PEMERINTAH KABUPATEN ACEH UTARA DINAS SUMBER DAYA AIR Jln. Tgk. Chik Ditiro No 19 - Telp (0645) 43763 Fax (0645) 43994 LHOKSEUMAWE - 24312 PERHITUNGAN VOLUME - PEKERJAAN TANAH - PEKERJAAN BETON PERBAIKAN DAN PEMBANGUNAN JARINGAN IRIGASI DAN PENANGGULANGAN BANJIR SALURAN SEKUNDER BS.3 – BS.4 KECAMATAN PAYA BAKONG – KABUPATEN ACEH UTARA TAHUN ANGGARAN 2007 Konsultan Perencana CV. TOTAL ENGINEERING CONSULTANT Jln. Kenari No. 9B – Telp./Fax. 0645 – 41538 LHOKSEUMAWE - 24312

description

cvg

Transcript of Back Up Volume

Page 1: Back Up Volume

PEMERINTAH KABUPATEN ACEH UTARA DINAS SUMBER DAYA AIR Jln. Tgk. Chik Ditiro No 19 - Telp (0645) 43763 Fax (0645) 43994 LHOKSEUMAWE - 24312

PERHITUNGAN VOLUME - PEKERJAAN TANAH - PEKERJAAN BETON

PERBAIKAN DAN PEMBANGUNAN

JARINGAN IRIGASI DAN PENANGGULANGAN BANJIR

SALURAN SEKUNDER BS.3 – BS.4 KECAMATAN PAYA BAKONG – KABUPATEN ACEH UTARA TAHUN ANGGARAN 2007 Konsultan Perencana CV. TOTAL ENGINEERING CONSULTANT Jln. Kenari No. 9B – Telp./Fax. 0645 – 41538 LHOKSEUMAWE - 24312

Page 2: Back Up Volume

PERBAIKAN DAN PEMBANGUNAN

JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR

SALURAN SEKUNDER BS.3 – BS.4 KECAMATAN PAYA BAKONG – KABUPATEN ACEH UTARA

PERHITUNGAN VOLUME PEKERJAAN TANAH

TAHUN ANGGARAN 2007

Konsultan Perencana CV. TOTAL ENGINEERING CONSULTANT

Jln. Kenari No. 9B – Telp./Fax. 0645 – 41538 LHOKSEUMAWE - 24312

Page 3: Back Up Volume

PERBAIKAN DAN PEMBANGUNAN JARINGAN IRIGASI DAN PENANGGULANGAN BANJIRSALURAN SEKUNDER RUAS BS.3 - BS.4 - D.I. ALUE UBAYKECAMATAN PAYA BAKONG - KABUPATEN ACEH UTARA

