  • SUHU YANG SANGAT TINGGI PADA BOILER (KETEL UAP) LEBIH DARI 15000F ATAU 8000C

    DAPAT MENYEBABKAN TERBENTUKNYA BRITTLE IRON OXSIDE ATAU DISEBUT

    MAGNETIT DIDALAM DAN DILUAR PERMUKAAN DRUM PLATE.

    PADA SUHU YANG TINGGI, UAP AIR AKAN BEREAKSI DENGAN BESI BAJA UNTUK

    MEMBENTUK MAGNETIT DAN HYDROGEN.

    KECEPATAN REAKSI INI MENINGKAT SEIRINGAN DENGAN SUHU YANG MENINGKATSEHINGGA MENYEBABKAN ATOM OKSIGEN AKAN BERDIFUSI KE DALAM MELALUILAPISAN MAGNETIT , DAN ATOM BESI AKAN MENYEBAR KE LUAR , SEHINGGASCALE/KERAK TERUS TUMBUH BAHKAN SETELAH PERMUKAAN TABUNG BENAR-BENARTERTUTUP OLEH SCALE. DINDING TABUNG YANG TERTUTUP SCALE AKAN PANASHINGGA SUHU DI LUAR JANGKAUAN OPERASI YANG DIINGINKAN. AKIBAT KONTAKJANGKA PANJANG DENGAN SUHU YANG TERLALU TINGGI DAN DIKOMBINASIKANDENGAN TEKANAN YANG SANGAT TINGGI DI DALAM TABUNG, AKAN MENYEBABKANINTERGRANULAR MIKRO ATAU RETAK PADA LOGAM DAN CREEP DEFORMASI (PEMBENGKAKAN LAMBAT ATAU MENGGEMBUNG LOGAM ) DIMANA MELEBIHI YIELDSTRENGTH MATERIAL, YANG PADA AKHIRNYA MENYEBABKAN KEGAGALAN TABUNGDENGAN MENYEBABKAN MELEDAK .

    MASALAH SEKUNDER ADALAH, DI MANA POTONGAN OKSIDA SCALE BREAK ( BIASANYAKARENA TEGANGAN TEROKSIDA OXFOLIATIONMAL SELAMA BOILER STARTUP ATAUSHUTDOWN) YANG MASUK KE TURBIN DAN MENYEBABKAN KOROSI PADA TURBIN

    UNTUK ITU BOILER HARUS DILAKUKAN INSPECTION

    KENAPA BOILER HARUS DI INSPECTION SECARA

    BERKALA??????????

  • DAFTAR ISI

    1. TUJUAN BOILER LIFE ASSESSMENT

    2. EVALUASI SELAMA OPERASI DENGAN INSPECTION

    3. PERSIAPAN UNTUK INSPECTION

    4. DATA REQUIREMENT

    5. INSPECTION PADA HIGH PRESSURE PARTS.

    6. SAMPLE TUBE INSPECTION *)

    7. VISUAL INSPECTION PADA PART-PART BOILER .

    8. SURVEY KUALITAS AIR

    9. VISUAL INSPECTION UNTUK AUX EQUIPMENT

    10. HIGH PRESSURE PARTS INSPECTION DETAILS

  • 1. Mengevaluasi keadaan sekarang dan kondisi komponen boiler dalam rangka Untuk

    melanjutkan operasi boiler stabil dan handal

    2. Evaluasi sisa umur untuk Superheater dan alat pemanas dengan pemeriksaan UT

    scale thickness

    3. Evaluasi creep dan skema inspeksi masa depan dengan pemeriksaan metalurgi

    untuk water wall, economizer, Superheater dan Reheater tube

    4. Evaluasi tingkat kerusakan creep Superheater dan reheater dengan uji kekerasan

    (Hardness Test)

    5. Evaluasi sisa umur berdasarkan Pengukuran ketebalan untuk water wall,

    6. Evaluasi sisa umur berdasarkan penipisan ketebalan untuk economizer karena

    Korosi Suhu rendah,

    7. Evaluasi sisa umur berdasarkan penipisan ketebalan untuk Superheater dan

    reheater tube karena Korosi Suhu tinggi

    8. Konfirmasi penyebab inner scale generation

    9. Evaluasi sisa umur berdasarkan cek struktur logam ,inner scale , dll untuk tabung

    sample (Destructive test)

