 = 6 x 2 = 12 m2

Kebutuhan Bahan & upah : 21 m2

Keramik 20 x 25 cm 20.0000 = 420.0000

Semen Portland 11.3800 = 238.9800

Pasir pasang 0.0480 = 1.0080

Semen warna 1.5000 = 31.5000

Pekerja 0.6200 = 13.0200

Tukang 0.3500 = 7.3500

Kpl. Kelompok 0.0300 = 0.6300

12. Keramik lantai Vol 1.5 x 2 x 2 6 m2

Kebutuhan Bahan & upah :

Ubin keramik 20 x 20 cm 25.0000 = 150.0000

Semen Portland 11.3800 = 68.2800

Pasir pasang 0.0420 = 0.2520

Semen warna 1.5000 = 9.0000

Pekerja 0.6200 = 3.7200

Tukang 0.3500 = 2.1000

Kpl. Kelompok 0.0300 = 0.1800

13. Plesteran Vol 2 x 2.6 x 3 = 15.6 x 2 = 31.2 m2

Vol 3 x 2.6 x 2 - 0.6 x 2 x 3 = 12 x 2 = 24 m2

Vol 0.5 x 2 x 0.5 x 2 = 2 x 2 = 4 m2

Kebutuhan Bahan & upah : 59.2 m2

Semen Portland 5.2000 = 307.8400

Pasir pasang 0.0200 = 1.1840

Pekerja 0.2000 = 11.8400

Tukang 0.1500 = 8.8800

Kpl. Kelompok 0.0100 = 0.5920

14. Pengecatan Vol 59.2 m2

Kebutuhan Bahan & upah :

Plamir 0.1000 = 5.9200

Cat dasar 0.1000 = 5.9200

Cat penutup 2 x 0.2600 = 15.3920

Pekerja 0.0200 = 1.1840

Tukang 0.0630 = 3.7296

Kpl. Kelompok 0.0025 = 0.1480

Lihat gambar detail 1. KM / WC (1 unit)

1. Pengukuran & pmsngn bouplank Vol 4 + 3 7 m

bouwplank (keliling lahan)

Kebutuhan Bahan & upah :

Kayu 5/7 0.0120 = -

Paku biasa 2" - 5" 0.0200 = -

Kayu papan 3/20 0.0070 = -

Pekerja 0.1000 = -

Tukang 0.1000 = -

Kpl. Kelompok 0.0050 = 0.0700

0 0

2. Pembersihan lahan Vol 2 x 1.5 3 m2

& perataan (luas lahan)

Kebutuhan Bahan & upah :

Pekerja 0.1000 = -

Kpl. Kelompok 0.0500 = -

3. Pembuatan bak adukan Vol 1 bh

Kebutuhan Bahan & upah :

Kayu papan 3/20 0.0360 = -

Paku biasa 2" - 5" 0.0800 = -

Kayu 5/7 0.0105 = -

Tukang 0.3000 = -

4. Galian tanah Vol 1 x 1 x 1.5 x 2 = 3 m3

Vol 1 x 1 x 2 x 2 = 4 m3

7 m3

Kebutuhan Bahan & upah : (urugan kmbli) 1.75 m3

Pekerja 0.4000 = 0.7000

Kpl. Kelompok 0.0400 = 0.0700

Urugan kembali

Pekerja 0.1920 = -

Kpl. Kelompok 0.0190 = -

5. Pas. batu blonos/kali Vol 0.3 + 0.8 x 0.8 x 1.5 x 2 = 1.32 m3

2 0.55

Vol 0.3 + 0.8 x 0.8 x 2 x 2 = 1.76 m3

2 0.55 3.08 m3

Kebutuhan Bahan & upah :

Batu blonos/kali 1.1000 = -

Semen Portland 163.0000 = -

Pasir pasang 0.5200 = -

Pekerja 1.5000 = -

Tukang 0.6000 = -

Kpl. Kelompok 0.0750 = -

6. Urugan pasir Vol 0.1 x 1 x 7 0.7 m3

Kebutuhan Bahan & upah :

Pasir urug 1.2000 = 1.6800

Pekerja 0.3000 = 0.4200

Kpl. Kelompok 0.0100 = 0.0140

7. Cor beton sloof, kolom & ring balk 1 : 2 : Vol 0.15 x 0.15 x 1.5 x 4 = 0.135 m3

Vol 0.15 x 0.15 x 2 x 4 = 0.18 m3

Vol 0.15 x 0.15 x 2.6 x 4 = 0.234 m3

0.55 m3

Kebutuhan Bahan & upah :

Adukan

Semen Portland 336.0000 = -

Pasir pasang 0.5400 = -

Batu pecah 2/3 split 0.8100 = -

Pekerja 2.0000 = -

Tukang 0.3500 = -

Kpl. Kelompok 1.0000 = -

Pembesian

Besi beton 137.5000 = -

Kawat beton 2.5000 = -

Pekerja 8.4375 = -

Tukang 8.4375 = -

Begisting

Kayu tahun 0.4000 = -

Paku 4.0000 = -

Pekerja 2.0000 = -

Tukang 5.0000 = -

Kpl. Kelompok 0.1000 = -

Pemeliharaan

Pekerja 4.0000 = -

8. Pasangan bata 1 : 4 Vol 2 x 2.6 x 2 = 10.4 m2

Vol 1.5 x 2.6 x 2 - 0.6 x 2 x 1 = 6.6 m2

Vol 0.5 x 2 x 0.5 x 2 = 1 m2

18 m2

Kebutuhan Bahan & upah : 0

Bata merah 5 x 11 x 22 cm 70.0000 = -

Semen Portland 11.5000 = -

Pasir pasang 0.0430 = -

Pekerja 0.3200 = -

Tukang 0.1000 = -

Kpl. Kelompok 0.0150 = -

0.03 0

9. Pas. atap genteng press Vol 1.5 x 4 x 2 12 m2

Kebutuhan Bahan & upah :

Genteng press 25.0000 = -

Pekerja 0.1500 = -

Tukang 0.0750 = -

Kpl. Kelompok 0.0080 = -

10. Pas. atap bubungan genteng Vol 4 m2

Kebutuhan Bahan & upah :

Genteng Bubungan 5.0000 = -

Semen Portland 8.0000 = -

Pasir pasang 0.0320 = -

Pekerja 0.4000 = -

Tukang 0.2000 = -

Kpl. Kelompok 0.0020 = -

11. Keramik dinding Vol 1.5 x 1.5 x 2 = 4.5 x 1 = 4.5 m2

Vol 2 x 1.5 x 2 = 6 x 1 = 6 m2

Kebutuhan Bahan & upah : 10.5 m2

Keramik 20 x 25 cm 20.0000 = -

Semen Portland 11.3800 = -

Pasir pasang 0.0480 = -

Semen warna 1.5000 = -

Pekerja 0.6200 = -

Tukang 0.3500 = -

Kpl. Kelompok 0.0300 = -

12. Keramik lantai Vol 1.5 x 2 x 1 3 m2

Kebutuhan Bahan & upah :

Ubin keramik 20 x 20 cm 25.0000 = -

Semen Portland 11.3800 = -

Pasir pasang 0.0420 = -

Semen warna 1.5000 = -

Pekerja 0.6200 = -

Tukang 0.3500 = -

Kpl. Kelompok 0.0300 = -

13. Plesteran Vol 2 x 2.6 x 2 = 10.4 x 2 = 20.8 m2

Vol 1.5 x 2.6 x 4 - 0.6 x 2 x 2 = 13.2 x 1 = 13.2 m2

Vol 0.5 x 2 x 0.5 x 2 = 2 x 2 = 4 m2

Kebutuhan Bahan & upah : 38 m2

Semen Portland 5.2000 = -

Pasir pasang 0.0200 = -

Pekerja 0.2000 = -

Tukang 0.1500 = -

Kpl. Kelompok 0.0100 = -

14. Pengecatan Vol 38 m2

Kebutuhan Bahan & upah :

Plamir 0.1000 = -

Cat dasar 0.1000 = -

Cat penutup 2 x 0.2600 = -

Pekerja 0.0200 = -

Tukang 0.0630 = -

Kpl. Kelompok 0.0025 = -

Pasir pasang Pasir urug Sirtu Bata merah Batu 2/3 split

1. RESEVOAR ( 3X 2 )

1. Pengukuran & pmsngn bouplank

2. Pembersihan lahan

3. Pembuatan bak adukan

4. Pembuatan stegger

5. Galian tanah

6. Urugan pasir 0.61

7. Beton tumbuk lantai 0.26 0.44

#REF!

9. Kolom 15 x 15

10. Balok sloof 20 x 20

11. Balok 15 x 20

#REF!

#REF!

14. Beton plat atas 1.34 2.01

15. Plesteran 1 : 4 0.74

16. Pengecatan

2.35 0.61 - - - 2.45

2. KRAN UMUM

1. Galian tanah

2. Pasir urug 0.31

3. Pasangan bata 1 : 4 0.13 207.20

4. Beton tumbuk 1 : 3 : 5 0.47 0.78

5. Plesteran 1 : 4 0.09

6. Pengecatan

0.69 0.31 - 207.20 - 0.78

KM / WC (3 UNIT)

1. Pengukuran & pmsngn bouplank

2. Pembersihan lahan

3. Pembuatan bak adukan

4. Galian tanah

5. Pas. batu blonos/kali 5.26 11.13

6. Urugan pasir 2.04

7. Cor beton sloof, kolom, ring balk & 0.91 1.36

8. Pasangan bata 1 : 4 2.01 3,269.00

9. Pas. atap genteng press

10. Pas. atap bubungan genteng 0.26

11. Keramik dinding 1.51

12. Keramik lantai 0.38

13. Plesteran 1.89

14. Pengecatan

12.21 2.04 - 3,269.00 11.13 1.36

KM / WC (2 UNIT)

1. Pengukuran & pmsngn bouplank

2. Pembersihan lahan

3. Pembuatan bak adukan

Batu kali/ blonos

4. Galian tanah

5. Pas. batu blonos/kali 2.75 5.81

6. Urugan pasir 1.68

7. Cor beton sloof, kolom & ring balk 1 : 2 : 3 0.48 0.72

8. Pasangan bata 1 : 4 1.28 2,086.00

9. Pas. atap genteng press

10. Pas. atap bubungan genteng 0.19

11. Keramik dinding 1.01

12. Keramik lantai 0.25

13. Plesteran 1.18

14. Pengecatan

7.14 1.68 - 2,086.00 5.81 0.72

PC Semen warna Bambu Tali ijuk Kayu tahun Besi beton Kawat beton

0.17 0.18

0.09 0.16

27.00 6.75

110.53

833.28 0.99 9.92 341.00 6.20

193.23

1,137.04 - 27.00 6.75 1.26 10.26 341.00 6.20 -

34.04

195.49

24.60

254.13 - - - - - -

0.32 0.34

0.05 0.08

1,649.56

565.32 0.67 6.73 231.34 4.21

537.05

64.00

358.47 47.25 630.00

102.42 13.50

490.88

3,767.70 60.75 - - 1.04 7.15 231.34 4.21 630.00

0.27 0.28

0.05 0.08

Paku biasa 2"-5"

Kramik dinding

860.64

299.38 0.36 3.56 122.51 2.23

342.70

48.00

238.98 31.50 420.00

68.28 9.00

307.84

2,165.82 40.50 - - 0.67 3.92 122.51 2.23 420.00

21

Kramik lantai Plamir Cat tembok Pekerja Tukang Kep. Kelompok

0.90 0.90 0.05

0.90 0.45

0.60

0.46 6.75 0.35

2.63 0.26

0.15 0.01

0.84 0.13 0.04

40.77 34.19 2.73

7.43 5.57 0.37

3.72 13.38 0.74 2.34 0.09

- 3.72 13.38 54.82 50.48 4.35

0.15 0.01

0.08 0.00

0.95 0.30 0.04

1.48 0.22 0.07

0.95 0.71 0.05

0.47 1.70 0.09 0.30 0.01

0.47 1.70 3.69 1.53 0.19

1.70 1.70 0.09

1.65 0.83

0.30

10.30 1.03

15.18 6.07 0.76

0.51 0.02

27.66 23.20 1.85

14.94 4.67 0.70

600.00 3.60 1.80 0.19

40.00 3.20 1.60 0.02

19.53 11.02 0.95

225.00 5.58 3.15 0.27

18.88 14.16 0.94

9.44 33.98 1.89 5.95 0.24

225.00 9.44 33.98 124.62 73.62 7.87

1.40 1.40 0.07

1.20 0.60

0.30

Genteng press

Genteng bubungan

5.38 0.54

7.92 3.17 0.40

0.42 0.01

14.65 12.28 0.98

9.54 2.98 0.45

450.00 2.70 1.35 0.95

30.00 2.40 1.20 0.01

13.02 7.35 0.63

150.00 3.72 2.10 0.18

11.84 8.88 0.59

5.92 21.31 1.18 3.73 0.15

150.00 5.92 21.31 75.36 44.74 5.55

6

RENCANA ANGGARAN BIAYA (RAB) HIK PAMSIMAS

Desa : Sumber AgungKecamatan : Klego Nomor RAB : 1Kabupaten : Boyolali Pekerjaan/kegiatan : Biaya Operasional LKM dan Provinsi : Jawa Tengah BP SPAMs Pamsimas

