PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon...

46
Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF, ACIArb, ACPE. FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected] www.sarwonohm.com PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK INSTITUSI PEMERINTAH. Seminar Nasional Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention Centre

Transcript of PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon...

Page 1: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF, ACIArb, ACPE. FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected] www.sarwonohm.com

PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK INSTITUSI PEMERINTAH.

Seminar Nasional Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention Centre

Page 2: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Name : Sarwono Hardjomuljadi Dr, Ir, MSc (Civ); MSBA (Bus); MH (Law) MDBF(ADR);ACPE (Eng); ACIArb (Arb)

Place & Date of birth Pekalongan, 6 Juni 1953 Address : Taman Alfa Indah F6/23, Jakarta 11640 E-mail [email protected]

[email protected] Web : www.sarwonohm.com Mobile : +62-811-844-903

Sarwono adalah Staf Khusus Menteri Pekerjaan Umum (2009-2014), Wakil Ketua LPJK Nasional (2011-2015), Sarjana Teknik Sipil Universitas Parahyangan, S2 Iteknik Sipil Institut Teknologi Bandung, S2 Hukum Universitas Tarumanagara (cum laude) dan S3 Construction Contract Management (cum laude). Karirnya diawali di PT PLN (Persero) sebagai staf di proyek PLTA Saguling, kemudian PLTA Cirata di Jawa Barat, kemudian PLTA Renun di Sumatera Utara, sebelum kembali ke Kantor Pusat sebagai Deputi Direktur, Vice President dan pindah sebagai Ditrektur di perusahaan joint venture Pertamina-PLN. Saat ini merupakan satu-satunya putra Indonesia yang mendapatkan akreditasi dari Federation Internationale des Ingenieure Conseils (FIDIC), Sarwono adalah Country Representative dari Dispute Resolution Board Foundation. (DRBF-Seattle), Member Chartered Institutie of Arbitrator (CIArb-London), Member Dispute Board Federation (DBF-Geneva), ASEAN Chartered Professional Engineer (ACPE)

Page 3: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

ASPEK LEGAL DAN ADMINISTRASI KONTRAK

Kontrak Konstruksi

Klaim Konstruksi

Penyelesaian Sengketa

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 4: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

KONTRAK  KONSTRUKSI  

Seminar Nasional Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention Centre

Page 5: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

KUH  Perdata  1338    Semua  perjanjian  yang  dibuat  secara  sah  berlaku  sebagai  undang-­‐

undang  bagi  mereka  yang  membuatnya.    

Suatu  perjanjian  Edak  dapat  ditarik  kembali  selain  dengan  sepakat  kedua  belah  pihak,  atau  karena  alasan-­‐alasan  yang  oleh  

undang-­‐undang  dinyatakan  cukup  untuk  itu.    

Suatu  perjanjian  harus  dilaksanakan  dengan  iEkad  baik.  

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 6: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Garner (2004) “Contract is an agreement between two or more parties creating obligations that are enforceable or otherwise recognizable at law”

(Bryan A.Garner (2004): “Black’s Law Dictionary”, Thomson West)

Martin and Law (2006) “Contract is a legally binding agreement. Agreement arises as a result of “offer and acceptance”, but a number of

other requirements must be satisfied for an agreement to be legally binding”.

Elizabeth A Martin and Jonathan Law (2006): “Oxford Dictionary of Law”, Oxford University Press

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 7: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Chow (2006) “Contract is a legally binding agreement formed when one party accepts an offer made by another and which fulfills the conditions”

(Chow Kok Fong (2006): ” Construction Contracts Dictionary”, Sweet & Maxwell Asia)

John Adriaanse (2010) said that “A variety of factors makes a construction contract different from most other types of contracts. These include the length of the project, its complexity, its size and the fact that the price agreed and the

amount of work done may change as it proceeds

John Adriaanse (2010): “Construction Contract Law : The Essential s“

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 8: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

In a judgement by Lord Wensleydale in 1861 said— “The question is not what the parties to a deed or other documents may have intended to do by entering into that deed, but what is the meaning of the words used in that deed: a most important distinction in all cases of construction and disregard of which often leads to erroneous conclusions”.

