1
PROGRES FISIK BULANAN SATUAN KERJA SEMENTARA BRR-INFRASTRUKTUR KAWASAN DAN PERMUKIMAN NAD NAMA PAKET : PRASARANA DASAR PERMUKIMAN KAWASAN GAMPONG BLANG-LAMJABAT LAPORAN BULAN : NO./KODE PAKET : IKP-I.1.1 LAPORAN NOMOR : KONTRAKTOR : PT.YUDHA BAKTI UTAMA RENCANA PROGRESS S/D BULAN INI : LOKASI : PROVINSI NANGGROE ACEH DARUSSALAM REALISASI PROGRESS S/D BULAN INI : DEVIASI : ITEM U R A I A N SAT. KONTRAK AWAL PROGRES FISIK BULANAN VOLUME HARGA SATUAN VOLUME BOBOT (%) S/D BULAN LALU BULAN INI S/D BULAN INI TERHADAP KET. ( Rp. ) VOLUME JUMLAH HARGA BOBOT % VOLUME JUMLAH HARGA BOBOT % VOLUME JUMLAH HARGA BOBOT % KONTRAK (%) A. PEKERJAAN JALAN I DIVISI 1. U M U M 1.2 Mobilisasi Ls 86,930,000.00 1.00 1.118 II DIVISI 3. PEKERJAAN TANAH 3.1 (1) Galian Biasa 36,754.55 608.12 0.287 3.2 (1) Timbunan Biasa 113,362.83 2,871.50 4.185 3.2 (2) Timbunan Pilihan 52,228.29 9,080.50 6.097 3.3 Penyiapan Badan Jalan 2,838.48 19,250.00 0.703 III DIVISI 5. PERKERASAN BERBUTIR 5.1 (1) Lapis Pondasi Agregat Kelas A 335,288.11 2,100.00 9.053 5.1 (2) Lapis Pondasi Agregat Kelas B 276,079.11 2,800.00 9.939 IV DIVISI 6. PERKERASAN ASPAL 6.1 (1) Lapis Resap Pengikat Ltr 8,160.54 21,175.00 2.222 6.3 (6) Laston-Lapis Pengikat Aspal beton (AC BC) tebal = 5 cm 1,665,208.06 700.00 14.986 6.6 Lapis Penetrasi Macadam ( Permukaan ) 1,105,898.34 367.50 5.225 V DIVISI 7. STRUKTUR 7.9 Pasangan Batu 525,804.16 661.00 4.468 VI DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4 (1) Marka Jalan Bukan Thermoplastic 118,629.50 313.63 0.478 SUB TOTAL B. PEKERJAAN DRAINASE 1 Galian Tanah 24,237.50 9,329.71 2.907 2 Urugan Pasir 93,695.00 1,320.44 1.591 3 Pekerjaan Saluran Batu Belah 510,346.00 1,225.44 8.041 4 Plesteran 24,583.80 2,376.55 0.751 5 Pekerjaan Saluran Beton 649,447.98 573.25 4.787 6 Acian 7,524.00 11,105.71 1.074 7 Kerb 101,816.50 1,057.50 1.384 8 Paving Block 79,913.40 1,109.00 1.139 9 Suling-suling 5,134.25 1,959.00 0.129 10 Beton Penutup Saluran 2,450,230.00 184.50 5.812 11 Begisting Tutup Saluran 69,657.50 36.37 0.033 SUB TOTAL C. PEKERJAAN AIR BERSIH I PEKERJAAN PERSIAPAN 1 Mobilisasi dan Demobilisasi Ls 2,000,000.00 2.00 0.051 2 Pengukuran dan Pematokan Ls 1,000,000.00 2.00 0.026 II PEMASANGAN PIPA DAN ACCESSORIES 1 ND. 100 MM M 17,174.65 780.00 0.172 2 ND. 75 MM M 14,347.24 546.00 0.101 3 ND. 50 MM M 13,717.06 2,950.00 0.520 4 ND. 40 MM M 11,435.06 4,929.00 0.725 III PENGETESAN PIPA 1 ND. 100 MM M 1,255.00 780.00 0.013 2 ND. 75 MM M 1,013.00 546.00 0.007 3 ND. 50 MM M 784.00 2,950.00 0.030 4 ND. 40 MM M 784.00 4,929.00 0.050 IV DESINFEKSI PIPA 1 ND. 100 MM M 694.00 780.00 0.007 2 ND. 75 MM M 545.00 546.00 0.004 3 ND. 50 MM M 409.00 2,950.00 0.016 4 ND. 40 MM M 409.00 4,929.00 0.026 V PEMASANGAN SAMBUNGAN RUMAH 1 PEMASANGAN SAMBUNGAN RUMAH M 230,000.00 125.00 0.370 VI PEKERJAAN LAIN-LAIN 1 AS BUILT DRAWING Ls 200,000.00 2.00 0.005 SUB TOTAL D. PEKERJAAN AIR KOTOR 1 JUMLAH TOTAL PEKERJAAN AIR KOTOR Ls 87,369,122.71 1.00 1.123 SUB TOTAL E. PEKERJAAN PERSAMPAHAN 1 JUMLAH TOTAL PEKERJAAN PERSAMPAHAN Ls 97,881,664.87 1.00 1.258 SUB TOTAL F. PEKERJAAN LAND SCAPE 1 JUMLAH TOTAL PEKERJAAN LAND SCAPE Ls 706,853,127.36 1.00 9.088 SUB TOTAL J U M L A H 100.00 Mengetahui Diperiksa Oleh Dibuat Oleh Kepala Satuan Kerja Sementara Konsultan Pengawas Kontraktor Pelaksana BRR - Infrastruktur Kawasan dan Permukiman NAMA PERUSAHAAN NAMA PERUSAHAAN N A M A N A M A N A M A NIP. Team Leader / Co Team Leader General Superintendent M 3 M 3 M 3 M 2 M 3 M 3 M 3 M 3 M 3 M 1 M 3 M 3 M 3 M 2 M 3 M 2 M 1 M 2 M 1 M 3 M 2