    1- TUJUAN DARI BOILER LIFE ASSESSMENT

  • 2. EVALUASI SELAMA OPERASI DENGANINSPECTION

    FAILURE PENYEBAB KEGAGALAN

    FENOMENA LIFE EVALUATION INSPECTION ITEM

    CREEP Penyumbatanoleh material asing

    Penambahan danpertumbuhan dariscale pada inner surface

    Long-term stress

    Swelling (Deformasimengelembung)

    Perubahanstruktur Metal

    Outside diameter danpengukuran thickness

    Metallurgical inspection *)

    Metallurgical inspection for SH, RH header, *)

    Metallurgical inspection *) dan NDT (UT) untuk main steam pipe line danhigh temperature RH pipe

    FATIGUE (Kelelahan)

    siklus thermal stress

    Pertumbuhancrack

    Stress analysis

    Surface crack inspection (PT,MT)

    NDE (PT) pada area welding untukSuperHeater dan ReHeater Tube

    CORROSION FATIGUE

    siklus thermal stress disebabkankorosi lingkungan

    interaksicorrosion danfatigue

    Ultrasonic test

    Sample tube inspection *)

    Sample tube inspection pada SH, RH dan water wall *)

    Check Burner Nozzle dan Wind Box Damper

    CORROSION

    EROSION

    High temp corrosion

    Low temp corrosion

    Ash erosion

    Penipisanketebalan

    Pengukuran thickness tahunan

    Pengukuran tube thickness pada SH ,RH, Water Wall and Eco dengan UT

    Steam drum

    Boiler aux

    Eco Hanger tube dengan borescope, etc

  • 3-PERSIAPAN UNTUK INSPECTION BEFORE INSPECTION

    PEMBERSIHAN SUPERHEATER, REHEATER, ECONOMIZER DAN WATER WALL

    AIR HEATER WASHING

    SCAFFOLDING

    REMOVAL OF INSULATION

    OPEN MAN HOLES, INSPECTION HOLES, FLANGES DLL

    DURING INSPECTION SURFACE PREPARATION OF INSPECTION PARTS

    SURFACE FINISHING (GRINDING) OF INSPECTION PARTS

    PERALATAN INSPECTION

    CUTTING TUBES *)

    WELDING TUBES *)

    MATERIAL REQUIREMENT NEW TUBES *)

    MAN HOLE PACKING

    INSULATION

    PERIOD OF INSPECTION

    ONE WEEKS

  • 4- DATA REQUIREMENT

    BOILER REFERENCE DATA STEAM TEMPERATURE 0C

    MAXIMUM STEAM FLOW TON/HR BOILER DESIGN PRESSURE KGM/CM2

    FEED WATER TEMP 0C

    REHEATED INLET STEAM TEMPERATURE 0C REHEATED OUTLET STEAM TEMPERATURE 0C

    REHEATER DESIGN PRESSURE KGM/CM2

    KIND OF FUEL (BAHAN BAKAR) GAS, OIL, SAWIT

    FUNCTIONAL INSPECTION WITH BOILER IN OPERATION MENGUMPULKAN DRAWINGS DAN TECHNICAL DATA

    RECORDING DARI ACTUAL OPERASI DAN DATA PERBEDAANLOADS DAN KONDISI PADA LOG SHEET BOILER DAN VERIFIKASIDARI DATA BOILER SAAT OPERASI

    MENGUMPULKAN DATA THERMAL HISTORY PADA SAAT OPERASI

  • PERALATAN YANG DIPUNYA INDOMARINE

    1. UT THICKNESS

    2. PORTABLE HARDNESS TEST

    3. BORESCOPE

    4. LAPTOP UNTUK PENGOPERASIAN BORESCOPE

    5. UT SCALE THICKNESS ATAU BISA MENGGUNAKAN UT PHASED ARRAY

    6. PORTABLE SCANER (JIKA BUKAN BOILER IM UNTUK SCAN DRAWING)

    PERALATAN YANG DIBUTUHKAN

  • 5-INSPECTION PADA HIGH PRESSURE PARTS

    NON DESTRUCTIVE TEST MENGIKUTI ITEM SEBAGAIBERIKUT:

    1. ECONOMIZER HEADERS, COILS, PIPING FROM ECONOMIZER TO STEAM DRUM,.2. STEAM DRUM.3. FURNACE WATER WALLS, (SCREEN TUBE/REAR WALL SISI LUAR ATAS, ROOF WALL,

    FRONT WALL, SIDE WALL L & R, BANK TUBE, UPPER CONNECTION PIPE/RISER ,WATER WALLS HEADERS.