It was even more strongly put in the judgement by Sir Gorell Barnes in 1907 when he said— “What a man intends and the expression of his intention are two different things. He is bound and those who take after him are bound by his expressed intention. If that expressed intention is unfortunately different from what he really desires, so much the worse for those who wish the actual intention to prevail.”

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 9: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Suatu Persyaratan Umum Kontrak yang adil dan berimbang , mempunyai arti sangat penting tidak hanya bagi kontraktor, tetapi juga bagi pengguna jasa. Persyaratan Umum Kontrak yang tidak adil dan berimbang (unilateral contract) dapat menyebabkan terjadinya sengketa antara pengguna jasa dan kontraktor, yang mengakibatkan “pengguna jasa di pihak yang dirugikan (employer is the looser). Jika kontraktor menang, pengguna jasa harus mengeluarkan biaya ganti rugi kepada kontraktor, sbaliknya jika pengguna jasa yang menang maka pengguna jasa tetap harus membayar “biaya” dari sengketa yang terjadi, karena terjadinya kemungkinan “kualitas yang jelak” dan/atau terjadinya keterlambatan penyelesaian pekerjaan yang pada akhirnya mengakibatkan terlambatnya “revenue” yang diharapkan dari pengoperasian asset tersebut.

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 10: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

So   I   can   only   venture   to   guess   that   DRBs   were   never   adopted   in  Singapore   either   due   to   the   ignorance   of   its   benefits   or   its  was   in   the  “Bad-­‐ol’-­‐days”   when   the   Supervising   Officer   assumed   the   deified  posiEon   of   someone  who   knew   everything,   could   never   be  wrong   and  could   not   be   contradicted,   in   short,   “He-­‐who-­‐must-­‐be-­‐obeyed”  personified.      But  we  must  also  remember  in  those  days  it  was  common  place  to  have  employers   squeezing   main   contractors,   main   contractors   squeezing  subcontractors  and  suppliers    and  so  on  down  the  line.      JusEce  of  Supreme  Court  QuenEn  Loh,  Singapore  

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 11: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

HHJ Newey (1991) “I think the most important background fact which I should keep in mind is that building construction is not like the manufacture of goods in factory, The size of the project, site conditions, the use of many materials and the employment of various kinds of operatives make it virtually impossible to achieve the same degree of perfection that a manufacturer can. It must be a rare new building in which ever screw and every brush of paint is absolutely correct”

Page 12: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 13: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

KLAIM  KONSTRUKSI    

Seminar Nasional Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention Centre

Page 14: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Hanvey (2005) [19]“ One of the most common issues impacting construction projects is inadequate or incomplete design documents”

Fisk (2003) [21] “Differing site conditions is the one of the most misunderstood of all contract provisions, and the one that is frequently the cause of large contractor claims for additional work and change orders”.

Arditi and Patel (1989) [20] “ Most of the typical claims are caused by factors differing site conditions”.

Barrie & Paulson (1992) [22] “Changed conditions when the actual physical conditions or other jobsite condition prove different from those foreseeable from the plans and specifications” CLAIM

© Dr. Sarwono Hardjomuljadi

Page 15: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Garner (2004) [16] “A demand for money, property, or a legal remedy to which one asserts a right”

Martin and Law (2006) [18] “Claim is A demand for a remedy or ascertain of a right, especially the right to take a particular case to court”

CLAIM

Government Regulation of the Republic of Indonesia No 24/2005: “Claim is a certain amount requested by the contractor to the employer to recover the expenses those are not included in the contract price”.

