NATIONAL SLUM UPGRADING PROGRAM - FY. 2018 KOTA …kotaku.pu.go.id/files/Media/Laporan/Contract...

51
Nomor Loan : IBRD Loan No. 7866-ID, Ln.7664-ID & No. 8213-ID, IBRD 8636-D & Ln, 0004 Nama Konsultan : PT. BUANA ARCHICON in JV with PT. SURYA ABADI KONSULTAN Paket : OVERSIGHT SERVICE PROVIDER (OSP) - Package 8 Coverage Area : ( SOUTH SULAWESI, WEST SULAWESI, CENTRAL SULAWESI, SOUTH EAST SULAWESI, NORTH SULAWESI AND GORONTALO PROVINCES) Nomor & Tanggal Kontrak : HK.02.03/OSP-8/IBRD/SATKER-PKP/005/2012, Tanggal 08 Mei 2012 Periode Kontrak : 08 Mei 2012 sd 30 Juni 2018 Amandemen No. : Amandement No. 24 - Efektif 23 Maret 2018 Perihal : - Perpanjangan Masa Penugasan hingga 30 Juni 2018 - Penambahan Biaya Kontrak - Restrukturisasi Personil Tim OSP TA 2018 - Penambahan kegiatan CB NO CONTRACT AMENDMENT NO. 24 I TOTAL REMUNERATION [ 1.1 + 1.2 + Fee ] 61.504.309.767 1.1 Proffesional Staff 42.724.435.643 1.2 Supporting Staf 7.483.164.167 Fee […….. % x [ 1.1+1.2 ]] II TOTAL DIRECT REIMBURSABLE EXPENSES [ 2.1 + 2.2 + 2.3 + 2.4 + 2.5 + 2.6 + 2.7 20.424.998.577 2.1 Duty Travel Expenses Province South Sulawesi [ a + b + c ] 677.422.595 a Transport 486.822.595 b Hotel Acomodation 88.900.000 c OSA [ Fixed ] 101.700.000 2.2 Duty Travel Expenses Province West Sulawesi [ a + b + c ] 288.800.700 a Transport 205.650.700 b Hotel Acomodation 31.500.000 c OSA [ Fixed ] 51.650.000 2.3 Duty Travel Expenses Province South East Sulawesi [ a + b + c ] 442.094.900 a Transport 343.094.900 b Hotel Acomodation 33.700.000 c OSA [ Fixed ] 65.300.000 2.4 Duty Travel Expenses Province Central Sulawesi [ a + b + c ] 387.069.400 a Transport 304.769.400 b Hotel Acomodation 24.400.000 c OSA [ Fixed ] 57.900.000 2.5 Duty Travel Expenses Province Gorontalo [ a + b + c ] 334.797.000 a Transport 268.847.000 b Hotel Acomodation 16.650.000 c OSA [ Fixed ] 49.300.000 2.6 Duty Travel Expenses Province North Sulawesi [ a + b + c ] 598.988.750 a Transport 497.363.750 b Hotel Acomodation 31.975.000 NATIONAL SLUM UPGRADING PROGRAM - FY. 2018 KOTA TANPA KUMUH "KOTAKU" SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT DESCRIPTION

Transcript of NATIONAL SLUM UPGRADING PROGRAM - FY. 2018 KOTA …kotaku.pu.go.id/files/Media/Laporan/Contract...

Nomor Loan : IBRD Loan No. 7866-ID, Ln.7664-ID & No. 8213-ID, IBRD 8636-D & Ln, 0004

Nama Konsultan : PT. BUANA ARCHICON in JV with

PT. SURYA ABADI KONSULTAN

Paket : OVERSIGHT SERVICE PROVIDER (OSP) - Package 8

Coverage Area : ( SOUTH SULAWESI, WEST SULAWESI, CENTRAL SULAWESI,

SOUTH EAST SULAWESI, NORTH SULAWESI AND GORONTALO PROVINCES)

Nomor & Tanggal Kontrak : HK.02.03/OSP-8/IBRD/SATKER-PKP/005/2012, Tanggal 08 Mei 2012

Periode Kontrak : 08 Mei 2012 sd 30 Juni 2018

Amandemen No. : Amandement No. 24 - Efektif 23 Maret 2018

Perihal : - Perpanjangan Masa Penugasan hingga 30 Juni 2018

- Penambahan Biaya Kontrak

- Restrukturisasi Personil Tim OSP TA 2018

- Penambahan kegiatan CB

NO CONTRACT

AMENDMENT NO. 24

I TOTAL REMUNERATION [ 1.1 + 1.2 + Fee ] 61.504.309.767

1.1 Proffesional Staff 42.724.435.643

1.2 Supporting Staf 7.483.164.167

Fee […….. % x [ 1.1+1.2 ]]

II TOTAL DIRECT REIMBURSABLE EXPENSES [ 2.1 + 2.2 + 2.3 + 2.4 + 2.5 + 2.6 + 2.7 + Fee ] 20.424.998.577

2.1 Duty Travel Expenses Province South Sulawesi [ a + b + c ] 677.422.595

a Transport 486.822.595

b Hotel Acomodation 88.900.000

c OSA [ Fixed ] 101.700.000

2.2 Duty Travel Expenses Province West Sulawesi [ a + b + c ] 288.800.700

a Transport 205.650.700

b Hotel Acomodation 31.500.000

c OSA [ Fixed ] 51.650.000

2.3 Duty Travel Expenses Province South East Sulawesi [ a + b + c ] 442.094.900

a Transport 343.094.900

b Hotel Acomodation 33.700.000

c OSA [ Fixed ] 65.300.000

2.4 Duty Travel Expenses Province Central Sulawesi [ a + b + c ] 387.069.400

a Transport 304.769.400

b Hotel Acomodation 24.400.000

c OSA [ Fixed ] 57.900.000

2.5 Duty Travel Expenses Province Gorontalo [ a + b + c ] 334.797.000

a Transport 268.847.000

b Hotel Acomodation 16.650.000

c OSA [ Fixed ] 49.300.000

2.6 Duty Travel Expenses Province North Sulawesi [ a + b + c ] 598.988.750

a Transport 497.363.750

b Hotel Acomodation 31.975.000

NATIONAL SLUM UPGRADING PROGRAM - FY. 2018

KOTA TANPA KUMUH "KOTAKU"

SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM)

KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT

DESCRIPTION

NO CONTRACT

AMENDMENT NO. 24 DESCRIPTION

c OSA [ Fixed ] 69.650.000

2.7 Office Operational Expenses [ a + b + c ] 3.084.876.311

a Office Running Cost 1.594.244.492

b Office Supply & Consumable 647.522.717

c Communication Cost 798.109.102

d BOP Tim Percepatan Kota 45.000.000

2.8 Office Equipment Expenses [ Purchases ] [ a + b + c + d + e + f + g + h + i ] 1.003.050.000

a Desktop Computer 368.250.000

b Laptop/Notebook 404.000.000

c Printer Laser Jet 58.000.000

d Printer Color A3 40.500.000

e Digital Camera -

f GPS tools 21.000.000

g LCD Projector 30.000.000

h Scanner 13.800.000

i Equipment Maintenance (Include existing equipment) -

j Peta Citra Satelit (Scala 1 : 5000) -

Peta Citra Satelit (Scala 1 : 5000) -

-

k Alat Ukur 67.500.000

2.9 Rental Expenses [ a + b + c ] 12.643.965.250

a Office Space 1.975.518.000

b Vehicle 10.288.647.250

c Motorcycle 379.800.000

2.10 Reporting Expenses [ a + b ] 94.096.450

a Regular Report 83.646.450

b Special Report 10.450.000

Fee [[……... % x [ 2.1 + 2.2 + 2.3 + 2.4 + 2.5 + 2.6 + 2.7a + 2.7b ]]

III 6.310.407.478

3.1 Training Activity 2012 [ Fixed ] 365.008.350

3.2 Training Activity 2013 [ Fixed ] 5.122.302.500

Fee [[……... % x [ 3.1 + 3.2 + 3.3]]

IV TOTAL SOCIALIZATION ACTIVITY EXPENSES [ 4.1 + 4.2 + Fee ] 4.919.984.979

4.1 Socilization Activity in Provincial Levels [ Fixed ] 727.345.200

4.2 Socilization Activity in City/Regency Levels [ Fixed ] 1.811.772.173

Fee [[…….. % x [ 4.1 + 4.2 ]]

4.3 Penyusunan Dokumen RPLP/RTPLP 2.000.000.000

V TOTAL V [ I + l II + III + IV ] 93.159.700.800

TOTAL TRAINING ACTIVITY EXPENSES [ 3.1 + 3.2 + 3.3 + Fee ]

Name Position Vol THP Amount (IDR)

1.1 42.724.435.643

1.1.1 18 1.594.550.000

1 Irzal Kifli 1 Person/Month 12,77 17.000.000 217.033.333

Anis Sutrijono Person/Month 24,00 17.000.000 408.000.000

19,00 18.100.000 343.900.000

2 Agustiar 1 Person/Month 19,77 5.000.000 98.833.333

4,00 5.500.000 22.000.000

Andi Ardiansyah 12,00 5.000.000 60.000.000

4,00 5.300.000 21.200.000

Mustar 15,00 5.300.000 79.500.000

3 Riswan Feizal 1 Person/Month 18,77 6.500.000 121.983.333

Muhammad Yazid Bustami 14,00 6.500.000 91.000.000

4,00 6.900.000 27.600.000

Andi Ardiansyah 15,00 6.900.000 103.500.000

1.1.2 9.930.568.367

1 Suparman Provincial Team Leader 1 Person/Month 19,77 12.000.000 237.200.000

4,00 13.300.000 53.200.000

Kamaruddin Andi Jemmang 13,00 13.300.000 172.900.000

7,00 14.200.000 99.400.000

Bakhrun Gassing 25,56 14.200.000 362.909.091

3,50 14.700.000 51.450.000

2 Bukhari Menge Monev Specialist 1 Person/Month 14,77 8.500.000 125.516.667

Muawiyah 18,00 8.500.000 153.000.000

Muawiyah 33,50 9.000.000 301.500.000

3,50 9.700.000 33.950.000

3 Muawiyah a. Sub Spec. Monev PNPM 1 Person/Month 18,77 6.500.000 121.983.333

Agustiar 13,00 6.500.000 84.500.000

4,00 6.900.000 27.600.000

Hasruddin Dg Ngitung 15,00 6.900.000 103.500.000

4 Muh. Darwis b. Sub Spec. Monev Advance 1 Person/Month 19,77 6.500.000 128.483.333

17,00 7.200.000 122.400.000

19,00 7.600.000 144.400.000

5 Akhmad Rivai MIS Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

24,50 9.400.000 230.300.000

6 Rahmadi Socialization Specialist 1 Person/Month 0,77 8.000.000 6.160.000

Hasanuddin AT 19,00 8.000.000 152.000.000

15,26 8.800.000 134.318.280

1,00 9.400.000 9.400.000

Andi Muh. Syarif Hidayat 15,00 9.400.000 141.000.000

Hasrudin 3,50 8.000.000 28.000.000

7 Kamaruddin Andi Jemmang Training Specialist 1 Person/Month - 8.000.000 -

Rahmadi 19,00 8.000.000 152.000.000

17,00 8.800.000 149.600.000

Rahmadi 35,50 9.400.000 333.700.000

8 Tobe Name Sub Specialist SME's - 6.500.000 -

9 Hasanuddin AT a. Sub Spec.Training/CB for PNPM 1 Person/Month 0,77 6.500.000 5.005.000

Nurafni Najib 19,00 6.500.000 123.500.000

17,00 7.200.000 122.400.000

18,91 7.600.000 143.709.091

10 Hadlan Habe Infrastructure Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

2,00 9.400.000 18.800.000

Muhammad Rusydi 29,41 9.400.000 276.445.454

3,50 9.800.000 34.300.000

11 Muhammad Rusydia. Sub Spec.Infrastructure/CB for

PNPM1 Person/Month 19,77 6.500.000 128.483.333

17,00 7.200.000 122.400.000

4,00 7.600.000 30.400.000

Ady Anwar Ramang 15,00 7.600.000 114.000.000

12 Andi Nadjamuddin Micro Fin & Fin.Mgmt Spec. 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

31,50 9.400.000 296.100.000

13 Suyuti Saleng a. Sub Spec. Fin.Mgmt for PNPM 1 Person/Month 19,77 6.500.000 128.483.333

17,00 7.200.000 122.400.000

19,00 7.600.000 144.400.000

14 Andi Muh. Syarif Hidayat b. Sub Specialist RLF 1 Person/Month 19,77 6.500.000 128.483.333

17,00 7.200.000 122.400.000

4,00 7.600.000 30.400.000

Lukman 15,00 7.600.000 114.000.000

15 Anwar Sulili 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

2,00 9.400.000 18.800.000

Agustiar 27,00 9.400.000 253.800.000

16 Munirfan Munir Urban Planner Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

Munirfan Munir 35,50 9.400.000 333.700.000

17 Haerani 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Haerani 22,00 5.800.000 127.600.000

18 Abdul Malik 1 Person/Month - 5.000.000 -

Burhanuddin 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Local Gov & Public Policy Spec /

Collaboration Local Government

Specialist

Sub Proff. Financial

(Comm.Grant)Minimum 1 person for each

city with about @ 75 kel/ ds

PROFESSIONAL STAFF

OSP LEVELS

Program Director OC

Assisten OC

Sub Spec. Legal & CHU

PROVINCE SOUTH SULAWESI

CONTRACT AMENDMENT NO. 24

I. BREAKDOWN OF REMUNERATION

NO.DESCRIPTION

Person Number Unit

Name Position Vol THP Amount (IDR)

NO. Person Number Unit

Burhanuddin 14,00 5.800.000 81.200.000

19 Anita Burhan 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Anita Burhan 10,00 5.800.000 58.000.000

20 Hj. Hamdana 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

3,00 5.800.000 17.400.000

Akmal Ismail 6,00 5.800.000 34.800.000

21 Andi Suhana 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Subprof Adm Asst For Korkot - KM 10,00 5.800.000 58.000.000

22 Haslinda Aziz 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Subprof Adm Asst For Prov Satker 33,50 5.800.000 194.300.000

3,50 6.290.000 22.015.000

1 Tri Budiharto GIS Specialist 3,00 6.500.000 19.500.000

2 Arief Hidayah Urban Planner Specialist 3,00 6.500.000 19.500.000

3 Arjan Saleng Architecture/Civil Specialist 3,00 6.500.000 19.500.000

4 Rasdiana Environmental Specialist 3,00 6.500.000 19.500.000

5 TBN Cost Estimator 2,00 6.500.000 13.000.000

6 TBN Drafter 5,16 5.000.000 25.806.451

7 TBN Surveyor 5,00 5.000.000 25.000.000

8 TBN Tenaga Lokal 10,00 3.000.000 30.000.000

1.1.3 7.491.419.123

1 Ahmad Ismail Provincial Team Leader 1 Person/Month 19,77 11.500.000 227.316.667

4,00 12.700.000 50.800.000

Suparman 13,00 12.700.000 165.100.000

3,00 13.500.000 40.500.000

Ahmad Ismail 29,50 13.500.000 398.250.000

3,50 14.200.000 49.700.000

2 Sudrajat Monev Specialist 1 Person/Month 4,77 8.500.000 40.516.667

Saimudin 12,00 8.500.000 102.000.000

14,00 9.100.000 127.400.000

33,50 9.700.000 324.950.000

3,50 10.500.000 36.750.000

3 Sri Maulina MIS Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

24,50 9.400.000 230.300.000

4 Sismono Socialization Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

19,00 9.400.000 178.600.000

Andi Ardiansyah 3,50 8.000.000 28.000.000

5 Suyuti Training Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

35,50 9.400.000 333.700.000

6 Nursia Sinaga Sub Specialist SME’s 1 Person/Month 19,77 6.500.000 128.483.333

17,00 7.200.000 122.400.000

19,00 7.600.000 144.400.000

7 Saleh Kamil Infrastructure Specialist 1 Person/Month 7,77 8.000.000 62.133.333

La Ode Alfitrah H. Hadana 12,00 8.000.000 96.000.000

14,00 8.600.000 120.400.000

33,50 9.100.000 304.850.000

3,50 9.800.000 34.300.000

8 Ahmad Taufik Micro Fin & Fin.Mgmt Spec. 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

33,50 9.400.000 314.900.000

9 St. Hamidiyah Sub Specialist RLF 1 Person/Month - 6.500.000 -

Imam Mualim Tabroni 19,77 6.500.000 128.483.333

8,00 7.200.000 57.600.000

Siti Hamidyah 6,00 7.200.000 43.200.000

19,00 7.600.000 144.400.000

10 Astah Abdul Fattah 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

25,50 9.400.000 239.700.000

Sismono 5,50 8.000.000 44.000.000

11 Ali Amin Soewarno 1 Person/Month - 8.000.000 -

Muhammad Nasir 11,77 8.000.000 94.133.333

Bambang Hermanto 11,63 8.000.000 93.066.667

4,00 8.000.000 32.000.000

Yuli Eka Ernawati 24,50 8.500.000 208.250.000

12 Imam Tabrani 1 Person/Month - 5.000.000 -

Alfis Syahriani 19,77 5.000.000 98.833.333

9,00 5.500.000 49.500.000

Fitri H 6,00 5.500.000 33.000.000

3,00 5.800.000 17.400.000

Kasmudin 28,00 5.800.000 162.400.000

13 Eva Aprianti 1 Person/Month - 5.000.000 -

Sub Proff. Financial

(Comm.Grant)Minimum 1 person for each

city with about @ 75 kel/ ds

Sub Proff. Administration (Fix cost)Min.

1 person for each provinces with 200

fix cost contract administration

PROVINCE SOUTH EAST SULAWESI

Local Gov & Public Policy Spec /

Collaboration Local Government

Specialist

Urban Planner Specialist

Sub Proff. Financial

(Comm.Grant)Minimum 1 person for each

city with about @ 75 kel/ ds

Name Position Vol THP Amount (IDR)

NO. Person Number Unit

Man Arfa 19,77 5.000.000 98.833.332

10,00 5.500.000 55.000.000

LM. Syukur Nurdin 6,00 5.500.000 33.000.000

Subprof Adm Asst For Korkot - KM 14,00 5.800.000 81.200.000

14 Man Arfa 1 Person/Month - 5.000.000 -

Eva Aprianti 19,77 5.000.000 98.833.334

17,00 5.500.000 93.500.000

Kasmudin / Fitri H Subprof Adm Asst For Prov Satker 37,00 5.800.000 214.600.000

TIM PERCEPATAN KOTA

1 Erlan GIS Specialist 3,00 6.500.000 19.500.000

2 Irwan Gunawan Urban Planner Specialist 3,00 6.500.000 19.500.000

3 Aldi Noman Architecture/Civil Specialist 2,87 6.500.000 18.631.337

4 Mohammad Fachrudin Environmental Specialist 2,87 6.500.000 18.631.337

5 TBN Cost Estimator 2,00 6.500.000 13.000.000

6 TBN Drafter 5,16 5.000.000 25.806.451

7 TBN Surveyor 5,00 5.000.000 25.000.000

8 TBN Tenaga Lokal 10,00 3.000.000 30.000.000

1.1.4 8.508.258.844

1 Muh. Nadjib Noor Provincial Team Leader 1 Person/Month - 12.000.000 -

Kamaruddin Andi Jemmang 19,77 12.000.000 237.200.000

4,00 13.300.000 53.200.000

Ahmad Ismail 13,00 13.300.000 172.900.000

4,00 14.200.000 56.800.000

Riswan Feizal 20,00 14.200.000 284.000.000

Anis Sutrijono 12,50 14.200.000 177.500.000

2 Dodi Feriindra Monev Specialist 1 Person/Month 17,12 8.500.000 145.532.796

Riswan Feizal 17,00 8.500.000 144.500.000

- 9.000.000 -

4,00 8.500.000 34.000.000

Teddy Sulangi - 9.000.000 -

29,50 8.500.000 250.750.000

3,50 8.900.000 31.150.000

Ruben Kalalo Sub Spec. Monev PNPM - 8.500.000 -

13,00 6.500.000 84.500.000

19,00 6.900.000 131.100.000

3 Sonny Manabung MIS Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

20,00 9.400.000 188.000.000

Nico Joudy Rumbajan 5,50 8.000.000 44.000.000

4 Zulkifli Idris Socialization Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

3,00 9.400.000 28.200.000

Theresia Wulan Sari 17,74 9.400.000 166.738.046

5 Kalla Manta Training Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

5,50 9.400.000 51.700.000

Alharist Honowu 29,00 9.400.000 272.600.000

Sutrisno a. Sub Spec.Training for PNPM 1 Person/Month 6,50 6.500.000 42.250.000

Eka Widiastuty Manangin 13,50 6.500.000 87.750.000

6 Franky Van Pamelen Sub Specialist SME’s 1 Person/Month 0,77 6.500.000 4.983.333

Alharist Honowu 17,00 6.500.000 110.500.000

17,00 7.200.000 122.400.000

5,50 7.600.000 41.800.000

Sutrisno 13,50 7.600.000 102.600.000

7 Hari Pramono Infrastructure Specialist 1 Person/Month 7,77 8.000.000 62.133.333

Novrey Wurangian 12,00 8.000.000 96.000.000

17,00 8.800.000 149.600.000

31,50 9.400.000 296.100.000

Stevy Oike Manopo 5,50 8.000.000 44.000.000

Stevy Oike Manopoa. Sub Spec.Infrastructure/CB for

PNPM 13,00 6.500.000 84.500.000

19,00 6.900.000 131.100.000

8 Acep Mawardi Micro Fin & Fin.Mgmt Spec. 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

1,00 9.400.000 9.400.000

Noldy Fransiskus Wowor 28,50 9.400.000 267.900.000

9 Nuruddin Toriq Sub Specialist RLF 1 Person/Month 0,77 6.500.000 4.983.333

Franky Van Pamelen 6,00 6.500.000 39.000.000

Noldy Fransiskus Wowor 13,00 6.500.000 84.500.000

14,00 6.900.000 96.600.000

4,00 7.300.000 29.200.000

Sandra Purukan 15,00 7.300.000 109.500.000

10 Ferdinand Kalaseran Local Gov & Public Policy Spec 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

20,00 9.400.000 188.000.000

Riswan Feizal / Ferdinand Kaliserang 11,00 9.400.000 103.400.000

11 Novrey Wurangian 1 Person/Month 7,77 8.000.000 62.133.333

Mohamad Taufik 13,00 8.000.000 104.000.000

25,00 8.500.000 212.500.000

Novrey Wurangian 5,50 8.500.000 46.750.000

12 Tatik Setyaningrum 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

- 5.800.000 -

Pujianto / Eka Widiastuty Manangin 10,00 5.800.000 58.000.000

13 Sutrisno 1 Person/Month 19,77 5.000.000 98.833.333

16,00 5.500.000 88.000.000

Eka Widiastuty Manangin 6,50 5.500.000 35.750.000

Sriwahyuni Bugis / Eka Widiastuty Manangin 4,00 5.500.000 22.000.000

14 Rois Wahyudi 1 Person/Month 19,77 5.000.000 98.833.333

Sub Proff. Financial

(Comm.Grant)Minimum 1 person for each

city with about @ 75 kel/ ds

Sub Proff. Administration (Fix cost)Min. 1

person for each provinces with 200 fix

cost contract administration

PROVINCE NORTH SULAWESI

Urban Planner Specialist

Sub Proff. Financial

(Comm.Grant)Minimum 1 person for each

city with about @ 75 kel/ ds

Name Position Vol THP Amount (IDR)

NO. Person Number Unit

17,00 5.500.000 93.500.000

6,00 5.800.000 34.800.000

Achmad Arif Sya'roni / Sutrisno 14,50 5.800.000 84.100.000

15 Sandra Purukan 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

4,00 5.800.000 23.200.000

Sumarni Anuna Subprof Adm Asst For Korkot - KM 14,00 5.800.000 81.200.000

16 Aneke Inggrid Untu 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Subprof Adm Asst For Prov Satker 33,50 5.800.000 194.300.000

3,50 6.290.000 22.015.000

TIM PERCEPATAN KOTA

1 Franklin EJ Wongkar GIS Specialist 2,87 6.500.000 18.631.337

2 Putri Handayani Amara Urban Planner Specialist 3,00 6.500.000 19.500.000

3 Felix Yonas Bogar Architecture/Civil Specialist 3,00 6.500.000 19.500.000

4 Yufita Feibe Lengkey Environmental Specialist 3,00 6.500.000 19.500.000

5 TBN Cost Estimator 2,00 6.500.000 13.000.000

6 TBN Drafter 5,99 5.000.000 29.974.999

7 TBN Surveyor 4,00 5.000.000 20.000.000

8 TBN Tenaga Lokal 10,00 3.000.000 30.000.000

1.1.5 4.835.510.237

1 Andi Asdar Provincial Team Leader 1 Person/Month 19,77 12.000.000 237.200.000

17,00 13.300.000 226.100.000

3,14 14.200.000 44.628.571

Kalla Manta 28,00 14.200.000 397.600.000

3,50 15.400.000 53.900.000

2 Muh. Darwis MIS Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

19,00 9.400.000 178.600.000

Jani Johanes Rompas 5,50 8.000.000 44.000.000

3 Irawan Hasan Training Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

35,50 9.400.000 333.700.000

4 Tobe Name Sub Specialist SME's - 6.500.000 -

5 Yusuf Ikatiwa Infrastructure Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

33,50 9.400.000 314.900.000

3,50 10.200.000 35.700.000

6 Ali Kamri Micro Fin & Fin.Mgmt Spec. 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

33,50 9.400.000 314.900.000

7 Sultan 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

3,00 9.400.000 28.200.000

Muhammad Yazid Bustami 27,00 9.400.000 253.800.000

8 A. Muh. Irfan 1 Person/Month 11,77 8.000.000 94.133.333

Tiobe Named 3,50 8.000.000 28.000.000

9 Muh. Mamat 1 Person/Month - 5.000.000 -

Muhammad 19,77 5.000.000 98.833.333

4,00 5.500.000 22.000.000

Dardi 12,00 5.500.000 66.000.000

Subprof Adm Asst For Korkot - KM 20,50 5.800.000 118.900.000

10 Muh. Anwar 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Subprof Adm Asst For Prov Satker 33,00 5.800.000 191.400.000

