PERANCANGAN KAPAL GENERAL CARGO 11850 DWT …repository.upnvj.ac.id/3559/4/AWAL.pdf · Data kapal...

13
PERANCANGAN KAPAL GENERAL CARGO 11850 DWT KECEPATAN 12 KNOT DENGAN RUTE SURABAYA JAKARTA SKRIPSI TAUFIK ISMAIL 1310313016 UNIVERSITAS PEMBANGUNAN NASIONAL “VETERAN” JAKARTA FAKULTAS TEKNIK PROGRAM STUDI TEKNIK PERKAPALAN 2017

Transcript of PERANCANGAN KAPAL GENERAL CARGO 11850 DWT …repository.upnvj.ac.id/3559/4/AWAL.pdf · Data kapal...

  • PERANCANGAN KAPAL GENERAL CARGO

    11850 DWT KECEPATAN 12 KNOT

    DENGAN RUTE SURABAYA – JAKARTA

    SKRIPSI

    TAUFIK ISMAIL

    1310313016

    UNIVERSITAS PEMBANGUNAN NASIONAL “VETERAN” JAKARTA

    FAKULTAS TEKNIK

    PROGRAM STUDI TEKNIK PERKAPALAN

    2017

  • i

    PERANCANGAN KAPAL GENERAL CARGO

    11850 DWT KECEPATAN 12 KNOT

    DENGAN RUTE SURABAYA – JAKARTA

    SKRIPSI

    Diajukan Sebagai Salah Satu Syarat Untuk Memperoleh Gelar

    Sarjana Teknik

    TAUFIK ISMAIL

    1310313016

    UNIVERSITAS PEMBANGUNAN NASIONAL “VETERAN” JAKARTA

    FAKULTAS TEKNIK

    PROGRAM STUDI TEKNIK PERKAPALAN

    2017

  • v

    PERANCANGAN KAPAL GENERAL CARGO

    11850 DWT KECEPATAN 12 KNOT

    DENGAN RUTE SURABAYA - JAKARTA

    Taufik Ismail

    Abstrak

    Kapal general cargo adalah kapal yang mengangkut bermacam-macam muatan

    berupa barang.Barang yang diangkut biasanya merupakan barang yang sudah

    dikemas. Kapal general cargo dilengkapi dengan crane pengangkut barang untuk

    memudahkan bongkar-muat muatan. Ukuran utama kapal didapatkan dengan

    menggunakan metode regresi, penulis mengambil data sampel sebanyak 30 buah

    kapal yang di dapat dari BKI Register 1996 dan BKI Register 2006 dalam langkah

    mencari ukuran pokok kapal. Di dalam skripsi ini penulis mendesain kapal

    general cargo dengan kecepatan dinas (Service Speed) 12 Knot dengan rute

    Surabaya – Jakarta. Data kapal dapat di lihat pada Bab 3 dan berikut adalah

    ukuran pokok kapal yang telah ditentukan LOA : 132,46 m , Lpp : 123,78 m , B :

    19,23 m , H: 10,51 m , T : 8,17 m.

    Kata Kunci : Kapal general cargo , regresi, Rute

  • vi

    THE 11850 DWT GENERAL CARGO VESSEL DESIGN

    SERVICE SPEED 12 KNOTS

    WITH ROUTE SURABAYA – JAKARTA

    Taufik Ismail

    Abstract

    General cargo vessel is a ship carrying an assortment of cargo in the form of

    goods. Goods are transported are usually the goods already packed. General

    cargo ship is equipped with a crane transporting goods to facilitate loading and

    unloading of cargo. The main size of the vessel obtained by using regression

    method, authors take as many as 30 pieces of sample data obtained from the ship

    BKI Register 1996 and 2006 in steps of searching for the basic size of the vessel.

    In this paper the author designed the general cargo ship with a speed of service

    (Service Speed) 12 Knots route Surabaya – Jakarta. Data of the ships can be seen

    in Chapter 3 and the following are the principal measure predetermined vessel

    LOA : 132,46 m , Lpp : 123,78 m , B : 19,23 m , H : 10,51 m , T : 8,17 m .

    Keywords: General Cargo Vessel, Regression, Route

  • vii

    KATA PENGANTAR

    Puji syukur kepada Allah SWT berkat Rahmat, Hidayah, dan Karunia-Nya

    sehingga penulis dapat menyelesaikan proposal skripsi dengan judul

    “PERANCANGAN KAPAL GENERAL CARGO 11850 DWT DENGAN RUTE

    PELAYARAN SURABAYA - JAKARTA” skripsi ini disusun sebagai salah satu

    syarat untuk mengerjakan skripsi pada program Strata-1 di Jurusan Teknik

    Perkapalan, Fakultas Teknik, Universtias Pembangunan Nasional “Veteran”

    Jakarta.