Profi Langsung Galian Timbunan Galian Timbunan

A.0 / BS.350.0

A.1 50.0 3.00 0.69 74.98 17.3350.0

A.2 100.0 0.75 0.00 93.84 17.3350.0

A.3 150.0 3.04 3.52 94.86 87.9950.0

A.4 200.0 2.10 0.00 128.49 87.9950.0

A.5 250.0 2.29 0.35 109.76 8.7350.0

A.6 300.0 1.70 0.09 99.82 10.9250.0

A.7 350.0 0.83 0.00 63.19 2.2050.0

A.8 400.0 1.41 0.00 55.93 0.0050.0

A.9 450.0 0.91 0.01 57.98 0.1850.0

A.10 500.0 0.94 0.00 46.08 0.1850.0

A.11 550.0 0.54 0.28 36.93 6.9050.0

A.12 600.0 0.39 0.25 23.41 13.1550.0

A.13 650.0 3.07 3.25 86.68 87.3747.0

A.14 697.0 72.20 76.2643.4

A.15 740.4 - - - - 67.6

A.16 808.0 - - - - 44.0

A.17 852.0 - - - - 50.0

A.18 902.0 - - - - 46.0

A.19 / BS.4 948.0 - - - -

JUMLAH 948.0 1,044.14 416.55

PERHITUNGAN VOLUME PEKERJAAN TANAH

Volume (M3)AREA (m2)Bangunan Air / Pot Saluran

Jarak

Page 4: Back Up Volume

Perhitungan Volume Pekerjaan Tanah

Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.1 0 9.398 0.00 4.79 0.00 7.91 0.00 9.33 3.00 0.690.51 9.527 4.80 18.20 1.18 9.09 9.62 8.001.91 9.412 15.60 25.51 0.88 8.16 6.33 0.002.71 8.166 21.27 31.93 0.00 7.19 0.00 0.003.91 7.850 30.93 32.424.13 7.911 31.09 29.673.75 7.528 27.48 28.233.75 7.328 27.48 26.453.61 7.328 26.91 26.453.61 7.453 26.91 14.982.01 7.453 15.13 13.942.01 7.328 14.73 13.701.87 7.328 14.08 13.701.87 7.528 17.57 0.00- 9.398 0.00 0.00

273.98 279.97 15.95 17.34 3.00 0.69

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.2 0 8.517 0.00 7.15 0.750.84 7.900 6.40 15.331.94 7.621 15.15 23.933.14 7.810 28.59 34.684.44 9.104 40.32 40.424.44 9.080 33.38 26.062.87 7.517 21.00 21.572.87 7.317 21.00 20.052.74 7.317 20.39 20.052.74 7.442 20.39 8.291.11 7.442 8.15 8.481.14 7.317 8.34 7.321.00 7.317 7.52 7.321.00 7.517 8.52 0.00- 8.517 0.00 0.00

239.14 240.65 0.75 0.00

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.3 0 9.664 0.00 6.96 0.00 7.837 0.00 8.23 3.04 3.520.72 9.703 6.93 14.75 1.05 8.886 1.98 6.661.52 9.627 11.99 25.22 0.75 1.882 5.88 0.002.62 7.886 20.43 29.34 0.00 7.837 0.00 0.003.72 7.799 29.15 34.004.36 7.837 32.73 31.584.03 7.506 29.44 30.254.03 7.306 29.44 28.423.89 7.306 28.91 28.423.89 7.431 28.91 17.022.29 7.431 16.73 17.022.29 7.306 16.73 15.852.17 7.306 16.29 15.712.15 7.506 20.78 0.00- 9.664 0.00 0.00

288.46 294.54 7.85 14.89 3.04 3.52

CROSSKOORDINAT GALIAN

AREA (m2)

Jumlah

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN AREA (m2)

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN

Jumlah

AREA (m2)

Jumlah

KOORDINAT TIMBUNAN

Page 5: Back Up Volume

Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.4 0 9.44 0.00 5.57 2.100.59 9.346 5.30 9.911.06 8.986 8.30 16.981.89 7.831 14.30 22.632.89 7.567 23.16 30.954.09 8.015 36.74 35.194.39 8.982 39.68 48.235.37 9.038 40.23 34.533.82 7.492 27.86 28.623.82 7.292 27.86 26.913.69 7.292 27.37 26.913.69 7.417 27.37 15.432.08 7.417 15.17 15.432.08 7.292 15.17 14.221.95 7.292 14.61 14.221.95 7.492 18.41 0.00- 9.440 0.00 0.00

341.51 345.71 2.10 0.00

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.5 0 9.464 0.00 17.98 0.00 7.779 0.00 8.48 2.29 0.351.90 8.653 15.18 20.77 1.09 8.868 8.40 5.052.40 7.991 18.67 33.00 0.57 7.708 4.43 0.004.13 7.779 30.91 29.79 0.00 7.779 0.00 0.003.83 7.485 27.90 28.673.83 7.285 27.90 26.953.70 7.285 27.42 26.953.70 7.410 27.42 15.562.10 7.410 15.30 15.562.10 7.285 15.30 14.281.96 7.285 14.67 14.281.96 7.485 18.55 0.00- 9.464 0.00 0.00

