(LPS-2) GOR ACEH BESAR 10 12 2015.pdf

104
7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 1/104 Perencanaan Pembangunan Sarana dan Prasarana Olahraga Kabupaten Aceh Besar  Desember 2015

Transcript of (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

Page 1: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 1/104

Perencanaan Pembangunan Sarana dan Prasarana Olahraga 

Kabupaten Aceh Besar 

 Desember 2015

Page 2: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 2/104

Page 2 of 34

Daftar Isi

1.  Parameter Perencanaan

3. Plat Lantai

4.  Analisa Struktur 

5.  Perhitungan Balok dan Kolom

6. Perhitungan Pondasi

2.

Pemodelan dan Pembebanan

Page 3: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 3/104

KATA PEGANTAR

Sehubungan dengan pelaksanaan pekerjaan Perencanaan Pembangunan Sarana dan

Prasarana Olahraga yang berlokasi di Kabupaten Aceh Besar , bersama ini kami sampaikan

Laporan Perhitungan Struktur sebagai dokument pelengkap.

Perhitungan Struktur ini dibuat  berdasarkan Peraturan, Standar dan Pedoman yang berlaku di Indonesia 

disertai referensi referensi yang mendukung.

Demikian Laporan Perhitungan Struktur ini kami sampaikan, atas perhatian dan kerja samanya

kami ucapkan terima kasih.

Medan, Desember 2015

PT. Citra Rancang Global

D.I.

 Structure Engineer

Page 4: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 4/104

1

parameterperencanaan

Page 5: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 5/104

PARAMETER PERENCANAAN

DATA BANGUNAN

Bangunan yang akan didisain memiliki  2  lantai  dengan fungsi

sebagai gedung olahraga (stadion). Atap menggunakan rangka baja (truss system).

SISTEM STRUKTUR

Sistem struktur yang direncanakan adalah Portal Beton Bertulang dengan lantai

plat beton sebagai pengaku (diafragma) bagunan. Plat lantai didisan sebagai plat dua arah.

Pondasi yang digunakan adalah tiang pancang.

SPESIFIKASI, STANDARD DAN PEDOMAN.

1. Peraturan Pembebanan Indonesia Untuk Gedung 1983

2. Peraturan Perencanaan Bangunan Baja Indonesia (PPBBI)

3. Tata Cara Perhitungan Struktur Beton untuk Bangunan Gedung, SNI 03-2847-2002

4. Tata Cara Perencanaan Ketahanan Gempa untuk Struktur Bangunan Gedung dan Non Gedung

, SNI 03-1726-20012

5. Peraturan dan ketentuan lain yang relevan.

MUTU DAN BAHAN YANG DIGUNAKAN :

1. Beton

a. Mutu : K-250

b. Ec = 4700 Vf’c

c. Poison Ratio = 0,2

2. Baja tulangan :

a. Untuk Ø< 13mm Baja Tulangan Polos (BJTP24) dimana f y=2900 kg/cm2  dan f u  = 3900

kg/cm2

b. Untuk Ø> 13mm Baja Tulangan Ulir (BJTD40) dimana f y=4000 kg/cm2  dan f u  = 5700

kg/cm2

PEMBEBANAN :

1. Beban mati :

a. Beban ceiling = 11 kg/m2

b. Beban screed keramik = 21 kg/m2

c. Beban finishing lantai keramik = 24 kg/m2

d. Beban partisi = 25 kg/m2

e. Beban M/E = 40 kg/m2

f. Beban dinding ½ batu bata = 250 kg/m2

d. Berat jenis = 2400 kg/m3

a. Berat jenis = 7800 kg/m3

g. Berat air = 1000 kg/m3

200.784 kg/cm2

Page 6: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 6/104

  Analisa struktur dilakukan sebagai portal dengan pemodelan 3 Dimensi menggunakan

program struktur ETABS dengan mempertimbangkan metode SRPMK (Sistem Rangka

Pemikul Momen Khusus)

Kombinasi pembebanan sebagai berikut

U = 1.2 D + 1.6 L

U = 1.2 D + 1,0 Lr  + 1,0 Ex + 0,3 Ey

U = 0.9 D + Ex + 0,3 Ey

Dimana : D = Beban Mati

L = Beban Hidup,

Lr = Beban Hidup Reduksi,

E = Beban Gempa

DESIGN STRUKTUR BANGUNAN

Design struktur dilakukan dengan bantuan program ETABS dengan mengacu

pada metodeSTRONG COLUMN WEAK BEAM

.

 ANALISA STRUKTUR BANGUNAN

3. Beban gempa :

2. Beban hidup :

-Lantai Atribun penonton = 400 kg/m2

-Lantai Kendaraan = 800 kg/m2

-Lantai Atap = 100 kg/m2

Beban gempa dihitung berdasarkan

Page 7: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 7/104

BEBAN 

PADA 

LANTAI 

 ATRIBUN

Tinggi =   315 cm

Lebar injakan =   80 cm

Tinggi injakan =   45 cm 1800

Tebal tangga =   12 cm 0.18

Berat anak tangga 1.26 x 2.4

5.6

0.54 t/m'

Jumlah anak = 7 bh

α = 29.36 °

sin α = 0.49

cos α = 0.87 642.5 cm (diagonal)

tan α = 0.56

Tinggi ekuivalen

180/cos α x t = 0,5 x b x h x 6

SUPERDEAD

* Bs plat = 1/cos a 0.12 1 2400 = 330.4 kg/m'

q1   = 330.4 kg/m'

 Anak  Tangga

* Anak tangga = = 540.0 kg/m'

* Tpt duduk = = 25.0 kg/m'

* Keramik = 66 1 = 66 kg/m'

q2   = 631.0 kg/m' (ETABS INPUT)

LIVE 

LOAD

* B. hidup =   400   1 = 400.0 kg/m' (ETABS INPUT)

Page 8: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 8/104

Lokasi :

Fungsi Bangunan :

Klasifikasi Bangunan : III

Jenis Tanah :

Struktur Bangunan :  Beton

Jumlah  Lantai :  2

Tinggi Bangunan  (m) :  6

Tinggi  Antar Lantai (m) :  3

Sistem Penahan Gaya Seismik  :

Rangka Beton Bertulang Pemikul Momen Khusus

Faktor Keutamaan

 Bangunan

 : 1. 25

Kategori Resiko : III   (Sumber PPUGI. 1987)

Reduksi Beban Hidup u/ Peninjauan  G em pa 0 .5   (Sumber PPUGI. 1987)

Reduksi Beban Hidup u/ Disain Balok  Induk  dan Por ta l 0 .9

V : 0 .0 96

 ANALISA PERHITUNGAN GEMPA

(SE)Tanah Lunak 

 Aceh Besar

Stadion

Parameter SS dan S1 ditetapkan berdasarkan respons spektrum percepatan 0,2 detik dan 1 detik dalam peta gerak tanah seismik dengan kemungkinan 2

persen terlampaui dalam 50 tahun sesuai dengan lokasi yang ditinjau

1. Parameter percepatan tanah SS (percepatan batuan dasar periode pendek 0,2 detik) dan S1 (percepatan batuan dasar periode 1,0 detik).

Sistem Rangka Pemikul Momen

 Ss = 1.349

 

S1 

0.642

Page 9: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 9/104

2. KLASIFIKASI SITUS

N spt    =   ‐ 

Jenis tanah   =

http://puskim.pu.go.id/Aplikasi/desain_spektra_indonesia_2011/

Ss   =   1.35   (sumber  :  peta  zona  2012)

SMS   =   Fa   Ss

= 0.9 1.349

=   1.21

http://puskim.pu.go.id/Aplikasi/desain_spektra_indonesia_2011/

S1   =   0.642   (sumber  :  peta  zona  2012)

SM1   =   Fv   S1

= 2.4 0.642

=   1.5408

4. Parameter percepatan spektrum desain (SDS, SD1)

SDS   =   2/3 SMS   SD1   =   2/3 SM1

=   2/3 1.2141   =   2/3 1.5408 Tabel Graphic Respon Spectrum

=   0.81   =   1.03   T Sa

0 0.32

To   =   0.2   SD1   Ts   =   SD1   0.2 5 0.81

SDS   SDS   1.3 0.81

1.6 0.63

= 0.2 1.03 = 1.03 2.0 0.510.81 0.81 3.0 0.34

= 0.25 dtk = 1.3 dtk  

1. KATEGORI BANGUNAN : III

Tanah Lunak 

3. Faktor koefisien situs (Fa, Fv) dan Parameter spektrum respons percepatan yang disesuaikan dengan pengaruh klasifikasi situs 

(SMS, SM1).

0.32

0.81 0.81

0.63

0.51

0.34

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

0 0.5 1 1.5 2 2.5 3 3.5

    S   p   e   c   t   r   a    R   e   s   p   o   n   s    A   c   c   e    l   e   r   a   t   i   o   n    (   g    )

Period, T ( det)

Respons Spectra Graphic

Page 10: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 10/104

2. FAKTOR KEUTAMAAN GEMPA (I)  : 1.25

3a. KATEGORI RESIKO BANGUNAN : D

3b. KATEGORI RESIKO BANGUNAN : D

Page 11: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 11/104

2c. KATEGORI RESIKO BANGUNAN  RENCANA : D

Dipakai sistem =   Sistem Rangka Pemikul Momen Khusus (SRPMK)

3. KOEFISIEN REDUKSI GEMPA (R)  =   8.00

Page 12: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 12/104

Wak tu Get ar R en ca na : Ct    Hnx

SD1Koefisien

CuTipe Struktur Ct x

> 0.4 1.4

0.3 1.4

0.2 1.5

0.15 1.6 Rangka baja pemikul momen 0.0724 0.8

< 0.1 1.7 Rangka beton pemikul momen 0.0466 0.9

Rangka baja dengan bresing eksentris 0.0731 0.75

Rangka baja dengan bresing terkekang terhadap te kuk  0.0731 0.75

Semua sistem struktur lainnya 0.0488 0.75

Ta   :   Ct    Hnx

:   0.0466 6  0.9

:   0.234 dt  

x y

T =   0 . 23 4 0 .2 34

C =   0.77 0.77

Tx *   =   0.234   det    (*Tabel  Modal  ParticipationMass Ratio)   Ty *   =   0.234   det 

Cx   =   0.77 Cx   = 0.77

V   =   CR

Vx   =   0.77   Vy   =   0.77

8 8

=   0.096   =   0.096

Tabel X. Nilai parameter periode pendekatan Ct dan

x (Sumber : SNI 03-1726-2012)

Tabel X. Koefisien batas atas periode (Sumber :

SNI 03-1726-2012)

Sistem rangkapemikul momen di mana rangkamemikul 100persengaya gempa

yang disyaratkan dan tidak dilingkupi atau dihubungkan dengan komponen yang

lebih kaku dan akan mencegah rangka dari defleksi jika dikenai gaya gempa:

0.32

0.81 0.81

0.63

0.51

0.34

Tx: 

0.23 

Cx: 

0.77

Ty:0.23 

Cy: 

0.77

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

0 0.5 1 1.5 2 2.5 3

    S   p   e   c   t   r   a    R   e   s   p   o   n   s    A   c   c   e    l   e   r   a   t   i   o   n    (   g    )

Period, 

det)

Page 13: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 13/104

2

pemodelandan

pembebanan

Page 14: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 14/104

 A B C D E F G H

1

2

3

4

5

6

7

8

9

10

11

   B   2   0   /   4   0

B20/40   B   2   0   /   4   0

B20/35

B20/35

B20/35

B20/35B20/35

B25/45

   B   3   0   /   5   0

B25/45B25/45

B30/45

   B   3   0   /   5   0

   B   2   5   /   4   5

   B   2   5   /   4   5

   B   2   5   /   4   5

   B   2   5   /   4   5

   B   2   5   /   4   5

   B   2   5   /   5   0

   B   2   5   /   5   0

   B   2   5

   /   5   0

B30/50B30/50B30/50B30/50

   B   2   5   /   5   0

   B   2   5   /   5   0

   B   2   5   /   5   0

   B   2   5   /   5   0

B25/50

B25/50

B25/50

B25/50

B25/50

   B   2   5

   /   5   0

   B   2   5   /   5   0

   B   2   5   /   5   0

   B   2   5   /   5   0

   B   2   5   /   5   0

B   2   5    /   5   0   

B25/50

B25/50

B25/50

B25/50

B25/50

B30/50

   B   2   5   /   5   0

   B   2   5   /   5   0

   B   2   5   /   5   0

   B   2   5   /   5   0

   B   2   5   /   5   0

   B   2   5   /   5   0

B30/50B30/50B30/50B30/50B30/50

   B   3   0   /   5   0

   B   3   0   /   5   0

   B   3   0   /   5   0

   B   3   0   /   5   0

   B   3   0   /   5   0

   B   3   0   /   5   0

   B   3   0   /   5   0

   B   3   0   /   5   0

   B   3   0   /   5   0

   B   3   0   /   5   0

   B   3   0   /   5   0

   B   3   0   /   5   0

    B    3    0    /   4    5

  B  3  0  / 4

  5

B30/45

B  3  0   /   4  5  

B    3    0     /    4    

5    

B30/45

B30/45

B    3    0     /    4    

5    

B  3  0   /   4  5  

B30/45

  B  3  0  / 4

  5

    B    3    0    /   4    5

B30/45

B30/45

   B   3   0   /   4   5

   B   3   0   /   4   5

   B   3   0   /   4   5

   B   3   0   /   4   5

   B   3   0   /   4   5

   B   3   0   /   4   5

B30/45B30/45B30/45B30/45B30/45

B30/45B30/45B30/45B30/45B30/45

   1   6 .   2

   0   5   (  m   )

   4   (  m   )

   6   (  m   )

   6   (  m   )

   6   (  m   )

   6   (  m   )

   6   (  m   )

   6   (  m   )

   6   (  m   )

   4   (  m   )

4 (m) 6 (m) 6 (m) 6 (m) 6 (m) 6 (m) 4 (m)

X

Y

ETABS 2015 15.0.0

Page 15: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 15/104

k    4     0     

k     4      0      

  k     4     0

       k      4      0

       k       4       0

k       4       0       

K   4   0    /   6   0      K

  4  0   /  6

  0

 K 40/60   K 40 /60

      B      2      5      /       5      0

      B      2      5       /       5       0 

      B      2      5      /      5      0

B      2      

 5       /       5       0      

B       2      5      

 /      5      0      

b       2       5       

b       2       5       

       b       2       5

        b       2       5 

        b         2        5 

 b       2       

 5       

K    4   0     /    6   0       K

   4   0   /   6   0 B 2 5/ 5

 0B 2 5  / 45 

 B 25/5 0B 2 5  / 45 

 B 25/5 0B2 5  / 45 

 B 25/5 0B2 5  / 45 

B25/50B25 / 45

K   4  0    /   6   0      K  4  0  /  6  0B 25/50B2 5 / 45

B25/50B25 /45

K  4  0   /  6  0  

K 4 0  / 6 0 

  K 4  0 /  6

  0

 K 4 0/ 6 0

B25/50B25 /45

B25/50B25/ 45

B25/50B25/45

B25/50B25/45

B25 / 40B25/45

  K 4 0 /6 0

  K  4 0   /  6  0  B25 / 50B25/45

   K  4  0  /  6  0 k   4   

0       k   4   0   k      

4      0      

       k      4      0

B20/35B20/35B20/35B20/35B20/35

      B      2      5      /      5      0

      B      2      5      /      5      0

      B      2      5      /      5      0

      B      2      5      /      5      0

      B      2      5      /      5      0

      b      2      5

      b      2      5

      b      2      5

      b      2      5

      b      2      5

      b      2      5

B30/50B30/50B30/50B30/50B30/50

      B      3      0      /      5      0

      B      3      0      /      5      0

      B      3      0      /      5      0

      B      3      0      /      5      0

      B      3      0      /      5      0

      B      3      0      /      5      0

      B      3      0      /      5      0

      B      3      0      /      5      0

      B      3      0      /      5      0

      B      3      0      /      5      0

      B      3      0      /      5      0

      B      3      0      /      5      0

X

Y

X

Z

Y

Z

ETABS 2015 15.0.0 12/10/2

GOR ACEH BESAR 15 06 2014 (8).EDB 3-D View

Page 16: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 16/104

Page 17: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 17/104

 A

4

B

4

C

4

D

4

E

4

F

4

1   6   1   1   

1   6   1   0   

1   6   0   9   

1   6   0   8   

1   6   0   7    

1   6   0   6   

1   6   0   5    

1   6   0   4   

1   6   0   3   

1

   1   5   1

   6

   1   5   1   5

   1   5   1  4

   1   5   1

   3

   1   5   1   2

   1   5   1   1

   1   5   1

   0

   1   5   0   9

   1   5   0   8

   1   5   0    7

   1   5   0   6

   1   5   0   5

   1   5   0

  4

   1   5   0   3

   1   5   0   2

   1   5   0

   1

   1   5   0   0

   1  4   9   9

   1  4    7   9

        1        5        9        3

        1        5        9        2

        1        5        9        1

        1        5        9        0

        1        5        8        9

        1        5        8        8

        1        5        8        7

        1        5        8        6

        1        5        8        5

        1        4        9        8

        1        4        9        7

        1        4        9        6

        1        4        9        5

        1        4        9        4

        1        4        9        3

        1        4        9        2

        1        4        9        1

        1        4        9        0

        1        4        8        9

        1        4        8        8

        1        4        8        7

        1        4        8        6

        1        4        8        5

        1        4        8        4

        1        4        8        3

        1        4        8        2

        1        4        8        1

        1        4        8        0

        1        4        7        8

16 48  16 47    16 46  16 45    16 44 16 43    16 42  16 41   16 40  16 3 9    16 3 8    16 3 7    16 3 6  16 3 5    16 3 4 16 3 3    16 3 2  16 3 1 16 3 0 

15 7 2 15 7 1

15 7 0  15 6 9 15 6 8  15 6 7 

15 6 6  15 6 5 15 6 4

15

155 3

155 21551

155 0154 9

15 4 815 4 7

15 4 615 45

15 4 415 4 315 4 2

15 41

15 4 015 3 9

15 3 815 3 7

15 3 615 35

15 3 415 3 3

15 3 215 3115 3 0

15 2 915 2 815 2 7

15 2 615 25

15 2 4

15 2 315 2 2

15 21152 0

151 9151 8

151 7

1 4 7 71 4 7 6

1 4 751 4 7 4

1 4 7 31 4 7 2

1 4 711 4 7 0

1 4 6 91 4 6 8

1 4 6 71 4 6 6

1 4 651 4 6 4

1 4 6 31 4 6 2

1 4 611 4 6 0

1 45 9

2  3  4  

        2        3        1

232

2  3  3  

        2        8        4

        3        3        9

        3        3        8

        3        3        7

        3        3        6

        2        8        3

        3        6

204203202201

X

Z

ETABS 2015 15.0.0

MODEL.EDB Elevation View - T1-G1-4

Page 18: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 18/104

3

platlantai

Page 19: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 19/104

PERENCANAAN LANTAI BETON BERTULANG

ENONTON 

PARAMETER  PERENCANAAN

‐ Mutu beton K   250

‐ Mutu baja : BJTP‐24 L1 :   3   m

f y   =   2900   kg/cm2 L2 :   4   m

f u   =   3900   kg/cm2

PERHITUNGAN  PLAT 

x

x = menerus

Lx =   3.00   m x x

Ly

Lx

x

Ly = 4.00 m

Menentukan tebal plat 

h min 1   = Lx   0.4 + f  y

28   700

= 300 0.4 + 390

28 700

= 10.255 cm

h min 2   = L = 300 = 8.57 cm

35 35

Ly   4

Lx   3

= 1.33

h min 3   = 12 cm

h rencana   = 12.00 ~   13   cm

Berat sendiri =   0.13   2400 =   kg/m2

Screed + 3cm   y    = kg/m2

Finishing lantai   y    = kg/m2

Partisi   y    = kg/m2

Plafon + Rangka + Penggantung   y    = kg/m2

Armatur + Elektrikal   y    = kg/m2

Instalasi Plumbing   y    = kg/m2

Wd   = ~490 kg/m2

Wsuper   = kg/m2

Detail design plat 

Wl   =   400   kg/m2   (  

PPPUG 

1983)

q = 1.2 Wd   + 1.6 Wl

= 1.2 489 + 1.6 400

=   kg/m2

Mlx   = 0.001 889.00 3

  2

31 =   kg/m

2

Mly   = 0.001 889.00 3  2

19 =   kg/m2

Mtx   = 0.001 889.00 3  2

69 =   kg/m2

Mty   = 0.001 889.00 3  2

57 =   kg/m2

Arah x dan y

b = 100 cm   (  

Lebar  

 plat  

 per  

strook  

m)

d = 13 cm   (  Tebal   plat  lantai)

Ø = 0.8   (  Koefisien reduksi)

p = 2.5 cm

d' = 10.00 cm

M max   = kg m

1.30

=

25

177

31266

552.07

248.03

889.00

489

11

25

40

10

1.33

456.06

552.07

152.02

1

Page 20: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 20/104

PERENCANAAN LANTAI BETON BERTULANG

ENONTON 

R n   =

  b   d 2

=

0.9 100 10.0

= 6.1

m =

0.85 f'c

=

0.85 207.5

= 16.44

  = 1   *

m

= 1   * 0.0354

20.16

= 0.0018

r    = 1.33  

=   0.00234

min   = 1.4

fy

= 1.4

290

= 0.0048

As   =   pakai   b d 

= 0.00483 100 10.0

= 4.83 cm2163

D ipak ai Ø   10   ‐   150   (untuk   2 lapis dan  2 arah)

‐ Kontrol Plat  Terhadap Deflection

f x   = 5 q   L4

f izin

384 E Ix

= 5 8.1E+09 1

384 360

=   0.24   cm < 0.83 cm ……………… OK 

T=13cm

Ø10‐300

Ø10‐300

Ø10‐300

Sket  Penulangan Lantai

<

2900

f y

55,207

Mn

       Ø       1       0   ‐       3       0       0

       Ø       1       0   ‐       3       0       0

       Ø       1       0   ‐       3       0       0

< 300210,000

8.890

18,308.33 

 

  

 

  fy

 Rnm **211

2

Page 21: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 21/104

PERENCANAAN  LANTAI BETON BERTULANG

LANTAI KENDARAAN

PARAMETER PERENCANAAN

‐ Mutu beton K   250

‐ Mutu baja : BJTP‐24 L1 :   4   m

f y   =   2900   kg/cm2 L2 :   3   m

f u   =   3900   kg/cm2

PERHITUNGAN PLAT 

x

x = menerus

Lx =   3.00   m x x

Ly

Lx

x

Ly = 4.00  m

Menentukan tebal plat 

h min 1   = Lx   0.4 + f  y

28   700

= 300 0.4 + 390

28 700

= 10.255 cm

h min 2   = L = 300 = 8.57 cm

35 35

Ly   4

Lx   3

= 1.33

h min 3   = 10 cm

h rencana   = 10.26 ~   17.5   cm

Berat sendiri =   0.18   2400 =   kg/m2

Screed + 3cm   y    = kg/m2

Armatur + Elektrikal   y    = kg/m2

Instalasi Plumbing   y    = kg/m2

Water proofing   y    = kg/m2

Tangki Air 2000 ltr   y    = kg/m2

Wd   = kg/m2

Wsuper   = kg/m2

Detail design plat 

Wl   =   800   kg/m2   (  

Menurut  

Peraturan 

Muatan 

Indonesia)

q = 1.2 Wd   + 1.6 Wl

= 1.2 1850.2 + 1.6 800

= kg/m2

Mlx   = 0.001 2650.22 3  2

31 =   kg/m2

Mly   = 0.001 2650.22 3  2

19 =   kg/m2

Mtx   = 0.001 2650.22 3  2

69 =   kg/m2

Mty   = 0.001 2650.22 3  2

57 =   kg/m2

Arah x dan y

b = 100 cm   (  Lebar   plat   per  strook  1 m)

d = 17.5 cm   (  

Tebal  

 plat  

lantai)

Ø = 0.8   (  Koefisien reduksi)

p = 2.5 cm

d' = 14.40 cm

M max   = kg m

R n   =

  b   d 2

1.33   1.30

=

1430.2

1299.2

66

15

10

420

1645.79

40

1850.2

2650.22

739.41

453.191645.79

1359.56

Mn

3

Page 22: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 22/104

PERENCANAAN  LANTAI BETON BERTULANG

LANTAI KENDARAAN

=

0.9 100 14.4

= 8.8

m =

0.85 f'c

=

0.85 207.5

= 16.44

  = 1   *

m

= 1   * 0.0513

20.16

= 0.0025

r    = 1.33  

=   0.00339

min   = 1.4

fy

= 1.4290

= 0.0048

As   =   pakai   b d 

= 0.00483 100 14.4

= 6.95 cm2163

Dipak ai Ø   12   ‐   150   (untuk  

 2 

lapis 

dan 

 2 

arah)

‐ Kontrol Plat  Terhadap Deflection

f x   = 5 q   L4

f izin

384 E Ix

= 5 8.1E+09 1384 360

=   0.30   cm < 0.83 cm …………… OK 

T=17.5cm

Ø12‐300

Ø12-300

Ø12‐300

Sket  Penulangan Lantai

164,579

f y

2900

<

<

26.502 300210,000 44,661.46 

       Ø       1       2   ‐       1       5

       0

       Ø       1       2   ‐       1       5

       0

       Ø       1       2   ‐       1       5       0

 

  

 

  fy

 Rnm **211

4

Page 23: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 23/104

PERENCANAAN  LANTAI BETON BERTULANG

TANGKI AIR KAP. 2X1M3

PARAMETER PERENCANAAN

‐ Mutu beton K   250

‐ Mutu baja : BJTP‐24 L1 :   2.5   m

f y   =   2900   kg/cm2 L2 :   3   m

f u   =   3900   kg/cm2

PERHITUNGAN PLAT 

x

x = menerus

Lx =   2.50   m x x

Ly

Lx

x

Ly = 3.00  m

Menentukan tebal plat 

h min 1   = Lx   0.4 + f  y

28   700

= 250 0.4 + 390

28 700

= 8.5459 cm

h min 2   = L = 250 = 7.14 cm

35 35

Ly   3

Lx   2.5

= 1.20

h min 3   = 10 cm

h rencana   = 10.00 ~   13.0   cm

Berat sendiri =   0.13   2400 =   kg/m2

Screed + 3cm   y    = kg/m2

Armatur + Elektrikal   y    = kg/m2

Instalasi Plumbing   y    = kg/m2

Water proofing   y    = kg/m2

Tangki Air 2000 ltr   y    = kg/m2

Wd   = kg/m2

Wsuper   = kg/m2

Detail design plat 

Wl   =   666.67   kg/m2   (  

Menurut  

Peraturan 

Muatan 

Indonesia)

q = 1.2 Wd   + 1.6 Wl

= 1.2 1742.2 + 1.6 666.7

= kg/m2

Mlx   = 0.001 2408.89 2.5  2

28 =   kg/m2

Mly   = 0.001 2408.89 2.5  2

20 =   kg/m2

Mtx   = 0.001 2408.89 2.5  2

64 =   kg/m2

Mty   = 0.001 2408.89 2.5  2

56 =   kg/m2

Arah x dan y

b = 100 cm   (  Lebar   plat   per  strook  1 m)

d = 13 cm   (  

Tebal  

 plat  

lantai)

Ø = 0.8   (  Koefisien reduksi)

p = 2.5 cm

d' = 10.00 cm

M max   = kg m

R n   =

  b   d 2

312

1.20   1.20

=

66

10

40

843.11

15

1299.2

1742.2

1430.2

2408.89

421.56

301.11963.56

963.56

Mn

5

Page 24: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 24/104

PERENCANAAN  LANTAI BETON BERTULANG

TANGKI AIR KAP. 2X1M3

=

0.9 100 10.0

= 10.7

m =

0.85 f'c

=

0.85 207.5

= 16.44

  = 1   *

m

= 1   * 0.0627

20.16

= 0.0031

r    = 1.33  

=   0.00413

min   = 1.4

fy

= 1.4290

= 0.0048

As   =   pakai   b d 

= 0.00483 100 10.0

= 4.83 cm2163

Dipak ai Ø   10   ‐   150   (untuk  

 2 

lapis 

dan 

 2 

arah)

‐ Kontrol Plat  Terhadap Deflection

f x   = 5 q   L4

f izin

384 E Ix

= 5 3.91E+09 1384 360

=   0.32   cm < 0.69 cm …………… OK 

T=13cm

Ø10‐300

Ø10-300

Ø10‐300

Sket  Penulangan Lantai

96,356

f y

2900

<

24.089 < 250210,000 18,308.33 

       Ø       1       0   ‐       1       5

       0

       Ø       1       0   ‐       1       5

       0

       Ø       1       0   ‐       1       5       0

 

  

 

  fy

 Rnm **211

6

Page 25: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 25/104

4

analisastruktur 

Page 26: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 26/104

DEFORMASI

Page 27: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 27/104

DIAGRAM

MOMEN LENTUR

Page 28: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 28/104

DIAGRAM

GAYA GESER

Page 29: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 29/104

TABLE:  Concrete Beam Flexure Envelope

Label Story Section Location (‐) Moment (‐) Combo (+) Moment (+) Combo

tonf ‐m tonf  ‐m

B3 T1‐Story3 B30/50 End‐I 2.6968 C02 1.5398 C02

B3 T1‐Story3 B30/50 Middle 0.9498 C02 7.0753 C02

B3 T1‐Story3 B30/50 End‐J 2.4522 C02 1.2261 C02

B4 T1‐Story3 B30/50 End‐I 0.6475 C06 0.4062 C03

B4 T1‐Story3 B30/50 Middle 0.1823 C04 0.7503 C02

B4 T1‐Story3 B30/50 End‐J 0.7291 C04 0.3646 C04B5 T1‐Story3 B30/50 End‐I 2.7649 C02 1.3824 C02

