    No. Nama Alat harga satuan($) jumlah harga sub total($)

    1 Tanki penyimpan tetes 5,105,770 3 15,317,310

    2 Tanki umpan tetes 129,348 4 517,392

    3 Tanki Asam 4,616 1 4,616

    4 Mixing & sterilz, tank 255,290 1 255,2905 Mash steril storage 285,925 2 571,850

    6 Fermentor 428,886 3 1,286,658

    7 Beer tank 76,586 1 76,586

    8 Fusel oil storage] 22,977 2 45,954

    9 Beer column 395,053 1 395,053

    10 Aldehide column 74,396 1 74,396

    11 Exhausting column 309,981 1 309,981

    12 Rectifying column 517,151 1 517,151

    13 Beer preheater 17,910 1 17,910

    14 Condenser I 17,222 2 34,444

    15 Condenser II 6,889 1 6,889

    16 Side stream cooler I 13,777 1 13,777

    17 Side stream cooler II 689 1 689

    18 fusel oil cooler 8,611 2 17,222

    19 pompa tetes 8,473 1 8,473

    20 pompa molases transfer 3,841 1 3,841

    21 Pompa mash steril 3,841 1 3,841

    22 Pompa transfer 1,757 1 1,757

    23 Pompa Beer 5,126 1 5,126

    24 pompa reflux I 2,239 1 2,239

    25 Pompa reflux II 2,411 1 2,41126 Pompa reflux III 2,928 1 2,928

    No peralatan utilitas

    1 rak 587,323 2 1,174,646

    2 boiler 255,217 2 510,434

    3 transformator 17,855 2 35,710

    4 pompa air 5,032 12 60,384

    5 tanki floculator 79,118 1 79,118

    6 saringan pasir 30,626 1 30,626

    7 ion exchanger 17,118 3 51,354

    8 bak penampung air pendingin 96,976 1 96,9769 cooling tower 17,118 1 17,118

    1995

  • 7/28/2019 ekotekQ (2)

    2/10

    harga sub total($) harga sub total(rupiah)

    17,486,992 170,235,870,907

    590,680 5,750,270,623

    5,270 51,302,009

    291,452 2,837,281,186652,852 6,355,514,302

    1,468,912 14,299,857,167

    87,434 851,173,242

    52,463 510,730,619

    451,012 4,390,600,667

    84,934 826,833,684

    353,890 3,445,114,416

    590,405 5,747,592,160

    20,447 199,050,907

    39,323 382,809,014

    7,865 76,564,026

    15,728 153,116,937

    787 7,657,514

    19,661 191,404,507

    9,673 94,168,528

    4,385 42,688,695

    4,385 42,688,695

    2,006 19,527,216

    5,852 56,970,126

    2,556 24,884,142

    2,753 26,795,7423,343 32,541,656

    1,341,033 13,054,961,009

    582,736 5,672,939,735

    40,768 396,879,279

    68,937 671,104,967

    90,325 879,313,772

    34,964 340,375,940

    58,628 570,745,967

    110,713 1,077,786,75319,543 190,248,656

    TOTAL 239,507,364,767

    2013

    Nilai tukar rupiah per 1 dolar

    9735

  • 7/28/2019 ekotekQ (2)

    3/10

    indeks harga tahun 1995

    331.1

    indeks harga tahun 2013

    378

    indeks harga tahun 2013 / indeks harga tahun 1995

    1.141649049

  • 7/28/2019 ekotekQ (2)

    4/10

    No. Nama Alat harga sub total($)

