HARGA_UPAH_DAN_BAHAN_2014

7
HARGA SATUAN KOMPONEN ( Rp ) 1 3 4 5 6 A TENAGA 1 Mandor L061 Jam 1.00 16,208.10 Rp 2 Mekanik Terampil L071 Jam 1.00 14,345.10 Rp 3 Mekanik Pembantu L072 Jam 1.00 10,246.50 Rp 4 Kepala Tukang Kayu L073 Jam 1.00 13,972.50 Rp 5 Kepala Tukang Batu L074 Jam 1.00 13,972.50 Rp 6 Kepala Tukang Besi L075 Jam 1.00 13,972.50 Rp 7 Tukang Gali L076 Jam 1.00 10,246.50 Rp 8 Tukang Cat L077 Jam 1.00 10,246.50 Rp 9 Tukang Kayu Konstruksi L078 Jam 1.00 12,109.50 Rp 10 Tukang Batu L079 Jam 1.00 12,109.50 Rp 11 Tukang Pipa L080 Jam 1.00 12,109.50 Rp 12 Tukang Listrik (TR) L081 Jam 1.00 11,178.00 Rp 13 Tukang Montage / Ereksi L082 Jam 1.00 10,246.50 Rp 14 Tukang Las L083 Jam 1.00 10,246.50 Rp 15 Tukang Pancang L084 Jam 1.00 10,246.50 Rp 16 Tukang Tebas L085 Jam 1.00 10,246.50 Rp 17 Tukang Anyaman (Pembesian) L086 Jam 1.00 10,246.50 Rp 18 Pekerja (Tanpa Keahlian) L087 Jam 1.00 9,315.00 Rp 19 Operator Terlatih L089 Jam 1.00 14,904.00 Rp 20 Operator Kurang Teralatih L090 Jam 1.00 13,041.00 Rp 21 Pembantu Operator L091 Jam 1.00 10,246.50 Rp 22 Sopir Truck L092 Jam 1.00 11,178.00 Rp 23 Sopir Personil L093 Jam 1.00 10,246.50 Rp 24 Pembantu Sopir L094 Jam 1.00 8,383.49 Rp 25 Buruh Lapangan Tak Terlatih L095 Jam 1.00 9,315.00 Rp 26 Buruh Lapangan Agak Terlatih L096 Jam 1.00 10,246.50 Rp 27 Buruh Lapangan Terlatih L097 Jam 1.00 11,178.00 Rp 2 UPAH DAFTAR HARGA UPAH TAHUN ANGGARAN 2014 KABUPATEN MALINAU NO URAIAN KODE SATUAN KOMPONEN SATUAN

description

HBSU

Transcript of HARGA_UPAH_DAN_BAHAN_2014

Page 1: HARGA_UPAH_DAN_BAHAN_2014

HARGA

SATUAN

KOMPONEN

( Rp )