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 16: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

(The action of demanding something, which one lost before hand, because of one’s right to recover it). Hardjomuljadi et al (2006)

Gambaran sederhana adalah seseorang yang mempergunakan jasa angkutan udara akan menyerahkan bagasinya kepada perusahaan penerbangan untuk selanjutnya mengklaim kembali bagasinya (baggage claim) pada saat sampai ditempat tujuan penerbangan

Klaim  dalam  proyek  konstruksi  adalah  sesuatu  yang  wajar  dan  biasa  terjadi  

kesadaran  akan  klaim  (claim  consciousness)  atau  keakraban  dengan  klaim  (ac,ve  familiarity  with  claims)  dari  para  pihak  juga  akan  lebih  baik  

Penyelesaian  Klaim  dapat  lebih    profesional  dan  santun.  

DEFINISI  KLAIM  

Page 17: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Physical  Causal  Factors  of  Claim  

Page 18: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

EMPLOYER RESPONDENT: 42, VARIABLE: 59

(ANALYSIS BY RELATIVE IMPORTANCE INDEX)

Faktor RII A5 0.785714 D05 0.781746 A6 0.765873 A7 0.746032 D06 0.742063 C10 0.742063 A18 0.738095 A12 0.738095 B05 0.734127 A11 0.734127 D02 0.722222 D03 0.718254 D01 0.718254 C07 0.706349 A14 0.706349

DIFFERENT INTERPRETATION OF CONTRACT DOC.(D05)  

CHANGES IN DESIGN (A05)

CHANGES IN SCOPE OF WORKS (A06)    

CONTRACTOR’S LATE COMPLETION (A07)

VARIATION ORDER (D06)

SLOW DECISION MAKING INVOLVING ALL PARTIES (C10)

©  Dr.Sarwono  Hardjomuljadi  

FIDIC    World  Centenary  Conference  Barcelona,  Spain  September  15-­‐18,  2013  

Page 19: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

(ANALYSIS BY RELATIVE IMPORTANCE INDEX)

Factor RII D05 0.740741 B03 0.728395 A19 0.722222 A12 0.722222 D04 0.716049 A5 0.716049 A20 0.709877 A11 0.709877 A16 0.703704

DIFFERENT INTERPRETATION OF CONTRACT DOC.(D05)

SUBSURFACE CONDITIONS OF GEOLOGY (B03)

POSSESSION OF SITE AND AVAILABILITY (A19)

DESIGN ERROR AND OMMISSION (A12)

ENGINEER RESPONDENT: 27, VARIABLE: 59

©  Dr.Sarwono  Hardjomuljadi  

FIDIC    World  Centenary  Conference  Barcelona,  Spain  September  15-­‐18,  2013  

Page 20: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

CONTRACTOR RESPONDENT: 40, VARIABLE: 59 (ANALYSIS BY RELATIVE IMPORTANCE INDEX)

Factor RII A19 0.829167 A5 0.825 D04 0.8125 D02 0.808333 C07 0.804167 A6 0.8 B05 0.8 A18 0.795833 E05 0.7875 D05 0.783333 C10 0.779167 A16 0.775 D06 0.770833 A14 0.766667 B03 0.7625 D03 0.758333 D01 0.758333 A12 0.754167 C02 0.725 A17 0.716667 C03 0.7125 E06 0.708333 A15 0.704167

CHANGES IN DESIGN (A05)

UNFORESEEABLE PHYSICAL CONDITIONS (B05)

DELAYED PAYMENT ON CONTRACT AND EXTRAS (D04)

CONSTRUCTIVE CHANGE ORDER (D02)

POOR MANAGEMENT AND SUPERVISION (C07)

CHANGES IN SCOPE OF WORKS (A06)

POSSESSION OF SITE AND AVAILABILITY (A19)

PROJECT PLANNING AND INTERFACING (A18)

GOVERNMENT POLICIES (E05)

DIFFERENT INTERPRETATION OF CONTRACT DOC.(D05)

SLOW DECISION MAKING INVOLVING ALL PARTIES (C10)

