KURVA S PEKERJAAN PONDASIILMUSIPIL.COM
NO Pekerjaan Harga pekerjaanhari
1 2 3
1 Persiapan Rp 100,000.00 6 9.09 1.52 1.52 1.52 2 Galian tanah Rp 150,000.00 2 13.64 6.82 6.82 3 Lantai kerja Rp 200,000.00 2 18.18 9.09 9.09 4 Urugan pasir Rp 150,000.00 1 13.64 13.64 5 Pasangan batu kali Rp 400,000.00 3 36.36 12.12
6 Urugan kembali Rp 100,000.00 1 9.09
Jumlah Rp 1,100,000.00 100.00 1.52 17.42 43.18
jumlah akumulatif 1.52 18.94 62.12
KURVA S PEKERJAAN PONDASIILMUSIPIL.COM
NO Pekerjaan Harga pekerjaanhari
1 2 3
1 Persiapan Rp 100,000.00 6 9.09 1.52 1.52 1.52 2 Galian tanah Rp 150,000.00 2 13.64 6.82 6.82 3 Lantai kerja Rp 200,000.00 2 18.18 9.09 9.09 4 Urugan pasir Rp 150,000.00 1 13.64 13.64 5 Pasangan batu kali Rp 400,000.00 3 36.36 12.12
6 Urugan kembali Rp 100,000.00 1 9.09
Jumlah Rp 1,100,000.00 100.00 1.52 17.42 43.18
jumlah akumulatif 1.52 18.94 62.12
durasi
bobot (%)
durasi
bobot (%)
1 2 3 4 5 6
![Page 2: KURVAS](https://reader030.fdokumen.com/reader030/viewer/2022020506/56d6bec51a28ab30169381d3/html5/thumbnails/2.jpg)
KURVA S PEKERJAAN PONDASI
harigrafik
4 5 6
1.52 1.52 1.52 100806040
12.12 12.12 20
9.09 0
13.64 22.73 1.52
75.76 98.48 100.00
KURVA S PEKERJAAN PONDASI
harigrafik
4 5 6
1.52 1.52 1.52 100806040
12.12 12.12 20
9.09 0
13.64 22.73 1.52
75.76 98.48 100.00
1 2 3 4 5 6