vi DAFTAR ISI HALAMAN JUDUL ...............................................................................................i PENGESAHAN ..................................................................................................... ii PERNYATAAN .................................................................................................... iii PERSEMBAHAN...................................................................................................iv KATA PENGANTAR ........................................................................................... v DAFTAR ISI ........................................................................................................ vi DAFTAR TABEL ................................................................................................. x DAFTAR GAMBAR ........................................................................................... xii DAFTAR NOTASI ..............................................................................................xvi INTISARI ..........................................................................................................xviii BAB I PENDAHULUAN ...................................................................................... 1 1.1 Latar Belakang Masalah ............................................................................. 1 1.2 Rumusan Masalah .......................................................................................3 1.3 Batasan Masalah ........................................................................................ 3 1.4 Keaslian Peneltian ...................................................................................... 4 1.5 Tujuan Penelitian ....................................................................................... 4 1.6 Manfaat Penelitian ..................................................................................... 4 BAB II TINJAUAN PUSTAKA ............................................................................. 5 2.1 Performance Based Design ....................................................................... 5 2.2 Base Isolation …......................................................................................... 7 BAB III LANDASAN TEORI .............................................................................. 12 3.1 Performance Based Design…......................................................................12 3.2 Teori Dinamik Base Isolation.....................................................................14 3.3 Teori Perhitungan Isolator High Damping Rubber Bearing......................16 3.4 Teori Perencanaan Gempa Menurut SNI 03-1726-2012 ..........................18 3.4.1 Gempa Rencana ........................................................................................18 3.4.2 Klasifikasi Situs ........................................................................................19

Transcript of DAFTAR ISI -...

Page 1: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

vi

DAFTAR ISI

HALAMAN JUDUL ...............................................................................................i

PENGESAHAN ..................................................................................................... ii

PERNYATAAN .................................................................................................... iii

PERSEMBAHAN...................................................................................................iv

KATA PENGANTAR ........................................................................................... v

DAFTAR ISI ........................................................................................................ vi

DAFTAR TABEL ................................................................................................. x

DAFTAR GAMBAR ........................................................................................... xii

DAFTAR NOTASI ..............................................................................................xvi

INTISARI ..........................................................................................................xviii