ORAL CHANGES ORDER BY EMPLOYER (A16)

© Sarwono Hardjomuljadi

Page 21: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Faktor    3.1    Changes  in  Design  

Faktor    1.2    VariaEon  Order  

Faktor  1.1  ConstrucEve  Change  Order  

Faktor    2.  2  Possession  of  Site  and  Availability  

Faktor  1.3  :  Inadequate  site  invesEgaEon  

Faktor  3.2  Subsurface  condiEons  of  geology  

Faktor    3.3    Other  Contractors  Interference  and  Delay  

Faktor  3.4  Inefficiency  and  DisrupEon  

Faktor  2.1  Oral  Change  Order  by  Employer  

       KLAIM    

Page 22: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

FIDIC’s  Important  Clauses  Related  to  Claims  

Page 23: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Kuesioner dibagikan pada 20 staf pengguna jasa (termasuk penyedia jasa konsultan pengawas) dan 20 staf kontraktor yang terkait dengan pelaksanaan proyek di lingkungan Kementerian Pekerjaan Umum yang menggunakan FIDIC Conditions of Contract MDB Harmonised Edition 2006 di Indonesia, menunjukkan bahwa klausula yang paling sering digunakan oleh kontraktor sebagai dadsar pengajuan klaim adalah sebagai berikut: (Hardjomuljadi et al, 2014):

Sub-Clause 4.2 Unforeseeable physical conditions Sub-Clause 2.1. Right of Access to the Site Sub-Clause 1.9. Delayed Drawings or Instructions. Sub-Clause 13.7 Adjustment for changes in legislation Sub-Clause 8.1. Commencement of the Works

Terdapat 11 Klausula yang secara jelas menyatakan kewajiban pengguna jasa untuk memberikan perpan jangan waktu dan tambahan harga kontrak dalam FIDIC Conditions of Contract.

Page 24: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

 Other  Clauses  Related  to  Claims  

Page 25: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Sub-Clause 3.5 Determinations

Whenever these Conditions provide that the Engineer shall proceed in accordance with this Sub-Clause 3.5 to agree or determine any matter, the Engineer shall consult with each Party in an endeavour to reach agreement. If agreement is not achieved, the Engineer shall make a fair determination in accordance with the Contract, taking due regard of all relevant circumstances. The Engineer shall give notice to both Parties of each agreement or determination, with supporting particulars, within 28 days from the receipt of the corresponding claim or request except when otherwise specified. Each Party shall give effect to each agreement or determination unless and until revised under Clause 20 [Claims,Disputes and Arbitration ].

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 26: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Sub-Clause 20.1 If the Contractor considers himself to be entitled to any extension of the Time for Completion and/or any additional payment, under any Clause of these Conditions or otherwise in connection with the Contract, the Contractor shall give notice to the Engineer, describing the event or circumstance giving rise to the claim. The notice shall be given as soon as practicable, and not later than 28 days after the Contractor became aware, or should have become aware, of the event or circumstance. If the Contractor fails to give notice of a claim within such period of 28 days, the Time for Completion shall not be extended, the Contractor shall not be entitled to additional payment, and the Employer shall be discharged from all liability in connection with the claim. Otherwise, the following provisions of this Sub-Clause shall apply. The Contractor shall also submit any other notices which are required by the Contract, and supporting particulars for the claim, all as relevant to such event or circumstance. The Contractor shall keep such contemporary records as may be necessary to substantiate any claim, either on the Site or at another location acceptable to the Engineer. Without admitting the Employer’s liability, the Engineer may, after receiving any notice under this Sub-Clause, monitor the record-keeping and/or instruct the Contractor to keep further contemporary records. The Contractor shall permit the Engineer to inspect all these records, and shall (if instructed) submit copies to the Engineer.