UraianVolume Harga Satuan Biaya (Rp)

TotalKontribusi Masyarakat (APBD / Satuan Rp

TotalKontribusi Masyarakat

inCash inKind APBN) * inCash inKind1 2 3 4 5 6 7 8=9+10+11 9=3x7 10=4x7 11=5x7

A. BAHAN

Perlengkapan ATK- Pensil 2B 3 3 buah 3,000 9,000 9,000 - - - Penghapus karet 2 2 buah 2,000 4,000 4,000 - - - Ballpoint 7 7 buah 2,000 14,000 14,000 - - - Drawing pen 2 2 buah 8,000 16,000 16,000 - - - Spidol besar 5 5 buah 7,000 35,000 35,000 - - - Spidol kecil 2 2 pak 12,000 24,000 24,000 - - - Tip-ex fluid sedang 2 2 buah 3,000 6,000 6,000 - - - Buku tulis tebal 10 10 buah 3,000 30,000 30,000 - - - Buku kas folio bergaris 2 2 buah 20,000 40,000 40,000 - - - Kwitansi besar 1 1 buah 3,000 3,000 3,000 - - - Stopmap biasa folio 14 14 buah 500 7,000 7,000 - - - Stopmap plastik 10 10 buah 2,500 25,000 25,000 - - - Snelhekter plastik 10 10 buah 6,000 60,000 60,000 - - - Kertas manila 10 10 lembar 1,500 15,000 15,000 - - - Kertas HVS A4 80 gram 2 2 rim 37,000 74,000 74,000 - - - Kertas HVS A4 70 gram 2 2 rim 35,000 70,000 70,000 - - - Tinta printer hitam 2 2 botol 37,000 74,000 74,000 - - - Tinta printer warna 3 3 botol 37,000 111,000 111,000 - - - Steples kecil 1 1 buah 8,500 8,500 8,500 - - - Steples sedang 1 1 buah 14,000 14,000 14,000 - - - Isi steples kecil 1 1 dus 1,500 1,500 1,500 - - - Isi steples sedang 1 1 dus 2,500 2,500 2,500 - - - Pisau cutter besar 1 1 buah 10,000 10,000 10,000 - - - Isi pisau cutter besar 1 1 pak 3,500 3,500 3,500 - - - Lakban hitam 1 1 rol 8,500 8,500 8,500 - -

Lakban Kertas 1 1 rol 6,000 6,000 6,000 - -

(APBD /APBN) *

- Flashdisk 8 GB 1 1 buah 90,000 90,000 90,000 - - - Gunting 1 1 buah 8,000 8,000 8,000 - - - Perforator kecil 1 1 buah 8,000 8,000 8,000 - - - Materai 6000 11 11 lembar 6,500 71,500 71,500 - - - Banner program 2 2 m 30,000 60,000 60,000 - - - Banner sekretariat LKM 1 1 m 30,000 30,000 30,000 - - - Banner struktur LKM 1 1 m 30,000 30,000 30,000 - - - Foto copy dan jilid laminating RKM dan 7 7 jilid 100,000 700,000 700,000 - - - Cetak foto 100 100 lembar 2,000 200,000 200,000 - - - Papan informasi 1 1 buah 130,000 130,000 130,000 - -

Kalkulator 1 1 buah 75,000 75,000 75,000 Batu Alkalin 4 4 bh 7,500 30,000 30,000 Isolasi doble tape 1 1 bh 6,000 6,000 6,000

Sub Total 1) 2,110,000 2,110,000 - -

Biaya Pertemuan

- 4 keg 30 orang 10,000 1,200,000 1,200,000 - -

- LKM dan BP SPAMs Pamsimas (snack) 5 keg 25 orang 10,000 1,250,000 1,250,000 - - Perjalanan Dinas

- Ke Kecamatan- Pembina 2 keg 1 orang 20,000 40,000 40,000 - - - Koordinator LKM 2 keg 1 orang 20,000 40,000 40,000 - - - BP Spams 2 keg 1 orang 20,000 40,000 40,000 - -

- Ke KabupatenDinas Pekerjaan Umum/ DPMU- Pembina 4 keg 2 orang 40,000 320,000 320,000 - - - Koordinator LKM 4 keg 2 orang 40,000 320,000 320,000 - - - Ketua BP SPAMs Pamsimas 4 keg 2 orang 40,000 320,000 320,000 - - - Unit Teknik 4 keg 2 orang 40,000 320,000 320,000 - -

- Bappeda- Pembina 2 keg 1 orang 40,000 80,000 80,000 - - - Koordinator LKM 2 keg 1 orang 40,000 80,000 80,000 - -

- Ketua BP SPAMs Pamsimas 2 keg 1 orang 40,000 80,000 80,000 - - - Bank

- Koordinator LKM 4 keg 1 orang 25,000 100,000 100,000 - -

- Ketua BP SPAMs Pamsimas 4 keg 1 orang 25,000 100,000 100,000 - -

- Bendahara 4 keg 1 orang 25,000 100,000 100,000 - -

B. ALAT

Pemilihan Opsi & PJM ProAKSI dan RKM (snack)

Sub Total 2) 4,390,000 4,390,000 - -

- - - - - - - - - - - -

Sub Total 3) - - - -

Jumlah Total 6,500,000 6,500,000 - -

Sumber Agung, September 2013

Disetujui oleh : Dibuat oleh :Koordinator LKM SATLAK

( Sunyono ) ( Gunadi )

Ketua DPMU Fasilitator HIK

(Martono, ST. ) ( Zufron Asrofi Tunggul N, S.Sos )NIP. 19630605 199309 1 001

C. UPAH

RENCANA PENGGUNAAN DANA ( RPD )

Desa : Sumber AgungKecamatan : KlegoKabupaten : Boyolali BOPProvinsi : Jawa Tengah

UraianVolume Harga Satuan Biaya (Rp)

Kebutuhan Real s/d Pengajuan Jumlah Satuan JumlahLalu Sekarang Komulatif

1 2 3 4 5 6 7 8=9+10+11

A. BAHAN

Perlengkapan ATK- Pensil 2B 3 3 3 buah 3,000 9,000 - Penghapus karet 2 2 2 buah 2,000 4,000 - Ballpoint 7 7 7 buah 2,000 14,000 - Drawing pen 2 2 2 buah 8,000 16,000 - Spidol besar 5 5 5 buah 7,000 35,000 - Spidol kecil 2 2 2 pak 12,000 24,000 - Tip-ex fluid sedang 2 2 2 buah 3,000 6,000 - Buku tulis tebal 10 10 10 buah 3,000 30,000 - Buku kas folio bergaris 2 2 2 buah 20,000 40,000 - Kwitansi besar 1 1 1 buah 3,000 3,000 - Stopmap biasa folio 14 13 13 buah 500 6,500 - Stopmap plastik 10 8 8 buah 2,500 20,000 - Snelhekter plastik 10 10 10 buah 6,000 60,000 - Kertas manila 10 10 10 lembar 1,500 15,000 - Kertas HVS A4 80 gram 2 2 2 rim 37,000 74,000 - Kertas HVS A4 70 gram 2 1 1 rim 35,000 35,000 - Tinta printer hitam 2 1 1 botol 37,000 37,000 - Tinta printer warna 3 3 3 botol 37,000 111,000 - Steples kecil 1 1 1 buah 8,500 8,500 - Steples sedang 1 1 1 buah 14,000 14,000 - Isi steples kecil 1 1 1 dus 1,500 1,500 - Isi steples sedang 1 1 1 dus 2,500 2,500 - Pisau cutter besar 1 1 1 buah 10,000 10,000 - Isi pisau cutter besar 1 1 1 pak 3,500 3,500 - Lakban hitam 1 1 1 rol 8,500 8,500

Lakban Kertas 1 1 1 rol 6,000 6,000 - Flashdisk 8 GB 1 buah 90,000 - - Gunting 1 1 1 buah 8,000 8,000 - Perforator kecil 1 1 1 buah 8,000 8,000 - Materai 6000 11 9 9 lembar 6,500 58,500 - Banner program 2 2 2 m 30,000 60,000 - Banner sekretariat LKM 1 1 1 m 30,000 30,000 - Banner struktur LKM 1 1 1 m 30,000 30,000 - Foto copy dan jilid laminating RKM dan 7 7 7 jilid 100,000 700,000 - Cetak foto 100 100 100 lembar 2,000 200,000 - Papan informasi 1 1 1 buah 130,000 130,000

Kalkulator 1 buah 75,000 - Batu Alkalin 4 4 4 bh 7,500 30,000 Isolasi doble tape 1 1 1 bh 6,000 6,000

Sub Total 1) 1,854,500

Biaya Pertemuan

- 1 1 1 orang 300,000 300,000

- LKM dan BP SPAMs Pamsimas (snack) 2 2 2 orang 250,000 500,000 Perjalanan Dinas

- Ke Kecamatan- Pembina 2 1 1 orang 20,000 20,000 - Koordinator LKM 2 1 1 orang 20,000 20,000 - BP Spams 2 1 1 orang 20,000 20,000

- Ke Kabupaten - Dinas Pekerjaan Umum/ DPMU - - Pembina 4 1 1 orang 40,000 40,000 - Koordinator LKM 4 2 2 orang 40,000 80,000 - Ketua BP SPAMs Pamsimas 4 2 2 orang 40,000 80,000 - Unit Teknik 4 orang 40,000 -

- Bappeda - - Pembina 2 orang 40,000 - - Koordinator LKM 2 2 2 orang 40,000 80,000 - Ketua BP SPAMs Pamsimas 2 orang 40,000 -

- Bank - - Koordinator LKM 4 2 2 orang 25,000 50,000 - Ketua BP SPAMs Pamsimas 4 orang 25,000 - - Bendahara 4 2 2 orang 25,000 50,000

Sub Total 2) 1,240,000 Jumlah Pengajuan Dana 3,094,500

Tiga Juta Sembilan pulu empat ribu lima ratus rupiah

B. ALAT

Pemilihan Opsi & PJM ProAKSI dan RKM (snack)

RENCANA ANGGARAN BIAYA (RAB) HIK PAMSIMAS

Desa : Sumber Agung Nomor RAB : 3Kecamatan : Klego Pekerjaan/kegiatan : Pelatihan Kelembagaan Kabupaten : Boyolali Ukuran : - Provinsi : Jawa Tengah Jumlah : 1 hari

UraianVolume Harga Satuan Biaya (Rp)

TotalKontribusi Masyarakat Satuan Rp

TotalKontribusi Masyarakat

inCash inKind inCash inKind1 2 3 4 5 6 7 8=9+10+11 9=3x7 10=4x7 11=5x7

A. BAHAN ATK PESERTA

1 Modul 5 buah 20,000 100,000 100,000 - -

2 Notes book 5 buah 4,500 22,500 22,500 - -

3 Bollpoint 5 buah 2,000 10,000 10,000 - -

4 Pensil 2B 5 buah 3,000 15,000 15,000 - -

5 Penghapus karet 5 buah 2,000 10,000 10,000 - -

6 Garisan mika 5 buah 3,000 15,000 15,000 - -

7 Amplop plastik besar 5 buah 3,000 15,000 15,000 - -

KEBUTUHAN PELATIHAN 1 Kertas HVS 70 gram 2 rim 35,000 70,000 70,000 - -

2 Kertas plano 14 lembar 500 7,000 7,000 - -

3 Plakban hitam 2 rol 8,500 17,000 17,000 - -

4 Steples kecil 2 buah 8,500 17,000 17,000 - -

5 Isi steples kecil 1 dus 1,500 1,500 1,500 - -

6 Foto copy format-format 50 lembar 200 10,000 10,000 - -

Sub Total 1) 310,000 310,000 - -

(APBD / (APBD /APBN) * APBN) *

1 Konsumsia. Snack (2 kali) 5 orang 10,000 50,000 50,000 - -

b. Makan (1 kali) 5 orang 10,000 50,000 50,000 - -

2 Transport peserta 5 orang 20,000 100,000 100,000 - -

3 Sewa LCD proyektor 1 hari 100,000 100,000 100,000 - -

4 Sewa sound sistem 1 hari 100,000 100,000 100,000 - -

5 Banner spanduk pelatihan 1 m 30,000 30,000 30,000 - -

Sub Total 2) 430,000 430,000 - -

- - - - - - - - - - - -

Sub Total 3) - - - -

Jumlah Total 740,000 740,000 - -

Sumber Agung , September 2013Disetujui oleh : Dibuat oleh :

Koordinator LKM SATLAK

( Sunyono ) ( Gunadi )

Ketua DPMU Fasilitator HIK

(Martono, ST. ) ( Zufron Asrofi Tunggul N, S.Sos )NIP. 19630605 199309 1 001

B. ALAT

C. UPAH

RENCANA ANGGARAN BIAYA (RAB) HIK PAMSIMAS

Desa : Sumber Agung Nomor RAB : 2Kecamatan : Klego Pekerjaan/kegiatan : Pelatihan Pengelolaan Administrasi & Keuangan Kabupaten : Boyolali Ukuran : - Provinsi : Jawa Tengah Jumlah : 1 hari

UraianVolume Harga Satuan Biaya (Rp)

