PERANCANGAN MODEL SIMULASI JALUR EVAKUASI · PDF fileperpustakaan.uns.ac.id digilib.uns.ac.id...
Transcript of PERANCANGAN MODEL SIMULASI JALUR EVAKUASI · PDF fileperpustakaan.uns.ac.id digilib.uns.ac.id...
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
PERANCANGAN MODEL SIMULASI JALUR EVAKUASI
(Studi Kasus : RSUD dr. R. Goeteng Taroenadibrata)
Skripsi
DIAN FITRIANA PURWANINGSIH
I0308021
JURUSAN TEKNIK INDUSTRI FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA
2013
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
iii
SURAT PERNYATAAN
ORISINALITAS KARYA ILMIAH
Saya mahasiswa Jurusan Teknik Industri Fakultas Teknik UNS yang bertanda
tangan dibawah ini:
Nama : Dian Fitriana Purwaningsih
NIM : I 0308021
Judul TA : Perancangan Model Simulasi Jalur Evakuasi (Studi Kasus: RSUD
dr. R. Goeteng Taroenadibrata)
Dengan ini saya menyatakan bahwa Tugas Akhir (TA) atau Skripsi yang saya
susun tidak mencontoh atau melakukan plagiat dari karya tulis orang lain. Jika
terbukti Tugas Akhir yang saya susun mencontoh atau melakukan plagiat dari
karya orang lain maka Tugas Akhir yang saya susun dapat dinyatakan batal dan
gelar Sarjana yang saya peroleh dengan sendirinya dibatalkan atau dicabut.
Demikian surat pernyataan ini saya buat dengan sebenarnya dan apabila di
kemudian hari terbukti melakukan kebohongan maka saya sanggup menanggung
segala konsekuensinya.
Surakarta, 7 Mei 2013
Dian Fitriana Purwaningsih
I 0308021
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
iv
SURAT PERNYATAAN
PUBLIKASI KARYA ILMIAH
Saya mahasiswa Jurusan Teknik Industri Fakultas Teknik UNS yang bertanda
tangan dibawah ini:
Nama : Dian Fitriana Purwaningsih
NIM : I 0308021
Judul TA : Perancangan Model Simulasi Jalur Evakuasi (Studi Kasus: RSUD dr.
R. Goeteng Taroenadibrata)
Menyatakan bahwa Tugas Akhir (TA) atau Skripsi yang saya susun sebagai syarat
lulus Sarjana S1 disusun secara bersama-sama dengan Pembimbing 1 dan
Pembimbing 2. Bersamaan dengan syarat pernyataan ini bahwa hasil penelitian
dari Tugas Akhir (TA) atau Skripsi yang saya susun bersedia digunakan untuk
publikasi dari prooceding, jurnal, atau media penerbit lainnya baik di tingkat
nasional maupun internasional sebagaimana mestinya yang merupakan bagian
dari publikasi karya ilmiah.
Demikian surat pernyataan ini saya buat dengan sebenar-benarnya.
Surakarta, 7 Mei 2013
Dian Fitriana Purwaningsih
I 0308021
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
v
KATA PENGANTAR
Segala Puji dan Syukur penulis panjatkan kehadirat Tuhan Yang Maha
Esa atas rahmat dan lindungan-Nya sehingga penulis dapat menyelesaikan
skripsi ini. Dalam menyelesaikan skripsi ini, penulis banyak menerima
bimbingan, arahan, bantuan dan motivasi dari berbagai pihak. Pada
kesempatan ini penulis ingin mengucapkan banyak terima kasih kepada :
1. Bapak Dr Cucuk Nur Rosyidi, S.T., M.T., selaku Ketua Jurusan Teknik
Industri UNS.
2. Bapak Irwan Iftadi, S.T., M.Eng., dan Bapak Wakhid Ahmad Jauhari,
S.T., MT yang telah memberikan bimbingan dan arahan dalam
penyusunan skripsi ini.
3. Ibu Rahmaniyah Dwi Astuti, S.T., M.T. dan Bapak Pringgo Widyo
Laksono, S.T., M.T. selaku dosen penguji yang berkenan memberikan
saran, masukan dan perbaikan terhadap skripsi ini.
4. Bapak dan Ibu tercinta yang telah memberikan kasih sayang, doa, dan
dukungannya
5. Para staff dan karyawan Jurusan Teknik Industri, atas segala kesabaran
dan pengertiannya dalam memberikan bantuan dan fasilitas demi
kelancaran penyelesaian skripsi ini.
6. Teman-teman mahasiswa Teknik Industri 2008 yang telah bersama-sama
menyelesaikan studi strata S1.