B5 T1‐Story3 B30/50 Middle 1.0832 C02 7.5409 C02

B5 T1‐Story3 B30/50 End‐J 2.9163 C02 1.6182 C02

B222 T1‐Story3 B25/45 End‐I 0.5691 C02 0.2846 C02

B222 T1‐Story3 B25/45 Middle 0.6326 C02 0.1904 C02

B222 T1‐Story3 B25/45 End‐J 0.7618 C02 0.3809 C02

B224 T1‐Story3 B25/50 End‐I 0.871 C02 0.4355 C02

B224 T1‐Story3 B25/50 Middle 0.7161 C02 0.2178 C02

B224 T1‐Story3 B25/50 End‐J 0.6341 C02 0.3171 C02

B225 T1‐Story3 B25/45 End‐I 0 C18 0.1313 C02

B225 T1‐Story3 B25/45 Middle 0.0554 C02 0.0554 C02

B225 T1‐Story3 B25/45 End‐J 0.2217 C02 0.1109 C02

B226 T1‐Story3 B25/50 End‐I 0.477 C02 0.2385 C02

B226 T1‐Story3 B25/50 Middle 0.2175 C02 0.1193 C02

B226 T1‐Story3 B25/50 End‐J 0.0462 C04 0.0231 C04

B227 T1‐Story3 B25/45 End‐I 0.2157 C02 0.1079 C02

B227 T1‐Story3 B25/45 Middle 0.3798 C02 0.1524 C02

B227 T1‐Story3 B25/45 End‐J 0.6096 C02 0.3048 C02

B228 T1‐Story3 B25/50 End‐I 0.9514 C02 0.4757 C02

B228 T1‐Story3 B25/50 Middle 0.6638 C02 0.2378 C02

B228 T1‐Story3 B25/50 End‐J 0.4491 C02 0.2245 C02

B229 T1‐Story3 B25/45 End‐I 0.2205 C02 0.1102 C02

B229 T1‐Story3 B25/45 Middle 0.3803 C02 0.1515 C02B229 T1‐Story3 B25/45 End‐J 0.6059 C02 0.3029 C02

B230 T1‐Story3 B25/50 End‐I 0.9654 C02 0.4827 C02

B230 T1‐Story3 B25/50 Middle 0.6817 C02 0.2413 C02

B230 T1‐Story3 B25/50 End‐J 0.471 C02 0.2355 C02

B231 T1‐Story3 B25/45 End‐I 0.2089 C02 0.1045 C02

B231 T1‐Story3 B25/45 Middle 0.3716 C02 0.15 C02

B231 T1‐Story3 B25/45 End‐J 0.6 C02 0.3 C02

B232 T1‐Story3 B25/50 End‐I 0.9778 C02 0.4889 C02

B232 T1‐Story3 B25/50 Middle 0.6896 C02 0.2444 C02

B232 T1‐Story3 B25/50 End‐J 0.4745 C02 0.2372 C02

B233 T1‐Story3 B25/45 End‐I 0 C18 0.2718 C02

B233 T1‐Story3 B25/45 Middle 0.0679 C02 0.1362 C02B233 T1‐Story3 B25/45 End‐J 0.0769 C03 0.0385 C03

B234 T1‐Story3 B25/50 End‐I 0.4163 C02 0.2082 C02

B234 T1‐Story3 B25/50 Middle 0.1599 C02 0.1041 C02

B234 T1‐Story3 B25/50 End‐J 0.0139 C13 0.0429 C04

B235 T1‐Story3 B25/45 End‐I 0.5275 C02 0.2637 C02

B235 T1‐Story3 B25/45 Middle 0.5737 C02 0.1714 C02

B235 T1‐Story3 B25/45 End‐J 0.6855 C02 0.3428 C02

B236 T1‐Story3 B25/50 End‐I 0.8109 C02 0.4055 C02

B236 T1‐Story3 B25/50 Middle 0.6696 C02 0.2027 C02

Page 30: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 30/104

B236 T1‐Story3 B25/50 End‐J 0.6013 C02 0.3007 C02

B237 T1‐Story3 B25/40 End‐I 0.3822 C02 0.3822 C02

B237 T1‐Story3 B25/40 Middle 0.3822 C02 1.4624 C02

B237 T1‐Story3 B25/40 End‐J 0.3822 C02 1.5789 C02

B238 T1‐Story3 B25/40 End‐I 0.1942 C02 0.0971 C02

B238 T1‐Story3 B25/40 Middle 0.1008 C02 0.1977 C02

B238 T1‐Story3 B25/40 End‐J 0.1011 C10 0.0883 C02

B239 T1‐Story3 B25/40 End‐I 0.1988 C02 0.0994 C02

B239 T1‐Story3 B25/40 Middle 0.1159 C02 0.1411 C02B239 T1‐Story3 B25/40 End‐J 0.1948 C02 0.0974 C02

B240 T1‐Story3 B25/40 End‐I 0.1861 C02 0.0931 C02

B240 T1‐Story3 B25/40 Middle 0.1229 C02 0.1472 C02

B240 T1‐Story3 B25/40 End‐J 0.2104 C02 0.1052 C02

B241 T1‐Story3 B25/40 End‐I 0.0787 C04 0.1347 C02

B241 T1‐Story3 B25/40 Middle 0.1171 C02 0.2358 C02

B241 T1‐Story3 B25/40 End‐J 0.2045 C02 0.1022 C02

B242 T1‐Story3 B25/40 End‐I 0.3318 C02 1.3917 C02

B242 T1‐Story3 B25/40 Middle 0.3318 C02 1.3045 C02

B242 T1‐Story3 B25/40 End‐J 0.3318 C02 0.3318 C02

B243 T1‐Story3 B25/40 End‐I 0.3718 C02 0.3718 C02

B243 T1‐Story3 B25/40 Middle 0.3718 C02 1.4441 C02

B243 T1‐Story3 B25/40 End‐J 0.3718 C02 1.5448 C02

B244 T1‐Story3 B25/40 End‐I 0.2076 C02 0.1038 C02

B244 T1‐Story3 B25/40 Middle 0.103 C02 0.1541 C02

B244 T1‐Story3 B25/40 End‐J 0.1159 C09 0.0854 C02

B245 T1‐Story3 B25/40 End‐I 0.2065 C02 0.1032 C02

B245 T1‐Story3 B25/40 Middle 0.108 C02 0.1101 C02

B245 T1‐Story3 B25/40 End‐J 0.1954 C02 0.0977 C02

B246 T1‐Story3 B25/40 End‐I 0.2124 C02 0.1062 C02

B246 T1‐Story3 B25/40 Middle 0.1225 C02 0.1088 C02

B246 T1‐Story3 B25/40 End‐J 0.2104 C02 0.1052 C02

B247 T1‐Story3 B25/40 End‐I 0.0956 C06 0.1247 C02B247 T1‐Story3 B25/40 Middle 0.1116 C02 0.1983 C02

B247 T1‐Story3 B25/40 End‐J 0.2066 C02 0.1033 C02

B248 T1‐Story3 B25/40 End‐I 0.3363 C02 1.4128 C02

B248 T1‐Story3 B25/40 Middle 0.3363 C02 1.3321 C02

B248 T1‐Story3 B25/40 End‐J 0.3363 C02 0.3363 C02

B117 T1‐Story3 B20/40 End‐I 0.9745 C02 0.4872 C02

B117 T1‐Story3 B20/40 Middle 1.1026 C02 0.3193 C02

B117 T1‐Story3 B20/40 End‐J 1.2774 C02 0.6387 C02

B118 T1‐Story3 B20/40 End‐I 1.1151 C02 0.5576 C02

B118 T1‐Story3 B20/40 Middle 0.9466 C02 0.2788 C02

B118 T1‐Story3 B20/40 End‐J 0.8248 C02 0.4124 C02

B119 T1‐Story3 B20/40 End‐I 0.7952 C02 0.3976 C02B119 T1‐Story3 B20/40 Middle 0.9213 C02 0.2735 C02

B119 T1‐Story3 B20/40 End‐J 1.0941 C02 0.547 C02

B120 T1‐Story3 B20/40 End‐I 0.9148 C02 0.4574 C02

B120 T1‐Story3 B20/40 Middle 0.75 C02 0.2287 C02

B120 T1‐Story3 B20/40 End‐J 0.632 C02 0.316 C02

B121 T1‐Story3 B20/40 End‐I 0.8664 C02 0.4332 C02

B121 T1‐Story3 B20/40 Middle 0.9854 C02 0.2878 C02

B121 T1‐Story3 B20/40 End‐J 1.1511 C02 0.5755 C02

B122 T1‐Story3 B20/40 End‐I 0.9268 C02 0.4634 C02

Page 31: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 31/104

B122 T1‐Story3 B20/40 Middle 0.7713 C02 0.2317 C02

B122 T1‐Story3 B20/40 End‐J 0.6625 C02 0.3312 C02

B123 T1‐Story3 B20/40 End‐I 0.88 C02 0.44 C02

B123 T1‐Story3 B20/40 Middle 0.9992 C02 0.2913 C02

B123 T1‐Story3 B20/40 End‐J 1.1651 C02 0.5825 C02

B124 T1‐Story3 B20/40 End‐I 0.9247 C02 0.4624 C02

B124 T1‐Story3 B20/40 Middle 0.77 C02 0.2312 C02

B124 T1‐Story3 B20/40 End‐J 0.662 C02 0.331 C02

B125 T1‐Story3 B20/40 End‐I 0.832 C02 0.416 C02B125 T1‐Story3 B20/40 Middle 0.9618 C02 0.2846 C02

B125 T1‐Story3 B20/40 End‐J 1.1384 C02 0.5692 C02

B126 T1‐Story3 B20/40 End‐I 0.897 C02 0.4485 C02

B126 T1‐Story3 B20/40 Middle 0.7314 C02 0.2242 C02

B126 T1‐Story3 B20/40 End‐J 0.6126 C02 0.3063 C02

B127 T1‐Story3 B20/40 End‐I 1.1274 C02 0.5637 C02

B127 T1‐Story3 B20/40 Middle 1.2612 C02 0.3604 C02

B127 T1‐Story3 B20/40 End‐J 1.4417 C02 0.7209 C02

B128 T1‐Story3 B20/40 End‐I 1.2223 C02 0.6111 C02

B128 T1‐Story3 B20/40 Middle 1.0498 C02 0.3056 C02

B128 T1‐Story3 B20/40 End‐J 0.9239 C02 0.462 C02

B203 T1‐Story3 B20/35 End‐I 0.1269 C02 0.5507 C02

B203 T1‐Story3 B20/35 Middle 0.2296 C02 0.4858 C02

B203 T1‐Story3 B20/35 End‐J 0.1269 C02 0.5129 C02

B204 T1‐Story3 B20/35 End‐I 0.0867 C02 0.4055 C02

B204 T1‐Story3 B20/35 Middle 0.1908 C02 0.3592 C02

B204 T1‐Story3 B20/35 End‐J 0.0867 C02 0.1954 C02

B205 T1‐Story3 B20/35 End‐I 0.0363 C02 0.2054 C02

B205 T1‐Story3 B20/35 Middle 0.2446 C02 0.1599 C02

B205 T1‐Story3 B20/35 End‐J 0.0363 C02 0.1914 C02

B206 T1‐Story3 B20/35 End‐I 0.0369 C02 0.1971 C02

B206 T1‐Story3 B20/35 Middle 0.2523 C02 0.1622 C02

B206 T1‐Story3 B20/35 End‐J 0.0369 C02 0.2078 C02B207 T1‐Story3 B20/35 End‐I 0.0994 C02 0.2033 C02

B207 T1‐Story3 B20/35 Middle 0.2155 C02 0.4075 C02

B207 T1‐Story3 B20/35 End‐J 0.0994 C02 0.4547 C02

B208 T1‐Story3 B20/35 End‐I 0.154 C02 0.592 C02

B208 T1‐Story3 B20/35 Middle 0.3211 C02 0.5812 C02

B208 T1‐Story3 B20/35 End‐J 0.154 C02 0.6548 C02

B214 T1‐Story3 B20/35 End‐I 0.1202 C02 0.5265 C02

B214 T1‐Story3 B20/35 Middle 0.1218 C06 0.4785 C02

B214 T1‐Story3 B20/35 End‐J 0.1202 C02 0.4169 C02

B221 T1‐Story3 B20/35 End‐I 0.0576 C02 0.2975 C02

B221 T1‐Story3 B20/35 Middle 0.0747 C02 0.2554 C02

B221 T1‐Story3 B20/35 End‐J 0.0576 C02 0.0637 C02B223 T1‐Story3 B20/35 End‐I 0.0326 C04 0.0674 C02

B223 T1‐Story3 B20/35 Middle 0.1117 C02 0.0269 C02

B223 T1‐Story3 B20/35 End‐J 0.0387 C03 0.0555 C02

B249 T1‐Story3 B20/35 End‐I 0.0379 C04 0.058 C02

B249 T1‐Story3 B20/35 Middle 0.1015 C02 0.023 C02

B249 T1‐Story3 B20/35 End‐J 0.0304 C03 0.0634 C02

B250 T1‐Story3 B20/35 End‐I 0.0567 C02 0.0567 C02

B250 T1‐Story3 B20/35 Middle 0.0779 C06 0.2531 C02

B250 T1‐Story3 B20/35 End‐J 0.0567 C02 0.2948 C02

Page 32: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 32/104

B251 T1‐Story3 B20/35 End‐I 0.1402 C02 0.4435 C02

B251 T1‐Story3 B20/35 Middle 0.1794 C02 0.5362 C02

B251 T1‐Story3 B20/35 End‐J 0.1402 C02 0.603 C02

B103 T1‐Story2 B30/50 End‐I 0.5307 C03 2.942 C02

B103 T1‐Story2 B30/50 Middle 0.5307 C03 3.838 C02

B103 T1‐Story2 B30/50 End‐J 1.9338 C07 0.9669 C07

B104 T1‐Story2 B30/50 End‐I 1.3649 C10 0.6824 C10

B104 T1‐Story2 B30/50 Middle 0.3412 C10 0.6154 C10

B104 T1‐Story2 B30/50 End‐J 1.0486 C07 0.5243 C07B105 T1‐Story2 B30/50 End‐I 1.1297 C10 0.5649 C10

B105 T1‐Story2 B30/50 Middle 0.2824 C10 0.5745 C10

B105 T1‐Story2 B30/50 End‐J 1.0822 C07 0.5411 C07

B106 T1‐Story2 B30/50 End‐I 1.1369 C10 0.5685 C10

B106 T1‐Story2 B30/50 Middle 0.2842 C10 0.6217 C10

B106 T1‐Story2 B30/50 End‐J 1.0493 C07 0.5246 C07

B107 T1‐Story2 B30/50 End‐I 1.1052 C10 0.5526 C10

B107 T1‐Story2 B30/50 Middle 0.3583 C07 0.5874 C07

B107 T1‐Story2 B30/50 End‐J 1.4334 C07 0.7167 C07

B108 T1‐Story2 B30/50 End‐I 2.2839 C10 1.142 C10

B108 T1‐Story2 B30/50 Middle 0.7663 C10 4.8263 C02

B108 T1‐Story2 B30/50 End‐J 0.6657 C10 3.726 C02

B152 T1‐Story2 B30/50 End‐I 0.4981 C08 2.5786 C02

B152 T1‐Story2 B30/50 Middle 0.4981 C08 3.4944 C02

B152 T1‐Story2 B30/50 End‐J 1.9925 C08 0.9963 C08

B153 T1‐Story2 B30/50 End‐I 1.1906 C09 0.5953 C09

B153 T1‐Story2 B30/50 Middle 0.2976 C09 0.568 C09

B153 T1‐Story2 B30/50 End‐J 1.1606 C08 0.5803 C08

B154 T1‐Story2 B30/50 End‐I 1.0967 C09 0.5484 C09

B154 T1‐Story2 B30/50 Middle 0.2861 C08 0.5913 C08

B154 T1‐Story2 B30/50 End‐J 1.1445 C08 0.5723 C08

B155 T1‐Story2 B30/50 End‐I 1.0709 C09 0.5354 C09

B155 T1‐Story2 B30/50 Middle 0.286 C08 0.6032 C08B155 T1‐Story2 B30/50 End‐J 1.1439 C08 0.5719 C08

B156 T1‐Story2 B30/50 End‐I 1.0446 C09 0.5581 C08

B156 T1‐Story2 B30/50 Middle 0.3709 C08 0.652 C08

B156 T1‐Story2 B30/50 End‐J 1.4836 C08 0.7418 C08

B157 T1‐Story2 B30/50 End‐I 2.2293 C09 1.1147 C09

B157 T1‐Story2 B30/50 Middle 0.7494 C09 4.6966 C02

B157 T1‐Story2 B30/50 End‐J 0.6556 C09 3.6311 C02

B209 T1‐Story2 B30/50 End‐I 0.8242 C03 3.3456 C03

B209 T1‐Story2 B30/50 Middle 1.4421 C04 3.153 C02

B209 T1‐Story2 B30/50 End‐J 2.12 C03 1.06 C03

B210 T1‐Story2 B30/50 End‐I 1.2271 C05 1.0348 C04

B210 T1‐Story2 B30/50 Middle 0.4435 C12 1.0336 C03B210 T1‐Story2 B30/50 End‐J 1.5131 C03 0.7566 C03

B211 T1‐Story2 B30/50 End‐I 1.4149 C05 0.7758 C03

B211 T1‐Story2 B30/50 Middle 0.366 C14 0.835 C05

B211 T1‐Story2 B30/50 End‐J 1.3947 C03 0.791 C05

B212 T1‐Story2 B30/50 End‐I 1.5324 C05 0.7662 C05

B212 T1‐Story2 B30/50 Middle 0.454 C14 1.0478 C05

B212 T1‐Story2 B30/50 End‐J 1.2142 C03 1.0591 C06

B213 T1‐Story2 B30/50 End‐I 2.1383 C05 1.0691 C05

B213 T1‐Story2 B30/50 Middle 1.4612 C06 3.1626 C02

Page 33: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 33/104

B213 T1‐Story2 B30/50 End‐J 0.8307 C05 3.3722 C05

B174 T1‐Story2 b25 End‐I 5.5008 C02 2.7504 C02

B174 T1‐Story2 b25 Middle 4.6078 C02 1.3752 C02

B174 T1‐Story2 b25 End‐J 1.3752 C02 1.3752 C02

B175 T1‐Story2 b25 End‐I 3.6085 C02 1.8043 C02

B175 T1‐Story2 b25 Middle 3.0598 C02 0.9021 C02

B175 T1‐Story2 b25 End‐J 0.9021 C02 0.9021 C02

B176 T1‐Story2 b25 End‐I 5.5098 C02 2.7549 C02

B176 T1‐Story2 b25 Middle 4.6459 C02 1.3775 C02B176 T1‐Story2 b25 End‐J 1.3775 C02 1.3775 C02

B177 T1‐Story2 b25 End‐I 5.5103 C02 2.7551 C02

B177 T1‐Story2 b25 Middle 4.6174 C02 1.3776 C02

B177 T1‐Story2 b25 End‐J 1.3776 C02 1.3776 C02

B178 T1‐Story2 b25 End‐I 5.5811 C02 2.7905 C02

B178 T1‐Story2 b25 Middle 4.7148 C02 1.3953 C02

B178 T1‐Story2 b25 End‐J 1.3953 C02 1.3953 C02

B179 T1‐Story2 b25 End‐I 3.6611 C02 1.8306 C02

B179 T1‐Story2 b25 Middle 3.1142 C02 0.9153 C02

B179 T1‐Story2 b25 End‐J 0.9153 C02 0.9153 C02

B180 T1‐Story2 B20/35 End‐I 0.1134 C02 0.5172 C02

B180 T1‐Story2 B20/35 Middle 0.1547 C07 0.7601 C02

B180 T1‐Story2 B20/35 End‐J 0.1712 C07 0.1134 C02

B181 T1‐Story2 B25/50 End‐I 4.6234 C02 2.3117 C02

B181 T1‐Story2 B25/50 Middle 4.0091 C02 1.1559 C02

B181 T1‐Story2 B25/50 End‐J 1.1559 C02 1.1559 C02

B182 T1‐Story2 B20/35 End‐I 0.166 C08 0.083 C08

B182 T1‐Story2 B20/35 Middle 0.1445 C08 0.1634 C02

B182 T1‐Story2 B20/35 End‐J 0.1662 C07 0.0831 C07

B183 T1‐Story2 B25/50 End‐I 4.6527 C02 2.4836 C02

B183 T1‐Story2 B25/50 Middle 4.3822 C02 1.2418 C02

B183 T1‐Story2 B25/50 End‐J 1.2418 C02 1.2418 C02

B184 T1‐Story2 B20/35 End‐I 0.1627 C08 0.0814 C08B184 T1‐Story2 B20/35 Middle 0.1421 C07 0.1335 C02

B184 T1‐Story2 B20/35 End‐J 0.1632 C07 0.0816 C07

B185 T1‐Story2 B25/50 End‐I 4.6886 C02 2.4983 C02

B185 T1‐Story2 B25/50 Middle 4.4247 C02 1.2491 C02

B185 T1‐Story2 B25/50 End‐J 1.2491 C02 1.2491 C02

B186 T1‐Story2 B20/35 End‐I 0.1684 C08 0.0842 C08

B186 T1‐Story2 B20/35 Middle 0.1537 C07 0.1686 C02

B186 T1‐Story2 B20/35 End‐J 0.1749 C07 0.0874 C07

B187 T1‐Story2 B25/50 End‐I 4.6297 C02 2.4719 C02

B187 T1‐Story2 B25/50 Middle 4.3597 C02 1.236 C02

B187 T1‐Story2 B25/50 End‐J 1.236 C02 1.236 C02

B188 T1‐Story2 B20/35 End‐I 0.1817 C08 0.1143 C02B188 T1‐Story2 B20/35 Middle 0.1642 C08 0.7954 C02

B188 T1‐Story2 B20/35 End‐J 0.1143 C02 0.5206 C02

B189 T1‐Story2 B25/50 End‐I 4.5156 C02 2.2578 C02

B189 T1‐Story2 B25/50 Middle 3.9012 C02 1.1289 C02

B189 T1‐Story2 B25/50 End‐J 1.1289 C02 1.1289 C02

B110 T1‐Story1 B30/50 End‐I 1.3514 C10 1.1452 C07

B110 T1‐Story1 B30/50 Middle 0.6991 C18 1.587 C07

B110 T1‐Story1 B30/50 End‐J 1.0125 C08 0.8251 C17

B111 T1‐Story1 B30/50 End‐I 1.1794 C09 0.7584 C16

Page 34: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 34/104

B111 T1‐Story1 B30/50 Middle 0.5023 C08 0.7062 C09

B111 T1‐Story1 B30/50 End‐J 1.2237 C07 0.8554 C18

B112 T1‐Story1 B30/50 End‐I 1.2376 C09 0.8863 C16

B112 T1‐Story1 B30/50 Middle 0.576 C18 0.7819 C07

B112 T1‐Story1 B30/50 End‐J 1.2984 C07 0.9329 C18

B113 T1‐Story1 B30/50 End‐I 1.2717 C09 0.9081 C16

B113 T1‐Story1 B30/50 Middle 0.5878 C18 0.7847 C07

B113 T1‐Story1 B30/50 End‐J 1.3369 C07 0.9611 C18

B114 T1‐Story1 B30/50 End‐I 1.3015 C09 0.9177 C16B114 T1‐Story1 B30/50 Middle 0.5834 C10 0.8142 C09

B114 T1‐Story1 B30/50 End‐J 1.1672 C07 0.9482 C10

B115 T1‐Story1 B30/50 End‐I 1.5405 C09 0.7702 C09

B115 T1‐Story1 B30/50 Middle 1.1808 C09 2.0982 C02

B115 T1‐Story1 B30/50 End‐J 0.5741 C02 2.2964 C02

B145 T1‐Story1 B30/50 End‐I 0.6624 C17 1.7736 C08

B145 T1‐Story1 B30/50 Middle 1.0258 C07 1.9828 C08

B145 T1‐Story1 B30/50 End‐J 1.3762 C08 0.6881 C08

B146 T1‐Story1 B30/50 End‐I 1.0272 C10 0.9475 C07

B146 T1‐Story1 B30/50 Middle 0.6103 C07 0.7756 C07

B146 T1‐Story1 B30/50 End‐J 1.3921 C08 0.8 C17

B147 T1‐Story1 B30/50 End‐I 1.1388 C10 1.0184 C08

B147 T1‐Story1 B30/50 Middle 0.6251 C07 0.88 C08

B147 T1‐Story1 B30/50 End‐J 1.4487 C08 0.8837 C17

B148 T1‐Story1 B30/50 End‐I 1.1822 C10 1.0241 C07

B148 T1‐Story1 B30/50 Middle 0.6039 C07 0.8668 C08

B148 T1‐Story1 B30/50 End‐J 1.4525 C08 0.9311 C17

B149 T1‐Story1 B30/50 End‐I 1.2161 C10 1.0196 C07

B149 T1‐Story1 B30/50 Middle 0.6557 C07 0.8218 C08

B149 T1‐Story1 B30/50 End‐J 1.3712 C08 0.8588 C17

B150 T1‐Story1 B30/50 End‐I 1.354 C10 0.8007 C15

B150 T1‐Story1 B30/50 Middle 1.081 C10 2.1543 C02

B150 T1‐Story1 B30/50 End‐J 0.5192 C09 2.1819 C02B160 T1‐Story1 B30/50 End‐I 2.1666 C05 4.1554 C02

B160 T1‐Story1 B30/50 Middle 1.381 C02 5.1422 C02

B160 T1‐Story1 B30/50 End‐J 5.5238 C02 3.3341 C02

B161 T1‐Story1 B30/50 End‐I 3.6556 C02 6.0573 C02

B161 T1‐Story1 B30/50 Middle 0.9497 C04 6.0466 C02

B161 T1‐Story1 B30/50 End‐J 2.2322 C02 1.1161 C02

B162 T1‐Story1 B30/50 End‐I 0.812 C05 0.6533 C04

B162 T1‐Story1 B30/50 Middle 0.3439 C11 0.6772 C06

B162 T1‐Story1 B30/50 End‐J 0.7947 C03 0.6762 C06

B163 T1‐Story1 B30/50 End‐I 2.3239 C02 1.162 C02

B163 T1‐Story1 B30/50 Middle 1.0471 C06 5.8694 C02

B163 T1‐Story1 B30/50 End‐J 2.8993 C02 5.8785 C02B164 T1‐Story1 B30/50 End‐I 4.6339 C02 2.3169 C02

B164 T1‐Story1 B30/50 Middle 1.1585 C02 3.4708 C02

B164 T1‐Story1 B30/50 End‐J 1.1585 C02 2.7049 C02

B215 T1‐Story1 B25/50 End‐I 4.0837 C02 3.5853 C02

B215 T1‐Story1 B25/50 Middle 1.1043 C02 3.8495 C02

B215 T1‐Story1 B25/50 End‐J 4.4171 C02 3.2265 C02

B216 T1‐Story1 B25/50 End‐I 4.5785 C02 2.7957 C02

B216 T1‐Story1 B25/50 Middle 1.1446 C02 3.3543 C02

B216 T1‐Story1 B25/50 End‐J 3.2696 C07 2.8684 C02

Page 35: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 35/104

B217 T1‐Story1 B25/50 End‐I 2.7845 C10 1.3922 C10

B217 T1‐Story1 B25/50 Middle 0.8584 C02 1.1213 C10

B217 T1‐Story1 B25/50 End‐J 1.2531 C07 1.1628 C10

B218 T1‐Story1 B25/50 End‐I 2.8184 C09 1.4092 C09

B218 T1‐Story1 B25/50 Middle 0.8818 C02 1.1514 C09

B218 T1‐Story1 B25/50 End‐J 1.1913 C08 1.2 C09

B219 T1‐Story1 B25/50 End‐I 4.8396 C02 2.9156 C02

B219 T1‐Story1 B25/50 Middle 1.2099 C02 3.9388 C02

B219 T1‐Story1 B25/50 End‐J 1.7437 C08 3.4669 C02B220 T1‐Story1 B25/50 End‐I 4.2101 C02 3.592 C02

