Dinding,Kusen,Listrik

51
TABEL PERHITUNGAN VOLUME DINDING VOLUME DINDING KOTOR segmen LANTAI DASAR/ Lt. 1 Dinding Horizontal 1 ,2 6 4 24.00 3,4 3 4 12.00 4,5 6 4 24.00 5,6 6 4 24.00 7,8 3 4 12.00 10,11 3 4 12.00 11,12 3 4 12.00 12,13 9 4 36.00 13,14 3 4 12.00 17,16 3 4 12.00 16,15 3 4 12.00 18,19 3 4 12.00 19,20 3 4 12.00 20,21 3 4 12.00 22,23 3 4 12.00 24,26 6 4 24.00 Dinding vertikal 2,5 3 4 12.00 7,11 6 4 24.00 8,12 6 4 24.00 6,14 12 4 48.00 10,18 6 4 24.00 16,19 4 4 14.40 15,20 4 4 14.40 21,22 1 4 4.00 23,24 1 4 4.00 14,26 6 4 24.00 LANTAI ATAS/ Lt. 2 Dinding Horizontal 1 ,2 6 4 24.00 3,4 3 4 12.00 4,5 6 4 24.00 5,6 3 4 12.00 6,7 6 4 24.00 7,8 6 4 24.00 10,11 1.8 4 7.20 panjang ( m ) Tinggi Dinding Luas Dinding (m2)

description

ee

Transcript of Dinding,Kusen,Listrik

Page 1: Dinding,Kusen,Listrik

TABELPERHITUNGAN VOLUME DINDING

VOLUME DINDING KOTOR

segmen panjang ( m )

LANTAI DASAR/ Lt. 1Dinding Horizontal

1 ,2 6 4 24.003,4 3 4 12.004,5 6 4 24.005,6 6 4 24.007,8 3 4 12.0010,11 3 4 12.0011,12 3 4 12.0012,13 9 4 36.0013,14 3 4 12.0017,16 3 4 12.0016,15 3 4 12.0018,19 3 4 12.0019,20 3 4 12.0020,21 3 4 12.0022,23 3 4 12.0024,26 6 4 24.00

Dinding vertikal2,5 3 4 12.007,11 6 4 24.008,12 6 4 24.006,14 12 4 48.0010,18 6 4 24.0016,19 4 4 14.4015,20 4 4 14.4021,22 1 4 4.0023,24 1 4 4.0014,26 6 4 24.00

LANTAI ATAS/ Lt. 2Dinding Horizontal

1 ,2 6 4 24.003,4 3 4 12.004,5 6 4 24.005,6 3 4 12.006,7 6 4 24.007,8 6 4 24.0010,11 1.8 4 7.20

Tinggi Dinding

Luas Dinding

(m2)

Page 2: Dinding,Kusen,Listrik

12,13 1.8 4 7.2021,22 1.6 4 6.4019,20 3.1 4 12.3218,17 2 4 8.0017,16 6 4 24.0016,15 6 4 24.0015,14 6 4 24.00

Dinding vertikal3,7 3 4 121,22 15 4 6021,18 9 4 3619,17 6 4 2420,23 6 4 2413,14 6 4 2411,12 6 4 24

TOTAL 893.92

VOLUME LUBANG KUSEN

lebar (m) Tinggi (m) Banyak

P1 2.10 0.90 10 18.90P2 2.10 0.85 2 3.57PJ1 2.70 3.10 1 8.37J1 2.90 5.60 12 194.88J2 2.90 2.85 5 41.33J3 3.40 4.07 2 27.68

Jumlah 294.721

VOLUME LUBANG KOLOM

Panjang (m) Tinggi (m) Banyak

Di Lantai 1K2 0.35 4 13 18.20K6 0.40 4 2 3.20KP 0.15 4 12 7.20

Di Lantai 2K3 0.30 4 12 14.40K6 0.40 4 3 4.80KP 0.15 4 16 9.60

volume Lubang Kolom (Vol. LK) 57.400

VOLUME KERAMIK DINDING KAMAR MANDIKamar Mandi 1 KETERANGAN GAMBAR

Ket. Nama

Volume (m2)

Ket. Nama

Volume (m2)

Page 3: Dinding,Kusen,Listrik

segmen panjang ( m )

AB 2.77 1.5 4.155CD 1.5 1.5 2.25DE 1.27 1.5 1.905EA 1.35 1.5 2.025DF 1.35 1.5 2.025BC 1.2 1.5 1.8TOTAL VOLUME KERAMIK DINDING 14.16

VOLUME LUBANG KUSEN

Panjang (m) Tinggi (m) Banyak

Type P2 0.80 2.10 1 1.68Type P1 0.90 2.10 1 1.89

JUMLAH 3.57MAKA VOLUME KERAMIK DINDING BERSIH ADALAHTOTAL VOLUME KERAMIK DINDING - VOLUME LUBANG KUSEN =

10.59 m2Kamar Mandi 2 KETERANGAN GAMBAR

segmen panjang ( m )

AB 2.77 1.5 4.155BC 1.5 1.5 2.25HD 1.5 1.5 2.25EF 1.5 1.5 2.25FG 1.27 1.5 1.905AG 2.4 1.5 3.6IB 2 1.5 3DC 1.2 1.5 1.8DE 1.2 1.5 1.8FH 1.2 1.5 1.8TOTAL VOLUME KERAMIK DINDING 24.81

VOLUME LUBANG KUSEN

Panjang (m) Tinggi (m) Banyak

Type P2 0.80 2.10 1 1.68Type P1 0.90 2.10 1 1.89JUMLAH 3.57

MAKA VOLUME KERAMIK DINDING BERSIH ADALAHTOTAL VOLUME KERAMIK DINDING - VOLUME LUBANG KUSEN =

21.24 m2

Tinggi Dinding

Luas Dinding

(m2)

Ket. Nama

Volume (m2)

Tinggi Dinding

Luas Dinding

(m2)

Ket. Nama

Volume (m2)

Page 4: Dinding,Kusen,Listrik

VOLUME DINDING BERSIHsymbol dimensi Volume Keterangan

vol. DK 893.92 m2 Vol. DK - Vol Ks - Vol. LK= vol.DK (Vol Dinding Kotor)Vol. Ks 294.721 m2 541.799 m2 vol.Ks (Vol Kusen)Vol. LK 57.400 m2 Vol. LK ( Vol. lubang Kolom)

VOLUME PLESTERAN 1 : 4symbol dimensi Volume Keterangan

Vol. DB 541.799 m2 (Vol. DB-VolKDB) x 2 = vol.DB (Vol Dinding Bersih total)Vol.KDB 31.83 1019.938 m2 Vol KD. (Vol. keramik dinding bersih)

VOLUME ACIANsymbol dimensi Volume Keterangan

Vol. PLS 541.799 m2 Vol. PLS = Vol Ac vol. PLS (volume Plesteran)1019.938 m2 vol. Ac (Volume Acian)

