1. RESOURCE PLANNING

Dalam menentukan sebuah project, maka diperlukan apa resource dan berapa

jumlah yang dibutuhkan untuk menjalankan kegiatan project ini. Resource yang akan

digunakan dalam SEAFE Project terdiri dari 3 macam yaitu man, machine, dan material.

Berikut ini merupakan tabel yang menunjukan resource planning dari SEAFE PROJECT.

Tabel 1.1 Resource Planning SEAFE Project

Resources Quantity Unit

Project Manager 1 eachSecretary 2 eachTrasurer 2 each

Public relation with United Nations 3 eachPublic relation Department - Countries 10 each

Preparation team 8 eachOrganizator developer 10 each

Observer 2 eachFinance staff 1 each

Human Resource Development 7 eachEvent organizer 8 each

Supervisor 2 eachContractor 1 Team Project

Administrative staff 3 eachAdministrative staff 3 eachOutsourcing service 1 eachAdministrative staff 3 each

Contractor 1 Team ProjectProcurement Team 3 each

Laptop ASUS X455 LA 5 eachLCD LG 20M 37A & Proyektor BX275 1 each

Printer & Fax Epson L 210 1 eachLaser pointer 1 eachHandbook 1 each

Komputer ASUS K30 AD 1 eachTelepon Panasonic KX -TS 505 1 each

White Board 60 x 90 cm 1 eachRifle AW-50 5 each

FIM 92-Stinger 5 eachCOLT M4 Carbine 22LR 5 each

M136 AT4 Anti-armor Weapon 5 eachStarblaze Marine Lifeboat 7 each

MEN

MACHINE

Table 1.1 Resource Planning SEAFE Project (continue)

Ticket Jakarta - New York (PP) 6 eachAccomodation in NY 6 each

Rent Kempinski Hotel & Consumption 19 dayPapers A4 70 gr 14 each

Epson Color Ink T6642 14 eachEpson Black Ink T6643 14 each

Spidol 50 eachRent a Ballroom Kempinski Hotel & Consumption 2 day

Building tarrif 1 eachAdministration 1 each

Copying documents 16 eachMonitoring Cost 1000 m2Sempadan Cost 1000 m2

Pen Pilot 6 each

MATERIAL

2. COST ESTIMATION

Untuk mendapatkan cost estimation dari setiap resource yang berupa man,

material, dan machine, maka metode cost estimation yang digunakan adalah metode

analogi. Metode analogi ini digunakan untuk membandingkan cost suatu benda

dengan cost benda lain yang sama/ setipe. Cost dari man, material, dan machine ini

dibandingkan dengan informasi serupa yang didapatkan dari berbagai referensi yang

didapatkan dari media internet.

Tabel 1.2 Cost Estimation of Initial Survey

WBS ID Work Package Men Qty Unit Unit Cost Duration Unit Duration Total Cost Machines Qty Unit Unit Cost Total Cost Materials Qty Unit Unit Cost Total Cost Total Subactivity CostProject Manager 1 each Rp10,000,000.00 0.25 month Rp2,500,000.00 Ticket Jakarta - New York (PP) 6 each Rp42,248,846.00 Rp253,493,076.00

Secretary 2 each Rp4,482,142.00 0.25 month Rp2,241,071.00 Accomodation in NY 6 each Rp2,585,000.00 Rp15,510,000.00Trasurer 1 each Rp6,800,000.00 0.25 month Rp1,700,000.00

Public Relation Department UN 3 each Rp5,000,000.00 0.25 month Rp3,750,000.00

Secretary 1 each Rp4,482,142.00 0.50 month Rp2,241,071.00 LCD LG 20M 37A & Proyektor BX275 1 each Rp6,630,000.00 Rp6,630,000.00

Public Relation Department-Countries 10 each Rp6,600,000.00 0.50 month Rp33,000,000.00 Laptop ASUS X455 LA 5 each Rp5,199,000.00 Rp25,995,000.00Printer & Fax Epson L 210 1 each Rp2,250,000.00 Rp2,250,000.00

1.1.3 Geographical analysis Preparation team 8 each Rp7,500,000.00 0.50 month Rp30,000,000.00 Rp30,000,000.00Project Manager 1 each Rp10,000,000.00 0.75 month Rp7,500,000.00 LCD LG 20M 37A & Proyektor BX275 1 each Rp6,630,000.00 Rp6,630,000.00 Rent Kempinski Hotel & Consumption 2 day Rp22,400,000.00 Rp44,800,000.00

Secretary 1 each Rp4,482,142.00 0.75 month Rp3,361,606.50 Laptop ASUS X455 LA 5 each Rp5,199,000.00 Rp25,995,000.00 Papers A4 70 gr 1 Rim Rp30,000.00 Rp30,000.00

Public Relation Department-Countries 10 each Rp6,600,000.00 0.75 month Rp49,500,000.00 Printer & Fax Epson L 210 1 each Rp2,250,000.00 Rp2,250,000.00 Epson Color Ink T6642 1 Boxes Rp76,000.00 Rp76,000.00

Epson Black Ink T6643 1 Boxes Rp76,000.00 Rp76,000.00

Project Manager 1 each Rp10,000,000.00 1.00 month Rp10,000,000.00 LCD LG 20M 37A & Proyektor BX275 1 each Rp6,630,000.00 Rp6,630,000.00 Rent Kempinski Hotel & Consumption 2 day Rp22,400,000.00 Rp44,800,000.00Secretary 1 each Rp4,482,142.00 1.00 month Rp4,482,142.00 Laptop ASUS X455 LA 5 each Rp5,199,000.00 Rp25,995,000.00 Papers A4 70 gr 1 Rim Rp30,000.00 Rp30,000.00

Public Relation Department UN 3 each Rp5,000,000.00 1.00 month Rp15,000,000.00 Printer & Fax Epson L 210 1 each Rp2,250,000.00 Rp2,250,000.00 Epson Color Ink T6642 1 Boxes Rp76,000.00 Rp76,000.00