3,50 6.290.000 22.015.000

1.1.6 5.559.368.357

1 Tasrif Siara Provincial Team Leader 1 Person/Month 19,77 11.500.000 227.316.667

17,00 12.700.000 215.900.000

33,50 13.500.000 452.250.000

3,50 14.450.000 50.575.000

Monev Specialist 3,50 8.500.000 29.750.000

2 Rahmat Hidayat MIS Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

24,50 9.400.000 230.300.000

Muh Isnaeni Muhidin Socialization Specialist 3,50 8.000.000 28.000.000

3 Moh. Syukran Training Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

35,50 9.400.000 333.700.000

4 Tobe Name Sub Specialist SME's - 6.500.000 -

5 Hasyim Ajab Infrastructure Specialist 1 Person/Month 3,77 8.000.000 30.160.000

Moh. Gazali 16,00 8.000.000 128.000.000

17,00 8.800.000 149.600.000

33,50 9.400.000 314.900.000

3,50 10.200.000 35.700.000

6 Fajar Siregar Micro Fin & Fin.Mgmt Spec. 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

33,50 9.400.000 314.900.000

7 Ketut Sucipta 1 Person/Month - 8.000.000 -

Sudirman K. Udja 19,77 8.000.000 158.133.334

17,00 8.800.000 149.600.000

7,00 9.400.000 65.800.000

Ketut Sucipta 20,00 9.400.000 188.000.000

8 Moh. Gazali Urban Planner Specialist 1 Person/Month 3,77 8.000.000 30.133.333

PROVINCE WEST SULAWESI

Local Gov & Public Policy Spec /

Collaboration Local Government

Specialist

Urban Planner Specialist

Sub Proff. Financial

(Comm.Grant)Minimum 1 person for each

city with about @ 75 kel/ ds

Sub Proff. Administration (Fix cost)Min. 1

person for each provinces with 200 fix

cost contract administration

PROVINCE CENTRAL SULAWESI

Local Gov & Public Policy Spec /

Collaboration Local Government

Specialist

Sub Proff. Administration (Fix cost)Min. 1

person for each provinces with 200 fix

cost contract administration

Sub Proff. Financial

(Comm.Grant)Minimum 1 person for each

city with about @ 75 kel/ ds

Name Position Vol THP Amount (IDR)

NO. Person Number Unit

Zubair Butudoka 15,00 8.000.000 120.000.000

17,00 8.800.000 149.600.000

7,00 9.400.000 65.800.000

Tri Mailan Budiarto 21,00 9.400.000 197.400.000

3,50 8.000.000 28.000.000

9 Soraya Listyorini 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Soraya Listyorini Subprof Adm Asst For Korkot - KM 29,50 5.800.000 171.100.000

10 Sunarsih Tahudi 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Subprof Adm Asst For Prov Satker 33,50 5.800.000 194.300.000

3,50 6.290.000 22.015.000

TIM PERCEPATAN KOTA

1 Hamzah Haryono GIS Specialist 3,00 6.500.000 19.500.000

2 Syamsuria Satria Urban Planner Specialist 2,81 6.500.000 18.261.905

3 Cerdasir Mastika Architecture/Civil Specialist 3,00 6.500.000 19.500.000

4 Nur Zain Environmental Specialist 3,00 6.500.000 19.500.000

5 TBN Cost Estimator 2,00 6.500.000 13.000.000

6 TBN Drafter 5,16 5.000.000 25.806.451

7 TBN Surveyor 5,00 5.000.000 25.000.000

8 TBN Tenaga Lokal 10,00 3.000.000 30.000.000

1.1.7 4.804.760.715

1 Bakhrun Gassing Provincial Team Leader 1 Person/Month 19,77 11.500.000 227.316.667

17,00 12.700.000 215.900.000

8,00 13.500.000 108.000.000

Ilham Hamid 25,50 13.500.000 344.250.000

3,50 14.400.000 50.400.000

Riswan Feizal Monev Specialist 3,50 8.500.000 29.750.000

2 Adi Taufik MIS Specialist 1 Person/Month - 8.000.000 -

Harun 12,00 8.000.000 96.000.000

14,00 8.600.000 120.400.000

24,25 9.100.000 220.675.000

Mustar Socialization Specialist 3,50 8.000.000 28.000.000

3 Agustina Abdullah Training Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

35,50 9.400.000 333.700.000

4 Tobe Name Sub Specialist SME's - 6.500.000 -

5 Rahmad Syukrianto Infrastructure Specialist 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

33,50 9.400.000 314.900.000

3,50 10.200.000 35.700.000

6 Ahmad Kadir Micro Fin & Fin.Mgmt Spec. 1 Person/Month 19,77 8.000.000 158.133.333

17,00 8.800.000 149.600.000

33,50 9.400.000 314.900.000

7 Yamin Ibrahim 1 Person/Month 13,77 8.000.000 110.133.333

Estefanus Wolok 5,00 8.000.000 40.000.000

Abdul Wahidin 10,00 8.000.000 80.000.000

23,15 8.500.000 196.775.000

Totong Hardianto Mozin 5,50 8.000.000 44.000.000

8 Irfan, ST Urban Planner Specialist 1 Person/Month 15,27 8.000.000 122.133.333

9 Dewi Kurniati Panigoro 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Dewi Kurniati Panigoro / Yuliah Mutmainnah Subprof Adm Asst For Korkot - KM 20,20 5.800.000 117.160.000

10 Muhamad Ali Hasan 1 Person/Month 19,77 5.000.000 98.833.333

17,00 5.500.000 93.500.000

Subprof Adm Asst For Prov Satker 32,50 5.800.000 188.500.000

3,50 6.290.000 22.015.000

TIM PERCEPATAN KOTA

1 Irawan Matalupu GIS Specialist 2,48 6.500.000 16.095.238

2 Irfan Urban Planner Specialist 2,48 6.500.000 16.095.238

3 Fatmawati Tulibu Architecture/Civil Specialist 2,48 6.500.000 16.095.238

4 TBN Environmental Specialist - 6.500.000 -

5 TBN Cost Estimator 2,00 6.500.000 13.000.000

6 TBN Drafter 4,00 5.000.000 20.000.000

7 TBN Surveyor 5,00 5.000.000 25.000.000

8 TBN Tenaga Lokal 10,00 3.000.000 30.000.000

1.2 7.483.164.167

1.2.1 1.054.471.667

1 Herlina Ruru Office Manager 1 Person/Month 19,77 3.500.000 69.183.333

17,00 3.800.000 64.600.000

33,50 4.000.000 134.000.000

3,50 4.340.000 15.190.000

Tri Yulianti Assistant Office Manager 1 Person/Month 13,00 2.000.000 26.000.000

13,00 2.100.000 27.300.000

18,95 2.200.000 41.690.000

2 Sry Rosmita/Gustiara Indah/Sry Rosmita/Tri Yulianti Secretary 1 Person/Month 19,77 2.000.000 39.533.333

17,00 2.200.000 37.400.000

Tri Yulianti 33,50 2.350.000 79.900.000

3,50 2.550.000 8.925.000

Sub Proff. Administration (Fix cost)Min. 1

person for each provinces with 200 fix

cost contract administration

SUPPORTING STAFF

PROVINCE SOUTH SULAWESI

Sub Proff. Financial

(Comm.Grant)Minimum 1 person for each

city with about @ 75 kel/ ds

Sub Proff. Financial

(Comm.Grant)Minimum 1 person for each

city with about @ 75 kel/ ds

Sub Proff. Administration (Fix cost)Min. 1

person for each provinces with 200 fix

cost contract administration

PROVINCE GORONTALO

Local Gov & Public Policy Spec /

Collaboration Local Government

Specialist

Name Position Vol THP Amount (IDR)

NO. Person Number Unit

3 Gustiara Indah/Sry Rosmita/Andi Zulaehah Computer Operator -1 1 Person/Month 19,77 1.500.000 29.650.000

17,00 1.600.000 27.200.000

29,45 1.700.000 50.065.000

3,50 1.840.000 6.440.000

4 Zulfahmi Farma/A. Fitria Syam Computer Operator -2 1 Person/Month 19,77 1.500.000 29.650.000

39,00 1.600.000 62.400.000

5 Muthmainnah/Maulidah Al Zahra/Meutia Nadjib/ Computer Operator -3 1 Person/Month 19,77 1.500.000 29.650.000

Suherianto 17,00 1.600.000 27.200.000

18,95 1.700.000 32.215.000

6 Udin/Rahmawati R/Agnus Blasius Senda Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

7 Yusuf/Fransiskus Nggeli Security-1 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

19,00 1.100.000 20.900.000

8 Abdul Karim/Apdy RadaMikael Joke Jata Security-2 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

28,50 1.150.000 32.775.000

3,50 1.240.000 4.340.000

1.2.2 735.030.000

1 Agnes Irene Laban/Hasna Usman Ass Office Manager 1 Person/Month 19,77 2.000.000 39.533.333

17,00 2.200.000 37.400.000

33,50 2.350.000 79.900.000

3,50 2.550.000 8.925.000

2 Hasna Usman/Fatri Yanti. T Secretary 1 Person/Month 19,77 1.750.000 34.591.667

17,00 1.850.000 31.450.000

33,50 1.900.000 63.650.000

3,50 2.060.000 7.210.000

3 Adam Rustam/Amsyarulah/Askrin/Amsyarulah Computer Operator -1 1 Person/Month 19,77 1.500.000 29.650.000

Akrin 17,00 1.600.000 27.200.000

33,50 1.700.000 56.950.000

3,50 1.840.000 6.440.000

4 Fahri Computer Operator -2 1 Person/Month 19,77 1.500.000 29.650.000

17,00 1.600.000 27.200.000

19,00 1.700.000 32.300.000

5 John/Bernadus S Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

6 Amsyarulah/Meyson L Security-1 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

19,00 1.150.000 21.850.000

7 Asrani/Edi Hartono Security-2 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

1.2.3 733.855.000

1 Bachtiar Efendi/Sriwahyuni Bugis Ass Office Manager 1 Person/Month 19,77 2.000.000 39.533.333

17,00 2.200.000 37.400.000

33,50 2.350.000 78.725.000

3,50 2.550.000 8.925.000

2 Sriwahyuni Bugis/Fitriani Kaplale/Sriwahyuni Bugis/ Secretary 1 Person/Month 19,77 1.750.000 34.591.667

Muniyati Irsyad/Hasan Baa 17,00 1.850.000 31.450.000

33,50 1.900.000 63.650.000

3,50 2.060.000 7.210.000

3 Abdul Zulfikar Eli/Hasan Baa/Irwan Daud Computer Operator -1 1 Person/Month 19,77 1.500.000 29.650.000

17,00 1.600.000 27.200.000

33,50 1.700.000 56.950.000

3,50 1.840.000 6.440.000

4 Irawan Daud Computer Operator -2 1 Person/Month 19,77 1.500.000 29.650.000

17,00 1.600.000 27.200.000

19,00 1.700.000 32.300.000

5 Suryati Tampolo Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

6 Herman Security-1 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

19,00 1.150.000 21.850.000

7 Cirman/Sudirman Security-2 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

1.2.4 730.633.500

1 Nurhuda Ass Office Manager 1 Person/Month 19,77 2.000.000 39.533.333

17,00 2.200.000 37.400.000

33,50 2.350.000 78.725.000

3,50 2.550.000 8.925.000

2 Zulviana Latif Secretary 1 Person/Month 19,77 1.750.000 34.591.667

18,00 1.850.000 33.300.000

32,50 1.900.000 61.750.000

3,50 2.060.000 7.210.000

3 Endy Selvi/Muhammad Abdi/Muh. Alyafief. B/ Computer Operator -1 1 Person/Month 19,77 1.500.000 29.650.000

Siti Sarmilayanti Sahar 17,00 1.600.000 27.200.000

33,50 1.700.000 56.950.000

3,50 1.840.000 6.440.000

4 Dian Soraya/Dardi/Siti Sarmilayanti S Computer Operator -2 1 Person/Month 19,77 1.500.000 29.650.000

16,00 1.600.000 25.600.000

19,00 1.700.000 32.300.000

PROVINCE SOUTHEAST SULAWESI

PROVINCE NORTH SULAWESI

PROVINCE WEST SULAWESI

Name Position Vol THP Amount (IDR)

NO. Person Number Unit

5 Irham/Ramlah Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

6 Sunaryon/Irham Security-1 1 Person/Month 19,77 1.000.000 19.766.667

16,00 1.100.000 17.600.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

7 Pardi/Ramli Security-2 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

18,59 1.150.000 21.378.500

1.2.5 731.150.000

1 Mairah, SE Ass Office Manager 1 Person/Month 19,77 2.000.000 39.533.333

17,00 2.200.000 37.400.000

33,50 2.300.000 77.050.000

3,50 2.550.000 8.925.000

2 Eka Ratnawati, SE/Ratih Permatasari Secretary 1 Person/Month 19,77 1.750.000 34.591.667

17,00 1.850.000 31.450.000

33,50 1.900.000 63.650.000

3,50 2.060.000 7.210.000

3 Sanindya Saputra/Ratih Pmansur Computer Operator -1 1 Person/Month 19,77 1.500.000 29.650.000

17,00 1.600.000 27.200.000

33,45 1.700.000 56.865.000

3,50 1.840.000 6.440.000

4 Astrid Tolibu/San Nindya Putra/Mansur Computer Operator -2 1 Person/Month 19,77 1.500.000 29.650.000

16,65 1.600.000 26.640.000

19,00 1.700.000 32.300.000

5 Sudarman/Neni/Patiha Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

6 Fitra Kaunang/Moh. Ikhsan/Sudarman/ Security-1 1 Person/Month 19,77 1.000.000 19.766.667

Takwim 17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

7 Ranu/Herdyianto/Ilham Security-2 1 Person/Month 19,77 1.000.000 19.766.667

16,65 1.100.000 18.315.000

19,00 1.150.000 21.850.000

1.2.6 732.180.000

1 Tirtawaty Nalole Ass Office Manager 1 Person/Month 19,77 2.000.000 39.533.333

17,00 2.200.000 37.400.000

33,50 2.300.000 77.050.000

3,50 2.550.000 8.925.000

2 Farah Diba Al-Chatib/Novita Pakaya Secretary 1 Person/Month 19,77 1.750.000 34.591.667

17,00 1.850.000 31.450.000

33,50 1.900.000 63.650.000

3,50 2.060.000 7.210.000

3 Alter Lasaruddin/Dedy Hariyanto/Rajak Sumardi Computer Operator -1 1 Person/Month 19,77 1.500.000 29.650.000

17,00 1.600.000 27.200.000

33,50 1.700.000 56.950.000

3,50 1.840.000 6.440.000

4 Firman Pakaya/Novita Pakaya/Riska S Djafar Computer Operator -2 1 Person/Month 19,77 1.500.000 29.650.000

17,00 1.600.000 27.200.000

19,00 1.700.000 32.300.000

5 Lina Pakaya Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

6 Fadli Hasan Security-1 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

7 Abdul Hakim Kunusa/Rahman Ilonu Security-2 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

19,00 1.150.000 21.850.000

1.2.7 2.765.844.000

I

1 Haeruddin Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

33,50 1.400.000 46.900.000

3,50 1.510.000 5.285.000

2 Suci Damayanti/Usman Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

II

1 Nasrah/Sudarto Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

23,50 1.400.000 32.900.000

2 Nurdin/Sudarto/Nurdin/Wahyuni Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

23,50 1.150.000 27.025.000

III

1 Ahmad Yakub Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

33,50 1.400.000 46.900.000

3,50 1.510.000 5.285.000

2 Hasriadi/Sabri Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

CITY COORDINATORS - 3 (PALOPO,SOUTH SULAWESI)

PROVINCE CENTRAL SULAWESI

PROVINCE GORONTALO

CITY COORDINATORS OFFICE

CITY COORDINATORS - 1 (MAKASSAR,SOUTH SULAWESI)

CITY COORDINATORS - 2 (SIDRAP,SOUTH SULAWESI)

Name Position Vol THP Amount (IDR)

NO. Person Number Unit

3,50 1.240.000 4.340.000

IV

1 Muh Ulil Amri Nurani/Ridwan Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

23,50 1.400.000 32.900.000

2 Ria Febriani/Muh. Yusuf Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

10,00 1.100.000 11.000.000

20,50 1.150.000 23.575.000

V

1 Elvira Yunita Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

23,50 1.400.000 32.900.000

2 Fakhrurozi/Edi Sudrajat/Faisal Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

23,50 1.150.000 27.025.000

VI

1 Arniyati Hasan Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

30,50 1.400.000 42.700.000

3,50 1.510.000 5.285.000

2 Nurhayati Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

30,50 1.150.000 35.075.000

3,50 1.240.000 4.340.000

1 Sudarto Computer Operator 1 Person/Month 15,00 1.250.000 18.750.000

2 Wahyuni Office Boy 1 Person/Month 15,00 1.000.000 15.000.000

VII

1 Murnihayan Hamid, SKM/Faiah Kesuma Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

33,50 1.400.000 46.900.000

3,50 1.510.000 5.285.000

2 Ernawati Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

VIII

1 Wiwi Sunarti/Ratiani Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

23,50 1.400.000 32.900.000

2 La Safar Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

23,50 1.150.000 27.025.000

1 Ferani Computer Operator 1 Person/Month 15,00 1.250.000 18.750.000

2 Indrawati Office Boy 1 Person/Month 15,00 1.000.000 15.000.000

IX

1 Ivanda L. J. Rompis/Randi Richi Wijaya Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

33,50 1.400.000 46.900.000

3,50 1.510.000 5.285.000

2 Feri Kusoy/Daniel Roring Potale Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

X

1 Satira Sigo Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

33,41 1.400.000 46.774.000

3,50 1.510.000 5.285.000

2 James JU Mandei/Rezki Ale Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,41 1.150.000 38.421.500

3,50 1.240.000 4.340.000

XI

1 Jefri Tooy Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

23,50 1.400.000 32.900.000

2 Livikel J Pesik/Melky Hikia Kaligis Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

23,50 1.150.000 27.025.000

XII

1 Leivan Pesik Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

23,31 1.400.000 32.634.000

2 Denny Warouw Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

23,32 1.150.000 26.818.000

XIII

1 Nurmila Passi Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

23,50 1.400.000 32.900.000

2 Lusye Octavia Langkay Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

23,41 1.150.000 26.921.500

XIV

1 Fatmawati/Nur Aisyah R Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

23,50 1.400.000 32.900.000

2 Yayu Asmara/Sarina/Ririn Anggun P Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

CITY COORDINATORS - 14 (POLIWALI MANDAR,WEST SULAWESI)

CITY COORDINATORS - 13 (KOTAMOBAGU,NORTH SULAWESI)

CITY COORDINATORS - 4 (WAJO,SOUTH SULAWESI)

CITY COORDINATORS - 5 (BULUKUMBA,SOUTH SULAWESI)

CITY COORDINATORS - 6 (GOWA,SOUTH SULAWESI)

CITY COORDINATORS PARE PARE - SOUTH SULAWESI

CITY COORDINATORS - 7 (KENDARI,SOUTH EAST SULAWESI)

CITY COORDINATORS - 8 (BAUBAU,SOUTH EAST SULAWESI)

CITY COORDINATORS KOLAKA - SOUTH EAST SULAWESI

CITY COORDINATORS - 9 (MANADO,NORTH SULAWESI)

CITY COORDINATORS - 10 (BITUNG,NORTH SULAWESI)

CITY COORDINATORS - 11 (TOMOHON,NORTH SULAWESI)

CITY COORDINATORS - 12 (MINAHASA,NORTH SULAWESI)

Name Position Vol THP Amount (IDR)

NO. Person Number Unit

16,00 1.100.000 17.600.000

23,50 1.150.000 27.025.000

1 Ririn Anggun Pancawati Computer Operator 1 Person/Month 15,00 1.250.000 18.750.000

2 Nur Aisyah R Office Boy 1 Person/Month 15,00 1.000.000 15.000.000

XV

1 San Atmajaya Saputra/Charles Edward/ Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

Eka Ratnawati 17,00 1.350.000 22.950.000

33,50 1.400.000 46.900.000

3,50 1.510.000 5.285.000

2 Wahyuni/Mohamad Tasrif Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

XVI

1 Awaludin Tilome Computer Operator 1 Person/Month 19,77 1.250.000 24.708.333

17,00 1.350.000 22.950.000

33,50 1.400.000 46.900.000

3,50 1.510.000 5.285.000

2 Erhan Djafar Office Boy 1 Person/Month 19,77 1.000.000 19.766.667

17,00 1.100.000 18.700.000

33,50 1.150.000 38.525.000

3,50 1.240.000 4.340.000

SUPPORTING STAFF TIM PERCEPATAN KOTA

I KOTA MAKASSAR

1 Tobe Name Ast OM 3,00 2.000.000 6.000.000

1 Tobe Name Secretary/Computer Operator 3,00 1.500.000 4.500.000

2 Tobe Name Office Boy 3,00 1.000.000 3.000.000

II KOTA KENDARI

1 Tobe Name Ast OM 3,00 2.000.000 6.000.000

1 Tobe Name Secretary/Computer Operator 3,00 1.500.000 4.500.000

2 Tobe Name Office Boy 3,00 1.000.000 3.000.000

III KOTA PALU

1 Tobe Name Ast OM 3,00 2.000.000 6.000.000

1 Tobe Name Secretary/Computer Operator 3,00 1.500.000 4.500.000

2 Tobe Name Office Boy 3,00 1.000.000 3.000.000

IV KOTA MANADO

1 Tobe Name Ast OM 3,00 2.000.000 6.000.000

1 Tobe Name Secretary/Computer Operator 3,00 1.500.000 4.500.000

2 Tobe Name Office Boy 3,00 1.000.000 3.000.000

V KOTA GORONTALO

1 Tobe Name Ast OM 3,00 2.000.000 6.000.000

1 Tobe Name Secretary/Computer Operator 3,00 1.500.000 4.500.000

2 Tobe Name Office Boy 3,00 1.000.000 3.000.000

50.207.599.810

CITY COORDINATORS MAJENE - SOUTH EAST SULAWESI

CITY COORDINATORS - 15 (PALU,CENTRAL SULAWESI)

CITY COORDINATORS - 16 (GORONTALO,GORONTALO)

TOTAL

Vol Rate Amount

(IDR)

2.1.1 IN PROVINCE 222.144.195

2.1.1.1FOR SPOTCHECK PROVINCE TO KELURAHAN (5 % x

Number of Kelurahan)time pers days 58.275.000

From Makassar to Selayar

Various Transport 6 1 - Trip 7 400.000 2.800.000 Fixed Rate

Local Transport 6 1 - Trip 7 100.000 700.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 14 175.000 2.450.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 21 50.000 1.050.000 Fixed Rate

From Makassar to Bulukumba, Bantaeng, Sinjai

Local Transport 6 1 - Trip 15 150.000 2.250.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 28 175.000 4.900.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 43 50.000 2.150.000 Fixed Rate

From Makassar to Gowa, Takalar, Jeneponto

Local Transport 6 1 - Trip 2 100.000 200.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 2 175.000 350.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 6 50.000 300.000 Fixed Rate

From Makassar to Pare-Pare, Pinrang

Local Transport 6 1 - Trip 15 100.000 1.500.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 28 175.000 4.900.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 43 50.000 2.150.000 Fixed Rate

From Makassar to Bone, Wajo

Local Transport 6 1 - Trip 16 100.000 1.600.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 26 175.000 3.850.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 40 50.000 2.000.000 Fixed Rate

From Makassar to Enrekang, Sidenreng Rappang

Local Transport 6 1 - Trip 6 100.000 600.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 10 175.000 1.750.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 16 50.000 800.000 Fixed Rate

From Makassar to Tana Toraja

Local Transport 6 1 - Trip 8 200.000 1.600.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 16 175.000 2.750.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 24 50.000 1.200.000 Fixed Rate

From Makassar to Palopo, Luwu Utara

Local Transport 6 1 - Trip 15 200.000 3.000.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 27 175.000 4.725.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 42 50.000 2.100.000 Fixed Rate

