Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015

download Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015

of 6

Transcript of Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015

  • 8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015

    1/6

    SUMMARY BOBOT PEKERJAAN

    PAKET A1 NO.1 (STEEL STRUCTURE MAIN BUILDING )

    PAKET A1 NO.2 (CIVIL STEEL STRUCTURE + CONCRETE WALL LOADING RA

    Up Dat Ta!""a# $ 1% J' 21

    NO. ITEM PEKERJAAN

    A PEKERJAAN PERSIAPAN PAKET A1 (NO.1 & NO.2) Rp 202,063,400

    B

    1. PEKERJAAN CIVIL MAIN BUILDIN Rp !23,!60,"#"

    2. PEKERJAAN CIVIL CONCRETE $ALL LOADIN RAMP Rp 24%,"0",636

    C PEKERJAAN PAKET A1 NO.1 (STEEL STRUCTURE MAIN BUILDIN)

    1. PEKERJAAN STRUKTUR DI MAIN BUILDIN Rp 1,!34,230,#10

    2. PEKERJAAN ATAP & DINDIN  Rp 2,0#3,"61,4#0

    3. PEKERJAAN INIS'IN Rp 241,61",400

    4. PERLENKAPAN DAN TRANSPORTASI Rp 2#2,#00,000

    TOTAL * (A+B+C) Rp ,-,11%

    TOTAL BIAYAPEKERJAAN

    PEKERJAAN PAKET A1 NO.2 (CIVIL STEEL STRUCTURE CONCRETE $ALL LOADINRAMP )

  • 8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015

    2/6

     

    MP )

    /0' 3!ta!

    BOBOT KONTRAK 

    3.4# 1.4!

    1#."% 3.26

    4.2# 1."!

    33.03 3.62

    3#.0" 0.14

    4.13 0.00

    4.31 0.00

    1.4 1.%14

    BOBOTPROGRESS

  • 8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015

    3/6

    NO URAIAN VOLUME TOTAL

     5ARGASATUAN

    PEKERJAAN(Rp.)

     JUMLA5 5ARGAPEKERJAAN

    (Rp.)

    1*A STERILI+ER STATION BUILDIN

    1 T-/ K B-/-

    $ 200100#,#% #,24%.00 5/ 16,#00 %6,#!2,000

    2 R-789 :-/-$ 200100#,#% 13,0#4.00 5/ 16,#00 21#,3!1,000

    3 R-789 ;-/

    $ 200100#,#% "6%.00 5/ 16,#00 12,6"2,000

    4 R-789 C M- B;/

    $ 200100#,#% "6%.00 5/ 16,#00 12,6"2,000

    # C-p<

    $ 1#0"##" 1,#12.00 5/ 16,#00 24,!4%,000

    6 T:-5 L-   "#0 1,!14,000

    * R-/8 1@2 2,##2.00 p=>   "#0 1,!14,000

    % J7 R-789 C7 O 

    $ 200100#,#% 2,6%%.00 5/ 16,#00 44,3#2,000! J7 R-789 C7 O 

    $ 1#0"##" #04.00 5/ 16,#00 %,316,000

    10T8 B8-

    $ 1#0"##" 3,6!6.00 5/ 16,#00 60,!%4,000

    11 C98- 79->89 C-99-/8

    - $ 12# 60 6 % 1,26".20 5/ 16,#00 20,!0%,%00

    : L 60 60 # 4%".%0 5/ 1#,#00 ",#60,!00

    = MS P-78 10 #1.#2 5/ 1#,#00 "!%,#60

  • 8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015

    4/6

    NO URAIAN VOLUME TOTAL

     5ARGASATUAN

    PEKERJAAN(Rp.)

     JUMLA5 5ARGAPEKERJAAN

    (Rp.)

    12 C98- Tpp89 A98-

    - $ 12# 60 6 % 633.60 5/ 16,#00 10,4#4,400

    : L 60 60 # 260.16 5/ 1#,#00 4,032,4%0

    = MS P-78 10 2#."6 5/ 16,000 412,16013 J-=59@79

    - UNP 100 #0 # 43#.41 5/ 16,000 6,!66,#60

    : S5 40404 "#6.00 5/ 16,#00 12,4"4,000

    14 P8589-- >>87 & S7889 P-78, MS PL 10 2,224.36 5/ 16,000 3#,#%!,"60

    1# P8589-- B->8 p-78, MS PL 14 2"".#% 5/ 16,#00 4,#%0,0"0

    16 B-7 ;- M9

    - #@% 2 =@ ->F89 p-78 #2%.00 p=> 6,000 3,16%,000

    : 3@4 2 1@2 =@ ->F89 p-78 %60.00 p=> ",#00 6,4#0,000

  • 8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015

    5/6

     BOBOTPEKERJAAN(KONTRAK)

    ESTIMASIBOBOT LAP.

    ESTIMASIBOBOT BIAYAPEKERJAAN

    (Rp.)

    BOBOTPEKERJAAN

    (LAP.)

    1.4% #0 43,2!6,000 0."4

    3.6% #0 10",6!#,#00 1.%4

    0.22 #0 6,336,000 0.11

    0.22 #0 6,336,000 0.11

    0.43

    0.22 #0 6,336,000 0.11

    6.41

    0.14

    0.1"

    0.1"

    0.03

    0.03

    0."6 #0 22,1"6,000 0.3%

    0.14

    1.04

    0.36

    0.13

    0.01

  • 8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015

    6/6

     BOBOTPEKERJAAN(KONTRAK)

    ESTIMASIBOBOT LAP.

    ESTIMASIBOBOT BIAYAPEKERJAAN

    (Rp.)

    BOBOTPEKERJAAN

    (LAP.)

    0.1%

    0.0"

    0.01

    0.12

    0.21

    0.61 #0 1","!4,%%0 0.30

    0.0% #0 2,2!0,03# 0.04

    0.0#

    0.11