Sheet1SATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGLAPORAN KEGIATAN HARIANNAMA KEGIATAN : PEMBUATAN JEMBATAN BETON SEUEBOK ACEH 12X 4M KEC.BENDAHARAHari/Tanggal:./.(Hari ke.)PELAKSANA:CV FAJAR UTAMAA. KEGIATANNOKODEJENIS KEGIATANVOLUMEKETERANGAN1234B. PEMAKAIAN PERALATANNOJENISLOKASIJUMLAHKETERANGAN12345C. CUACANOKEADAAN CUACAKETERANGAN123D. DAFTAR HADIR PERSONILE. MUTASI / KEDATANGAN ALAT DAN BAHANNOTUGAS/JABATANJUMLAHLOKASINOJENIS BAHAN/ALATKETERANGAN123456DiperiksaDibuatPengawas LapanganPelaksana KegiatanMAHYUDDINAHMADINip. 390 017 485Direktur

SepSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 01 (Satu)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DSEPTEMBERPeriode200703 - 09 SeptemberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencRealSisa1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.00.00.254.090.254.0910025753.1(1)Galian BiasaM312.0027,156.04325,872.470.2090.00.00.00.00.00.010001003.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2460.00.00.00.00.00.010001003.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010001005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010001005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010001006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010001006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010001007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.010001007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7840.00.00.00.00.00.010001007.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9570.00.00.00.00.00.010001007.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010001007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.010001007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5880.00.00.00.00.00.010001007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000100Jumlah155,671,056.11100.000.00.00.04.090.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI4.086%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI1.220%Dibulatkan171,238,000.00DEVIASI2.866%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 02 (Dua)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DSEPTEMBERPeriode200710 - 16 SeptemberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencRealSisa1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.2504.0860.00.00.2504.08610001003.1(1)Galian BiasaM312.0027,156.04325,872.470.2090.00.00.00.00.00.010001003.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2460.00.00.00.00.00.010001003.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010001005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010001005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010001006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010001006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010001007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.010001007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7840.00.00.00.00.00.010001007.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9570.00.00.00.00.00.010001007.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010001007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.010001007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5880.00.00.00.00.00.010001007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000100Jumlah155,671,056.11100.000.04.0860.00.00.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI4.086%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI3.890%Dibulatkan171,238,000.00DEVIASI0.196%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 03 (Tiga)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DSEPTEMBERPeriode200717 - 23 SeptemberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencRealSisa1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.2504.0860.2504.0860.5008.17310025753.1(1)Galian BiasaM312.0027,156.04325,872.470.2090.00.00.00.00.00.010001003.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2460.00.00.00.00.00.010001003.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010001005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010001005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010001006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010001006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010001007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.010001007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7840.00.00.00.00.00.010001007.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9570.00.00.00.00.00.010001007.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010001007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.010001007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5880.00.00.00.00.00.010001007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000100Jumlah155,671,056.11100.000.04.0860.04.0860.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI8.173%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI3.890%Dibulatkan171,238,000.00DEVIASI4.283%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 04 (Empat)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DSEPTEMBERPeriode200724 - 30 SeptemberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencRealSisa1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.5008.1730.00.00.5008.17310001003.1(1)Galian BiasaM312.0027,156.04325,872.470.2090.00.03.0000.0523.0000.05210025753.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2460.00.00.00.00.00.010001003.