7. Teman-teman kos Bu Djaman dan kos Azzahri atas segala kebersamaan
dan dukungannya.
8. Seluruh pihak-pihak yang tidak dapat penulis sebutkan satu persatu, atas
segala bimbingan, bantuan, kritik, dan saran dalam penyusunan tugas
akhir ini.
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
vi
Semoga skripsi ini dapat bermanfaat bagi rekan-rekan mahasiswa
maupun siapa saja yang membutuhkannya. Penulis menyadari bahwa skripsi
ini masih jauh dari sempurna, dengan senang hati dan terbuka penulis
menerima segala saran dan kritik yang membangun.
Surakarta, 7 Mei 2013
Penulis
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
vii
ABSTRAK
Dian Fitriana Purwaningsih, I0308021, 2008. PERANCANGAN MODEL
SIMULASI JALUR EVAKUASI (STUDI KASUS: RSUD dr. R. GOETENG
TAROENADIBRATA). Skripsi. Surakarta: Jurusan Teknik Industri,
Fakultas Teknik, Universitas Sebelas Maret, Mei 2013.
Evakuasi merupakan tindakan penting sebagai upaya tanggap darurat
bencana di rumah sakit. Lama waktu evakuasi sangat berpengaruh terhadap
tingkat keberhasilan evakuasi. Semakin kecil waktu evakuasi, maka semakin
besar jumlah orang yang selamat dari bencana dan sebaliknya. Waktu evakuasi
terdiri dari 4 unsur yaitu detection time, notification time, premovement time, dan
movement time. Berdasarkan 4 unsur tersebut movement time memiliki prosentase
terbesar dari keseluruhan waktu evakuasi. Penelitian ini bertujuan untuk
mendapatkan suatu model simulasi jalur evakuasi dan menentukan skenario
terbaik berdasarkan skenario yang dikembangkan. Terdapat 8 tahap dalam perancangan model simulasi jalur evakuasi. Tahap
pertama adalah penentuan occupant load factor. Penentuan occupant load factor
dilakukan dengan mempertimbangkan karakteristik penggunaan ruang. Tahap
kedua adalah penentuan blok layout bangunan. Penentuan blok layout bangunan
merupakan suatu penyederhanaan layout bangunan karena keterbatasan jumlah
modul dan jumlah entitas dalam software. Tahap ketiga adalah penentuan node.
Penentuan node dilakukan sesuai dengan arah jalur evakuasi yang ditetapkan.
Terdapat 3 jenis node yaitu node source yang terletak di masing-masing blok,
node exit yang terletak pada sisi blok, dan node pertemuan jika terdapat
pertemuan orang. Tahap keempat adalah perhitungan luas area. Perhitungan luas
area dengan mempertimbangkan kriteria net atau gross area berdasarkan occupant
load factor. Tahap kelima adalah penentuan occupant load. Besarnya occupant
load menjadi input simulasi sebagai suatu entitas yang bergerak. Tahap keenam
adalah pengembangan skenario jalur evakuasi. Skenario yang diujicobakan
merupakan beberapa alternatif solusi jalur evakuasi yang diusulkan. Skenario-
skenario tersebut meliputi pembongkaran dinding, penambahan pintu dan jalur
sebagai jalur evakuasi. Tahap ketujuh adalah perhitungan movement time.
Movement time dihitung berdasarkan besarnya travell time atau flow time. Tahap
kedelapan adalah simulasi. Simulasi dilakukan dengan menggunakan software
Rockwell Arena.
Hasil dari penelitian ini adalah mendapatkan model simulasi jalur
evakuasi dan terpilihnya skenario 1 sebagai skenario terbaik. Dalam skenario ini
terjadi pengurangan waktu maksimum movement time sebesar 33.34 detik jika
dibandingkan dengan kondisi aktual.
Kata kunci: waktu evakuasi, movement time, simulasi, occupant load factor
viii + 57 halaman; 46 tabel; 29 gambar; 1 lampiran; Daftar pustaka: 24 (2000-
2012)
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
viii
ABSTRACT
Dian Fitriana Purwaningsih, I0308021, 2008. DESIGN OF SIMULATION
MODEL FOR EVACUATION ROUTE (CASE STUDY : RSUD dr. R.
GOETENG TAROENADIBRATA). Thesis. Surakarta: Industrial
Engineering, Faculty of Engineering, Sebelas Maret University, May 2013.
Evacuation is an important action as an emergency response effort in the
hospital. The evacuation long time greatly affects the success of evacuation. If the
smaller the evacuation time takes, it will have the greater number of people who
survived the disaster, and otherwise. Evacuation time consists of four elements,
namely detection time, notification time, premovement time, and movement time.