VOLUME KERAMIK DINDINGsymbol dimensi Volume Keterangan

VKM1 10.59 m2V tot = VKM1 +VKM2

VKM1 (Vol. Kamar Mandi 1) 1 buahVKM2 21.24 m2 VKM2 (Vol. Kamar Mandi 2) 1 buah

31.83 m2

VOLUME PLESTERAN 1 : 2symbol dimensi Volume Keterangan

Vol. KD 31.830 m2 Vol. KD x 2 = Volume total keramik dinding63.66 m2 (Vol KD)

VOLUME ACIANsymbol dimensi Volume Keterangan

Vol. PLS 63.66 m2 Vol. PLS = Vol Ac vol. PLS (volume Plesteran)63.66 m2 vol. Ac (Volume Acian)

Page 5: Dinding,Kusen,Listrik

TABELPERHITUNGAN VOLUME DINDING

Page 6: Dinding,Kusen,Listrik

VOLUME KERAMIK DINDING KAMAR MANDIKETERANGAN GAMBAR

Page 7: Dinding,Kusen,Listrik

KETERANGAN GAMBAR

Page 8: Dinding,Kusen,Listrik

VOLUME DINDING BERSIHKeterangan

vol.DK (Vol Dinding Kotor)vol.Ks (Vol Kusen)

Vol. LK ( Vol. lubang Kolom)VOLUME PLESTERAN 1 : 4

Keteranganvol.DB (Vol Dinding Bersih total)

Vol KD. (Vol. keramik dinding bersih)

VOLUME ACIANKeterangan

vol. PLS (volume Plesteran)vol. Ac (Volume Acian)

VOLUME KERAMIK DINDINGKeterangan

VKM1 (Vol. Kamar Mandi 1) 1 buahVKM2 (Vol. Kamar Mandi 2) 1 buah

VOLUME PLESTERAN 1 : 2Keterangan

Volume total keramik dinding(Vol KD)

VOLUME ACIANKeterangan

vol. PLS (volume Plesteran)vol. Ac (Volume Acian)

Page 9: Dinding,Kusen,Listrik

NO Uraian Jenis Pekerjaan Sat. Koeff

D PEKERJAAN DINDING1 1 M² PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC. : 4 PS. ( SNI. Edisi Rev. 2007)

Bahan : Bata Merah kelas I Bh 70.0000 612.00 Semen Portland Kg 11.5000 1,303.14 Pasir Pasang M³ 0.0430 119,167.00 Tenaga Kerja :Pekerja Oh 0.3200 45,400.00 Tukang Batu Oh 0.1000 54,200.00 Kepala Tukang Batu Oh 0.0100 59,800.00 Mandor Oh 0.0150 59,400.00 Jumlah

2 1 M2 PLESTERAN DINDING 1 PC. : 2 PS ; TEBAL 15 MM (SNI Edisi 2007)Bahan :Semen Portland Kg 10.2240 Rp 1,303.14 Pasir Pasang M3 0.0200 Rp 119,167.00 Tenaga Kerja :Pekerja Oh 0.3000 Rp 45,400.00 Tukang Batu Oh 0.1500 Rp 54,200.00 Kepala Tukang Batu Oh 0.0150 Rp 59,800.00 Mandor Oh 0.0150 Rp 59,400.00 Jumlah

3 1 M2 PLESTERAN DINDING 1PC : 4PS ; TEB. 15 MM (SNI. Edisi Rev. 2007)Bahan :Semen Portland Kg 6.24 Rp 1,303.14 Pasir Pasang M3 0.02 Rp 119,167.00 Tenaga Kerja :Pekerja Oh 0.30 Rp 45,400.00 Tukang Batu Oh 0.15 Rp 54,200.00 Kepala Tukang Batu Oh 0.02 Rp 59,800.00 Mandor Oh 0.02 Rp 59,400.00 Jumlah

4 1 M2 PASANGAN ACIAN (SNI Edisi 2007)Bahan :Semen Portland Kg 3.2500 Rp 1,303.14 Tenaga Kerja :Pekerja Oh 0.2000 Rp 45,400.00 Tukang Batu Oh 0.1000 Rp 54,200.00 Kepala Tukang Batu Oh 0.0100 Rp 59,800.00 Mandor Oh 0.0100 Rp 59,400.00

Jumlah5 1 M2 PASANGAN KERAMIK GRANIT TILE UKURAN 60 X 60

Bahan :Granit tile 60 x 60 Bh 3.1000 29,561.92

Harga Sat. Bahan / Upah Rp

Page 10: Dinding,Kusen,Listrik

Semen Portland Kg 11.3800 1,303.14 Pasir Pasang M3 0.0420 119,167.00 Semen Warna Kg 1.5000 10,617.00 Tenaga Kerja :Pekerja Oh 0.6200 45,400.00 Tukang Batu Oh 0.3300 54,200.00 Kepala Tukang Batu Oh 0.0350 59,800.00 Mandor Oh 0.0300 59,400.00 Jumlah

Page 11: Dinding,Kusen,Listrik

Jumlah Harga

Bahan Rp. Upah Rp.

1 M² PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC. : 4 PS. ( SNI. Edisi Rev. 2007)

42,840.00 - 14,986.11 - 5,124.18 -

- 14528.00- 5420.00- 598.00- 891.00

62,950.29 21,437.00 69,852.30

Rp 13,323.30 - Rp 2,383.34 -

- Rp 13,620.00 - Rp 8,130.00 - Rp 897.00 - Rp 891.00

Rp 15,706.64 Rp 23,538.00 Rp 39,244.64 1 M2 PLESTERAN DINDING 1PC : 4PS ; TEB. 15 MM (SNI. Edisi Rev. 2007)

Rp 8,131.59 Rp 2,860.01

Rp 13,620.00 Rp 8,130.00 Rp 897.00 Rp 891.00

Rp 10,991.60 Rp 23,538.00 Rp 34,529.60 1 M2 PASANGAN ACIAN (SNI Edisi 2007)

Rp 4,235.21

Rp 9,080.00 Rp 5,420.00 Rp 598.00 Rp 594.00

Rp 4,235.21 Rp 15,692.00 Rp 19,927.21

91,641.95

Jumlah Harga Bahan + Upah Rp.