From Makassar to Maros, Makassar

Local Transport 6 1 - Trip 14 50.000 700.000 Fixed Rate

UJI PETIK OSP Sampai Dengan Juni 2018

From Makassar to Makassar 1 2 3 Trip 6 50.000 300.000 Fixed Rate

From Makassar to Palopo

Local Transport 1 2 Trip 2 200.000 400.000 Fixed Rate

Hotel Acomodation 2 2 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 2 3 Man/Days 6 50.000 300.000 Fixed Rate

From Makassar to Wajo

Local Transport 1 2 Trip 2 100.000 200.000 Fixed Rate

Hotel Acomodation 2 2 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 2 3 Man/Days 6 50.000 300.000 Fixed Rate

From Makassar to Bulukumba

Local Transport 1 2 Trip 2 150.000 300.000 Fixed Rate

Hotel Acomodation 2 2 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 2 3 Man/Days 6 50.000 300.000 Fixed Rate

Uji Petik Tematik

Local Transport 4 1 Trip 4 150.000 600.000 Fixed Rate

Hotel Acomodation 4 1 1 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 4 1 2 Man/Days 8 50.000 400.000 Fixed Rate

FOR COORDINATION/SUPERVISION PD TO OTHER PROVINCE (in Sulawesi) 10.794.595

Air Transport 5 1 1 trip 5 3.000.000 6.494.595 Ceiling Rate

Local Transport 5 1 1 Trip 5 200.000 1.000.000 Fixed Rate

2.1 DUTY TRAVEL EXPENSES PROVINCE SOUTH SULAWESI

No Description time pers days Unit

CONTRACT AMENDMENT NO. 24

REMARK

Vol Rate Amount

(IDR)

No Description time pers days Unit REMARK

Hotel Accommodation 5 1 2 Man/Days 6 300.000 1.800.000 Ceiling Rate

OSA [ Fixed ] 5 1 3 Man/Days 15 100.000 1.500.000 Fixed Rate

2.1.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 52.205.000

A. For City Coordinator and Assistance City Coordinator

Total 388 Kel x 50% x 6 6 97 day - 15.000 - Fixed Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel 73 50.000 3.530.000 Fixed Rate

B. For Ass. City Coordinator Infrastructure and FM in the city

(Total 388 Kel - 136 Kel luar kota) x 50% x 18 18 63 day - 15.000 - Fixed Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel 40 50.000 2.000.000 Fixed Rate

C. For City Coordinator Infrastructure and FM out of town

1 From Bulukumba to Selayar

Local Transport 24 2 - Trip 15 400.000 6.000.000 Fixed Rate

Acomodation 24 2 1 Man/Days 19 175.000 3.325.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 38 50.000 1.450.000 Fixed Rate

2 From Bulukumba to Bantaeng

Local Transport 24 2 - Trip 21 100.000 2.100.000 Fixed Rate

Acomodation 24 2 1 Man/Days 25 175.000 4.375.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 50 50.000 2.500.000 Fixed Rate

3 From Bulukumba to Sinjai

Local Transport 24 2 - Trip 16 100.000 1.600.000 Fixed Rate

Acomodation 24 2 1 Man/Days 20 175.000 3.500.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 40 50.000 1.500.000 Fixed Rate

4 From Gowa to Takalar

Local Transport 24 2 - Trip 3 100.000 300.000 Fixed Rate

Acomodation 24 2 1 Man/Days 7 175.000 1.225.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 14 50.000 700.000 Fixed Rate

5 From Gowa to Jeneponto

Local Transport 24 2 - Trip - 100.000 - Fixed Rate

Acomodation 24 2 1 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 8 50.000 400.000 Fixed Rate

6 From Bone to Wajo

Local Transport 24 2 - Trip - 100.000 - Fixed Rate

Acomodation 24 2 1 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 8 50.000 400.000 Fixed Rate

7 From Pare-Pare to Pinrang

Local Transport 24 2 - Trip - 100.000 - Fixed Rate

Acomodation 24 2 1 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 8 50.000 400.000 Fixed Rate

8 From Pare-pare to Sidenreng Rappang

Local Transport 24 2 - Trip 16 100.000 1.600.000 Fixed Rate

Acomodation 24 2 1 Man/Days 20 175.000 3.500.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 40 50.000 2.000.000 Fixed Rate

9 From Pare-pare to Enrekang

Local Transport 24 2 - Trip Fixed Rate

Acomodation 24 2 1 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 8 50.000 400.000 Fixed Rate

10 From Palopo to Tana Toraja

Local Transport 24 2 - Trip 6 150.000 900.000 Fixed Rate

Acomodation 24 2 1 Man/Days 10 175.000 1.750.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 20 50.000 1.000.000 Fixed Rate

11 From Palopo to Luwu Utara

Local Transport 24 2 - Trip - 150.000 - Fixed Rate

Acomodation 24 2 1 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 8 50.000 400.000 Fixed Rate

12 From Makassar Maros

Local Transport 24 2 - Trip - 50.000 - Fixed Rate

UJI PETIK KORKOT/ASKOT CM Mandiri Sampai Dengan Juni 2018

From Makassar to Makassar 1 6 2 Trip 12 50.000 600.000 Fixed Rate

From Gowa to Gowa 1 1 2 Trip 2 50.000 100.000 Fixed Rate

From Gowa to Bulukumba

Local Transport 1 1 Trip 1 150.000 150.000 Fixed Rate

Acomodation 1 1 Man/Days 1 175.000 175.000 Ceiling Rate

OSA [ Fixed ] 1 2 Man/Days 2 50.000 100.000 Fixed Rate

From Pare Pare to Pare Pare 1 2 2 Trip 4 50.000 200.000 Fixed Rate

From Palopo to Palopo 1 1 2 Trip 2 50.000 100.000 Fixed Rate

From Palopo to Wajo

Local Transport 1 1 Trip 1 150.000 150.000 Fixed Rate

Acomodation 1 1 Man/Days 1 175.000 175.000 Ceiling Rate

OSA [ Fixed ] 1 2 Man/Days 2 50.000 100.000 Fixed Rate

2.1.1.3 - FOR CB ACTIVITY BY ASKOT TO FASKEL

Vol Rate Amount

(IDR)

No Description time pers days Unit REMARK

From Bulukumba to Selayar

Local Transport 12 3 - Trip - 400.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Bulukumba to Bantaeng

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Bulukumba to Sinjai

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Gowa to Takalar

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Gowa to Jeneponto

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Bone to Wajo

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Pare-Pare to Pinrang

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Pare-pare to Sidenreng Rappang

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Pare-pare to Enrekang

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Palopo to Tana Toraja

Local Transport 12 3 - Trip - 150.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Palopo to Luwu Utara

Local Transport 12 3 - Trip - 150.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Makassar Maros

Local Transport 12 3 - Trip - 50.000 - Fixed Rate

2.1.1.4 34.250.000

From 14 City/Regency to MakassarNo of

City/RegTime Person Days

From Selayar

Various Transport 6 1 - Trip 3 400.000 1.200.000 Fixed Rate

Local Transport 6 1 - Trip 3 100.000 300.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 1 250.000 250.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 6 50.000 300.000 Fixed Rate

From Bulukumba

Local Transport 6 1 - Trip 5 150.000 750.000 Fixed Rate

Hotel Acomodation 6 2 1 Man/Days 7 250.000 1.750.000 Ceiling Rate

OSA [ Fixed ] 6 2 2 Man/Days 12 50.000 600.000 Fixed Rate

From Bantaeng

Local Transport 6 1 - Trip 4 150.000 600.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 5 250.000 1.250.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 10 50.000 500.000 Fixed Rate

From Sinjai

Local Transport 6 1 - Trip 3 150.000 450.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 2 250.000 500.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 6 50.000 300.000 Fixed Rate

From Gowa

Local Transport 6 1 - Trip 3 100.000 300.000 Fixed Rate

Hotel Acomodation 6 2 1 Man/Days 1 250.000 250.000 Ceiling Rate

OSA [ Fixed ] 6 2 2 Man/Days 5 50.000 250.000 Fixed Rate

From Takalar

FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING

Vol Rate Amount

(IDR)

No Description time pers days Unit REMARK

Local Transport 6 1 - Trip 2 100.000 200.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 2 250.000 500.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 4 50.000 200.000 Fixed Rate

From Jeneponto

Local Transport 6 1 - Trip 1 100.000 100.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 1 250.000 250.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 2 50.000 100.000 Fixed Rate

From Pare-Pare

Local Transport 6 1 - Trip 11 100.000 1.100.000 Fixed Rate

Hotel Acomodation 6 2 1 Man/Days 15 250.000 3.750.000 Ceiling Rate

OSA [ Fixed ] 6 2 2 Man/Days 24 50.000 1.200.000 Fixed Rate

From Pinrang

Local Transport 6 1 - Trip 4 100.000 400.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 2 250.000 500.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 8 50.000 400.000 Fixed Rate

From Bone

Local Transport 6 1 - Trip 4 100.000 400.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 3 250.000 750.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 8 50.000 400.000 Fixed Rate

From Wajo

Local Transport 6 1 - Trip 4 100.000 500.000 Fixed Rate

Hotel Acomodation 6 2 1 Man/Days 3 250.000 1.500.000 Ceiling Rate

OSA [ Fixed ] 6 2 2 Man/Days 12 50.000 600.000 Fixed Rate

From Enrekang

Local Transport 6 1 - Trip 1 100.000 100.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 1 250.000 250.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 2 50.000 100.000 Fixed Rate

From Sidenreng Rappang

Local Transport 6 1 - Trip 4 100.000 400.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 2 250.000 500.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 8 50.000 400.000 Fixed Rate

From Tana Toraja

Local Transport 6 1 - Trip 4 200.000 800.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 3 250.000 750.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 8 50.000 400.000 Fixed Rate

From Palopo

Local Transport 6 1 - Trip 11 200.000 2.200.000 Fixed Rate

Hotel Acomodation 6 2 1 Man/Days 16 250.000 4.000.000 Ceiling Rate

OSA [ Fixed ] 6 2 2 Man/Days 24 50.000 1.200.000 Fixed Rate

From Luwu Utara

Local Transport 6 1 - Trip 1 200.000 200.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 1 250.000 250.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 3 50.000 150.000 Fixed Rate

From Maros

Local Transport 14 14 2 - Trip 3 50.000 150.000 Fixed Rate

2.1.1.5FOR SEVERAL TRAINING & SPECIAL EVENT FROM

KABUPATEN TO MAKASSAR/CLASTER59.450.000

time pers days

Training for City Coordinators Assistants (Infrastructure,

Economic, Community Dev, MIS, Urban Planner)

Tranport for Askot Bulukumba 3 5 Trip 1 150.000 150.000 Fixed Rate

Tranport for Askot Gowa 3 5 Trip 7 100.000 700.000 Fixed Rate

Tranport for Askot Wajo 3 4 Trip 6 100.000 600.000 Fixed Rate

Tranport for Askot Pare-Pare 3 4 Trip 7 100.000 700.000 Fixed Rate

Tranport for Askot Palopo 3 9 Trip 7 200.000 1.400.000 Fixed Rate

Tranport for Askot Makassar 3 9 Trip - - -

Tranport for Askot Bantaeng 3 1 Trip 1 150.000 150.000 Fixed Rate

Tranport for Askot Bone 3 1 Trip 1 100.000 100.000 Fixed Rate

Tranport for Askot Sidenreng Rappang 3 1 Trip 1 100.000 100.000 Fixed Rate

Tranport for Askot Tana Toraja 3 1 Trip 1 200.000 200.000 Fixed Rate

Tranport for Askot Luwu Utara 3 1 Trip - 200.000 - Fixed Rate

Tranport for Askot Enrekang 3 1 Trip - 100.000 - Fixed Rate

For Training/Consolidation

Transport for Korkot/Askot Selayar on OSP Consolidation 14 1 Trip - 400.000 - Fixed Rate

Transport for Korkot/Askot Bulukumba, Bantaeng, Sinjai on

OSP Consolidation14 3 Trip - 150.000 -

Fixed Rate

Transport for Korkot/Askot Gowa, Takalar, Jeneponto on OSP

Consolidation14 3 Trip - 100.000 -

Fixed Rate

Vol Rate Amount

(IDR)

No Description time pers days Unit REMARK

Transport for Korkot/Askot Bone, Wajo on OSP Consolidation 14 2 Trip - 100.000 - Fixed Rate

Transport for Korkot/Askot Enrekabg, Sidenreng Rappang on

OSP Consolidation14 2 Trip - 100.000 -

Fixed Rate

Transport for Korkot/Askot Pare-Pare, Pinrang on OSP

Consolidation14 2 Trip - 100.000 -

Fixed Rate

Transport for Korkot/Askot Palopo, Tana Toraja, Luwu Utara on

OSP Consolidation14 3 Trip - 200.000 -

Fixed Rate

Transport for Korkot/Askot Maros on OSP Consolidation 14 1 Trip - 50.000 - Fixed Rate

- - - Fixed Rate

Advance Training/Couching PLPBK for City Coordinator

Assistant UP3 10 Trip - 100.000 -

Fixed Rate

Special Training for Kelurahan Facilitators (Faskel): - - -

Transport for SF, FT, FE, FS Selayar 3 2 Trip - 400.000 - Fixed Rate

Transport for SF, FT, FE, FS Bulukumba, Bantaeng, Sinjai 3 18 Trip - 150.000 - Fixed Rate

Transport for SF, FT, FE, FS Gowa, Takalar, Jeneponto 3 29 Trip - 100.000 - Fixed Rate

Transport for SF, FT, FE, FS Bone, Wajo 3 17 Trip - 100.000 - Fixed Rate

Transport for SF, FT, FE, FS Enrekang, Sidenreng Rappang 3 22 Trip - 100.000 - Fixed Rate

Transport for SF, FT, FE, FS Pare-Pare, Pinrang 3 20 Trip - 100.000 - Fixed Rate

Transport for SF, FT, FE, FS Palopo, Tana Toraja, Luwu Utara 3 23 Trip - 200.000 - Fixed Rate

Transport for SF, FT, FE, FS Maros 3 5 Trip - 50.000 - Fixed Rate

Special Event (by request)

From Selayar

Various Transport 2 2 - Trip 12 400.000 4.800.000 Fixed Rate

Local Transport 2 2 - Trip 3 100.000 300.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Bulukumba

Local Transport 2 2 - Trip 15 150.000 2.250.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Bantaeng

Local Transport 2 2 - Trip 15 150.000 2.250.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Sinjai

Local Transport 2 2 - Trip 15 150.000 2.250.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Gowa

Local Transport 2 2 - Trip 55 100.000 5.500.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Takalar

Local Transport 2 2 - Trip - 100.000 - Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Jeneponto

Local Transport 2 2 - Trip - 100.000 - Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Pare-Pare

Local Transport 2 2 - Trip 44 100.000 4.400.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Pinrang

Local Transport 2 2 - Trip 10 100.000 1.000.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Bone

Local Transport 2 2 - Trip 15 100.000 1.500.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Wajo

Local Transport 2 2 - Trip 36 100.000 3.600.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Enrekang

Local Transport 2 2 - Trip - 100.000 - Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

Vol Rate Amount

(IDR)

No Description time pers days Unit REMARK

From Sidenreng Rappang

Local Transport 2 2 - Trip 17 100.000 1.700.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Tana Toraja

Local Transport 2 2 - Trip 12 200.000 2.400.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Palopo

Local Transport 2 2 - Trip 46 200.000 9.200.000 Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Luwu Utara

Local Transport 2 2 - Trip - 200.000 - Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Maros

Local Transport 2 2 1 Trip 14 50.000 700.000 Fixed Rate

1 To Claster Palopo

From Sindereng Rappang

Local Transport 13 100.000 1.300.000 Fixed Rate

From Pinrang

Local Transport 4 100.000 400.000 Fixed Rate

From Pare Pare

Local Transport 29 100.000 2.900.000 Fixed Rate

From Toraja Utara

Local Transport 6 100.000 600.000 Fixed Rate

2 To Claster Bone

From Sinjai

Local Transport 10 100.000 1.000.000 Fixed Rate

From Wajo

Local Transport 23 100.000 2.300.000 Fixed Rate

From Bulukumba

Local Transport 10 100.000 1.000.000 Fixed Rate

From Selayar

Local Transport 6 100.000 600.000 Fixed Rate

Various Transport 6 400.000 2.400.000 Fixed Rate

From Bantaeng

Local Transport 10 100.000 1.000.000 Fixed Rate

2.1.1.6FROM PROVINCE TO REGIONAL FOR WORKSHOP &

COORDINATION MEETING AT OC7.169.600

From Kota Makassar to Manado (Sulawesi Utara)

Local Tranport 2 100.000 200.000 Fixed Rate

Air Tranport 2 2.500.000 2.994.000 Ceiling Rate

OSA [ Fixed ] 6 100.000 600.000 Fixed Rate

From Kota Makassar to Kendari (Sulawesi Tenggara)

Local Tranport 3 100.000 300.000 Fixed Rate

Air Tranport 3 1.500.000 2.175.600 Ceiling Rate

OSA [ Fixed ] 9 100.000 900.000 Fixed Rate

2.1.2 TO JAKARTA 225.296.800

2.1.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 17.293.300

Air Transport 6 5 - Trip 5 2.500.000 11.938.500 Ceiling Rate

In land Transport in Jakarta 6 5 - Trip 5 200.000 1.000.000 Fixed Rate

OSA [ Fixed ] 6 5 4 Man/Days 17 100.000 1.700.000 Fixed Rate

TOT Pemandu Nasonal Korkot / Askot CD Mandiri

Air Transport 1 14 Trip 1 2.500.000 2.154.800 Ceiling Rate

In land Transport in Jakarta 1 14 Trip 1 200.000 200.000 Fixed Rate

OSA [ Fixed ] 1 14 8 Man/Days 3 100.000 300.000 Fixed Rate

TOT Pelatihan Program Lanjutan

Air Transport 1 2 Trip - 2.500.000 - Ceiling Rate

In land Transport in Jakarta 1 2 Trip - 200.000 - Fixed Rate

OSA [ Fixed ] 1 2 4 Man/Days - 100.000 - Fixed Rate

2.1.2.2 FOR EGM TO JAKARTA etc 180.890.500

Air Transport

Vol Rate Amount

(IDR)

No Description time pers days Unit REMARK

Coordination Meeting for PD & TL 5 2 - Trip 11 2.500.000 20.815.400

EGM Spec [TA]/Sub Spec [Sub TA] Training 5 3 - Trip 6 2.500.000 13.133.900

EGM Socilization Specialist 5 1 - Trip 4 2.500.000 9.403.400

EGM Spec [TA]/Sub Spec MK/Sub Spec RLF 5 3 - Trip 8 2.500.000 18.893.800

EGM Spec [TA]/Sub Spec INFRA/Sub Spec Safeguard 5 3 - Trip 6 2.500.000 13.543.400

EGM Spec [TA]/Sub Spec Monev /Sub Spec Legal HCU 5 3 - Trip 9 2.500.000 19.523.300

EGM Spec [TA]/Sub Spec SIM 5 2 - Trip 6 2.500.000 11.903.700

EGM Spec [TA] Local Goverment 4 1 - Trip 4 2.500.000 9.046.700

EGM Spec [TA] Urban Planner 4 1 - Trip 5 2.500.000 11.326.900

In land Transport in Jakarta Trip 63 200.000 12.400.000 Fixed Rate

Hotel Accommodation 5 19 3 Man/Days 60 300.000 11.400.000 Ceiling Rate

OSA [ Fixed ] 5 19 4 Man/Days 295 100.000 29.500.000 Fixed Rate

2.1.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 27.113.000

Air Transport 14 3 - trip 8 2.500.000 18.613.000 Ceiling Rate

In land Transport in Jakarta 14 3 - Trip 8 200.000 1.500.000 Fixed Rate

Hotel Accommodation 14 3 4 Man/Days 12 300.000 3.600.000 Ceiling Rate

OSA [ Fixed ] 14 3 4 Man/Days 34 100.000 3.400.000 Fixed Rate

FOR COORDINATION MEETING CITY COORDINATOR TO JAKARTA (by request)

Air Transport 1 6 - trip - 2.500.000 - Ceiling Rate

In land Transport in Jakarta 1 6 - Trip - 200.000 - Fixed Rate

Hotel Accommodation 1 6 3 Man/Days - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 6 4 Man/Days - 100.000 - Fixed Rate

2.1.3 TO OTHER 13.147.600

FOR COORDINATION MEETING (by request) 13.147.600

Air Transport 4 3 1 trip 4 4.500.000 11.147.600 Ceiling Rate

In land Transport 4 3 1 Trip 4 200.000 800.000 Fixed Rate

Hotel Accommodation 4 3 2 Man/Days - 300.000 - Ceiling Rate

OSA [ Fixed ] 4 3 3 Man/Days 12 100.000 1.200.000 Fixed Rate

FOR LOKAKARYA NASIONAL

Air Transport - 2.500.000 - Ceiling Rate

In land Transport - 200.000 - Fixed Rate

Hotel Accommodation - 300.000 - Ceiling Rate

OSA [ Fixed ] - 100.000 - Fixed Rate

COODINATION FOR TIM PERCEPATAN KOTA

Local Transport - 300.000 - Fixed Rate

Local Transport Peserta Pelatihan perencanaan bagi TAPP - 100.000 - Fixed Rate

2.1.4 ACTIVITIES TO JAKARTA 2017 124.434.000

1. RAKOR TEAM LEADER AND SPECIALIST OSP

Air Transport 1 7 1 7 4.500.000 31.500.000 Ceiling Rate

In land Transport 1 7 1 7 200.000 1.400.000 Fixed Rate

Hotel Accommodation 1 7 3 14 300.000 4.200.000 Ceiling Rate

OSA [ Fixed ] 1 7 4 21 100.000 2.100.000 Fixed Rate

2. ToT PEMANDU NASIONAL

Air Transport 1 11 1 17 4.500.000 55.534.000 Ceiling Rate

In land Transport 1 11 1 17 200.000 3.400.000 Fixed Rate

Hotel Accommodation 1 11 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 11 9 125 100.000 12.500.000 Fixed Rate

3. ToT PEMANDU SIM

Air Transport 1 2 1 - 4.500.000 - Ceiling Rate

In land Transport 1 2 1 - 200.000 - Fixed Rate

Hotel Accommodation 1 2 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 2 5 - 100.000 - Fixed Rate

ToT PEMANDU NASIONAL KE GORONTALO

Air Transport 1 6 1 6 1.500.000 9.000.000 Ceiling Rate

In land Transport 1 6 1 6 200.000 1.200.000 Fixed Rate

Hotel Accommodation 1 6 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 6 6 36 100.000 3.600.000 Fixed Rate

4. KONSOLIDASI HASIL KEGIATAN LOKASI PRIORITAS

Air Transport 1 9 1 - 4.500.000 - Ceiling Rate

In land Transport 1 9 1 - 200.000 - Fixed Rate

Hotel Accommodation 1 9 3 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 9 4 - 100.000 - Fixed Rate

2.1.5 ACTIVITIES TO JAKARTA 2018 92.400.000

1. BY REQUEAST

Ceiling Rate

Vol Rate Amount

(IDR)

No Description time pers days Unit REMARK

Air Transport 1 1 1 4.500.000 4.500.000 Ceiling Rate

In land Transport 1 1 1 200.000 200.000 Fixed Rate

Hotel Accommodation 1 1 3 3 300.000 900.000 Ceiling Rate

OSA [ Fixed ] 1 1 4 4 100.000 400.000 Fixed Rate

2. ToT and EGM

Air Transport 1 16 16 4.500.000 72.000.000 Ceiling Rate

In land Transport 1 16 16 200.000 3.200.000 Fixed Rate

Hotel Accommodation 1 16 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 16 7 112 100.000 11.200.000 Fixed Rate

3. TRAINING OF TRAINER KHUSUS SIM

Air Transport 1 - - 4.500.000 - Ceiling Rate

In land Transport 1 - - 200.000 - Fixed Rate

Hotel Accommodation 1 - - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 - 4 - 100.000 - Fixed Rate

677.422.595 TOTAL

Vol Rate Amount (IDR)

2.2.1 IN PROVINCE 71.753.200

2.2.1.1FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x Number of

Kelurahan)time pers days 14.450.000

From Kota Mamuju To Polewali Mandar

Tranport 6 1 - Trip 8 150.000 1.200.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 20 150.000 3.000.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 30 50.000 1.500.000 Fixed Rate

From Kota Mamuju To Majene

Tranport 6 1 - Trip 13 100.000 1.300.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 30 150.000 4.500.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 45 50.000 2.250.000 Fixed Rate

UJI PETIK OSP Sampai Dengan Juni 2018

From Majene to Majene 1 2 3 Man/Days 6 50.000 300.000 Fixed Rate

From Kota Mamuju To Polewali Mandar

Tranport 1 1 Trip 1 150.000 150.000 Fixed Rate

Hotel Acomodation 1 1 1 Man/Days 1 150.000 150.000 Ceiling Rate

OSA [ Fixed ] 1 1 2 Man/Days 2 50.000 100.000 Fixed Rate

2.2.1.2 23.860.000

A. For City Coordinator and Assistance City Coordinator

Total 22 Kel x 50% x 6 6 6 day - 15.000 - Fixed Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel 29 50.000 1.060.000 Fixed Rate

B. For Ass. City Coordinator Infrastructure and FM in the city

(Total 22 Kel - 13 Kel luar kota) x 50% x 18 18 2 day - 15.000 - Fixed Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel 51 50.000 2.550.000 Fixed Rate