    4. SATURATION STEAM PIPE.5. PRIMARY, SECONDARY SUPER HEATER (IF ANY)6. CONNECTING PIPE BETWEEN PRIMARY SUPERHEATER AND SECONDARY

    SUPERHEATER. (IF ANY)7. REHEATER / AIR PREHEATER.8. MAIN SUPERHEATER STEAM PIPES

    **INSPECTION 7 ITEM

    1. EXTERNAL VISUAL INSPECTION2. INTERNAL VISUAL INSPECTION WITH BORESCOPE3. UT FOR THICKNESS MEASUREMENTS BY UT 4. PT AND UT ON CIRCUMFERENTIAL WELDS (R)5. PT ON PIPING ATTACHMENTS (R)6. PT ON NOZZLES WELDS OF THE COIL TUBES (R)7. PT ON NOZZLES WELDS TO THE SHELL OF THE

    INLET/OUTLET PIPE

  • THE MINIMUM REQUIRED THICKNESS

    t = minimum required thickness.

    D = outside diameter of cylinder.

    e = thickness factor for expanded tube ends.

    P = maximum allowable working pressure.

    S = maximum allowable stress value at the design temperature of the metal.

  • DESIGN / OPERATING INFORMATIONUNTUK PERHITUNGAN WAKTU YANG TERSISA BERDASARKAN THICKNESS

    DESIGN INFORMATION MATERIAL TYPE / GRADE NOMINAL OUTSIDE DIAMETER DESIGN PRESSURE DESIGN THICKNESS DESIGN TEMPERATURE ORIGINAL NOMINAL

    THICKNESS LAMA BOILER BEROPERASI

    OPERATING INFORMATION MAXIMUM DESIGN METAL

    TEMPERATURE TUBE NORMAL OPERATING

    PRESSURE ORIGINAL MEASURED

    MINIMUM THICKNESS RATA-RATA THICKNESS

    METAL

    Thickness

    measurements

    of water wall

    tubes furnace

  • PERHITUNGAN BOILER LIFE ASSESSMENT

    MENCARI LAJU KOROSI

    = ( )

    PENENTUAN BOILER LIFE ASSESSMENT

    =( )MIN

    DENGAN SYARAT KUALITAS AIR, CARA MENGOPERASIKAN

    BOILER SAMA SELAMA BEROPERASI SELAMA INI.

  • 6-SAMPLE TUBE - *)

    DESTRUCTIVE TEST PADA SAMPLE TUBE DI AREA WATER WALL ,SUPERHEATER DAN REHEATER TUBES

    DIAGNOSA SELAMA OPERASI BERDASARKAN CHECK STRUCTURE METAL, THICKNESS, INNER SCALE, DLL *)

    SAMPLE TUBE YANG DIAMBIL SESUAI DENGAN HASIL PENGUKURAN HARDNESS TEST

    INVESTIGATION ITEMS VISUAL INSPECTION NON DESTRUCTIVE TEST CHEMICAL ANALYSIS *) MEASUREMENT OF THE TUBE DIMENSION HARDNESS MEASUREMENT

    CROSS SECTIONAL MICROSTRUCTURE OBSERVATION *) STEAM OXIDATION OBSERVATION CREEP RUPTURE TEST *) PENGUKURAN THICKNESS PADA INNER SCALE

    INFORMATION MATERIAL SAMPLE TUBE TUBE DIMENSION

  • SAMPLE TUBES UNTUK MICRO TEST

    THINNING OF BULGED ZONE INTERNAL SURFACE SCALE EXTERNAL SURFACE SCALE

  • 7-VISUAL INSPECTION UNTUK PART-PART DARI BOILER

    BURNER

    WIND BOX

    HANGER FOR RISER PIPE

    OUTER CASING

    BUCKSTAY

  • 8- SURVEY KUALITAS AIR

    INSPECTION INI UNTUK MENGKONFIRMASI

    PENYEBAB DARI SCALE/KERAK

    INSPECTION ITEMS

    CHECK OF LABORATORY ANALYSIS METHOD FOR

    QUALITY ITEMS

    KONFIRMASI HASIL KUALITAS AIR SEBELUM

    DIOPERASIKAN

    CHECK INSTRUMENT CONDITION ON SAMPLING RACK

    USED FOR WATER QUALITY CONTROL

    CONFIRMATION OF PH VALUE AND IRON/COPPER

    BALANCE IN THE CYCLE

  • 9-VISUAL INSPECTION PADA AUX EQUIPMENT

    INSPECTION INI UNTUK MENGETAHUI PENYEBAB SCALE

    GENERATION

    CONDENSER HOT WELL. CONDENSER TUBE SIDE DEAERATOR. LOW PRESSURE-FEED

    WATER HEATER. FEED WATER TANK. HIGH PRESSURE-FEED

    WATER HEATER.