description

sipil

Transcript of Format Laporan bulanan

Page 1: Format Laporan bulanan

PROGRES FISIK BULANANSATUAN KERJA SEMENTARA BRR-INFRASTRUKTUR KAWASAN DAN PERMUKIMAN NAD

NAMA PAKET : PRASARANA DASAR PERMUKIMAN KAWASAN GAMPONG BLANG-LAMJABAT LAPORAN BULAN :NO./KODE PAKET : IKP-I.1.1 LAPORAN NOMOR :KONTRAKTOR : PT.YUDHA BAKTI UTAMA RENCANA PROGRESS S/D BULAN INI :LOKASI : PROVINSI NANGGROE ACEH DARUSSALAM REALISASI PROGRESS S/D BULAN INI :

DEVIASI :

ITEM U R A I A N SAT.KONTRAK AWAL PROGRES FISIK BULANAN VOLUMEHARGA

SATUANVOLUME BOBOT (%)

S/D BULAN LALU BULAN INI S/D BULAN INI TERHADAP KET.( Rp. ) VOLUME JUMLAH HARGA BOBOT % VOLUME JUMLAH HARGA BOBOT % VOLUME JUMLAH HARGA BOBOT % KONTRAK (%)

A. PEKERJAAN JALANI DIVISI 1. U M U M

1.2 Mobilisasi Ls 86,930,000.00 1.00 1.118II DIVISI 3. PEKERJAAN TANAH

3.1 (1) Galian Biasa 36,754.55 608.12 0.2873.2 (1) Timbunan Biasa 113,362.83 2,871.50 4.1853.2 (2) Timbunan Pilihan 52,228.29 9,080.50 6.097

3.3 Penyiapan Badan Jalan 2,838.48 19,250.00 0.703III DIVISI 5. PERKERASAN BERBUTIR

5.1 (1) Lapis Pondasi Agregat Kelas A 335,288.11 2,100.00 9.0535.1 (2) Lapis Pondasi Agregat Kelas B 276,079.11 2,800.00 9.939

