Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

download Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

of 26

Transcript of Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    1/26

    FORMULIR APLIKASI

    Lomba Gedung Hemat Energi Nasional Tahun 2011

    KATEGORY: RETROFITTED BUILDING

    Batas waktu penyampaian kepada DJEBTKE

    31 Maret 2011

    Direktorat Jenderal Energi Baru Terbarukandan Konservasi Energi

    Kementerian Energi dan Sumber Daya Mineral

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    2/26

    1

    INFORMASI SINGKAT ( NAMA GEDUNG, FOTO, PERUNTUKAN, DLL. )

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    3/26

    2

    PENGHEMATAN ENERGI KESELURUHAN ( DITULIS MAKSIMUM 2 HALAMAN )Disampaikan secara rinci bagaimana penghematan energi dapat dicapai.

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    4/26

    3

    PENGHEMATAN ENERGI KESELURUHAN ( SAMBUNGAN )

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    5/26

    4

    DISAIN AKTIF (DITULIS MAKSIMUM 4 HALAMAN) 1. Tata udara (pemilihan, rancangan sistem dan tata letak): __ kW/ton __ W/m 2;

    2. Sistem Pencahayaan: _ W/m2

    ;

    3. Sistem yang lain (transportasi vertikal, dll.) __W/m 2;

    4. Indoor air quality (kenyamanan termal, ventilasi: _ m 3/hour/orang, etc.);

    - Konsumsi Energi secara keseluruhan per meter persegi dari lantai ber-ac: __ W/m 2;

    - Konsep disain aktif lainnya (bila ada perlu disampaikan di lembar disain aktif) .

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    6/26

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    7/26

    7

    DISAIN AKTIF (SAMBUNGAN)

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    8/26

    8

    DISAIN AKTIF (SAMBUNGAN)

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    9/26

    9

    DISAIN PASIF (DITULIS MAKSIMUM 4 HALAMAN)1. Orientasi dan Rancangan Gedung (orientasi gedung, bentuk gedung (surface area to gross

    floor area ratio), lokasi area servis, letak jalan masuk/pintu, lansekap gedung, ruang untukaneka fungsi, dll.);

    2. Disain Selubung Bangunan (bahan, peneduh, fenestrasi, dll.);

    3. Bahan Bangunan (perlindungan terhadap perpindahan panas, perlindungan terhadapkelembaban, MRT effect , warna selubung bangunan, perlindungan dan pengendalianterhadap infiltrasi, dll.);

    4. Peneduh (efisiensi peralatan peneduh, penggunaan peralatan peneduh yangefisien,penggunaan peneduh dari bangunan di sebelahnya, dll.);

    5. Fenestrasi (Disain Fenestrasi: lokasi, besar bukaan yang alami, cahaya, solar heat gain ratio

    (LT/SC), etc.);

    6. OTTV & RTTV: wall _ W/m 2; Roof _ W/m 2;

    7. Pencahayaan Alami (penggunaan diffuse radiation di dalam gedung seperti di hall, atrium,koridor, tempat parkir, toilet, dll., zoning for integrated lighting and daylighting , contrast ratioof brightness );

    8. Ventilasi Alami;

    9. Konsep disain pasif lainnya.

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    10/26

    10

    DISAIN PASIF (SAMBUNGAN)

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    11/26

    11

    DISAIN PASIF (SAMBUNGAN)

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    12/26

    12

    DISAIN PASIF (SAMBUNGAN)

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    13/26

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    14/26

    14

    PERAWATAN DAN PENGELOLAAN(SAMBUNGAN)

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    15/26

    15

    PERAWATAN DAN PENGELOLAAN(SAMBUNGAN)

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    16/26

    16

    PERAWATAN DAN PENGELOLAAN(SAMBUNGAN)

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    17/26

    17

    DAMPAK TERHADAP LINGKUNGAN(1 HALAMAN)

    - waste management;- pollution management (air, noise, visual, exhaust, etc.);

    - green/non-toxic materials;

    - others (specify).