1 3 4 5 6

A TENAGA

1 Mandor L061 Jam 1.00 16,208.10Rp

2 Mekanik Terampil L071 Jam 1.00 14,345.10Rp

3 Mekanik Pembantu L072 Jam 1.00 10,246.50Rp

4 Kepala Tukang Kayu L073 Jam 1.00 13,972.50Rp

5 Kepala Tukang Batu L074 Jam 1.00 13,972.50Rp

6 Kepala Tukang Besi L075 Jam 1.00 13,972.50Rp

7 Tukang Gali L076 Jam 1.00 10,246.50Rp

8 Tukang Cat L077 Jam 1.00 10,246.50Rp

9 Tukang Kayu Konstruksi L078 Jam 1.00 12,109.50Rp

10 Tukang Batu L079 Jam 1.00 12,109.50Rp

11 Tukang Pipa L080 Jam 1.00 12,109.50Rp

12 Tukang Listrik (TR) L081 Jam 1.00 11,178.00Rp

13 Tukang Montage / Ereksi L082 Jam 1.00 10,246.50Rp

14 Tukang Las L083 Jam 1.00 10,246.50Rp

15 Tukang Pancang L084 Jam 1.00 10,246.50Rp

16 Tukang Tebas L085 Jam 1.00 10,246.50Rp

17 Tukang Anyaman (Pembesian) L086 Jam 1.00 10,246.50Rp

18 Pekerja (Tanpa Keahlian) L087 Jam 1.00 9,315.00Rp

19 Operator Terlatih L089 Jam 1.00 14,904.00Rp

20 Operator Kurang Teralatih L090 Jam 1.00 13,041.00Rp

21 Pembantu Operator L091 Jam 1.00 10,246.50Rp

22 Sopir Truck L092 Jam 1.00 11,178.00Rp

23 Sopir Personil L093 Jam 1.00 10,246.50Rp

24 Pembantu Sopir L094 Jam 1.00 8,383.49Rp

25 Buruh Lapangan Tak Terlatih L095 Jam 1.00 9,315.00Rp

26 Buruh Lapangan Agak Terlatih L096 Jam 1.00 10,246.50Rp

27 Buruh Lapangan Terlatih L097 Jam 1.00 11,178.00Rp

2

UPAH

DAFTAR HARGA UPAH

TAHUN ANGGARAN 2014

KABUPATEN MALINAU

NO URAIAN KODESATUAN

KOMPONENSATUAN

Page 2: HARGA_UPAH_DAN_BAHAN_2014

standarisasi 2014

HARGA

SATUAN

KOMPONEN

( Rp )