TotalKontribusi Masyarakat Satuan Rp

TotalKontribusi Masyarakat

inCash inKind inCash inKind1 2 3 4 5 6 7 8=9+10+11 9=3x7 10=4x7 11=5x7

A. BAHAN ATK PESERTA

1 Modul 10 buah 20,000 200,000 200,000 - -

2 Notes book 10 buah 4,500 45,000 45,000 - -

3 Bollpoint 10 buah 2,000 20,000 20,000 - -

4 Pensil 2B 10 buah 3,000 30,000 30,000 - -

5 Penghapus karet 10 buah 2,000 20,000 20,000 - -

6 Garisan mika 10 buah 3,000 30,000 30,000 - -

7 Amplop plastik besar 10 buah 3,000 30,000 30,000 - -

KEBUTUHAN PELATIHAN 1 Kalkulator 12 digit besar 2 buah 80,000 160,000 160,000 - -

2 Kertas HVS 70 gram 2 rim 35,000 70,000 70,000 - -

3 Kertas plano 21 lembar 500 10,500 10,500 - -

4 Plakban hitam 2 rol 8,500 17,000 17,000 - -

5 Steples kecil 1 buah 8,500 8,500 8,500 - -

6 Isi steples kecil 1 dus 1,500 1,500 1,500 - -

7 Foto copy A3 25 lembar 300 7,500 7,500 - -

8 Foto copy format-format 300 lembar 200 60,000 60,000 - -

Sub Total 1) 710,000 710,000 - -

(APBD / (APBD /APBN) * APBN) *

1 Konsumsia. Snack (2 kali) 10 orang 10,000 100,000 100,000 - -

b. Makan (1 kali) 10 orang 10,000 100,000 100,000 - -

2 Transport peserta 10 orang 20,000 200,000 200,000 - -

3 Sewa LCD proyektor 1 hari 100,000 100,000 100,000 - -

4 Sewa sound sistem 1 hari 100,000 100,000 100,000 - -

5 Banner spanduk pelatihan 1 m 30,000 30,000 30,000 - -

Sub Total 2) 630,000 630,000 - -

- - - - - - - - - - - -

Sub Total 3) - - - -

Jumlah Total 1,340,000 1,340,000 - -

Sumber Agung , September 2013Disetujui oleh : Dibuat oleh :

Koordinator LKM SATLAK

( Sunyono ) ( Gunadi )

Ketua DPMU Fasilitator HIK

(Martono, ST. ) ( Zufron Asrofi Tunggul N, S.Sos )NIP. 19630605 199309 1 001

B. ALAT

C. UPAH

RENCANA PENGGUNAAN DANA ( RPD )

Desa : Sumber Agung RPD : 1Kecamatan : Klego Pekerjaan/kegiatan : Pelatihan Pengelolaan Administrasi & Keuangan Kabupaten : Boyolali Ukuran : - Provinsi : Jawa Tengah Jumlah : 1 hari

UraianVolume Harga Satuan Biaya (Rp)

Kebutuhan Real s/d Pengajuan Jumlah Satuan Jumlahlalu Sekarang Komulatif

1 2 3 4 5 6 7 8=9+10+11

A. BAHAN ATK PESERTA

1 Modul 10 10 10 buah 20,000 200,000 2 Notes book 10 10 10 buah 4,500 45,000 3 Bollpoint 10 10 10 buah 2,000 20,000 4 Pensil 2B 10 10 10 buah 3,000 30,000 5 Penghapus karet 10 10 10 buah 2,000 20,000 6 Garisan mika 10 10 10 buah 3,000 30,000 7 Amplop plastik besar 10 10 10 buah 3,000 30,000

KEBUTUHAN PELATIHAN - 1 Kalkulator 12 digit besar 2 2 2 buah 80,000 160,000 2 Kertas HVS 70 gram 2 2 2 rim 35,000 70,000 3 Kertas plano 21 21 21 lembar 500 10,500 4 Plakban hitam 2 2 2 rol 8,500 17,000 5 Steples kecil 1 1 1 buah 8,500 8,500 6 Isi steples kecil 1 1 1 dus 1,500 1,500 7 Foto copy A3 25 25 25 lembar 300 7,500 8 Foto copy format-format 300 300 300 lembar 200 60,000

Sub Total 1) 710,000

1 Konsumsia. Snack (2 kali) 10 10 orang 10,000 100,000 b. Makan (1 kali) 10 10 orang 10,000 100,000

2 Transport peserta 10 10 orang 20,000 200,000 3 Sewa LCD proyektor 1 1 hari 100,000 100,000 4 Sewa sound sistem 1 1 hari 100,000 100,000 5 Banner spanduk pelatihan 1 1 m 30,000 30,000

Sub Total 2) 630,000 Jumlah Pengajuan Dana 1,340,000

Satu Juta Tiga Ratus Empat Puluh Ribu Rupiah

B. ALAT

RENCANA PENGGUNAAN DANA ( RPD )

Desa : Sumber Agung RPD : 1Kecamatan : Klego Pekerjaan/kegiatan : Pelatihan Kelembagaan Kabupaten : Boyolali Ukuran : - Provinsi : Jawa Tengah Jumlah : 1 hari

UraianVolume Harga Satuan Biaya (Rp)

Keutuhan Real s/d Pengajuan Jumlah Satuan JumlahLalu Sekarang Komulatif

1 2 3 4 5 6 7 8=9+10+11

A. BAHAN ATK PESERTA

1 Modul 5 5 5 buah 20,000 100,000 2 Notes book 5 5 5 buah 4,500 22,500 3 Bollpoint 5 5 5 buah 2,000 10,000 4 Pensil 2B 5 5 5 buah 3,000 15,000 5 Penghapus karet 5 5 5 buah 2,000 10,000 6 Garisan mika 5 5 5 buah 3,000 15,000 7 Amplop plastik besar 5 5 5 buah 3,000 15,000

KEBUTUHAN PELATIHAN - 1 Kertas HVS 70 gram 2 2 2 rim 35,000 70,000 2 Kertas plano 14 14 14 lembar 500 7,000 3 Plakban hitam 2 2 2 rol 8,500 17,000 4 Steples kecil 2 2 2 buah 8,500 17,000 5 Isi steples kecil 1 1 1 dus 1,500 1,500 6 Foto copy format-format 50 50 50 lembar 200 10,000

Sub Total 1) 310,000

1 Konsumsia. Snack (2 kali) 5 5 5 orang 10,000 50,000 b. Makan (1 kali) 5 5 5 orang 10,000 50,000

2 Transport peserta 5 5 5 orang 20,000 100,000 3 Sewa LCD proyektor 1 1 1 hari 100,000 100,000 4 Sewa sound sistem 1 1 1 hari 100,000 100,000 5 Banner spanduk pelatihan 1 1 1 m 30,000 30,000

Sub Total 2) 430,000 Jumlah dana yang diajukan 740,000

Tujuh Ratus Empat Puluh Ribu Rupiah

B. ALAT

RENCANA ANGGARAN BIAYA (RAB) HIK PAMSIMAS

Desa : Sumber Agung Nomor RAB : 4Kecamatan : Klego Pekerjaan/kegiatan : Pelatihan Teknis SAM Kabupaten : Boyolali Ukuran : - Provinsi : Jawa Tengah Jumlah : 1 hari

UraianVolume Harga Satuan Biaya (Rp)

TotalKontribusi Masyarakat Satuan Rp

TotalKontribusi Masyarakat

inCash inKind inCash inKind1 2 3 4 5 6 7 8=9+10+11 9=3x7 10=4x7 11=5x7

A. BAHAN ATK PESERTA

1 Modul 5 buah 20,000 100,000 100,000 - -

2 Notes book 5 buah 4,500 22,500 22,500 - -

3 Bollpoint 5 buah 2,000 10,000 10,000 - -

4 Pensil 2B 5 buah 3,000 15,000 15,000 - -

5 Penghapus karet 5 buah 2,000 10,000 10,000 - -

6 Garisan mika 5 buah 3,000 15,000 15,000 - -

7 Amplop plastik besar 5 buah 3,000 15,000 15,000 - -

KEBUTUHAN PELATIHAN 1 Kertas HVS 70 gram 1 rim 35,000 35,000 35,000 - -

2 Kertas plano 20 lembar 500 10,000 10,000 - -

3 Lakban hitam 1 rol 8,500 8,500 8,500 - -

4 Steples kecil 1 buah 8,500 8,500 8,500 - -

5 Isi steples kecil 1 dus 1,500 1,500 1,500 - -

6 Foto copy gambar-gambar teknik 100 lembar 200 20,000 20,000 - -

7 Pipa PVC Wavin 3/4 1 btg 22,000 22,000 22,000 - -

8 Lem 1 bh 9,500 9,500 9,500 - -

9 Amplas 1 bh 3,000 3,000 3,000 - -

10 Sambungan TEE 3 bh 2,000 6,000 6,000 - -

11 Kenni 2" 3 bh 2,000 6,000 6,000 - -

12 OverSock 3 bh 2,500 7,500 7,500 - -

13 Semen 1 kg 43,000 43,000 43,000 - - 14 Bendrat 1 kg 20,000 20,000 20,000 - -

Sub Total 1) 388,000 388,000 - -

(APBD / (APBD /APBN) * APBN) *

1 Konsumsia. Snack (2 kali) 5 orang 10,000 50,000 50,000 - -

b. Makan (1 kali) 5 orang 10,000 50,000 50,000 - -

2 Transport peserta 5 orang 20,000 100,000 100,000 - -

3 Sewa LCD proyektor 1 hari 100,000 100,000 100,000 - -

4 Sewa sound sistem 1 hari 100,000 100,000 100,000 - -

6 Banner spanduk pelatihan 1 m 30,000 30,000 30,000 - -

Sub Total 2) 430,000 430,000 - -

- - - - - - - - - - - -

Sub Total 3) - - - -

Jumlah Total 818,000 818,000 - -

Sumber Agung , September 2013Disetujui oleh : Dibuat oleh :

Koordinator LKM SATLAK

( Sunyono ) ( Gunadi )

Ketua DPMU Fasilitator HIK

(Martono, ST. ) ( Zufron Asrofi Tunggul N, S.Sos )NIP. 19630605 199309 1 001

B. ALAT

C. UPAH

RENCANA PENGGUNAAN DANA ( RPD )

Desa : Sumber AgungKecamatan : KlegoKabupaten : BoyolaliProvinsi : Jawa Tengah

UraianVolume Harga Satuan Biaya (Rp)

Kebutuhan Real s/d pengajuan Jumlah Satuan Jumlahlalu Sekarang Komulatif

1 2 3 4 5 6 7 8=9+10+11

A. BAHAN ATK PESERTA

1 Modul 5 5 5 buah 20,000 100,000 2 Notes book 5 5 5 buah 4,500 22,500 3 Bollpoint 5 5 5 buah 2,000 10,000 4 Pensil 2B 5 5 5 buah 3,000 15,000 5 Penghapus karet 5 5 5 buah 2,000 10,000 6 Garisan mika 5 5 5 buah 3,000 15,000 7 Amplop plastik besar 5 5 5 buah 3,000 15,000

KEBUTUHAN PELATIHAN - 1 Kertas HVS 70 gram 1 1 1 rim 35,000 35,000 2 Kertas plano 20 20 20 lembar 500 10,000 3 Lakban hitam 1 1 1 rol 8,500 8,500 4 Steples kecil 1 1 1 buah 8,500 8,500 5 Isi steples kecil 1 1 1 dus 1,500 1,500 6 Foto copy gambar-gambar teknik 100 100 100 lembar 200 20,000 7 Pipa PVC Wavin 3/4 1 1 1 btg 22,000 22,000 8 Lem 1 1 1 bh 9,500 9,500 9 Amplas 1 1 1 bh 3,000 3,000

10 Sambungan TEE 3 3 3 bh 2,000 6,000 11 Kenni 2" 3 3 3 bh 2,000 6,000 12 OverSock 3 3 3 bh 2,500 7,500 13 Semen 1 1 1 kg 43,000 43,000 14 Bendrat 1 1 1 kg 20,000 20,000

Sub Total 1) 388,000

1 Konsumsia. Snack (2 kali) 5 5 5 orang 10,000 50,000 b. Makan (1 kali) 5 5 5 orang 10,000 50,000

2 Transport peserta 5 5 5 orang 20,000 100,000 3 Sewa LCD proyektor 1 1 1 hari 100,000 100,000 4 Sewa sound sistem 1 1 1 hari 100,000 100,000 6 Banner spanduk pelatihan 1 1 1 m 30,000 30,000

Sub Total 1) 430,000

Total Pengajuan Dana 818,000

B. ALAT

RENCANA ANGGARAN BIAYA (RAB) HIK PAMSIMAS

Desa : Sumber Agung Nomor RAB : 5Kecamatan : Klego Pekerjaan/kegiatan : Sumur Bor Dalam Kabupaten : Boyolali Ukuran : Kedalam 100 m Provinsi : Jawa Tengah Jumlah : 1 unit

UraianVolume Harga Satuan Biaya (Rp)