Batasan waktu

Contemporary record

Page 27: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

     CLAIM  PROCEDURE  

Page 28: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

 14  hari  (Klausula  20.1  Para  5)  (atau jangka waktu yang diusulkan kontraktor dan disepakati oleh enjinir)

Kejadian  

28  hari  (Klausula  20.1Para  1)  

Ditolak  

42  hari  (Klausula  20.1  Para  6)  (atau jangka waktu yang diusulkan kontraktor dan disepakati oleh enjinir)

Tindakan  Enjinir  

Notifikasi  

Ya  

Detail klaim lengkap dengan data pendukung

Tidak  

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 29: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Sub-Clause 20.1 If the Contractor considers himself to be entitled to any extension of the Time for Completion and/or any additional payment, under any Clause of these Conditions or otherwise in connection with the Contract, the Contractor shall give notice to the Engineer, describing the event or circumstance giving rise to the claim. The notice shall be given as soon as practicable, and not later than 28 days after the Contractor became aware, or should have become aware, of the event or circumstance. If the Contractor fails to give notice of a claim within such period of 28 days, the Time for Completion shall not be extended, the Contractor shall not be entitled to additional payment, and the Employer shall be discharged from all liability in connection with the claim. Otherwise, the following provisions of this Sub-Clause shall apply. The Contractor shall also submit any other notices which are required by the Contract, and supporting particulars for the claim, all as relevant to such event or circumstance. The Contractor shall keep such contemporary records as may be necessary to substantiate any claim, either on the Site or at another location acceptable to the Engineer. Without admitting the Employer’s liability, the Engineer may, after receiving any notice under this Sub-Clause, monitor the record-keeping and/or instruct the Contractor to keep further contemporary records. The Contractor shall permit the Engineer to inspect all these records, and shall (if instructed) submit copies to the Engineer.

Batasan waktu

Contemporary record

Page 30: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Within 42 days after the Contractor became aware (or should have become aware) of the event or circumstance giving rise to the claim, or within such other period as may be proposed by the Contractor and approved by the Engineer, the Contractor shall send to the Engineer a fully detailed claim which includes full supporting particulars of the basis of the claim and of the extension of time and/or additional payment claimed. If the event or circumstance giving rise to the claim has a continuing effect: (a) this fully detailed claim shall be considered as interim; (b) the Contractor shall send further interim claims at monthly intervals, giving the accumulated delay and/or amount claimed, and such further particulars as the Engineer may reasonably require; and (c) the Contractor shall send a final claim within 28 days after the end of the effects resulting from the event or circumstance, or within such other period as may be proposed by the Contractor and approved by the Engineer. Within 42 days after receiving a claim or any further particulars supporting a previous claim, or within such other period as may be proposed by the Engineer and approved by the Contractor, the Engineer shall respond with approval, or with disapproval and detailed comments. He may also request any necessary further particulars, but shall nevertheless give his response on the principles of the claim within the above defined time period. Within the above defined period of 42 days, the Engineer shall proceed in accordance with Sub-Clause 3.5 [ Determinations ] to agree or determine (i) the extension (if any) of the Time for Completion (before or after its expiry) in accordance with Sub-Clause 8.4 [ Extension of Time for Completion ], and/or (ii) the additional payment (if any) to which the Contractor is entitled under the Contract.

Batasan waktu

Respon Enjinir

Page 31: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Each Payment Certificate shall include such additional payment for any claim as have been reasonably substantiated as due under the relevant provision of the Contract. Unless and until the particulars supplied are sufficient to substantiate the whole of the claim, the Contractor shall only be entitled to payment for such part of the claim as he has been able to substantiate. If the Engineer does not respond within the timeframe defined in this Clause, either Party may consider that the claim is rejected by the Engineer and any of the Parties may refer to the Dispute Board in accordance with Sub-Clause 20.4 [ Obtaining Dispute Board’s Decision ]. The requirements of this Sub-Clause are in addition to those of any other Sub-Clause which may apply to a claim. If the Contractor fails to comply with this or another Sub-Clause in relation to any claim, any extension of time and/or additional payment shall take account of the extent (if any) to which the failure has prevented or prejudiced proper investigation of the claim, unless the claim is excluded under the second paragraph of this Sub-Clause.