B220 T1‐Story1 B25/50 Middle 1.0525 C02 3.9757 C02

B220 T1‐Story1 B25/50 End‐J 3.7085 C02 3.4944 C02

B136 T1‐Story1 B25/50 End‐I 1.4659 C02 0.7329 C02

B136 T1‐Story1 B25/50 Middle 1.671 C02 0.4688 C02

B136 T1‐Story1 B25/50 End‐J 1.8751 C02 0.9375 C02

B137 T1‐Story1 B25/50 End‐I 1.5492 C02 0.7746 C02

B137 T1‐Story1 B25/50 Middle 1.7905 C02 0.5032 C02

B137 T1‐Story1 B25/50 End‐J 2.0127 C02 1.0063 C02

B138 T1‐Story1 B25/50 End‐I 1.5438 C02 0.7719 C02

B138 T1‐Story1 B25/50 Middle 1.7877 C02 0.5028 C02

B138 T1‐Story1 B25/50 End‐J 2.0112 C02 1.0056 C02

B139 T1‐Story1 B25/50 End‐I 1.5406 C02 0.7703 C02

B139 T1‐Story1 B25/50 Middle 1.7827 C02 0.5013 C02

B139 T1‐Story1 B25/50 End‐J 2.0052 C02 1.0026 C02

B140 T1‐Story1 B25/50 End‐I 1.5131 C02 0.7566 C02

B140 T1‐Story1 B25/50 Middle 1.7184 C02 0.4807 C02

B140 T1‐Story1 B25/50 End‐J 1.9226 C02 0.9613 C02

B141 T1‐Story1 B25/50 End‐I 2.0712 C02 0.6304 C02

B141 T1‐Story1 B25/50 Middle 2.1418 C02 0.6304 C02

B141 T1‐Story1 B25/50 End‐J 2.5217 C02 1.2608 C02

B142 T1‐Story1 B25/50 End‐I 2.4836 C02 1.2418 C02

B142 T1‐Story1 B25/50 Middle 2.0305 C02 0.6209 C02B142 T1‐Story1 B25/50 End‐J 1.3273 C02 0.6636 C02

B143 T1‐Story1 B25/50 End‐I 1.8903 C02 0.9451 C02

B143 T1‐Story1 B25/50 Middle 1.6134 C02 0.4726 C02

B143 T1‐Story1 B25/50 End‐J 1.2626 C02 0.6313 C02

B144 T1‐Story1 B25/50 End‐I 1.8821 C02 0.9411 C02

B144 T1‐Story1 B25/50 Middle 1.6034 C02 0.4705 C02

B144 T1‐Story1 B25/50 End‐J 1.2491 C02 0.6245 C02

B158 T1‐Story1 B25/50 End‐I 2.1702 C02 1.0851 C02

B158 T1‐Story1 B25/50 Middle 1.6825 C02 0.5426 C02

B158 T1‐Story1 B25/50 End‐J 0.9102 C02 0.4551 C02

B159 T1‐Story1 B25/50 End‐I 0.9455 C02 0.4727 C02

B159 T1‐Story1 B25/50 Middle 0.689 C02 0.6395 C11B159 T1‐Story1 B25/50 End‐J 0.4185 C02 0.6293 C11

B166 T1‐Story1 B25/50 End‐I 2.1291 C02 1.0646 C02

B166 T1‐Story1 B25/50 Middle 1.905 C02 0.5323 C02

B166 T1‐Story1 B25/50 End‐J 1.6597 C02 0.8298 C02

B167 T1‐Story1 B25/50 End‐I 2.1277 C02 1.0639 C02

B167 T1‐Story1 B25/50 Middle 1.903 C02 0.5319 C02

B167 T1‐Story1 B25/50 End‐J 1.6567 C02 0.8284 C02

B168 T1‐Story1 B25/50 End‐I 2.1397 C02 1.0698 C02

B168 T1‐Story1 B25/50 Middle 1.9175 C02 0.5349 C02

Page 36: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 36/104

B168 T1‐Story1 B25/50 End‐J 1.6761 C02 0.8381 C02

B169 T1‐Story1 B25/50 End‐I 1.9504 C02 0.9752 C02

B169 T1‐Story1 B25/50 Middle 1.7479 C02 0.4876 C02

B169 T1‐Story1 B25/50 End‐J 1.5461 C02 0.7731 C02

B165 T1‐Story1 B25/50 End‐I 1.9854 C02 0.9927 C02

B165 T1‐Story1 B25/50 Middle 1.7797 C02 0.4963 C02

B165 T1‐Story1 B25/50 End‐J 1.5715 C02 0.7858 C02

B170 T1‐Story1 B25/50 End‐I 1.5814 C02 0.7907 C02

B170 T1‐Story1 B25/50 Middle 1.8039 C02 0.5042 C02B170 T1‐Story1 B25/50 End‐J 2.0166 C02 1.0083 C02

B171 T1‐Story1 B25/50 End‐I 1.5972 C02 0.7986 C02

B171 T1‐Story1 B25/50 Middle 1.8355 C02 0.5141 C02

B171 T1‐Story1 B25/50 End‐J 2.0562 C02 1.0281 C02

B172 T1‐Story1 B25/50 End‐I 1.5981 C02 0.799 C02

B172 T1‐Story1 B25/50 Middle 1.8369 C02 0.5145 C02

B172 T1‐Story1 B25/50 End‐J 2.0579 C02 1.029 C02

B173 T1‐Story1 B25/50 End‐I 1.6168 C02 0.8084 C02

B173 T1‐Story1 B25/50 Middle 1.8399 C02 0.5132 C02

B173 T1‐Story1 B25/50 End‐J 2.053 C02 1.0265 C02

B190 T1‐Story1 B30/50 End‐I 1.154 C14 3.5395 C03

B190 T1‐Story1 B30/50 Middle 2.2126 C03 2.7513 C04

B190 T1‐Story1 B30/50 End‐J 3.1991 C04 2.1712 C14

B191 T1‐Story1 B30/50 End‐I 2.9871 C06 2.6692 C11

B191 T1‐Story1 B30/50 Middle 1.5734 C14 1.9502 C03

B191 T1‐Story1 B30/50 End‐J 2.9484 C04 2.4406 C13

B192 T1‐Story1 B30/50 End‐I 2.8972 C06 2.464 C11

B192 T1‐Story1 B30/50 Middle 1.4207 C13 1.745 C06

B192 T1‐Story1 B30/50 End‐J 2.8876 C04 2.4701 C13

B193 T1‐Story1 B30/50 End‐I 2.9371 C06 2.4354 C12

B193 T1‐Story1 B30/50 Middle 1.5816 C12 1.8823 C05

B193 T1‐Story1 B30/50 End‐J 3.0124 C04 2.5893 C13

B195 T1‐Story1 B30/50 End‐I 3.0629 C05 2.1694 C12B195 T1‐Story1 B30/50 Middle 2.0924 C05 2.7231 C06

B195 T1‐Story1 B30/50 End‐J 1.1168 C12 3.1758 C05

B116 T1‐Story1 B25/50 End‐I 0.4843 C11 1.0679 C06

B116 T1‐Story1 B25/50 Middle 0.44 C11 1.3606 C06

B116 T1‐Story1 B25/50 End‐J 0.55 C11 1.2919 C06

B129 T1‐Story1 B25/50 End‐I 1.1726 C02 0.5863 C02

B129 T1‐Story1 B25/50 Middle 1.1741 C02 3.2142 C02

B129 T1‐Story1 B25/50 End‐J 1.5292 C02 0.7646 C02

B130 T1‐Story1 B25/50 End‐I 1.1435 C02 0.5718 C02

B130 T1‐Story1 B25/50 Middle 1.1652 C02 3.0366 C02

B130 T1‐Story1 B25/50 End‐J 1.8147 C02 0.9074 C02

B131 T1‐Story1 B25/45 End‐I 0.5144 C02 2.0308 C02B131 T1‐Story1 B25/45 Middle 0.5144 C02 2.9958 C02

B131 T1‐Story1 B25/45 End‐J 2.0575 C02 1.0288 C02

B132 T1‐Story1 B25/45 End‐I 0.0872 C17 2.4514 C02

B132 T1‐Story1 B25/45 Middle 0.0448 C08 3.5634 C02

B132 T1‐Story1 B25/45 End‐J 0.1157 C08 2.2793 C02

B133 T1‐Story1 B25/45 End‐I 0.4971 C02 2.0709 C02

B133 T1‐Story1 B25/45 Middle 0.4971 C02 3.0504 C02

B133 T1‐Story1 B25/45 End‐J 1.9885 C02 0.9943 C02

B134 T1‐Story1 B25/45 End‐I 0.1137 C17 2.3487 C02

Page 37: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 37/104

B134 T1‐Story1 B25/45 Middle 0.0455 C02 3.4807 C02

B134 T1‐Story1 B25/45 End‐J 0.1821 C02 2.1396 C02

B135 T1‐Story1 B25/45 End‐I 0.1173 C18 2.3169 C02

B135 T1‐Story1 B25/45 Middle 0.0509 C02 3.4385 C02

B135 T1‐Story1 B25/45 End‐J 0.2037 C02 2.1027 C02

B151 T1‐Story1 B30/50 End‐I 3.4254 C10 4.1668 C02

B151 T1‐Story1 B30/50 Middle 0.8634 C07 4.676 C02

B151 T1‐Story1 B30/50 End‐J 3.4537 C07 4.1928 C02

B196 T1‐Story1 B25/45 End‐I 0.8947 C13 1.3468 C04B196 T1‐Story1 B25/45 Middle 1.4356 C04 1.5246 C04

B196 T1‐Story1 B25/45 End‐J 2.7029 C02 1.3514 C02

B197 T1‐Story1 B25/45 End‐I 2.6913 C02 1.3457 C02

B197 T1‐Story1 B25/45 Middle 1.349 C02 1.5637 C06

B197 T1‐Story1 B25/45 End‐J 0.8943 C11 1.3659 C06

B198 T1‐Story1 B30/50 End‐I 2.5722 C09 4.3008 C02

B198 T1‐Story1 B30/50 Middle 0.8655 C08 4.8074 C02

B198 T1‐Story1 B30/50 End‐J 3.462 C08 4.1788 C02

B200 T1‐Story1 B20/35 End‐I 0.1329 C02 0.5351 C02

B200 T1‐Story1 B20/35 Middle 0.1329 C02 1.8919 C02

B200 T1‐Story1 B20/35 End‐J 0.1329 C02 0.5855 C02

B201 T1‐Story1 B20/35 End‐I 0.1551 C02 0.5923 C02

B201 T1‐Story1 B20/35 Middle 0.1551 C02 1.9776 C02

B201 T1‐Story1 B20/35 End‐J 0.1551 C02 0.6511 C02

B252 T1‐Story1 B20/35 End‐I 1.0307 C02 0.5153 C02

B252 T1‐Story1 B20/35 Middle 0.94 C02 0.2577 C02

B252 T1‐Story1 B20/35 End‐J 0.91 C02 0.455 C02

B253 T1‐Story1 B20/35 End‐I 1.3445 C02 0.6723 C02

B253 T1‐Story1 B20/35 Middle 1.2474 C02 0.3361 C02

B253 T1‐Story1 B20/35 End‐J 1.2044 C02 0.6022 C02

B109 T1‐Story1 B20/35 End‐I 1.66 C14 1.8028 C12

B109 T1‐Story1 B20/35 Middle 0.8174 C14 1.0328 C03

B109 T1‐Story1 B20/35 End‐J 1.7113 C12 0.9795 C04B202 T1‐Story1 B20/40 End‐I 1.6654 C10 0.8327 C10

B202 T1‐Story1 B20/40 Middle 0.9368 C10 0.4164 C10

B202 T1‐Story1 B20/40 End‐J 0.4164 C10 0.4164 C10

B254 T1‐Story1 B20/40 End‐I 2.3351 C14 1.3373 C05

B254 T1‐Story1 B20/40 Middle 1.1943 C12 1.4568 C05

B254 T1‐Story1 B20/40 End‐J 2.3419 C12 2.5867 C14

B255 T1‐Story1 B20/40 End‐I 1.6654 C10 0.8327 C10

B255 T1‐Story1 B20/40 Middle 0.9368 C10 0.4164 C10

B255 T1‐Story1 B20/40 End‐J 0.4164 C10 0.4164 C10

B1 T1‐Story1 B30/45 End‐I 0 C18 2.9349 C02

B18 T1‐Story1 B30/45 End‐J 0 C18 2.9522 C02

B23 T1‐Story1 B30/45 End‐I 0 C18 0.9394 C02B26 T1‐Story1 B30/45 End‐I 0 C18 0.8394 C02

B29 T1‐Story1 B30/45 End‐I 0 C18 0.8465 C02

B30 T1‐Story1 B30/45 End‐J 0 C18 1.0721 C02

B31 T1‐Story1 B30/45 End‐J 0 C18 0.4986 C02

B33 T1‐Story1 B30/45 End‐I 0 C18 2.4336 C02

B34 T1‐Story1 B30/45 End‐J 0 C18 2.3919 C02

B35 T1‐Story1 B30/45 End‐I 0 C18 3.8971 C02

B36 T1‐Story1 B30/45 End‐I 0 C18 2.7556 C02

B36 T1‐Story1 B30/45 End‐J 0 C18 4.0613 C02

Page 38: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 38/104

B37 T1‐Story1 B30/45 End‐J 0 C18 2.2985 C02

B38 T1‐Story1 B30/45 End‐I 0 C18 1.8862 C02

B39 T1‐Story1 B30/45 End‐I 0 C18 2.4918 C02

B39 T1‐Story1 B30/45 End‐J 0 C18 2.1994 C02

B40 T1‐Story1 B30/45 End‐J 0 C18 2.2125 C02

B41 T1‐Story1 B30/45 End‐I 0 C18 2.363 C02

B42 T1‐Story1 B30/45 End‐I 0 C18 2.5759 C02

B42 T1‐Story1 B30/45 End‐J 0 C18 2.6438 C02

B43 T1‐Story1 B30/45 End‐J 0 C18 2.2635 C02B44 T1‐Story1 B30/45 End‐I 0 C18 2.2979 C02

B45 T1‐Story1 B30/45 End‐I 0 C18 2.5824 C02

B45 T1‐Story1 B30/45 End‐J 0 C18 2.5934 C02

B46 T1‐Story1 B30/45 End‐J 0 C18 2.284 C02

B48 T1‐Story1 B30/45 End‐I 0 C18 2.2564 C02

B48 T1‐Story1 B30/45 End‐J 0 C18 2.5695 C02

B49 T1‐Story1 B30/45 End‐J 0 C18 1.9528 C02

B50 T1‐Story1 B30/45 End‐I 0 C18 2.4027 C02

B51 T1‐Story1 B30/45 End‐I 0 C18 5.4334 C02

B51 T1‐Story1 B30/45 End‐J 0 C18 2.8625 C02

B52 T1‐Story1 B30/45 End‐J 0 C18 5.2278 C02

B67 T1‐Story1 B30/45 End‐I 0 C18 2.8519 C02

B68 T1‐Story1 B30/45 End‐J 0 C18 2.8974 C02

B73 T1‐Story1 B30/45 End‐I 0 C18 0.9402 C02

B76 T1‐Story1 B30/45 End‐I 0 C18 0.8367 C02

B79 T1‐Story1 B30/45 End‐I 0 C18 0.8327 C02

B80 T1‐Story1 B30/45 End‐J 0 C18 1.0239 C02

B81 T1‐Story1 B30/45 End‐J 0 C18 0.4916 C02

B83 T1‐Story1 B30/45 End‐I 0 C18 2.4416 C02

B84 T1‐Story1 B30/45 End‐J 0 C18 2.3876 C02

B85 T1‐Story1 B30/45 End‐I 0 C18 4.1098 C02

B86 T1‐Story1 B30/45 End‐I 0 C18 2.7312 C02

B86 T1‐Story1 B30/45 End‐J 0 C18 4.2692 C02B87 T1‐Story1 B30/45 End‐J 0 C18 2.2599 C02

B88 T1‐Story1 B30/45 End‐I 0 C18 1.869 C02

B89 T1‐Story1 B30/45 End‐I 0 C18 2.4731 C02

B89 T1‐Story1 B30/45 End‐J 0 C18 2.1871 C02

B90 T1‐Story1 B30/45 End‐J 0 C18 2.1985 C02

B91 T1‐Story1 B30/45 End‐I 0 C18 2.3968 C02

B92 T1‐Story1 B30/45 End‐I 0 C18 2.57 C02

B92 T1‐Story1 B30/45 End‐J 0 C18 2.6757 C02

B93 T1‐Story1 B30/45 End‐J 0 C18 2.253 C02

B94 T1‐Story1 B30/45 End‐I 0 C18 2.3201 C02

B95 T1‐Story1 B30/45 End‐I 0 C18 2.6565 C02

B95 T1‐Story1 B30/45 End‐J 0 C18 2.9441 C02B96 T1‐Story1 B30/45 End‐J 0 C18 2.3793 C02

B98 T1‐Story1 B30/45 End‐I 0 C18 2.2687 C02

B98 T1‐Story1 B30/45 End‐J 0 C18 2.4993 C02

B99 T1‐Story1 B30/45 End‐J 0 C18 2.0215 C02

B101 T1‐Story1 B30/45 End‐I 0 C18 5.3707 C02

B101 T1‐Story1 B30/45 End‐J 0 C18 2.8283 C02

B102 T1‐Story1 B30/45 End‐J 0 C18 5.2109 C02

B100 T1‐Story1 B30/45 End‐I 0.0084 C16 2.3277 C02

B78 T1‐Story1 B30/45 End‐J 0.0099 C17 0.8354 C02

Page 39: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 39/104

B28 T1‐Story1 B30/45 End‐J 0.0191 C18 0.7958 C02

B80 T1‐Story1 B30/45 End‐I 0.0283 C14 0.7768 C02

B30 T1‐Story1 B30/45 End‐I 0.031 C12 0.7593 C02

B22 T1‐Story1 B30/45 End‐J 0.0325 C14 0.6873 C02

B72 T1‐Story1 B30/45 End‐J 0.0349 C12 0.6713 C02

B52 T1‐Story1 B30/45 End‐I 0.0437 C15 0.2929 C02

B84 T1‐Story1 B30/45 End‐I 0.0471 C13 0.1116 C04

B34 T1‐Story1 B30/45 End‐I 0.0495 C11 0.1087 C06

B102 T1‐Story1 B30/45 End‐I 0.0554 C16 0.2713 C02B25 T1‐Story1 B30/45 End‐J 0.0596 C14 0.7955 C02

B75 T1‐Story1 B30/45 End‐J 0.0597 C12 0.7821 C02

B19 T1‐Story1 B30/45 End‐J 0.0633 C14 0.6071 C02

B69 T1‐Story1 B30/45 End‐J 0.0659 C12 0.5907 C02

B1 T1‐Story1 B30/45 End‐J 0.067 C16 2.0229 C02

B47 T1‐Story1 B30/45 End‐I 0.087 C15 2.2877 C02

B83 T1‐Story1 B30/45 End‐J 0.1044 C17 1.4973 C02

B33 T1‐Story1 B30/45 End‐J 0.1123 C18 1.4751 C02

B77 T1‐Story1 B30/45 End‐J 0.1261 C16 1.2402 C02

B97 T1‐Story1 B30/45 End‐I 0.147 C16 2.164 C02

B67 T1‐Story1 B30/45 End‐J 0.1504 C15 1.8607 C02

B82 T1‐Story1 B30/45 End‐I 0.1698 C17 0.9876 C02

B27 T1‐Story1 B30/45 End‐J 0.17 C15 1.1068 C02

B32 T1‐Story1 B30/45 End‐I 0.1774 C18 0.9468 C02

B54 T1‐Story1 B30/45 End‐I 0.2218 C16 1.9968 C02

B80 T1‐Story1 B30/45 Middle 0.256 C02 0.9549 C02

B61 T1‐Story1 B30/45 End‐J 0.2561 C15 1.9077 C02

B30 T1‐Story1 B30/45 Middle 0.268 C02 0.9703 C02

B27 T1‐Story1 B30/45 Middle 0.2767 C02 1.1187 C02

B77 T1‐Story1 B30/45 End‐I 0.2818 C17 1.1247 C02

B71 T1‐Story1 B30/45 Middle 0.2855 C08 0.7124 C02

B21 T1‐Story1 B30/45 Middle 0.2907 C07 0.7122 C02

B27 T1‐Story1 B30/45 End‐I 0.2967 C18 1.0214 C02B20 T1‐Story1 B30/45 End‐I 0.3069 C11 0.3558 C06

B77 T1‐Story1 B30/45 Middle 0.31 C02 1.237 C02

B74 T1‐Story1 B30/45 Middle 0.3282 C08 1.163 C02

B24 T1‐Story1 B30/45 Middle 0.3298 C07 1.1653 C02

B68 T1‐Story1 B30/45 End‐I 0.3549 C12 1.1085 C05

B18 T1‐Story1 B30/45 End‐I 0.3576 C14 1.1357 C03

B74 T1‐Story1 B30/45 End‐J 0.3774 C16 1.2512 C09

B24 T1‐Story1 B30/45 End‐J 0.3788 C15 1.2534 C10

B65 T1‐Story1 B30/45 Middle 0.3844 C14 0.7626 C03

B58 T1‐Story1 B30/45 Middle 0.4156 C11 0.7437 C06

B29 T1‐Story1 B30/45 Middle 0.4463 C06 0.3497 C02

B79 T1‐Story1 B30/45 Middle 0.465 C04 0.3651 C02B26 T1‐Story1 B30/45 Middle 0.5139 C08 0.3998 C02

B76 T1‐Story1 B30/45 Middle 0.5245 C07 0.4061 C02

B71 T1‐Story1 B30/45 End‐I 0.565 C17 1.1421 C08

B21 T1‐Story1 B30/45 End‐I 0.5668 C18 1.163 C07

B84 T1‐Story1 B30/45 Middle 0.5969 C02 1.3002 C02

B34 T1‐Story1 B30/45 Middle 0.598 C02 1.2993 C02

B74 T1‐Story1 B30/45 End‐I 0.5996 C17 1.3127 C08

B24 T1‐Story1 B30/45 End‐I 0.603 C18 1.3193 C07

B33 T1‐Story1 B30/45 Middle 0.6084 C02 2.0089 C02

Page 40: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 40/104

B83 T1‐Story1 B30/45 Middle 0.6104 C02 2.024 C02

B89 T1‐Story1 B30/45 Middle 0.6183 C02 2.4797 C02

B66 T1‐Story1 B30/45 Middle 0.622 C18 0.976 C07

B39 T1‐Story1 B30/45 Middle 0.6229 C02 2.4952 C02

B98 T1‐Story1 B30/45 Middle 0.6248 C02 2.5337 C02

B59 T1‐Story1 B30/45 Middle 0.6304 C17 0.9379 C08

B48 T1‐Story1 B30/45 Middle 0.6424 C02 2.5626 C02

B45 T1‐Story1 B30/45 Middle 0.6484 C02 2.7375 C02

B42 T1‐Story1 B30/45 Middle 0.6609 C02 2.7595 C02B92 T1‐Story1 B30/45 Middle 0.6689 C02 2.7725 C02

B71 T1‐Story1 B30/45 End‐J 0.6749 C16 0.9821 C09

B21 T1‐Story1 B30/45 End‐J 0.6911 C15 0.9777 C10

B67 T1‐Story1 B30/45 Middle 0.713 C02 2.4109 C02

B68 T1‐Story1 B30/45 Middle 0.7244 C02 2.0264 C02

B1 T1‐Story1 B30/45 Middle 0.7337 C02 2.5335 C02

B95 T1‐Story1 B30/45 Middle 0.736 C02 2.95 C02

B18 T1‐Story1 B30/45 Middle 0.7381 C02 2.0682 C02

B70 T1‐Story1 B30/45 End‐I 0.7772 C05 0.3886 C05

B73 T1‐Story1 B30/45 Middle 0.7829 C08 0.6224 C17

B23 T1‐Story1 B30/45 Middle 0.7841 C07 0.6254 C18

B64 T1‐Story1 B30/45 Middle 0.7877 C13 1.1677 C04

B59 T1‐Story1 B30/45 End‐I 0.8172 C16 0.7193 C09

B81 T1‐Story1 B30/45 Middle 0.8174 C02 0.55 C02

B57 T1‐Story1 B30/45 Middle 0.8189 C11 1.1549 C06

B31 T1‐Story1 B30/45 Middle 0.8359 C02 0.561 C02

B66 T1‐Story1 B30/45 End‐J 0.8447 C15 0.6974 C10

B62 T1‐Story1 B30/45 Middle 0.8608 C17 1.1511 C08

B22 T1‐Story1 B30/45 Middle 0.8722 C10 0.5674 C15

B72 T1‐Story1 B30/45 Middle 0.8797 C09 0.5427 C16

B256 T1‐Story1 B30/45 Middle 0.8829 C02 6.8679 C02

B78 T1‐Story1 B30/45 Middle 0.8977 C09 0.5391 C16

B28 T1‐Story1 B30/45 Middle 0.8992 C10 0.5179 C15B55 T1‐Story1 B30/45 Middle 0.9536 C15 1.3728 C10

B82 T1‐Story1 B30/45 Middle 0.9665 C09 0.5601 C02

B35 T1‐Story1 B30/45 Middle 0.9743 C02 0.9743 C02

B32 T1‐Story1 B30/45 Middle 0.9875 C10 0.5754 C02

B17 T1‐Story1 B30/45 Middle 0.9946 C02 4.4325 C02

B12 T1‐Story1 B30/45 Middle 1.0121 C02 4.4229 C02

B36 T1‐Story1 B30/45 Middle 1.0153 C02 3.5581 C02

B85 T1‐Story1 B30/45 Middle 1.0274 C02 1.0322 C02

B14 T1‐Story1 B30/45 Middle 1.0366 C02 5.8154 C02

B15 T1‐Story1 B30/45 Middle 1.0547 C02 5.8293 C02

B86 T1‐Story1 B30/45 Middle 1.0673 C02 3.6499 C02

B16 T1‐Story1 B30/45 Middle 1.0838 C02 5.7247 C02B91 T1‐Story1 B30/45 Middle 1.0916 C02 1.0916 C02

B41 T1‐Story1 B30/45 Middle 1.1047 C02 1.1047 C02

B25 T1‐Story1 B30/45 Middle 1.1275 C10 0.718 C15

B75 T1‐Story1 B30/45 Middle 1.1288 C09 0.7056 C16

B58 T1‐Story1 B30/45 End‐I 1.1415 C06 0.8957 C11

B65 T1‐Story1 B30/45 End‐J 1.1649 C04 0.8454 C13

B90 T1‐Story1 B30/45 Middle 1.2047 C04 1.0919 C02

B40 T1‐Story1 B30/45 Middle 1.2053 C06 1.0814 C02

B56 T1‐Story1 B30/45 Middle 1.213 C15 1.5704 C10

Page 41: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 41/104

B13 T1‐Story1 B30/45 Middle 1.2243 C02 5.7168 C02

B47 T1‐Story1 B30/45 Middle 1.258 C07 1.0726 C02

B94 T1‐Story1 B30/45 Middle 1.2603 C08 1.1275 C02

B63 T1‐Story1 B30/45 Middle 1.2641 C16 1.5297 C09

B44 T1‐Story1 B30/45 Middle 1.2839 C07 1.1348 C02

B102 T1‐Story1 B30/45 Middle 1.3027 C02 2.8908 C02

B52 T1‐Story1 B30/45 Middle 1.3069 C02 2.91 C02

B256 T1‐Story1 B30/45 End‐J 1.3194 C03 1.4547 C06

B65 T1‐Story1 B30/45 End‐I 1.339 C05 0.8462 C12B257 T1‐Story1 B30/45 Middle 1.3393 C13 6.8032 C02

B101 T1‐Story1 B30/45 Middle 1.3427 C02 4.2491 C02

B43 T1‐Story1 B30/45 Middle 1.3553 C10 1.1576 C02

B51 T1‐Story1 B30/45 Middle 1.3584 C02 4.2976 C02

B93 T1‐Story1 B30/45 Middle 1.3612 C09 1.1738 C02

B97 T1‐Story1 B30/45 Middle 1.3622 C08 1.1174 C02

B19 T1‐Story1 B30/45 Middle 1.3749 C02 0.8576 C02

B69 T1‐Story1 B30/45 Middle 1.3851 C02 0.8587 C02

B29 T1‐Story1 B30/45 End‐J 1.3987 C02 0.6994 C02

B58 T1‐Story1 B30/45 End‐J 1.422 C03 0.8379 C14

B46 T1‐Story1 B30/45 Middle 1.4524 C10 1.1422 C02

B79 T1‐Story1 B30/45 End‐J 1.4606 C02 0.7303 C02

B96 T1‐Story1 B30/45 Middle 1.4622 C09 1.1736 C02

B38 T1‐Story1 B30/45 Middle 1.5073 C02 1.2843 C02

B88 T1‐Story1 B30/45 Middle 1.535 C02 1.2938 C02

B37 T1‐Story1 B30/45 Middle 1.5953 C02 1.4313 C02

B26 T1‐Story1 B30/45 End‐J 1.5993 C02 0.7997 C02

B20 T1‐Story1 B30/45 Middle 1.6069 C07 0.77 C07

B76 T1‐Story1 B30/45 End‐J 1.6243 C02 0.8122 C02

B66 T1‐Story1 B30/45 End‐I 1.6275 C10 1.045 C15

B59 T1‐Story1 B30/45 End‐J 1.6599 C09 0.999 C16

B8 T1‐Story1 B30/45 Middle 1.6845 C02 7.6522 C02

B10 T1‐Story1 B30/45 Middle 1.694 C02 7.6755 C02B9 T1‐Story1 B30/45 Middle 1.7171 C02 7.9163 C02

B99 T1‐Story1 B30/45 Middle 1.729 C09 1.2507 C02

B87 T1‐Story1 B30/45 Middle 1.743 C02 1.4955 C02

B11 T1‐Story1 B30/45 Middle 1.754 C02 8.0491 C02

B7 T1‐Story1 B30/45 Middle 1.7622 C02 8.0343 C02

B49 T1‐Story1 B30/45 Middle 1.7801 C10 1.2971 C02

B57 T1‐Story1 B30/45 End‐I 1.8019 C06 1.4613 C11

B64 T1‐Story1 B30/45 End‐J 1.8221 C04 1.4096 C13

B4 T1‐Story1 B30/45 Middle 1.8772 C02 8.0117 C02

B17 T1‐Story1 B30/45 End‐I 1.9672 C10 2.8702 C02

B12 T1‐Story1 B30/45 End‐I 1.9927 C09 2.8658 C02

B28 T1‐Story1 B30/45 End‐I 2.0182 C10 1.0091 C10B22 T1‐Story1 B30/45 End‐I 2.0252 C10 1.0126 C10