TotalKontribusi Masyarakat Satuan Rp

TotalKontribusi Masyarakat

inCash inKind inCash inKind1 2 3 4 5 6 7 8=9+10+11 9=3x7 10=4x7 11=5x7

I PEMBUATAN SUMUR DALAM 100 M' A PEKERJAAN PENGADAAN KONSTRUKSI SUMUR DALAM 1 a. Geolistrik 1 1 unit 2,500,000 2,500,000 - - 2,500,000

b. Mobilisasi dan demobilisasi rig dan peralatan ke lokasi pekerjaan 1 1 ls 600,000 600,000 - - 600,000 c Persiapan dan Pembersihan lokasi dan pembuatan Bak lumpur 1 1 ls 600,000 600,000 - - 600,000

2 Pengeboran Sumura. Pembuatan lubang bor diameter 4"

- 00 m - 40 m 40 40 m' 176,500 7,060,000 - - 7,060,000 - 40 m - 80 m 40 40 m' 204,570 8,182,800 - - 8,182,800 - 80 m - 100 m 20 20 m' 257,410 5,148,200 - - 5,148,200

b. Pembuatan lubang bor diameter 8"- 00 m - 40 m 40 40 m' 134,950 5,398,000 - - 5,398,000 - 40 m - 80 m 40 40 m' 152,440 6,097,600 - - 6,097,600 - 80 m - 100 m 20 20 m' 179,000 3,580,000 - - 3,580,000

3 Pengadaan dan pemasangan Konstruksi Sumura. Pengadaan pipa PVC tipe AW diameter 5" menerus 82 82 m' 52,000 4,264,000 - - 4,264,000 b. Pengadaan screen PVC tipe AW Diameter 5" 18 18 m' 77,000 1,386,000 - - 1,386,000 c. Pekerjaan konstruksi/pemasangan pipa PVC dan screen PVC 100 100 m' 43,663 4,366,300 - - 4,366,300 d. Pekerjaan Gravel Pack diluar pipa PVC dan screen PVC 2 mm - 10 mm 1 1 m3 186,250 186,250 - - 186,250 e. Pekerjaan semen grouting 0.5 0.5 m3 706,105 353,053 - - 353,053 f. Cor beton 1:3:5 0.5 0.5 m3 502,250 251,125 - - 251,125

Subtotal A 49,973,328 - - 49,973,328 B PEKERJAAN AFWERKING SUMUR

- Pekerjaan pengurasan 1 1 Ls 865,000 865,000 - - 865,000 - Pekerjaan pumping test 48 48 jam 75,540 3,625,896 - - 3,625,896

Longging Test 1 Ls 2,500,000 2,500,000 - - 2,500,000 - Pemeriksaan air hasil pengeboran dilaboratorium 2 2 kali 320,000 640,000 - - 640,000

Subtotal B 7,630,896 - - 7,630,896 C PEKERJAAN FINISHING - - - -

Pembuatan Bak pelindung sumur dan asesoris 1 1 unit 350,000 350,000 - - 350,000 - Pembuatan laporan akhir 1 1 Ls 250,000 250,000 - - 250,000

Subtotal C 600,000 - - 600,000 JUMLAH I (A + B + C) 58,204,224 - - 58,204,224

(APBD / (APBD /APBN) * APBN) *

II PENGADAAN DAN PEMASANGAN POMPA BERIKUT KELENGKAPANNYA1 Pompa submersible stainless steel diameter 1 1/2" SP 5A-17

kapasitas 5 m3/jam 2 kW 1 phase x 220 V, H = 80 m setara Grundfos 1 unit 15,190,000 15,190,000 - - 15,190,000 2 Panel pompa 1 phase 1,5 kW, 2 WLC 1 unit 2,500,000 2,500,000 - - 2,500,000 3 Stabilizer voltage (stavolt 3500 VA 1 Phase) 1 bh 3,000,000 3,000,000 3,000,000 - - 4 Kabel pompa NYYHY 3 x 2,5 mm 100 m' 24,000 2,400,000 - - 2,400,000 5 Kabel elektroda NYYHY 3 x 1,5 mm 100 m' 10,000 1,000,000 - - 1,000,000 6 Isolasi 3 m 2 bh 36,000 72,000 - - 72,000 7 Elektroda massa 2 bh 30,000 60,000 - - 60,000 8 Pipa pompa GI kelas medium A DN 1 1/2" 15 m' 65,000 975,000 - - 975,000 9 Shock GI DN 1 1/2" 6 bh 14,000 84,000 - - 84,000

10 Well cover DN 5" x 1 1/2" 1 bh 100,000 100,000 - - 100,000 11 Pipa Pengaman Pipa Inlet GI DN 5" Medium B 1 m' 75,000 75,000 - - 75,000 12 Knee GI DN 1 1/2" 45' 2 bh 16,000 32,000 - - 32,000 13 Knee GI DN 1 1/2" 90' 2 bh 20,000 40,000 - - 40,000 14 Double nipple GI DN 1 1/2" 3 bh 16,000 48,000 - - 48,000 15 Stop kran DN 1 1/2" 1 bh 160,000 160,000 - - 160,000 16 Watermoor GI DN 1 1/2" 1 bh 40,000 40,000 - - 40,000 17 Check valve DN 1 1/2" 1 bh 400,000 400,000 - - 400,000 18 TBA / sealtape 14 bh 3,500 49,000 - - 49,000 19 Pemasangan Pompa lengkap dengan aksesoris 1 unit 550,000 550,000 550,000 - - 20 Murbaut 16 bh 2,800 44,800 44,800 - -

JUMLAH II 26,819,800 3,594,800 - 23,225,000

Jumlah Total (I+II) 85,024,024 3,594,800 - 81,429,224

Dibulatkan 85,024,000 3,594,000 - 81,429,000

Sumber Agung , September 2013

Disetujui oleh : Dibuat oleh :Koordinator LKM SATLAK

( Sunyono ) ( Gunadi )

Ketua DPMU Fasilitator HIK

(Martono, ST. ) Tri Martanti,ST NIP. 19630605 199309 1 001

RENCANA PENGGUNAAN DANA ( RPD )

Desa : Sumber AgungKecamatan : KlegoKabupaten : BoyolaliProvinsi : Jawa Tengah

UraianVolume Harga Satuan Biaya (Rp)

Kebutuhan Real s/d Pengajuan Jumlah Satuan JumlahLalu Sekarang Komulatif

1 2 3 4 5 6 7 8=9+10+11

I PEMBUATAN SUMUR DALAM 100 M' A PEKERJAAN PENGADAAN KONSTRUKSI SUMUR DALAM 1 a. Geolistrik 1 1 1 unit 2,500,000 2,500,000

b. Mobilisasi dan demobilisasi rig dan peralatan ke lokasi pe 1 1 1 ls 600,000 600,000 c Persiapan dan Pembersihan lokasi dan pembuatan Bak l 1 1 1 ls 600,000 600,000

2 Pengeboran Sumur - a. Pembuatan lubang bor diameter 4" -

- 00 m - 40 m 40 40 40 m' 176,500 7,060,000 - 40 m - 80 m 40 40 40 m' 204,570 8,182,800 - 80 m - 100 m 40 20 20 m' 257,410 5,148,200

b. Pembuatan lubang bor diameter 8" - - 00 m - 40 m 40 40 40 m' 134,950 5,398,000 - 40 m - 80 m 40 40 40 m' 152,440 6,097,600 - 80 m - 100 m 20 20 20 m' 179,000 3,580,000

3 Pengadaan dan pemasangan Konstruksi Sumur - a. Pengadaan pipa PVC tipe AW diameter 5" menerus 82 82 82 m' 52,000 4,264,000 b. Pengadaan screen PVC tipe AW Diameter 5" 18 18 18 m' 77,000 1,386,000 c. Pekerjaan konstruksi/pemasangan pipa PVC dan screen 100 100 100 m' 43,663 4,366,300 d. Pekerjaan Gravel Pack diluar pipa PVC dan screen PVC 1 1 1 m3 186,250 186,250 e. Pekerjaan semen grouting 0.5 0.5 0.5 m3 706,105 353,053 f. Cor beton 1:3:5 0.5 0.5 0.5 m3 502,250 251,125

Subtotal A 49,973,328 B PEKERJAAN AFWERKING SUMUR

- Pekerjaan pengurasan 1 Ls 865,000 - - Pekerjaan pumping test 48 jam 75,540 -

Longging Test 1 Ls 2,500,000 - - Pemeriksaan air hasil pengeboran dilaboratorium 2 kali 320,000 -

Subtotal B - C PEKERJAAN FINISHING

Pembuatan Bak pelindung sumur dan asesoris 1 unit 350,000 - Pembuatan laporan akhir 1 Ls 250,000

Subtotal C - JUMLAH I (A + B + C) 49,973,328

II PENGADAAN DAN PEMASANGAN POMPA BERIKUT KELENGKAPANNYA1 Pompa submersible stainless steel diameter 1 1/2" SP 5A-17

kapasitas 5 m3/jam 2 kW 1 phase x 220 V, H = 80 m setara 1 unit 15,190,000 - 2 Panel pompa 1 phase 1,5 kW, 2 WLC 1 unit 2,500,000 - 3 Stabilizer voltage (stavolt 3500 VA 1 Phase) 1 bh 3,000,000 - 4 Kabel pompa NYYHY 3 x 2,5 mm 100 m' 24,000 - 5 Kabel elektroda NYYHY 3 x 1,5 mm 100 m' 10,000 - 6 Isolasi 3 m 2 bh 36,000 - 7 Elektroda massa 2 bh 30,000 - 8 Pipa pompa GI kelas medium A DN 1 1/2" 25 m' 65,000 - 9 Shock GI DN 1 1/2" 6 bh 14,000 -

10 Well cover DN 5" x 1 1/2" 1 bh 100,000 - 11 Pipa Pengaman Pipa Inlet GI DN 5" Medium B 1 m' 75,000 - 12 Knee GI DN 1 1/2" 45' 2 bh 16,000 - 13 Knee GI DN 1 1/2" 90' 2 bh 20,000 - 14 Double nipple GI DN 1 1/2" 3 bh 16,000 - 15 Stop kran DN 1 1/2" 1 bh 160,000 - 16 Watermoor GI DN 1 1/2" 1 bh 40,000 - 17 Check valve DN 1 1/2" 1 bh 400,000 - 18 TBA / sealtape 14 bh 3,500 - 19 Pemasangan Pompa lengkap dengan aksesoris 1 unit 600,000 - 20 Murbaut 12 bh 3,000 -

JUMLAH II -

Jumlah Pengajuan Dana 49,973,328

RENCANA ANGGARAN BIAYA (RAB) HIK PAMSIMAS

Desa : Sumber Agung Nomor RAB : 6Kecamata : Klego Pekerjaan/kegiatan : Pengadaan Pompa + listrik sendang serut Kabupaten: Boyolali Ukuran :Provinsi : Jawa Tengah Jumlah : 1 unit

Uraian

Volume Harga Satuan Biaya (Rp)

TotalKontribusi Masyarakat Satuan Rp

TotalKontribusi Masyarakat

inCash inKind inCash inKind1 2 3 4 5 6 7 8=9+10+11 9=3x7 10=4x7 11=5x7

I PEKERJAAN PENYAMBUNGAN LISTRIK A PEKERJAAN PENGADAAN POMPA DAN LISTRIK

1 Pompa 1 1 bh 4,500,000 4,500,000 4,500,000 - - 2 Pipa PVC Ø 1" 10 10 m 5,850 58,500 - - 58,500 3 Pipa PVC Ø 1 1/2" 100 100 m 13,200 1,320,000 - - 1,320,000 4 Knee Ø 1" 1 1 m 2,000 2,000 - - 2,000 5 Knee Ø 1 1/2" 1 1 m 3,500 3,500 - - 3,500 6 SDL Ø 1" 1 1 m 3,000 3,000 - - 3,000 7 SDL Ø 1 1/2" 1 1 m 4,000 4,000 - - 4,000 8 Gembok 1 1 1 bh 50,000 50,000 - 50,000 9 PB Listrik PLN 2200 VA 1 1 bh 3,500,000 3,500,000 3,500,000 - -

10 Kabel NYY 2x2,5 mm 102 102 bh 15,000 1,530,000 - - 1,530,000 11 Box KWH 1 Phase 1 1 bh 300,000 300,000 - - 300,000 12 Stabilizer Stavolt 2200 VA 1 1 bh 1,000,000 1,000,000 - - 1,000,000 13 Pemasangan pompa dan asesori 1 1 ls 300,000 300,000 - - 300,000

JUMLAH 12,571,000 8,000,000 - 4,571,000 Jumlah Total 12,571,000 8,000,000 - 4,571,000

Dibulatkan 12,180,000 8,000,000 4,060,000

Sumber Agung , September 2013Disetujui oleh : Dibuat oleh :

Koordinator LKM SATLAK

( Sunyono ) ( Gunadi )Ketua DPMU Fasilitator HIK

(Martono, ST. ) Tri Martanti,ST NIP. 19630605 199309 1 001

(APBD / (APBD /

APBN) * APBN) *

RENCANA ANGGARAN BIAYA (RAB) HIK PAMSIMAS

Desa : Sumber Agung Nomor RAB : 9Kecamatan : Klego Pekerjaan/kegiatan : Resevoar 3 m (18 m3) Kabupaten : Boyolali Ukuran : 3 x 3 x 2,5 Provinsi : Jawa Tengah Jumlah : 1 unit

UraianVolume Harga Satuan Biaya (Rp)

