PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile EAL.pdf · biaya (rab) untuk...
Transcript of PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile EAL.pdf · biaya (rab) untuk...
PT. ESTU ARTHA LANCARPT. ESTU ARTHA LANCARHEAD OFFICEHEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang,Jl. Bangka I no. 4A Lt.2, Pela Mampang,
J k t S l t I d i 12720J k t S l t I d i 12720
PT. ESTU ARTHA LANCARPT. ESTU ARTHA LANCAR
OPERATIONAL OFFICEOPERATIONAL OFFICE
Jakarta Selatan, Indonesia, 12720Jakarta Selatan, Indonesia, 12720
Jl. Ampera Raya No. 18 NKFJl. Ampera Raya No. 18 NKF--Building BBuilding BCilandak Jakarta Selatan IndonesiaCilandak Jakarta Selatan Indonesia
PHONEPHONE
Cilandak, Jakarta Selatan, IndonesiaCilandak, Jakarta Selatan, Indonesia
(62.21) 32151718(62.21) 32151718
FACSIMILEFACSIMILE (62.21) 788 38 541(62.21) 788 38 541
EMAILEMAIL [email protected]@[email protected]@gmail.com
EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE
(2006 (2006 –– 2007)2007) OFFSTAKE STATION INSTALLATIONOFFSTAKE STATION INSTALLATION
(2006 (2006 –– 2007)2007) PERUSAHAAN GAS NEGARA’s SOUTH SUMATRA PERUSAHAAN GAS NEGARA’s SOUTH SUMATRA ––WEST JAVA 4 PIPELINE ONSHORE PROJECT, 32 KM WEST JAVA 4 PIPELINE ONSHORE PROJECT, 32 KM 24” GAS ONSHORE PIPELINE, MUARA BEKASI TO 24” GAS ONSHORE PIPELINE, MUARA BEKASI TO RAWA MAJURAWA MAJURAWA MAJURAWA MAJU
(2007)(2007) LPG PLANT FLOW LINE SYSTEM PHASE 1 GRESIKLPG PLANT FLOW LINE SYSTEM PHASE 1 GRESIK(2007)(2007) LPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIKLPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIK
EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE
(2007)(2007) LPG TANK & LOADING SYSTEM PHASE 1, GRESIKLPG TANK & LOADING SYSTEM PHASE 1, GRESIK
(200(200 2008)2008) EHTYLENE GAS RECEIVING SYSTEM PROJECT PTEHTYLENE GAS RECEIVING SYSTEM PROJECT PT(2007 (2007 –– 2008)2008) EHTYLENE GAS RECEIVING SYSTEM PROJECT PT. EHTYLENE GAS RECEIVING SYSTEM PROJECT PT. STYRINDO MONO INDONESIA, CILEGONSTYRINDO MONO INDONESIA, CILEGON
(2007 (2007 –– 2009)2009) TTU TUBAN PERTAMINA PROJECT, 120 KM 18” FUEL TTU TUBAN PERTAMINA PROJECT, 120 KM 18” FUEL ONSHORE PIPELINE, TUBAN TO SURABAYAONSHORE PIPELINE, TUBAN TO SURABAYA
EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE
(2008 (2008 –– 2009)2009) KAMBUNA ONSHORE PIPELINE AND MODULEKAMBUNA ONSHORE PIPELINE AND MODULE--1 1 ONSHORE RECEIVING FACILITIESONSHORE RECEIVING FACILITIES
(2008 (2008 –– 2009)2009) GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE PROJECTPROJECT
(2009)(2009) PEKERJAAN JASA PEMBORONGAN PEMBUATAN PEKERJAAN JASA PEMBORONGAN PEMBUATAN DOKUMEN (RKS) DAN PERKIRAAN PENGHITUNGANDOKUMEN (RKS) DAN PERKIRAAN PENGHITUNGANDOKUMEN (RKS) DAN PERKIRAAN PENGHITUNGAN DOKUMEN (RKS) DAN PERKIRAAN PENGHITUNGAN BIAYA (RAB) UNTUK PIPANISASI GASBIAYA (RAB) UNTUK PIPANISASI GAS
EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE
((2010)2010) AS BUILT DRAWING AS BUILT DRAWING --as part ofas part of-- SOUTH SUMATRA SOUTH SUMATRA ––WEST JAVA GAS PIPELINE PROJECT PHASE II WEST JAVA GAS PIPELINE PROJECT PHASE II --ONSHOREONSHORE
(2010)(2010) PENGADAAN JASA KONSULTAN DESAIN INSTALASI PENGADAAN JASA KONSULTAN DESAIN INSTALASI KALIBRATOR WARUKALIBRATOR WARUKALIBRATOR WARUKALIBRATOR WARU