B78 T1‐Story1 B30/45 End‐I 2.033 C09 1.0165 C09

B72 T1‐Story1 B30/45 End‐I 2.0366 C09 1.0183 C09

B73 T1‐Story1 B30/45 End‐J 2.0389 C08 1.0194 C08

B6 T1‐Story1 B30/45 Middle 2.0401 C02 8.2034 C02

B23 T1‐Story1 B30/45 End‐J 2.0407 C07 1.0204 C07

B50 T1‐Story1 B30/45 Middle 2.0435 C02 1.6815 C02

B64 T1‐Story1 B30/45 End‐I 2.0601 C05 1.6008 C12

B2 T1‐Story1 B30/45 Middle 2.0696 C02 8.2013 C02

Page 42: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 42/104

B100 T1‐Story1 B30/45 Middle 2.0997 C02 1.6908 C02

B57 T1‐Story1 B30/45 End‐J 2.1397 C03 1.5978 C14

B81 T1‐Story1 B30/45 End‐I 2.2 C02 1.1 C02

B82 T1‐Story1 B30/45 End‐J 2.2405 C02 1.1202 C02

B31 T1‐Story1 B30/45 End‐I 2.244 C02 1.122 C02

B5 T1‐Story1 B30/45 Middle 2.2638 C02 11.7902 C02

B3 T1‐Story1 B30/45 Middle 2.2698 C02 11.8168 C02

B32 T1‐Story1 B30/45 End‐J 2.3015 C02 1.1507 C02

B55 T1‐Story1 B30/45 End‐J 2.3373 C07 2.0347 C18B85 T1‐Story1 B30/45 End‐J 2.3446 C02 1.1723 C02

B62 T1‐Story1 B30/45 End‐J 2.3696 C09 1.8142 C16

B13 T1‐Story1 B30/45 End‐I 2.3833 C09 3.613 C02

B16 T1‐Story1 B30/45 End‐I 2.4309 C10 3.6022 C02

B55 T1‐Story1 B30/45 End‐I 2.4332 C10 1.7073 C15

B75 T1‐Story1 B30/45 End‐I 2.4539 C09 1.227 C09

B25 T1‐Story1 B30/45 End‐I 2.454 C10 1.227 C10

B63 T1‐Story1 B30/45 End‐J 2.4923 C09 2.1678 C16

B62 T1‐Story1 B30/45 End‐I 2.4949 C08 2.0116 C17

B15 T1‐Story1 B30/45 End‐I 2.555 C10 3.6539 C02

B56 T1‐Story1 B30/45 End‐I 2.5742 C10 2.0717 C15

B14 T1‐Story1 B30/45 End‐I 2.5937 C09 3.6262 C02

B257 T1‐Story1 B30/45 End‐I 2.7519 C05 1.4038 C12

B56 T1‐Story1 B30/45 End‐J 2.848 C07 2.3886 C18

B35 T1‐Story1 B30/45 End‐J 2.8588 C02 1.4294 C02

B63 T1‐Story1 B30/45 End‐I 2.9908 C08 2.3495 C17

B20 T1‐Story1 B30/45 End‐J 3.08 C07 1.54 C07

B61 T1‐Story1 B30/45 Middle 3.2156 C02 1.4717 C02

B54 T1‐Story1 B30/45 Middle 3.2802 C02 1.5071 C02

B70 T1‐Story1 B30/45 Middle 3.3353 C02 1.4954 C02

B257 T1‐Story1 B30/45 End‐J 3.4034 C02 1.7017 C02

B19 T1‐Story1 B30/45 End‐I 3.4305 C02 1.7152 C02

B69 T1‐Story1 B30/45 End‐I 3.4346 C02 1.7173 C02B256 T1‐Story1 B30/45 End‐I 3.5315 C02 1.7657 C02

B17 T1‐Story1 B30/45 End‐J 3.9785 C02 2.0011 C02

B12 T1‐Story1 B30/45 End‐J 4.0486 C02 2.0243 C02

B14 T1‐Story1 B30/45 End‐J 4.1462 C02 3.1342 C02

B15 T1‐Story1 B30/45 End‐J 4.2188 C02 3.1219 C02

B47 T1‐Story1 B30/45 End‐J 4.2905 C02 2.1452 C02

B49 T1‐Story1 B30/45 End‐I 4.2987 C10 2.5941 C02

B40 T1‐Story1 B30/45 End‐I 4.3256 C02 2.1628 C02

B16 T1‐Story1 B30/45 End‐J 4.3353 C02 2.8983 C02

B91 T1‐Story1 B30/45 End‐J 4.3664 C02 2.1832 C02

B90 T1‐Story1 B30/45 End‐I 4.3677 C02 2.1838 C02

B41 T1‐Story1 B30/45 End‐J 4.4186 C02 2.2093 C02B97 T1‐Story1 B30/45 End‐J 4.4695 C02 2.2347 C02

B94 T1‐Story1 B30/45 End‐J 4.5101 C02 2.2551 C02

B44 T1‐Story1 B30/45 End‐J 4.5394 C02 2.2697 C02

B46 T1‐Story1 B30/45 End‐I 4.569 C02 2.2845 C02

B43 T1‐Story1 B30/45 End‐I 4.6305 C02 2.3153 C02

B96 T1‐Story1 B30/45 End‐I 4.6944 C02 2.3472 C02

B93 T1‐Story1 B30/45 End‐I 4.6953 C02 2.3477 C02

B13 T1‐Story1 B30/45 End‐J 4.8973 C02 2.7632 C02

B99 T1‐Story1 B30/45 End‐I 5.0029 C02 2.5014 C02

Page 43: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 43/104

B38 T1‐Story1 B30/45 End‐J 5.137 C02 2.5685 C02

B88 T1‐Story1 B30/45 End‐J 5.175 C02 2.5875 C02

B37 T1‐Story1 B30/45 End‐I 5.7252 C02 2.8626 C02

B61 T1‐Story1 B30/45 End‐I 5.8869 C02 2.9435 C02

B70 T1‐Story1 B30/45 End‐J 5.9815 C02 2.9908 C02

B87 T1‐Story1 B30/45 End‐I 5.9821 C02 2.9911 C02

B54 T1‐Story1 B30/45 End‐J 6.0283 C02 3.0142 C02

B7 T1‐Story1 B30/45 End‐I 6.2632 C02 4.5576 C02

B11 T1‐Story1 B30/45 End‐J 6.2835 C02 4.4386 C02B5 T1‐Story1 B30/45 End‐J 6.5854 C02 8.1143 C02

B8 T1‐Story1 B30/45 End‐I 6.6785 C02 4.1379 C02

B10 T1‐Story1 B30/45 End‐I 6.6825 C02 4.221 C02

B3 T1‐Story1 B30/45 End‐I 6.7116 C02 8.1297 C02

B9 T1‐Story1 B30/45 End‐I 6.7206 C02 4.2728 C02

B50 T1‐Story1 B30/45 End‐J 6.7259 C02 3.3629 C02

B8 T1‐Story1 B30/45 End‐J 6.738 C02 4.2022 C02

B100 T1‐Story1 B30/45 End‐J 6.7633 C02 3.3817 C02

B10 T1‐Story1 B30/45 End‐J 6.7761 C02 4.1472 C02

B9 T1‐Story1 B30/45 End‐J 6.8683 C02 4.2462 C02

B2 T1‐Story1 B30/45 End‐I 7.0058 C02 4.6017 C02

B11 T1‐Story1 B30/45 End‐I 7.0159 C02 4.2616 C02

B7 T1‐Story1 B30/45 End‐J 7.049 C02 4.2379 C02

B6 T1‐Story1 B30/45 End‐J 7.3149 C02 4.43 C02

B4 T1‐Story1 B30/45 End‐I 7.4786 C02 4.2387 C02

B4 T1‐Story1 B30/45 End‐J 7.5088 C02 4.2307 C02

B6 T1‐Story1 B30/45 End‐I 8.1606 C02 4.2537 C02

B2 T1‐Story1 B30/45 End‐J 8.2783 C02 4.2215 C02

B5 T1‐Story1 B30/45 End‐I 9.0554 C02 5.4413 C02

B3 T1‐Story1 B30/45 End‐J 9.079 C02 4.5395 C02

Page 44: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 44/104

Max of  (‐) 

Moment 

ax o  +  

Moment 

RINGKASAN MOMEN LENTUR EXTRIM 

B20/35   1.71 1.98   1.66 1.25 1.71

End‐I 1.66 1.80

End‐J 1.71 0.98 1.80 1.98 0.98

Middle 1.25 1.98

B20/40   2.34 2.59End‐I 2.34 1.34   2.34 1.26 2.34

End‐J 2.34 2.59

Middle 1.26 1.46 1.34 1.46 2.59

b25   5.58 2.79

End‐I 5.58 2.79   5.58 1.40 1.40

End‐J 1.40 1.40

Middle 4.71 1.40 2.79 4.71 1.40

B25/40   0.38 1.58

End‐I 0.38 1.41   0.38 0.38 0.38

End‐J 0.38 1.58

Middle 0.38 1.46 1.41 1.46 1.58

B25/45   2.70 3.56

End‐I 2.69 2.45   2.69 1.44 2.70

End‐J 2.70 2.28

Middle 1.44 3.56 2.45 3.56 2.28

B25 50   4.84 3.98

End‐I 4.84 3.59   4.84 3.98 4.42

End‐J 4.42 3.49

Middle 4.42 3.98 3.59 4.42 3.49

B30/45   9.08 11.82

End‐I 9.06 8.13   9.06 3.34 9.08

End‐J 9.08 8.11

. . . . .

B30/50   5.52 7.54

End‐I 4.63 6.06   4.63 2.21 5.52

End‐J 5.52 5.88

Middle 2.21 7.54 6.06 7.54 5.88

(blank)   0.00 0.00

(blank) 0.00 0.00

ran   ota . .

