    : PENAMBAHAN LAMPU PENERANGAN JALAN

    : KABUPATEN PURWOREJO

    : 2016

    HARGA JUMLAH

    SATUAN JUMLAH TOTAL

    ( Rp ) ( Rp ) ( Rp )

    1 3 4 5 6 7

    I

    1 1 Ls 500,000.00  500,000.00 

    2 1 Ls 1,500,000.00  1,500,000.00 

    2,000,000.00 

    II PEKERJAAN KONSTRUKSI

    1 Lingkar Utara

    a. Perempatan Satpol PP - Perempatan Tegal Sari

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 9 m 5 Unit 5,858,000.00  29,290,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 5 Unit 6,064,000.00  30,320,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 7 Gawang 545,000.00  3,815,000.00 

    untuk jarak antar gawang 40 m

    b.Perempatan Tegal Sari - Perempatan Kayu Lawang

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 9 m 2 Unit 5,858,000.00  11,716,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 2 Unit 6,064,000.00  12,128,000.00 

    lampu induksi 120 W Komplitc . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 2 Gawang 588,000.00  1,176,000.00 

    untuk jarak antar gawang 45 m

    c. Perempatan Kayu Lawang - Pertigaan Berjan

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 9 m 3 Unit 5,858,000.00  17,574,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 3 Unit 6,064,000.00  18,192,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 2 Gawang 545,000.00  1,090,000.00 

    untuk jarak antar gawang 40 m

    d.Pertigaan Berjan - Pertigaan Cawang Seren

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 9 m 3 Unit 5,858,000.00  17,574,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 3 Unit 6,064,000.00  18,192,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 3 Gawang 502,000.00  1,506,000.00 

    untuk jarak antar gawang 35 m

    2 Lingkar Barat

    a. TMP - Jembatan Sucen

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 9 m 4 Unit 5,858,000.00  23,432,000.00 

    tanpa sambunganb. Pasang Armature IP 65 + 4 Unit 6,064,000.00  24,256,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 4 Gawang 588,000.00  2,352,000.00 

    untuk jarak antar gawang 45 m

    b.RS. Ananda - STAIN NU

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 9 m 5 Unit 5,858,000.00  29,290,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 5 Unit 6,064,000.00  30,320,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 4 Gawang 588,000.00  2,352,000.00 

    untuk jarak antar gawang 45 m

    3 Lingkar Selatan

    a. Belakang SMK N 1 - Perempatan Condongsari

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 9 m 3 Unit 5,858,000.00  17,574,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 3 Unit 6,064,000.00  18,192,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 3 Gawang 502,000.00  1,506,000.00 untu ara antar gawang m

    NO VOL. SAT.URAIAN PEKERJAAN

    Papan Nama Kegiatan

    Uit zet / Survey

    DAFTAR KUANTITAS DAN HARGA

    KEGIATAN

    LOKASI

    T.A

    2

    PEKERJAAN PERSIAPAN

  • 8/17/2019 lap akhir bab V

    2/3

    HARGA JUMLAH

    SATUAN JUMLAH TOTAL

    ( Rp ) ( Rp ) ( Rp )

    1 3 4 5 6 7

    NO VOL. SAT.URAIAN PEKERJAAN

    2

    b.Perempatan Demangan - RM. Mbk. Tin

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 9 m 3 Unit 5,858,000.00  17,574,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 3 Unit 6,064,000.00  18,192,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 3 Gawang 545,000.00  1,635,000.00 

    untuk jarak antar gawang 40 m

    c. Tikungan Pakis - Gudang WINGSa. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 9 m 4 Unit 5,858,000.00  23,432,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 4 Unit 6,064,000.00  24,256,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 4 Gawang 545,000.00  2,180,000.00 

    untuk jarak antar gawang 40 m

    4 Perempatan Cangkrep Lor - Buk Bening

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 2 Unit 4,738,000.00  9,476,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 2 Unit 6,064,000.00  12,128,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 2 Gawang 458,000.00  916,000.00 

    untuk jarak antar gawang 30 m

    5 Buk Ganggeng

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 6 Unit 4,738,000.00  28,428,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 6 Unit 6,064,000.00  36,384,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 6 Gawang 502,000.00  3,012,000.00 

    untuk jarak antar gawang 40 m

    d. Pasang Box Panel & Panel Kontrol + 1 Unit 3,747,000.00  3,747,000.00 

    KWH 4400 VA 

    6.a Perempatan Pasar Mati (Cangkrep) - Pertigaan Kedung Sari (Spot 1)

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 4 Unit 4,738,000.00  18,952,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 4 Unit 6,064,000.00  24,256,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 5 Gawang 545,000.00  2,725,000.00 

    untuk jarak antar gawang 40 m

    d. Pasang Box Panel & Panel Kontrol + 1 Unit 3,747,000.00  3,747,000.00 

    KWH 4400 VA 

    6.b Perempatan Pasar Mati (Cangkrep) - Pertigaan Kedung Sari (Spot 2)

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 6 Unit 4,738,000.00  28,428,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 6 Unit 6,064,000.00  36,384,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 6 Gawang 588,000.00  3,528,000.00 

    untuk jarak antar gawang 45 m

    d. Pasang Box Panel & Panel Kontrol + 1 Unit 3,747,000.00  3,747,000.00 KWH 4400 VA 