    Disamping itu, ucapan terima kasih juga disampaikan kepada Papah,

    Mamah, Kakak, Adik dan Keponakan yang tidak henti-hentinya memberikan

    penulis semangat dan doa. Terima kasih pula untuk kedua pembimbing saya Ibu

    Wiwin Sulistyawati ST,MT dan Bapak Joko Suranto ST,MT yang telah

    membimbing penulis untuk menyelesaikan skripsi ini, dan juga kepada dosen

    Teknik Perkapalan umum nya yang tidak bisa di sebutkan satu persatu.

    Penulis juga sampaikan terima kasih banyak kepada Mahasiswa dan

    Mahasiswi ITS, UI dan UNDIP yang telah membantu dan selalu memberi

    dukungan dalam penulisan Skripsi perancangan kapal ini.Yang terakhir penulis

    ucapkan terima kasih kepada para sahabat-sahabat yang tidak bisa di sebutkan

    satu persatu,mereka lah yang tidak pernah berhenti memberikan semangat dan

    menghibur penulis dalam menyelesaikan skripsi ini.

    Jakarta, 11 Mei 2017

    Taufik Ismail

  • viii

    DAFTAR ISI

    HALAMAN JUDUL .................................................................................... i

    PERNYATAAN ORISINALITAS .............................................................. ii

    PERNYATAAN PERSETUJUAN PUBLIKASI ....................................... iii

    PENGESAHAN ............................................................................................ iv

    ABSTRAK .................................................................................................... v

    ABSTRACT .................................................................................................. vi

    KATA PENGANTAR .................................................................................. vii

    DAFTAR ISI ................................................................................................. viii

    DAFTAR TABEL ........................................................................................ x

    DAFTAR GAMBAR .................................................................................... xi

    DAFTAR LAMPIRAN ................................................................................ xii

    BAB I PENDAHULUAN

    I.1 Latar Belakang Penulisan ......................................................................... 1

    I.2 Rumusan Masalah ..................................................................................... 2

    I.3 Maksud Dan Tujuan Pemilihan Judul ....................................................... 3

    I.4 Pembatasan Masalah ................................................................................. 6

    I.5 Jenis Dan Muatan Yang Diangkut ............................................................ 6

    I.5 Kecepatan Kapal Yang Dirancang ............................................................ 8

    I.7 Sistematika Penulisan ............................................................................... 9

    BAB II TINJAUAN PUSTAKA

    II.1 Tinjauan Perencanaan Kapal ................................................................... 10

    II.2 Bentuk Kontruksi Kapal .......................................................................... 10

    II.3 Pemilihan Mesin Induk............................................................................ 11

    II.4 Tinjauan Peraturan Internasional ............................................................. 11

    II.5 Fasilitas Pelabuhan Yang Disinggahi ...................................................... 12

    BAB III METODE PENELITIAN

    III.1 Metode Perhitungan Kapal ..................................................................... 18

    III.2 Diagram Alur Perancangan .................................................................... 19

    III.3 Perhitungan Pra Perancangan ................................................................. 23

    III.4 Ukuran Pokok Kapal Rancangan ........................................................... 30

  • ix

    BAB IV PERHITUNGAN DAN PERANCANGAN KAPAL

    IV.1 Perhitungan Rencana Garis .................................................................... 31

    IV.2 Hydrostatik Dan Bonjean Curves .......................................................... 40

    IV.3 Perhitungan Rencana Umum ................................................................. 49

    IV.4 Perkiraan Beban ..................................................................................... 103

    IV.5 Kontruksi Dasar Ganda .......................................................................... 137

    IV.6 Perhitungan Profil Gading-Gading ........................................................ 143

    IV.7 Perhitungan Kekuatan ............................................................................ 190

    IV.8 Perhitungan Floodable Length ............................................................... 202

    IV.9 Perhitungan Freeboard, Phimsol Mark Dan BRT,NRT ......................... 208

    IV.10 Stabilitas Kapal .................................................................................... 219

    IV.11 Perhitungan Peluncuran Kapal ............................................................. 256

    BAB V PENUTUP

    V.1 Kesimpulan ............................................................................................. 271

    V.2 Saran ........................................................................................................ 272

    V.3 Akhir Kata ............................................................................................... 272

    DAFTAR PUSTAKA

    RIWAYAT HDUP

  • x

    DAFTAR GAMBAR

    Gambar 1 Peta Jarak Surabaya - Jakarta .................................................... 8

    Gambar 2 Grafik LOA Berbanding DWT ................................................. 25

    Gambar 3 Grafik LPP Berbanding DWT .................................................. 26