Page 45: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 45/104

TABLE:  Concrete Beam Shear Envelope

Label Story Section Location V V Combo

tonf 

B3 T1‐Story3 B30/50 End‐I 4.56 C10

B3 T1‐Story3 B30/50 Middle 1.69 C07

B3 T1‐Story3 B30/50 End‐J 2.50 C07

B4 T1‐Story3 B30/50 End‐I 0.73 C18

B4 T1‐Story3 B30/50 Middle 0.45 C18

B4 T1‐

Story3 B30/50 End‐

J 1.05 C18B5 T1‐Story3 B30/50 End‐I 2.41 C08

B5 T1‐Story3 B30/50 Middle 4.03 C07

B5 T1‐Story3 B30/50 End‐J 4.84 C07

B222 T1‐Story3 B25/45 End‐I 2.42 C18

B222 T1‐Story3 B25/45 Middle 2.52 C18

B222 T1‐Story3 B25/45 End‐J 2.63 C18

B224 T1‐Story3 B25/50 End‐I 3.10 C10

B224 T1‐Story3 B25/50 Middle 2.88 C18

B224 T1‐Story3 B25/50 End‐J 2.76 C18

B225 T1‐Story3 B25/45 End‐I 0.89 C18

B225 T1‐Story3 B25/45 Middle 1.00 C18

B225 T1‐Story3 B25/45 End

‐J 1.11 C18

B226 T1‐Story3 B25/50 End‐I 1.51 C18

B226 T1‐Story3 B25/50 Middle 1.39 C18

B226 T1‐Story3 B25/50 End‐J 1.27 C18

B227 T1‐Story3 B25/45 End‐I 1.76 C18

B227 T1‐Story3 B25/45 Middle 1.87 C18

B227 T1‐Story3 B25/45 End‐J 1.97 C18

B228 T1‐Story3 B25/50 End‐I 3.27 C10

B228 T1‐Story3 B25/50 Middle 3.11 C10

B228 T1‐Story3 B25/50 End‐J 2.86 C18

B229 T1‐Story3 B25/45 End‐I 1.75 C18

B229 T1‐

Story3 B25/45 Middle 1.86 C18B229 T1‐Story3 B25/45 End‐J 1.97 C18

B230 T1‐Story3 B25/50 End‐I 3.32 C10

B230 T1‐Story3 B25/50 Middle 3.16 C10

B230 T1‐Story3 B25/50 End‐J 2.91 C18

B231 T1‐Story3 B25/45 End‐I 1.72 C18

B231 T1‐Story3 B25/45 Middle 1.83 C18

B231 T1‐Story3 B25/45 End‐J 1.94 C18

B232 T1‐Story3 B25/50 End‐I 3.36 C10

B232 T1‐Story3 B25/50 Middle 3.20 C10

B232 T1‐Story3 B25/50 End‐J 2.95 C18

B233 T1‐Story3 B25/45 End‐I 0.88 C18

B233 T1‐Story3 B25/45 Middle 0.98 C18

B233 T1‐Story3 B25/45 End‐J 1.09 C18

B234 T1‐Story3 B25/50 End‐I 1.42 C18

B234 T1‐Story3 B25/50 Middle 1.29 C18

B234 T1‐Story3 B25/50 End‐J 1.17 C18

B235 T1‐Story3 B25/45 End‐I 2.21 C18

B235 T1‐Story3 B25/45 Middle 2.28 C18

B235 T1‐Story3 B25/45 End‐J 2.39 C18

B236 T1‐Story3 B25/50 End‐I 2.81 C18

B236 T1‐Story3 B25/50 Middle 2.68 C18

Page 46: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 46/104

B236 T1‐Story3 B25/50 End‐J 2.57 C18

B237 T1‐Story3 B25/40 End‐I 0.81 C10

B237 T1‐Story3 B25/40 Middle 0.73 C18

B237 T1‐Story3 B25/40 End‐J 0.68 C18

B238 T1‐Story3 B25/40 End‐I 0.09 C18

B238 T1‐Story3 B25/40 Middle 0.20 C18

B238 T1‐Story3 B25/40 End‐J 0.30 C18

B239 T1‐Story3 B25/40 End‐I 0.10 C18

B239 T1‐

Story3 B25/40 Middle 0.21 C18B239 T1‐Story3 B25/40 End‐J 0.32 C18

B240 T1‐Story3 B25/40 End‐I 0.11 C18

B240 T1‐Story3 B25/40 Middle 0.21 C18

B240 T1‐Story3 B25/40 End‐J 0.32 C18

B241 T1‐Story3 B25/40 End‐I 0.09 C18

B241 T1‐Story3 B25/40 Middle 0.19 C18

B241 T1‐Story3 B25/40 End‐J 0.31 C18

B242 T1‐Story3 B25/40 End‐I 0.53 C18

B242 T1‐Story3 B25/40 Middle 0.70 C18

B242 T1‐Story3 B25/40 End‐J 0.75 C10

B243 T1‐Story3 B25/40 End‐I 0.54 C16

B243 T1‐Story3 B25/40 Middle 0.71 C18

B243 T1‐Story3 B25/40 End‐J 0.68 C18

B244 T1‐Story3 B25/40 End‐I 0.11 C18

B244 T1‐Story3 B25/40 Middle 0.19 C18

B244 T1‐Story3 B25/40 End‐J 0.31 C18

B245 T1‐Story3 B25/40 End‐I 0.12 C18

B245 T1‐Story3 B25/40 Middle 0.20 C18

B245 T1‐Story3 B25/40 End‐J 0.33 C18

B246 T1‐Story3 B25/40 End‐I 0.12 C18

B246 T1‐Story3 B25/40 Middle 0.21 C18

B246 T1‐Story3 B25/40 End‐J 0.34 C18

B247 T1‐

Story3 B25/40 End‐

I 0.09 C18B247 T1‐Story3 B25/40 Middle 0.18 C18

B247 T1‐Story3 B25/40 End‐J 0.32 C18

B248 T1‐Story3 B25/40 End‐I 0.53 C18

B248 T1‐Story3 B25/40 Middle 0.59 C18

B248 T1‐Story3 B25/40 End‐J 0.68 C18

B117 T1‐Story3 B20/40 End‐I 4.18 C10

B117 T1‐Story3 B20/40 Middle 4.29 C10

B117 T1‐Story3 B20/40 End‐J 4.39 C10

B118 T1‐Story3 B20/40 End‐I 3.84 C10

B118 T1‐Story3 B20/40 Middle 3.73 C10

B118 T1‐Story3 B20/40 End‐J 3.63 C10

B119 T1‐Story3 B20/40 End

‐I 3.55 C10

B119 T1‐Story3 B20/40 Middle 3.66 C10

B119 T1‐Story3 B20/40 End‐J 3.76 C10

B120 T1‐Story3 B20/40 End‐I 3.15 C10

B120 T1‐Story3 B20/40 Middle 3.05 C10

B120 T1‐Story3 B20/40 End‐J 2.94 C10

B121 T1‐Story3 B20/40 End‐I 3.75 C10

B121 T1‐Story3 B20/40 Middle 3.86 C10

B121 T1‐Story3 B20/40 End‐J 3.96 C10

B122 T1‐Story3 B20/40 End‐I 3.20 C10

Page 47: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 47/104

B122 T1‐Story3 B20/40 Middle 3.10 C10

B122 T1‐Story3 B20/40 End‐J 2.99 C10

B123 T1‐Story3 B20/40 End‐I 3.80 C10

B123 T1‐Story3 B20/40 Middle 3.90 C10

B123 T1‐Story3 B20/40 End‐J 4.01 C10

B124 T1‐Story3 B20/40 End‐I 3.19 C10

B124 T1‐Story3 B20/40 Middle 3.09 C10

B124 T1‐Story3 B20/40 End‐J 2.99 C10

B125 T1‐

Story3 B20/40 End‐

I 3.70 C10B125 T1‐Story3 B20/40 Middle 3.81 C10

B125 T1‐Story3 B20/40 End‐J 3.91 C10

B126 T1‐Story3 B20/40 End‐I 3.09 C10

B126 T1‐Story3 B20/40 Middle 2.99 C10

B126 T1‐Story3 B20/40 End‐J 2.88 C10

B127 T1‐Story3 B20/40 End‐I 4.74 C10

B127 T1‐Story3 B20/40 Middle 4.84 C10

B127 T1‐Story3 B20/40 End‐J 4.95 C10

B128 T1‐Story3 B20/40 End‐I 4.20 C10

B128 T1‐Story3 B20/40 Middle 4.10 C10

B128 T1‐Story3 B20/40 End‐J 3.99 C10

B203 T1‐Story3 B20/35 End

‐I 0.22 C18

B203 T1‐Story3 B20/35 Middle 0.29 C18

B203 T1‐Story3 B20/35 End‐J 0.28 C18

B204 T1‐Story3 B20/35 End‐I 0.15 C18

B204 T1‐Story3 B20/35 Middle 0.23 C18

B204 T1‐Story3 B20/35 End‐J 0.24 C18

B205 T1‐Story3 B20/35 End‐I 0.08 C18

B205 T1‐Story3 B20/35 Middle 0.16 C18

B205 T1‐Story3 B20/35 End‐J 0.17 C18

B206 T1‐Story3 B20/35 End‐I 0.08 C18

B206 T1‐Story3 B20/35 Middle 0.16 C18

B206 T1‐

Story3 B20/35 End‐

J 0.17 C18B207 T1‐Story3 B20/35 End‐I 0.17 C18

B207 T1‐Story3 B20/35 Middle 0.25 C18

B207 T1‐Story3 B20/35 End‐J 0.25 C18

B208 T1‐Story3 B20/35 End‐I 0.26 C18

B208 T1‐Story3 B20/35 Middle 0.34 C18

B208 T1‐Story3 B20/35 End‐J 0.31 C18

B214 T1‐Story3 B20/35 End‐I 0.21 C18

B214 T1‐Story3 B20/35 Middle 0.28 C18

B214 T1‐Story3 B20/35 End‐J 0.28 C18

B221 T1‐Story3 B20/35 End‐I 0.12 C18

B221 T1‐Story3 B20/35 Middle 0.20 C18

B221 T1‐Story3 B20/35 End

‐J 0.22 C18

B223 T1‐Story3 B20/35 End‐I 0.05 C18

B223 T1‐Story3 B20/35 Middle 0.12 C18

B223 T1‐Story3 B20/35 End‐J 0.14 C18

B249 T1‐Story3 B20/35 End‐I 0.05 C18

B249 T1‐Story3 B20/35 Middle 0.12 C18

B249 T1‐Story3 B20/35 End‐J 0.14 C18

B250 T1‐Story3 B20/35 End‐I 0.12 C18

B250 T1‐Story3 B20/35 Middle 0.20 C18

B250 T1‐Story3 B20/35 End‐J 0.21 C18

Page 48: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 48/104

B251 T1‐Story3 B20/35 End‐I 0.24 C18

B251 T1‐Story3 B20/35 Middle 0.32 C18

B251 T1‐Story3 B20/35 End‐J 0.30 C18

B103 T1‐Story2 B30/50 End‐I 1.98 C18

B103 T1‐Story2 B30/50 Middle 1.71 C18

B103 T1‐Story2 B30/50 End‐J 2.32 C18

B104 T1‐Story2 B30/50 End‐I 1.06 C18

B104 T1‐Story2 B30/50 Middle 0.71 C18

B104 T1‐

Story2 B30/50 End‐

J 1.32 C18B105 T1‐Story2 B30/50 End‐I 0.93 C18

B105 T1‐Story2 B30/50 Middle 0.63 C18

B105 T1‐Story2 B30/50 End‐J 1.24 C18

B106 T1‐Story2 B30/50 End‐I 0.93 C18

B106 T1‐Story2 B30/50 Middle 0.63 C18

B106 T1‐Story2 B30/50 End‐J 1.23 C18

B107 T1‐Story2 B30/50 End‐I 1.05 C18

B107 T1‐Story2 B30/50 Middle 0.81 C18

B107 T1‐Story2 B30/50 End‐J 1.41 C18

B108 T1‐Story2 B30/50 End‐I 2.40 C18

B108 T1‐Story2 B30/50 Middle 2.05 C17

B108 T1‐Story2 B30/50 End

‐J 2.65 C17

B152 T1‐Story2 B30/50 End‐I 1.91 C18

B152 T1‐Story2 B30/50 Middle 1.63 C18

B152 T1‐Story2 B30/50 End‐J 2.23 C18

B153 T1‐Story2 B30/50 End‐I 1.01 C18

B153 T1‐Story2 B30/50 Middle 0.69 C18

B153 T1‐Story2 B30/50 End‐J 1.29 C18

B154 T1‐Story2 B30/50 End‐I 0.94 C18

B154 T1‐Story2 B30/50 Middle 0.65 C18

B154 T1‐Story2 B30/50 End‐J 1.25 C18

B155 T1‐Story2 B30/50 End‐I 0.93 C18

B155 T1‐

Story2 B30/50 Middle 0.64 C18B155 T1‐Story2 B30/50 End‐J 1.25 C18

B156 T1‐Story2 B30/50 End‐I 1.05 C18

B156 T1‐Story2 B30/50 Middle 0.82 C18

B156 T1‐Story2 B30/50 End‐J 1.43 C18

B157 T1‐Story2 B30/50 End‐I 2.34 C18

B157 T1‐Story2 B30/50 Middle 2.00 C18

B157 T1‐Story2 B30/50 End‐J 2.60 C18

B209 T1‐Story2 B30/50 End‐I 2.25 C18

B209 T1‐Story2 B30/50 Middle 2.04 C18

B209 T1‐Story2 B30/50 End‐J 2.44 C18

B210 T1‐Story2 B30/50 End‐I 1.04 C18

B210 T1‐Story2 B30/50 Middle 0.88 C18

B210 T1‐Story2 B30/50 End‐J 1.30 C18

B211 T1‐Story2 B30/50 End‐I 0.98 C18

B211 T1‐Story2 B30/50 Middle 0.82 C18

B211 T1‐Story2 B30/50 End‐J 1.22 C18

B212 T1‐Story2 B30/50 End‐I 1.05 C18

B212 T1‐Story2 B30/50 Middle 0.89 C18

B212 T1‐Story2 B30/50 End‐J 1.29 C18

B213 T1‐Story2 B30/50 End‐I 2.13 C18

B213 T1‐Story2 B30/50 Middle 2.10 C18

Page 49: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 49/104

B213 T1‐Story2 B30/50 End‐J 2.23 C18

B174 T1‐Story2 b25 End‐I 5.79 C10

B174 T1‐Story2 b25 Middle 5.54 C10

B174 T1‐Story2 b25 End‐J 5.16 C10

B175 T1‐Story2 b25 End‐I 4.81 C10

B175 T1‐Story2 b25 Middle 4.60 C10

B175 T1‐Story2 b25 End‐J 4.40 C10

B176 T1‐Story2 b25 End‐I 5.79 C10

B176 T1‐

Story2 b25 Middle 5.54 C10B176 T1‐Story2 b25 End‐J 5.18 C10

B177 T1‐Story2 b25 End‐I 5.80 C10

B177 T1‐Story2 b25 Middle 5.55 C10

B177 T1‐Story2 b25 End‐J 5.17 C10

B178 T1‐Story2 b25 End‐I 5.86 C10

B178 T1‐Story2 b25 Middle 5.61 C10

B178 T1‐Story2 b25 End‐J 5.25 C10

B179 T1‐Story2 b25 End‐I 4.82 C10

B179 T1‐Story2 b25 Middle 4.62 C10

B179 T1‐Story2 b25 End‐J 4.41 C10

B180 T1‐Story2 B20/35 End‐I 0.25 C18

B180 T1‐Story2 B20/35 Middle 0.33 C18

B180 T1‐Story2 B20/35 End‐J 0.33 C18

B181 T1‐Story2 B25/50 End‐I 5.43 C10

B181 T1‐Story2 B25/50 Middle 5.17 C10

B181 T1‐Story2 B25/50 End‐J 4.85 C10

B182 T1‐Story2 B20/35 End‐I 0.12 C18

B182 T1‐Story2 B20/35 Middle 0.19 C18

B182 T1‐Story2 B20/35 End‐J 0.21 C18

B183 T1‐Story2 B25/50 End‐I 5.46 C10

B183 T1‐Story2 B25/50 Middle 5.21 C10

B183 T1‐Story2 B25/50 End‐J 4.89 C10

B184 T1‐

Story2 B20/35 End‐

I 0.12 C18B184 T1‐Story2 B20/35 Middle 0.19 C18

B184 T1‐Story2 B20/35 End‐J 0.20 C18

B185 T1‐Story2 B25/50 End‐I 5.45 C10

B185 T1‐Story2 B25/50 Middle 5.20 C10

B185 T1‐Story2 B25/50 End‐J 4.89 C10

B186 T1‐Story2 B20/35 End‐I 0.12 C18

B186 T1‐Story2 B20/35 Middle 0.20 C18

B186 T1‐Story2 B20/35 End‐J 0.21 C18

B187 T1‐Story2 B25/50 End‐I 5.46 C10

B187 T1‐Story2 B25/50 Middle 5.20 C10

B187 T1‐Story2 B25/50 End‐J 4.89 C10

B188 T1‐Story2 B20/35 End

‐I 0.26 C18

B188 T1‐Story2 B20/35 Middle 0.33 C18

B188 T1‐Story2 B20/35 End‐J 0.34 C18

B189 T1‐Story2 B25/50 End‐I 5.41 C10

B189 T1‐Story2 B25/50 Middle 5.16 C10

B189 T1‐Story2 B25/50 End‐J 4.83 C10

B2 T1‐Story1 B30/45 End‐I 5.76 C18

B2 T1‐Story1 B30/45 Middle 4.62 C18

B2 T1‐Story1 B30/45 End‐J 5.89 C18

B3 T1‐Story1 B30/45 End‐I 4.84 C18

Page 50: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 50/104

B3 T1‐Story1 B30/45 Middle 5.56 C18

B3 T1‐Story1 B30/45 End‐J 6.73 C18

B4 T1‐Story1 B30/45 End‐I 5.65 C18

B4 T1‐Story1 B30/45 Middle 4.41 C18

B4 T1‐Story1 B30/45 End‐J 5.66 C18

B5 T1‐Story1 B30/45 End‐I 6.69 C18

B5 T1‐Story1 B30/45 Middle 5.52 C18

B5 T1‐Story1 B30/45 End‐J 4.77 C18

B6 T1‐

Story1 B30/45 End‐

I 5.89 C18B6 T1‐Story1 B30/45 Middle 4.62 C18

B6 T1‐Story1 B30/45 End‐J 5.83 C18

B7 T1‐Story1 B30/45 End‐I 5.19 C18

B7 T1‐Story1 B30/45 Middle 4.09 C18

B7 T1‐Story1 B30/45 End‐J 5.26 C18

B8 T1‐Story1 B30/45 End‐I 5.15 C18

B8 T1‐Story1 B30/45 Middle 3.98 C18

B8 T1‐Story1 B30/45 End‐J 5.18 C18

B9 T1‐Story1 B30/45 End‐I 5.24 C18

B9 T1‐Story1 B30/45 Middle 4.07 C18

B9 T1‐Story1 B30/45 End‐J 5.26 C18

B10 T1‐Story1 B30/45 End

‐I 5.19 C18

B10 T1‐Story1 B30/45 Middle 4.00 C18

B10 T1‐Story1 B30/45 End‐J 5.19 C18

B11 T1‐Story1 B30/45 End‐I 5.26 C18

B11 T1‐Story1 B30/45 Middle 4.08 C18

B11 T1‐Story1 B30/45 End‐J 5.18 C18

B12 T1‐Story1 B30/45 End‐I 4.37 C18

B12 T1‐Story1 B30/45 Middle 4.60 C18

B12 T1‐Story1 B30/45 End‐J 4.93 C18

B13 T1‐Story1 B30/45 End‐I 4.95 C18

B13 T1‐Story1 B30/45 Middle 5.28 C18

B13 T1‐

Story1 B30/45 End‐

J 5.61 C18B14 T1‐Story1 B30/45 End‐I 5.02 C18

B14 T1‐Story1 B30/45 Middle 5.18 C18

B14 T1‐Story1 B30/45 End‐J 5.51 C18

B15 T1‐Story1 B30/45 End‐I 5.07 C18

B15 T1‐Story1 B30/45 Middle 5.27 C18

B15 T1‐Story1 B30/45 End‐J 5.60 C18

B16 T1‐Story1 B30/45 End‐I 4.97 C18

B16 T1‐Story1 B30/45 Middle 5.18 C18

B16 T1‐Story1 B30/45 End‐J 5.51 C18

B17 T1‐Story1 B30/45 End‐I 4.32 C18

B17 T1‐Story1 B30/45 Middle 4.53 C18

B17 T1‐Story1 B30/45 End

‐J 4.86 C18

B1 T1‐Story1 B30/45 End‐I 6.02 C10

B1 T1‐Story1 B30/45 Middle 6.23 C10

B1 T1‐Story1 B30/45 End‐J 6.43 C10

B18 T1‐Story1 B30/45 End‐I 7.48 C10

B18 T1‐Story1 B30/45 Middle 7.27 C10

B18 T1‐Story1 B30/45 End‐J 7.07 C10

B19 T1‐Story1 B30/45 End‐I 11.91 C10

B19 T1‐Story1 B30/45 Middle 11.75 C10

B19 T1‐Story1 B30/45 End‐J 11.58 C10

Page 51: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 51/104

B20 T1‐Story1 B30/45 End‐I 9.52 C10

B20 T1‐Story1 B30/45 Middle 9.68 C10

B20 T1‐Story1 B30/45 End‐J 9.85 C10

B21 T1‐Story1 B30/45 End‐I 3.66 C18

B21 T1‐Story1 B30/45 Middle 3.80 C10

B21 T1‐Story1 B30/45 End‐J 4.00 C10

B22 T1‐Story1 B30/45 End‐I 7.79 C10

B22 T1‐Story1 B30/45 Middle 7.63 C10

B22 T1‐

Story1 B30/45 End‐

J 7.46 C10B23 T1‐Story1 B30/45 End‐I 8.18 C10

B23 T1‐Story1 B30/45 Middle 8.35 C10

B23 T1‐Story1 B30/45 End‐J 8.51 C10

B24 T1‐Story1 B30/45 End‐I 3.91 C10

B24 T1‐Story1 B30/45 Middle 3.71 C10

B24 T1‐Story1 B30/45 End‐J 3.73 C10

B25 T1‐Story1 B30/45 End‐I 9.33 C10

B25 T1‐Story1 B30/45 Middle 9.16 C10

B25 T1‐Story1 B30/45 End‐J 8.99 C10

B26 T1‐Story1 B30/45 End‐I 6.95 C10

B26 T1‐Story1 B30/45 Middle 7.12 C10

B26 T1‐Story1 B30/45 End

‐J 7.28 C10

B27 T1‐Story1 B30/45 End‐I 2.92 C18

B27 T1‐Story1 B30/45 Middle 2.77 C18

B27 T1‐Story1 B30/45 End‐J 2.85 C18

B28 T1‐Story1 B30/45 End‐I 8.27 C10

B28 T1‐Story1 B30/45 Middle 8.10 C10

B28 T1‐Story1 B30/45 End‐J 7.94 C10

B29 T1‐Story1 B30/45 End‐I 6.39 C10

B29 T1‐Story1 B30/45 Middle 6.56 C10

B29 T1‐Story1 B30/45 End‐J 6.73 C10

B30 T1‐Story1 B30/45 End‐I 2.39 C18

B30 T1‐

Story1 B30/45 Middle 2.24 C18B30 T1‐Story1 B30/45 End‐J 2.21 C18

B31 T1‐Story1 B30/45 End‐I 8.18 C10

B31 T1‐Story1 B30/45 Middle 8.01 C10

B31 T1‐Story1 B30/45 End‐J 7.85 C10

B32 T1‐Story1 B30/45 End‐I 9.33 C10

B32 T1‐Story1 B30/45 Middle 9.49 C10

B32 T1‐Story1 B30/45 End‐J 9.66 C10

B33 T1‐Story1 B30/45 End‐I 5.18 C10

B33 T1‐Story1 B30/45 Middle 5.38 C10

B33 T1‐Story1 B30/45 End‐J 5.59 C10

B34 T1‐Story1 B30/45 End‐I 5.99 C10

B34 T1‐Story1 B30/45 Middle 5.79 C10

B34 T1‐Story1 B30/45 End‐J 5.58 C10

B35 T1‐Story1 B30/45 End‐I 9.51 C10

B35 T1‐Story1 B30/45 Middle 9.85 C10

B35 T1‐Story1 B30/45 End‐J 10.19 C10

B36 T1‐Story1 B30/45 End‐I 5.46 C10

B36 T1‐Story1 B30/45 Middle 5.12 C10

B36 T1‐Story1 B30/45 End‐J 4.78 C10

B37 T1‐Story1 B30/45 End‐I 11.63 C10

B37 T1‐Story1 B30/45 Middle 11.33 C10

Page 52: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 52/104

B37 T1‐Story1 B30/45 End‐J 11.03 C10

B38 T1‐Story1 B30/45 End‐I 10.06 C10

B38 T1‐Story1 B30/45 Middle 10.36 C10

B38 T1‐Story1 B30/45 End‐J 10.66 C10

B39 T1‐Story1 B30/45 End‐I 3.13 C18

B39 T1‐Story1 B30/45 Middle 2.98 C18

B39 T1‐Story1 B30/45 End‐J 3.35 C10

B40 T1‐Story1 B30/45 End‐I 10.93 C10

B40 T1‐

Story1 B30/45 Middle 10.62 C10B40 T1‐Story1 B30/45 End‐J 10.32 C10

B41 T1‐Story1 B30/45 End‐I 10.60 C10

B41 T1‐Story1 B30/45 Middle 10.90 C10

B41 T1‐Story1 B30/45 End‐J 11.20 C10

B42 T1‐Story1 B30/45 End‐I 3.46 C10

B42 T1‐Story1 B30/45 Middle 3.11 C18

B42 T1‐Story1 B30/45 End‐J 3.42 C10

B43 T1‐Story1 B30/45 End‐I 11.12 C10

B43 T1‐Story1 B30/45 Middle 10.81 C10

B43 T1‐Story1 B30/45 End‐J 10.51 C10

B44 T1‐Story1 B30/45 End‐I 10.53 C10

B44 T1‐Story1 B30/45 Middle 10.84 C10

B44 T1‐Story1 B30/45 End‐J 11.14 C10

B45 T1‐Story1 B30/45 End‐I 3.39 C10

B45 T1‐Story1 B30/45 Middle 3.05 C18

B45 T1‐Story1 B30/45 End‐J 3.38 C10

B46 T1‐Story1 B30/45 End‐I 11.13 C10

B46 T1‐Story1 B30/45 Middle 10.83 C10

B46 T1‐Story1 B30/45 End‐J 10.53 C10

B47 T1‐Story1 B30/45 End‐I 10.44 C10

B47 T1‐Story1 B30/45 Middle 10.74 C10

B47 T1‐Story1 B30/45 End‐J 11.04 C10

B48 T1‐

Story1 B30/45 End‐

I 3.45 C10B48 T1‐Story1 B30/45 Middle 3.07 C18

B48 T1‐Story1 B30/45 End‐J 3.21 C18

B49 T1‐Story1 B30/45 End‐I 10.79 C10

B49 T1‐Story1 B30/45 Middle 10.49 C10

B49 T1‐Story1 B30/45 End‐J 10.19 C10

B50 T1‐Story1 B30/45 End‐I 12.52 C10

B50 T1‐Story1 B30/45 Middle 12.82 C10

B50 T1‐Story1 B30/45 End‐J 13.12 C10

B51 T1‐Story1 B30/45 End‐I 5.37 C10

B51 T1‐Story1 B30/45 Middle 5.71 C10

B51 T1‐Story1 B30/45 End‐J 6.05 C10

B52 T1‐Story1 B30/45 End

‐I 6.77 C10

B52 T1‐Story1 B30/45 Middle 6.43 C10

B52 T1‐Story1 B30/45 End‐J 6.09 C10

B54 T1‐Story1 B30/45 End‐I 13.25 C10

B54 T1‐Story1 B30/45 Middle 13.59 C10

B54 T1‐Story1 B30/45 End‐J 13.76 C10

B55 T1‐Story1 B30/45 End‐I 3.34 C10

B55 T1‐Story1 B30/45 Middle 2.78 C18

B55 T1‐Story1 B30/45 End‐J 3.04 C18

B56 T1‐Story1 B30/45 End‐I 3.55 C10

Page 53: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 53/104

B56 T1‐Story1 B30/45 Middle 3.10 C18

B56 T1‐Story1 B30/45 End‐J 3.54 C10

B57 T1‐Story1 B30/45 End‐I 2.44 C18

B57 T1‐Story1 B30/45 Middle 2.35 C18

B57 T1‐Story1 B30/45 End‐J 2.61 C18

B58 T1‐Story1 B30/45 End‐I 1.69 C18

B58 T1‐Story1 B30/45 Middle 1.63 C18

B58 T1‐Story1 B30/45 End‐J 1.90 C18

B59 T1‐

Story1 B30/45 End‐

I 1.70 C18B59 T1‐Story1 B30/45 Middle 1.69 C18

B59 T1‐Story1 B30/45 End‐J 1.95 C18

B61 T1‐Story1 B30/45 End‐I 13.35 C10

B61 T1‐Story1 B30/45 Middle 13.18 C10

B61 T1‐Story1 B30/45 End‐J 12.84 C10

B62 T1‐Story1 B30/45 End‐I 2.90 C18

B62 T1‐Story1 B30/45 Middle 2.78 C18

B62 T1‐Story1 B30/45 End‐J 3.05 C18

B63 T1‐Story1 B30/45 End‐I 3.71 C10

B63 T1‐Story1 B30/45 Middle 3.36 C10

B63 T1‐Story1 B30/45 End‐J 3.60 C10

B64 T1‐Story1 B30/45 End

‐I 2.39 C18

B64 T1‐Story1 B30/45 Middle 2.25 C18

B64 T1‐Story1 B30/45 End‐J 2.52 C18

B65 T1‐Story1 B30/45 End‐I 1.67 C18

B65 T1‐Story1 B30/45 Middle 1.50 C18

B65 T1‐Story1 B30/45 End‐J 1.77 C18

B66 T1‐Story1 B30/45 End‐I 1.78 C18

B66 T1‐Story1 B30/45 Middle 1.56 C18

B66 T1‐Story1 B30/45 End‐J 1.82 C18

B67 T1‐Story1 B30/45 End‐I 6.07 C10

B67 T1‐Story1 B30/45 Middle 6.27 C10

B67 T1‐

Story1 B30/45 End‐

J 6.48 C10B68 T1‐Story1 B30/45 End‐I 7.35 C10

B68 T1‐Story1 B30/45 Middle 7.15 C10

B68 T1‐Story1 B30/45 End‐J 6.94 C10

B69 T1‐Story1 B30/45 End‐I 11.88 C10

B69 T1‐Story1 B30/45 Middle 11.71 C10

B69 T1‐Story1 B30/45 End‐J 11.54 C10

B70 T1‐Story1 B30/45 End‐I 14.39 C10

B70 T1‐Story1 B30/45 Middle 14.55 C10

B70 T1‐Story1 B30/45 End‐J 14.72 C10

B71 T1‐Story1 B30/45 End‐I 3.60 C18

B71 T1‐Story1 B30/45 Middle 3.70 C10

B71 T1‐Story1 B30/45 End

‐J 3.91 C10

B72 T1‐Story1 B30/45 End‐I 7.81 C10

B72 T1‐Story1 B30/45 Middle 7.64 C10

B72 T1‐Story1 B30/45 End‐J 7.47 C10

B73 T1‐Story1 B30/45 End‐I 8.18 C10

B73 T1‐Story1 B30/45 Middle 8.35 C10

B73 T1‐Story1 B30/45 End‐J 8.51 C10

B74 T1‐Story1 B30/45 End‐I 3.90 C10

B74 T1‐Story1 B30/45 Middle 3.70 C10

B74 T1‐Story1 B30/45 End‐J 3.72 C10

Page 54: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 54/104

B75 T1‐Story1 B30/45 End‐I 9.30 C10

B75 T1‐Story1 B30/45 Middle 9.13 C10

B75 T1‐Story1 B30/45 End‐J 8.96 C10

B76 T1‐Story1 B30/45 End‐I 7.02 C10

B76 T1‐Story1 B30/45 Middle 7.18 C10

B76 T1‐Story1 B30/45 End‐J 7.35 C10

B77 T1‐Story1 B30/45 End‐I 3.16 C18

B77 T1‐Story1 B30/45 Middle 3.00 C18

B77 T1‐

Story1 B30/45 End‐

J 3.08 C18B78 T1‐Story1 B30/45 End‐I 8.42 C10

B78 T1‐Story1 B30/45 Middle 8.25 C10

B78 T1‐Story1 B30/45 End‐J 8.08 C10

B79 T1‐Story1 B30/45 End‐I 6.53 C10

B79 T1‐Story1 B30/45 Middle 6.70 C10

B79 T1‐Story1 B30/45 End‐J 6.87 C10

B80 T1‐Story1 B30/45 End‐I 2.27 C18

B80 T1‐Story1 B30/45 Middle 2.12 C18

B80 T1‐Story1 B30/45 End‐J 2.13 C18

B81 T1‐Story1 B30/45 End‐I 8.03 C10

B81 T1‐Story1 B30/45 Middle 7.86 C10

B81 T1‐Story1 B30/45 End

‐J 7.69 C10

B82 T1‐Story1 B30/45 End‐I 9.27 C10

B82 T1‐Story1 B30/45 Middle 9.43 C10

B82 T1‐Story1 B30/45 End‐J 9.60 C10

B83 T1‐Story1 B30/45 End‐I 5.17 C10

B83 T1‐Story1 B30/45 Middle 5.38 C10

B83 T1‐Story1 B30/45 End‐J 5.58 C10

B84 T1‐Story1 B30/45 End‐I 5.98 C10

B84 T1‐Story1 B30/45 Middle 5.77 C10

B84 T1‐Story1 B30/45 End‐J 5.57 C10

B85 T1‐Story1 B30/45 End‐I 9.07 C10

B85 T1‐

Story1 B30/45 Middle 9.41 C10B85 T1‐Story1 B30/45 End‐J 9.75 C10

B86 T1‐Story1 B30/45 End‐I 5.75 C10

B86 T1‐Story1 B30/45 Middle 5.41 C10

B86 T1‐Story1 B30/45 End‐J 5.07 C10

B87 T1‐Story1 B30/45 End‐I 11.91 C10

B87 T1‐Story1 B30/45 Middle 11.61 C10

B87 T1‐Story1 B30/45 End‐J 11.31 C10

B88 T1‐Story1 B30/45 End‐I 10.04 C10

B88 T1‐Story1 B30/45 Middle 10.35 C10

B88 T1‐Story1 B30/45 End‐J 10.65 C10

B89 T1‐Story1 B30/45 End‐I 3.11 C18

B89 T1‐Story1 B30/45 Middle 2.95 C18

B89 T1‐Story1 B30/45 End‐J 3.33 C10

B90 T1‐Story1 B30/45 End‐I 10.92 C10

B90 T1‐Story1 B30/45 Middle 10.62 C10

B90 T1‐Story1 B30/45 End‐J 10.31 C10

B91 T1‐Story1 B30/45 End‐I 10.64 C10

B91 T1‐Story1 B30/45 Middle 10.94 C10

B91 T1‐Story1 B30/45 End‐J 11.24 C10

B92 T1‐Story1 B30/45 End‐I 3.51 C10

B92 T1‐Story1 B30/45 Middle 3.16 C18

Page 55: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 55/104

B92 T1‐Story1 B30/45 End‐J 3.45 C10

B93 T1‐Story1 B30/45 End‐I 11.12 C10

B93 T1‐Story1 B30/45 Middle 10.82 C10

B93 T1‐Story1 B30/45 End‐J 10.52 C10

B94 T1‐Story1 B30/45 End‐I 10.56 C10

B94 T1‐Story1 B30/45 Middle 10.86 C10

B94 T1‐Story1 B30/45 End‐J 11.17 C10

B95 T1‐Story1 B30/45 End‐I 3.88 C10

B95 T1‐

Story1 B30/45 Middle 3.54 C10B95 T1‐Story1 B30/45 End‐J 3.70 C10

B96 T1‐Story1 B30/45 End‐I 11.33 C10

B96 T1‐Story1 B30/45 Middle 11.03 C10

B96 T1‐Story1 B30/45 End‐J 10.73 C10

B97 T1‐Story1 B30/45 End‐I 10.29 C10

B97 T1‐Story1 B30/45 Middle 10.60 C10

B97 T1‐Story1 B30/45 End‐J 10.90 C10

B98 T1‐Story1 B30/45 End‐I 3.34 C10

B98 T1‐Story1 B30/45 Middle 2.97 C18

B98 T1‐Story1 B30/45 End‐J 3.15 C18

B99 T1‐Story1 B30/45 End‐I 10.84 C10

B99 T1‐Story1 B30/45 Middle 10.54 C10

B99 T1‐Story1 B30/45 End‐J 10.24 C10

B100 T1‐Story1 B30/45 End‐I 12.44 C10

B100 T1‐Story1 B30/45 Middle 12.75 C10

B100 T1‐Story1 B30/45 End‐J 13.05 C10

B101 T1‐Story1 B30/45 End‐I 5.36 C10

B101 T1‐Story1 B30/45 Middle 5.70 C10

B101 T1‐Story1 B30/45 End‐J 6.04 C10

B102 T1‐Story1 B30/45 End‐I 6.79 C10

B102 T1‐Story1 B30/45 Middle 6.45 C10

B102 T1‐Story1 B30/45 End‐J 6.11 C10

B110 T1‐

Story1 B30/50 End‐

I 1.21 C18B110 T1‐Story1 B30/50 Middle 0.84 C18

B110 T1‐Story1 B30/50 End‐J 1.05 C18

B111 T1‐Story1 B30/50 End‐I 0.92 C18

B111 T1‐Story1 B30/50 Middle 0.76 C18

B111 T1‐Story1 B30/50 End‐J 1.06 C18

B112 T1‐Story1 B30/50 End‐I 0.97 C18

B112 T1‐Story1 B30/50 Middle 0.81 C18

B112 T1‐Story1 B30/50 End‐J 1.11 C18

B113 T1‐Story1 B30/50 End‐I 0.99 C18

B113 T1‐Story1 B30/50 Middle 0.83 C18

B113 T1‐Story1 B30/50 End‐J 1.14 C18

B114 T1‐Story1 B30/50 End

‐I 0.99 C18

B114 T1‐Story1 B30/50 Middle 0.82 C18

B114 T1‐Story1 B30/50 End‐J 1.11 C18

B115 T1‐Story1 B30/50 End‐I 1.57 C18

B115 T1‐Story1 B30/50 Middle 1.48 C18

B115 T1‐Story1 B30/50 End‐J 1.54 C18

B145 T1‐Story1 B30/50 End‐I 1.44 C18

B145 T1‐Story1 B30/50 Middle 1.14 C18

B145 T1‐Story1 B30/50 End‐J 1.39 C18

B146 T1‐Story1 B30/50 End‐I 1.01 C18

Page 56: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 56/104

B146 T1‐Story1 B30/50 Middle 0.86 C18

B146 T1‐Story1 B30/50 End‐J 1.16 C18

B147 T1‐Story1 B30/50 End‐I 1.06 C18

B147 T1‐Story1 B30/50 Middle 0.90 C18

B147 T1‐Story1 B30/50 End‐J 1.21 C18

B148 T1‐Story1 B30/50 End‐I 1.06 C18

B148 T1‐Story1 B30/50 Middle 0.91 C18

B148 T1‐Story1 B30/50 End‐J 1.22 C18

B149 T1‐

Story1 B30/50 End‐

I 1.03 C18B149 T1‐Story1 B30/50 Middle 0.88 C18

B149 T1‐Story1 B30/50 End‐J 1.18 C18

B150 T1‐Story1 B30/50 End‐I 1.42 C18

B150 T1‐Story1 B30/50 Middle 1.28 C18

B150 T1‐Story1 B30/50 End‐J 1.40 C18

B160 T1‐Story1 B30/50 End‐I O/S

B160 T1‐Story1 B30/50 Middle O/S

B160 T1‐Story1 B30/50 End‐J 3.73 C10

B161 T1‐Story1 B30/50 End‐I 2.07 C18

B161 T1‐Story1 B30/50 Middle 1.78 C18

B161 T1‐Story1 B30/50 End‐J 2.31 C18

B162 T1‐Story1 B30/50 End

‐I 0.66 C18

B162 T1‐Story1 B30/50 Middle 0.50 C18

B162 T1‐Story1 B30/50 End‐J 0.85 C18

B163 T1‐Story1 B30/50 End‐I 1.68 C18

B163 T1‐Story1 B30/50 Middle 1.62 C18

B163 T1‐Story1 B30/50 End‐J 2.29 C18

B164 T1‐Story1 B30/50 End‐I 2.30 C18

B164 T1‐Story1 B30/50 Middle 2.28 C18

B164 T1‐Story1 B30/50 End‐J 2.37 C18

B215 T1‐Story1 B25/50 End‐I 3.81 C10

B215 T1‐Story1 B25/50 Middle 2.57 C18

B215 T1‐

Story1 B25/50 End‐

J 3.50 C10B216 T1‐Story1 B25/50 End‐I 3.84 C10

B216 T1‐Story1 B25/50 Middle 2.39 C18

B216 T1‐Story1 B25/50 End‐J 3.28 C10

B217 T1‐Story1 B25/50 End‐I 2.11 C18

B217 T1‐Story1 B25/50 Middle 1.59 C18

B217 T1‐Story1 B25/50 End‐J 1.97 C18

B218 T1‐Story1 B25/50 End‐I 2.15 C18

B218 T1‐Story1 B25/50 Middle 1.60 C18

B218 T1‐Story1 B25/50 End‐J 1.98 C18

B219 T1‐Story1 B25/50 End‐I 3.68 C10

B219 T1‐Story1 B25/50 Middle 2.14 C18

B219 T1‐Story1 B25/50 End

‐J 2.70 C17

B220 T1‐Story1 B25/50 End‐I 3.63 C10

B220 T1‐Story1 B25/50 Middle 2.41 C18

B220 T1‐Story1 B25/50 End‐J 3.33 C10

B136 T1‐Story1 B25/50 End‐I 4.22 C18

B136 T1‐Story1 B25/50 Middle 4.41 C10

B136 T1‐Story1 B25/50 End‐J 4.57 C10

B137 T1‐Story1 B25/50 End‐I 4.49 C18

B137 T1‐Story1 B25/50 Middle 4.72 C10

B137 T1‐Story1 B25/50 End‐J 4.88 C10

Page 57: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 57/104

B138 T1‐Story1 B25/50 End‐I 4.48 C18

B138 T1‐Story1 B25/50 Middle 4.72 C10

B138 T1‐Story1 B25/50 End‐J 4.87 C10

B139 T1‐Story1 B25/50 End‐I 4.47 C18

B139 T1‐Story1 B25/50 Middle 4.70 C10

B139 T1‐Story1 B25/50 End‐J 4.86 C10

B140 T1‐Story1 B25/50 End‐I 4.34 C18

B140 T1‐Story1 B25/50 Middle 4.52 C10

B140 T1‐

Story1 B25/50 End‐

J 4.68 C10B141 T1‐Story1 B25/50 End‐I 3.40 C10

B141 T1‐Story1 B25/50 Middle 3.28 C10

B141 T1‐Story1 B25/50 End‐J 3.61 C10

B142 T1‐Story1 B25/50 End‐I 5.79 C10

B142 T1‐Story1 B25/50 Middle 5.63 C10

B142 T1‐Story1 B25/50 End‐J 5.32 C10

B143 T1‐Story1 B25/50 End‐I 4.54 C10

B143 T1‐Story1 B25/50 Middle 4.39 C10

B143 T1‐Story1 B25/50 End‐J 4.07 C10

B144 T1‐Story1 B25/50 End‐I 4.52 C10

B144 T1‐Story1 B25/50 Middle 4.36 C10

B144 T1‐Story1 B25/50 End

‐J 4.05 C10

B158 T1‐Story1 B25/50 End‐I 5.04 C10

B158 T1‐Story1 B25/50 Middle 4.88 C10

B158 T1‐Story1 B25/50 End‐J 4.57 C10

B159 T1‐Story1 B25/50 End‐I 2.09 C16

B159 T1‐Story1 B25/50 Middle 1.83 C16

B159 T1‐Story1 B25/50 End‐J 1.84 C16

B166 T1‐Story1 B25/50 End‐I 5.15 C10

B166 T1‐Story1 B25/50 Middle 5.00 C10

B166 T1‐Story1 B25/50 End‐J 4.76 C18

B167 T1‐Story1 B25/50 End‐I 5.15 C10

B167 T1‐

Story1 B25/50 Middle 4.99 C10B167 T1‐Story1 B25/50 End‐J 4.75 C18

B168 T1‐Story1 B25/50 End‐I 5.18 C10

B168 T1‐Story1 B25/50 Middle 5.02 C10

B168 T1‐Story1 B25/50 End‐J 4.79 C18

B169 T1‐Story1 B25/50 End‐I 4.75 C10

B169 T1‐Story1 B25/50 Middle 4.59 C10

B169 T1‐Story1 B25/50 End‐J 4.41 C18

B165 T1‐Story1 B25/50 End‐I 4.83 C10

B165 T1‐Story1 B25/50 Middle 4.67 C10

B165 T1‐Story1 B25/50 End‐J 4.48 C18

B170 T1‐Story1 B25/50 End‐I 4.53 C18

B170 T1‐Story1 B25/50 Middle 4.74 C10

B170 T1‐Story1 B25/50 End‐J 4.90 C10

B171 T1‐Story1 B25/50 End‐I 4.59 C18

B171 T1‐Story1 B25/50 Middle 4.83 C10

B171 T1‐Story1 B25/50 End‐J 4.98 C10

B172 T1‐Story1 B25/50 End‐I 4.60 C18

B172 T1‐Story1 B25/50 Middle 4.83 C10

B172 T1‐Story1 B25/50 End‐J 4.99 C10

B173 T1‐Story1 B25/50 End‐I 4.61 C18

B173 T1‐Story1 B25/50 Middle 4.83 C10

Page 58: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 58/104

B173 T1‐Story1 B25/50 End‐J 4.98 C10

B190 T1‐Story1 B30/50 End‐I 2.70 C18

B190 T1‐Story1 B30/50 Middle 2.48 C18

B190 T1‐Story1 B30/50 End‐J 2.81 C18

B191 T1‐Story1 B30/50 End‐I 2.28 C18

B191 T1‐Story1 B30/50 Middle 2.11 C18

B191 T1‐Story1 B30/50 End‐J 2.41 C18

B192 T1‐Story1 B30/50 End‐I 2.18 C18

B192 T1‐

Story1 B30/50 Middle 2.02 C18B192 T1‐Story1 B30/50 End‐J 2.31 C18

B193 T1‐Story1 B30/50 End‐I 2.24 C18

B193 T1‐Story1 B30/50 Middle 2.08 C18

B193 T1‐Story1 B30/50 End‐J 2.37 C18

B195 T1‐Story1 B30/50 End‐I 2.47 C18

B195 T1‐Story1 B30/50 Middle 2.30 C18

B195 T1‐Story1 B30/50 End‐J 2.43 C18

B116 T1‐Story1 B25/50 End‐I 2.21 C18

B116 T1‐Story1 B25/50 Middle 2.01 C18

B116 T1‐Story1 B25/50 End‐J 2.14 C18

B129 T1‐Story1 B25/50 End‐I 0.75 C18

B129 T1‐Story1 B25/50 Middle 0.82 C18

B129 T1‐Story1 B25/50 End‐J 1.05 C18

B130 T1‐Story1 B25/50 End‐I 0.85 C18

B130 T1‐Story1 B25/50 Middle 0.88 C18

B130 T1‐Story1 B25/50 End‐J 1.17 C18

B131 T1‐Story1 B25/45 End‐I 1.58 C18

B131 T1‐Story1 B25/45 Middle 1.83 C18

B131 T1‐Story1 B25/45 End‐J 2.15 C18

B132 T1‐Story1 B25/45 End‐I 0.75 C18

B132 T1‐Story1 B25/45 Middle 0.66 C18

B132 T1‐Story1 B25/45 End‐J 0.99 C18

B133 T1‐

Story1 B25/45 End‐

I 1.56 C18B133 T1‐Story1 B25/45 Middle 1.79 C18

B133 T1‐Story1 B25/45 End‐J 2.12 C18

B134 T1‐Story1 B25/45 End‐I 0.75 C18

B134 T1‐Story1 B25/45 Middle 0.67 C18

B134 T1‐Story1 B25/45 End‐J 1.00 C18

B135 T1‐Story1 B25/45 End‐I 0.75 C18

B135 T1‐Story1 B25/45 Middle 0.67 C18

B135 T1‐Story1 B25/45 End‐J 0.99 C18

B151 T1‐Story1 B30/50 End‐I 2.29 C18

B151 T1‐Story1 B30/50 Middle 2.09 C18

B151 T1‐Story1 B30/50 End‐J 2.61 C18

B196 T1‐Story1 B25/45 End

‐I 2.97 C10

B196 T1‐Story1 B25/45 Middle 2.48 C18

B196 T1‐Story1 B25/45 End‐J 3.07 C10

B197 T1‐Story1 B25/45 End‐I 3.08 C10

B197 T1‐Story1 B25/45 Middle 2.51 C18

B197 T1‐Story1 B25/45 End‐J 3.00 C10

B198 T1‐Story1 B30/50 End‐I 2.11 C18

B198 T1‐Story1 B30/50 Middle 1.95 C18

B198 T1‐Story1 B30/50 End‐J 2.48 C18

B200 T1‐Story1 B20/35 End‐I 0.32 C18

Page 59: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 59/104

B200 T1‐Story1 B20/35 Middle 0.32 C18

B200 T1‐Story1 B20/35 End‐J 0.39 C18

B201 T1‐Story1 B20/35 End‐I 0.36 C18

B201 T1‐Story1 B20/35 Middle 0.43 C18

B201 T1‐Story1 B20/35 End‐J 0.40 C18

B252 T1‐Story1 B20/35 End‐I 2.24 C10

B252 T1‐Story1 B20/35 Middle 2.14 C10

B252 T1‐Story1 B20/35 End‐J 2.15 C10

B253 T1‐

Story1 B20/35 End‐

I 2.88 C10B253 T1‐Story1 B20/35 Middle 2.78 C10

B253 T1‐Story1 B20/35 End‐J 2.77 C10

B109 T1‐Story1 B20/35 End‐I 2.00 C10

B109 T1‐Story1 B20/35 Middle 2.33 C10

B109 T1‐Story1 B20/35 End‐J 2.53 C10

B202 T1‐Story1 B20/40 End‐I 1.48 C18

B202 T1‐Story1 B20/40 Middle 1.07 C18

B202 T1‐Story1 B20/40 End‐J 0.90 C18

B254 T1‐Story1 B20/40 End‐I 3.33 C10

B254 T1‐Story1 B20/40 Middle 3.10 C10

B254 T1‐Story1 B20/40 End‐J 2.64 C10

B255 T1‐Story1 B20/40 End

‐I 1.48 C18

B255 T1‐Story1 B20/40 Middle 1.07 C18

B255 T1‐Story1 B20/40 End‐J 0.90 C18

B256 T1‐Story1 B30/45 End‐I 4.19 C10

B256 T1‐Story1 B30/45 Middle 3.68 C10

B256 T1‐Story1 B30/45 End‐J 3.86 C10

B257 T1‐Story1 B30/45 End‐I 4.29 C10

B257 T1‐Story1 B30/45 Middle 3.96 C10

B257 T1‐Story1 B30/45 End‐J 4.46 C10

Page 60: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 60/104

Row Labels Max of  V

B20/35 2.88   2.88 2.78 2.77

RINGKASAN GAYA GESER EXTRIM 

En ‐I .

