    Midtest Struktur Beton Prategang

    Rislia Maulida (H8A105057) 1

    Kehilangan Tegangan

    Kehilangan Seketika

    Perpendekan Elastis

    Pascatarik

    As = 4 195 = 780 mm2.

    Ac = 526.000 mm2.

    Es = 200.000 MPa.

    Ec = 4.700 (fc)1/2

    = 4.700 (50)1/2

    = 33.234,02 MPa.

    n = Es / Ec = 200.000 / 33.234,02 = 6,02 6.

    Pi = fc As = 1.050 780 = 819.000 N.

    fc = Pi / Ac = 819.000 / 526.000 = 1,56 MPa.

    ES = n fc = 6 (819.000 / 526.000) = 9,34 MPa.

    % ES = (9,34 / 1.050) 100% = 0,89%.

    ES = 0,5 (Es / Ec) fc = 0,5 6 1,56 = 4,68 MPa.

    % ES = (4,68 / 1.050) 100% = 0,45%.

    Diambil: ES = 9,34 MPa.

    % ES = 0,89%.

  • 8/3/2019 Kehilangan Tegangan Pascatarik

    2/4

    Midtest Struktur Beton Prategang

    Rislia Maulida (H8A105057) 2

    Gesekan pada Tendon

    Asumsi: = 0,131

    Tendon kawat:

    K = 0,0049 per meter.

    = 0,15.

    (P2 - P1)/P1 = -KL - = -0,0049 10 0,15 (0,131) = 0,07 7%.

    Slip pada Angkur

    Rata-rata slip = 2,5 mm.

    L = (fc / Es) L = (1.050 / 200.000) 10.000 = 52,5 mm.

    ANC = (2,5 / 52,5) 100 % = 4,76 %.

    Kehilangan Tegangan Tergantung Waktu

    Rangkak pada Beton

    Regangan Rangkak Batas

    CR = ce fc Es = (35 10-6

    ) 1,56 200.000 = 10,9 MPa.

    % CR = (10,9 / 1.050) 100 % = 1,04 %.

    Koefisien Rangkak

    CR = fc n = 1,6 1,56 6 = 14,95 MPa.

    % CR = (14,95 / 1.050) 100 % = 1,42 %.

  • 8/3/2019 Kehilangan Tegangan Pascatarik

    3/4

    Midtest Struktur Beton Prategang

    Rislia Maulida (H8A105057) 3

    Diambil: CR = 14,95 MPa.

    % CR = 1,42 %.

    Susut pada Beton

    cs = (200 10-6

    ) / log10 (t + 2) = (200 10-6

    ) / log10 (20 + 2) = 0,00015.

    SH = cs Es = 0,00015 200.000 = 30 MPa.

    % SH = (30 / 1.050) 100 % = 2,86 %.

    Asumsi: RH = 75%

    sh = (8,2 10-6

    ) (1 0,06 V/S) (100 RH)

    sh= (8,2 10-6

    ) (1 0,06 3) (100 75)

    sh= 1,68 10-4

    .

    SH = sh Ksh Es = (1,68 10-4

    ) 0,64 200.000 = 21,504 MPa.

    % SH = (21,504 / 1.050) 100 % = 2,05 %.

    Diambil: SH = 30 MPa.

    % SH = 2,86 %.

    Relaksasi Baja

    RE = C [Kre J (SH + CR + ES)]

    RE = 1,45 [138 0,15 (30 + 14,95 + 9,34)]

    RE = 188,29 MPa.

    % RE = (188,29 / 1.050) 100 % = 17,93 %.

  • 8/3/2019 Kehilangan Tegangan Pascatarik

    4/4

    Midtest Struktur Beton Prategang

    Rislia Maulida (H8A105057) 4

    Kesimpulan:

    Kehilangan Seketika:

    - Perpendekan Elastis: % ES = 0,89 %.- Gesekan pada Tendon: (P2 - P1)/P1 = 7%.- Slip pada Angkur: ANC = 4,76 %.

    Kehilangan Tegangan Tergantung Waktu:

    - Rangkak pada Beton: % CR = 1,42 %.- Susut pada Beton: % SH = 2,86 %.- Relaksasi Baja: % RE = 17,93 %.

    Total Kehilangan Gaya Prategang Pascatarik = 34,86 %.