C. For City Coordinator Infrastructure and FM out of town

From Kota Mamuju To Polewali Mandar

Local Tranport 24 2 - Trip - 150.000 - Fixed Rate

Hotel Acomodation 24 2 1 Man/Days 4 150.000 600.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 8 50.000 400.000 Fixed Rate

From Kota Mamuju To Majene

Tranport 24 2 - Trip 45 100.000 4.500.000 Fixed Rate

Local Tranport 24 2 2 Man/Days 57 150.000 8.550.000 Ceiling Rate

OSA [ Fixed ] 24 2 3 Man/Days 106 50.000 5.300.000 Fixed Rate

From Kota Polewali Mandar to Mamuju

Local Tranport - 150.000 - Fixed Rate

Hotel Acomodation - 150.000 - Ceiling Rate

OSA [ Fixed ] - 50.000 - Fixed Rate

From Kota Polewali Mandar to Mamuju

Local Tranport 2 100.000 200.000 Fixed Rate

Hotel Acomodation 4 150.000 300.000 Ceiling Rate

OSA [ Fixed ] 6 50.000 300.000 Fixed Rate

UJI PETIK KORKOT/ASKOT CM Mandiri Sampai Dengan Juni 2018

From Majene to Majene 1 1 2 2 50.000 100.000 Fixed Rate

2.2.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL -

From Kota Mamuju To Polewali Mandar

Local Tranport 12 3 - Trip - 150.000 - Fixed Rate

Hotel Acomodation 12 3 1 Man/Days - 150.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Kota Mamuju To Majene

Tranport 12 3 - Trip - 100.000 - Fixed Rate

Local Tranport 12 3 2 Man/Days - 150.000 - Ceiling Rate

OSA [ Fixed ] 12 3 3 Man/Days - 50.000 - Fixed Rate

2.2.1.4FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION

MEETING6.450.000

From Kota Mamuju To Majene

Tranport 14 2 - Trip 7 100.000 700.000 Fixed Rate

Hotel Acomodation 14 2 1 Man/Days 15 150.000 2.250.000 Ceiling Rate

OSA [ Fixed ] 14 2 2 Man/Days 54 50.000 2.700.000 Fixed Rate

From Kota Mamuju To Polewali Mandar

Tranport 14 2 - Trip 2 150.000 300.000 Fixed Rate

Hotel Acomodation 14 2 1 Man/Days 2 150.000 300.000 Ceiling Rate

OSA [ Fixed ] 14 2 2 Man/Days 4 50.000 200.000 Fixed Rate

CONTRACT AMENDMENT NO. 24REMARK

SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM

time persDescription

2.2 DUTY TRAVEL EXPENSES PROVINCE WEST SULAWESI

days UnitNo

Vol Rate Amount (IDR)

REMARKtime persDescription days UnitNo

2.2.1.5FROM PROVINCE TO REGIONAL FOR WORKSHOP &

COORDINATION MEETING AT OC21.443.200

Workshop OC / Coordination Meeting at OC

From Kota Mamuju to Makasar

Local Tranport 5 9 - Trip 17 100.000 1.700.000 Fixed Rate

Air Tranport 5 9 - Trip 18 900.000 14.458.800 Ceiling Rate

OSA [ Fixed ] 5 9 2 Man/Days 41 100.000 3.100.000 Fixed Rate

From Kota Mamuju to Manado (Sulawesi Utara)

Local Tranport - 100.000 - Fixed Rate

Air Tranport - 2.500.000 - Ceiling Rate

OSA [ Fixed ] - 100.000 - Fixed Rate

From Kota Mamuju to Kendari (Sulawesi Tenggara)

Local Tranport 2 100.000 200.000 Fixed Rate

Air Tranport 2 2.000.000 1.384.400 Ceiling Rate

OSA [ Fixed ] 6 100.000 600.000 Fixed Rate

2.2.1.6FOR SEVERAL TRAINING & SPECIAL EVENT FROM

KABUPATEN TO KOTA MAJENE5.550.000

Training for City Coordinators Assistants (Infrastructure, Economic,

Community Dev, MIS, Urban Planner)

Transport for Askot Majene to Kota Mamuju 6 1 - Trip - 100.000 - Fixed Rate

Transport for Askot Polewali Mandar to Kota Mamuju 6 6 - Trip - 150.000 - Fixed Rate

Special Event (by request)

From Majene to Kota Mamuju

Tranport 2 1 - Trip 18 100.000 1.800.000 Fixed Rate

Hotel Acomodation 2 2 2 Man/Days - 150.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixed Rate

From Polewali Mandar to Kota Majene

Tranport 2 2 - Trip 25 150.000 3.750.000 Fixed Rate

Hotel Acomodation 2 2 2 Man/Days - 150.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixed Rate

2.2.2 TO JAKARTA 160.447.500

2.2.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 27.972.400

Air Transport 6 3 - Trip 8 2.400.000 18.617.600 Ceiling Rate

In land Travel in Jakarta 6 3 - Trip 8 200.000 1.600.000 Ceiling Rate

OSA [ Fixed ] 6 3 4 Man/Days 51 100.000 5.100.000 Fixed Rate

TOT Pemandu Nasonal Korkot / Askot CD Mandiri

Air Transport 1 2 Trip 1 2.400.000 2.154.800 Ceiling Rate

In land Transport in Jakarta 1 2 Trip 1 200.000 200.000 Fixed Rate

OSA [ Fixed ] 1 2 8 Man/Days 3 100.000 300.000 Fixed Rate

TOT Pelatihan Program Lanjutan

Air Transport 1 2 Trip - 2.400.000 - Ceiling Rate

In land Transport in Jakarta 1 2 Trip - 200.000 - Fixed Rate

OSA [ Fixed ] 1 2 4 Man/Days - 100.000 - Fixed Rate

2.2.2.2 FOR EGM TO JAKARTA 106.071.100

Air Transport

Coordination Meeting for PD & TL 5 1 - Trip 5 2.400.000 10.907.800

1 EGM Spec Training 5 1 - Trip 5 2.400.000 11.140.800

2 EGM Spec MK/ RLF 5 1 - Trip 6 2.400.000 13.331.700

3 EGM Spec INFRA 5 1 - Trip 6 2.400.000 13.204.000

4 EGM Spec SIM 5 1 - Trip 6 2.400.000 13.854.800

5 EGM Spec Local Goverment 5 1 - Trip 4 2.400.000 9.082.000

6 EGM Spec Urban Planner 5 1 - Trip 1 2.400.000 2.400.000

In land Transport in Jakarta Trip 36 200.000 7.200.000 Ceiling Rate

Hotel Acomodation 5 7 3 Man/Days 39 300.000 7.650.000 Ceiling Rate

OSA [ Fixed ] 5 7 4 Man/Days 173 100.000 17.300.000 Fixed Rate

2.2.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 12.500.000

Air Transport 7 3 - Man/Days 4 2.400.000 9.600.000 Ceiling Rate

In land Transport in Jakarta 7 3 - Trip 4 200.000 900.000 Fixed Rate

Hotel Acomodation 7 3 3 Man/Days 1 300.000 300.000 Ceiling Rate

OSA [ Fixed ] 7 3 4 Man/Days 17 100.000 1.700.000 Fixed Rate

FOR COORDINATION MEETING CITY COORDINATOR TO JAKARTA (by request)

Air Transport 1 1 - Man/Days - 2.400.000 - Ceiling Rate

In land Transport in Jakarta 1 1 - Trip - 200.000 - Fixed Rate

Hotel Acomodation 1 1 3 Man/Days - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 1 4 Man/Days - 100.000 - Fixed Rate

2.2.3 TO OTHER 13.904.000

FOR COORDINATION MEETING (by request) 13.904.000 -

Air Transport 4 1 1 Man/Days 3 4.400.000 12.404.000 Ceiling Rate

In land Transport 4 1 1 Trip 3 200.000 600.000 Fixed Rate

Hotel Acomodation 4 1 2 Man/Days - 300.000 - Ceiling Rate

Ceiling Rate

Vol Rate Amount (IDR)

REMARKtime persDescription days UnitNo

OSA [ Fixed ] 4 1 3 Man/Days 9 100.000 900.000 Fixed Rate

FOR LOKAKARYA NASIONAL

Air Transport - 2.400.000 - Ceiling Rate

In land Transport - 200.000 - Fixed Rate

Hotel Accommodation - 300.000 - Ceiling Rate

OSA [ Fixed ] - 100.000 - Fixed Rate

2.2.4 ACTIVITIES TO JAKARTA 2017 17.500.000 -

1. RAKOR TEAM LEADER AND SPECIALIST OSP

Air Transport 1 5 1 5 2.400.000 12.000.000 Ceiling Rate

In land Transport 1 5 1 5 200.000 1.000.000 Fixed Rate

Hotel Accommodation 1 5 3 10 300.000 3.000.000 Ceiling Rate

OSA [ Fixed ] 1 5 4 15 100.000 1.500.000 Fixed Rate

2. ToT PEMANDU SIM

Air Transport 1 2 1 - 2.400.000 - Ceiling Rate

In land Transport 1 2 1 - 200.000 - Fixed Rate

Hotel Accommodation 1 2 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 2 5 - 100.000 - Fixed Rate

3. KONSOLIDASI HASIL KEGIATAN LOKASI PRIORITAS

Air Transport 1 5 1 - 2.400.000 - Ceiling Rate

In land Transport 1 5 1 - 200.000 - Fixed Rate

Hotel Accommodation 1 5 3 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 5 4 - 100.000 - Fixed Rate

2.2.5 ACTIVITIES TO JAKARTA 2018 39.100.000

1. BY REQUEST

Air Transport 1 1 1 2.400.000 2.400.000 Ceiling Rate

In land Transport 1 1 1 200.000 200.000 Fixed Rate

Hotel Accommodation 1 1 3 3 300.000 900.000 Ceiling Rate

OSA [ Fixed ] 1 1 4 4 100.000 400.000 Fixed Rate

2. ToT and EGM

Air Transport 1 8 8 2.400.000 19.200.000 Ceiling Rate

In land Transport 1 8 8 200.000 1.600.000 Fixed Rate

Hotel Accommodation 1 8 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 8 7 56 100.000 5.600.000 Fixed Rate

3. TRAINING OF TRAINER KHUSUS SIM TO MAKASSAR

Air Transport 1 4 4 1.500.000 6.000.000 Ceiling Rate

In land Transport 1 4 4 200.000 800.000 Fixed Rate

Hotel Accommodation 1 4 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 4 5 20 100.000 2.000.000 Fixed Rate

288.800.700 TOTAL

Vol Rate Amount (IDR)

2.3.1 IN PROVINCE 104.306.400

2.3.1.1FOR SPOTCHECK PROVINCE TO KELURAHAN (5 % x

Number of Kelurahan)time pers days 31.440.000

From Kendari to Muna

Local Transport 6 1 - Trip 11 100.000 1.050.000 Fixed Rate

Various Transport 6 1 - Trip 11 500.000 5.400.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 20 175.000 3.375.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 29 50.000 1.450.000 Fixed Rate

From Kendari to Bau-Bau

Local Transport 6 1 - Trip 12 100.000 1.050.000 Fixed Rate

Various Transport 6 1 - Trip 12 500.000 5.340.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 23 175.000 3.650.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 34 50.000 1.700.000 Fixed Rate

From Kendari to Buton

Local Transport 6 1 - Trip - 100.000 - Fixed Rate

Various Transport 6 1 - Trip - 750.000 - Fixed Rate

Hotel Acomodation 6 1 2 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days - 50.000 - Fixed Rate

From Kendari to Kolaka

Local Transport 6 1 - Trip 7 150.000 1.050.000 Fixed Rate

Hotel Acomodation 6 1 1 Man/Days 11 175.000 1.825.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 17 50.000 850.000 Fixed Rate

From Kendari to Konawe

Local Transport 6 1 - Trip - 100.000 - Fixed Rate

Hotel Acomodation 6 1 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days - 50.000 - Fixed Rate

From Kendari to Kolaka Utara

Local Transport 6 1 - Trip - 300.000 - Fixed Rate

Hotel Acomodation 6 1 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days - 50.000 - Fixed Rate

From Kendari to Bombana

Local Transport 6 1 - Trip - 300.000 - Fixed Rate

Hotel Acomodation 6 1 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days - 50.000 - Fixed Rate

From Kendari to Wakatobi

Local Transport Trip - 300.000 - Fixed Rate

Various Transport Trip - 1.500.000 - Ceiling Rate

Hotel Acomodation Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] Man/Days - 50.000 - Fixed Rate

UJI PETIK OSP Sampai Dengan Juni 2018

From Kendari to Kendari 1 2 3 Man/Days 6 50.000 300.000 Fixed Rate

From Kendari to Muna

Local Transport 1 2 - Trip 2 100.000 200.000 Fixed Rate

Various Transport 1 2 - Trip 2 500.000 1.000.000 Fixed Rate

Hotel Acomodation 1 2 2 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 1 2 3 Man/Days 6 50.000 300.000 Fixed Rate

Uji Petik Tematik

Local Transport 1 2 - Trip 2 100.000 200.000 Fixed Rate

Various Transport 1 2 - Trip 2 500.000 1.000.000 Fixed Rate

Hotel Acomodation 1 2 2 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 1 2 3 Man/Days 6 50.000 300.000 Fixed Rate

2.3.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 10.610.000

A. For City Coordinator and Assistance City Coordinator

Total 198 Kel x 50% x 6 6 50 day - 15.000 - Fixed Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel 26 50.000 565.000 Fixed Rate

B. For Ass. City Coordinator Infrastructure and FM in the city

(Total 198 Kel - 93 Kel luar kota) x 50% x 18 18 26 day - 15.000 - Fixed Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel 13 50.000 195.000 Fixed Rate

C. For City Coordinator Infrastructure and FM out of town

From Kendari to Kolaka

Local Transport 24 2 - Trip 10 150.000 1.500.000 Fixed Rate

Acomodation 24 2 1 Man/Days 10 175.000 1.750.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 10 50.000 500.000 Fixed Rate

From Kendari to Konawe

Local Transport 24 2 - Trip - 100.000 - Fixed Rate

Acomodation 24 2 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days - 50.000 - Fixed Rate

2.3 DUTY TRAVEL EXPENSES PROVINCE SOUTH EAST SULAWESI

No Description time pers REMARK

CONTRACT AMENDMENT NO. 24days Unit

Vol Rate Amount (IDR)

No Description time pers REMARKdays Unit

From Kendari to Kolaka Utara

Local Transport 24 2 - Trip - 300.000 - Fixed Rate

Acomodation 24 2 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days - 50.000 - Fixed Rate

From Kendari to Bombana

Local Transport 24 2 - Trip - 300.000 - Fixed Rate

Acomodation 24 2 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days - 50.000 - Fixed Rate

From Kota Bau-Bau to Muna

Local Transport 24 2 - Trip 4 100.000 400.000 Fixed Rate

Various Transport 24 2 - Trip 4 500.000 2.000.000 Fixed Rate

Acomodation 24 2 1 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 4 50.000 200.000 Fixed Rate

From Kota Bau-Bau to Buton

Local Transport 24 2 - Trip - 100.000 - Fixed Rate

Various Transport 24 2 - Trip - 500.000 - Fixed Rate

Acomodation 24 2 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days - 50.000 - Fixed Rate

From Kendari to Wakatobi

Local Transport - 100.000 - Fixed Rate

Various Transport - 1.500.000 - Fixed Rate

Hotel Acomodation - 175.000 - Ceiling Rate

OSA [ Fixed ] - 50.000 - Fixed Rate

UJI PETIK KORKOT/ASKOT CM Mandiri Sampai Dengan Juni 2018

From Kendari to Kendari 1 2 3 Man/Days 6 50.000 300.000 Fixed Rate

From Kendari to Muna

Local Transport 1 2 - Trip 2 100.000 200.000 Fixed Rate

Various Transport 1 2 - Trip 2 500.000 1.000.000 Fixed Rate

Hotel Acomodation 1 2 2 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 1 2 3 Man/Days 6 50.000 300.000 Fixed Rate

From Kolaka to Kolaka 1 2 3 Man/Days 6 50.000 300.000 Fixed Rate

2.3.1.3 -

From Kendari to Kolaka

Local Transport 12 3 - Trip - 150.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Kendari to Konawe

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Kendari to Kolaka Utara

Local Transport 12 3 - Trip - 300.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Kendari to Bombana

Local Transport 12 3 - Trip - 300.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Kota Bau-Bau to Muna

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Various Transport 12 3 - Trip - 500.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Fixed Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Ceiling Rate

From Kota Bau-Bau to Buton

Local Transport 12 3 - Trip - 100.000 - Fixed Rate

Various Transport 12 3 - Trip - 500.000 - Fixed Rate

Acomodation 12 3 1 Man/Days - 175.000 - Fixed Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Ceiling Rate

2.3.1.4 11.100.000

No of

City/RegTime Person Days

From Muna

Local Transport 14 1 - Trip 2 100.000 200.000 Fixed Rate

Various Transport 14 1 - Trip 2 500.000 1.000.000 Fixed Rate

Hotel Acomodation 14 1 2 Man/Days 3 250.000 750.000 Fixed Rate

OSA [ Fixed ] 14 1 3 Man/Days 10 50.000 500.000 Ceiling Rate

From Bau-Bau

Local Transport 14 1 - Trip 3 100.000 300.000 Fixed Rate

Various Transport 14 1 - Trip 3 500.000 1.500.000 Fixed Rate

Hotel Acomodation 14 1 2 Man/Days 4 250.000 1.000.000 Fixed Rate

FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING

FOR CB ACTIVITY BY ASKOT TO FASKEL

Vol Rate Amount (IDR)

No Description time pers REMARKdays Unit

OSA [ Fixed ] 14 1 3 Man/Days 11 50.000 550.000 Ceiling Rate

From Buton

Local Transport 14 1 - Trip - 100.000 - Fixed Rate

Various Transport 14 1 - Trip - 750.000 - Fixed Rate

Hotel Acomodation 14 1 2 Man/Days - 250.000 - Fixed Rate

OSA [ Fixed ] 14 1 3 Man/Days - 50.000 - Ceiling Rate

From Kolaka

Local Transport 14 1 - Trip 6 150.000 900.000 Fixed Rate

Hotel Acomodation 14 1 1 Man/Days 13 250.000 3.250.000 Ceiling Rate

OSA [ Fixed ] 14 1 2 Man/Days 23 50.000 1.150.000 Fixed Rate

14

From Konawe

Local Transport 14 1 - Trip - 100.000 - Fixed Rate

Hotel Acomodation 14 1 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 14 1 2 Man/Days - 50.000 - Fixed Rate

From Kolaka Utara

Local Transport 14 1 - Trip - 300.000 - Fixed Rate

Hotel Acomodation 14 1 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 14 1 2 Man/Days - 50.000 - Fixed Rate

From Bombana

Local Transport 14 1 - Trip - 300.000 - Fixed Rate

Hotel Acomodation 14 1 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 14 1 2 Man/Days - 50.000 - Fixed Rate

2.3.1.5FROM PROVINCE TO REGIONAL FOR WORKSHOP &

COORDINATION MEETING AT OC27.906.400

time pers days

Workshop OC / Coordination Meeting at OC

From Kota Kendari to Makasar

Local Tranport 5 11 - 26 100.000 2.600.000 Fixed Rate

Air Tranport 5 11 - 27 1.000.000 19.106.400 Ceiling Rate

OSA [ Fixed ] 5 11 2 62 100.000 6.200.000 Fixed Rate

From Kota Kendari to Manado (Sulawesi Utara)

Local Tranport - 100.000 - Fixed Rate

Air Tranport - 3.500.000 - Ceiling Rate

OSA [ Fixed ] - 100.000 - Fixed Rate

2.3.1.6FOR SEVERAL TRAINING & SPECIAL EVENT FROM

KABUPATEN TO KENDARI23.250.000

time pers days

Training for City Coordinators Assistants (Infrastructure,

Economic, Community Dev, MIS, Urban Planner)

Tranport for Askot Kota Bau-Bau 3 8 Trip - 500.000 - Fixed Rate

For Training/Consolidation

Transport for Korkot/Askot Muna on OSP Consolidation 14 1 Trip - 500.000 - Fixed Rate

Transport for Korkot/Askot Kota Bau-Bau on OSP Consolidation 14 1 Trip - 500.000 - Fixed Rate

Transport for Korkot/Askot Buton on OSP Consolidation 14 1 Trip - 750.000 - Fixed Rate

Transport for Korkot/Askot Kolaka on OSP Consolidation 14 1 Trip - 150.000 - Fixed Rate

Transport for Korkot/Askot Konawe on OSP Consolidation 14 1 Trip - 100.000 - Fixed Rate

Transport for Korkot/Askot Kolaka Utara on OSP Consolidation 14 1 Trip - 300.000 - Fixed Rate

Transport for Korkot/Askot Bombana on OSP Consolidation 14 1 Trip - 300.000 - Fixed Rate

Special Training for Kelurahan Facilitators (Faskel):

Transport for SF, FT, FE, FS Muna 3 40 Trip - 500.000 - Fixed Rate

Transport for SF, FT, FE, FS Kota Bau-Bau 3 5 Trip - 500.000 - Fixed Rate

Transport for SF, FT, FE, FS Buton 3 21 Trip - 750.000 - Fixed Rate

Transport for SF, FT, FE, FS Kolaka 3 25 Trip - 150.000 - Fixed Rate

Transport for SF, FT, FE, FS Konawe 3 10 Trip - 100.000 - Fixed Rate

Transport for SF, FT, FE, FS Kolaka Utara 3 20 Trip - 300.000 - Fixed Rate

Transport for SF, FT, FE, FS Bombana 3 20 Trip - 300.000 - Fixed Rate

Special Event (by request)

From Muna

Local Transport 2 2 - Trip 18 100.000 1.800.000 Fixed Rate

Various Transport 2 2 - Trip 18 500.000 9.000.000 Fixed Rate

Hotel Acomodation 2 2 2 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixed Rate

From Bau-Bau

Local Transport 2 2 - Trip 13 100.000 1.300.000 Fixed Rate

Various Transport 2 2 - Trip 13 500.000 6.500.000 Fixed Rate

Hotel Acomodation 2 2 2 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixed Rate

From Buton

Local Transport 2 2 - Trip - 100.000 - Fixed Rate

Various Transport 2 2 - Trip - 750.000 - Fixed Rate

Hotel Acomodation 2 2 2 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixed Rate

From Kolaka

Local Transport 2 2 - Trip 31 150.000 4.650.000 Fixed Rate

Vol Rate Amount (IDR)

No Description time pers REMARKdays Unit

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Konawe

Local Transport 2 2 - Trip - 100.000 - Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Kolaka Utara

Local Transport 2 2 - Trip - 300.000 - Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

From Bombana

Local Transport 2 2 - Trip - 300.000 - Fixed Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixed Rate

2.3.2 TO JAKARTA 181.433.400

2.3.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 10.660.000

Air Transport 6 5 - Trip 3 2.800.000 6.408.100 Fixed Rate

In land Transport in Jakarta 6 5 - Trip 3 200.000 600.000 Ceiling Rate

OSA [ Fixed ] 6 5 4 Man/Days 11 100.000 1.100.000 Fixed Rate

TOT Pemandu Nasonal Korkot / Askot CD Mandiri

Air Transport 1 4 Trip 1 2.800.000 2.051.900 Ceiling Rate

In land Transport in Jakarta 1 4 Trip 1 200.000 200.000 Fixed Rate

OSA [ Fixed ] 1 4 8 Man/Days 3 100.000 300.000 Fixed Rate

TOT Pelatihan Program Lanjutan

Air Transport 1 2 Trip - 2.800.000 - Ceiling Rate

In land Transport in Jakarta 1 2 Trip - 200.000 - Fixed Rate

OSA [ Fixed ] 1 2 4 Man/Days - 100.000 - Fixed Rate

2.3.2.2 FOR EGM TO JAKARTA etc 159.900.400

Air Transport

Coordination Meeting for PD & TL 5 1 - Trip 6 2.800.000 12.927.200

EGM Spec [TA]/Sub Spec [Sub TA] Training 5 1 - Trip 5 2.800.000 13.315.300

EGM Socilization Specialist 5 1 - Trip 4 2.800.000 10.361.000

EGM Spec [TA]/Sub Spec MK/Sub Spec RLF 5 2 - Trip 8 2.800.000 20.941.200

EGM Spec [TA]/Sub Spec INFRA/Sub Spec Safeguard 5 1 - Trip 6 2.800.000 15.610.500

EGM Spec [TA]/Sub Spec Monev /Sub Spec Legal HCU 5 1 - Trip 5 2.800.000 13.278.700