Public Relation Department-Countries 10 each Rp6,600,000.00 1.00 month Rp66,000,000.00 Epson Black Ink T6643 1 Boxes Rp76,000.00 Rp76,000.00

Organization Developer 10 each Rp5,000,000.00 0.50 month Rp25,000,000.00

Public Relation Department-Countries 10 each Rp6,600,000.00 0.50 month Rp33,000,000.00

Rp25,995,000.00 Rp305,189,147.00

1.1.2.1 List all security organization owned by country Rent Kempinski Hotel & Consumption 1 day Rp22,400,000.00 Rp22,400,000.00 Rp92,516,071.00

1.1.1 Consolidation with UN Laptop ASUS X455 LA 5 each Rp5,199,000.00

1.1.4.1 Hold a meeting with all countries involved Rp140,218,606.50

1.1.4.2 Hold a meeting with UN

1.1.4.3 Determining organization scope

Rp175,339,142.00

Rp58,000,000.00

Tabel 1.3 Cost Estimation of Establishing Partnership and Making Agreement

WBS ID Work Package Men Qty Unit Unit Cost Duration Unit Duration Total Cost Machines Qty Unit Unit Cost Total Cost Materials Qty Unit Unit Cost Total Cost Total Subactivity CostObserver 2 each 7,500,000Rp 1 weeks 15,000,000.00Rp Laptop ASUS X455LA 2 each 5,199,000.00Rp 10,398,000.00Rp Papers A4 70 gr 1 Rim 30,000.00Rp 30,000.00Rp

Secretary 2 1 each 4,482,142Rp 1 weeks 4,482,142.00Rp Laptop ASUS X455LA 1 each 5,199,000.00Rp 5,199,000.00Rp Epson Color Ink T6642 1 Boxes 76,000.00Rp 76,000.00Rp Printer Epson L210 1 each 2,250,000.00Rp 2,250,000.00Rp Epson Black Ink T6643 1 Boxes 76,000.00Rp 76,000.00Rp

Public Relation Department-UN 1 each 5,000,000Rp 0.5 weeks 625,000.00Rp Laptop ASUS X455LA 1 each 5,199,000.00Rp 5,199,000.00Rp

Secretary 2 1 each 4,482,142Rp 0.5 weeks 2,241,071.00Rp Laptop ASUS X455LA 1 each 5,199,000.00Rp 5,199,000.00Rp Epson Color Ink T6642 1 Boxes 76,000.00Rp 76,000.00Rp

Printer Epson L210 1 each 2,250,000.00Rp 2,250,000.00Rp Epson Black Ink T6643 1 Boxes 76,000.00Rp 76,000.00Rp Papers A4 70 gr 1 Rim 30,000.00Rp 30,000.00Rp

Public Relation Department-Countries 1 each 6,600,000Rp 0.75 weeks 4,950,000.00Rp Laptop ASUS X455LA 1 each 5,199,000.00Rp 5,199,000.00Rp Laser pointer 1 each 372,000.00Rp 372,000.00Rp

Secretary 1 each 4,482,142Rp 0.75 weeks 3,361,606.50Rp Laptop ASUS X455LA 1 each 5,199,000.00Rp 5,199,000.00Rp Papers A4 70 gr 1 Rim 30,000.00Rp 30,000.00Rp

Printer Epson L210 1 each 2,250,000.00Rp 2,250,000.00Rp Epson Color Ink T6642 1 Boxes 76,000.00Rp 76,000.00Rp

Epson Black Ink T6643 1 Boxes 76,000.00Rp 76,000.00Rp

Treasurer 1 each 6,800,000Rp 0.75 weeks 5,100,000.00Rp Laptop ASUS X455LA 1 each 5,199,000.00Rp 5,199,000.00Rp Papers A4 70 gr 1 Rim 30,000.00Rp 30,000.00Rp Laser pointer 1 each 372,000.00Rp 372,000.00Rp Epson Color Ink T6642 1 Boxes 76,000.00Rp 76,000.00Rp Handbook 1 each 75,000.00Rp 75,000.00Rp Epson Black Ink T6643 1 Boxes 76,000.00Rp 76,000.00Rp

Finance staff 1 each 2,500,000Rp 0.75 weeks 1,875,000.00Rp Laptop ASUS X455LA 1 each 5,199,000.00Rp 5,199,000.00Rp

Printer Epson L210 1 each 2,250,000.00Rp 2,250,000.00Rp

Organization Developer 1 10 each 5,000,000Rp 1 weeks 50,000,000.00Rp Laptop ASUS X455LA 1 each 5,199,000.00Rp 5,199,000.00Rp Papers A4 70 gr 1 Rim 30,000.00Rp 30,000.00Rp

Organization Developer 2 10 each 5,000,000Rp 1 weeks 50,000,000.00Rp Laptop ASUS X455LA 1 each 5,199,000.00Rp 5,199,000.00Rp Epson Color Ink T6642 1 Boxes 76,000.00Rp 76,000.00Rp

Secretary 1 each 4,482,142Rp 1 weeks 4,482,142.00Rp Printer Epson L210 1 each 2,250,000.00Rp 2,250,000.00Rp Epson Black Ink T6643 1 Boxes 76,000.00Rp 76,000.00Rp

Laptop ASUS X455LA 1 each 5,199,000.00Rp 5,199,000.00Rp

List future organization members from each countries in SEAFE Project

Delegation fixation Rp110,398,000.00

1.2.1.1

1.2.2

1.2.3.1

1.2.3.2

1.2.3.3

Rp37,511,142.00

Further consolidation with UN Rp 5,824,000.00

Organize MOU with all countries involved Rp21,331,606.50

Reach an agreement about funding from each countries involved with UN Rp18,002,000.00