  • 10-HIGH PRESSURE PARTS INSPECTION DETAILS

    1. ECONOMIZER HEADERS ,COILS, PIPING FROM ECONOMIZER TO

    STEAM DRUM ,

    2. STEAM DRUM

    3. FURNACE WATER WALLS, (SCREEN TUBE/REAR WALL, ROOF WALL

    SISI LUAR ATAS, FRONT WALL, SIDE WALL L & R, BANK TUBE, UPPER

    CONNECTION PIPE/RISER ,WATER WALLS HEADERS)

    4. SATURATION STEAM PIPE

    5. PRIMARY, SECONDARY SUPERHEATER

    6. CONNECTING PIPE ANTARA PRIMARY SUPER HEATER DAN

    SECONDARY SUPERHEATER

    7. REHEATER/ AIR PREHEATER

    8. MAIN SUPERHEATER STEAM PIPES

  • 10-1 ECONOMIZER

    NDE FOR HEADERS EXTERNAL VISUAL INSPECTION INTERNAL VISUAL INSPECTION WITH BORESCOPE MEASUREMENT OF THICKNESS BY UT PT ON NOZZLES WELDS OF THE COIL TUBES AND HEADERS

    ATTACHMENTS PT AND UT ON CIRCUMFERENTIAL WELDS BETWEEN HEADER AND

    CONICAL PIECES

    NDE FOR TUBE EXTERNAL VISUAL INSPECTION MEASUREMENT OF ECONOMIZER TUBE AND HANGER TUBE THICKNESS

    WITH BORESCOPE UT FOR THICKNESS MEASUREMENTS

    NDE FOR PIPING FROM ECONOMIZER TO STEAM DRUM EXTERNAL VISUAL INSPECTION FOR PIPING, HANGERS AND SUPPORTS UT FOR THICKNESS MEASUREMENTS PT AND UT ON CIRCUMFERENTIAL WELDS (RANDOM) PT ON PIPING ATTACHMENTS PT ON THE ELBOWS

  • 10-2 STEAM DRUM

    BEFORE THE NDT INSPECTIONS, THE INTERNAL PARTS OF THE DRUM SHALL BE DISMANTLED

    NDE FOR STEAM DRUM EXTERNAL VISUAL INSPECTION INTERNAL VISUAL INSPECTION UT FOR SHELL THICKNESS MEASUREMENTS UT FOR HEAD THICKNESS MEASUREMENTS PT AND UT ON CIRCUMFERENTIAL AND LONGITUDINAL

    WELDS (R) PT ON STEAM DRUM ATTACHMENTS (SADDLES AND

    ACCESSORIES) PT ON NOZZLES WELDS

    NDE FOR DOWNCOMERS & FEEDERS (FEED WATER PIPE)

    EXTERNAL VISUAL INSPECTION FOR PIPING, HANGERS AND SUPPORTS

    UT FOR THICKNESS MEASUREMENTS PT AND UT ON CIRCUMFERENTIAL WELDS PT ON PIPING ATTACHMENTS

  • 10-3 FURNACE WATER WALLS, (SCREEN TUBE/REAR WALL, ROOF WALL SISI LUAR ATAS, FRONT WALL, SIDE WALL L & R, BANK TUBE, UPPER CONNECTION PIPE/RISER ,WATER WALLS

    HEADERS

    NDE FOR FURNACE WATER WALLS, SCREEN, ROOF WALL EXTERNAL VISUAL INSPECTION

    UT FOR THICKNESS MEASUREMENTS METALLOGRAPHIC EXAMINATION BY PLASTIC REPLICAS *)

    SAMPLES FOR DESTRUCTIVE TEST *)