EGM Spec [TA]/Sub Spec SIM 5 1 - Trip 6 2.800.000 15.195.600

EGM Spec [TA] Local Goverment 4 1 - Trip 3 2.800.000 7.170.900

EGM Spec [TA] Urban Planner 4 1 - Trip 3 2.800.000 8.400.000

In land Transport in Jakarta Trip 49 200.000 9.800.000 Fixed Rate

Hotel Accommodation 5 10 3 Man/Days 48 300.000 9.300.000 Ceiling Rate

OSA [ Fixed ] 5 10 4 Man/Days 236 100.000 23.600.000 Fixed Rate

2.3.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 10.873.000

Air Transport 14 3 - trip 3 2.800.000 8.373.000 Ceiling Rate

In land Transport in Jakarta 14 3 - Trip 3 200.000 500.000 Fixed Rate

Hotel Accommodation 14 3 4 Man/Days 3 300.000 900.000 Ceiling Rate

OSA [ Fixed ] 14 3 4 Man/Days 11 100.000 1.100.000 Fixed Rate

FOR COORDINATION MEETING CITY COORDINATOR TO JAKARTA (by request)

Air Transport 1 2 - trip - 2.800.000 - Ceiling Rate

In land Transport in Jakarta 1 2 - Trip - 200.000 - Fixed Rate

Hotel Accommodation 1 2 3 Man/Days - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 2 4 Man/Days - 100.000 - Fixed Rate

2.3.3 TO OTHER 17.547.500

FOR COORDINATION MEETING (by request) 17.547.500

Air Transport 4 2 1 trip 4 4.800.000 15.547.500 Ceiling Rate

In land Transport 4 2 1 Trip 4 200.000 800.000 Fixed Rate

Hotel Accommodation 4 2 2 Man/Days - 300.000 - Ceiling Rate

OSA [ Fixed ] 4 2 3 Man/Days 12 100.000 1.200.000 Fixed Rate

FOR LOKAKARYA NASIONAL

Air Transport - 2.800.000 - Ceiling Rate

In land Transport - 200.000 - Fixed Rate

Hotel Accommodation - 300.000 - Ceiling Rate

OSA [ Fixed ] - 100.000 - Fixed Rate

COODINATION FOR TIM PERCEPATAN KOTA

Local Transport - 300.000 - Fixed Rate

Local Transport Peserta Pelatihan perencanaan bagi TAPP - 100.000 -

2.3.4 ACTIVITIES TO JAKARTA 2017 73.907.600

1. RAKOR TEAM LEADER AND SPECIALIST OSP

Air Transport 1 7 1 7 2.800.000 19.600.000 Ceiling Rate

In land Transport 1 7 1 7 200.000 1.400.000 Fixed Rate

Ceiling Rate

Vol Rate Amount (IDR)

No Description time pers REMARKdays Unit

Hotel Accommodation 1 7 3 14 300.000 4.200.000 Ceiling Rate

OSA [ Fixed ] 1 7 4 21 100.000 2.100.000 Fixed Rate

2. ToT PEMANDU NASIONAL

Air Transport 1 7 1 13 2.800.000 34.807.600 Ceiling Rate

In land Transport 1 7 1 13 200.000 2.600.000 Fixed Rate

Hotel Accommodation 1 7 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 7 9 92 100.000 9.200.000 Fixed Rate

3. ToT PEMANDU SIM

Air Transport 1 2 1 - 2.800.000 - Ceiling Rate

In land Transport 1 2 1 - 200.000 - Fixed Rate

Hotel Accommodation 1 2 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 2 5 - 100.000 - Fixed Rate

4. KONSOLIDASI HASIL KEGIATAN LOKASI PRIORITAS

Air Transport 1 5 1 - 2.800.000 - Ceiling Rate

In land Transport 1 5 1 - 200.000 - Fixed Rate

Hotel Accommodation 1 5 3 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 5 4 - 100.000 - Fixed Rate

2.3.5 ACTIVITIES TO JAKARTA 2018 64.900.000

1. BY REQUEST

Air Transport 1 1 1 2.800.000 2.800.000 Ceiling Rate

In land Transport 1 1 1 200.000 200.000 Fixed Rate

Hotel Accommodation 1 1 3 3 300.000 900.000 Ceiling Rate

OSA [ Fixed ] 1 1 4 4 100.000 400.000 Fixed Rate

2. ToT and EGM

Air Transport 1 12 12 2.800.000 33.600.000 Ceiling Rate

In land Transport 1 12 12 200.000 2.400.000 Fixed Rate

Hotel Accommodation 1 12 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 12 7 84 100.000 8.400.000 Fixed Rate

3. TRAINING OF TRAINER KHUSUS SIM TO MAKASSAR

Air Transport 1 6 6 2.000.000 12.000.000 Ceiling Rate

In land Transport 1 6 6 200.000 1.200.000 Fixed Rate

Hotel Accommodation 1 6 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 6 5 30 100.000 3.000.000 Fixed Rate

442.094.900 TOTAL

Vol Rate Amount (IDR)

2.4.1 IN PROVINCE 83.704.400

2.4.1.1FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x Number of

Kelurahan)time pers days 19.350.000

From Kota Palu To Poso

Tranport 6 1 - Trip 4 300.000 1.200.000 Fixed Rate

Hotel Accpmodation 6 1 2 Man/Days 8 150.000 1.200.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 12 50.000 600.000 Fixed Rate

From Kota Palu To Toli-Toli

Various Tranport 6 1 - Trip 11 800.000 8.800.000 Fixed Rate

Hotel Accpmodation 6 1 2 Man/Days 21 150.000 3.150.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 32 50.000 1.600.000 Fixed Rate

From Kota Palu To PARIGI MOUTONG

Various Tranport - 800.000 - Fixed Rate

Hotel Accpmodation - 150.000 - Ceiling Rate

OSA [ Fixed ] - 50.000 - Fixed Rate

UJI PETIK OSP Sampai Dengan Juni 2018

From Kota Palu To Palu 1 2 3 Man/Days 6 50.000 300.000 Fixed Rate

From Kota Palu To Toli-Toli

Various Tranport 1 1 - Trip 1 800.000 800.000 Fixed Rate

Hotel Accpmodation 1 1 2 Man/Days 2 150.000 300.000 Ceiling Rate

OSA [ Fixed ] 1 1 3 Man/Days 3 50.000 150.000 Fixed Rate

Uji Petik Tematik

Various Tranport 1 1 - Trip 1 800.000 800.000 Fixed Rate

Hotel Accpmodation 1 1 2 Man/Days 2 150.000 300.000 Ceiling Rate

OSA [ Fixed ] 1 1 3 Man/Days 3 50.000 150.000 Fixed Rate

2.4.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 22.400.000

A. For City Coordinator and Assistance City Coordinator

Total 55 Kel x 50% x 6 6 14 day - 15.000 - Fixed Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel 3 50.000 150.000 Fixed Rate

B. For Ass. City Coordinator Infrastructure and FM in the city

(Total 55 Kel - 12 Kel luar kota) x 50% x 18 18 11 day - 15.000 - Fixed Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel 6 50.000 300.000 Fixed Rate

C. For City Coordinator Infrastructure and FM out of town

From Kota Palu To Poso

Local Tranport 24 3 - Trip 8 300.000 2.400.000 Fixed Rate

Hotel Acomodation 24 3 1 Man/Days 12 150.000 1.300.000 Ceiling Rate

OSA [ Fixed ] 24 3 2 Man/Days 24 50.000 1.200.000 Fixed Rate

From Kota Palu To Toli-Toli

Various Tranport 24 3 - Trip 14 800.000 11.200.000 Fixed Rate

Hotel Acomodation 24 3 1 Man/Days 18 150.000 2.700.000 Ceiling Rate

OSA [ Fixed ] 24 3 2 Man/Days 36 50.000 1.800.000 Fixed Rate

From Kota Palu To PARIGI MOUTONG

Various Tranport - 800.000 - Fixed Rate

Hotel Acomodation - 150.000 - Ceiling Rate

OSA [ Fixed ] - 50.000 - Fixed Rate

UJI PETIK KORKOT/ASKOT CM Mandiri Sampai Dengan Juni 2018

From Kota Palu To Palu 1 1 2 Man/Days 2 50.000 100.000 Fixed Rate

From Kota Palu To Toli-Toli

Various Tranport 1 1 - Trip 1 800.000 800.000 Fixed Rate

Hotel Accpmodation 1 1 2 Man/Days 2 150.000 300.000 Ceiling Rate

OSA [ Fixed ] 1 1 3 Man/Days 3 50.000 150.000 Fixed Rate

2.4.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL -

From Kota Palu To Poso

Local Tranport 12 3 - Trip - 300.000 - Fixed Rate

Hotel Acomodation 12 3 1 Man/Days - 150.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

From Kota Palu To Toli-Toli

Various Tranport 12 3 - Trip - 800.000 - Fixed Rate

Hotel Acomodation 12 3 1 Man/Days - 150.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

2.4.1.4FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION

MEETING7.950.000

From Kota Palu To Poso

REMARK

CONTRACT AMENDMENT NO. 24

daystime pers

2.4 DUTY TRAVEL EXPENSES PROVINCE CENTRAL SULAWESI

No Description Unit

Vol Rate Amount (IDR)

REMARKdaystime persNo Description Unit

Tranport 14 2 - Trip 4 300.000 1.200.000 Fixed Rate

Hotel Acomodation 14 2 1 Man/Days 3 150.000 450.000 Ceiling Rate

OSA [ Fixed ] 14 2 2 Man/Days 12 50.000 600.000 Fixed Rate

From Kota Palu To Toli-toli

Various Tranport 14 2 - Trip 5 800.000 4.000.000 Fixed Rate

Hotel Acomodation 14 2 1 Man/Days 6 150.000 900.000 Ceiling Rate

OSA [ Fixed ] 14 2 2 Man/Days 16 50.000 800.000 Fixed Rate

2.4.1.5FROM PROVINCE TO REGIONAL FOR WORKSHOP &

COORDINATION MEETING AT OC31.004.400

Workshop OC / Coordination Meeting at OC

From Kota Palu to Makasar

Air Tranport 5 9 - Trip 27 1.000.000 20.000.000 Ceiling Rate

OSA [ Fixed ] 5 9 2 Man/Days 67 100.000 4.600.000 Fixed Rate

Workshop OC / Coordination Meeting at OC

From Kota Palu to Manado (Sulawesi Utara)

Air Tranport 1 2.500.000 2.420.200 Ceiling Rate

OSA [ Fixed ] 3 100.000 300.000 Fixed Rate

Workshop OC / Coordination Meeting at OC

From Kota Palu to Kendari (Sulawesi Tenggara)

Air Tranport 2 2.000.000 3.084.200 Ceiling Rate

OSA [ Fixed ] 6 100.000 600.000 Fixed Rate

2.4.1.6FOR SEVERAL TRAINING & SPECIAL EVENT FROM KABUPATEN

TO KOTA PALU3.000.000

Training for City Coordinators Assistants (Infrastructure, Economic,

Community Dev, MIS, Urban Planner)

Transport for Askot Poso to Kota Palu 6 1 - Trip - 300.000 - Ceiling Rate

Various Transport for Askot Toli-Toli to Kota Palu 6 1 - Trip - 800.000 - Fixed Rate

Special Event (by request)

From Poso to Kota Palu

Tranport 2 2 - Trip 2 300.000 600.000 Fixed Rate

Hotel Acomodation 2 2 2 Man/Days - 150.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixed Rate

From Toli-Toli to Kota Palu

Various Tranport 2 2 - Trip 3 800.000 2.400.000 Fixed Rate

Hotel Acomodation 2 2 2 Man/Days - 150.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixed Rate

2.4.2 TO JAKARTA 159.464.000

2.4.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 24.313.200

Air Transport 6 3 - Trip 6 3.000.000 17.113.200 Ceiling Rate

In land Travel in Jakarta 6 3 - Trip 6 200.000 1.200.000 Fixed Rate

OSA [ Fixed ] 6 3 4 Man/Days 25 100.000 2.500.000 Fixed Rate

TOT Pemandu Nasonal Korkot / Askot CD Mandiri

Air Transport 1 3 Trip 1 3.000.000 3.000.000 Ceiling Rate

In land Transport in Jakarta 1 3 Trip 1 200.000 200.000 Fixed Rate

OSA [ Fixed ] 1 3 8 Man/Days 3 100.000 300.000 Fixed Rate

TOT Pelatihan Program Lanjutan

Air Transport 1 2 Trip - 3.000.000 - Ceiling Rate

In land Transport in Jakarta 1 2 Trip - 200.000 - Fixed Rate

OSA [ Fixed ] 1 2 4 Man/Days - 100.000 - Fixed Rate

2.4.2.2 FOR EGM TO JAKARTA 123.650.800

Air Transport

Coordination Meeting for PD & TL 5 1 - Trip 6 3.000.000 16.648.100

1 EGM Spec Training 5 1 - Trip 5 3.000.000 12.531.400

2 EGM Spec MK/ RLF 5 1 - Trip 6 3.000.000 14.880.000

3 EGM Spec INFRA 5 1 - Trip 6 3.000.000 13.751.800

4 EGM Spec SIM 5 1 - Trip 6 3.000.000 14.380.200

5 EGM Spec Local Goverment 5 1 - Trip 4 3.000.000 8.091.500

6 EGM Spec Urban Planner 5 1 - Trip 3 3.000.000 6.867.800

In land Transport in Jakarta Trip 41 200.000 8.200.000 Fixed Rate

Hotel Acomodation 5 7 3 Man/Days 49 300.000 8.400.000 Ceiling Rate

OSA [ Fixed ] 5 7 4 Man/Days 199 100.000 19.900.000 Fixed Rate

2.4.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 11.500.000

Air Transport 7 3 - Man/Days 3 3.000.000 9.000.000 Ceiling Rate

In land Transport in Jakarta 7 3 - Trip 3 200.000 500.000 Fixed Rate

Hotel Acomodation 7 3 3 Man/Days 3 300.000 900.000 Ceiling Rate

OSA [ Fixed ] 7 3 4 Man/Days 11 100.000 1.100.000 Fixed Rate

FOR COORDINATION MEETING CITY COORDINATOR TO JAKARTA (by request)

Air Transport 1 1 - - 3.000.000 - Ceiling Rate

In land Transport in Jakarta 1 1 - - 200.000 - Fixed Rate

Hotel Acomodation 1 1 3 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 1 4 - 100.000 - Fixed Rate

Ceiling Rate

Vol Rate Amount (IDR)

REMARKdaystime persNo Description Unit

2.4.3 TO OTHER 22.000.000

FOR COORDINATION MEETING (by request) 22.000.000

Air Transport 4 1 1 Man/Days 4 5.000.000 20.000.000 Ceiling Rate

In land Transport 4 1 1 Trip 4 200.000 800.000 Fixed Rate

Hotel Acomodation 4 1 2 Man/Days - 300.000 - Ceiling Rate

OSA [ Fixed ] 4 1 3 Man/Days 12 100.000 1.200.000 Fixed Rate

FOR LOKAKARYA NASIONAL

Air Transport - 3.000.000 - Ceiling Rate

In land Transport - 200.000 - Fixed Rate

Hotel Accommodation - 300.000 - Ceiling Rate

OSA [ Fixed ] - 100.000 - Fixed Rate

COODINATION FOR TIM PERCEPATAN KOTA

Local Transport - 300.000 - Fixed Rate

Local Transport Peserta Pelatihan perencanaan bagi TAPP - 100.000 -

2.4.4 ACTIVITIES TO JAKARTA 2017 63.701.000

1. RAKOR TEAM LEADER AND SPECIALIST OSP

Air Transport 1 6 1 6 3.000.000 18.000.000 Ceiling Rate

In land Transport 1 6 1 6 200.000 1.200.000 Fixed Rate

Hotel Accommodation 1 6 3 12 300.000 3.600.000 Ceiling Rate

OSA [ Fixed ] 1 6 4 18 100.000 1.800.000 Fixed Rate

2. ToT PEMANDU NASIONAL

Air Transport 1 5 1 11 3.000.000 29.301.000 Ceiling Rate

In land Transport 1 5 1 11 200.000 2.200.000 Fixed Rate

Hotel Accommodation 1 5 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 5 9 76 100.000 7.600.000 Fixed Rate

3. ToT PEMANDU SIM

Air Transport 1 2 1 - 3.000.000 - Ceiling Rate

In land Transport 1 2 1 - 200.000 - Fixed Rate

Hotel Accommodation 1 2 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 2 5 - 100.000 - Fixed Rate

4. KONSOLIDASI HASIL KEGIATAN LOKASI PRIORITAS

Air Transport 1 3 1 - 3.000.000 - Ceiling Rate

In land Transport 1 3 1 - 200.000 - Fixed Rate

Hotel Accommodation 1 3 3 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 3 4 - 100.000 - Fixed Rate

2.4.5 ACTIVITIES TO JAKARTA 2018 58.200.000

1. BY REQUEST

Air Transport 1 1 1 3.000.000 3.000.000 Ceiling Rate

In land Transport 1 1 1 200.000 200.000 Fixed Rate

Hotel Accommodation 1 1 3 3 300.000 900.000 Ceiling Rate

OSA [ Fixed ] 1 1 4 4 100.000 400.000 Fixed Rate

2. ToT and EGM

Air Transport 1 11 11 3.000.000 33.000.000 Ceiling Rate

In land Transport 1 11 11 200.000 2.200.000 Fixed Rate

Hotel Accommodation 1 11 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 11 7 77 100.000 7.700.000 Fixed Rate

3. TRAINING OF TRAINER KHUSUS SIM TO MAKASSAR

Air Transport 1 4 4 2.000.000 8.000.000 Ceiling Rate

In land Transport 1 4 4 200.000 800.000 Fixed Rate

Hotel Accommodation 1 4 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 4 5 20 100.000 2.000.000 Fixed Rate

387.069.400 TOTAL

Vol Rate Amount (IDR)

2.5.1 IN PROVINCE 55.557.600

2.5.1.1FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x Number of

Kelurahan)time pers days 6.100.000

From Kota Gorontalo To Gorontalo

Tranport 6 1 - Trip 14 100.000 1.400.000 Fixed Rate

Hotel Acomodation 6 1 2 Man/Days 14 150.000 2.100.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 39 50.000 1.950.000 Fixed Rate

From Kota Gorontalo To Pahuwato

Tranport - 100.000 - Fixed Rate

Hotel Acomodation - 150.000 - Ceiling Rate

OSA [ Fixed ] - 50.000 - Fixed Rate

UJI PETIK OSP Sampai Dengan Juni 2018

From Kota Gorontalo To Gorontalo 1 2 3 Man/Days 6 50.000 300.000 Fixed Rate

Uji Petik Tematik

Tranport 1 1 Trip 1 100.000 100.000 Fixed Rate

Hotel Acomodation 1 1 1 Man/Days 1 150.000 150.000 Ceiling Rate

OSA [ Fixed ] 1 1 2 Man/Days 2 50.000 100.000 Fixed Rate

2.5.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 9.100.000

A. For City Coordinator and Assistance City Coordinator

Total 70 Kel x 50% x 6 6 18 day - 15.000 - Fixed Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel 42 50.000 2.100.000

B. For Ass. City Coordinator Infrastructure and FM in the city

(Total 70 Kel - 21 Kel luar kota) x 50% x 18 18 12 day - 15.000 - Fixed Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel 25 50.000 1.250.000

C. For City Coordinator Infrastructure and FM out of town

From Kota Gorontalo To Gorontalo

Local Tranport 24 2 - Trip 31 100.000 3.100.000 Fixed Rate

Hotel Acomodation 24 2 1 Man/Days 2 150.000 300.000 Ceiling Rate

OSA [ Fixed ] 24 2 2 Man/Days 45 50.000 2.250.000 Fixed Rate

From Kota Gorontalo To Pahuwato

Tranport - 100.000 - Fixed Rate

Hotel Acomodation - 150.000 - Ceiling Rate

OSA [ Fixed ] - 50.000 - Fixed Rate

UJI PETIK KORKOT/ASKOT CD MANDIRI Sampai Dengan Juni 2018

From Kota Gorontalo To Gorontalo 1 1 2 Man/Days 2 50.000 100.000 Fixed Rate

2.5.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL -

From Kota Gorontalo To Gorontalo

Local Tranport 12 3 - Trip - 100.000 - Fixed Rate

Hotel Acomodation 12 3 1 Man/Days Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixed Rate

2.5.1.4FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION

MEETING1.850.000

From Kota Gorontalo To Gorontalo

Tranport 14 2 - Trip 4 100.000 400.000 Fixed Rate

Hotel Acomodation 14 2 1 Man/Days 5 150.000 750.000 Ceiling Rate

OSA [ Fixed ] 14 2 2 Man/Days 14 50.000 700.000 Fixed Rate

2.5.1.5FROM PROVINCE TO REGIONAL FOR WORKSHOP &

COORDINATION MEETING AT OC33.507.600

Workshop OC / Coordination Meeting at OC

From Kota Gorontalo to Makasar

Local Tranport 5 9 - Trip 18 100.000 1.800.000 Fixed Rate

Air Tranport 5 9 - Trip 17 1.500.000 20.602.600 Ceiling Rate

OSA [ Fixed ] 5 9 2 Man/Days 41 100.000 4.100.000 Fixed Rate

Workshop OC / Coordination Meeting at OC

From Kota Gorontalo to Manado (Sulawesi Utara)

Local Tranport 1 100.000 100.000 Fixed Rate

Air Tranport 1 1.500.000 805.000 Ceiling Rate

OSA [ Fixed ] 3 100.000 300.000 Fixed Rate

Workshop OC / Coordination Meeting at OC

From Kota Gorontalo to Kendari (Sulawesi Tenggara)

Local Tranport 2 100.000 200.000 Fixed Rate

Air Tranport 2 2.500.000 5.000.000 Ceiling Rate

OSA [ Fixed ] 6 100.000 600.000 Fixed Rate

REMARKCONTRACT AMENDMENT NO. 24

daystime pers

2.5 DUTY TRAVEL EXPENSES PROVINCE GORONTALO

No Description Unit

Vol Rate Amount (IDR)

REMARKdaystime persNo Description Unit

2.5.1.6FOR SEVERAL TRAINING & SPECIAL EVENT FROM KABUPATEN

TO KOTA GORONTALO5.000.000

Training for City Coordinators Assistants (Infrastructure, Economic,

Community Dev, MIS, Urban Planner)

Transport for Askot Gorontalo to Kota Gorontalo 6 1 - Trip - 100.000 - Fixed Rate

Special Event (by request)

From Gorontalo to Kota Gorontalo

Tranport 2 2 - Trip 50 100.000 5.000.000 Fixed Rate

Hotel Acomodation 2 2 2 Man/Days - 150.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixed Rate

2.5.2 TO JAKARTA 157.891.200

2.5.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 32.578.500

Air Transport 6 3 - Trip 9 3.000.000 23.578.500 Ceiling Rate

In land Travel in Jakarta 6 3 - Trip 9 200.000 1.800.000 Fixed Rate

OSA [ Fixed ] 6 3 4 Man/Days 37 100.000 3.700.000 Fixed Rate

TOT Pemandu Nasonal Korkot / Askot CD Mandiri

Air Transport 1 2 Trip 1 3.000.000 3.000.000 Ceiling Rate

In land Transport in Jakarta 1 2 Trip 1 200.000 200.000 Fixed Rate

OSA [ Fixed ] 1 2 8 Man/Days 3 100.000 300.000 Fixed Rate

TOT Pelatihan Program Lanjutan

Air Transport 1 2 Trip - 3.000.000 - Ceiling Rate

In land Transport in Jakarta 1 2 Trip - 200.000 - Fixed Rate

OSA [ Fixed ] 1 2 4 Man/Days - 100.000 - Fixed Rate

2.5.2.2 FOR EGM TO JAKARTA 109.212.700

Air Transport

Coordination Meeting for PD & TL 5 1 - Trip 5 3.000.000 12.466.000

1 EGM Spec Training 5 1 - Trip 5 3.000.000 13.082.200

2 EGM Spec MK/RLF 5 1 - Trip 6 3.000.000 16.062.400

3 EGM Spec INFRA 5 1 - Trip 6 3.000.000 16.162.500

4 EGM Spec SIM 5 1 - Trip 5 3.000.000 10.610.400

5 EGM Spec Local Goverment 5 1 - Trip 3 3.000.000 7.179.200

6 EGM Spec Urban Planner 5 1 - Trip 1 3.000.000 3.000.000

In land Transport in Jakarta Trip 31 200.000 6.200.000 Fixed Rate

Hotel Acomodation 5 7 3 Man/Days 39 300.000 7.650.000 Ceiling Rate

OSA [ Fixed ] 5 7 4 Man/Days 168 100.000 16.800.000 Fixed Rate

2.5.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 16.100.000

Air Transport 7 3 - Man/Days 4 3.000.000 12.000.000 Ceiling Rate

In land Transport in Jakarta 7 3 - Trip 4 200.000 800.000 Fixed Rate

Hotel Acomodation 7 3 3 Man/Days 6 300.000 1.800.000 Ceiling Rate

OSA [ Fixed ] 7 3 4 Man/Days 15 100.000 1.500.000 Fixed Rate

FOR COORDINATION MEETING CITY TO JAKARTA (by request)

Air Transport 1 1 - Man/Days - 3.000.000 - Ceiling Rate

In land Transport in Jakarta 1 1 - Trip - 200.000 - Fixed Rate

Hotel Acomodation 1 1 3 Man/Days - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 1 4 Man/Days - 100.000 - Fixed Rate