(2010) (2010) -- TODAYTODAY SOUTH SUMATERA NGL PROJECTSOUTH SUMATERA NGL PROJECT
EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE
(2010) (2010) -- TODAYTODAY STUDI DAN PENGGANTIAN CROSS COUNTRY STUDI DAN PENGGANTIAN CROSS COUNTRY PIPELINES (1 JALUR PIPA IFO/IDF 24”) DAN STUDY PIPELINES (1 JALUR PIPA IFO/IDF 24”) DAN STUDY DAN PEMINDAHAN JALUR PIPA DAN JALUR KABEL DAN PEMINDAHAN JALUR PIPA DAN JALUR KABEL UNTUK AREA PENYEBERANGAN KALIYASAUNTUK AREA PENYEBERANGAN KALIYASA
((2011) 2011) -- TODAYTODAY UPGRADING / MODIFIKASI FASILITAS INJEKSI AIR UPGRADING / MODIFIKASI FASILITAS INJEKSI AIR PILOT WATERFLOOD LAPANGAN RANTAUPILOT WATERFLOOD LAPANGAN RANTAU REGIONREGIONPILOT WATERFLOOD LAPANGAN RANTAU PILOT WATERFLOOD LAPANGAN RANTAU –– REGION REGION SUMATRASUMATRA
(2010)(2010) TODAYTODAY UPGRADING MUARA BEKASI RECEIVING STATIONUPGRADING MUARA BEKASI RECEIVING STATION(2010) (2010) -- TODAYTODAY UPGRADING MUARA BEKASI RECEIVING STATION UPGRADING MUARA BEKASI RECEIVING STATION
EXPERIENCEEXPERIENCE VARIOUSVARIOUSEXPERIENCEEXPERIENCE
CONSTRUCTIONCONSTRUCTION
(2007)(2007) LPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIKLPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIK
CONSTRUCTIONCONSTRUCTION
(2007)(2007) LPG TANK & LOADING SYSTEM PHASE 1 GRESIKLPG TANK & LOADING SYSTEM PHASE 1 GRESIK(2007)(2007) LPG TANK & LOADING SYSTEM PHASE 1, GRESIKLPG TANK & LOADING SYSTEM PHASE 1, GRESIK
(2007)(2007) PROJECT MANAGEMENT PROJECT MANAGEMENT -- TTU TUBANTTU TUBAN
HUMAN RESOURCESHUMAN RESOURCES
(2007)(2007) PROJECT MANAGEMENT PROJECT MANAGEMENT –– JAMBI MERANG PIPELINEJAMBI MERANG PIPELINE
EXPERIENCEEXPERIENCE VARIOUSVARIOUSEXPERIENCEEXPERIENCE
SUPPLYSUPPLY
(2007)(2007) LPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIKLPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIK
SUPPLYSUPPLY
(2007)(2007) LPG TANK & LOADING SYSTEM PHASE 1 GRESIKLPG TANK & LOADING SYSTEM PHASE 1 GRESIK(2007)(2007) LPG TANK & LOADING SYSTEM PHASE 1, GRESIKLPG TANK & LOADING SYSTEM PHASE 1, GRESIK
(2008)(2008) PT. STYRINDO MONO INDONESIAPT. STYRINDO MONO INDONESIA
OFFSTAKE STATION INSTALLATIONOFFSTAKE STATION INSTALLATIONPROJECT DETAILPROJECT DETAIL
•• Project ManagementProject Management•• Detailed DesignDetailed Design
SERVICESSERVICESTheThe custodycustody transfertransfer stationstation forfor gasgassuppliessupplies fromfrom TGITGI (Transgasindo)(Transgasindo) intointo
PROFILEPROFILE
gg•• ConstructionConstruction•• CommissioningCommissioning•• AsAs--builtbuilt•• Hand over DocumentationHand over Documentation
pppp ( g )( g )PGNPGN NaturalNatural GasGas RiauRiau DistributionDistributionNetworkNetwork.. TheThe CapacityCapacity isis UpUp toto 150150MMSCFDMMSCFD
FiscalFiscal MeteringMetering StationStation includedincluded ::FirstFirst Filtration,Filtration, InletInlet Filters,Filters, MetersMeters(Ultrasonic),(Ultrasonic), Chromatographs,Chromatographs,Analyzers,Analyzers, ControlControl Valves,Valves, Regulators,Regulators,y ,y , ,, g ,g ,Odorize,Odorize, CorrosionCorrosion Inhibitor,Inhibitor, ProcessProcessPipePipe work,work, VentingVenting PipePipe work,work,InstrumentationInstrumentation andand Controls,Controls, Scada,Scada,Switchboards,Switchboards, DieselDiesel Generators,Generators, andand
PT. YUAN SEJATIPT. YUAN SEJATI
CLIENTCLIENT
,, ,,TransformersTransformers..