Pentingnya pembuktian

Mulainya DB

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 32: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

     CASES  

Page 33: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

CASE 6 “Countermeasures to overcome the delay of the river diversion” to meet the original starting date of river diversion in order to avoid further delay of plant operation.

April April October October

Original

Actual

One season delay, caused by the delay on completion of diversion tunnel operation. ©Sarwono Hardjomuljadi

Page 34: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Instruksi Enjinir diterbitkan dengan tujuan untuk penyelesaian tepat waktu dalam kaitannya dengan jadwal awal (original schedule) pelaksanaan river diversion sesudah diterbitkannya beberapa pekerjaan tambah dan adanya unforeseeable physical conditions dapat dianggap suatu perintah akselarasi.

Instruksi diberikan untuk menghindari kelambatan penyelesaian. Jadi jika kontraktor melakukan suatu usaha, tetapi akhirnya dia tetap gagal menyelesaikan pekerjaan sesuai dengan tujuan dikerbitkannya instruksi, maka pembayaran tidak bisa diterbitkan pada kontraktor.

Pendapat Kontraktor

Pendapat Enjinir :

Pendapat anda ?? :

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 35: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

KONTRAK  “LUMP  SUM”    

Seminar Nasional Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention Centre

Page 36: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Si A mengontrakkan pekerjaan pembuatan suatu proyek WC dengan kloset jongkok, karena dia berasal dari daerah pedesaan yang terbiasa menggunakan kloset jongkok. Dalam hal ini dipergunakan “lumpsum“ dengan harga kontrak IDR 10.000.000

Pada saat proyek sedang dilaksanakan, karena kondisi kesehatannya ternyata si A tidak dapat menggunakan kloset jongkok, sehingga diperlukan perubahan kloset jongkok menjadi kloset duduk.

CONTOH SEDERHANA:

Dapatkah proyek “lumpsum” ini diubah? Dalam kontrak disebutkan: “Proyek bersifat lumpsum, semua resiko menjadi tanggung jawab penyedia jasa”.

Beberapa pasal dalam kontrak yang harus ada dan tidak boleh dihilangkan (meskipun pada kontrak lumpsum): 1. Variation (Variasi) 2. Unforeseen condition (Kejadian tak terduga sebelumnya) 3. Force Majeure (Keadaan kahar)

FIDIC Conditions of Contract

Page 37: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Contoh pertama, sangat sederhana adalah pembangunan suatu WC dengankontrak lump sum menggunakan kloset jongkok, yang kaena kondisi kesehatan pengguna jasa, terpaksa harus diubah menjadi kloset duduk.

Kloset duduk jelas harus dibeli dan memerlukan tambahan biaya pengadaan kloset duduk yang merupakan barang produksi pabrik.

Pihak PPK akan merujuk pada ketentuan yang biasanya akan disampaikan pada saat aanwijzing, bahwa “Kontrak bersifat lump sum, semua resiko menjadi tanggung jawab penyedia jasa”, sehingga meskipun diketahuinya bahwa perubahan menjadi kloset duduk memerlukan tambahan biaya pengadaan di pihak kontraktor, dia akan berkeras berpegang pada ketentuan di atas.

Di sinilah diperlukan pemahaman legal dan pemahaman akan suatu perjanjian, karena perjanjian kontrak lump sum ini dibuat dengan kondisi dan persyaratan/spesifikasi seperti yang diperjanjikan pada awalnya. Jika terjadi perubahan persyaratan/spesifikasi yang ditentukan oleh pengguna jasa atau merupakan suatu peruintah perubahan, maka apa yang diperjanjikan menjadi berubah dengan konsekwensi terjadinya perubahan lingkup perjanjian yang berarti sifat ‘lumpsum yang diperjanjikan pada saat awal telah berubah.