1 3 4 5 6

B BAHAN

1. PASIR, BATU, TANAH, BATA, BATAKO, DAN TEGEL

1.1 Pasir Pasangan M043 M3

1.00 120,000.00Rp

1.2 Pasir M040 M3

1.00 115,000.00Rp

1.3 Batu Gunung M010 M3

1.00 170,000.00Rp

1.4 Batu Pecah 70-80 cm (Ex. Palu) M020 M3 1.00 495,000.00Rp

1.5 Batu Pecah 20-30 cm (Ex. Palu) M020 M3 1.00 495,000.00Rp

1.6 Batu Pecah 15-20 cm (Ex. Palu) M020 M3 1.00 495,000.00Rp

1.7 Batu Pecah 5 - 7 cm (Ex. Palu) M022 M3 1.00 495,000.00Rp

1.8 Batu Pecah 3 - 5 cm (Ex. Palu) M023 M3 1.00 495,000.00Rp

1.9 Batu Pecah 2 - 3 cm (Ex. Palu) M024 M3 1.00 495,000.00Rp

1.10 Batu Pecah 1 - 2 cm (Ex. Palu) M025 M3 1.00 495,000.00Rp

1.11 Batu Pecah 0.5 - 1 cm (Ex. Palu) M026 M3 1.00 495,000.00Rp

1.12 Batu Pecah 70 - 80cm (Ex. Malinau) - M3

1.00 385,000.00Rp

1.13 Batu Pecah 20 - 30cm (Ex. Malinau) - M3

1.00 385,000.00Rp

1.14 Batu Pecah 15 - 20cm (Ex. Malinau) - M3

1.00 385,000.00Rp

1.15 Batu Pecah 5 - 7 cm (Ex. Malinau) - M3

1.00 385,000.00Rp

1.16 Batu Pecah 3 - 5 cm (Ex. Malinau) - M3

1.00 385,000.00Rp

1.17 Batu Pecah 2 - 3 cm (Ex. Malinau) - M3

1.00 385,000.00Rp

1.18 Batu Pecah 1 - 2 cm (Ex. Malinau) - M3

1.00 385,000.00Rp

1.19 Batu Pecah 0.5 - 1 cm (Ex. Malinau) - M3

1.00 385,000.00Rp

1.20 Abu Batu - M3

1.00 385,000.00Rp

1.21 Batu Kali - M3

1.00 280,000.00Rp

1.22 Agregat Kasar - M3

1.00 355,000.00Rp

1.23 Agregat Halus - M3

1.00 355,000.00Rp

1.24 Filler M05 Kg 1.00 1,150.00Rp

1.25 Sirtu / Krikil Tak Tersaring M042 M3

1.00 187,500.00Rp

1.26 Sirtu / Krikil disaring - M3

1.00 208,000.00Rp

1.27 Kerikil Sungai - M3

1.00 98,300.00Rp

1.28 Kerikil Cor Beton - M3

1.00 304,000.00Rp

1.29 Tanah Uruk Pilihan M050 M3

1.00 98,500.00Rp

1.30 Tanah Uruk Biasa M051 M3

1.00 15,000.00Rp

1.31 Bata Merah - Bh 1.00 1,500.00Rp

1.32 Batako uk. 8x15x30 - Bh 1.00 4,500.00Rp

1.33 Batako uk. 8x20x40 - Bh 1.00 6,000.00Rp

1.34 Batu Alur Cetak 5x20x40 cm - Bh 1.00 14,000.00Rp

1.35 Tegel Keramik - Kotak 1.00 88,500.00Rp

1.36 Tegel Mozaik - Kotak 1.00 120,600.00Rp

2. SEMEN, BESI BETON, BAJA, ALUMUNIUM, PAKU, BAUT, DAN SENG

2.1 Semen / PC 50 Kg M080 Kg 1.00 2,200.00Rp

2.2 Semen Putih - Zak 1.00 114,500.00Rp

2.3 Besi Beton M013 Kg 1.00 17,500.00Rp

2.4 Besi Polos - Kg 1.00 -Rp

2.5 Kawat Beton/Bendrat M168 Kg 1.00 27,800.00Rp

2.6 Besi Holow -Rp

2.7 Baja Polos - Kg 1.00 13,900.00Rp

2.8 Baja Profil ( Rangka Baja I, H, U ) - Kg 1.00 31,500.00Rp

2.9 Muur / Baut Baja dan lain-lain M163 Kg 1.00 22,000.00Rp

2.10 Palt U 6,5 - 400 Pengikat Kuda-kuda - Bh 1.00 17,000.00Rp

2.11 Besi Klam U - Kg 1.00 47,750.00Rp

2.12 Besi AS Dia 0,5 Inchi - Batang 1.00 271,900.00Rp

2.13 Besi AS Dia 1 Inchi - Batang 1.00 404,500.00Rp

2.14 Besi AS Dia 1,5 Inchi - Batang 1.00 519,500.00Rp

2.15 Aluminium 0,7 mm - Ljr 1.00 197,500.00Rp

2

MATERIAL

DAFTAR HARGA MATERIAL

TAHUN ANGGARAN 2014

KABUPATEN MALINAU

NO URAIAN KODESATUAN

KOMPONENSATUAN

Page 3: HARGA_UPAH_DAN_BAHAN_2014

2.16 Aluminium 0,8 mm - Ljr 1.00 260,000.00Rp

2.17 Paku Ulin M018 Kg 1.00 20,000.00Rp

2.18 Paku Biasa - Kg 1.00 17,500.00Rp

2.19 Paku Genteng - Bh 1.00 1,300.00Rp

2.20 Paku Sekrup - Bh 1.00 1,900.00Rp