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    18/26

    18

    INFORMASI GEDUNG (DIISI RINCI MAKSIMUM 4 HALAMAN)

    A. General Information

    1. Name of the building:2. Name of owner and management company:3. Address:4. Tel. No./Fax No./E-mail address:

    B. Building Physical Information

    5. Physical building background

    - Brief history- Single function usage or mix function usage (specify)

    6. Age of building7. Any retrofit done? When? What?8. Total number of storeys9. Total number of basement floor 10. Number of car park storeys

    11. Total gross floor area12. Surface area of the envelope including the roof to gross floor area ratio13. Car park area14. Gross lettable area15. Air-conditioned area16. Non-air conditioned area17. Plot ratio (total GFA / ground area)

    C. Building Design and Practice Information

    18. Plants and landscape design/ wind and natural ventilation/ water features/daylighting/ etc.

    19. Facade and shading design:- Type of faade- Color of faade

    - Use of shading devices

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    19/26

    19

    INFORMASI GEDUNG (SAMBUNGAN)

    20.Location of service core21.Shape of building22.Overall heat transfer through building envelope:

    Wall .. W/m 2; Roof .. W/m 2

    23.Lighting fixtures24.Lighting load* .. W/m 2 (gross floor area)25.Building air-conditioner system and equipment

    Fresh air exchange rate: .......... .. .. m 3/hour/person.............. m 3/hour/m 2

    .............. m 3/hour Energy efficiency of aircon chiller: .. kW/ton

    26.Cooling Load .. W/m 2 (air-conditioned area)

    D. Operation Information

    27. Occupancy rate (year 2001): Minimum .. % of total area28. Total number of occupants29. Ownership of building (occupied by owner(s), renter(s), etc.)

    30. Building operating schedule- weekdays from _______________ to _______________ - Saturday from _______________ to _______________ - Sunday from _______________ to _______________ - Operating hours/ yr ________

    31. Building indoor environment: Indoor air quality setting: temperature and RH

    E. Energy Consumption Information

    32. Peak demand (monthly)33. Energy used (monthly)34. Typical Load curve (weekdays, weekends)35. Energy efficiency index*: air-conditioned area ______ kWh/m 2/yr

    (based on 2,000 operational hours/yr)36. Energy consumption: Electricity ________ kWh/m 2/yr

    (based on 2,000 operational hours/yr)- Fuel ________ Liters/yr (not for electricity generation)

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    20/26

    20

    INFORMASI GEDUNG (SAMBUNGAN)

    F. Energy Management Information

    37. Building energy management system Connected physical points _______ (no)

    38. Energy saving: Schedule programme ______ kWh/yr Duty cycle programme ______ kWh/yr Optimum start / stop programme ______ kWh/yr Power demand programme ______ kW (mean)

    G. Maintenance Information

    39. Maintenance programme- Manpower: ________ man-hr/yr - Maintenance contractor - Availability of energy management engineer - Training of maintenance workers: _____________ cumulative

    hours/yr.

    H. Environmental Impacts

    40. Impacts of waste41. Impacts of pollution (air, noise, visual, exhaust, etc.)

    I. Additional Information for Retrofitted Buildings

    42. Energy savings in air-conditioned area* _______ kWh/m 2/yr (based on2,000 operational hours/year

    43. Energy savings in lighting systems* _________ kWh/m 2/yr (based on 2,000

    operational hours/year)44. Retrofitted area*: _________ % of total area

    * - mentioned in the pre-qualification criteria

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    21/26

    21

    GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT,ROOF PLAN, AND VERTICAL CROSS SECTION - MAKSIMUM 4 HALAMAN )

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    22/26

    22

    GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT,ROOF PLAN, AND VERTICAL CROSS SECTION - MAKSIMUM 4 HALAMAN )

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    23/26

    23

    GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT,ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN )

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    24/26

    24

    GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT,ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN )

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    25/26

    25

    GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT,ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN )

  • 7/27/2019 Formulir Aplikasi Kategori Retrofitted Building 2011 (Final) (1)

    26/26

    26

    GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT,ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN )