PEMERINTAH KABUPATEN .................................... .......................................................................... ..........................., - Kabupaten .................................... LAPORAN HARIAN KEGIATAN : ...................................... H A R I 01 Juli 2012 PEKERJAAN : ..................................... TANGGAL 01 Juli 2012 KONTRAKTOR PELAKSANA : ................................... MINGGU KE 2 LOKASI : ................................... BULAN 2 TAHUN ANGGARAN : ...................... JUMLAH BAHAN / ALAT YANG DIPAKAI / DIDATANGKAN NO. TENAGA KERJA PAGI SIANG ALAT YANG DIGUNAKAN UNIT KUALITAS TYPE / MEREK TERIMA TOLAK ALASAN 1 Site Manager 1 1 EXCAVATOR 2 2 Pelaksana Lapangan BULLDOZER 1 3 Logistik 1 1 MOTOR GRADER 0 4 Surveyor 1 1 VIBRATORY ROLLER 1 5 Pembantu surveyor 1 1 DUMP TRUCK 2 6 Mekanik 1 1 COMPRESOR 1 7 Pembantu Mekanik CONCRET MIXER 0 8 Operator 2 2 STAMPER 0 9 Pembantu Operator 2 2 PLAT BAD TRUCK 0 10 S o p i r 2 2 WATER TANK 0 11 Pembantu Sopir CHAIN SAW 2 12 Tukang Masak 1 1 GENSET PENERAGAN 1 13 Tukang Cuci 1 1 GENSET LAS 1 MOTOR 1 BAHAN YANG DIGUNAKAN SATUAN KUALITAS VOLUME TYPE / MEREK TERIMA TOLAK ALASAN NO. MP PEKERJAAN YANG DILAKSANAKAN Satuan VOLUME CAT. PELAKSANAAN 1.2 Mobilisasi Ls 0.000 2.1 Galian untuk Selokan Drainase dan Saluran Air 0.000 3.1 (1) Galian Biasa 0.000 3.2 (1) Timbunan Biasa 0.000 3.2 (2) Timbunan Pilihan 0.000 3.3 Penyiapan Badan Jalan 0.000 3.4 (1) Pembersihan dan Pengupasan Lahan 0.000 CUACA 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18 JUMLAH CERAH 1 1 1 1 1 1 1 1 1 9 MENDUNG GERIMIS HUJAN LEBAT LAIN-LAIN Direksi Lapangan Konsultan Pengawas Kontraktor Pelaksana ............................ .................................... .................................... ..................................... ................................... .................................... .............................. M 3 M 3 M 3 M 3 M 2 M 2 JAM KERJA (W I T) ...................................... ..... ........................................... ...

Transcript of Format Laporan Harian

Page 1: Format Laporan Harian

PEMERINTAH KABUPATEN ....................................

DINAS ................................................................................................................., - Kabupaten ....................................

LAPORAN HARIAN KEGIATAN : ...................................... H A R I 01 Juli 2012

PEKERJAAN : ..................................... TANGGAL 01 Juli 2012

KONTRAKTOR PELAKSANA : ................................... MINGGU KE 2

LOKASI : ................................... BULAN 2

TAHUN ANGGARAN : ......................

JUMLAH BAHAN / ALAT YANG DIPAKAI / DIDATANGKAN

NO. TENAGA KERJAPAGI SIANG ALAT YANG DIGUNAKAN UNIT

KUALITAS

TYPE / MEREK TERIMA TOLAK ALASAN

1 Site Manager 1 1 EXCAVATOR 2

2 Pelaksana Lapangan BULLDOZER 1

3 Logistik 1 1 MOTOR GRADER 0

4 Surveyor 1 1 VIBRATORY ROLLER 1

5 Pembantu surveyor 1 1 DUMP TRUCK 2

6 Mekanik 1 1 COMPRESOR 1

7 Pembantu Mekanik CONCRET MIXER 0

8 Operator 2 2 STAMPER 0

9 Pembantu Operator 2 2 PLAT BAD TRUCK 0

10 S o p i r 2 2 WATER TANK 0

11 Pembantu Sopir CHAIN SAW 2

12 Tukang Masak 1 1 GENSET PENERAGAN 1

13 Tukang Cuci 1 1 GENSET LAS 1

MOTOR 1

BAHAN YANG DIGUNAKAN SATUANKUALITAS VOLUME

TYPE / MEREK TERIMA TOLAK ALASAN

NO. MP PEKERJAAN YANG DILAKSANAKAN Satuan VOLUME CAT. PELAKSANAAN

1.2 Mobilisasi Ls 0.000

2.1 Galian untuk Selokan Drainase dan Saluran Air 0.000

3.1 (1) Galian Biasa 0.000

3.2 (1) Timbunan Biasa 0.000

3.2 (2) Timbunan Pilihan 0.000

3.3 Penyiapan Badan Jalan 0.000

3.4 (1) Pembersihan dan Pengupasan Lahan 0.000

CUACA

07

-08

08

-09

09

-10

10

-11

11

-12

12

-13

13

-14

14

-15

15

-16

16

-17

17

-18

JU

ML

AH

CERAH 1 1 1 1 1 1 1 1 1 9

MENDUNG

GERIMIS

HUJAN LEBAT

LAIN-LAIN

Direksi Lapangan Konsultan Pengawas Kontraktor Pelaksana............................ .................................... ....................................

..................................... ........................................... ................................................................................. .................................... ..............................

M3

M3

M3

M3

M2

M2

JAM KERJA (W I T)