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010001005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010001005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010001006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010001006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010001007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.010001007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7840.00.00.00.00.00.010001007.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9570.00.00.00.00.00.010001007.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010001007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.010001007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5880.00.00.00.00.00.010001007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000100Jumlah155,671,056.11100.000.08.1730.00.0520.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI8.225%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI6.570%Dibulatkan171,238,000.00DEVIASI1.655%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN BULANANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 04 (Empat)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DAGUSTUSPeriode200724 - 30 SeptemberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D BULAN LALUBULAN INIS/D BULAN INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.00.00.5008.1730.5008.1733.1(1)Galian BiasaM312.0027,156.04325,872.470.2090.00.03.0000.0523.0000.0523.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2460.00.00.00.00.00.03.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.05.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.05.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.06.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.06.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.07.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.07.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7840.00.00.00.00.00.07.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9570.00.00.00.00.00.07.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.07.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.07.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5880.00.00.00.00.00.07.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.0Jumlah155,671,056.11100.000.00.00.08.2250.0PPN 10 %15,567,105.61REALISASI S/D BULAN INI8.225%Jumlah Total171,238,161.72RENCANA S/D BULAN INI6.570%Dibulatkan171,238,000.00DEVIASI1.655%Disetujui oleh :Diperiksa oleh :Diajukan oleh :PEJABAT PELAKSANA TEKNIS KEGIATANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSIPRASARANA JEMBATANCV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAADE PUTRA WIJAYA S, STDEDI SUHENDRA,STSYAMSUL BAHRINIP. 400 048 698Site EngineerKuasa Direktur

OktSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 01 (Satu)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DOKTOBERPeriode200701 - 07 OktoberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%0.0RencReal1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.5008.1730.1502.4520.65010.624100153.1(1)Galian BiasaM312.0027,156.04325,872.470.2093.0000.0529.0000.15712.0000.209100753.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2460.00.00.00.00.00.010003.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.010007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7840.00.00.5100.1960.5100.196100257.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9570.00.00.00.00.00.010007.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.010007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5880.00.00.00.00.00.010007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000Jumlah155,671,056.11100.000.08.2250.02.8050.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI11.030%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI9.280%Dibulatkan171,238,000.00DEVIASI1.750%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 02 (Dua)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DOKTOBERPeriode200708 - 14 OktoberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencReal1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.65010.6240.00.00.65010.62410003.1(1)Galian BiasaM312.0027,156.04325,872.470.20912.0000.2090.00.012.0000.20910003.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2460.00.00.00.00.00.010003.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.010007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7840.5100.1961.0200.3921.5300.588100507.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9570.00.0550.3733.196550.3733.196100107.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.010007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5880.00.00.00.00.00.010007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000Jumlah155,671,056.11100.000.011.0300.03.5880.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI14.618%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI12.040%Dibulatkan171,238,000.00DEVIASI2.578%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 03 (Tiga)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DOKTOBERPeriode200715 - 21 OktoberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencReal1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.65010.6240.00.00.65010.62410003.1(1)Galian BiasaM312.0027,156.04325,872.470.20912.0000.2090.00.012.0000.20910003.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2460.00.04.8000.1964.8000.196100803.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.010007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7841.5300.5880.3060.1181.8360.706100157.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.957550.3733.196550.3733.1961,100.7466.391100107.