Tabel 1.4 Cost Estimation of Organization Forming

WBS ID Work Package Men Qty Unit Unit Cost Duration Unit Duration Total Cost Machines Qty Unit Unit Cost Total Cost Materials Qty Unit Unit Cost Total Cost Total Subactivity CostKomputer ASUS K30 AD 1 each Rp6,000,000.00 Rp6,000,000.00 HVS Paper A4 70gram 1 Rim Rp30,000.00 Rp30,000.00Laptop ASUS X455 LA 5 each Rp5,199,000.00 Rp25,995,000.00 Epson Color Ink 1 Boxes Rp76,000.00 Rp76,000.00

Printer & Fax Epson L 210 1 each Rp2,250,000.00 Rp2,250,000.00 Epson Black Ink 1 Boxes Rp76,000.00 Rp76,000.00

Telepon Panasonic KX -TS 505 1 each Rp399,000.00 Rp399,000.00Spidol Whiteborad

Snowman10 each Rp6,000.00 Rp60,000.00

White Board 60 x 90 cm 1 each Rp144,750.00 Rp144,750.00Rent a Kempinski Hotel

& Consumption4 day Rp22,400,000.00 Rp89,600,000.00

LCD LG 20M 37A & Proyektor BX275 1 each Rp6,630,000.00 Rp6,630,000.00 HVS Paper A4 70gram 1 Rim Rp30,000.00 Rp30,000.00Laptop ASUS X455 LA 5 each Rp5,199,000.00 Rp25,995,000.00 Epson Color Ink 1 Boxes Rp76,000.00 Rp76,000.00

Printer & Fax Epson L 210 1 each Rp2,250,000.00 Rp2,250,000.00 Epson Black Ink 1 Boxes Rp76,000.00 Rp76,000.00

White Board 60 x 90 cm 1 each Rp144,750.00 Rp144,750.00Spidol Whiteborad

Snowman10 each Rp6,000.00 Rp60,000.00

Rent Kempinski Hotel & Consumption

4 day Rp22,400,000.00 Rp89,600,000.00

LCD LG 20M 37A & Proyektor BX275 1 each Rp6,630,000.00 Rp6,630,000.00 HVS Paper A4 70gram 1 Rim Rp30,000.00 Rp30,000.00Laptop ASUS X455 LA 5 each Rp5,199,000.00 Rp25,995,000.00 Epson Color Ink 1 Boxes Rp76,000.00 Rp76,000.00

Printer & Fax Epson L 210 1 each Rp2,250,000.00 Rp2,250,000.00 Epson Black Ink 1 Boxes Rp76,000.00 Rp76,000.00

White Board 60 x 90 cm 1 each Rp144,750.00 Rp144,750.00Spidol Whiteborad

Snowman10 each Rp6,000.00 Rp60,000.00

Rent Kempinski Hotel & Consumption

3 day Rp22,400,000.00 Rp67,200,000.00

Certificates 50 each Rp2,500.00 Rp125,000.00

Confetti 4 each Rp12,500.00 Rp50,000.00Rent a Ballroom

Kempinski Hotel & Consumption

1 day Rp33,600,000.00 Rp33,600,000.00

LCD LG 20M 37A & Proyektor BX275 1 each Rp6,630,000.00 Rp6,630,000.00 HVS Paper A4 70gram 1 Rim Rp30,000.00 Rp30,000.00Laptop ASUS X455 LA 5 each Rp5,199,000.00 Rp25,995,000.00 Epson Color Ink 1 Boxes Rp76,000.00 Rp76,000.00

Printer & Fax Epson L 210 1 each Rp2,250,000.00 Rp2,250,000.00 Epson Black Ink 1 Boxes Rp76,000.00 Rp76,000.00

White Board 60 x 90 cm 1 each Rp144,750.00 Rp144,750.00Spidol Whiteborad

Snowman10 each Rp6,000.00 Rp60,000.00

Rent Kempinski Hotel & Consumption

3 day Rp22,400,000.00 Rp67,200,000.00

LCD LG 20M 37A & Proyektor BX275 1 each Rp6,630,000.00 Rp6,630,000.00 HVS Paper A4 70gram 1 Rim Rp30,000.00 Rp30,000.00Laptop ASUS X455 LA 5 each Rp5,199,000.00 Rp25,995,000.00 Epson Color Ink 1 Boxes Rp76,000.00 Rp76,000.00

Printer & Fax Epson L 210 1 each Rp2,250,000.00 Rp2,250,000.00 Epson Black Ink 1 Boxes Rp76,000.00 Rp76,000.00

White Board 60 x 90 cm 1 each Rp144,750.00 Rp144,750.00Spidol Whiteborad

Snowman10 each Rp6,000.00 Rp60,000.00

Rent Kempinski Hotel & Consumption

3 day Rp22,400,000.00 Rp67,200,000.00

Placard 1 each Rp200,000.00 Rp200,000.00Confetti 4 each Rp12,500.00 Rp50,000.00

1 Month Rp50,000,000.00 Rp91,660,750.00

1.3.1.2 Staffing Human Resource Development 7 each Rp7,503,251.00

1.3.1.1 Forming organization structure Organization Developer 10 each Rp5,000,000.00

2 Month Rp105,045,514.00 Rp140,307,264.00

1.3.1.3 Establish main tasks, responsibility, and rights for each position Organization Developer 10 each Rp5,000,000.00 2 Month Rp100,000,000.00 Rp135,261,750.00

1.3.1.4 Inaguration of SEAFE Members Event organizer 8 each Rp7,000,000.00 0.25 Month Rp14,000,000.00

Rp47,775,000.00

1.3.2 Establish organizational objective, vision, and mission Organization Developer 10 each

8 each

Rp5,000,000.00 2 Month Rp100,000,000.00 Rp135,261,750.00

1.3.3 Establish SOP Organization Developer 10 each

Rp75,850,000.00Rent a Ballroom

Kempinski Hotel & 1 day Rp33,600,000.00

Rp5,000,000.00 2 Month Rp100,000,000.00 Rp135,261,750.00

Rp33,600,000.00

LCD LG 20M 37A & Proyektor BX275 1 each Rp6,630,000.00 Rp6,630,000.00

Rp7,000,000.00 0.75 Month Rp42,000,000.001.3.4 Inaguration of SEAFE Event organizer