239.22 243.80 12.84 13.53 2.29 0.35

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.6 0 9.136 0.00 7.67 0.00 7.989 0.00 7.75 1.70 0.090.84 8.844 7.34 16.27 0.97 8.957 7.95 3.491.84 8.734 13.95 17.82 0.39 8.197 3.12 0.002.04 7.579 15.29 23.80 0.00 7.989 0.00 0.003.14 7.494 25.09 30.354.05 7.989 30.27 28.283.54 7.474 25.75 26.463.54 7.274 25.75 24.733.40 7.274 25.16 24.733.40 7.399 25.16 13.321.80 7.399 13.09 13.321.80 7.274 13.09 12.071.66 7.274 12.41 12.071.66 7.474 15.17 0.00- 9.136 0.00 0.00

247.50 250.90 11.07 11.24 1.70 0.09

(lanjutan)

Jumlah

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN AREA (m2)

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN AREA (m2)

CROSSKOORDINAT GALIAN

Jumlah

KOORDINAT TIMBUNAN AREA (m2)

Jumlah

Page 6: Back Up Volume

Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.7 0 9.179 0.00 0.92 - - 0.83 0.000.10 9.139 0.75 15.81 - - 1.73 7.453 12.87 17.89 - - 2.40 7.437 18.33 27.52 - - 3.70 7.636 31.92 29.78 - - 3.90 8.627 34.16 40.55 - - 4.70 8.759 41.13 42.74 - - 4.88 8.751 36.42 31.42 - - 3.59 7.464 26.08 26.80 - - 3.59 7.264 26.08 25.06 - - 3.45 7.264 25.49 25.06 - - 3.45 7.389 25.49 13.67 - - 1.85 7.389 13.44 13.67 - - 1.85 7.264 13.44 12.49 - - 1.72 7.264 12.84 12.49 - - 1.72 7.464 15.79 0.00- 9.179 0.00 0.00

334.21 335.86 0.00 0.00 0.83 0.00

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.8 0 8.753 0.00 4.73 - - 1.41 0.000.54 8.485 4.10 10.52 - - 1.24 7.597 9.39 17.02 - - 2.24 7.572 17.19 23.78 - - 3.14 7.675 27.40 27.94 - - 3.64 8.727 32.89 38.75 - - 4.44 9.037 39.85 42.47 - - 4.70 8.975 35.03 28.45 - - 3.17 7.453 22.99 23.63 - - 3.17 7.253 22.99 22.05 - - 3.04 7.253 22.43 22.05 - - 3.04 7.378 22.43 10.62 - - 1.44 7.378 10.44 10.621.44 7.253 10.44 9.431.30 7.253 9.69 9.431.30 7.453 11.38 0.00 - - - 8.753 0.00 0.00 - -

0.00 0.00 - -

298.66 301.48 0.00 0.00 1.41 0.00

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.9 0 8.666 0.00 6.59 0.00 7.614 - 1.29 0.91 0.010.76 8.561 5.86 9.93 0.17 7.787 1.30 0.72 1.16 7.713 8.74 16.66 0.09 7.621 0.70 - 2.16 7.532 16.45 24.63 0.00 7.614 - - 3.27 7.614 24.34 23.53 - - 3.09 7.443 22.38 23.00 - - 3.09 7.243 22.38 21.44 - - 2.96 7.243 21.81 21.00 - - 2.90 7.368 21.37 10.02 - - 1.36 7.368 9.85 10.02 - - 1.36 7.243 9.85 8.84 - - 1.22 7.243 9.08 8.84 - - 1.22 7.443 10.57 0.00 - - - 8.666 0.00 0.00 - -

0.00 0.00 - -

182.68 184.49 2.00 2.01 0.91 0.01

(lanjutan)

AREA (m2)

Jumlah

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN AREA (m2)

Jumlah

Jumlah

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN

AREA (m2)CROSS

KOORDINAT GALIAN KOORDINAT TIMBUNAN

Page 7: Back Up Volume

Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.10 0 8.555 0.00 3.08 0.00 7.860 - 2.44 0.10 0.000.36 8.496 2.83 5.95 0.31 7.553 2.44 - 0.70 7.860 5.99 0.00 0.00 7.860 - - - 8.555 0.00 0.00 - -