Page 12: Dinding,Kusen,Listrik

14,829.73 5,005.01 15,925.50

28,148.00 17,886.00 2,093.00 1,782.00

127,402.20 49,909.00 177,311.20

Page 13: Dinding,Kusen,Listrik

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN DINDING

NO Uraian Jenis Pekerjaan Sat. Koeff

D1 PASANGAN BATA BIASAD1.1 Pasangan Bata Merah 1 PC : 4 PS

Bahan : Bata Merah kelas I Bh 70 37925.93Semen Portland Kg 11.5 6230.6885Pasir Pasang M³ 0.043 23.297357

Volume yang dibutuhkan = 541.799 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

D1.2 Plesteran Dinding 1 PC : 4 PS Bahan :Semen Portland Kg 6.24 6,364.41 Pasir Pasang M3 0.024 24.48

Volume yang dibutuhkan = 1019.938 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

D1.3 Pasangan AcianBahan :Semen Portland Kg 3.25 3,314.80

Volume yang dibutuhkan = 1019.938 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

D2.1 Pasangan Plesteran 1PC:2PSBahan :Semen Portland Kg 10.224 650.86 Pasir Pasang M3 0.02 1.27

Volume yang dibutuhkan = 63.660 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

D.2.2 Pasangan AcianBahan :Semen Portland Kg 3.25 206.90

Volume yang dibutuhkan = 63.660 m2Jumlah

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 14: Dinding,Kusen,Listrik

D.3 Pasangan Keramik Dinding granit tile 60 x 60Bahan :Granit tile 60 x 60 Bh 3.1 98.673Semen Portland Kg 11.38 362.2254Pasir Pasang M3 0.042 1.33686Semen Warna Kg 1.5 47.745

Volume yang dibutuhkan = 31.830 m2Jumlah

TABEL REKAPITULASI KEBUTUHAN MATERIAL BAHAN PERJENIS MATERIAL PEKERJAAN DINDING

NO JENIS BAHAN SATUANJUMLAH HARGABAHAN BAHAN (Rp.)

1 Bata Merah kelas I Bh 37,925.93 612.00 2 Semen Portland Kg 17,129.88 1,303.14 3 Pasir Pasang M³ 50.39 119,167.00 4 Granit tile 60 x 60 Bh 98.67 29,561.92 5 Semen Warna Kg 47.75 10,617.00

JUMLAH

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN DINDING

NO Uraian Jenis Pekerjaan Sat. Koeff

D1 PASANGAN BATA BIASAD1.1 Pasangan Bata Merah 1 PC : 4 PS

Tenaga Kerja :Pekerja Oh 0.32 173.37568Tukang Batu Oh 0.1 54.1799Kepala Tukang Batu Oh 0.01 5.41799Mandor Oh 0.015 8.126985

Volume yang dibutuhkan = 541.799 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

D1.2 Plesteran Dinding 1 PC : 4 PS Tenaga Kerja :Pekerja Oh 0.3 305.98 Tukang Batu Oh 0.15 152.99 Kepala Tukang Batu Oh 0.015 15.30 Mandor Oh 0.015 15.30

Volume yang dibutuhkan = 1019.938 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 15: Dinding,Kusen,Listrik

D1.3 Pasangan AcianTenaga Kerja :Pekerja Oh 0.2 203.99 Tukang Batu Oh 0.1 101.99 Kepala Tukang Batu Oh 0.01 10.20 Mandor Oh 0.01 10.20

Volume yang dibutuhkan = 1019.938 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

D2.1 Pasangan Plesteran 1PC:2PSTenaga Kerja :Pekerja Oh 0.3 19.10 Tukang Batu Oh 0.15 9.55 Kepala Tukang Batu Oh 0.015 0.95 Mandor Oh 0.015 0.95

Volume yang dibutuhkan = 63.660 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

D.2.2 Pasangan AcianTenaga Kerja :Pekerja Oh 0.2 12.73 Tukang Batu Oh 0.1 6.37 Kepala Tukang Batu Oh 0.01 0.64 Mandor Oh 0.01 0.64

Volume yang dibutuhkan = 63.660 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

D.3 Pasangan Keramik Dinding granit tile 60 x 60Tenaga Kerja :Pekerja Oh 0.62 19.7346Tukang Batu Oh 0.33 10.5039Kepala Tukang Batu Oh 0.035 1.11405Mandor Oh 0.03 0.9549

Volume yang dibutuhkan = 31.830 m2Jumlah

TABEL REKAPITULASI KEBUTUHAN MATERIAL UPAH PERJENIS MATERIAL PEKERJAAN DINDING

NO JENIS UPAH SATUANJUMLAH HARGA

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 16: Dinding,Kusen,Listrik

NO JENIS UPAH SATUANUPAH UPAH (Rp.)

1 Pekerja Oh 734.91 45,400.00 2 Tukang Batu Oh 335.58 54,200.00 3 Kepala Tukang Batu Oh 33.62 59,800.00 4 Mandor Oh 36.17 59,400.00

JUMLAH

Page 17: Dinding,Kusen,Listrik

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN DINDING

Harga Bahan (Rp) Biaya Bahan (Rp)

612.00 23,210,669.16 1,303.14 8,119,459.41 119,167.00 2,776,276.14

34,106,404.71

Harga Bahan (Rp) Biaya Bahan (Rp)

1,303.14 8,293,721.31 119,167.00 2,917,030.84

11,210,752.15

Harga Bahan (Rp) Biaya Bahan (Rp)

1,303.14 4,319,646.52

4,319,646.52

Harga Bahan (Rp) Biaya Bahan (Rp)

1,303.14 848,161.49 119,167.00 151,723.42

999,884.92

Harga Bahan (Rp) Biaya Bahan (Rp)

1,303.14 269,613.15

269,613.15

Page 18: Dinding,Kusen,Listrik

29,561.92 2,916,963.33 1,303.14 472,030.41 119,167.00 159,309.60 10,617.00 506,908.67

4,055,212.00

JUMLAH HARGABAHAN (Rp.)

23,210,669.16 22,322,632.29 6,004,340.00 2,916,963.33 506,908.67 54,961,513.45

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN DINDING

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 7,871,255.87 54,200.00 2,936,550.58 59,800.00 323,995.80 59,400.00 482,742.91

11,614,545.16

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 13,891,555.56 54,200.00 8,292,095.94 59,800.00 914,884.39 59,400.00 908,764.76

24,007,300.64

Harga Upah (Rp) Biaya Upah (Rp)

Page 19: Dinding,Kusen,Listrik

45,400.00 9,261,037.04 54,200.00 5,528,063.96 59,800.00 609,922.92 59,400.00 605,843.17

16,004,867.10

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 867,049.20 54,200.00 517,555.80 59,800.00 57,103.02 59,400.00 56,721.06

1,498,429.08

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 578,032.80 54,200.00 345,037.20 59,800.00 38,068.68 59,400.00 37,814.04

998,952.72

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 895,950.84 54,200.00 569,311.38 59,800.00 66,620.19 59,400.00 56,721.06

1,588,603.47

TABEL REKAPITULASI KEBUTUHAN MATERIAL UPAH PERJENIS MATERIAL PEKERJAAN DINDINGJUMLAH HARGA

Page 20: Dinding,Kusen,Listrik

UPAH (Rp.) 33,364,881.31 18,188,614.86 2,010,595.00 2,148,607.00 55,712,698.17

Page 21: Dinding,Kusen,Listrik

E. PEKERJAAN KUSEN PINTU DAN JENDELA

E.1 KUSEN

Type kuzenUkuran (m)

jumlahTinggi Lebar

P1 2.10 0.90 5.1 0.518 10P2 2.10 0.85 5.05 0.513 2PJ1 2.70 3.10 8.5 0.864 1J1 2.90 5.60 11.4 1.158 12J2 2.90 2.85 8.65 0.879 5J3 3.40 4.07 10.87 1.104 2