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.010007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5880.00.00.00.00.00.010007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000Jumlah155,671,056.11100.000.014.6180.03.5100.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI18.128%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI16.400%Dibulatkan171,238,000.00DEVIASI1.728%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 04 (Empat)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DOKTOBERPeriode200722 - 28 OktoberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencReal1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.65010.6240.00.00.65010.62410003.1(1)Galian BiasaM312.0027,156.04325,872.470.20912.0000.2090.00.012.0000.20910003.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2464.8000.1960.00.04.8000.19610003.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.010007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7841.8360.7060.00.01.8360.70610007.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9571,100.7466.3911,375.9337.9892,476.67914.381100257.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.010007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5880.00.06.0003.5886.0003.5881001007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000Jumlah155,671,056.11100.000.018.1280.011.5770.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI29.705%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI24.420%Dibulatkan171,238,000.00DEVIASI5.285%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN BULANANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 04 (Empat)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DOKTOBERPeriode200722 - 28 OktoberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D BULAN LALUBULAN INIS/D BULAN INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.5008.1730.1502.4520.65010.6243.1(1)Galian BiasaM312.0027,156.04325,872.470.2093.0000.0529.0000.15712.0000.2093.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2460.00.04.8000.1964.8000.1963.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.05.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.05.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.06.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.06.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.07.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.07.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7840.00.01.8360.7061.8360.7067.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9570.00.02,476.67914.3812,476.67914.3817.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.07.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.07.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5880.00.06.0003.5886.0003.5887.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.0Jumlah155,671,056.11100.000.08.2250.021.4800.0PPN 10 %15,567,105.61REALISASI S/D BULAN INI29.705%Jumlah Total171,238,161.72RENCANA S/D BULAN INI24.420%Dibulatkan171,238,000.00DEVIASI5.285%Disetujui oleh :Diperiksa oleh :Diajukan oleh :PEJABAT PELAKSANA TEKNIS KEGIATANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSIPRASARANA JEMBATANCV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAADE PUTRA WIJAYA S, STDEDI SUHENDRA,STSYAMSUL BAHRINIP. 400 048 698Site EngineerKuasa Direktur

NopSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 01 (Satu)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DNOPEMBERPeriode200729 - 04 NopemberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencReal1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.65010.6240.00.00.65010.62410003.1(1)Galian BiasaM312.0027,156.04325,872.470.20912.0000.2090.00.012.0000.20910003.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2464.8000.1960.00.04.8000.19610003.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.010007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7841.8360.7060.00.01.8360.70610007.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9572,476.67914.3812,751.86515.9795,228.54430.359100507.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.010007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5886.0003.5880.00.06.0003.58810007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000Jumlah155,671,056.11100.000.029.7050.015.980.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI45.683%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI32.310%Dibulatkan171,238,000.00DEVIASI13.373%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 02 (Dua)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DNOPEMBERPeriode200705 - 11 NopemberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencReal1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.65010.6240.00.00.65010.62410003.1(1)Galian BiasaM312.0027,156.04325,872.470.20912.0000.2090.00.012.0000.20910003.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2464.8000.1961.2000.0496.0000.246100203.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.00.00.00.00.010007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7841.8360.7060.1020.0391.9380.74510057.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9575,228.54430.3590.00.05,228.54430.35910007.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.00.00.00.00.010007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5886.0003.5880.00.06.0003.58810007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000Jumlah155,671,056.11100.000.045.6830.00.0880.