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 38: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

YANG  TERSURAT  ??  YANG  TERSIRAT  ??  

Seminar Nasional Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention Centre

Page 39: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Contoh kedua, pentingnya pemahaman hukum: Perpres No 54 Tahun 2010 Pasal 51 menyebutkan beberapa Jenis Kontrak: (1)  Kontrak Lump sum merupakan Kontrak Pengadaan Barang/Jasa ........ (2)  Kontrak Harga Satuan merupakan Kontrak Pengadaan Barang/Jasa.. (3)  Kontrak gabungan Lump Sum dan Harga Satuan adalah Kontrak yang merupakan gabungan Lump Sum dan Harga Satuan (4)  Kontrak Persentase merupakan Kontrak Pengadaan Jasa Konsultansi/Jasa Lainnya, dan (5)  Kontrak Terima Jadi (Turnkey) merupakan Kontrak Pengadaan Barang/Pekerjaan Konstruksi/Jasa Lainnya.

Dari kelima jenis kontrak, hanya (5) Kontrak Terima Jadi yang menyebutkan Pekerjaan Konstruksi, yang lain sama sekali tidak menyebutnya. Apakah ini berarti untuk Pekerjaan Konstruksi, diwajibkan untuk menggunakan kontrak jenis ini? Stakeholder Jasa Konstruksi umumnya tidak menaruh perhatian akan hal ini, namun demikian jika suatu saat berproses di pengadilan, bukan tidak mungkin hakim akan mempermasalahkan hal ini.

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 40: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

KONTRAK  UNILATERAL    

Seminar Nasional Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention Centre

Page 41: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Contoh ketiga, perlunya pemahaman , ketelitian dn interpretasi kontrak yang benar. Pasal 92 (1). c. penyesuaian harga tidak diberlakukan terhadap Kontrak Tahun Tunggal dan Kontrak Lump Sum serta pekerjaan dengan Harga Satuan timpang. (2) Persyaratan penggunaan rumusan penyesuaian harga adalah sebagai berikut:…. f. Kontrak yang terlambat pelaksanaannya disebabkan oleh kesalahan Penyedia barang/Jasa diberlakukan penyesuaian harga berdasarkan indeks harga terendah antara jadwal awal dengan jadwal realisasi pekerjaan. Pasal 92 di atas mengatur mengenai kontrak lump sum (1).c tanpa penyesuaian harga,sedangkan dalam (2).f disebutkan dapat disesuaikan apabila Penyedia Jasa melakukan kesalahan. Pasal ini tidak mengatur mengenai kesalahan yang dilakukan oleh pengguna jasa.

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 42: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Dalam menginterpretasikan suatu kontrak diperlukan suatu kemampuan menginterpretasi khusus, seperti dilihat pada klausula di bawah ini. FIDIC Conditions of Contract for Construction MDB Harmonised Edition-2006) b) payment of any such Cost, which “shall be included in” the Contract Price, in the case of sub-paragraph (f) and (g) of Sub-Clause 17.3 [Employer’s Risk],” reasonable profit on the Cost shall also be included”. FIDIC Conditions of Contract for EPC/Turnkey Project-1999) b) payment of any such Cost, which “shall be added to” the Contract Price. Dari kedua pasal di atas, jelas bahwa dalam hal terdapat tambahan biaya pada kontrak harga satuan, tambahan harga sebesar Y harus “dimasukkan” dalam harga kontrak, berarti harga kontrak yang semula pada batas atas X akan naik menjadi Z = X+Y. Sedangkan pada kontrak lump sum tambahan harga Y akan “ditambahkan”, sehingga harga final menjadi X+Y juga, hanya permasalahan administrasinya saja yang berbeda.