End‐J 2.77

Middle 2.78

B20/40 4.95   4.74 4.84 4.95

End‐I 4.74

End‐J 4.95Middle 4.84

b25 5.86   5.86 5.61 5.25

En ‐I .86

End‐J 5.25

Middle 5.61

B25/40 0.81   0.81 0.73 0.75

End‐I 0.81

End‐J 0.75

Middle 0.73

B25/45 3.08   3.08 2.52 3.07

En ‐I 3.08

End‐J 3.07

Middle 2.52B25/50 5.79   5.79 5.63 5.32

End‐I 5.79

End‐J 5.32

Middle 5.63

B30/45 14.72   14.39 14.55 14.72

End‐I 14.39

End‐J 14.72

Middle 14.55

B30/50 2.48   4.56 4.03 4.84

End‐I 4.56

End‐J 4.84

Middle 4.03

(blank) 0.00an .

Grand Total 2.48

Page 61: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 61/104

PERHITUNGAN

BALOK 

&

KOLOM

5

Page 62: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 62/104

PERENCANAAN BALOK 

BALOK  20X35TUMPUAN LAPANGAN

b =   20 cm b = 20 cm

h =   35 cm h = 35 cm

Mutu beton K   250   Mut u bet on K 250

Mutu baj a fy   40   (Tulangan utama)   Mutu baja fy 40  (Tulangan utama)

fy'   29   (Tulangan  geser)   fy' 29  (Tulangan  geser)

LOAD CASES LOAD CASES

M+ = 1.98 tm   (ETABS)   V = 2.88 t     (ETABS)   M+ = 1.71 tm   (ETABS)   V = 2.78 t     (ETABS)M‐ = 1.25 tm   (ETABS)   M‐ = 0.98 tm   (ETABS)

Tul. 2D13 Tul. 8 ‐ 150 Tul. 2D13 Tul.   8   ‐ 175

DATA PROCESSING DATA PROCESSING

Besi beton D   13   mm Besi beton D   13 mm

Sengkang   1 d 8   mm

Selimut beton = 30 mm Selimut beton = 30 mm

d' = 31.35 mm d' = 31.35 mm

a. Tulangan tarik a. Tulangan tarik

d' = 31.35 cm d' = 34.35 cm

Rn   =   Rn   =

  b d'2

  b d'2

= =

0.9 20 0.9 20

= 11.19 = 8.05

m = m =

0.85   f'c   0.85   f'c

= =

0.85 208 0.85 208

= =

982.82 1,179.92

f y   f y

4000 4000

22.68 22.68

Mn   Mn

198,000 171,000

  = 1     = 1

m m

= 1 = 1

22.68 22.68

= =

r    = 1 .3 3     r    = 1 .33  

= =

min   = 1.4   min   = 1.4

f y   f y

= =

pakai   =   pakai   =

As   =   pakai   b d'   As   =   pakai   b d'

= 20 31.35 = 20 34.35

= cm2 = cm2

Dipakai 2 D 13   ( 2.65 )   Dipakai 2 D 13   ( 2.65 )

b. Tulangan Tekan b. Tulangan Tekan

d' = 31.35 cm r pakai = 31.35 cm

Rn   =   Rn   =

  b d'

2

  b d'

2

= =

0.9 20 0.9 20

= 7.07 = 5.54

m = m =

0.85   f'c   0.85   f'c

= =

0.85 208 0.85 208

= =

  = 1     = 1

22.68 22.68

* *

982.82 982.82

f y   f y

4000 4000

Mn   Mn

125,000 98,000

0.00289 0.00206

0.0038 0.0027

0.0035 0.0035

0.0038 0.0035

0.0038 0.0035

2.41 2.40

0.0467

* *

* 0.0656 *

 

 

  fy

 Rnm **211

 

 

  fy

 Rnm **211

 

  

 

  fy

 Rnm **211

 

  

 

  fy

 Rnm **211

8

Page 63: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 63/104

m m

= 1 = 1

22.68 22.68

= =

r    = 1 .3 3     r    = 1 .33  

= =

min   = 1.4   min   = 1.4f y   f y

= =

pakai   =   pakai   =

As   =   pakai   b d'   As   =   pakai   b d'

= 20 31.35 = 20 31.35

= cm2 = cm2

Dipakai 2 D 13   ( 2.65 )   Dipakai 2 D 13   ( 2.65 )

c. Tulangan susut c. Tulangan susut

 As   = As As   = As

= =

= cm2 = cm2

Dipakai   =   1 Ø   12   (Tulangan susut) Dipakai   =   1 Ø   12   (Tulangan susut)

d. Tulangan geser d. Tulangan geser  

fy = 2900  kg/cm2   fy = 2900  kg/cm2

R = 2.88 ton R = 2.78 ton

Vc   = 1 /6   f'c   b d   Vc   = 1 /6   f'c   b d

2.19 2.19

0.0035 0.0035

0.0035 0.0035

0.0035 0.0035

0.0319

0.00180 0.00141

0.0024 0.0019

* 0.0409 *

10% 10%

10% 2.41 10% 2.40

0.24 0.24

 

 

  fy  

  

  fy

= 0.167 14.4 20 35 = 0.167 14.4 20 35

= 1.68 ton = 1.68 ton

Ø begel   =   8   mm   Ø begel   =   8   mm

Av   = 0.5 0 cm2   Av   = 1 .00 c m2

s =   Av   f y   d s =   Av   f y   d

Vu   ‐   Vc   Vu   ‐   Vc

Ø Ø

= 0.50 35 = 1.00 35

2,880 ‐ 2,780 ‐

0.6 0.6

= =

= cm = cm

s min   = d   s min   = d

2 2

= 35 = 35

2 2

= 17.5 cm = 17.5 cm

s pakai   = 1 6.3 5 c m   s pakai   = 1 7.5 0 c m

Dipakai   =   Ø 8   ‐   150 Dipakai   =   Ø 8   ‐   175

2D13 2D13

Ø8‐150 350 mm Ø8‐175 350 mm

2D13 2D13

200 mm 200 mm

50,994 101,987

3,119 2,953

16.35 34.54

(As =6.7  cm2) (As =5.74 cm2)

1,681 1,681

2900 2900

8

Page 64: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 64/104

PERENCANAAN BALOK 

BALOK  20X40TUMPUAN LAPANGAN

b =   20 cm b = 20 cm

h =   40 cm h = 40 cm

Mutu beton K   250   Mut u bet on K 250

Mutu baj a fy   40   (Tulangan utama)   Mutu baja fy 40  (Tulangan utama)

fy'   29   (Tulangan  geser)   fy' 29  (Tulangan  geser)

LOAD CASES LOAD CASES

M+ = 2.59 tm   (ETABS)   V = 4.95 t     (ETABS)   M+ = 1.26 tm   (ETABS)   V = 4.84 t     (ETABS)M‐ = 2.34 tm   (ETABS)   M‐ = 1.46 tm   (ETABS)

Tul. 2D16 Tul. 8 ‐ 150 Tul. 2D16 Tul.   8   ‐ 175

DATA PROCESSING DATA PROCESSING

Besi beton D   16   mm Besi beton D   16 mm

Sengkang   2 d 8   mm

Selimut beton = 30 mm Selimut beton = 30 mm

d' = 36.2 mm d' = 36.2 mm

a. Tulangan tarik a. Tulangan tarik

d' = 36.2 cm d' = 39.2 cm

Rn   =   Rn   =

  b d'2

  b d'2

= =

0.9 20 0.9 20

= 10.98 = 4.56

m = m =

0.85   f'c   0.85   f'c

= =

0.85 208 0.85 208

= =

f y   f y

4000 4000

22.68 22.68

Mn   Mn

259,000 126,000

1,310.44 1,536.64

  = 1     = 1

m m

= 1 = 1

22.68 22.68

= =

r    = 1 .3 3     r    = 1 .33  

= =

min   = 1.4   min   = 1.4

f y   f y

= =

pakai   =   pakai   =

As   =   pakai   b d'   As   =   pakai   b d'

= 20 36.20 = 20 39.20

= cm2 = cm2

Dipakai 2 D 16   ( 4.02 )   Dipakai 2 D 16   ( 4.02 )

b. Tulangan Tekan b. Tulangan Tekan

d' = 36.2 cm r pakai = 36.2 cm

Rn   =   Rn   =

  b d'

2

  b d'

2

= =

0.9 20 0.9 20

= 9.92 = 6.19

m = m =

0.85   f'c   0.85   f'c

= =

0.85 208 0.85 208

= =

  = 1     = 1* *

f y   f y

4000 4000

22.68 22.68

Mn   Mn

234,000 146,000

1,310.44 1,310.44

0.0038 0.0035

0.0038 0.0035

2.73 2.74

0.00284 0.00115

0.0038 0.0015

0.0035 0.0035

* *

* 0.0643 * 0.0262

 

 

  fy

 Rnm **211

 

 

  fy

 Rnm **211

 

  

 

  fy

 Rnm **211

 

  

 

  fy

 Rnm **211

8

Page 65: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 65/104

m m

= 1 = 1

22.68 22.68

= =

r    = 1 .3 3     r    = 1 .33  

= =

min   = 1.4   min   = 1.4f y   f y

= =

pakai   =   pakai   =

As   =   pakai   b d'   As   =   pakai   b d'

= 20 36.20 = 20 36.20

= cm2 = cm2

Dipakai 2 D 16   ( 4.02 )   Dipakai 2 D 16   ( 4.02 )

c. Tulangan susut c. Tulangan susut

 As   = As As   = As

= =

= cm2 = cm2

Dipakai   =   1 Ø   12   (Tulangan susut) Dipakai   =   1 Ø   12   (Tulangan susut)

d. Tulangan geser d. Tulangan geser  

fy = 2900  kg/cm2   fy = 2900  kg/cm2

R = 4.95 ton R = 4.84 ton

Vc   = 1 /6   f'c   b d   Vc   = 1 /6   f'c   b d

0.27 0.27

10% 10%

10% 2.73 10% 2.74

0.0035 0.0035

0.0035 0.0035

2.53 2.53

0.00255 0.00158

0.0034 0.0021

0.0035 0.0035

* 0.0579 * 0.0357

 

 

  fy  

  

  fy

= 0.167 14.4 20 40 = 0.167 14.4 20 40

= 1.92 ton = 1.92 ton

Ø begel   =   8   mm   Ø begel   =   8   mm

Av   = 1.0 0 cm2   Av   = 1 .00 c m2

s =   Av   f y   d s =   Av   f y   d

Vu   ‐   Vc   Vu   ‐   Vc

Ø Ø

= 1.00 40 = 1.00 40

4,950 ‐ 4,840 ‐

0.6 0.6

= =

= cm = cm

s min   = d   s min   = d

2 2

= 40 = 40

2 2

= 20 cm = 20 cm

s pakai   = 1 8.4 2 c m   s pakai   = 1 8.9 6 c m

Dipakai   =   Ø 8   ‐   150   Dipakai   =   Ø 8   ‐   175

2D16 2D16

Ø8‐150 400 mm Ø8‐175 400 mm

2D16 2D16

200 mm 200 mm

(As =6.7  cm2) (As =5.74 cm2)

116,557 116,557

6,329 6,146

18.42 18.96

2900 2900

1,921 1,921

8

Page 66: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 66/104

PERENCANAAN BALOK 

BALOK  25X45TUMPUAN LAPANGAN

b =   25 cm b = 25 cm

h =   45 cm h = 45 cm

Mutu beton K   250   Mutu beton K 250

Mu tu b aj a fy   40   (Tulangan 

utama)   Mutu baja fy 40  (Tulangan 

utama)

fy'   29   (Tulangan  geser)   fy' 29  (Tulangan  geser)

LOAD CASES LOAD CASES

M+ = 2.70 tm   (ETABS)   V = 3.08 t     (ETABS)   M+ = 1.44 tm   (ETABS)   V = 2.52 t     (ETABS)

M‐ = 2.45 tm   (ETABS)   M‐ = 3.56 tm   (ETABS)

Tul. 5D16 Tul. 8 ‐ 100 Tul. 3D16 Tul.   8   ‐ 125

DATA PROCESSING DATA PROCESSING

Besi beton D   16   mm Besi beton D   16 mm

Sengkang   2 d 8   mm

Selimut beton = 30 mm Selimut beton = 30 mm

d' = 41.2 mm d' = 41.2 mm

a. Tulangan tarik a. Tulangan tarik

d' = 41.2 cm d' = 44.2 cm

Rn   =   Rn   =

  b d'2

  b d'2

= =

0.9 25 0.9 25

= 7.07 = 3.28

m = m =

0.85   f'c   0.85   f'c

= =

0.85 208 0.85 208

f y   f y

4000 4000

Mn   Mn

270,000 144,000

1,697.44 1,953.64

= =

  = 1     = 1

m m

= 1 = 1

22.68 22.68

= =

r    = 1 .33     r    = 1 .33  

= =

min   = 1.4   min   = 1.4

f y   f y

= =

pakai   =   pakai   =

As   =   pakai   b d'   As   =   pakai   b d'

= 25 41.20 = 25 44.20

= cm2 = cm2

Dipakai 5 D 16   ( 10.05 )   Dipakai 3 D 16   ( 6.03 )

b. Tulangan Tekan b. Tulangan Tekan

d' = 41.2 cm r pakai = 41.2 cm

Rn   =   Rn   =

  b d'2

  b d'2

= =

0.9 25 0.9 25

= 6.41 = 9.32

m = m =

0.85   f'c   0.85   f'c

f y   f y

Mn   Mn

245,000 356,000

1,697.44 1,697.44

0.0035 0.0035

0.0035 0.0035

3.61 3.87

0.00180 0.00083

0.0024 0.0011

0.0035 0.0035

* *

* 0.0409 * 0.0187

22.68 22.68

 

  

 

  fy

 Rnm  **211

 

  

 

  fy

 Rnm  **211

8

Page 67: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 67/104

= =

0.85 208 0.85 208

= =

  = 1     = 1

m m

= 1 = 1

22.68 22.68

= =

r    = 1 .33     r    = 1 .33  

= =

min   = 1.4   min   = 1.4

f y   f y

= =

pakai   =   pakai   =

As   =   pakai   b d'   As   =   pakai   b d'

= 25 41.20 = 25 41.20

= cm2 = cm2

Dipakai 3 D 16   ( 6.03 )   Dipakai 5 D 16   ( 10.05 )

d. Tulangan geser d. Tulangan geser  

fy = 2900  kg/cm2   fy = 2900  kg/cm2

R = 3.08 ton R = 2.52 ton

Vc   = 1/6   f'c   b d   Vc   = 1/6   f'c   b d

0.0035 0.0035

0.0035 0.0035

3.61 3.61

0.00163 0.00240

0.0022 0.0032

0.0035 0.0035

* *

* 0.0371 * 0.0543

4000 4000

22.68 22.68

 

  

 

  fy

 Rnm **211

 

  

 

  fy

 Rnm  **211

= 0.167 14.4 25 45 = 0.167 14.4 25 45

= 2.70 ton = 2.70 ton

Ø begel   =   8   mm   Ø begel   =   8   mm

Av   = 1.00 cm2   Av   = 1.00 cm 2

s =   Av   f y   d s =   Av   f y   d

Vu   ‐   Vc   Vu   ‐   Vc

Ø Ø

= 1.00 45 = 1.00 45

3,080 ‐ 2,520 ‐

0.6 0.6

= =

= cm = cm

s min   = d   s min   = d

2 2

= 45 = 45

2 2

= 22.5 cm = 22.5 cm

s pakai   = 2 2. 50 c m   s pakai   = 2 2. 50 cm

Dipakai   =   Ø 8   ‐   100   Dipakai   =   Ø 8   ‐   125

5D16 3D16

Ø8‐100 450 mm Ø8‐125 450 mm

3D16 5D16

250 mm 250 mm

(As =10.05 cm2) (As =8.04 cm2)

131,126 131,126

2,432 1,499

53.91 87.47

2900 2900

2,701 2,701

8

Page 68: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 68/104

PERENCANAAN BALOK 

BALOK  30X50TUMPUAN LAPANGAN

b =   30  cm b = 30 cm

h =   50  cm h = 50 cm

Mutu beton K   250   M utu be ton K 250

M ut u b aj a fy   40  (Tulangan utama)   Mutu baja fy 40  (Tulangan utama)

fy'   29  (Tulangan  geser)   fy' 29  (Tulangan  geser)

LOAD CASES LOAD CASES

M+ =   5.52   tm   (ETABS)   V =   4.84   t    (ETABS)   M+ =   2.21   tm   (ETABS)   V =   4.03   t    (ETABS)

M‐ =   6.06   tm   (ETABS)   M‐ =   7.54   tm   (ETABS)

Tul. 6D16 Tul. 8 ‐ 100 Tul. 3D16 Tul.   8   ‐ 150

DATA PROCESSING DATA PROCESSING

Besi beton D   16   mm Besi beton D   16 mm

Sengkang   2 d 8   mm

Selimut beton = 30 mm Selimut beton = 30 mm

d' = 46.2 mm d' = 46.2 mm

a. Tulangan tarik a. Tulangan tarik

d' = 46.2 cm d' = 49.2 cm

Rn   =   Rn   =

  b d'2

  b d'2

= =

0.9 30 0.9 30

= 9.58 = 3.38

m = m =

0.85   f'c   0.85   f'c

= =

0.85 208 0.85 208

= =

  = 1     = 1* *

f y   f y

4000 4000

22.68 22.68

Mn   Mn

552,000 221,000

2,134.44 2,420.64

    Rnm  **2       Rnm **2

m m

= 1 = 1

22.68 22.68

= =

r    = 1 .33     r    = 1 .33  

= =

min   = 1.4   min   = 1.4

f y

  f y

= =

pakai   =   pakai   =

As   =   pakai   b d'   As   =   pakai   b d'

= 30 46.20 = 30 49.20

= cm2 = cm2

Dipakai 6 D 16   ( 12.06 )   Dipakai 3 D 16   ( 6.03 )

b. Tulangan Tekan b. Tulangan Tekan

d' = 46.2 cm r pakai = 46.2 cm

Rn   =   Rn   =

  b d'2

  b d'2

= =

0.9 30 0.9 30

= 10.52 = 13.08

m = m =

0.85   f'c   0.85   f'c

= =

0.85 208 0.85 208

= =

f y   f y

4000 4000

22.68 22.68

Mn   Mn

606,000 754,000

2,134.44 2,134.44

0.0035 0.0035

0.0035 0.0035

4.85 5.17

0.00246 0.00085

0.0033 0.0011

0.0035 0.0035

* 0.0559 * 0.0194

 

 

  fy  

  

  fy

8

Page 69: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 69/104

  = 1     = 1

m m

= 1 = 1

22.68 22.68

= =

r    = 1 .33     r    = 1 .33  

= =

min   = 1.4   min   = 1.4

f y   f y

= =

pakai   =   pakai   =

As   =   pakai   b d'   As   =   pakai   b d'

= 30 46.20 = 30 46.20

= cm2 = cm2

Dipakai 3 D 16   ( 6.03 )   Dipakai 6 D 16   ( 12.06 )

d. Tulangan geser d. Tulangan geser  

fy = 2900   kg/cm2   fy = 2900   kg/cm2

R = 4.84 ton R = 4.03 ton

Vc   = 1 /6   f'c   b d   Vc   = 1 /6   f'c   b d

= 0.167 14.4 30 50 = 0.167 14.4 30 50

= 3.60 ton = 3.60 ton

Ø begel   =   8   mm   Ø begel   =   8   mm

Av   = 1.00 c m2   Av   = 1.00 cm2

s =   Av   f y   d s =   Av   f y   d

0.0036 0.0045

0.0036 0.0045

5.00 6.27

0.00271 0.00340

0.0036 0.0045

0.0035 0.0035

* *

* 0.0615 * 0.0772

 

  

 

  fy

 Rnm  **211

 

  

 

  fy

 Rnm **211

Vu   ‐   Vc   Vu   ‐   Vc

Ø Ø

= 1.00 50 = 1.00 50

4,840 ‐ 4,030 ‐

0.6 0.6

= =

= cm = cm

s min   = d   s min   = d

2 2

= 50 = 50

2 2

= 25 cm = 25 cm

s pakai   = 2 5. 00 c m   s pakai   = 2 5.00 c m

Dipakai   =   Ø 8   ‐   100   Dipakai   =   Ø 8   ‐   150

6D16 3D16

Ø8‐100 500 mm Ø8‐150 500 mm

3D16 6D16

300 mm 300 mm

(As =10.05 cm2) (As =6.7  cm2)