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI45.772%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI39.450%Dibulatkan171,238,000.00DEVIASI6.322%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 03 (Tiga)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DNOPEMBERPeriode200719 - 25 NopemberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencReal1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.65010.6240.00.00.65010.62410003.1(1)Galian BiasaM312.0027,156.04325,872.470.20912.0000.2090.00.012.0000.20910003.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2466.0000.2460.00.06.0000.24610003.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.032.17615.67232.17615.672100807.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7841.9380.7450.00.01.9380.74510007.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9575,228.54430.3590.00.05,228.54430.35910007.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.00.00.00.00.010007.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.020.8000.88520.8000.8851001007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5886.0003.5880.00.06.0003.58810007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000Jumlah155,671,056.11100.000.045.7720.016.5570.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI62.329%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI52.680%Dibulatkan171,238,000.00DEVIASI9.649%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturSATUAN KERJA DINAS PEKERJAAN UMUM DAERAH KABUPATEN ACEH TAMIANGKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN MINGGUANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 04 (Empat)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DNOPEMBERPeriode200726 - 02 DesemberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D MINGGU LALUMINGGU INIS/D MINGGU INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%RencReal1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.65010.6240.00.00.65010.62410003.1(1)Galian BiasaM312.0027,156.04325,872.470.20912.0000.2090.00.012.0000.20910003.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2466.0000.2460.00.06.0000.24610003.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.010005.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.010005.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.010006.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.010006.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.010007.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.59032.17615.6720.00.032.17615.67210007.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7841.9380.7450.00.01.9380.74510007.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9575,228.54430.3590.00.05,228.54430.35910007.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.014.4004.10314.4004.103100307.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.88520.8000.8850.00.020.8000.88510007.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5886.0003.5880.00.06.0003.58810007.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.01000Jumlah155,671,056.11100.000.062.3290.04.1030.0PPN 10 %15,567,105.61REALISASI S/D MINGGU INI66.432%Jumlah Total171,238,161.72RENCANA S/D MINGGU INI65.700%Dibulatkan171,238,000.00DEVIASI0.732%DIPERIKSA DAN DISETUJUIDI AJUKANPENGAWAS LAPANGANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSICV. RAHMAT SYAHPUTRAAGUS JAILANIDEDI SUHENDRA,STSYAMSUL BAHRINIP. 390 017 484Site EngineerKuasa DirekturKONSULTANPELAKSANADINAS PEKERJAAN UMUMLAPORAN BULANANDAERAH KAB.ACEH TAMIANGBULANMINGGU KE : 04 (Empat)CV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAPROPINSI N.A.DNOPEMBERPeriode200719 - 25 NopemberNAMA KEGIATAN REHAB JEMBATAN BETON POLSEK SEI IYU KEC. BENDAHARAUraian PekerjaanSatVolumeHargaJumlah HargaBobotPROGRESNoKontrakSatuanKontrakS/D BULAN LALUBULAN INIS/D BULAN INIKeteranganItemAwalAwalVolumeBobotVolumeBobotVolumeBobotRpRp%%%%1.2MobilisasiLs1.0025,445,000.0025,445,000.0016.3450.65010.6240.00.00.65010.6243.1(1)Galian BiasaM312.0027,156.04325,872.470.20912.0000.2090.00.012.0000.2093.2(1)Timbunan BiasaM36.0063,707.22382,243.300.2464.8000.1961.2000.0496.0000.2463.2(2)Timbunan PilihanM32.40108,883.86261,321.250.1680.00.00.00.00.00.05.1(1)Lapis Pondasi Aggregat Klas AM315.00289,344.144,340,162.132.7880.00.00.00.00.00.05.2(1)Lapis Pondasi Aggregat Klas CM335.00114,040.863,991,429.952.5640.00.00.00.00.00.06.1(1)Lapis Resap PengikatLtr52.506,221.17326,611.580.2100.00.00.00.00.00.06.3(6a)Laston Lapis Pengikat (AC-BC)M35.251,549,355.878,134,118.305.2250.00.00.00.00.00.07.1(5)Beton Struktur K250M340.22758,245.5530,496,635.9419.5900.00.032.17615.67232.17615.6727.1(7)Beton Cyclop K.175M32.04598,557.721,221,057.750.7841.8360.7060.1020.0391.9380.7457.3(1)Baja Tulangan U24 PolosKg5,503.739,039.0049,748,215.4731.9572,476.67914.3812,751.86515.9795,228.54430.3597.9Pasangan BatuM348.00443,603.4721,292,966.3613.6780.00.014.4004.10314.4004.1037.11(6)Expantion Join Type baja BersudutM'20.8066,200.661,376,973.730.8850.00.020.8000.88520.8000.8857.12(4)Perletakan Elestomer Type 3 (400x450)Bh6.00930,852.985,585,117.883.5886.0003.5880.00.06.0003.5887.13Sandaran JembatanM'40.0068,333.252,733,330.001.7560.00.00.00.00.00.0Jumlah155,671,056.11100.000.029.7050.036.7270.0PPN 10 %15,567,105.61REALISASI S/D BULAN INI66.432%Jumlah Total171,238,161.72RENCANA S/D BULAN INI65.700%Dibulatkan171,238,000.00DEVIASI0.732%Disetujui oleh :Diperiksa oleh :Diajukan oleh :PEJABAT PELAKSANA TEKNIS KEGIATANKONSULTAN SUPERVISIPENYEDIA JASA KONSTRUKSIPRASARANA JEMBATANCV. CITRA BEUTARI KONSULTANCV. RAHMAT SYAHPUTRAADE PUTRA WIJAYA S, STDEDI SUHENDRA,STSYAMSUL BAHRINIP. 400 048 698Site EngineerKuasa Direktur