TotalKontribusi Masyarakat APBN/ Satuan Rp

TotalKontribusi Masyarakat

inCash inKind APBD inCash inKind1 2 3 4 5 6 7 8=9+10+11 9=3x7 10=4x7 11=5x7

1 Bambu 15 5 btg 8,000 40,000 - 40,000 - 2 Pasir pasang 7 1 7 m3 115,000 920,000 - 115,000 805,000 3 Batu pecah 2/3 split 9 2 7 m3 175,000 1,575,000 - 350,000 1,225,000 4 Portland cement (PC) 4071 4071 kg 1,200 4,885,200 - - 4,885,200 5 Kayu tahun 2 2 m3 2,500,000 5,000,000 - - 5,000,000 6 Paku biasa 2"-5" 20 20 kg 10,000 200,000 - - 200,000 7 Besi beton 1196 1196 kg 11,000 13,156,000 - - 13,156,000 8 Bendrat/kawat beton 25 25 kg 16,000 400,000 - - 400,000 9 Plamir 5 5 kg 25,000 125,000 - - 125,000

10 Cat tembok 15 15 kg 25,000 375,000 - - 375,000 11 Pipa GI Ø 1 1/2" in let 1 1 btg 400,000 400,000 - - 400,000 12 Pipa GI Ø 2" penguras 1 1 btg 450,000 450,000 - - 450,000 13 Knee drat GI Ø 1 1/2" 2 2 bh 16,000 32,000 - - 32,000 14 Knee drat GI Ø 2" 1 1 bh 20,000 20,500 - - 20,000 16 Tutup Manhole Plat + Gembok 1 1 bh 500,000 500,000 - - 500,000

Sub Total 1) 28,078,700 - 505,000 27,573,200

Ember 4 4 bh 6,000 24,000 - - 24,000

Sub Total 2) 24,000 - - 24,000

(APBD /APBN) *

A. BAHAN

B. ALAT

1 Pekerja 130 89 41 hok 40,000 5,200,000 - 3,560,000 1,640,000 2 Tukang 99 40 59 hok 50,000 4,950,000 - 2,000,000 2,950,000 3 Kep. Kelompok 10 10 hok 45,000 450,000 - - 450,000

Sub Total 3) 10,600,000 - 5,560,000 5,040,000

Jumlah Total 38,702,700 - 6,065,000 32,637,200

Sumber Agung , September 2013Disetujui oleh : Dibuat oleh :

Koordinator LKM SATLAK

( Sunyono ) ( Gunadi )

Ketua DPMU Fasilitator HIK

(Martono, ST. ) Tri Martanti,ST NIP. 19630605 199309 1 001

C. UPAH

RENCANA ANGGARAN BIAYA (RAB)

Desa : Sumber Agung Nomor RAB : 8Kecamatan : Klego Pekerjaan/kegiatan : Bak Penyaring + Intake Sendang Serut Kabupaten : Boyolali Ukuran : 5,5 x 2 x 2,5 Provinsi : Jawa Tengah Jumlah : 1 unit

UraianVolume Harga Satuan Biaya (Rp)

TotalKontribusi Masyarakat Satuan Rp

TotalKontribusi Masyarakat

inCash inKind inCash inKind1 2 3 4 5 6 7 8=9+10+11 9=3x7 10=4x7 11=5x7

1 Bambu 25 15 10 btg 8,000 200,000 - 120,000 80,000 2 Pasir pasang 12 8 4 m3 115,000 1,380,000 - 920,000 460,000 3 Bata merah 2800 2800 m3 500 1,400,000 - 1,400,000 - 4 Batu blonos/kali 7 4 3 m3 125,000 875,000 - 500,000 375,000 5 Batu pecah 2/3 split 6 4 2 m3 175,000 1,050,000 - 700,000 350,000 6 Portland cement (PC) 2547 5 2542 kg 1,200 3,056,400 - 6,000 3,050,400 7 Kayu tahun 1.4 1.4 m3 2,500,000 3,500,000 - 3,500,000 - 8 Paku biasa 2"-5" 10 10 kg 10,000 100,000 - - 100,000 9 Besi beton 350 350 kg 11,000 3,850,000 - - 3,850,000

10 Bendrat/kawat beton 8 8 kg 16,500 132,000 - - 132,000 11 Cat dasar/ sealer ex dulux 5.5 5.5 kg 50,000 275,000 - - 275,000 12 Cat tembok ex dulux 10 10 kg 50,000 500,000 - - 500,000 13 Pipa outlet GI Ø 3" 1 1 unit/m 125,000 125,000 - - 125,000 14 Pipa hawa GI Ø 2" 1 1 unit 100,000 100,000 - - 100,000 15 Pipa over flow GI Ø 2" 3 3 unit 50,000 150,000 - - 150,000 15 Cek Air 2 2 ls 250,000 500,000 - - 500,000 16 Plat baja tutup manhole+gembok 1 1 unit 500,000 500,000 - - 500,000

Sub Total 1) 17,693,400 - 7,146,000 10,547,400

1 Benang 6 6 rol 1,000 6,000 - - 6,000 2 Cangkul 8 5 3 bh 50,000 400,000 - 250,000 150,000 3 Dandang 6 5 1 bh 45,000 270,000 - 225,000 45,000 4 Ember 15 15 bh 6,000 90,000 - - 90,000

Sub Total 2) 766,000 - 475,000 291,000

(APBD / (APBD /APBN) * APBN) *

A. BAHAN

B. ALAT

1 Pekerja 154 48 104 hok 40,000 6,080,000 - 1,920,000 4,160,000 2 Tukang 70 18 52 hok 50,000 3,500,000 - 900,000 2,600,000 3 Kep. Kelompok 11 11 hok 45,000 495,000 - - 495,000

Sub Total 3) 10,075,000 - 2,820,000 7,255,000

Jumlah Total 28,534,400 - 10,441,000 18,093,400

Sumber Agung, September 2013Disetujui oleh : Dibuat oleh :

Koordinator LKM Satlak Pamsimas

( Sunyono ) ( Gunadi )

Ketua DPMU Fasilitator Teknik

(Martono, ST. ) ( Tri Martanti, ST ) NIP. 19630605 199309 1 001

C. UPAH

RENCANA PENGGUNAAN DANA HIK

PEKERJAAN INTAKEDesa : Sumber AgungKecamatan : KlegoKabupaten : BoyolaliProvinsi : Jawa Tengah

UraianVolume Biaya (Rp)

Kebutuhan Real s/d Pengajuan Jumlah satuan Harga Satuan JumlahTahap Lalu Sekaran Komulatif

1 2 3 4 5 6 7 8

1 Bambu 25 25 25 btg 8,000 200,000 2 Pasir pasang 12 12 12 m3 115,000 1,380,000 3 Bata merah 2800 2800 2800 m3 500 1,400,000 4 Batu blonos/kali 7 7 7 m3 125,000 875,000 5 Batu pecah 2/3 split 6 6 6 m3 175,000 1,050,000 6 Portland cement (PC) 2547 2547 2547 kg 1,200 3,056,400 7 Kayu tahun 1.4 1.4 1.4 m3 2,500,000 3,500,000 8 Paku biasa 2"-5" 10 10 10 kg 10,000 100,000 9 Besi beton 350 350 350 kg 11,000 3,850,000

10 Bendrat/kawat beton 8 8 8 kg 16,500 132,000 11 Cat dasar/ sealer ex dulux 5.5 5.5 5.5 kg 50,000 275,000 12 Cat tembok ex dulux 10 10 10 kg 50,000 500,000 13 Pipa outlet GI Ø 3" 1 1 1 unit/m 125,000 125,000 14 Pipa hawa GI Ø 2" 1 1 1 unit 100,000 100,000 15 Pipa over flow GI Ø 2" 3 3 3 unit 50,000 150,000 15 Cek Air 2 2 2 ls 250,000 500,000 16 Plat baja tutup manhole+gembok 1 1 1 unit 500,000 500,000

Sub Total 1) 17,693,400

1 Benang 6 6 6 rol 1,000 6,000 2 Cangkul 8 8 8 bh 50,000 400,000 3 Dandang 6 6 6 bh 45,000 270,000 4 Ember 15 15 15 bh 6,000 90,000

Sub Total 2) 766,000

1 Pekerja 154 154 154 hok 40,000 6,160,000 2 Tukang 70 70 70 hok 50,000 3,500,000 3 Kep. Kelompok 11 11 11 hok 45,000 495,000

Sub Total 3) 10,155,000

Jumlah Total 28,614,400

A. BAHAN

B. ALAT

C. UPAH

RENCANA ANGGARAN BIAYA (RAB) HIK PAMSIMAS

Nomor RAB : 7Desa : Sumber Agung Pekerjaan/kegiatan : Pengadaan dan Pemasangan Pipa Kecamatan : Klego Transmisi/Distribusi Kabupaten : Boyolali Ukuran : - Provinsi : Jawa Tengah Jumlah : -

UraianVolume Harga Satuan Biaya (Rp)

TotalKontribusi Masyarakat ( APBN Satuan Rp

TotalKontribusi Masyarakat ( APBN

inCash inKind inCash inKind1 2 3 4 5 6 7 8=9+10+11 9=3x7 10=4x7 11=5x7

- Pipa GI dan Assesorisnya : 1 Pipa GI Ø 1 1/2" 1 1 btg 400,000 400,000 - - 400,000 2 Pipa GI Ø 2" 1 1 btg 450,000 450,000 - - 450,000

- Pipa PVC dan Assesorisnya : 1 Pipa PVC Ø 1 1/2" (SNI S-10) SCJ 650 650 m' 15,000 9,750,000 - - 9,750,000 2 Pipa PVC Ø 2" (S-12,5) RRJ 575 575 m' 20,800 11,960,000 - - 11,960,000 3 Pipa PVC Ø 1" (S-10) SC 290 60 230 m' 8,500 2,465,000 510,000 - 1,955,000 3 Long bend Ø 2" 5 5 bh 40,700 203,500 - - 203,500 4 Bend Ø 1 1/2" 10 10 bh 11,300 113,000 - - 113,000 5 SDD/Faucet Socket Ø 2" 4 4 bh 56,300 225,200 - - 225,200 6 SDD/Faucet Socket Ø 1 1/2" 4 4 bh 39,500 158,000 - - 158,000 7 SDL/Valve Socket Ø 3" 0 bh 103,000 - - - - 8 SDL/Valve Socket Ø 2" 4 4 bh 31,600 126,400 - - 126,400 9 SDL/Valve Socket Ø 1 1/2" 2 2 bh 19,400 38,800 - - 38,800

10 Dop/Cap Ø 2" 5 5 bh 70,000 350,000 - - 350,000 11 Dop/Cap Ø 1 1/2" 10 10 bh 20,000 200,000 - - 200,000 12 Tee Ø 2" 10 10 bh 50,300 503,000 - - 503,000 13 Tee Ø 1 1/2" 5 5 bh 14,900 74,500 - - 74,500 14 Reduser Ø 3"x2" 0 bh 55,000 - - - - 15 Reduser Ø 2"x1 1/2" 4 4 bh 21,500 86,000 - - 86,000 16 Tee Reduser Ø 2"x1 1/2" 5 5 bh 50,300 251,500 - - 251,500 17 Gate valve Ø 3" 0 bh 650,000 - - - - 18 Gate valve Ø 2" 3 3 bh 300,000 900,000 - - 900,000 19 Gate valve Ø 1 1/2" 2 2 bh 160,000 320,000 - - 320,000 20 Lubrican 3 3 kaleng 45,000 135,000 - - 135,000

APBD) * APBD) *

A. BAHAN

21 Lem/Tropical Glue 5 5 kaleng 50,000 250,000 - - 250,000

Sub Total 1) 28,959,900 510,000 - 28,449,900

1 Cangkul 5 3 2 bh 50,000 250,000 - 150,000 100,000 2 Dandang 7 4 3 bh 45,000 315,000 - 180,000 135,000 3 Linggis 3 3 bh 50,000 150,000 - 150,000 -

Sub Total 2) 715,000 - 480,000 235,000

1 Pekerja 154 76 78 hok 40,000 6,160,000 - 3,040,000 3,120,000 2 Tukang 81 25 56 hok 50,000 4,050,000 - 1,250,000 2,800,000 3 Kep. Kelompok 10 5 5 hok 45,000 450,000 - 225,000 225,000

Sub Total 3) 10,660,000 - 4,515,000 6,145,000

Jumlah Total 40,334,900 510,000 4,995,000 34,829,900 40,775,000 510,000 4,995,000 35,269,000

Sumber Agung , September 2013Disetujui oleh : Dibuat oleh :

Koordinator LKM SATLAK

( Sunyono ) ( Gunadi )

Ketua DPMU Fasilitator HIK

(Martono, ST. ) Tri Martanti,ST NIP. 19630605 199309 1 001

B. ALAT

C. UPAH

RENCANA ANGGARAN BIAYA (RAB)

Desa : Mergasana Nomor RAB : 13Kecamatan : Kertanegara Pekerjaan/kegiatan : Pelatihan BP-SPAMS Kabupaten : Purbalingga Ukuran : - Provinsi : Jawa Tengah Jumlah : 1 hari

UraianVolume Harga Satuan Biaya (Rp)