2.21 Paku Zeng - Kg 1.00 26,000.00Rp

2.22 Paku Sirap - Kg 1.00 28,500.00Rp

2.23 Paku Sumbat - Bh 1.00 800.00Rp

2.24 Baut Dia 1/2 Inchi - 15 Cm - Kg 1.00 25,200.00Rp

2.25 Baut Dia 3/8 Inchi - 15 Cm - Kg 1.00 25,200.00Rp

2.26 Baut Pangkal Kuda - Kuda - Kg 1.00 25,200.00Rp

2.27 Seng Gelombang BJLS 20 - Lembar 1.00 49,000.00Rp

2.28 Seng Gelombang BJLS 30 - Lembar 1.00 49,000.00Rp

2.29 Seng Plat BJLS 20 ( l = 30 cm ) - MI

1.00 16,700.00Rp

2.30 Seng Plat BJLS 30 ( l = 40 cm ) - MI

1.00 16,700.00Rp

2.31 Kawat Harmonika 1 M - Roll 1.00 887,500.00Rp

3. KAYU, PLYWOOD DAN BAHAN PLAFON

3.1 Kayu Bakar - M3

1.00 252,000.00Rp

3.2 Kayu Laut Dia = 15 Cm - Batang 1.00 28,500.00Rp

3.3 Kayu Log/Gelondongan - M3

1.00 883,000.00Rp

3.4 Kayu Untuk Perancah / Begisting - M3

1.00 1,000,000.00Rp

3.5 Balok Kayu Meranti - M3

1.00 1,700,000.00Rp

3.6 Papan Kayu Meranti - M3

1.00 1,700,000.00Rp

3.7 Balok Kayu Kapur - M3

1.00 2,000,000.00Rp

3.8 Papan Kayu Kapur - M3

1.00 2,000,000.00Rp

3.9 Balok Kayu Bengkirai - M3

1.00 2,200,000.00Rp

3.10 Papan Kayu Bengkirai - M3

1.00 2,300,000.00Rp

3.11 Balok Ulin 10/10 Cm - M3

1.00 4,000,000.00Rp

3.12 Balok Ulin 15/15 Cm - M3

1.00 4,000,000.00Rp

3.13 Balok Ulin 12/12 Cm - M3

1.00 4,000,000.00Rp

3.14 Balok Ulin 15/15 Cm - M3

1.00 4,000,000.00Rp

3.15 Balok Ulin 20/20 Cm - M3

1.00 4,000,000.00Rp

3.16 Balok Ulin 5/10 Cm - M3

1.00 4,000,000.00Rp

3.17 Papan Ulin M3

1.00 5,000,000.00Rp

3.19 Plywood 4 mm - Lembar 1.00 68,000.00Rp

3.24 Texwood - Lembar 1.00 103,800.00Rp

3.25 Plafon Nitobo - Lembar 1.00 83,000.00Rp

4. ASPAL, BBM, PELUMAS, PLUMIR, CAT, LEM, DAN AIR

4.1 Aspal Bitument M061 Kg 1.00 13,300.00Rp

4.2 Aspal Buton M062 Kg 1.00 10,700.00Rp

4.3 Minyak Aspal M064 Ltr 1.00 13,900.00Rp

4.4 Kerosin/Minyak Tanah M165 Ltr 1.00 6,250.00Rp

4.5 Tear - Kg 1.00 21,400.00Rp

4.6 Solar (Industri) M183 Ltr 1.00 14,000.00Rp

4.7 Bensin (Industri) M184 Ltr 1.00 14,000.00Rp

4.8 Minyak Pelumas M185 Ltr 1.00 45,800.00Rp

4.9 Minyak Fluks - Liter 1.00 8,800.00Rp

4.10 Minyak Cat - Liter 1.00 30,150.00Rp

4.11 Dempul / Plamir - Kg 1.00 43,000.00Rp

4.12 Plamir Kayu - Kaleng 1.00 43,000.00Rp

4.13 Plamir Tembok - Kaleng 1.00 40,200.00Rp

4.14 Cat Air - Kg 1.00 93,500.00Rp

4.15 Cat Air Interior Anti Lumut - Kg 1.00 285,000.00Rp

4.16 Cat Air Exterior Anti Lumut - Kg 1.00 320,000.00Rp

4.17 Cat Atap - Kg 1.00 35,000.00Rp

4.18 Cat Jembatan - Zak 1.00 35,000.00Rp

4.19 Cat Kilap - Kg 1.00 50,500.00Rp

4.20 Cat Menie - Kg 1.00 31,500.00Rp

4.21 Lem Kayu - Kg 1.00 75,500.00Rp

4.22 Air Bersih - M3

1.00 37,500.00Rp

Page 4: HARGA_UPAH_DAN_BAHAN_2014

5. PIPA DAN ACESORIES

5.1 Bend Material DCI :

- Bend 90o All Flange DCI dia. 160 mm Buah 1.00 349,440.00Rp

- Bend 90o All Flange DCI dia. 110 mm Buah 1.00 291,200.00Rp

- Bend 90o All Flange DCI dia. 90 mm Buah 1.00 224,328.00Rp

- Bend 45o All Flange DCI dia. 160 mm Buah 1.00 338,000.00Rp

- Bend 45o All Flange DCI dia. 110 mm Buah 1.00 296,400.00Rp

- Bend 45o All Flange DCI dia. 80 mm Buah 1.00 222,560.00Rp

5.2 Butterfly Valve DCI :

- Butterfly Valve DCI dia. 50 mm Buah 1.00 990,600.00Rp