Tabel 1.5 Cost Estimation of Bulding Infrastructure

WBS ID Work Package Men Qty Unit Unit Cost Duration Unit Duration Total Cost Machines Qty Unit Unit Cost Total Cost Materials Qty Unit Unit Cost Total Cost Total Subactivity Cost1.4.1 Establish location of main office Contractor 1 Team Project Rp13,000,000,000.00 1.5 month Rp13,000,000,000.00 0 0 0 0 0 Rp13,000,000,000.00

Building tarrif 1 ea Rp2,753,940,000.00 Rp2,753,940,000.00Administration 1 ea Rp605,866,800.00 Rp605,866,800.00

Copying documents 8 ea Rp100,000.00 Rp800,000.00

Administrative staff 3 ea Rp2,000,000.00 0.5 month Rp3,000,000.00

Biaya Pengawasan 1000 m2 Rp800.00 Rp800,000.00Biaya Sempadan 1000 m2 Rp400.00 Rp400,000.00

Copying Documents 8 ea Rp100,000.00 Rp800,000.00

Rifle AW-50 5 ea Rp144,485,000.00 Rp722,425,000.00FIM 92-Stinger 5 ea Rp578,380,000.00 Rp2,891,900,000.00

COLT M4 Carbine 22LR

5 ea Rp7,479,505.00 Rp37,397,525.00

M136 AT4 Anti-armor Weapon

5 ea Rp19,462,000.00 Rp97,310,000.00

Starblaze Marine Lifeboat

7 ea Rp39,435,000.00 Rp276,045,000.00

Rp3,363,606,800.00

1.4.2.2 Administering UKL/UPL (Upaya Pengelolaan

Lingkungan Hidup dan Upaya Pemanfaatan Lingkungan hidup)

0 0 Rp23,000,000.00Outsourcing service 1 ea Rp20,000,000.00

01.4.2.1 Administering "Izin Pemanfaatan Ruang" licensing Administrative staff 3 ea Rp2,000,000.00 0.5 month Rp3,000,000.00

Building main office (handled by another project team) Contractor 1 Team ProjectIncluding in subactivity

1

0.5 month Rp20,000,000.00

1.4.2.3 Administering IMB (Izin Mendirikan Bangunan) Administrative staff 3 ea Rp2,000,000.00 0.5

2 month 30000000 0 Rp4,055,077,525.001.4.4 Providing infrastructures Procurement Team 3 ea Rp5,000,000.00

6 monthIncluding in subactivity

10 0 Including in subactivity 1

month Rp3,000,000.00 0 Rp5,000,000.00

1.4.3

Tabel 1.6 Cost Estimation of Precomissioning and Comissioning

WBS ID Work Package Men Qty Unit Unit Cost Duration Unit Duration Total Cost Machines Qty Unit Unit Cost Total Cost Materials Qty Unit Unit Cost Total Cost Total Subactivity CostLaptop ASUS X455 LA 2 each 5,199,000.00Rp 10,398,000.00Rp HVS Paper A4 70 Gr 1 rim 30,000.00Rp 30,000.00Rp

LCD LG 20M37A & Proyektor BX275 1 each 6,630,000.00Rp 6,630,000.00Rp Pen Pilot 3 each 1,500.00Rp 4,500.00Rp Epson Black Ink 1 boxes 76,000.00Rp 76,000.00Rp

Epson Color Ink 1 boxes 76,000.00Rp 76,000.00Rp

Laptop ASUS X455 LA 2 each 5,199,000.00Rp 10,398,000.00Rp HVS Paper A4 70 Gr 1 rim 30,000.00Rp 30,000.00Rp

LCD LG 20M37A & Proyektor BX275 1 each 6,630,000.00Rp 6,630,000.00Rp Pen Pilot 3 each 1,500.00Rp 4,500.00Rp Epson Black Ink 1 boxes 76,000.00Rp 76,000.00Rp Epson Color Ink 1 boxes 76,000.00Rp 76,000.00Rp

66,964,500.00Rp Printer Epson L210 1 each 2,250,000.00Rp 2,250,000.00Rp

1.5.1 Precommissioning Supervisor 1 month 9,500,000.00Rp

1.5.2 Commissioning Supervisor 1 month 9,500,000.00Rp

5 month 47,500,000.00Rp

4 month 38,000,000.00Rp 57,464,500.00Rp

Printer Epson L210 1 each 2,250,000.00Rp 2,250,000.00Rp

Tabel 1.7 Total Cost All Activity

WBS ID Work Package Men Qty Unit Unit Cost DurationUnit

DurationTotal Cost Machines Qty Unit Unit Cost Total Cost Materials Qty Unit Unit Cost Total Cost Total Subactivity Cost

Project Manager 1 each Rp10,000,000.00 0.25 month Rp2,500,000.00 Ticket Jakarta - New York (PP) 6 each Rp42,248,846.00 Rp253,493,076.00Secretary 2 each Rp4,482,142.00 0.25 month Rp2,241,071.00Trasurer 1 each Rp6,800,000.00 0.25 month Rp1,700,000.00

Public Relation Department UN 3 each Rp5,000,000.00 0.25 month Rp3,750,000.00Secretary 1 each Rp4,482,142.00 0.50 month Rp2,241,071.00

Printer & Fax Epson L 210 1 each Rp2,250,000.00 Rp2,250,000.001.1.3 Geographical analysis Preparation team 8 each Rp7,500,000.00 0.50 month Rp30,000,000.00 Rp30,000,000.00

