SUMMARY BOBOT PEKERJAAN
PAKET A1 NO.1 (STEEL STRUCTURE MAIN BUILDING )
PAKET A1 NO.2 (CIVIL STEEL STRUCTURE + CONCRETE WALL LOADING RA
Up Dat Ta!""a# $ 1% J' 21
NO. ITEM PEKERJAAN
A PEKERJAAN PERSIAPAN PAKET A1 (NO.1 & NO.2) Rp 202,063,400
B
1. PEKERJAAN CIVIL MAIN BUILDIN Rp !23,!60,"#"
2. PEKERJAAN CIVIL CONCRETE $ALL LOADIN RAMP Rp 24%,"0",636
C PEKERJAAN PAKET A1 NO.1 (STEEL STRUCTURE MAIN BUILDIN)
1. PEKERJAAN STRUKTUR DI MAIN BUILDIN Rp 1,!34,230,#10
2. PEKERJAAN ATAP & DINDIN Rp 2,0#3,"61,4#0
3. PEKERJAAN INIS'IN Rp 241,61",400
4. PERLENKAPAN DAN TRANSPORTASI Rp 2#2,#00,000
TOTAL * (A+B+C) Rp ,-,11%
TOTAL BIAYAPEKERJAAN
PEKERJAAN PAKET A1 NO.2 (CIVIL STEEL STRUCTURE CONCRETE $ALL LOADINRAMP )
-
8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015
2/6
MP )
/0' 3!ta!
BOBOT KONTRAK
3.4# 1.4!
1#."% 3.26
4.2# 1."!
33.03 3.62
3#.0" 0.14
4.13 0.00
4.31 0.00
1.4 1.%14
BOBOTPROGRESS
-
8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015
3/6
NO URAIAN VOLUME TOTAL
5ARGASATUAN
PEKERJAAN(Rp.)
JUMLA5 5ARGAPEKERJAAN
(Rp.)
1*A STERILI+ER STATION BUILDIN
1 T-/ K B-/-
$ 200100#,#% #,24%.00 5/ 16,#00 %6,#!2,000
2 R-789 :-/-$ 200100#,#% 13,0#4.00 5/ 16,#00 21#,3!1,000
3 R-789 ;-/
$ 200100#,#% "6%.00 5/ 16,#00 12,6"2,000
4 R-789 C M- B;/
$ 200100#,#% "6%.00 5/ 16,#00 12,6"2,000
# C-p<
$ 1#0"##" 1,#12.00 5/ 16,#00 24,!4%,000
6 T:-5 L- "#0 1,!14,000
* R-/8 1@2 2,##2.00 p=> "#0 1,!14,000
% J7 R-789 C7 O
$ 200100#,#% 2,6%%.00 5/ 16,#00 44,3#2,000! J7 R-789 C7 O
$ 1#0"##" #04.00 5/ 16,#00 %,316,000
10T8 B8-
$ 1#0"##" 3,6!6.00 5/ 16,#00 60,!%4,000
11 C98- 79->89 C-99-/8
- $ 12# 60 6 % 1,26".20 5/ 16,#00 20,!0%,%00
: L 60 60 # 4%".%0 5/ 1#,#00 ",#60,!00
= MS P-78 10 #1.#2 5/ 1#,#00 "!%,#60
-
8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015
4/6
NO URAIAN VOLUME TOTAL
5ARGASATUAN
PEKERJAAN(Rp.)
JUMLA5 5ARGAPEKERJAAN
(Rp.)
12 C98- Tpp89 A98-
- $ 12# 60 6 % 633.60 5/ 16,#00 10,4#4,400
: L 60 60 # 260.16 5/ 1#,#00 4,032,4%0
= MS P-78 10 2#."6 5/ 16,000 412,16013 J-=59@79
- UNP 100 #0 # 43#.41 5/ 16,000 6,!66,#60
: S5 40404 "#6.00 5/ 16,#00 12,4"4,000
14 P8589-- >>87 & S7889 P-78, MS PL 10 2,224.36 5/ 16,000 3#,#%!,"60
1# P8589-- B->8 p-78, MS PL 14 2"".#% 5/ 16,#00 4,#%0,0"0
16 B-7 ;- M9
- #@% 2 =@ ->F89 p-78 #2%.00 p=> 6,000 3,16%,000
: 3@4 2 1@2 =@ ->F89 p-78 %60.00 p=> ",#00 6,4#0,000
-
8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015
5/6
BOBOTPEKERJAAN(KONTRAK)
ESTIMASIBOBOT LAP.
ESTIMASIBOBOT BIAYAPEKERJAAN
(Rp.)
BOBOTPEKERJAAN
(LAP.)
1.4% #0 43,2!6,000 0."4
3.6% #0 10",6!#,#00 1.%4
0.22 #0 6,336,000 0.11
0.22 #0 6,336,000 0.11
0.43
0.22 #0 6,336,000 0.11
6.41
0.14
0.1"
0.1"
0.03
0.03
0."6 #0 22,1"6,000 0.3%
0.14
1.04
0.36
0.13
0.01
-
8/18/2019 Estimasi Bobot Pekerjaan Sub Kontraktor 13 Juli 2015
6/6
BOBOTPEKERJAAN(KONTRAK)
ESTIMASIBOBOT LAP.
ESTIMASIBOBOT BIAYAPEKERJAAN
(Rp.)
BOBOTPEKERJAAN
(LAP.)
0.1%
0.0"
0.01
0.12
0.21
0.61 #0 1","!4,%%0 0.30
0.0% #0 2,2!0,03# 0.04
0.0#
0.11