Format Laporan bulanan
-
Upload
wisnugraha -
Category
Documents
-
view
18 -
download
0
description
Transcript of Format Laporan bulanan
PROGRES FISIK BULANANSATUAN KERJA SEMENTARA BRR-INFRASTRUKTUR KAWASAN DAN PERMUKIMAN NAD
NAMA PAKET : PRASARANA DASAR PERMUKIMAN KAWASAN GAMPONG BLANG-LAMJABAT LAPORAN BULAN :NO./KODE PAKET : IKP-I.1.1 LAPORAN NOMOR :KONTRAKTOR : PT.YUDHA BAKTI UTAMA RENCANA PROGRESS S/D BULAN INI :LOKASI : PROVINSI NANGGROE ACEH DARUSSALAM REALISASI PROGRESS S/D BULAN INI :
DEVIASI :
ITEM U R A I A N SAT.KONTRAK AWAL PROGRES FISIK BULANAN VOLUMEHARGA
SATUANVOLUME BOBOT (%)
S/D BULAN LALU BULAN INI S/D BULAN INI TERHADAP KET.( Rp. ) VOLUME JUMLAH HARGA BOBOT % VOLUME JUMLAH HARGA BOBOT % VOLUME JUMLAH HARGA BOBOT % KONTRAK (%)
A. PEKERJAAN JALANI DIVISI 1. U M U M
1.2 Mobilisasi Ls 86,930,000.00 1.00 1.118II DIVISI 3. PEKERJAAN TANAH
3.1 (1) Galian Biasa 36,754.55 608.12 0.2873.2 (1) Timbunan Biasa 113,362.83 2,871.50 4.1853.2 (2) Timbunan Pilihan 52,228.29 9,080.50 6.097
3.3 Penyiapan Badan Jalan 2,838.48 19,250.00 0.703III DIVISI 5. PERKERASAN BERBUTIR
5.1 (1) Lapis Pondasi Agregat Kelas A 335,288.11 2,100.00 9.0535.1 (2) Lapis Pondasi Agregat Kelas B 276,079.11 2,800.00 9.939
IV DIVISI 6. PERKERASAN ASPAL6.1 (1) Lapis Resap Pengikat Ltr 8,160.54 21,175.00 2.2226.3 (6) Laston-Lapis Pengikat Aspal beton (AC BC) tebal = 5 cm 1,665,208.06 700.00 14.9866.6 Lapis Penetrasi Macadam ( Permukaan ) 1,105,898.34 367.50 5.225V DIVISI 7. STRUKTUR
7.9 Pasangan Batu 525,804.16 661.00 4.468VI DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR8.4 (1) Marka Jalan Bukan Thermoplastic 118,629.50 313.63 0.478
SUB TOTAL
B. PEKERJAAN DRAINASE1 Galian Tanah 24,237.50 9,329.71 2.9072 Urugan Pasir 93,695.00 1,320.44 1.5913 Pekerjaan Saluran Batu Belah 510,346.00 1,225.44 8.0414 Plesteran 24,583.80 2,376.55 0.7515 Pekerjaan Saluran Beton 649,447.98 573.25 4.7876 Acian 7,524.00 11,105.71 1.0747 Kerb 101,816.50 1,057.50 1.3848 Paving Block 79,913.40 1,109.00 1.1399 Suling-suling 5,134.25 1,959.00 0.129
10 Beton Penutup Saluran 2,450,230.00 184.50 5.81211 Begisting Tutup Saluran 69,657.50 36.37 0.033
SUB TOTAL
C. PEKERJAAN AIR BERSIHI PEKERJAAN PERSIAPAN1 Mobilisasi dan Demobilisasi Ls 2,000,000.00 2.00 0.0512 Pengukuran dan Pematokan Ls 1,000,000.00 2.00 0.026II PEMASANGAN PIPA DAN ACCESSORIES1 ND. 100 MM M 17,174.65 780.00 0.1722 ND. 75 MM M 14,347.24 546.00 0.1013 ND. 50 MM M 13,717.06 2,950.00 0.5204 ND. 40 MM M 11,435.06 4,929.00 0.725III PENGETESAN PIPA1 ND. 100 MM M 1,255.00 780.00 0.0132 ND. 75 MM M 1,013.00 546.00 0.0073 ND. 50 MM M 784.00 2,950.00 0.0304 ND. 40 MM M 784.00 4,929.00 0.050IV DESINFEKSI PIPA1 ND. 100 MM M 694.00 780.00 0.0072 ND. 75 MM M 545.00 546.00 0.0043 ND. 50 MM M 409.00 2,950.00 0.0164 ND. 40 MM M 409.00 4,929.00 0.026V PEMASANGAN SAMBUNGAN RUMAH1 PEMASANGAN SAMBUNGAN RUMAH M 230,000.00 125.00 0.370VI PEKERJAAN LAIN-LAIN1 AS BUILT DRAWING Ls 200,000.00 2.00 0.005
SUB TOTAL
D. PEKERJAAN AIR KOTOR1 JUMLAH TOTAL PEKERJAAN AIR KOTOR Ls 87,369,122.71 1.00 1.123
SUB TOTAL
E. PEKERJAAN PERSAMPAHAN1 JUMLAH TOTAL PEKERJAAN PERSAMPAHAN Ls 97,881,664.87 1.00 1.258
SUB TOTAL
F. PEKERJAAN LAND SCAPE1 JUMLAH TOTAL PEKERJAAN LAND SCAPE Ls 706,853,127.36 1.00 9.088
SUB TOTAL
J U M L A H 100.00
Mengetahui Diperiksa Oleh Dibuat Oleh
Kepala Satuan Kerja Sementara Konsultan Pengawas Kontraktor Pelaksana
BRR - Infrastruktur Kawasan dan Permukiman NAMA PERUSAHAAN NAMA PERUSAHAAN
N A M A N A M A N A M A
NIP. Team Leader / Co Team Leader General Superintendent
M3
M3
M3
M2
M3
M3
M3
M3
M3
M1
M3
M3
M3
M2
M3
M2
M1
M2
M1
M3
M2