    1 Tanki penyimpan tetes 17,486,992

    2 Tanki umpan tetes 590,680

    3 Tanki Asam 5,270

    4 Mixing & sterilz, tank 291,452

    5 Mash steril storage 652,852

    6 Fermentor 1,468,912

    7 Beer tank 87,434

    8 Fusel oil storage] 52,463

    9 Beer column 451,012

    10 Aldehide column 84,93411 Exhausting column 353,890

    12 Rectifying column 590,405

    13 Beer preheater 20,447

    14 Condenser I 39,323

    15 Condenser II 7,865

    16 Side stream cooler I 15,728

    17 Side stream cooler II 787

    18 fusel oil cooler 19,661

    19 pompa tetes 9,673

    20 pompa molases transfer 4,385

    21 Pompa mash steril 4,385

    22 Pompa transfer 2,00623 Pompa Beer 5,852

    24 pompa reflux I 2,556

    25 Pompa reflux II 2,753

    26 Pompa reflux III 3,343

    Total Harga Alat

    Harga FOB

    No. Item Persen

    1 Ongkos Kirim 10

    2 Pajak 10

    3 Asuransi 20Total

    Harga Sampai di Pabrik

    No. Item

    1 Harga dari Toko

    2 Harga FOB

    Total

    Tah

  • 7/28/2019 ekotekQ (2)

    5/10

    No peralatan utilitas harga sub total($)

    1 rak 1,341,033

    2 boiler 582,736

    3 transformator 40,768

    4 pompa air 68,937

    5 tanki floculator 90,325

    6 saringan pasir 34,9647 ion exchanger 58,628

    8 bak penampung air pendingin 110,713

    9 cooling tower 19,543

    Total

  • 7/28/2019 ekotekQ (2)

    6/10

    harga sub total(rupiah)

    119,165,109,635

    4,025,189,436

    35,911,407

    1,986,096,830

    4,448,860,012

    10,009,900,017

    595,821,269

    357,511,433

    3,073,420,467

    578,783,579 2,411,580,091

    4,023,314,512

    139,335,635

    267,966,310

    53,594,818

    107,181,856

    5,360,260

    133,983,155

    65,917,970

    29,882,087

    29,882,087

    13,669,05139,879,088

    17,418,899

    18,757,019

    22,779,159

    151,657,106,082

    Harga Sub Total

    15,165,710,608

    15,165,710,608

    30,331,421,21660,662,842,433

    Harga Sub Total

    151,657,106,081.86

    60,662,842,432.74

    212,319,948,514.61

    un 2013

  • 7/28/2019 ekotekQ (2)

    7/10

    harga sub total(rupiah)

    13,054,961,009

    5,672,939,735

    396,879,279

    671,104,967

    879,313,772

    340,375,940570,745,967

    1,077,786,753

    190,248,656

    22,854,356,079

  • 7/28/2019 ekotekQ (2)

    8/10

    Direct CostsPurchased equipment-delivered (including fabricated equipment and process machinery)

    Purchased-equipment installation

    Instrumentation and controls (installed)

    Piping (installed)

    Electrical (installed)

    Buildings (including services)

    Yard improvements

    Service facilities (installed)

    Indirect CostsEngineering and supervision

    Construction expenses

    Legal expenses

    Contractors fee (about 5% of direct and indirect plant costs)

    Contingency (about 10% of direct and indirect plant costs)

    Total Indirect Costs

    hal 183. Tabel 17.Ratio factors for estimating capital-investment items based on delivered e

    Fluid Processing Plant

    Total Direct Cost

    Fixed Capital Investment (Total Direct and Indirect Plant Costs)

    Total capital investment

    Working capital (about 15% of total capital investment)

  • 7/28/2019 ekotekQ (2)

    9/10

  • 7/28/2019 ekotekQ (2)

    10/10

    percent Harga Sub Total100 235,174,304,594

    47 110,531,923,159

    36 84,662,749,654

    68 159,918,527,124

    11 25,869,173,505

    18 42,331,374,827

    10 23,517,430,459

    70 164,622,013,216

    846,627,496,537

    percent Harga Sub Total33 77,607,520,516

    41 45,318,088,495

    4 3,386,509,986

    22 35,182,075,967

    44 11,382,436,342

    172,876,631,307

    1,019,504,127,844

    179,912,493,149

    1,199,416,620,993

    uipmentcost