145,696 145,696

4,465 3,115

32.63 46.77

2900 2900

3,601 3,601

8

Page 70: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 70/104

TABLE:  Concrete Column PMM Envelope

Label Story Section Location P M Major M Minor PMM Combo

tonf tonf  ‐m tonf  ‐m

C10 T1‐Story1 k40 Top 21.98 0.00 0.00 C08

C10 T1‐Story1 k40 Bottom 35.88 0.00 0.02 C02

C11 T1‐Story1 k40 Top 18.65 0.27 0.00 C09

C11 T1‐Story1 k40 Bottom 26.44 0.00 0.24 C02

C12 T1‐Story1 k40 Bottom 33.41 0.00 0.00 C02

C12 T1‐Story1 k40 Top 16.07 0.02 0.00 C04

C13 T1‐Story1 k40 Top 17.38 0.00 0.00 C04

C13 T1‐Story1 k40 Bottom 31.71 0.02 0.00 C02

C14 T1‐Story1 k40 Top 16.06 0.27 0.00 C04

C14 T1‐Story1 k40 Bottom 32.13 0.00 0.24 C02

C15 T1‐Story1 k40 Bottom 31.69 0.00 0.00 C02

C15 T1‐Story1 k40 Top 14.65 0.02 0.00 C04

C16 T1‐Story1 k40 Top 16.53 0.00 0.00 C04

C16 T1‐Story1 k40 Bottom 33.13 0.02 0.00 C02

C17 T1‐Story1 k40 Bottom 30.91 0.00 0.00 C02

C17 T1‐Story1 k40 Top 6.40 0.02 0.00 C11

C19 T1‐Story1 k40 Bottom 12.62 0.00 0.00 C02

C19 T1‐Story1 k40 Top 11.47 0.02 0.00 C02

C20 T1‐Story1 K40/60 Top 32.64 0.00 0.00 C03

C20 T1‐Story3 K40/60 Top 0.00 0.00 0.02 C02

C20 T1‐Story1 K40/60 Bottom 41.66 0.00 0.00 C02

C20 T1‐Story3 K40/60 Bottom 0.62 0.02 0.00 C06

C20 T1‐Story2 K40/60 Top 32.31 2.35 1.04 C02

C20 T1‐Story2 K40/60 Bottom 22.26 1.33 1.21 C06

C21 T1‐Story3 K40/60 Bottom 8.64 0.99 0.96 C02

C21 T1‐Story3 K40/60 Top 8.02 0.99 0.36 C02

C22 T1‐Story1 K40/60 Bottom 65.24 0.99 1.02 C02

C22 T1‐Story1 K40/60 Top 63.17 1.00 0.40 C02

C22 T1‐Story2 K40/60 Top 39.86 2.57 0.57 C05

C22 T1‐Story2 K40/60 Bottom 63.17 1.67 0.40 C02

C23 T1‐Story2 K40/60 Bottom 40.23 7.72 6.12 C05

C23 T1‐Story2 K40/60 Top 39.02 4.03 2.69 C05

C23 T1‐Story1 K40/60 Bottom 64.80 15.02 1.18 C02

C23 T1‐Story1 K40/60 Top 40.23 8.54 1.93 C05

C24 T1‐Story1 K40/60 Bottom 64.94 16.45 1.15 C02

C24 T1‐Story1 K40/60 Top 39.74 10.53 1.19 C05

C24 T1‐Story2 K40/60 Bottom 39.74 17.91 1.14 C05

C24 T1‐Story2 K40/60 Top 38.53 11.45 1.18 C05

C25 T1‐Story3 K40/60 Bottom 0.62 10.45 4.00 C05

C25 T1‐Story3 K40/60 Top 0.00 16.89 1.95 C02

C26 T1‐Story1 K40/60 Bottom 33.69 7.98 6.42 C02

C26 T1‐Story2 K40/60 Top 15.89 3.94 2.61 C05

C26 T1‐Story2 K40/60 Bottom 9.82 15.74 1.19 C13

C26 T1‐Story1 K40/60 Top 8.92 9.28 1.93 C13

C28 T1‐Story1 K40/60 Top 7.57 17.22 1.17 C10

C28 T1‐Story1 K40/60 Bottom 14.52 11.01 1.21 C02

C29 T1‐Story1 K40/60 Bottom 41.24 18.66 1.15 C02

Page 71: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 71/104

C29 T1‐Story3 K40/60 Top 0.00 11.92 1.19 C02

C29 T1‐Story2 K40/60 Top 32.09 11.60 4.02 C02

C29 T1‐Story1 K40/60 Top 32.23 17.05 1.96 C05

C29 T1‐Story3 K40/60 Bottom 0.62 0.02 0.00 C04

C29 T1‐Story2 K40/60 Bottom 22.03 0.09 0.29 C04

C30 T1‐Story3 K40/60 Bottom 8.64 1.33 1.21 C02

C30 T1‐Story3 K40/60 Top 8.02 3.33 0.71 C02

C31 T1‐Story3 K40/60 Top 0.00 0.99 0.36 C02

C31 T1‐Story1 K40/60 Bottom 63.25 1.02 3.04 C02

C31 T1‐Story3 K40/60 Bottom 0.62 1.00 0.40 C04

C31 T1‐Story2 K40/60 Top 40.07 1.03 3.08 C03

C31 T1‐Story1 K40/60 Top 61.18 1.67 0.40 C02

C31 T1‐Story2 K40/60 Bottom 63.33 3.43 0.56 C02

C32 T1‐Story2 K40/60 Top 39.40 13.47 1.94 C03

C32 T1‐Story3 K40/60 Top 0.00 0.00 2.03 C02

C32 T1‐Story3 K40/60 Bottom 0.62 19.26 1.09 C03

C32 T1‐Story2 K40/60 Bottom 40.61 0.00 1.84 C03

C32 T1‐Story1 K40/60 Top 40.21 18.65 1.10 C03

C32 T1‐Story1 K40/60 Bottom 63.06 2.26 0.00 C02

C33 T1‐Story2 K40/60 Top 38.80 12.86 1.95 C03

C33 T1‐Story3 K40/60 Bottom 0.62 2.49 0.00 C04

C33 T1‐Story3 K40/60 Top 0.00 3.13 2.65 C02

C33 T1‐Story1 K40/60 Top 39.61 1.32 0.00 C03

C33 T1‐Story1 K40/60 Bottom 63.07 3.13 2.65 C02

C33 T1‐Story2 K40/60 Bottom 40.01 1.32 0.00 C03

C34 T1‐Story3 K40/60 Top 0.00 3.22 2.57 C02

C34 T1‐Story3 K40/60 Bottom 0.62 1.39 0.00 C03

C35 T1‐Story2 K40/60 Bottom 9.90 4.37 1.77 C11

C35 T1‐Story2 K40/60 Top 16.05 0.63 0.00 C03

C35 T1‐Story1 K40/60 Bottom 33.05 3.22 2.58 C02

C35 T1‐Story3 K40/60 Bottom 0.62 1.40 0.00 C04

C35 T1‐Story3 K40/60 Top 0.00 4.37 1.78 C02

C35 T1‐Story1 K40/60 Top 9.34 0.63 0.00 C11

C36 T1‐Story1 k40 Bottom 24.18 1.26 3.32 C02

C36 T1‐Story1 k40 Top 13.25 0.66 0.00 C10

C37 T1‐Story1 k40 Bottom 35.47 1.08 2.83 C02

C37 T1‐Story2 K40/60 Bottom 2.18 0.98 0.00 C07

C37 T1‐Story1 k40 Top 23.44 1.55 3.09 C07

C37 T1‐Story2 K40/60 Top 0.62 0.72 0.00 C02

C37 T1‐Story3 K40/60 Top 0.00 7.23 1.29 C02

C37 T1‐Story3 K40/60 Bottom 0.62 0.91 0.00 C02

C38 T1‐Story1 k40 Bottom 27.42 8.84 0.97 C02

C38 T1‐Story1 k40 Top 13.77 0.86 0.00 C05

C39 T1‐Story1 k40 Top 15.51 10.14 1.05 C06

C39 T1‐Story1 k40 Bottom 33.00 0.88 0.00 C02

C40 T1‐Story1 k40 Top 17.37 11.35 1.07 C06

C40 T1‐Story1 k40 Bottom 31.74 0.86 0.00 C02

C41 T1‐Story1 k40 Bottom 31.98 12.40 1.32 C02

C41 T1‐Story1 k40 Top 15.90 0.90 0.00 C06

C42 T1‐Story1 k40 Bottom 31.77 9.55 1.92 C02

Page 72: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 72/104

C42 T1‐Story1 k40 Top 14.73 0.84 0.00 C06

C43 T1‐Story1 k40 Bottom 33.21 3.07 3.05 C02

C43 T1‐Story1 k40 Top 16.65 0.34 0.00 C06

C44 T1‐Story1 k40 Top 6.08 5.64 3.37 C13

C44 T1‐Story1 k40 Bottom 30.52 1.38 0.00 C02

C45 T1‐Story1 k40 Top 14.34 8.54 1.93 C09

C45 T1‐Story1 k40 Bottom 25.94 0.00 2.00 C02

C46 T1‐Story3 k40 Bottom 5.53 10.53 1.19 C10

C46 T1‐Story1 k40 Top 27.99 0.00 1.98 C08

C46 T1‐Story2 k40 Bottom 7.29 11.45 1.18 C02

C46 T1‐Story3 k40 Top 6.07 0.00 1.99 C02

C46 T1‐Story1 k40 Bottom 45.52 17.19 1.75 C02

C46 T1‐Story2 k40 Top 5.53 0.00 0.97 C10

C47 T1‐Story1 k40 Top 14.67 2.14 5.16 C09

C47 T1‐Story1 k40 Bottom 26.21 0.48 0.00 C02

C48 T1‐Story1 k40 Top 65.37 5.62 3.29 C02

C48 T1‐Story2 k40 Top 35.39 1.37 0.00 C02

C48 T1‐Story3 k40 Top 35.20 9.27 1.86 C02

C48 T1‐Story1 k40 Bottom 66.52 0.00 1.93 C02

C48 T1‐Story3 k40 Bottom 35.39 11.01 1.19 C02

C48 T1‐Story2 k40 Bottom 36.43 0.00 1.93 C02

C49 T1‐Story1 k40 Bottom 26.23 11.92 1.17 C02

C49 T1‐Story1 k40 Top 14.65 0.00 1.93 C09

C50 T1‐Story1 k40 Top 65.44 16.87 1.79 C02

C50 T1‐Story3 k40 Bottom 35.52 1.10 0.00 C02

C50 T1‐Story2 k40 Bottom 36.56 1.24 3.35 C02

C50 T1‐Story2 k40 Top 35.52 0.66 0.00 C02

C50 T1‐Story3 k40 Top 35.33 0.92 2.64 C02

C50 T1‐Story1 k40 Bottom 66.60 0.97 0.00 C02

C51 T1‐Story1 k40 Bottom 26.17 3.36 0.95 C02

C51 T1‐Story1 k40 Top 14.49 0.75 0.00 C10

C52 T1‐Story2 k40 Bottom 5.67 7.39 1.31 C02

C52 T1‐Story1 k40 Top 26.10 0.90 0.00 C07

C52 T1‐Story3 k40 Bottom 4.64 9.18 0.98 C02

C52 T1‐Story3 k40 Top 4.45 0.86 0.00 C02

C52 T1‐Story2 k40 Top 4.64 10.50 1.06 C02

C52 T1‐Story1 k40 Bottom 43.28 0.87 0.00 C02

C53 T1‐Story1 k40 Top 8.53 11.71 1.12 C17

C53 T1‐Story1 k40 Bottom 20.88 0.87 0.00 C02

C54 T1‐Story1 k40 Top 4.91 12.72 1.31 C16

C54 T1‐Story1 k40 Bottom 17.34 0.90 0.00 C02

C55 T1‐Story1 k40 Bottom 20.43 9.52 1.85 C02

C55 T1‐Story1 k40 Top 9.72 0.83 0.00 C17

C56 T1‐Story1 k40 Top 4.29 0.44 4.35 C16

C56 T1‐Story1 k40 Bottom 16.59 0.71 0.00 C02

C57 T1‐Story1 k40 Bottom 22.44 1.36 3.64 C02

C57 T1‐Story1 k40 Top 15.58 1.24 0.00 C09

C58 T1‐Story1 k40 Bottom 18.15 0.40 4.66 C02

C58 T1‐Story1 k40 Top 18.08 0.71 0.00 C02

C59 T1‐Story1 k40 Bottom 20.58 1.78 2.27 C02

Page 73: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 73/104

C59 T1‐Story1 k40 Top 7.38 1.81 0.00 C12

C60 T1‐Story1 k40 Bottom 16.63 0.49 4.62 C02

C60 T1‐Story1 k40 Top 4.40 0.71 0.00 C17

C61 T1‐Story1 k40 Top 8.52 1.78 2.29 C18

C61 T1‐Story1 k40 Bottom 20.81 1.81 0.00 C02

C62 T1‐Story1 k40 Bottom 22.75 0.42 4.39 C02

C62 T1‐Story1 k40 Top 13.71 0.71 0.00 C07

C63 T1‐Story1 k40 Bottom 17.34 1.42 3.93 C02

C63 T1‐Story1 k40 Top 4.91 1.18 0.00 C15

C64 T1‐Story1 k40 Bottom 21.07 2.55 2.43 C02

C64 T1‐Story1 k40 Top 7.93 0.57 0.00 C09

C65 T1‐Story1 k40 Top 9.73 1.90 1.96 C18

C65 T1‐Story1 k40 Bottom 20.38 0.47 0.00 C02

C66 T1‐Story1 k40 Top 17.89 1.69 3.93 C08

C66 T1‐Story1 k40 Bottom 26.07 0.56 0.00 C02

C67 T1‐Story1 k40 Bottom 16.60 1.70 1.78 C02

C67 T1‐Story1 k40 Top 4.29 0.45 0.00 C15

C68 T1‐Story1 k40 Bottom 54.14 0.42 1.54 C02

C68 T1‐Story1 k40 Top 36.85 0.61 0.00 C08

C69 T1‐Story1 k40 Top 15.58 0.49 0.03 C10

C69 T1‐Story1 k40 Bottom 22.42 0.50 0.00 C02

C70 T1‐Story1 k40 Top 37.20 2.74 1.22 C07

C70 T1‐Story1 k40 Bottom 54.25 0.56 0.00 C02

C71 T1‐Story1 k40 Top 18.12 2.15 1.88 C02

C71 T1‐Story1 k40 Bottom 18.19 0.45 0.00 C02

C72 T1‐Story1 k40 Top 15.15 1.57 1.76 C07

C72 T1‐Story1 k40 Bottom 23.60 0.61 0.00 C02

C73 T1‐Story1 k40 Bottom 20.56 1.73 1.95 C02

C73 T1‐Story1 k40 Top 7.38 0.57 0.00 C14

C74 T1‐Story2 K40/60 Bottom 74.60 2.55 2.43 C02

C74 T1‐Story2 K40/60 Top 71.32 0.57 0.00 C02

C75 T1‐Story1 k40 Bottom 16.65 1.87 1.96 C02

C75 T1‐Story1 k40 Top 5.33 0.47 0.00 C15

C76 T1‐Story2 K40/60 Bottom 67.47 1.69 3.93 C02

C76 T1‐Story2 K40/60 Top 39.98 0.56 0.00 C03

C77 T1‐Story1 k40 Top 13.49 1.67 1.78 C08

C77 T1‐Story1 k40 Bottom 22.50 0.45 0.00 C02

C78 T1‐Story2 K40/60 Top 40.29 0.42 1.54 C05

C78 T1‐Story2 K40/60 Bottom 67.86 0.61 0.00 C02

C79 T1‐Story1 k40 Top 7.93 0.49 0.03 C10

C79 T1‐Story1 k40 Bottom 21.09 0.49 0.00 C02

C80 T1‐Story2 K40/60 Bottom 74.76 2.77 1.22 C02

C80 T1‐Story2 K40/60 Top 71.47 0.56 0.00 C02

C81 T1‐Story1 k40 Bottom 34.54 1.83 2.12 C02

C81 T1‐Story1 k40 Top 20.50 0.45 0.00 C03

C82 T1‐Story1 k40 Bottom 33.80 1.76 1.72 C02

C82 T1‐Story1 k40 Top 21.65 0.62 0.00 C05

C83 T1‐Story1 k40 Bottom 33.79 1.75 1.95 C02

C83 T1‐Story1 k40 Top 21.65 0.57 0.00 C03

C84 T1‐Story1 k40 Top 20.74 1.04 4.00 C05

Page 74: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 74/104

C84 T1‐Story1 k40 Bottom 34.80 0.71 0.00 C02

C85 T1‐Story2 k40 Bottom 48.63 1.00 3.79 C02

C85 T1‐Story2 k40 Top 30.37 1.47 0.00 C06

C86 T1‐Story2 k40 Top 30.35 1.01 3.77 C04

C86 T1‐Story2 k40 Bottom 48.62 1.48 0.00 C02

C87 T1‐Story2 k40 Bottom 51.16 1.58 2.35 C02

C87 T1‐Story2 k40 Top 31.49 0.64 0.00 C04

C88 T1‐Story2 k40 Bottom 23.29 7.60 3.36 C02

C88 T1‐Story2 k40 Top 14.26 0.94 0.00 C04

C89 T1‐Story2 k40 Bottom 51.23 7.92 3.34 C02

C89 T1‐Story2 k40 Top 31.50 0.92 0.00 C06

C9 T1‐Story1 k40 Bottom 24.14 7.91 3.35 C02

C9 T1‐Story1 k40 Top 13.20 0.92 0.00 C09

C90 T1‐Story2 k40 Bottom 23.22 7.67 3.40 C02

C90 T1‐Story2 k40 Top 14.25 0.95 0.00 C06

Page 75: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 75/104

Values

Row Labels  Max of  P

  Max of  M 

Major

k40

Bottom   66.60 3.33

Top   65.44 12.40

K40/60

Bottom   74.76 17.05

Top   71.47 19.26

Page 76: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 76/104

TABLE:  Concrete Column Shear Envelope

Label Story Section Location V Major Major Combo

tonf 

C74 T1‐Story2 K40/60 Top 0.94

C74 T1‐Story2 K40/60 Bottom 0.94

C76 T1‐Story2 K40/60 Top 3.36 C12

C76 T1‐Story2 K40/60 Bottom 3.36 C12

C78 T1‐Story2 K40/60 Top 3.28 C14

C78 T1‐Story2 K40/60 Bottom 3.28 C14

C80 T1‐Story2 K40/60 Top 1.42

C80 T1‐Story2 K40/60 Bottom 1.42

C85 T1‐Story2 k40 Top 1.76 C18

C85 T1‐Story2 k40 Bottom 1.76 C18

C86 T1‐Story2 k40 Top 1.76 C18

C86 T1‐Story2 k40 Bottom 1.76 C18

C87 T1‐Story2 k40 Top 2.31 C18

C87 T1‐Story2 k40 Bottom 2.31

C88 T1‐Story2 k40 Top 2.60 C18

C88 T1‐Story2 k40 Bottom 2.60 C18

C89 T1‐Story2 k40 Top 2.30 C18

C89 T1‐Story2 k40 Bottom 2.30

C90 T1‐Story2 k40 Top 2.60 C18

C90 T1‐Story2 k40 Bottom 2.60 C18

C10 T1‐Story1 k40 Top 9.97 C18

C10 T1‐Story1 k40 Bottom 9.97 C18

C11 T1‐Story1 k40 Top 5.63 C18

C11 T1‐Story1 k40 Bottom 5.63 C18

C12 T1‐Story1 k40 Top 2.89 C04

C12 T1‐Story1 k40 Bottom 2.89 C04

C13 T1‐Story1 k40 Top 3.54 C04

C13 T1‐Story1 k40 Bottom 3.54 C04

C14 T1‐Story1 k40 Top 4.06 C04

C14 T1‐Story1 k40 Bottom 4.06 C04

C15 T1‐Story1 k40 Top 4.54 C04

C15 T1‐Story1 k40 Bottom 4.54 C04

C16 T1‐Story1 k40 Top 4.96 C04

C16 T1‐Story1 k40 Bottom 4.96 C04

C17 T1‐Story1 k40 Top 8.64 C17

C17 T1‐Story1 k40 Bottom 8.64 C17

C19 T1‐Story1 k40 Top 1.82 C18

C19 T1‐Story1 k40 Bottom 1.82 C18

C20 T1‐Story1 K40/60 Top 0.83 C18

C20 T1‐Story1 K40/60 Bottom 0.83 C18

C22 T1‐Story1 K40/60 Top 2.43 C14

C22 T1‐Story1 K40/60 Bottom 2.43 C14

C23 T1‐Story1 K40/60 Top 2.71 C14

C23 T1‐Story1 K40/60 Bottom 2.71 C14

C24 T1‐Story1 K40/60 Top 3.01 C14

C24 T1‐Story1 K40/60 Bottom 3.01 C14

C26 T1‐Story1 K40/60 Top 6.90 C12

Page 77: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 77/104

C26 T1‐Story1 K40/60 Bottom 6.90 C12

C28 T1‐Story1 K40/60 Top 3.78 C18

C28 T1‐Story1 K40/60 Bottom 3.78 C18

C29 T1‐Story1 K40/60 Top 0.87 C18

C29 T1‐Story1 K40/60 Bottom 0.87 C18

C31 T1‐Story1 K40/60 Top 2.58 C11

C31 T1‐Story1 K40/60 Bottom 2.58 C11

C32 T1‐Story1 K40/60 Top 2.82 C12

C32 T1‐Story1 K40/60 Bottom 2.82 C12

C33 T1‐Story1 K40/60 Top 3.11 C12

C33 T1‐Story1 K40/60 Bottom 3.11 C12

C35 T1‐Story1 K40/60 Top 6.65 C14

C35 T1‐Story1 K40/60 Bottom 6.65 C14

C37 T1‐Story1 k40 Top 5.48 C18

C37 T1‐Story1 k40 Bottom 5.48 C18

C38 T1‐Story1 k40 Top 5.77 C18

C38 T1‐Story1 k40 Bottom 5.77 C18

C39 T1‐Story1 k40 Top 2.95 C06

C39 T1‐Story1 k40 Bottom 2.95 C06

C40 T1‐Story1 k40 Top 3.67 C06

C40 T1‐Story1 k40 Bottom 3.67 C06

C41 T1‐Story1 k40 Top 4.19 C06

C41 T1‐Story1 k40 Bottom 4.19 C06

C42 T1‐Story1 k40 Top 4.68 C06

C42 T1‐Story1 k40 Bottom 4.68 C06

C43 T1‐Story1 k40 Top 5.09 C06

C43 T1‐Story1 k40 Bottom 5.09 C06

C44 T1‐Story1 k40 Top 7.10 C18

C44 T1‐Story1 k40 Bottom 7.10 C18

C46 T1‐Story1 k40 Top 7.49 C18

C46 T1‐Story1 k40 Bottom 7.49 C18

C48 T1‐Story1 k40 Top 8.25 C18

C48 T1‐Story1 k40 Bottom 8.25 C18

C50 T1‐Story1 k40 Top 8.22 C18

C50 T1‐Story1 k40 Bottom 8.22 C18

C52 T1‐Story1 k40 Top 7.42 C18

C52 T1‐Story1 k40 Bottom 7.42 C18

C66 T1‐Story1 k40 Top 9.79 C18

C66 T1‐Story1 k40 Bottom 9.79 C18

C68 T1‐Story1 k40 Top 3.76

C68 T1‐Story1 k40 Bottom 3.76

C70 T1‐Story1 k40 Top 3.80

C70 T1‐Story1 k40 Bottom 3.80

C72 T1‐Story1 k40 Top 8.37 C18

C72 T1‐Story1 k40 Bottom 8.37 C18

C81 T1‐Story1 k40 Top 8.07 C18

C81 T1‐Story1 k40 Bottom 8.07 C18

C82 T1‐Story1 k40 Top 7.44 C18

C82 T1‐Story1 k40 Bottom 7.44 C18

C83 T1‐Story1 k40 Top 7.41 C18

Page 78: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 78/104

C83 T1‐Story1 k40 Bottom 7.41 C18

C84 T1‐Story1 k40 Top 7.80 C18

C84 T1‐Story1 k40 Bottom 7.80 C18

Page 79: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 79/104

Values

Row Labels Max of  V Major Max of  V Minor

k40 9.97 9.29

K40/60 6.9 4.69

Page 80: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 80/104

COLUMN CONCRETE DESIGNINPUT DATA

Pembesian

Tumpuan  AB

MAB   =   12.40  TM   Kesimpulan  :

NA   =   65.44  T   Dimensi kolom   40   x   40   cm

D =   9.97  T   Tulangan utama 8 D   16

L =   3  M (Lk)   Sengkang d 10   ‐   150

Check conditon = …………….ok 

K =   250   →   n =   20 kg/cm² (PBI, hal. 132)U =   39   →   σa   =   2250 kg/cm² (PBI, hal. 103)

Ø utama   = 16 mmØ sengkang   =   10  mm

d = 36.9 cm

 b = 40 cm

h = 40 cm

eo1   = M =   12.40   =   0.189   m

 N   65.44

eo2   =   1/30   h =   0.01   m > 0.02

eo = eo1   + eo2

=   0.189   +   0.020

=   0.209   m

eo/ht =   0.524

C =   6.920   dari tabel PBI hal. 113

e1   =   C   x ² x h

100 h

=   6.920   x ² x 0.4

100 0.4

=   0.02   m

e2   =   0.150   h   =   0.15 0.4 = 0.06

e =   eo   +   e1   + e2

=   0.209   +   0.016   + 0.06

=   0.285   m

ea   =   e   + 0.5 ht + d

=   0.285   + 0.5 0.4 + 0.033

=   0.518   m

 N x ea =   6 5. 4 0. 51 8

=   33.902   tm

Ca = d = 36.9

n N ea   20 33901.62

 b   σa   0.4 2250

=   1.344   m

Øo =

n   σ b   →   σ b  = PBI hal.105

=   1.250

20 90

δ   = 1 -   ⅞   h/ea

= 1 - 0.6232

= 0 .3768   →   0.30   600   3.00   4

ca   =   1.344   dan   δ   =   0.40   1344

dari tabel lentur "n" diperoleh :

Lk

3

σa

2250

Page 81: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 81/104

ξ   =   0.650

Ø =   2.922   > Øo =   1.250 …………….ok 

100 nw =   8.28

ea/h   =   1.40

i =

1   -   ξ   h/ea

=

1   -   0.650 0.71 1   -   0.885 0.71

= 1.8621

Reinforcement

i A = w b d

= 40 36.9

100   20

A = 6.113

1.862

A = 3.28 cm²

TULANGAN TARIK   = 2   Ø   16

A' =   δ   i   A=   0.40 1.86 3.28

=   2.45 cm²

TULANGAN TEKAN   =   2 Ø   16

A tot   = 4   Ø   16

= 6 cm² ………… (1)

1

1 1

8.283

Cek Tulangan minimum

A min   = 1% b d

= 0.01 40 40

= 16 cm² ………… (2)

Tul. Total = A + A' > A min

=   5.73   < 16   →   no ok 

A pakai = 16 cm²

= 8   Ø   16

TULANGAN GESER

D = 9970 kg

τ b   = = 9970

 b z 40   ⅞   36.9

= 7.72 kg/cm² <   τ b izin   = 8 kg/cm²

τ b   = As   σau   σau   = 3390 kg/cm²

s b (PBI, hal.106)

Ø sengk = 10 mm

s = As   σau

τ b   b   τ b = Pengurangan tegangan izin dengan tegangan yang terjadi

= 1.5708 3390

7.72   40

= 17.245 cm < s min = 15 cm

S pakai = 15 cm = 150 cm

D

Page 82: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 82/104

COLUMN CONCRETE DESIGNINPUT DATA

Pembesian

Tumpuan  AB

MAB   =   19.26  TM   Kesimpulan  :

NA   =   71.47  T   Dimensi kolom   40   x   60   cm

D =   9.97  T   Tulangan utama 12 D   16

L =   4  M (Lk)   Sengkang d 10   ‐   150

Check conditon = …………….ok 

K =   250   →   n =   20 kg/cm² (PBI, hal. 132)U =   39   →   σa   =   2250 kg/cm² (PBI, hal. 103)

Ø utama   = 16 mmØ sengkang   =   10  mm

d = 56.9 cm

 b = 40 cm

h = 60 cm

eo1   = M =   19.26   =   0.269   m

 N   71.47

eo2   =   1/30   h =   0.02   m > 0.02

eo = eo1   + eo2

=   0.269   +   0.020

=   0.289   m

eo/ht =   0.482

C =   6.890   dari tabel PBI hal. 113

e1   =   C   x ² x h

100 h

=   6.890   x ² x 0.6

100 0.6

=   0.02   m

e2   =   0.150   h   =   0.15 0.6 = 0.09

e =   eo   +   e1   + e2

=   0.289   +   0.018   + 0.09

=   0.398   m

ea   =   e   + 0.5 ht + d

=   0.398   + 0.5 0.6 + 0.033

=   0.731   m

 N x ea =   7 1. 5 0. 73 1

=   52.234   tm

Ca = d = 56.9

n N ea   20 52234.35

 b   σa   0.4 2250

=   1.670   m

Øo =

n   σ b   →   σ b  = PBI hal.105

=   1.250

20 90

δ   = 1 -   ⅞   h/ea

= 1 - 0.6812

= 0 .3188   →   0.30   600   3.00   4

ca   =   1.670   dan   δ   =   0.40   1670

dari tabel lentur "n" diperoleh :

Lk

4

σa

2250

Page 83: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 83/104

ξ   =   0.650

Ø =   2.922   > Øo =   1.250 …………….ok 

100 nw =   8.28

ea/h   =   1.28

i =

1   -   ξ   h/ea

=

1   -   0.650 0.78 1   -   0.885 0.78

= 2.0245

Reinforcement

i A = w b d

= 40 56.9

100   20

A = 9.426

2.024

A = 4.66 cm²

TULANGAN TARIK   = 3   Ø   16

A' =   δ   i   A=   0.40 2.02 4.66

=   3.77 cm²

TULANGAN TEKAN   =   2 Ø   16

A tot   = 5   Ø   16

= 8 cm² ………… (1)

1

1 1

8.283

Cek Tulangan minimum

A min   = 1% b d

= 0.01 40 60

= 24 cm² ………… (2)

Tul. Total = A + A' > A min

=   8.43   < 24   →   no ok 

A pakai = 24 cm²

= 12   Ø   16

TULANGAN GESER

D = 9970 kg

τ b   = = 9970

 b z 40   ⅞   56.9

= 5.01 kg/cm² <   τ b izin   = 8 kg/cm²

τ b   = As   σau   σau   = 3390 kg/cm²

s b (PBI, hal.106)

Ø sengk = 10 mm

s = As   σau

τ b   b   τ b = Pengurangan tegangan izin dengan tegangan yang terjadi

= 1.5708 3390

5.01   40

= 26.592 cm < s min = 15 cm

S pakai = 15 cm = 150 cm

D

Page 84: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 84/104

PERHITUNGAN

PONDASI

Standard dan Spesifikasi :

1. Pondasi yang digunakan adalah Tiang Pancang 

2. Type Tiang Pancang : Mini Pile

2. Ukuran Pile 25 x 25 cm

3. Working Load : 40 Ton

4. Mutu Beton : K-450

5. System pemancangan : Diesel Hammer or Hydraulick Hammer

6. Kedalaman -min. 6m

6

Page 85: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 85/104

 A B C D E F G H

1

2

3

4

5

6

7

8

9

10

11

4

Fz = 36.67

9

Fz = 17.31

10

Fz = 25.86

11

Fz = 19.87

12

Fz = 25.07

13

Fz = 23.82

14

Fz = 24.14

15

Fz = 23.8

16

Fz = 24.87

17

Fz = 23.56

19

Fz = 9.36

21

Fz = 56.69

22

Fz = 49.88

23

Fz = 49.56

24

Fz = 49.66

25

Fz = 51.94

26

Fz = 25.95

28

Fz = 10.8

30

Fz = 32.59

31

Fz = 56.56

32

Fz = 50.03

33

Fz = 49.88

34

Fz = 49.88

35

Fz = 51.63

36

Fz = 26.27

37

Fz = 17.34

38

Fz = 27.2

39

Fz = 20.73

40

Fz = 24.72

41

Fz = 23.84

42

Fz = 24.01

43

Fz = 23.87

44

Fz = 24.94

45

Fz = 23.2

46

Fz = 18.63

47

Fz = 35.07

48

Fz = 18.84

49

Fz = 51.77

50

Fz = 18.85

51

Fz = 51.83

52

Fz = 18.8

53

Fz = 33.24

57

Fz = 5.74

58

Fz = 4.71

59

Fz = 14.89

60

Fz = 12.37

61

Fz = 14.56

62

Fz = 11.82

63

Fz = 15.98

64

Fz = 12.91

65

Fz = 14.73 66

Fz = 11.92

67

Fz = 16.14

68

Fz = 15.06

106

Fz = 4.67

107

Fz = 5.75

108

Fz = 14.94

109

Fz = 12.37

110

Fz = 14.6

111

Fz = 11.81

112

Fz = 16

113

Fz = 12.89

114

Fz = 14.75115

Fz = 11.9

116

Fz = 15.05

121

Fz = 32.93

228

Fz = 16.32

271

Fz = 19.68

272

Fz = 40.84

273

Fz = 40.96

274

Fz = 17.6

163

Fz = 26.09

342

Fz = 25.51

348

Fz = 25.51

353

Fz = 26.28

365

Fz = 36.67

367

Fz = 38.58

369

Fz = 17.72

371

Fz = 38.63

373

Fz = 17.66

   1   6 .   2

   0   5   (  m   )

   4   (  m   )

   6   (  m   )

   6   (  m   )

   6   (  m   )

   6   (  m   )

   6   (  m   )

   6   (  m

   )

   6   (  m   )

   4   (  m   )

4 (m) 6 (m) 6 (m) 6 (m) 6 (m) 6 (m) 4 (m)

X

Y

ETABS 2015 15.0.0

Page 86: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 86/104

INPUT 

MATERIAL

Kuat tekan beton, f  c' =   20.75   MPa

Kuat leleh baja tulangan deform   ( Ø  > 12 mm ),   f y  =   400   MPa

Kuat leleh baja tulangan polos ( Ø  ≤ 12 mm ),   f y  =   240   MPa

Berat beton bertulang, wc  =   24   kN/m3

P axial pancang =   40   T

INPUT PILE

Ukuran tiang pancang   25   cm

Tebal tanah diatas pile cap   0.6   m

Jarak tiang pancang tepi terhadap sisi luar beton   0.4   m

Jarak antar tiang pancang   0.75   m

Berat beton bertulang,   24.00   kN/m3

Page 87: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 87/104

Daya dukung fondasi :   40   T

Conclusion :

N   P max (T)   M

 (TM) 

P  (T)   Mmax (TM) 

m n E P design

1 19.87 0 17.66 0 1 1   1.00   40

2 56.69 0 0 0 1 2   0.99   39.7

TABLE:  J TABLE:  Joint  Reactions

Story Joint Uniqe Combo FX FY FZ MX MY MZ Jml Tia ng T. Rencana

tonf tonf tonf tonf‐m tonf‐m tonf‐m n nT1‐Base 2 373 FOOTING 0.36 0.25 17.66 0.00 0.00 0.00   0.5 1