IV DIVISI 6. PERKERASAN ASPAL6.1 (1) Lapis Resap Pengikat Ltr 8,160.54 21,175.00 2.2226.3 (6) Laston-Lapis Pengikat Aspal beton (AC BC) tebal = 5 cm 1,665,208.06 700.00 14.9866.6 Lapis Penetrasi Macadam ( Permukaan ) 1,105,898.34 367.50 5.225V DIVISI 7. STRUKTUR

7.9 Pasangan Batu 525,804.16 661.00 4.468VI DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR8.4 (1) Marka Jalan Bukan Thermoplastic 118,629.50 313.63 0.478

SUB TOTAL

B. PEKERJAAN DRAINASE1 Galian Tanah 24,237.50 9,329.71 2.9072 Urugan Pasir 93,695.00 1,320.44 1.5913 Pekerjaan Saluran Batu Belah 510,346.00 1,225.44 8.0414 Plesteran 24,583.80 2,376.55 0.7515 Pekerjaan Saluran Beton 649,447.98 573.25 4.7876 Acian 7,524.00 11,105.71 1.0747 Kerb 101,816.50 1,057.50 1.3848 Paving Block 79,913.40 1,109.00 1.1399 Suling-suling 5,134.25 1,959.00 0.129

10 Beton Penutup Saluran 2,450,230.00 184.50 5.81211 Begisting Tutup Saluran 69,657.50 36.37 0.033

SUB TOTAL

C. PEKERJAAN AIR BERSIHI PEKERJAAN PERSIAPAN1 Mobilisasi dan Demobilisasi Ls 2,000,000.00 2.00 0.0512 Pengukuran dan Pematokan Ls 1,000,000.00 2.00 0.026II PEMASANGAN PIPA DAN ACCESSORIES1 ND. 100 MM M 17,174.65 780.00 0.1722 ND. 75 MM M 14,347.24 546.00 0.1013 ND. 50 MM M 13,717.06 2,950.00 0.5204 ND. 40 MM M 11,435.06 4,929.00 0.725III PENGETESAN PIPA1 ND. 100 MM M 1,255.00 780.00 0.0132 ND. 75 MM M 1,013.00 546.00 0.0073 ND. 50 MM M 784.00 2,950.00 0.0304 ND. 40 MM M 784.00 4,929.00 0.050IV DESINFEKSI PIPA1 ND. 100 MM M 694.00 780.00 0.0072 ND. 75 MM M 545.00 546.00 0.0043 ND. 50 MM M 409.00 2,950.00 0.0164 ND. 40 MM M 409.00 4,929.00 0.026V PEMASANGAN SAMBUNGAN RUMAH1 PEMASANGAN SAMBUNGAN RUMAH M 230,000.00 125.00 0.370VI PEKERJAAN LAIN-LAIN1 AS BUILT DRAWING Ls 200,000.00 2.00 0.005

SUB TOTAL

D. PEKERJAAN AIR KOTOR1 JUMLAH TOTAL PEKERJAAN AIR KOTOR Ls 87,369,122.71 1.00 1.123

SUB TOTAL

E. PEKERJAAN PERSAMPAHAN1 JUMLAH TOTAL PEKERJAAN PERSAMPAHAN Ls 97,881,664.87 1.00 1.258

SUB TOTAL

F. PEKERJAAN LAND SCAPE1 JUMLAH TOTAL PEKERJAAN LAND SCAPE Ls 706,853,127.36 1.00 9.088

SUB TOTAL

J U M L A H 100.00

Mengetahui Diperiksa Oleh Dibuat Oleh

Kepala Satuan Kerja Sementara Konsultan Pengawas Kontraktor Pelaksana

BRR - Infrastruktur Kawasan dan Permukiman NAMA PERUSAHAAN NAMA PERUSAHAAN

N A M A N A M A N A M A

NIP. Team Leader / Co Team Leader General Superintendent

M3

M3

M3

M2

M3

M3

M3

M3

M3

M1

M3

M3

M3

M2

M3

M2

M1

M2

M1

M3

M2