Total

E.2 DAUN PINTU DAN JENDELAE.2.1 DAUN PINTU KAYU

TYPE Lebar (m) Tinggi (m) Luas (m) jumlah TotalP1 0.80 2.00 1.6 10 16.0P2 0.75 2.00 1.5 2 3.0

Total 19.000E.2.2 DAUN PINTU KACA RANGKA ALUMUNIUM

TYPE Lebar (m) Tinggi (m) Luas (m) jumlah TotalPJ1 1.54 1.94 3.0 1 3.0

Total 3.0E.3 KACA 8 MM

TYPE Luas (m) jumlah TotalPJ1 4.138 1 4.1J1 14.148 12 169.8J2 7.290 5 36.5J3 6.272 2 12.5

Total 222.908E.4 PEKERJAAN AKSESORIS

E.4.1 Door Holder E.4.2 Kunci Tanam E.4.3Kunci kamar mandi Slot

Jumlah 12 2 2

Panjang kuzen (m)

volume kuzen 4"

(4" = 0.1016 m)

Page 22: Dinding,Kusen,Listrik

TOTAL

VOLUME (m)5.1821.0260.864

13.8994.3942.209

27.573

Page 23: Dinding,Kusen,Listrik

NO Uraian Jenis Pekerjaan Sat. Koeff Jumlah Harga

Bahan Rp.E PEKERJAAN KUSENE.1 1 M' PASANG KUSEN PINTU ALUMUNIUM (SNI Edisi 2007)

Bahan :Profil Alumunium M1 1.1 85,800.00 94,380.00 Skrup Fixer Bh 2 8,250.00 16,500.00 Sealant Tube 0.06 25,000.00 1,500.00 Tenaga Kerja :Pekerja Oh 0.043 45,400.00 Tukang besi profil Oh 0.043 55,900.00 Kepala Tukang besi profil Oh 0.0043 61,000.00

Mandor Oh 0.0021 59,400.00

jumlah 112,380.00

E.2 PEMASANGAN DAUN PINTUE.2.1 1 M2 DAUN PINTU LAPIS TEAKWOOD RANGKAP, RANGKA TERTUTUP KAYU EKSPOSE (SNI Edisi 2007)

Bahan :Kayu Borneo, Papan M3 0.0250 4,679,167.00 116,979.18 Paku biasa 1" - 2 1/2" Kg 0.0300 19,250.00 577.50 Lem Kayu Kg 0.3000 40,000.00 12,000.00 Teakwood, t = 4 mm uk. 90x220 Lbr 1.0000 107,800.00 107,800.00 Tenaga Kerja :Pekerja Oh 0.8000 45,400.00 - Tukang Kayu Oh 2.4000 55,900.00 - Kepala Tukang Kayu Oh 0.2400 61,000.00 - Mandor Oh 0.0400 59,400.00 - Jumlah 237,356.68

NO Uraian Jenis Pekerjaan Sat. Koeff Jumlah Harga

Bahan Rp.E.2.2 1 M2 PEMASANGAN DAUN PINTU KACA RANGKA ALUMUNIUM

Bahan :Profil Alumunium m' 4.4 215,000.00 946,000.00 Profil Kaca m' 4.5 5,000.00 22500Sealant Tube 0.27 25,000.00 6750Tenaga Kerja :Pekerja Oh 0.085 45,400.00 Tukang Kayu Oh 0.085 55,900.00 Kepala Tukang Kayu Oh 0.0085 61,000.00 Mandor Oh 0.005 59,400.00 jumlah 975,250.00

Harga Sat. Bahan / Upah Rp

Harga Sat. Bahan / Upah Rp

Page 24: Dinding,Kusen,Listrik

E.3 PASANGAN KACA 8 MM1 M2 PASANGAN KACA T = 8 MM (SNI Edisi 2007)Bahan :Kaca M2 1.1000 211,200.00 232,320.00 Tenaga Kerja :Pekerja Oh 0.0165 45,400.00 - Tukang Kayu Oh 0.1650 55,900.00 - Kepala Tukang Kayu Oh 0.0165 61,000.00 - Mandor Oh 0.0008 59,400.00 - Jumlah 232,320.00

E.4 PEKERJAAN AKSESORISE.4.1 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER (SNI Edisi 2007)

Bahan :Door Holder Bh 1.0000 132,000.00 132,000.00 Tenaga Kerja :Pekerja Oh 0.0500 45,400.00 - Tukang Kayu Oh 0.5000 55,900.00 - Kepala Tukang Kayu Oh 0.0500 61,000.00 - Mandor Oh 0.0025 59,400.00 - Jumlah 132,000.00

E.4.2 1 BUAH PASANG KUNCI TANAM KAMAR MANDI (SNI Edisi 2007)Bahan :Kunci Tanam Kamar Mandi Bh 1.0000 99,000.00 99,000.00 Tenaga Kerja :Pekerja Oh 0.0050 45,400.00 - Tukang Kayu Oh 0.5000 55,900.00 - Kepala Tukang Kayu Oh 0.0050 61,000.00 - Mandor Oh 0.0025 59,400.00 - Jumlah 99,000.00

E.4.3 1 BUAH PASANG KUNCI SELOT (SNI Edisi 2007)Bahan :Kunci Selot Bh 1.0000 8,000.00 8,000.00 Tenaga Kerja :Pekerja Oh 0.0200 45,400.00 - Tukang Kayu Oh 0.2000 55,900.00 - Kepala Tukang Kayu Oh 0.0200 61,000.00 - Mandor Oh 0.0010 59,400.00 - Jumlah 8,000.00

Page 25: Dinding,Kusen,Listrik

Jumlah Harga

Upah Rp.

1,952.20 2,403.70 262.30

124.74

4,742.94 117,122.94

1 M2 DAUN PINTU LAPIS TEAKWOOD RANGKAP, RANGKA TERTUTUP KAYU EKSPOSE (SNI Edisi 2007)

----

36,320.00 134,160.00 14,640.00 2,376.00

187,496.00 424,852.68

Jumlah Harga

Upah Rp.

3,859.00 4,751.50 518.50 297.00 9,426.00 984676

Jumlah Harga Bahan + Upah Rp.

Jumlah Harga Bahan + Upah Rp.