2.5.3 TO OTHER 18.848.200

FOR COORDINATION MEETING (by request) 18.848.200

Air Transport 4 1 1 Man/Days 4 5.000.000 16.848.200 Ceiling Rate

In land Transport 4 1 1 Trip 4 200.000 800.000 Fixed Rate

Hotel Acomodation 4 1 2 Man/Days - 300.000 - Ceiling Rate

OSA [ Fixed ] 4 1 3 Man/Days 12 100.000 1.200.000 Fixed Rate

FOR LOKAKARYA NASIONAL

Air Transport - 3.000.000 - Ceiling Rate

In land Transport - 200.000 - Fixed Rate

Hotel Accommodation - 300.000 - Ceiling Rate

OSA [ Fixed ] - 100.000 - Fixed Rate

COODINATION FOR TIM PERCEPATAN KOTA

Local Transport - 300.000 - Fixed Rate

Local Transport Peserta Pelatihan perencanaan bagi TAPP - 100.000 -

2.5.4 ACTIVITIES TO JAKARTA 2017 40.300.000

1. RAKOR TEAM LEADER AND SPECIALIST OSP

Air Transport 1 5 1 5 3.000.000 15.000.000 Ceiling Rate

In land Transport 1 5 1 5 200.000 1.000.000 Fixed Rate

Hotel Accommodation 1 5 3 10 300.000 3.000.000 Ceiling Rate

OSA [ Fixed ] 1 5 4 15 100.000 1.500.000 Fixed Rate

2. ToT PEMANDU NASIONAL

Air Transport 1 5 1 5 3.000.000 15.000.000 Ceiling Rate

In land Transport 1 5 1 5 200.000 1.000.000 Fixed Rate

Hotel Accommodation 1 5 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 5 9 38 100.000 3.800.000 Fixed Rate

Ceiling Rate

Vol Rate Amount (IDR)

REMARKdaystime persNo Description Unit

3. ToT PEMANDU SIM

Air Transport 1 2 1 - 3.000.000 - Ceiling Rate

In land Transport 1 2 1 - 200.000 - Fixed Rate

Hotel Accommodation 1 2 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 2 5 - 100.000 - Fixed Rate

4. KONSOLIDASI HASIL KEGIATAN LOKASI PRIORITAS

Air Transport 1 3 1 - 3.000.000 - Ceiling Rate

In land Transport 1 3 1 - 200.000 - Fixed Rate

Hotel Accommodation 1 3 3 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 3 4 - 100.000 - Fixed Rate

2.5.5 ACTIVITIES TO JAKARTA 2018 62.200.000

1. BY REQUEST

Air Transport 1 1 1 3.000.000 3.000.000 Ceiling Rate

In land Transport 1 1 1 200.000 200.000 Fixed Rate

Hotel Accommodation 1 1 3 3 300.000 900.000 Ceiling Rate

OSA [ Fixed ] 1 1 4 4 100.000 400.000 Fixed Rate

2. ToT and EGM

Air Transport 1 11 11 3.000.000 33.000.000 Ceiling Rate

In land Transport 1 11 11 200.000 2.200.000 Fixed Rate

Hotel Accommodation 1 11 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 11 7 77 100.000 7.700.000 Fixed Rate

3. TRAINING OF TRAINER KHUSUS SIM TO MAKASSAR

Air Transport 1 4 4 3.000.000 12.000.000 Ceiling Rate

In land Transport 1 4 4 200.000 800.000 Fixed Rate

Hotel Accommodation 1 4 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 4 5 20 100.000 2.000.000 Fixed Rate

334.797.000 TOTAL

Vol Rate Amount (IDR)

2.6.1 IN PROVINCE 138.929.750

2.6.1.1FOR SPOTCHECK PROVINCE TO KELURAHAN (5 % x Number of

Kelurahan)time pers days 20.625.000

From Manado to Bitung, Minahasa Utara

Local Transport 6 1 - Trip 7 150.000 1.050.000 Fixe Rate

Hotel Acomodation 6 1 2 Man/Days 14 175.000 2.450.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 21 50.000 1.050.000 Fixe Rate

From Manado to Tomohon, Minahasa

Local Transport 6 1 - Trip 7 100.000 700.000 Fixe Rate

Hotel Acomodation 6 1 2 Man/Days 14 175.000 2.450.000 Ceiling Rate

OSA [ Fixed ] 6 1 3 Man/Days 21 50.000 1.050.000 Fixe Rate

From Manado to Kepulauan Sangihe

Local Transport 6 1 - Trip 3 100.000 300.000 Fixe Rate

Various Transport 6 1 - Trip 3 800.000 2.400.000 Fixe Rate

Hotel Acomodation 6 1 1 Man/Days 3 175.000 525.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 6 50.000 300.000 Fixe Rate

From Manado to Kota Mobagu

Local Transport 6 1 - Trip 8 200.000 1.600.000 Fixe Rate

Hotel Acomodation 6 1 1 Man/Days 12 175.000 2.100.000 Ceiling Rate

OSA [ Fixed ] 6 1 2 Man/Days 20 50.000 1.000.000 Fixe Rate

UJI PETIK OSP Sampai Dengan Juni 2018

From Kota Manado To Manado 1 2 3 Man/Days 6 50.000 300.000 Fixe Rate

From Manado to Bitung

Local Transport 1 2 Trip 2 150.000 300.000 Fixe Rate

Hotel Acomodation 1 2 2 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 1 2 3 Man/Days 6 50.000 300.000 Fixe Rate

From Manado to Tomohon

Local Transport 1 2 Trip 2 100.000 200.000 Fixe Rate

Hotel Acomodation 1 2 2 Man/Days 4 175.000 700.000 Ceiling Rate

OSA [ Fixed ] 1 2 3 Man/Days 6 50.000 300.000 Fixe Rate

Uji Petik Tematik

Local Transport 2 1 Trip 2 150.000 300.000 Fixe Rate

Hotel Acomodation 2 1 1 Man/Days 2 175.000 350.000 Ceiling Rate

OSA [ Fixed ] 2 1 2 Man/Days 4 50.000 200.000 Fixe Rate

2.6.1.2 6.250.000

A. For City Coordinator and Assistance City Coordinator

Total 297 Kel x 50% x 6 6 74 day - 15.000 - Fixe Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel - 50.000 - Fixe Rate

B. For Ass. City Coordinator Infrastructure and FM in the city

(Total 297 Kel - 31 Kel luar kota) x 50% x 18 18 67 day - 15.000 - Fixe Rate

Cost / Day Rp. 50.000.- 1 Day cover 2 kel - 50.000 - Fixe Rate

C. For City Coordinator Infrastructure and FM out of town

From Bitung to Minahasa Utara

Local Transport 24 3 - Trip 2 100.000 200.000 Fixe Rate

Acomodation 24 3 1 Man/Days 6 175.000 1.050.000 Ceiling Rate

OSA [ Fixed ] 24 3 2 Man/Days 12 50.000 600.000 Fixe Rate

Transport by Sea to Lembe - 1.000.000 - Fixe Rate

From Manado to Kepulauan Sangihe

Local Transport 24 3 - Trip 2 100.000 200.000 Fixe Rate

Various Transport 24 3 - Trip 2 800.000 1.600.000 Fixe Rate

Acomodation 24 3 1 Man/Days 6 175.000 1.050.000 Ceiling Rate

OSA [ Fixed ] 24 3 2 Man/Days 12 50.000 600.000 Fixe Rate

UJI PETIK KORKOT/ASKOT CD MANDIRI Sampai Dengan Juni 2018

From Kota Manado To Manado 1 1 3 Man/Days 3 50.000 150.000 Fixe Rate

From Manado to Bitung

Local Transport 1 1 Trip 1 150.000 150.000 Fixe Rate

Hotel Acomodation 1 1 1 Man/Days 1 175.000 175.000 Ceiling Rate

OSA [ Fixed ] 1 1 2 Man/Days 2 50.000 100.000 Fixe Rate

From Manado to Tomohon

Local Transport 1 1 Trip 1 100.000 100.000 Fixe Rate

Hotel Acomodation 1 1 1 Man/Days 1 175.000 175.000 Ceiling Rate

OSA [ Fixed ] 1 1 2 Man/Days 2 50.000 100.000 Fixe Rate

2.6.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL -

From Bitung to Minahasa Utara

Local Transport 12 3 - Trip - 100.000 - Fixe Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixe Rate

From Manado to Kepulauan Sangihe

Local Transport 12 3 - Trip - 100.000 - Fixe Rate

Various Transport 12 3 - Trip - 800.000 - Fixe Rate

Acomodation 12 3 1 Man/Days - 175.000 - Ceiling Rate

OSA [ Fixed ] 12 3 2 Man/Days - 50.000 - Fixe Rate

2.6.1.4 17.650.000

2.6 DUTY TRAVEL EXPENSES PROVINCE NORTH SULAWESI

days UnitDescription time persNo

SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM

FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING

REMARKCONTRACT AMENDMENT NO. 24

Vol Rate Amount (IDR)

days UnitDescription time persNo REMARK

No of

City/RegTime Person Days

From Bitung

Local Transport 14 1 - Trip 10 150.000 1.500.000 Fixe Rate

Hotel Acomodation 14 1 2 Man/Days 12 250.000 3.000.000 Ceiling Rate

OSA [ Fixed ] 14 1 3 Man/Days 52 50.000 1.400.000 Fixe Rate

From Minahasa Utara

Local Transport 14 1 - Trip 1 150.000 150.000 Fixe Rate

Hotel Acomodation 14 1 2 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 14 1 3 Man/Days 6 50.000 300.000 Fixe Rate

From Tomohon

Local Transport 14 1 - Trip 5 100.000 500.000 Fixe Rate

Hotel Acomodation 14 1 2 Man/Days 12 250.000 3.000.000 Ceiling Rate

OSA [ Fixed ] 14 1 3 Man/Days 22 50.000 1.100.000 Fixe Rate

From Minahasa

Local Transport 14 1 - Trip 1 100.000 100.000 Fixe Rate

Hotel Acomodation 14 1 2 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 14 1 3 Man/Days 6 50.000 300.000 Fixe Rate

From Kepulauan Sangihe

Local Transport 14 1 - Trip 1 100.000 100.000 Fixe Rate

Various Transport 14 1 - Trip 1 800.000 800.000 Fixe Rate

Hotel Acomodation 14 1 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 14 1 2 Man/Days 6 50.000 300.000 Fixe Rate

From Kota Mobagu

Local Transport 14 1 - Trip 5 200.000 1.000.000 Fixe Rate

Hotel Acomodation 14 1 1 Man/Days 12 250.000 3.000.000 Ceiling Rate

OSA [ Fixed ] 14 1 2 Man/Days 22 50.000 1.100.000 Fixe Rate

2.6.1.5FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION

MEETING AT OC56.554.750

time pers days

From Kota Manado To Makassar

Local Tranport 5 11 - Trip 28 100.000 2.800.000 Fixe Rate

Air Transport 5 11 1 Man/Days 29 1.800.000 44.230.750 Ceiling Rate

OSA [ Fixed ] 5 11 2 Man/Days 66 100.000 6.600.000 Fixe Rate

From Kota Manado To Kendari (Sulawesi Tenggara)

Local Tranport 2 100.000 200.000 Fixe Rate

Air Transport 2 2.500.000 2.124.000 Ceiling Rate

OSA [ Fixed ] 6 100.000 600.000 Fixe Rate

2.6.1.6FOR SEVERAL TRAINING & SPECIAL EVENT FROM KABUPATEN TO

MANADO37.850.000

time pers days

Training for City Coordinators Assistants (Infrastructure, Economic,

Community Dev, MIS, Urban Planner)

Tranport for Askot Bitung 3 8 Trip - 150.000 - Fixe Rate

Tranport for Askot Tomohon 3 5 Trip - 100.000 - Fixe Rate

Tranport for Askot Minahasa 3 4 Trip - 100.000 - Fixe Rate

Tranport for Askot Kota Mobagu 3 4 Trip - 200.000 - Fixe Rate

For Training/Consolidation

Transport for Korkot/Askot Bitung on OSP Consolidation 14 1 Trip - 150.000 - Fixe Rate

Transport for Korkot/Askot Minahasa Utara on OSP Consolidation 14 1 Trip - 150.000 - Fixe Rate

Transport for Korkot/Askot Tomohon on OSP Consolidation 14 1 Trip - 100.000 - Fixe Rate

Transport for Korkot/Askot Minahasa on OSP Consolidation 14 1 Trip - 100.000 - Fixe Rate

Transport for Korkot/Askot Kep. Sangihe on OSP Consolidation 14 1 Trip - 800.000 - Fixe Rate

Transport for Korkot/Askot Kota Mobagu on OSP Consolidation 14 1 Trip - 200.000 - Fixe Rate

Advance Training/Couching PLPBK for City Coordinator Assistant UP 3 1 Trip - 100.000 - Fixe Rate

Special Training for Kelurahan Facilitators (Faskel):

Transport for SF, FT, FE, FS Bitung 3 40 Trip - 150.000 - Fixe Rate

Transport for SF, FT, FE, FS Minahasa Utara 3 5 Trip - 150.000 - Fixe Rate

Transport for SF, FT, FE, FS Tomohon 3 21 Trip - 100.000 - Fixe Rate

Transport for SF, FT, FE, FS Minahasa 3 25 Trip - 100.000 - Fixe Rate

Transport for SF, FT, FE, FS Kep. Sangihe 3 10 Trip - 800.000 - Fixe Rate

Transport for SF, FT, FE, FS Kota Mobagu 3 20 Trip - 200.000 - Fixe Rate

Special Event (by request)

From Bitung

Local Transport 2 2 - Trip 52 150.000 7.800.000 Fixe Rate

Hotel Acomodation 2 2 2 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixe Rate

From Minahasa Utara

Local Transport 2 2 - Trip 9 150.000 1.350.000 Fixe Rate

Hotel Acomodation 2 2 2 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixe Rate

From Tomohon

Local Transport 2 2 - Trip 28 100.000 2.800.000 Fixe Rate

Hotel Acomodation 2 2 2 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixe Rate

From Minahasa

Local Transport 2 2 - Trip 28 100.000 2.800.000 Fixe Rate

Hotel Acomodation 2 2 2 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 3 Man/Days - 50.000 - Fixe Rate

From Kepulauan Sangihe

Local Transport 2 2 - Trip 9 100.000 900.000 Fixe Rate

Various Transport 2 2 - Trip 25 800.000 20.000.000 Fixe Rate

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixe Rate

From Kota Mobagu

Local Transport 2 2 - Trip 11 200.000 2.200.000 Fixe Rate

Vol Rate Amount (IDR)

days UnitDescription time persNo REMARK

Hotel Acomodation 2 2 1 Man/Days - 250.000 - Ceiling Rate

OSA [ Fixed ] 2 2 2 Man/Days - 50.000 - Fixe Rate

2.6.2 TO JAKARTA 209.274.400

2.6.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 51.683.300

Air Transport 6 5 - Trip 13 3.200.000 40.183.300 Ceiling Rate

In land Transport in Jakarta 6 5 - Trip 13 200.000 2.600.000 Fixe Rate

OSA [ Fixed ] 6 5 4 Man/Days 52 100.000 5.200.000 Fixe Rate

TOT Pemandu Nasonal Korkot / Askot CD Mandiri

Air Transport 1 7 Trip 1 3.200.000 3.200.000 Ceiling Rate

In land Transport in Jakarta 1 7 Trip 1 200.000 200.000 Fixe Rate

OSA [ Fixed ] 1 7 8 Man/Days 3 100.000 300.000 Fixe Rate

TOT Pelatihan Program Lanjutan

Air Transport 1 2 Trip - 3.200.000 - Ceiling Rate

In land Transport in Jakarta 1 2 Trip - 200.000 - Fixe Rate

OSA [ Fixed ] 1 2 4 Man/Days - 100.000 - Fixe Rate

2.6.2.2 FOR EGM TO JAKARTA etc 141.560.800

Air Transport

Coordination Meeting for PD & TL 5 1 - Trip 5 3.200.000 14.785.000

EGM Spec [TA]/Sub Spec [Sub TA] Training 5 1 - Trip 3 3.200.000 9.154.500

EGM Socilization Specialist 5 1 - Trip 3 3.200.000 9.151.600

EGM Spec [TA]/Sub Spec MK/Sub Spec RLF 5 2 - Trip 5 3.200.000 14.849.900

EGM Spec [TA]/Sub Spec INFRA/Sub Spec Safeguard 5 1 - Trip 5 3.200.000 15.399.800

EGM Spec [TA]/Sub Spec Monev /Sub Spec Legal HCU 5 1 - Trip 5 3.200.000 15.080.000

EGM Spec [TA]/Sub Spec SIM 5 1 - Trip 5 3.200.000 15.327.200

EGM Spec [TA] Local Goverment 4 1 - Trip 3 3.200.000 9.326.800

EGM Spec [TA] Urban Planner 4 1 - Trip 2 3.200.000 5.636.000

In land Transport in Jakarta Trip 36 200.000 7.200.000 Fixe Rate

Hotel Accommodation 5 10 3 Man/Days 21 300.000 5.250.000 Ceiling Rate

OSA [ Fixed ] 5 10 4 Man/Days 204 100.000 20.400.000 Fixe Rate

2.6.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 16.030.300

Air Transport 14 3 - trip 4 3.200.000 12.530.300 Ceiling Rate

In land Transport in Jakarta 14 3 - Trip 4 200.000 700.000 Fixe Rate

Hotel Accommodation 14 3 4 Man/Days 3 300.000 900.000 Ceiling Rate

OSA [ Fixed ] 14 3 4 Man/Days 19 100.000 1.900.000 Fixe Rate

FOR COORDINATION MEETING CITY TO JAKARTA (by request)

Air Transport 1 5 - - 3.200.000 - Ceiling Rate

In land Transport in Jakarta 1 5 - - 200.000 - Fixe Rate

Hotel Accommodation 1 5 3 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 5 4 - 100.000 - Fixe Rate

2.6.3 TO OTHER 17.628.100

FOR COORDINATION MEETING (by request) 17.628.100

Air Transport 4 2 1 trip 4 5.200.000 15.628.100 Ceiling Rate

In land Transport 4 2 1 Trip 4 200.000 800.000 Fixe Rate

Hotel Accommodation 4 2 2 Man/Days - 300.000 - Ceiling Rate

OSA [ Fixed ] 4 2 3 Man/Days 12 100.000 1.200.000 Fixe Rate

COODINATION FOR TIM PERCEPATAN KOTA

Local Transport - 300.000 - Fixed Rate

Local Transport Peserta Pelatihan perencanaan bagi TAPP - 100.000 -

2.6.4 ACTIVITIES TO JAKARTA 2017 105.656.500

1. RAKOR TEAM LEADER AND SPECIALIST OSP

Air Transport 1 7 1 7 5.200.000 36.400.000 Ceiling Rate

In land Transport 1 7 1 7 200.000 1.400.000 Fixe Rate

Hotel Accommodation 1 7 3 14 300.000 4.200.000 Ceiling Rate

OSA [ Fixed ] 1 7 4 21 100.000 2.100.000 Fixe Rate

2. ToT PEMANDU NASIONAL

Air Transport 1 5 1 11 5.200.000 51.756.500 Ceiling Rate

In land Transport 1 5 1 11 200.000 2.200.000 Fixe Rate

Hotel Accommodation 1 5 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 5 9 76 100.000 7.600.000 Fixe Rate

3. ToT PEMANDU SIM

Air Transport 1 2 1 - 5.200.000 - Ceiling Rate

In land Transport 1 2 1 - 200.000 - Fixe Rate

Hotel Accommodation 1 2 - - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 2 5 - 100.000 - Fixe Rate

4. KONSOLIDASI HASIL KEGIATAN LOKASI PRIORITAS

Air Transport 1 3 1 - 5.200.000 - Ceiling Rate

In land Transport 1 3 1 - 200.000 - Fixe Rate

Hotel Accommodation 1 3 3 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 3 4 - 100.000 - Fixe Rate

2.6.5 ACTIVITIES TO JAKARTA 2017 127.500.000

2. BY REQUEST

Air Transport 1 1 1 5.200.000 5.200.000 Ceiling Rate

In land Transport 1 1 1 200.000 200.000 Fixe Rate

Hotel Accommodation 1 1 3 3 300.000 900.000 Ceiling Rate

OSA [ Fixed ] 1 1 4 4 100.000 400.000 Fixe Rate

3. ToT and EGM

Air Transport 1 14 14 5.200.000 72.800.000 Ceiling Rate

In land Transport 1 14 14 200.000 2.800.000 Fixe Rate

Hotel Accommodation 1 14 - 300.000 - Ceiling Rate

Ceiling Rate

Vol Rate Amount (IDR)

days UnitDescription time persNo REMARK

OSA [ Fixed ] 1 14 7 98 100.000 9.800.000 Fixe Rate

5. TRAINING OF TRAINER KHUSUS SIM TO MAKASSAR

Air Transport 1 6 6 5.200.000 31.200.000 Ceiling Rate

In land Transport 1 6 6 200.000 1.200.000 Fixe Rate

Hotel Accommodation 1 6 - 300.000 - Ceiling Rate

OSA [ Fixed ] 1 6 5 30 100.000 3.000.000 Fixe Rate

598.988.750 TOTAL

Vol Rate Amount (IDR)

2.7.1 OFFICE RUNNING COST 1.594.244.492

2.7.1.1 OSP Office 480.660.130

Province South Sulawesi (Makassar) Month 24,0 2.000.000 42.173.338

50,0 2.264.000 112.328.593

Province South East Sulawesi (Kendari) Month 24,0 1.000.000 16.886.030

50,0 1.132.000 52.439.644

Province North Sulawesi (Manado) Month 24,0 1.000.000 23.193.163

50,0 1.132.000 56.538.992

Province West Sulawesi (Mamuju) Month 24,0 750.000 16.804.906

50,0 849.000 42.409.132

Province Central Sulawesi (Palu) Month 24,0 750.000 17.693.939

50,0 849.000 42.396.035

Province Gorontalo (Gorontalo) Month 24,0 750.000 15.353.407

50,0 849.000 42.442.951

2.7.1.2 City Coordinator Office 869.364.362

Province South Sulawesi ( 6 City Coordinators ) Month 114,0 500.000 51.384.560

1. Kota Makassar (143 Kelurahan) 50,0 1.250.000 62.500.000

2. Kabupaten Gowa (14 Kelurahan) 46,5 950.000 44.175.000

3. Kabupaten Wajo (16 Kelurahan) 35,0 950.000 33.250.000

4. Kota Pare-pare (22 Kelurahan) 50,0 950.000 47.500.000

5. Kota Palopo (48 Kelurahan) 50,0 950.000 47.500.000

6. Kabupaten Bulukumba (9 Kelurahan) 35,0 950.000 33.250.000

Province South East Sulawesi (2 City Coordinators ) Month 42,0 500.000 20.028.000

1. Kota Kendari (64 Kelurahan) 50,0 1.100.000 55.000.000

2. Kota Bau Bau (43 Kelurahan) 34,0 950.000 32.300.000

Kota Kolaka 15,0 950.000 14.250.000

3. Kota Muna - 950.000 -

Province North Sulawesi (5 City Coordinators ) Month 96,0 500.000 44.781.245

1. Kota Manado (87 Kelurahan) 50,0 1.100.000 55.000.000

2. Kota Bitung (69 Kelurahan) 50,0 1.100.000 55.000.000

3. Kota Tomohon (44 Kelurahan) 35,0 950.000 33.250.000

4. Kota Kotamubagu (33 Kelurahan) 35,0 950.000 33.250.000

5. Kabupaten Minahasa (43 Kelurahan) 35,0 950.000 33.250.000

6. Kota Sangihe - 950.000 -

Province West Sulawesi (1 City Coordinators ) Month 24,0 500.000 10.908.125

1. Kabupaten Polewali Mandar (9 Kelurahan) 35,0 950.000 33.250.000

2. Kota Majene 14,5 950.000 13.775.000

Province Central Sulawesi (1 City Coordinators ) Month 24,0 500.000 10.372.251

1. Kota Palu (45 Kelurahan) 50,0 950.000 47.500.000

Province Gorontalo (1 City Coordinators ) Month 24,0 500.000 10.390.181

1. Kota Gorontalo (50 Kelurahan) 50,0 950.000 47.500.000

2.7.1.3 Assitant CD City Coordinator Office 244.220.000

Province South Sulawesi ( 12 Assistant City Coordinators ) Month 598,2 200.000 119.640.000

Province South East Sulawesi (6 Assistant City Coordinators ) Month 145,6 200.000 29.120.000

Province North Sulawesi (2 Assistant City Coordinators ) Month 186,5 200.000 37.300.000

Province West Sulawesi (2 Assisrtant City Coordinators ) Month 72,5 200.000 14.500.000

Province Central Sulawesi (2 Assisrtant City Coordinators ) Month 145,5 200.000 29.100.000

Province Gorontalo (1 Assisrtant City Coordinators ) Month 72,8 200.000 14.560.000