BAB I PENDAHULUAN ...................................................................................... 1

1.1 Latar Belakang Masalah ............................................................................. 1

1.2 Rumusan Masalah .......................................................................................3

1.3 Batasan Masalah ........................................................................................ 3

1.4 Keaslian Peneltian ...................................................................................... 4

1.5 Tujuan Penelitian ....................................................................................... 4

1.6 Manfaat Penelitian ..................................................................................... 4

BAB II TINJAUAN PUSTAKA ............................................................................. 5

2.1 Performance Based Design ....................................................................... 5

2.2 Base Isolation …......................................................................................... 7

BAB III LANDASAN TEORI .............................................................................. 12

3.1 Performance Based Design…......................................................................12

3.2 Teori Dinamik Base Isolation.....................................................................14

3.3 Teori Perhitungan Isolator High Damping Rubber Bearing......................16

3.4 Teori Perencanaan Gempa Menurut SNI 03-1726-2012 ..........................18

3.4.1 Gempa Rencana ........................................................................................18

3.4.2 Klasifikasi Situs ........................................................................................19

Page 2: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

vii

3.4.3 Spektrum Respons Desain ..........................................................................19

3.4.4 Parameter Percepatan Gempa Maksimum (MCE) ......................................20

3.4.5 Parameter Spektral Desain (DBE) ..............................................................21

3.4.6 Struktur Penahan Gaya Seismik ..................................................................21

3.4.7 Kombinasi Beban untuk Metode Ultimit ....................................................22

3.4.8 Gaya Lateral Ekivalen.................................................................................23

3.4.9 Gaya Gempa Analisis Spektrum Respon Ragam.........................................24

3.4.10 Gaya Gempa Analisis Respon Riwayat Waktu...........................................24

3.4.11 Pengecekan Torsi Bangunan dan Simpangan Antar Lantai ........................24

3.5 Teori Base Isolation Berdasarkan Peraturan ................................................26

3.5.1 Persayaratan Desain Umum Base Isolation ................................................26

3.5.2 Faktor Modifikasi Properties ......................................................................27

3.5.3 Rekaman Gempa MCE .............................................................................. 27

3.5.4 Pemilihan Prosedur Analisis ......................................................................27

3.5.5 Gaya Lateral Ekivalen................................................................................ 28

3.5.5.1 Perpindahan Maksimum ............................................................................ 28

3.5.5.2 Periode Efektif Pada Saat Perpindahan Maksimum ...................................28

3.5.5.3 Perpindahan Total ......................................................................................29

3.5.5.4 Sistem Isolasi dan Elemen-Elemen Struktural di Bawah Sistem Isolasi ... .30

3.5.5.5 Elemen Struktural di Atas Sistem Isolasi ...................................................30

3.5.5.6 Batas Vs ......................................................................................................31