BuildingsBuildings includedincluded ::Administration,Administration, ControlControl Room,Room, FireFire,, ,,Station,Station, Utilities,Utilities, MeteringMetering Shelter,Shelter,AnalyzerAnalyzer ShelterShelter andand GuardGuard HouseHouse..
SOUTH SUMATRA SOUTH SUMATRA –– WEST JAVA PIPELINE ONSHOREWEST JAVA PIPELINE ONSHOREPROJECT DETAILPROJECT DETAIL
•• Detailed DesignDetailed Design•• Procurement AssistanceProcurement Assistance
SERVICESSERVICESPGN’sPGN’s SouthSouth SumatraSumatra –– WestWest JavaJava 44PipelinePipeline OnshoreOnshore Project,Project, 3232 KMKM 2424””
PROFILEPROFILE
•• Construction EngineeringConstruction Engineering•• AsAs--builtbuilt•• Hand over DocumentationHand over Documentation
pp j ,j ,GasGas OnshoreOnshore Pipeline,Pipeline, MuaraMuara BekasiBekasi totoRawaRawa MajuMaju withwith capasitycapasity upup toto 400400MMSCFDMMSCFD
PipelinePipeline includedincluded ::PipelinePipeline DetailedDetailed EngineeringEngineering consistsconsistsofof:: 44 BlockBlock ValveValve Station,Station, RiverRiver andandRoadRoad Crossings,Crossings, AnchorAnchor Blocks,Blocks,g ,g , ,,CathodicCathodic ProtectionProtection SystemSystem
PT. CITRA PANJI MANUNGGAL forPT. CITRA PANJI MANUNGGAL forPT. Perusahaan Gas Negara (Tbk.)PT. Perusahaan Gas Negara (Tbk.)