5.3 Check Valve Material DCI :

- Check Valve DCI dia. 150 mm Buah 1.00 3,889,489.50Rp

- Check Valve DCI dia. 100 mm Buah 1.00 2,600,000.00Rp

- Check Valve DCI dia. 80 mm Buah 1.00 1,729,484.58Rp

- Check Valve DCI dia. 50 mm Buah 1.00 1,079,278.20Rp

5.4 Flange Material Steel : (Loose Flange)

- Flange Steel dia. 160 mm Buah 1.00 425,880.00Rp

- Flange Steel dia. 110 mm Buah 1.00 390,000.00Rp

- Flange Steel dia. 90 mm Buah 1.00 236,600.00Rp

- Flange Steel dia.63 mm Buah 1.00 135,200.00Rp

- Gate Valve GI dia. 400 mm (16") unit 1.00 45,500,000.00Rp

- Gate Valve GI dia. 315 mm (12") unit 1.00 16,900,000.00Rp

- Gate Valve GI dia. 250 mm (10") unit 1.00 11,700,000.00Rp

- Gate Valve GI dia. 200 mm (8") unit 1.00 7,150,000.00Rp

- Gate Valve GI dia. 150 mm (6") unit 1.00 5,720,000.00Rp

- Gate Valve GI dia. 110 mm (4") unit 1.00 2,860,000.00Rp

- Gate Valve GI dia. 90 mm (3") unit 1.00 2,470,000.00Rp

- Gate Valve GI dia. 63 mm (2") unit 1.00 1,560,000.00Rp

- Gate Valve GI dia. 20 mm (1/2") unit 1.00 495,238.10Rp

5.5 Gate Valve Material DCI :

- Gate Valve DCI dia. 160 mm Buah 1.00 3,907,800.00Rp

- Gate Valve DCI dia.110 mm Buah 1.00 2,489,292.00Rp

- Gate Valve DCI dia. 90 mm Buah 1.00 1,430,728.00Rp

- Gate Valve DCI dia. 63 mm Buah 1.00 1,014,520.00Rp

5.6 Reducer Material DCI :

- Reducer All Flange DCI dia. 150 x 80 mm Buah 1.00 686,649.60Rp

- Reducer All Flange DCI dia. 100 x 80 mm Buah 1.00 502,320.00Rp

- Reducer All Flange DCI dia. 100 x 50 mm Buah 1.00 462,800.00Rp

- Reducer All Flange DCI dia. 80 x 50 mm Buah 1.00 441,480.00Rp

5.7 PIPA GI :

- Dia. 160 mm M' 1.00 1,495,000.00Rp

- Dia. 110 mm M' 1.00 1,118,000.00Rp

5.8 Tee Material GI :

- Tee SP/SP GI dia. 160 X 160 mm X 160 mm Buah 1.00 1,049,100.00Rp

- Tee SP/SP GI dia. 160 X 50 X 160 mm Buah 1.00 494,059.80Rp

5.9 Tee Material HDPE :

5.10 Valve Socket PVC (Female Threat) dia. 90 mm unit 1.00 1,729,481.00Rp

5.11 PIPA HDPE

- Dia. 200 mm M' 1.00 712,400.00Rp

- Dia. 160 mm M' 1.00 390,000.00Rp

- Dia. 100 mm M' 1.00 223,600.00Rp

- Dia. 90 mm M' 1.00 156,000.00Rp

- Dia. 63 mm M' 1.00 72,800.00Rp

5.12 TEE HDPE

- Dia. 160 mm x 160 mm X 90 mm Buah 1.00 494,728.00Rp

- Dia. 160 mm x 160 mm X 63 mm Buah 1.00 518,544.00Rp

- Dia. 90 mm x 90 mm X 90 mm Buah 1.00 300,040.00Rp

- Dia. 90 mm x 90 mm X 63 mm Buah 1.00 307,424.00Rp

- Dia. 63 mm x 63 mm X 63 mm Buah 1.00 183,775.80Rp

5.13 BEND/ELBOW HDPE

- 900 Dia. 160 mm Buah 1.00 475,800.00Rp

- 900 Dia. 90 mm Buah 1.00 235,560.00Rp

- 900 Dia. 63 mm Buah 1.00 132,600.00Rp

- 450 Dia. 160 mm Buah 1.00 442,728.00Rp

- 450 Dia. 90 mm Buah 1.00 225,160.00Rp

Page 5: HARGA_UPAH_DAN_BAHAN_2014

5.14 STUB FLANGE HDPE

- Dia. 160 mm Buah 1.00 548,938.00Rp

- Dia. 90 mm Buah 1.00 159,380.00Rp

- Dia. 63 mm Buah 1.00 111,800.00Rp

5.15 REDUCSER HDPE

- Dia. 90 mm x 63 mm Buah 1.00 195,052.00Rp

5.16 END CAP

- Dia. 160 mm Buah 1.00 223,860.00Rp

- Dia. 90 mm Buah 1.00 120,328.00Rp

- Dia. 63 mm Buah 1.00 59,540.00Rp

5.17 Air Valve dengan Clamp Plat Baja

- Air Valve 1/2" lengkap dengan Clamp dia. 6" Buah 1.00 702,728.00Rp

- Air Valve 1/2" lengkap dengan Clamp dia. 3"