Page 26: Dinding,Kusen,Listrik

-

749.10 9,223.50 1,006.50 47.52

11,026.62 243,346.62

-

2,270.00 27,950.00 3,050.00 148.50

33,418.50 165,418.50

-

227.00 27,950.00 305.00 148.50

28,630.50 127,630.50

-

908.00 11,180.00 1,220.00 59.40

13,367.40 21,367.40

Page 27: Dinding,Kusen,Listrik

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN KUSEN

NO Uraian Jenis Pekerjaan Sat. Koeff

E.1 Pekerjaan Kusen Alumunium 4"Bahan :Profil Alumunium M1 1.1 30.331Skrup Fixer Bh 2 55.146Sealant Tube 0.06 1.654

Volume yang dibutuhkan = 27.573 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.2 Pekerjaan Daun PintuE.2.1 Daun pintu Lapis Taekwood Rangkap

Bahan :Kayu Borneo, Papan M3 0.025 0.475Paku biasa 1" - 2 1/2" Kg 0.03 0.57Lem Kayu Kg 0.3 5.7Teakwood, t = 4 mm uk. 90x220 Lbr 1 19

Volume yang dibutuhkan = 19 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.2.2 Daun Pintu Kaca Rangka AlumuniumBahan :Profil Alumunium m' 4.4 13Profil Kaca m' 4.5 13.444Sealant Tube 0.27 0.807

Volume yang dibutuhkan = 3 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.3 Pasangan Kaca 8 mmBahan :Kaca M2 1.1 245.1988

Volume yang dibutuhkan = 223 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.4 Pemasangan AksesorisE.4.1 Pasangan Pegangan Pintu (door holder)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 28: Dinding,Kusen,Listrik

Bahan :Door Holder Bh 1 12

Volume yang dibutuhkan = 12 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.4.2 Pasangan Kunci Tanam Kamar MandiBahan :Kunci Tanam Kamar Mandi Bh 1 2

Volume yang dibutuhkan = 2 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.4.3 Pasangan Kunci SlotBahan :Kunci Selot Bh 1 2.00

Volume yang dibutuhkan = 2 m2Jumlah

TABEL REKAPITULASI KEBUTUHAN MATERIAL BAHAN PERJENIS MATERIAL PEKERJAAN KUSENNO JENIS BAHAN SATUAN JUMLAH HARGA

BAHAN BAHAN (Rp.)1 Profil Alumunium M1 30.33 85,800.00 2 Skrup Fixer Bh 55.15 8,250.00 3 Sealant Tube 2.46 25,000.00 4 Kayu Borneo, Papan M3 0.48 4,679,167.00 5 Paku biasa 1" - 2 1/2" Kg 0.57 19,250.00 6 Lem Kayu Kg 5.70 40,000.00 7 Teakwood, t = 4 mm uk. 90x220 Lbr 19.00 107,800.00 8 Profil Kaca m' 13.44 5,000.00 9 Kaca M2 245.20 211,200.00

10 Door Holder Bh 12.00 132,000.00 11 Kunci Tanam Kamar Mandi Bh 2.00 99,000.00 12 Kunci Selot Bh 2.00 8,000.00 13 Profil Alumunium Pintu Kaca m' 13 215000

JUMLAHPERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN KUSEN

NO Uraian Jenis Pekerjaan Sat. Koeff

E.1 Pekerjaan Kusen Alumunium 4"Tenaga Kerja :Pekerja Oh 0.043 1.19

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 29: Dinding,Kusen,Listrik

Tukang besi profil Oh 0.043 1.19 Kepala Tukang besi profil Oh 0.0043 0.12 Mandor Oh 0.0021 0.06

Volume yang dibutuhkan = 27.573 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.2 Pekerjaan Daun PintuE.2.1 Daun pintu Lapis Taekwood Rangkap

Tenaga Kerja :Pekerja Oh 0.8 15.2Tukang Kayu Oh 2.4 45.6Kepala Tukang Kayu Oh 0.24 4.56Mandor Oh 0.04 0.76

Volume yang dibutuhkan = 19.000 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.2.2 Daun Pintu Kaca Rangka AlumuniumTenaga Kerja :Pekerja Oh 0.085 0.253946Tukang Kayu Oh 0.085 0.253946Kepala Tukang Kayu Oh 0.0085 0.0253946Mandor Oh 0.005 0.014938

Volume yang dibutuhkan = 2.988 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.3 Pasangan Kaca 8 mmTenaga Kerja :Pekerja Oh 0.0165 3.678Tukang Kayu Oh 0.165 36.780Kepala Tukang Kayu Oh 0.0165 3.678Mandor Oh 0.0008 0.178

Volume yang dibutuhkan = 222.908 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.4 Pemasangan AksesorisE.4.1 Pasangan Pegangan Pintu (door holder)

Tenaga Kerja :Pekerja Oh 0.05 0.6

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 30: Dinding,Kusen,Listrik

Tukang Kayu Oh 0.5 6Kepala Tukang Kayu Oh 0.05 0.6Mandor Oh 0.0025 0.03

Volume yang dibutuhkan = 12.000 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.4.2 Pasangan Kunci Tanam Kamar MandiTenaga Kerja :Pekerja Oh 0.005 0.01Tukang Kayu Oh 0.5 1Kepala Tukang Kayu Oh 0.005 0.01Mandor Oh 0.0025 0.005

Volume yang dibutuhkan = 2.000 m2Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

E.4.3 Pasangan Kunci SlotTenaga Kerja :Pekerja Oh 0.02 0.04Tukang Kayu Oh 0.2 0.4Kepala Tukang Kayu Oh 0.02 0.04Mandor Oh 0.001 0.002

Volume yang dibutuhkan = 2.000 m2Jumlah

TABEL REKAPITULASI KEBUTUHAN MATERIAL UPAH PERJENIS MATERIAL PEKERJAAN KUSENNO JENIS UPAH SATUAN JUMLAH HARGA

UPAH UPAH (Rp.)1 Pekerja Oh 20.97 45,400.00 2 Tukang besi profil Oh 1.19 55,900.00 3 Kepala Tukang besi profil Oh 0.12 61,000.00 4 Mandor Oh 1.05 59,400.00 5 Tukang Kayu Oh 90.034 55,900.00 6 Kepala Tukang Kayu Oh 8.913 61,000.00

JUMLAH

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 31: Dinding,Kusen,Listrik

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN KUSEN

Harga Bahan (Rp) Biaya Bahan (Rp)

85,800.00 2,602,360.88 8,250.00 454,958.20 25,000.00 41,359.84

3,098,678.91

Harga Bahan (Rp) Biaya Bahan (Rp)

4,679,167.00 2,222,604.33 19,250.00 10,972.50 40,000.00 228,000.00 107,800.00 2,048,200.00

4,509,776.83

Harga Bahan (Rp) Biaya Bahan (Rp)

215,000.00 2,826,269.60 5,000.00 67,221.00 25,000.00 20,166.30

2,913,656.90

Harga Bahan (Rp) Biaya Bahan (Rp)

211,200.00 51,785,986.56

51,785,986.56

Harga Bahan (Rp) Biaya Bahan (Rp)

Page 32: Dinding,Kusen,Listrik

132,000.00 1,584,000.00

1,584,000.00

Harga Bahan (Rp) Biaya Bahan (Rp)