CLIENTCLIENT
g ( )g ( )
LPG PLANT FLOW LINE SYSTEM PHASE 1LPG PLANT FLOW LINE SYSTEM PHASE 1PROJECT DETAILPROJECT DETAIL
•• Project Project Management ConsultantManagement Consultant•• Detailed DesignDetailed Design
SERVICESSERVICESTheThe NetworkNetwork withwith capacitycapacity UpUp toto 4040MMSCFDMMSCFD
PROFILEPROFILE
gg•• Hand over DocumentationHand over Documentation
Including in this project :Including in this project :•• Procurement / Material SuppliesProcurement / Material Supplies
FiscalFiscal MeteringMetering StationStation includedincluded ::FirstFirst Filtration,Filtration, InletInlet Filters,Filters, MetersMeters(Orifice),(Orifice), Chromatographs,Chromatographs, Analyzers,Analyzers, pppp
•• Construction, Commissioning & AsConstruction, Commissioning & As--builtbuilt
( ),( ), g p ,g p , y ,y ,ControlControl Valves,Valves, Regulators,Regulators, ProcessProcessPipePipe work,work, VentingVenting PipePipe work,work,InstrumentationInstrumentation andand ControlsControls
PT. MEDIA KARYA SENTOSA (Media PT. MEDIA KARYA SENTOSA (Media Energy)Energy)
CLIENTCLIENT
gy)gy)
LPG TANK & LOADING SYSTEM PHASE 1LPG TANK & LOADING SYSTEM PHASE 1PROJECT DETAILPROJECT DETAIL
SERVICESSERVICESTheThe NetworkNetwork withwith capacitycapacity UpUp toto 4040MMSCFDMMSCFD
PROFILEPROFILE•• Project Project Management Management ConsultantConsultant•• Detailed DesignDetailed Design
FiscalFiscal MeteringMetering StationStation includedincluded ::TankTank System,System, FlareFlare HeaderHeader SystemSystemincludingincluding FlareFlare SubSub--system,system, LoiadingLoiading
gg•• Hand over DocumentationHand over Documentation
Including in this project :Including in this project :•• Procurement / Material SuppliesProcurement / Material Suppliesgg y ,y , gg
Facilities,Facilities, FlareFlare Stack,Stack, TankTank gauginggaugingSystem,System, PumpPump Syatem,Syatem, InstrumentationInstrumentationandand ControlControl SystemSystem
pppp•• Construction, Commissioning & AsConstruction, Commissioning & As--
builtbuilt
PT. MEDIA KARYA SENTOSA (Media PT. MEDIA KARYA SENTOSA (Media Energy)Energy)
CLIENTCLIENT
gy)gy)
EHTYLENE GAS RECEIVING SYSTEMEHTYLENE GAS RECEIVING SYSTEMPROJECT DETAILPROJECT DETAIL
•• Detailed DesignDetailed Design•• Procurement AssistanceProcurement Assistance
SERVICESSERVICESEhtyleneEhtylene GasGas ReceivingReceiving SystemSystem ProjectProjectofof PTPT.. StyrindoStyrindo MonoMono IndonesiaIndonesia hashas
PROFILEPROFILE
•• Construction EngineeringConstruction Engineering•• CommissioningCommissioning•• AsAs--builtbuilt•• Hand over DocumentationHand over Documentation
yycapacitycapacity UpUp toto 4545 PsiPsi ofof EthyleneEthylene GasGas
CompressorCompressor includedincluded ::ComppressorComppressor Units,Units, FirstFirst Filtration,Filtration, InletInlet
•• Fitting Supplies (Variation Order)Fitting Supplies (Variation Order)pppp ,, ,,
Filters,Filters, CoriolisCoriolis Meters,Meters,Chromatographs,Chromatographs, Analyzers,Analyzers, ControlControlValves,Valves, Regulators,Regulators, ProcessProcess PipePipe work,work,VentingVenting PipePipe work,work, InstrumentationInstrumentation andandgg pp ,,ControlsControls..
PT. CITRA PANJI MANUNGGAL forPT. CITRA PANJI MANUNGGAL forPT. Styrindo Mono Indonesia, CilegonPT. Styrindo Mono Indonesia, Cilegon
CLIENTCLIENT
y gy g
TTU TUBAN PERTAMINA PROJECTTTU TUBAN PERTAMINA PROJECTPROJECT DETAILPROJECT DETAIL
•• Detailed DesignDetailed Design•• Project ManagementProject Management