2.7.2 OFFICE SUPPLY & CONSUMABLE 647.522.717

2.7.2.1 OSP Office 247.271.817

Province South Sulawesi (Makassar) Month 24,0 750.000 15.124.150

50,0 849.000 42.040.475

Province South East Sulawesi (Kendari) Month 24,0 500.000 12.000.000

50,0 566.000 27.934.300

Province North Sulawesi (Manado) Month 24,0 500.000 8.441.415

50,0 566.000 27.167.950

Province West Sulawesi (Mamuju) Month 24,0 500.000 10.802.300

50,0 566.000 28.192.550

Province Central Sulawesi (Palu) Month 24,0 500.000 9.893.525

50,0 566.000 27.991.475

Province Gorontalo (Gorontalo) Month 24,0 500.000 9.562.400

50,0 566.000 28.121.277

2.7.2.2 City Coordinator Office 275.990.900

Province South Sulawesi ( 6 City Coordinators ) Month 114,0 250.000 24.783.800

REMARK

Fixed Rate

Ceiling Rate

Fixed Rate

Fixed Rate

Ceiling Rate

CONTRACT AMENDMENT NO. 24

2.7 OFFICE OPERATIONAL EXPENSES

No UnitDescription

Vol Rate Amount (IDR)

REMARKNo UnitDescription

1. Kota Makassar (143 Kelurahan) 50,0 500.000 25.000.000

2. Kabupaten Gowa (14 Kelurahan) 47,0 250.000 11.750.000

3. Kabupaten Wajo (16 Kelurahan) 35,0 250.000 8.750.000

4. Kota Pare-pare (22 Kelurahan) 50,0 250.000 12.500.000

5. Kota Palopo (48 Kelurahan) 50,0 250.000 12.500.000

6. Kabupaten Bulukumba (9 Kelurahan) 35,0 250.000 8.750.000

Province South East Sulawesi (2 City Coordinators ) Month 46,0 250.000 11.500.000

1. Kota Kendari (64 Kelurahan) 50,0 300.000 15.000.000

2. Kota Bau Bau (43 Kelurahan) 35,0 250.000 8.750.000

Kota Kolaka 15,0 250.000 3.750.000

3. Kota Muna - 250.000 -

Province North Sulawesi (5 City Coordinators ) Month 96,0 250.000 22.532.600

1. Kota Manado (87 Kelurahan) 50,0 300.000 15.000.000

2. Kota Bitung (69 Kelurahan) 50,0 300.000 15.000.000

3. Kota Tomohon (44 Kelurahan) 35,0 250.000 8.750.000

4. Kota Kotamubagu (33 Kelurahan) 35,0 250.000 8.750.000

5. Kabupaten Minahasa (43 Kelurahan) 35,0 250.000 8.750.000

6. Kota Sangihe - 250.000 -

Province West Sulawesi (1 City Coordinators ) Month 24,0 250.000 5.250.000

1. Kabupaten Polewali Mandar (9 Kelurahan) 36,0 250.000 9.000.000

2. Kota Majene 14,0 250.000 3.500.000

Province Central Sulawesi (1 City Coordinators ) Month 24,0 250.000 5.424.500

1. Kota Palu (45 Kelurahan) 50,0 250.000 12.500.000

Province Gorontalo (1 City Coordinators ) Month 24,0 250.000 6.000.000

1. Kota Gorontalo (50 Kelurahan) 50,0 250.000 12.500.000

2.7.2.3 Assitant CD City Coordinator Office 124.260.000

Province South Sulawesi ( 12 Assistant City Coordinators ) Month 598,2 100.000 59.820.000

Province South East Sulawesi (6 Assistant City Coordinators ) Month 145,6 100.000 14.960.000

Province North Sulawesi (2 Assistant City Coordinators ) Month 178,5 100.000 18.100.000

Province West Sulawesi (2 Assisrtant City Coordinators ) Month 77,5 100.000 8.200.000

Province Central Sulawesi (2 Assisrtant City Coordinators ) Month 145,5 100.000 14.950.000

Province Gorontalo (1 Assisrtant City Coordinators ) Month 77,8 100.000 8.230.000

2.7.3 COMMUNICATION COST 798.109.102

2.7.3.1 OSP Office 487.114.102

Province South Sulawesi (Makassar) Month 37,0 1.500.000 50.094.933

37,0 1.698.000 59.658.000

Province South East Sulawesi (Kendari) Month 37,0 1.000.000 36.013.153

37,0 1.132.000 39.772.000

Province North Sulawesi (Manado) Month 37,0 1.000.000 35.244.768

37,0 1.132.000 39.772.000

Province West Sulawesi (Mamuju) Month 37,0 1.000.000 35.754.141

37,0 1.132.000 39.772.000

Province Central Sulawesi (Palu) Month 37,0 1.000.000 35.651.986

37,0 1.132.000 39.772.000

Province Gorontalo (Gorontalo) Month 37,0 1.000.000 35.837.121

37,0 1.132.000 39.772.000

2.7.3.2 City Coordinator Office 217.200.000

Province South Sulawesi ( 6 City Coordinators ) Month 409,0 200.000 81.800.000

1. Kota Makassar (143 Kelurahan) - 750.000 -

2. Kabupaten Gowa (14 Kelurahan) - 500.000 -

3. Kabupaten Wajo (16 Kelurahan) - 500.000 -

4. Kota Pare-pare (22 Kelurahan) - 500.000 -

5. Kota Palopo (48 Kelurahan) - 500.000 -

6. Kabupaten Bulukumba (9 Kelurahan) - 500.000 -

Province South East Sulawesi (2 City Coordinators ) Month 142,0 200.000 28.400.000

1. Kota Kendari (64 Kelurahan) - 600.000 -

2. Kota Bau Bau (43 Kelurahan) - 500.000 -

3. Kota Muna - 500.000 -

Province North Sulawesi (5 City Coordinators ) Month 313,0 200.000 62.600.000

1. Kota Manado (87 Kelurahan) - 600.000 -

2. Kota Bitung (69 Kelurahan) - 600.000 -

3. Kota Tomohon (44 Kelurahan) - 500.000 -

4. Kota Kotamubagu (33 Kelurahan) - 500.000 -

5. Kabupaten Minahasa (43 Kelurahan) - 500.000 -

6. Kota Sangihe - 500.000 -

Province West Sulawesi (1 City Coordinators ) Month 74,0 200.000 14.800.000

1. Kabupaten Polewali Mandar (9 Kelurahan) - 500.000 -

2. Kota Majene - 500.000 -

Province Central Sulawesi (1 City Coordinators ) Month 74,0 200.000 14.800.000

1. Kota Palu (45 Kelurahan) - 500.000 -

Province Gorontalo (1 City Coordinators ) Month 74,0 200.000 14.800.000

1. Kota Gorontalo (50 Kelurahan) - 500.000 -

2.7.3.3 Assitant CD City Coordinator Office 93.795.000

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Vol Rate Amount (IDR)

REMARKNo UnitDescription

Province South Sulawesi ( 12 Assistant City Coordinators ) Month 598,2 75.000 44.865.000

Province South East Sulawesi (6 Assistant City Coordinators ) Month 145,6 75.000 11.220.000

Province North Sulawesi (2 Assistant City Coordinators ) Month 186,5 75.000 14.175.000

Province West Sulawesi (2 Assisrtant City Coordinators ) Month 77,5 75.000 6.150.000

Province Central Sulawesi (2 Assisrtant City Coordinators ) Month 145,5 75.000 11.212.500

Province Gorontalo (1 Assisrtant City Coordinators ) Month 77,8 75.000 6.172.500

2.7.4. SUPPORT TIM PERCEPATAN KOTA 45.000.000

OFFICE OPERATIONAL

1 BOP Tim Percepatan Kota Month 15,0 3.000.000 45.000.000 Fixed Rate

3.084.876.311

Fixed Rate

TOTAL

2.8 OFFICE EQUIPMENT EXPENSES [ PURCHASES ]

Vol Rate Amount (IDR)

2.8.1 OSP OFFICE 396.200.000

2.8.1.1 Province South Sulawesi (Makassar) 81.450.000

Desktop Computer Piece 5,0 4.500.000 22.500.000

Laptop/Notebook Piece 7,0 5.750.000 40.250.000

Printer Laser Jet Piece 3,0 2.000.000 6.000.000

Printer Color A3 Piece 1,0 3.000.000 3.000.000

Digital Camera Piece - 1.000.000 0

GPS tools Piece 1,0 3.500.000 3.500.000

LCD Projector Piece 1,0 5.000.000 5.000.000

Scanner Piece 2,0 600.000 1.200.000

Equipment Maintenance (Include existing equipment) Atcost - 15.000.000 0

2.8.1.2 Province South East Sulawesi (Kendari) 69.850.000

Desktop Computer Piece 3,0 4.500.000 13.500.000

Laptop/Notebook Piece 7,0 5.750.000 40.250.000

Printer Laser Jet Piece 2,0 2.000.000 4.000.000

Printer Color A3 Piece 1,0 3.000.000 3.000.000

Digital Camera Piece - 1.000.000 0

GPS tools Piece 1,0 3.500.000 3.500.000

LCD Projector Piece 1,0 5.000.000 5.000.000

Scanner Piece 1,0 600.000 600.000

Equipment Maintenance (Include existing equipment) Atcost - 15.000.000 0

2.8.1.3 Province North Sulawesi (Manado) 69.850.000

Desktop Computer Piece 3,0 4.500.000 13.500.000

Laptop/Notebook Piece 7,0 5.750.000 40.250.000

Printer Laser Jet Piece 2,0 2.000.000 4.000.000

Printer Color A3 Piece 1,0 3.000.000 3.000.000

Digital Camera Piece - 1.000.000 0

GPS tools Piece 1,0 3.500.000 3.500.000

LCD Projector Piece 1,0 5.000.000 5.000.000

Scanner Piece 1,0 600.000 600.000

Equipment Maintenance (Include existing equipment) Atcost - 15.000.000 0

2.8.1.4 Province West Sulawesi (Mamuju) 58.350.000

Desktop Computer Piece 3,0 4.500.000 13.500.000

Laptop/Notebook Piece 5,0 5.750.000 28.750.000

Printer Laser Jet Piece 2,0 2.000.000 4.000.000

Printer Color A3 Piece 1,0 3.000.000 3.000.000

Digital Camera Piece - 1.000.000 0

GPS tools Piece 1,0 3.500.000 3.500.000

LCD Projector Piece 1,0 5.000.000 5.000.000

Scanner Piece 1,0 600.000 600.000

Equipment Maintenance (Include existing equipment) Atcost - 15.000.000 0

2.8.1.5 Province Central Sulawesi (Palu) 58.350.000

Desktop Computer Piece 3,0 4.500.000 13.500.000

Laptop/Notebook Piece 5,0 5.750.000 28.750.000

Printer Laser Jet Piece 2,0 2.000.000 4.000.000

Printer Color A3 Piece 1,0 3.000.000 3.000.000

Digital Camera Piece - 1.000.000 0

GPS tools Piece 1,0 3.500.000 3.500.000

LCD Projector Piece 1,0 5.000.000 5.000.000

Scanner Piece 1,0 600.000 600.000

Equipment Maintenance (Include existing equipment) Atcost - 15.000.000 0 At cost (Invoice )

2.8.1.6 Province Gorontalo (Gorontalo) 58.350.000

Desktop Computer Piece 3,0 4.500.000 13.500.000

Laptop/Notebook Piece 5,0 5.750.000 28.750.000

Printer Laser Jet Piece 2,0 2.000.000 4.000.000

Printer Color A3 Piece 1,0 3.000.000 3.000.000

Digital Camera Piece - 1.000.000 0

GPS tools Piece 1,0 3.500.000 3.500.000

LCD Projector Piece 1,0 5.000.000 5.000.000

Scanner Piece 1,0 600.000 600.000

Equipment Maintenance (Include existing equipment) Atcost - 15.000.000 0

2.8.2 CITY COORDINATOR OFFICE 205.600.000

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

REMARKNo Description UnitCONTRACT AMENDMENT NO. 24

Vol Rate Amount (IDR)

REMARKNo Description Unit

2.8.2.1 Province South Sulawesi ( 6 City Coordinators ) 77.100.000

Laptop/Notebook Piece 6,0 5.750.000 34.500.000

Desktop Computer Piece 6,0 4.500.000 27.000.000

Printer Laser Jet Piece 6,0 2.000.000 12.000.000

Scanner Piece 6,0 600.000 3.600.000

2.8.2.2 Province South East Sulawesi (2 City Coordinators ) 25.700.000

Laptop/Notebook Piece 2,0 5.750.000 11.500.000

Desktop Computer Piece 2,0 4.500.000 9.000.000

Printer Laser Jet Piece 2,0 2.000.000 4.000.000

Scanner Piece 2,0 600.000 1.200.000

2.8.2.3 Province North Sulawesi (5 City Coordinators ) 64.250.000

Laptop/Notebook Piece 5,0 5.750.000 28.750.000

Desktop Computer Piece 5,0 4.500.000 22.500.000

Printer Laser Jet Piece 5,0 2.000.000 10.000.000

Scanner Piece 5,0 600.000 3.000.000

2.8.2.4 Province West Sulawesi (1 City Coordinators ) 12.850.000

Laptop/Notebook Piece 1,0 5.750.000 5.750.000

Desktop Computer Piece 1,0 4.500.000 4.500.000

Printer Laser Jet Piece 1,0 2.000.000 2.000.000

Scanner Piece 1,0 600.000 600.000

2.8.2.5 Province Central Sulawesi (2 City Coordinators ) 12.850.000

Laptop/Notebook Piece 1,0 5.750.000 5.750.000

Desktop Computer Piece 1,0 4.500.000 4.500.000

Printer Laser Jet Piece 1,0 2.000.000 2.000.000

Scanner Piece 1,0 600.000 600.000

2.8.2.3 Province Gorontalo 12.850.000

Laptop/Notebook Piece 1,0 5.750.000 5.750.000

Desktop Computer Piece 1,0 4.500.000 4.500.000

Printer Laser Jet Piece 1,0 2.000.000 2.000.000

Scanner Piece 1,0 600.000 600.000

2.8.3 ASSISTAN CD MANDIRI OFFICE 112.500.000

2.8.3.1 Province South Sulawesi ( 12 Assistant City Coordinators ) 54.000.000

Desktop Computer Piece 12,0 4.500.000 54.000.000

Printer Laser Jet Piece - 2.000.000 0

2.8.3.2 Province South East Sulawesi (6 Assistant City Coordinators ) 27.000.000

Desktop Computer Piece 6,0 4.500.000 27.000.000

Printer Laser Jet Piece - 2.000.000 0

2.8.3.3 Province North Sulawesi (2 Assistant City Coordinators ) 9.000.000

Desktop Computer Piece 2,0 4.500.000 9.000.000

Printer Laser Jet Piece - 2.000.000 0

2.8.3.4 Province West Sulawesi (2 Assisrtant City Coordinators ) 9.000.000

Desktop Computer Piece 2,0 4.500.000 9.000.000

Printer Laser Jet Piece - 2.000.000 0

2.8.3.5 Province West Sulawesi (2 Assisrtant City Coordinators ) 9.000.000

Desktop Computer Piece 2,0 4.500.000 9.000.000

Printer Laser Jet Piece - 2.000.000 0

2.8.3.6 Province Gorontalo 4.500.000

Desktop Computer Piece 1,0 4.500.000 4.500.000

Printer Laser Jet Piece - 2.000.000 0

2.8.4 SUPPORT TIM PERCEPATAN KOTA 288.750.000

Peta Citra Satelit (Scala 1 : 5000) - 100.000.000 0

- 66.000.000 0

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

Vol Rate Amount (IDR)

REMARKNo Description Unit

- 42.652.000 0

Laptop (rental) 60,0 1.750.000 105.000.000

Desktop Computer (rental) 75,0 1.250.000 93.750.000

Printer A3 (rental) 30,0 750.000 22.500.000

Alat Ukur (rental) 1,0 67.500.000 67.500.000

1.003.050.000

Fixed Rate

TOTAL

Vol Rate Amount (IDR)

2.9.1 OSP OFFICE SPACE (including furniture, AC etc) 1.975.518.000

space/m2 mth

2.9.1.1 Province South Sulawesi (Makassar) 216 25 M2/Month 14.841,2 45.000 667.854.000

2.9.1.2 Province South East Sulawesi (Kendari) 124 25 M2/Month 8.677,2 32.000 277.670.400

2.9.1.3 Province North Sulawesi (Manado) 124 25 M2/Month 8.662,2 40.000 346.488.000

2.9.1.4 Province West Sulawesi (Mamuju) 95 25 M2/Month 6.702,6 32.000 214.483.200

2.9.1.5 Province Central Sulawesi (Palu) 95 25 M2/Month 6.732,6 32.000 215.443.200

2.9.1.6 Province Gorontalo (Gorontalo) 95 25 M2/Month 6.702,6 32.000 214.483.200

2.9.1.7 For City Coordinators (17 Korkot) 17 25 Month 0,0 200.000 0

SUPPORT TIM PERCEPATAN

Province South Sulawesi (Makassar) 216,0 45.000 9.720.000

Province South East Sulawesi (Kendari) 216,0 32.000 6.912.000

Province North Sulawesi (Manado) 216,0 40.000 8.640.000

Province Central Sulawesi (Palu) 216,0 32.000 6.912.000

Province Gorontalo (Gorontalo) 216,0 32.000 6.912.000

2.9.2 4.155.000.000

unit mth

2.9.2.1 Province South Sulawesi (Makassar) 3 25 Car/Month 191,5 6.000.000 1.149.000.000

2.9.2.2 Province South East Sulawesi (Kendari) 2 25 Car/Month 135,5 6.000.000 813.000.000

2.9.2.3 Province North Sulawesi (Manado) 2 25 Car/Month 135,5 6.000.000 813.000.000

2.9.2.4 Province West Sulawesi (Mamuju) 1 25 Car/Month 74,0 6.000.000 444.000.000

2.9.2.5 Province Central Sulawesi (Palu) 1 25 Car/Month 78,0 6.000.000 468.000.000

2.9.2.6 Province Gorontalo (Gorontalo) 1 25 Car/Month 78,0 6.000.000 468.000.000

2.9.3 Car/Month 6.133.647.250

unit mth

2.9.3.1 Province South Sulawesi ( 6 City Coordinators ) 6 25 Car/Month 411,0 6.000.000 2.245.000.000

2.9.3.2 Province South East Sulawesi (2 City Coordinators ) 2 25 Car/Month 148,0 6.000.000 810.000.000

2.9.3.3 Province North Sulawesi (5 City Coordinators ) 5 25 Car/Month 325,0 6.000.000 1.774.500.000

2.9.3.4 Province West Sulawesi (1 City Coordinators ) 1 25 Car/Month 74,0 6.000.000 405.000.000

2.9.3.5 Province Central Sulawesi (2 City Coordinators ) 2 25 Car/Month 74,0 6.000.000 405.000.000

2.9.3.6 Province Gorontalo (1 City Coordinators ) 1 25 Car/Month 74,0 6.000.000 405.000.000

SUPPORT TIM PERCEPATAN KOTA

a. VEHICLES

Province South Sulawesi (Makassar) 1 4 3,0 6.000.000 17.500.000

Province South East Sulawesi (Kendari) 1 4 3,0 6.000.000 17.647.250

Province North Sulawesi (Manado) 1 4 3,0 6.000.000 18.000.000

Province Central Sulawesi (Palu) 1 4 3,0 6.000.000 18.000.000

Province Gorontalo (Gorontalo) 1 4 3,0 6.000.000 18.000.000

2.9.4 379.800.000

At cost (Rental Contract/Invoice/Payment Transfer Slip) unit mth

2.9.4.1 Province South Sulawesi ( 12 Assistant City Coordinators ) 12 25 MCycle/Month 629,0 300.000 188.700.000

2.9.4.2 Province South East Sulawesi (6 Assistant City Coordinators ) 6 25 MCycle/Month 150,0 300.000 45.000.000

2.9.4.3 Province North Sulawesi (2 Assistant City Coordinators ) 2 25 MCycle/Month 183,0 300.000 54.900.000

2.9.4.4 Province West Sulawesi (2 Assisrtant City Coordinators ) 2 25 MCycle/Month 77,0 300.000 23.100.000

2.9.4.5 Province Central Sulawesi (2 Assisrtant City Coordinators ) 2 25 MCycle/Month 149,5 300.000 45.000.000

2.9.4.6 Province Gorontalo (1 Assisrtant City Coordinators ) 1 25 MCycle/Month 77,0 300.000 23.100.000

12.643.965.250

Fixed Rate

Fixed Rate

REMARK

Fixed Rate

Fixed Rate

Fixed Rate

Fixed Rate

CONTRACT AMENDMENT NO. 24

2.9 RENTAL EXPENSES

No Description Unit

TOTAL

VEHICLES (Minimun Y 2010 - Included driver, O & M, Insurance etc) for OSP Office

VEHICLES (Minimun Y 2010 - Included driver, O & M, Insurance etc) for

City Coordinator Office

MOTORCYCLE (Minimun Y 2010 - Included O & M, Insurance etc)For Assistant CD

Mnandiri of City Coordinators

Vol Rate Amount (IDR)

2.10.1 REGULAR REPORT Time Eks 83.646.450

Inception Report 1 15 Expl 75 75.000 5.591.050

Monthly Report 15 15 Expl 720 35.000 25.200.000

Quarterly Report 6 15 Expl 315 75.000 23.605.400

Annual Report 2 15 Expl 30 100.000 3.000.000

Draft Final Report 1 20 Expl 55 150.000 8.250.000

Final Report (Indonesia & English) 1 40 Expl 80 200.000 16.000.000

Executive Summary (Indonesia & English) 1 40 Expl 40 50.000 2.000.000

2.10.2 SPECIAL REPORT Time Eks 10.450.000

Performance Evaluation of OSP 6 15 Expl 90 50.000 4.500.000

Training Activity Report 1 50 Expl 50 35.000 1.750.000

Complaint Resolution Follow-up Report 25 5 Expl 100 35.000 3.500.000

Workshop Findings and Results 1 20 Expl 20 35.000 700.000

94.096.450

Ceiling Rate

Remark

Ceiling Rate

CONTRACT AMENDMENT NO. 24

2.10 REPORTING EXPENSES

TOTAL

No Description Unit

Volume Rate Amount

3.2.1 IN REGIONAL LEVELS (Makasar)Time/

EventDays Ptcp Instr 9.000.000

OSP Coordination Meeting 2 2 14 4 Man/Days 36 250.000 9.000.000

Kits 19 Piece 0 50.000 0

Speaker honorarium 4 Person 0 500.000 0

3.2.2 IN PROVINCIAL LEVELS 300.821.050

a OSP Consolidation Province South Sulawesi 3 1 78 2 Man/Days 43 100.000 4.300.000

b OSP Consolidation Province South East Sulawesi 3 1 37 2 Man/Days 24 100.000 2.400.000

c OSP Consolidation Province North Sulawesi 3 1 48 2 Man/Days 75 100.000 7.500.000

d OSP Consolidation Province West Sulawesi 3 1 16 2 Man/Days 0 100.000 0

e OSP Consolidation Province Central Sulawesi 3 1 16 2 Man/Days 0 100.000 0

f OSP Consolidation Province Gorontalo 3 1 15 2 Man/Days 0 100.000 0

0 0 0

gAdvance Training/Couching PLPBK for City Coordinator Assistant

UP3 5 14 2 Man/Days 0 75.000 0

hTraining for City Coordinators Assistants (Infrastructure,

Economic, Community Dev, MIS, Urban Planner)1 3 103 6 Man/Days 126 175.000 22.050.000

i Special Training for Kelurahan Facilitators (Technic) 1 3 195 10 Man/Days 615 175.000 107.625.000

j Special Training for Kelurahan Facilitators (Economic) 1 3 128 7 Man/Days 360 175.000 56.146.800

k Special Training for Kelurahan Facilitators (Social) 1 3 183 9 Man/Days 360 175.000 61.424.250

l Special Training for Senior Facilitators 1 3 131 7 Man/Days 231 175.000 39.375.000

m Training of AKP & Planning for Local Goverment 1 5 88 5 Man/Days 0 175.000 0

n Special Training for Technical Team of PLPBK 1 4 87 6 Man/Days 0 175.000 0

Speaker honorarium 62 Person 0 500.000 0

3.2.3 In City/Regency Levels 55.187.300

a Thematic Discussion / Reflection of KBP 3 1 820 2 Man/Days 645 75.000 48.000.000

bConsolidation of Kelurahan Facilitators, City Coordinators

Assistants & City Coordinators 6 1 757 0 Man/Days 302 25.000 7.187.300

c Speaker honorarium 2 Person 0 500.000 0

365.008.350

Remark

Ceiling Rate

Ceiling Rate

CONTRACT AMENDMENT NO. 24

Ceiling Rate

3.1 BREAKDOWN OF TRAINING ACTIVITY 2012 [ FIXED ]

No Description Unit

TOTAL

Vol Rate Amount (IDR)

3.3.1 IN REGIONAL LEVELS (Makasar)Time/

EventDays Ptcp Instr 85.599.500

OSP Coordination Meeting 2 2 14 4 Man/Days 56 250.000 14.000.000

Kits 19 Piece 14 50.000 700.000

Speaker honorarium 4 Person 0 500.000 0

KEGIATAN PELATIHAN MEI - DESEMBER 2015

OSP Coordination Meeting Man/Days 96 250.000 21.950.000

Kits Piece 48 50.000 949.500

Speaker honorarium Person 0 500.000 0

KEGIATAN PELATIHAN 2016

Konsolidasi OC/OSP 2 2 11 Man/Days 192 250.000 48.000.000 Ceiling Rate

3.3.2 IN PROVINCIAL LEVELS 4.583.172.100

a OSP Consolidation Province South Sulawesi 3 1 78 2 Man/Days 118 100.000 11.763.000

b OSP Consolidation Province South East Sulawesi 3 1 37 2 Man/Days 48 100.000 4.500.000

c OSP Consolidation Province North Sulawesi 3 1 48 2 Man/Days 17 100.000 1.700.000