    7.a Pertigaan Doplang - Perempatan Perum Sucen (Spot 1)

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 3 Unit 4,738,000.00  14,214,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 3 Unit 6,064,000.00  18,192,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 3 Gawang 502,000.00  1,506,000.00 

    untuk jarak antar gawang 35 m

    7.b Pertigaan Doplang - Perempatan Perum Sucen (Spot 2)

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 4 Unit 4,738,000.00  18,952,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 4 Unit 6,064,000.00  24,256,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 4 Gawang 545,000.00  2,180,000.00 

    untuk jarak antar gawang 40 m

    7.c Pertigaan Doplang - Perempatan Perum Sucen (Spot 3)

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 3 Unit 4,738,000.00  14,214,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 3 Unit 6,064,000.00  18,192,000.00 

    lampu induksi 120 W Komplitc . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 3 Gawang 502,000.00  1,506,000.00 

    untuk jarak antar gawang 35 m

    d. Pasang Box Panel & Panel Kontrol + 1 Unit 3,747,000.00  3,747,000.00 

    KWH 4400 VA 

    8 Buk Bening - Pertigaan Brenggong

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 5 Unit 4,738,000.00  23,690,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 5 Unit 6,064,000.00  30,320,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 5 Gawang 502,000.00  2,510,000.00 

    untuk jarak antar gawang 35 m

    d. Pasang Box Panel & Panel Kontrol + 1 Unit 3,747,000.00  3,747,000.00 

    KWH 4400 VA 

    9 Monumen Urip Sumoharjo - Tegal Rejo

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 4 Unit 4,738,000.00  18,952,000.00 

  • 8/17/2019 lap akhir bab V

    3/3

    HARGA JUMLAH

    SATUAN JUMLAH TOTAL

    ( Rp ) ( Rp ) ( Rp )

    1 3 4 5 6 7

    NO VOL. SAT.URAIAN PEKERJAAN

    2

      tanpa sambungan

    b. Pasang Armature IP 65 + 4 Unit 6,064,000.00  24,256,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 4 Gawang 502,000.00  2,008,000.00 

    untuk jarak antar gawang 35 m

    10 Monumen Urip Sumoharjo - Boro Pepabri

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 4 Unit 4,738,000.00  18,952,000.00 

    tanpa sambunganb. Pasang Armature IP 65 + 4 Unit 6,064,000.00  24,256,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 4 Gawang 545,000.00  2,180,000.00 

    untuk jarak antar gawang 40 m

    11 SMP Negri 22 Purworejo

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 7 m 2 Unit 4,738,000.00  9,476,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 2 Unit 6,064,000.00  12,128,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 3 Gawang 545,000.00  1,635,000.00 

    untuk jarak antar gawang 40 m

    d. Pasang Box Panel & Panel Kontrol + 1 Unit 3,067,000.00  3,067,000.00 

    KWH 1300 VA 

    12 Kecamatan Kaligesing

    a. Pasang T iang lampu oktagonal GIP, Cb 2 , h = 9 m 1 Unit 4,738,000.00  4,738,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 1 Unit 6,064,000.00  6,064,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 1 Gawang 545,000.00  545,000.00 

    untuk jarak antar gawang 40 m

    13 Keburuan (Jln. Daendels)

    a. Pasang T iang lampu oktagonal GIP, Cb 1 , h = 9 m 4 Unit 5,858,000.00  23,432,000.00 

    tanpa sambungan

    b. Pasang Armature IP 65 + 4 Unit 6,064,000.00  24,256,000.00 

    lampu induksi 120 W Komplit

    c . Pasang Kabel DX 2 x 16 Sqmm + Accessor is 7 Gawang 632,000.00  4,424,000.00 

    untuk jarak antar gawang 50 m

    d. Pasang Box Panel & Panel Kontrol + 1 Unit 3,747,000.00  3,747,000.00 

    KWH 4400 VA 

    972,569,000.00 

    III A. BIAYA PENYAMBUNGAN (BP)

    a. Daya sampai dengan 2200 VA 1,300  VA 937 1,218,100.00 

    b. Daya diatas 2200 VA 26,400  VA 969 25,581,600.00 

    B. UANG JAMINAN LANGGANAN (UJL) 27,700  VA 298 8,254,600.00 

    35,054,300.00 

    IV BONGKAR TIANG DAN STANG + ARMATUREa. Bongkar Stang + Lampu Swadaya 3 Buah 128,000.00  384,000.00 

    b. Bongkar Stang + Lampu DPU 17 Buah 128,000.00  2,176,000.00 

    c. Bongkar Tiang + Stang + Lampu DPU 11 Buah 139,000.00  1,529,000.00 

    2,560,000.00 

     V  7 Buah 30,000.00  210,000.00 

    210,000.00 

     VI

    1 1 Ls 950,000.00  950,000.00 

    950,000.00 

    PEKERJAAN LAIN - LAIN

    Pembersihan Sisa Pekerjaan

    PENOMORAN BOX PANEL KWH-METER