5.18 - Fleksibe Joint Steel FL/FL dia. 100 mm unit 1.00 4,225,000.00Rp

5.19 - Angker Baut dia. 14 mm Buah 1.00 18,720.00Rp

5.20 Pipa Galvanis dia. 50 mm m 1.00 67,600.00Rp

5.21 Pipa D PVC dia. 100 mm Ljr 1.00 436,800.00Rp

5.22 Pipa D PVC dia. 75 mm Ljr 1.00 286,520.00Rp

5.23 Elbow 90 dia . 100 mm Buah 1.00 99,320.00Rp

5.24 Elbow 90 dia . 75 mm Buah 1.00 67,600.00Rp

5.25 Water Drain & Aksesoris st 1.00 312,000.00Rp

5.26 Water Proofing Sika Top 107 m2 1.00 104,000.00Rp

5.27 Water Stop Sika (lebar 230 - 320 mm) m 1.00 145,600.00Rp

5.28 Water Stop Sika (lebar 200 mm) m 1.00 91,000.00Rp

5.29 Water Stop Sika (lebar 150 mm) m 1.00 72,800.00Rp

5.30 Dismantling Joint DCI dia. 100 mm unit 1.00 655,390.32Rp

5.31 Paking

- Ø 160 mm (6") Buah 1.00 23,400.00Rp

- Ø 110 mm (4") Buah 1.00 21,320.00Rp

- Ø 90 mm (3") Buah 1.00 15,600.00Rp

- Ø 50 mm (2") Buah 1.00 10,400.00Rp

5.32 Alat Bantu Ls 1.00 31,200.00Rp

5.33 Pipa Galvanis ; Ø = 1/2" - Lonjor 1.00 255,555.30Rp

5.34 Pipa Galvanis ; Ø = 1" - Lonjor 1.00 383,019.00Rp

5.35 Pipa Galvanis ; Ø = 1,1/2" - Lonjor 1.00 553,807.80Rp

5.36 Pipa Galvanis ; Ø = 2" - Lonjor 1.00 723,968.70Rp

5.37 Pipa Galvanis ; Ø = 2, 1/2" - Lonjor 1.00 796,365.57Rp

5.38 Pipa Galvanis ; Ø = 3" - Lonjor 1.00 894,129.60Rp

5.39 Pipa Galvanis ; Ø = 4" - MI

1.00 120,556.80Rp

5.40 Flang Socket Galvanis ; Ø = 1/2" - Bh 1.00 15,069.60Rp

5.41 Tee Galvanis D = 1/2 Inchi - Bh 1.00 25,116.00Rp

5.42 Elbouw Galvanis ; Ø = 1/2 Inchi - Bh 1.00 10,674.30Rp

5.43 Pipa PVC D ; Ø = 1/2" - Lonjor 1.00 43,680.00Rp

5.44 Pipa PVC D ; Ø = 1" - Lonjor 1.00 43,680.00Rp

5.45 Pipa PVC D ; Ø = 1 1/2" - Lonjor 1.00 55,120.00Rp

5.46 Pipa PVC D ; Ø = 1/2" - Lonjor 1.00 37,674.00Rp

5.47 Pipa PVC D ; Ø = 2" - Lonjor 1.00 73,840.00Rp

5.48 Pipa PVC D ; Ø= 2 1/2" - Lonjor 1.00 94,120.00Rp

5.49 Pipa PVC D ; Ø = 3" - Lonjor 1.00 112,320.00Rp

5.50 Pipa PVC D ; Ø = 4" - Lonjor 1.00 192,884.64Rp

5.51 Elbouw PVC D ; Ø = 1/2 Inchi - Bh 1.00 15,697.50Rp

5.52 Elbouw PVC D ; Ø = 1 Inchi - Bh 1.00 11,930.10Rp

5.53 Elbouw PVC D ; Ø = 1 1/2 Inchi - Bh 1.00 14,441.70Rp

5.54 Elbouw PVC D ; Ø = 2 Inchi - Bh 1.00 16,953.30Rp

5.55 Elbouw PVC D ; Ø = 2 1/2 Inchi - Bh 1.00 18,209.10Rp

5.56 Elbouw PVC D; Ø = 3 Inchi - Bh 1.00 18,837.00Rp

5.57 Elbouw PVC D ; Ø = 4 Inchi - Bh 1.00 30,139.20Rp