Based on the 4 elements, movement time has the greatest percentage of the overall
evacuation time. This study is aimed to obtain a simulation model of evacuation
routes and determines the best scenario based on the developed scenarios.
There are eight steps in model simulation design of evacuation route. The
first stage is determination of occupant load factor. It is carried out by taking into
the characteristic of space use. The second stage is determination of the layout
block of building. It is a simplified layout of building because of the limited
number of modules and entities on software. The third stage is determination of
node. It is made in accordance with the specified evacuation route direction. There
are 3 types of node which are source node located in each block, exit node located
in the side of the block, and merge node if there are merging flow. The fourth
stage is calculation of area. It is considered by net or gross criteria based on
occupant load factor. The fifth stage is determination of occupant load. The
number of occupant load become the simulation input as the moving entities. The
sixth stage is development of evacuation route scenario. The tested scenario is as
some solution alternatives of proposed evacuation route. The scenarios include
demolishing the walls, adding doors and pathways as evacuation routes. The
seventh stage is calculation of movement time. It is calculated based on amount of
travel time or flow time. The eighth stage is simulation. Simulation is performed
using Rockwell Arena Software.
The result of this study is to get an evacuation route of simulation model
and get scenario 1 as the best scenario. In this scenario, there is a reduction in the
maximum time of movement time which is 33.34 seconds compared with the
actual conditions.
Key words: evacuation time, movement time, simulation, occupant load factor
ix + 57 pages; 46 tables; 29 pictures; 1 appendixes; Bibliography: 24 (2000-2012)
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
ix
DAFTAR ISI
Hal
HALAMAN JUDUL i
LEMBAR PENGESAHAN ii
SURAT PERNYATAAN ORISINALITAS KARYA ILMIAH iii
SURAT PERNYATAAN PUBLIKASI KARYA ILMIAH iv
KATA PENGANTAR v
ABSTRAK vii
ABSTRACT viii
DAFTAR ISI ix
DAFTAR TABEL xii
DAFTAR GAMBAR xv
BAB 1 PENDAHULUAN I-1
1.1 Latar Belakang Masalah I-1
1.2 Perumusan Masalah I-3
1.3 Tujuan Penelitian I-3
1.4 Manfaat Penelitian I-3
1.5 Batasan Masalah I-4
1.6 Asumsi I-4
1.7 Sistematika Penulisan I-4
BAB II TINJAUAN PUSTAKA II-1
2.1 Profil RSUD dr. R. Goeteng Taroenadibrata II-1
2.1.1 Sejarah RSUD dr. R. Goeteng Taroenadibrata II-1
2.1.2 Visi, Misi, dan Motto dr. R. Goeteng
Taroenadibrata II-1
2.1.3 Pelayanan II-2
2.2 Bencana II-2
2.2.1 Definisi II-2
2.2.2 Jenis Ancaman Bencana II-3
2.3 Konsep Penanggulangan Bencana II-3
2.3.1 Penyelenggaraan Penanggulangan Bencana II-3
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
x
2.3.2 Perencanaan dalam Penyelenggaraan
Penanggulangan Bencana II-4
2.4 Sarana Penyelamatan atau Evakuasi II-5
2.5 Perhitungan Waktu Evakuasi II-5
2.5.1 Penentuan Occupant Load Factor (Faktor
Kepadatan) II-5
2.5.2 Menentukan Net atau Gross Area II-9
2.5.3 Perhitungan Jumlah Orang (Occupant Load) II-10
2.5.4 Required Safe Egress Time (RSET) II-10
2.6 Simulasi II-16
BAB III METODOLOGI PENELITIAN III-1
3.1 Studi Lapangan dan Studi Pustaka III-2