3.5.6 Analisis Dinamik Spektrum Respon Ragam dan Riwayat Waktu ………..31

3.6 Capacity Spectrum Method (ATC-40)......................................................32

3.6.1 Capacity Curve...........................................................................................33

3.6.2 Spektrum Demand………..........................................................................34

BAB IV ANALISIS DAN PEMBAHASAN ........................................................ 36

4.1 Deskripsi Bangunan ERIC…………….…………….…...............................36

4.2 Rekaman yang Digunakan …………..…….……….…............................... 39

4.3 Metode Penelitian…………………………. ................................................45

Page 3: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

viii

BAB IV HASIL DAN DISKUSI……….…...........................................................50

5.1 Permodelan Struktur………………….…………….…...............................50

5.2 Struktur ERIC Tanpa Base Isolation R4.8……………...…........................ 52

5.2.1 Pengecekan Analisis Modal…………….................................................... 53

5.2.2 Beban Statik Ekivalen (ELF) dan Spektrum Respon Ragam (MRSA).........53

5.2.3 Pemeriksaan Torsi Bangunan, Defleksi dan Simpangan Antar Tingkat ......55

5.2.4 Penulangan Superstructure .........................................................................58

5.2.5 Pemodelan Sendi Plastis .............................................................................60

5.2.6 Pushover Struktur Tanpa Base Isolation Dengan R4.8...............................62

5.2.7 Rasio Simpangan Antar Lantai DBE dan MCE Pushover Struktur R4.8.....63

5.2.8 Analisis Nonlinier Riwayat Waktu Struktur Tanpa Base Isolation R4.8….68

5.3 Struktur ERIC Dengan Base Isolation (BI) .................................................72

5.3.1 Preliminari Ukuran HDRB .........................................................................74

5.3.2 Pemodelan Linier Base Isolation dengan SAP2000 ...................................81

5.3.3 Analisis Base Isolation dengan Modal Response Spectrum Analysis .........83

5.3.4 Pengecekan Simpangan Antar Lantai Base Isolation ................................88

5.3.5 Penulangan Struktur Base Isolation ...........................................................90

5.3.6 Pushover Struktur Base Isolation................................................................93

5.3.7 Rasio Simpangan Antar Lantai Pushover Struktur Base Isolation...........100

5.3.8 Analisis Nonlinier Riwayat Waktu Struktur dengan Base Isolation.…....105

5.3.9 Analisis Uplift dan Perpindahan Pada Base Isolation……………….......113

5.3.10 Struktur Tanpa Base Isolation Menggunakan Hasil Desain UB…….....120

5.3.10.1 Pushover Struktur Tanpa BI Menggunakan Hasil Desain UB………….121

5.3.10.2 Rasio Simpangan Antar Lantai Pushover Struktur R4.8.........................124

5.3.10.3 Analisis NLTHA Struktur Tanpa BI Dengan Hasil Desain BI UB..........127

5.4 Perbandingan Hasil....................................................................................131

5.4.1 Perbandingan Hasil Gaya, Perpindahan dan Level Kinerja CSM...............131

5.4.2 Perbandingan Hasil Rasio Drift Dan Perpindahan Pushover......................133

Page 4: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

ix

5.4.3 Perbandingan Perpindahan, Drift Ratio Dan Level Kinerja Dari NLTHA..135

5.4.4 Perbandingan Volume.................................................................................137

5.4.5 Pengurangan Respon Percepatan dengan Base Isolation............................138

BAB VI KESIMPULAN DAN SARAN ..............................................................140

6.1 Kesimpulan ……........……………………….............................................140

6.2 Saran …………..……………………….....................................................142

DAFTAR PUSTAKA …......................................................................................143

LAMPIRAN …....................................................................................................146

Page 5: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

x

Daftar Tabel

NO Nama Tabel Halaman

2.1

3.1

3.2

3.3

3.4

3.5

3.6

3.7

3.8

3.9

4.1

5.1

5.2

5.3

5.4

5.5

5.6

5.7

5.8

5.9

5.10

5.11

5.12

5.13

5.14

5.15

5.16

5.17

5.18

5.19

5.20

5.21

5.22

5.23

5.24

5.25

5.26

5.27

5.28

5.29

Perbandingan reduksi respon struktur

Level kinerja menurut FEMA 356

Faktor Keutamaan Gempa

Klasifikasi Situs

Koefisien Situs, Fa

Koefisien Situs, Fv

Kategori Desain Seismik Berdasar Respons Percepatan

Pendek

Kategori Desain Seismik Berdasarkan Respons Percepatan 1

Detik

Simpangan ijin antar lantai Δa

Koefisien redaman, 𝛽M

Skala TH dari penskalaan MRSA

Tabel kombinasi pembebanan

Modal Participating Mass Rasio

Pengecekan Irregularity Arah X struktur tanpa BI R4.8

Perhitungan Ax untuk Arah X struktur tanpa BI R4.8 Pengecekan Irregularity Arah Y struktur tanpa BI R4.8 Perhitungan Ax untuk Arah X struktur tanpa BI R4.8

Defleksi dan Simpangan Antar Lantai Arah X Defleksi dan Simpangan Antar Lantai Arah Y

Ukuran dan penulangan kolom tanpa BI R4.8

Penulangan sengkang kolom tanpa BI R4.8

Detail kolom tanpa BI R4.8

Parameter dan batas penerimaan

Pushover struktur tanpa BI dengan R 4.8 Arah X

Pushover struktur tanpa BI dengan R 4.8 Arah Y

Rekapitulasi Hasil Pushover struktur tanpa BI dengan R 4.8

Rasio simpangan antar lantai pushover R4.8 DBE arah X

Rasio simpangan antar lantai pushover R4.8 DBE arah Y

Rasio simpangan antar lantai pushover R4.8 MCE arah X

Rasio simpangan antar lantai pushover R4.8 MCE arah Y

Perpindahan pada lantai Atas

Rekap hasil perpindahan pada puncak struktur

Pemilihan HDRB Menurut Beban Jangka Panjang

Dimensi produk HDRB Bridgestone

Karakteristik HDRB awal (iterasi 1)

Karakteristik HDRB (iterasi 2)

Karakteristik struktur base isolation statik ekivalen

Input masukan linier model pada base isolation

Perpindahan linier BI dari analisis spektrum respon ragam Gaya MRSA untuk Isolator dan Superstructure

10

12

18

19

20

21

21

21

26

28

40

51

53

56

56

57

57

58

58

58

59

59

61

63

64

66

67

67

67

68

68

70

75

76

77

79

80

83

86

88

Page 6: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

xi

5.30

5.31

5.32

5.33

5.34

5.35

5.36

5.37

5.38

5.39

5.40

5.41

5.42

5.43

5.44

5.45

5.46

5.47

5.48

5.49

5.50

5.51

5.52

5.53

5.54

5.55

5.56

5.57

5.58

5.59

5.60

5.61

5.62

5.63

5.64

5.65

5.66

5.67

5.68

5.69

5.70

5.71

5.72

5.73

Defleksi dan Simpangan Antar Lantai BI LB Arah X

Defleksi dan Simpangan Antar Lantai BI LB Arah Y

Defleksi dan Simpangan Antar Lantai BI UB Arah X

Defleksi dan Simpangan Antar Lantai BI UB Arah Y

Ukuran dan penulangan kolom BI

Ukuran sengkang kolom BI

Detail penulangan kolom BI

Ukuran dan Penulangan Balok BI

Karakteristik nonlinier base isolation

Rekapitulasi hasil pushover struktur base isolation

Pushover tumpuan base isolation upper-bound arah X

Pushover tumpuan base isolation upper-bound arah Y

Pushover tumpuan base isolation lower-bound arah X

Pushover tumpuan base isolation lower-bound arah Y Rasio drift pushover BI UB DBE arah X (Step 11)