0.00 0.00 - - - -

8.82 9.03 2.44 2.44

- 7.553 0.00 8.01 - - 0.83 0.001.06 7.598 8.26 17.17 - - 2.26 7.789 19.55 21.50 - - 2.76 8.652 23.84 27.69 - - 3.20 8.637 23.78 17.19 - - 1.99 7.432 14.39 14.79 - - 1.99 7.232 14.39 13.45 - - 1.86 7.232 13.68 13.45 - - 1.86 7.357 13.68 1.91 - - 0.26 7.357 1.88 1.91 - - 0.26 7.232 1.88 0.87 - - 0.12 7.232 0.89 0.87 - - 0.12 7.432 0.91 0.00 - - - 7.553 0.00 0.00 - -

0.00 0.00 - -

137.14 138.80 0.00 0.000.94 0.00

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.11 0 7.617 0.00 6.86 0.00 8.313 - 5.82 0.54 0.100.90 7.567 6.88 17.33 0.70 7.617 5.34 3.05 2.29 7.641 16.99 15.82 0.40 7.633 3.33 - 2.07 7.421 14.95 15.36 0.00 8.313 - - 2.07 7.221 14.95 13.94 - - 1.93 7.221 14.18 13.94 - - 1.93 7.346 14.18 2.42 - - 0.33 7.346 2.38 2.42 - - 0.33 7.221 2.38 1.37 - - 0.19 7.221 1.41 1.37 - - 0.19 7.421 1.45 0.00 - - - 7.617 0.00 0.00 - -

0.00 0.00 - - 89.74 90.83 8.67 8.87

0.00 0.00 0.00 7.641 0.00 6.95 0.00 0.180.00 0.00 0.91 8.554 6.97 3.510.00 0.00 0.41 7.663 3.13 0.000.00 0.00 0.00 7.641 0.00 0.00

0.00 0.00 10.11 10.460.54 0.28

(lanjutan)

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN AREA (m2)

Jumlah 01

JUMLAH (01 + 02)

AREA (m2)

Jumlah 02

Jumlah 01

JUMLAH (01 + 02)

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN

Jumlah 02

Page 8: Back Up Volume

Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.12 - 8.45 0.00 1.52 - 8.108 - 4.70 0.02 0.070.18 8.40 1.46 2.85 0.58 7.526 4.37 2.48 0.34 8.11 2.87 0.00 0.33 7.526 2.68 - - 8.45 0.00 0.00 - 8.108 - -

0.00 0.00 - - 4.33 4.38 7.04 7.19

- 7.526 0.00 15.65 - 7.641 0.00 6.95 0.37 0.182.08 7.498 15.41 14.92 0.91 8.554 6.97 3.511.99 7.411 14.35 14.75 0.41 7.663 3.13 0.001.99 7.211 14.35 13.34 - 7.641 0.00 0.001.85 7.211 13.57 13.34 - - 0.00 0.001.85 7.336 13.57 1.83 - - 0.00 0.000.25 7.336 1.80 1.83 - - 0.00 0.000.25 7.211 1.80 0.87 - - 0.00 0.000.12 7.211 0.89 0.87 - - 0.00 0.000.12 7.411 0.90 0.00 - - 0.00 0.00- 7.526 0.00 0.00 - - 0.00 0.00

0.00 0.00 - - 0.00 0.00

76.66 77.40 10.11 10.460.39 0.25

X Y XY YX X Y XY YX GALIAN TIMBUNAN

A.13 - 1.570 0.00 1.74 - 8.573 - 4.20 3.07 0.311.11 7.385 8.31 15.73 0.49 8.583 3.71 12.79 2.13 7.487 15.76 15.30 1.49 7.570 11.43 6.81 2.04 7.400 14.72 15.13 0.90 7.669 7.59 3.83 2.04 7.200 14.72 13.75 0.50 8.428 4.29 - 1.91 7.200 14.04 13.75 - 8.573 - - 1.91 7.352 13.99 2.28 - - - - 0.31 7.325 2.23 2.27 - - - - 0.31 7.200 2.23 1.22 - - - - 0.17 7.200 1.26 1.22 - - - - 0.17 7.400 1.29 0.00 - - - - - 7.570 0.00 0.00 - - - -