99,000.00 198,000.00

198,000.00

Harga Bahan (Rp) Biaya Bahan (Rp)

8,000.00 16,000.00

16,000.00

TABEL REKAPITULASI KEBUTUHAN MATERIAL BAHAN PERJENIS MATERIAL PEKERJAAN KUSENJUMLAH HARGA

BAHAN (Rp.) 2,602,360.88 454,958.20 61,526.14 2,222,604.33 10,972.50 228,000.00 2,048,200.00 67,221.00 51,785,986.56 1,584,000.00 198,000.00 16,000.00 2,826,269.60 64,106,099.20

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN KUSEN

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 53,828.45

Page 33: Dinding,Kusen,Listrik

55,900.00 66,277.76 61,000.00 7,232.46 59,400.00 3,439.48

130,778.15

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 690,080.00 55,900.00 2,549,040.00 61,000.00 278,160.00 59,400.00 45,144.00

3,562,424.00

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 11,529.15 55,900.00 14,195.58 61,000.00 1,549.07 59,400.00 887.32

28,161.12

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 166,980.38 55,900.00 2,055,991.94 61,000.00 224,356.90 59,400.00 10,592.59

2,457,921.81

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 27,240.00

Page 34: Dinding,Kusen,Listrik

55,900.00 335,400.00 61,000.00 36,600.00 59,400.00 1,782.00

401,022.00

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 454.00 55,900.00 55,900.00 61,000.00 610.00 59,400.00 297.00

57,261.00

Harga Upah (Rp) Biaya Upah (Rp)

45,400.00 1,816.00 55,900.00 22,360.00 61,000.00 2,440.00 59,400.00 118.80

26,734.80

TABEL REKAPITULASI KEBUTUHAN MATERIAL UPAH PERJENIS MATERIAL PEKERJAAN KUSENJUMLAH HARGA

UPAH (Rp.) 951,927.98 66,277.76 7,232.46 62,261.19 5,032,887.52 543,715.97 6,664,302.88

Page 35: Dinding,Kusen,Listrik

I. PEKERJAAN INSTALASI LISTRIK

NO. JENIS JUMLAH SIMBOL

I.1 SAKELAR TUNGGAL 6/10 A 4

I.2 SAKELAR GANDA 6/10 A 12

I.3 STOP KONTAK 250 VA UNTUK DINDING 16

I.4 STOP KONTAK KOMPUTER 250 VA 4

I.5 INSTALASI LAMPU

I.5.1 LAMPU OFFICE RMC (M1) TANDUK TL 2X36 WATT 28I.5.2 BALK TL 1X36 WATT / COOLDAYLIGHT (EMERGENCY LAMP) 55I.5.3 DLR 175 GLOSSY E27 ESSENSIAL 18 WATT / COOL DAYLIGHT 49I.5.4 DLR 150 GLOSSY E27 ESSENSIAL 18 WATT/COOL DAYLIGHT 17I.6 INSTALASI AC (AIR CONDITIONER)

I.6.1 AC POWER 11

I.7 EXHOUST FAN 7I.8 PANELBOX UKURAN 20 X 40 X 60 1

Page 36: Dinding,Kusen,Listrik

NO Uraian Jenis Pekerjaan Sat. Koeff

I.1 1 BUAH PAS. SAKLAR TUNGGAL 6/10 ABahan :Saklar Tunggal Bh 1 Rp 20,000.00 Kabel m' 5 Rp 5,940.00 Tenaga kerja

Ongkos Pasang ls 1 Rp 5,000.00

Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.2 1 BUAH SAKLAR GANDA 6/10 Abahan :Saklar Ganda Bh 1 Rp 25,000.00 Kabel m' 5 Rp 5,940.00 tenaga Kerja

Ongkos Pasang ls 1 Rp 5,000.00

Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.3 1 BUAH PAS. STOP KONTAKBahan :Stop Kontak Bh 1 Rp 15,700.00 Kabel m' 5 Rp 5,940.00 Tenaga kerja

Ongkos Pasang ls 1 Rp 5,000.00

Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.4 1 BUAH PAS. STOP KONTAK KOMPUTER 250 VOLTBahan :Stop Kontak komputer 250 v Bh 1 Rp 39,700.00 Kabel m' 5 Rp 5,940.00 Tenaga kerja

Ongkos Pasang ls 1 Rp 5,000.00

Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5 INSTALASI LAMPUI.5.1 LAMPU OFFICE RMC (M1) TANDUK TL 2X36 WATT

bahanLampu OfficeRMC (m1) Tanduk TL 2 x 36 w bh 1 Rp 856,000.00 Kabel m' 5 Rp 5,940.00

Harga Sat. Bahan / Upah Rp

Harga Sat. Bahan / Upah Rp

Harga Sat. Bahan / Upah Rp

Harga Sat. Bahan / Upah Rp

Harga Sat. Bahan / Upah Rp

Page 37: Dinding,Kusen,Listrik

tenaga kerja

Ongkos pasang ls 1 Rp 25,000.00

Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5.2 BALK TL 1X36 WATT / COOLDAYLIGHT (EMERGENCY LAMP)bahanBALK TL 1X36 WATT / COOLDAYLIGHT (EMERGENCY LAMbh 1 Rp 168,900.00 Kabel m' 5 Rp 5,940.00 tenaga kerja

Ongkos pasang ls 1 Rp 25,000.00

Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5.3 DLR 175 GLOSSY E27 ESSENSIAL 18 WATT / COOL DAYLIGHTbahanDLR 175 GLOSSY E27 ESSENSIAL 18 WATT / COOL DAYLI bh 1 Rp 250,600.00 Kabel m' 5 Rp 5,940.00 tenaga kerja

Ongkos pasang ls 1 Rp 25,000.00

Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5.4 DLR 150 GLOSSY E27 ESSENSIAL 18 WATT/COOL DAYLIGHTbahanDLR 150 GLOSSY E27 ESSENSIAL 18 WATT/COOL DAYLIGbh 1 Rp 236,800.00 Kabel m' 5 Rp 5,940.00 tenaga kerja

Ongkos pasang ls 1 Rp 25,000.00

Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.6 INSTALASI AIR CONDITIONER (AC)I.6.1 1 BUAH AC POWER

Bahan :AC Power Unit 1 Rp 122,200.00 Tenaga Kerja

Ongkos Pasang Ls 1 Rp 35,000.00

Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.7 INSTALASI EXHOUST FAN1 BUAH EXHAUST FANBahan :

Harga Sat. Bahan / Upah Rp

Harga Sat. Bahan / Upah Rp

Harga Sat. Bahan / Upah Rp

Harga Sat. Bahan / Upah Rp

Harga Sat. Bahan / Upah Rp

Page 38: Dinding,Kusen,Listrik

Exhaust Fan Unit 1 Rp 210,000.00 Tenaga Kerja

Ongkos Pasang Ls 1 Rp 35,000.00

Jumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.8 PANEL BOX UKURAN 20 X 40 X 60 CMBahan :Panel Box 20 x 40 x 60 Unit 1 Rp 792,120.00 Tenaga Kerja

Ongkos Pasang Ls 1 Rp 35,000.00

Jumlah

Harga Sat. Bahan / Upah Rp

Page 39: Dinding,Kusen,Listrik

Jumlah Harga

Bahan Rp. Upah Rp.