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF (ADR), ACIArb, (Arb) A CPE. (Eng)

FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia

Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected]

www.sarwonohm.com

Page 43: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Klaim Konstruksi pada Proyek Institusi Pemerintah Pasal 13 PPK dilarang mengadakan ikatan perjanjian atau menandatangani Kontrak dengan Penyedia Barang/Jasa apabila belum tersedia anggaran atau tidak cukup tersedia anggaran yang dapat mengakibatkan dilampauinya batas anggaran yang tersedia untuk kegiatan yang dibiayai dari APBN/APBD. Hal ini membuat penyelesaian klaim menjadi sulit, karena untuk memutuskan bahwa suatu klaim disetujui berarti menyanggupi untuk membayar suatu nilai tertentu, sedangkan dalam Pasal 13 disebutkan bahwa sebelum adanya anggaran maka PPK dilarang membuat ikatan atau menandatangani kontrak.

Page 44: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Pasal 51 (1) Kontrak Lump Sum merupakan Kontrak Pengadaan Barang/Jasa atas penyelesaian

seluruh pekerjaan dalam batas waktu tertentu sebagaimana ditetapkan dalam Kontrak, dengan ketentuan sebagai berikut:

a . jumlah harga pasti dan tetap serta tidak dimungkinkan penyesuaian harga; b. semua risiko sepenuhnya ditanggung oleh Penyedia Barang/Jasa; c. pembayaran didasarkan pada tahapan produk/keluaran yang dihasilkan sesuai

dengan isi Kontrak; d. sifat pekerjaan berorientasi kepada keluaran (output based); e. total harga penawaran bersifat mengikat; dan f. tidak diperbolehkan adanya pekerjaan tambah/kurang.

Proses Klaim konstruksi utamanya bagi pekerjaan dengan kontrak lump sum, menjadi sulit, karena PPK tidak berani memutuskan, karena bayang-bayang “menguntungkan orang lain”, yang bisa membawanya ke ranah pidana. Pemahaman arti dari kontrak lump sum secara legal, masih kurang dimiliki oleh para PPK dan bahkan institusi pemeriksa.

Page 45: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

Country Representative for Indonesia The Dispute Resolution Board Foundation

19550 International Blvd. So Suite 314 Seattle, Washington 98188, USA

Tel.(206) 878-3336, Fax (206) 878-3338 www.drb.org

Corporate Panel Member (MDBF) The Dispute Board Federation

14, rue du Rhone 1204 Geneva, Switzerland

Tel: +41 22 819 19 68, Fax: +41 44 732 69 95 www.dbfederation.org

Associate Member (ACIArb) Chartered Institute of Arbitrators

12 Bloomsbury Square London, WC1A 2LP, UK

Tel: +44 (0)20 7421 7444; Fax: +44 (0)20 7404 4023 www.ciarb.org

FIDIC International Accredited Trainer FIDIC Adjudicator

Federation Internationale des Ingenieurs-Conseils FIDIC - Box 311 - CH-1215 Geneva 15 - Switzerland

SKYPE fidic.secretariat - Tl +41-22-799 49 00 - Fx +41-22-799 49 01 www.FIDIC.org

Sarwono  Hardjomuljadi  Dr,  Ir,  MSc  (Civ),  MSBA  (Bus),    MH  (Law),  MDBF  (ADR),  ACIArb  (Arb),  ACPE  (Eng)    

Page 46: PERMASALAHAN KLAIM KONSTRUKSI DI PROYEK …bpkonstruksi.pu.go.id/seminar/3. 2014 Sarwono Bapekon Sessi Pagi... · Manajemen Klaim Proyek Konstruksi 6 November 2014 Jakarta Convention

TERIMA  KASIH  

Sarwono Hardjomuljadi Dr, Ir, MSC (Civ), MSBA (Bus), MH (Law), MDBF, ACIArb, ACPE. FIDIC Affiliate Member , FIDIC Accredited Trainer, FIDIC Adjudicator DRBF Country Representative for Indonesia Vice Chairman, Indonesia National Board for Construction Services Development [email protected] & [email protected] www.sarwonohm.com