OSP Consolidation Province West Sulawesi 3 1 16 2 Man/Days 16 100.000 1.600.000

OSP Consolidation Province Central Sulawesi 3 1 16 2 Man/Days 39 100.000 3.600.000

OSP Consolidation Province Gorontalo 3 1 15 2 Man/Days 15 100.000 1.400.000

d Advance Training/Couching PLPBK for City Coordinator Assistant UP (1x3x14x2) 3 5 14 2 Man/Days 0 75.000 0

e Special Training for Kelurahan Facilitators (Technic) 1 3 195 10 Man/Days 0 175.000 0

0 200.000 0

f Special Training for Kelurahan Facilitators (Economic) 1 3 128 7 Man/Days 0 175.000 0

0 200.000 0

g Special Training for Kelurahan Facilitators (Social) 1 3 183 9 Man/Days 0 175.000 0

0 200.000 0

h Special Training for Senior Facilitators 1 3 131 7 Man/Days 0 175.000 0

i Pelatihan Dasar Pemda 1 4 88 4 Man/Days 0 175.000 0

j Training of AKP & Planning for Local Goverment 1 5 88 2 Man/Days 0 175.000 0

k Training of Poverty Budgeting for Local Government 1 4 88 2 Man/Days 0 175.000 0

Speaker honorarium 53 Person 0 500.000 0

Koridor Baru (2013)

a Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder 1 2 39 2 Man/Days 0 175.000 0

b Pelatihan Penguatan Pemda dan stakeholder 1 5 254 18 Man/Days 0 175.000 0

c Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator 1 2 49 2 Man/Days 0 175.000 0

d Pelatihan Penguatan Askot dan fasilitator 1 5 622 49 Man/Days 0 175.000 0

e Konsolidasi Pemandu Pelatihan PLPBK 2 2 21 2 Man/Days 0 175.000 0

f Pelatihan Dasar PLPBK (Lokasi baru tahun 2012) 1 6 73 4 Man/Days 0 175.000 0

g Pelatihan Penguatan PLPBK (Lokasi baru 2012) 1 4 73 4 Man/Days 0 175.000 0

h Pelatihan Dasar PLPBK (Lokasi baru 2013) 1 6 128 9 Man/Days 0 175.000 0

i Pelatihan Penguatan PLPBK (lokasi baru 2013) 1 4 128 9 Man/Days 0 175.000 0

j Pelatihan Tim Teknis PLPBK (Lokasi baru 2013) 1 4 17 2 Man/Days 0 175.000 0

k Konsolidasi Pelatihan khusus Fasilitator 1 1 47 4 Man/Days 0 175.000 0

lTraining for City Coordinators Assistants (Infrastructure, Economic, Community Dev,

MIS, Urban Planner)1 3 96 6 Man/Days 0 175.000 0

Koridor Baru

a Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder 1 2 39 2 Man/Days 0 175.000 0

b Pelatihan Penguatan Pemda dan stakeholder 1 5 254 18 Man/Days 0 175.000 0

0 350.000 0

c Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator 1 2 49 2 Man/Days 0 175.000 0

d Pelatihan Penguatan Askot dan fasilitator 1 5 622 49 Man/Days 0 175.000 0

e Konsolidasi Pemandu Pelatihan PLPBK 2 2 21 2 Man/Days 0 175.000 0

f Pelatihan Dasar PLPBK (Lokasi baru tahun 2012) 1 6 73 4 Man/Days 0 175.000 0

g Pelatihan Penguatan PLPBK (Lokasi baru 2012) 1 4 73 4 Man/Days 0 175.000 0

h Pelatihan Dasar PLPBK (Lokasi baru 2013) 1 6 128 9 Man/Days 528 175.000 92.400.000

i Pelatihan Penguatan PLPBK (lokasi baru 2013) 1 4 128 9 Man/Days 0 175.000 0

j Pelatihan Tim Teknis PLPBK (Lokasi baru 2013) 1 4 17 2 Man/Days 0 175.000 0

0 350.000 0

k Konsolidasi Pelatihan khusus Fasilitator 1 1 47 4 Man/Days 0 175.000 0

lTraining for City Coordinators Assistants (Infrastructure, Economic, Community Dev,

MIS, Urban Planner)1 3 96 6 Man/Days 0 175.000 0

Konsolidasi Pemandu Pelatihan PLPBK 2 1 16 4 Man/Days 0 200.000 0

Pelatihan Dasar PLPBK 1 6 209 34 Man/Days 1.128 200.000 212.165.800

Pelatihan Penguatan PLPBK 1 4 209 34 Man/Days 0 200.000 0

Narasumber 10 Man 7 500.000 3.500.000

Konsolidasi Pemandu Pelatihan KSB (Kegiatan Sosial Berkelanjutan) 2 1 3 3 Man/Days 0 200.000 0

Pelatihan Dasar KSB 1 6 26 6 Man/Days 0 200.000 0

Pelatihan Penguatan KSB 1 3 26 6 Man/Days 0 200.000 0

Narasumber 2 Man 0 500.000 0

Pelatihan Penguatan PRBBK (Manado) 1 4 78 Man/Days 0 200.000 0

Bahan Serahan 1 78 Pcs 0 75.000 0

Narasumber 1 3 Man/Days 0 500.000 0

KEGIATAN PELATIHAN MEI - DESEMBER 2015

a.1 OSP Consolidation Province South Sulawesi 37 100.000 3.700.000

a.2 OSP Consolidation Province South East Sulawesi 25 100.000 2.500.000

a.3 OSP Consolidation Province North Sulawesi 26 100.000 2.600.000

a.4 OSP Consolidation Province West Sulawesi 16 100.000 1.600.000

a.5 OSP Consolidation Province Central Sulawesi 23 100.000 2.300.000

a.6 OSP Consolidation Province Gorontalo 24 100.000 2.400.000

b.1 Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan 57 175.000 9.975.000

b.2 Pelatihan Penguatan Program Lanjutan 3.345 175.000 585.275.000

c.1 Konsolidasi Pemandu Pelatihan Pemerintah Daerah 0 175.000 0

c.2 Pelatihan Pemerintah Daerah 0 350.000 0

d Pelatihan SIM 102 200.000 20.400.000

e Pelatihan Dasar PLPBK 0 200.000 0

f Pelatihan Penguatan PLPBK 477 200.000 93.478.300

g Pelatihan Tim Teknis Pemda 0 350.000 0

KEGIATAN PELATIHAN 2016

Konsolidasi /KBIK Provinsi 2 2 89 356 175.000 62.300.000 Ceiling Rate

Konsolidasi Pemandu Pelatihan Fasilitator 1 2 42 84 175.000 14.700.000 Ceiling Rate

Pelatihan Fasilitator 1 8 622 42 5.272 200.000 1.054.400.000 Ceiling Rate

3.2 BREAKDOWN OF TRAINING ACTIVITY 2013 [ FIXED ]

No Description Unit Remark

Ceiling Rate

Ceiling Rate

Ceiling Rate

Ceiling Rate

CONTRACT AMENDMENT NO. 24

Ceiling Rate

Ceiling Rate

Ceiling Rate

a. In Class training 6

b. On the job training (praktek lapang) : Sewa Bus 2 13 22 3.500.000 77.000.000 Ceiling Rate

Konsolidasi Pemandu Pelatihan khusus untuk Fasilitator 1 2 20 40 175.000 7.000.000 Ceiling Rate

Pelatihan khusus untuk fasilitator 1 6 250 20 240 200.000 48.000.000 Ceiling Rate

a. In Class training 4

b. On the job training (praktek lapang) : Sewa Bus 2 5 5 3.500.000 17.500.000 Ceiling Rate

Pelatihan perencanaan bagi TAPP (Khusus 40 Kota) 1 6 44 10 200 200.000 40.000.000 Ceiling Rate

Kits 1 6 50 60 50.000 3.000.000 Ceiling Rate

Speaker Honorarium 1 6 4 20 500.000 10.000.000 Ceiling Rate

Pelatihan Perhitungan luasan Kumuh untuk Fasilitator 1 2 44 10 0 200.000 0 Ceiling Rate

Kits 1 2 50 0 50.000 0 Ceiling Rate

Speaker Honorarium 1 2 4 0 500.000 0 Ceiling Rate

KEGIATAN PELATIHAN 2017

Konsolidasi/KBIK Provinsi 1 2 69 138 200.000 27.600.000 Ceiling Rate

Sulawesi Selatan 21

Sulawesi Tenggara 11

Sulawesi Tengah 9

Sulawesi Barat 7

Sulawesi Utara 14

Gorontalo 7

Konsolidasi Pelatihan Fasilitator 1 2 34 68 175.000 11.900.000 Ceiling Rate

Sulawesi Selatan 16

Sulawesi Tenggara 6

Sulawesi Tengah 4

Sulawesi Barat 2

Sulawesi Utara 4

Gorontalo 2

Pelatihan Askot dan Fasilitator (50 Kota) 1 8 410 34 3.552 200.000 710.400.000 Ceiling Rate

Kits 410 410 50.000 20.500.000 Ceiling Rate

Sulawesi Selatan 211 16

Sulawesi Tenggara 78 6

Sulawesi Tengah 32 4

Sulawesi Barat 15 2

Sulawesi Utara 47 4

Gorontalo 27 2

Pelatihan Khusus 1 3 19 6 0 200.000 0 Ceiling Rate

Kits 19 0 50.000 0 Ceiling Rate

Sulawesi Selatan 5 1

Sulawesi Tenggara 4 1

Sulawesi Tengah 2 1

Sulawesi Barat 2 1

Sulawesi Utara 4 1

Gorontalo 2 1

Konsolidasi Pelatihan Khusus Tim Korkot (Gelombang 2) 1 1 6 0 175.000 0 Ceiling Rate

TOT dan Pelatihan Khusus Tim Korkot (Gelombang 2) 1 5 28 6 0 250.000 0 Ceiling Rate

Konsolidasi Pelatihan Khusus Fasilitator 1 1 48 26 175.000 4.550.000 Ceiling Rate

Sulawesi Selatan (Makassar) 24

Sulawesi Tenggara (Kendari) 6

Sulawesi Tengah (Palu) 6

Sulawesi Utara (Manado) 6

Gorontalo 6

Pelatihan Khusus Fasilitator 1 5 366 48 1.601 200.000 320.200.000 Ceiling Rate

Kits 366 302 50.000 15.100.000 Ceiling Rate

Sulawesi Selatan (Makassar) 183 24

Sulawesi Tenggara (Kendari) 78 6

Sulawesi Tengah (Palu) 27 6

Sulawesi Utara (Manado) 51 6

Gorontalo 27 6

Assessment/Recruitment Team Facilitator 939 220.515.000

I. Sulawesi Selatan 91.920.000 0

1 Koordinator Kota dan Askot CD Mandiri 1 2 42 84 200.000 16.800.000 Ceiling Rate

2 Asisten Koordinator Kota 1 2 36 72 200.000 14.400.000 Ceiling Rate

3 Senior Fasilitator (SF) 1 1 69 69 175.000 12.075.000 Ceiling Rate

4 Fasilitator 1 1 255 255 175.000 44.625.000 Ceiling Rate

5 Penggandaan (Fotocopy) 1 402 402 10.000 4.020.000 Ceiling Rate

II. Sulawesi Tenggara 37.105.000

1 Koordinator Kota dan Askot CD Mandiri 1 2 12 24 200.000 4.800.000 Ceiling Rate

2 Asisten Koordinator Kota 1 2 23 46 200.000 9.200.000 Ceiling Rate

3 Senior Fasilitator (SF) 1 1 25 25 175.000 4.375.000 Ceiling Rate

4 Fasilitator 1 1 98 98 175.000 17.150.000 Ceiling Rate

5 Penggandaan (Fotocopy) 1 158 158 10.000 1.580.000 Ceiling Rate

III. Sulawesi Tengah 15.295.000

1 Koordinator Kota dan Askot CD Mandiri 1 2 9 18 200.000 3.600.000 Ceiling Rate

2 Asisten Koordinator Kota 1 2 8 16 200.000 3.200.000 Ceiling Rate

3 Senior Fasilitator (SF) 1 1 10 10 175.000 1.750.000 Ceiling Rate

4 Fasilitator 1 1 35 35 175.000 6.125.000 Ceiling Rate

5 Penggandaan (Fotocopy) 1 62 62 10.000 620.000 Ceiling Rate

IV. Sulawesi Barat 9.440.000

1 Koordinator Kota dan Askot CD Mandiri 1 2 6 12 200.000 2.400.000 Ceiling Rate

2 Asisten Koordinator Kota 1 2 8 16 200.000 3.200.000 Ceiling Rate

3 Senior Fasilitator (SF) 1 1 5 5 175.000 875.000 Ceiling Rate

4 Fasilitator 1 1 15 15 175.000 2.625.000 Ceiling Rate

5 Penggandaan (Fotocopy) 1 34 34 10.000 340.000 Ceiling Rate

V. Sulawesi Utara 53.985.000

1 Koordinator Kota dan Askot CD Mandiri 1 2 21 42 200.000 8.400.000 Ceiling Rate

2 Asisten Koordinator Kota 1 2 29 58 200.000 11.600.000 Ceiling Rate

3 Senior Fasilitator (SF) 1 1 36 36 175.000 6.300.000 Ceiling Rate

4 Fasilitator 1 1 145 145 175.000 25.375.000 Ceiling Rate

5 Penggandaan (Fotocopy) 1 231 231 10.000 2.310.000 Ceiling Rate

VI. Gorontalo 12.770.000

1 Koordinator Kota dan Askot CD Mandiri 1 2 6 12 200.000 2.400.000 Ceiling Rate

2 Asisten Koordinator Kota 1 2 8 16 200.000 3.200.000 Ceiling Rate

3 Senior Fasilitator (SF) 1 1 8 8 175.000 1.400.000 Ceiling Rate

4 Fasilitator 1 1 30 30 175.000 5.250.000 Ceiling Rate

5 Penggandaan (Fotocopy) 1 52 52 10.000 520.000 Ceiling Rate

KEGIATAN 2018

Coaching Penyiapan Kegiatan Infrasturktur 1 3 86 0 175.000 0 Ceiling Rate

Sulawesi Selatan 22

Sulawesi Tenggara 17

Sulawesi Tengah 11

Sulawesi Utara 17

Sulawesi Barat 9

Gorontalo 10

KBIK Provinsi 1 2 84 168 200.000 33.600.000 Ceiling Rate

Sulawesi Selatan (Makassar) 23

Sulawesi Tenggara (Kendari) 13

Sulawesi Tengah (Palu) 12

Sulawesi Utara (Manado) 16

Sulawesi Barat (Mamuju) 9

Gorontalo 11

Konsolidasi Pelatihan Khusus Fasilitator 1 2 46 92 175.000 16.100.000 Ceiling Rate

Sulawesi Selatan (Makassar) 46

Sulawesi Tenggara (Kendari) 18

Sulawesi Tengah (Palu) 8

Sulawesi Utara (Manado) 4

Sulawesi Barat (Mamuju) 10

Gorontalo 2

4

Pelatihan Khusus Fasilitator 1 6 581 46 3.762 200.000 752.400.000 Ceiling Rate

a. In Class training 4

b. On the job training (praktek lapang) : Sewa Bus 2 12 24 3.500.000 84.000.000 Ceiling Rate

Kits 581 581 50.000 29.050.000 Ceiling Rate

Sulawesi Selatan (Makassar) 252 18

Sulawesi Tenggara (Kendari) 114 8

Sulawesi Tengah (Palu) 41 4

Sulawesi Utara (Manado) 121 10

Sulawesi Barat (Mamuju) 15 2

Gorontalo 38 4

Pelatihan SIM 1 4 34 2 144 200.000 28.800.000 Ceiling Rate

Kits 34 34 50.000 1.700.000 Ceiling Rate

Sulawesi Selatan (Makassar) 10 0

Sulawesi Tenggara (Kendari) 6 0

Sulawesi Tengah (Palu) 4 0

Sulawesi Utara (Manado) 6 0

Sulawesi Barat (Mamuju) 4 0

Gorontalo 4 0

3.3.3 In City/Regency Levels 453.530.900

a Thematic Discussion / Reflection of KBP 3 1 820 2 Man/Days 299 75.000 16.928.100

b Consolidation of Kelurahan Facilitators, City Coordinators Assistants & City Coordinators 6 1 757 0 Man/Days 1.106 25.000 26.899.800

c Speaker honorarium 2 Person 0 500.000 0

0 0 0

Pelatihan Pemerintah Daerah PRBBK (Lokasi Pilot Manado) 1 3 36 Man/Days 0 350.000 0

Kits 1 36 Pcs 0 50.000 0

Speaker Honorarium 1 4 Man/Days 0 500.000 0

KEGIATAN PELATIHAN MEI - DESEMBER 2015

a Thematic Discussion / Reflection of KBP 0 75.000 0

b Consolidation of Kelurahan Facilitators, City Coordinators Assistants & City Coordinators 327 25.000 8.160.500

c Speaker honorarium 0 500.000 0

KEGIATAN PELATIHAN 2016

Konsolidasi /KBIK Kabupaten 4 1 622 1.920 25.000 46.742.500 Ceiling Rate

Diskusi tematik di Kota/Kabupaten 2 1 160 720 75.000 54.000.000 Ceiling Rate

2. Pelatihan Pokja PKP 1 2 20 10 0 350.000 0 Ceiling Rate

Coaching Clinic 5 1 206 1.030 175.000 180.250.000 Ceiling Rate

Speaker honorarium 5 1 50 50 500.000 25.000.000 Ceiling Rate

KEGIATAN 2018

Coaching Penyiapan Kegiatan Infrasturktur 2 2 507 147 175.000 25.725.000 Ceiling Rate

Sulawesi Selatan (Makassar, Gowa, Pare Pare, Palopo, Bulukumba, Bantaeng, Wajo) 210

Sulawesi Tenggara (Kendari, Kolaka, Muna, Bau Bau) 103

Sulawesi Tengah (Palu, Toli Toli) 39

Sulawesi Utara (Manado, Bitung, Tomohon, Kota Kotamubagu) 106

Sulawesi Barat (Majene) 14

Gorontalo (Kota Gorontalo dan Kab. Gorontalo) 35

Coaching Clinic (di Provinsi Sulawesi Selatan : Kota Makassar) 1 3 133 0 399 175.000 69.825.000 Ceiling Rate

Coaching Clinic (Pokja PKP, OPD, Korkot, Askot dan Fasilitator)

5.122.302.500TOTAL

Ceiling Rate

Ceiling Rate

Ceiling Rate

Vol Rate Amount (IDR)

4.1 PROVINCIAL LEVELS (Prov Sulsel, Sultra, Sulut, Sulbar,

Sulteng & Gorontalo)

Prov/City/

Reg Days

Time/

Event Ptcp 727.345.200

4.1.1 Lokakarya Review Propinsi/midterm 460.345.200

Workshop Activities (6x2x1x75) 6 2 1 60 Man/Days 900 250.000 225.000.000

Press Conference 6 1 1 10 Man/Days 36 200.000 7.200.000

Provincial Key Speakers 6 1 1 3 Man/Days 16 500.000 8.000.000

Workshop Kits 6 1 1 83 Piece 481 50.000 23.549.200

KEGIATAN MEI - DESEMBER 2015

1.1 Lokakarya Sosialisasi Kumuh Kegiatan Lokakarya 600 250.000 150.000.000

Press Conference 29 200.000 5.800.000

Nara Sumber Provinsi 18 500.000 9.000.000

Kits Lokakarya 714 50.000 31.796.000

4.1.2 Workshop Media -

Workshop Activities 6 2 1 20 Man/Days 0 250.000 0

Provincial Key Speakers 6 1 1 2 Man/Days 0 500.000 0

Workshop Kits 6 1 1 25 Piece 0 50.000 0

1.2 KEGIATAN MEI - DESEMBER 2015

Workshop Media

Workshop Activities 0 250.000 0

Provincial Key Speakers 0 500.000 0

Workshop Kits 0 50.000 0

4.1.3 Articles/News 6 1 2 1 Time 7 500.000 3.500.000

4.1.4 TV Talkshow 6 1 2 1 Time 6 1.000.000 6.000.000

KEGIATAN MEI - DESEMBER 2015

1.3 Penulisan Artikel / Berita 0 500.000 0

1.4 TV Talkshow 3 1.000.000 3.000.000

4.2 CITY/REGENCY LEVELS 1.811.772.173

4.2.1 Workshop on Midterm Review 7.000.000

Workshop Activities (41x2x1x50) 41 2 1 35 Man/Days 70 100.000 7.000.000

Press Conference (41x1x1x5) 41 1 1 10 Man/Days 0 100.000 0

Provincial Key Speakers (41x1x1x3) 41 1 1 2 Man/Days 0 300.000 0

4.2.1.a Orientation Workshop of PLPBK -

Workshop Activities 41 1 1 50 Man/Days 0 100.000 0

Press Conference 41 1 1 5 Man/Days 0 100.000 0

Provincial Key Speakers 14 1 1 1 Man/Days 0 300.000 0

4.2.2 Radio Talkshow 41 1 6 - Time 71 500.000 33.500.000 Ceiling Rate

4.2.3 Media Field Visit 41 1 3 - Time 51 500.000 23.000.000 Ceiling Rate

4.2.4 Articles/News 41 1 4 - Time 60 500.000 27.500.000 Ceiling Rate

4.2.5 Exibithion 41 1 1 - Time 4 5.000.000 13.500.000 Ceiling Rate

KEGIATAN MEI - DESEMBER 2015

2.1 Lokakarya Sosialisasi Kumuh 962.424.850

- Kegiatan Lokakarya 3.600 250.000 872.382.400

- Press Conference 10 100.000 1.000.000

- Nara Sumber Provinsi 5 300.000 1.500.000

- Kits Lokakarya 1.800 50.000 87.542.450

2.2 Lokakarya PLPBK 0 100.000 0

2.3 Radio Talkshow 4 500.000 2.000.000

2.4 Media Field Visit 12 500.000 6.000.000

2.5 Penulisan Berita 1 500.000 500.000

IV. SOCIALIZATION ACTIVITY EXPENSES [ FIXED ]

No Description Unit Remark

Ceiling Rate

Ceiling Rate

Ceiling Rate

Ceiling Rate

Ceiling Rate

Ceiling Rate

CONTRACT AMENDMENT NO. 24

2.6 Exhibition 1 5.000.000 5.000.000

KEGIATAN 2016

A. PROVINCE LEVEL 89.500.000

1. Lokakarya Provinsi

a. Accomodation 1 2 1 130 260 250.000 65.000.000

b. Resources Person 6 2 1 3 36 500.000 18.000.000

d. Kits 1 1 1 135 130 50.000 6.500.000

B. CITY/REGENCY LEVELS 731.347.323

1. Lokakarya Strategi Komunikasi

a. Accomodation 32 2 1 57 992 100.000 98.340.500

b. Resources Person 32 2 1 3 92 300.000 27.600.000

d. Kits 32 1 1 60 992 50.000 47.394.630

2. Lokakarya Khusus

a. Accomodation 5 1 1 57 285 100.000 28.500.000

b. Resources Person 5 2 1 3 15 300.000 4.500.000

c. Press Conference 5 1 1 3 15 100.000 1.500.000

d. Kits 5 1 1 60 300 50.000 15.000.000

3. Workshop (Forum Konsultansi) 5 2 4 30 780 350.000 273.000.000

4. Penayangan di TV Berita daerah 6 1 2 1 12 10.000.000 120.000.000 Ceiling Rate

5. Pengembangan Newsletter 32 1 4 400 24.000 1.500 35.976.000 Ceiling Rate

6. Exhibition 32 1 1 1 16 5.000.000 79.536.193 Ceiling Rate

C Dokumen RPLP/RTPLP 2.000.000.000 Fixed Rate

1 Tenaga Ahi Pendampingan Masyarakat 120 5.000.000 600.000.000 Fixed Rate

2 Sosialisasi Tingkat Kelurahan 40 5.000.000 200.000.000 Fixed Rate

3 Forum Konsutasi dan Uji Publik 40 5.000.000 200.000.000 Fixed Rate

4 Peralatan Survey, Dukungan FGD/Rembug dan 40 15.000.000 600.000.000 Fixed Rate

Penggandaan Dokumen RPLP dan Peta

5 Penguatan Masyarakat/TIPP atau DED (Opsional) 40 10.000.000 400.000.000 Fixed Rate

KEGIATAN 2018

A. PROVINCE LEVEL

1 Exhibition 165.000.000

a. Lokasi Prioritas 5 - - - 5 30.000.000 150.000.000 Fixed Rate

b. Non Lokasi Prioritas 1 - 1 15.000.000 15.000.000 Fixed Rate

4.539.117.373

Ceiling Rate

Ceiling Rate

TOTAL

Ceiling Rate

Ceiling Rate