SERVICESSERVICESTTUTTU TubanTuban PERTAMINAPERTAMINA ProjectProject ofof 136136KMKM 1616”” FuelFuel OnshoreOnshore PipelinePipeline TubanTuban toto
PROFILEPROFILE
j gj g•• Procurement AssistanceProcurement Assistance•• Construction EngineeringConstruction Engineering•• AsAs--builtbuilt•• Hand over DocumentationHand over Documentation
ppSurabayaSurabaya withwith capacitycapacity ofof 1515,,000000 barrelbarrelperper--dayday
PipelinePipeline includedincluded ::ppPipelinePipeline DetailedDetailed DesignDesign consistsconsists ofof:: 22HDD,HDD, 1313 BlockBlock Valve,Valve, RoadRoad andand RiverRiverCrossings,Crossings, SwampSwamp Area,Area, AnchorAnchor Blocks,Blocks,CathodicCathodic protectionprotection SystemSystempp yy
PT. CITRA PANJI MANUNGGAL forPT. CITRA PANJI MANUNGGAL forPT. PERTAMINA (Persero)PT. PERTAMINA (Persero)
CLIENTCLIENT
( )( )
KAMBUNA PIPELINE & RECEIVING FACILITIESKAMBUNA PIPELINE & RECEIVING FACILITIESPROJECT DETAILPROJECT DETAIL
•• Electrical and Instrumentation Electrical and Instrumentation Detailed DesignDetailed Design
SERVICESSERVICES5757 KMKM OffshoreOffshore toto OnshoreOnshore PipelinePipeline andandModuleModule--11 OnshoreOnshore ReceivingReceiving FacilitiesFacilities
PROFILEPROFILE
gg•• Hand over DocumentationHand over Documentation
ggGelagahGelagah KambunaKambuna
ElectricalElectrical andand InsturmentationInsturmentation includedincluded ::PressurePressure Transmitter,Transmitter, PressurePressure,,Indicator,Indicator, TemperatureTemperature Transmitter,Transmitter,TemperatureTemperature Indicator,Indicator, PressurePressure ControlControlValve,Valve, SilenoidSilenoid Valve,Valve, PressurePressure SafetySafetyValve,Valve, CorrosionCorrosion Coupon,Coupon, CorrosionCorrosion,, p ,p ,Probe,Probe, PigPig Signal,Signal, ElectricalElectrical Grounding,Grounding,ElectricalElectrical Lighting,Lighting, TubingTubing LayoutLayout..
PT. CITRA PANJI MANUNGGAL for Asia PT. CITRA PANJI MANUNGGAL for Asia Petroleum DevelopmentPetroleum Development
CLIENTCLIENT
pp
GUNUNG MEGANG SINGA GAS BOOSTER PIPELINEGUNUNG MEGANG SINGA GAS BOOSTER PIPELINEPROJECT DETAILPROJECT DETAIL
•• Detailed DesignDetailed Design•• Procurement AssistanceProcurement Assistance
SERVICESSERVICES1717,,55 KMKM OnshoreOnshore GunungGunung MegangMegangSingaSinga GasGas BoosterBooster PipelinePipeline ProjectProject..
PROFILEPROFILE
•• Construction EngineeringConstruction Engineering•• AsAs--builtbuilt•• Hand over DocumentationHand over Documentation
gg pp jj
CompressorCompressor andand PipelinePipeline includedincluded ::ComppressorComppressor Units,Units, ControlControl Valves,Valves,Process,Process, PipelinePipeline DetailedDetailed Design,Design,,, pp g ,g ,InstrumentationInstrumentation andand Controls,Controls, ElectricalElectricalandand CivilCivil WorksWorks..
PT. CITRA PANJI MANUNGGAL for PT. CITRA PANJI MANUNGGAL for Medco EnergyMedco Energy
CLIENTCLIENT
gygy
DOKUMEN RKS DAN RAB UNTUK PIPANISASI GASDOKUMEN RKS DAN RAB UNTUK PIPANISASI GASPROJECT DETAILPROJECT DETAIL
•• Detailed DesignDetailed Design•• Cost EstimationCost Estimation
SERVICESSERVICESEngineeringEngineering andand CostCost EstimationEstimation forforGasGas PipelinePipeline ofof PTPT.. PerusahaanPerusahaan ListrikListrik
PROFILEPROFILE
ppNegaraNegara (PLN),(PLN), CilegonCilegon -- BantenBanten
PipelinePipeline includedincluded ::ControlControl Valves,Valves, Process,Process, PipelinePipeline,, ,, ppDetailedDetailed Design,Design, InstrumentationInstrumentation andandControls,Controls, ElectricalElectrical andand CivilCivil WorksWorks..