Project Manager 1 each Rp10,000,000.00 0.75 month Rp7,500,000.00 Rent Kempinski Hotel & Consumption 2 day Rp22,400,000.00 Rp44,800,000.00Secretary 1 each Rp4,482,142.00 0.75 month Rp3,361,606.50 Papers A4 70 gr 1 Rim Rp30,000.00 Rp30,000.00

Epson Color Ink T6642 1 Boxes Rp76,000.00 Rp76,000.00Epson Black Ink T6643 1 Boxes Rp76,000.00 Rp76,000.00

Project Manager 1 each Rp10,000,000.00 1.00 month Rp10,000,000.00 Rent Kempinski Hotel & Consumption 2 day Rp22,400,000.00 Rp44,800,000.00Secretary 1 each Rp4,482,142.00 1.00 month Rp4,482,142.00 Papers A4 70 gr 1 Rim Rp30,000.00 Rp30,000.00

Public Relation Department UN 3 each Rp5,000,000.00 1.00 month Rp15,000,000.00 Epson Color Ink T6642 1 Boxes Rp76,000.00 Rp76,000.00Public Relation Department-Countries 10 each Rp6,600,000.00 1.00 month Rp66,000,000.00 Epson Black Ink T6643 1 Boxes Rp76,000.00 Rp76,000.00

Organization Developer 10 each Rp5,000,000.00 0.50 month Rp25,000,000.00Public Relation Department-Countries 10 each Rp6,600,000.00 0.50 month Rp33,000,000.00

Observer 2 each Rp7,500,000.00 1 weeks Rp15,000,000.00 Papers A4 70 gr 1 Rim Rp30,000.00 Rp30,000.00Epson Color Ink T6642 1 Boxes Rp76,000.00 Rp76,000.00Epson Black Ink T6643 1 Boxes Rp76,000.00 Rp76,000.00

Epson Black Ink T6643 1 Boxes Rp76,000.00 Rp76,000.00Papers A4 70 gr 1 Rim Rp30,000.00 Rp30,000.00

Epson Color Ink T6642 1 Boxes Rp76,000.00 Rp76,000.00Epson Black Ink T6643 1 Boxes Rp76,000.00 Rp76,000.00

Papers A4 70 gr 1 Rim Rp30,000.00 Rp30,000.00

Organization Developer 10 each Rp5,000,000.00 1 weeks Rp50,000,000.00 Papers A4 70 gr 1 Rim Rp30,000.00 Rp30,000.00Organization Developer 10 each Rp5,000,000.00 1 weeks Rp50,000,000.00 Epson Color Ink T6642 1 Boxes Rp76,000.00 Rp76,000.00

HVS Paper A4 70gram 1 Rim Rp30,000.00 Rp30,000.00Epson Color Ink 1 Boxes Rp76,000.00 Rp76,000.00Epson Black Ink 1 Boxes Rp76,000.00 Rp76,000.00

HVS Paper A4 70gram 1 Rim Rp30,000.00 Rp30,000.00Epson Color Ink 1 Boxes Rp76,000.00 Rp76,000.00Epson Black Ink 1 Boxes Rp76,000.00 Rp76,000.00

Spidol Whiteborad Snowman 10 each Rp6,000.00 Rp60,000.00Rent Kempinski Hotel & Consumption 4 day Rp22,400,000.00 Rp89,600,000.00

White Board 60 x 90 cm 1 each Rp144,750.00 Rp144,750.00

Spidol Whiteborad Snowman

Rp76,000.00 Rp76,000.00

0

10 each Rp6,000.00 Rp60,000.00

Rent a Kempinski Hotel & Consumption 4 day Rp22,400,000.00 Rp89,600,000.00

Komputer ASUS K30 AD 1 each Rp6,000,000.00 Rp6,000,000.00

Telepon Panasonic KX -TS 505 1 each Rp399,000.00 Rp399,000.00

weeks Rp4,482,142.00 Epson Black Ink T6643 1 BoxesSecretary 1 each Rp4,482,142.00 1

Epson Black Ink T6643 1 Boxes Rp76,000.00 Rp76,000.00

Epson Color Ink T6642 1 Boxes Rp76,000.00 Rp76,000.00weeks Rp5,100,000.00

Finance staff 1 each Rp2,500,000.00 0.75 weeks Rp1,875,000.00

Treasurer 1 each Rp6,800,000.00 0.75

Rp30,000.00weeks Rp4,950,000.00

Secretary 1 each Rp4,482,142.00 0.75 weeks Rp3,361,606.50

Public Relation Department-Countries 1 each Rp6,600,000.00 0.75

each Rp4,482,142.00 0.5 weeks Rp2,241,071.00

Papers A4 70 gr 1 Rim Rp30,000.00

Rp58,000,000.00

0Secretary 2 1 each Rp4,482,142.00 1 weeks Rp4,482,142.00

0

Printer & Fax Epson L 210Public Relation Department-Countries 10 each Rp6,600,000.00 0.75 month Rp49,500,000.00

1 each Rp2,250,000.00 Rp2,250,000.00

0

Month

0

0

0

0

0

Rp140,464,142.00

Forming organization structure Rp139,842,000.00

Rp194,887,514.00Staffing

Organization Developer 10 each Rp5,000,000.00

Rp105,045,514.00

Rp50,000,000.00

Human Resource Development 7 each Rp7,503,251.00

1

2

Month

Further consolidation with UN

Rp104,664,142.00

Rp19,664,142.00

Rp3,816,208,871.00

Organize MOU with all countries involved

Reach an agreement about funding from each countries involved with UN

List future organization members from each countries in SEAFE Project

Rp7,157,000.00

Rp8,493,606.50

Delegation fixation

Public Relation Department-UN 1 each Rp5,000,000.00 0.5 Epson Color Ink T6642 1 Boxes Rp76,000.00 Rp76,000.00weeks Rp625,000.00

Secretary 2 1

Laptop ASUS X455 LA 5Consolidation with UN

LCD LG 20M 37A & Proyektor BX275 1 each Rp6,630,000.00 Rp6,630,000.00Public Relation Department-Countries 10 each Rp6,600,000.00