Rasio drift pushover BI UB DBE arah Y (Step 10) Rasio drift pushover BI UB MCE arah X (Step 18) Rasio drift pushover BI UB MCE arah Y (Step 17)

Rasio drift pushover BI LB DBE arah X (Step 11)

Rasio drift pushover BI LB DBE arah Y (Step 11)

Rasio drift pushover BI LB MCE arah X (Step 18)

Rasio drift pushover BI LB MCE arah Y (Step 18)

Perpindahan pada Lantai Atas

Rekap hasil perpindahan pada puncak struktur

Uplift struktur base isolation

Perpindahan BI pada struktur Base isolation

Rekapitulasi hasil pushover struktur tanpa base isolation

hasil BI UB

Pushover tanpa BI dengan hasil desain Upper-bound arah X

Pushover tanpa BI dengan hasil desain Upper-bound Arah Y

Rasio drift pushover tanpa BI tul. UB DBE arah X(Step 6)

Rasio drift pushover tanpa BI tul. UB DBE arah Y(Step 5)

Rasio drift pushover tanpa BI tul. UB MCE arah X(Step 11)

Rasio drift pushover tanpa BI tul. UB MCE arah Y(Step 11)

Perpindahan pada lantai atas tanpa BI tul.UB

Perpindahan NLTHA Struktur Atas

Perbandingan hasil pushover dengan CSM

Perbandingan rasio simpangan antar lantai pushover DBE

Perbandingan rasio simpangan antar lantai pushover MCE

Perbandingan perpindahan pushover pada lantai atas

Perbandinan perpindahan NLTHA Struktur Atas Perbandingan overall drift rasio NLTHA