TotalKontribusi Masyarakat Satuan Rp

TotalKontribusi Masyarakat

inCash inKind inCash inKind1 2 3 4 5 6 7 8=9+10+11 9=3x7 10=4x7 11=5x7

A. BAHAN ATK PESERTA

1 Modul 20 buah #REF! #REF! #REF! #REF! #REF!

2 Notes book 20 buah 4,500 90,000 - - 90,000

3 Bollpoint 20 buah 2,000 40,000 - - 40,000

4 Pensil 2B 20 buah 3,000 60,000 - - 60,000

5 Penghapus karet 20 buah 2,000 40,000 - - 40,000

6 Garisan mika 20 buah 3,000 60,000 - - 60,000

7 Amplop plastik besar 20 buah 3,000 60,000 - - 60,000

KEBUTUHAN PELATIHAN 1 Kertas plano 10 lembar 500 5,000 - - 5,000

2 Plakban hitam 1 rol 8,500 8,500 - - 8,500

3 Spidol besar 5 buah 7,000 35,000 - - 35,000

4 Foto copy 92 lembar 200 18,400 - - 18,400

BAHAN DAN PERALATAN PRAKTEK 1 Pipa PVC Ø 1/2" 2 batang 13,500 27,000 - - 27,000

2 Meteran air 1 buah 100,000 100,000 - - 100,000

3 Kran 1 buah 15,000 15,000 - - 15,000

4 Gate valve 1 buah 30,000 30,000 - - 30,000

5 Klem saddle 1 buah 20,000 20,000 - - 20,000

6 Knee 4 buah 2,000 8,000 - - 8,000

7 Knee drat dalam 4 buah 2,000 8,000 - - 8,000

8 Shock drat luar 4 buah 2,000 8,000 - - 8,000

9 Lem 1 buah 6,000 6,000 - - 6,000

10 Sealtape 1 buah 5,000 5,000 - - 5,000

(APBD / (APBD /APBN) * APBN) *

11 Dop 1 buah 2,000 2,000 - - 2,000

12 Tee 1 buah 2,000 2,000 - - 2,000

13 Bor manual 1 buah 100,000 100,000 - - 100,000

14 Gergaji besi / pemotong pipa 1 buah 60,000 60,000 - - 60,000

15 Kunci inggris kecil 1 buah 20,000 20,000 - - 20,000

16 Kunci pas 1 set 40,000 40,000 - - 40,000

17 Kunci pipa 2 buah 200,000 400,000 - - 400,000

18 Obeng + 1 buah 20,000 20,000 - - 20,000

19 Obeng - 1 buah 20,000 20,000 - - 20,000

20 Tang potong 1 buah 10,000 10,000 - - 10,000

21 Alat senai ukuran Ø 1,5" ke bawah 1 buah 400,000 400,000 - - 400,000

Sub Total 1) #REF! #REF! #REF! #REF!

1 Konsumsia. Snack (2 kali) 40 orang #REF! #REF! #REF! #REF! #REF!

b. Makan (1 kali) 20 orang #REF! #REF! #REF! #REF! #REF!

2 Transport peserta 20 orang #REF! #REF! #REF! #REF! #REF!

4 Sewa alat peraga 1 hari 200,000 200,000 - - 200,000

5 Sewa LCD proyektor 1 hari #REF! #REF! #REF! #REF! #REF!

6 Sewa sound sistem 1 hari #REF! #REF! #REF! #REF! #REF!

7 Banner spanduk pelatihan 4 m #REF! #REF! #REF! #REF! #REF!

Sub Total 2) #REF! #REF! #REF! #REF!

1 - - - - 2 - - - - 3 - - - -

Sub Total 3) - - - -

Jumlah Total #REF! #REF! #REF! #REF!

Mergasana, Juni 2012Disetujui oleh : Dibuat oleh :

Koordinator LKM Satlak Pamsimas

B. ALAT

C. UPAH

( Amin Muhtadi Sachari ) ( Haryanto )

Ketua DPMU Fasilitator Pemberdayaan

(Drs. Hadiono, ST. ) ( Slamet Suroso, SE. )NIP. 19690614 198903 1 006

JADWAL KEGIATANRENCANA KERJA MASYARAKAT (RKM) PAMSIMAS

Provinsi/ Kabupaten/ Kecamatan/ Desa : Jawa Tengah/ Purbalingga/ Kertanegara/ Mergasana

No KEGIATAN VOLUMEBULAN

Juli Agustus September Oktober Nopember Desember

A. BOP LKM & SATLAK PAMSIMAS 6 kali

B. PELATIHAN TINGKAT MASYARAKAT 2 hari

C. PEMBANGUNAN SAM

1. Sumur Bor Dalam 1 unit

2. Resevoar 3x3x2,5 ( 18 m ) 1 unit

####REF! 1 unit

3. Pengadaan dan Pemasangan Pipa 1 unit

####REF! 1 unit

####REF! 2 unit

####REF! 4782 meter

D. ###

####REF! 5 unit

####REF! 5 unit

####REF! 5 unit

E. KEGIATAN PHBS DI MASYARAKAT

####REF! 1 hari

1. #REF! 1 paket

####REF! 1 paket

F. ### 1 hari

G. PEMBUATAN LAPORAN AKHIR 1 paket

Mergasana, Juni 2012

Disetujui oleh : Dibuat oleh :

Ketua DPMU Koordinator LKM Fasilitator Teknik Satlak Pamsimas

(Drs. Hadiono, ST. ) ( Amin Muhtadi Sachari ) ( Fachru Eko Rahmawan, ST. ) ( Haryanto )

NIP. 19690614 198903 1 006

DAFTAR KONTRIBUSI IN-KIND (TENAGA KERJA)DESA Mergasana KECAMATAN Kertanegara KABUPATEN PURBALINGGA