1.3.1.1

1.3.1.2

0.50 month Rp33,000,000.00

0

1

Rp305,189,147.00

Rent Kempinski Hotel & Consumption

1.1.1

1.1.2.1

1.1.4.1

Rp96,521,071.00

Rp107,593,606.50

day Rp22,400,000.00 Rp22,400,000.00

Determining organization scope

each Rp5,199,000.00 Rp25,995,000.00

List all security organization owned by country

Hold a meeting with all countries involved

Hold a meeting with UN

Accomodation in NY 6 each Rp2,585,000.00 Rp15,510,000.00

1.1.4.2

1.1.4.3

1.2.1.1

1.2.2

1.2.3.1

1.2.3.2

1.2.3.3

Tabel 1.7 Total Cost All Activity (lanjutan)

WBS ID Work Package Men Qty Unit Unit Cost DurationUnit

DurationTotal Cost Machines Qty Unit Unit Cost Total Cost Materials Qty Unit Unit Cost Total Cost Total Subactivity Cost

HVS Paper A4 70gram 1 Rim Rp30,000.00 Rp30,000.00Epson Color Ink 1 Boxes Rp76,000.00 Rp76,000.00Epson Black Ink 1 Boxes Rp76,000.00 Rp76,000.00

Spidol Whiteborad Snowman 10 each Rp6,000.00 Rp60,000.00Rent Kempinski Hotel & Consumption 3 day Rp22,400,000.00 Rp67,200,000.00

Certificates 50 each Rp2,500.00 Rp125,000.00Confetti 4 each Rp12,500.00 Rp50,000.00

Rent a Ballroom Kempinski Hotel & Consumption

1 day Rp33,600,000.00 Rp33,600,000.00

HVS Paper A4 70gram 1 Rim Rp30,000.00 Rp30,000.00Epson Color Ink 1 Boxes Rp76,000.00 Rp76,000.00Epson Black Ink 1 Boxes Rp76,000.00 Rp76,000.00

Spidol Whiteborad Snowman 10 each Rp6,000.00 Rp60,000.00Rent Kempinski Hotel & Consumption 3 day Rp22,400,000.00 Rp67,200,000.00

HVS Paper A4 70gram 1 Rim Rp30,000.00 Rp30,000.00Epson Color Ink 1 Boxes Rp76,000.00 Rp76,000.00Epson Black Ink 1 Boxes Rp76,000.00 Rp76,000.00

Spidol Whiteborad Snowman 10 each Rp6,000.00 Rp60,000.00Rent Kempinski Hotel & Consumption 3 day Rp22,400,000.00 Rp67,200,000.00

Placard 1 each Rp200,000.00 Rp200,000.00Confetti 4 each Rp12,500.00 Rp50,000.00

1.4.1 Establish location of main office Contractor 1Team

ProjectRp13,000,000,000.00 1.5 month Rp13,000,000,000.00 0 0 0 Rp0.00 Rp0.00 Rp13,000,000,000.00

Building tarrif 1 ea Rp2,753,940,000.00 Rp2,753,940,000.00Administration 1 ea Rp605,866,800.00 Rp605,866,800.00

Copying documents 8 ea Rp100,000.00 Rp800,000.00Administrative staff 3 ea Rp2,000,000.00 0.5 month Rp3,000,000.00

Biaya Pengawasan 1000 m2 Rp800.00 Rp800,000.00Biaya Sempadan 1000 m2 Rp400.00 Rp400,000.00

Copying Documents 8 ea Rp100,000.00 Rp800,000.00

Rifle AW-50 5 ea Rp144,485,000.00 Rp722,425,000.00FIM 92-Stinger 5 ea Rp578,380,000.00 Rp2,891,900,000.00

COLT M4 Carbine 22LR 5 ea Rp7,479,505.00 Rp37,397,525.00M136 AT4 Anti-armor Weapon 5 ea Rp19,462,000.00 Rp97,310,000.00

Starblaze Marine Lifeboat 7 ea Rp39,435,000.00 Rp276,045,000.00HVS Paper A4 70 Gr 1 rim Rp30,000.00 Rp30,000.00

Pen Pilot 3 each Rp1,500.00 Rp4,500.00Epson Black Ink 1 boxes Rp76,000.00 Rp76,000.00Epson Color Ink 1 boxes Rp76,000.00 Rp76,000.00

HVS Paper A4 70 Gr 1 rim Rp30,000.00 Rp30,000.00Pen Pilot 3 each Rp1,500.00 Rp4,500.00

Epson Black Ink 1 boxes Rp76,000.00 Rp76,000.00Epson Color Ink 1 boxes Rp76,000.00 Rp76,000.00

0 Rp38,186,500.001.5.2 Commissioning Supervisor 1 month Rp9,500,000.00 4 month Rp38,000,000.00

0 Rp4,055,077,525.00

1.5.1 Precommissioning Supervisor 1 month Rp9,500,000.00 5 month Rp47,500,000.00 0 Rp47,686,500.00

1.4.4 Providing infrastructures Procurement Team 3 ea Rp5,000,000.00 2 month Rp30,000,000.00

0 Rp5,000,000.00

1.4.3 Building main office (handled by

another project team)Contractor 1

Team Project

Including in subactivity 1 6 month Including in subactivity 1 0 0 Including in subactivity 1

1.4.2.3 Administering IMB (Izin Mendirikan

Bangunan) Administrative staff 3 ea Rp2,000,000.00 0.5 month Rp3,000,000.00

1.4.2.2 Administering UKL/UPL (Upaya Pengelolaan Lingkungan Hidup dan

Upaya Pemanfaatan Lingkungan hidup)0 0 Rp23,000,000.00

Outsourcing service 1 ea Rp20,000,000.00 0.5 month Rp20,000,000.00

0 Rp75,850,000.00Rent a Ballroom Kempinski Hotel &

Consumption1 day Rp33,600,000.00 Rp33,600,000.00

0

1.4.2.1 Administering "Izin Pemanfaatan

Ruang" licensingAdministrative staff 3 ea Rp2,000,000.00 0.5 month Rp3,000,000.00 0 Rp3,363,606,800.00