0.00 0.00 - - 88.55 82.40 27.01 27.64

- - - - - 7.487 0.00 7.94 0.00 2.93- - - - 1.06 8.548 9.06 10.09- - - - 1.18 8.548 8.91 5.81- - - - 0.68 7.554 0.00 0.00

- 7.487 0.00 0.00-

0.00 0.00 17.97 23.843.07 3.25

Jumlah 01

Jumlah 02

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN

(lanjutan)AREA (m2)

JUMLAH (01 + 02)

AREA (m2)

Jumlah 01

Jumlah 02JUMLAH (01 + 02)

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN

Page 9: Back Up Volume

Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara

X Y XY YX X Y XY YX GALIAN TIMBUNAN

- - 0.00 0.00 - - - - 0.00 0.00- - 0.00 0.00 - - - - - - 0.00 0.00 - - - - - - 0.00 0.00 - - - - - - 0.00 0.00 - - - - - - 0.00 0.00 - - - - - - 0.00 0.00 - - - - - - 0.00 0.00 - - - - - - 0.00 0.00 - - - - - - 0.00 0.00 - - - - - - 0.00 0.00 - - - - - - 0.00 0.00 - - - -

0.00 0.00 - - 0.00 0.00 0.00 0.00

0.00 0.00 - - 0.00 0.00 0.00 0.000.00 0.00 - - 0.00 0.000.00 0.00 - - 0.00 0.000.00 0.00 - - 0.00 0.00

0.00 0.00 0.00 0.000.00 0.00

AREA (m2)(lanjutan)

Jumlah 01

Jumlah 02JUMLAH (01 + 02)

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN

Page 10: Back Up Volume

PERBAIKAN DAN PEMBANGUNAN

JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR

SALURAN SEKUNDER BS.3 – BS.4 KECAMATAN PAYA BAKONG – KABUPATEN ACEH UTARA

PERHITUNGAN VOLUME PEKERJAAN BETON

TAHUN ANGGARAN 2007

Konsultan Perencana CV. TOTAL ENGINEERING CONSULTANT

Jln. Kenari No. 9B – Telp./Fax. 0645 – 41538 LHOKSEUMAWE - 24312

Page 11: Back Up Volume

PERBAIKAN DAN PEMBANGUNANJARINGAN IRIGASI DAN PENANGGULANGAN BANJIR

SALURAN SEKUNDER RUAS BS.3 - BS.4KECAMATAN PAYA BAKONG - KABUPATEN ACEH UTARA

BACK UP DATA

II.3 Beton Bertulang K.175 Linning Saluran (dasar gambar) = 778,20 M

2 { x 0,10 x 778,20 } = 31.91 M3

2 { x 0,10 x778,20 } = 77.82 M3

109.73 M3

II.4 Beton Cor 1 : 3 : 5 Lantai Saluran

Panjang Saluran = 778,20 - ( 196 x 0,14 ) ~> Balok Diafragma Setiap 4 m

= 750.76 m

Volume = 0,15 x 1,60 x 750,76

= 180.18 m3

II.5 Beton Bertulang K.175 diafragma / setiap 4 meter = 14/28

Jumlah Balok Diafragma = + 1 = 196 Buah

Volume = { 0,14 x 0,28 x 1,60 } x 196

= 12.29 m3

Beton Bertulang K.175 Balok 14/28 Pada Kaki Linning

( 0,14x0,28x778,20 ) x2 = 61.01 m3

Total Volume = 12,29 m3 + 61,01 m3

= 73.30 m3

0,20 + 0,21 2

0,92 + 1,05 2

778,20 m 4 m

Page 12: Back Up Volume