Volume struktur tanpa base isolation

Volume struktur dengan base isolation

Pengurangan respon percepatan base isolation

88

89

89

89

91

91

91

92

93

94

94

95

97

98

100

101

101

101

103

103

104

104

105

108

114

114

121

121

123

125

126

126

126

127

129

132

133

134

135

135

136

137

137

138

Page 7: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

xii

Daftar Gambar

No Nama Gambar Halaman

1.1

2.1

2.2

2.3

2.4

2.5

2.6

2.7

2.8

3.1

3.2

3.3

3.4

3.5

3.6

3.7

3.8

3.9

3.10

3.11

3.12

3.13

4.1

4.2

4.3

4.4

4.5

4.6

4.7

4.8

4.9

4.10

4.11

4.12

4.13

4.14

4.15

4.16

4.17

4.18

4.19

Period shift dan damping incresing base isolation

Story shear dan perpindahan gedung Indonesia-1

Perbandingan kapasitas struktur

Perpindaha, drift lantai pertama dan lantai puncak

Simpangan antar tingkat arah X dan Y Syah Kuala

Roof drift terhadap waktu dari gempa Kobe

Simpangan antar lantai dan jumlah sendi plastis

Respon perpindah struktur atas

Drift Sendai MT dan Thousand Tower

Sendi plastis dan histerisis loops akibat gempa

Gambar hubungan gaya-deformasi/rotasi element

Struktur jepit dan dengan base isolation 1 lantai

Prisip dasar penambahan base isolation

Bentuk HDRB dan histerisis loops

Perilaku Bilinear Gaya-Perpindahan

Spektrum Respon Percepatan

Pepindahan untuk faktor pembesaran torsi, Ax

Penentuan simpangan antar lantai

Model bilinier memperhitungkan UB dan LB

Perpindahan desain, maksimum, dan total maksimum

Kurva kapasitas

Spektrum Respon yang Ditampilkan Dalam Format

Tradisional dan ADRS

Rencana tampak 3D gedung ERIC

Denah rencana lantai 1 gedung ERIC

Denah rencana tipikal lantai 2-5 gedung ERIC

Elevasi rencana gedung ERIC

Diagram respon percepatan dilokasi gedung ERIC

Penskalaan spektrum respon Kern Country

Penskalaan rekaman gempa Kern Country arah X

Penskalaan rekaman gempa Kern Country arah Y

Penskalaan respon spektrum Imperial Valley

Penskalaan rekaman gempa Imperial Valley arah X

Penskalaan rekaman gempa Imperial Valley arah Y

Penskalaan repon spektrum Chi-Chi_Taiwan

Penskalaan rekaman gempa Chi-Chi_Taiwan X

Penskalaan rekaman gempa Chi-Chi_Taiwan Y

Data masukan SeismoArtif

Respon spektrum Artificial buatan sesuai RS SNI MCE

Rekaman gempa Artificial X

Rekaman gempa Artificial Y

Bagan alir 1 Basic requirements

2

6

7

8

9

10

10

11

11

13

14

14

15

16

17

20

24

25

26

30

33

35

36

37

37

38

39

41

41

41

41

42

42

42

43

43

44

44

45

45

46

Page 8: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

xiii

4.20

4.21

4.22

5.1

5.2

5.3

5.4

5.5

5.6

5.7

5.8

5.9

5.10

5.11

5.12

5.13

5.14

5.15

5.16

5.17

5.18

5.19

5.20

5.21

5.22

5.23

5.24

5.25

5.26

5.27

5.28

5.29

5.30

5.31

5.32

5.33

5.34

5.35

Bagan alir 2 Desain Struktur Tanpa Base Isolation

Bagan alir 3 Desain Struktur Dengan Base Isolation

Bagan alir 4 Analisis Pushover dan Nonlinier Riwayat

Waktu

Diagram respon percepatan dilokasi gedung ERIC

Model Sap2000 Gedung ERIC tanpa base isolation

Denah ukuran balok tipikal

Analisis modal struktur tanpa base isolation R 4.8

Pengecekan SCWB struktur tanpa BI R4.8

Pengecekan Irregularity arah X dan Y struktur tanpa BI

R4.8

Pengecekan rasio simpangan antar lantai struktur tanpa BI

R4.8

Denah kolom ERIC R4.8

Denah balok tipikal struktur tanpa BI R4.8

Hubungan gaya deformasi sesuai Tabel 4.12

Sendi plastis default SAP 2000 balok dan kolom

CSM struktur tanpa BI dengan R 4.8 arah X DBE

CSM struktur tanpa BI dengan R 4.8 arah X MCE

CSM struktur tanpa BI dengan R 4.8 arah Y DBE

CSM struktur tanpa BI dengan R 4.8 arah Y MCE

Letak sendi plastis pushover DBE dan MCE arah X R4.8

Letak sendi plastis pushover DBE dan MCE arah Y R 4.8

Pengecekan rasio simpangan antar lantai arah X dan Y R

4.8

Displacement histories struktur tanpa BI R4.8 Kern Country

Displacement histories struktur tanpa BI R4.8 Imperial

Valley

Displacement histories struktur tanpa BI R4.8 Artificial

Displacement histories struktur tanpa BI R4.8 Artificial

Kondisi setelah struktur tanpa BI (R4.8) mengalami gempa

Imperial Valley (IO)

Kondisi setelah struktur tanpa BI (R4.8) mengalami gempa

Artificial (O)

Overal drift ratio struktur tanpa BI R4.8 Kern Country (IO)

Overal drift ratio struktur tanpa BI R4.8 Imperial Valley

(IO)

Overal drift ratio struktur tanpa BI R4.8 Artificial (O)

Preliminari ukuran superstructure diatas base isolation

Respon spektrum untuk estimasi superstructure BI

Penempatan preliminari BI

Foto dari HDRB

Spektra perpindahan Rencana Pengecekan perpindahan pada konfigurasi base isolation Hubungan Gaya-Perpindahan dari Struktur Base isolation Input masukan base isolation pada SAP 2000

47

48

49

50

52

52

53

55

56

57

59

60

61

62

63

64

65

65

66

67

68

69

69

70

70

71

71

71

72

72

74

74

76

76

78

79

81

82

Page 9: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

xiv

5.36

5.37

5.38

5.39

5.40

5.41

5.42

5.43

5.44

5.45

5.46

5.47

5.48

5.49

5.50

5.51

5.52

5.53

5.54

5.55

5.56

5.57

5.58

5.59

5.60

5.61

5.62

5.63

5.64

5.65

5.66

5.67

5.68

5.69

Konfigurasi akhir perletakan BI Perpindahan akibat beban Respon Spektrum MCE

Analisis modal struktur dengan base isolation

Pengecekan rasio simpangan antar lantai BI Arah X dan Y

Pengecekan strong column weak beam struktur BI

Denah kolom BI

Denah balok tipikal ERIC BI

CSM struktur BI UB arah X dengan gempa DBE CSM struktur BI UB arah X dengan gempa MCE