1.3.4 Inaguration of SEAFE Event organizer 8 each Rp7,000,000.00 0.75 Month Rp42,000,000.00

0 Rp167,442,000.00

1.3.3 Establish SOP Organization Developer 10 each Rp5,000,000.00 2 Month Rp100,000,000.00 0 Rp167,442,000.00

1.3.2Establish organizational objective, vision,

and missionOrganization Developer 10 each Rp5,000,000.00 2 Month Rp100,000,000.00

0 Rp167,442,000.00

1.3.1.4 Inaguration of SEAFE Members Event organizer 8 each Rp7,000,000.00 0.25 Month Rp14,000,000.00 0 Rp47,775,000.00

1.3.1.3Establish main tasks, responsibility, and

rights for each positionOrganization Developer 10 each Rp5,000,000.00 2 Month Rp100,000,000.00

`

3. COST BUDGETING

Setelah mengetahui resource planning dan cost estimating, tahap yang

selanjutnya dilakukan adalah membuat budget dari biaya yang dibutuhkan. Oleh

karena itu, digunakan Kurva S untuk menentukan total komulatif biaya yang

dibutuhkan untuk menjalankan project SEAFE ini.

Tabel 1.8 Baseline cost and Cumulative cost

Week Baseline Cost Cumulative Cost Week Baseline Cost Cumulative CostWeek 0 61037829,4 61037829,4 Week 36 295194272,6 15944586521Week 1 253803424,7 314841254,1 Week 37 292449721,2 16237036242Week 2 48260535,5 363101789,6 Week 38 291763583,3 16528799825Week 3 41608428,4 404710218 Week 39 291763583,3 16820563409Week 4 15000000 419710218 Week 40 291763583,3 17112326992Week 5 47864535,5 467574753,5 Week 41 291763583,3 17404090575Week 6 177077177,5 644651931 Week 42 291763583,3 17695854159Week 7 58316035,5 702967966,5 Week 43 291763583,3 17987617742Week 8 29000000 731967966,5 Week 44 291763583,3 18279381325Week 9 9732828,4 741700794,9 Week 45 313239383,3 18592620709

Week 10 4916035,5 746616830,4 Week 46 297132533,3 18889753242Week 11 4916035,5 751532865,9 Week 47 291763583,3 19181516825Week 12 4916035,5 756448901,4 Week 48 291763583,3 19473280409Week 13 1527466756 2283915657 Week 49 291763583,3 19765043992Week 14 1908104436 4192020092 Week 50 291763583,3 20056807575Week 15 383885848,8 4575905941 Week 51 291763583,3 20348571159Week 16 2831202,17 4578737143 Week 52 291763583,3 20640334742Week 17 2831202,17 4581568346 Week 53 291763583,3 20932098325Week 18 2474773,76 4584043119 Week 54 291763583,3 21223861909Week 19 2385666,67 4586428786 Week 55 291763583,3 21515625492Week 20 2385666,67 4588814453 Week 56 291763583,3 21807389075Week 21 888076628,4 5476891081 Week 57 480604669,2 22287993745Week 22 1109499369 6586390450 Week 58 527814940,6 22815808685Week 23 1109499369 7695889819 Week 59 527814940,6 23343623626Week 24 1109499369 8805389188 Week 60 527814940,6 23871438566Week 25 1116534940 9921924128 Week 61 527814940,6 24399253507Week 26 1118293833 11040217961 Week 62 531297407,3 24930550914Week 27 1597069887 12637287848 Week 63 532168024 25462718938Week 28 1716763900 14354051748 Week 64 532168024 25994886962Week 29 372041531,4 14726093279 Week 65 108341064,8 26103228027Week 30 35860939,25 14761954219 Week 66 2384325 26105612352Week 31 28660939,25 14790615158 Week 67 2384325 26107996677Week 32 26860939,25 14817476097 Week 68 2384325 26110381002Week 33 241527605,9 15059003703 Week 69 2384325 26112765327Week 34 295194272,6 15354197976 Week 70 2384325 26115149652Week 35 295194272,6 15649392248 Week 71 2384325 26117533977

`

Tabel 1.8 Baseline cost and Cumulative cost

Week Baseline Cost Cumulative CostWeek 72 2384325 26119918302Week 73 2384325 26122302627Week 74 2384325 26124686952Week 75 2384325 26127071277Week 76 2384325 26129455602Week 77 2384325 26131839927Week 78 2384325 26134224252Week 79 2384325 26136608577Week 80 2384325 26138992902Week 81 2384325 26141377227

Berdasarkan tabel 1.7 dan tabel 1.8, maka didapatkan data yang digunakan

untuk mendapatkan S-Curve dari SEAFE Project ini. S-Curve dari SEAFE Project

dapat dilihat pada Gambar 1.1 berikut ini.

Gambar 1.1 Kurva-S

Gambar 1.1 diatas merupakan S-Curve dari SEAFE Project yang akan berjalan selama 2

tahun. S-Curve disajikan dalam satuan per minggu untuk memudahkan pemantauan biaya

selama proyek berlangsung. Pada minggu ke-65, grafik terlihat cenderung stabil. Hal ini

dikarenakan biaya yang dikeluarkan mulai minggu ke-65 cenderung kecil apabila

dibandingkan dengan biaya komulatif total sehingga grafik terlihat stabil.

Gambar 1.2 Cash Flow Diagram

Gambar 1.2 diatas menunjukan cashflow dari project SEAFE. Peningkatan

biaya mulai terlihat meningkat tajam di quarter 2 dikarenakan aktivitas-aktivitas yang

membutuhkan cost yang cukup besar terletak pada quarter 2.