5.58 End Mill Dia 10 - Bh 1.00 146,928.60Rp

5.59 End Mill Dia 12 - Bh 1.00 158,230.80Rp

5.60 End Mill Dia 16 - Bh 1.00 335,298.60Rp

5.61 End Mill Dia 20 - Bh 1.00 371,088.90Rp

5.62 Filter Rods Dia 2 mm Sil - Kg 1.00 120,556.80Rp

5.63 Filter Rods Dia 2 mm er 70 s - Kg 1.00 164,509.80Rp

5.64 Talang Air PVC - Lonjor 1.00 114,400.00Rp

5.65 Pipa Talang ; Ø = 4 Inchi - Lonjor 1.00 1,064,290.50Rp

Page 6: HARGA_UPAH_DAN_BAHAN_2014

6. KACA

6.1 Kaca Bening - M2

1.00 120,000.00Rp

6.2 Kaca Nako Polos T = 5 mm - Bh 1.00 17,000.00Rp

6.3 Kaca Nako Rayban T = 5 mm - Bh 1.00 20,000.00Rp

6.4 Kaca Rayban (40%) T = 5 mm - M2

1.00 25,000.00Rp

7. ALAT BANTU

7.1 Mata Gergaji Besi - Bh 1.00 15,000.00Rp

7.2 Gerobak - Bh 1.00 450,000.00Rp

7.3 Kertas Amplas - Lembar 1.00 5,500.00Rp

7.4 Sekop - Bh 1.00 82,000.00Rp

7.5 Cangkul - Bh 1.00 60,000.00Rp

7.6 Pompa Air Portable - Unit 1.00 698,500.00Rp

8. LAND SCAPE

8.1 Rumput Gajah Mini - M2

1.00 135,000.00Rp

8.2 Palm Raja Tinggi min. 1,5 m - Pohon 1.00 600,000.00Rp

8.3 Palm Botol Tinggi min. 1,5 m - Pohon 1.00 500,000.00Rp

8.4 Palm Ekor Tupai Tinggi min. 1,5 m - Pohon 1.00 500,000.00Rp

8.5 Paving Block segi enam t = 6 cm - Bh 1.00 5,000.00Rp

8.6 Paving Block segi Empat 6x10x20 cm - Bh 1.00 4,500.00Rp

9. DAUN PINTU, DAUN JENDELA, PENGGANTUNG DAN PENGUNCI

9.1 Daun Pintu Plastik

9.2 Daun Pintu Fibre Glass

9.3 Engsel 2" - Set 1.00 15,000.00Rp

9.4 Engsel 3" - Set 1.00 23,000.00Rp

9.5 Grendel 2" - Set 1.00 12,000.00Rp

9.6 Grendel 3" - Set 1.00 25,000.00Rp

9.7 Kunci Tanam - Bh 1.00 376,000.00Rp

9.8 Hak Angin - Set 1.00 25,000.00Rp

9.9 Gembok Kecil - Bh 1.00 20,000.00Rp

9.10 Gembok Sedang - Bh 1.00 33,000.00Rp

9.11 Gembok Besar - Bh 1.00 55,000.00Rp

9.12 Kunci Pintu Handle ARS - Bh 1.00 250,000.00Rp

9.13 Handle Pintu - Bh 1.00 45,000.00Rp

9.14 Handle Jendela - Bh 1.00 15,000.00Rp

10. LAIN-LAIN

10.1 Filler Gauce - Set 1.00 94,850.00Rp

10.2 Flaring Swaging - Set 1.00 184,650.00Rp

10.3 Genteng Metal - Bh 1.00 40,800.00Rp

10.4 Kloset Jongkok - Bh 1.00 195,000.00Rp

10.5 Kran Air - Bh 1.00 46,800,000.00Rp

10.6 Profil Tank Fiber Glass Kap. 1100 Ltr - Bh 1.00 2,205,000.00Rp

10.7 Geotextil Non Woven - M2

1.00 16,300.00Rp

Page 7: HARGA_UPAH_DAN_BAHAN_2014

HARGA

SATUAN

KOMPONEN

( Rp )