3.2 Penentuan Objek Penelitian III-2
3.3 Latar Belakang Masalah III-2
3.4 Perumusan Masalah III-3
3.5 Tujuan dan Manfaat Penelitian III-3
3.6 Pengumpulan Data III-3
3.7 Metode Pengolahan Data III-3
3.8 Analisis dan Interpretasi Data III-6
3.9 Kesimpulan dan Saran III-6
BAB IV PENGUMPULAN DAN PENGOLAHAN DATA IV-1
4.1 Jalur Evakuasi RSUD dr. R. Goeteng Taroenadibrata IV-1
4.2 Penentuan Occupant Load Factor (Faktor Kepadatan) IV-1
4.3 Penentuan Blok Layout Bangunan dan Node IV-3
4.4 Perhitungan Luas Area (Net atau Gross Area) dan
Jumlah Orang (Occupant Load) IV-5
4.5 Perhitungan Movement Time IV-7
4.5.1 Perhitungan Panjang dan Lebar Blok IV-8
4.5.2 Perhitungan Jarak antar Node IV-8
4.5.3 Perhitungan Travell Time atau Flow Time IV-10
4.5.4 Pengembangan Skenario Jalur Evakuasi IV-19
4.5.5 Simulasi IV-20
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xi
BAB V ANALISIS DAN INTERPRETASI DATA V-1
5.1 Pengaruh Penentuan Blok Layout Bangunan V-1
5.2 Perbandingan Kondisi Aktual, Skenario 1, Skenario 2,
dan Skenario 3 V-1
BAB VI KESIMPULAN DAN SARAN VI-1
6.1 Kesimpulan VI-1
6.2 Saran VI-1
DAFTAR PUSTAKA
LAMPIRAN
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xii
DAFTAR TABEL
Hal
Tabel 2.1 Occupant Load Factor (Faktor Kepadatan) II-6
Tabel 2.2 Konstanta Kecepatan Evakuasi II-11
Tabel 2.3 Boundary Layer II-13
Tabel 4.1 Rekapitulasi Occupant Load Factor di Ruang Gardena
Baru IV-3
Tabel 4.2 Rekapitulasi Luas Area dan Jumlah Orang di Ruang
Gardena Baru IV-6
Tabel 4.3 Rekapitulasi Panjang dan Lebar Ruang atau Blok di
Ruang Gardena Baru IV-8
Tabel 4.4 Rekapitulasi Jarak antar Node di Ruang Gardena Baru IV-8
Tabel 4.5 Output Simulasi Masing-masing Bangunan (Kondisi
Aktual) IV-20
Tabel 4.6 Output Simulasi di Ruang Gardena Baru dan Gardena
Lama (Skenario 1) IV-21
Tabel 4.7 Output Simulasi IBS dan ICCU (Skenario 2) IV-21
Tabel 4.8 Output Simulasi IBS dan ICCU (Skenario 3) IV-22
Tabel 4.9 Output Simulasi Total Movement Time Menuju Zona II
Melalui Koridor Blok 29 (Kondisi Aktual) IV-22
Tabel 4.10 Output Simulasi Total Movement Time Menuju Zona II
Melalui Koridor Blok 30 (Kondisi Aktual) IV-22
Tabel 4.11 Output Simulasi Total Movement Time Menuju Zona II
Melalui Koridor Blok 29 (Skenario 1) IV-23
Tabel 4.12 Output Simulasi Total Movement Time Menuju Zona II
Melalui Koridor Blok 29 (Skenario 2) IV-23
Tabel 4.13 Output Simulasi Total Movement Time Menuju Zona II
Melalui Koridor Blok 30 (Skenario 2) IV-24
Tabel 4.14 Output Simulasi Total Movement Time Menuju Zona II
Melalui Koridor Blok 30 (Skenario 3) IV-25
Tabel 4.15 Movement Time Maksimum Menuju Zona II Melalui
Koridor Blok 29 IV-25
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xiii
Tabel 4.16 Movement Time Maksimum Menuju Zona II Melalui
Koridor Blok 30 IV-26
Tabel L1.1 Rekapitulasi Occupant Load Factor di Ruang Gardena
Lama L-1
Tabel L1.2 Rekapitulasi Occupant Load Factor di Ruang Ruang
Mawar dan Melati L-1
Tabel L1.3 Rekapitulasi Occupant Load Factor di Ruang Flamboyan L-1
Tabel L1.4 Rekapitulasi Occupant Load Factor di Ruang Edelweis L-2
Tabel L1.5 Rekapitulasi Occupant Load Factor di Koridor L-2
Tabel L2.1 Rekapitulasi Luas Area dan Jumlah Orang L-3
Tabel L3.1 Rekapitulasi Panjang dan Lebar Blok atau Ruang L-4
Tabel L4.1 Rekapitulasi Jarak antar Node Kondisi Aktual L-5