4. COST CONTROL

Dalam membuat biaya suatu project, biaya diatas merupakan biaya yang

terjadi apabila tidak ada yang berubah dalam masing-masing aktivitas. Akan tetapi

dalam kenyataannya, project dapat mempunyai optimistic dan pesimistic cost yang

dalam kasus ini diberikan nilai + 25% dari nilai most likely cost untuk pesimistic cost

dan – 10% dari nilai most likely cost untuk optimistic cost.

Tabel 1.9. Perbandingan Cumulative cost, pesimistic cost, dan optimistic cost.

`

Quarter Cost Cumulative Cost Pesimistic Optimistic2016 Q1 Rp4.573.640.979,5 Rp4.573.640.979,5 Rp4.939.532.257,9 Rp4.207.749.701,12016 Q2 Rp6.955.044.262,5 Rp11.528.685.242,0 Rp12.450.980.061,4 Rp10.606.390.422,62016 Q3 Rp4.474.940.133,3 Rp16.003.625.375,3 Rp17.283.915.405,4 Rp14.723.335.345,32016 Q4 Rp4.715.992.333,3 Rp20.719.617.708,7 Rp22.377.187.125,4 Rp19.062.048.292,02017 Q1 Rp5.381.702.858,3 Rp26.101.320.567,0 Rp28.189.426.212,4 Rp24.013.214.921,62017 Q2 Rp28.611.900,0 Rp26.129.932.467,0 Rp28.220.327.064,4 Rp24.039.537.869,62017 Q3 Rp28.621.225,0 Rp26.158.553.692,0 Rp28.251.237.987,4 Rp24.065.869.396,62017 Q4 Rp28.639.875,0 Rp26.187.193.567,0 Rp28.282.169.052,4 Rp24.092.218.081,6

5E+09

1E+10

1,5E+10

2E+10

2,5E+10

3E+10

Cost

Gambar 1.3 Cash Flow Optimistic, Most Likely and Pesimistic Budget

Setelah diketahui baseline cost tiap minggu dari SEAFE Project maka

selanjutnya akan ditentukan optimistic cost dan pesimistic cost. Pada optimistic cost

ditentukan bahwa cost yang akan digunakan sebesar 90 % dari baseline cost.

Optimistic cost ini menandakan bahwa cost minimal yang dibutuhkan untuk

menjalankan SEAFE Project. Sedangkan pada pesimistic cost, cost akan dilebihkan

25% dari baseline cost yang ada. Pesimistic cost ini merupakan budget biaya

maksimal yang dibutuhkan SEAFE Project. Pesimistic cost mempunyai range yang

lebih besar daripada optimistic cost dikarenakan dalam menjalankan proyek, biaya

yang dibutuhkan lebih sering membengkak dibandingkan adanya saving dalam suatu

`

proyek. Oleh karena itu, range untuk pesimistic cost akan lebih besar dibandingkan

range optimistic cost. Setelah didapatkannya baseline cost, pesimistic cost dan

optimistic cost maka biaya ini yang akan dijadikan patokan dalam cost control saat

menjalankan SEAFE Project

REFERENSI

`

Alibaba. 2013. Marine Boat. URL: http://www.alibaba.com/showroom/lifeboat-prices.html

[Diakses online pada 18 Mei 2015]

Angel Fire. 2014. Snipper Riffle. URL: http://www.angelfire.com/nc2/kensar/Sniper.htm

[Diakses Online pada 18 Mei 2015]

Bhinekka., 2014., Daftar Harga Tinta Printer Epson. URL:

http://www.bhinneka.com/category/tinta_printer_epson.aspx [ Diakses online

pada 18 Mei 2015]

Enter Komputer. 2015. Projector. URL: http://enterkomputer.com/projector.php [Diakses Online 20 Mei 2015]

Enter Komputer. 2015. LCD. URL: http://enterkomputer.com/lcd.php [Diakses Online 20 Mei 2015]

Enter Komputer. 2015. Notebook. URL: http://enterkomputer.com/notebook.php [Diakses Online 20 Mei 2015]

Gajimu. 2014. Sukses Dalam Manajemen Sumber Daya Manusia. URL:

http://www.gajimu.com/main/gaji/kisaran-gaji/personalia-sdm [Diakses Online

pada 18 Mei 2015]

Happy Party. 2015., Taburan/Confetti. URL: http://www.happyparty.us/product.php?

category=59 [Diakses Online pada 18 Mei 2015]

Job Street. 2013. Staff Administrasi. URL: http://job-search.jobstreet.co.id/indonesia/job-opening.php?key=staf+administrasi [Diakses Online pada 17 Mei 2015]

Job Street. 2015. Procurement Team. URL: http://job-search.jobstreet.co.id/indonesia/job-opening.php?key=procurement+team [Diakses Online pada 17 Mei 2015]

Lowongan Trovit. 2014. Gaji Supervisor. URL: http://lowongan.trovit.co.id/1350/gaji-supervisor [Diakses Online pada 19 Mei 2015]

Military Factory. 2015. Navy Seals Weapon . URL: http://www.militaryfactory.com/smallarms/navy-seal-weapons.asp [Diakses Online pada 17 Mei 2015]

My Job Street. Salary Report. URL: http://myjobstreet.jobstreet.co.id/career-enhancer/basic-salary-report.php?param=Relationship%20Officer||97||id [Diakses Online pada 18 Mei 2015]

`

Prima Cipta. 2013. Sertifikat/Piagam. URL: http://percetakanjogja.net/sertifikat-piagam/ [

Diakses Online pada 17 Mei 2015]

Sentra Kantor., Papan Tulis ( Whiteboard). URL: http://www.sentrakantor.co.id/papan-tulis-

whiteboard [Diakses online pada 20 Mei 2015

Tokopedia. 2014. Spidol Whiteboard. URL: https://www.tokopedia.com/p/office-

stationery/alat-tulis/spidol-whiteboard [Diakses Online pada 20 Mei 2015]