1 3 4 5 6

C PERALATAN

1 Air Compresor 4000-6500 L/M E301 Jam 1.00 217,136.90Rp

2 Alat Pancang ( Gravitasi ) Mekanis - Jam 1.00 61,722.74Rp

3 Asphalt Finisher E02 Jam 1.00 234,887.94Rp

4 Asphalt Liquid Mixer E34 Jam 1.00 43,248.14Rp

5 Asphalt Mixing Plant 50 T / H E01 Jam 1.00 5,644,525.92Rp

6 Asphalt Sprayer E03 Jam 1.00 72,992.06Rp

7 Bore Pile Machine E33 Jam 1.00 751,231.07Rp

8 Bulldozer 100 - 150 HP E04 Jam 1.00 669,637.52Rp

9 Concrete Mixer 0.3 - 0.6 M3 E06 Jam 1.00 57,318.58Rp

10 Concrete Pump E28 Jam 1.00 276,857.57Rp

11 Concrete Vibrator E20 Jam 1.00 54,639.68Rp

12 Crane 10 - 25 T E07 Jam 1.00 466,873.77Rp

13 Crane On Track 35 Ton E31 Jam 1.00 427,882.03Rp

14 Crusher SCR 30 T / H 185 HP - Jam 1.00 529,153.48Rp

15 Dump Truck E09 Jam 1.00 313,935.15Rp

16 Dump Truck 3 - 4 M3 E08 Jam 1.00 254,039.85Rp

17 Excavator 80-140 HP E10 Jam 1.00 381,576.72Rp

18 Flat Bed Truck 3 - 4 M3 E11 Jam 1.00 240,747.95Rp

19 Fulvi Mixer E27 Jam 1.00 178,953.80Rp

20 Generator set E12 Jam 1.00 388,153.52Rp

21 Jack Hammer E26 Jam 1.00 31,052.44Rp

22 Motor Grader >100 HP E13 Jam 1.00 503,866.94Rp

23 Pedestrian Roller E24 Jam 1.00 62,990.99Rp

24 Pile Driver + Hammer E30 Jam 1.00 85,747.00Rp

25 Screening Plant 80 HP - Jam 1.00 228,150.19Rp

26 Sprayer Selfprop - Jam 1.00 137,591.85Rp

27 Stone Crusher E21 Jam 1.00 688,127.99Rp

28 Tamper E25 Jam 1.00 44,626.74Rp

29 Tandem Roller 6 - 8 Ton E17 Jam 1.00 168,428.42Rp

30 Three Wheel Roller 6 - 8 Ton E16 Jam 1.00 187,623.09Rp

31 Tire Roller 8 - 10 Ton E18 Jam 1.00 237,410.23Rp

32 Track Loader 75 - 100 HP E14 Jam 1.00 274,514.66Rp

33 Trailer 15 Ton E35 Jam 1.00 390,920.04Rp

34 Trailler 20 Ton E29 Jam 1.00 393,134.56Rp

35 Vibratory Rolller 5 - 8 Ton E19 Jam 1.00 321,794.28Rp

36 Water Pump 70 - 100 mm E22 Jam 1.00 36,631.43Rp

37 Water Tanker 3000 - 4500 Ltr E23 Jam 1.00 251,191.59Rp

38 Welding Set E32 Jam 1.00 105,354.13Rp

39 Wheel Loader 1.0 - 1.6 M3 E15 Jam 1.00 398,558.16Rp

Malinau, 21 Januari 2014

Kepala Dinas Pekerjaan Umum

Kabupaten Malinau,

Ir. KRISTIAN MUNED, MT

NIP. 19651228 199603 1 002

2

ALAT

DAFTAR HARGA SATUAN DASAR PERALATAN

TAHUN ANGGARAN 2014

KABUPATEN MALINAU

NO URAIAN KODESATUAN

KOMPONENSATUAN