PT. PERUSAHAAN LISTRIK NEGARAPT. PERUSAHAAN LISTRIK NEGARA
CLIENTCLIENT
SOUTH SUMATRA WEST JAVA GAS PIPELINE PhaseSOUTH SUMATRA WEST JAVA GAS PIPELINE Phase--IIIIPROJECT DETAILPROJECT DETAIL
•• AsAs--Built Drawing (Alignment Sheet)Built Drawing (Alignment Sheet)
SERVICESSERVICESPGN’sPGN’s SouthSouth SumatraSumatra –– WestWest JavaJavaPhasePhase--IIII PipelinePipeline Project,Project, 195195 KMKM 3636””
PROFILEPROFILE
pp j ,j ,GasGas PipelinePipeline
Joint Operation of PT. CITRA PANJI Joint Operation of PT. CITRA PANJI MANUNGGAL, PT. Remaja Bangun MANUNGGAL, PT. Remaja Bangun
CLIENTCLIENT
j gj gKencana Kontraktor, PT. Winatek Widita Kencana Kontraktor, PT. Winatek Widita (CRW Joint Operation) for(CRW Joint Operation) forPT. Perusahaan Gas Negara PT. Perusahaan Gas Negara (Persero)(Persero)
KONSULTAN DESAIN INSTALASI KALIBRATOR WARUKONSULTAN DESAIN INSTALASI KALIBRATOR WARUPROJECT DETAILPROJECT DETAIL
•• Detailed Engineering DesignDetailed Engineering Design•• Cost EstimationCost Estimation
SERVICESSERVICESWaruWaru CalibratorCalibrator MachineMachine DesignDesign andandProjectProject ManagementManagement Consultancy,Consultancy,
PROFILEPROFILE
•• Project Management ConsultantProject Management Consultant•• Procurement Assistance and Procurement Assistance and
SupervisorySupervisory•• Construction SupervisoryConstruction Supervisory
jj gg y,y,SurabayaSurabaya
DesainDesain InstalasiInstalasi KalibratorKalibrator WaruWaruincludedincluded :: p yp y
•• Hand over DocumentationHand over DocumentationDetailDetail DesignDesign ofof CalibratorCalibrator Unit,Unit,ElectricalElectrical andand CivilCivil WorksWorks;; andand ProjectProjectManagementManagement ConsultantConsultant forfor CalibratorCalibratorInstallationInstallation..
PT. PT. PerusahaanPerusahaan Gas Negara (Gas Negara (PerseroPersero) ) , , SurabayaSurabaya
CLIENTCLIENT
yy
SOUTH SUMATERA NGL PROJECTSOUTH SUMATERA NGL PROJECTPROJECT DETAILPROJECT DETAIL
•• Topography Survey and Soil Topography Survey and Soil InvestigationInvestigation
SERVICESSERVICESOneOne ((11)) 88 inchinch NominalNominal DiameterDiameter singlesingleNGLNGL PipelinePipeline -- SouthSouth SumatraSumatra NGLNGL
PROFILEPROFILE
gg•• Detailed Engineering DesignDetailed Engineering Design•• Procurement Procurement Assistance and Assistance and
SupervisorySupervisory•• Hand over DocumentationHand over Documentation
ppProject,Project, 8989..6060 KilometersKilometers fromfromPrabumulihPrabumulih BaratBarat StationStation toto PulauPulauLayangLayang -- Palembang,Palembang, SouthSouth SumatraSumatra..
PT. KELSRI PT. KELSRI andand PT. TRIPPT. TRIPATRA ATRA forforPT. E1PT. E1--PertagasPertagas
CLIENTCLIENT
gg
STUDI PENGGANTIAN CROSS COUNTRY PIPELINESSTUDI PENGGANTIAN CROSS COUNTRY PIPELINESPROJECT DETAILPROJECT DETAIL
•• Topography Survey and Soil Topography Survey and Soil InvestigationInvestigation
SERVICESSERVICES2424 inchinch DiameterDiameter PipelinePipeline ReplacementReplacement–– PertaminaPertamina RefineryRefinery UnitUnit IVIV Project,Project,
PROFILEPROFILE
gg•• Detailed Engineering DesignDetailed Engineering Design•• Cost EstimationCost Estimation•• Hand over Hand over DocumentationDocumentation•• Project Management ConsultantProject Management Consultant
yy j ,j ,77,,0000 KilometersKilometers fromfrom PertaminaPertamina RURU IVIVtoto AreaArea 7070,, CilacapCilacap..