    Gambar 4 Grafik H Berbanding DWT ...................................................... 26

    Gambar 5 Grafik B Berbanding DWT ....................................................... 27

    Gambar 6 Grafik T Berbanding DWT ....................................................... 27

    Gambar 7 Parametric Transformation ....................................................... 33

    Gambar 8 Calculate Hydrostatic ................................................................ 34

    Gambar 9 Curve Section Areas ................................................................. 35

    Gambar 10 Komponen Kekuatan Melintang ............................................... 191

    Gambar 11 Garis Air Bantu Dan Garis Air Sebenarnya .............................. 221

    Gambar 12 Pembagian Tujuh Station Menurut Tchebycheff ...................... 222

    Gambar 13 Penentuan Empat Keadaan Sarat Kapal .................................... 222

    Gambar 14 Kondisi Muatan 1/4 .................................................................. 223

    Gambar 15 Kondisi Muatan 1/2 .................................................................. 230

    Gambar 16 Kondisi Muatan 2/3 .................................................................. 237

    Gambar 17 Kondisi Muatan Full ................................................................. 244

    Gambar 18 Kurva Silang ............................................................................. 253

    Gambar 19 Kurva Stabilitas ......................................................................... 254

    Gambar 20 Periode Peluncuran ................................................................... 258

    Gambar 21 Sketsa Perhitungan Peluncuran ................................................. 265

  • xi

    DAFTAR TABBEL

    Tabel 1 Provinsi Penghasil Beras Terbesar Di Indonesia ..................... 5

    Tabel 2 Data Sample Kapal ................................................................. 24

    Tabel 3 Hasil Kurva Hidrostatik ......................................................... 44

    Tabel 4 Hasil Kurva Bonjean .............................................................. 48

    Tabel 5 Koefisien Harga Cstern ............................................................. 52

    Tabel 6 Harga Koefisien (1+k2) .......................................................... 52

    Tabel 7 Engine Speed Classifications ................................................. 62

    Tabel 8 Keuntungan Dan Kerugian Putaran Rendah,Tinggi ............... 62

    Tabel 9 Volume Ruang Muat I ............................................................ 97

    Tabel 10 Volume Tangki I .................................................................... 97

    Tabel 11 Volume Ruang Muat II .......................................................... 98

    Tabel 12 Volume Tangki II ................................................................... 98

    Tabel 13 Volume Ruang Muat III ......................................................... 99

    Tabel 14 Volume Tangki III .................................................................. 99

    Tabel 15 Volume Ruang Muat IV ....................................................... 100

    Tabel 16 Volume Tangki IV ............................................................... 100

    Tabel 17 Jumlah Side Girder ............................................................... 138

    Tabel 18 Jarak Side Girder .................................................................. 139

    Tabel 19 Komponen Penampang Midship .......................................... 192

    Tabel 20 Webster Cb=0,74 .................................................................. 206

    Tabel 21 Floodable Curve ................................................................... 207

    Tabel 22 Stabilitas Kondisi 1/4 (0-90) ................................................ 224

    Tabel 23 Stabilitas Kondisi 1/2( 0-90) ................................................ 231

    Tabel 24 Stabilitas Kondisi 2/3( 0-90) ................................................ 238

    Tabel 25 Stabilitas Kondisi Full( 0-90) ............................................... 245

    Tabel 26 Perhitungan Lengan Stabilitas Untuk Mencari LC 25% ...... 251

    Tabel 27 Perhitungan Lengan Stabilitas Untuk Mencari LC 50% ...... 251

    Tabel 28 Perhitungan Lengan Stabilitas Untuk Mencari LC 75% ...... 252

    Tabel 29 Perhitungan Lengan Stabilitas Untuk Mencari LC 100% .... 252

    Tabel 30 Koreksi Stabilitas ................................................................ 255

  • xii

    DAFTAR LAMPIRAN

    Lampiran 1 Gambar Rencana Garis (Lines Plan)

    Lampiran 2 Gambar Rencana Umum (General Arrangement)

    Lampiran 3 Gambar Bukaan Kulit (Shell Expansion)

    Lampiran 4 Gambar Konstruksi Profil (Profile Construction)

    Lampiran 5 Gambar Bagian Tengah Kapal (Midship Section)

    Lampiran 6 Gambar Kurva Hidrostatik (Hydrostatics Curves)

    Lampiran 7 Gambar Kurva Bonjean (Bonjean Curves)

    Lampiran 8 Gambar Kurva Floodable Length (Bonjean Curves)

    Lampiran 9 Gambar Plimsol Mark (Load Line)

    SCAN.pdfimg-818170218-0001.jpgimg-818170218-0002.jpgimg-818170218-0003.jpg

    ta.pdforipublipengesahan