K E G I A T A N
LOKASI : KABUPATEN KUTAI TIMUR
SUMBER DANA : APBD II
TA : 2015
A BIAYA LANGSUNG PERSONIL -
B BIAYA LANGSUNG NON PERSONIL -
JUMLAH ( A+B+C+D+E+F) -
PPN 10 % -
JUMLAH BIAYA PEKERJAAN -
DIBULATKAN -
Terbilang :
REKAPITULASI HARGA
NO
.URAIAN JUMLAH
: PENGAWASAN TEKNIS DAN REVIEW DESIGN PEMELIHARAAN JALAN SIMPANG
3 BATU REDI - BATU REDI DAN PENINGKATAN JALAN KERENYANYAN
Sangatta, 2015
PT/CV.............................
..................................Jabatan
KEGIATAN : PEMELIHARAAN JALAN
PAKET :
SUMBER DANA : APBD II KABUPATEN KUTAI TIMUR
TAHUN ANGGARAN : 2015
NO. KUANTITAS JANGKA
WAKTU VOLUME SATUAN
HARGA SATUAN
( Rp )
JUMLAH HARGA
(Rp)A. BIAYA LANGSUNG PERSONIL
1 TENAGA AHLI
- Site Engineer 1,00 6,00 6,00 OB - -
-
2 TENAGA TEKNISI
- Inspector / Surveyor 2,00 6,00 12,00 OB - - - -
- Material Teknisi 1,00 4,00 4,00 OB - - -
-
3 TENAGA PENUNJANG
- Operator Komputer 1,00 6,00 6,00 OB - -
-
-
KEGIATAN : PEMELIHARAAN JALAN
PAKET :
SUMBER DANA : APBD II KABUPATEN KUTAI TIMUR
TAHUN ANGGARAN : 2015
NO. KUANTITAS JANGKA
WAKTU VOLUME SATUAN
HARGA SATUAN
( Rp )
JUMLAH HARGA
( Rp )B. BIAYA LANGSUNG NON PERSONIL
-
1 BIAYA KANTOR-
- Biaya Komunikasi 2,00 6,00 12,00 BLN - - -
- Eksploitasi / Material Kantor 1,00 1,00 1,00 LS - - -
- Sewa Komputer 1,00 6,00 6,00 BLN - -
-
2 BIAYA PERUMAHAN DAN KENDARAAN
- Sewa Rumah / Kantor 1,00 6,00 6,00 BLN - -
- Sewa Kendaraan Roda 2 (dua) 2,00 6,00 12,00 BLN - -
-
4 LAPORAN - LAPORAN
- Laporan Bulanan 3,00 6,00 18,00 EXP. - - - - -
- Laporan Akhir 3,00 1,00 3,00 EXP. - -
-
-
SUB TOTAL B.3
SUB TOTAL B.4
SUB TOTAL B.5
TOTAL BIAYA LANGSUNG NON PERSONIL = (B.1)
TOTAL BIAYA LANGSUNG PERSONIL = ( A.1 + A.2 + A.3)
RINCIAN BIAYA LANGSUNG NON PERSONIL
PENGAWASAN TEKNIS DAN REVIEW DESIGN PEMELIHARAAN JALAN SIMPANG 3
BATU REDI - BATU REDI DAN PENINGKATAN JALAN KERENYANYAN
URAIAN KEGIATAN
SUB TOTAL B.1
Sub Total A.3
RINCIAN BIAYA LANGSUNG PERSONIL
PENGAWASAN TEKNIS DAN REVIEW DESIGN PEMELIHARAAN JALAN SIMPANG 3
BATU REDI - BATU REDI DAN PENINGKATAN JALAN KERENYANYAN
URAIAN KEGIATAN
Sub Total A.1
Sub Total A.2