j gj g
PT. Pertamina Refinery Unit IV CilacapPT. Pertamina Refinery Unit IV Cilacap
CLIENTCLIENT
UPGRADING FASILITAS AIR PILOT WATERFLOODUPGRADING FASILITAS AIR PILOT WATERFLOODPROJECT DETAILPROJECT DETAIL
•• Detailed Engineering DesignDetailed Engineering Design•• Procurement Assistance and Procurement Assistance and
SERVICESSERVICESUpgradingUpgrading // ModifikasiModifikasi FasilitasFasilitas InjeksiInjeksiAirAir PilotPilot WaterfloodWaterflood LapanganLapangan RantauRantau ––
PROFILEPROFILE
SupervisorySupervisory•• Hand over DocumentationHand over Documentation
p gp gRegionRegion SumatraSumatra consistconsist ofof RevitalizationRevitalizationofof WaterWater TreatmentTreatment PlanPlan atat AlurAlurBambanBamban,, InstallationInstallation ofof NewNew WaterWaterInjectionInjection PlanPlan atat PPPPPP -- RantauRantau,,jj ,,RehabilitationRehabilitation ofof 33,,55 KMKM –– 1212”” Pipeline,Pipeline,InstallationInstallation ofof 33,,55 KMKM –– 88”,”, 33 KMKM –– 66”,”,1313KMKM –– 22”” PipelinesPipelines
PT. PT. CitraCitra PanjiPanji ManunggalManunggal forforPT. Pertamina EPPT. Pertamina EP
CLIENTCLIENT
UPGRADING MUARA BEKASI RECEIVING STATIONUPGRADING MUARA BEKASI RECEIVING STATIONPROJECT DETAILPROJECT DETAIL
•• Topography SurveyTopography Survey•• Detailed Engineering DesignDetailed Engineering Design
SERVICESSERVICESUpgradingUpgrading MuaraMuara BekasiBekasi ReceivingReceivingStationStation fromfrom 440440 MMSCFDMMSCFD toto 880880
PROFILEPROFILE
g g gg g g•• Procurement Assistance and Procurement Assistance and
SupervisorySupervisory•• Hand over DocumentationHand over Documentation•• As Build DrawingAs Build Drawing
MMSCFDMMSCFD andand futurefuture connectionconnection..
gg
PT. PT. ELNUSA ELNUSA forforPT. Perusahaan Gas Negara (Persero)PT. Perusahaan Gas Negara (Persero)
CLIENTCLIENT
g ( )g ( )
REGISTRATIONREGISTRATION•• Establishment DeedEstablishment Deed No. No. 102, 102, 16 April 199316 April 1993
((Ny SP Henny Shidky SH)Ny SP Henny Shidky SH)
REGISTRATIONREGISTRATION
((Ny. SP Henny Shidky SH)Ny. SP Henny Shidky SH)
•• Latest Alteration DeedLatest Alteration Deed No. 1, 1 Oktober 2009No. 1, 1 Oktober 2009(Hj. Suzie FH. Tadjoedin SH)(Hj. Suzie FH. Tadjoedin SH)
•• Legalization of Latest Legalization of Latest Alteration DeedAlteration Deed
No. AHUNo. AHU--04684.AH.01.02 04684.AH.01.02 –– th 2009, 12 Februari 2009th 2009, 12 Februari 2009(Minister of Justice)(Minister of Justice)
•• Company Register Number Company Register Number (TDP)(TDP)
No. 09.03.1.51.57058No. 09.03.1.51.57058(P k t Ad J k t S l t S k Di P i d )(P k t Ad J k t S l t S k Di P i d )(TDP)(TDP) (Pemkot Adm. Jakarta Selatan, Suku Dinas Perindag) (Pemkot Adm. Jakarta Selatan, Suku Dinas Perindag)
•• Nomor Pokok Wajib PajakNomor Pokok Wajib Pajak(NPWP)(NPWP)
01.620.462.001.620.462.0--014.000014.000
•• Inauguration date ofInauguration date ofPengusaha Kena PajakPengusaha Kena Pajak (PKP)(PKP)
9 January 20089 January 2008
•• Domicilie ReferenceDomicilie Reference No. 857/1.824No. 857/1.824(Pemda DKI, Kelurahan Pela Mampang)(Pemda DKI, Kelurahan Pela Mampang)