BOQ PWS Simpang 3 Batu Redi, Kerenyanyan

2
K E G I A T A N LOKASI : KABUPATEN KUTAI TIMUR SUMBER DANA : APBD II TA : 2015 A BIAYA LANGSUNG PERSONIL - B BIAYA LANGSUNG NON PERSONIL - JUMLAH ( A+B+C+D+E+F) - PPN 10 % - JUMLAH BIAYA PEKERJAAN - DIBULATKAN - Terbilang : REKAPITULASI HARGA NO . URAIAN JUMLAH : PENGAWASAN TEKNIS DAN REVIEW DESIGN PEMELIHARAAN JALAN SIMPANG 3 BATU REDI - BATU REDI DAN PENINGKATAN JALAN KERENYANYAN Sangatta, 2015 PT/CV............................. .................................. Jabatan

description

hhhhh

Transcript of BOQ PWS Simpang 3 Batu Redi, Kerenyanyan

  • K E G I A T A N

    LOKASI : KABUPATEN KUTAI TIMUR

    SUMBER DANA : APBD II

    TA : 2015

    A BIAYA LANGSUNG PERSONIL -

    B BIAYA LANGSUNG NON PERSONIL -

    JUMLAH ( A+B+C+D+E+F) -

    PPN 10 % -

    JUMLAH BIAYA PEKERJAAN -

    DIBULATKAN -

    Terbilang :

    REKAPITULASI HARGA

    NO

    .URAIAN JUMLAH

    : PENGAWASAN TEKNIS DAN REVIEW DESIGN PEMELIHARAAN JALAN SIMPANG

    3 BATU REDI - BATU REDI DAN PENINGKATAN JALAN KERENYANYAN

    Sangatta, 2015

    PT/CV.............................

    ..................................Jabatan

  • KEGIATAN : PEMELIHARAAN JALAN

    PAKET :

    SUMBER DANA : APBD II KABUPATEN KUTAI TIMUR

    TAHUN ANGGARAN : 2015

    NO. KUANTITAS JANGKA

    WAKTU VOLUME SATUAN

    HARGA SATUAN

    ( Rp )

    JUMLAH HARGA

    (Rp)A. BIAYA LANGSUNG PERSONIL

    1 TENAGA AHLI

    - Site Engineer 1,00 6,00 6,00 OB - -

    -

    2 TENAGA TEKNISI

    - Inspector / Surveyor 2,00 6,00 12,00 OB - - - -

    - Material Teknisi 1,00 4,00 4,00 OB - - -

    -

    3 TENAGA PENUNJANG

    - Operator Komputer 1,00 6,00 6,00 OB - -

    -

    -

    KEGIATAN : PEMELIHARAAN JALAN

    PAKET :

    SUMBER DANA : APBD II KABUPATEN KUTAI TIMUR

    TAHUN ANGGARAN : 2015

    NO. KUANTITAS JANGKA

    WAKTU VOLUME SATUAN

    HARGA SATUAN

    ( Rp )

    JUMLAH HARGA

    ( Rp )B. BIAYA LANGSUNG NON PERSONIL

    -

    1 BIAYA KANTOR-

    - Biaya Komunikasi 2,00 6,00 12,00 BLN - - -

    - Eksploitasi / Material Kantor 1,00 1,00 1,00 LS - - -

    - Sewa Komputer 1,00 6,00 6,00 BLN - -

    -

    2 BIAYA PERUMAHAN DAN KENDARAAN

    - Sewa Rumah / Kantor 1,00 6,00 6,00 BLN - -

    - Sewa Kendaraan Roda 2 (dua) 2,00 6,00 12,00 BLN - -

    -

    4 LAPORAN - LAPORAN

    - Laporan Bulanan 3,00 6,00 18,00 EXP. - - - - -

    - Laporan Akhir 3,00 1,00 3,00 EXP. - -

    -

    -

    SUB TOTAL B.3

    SUB TOTAL B.4

    SUB TOTAL B.5

    TOTAL BIAYA LANGSUNG NON PERSONIL = (B.1)

    TOTAL BIAYA LANGSUNG PERSONIL = ( A.1 + A.2 + A.3)

    RINCIAN BIAYA LANGSUNG NON PERSONIL

    PENGAWASAN TEKNIS DAN REVIEW DESIGN PEMELIHARAAN JALAN SIMPANG 3

    BATU REDI - BATU REDI DAN PENINGKATAN JALAN KERENYANYAN

    URAIAN KEGIATAN

    SUB TOTAL B.1

    Sub Total A.3

    RINCIAN BIAYA LANGSUNG PERSONIL

    PENGAWASAN TEKNIS DAN REVIEW DESIGN PEMELIHARAAN JALAN SIMPANG 3

    BATU REDI - BATU REDI DAN PENINGKATAN JALAN KERENYANYAN

    URAIAN KEGIATAN

    Sub Total A.1

    Sub Total A.2