Tabel L4.2 Rekapitulasi Jarak antar Node Skenario 1 L-7
Tabel L4.3 Rekapitulasi Jarak antar Node Skenario 2 L-8
Tabel L4.4 Rekapitulasi Jarak antar Node Skenario 3 L-8
Tabel L5.1 Rekapitulasi Movement Time Kondisi Aktual L-9
Tabel L5.2 Rekapitulasi Movement Time Skenario 1 L-17
Tabel L5.3 Rekapitulasi Movement Time Skenario 2 L-18
Tabel L5.4 Rekapitulasi Movement Time Skenario 3 L-20
Tabel L6.1 Rekapitulasi Occupant Load Factor Gabungan dan
Transisi Kondisi Aktual L-22
Tabel L6.2 Rekapitulasi Occupant Load Factor Gabungan dan
Transisi Skenario 1 L-25
Tabel L6.3 Rekapitulasi Occupant Load Factor Gabungan dan
Transisi Skenario 2 L-26
Tabel L6.4 Rekapitulasi Occupant Load Factor Gabungan dan
Transisi Skenario 3 L-28
Tabel L7.1 Rekapitulasi Rata-rata Kecepatan (Speed) di Ruang
Gardena Baru Kondisi Aktual. L-29
Tabel L7.2 Rekapitulasi Rata-rata Kecepatan (Speed) di Ruang
Edelweis Kondisi Aktual L-30
L-44
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xiv
Tabel L7.3 Rekapitulasi Rata-rata Kecepatan (Speed) di Koridor
Kondisi Aktual L-30
Tabel L7.4 Rekapitulasi Rata-rata Kecepatan (Speed) di Ruang
Gardena Baru Lantai 1 Skenario 1 L-32
Tabel L7.5 Rekapitulasi Rata-rata Kecepatan (Speed) di Koridor
Blok 29 Skenario 1 L-32
Tabel L7.6 Rekapitulasi Rata-rata Kecepatan (Speed) di Koridor
Skenario 2 L-33
Tabel L7.7 Rekapitulasi Rata-rata Kecepatan (Speed) di IBS dan
ICCU Skenario 3 L-34
Tabel L7.8 Rekapitulasi Rata-rata Kecepatan (Speed) di Koridor
Blok 30 Skenario 3 L-34
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xv
DAFTAR GAMBAR
Hal
Gambar 2.1 Siklus Penanggulangan Bencana II-3
Gambar 2.2 Rencana Penanggulangan Bencana II-5
Gambar 2.3 Hubungan antara Kepadatan dan Kecepatan (Speed) II-12
Gambar 2.4 Hubungan antara Specific Flow dan Kepadatan II-13
Gambar 2.5. Lebar Efektif II-14
Gambar 2.6 Penggabungan Flow II-15
Gambar 2.7 Transisi Flow II-15
Gambar 3.1 Flowchart Metodologi III-1
Gambar 4.1 Jalur dan Zona Evakuasi RSUD dr. R. Goeteng
Taroenadibrata IV-1
Gambar 4.2 Riser dan Tread IV-9
Gambar 4.3 Bordes IV-10
Gambar L8.1 Arah Evakuasi Kondisi Aktual L-36
Gambar L8.2 Blok, Node, dan Lintasan Ruang Gardena Baru Lantai
3 L-37
Gambar L8.3 Blok, Node, dan Lintasan Ruang Gardena Baru Lantai
2 L-38
Gambar L8.4 Blok, Node, dan Lintasan di Ruang Gardena Baru
Lantai 1 L-39
Gambar L8.5 Blok, Node, dan Lintasan di Ruang Gardena Lama L-40
Gambar L8.6 Blok, Node, dan Lintasan di Ruang Mawar dan Melati L-40
Gambar L8.7 Blok, Node, dan Lintasan di Ruang Flamboyan dan
Ruang Edelweis L-41
Gambar L8.8 Blok, Node, dan Lintasan di Koridor Blok 29 Menuju
Zona II L-42
Gambar L8.9 Blok, Node, dan Lintasan di Koridor Blok 30 Menuju
Zona II L-43
Gambar L8.10 Arah Evakuasi Skenario 1 L-44
Gambar L8.11 Node dan Lintasan di Ruang Gardena Baru dan Ruang
Gardena Lama Skenario 1 L-45
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xvi
Gambar L8.12 Arah Evakuasi Skenario 2 L-46
Gambar L8.13 Node dan Lintasan Blok 17, 20, dan 23 di IBS dan
ICCU Skenario 2 L-47
Gambar L8.14 Arah Evakuasi Skenario 3 L-48
Gambar L8.15 Node dan Lintasan Blok 17 dan 18 di IBS dan ICCU
Skenario 3 L-49
Gambar L9.1 Simulasi Ruang Gardena Baru Lantai 3 ke Lantai 2 –
Node FR L-50
Gambar L9.2 Simulasi Ruang Gardena Baru Lantai 2 ke Lantai 1 –
Node DA L-51
Gambar L9.3 Simulasi Ruang Gardena Baru Lantai 1 – Node CY,
Node CQ L-52