Rp 20,000.00 Rp 29,700.00

Rp 5,000.00

Rp 49,700.00 Rp 5,000.00 Rp 54,700.00 Jumlah Harga

Bahan Rp. Upah Rp.

Rp 25,000.00 Rp 29,700.00

Rp 5,000.00

Rp 54,700.00 Rp 5,000.00 Rp 59,700.00 Jumlah Harga

Bahan Rp. Upah Rp.

Rp 15,700.00 Rp 29,700.00

Rp 5,000.00

Rp 45,400.00 Rp 5,000.00 Rp 50,400.00 Jumlah Harga

Bahan Rp. Upah Rp.

Rp 39,700.00 Rp 29,700.00

Rp 5,000.00

Rp 69,400.00 Rp 5,000.00 Rp 74,400.00 Jumlah Harga

Bahan Rp. Upah Rp.

Rp 856,000.00 Rp 29,700.00

Jumlah Harga Bahan + Upah Rp.

Jumlah Harga Bahan + Upah Rp.

Jumlah Harga Bahan + Upah Rp.

Jumlah Harga Bahan + Upah Rp.

Jumlah Harga Bahan + Upah Rp.

Page 40: Dinding,Kusen,Listrik

Rp 25,000.00

Rp 885,700.00 Rp 25,000.00 Rp 910,700.00 Jumlah Harga

Bahan Rp. Upah Rp.

Rp 168,900.00 Rp 29,700.00

Rp 25,000.00

Rp 198,600.00 Rp 25,000.00 Rp 223,600.00 Jumlah Harga

Bahan Rp. Upah Rp.

Rp 250,600.00 Rp 29,700.00

Rp 25,000.00

Rp 280,300.00 Rp 25,000.00 Rp 305,300.00 Jumlah Harga

Bahan Rp. Upah Rp.

Rp 236,800.00 Rp 29,700.00

Rp 25,000.00

Rp 266,500.00 Rp 25,000.00 Rp 291,500.00 Jumlah Harga

Bahan Rp. Upah Rp.

Rp 122,200.00

Rp 35,000.00

Rp 122,200.00 Rp 35,000.00 Rp 157,200.00 Jumlah Harga

Bahan Rp. Upah Rp.

Jumlah Harga Bahan + Upah Rp.

Jumlah Harga Bahan + Upah Rp.

Jumlah Harga Bahan + Upah Rp.

Jumlah Harga Bahan + Upah Rp.

Jumlah Harga Bahan + Upah Rp.

Page 41: Dinding,Kusen,Listrik

Rp 210,000.00

Rp 35,000.00

Rp 210,000.00 Rp 35,000.00 Rp 245,000.00 Jumlah Harga

Bahan Rp. Upah Rp.

Rp 792,120.00

Rp 35,000.00

Rp 792,120.00 Rp 35,000.00 Rp 827,120.00

Jumlah Harga Bahan + Upah Rp.

Page 42: Dinding,Kusen,Listrik

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN INSTALASI LISTRIKNO Uraian Jenis Pekerjaan Sat. Koeff

I.1 SAKELAR TUNGGAL 6/10 ABahan :Saklar Tunggal Bh 1 4.00 Kabel m' 5 20.00

Volume yang dibutuhkan = 4.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.2 SAKELAR GANDA 6/10 Abahan :Saklar Ganda Bh 1 12Kabel m' 5 60

Volume yang dibutuhkan = 12.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.3 STOP KONTAK 250 VA UNTUK DINDINGBahan :Stop Kontak Bh 1.00 16.00 Kabel m' 5.00 80.00

Volume yang dibutuhkan = 16.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.4 STOP KONTAK KOMPUTER 250 VABahan :Stop Kontak komputer 250 v Bh 1 4Kabel m' 5 20

Volume yang dibutuhkan = 4.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5 INSTALASI LAMPUI.5.1 LAMPU OFFICE RMC (M1) TANDUK TL 2X36 WATT

bahanLampu OfficeRMC (m1) Tanduk TL 2 x 36 w bh 1 28Kabel m' 5 140

Volume yang dibutuhkan = 28.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 43: Dinding,Kusen,Listrik

I.5.2 BALK TL 1X36 WATT / COOLDAYLIGHT (EMERGENCY LAMP)bahanBALK TL 1X36 WATT / COOLDAYLIGHT (EMERGENCY LAMP) bh 1 55Kabel m' 5 275

Volume yang dibutuhkan = 55.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5.3 DLR 175 GLOSSY E27 ESSENSIAL 18 WATT / COOL DAYLIGHTbahanDLR 175 GLOSSY E27 ESSENSIAL 18 WATT / COOL DAYLIGHT bh 1 49Kabel m' 5 245

Volume yang dibutuhkan = 49.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5.4 DLR 150 GLOSSY E27 ESSENSIAL 18 WATT/COOL DAYLIGHTbahanDLR 150 GLOSSY E27 ESSENSIAL 18 WATT/COOL DAYLIGHT bh 1 17Kabel m' 5 85

Volume yang dibutuhkan = 17.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.6 INSTALASI AC (AIR CONDITIONER)I.6.1 AC POWER

Bahan :AC Power Unit 1 11

Volume yang dibutuhkan = 11.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.7 EXHOUST FANBahan :Exhaust Fan Unit 1 7

Volume yang dibutuhkan = 7.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.8 PANELBOX UKURAN 20 X 40 X 60Bahan :Panel Box 20 x 40 x 60 Unit 1 1

Volume yang dibutuhkan = 1.000 bh

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 44: Dinding,Kusen,Listrik

Jumlah

TABEL REKAPITULASI KEBUTUHAN MATERIAL BAHAN PERJENIS MATERIAL PEKERJAAN INSTALASI LISTRIK

NO JENIS BAHANSATUAN JUMLAH HARGA

BAHAN BAHAN (Rp.)1 Saklar Tunggal Bh 4.00 20,000.00 2 Kabel m' 925.00 5,940.00 3 Saklar Ganda Bh 12.00 25,000.00 4 Stop Kontak Bh 16.00 15,700.00 5 Stop Kontak komputer 250 v Bh 4 39,700.00 6 Lampu OfficeRMC (m1) Tanduk TL 2 x 36 w bh 28 856,000.00 7 BALK TL 1X36 WATT / COOLDAYLIGHT (EMERGENCY LAMP) bh 55 168,900.00 8 DLR 175 GLOSSY E27 ESSENSIAL 18 WATT / COOL DAYLIGHT bh 49 250,600.00 9 DLR 150 GLOSSY E27 ESSENSIAL 18 WATT/COOL DAYLIGHT bh 17 236,800.00