TAHUN 2011

No NamaAlamat Keahlian Lama Kerja Upah per Jumlah

RT RW P T K/M HOK HOK Rp1 AHMAD HUFRON 4 4 √ 4 30,000.00 120,000.00

2 ALI 2 4 √ 5 25,000.00 125,000.00

3 AMBAR 4 3 √ 5 25,000.00 125,000.00

4 ASMARJA 4 3 √ 5 25,000.00 125,000.00

5 BADI 1 4 √ 5 25,000.00 125,000.00

6 BANDI 2 3 √ 5 25,000.00 125,000.00

7 BAROJI 2 3 √ 5 25,000.00 125,000.00

8 BAROJI 3 4 √ 5 25,000.00 125,000.00

9 BASRI 2 3 √ 5 25,000.00 125,000.00

10 BASUKI 1 3 √ 4 30,000.00 120,000.00

11 BIDIN 2 3 √ 5 25,000.00 125,000.00

12 BISRI 4 4 √ 5 30,000.00 150,000.00

13 BURHANUDIN 3 3 √ 4 30,000.00 120,000.00

14 DADI 4 4 √ 5 25,000.00 125,000.00

15 DAKIR 4 4 √ 5 25,000.00 125,000.00

16 DAMIRI 1 3 √ 5 25,000.00 125,000.00

17 DARIYAH 2 3 √ 5 25,000.00 125,000.00

18 DARJO 3 4 √ 5 25,000.00 125,000.00

19 DARSONO 1 3 √ 5 25,000.00 125,000.00

20 DARTO 2 3 √ 4 30,000.00 120,000.00

21 DARTO 1 4 √ 4 30,000.00 120,000.00

22 DARTONO 4 3 √ 4 30,000.00 120,000.00

23 DATA 3 4 √ 5 25,000.00 125,000.00

24 DIYO 2 4 √ 5 25,000.00 125,000.00

25 DULBARI 2 3 √ 4 30,000.00 120,000.00

26 EDI MURYATO 2 3 √ 4 30,000.00 120,000.00

27 EDI WIBOWO 2 3 √ 5 25,000.00 125,000.00

28 EKA SUBAGYO 2 3 √ 5 25,000.00 125,000.00

29 GIMIN 2 4 √ 5 25,000.00 125,000.00

30 H. MUHADI 2 3 √ 5 25,000.00 125,000.00

31 H. SAMNGANI 1 3 √ 4 30,000.00 120,000.00

32 H. SANTARJA 4 4 √ 5 25,000.00 125,000.00

33 HAMDANI 4 3 √ 4 30,000.00 120,000.00

34 HASAN BASRI 3 3 √ 5 25,000.00 125,000.00

35 JAJI 2 3 √ 5 25,000.00 125,000.00

36 JAMAL 2 4 √ 5 25,000.00 125,000.00

37 JAMASRI 3 4 √ 5 25,000.00 125,000.00

38 JANGI 1 3 √ 5 25,000.00 125,000.00

39 JANGI 4 4 √ 5 25,000.00 125,000.00

40 JUARI 3 3 √ 5 25,000.00 125,000.00

41 JUMAN 1 3 √ 4 30,000.00 120,000.00

42 KAMBARI 1 4 √ 5 25,000.00 125,000.00

43 KAMSUDI 4 4 √ 5 25,000.00 125,000.00

44 KANDAR 2 3 √ 5 25,000.00 125,000.00

45 KARMAN 1 4 √ 5 25,000.00 125,000.00

46 KARPIN 3 4 √ 5 25,000.00 125,000.00

47 KARYO 2 3 √ 4 30,000.00 120,000.00

48 KASDI 4 4 √ 5 25,000.00 125,000.00

49 KASROJI 2 4 √ 5 25,000.00 125,000.00

50 KEPOR 3 4 √ 5 25,000.00 125,000.00

51 KHOPIYAH 3 4 √ 5 25,000.00 125,000.00

52 KOSIM 2 4 √ 4 30,000.00 120,000.00

53 KUNADI 1 4 √ 5 25,000.00 125,000.00

54 KUSDI 2 3 √ 5 25,000.00 125,000.00

55 KUSERI 4 3 √ 5 25,000.00 125,000.00

56 KUSWARI 1 3 √ 4 30,000.00 120,000.00

57 KUSWONO 1 4 √ 5 25,000.00 125,000.00

58 LATIF 2 4 √ 5 25,000.00 125,000.00

59 LIHIN 3 3 √ 4 30,000.00 120,000.00

60 LIHUN 2 3 √ 5 25,000.00 125,000.00

61 LIMAN 1 3 √ 4 30,000.00 120,000.00

62 MADSUHUD 3 3 √ 4 30,000.00 120,000.00

63 MAHMUDIN 3 3 √ 5 25,000.00 125,000.00

64 MAHURI 4 4 √ 5 25,000.00 125,000.00

65 MAHWARI 1 3 √ 5 25,000.00 125,000.00

66 MAKSUDI 2 3 √ 5 25,000.00 125,000.00

67 MAKSUNI 3 4 √ 5 25,000.00 125,000.00

68 MAMAT 2 3 √ 4 30,000.00 120,000.00

69 MARNO 4 4 √ 4 30,000.00 120,000.00

70 MARSUDI 2 4 √ 5 25,000.00 125,000.00

71 MARYO 3 4 √ 4 30,000.00 120,000.00

72 MASNGUD 4 4 √ 5 25,000.00 125,000.00

73 MIARSO 1 4 √ 5 25,000.00 125,000.00

74 MISKUN 2 3 √ 5 25,000.00 125,000.00

75 MISWAN 4 3 √ 5 25,000.00 125,000.00

76 MISWARI 4 4 √ 5 25,000.00 125,000.00

77 MUCHENI 1 3 √ 5 25,000.00 125,000.00

78 MUHADI 1 3 √ 4 30,000.00 120,000.00

79 MUHAMIL 4 3 √ 5 25,000.00 125,000.00

80 MUHEDI 1 3 √ 5 25,000.00 125,000.00

81 MUHERI 4 4 √ 5 25,000.00 125,000.00

82 MUKHOLIL 3 4 √ 5 25,000.00 125,000.00

83 MUKSIN 3 4 √ 5 25,000.00 125,000.00

84 MULYARSA 3 3 √ 5 25,000.00 125,000.00

85 MULYONO 4 3 √ 5 25,000.00 125,000.00

86 MULYONO 3 4 √ 5 25,000.00 125,000.00

87 MUNAH 3 4 √ 5 25,000.00 125,000.00

88 MUNI 4 4 √ 5 25,000.00 125,000.00

89 MUSENI 2 3 √ 4 30,000.00 120,000.00

90 MUSLIH 3 3 √ 5 25,000.00 125,000.00

91 MUSTABI 2 4 √ 5 25,000.00 125,000.00

92 MUSTAJA 3 3 √ 5 25,000.00 125,000.00

93 NAKUM 4 3 √ 5 25,000.00 125,000.00

94 NARIDI 4 4 √ 5 25,000.00 125,000.00

95 NARKOLIN 1 3 √ 5 25,000.00 125,000.00

96 NARWAN 4 4 √ 5 25,000.00 125,000.00

97 NARYO 2 3 √ 5 25,000.00 125,000.00

98 NASIMIN 1 3 √ 5 25,000.00 125,000.00

99 NASIR 2 4 √ 5 25,000.00 125,000.00

100 NUR FAJAR 1 4 √ 5 25,000.00 125,000.00

101 PARJO 2 4 √ 4 30,000.00 120,000.00

102 PARMAN 3 3 √ 5 25,000.00 125,000.00

103 PARNO 4 4 √ 5 30,000.00 150,000.00

104 PUJI MUNANDAR 1 3 √ 5 25,000.00 125,000.00

105 REBO 3 3 √ 4 30,000.00 120,000.00

106 RIBIN 2 4 √ 5 25,000.00 125,000.00

107 RIDIN 2 3 √ 5 25,000.00 125,000.00

108 RIDUN 2 3 √ 4 30,000.00 120,000.00

109 RISNO 4 4 √ 5 25,000.00 125,000.00

110 RISWADI 1 3 √ 4 30,000.00 120,000.00

111 ROBAN 3 3 √ 5 25,000.00 125,000.00

112 ROHIM 2 3 √ 5 25,000.00 125,000.00

113 ROHIMIN 3 3 √ 5 25,000.00 125,000.00

114 ROHMAN 2 4 √ 5 25,000.00 125,000.00

115 ROJIKIN 3 3 √ 5 25,000.00 125,000.00

116 RONI S. 4 3 √ 4 30,000.00 120,000.00

117 ROSIHUN 4 3 √ 4 30,000.00 120,000.00

118 RUDI 3 4 √ 5 25,000.00 125,000.00

119 RUMEDI 2 3 √ 5 25,000.00 125,000.00

120 RUSDI 3 4 √ 5 25,000.00 125,000.00

121 RUSWANDI 1 3 √ 5 25,000.00 125,000.00

122 RUWAT 2 3 √ 5 25,000.00 125,000.00

123 SAHLAN 2 3 √ 4 30,000.00 120,000.00

124 SAHRI 3 4 √ 5 25,000.00 125,000.00

125 SAHUDI 1 3 √ 4 30,000.00 120,000.00

126 SAHURI 4 3 √ 5 25,000.00 125,000.00

127 SAKUM 3 3 √ 5 25,000.00 125,000.00

128 SALIM 4 4 √ 4 30,000.00 120,000.00

129 SAMADI 3 3 √ 5 25,000.00 125,000.00

130 SAMIN 4 4 √ 5 25,000.00 125,000.00

131 SANGRONI 3 3 √ 5 25,000.00 125,000.00

132 SANISRAD 1 4 √ 5 25,000.00 125,000.00

133 SANMUKTI 1 3 √ 5 25,000.00 125,000.00

134 SANROJI 3 3 √ 4 30,000.00 120,000.00

135 SANUSI 1 4 √ 5 25,000.00 125,000.00

136 SANWARI 3 3 √ 5 25,000.00 125,000.00

137 SARYI 2 4 √ 4 30,000.00 120,000.00

138 SAWIN 2 4 √ 5 25,000.00 125,000.00

139 SIDIN 1 4 √ 4 30,000.00 120,000.00

140 SIHUN 3 4 √ 5 25,000.00 125,000.00

141 SIHUN 4 4 √ 5 25,000.00 125,000.00

142 SIMUL 2 3 √ 5 25,000.00 125,000.00

143 SLAMET 4 4 √ 5 25,000.00 125,000.00

144 SOHANI 1 4 √ 5 25,000.00 125,000.00

145 SOHIB 2 4 √ 4 30,000.00 120,000.00

146 SOIM 1 3 √ 5 25,000.00 125,000.00

147 SOLIHIN 3 4 √ 5 25,000.00 125,000.00

148 SUBARYO 2 3 √ 4 30,000.00 120,000.00

149 SUDAR MAULANA 4 3 √ 5 25,000.00 125,000.00

150 SUDIMAN 4 4 √ 5 25,000.00 125,000.00

151 SUHARI 3 3 √ 5 25,000.00 125,000.00

152 SUHARJO 4 3 √ 5 25,000.00 125,000.00

153 SUHEMI 3 4 √ 4 30,000.00 120,000.00

154 SUKHEDI 3 4 √ 5 25,000.00 125,000.00

155 SUKRI 3 3 √ 5 25,000.00 125,000.00

156 SULEMI 3 4 √ 5 25,000.00 125,000.00

157 SUMALI 3 4 √ 5 25,000.00 125,000.00

158 SUMARDI 1 3 √ 5 25,000.00 125,000.00

159 SUMARNO 2 3 √ 5 25,000.00 125,000.00

160 SUMARTO 4 3 √ 5 25,000.00 125,000.00

161 SUMARYO 2 3 √ 5 25,000.00 125,000.00

162 SUMEDI 2 3 √ 4 30,000.00 120,000.00

163 SUMEDI 4 3 √ 5 25,000.00 125,000.00

164 SUPARJI 4 3 √ 5 25,000.00 125,000.00

165 SUPARJO 4 3 √ 5 25,000.00 125,000.00

166 SUPARTA 2 3 √ 5 25,000.00 125,000.00

167 SUPONO 3 3 √ 5 25,000.00 125,000.00

168 SURATNO 1 3 √ 4 30,000.00 120,000.00

169 SUREJI 2 4 √ 5 25,000.00 125,000.00

170 SUTAR 1 3 √ 4 30,000.00 120,000.00

171 SUTARMAN 1 4 √ 5 25,000.00 125,000.00

172 SUTARYO 1 4 √ 4 30,000.00 120,000.00

173 SUWARNO 3 4 √ 5 25,000.00 125,000.00

174 SUWARTO 1 4 √ 5 25,000.00 125,000.00

175 TAMIN 3 4 √ 4 30,000.00 120,000.00

176 TARSUDI 3 3 √ 4 30,000.00 120,000.00

177 TASIMAN 2 3 √ 5 25,000.00 125,000.00

178 TASMIN 2 3 √ 5 25,000.00 125,000.00

179 TIWAN WANTO 1 4 √ 5 25,000.00 125,000.00

180 TOFIK HIDAYAT 2 3 √ 4 30,000.00 120,000.00

181 TOHARI 4 3 √ 5 25,000.00 125,000.00

182 TOMO 2 3 √ 4 30,000.00 120,000.00

183 TUBI 3 3 √ 5 25,000.00 125,000.00

184 TUFLIHUN 2 3 √ 5 25,000.00 125,000.00

185 TUHANTO 2 3 √ 5 25,000.00 125,000.00

186 TUNTO 4 3 √ 5 25,000.00 125,000.00

187 TURMADI 3 4 √ 4 30,000.00 120,000.00

188 TUTUR 3 4 √ 5 25,000.00 125,000.00

189 WAHAD 1 4 √ 4 30,000.00 120,000.00

190 WAHID 3 4 √ 5 25,000.00 125,000.00

191 WAHYUDIN 1 3 √ 4 30,000.00 120,000.00

192 WARDOYO 3 4 √ 4 30,000.00 120,000.00

193 WARID 1 4 √ 5 25,000.00 125,000.00

194 WARTOYO 4 3 √ 5 25,000.00 125,000.00

195 WARYAN 4 4 √ 5 25,000.00 125,000.00

196 WARYO 1 3 √ 5 25,000.00 125,000.00

197 YASTIBI 4 4 √ 5 25,000.00 125,000.00

198 YATIN 1 4 √ 5 25,000.00 125,000.00

199 YITNO 2 4 √ 5 25,000.00 125,000.00

200 YUSRO 2 3 √ 5 25,000.00 125,000.00

JUMLAH 951 24,805,000.00

#REF!

Catatan : #REF!

P : Pekerja

T : Tukang

K/M : Kepala kelompok / Mandor

HOK : Hari orang kerja

DAFTAR KONTRIBUSI IN-KIND (TENAGA KERJA)DESA Mergasana KECAMATAN Kertanegara KABUPATEN PURBALINGGA

TAHUN 2011

No NamaAlamat Keahlian Lama Kerja Upah per Jumlah

RT RW P T K/M HOK HOK Rp1 AHMAD HUFRON 4 4 √ 4 30,000.00 120,000.00 2 ALI 2 4 √ 5 25,000.00 125,000.00 3 AMBAR 4 3 √ 5 25,000.00 125,000.00 4 ASMARJA 4 3 √ 5 25,000.00 125,000.00 5 BADI 1 4 √ 5 25,000.00 125,000.00 6 BANDI 2 3 √ 5 25,000.00 125,000.00 7 BAROJI 2 3 √ 5 25,000.00 125,000.00 8 BAROJI 3 4 √ 5 25,000.00 125,000.00 9 BASRI 2 3 √ 5 25,000.00 125,000.00

10 BASUKI 1 3 √ 4 30,000.00 120,000.00 11 BIDIN 2 3 √ 5 25,000.00 125,000.00 12 BISRI 4 4 √ 5 30,000.00 150,000.00 13 BURHANUDIN 3 3 √ 4 30,000.00 120,000.00 14 DADI 4 4 √ 5 25,000.00 125,000.00 15 DAKIR 4 4 √ 5 25,000.00 125,000.00 16 DAMIRI 1 3 √ 5 25,000.00 125,000.00 17 DARIYAH 2 3 √ 5 25,000.00 125,000.00 18 DARJO 3 4 √ 5 25,000.00 125,000.00 19 DARSONO 1 3 √ 5 25,000.00 125,000.00 20 DARTO 2 3 √ 4 30,000.00 120,000.00 21 DARTO 1 4 √ 4 30,000.00 120,000.00 22 DARTONO 4 3 √ 4 30,000.00 120,000.00 23 DATA 3 4 √ 5 25,000.00 125,000.00 24 DIYO 2 4 √ 5 25,000.00 125,000.00 25 DULBARI 2 3 √ 4 30,000.00 120,000.00 26 EDI MURYATO 2 3 √ 4 30,000.00 120,000.00 27 EDI WIBOWO 2 3 √ 5 25,000.00 125,000.00 28 EKA SUBAGYO 2 3 √ 5 25,000.00 125,000.00 29 GIMIN 2 4 √ 5 25,000.00 125,000.00 30 H. MUHADI 2 3 √ 5 25,000.00 125,000.00 31 H. SAMNGANI 1 3 √ 4 30,000.00 120,000.00 32 H. SANTARJA 4 4 √ 5 25,000.00 125,000.00 33 HAMDANI 4 3 √ 4 30,000.00 120,000.00 34 HASAN BASRI 3 3 √ 5 25,000.00 125,000.00 35 JAJI 2 3 √ 5 25,000.00 125,000.00 36 JAMAL 2 4 √ 5 25,000.00 125,000.00 37 JAMASRI 3 4 √ 5 25,000.00 125,000.00 38 JANGI 1 3 √ 5 25,000.00 125,000.00 39 JANGI 4 4 √ 5 25,000.00 125,000.00 40 JUARI 3 3 √ 5 25,000.00 125,000.00 41 JUMAN 1 3 √ 4 30,000.00 120,000.00 42 KAMBARI 1 4 √ 5 25,000.00 125,000.00 43 KAMSUDI 4 4 √ 5 25,000.00 125,000.00 44 KANDAR 2 3 √ 5 25,000.00 125,000.00 45 KARMAN 1 4 √ 5 25,000.00 125,000.00 46 KARPIN 3 4 √ 5 25,000.00 125,000.00 47 KARYO 2 3 √ 4 30,000.00 120,000.00 48 KASDI 4 4 √ 5 25,000.00 125,000.00 49 KASROJI 2 4 √ 5 25,000.00 125,000.00 50 KEPOR 3 4 √ 5 25,000.00 125,000.00 51 KHOPIYAH 3 4 √ 5 25,000.00 125,000.00 52 KOSIM 2 4 √ 4 30,000.00 120,000.00 53 KUNADI 1 4 √ 5 25,000.00 125,000.00 54 KUSDI 2 3 √ 5 25,000.00 125,000.00 55 KUSERI 4 3 √ 5 25,000.00 125,000.00 56 KUSWARI 1 3 √ 4 30,000.00 120,000.00 57 KUSWONO 1 4 √ 5 25,000.00 125,000.00 58 LATIF 2 4 √ 5 25,000.00 125,000.00 59 LIHIN 3 3 √ 4 30,000.00 120,000.00 60 LIHUN 2 3 √ 5 25,000.00 125,000.00

61 LIMAN 1 3 √ 4 30,000.00 120,000.00 62 MADSUHUD 3 3 √ 4 30,000.00 120,000.00 63 MAHMUDIN 3 3 √ 5 25,000.00 125,000.00 64 MAHURI 4 4 √ 5 25,000.00 125,000.00 65 MAHWARI 1 3 √ 5 25,000.00 125,000.00 66 MAKSUDI 2 3 √ 5 25,000.00 125,000.00 67 MAKSUNI 3 4 √ 5 25,000.00 125,000.00 68 MAMAT 2 3 √ 4 30,000.00 120,000.00 69 MARNO 4 4 √ 4 30,000.00 120,000.00 70 MARSUDI 2 4 √ 5 25,000.00 125,000.00 71 MARYO 3 4 √ 4 30,000.00 120,000.00 72 MASNGUD 4 4 √ 5 25,000.00 125,000.00 73 MIARSO 1 4 √ 5 25,000.00 125,000.00 74 MISKUN 2 3 √ 5 25,000.00 125,000.00 75 MISWAN 4 3 √ 5 25,000.00 125,000.00 76 MISWARI 4 4 √ 5 25,000.00 125,000.00 77 MUCHENI 1 3 √ 5 25,000.00 125,000.00 78 MUHADI 1 3 √ 4 30,000.00 120,000.00 79 MUHAMIL 4 3 √ 5 25,000.00 125,000.00 80 MUHEDI 1 3 √ 5 25,000.00 125,000.00 81 MUHERI 4 4 √ 5 25,000.00 125,000.00 82 MUKHOLIL 3 4 √ 5 25,000.00 125,000.00 83 MUKSIN 3 4 √ 5 25,000.00 125,000.00 84 MULYARSA 3 3 √ 5 25,000.00 125,000.00 85 MULYONO 4 3 √ 5 25,000.00 125,000.00 86 MULYONO 3 4 √ 5 25,000.00 125,000.00 87 MUNAH 3 4 √ 5 25,000.00 125,000.00 88 MUNI 4 4 √ 5 25,000.00 125,000.00 89 MUSENI 2 3 √ 4 30,000.00 120,000.00 90 MUSLIH 3 3 √ 5 25,000.00 125,000.00 91 MUSTABI 2 4 √ 5 25,000.00 125,000.00 92 MUSTAJA 3 3 √ 5 25,000.00 125,000.00 93 NAKUM 4 3 √ 5 25,000.00 125,000.00 94 NARIDI 4 4 √ 5 25,000.00 125,000.00 95 NARKOLIN 1 3 √ 5 25,000.00 125,000.00 96 NARWAN 4 4 √ 5 25,000.00 125,000.00 97 NARYO 2 3 √ 5 25,000.00 125,000.00 98 NASIMIN 1 3 √ 5 25,000.00 125,000.00 99 NASIR 2 4 √ 5 25,000.00 125,000.00