CSM struktur BI UB arah Ydengan gempa DBE CSM struktur BI UB arah Y dengan gempa MCE

CSM struktur BI LB arah X dengan gempa DBE

CSM struktur BI LB arah X dengan gempa MCE

CSM struktur BI LB arah Y dengan gempa DBE

CSM struktur BI LB arah Y dengan gempa MCE

Letak Sendi plastis pushover BI UB gempa DBE dan MCE

arah X

Letak Sendi plastis pushover BI UB gempa DBE dan MCE

arah Y

Pengecekan rasio simpangan antar lantai BI UB arah X dan

Y

Letak sendi plastis pushover BI LB gempa DBE dan MCE

arah X

Letak sendi plastis pushover BI LB gempa DBE dan MCE

arah Y

Pengecekan rasio simpangan antar lantai BI LB arah X dan

Y

Displacement Histories BI UB Chi-Chi

Displacement Histories BI UB Imperial Valley

Displacement Histories BI UB Artificial

Displacement Histories BI LB Chi-Chi

Displacement Histories BI LB Imperial Valley

Displacement Histories BI LB Artificial

Kondisi setelah struktur dengan BI UB mengalami gempa

Chi-chi (O)

Kondisi setelah struktur dengan BI UB mengalami gempa

Imperial Valley (O

Kondisi setelah struktur dengan BI UB mengalami gempa

Artificial (O)

Kondisi setelah struktur dengan BI LB mengalami gempa

Chi-chi (O)

Kondisi setelah struktur dengan BI LB mengalami gempa

Imperial Valley (O)

Kondisi setelah struktur dengan BI LB mengalami gempa

Artificial (O)

Overal drift ratio struktur dengan BI UB Artificial (O)

83

84

85

89

90

92

92

95

95

96

96

97

98

99

99

100

101

102

102

103

104

106

106

106

107

107

107

108

109

109

110

110

111

111

Page 10: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

xv

5.70

5.71

5.72

5.73

5.74

5.75

5.76

5.77

5.78

5.79

5.80

5.81

5.82

5.83

5.84

5.85

5.86

5.87

5.88

5.89

5.90

5.91

5.92

5.93

5.94

5.95

5.96

5.97

5.98

5.99

5.100

5.101

5.102

5.103

5.104

5.105

Overal drift ratio struktur dengan BI UB Chi-Chi

Overal drift ratio struktur dengan BI UB Imperial Valley

(O)

Overal drift ratio struktur dengan BI LB Artificial (O)

Overal drift ratio struktur dengan BI LB Chi-chi (O)

Overal drift ratio struktur dengan BI LB Imperial Valley(O)