10 AC Power Unit 11 122,200.00 11 Exhaust Fan Unit 7 210,000.00 12 Panel Box 20 x 40 x 60 Unit 1 792,120.00

JUMLAH

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN INSTALASI LISTRIK

NO Uraian Jenis Pekerjaan Sat. Koeff

I.1 SAKELAR TUNGGAL 6/10 ATenaga kerja Ongkos Pasang ls 1.00 4.00

Volume yang dibutuhkan = 4.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.2 SAKELAR GANDA 6/10 Atenaga KerjaOngkos Pasang ls 1 12.000

Volume yang dibutuhkan = 12.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.3 STOP KONTAK 250 VA UNTUK DINDINGTenaga kerjaOngkos Pasang ls 1 16.000

Volume yang dibutuhkan = 16.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.4 STOP KONTAK KOMPUTER 250 VATenaga kerja

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 45: Dinding,Kusen,Listrik

Ongkos Pasang ls 1 4.000Volume yang dibutuhkan = 4.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5 INSTALASI LAMPUI.5.1 LAMPU OFFICE RMC (M1) TANDUK TL 2X36 WATT

tenaga kerjaOngkos pasang ls 1 28.000

Volume yang dibutuhkan = 28.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5.2 BALK TL 1X36 WATT / COOLDAYLIGHT (EMERGENCY LAMP)tenaga kerjaOngkos pasang ls 1 55.00

Volume yang dibutuhkan = 55.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5.3 DLR 175 GLOSSY E27 ESSENSIAL 18 WATT / COOL DAYLIGHTtenaga kerjaOngkos pasang ls 1 49.000

Volume yang dibutuhkan = 49.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.5.4 DLR 150 GLOSSY E27 ESSENSIAL 18 WATT/COOL DAYLIGHTtenaga kerjaOngkos pasang ls 1 17.000

Volume yang dibutuhkan = 17.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.6 INSTALASI AC (AIR CONDITIONER)I.6.1 AC POWER

Tenaga KerjaOngkos Pasang Ls 1 11.000

Volume yang dibutuhkan = 11.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.7 EXHOUST FANTenaga KerjaOngkos Pasang Ls 1 7.00

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

kebutuhan (koeff x v.kebutuhan)

Page 46: Dinding,Kusen,Listrik

Volume yang dibutuhkan = 7.000 bhJumlah

NO Uraian Jenis Pekerjaan Sat. Koeff

I.8 PANELBOX UKURAN 20 X 40 X 60Tenaga KerjaOngkos Pasang Ls 1 1

Volume yang dibutuhkan = 1.000 bhJumlah

TABEL REKAPITULASI KEBUTUHAN MATERIAL UPAH PERJENIS MATERIAL PEKERJAAN DINDING

NO JENIS UPAH SATUANJUMLAH HARGA

UPAH UPAH (Rp.)1 Ongkos Pasang Sakelar dan Stop Kontak Ls 36.000 5,000.00 2 Ongkos Pasang Lampu Ls 149.000 25,000.00 3 Ongkos Pasang AC Ls 11.000 35,000.00 4 Ongkos Pasang Panel Box Ls 1 35,000.00 5 Ongkos Pasang Exhoust Fan Ls 7.00 35,000.00

JUMLAH

kebutuhan (koeff x v.kebutuhan)

Page 47: Dinding,Kusen,Listrik

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN INSTALASI LISTRIKHarga Bahan (Rp) Biaya Bahan (Rp)

20,000.00 80,000.00 5,940.00 118,800.00

198,800.00

Harga Bahan (Rp) Biaya Bahan (Rp)

25,000.00 300,000.00 5,940.00 356,400.00

656,400.00

Harga Bahan (Rp) Biaya Bahan (Rp)

15,700.00 251,200.00 5,940.00 475,200.00

726,400.00

Harga Bahan (Rp) Biaya Bahan (Rp)

39,700.00 158,800.00 5,940.00 118,800.00

277,600.00

Harga Bahan (Rp) Biaya Bahan (Rp)

856,000.00 23,968,000.00 5,940.00 831,600.00

24,799,600.00

Harga Bahan (Rp) Biaya Bahan (Rp)

Page 48: Dinding,Kusen,Listrik

168900 92895005940 1633500

10,923,000.00

Harga Bahan (Rp) Biaya Bahan (Rp)

250,600.00 12,279,400.00 5,940.00 1,455,300.00

13,734,700.00

Harga Bahan (Rp) Biaya Bahan (Rp)

236,800.00 4,025,600.00 5,940.00 504,900.00

4,530,500.00

Harga Bahan (Rp) Biaya Bahan (Rp)

122,200.00 1,344,200.00

1,344,200.00

Harga Bahan (Rp) Biaya Bahan (Rp)

210,000.00 1,470,000.00

1,470,000.00

Harga Bahan (Rp) Biaya Bahan (Rp)

792,120.00 792,120.00

Page 49: Dinding,Kusen,Listrik

792,120.00

JUMLAH HARGABAHAN (Rp.)

80,000.00 5,494,500.00 300,000.00 251,200.00 158,800.00 23,968,000.00 9,289,500.00 12,279,400.00 4,025,600.00 1,344,200.00 1,470,000.00 792,120.00 59,453,320.00

PERHITUNGAN KEBUTUHAN MATERIAL DARI MASING - MASING AKTIVITAS PEKERJAAN INSTALASI LISTRIK

Harga Upah (Rp) Biaya Upah (Rp)

5,000.00 20,000.00

20,000.00

Harga Upah (Rp) Biaya Upah (Rp)

5,000.00 60,000.00

60,000.00

Harga Upah (Rp) Biaya Upah (Rp)

5,000.00 80,000.00

80,000.00

Harga Upah (Rp) Biaya Upah (Rp)

Page 50: Dinding,Kusen,Listrik

5,000.00 20,000.00

20,000.00

Harga Upah (Rp) Biaya Upah (Rp)

25,000.00 700,000.00

700,000.00

Harga Upah (Rp) Biaya Upah (Rp)

25,000.00 1,375,000.00

1,375,000.00

Harga Upah (Rp) Biaya Upah (Rp)

25,000.00 1,225,000.00

1,225,000.00

Harga Upah (Rp) Biaya Upah (Rp)

25,000.00 425,000.00

425,000.00

Harga Upah (Rp) Biaya Upah (Rp)

35,000.00 385,000.00

385,000.00

Harga Upah (Rp) Biaya Upah (Rp)

35,000.00 245,000.00

Page 51: Dinding,Kusen,Listrik

245,000.00

Harga Upah (Rp) Biaya Upah (Rp)

35,000.00 35,000.00

35,000.00

TABEL REKAPITULASI KEBUTUHAN MATERIAL UPAH PERJENIS MATERIAL PEKERJAAN DINDINGJUMLAH HARGA

UPAH (Rp.) 180,000.00 3,725,000.00 385,000.00 35,000.00 245,000.00 4,570,000.00