T1‐Base 3 371 FOOTING 0.03 0.51 38.63 0.00 0.00 0.00   1.0 2

T1‐Base 4 4 FOOTING 0.00 0.52 36.67 0.00 0.00 0.00   1.0 2

T1‐Base 5 365 FOOTING 0.00 0.52 36.67 0.00 0.00 0.00   1.0 2

T1‐Base 6 367 FOOTING   ‐0.03 0.51 38.58 0.00 0.00 0.00   1.0 2

T1‐Base 7 369 FOOTING   ‐0.36 0.24 17.72 0.00 0.00 0.00   0.5 1

T1‐Base 9 9 FOOTING   ‐0.24 0.76 17.31 0.00 0.00 0.00   0.5 1

T1‐Base 10 10 FOOTING 0.16   ‐0.24 25.86 0.00 0.00 0.00   0.8 2

T1‐Base 11 11 FOOTING   ‐0.52 0.37 19.87 0.00 0.00 0.00   0.5 1

T1‐Base 12 12 FOOTING   ‐1.60   ‐0.03 25.07 0.00 0.00 0.00   0.8 2

T1‐Base 13 13 FOOTING   ‐1.64   ‐0.01 23.82 0.00 0.00 0.00   0.8 2

T1‐Base 14 14 FOOTING   ‐1.63   ‐0.01 24.14 0.00 0.00 0.00   0.8 2

T1‐Base 15 15 FOOTING   ‐1.63   ‐0.02 23.80 0.00 0.00 0.00   0.8 2

T1‐Base 16 16 FOOTING   ‐1.61   ‐0.02 24.87 0.00 0.00 0.00   0.8 2

T1‐Base 17 17 FOOTING   ‐0.68   ‐0.70 23.56 0.00 0.00 0.00   0.8 2

T1‐Base 19 19 FOOTING

  ‐0.88 0.91 9.36 0.00 0.00 0.00   0.3 1

T1‐Base 20 121 FOOTING   ‐0.43   ‐0.98 32.93 0.00 0.00 0.00   1.0 2

T1‐Base 21 21 FOOTING 2.02   ‐0.03 56.69 0.00 0.00 0.00   1.5 2

T1‐Base 22 22 FOOTING 2.02   ‐0.01 49.88 0.00 0.00 0.00   1.3 2

T1‐Base 23 23 FOOTING 2.00 0.00 49.56 0.00 0.00 0.00   1.3 2

T1‐Base 24 24 FOOTING 2.01 0.00 49.66 0.00 0.00 0.00   1.3 2

T1‐Base 25 25 FOOTING 1.99 0.06 51.94 0.00 0.00 0.00   1.5 2

T1‐Base 26 26 FOOTING   ‐0.24   ‐0.76 25.95 0.00 0.00 0.00   0.8 2

T1‐Base 28 28 FOOTING 1.50 1.14 10.80 0.00 0.00 0.00   0.5 1

T1‐Base 29 30 FOOTING 0.42   ‐0.94 32.59 0.00 0.00 0.00   1.0 2

T1‐Base 30 31 FOOTING   ‐2.11   ‐0.06 56.56 0.00 0.00 0.00   1.5 2

T1‐Base 31 32 FOOTING   ‐2.20 0.00 50.03 0.00 0.00 0.00   1.5 2

T1‐Base 32 33 FOOTING   ‐2.18 0.00 49.88 0.00 0.00 0.00   1.3 2

T1‐Base 33 34 FOOTING   ‐2.19   ‐0.01 49.88 0.00 0.00 0.00   1.3 2

T1‐Base 34 35 FOOTING   ‐2.14 0.07 51.63 0.00 0.00 0.00   1.5 2

T1‐Base 35 36 FOOTING 0.24

  ‐0.76 26.27 0.00 0.00 0.00   0.8 2

T1‐Base 36 37 FOOTING 0.22 0.77 17.34 0.00 0.00 0.00   0.5 1

T1‐Base 37 38 FOOTING   ‐0.09   ‐0.20 27.20 0.00 0.00 0.00   0.8 2

T1‐Base 38 39 FOOTING 0.55 0.11 20.73 0.00 0.00 0.00   0.8 2

T1‐Base 39 40 FOOTING 1.67   ‐0.02 24.72 0.00 0.00 0.00   0.8 2

T1‐Base 40 41 FOOTING 1.79 0.00 23.84 0.00 0.00 0.00   0.8 2

T1‐Base 41 42 FOOTING 1.79 0.00 24.01 0.00 0.00 0.00   0.8 2

T1‐Base 42 43 FOOTING 1.79   ‐0.01 23.87 0.00 0.00 0.00   0.8 2

T1‐Base 43 44 FOOTING 1.75   ‐0.02 24.94 0.00 0.00 0.00   0.8 2

T1‐Base 44 45 FOOTING 0.75   ‐0.72 23.20 0.00 0.00 0.00   0.8 2

T1‐Base 45 46 FOOTING   ‐0.07 1.01 18.63 0.00 0.00 0.00   0.5 1

T1‐Base 46 47 FOOTING 0.41   ‐0.38 35.07 0.00 0.00 0.00   1.0 2

T1‐Base 47 48 FOOTING 0.00 1.08 18.84 0.00 0.00 0.00   0.5 1

T1‐Base 48 49 FOOTING   ‐0.27   ‐0.62 51.77 0.00 0.00 0.00   1.5 2

T1‐Base 49 50 FOOTING   ‐0.02 1.07 18.85 0.00 0.00 0.00   0.5 1

T1‐Base 50 51 FOOTING 0.24   ‐0.63 51.83 0.00 0.00 0.00   1.5 2

T1‐Base 51 52 FOOTING 0.05 1.03 18.80 0.00 0.00 0.00   0.5 1

T1‐Base 52 53 FOOTING   ‐0.43   ‐0.53 33.24 0.00 0.00 0.00   1.0 2

T1‐Base 163 57 FOOTING   ‐1.32 0.24 5.74 0.00 0.00 0.00   0.3 1

T1‐Base 164 58 FOOTING   ‐3.99   ‐0.53 4.71 0.00 0.00 0.00   0.3 1

T1‐Base 60 59 FOOTING 0.39 0.11 14.89 0.00 0.00 0.00   0.5 1

T1‐Base 61 60 FOOTING   ‐0.16 0.18 12.37 0.00 0.00 0.00   0.5 1

T1‐Base 62 61 FOOTING 0.46 0.68 14.56 0.00 0.00 0.00   0.5 1

T1‐Base 63 62 FOOTING   ‐0.35 0.30 11.82 0.00 0.00 0.00   0.5 1

T1‐Base 64 63 FOOTING 4.02 0.23 15.98 0.00 0.00 0.00   0.5 1

T1‐Base 65 64 FOOTING 1.10   ‐0.21 12.91 0.00 0.00 0.00   0.5 1

T1‐Base 66 65 FOOTING 0.17   ‐0.14 14.73 0.00 0.00 0.00   0.5 1

T1‐Base 67 66 FOOTING   ‐0.12 0.07 11.92 0.00 0.00 0.00   0.5 1

Page 88: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 88/104

TABLE: 

J TABLE: 

Joint  

Reactions

Story Joint Uniqe Combo FX FY FZ MX MY MZ Jml 

Tia ng T. 

Rencana

tonf tonf tonf tonf‐m tonf‐m tonf‐m n n

T1‐Base 68 67 FOOTING 0.38 0.02 16.14 0.00 0.00 0.00   0.5 1

T1‐Base 69 68 FOOTING 0.28 0.29 15.06 0.00 0.00 0.00   0.5 1

T1‐Base 59 108 FOOTING   ‐0.43 0.15 14.94 0.00 0.00 0.00   0.5 1

T1‐Base 71 109 FOOTING 0.12 0.19 12.37 0.00 0.00 0.00   0.5 1

T1‐Base 73 110 FOOTING   ‐0.48 0.75 14.60 0.00 0.00 0.00   0.5 1

T1‐Base 75 111 FOOTING 0.30 0.31 11.81 0.00 0.00 0.00   0.5 1

T1‐Base 77 112 FOOTING   ‐3.98 0.29 16.00 0.00 0.00 0.00   0.5 1

T1‐Base 79 113 FOOTING   ‐1.16   ‐0.21 12.89 0.00 0.00 0.00   0.5 1

T1‐Base 81 114 FOOTING   ‐0.21   ‐0.13 14.75 0.00 0.00 0.00   0.5 1

T1‐Base 83 115 FOOTING 0.09 0.07 11.90 0.00 0.00 0.00   0.5 1

T1‐Base 85 228 FOOTING   ‐0.46 0.04 16.32 0.00 0.00 0.00   0.5 1

T1‐Base 87 116 FOOTING   ‐0.31 0.29 15.05 0.00 0.00 0.00   0.5 1

T1‐Base 113 106 FOOTING 3.77   ‐0.58 4.67 0.00 0.00 0.00   0.3 1

T1‐Base 114 107 FOOTING 1.47 0.17 5.75 0.00 0.00 0.00   0.3 1

T1‐Base 115 271 FOOTING 0.20   ‐0.48 19.68 0.00 0.00 0.00   0.5 1

T1‐Base 122 272 FOOTING 0.05   ‐0.25 40.84 0.00 0.00 0.00   1.3 2

T1‐Base 165 273 FOOTING   ‐0.06   ‐0.24 40.96 0.00 0.00 0.00   1.3 2

T1‐Base 172 274 FOOTING   ‐0.38   ‐0.01 17.60 0.00 0.00 0.00   0.5 1

T1‐Base 272 163 FOOTING 0.04   ‐1.18 26.09 0.00 0.00 0.00   0.8 2

T1‐Base 273 342 FOOTING 0.02   ‐1.18 25.51 0.00 0.00 0.00   0.8 2

T1‐Base 274 348 FOOTING   ‐0.02   ‐1.18 25.51 0.00 0.00 0.00   0.8 2

T1‐Base 275 353 FOOTING

  ‐0.03

  ‐1.19 26.28 0.00 0.00 0.00   0.8 2

Page 89: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 89/104

KODE FONDASI : F1

Kesimpulan : Dimensi 0.8 x 0.8 x 0.4 M

Tul. Utama D13-170

Tul. Bagi D13-200

DATA BAHAN PILECAPKuat tekan beton, f c' =   20.75 MPa

  ,y   a

Kuat leleh baja tulangan polos ( ≤ 12 mm ), f y  =   240 MPa

Berat beton bertulang, wc  =   24 kN/m3

DATA DIMENSI FONDASI

Lebar kolom arah x, bx =   0.40 m

=  , y  .

Tebal pilecap, h =   0.40 m

Jarak tiang pancang tepi terhadap sisi luar beton, a =   0.40 m

Tebal tanah di atas pilecap, z =   0.60 m

Berat volume tanah di atas pilecap, ws =   18.00 kN/m

Posisi kolom (dalam = 40, tepi = 30, sudut = 20)   s =   40

DATA BEBAN FONDASI

Gaya aksial kolom akibat beban terfaktor, Puk =   17.66   T

  . ux  .

Momen arah y akibat beban terfaktor. Muy =   0.00   TM

Gaya lateral arah x akibat beban terfaktor, Hux =   0.00   T

Gaya lateral arah y akibat beban terfaktor, Huy =   0.00   T

Tahanan aksial tiang pancang,   * Pn =   40.00   T

Page 90: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 90/104

Tahanan lateral tiang pancang,   * Hn =   0.00 kN

DATA SUSUNAN TIANG PANCANG

Susunan tiang pancang arah x : Susunan tiang pancang arah y :

No. Jumlah x n * x2

No. Jumlah y n * y2

n (m) (m2) n (m) (m

2)

1 0 0.00 0.00 1 0 0.00 0.00

2 1 0.00 0.00 2 1 0.00 0.00

3 0 0.00 0.00 3 0 0.00 0.00

 = 1   x2 = 0.00 n = 1   y

2 = 0.00

Lebar pilecap arah x, Lx = 0.80 m

Lebar pilecap arah y, Ly = 0.80 m

.

Berat tanah di atas pilecap, Ws = Lx * Ly * z * ws = 6.91 kN

Berat pilecap, Wc = Lx * Ly * h * wc = 6.14 kN

Total gaya aksial terfaktor, Pu = Puk + 1.2 * Ws + 1.2 * Wc = 192.27 kN

Lengan maksimum tiang pancang arah x thd. pusat, xmax = 0.00 m

Lengan maksimum tiang pancang arah y thd. pusat, ymax = 0.00 m

Lengan minimum tiang pancang arah x thd. pusat, xmin = 0.00 m

Lengan minimum tiang pancang arah y thd. pusat, ymin = 0.00 m

Gaya aksial maksimum dan minimum pada tiang pancang,

pumax  = Pu / n + Mux* xmax / x + Muy* ymax / y = 192.27 kNpumin  = Pu / n + Mux* xmin / x + Muy* ymin / y = 192.27 kN

Syarat : pumax   ≤   * Pn

192.27 < 400.00   →  AMAN (OK)

2. GAYA LATERAL PADA TIANG PANCANG

Gaya lateral arah x pada tiang, hux  = Hux / n = 0.00 kN

Gaya lateral arah y pada tiang, huy  = Huy / n = 0.00 kN

Gaya lateral kombinasi dua arah, humax = ( hux   + huy  ) = 0.00 kN

Syarat : humax   ≤   * Hn

. .  

Page 91: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 91/104

3. TINJAUAN GESER ARAH X

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.100 m

Tebal efektif ileca d = h - d' = 0.300 m

Jarak bid. kritis terhadap sisi luar, cx = ( Lx - bx - d ) / 2 = 0.050 m

Berat beton, W1 = cx * Ly * h * wc = 0.384 kN

Berat tanah, W2 = cx * Ly * z * ws = 0.432 kN

Gaya geser arah x, Vux = pumax - W1 - W2 = 191.4512 kN

Lebar bidang geser untuk tinjauan arah x, b = Ly = 800 mmTebal efektif pilecap, d = 300 mm

Rasio sisi panjang thd. sisi pendek kolom,   c = bx / by = 1.0000

Kuat geser pilecap arah x, diambil nilai terkecil dari Vc yang diperoleh dari pers.sbb. :

Vc = [ 1 + 2 / c ] * √ f c' * b * d / 6 * 10-

 = 546.626 kN

Vc = [ s * d / b + 2 ] * √ f c' * b * d / 12 * 10-

 = 1548.774 kN-

c = c   = . 7

Diambil, kuat geser pilecap,   Vc = 364.417 kN

Faktor reduksi kekuatan geser,   = 0.75

Kuat geser pilecap,   Vc = 273.313 kN

Syarat yang harus dipenuhi,

  c ux

273.313 > 191.451    AMAN (OK)

Page 92: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 92/104

4. TINJAUAN GESER ARAH Y

Jarak usat tulan an terhada sisi luar beton d' = 0.100 m

Tebal efektif pilecap, d = h - d' = 0.300 m

Jarak bid. kritis terhadap sisi luar, cy = ( Ly - by - d ) / 2 = 0.050 m

Berat beton, W1 = cy * Lx * h * wc = 0.384 kN

Berat tanah, W2 = cy * Lx * z * ws = 0.432 kN

Gaya geser arah y, Vuy = pumax - W1 - W2 = 191.4512 kNLebar bidang geser untuk tinjauan arah y, b = Lx = 800 mm

Tebal efektif pilecap, d = 300 mm

Rasio sisi panjang thd. sisi pendek kolom,   c = bx / by = 1.0000

Kuat geser pilecap arah y, diambil nilai terkecil dari Vc yang diperoleh dari pers.sbb. :

Vc = [ 1 + 2 / c ] * √ f c' * b * d / 6 * 10-

 = 546.626 kN-

c = s  + c   = 5 .77

Vc = 1 / 3 * √ f c' * b * d * 10-

 = 364.417 kN

Diambil, kuat geser pilecap,   Vc = 364.417 kN

Faktor reduksi kekuatan geser,   = 0.75

Kuat geser pilecap,   Vc = 273.313 kN

  ,

Vc   ≥ Vux

273.313 > 191.451    AMAN (OK)

Page 93: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 93/104

5. TINJAUAN GESER DUA ARAH (PONS)

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.100 m

Tebal efektif pilecap, d = h - d' = 0.300 m

Lebar bidang geser pons arah x, Bx = bx + d = 0.700 m

Lebar bidang geser pons arah y, By = by + d = 0.700 mGaya geser pons akibat beban terfaktor pada kolom, Puk = 176.600 kN

Luas bidang geser pons,  Ap = 2 * ( Bx + By ) * d = 0.840 m

Lebar bidang geser pons, bp = 2 * ( Bx + By ) = 2.800 m

Rasio sisi panjang thd. sisi pendek kolom,   c = bx / by = 1.0000

Tegangan geser pons, diambil nilai terkecil dari f p  yang diperoleh dari pers.sbb. :

p = + c   c   = . 7 a

f p = [ s * d / bp + 2 ] * √ f c' / 12 = 2.386 MPa

f p = 1 / 3 * √ f c' = 1.518 MPa

Tegangan geser pons yang disyaratkan, f p = 1.518 MPa

Faktor reduksi kekuatan geser pons,     = 0.75

 *   * * *  ,   np   p   p   .

Syarat :    * Vnp   ≥ Puk

956.596 > 176.600    AMAN (OK)

Page 94: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 94/104

6. PEMBESIAN PILECAP

6.1. TULANGAN LENTUR ARAH X

Jarak tepi kolom terhadap sisi luar pilecap, cx = ( Lx - bx ) / 2 = 0.200 m

Jarak tiang thd. sisi kolom, ex = cx - a = -0.200 m

Berat beton, W1 = cx * Ly * h * wc = 1.536 kN

Berat tanah, W2 = cx * Ly * z * ws = 1.728 kNMomen yang terjadi pada pilecap,

Mux = 3 * pumax * ex - W1 * cx / 2 - W2 * cx / 2 = -115.687 kNm

Lebar pilecap yang ditinjau, b = Ly = 800 mm

Tebal pilecap, h = 400 mm

Jarak pusat tulangan thd. sisi luar beton, d' = 100 mm

Tebal efektif plat, d = h - d' = 300 mm

Kuat tekan beton, f c' = 21 MPa

Kuat leleh baja tulangan, f y = 400 MPa

Modulus elastis baja, Es = 2.00E+05 MPa

Faktor distribusi teg. beton, 1 = 0.85

* * ’ *b  1   . c   y   y   .

Faktor reduksi kekuatan lentur,   = 0.80

Rmax = 0.75 * b * f y * [1-½*0.75* b * f y / ( 0.85 * f c’ ) ] = 5.456

Mn = Mux /   = -144.608 kNm

Rn = Mn * 10 / ( b * d ) = -2.00845

Page 95: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 95/104

Rn < Rmax   (OK)

Page 96: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 96/104

Rasio tulangan yang diperlukan,

 = 0.85 * f c’ / f y * [ 1 -  {1 – 2 * Rn / ( 0.85 * f c’ ) } ] = -0.0048

Rasio tulangan minimum,   min = 0.0025

Rasio tulangan yang digunakan,  

= 0.0025

Luas tulangan yang diperlukan,  As = * b * d = 600.00 mm

Diameter tulangan yang digunakan, D 13 mmJarak tulangan yang diperlukan,   s =  / 4 * D * b / As = 177 mm

ara u angan ma s mum, max  mm

Jarak tulangan yang digunakan,   s = 177 mm

Digunakan tulangan, D 13 - 170

Luas tulangan terpakai,   As =  / 4 * D * b / s = 624.62 mm2

. .

Jarak tepi kolom terhadap sisi luar pilecap, cy = ( Ly - by ) / 2 = 0.200 m

ara t ang t . s s o om, ey = cy - a = - . m

Berat beton, W1 = cy * Lx * h * wc = 1.536 kN

Berat tanah, W2 = cy * Lx * z * ws = 1.728 kN

Momen yang terjadi pada pilecap,

Muy = 3 * pumax * ey - W1 * cy / 2 - W2 * cy / 2 = -115.687 kNm

  ,   x 

Tebal pilecap, h = 400 mm

Jarak pusat tulangan thd. sisi luar beton, d' = 100 mm

Tebal efektif plat, d = h - d' = 300 mm

Kuat tekan beton, f c' = 21 MPa

Page 97: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 97/104

Kuat leleh baja tulangan, f y = 400 MPa

Modulus elastis baja, Es = 2.00E+05 MPa

Faktor distribusi teg. beton, 1 = 0.85

b = 1* 0.85 * f c’/ f y * 600 / ( 600 + f y ) = 0.02248781

Faktor reduksi kekuatan lentur,   = 0.80

Rmax = 0.75 * b * f y * [1-½*0.75* b * f y / ( 0.85 * f c’ ) ] = 5.456Mn = Muy /   = -144.608 kNm

* * 

n   n - .

Rn < Rmax   (OK)

Rasio tulangan yang diperlukan,

 = 0.85 * f c’ / f y * [ 1 -  {1 – 2 * Rn / ( 0.85 * f c’ ) } ] = -0.0048

Rasio tulangan minimum,   min = 0.0025

 

=  ,   .

Luas tulangan yang diperlukan,  As = * b * d = 600.00 mm

Diameter tulangan yang digunakan, D 13 mm

Jarak tulangan yang diperlukan,   s =  / 4 * D * b / As = 177 mm

Jarak tulangan maksimum, smax = 200 mm

Jarak tulangan yang digunakan,   s = 177 mm

Digunakan tulangan, D 13 - 170

Luas tulangan terpakai,   As =  / 4 * D * b / s = 624.62 mm2

3. TULANGAN SUSUT

Rasio tulangan susut minimum,   smin = 0.0014

Luas tulangan susut arah x,   Asx = smin* b * d = 336 mm

Luas tulangan susut arah y,   Asy = smin* b * d = 336 mm

Diameter tulangan yang digunakan, 

13 mm

Jarak tulangan susut arah x,   sx =  / 4 *  * b / Asx = 316 mm

ara tu angan susut ma s mum ara x, sx,max = mm

Jarak tulangan susut arah x yang digunakan,   sx = 200 mm

Jarak tulangan susut arah y,   sy =  / 4 *  * b / Asy = 316 mm

Jarak tulangan susut maksimum arah y, sy,max = 200 mm

Jarak tulangan susut arah y yang digunakan,   sy = 200 mm

  , -

Digunakan tulangan susut arah y,   13 - 200

Page 98: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 98/104

  PERHITUNGAN KEKUATAN FONDASI

KODE FONDASI : F2

Kesimpulan : Dimensi 1.55 x 0.8 x 0.5 M

Tul. Utama D13-120

Tul. Bagi D13-200

DATA BAHAN PILECAP

Kuat tekan beton, f c' =   20.75 MPa

Kuat leleh baja tulangan deform  ( > 12 mm ), f y  =   400 MPa

Kuat leleh baja tulangan polos ( ≤ 12 mm ), f y  =   240 MPa3

Berat beton bertulang, wc  =   24 m

DATA DIMENSI FONDASILebar kolom arah x, bx =   0.40 m

Lebar kolom arah y, by =   0.40 m

Tebal pilecap, h =   0.50 m

ara ang pancang ep er a ap s s uar e on,   . m

Tebal tanah di atas pilecap, z =   0.60 m

Berat volume tanah di atas pilecap, ws =   18.00 kN/m3

Posisi kolom (dalam = 40, tepi = 30, sudut = 20)  s =   40

DATA BEBAN FONDASI

Gaya aksial kolom akibat beban terfaktor, Puk =   56.69 T

Momen arah x akibat beban terfaktor. Mux =   0.0 TM

Momen arah y akibat beban terfaktor. Muy =   0.00 TM

Gaya lateral arah x akibat beban terfaktor, Hux =   0.00 T

Gaya lateral arah y akibat beban terfaktor, Huy =   0.00 T

Page 99: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 99/104

Tahanan aksial tiang pancang,   * Pn =   39.66 T

Tahanan lateral tiang pancang,   * Hn =   0.00 T

DATA SUSUNAN TIANG PANCANG

Susunan tiang pancang arah x : Susunan tiang pancang arah y :

No. Jumlah x n * x2

No. Jumlah y n * y2

n (m) (m2) n (m) (m2)

1 1 0.375 0.14 1 1 0.00 0.00

2 1 -0.375 0.14

n = 2   x2 = 0.28 n = 1   y

2 = 0.00

Lebar pilecap arah x, Lx = 1.55 m

Lebar pilecap arah y, Ly = 0.80 m

Page 100: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 100/104

1. GAYA AKSIAL PADA TIANG PANCANG

Berat tanah di atas pilecap, Ws = Lx * Ly * z * ws = 13.39 kN

Berat pilecap, Wc = Lx * Ly * h * wc = 14.88 kN

Total gaya aksial terfaktor, Pu = Puk + 1.2 * Ws + 1.2 * Wc = 600.83 kN

Lengan maksimum tiang pancang arah x thd. pusat, xmax = 0.38 mLengan minimum tiang pancang arah x thd. pusat, xmin = -0.38 m

Gaya aksial maksimum dan minimum pada tiang pancang,

pumax  = Pu / n + Mux* xmax / x = 300.41 kN

pumin  = Pu / n + Mux* xmin / x = 300.41 kN

Syarat : pumax   ≤   * Pn

300.41 < 396.63   →  AMAN (OK)

3. TINJAUAN TERHADAP GESER

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.100 m

Tebal efektif pilecap, d = h - d' = 0.400 m

ara . r t s ter a ap s s uar, cx = x - x - = . 75 m

Berat beton, W1 = cx * Ly * h * wc = 3.600 kN

Berat tanah, W2 = cx * Ly * z * ws = 3.240 kN

Gaya geser arah x, Vux = pumax - W1 - W2 = 293.5732 kN

Lebar bidang geser untuk tinjauan arah x, b = Ly = 800 mm

  ,  

Rasio sisi panjang thd. sisi pendek kolom,   c = bx / by = 1.0000

Kuat geser pilecap arah x, diambil nilai terkecil dari Vc yang diperoleh dari pers.sbb. :

Vc = [ 1 + 2 / c ] * √ f c' * b * d / 6 * 10-

 = 728.835 kN

Vc = [ s * d / b + 2 ] * √ f c' * b * d / 12 * 10-

 = 2672.394 kN

Page 101: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 101/104

Vc = 1 / 3 * √ f c' * b * d * 10-

 = 485.890 kN

Diambil, kuat geser pilecap,   Vc = 485.890 kN

Faktor reduksi kekuatan geser,   = 0.75

Kuat geser pilecap,   Vc = 364.417 kN

Syarat yang harus dipenuhi,

Vc   ≥ Vux

364.417 > #####    AMAN (OK)

Page 102: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 102/104

6. PEMBESIAN PILECAP

= - =  , x   x   x   .

Jarak tiang thd. sisi kolom, ex = cx - a = 0.175 m

Berat beton, W1 = cx * Ly * h * wc = 5.520 kN

Berat tanah, W2 = cx * Ly * z * ws = 4.968 kN

Momen yang terjadi pada pilecap,

Mux = 2 * pumax * ex - W1 * cx / 2 - W2 * cx / 2 = 102.129 kNm

Lebar pilecap yang ditinjau, b = Ly = 800 mm

Tebal pilecap, h = 500 mm

Jarak pusat tulangan thd. sisi luar beton, d' = 100 mm

Tebal efektif plat, d = h - d' = 400 mm

Kuat tekan beton, f c' = 21 MPaKuat leleh baja tulangan, f y = 400 MPa

Modulus elastis baja, Es = 2.00E+05 MPa

Faktor distribusi teg. beton, 1 = 0.85

b = 1* 0.85 * f c’/ f y * 600 / ( 600 + f y ) = 0.0224878

Faktor reduksi kekuatan lentur,   = 0.80

max = . b y  - . b y   . c   = 5. 5

Mn = Mux /   = 127.662 kNm

Rn = Mn * 10 / ( b * d ) = 0.99736

Rn < Rmax 

(OK)

Rasio tulangan yang diperlukan,

* ’ * * * ’  . c   y - – n   . c   .

Rasio tulangan minimum,   min = 0.0025

Rasio tulangan yang digunakan,  

= 0.0026

Luas tulangan yang diperlukan,  As = * b * d = 821.82 mm

Diameter tulangan yang digunakan, D 13 mm

Page 103: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 103/104

Jarak tulangan yang diperlukan,   s =  / 4 * D * b / As = 129 mm

Jarak tulangan maksimum, smax = 200 mm

Jarak tulangan yang digunakan,   s = 129 mm

Digunakan tulangan, D 13 - 120

Luas tulangan terpakai,   As =  / 4 * D * b / s = 884.88 mm

Tulangan bagi diambil 50% tulangan pokok,  Asb = 50% * As = 442.44 mmJarak tulangan bagi yang diperlukan,   s =  / 4 * D * b / Asb = 240 mm

ara u angan ma s mum, max   mm

Jarak tulangan yang digunakan,   s = 200 mm

Digunakan tulangan, D 13 - 200

Luas tulangan terpakai,   As =  / 4 * D * b / s = 530.93 mm2

Page 104: (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

7/21/2019 (LPS-2) GOR ACEH BESAR 10 12 2015.pdf

http://slidepdf.com/reader/full/lps-2-gor-aceh-besar-10-12-2015pdf 104/104

3. TULANGAN SUSUT

Rasio tulangan susut minimum,   smin = 0.0014

Luas tulangan susut,   As = smin* b * d = 448 mm

Diameter tulangan yang digunakan,  

13 mm

Jarak tulangan susut,   s =  / 4 *  * b / As = 237 mm

Jarak tulangan susut maksimum, smax = 200 mmJarak tulangan susut arah x yang digunakan,  

s = 200 mm

Digunakan tulangan susut arah x, -