Perpindahan Artificial terhadap waktu base isolation UB

Perpindahan Imperial Valley terhadap waktu base isolation

UB

Perpindahan Chichi terhadap waktu base isolation UB

Perpindahan Artificial terhadap waktu base isolation LB

Perpindahan Imperial Valley terhadap waktu base isolation

LB

Perpindahan Chichi terhadap waktu base isolation LB

Histerisis loops BI LB akibat gempa Artificial

Histerisis loops BI LB akibat gempa Chi-Chi

Histerisis loops BI LB akibat gempa Imperial Valley

Histerisis loops BI UB akibat gempa Artificial

Histerisis loops BI UB akibat gempa Chi-Chi

Histerisis loops BI UB akibat gempa Imperial Valley

CSM tanpa BI hasil desain BI UB arah X DBE

CSM tanpa BI hasil desain BI UB arah X MCE

CSM tanpa BI hasil desain BI UB arah Y DBE

CSM tanpa BI hasil desain BI UB arah Y MCE

Letak sendi plastis pushover DBE dan MCE arah X tanpa

base isolation hasil desain BI UB

Letak sendi plastis pushover DBE dan MCE arah Y tanpa

base isolation hasil desain BI UB

Pengecekan simpangan antar lantai arah X dan Y tanpa BI

tul.UB

Displacement Histories tanpa BI tul. UB Kern Country

Displacement Histories BI tul. UB Imperial Valley

Displacement Histories tanpa BI tul. UB Artificial

Kondisi setelah struktur tanpa BI tul UB mengalami gempa

Kern Country

Kondisi setelah struktur tanpa BI tul UB mengalami gempa

Imperial Valley

Kondisi setelah struktur tanpa BI tul UB mengalami gempa

Artificial

Overal drift ratio struktur tanpa BI tul UB Kern Country

Overal drift ratio struktur tanpa BI tul UB Imperial Valley

Overal drift ratio struktur tanpa BI tul UB Artificia

Perbadingan gaya dan perpindahan untuk 4 model

Perbadingan rasio simpangan antar lantai pushover DBE

Perbadingan rasio simpangan antar lantai pushover MCE

112

112

112

113

113

116

117

117

117

118

118

118

119

119

119

120

120

122

122

123

123

125

125

126

128

128

128

129

129

130

130

131

131

132

133

134

Page 11: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

xvi

Daftar Notasi

Notasi Keterangan

KM

DM

Tm

Geff

Ar

tr

g

W

t

M

SDS

SD1

T

E

Eh

Ev

ρ

QE

D

V

Wi

hi dan hx

Cs

Wseismic

R

Ie

T

𝐴𝑖̅̅̅

𝐴𝑖

Cd

𝛿xe

Ie

λ(ae)

λ(test)

λ(spec)

SM1

Kekakuan efektif MCE

Perpindahan saat MCE

Periode saat MCE

Modulus geser efektif elastomeric

Luas penampang

Total ketebalan rubber

Frekuensi natural

Gravitasi

Berat seismik efektif struktur di atas sistem isolasi

ketebalan isolator

Damping saat MCE

parameter respons spektral percepatan desain perioda

pendek

parameter respons spektral percepatan desain perioda 1

detik

perioda getar fundamental struktur

Pengaruh beban gempa.

Pengaruh beban gempa horisontal

Pengaruh beban gempa vertical

Faktor redudansi

Pengaruh gaya gempa horisontal dari V

Pengaruh beban mati

Gaya dasar seismik

Bagian berat seismik efektif total struktur

Tinggi dari dasar sampai tingkat I atau x, dinyatakan dalam

meter

Koefisien respon seismik yang ditentukan

Berat efektif struktur

Faktor modifkasi respons

Faktor keutamaan

Periode struktur dasar (detik)

percepatan spektrum TH

percepatan spektrum target

Faktor amplifikasi defleksi

Defleksi pada lokasi yang diisyaratkan dengan analisis

elastis

Faktor keutamaan gempa

Faktor kondisi cuaca dan umur penggunaan

Faktor heating, rate of loading, scragging

Faktor variasi produksi

Parameter percepatan spektral gempa maksimum yang

dipertimbangkan dengan redaman 5 persen pada periode 1

detik dengan satuan g.

Page 12: DAFTAR ISI - etd.repository.ugm.ac.idetd.repository.ugm.ac.id/downloadfile/128844/potongan/S2-2017...vii 3.4.3 Spektrum Respons Desain .....19 3.4.4 Parameter Percepatan Gempa Maksimum

xvii

BM

y

e

b

d

Pt

MPF1

α1

wi/g

i1

N

atap

Sa

Sd

Koefisien numerik terkait dengan redaman efektif sistem

isolasi pada perpindahan maksimum, βM,

Jarak antara titik pusat kekakuan sistem isolasi dan elemen

yang diinginkan, diukur tegak lurus terhadap arah bebean

gempa yang ditinjau

Eksentrisitas

Ukuran denah struktur terpendek diukur tegak lurus terhadap

d.

Ukuran terpanjang denah struktur.

rasio period translasi terhadap rotasi

faktor partisipasi ragam) untuk ragam 1

koefisien massa ragam untuk ragam ke-1

massa lantai i

perpindahan pada lantai i ragam ke-1

jumlah lantai

perpindahan atap (yang digunakan pada kurva kapasitas)

spektrum percepatan

spektrum perpindahan