    NDE FOR RISER EXTERNAL VISUAL INSPECTION

    UT FOR THICKNESS MEASUREMENTS

    NDE FOR HEADERS EXTERNAL VISUAL INSPECTION

    INTERNAL VISUAL INSPECTION WITH BORESCOPE

    UT UNTUK THICKNESS MEASUREMENTS PT PADA NOZZLES WELDS DARI COIL TUBES

    PT PADA CABANG (T) WELDS DAN HEADERS ATTACHMENTS, TERMASUK DRAINS TUBES

  • 10-4 SATURATION STEAM PIPE

    NDE FOR EACH PIPE

    EXTERNAL VISUAL INSPECTION

    UT FOR THICKNESS MEASUREMENTS

    PT AND UT ON CIRCUMFERENTIAL WELDS (R)

    PT ON PIPING ATTACHMENTS

    PT ON THE ELBOWS EXTRADOS

  • 10-5 PRIMARY,SECONDARY SUPERHEATER

    NDE FOR THE HEADERS (TYPE PENDAND : 1 PCS ; TYPE U ON TOP : 2PCS) EXTERNAL VISUAL INSPECTION INTERNAL VISUAL INSPECTION WITH BORESCOPE UT FOR THICKNESS MEASUREMENTS UT FOR HEADER THICKNESS MEASUREMENTS PT ON NOZZLES WELDS OF THE COIL TUBES (R) PT ON NOZZLES WELDS TO THE SHELL OF THE INLET/OUTLET

    PIPE PT AND UT ON CIRCUMFERENTIAL WELDS BETWEEN HEADER

    AND HEADS/ PIPING PT ON HEADERS ATTACHMENTS METALLOGRAPHIC EXAMINATION BY PLASTIC REPLICAS *)

    NDE FOR COILS EXTERNAL VISUAL INSPECTION UT FOR THICKNESS MEASUREMENTS INTERNAL VISUAL INSPECTION WITH BORESCOPE HARDNESS MEASUREMENTS SAMPLES FOR DESTRUCTIVE EXAMINATIONS *)

  • 10-6 CONNECTING PIPE ANTARA PRIMARY DAN SECONDARY SUPERHEATER,

    DESUPERHEATER NDE FOR CONNECTING PIPE

    EXTERNAL VISUAL INSPECTION UT FOR THICKNESS MEASUREMENTS PT AND UT ON CIRCUMFERENTIAL WELDS (R) PT ON PIPING ATTACHMENTS PT ON THE ELBOWS EXTRADOS METALLOGRAPHIC EXAMINATION BY PLASTIC REPLICAS

    *)

    NDE FOR DESUPERHEATER EXTERNAL VISUAL INSPECTION INTERNAL VISUAL INSPECTION WITH BORESCOPE UT FOR THICKNESS MEASUREMENTS PT ON CIRCUMFERENTIAL WELDS (R) METALLOGRAPHIC EXAMINATION BY PLASTIC REPLICAS

    *)

  • 10-7 REHEATER / AIR PREHEATER

    NDE FOR EACH ONE OF THE HEADERS

    EXTERNAL VISUAL INSPECTION INTERNAL VISUAL INSPECTION WITH BORESCOPE UT FOR THICKNESS MEASUREMENTS PT ON NOZZLES WELDS OF TUBES PT ON NOZZLES WELDS TO THE SHELL OF THE

    INLET/OUTLET PIPE PT AND UT ON CIRCUMFERENTIAL WELDS (R) PT ON HEADERS ATTACHMENTS (R) METALLOGRAPHIC EXAMINATION BY PLASTIC REPLICAS *)

    NDE FOR COILS

    EXTERNAL VISUAL INSPECTION UT FOR THICKNESS MEASUREMENTS INTERNAL VISUAL INSPECTION WITH BORESCOPE HARDNESS MEASUREMENTS SAMPLES FOR DESTRUCTIVE EXAMINATIONS *)

  • 10-8 MAIN SUPERHEATER STEAM PIPES

    NDE FOR EACH PIPE

    EXTERNAL VISUAL INSPECTION

    UT FOR THICKNESS MEASUREMENTS

    PT AND UT ON CIRCUMFERENTIAL WELDS (R)

    PT ON PIPING ATTACHMENTS (R)

    PT ON THE ELBOWS EXTRADOS

    PT ON NOZZLES WELDS TO THE PIPE

    METALLOGRAPHIC EXAMINATION BY PLASTIC REPLICAS *)