100 NUR FAJAR 1 4 √ 5 25,000.00 125,000.00 101 PARJO 2 4 √ 4 30,000.00 120,000.00 102 PARMAN 3 3 √ 5 25,000.00 125,000.00 103 PARNO 4 4 √ 5 30,000.00 150,000.00 104 PUJI MUNANDAR 1 3 √ 5 25,000.00 125,000.00 105 REBO 3 3 √ 4 30,000.00 120,000.00 106 RIBIN 2 4 √ 5 25,000.00 125,000.00 107 RIDIN 2 3 √ 5 25,000.00 125,000.00 108 RIDUN 2 3 √ 4 30,000.00 120,000.00 109 RISNO 4 4 √ 5 25,000.00 125,000.00 110 RISWADI 1 3 √ 4 30,000.00 120,000.00 111 ROBAN 3 3 √ 5 25,000.00 125,000.00 112 ROHIM 2 3 √ 5 25,000.00 125,000.00 113 ROHIMIN 3 3 √ 5 25,000.00 125,000.00 114 ROHMAN 2 4 √ 5 25,000.00 125,000.00 115 ROJIKIN 3 3 √ 5 25,000.00 125,000.00 116 RONI S. 4 3 √ 4 30,000.00 120,000.00 117 ROSIHUN 4 3 √ 4 30,000.00 120,000.00 118 RUDI 3 4 √ 5 25,000.00 125,000.00 119 RUMEDI 2 3 √ 5 25,000.00 125,000.00 120 RUSDI 3 4 √ 5 25,000.00 125,000.00 121 RUSWANDI 1 3 √ 5 25,000.00 125,000.00 122 RUWAT 2 3 √ 5 25,000.00 125,000.00 123 SAHLAN 2 3 √ 4 30,000.00 120,000.00 124 SAHRI 3 4 √ 5 25,000.00 125,000.00 125 SAHUDI 1 3 √ 4 30,000.00 120,000.00 126 SAHURI 4 3 √ 5 25,000.00 125,000.00 127 SAKUM 3 3 √ 5 25,000.00 125,000.00 128 SALIM 4 4 √ 4 30,000.00 120,000.00 129 SAMADI 3 3 √ 5 25,000.00 125,000.00

130 SAMIN 4 4 √ 5 25,000.00 125,000.00 131 SANGRONI 3 3 √ 5 25,000.00 125,000.00 132 SANISRAD 1 4 √ 5 25,000.00 125,000.00 133 SANMUKTI 1 3 √ 5 25,000.00 125,000.00 134 SANROJI 3 3 √ 4 30,000.00 120,000.00 135 SANUSI 1 4 √ 5 25,000.00 125,000.00 136 SANWARI 3 3 √ 5 25,000.00 125,000.00 137 SARYI 2 4 √ 4 30,000.00 120,000.00 138 SAWIN 2 4 √ 5 25,000.00 125,000.00 139 SIDIN 1 4 √ 4 30,000.00 120,000.00 140 SIHUN 3 4 √ 5 25,000.00 125,000.00 141 SIHUN 4 4 √ 5 25,000.00 125,000.00 142 SIMUL 2 3 √ 5 25,000.00 125,000.00 143 SLAMET 4 4 √ 5 25,000.00 125,000.00 144 SOHANI 1 4 √ 5 25,000.00 125,000.00 145 SOHIB 2 4 √ 4 30,000.00 120,000.00 146 SOIM 1 3 √ 5 25,000.00 125,000.00 147 SOLIHIN 3 4 √ 5 25,000.00 125,000.00 148 SUBARYO 2 3 √ 4 30,000.00 120,000.00 149 SUDAR MAULANA 4 3 √ 5 25,000.00 125,000.00 150 SUDIMAN 4 4 √ 5 25,000.00 125,000.00 151 SUHARI 3 3 √ 5 25,000.00 125,000.00 152 SUHARJO 4 3 √ 5 25,000.00 125,000.00 153 SUHEMI 3 4 √ 4 30,000.00 120,000.00 154 SUKHEDI 3 4 √ 5 25,000.00 125,000.00 155 SUKRI 3 3 √ 5 25,000.00 125,000.00 156 SULEMI 3 4 √ 5 25,000.00 125,000.00 157 SUMALI 3 4 √ 5 25,000.00 125,000.00 158 SUMARDI 1 3 √ 5 25,000.00 125,000.00 159 SUMARNO 2 3 √ 5 25,000.00 125,000.00 160 SUMARTO 4 3 √ 5 25,000.00 125,000.00 161 SUMARYO 2 3 √ 5 25,000.00 125,000.00 162 SUMEDI 2 3 √ 4 30,000.00 120,000.00 163 SUMEDI 4 3 √ 5 25,000.00 125,000.00 164 SUPARJI 4 3 √ 5 25,000.00 125,000.00 165 SUPARJO 4 3 √ 5 25,000.00 125,000.00 166 SUPARTA 2 3 √ 5 25,000.00 125,000.00 167 SUPONO 3 3 √ 5 25,000.00 125,000.00 168 SURATNO 1 3 √ 4 30,000.00 120,000.00 169 SUREJI 2 4 √ 5 25,000.00 125,000.00 170 SUTAR 1 3 √ 4 30,000.00 120,000.00 171 SUTARMAN 1 4 √ 5 25,000.00 125,000.00 172 SUTARYO 1 4 √ 4 30,000.00 120,000.00 173 SUWARNO 3 4 √ 5 25,000.00 125,000.00 174 SUWARTO 1 4 √ 5 25,000.00 125,000.00 175 TAMIN 3 4 √ 4 30,000.00 120,000.00 176 TARSUDI 3 3 √ 4 30,000.00 120,000.00 177 TASIMAN 2 3 √ 5 25,000.00 125,000.00 178 TASMIN 2 3 √ 5 25,000.00 125,000.00 179 TIWAN WANTO 1 4 √ 5 25,000.00 125,000.00 180 TOFIK HIDAYAT 2 3 √ 4 30,000.00 120,000.00 181 TOHARI 4 3 √ 5 25,000.00 125,000.00 182 TOMO 2 3 √ 4 30,000.00 120,000.00 183 TUBI 3 3 √ 5 25,000.00 125,000.00 184 TUFLIHUN 2 3 √ 5 25,000.00 125,000.00 185 TUHANTO 2 3 √ 5 25,000.00 125,000.00 186 TUNTO 4 3 √ 5 25,000.00 125,000.00 187 TURMADI 3 4 √ 4 30,000.00 120,000.00 188 TUTUR 3 4 √ 5 25,000.00 125,000.00 189 WAHAD 1 4 √ 4 30,000.00 120,000.00 190 WAHID 3 4 √ 5 25,000.00 125,000.00 191 WAHYUDIN 1 3 √ 4 30,000.00 120,000.00 192 WARDOYO 3 4 √ 4 30,000.00 120,000.00 193 WARID 1 4 √ 5 25,000.00 125,000.00 194 WARTOYO 4 3 √ 5 25,000.00 125,000.00 195 WARYAN 4 4 √ 5 25,000.00 125,000.00 196 WARYO 1 3 √ 5 25,000.00 125,000.00 197 YASTIBI 4 4 √ 5 25,000.00 125,000.00

198 YATIN 1 4 √ 5 25,000.00 125,000.00 199 YITNO 2 4 √ 5 25,000.00 125,000.00 200 YUSRO 2 3 √ 5 25,000.00 125,000.00

JUMLAH 951 24,805,000.00

#REF!

Catatan : #REF!

P : Pekerja

T : Tukang

K/M : Kepala kelompok / Mandor

HOK : Hari orang kerja

DAFTAR KONTRIBUSI IN-KIND (BAHAN/PERALATAN)DESA Mergasana KECAMATAN Kertanegara KABUPATEN PURBALINGGA

TAHUN 2011

No Bahan/Peralatan Volume SatuanHarga Satuan Jumlah

Keterangan(Rp) (Rp)

1 Bambu #REF! btg 8,000.00 #REF!

2 Pasir pasang #REF! m3 115,000.00 #REF!

3 Pasir urug #REF! m3 75,000.00 #REF!

4 Sirtu #REF! m3 65,000.00 #REF!

5 Bata merah #REF! bj 700.00 #REF!

6 Batu blonos/kali #REF! m3 125,000.00 #REF!

7 Batu pecah 2/3 split #REF! m3 175,000.00 #REF!

8 Kayu tahun #REF! m3 2,500,000.00 #REF!

#REF!

REKAPITULASI RKM#REF!

PROGRAM PENYEDIAAN AIR MINUM DAN SANITASI BERBASIS MASYARAKAT

( PAMSIMAS )Desa #REF!Kecamatan #REF!Kabupaten #REF!Provinsi : Jawa Tengah

NO URAIAN PEKERJAANJUMLAH

APBNAPBD MASYARAKAT

IN CASH IN KIND( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

(1) (2) (4) 5 6 7 (8)=(3+4+5+6+7)

A. BOP LKM & SATLAK PAMSIMAS 6,500,000 6,500,000

B. PELATIHAN TINGKAT MASYARAKAT1. Pelatihan Kelembagaan 740,000 740,000 2. Pelatihan Pengelolaan Administrasi & Keuangan 1,340,000 1,340,000 3. Pelatihan Teknis SAM 818,000 818,000

C. PEMBANGUNAN SAM1. Sumur Bor Dalam 81,429,000 3,594,000 85,024,000 2. Resevoar 3x3x2,5 ( 18 m ) 32,637,200 - 6,065,000 38,702,700 3. Pengadaan dan Pemasangan Pipa 34,829,900 510,000 4,995,000 40,334,900 4 Pekerjaan listrik dan pompa 4,571,000 8,000,000 - 12,571,000 5 intake 18,093,400 - 10,441,000 28,534,400

E. KEGIATAN PHBS DI MASYARAKAT1.### -

TOTAL 86,000,000 85,560,500 21,502,000 21,501,000 214,565,000 TOTAL DIBULATKAN 86,000,000 86,000,000 21,502,000 21,500,000 215,000,000

86,000,000 86,000,000 21,500,000 21,500,000 215,000,000

Disetujui oleh : Dibuat oleh :Ketua DPMU Koordinator LKM #REF! #REF!

#REF! #REF! #REF! #REF!#REF!

REKAPITULASIRENCANA PENGGUNAAN DANA HIK

PROGRAM PENYEDIAAN AIR MINUM DAN SANITASI BERBASIS MASYARAKAT

( PAMSIMAS )Desa #REF!Kecamatan #REF!Kabupaten #REF!Provinsi : Jawa Tengah

NO URAIAN PEKERJAAN

Volume hargaJUMLAH

Kebutuhan Satuan Satuan

( Rp ) ( Rp ) ( Rp ) ( Rp )(1) (2) 3 4 5 6 7 8 9

A. BOP LKM & SATLAK PAMSIMAS 6,500,000 3,253,500 3,253,500 1 3,253,500

B. PELATIHAN TINGKAT MASYARAKAT1 Pelatihan Pengelolaan Administrasi & 1,340,000 1,340,000 1,340,000 unit 1,340,000 2 Pelatihan Teknis SAM 818,000 818,000 818,000 unit 818,000

C. PEMBANGUNAN SAM1. Sumur Bor Dalam 85,024,000 17,040,800 17,040,800 ls 17,040,800 2. Resevoar 38,702,700 34,760,000 34,760,000 unit 34,760,000 3. Pengadaan dan Pemasangan Pipa 40,334,900 4 Pekerjaan listrik dan pompa 12,571,000 - 5 intake 26,109,000 26,109,000 26,109,000 unit 26,109,000

JUMLAH PENGAJUAN 83,321,300 Pembulatan 84,500,000

Terbilang : Delapan Puluh Empat Juta Lima Ratus Ribu Rupiah

Sumber Agung , November 2013

Disetujui oleh :Koordinator Kabupaten Koordinator LKM Fasilitator HIK #REF!

( Ir. Samina,M.Si ) #REF! ( Tri Martanti,ST) #REF!

Real s/d Tahap lalu

Pengajuan Sekarang

Jumlah Komulatif